Sample records for development project cxs

  1. Geothermal Development and the Use of Categorical Exclusions (Poster)

    SciTech Connect (OSTI)

    Levine, A.; Young, K. R.

    2014-09-01T23:59:59.000Z

    The federal environmental review process under the National Environmental Policy Act of 1969 (NEPA) can be complex and time consuming. Currently, a geothermal developer may have to complete the NEPA process multiple times during the development of a geothermal project. One mechanism to reduce the timeframe of the federal environmental review process for activities that do not have a significant environmental impact is the use of Categorical Exclusions (CXs), which can exempt projects from having to complete an Environmental Assessment or Environmental Impact Statement. This study focuses primarily on the CX process and its applicability to geothermal exploration. In this paper, we Provide generalized background information on CXs, including previous NEPA reports addressing CXs, the process for developing CXs, and the role of extraordinary circumstances; Examine the history of the Bureau of Land Management's (BLM) geothermal CXs;Compare current CXs for oil, gas, and geothermal energy; Describe bills proposing new statutory CXs; Examine the possibility of standardizing geothermal CXs across federal agencies; and Present analysis from the Geothermal NEPA Database and other sources on the potential for new geothermal exploration CXs. As part of this study, we reviewed Environmental Assessments (EAs) conducted in response to 20 geothermal exploration drilling permit applications (Geothermal Drilling Permits or Notices of Intents) since the year 2001, the majority of which are from the last 5 years. All 20 EAs reviewed for this study resulted in a Finding of No Significant Impact (FONSI). While many of these FONSI's involved proponent proposed or federal agency required mitigation, this still suggests it may be appropriate to create or expand an exploration drilling CX for geothermal, which would have a significant impact on reducing geothermal exploration timelines and up-front costs. Ultimately, federal agencies tasked with permitting and completing environmental reviews for geothermal exploration drilling activities and/or legislative representatives are the responsible parties to discuss the merits and implementation of new or revised CXs for geothermal development.

  2. Economic Development Project Districts (Indiana)

    Broader source: Energy.gov [DOE]

    Redevelopment commissions may petition legislative bodies to designate economic development project districts in cities with populations between 80,500 and 500,000. Such districts may be...

  3. Geothermal Development and the Use of Categorical Exclusions Under the National Environmental Policy Act of 1969 (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K. R.

    2014-09-01T23:59:59.000Z

    The federal environmental review process under the National Environmental Policy Act of 1969 (NEPA) can be complex and time consuming. Currently, a geothermal developer may have to complete the NEPA process multiple times during the development of a geothermal project. One mechanism to reduce the timeframe of the federal environmental review process for activities that do not have a significant environmental impact is the use of Categorical Exclusions (CXs), which can exempt projects from having to complete an Environmental Assessment or Environmental Impact Statement. This study focuses primarily on the CX process and its applicability to geothermal exploration. In this paper, we: Provide generalized background information on CXs, including previous NEPA reports addressing CXs, the process for developing CXs, and the role of extraordinary circumstances; Examine the history of the Bureau of Land Management's (BLM) geothermal CXs; Compare current CXs for oil, gas, and geothermal energy; Describe bills proposing new statutory CXs; Examine the possibility of standardizing geothermal CXs across federal agencies; and Present analysis from the Geothermal NEPA Database and other sources on the potential for new geothermal exploration CXs. As part of this study, we reviewed Environmental Assessments (EAs) conducted in response to 20 geothermal exploration drilling permit applications (Geothermal Drilling Permits or Notices of Intents) since the year 2001, the majority of which are from the last 5 years. All 20 EAs reviewed for this study resulted in a Finding of No Significant Impact (FONSI). While many of these FONS's involved proponent proposed or federal agency required mitigation, this still suggests it may be appropriate to create or expand an exploration drilling CX for geothermal, which would have a significant impact on reducing geothermal exploration timelines and up-front costs. Ultimately, federal agencies tasked with permitting and completing environmental reviews for geothermal exploration drilling activities and/or legislative representatives are the responsible parties to discuss the merits and implementation of new or revised CXs for geothermal development.

  4. Grid Connectivity Research, Development & Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connectivity Research, Development & Demonstration Projects Grid Connectivity Research, Development & Demonstration Projects 2013 DOE Hydrogen and Fuel Cells Program and Vehicle...

  5. Developing Government Renewable Energy Projects

    SciTech Connect (OSTI)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01T23:59:59.000Z

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  6. Developments in Digital Cinema Projection

    E-Print Network [OSTI]

    Zanibbi, Richard

    Developments in Digital Cinema Projection Barry Silverstein Projection Technology Manager Entertainment Imaging, Eastman Kodak 4pm, Wed., Nov. 1, 2006 Auditorium of the Center for Imaging Science George and color, the switch to Digital Technology. The Digital Cinema conversion process is just beginning. It has

  7. Tribal Renewable Energy Advanced Course: Project Development...

    Broader source: Energy.gov (indexed) [DOE]

    slides. This course provides in-depth information on project development concepts for renewable energy projects on tribal lands, including: Risk and uncertainty Tribal project...

  8. Hualapai Tribal Utility Development Project

    SciTech Connect (OSTI)

    Hualapai Tribal Nation

    2008-05-25T23:59:59.000Z

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

  9. Project Development and Finance: Capabilities (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-01-01T23:59:59.000Z

    Capabilities overview of NREL's Project Finance and Development Group within the Deployment and Market Transformation Directorate.

  10. Renewable Energy Project Development: Advanced Process Topics

    Broader source: Energy.gov (indexed) [DOE]

    About the DOE Office of Indian Energy Education Initiative Processes for Developing Renewable Energy Projects on Tribal Lands - Understanding the Energy Market and Project...

  11. Tribal Renewable Energy Advanced Course: Project Development...

    Broader source: Energy.gov (indexed) [DOE]

    slides. This course provides in-depth information on project development processes for renewable energy projects on tribal lands, including: Understanding the energy market and...

  12. Hipikat: A Project Memory for Software Development

    E-Print Network [OSTI]

    van der Hoek, André

    Hipikat: A Project Memory for Software Development Davor CCubranicc, Gail C. Murphy, Member, IEEE's usefulness in software modification tasks. One study evaluated the usefulness of Hipikat's recommendations Terms--Software development teams, project memory, software artifacts, recommender system, user studies

  13. START Renewable Energy Project Development Assistance | Department...

    Energy Savers [EERE]

    START Renewable Energy Project Development Assistance START Renewable Energy Project Development Assistance May 1, 2015 11:59PM EDT U.S. Department of Energy The U.S. Department of...

  14. Tribal Energy Project Development Through ESCOs

    Broader source: Energy.gov [DOE]

    Download presentation slides below for the Tribal Energy Project Development through Energy Service Companies (ESCOs) webinar on April 21, 2010.

  15. ESPC Project Developer's Resource Guide

    Energy Savers [EERE]

    in the charts, and are identified alongside additional detail in Section 4. 4 *Items in blue are project deliverables. 5 *Items in blue are project deliverables. 6 *Items in blue...

  16. START Renewable Energy Project Development Assistance

    Broader source: Energy.gov [DOE]

    The DOE Office of Indian Energy is now accepting applications for the third round of the Strategic Technical Assistance Response Team (START) Renewable Energy Project Development Assistance Program to provide Tribes with technical assistance with furthering the development of community- and commercial-scale renewable energy projects. Applications are due May 1, 2015, and up to five projects will be selected in June 2015.

  17. Renewable Energy Project Development: Advanced Concept Topics

    Broader source: Energy.gov (indexed) [DOE]

    Concept Topics An Introduction to Risk, Tribal Roles, and Support Policies in the Renewable Energy Project Development Process Course Outline What we will cover... About the...

  18. Tribal Renewable Energy Advanced Course: Project Development...

    Broader source: Energy.gov (indexed) [DOE]

    advanced course webinar entitled "Tribal Renewable Energy Project Development and Financing Essentials" by clicking on the .swf link below. You can also download the presentation...

  19. Transmission-Planning Research & Development Scoping Project

    E-Print Network [OSTI]

    -99-013 Prepared For: Linda Kelly, Project Manager Energy Systems Integration Program Laurie ten Hope, PIER ProgramTransmission-Planning Research & Development Scoping Project CALIFORNIA ENERGY COMMISSION, California Institute for Energy and the Environment under Contract No. 500-99-013 and by the U.S. Department

  20. NREL: Technology Deployment - Project Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: Grid Integration NRELCostBuildingModels and ToolsOtherDevelopment

  1. Photovoltaic concentrator technology development project. Sixth project integration meeting

    SciTech Connect (OSTI)

    None

    1980-10-01T23:59:59.000Z

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  2. 2015 Alaska Project Development and Finance Workshop Agenda and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Development and Finance Workshop Agenda and Presentations 2015 Alaska Project Development and Finance Workshop Agenda and Presentations The DOE Office of Indian Energy...

  3. 2015 RENEWABLE ENERGY PROJECT DEVELOPMENT AND FINANCE WORKSHOP

    Office of Environmental Management (EM)

    for and potential pitfalls of developing and financing community and facility scale renewable energy projects 2) Determine how the development of a renewable energy project could...

  4. DOE Alaska Native Village Renewable Energy Project Development...

    Energy Savers [EERE]

    Alaska Native Village Renewable Energy Project Development Workshop DOE Alaska Native Village Renewable Energy Project Development Workshop March 30, 2015 9:00AM AKDT to April 1,...

  5. DOE and USCAR Announce $70 Million Project to Accelerate Development...

    Energy Savers [EERE]

    Announce 70 Million Project to Accelerate Development of Lightweight, High-Strength Materials DOE and USCAR Announce 70 Million Project to Accelerate Development of Lightweight,...

  6. Alaska Native Village Renewable Energy Project Development Workshop...

    Office of Environmental Management (EM)

    Alaska Native Village Renewable Energy Project Development Workshop in Juneau Alaska Native Village Renewable Energy Project Development Workshop in Juneau March 30, 2015 8:00AM...

  7. Alaska Native Village Renewable Energy Project Development Workshop...

    Office of Environmental Management (EM)

    Alaska Native Village Renewable Energy Project Development Workshop in Dillingham Alaska Native Village Renewable Energy Project Development Workshop in Dillingham March 26, 2015...

  8. START Program for Renewable Energy Project Development Assistance...

    Broader source: Energy.gov (indexed) [DOE]

    Program for Renewable Energy Project Development Assistance START Program for Renewable Energy Project Development Assistance The Strategic Technical Assistance Response Team...

  9. START Program for Renewable Energy Project Development Assistance...

    Energy Savers [EERE]

    Program for Renewable Energy Project Development Assistance - Round Three Application START Program for Renewable Energy Project Development Assistance - Round Three Application...

  10. START Program for Renewable Energy Project Development Assistance...

    Office of Environmental Management (EM)

    Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement START Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement...

  11. CHP Project Development Handbook (U.S. Environmental Protection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Development Handbook (U.S. Environmental Protection Agency CHP Partnership) CHP Project Development Handbook (U.S. Environmental Protection Agency CHP Partnership) The...

  12. Commercial-Scale Renewable Energy Project Development Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colorado Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop: Colorado Community-Scale Project Development and Finance Workshop: Oklahoma...

  13. Community-Scale Project Development and Finance Workshop Agenda...

    Energy Savers [EERE]

    Community-Scale Project Development and Finance Workshop Agenda and Presentations: Oklahoma Community-Scale Project Development and Finance Workshop Agenda and Presentations:...

  14. DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development...

    Energy Savers [EERE]

    DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone DOE-Sponsored Syngas Cleanup Demonstration Project Reaches Development Milestone February 19, 2015...

  15. ISO launches a project committee to develop an International...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    launches a project committee to develop an International Standard for energy management ISO launches a project committee to develop an International Standard for energy management...

  16. Development of Direct-Use Projects: Preprint

    SciTech Connect (OSTI)

    Lund, J.

    2011-01-01T23:59:59.000Z

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  17. Renewable Energy Project Development Assistance (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-07-01T23:59:59.000Z

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  18. Fast Charging Electric Vehicle Research & Development Project

    SciTech Connect (OSTI)

    Heny, Michael

    2014-03-31T23:59:59.000Z

    The research and development project supported the engineering, design and implementation of onroad Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: ? Short Commute: Defined as EVs performing in limited duration, routine commutes. ? Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. ? Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehiclerelated greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

  19. Session: Pre-development project risk assessment

    SciTech Connect (OSTI)

    Curry, Richard; Linehan, Andy

    2004-09-01T23:59:59.000Z

    This second session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The focus of the presentations was on the practices and methodologies used in the wind energy industry for assessing risk to birds and bats at candidate project sites. Presenters offered examples of pre-development siting evaluation requirements set by certain states. Presentation one was titled ''Practices and Methodologies and Initial Screening Tools'' by Richard Curry of Curry and Kerlinger, LLC. Presentation two was titled ''State of the Industry in the Pacific Northwest'' by Andy Linehan, CH2MHILL.

  20. Renewable Energy Project Development and Financing: Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    Most costly for Tribedeveloper to acquire long-term ownership of project (large cash infusion year 7) * Tribedeveloper operates the project * Requires largest equity...

  1. Commercial-Scale Renewable Energy Project Development and Finance...

    Broader source: Energy.gov (indexed) [DOE]

    Commercial-Scale Renewable Energy Project Development and Finance Workshop Commercial-Scale Renewable Energy Project Development and Finance Workshop July 29, 2014 1:00PM MDT to...

  2. Community-Scale Project Development and Finance Workshop: Oklahoma...

    Office of Environmental Management (EM)

    Scale Project Development and Finance Workshop: Oklahoma Community-Scale Project Development and Finance Workshop: Oklahoma June 9, 2015 - 10:19am Addthis June 9-11, 2015 Norman,...

  3. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09T23:59:59.000Z

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  4. Project Profile: Development and Performance Evaluation of High...

    Energy Savers [EERE]

    Development and Performance Evaluation of High Temperature Concrete for Thermal Energy Storage for Solar Power Generation Project Profile: Development and Performance Evaluation of...

  5. Small Hydropower Research and Development Technology Project

    SciTech Connect (OSTI)

    Blackmore, Mo [Near Space Systems, Inc.] [Near Space Systems, Inc.

    2013-12-06T23:59:59.000Z

    The objective of this work was to investigate, develop, and validate the next generation of small hydroturbine generator designs that maximize the energy transfer from flowing water to electrical power generation. What resulted from this effort was the design of a new technology hydroturbine that Near Space Systems (NSS) has named the Star*Stream© Hydroturbine. Using a design that eliminates nearly all of the shortfalls of conventional hydroturbines, the Star*Stream© Hydroturbine employs a new mechanical-to-electrical energy transfer hydro design that operates without lubrication of any kind, and does not introduce foreign chemicals or particulate matter from oil or drive shaft seal degradation into the hydro ecology. In its unique configuration, the Star*Stream© Hydroturbine is nearly environmentally inert, without the negative aspects caused by interrupting the ecological continuity, i.e., disruptions to sedimentation, water quality, habitat changes, human displacement, fish migration, etc., - while it ensures dramatically reduced timeframes to project completion. While a remarkable reduction in LCOE resulting from application of the Star*Stream© Hydroturbine technology has been the core achievement of the this effort, there have been numerous technological breakthroughs from the development effort.

  6. Projecting human development and CO2 emissions

    E-Print Network [OSTI]

    Costa, Luís; Kropp, Jürgen P

    2012-01-01T23:59:59.000Z

    We estimate cumulative CO2 emissions during the period 2000 to 2050 from developed and developing countries based on the empirical relationship between CO2 per capita emissions (due to fossil fuel combustion and cement production) and corresponding HDI. In order to project per capita emissions of individual countries we make three assumptions which are detailed below. First, we use logistic regressions to fit and extrapolate the HDI on a country level as a function of time. This is mainly motivated by the fact that the HDI is bounded between 0 and 1 and that it decelerates as it approaches 1. Second, we employ for individual countries the correlations between CO2 per capita emissions and HDI in order to extrapolate their emissions. This is an ergodic assumption. Third, we let countries with incomplete data records evolve similarly as their close neighbors (in the emissions-HDI plane, see Fig. 1 in the main text) with complete time series of CO2 per capita emissions and HDI. Country-based emissions estimates a...

  7. Renewable Energy Project Development and Finance: Advanced Development...

    Broader source: Energy.gov (indexed) [DOE]

    Most costly for Tribedeveloper to acquire long-term ownership of project (large cash infusion year 10) * Tribedeveloper operates the project * Requires largest equity...

  8. Innovation Project Development Jan 2013 1 Attributes of an Innovation Project

    E-Print Network [OSTI]

    Bertini, Robert L.

    Innovation Project Development Jan 2013 1 Attributes of an Innovation Project Good projects the idea to act on the problem or opportunity To achieve the goals of the project, the team must, computers, materials and instrumentation. The cash award from the Innovation Council is most often used

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT SMUD OFFPEAK OVERCOOLING PROJECT DECEMBER 2007 CEC5002013066 Prepared for: California Energy Commission Prepared by: Davis Energy Group #12; PREPARED BY: Primary Author(s): David Springer Davis Energy Group Davis, CA

  10. Renewable Energy Project Development and Financing: Community...

    Broader source: Energy.gov (indexed) [DOE]

    Community Course Outline What we will cover... About the DOE Office of Indian Energy Education Initiative Community-Scale Process: Hypothetical Example - Project...

  11. Business Continuity Project Project Summary: Develop Business Continuity Plans for all critical functional areas of

    E-Print Network [OSTI]

    and methods to "invoke" individual plans, · Identify critical materials, parts, equipment needed, · Identify resources for obtaining critical materials, parts, equipment, · Identify resources for critical servicesBusiness Continuity Project Project Summary: Develop Business Continuity Plans for all critical

  12. Position Description Project Manager, Office of Community and Economic Development

    E-Print Network [OSTI]

    Position Description Project Manager, Office of Community and Economic Development Full will support all aspects of the success of CSU's Office of Community and Economic Development projects from to the Director and Assistant Director of the Community and Economic Development Office of Colorado State

  13. Framework for Project Development in the Renewable Energy Sector

    SciTech Connect (OSTI)

    Springer, R.

    2013-02-01T23:59:59.000Z

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  14. Developing Renewable Energy Projects Larger Than 10 MWs at Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Guide helps agency personnel navigate the complexities of developing large-scale renewable energy projects and assists them in attracting the necessary private capital to complete...

  15. EA-1746: Blue Mountain Geothermal Development Project, Humboldt...

    Broader source: Energy.gov (indexed) [DOE]

    December 3, 2007 EA-1746: Final Environmental Assessment Blue Mountain Geothermal Development Project April 26, 2010 EA-1746: Finding of No Significant Impact Blue Mountain...

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    supplies, dry cooling systi Energy Research and Development Division FINAL PROJECT REPORT INLET AIR SPRAY COOLINGUse Energy Efficiency · Renewable Energy Technologies · Transportation Inlet Air Spray Cooling

  17. 2015 Project Development and Finance Workshop Agenda and Presentations

    Broader source: Energy.gov [DOE]

    The Office of Indian Energy hosted three back-to-back Alaska Renewable Energy Project Development and Finance Workshops in Alaska.

  18. 2014 Commercial-Scale Renewable Energy Project Development and...

    Broader source: Energy.gov (indexed) [DOE]

    Commercial-Scale Tribal Renewable Energy Project Development and Finance workshop held July 29-31, 2014, at the National Renewable Energy Laboratory in Golden, Colorado. Agenda...

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BIOENERGETICS, SPACIAL · Transportation Integrating Bioenergetics, Spatial Scales, and Population Dynamics for Environmental Flow

  20. The Coso EGS Project, recent developments (in International collaborat...

    Open Energy Info (EERE)

    in the Americas) Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Proceedings: The Coso EGS Project, recent developments (in International...

  1. Evaluating the Impact of Development Projects on Poverty: A Handbook...

    Open Energy Info (EERE)

    Evaluating the Impact of Development Projects on Poverty: A Handbook for Practitioners Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Evaluating the Impact of...

  2. Alaska Facility- and Community-Scale Project Development Regional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska. Photo by Sherry Stout, NREL. Alaska Energy Workshop Tour Creates Rich Opportunities for Knowledge Sharing Community-Scale Project Development and Finance Workshop: Oklahoma...

  3. Community- and Facility-Scale Renewable Energy Project Development...

    Energy Savers [EERE]

    energy.govindianenergy Community- and Facility-Scale Renewable Energy Project Development and Finance Workshop June 9-11, 2015 Riverwind Hotel and Casino Norman, Oklahoma DRAFT...

  4. Project Profile: Development and Productization of High-Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low-Cost Building-Integrated PV Shingles Using Monocrystalline Silicon Thin-Film Solar Cells Project Profile: Development and Productization of High-Efficiency, Low-Cost...

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT SMART GRID ROADMAP and Development Division funding efforts are focused on the following RD&D program areas: · Buildings EndUse Energy Efficiency · Renewable Energy Technologies · Transportation The Smart Grid Roadmap

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Modeling, Landscape Genetics, and Habitat Connectivity for the Mohave Ground Squirrel to Guide Renewable Energy Research and Development Division FINAL PROJECT REPORT Habitat Energy Development JANUARY 2013 CEC5002014003 Prepared for: California Energy Commission Prepared

  7. The use of process metrics to evaluate product development projects

    E-Print Network [OSTI]

    Kellam, Benjamin A. (Benjamin Alexander), 1972-

    2004-01-01T23:59:59.000Z

    Product development success is an important strategic factor in today's business environment. The ability to accurately predict the outcome of product development projects would be a useful strategic tool. This research ...

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Developing5002013109 Prepared for: California Energy Commission Prepared by: Growpro Inc #12; Prepared by Waimauku, New Zealand Contract Number: PIR-07-001 Prepared for: California Energy Commission Abolghasem

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary-09-010 Prepared for: California Energy Commission Matthew Fung Contract Manager Virginia Lew Office Manager Energy

  10. Environmental impact assessment of the Dulang oilfield development project

    SciTech Connect (OSTI)

    Hasan, M.N. (U. Kebangsaan Malaysia (MY)); (Ismail, M.Y. (Petronas Cangali Sdn. Bhd. (MY)))

    1988-01-01T23:59:59.000Z

    The authors discuss an environmental impact assessment (EIA) of the Dulang Oilfield Development Project, conducted to determine whether the project could proceed in a safe and environmentally acceptable manner. This is the first EIA for an offshore oilfield in Malaysian waters, and was conducted in anticipation of the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment Order(1987)) which requires an EIA to be conducted for major oil and gas field development projects.

  11. Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid

    E-Print Network [OSTI]

    California at Davis, University of

    Project Information Form Project Title Advanced Energy Management Strategy Development for Plug management strategy, which determines how energy flows in a hybrid powertrain should be managed in response for PHEVs using connected vehicle technology. Different energy management strategies will be developed

  12. Project progress report: Development of an Engineering for Sustainable Development MPhil

    E-Print Network [OSTI]

    2009-07-13T23:59:59.000Z

    FP9 Six month progress report Project Reference#7;#7;#7;Project Title#7;Joint Curriculum Development Effort: Development of an Engineering for Sustainable Development M.Phil for Cambridge University#7;#7;Project Leader (CU): Dr R... detail any information regarding the Project that was not included in your final application to CMI, or changes that have been made since. For example, the objectives, schedule, intended beneficiaries, collaborators and virement between headings. Please...

  13. Project Development Resources | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar for FederalProgramLogisticalProject

  14. Cambridge Project Development | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LPInformation 8thCalwind II CEC Wind FarmCambria,Project

  15. Magnesium Research and Technology Development: Project 48976

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advise DOE on criticalkey funding areas for Mg 3 z z Approach Approach Approach Increase automotive industry awareness in the use of Mg Develop and maintain the Magnesium R&D...

  16. Oklahoma Renewable Energy Project Development and Finance Workshop

    Office of Environmental Management (EM)

    Oklahoma Renewable Energy Project Development and Finance Workshop AGENDA June 9-11, 2015 Riverwind Hotel and Casino 1544 State Highway 9 Norman, OK 73072 405-322-6000 Learning...

  17. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT SAIC SOLAR DISHUse Energy Efficiency · Energy Innovations Small Grants · EnergyRelated Environmental Research · EnergyUse Energy Efficiency · Renewable Energy Technologies · Transportation Solar Dish Concentrator

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT HYBRID SOLAR LIGHTINGUse Energy Efficiency · Energy Innovations Small Grants · EnergyRelated Environmental Research · EnergyUse Energy Efficiency · Renewable Energy Technologies · Transportation Hybrid Solar Lighting

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Commission Marla Mueller Contract Manager Guido Franco Program Area Lead Energy-Related Environmental Energy Research and Development Division FINAL PROJECT REPORT A SEASONAL DECEMBER 2011 CEC5002013035 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    CEC5002013042 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National · EnergyRelated Environmental Research · Energy Systems Integration · Environmentally Preferred Advanced. The information from this project contributes to Energy Research and Development Division's Buildings End

  1. TRANSPORTATION NODES, REAL ESTATE AND URBAN DEVELOPMENT The Metamorphosis Project

    E-Print Network [OSTI]

    Malinnikova, Eugenia

    1 TRANSPORTATION NODES, REAL ESTATE AND URBAN DEVELOPMENT The Metamorphosis Project Norwegian ON SPEEDBOATS, ALONG THE LEBANESE COAST. THEN EACH PORT OF CALL WOULD BECOME A TRANSPORTATION HUB · 4 ­ 5

  2. Commercial-Scale Renewable Energy Project Development and Finance...

    Office of Environmental Management (EM)

    and Finance Workshop: Colorado Commercial-Scale Renewable Energy Project Development and Finance Workshop: Colorado July 9, 2013 - 5:27pm Addthis July 9-11, 2013 Golden, Colorado...

  3. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT EMISSIONS REDUCTIONS FROM RENEWABLE ENERGY AND ENERGY EFFICIENCY IN CALIFORNIA AIR QUALITY MANAGEMENT DISTRICTS DECEMBER 2011 CEC5002013047 Prepared for: California Energy Commission Prepared by: Synapse Energy

  4. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT PLANNING ALTERNATIVE5002013021 Prepared for: California Energy Commission Prepared by: Facet Decision Systems, Inc. #12-08-030 Prepared for: California Energy Commission Linda Spiegel Contract Manager Linda Spiegel Office Manager

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ASSESSMENT OF PIEZOELECTRIC MATERIALS FOR ROADWAY ENERGY HARVESTING Cost of Energy and Demonstration Roadmap Prepared for: California Energy Commission Prepared by: DNV KEMA Energy & Sustainability JANUARY 2014 CEC5002013007

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT PRELIMINARY ESTIMATES5002013051 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory: 500-99-013 Prepared for: California Energy Commission Steve Ghadiri Contract Manager Fernando Pińa

  7. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12: California Energy Commission Raquel Kravitz Program Manager Fernando Pina Office Manager Energy Systems

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Demonstration: California Energy Commission Prepared by: Electric Power Research Institute #12; Prepared by: Primary: California Energy Commission Jamie Patterson Contract Manager Fernando Pina Office Manager Energy Efficiency

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT GREENGUIDE FOR SUSTAINABLE ENERGY EFFICIENT REFRIGERATED STORAGE FACILITIES MARCH 2013 CEC-500-2013-145 Prepared for: California Energy for: California Energy Commission Anish Gautam Contract Manager Virginia Lew Office Manager Energy

  10. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12 Energy Commission Raquel E. Kravitz Program Manager Fernando Pina Office Manager Energy Systems Research

  11. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT LIGHTING CALIFORNIA'S FUTURE RetrofitIntegrated Classroom Lighting System (RICLS) Prepared for: California Energy Commission Managed by: Architectural Energy Corporation Prepared by: Finelite Inc. FEBRUARY 2013 CEC

  12. Alaska Native Village Renewable Energy Project Development Workshop...

    Energy Savers [EERE]

    Bethel Alaska Native Village Renewable Energy Project Development Workshop in Bethel March 23, 2015 8:00AM AKDT to March 25, 2015 5:00PM AKDT Bethel, Alaska University of Alaska...

  13. Microsoft Word - START Renewable Energy Project Development Assistance...

    Energy Savers [EERE]

    part of the DOE Office of Indian Energy's effort to assist in the development of tribal renewable energy projects. The START team is comprised of DOE and national laboratory...

  14. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    or pricing event. The California Energy Commission is considering standards that would include a requirement Energy Research and Development Division FINAL PROJECT REPORT Technology MARCH 2013 CEC5002012077 Prepared for: California Energy Commission Prepared by: Heschong Mahone

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    ENERGY BALANCE UPDATE AND DECOMPOSITION ANALYSIS FOR THE INDUSTRY AND BUILDING SECTORS APRIL 2013 · Transportation California Energy Balance Update and Decomposition Analysis for the Industry and Building Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ASSESSMENT OF LARVAL Coastal Boundary Layer Flow SEPTEMBER 2007 CEC5002013049 Prepared for: California Energy Commission Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy Generation Research

  17. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect (OSTI)

    Thomas Benally, Deputy Director,

    2012-05-15T23:59:59.000Z

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary.lbl.gov Contract Number: 500-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT HIGHTECH BUILDINGS DECEMBER 2008 CEC5002013062 Prepared for: California Energy Commission Prepared by-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager Virginia Lew Office Manager

  20. Energy Research and Development Division DRAFT PROJECT REPORT

    E-Print Network [OSTI]

    Use Energy Efficiency · Renewable Energy Technologies · Transportation Natural Gas Energy Efficiency Energy Research and Development Division DRAFT PROJECT REPORT NATURAL GAS ENERGY EFFICIENCY in Buildings ­ Roadmap for Future Research is the final report for the Buildings Natural Gas Roadmap

  1. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    efforts are focused on securing stable and economical storage, transportation, and delivery of natural gas-Use Energy Efficiency · Renewable Energy Technologies · Transportation California Natural Gas StorageEnergy Research and Development Division FINAL PROJECT REPORT CALIFORNIA NATURAL GAS STORAGE

  2. Aquantis Ocean Current Turbine Development Project Report

    SciTech Connect (OSTI)

    Fleming, Alex J.

    2014-08-23T23:59:59.000Z

    The Aquantis® Current Plane (“C-Plane”) technology developed by Dehlsen Associates, LLC (DA) and Aquantis, Inc. is an ocean current turbine designed to extract kinetic energy from ocean currents. The technology is capable of achieving competitively priced base-load, continuous, and reliable power generation from a source of renewable energy not before possible in this scale or form.

  3. Federal ESPC Process Phase 3: Project Development

    Broader source: Energy.gov [DOE]

    During phase 3 of the energy savings performance contract (ESPC) procurement process, the agency and energy service company (ESCO) work to develop and award a task order. The task order includes descriptions of the energy conservation measures (ECMs); baselines; and financial schedules showing estimated savings, guaranteed savings, itemized prices, and agency payments.

  4. CXD 4604, Development CONOPS Improvement Project (4604)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o . C l a r8.0 -CURRICULUM VITAEAllenDevelopment

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF NEW TESTING PROTOCOLS FOR MEASURING THE PERFORMANCE OF SHOWERHEADS MARCH 2010 CEC-500-2013-130 Prepared for: California Energy: California Energy Commission Brad Meister Contract Manager Virginia Lew Office Manager Energy Efficiency

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF STEAM for: California Energy Commission Prepared by: University of California #12; PREPARED BY: Primary-781-5791 951-781-5790 (fax) Contract Number: 500-09-008 Prepared for: California Energy Commission David

  7. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26T23:59:59.000Z

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  8. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    SciTech Connect (OSTI)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04T23:59:59.000Z

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. Currently, State of Alaska agencies use multiple, independent systems to identify, authenticate, and authorize customers for online transactions. Consumers of online state services may be required to manage multiple online ''profiles,'' and during a permit review process valuable time may be lost verifying identity or reconciling differences in applicant information when agency records disagree. The state's Information Technology Group is developing a shared applicant profile system that will provide an additional opportunity to demonstrate data sharing between agencies.

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT SMART GRID INFORMATION ASSURANCE report, Smart Grid Information Assurance and Security Technology Assessment was prepared on the following RD&D program areas: · Buildings EndUse Energy Efficiency · Energy Innovations Small Grants

  10. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Integrated CHP Company, California Air Resource Board, U.S. Department of Energy, Integrated CHP Systems Corporation Integrated CHP Using UltraLow NOx Supplemental Firing is the final report for the Integrated CHP Using Ultra

  11. Alaska Native Village Renewable Energy Project Development Workshop in Dillingham

    Broader source: Energy.gov [DOE]

    Presented by the DOE Office of Indian Energy with support from DOE’s National Renewable Energy Laboratory, this interactive workshop will walk participants through the process of developing renewable energy and energy efficiency projects in rural Alaska and highlight the potential opportunities and challenges involved.

  12. Alaska Native Village Renewable Energy Project Development Workshop in Bethel

    Broader source: Energy.gov [DOE]

    Presented by the DOE Office of Indian Energy with support from DOE’s National Renewable Energy Laboratory, this interactive workshop will walk participants through the process of developing renewable energy and energy efficiency projects in rural Alaska and highlight the potential opportunities and challenges involved.

  13. Alaska Native Village Renewable Energy Project Development Workshop in Juneau

    Broader source: Energy.gov [DOE]

    Presented by the DOE Office of Indian Energy with support from DOE’s National Renewable Energy Laboratory, this interactive workshop will walk participants through the process of developing renewable energy and energy efficiency projects in rural Alaska and highlight the potential opportunities and challenges involved.

  14. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    the aircraft off the ground for each mission. i #12;PREFACE The California Energy Commission Energy Research/Agricultural/Water End-Use Energy Efficiency · Renewable Energy Technologies · Transportation California AutonomousEnergy Research and Development Division FINAL PROJECT REPORT CALIFORNIA AUTONOMOUS UNMANNED AERIAL

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT RWE SCHOTT SOLAR Energy Commission Prepared by: RWE Schott Solar, Inc #12; PREPARED BY: Primary Author(s): Miles C on the following RD&D program areas: · Buildings EndUse Energy Efficiency · Energy Innovations Small Grants

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Franco Program Area Lead Energy-Related Environmental Research Linda Spiegel Office Manager Energy on the following RD&D program areas: · Buildings EndUse Energy Efficiency · Energy Innovations Small Grants Energy Research and Development Division FINAL PROJECT REPORT AIRQUALITY IMPACTS OF HEAT

  17. Global Software Development at Siemens: Experience from Nine Projects

    E-Print Network [OSTI]

    Herbsleb, James D.

    Global Software Development at Siemens: Experience from Nine Projects James D. Herbsleb Carnegie@cs.cmu.edu Daniel J. Paulish, Matthew Bass Siemens Corporate Research 755 College Road East Princeton, NJ, USA 08540 +1 609 734 6500 daniel.paulish,Matthew.Bass@siemens.com ABSTRACT We report on the experiences

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    directly from the sun because harvesting solar energy using photovoltaic technologiesEnergy Research and Development Division FINAL PROJECT REPORT REPORT ON ROUTE TO SCALEUP OF POLYMER Energy Commission Prepared by: California Solar Energy Collaborative(CSEC) University of California Davis

  19. Study in South Africa and Lesotho A Curriculum Development Project

    E-Print Network [OSTI]

    Viola, Ronald

    Teachers Study in South Africa and Lesotho A Curriculum Development Project Integrating Visual Arts about the cultures and history of the Basotho people of southern Africa Participate in seminars-Hays award, graduate credit and/or CEUs Visit non-malarial and low risk areas in southern Africa and enjoy

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT RANKING AND PRIORITIZING THE DEPLOYMENT OF COMMUNITY- SCALE ENERGY MEASURES BASED ON THEIR INDIRECT EFFECTS IN CALIFORNIA'S CLIMATE ZONES MARCH 2013 CEC-500-2013-122 ALTOSTRATUS Prepared for: California Energy Commission Prepared by

  1. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT POTENTIAL TARGETS AND BENEFITS FOR URBAN ENERGY SYSTEMS RESEARCH MAY 2009 CEC-500-2010-009 Prepared for: California Energy Commission Institute of the Environment Los Angeles, CA Contract Number: BOA-99-207-P Prepared for: California Energy

  2. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ADVANCED POWER ELECTRONICS INTERFACE-2014-006 Prepared for: California Energy Commission Prepared by: National Renewable Energy Laboratory #12;PREPARED Harrison National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 Contract Number

  3. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY REDUCTION IN MEMBRANE-2013-132 Prepared for: California Energy Commission Prepared by: University of California, Irvine and Kennedy Main Street, Suite 140 Irvine, CA 92614 Contract Number: MRA-02-082 Prepared for: California Energy

  4. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT LOW­COST, ENERGY­SAVING, SOLID STATE SMART WINDOWS AUGUST 2012 CEC5002013026 Prepared for: California Energy Commission Number: PIR-10-049 Prepared for: California Energy Commission Dustin Davis Contract Manager Virginia Lew

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary Diego, CA 92182-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT STANDARDS, RULES, AND ISSUES FOR INTEGRATION OF RENEWABLE RESOURCES SEPTEMBER 2010 CEC-500-2013-149 Prepared for: California Energy Commission for: California Energy Commission Steve Ghadiri Contract Manager Fernando Pina Office Manager Energy

  7. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT TECHNICAL BRIEFS: California Energy Commission Prepared by: E SOURCE #12; PREPARED BY: Primary Author(s): Ira Krepchin-03-005 Prepared for: California Energy Commission David Weightman Contract Manager Virginia Lew Office Manager

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT PILOT PHASE OF A FIELD STUDY TO DETERMINE WASTE OF WATER AND ENERGY IN RESIDENTIAL HOT WATER DISTRIBUTION SYSTEMS JULY 2009 CEC-500-2013-135 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12;PREPARED

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT EFFICIENT HEAT AND POWER SYSTEMS FOR CHP APPLICATIONS MARCH 2012 CEC-500-2014-002 Prepared for: California Energy Commission Prepared by-003 Prepared for: California Energy Commission Mike Kane Contract Manager Linda Spiegel Office Manager Energy

  10. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING5002013083AP Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

  11. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

  12. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy Commission Raquel E. Kravitz

  13. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT LIFECYCLE ENERGY: California Energy Commission Prepared by: University of California, Berkeley Department of Civil-1712 510-642-7300 Contract Number: 500-02-004 Work Authorization MR-048 Prepared for: California Energy

  14. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT TIME OF USE WATER METER IMPACTS · Transportation Time-of-Use Water Meter Impacts on Customer Water Use is the final report for the Time of Use This report was prepared as the result of work sponsored by the California Energy Commission. It does

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    to Help Californians Design Zero Net Energy Homes MARCH 2013 CEC-500-2013-116 Prepared for: California: · Buildings End-Use Energy Efficiency · Energy Innovations Small Grants · Energy-Related Environmental is the final report of this project to develop Two Software Tools to Help Californians Design Zero Net Energy

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT COMPENSATION CEC5002013114 Prepared for: California Energy Commission Prepared by: Stratus Consulting Inc. #12-04-025 Prepared for: California Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy

  17. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT THE ICHTHYOPLANKTON OF KING HARBOR, REDONDO BEACH, CALIFORNIA 19742006 APRIL 2008 CEC5002013053 Prepared for: California Energy Angeles, CA 90041 Contract Number: 500-04-025 Prepared for: California Energy Commission Joseph O

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ADVANCED CHARACTERIZATION OF WIND RESOURCES IN SELECTED FOCUS AREAS OF CALIFORNIA Prepared for: California Energy Commission Prepared by: AWS-06-024 Prepared for: California Energy Commission Mike Kane Contract Manager Linda Spiegel Office Manager Energy

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT REDUCTIONS IN URBAN OUTDOOR WATER USE-2013-152 Prepared for: California Energy Commission Prepared by: University of California #12;PREPARED BY: Primary of California, Los Angeles Contract Number: PIR-08-005 Prepared for: California Energy Commission Joseph O

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA TRANSMISSION CONGESTION ASSESSMENT DECEMBER 2007 CEC-500-2011-007 Prepared for: California Energy Commission Prepared by: Electric Pasadena, CA Contract Number: BOA-142 Prepared for: California Energy Commission Jamie Patterson Contract

  1. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT AN ECONOMIC ANALYSIS OF SIX DAIRY DIGESTER SYSTEMS IN CALIFORNIA Volume 2 MARCH 2013 CEC-500-2014-001-V2 Prepared for: California Energy: California Energy Commission Abolghasem Edalati Contract Manager Linda Spiegel Office Manager Energy

  2. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT PROBABILISTIC TRANSMISSION CONGESTION FORECASTING DECEMBER 2012 CEC-500-2013-120 Prepared for: California Energy Commission Prepared by: Electric Research Institute Contract Number: UC MR-052 Prepared for: California Energy Commission Jamie Patterson

  3. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT LIFE-CYCLE ASSESSMENT AND URBAN SUSTAINABILITY OCTOBER 2010 CEC-500-2013-129 Prepared for: California Energy Commission Prepared by: University for: California Energy Commission Erik Stokes Contract Manager Linda Spiegel Office Manager Energy

  4. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT COMMERCE ENERGY BIOGAS/PV MINIGRID in California APRIL 2012 CEC-500-2013-127 Prepared for: California Energy Commission Prepared by: CH2MHill #12 Number: 500-00-036 Prepared for: California Energy Commission Zhiqin Zhang Contract Manager Linda Spiegel

  5. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT RADIANT HEATING AND COOLING AND MEASURED HOME PERFORMANCE FOR CALIFORNIA HOMES JUNE 2013 CEC-500-2013-153 Prepared for: California Energy-Use Energy Efficiency · Renewable Energy Technologies · Transportation Radiant Heating and Cooling

  6. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Edison Taylor Engineering The New York Times TRACO University of California, Berkeley UniversityEnergy Research and Development Division FINAL PROJECT REPORT HIGH PERFORMANCE BUILDING FAĂ?ADE SOLUTIONS NOVEMBER 2009 CEC-500-2012-049 Prepared for: California Energy Commission Prepared by: Lawrence

  7. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT NATURAL GAS OPTIMIZED ADVANCED HEAVY · Renewable Energy Technologies · Transportation Natural Gas-optimized Advanced Heavy-duty Engine is the final&R 412 88, Gothenburg, Sweden Telephone: +46-31-3220998 Mobile: +46-7390-20998 Contract Number: PIR-08

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT NOVEMBER 2010 CEC5002013048 Prepared for: California Energy Commission Prepared by: California Biomass Collaborative BIOFUELS as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views

  9. Digital Media Curriculum Development Project Yue-Ling Wong

    E-Print Network [OSTI]

    Burg, Jennifer J.

    Digital Media Curriculum Development Project Yue-Ling Wong Computer Science Department Art University USA burg@wfu.edu Abstract: This paper presents and discusses an interdisciplinary digital media for a digital media curriculum that addresses both the technical and the aesthetic elements of multimedia

  10. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    -Use Energy Efficiency · Renewable Energy Technologies · Transportation The Value of Natural Gas StorageEnergy Research and Development Division FINAL PROJECT REPORT THE VALUE OF NATURAL GAS STORAGE AND THE IMPACT OF RENEWABLE GENERATION ON CALIFORNIA'S NATURAL GAS INFRASTRUCTURE DECEMBER 2009 CEC-500

  11. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    · Renewable Energy Technologies · Transportation Production of Substituted Natural Gas from the Wet Organic Renewable natural gas has been identified by the California Energy Commission as an important alternativeEnergy Research and Development Division FINAL PROJECT REPORT Production of Substituted Natural

  12. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    that use natural gas water heaters could see their annual natural gas water heating consumption drop by 35Energy Research and Development Division FINAL PROJECT REPORT WATER HEATING DESIGN GUIDE DECEMBER · Environmentally Preferred Advanced Generation · Industrial/Agricultural/Water End-Use Energy Efficiency

  13. PROJECT GOALS Develop a framework for the documentation of

    E-Print Network [OSTI]

    PROJECT GOALS Develop a framework for the documentation of proposed `People' and `Integration A set of seven spreadsheet documents, each with multiple sheets, collating data on proposed indicators is ongoing and involves the collation of data from newsletters, staff documents, media reports, previous

  14. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect (OSTI)

    None

    1980-09-08T23:59:59.000Z

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  15. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  16. PROJECT GOALS This project involved the development of the first Carbon

    E-Print Network [OSTI]

    emissions, which will in turn allow prioritisation of actions to reduce the ANU carbon footprint. TYPEPROJECT GOALS This project involved the development of the first Carbon Emissions Inventory report and master Excel spreadsheet Figure 1: ANU Carbon Emission by Category (t CO2e) DESCRIPTION

  17. Final project report: High energy rotor development, test and evaluation

    SciTech Connect (OSTI)

    NONE

    1996-09-01T23:59:59.000Z

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  18. Development of free-electron lasers for xuv projection lithography

    SciTech Connect (OSTI)

    Newnam, B.E.

    1990-01-01T23:59:59.000Z

    Future rf-linac-driven FELs, operating in the range from 4 nm to 100 nm, could be excellent exposure tools for extending the resolution limit of projection optical lithography to {le}0.1 {mu}m and with adequate total depth of focus (1 to 2 {mu}m). When operated at a moderate duty rate of {ge}1%, XUV FELs should be able to supply sufficient average power to support high-volume chip production. Recent developments of the electron beam, magnetic undulator, and resonator mirrors are described which raise our expectation that FEL operation below 100 nm is almost ready for demonstration. Included as a supplement is a review of initial design studies of the reflecting XUV projection optics, fabrication of reflection masks, characterization of photoresists, and the first experimental demonstrations of the capability of projection lithography with 14-nm radiation to produce lines and spaces as small as 0.05 {mu}m. 88 refs., 10 figs.

  19. Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

    Broader source: Energy.gov [DOE]

    Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

  20. START Program for Renewable Energy Project Development Assistance – Round Three Application

    Broader source: Energy.gov [DOE]

    Download the application for the START Program for Renewable Energy Project Development Assistance–Round Three.

  1. 2013 Commercial-Scale Tribal Renewable Energy Project Development and Finance Workshop Presentations and Agenda

    Broader source: Energy.gov [DOE]

    Presentations from the 2013 Commercial-Scale Tribal Renewable Energy Project Development and Finance Workshop

  2. Integrated development and testing plan for the plutonium immobilization project

    SciTech Connect (OSTI)

    Kan, T.

    1998-07-01T23:59:59.000Z

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium-containing ceramic forms within large canisters of high level waste (HLW) glass. Deployment of the immobilization capability should occur by 2006 and be completed within 10 years.

  3. Energy Efficient Community Development in California: Chula Vista Research Project

    SciTech Connect (OSTI)

    Gas Technology Institute

    2009-03-31T23:59:59.000Z

    In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, the central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing energy utility networks; (d) Alternative land-use design and development options and their impact on energy efficiency and urban runoff, emissions and the heat island effect; and (e) Alternative transportation and mobility options and their impact on local emissions. (2) Creating Energy-Efficient Communities in California: A Reference Guide to Barriers, Solutions and Resources report provides the results of an effort to identify the most innovative existing and emerging public policy, incentive and market mechanisms that encourage investment in advanced energy technologies and enabling community design options in the State of California and the nation. The report evaluates each of these mechanisms in light of the preceding research and concludes with a set of recommended mechanisms designed for consideration by relevant California State agencies, development and finance industry associations, and municipal governments. (3) Creating Energy-Efficient Communities in California: A Technical Reference Guide to Building and Site Design report contains a set of selected commercially viable energy technology and community design options for high-efficiency, low-impact community development in California. It includes a summary of the research findings referenced above and recommendations for energy technology applications and energy-efficient development strategies for residential, commercial and institutional structures and supporting municipal infrastructure for planned communities. The document also identifies design options, technology applications and development strategies that are applicable to urban infill projects.

  4. GRADUATE FACULTY-STUDENT PROJECT: School of Management Development Office: Marketing and Development Intern

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    GRADUATE FACULTY-STUDENT PROJECT: School of Management Development Office: Marketing of Management in proposal presentation and donor relation/cultivation activities; prepare proposals and develop & Student Records, SW-119, by 4:00 pm Friday, July 15, 2011. NAME UNIVERSITY B# Best Phone # to contact you

  5. Technology status and project development risks of advanced coal power generation technologies in APEC developing economies

    SciTech Connect (OSTI)

    Lusica, N.; Xie, T.; Lu, T.

    2008-10-15T23:59:59.000Z

    The report reviews the current status of IGCC and supercritical/ultrasupercritical pulverized-coal power plants and summarizes risks associated with project development, construction and operation. The report includes an economic analysis using three case studies of Chinese projects; a supercritical PC, an ultrasupercritical PC, and an IGCC plant. The analysis discusses barriers to clean coal technologies and ways to encourage their adoption for new power plants. 25 figs., 25 tabs.

  6. Project Develops Student-Stakeholders | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProject Develops Student-Stakeholders

  7. Project Management Development Company PMD | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroupPerfectenergyInformationProject Management Development Company PMD

  8. MATERIALS AND COMPONENT DEVELOPMENT FOR ADVANCED TURBINE SYSTEMS ? PROJECT SUMMARY

    SciTech Connect (OSTI)

    M. A. Alvin

    2010-06-18T23:59:59.000Z

    Future hydrogen-fired or oxy-fuel turbines will likely experience an enormous level of thermal and mechanical loading, as turbine inlet temperatures (TIT) approach ?1425-1760?C (?2600-3200?F) with pressures of ?300-625 psig, respectively. Maintaining the structural integrity of future turbine components under these extreme conditions will require (1) durable thermal barrier coatings (TBCs), (2) high temperature creep resistant metal substrates, and (3) effective cooling techniques. While advances in substrate materials have been limited for the past decades, thermal protection of turbine airfoils in future hydrogen-fired and oxy-fuel turbines will rely primarily on collective advances in the TBCs and aerothermal cooling. To support the advanced turbine technology development, the Office of Research and Development (ORD) at National Energy Technology Laboratory (NETL) has continued its collaborative research efforts with the University of Pittsburgh and West Virginia University, while working in conjunction with commercial material and coating suppliers. This paper presents the technical accomplishments that were made during FY09 in the initial areas of advanced materials, aerothermal heat transfer and non-destructive evaluation techniques for use in advanced land-based turbine applications in the Materials and Component Development for Advanced Turbine Systems project, and introduces three new technology areas ? high temperature overlayer coating development, diffusion barrier coating development, and oxide dispersion strengthened (ODS) alloy development that are being conducted in this effort.

  9. Management of a large distributed control system development project

    SciTech Connect (OSTI)

    Gurd, D. P. (David P.)

    2002-01-01T23:59:59.000Z

    Building an accelerator at six geographically dispersed sites is quite mad, but politically expedient. The Spallation Neutron Source (SNS), currently under construction in Oak Ridge, Tennessee, combines a pulsed 1 Gev H{sup -} superconducting linac with a compressor ring to deliver 2 MW of beam power to a liquid mercury target for neutron production [1]. Accelerator components, target and experimental (neutron-scattering) instruments are being developed collaboratively by Lawrence Berkeley (Ion Source and Front End), Los Alamos (Linac), Thomas Jefferson (Cryosystems), Brookhaven (Compressor Ring), Oak Ridge (Target and Conventional Facilities) and Argonne (Neutron Scattering Instruments) National Laboratories. Similarly, a team distributed among all of the participating laboratories is developing the EPICS-based control system. this paper discusses the management model and strategies being used to address the unusual issues of organization, communication, standardization, integration and hand-off inherent in this widely-distributed project.

  10. Project Report on Development of a Safeguards Approach for Pyroprocessing

    SciTech Connect (OSTI)

    Robert Bean

    2010-09-01T23:59:59.000Z

    The Idaho National Laboratory has undertaken an effort to develop a standard safeguards approach for international commercial pyroprocessing facilities. This report details progress for the fiscal year 2010 effort. A component by component diversion pathway analysis has been performed, and has led to insight on the mitigation needs and equipment development needed for a valid safeguards approach. The effort to develop an in-hot cell detection capability led to the digital cloud chamber, and more importantly, the significant potential scientific breakthrough of the inverse spectroscopy algorithm, including the ability to identify energy and spatial location of gamma ray emitting sources with a single, non-complex, stationary radiation detector system. Curium measurements were performed on historical and current samples at the FCF to attempt to determine the utility of using gross neutron counting for accountancy measurements. A solid cost estimate of equipment installation at FCF has been developed to guide proposals and cost allocations to use FCF as a test bed for safeguards measurement demonstrations. A combined MATLAB and MCNPX model has been developed to perform detector placement calculations around the electrorefiner. Early harvesting has occurred wherein the project team has been requested to provide pyroprocessing technology and safeguards short courses.

  11. Alaska Oil and Gas Exploration, Development, and Permitting Project

    SciTech Connect (OSTI)

    Richard McMahon; Robert Crandall

    2006-03-31T23:59:59.000Z

    This is the final technical report for Project 15446, covering the grant period of October 2002 through March 2006. This project connects three parts of the oil exploration, development, and permitting process to form the foundation for an advanced information technology infrastructure to better support resource development and resource conservation. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. The broad goal of this grant is to increase domestic production from Alaska's known producing fields through the implementation of preferred upstream management practices. (PUMP). Internet publication of extensive and detailed geotechnical data is the first task, improving the permitting process is the second task, and building an advanced geographical information system to offer continuing support and public access of the first two goals is the third task. Excellent progress has been made on all three tasks; the technical objectives as defined by the approved grant sub-tasks have been met. The end date for the grant was March 31, 2006.

  12. CoolCab Thermal Load Reduction Project: CoolCalc HVAC Tool Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermal Load Reduction Project: CoolCalc HVAC Tool Development CoolCab Thermal Load Reduction Project: CoolCalc HVAC Tool Development 2010 DOE Vehicle Technologies and Hydrogen...

  13. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect (OSTI)

    Connie Smith-Holbert; Joseph Petrolino; Bart Watkins; David Irick

    2011-12-31T23:59:59.000Z

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engineâ??s commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

  14. Present Status of the ILC Project and Development

    SciTech Connect (OSTI)

    Ross, M.; /Fermilab; Walker, N.; /DESY; Yamamoto, A.; /KEK, Tsukuba

    2011-09-01T23:59:59.000Z

    The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    the Energy Commission at 9163271551. #12;iii ABSTRACT This well drilling and testing project is part, California (Modoc County). The current project drilled a 3,852 ft. geothermal well to identify and evaluate

  16. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  17. DOE Regional Tribal Energy Project Development and Finance Workshops...

    Energy Savers [EERE]

    hands-on training on how to use technology resource assessment tools, and hear project case studies and lessons learned from other Tribes. Gerald Warrington of the Menominee...

  18. Applications for START Clean Energy Project Development Technical...

    Energy Savers [EERE]

    Establishing terms and strategies for negotiating land-lease, energy off-take, andor power purchase agreements Selecting project ownership options, partnership arrangements,...

  19. FAO Global Inventory of Agricultural Mitigation Projects in Developing...

    Open Energy Info (EERE)

    be reduced and sinks created in biomass and soils while increasing resilience and productivity. The project will contribute to ongoing research and implementation work of such...

  20. agricultural development project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    innovation among the urban public: an analysis of the pilot study phase of the San Antonio Evapotranspiration Project--a cooperative effort between the Texas...

  1. DOE Office of Indian Energy Project Development and Finance Course...

    Broader source: Energy.gov (indexed) [DOE]

    renewable energy based on the electrical output of the project in kilowatt hours 10 PV - photovoltaic. This is a solar resource converter to electricity. R Remaining Life - the...

  2. Risks and decision making in development of new power plant projects

    E-Print Network [OSTI]

    Kristinsdottir, Asbjorg

    2012-01-01T23:59:59.000Z

    Power plant development projects are typically capital intensive and subject to a complex network of interconnected risks that impact development's performance. Failure to develop a power plant to meet performance constraints ...

  3. Guide to Community Solar: Utility, Private, and Non-Profit Project Development (Fact Sheet)

    SciTech Connect (OSTI)

    Ruckman, K.

    2011-03-01T23:59:59.000Z

    This fact sheet provides an overview of the DOE Solar America Communities report Guide to Community Solar: Utility, Private, and Non-profit Project Development.

  4. Community Renewable Energy Success Stories Webinar: Developing PV Projects with RFPs and PPAs (text version)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Below is the text version of the webinar titled "Developing PV Projects with RFPS and PPAS," originally presented on January 15, 2013.

  5. Energy Project Development and Financing Strategy for Native Alaska (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-04-01T23:59:59.000Z

    This DOE Office of Indian Energy fact sheet describes the energy project development process with a focus on Alaska Native villages and regional corporations.

  6. Oklahoma Renewable Energy Project Development and Finance Workshop...

    Office of Environmental Management (EM)

    1:00-2:00 p.m. Step 3: Project Refinement Activity Jason Coughlin, NREL Activity: Finance Advantages and Disadvantages Objective: Get to know the financial options that are...

  7. Geothermal Energy Research and Development Program; Project Summaries

    SciTech Connect (OSTI)

    None

    1994-03-01T23:59:59.000Z

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    AND BIOFUEL DEMONSTRATION PROJECT Oceanside Water Pollution Control Plant Prepared forRelated Environmental Research · Energy Systems Integration · Environmentally Preferred Advanced Generation Brown Grease Recovery and Biofuel Demonstration: Oceanside Water Pollution Control Plant Final Report

  9. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    confirmed the ISX11.9 G technical feasibility for Class 8 regional haul and vocational truck applications of the fuel in the engine. The resulting natural gas engine was identified as "ISX11.9 G." The project team

  10. Energy Department Announces New Innovative Projects to Develop...

    Broader source: Energy.gov (indexed) [DOE]

    pilot-scale biorefinery projects selected today will use a variety of non-food biomass feedstocks, waste-based materials, and algae in innovative conversion processes to produce...

  11. Developing a total replacement cost index for suburban office projects

    E-Print Network [OSTI]

    Hansen, David John, S.M. Massachusetts Institute of Technology

    2006-01-01T23:59:59.000Z

    Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

  12. Waterfront developments in the Middle East case study : the Golden Horn Project, Istanbul, Turkey

    E-Print Network [OSTI]

    Alamuddin, Hana S. (Hana Slieman)

    1987-01-01T23:59:59.000Z

    This thesis examines waterfront developments in the Middle East . It concentrates on the Golden Horn project in Istanbul as it raises a number of issues that are central to any such development in that region. In order for ...

  13. World Bank-Low-carbon Energy Projects for Development in Sub...

    Open Energy Info (EERE)

    Development in Sub-Saharan Africa Jump to: navigation, search Name Low-carbon Energy Projects for Development in Sub-Saharan Africa AgencyCompany Organization World Bank Sector...

  14. History of the development of the Wilmington oilfield and its EOR projects

    SciTech Connect (OSTI)

    Colazas, X.C. [City of Long Beach, CA (United States)

    1994-12-31T23:59:59.000Z

    The City of Long Beach sits atop one of the largest oil fields in the world, the Wilmington Oilfield. Four areas are described: historical development of the Wilmington Oilfield, the environmental problem of subsidence, the present development and future plans for the Wilmington Oilfield including the EOR projects, and the projects about to be undertaken.

  15. INTERNAL PROJECT INFORMATION NOTE 10/08 Title: CCF Harvesting Method Development: Harvester Head

    E-Print Network [OSTI]

    INTERNAL PROJECT INFORMATION NOTE 10/08 Title: CCF Harvesting Method Development: Harvester Head PROJECT INFORMATION NOTE 10/08 Ref 1200A/56/07 CCF Harvesting Method Development: Harvester Head Visibility SUMMARY The use of Continuous Cover Forestry (CCF) can lead to situations where a dense

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    -2013-156 Prepared for: California Energy Commission Prepared by: SolarTech #12;PREPARED BY: Primary Author(s): David for their support. Without their dedication, this work would not have been possible. SolarTech Grant Project Manager SolarTech Executive Management David McFeely Director, Industry Solutions and Grant Programs, Solar

  17. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    National Laboratory #12; Prepared by: Primary Author(s): Mark Morgan, Project Manager (PNNL) Ian Dobson (PNNL) Nader Samaan (PNNL) David Newman (University of Alaska) Siri Varadan (KEMA) Pacific Northwest National Laboratory (PNNL) 902 Battelle Boulevard P.O. Box 999, MSIN K1-85 Richland, WA 99352 509

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    and negotiated the particularly complex permitting process for the field work conducted as part of this project and coaching on the GRDA process; Dr. Joseph Moore and his team at the Energy and Geoscience Institute from a digital format proprietary to Unocal. In the 1980's and 1990's, Mr. Nordquist, with Mr. Daniel

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    AND CARB EMISSIONS COMPLIANT HPDI LNG TRUCK APRIL 2011 CEC-500-2013-128 Prepared for: California Energy of a 2010 CARB and EPA Emissions Compliant HPDI LNG Truck is the final report for the Certification and Field Demonstration of a 0.2g/bhp-hr NOx HPDI LNG Truck project (contract number 500-08-043) conducted

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    use ambient air to cool and condense steam and therefore use no water. The performance of AirCooled Condensers is the final report for the Field Testing and Computational Fluid Dynamic modeling of Wind Effects on AirCooled Condensers project (Contract Number 50007003) conducted by John

  1. Projects at the Component Development and Integration Facility. Quarterly technical progress report, July 1--September 30, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the first quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: MHD Proof-of-Concept project; mine waste technology pilot program; plasma projects; resource recovery project; sodium sulfide/ferrous sulfate project; soil washing project; and spray casting project.

  2. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  3. Research and Development Technology Development Roadmaps for the Next Generation Nuclear Plant Project

    SciTech Connect (OSTI)

    Ian McKirdy

    2011-07-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has selected the high temperature gas-cooled reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for process heat, hydrogen and electricity production. The reactor will be graphite moderated with helium as the primary coolant and may be either prismatic or pebble-bed. Although, final design features have not yet been determined. Research and Development (R&D) activities are proceeding on those known plant systems to mature the technology, codify the materials for specific applications, and demonstrate the component and system viability in NGNP relevant and integrated environments. Collectively these R&D activities serve to reduce the project risk and enhance the probability of on-budget, on-schedule completion and NRC licensing. As the design progresses, in more detail, toward final design and approval for construction, selected components, which have not been used in a similar application, in a relevant environment nor integrated with other components and systems, must be tested to demonstrate viability at reduced scales and simulations prior to full scale operation. This report and its R&D TDRMs present the path forward and its significance in assuring technical readiness to perform the desired function by: Choreographing the integration between design and R&D activities; and proving selected design components in relevant applications.

  4. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01T23:59:59.000Z

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  5. Development projects in Pakistan are hiring increasing numbers of Pakistani female professionals to work on rural projects that

    E-Print Network [OSTI]

    Richner, Heinz

    Development projects in Pakistan are hiring increasing numbers of Pakistani female professionals. Policy message n Pakistan is a highly gender-segregated society, and more well-qualified female field for well-educat- ed Pakistani women Pakistan has one of the lowest female labour force

  6. Modifying organization design and development process to mitigate project delay in microprocessor product development

    E-Print Network [OSTI]

    Hou, Tianlue

    2007-01-01T23:59:59.000Z

    In today's engineering project management, there is no lack of strategies to plan and assign task items to reduce the overall project timeline. However, as the product gets more complicated and organization gets much larger, ...

  7. antenna development project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    achieving sufficient antenna Elsherbeni, Atef Z. 4 Design and development of novel fractal antennas for wireless applications; -. Open Access Theses and Dissertations Summary:...

  8. Project Profile: High-Temperature Solar Selective Coating Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selective Coating Development for Power Tower Receivers Sandia National Laboratories logo Sandia National Laboratories (SNL), under the National Laboratory R&D competitive...

  9. Commercial-Scale Renewable Energy Project Development Workshop: Colorado |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1.Space Data CorporationPast Projects »Department of

  10. Commercial-Scale Renewable Energy Project Development and Finance Workshop:

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1.Space Data CorporationPast Projects »Department

  11. Energy Department Announces New Innovative Projects to Develop Advanced

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEAWaterCool Roofs EnergyVehicleProject |Investments toDrop-in

  12. Project Profile: Low-Cost Heliostat Development | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring Solar forProjectDepartment of

  13. Projects To Develop Novel Monitoring Networks for Advanced Power Systems

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartmentGasInformationPrimusProgramProject Mgt || DepartmentSelected |

  14. Tanzania Energy Development and Access Expansion Project | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolar Jump to:Holdings Co08.0Information Expansion Project Jump to:

  15. Landfill Methane Project Development Handbook | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluatingGroup |Jilin Zhongdiantou NewKorea PartsLLNLLaizhouLand O LakesMethane Project

  16. Composting projects under the Clean Development Mechanism: Sustainable contribution to mitigate climate change

    SciTech Connect (OSTI)

    Rogger, Cyrill [Department for Management, Technology, and Economics, ETH Zurich, Kreuzplatz 5, 8032 Zurich (Switzerland); Beaurain, Francois [South Pole Carbon Asset Management Ltd., Switzerland, Technoparkstr. 1, 8005 Zurich (Switzerland); Schmidt, Tobias S., E-mail: tobiasschmidt@ethz.ch [Department for Management, Technology, and Economics, ETH Zurich, Kreuzplatz 5, 8032 Zurich (Switzerland)

    2011-01-15T23:59:59.000Z

    The Clean Development Mechanism (CDM) of the Kyoto Protocol aims to reduce greenhouse gas emissions in developing countries and at the same time to assist these countries in sustainable development. While composting as a suitable mitigation option in the waste sector can clearly contribute to the former goal there are indications that high rents can also be achieved regarding the latter. In this article composting is compared with other CDM project types inside and outside the waste sector with regards to both project numbers and contribution to sustainable development. It is found that, despite the high number of waste projects, composting is underrepresented and a major reason for this fact is identified. Based on a multi-criteria analysis it is shown that composting has a higher potential for contribution to sustainable development than most other best in class projects. As these contributions can only be assured if certain requirements are followed, eight key obligations are presented.

  17. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    : FEDERSPIEL CONTROLS (NOW VIGILENT) AND STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES DATA CENTER ENERGY EFFICIENT COOLING CONTROL DEMONSTRATION Achieving Instant Energy Savings with Vigilent Office Manager Energy Efficiency Research Office Laurie ten Hope Deputy Director RESEARCH AND DEVELOPMENT

  18. Sequential investment planning for complex oil development projects

    E-Print Network [OSTI]

    Ayd?n, Cevat Onur

    2008-01-01T23:59:59.000Z

    In this thesis, we consider sequential real investment decisions for the development of discovered oil prospects. Following a decision analysis approach, we propose a methodology to explore the upside of a dynamic drilling ...

  19. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities: Large-Scale Renewable Energy Guide

    Broader source: Energy.gov [DOE]

    Guide helps agency personnel navigate the complexities of developing large-scale renewable energy projects and assists them in attracting the necessary private capital to complete these projects. It also serves as a general resource to develop Federal employees' awareness and understanding of a project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment.

  20. TWRS privatization support project waste characterization database development

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    Pacific Northwest National Laboratory requested support from ICF Kaiser Hanford Company in assembling radionuclide and chemical analyte sample data and inventory estimates for fourteen Hanford underground storage tanks: 241-AN-102, -104, -105, -106, and -107, 241-AP-102, -104, and -105, 241-AW-101, -103, and -105, 241 AZ-101 and -102; and 241-C-109. Sample data were assembled for sixteen radionuclides and thirty-five chemical analytes. The characterization data were provided to Pacific Northwest National Laboratory in support of the Tank Waste Remediation Services Privatization Support Project. The purpose of this report is to present the results and document the methodology used in preparing the waste characterization information data set to support the Tank Waste Remediation Services Privatization Support Project. This report describes the methodology used in assembling the waste characterization information and how that information was validated by a panel of independent technical reviewers. Also, contained in this report are the various data sets created: the master data set, a subset, and an unreviewed data set. The master data set contains waste composition information for Tanks 241-AN-102 and -107, 241-AP-102 and -105, 241-AW-101; and 241-AZ-101 and -102. The subset contains only the validated analytical sample data from the master data set. The unreviewed data set contains all collected but unreviewed sample data for Tanks 241-AN-104, -105, and -106; 241-AP-104; 241-AW-103 and-105; and 241-C-109. The methodology used to review the waste characterization information was found to be an accurate, useful way to separate the invalid or questionable data from the more reliable data. In the future, this methodology should be considered when validating waste characterization information.

  1. SCINTILLA A European project for the development of scintillation detectors and new technologies for nuclear security

    E-Print Network [OSTI]

    A. Alemberti; M. Battaglieri; E. Botta; R. De Vita; E. Fanchini; G. Firpo

    2014-04-14T23:59:59.000Z

    Europe monitors transits using radiation detectors to prevent illicit trafficking of nuclear materials. The SCINTILLA project aims to develop a toolbox of innovative technologies designed to address different usage cases. This article will review the scope, approach, results of the first benchmark campaign and future plans of the SCINTILLA project.

  2. TECHNICAL EVALUATIONS AND ANALYSIS OF CURRENTLY FUNDED PROJECTS AND DATABASE DEVELOPMENT

    E-Print Network [OSTI]

    to the National Energy Technology Laboratory involves analyses and feasibility studies on certain niche marketsTECHNICAL EVALUATIONS AND ANALYSIS OF CURRENTLY FUNDED PROJECTS AND DATABASE DEVELOPMENT Edward G- visit-based analyses of hydrogen technology projects are the latest in a series of some forty

  3. High field superconductor development and understanding project, Final Report

    SciTech Connect (OSTI)

    Larbalestier, David C.; Lee, Peter J.

    2009-07-15T23:59:59.000Z

    Over 25 years the Applied Superconductivity Center at the University of Wisconsin-Madison provided a vital technical resource to the High Energy Physics community covering development in superconducting strand for HEP accelerator magnet development. In particular the work of the group has been to develop the next generation of high field superconductors for high field application. Grad students Mike Naus, Chad Fischer, Arno Godeke and Matt Jewell improved our understanding of the microstructure and microchemistry of Nb3Sn and their impact on the physical and mechanical properties. The success of this work has led to the continued funding of this work at the ASC after it moved to the NHMFL and also to direct funding from BNL for some aspects of Nb3Sn cable evaluation.

  4. Folded Compact Range Development and Coherent Change Detection Measurement Project

    SciTech Connect (OSTI)

    Sorensen, K.W.

    1995-03-01T23:59:59.000Z

    A novel, folded compact range configuration has been developed at the Sandia National Laboratories compact range antenna and radar cross section measurement facility, operated by the Radar/Antenna Department 2343, as a means of performing indoor, environmentally-controlled, far-field simulations of synthetic aperture radar (SAR) coherent change detection (CCD) measurements. This report describes the development of the folded compact range configuration, as well as the initial set of coherent change detection measurements made with the system. These measurements have been highly successful, and have demonstrated the viability of the folded compact range concept in simulating SAR CCD measurements. It is felt that follow-on measurements have the potential of contributing significantly to the body of knowledge available to the scientific community involved in CCD image generation and processing, and that this tool will be a significant aid in the research and development of change detection methodologies.

  5. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

  6. Larger Teaching and Learning Development Projects Proposal Criteria (3 pages maximum)

    E-Print Network [OSTI]

    . A. Question(s) to be investigated. (Usually will be focused on student Larger Teaching and Learning Development Projects Proposal Criteria (3 learning) B. General Rationale and Description: Why is this question

  7. Guide to Community Solar: Utility, Private, and Non-profit Project Development

    SciTech Connect (OSTI)

    Not Available

    2011-01-01T23:59:59.000Z

    This guide is designed as a resource for those who want to develop community solar projects, from community organizers or solar energy advocates to government officials or utility managers.

  8. Real options : a way to deal with market uncertainty in real estate development projects

    E-Print Network [OSTI]

    Kim, Kyungwon

    2008-01-01T23:59:59.000Z

    The practice of applying options theory to real estate investments has only recently begun. In particular, options in real estate are called "real options." Real options add value to real estate development projects by ...

  9. Conceptual Design Phase of Project on Design and Development of Airships for Transportation of Goods

    E-Print Network [OSTI]

    Ramu, Palaniappan

    Conceptual Design Phase of Project on Design and Development of Airships for Transportation Team 2 Literature Review 3 Requirements Capture 4 Discussions with Airship Manufacturers 5 Identification of Vendors and Resource Agencies 6 Regulations related to airship design, manufacture

  10. A multiperiod optimization model to schedule large-scale petroleum development projects

    E-Print Network [OSTI]

    Husni, Mohammed Hamza

    2009-05-15T23:59:59.000Z

    This dissertation solves an optimization problem in the area of scheduling large-scale petroleum development projects under several resources constraints. The dissertation focuses on the application of a metaheuristic search Genetic Algorithm (GA...

  11. Seven Projects That Will Advance Solid Oxide Fuel Cell Research Selected by DOE for Further Development

    Broader source: Energy.gov [DOE]

    Seven projects that will help develop low-cost solid oxide fuel cell technology for environmentally responsible central power generation from the Nation’s abundant fossil energy resources have been selected for further research by the Department of Energy.

  12. Electric and Magnetic Fields (EMF) RAPID Engineering Program, Project 7: Development of Field Exposure Models

    SciTech Connect (OSTI)

    Bracken, T.D.; Rankin, R.F.; Wiley, J.A.

    1999-05-01T23:59:59.000Z

    The purpose of this project was to develop a conceptual model for estimating magnetic field (EMF) personal exposure (PE) of individuals or groups and construct a working model using existing data.

  13. The development of a methodology to quantify the impacts of information management strategies on EPC projects 

    E-Print Network [OSTI]

    Moreau, Karen Anne

    1997-01-01T23:59:59.000Z

    This research develops and demonstrates a methodology to quantify time and cost impacts on Engineering, Procurement, and Construction (EPC) projects resulting from information management driven process changes in design related activities. Many...

  14. The development of a methodology to quantify the impacts of information management strategies on EPC projects

    E-Print Network [OSTI]

    Moreau, Karen Anne

    1997-01-01T23:59:59.000Z

    This research develops and demonstrates a methodology to quantify time and cost impacts on Engineering, Procurement, and Construction (EPC) projects resulting from information management driven process changes in design related activities. Many...

  15. Research and Development of Information on Geothermal Direct Heat Application Projects

    SciTech Connect (OSTI)

    Hederman, William F., Jr.; Cohen, Laura A.

    1981-10-01T23:59:59.000Z

    This is the first annual report of ICF's geothermal R&D project for the Department of Energy's Idaho Operations Office. The overall objective of this project is to compile, analyze, and report on data from geothermal direct heat application projects. Ultimately, this research should convey the information developed through DOE's and Program Opportunity Notice (PON) activities as well as through other pioneering geothermal direct heat application projects to audiences which can use the early results in new, independent initiatives. A key audience is potential geothermal investors.

  16. Assessing Network Applications for Economic Development Sustainable Access in Rural India (SARI) Project

    E-Print Network [OSTI]

    Gabrieli, John

    Assessing Network Applications for Economic Development Sustainable Access in Rural India (SARI Department of Electric Engineering MIT Media Laboratory- eDevelopment Group #12;SUSTAINABLE ACCESS IN RURAL) Project Pilot Phase Assessment ­ Madurai District, Tamil Nadu, India Professor Michael Best Director, eDevelopment

  17. Flight Projects 2 Technology and Space Program Development 13

    E-Print Network [OSTI]

    Waliser, Duane E.

    Ellerest when the picture was taken; the western Pacific Ocean, western Australia, and eastern Asia system, the practical utilization of space, and in the development of new energy technologies are steadily approaching the goal of providing solar cell arrays at a cost com- petitive with other energy

  18. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Lu (PNNL). The development of the dynamic phasor model was led by Bernard Lesieutre (LBNL by David Chassin (PNNL). The research for the white paper on load monitoring was conducted by Henry Huang (PNNL). The research for the white paper on uncertainty analysis was conducted by Ian Hiskens

  19. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    model was led by Henry Huang and Ning Lu (PNNL). The development of the dynamic phasor model was led data tool was conducted by David Chassin (PNNL). The research for the white paper on load monitoring was conducted by Henry Huang (PNNL). The research for the white paper on uncertainty analysis was conducted

  20. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Francisco, CA 94114-1600 Contract Number: GEO-02-007 Prepared for: California Energy Commission Geothermal developers for leases on federal land in California. Under the Geothermal Program, the California Energy related to geothermal energy. The purpose of the program is to enhance and promote geothermal

  1. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    of the Energy & Geoscience Institute at the University of Utah for access to core samples and his geothermal developers for leases on federal land in California. Under the Geothermal Program, the California Energy related to geothermal energy. The purpose of the program is to enhance and promote geothermal

  2. Large Energy Development Projects: Lessons Learned from Space and Politics

    SciTech Connect (OSTI)

    Schmitt, Harrison H. [University of Wisconsin-Madison (United States)

    2005-04-15T23:59:59.000Z

    The challenge to global energy future lies in meeting the needs and aspirations of the ten to twelve billion earthlings that will be on this planet by 2050. At least an eight-fold increase in annual production will be required by the middle of this century. The energy sources that can be considered developed and 'in the box' for consideration as sources for major increases in supply over the next half century are fossil fuels, nuclear fission, and, to a lesser degree, various forms of direct and stored solar energy and conservation. None of these near-term sources of energy will provide an eight-fold or more increase in energy supply for various technical, environmental and political reasons.Only a few potential energy sources that fall 'out of the box' appear worthy of additional consideration as possible contributors to energy demand in 2050 and beyond. These particular candidates are deuterium-tritium fusion, space solar energy, and lunar helium-3 fusion. The primary advantage that lunar helium-3 fusion will have over other 'out of the box' energy sources in the pre-2050 timeframe is a clear path into the private capital markets. The development and demonstration of new energy sources will require several development paths, each of Apollo-like complexity and each with sub-paths of parallel development for critical functions and components.

  3. A comprehensive approach to the formulation of capital projects in developing countries : finance and implementation. Case study, Edendale, Kwazulu (housing)

    E-Print Network [OSTI]

    Davis, Trevor Paul

    1983-01-01T23:59:59.000Z

    This Thesis deals with capital project formulation in developing countries. The objective is to provide guidelines for the formulation of housing development projects, their implementation structures and financial plans ...

  4. Multi-project baselines for potential clean development mechanism projects in the electricity sector in South Africa

    SciTech Connect (OSTI)

    Winkler, H.; Spalding-Fecher, R.; Sathaye, J.; Price, L.

    2002-06-26T23:59:59.000Z

    The United Nations Framework Convention on Climate Change (UNFCCC) aims to reduce emissions of greenhouse gases (GHGs) in order to ''prevent dangerous anthropogenic interference with the climate system'' and promote sustainable development. The Kyoto Protocol, which was adopted in 1997 and appears likely to be ratified by 2002 despite the US withdrawing, aims to provide means to achieve this objective. The Clean Development Mechanism (CDM) is one of three ''flexibility mechanisms'' in the Protocol, the other two being Joint Implementation (JI) and Emissions Trading (ET). These mechanisms allow flexibility for Annex I Parties (industrialized countries) to achieve reductions by extra-territorial as well as domestic activities. The underlying concept is that trade and transfer of credits will allow emissions reductions at least cost. Since the atmosphere is a global, well-mixed system, it does not matter where greenhouse gas emissions are reduced. The CDM allows Annex I Parties to meet part of their emissions reductions targets by investing in developing countries. CDM projects must also meet the sustainable development objectives of the developing country. Further criteria are that Parties must participate voluntarily, that emissions reductions are ''real, measurable and long-term'', and that they are additional to those that would have occurred anyway. The last requirement makes it essential to define an accurate baseline. The remaining parts of section 1 outline the theory of baselines, emphasizing the balance needed between environmental integrity and reducing transaction costs. Section 2 develops an approach to multi-project baseline for the South African electricity sector, comparing primarily to near future capacity, but also considering recent plants. Five potential CDM projects are briefly characterized in section 3, and compared to the baseline in section 4. Section 5 concludes with a discussion of options and choices for South Africa regarding electricity sector baselines.

  5. Multi-project baselines for potential clean development mechanism projects in the electricity sector in South Africa

    E-Print Network [OSTI]

    Winkler, H.; Spalding-Fecher, R.; Sathaye, J.; Price, L.

    2002-01-01T23:59:59.000Z

    projects in the electricity sector in South Africa. JournalMechanism projects in the electricity sector in South AfricaCDM projects in the electricity sector References UNFCCC,

  6. Framework for projecting employment and population changes accompanying energy development

    SciTech Connect (OSTI)

    Stenehjem, E.J.; Metzger, J.E.

    1980-05-01T23:59:59.000Z

    This report provides a framework which energy planners can use to readily estimate the size and timing of the population and employment changes associated with energy development. The direct employment requirements for eight different technologies are listed. This direct employment requirement can be combined with the set of employment multipliers and other information provided to obtain practical estimates of the employment and population impacts of new energy development. Some explanation is given for the variation of the multipliers among counties in the same region. A description is presented of a demographic model for deriving the annual population changes that can be expected as a result of in-migrating workers and their families. Several hypothetical examples of the procedure for making the calculations are discussed as practical exercises in using the multipliers. The necessary data are provided for obtaining estimates of population and employment changes in any county in the US.

  7. Advanced Wind Turbine Program Next Generation Turbine Development Project: June 17, 1997--April 30, 2005

    SciTech Connect (OSTI)

    GE Wind Energy, LLC

    2006-05-01T23:59:59.000Z

    This document reports the technical results of the Next Generation Turbine Development Project conducted by GE Wind Energy LLC. This project is jointly funded by GE and the U.S. Department of Energy's National Renewable Energy Laboratory.The goal of this project is for DOE to assist the U.S. wind industry in exploring new concepts and applications of cutting-edge technology in pursuit of the specific objective of developing a wind turbine that can generate electricity at a levelized cost of energy of $0.025/kWh at sites with an average wind speed of 15 mph (at 10 m height).

  8. 51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

    Broader source: Energy.gov [DOE]

    51-Mile Hydroelectric Power Project Demonstration of new methodologies to reduce the LCOE for small, hydropower development

  9. Development of Facilities Master Plan and Laboratory Renovation Project

    SciTech Connect (OSTI)

    Andrea D. Fox

    2011-10-03T23:59:59.000Z

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the Schoolâ??s overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  10. Project Management Career Development Program | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you wantJoin us for| Department of EnergyAcquisitionDevelopment »

  11. New Mexico Renewable Energy Project Development and Finance Workshop Agenda

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015of 2005 attheMohammed Khan -DepartmentDepartment ofDevelopment100New Mexico

  12. USABC PHEV Battery Development Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and BatteryUS-EU-Japan Working Group onPHEV Battery Development

  13. DOE/AHAM advanced refrigerator technology development project

    SciTech Connect (OSTI)

    Vineyard, E.A.; Sand, J.R.; Rice, C.K.; Linkous, R.L.; Hardin, C.V.; Bohman, R.H.

    1997-03-01T23:59:59.000Z

    As part of the effort to improve residential energy efficiency and reduce greenhouse emissions from power plants, several design options were investigated for improving the energy efficiency of a conventionally designed domestic refrigerator-freezer. The program goal was to reduce the energy consumption of a 20-ft{sup 3} (570-L) top-mount refrigerator-freeze to 1.00 kWh/d, a 50% reduction from the 1993 National Appliance Energy Conservation Act (NAECA) standard. The options--such as improved cabinet and door insulation, a high-efficiency compressor, a low-wattage fan, a large counterflow evaporator, and adaptive defrost control--were incorporated into prototype refrigerator-freezer cabinets and refrigeration systems. The refrigerant HFC-134a was used as a replacement for CFC-12. The baseline energy performance of the production refrigerator-freezers, along with cabinet heat load and compressor calorimeter test results, were extensively documented to provide a firm basis for experimentally measured energy savings. The project consisted of three main phases: (1) an evaluation of energy-efficient design options using computer simulation models and experimental testing, (2) design and testing of an initial prototype unit, and (3) energy and economic analyses of a final prototype. The final prototype achieved an energy consumption level of 0.93 kWh/d--an improvement of 45% over the baseline unit and 54% over the 1993 NAECA standard for 20-fg{sup 3} (570-L) units. The manufacturer`s cost for those improvements was estimated at $134; assuming that cost is doubled for the consumer, it would take about 11.4 years to pay for the design changes. Since the payback period was thought to be unfeasible, a second, more cost-effective design was also tested. Its energy consumption level was 1.16 kWh/d, a 42% energy savings, at a manufacturer`s cost increase of $53. Again assuming a 100% markup, the payback for this unit would be 6.6 years.

  14. Pumped Storage Hydropower (Project Development Support)—Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development

    Broader source: Energy.gov [DOE]

    Pumped Storage Hydropower (Project Development Support)—Geotechnical Investigation and Value Stream Analysis for the Iowa Hill Pumped-Storage Development

  15. (Energy related business development grant project): Final technical progress report

    SciTech Connect (OSTI)

    Not Available

    1987-10-26T23:59:59.000Z

    CONSERVE, Inc., a private, not-for-profit organization, was launched in 1986 to provide energy conservation and weatherization services to low-income neighborhoods throughout New York City. Founded by three non-profit community development groups - Northern Manhattan Improvement Corporation, Operation Open City and the Coalition Management Training Company - CONSERVE, Inc., couples NYS Weatherization Assistance Program funds with privately leveraged dollars to achieve more thorough workscopes and higher energy savings in multi-family buildings housing low-income tenants. CONSERVE's services include: energy audit and workscope preparation, financial analysis and packaging and construction management. During its first year of operation, CONSERVE's primary goal was to test the feasibility of coordinating the services described above by making them available to owners of multi-family buildings and potential lenders. First-year findings proved conclusively CONSERVE's viability as an energy conservation resource for owners and tenants of low-income, multi-family buildings in New York City. Based on its accomplishments as well as its potential, the organization has received full funding for the 1987-88 fiscal year from the NYS Energy Office and the NYS Weatherization Assistance Program. This report documents the organization's activities over the last year.

  16. Risk Management for Web and Distributed Software Development Projects Ayad Ali Keshlaf

    E-Print Network [OSTI]

    Newcastle upon Tyne, University of

    Risk Management for Web and Distributed Software Development Projects Ayad Ali Keshlaf School and managed. In this paper we survey a number of software risk management approaches and identify weaknesses approach to measure and control web and distributed development risks. Keywords-software risk management

  17. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31T23:59:59.000Z

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  18. Carbon Mitigation The goal of this project is to identify and develop standards and

    E-Print Network [OSTI]

    Magee, Joseph W.

    Carbon Mitigation CERAMICS The goal of this project is to identify and develop standards and measurement methods currently needed by the energy industry to enable the development of cost efficient carbon of carbon mitigation approaches to stabilize the CO2 concentration while more sustainable energy

  19. Community Shared Solar: Utility,Private,andNonpro tProjectDevelopment

    E-Print Network [OSTI]

    Laboratory by Northwest Sustainable Energy for Economic Development, Keyes and Fox, Stoel Rives, Clean Energy Collective; Marc Romito, Tucson Electric Power; Ellen Lamiman, Energy Solutions GRAPHICA Guide to Community Shared Solar: Utility,Private,andNonpro tProjectDevelopment #12

  20. Final report for the protocol extensions for ATM Security Laboratory Directed Research and Development Project

    SciTech Connect (OSTI)

    Tarman, T.D.; Pierson, L.G.; Brenkosh, J.P. [and others

    1996-03-01T23:59:59.000Z

    This is the summary report for the Protocol Extensions for Asynchronous Transfer Mode project, funded under Sandia`s Laboratory Directed Research and Development program. During this one-year effort, techniques were examined for integrating security enhancements within standard ATM protocols, and mechanisms were developed to validate these techniques and to provide a basic set of ATM security assurances. Based on our experience during this project, recommendations were presented to the ATM Forum (a world-wide consortium of ATM product developers, service providers, and users) to assist with the development of security-related enhancements to their ATM specifications. As a result of this project, Sandia has taken a leading role in the formation of the ATM Forum`s Security Working Group, and has gained valuable alliances and leading-edge experience with emerging ATM security technologies and protocols.

  1. Large resource development projects as markets for passive solar technologies. Final report

    SciTech Connect (OSTI)

    Roze-Benson, R V

    1980-12-01T23:59:59.000Z

    A basic premise of this study is that large resource development projects provide a major market opportunity for passive solar manufactured buildings. The primary objectives of the work are to document selected resource development projects and identify their potential housing needs and development schedules, to contact resource industry representatives and assess some of the processes and motivations behind their involvement in housing decisions, and to provide passive solar manufactured buildings producers with results of these steps as early initial market intelligence. The intent is to identify not only the industries, location of their planned projects, and their likely worker housing needs, but also the individuals involved in making housing-related decisions. The 56 identified projects are located within 18 states and cover 11 types of resources. The report documents individual projects, provides protections of total worker-related housing needs, and presents overviews of resource development company involvement in the new construction market. In addition, the report profiles three organizations that expressed a strong interest in implementing the use of low-cost passive solar manufactured buildings in resource-development-related activities.

  2. Uranium-mill-tailings remedial-action project (UMTRAP) cover and liner technology development project

    SciTech Connect (OSTI)

    Hartley, J.N.; Gee, G.W.; Freeman, H.D.; Cline, J.F.; Beedlow, P.A.; Buelt, J.L.; Relyea, J.R.; Tamura, T.

    1982-01-01T23:59:59.000Z

    Cover and liner systems for uranium mill tailings in the United States must satisfy stringent requirements regarding long-term stability, radon control, and radionuclide and hazardous chemical migration. The cover placed over a tailings pile serves three basic purposes: (1) to reduce the release of radon, (2) to prevent the intrusion of plant roots and burrowing animals into the tailings, and (3) to limit surface erosion. The liner placed under a tailings pile prevents the migration of radionuclides and hazardous chemicals to groundwater. Pacific Northwest Laboratory is developing and evaluating cover and liner systems that meet these objectives and conform to federal standards. The cover and liner technology discussed in this paper involves: (1) single and multilayer earthen cover systems, (2) asphalt emulsion radon barrier systems, (3) biobarrier systems, (4) revegetation and rock covers, and (5) asphalt, clay, and synthetic liner systems. These systems have been tested at the Grand Junction, Colorado, tailings pile, where they have been shown to effectively reduce radon releases and radionuclide and chemical migration.

  3. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    SciTech Connect (OSTI)

    JARAYSI, M.N.

    2007-01-08T23:59:59.000Z

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  4. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    SciTech Connect (OSTI)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30T23:59:59.000Z

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  5. PNL vitrification technology development project glass formulation strategy for LLW vitrification

    SciTech Connect (OSTI)

    Kim, D.; Hrma, P.R.; Westsik, J.H. Jr.

    1996-03-01T23:59:59.000Z

    This Glass Formulation Strategy describes development approaches to optimize glass compositions for Hanford`s low-level waste vitrification between now and the projected low-level waste facility start-up in 2005. The objectives of the glass formulation task are to develop optimized glass compositions with satisfactory long-term durability, acceptable processing characteristics, adequate flexibility to handle waste variations, maximize waste loading to practical limits, and to develop methodology to respond to further waste variations.

  6. Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation

    SciTech Connect (OSTI)

    Lantz, E.; Tegen, S.

    2009-01-01T23:59:59.000Z

    Community wind projects have long been touted (both anecdotally and in the literature) to increase the economic development impacts of wind projects, but most analyses of community wind have been based on expected results from hypothetical projects. This report provides a review of previous economic development analyses of community wind projects and compares these projected results with empirical impacts from projects currently in operation. A review of existing literature reveals two primary conclusions. First, construction-period impacts are often thought to be comparable for both community-and absentee-owned facilities. Second, operations-period economic impacts are observed to be greater for community-owned projects. The majority of studies indicate that the range of increased operations-period impact is on the order of 1.5 to 3.4 times. New retrospective analysis of operating community wind projects finds that total employment impacts from completed community wind projects are estimated to be on the order of four to six 1-year jobs per-MW during construction and 0.3 to 0.6 long-term jobs per-MW during operations. In addition, when comparing retrospective results of community wind to hypothetical average absentee projects, construction-period employment impacts are 1.1 to 1.3 times higher and operations-period impacts are 1.1 to 2.8 times higher for community wind. Comparing the average of the completed community wind projects studied here with retrospective analysis of the first 1,000 MW of wind in Colorado and Iowa indicates that construction-period impacts are as much as 3.1 times higher for community wind, and operations-period impacts are as much as 1.8 times higher. Ultimately, wind projects are a source of jobs and economic development, and community wind projects are shown to have increased impact both during the construction and operations-period of a wind power plant. The extent of increased impact is primarily a function of local ownership and return on investment. As such, policies that prioritize higher levels of local ownership are likely to result in increased economic development impacts. Furthermore, the increased economic development impact of community wind shown here should not be undervalued. As the wind industry grows and approaches penetrations in the U.S. electricity market of 20%, social opposition to new wind power projects may increase. Community wind could provide a valuable strategy for building community support of wind power - especially in communities that are new to wind power. This analysis finds that total employment impacts from completed community wind projects are on the order of four to six 1-year jobs per-MW during construction and 0.3 to 0.6 long-term jobs per-MW during operations. Furthermore, when comparing community wind to hypothetical average absentee projects, construction-period employment impacts are 1.1 to 1.3 times higher and operations-period impacts are 1.1 to 2.8 times higher for community wind. Comparing the average of the completed projects studied here with retrospective analysis of the first 1,000 MW of wind in Colorado and Iowa shows construction-period impacts are as much as 3.1 times higher for community wind, and operations-period impacts are as much as 1.8 times higher. As the wind industry has grown, community wind has largely been a peripheral development model. However, this analysis shows that wind projects are a source of jobs and economic development, and that community wind projects have greater economic development impacts than absentee-owned projects. As such, policies that prioritize higher levels of local ownership are likely to result in increased economic development impacts. While the magnitude of increased benefit is primarily a function of local ownership and project profitability, the increased economic development impact of all community wind projects should not be undervalued. The ability of community wind projects to disperse economic impacts within the states and communities where they are built and to engage local community members

  7. CO2 CAPTURE PROJECT - AN INTEGRATED, COLLABORATIVE TECHNOLOGY DEVELOPMENT PROJECT FOR NEXT GENERATION CO2 SEPARATION, CAPTURE AND GEOLOGIC SEQUESTRATION

    SciTech Connect (OSTI)

    Dr. Helen Kerr

    2003-08-01T23:59:59.000Z

    The CO{sub 2} Capture Project (CCP) is a joint industry project, funded by eight energy companies (BP, ChevronTexaco, EnCana, Eni, Norsk Hydro, Shell, Statoil, and Suncor) and three government agencies (1) European Union (DG Res & DG Tren), (2) Norway (Klimatek) and (3) the U.S.A. (Department of Energy). The project objective is to develop new technologies, which could reduce the cost of CO{sub 2} capture and geologic storage by 50% for retrofit to existing plants and 75% for new-build plants. Technologies are to be developed to ''proof of concept'' stage by the end of 2003. The project budget is approximately $24 million over 3 years and the work program is divided into eight major activity areas: (1) Baseline Design and Cost Estimation--defined the uncontrolled emissions from each facility and estimate the cost of abatement in $/tonne CO{sub 2}. (2) Capture Technology, Post Combustion: technologies, which can remove CO{sub 2} from exhaust gases after combustion. (3) Capture Technology, Oxyfuel: where oxygen is separated from the air and then burned with hydrocarbons to produce an exhaust with high CO{sub 2} for storage. (4) Capture Technology, Pre -Combustion: in which, natural gas and petroleum coke are converted to hydrogen and CO{sub 2} in a reformer/gasifier. (5) Common Economic Model/Technology Screening: analysis and evaluation of each technology applied to the scenarios to provide meaningful and consistent comparison. (6) New Technology Cost Estimation: on a consistent basis with the baseline above, to demonstrate cost reductions. (7) Geologic Storage, Monitoring and Verification (SMV): providing assurance that CO{sub 2} can be safely stored in geologic formations over the long term. (8) Non-Technical: project management, communication of results and a review of current policies and incentives governing CO{sub 2} capture and storage. Technology development work dominated the past six months of the project. Numerous studies are making substantial progress towards their goals. Some technologies are emerging as preferred over others. Pre-combustion Decarbonization (hydrogen fuel) technologies are showing good progress and may be able to meet the CCP's aggressive cost reduction targets for new-build plants. Chemical looping to produce oxygen for oxyfuel combustion shows real promise. As expected, post-combustion technologies are emerging as higher cost options that may have niche roles. Storage, measurement, and verification studies are moving rapidly forward. Hyper-spectral geo-botanical measurements may be an inexpensive and non-intrusive method for long-term monitoring. Modeling studies suggest that primary leakage routes from CO{sub 2} storage sites may be along wellbores in areas disturbed by earlier oil and gas operations. This is good news because old wells are usually mapped and can be repaired during the site preparation process. Many studies are nearing completion or have been completed. Their preliminary results are summarized in the attached report and presented in detail in the attached appendices.

  8. Hydrogen Storage The goal of this project is to develop the metrologies necessary

    E-Print Network [OSTI]

    Hydrogen Storage METALS The goal of this project is to develop the metrologies necessary for rapid, high-throughput measurement of the hydrogen content of novel materials proposed for hydrogen storage to the research community. Objective Impact and Customers · Hydrogen is promoted as a petroleum replacement

  9. draft 3/13/14 Session 6: Integrated Product Development and Project Management

    E-Print Network [OSTI]

    Martin, Gail

    D, Senior Vice President, Project Management, Endo 8:35 am 60 Decision Analysis Tools and Techniques Patricia Evans, PhD, Independent Consultant 9:35 am 50 Product Development Decision Making John Celona, JD:50 pm 45 Case Study 12: Balancing Risk and Return in Portfolio Management Patricia Evans, Ph

  10. The Mentor-lite prototype has been developed within the research project "Architecture, Configuration, and

    E-Print Network [OSTI]

    Abstract The Mentor-lite prototype has been developed within the research project "Architecture (DFG). In this paper, we present the architecture of Mentor-lite and our approach towards customizability. The demo will show the feasibility of the presented approach. 1 System Overview The Mentor

  11. Cyberinfrastructure Development for the Western Consortium of Idaho, Nevada, and New Mexico Project Summary

    E-Print Network [OSTI]

    Walden, Von P.

    Cyberinfrastructure Development for the Western Consortium of Idaho, Nevada, and New Mexico Project, and New Mexico independently submitted NSF EPSCoR Track 1 Research Infrastructure Improvement (RII monitoring tools across the state. New Mexico: New Mexico activities will enhance connectivity to academic

  12. Short-term Forecasting of Offshore Wind Farm Production Developments of the Anemos Project

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Short-term Forecasting of Offshore Wind Farm Production ­ Developments of the Anemos Project J to the large dimensions of offshore wind farms, their electricity production must be known well in advance networks) models were calibrated on power data from two offshore wind farms: Tunoe and Middelgrunden

  13. ISO launches a project committee to develop an International Standard for energy management

    Broader source: Energy.gov [DOE]

    American National Standards Institute (ANSI) approved the formation of a U.S. Technical Advisory Group (US TAG) to the ISO Project Committee 242. The TAG is a mechanism for identifying issues and developing national consensus regarding energy management. Read this announcement for more details about the group's charge and how to participate.

  14. Developing Grid-based Systems for Microbial Genome Comparisons: The Microbase Project

    E-Print Network [OSTI]

    Newcastle upon Tyne, University of

    Developing Grid-based Systems for Microbial Genome Comparisons: The Microbase Project Anil Wipat, University of Newcastle upon Tyne Abstract Comparative analysis of genomes allows the rich source of biological genome sequence data to be most efficiently exploited. However, the rate at which microbial

  15. Developing Data Management Policy and Guidance Documents for your NARSTO Program or Project

    E-Print Network [OSTI]

    by the NARSTO Quality Systems Science Center (QSSC) http://cdiac.ornl.gov/programs/NARSTO/ Les A. Hook and Sigurd W. Christensen, NARSTO Quality Systems Science Center Environmental Sciences Division Oak RidgeDeveloping Data Management Policy and Guidance Documents for your NARSTO Program or Project

  16. Research and development activities in support of Hanford River protection project privatization -- SRTC program

    SciTech Connect (OSTI)

    Sturm, H.

    2000-01-11T23:59:59.000Z

    A team led by BNFL was awarded the contract to remediate and immobilize the Hanford radioactive tank waste in support of the Hanford River Protection Program. BNFL and team members will develop and design integrated facilities for pretreatment and vitrification in support of this program. This facility will pretreat and immobilize approximately 0.375 MT/day of high level waste and approximately 4.5 MT/day of low activity waste. As part of the overall project, BNFL has contracted Savannah River Technology Center (SRTC) to provide research and development services in characterization, pretreatment, and immobilization of actual Hanford tank wastes. SRTC is conducting tests, radioactive and non-radioactive, to confirm all major processing steps for the pretreatment flowsheet. During this testing, SRTC has identified and developed alternate or additional processing steps to address significant processing concerns. Additionally, SRTC is developing design basis data using simulants of Hanford tank wastes in areas of ion exchange, filtration, precipitation, glass former blending, evaporation, and slurry mixing. This paper will provide an overview of SRTC activities completed during the initial phase of the project, flowsheet modifications resulting from SRTC's identification and development of alternate or modified processing steps, as well as a description of the SRTC development program for the next phase of the project.

  17. UBC Social Ecological Economic Development Studies (SEEDS) Student Report The Sustainability of UBC Food System Collaborative Project II

    E-Print Network [OSTI]

    UBC Social Ecological Economic Development Studies (SEEDS) Student Report The Sustainability of UBC, indicators were developed to assess the sustainability of the food system. Furthermore, we developed of a project/report". #12;The Sustainability of UBC Food System Collaborative Project II Group Three

  18. Role of Renewable Energy Certificates in Developing New Renewable Energy Projects

    SciTech Connect (OSTI)

    Holt, E.; Sumner, J.; Bird, L.

    2011-06-01T23:59:59.000Z

    For more than a decade, renewable energy certificates (RECs) have grown in use, becoming a common way to track ownership of the renewable and environmental attributes of renewable electricity generation. In recent years, however, questions have risen about the role RECs play in the decision to build new renewable energy projects. Information from a variety of market participants suggests that the importance of RECs in building new projects varies depending on a number of factors, including electricity market prices, the cost-competitiveness of the project, the presence or absence of public policies supportive of new projects, contract duration, and the perspective of different market participants. While there is no single answer to the role that RECs play, there are situations in which REC revenues are essential to project economics, as well as some where REC revenues may have little impact. To strengthen the role RECs play in both compliance and voluntary markets, there are a number of options that could be considered. In compliance markets, lawmakers or regulators would have to adopt measures that strengthen the role of RECs in the development of new projects, while in voluntary markets, it would be up to program leaders and market participants themselves to implement measures.

  19. The project RTPPP (Development of a realtime PPP processing facility) is planned to be a followup project of RAPPP (Innovative Algorithms for Rapid Precise Point Positioning),

    E-Print Network [OSTI]

    Schuh, Harald

    RTPPP The project RTPPP (Development of a realtime PPP processing facility) is planned and evaluation of enhanced algorithms for PPP (Precise Point Positioning) to improve the technique with respect RAPPP, the proposed project RTPPP concentrates on the possibilities of the PPP technique within a real

  20. Final Technical Report for the Martin County Hydrogen Fuel Cell Development Project

    SciTech Connect (OSTI)

    Eshraghi, Ray

    2011-03-09T23:59:59.000Z

    In September 2008, the U.S. Department of Energy and Martin County Economic Development Corporation entered into an agreement to further the advancement of a microtubular PEM fuel cell developed by Microcell Corporation. The overall focus of this project was on research and development related to high volume manufacturing of fuel cells and cost reduction in the fuel cell manufacturing process. The extrusion process used for the microfiber fuel cells in this project is inherently a low cost, high volume, high speed manufacturing process. In order to take advantage of the capabilities that the extrusion process provides, all subsequent manufacturing processes must be enhanced to meet the extrusion line’s speed and output. Significant research and development was completed on these subsequent processes to ensure that power output and performance were not negatively impacted by the higher speeds, design changes and process improvements developed in this project. All tasks were successfully completed resulting in cost reductions, performance improvements and process enhancements in the areas of speed and quality. These results support the Department of Energy’s goal of fuel cell commercialization.

  1. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect (OSTI)

    Gasper, John R. [Argonne National Laboratory] [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory] [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory] [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory] [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory] [Argonne National Laboratory; Wigmosta, Mark S. [PNNL] [PNNL; Voisin, Nathalie [PNNL] [PNNL; Rakowski, Cynthia [PNNL] [PNNL; Coleman, Andre [PNNL] [PNNL; Lowry, Thomas S. [SNL] [SNL

    2014-05-19T23:59:59.000Z

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  2. Integrated Biorefinery Project: Cooperative Research and Development Final Report, CRADA Number CRD-10-390

    SciTech Connect (OSTI)

    Chapeaux, A.; Schell, D.

    2013-06-01T23:59:59.000Z

    The Amyris-NREL CRADA is a sub-project of Amyris?s DOE-funded pilot-scale Integrated Biorefinery (IBR). The primary product of the Amyris IBR is Amyris Renewable Diesel. Secondary products will include lubricants, polymers and other petro-chemical substitutes. Amyris and its project partners will execute on a rapid project to integrate and leverage their collective expertise to enable the conversion of high-impact biomass feedstocks to these advanced, infrastructure-compatible products. The scope of the Amyris-NREL CRADA includes the laboratory development and pilot scale-up of bagasse pretreatment and enzymatic saccharification conditions by NREL for subsequent conversion of lignocellulosic sugar streams to Amyris Diesel and chemical products by Amyris. The CRADA scope also includes a techno-economic analysis of the overall production process of Amyris products from high-impact biomass feedstocks.

  3. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    SciTech Connect (OSTI)

    Craig W. Collar

    2012-11-16T23:59:59.000Z

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy�s Wind and Hydropower Technologies Program�s goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

  4. Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation; Preprint

    SciTech Connect (OSTI)

    Lantz, E.; Tegen, S.

    2009-04-01T23:59:59.000Z

    'Community wind' refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an 'absentee' project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  5. Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project

    SciTech Connect (OSTI)

    Dodds, K.; Daley, T.; Freifeld, B.; Urosevic, M.; Kepic, A.; Sharma, S.

    2009-05-01T23:59:59.000Z

    The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

  6. A Study of the Economic Impact of Water Impoundment Through the Development of a Comparative-Projection Model

    E-Print Network [OSTI]

    Pearson, J.E.

    Using two established reservoir projects, an economic simulation model for reservoir development was constructed. The two comparative areas used for the model development are both reservoirs in central Texas and were constructed during approximately...

  7. UBC Social Ecological Economic Development Studies (SEEDS) Student Report The Sustainability Of The Ubc Food System: Collaborative Project II

    E-Print Network [OSTI]

    UBC Social Ecological Economic Development Studies (SEEDS) Student Report The Sustainability asked to develop a model to assess the sustainability of the UBC Food System. Specifically, we have to of a project/report". #12;1 THE SUSTAINABILITY OF THE UBC FOOD SYSTEM: COLLABORATIVE PROJECT II Agricultural

  8. Cummins Engine Company B5.9 Propane Engine Development, Certification, and Demonstration Project

    SciTech Connect (OSTI)

    The ADEPT Group, Inc. (Los Angeles, California)

    1998-12-18T23:59:59.000Z

    The objective of this project was to successfuly develop and certify an LPG-dedicated medium-duty original equipment manufacturer (OEM) engine that could be put into production. The engine was launched into production in 1994, and more than 800 B5.9G engines are now in service in the United States and abroad. This engine is now offered by more than 30 bus and truck OEMs.

  9. Advanced Gas Turbine (AGT) technology development project. Annual report, July 1984-June 1985

    SciTech Connect (OSTI)

    Not Available

    1986-07-01T23:59:59.000Z

    This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company.

  10. Developing governmental decision strategies for determining involvement in highly uncertain, large-scale capital investment projects

    E-Print Network [OSTI]

    Golden, Robert J

    1978-01-01T23:59:59.000Z

    to the project. Finally, in order to test the model's applicability in assisting governmental decision-makers to rationally allocate resources, the model has been empirically tested by a Westinghouse proposal (concerning offshore floating nuclear power... . Classification of Models . Models as a Frame of Reference The Contextual Matrix Development of the Matrix Model Methodology Exmployed to Utilize ~ ~ ~ ~ the 27 29 30 32 33 Matrix Framework . IV. WESTINGHOUSE'S OFFSHORE FLOATING NUCLEAR POWER PLANT...

  11. An Economic Analysis of the Kilauea Geothermal Development and Inter-Island Cable Project

    SciTech Connect (OSTI)

    None

    1990-03-01T23:59:59.000Z

    A study by NEA completed in April 1987 shows that a large scale (500 MW) geothermal development on the big island of Hawaii and the inter-island power transmission cable is economically infeasible. This updated report, utilizing additional information available since 1987, reaches the same conclusion: (1) The state estimate of $1.7 billion for development cost of the geothermal project is low and extremely optimistic. more realistic development costs are shown to be in the range of $3.4 to $4.3 billion and could go as high as $4.6 billion. (2) Compared to alternative sources of power generation, geothermal can be 1.7 to 2.4 times as costly as oil, and 1.2 to 1.7 times as costly as a solar/oil generating system. (3) yearly operation and maintenance costs for the large scale geothermal project are estimated to be 44.7 million, 72% greater than a solar/oil generating system. (4) Over a 40-year period ratepayers could pay, on average, between 1.3 (17.2%) and 2.4 cents (33%) per kWh per year more for electricity produced by geothermal than they are currently paying (even with oil prices stabilizing at $45 per barrel in 2010). (5) A comparable solar/oil thermal energy development project is technologically feasible, could be island specific, and would cost 20% to 40% less than the proposed geothermal development. (6) Conservation is the cheapest alternative of all, can significantly reduce demand, and provides the greatest return to ratepayers. There are better options than geothermal. Before the State commits the people of Hawaii to future indebtedness and unnecessary electricity rate increases, more specific study should be conducted on the economic feasibility, timing, and magnitude of the geothermal project. The California experience at The Geyers points up the fact that it can be a very risky and disappointing proposition. The state should demand that proponents and developers provide specific answers to geothermals troubling questions before they make an irreversible commitment to it. The state should also more carefully assess the potential risks and hazards of volcanic disturbances, the degree of environmental damage that could occur, the future demand for electricity, and the potential of supplying electricity from alternative energy sources, conservation and small scale power units. As they stated in the April 1987 study, to move ahead with rapid large scale geothermal development on Hawaii without thoroughly studying these aspects of its development is ill-advised and economically unsound.

  12. Development of time projection chamber for precise neutron lifetime measurement using pulsed cold neutron beams

    E-Print Network [OSTI]

    Arimoto, Y; Igarashi, Y; Iwashita, Y; Ino, T; Katayama, R; Kitahara, R; Kitaguchi, M; Matsumura, H; Mishima, K; Oide, H; Otono, H; Sakakibara, R; Shima, T; Shimizu, H M; Sugino, T; Sumi, N; Sumino, H; Taketani, K; Tanaka, G; Tanaka, M; Tauchi, K; Toyoda, A; Yamada, T; Yamashita, S; Yokoyama, H; Yoshioka, T

    2015-01-01T23:59:59.000Z

    A new time projection chamber (TPC) was developed for neutron lifetime measurement using a pulsed cold neutron spallation source at the Japan Proton Accelerator Research Complex (J-PARC). Managing considerable background events from natural sources and the beam radioactivity is a challenging aspect of this measurement. To overcome this problem, the developed TPC has unprecedented features such as the use of polyether-ether-ketone plates in the support structure and internal surfaces covered with $^6$Li-enriched tiles to absorb outlier neutrons. In this paper, the design and performance of the new TPC are reported in detail.

  13. Development of time projection chamber for precise neutron lifetime measurement using pulsed cold neutron beams

    E-Print Network [OSTI]

    Y. Arimoto; N. Higashi; Y. Igarashi; Y. Iwashita; T. Ino; R. Katayama; R. Kitahara; M. Kitaguchi; H. Matsumura; K. Mishima; H. Oide; H. Otono; R. Sakakibara; T. Shima; H. M. Shimizu; T. Sugino; N. Sumi; H. Sumino; K. Taketani; G. Tanaka; M. Tanaka; K. Tauchi; A. Toyoda; T. Yamada; S. Yamashita; H. Yokoyama; T. Yoshioka

    2015-03-27T23:59:59.000Z

    A new time projection chamber (TPC) was developed for neutron lifetime measurement using a pulsed cold neutron spallation source at the Japan Proton Accelerator Research Complex (J-PARC). Managing considerable background events from natural sources and the beam radioactivity is a challenging aspect of this measurement. To overcome this problem, the developed TPC has unprecedented features such as the use of polyether-ether-ketone plates in the support structure and internal surfaces covered with $^6$Li-enriched tiles to absorb outlier neutrons. In this paper, the design and performance of the new TPC are reported in detail.

  14. Greenhouse Emission Reductions and Natural Gas Vehicles: A Resource Guide on Technology Options and Project Development

    SciTech Connect (OSTI)

    Orestes Anastasia; NAncy Checklick; Vivianne Couts; Julie Doherty; Jette Findsen; Laura Gehlin; Josh Radoff

    2002-09-01T23:59:59.000Z

    Accurate and verifiable emission reductions are a function of the degree of transparency and stringency of the protocols employed in documenting project- or program-associated emissions reductions. The purpose of this guide is to provide a background for law and policy makers, urban planners, and project developers working with the many Greenhouse Gas (GHG) emission reduction programs throughout the world to quantify and/or evaluate the GHG impacts of Natural Gas Vehicle (NGVs). In order to evaluate the GHG benefits and/or penalties of NGV projects, it is necessary to first gain a fundamental understanding of the technology employed and the operating characteristics of these vehicles, especially with regard to the manner in which they compare to similar conventional gasoline or diesel vehicles. Therefore, the first two sections of this paper explain the basic technology and functionality of NGVs, but focus on evaluating the models that are currently on the market with their similar conventional counterparts, including characteristics such as cost, performance, efficiency, environmental attributes, and range. Since the increased use of NGVs, along with Alternative Fuel Vehicle (AFVs) in general, represents a public good with many social benefits at the local, national, and global levels, NGVs often receive significant attention in the form of legislative and programmatic support. Some states mandate the use of NGVs, while others provide financial incentives to promote their procurement and use. Furthermore, Federal legislation in the form of tax incentives or procurement requirements can have a significant impact on the NGV market. In order to implement effective legislation or programs, it is vital to have an understanding of the different programs and activities that already exist so that a new project focusing on GHG emission reduction can successfully interact with and build on the experience and lessons learned of those that preceded it. Finally, most programs that deal with passenger vehicles--and with transportation in general--do not address the climate change component explicitly, and thus there are few GHG reduction goals that are included in these programs. Furthermore, there are relatively few protocols that exist for accounting for the GHG emissions reductions that arise from transportation and, specifically, passenger vehicle projects and programs. These accounting procedures and principles gain increased importance when a project developer wishes to document in a credible manner, the GHG reductions that are achieved by a given project or program. Section four of this paper outlined the GHG emissions associated with NGVs, both upstream and downstream, and section five illustrated the methodology, via hypothetical case studies, for measuring these reductions using different types of baselines. Unlike stationary energy combustion, GHG emissions from transportation activities, including NGV projects, come from dispersed sources creating a need for different methodologies for assessing GHG impacts. This resource guide has outlined the necessary context and background for those parties wishing to evaluate projects and develop programs, policies, projects, and legislation aimed at the promotion of NGVs for GHG emission reduction.

  15. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    SciTech Connect (OSTI)

    Rink, N. [comp.

    1997-03-01T23:59:59.000Z

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  16. Advanced emissions control development project. Phase I, Final report, November 1, 1993--February 19, 1996

    SciTech Connect (OSTI)

    NONE

    1996-02-29T23:59:59.000Z

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. Ideally, the project aim is to effectively control air toxic emissions through the use of conventional flue gas cleanup equipment such as electrostatic precipitators (ESP`s), fabric filters (baghouse), and wet flue gas desulfurization. B&W`s Clean Environment Development Facility (CEDF) and the AECDP equipment combined to form a state-of-the-art facility for integrated evaluation of combustion and post-combustion emissions control options. Phase 1 activities were primarily aimed at providing a reliable, representative test facility for conducting air toxic emissions control development work later in the project. This report summarizes the AECDP Phase I activities which consisted of the design, installation, shakedown, verification, and air toxics benchmarking of the AECDP facility. All verification and air toxic tests were conducted with a high sulfur, bituminous Ohio coal.

  17. RADIOLOGICAL SURVEY STATION DEVELOPMENT FOR THE PIT DISASSEMBLY AND CONVERSION PROJECT

    SciTech Connect (OSTI)

    Dalmaso, M.; Gibbs, K.; Gregory, D.

    2011-05-22T23:59:59.000Z

    The Savannah River National Laboratory (SRNL) has developed prototype equipment to demonstrate remote surveying of Inner and Outer DOE Standard 3013 containers for fixed and transferable contamination in accordance with DOE Standard 3013 and 10 CFR 835 Appendix B. When fully developed the equipment will be part of a larger suite of equipment used to package material in accordance with DOE Standard 3013 at the Pit Disassembly and Conversion Project slated for installation at the Savannah River Site. The prototype system consists of a small six-axis industrial robot with an end effector consisting of a force sensor, vacuum gripper and a three fingered pneumatic gripper. The work cell also contains two alpha survey instruments, swipes, swipe dispenser, and other ancillary equipment. An external controller interfaces with the robot controller, survey instruments and other ancillary equipment to control the overall process. SRNL is developing automated equipment for the Pit Disassembly and Conversion (PDC) Project that is slated for the Savannah River Site (SRS). The equipment being developed is automated packaging equipment for packaging plutonium bearing materials in accordance with DOE-STD-3013-2004. The subject of this paper is the development of a prototype Radiological Survey Station (RSS). Other automated equipment being developed for the PDC includes the Bagless transfer System, Outer Can Welder, Gantry Robot System (GRS) and Leak Test Station. The purpose of the RSS is to perform a frisk and swipe of the DOE Standard 3013 Container (either inner can or outer can) to check for fixed and transferable contamination. This is required to verify that the contamination levels are within the limits specified in DOE-STD-3013-2004 and 10 CFR 835, Appendix D. The surface contamination limit for the 3013 Outer Can (OC) is 500 dpm/100 cm2 (total) and 20 dpm/100 cm2 (transferable). This paper will concentrate on the RSS developments for the 3013 OC but the system for the 3013 Inner Can (IC) is nearly identical.

  18. 100kW Energy Transfer Multiplexer Power Converter Prototype Development Project

    SciTech Connect (OSTI)

    S. Merrill Skeist; Richard H. (Dick) Baker; Anthony G.P. Marini; DOE Project Officer - Keith Bennett

    2006-03-21T23:59:59.000Z

    Project Final Report for "100kW Energy Transfer Multiplexer Power Converter Prototype Development Project" prepared under DOE grant number DE-FG36-03GO13138. This project relates to the further development and prototype construction/evaluation for the Energy Transfer Multiplexer (ETM) power converter topology concept. The ETM uses a series resonant link to transfer energy from any phase of a multiphase input to any phase of a multiphase output, converting any input voltage and frequency to any output voltage and frequency. The basic form of the ETM converter consists of an eight (8)-switch matrix (six phase power switches and two ground power switches) and a series L-C resonant circuit. Electronic control of the switches allows energy to be transferred in the proper amount from any phase to any other phase. Depending upon the final circuit application, the switches may be either SCRs or IGBTs. The inherent characteristics of the ETM converter include the following: Power processing in either direction (bidirectional); Large voltage gain without the need of low frequency magnetics; High efficiency independent of output load and frequency; Wide bandwidth with fast transient response and; Operation as a current source. The ETM is able to synthesize true sinusoidal waveforms with low harmonic distortions. For a low power PM wind generation system, the ETM has the following characteristics and advantages: It provides voltage gain without the need of low frequency magnetics (DC inductors) and; It has constant high efficiency independent of the load. The ETM converter can be implemented into a PM wind power system with smaller size, reduced weight and lower cost. As a result of our analyses, the ETM offers wind power generation technology for the reduction of the cost and size as well as the increase in performance of low power, low wind speed power generation. This project is the further theoretical/analytical exploration of the ETM converter concept in relationship to PM wind power generator applications in the 100kW and under power range. The theoretical/analytical and bench scale work focuses on simplifying the basic ETM converter topology (in terms of parts count and complexity) for the specific application of the low power PM system. The project goals and objectives were for Spellman HV will develop a 100kW prototype ETM power converter based on paralleled lower ratings converters. The proposed configuration of this prototype is a 100kW rated converter comprised of four (4) 34kW rated modules connected in parallel (the fourth converter is included to demonstrate N+1 fault tolerance). This approach is more viable as there is lower technological risk involved in developing a 34kW-rated converter than a single 100kW unit. The modular system approach should have a lower deployment and service cost over a single unit system, because of the economics of scale (smaller units at a higher volume means lower manufacturing cost) and because of improved serviceability (a non-redundant power system with one failed module will still operate at a lower power level). There is also the added benefit that greater commercial application and acceptance should be achieved by having a modular system available in which fault tolerance (N+1 or 2N) is a feature. This modular approach would allow the output power to be increased by adding more paralleled converters. Thus, the maximum output power of the overall power system is a function of the interconnection medium (the hot swap connection subsystem), rather than the ratings of a single module. The project was implemented with Spellman HV acting as the program management and production assembly and test facility; The Baker Company acting as a technical consultant and resource when required; and dtm Associates acting as the design/development resource for the hardware development of the 100kW ETM converter prototype.

  19. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    SciTech Connect (OSTI)

    Rink, N.A. [comp.

    1997-08-01T23:59:59.000Z

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.

  20. RECENT DEVELOPMENTS OF THE IRIS PROJECT OF INTEREST FOR LATIN AMERICA

    SciTech Connect (OSTI)

    Carelli, M.D.; Petrovic, B.

    2004-10-03T23:59:59.000Z

    The IRIS (International Reactor Innovative and Secure) reactor design is being developed by an international consortium of 21 organizations from ten countries, including three members from Brazil and one from Mexico. This reflects the interest that Latin America has for a project which addresses the energy needs of the region. Presented here are some of the most recent developments in the IRIS project. The project's highest priority is the current pre-application licensing with the US NRC, which has required an investigation of the major accident sequences and a preliminary probabilistic risk assessment (PRA). The results of the accident analyses confirmed the outstanding inherent safety of the IRIS configuration and the PRA analyses indicated a core damage frequency due to internal events of the order of 2E-8. This not only highlights the enhanced safety characteristic of IRIS which should enhance its public acceptance, but it has also prompted IRIS to consider the possibility of being licensed without the need for off-site emergency response planning which would have a very positive economic implication. The modular IRIS, with each module rated at {approx} 335 MWe, is of course an ideal size for developing countries as it allows to easily introduce a moderate amount of power on limited electric grids. IRIS can be deployed in single modules in regions only requiring a few hundred MWs or in multiple modules deployed successively at time intervals in large urban areas requiring a larger amount of power increasing with time. IRIS is designed to operate ''hands-off'' as much as possible, with a small crew, having in mind deployment in areas with limited infrastructure. Thus IRIS has a 48-months maintenance interval, long refueling cycles in excess of three years, and is designed to increase as much as possible operational reliability. For example, the project has recently adopted internal control rod drive mechanisms to eliminate vessel head penetrations and the possibility of corrosion cracking as in Davis-Besse and other plants. Latin America, as many other regions on the earth, needs water as much as electricity. IRIS has developed a water desalination co-generation design which can employ a variety of processes as dictated by local and economic conditions. Applications to the arid Brazilian Nord-Este and Mexican Nord-Oeste are being considered.

  1. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    SciTech Connect (OSTI)

    Yamaguchi, N.D.; Breazeale, K. [ed.

    1993-12-01T23:59:59.000Z

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  2. Department of Mechanical Engineering/Material Science and Engineering Spring 2013 Project Name Development of Test Rig to

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Mechanical Engineering/Material Science and Engineering Spring 2013 Project Name ­ Development of Test Rig to Analyze Composite Materials for Pump Wear Rings Overview Flowserve up. The hardest part of this project was learning SolidWorks, how to incorporate mechanical design

  3. Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines

    SciTech Connect (OSTI)

    Not Available

    1992-08-01T23:59:59.000Z

    This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

  4. Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines

    SciTech Connect (OSTI)

    Not Available

    1992-08-01T23:59:59.000Z

    This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

  5. 94-1 Research and Development Project Lead Laboratory Support. Status report, April 1, 1996--June 30, 1996

    SciTech Connect (OSTI)

    Dinehart, M. [comp.

    1996-10-01T23:59:59.000Z

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects concerned with the management of plutonium and plutonium contaminated materials during the third quarter of FY96.

  6. Fire fighting in aerospace product development : a study of project capacity and resource planning in an aerospace enterprise

    E-Print Network [OSTI]

    McQuarrie, Allan J. (Allan John), 1963-

    2003-01-01T23:59:59.000Z

    It is broadly recognized in the aerospace industry, as well as many others, that organizations which effectively execute development projects to meet desired cost, schedule, and performance targets for their customers ...

  7. A framework and methodology for enhancing operational requirements development : United States Coast Guard cutter project case study

    E-Print Network [OSTI]

    Schofield, Douglas M. (Douglas MacLean)

    2010-01-01T23:59:59.000Z

    Within any major United States Coast Guard cutter acquisition project, developing the operational requirements in the early phases of acquisition is difficult as the complexity of the system is not easily understood until ...

  8. Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development

    SciTech Connect (OSTI)

    Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

    1980-12-01T23:59:59.000Z

    A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

  9. CX-008215: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Small Hydropower Research and Development Technology Project CX(s) Applied: A9 Date: 04/03/2012 Location(s): Colorado Offices(s): Golden Field Office

  10. A Guide to Community Shared Solar: Utility, Private, and Non-Profit Project Development (Book)

    SciTech Connect (OSTI)

    Coughlin, J.; Grove, J.; Irvine, L.; Jacobs, J. F.; Johnson Phillips, S.; Sawyer, A.; Wiedman, J.

    2012-05-01T23:59:59.000Z

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  11. Applications of geographic information systems (GIS) in decision analysis for monitoring aquifer systems during oilfield development projects

    SciTech Connect (OSTI)

    Blundell, S.; Baldwin, D.O.; Anderson, N.J. [Integrated Geoscience, Inc., Helena, MT (United States)

    1996-06-01T23:59:59.000Z

    Geographic Information Systems (GIS) coupled with numerical ground water models provide a powerful Decision Support System (DSS) and visualization tool for monitoring aquifer systems during oilfield development projects. A GIS is a coupled software/hardware system that stores, processes, and displays a variety of data structures (raster, vector, TIN, CAD) that have been geographically referenced to some common map projection and coordinate system. Georeferencing allows the analyst to integrate diverse types of data layers into thematic maps for analysis of spatial trends and analyses. The integration of quasi 3-D numerical ground water models with GIS provides project managers with a Decision Support System (DSS) to assess potential impacts to aquifer systems during oilfield development projects. The rapid advancement in desktop PC computing power and data storage has allowed software developers to produce 32-bit GIS and data integration software applications. A variety of image processing, GIS, and numerical ground water modeling software will be used to demonstrate techniques for monitoring and visualizing the migration of an oilfield brine plume leaking during an oilfield development project. Emphasis will be placed on the integration of data structures and on database design to create a DSS within a desktop GIS to serve Project Managers during oilfield development.

  12. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect (OSTI)

    none,

    2014-02-27T23:59:59.000Z

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  13. Evaluating the use of Social Impact Assessment in the context of agricultural development projects in Iran

    SciTech Connect (OSTI)

    Ahmadvand, Mostafa, E-mail: ahmadvand_2000@yahoo.co [Faculty of Agriculture, Yasuj University, Yasuj (Iran, Islamic Republic of); Karami, Ezatollah, E-mail: ekarami@shirazu.ac.i [Department of Agricultural Extension and Education, College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of); Zamani, Gholam Hossein, E-mail: zamani@shirazu.ac.i [Department of Agricultural Extension and Education, College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of); Vanclay, Frank, E-mail: Frank.Vanclay@utas.edu.a [Tasmanian Institute of Agricultural Research, University of Tasmania, Hobart (Australia)

    2009-11-15T23:59:59.000Z

    The utilisation of Social Impact Assessment (SIA) in Iran is analysed in terms of its policy context and its application in practice. Five case studies where SIA was employed in conjunction with Environmental Impact Assessments (EIA) for agricultural development projects are evaluated. In addition, the performance of the policy context is assessed. This research revealed that there are legal and institutional constraints to the effective functioning of SIA in Iran, and that there are deficiencies in the operating guidelines. There were serious problems associated with the way SIA was undertaken in all five case studies. Recommendations to improve the policy framework for the conduct of SIA are made. The recommendations advocate for a higher profile of SIA within legislation, for social issues to have greater emphasis in official guidelines for the conduct of EIA and SIA, and for a range of measures to increase the professionalism of SIA practice.

  14. The early development of neutron diffraction: Science in the wings of the Manhattan Project

    SciTech Connect (OSTI)

    Mason, Thom [ORNL] [ORNL; Gawne, Timothy J [ORNL] [ORNL; Nagler, Stephen E [ORNL] [ORNL; Nestor, Margaret Boone {Bonnie} [ORNL; Carpenter, John M [ORNL] [ORNL

    2012-01-01T23:59:59.000Z

    Although neutron diffraction was first observed using radioactive decay sources shortly after the discovery of the neutron, it was only with the availability of higher intensity neutron beams from the first nuclear reactors, constructed as part of the Manhattan project, that systematic investigation of Bragg scattering became possible. Remarkably, at a time when the war effort was singularly focused on the development of the atomic bomb, groups working at Oak Ridge and Chicago carried out key measurements and recognized the future utility of neutron diffraction quite independent of its contributions to the measurements of nuclear cross sections. Ernest O. Wollan, Lyle B. Borst, and Walter H. Zinn were all able to observe neutron diffraction in 1944 using the X-10 graphite reactor and the CP-3 heavy water reactor.

  15. 94-1 Research and Development Project lead laboratory support: Fiscal year 1997. Progress report

    SciTech Connect (OSTI)

    McKee, S.D. [comp.

    1996-12-01T23:59:59.000Z

    On May 26, 1994, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 94-1, which expressed the board`s concern about nuclear materials left in the manufacturing pipeline after the US halted its nuclear weapons production activities. The DNFSB emphasized the need for remediation of these materials. As part of Recommendation 94-1, the DNFSB defined research objectives as follows: that a research program be established to fill any gaps in the information base needed for choosing among the alternate processes to be used in safe conversion of various types of fissile materials to optimal forms for safe interim storage and the longer-term disposition. To achieve this objective a research and technology development program with two elements is needed: a technology-specific program that is focused on treating and storing materials safety, with concomitant development of storage criteria and surveillance requirements, centered around 3- and 8-year targets; and a core technology program to augment the knowledge base about general chemical and physical processing and storage behavior and to assure safe interim material storage until disposition policies are formulated. The paper reports the progress on the following: materials identification and surveillance; stabilization process development; surveillance and monitoring; core technologies; and project management.

  16. Development of a special nuclear materials monitoring sensor pack for Project Straight-Line

    SciTech Connect (OSTI)

    Daily, M.R.; Moreno, D.J.; Tolk, K.M.; Wilcoxen, J.L. [Sandia National Labs., Albuquerque, NM (United States); Oetken, R.E.; Collins, J.E.; Miller, R.; Olsen, R.W. [Sandia National Labs., Livermore, CA (United States); Sheets, L. [Allied-Signal, Kansas City, MO (United States). Kansas City Division

    1995-12-31T23:59:59.000Z

    With the end of the Cold War and the accelerated dismantlement of nuclear weapons, the nuclear material inventory of the United States is growing. In addition, the United States has offered these excess weapons-grade nuclear material assets for international inspections with the intent of encouraging reciprocal action by other nations. In support of this policy, Sandia National Laboratories has initiated a pilot effort (Project Straight-Line) to develop a flexible, site-independent system to continuously and remotely monitor stored nuclear material and integrate the collection, processing, and dissemination of information regarding this material to ensure that declared nuclear materials placed in storage remain in place, unaltered, and stable. As part of this effort, a +3.6V battery powered, modular sensor pack has been developed to monitor total radiation dose, radiation dose rate, and the temperature of each nuclear material container and to provide this information using a standardized sensor interface. This paper will discuss the development of the sensors, the engineering and production of the sensor pack units, and their installation and operation at sites in New Mexico, California, and the Pantex plant in Amarillo.

  17. Hanford Waste Simulants Created to Support the Research and Development on the River Protection Project - Waste Treatment Plant

    SciTech Connect (OSTI)

    Eibling, R.E.

    2001-07-26T23:59:59.000Z

    The development of nonradioactive waste simulants to support the River Protection Project - Waste Treatment Plant bench and pilot-scale testing is crucial to the design of the facility. The report documents the simulants development to support the SRTC programs and the strategies used to produce the simulants.

  18. Eight Advanced Coal Projects Chosen for Further Development by DOE's University Coal Research Program

    Broader source: Energy.gov [DOE]

    DOE has selected eight new projects to further advanced coal research under the University Coal Research Program. The selected projects will improve coal conversion and use and will help propel technologies for future advanced coal power systems.

  19. Low Wind Speed Turbine Development Project Report: November 4, 2002 - December 31, 2006

    SciTech Connect (OSTI)

    Mikhail, A.

    2009-01-01T23:59:59.000Z

    This report summarizes work conducted by Clipper Windpower under the DOE Low Wind Speed Turbine project. The objective of this project was to produce a wind turbine that can lower the cost of energy.

  20. In this project, researchers de-veloped alternative feeds for two

    E-Print Network [OSTI]

    Tryon, Michael D.

    that will be infused into pellets for feed for rainbow trout, part of another project. Image: Stephen Ausmus for USDA

  1. Agile project dynamics : a strategic project management approach to the study of large-scale software development using system dynamics

    E-Print Network [OSTI]

    Glaiel, Firas (Firas S.)

    2012-01-01T23:59:59.000Z

    Large-scale software engineering organizations have traditionally used plan-driven, heavyweight, waterfall-style approaches for the planning, execution, and monitoring of software development efforts. This approach often ...

  2. Battery-Powered Electric and Hybrid Electric Vehicle Projects to Reduce Greenhouse Gas Emissions: A Resource for Project Development

    SciTech Connect (OSTI)

    National Energy Technology Laboratory

    2002-07-31T23:59:59.000Z

    The transportation sector accounts for a large and growing share of global greenhouse gas (GHG) emissions. Worldwide, motor vehicles emit well over 900 million metric tons of carbon dioxide (CO2) each year, accounting for more than 15 percent of global fossil fuel-derived CO2 emissions.1 In the industrialized world alone, 20-25 percent of GHG emissions come from the transportation sector. The share of transport-related emissions is growing rapidly due to the continued increase in transportation activity.2 In 1950, there were only 70 million cars, trucks, and buses on the world’s roads. By 1994, there were about nine times that number, or 630 million vehicles. Since the early 1970s, the global fleet has been growing at a rate of 16 million vehicles per year. This expansion has been accompanied by a similar growth in fuel consumption.3 If this kind of linear growth continues, by the year 2025 there will be well over one billion vehicles on the world’s roads.4 In a response to the significant growth in transportation-related GHG emissions, governments and policy makers worldwide are considering methods to reverse this trend. However, due to the particular make-up of the transportation sector, regulating and reducing emissions from this sector poses a significant challenge. Unlike stationary fuel combustion, transportation-related emissions come from dispersed sources. Only a few point-source emitters, such as oil/natural gas wells, refineries, or compressor stations, contribute to emissions from the transportation sector. The majority of transport-related emissions come from the millions of vehicles traveling the world’s roads. As a result, successful GHG mitigation policies must find ways to target all of these small, non-point source emitters, either through regulatory means or through various incentive programs. To increase their effectiveness, policies to control emissions from the transportation sector often utilize indirect means to reduce emissions, such as requiring specific technology improvements or an increase in fuel efficiency. Site-specific project activities can also be undertaken to help decrease GHG emissions, although the use of such measures is less common. Sample activities include switching to less GHG-intensive vehicle options, such as electric vehicles (EVs) or hybrid electric vehicles (HEVs). As emissions from transportation activities continue to rise, it will be necessary to promote both types of abatement activities in order to reverse the current emissions path. This Resource Guide focuses on site- and project-specific transportation activities. .

  3. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    SciTech Connect (OSTI)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results in plant status control, information management, knowledge management, and 'Real-Time-Truth' as it relates to the current plant conditions. The following report includes two attachments; each attachment represents Pilot Project 1 and 3. The two attachments also provide a report on two distinct milestones that were completed and are described below: M3L11IN06030307 - Complete initiation of two pilot projects Complete initiation of pilot projects on real-time configuration management and control to overcome limitations with existing permanent instrumentation and real-time awareness of plant configurations; two candidate projects that consider low-cost wireless technology for in situ configuration monitoring and candidate technologies and an information architecture for outage management and control will be initiated with utilities. M3L11IN06030309 - Complete data collection, R&D plans, and agreements needed to conduct the two pilot projects Complete data collection conducted at pilot project utilities to support real-time configuration management and outage control center pilot studies conducted; R&D plan for pilot projects produced and needed agreements established to support R&D activities.

  4. 94-1 research and development project lead laboratory support. Status report, October 1--December 31, 1996

    SciTech Connect (OSTI)

    Rink, N.A. [comp.

    1997-07-01T23:59:59.000Z

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development (R and D) projects. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Materials Identification and Surveillance; Stabilization Process Development; Surveillance and Monitoring; Core Technology; Separations; Materials Science; Synthesis and Structural Characterization of Plutonium(IV) and Plutonium(VI) Phosphates; Plutonium Phosphate Solution Chemistry; and Molten Salt/Nonaqueous Electrochemistry.

  5. CO2 Capture Project: An Integrated, Collaborative Technology Development Project For CO2 Separation, Capture And Geologic Sequestration

    SciTech Connect (OSTI)

    Helen Kerr

    2002-01-10T23:59:59.000Z

    This report (which forms part of the requirements of the Statement of Work Task 0, subtask 0.4) records progress towards defining a detailed Work Plan for the CCP 30 days after contract initiation. It describes the studies planned, workscope development and technology provider bid evaluation status at that time. Business sensitive information is provided separately in Appendix 1. Contract negotiations are on hold pending award of patent waiver status to the CCP.

  6. Development of analytical cell support for vitrification at the West Valley Demonstration Project. Topical report

    SciTech Connect (OSTI)

    Barber, F.H.; Borek, T.T.; Christopher, J.Z. [and others

    1997-12-01T23:59:59.000Z

    Analytical and Process Chemistry (A&PC) support is essential to the high-level waste vitrification campaign at the West Valley Demonstration Project (WVDP). A&PC characterizes the waste, providing information necessary to formulate the recipe for the target radioactive glass product. High-level waste (HLW) samples are prepared and analyzed in the analytical cells (ACs) and Sample Storage Cell (SSC) on the third floor of the main plant. The high levels of radioactivity in the samples require handling them in the shielded cells with remote manipulators. The analytical hot cells and third floor laboratories were refurbished to ensure optimal uninterrupted operation during the vitrification campaign. New and modified instrumentation, tools, sample preparation and analysis techniques, and equipment and training were required for A&PC to support vitrification. Analytical Cell Mockup Units (ACMUs) were designed to facilitate method development, scientist and technician training, and planning for analytical process flow. The ACMUs were fabricated and installed to simulate the analytical cell environment and dimensions. New techniques, equipment, and tools could be evaluated m in the ACMUs without the consequences of generating or handling radioactive waste. Tools were fabricated, handling and disposal of wastes was addressed, and spatial arrangements for equipment were refined. As a result of the work at the ACMUs the remote preparation and analysis methods and the equipment and tools were ready for installation into the ACs and SSC m in July 1995. Before use m in the hot cells, all remote methods had been validated and four to eight technicians were trained on each. Fine tuning of the procedures has been ongoing at the ACs based on input from A&PC technicians. Working at the ACs presents greater challenges than had development at the ACMUs. The ACMU work and further refinements m in the ACs have resulted m in a reduction m in analysis turnaround time (TAT).

  7. UBC Social Ecological Economic Development Studies (SEEDS) Community Service Learning (CSL) Project

    E-Print Network [OSTI]

    ) Project Portable Shelving Units Student Report UBC Farm Work Flow CSL Project Nathan Baugh, Greg Emslie workspace in and around the Harvest Hut, the team determined construction of two portable shelving units of produce harvested every week. In addition, the shelving units need to provide effective vertical storage

  8. CO2 CAPTURE PROJECT-AN INTEGRATED, COLLABORATIVE TECHNOLOGY DEVELOPMENT PROJECT FOR NEXT GENERATION CO2 SEPARATION, CAPTURE AND GEOLOGIC SEQUESTRATION

    SciTech Connect (OSTI)

    Helen Kerr

    2004-04-01T23:59:59.000Z

    The CO{sub 2} Capture Project (CCP) is a joint industry project, funded by eight energy companies (BP, ChevronTexaco, EnCana, Eni, Norsk Hydro, Shell, Statoil, and Suncor) and three government agencies (European Union (DG Res & DG Tren), Norway (Klimatek) and the U.S.A. (Department of Energy)). The project objective is to develop new technologies, which could reduce the cost of CO{sub 2} capture and geologic storage by 50% for retrofit to existing plants and 75% for new-build plants. Technologies are to be developed to ''proof of concept'' stage by the end of 2003. The project budget is approximately $24 million over 3 years and the work program is divided into eight major activity areas: (1) Baseline Design and Cost Estimation--defined the uncontrolled emissions from each facility and estimate the cost of abatement in $/tonne CO{sub 2}. (2) Capture Technology, Post Combustion--technologies, which can remove CO{sub 2} from exhaust gases after combustion. (3) Capture Technology, Oxyfuel--where oxygen is separated from the air and then burned with hydrocarbons to produce an exhaust with wet high concentrations of CO{sub 2} for storage. (4) Capture Technology, Pre-Combustion--in which, natural gas and petroleum coke are converted to hydrogen and CO{sub 2} in a reformer/gasifier. (5) Common Economic Model/Technology Screening--analysis and evaluation of each technology applied to the scenarios to provide meaningful and consistent comparison. (6) New Technology Cost Estimation: on a consistent basis with the baseline above, to demonstrate cost reductions. (7) Geologic Storage, Monitoring and Verification (SMV)--providing assurance that CO{sub 2} can be safely stored in geologic formations over the long term. (8) Non-Technical: project management, communication of results and a review of current policies and incentives governing CO{sub 2} capture and storage. Technology development work dominated the past six months of the project. Numerous studies have completed their 2003 stagegate review and are reported here. Some will proceed to the next stagegate review in 2004. Some technologies are emerging as preferred over others. Pre-combustion De-carbonization (hydrogen fuel) technologies are showing excellent results and may be able to meet the CCP's aggressive cost reduction targets for new-build plants. The workscopes planned for the next key stagegates are under review before work begins based on the current economic assessment of their performance. Chemical looping to produce oxygen for oxyfuel combustion shows real promise. As expected, post-combustion technologies are emerging as higher cost options but even so some significant potential reductions in cost have been identified and will continue to be explored. Storage, measurement, and verification studies are moving rapidly forward and suggest that geologic sequestration can be a safe form of long-term CO{sub 2} storage. Hyper-spectral geo-botanical measurements may be an inexpensive and non-intrusive method for long-term monitoring. Modeling studies suggest that primary leakage routes from CO{sub 2} storage sites may be along old wellbores in areas disturbed by earlier oil and gas operations. This is good news because old wells are usually mapped and can be repaired during the site preparation process. Wells are also easy to monitor and intervention is possible if needed. The project will continue to evaluate and bring in novel studies and ideas within the project scope as requested by the DOE. The results to date are summarized in the attached report and presented in detail in the attached appendices.

  9. Session 6: Integrated Product Development and Project Management University of California, Washington Center Washington, DC May 6-9, 2013

    E-Print Network [OSTI]

    Martin, Gail

    D, Senior Vice President, Project Management, Endo 8:35 am 60 Decision Analysis Tools and Techniques Patricia Evans, PhD, Independent Consultant 9:35 am 50 Product Development Decision Making Jack M. Kloeber Risk and Return in Portfolio Management Patricia Evans, PhD, Independent Consultant 2:35 pm 60 Role

  10. Developing Alternative Markets for peach cull fruit --A new Michigan State University GREEEN project -Bill Shane and Tom

    E-Print Network [OSTI]

    Developing Alternative Markets for peach cull fruit -- A new Michigan State University GREEEN project - Bill Shane and Tom Zabadal, Michigan State University Michigan's fresh market peach crop Michigan peaches to make wine and brandy but the high costs of removing pits by hand have hampered this use

  11. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: Ł1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  12. Sustainable biomass products development and evaluation, Hamakua project. Final draft report

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    The PICHTR Sustainable Biomass Energy Program was developed to evaluate the potential to cultivate crops for energy production as an alternative use of lands made available by the closing of large sugar plantations. In particular, the closing of the Hamakua Sugar Company on the island of Hawaii brought a great deal of attention to the future of agriculture in this region and in the state. Many options were proposed. Several promising alternatives had been proposed for cane lands. These included dedicated feedstock supply systems (DFSS) for electrical energy production, cultivation of sugarcane to produce ethanol and related by-products, and the production of feed and crops to support animal agriculture. Implementation of some of the options might require preservation of large tracts of land and maintenance of the sugar mills and sugar infrastructure. An analysis of the technical, financial, and other issues necessary to reach conclusions regarding the optimal use of these lands was required. At the request of the Office of State Planning and Senator Akaka`s office, the Pacific International Center for High Technology Research (PICHTR) established and coordinated a working group composed of state, county, federal, and private sector representatives to identify sustainable energy options for the use of idle sugar lands on the island of Hawaii. The Sustainable Biomass Energy Program`s Hamakua Project was established to complete a comprehensive evaluation of the most viable alternatives and assess the options to grow crops as a source of raw materials for the production of transportation fuel and/or electricity on the island of Hawaii. The motivation for evaluating biomass to energy conversion embraced the considerations that Hawaii`s energy security would be improved by diversifying the fuels used for transportation and reducing dependency on imported fossil fuels. The use of waste products as feedstocks could divert wastes from landfills.

  13. Final Project Report: Tools for the Development of High Performance Energy Applications and Systems

    SciTech Connect (OSTI)

    Hollingsworth, Jeff

    2014-10-22T23:59:59.000Z

    This project concentrated on various aspects of creating tool infrastructure to make it easier to program large-scale parallel computers. The research conducted during this project is summarized in this report. The complete details of the work are available in the ten publications listed at the end of the report. Many of the concepts created during this project have been incorporated into tools and made available as freely downloadable software (at www.dyninst.org). It also supported the Ph.D. studies of three students.

  14. Developing document management for a large-scale engineering project at CERN. The case of ALICE-EDMS with TuoviWDM interface

    E-Print Network [OSTI]

    Saloranta-Rönkä, H

    1999-01-01T23:59:59.000Z

    Developing document management for a large-scale engineering project at CERN. The case of ALICE-EDMS with TuoviWDM interface

  15. FACILITIES ENGINEER WEST CHICAGO Execute capital projects for manufacturing facilities and utilities systems: scope development, cost

    E-Print Network [OSTI]

    Heller, Barbara

    FACILITIES ENGINEER ­ WEST CHICAGO OVERVIEW: Execute capital projects for manufacturing, and externally. Additional duties as assigned. QUALIFICATIONS: BS in Engineering from ABETaccredited program, or PE certification, required. 5+ years of experience in manufacturing engineering environment

  16. Developing Standard Logic for a Detailed Engineering Project Schedule in the Process Industry

    E-Print Network [OSTI]

    Miller-Karns, Kara A.

    2009-05-15T23:59:59.000Z

    A good schedule is critical to the successful execution of any project. This is especially true in the process industry, where construction schedule overruns can be costly to the client due to lost production capability. ...

  17. Rwanda-Project to Develop a National Strategy on Climate Change...

    Open Energy Info (EERE)

    for International Development, United Nations Development Programme (UNDP) Partner Smith School for Enterprise and Environment, University of Oxford Sector Climate, Energy,...

  18. The ICT SCRM CoMMunITy FRaMewoRk DevelopMenT pRojeCT

    E-Print Network [OSTI]

    for a more defined public/private partnership in this space has also been expressed as a call to action were an independent public/ private partnership model to spur further community development (which ways for the public and private sectors, as well as large numbers of standards development

  19. Project appraisal issues in developing countries (LDC's) with special reference to Indonesia

    E-Print Network [OSTI]

    Halimah, Nyimas

    1990-01-01T23:59:59.000Z

    of diverting funds from the private sector to public projects is the foregone returns to the higher-yielding private investments. Others argue that the use of private discount rates on public projects will lead to less than optimal levels of investment from... the point of view of a society defined as persisting through time. It is argued, thus, the interests of future generations are not taken into account if private discount rates are used (Peterson, et al. ). 2. Public versus private interests Individuals...

  20. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2003-01-28T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

  1. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2002-07-30T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. U.S. Steel teamed up with Calderon for a joint effort which will last 30 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy.

  2. Remote sensing data exploiration for geologic characterization of difficult targets : Laboratory Directed Research and Development project 38703 final report.

    SciTech Connect (OSTI)

    Costin, Laurence S.; Walker, Charles A.; Lappin, Allen R.; Hayat, Majeed M. (University of New Mexico, Albuquerque, NM); Ford, Bridget K.; Paskaleva, Biliana (University of New Mexico, Albuquerque, NM); Moya, Mary M.; Mercier, Jeffrey Alan (University of Arizona, Tucson, AZ); Stormont, John C. (University of New Mexico, Albuquerque, NM); Smith, Jody Lynn

    2003-09-01T23:59:59.000Z

    Characterizing the geology, geotechnical aspects, and rock properties of deep underground facility sites can enhance targeting strategies for both nuclear and conventional weapons. This report describes the results of a study to investigate the utility of remote spectral sensing for augmenting the geological and geotechnical information provided by traditional methods. The project primarily considered novel exploitation methods for space-based sensors, which allow clandestine collection of data from denied sites. The investigation focused on developing and applying novel data analysis methods to estimate geologic and geotechnical characteristics in the vicinity of deep underground facilities. Two such methods, one for measuring thermal rock properties and one for classifying rock types, were explored in detail. Several other data exploitation techniques, developed under other projects, were also examined for their potential utility in geologic characterization.

  3. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01T23:59:59.000Z

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  4. CO2 Capture Project-An Integrated, Collaborative Technology Development Project for Next Generation CO2 Separation, Capture and Geologic Sequestration

    SciTech Connect (OSTI)

    Helen Kerr; Linda M. Curran

    2005-04-15T23:59:59.000Z

    The CO{sub 2} Capture Project (CCP) was a joint industry project, funded by eight energy companies (BP, ChevronTexaco, EnCana, ENI, Norsk Hydro, Shell, Statoil, and Suncor) and three government agencies (European Union [DG RES & DG TREN], the Norwegian Research Council [Klimatek Program] and the U.S. Department of Energy [NETL]). The project objective was to develop new technologies that could reduce the cost of CO{sub 2} capture and geologic storage by 50% for retrofit to existing plants and 75% for new-build plants. Technologies were to be developed to ''proof of concept'' stage by the end of 2003. Certain promising technology areas were increased in scope and the studies extended through 2004. The project budget was approximately $26.4 million over 4 years and the work program is divided into eight major activity areas: Baseline Design and Cost Estimation--defined the uncontrolled emissions from each facility and estimate the cost of abatement in $/tonne CO{sub 2}. Capture Technology, Post Combustion: technologies, which can remove CO{sub 2} from exhaust gases after combustion. Capture Technology, Oxyfuel: where oxygen is separated from the air and then burned with hydrocarbons to produce an exhaust with high CO{sub 2} for storage. Capture Technology, Pre-Combustion: in which, natural gas and petroleum cokes are converted to hydrogen and CO{sub 2} in a reformer/gasifier. Common Economic Model/Technology Screening: analysis and evaluation of each technology applied to the scenarios to provide meaningful and consistent comparison. New Technology Cost Estimation: on a consistent basis with the baseline above, to demonstrate cost reductions. Geologic Storage, Monitoring and Verification (SMV): providing assurance that CO{sub 2} can be safely stored in geologic formations over the long term. Non-Technical: project management, communication of results and a review of current policies and incentives governing CO{sub 2} capture and storage. Pre-combustion De-carbonization (hydrogen fuel) technologies showed excellent results and may be able to meet the CCP's aggressive cost reduction targets for new-build plants. Chemical looping to produce oxygen for oxyfuel combustion shows real promise. Post-combustion technologies emerged as higher cost options that may only have niche roles. Storage, measurement, and verification studies suggest that geologic sequestration will be a safe form of long-term CO{sub 2} storage. Economic modeling shows that options to reduce costs by 50% exist. A rigorous methodology for technology evaluation was developed. Public acceptance and awareness were enhanced through extensive communication of results to the stakeholder community (scientific, NGO, policy, and general public). Two volumes of results have been published and are available to all. Well over 150 technical papers were produced. All funded studies for this phase of the CCP are complete. The results are summarized in this report and all final reports are presented in the attached appendices.

  5. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    SciTech Connect (OSTI)

    None

    1999-02-01T23:59:59.000Z

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  6. Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward for 750–800°C Reactor Outlet Temperature

    SciTech Connect (OSTI)

    John Collins

    2009-08-01T23:59:59.000Z

    This document presents the NGNP Critical PASSCs and defines their technical maturation path through Technology Development Roadmaps (TDRMs) and their associated Technology Readiness Levels (TRLs). As the critical PASSCs advance through increasing levels of technical maturity, project risk is reduced and the likelihood of within-budget and on-schedule completion is enhanced. The current supplier-generated TRLs and TDRMs for a 750–800°C reactor outlet temperature (ROT) specific to each supplier are collected in Appendix A.

  7. FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology

    E-Print Network [OSTI]

    Sandercock, Brett K.

    -7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institute Technology Center, National Renewable Energy Lab, karin_sinclair@nrel.gov, 303-384-6946 DOE Project Team: DOE in the performance of the award, which is protected from public release for a period of time by the terms

  8. International project finance : the case of Kuwait Fund for Arab Economic Development

    E-Print Network [OSTI]

    Al-Jassar, Sulaiman Ahmed

    2005-01-01T23:59:59.000Z

    This thesis examines the record of the Kuwait Fund for Arab Economic Development (KFAED) in light of changing fashions regarding the proper role and management of such funds in the development finance process. The key ...

  9. Development and use of site-specific chemical and biological criteria for assessing New Bedford Harbor pilot dredging project

    SciTech Connect (OSTI)

    Nelson, W.G.; Hansen, D.J.

    1991-01-01T23:59:59.000Z

    Numerical site-specific chemical and biological criteria were established to assess the impact of a pilot dredging project on water quality at the New Bedford Harbor, Massachusetts, USA, Superfund site. Because most existing chemical concentrations in the water column and indigenous biota exceeded federal and state water quality limits, the derivation of site-specific criteria was required. Prior to any operational phases of the project (i.e., dike construction, dredging), criteria values were developed from background concentrations of PCBs and metals in water and biota, as well as for the toxic effects of water quality on the biota. During each operational phase of the project, water samples were collected, analyzed within 16 h, and the data supplied to a management committee in order to assess the environmental impact of the previous days operation. The ambient unfiltered water concentration of PCBs and metals were the only chemical or biological criteria exceeded. Modification of the next days' operations resulted in a return of these concentrations to background levels. The combined use of site-specific criteria and a real-time decision making management process allowed for successful completion of the project with a minimal effect on water quality.

  10. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2003-10-22T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

  11. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon; Reina Calderon

    2004-01-27T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

  12. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2004-10-28T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort which will last 42 months to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets and coke.

  13. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2006-04-19T23:59:59.000Z

    This project was initially targeted to the making of coke for blast furnaces by using proprietary technology of Calderon in a phased approach, and Phase I was successfully completed. The project was then re-directed to the making of iron units. In 2000, U.S. Steel teamed up with Calderon for a joint effort to produce directly reduced iron with the potential of converting it into molten iron or steel consistent with the Roadmap recommendations of 1998 prepared by the Steel Industry in cooperation with the Department of Energy by using iron ore concentrate and coal as raw materials, both materials being appreciably lower in cost than using iron pellets, briquettes, sinter and coke.

  14. Development Of An Agroforestry Sequestration Project In KhammamDistrict Of India

    SciTech Connect (OSTI)

    Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.; Kulkarni, H.D.; Ravindranath, N.H.

    2007-06-01T23:59:59.000Z

    Large potential for agroforestry as a mitigation option hasgiven rise to scientific and policy questions. This paper addressesmethodological issues in estimating carbon sequestration potential,baseline determination, additionality and leakage in Khammam district,Andhra Pradesh, southern part of India. Technical potential forafforestation was determined considering the various landuse options. Forestimating the technical potential, culturable wastelands, fallow andmarginal croplands were considered for Eucalyptus clonal plantations.Field studies for aboveground and below ground biomass, woody litter andsoil organic carbon for baseline and project scenario were conducted toestimate the carbon sequestration potential. The baseline carbon stockwas estimated to be 45.33 tC/ha. The additional carbon sequestrationpotential under the project scenario for 30 years is estimated to be12.82 tC/ha/year inclusive of harvest regimes and carbon emissions due tobiomass burning and fertilizer application. The project scenario thoughhas a higher benefit cost ratio compared to baseline scenario, initialinvestment cost is high. Investment barrier exists for adoptingagroforestry in thedistrict.

  15. 2/14/14 10:42 AMThe Age of Sustainable Development by Jeffrey D. Sachs -Project Syndicate Page 1 of 4http://www.project-syndicate.org/print/jeffrey-d--sachs-proposes-a-new-curriculum-for-a-new-era

    E-Print Network [OSTI]

    2/14/14 10:42 AMThe Age of Sustainable Development by Jeffrey D. Sachs - Project Syndicate Page 1--sachs-proposes-a-new-curriculum-for-a-new-era EDUCATION JEFFREY D. SACHS Jeffrey D. Sachs, Professor of Sustainable Development, Professor of Health The End of Poverty and Common Wealth. DEC 23, 2013 The Age of Sustainable Development NEW YORK ­ A half

  16. 2/14/14 10:42 AMThe Age of Sustainable Development by Jeffrey D. Sachs -Project Syndicate Page 1 of 4http://www.project-syndicate.org/print/jeffrey-d--sachs-proposes-a-new-curriculum-for-a-new-era

    E-Print Network [OSTI]

    2/14/14 10:42 AMThe Age of Sustainable Development by Jeffrey D. Sachs - Project Syndicate Page 1--sachs-proposes-a-new-curriculum-for-a-new-era EDUCATION JEFFREY D. SACHS Jeffrey D. Sachs, Professor of Sustainable Development, Professor of Health The End of Poverty and Common Wealth. DEC 23, 2013 The Age of Sustainable Development NEW YORK ­ A half

  17. EA-1616: National Carbon Research Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama

    Broader source: Energy.gov [DOE]

    This EA evaluates and updates the potential environmental impacts of DOE’s proposed continued operations of the NCCC Project at the PSDF plant. The NCCC is designed to test and evaluate carbon dioxide (CO2) control technologies for power generation facilities, including CO2 capture solvents and sorbents, mass-transfer devices, lower cost water-gas shift reactors, and scaled-up membrane technologies. Additionally, the NCCC evaluates methods to integrate CO2 capture technologies with other coal-based power plant systems by testing both pre-combustion and post-combustion technologies. The NCCC provides the capability to test these systems under a wide range of fuels, including bituminous and sub-bituminous coals, lignites and biomass/coal mixtures. The goal of the NCCC project is to accelerate the development, optimization, and commercialization of viable CO2 control technologies.

  18. DOE Community-/Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    This interactive workshop will walk participants through five steps to help tribes understand the process for and potential pitfalls of developing community- and facility-scale renewable energy...

  19. Raising the Roof: California Housing Development Projections and Constraints, 1997-2020

    E-Print Network [OSTI]

    Landis, John D.

    2000-01-01T23:59:59.000Z

    2000-01 Raising the Roof: California Housing Developmentreport, “Raising the Roof: California Housing Developmentat Berkeley Raising the Roof: California Housing Development

  20. ARPA-E Announces $40 Million for Research Projects to Develop...

    Broader source: Energy.gov (indexed) [DOE]

    program will develop biological technologies that will improve the conversion of natural gas to liquids for transportation fuels, designed to reduce vehicle emissions compared to...

  1. Low Wind Speed Technology Phase I: Clipper Turbine Development Project; Clipper Windpower Technology, Inc.

    SciTech Connect (OSTI)

    Not Available

    2006-03-01T23:59:59.000Z

    This fact sheet describes a subcontract with Clipper Windpower Technology, Inc. to develop a new turbine design that incorporates advanced elements.

  2. DOE Funds 21 Research, Development and Demonstration Projects for up to $78

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJulyD&D Project|StatementDOE Fuel CellMillion to Promote

  3. Algae Biofuels Collaborative Project: Cooperative Research and Development Final Report, CRADA Number CRD-10-371

    SciTech Connect (OSTI)

    French, R. J.

    2012-04-01T23:59:59.000Z

    The goal of this project is to advance biofuels research on algal feedstocks and NREL's role in the project is to explore novel liquid extraction methods, gasification and pyrolysis as means to produce fuels from algae. To that end several different extraction methods were evaluated and numerous gasification and pyrolysis conditions were explored. It was found that mild hydrothermal treatment is a promising means to improve the extraction and conversion of lipids from algae over those produced by standard extraction methods. The algae were essentially found to gasify completely at a fairly low temperature of 750 degrees C in the presence of oxygen. Pyrolysis from 300-550 degrees C showed sequential release of phytene hydrocarbons, glycerides, and aromatics as temperature was increased. It appears that this has potential to release the glycerides from the non-fatty acid groups present in the polar lipids to produce a cleaner lipid. Further research is needed to quantify the pyrolysis and gasification yields, analyze the liquids produced and to test strategies for removing organic-nitrogen byproducts produced because of the high protein content of the feed. Possible strategies include use of high-lipid/low-protein algae or the use of catalytic pyrolysis.

  4. Stored CO2 and Methane Leakage Risk Assessment and Monitoring Tool Development: CO2 Capture Project Phase 2 (CCP2)

    SciTech Connect (OSTI)

    Dan Kieki

    2008-09-30T23:59:59.000Z

    The primary project goal is to develop and test tools for optimization of ECBM recovery and geologic storage of CO{sub 2} in coalbeds, in addition to tools for monitoring CO{sub 2} sequestration in coalbeds to support risk assessment. Three critical topics identified are (1) the integrity of coal bed methane geologic and engineered systems, (2) the optimization of the coal bed storage process, and (3) reliable monitoring and verification systems appropriate to the special conditions of CO{sub 2} storage and flow in coals.

  5. EA-0510: High-Temperature Solid Oxide Fuel Cell (Sofc) Generator Development Project (METC), Churchill, Pennsylvania

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to enter into a 5-year cooperative agreement with the Westinghouse Electric Corporation for the development of high-temperature solid oxide...

  6. Feasibility analysis of coordinated offshore wind project development in the U.S.

    E-Print Network [OSTI]

    Zhang, Mimi Q

    2008-01-01T23:59:59.000Z

    Wind energy is one of the cleanest and most available resources in the world, and advancements in wind technology are making it more cost effective. Though wind power is rapidly developing in many regions, its variable ...

  7. UBC Social Ecological Economic Development Studies (SEEDS) Student Report Sustainability of the UBC Food System Project III Scenario 8-Perceptions of UBC

    E-Print Network [OSTI]

    UBC Social Ecological Economic Development Studies (SEEDS) Student Report Sustainability of the UBC Food System Project III Scenario 8- Perceptions of UBC Customers regarding the price of food at UBC Sustainability of the UBC Food System Project III Scenario 8- Perceptions of UBC Customers regarding the price

  8. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1984-10-01T23:59:59.000Z

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  9. Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs for Phase 2 of the Secure Power Systems Professional project

    SciTech Connect (OSTI)

    O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.; Conway, T. J.; Vanderhorst, Jr, T. J.; Januszewski, III, J.; leo, R.; Perman, K.

    2013-08-26T23:59:59.000Z

    This is the final report of Phase 2 of the Secure Power Systems Professional project, a 3 phase project. DOE will post to their website upon release.

  10. Transportation energy strategy: Project {number_sign}5 of the Hawaii Energy Strategy Development Program

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    This study was prepared for the State Department of Business, Economic Development and Tourism (DBEDT) as part of the Hawaii Energy Strategy program. Authority and responsibility for energy planning activities, such as the Hawaii Energy Strategy, rests with the State Energy Resources Coordinator, who is the Director of DBEDT. Hawaii Energy Strategy Study No. 5, Transportation Energy Strategy Development, was prepared to: collect and synthesize information on the present and future use of energy in Hawaii`s transportation sector, examine the potential of energy conservation to affect future energy demand; analyze the possibility of satisfying a portion of the state`s future transportation energy demand through alternative fuels; and recommend a program targeting energy use in the state`s transportation sector to help achieve state goals. The analyses and conclusions of this report should be assessed in relation to the other Hawaii Energy Strategy Studies in developing a comprehensive state energy program. 56 figs., 87 tabs.

  11. Final report for the virtual channel encryptor laboratory directed research and development project

    SciTech Connect (OSTI)

    Gibson, D.J.; Sarfaty, R.A.

    1997-08-01T23:59:59.000Z

    A workstation with a single physical connection to a data communications network may have a requirement for simultaneous `virtual` communication channels to more than one destination. This report describes the development of techniques based on the Data Encryption Standard (DES) which encrypt these virtual channels to secure the data being transmitted against unauthorized access. A software module has been developed for the UNIX operating system using these techniques for encryption, and some development has also been done on a hardware device to be included between the workstation and network which can also provide these functions. The material presented in this report will be useful to those with a need to protect information in data communications systems from unauthorized access.

  12. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06T23:59:59.000Z

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  13. The Bui Dam impact on Ghana-China relations : transparency, accountability and development outcomes from China's Sino Hydro Dam Project in Ghana

    E-Print Network [OSTI]

    Habia, James K

    2009-01-01T23:59:59.000Z

    The current Afro-Chinese relations on development projects in Sub Saharan Africa has come under a lot of scrutiny, with some experts in the South-to-South relationship discourse claiming the above short-gun-marriage will ...

  14. Obtaining data for wind farm development and management: the EO-WINDFARM project

    E-Print Network [OSTI]

    providers, wind energy market players and end-users such as electricity companies. It is supported by the European Space Agency within the Earth Observation Market Development program. The set of data comprises production should then increase from 6 % to 12 % in 2010. While Europe is not rich in oil, gas and coal

  15. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects (small hydro and bagasse co-generators) andPCF) in Guatemala for a small hydro project assumes that the

  16. Numerical-model developments for stimulation technologies in the Eastern Gas Shales Project

    SciTech Connect (OSTI)

    Barbour, T.G.; Maxwell, D.E.; Young, C.

    1980-01-01T23:59:59.000Z

    These efforts were directed towards the development of a numerical tensile failure model that could be used to make a parameter sensitivity study of the EGSP wellbore stimulation methods for gas recovery in Devonain shales, calculations were performed using the NTS Multi-Frac Mineback Experiments as the geometry, boundary conditions and material properties of the models. Several major accomplishments were achieved during this task. These include: development of a Crack and Void Strain (CAVS) tensile failure model for one-dimensional fracture analysis using the one-dimensional geometries available in SAI's STEALTH 1-D finite-difference code; modification of the original CAVS tensile failure criteria to improve its representation of multiple fracture development by introducing a logic that adjusts the material's tensile strength (both for crack initiation and crack propagation) according to the degree of cracking that has occurred; adding a submodel to CAVS to allow for cracking propping when a crack is reclosed and to require energy to be expanded during this process; adding a submodel to CAVS to allow for crack pressurization when a crack void strain is in communication with the fluid pressure of the borehole; and performing a parameter sensitivity analysis to determine the effect that the material properties of the rock has on crack development, to include the effects of yielding and compaction. Using the CAVS model and its submodels, a series of STEALTH calculations were then performed to estimate the response of the NTS unaugmented Dynafrac experiment. Pressure, acceleration and stress time histories and snapshot data were obtained and should aid in the evaluation of these experiments. Crack patterns around the borehole were also calculated and should be valuable in a comparison with the fracture patterns observed during mineback.

  17. Metal hydride/chemical heat-pump development project. Phase I. Final report

    SciTech Connect (OSTI)

    Argabright, T.A.

    1982-02-01T23:59:59.000Z

    The metal hydride/chemical heat pump (MHHP) is a chemical heat pump containing two hydrides for the storage and/or recovery of thermal energy. It utilizes the heat of reaction of hydrogen with specific metal alloys. The MHHP design can be tailored to provide heating and/or cooling or temperature upgrading over a wide range of input and ambient temperatures. The system can thus be used with a variety of heat sources including waste heat, solar energy or a fossil fuel. The conceptual design of the MHHP was developed. A national market survey including a study of applications and market sectors was conducted. The technical tasks including conceptual development, thermal and mechanical design, laboratory verification of design and material performance, cost analysis and the detailed design of the Engineering Development Test Unit (EDTU) were performed. As a result of the market study, the temperature upgrade cycle of the MHHP was chosen for development. Operating temperature ranges for the upgrader were selected to be from 70 to 110/sup 0/C (160 to 230/sup 0/F) for the source heat and 140 to 190/sup 0/C (280 to 375/sup 0/F) for the product heat. These ranges are applicable to many processes in industries such as food, textile, paper and pulp, and chemical. The hydride pair well suited for these temperatures is LaNi/sub 5//LaNi/sub 4/ /sub 5/Al/sub 0/ /sub 5/. The EDTU was designed for the upgrade cycle. It is a compact finned tube arrangement enclosed in a pressure vessel. This design incorporates high heat transfer and low thermal mass in a system which maximizes the coefficient of performance (COP). It will be constructed in Phase II. Continuation of this effort is recommended.

  18. Final Report for the Scaled Asynchronous Transfer Mode (ATM) Encryption Laboratory Directed Research and Development Project

    SciTech Connect (OSTI)

    Pierson, L.G.; Witzke, E.L.

    1999-01-01T23:59:59.000Z

    This effort studied the integration of innovative methods of key management crypto synchronization, and key agility while scaling encryption speed. Viability of these methods for encryption of ATM cell payloads at the SONET OC- 192 data rate (10 Gb/s), and for operation at OC-48 rates (2.5 Gb/s) was shown. An SNL-Developed pipelined DES design was adapted for the encryption of ATM cells. A proof-of-principle prototype circuit board containing 11 Electronically Programmable Logic Devices (each holding the equivalent of 100,000 gates) was designed, built, and used to prototype a high speed encryptor.

  19. Development of a thermophilic SSF system for butanol production Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S HBatteries1000: Development of a Wet

  20. Development of an Integrated Biofuel and Chemical Refinery Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S HBatteries1000: Development of aan Integrated

  1. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    SciTech Connect (OSTI)

    Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

    2014-09-01T23:59:59.000Z

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

  2. Jobs and Economic Development Modeling

    Broader source: Energy.gov [DOE]

    Project objective: Develop models to estimate jobs and economic impacts from geothermal project development and operation.

  3. PHASE II CALDERON PROCESS TO PRODUCE DIRECT REDUCED IRON RESEARCH AND DEVELOPMENT PROJECT

    SciTech Connect (OSTI)

    Albert Calderon

    2005-10-14T23:59:59.000Z

    The commercialization path of the Calderon technology for making a feedstock for steelmaking with assistance from DOE initially focused on making coke and work was done which proved that the Calderon technology is capable of making good coke for hard driving blast furnaces. U.S. Steel which participated in such demonstration felt that the Calderon technology would be more meaningful in lowering the costs of making steel by adapting it to the making of iron--thus obviating the need for coke. U.S. Steel and Calderon teamed up to jointly work together to demonstrate that the Calderon technology will produce in a closed system iron units from iron concentrate (ore) and coal competitively by eliminating pelletizing, sintering, coking and blast furnace operation. If such process steps could be eliminated, a huge reduction in polluting emissions and greenhouse gases (including CO{sub 2}) relating to steelmaking would ensue. Such reduction will restructure the steel industry away from the very energy-intensive steelmaking steps currently practiced and drastically reduce costs of making steel. The development of a technology to lower U.S. steelmaking costs and become globally competitive is a priority of major importance. Therefore, the development work which Calderon is conducting presently under this Agreement with the U.S. Department of Energy becomes more crucial than ever. During the 3rd quarter of 2005 which the present report covers, virtually all the effort to advance the Calderon technology to make iron units was concentrated towards forming a team with a steelmaker who needs both iron units in the form of hot metal and a substitute for natural gas (SNG), both being major contributors to higher costs in steelmaking. Calderon felt that a very good candidate would be Steel Dynamics (SDI) by virtue that it operates a rotary hearth facility in Butler, Indiana that uses large amounts of natural gas to reduce briquettes made from ore and coal that they subsequently melt in a submerged arc furnace that is a large consumer of electric power. This facility is operated as a division of SDI under the name of Iron Dynamics (IDI). It is no secret that IDI has had and still has a great number of operational problems, including high cost for natural gas.

  4. Flexible system development strategies for the Chuo Shinkansen Maglev Project : dealing with uncertain demand and R&D outcomes

    E-Print Network [OSTI]

    Ishii, Masaki, S.M. Massachusetts Institute of Technology

    2007-01-01T23:59:59.000Z

    As a large-scale, long-term transportation project, the Chuo Shinkansen Maglev Project in Japan includes various uncertainties. Among them, two major uncertainties are identified in this thesis: the uncertainty of demand ...

  5. SUPPORT FOR THE COMPLETION OF THE ARM PROJECT AND DEVELOPMENT OF A FIELD DEMONSTRATION OF THE GWIS MODEL FOR A VIRTUAL ENTERPRISE

    SciTech Connect (OSTI)

    F. DAVID MARTIN; MARK B. MURPHY - STRATEGIC TECHNOLOGY RESOURCES, LLC

    1999-12-31T23:59:59.000Z

    Strategic Technology Resources, L.L.C. (STR) provided work for Los Alamos National Laboratory (LANL) in response to Request for Proposal 005BZ0019-35. The objectives of the work in this project were to: (1) support the completion of the Advanced Reservoir Management (ARM) cooperative research and development agreement (CRADA) LA9502037, and (2) support the development of a field demonstration of the LANL-developed Global Weapons Information System (GWIS) model for virtual enterprises. The second objective was contingent upon DOE approval of the Advanced Information Management (AIM) CRADA. At the request of the LANL Technical Representative, the project was granted a no-cost extension to November 30, 1999. As part of the project, STR provided managerial support for the ARM CRADA by: (1) assessing the data resources of the participating companies, (2) facilitating the transfer of technical data to LANL, (3) preparing reports, (4) managing communications between the parties to the ARM CRADA, and (5) assisting with the dissemination of information between the parties to technical professional societies and trade associations. The first phase of the current project was to continue to engage subcontractors to perform tasks in the ARM CRADA for which LANL expertise was lacking. All of the ARM field studies required of the project were completed, and final reports for all of the project studies are appended to this final report. The second phase of the current project was to support the field demonstration of the GWIS model for virtual enterprises in an oilfield setting. STR developed a hypertext Webpage that describes the concept and implementation of a virtual enterprise for reservoir management in the petroleum industry. Contents of the hypertext document are included in this report on the project.

  6. Kickoff meeting of the project "Sustainable ICT use in Education: Developing Teacher Training Material using ICT" in Mongolia

    E-Print Network [OSTI]

    Furui, Sadaoki

    Teacher Training Material using ICT" Project, was held in Mongolian State University of Education products and materials which were produced during the first phase of this project, in Dec 2010 - March 2011. Introduce of project from coordinator Introduce of the produced materials Participants of the meeting #12;

  7. Stages of Project Development

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    The chapter describes the various estimates and their relationship to each other as well as to the key decisions.

  8. MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives

    E-Print Network [OSTI]

    MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives vessel registries to conduct recreational catch and effort surveys. Develop a recreational fishing. Accuracy Funded 2012 Oregon Shore and EstuaryBoat Survey Design Review Develop a new or revised

  9. GLASS FORMULATION DEVELOPMENT AND TESTING FOR COLD CRUCIBLE INDUCTION MELTER (CCIM) ADVANCED REMEDIATION TECHNOLOGIES DEMONSTRATION PROJECT - 9208

    SciTech Connect (OSTI)

    Marra, J; Amanda Billings, A; David Peeler, D; Michael Stone, M; Tommy Edwards, T

    2008-08-27T23:59:59.000Z

    Over the past few years, Cold Crucible Induction Melter (CCIM) demonstrations have been completed using SRS sludge batches 2, 3 and 4 (SB2, SB3 and SB4) simulant compositions. These campaigns demonstrated the ability of the CCIM to effectively produce quality glasses at high waste loadings. The current Advanced Remediation Technology (ART) Phase II-A Project is aimed at demonstrating the CCIM technology under representative DWPF flowsheet conditions and to demonstrate extended operations of the melter. A glass composition development effort was completed to identify and recommend a frit composition and sludge batch 4 (SB4) simulant waste loading target for subsequent ART-Phase II-A CCIM demonstration testing. Based on the results of the glass formulation testing, it was recommended that the Frit 503-R6 composition (B{sub 2}O{sub 3} = 14 wt %; Li{sub 2}O = 9 wt %; Na{sub 2}O = 3 wt %; and SiO{sub 2} = 74 wt %) be utilized for the demonstration. Furthermore, a waste loading of 46 wt % was recommended. The recommended frit and waste loading would produce a glass with acceptable durability with a liquidus temperature adequately below the 1250 C nominal CCIM operating temperature. This frit composition and waste loading was found to result in a glass that met CCIM processing requirements for viscosity, electrical conductivity and thermal conductivity. The recommended frit and waste loading level should also provide a buffer for sludge product compositional variation to support the Phase II-A CCIM demonstration.

  10. Standing on the Shoulders of Giants: Results From the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP)

    SciTech Connect (OSTI)

    Holliday, Emma B. [The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Jagsi, Reshma [The University of Michigan, Ann Arbor, Michigan (United States); Thomas, Charles R. [Oregon Health Science Center Knight Cancer Institute, Portland, Oregon (United States); Wilson, Lynn D. [Department of Therapeutic Radiology, Yale University School of Medicine, Yale Cancer Center, New Haven, Connecticut (United States); Fuller, Clifton D., E-mail: cdfuller@mdanderson.org [The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Oregon Health Science Center Knight Cancer Institute, Portland, Oregon (United States)

    2014-01-01T23:59:59.000Z

    Purpose: To analyze survey information regarding mentorship practices and cross-correlate the results with objective metrics of academic productivity among academic radiation oncologists at US Accreditation Council for Graduate Medical Education (ACGME)-accredited residency training programs. Methods and Materials: An institutional review board-approved survey for the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP) was sent to 1031 radiation oncologists employed at an ACGME-accredited residency training program and administered using an international secure web application designed exclusively to support data capture for research studies. Data collected included demographics, presence of mentorship, and the nature of specific mentoring activities. Productivity metrics, including number of publications, number of citations, h-index, and date of first publication, were collected for each survey respondent from a commercially available online database, and m-index was calculated. Results: A total of 158 academic radiation oncologists completed the survey, 96 of whom reported having an academic/scientific mentor. Faculty with a mentor had higher numbers of publications, citations, and h- and m-indices. Differences in gender and race/ethnicity were not associated with significant differences in mentorship rates, but those with a mentor were more likely to have a PhD degree and were more likely to have more time protected for research. Bivariate fit regression modeling showed a positive correlation between a mentor's h-index and their mentee's h-index (R{sup 2} = 0.16; P<.001). Linear regression also showed significant correlates of higher h-index, in addition to having a mentor (P=.001), included a longer career duration (P<.001) and fewer patients in treatment (P=.02). Conclusions: Mentorship is widely believed to be important to career development and academic productivity. These results emphasize the importance of identifying and striving to overcome potential barriers to effective mentorship.

  11. Methodological and Practical Considerations for Developing Multiproject Baselines for Electric Power and Cement Industry Projects in Central America

    E-Print Network [OSTI]

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion, Kristel

    2008-01-01T23:59:59.000Z

    energy projects. Several bagasse cogeneration and hydroprojects (small hydro and bagasse co-generators) and 201 MWgrid. These facilities burn bagasse when it is available and

  12. Final Project Report: Development of Micro-Structural Mitigation Strategies for PEM Fuel Cells: Morphological Simulations and Experimental Approaches

    SciTech Connect (OSTI)

    Wessel, Silvia [Ballard Materials Products] [Ballard Materials Products; Harvey, David [Ballard Materials Products] [Ballard Materials Products

    2013-06-28T23:59:59.000Z

    The durability of PEM fuel cells is a primary requirement for large scale commercialization of these power systems in transportation and stationary market applications that target operational lifetimes of 5,000 hours and 40,000 hours by 2015, respectively. Key degradation modes contributing to fuel cell lifetime limitations have been largely associated with the platinum-based cathode catalyst layer. Furthermore, as fuel cells are driven to low cost materials and lower catalyst loadings in order to meet the cost targets for commercialization, the catalyst durability has become even more important. While over the past few years significant progress has been made in identifying the underlying causes of fuel cell degradation and key parameters that greatly influence the degradation rates, many gaps with respect to knowledge of the driving mechanisms still exist; in particular, the acceleration of the mechanisms due to different structural compositions and under different fuel cell conditions remains an area not well understood. The focus of this project was to address catalyst durability by using a dual path approach that coupled an extensive range of experimental analysis and testing with a multi-scale modeling approach. With this, the major technical areas/issues of catalyst and catalyst layer performance and durability that were addressed are: 1. Catalyst and catalyst layer degradation mechanisms (Pt dissolution, agglomeration, Pt loss, e.g. Pt in the membrane, carbon oxidation and/or corrosion). a. Driving force for the different degradation mechanisms. b. Relationships between MEA performance, catalyst and catalyst layer degradation and operational conditions, catalyst layer composition, and structure. 2. Materials properties a. Changes in catalyst, catalyst layer, and MEA materials properties due to degradation. 3. Catalyst performance a. Relationships between catalyst structural changes and performance. b. Stability of the three-phase boundary and its effect on performance/catalyst degradation. The key accomplishments of this project are: • The development of a molecular-dynamics based description of the carbon supported-Pt and ionomer system • The development of a composition-based, 1D-statistical Unit Cell Performance model • A modified and improved multi-pathway ORR model • An extension of the existing micro-structural catalyst model to transient operation • The coupling of a Pt Dissolution model to the modified ORR pathway model • The Development A Semi-empirical carbon corrosion model • The integration and release of an open-source forward predictive MEA performance and degradation model • Completion of correlations of BOT (beginning of test) and EOT (end of test) performance loss breakdown with cathode catalyst layer composition, morphology, material properties, and operational conditions • Catalyst layer durability windows and design curves • A design flow path of interactions from materials properties and catalyst layer effective properties to performance loss breakdown for virgin and degraded catalyst layers In order to ensure the best possible user experience we will perform a staged release of the software leading up to the webinar scheduled in October 2013. The release schedule will be as follows (please note that the manual will be released with the beta release as direct support is provided in Stage 1): • Stage 0 - Internal Ballard Release o Cross check of compilation and installation to ensure machine independence o Implement code on portable virtual machine to allow for non-UNIX use (pending) • Stage 1 - Alpha Release o The model code will be made available via a GIT, sourceforge, or other repository (under discussion at Ballard) for download and installation by a small pre-selected group of users o Users will be given three weeks to install, apply, and evaluate features of the code, providing feedback on issues or software bugs that require correction prior to beta release • Stage 2 - Beta Release o The model code repository is opened to the general public on a beta release c

  13. Now, more than ever, the world needs engineers. Especially in Australia, where mining and major development projects like the National Broadband Network rollout continue apace,

    E-Print Network [OSTI]

    Blennerhassett, Peter

    Architecture 36 Petroleum Engineering 37 Photovoltaics & Solar Energy Engineering 38 Renewable Energy in Australia, where mining and major development projects like the National Broadband Network rollout continue to command record salaries. But as Engineers Australia reported in August, the shortage of skilled engineers

  14. Abstract This paper is part of a two-year study to investigate the feasibility of initiating a Clean Development Mechanism (CDM) project in an indigenous com-

    E-Print Network [OSTI]

    Moore, Tim

    to the reduction of atmospheric carbon dioxide (CO2) while enhancing sustainable development in these host-use/land-cover baseline scenario and examine the role of local participation in assessing land-use change. In Ipeti´, land of using local knowledge in the establishment of baseline data for CDM projects. Our calculations C. Potvin

  15. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    SciTech Connect (OSTI)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01T23:59:59.000Z

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  16. The Value of Small-Scale Projects in Biodiversity Conservation and Sustainable Rural Development in the Ecuadorian Chocó

    E-Print Network [OSTI]

    Fernández, Sarah Haidée

    2013-01-01T23:59:59.000Z

    Ecotourism and Sustainable Development: Who Owns Paradise?Biodiversity for Sustainable Development. Oslo: ScandinavianConservation and Sustainable Development. Washington D.C. :

  17. The Value of Small-Scale Projects in Biodiversity Conservation and Sustainable Rural Development in the Ecuadorian Chocó

    E-Print Network [OSTI]

    Fernández, Sarah Haidée

    2013-01-01T23:59:59.000Z

    Conservation and Sustainable Development. Washington D.C. :Ecotourism and Sustainable Development: Who Owns Paradise?Globalisation, sustainable development, and environment: A

  18. Project identification and evaluation techniques for transportation infrastructure : assessing their role in metropolitan areas of developing countries

    E-Print Network [OSTI]

    Kumar, Vimal, S.M. Massachusetts Institute of Technology

    2009-01-01T23:59:59.000Z

    Project identification and evaluation of transportation infrastructure play a vital role in shaping and sustaining the forms of cities all over the world. These cities differ substantially in character and urban form and ...

  19. Development of a Pavement Maintenance and Rehabilitation Project Formation and Prioritization Methodology that Reflects Agency Priorities and Improves Network Condition

    E-Print Network [OSTI]

    Narciso, Paul John Ross

    2013-07-22T23:59:59.000Z

    crucial step in pavement management is the formation and prioritization of maintenance and rehabilitation (M&R) projects that compete for limited funding for inclusion in the agency’s multiyear pavement management plan (PMPs). In general, many highway...

  20. Texas A&M IT Project Management Office System Development Life Cycle Template Guide V1.0

    E-Print Network [OSTI]

    &M Information Technology Page 1 Revised 10/7/2013 Project Management Office SDLC Template Guide.docx pmo@tamu.edu Contents 1 - Introduction to the SDLC Guide...............................................................................................................2 2 - SDLC Introduction

  1. CX-010811: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-010811: Categorical Exclusion Determination South Louisiana Enhanced Oil Recovery (EOR)Sequestration Research and Development (R&D) Project CX(s) Applied: A1, A9, A11 Date:...

  2. CX-011803: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-011803: Categorical Exclusion Determination South Louisiana EORSequestration Research and Development Project CX(s) Applied: A1, A9, A11, B3.6 Date:...

  3. CX-007504: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  4. CX-008611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Oneida Nation Energy Optimization Model Development Project CX(s) Applied: B3.6, B3.8 Date: 07/17/2012 Location(s): Wisconsin Offices(s): Golden Field Office

  5. CX-011629: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Development Concept of Operations Improvement Project CX(s) Applied: B1.3, B1.16 Date: 06/05/2013 Location(s): Tennessee Offices(s): Y-12 Site Office

  6. CX-008002: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Small Scale Research and Development, Laboratory Operations, and Pilot Projects CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office

  7. CX-008010: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Small-Scale Research and Development Projects Using Nanoscale Materials CX(s) Applied: B3.15 Date: 12/12/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office

  8. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    NONE

    2007-06-15T23:59:59.000Z

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  9. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    SciTech Connect (OSTI)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01T23:59:59.000Z

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  10. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies. [Contains glossary and address list of geothermal project developers and owners

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs.

  11. SimHydro 2012: Hydraulic modeling and uncertainty, 12-14 September 2012, Sophia Antipolis N. Jean-Baptiste, C. Dore, P-O. Malaterre, J. Sau -Data assimilation for hydraulic state estimation of a development project

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    SimHydro 2012: Hydraulic modeling and uncertainty, 12-14 September 2012, Sophia Antipolis ­ N. Jean-Baptiste, C. Dorée, P-O. Malaterre, J. Sau - Data assimilation for hydraulic state estimation of a development project Data assimilation for hydraulic state estimation of a development project Assimilation de données

  12. Infrastructure and Operations Improvement Project Director |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    project risks. -Ensure that required and effective project management and control systems are developed, deployed and implemented to successfully manage and assess the project...

  13. Energy Savings Performance Contract Project Facilitators | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    developing U.S. Department of Energy (DOE) energy savings performance contract (ESPC) projects are required to work with a qualified project facilitator. Project...

  14. The process of and barriers to environmentally-oriented real estate development : examining the role of organizational structure, project delivery methods and contracts in low impact development

    E-Print Network [OSTI]

    Singh, Charu, M.C.P. Massachusetts Institute of Technology

    2006-01-01T23:59:59.000Z

    Low Impact Development (LID) is a site planning approach that limits the environmental impact of development on the local hydrological regime. By preserving and mimicking natural landscape features, LID introduces a new ...

  15. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  16. Los Proyectos de La Gamba: Gender Issues in Rural Sustainable Development Projects in the Southern Zone of Costa Rica

    E-Print Network [OSTI]

    Cockrum, Thayne J.

    2001-05-01T23:59:59.000Z

    In 1992 at the United Nations Conference on the Environment and Development (UNCED), Costa Rica pledged to make a political commitment to incorporate the sustainability of the environment into the socioeconomic development ...

  17. Awareness of sustainable development: why did the Saemangeum Tideland Reclamation Project lead to the first national controversy over sustainable development in South Korea?

    E-Print Network [OSTI]

    Choi, In Huck

    2009-06-02T23:59:59.000Z

    on the situation. The list of questions used in the key informant interviews can be found in Appendix B. Selection of the Interviewees and Methods 1) Total number of interviewees - thirteen Among the original target of 15 interviewees who were asked... on the Saemangeum Project, the thirteen interviewees can be classified into a pro-Saemangeuum group, an anti-Saemangeum group, and a neutral group. Refer to the Appendix B for a brief introduction of each interviewee and their pseudonyms.8 4) Methods...

  18. The Value of Small-Scale Projects in Biodiversity Conservation and Sustainable Rural Development in the Ecuadorian Chocó

    E-Print Network [OSTI]

    Fernández, Sarah Haidée

    2013-01-01T23:59:59.000Z

    Ecotourism and environmental conservation in Western Flores:countries. ” Environmental Conservation 15(2): 129-136.development. ” Environmental Conservation 23(3): 218-225.

  19. Job and Economic Development Impact (JEDI) Model: A User-Friendly Tool to Calculate Economic Impacts from Wind Projects; Preprint

    Wind Powering America (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment Activities Printable80 mPilot ProjectWindJEDIJob and

  20. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  1. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  2. Role of pilot projects and public acceptance in developing wireless power transmission as an enabling technology for space solar power systems

    SciTech Connect (OSTI)

    Woodell, M.I. [Bivings Woodell, Inc., Washington, DC (United States)] [Bivings Woodell, Inc., Washington, DC (United States); Schupp, B.W. [Raytheon Electronic Systems, Marlborough, MA (United States)] [Raytheon Electronic Systems, Marlborough, MA (United States)

    1996-12-31T23:59:59.000Z

    In all system concepts for delivering space solar power to terrestrial power systems, wireless power transmission (WPT) is identified as a critical link in the technology chain. To realize the full potential of WPT as an enabling technology for the development of space power systems, the technology needs to (1) be demonstrated as a commercially viable, low risk technology, and (2) be shown to be acceptable to the public. If WPT`s full potential is to be realized, its initial applications must be carefully chosen and demonstrated through a series of pilot projects which will develop both the technology and its public acceptance. This paper examines the role of pilot projects and how they will play an increasingly important role in the development and acceptance of WPT as an enabling technology for space solar power systems. Recognizing that public acceptance is the ultimate determinant of the commercial success or failure of a technology, the paper then explores the role of public opinion in the commercialization process of space solar power systems utilizing WPT. A framework that begins to define the process required to realize the full commercial potential of wireless power transmission is established. 21 refs., 1 fig., 2 tabs.

  3. Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.

    SciTech Connect (OSTI)

    Anderson, Temashio [Scotts Valley Band of Pomo Indians

    2013-06-28T23:59:59.000Z

    The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

  4. Solar Technology Validation Project - Solargen (Met Station): Cooperative Research and Development Final Report, CRADA Number CRD-09-367-06

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  5. Solar Technology Validation Project - Iberdrola Renewables, Inc.: Cooperative Research and Development Final Report, CRADA Number CRD-08-298-3

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  6. Solar Technology Validation Project - RES Americas: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-11

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  7. Solar Technology Validation Project - USS Data, LLC: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-04

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  8. Solar Technology Validation Project - Amonix, Inc.: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-13

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  9. Solar Technology Validation Project - Loyola Marymount University: Cooperative Research and Development Final Report, CRADA Number CRD-09-367-03

    SciTech Connect (OSTI)

    Wilcox, S.

    2013-08-01T23:59:59.000Z

    Under this Agreement, NREL will work with Participant to improve concentrating solar power system performance characterizations. This work includes, but is not limited to, research and development of methods for acquiring renewable resource characterization information using site-specific measurements of solar radiation and meteorological conditions; collecting system performance data; and developing tools for improving the design, installation, operation, and maintenance of solar energy conversion systems. This work will be conducted at NREL and Participant facilities.

  10. To appear in: Boden A, Mller C, Nett B. Conducting Business Ethnography in Global Software Development Projects of Small German Enterprises. Information and Software Technology. 2010; accepted for publication.

    E-Print Network [OSTI]

    of offshored software development work in SMEs [3,4,5,6]. The first part of the project was an explorative into offshoring in German small to medium-sized enterprises. Method: The material for this paper is based on reflections and field notes from two methodologically different research projects: an explorative ethnographic

  11. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  12. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  13. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  14. Decontamination systems information and research program -- Literature review in support of development of standard test protocols and barrier design models for in situ formed barriers project

    SciTech Connect (OSTI)

    NONE

    1994-12-01T23:59:59.000Z

    The US Department of Energy is responsible for approximately 3,000 sites in which contaminants such as carbon tetrachloride, trichlorethylene, perchlorethylene, non-volatile and soluble organic and insoluble organics (PCBs and pesticides) are encountered. In specific areas of these sites radioactive contaminants are stored in underground storage tanks which were originally designed and constructed with a 30-year projected life. Many of these tanks are now 10 years beyond the design life and failures have occurred allowing the basic liquids (ph of 8 to 9) to leak into the unconsolidated soils below. Nearly one half of the storage tanks located at the Hanford Washington Reservation are suspected of leaking and contaminating the soils beneath them. The Hanford site is located in a semi-arid climate region with rainfall of less than 6 inches annually, and studies have indicated that very little of this water finds its way to the groundwater to move the water down gradient toward the Columbia River. This provides the government with time to develop a barrier system to prevent further contamination of the groundwater, and to develop and test remediation systems to stabilize or remove the contaminant materials. In parallel to remediation efforts, confinement and containment technologies are needed to retard or prevent the advancement of contamination plumes through the environment until the implementation of remediation technology efforts are completed. This project examines the various confinement and containment technologies and protocols for testing the materials in relation to their function in-situ.

  15. Development conflicts over mineral resources are fairly widespread across the world, though often the debate on particular mining projects

    E-Print Network [OSTI]

    Vermont, University of

    and type of extraction processes as well as the process of engage- ment that corporations employDevelopment conflicts over mineral resources are fairly widespread across the world, though often for the French, who took control of the island in 1853, to begin exploiting the rich mineral resources

  16. Offshore Wind Project Map

    Broader source: Energy.gov [DOE]

    Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

  17. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    SciTech Connect (OSTI)

    Dinehart, M. [comp.

    1996-05-01T23:59:59.000Z

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included.

  18. Development of adherent ceramic coatings to reduce contact stress damage of ceramics. Final report: DOE/ORNL Ceramic Technology Project

    SciTech Connect (OSTI)

    Wayne, S.F.; Selverian, J.H.; O`Neil, D. [GTE Labs., Inc., Waltham, MA (United States)

    1992-11-01T23:59:59.000Z

    Strongly adherent coatings were deposited on reaction bonded Si{sub 3}N{sub 4} (RBSN), sintered SiC (SSC), and HIP`ed Si{sub 3}N{sub 4} (HSN) and using a newly developed chemical vapor deposition (CVD) process. Performance of the coating was assessed by oxidation, strength and contact stress testing. A new method was developed to experimentally determine the strength and Weibull modulus of thin brittle films on ceramic substrates. A significant portion of the study was devoted to numerical modeling of the coatings in order to understand the contributions of residual stress as different coating materials and thicknesses were combined. Coating designs were further analyzed by simulating the crack growth behavior in multilayer films while accounting for the interface fracture mechanics. This work has shown that the Al{sub 2}0{sub 3+}ZrO{sub 2} composite coating developed in this program can provide resistance to oxidation and contact stress. Commercial application of the composite coating has been successfully demonstrated by useof the Al{sub 2}0{sub 3+}ZrO{sub 2} composite as a protective coating on a Si{sub 3}N{sub 4} cutting tool.

  19. Status report of the EPA`s Air Pollution Prevention and Control Division`s biomass-to-energy development and demonstration projects

    SciTech Connect (OSTI)

    Purvis, C.R. [Environmental Protection Agency, Research Triangle Park, NC (United States); Cleland, J. [Research Triangle Institute, Research Triangle Park, NC (United States); Craig, J.D. [Cratech, Inc., Tahoka, TX (United States)] [and others

    1996-12-31T23:59:59.000Z

    The US Environmental Protection Agency`s (EPA`s) Air Pollution Prevention and Control Division (APPCD) is participating in research, development, and demonstration projects that will convert biomass energy to electrical power, resulting in waste utilization, pollution alleviation, and energy conservation. The goal is to demonstrate the technical, economic, and environmental feasibility of an innovative energy conversion technology. This paper describes the status of each project. The first project is a demonstration of a design that consists of a fixed-bed gasifier, a gas cleaning system, a spark ignited syngas engine, and a diesel dual fuel engine. The technology will use wood waste as fuel and produce approximately 1 MWe. The design of the technology is complete, equipment fabrication is underway, and installation, start-up, testing, and demonstration will follow by September 1996. The second project is a biomass-fueled intergrated-gasifier gas turbine (BIGGT) power plant. Phase 1 is complete and consisted of the design, fabrication, and operation of a 0.5 metric ton per hour (tph) (0.55 tph) pressurized fluidized-bed gasifier with a slipstream hot gas cleanup system. Phase 2 is to increase the feed rate to 1 metric tph (1.1 tph) and uprate the gasifier to operate at 10 atmospheres (981 kPa) with a full scale, dry, hot gas cleanup system capable of being integrated with a 1 MWe rated gas turbine engine. Construction of Phase 2 will begin in the summer of 1996. The third project is a demonstration of a biomass-fueled power plant. The system operates with an open Brayton cycle using a fluidized-bed combustor and heat exchangers to heat compressed air and drive a turbine/generator set. The system discharges clean hot air which can be used for cogeneration applications. The system will use lumber wastes as fuel and will produce approximately 200 kWe. Fabrication is underway, and the demonstration is scheduled to accumulate 8000 hours of operation over 1 to 2 years.

  20. USDA, DOE to Invest up to $18.4 million for Biomass Research, Development and Demonstration Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your DensityEnergy U.S.-China Electric Vehicle and BatteryUS-EU-Japan Working GroupDepartmentDevelopmentPage 1

  1. A Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development (Book), Powered by SunShot, U.S. Department of Energy (DOE)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  2. Development and technology transfer of the BNL flame quality indicator for oil-fired applications: Project report

    SciTech Connect (OSTI)

    Butcher, T.A.; Litzke, Wai Lin; McDonald, R.J.

    1994-09-01T23:59:59.000Z

    The purpose of a flame quality indicator is to continuously and closely monitor the quality of the flame to determine a heating system`s operating performance. The most efficient operation of a system is achieved under clean burning conditions at low excess air level. By adjusting a burner to function in such a manner, monitoring the unit to maintain these conditions can be accomplished with a simple, cheap and reliable device. This report details the development of the Flame Quality Indicator (FQI) at Brookhaven National Laboratory for residential oil-heating equipment. It includes information on the initial testing of the original design, field testing with other cooperating organizations, changes and improvements to the design, and finally technology transfer and commercialization activities geared towards the development of commercially available products designed for the oil heat marketplace. As a result of this work, a patent for the technology was obtained by the U.S. Department of Energy (DOE). Efforts to commercialize the technology have resulted in a high level of interest amongst industry members including boiler manufacturers, controls manufacturers, oil dealers, and service organizations. To date DOE has issued licenses to three different manufacturers, on a non-exclusive basis, to design, build, and sell FQIs.

  3. DEVELOPMENT OF HIGH TEMPERATURE MEMBRANES AND IMPROVED CATHODE CATALYSTS; PROJECT PERIOD JANUARY 1, 2002 - DECEMBER 31, 2005

    SciTech Connect (OSTI)

    Lesia Protsailo

    2006-04-20T23:59:59.000Z

    Polymer Electrolyte Membranes (PEMs) currently available for fuel cell development work are limited to the temperature range of 60-80°C. For mass commercialization in the transportation arena, three important disadvantages that are linked with the relatively low operating temperature range need to be addressed. These three disadvantages are: (a) sluggish cathode kinetics, (b) CO poisoning at the anode and (c) inefficient thermal characteristics. All three of the above mentioned disadvantages could be solved by increasing the operating temperature range to 100-120°C. To understand the issues associated with high temperature PEMFCs operation, UTCFC has teamed with leading research groups that possess competencies in the field of polymer chemistry. The subcontractors on the program were investigating modified Nafion® and new non-Nafion® based, reinforced and non-reinforced membrane systems. Nafion® based PEMs rely on using high temperature inorganic solid conductor fillers like phosphotungstic acid. Hydrocarbon membrane systems are based on poly (arylene ether sulfone) polymers, PEEK, PAN, etc.

  4. Methodological and Practical Considerations for DevelopingMultiproject Baselines for Electric Power and Cement Industry Projects inCentral America

    SciTech Connect (OSTI)

    Murtishaw, Scott; Sathaye, Jayant; Galitsky, Christina; Dorion,Kristel

    2004-09-02T23:59:59.000Z

    The Lawrence Berkeley National Laboratory (Berkeley Lab) andthe Center for Sustainable Development in the Americas (CSDA) conductedtechnical studies and organized two training workshops to developcapacity in Central America for the evaluation of climate changeprojects. This paper describes the results of two baseline case studiesconducted for these workshops, one for the power sector and one for thecement industry, that were devised to illustrate certain approaches tobaseline setting. Multiproject baseline emission rates (BERs) for themain Guatemalan electricity grid were calculated from 2001 data. Inrecent years, the Guatemalan power sector has experienced rapid growth;thus, a sufficient number of new plants have been built to estimateviable BERs. We found that BERs for baseload plants offsetting additionalbaseload capacity ranged from 0.702 kgCO2/kWh (using a weighted averagestringency) to 0.507 kgCO2/kWh (using a 10th percentile stringency),while the baseline for plants offsetting load-followingcapacity is lowerat 0.567 kgCO2/kWh. For power displaced from existing load-followingplants, the rate is higher, 0.735 kgCO2/kWh, as a result of the age ofsome plants used for meeting peak loads and the infrequency of their use.The approved consolidated methodology for the Clean Development Mechanismyields a single rate of 0.753 kgCO2/kWh. Due to the relatively smallnumber of cement plants in the region and the regional nature of thecement market, all of Central America was chosen as the geographicboundary for setting cement industry BERs. Unfortunately, actualoperations and output data were unobtainable for most of the plants inthe region, and many data were estimated. Cement industry BERs rangedfrom 205 kgCO2 to 225 kgCO2 per metric ton of cement.

  5. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  6. Project Profile: Direct Supercritical Carbon Dioxide Receiver...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Supercritical Carbon Dioxide Receiver Development Project Profile: Direct Supercritical Carbon Dioxide Receiver Development National Renewable Energy Laboratory logo The...

  7. Pilot-scale Limestone Emission Control (LEC) process: A development project. Volume 1, Main report and appendices A, B, C, and D: Final report

    SciTech Connect (OSTI)

    Prudich, M.E. [Ohio Univ., Athens, OH (United States); Appell, K.W.; McKenna, J.D. [ETS, Inc., Roanoke, VA (United States)

    1994-03-01T23:59:59.000Z

    ETS, Inc., a pollution consulting firm with headquarters in Roanoke, Virginia, has developed a dry, limestone-based flue gas desulfurization (FGD) system. This SO{sub 2} removal system, called Limestone Emission Control (LEC), can be designed for installation on either new or existing coal-fired boilers. In the LEC process, the SO{sub 2} in the flue gas reacts with wetted granular limestone that is contained in a moving bed. A surface layer of principally calcium sulfate (CaSO{sub 4}) is formed on the limestone. Periodic removal of this surface layer by mechanical agitation allows high utilization of the limestone granules. A nominal 5,000 acfm LEC pilot plant has been designed, fabricated and installed on the slipstream of a 70,000 pph stoker boiler providing steam to Ohio University`s Athens, Ohio campus. A total of over 90 experimental trials have been performed using the pilot-scale moving-bed LEC dry scrubber as a part of this research project with run times ranging up to a high of 125 hours. SO{sub 2} removal efficiencies as high as 99.9% were achievable for all experimental conditions studied during which sufficient humidification was added to the LEC bed. The LEC process and conventional limestone scrubbing have been compared on an equatable basis using flue gas conditions that would be expected at the outlet of the electrostatic precipitator (ESP) of a 500 MW coal-fired power plant. The LEC was found to have a definite economic advantage in both direct capital costs and operating costs. Based on the success and findings of the present project, the next step in LEC process development will be a full-scale commercial demonstration unit.

  8. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  9. 30 Recent Research Outputs - - Enhancing Small Group Teaching in Plant Sciences: A Research and Development Project in Higher Education (BERA 2006: CMI in Plant Sciences)

    E-Print Network [OSTI]

    Carmichael, P; Truscott, H; Tracy, Fran; Johnstone, Keith; Jordan, Katy; Irvine, N

    2010-03-30T23:59:59.000Z

    group teaching. In this paper we report selected findings from the 'student data' of the first year of this project....

  10. SunZia Southwest Transmission Project Comments

    Energy Savers [EERE]

    or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and...

  11. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  12. Fiscal years 1993 and 1994 decontamination and decommissioning activities photobriefing book for the Argonne National Laboratory-East Site, Technology Development Division, Decontamination and Decommissioning Projects Department

    SciTech Connect (OSTI)

    NONE

    1995-12-31T23:59:59.000Z

    This photobriefing book describes the ongoing decontamination and decommissioning projects at the Argonne National Laboratory (ANL)-East Site near Lemont, Illinois. The book is broken down into three sections: introduction, project descriptions, and summary. The introduction elates the history and mission of the Decontamination and Decommissioning (D and D) Projects Department at ANL-East. The second section describes the active ANL-East D and D projects, giving a project history and detailing fiscal year (FY) 1993 and FY 1994 accomplishments and FY 1995 goals. The final section summarizes the goals of the D and D Projects Department and the current program status. The D/D projects include the Experimental Boiling Water Reactor, Chicago Pile-5 Reactor, that cells, and plutonium gloveboxes. 73 figs.

  13. Geothermal Outreach and Project Financing

    SciTech Connect (OSTI)

    Elizabeth Battocletti

    2006-04-06T23:59:59.000Z

    The ?Geothermal Outreach and Project Financing? project substantially added to the understanding of geothermal resources, technology, and small business development by both the general public as well as those in the geothermal community.

  14. E85 Infrastrucutre Development Project

    Broader source: Energy.gov [DOE]

    Burl Haigwood's presentation on the Flex fuel vehicle awareness campaign from the May 12, 2011, Clean Cities and Biomass Program State webinar.

  15. Why Cogeneration Development Projects Fail

    E-Print Network [OSTI]

    Greenwood, R. W.

    for uninter ruptable supplies of delivered gas are hard to achieve and expensive bBckup systems, such as fuel oil, are likely to be required. For fuels other than natural gas, similar concerns also apply. If the fuel is a by-product such as petrole...

  16. Exploration Technology Development Project Summary

    E-Print Network [OSTI]

    Waliser, Duane E.

    capability from 150 m2 to 1500 m2 at TRL 5 · Correlate accelerated creep test data with real-time data within for high- power SEP tugs to TRL 5 · Quantify and establish creep and damage behavior of inflatable structures · Creep characterization of restraint layer webbing · Perform Damage Tolerance experiments

  17. The Development, Content, Design, and Conduct of the 2011 Piloted US DOE Nuclear Criticality Safety Program Criticality Safety Engineering Training and Education Project

    SciTech Connect (OSTI)

    Hopper, Calvin Mitchell [ORNL] [ORNL

    2011-01-01T23:59:59.000Z

    In May 1973 the University of New Mexico conducted the first nationwide criticality safety training and education week-long short course for nuclear criticality safety engineers. Subsequent to that course, the Los Alamos Critical Experiments Facility (LACEF) developed very successful 'hands-on' subcritical and critical training programs for operators, supervisors, and engineering staff. Since the inception of the US Department of Energy (DOE) Nuclear Criticality Technology and Safety Project (NCT&SP) in 1983, the DOE has stimulated contractor facilities and laboratories to collaborate in the furthering of nuclear criticality as a discipline. That effort included the education and training of nuclear criticality safety engineers (NCSEs). In 1985 a textbook was written that established a path toward formalizing education and training for NCSEs. Though the NCT&SP went through a brief hiatus from 1990 to 1992, other DOE-supported programs were evolving to the benefit of NCSE training and education. In 1993 the DOE established a Nuclear Criticality Safety Program (NCSP) and undertook a comprehensive development effort to expand the extant LACEF 'hands-on' course specifically for the education and training of NCSEs. That successful education and training was interrupted in 2006 for the closing of the LACEF and the accompanying movement of materials and critical experiment machines to the Nevada Test Site. Prior to that closing, the Lawrence Livermore National Laboratory (LLNL) was commissioned by the US DOE NCSP to establish an independent hands-on NCSE subcritical education and training course. The course provided an interim transition for the establishment of a reinvigorated and expanded two-week NCSE education and training program in 2011. The 2011 piloted two-week course was coordinated by the Oak Ridge National Laboratory (ORNL) and jointly conducted by the Los Alamos National Laboratory (LANL) classroom education and facility training, the Sandia National Laboratory (SNL) hands-on criticality experiments training, and the US DOE National Criticality Experiment Research Center (NCERC) hands-on criticality experiments training that is jointly supported by LLNL and LANL and located at the Nevada National Security Site (NNSS) This paper provides the description of the bases, content, and conduct of the piloted, and future US DOE NCSP Criticality Safety Engineer Training and Education Project.

  18. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

  19. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: Ł3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  20. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31T23:59:59.000Z

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

  1. Kansas Certified Development Companies (Kansas)

    Broader source: Energy.gov [DOE]

    Kansas Certified Development Companies (CDC) assist businesses by developing loan packages that meet the financial need of a project. These packages often contain multiple sources of project...

  2. Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling

    SciTech Connect (OSTI)

    Muons, Inc.

    2011-05-24T23:59:59.000Z

    The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

  3. UBC Social Ecological Economic Development Studies (SEEDS) Student Report The Sustainability of the UBC Food System Project: A Sustainable Business Plan for

    E-Print Network [OSTI]

    of the UBC Food System Project: A Sustainable Business Plan for Agora David Coney, Sandra Jacob, Yee Wah Lee should bear in mind that this is a student project/report and is not an official document of UBC. Furthermore readers should bear in mind that these reports may not reflect the current status of activities

  4. Agricultural capital project analysis system

    E-Print Network [OSTI]

    Lopez, Ramon Antonio

    1978-01-01T23:59:59.000Z

    Ecoromic Evaluation UNIDO Method Foreign Trade Distortion Distortion in the Factor Markets Discount Rate L&M Method Comparison with UNIDO Arguments in Favor Arguments Against the L&M Method Traditional Approach "Other"Approaches. . Risk... projects are development projects in developing coun- tries. They could be private or public. Examples of these are pro- duction and irrigation projects. Objectives The general objective of this research was to develop a co' mputer simulation package...

  5. Texas 4-H Beef Project

    E-Print Network [OSTI]

    Texas 4-H Beef Project Team

    2000-07-27T23:59:59.000Z

    This tri-fold brochure explains the opportunities in 4-H beef projects, the membership requirements, potential costs, goals and objectives, volunteer leader opportunities, and career development possibilities....

  6. Community- and Facility-Scale Tribal Renewable Energy Project...

    Office of Environmental Management (EM)

    Community- and Facility-Scale Tribal Renewable Energy Project Development and Finance Workshop: Colorado Community- and Facility-Scale Tribal Renewable Energy Project Development...

  7. Tribal Renewable Energy Advanced Course: Facility Scale Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Scale Project Development Tribal Renewable Energy Advanced Course: Facility Scale Project Development Watch the DOE Office of Indian Energy renewable energy course...

  8. Tribal Renewable Energy Advanced Course: Commercial Scale Project...

    Energy Savers [EERE]

    Commercial Scale Project Development Tribal Renewable Energy Advanced Course: Commercial Scale Project Development Watch the DOE Office of Indian Energy advanced course...

  9. Tribal Renewable Energy Advanced Course: Community Scale Project...

    Energy Savers [EERE]

    Tribal Renewable Energy Advanced Course: Community Scale Project Development Tribal Renewable Energy Advanced Course: Community Scale Project Development Watch the DOE Office of...

  10. Workshop Helps Empower Tribes to Make Renewable Energy Project...

    Energy Savers [EERE]

    Helps Empower Tribes to Make Renewable Energy Project Development Decisions Workshop Helps Empower Tribes to Make Renewable Energy Project Development Decisions July 16, 2013 -...

  11. Interns for Indiana (IFI) Project descriptions

    E-Print Network [OSTI]

    with the company after graduation, which allows him to work on cutting edge projects, aid in company growthInterns for Indiana (IFI) Projects Project descriptions: · Software development, database design analysis Past student project Development of animated graphics for web portal and product demos -Kevin

  12. Office: ITO PE/Project

    E-Print Network [OSTI]

    Mills, Kevin

    Mgr.: Mills/Swinson PAD No.: Smart Spaces Moving Through Smart Spaces "city-wide appliances" "in1 DARPA Office: ITO PE/Project: Pgm No.: Pgm Mgr.: Mills/Swinson PAD No.: Smart Spaces Personal Information Projection · Develop techniques for projecting personal information from cyberspace into smart

  13. The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part II Availability of Flow and Water Quality Data for the Rio Grande Project Area

    E-Print Network [OSTI]

    Tillery, Sue; Sheng, Zhuping; King, J. Phillip; Creel, Bobby; Brown, Christopher; Michelsen, Ari; Srinivasan, Raghavan; Granados, Alfredo

    2009-01-01T23:59:59.000Z

    Cruces, NM 88003 (575) 646-4337 i i Acknowledgement This document and the underlying pr oject activities detailed in this report reflect the joint efforts of many people working with the Paso del Norte Watershed Council (PdNWC). The authors... wish to acknowledge and extend our grat itude to the U.S. Army Corps of Engineers for the generous financial support extende d to the PdNWC for development of the Coordinated Water Resources Database and Model Developm ent Project (called Project...

  14. Development and Testing of Simulation (Game) to Illustrate Basic Principles of Integrated Project Delivery and Target Value Design: A First Run Study

    E-Print Network [OSTI]

    Munankami, Manish 1972-

    2012-12-07T23:59:59.000Z

    ..................................................................... 57 x Page Figure 38 BIM presentations at big room meeting, COOK?S Children Hospital ... 69 Figure 39 Example of schedule ............................................................................... 69 Figure 40 Target Cost and achieved... (Macomber, 2009). TVD was researched and created by the Lean Project Consulting, Inc. Company formed by Greg Howell and Glenn Ballard and later joined by others. The term was first used for the Sutter Health Project (Macomber, 2009). Like TVD...

  15. TSSWCB Bacteria-Related Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  16. Big Island Demonstration Project – Black Liquor

    Broader source: Energy.gov [DOE]

    This fact sheet summarizes a U.S. Department of Energy Biomass Program research and development project.

  17. Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-07T23:59:59.000Z

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  18. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  19. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  20. Misadventures in Conservation and Development

    E-Print Network [OSTI]

    Hall, Sharon J.

    and Development Projects in Indonesian national parks, the global trade in electronic waste, and the regulation

  1. The project PPPserve (Network based GNSS Phase Biases to enhance PPP Applications A new Service Level of GNSS Reference Station Provider) aims at the development and

    E-Print Network [OSTI]

    Schuh, Harald

    PPPserve The project PPPserve (Network based GNSS Phase Biases to enhance PPP Applications Standard (RTCM 3.2, State Space Representation = SSR) which supports PPP. New receiver hard and software are the missing link at user side to allow for PPP based phase ambiguity resolution. Applying relevant satellite

  2. The literature indicates success evidences for XP in the development of small and medium software projects (Dyba et al., 2008; Salo et al.,

    E-Print Network [OSTI]

    Québec, Université du

    of XP for implementing complex projects, or for ISO 9001 certification that requires a number of quality requirements to be implemented at the process level. The ISO 9001 process model requires necessary to Support ISO 9001 Requirements . Research Problem . © Malik Qasaimeh & Alain Abran, 2010 Département de

  3. Abstract This paper is part of a two-year study to investigate the feasibility of initiating a Clean Development Mechanism (CDM) project in an indigenous com-

    E-Print Network [OSTI]

    Bermingham, Eldredge

    -use/land-cover baseline scenario and examine the role of local participation in assessing land-use change. In Ipeti´, land of using local knowledge in the establishment of baseline data for CDM projects. Our calculations C. Potvin, Panama´, Panama´ T. Moore Department of Geography, McGill University, Montre´al, Canada 123 Mitig Adapt

  4. Ceramic Technology Project

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  5. CONNECTICUT BIOFUELS TECHNOLOGY PROJECT

    SciTech Connect (OSTI)

    BARTONE, ERIK

    2010-09-28T23:59:59.000Z

    DBS Energy Inc. (“DBS”) intends on using the Connecticut Biofuels Technology Project for the purpose of developing a small-scale electric generating systems that are located on a distributed basis and utilize biodiesel as its principle fuel source. This project will include research and analysis on the quality and applied use of biodiesel for use in electricity production, 2) develop dispatch center for testing and analysis of the reliability of dispatching remote generators operating on a blend of biodiesel and traditional fossil fuels, and 3) analysis and engineering research on fuel storage options for biodiesel of fuels for electric generation.

  6. CX-008533: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office

  7. Public Health Air Surveillance Evaluation Project Public Health Air Surveillance Evaluation (PHASE) Project

    E-Print Network [OSTI]

    Public Health Air Surveillance Evaluation Project Public Health Air Surveillance Evaluation (PHASE) Project Evaluating, Developing, and Delivering Air Quality Characterization Data to Environmental Public Public Health Tracking (EPHT) Network. The EPA is developing routinely available air quality information

  8. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  9. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  10. IDAHO BIODIESEL INFRASTRUCTURE PROJECT DOE'S INITIATIVE ON COOPERATIVE PROGRAMS WITH STATES FOR RESEARCH, DEVELOPMENT AND DEMONSTRATION GRANT NO. DE-FC36-02GO12021. Final report

    SciTech Connect (OSTI)

    CROCKETT, JOHN

    2006-12-31T23:59:59.000Z

    The Idaho Energy Division issued a Request for Proposal (RFP) on March 14, 2006, inviting qualified licensed fuel wholesalers, fuel retailers, and vehicle fleet operators to provide proposals to construct and/or install infrastructure for biodiesel utilization in Idaho. The intent was to improve the ability of private and/or non-Federal public entities in Idaho to store, transport, or offer for sale biodiesel within the state. The RFP provided up $100,000 for co-funding the projects with a minimum 50% cash cost match. Four contracts were subsequetnly awarded that resulted in three new bidodiesel storage facilities immediately serving about 45 fueling stations from Sandpoint to Boise. The project also attracted considerable media attention and Idaho became more knowledgeable about biodiesel.

  11. SUSTAINABLE DEVELOPMENT

    E-Print Network [OSTI]

    van der Torre, Leon

    Report on SUSTAINABLE DEVELOPMENT 2 0 1 1 ­ 2 0 1 2 ISCN-GULF Charter Report #12;3 1. FACILITIES with projects of our University's Cell for Sustainable Development; it also presents evidence for steady alike. THIS REPORT This is the second report on sustainable development at the University of Luxembourg

  12. UTCA Project 99244 December 30, 2000

    E-Print Network [OSTI]

    Pitt, Robert E.

    UTCA Project 99244 December 30, 2000 Development of a GIS-Based Hazardous Materials Transportation Development of a GIS-Based Hazardous Materials Transportation Management System; A Demonstration Project 6 Management System A Demonstration Project Samina T. Panwhar and Robert Pitt Department of Civil

  13. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30T23:59:59.000Z

    The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

  14. Silver Peak Innovative Exploration Project

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

  15. Project Management Plan Project Title: Natural Resources Management

    E-Print Network [OSTI]

    US Army Corps of Engineers

    DEFINITION. The NRM Gateway is a knowledge management resource, designed to serve the needs of the NRMP; · Preserve institutional knowledge; · Develop practical and agency-approved webpages that provide usefulProject Management Plan Project Title: Natural Resources Management (NRM) Gateway Website

  16. FY09 LDRD Projects 2009 Projects Page 1

    E-Print Network [OSTI]

    Ohta, Shigemi

    07-030 Structure of Mass-Size Selected Nanoparticles by Scanning Transmission Electron Microscopy Projects Page 2 LDRD Proj. No. Project Title P.I. Dept./Bldg. 07-054 Miniaturized RF Coil Arrays for Micro Panessa-Warren, B. ES&T/475C 07-073 Development of Room-temperature CdMnTe Gamma- ray Detectors Cui, Y

  17. LATEST PROJECTS & Preview a few of our latest research projects

    E-Print Network [OSTI]

    California at Davis, University of

    and development, disseminate informa- tion, and facilitate programs that reduce cooling system electrical demandLATEST PROJECTS & UPDATES Preview a few of our latest research projects & updates pg. 8 ENERGY?: pg. 5 #12;WESTERN COOLING CONNECTION2 Beutler Carrier Coolerado Davis Energy Group Integrated Comfort

  18. U.S. Department of Energy Acquisition Strategy Guide for Capital Assets Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-07-22T23:59:59.000Z

    This Guide serves as a tool for federal project directors developing a project acquisition strategy document. No cancellation.

  19. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  20. EA-1827: Suniva, Inc.'s ARTisun Photovoltaic Manufacturing Project...

    Office of Environmental Management (EM)

    ARTisun Photovoltaic Manufacturing Project in Saginaw, MI February 1, 2010 EA-1827: Final Environmental Assessment Suniva Solar Project Site Community Development Block Grant in...