Sample records for development planning pathways

  1. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  2. Long Range Development Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan...

  3. Graphite Technology Development Plan

    SciTech Connect (OSTI)

    W. Windes; T. Burchell; M.Carroll

    2010-10-01

    The Next Generation Nuclear Plant (NGNP) will be a helium-cooled High Temperature Gas Reactor (HTGR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Graphite has been used effectively as a structural and moderator material in both research and commercial high-temperature gas-cooled reactors. This development has resulted in graphite being established as a viable structural material for HTGRs. While the general characteristics necessary for producing nuclear grade graphite are understood, historical nuclear grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermomechanical design of the structural graphite in NGNP is based. This Technology Development Plan outlines the research and development (R&D) activities and associated rationale necessary to qualify nuclear grade graphite for use within the NGNP reactor.

  4. Developing an Evaluation Measurement, and Verification Plan:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Developing an Evaluation Measurement, and Verification Plan: Residential Retrofits Developing an Evaluation Measurement, and Verification Plan: Residential Retrofits DOE's...

  5. Aggressive development plans

    SciTech Connect (OSTI)

    McCandless, D.H.

    1993-11-01

    Hydropower developments are capital-intensive, are subject to uncertainty in water availability, and have a somewhat higher construction-cost risk than thermal projects. However, a developer who selects an attractive site, arranges a good financial package, and designs and constructs a well-conceived hydropower project can earn an attractive long-term return while providing a dependable, low-cost source of energy to consumers. In the Philippines, many attractive hydropower sites are now available. As demonstrated by the attendance at the US Trade and Development Agency-sponsored Symposium on Power Development and Investment Opportunities in the Philippines, in Washington, D.C., on Sept. 21 and 22, 1993, there is a growing interest in private hydropower. Following its successful record in implementing thermal private power developments, the Philippines now offers many attractive opportunities to exploit its tremendous potential in the hydropower sector.

  6. Environmental development plan: coal liquefaction

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    This Environmental Development plan (EDP) examines environmental concerns that are being evaluated for the technologies in DOE's Coal Liquefaction Program. It identifies the actions that are planned or underway to resolve these concerns while the technologies are being developed. Research is scheduled on the evaluation and mitigation of potential environmental impacts. This EDP updates the FY 1977 Coal Liquefaction Program EDP. Chapter II describes the DOE Coal Liquefaction Program and focuses on the Solvent Refined Coal (SRC), H-Coal, and Exxon donor solvent (EDS) processes because of their relatively advanced R and D stages. The major unresolved environmental concerns associated with the coal liquefaction subactivities and projects are summarized. The concerns were identified in the 1977 EDP's and research was scheduled to lead to the resolution of the concerns. Much of this research is currently underway. The status of ongoing and planned research is shown in Table 4-1.

  7. Pathways to Energy Development and Energy Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning * Creating a roadmap Feasibility Study * Possible roads to the ... Plan * Putting it all together (The Roadmap) Strategic Energy Planning Identify and ...

  8. strategic-plan-for-advanced-model-development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan for Advanced Model Development at CMAP Kermit Wies List of Authors ================ Kermit Wies Chicago Metropolitan Agency for Planning 312 386 8820 This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract ========= The CMAP modeling cadre (under contract) is preparing a detailed multi-year plan for establishing advanced travel modeling in the Chicago region. A feature of the plan will be a schedule for pursuing development of

  9. Developing a Water Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facilities Water Efficiency Developing a Water Management Plan Developing a Water Management Plan Developing a Water Management Plan A successful water management program ...

  10. Mainstreaming Climate Change Adaptation into Development Planning...

    Open Energy Info (EERE)

    Climate Change Adaptation into Development Planning: A Guide for Practitioners Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Mainstreaming Climate Change Adaptation...

  11. Nuclear Safety Research and Development Program Operating Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating ...

  12. Sample Plan of Development | Open Energy Information

    Open Energy Info (EERE)

    Sample Plan of DevelopmentLegal Published NA Year Signed or Took Effect 2001 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  13. Agua Caliente Band - Strategic Energy Plan Development

    Energy Savers [EERE]

    STRATEGIC ENERGY PLAN DEVELOPMENT Agua Caliente Band of Cahuilla Indians Agua Caliente Indian Reservation Program Overview GOALS * Establishment of a Comprehensive Tribal Energy Policy * Incorporate Energy Efficiency, Renewable Resources into Tribal Economic Development Framework * Capture Economic and Environmental Benefits While Maintaining Respect for Tribal Culture and Traditions PROGRAM OVERVIEW Goals * Create a Living Document That Will Be Responsive to the Planning Needs of the Tribe *

  14. Global Nuclear Energy Partnership Technology Development Plan

    SciTech Connect (OSTI)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  15. India-Low Carbon and Climate Resilience Development Planning...

    Open Energy Info (EERE)

    India-Low Carbon and Climate Resilience Development Planning Jump to: navigation, search Name CDKN-India-Low Carbon and Climate Resilience Development Planning AgencyCompany...

  16. India-Low Carbon and Climate Resilience Development Planning...

    Open Energy Info (EERE)

    India-Low Carbon and Climate Resilience Development Planning (Redirected from CDKN-India-Low Carbon and Climate Resilience Development Planning) Jump to: navigation, search Name...

  17. Thailand-National Energy Policy and Development Plan | Open Energy...

    Open Energy Info (EERE)

    Policy and Development Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Thailand-National Energy Policy and Development Plan AgencyCompany Organization: Government...

  18. South Africa-National Development Plan: Vision for 2030 | Open...

    Open Energy Info (EERE)

    Development Plan" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-NationalDevelopmentPlan:Visionfor2030&oldid391220" Feedback Contact needs...

  19. Morocco-Low Carbon Development Planning in the Power Sector ...

    Open Energy Info (EERE)

    Low Carbon Development Planning in the Power Sector Jump to: navigation, search Logo: Morocco-Low Carbon Development Planning in the Power Sector Name Morocco-Low Carbon...

  20. Nigeria-Low Carbon Development Planning in the Power Sector ...

    Open Energy Info (EERE)

    Low Carbon Development Planning in the Power Sector Jump to: navigation, search Logo: Nigeria-Low Carbon Development Planning in the Power Sector Name Nigeria-Low Carbon...

  1. Fuel Cell Economic Development Plan Hydrogen Roadmap | Open Energy...

    Open Energy Info (EERE)

    Development Plan Hydrogen Roadmap Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Fuel Cell Economic Development Plan Hydrogen Roadmap AgencyCompany Organization:...

  2. Development Plan for the Fuel Cycle Simulator

    SciTech Connect (OSTI)

    Brent Dixon

    2011-09-01

    The Fuel Cycle Simulator (FCS) project was initiated late in FY-10 as the activity to develop a next generation fuel cycle dynamic analysis tool for achieving the Systems Analysis Campaign 'Grand Challenge.' This challenge, as documented in the Campaign Implementation Plan, is to: 'Develop a fuel cycle simulator as part of a suite of tools to support decision-making, communication, and education, that synthesizes and visually explains the multiple attributes of potential fuel cycles.'

  3. Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan

    Broader source: Energy.gov [DOE]

    The 2006 Hydrogen Posture Plan satisfies Section 804 of the Energy Policy Act of 2005, which requires that the Secretary of Energy transmit to Congress a coordinated plan for the Department’s hydrogen and fuel cell programs.

  4. Planning for Energy Development: Strategic Energy Planning REnewable...

    Energy Savers [EERE]

    November 18, 2011 Strategic Energy Planning Renewable Energy Demonstration Center Concept Mecca, CA Awardee: Cabazon Band of Mission Indians Chairman David Roosevelt 2 CBMI ...

  5. Laboratory Directed Research and Development Plan - FY2013 | The Ames

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Laboratory Directed Research and Development Plan - FY2013 Document Number: NA Effective Date: 10/2014 File (public): PDF icon plan_ldrd_fy

  6. Development of Site Transition Plan, Use of the Site Transition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, ...

  7. Laboratory Directed Research and Development Plan | The Ames...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Directed Research and Development Plan Version Number: 0.1 Document Number: Plan 30000.001 Effective Date: 012014 File (public): PDF icon plan30000.001rev0.1.pdf...

  8. Fuel Fabrication Capability Research and Development Plan

    SciTech Connect (OSTI)

    Senor, David J.; Burkes, Douglas

    2014-04-17

    The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors. Therefore, the overriding motivation behind the FFC R&D program described in this plan is to foster closer integration between fuel design and fabrication to reduce programmatic risk. These motivating factors are all interrelated, and progress addressing one will aid understanding of the others. The FFC R&D needs fall into two principal categories, 1) baseline process optimization, to refine the existing fabrication technologies, and 2) manufacturing process alternatives, to evaluate new fabrication technologies that could provide improvements in quality, repeatability, material utilization, or cost. The FFC R&D Plan examines efforts currently under way in regard to coupon, foil, plate, and fuel element manufacturing, and provides recommendations for a number of R&D topics that are of high priority but not currently funded (i.e., knowledge gaps). The plan ties all FFC R&D efforts into a unified vision that supports the overall Convert Program schedule in general, and the fabrication schedule leading up to the MP-1 and FSP-1 irradiation experiments specifically. The fabrication technology decision gates and down-selection logic and schedules are tied to the schedule for fabricating the MP-1 fuel plates, which will provide the necessary data to make a final fuel fabrication process down-selection. Because of the short turnaround between MP-1 and the follow-on FSP-1 and MP-2 experiments, the suite of specimen types that will be available for MP-1 will be the same as those available for FSP-1 and MP-2. Therefore, the only opportunity to explore parameter space and alternative processing is between now and 2016 when the candidate processes are down-selected in preparation for the MP-1, FSP-1, and MP-2 plate manufacturing campaigns. A number of key risks identified by the FFC are discussed in this plan, with recommended mitigating actions for those activities within FFC, and identification of risks that are impacted by activities in other areas of the Convert Program. The R&D Plan does not include discussion of FFC initiatives related to production-scale manufacturing of fuel (e.g., establishment of the Pilot Line Production Facility), rather, the goal of this plan is to document the R&D activities needed ultimately to enable high-quality and cost-effective production of the fuel by the commercial fuel fabricator. The intent is for this R&D Plan to be a living document that will be reviewed and updated on a regular basis (e.g., annually) to ensure that FFC R&D activities remain properly aligned to the needs of the Convert Program. This version of the R&D Plan represents the first annual review and revision.

  9. Power Line Plan of Development Outline | Open Energy Information

    Open Energy Info (EERE)

    Line Plan of Development Outline Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Power Line Plan of Development OutlineLegal...

  10. Develop A Clean Energy Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Develop A Clean Energy Plan Develop A Clean Energy Plan clean_energy_strategy_icon.png Comprehensive strategic energy planning, both at the state and local levels, is a critical foundation for sound energy management and advancing a clean energy economy in your jurisdiction. A strategic energy plan is not a static document, but rather a long-term blueprint to focus and guide efforts and actions toward a defined energy vision. A comprehensive energy plan can address multiple factors, including

  11. Laboratory Directed Research and Development Plan - FY2013 |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Directed Research and Development Plan - FY2013 Document Number: NA Effective Date: 102014 File (public): PDF icon planldrdfy...

  12. Neutral-beam development plan, FY 1982-1987

    SciTech Connect (OSTI)

    Not Available

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables. (MOW)

  13. DOE's Tribal Energy Program Pathways to Energy Development &...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning * Creating a roadmap Feasibility Study * Possible roads to the ... Plan * Putting it all together (The Roadmap) Strategic Energy Planning Identify and ...

  14. International Assistance for Low-Emission Development Planning...

    Open Energy Info (EERE)

    Low-Emission Development Planning: CLEAN Inventory of Activities and Tools-Preliminary Trends Jump to: navigation, search International Assistance for Low-Emission Development...

  15. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    SciTech Connect (OSTI)

    King, D.A.

    1994-11-10

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan.

  16. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  17. Individual Development Plan (IDP) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    made at the organizational and departmental ... project management, strategic planning, etc.) as well as ... required for effective performance in that job. ...

  18. Planning For Energy Development: Renewable Energy Demonstration...

    Energy Savers [EERE]

    March 24, 2014 Strategic Energy Plan - DOE First Steps Program Renewable Energy Demonstration Center Concept Mecca, CA Awardee: Cabazon Band of Mission Indians Chairman: Douglas ...

  19. Chemical sensors technology development planning workshop

    SciTech Connect (OSTI)

    Bastiaans, G.J.; Haas, W.J. Jr.; Junk, G.A.

    1993-03-01

    The workshop participants were asked to: (1) Assess the current capabilities of chemical sensor technologies for addressing US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) needs; (2) Estimate potential near term (one to two years) and intermediate term (three to five years) capabilities for addressing those needs; and (3) Generate a ranked list of specific recommendations on what research and development (R&D) should be funded to provide the necessary capabilities. The needs were described in terms of two pervasive EM problems, the in situ determination of chlorinated volatile organic compounds (VOCs), and selected metals in various matrices at DOE sites. The R&D recommendations were to be ranked according to the estimated likelihood that the product technology will be ready for application within the time frame it is needed and the estimated return on investment. The principal conclusions and recommendations of the workshop are as follows: Chemical sensors capable of in situ determinations can significantly reduce analytical costs; Chemical sensors have been developed for certain VOCs in gases and water but none are currently capable of in situ determination of VOCs in soils; The DOE need for in situ determination of metals in soils cannot be addressed with existing chemical sensors and the prospects for their availability in three to five years are uncertain; Adaptation, if necessary, and field application of laboratory analytical instruments and those few chemical sensors that are already in field testing is the best approach for the near term; The chemical sensor technology development plan should include balanced support for near- and intermediate-term efforts.

  20. GSG-GIS development program plan

    SciTech Connect (OSTI)

    Lee, R.C.

    1992-10-15

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS).

  1. Multi-Year Research, Development, and Demonstration Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The cover of the Geothermal Multi-Year Research, Development and Demonstration Plan showing a photograph of a geothermal power plant. The Geothermal Technologies Office (GTO) ...

  2. Community Greening: How to Develop a Strategic Plan | Open Energy...

    Open Energy Info (EERE)

    Focus Area People and Policy Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback,...

  3. ALASKA ENERGY AUTHORITY Alaska Geothermal Development: A Plan...

    Open Energy Info (EERE)

    ALASKA ENERGY AUTHORITY Alaska Geothermal Development: A Plan Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: ALASKA ENERGY AUTHORITY Alaska Geothermal...

  4. Climate Compatible Development Tools: A guide for national planning...

    Open Energy Info (EERE)

    Resource Type: Guidemanual Website: www.climateplanning.orguserguide Cost: Free Language: English Climate Compatible Development Tools: A guide for national planning...

  5. Low Carbon Development: Planning & Modelling Course | Open Energy...

    Open Energy Info (EERE)

    & Modelling Course Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Low Carbon Development: Planning & Modelling Course AgencyCompany Organization: World Bank...

  6. NASA Benchmarks Lessons Learned Assessment Plan - Developed By...

    Broader source: Energy.gov (indexed) [DOE]

    NASA BENCHMARKS LESSONS LEARNED Assessment Plan Developed By NNSANevada Site Office Facility Representative Division Performance Objective: Management should have an established...

  7. How to Develop A Strategic Energy Plan | Open Energy Information

    Open Energy Info (EERE)

    Area: Renewable Energy, Energy Efficiency Topics: Implementation Resource Type: Guidemanual Website: www.nrel.govanalysispdfs45652.pdf How to Develop A Strategic Energy Plan...

  8. Prosper Sustainably Webinar: Developing and Implementing a Strategic Plan

    Broader source: Energy.gov [DOE]

    Hosted by Prosper Sustainably, this webinar will cover how to develop and implement a strategic plan. Guest speaker Josh Simmons will describe the elements and process of developing and...

  9. Climate adaptation planning in practice: an evaluation of adaptation plans from three developed nations

    SciTech Connect (OSTI)

    Preston, Benjamin L; Westaway, Richard M.; Yuen, Emma J.

    2011-04-01

    Formal planning for climate change adaptation is emerging rapidly at a range of geo-political scales. This first generation of adaptation plans provides useful information regarding how institutions are framing the issue of adaptation and the range of processes that are recognized as being part of an adaptation response. To better understand adaptation planning among developed nations, a set of 57 adaptation plans from Australia, the United Kingdom and the United States was evaluated against a suite of 19 planning processes identified from existing guidance instruments for adaptation planning. Total scores among evaluated plans ranged from 16% of the maximum possible score to 61%, with an average of 37%. These results suggest adaptation plans are largely under-developed. Critical weaknesses in adaptation planning are related to limited consideration for non-climatic factors as well as neglect for issues of adaptive capacity including entitlements to various forms of capital needed for effective adaptation. Such gaps in planning suggest there are opportunities for institutions to make better use of existing guidance for adaptation planning and the need to consider the broader governance context in which adaptation will occur. In addition, the adaptation options prescribed by adaptation plans reflect a preferential bias toward low-risk capacity-building (72% of identified options) over the delivery of specific actions to reduce vulnerability. To the extent these findings are representative of the state of developed nation adaptation planning, there appear to be significant deficiencies in climate change preparedness, even among those nations often assumed to have the greatest adaptive capacity.

  10. Title 24 Chapter 117 Municipal and Regional Planning and Development...

    Open Energy Info (EERE)

    Title 24 Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24...

  11. Title 24 Chapter 117 Municipal Planning and Development | Open...

    Open Energy Info (EERE)

    Title 24 Chapter 117 Municipal Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24 Chapter 117...

  12. Develop an Institutional Change Action Plan for Sustainability

    Broader source: Energy.gov [DOE]

    After establishing a goal and assessing the rules, roles, and tools, federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals).

  13. ITEP Developing Tribal Integrated Solid Waste Management Plans

    Broader source: Energy.gov [DOE]

    The Institute for Tribal Environmental Professionals (ITEP) is offering a two-day training course providing the tools tribes needs to develop and implement a successful tribal integrated solid waste management plan.

  14. Solar Energy Plan of Development Outline | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Solar Energy Plan of Development OutlineLegal Published NA Year Signed or Took Effect 2012...

  15. Strategic Energy Planning and Project Development Technical Assistance

    Broader source: Energy.gov [DOE]

    Technical experts from DOE and its national laboratories, along with other partnering organizations, provide up to 40 hours per year of in-depth support to assist tribes and Alaska Native villages with strategic energy planning and project development.

  16. Institutional Change Process Step 3: Develop an Action Plan

    Broader source: Energy.gov [DOE]

    After establishing a goal and assessing the rules, roles, and tools, federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals).

  17. DOE Announces Webinars on Energy Planning for Tribal Economic Development

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Water Efficiency and Energy Savings | Department of Energy Planning for Tribal Economic Development and Water Efficiency and Energy Savings DOE Announces Webinars on Energy Planning for Tribal Economic Development and Water Efficiency and Energy Savings January 25, 2016 - 8:30am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free;

  18. VULCAN celebrates completion and develops future plans (Journal Article) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect VULCAN celebrates completion and develops future plans Citation Details In-Document Search Title: VULCAN celebrates completion and develops future plans No abstract prepared. Authors: Ekkebus, Allen E [1] + Show Author Affiliations ORNL Publication Date: 2010-01-01 OSTI Identifier: 988719 DOE Contract Number: DE-AC05-00OR22725 Resource Type: Journal Article Resource Relation: Journal Name: Neutron News; Journal Volume: 21; Journal Issue: 3 Research Org: Oak Ridge National

  19. Fuel Fabrication Capability Research and Development Plan

    SciTech Connect (OSTI)

    Senor, David J.; Burkes, Douglas

    2013-06-28

    The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative (GTRI) Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors.

  20. Strategic Plan for Light Water Reactor Research and Development

    SciTech Connect (OSTI)

    2004-02-01

    The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R&D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R&D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R&D that addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually.

  1. Summary, Long-Term Nuclear Technology Research and Development Plan |

    Energy Savers [EERE]

    Department of Energy Summary, Long-Term Nuclear Technology Research and Development Plan Summary, Long-Term Nuclear Technology Research and Development Plan In 1998, DOE established the Nuclear Energy Research Advisory Committee (NERAC) to provide advice to the Secretary and to the Director, Office of Nuclear Energy, Science, and Technology (NE), on the broad range of non-defense DOE nuclear technology programs. The NERAC recommended development of a long-range R&D program. This R&D

  2. Final Report - Development of a Strategic Energy Plan

    SciTech Connect (OSTI)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  3. Geothermal resource area 9: Nye County. Area development plan

    SciTech Connect (OSTI)

    Pugsley, M.

    1981-01-01

    Geothermal Resource area 9 encompasses all of Nye County, Nevada. Within this area there are many different known geothermal sites ranging in temperature from 70/sup 0/ to over 265/sup 0/ F. Fifteen of the more major sites have been selected for evaluation in this Area Development Plan. Various potential uses of the energy found at each of the resource sites discussed in this Area Development Plan were determined after evaluating the area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities, and comparing those with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 15 geothermal sites considered in this Area Development Plan are summarized.

  4. Plutonium Focus Area research and development plan. Revision 1

    SciTech Connect (OSTI)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  5. Developing The Organized Village of Kasaan's Strategic Energy Plan

    SciTech Connect (OSTI)

    Hamar Glenn P

    2013-02-19

    The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe’s blueprint for creating long term energy self‐sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both “supply‐side” options of the development of sustainable energy sources, as well as “demand-side” options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

  6. Develop Plan for Analysis of the Effluent from GCM Production.

    SciTech Connect (OSTI)

    Nenoff, Tina M.; Mowry, Curtis D.

    2015-08-24

    This milestone is focused on developing a plan for the analysis of the effluent from the Sandia low temperature sintering Bi-Si-Zn oxide glass composite material (GCM) waste form for the long term storage of iodine and its capture materials.

  7. Metis Hub: The Development of an Intuitive Project Planning System

    SciTech Connect (OSTI)

    McConnell, Rachael M.

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  8. New Pathway Developed to Silicon Quantum Dot Devices (Fact Sheet...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory (NREL) and the University of Minnesota have developed a method for preparing ... Image by Lance Wheeler, University of Minnesota Key Research Results Achievement A method ...

  9. BETO Announces Notice of Intent (NOI) to Develop Pathways to Biofuels and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bioproducts | Department of Energy Notice of Intent (NOI) to Develop Pathways to Biofuels and Bioproducts BETO Announces Notice of Intent (NOI) to Develop Pathways to Biofuels and Bioproducts December 22, 2015 - 2:38am Addthis The Energy Department announces its intent to issue, on behalf of the Bioenergy Technologies Office (BETO), a funding opportunity announcement (FOA) entitled "MEGA-BIO: Bioproducts to Enable Biofuels." This FOA supports BETO's goal of meeting its 2022 cost

  10. 2016 Tribal Webinar Series: Energy Planning for Tribal Economic Development

    Energy Savers [EERE]

    Services Professionals (AESP) Southeast Conference | Department of Energy 2016 Southeast Energy Efficiency Alliance (SEEA) and Association of Energy Services Professionals (AESP) Southeast Conference 2016 Southeast Energy Efficiency Alliance (SEEA) and Association of Energy Services Professionals (AESP) Southeast Conference October 25, 2016 9:00AM EDT to October 26

    Energy Planning for Tribal Economic Development January 27, 2016 11:00 am - 12:30 PM MST Tribal Energy Development Operation

  11. GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN

    SciTech Connect (OSTI)

    CANTRELL KJ; CONNELLY MP

    2010-03-09

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  12. Vitrification development plan for US Department of Energy mixed wastes

    SciTech Connect (OSTI)

    Peters, R.; Lucerna, J.; Plodinec, M.J.

    1993-10-01

    This document is a general plan for conducting vitrification development for application to mixed wastes owned by the US Department of Energy. The emphasis is a description and discussion of the data needs to proceed through various stages of development. These stages are (1) screening at a waste site to determine which streams should be vitrified, (2) waste characterization and analysis, (3) waste form development and treatability studies, (4) process engineering development, (5) flowsheet and technical specifications for treatment processes, and (6) integrated pilot-scale demonstration. Appendices provide sample test plans for various stages of the vitrification development process. This plan is directed at thermal treatments which produce waste glass. However, the study is still applicable to the broader realm of thermal treatment since it deals with issues such as off-gas characterization and waste characterization that are not necessarily specific to vitrification. The purpose is to provide those exploring or considering vitrification with information concerning the kinds of data that are needed, the way the data are obtained, and the way the data are used. This will provide guidance to those who need to prioritize data needs to fit schedules and budgets. Knowledge of data needs also permits managers and planners to estimate resource requirements for vitrification development.

  13. Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

    Broader source: Energy.gov [DOE]

    Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

  14. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Broader source: Energy.gov [DOE]

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  15. Opportunities to change development pathways toward lower greenhouse gas emissions through energy efficiency

    SciTech Connect (OSTI)

    Alterra, Swart; Masanet, Eric; Lecocq, Franck; Najam, Adil; Schaeffer, Robert; Winkler, Harald; Sathaye, Jayant

    2008-07-04

    There is a multiplicity of development pathways in which low energy sector emissions are not necessarily associated with low economic growth. However, changes in development pathways can rarely be imposed from the top. On this basis, examples of energy efficiency opportunities to change development pathways toward lower emissions are presented in this paper. We review opportunities at the sectoral and macro level. The potential for action on nonclimate policies that influence energy use and emissions are presented. Examples are drawn from policies already adopted and implemented in the energy sector. The paper discusses relationships between energy efficiency policies and their synergies and tradeoffs with sustainable development and greenhouse gas emissions. It points to ways that energy efficiency could be mainstreamed into devel?opment choices.

  16. Tribal Leader Forum Kathy Ahsing Director, Planning and Development

    Energy Savers [EERE]

    of the Army (Installations, Energy & Environment) Tribal Leader Forum Kathy Ahsing Director, Planning and Development 31 May 2013 Assistant Secretary of the Army (Installations, Energy & Environment) * Today's military installations are playing an ever increasing role in energy security. - Installations are also playing an increased role in disaster and other community relief efforts Army Installations' Changing Roles * Installations are increasingly susceptible to a fragile electrical

  17. Strategic Energy Planning, Project Development and the Importance of Champions

    Energy Savers [EERE]

    Roger Taylor Group Manager State, Local & Tribal Initiatives November 18, 2009 Strategic Energy Planning, Project Development and the Importance of Champions Renewable Resource Options Geothermal Biomass Solar Hydro Wind National Renewable Energy Laboratory Innovation for Our Energy Future Power Direct Use PV - Remote Homes Direct Use Buildings Stock Watering Big Wind Small Wind Small Hydro Biomass Heat, Power & Fuels Diesel Hybrids Power Direct Use PV - Remote Homes CS Power & Heat

  18. Developing the Organized Village of Kasaan's Tribal Energy Plan

    Energy Savers [EERE]

    the Organized Village of Kasaan's Tribal Energy Plan Kasaan, Alaska Principal Investigator: Glenn "Stormy" Hamar The Organized Village of Kasaan is committed to promoting, preserving, and protecting indigenous Haida identity and values. For our elders and youth, we look to the future in unity, by developing economic opportunities, promoting education, and utilizing our cultural, natural, and social resources. The Organized Village of Kasaan has a long range vision of being

  19. Environmental development plan for transportation programs: FY80 update

    SciTech Connect (OSTI)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  20. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    SciTech Connect (OSTI)

    Moe, Wayne Leland

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

  1. Deep-Burn Modular Helium Reactor Fuel Development Plan

    SciTech Connect (OSTI)

    McEachern, D

    2002-12-02

    This document contains the workscope, schedule and cost for the technology development tasks needed to satisfy the fuel and fission product transport Design Data Needs (DDNs) for the Gas Turbine-Modular Helium Reactor (GT-MHR), operating in its role of transmuting transuranic (TRU) nuclides in spent fuel discharged from commercial light-water reactors (LWRs). In its application for transmutation, the GT-MHR is referred to as the Deep-Burn MHR (DB-MHR). This Fuel Development Plan (FDP) describes part of the overall program being undertaken by the U.S. Department of Energy (DOE), utilities, and industry to evaluate the use of the GT-MHR to transmute transuranic nuclides from spent nuclear fuel. The Fuel Development Plan (FDP) includes the work on fuel necessary to support the design and licensing of the DB-MHR. The FDP is organized into ten sections. Section 1 provides a summary of the most important features of the plan, including cost and schedule information. Section 2 describes the DB-MHR concept, the features of its fuel and the plan to develop coated particle fuel for transmutation. Section 3 describes the knowledge base for fabrication of coated particles, the experience with irradiation performance of coated particle fuels, the database for fission product transport in HTGR cores, and describes test data and calculations for the performance of coated particle fuel while in a repository. Section 4 presents the fuel performance requirements in terms of as-manufactured quality and performance of the fuel coatings under irradiation and accident conditions. These requirements are provisional because the design of the DB-MHR is in an early stage. However, the requirements are presented in this preliminary form to guide the initial work on the fuel development. Section 4 also presents limits on the irradiation conditions to which the coated particle fuel can be subjected for the core design. These limits are based on past irradiation experience. Section 5 describes the Design Data Needs to: (1) fabricate the coated particle fuel, (2) predict its performance in the reactor core, (3) predict the radionuclide release rates from the reactor core, and (4) predict the performance of spent fuel in a geological repository. The heart of this fuel development plan is Section 6, which describes the development activities proposed to satisfy the DDNs presented in Section 5. The development scope is divided into Fuel Process Development, Fuel Materials Development, Fission Product Transport, and Spent Fuel Disposal. Section 7 describes the facilities to be used. Generally, this program will utilize existing facilities. While some facilities will need to be modified, there is no requirement for major new facilities. Section 8 states the Quality Assurance requirements that will be applied to the development activities. Section 9 presents detailed costs organized by WBS and spread over time. Section 10 presents a list of the types of deliverables that will be prepared in each of the WBS elements. Four Appendices contain supplementary information on: (a) design data needs, (b) the interface with the separations plant, (c) the detailed development schedule, and (d) the detailed cost estimate.

  2. Institutional Change Process Step 3: Develop an Action Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3: Develop an Action Plan Institutional Change Process Step 3: Develop an Action Plan Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Process for Continuous Change After establishing goals and assessing the rules, roles, and tools, you can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and

  3. National Energy Audit Tool for Multifamily Buildings Development Plan

    SciTech Connect (OSTI)

    Malhotra, Mini; MacDonald, Michael; Accawi, Gina K; New, Joshua Ryan; Im, Piljae

    2012-03-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional development in the future is expected to be needed if more capabilities are to be added. A rough schedule for development of the version 1 tool is presented. The components and capabilities described in this plan will serve as the starting point for development of the proposed new multifamily energy audit tool for WAP.

  4. Transcriptomic analysis in the developing zebrafish embryo after compound exposure: Individual gene expression and pathway regulation

    SciTech Connect (OSTI)

    Hermsen, Sanne A.B.; Pronk, Tessa E.; Brandhof, Evert-Jan van den; Ven, Leo T.M. van der; Piersma, Aldert H.

    2013-10-01

    The zebrafish embryotoxicity test is a promising alternative assay for developmental toxicity. Classically, morphological assessment of the embryos is applied to evaluate the effects of compound exposure. However, by applying differential gene expression analysis the sensitivity and predictability of the test may be increased. For defining gene expression signatures of developmental toxicity, we explored the possibility of using gene expression signatures of compound exposures based on commonly expressed individual genes as well as based on regulated gene pathways. Four developmental toxic compounds were tested in concentration-response design, caffeine, carbamazepine, retinoic acid and valproic acid, and two non-embryotoxic compounds, D-mannitol and saccharin, were included. With transcriptomic analyses we were able to identify commonly expressed genes, which were mostly development related, after exposure to the embryotoxicants. We also identified gene pathways regulated by the embryotoxicants, suggestive of their modes of action. Furthermore, whereas pathways may be regulated by all compounds, individual gene expression within these pathways can differ for each compound. Overall, the present study suggests that the use of individual gene expression signatures as well as pathway regulation may be useful starting points for defining gene biomarkers for predicting embryotoxicity. - Highlights: The zebrafish embryotoxicity test in combination with transcriptomics was used. We explored two approaches of defining gene biomarkers for developmental toxicity. Four compounds in concentration-response design were tested. We identified commonly expressed individual genes as well as regulated gene pathways. Both approaches seem suitable starting points for defining gene biomarkers.

  5. Solar Market Pathways

    Broader source: Energy.gov [DOE]

    The Solar Market Pathways website distributes key insights from 15 SunShot Initiative projects that are advancing solar deployment across the United States. These projects take a variety of approaches to develop actionable strategic plans to expand solar electricity use for residential, community, and commercial properties.

  6. Solar Market Pathways Website

    Broader source: Energy.gov [DOE]

    The Solar Market Pathways website distributes key insights from 15 SunShot Initiative projects that are advancing solar deployment across the United States. These projects take a variety of approaches to develop actionable strategic plans to expand solar electricity use for residential, community, and commercial properties.

  7. U.S and Russia Develop Action Plan to Enhance Global and Bilateral...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy ...

  8. Transcript of Tribal Energy and Economic Webinar: Energy Planning for Tribal Economic Development

    Broader source: Energy.gov [DOE]

    Transcript for the Tribal Energy and Economic Webinar: Energy Planning for Tribal Economic Development held on Jan. 27, 2016.

  9. Light Water Reactor Sustainability Program Reactor Safety Technologies Pathway Technical Program Plan

    SciTech Connect (OSTI)

    Corradini, M. L.

    2015-06-01

    In the aftermath of the March 2011 multi-unit accident at the Fukushima Daiichi nuclear power plant (Fukushima), the nuclear community has been reassessing certain safety assumptions about nuclear reactor plant design, operations and emergency actions, particularly with respect to extreme events that might occur and that are beyond each plant’s current design basis. Because of our significant domestic investment in nuclear reactor technology (99 operating reactors in the fleet of commercial LWRs with five under construction), the United States has been a major leader internationally in these activities. The U.S. nuclear industry is voluntarily pursuing a number of additional safety initiatives. The NRC continues to evaluate and, where deemed appropriate, establish new requirements for ensuring adequate protection of public health and safety in the occurrence of low probability events at nuclear plants; (e.g., mitigation strategies for beyond design basis events initiated by external events like seismic or flooding initiators). The DOE has also played a major role in the U.S. response to the Fukushima accident. Initially, DOE worked with the Japanese and the international community to help develop a more complete understanding of the Fukushima accident progression and its consequences, and to respond to various safety concerns emerging from uncertainties about the nature of and the effects from the accident. DOE R&D activities are focused on providing scientific and technical insights, data, analyses methods that ultimately support industry efforts to enhance safety. These activities are expected to further enhance the safety performance of currently operating U.S. nuclear power plants as well as better characterize the safety performance of future U.S. plants. In pursuing this area of R&D, DOE recognizes that the commercial nuclear industry is ultimately responsible for the safe operation of licensed nuclear facilities. As such, industry is considered the primary “end user” of the results from this DOE-sponsored work. The response to the Fukushima accident has been global, and there is a continuing multinational interest in collaborations to better quantify accident consequences and to incorporate lessons learned from the accident. DOE will continue to seek opportunities to facilitate collaborations that are of value to the U.S. industry, particularly where the collaboration provides access to vital data from the accident or otherwise supports or leverages other important R&D work. The purpose of the Reactor Safety Technology R&D is to improve understanding of beyond design basis events and reduce uncertainty in severe accident progression, phenomenology, and outcomes using existing analytical codes and information gleaned from severe accidents, in particular the Fukushima Daiichi events. This information will be used to aid in developing mitigating strategies and improving severe accident management guidelines for the current light water reactor fleet.

  10. Hydrogen Posture Plan: An Integrated Research, Development and...

    Broader source: Energy.gov (indexed) [DOE]

    06 Hydrogen Posture Plan satisfies Section 804 of the Energy Policy Act of 2005, which requires that the Secretary of Energy transmit to Congress a coordinated plan for the...

  11. Multi-Year SSL Market Development Support Plan

    SciTech Connect (OSTI)

    Ledbetter, Marc R.

    2012-05-01

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will work closely with lighting industry organizations 'such as the Next Generation Lighting Industry Alliance, North American Illuminating Engineering Society, and the International Association of Lighting Designers' and with other government programs seeking to improve lighting energy efficiency. While DOE will work closely with these organizations and others from lighting and electric utility industry, the program will focus primarily on assisting buyers of SSL products and others acting on their behalf because satisfied buyers are essential to the success of SSL market adoption. The work product of DOE's efforts will primarily be information, of the right type, at the right time, and provided efficiently to those who can best use it. A secondary work product of DOE's program will be market opportunities, in which DOE will seek to reduce the risks and costs for manufacturers of SSL products to sell good quality, high performance products to motivated buyers. In short, DOE plans to implement a multi-year program that produces highly useful and widely available information for buyers and their agents, while producing important market opportunities for producers, avoids the mistakes of the past, and is closely coordinated with industry and government. The market needs and the overall strategy were used for deciding which types of programs and projects DOE should create, and what general form they should take. Progress toward achieving plan goals with the above program elements will be monitored and periodically reported.

  12. Advanced High-Level Waste Glass Research and Development Plan

    SciTech Connect (OSTI)

    Peeler, David K.; Vienna, John D.; Schweiger, Michael J.; Fox, Kevin M.

    2015-07-01

    The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al2O3, Cr2O3, SO3 and Na2O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.

  13. Evaluation of field development plans using 3-D reservoir modelling

    SciTech Connect (OSTI)

    Seifert, D.; Lewis, J.J.M.; Newbery, J.D.H.

    1997-08-01

    Three-dimensional reservoir modelling has become an accepted tool in reservoir description and is used for various purposes, such as reservoir performance prediction or integration and visualisation of data. In this case study, a small Northern North Sea turbiditic reservoir was to be developed with a line drive strategy utilising a series of horizontal producer and injector pairs, oriented north-south. This development plan was to be evaluated and the expected outcome of the wells was to be assessed and risked. Detailed analyses of core, well log and analogue data has led to the development of two geological {open_quotes}end member{close_quotes} scenarios. Both scenarios have been stochastically modelled using the Sequential Indicator Simulation method. The resulting equiprobable realisations have been subjected to detailed statistical well placement optimisation techniques. Based upon bivariate statistical evaluation of more than 1000 numerical well trajectories for each of the two scenarios, it was found that the wells inclinations and lengths had a great impact on the wells success, whereas the azimuth was found to have only a minor impact. After integration of the above results, the actual well paths were redesigned to meet external drilling constraints, resulting in substantial reductions in drilling time and costs.

  14. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

  15. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    P. E. MacDonald

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

  16. Energy Technology Roadmaps: A Guide to Development and Implementation...

    Open Energy Info (EERE)

    Topics: Low emission development planning, Pathways analysis Resource Type: Guidemanual, Lessons learnedbest practices Website: www.iea.orgpapersroadmapsguide.pdf Energy...

  17. CDKN-Green Growth: Implications for Development Planning | Open...

    Open Energy Info (EERE)

    of national and local stakeholders. Planners rarely find the planning process straightforward and rely on economic principles and tools to inform the process. Conventional...

  18. ORISE: ORISE to develop needs assessment plan to support CDC...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Education (ORISE) will design and carry out a needs assessment plan for the Center for Disease Control and Prevention's (CDC) Advanced Molecular Detection and Response to ...

  19. Institutional Change Process Step 3: Develop an Action Plan ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    will be implemented over time to achieve and maintain energy and sustainability goals). ... Remember that planning useful efficiency and sustainability evaluation is necessary before ...

  20. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Coordination

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  1. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  2. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Appendices

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Introduction

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Foreword

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  5. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Analysis

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  6. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Systems Integration

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  7. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  8. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Management

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  9. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Executive Summary

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  10. Guidance for Developing and Implementing Long-Term Surveillance Plans for

    Energy Savers [EERE]

    UMTRCA Title I and Title II Disposal Sites | Department of Energy Guidance for Developing and Implementing Long-Term Surveillance Plans for UMTRCA Title I and Title II Disposal Sites Guidance for Developing and Implementing Long-Term Surveillance Plans for UMTRCA Title I and Title II Disposal Sites Guidance for Developing and Implementing Long-Term Surveillance Plans for UMTRCA Title I and Title II Disposal Sites (November 2012) PDF icon Guidance for Developing and Implementing Long-Term

  11. Tribal Renewable Energy Webinar: Energy Planning for Tribal Economic Development

    Broader source: Energy.gov [DOE]

    Learn about tools and resources to establish a clean, diverse, and affordable energy plan based on energy efficiency and wise use of renewable resources, with maximum local control and ownership of energy issues.

  12. Next Generation Nuclear Plant Materials Research and Development Program Plan

    SciTech Connect (OSTI)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for managing the R&D program elements; (2) Developing a specific work package for the R&D activities to be performed during each government fiscal year; (3) Reporting the status and progress of the work based on committed deliverables and milestones; (4) Developing collaboration in areas of materials R&D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and (5) Ensuring that the R&D work performed in support of the materials program is in conformance with established Quality Assurance and procurement requirements. The objective of the NGNP Materials R&D Program is to provide the essential materials R&D needed to support the design and licensing of the reactor and balance of plant, excluding the hydrogen plant. The materials R&D program is being initiated prior to the design effort to ensure that materials R&D activities are initiated early enough to support the design process and support the Project Integrator. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge; thus, new materials and approaches may be required.

  13. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  14. Environmental Guidelines for Development of Cultural Resource Management Plans--Update

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-09-22

    This Guide provides guidelines for the development of an individual Cultural Resource Management Plan for each DOE facility and program. Canceled by DOE N 251.82.

  15. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    none,

    2009-02-01

    This 2008 Multi-Year Research, Development, and Demonstration Program Plan covers the 2009-2015 period with program activities to 2025.

  16. CfRN-Developing a Low Carbon Growth Plan | Open Energy Information

    Open Energy Info (EERE)

    Topics: GHG inventory, Low emission development planning Resource Type: Guidemanual, Lessons learnedbest practices, Publications Website: www.rainforestcoalition.org CfRN Low...

  17. Solar Market Pathways | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Market Pathways Solar Market Pathways The Solar Market Pathways program supports 15 SunShot projects that are advancing solar deployment across the United States. These projects take a variety of approaches to develop actionable strategic plans to expand solar electricity use for residential, community, and commercial properties. Awardees use a wide range of tools, including special financing mechanisms like commercial property assessed clean energy, and the integration of solar energy

  18. Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)

    Broader source: Energy.gov [DOE]

    This guide provides an overview of strategic electricity planning for communities, using a step-by-step approach to develop the plan. This method has a high chance of success, because it is based on stakeholder buy-in and political commitment. Not all communities will need to follow all steps, but the process is designed to incorporate all parties, maximize solution-based thinking, and develop a plan that can be carried out by community leaders.

  19. Title 43 CFR 1610.4-2 Development of Planning Criteria | Open...

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1610.4-2 Development of Planning CriteriaLegal Abstract 1610.4-2 Development of...

  20. Strengthening Planning Capacity for Low Carbon Growth in Developing...

    Open Energy Info (EERE)

    Growth in Developing Asia AgencyCompany Organization Asian Development Bank Partner Japan, United Kingdom Sector Climate, Energy Focus Area Non-renewable Energy, Buildings,...

  1. Advanced LWR Nuclear Fuel Development

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Instrumentation, Information, and Control Systems ... and Scope * Develop the fundamental scientific basis to ... the plan to deliver on the vision of the pathway. * Strategy ...

  2. Guidelines for Process and Development of Annual HAB Work Plan - DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - DRAFT 5/19/15 Assumptions:  Board members (through committees) identify their priority work plan topics for the upcoming fiscal year.  TPA agencies present proposed work plan topics at the annual Leadership Workshop, defining key priorities and issues on which policy-level advice from the Board would be of most benefit. Using the TPA priorities as a framework, agency representatives and EIC members collaboratively develop a draft work plan. Additional HAB priorities are discussed and

  3. Climate Information for Development Needs: An Action Plan for...

    Open Energy Info (EERE)

    Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property. Climate Information for Development...

  4. Health impact assessment in planning: Development of the design for health HIA tools

    SciTech Connect (OSTI)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-15

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  5. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect (OSTI)

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  6. Title 10 Chapter 151 State Land Use and Development Plans | Open...

    Open Energy Info (EERE)

    Title 10 Chapter 151 State Land Use and Development Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 10 Chapter 151...

  7. 24 V.S.A. Chapter 117 Municipal and Regional Planning and Development...

    Open Energy Info (EERE)

    4 V.S.A. Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 24 V.S.A....

  8. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  9. Clean coal technologies: Research, development, and demonstration program plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

  10. Guidelines for Process and Development of Annual HAB Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Certifications Guidelines for Home Energy Professionals Certifications As part of the Guidelines for Home Energy Professionals project, the U.S. Department of Energy (DOE) collaborated with trainers and technicians from across the home performance industry to develop high-quality, nationally recognized professional certifications. Learn more about the certification blueprint, how to get certified, and resources for training centers below. Certification Blueprint The new certifications

  11. National climate change action plans: Interim report for developing and transition countries

    SciTech Connect (OSTI)

    Benioff, R.; Ness, E.; Hirst, J.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  12. Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-06-24

    The Rotary Mode Core Sampling Trucks (RMSCTs) currently use a multi-sectioned bellows between the grapple box and the quill rod to compensate for drill head motion and to provide a path for purge gas. The current bellows, which is detailed on drawing H-2-690059, is expensive to procure, has a lengthy procurement cycle, and is prone to failure. Therefore, a task has been identified to design, fabricate, and install a replacement bellows. This Engineering Task Plan (ETP) is the management plan document for accomplishing the identified tasks. Any changes in scope of the ETP shall require formal direction by the Characterization Engineering manager. This document shall also be considered the work planning document for developmental control per Development Control Requirements (HNF 1999a). This Engineering Task Plan (ETP) is the management plan document for accomplishing the design, fabrication, and installation of a replacement bellows assembly for the Rotary Mode Core Sampling Trucks 3 and 4 (RMCST).

  13. Geothermal resource area 11, Clark County area development plan

    SciTech Connect (OSTI)

    Pugsley, M.

    1981-01-01

    Geothermal Resource Area 11 includes all of the land in Clark County, Nevada. Within this area are nine geothermal anomalies: Moapa Area, Las Vegas Valley, Black Canyon, Virgin River Narrows, Roger's Springs, Indian Springs, White Rock Springs, Brown's Spring, and Ash Creek Spring. All of the geothermal resources in Clark County have relatively low temperatures. The highest recorded temperature is 145{sup 0}F at Black Canyon. The temperatures of the other resources range from 70 to 90{sup 0}F. Because of the low temperature of the resources and, for the most part, the distance of the resources from any population base, the potential for the development of the resources are considered to be somewhat limited.

  14. Small modular reactor (SMR) development plan in Korea

    SciTech Connect (OSTI)

    Shin, Yong-Hoon Park, Sangrok; Kim, Byong Sup; Choi, Swongho; Hwang, Il Soon

    2015-04-29

    Since the first nuclear power was engaged in Korean electricity grid in 1978, intensive research and development has been focused on localization and standardization of large pressurized water reactors (PWRs) aiming at providing Korean peninsula and beyond with economical and safe power source. With increased priority placed on the safety since Chernobyl accident, Korean nuclear power R and D activity has been diversified into advanced PWR, small modular PWR and generation IV reactors. After the outbreak of Fukushima accident, inherently safe small modular reactor (SMR) receives growing interest in Korea and Europe. In this paper, we will describe recent status of evolving designs of SMR, their advantages and challenges. In particular, the conceptual design of lead-bismuth cooled SMR in Korea, URANUS with 40∼70 MWe is examined in detail. This paper will cover a framework of the program and a strategy for the successful deployment of small modular reactor how the goals would entail and the approach to collaboration with other entities.

  15. The advanced neutron source research and development plan

    SciTech Connect (OSTI)

    Selby, D.L.

    1995-08-01

    The Advanced Neutron Source (ANS) is being designed as a user-oriented neutron research laboratory centered around the most intense continuous beams of thermal and subthermal neutrons in the world (an order of magnitude more intense than beams available from the most advanced existing reactors). The ANS will be built around a new research reactor of 330-MW fission power, producing an unprecedented peak thermal flux of >7 {center_dot} 10{sup 19} {center_dot} m{sup -2} {center_dot} s{sup -1}. Primarily a research facility, the ANS will accommodate more than 1000 academic, industrial, and government researchers each year. They will conduct basic research in all branches of science as well as applied research leading to better understanding of new materials, including high temperature super conductors, plastics, and thin films. Some 48 neutron beam stations will be set up in the ANS beam rooms and the neutron guide hall for neutron scattering and for fundamental and nuclear physics research. There also will be extensive facilities for materials irradiation, isotope production, and analytical chemistry. The top level work breakdown structure (WBS) for the project. As noted in this figure, one component of the project is a research and development (R&D) program (WBS 1.1). This program interfaces with all of the other project level two WBS activities. Because one of the project guidelines is to meet minimum performance goals without relying on new inventions, this R&D activity is not intended to produce new concepts to allow the project to meet minimum performance goals. Instead, the R&D program will focus on the four objectives described.

  16. Waste Treatment Technology Process Development Plan For Hanford Waste Treatment Plant Low Activity Waste Recycle

    SciTech Connect (OSTI)

    McCabe, Daniel J.; Wilmarth, William R.; Nash, Charles A.

    2013-08-29

    The purpose of this Process Development Plan is to summarize the objectives and plans for the technology development activities for an alternative path for disposition of the recycle stream that will be generated in the Hanford Waste Treatment Plant Low Activity Waste (LAW) vitrification facility (LAW Recycle). This plan covers the first phase of the development activities. The baseline plan for disposition of this stream is to recycle it to the WTP Pretreatment Facility, where it will be concentrated by evaporation and returned to the LAW vitrification facility. Because this stream contains components that are volatile at melter temperatures and are also problematic for the glass waste form, they accumulate in the Recycle stream, exacerbating their impact on the number of LAW glass containers. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and reducing the halides in the Recycle is a key component of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, this stream does not have a proven disposition path, and resolving this gap becomes vitally important. This task seeks to examine the impact of potential future disposition of this stream in the Hanford tank farms, and to develop a process that will remove radionuclides from this stream and allow its diversion to another disposition path, greatly decreasing the LAW vitrification mission duration and quantity of glass waste. The origin of this LAW Recycle stream will be from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover or precipitates of scrubbed components (e.g. carbonates). The soluble components are mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet, and will not be available until the WTP begins operation, causing uncertainty in its composition, particularly the radionuclide content. This plan will provide an estimate of the likely composition and the basis for it, assess likely treatment technologies, identify potential disposition paths, establish target treatment limits, and recommend the testing needed to show feasibility. Two primary disposition options are proposed for investigation, one is concentration for storage in the tank farms, and the other is treatment prior to disposition in the Effluent Treatment Facility. One of the radionuclides that is volatile and expected to be in high concentration in this LAW Recycle stream is Technetium-99 ({sup 99}Tc), a long-lived radionuclide with a half-life of 210,000 years. Technetium will not be removed from the aqueous waste in the Hanford Waste Treatment and Immobilization Plant (WTP), and will primarily end up immobilized in the LAW glass, which will be disposed in the Integrated Disposal Facility (IDF). Because {sup 99}Tc has a very long half-life and is highly mobile, it is the largest dose contributor to the Performance Assessment (PA) of the IDF. Other radionuclides that are also expected to be in appreciable concentration in the LAW Recycle are {sup 129}I, {sup 90}Sr, {sup 137}Cs, and {sup 241}Am. The concentrations of these radionuclides in this stream will be much lower than in the LAW, but they will still be higher than limits for some of the other disposition pathways currently available. Although the baseline process will recycle this stream to the Pretreatment Facility, if the LAW facility begins operation first, this stream will not have a disposition path internal to WTP. One potential solution is to return the stream to the tank farms where it can be evaporated in the 242-A evaporator, or perhaps deploy an auxiliary evaporator to concentrate it prior to return to the tank farms. In either case, testing is needed to evaluat

  17. ORISE: ORISE to develop needs assessment plan to support CDC infectious

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    disease initiative to develop needs assessment plan to support CDC infectious disease initiative ORISE team will identify training and educational needs among laboratory professionals, bioinformatics professionals and epidemiologists How ORISE is Making a Difference The Oak Ridge Institute for Science and Education (ORISE) will design and carry out a needs assessment plan for the Center for Disease Control and Prevention's (CDC) Advanced Molecular Detection and Response to Infectious Disease

  18. Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year Research, Development, and Demonstration Plan Planned program activities for 2011-2020 Fuel Cell Technologies Office NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or

  19. Environmental planning as a tool for economic development: The black brook watershed experience

    SciTech Connect (OSTI)

    Ryner, P.C.; Heller, G.B.

    1995-12-01

    The Keene, New Hampshire Planning Department has attempted to use environmental planning as a tool to facilitate industrial development of the Black Brook Watershed. The City has established detailed modeling of drainage, floodplains and groundwater, and has placed that information on accurate computer-based maps. When provided to developers at the beginning of the development process, this environmental information expidites design and permitting while also improving the likelihood of protecting sensitive environmental areas. Starting in 1987 as part of a Master Plan revision process, the Planning Department decided to concentrate on the Black Brook Watershed in northwestern Keene as a target area for a new approach to economic development and environmental protection. The entire watershed was chosen as the boundary for this study area and detailed studies were conducted. During this effort the City formulated a new Economic Development Master Plan which called for the creation of approximately 300 acres of new industrial development within the next ten years. The Black Brook basin was identified as the preferred site. Because of pro-active environmental planning, the City is now able to work in active, cooperative partnership with the private sector in the development of this area. It is clear from this first specific development project that the project development and permitting process will be shortened by at least 60 days, and a minimum of $5,000 to $10,000 in preliminary site information costs will be saved. The availability of good information on wetlands and floodplains has already had a dramatic impact upon proposed site design and has achieved the desired objective of avoiding these sensitive areas whenever possible. The City is now working on the design of an Industrial Design and Permitting System which will be applied to the entire City, based upon what has been learned from this effort.

  20. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-11-30

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  1. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-05-15

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  2. U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Cooperation | Department of Energy S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation December 19, 2006 - 9:46am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman and Russian Federal Atomic Energy Agency (Rosatom) Director Sergey V. Kiriyenko last week submitted to U.S. President George W. Bush and Russian President Vladimir Putin a

  3. A long-term strategic plan for development of solar thermal electric technology

    SciTech Connect (OSTI)

    Williams, T.A.; Burch, G.; Chavez, J.M.; Mancini, T.R.; Tyner, C.E.

    1997-06-01

    Solar thermal electric (STE) technologies--parabolic troughs, power towers, and dish/engine systems--can convert sunlight into electricity efficiently and with minimum effect on the environment. These technologies currently range from developmental to early commercial stages of maturity. This paper summarizes the results of a recent strategic planning effort conducted by the US department of Energy (DOE) to develop a long-term strategy for the development of STE technologies. The planning team led by DOE included representatives from the solar thermal industry, domestic utilities, state energy offices, and Sun{center_dot}Lab (the cooperative Sandia National laboratories/National Renewable Energy Laboratory partnership that supports the STE Program) as well as project developers. The plan was aimed at identifying specific activities necessary to achieve the DOE vision of 20 gigawatts of installed STE capability by the year 2020. The planning team developed five strategies that both build on the strengths of, and opportunities for, STE technology and address weaknesses and threats. These strategies are to: support future commercial opportunities for STE technologies; demonstrate improved performance and reliability of STE components and systems; reduce STE energy costs; develop advanced STE systems and applications; and address nontechnical barriers and champion STE power. The details of each of these strategies are discussed.

  4. Development of a trial burn plan for a mixed waste fluidized bed incinerator

    SciTech Connect (OSTI)

    Kabot, F.J.; Ziegler, D.L.

    1988-01-01

    One of the more important elements of the incinerator permitting process under RCRA is the development of the Trial Burn Plan. This document describes the incinerator and defines the incinerator's process envelope within which the trial burns will be conducted. The data obtained during the trial burns will be the basis for the incinerator's operating permit. This paper describes the development of the Trial Burn Plan for a unique fluidized bed incinerator to be used for the incineration of hazardous and mixed wastes at the Department of Energy's Rocky Flats Plant. It describes a review process of the Trial Burn Plan involving a public comment period that actually preceded the trial burns. 2 refs., 1 fig.

  5. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    SciTech Connect (OSTI)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  6. Developing air quality goals and policies for long-range plans

    SciTech Connect (OSTI)

    Full, D.J.; Mitchell, D.

    1995-12-01

    Air Quality Guidelines for General Plans (Air Quality Guidelines) is a guidance document and resource for cities and counties to use to address air quality in their long-range planning efforts. It includes goals, policies, and programs that when adopted as part of a long-range plan will reduce vehicle trips and miles traveled and improve air quality. Although this is a voluntary program, the San Joaquin Valley Unified Air Pollution Control District (District) has strongly encouraged cities and counties in the San Joaquin Valley to use their land use and transportation planning authority to help achieve air quality goals by adopting the policies and programs suggested by the Air Quality Guidelines. Implementing the goals and policies will result in a win-win situation where cities, counties, and developers save money through more efficient land use and transportation systems and where the public benefits from a more livable community and better air quality. The purpose of the Air Quality Guidelines is threefold: (1) to provide local planning agencies with a comprehensive set of goals and policies that will improve air quality if adopted as part of a long-range plan; (2) to provide a guide to cities and counties for determining which goals and policies are appropriate in their particular community; and (3) to provide justification and rationale for the goals and policies that will convince decision-makers and the public that they are appropriate and necessary.

  7. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect (OSTI)

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  8. Clean energy for development investment framework: the World Bank Group action plan

    SciTech Connect (OSTI)

    2007-03-06

    In September 2005 the Development Committee requested the World Bank to develop an Investment Framework for Clean Energy and Development - in the context of the Gleneagles Communique on Climate Change, Clean Energy and Sustainable Development which was issued in July 2005. This Action Plan provides an update of work undertaken to date as well as actions planned by the World Bank Group (WBG) in support of the Clean Energy for Development Investment Framework (CEIF). The Action Plan relies on partnerships, including with the International Financial Institutions (IFIs) and the private sector. While it concentrates on maximizing and extending existing instruments, it provides for continued dialogue with governments and the private sector on new approaches to accelerate the transition to a low carbon economy. In addition to increased investments, the private sector has an important role to play in closing the investment gap in many countries. Projects such as Bujagali (Uganda), Nam Theun II (Laos) and China and India Thermal Power Plant Rehabilitation projects are examples of how partnerships with the private sector can work, both on financing but also on enhancing the overall regulatory framework for enhanced partnerships. The report was prepared for the 15 April 2007 Development Committee meeting, a joint committee of the Board of Governors of the World Bank and the International Monetary Fund on the transfer of real resources to developing countries. 3 figs., 3 tabs., 5 annexes.

  9. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect (OSTI)

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  10. Development and pilot demonstration program of a waste minimization plan at Argonne National Laboratory

    SciTech Connect (OSTI)

    Peters, R.W.; Wentz, C.A.; Thuot, J.R.

    1991-01-01

    In response to US Department of Energy directives, Argonne National Laboratory (ANL) has developed a waste minimization plan aimed at reducing the amount of wastes at this national research and development laboratory. Activities at ANL are primarily research- oriented and as such affect the amount and type of source reduction that can be achieved at this facility. The objective of ANL's waste minimization program is to cost-effectively reduce all types of wastes, including hazardous, mixed, radioactive, and nonhazardous wastes. The ANL Waste Minimization Plan uses a waste minimization audit as a systematic procedure to determine opportunities to reduce or eliminate waste. To facilitate these audits, a computerized bar-coding procedure is being implemented at ANL to track hazardous wastes from where they are generated to their ultimate disposal. This paper describes the development of the ANL Waste Minimization Plan and a pilot demonstration of the how the ANL Plan audited the hazardous waste generated within a selected divisions of ANL. It includes quantitative data on the generation and disposal of hazardous waste at ANL and describes potential ways to minimize hazardous wastes. 2 refs., 5 figs., 8 tabs.

  11. Evaluating the implementation of environmental review mitigation in local planning and development processes

    SciTech Connect (OSTI)

    Slotterback, Carissa Schively

    2008-11-15

    The implementation of mitigation strategies and outcomes of environmental review remains a challenge for planners and regulators. While the process and content of environmental review is clearly defined, there is often little attention to what happens after the review is completed. This paper presents the results of an evaluation of the implementation of the outcomes of environmental review, specifically mitigation measures designed to respond to environmental impacts identified in the environmental impact analysis. Drawing on previous evaluations of environmental review outcomes and plan implementation, the research provides a methodology for evaluating the implementation of mitigation efforts, points to the challenges associated with implementing the mitigation outcomes of local environmental review in planning and development processes, and identifies opportunities to integrate planning and environmental review processes.

  12. Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China

    SciTech Connect (OSTI)

    Song Guojun Zhou Li; Zhang Lei

    2011-11-15

    The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: > National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. > We propose a institutional framework to conduct strategic environmental assessment to NESDPs. > The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

  13. Pathway engineering and organism development for ethanol production from cellulosic biomass using thermophilic bacteria

    SciTech Connect (OSTI)

    Hogsett, D.A.L.; Klapatch, T.A.; Lynd, L.R.

    1995-12-01

    Thermophilic bacteria collectively exemplify organisms that produce both cellulose and ethanol while fermenting both the cellulose and hemicellulose components of biomass. As a result, thermophiles could be the basis for highly streamlined and cost-effective processes for production of renewable fuels and chemicals. Recent research results involving ethanol production from thermophilic bacteria will be presented, with a primary focus on work pursuant to molecularly-based pathway engineering to increase ethanol selectivity. Specifically, we will describe the restriction endonuclease systems operative in Clostridium thermocellum and C. thermosaccharolyticum, as well as efforts to document and improve transformation of these organisms and to clone key catabolic enzymes. In addition, selected results from fermentation studies will be presented as necessary in order to present a perspective on the status of thermophilic ethanol production.

  14. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect (OSTI)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  15. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Appendix E: Acronyms

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E - Acronyms Multi-Year Research, Development and Demonstration Plan Page E - 1 Appendix E - Acronyms AEI Advanced Energy Initiative AEO Annual Energy Outlook AFC Alkaline Fuel Cell AHJ Authorities Having Jurisdiction AMFC Alkaline Membrane Fuel Cells AMR Annual Merit Review ANL (DOE) Argonne National Laboratory APU Auxiliary Power Unit ARRA American Recovery and Reinvestment Act of 2009 ASES American Solar Energy Society ASME American Society of Mechanical Engineers AST Accelerated Stress Test

  16. Planning and management of the Nido Reef Complex Oil Field development, Philippines

    SciTech Connect (OSTI)

    Harry, R.Y.

    1981-01-01

    As Operator for the Northeast Palawan consortium, Philippines-Cities Service, Inc., commenced the Philippines first commercial offshore oil production from the Nido Reef Complex Oil Field on February 1, 1979, some 11 months after a decision by management to start development. The relative speed at which design, fabrication, and construction were accomplished is attributed to the use of the concepts of project planning, task force approach, and project management. This paper presents the above concepts as applied to the Nido Complex.

  17. Employee Agreement for Pathways Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agreement for Pathways Program Employee Agreement for Pathways Program PDF icon Employee Agreement for Pathways Program More Documents & Publications Career Pathways Frequently Asked Questions (FAQs) DOE Mentoring Guidance and Program Plan Book1

  18. HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

  19. Development of a CFD Analysis Plan for the first VHTR Standard Problem

    SciTech Connect (OSTI)

    Richard W. Johnson

    2008-09-01

    Data from a scaled model of a portion of the lower plenum of the helium-cooled very high temperature reactor (VHTR) are under consideration for acceptance as a computational fluid dynamics (CFD) validation data set or standard problem. A CFD analysis will help determine if the scaled model is a suitable geometry for validation data. The present article describes the development of an analysis plan for the CFD model. The plan examines the boundary conditions that should be used, the extent of the computational domain that should be included and which turbulence models need not be examined against the data. Calculations are made for a closely related 2D geometry to address these issues. It was found that a CFD model that includes only the inside of the scaled model in its computational domain is adequate for CFD calculations. The realizable k~e model was found not to be suitable for this problem because it did not predict vortex-shedding.

  20. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  1. Regulatory Technology Development Plan Sodium Fast Reactor. Mechanistic Source Term Development

    SciTech Connect (OSTI)

    Grabaskas, David S.; Brunett, Acacia Joann; Bucknor, Matthew D.; Sienicki, James J.; Sofu, Tanju

    2015-02-28

    Construction and operation of a nuclear power installation in the U.S. requires licensing by the U.S. Nuclear Regulatory Commission (NRC). A vital part of this licensing process and integrated safety assessment entails the analysis of a source term (or source terms) that represents the release of radionuclides during normal operation and accident sequences. Historically, nuclear plant source term analyses have utilized deterministic, bounding assessments of the radionuclides released to the environment. Significant advancements in technical capabilities and the knowledge state have enabled the development of more realistic analyses such that a mechanistic source term (MST) assessment is now expected to be a requirement of advanced reactor licensing. This report focuses on the state of development of an MST for a sodium fast reactor (SFR), with the intent of aiding in the process of MST definition by qualitatively identifying and characterizing the major sources and transport processes of radionuclides. Due to common design characteristics among current U.S. SFR vendor designs, a metal-fuel, pool-type SFR has been selected as the reference design for this work, with all phenomenological discussions geared toward this specific reactor configuration. This works also aims to identify the key gaps and uncertainties in the current knowledge state that must be addressed for SFR MST development. It is anticipated that this knowledge state assessment can enable the coordination of technology and analysis tool development discussions such that any knowledge gaps may be addressed. Sources of radionuclides considered in this report include releases originating both in-vessel and ex-vessel, including in-core fuel, primary sodium and cover gas cleanup systems, and spent fuel movement and handling. Transport phenomena affecting various release groups are identified and qualitatively discussed, including fuel pin and primary coolant retention, and behavior in the cover gas and containment. Radionuclides released from a primary sodium fire are also considered as potential sources. Any available experimental data and pertinent results relevant to the aforementioned phenomena are discussed, and operating incidents at domestically operated facilities are also examined. Considering the extensive range of phenomena affecting the release of radionuclides, the existing state of knowledge generally appears to be substantial, and may be sufficient in most areas. For core damage accidents, high retention rates should be expected within the fuel matrix and primary sodium coolant for all radionuclides other than the noble gases. These factors greatly reduce the magnitude of possible radionuclide release to the environment. Several possible gaps within the knowledgebase were identified during this effort. First, there are uncertainties with regard to radionuclide release from metal fuel in the molten state. Another knowledge gap appears in the available thermodynamic data regarding the behavior of lanthanides and actinides in liquid sodium. While not necessarily a phenomenological knowledge gap, a determination of the data requirements for MST development should be formally made prior to the expenditure of significant future research efforts. That is, if additional experimentation is performed in support of MST development, it is important to identify the proper quality assurance requirements for licensing

  2. Evaluation and development plan of NRTA measurement methods for the Rokkasho Reprocessing Plant

    SciTech Connect (OSTI)

    Li, T.K.; Hakkila, E.A.; Flosterbuer, S.F.

    1995-08-01

    Near-real-time accounting (NRTA) has been proposed as a safeguards method at the Rokkasho Reprocessing Plant (RRP), a large-scale commercial boiling water and pressurized water reactors spent-fuel reprocessing facility. NRTA for RRP requires material balance closures every month. To develop a more effective and practical NRTA system for RRP, we have evaluated NRTA measurement techniques and systems that might be implemented in both the main process and the co-denitration process areas at RRP to analyze the concentrations of plutonium in solutions and mixed oxide powder. Based on the comparative evaluation, including performance, reliability, design criteria, operation methods, maintenance requirements, and estimated costs for each possible measurement method, recommendations for development were formulated. This paper discusses the evaluations and reports on the recommendation of the NRTA development plan for potential implementation at RRP.

  3. A possible role for the canonical Wnt pathway in endocrine cell development in chicks

    SciTech Connect (OSTI)

    Pedersen, Anna Hauntoft; Heller, R. Scott . E-mail: shll@hagedorn.dk

    2005-08-05

    Wnt signalling is involved in many developmental processes such as proliferation, differentiation, cell fate decisions, and morphogenesis. However, little is known about Wnt signalling during pancreas development. Multiple Wnt ligands and Frizzled receptors are expressed in the embryonic mouse pancreas, the surrounding mesenchyme, and have also been detected in the chicken endoderm during development. The aim of this study was to investigate the role of canonical Wnt signalling on endocrine cell development by use of the in ovo electroporation of the chicken endoderm. Overexpression with a constitutive active form of {beta}-catenin in combination with Ngn3 resulted in reduced numbers of glucagon cells. dnLEF-1 or naked-1 did not alter endocrine cell differentiation when co-expressed with Ngn3, but dnLEF-1 appeared to have some potential for inhibiting delamination of Ngn3 cells. In addition, neuronal {beta}-III-tubulin, which had previously been considered a specific marker for neuronal cells, was observed in the pancreas and was upregulated in the electroporated Ngn3 cells and thus may be a new endocrine marker in the chicken.

  4. Next Generation Nuclear Plant Methods Research and Development Technical Program Plan -- PLN-2498

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2008-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  5. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Appendix A: Budgetary Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A - Budgetary Information Multi-Year Research, Development and Demonstration Plan Page A - 1 Appendix A -Budgetary Information The schedule for completing the milestones and achieving the targets and RD&D priorities outlined in this plan is based on expected funding levels, the current stage of development of different technologies, and the perceived difficulty in attaining the targets. Deviation from the expected funding levels may alter the schedule for completion of the tasks and

  6. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 1.0: Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction Multi-Year Research, Development and Demonstration Plan Page 1 - 1 Multi-Year Research, Development and Demonstration Plan Page 1 - 1 1.0 Introduction The U. S. Department of Energy's (DOE's or the Department's) hydrogen and fuel cell efforts are part of a broad portfolio of activities to build a competitive and sustainable clean energy economy to secure the nation's energy future. Reducing greenhouse gas emissions 80 percent by 2050 1 and eliminating dependence on imported fuel

  7. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 1, Final report

    SciTech Connect (OSTI)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-04-01

    This report describes background research for preparation of a plan for development of whole-building energy targets for new commercial buildings. The lead laboratory for this program is the Pacific Northwest Laboratory. A wide variety of expertise and resources from industry, academia, other government entities, and other DOE laboratories are used in planning, reviewing and conducting research activities. Cooperative and complementary research development, and technology transfer activities with other interested organizations are actively pursued.

  8. Development of a Future Representative Concentration Pathway for Use in the IPCC 5th Assessment Earth System Model Simulations

    SciTech Connect (OSTI)

    None

    2010-12-29

    The representative concentration pathway to be delivered is a scenario of atmospheric concentrations of greenhouse gases and other radiatively important atmospheric species, along with land-use changes, derived from the Global Change Assessment Model (GCAM). The particular representative concentration pathway (RCP) that the Joint Global Change Research Institute (JGCRI) has been responsible for is a not-to-exceed pathway that stabilizes at a radiative forcing of 4.5Wm-2 in the year 2100.

  9. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our synchrotron,

  10. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    SciTech Connect (OSTI)

    Peeler, David K.; Kim, Dong-Sang; Vienna, John D.; Schweiger, Michael J.; Piepel, Gregory F.

    2015-11-01

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, key product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule. The purpose of this advanced LAW glass research and development plan is to identify the near-term, mid-term, and longer-term research and development activities required to develop and validate advanced LAW glasses, property-composition models and their uncertainties, and an advanced glass algorithm to support WTP facility operations, including both Direct Feed LAW and full pretreatment flowsheets. Data are needed to develop, validate, and implement 1) new glass property-composition models and 2) a new glass formulation algorithm. Hence, this plan integrates specific studies associated with increasing the Na2O and SO3/halide concentrations in glass, because these components will ultimately dictate waste loadings for LAW vitrification. Of equal importance is the development of an efficient and economic strategy for 99Tc management. Specific and detailed studies are being implemented to understand the fate of Tc throughout the WTP flowsheet and the underlying mechanisms that dictate its partitioning between streams within the LAW vitrification facility. These studies are aimed at increasing the single-pass Tc retention in glass and the potential use of high-temperature mineral phases to capture Tc. The Tc-bearing mineral phases would be thermally stable and resistant to Tc release during feed melting reactions or they could serve as alternative waste forms. The LAW glass research and development is focused on reducing the total volume of LAW glass produced and minimizing the impact of (or potentially eliminating) the need for recycle.

  11. Next Generation Nuclear Plant Reactor Pressure Vessel Materials Research and Development Plan (PLN-2803)

    SciTech Connect (OSTI)

    J. K. Wright; R. N. Wright

    2010-07-01

    The U.S. Department of Energy (DOE) has selected the High-Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production, with an outlet gas temperature in the range of 750°C, and a design service life of 60 years. The reactor design will be a graphite-moderated, helium-cooled, prismatic, or pebble bed reactor and use low-enriched uranium, Tri-Isotopic (TRISO)-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. This technology development plan details the additional research and development (R&D) required to design and license the NGNP RPV, assuming that A 508/A 533 is the material of construction. The majority of additional information that is required is related to long-term aging behavior at NGNP vessel temperatures, which are somewhat above those commonly encountered in the existing database from LWR experience. Additional data are also required for the anticipated NGNP environment. An assessment of required R&D for a Grade 91 vessel has been retained from the first revision of the R&D plan in Appendix B in somewhat less detail. Considerably more development is required for this steel compared to A 508/A 533 including additional irradiation testing for expected NGNP operating temperatures, high-temperature mechanical properties, and extensive studies of long-term microstructural stability.

  12. Some Recent Developments in Treatment Planning Software and Methodology for BNCT

    DOE R&D Accomplishments [OSTI]

    Nigg, D. W.; Wheeler, F. J.; Wessol, D. E.; et al.

    1996-01-01

    Over the past several years the Idaho National Engineering Laboratory (INEL) has led the development of a unique, internationally-recognized set of software modules (BNCT-rtpe) for computational dosimetry and treatment planning for Boron Neutron Capture Therapy (BNCT). The computational capability represented by this software is essential to the proper administration of all forms of radiotherapy for cancer. Such software addresses the need to perform pretreatment computation and optimization of the radiation dose distribution in the target volume. This permits the achievement of the optimal therapeutic ratio (tumor dose relative to critical normal tissue dose) for each individual patient via a systematic procedure for specifying the appropriate irradiation parameters to be employed for a given treatment. These parameters include angle of therapy beam incidence, beam aperture and shape, and beam intensity as a function of position across the beam front. The INEL software is used for treatment planning in the current series of human glioma trials at Brookhaven National Laboratory (BNL) and has also been licensed for research and developmental purposes to several other BNCT research centers in the US and in Europe.

  13. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    SciTech Connect (OSTI)

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  14. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    SciTech Connect (OSTI)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

  15. Safety plan for the cooperative telerobotic retrieval system equipment development area

    SciTech Connect (OSTI)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  16. Understanding, Developing, and Implementing an EPA-Tribal Environmental Plan Webinar

    Broader source: Energy.gov [DOE]

    In this webinar, attendees will learn why an EPA-Tribal Environmental Plan can keep programs on track and maximize the use of available resources.

  17. EnergyPLAN | Open Energy Information

    Open Energy Info (EERE)

    Sustainable Energy Planning Research Group at Aalborg University Sector: Energy Topics: Market analysis, Pathways analysis, Policiesdeployment programs, Resource...

  18. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 1, Part A: Chapters 1 and 2

    SciTech Connect (OSTI)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 750 refs., 123 figs., 42 tabs.

  19. Site Characterization Plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 3, Part A: Chapters 6 and 7

    SciTech Connect (OSTI)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 218 figs., 50 tabs.

  20. Understanding, Developing, and Implementing an EPA-Tribal Environmental Plan Webinar

    Broader source: Energy.gov [DOE]

    In this webinar, attendees will learn why an EPA-Tribal Environmental Plan can keep programs on track and maximize the use of available resources. Josh Simmons, the Principal Consultant of Prosper...

  1. Moving granular-bed filter development program, Option III: Development of moving granular-bed filter technology for multi-contaminant control. Task 14: Test plan; Topical report

    SciTech Connect (OSTI)

    Haas, J.C.; Olivo, C.A.; Wilson, K.B.

    1994-04-01

    An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation. The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.

  2. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

  3. GLOBAL MONITORING OF URANIUM HEXIFLORIDE CYLINDERS NEXT STEPS IN DEVELOPMENT OF AN ACTION PLAN

    SciTech Connect (OSTI)

    Hanks, D.

    2010-06-09

    Over 40 industrial facilities world-wide use standardized uranium hexafluoride (UF{sub 6}) cylinders for transport, storage and in-process receiving in support of uranium conversion, enrichment and fuel fabrication processes. UF{sub 6} is processed and stored in the cylinders, with over 50,000 tU of UF{sub 6} transported each year in these International Organization for Standardization (ISO) qualified containers. Although each cylinder is manufactured to an ISO standard that calls for a nameplate with the manufacturer's identification number (ID) and the owner's serial number engraved on it, these can be quite small and difficult to read. Recognizing that each facility seems to use a different ID, a cylinder can have several different numbers recorded on it by means of metal plates, sticky labels, paint or even marker pen as it travels among facilities around the world. The idea of monitoring movements of UF{sub 6} cylinders throughout the global uranium fuel cycle has become a significant issue among industrial and safeguarding stakeholders. Global monitoring would provide the locations, movements, and uses of cylinders in commercial nuclear transport around the world, improving the efficiency of industrial operations while increasing the assurance that growing nuclear commerce does not result in the loss or misuse of cylinders. It should be noted that a unique ID (UID) attached to a cylinder in a verifiable manner is necessary for safeguarding needs and ensuring positive ID, but not sufficient for an effective global monitoring system. Modern technologies for tracking and inventory control can pair the UID with sensors and secure data storage for content information and complete continuity of knowledge over the cylinder. This paper will describe how the next steps in development of an action plan for employing a global UF{sub 6} cylinder monitoring network could be cultivated using four primary UID functions - identification, tracking, controlling, and accounting.

  4. Emergency evacuation/transportation plan update: Traffic model development and evaluation of early closure procedures. Final report

    SciTech Connect (OSTI)

    1993-10-28

    Prolonged delays in traffic experienced by Laboratory personnel during a recent early dismissal in inclement weather, coupled with reconstruction efforts along NM 502 east of the White Rock Wye for the next 1 to 2 years, has prompted Los Alamos National Laboratory (LANL) to re-evaluate and improve the present transportation plan and its integration with contingency plans maintained in other organizations. Facilities planners and emergency operations staff need to evaluate the transportation system`s capability to inefficiently and safely evacuate LANL under different low-level emergency conditions. A variety of potential procedures governing the release of employees from the different technical areas (TAs) requires evaluation, perhaps with regard to multiple emergency-condition scenarios, with one or more optimal procedures ultimately presented for adoption by Lab Management. The work undertaken in this project will hopefully lay a foundation for an on-going, progressive transportation system analysis capability. It utilizes microscale simulation techniques to affirm, reassess and validate the Laboratory`s Early Dismissal/Closure/Delayed Opening Plan. The Laboratory is required by Federal guidelines, and compelled by prudent practice and conscientious regard for the welfare of employees and nearby residents, to maintain plans and operating procedures for evacuation if the need arises. The tools developed during this process can be used outside of contingency planning. It is anticipated that the traffic models developed will allow site planners to evaluate changes to the traffic network which could better serve the normal traffic levels. Changes in roadway configuration, control strategies (signalization and signing), response strategies to traffic accidents, and patterns of demand can be modelled using the analysis tools developed during this project. Such scenarios typically are important considerations in master planning and facilities programming.

  5. Session on computation in biological pathways

    SciTech Connect (OSTI)

    Karp, P.D.; Riley, M.

    1996-12-31

    The papers in this session focus on the development of pathway databases and computational tools for pathway analysis. The discussion involves existing databases of sequenced genomes, as well as techniques for studying regulatory pathways.

  6. Characterize and explore potential sites and prepare research and development plan (site investigation study). Final draft. Task 2. Milestone report

    SciTech Connect (OSTI)

    1980-12-01

    A specific research and development plan to investigate the behavior and suitability of aquifers as compressed air energy storage (CAES) sites is presented. The proposed effort will evaluate present uncertainties in the performance of the underground energy storage subsystem and its impact on above ground plant design and cost. The project is planned to provide the utility industry with a quantitative basis for confidence that financial commitment to a demonstration plant and subsequent expansion is justified and poses acceptable risks. Activities in Phase II of a 5-phase overall CAES development program are reported. Information is included on the development of field testing specifications and schedules; selection of specific site for the conceptual design; development plan and schedule for the media site; development of analytical models of aquifer airflow; and well drilling requirements. As a result of these studies 14 sites in Illinois and Indiana were evaluated, 7 were ranked for suitability for CAES, and 4 were selected for possible use in the field testing program. Test procedures, the mathematical models and drilling requirments were developed. (LCL)

  7. Funding Opportunity Announcement: Solar Market Pathways

    Broader source: Energy.gov [DOE]

    The Solar Market Pathways funding opportunity announcement (FOA) seeks to support regional, state, tribal, and locally-driven efforts to develop multi-year solar deployment plans that will help provide business certainty and establish a clear path for the next five to ten years of solar deployment. Specifically, this FOA is intended to enable replicable multi-year strategies that spur significant solar deployment, drive down solar soft costs, support local economic development efforts, and address the potential challenges arising from increased solar penetration on the electrical grid.

  8. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2

    SciTech Connect (OSTI)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs.

  9. Aquisition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aquisition Plan Aquisition Plan This template is used for documenting the plans for acquiring hardware, software and communications equipment for a systems development project. PDF icon Aquisition Plan More Documents & Publications Feasibility Study Report Template System Design Training Plan

  10. Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    SciTech Connect (OSTI)

    None, None

    2010-09-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  11. Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan - Section 4.0 Systems Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ANALYSIS SECTION Multi-Year Research, Development, and Demonstration Plan Page 4.0 - 1 4.0 Systems Analysis The Fuel Cell Technologies Office (The Office) conducts a coordinated, comprehensive effort in modeling and analysis to clarify where hydrogen and fuel cells can be most effective from an economic, environmental, and energy security standpoint, as well as to guide RD&D priorities and set program goals. These activities support the Office's decision-making process by evaluating

  12. Characterize and explore potential sites and prepare research and development plan (site investigation study). Final draft. Task 2. Milestone report

    SciTech Connect (OSTI)

    1980-12-01

    Phase II of a 5-phase overall compressed air energy storage (CAES) development program was performed to characterize and explore potential CAES sites and to prepare a research and development plan. This volume for Phase II activities contains an evaluation of the suitability of seven selected sites to undergo field drilling and air injection testing; a bibliography; results of a literature search on the effects of air injection of aquifer-caprock well systems; reservoir data for the sites; cost estimates; and predicted potential risks from a CAES plant. (LCL)

  13. Development of a Preliminary Decommissioning Plan Following the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations - 13361

    SciTech Connect (OSTI)

    Moshonas Cole, Katherine; Dinner, Julia; Grey, Mike; Daniska, Vladimir

    2013-07-01

    The International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, published by OECD/NEA, IAEA and EC is intended to provide a uniform list of cost items for decommissioning projects and provides a standard format that permits international cost estimates to be compared. Candesco and DECOM have used the ISDC format along with two costing codes, OMEGA and ISDCEX, developed from the ISDC by DECOM, in three projects: the development of a preliminary decommissioning plan for a multi-unit CANDU nuclear power station, updating the preliminary decommissioning cost estimates for a prototype CANDU nuclear power station and benchmarking the cost estimates for CANDU against the cost estimates for other reactor types. It was found that the ISDC format provides a well defined and transparent basis for decommissioning planning and cost estimating that assists in identifying gaps and weaknesses and facilitates the benchmarking against international experience. The use of the ISDC can also help build stakeholder confidence in the reliability of the plans and estimates and the adequacy of decommissioning funding. (authors)

  14. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  15. Development plan for an advanced drilling system with real-time diagnostics (Diagnostics-While-Drilling)

    SciTech Connect (OSTI)

    FINGER,JOHN T.; MANSURE,ARTHUR J.; PRAIRIE,MICHAEL R.; GLOWKA,D.A.

    2000-02-01

    This proposal provides the rationale for an advanced system called Diagnostics-while-drilling (DWD) and describes its benefits, preliminary configuration, and essential characteristics. The central concept is a closed data circuit in which downhole sensors collect information and send it to the surface via a high-speed data link, where it is combined with surface measurements and processed through drilling advisory software. The driller then uses this information to adjust the drilling process, sending control signals back downhole with real-time knowledge of their effects on performance. The report presents background of related previous work, and defines a Program Plan for US Department of Energy (DOE), university, and industry cooperation.

  16. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    SciTech Connect (OSTI)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  17. Developing a master plan for hospital solid waste management: A case study

    SciTech Connect (OSTI)

    Karamouz, Mohammad Zahraie, Banafsheh Kerachian, Reza Jaafarzadeh, Nemat Mahjouri, Najmeh

    2007-07-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management.

  18. SU-C-17A-07: The Development of An MR Accelerator-Enabled Planning-To-Delivery Technique for Stereotactic Palliative Radiotherapy Treatment of Spinal Metastases

    SciTech Connect (OSTI)

    Hoogcarspel, S J; Kontaxis, C; Velden, J M van der; Bol, G H; Vulpen, M van; Lagendijk, J J W; Raaymakers, B W

    2014-06-01

    Purpose: To develop an MR accelerator-enabled online planning-todelivery technique for stereotactic palliative radiotherapy treatment of spinal metastases. The technical challenges include; automated stereotactic treatment planning, online MR-based dose calculation and MR guidance during treatment. Methods: Using the CT data of 20 patients previously treated at our institution, a class solution for automated treatment planning for spinal bone metastases was created. For accurate dose simulation right before treatment, we fused geometrically correct online MR data with pretreatment CT data of the target volume (TV). For target tracking during treatment, a dynamic T2-weighted TSE MR sequence was developed. An in house developed GPU based IMRT optimization and dose calculation algorithm was used for fast treatment planning and simulation. An automatically generated treatment plan developed with this treatment planning system was irradiated on a clinical 6 MV linear accelerator and evaluated using a Delta4 dosimeter. Results: The automated treatment planning method yielded clinically viable plans for all patients. The MR-CT fusion based dose calculation accuracy was within 2% as compared to calculations performed with original CT data. The dynamic T2-weighted TSE MR Sequence was able to provide an update of the anatomical location of the TV every 10 seconds. Dose calculation and optimization of the automatically generated treatment plans using only one GPU took on average 8 minutes. The Delta4 measurement of the irradiated plan agreed with the dose calculation with a 3%/3mm gamma pass rate of 86.4%. Conclusions: The development of an MR accelerator-enabled planning-todelivery technique for stereotactic palliative radiotherapy treatment of spinal metastases was presented. Future work will involve developing an intrafraction motion adaptation strategy, MR-only dose calculation, radiotherapy quality-assurance in a magnetic field, and streamlining the entire treatment process on an MR accelerator.

  19. Energy Planning

    Energy Savers [EERE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  20. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 7

    SciTech Connect (OSTI)

    1988-01-01

    The Yucca Mountain site in Neavada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining hte geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare and environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

  1. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    SciTech Connect (OSTI)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended by the Secretary of Energy and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared by the US Department of Energy (DOE) in accordance with the requirements of the Nulcear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of the site characterization plan are oulined, and compliance with applicable regulations is discussed.

  2. State of Terengganu: A development plan for the petrochemical industry and its associated downstream industries. Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-08

    This study, conducted by Chem Systems, Inc., was funded by the U.S. Trade and Development Agency on behalf of Terengganu's State Economic Planning Unit. The main objectives of the report are to: (1) Identify and list all medium stream and downstream activities, including services in petrochemical industries, using natural gas-derived ethane, propane, and butane as main feedstock and other linkages; (2) List the various enterprises noted above that can be economically and viably established in Terengganu; (3) Identify and locate the various sites for the projects identified. This is volume 1 of 2 and it contains the Final Report.

  3. State of Terengganu: A development plan for the petrochemical industry and its associated downstream industries. Appendix. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1987-02-01

    The study, conducted by Chem Systems, Inc., was funded by the U.S. Trade and Development Agency on behalf of Terengganu's State Economic Planning Unit. The main objectives of the report are to: (1) Identify and list all medium stream and downstream activities, including services in petrochemical industries, using natural gas-derived ethane, propane, and butane as main feedstock and other linkages; (2) List the various enterprises noted above that can be economically and viably established in Terengganu; (3) Identify and locate the various sites for the projects identified. This is volume 2 of 2 and it contains the Appendix.

  4. Proposed research and development plan for mixed low-level waste forms

    SciTech Connect (OSTI)

    O`Holleran, T.O.; Feng, X.; Kalb, P.

    1996-12-01

    The objective of this report is to recommend a waste form program plan that addresses waste form issues for mixed low-level waste (MLLW). The report compares the suitability of proposed waste forms for immobilizing MLLW in preparation for permanent near-surface disposal and relates them to their impact on the U.S. Department of Energy`s mixed waste mission. Waste forms are classified into four categories: high-temperature waste forms, hydraulic cements, encapsulants, and specialty waste forms. Waste forms are evaluated concerning their ability to immobilize MLLW under certain test conditions established by regulatory agencies and research institutions. The tests focused mainly on leach rate and compressive strength. Results indicate that all of the waste forms considered can be tailored to give satisfactory performance immobilizing large fractions of the Department`s MLLW inventory. Final waste form selection will ultimately be determined by the interaction of other, often nontechnical factors, such as economics and politics. As a result of this report, three top-level programmatic needs have been identified: (1) a basic set of requirements for waste package performance and disposal; (2) standardized tests for determining waste form performance and suitability for disposal; and (3) engineering experience operating production-scale treatment and disposal systems for MLLW.

  5. Site characterization plan overview: Yucca Mountain site, Nevada Research and Development Area, Nevada

    SciTech Connect (OSTI)

    1988-12-01

    To help the public better understand both the SCP and the site characterization program, the DOE has prepared this overview and the SCP Public Handbook. The overview presents summaries of selected topics covered in the SCP; it is not a substitute for the SCP. The organization of the overview is similar to that of the SCP itself, with brief descriptions of the Yucca Mountain site, the repository, and the containers in which the waste would be packaged, followed by a discussion of the characterization program to be carried out at the Yucca Mountain site. This overview is intended primarily for those persons who want to understand the general scope and basis of the site-characterization program, the activities to be conducted, and the facilities to be constructed without spending the time necessary to become familiar with all of the technical details presented in the SCP. For the readers of the SCP, the overview will be useful as a general guide to the plan. The SCP Public Handbook is a short document that contains brief descriptions of the SCP process and the contents of the SCP. It also explains how the public can submit comments on the SCP and lists the libraries and reading rooms at which the SCP is available. 9 refs., 18 tabs.

  6. Implementation Plan and Initial Development of Nuclear Concrete Materials Database for Light Water Reactor Sustainability Program

    Broader source: Energy.gov [DOE]

    The FY10 activities for development of a nuclear concrete materials database to support the Light Water Reactor Sustainability Program are summarized. The database will be designed and constructed...

  7. Five-Year Technology Development Strategic Plan Targets EM’s Decommissioning Challenges

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Leaders from EM headquarters and field offices and the UK’s Sellafield nuclear site gathered recently to discuss developing technologies needed to address decommissioning challenges across the Cold War cleanup program.

  8. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report

    SciTech Connect (OSTI)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-08-01

    This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

  9. VIRTUAL HYDROPOWER PROSPECTING: A FOUNDATION FOR WATER ENERGY RESOURCE PLANNING AND DEVELOPMENT

    SciTech Connect (OSTI)

    Randy Lee; Sera White; Julie Brizzee; Shane Cherry; Douglas Hall

    2008-06-01

    A comprehensive assessment of the gross power potential of the natural stream water energy resources of the United States was performed using state-of-the-art digital elevation models (DEMs) and geographic information system (GIS) tools. Water energy resource sites (stream segments) assessed in the basic resource assessment were further evaluated to identify which can be developed using a set of feasibility criteria. The gross power potential of each site was refined to determine its developable hydropower potential using a set of development criteria corresponding to a damless low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) project. The methodologies for performing the basic resource assessment and subsequent feasibility assessment are described and the summary results for the nation are presented.

  10. Thermal Properties Capability Development Workshop Summary to Support the Implementation Plan for PIE Thermal Conductivity Measurements

    SciTech Connect (OSTI)

    Braase, Lori; Papesch, Cynthia; Hurley, David

    2015-04-01

    The Department of Energy (DOE)-Office of Nuclear Energy (NE), Idaho National Laboratory (INL), and associated nuclear fuels programs have invested heavily over the years in infrastructure and capability development. With the current domestic and international need to develop Accident Tolerant Fuels (ATF), increasing importance is being placed on understanding fuel performance in irradiated conditions and on the need to model and validate that performance to reduce uncertainty and licensing timeframes. INL’s Thermal Properties Capability Development Workshop was organized to identify the capability needed by the various nuclear programs and list the opportunities to meet those needs. In addition, by the end of fiscal year 2015, the decision will be made on the initial thermal properties instruments to populate the shielded cell in the Irradiated Materials Characterization Laboratory (IMCL).

  11. Technology Pathways | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis » Technology Pathways Technology Pathways The Bioenergy Technologies Office (BETO) pursues a pathway approach for advancing research and development (R&D) of converting biomass into renewable fuels and products. Following the BETO's successful demonstration of cost-competitive cellulosic ethanol production technologies-R&D efforts now focus on the conversion of biomass into hydrocarbon fuels and intermediates that lead to "drop-in" replacements for gasoline, diesel,

  12. Engineering Task Plan for Development and Fabrication and Deployment of Nested Fixed Depth Fluidic Sampling and At Tank Analysis Systems

    SciTech Connect (OSTI)

    BOGER, R.M.

    2000-10-30

    This engineering task plan identifies the resources, responsibilities, and schedules for the development and deployment of a mobile, variable depth sampling system and an at-tank analysis system. The mobile, variable depth sampling system concept was developed after a cost assessment indicated a high cost for multiple deployments of the nested, fixed-depth sampling system. The sampling will provide double-shell tank (DST) staging tank waste samples for assuring the readiness of the waste for shipment to the LAW/HLW plant for treatment and immobilization. The at-tank analysis system will provide ''real-time'' assessments of the samples' chemical and physical properties. These systems support the Hanford Phase 1B vitrification project.

  13. Findings of an evaluation of public involvement programs associated with the development of a Land and Resource Management Plan for the Ouachita National Forest

    SciTech Connect (OSTI)

    Holthoff, M.G.; Howell, R.E.

    1993-08-01

    Federal regulations require the United States Forest Service (USFS) to integrate public input and values into decisions concerning land and resource management planning. The USFS has typically relied on traditional methods of involving the public, whereby public access and input to policy development are unilaterally controlled by the agency. Because of the highly political nature of land and resource management planning, such technocratic forms of public involvement and decision-making appear to be proving ineffective. This paper describes and evaluates two public involvement programs associated with the Ouachita National Forest`s (ONF) lengthy forest planning process. The research consisted of personal interviews with key program leaders and knowledgeable citizen participants, collection of secondary data, and a survey of citizen participants. Because of controversial planning decisions made during an initial planning process, the ONF was forced to re-enter the planning process in order to address unresolved planning issues and to conduct a more effective public involvement program. The supplemental planning process also resulted in a considerable degree of public contention. The survey revealed that although citizen participants were somewhat more satisfied with the supplemental public involvement program relative to the initial program, neither program was viewed as satisfactory. The findings of the study suggest that in order to be more effective, USFS public involvement programs should be more responsive to public concerns and conducted in adherence to principles of collaborative planning.

  14. Molten carbonate fuel cell product development test environmental assessment/protection plan

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    Objective of proposed action is to conduct a 250-kW product development test of M-C Power Corporation`s molten carbonate fuel cell concept, at the Kaiser Permanente San Diego Medical Center. Review of environmental impacts of this test indicate the following: no impact on solid waste disposal, water quality, noise levels, floodplains, wetlands, ecology, historic areas, or socioeconomic resources. Impact on air quality are expected to be positive.

  15. Molten carbonate fuel cell product development test environmental assessment/protection plan

    SciTech Connect (OSTI)

    Brunton, Jack; Furukawa, Vance; Frost, Grant; Danna, Mike; Figueroa, Al; Scroppo, Joseph

    1992-11-01

    Objective of proposed action is to conduct a 250-kW product development test of M-C Power Corporation's molten carbonate fuel cell concept, at the Kaiser Permanente San Diego Medical Center. Review of environmental impacts of this test indicate the following: no impact on solid waste disposal, water quality, noise levels, floodplains, wetlands, ecology, historic areas, or socioeconomic resources. Impact on air quality are expected to be positive.

  16. Developing a quality plan within an R&D organization using a graded approach

    SciTech Connect (OSTI)

    Younger, A.F.; Ellis, E.W.

    1994-04-01

    Rocky Flats is a Department of Energy facility that is managed by EG&G, Inc. The facility, located in Golden, Colorado, employs approximately 7,500 employees. Rocky Flats began operation in 1953 producing components for nuclear weapons, but in 1992, due to changing world conditions, the facility`s mission was changed. The new mission is to decontaminate and decommission the plant and make it ready for economic development for possible new business opportunities. The facility`s mission today is geared toward environmental cleanup from the wastes that were generated during the past 40 years. With these changes came a change in management philosophy that has encouraged more open communications, employee involvement, additional training for employees, and an emphasis on providing quality products and services applying Total Quality Management principles. The changing mission of the plant along with the change in management philosophy required a great deal of adjustment by employees. During this time, the Department of Energy and EG&G management was striving to incorporate these changes as quickly as possible. As part of this change, the Department of Energy required a quality program be implemented in Technology Development, which is the organization responsible for researching and developing new technologies for the environmental cleanup of the plant.

  17. Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.

    SciTech Connect (OSTI)

    Bull, Diana L; Ochs, Margaret Ellen

    2013-09-01

    This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

  18. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    SciTech Connect (OSTI)

    1988-01-01

    Chapter six describes the basis for facility design, the completed facility conceptual design, the completed analytical work relating to the resolution of design issues, and future design-related work. The basis for design and the conceptual design information presented in this chapter meet the requirements of the Nuclear Waste Policy Act of 1982, for a conceptual repository design that takes into account site-specific requirements. This information is presented to permit a critical evaluation of planned site characterization activities. Chapter seven describes waste package components, emplacement environment, design, and status of research and development that support the Nevada Nuclear Waste Storage Investigation (NNWSI) Project. The site characterization plan (SCP) discussion of waste package components is contained entirely within this chapter. The discussion of emplacement environment in this chapter is limited to considerations of the environment that influence, or which may influence, if perturbed, the waste packages and their performance (particularly hydrogeology, geochemistry, and borehole stability). The basis for conceptual waste package design as well as a description of the design is included in this chapter. The complete design will be reported in the advanced conceptual design (ACD) report and is not duplicated in the SCP. 367 refs., 173 figs., 68 tabs.

  19. Office of River Protection Advanced Low-Activity Waste Glass Research and Development Plan

    SciTech Connect (OSTI)

    Kruger, A. A.; Peeler, D. K.; Kim, D. S.; Vienna, J. D.; Piepel, G. F.; Schweiger, M. J.

    2015-11-23

    The U.S. Department of Energy Office of River Protection (ORP) has initiated and leads an integrated Advanced Waste Glass (AWG) program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product performance requirements. The integrated ORP program is focused on providing a technical, science-based foundation for making key decisions regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities in the context of an optimized River Protection Project (RPP) flowsheet. The fundamental data stemming from this program will support development of advanced glass formulations, key product performance and process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste vitrification facilities. These activities will be conducted with the objective of improving the overall RPP mission by enhancing flexibility and reducing cost and schedule.

  20. Developing a methodology and building a team to ensure objectivity in future land use planning

    SciTech Connect (OSTI)

    Cusick, L.T.

    1995-12-01

    The paper describes the steps involved in the development of an integrated methodology for identifying future land use options on Department of Energy (DOE) property and the establishment of a team to undertake the analysis. Three sources of information are considered: (1) internal and external stakeholder preferences, (2) economic data, and (3) environmental data. The analysis is part of a DOE process to propose future land use options for its real property while considering DOE missions and the expressed preferences of stakeholders. The process is presently ongoing at several DOE facilities; the analysis described herein is taking place on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. Further described in this paper are the benefits of considering stakeholder preferences in determining future land uses and the necessity of weighing economic factors and their effects on stakeholder preferences. Similarly, this paper details the need for considering environmental information to ascertain the value of the ORR`s ecological resources. During the analysis taking place on the ORR, a methodology will be developed to integrate these varied data sets and to address both the individual and the combined effects of economic and environmental factors on stakeholders preferences. Several future land use options which will result form the analysis must be: (1) technically sound and promote informed decision-making, (2) understood by the parties involved, and (3) options that can be supported by the parties involved. This framework may be used in combination with defined technical, regulatory, and legal requirements to define achievable remediation goals for the ORR.

  1. Light Water Reactor Sustainability Research and Development Program Plan -- Fiscal Year 2009–2013

    SciTech Connect (OSTI)

    Idaho National Laboratory

    2009-12-01

    Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R&D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R&D programs. The purpose of the LWRS R&D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R&D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its international engagement and leadership on nuclear safety and security issues.

  2. Next Generation Nuclear Plant Reactor Pressure Vessel Materials Research and Development Plan (PLN-2803)

    SciTech Connect (OSTI)

    J. K. Wright; R. N. Wright

    2008-04-01

    The U.S. Department of Energy has selected the High Temperature Gas-cooled Reactor design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production. It will have an outlet gas temperature in the range of 900°C and a plant design service life of 60 years. The reactor design will be a graphite moderated, helium-cooled, prismatic, or pebble-bed reactor and use low-enriched uranium, Tri-Isotopic-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Materials Research and Development Program is responsible for performing research and development on likely NGNP materials in support of the NGNP design, licensing, and construction activities. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. Studies of potential Reactor Pressure Vessel (RPV) steels have been carried out as part of the pre-conceptual design studies. These design studies generally focus on American Society of Mechanical Engineers (ASME) Code status of the steels, temperature limits, and allowable stresses. Three realistic candidate materials have been identified by this process: conventional light water reactor RPV steels A508/533, 2¼Cr-1Mo in the annealed condition, and modified 9Cr 1Mo ferritic martenistic steel. Based on superior strength and higher temperature limits, the modified 9Cr-1Mo steel has been identified by the majority of design engineers as the preferred choice for the RPV. All of the vendors have concluded, however, that with adequate engineered cooling of the vessel, the A508/533 steels are also acceptable.

  3. Next Generation Nuclear Plant Steam Generator and Intermediate Heat Exchanger Materials Research and Development Plan

    SciTech Connect (OSTI)

    J. K. Wright

    2010-09-01

    DOE has selected the High Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production. It will have an outlet gas temperature in the range of 900°C and a plant design service life of 60 years. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed reactor and use low-enriched uranium, Tri-Isotopic (TRISO)-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. Today’s high-temperature alloys and associated ASME Codes for reactor applications are approved up to 760°C. However, some primary system components, such as the Intermediate Heat Exchanger (IHX) for the NGNP will require use of materials that can withstand higher temperatures. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge. Examples include materials for the core barrel and core internals, such as the control rod sleeves. The requirements of the materials for the IHX are among the most demanding. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while at the same time setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. A number of solid solution strengthened nickel based alloys have been considered for application in heat exchangers and core internals for the NGNP. The primary candidates are Inconel 617, Haynes 230, Incoloy 800H and Hastelloy XR. Based on the technical maturity, availability in required product forms, experience base, and high temperature mechanical properties all of the vendor pre-conceptual design studies have specified Alloy 617 as the material of choice for heat exchangers. Also a draft code case for Alloy 617 was developed previously. Although action was suspended before the code case was accepted by ASME, this draft code case provides a significant head start for achieving codification of the material. Similarly, Alloy 800H is the material of choice for control rod sleeves. In addition to the above listed considerations, Alloy 800H is already listed in the nuclear section of the ASME Code; although the maximum use temperature and time need to be increased.

  4. Next Generation Nuclear Plant Intermediate Heat Exchanger Materials Research and Development Plan (PLN-2804)

    SciTech Connect (OSTI)

    J. K. Wright

    2008-04-01

    DOE has selected the High Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production. It will have an outlet gas temperature in the range of 900°C and a plant design service life of 60 years. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed reactor and use low-enriched uranium, Tri-Isotopic (TRISO)-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. Today’s high-temperature alloys and associated ASME Codes for reactor applications are approved up to 760°C. However, some primary system components, such as the Intermediate Heat Exchanger (IHX) for the NGNP will require use of materials that can withstand higher temperatures. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge. Examples include materials for the core barrel and core internals, such as the control rod sleeves. The requirements of the materials for the IHX are among the most demanding. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while at the same time setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. A number of solid solution strengthened nickel based alloys have been considered for application in heat exchangers and core internals for the NGNP. The primary candidates are Inconel 617, Haynes 230, Incoloy 800H and Hastelloy XR. Based on the technical maturity, availability in required product forms, experience base, and high temperature mechanical properties all of the vendor pre-conceptual design studies have specified Alloy 617 as the material of choice for heat exchangers. Also a draft code case for Alloy 617 was developed previously. Although action was suspended before the code case was accepted by ASME, this draft code case provides a significant head start for achieving codification of the material. Similarly, Alloy 800H is the material of choice for control rod sleeves. In addition to the above listed considerations, Alloy 800H is already listed in the nuclear section of the ASME Code; although the maximum use temperature and time need to be increased.

  5. Training Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for system/software development and installation PDF icon Training Plan More Documents & Publications System Design Transition Plan Conversion Plan

  6. Mescalero Apache Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    Example of a tribal community strategic energy plan developed by the Mescalero Apache. Source: Kabotie Consulting.

  7. Minneapolis, Minnesota: Energy Pathways Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Minneapolis, Minnesota: Energy Pathways Project Minneapolis, Minnesota: Energy Pathways Project This presentation features Brian Ross, a consultant for the City of Minneapolis, Minnesota with CR Planning. Ross provides an overview of how Minneapolis created a local energy vision for its Energy Pathways Project. View the presentation above or read the transcript

  8. OPPORTUNITIES IN SMR EMERGENCY PLANNING

    SciTech Connect (OSTI)

    Moe, Wayne

    2014-06-01

    This paper discusses the results of a cost/benefit-oriented assessment related to sizing of the emergency planning zones (EPZs) for advanced, small modular reactors (SMRs). An appropriately sized EPZ could result in significant cost savings for SMR licensees. Papers published by the U.S. Nuclear Regulatory Commission and other organizations discuss the applicability of current emergency preparedness regulatory requirements to SMRs, including determining an appropriate EPZ size. Both the NRC and the industry recognize that a methodology should be developed for determining appropriate EPZ sizing for SMRs. Relative costs for smaller EPZs envisioned for SMRs have been assessed qualitatively as discussed in this paper. Building off the foundation provided in the earlier papers, this paper provides a quantitative cost/benefit-oriented assessment of offsite emergency planning costs for EPZ sizes that may be justified for SMRs as compared to costs typically incurred for the current fleet of U.S. nuclear power plants. This assessment determined that a licensee utilizing a smaller EPZ could realize significant savings in offsite emergency planning costs over the nominal 40-year lifetime for an SMR. This cost/benefit-oriented assessment suggests that a reduction of the plume exposure pathway EPZ from 10 miles to the site boundary could reduce offsite emergency planning related costs by more than 90% over the 40 year life of a typical single unit nuclear power plant.

  9. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  10. 2015 Quality Assurance Improvement Project Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Quality Assurance Improvement Project Plan 2015 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of ...

  11. 2014 Quality Assurance Improvement Project Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Quality Assurance Improvement Project Plan 2014 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of ...

  12. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  13. Software Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Software Configuration Management Plan This template is used for documenting the ... a systems development project PDF icon Software Configuration Management Plan More ...

  14. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 2, Part A: Chapters 3, 4, and 5

    SciTech Connect (OSTI)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1--5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 575 refs., 84 figs., 68 tabs.

  15. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 4, Part B: Chapter 8, Sections 8.0 through 8.3.1.4

    SciTech Connect (OSTI)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 74 figs., 32 tabs.

  16. Methane Hydrate Field Program. Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    SciTech Connect (OSTI)

    Collett, Tim; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta; Myers, Greg; Divins, David; Morell, Margo

    2013-12-31

    This topical report represents a pathway toward better understanding of the impact of marine methane hydrates on safety and seafloor stability and future collection of data that can be used by scientists, engineers, managers and planners to study climate change and to assess the feasibility of marine methane hydrate as a potential future energy resource. Our understanding of the occurrence, distribution and characteristics of marine methane hydrates is incomplete; therefore, research must continue to expand if methane hydrates are to be used as a future energy source. Exploring basins with methane hydrates has been occurring for over 30 years, but these efforts have been episodic in nature. To further our understanding, these efforts must be more regular and employ new techniques to capture more data. This plan identifies incomplete areas of methane hydrate research and offers solutions by systematically reviewing known methane hydrate “Science Challenges” and linking them with “Technical Challenges” and potential field program locations.

  17. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  18. What are pathways?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    body. For the inhalation or airborne pathway, a material is inhaled directly into the lungs and then moves into the bloodstream. For the ingestion pathway, there are several...

  19. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    SciTech Connect (OSTI)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  20. Protein design for pathway engineering

    SciTech Connect (OSTI)

    Eriksen, DT; Lian, JZ; Zhao, HM

    2014-02-01

    Design and construction of biochemical pathways has increased the complexity of biosynthetically-produced compounds when compared to single enzyme biocatalysis. However, the coordination of multiple enzymes can introduce a complicated set of obstacles to overcome in order to achieve a high titer and yield of the desired compound. Metabolic engineering has made great strides in developing tools to optimize the flux through a target pathway, but the inherent characteristics of a particular enzyme within the pathway can still limit the productivity. Thus, judicious protein design is critical for metabolic and pathway engineering. This review will describe various strategies and examples of applying protein design to pathway engineering to optimize the flux through the pathway. The proteins can be engineered for altered substrate specificity/selectivity, increased catalytic activity, reduced mass transfer limitations through specific protein localization, and reduced substrate/product inhibition. Protein engineering can also be expanded to design biosensors to enable high through-put screening and to customize cell signaling networks. These strategies have successfully engineered pathways for significantly increased productivity of the desired product or in the production of novel compounds. (C) 2013 Elsevier Inc. All rights reserved.

  1. Developing health-based pre-planning clearance goals for airport remediation following a chemical terrorist attack: Decision criteria for multipathway exposure routes

    SciTech Connect (OSTI)

    Watson, Annetta Paule; Dolislager, Frederick; Hall, Dr. Linda; Hauschild, Veronique; Raber, Ellen; Love, Dr. Adam

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical release. What follows is the second of a two-part analysis identifying key considerations, critical information and decision criteria to facilitate post-attack and post-decontamination consequence management activities. Decision criteria analysis presented here provides first-time, open-literature documentation of multi-pathway, health-based remediation exposure guidelines for selected toxic industrial compounds, chemical warfare agents, and agent degradation products for pre-planning application in anticipation of a chemical terrorist attack. Guideline values are provided for inhalation and direct ocular vapor exposure routes as well as percutaneous vapor, surface contact, and ingestion. Target populations include various employees as well as transit passengers. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.

  2. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  3. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  4. Comprehensive Lifecycle Planning and Management System For Addressing Water Issues Associated With Shale Gas Development In New York, Pennsylvania, And West Virginia

    SciTech Connect (OSTI)

    Arthur, J. Daniel

    2012-07-01

    The objective of this project is to develop a modeling system to allow operators and regulators to plan all aspects of water management activities associated with shale gas development in the target project area of New York, Pennsylvania, and West Virginia (target area ), including water supply, transport, storage, use, recycling, and disposal and which can be used for planning, managing, forecasting, permit tracking, and compliance monitoring. The proposed project is a breakthrough approach to represent the entire shale gas water lifecycle in one comprehensive system with the capability to analyze impacts and options for operational efficiency and regulatory tracking and compliance, and to plan for future water use and disposition. It will address all of the major water-related issues of concern associated with shale gas development in the target area, including water withdrawal, transport, storage, use, treatment, recycling, and disposal. It will analyze the costs, water use, and wastes associated with the available options, and incorporate constraints presented by permit requirements, agreements, local and state regulations, equipment and material availability, etc. By using the system to examine the water lifecycle from withdrawals through disposal, users will be able to perform scenario analysis to answer "what if" questions for various situations. The system will include regulatory requirements of the appropriate state and regional agencies and facilitate reporting and permit applications and tracking. These features will allow operators to plan for more cost effective resource production. Regulators will be able to analyze impacts of development over an entire area. Regulators can then make informed decisions about the protections and practices that should be required as development proceeds. This modeling system will have myriad benefits for industry, government, and the public. For industry, it will allow planning all water management operations for a project or an area as one entity to optimize water use and minimize costs subject to regulatory and other constraints. It will facilitate analysis of options and tradeoffs, and will also simplify permitting and reporting to regulatory agencies. The system will help regulators study cumulative impacts of development, conserve water resources, and manage disposal options across a region. It will also allow them to track permits and monitor compliance. The public will benefit from water conservation, improved environmental performance as better system wide decisions are made, and greater supply of natural gas, with attendant lower prices, as costs are reduced and development is assisted through better planning and scheduling. Altogether, better economics and fewer barriers will facilitate recovery of the more than 300 trillion cubic feet of estimated recoverable natural gas resource in the Marcellus Shale in a manner that protects the environment.

  5. Environmental Regulatory Compliance Plan for Site Characterization; Yucca Mountain Site, Nevada Research and Development Area, Nevada: Revision 1

    SciTech Connect (OSTI)

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab.

  6. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEA is an independent and public corporation of the State of Alaska Created by ... for final draft development and interface with AkAES 7 Alaska's Energy Plans ...

  7. Report: EM Strategic Planning

    Office of Environmental Management (EM)

    rigorous and the utilization of Analytical Building Blocks are particularly significant steps forward for EM in its planning processes. EM has also developed alternative...

  8. A One-Step Cone-Beam CT-Enabled Planning-to-Treatment Model for Palliative Radiotherapy-From Development to Implementation

    SciTech Connect (OSTI)

    Wong, Rebecca K.S.; Letourneau, Daniel; Varma, Anita; Department of Radiation Oncology, University of Toronto, Toronto, Ontario ; Bissonnette, Jean Pierre; Fitzpatrick, David; Grabarz, Daniel; Elder, Christine; Martin, Melanie; Bezjak, Andrea; Department of Radiation Oncology, University of Toronto, Toronto, Ontario ; Panzarella, Tony; Gospodarowicz, Mary; Department of Radiation Oncology, University of Toronto, Toronto, Ontario ; Jaffray, David A.; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Department of Medical Biophysics, University of Toronto, Toronto, Ontario

    2012-11-01

    Purpose: To develop a cone-beam computed tomography (CT)-enabled one-step simulation-to-treatment process for the treatment of bone metastases. Methods and Materials: A three-phase prospective study was conducted. Patients requiring palliative radiotherapy to the spine, mediastinum, or abdomen/pelvis suitable for treatment with simple beam geometry ({<=}2 beams) were accrued. Phase A established the accuracy of cone-beam CT images for the purpose of gross tumor target volume (GTV) definition. Phase B evaluated the feasibility of implementing the cone-beam CT-enabled planning process at the treatment unit. Phase C evaluated the online cone-beam CT-enabled process for the planning and treatment of patients requiring radiotherapy for bone metastases. Results: Eighty-four patients participated in this study. Phase A (n = 9) established the adequacy of cone-beam CT images for target definition. Phase B (n = 45) established the quality of treatment plans to be adequate for clinical implementation for bone metastases. When the process was applied clinically in bone metastases (Phase C), the degree of overlap between planning computed tomography (PCT) and cone-beam CT for GTV and between PCT and cone-beam CT for treatment field was 82% {+-} 11% and 97% {+-} 4%, respectively. The oncologist's decision to accept the plan under a time-pressured environment remained of high quality, with the cone-beam CT-generated treatment plan delivering at least 90% of the prescribed dose to 100% {+-} 0% of the cone-beam CT planning target volume (PTV). With the assumption that the PCT PTV is the gold-standard target, the cone-beam CT-generated treatment plan delivered at least 90% and at least 95% of dose to 98% {+-} 2% and 97% {+-} 5% of the PCT PTV, respectively. The mean time for the online planning and treatment process was 32.7 {+-} 4.0 minutes. Patient satisfaction was high, with a trend for superior satisfaction with the cone-beam CT-enabled process. Conclusions: The cone-beam CT-enabled palliative treatment process is feasible and is ready for clinical implementation for the treatment of bone metastases using simple beam geometry, providing a streamlined one-step process toward palliative radiotherapy.

  9. 2009 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Annual Plan 2009 Annual Plan PDF icon Section 999: 2009 Annual Plan More Documents & Publications 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan

  10. Engineering development of advanced coal-fired low-emissions boiler system. Phase II subsystem test design and plan - an addendum to the Phase II RD & T Plan

    SciTech Connect (OSTI)

    1995-05-01

    Shortly after the year 2000 it is expected that new generating plants will be needed to meet the growing demand for electricity and to replace the aging plants that are nearing the end of their useful service life. The plants of the future will need to be extremely clean, highly efficient and economical. Continuing concerns over acid rain, air toxics, global climate changes, ozone depletion and solid waste disposal are expected to further then regulations. In the late 1980`s it was commonly believed that coal-fired power plants of the future would incorporate either some form of Integrated Gasification Combined Cycle (IGCC) or first generation Pressurized Fluidized Bed Combustion (PFBS) technologies. However, recent advances In emission control techniques at reduced costs and auxiliary power requirements coupled with significant improvements In steam turbine and cycle design have clearly indicated that pulverized coal technology can continue to be competitive In both cost and performance. In recognition of the competitive potential for advanced pulverized coal-fired systems with other emerging advanced coal-fired technologies, DOE`s Pittsburgh Energy Technology Center (PETC) began a research and development initiative In late 1990 named, Combustion 2000, with the intention of preserving and expanding coal as a principal fuel In the Generation of electrical power. The project was designed for two stages of commercialization, the nearer-term Low Emission Boiler System (LEBS) program, and for the future, the High Performance Power System (HIPPS) program. B&W is participating In the LEBS program.

  11. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  12. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation ...

  13. Career Pathways Frequently Asked Questions (FAQs) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Career Pathways Frequently Asked Questions (FAQs) Career Pathways Frequently Asked Questions (FAQs) The following frequently asked questions were developed by OPM's Student Programs Office. They will clarify the use of the authority and assist managers, supervisors, and human resources professionals in effectively administering the Career Pathways Program. PDF icon Career Pathways FAQs Responsible Contacts Kimberly Chappell SUPERVISORY HUMAN RESOURCES SPECIALIST E-mail

  14. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2015 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  15. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2014 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  16. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1

    SciTech Connect (OSTI)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

  17. Strategic Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is divided into two main phases. In the scientific plan phase we developed a new vision for our scientific and technology research. Plans for focus areas have been developed...

  18. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    SciTech Connect (OSTI)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  19. Hydrogen Production Pathways | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathways Hydrogen Production Pathways Hydrogen Production Pathways DOE is focused on developing technologies that can produce hydrogen at a target of less than $4/kg (delivered and dispensed). To reach these goals, the program looks at a wide portfolio of processes over a range of time frames and production scales. Currently, most hydrogen in the United States is produced by large-scale natural gas reforming. This established technology has been shown to be able to reach the cost targets in the

  20. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  1. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Dental Plan Proper dental care plays an important role in your overall health. That's why the Lab offers employees and their eligible dependents free dental coverage through Delta Dental of California. In addition to free preventive care, the plan offers both in and out of network coverage. The

  2. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  3. Idaho National Laboratory Ten-year Site Plan (2012 through 2021) -- DOE-NE's National Nuclear Capability -- Developing and Maintaining the INL Infrastructure

    SciTech Connect (OSTI)

    Cal Ozaki

    2010-06-01

    To meet long-term objectives to transform the Idaho National Laboratory (INL), we are providing an integrated, long-term vision of infrastructure requirements that support research, development and demonstration (RD&D) goals outlined in the DOE strategic plans, including the NE Roadmap and reports such as Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook. The goal of the INL Ten-year Site Plan (TYSP) is to clearly link RD&D mission goals and INL core capabilities with infrastructure requirements (single and multi-program), establish the 10-year end-state vision for INL complexes, identify and prioritize infrastructure and capability gaps, as well as the most efficient and economic approaches to closing those gaps.

  4. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  5. 2011 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan PDF icon Section 999: 2011 Annual Plan More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - June 2007 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  6. 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan 2008 Annual Plan PDF icon Section 999: 2008 Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2007 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan

  7. 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Plan 2013 Annual Plan Ultra-Deepwater and Uncoventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress, June 2013 PDF icon Section 999: 2013 Annual Plan More Documents & Publications 2011 Annual Plan Draft 2014 Annual Plan Sec. 999 Annual Plan 2012

  8. Molecular pathways of angiogenesis inhibition

    SciTech Connect (OSTI)

    Tabruyn, Sebastien P.; Griffioen, Arjan W. . E-mail: aw.griffioen@path.unimaas.nl

    2007-03-30

    A large body of evidence now demonstrates that angiostatic therapy represents a promising way to fight cancer. This research recently resulted in the approval of First angiostatic agent for clinical treatment of cancer. Progress has been achieved in decrypting the cellular signaling in endothelial cells induced by angiostatic agents. These agents predominantly interfere with the molecular pathways involved in migration, proliferation and endothelial cell survival. In the current review, these pathways are discussed. A thorough understanding of the mechanism of action of angiostatic agents is required to develop efficient anti-tumor therapies.

  9. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements between the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public Involvement PO Box 1663, MS M996 Los Alamos, NM 87544 (505) 667-0216 Email We welcome your comments and suggestions on how

  10. Prioritizing Acquisition Pathways in the State Level Concept...

    Office of Scientific and Technical Information (OSTI)

    Developing a State-specific, State-level approach (SLA) and Annual Implementation Plan ... PHYSICAL PROTECTION; 29 ENERGY PLANNING, POLICY AND ECONOMY; CONCRETES; EVALUATION; IAEA; ...

  11. Strategic Energy Planning

    Broader source: Energy.gov [DOE]

    Comprehensive strategic energy planning, whether at the state, local, or tribal level, is a critical building block for sound energy management and for advancing a clean energy economy in your jurisdiction. Use these resources—including step-by-step guides, tools, templates, trends, and examples—to develop a strategic energy plan.

  12. Assessing Pathways in Aruba

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental, and economic resilience of Aruba through an efficient use of natural resources and an implementation of ... research report, Smart Growth Pathways: Building a Green ...

  13. Technology Pathway Selection Effort

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    cost, profit for biorefinery - Excludes: taxes, distribution costs, tax credits or other ... Rationale for Selecting Pathway * HTL both extraction and conversion process (50-70% of ...

  14. Colorado oil shale development on policy and impact mitigation plan. Final report, March 31, 1980-November 30, 1982

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The impacts of accelerated oil shale development in four northwestern Colorado counties, Moffat, Rio Blanco, Mesa, and Garfield are being monitored and managed through a grant to the Colorado Department of Highways.

  15. PROJECT PROFILE: Ecolibrium3 (Solar Market Pathways) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecolibrium3 (Solar Market Pathways) PROJECT PROFILE: Ecolibrium3 (Solar Market Pathways) Title: Local Energy Matters: Solar Market Development in Duluth, MN Ecolibrium3.png Funding Opportunity: Solar Market Pathways SunShot Subprogram: Soft Costs Location: Duluth, MN Amount Awarded: $209,005 Awardee Cost Share: $52,266 Ecolibrium3's "Local Energy Matters" Solar Market Pathways project is working with state and local stakeholders to further develop residential rooftop, community, and

  16. Multiyear Program Plan Template - Phase II Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template - Phase II Guidance Multiyear Program Plan Template - Phase II Guidance EERE template and guidance for program managers to develop multiyear plans, ...

  17. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    SciTech Connect (OSTI)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-07-15

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  18. ATLAS_Strategic_Plan_09_v5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IL November 2009 2 Introduction This strategic plan is developed jointly by the ATLAS user community and the Physics Division at Argonne National Laboratory. This plan is a...

  19. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program...

  20. Program management plan for development, demonstration, testing, and evaluation efforts associated with Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

    SciTech Connect (OSTI)

    Conley, T.B.

    1994-04-01

    This program management plan covers the development, demonstration, testing, and evaluation efforts necessary to identify treatment methods for all the waste listed in Appendix B of the ORR`s LDR/FFCA as well as any new wastes which meet Appendix B criteria. To successfully identify a treatment method, at least a proof-of-principle level of understanding must be obtained: that is, the candidate processes must be demonstrated as effective in treating the wastes to the LDR; however, an optimized process is not required. Where applicable and deemed necessary and where the budgets will support them, pilot-scale demonstrations will be pursued. The overall strategy being adopted in this program will be composed of the following activities: Scoping of the study; characterization; development and screening of alternatives; treatability investigations; and detailed analysis of alternatives.

  1. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  2. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  3. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  4. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  5. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  6. Developing health-based pre-planning clearance goals for airport remediation following chemical terrorist attack: Introduction and key assessment considerations

    SciTech Connect (OSTI)

    Watson, Annetta Paule; Raber, Ellen; Dolislager, Frederick; Hauschild, Veronique; Hall, Dr. Linda; Love, Dr. Adam

    2011-01-01

    In the event of a chemical terrorist attack on a transportation hub, post-event remediation and restoration activities necessary to attain unrestricted facility re-use and re-entry could require hours to multiple days. While restoration timeframes are dependent on numerous variables, a primary controlling factor is the level of pre-planning and decision-making completed prior to chemical terrorist release. What follows is the first of a two-part analysis identifying key considerations, critical information, and decision criteria to facilitate post-attack and post-decontamination consequence management activities. A conceptual site model and human health-based exposure guidelines are developed and reported as an aid to site-specific pre-planning in the current absence of U.S. state or Federal values designated as compound-specific remediation or re-entry concentrations, and to safely expedite facility recovery to full operational status. Chemicals of concern include chemical warfare nerve and vesicant agents and the toxic industrial compounds phosgene, hydrogen cyanide, and cyanogen chloride. This work has been performed as a national case study conducted in partnership with the Los Angeles International Airport and The Bradley International Terminal. All recommended guidelines have been selected for consistency with airport scenario release parameters of a one-time, short-duration, finite airborne release from a single source followed by compound-specific decontamination.

  7. Site Transition Plan Guidance | Department of Energy

    Energy Savers [EERE]

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Reporting Pre-guidance Announcement 06-02-2011 Letter to SEP Recipients on Changes to Reporting Requirements

  8. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan 2007 Annual Plan PDF icon Section 999: 2007 Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - September 2009

  9. Recommendations: 2010 Annual Plan | Department of Energy

    Energy Savers [EERE]

    0 Annual Plan Recommendations: 2010 Annual Plan PDF icon URTAC - Recommendations on 2010 Section 999 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 2009 Annual Plan 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  10. Technology Development Plan: Geotechnical survey systems for OTEC (Ocean Thermal Energy Conversion) cold water pipes: Final subcontract report

    SciTech Connect (OSTI)

    Valent, P.J.; Riggins, M.

    1989-04-01

    This report provides an overview of current and developing technologies and techniques for performing geotechnical investigations for siting and designing Cold Water Pipes (CWP) for shelf-resting Ocean Thermal Energy Conversion (OTEC) power plants. The geotechnical in situ tools used to measure the required parameters and the equipment/systems used to deploy these tools are identified. The capabilities of these geotechnical tools and deployment systems are compared to the data requirements for the CWP foundation/anchor design, and shortfalls are identified. For the last phase of geotechnical data gathering for design, a drillship will be required to perform soil boring work, to obtain required high-quality sediment samples for laboratory dynamic testing, and to perform deep-penetration in situ tests. To remedy shortfalls and to reduce the future OTEC CWP geotechnical survey costs, it is recommended that a seafloor-resting machine be developed to advance the friction cone penetrometer, and also probably a pressuremeter, to provide geotechnical parameters to shallow subseafloor penetrations on slopes of 35/degree/ and in water depths to 1300 m. 74 refs., 19 figs., 6 tabs.

  11. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  12. Solar Market Pathways

    Broader source: Energy.gov [DOE]

    The Solar Market Pathways website distributes key insights from 15 SunShot Initiative projects that are advancing solar deployment across the United States. These projects take a variety of...

  13. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  14. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in...

  15. Information basis for developing comprehensive waste management system-US-Japan joint nuclear energy action plan waste management working group phase I report.

    SciTech Connect (OSTI)

    Nutt, M.; Nuclear Engineering Division

    2010-05-25

    The activity of Phase I of the Waste Management Working Group under the United States - Japan Joint Nuclear Energy Action Plan started in 2007. The US-Japan JNEAP is a bilateral collaborative framework to support the global implementation of safe, secure, and sustainable, nuclear fuel cycles (referred to in this document as fuel cycles). The Waste Management Working Group was established by strong interest of both parties, which arise from the recognition that development and optimization of waste management and disposal system(s) are central issues of the present and future nuclear fuel cycles. This report summarizes the activity of the Waste Management Working Group that focused on consolidation of the existing technical basis between the U.S. and Japan and the joint development of a plan for future collaborative activities. Firstly, the political/regulatory frameworks related to nuclear fuel cycles in both countries were reviewed. The various advanced fuel cycle scenarios that have been considered in both countries were then surveyed and summarized. The working group established the working reference scenario for the future cooperative activity that corresponds to a fuel cycle scenario being considered both in Japan and the U.S. This working scenario involves transitioning from a once-through fuel cycle utilizing light water reactors to a one-pass uranium-plutonium fuel recycle in light water reactors to a combination of light water reactors and fast reactors with plutonium, uranium, and minor actinide recycle, ultimately concluding with multiple recycle passes primarily using fast reactors. Considering the scenario, current and future expected waste streams, treatment and inventory were discussed, and the relevant information was summarized. Second, the waste management/disposal system optimization was discussed. Repository system concepts were reviewed, repository design concepts for the various classifications of nuclear waste were summarized, and the factors to consider in repository design and optimization were then discussed. Japan is considering various alternatives and options for the geologic disposal facility and the framework for future analysis of repository concepts was discussed. Regarding the advanced waste and storage form development, waste form technologies developed in both countries were surveyed and compared. Potential collaboration areas and activities were next identified. Disposal system optimization processes and techniques were reviewed, and factors to consider in future repository design optimization activities were also discussed. Then the potential collaboration areas and activities related to the optimization problem were extracted.

  16. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  17. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of Environment, Health, Safety and Security (AU). At the heart of this document lie our core values, vision and mission statements, 4 goals, and 11 key strategic objectives. It represents a truly collaborative effort. The values, vision, mission, goals and key strategies resulting from this process were shared and revised

  18. development-plans-and-design

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    detonation detection Radiological Security The program collaborates with domestic and international partners to address the threat of illicit use of high-priority radiological materials in the United States and abroad. The Radiological Security program accomplishes its mission by removing and disposing of excess or orphaned... Global Material Security The mission of the Office of Global Material Security (GMS) is to help partner countries secure and account for nuclear weapons, weapons-useable

  19. Energy Conservation Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conservation Plans Energy Conservation Plans Headquarters Program and Staff Office Energy Conservation Plans As part of the Department's Energy Efficiency campaign, each Headquarters Program and Staff Office participated in a contest early in 2010 to develop the best Energy Conservation Plan. These plans involved simple changes that employees could implement as part of their daily routines to help conserve energy. Plans were then divided into categories and reviewed by a panel to determine the

  20. Curation and Computational Design of Bioenergy-Related Metabolic Pathways

    SciTech Connect (OSTI)

    Karp, Peter D.

    2014-09-12

    Pathway Tools is a systems-biology software package written by SRI International (SRI) that produces Pathway/Genome Databases (PGDBs) for organisms with a sequenced genome. Pathway Tools also provides a wide range of capabilities for analyzing predicted metabolic networks and user-generated omics data. More than 5,000 academic, industrial, and government groups have licensed Pathway Tools. This user community includes researchers at all three DOE bioenergy centers, as well as academic and industrial metabolic engineering (ME) groups. An integral part of the Pathway Tools software is MetaCyc, a large, multiorganism database of metabolic pathways and enzymes that SRI and its academic collaborators manually curate. This project included two main goals: I. Enhance the MetaCyc content of bioenergy-related enzymes and pathways. II. Develop computational tools for engineering metabolic pathways that satisfy specified design goals, in particular for bioenergy-related pathways. In part I, SRI proposed to significantly expand the coverage of bioenergy-related metabolic information in MetaCyc, followed by the generation of organism-specific PGDBs for all energy-relevant organisms sequenced at the DOE Joint Genome Institute (JGI). Part I objectives included: 1: Expand the content of MetaCyc to include bioenergy-related enzymes and pathways. 2: Enhance the Pathway Tools software to enable display of complex polymer degradation processes. 3: Create new PGDBs for the energy-related organisms sequenced by JGI, update existing PGDBs with new MetaCyc content, and make these data available to JBEI via the BioCyc website. In part II, SRI proposed to develop an efficient computational tool for the engineering of metabolic pathways. Part II objectives included: 4: Develop computational tools for generating metabolic pathways that satisfy specified design goals, enabling users to specify parameters such as starting and ending compounds, and preferred or disallowed intermediate compounds. The pathways were to be generated using metabolic reactions from a reference database (DB). 5: Develop computational tools for ranking the pathways generated in objective (4) according to their optimality. The ranking criteria include stoichiometric yield, the number and cost of additional inputs and the cofactor compounds required by the pathway, pathway length, and pathway energetics. 6: Develop tools for visualizing generated pathways to facilitate the evaluation of a large space of generated pathways.

  1. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  2. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  3. DOE Announces Webinars on Energy Planning for Tribal Economic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning for Tribal Economic Development and Water Efficiency and Energy Savings DOE Announces Webinars on Energy Planning for Tribal Economic Development and Water Efficiency and ...

  4. Eastern Band of Cherokee Indians - Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Manager - Damon Lambert Tribal PlannerGrant Writer Planning & Development ... adequate housing * Seeking to develop a strategic energy plan that supports the tribe's ...

  5. Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox...

    National Nuclear Security Administration (NNSA)

    ... A quantitative or qualitative method for ... Wireless Technology O-4S Develop Pantex Strategic Infrastructure Plan O-5S Develop and ... Readiness Assessment and Maturation Plans. f. ...

  6. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  7. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  8. The Representative Concentration Pathways: An Overview (Journal Article) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect The Representative Concentration Pathways: An Overview Citation Details In-Document Search Title: The Representative Concentration Pathways: An Overview This paper summarizes the development process and main characteristics of the Representative Concentration Pathways (RCPs), a set of four new scenarios developed for the climate modeling community as a basis for long-term and near-term modeling experiments. The four RCPs together span the range of year 2100 radiative forcing

  9. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  10. EERE Unveils New Strategic Plan

    Broader source: Energy.gov [DOE]

    EERE has developed a new Strategic Plan and Implementing Framework to advance its mission and to continue to play a global leadership role in developing and deploying clean, sustainable and affordable energy technologies.

  11. Institutional plan. Fiscal year, 1997--2002

    SciTech Connect (OSTI)

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  12. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.4 through 8.7; Glossary and Acronyms

    SciTech Connect (OSTI)

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Section 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 88 figs., 42 tabs.

  13. Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configuration Management Plan Configuration Management Plan This template is used for documenting the configuration management methodology, tools, techniques, roles and responsibilities and tasks for a systems development project. PDF icon Configuration Management Plan More Documents & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration Management (SCM) A Practical Guid

  14. Community Energy Strategic Planning - Step 3 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Community Energy Strategic Planning - Step 3 This presentation provides Step 3 to the Community Energy Strategic Planning approach, Develop an Energy Vision. PDF icon Community Energy Strategic Planning: Step 3- Summary Presentation More Documents & Publications Community Energy Strategic Planning - Step 6 Community Energy Strategic Planning - Introduction Community Energy Strategic Planning - Step 5

  15. Community Energy Strategic Planning - Step 5 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Community Energy Strategic Planning - Step 5 This presentation provides Step 5 to the Community Energy Strategic Planning approach, Develop Energy Goals and Strategies. PDF icon Community Energy Strategic Planning - Step 5- Summary Presentation More Documents & Publications Community Energy Strategic Planning - Step 7 Community Energy Strategic Planning - Step 8 Community Energy Strategic Planning - Step 10

  16. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  17. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  18. PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II.

  19. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  20. Pathway and Resource Overview (Presentation)

    SciTech Connect (OSTI)

    Ruth, M. F.

    2009-11-16

    This presentation provides information about hydrogen pathway analysis, which is analysis of the total levelized cost (including return on investment). Well-to-wheels (WTW) energy use, and WTW emissions for hydrogen production, delivery, and distribution pathways.

  1. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  2. Karuk Tribe Strategic Energy Planning

    Energy Savers [EERE]

    Karuk Tribe Strategic Energy Planning Journey To Success? The 5 P's of Success #1 - Partners Local utility company #2 - Politics! Community Development or Natural Resources? #3 - Plan Do you have one already? What are all of those acronyms? # 4 - Place Reservation Fee status land # 5 - Pfunding Where do we start? In Conclusion * Nothing happens fast! * As you move forward there will be more questions * Having a plan is critical to success * Never be afraid to ask for help * Utilize your partners

  3. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Response Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an emergency and protect workers, the public, the environment, and national security. It consists of key activities: planning, preparedness, readiness assurance, and response. NNSA has a fully implemented and fully integrated departmental comprehensive emergency management system at the ready. To accomplish this, we develop and implement specific programs, plans, and

  4. 2013 Community Commitment plan approved

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Commitment Plan Approved Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit 2013 Community Commitment plan approved The plan provides funding from LANS' management fee to invest in regional education, economic development, and charitable giving programs. October 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email The

  5. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6-2020 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide.

  6. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Retirement Plan The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's commitment to its employees. The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play a vital role in demonstrating the Federal government and NNSA's commitment to its employees.

  7. Career Pathways | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Career Pathways Career Pathways The Energy/National Nuclear Security Administration (NNSA) Career Pathways Program is an innovative employment program targeting students and recent college graduates. If you are seeking an entry-level federal job or a federal internship, then check out our various opportunities! Intern Program The Pathways intern program allows students taking at least a half-time course load in an accredited high school, home schooling program, technical school, vocational

  8. DOE Vendor Communication Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vendor Communication Plan DOE Vendor Communication Plan As described in Policy Flash 2011-44, the Office of Federal Procurement Policy (OFPP) memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" required agencies to develop and submit a high-level vendor communication plan for OFPP approval. DOE's approved plan is attached. PDF icon PF2012-12 DOE Vendor Communication Plan PDF icon PF2012-12a.pdf PDF icon

  9. PROJECT PROFILE: Salt Lake City Corporation (Solar Market Pathways) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Salt Lake City Corporation (Solar Market Pathways) PROJECT PROFILE: Salt Lake City Corporation (Solar Market Pathways) Title: Wasatch Solar Project WASATCH solar logo.png Funding Opportunity: Solar Market Pathways SunShot Subprogram: Soft Costs Location: Salt Lake City, UT Amount Awarded: $600,000 Awardee Cost Share: $164,645 Salt Lake City and its partners are developing a comprehensive long-term solar deployment strategy, which includes an analysis of the value of

  10. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  11. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  12. Stormwater Pollution Prevention Plan at Pantex Plant

    SciTech Connect (OSTI)

    Lazowski, D.D.

    1995-12-31

    A Stormwater Pollution Prevention Plan was developed and implemented by the US Department of Energy`s Pantex Plant Environmental Protection Department. This plan was developed in response to requirements in the National Pollutant Discharge Elimination System (NPDES) permit. This paper briefly describes the main provisions of the plan.

  13. Comprehensive facilities plan

    SciTech Connect (OSTI)

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  14. Improving carbon fixation pathways

    SciTech Connect (OSTI)

    Ducat, DC; Silver, PA

    2012-08-01

    A recent resurgence in basic and applied research on photosynthesis has been driven in part by recognition that fulfilling future food and energy requirements will necessitate improvements in crop carbon-fixation efficiencies. Photosynthesis in traditional terrestrial crops is being reexamined in light of molecular strategies employed by photosynthetic microbes to enhance the activity of the Calvin cycle. Synthetic biology is well-situated to provide original approaches for compartmentalizing and enhancing photosynthetic reactions in a species independent manner. Furthermore, the elucidation of alternative carbon-fixation routes distinct from the Calvin cycle raises possibilities that novel pathways and organisms can be utilized to fix atmospheric carbon dioxide into useful materials.

  15. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in education, and active employee engagement in our communities. Contact Community Relations & Partnerships (505) 665-4400 Community Commitment Plans 2014 (pdf) 2013

  16. Hydrogen Pathway Cost Distributions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway Cost Distributions Hydrogen Pathway Cost Distributions Presentation on hydrogen pathway cost distributions presented January 25, 2006. PDF icon wkshpstorageuihlein.pdf...

  17. Solar Market Pathways | Department of Energy

    Energy Savers [EERE]

    Solar Market Pathways Solar Market Pathways The Solar Market Pathways program supports 15 SunShot projects that are advancing solar deployment across the United States. These...

  18. Integrated rural energy planning

    SciTech Connect (OSTI)

    El Mahgary, Y.; Biswas, A.K.

    1985-01-01

    This book presents papers on integrated community energy systems in developing countries. Topics considered include an integrated rural energy system in Sri Lanka, rural energy systems in Indonesia, integrated rural food-energy systems and technology diffusion in India, bringing energy to the rural sector in the Philippines, the development of a new energy village in China, the Niaga Wolof experimental rural energy center, designing a model rural energy system for Nigeria, the Basaisa village integrated field project, a rural energy project in Tanzania, rural energy development in Columbia, and guidelines for the planning, development and operation of integrated rural energy projects.

  19. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  20. Plan B Energy | Open Energy Information

    Open Energy Info (EERE)

    B Energy Jump to: navigation, search Name: Plan B Energy Place: Suite 402, Ontario, Canada Zip: M4P 0A3 Product: Toronto-based PV project developer. References: Plan B Energy1...

  1. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  2. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  3. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  4. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  5. SU-E-T-555: A Protontherapy Inverse Treatment Planning System Prototype with Linear Energy Transfer (LET) Optimization

    SciTech Connect (OSTI)

    Sanchez-Parcerisa, D; Carabe-Fernandez, A

    2014-06-01

    Purpose: Develop and benchmark an inverse treatment planning system (TPS) for proton radiotherapy integrating fast analytical dose and LET calculations in patient geometries and a dual objective function with both dose and LET components, enabling us to apply optimization techniques to improve the predicted outcome of treatments based on radiobiological models. Methods: The software package was developed in MATLAB and implements a fluence-dose calculation technique based on a pencil beam model for dose calculations and a 3D LET model based on the extension of the LET in the radial direction as a function of the predicted radiological pathway. Both models were benchmarked against commissioning data from our institution, dose calculations performed with a commercial treatment planning system and Monte Carlo simulations. The optimization is based on the adaptive simulated annealing approach . Results: The dose and LET calculations were tested in a water phantom and several real patient treatments. The pass rate for the gamma index analysis (3%/3mm) test was above 90% for all test cases analyzed, and the calculation time was of the order of seconds. The inverse planning module produced plans with a significantly higher mean LET in the target compared to traditional plans, without any loss of target coverage. The clinical relevance of this improvement is under consideration . Conclusion: The developed treatment planning system is a valuable clinical and research tool that enables us to incorporate LET effects into proton radiotherapy planning in a streamlined fashion.

  6. Alaska Strategic Energy Plan and Planning Handbook

    Energy Savers [EERE]

    Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence ...

  7. The Department of Energy Hydrogen and Fuel Cells Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan for the Research, Development, and Demonstration of Hydrogen and Fuel Cell Technologies September 2011 The...

  8. Title 43 CFR 1600-1610 Planning, Programming, Budgeting | Open...

    Open Energy Info (EERE)

    Abstract These regulations outline the process for development, approval, maintenance, amendment and revision of resource management plans, and the use of existing plans...

  9. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    SciTech Connect (OSTI)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  10. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

  11. Land and Facility Use Planning

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-07-09

    The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

  12. Leakage pathway layer for solar cell

    SciTech Connect (OSTI)

    Luan, Andy; Smith, David; Cousins, Peter; Sun, Sheng

    2015-12-01

    Leakage pathway layers for solar cells and methods of forming leakage pathway layers for solar cells are described.

  13. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  14. Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-05-12

    This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage.

  15. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  16. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  17. Fuel Pathways Integration Tech Team

    Broader source: Energy.gov [DOE]

    Presentation on Fuel Pathways Integration Tech Team to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004.

  18. Community Energy Strategic Planning - Step 10 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Community Energy Strategic Planning - Step 10 This presentation provides Step 10 to the Community Energy Strategic Planning approach, Develop, Adopt, and Publicize the CESP. PDF icon Community Energy Strategic Planning- Step 10- Summary Presentation More Documents & Publications Smart Grid Overview Community Energy Strategic Planning - Step 8 Community Energy Strategic Planning - Step 9

  19. Community Energy Strategic Planning - Step 8 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Community Energy Strategic Planning - Step 8 This presentation provides Step 8 to the Community Energy Strategic Planning approach, Develop a Blueprint for Implementation. PDF icon Community Energy Strategic Planning - Step 8- Summary Presentation More Documents & Publications Community Energy Strategic Planning - Step 7 Community Energy Strategic Planning - Step 10 WORKSHOP: SUSTAINABILITY IN MANUFACTURING, JANUARY 6-7

  20. ESnet Planning, Status,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network

  1. Understanding Contaminant Transport Pathways at Rocky Flats - A Basis for the Remediation Strategy

    SciTech Connect (OSTI)

    Paton, Ian

    2008-01-15

    The Rocky Flats Environmental Technology Site (RFETS) is a Department of Energy facility located approximately 16 miles northwest of Denver, Colorado. Processing and fabrication of nuclear weapons components occurred at Rocky Flats from 1952 through 1989. Operations at the Site included the use of several radionuclides, including plutonium-239/240 (Pu), americium-241 (Am), and various uranium (U) isotopes, as well as several types of chlorinated solvents. The historic operations resulted in legacy contamination, including contaminated facilities, process waste lines, buried wastes and surface soil contamination. Decontamination and removal of buildings at the site was completed in late 2005, culminating more than ten years of active environmental remediation work. The Corrective Action Decision/Record of Decision was subsequently approved in 2006, signifying regulatory approval and closure of the site. The use of RFETS as a National Wildlife Refuge is scheduled to be in full operation by 2012. To develop a plan for remediating different types of radionuclide contaminants present in the RFETS environment required understanding the different environmental transport pathways for the various actinides. Developing this understanding was the primary objective of the Actinide Migration Evaluation (AME) project. Findings from the AME studies were used in the development of RFETS remediation strategies. The AME project focused on issues of actinide behavior and mobility in surface water, groundwater, air, soil and biota at RFETS. For the purposes of the AME studies, actinide elements addressed included Pu, Am, and U. The AME program, funded by DOE, brought together personnel with a broad range of relevant expertise in technical investigations. The AME advisory panel identified research investigations and approaches that could be used to solve issues related to actinide migration at the Site. An initial step of the AME was to develop a conceptual model to provide a qualitative description of the relationships among potential actinide sources and transport pathways at RFETS. One conceptual model was developed specifically for plutonium and americium, because of their similar geochemical and transport properties. A separate model was developed for uranium because of its different properties and mobility in the environment. These conceptual models were guidelines for quantitative analyses described in the RFETS Pathway Analysis Report, which used existing data from the literature as well as site-specific analyses, including field, laboratory and modeling studies to provide quantitative estimates of actinide migration in the RFETS environment. For pathways where more than one method was used to estimate offsite loads for a specific pathway, the method yielding the highest estimated off-site was used for comparison purposes. For all actinides studied, for pre-remediation conditions, air and surface water were identified to be the dominant transport mechanisms. The estimated annual airborne plutonium-239/240 load transported off site exceeded the surface water load by roughly a factor of 40. However, despite being the largest transport pathway, airborne radionuclide concentrations at the monitoring location with the highest measurements during the period studied were less than two percent of the allowable 10 milli-rem standard governing DOE facilities. Estimated actinide loads for other pathways were much less. Shallow groundwater was approximately two orders of magnitude lower, or 1/100 of the load conveyed in surface water. The estimated biological pathway load for plutonium was approximately five orders of magnitude less, or 1/100,000, of the load estimated for surface-water. The pathway analysis results were taken into consideration during subsequent remediation activities that occurred at the site. For example, when the 903 Pad area was remediated to address elevated concentrations of Pu and Am in the surface soil, portable tent structures were constructed to prevent wind and water erosion from occurring while remediation activitie

  2. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  3. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  4. Solid Waste Management Plan. Revision 4

    SciTech Connect (OSTI)

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  5. Savannah River Site Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  6. Strategic Energy Planning

    Energy Savers [EERE]

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  7. Whole Algae Hydrothermal Liquefaction Technology Pathway

    SciTech Connect (OSTI)

    Biddy, Mary J.; Davis, Ryan; Jones, Susanne B.; Zhu, Yunhua

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the feasibility of using whole wet microalgae as a feedstock for conversion via hydrothermal liquefaction. Technical barriers and key research needs have been assessed in order for the hydrothermal liquefaction of microalgae to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  8. FreedomCAR and fuel partnership plan

    SciTech Connect (OSTI)

    None, None

    2006-03-01

    Plan that details the research effort necessary to develop the technologies to reduce dependence of the nation's personal transportation system on imported oil and minimize harmful vehicle emissions.

  9. Hiring Reform Memoranda and Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CAPITAL c* SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a ... Plan developed to improve the recruitment and hiring processes throughout the Department. ...

  10. Guide to Community Energy Strategic Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... climate action or sustainability planning effort, which ... And however the development of CESP fits into a local ... private-sector, regional, and state- level ...

  11. Topic A Awardee: Eastern Interconnection Planning Collaborative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    process among all interested stakeholders: State and Federal policy makers ... plans developed each year by regional stakeholders in collaboration with their respective ...

  12. Chicago Climate Action Plan | Open Energy Information

    Open Energy Info (EERE)

    Low emission development planning Resource Type Case studiesexamples Availability Free Website http:www.chicagoclimateactio Locality Chicago, IL References Chicago Climate...

  13. Fermilab | Directorate | Office of Integrated Planning & Performance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program...

  14. Program Execution Plan Mission Support Organizations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section 7.5, for a description of this system). 14 * Improvements Database * Lessons Learned database Several program and plans have been developed to describe how elements of...

  15. Multicriteria optimization informed VMAT planning

    SciTech Connect (OSTI)

    Chen, Huixiao; Craft, David L.; Gierga, David P.

    2014-04-01

    We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionationtreated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO-IMRT or both is necessary.

  16. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

  17. COMMERCIALIZATION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revised 11/9/2015 LOS ALAMOS NATIONAL LABORATORY RICHARD P. FEYNMAN CENTER FOR INNOVATION MATERIAL TRANSFER AGREEMENT (MTA) QUESTIONNAIRE The purpose of this questionnaire is to gather the initial information Los Alamos National Security, LLC ("LANS"), operator of the Los Alamos National Laboratory (Los Alamos), requires to consider you or your organization (the "Participant") for a transfer of any material developed at Los Alamos or owned by LANS. Instructions: 1. All fields

  18. Alaska Strategic Energy Plan and Planning Handbook

    Energy Savers [EERE]

    Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof,

  19. Microsoft PowerPoint - HAB Cesium pathway latest.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management for the Low Activity Waste Pretreatment System (LAWPS) David Bernhard ERWM Program Nez Perce Tribe P.O. Box 365 Lapwai, ID 83540 September 23, 2015 2 Outline * Reasons for not returning cesium to tanks. * Current ORP plans are the only path to make critical decision timeline for 2022 startup. * Cesium pathways considered for WSC, several possible waste types. * Possible change in cesium removal to increase efficiency; experimental but could likely work and has advantages. Would be

  20. Characterization plan for Fort St. Vrain and Peach Bottom graphite fuels

    SciTech Connect (OSTI)

    Maarschman, S.C.; Berting, F.M.; Clemmer, R.G.; Gilbert, E.R.; Guenther, R.J.; Morgan, W.C.; Sliva, P.

    1993-09-01

    Part of Fort St. Vrain (FSV) and most of the Peach Bottom (PB) reactor spent fuels are currently stored at INEL and may remain in storage for many years before disposal. Three disposal pathways have been proposed: intact disposal, fuels partially disassembled and the high-level waste fraction conditioned prior to disposal, and fuels completed disassembled and conditioned prior to disposal. Many options exist within each of these pathways. PNL evaluated the literature and other reference to develop a fuels characterization plan for these fuels. This plan provides guidance for the characteristics of the fuel which will be needed to pursue any of the storage or disposal pathways. It also provides a suggested fuels monitoring program for the current storage facilities. This report recommends a minimum of 7 fuel elements be characterized: PB Core 1 fuel: one Type II nonfailed element, one Type II failed element, and one Type III nonfailed element; PB Core 2 fuel: two Type II nonfailed fuel elements; and FSV fuel: at least two fuel blocks from regions of high temperature and fluence and long in-reactor performance (preferably at reactor end-of- life). Selection of PB fuel elements should focus on these between radial core position 8 and 14 and on compacts between compact numbers 10 and 20. Selection of FSV fuel elements should focus on these from Fuel Zones II and III, located in Core Layers 6, 7, and possibly 8.

  1. Ten Year Site Plans

    Broader source: Energy.gov [DOE]

    A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy’s overall strategic plan. It is a...

  2. Tax-Advantaged Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax-Advantaged Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow....

  3. Institutional Change Process Step 4: Implement an Action Plan | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 4: Implement an Action Plan Institutional Change Process Step 4: Implement an Action Plan Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Process for Continuous Change Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground

  4. Best Management Practice #1: Water Management Planning | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1: Water Management Planning Best Management Practice #1: Water Management Planning A successful water management program starts with a comprehensive strategic plan. The process for developing a strategic plan is generally the same for an individual facility or an agency. The plan provides information about current water uses and charts a course for water efficiency improvements, conservation activities, and water-reduction goals. A strategic plan establishes the priorities and helps

  5. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently...

  6. ENERGY Workforce Restructuring Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENERGY Workforce Restructuring Plan for the Idaho Operations Office March 2016 WORKFORCE RESTRUCTURING PLAN For the Idaho Operations Office Table of Contents I. INTRODUCTION...................................................................................................................................................... 1 Executive Summary ................................................................................................................................................ 1

  7. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  8. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Storm Water Documents Individual Permit NPDES No. NM0030759 (pdf) Storm Water Plans Site Discharge Pollution Prevention Plan (SDPPP) Volume 1 - Los AlamosPueblo...

  9. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Y Goal 4: Water Use Efficiency and Management Policy: Storm water management Y 0812 Stormwater Pollution Prevention Plan Policy: Water reuse N Plan: Water N Princeton Plasma ...

  10. National Dialogue on Career Pathways

    Broader source: Energy.gov [DOE]

    On Tuesday, September 23, 2014, the U.S. Departments of Labor, Education and Health and Human Services will host a National Dialogue on Career Pathways.  Federal agency leaders from each Department...

  11. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  12. Future land use plan

    SciTech Connect (OSTI)

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  13. Overview of the Hanford risk management plan

    SciTech Connect (OSTI)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  14. Global Pathways Analysis Tool (GPAT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Global Pathways Analysis Tool (GPAT) (Sandia National Laboratories) Objectives Calculate least-cost pathways for hydrogen supply for eight participating countries: France, Germany, Norway, Spain, Sweden, Denmark, Japan, and the United States (U.S. further divided into eight regions to allow for additional regional analysis; additional countries could be added as data becomes available). The objective is to match country level demands for hydrogen with lowest cost supply options for each country.

  15. DOE Public Access Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Public Access Plan DOE Public Access Plan On February 22, 2013, the Director of the White House Office of Science and Technology Policy (OSTP), Dr. John Holdren, issued a memorandum to all agency and department heads entitled, "Increasing Access to the Results of Federally Funded Scientific Research." The memo directed federal agencies with more than $100 million in annual conduct of research and development to develop plans for increasing public access to peer-reviewed scientific

  16. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  17. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  18. Tribal Renewable Energy Webinar: Energy Planning for Tribal Economic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning for Tribal Economic Development Tribal Renewable Energy Webinar: Energy Planning for Tribal Economic Development January 27, 2016 11:00AM to 12:30PM MST Tribal governments ...

  19. China 2050 Pathways Calculator | Open Energy Information

    Open Energy Info (EERE)

    2050 Pathways Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: China 2050 Pathways Calculator AgencyCompany Organization: China's Energy Research Institute...

  20. Whole Algae Hydrothermal Liquefaction Technology Pathway (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Whole Algae Hydrothermal Liquefaction Technology Pathway Citation Details In-Document Search Title: Whole Algae Hydrothermal Liquefaction Technology Pathway This ...

  1. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 10/08/2013 December (no committee mtgs) January February PNNL update on geophysics characterization (where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RI/FS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice 100-N Groundwater Modeling Tutorial Update on Orchard Lands Work Plan o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice Online

  2. Strategic Energy Planning Webinar Text Version | Department of Energy

    Energy Savers [EERE]

    Text Version Strategic Energy Planning Webinar Text Version Download the text version of the audio from the DOE Office of Indian Energy webinar on strategic energy planning. PDF icon DOE Office of Indian Energy Foundational Course on Strategic Energy Planning Audio Version More Documents & Publications Strategic Energy Planning Webinar Presentation Slides 2016 Tribal Energy and Economic Development January Webinar: Energy Planning for Tribal Economic Development Community-Scale Tribal

  3. Low-Carbon Growth Plans: Advancing Good Practice | Open Energy...

    Open Energy Info (EERE)

    Sector: Energy, Land Topics: Low emission development planning Resource Type: Lessons learnedbest practices Website: www.project-catalyst.infoimagespublications...

  4. Pathways to Energy Developmenty & Energy Security

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning * CreaDng a roadmap Feasibility Study * Possible roads to the ... Plan * PuFng it all together (The Roadmap) Strategic Energy Planning Energy Vision ...

  5. Pathways to Solar Hydrogen Technologies Leiden, The Netherlands) - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pathways to Solar Hydrogen Technologies Leiden, The Netherlands) Pathways to Solar Hydrogen Technologies Leiden, The Netherlands) Mon, Jun 13, 2016 11:30am 11:30 Fri, Jun 17, 2016 12:30pm 12:30 Lorentz Center, Leiden, The Netherlands Frances Houle, "Materials Research toward Technology Development" May 29 229th Electrochemical Society (ECS) Meeting (San Diego, CA

  6. Supply Chain Sustainability Analysis of Three Biofuel Pathways (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Supply Chain Sustainability Analysis of Three Biofuel Pathways Citation Details In-Document Search Title: Supply Chain Sustainability Analysis of Three Biofuel Pathways The Department of Energy's (DOE) Bioenergy Technologies Office (BETO) collaborates with industrial, agricultural, and non-profit partners to develop and deploy biofuels and other biologically-derived products. As part of this effort, BETO and its national laboratory teams conduct in-depth

  7. Joint US/Russian study on the development of a decommissioning strategy plan for RBMK-1000 unit No. 1 at the Leningrad Nuclear Power Plant

    SciTech Connect (OSTI)

    1997-12-01

    The objective of this joint U.S./Russian study was to develop a safe, technically feasible, economically acceptable strategy for decommissioning Leningrad Nuclear Power Plant (LNPP) Unit No. 1 as a representative first-generation RBMK-1000 reactor. The ultimate goal in developing the decommissioning strategy was to select the most suitable decommissioning alternative and end state, taking into account the socioeconomic conditions, the regulatory environment, and decommissioning experience in Russia. This study was performed by a group of Russian and American experts led by Kurchatov Institute for the Russian efforts and by the Pacific Northwest National Laboratory for the U.S. efforts and for the overall project.

  8. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects:

  9. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  10. A Roadmap for Strategic Development of Geothermal Exploration Technologies

    SciTech Connect (OSTI)

    Phillips, Benjamin R.; Ziagos, John; Thorsteinsson, Hildigunnur; Hass, Eric

    2013-02-13

    Characterizing productive geothermal systems is challenging yet critical to identify and develop an estimated 30 gigawatts electric (GWe) of undiscovered hydrothermal resources in the western U.S. This paper, undertaken by the U.S. Department of Energy’s Geothermal Technologies Office (GTO), summarizes needs and technical pathways that target the key geothermal signatures of temperature, permeability, and fluid content, and develops the time evolution of these pathways, tying in past and current GTO exploration Research and Development (R&D) projects. Beginning on a five-year timescale and projecting out to 2030, the paper assesses technologies that could accelerate the confirmation of 30 GWe. The resulting structure forms the basis for a Geothermal Exploration Technologies Roadmap, a strategic development plan to help guide GTO R&D investments that will lower the risk and cost of geothermal prospect identification. This roadmap is currently open for public comment. Send your comments to geothermal@ee.doe.gov.

  11. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  12. Production Planning Model

    Energy Science and Technology Software Center (OSTI)

    1998-04-20

    PRODMOD is an integrated computational tool for performing dynamic simulation and optimization for the entire high level waste complex at the Savannah River Site (SRS) It is being used at SRS for planning purposes so that all waste can be processed efficiently. The computational tool 1) optimizes waste blending sequences, 2) minimizes waste volume production, 3) reduces waste processing time, 4) provides better process control and understanding, and 5) assists strategic planning, scheduling, and costmore » estimation. PRODMOD has been developed using Aspen Technology''s software development package SPEEDUP. PRODMOD models all the key HLW processing operations at SRS: storage and evaporation: saltcake production and dissolution: filtration (dewatering): precipitation: sludge and precipitate washing: glass, grout, and organics production. Innovative approaches have been used in making PRODMOD a very fast computational tool. These innovative approaches are 1) constructing a dynamic problem as a steady state problem 2) mapping between event-space (batch processes) and time-space (dynamic processes) without sacrificing the details in the batch process. The dynamic nature of the problem is constructed in linear form where time dependence is implicit. The linear constructs and mapping algorithms have made it possible to devise a general purpose optimization scheme which couples the optimization driver with the PRODMOD simulator. The optimization scheme is capable of generating single or multiple optimal input conditions for different types of objective functions over single or multiple years of operations depending on the nature of the objective function and operating constraints.« less

  13. Workforce Analysis and Planning Division (HC-52) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Planning Division (HC-52) Workforce Analysis and Planning Division (HC-52) Mission Statement: This division provides strategic direction guidance and advice through analysis of budget and workforce projections and plans, congressional mandates, administration goals, Departmental priorities and mission needs. FUNCTIONS: Develops business intelligence, demographic and trend analyses in support of corporate workforce planning and in response to requests from within the

  14. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  15. Pathway modeling of microarray data: A case study of pathway activity changes in the testis following in utero exposure to dibutyl phthalate (DBP)

    SciTech Connect (OSTI)

    Ovacik, Meric A.; Sen, Banalata; Euling, Susan Y.; Gaido, Kevin W.; Ierapetritou, Marianthi G.; Androulakis, Ioannis P.

    2013-09-15

    Pathway activity level analysis, the approach pursued in this study, focuses on all genes that are known to be members of metabolic and signaling pathways as defined by the KEGG database. The pathway activity level analysis entails singular value decomposition (SVD) of the expression data of the genes constituting a given pathway. We explore an extension of the pathway activity methodology for application to time-course microarray data. We show that pathway analysis enhances our ability to detect biologically relevant changes in pathway activity using synthetic data. As a case study, we apply the pathway activity level formulation coupled with significance analysis to microarray data from two different rat testes exposed in utero to Dibutyl Phthalate (DBP). In utero DBP exposure in the rat results in developmental toxicity of a number of male reproductive organs, including the testes. One well-characterized mode of action for DBP and the male reproductive developmental effects is the repression of expression of genes involved in cholesterol transport, steroid biosynthesis and testosterone synthesis that lead to a decreased fetal testicular testosterone. Previous analyses of DBP testes microarray data focused on either individual gene expression changes or changes in the expression of specific genes that are hypothesized, or known, to be important in testicular development and testosterone synthesis. However, a pathway analysis may inform whether there are additional affected pathways that could inform additional modes of action linked to DBP developmental toxicity. We show that Pathway activity analysis may be considered for a more comprehensive analysis of microarray data.

  16. Microsoft PowerPoint - Plan-Budget Process [Read-Only]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PLANNING/BUDGET PROCESS Update Strategic Planning d C A Update Strategic Planning Based on Current FY AWP Update Strategic Planning d C A NSAC Long Range Plan Update 10 Year Site Plan (May) Update 10 Year Site Plan (May) Update 10 Year Site Plan (May) Update Annual Plan (10 Year Picture for DOE SC) Develop Kovar 5 Year Briefing (January - February) Develop Kovar 5 Year Briefing (January - February) Develop Kovar 5 Year Briefing (January - February) Develop 5 Year Budget Review (DOE SC) Update

  17. Transportation Energy Pathways LDRD.

    SciTech Connect (OSTI)

    Barter, Garrett; Reichmuth, David; Westbrook, Jessica; Malczynski, Leonard A.; Yoshimura, Ann S.; Peterson, Meghan; West, Todd H.; Manley, Dawn Kataoka; Guzman, Katherine Dunphy; Edwards, Donna M.; Hines, Valerie Ann-Peters

    2012-09-01

    This report presents a system dynamics based model of the supply-demand interactions between the USlight-duty vehicle (LDV) fleet, its fuels, and the corresponding primary energy sources through the year2050. An important capability of our model is the ability to conduct parametric analyses. Others have reliedupon scenario-based analysis, where one discrete set of values is assigned to the input variables and used togenerate one possible realization of the future. While these scenarios can be illustrative of dominant trendsand tradeoffs under certain circumstances, changes in input values or assumptions can have a significantimpact on results, especially when output metrics are associated with projections far into the future. Thistype of uncertainty can be addressed by using a parametric study to examine a range of values for the inputvariables, offering a richer source of data to an analyst.The parametric analysis featured here focuses on a trade space exploration, with emphasis on factors thatinfluence the adoption rates of electric vehicles (EVs), the reduction of GHG emissions, and the reduction ofpetroleum consumption within the US LDV fleet. The underlying model emphasizes competition between13 different types of powertrains, including conventional internal combustion engine (ICE) vehicles, flex-fuel vehicles (FFVs), conventional hybrids(HEVs), plug-in hybrids (PHEVs), and battery electric vehicles(BEVs).We find that many factors contribute to the adoption rates of EVs. These include the pace of technologicaldevelopment for the electric powertrain, battery performance, as well as the efficiency improvements inconventional vehicles. Policy initiatives can also have a dramatic impact on the degree of EV adoption. Theconsumer effective payback period, in particular, can significantly increase the market penetration rates ifextended towards the vehicle lifetime.Widespread EV adoption can have noticeable impact on petroleum consumption and greenhouse gas(GHG) emission by the LDV fleet. However, EVs alone cannot drive compliance with the most aggressiveGHG emission reduction targets, even as the current electricity source mix shifts away from coal and towardsnatural gas. Since ICEs will comprise the majority of the LDV fleet for up to forty years, conventional vehicleefficiency improvements have the greatest potential for reductions in LDV GHG emissions over this time.These findings seem robust even if global oil prices rise to two to three times current projections. Thus,investment in improving the internal combustion engine might be the cheapest, lowest risk avenue towardsmeeting ambitious GHG emission and petroleum consumption reduction targets out to 2050.3 AcknowledgmentThe authors would like to thank Dr. Andrew Lutz, Dr. Benjamin Wu, Prof. Joan Ogden and Dr. ChristopherYang for their suggestions over the course of this project. This work was funded by the Laboratory DirectedResearch and Development program at Sandia National Laboratories.4

  18. Seneca Nation of Indians Strategic Energy Resource Plan

    Energy Savers [EERE]

    Seneca Nation of Indians Strategic Energy Resource Plan Strategic Energy Resource Plan DOE "First Steps Towards Developing Renewable DOE "First Steps Towards Developing Renewable Energy & Energy Efficiency" Grant Project Review Energy & Energy Efficiency" Grant Project Review October 20, 2004 October 20, 2004 Golden, Colorado Golden, Colorado Project Overview Project Overview Long Range Energy Plan Long Range Energy Plan - - Three Phase Three Phase Development

  19. Energy Emergency Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-07-08

    To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

  20. Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  1. Plans, Implementation, and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the Geothermal Technologies Office » Plans, Implementation, and Results Plans, Implementation, and Results The Geothermal Technologies Office (GTO) carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from them. Overview Learn more about this EERE Office.

  2. Standard Review Plan | Department of Energy

    Energy Savers [EERE]

    Standard Review Plan Standard Review Plan The Standard Review Plan (SRP) serves as the corporate framework designed to formalize the Department of Energy (DOE) and Environmental Management (EM) institutional processes and requirements associated with the review of project activities in support of Critical Decision (CD) approvals. The SRP has been developed as a collaborative effort between EM and the Chief of Nuclear Safety (CNS), Office of the Under Secretary. It is modeled after similar

  3. Building America Research-to-Market Plan

    SciTech Connect (OSTI)

    Werling, Eric

    2015-11-01

    This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.

  4. Fort Sill Apache Energy Planning Project

    Energy Savers [EERE]

    Apache Fort Sill Apache Energy Planning Project Energy Planning Project Rebecca Ware Energy/Environmental Director Fort Sill Apache Tribe Apache, Oklahoma 73005 580-588-2298 DOE Tribal Energy Program Review October 2005 2 Project Overview To create an Energy Office within the Tribal Structure To complete an Energy Analysis of Tribal Building Space, current and proposed To develop a Tribal Strategic Energy Plan 3 Project Location Southwest Oklahoma Tribal Headquarters, Apache, Oklahoma East Gore,

  5. Fort Sill Apache Energy Planning Project

    Energy Savers [EERE]

    Apache Fort Sill Apache Energy Planning Project Energy Planning Project Fort Sill Apache Tribe Apache, Oklahoma 73005 580-588-2298 Vanessa Vance Robles - Energy Coordinator October 20, 2004 2 Project Overview Project Overview To create an Energy Office within the Tribal Structure To complete an Energy Analysis of Tribal Building Space, current and proposed To Develop a Tribal Strategic Energy Plan 3 Project Location Project Location Southwestern Oklahoma * Tribal Headquarters, Apache, Oklahoma *

  6. Planning for Emergencies | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Response Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an emergency and protect workers, the public, the environment, and national security. It consists of key activities: planning, preparedness, readiness assurance, and response. NNSA has a fully implemented and fully integrated departmental comprehensive emergency management system at the ready. To accomplish this, we develop and implement specific programs, plans, and

  7. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Training and Qualification Plan Examples Example 66 8.2.2 Personnel Training and Qualification The Personnel Training and Qualification program is being established as defined by laws, DOE Orders, and company directives to ensure that personnel are trained and qualified to perform assigned tasks. The training and qualification program develops personnel proficiency commensurate with the scope, complexity, and nature of an assigned activity. Management is responsible for developing staff position

  8. EM Quality Assurance Centralized Training Platform Project Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel. PDF icon EM Quality ...

  9. State Energy Strategic Plans

    Broader source: Energy.gov [DOE]

    Most state energy offices across the country are required to have current and long-term strategic energy management plans in place. These strategic plans help to ensure that state agencies are...

  10. Decommissioning Plan RM

    Broader source: Energy.gov [DOE]

    The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

  11. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  12. Sample Project Execution Plan

    Broader source: Energy.gov [DOE]

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  13. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  14. Business Owners: Prepare a Business Recovery Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Business Recovery Plan Business Owners: Prepare a Business Recovery Plan Business Owners: Prepare a Business Recovery Plan Smart business owners develop and test a written business recovery plan to support them through disasters and help them stay in operation. Planning ahead will help your company get back to business more quickly. Consider your risks-How might a disaster affect your business operations? What natural disasters are most likely where you operate? Identify your critical business

  15. Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan |

    Energy Savers [EERE]

    Department of Energy Program Plan Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan The NEAMS program plan includes information on the program vision, objective, scope, schedule and cost, management, development team and collaborations. PDF icon NEAMS Executive Program Plan.pdf More Documents & Publications NEAMS Quarterly Report April-June 2013 Nuclear Energy Advanced Modeling and Simulation (NEAMS) Software Verification and Validation (V&V) Plan Requirements

  16. ESPC ENABLE ACQUISITION PLAN TEMPLATE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLAN TEMPLATE ESPC ENABLE ACQUISITION PLAN TEMPLATE Template serves as a tool to help agencies develop an acquisition plan. The acquisition plan is the first formal step in the ESPC ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process. File enable_acquisition.docx More Documents & Publications Energy Savings Performance Contract ENABLE Briefing ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND

  17. CEBAF - environmental protection program plan

    SciTech Connect (OSTI)

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  18. EERE Strategic Plan Briefing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan Briefing 2 EERE Strategic Plan 3 Strategic Plan Input 4 Strategic Plan Implementation 5 A strong and prosperous America, powered by clean, affordable, and secure energy EERE Vision 6 To create and sustain American leadership in the transition to a global clean energy economy EERE Mission 7 EERE Organizational Principles * Economic Prosperity * Affordability * Reduced Environmental Impact * Energy Security * Consumer Choice 8 EERE Five Core Questions * Impact Is this a

  19. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  20. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  1. Biennial Plan Summary

    National Nuclear Security Administration (NNSA)

    ` Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary Report to Congress March 2016 National Nuclear Security Administration United States Department of Energy Washington, DC 20585 Department of Energy/National Nuclear Security Administration | March 2016 Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary | Page i Message from the Administrator This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal

  2. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  3. Mitigation Action Plan

    Energy Savers [EERE]

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  4. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  5. FEMP Suggested ESPC Milestone Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Suggested ESPC Milestone Plan FEMP Suggested ESPC Milestone Plan Document provides the Federal Energy Management Program's (FEMP's) suggested energy savings performance contract (ESPC) milestones from task order development to award process. File Download the Suggested ESPC Milestone Plan. More Documents & Publications FEMP ESPC Project Development Resource Guide ESPC ENABLE NOTICE OF INTENT TO AWARD GUIDE AND TEMPLATE FEMP Comprehensive ESPC Workshop

  6. Tank waste remediation system environmental program plan

    SciTech Connect (OSTI)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  7. Planning Brings Vision Into Focus (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2013-04-01

    This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.

  8. Pandemic Influenza Pediatric Office Plan Template

    SciTech Connect (OSTI)

    HCTT CHE

    2010-01-01

    This is a planning tool developed by pediatric stakeholders that is intended to assist pediatric medical offices that have no pandemic influenza plan in place, but may experience an increase in patient calls/visits or workload due to pandemic influenza.

  9. TWRS Systems Engineering Working Plan

    SciTech Connect (OSTI)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  10. Asotin Creek Model Watershed Plan

    SciTech Connect (OSTI)

    Browne, D.; Holzmiller, J.; Koch, F.; Polumsky, S.; Schlee, D.; Thiessen, G.; Johnson, C.

    1995-04-01

    The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon``. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity. The watershed coordinator for the Asotin County Conservation District led a locally based process that combined local concerns and knowledge with technology from several agencies to produce the Asotin Creek Model Watershed Plan.

  11. Geothermal Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Plan Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan The Geothermal Technologies Program Multi-Year Research, ...

  12. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  13. Decommissioning Plan RM

    Office of Environmental Management (EM)

    Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of

  14. 2002 WIPP Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  15. planning | OpenEI Community

    Open Energy Info (EERE)

    planning Home Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 07:53 Detailed Planning Kicks Off planning Skype call this morning to discuss details. More...

  16. Savannah River Site's Site Specific Plan

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  17. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  18. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  19. Ecuador-Quito City Climate Change Action Plan | Open Energy Informatio...

    Open Energy Info (EERE)

    Quito City Climate Change Action Plan Jump to: navigation, search Name Ecuador-Quito City Climate Change Action Plan AgencyCompany Organization Climate and Development Knowledge...

  20. Appendix K Disposal Cell Groundwater Monitoring Plan

    Office of Legacy Management (LM)

    Disposal Cell Groundwater Monitoring Plan

  1. DOE Releases Climate Change Technology Program Strategic Plan | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Change Technology Program Strategic Plan DOE Releases Climate Change Technology Program Strategic Plan September 20, 2006 - 9:01am Addthis Plan Outlines Strategies for Reducing Greenhouse Gas Emissions through Development and Deployment of Advanced Technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today released the Climate Change Technology Program (CCTP) Strategic Plan, which details measures to accelerate the development and reduce the cost of new and advanced

  2. Strategic Energy Planning Webinar Presentation Slides | Department of

    Energy Savers [EERE]

    Energy Presentation Slides Strategic Energy Planning Webinar Presentation Slides Download presentation slides from the DOE Office of Indian Energy webinar on strategic energy planning. PDF icon DOE Office of Indian Energy Foundational Course on Strategic Energy Planning More Documents & Publications 2016 Tribal Energy and Economic Development January Webinar: Energy Planning for Tribal Economic Development Community-Scale Tribal Renewable Energy Workshop: California Community-Scale

  3. Ex-Situ Catalytic Fast Pyrolysis Technology Pathway

    SciTech Connect (OSTI)

    Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates converting woody biomass using ex-situ catalytic fast pyrolysis followed by upgrading to gasoline , diesel and jet range blendstocks . Technical barriers and key research needs that should be pursued for this pathway to be competitive with petroleum-derived blendstocks have been identified.

  4. In-Situ Catalytic Fast Pyrolysis Technology Pathway

    SciTech Connect (OSTI)

    Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates converting woody biomass using in-situ catalytic fast pyrolysis followed by upgrading to gasoline, diesel, and jet range blendstocks. Technical barriers and key research needs that should be pursued for this pathway to be competitive with petroleum-derived blendstocks have been identified.

  5. Catalytic Upgrading of Sugars to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the catalytic conversion of solubilized carbohydrate streams to hydrocarbon biofuels, utilizing data from recent efforts within the National Advanced Biofuels Consortium (NABC) in collaboration with Virent, Inc.. Technical barriers and key research needs that should be pursued for the catalytic conversion of sugars pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks have been identified.

  6. Biological Conversion of Sugars to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Tan, Eric; Tao, Ling; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the biological conversion of biomass derived sugars to hydrocarbon biofuels, utilizing data from recent literature references and information consistent with recent pilot scale demonstrations at NREL. Technical barriers and key research needs have been identified that should be pursued for the pathway to become competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  7. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  8. Not planning a sustainable transport system

    SciTech Connect (OSTI)

    Finnveden, Gran kerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 20102021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: Two cases are studied to analyse if current planning supports a sustainable transport system. Results show that the plans are in conflict with several of the environmental quality objectives. Long-term climate goals are not included in the planning processes. Current practices do not contribute to a sustainable planning processes. Methodology and process for environmental assessments must be further developed and discussed.

  9. SES CANDIDATE DEVELOPMENT PROGRAM

    Energy Savers [EERE]

    SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) DOE F 360.1 (11-03) Executive Development Plan (EDP) Name: Title: Organization: Office: RATIONALE FOR PLAN: APPROVALS: Candidate Signature: Date: Supervisor: Date: Mentor: Date: SES Candidate Development Program Manager: Date: DOE Executive Resources Board: Date: 1 U.S. DEPARTMENT OF ENERGY DOE F 360.1 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Executive Development Plan (EDP) NAME OF SES CANDIDATE:

  10. National Security Technology Incubation Project Continuation Plan

    SciTech Connect (OSTI)

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  11. Fuel Cell Technologies Program Multi-Year Research, Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Research, Development and Demonstration Plan Page B - 1 Multi-Year Research, Development and Demonstration Plan Page B - 2 Multi-Year Research, Development and ...

  12. HUD Choice Neighborhoods Planning Grants Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Housing and Urban Development (HUD) is accepting applications for the Choice Neighborhoods Planning Grant Program to leverage investments in public schools and education programs, early learning programs and services, and improved access to jobs.

  13. Planned Geothermal Capacity | Open Energy Information

    Open Energy Info (EERE)

    Map of Development Projects Planned Geothermal Capacity in the U.S. is reported by the Geothermal Energy Association via their Annual U.S. Geothermal Power Production and...

  14. Project Execution Plan Review Module (RM)

    Broader source: Energy.gov [DOE]

    The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

  15. 2012 Quality Assurance Improvement Project Plan

    Broader source: Energy.gov [DOE]

    This Project Plan is jointly developed by the Department of Energy (DOE) Office of Environmental Management (EM) and the Energy Facility Contractors Group (EFCOG), to provide execution support to...

  16. Resource Planning Guide

    Energy Science and Technology Software Center (OSTI)

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  17. Program Development Plan and Team up

    SciTech Connect (OSTI)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  18. Power Electronics Research and Development Program Plan

    Broader source: Energy.gov [DOE]

    As the United States transitions to a digital economy, the need to upgrade the nation’s aging electric grid is becoming increasingly evident. Electricity demand is projected to increase by 30%...

  19. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Configuration Control Examples Example 38 7.05 Configuration Management Plan Configuration Management activities for this project will be carried out using a graded approach, consistent with the guidance in Reference #20. The CM Actions listed in Appendix B of Reference #20 will be carried out as follows: Action 1 - Develop System Boundaries This action will not be performed because the intended End State of 322-M is that all systems will be deactivated and all utility services that were

  20. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Environmental Plan Examples Example 51 8.1 ENVIRONMENTAL STRATEGY A significant part of the strategy for maintaining compliance with environmental regulatory requirements during the PFP Stabilization and Deactivation Project is to apply the process described in the Tri-Party Agreement, Section 8.0, "Facility Decommissioning Process." The Section 8.0 process will allow the DOE to develop agreements with the State and Federal regulatory agencies facilitating timely stabilization of the

  1. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development - 2016/17; April 12, 2016 | Department of Energy CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 PDF icon Work Plan and Development 2016-04-12 More Documents & Publications Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards North America Energy

  2. Army energy plan

    SciTech Connect (OSTI)

    Not Available

    1980-08-08

    The Army Energy Plan describes the current and projected (to the year 2000) energy situation in which the Department of the Army (DA) must operate and summarizes those actions and programs which have been developed and/or are needed to cope with those conditions. It addresses the Army goals, objectives, policies, and programs for all Army activities. World industrial growth during the past century has been characterized and hastened by the widespread availability of inexpensive energy, primarily petroleum. The Arab oil embargo of 1973 served to drive home a number of points, key among them being that the world's principal oil consumers are not the major oil producers. The Middle East and Africa have an estimated 67 percent of the petroleum reserves while Western Europe and the Western Hemisphere have only 16 percent. By most estimates, these reserves are expected to be exhausted within the next 70 years. In the year following the 1973 oil embargo, prices for petroleum rose threefold, signaling the end of the cheap oil. In the decade of the seventies, the price of imported crude oil has risen from $1.80 per barrel to an exorbitant $30.00 per barrel. The combined threats of exhaustion and high cost mandate the use of alternate sources of energy. The distribution of alternate sources of recoverable oil, such as tar sands and oil shale, favor the Western Hemisphere, but economical recovery techniques have not been developed.

  3. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN

    Office of Scientific and Technical Information (OSTI)

    CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN (Technical Report) | SciTech Connect LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN Citation Details In-Document Search Title: LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND

  4. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN

    Office of Scientific and Technical Information (OSTI)

    CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN (Technical Report) | SciTech Connect LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAH'S UINTA BASIN Citation Details In-Document Search Title: LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND

  5. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  6. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Relations Plan Community Relations Plan The Laboratory maintains an open working relationship with communities and interested members of the public. August 1, 2013 Guests listen to Lab historian Ellen McGhee on tour of historical sites Guests listen to Laboratory historian Ellen McGhee on a tour of historical sites. What the plan does Establishes a productive government-to-government relationship with local tribes and pueblos Keeps communities and interested members of the public

  7. Plan Design Highlights for:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LEGAL NOTICES: Access federal and state legal notices related to your plan: deltadentalins.com/about/legal/index-enrollee.html 1 In Texas, Delta Dental Insurance Company offers a Dental Provider Organization (DPO) plan. 2 Enrollees are responsible for any coinsurance, deductible, amount over the plan maximum and charges for non-covered services. 3 Verify that your dentist is a contracted Delta Dental PPO network dentist before each appointment. 4 Applies only to procedures covered under your

  8. Flight Planning Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protocol and Flight Plans Protocol for each flight: * Afternoon before the flight (~3PM): a. Determine next day's meteorology b. Decide on preliminary flight plan and discuss with pilots and other investigators * Morning of the flight (7AM) * A. re-evaluate forecast, state of aircraft, finalize flight plan with pilots and other investigators. * Mid-morning (11AM) or early-afternoon (1PM): departure on that day's flight. Within 4 hours after the return of each flight, chief scientist needs to

  9. SEAB Climate Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

  10. Planning, Budget, and Analysis

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation on Planning, Budget, and Analysis to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004.

  11. planning for emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

  12. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... each early-out program, window benefit, disability program, plan-loan feature, employee ... Cover employees from the Contractor's private operations and its DOE contract work. (2) ...

  13. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... each early-out program, window benefit, disability program, plan-loan feature, employee ... Cover employees from the contractor's private operations and its DOE contract work. (2) ...

  14. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  15. Sampling and Analysis Plan

    Office of Legacy Management (LM)

    ... pasture (light brown area) and alfalfa crop (green area). Groundwater Contingency Remedy Optimization Work Plan for OU III, Monticello, Utah U.S. Department of Energy Doc. No. ...

  16. BPA Energy Efficiency Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

  17. Environmental Monitoring Plan, Revision 6

    SciTech Connect (OSTI)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

  18. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathways for Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole Algae Hydrothermal ...

  19. Recovery Act Interconnection Transmission Planning

    Broader source: Energy.gov [DOE]

    Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

  20. The Climate Change Action Plan: Technical supplement

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.