Powered by Deep Web Technologies
Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

2

Development of a maintenance program  

SciTech Connect (OSTI)

Bruce Nuclear Generating Station (NGS) A in Tiverton, Ontario, has been operating for 10 yr. One reason for its successful operating record is the development of an effective preventive maintenance program. Evaluation of the existing preventive program included a review of maintenance of selected key equipment over the life of the station. The review emphasized the need to improve the storage and sorting of maintenance information for trend and cost analysis, manpower planning, reliability, and radiation dose calculations.

Walker, I.

1987-01-01T23:59:59.000Z

3

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

maintenance is conducted. Regular, preventive maintenance can pay off in peace of mind, utility cost savings, routine maintenance helps to prolong the life of the home and may prevent the need for major repairs of Benjamin Franklin, "An ounce of prevention is worth a pound of cure." Regular, routine maintenance enhances

4

Business Development - Predictive Maintenance Products  

E-Print Network [OSTI]

BUSINESS DEVELOPMENT - PREDICTIVE MAINTENANCE PRODUCTS Phillip Sceiczina, ifm efector, inc. In this time of global competitiveness, more companies are focusing on reducing manufacturing costs to increase profits. Energy costs can be a...

Sceiczina, P.

2005-01-01T23:59:59.000Z

5

Simple Maintenance Saves Costly Furnace Repair/Replacement |...  

Broader source: Energy.gov (indexed) [DOE]

furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the...

6

Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair  

SciTech Connect (OSTI)

This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations.

Not Available

1983-12-30T23:59:59.000Z

7

Review of Maintenance and Repair Times for Components in Technological Facilities  

SciTech Connect (OSTI)

This report is a compilation of some unique component repair time data and it also presents citations of more extensive reports where lists of repair times can be found. This collection of information should support analysts who seek to quantify maintainability and availability of high technology and nuclear energy production systems. While there are newer sources of repair time information, most, if not all, of the newer sources are proprietary and cannot be shared. This report offers data that, while older, is openly accessible and can serve as reasonable estimates of repair times, at least for initial studies. Some times were found for maintenance times in radiation environments, and some guidance for multiplicative factors to use to account for work in contamination areas.

L. C. Cadwallader

2012-11-01T23:59:59.000Z

8

Subj: Educational and General (E&G) Facility Support Provide an overview of Facility Operations, Maintenance, Repair and Renovation and Space  

E-Print Network [OSTI]

support, and, preventive and unscheduled maintenance of all building systems, with the exception of BAS Operations, Maintenance, Repair and Renovation and Space Management Procedures and Practices. KEY DEFINITIONS chambers, fume hoods, fixed seating, etc. are normally considered part of the building. Maintenance, repair

9

Development of a composite repair system for reinforcing offshore risers  

E-Print Network [OSTI]

A research program was conducted to investigate the application of composite materials in repairing corroded offshore risers, leading to the development of an optimized repair using a hybrid carbon/E-glass system. The objective of this research...

Alexander, Christopher Richard

2009-05-15T23:59:59.000Z

10

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

11

Condition-based maintenance under an imperfect repair policy for a deteriorating production system  

E-Print Network [OSTI]

is periodically monitored. Imperfect preventive maintenance activities, which restore the production system policy, both linear and non-linear imperfect preventive maintenance cost functions are investigated preventive maintenance (or preventive replacement) is usually used. After each preventive maintenance action

Boyer, Edmond

12

Development and validation of bonded composite doubler repairs for commercial aircraft.  

SciTech Connect (OSTI)

A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack, impact, and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safely extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC), Boeing, and Federal Express completed a pilot program to validate and introduce composite doubler repair technology to the U.S. commercial aircraft industry. This project focused on repair of DC-10 fuselage structure and its primary goal was to demonstrate routine use of this repair technology using niche applications that streamline the design-to-installation process. As composite doubler repairs gradually appear in the commercial aircraft arena, successful flight operation data is being accumulated. These commercial aircraft repairs are not only demonstrating the engineering and economic advantages of composite doubler technology but they are also establishing the ability of commercial maintenance depots to safely adopt this repair technique. This report presents the array of engineering activities that were completed in order to make this technology available for widespread commercial aircraft use. Focused laboratory testing was conducted to compliment the field data and to address specific issues regarding damage tolerance and flaw growth in composite doubler repairs. Fatigue and strength tests were performed on a simulated wing repair using a substandard design and a flawed installation. In addition, the new Sol-Gel surface preparation technique was evaluated. Fatigue coupon tests produced Sol-Gel results that could be compared with a large performance database from conventional, riveted repairs. It was demonstrated that not only can composite doublers perform well in severe off-design conditions (low doubler stiffness and presence of defects in doubler installation) but that the Sol-Gel surface preparation technique is easier and quicker to carry out while still producing optimum bonding properties. Nondestructive inspection (NDI) methods were developed so that the potential for disbond and delamination growth could be monitored and crack growth mitigation could be quantified. The NDI methods were validated using full-scale test articles and the FedEx aircraft installations. It was demonstrated that specialized NDI techniques can detect flaws in composite doubler installations before they reach critical size. Probability of Detection studies were integrated into the FedEx training in order to quantify the ability of aircraft maintenance depots to properly monitor these repairs. In addition, Boeing Structural Repair and Nondestructive Testing Manuals were modified to include composite doubler repair and inspection procedures. This report presents the results from the FedEx Pilot Program that involved installation and surveillance of numerous repairs on operating aircraft. Results from critical NDI evaluations are reported in light of damage tolerance assessments for bonded composite doublers. This work has produced significant interest from airlines and aircraft manufacturers. The successful Pilot Program produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. This report discusses both the laboratory data and Pilot Program results from repair installations on operating aircraft to introduce composite doubler repairs into mainstream commercial aircraft use.

Roach, Dennis Patrick; Rackow, Kirk A.

2007-07-01T23:59:59.000Z

13

05.01 1 Budget Maintenance and Development REGENTS' POLICY  

E-Print Network [OSTI]

05.01 1 Budget Maintenance and Development REGENTS' POLICY PART V ­ FINANCE AND BUSINESS MANAGEMENT Chapter 05.01 - Budget Development and Maintenance P05.01.010. Budget Policy. A. The budget by their respective annually adopted budgets and approved amendments, in accordance with procedure established

Pantaleone, Jim

14

Job Maintenance and Capital Development Fund (North Carolina)  

Broader source: Energy.gov [DOE]

The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of...

15

Development and testing of a low-maintenance, energy-absorbing bridge rail  

E-Print Network [OSTI]

vehicle leaves the flow of traffic and strikes a bridge rail. The second concern is for the safety of the maintenance workers who must repair bridge rail damage following a collision. Third, the increasing cost of maintaining br idge decks and rails... during a more severe collision. Furthermore, the new bridge rail is designed to fit either new or existing standard bridge decks. Following development of the new bridge rail, two full-scale vehicle crash-tests were performed at the TTI Research...

Cain, John Craig

1985-01-01T23:59:59.000Z

16

Development/Plasticity/Repair Group I Metabotropic Glutamate Receptors Control  

E-Print Network [OSTI]

Development/Plasticity/Repair Group I Metabotropic Glutamate Receptors Control Metaplasticity the spinal cord can support several forms of plasticity, including response­outcome (instrumental) learning. This inhibi- tion of plasticity in spinal learning is itself a form of plasticity that requires i

Grau, James

17

Development/Plasticity/Repair Identification of Nicotinic Acetylcholine Receptor Recycling  

E-Print Network [OSTI]

Development/Plasticity/Repair Identification of Nicotinic Acetylcholine Receptor Recycling and Its, University of Michigan, Ann Arbor, Michigan 48109 In the CNS, receptor recycling is critical for synaptic plasticity; however, the recycling of receptors has never been observed at peripheral synapses. Using a novel

Alford, Simon

18

FAciLity mAintenAnce College of Rural and Community Development  

E-Print Network [OSTI]

maintenance trends and developing strate- gies for future maintenance needs. Occupational endorsement Program--Troubleshooting HVAC Systems......................................2 CTT F151--Introduction to Plumbing Tools

Hartman, Chris

19

Exemption from Application of the Service Contract Act -Certification UT-B Contracts Div Maintenance, Calibration, or Repair of Certain Equipment  

E-Print Network [OSTI]

Exemption from Application of the Service Contract Act - Certification UT-B Contracts Div-sca-equip-certification-ext-venx-mar09.doc EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT ACT ­ MAINTENANCE, CALIBRATION, OR REPAIR to the conditions in paragraph (a) of this provision, and the Company determines that the Service Contract Act ­ (1

Pennycook, Steve

20

Exemption from Application of the Service Contract Act -Requirements UT-B Contracts Div Maintenance, Calibration, or Repair of Certain Equipment  

E-Print Network [OSTI]

Exemption from Application of the Service Contract Act - Requirements UT-B Contracts Div-sca-equip-requirement-ext-jan08.doc EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT ACT ­ MAINTENANCE, CALIBRATION, OR REPAIR inapplicable, and the Agreement shall become subject to the Service Contract Act. In such case, the procedures

Pennycook, Steve

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Object-oriented development of EMS maintenance and documentation tools  

SciTech Connect (OSTI)

This paper describes the use of an object-oriented application framework to implement a PC-based tool kit for use by EMS software support personnel in software maintenance activities including training, documentation development, and trouble-analysis. In addition to a description of the development of the underlying code which provides the tool kit functionality, the paper describes the steps necessary to instantiate the tool kit on a given EMS subsystem.

Sanders, C.W. [Entergy Services, Inc., Pine Bluff, AR (United States). Power System Operations Dept.

1995-12-31T23:59:59.000Z

22

Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY  

E-Print Network [OSTI]

Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

23

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

.3 Significance of Software Development and Maintenance Research. 6 1.4 Research Scope???????????????????? 7 1.5 Organization of this Dissertation?????????????. 9 II PROJECT VIABILITY: A MULTIDIMENSIONAL MEASURE?. 10 2... ???????. 89 4.7 Acceptable ranges of ROC value?????????????????. 90 4.8 Classification for the LR model?????????????????? 93 4.9 Process related variable measurement and sources?????????? 99 xi TABLE Page 4.10 Product related variable...

Raja, Uzma

2009-06-02T23:59:59.000Z

24

Development of quick repairing technique for ceramic burner in hot stove of blast furnace  

SciTech Connect (OSTI)

Refractories of ceramic burner in hot stoves at Wakayama No. 4 blast furnace were damaged. There are only three hot stoves, so repairing must be done in a short. Therefore, a quick repairing technique for ceramic burners has been developed, and two ceramic burners were repaired in just 48 hours.

Kondo, Atsushi; Doura, Kouji; Nakamura, Hirofumi [Sumitomo Metal Industries, Ltd., Wakayama (Japan). Wakayama Steel Works

1997-12-31T23:59:59.000Z

25

Development/Plasticity/Repair A Structural MRI Study of Human Brain Development from  

E-Print Network [OSTI]

Development/Plasticity/Repair A Structural MRI Study of Human Brain Development from Birth to 2 Carolina, Chapel Hill, North Carolina 27599-7510 Brain development in the first 2 years after birth and schizophrenia. Knowledge regarding this period is currently quite limited. We studied structural brain

Utah, University of

26

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes  

E-Print Network [OSTI]

and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

27

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after  

E-Print Network [OSTI]

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard developed a transgenic mouse to permit conditional and selective ablation of hair cells in the adult mouse

Rubel, Edwin

28

Development of bonded composite doublers for the repair of oil recovery equipment.  

SciTech Connect (OSTI)

An unavoidable by-product of a metallic structure's use is the appearance of crack and corrosion flaws. Economic barriers to the replacement of these structures have created an aging infrastructure and placed even greater demands on efficient and safe repair methods. In the past decade, an advanced composite repair technology has made great strides in commercial aviation use. Extensive testing and analysis, through joint programs between the Sandia Labs FAA Airworthiness Assurance Center and the aviation industry, have proven that composite materials can be used to repair damaged aluminum structure. Successful pilot programs have produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. With this foundation in place, this effort is adapting bonded composite repair technology to civil structures. The use of bonded composite doublers has the potential to correct the difficulties associated with current repair techniques and the ability to be applied where there are no rehabilitation options. It promises to be cost-effective with minimal disruption to the users of the structure. This report concludes a study into the application of composite patches on thick steel structures typically used in mining operations. Extreme fatigue, temperature, erosive, and corrosive environments induce an array of equipment damage. The current weld repair techniques for these structures provide a fatigue life that is inferior to that of the original plate. Subsequent cracking must be revisited on a regular basis. The use of composite doublers, which do not have brittle fracture problems such as those inherent in welds, can help extend the structure's fatigue life and reduce the equipment downtime. Two of the main issues for adapting aircraft composite repairs to civil applications are developing an installation technique for carbon steel and accommodating large repairs on extremely thick structures. This study developed and proved an optimum field installation process using specific mechanical and chemical surface preparation techniques coupled with unique, in-situ heating methods. In addition, a comprehensive performance assessment of composite doubler repairs was completed to establish the viability of this technology for large, steel structures. The factors influencing the durability of composite patches in severe field environments were evaluated along with related laminate design issues.

Roach, David W.; Rackow, Kirk A.

2005-06-01T23:59:59.000Z

29

On-line maintenance methodology development and its applications  

SciTech Connect (OSTI)

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

Kim, J.; Jae, M. [Dept. of Nuclear Engineering, Hanyang Univ., 17 Haengdang, Sungdong, Seoul (Korea, Republic of)

2012-07-01T23:59:59.000Z

30

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

Mara, Leo M. (Livermore, CA)

1998-01-01T23:59:59.000Z

31

Development/Plasticity/Repair Dendritic Spine Dynamics Regulate the Long-Term Stability  

E-Print Network [OSTI]

Development/Plasticity/Repair Dendritic Spine Dynamics Regulate the Long-Term Stability of Synaptic Plasticity Cian O'Donnell,1,2 Matthew F. Nolan,3 and Mark C. W. van Rossum1 1Institute for Adaptive of Edinburgh, Edinburgh EH8 9XD, United Kingdom Long-term synaptic plasticity requires postsynaptic influx

van Rossum, Mark

32

Development/Plasticity/Repair A Refractory Period for Rejuvenating GABAergic Synaptic  

E-Print Network [OSTI]

Development/Plasticity/Repair A Refractory Period for Rejuvenating GABAergic Synaptic Transmission and Ocular Dominance Plasticity with Dark Exposure Shiyong Huang,1* Yu Gu,2* Elizabeth M. Quinlan,2 Dark exposure initiated in adulthood reactivates robust ocular dominance plasticity in the visual

Gruner, Daniel S.

33

Development/Plasticity/Repair Simultaneous NMDA-Dependent Long-Term Potentiation of  

E-Print Network [OSTI]

Development/Plasticity/Repair Simultaneous NMDA-Dependent Long-Term Potentiation of EPSCs and Long activity-dependent long-term plasticity of neuronal networks is the interplay between excitatory, whereas a nitric oxide synthase inhibitor was ineffec- tive. Finally, network-induced plasticity

Segal, Menahem

34

Development/Plasticity/Repair Identification of Modulators of Hair Cell Regeneration in the  

E-Print Network [OSTI]

Development/Plasticity/Repair Identification of Modulators of Hair Cell Regeneration compounds that modulate hair cell regeneration in zebrafish. Of the 1680 compounds evaluated, we identified,aresyntheticglucocorticoidsthatpotentiatedhaircellnumbersduringregenerationandalsoinducedhair cell addition in the absence of damage. BrdU analysis confirmed that the extra hair cells arose from

Rubel, Edwin

35

Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future  

SciTech Connect (OSTI)

The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs.

Vincent, J.R.

1990-09-01T23:59:59.000Z

36

Asphalt, Concrete, and Turf Maintenance and Preservation  

E-Print Network [OSTI]

preventive maintenance, pavement distress and identification, and best practices for the maintenance Consultant WSB and Associates, Inc. 763-287-7184 jstewart@wsbeng.com #12;2 Preventive Maintenance Preventive maintenance and minor rehab, and is often used to repair environmental damage. Preventive maintenance narrows

Minnesota, University of

37

Application and development of technologies for engine-condition-based maintenance of emergency diesel generators  

SciTech Connect (OSTI)

The emergency diesel generator (EDG) of a nuclear power plant has the role of supplying emergency electric power to protect the reactor core system in the event of the loss of offsite power supply. Therefore, EDGs should be subject to periodic surveillance testing to verify their ability to supply specified frequencies and voltages at design power levels within a limited time. To maintain optimal reliability of EDGs, condition monitoring/diagnosis technologies must be developed. Changing from periodic disassemble maintenance to condition-based maintenance (CBM) according to predictions of equipment condition is recommended. In this paper, the development of diagnosis technology for CBM and the application of a diesel engine condition-analysis system are described. (authors)

Choi, K. H.; Sang, G.; Choi, L. Y. S.; Lee, B. O. [Korea Hydro and Nuclear Power Company Central Research Institue, 70, 1312 -gil Yuseong-daero Yuseong-gu, Daejeon 305-343 (Korea, Republic of)

2012-07-01T23:59:59.000Z

38

Optimization Online - Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Jun 29, 2004 ... Abstract: We deal with the problem of scheduling preventive maintenance (PM) by minimizing a performance function which reflects repair and ...

Michael Bartholomew-Biggs

2004-06-29T23:59:59.000Z

39

Development of criteria for fatigue repairs in bridge girders damaged by out-of-plane distortion  

E-Print Network [OSTI]

repaired and unrepaired cracks along the longitudinal web-to-flange connection of a plate girder subjected to a linear bending stress to determine if repair by drilling holes is really necessary. The results of the finite element analyses...

Wilson, Scott David

1994-01-01T23:59:59.000Z

40

Development and validation of nondestructive inspection techniques for composite doubler repairs on commercial aircraft  

SciTech Connect (OSTI)

Composite doublers, or repair patches, provide an innovative repair technique which can enhance the way aircraft are maintained. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is possible to bond a single boron-epoxy composite doubler to the damaged structure. In order for the use of composite doublers to achieve widespread use in the civil aviation industry, it is imperative that methods be developed which can quickly and reliably assess the integrity of the doubler. In this study, a specific composite application was chosen on an L-1011 aircraft in order to focus the tasks on application and operation issues. Primary among inspection requirements for these doublers is the identification of disbonds, between the composite laminate and aluminum parent material, and delaminations in the composite laminate. Surveillance of cracks or corrosion in the parent aluminum material beneath the doubler is also a concern. No single nondestructive inspection (NDI) method can inspect for every flaw type, therefore it is important to be aware of available NDI techniques and to properly address their capabilities and limitations. A series of NDI tests were conducted on laboratory test structures and on full-scale aircraft fuselage sections. Specific challenges, unique to bonded composite doubler applications, were highlighted. An array of conventional and advanced NDI techniques were evaluated. Flaw detection sensitivity studies were conducted on applicable eddy current, ultrasonic, X-ray and thermography based devices. The application of these NDI techniques to composite doublers and the results from test specimens, which were loaded to provide a changing flaw profile, are presented in this report. It was found that a team of these techniques can identify flaws in composite doubler installations well before they reach critical size.

Roach, D.; Walkington, P.

1998-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Draft of new maintenance standards for LWR in Japan  

SciTech Connect (OSTI)

Activities of development of new maintenance standards for operating nuclear power plant in Japan are described. The work of drafting the standards has been done by the Committee of Nuclear Plant Operation and Maintenance Standards (POMS), that was organized in the Japan Power Engineering and Inspection Corporation under the entrustment from the Ministry of International Trade and Industry. The articles of ASME Section XI related to inspection, flaw evaluation and repair have been examined and modified, if necessary, so as to introduce latest Japanese database and technological knowledge. In the area of repairs, many repair techniques verified in recent years in Japan were incorporated i n addition to those specified in ASME Section XI. Finally major differences between ASME Section XI and the draft of the standards are listed.

Iida, Kunihiro [Shibaura Inst. of Tech., Tokyo (Japan). Dept. of Mechanical Engineering

1996-12-01T23:59:59.000Z

42

Preventative Maintenance (PM) Policy Outline the policy regarding preventative vehicle maintenance on University of Michigan (U-  

E-Print Network [OSTI]

Preventative Maintenance (PM) Policy Objective Outline the policy regarding preventative vehicle maintenance on University of Michigan (U- M) vehicles. Policy 1. All maintenance performed on U-M vehicles their own campus maintenance facility to repair their fleet vehicles. 2. To ensure proper stewardship of U

Kirschner, Denise

43

Vehicle Maintenance Policy Outline the policy regarding vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Policy Objective Outline the policy regarding vehicle maintenance at University of Michigan (U-M). Policy 1. All maintenance performed on U-M vehicles must be coordinated through Garage to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine maintenance

Kirschner, Denise

44

Review of In-Service Inspection and Repair Technique Developments for French Liquid Metal Fast Reactors  

SciTech Connect (OSTI)

In-service monitoring of nuclear plants is indispensable for both the Operator and the Regulator. The notion of in-service monitoring ranges from the continuous monitoring of the reactor in operation to the thorough in-service reactor inspection during programmed shutdowns. However, the highly specific environment found in French liquid metal fast reactor plants - Phenix and Superphenix - makes monitoring and inspection complicated because of the use of a sodium coolant that is hot, opaque, and difficult to drain.The Commissariat a l'Energie Atomique, in collaboration with its traditional French partners, Electricite de France utilities and FRAMATOME/Novatome Engineering, decided to conduct a 6-yr research and development program (1994-2000) to explore this problem vis-a-vis Superphenix, as well as the possibilities of intervening within the reactor block or on components in a sodium environment. Furthermore, the safety reevaluation of Phenix, conducted between 1994 and 2003, represented an excellent 'test bench' during which the limits of inspection processes - applied to an integrated reactor concept - were surpassed using techniques such as fuel subassembly head scanning, ultrasonic examination of the core support, and visual inspection of the cover-gas plenum following a partial sodium draining. Repair techniques were investigated for cleaning of sodium wet structure surfaces, cutting of damaged parts, and welding in sodium aerosol atmosphere. Both conventional and laser processes were tested.

Baque, F. [Commissariat a l'Energie Atomique Cadarache (France)

2005-04-15T23:59:59.000Z

45

Designing a scrubber for maintenance  

SciTech Connect (OSTI)

Under Round 4 of the U.S. Department of Energy`s (DOE) Clean Coal Technology program, New York State Electric & Gas Corporation (NYSEG), in partnership with Saarberg-Holter-Umwelttechnik (SHU), Consolidation Coal Company and Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units I and 2 at the Milliken Steam Electric Station. Units I and 2 are 1950s vintage Combustion Engineering tangentially fired pulverized coal units, which are rated at nominal 150 MW each and operate in balanced draft mode. The Flue Gas Desulfurization (FGD) system for Unit 2 was placed into operation in January 1995 and the Unit I system in June 1995. The project incorporates several unique aspects: low pH operation; a ceramic tile-lined cocurrent/countercurrent, split module absorber; a wet stack supported on the roof of the FGD building; and closed loop, zero liquid discharge operation that produces commercial grade gypsum and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge, space-saving design, and minimization of maintenance requirements of a wet scrubber. The paper provides a brief overview of the project scrubber design relating to maintenance considerations. A discussion of the early results of the maintenance history is also provided. Repair techniques that have been developed and tested for ceramic tile lined modules are included. 1 fig.

Mahlmeister, M.E.; Baron, E.S. [New York State Electric and Gas Corp., Binghamton, NY (United States); Watts, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

1996-12-01T23:59:59.000Z

46

Visitors' attitudes toward the maintenance, preservation and development of Ichkeul National Park, Tunisia  

E-Print Network [OSTI]

on citizens' attitudes and behaviors to support park maintenance. Ichkeul National Park includes a variety of natural resources. Individual resource use at Ichkeul today will determine whether or not resources will be available for all Tunisians... nearly tripled (International Union for the Conservation of Nature, 1971; 1985). In many nations, the concept of a national park is foreign, part of the inundation of ideas recently introduced to the society. Citizens who have traditional uses...

Nelson, Alanna Lee

2012-06-07T23:59:59.000Z

47

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

48

Inspection & Maintenance  

E-Print Network [OSTI]

vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

49

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestr  

E-Print Network [OSTI]

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freig pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation ope

50

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

51

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. In lieu of a field installation on an abandoned pipeline, a preliminary nondestructive testing protocol is being developed to determine the success or failure of the fiber-reinforced liner pipeline repairs. Optimization and validation activities for carbon-fiber repair methods are ongoing.

Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

2005-07-20T23:59:59.000Z

52

Awarded Products Maintenance, Repair & Operations TOOLS & HARDWARE  

E-Print Network [OSTI]

Products HVAC, pumps & compressors, plumbing suppliers, paint, oil and lubricants, lumber & carpentry, rigging supplies HVAC, pumps & compressors, plumbing suppliers, paint, oil and lubricants, lumber, paint, oil and lubricants, lumber & carpentry, rigging supplies Specialty Lighting A division of CED

Tsien, Roger Y.

53

Repair and Replacement projects help FM to honor its commitment to  

E-Print Network [OSTI]

of the University. Services provided fall into three major categories: preventive maintenance, routine repairs friendly power. Energy Management is continually recognized for the superior maintenance. · Maintenance (www.facm.umn. edu/services/maintenance.html) Maintenance Operations preserves the physical assets

Gulliver, Robert

54

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. The first round of optimization and validation activities for carbon-fiber repairs are complete. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-12-31T23:59:59.000Z

55

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect that the failure can be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

56

Modelling of dependence between critical failure and preventive maintenance  

E-Print Network [OSTI]

Modelling of dependence between critical failure and preventive maintenance: The repair alert model, or a preventive maintenance (PM) action, where the latter will prevent the failure. It is reasonable to expect be avoided by a possible preventive maintenance (PM) at some random time Z. If Z

Langseth, Helge

57

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is only marginally effective at restoring the pressure containing capabilities of pipelines. Failure pressures for larger diameter pipe repaired with a semi-circular patch of carbon fiber-reinforced composite lines were also marginally greater than that of a pipe section with un-repaired simulated damage without a liner. These results indicate that fiber reinforced composite liners have the potential to increase the burst pressure of pipe sections with external damage Carbon fiber based liners are viewed as more promising than glass fiber based liners because of the potential for more closely matching the mechanical properties of steel. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the field trial portion of this program.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-08-17T23:59:59.000Z

58

INTERNAL REPAIR OF PIPELINES  

SciTech Connect (OSTI)

The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) Pipe diameter sizes range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.). The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.), with 95% using 558.8 mm (22 in.) pipe. An evaluation of potential repair methods clearly indicates that the project should continue to focus on the development of a repair process involving the use of GMAW welding and on the development of a repair process involving the use of fiber-reinforced composite liners.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

2004-04-12T23:59:59.000Z

59

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

60

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

62

Communications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE POLICIES DURING A  

E-Print Network [OSTI]

of maintenance policies which consist of minimal repair and preventive maintenance is analyzed for the case preventive maintenance can reduce the age of the machine by x units. Under a constant maintenance costCommunications in Statistics-Stochastic Models, 16(1), 121-142 (2000) 1 BAYESIAN MAINTENANCE

Popova, Elmira

63

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

64

Software Development Engineer This position is responsible for development and maintenance of enterprise-class business and  

E-Print Network [OSTI]

by business need. This includes the design and implementation of an approved QA process thorough QA and integrated testing support for new applications and system modifications as required, users, developers while communicating status, coordinating implementation schedules and supporting

Ravikumar, B.

65

Development of a Pavement Maintenance and Rehabilitation Project Formation and Prioritization Methodology that Reflects Agency Priorities and Improves Network Condition  

E-Print Network [OSTI]

crucial step in pavement management is the formation and prioritization of maintenance and rehabilitation (M&R) projects that compete for limited funding for inclusion in the agency’s multiyear pavement management plan (PMPs). In general, many highway...

Narciso, Paul John Ross

2013-07-22T23:59:59.000Z

66

Dam Construction and Maintenance (Minnesota)  

Broader source: Energy.gov [DOE]

Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may...

67

Detection and Repair of Ionizing Radiation-Induced DNA Double Strand Breaks: New Developments in Nonhomologous End Joining  

SciTech Connect (OSTI)

DNA damage can occur as a result of endogenous metabolic reactions and replication stress or from exogenous sources such as radiation therapy and chemotherapy. DNA double strand breaks are the most cytotoxic form of DNA damage, and defects in their repair can result in genome instability, a hallmark of cancer. The major pathway for the repair of ionizing radiation-induced DSBs in human cells is nonhomologous end joining. Here we review recent advances on the mechanism of nonhomologous end joining, as well as new findings on its component proteins and regulation.

Wang, Chen [Departments of Biochemistry and Molecular Biology and Oncology, and Southern Alberta Cancer Research Institute, University of Calgary, Calgary (Canada)] [Departments of Biochemistry and Molecular Biology and Oncology, and Southern Alberta Cancer Research Institute, University of Calgary, Calgary (Canada); Lees-Miller, Susan P., E-mail: leesmill@ucalgary.ca [Departments of Biochemistry and Molecular Biology and Oncology, and Southern Alberta Cancer Research Institute, University of Calgary, Calgary (Canada)

2013-07-01T23:59:59.000Z

68

Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness  

SciTech Connect (OSTI)

This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

Vesely, W.E.; Rezos, J.T. [Science Applications International Corp., Dublin, OH (United States)

1995-09-01T23:59:59.000Z

69

STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

Fischer, Emily V.

70

Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces  

SciTech Connect (OSTI)

Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

Boone, A.G.; Jimenez, G.; Castillo, J. [Altos Hornos de Mexico, Monclova (Mexico)

1997-12-31T23:59:59.000Z

71

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

72

304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance Planning and  

E-Print Network [OSTI]

304 IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 2, JUNE 2005 Integrating Preventive Maintenance & Conclusions--Preventive maintenance planning, and production scheduling are two activities that are inter-depen- dent but most often performed independently. Considering that preventive maintenance, and repair affect

Kutanoglu, Erhan

73

Maintenance FUSION IGNITION RESEARCH EXPERIMENT  

E-Print Network [OSTI]

Insulation Enclosure Remote Maintenance Module FUSION IGNITION RESEARCH EXPERIMENT SYSTEM describes the status of the configuration development and the integration of the major subsystem components vessel structural stiffness, this configuration makes use of the cooling jacket as nuclear shielding

74

Home Maintenance Manual.  

E-Print Network [OSTI]

they become serious. The accompanying home maintenance plan is one way of setting up a regular inspection program. The checklist suggests maintenance and the best time to inspect. Revise or add to this checklist to meet your needs. HOME MAINTENANCE...

Anonymous,

1985-01-01T23:59:59.000Z

75

INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT  

SciTech Connect (OSTI)

The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

2004-09-01T23:59:59.000Z

76

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

77

Intelligent pothole repair vehicle  

E-Print Network [OSTI]

This thesis presents an endeavor to design and construct a prototype of an automated road repair vehicle called the Intelligent Pothole Repair Vehicle (IPRV). The IPRV is capable of automatically detecting and filling potholes on road surfaces...

Minocher Homji, Ruzbeh Adi

2006-10-30T23:59:59.000Z

78

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

79

Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability  

SciTech Connect (OSTI)

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

NSTec Mission and Projects Division

2010-09-30T23:59:59.000Z

80

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

82

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

83

Optimizing Preventive Maintenance Models  

E-Print Network [OSTI]

Optimizing Preventive Maintenance Models. Michael Bartholomew-Biggs. School of Physics Astronomy and Mathematics, University of Hertfordshire.

84

HFIR Plant Maintenance - August  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

connections are nearly complete: -Vacuum system: Major leaks have been repaired, second turbo pump connection complete -RF Helicon system: New water-cooled antenna connection...

85

Electric vehicle repairs and modifications  

SciTech Connect (OSTI)

This informal report describes the electric vehicle (EV) inspection and the necessary maintenance and repairs required to improve reliable operation of five Volkswagen (VW) Electrotransporter vans and five VW EV buses. The recommendations of TVA, EPRI, GES, Volkswagen, Siemens, and Hoppecke have been carried out in this effort. These modifications were necessary before entering the EPRI/TVA phase II and III continuing program. As new energy storage systems are explored using the VW test-bed vehicles in the battery field testing program, additional modifications may be required. All modifications will be submitted to the vehicle and component manufacturer for general assessment and recommendations. At present three different types of battery systems are being evaluated in six VW vehicles. The two Hoppecke and Exide utilize the modified Hoppecke charging systems. The other batteries being tested require off-board chargers specified by their manufacturer and are separate from the vehicle system.

Buffett, R.K.

1982-11-01T23:59:59.000Z

86

Microelectronics Reliability, Vol. 47, No. 12, pp. 1889-1901, Dec. 2007 A Maintenance Planning and Business Case Development Model for the  

E-Print Network [OSTI]

Microelectronics Reliability, Vol. 47, No. 12, pp. 1889-1901, Dec. 2007 1 A Maintenance Planning) to Electronic Systems Peter A. Sandborn, Chris Wilkinson CALCE Electronic Products and Systems Center Department into maintenance policies and decisions that minimize life cycle costs, or maximize availability or some other

Sandborn, Peter

87

DIESEL/HEAVY The diesel/heavy equipment certificate offers training in maintenance  

E-Print Network [OSTI]

DIESEL/HEAVY EQUIPMENT The diesel/heavy equipment certificate offers training in maintenance and repair of heavy equipment and trucks. Students will learn to work on electrical and air systems, diesel · Small Engines · Automotive Maintenance · Welding · Training for entry level heavy diesel equipment

Ickert-Bond, Steffi

88

Developing a CD-CBM Anticipatory Approach for Cavitation - Defining a Model-Based Descriptor Consistent Across Processes, Phase 1 Final Report Context-Dependent Prognostics and Health Assessment: A New Paradigm for Condition-based Maintenance SBIR Topic No. N98-114  

SciTech Connect (OSTI)

The objective of this research, and subsequent testing, was to identify specific features of cavitation that could be used as a model-based descriptor in a context-dependent condition-based maintenance (CD-CBM) anticipatory prognostic and health assessment model. This descriptor is based on the physics of the phenomena, capturing the salient features of the process dynamics. The test methodology and approach were developed to make the cavitation features the dominant effect in the process and collected signatures. This would allow the accurate characterization of the salient cavitation features at different operational states. By developing such an abstraction, these attributes can be used as a general diagnostic for a system or any of its components. In this study, the particular focus will be pumps. As many as 90% of pump failures are catastrophic. They seem to be operating normally and fail abruptly without warning. This is true whether the failure is sudden hardware damage requiring repair, such as a gasket failure, or a transition into an undesired operating mode, such as cavitation. This means that conventional diagnostic methods fail to predict 90% of incipient failures and that in addressing this problem, model-based methods can add value where it is actually needed.

Allgood, G.O.; Dress, W.B.; Kercel, S.W.

1999-06-01T23:59:59.000Z

89

Repair of overheating linear accelerator  

SciTech Connect (OSTI)

Los Alamos Neutron Science Center (LANSCE) is a proton accelerator that produces high energy particle beams for experiments. These beams include neutrons and protons for diverse uses including radiography, isotope production, small feature study, lattice vibrations and material science. The Drift Tube Linear Accelerator (DTL) is the first portion of a half mile long linear section of accelerator that raises the beam energy from 750 keV to 100 MeV. In its 31st year of operation (2003), the DTL experienced serious issues. The first problem was the inability to maintain resonant frequency at full power. The second problem was increased occurrences of over-temperature failure of cooling hoses. These shortcomings led to an investigation during the 2003 yearly preventative maintenance shutdown that showed evidence of excessive heating: discolored interior tank walls and coper oxide deposition in the cooling circuits. Since overheating was suspected to be caused by compromised heat transfer, improving that was the focus of the repair effort. Investigations revealed copper oxide flow inhibition and iron oxide scale build up. Acid cleaning was implemented with careful attention to protection of the base metal, selection of components to clean and minimization of exposure times. The effort has been very successful in bringing the accelerator through a complete eight month run cycle allowing an incredible array of scientific experiments to be completed this year (2003-2004). This paper will describe the systems, investigation analysis, repair, return to production and conclusion.

Barkley, Walter; Baldwin, William; Bennett, Gloria; Bitteker, Leo; Borden, Michael; Casados, Jeff; Fitzgerald, Daniel; Gorman, Fred; Johnson, Kenneth; Kurennoy, Sergey; Martinez, Alberto; O’Hara, James; Perez, Edward; Roller, Brandon; Rybarcyk, Lawrence; Stark, Peter; Stockton, Jerry

2004-01-01T23:59:59.000Z

90

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

91

Condition assessment methodologies for maintenance and repair decisions  

E-Print Network [OSTI]

be normalized to Gnd: P[T = to i Z = g] = 018 / (018 + 016) = 0. 529 P[T = t( ~ Z = zj&] 0, 471 Those are the posterior probabilities. The new expected losses associated to the actions a, and a, (cf. figure 5) can then be calculated: E[L(ao ~ zo)] = P... of MASTER OF SCIENCE Approved as to style and content by; Glen R. Andersen (Chair of committee) W. Edward Back (Member) I T. P. Y (Member) ytcho Lazarov (Member) hn M. Niedzwecki In rimheadofDep ent) December 1997 Major Subject: Civil...

Bouvier, Charles

2012-06-07T23:59:59.000Z

92

Electric Motor Maintenance & Repair for Long Term Efficiency  

E-Print Network [OSTI]

Energy costs to operate electric motors can be a significant part of an operating budget. For example, a recent survey of California water departments reveals energy costs for pumping and treating water may be 25% of operating costs. Strategies...

Brithinee, W. P.

93

Solar Water Heating System Maintenance and Repair | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »ExchangeDepartmentResolveFuture | DepartmentSo Simple ItHeating

94

Iron production maintenance effectiveness system  

SciTech Connect (OSTI)

In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

1996-12-31T23:59:59.000Z

95

UCSC EMPLOYEE HOUSING APARTMENTS APPLICATION Rental rates include: rent, refuse collection, common area utilities, groundskeeping services, and repairs and  

E-Print Network [OSTI]

area utilities, groundskeeping services, and repairs and maintenance of the Laureate Court complex. Tenants pay for their own utilities (i.e., electricity, gas, water, telephone and cable services). A $750

California at Santa Cruz, University of

96

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

97

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

98

Waste Sampling and Characterization Facility (WSCF). Maintenance Implementation Plan  

SciTech Connect (OSTI)

This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.

Bozich, J.L.

1993-07-01T23:59:59.000Z

99

Rapid road repair vehicle  

DOE Patents [OSTI]

Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

Mara, Leo M. (Livermore, CA)

1999-01-01T23:59:59.000Z

100

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CRAD, Maintenance Assessment Plan  

Broader source: Energy.gov [DOE]

An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

102

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

103

Thermography for Preventive Maintenance and Conservation  

E-Print Network [OSTI]

THERMOGRAPHY FOR PREVENTIVE MAINTENANCE AND CONSERVATION Tony Lopez Southern California Gas Company Los Angles, California The Supply Situation With fuel prices soaring, more and more companies are looking at energy management as a means... years. In the last twenty years, however, other applica tions have been developed for thermography. Some of these include: medicine, nondestructive testi:ng, aerial land mapping, preventive maintenance and conservation. The balance of this paper...

Lopez, T.

1979-01-01T23:59:59.000Z

104

Proceedings of design, repair, and refurbishment of steam turbines  

SciTech Connect (OSTI)

This book reports on the proceedings of design, repair and refurbishment of steam engines. Topics covered include: Advisor/Expert Systems for Steam Turbines; Moisture Effects on the Operating and Performance of Steam Turbines; Turbine Steam Path Development; Repair and Refurbishment of the Electric Generator Components; and Advanced Steam Turbine Designs.

Warnock, A.S. (Lehigh Univ., PA (United States))

1991-01-01T23:59:59.000Z

105

Quality electric motor repair: A guidebook for electric utilities  

SciTech Connect (OSTI)

This guidebook provides utilities with a resource for better understanding and developing their roles in relation to electric motor repair shops and the industrial and commercial utility customers that use them. The guidebook includes information and tools that utilities can use to raise the quality of electric motor repair practices in their service territories.

Schueler, V.; Douglass, J.

1995-08-01T23:59:59.000Z

106

Electric motor model repair specifications  

SciTech Connect (OSTI)

These model repair specifications list the minimum requirements for repair and overhaul of polyphase AC squireel cage induction motors. All power ranges, voltages, and speeds of squirrel cage motors are covered.

NONE

1995-08-01T23:59:59.000Z

107

Maintenance manual for the Beneficial Uses Shipping System cask. Revision 1  

SciTech Connect (OSTI)

This document is the Maintenance Manual for the Beneficial Uses Shipping System (BUSS) cask. These instructions address requirements for maintenance, inspection, testing, and repair, supplementing general information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by the Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

Bronowski, D.R.; Yoshimura, H.R.

1993-05-01T23:59:59.000Z

108

A formal ontology for industrial maintenance  

E-Print Network [OSTI]

strategies (preventive maintenance, predictive maintenance, corrective maintenance), to managing operators1 A formal ontology for industrial maintenance Authors: 1- Dr. Mohamed Hedi KARRAY, LGP The rapid advancement of information and communication technologies has resulted in a variety of maintenance

Boyer, Edmond

109

Window Replacement, Rehabilitation, & Repair Guides - Building...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

110

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

111

CH Packaging Maintenance Manual  

SciTech Connect (OSTI)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests.

Washington TRU Solutions

2002-01-02T23:59:59.000Z

112

At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives  

E-Print Network [OSTI]

At CSUF, we stress the importance of bicycle safety and proper bicycle maintenance. Special incentives and training classes are available for bicycle riders and vehicle drivers alike. Bicycle "Fix-it" Stations A well maintained bicycle is a safer bicycle. Campus bike repair stations offer free tools so

de Lijser, Peter

113

Proposed SOLCOST maintenance activities  

SciTech Connect (OSTI)

This document provides a short description of work that has been accomplished to date and work in progress. A discussion of the program status as it is currently configured follows and finally proposed work by Solar Environmental Engineering Company (SEEC) in its most recently signed contract with the Department of Energy (DOE) is given. Early statements are designed to give the reader a good background so that the suggested SOLCOST maintenance activities will be more easily understood.

none,

1980-01-01T23:59:59.000Z

114

Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

115

Nitrous Oxide Systems Maintenance in Clinical Areas  

E-Print Network [OSTI]

. It specifically speaks to maintenance of nitrous oxide delivery systems, preventive maintenance for house. Arrange with Facilities for regular preventive maintenance and annual performance check of ventilation). b. Provides preventive maintenance on ventilation system as necessary. c. Coordinates annual

Jia, Songtao

116

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 17, 2014 ... maintenance constraints, blending and shared resources. ...... tegrated fixed time interval preventive maintenance and production for schedul-.

2015-02-07T23:59:59.000Z

117

Africa's Transport Infrastructure Mainstreaming Maintenance and...  

Open Energy Info (EERE)

Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management...

118

Motor Repair Tech Brief  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOE TribaltheMyMinutesDepartmentCharacteristics | Motor Repair

119

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

120

Genepool Quarterly Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky Learning Fun withGenepool Quarterly MaintenanceGenepool

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

122

Industrial motor repair in the United States  

SciTech Connect (OSTI)

This report characterizes the motor repair industry in the United States; summarizes current motor repair and testing practice; and identifies barriers to energy motor repair practice and recommends strategies for overcoming those barriers.

Schueler, V.; Leistner, P.; Douglass, J.

1994-09-01T23:59:59.000Z

123

Plant maintenance and plant life extension issue, 2008  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

Agnihotri, Newal (ed.)

2008-03-15T23:59:59.000Z

124

The development of an exemplary plan of social action for the implementation and maintenance of educational television in institutions of higher learning in the United States  

E-Print Network [OSTI]

and school administrators are such highly specialized experts in evaluating new developments in their field that from the many innovations offered they will carefully choose those which seem to provide the greatest potential for teaching. Past studies...

Godwin, Norman Floyd

1969-01-01T23:59:59.000Z

125

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

126

Hot repair of ceramic burner on hot blast stoves at USS/Kobe`s {number_sign}3 blast furnace  

SciTech Connect (OSTI)

During the 1992 reline of the No. 3 blast furnace, three new stoves were constructed. The design of the stoves, equipped with internal ceramic burners, was for providing a hot blast temperature of 2,000 F at a wind rate of 140,000 SCFM. After 3 years the performance had deteriorated so the burners were cleaned. When a second cleaning did not improve the performance of No. 3 blast furnace, it was decided to repair the refractory while still hot. The paper describes the hot repair procedures, taking a stove off for repairs, maintenance heat up during repairs, two stove operation, stove commissioning, repair of a ceramic burner, and wet gas prevention.

Bernarding, T.F.; Chemorov, M.; Shimono, S.; Phillips, G.R.

1997-12-31T23:59:59.000Z

127

Intermediate hearth repair technique at Thyssen Stahl AG  

SciTech Connect (OSTI)

Nowadays various techniques for the fastest possible intermediate repair and/or emplacement of refractory materials above the tuyere level allow a significant extension of furnace campaign life. The latter are hence now exclusively determined by the service life of the hearth. The improvement of hearth monitoring and the estimation of residual brick strength of the refractory lining on the basis of temperature measurements in the hearth enable the location of individual zones of premature wear. These measurement methods, which were developed by Thyssen Stahl AG, aid the decision to undertake selective repair of the hearth. Three areas of repair are differentiated: taphole zone; hearth wall, localized; and hearth wall, extensive. This hearth repair method is described in this report using the example of hearth refurbishing blast furnace 8, Hamborn.

Kowalski, W.; Bachhofen, H.J.; Ruether, P.; Ballewski, T. [Thyssen Stahl AG, Duisburg (Germany)

1996-12-31T23:59:59.000Z

128

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

129

A Tool to Support Knowledge Based Software Maintenance: The Software Service Jonathan I. Maletic  

E-Print Network [OSTI]

]: · Corrective · Perfective · Adaptive · Preventive/ Preservation Corrective maintenance is the correction, and corrective were originally used by Swanson [15]. Preventive maintenance is done to improve the future,8,14,12] and preventive maintenance is rarely done. However, it is assumed that a good software development methodology

Maletic, Jonathan I.

130

Large steam turbine repair: A survey  

SciTech Connect (OSTI)

This report covers a survey taken to document the current state-of-the-art in repairs to large steam turbines. One objective was to provide information to assist utilities in making repair or replacement decisions. The survey revealed that a large number of repairs have been successfully repaired involving both mechanical and welding repair techniques. Repair techniques have been improving in recent years and are being used more frequently. No guidelines or codes exist for the repair of steam turbine components so each repair is primarily controlled by agreement between the utility, contractor and insurer. Types of repairs are reviewed in this report and in addition, the capabilities of various contractors who are currently active in providing repair service. 40 refs., 10 figs., 4 tabs.

Findlan, S.J.; Lube, B. (EPRI Nondestructive Evaluation Center, Charlotte, NC (United States))

1991-07-01T23:59:59.000Z

131

Inspect and Repair Steam Traps  

SciTech Connect (OSTI)

This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

132

Genome-Wide Identification and 3D Modeling of Proteins involved in DNA Damage Recognition and Repair (Final Report)  

SciTech Connect (OSTI)

OAK-B135 DNA Damage Recognition and Repair (DDR and R) proteins play a critical role in cellular responses to low-dose radiation and are associated with cancer. the authors have performed a systematic, genome-wide computational analysis of genomic data for human genes involved in the DDR and R process. The significant achievements of this project include: (1) Construction of the computational pipeline for searching DDR and R genes, building and validation of 3D models of proteins involved in DDR and R; (2) Functional and structural annotation of the 3D models and generation of comprehensive lists of suggested knock-out mutations; (3) Important improvement of macromolecular docking technology and its application to predict the DNA-Protein complex conformation; (4) Development of a new algorithm for improved analysis of high-density oligonucleotide arrays for gene expression profiling; (5) Construction and maintenance of the DNA Damage Recognition and Repair Database; and (6) Producing 14 research papers (10 published and 4 in preparation).

Ruben A. Abagyan, PhD

2004-04-15T23:59:59.000Z

133

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

134

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

135

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work along the Electrical District 5 to Saguaro segment (414 to 585) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal...

136

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

137

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

138

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

. These regions also have high water costs. The Gulf Coast, where water is a minor item, has an average expenditure only slightly greater than half that in West Texas. Average lawn sizes in these two regions are almost identical. Use of com- post, commercial.... Individuals with grasses other than bermuda and St. Augustine spend on the average about 53 percent TARLE 2. TOTALS OF VARIOUS HOME LAWN MAINTENANCE EXPENDITURES WITHIN REGIONS AND FOR THE STATE1 Number of Maintenance items Region households Commercial...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

139

Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects  

SciTech Connect (OSTI)

This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

Wood, A.; Wiehagen, J.

2012-09-01T23:59:59.000Z

140

FOR EMERGENCY CABIN REPAIRS REPORT ITFOR EMERGENCY CABIN REPAIRS REPORT IT IMMEDIATELYIMMEDIATELY TO THE MAINTENANCE SHOP OR ONE OFTO THE MAINTENANCE SHOP OR ONE OF  

E-Print Network [OSTI]

& EMPTY GARBAGE INTO TRASH BINS LOCATED OUTSIDE.LOCATED OUTSIDE. RECYCLE BINS ARE ACROSS FROMRECYCLE BINS IF NOT SURE! NO PETS ARE ALLOWED ON THE STATION!NO PETS ARE ALLOWED ON THE STATION! CAMPFIRES MAY BE BUILT

Minnesota, University of

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Dynamic Scheduling of Maintenance Activities Under Uncertainties  

E-Print Network [OSTI]

of the required treatment. There are mainly two types of maintenance activities: the preventive maintenance, whoseDynamic Scheduling of Maintenance Activities Under Uncertainties Fran¸cois Marmier, Christophe in maintenance services field where the different practical knowledges or skills are their working tools. We

Paris-Sud XI, Université de

142

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

143

Automotive Repair Shops Case Study ME 4171 Automotive Repair Shops  

E-Print Network [OSTI]

shops use a wide range of equipment, chemicals, and raw materials. Available services include welding generated through welding? To repair both minor and major auto body damage, hydraulic equipment and hand are recycled with other waste oil generated on site. Question: 2) Do you expect the equipment oil

144

Operations and Maintenance Manual for Large Aperture Scanner System  

SciTech Connect (OSTI)

Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

Jones, Anthony M.; Hall, Thomas E.

2010-04-08T23:59:59.000Z

145

Opportune maintenance and predictive maintenance decision support douard Thomas, ric Levrat, Benoit Iung, Pierre Cocheteux  

E-Print Network [OSTI]

: When to perform a particular maintenance action? What components should benefit from a preventive maintenance action? Which components should first benefit from a preventive maintenance interventionOpportune maintenance and predictive maintenance decision support Ă?douard Thomas, Ă?ric Levrat

Paris-Sud XI, Université de

146

Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches  

E-Print Network [OSTI]

-based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

147

Polymer nanocomposites for high-temperature composite repair  

SciTech Connect (OSTI)

A novel repair agent for resin-injection repair of advanced high temperature composites was developed and characterized. The repair agent was based on bisphenol E cyanate ester (BECy) and reinforced with alumina nanoparticles. To ensure good dispersion and compatibility with the BECy matrix in nanocomposites, the alumina nanoparticles were functionalized with silanes. The BECy nanocomposites, containing bare and functionalized alumina nanoparticles, were prepared and evaluated for their thermal, mechanical, rheological, and viscoelastic properties. The monomer of BECy has an extremely low viscosity at ambient temperature, which is good for processability. The cured BECy polymer is a highly cross-linked network with excellent thermal mechanical properties, with a high glass transition temperature (T{sub g}) of 270 C and decomposition temperature above 350 C. The incorporation of alumina nanoparticles enhances the mechanical and rheological properties of the BECy nanocomposites. Additionally, the alumina nanoparticles are shown to catalyze the cure of BECy. Characterization of the nanocomposites included dynamic mechanical analysis, differential scanning calorimetry, thermogravimetric analysis, rheological and rheokinetic evaluation, and transmission electron microscopy. The experimental results show that the BECy nanocomposite is a good candidate as repair agent for resin-injection repair applications.

Sheng, Xia

2008-12-01T23:59:59.000Z

148

Verification of Motor Repair Quality  

E-Print Network [OSTI]

Motor testing at Advanced Energy has shown that a motor that has not suffered irreparable damage as a result of failure can be repaired to perform as well as before the failure. But the only way to achieve the performance level of an energy...

Butler, K.

149

DNA Repair Alterations in Children With Pediatric Malignancies: Novel Opportunities to Identify Patients at Risk for High-Grade Toxicities  

SciTech Connect (OSTI)

Purpose: To evaluate, in a pilot study, the phosphorylated H2AX ({gamma}H2AX) foci approach for identifying patients with double-strand break (DSB) repair deficiencies, who may overreact to DNA-damaging cancer therapy. Methods and Materials: The DSB repair capacity of children with solid cancers was analyzed compared with that of age-matched control children and correlated with treatment-related normal-tissue responses (n = 47). Double-strand break repair was investigated by counting {gamma}H2AX foci in blood lymphocytes at defined time points after irradiation of blood samples. Results: Whereas all healthy control children exhibited proficient DSB repair, 3 children with tumors revealed clearly impaired DSB repair capacities, and 2 of these repair-deficient children developed life-threatening or even lethal normal-tissue toxicities. The underlying mutations affecting regulatory factors involved in DNA repair pathways were identified. Moreover, significant differences in mean DSB repair capacity were observed between children with tumors and control children, suggesting that childhood cancer is based on genetic alterations affecting DSB repair function. Conclusions: Double-strand break repair alteration in children may predispose to cancer formation and may affect children's susceptibility to normal-tissue toxicities. Phosphorylated H2AX analysis of blood samples allows one to detect DSB repair deficiencies and thus enables identification of children at risk for high-grade toxicities.

Ruebe, Claudia E., E-mail: claudia.ruebe@uks.e [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany); Fricke, Andreas; Schneider, Ruth; Simon, Karin; Kuehne, Martin; Fleckenstein, Jochen [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany); Graeber, Stefan [Institute of Medical Biometrics, Epidemiology and Medical Informatics, Saarland University, Homburg/Saar (Germany); Graf, Norbert [Department of Pediatric Hematology and Oncology, Saarland University, Homburg/Saar (Germany); Ruebe, Christian [Department of Radiation Oncology, Saarland University, Homburg/Saar (Germany)

2010-10-01T23:59:59.000Z

150

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

151

Heat Flow Database Expansion for NGDS Data Development, Collection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU) Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU)...

152

Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3  

SciTech Connect (OSTI)

This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes.

Meldrom, C.A.

1996-03-01T23:59:59.000Z

153

Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM)  

Broader source: Energy.gov [DOE]

Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND...

154

46 September 2011Vol. 23 No. 3Engineering Management Journal A Budget-SensitiveApproach to Scheduling Maintenance  

E-Print Network [OSTI]

in significantly higher costs. It has been empirically shown that preventive maintenance can reduce the frequency the need to reduce lost production costs due to equipment failures with preventive maintenance costs. Managers do this by developing preventative maintenance schedules. Most statistical models in reliability

Gosavi, Abhijit

155

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

156

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

157

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

158

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

159

Use of CFRP Overlays to Repair Fatigue Damage in Steel Bridge Girders and Components  

E-Print Network [OSTI]

Fatigue damage in steel girder bridges built prior to the mid-1980s is common due to distortion-induced fatigue. Different repair techniques have been developed and implemented to retrofit bridges of this era with existing fatigue damage...

Gangel, Regan Elisabeth

2012-05-31T23:59:59.000Z

160

Mining Surveillance and Maintenance Dollars  

SciTech Connect (OSTI)

Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S&M) activities. However, ongoing S&M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations.

MARTINEZ, R.

2000-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Maintenance and Prevention: Formalization and Fixpoint Characterization  

E-Print Network [OSTI]

Maintenance and Prevention: Formalization and Fixpoint Characterization Munindar P. Singh Maintenance and prevention are important concepts in the science of intel­ ligent systems, yet serious research attention. Maintenance and prevention are duals of each other, but cannot be reduced

162

ROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE  

E-Print Network [OSTI]

activities: the preventive maintenance, whose activities can be long term planned, and the correctiveROBUSTNESS MEASURE FOR FUZZY MAINTENANCE ACTIVITIES SCHEDULE François MARMIER , Christophe VARNIER. Especially in the field of maintenance services where the different practical knowledge or skills

Paris-Sud XI, Université de

163

Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing  

E-Print Network [OSTI]

1 Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Xiaodong Yao, Emmanuel on Control Applications in 2001. #12;2 Abstract Preventive Maintenance (PM) scheduling is a very challenging schedule with that of a baseline reference schedule are also presented. Index Terms preventive maintenance

Marcus, Steven I.

164

Prognostics for the Maintenance of Distributed Systems  

E-Print Network [OSTI]

but also higher level function prognosis. I. INTRODUCTION In the classical case, preventive maintenance of preventive maintenance for complex systems. In this sense, a distributed system can be split down into a setPrognostics for the Maintenance of Distributed Systems Pauline Ribot, Yannick Pencol´e and Michel

Pencolé, Yannick

165

STANDARD OPERATING PROCEDURES Annual Site Maintenance  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

Fischer, Emily V.

166

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

167

National Synchrotron Light Source Facility Manual Maintenance Management Program. Revision 1  

SciTech Connect (OSTI)

The purpose of this program s to meet the policy and objectives for the management and performance of cost-effective maintenance and repair of the National Synchrotron Light Source, as required by the US Department of Energy order DOE 433O.4A. It is the DOE`s policy that: The maintenance management program for the NSLS be consistent with this Order and that NSLS property is maintained in a manner which promotes operational safety, worker health, environmental protection and compliance, property preservation, and cost-effectiveness while meeting the NSLS`s programmatic mission. Structures, components and systems (active and passive) that are imporant to safe operation of the NSLS shall be subject to a maintenance program to ensure that they meet or exceed their design requirements throughout the life of the NSLS. Periodic examination of structures, systems components and equipment be performed to determine deterioration or technical obsolescence which may threaten performance and/or safety. Primary responsibility, authority, and accountability for the direction and management of the maintenance program at the NSLS reside with the line management assigned direct programmatic responsibility. Budgeting and accounting for maintenance programs are consistent with DOE Orders guidance.

Fewell, N.

1993-12-01T23:59:59.000Z

168

A cask maintenance facility feasibility study  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1989-01-01T23:59:59.000Z

169

Transportation cask decontamination and maintenance at the potential Yucca Mountain repository; Yucca Mountain Site characterization project  

SciTech Connect (OSTI)

This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.

Hartman, D.J.; Miller, D.D. [Bechtel National, Inc., San Francisco, CA (United States); Hill, R.R. [Sandia National Labs., Albuquerque, NM (United States)

1992-04-01T23:59:59.000Z

170

Operating Policy for Facilities This policy establishes responsibility for the actual repair, maintenance, renovation, remodeling,  

E-Print Network [OSTI]

by various state or federal agencies (including the State Division of Capital Asset Management - DCAM), union agreements, state or federal statues, local ordinances, and requirements imposed by other regulatory agencies, fabrication, installation, or alteration of utility service systems including electrical, gas, water, sewer

Massachusetts at Amherst, University of

171

E-Print Network 3.0 - aircraft maintenance repair Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Soviet Source: Fuerschbach, Phillip - Joining and Coating Department, Materials and Process Sciences Center, Sandia National Laboratories Collection: Materials Science 100...

172

Fabrication Flaw Density and Distribution In Repairs to Reactor Pressure Vessel and Piping Welds  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory is developing a generalized fabrication flaw distribution for the population of nuclear reactor pressure vessels and for piping welds in U.S. operating reactors. The purpose of the generalized flaw distribution is to predict component-specific flaw densities. The estimates of fabrication flaws are intended for use in fracture mechanics structural integrity assessments. Structural integrity assessments, such as estimating the frequency of loss-of-coolant accidents, are performed by computer codes that require, as input, accurate estimates of flaw densities. Welds from four different reactor pressure vessels and a collection of archived pipes have been studied to develop empirical estimates of fabrication flaw densities. This report describes the fabrication flaw distribution and characterization in the repair weld metal of vessels and piping. This work indicates that large flaws occur in these repairs. These results show that repair flaws are complex in composition and sometimes include cracks on the ends of the repair cavities. Parametric analysis using an exponential fit is performed on the data. The relevance of construction records is established for describing fabrication processes and product forms. An analysis of these records shows there was a significant change in repair frequency over the years when these components were fabricated. A description of repair flaw morphology is provided with a discussion of fracture mechanics significance. Fabrication flaws in repairs are characterized using optimized-access, high-sensitivity nondestructive ultrasonic testing. Flaw characterizations are then validated by other nondestructive evaluation techniques and complemented by destructive testing.

GJ Schuster, FA Simonen, SR Doctor

2008-04-01T23:59:59.000Z

173

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao  

E-Print Network [OSTI]

Optimal Joint Preventive Maintenance and Production Policies* Xiaodong Yao SAS Institute Inc. Cary preventive maintenance (PM) and production policies for an unreliable production-inventory system in which to establish some additional structural properties. Keywords: optimal preventive maintenance, joint maintenance

Marcus, Steven I.

174

Winter Performance and Maintenance of Porous Asphalt Pavements  

E-Print Network [OSTI]

Concrete (HSG-B)Porous Asphalt (HSG-C) #12;Cold Climate Performance Results #12;12 Porous Asphalt SurfaceWinter Performance and Maintenance of Porous Asphalt Pavements Robert M. Roseen, Ph.D., P.E., D impacts for new development and reverse impacts in areas with redevelopment. #12;Porous Asphalt Design

175

Development of a Software SecurityAssessment Instrument to Reduce Software SecurityRisk  

E-Print Network [OSTI]

system, has vulnerabilities. (SAT) for use in the software development and maintenance life cycle throughout the sofhvare development and maintenance life cycle. The. security assessment instrument includes security assessment for use in the software development and maintenance life cycle. Currently

Bishop, Matt

176

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling Problem in the Robustness  

E-Print Network [OSTI]

A Study of Maintenance Contribution to a Joint Production and Preventive maintenance Scheduling production and Preventive Maintenance (PM) scheduling problem in the robustness framework. The contributions equipment reliability and performance loss under disruption Key words: Production, Preventive maintenance

Paris-Sud XI, Université de

177

Role of DNA repair protein ERCC1 in skin cancer   

E-Print Network [OSTI]

Nucleotide excision repair (NER) is one of the major repair systems for removal of DNA lesions. The NER pathway has evolved mainly to repair UV-induced DNA damage and is also active against a broad range of endogenously ...

Song, Liang

2009-01-01T23:59:59.000Z

178

Automotive Repair by Number Theory Bart Snapp and Chris Snapp  

E-Print Network [OSTI]

Automotive Repair by Number Theory Bart Snapp and Chris Snapp While repairing the ignition switch on a 1981 Fiat Spider, we discovered the following connection between number theory and automotive repair

Snapp, Bart

179

The feasibility of electrophoretic repair of impoundment leaks  

E-Print Network [OSTI]

finding, repairing and testing the leaks, are tedious, expensive, and dangerous to workers. Electrophoretic repair technique is an innovative, economic, and safe method to repair the leakage of impoundments. A suspension of clay particles is induced...

Han, Ji-Seok

2002-01-01T23:59:59.000Z

180

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

182

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

183

BPAT Systems Maintenance - February 9, 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's...

184

BPAT Systems Maintenance - December 12, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's...

185

BPAT Systems Maintenance - November 5, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's...

186

FAQS Reference Guide – Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

187

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network [OSTI]

Nov 30, 2014 ... Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: a Mine Planning Case Study. Christina N Burt ...

Christina N Burt

2014-11-30T23:59:59.000Z

188

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

is carried to understand the importance of model parameters in obtaining optimal maintenance strategies. The analysis covers the effect of inspection rate calculated for each stage and its impact on failure probability, inspection cost, maintenance cost...

Natti, Satish

2010-01-14T23:59:59.000Z

189

Section 6 -Facilities Usage and Maintenance A. Facilities Usage and Maintenance  

E-Print Network [OSTI]

Section 6 - Facilities Usage and Maintenance A. Facilities Usage and Maintenance 1 be held financially responsible. Financial responsibility extends to abandoned belongings, excessive is not permitted under any circumstances. Storage facilities are provided in most student housing units for storing

Pantaleone, Jim

190

GENETIC AND MOLECULAR ANALYSIS OF DNA DAMAGE REPAIR AND TOLERANCE PATHWAYS.  

SciTech Connect (OSTI)

Radiation can damage cellular components, including DNA. Organisms have developed a panoply of means of dealing with DNA damage. Some repair paths have rather narrow substrate specificity (e.g. photolyases), which act on specific pyrimidine photoproducts in a specific type (e.g., DNA) and conformation (double-stranded B conformation) of nucleic acid. Others, for example, nucleotide excision repair, deal with larger classes of damages, in this case bulky adducts in DNA. A detailed discussion of DNA repair mechanisms is beyond the scope of this article, but one can be found in the excellent book of Friedberg et al. [1] for further detail. However, some DNA damages and paths for repair of those damages important for photobiology will be outlined below as a basis for the specific examples of genetic and molecular analysis that will be presented below.

SUTHERLAND, B.M.

2001-07-26T23:59:59.000Z

191

Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

Kirschner, Denise

192

Void Fraction Instrument operation and maintenance manual  

SciTech Connect (OSTI)

This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

1994-09-01T23:59:59.000Z

193

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

194

Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects  

E-Print Network [OSTI]

that affect pavement performances; 2) develop a stochastic model that predicts future maintenance costs of flexible-type pavement in Texas. The study data were gathered through the Pavement Management Information System (PMIS) containing more than 190...

Kim, Yoo Hyun

2012-07-16T23:59:59.000Z

195

Production and maintenance planning for electricity generators: modeling and application to Indian power systems  

E-Print Network [OSTI]

Production and maintenance planning for electricity generators: modeling and application to Indian power systems Debabrata Chattopadhyay Department of Management, University of Canterbury, Private Bag describes the development of an optimization model to perform the fuel supply, electricity generation

Dragoti-Ă?ela, Eranda

196

Desired outcomes, unexpected processes : two stories of sanitation maintenance in Erode tenements, India  

E-Print Network [OSTI]

A central challenge facing municipalities in developing countries is the successful maintenance of sanitation services for their urban poor. Not only are municipalities struggling to cope with increased sanitation coverage ...

Balakrishnan, Sai

2008-01-01T23:59:59.000Z

197

Somatic Sex Determination in D. melanogaster: Insights in the Establishment to Maintenance Transition  

E-Print Network [OSTI]

regulatory gene Sexlethal (Sxl). Expression of Sxl is initially accomplished only in females through activation of the establishment promoter SxlPe. Later in development, Sxl is transcribed in both sexes through a maintenance promoter, SxlPm, but functional...

Gonzalez Rojos, Alejandra Noemi

2012-07-16T23:59:59.000Z

198

Risk based optimization of the frequency of EDG on-line maintenance at Hope Creek  

SciTech Connect (OSTI)

This paper presents a study to optimize the frequency of on-line maintenance of the emergency diesel generators at Hope Creek. This study was directed towards identifying, analyzing, and modifying maintenance planning and scheduling practices to assure the high availability of emergency diesel generators. Input from application of a recently developed reliability model, from considerations of probabilistic safety assessment, plant-specific experience, insights from personnel involved in EDG maintenance, and other practical issues were used to define a maintenance schedule that balances its beneficial and adverse impacts. Conclusions resulted in feasible recommendations to optimize and reduce the frequency of diesel on-line maintenance, allowing additional resources to better maintain other equipment important to safety.

Knoll, A. [Public Service Electric & Gas, Hancocks Bridge, NJ (United States); Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States); Vesely, W.E. [Science Applications International, Dublin, OH (United States)

1996-09-01T23:59:59.000Z

199

Functional Prognostic Architecture for the Maintenance of Complex Systems  

E-Print Network [OSTI]

their functions by new ones. In order to optimize the maintenance cost, it is necessary to perform preventive maintenance to prevent failure occur- rence. Preventive maintenance actions consist in replacing components the date of the next scheduled maintenance phase. In the classical case, preventive maintenance is only

Pencolé, Yannick

200

Diagnosis and prognosis for the maintenance of complex systems  

E-Print Network [OSTI]

--Diagnosis, prognosis, preventive maintenance, complex systems. I. INTRODUCTION Nowadays, system maintenance is a key to decrease the maintenance cost, it is necessary to perform preventive maintenance [3], [4], [5] which alsoDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1

Pencolé, Yannick

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CATASTROPHIC REPAIR REQUEST CHECKLIST Office of Research  

E-Print Network [OSTI]

Not Meet Policy Not Sure Equipment may not be covered by a service contract that provides for repair Contacted: ______________ Amount of Annual Service Contract: $ ___________ Meets Policy Info Pending Does

Schladow, S. Geoffrey

202

Vehicle Repair Policy Outline the policy regarding vehicle repair on University of Michigan (U-M) vehicles.  

E-Print Network [OSTI]

Vehicle Repair Policy Objective Outline the policy regarding vehicle repair on University of Michigan (U-M) vehicles. Policy 1. All vehicle repairs performed on U-M vehicles must be coordinated facility to repair their fleet vehicles. 2. U-M vehicles leased through Fleet Services include routine

Kirschner, Denise

203

Optimization models for improving periodic maintenance schedules by utilizing opportunities  

E-Print Network [OSTI]

to this as preventive maintenance activities at an oppor- tunity. The original opportunistic replacement problemOptimization models for improving periodic maintenance schedules by utilizing opportunities Torgny of Technology Abstract We present mathematical models for finding optimal opportunistic maintenance schedules

Patriksson, Michael

204

Modelling maintenance for components under competing risk Helge Langseth  

E-Print Network [OSTI]

preventively maintained. The preventive maintenance (PM) is performed periodically with some period , but PMModelling maintenance for components under competing risk Helge Langseth Norwegian University the mathematical modelling of imperfect maintenance of a system under competing risk. The model we propose

Langseth, Helge

205

Condition-Based Maintenance via Simulation and a Targeted Bayesian  

E-Print Network [OSTI]

malfunctioning. Accordingly, it is essential to undertake an effective preventive maintenance (PM) policyCondition-Based Maintenance via Simulation and a Targeted Bayesian Network Metamodel Aviv Gruber, Israel ABSTRACT Condition-based maintenance (CBM) is increasingly applied to operational systems

Ben-Gal, Irad E.

206

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

207

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

208

Developing a risk management "flight simulator" for manned space programs : a user interface to a system dynamic simulation of system safety at NASA  

E-Print Network [OSTI]

Simulators are a staple of any engineering project and manned space flight in particular. From pilot and crew training to maintenance and emergency repairs, very little is done without it first being thoroughly practiced ...

Friedenthal, Stephen R. (Stephen Roger)

2006-01-01T23:59:59.000Z

209

Exposure Evaluation for Benzene, Lead and Noise in Vehicle and Equipment Repair Shops  

SciTech Connect (OSTI)

An exposure assessment was performed at the equipment and vehicle maintenance repair shops operating at the U. S. Department of Energy Hanford site, in Richland, Washington. The maintenance shops repair and maintain vehicles and equipment used in support of the Hanford cleanup mission. There are three general mechanic shops and one auto body repair shop. The mechanics work on heavy equipment used in construction, cranes, commercial motor vehicles, passenger-type vehicles in addition to air compressors, generators, and farm equipment. Services include part fabrication, installation of equipment, repair and maintenance work in the engine compartment, and tire and brake services. Work performed at the auto body shop includes painting and surface preparation which involves applying body filler and sanding. 8-hour time-weighted-average samples were collected for benzene and noise exposure and task-based samples were collected for lead dust work activities involving painted metal surfaces. Benzene samples were obtained using 3M™ 3520 sampling badges and were analyzed for additional volatile organic compounds. These compounds were selected based on material safety data sheet information for the aerosol products used by the mechanics for each day of sampling. The compounds included acetone, ethyl ether, toluene, xylene, VM&P naphtha, methyl ethyl ketone, and trichloroethylene. Laboratory data for benzene, VM&P naphtha, methyl ethyl ketone and trichloroethylene were all below the reporting detection limit. Airborne concentrations for acetone, ethyl ether, toluene and xylene were all less than 10% of their occupational exposure limit. The task-based samples obtained for lead dusts were submitted for a metal scan analysis to identify other metals that might be present. Laboratory results for lead dusts were all below the reporting detection limit and airborne concentration for the other metals observed in the samples were less than 10% of the occupational exposure limit. Noise dosimetry sampling was performed on a random basis and was representative of the different work activities within the four shops. Twenty three percent of the noise samples exceeded the occupational exposure limit of 85 decibels for an 8-hour time-weightedaverage. Work activities where noise levels were higher included use of impact wrenches and grinding wheels.

Sweeney, Lynn C.

2013-04-10T23:59:59.000Z

210

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

211

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

212

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

213

Project Profile: Innovative Application of Maintenance-Free Phase...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal...

214

A case model for predictive maintenance  

E-Print Network [OSTI]

This project is to respond to a need by Varian Semiconductor Equipment Associates, Inc. (VSEA) to help predict failure of ion implanters. Predictive maintenance would help to reduce the unscheduled downtime of ion implanters, ...

Li, Jiawei, M. Eng. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

215

Maintenance expo................... 3 Georgia visitors....................... 3  

E-Print Network [OSTI]

Inside · Maintenance expo................... 3 · Georgia visitors....................... 3 · Fluid Power Center ................ 4 · CTS services Web page .......... 4 A monthly report on transportation transformation of nation's transportation policy The results of a 13-month study led by David Kittelson

Minnesota, University of

216

Risk impact of maintenance program changes  

E-Print Network [OSTI]

This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

Credit, Kimberly A. (Kimberly April)

1992-01-01T23:59:59.000Z

217

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

218

Optimizing Installation, Operation, and Maintenance at Offshore...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

219

Significantly reduce maintenance time Documents&Mediabecomesthekey  

E-Print Network [OSTI]

Significantly reduce maintenance time · Documents&Mediabecomesthekey contactforallmaintenanceneeds. · MajorpartsarestoredbyDocuments& MediaattheMissionCenter.Thisreduces thetimeneededtoorderpartsandresultsin&Mediaoffersthecampus communityaconvenientandeconomicsolution foritscopiers,multifunctiondevicesandprinter needs. Print Management Program advantages Reduce

Mullins, Dyche

220

E-Print Network 3.0 - annular repair strategies Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- lowing a user to create custom repair strategies. ReAssert used a five-step repair process around its... library of repair ... Source: Marinov, Darko - Department of...

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

INTERNAL REPAIR OF GAS PIPLINES SURVEY OF OPERATOR EXPERIENCE AND INDUSTRY NEEDS REPORT  

SciTech Connect (OSTI)

A repair method that can be applied from the inside of a gas transmission pipeline (i.e., a trenchless repair) is an attractive alternative to conventional repair methods since the need to excavate the pipeline is precluded. This is particularly true for pipelines in environmentally sensitive and highly populated areas. The objectives of the project are to evaluate, develop, demonstrate, and validate internal repair methods for pipelines; develop a functional specification for an internal pipeline repair system; and prepare a recommended practice for internal repair of pipelines. The purpose of this survey is to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. A total of fifty-six surveys were sent to pipeline operators. A total of twenty completed surveys were returned, representing a 36% response rate, which is considered very good given the fact that tailored surveys are known in the marketing industry to seldom attract more than a 10% response rate. The twenty survey responses produced the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water (e.g., lakes and swamps) in difficult soil conditions, under highways, under congested intersections, and under railway crossings. All these areas tend to be very difficult and very costly if, and where, conventional excavated repairs may be currently used. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem in a water/river crossing. (3) The typical travel distances required can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). In concept, these groups require pig-based systems; despooled umbilical systems could be considered for the first two groups. For the last group a self-propelled system with an onboard self-contained power and welding system is required. (4) Pipe size range requirements range from 50.8 mm (2 in.) through 1,219.2 mm (48 in.) in diameter. The most common size range for 80% to 90% of operators surveyed is 508 mm to 762 mm (20 in. to 30 in.) diameter, with 95% using 558.8 mm (22 in.) diameter pipe.

Ian D. Harris

2003-09-01T23:59:59.000Z

222

DNA repair efficiency in germ cells and early mouse embryos and consequences for radiation-induced transgenerational genomic damage  

SciTech Connect (OSTI)

Exposure to ionizing radiation and other environmental agents can affect the genomic integrity of germ cells and induce adverse health effects in the progeny. Efficient DNA repair during gametogenesis and the early embryonic cycles after fertilization is critical for preventing transmission of DNA damage to the progeny and relies on maternal factors stored in the egg before fertilization. The ability of the maternal repair machinery to repair DNA damage in both parental genomes in the fertilizing egg is especially crucial for the fertilizing male genome that has not experienced a DNA repair-competent cellular environment for several weeks prior to fertilization. During the DNA repair-deficient period of spermatogenesis, DNA lesions may accumulate in sperm and be carried into the egg where, if not properly repaired, could result in the formation of heritable chromosomal aberrations or mutations and associated birth defects. Studies with female mice deficient in specific DNA repair genes have shown that: (i) cell cycle checkpoints are activated in the fertilized egg by DNA damage carried by the sperm; and (ii) the maternal genotype plays a major role in determining the efficiency of repairing genomic lesions in the fertilizing sperm and directly affect the risk for abnormal reproductive outcomes. There is also growing evidence that implicates DNA damage carried by the fertilizing gamete as a mediator of postfertilization processes that contribute to genomic instability in subsequent generations. Transgenerational genomic instability most likely involves epigenetic mechanisms or error-prone DNA repair processes in the early embryo. Maternal and embryonic DNA repair processes during the early phases of mammalian embryonic development can have far reaching consequences for the genomic integrity and health of subsequent generations.

Marchetti, Francesco; Wyrobek, Andrew J.

2009-01-18T23:59:59.000Z

223

Pressure maintenance in a volatile oil reservoir  

E-Print Network [OSTI]

PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

Schuster, Bruce Alan

1989-01-01T23:59:59.000Z

224

Optimal Preventive Maintenance Under Decision Dependent Uncertainty  

SciTech Connect (OSTI)

We analyze a system of N components with dependent failure times. The goal is to obtain the optimal block replacement interval (different for each component) over a finite horizon that minimizes the expected total maintenance cost. In addition, we allow each preventive maintenance action to change the future joint failure time distribution. We illustrate our methodology with an example from South Texas Project Nuclear Operating Company. (authors)

Galenko, Alexander; Popova, Elmira [University of Texas at Austin, 1 University Station, Austin, Texas 78712 (United States); Kee, Ernie; Grantom, Rick [South Texas Project Nuclear Operating Company - STPNOC, P.O. Box 289, Wadsworth, Tx 77483 (United States)

2006-07-01T23:59:59.000Z

225

Fabrication Flaws in Reactor Pressure Vessel Repair Welds  

SciTech Connect (OSTI)

This paper describes the fabrication flaw distribution and characterization in the repair weld metal of reactor pressure vessels. This work indicates that the large flaws occur in these repairs. These results show that repair flaws are complex in composition and sometimes include cracks on the repair ends. Parametric analysis using an exponential fit is performed on the data. A description of repair flaw morphology is provided. Fabrication flaws in repairs are characterized using high sensitivity nondestructive ultrasonic testing, validation by other nondestructive evaluation (NDE) techniques, and complemented by destructive testing.

Schuster, George J.; Doctor, Steven R.

2007-12-01T23:59:59.000Z

226

INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005  

SciTech Connect (OSTI)

This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

D. R. Fitch

2005-09-22T23:59:59.000Z

227

Regular Inspection and Maintenance Guidance for Porous Pavements  

E-Print Network [OSTI]

non-design loads. Damaged areas may be repaired by use of infrared heating and rerolling of pavement

228

Kevin P. Boggs || Office of Technology Transfer || 901.678.1712 || kpboggs@memphis.edu Novel Material Improves and Streamlines Repair of Peripheral Nerves  

E-Print Network [OSTI]

. A significant alternative to suturing peripheral nerve injuries, an aerogel-based implant uniquely destination. "It is my opinion that the development of the multidimensional aerogel based nerve repair device boards, an aerogel-based peripheral nerve repair approach applies the functionality of a circuit board

Dasgupta, Dipankar

229

CleanFleet. Final report: Volume 3, vehicle maintenance and durability  

SciTech Connect (OSTI)

CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

NONE

1995-12-01T23:59:59.000Z

230

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

231

Repairable chip bonding/interconnect process  

DOE Patents [OSTI]

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules is disclosed. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder. 10 figs.

Bernhardt, A.F.; Contolini, R.J.; Malba, V.; Riddle, R.A.

1997-08-05T23:59:59.000Z

232

Towards a maintenance and servicing indicator Pascal Vrignat 1  

E-Print Network [OSTI]

: Preventive Maintenance, Maintenance planning, Hidden Markov Model, Failure detection. 1 Introduction, events may be prevented by applying a correct maintenance policy. Some tankers may not have sunk if some maintenance had been correctly applied. Factory should not have exploded with some preventive control

Boyer, Edmond

233

Kernel spectral clustering for predicting maintenance of industrial machines  

E-Print Network [OSTI]

to deal with sensory faults have been used [1],[2],[3]: corrective maintenance, preventive maintenance the machine fails, it is expensive and safety and environment issues arise. Preventive maintenance is basedKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

234

Grouping maintenance strategy with availability constraint under limited  

E-Print Network [OSTI]

with significant assumptions: maintenance durations are neglected and only one preventive maintenance for eachGrouping maintenance strategy with availability constraint under limited repairmen Phuc Do Van Hai maintenance strategies of multi-component systems by integrating two efficient optimization algorithms

Paris-Sud XI, Université de

235

Performance evaluation of centralized maintenance workshop by using Queuing Networks  

E-Print Network [OSTI]

maintenance types: Preventive maintenance: different actions are programmed in cycle periods; CorrectivePerformance evaluation of centralized maintenance workshop by using Queuing Networks Zineb Simeu: Maintenance workshop integrated in the job-shop system is required in order to maintain the production

Paris-Sud XI, Université de

236

Maintenance and long life of manjemen & pengelolaan dan  

E-Print Network [OSTI]

: SACA&D Maintenance ­ p.6 #12;ensure operability What does this mean? · preventive maintenanceMaintenance and long life of SACA&D manjemen & pengelolaan dan umur panjang Gerard van der Schrier KNMI BMKG: SACA&D Maintenance ­ p.1 #12;Why SACA&D extreme weather and food security Jakarta Post, 10

Stoffelen, Ad

237

Comparison of Selected Model Evaluation Criteria for Maintenance Applications  

E-Print Network [OSTI]

, Louisville, KY 40292, USA Model-based preventive maintenance relies on creating models that can either loss, and as a whole a sluggish system, the focus has shifted to preventive maintenance. Computerized maintenance systems aid in improving the efficiency of maintenance tasks [28]. The approach of preventive

Huang, Samuel H.

238

Optimal Maintenance Scheduling of a Gas Engine Power Plant  

E-Print Network [OSTI]

to carry out preventive maintenance at regular intervals19 . The maintenance schedule affects many short1 Optimal Maintenance Scheduling of a Gas Engine Power Plant using Generalized Disjunctive with parallel units. Gas engines are shutdown according to a regular maintenance plan that limits the number

Grossmann, Ignacio E.

239

Phonemic Categorization and Phonotactic Repair as Parallel Sublexical Processes   

E-Print Network [OSTI]

categorization and phonotactic repair are sublexical and simultaneous; phonotactic repairs themselves depend on coarticulation cues. Such models can be implemented in two different versions: suprasegmental matching, according to which a speech signal is matched...

Ishikawa, Kiyoshi

2014-07-01T23:59:59.000Z

240

maintenance. This research is relevant to opera-tions and maintenance challenges facing aging  

E-Print Network [OSTI]

the need for preventive maintenance or other diagnostic activities on the physical system. Simulationsmaintenance. This research is relevant to opera- tions and maintenance challenges facing aging-benefit of extending the time between overhauls. reducing the probability of a failure in the field. and preventive

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Repairable File and Storage Systems A Dissertation Presented  

E-Print Network [OSTI]

Repairable File and Storage Systems A Dissertation Presented by Ningning Zhu to The Graduate School of the Dissertation Repairable File and Storage System by Ningning Zhu Doctor of Philosophy in Computer Science Stony stream file/storage system. Repairable file/storage system needs to perform two tasks. First it has

Chiueh, Tzi-cker

242

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

243

A Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL-MORELLO*, Noureddine ZERHOUNI*  

E-Print Network [OSTI]

- ing to different strategies (preventive maintenance, predictive maintenance, correc- tive maintenanceA Formal Ontology for Industrial Maintenance Mohamed Hedi KARRAY*, Brigitte CHEBEL of information and communication technol- ogies has resulted in a variety of maintenance support systems

Paris-Sud XI, Université de

244

Visualization of Mismatch Repair in Bacterial Cells  

E-Print Network [OSTI]

We determined the localizations of mismatch repair proteins in living Bacillus subtilis cells. MutS-GFP colocalized with the chromosome in all cells and formed foci in a subset of cells. MutL-GFP formed foci in a subset ...

Smith, Bradley T.

245

Method for mask repair using defect compensation  

DOE Patents [OSTI]

A method for repair of amplitude and/or phase defects in lithographic masks. The method involves modifying or altering a portion of the absorber pattern on the surface of the mask blank proximate to the mask defect to compensate for the local disturbance (amplitude or phase) of the optical field due to the defect.

Sweeney, Donald W. (San Ramon, CA); Ray-Chaudhuri, Avijit K. (Livermore, CA)

2001-01-01T23:59:59.000Z

246

EPA Lead Safety for Renovation, Repair and  

E-Print Network [OSTI]

than 20 f lead-based paint is dis- e exterior. Window replace- onsidered minor mainte- air. If you're of thousands of dollars in fines and put yourself and your company at risk of po- tential lawsuits. 2. ProtectEPA Lead Safety for Renovation, Repair and Painting (RRP) Course Certified Renovators Class

Tennessee, University of

247

Repairing Type Errors in Functional Programs   

E-Print Network [OSTI]

Type systems for programming languages can be used by compilers to reject programs which are found to be unsound and which may, therefore, fail to execute successfully. When a program is rejected the programmer must repair it so that it can be type...

McAdam, Bruce J

248

An emergency response team for membrane repair  

E-Print Network [OSTI]

events, which we focus on here. As discussed later, Ca2+ influx at the site of plasma membrane-fusion events are required to repair a torn plasma membrane, and we propose that this emergency products and the plasma membrane. Reseal or die. Plasma-membrane disruption is a normal event in the life

Kirchhausen, Tomas

249

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

250

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

251

Automatic coke oven heating control system at Burns Harbor for normal and repair operation  

SciTech Connect (OSTI)

An automatic heating control system for coke oven batteries was developed in 1985 for the Burns Harbor No. 1 battery and reported in the 1989 Ironmaking Conference Proceedings. The original system was designed to maintain a target coke temperature at a given production level under normal operating conditions. Since 1989, enhancements have been made to this control system so that it can also control the battery heating when the battery is under repair. The new control system has improved heating control capability because it adjusts the heat input to the battery in response to anticipated changes in the production schedule. During a recent repair of this 82 oven battery, the pushing schedule changed from 102 ovens/day to 88 ovens/day, then back to 102 ovens/day, then to 107 ovens/day. During this repair, the control system was able to maintain the coke temperature average standard deviation at 44 F, with a maximum 75 F.

Battle, E.T.; Chen, K.L. [Bethlehem Steel Corp., Burns Harbor, IN (United States); [Bethlehem Steel Corp., PA (United States)

1997-12-31T23:59:59.000Z

252

Evaluation of bisphenol E cyanate ester for the resin-injection repair of advanced composites  

SciTech Connect (OSTI)

This thesis is a compilation of a general introduction and literature review that ties together the subsequent chapters which consist of two journal articles that have yet to be submitted for publication. The overall topic relates to the evaluation and application of a new class of cyanate ester resin with unique properties that lend it applicable to use as a resin for injection repair of high glass transition temperature polymer matrix composites. The first article (Chapter 2) details the evaluation and optimization of adhesive properties of this cyanate ester and alumina nanocomposites under different conditions. The second article (Chapter 3) describes the development and evaluation of an injection repair system for repairing delaminations in polymer matrix composites.

Wilber Yaote Lio

2009-12-19T23:59:59.000Z

253

Laboratory testing of closure cap repair techniques  

SciTech Connect (OSTI)

Landfill design requires a low permeability closure cap as well as a low permeability liner. The Savannah River Site, in South Carolina, has approximately 85 acres of mixed waste landfills covered with compacted kaolin clay. Maintaining low permeability of the clay cap requires both that the permeability of the compacted clay itself remain low and that the integrity of the barrier be maintained. Barrier breaches typically result from penetration by roots or animals, and especially cracks caused by uneven settling or desiccation. In this study, clay layers, 0.81 m in diameter and 7.6 cm thick, were compacted in 7 lysimeters to simulate closure caps. The hydraulic conductivity of each layer was measured, and the compacted clay layers (CCL`s) were cracked by drying. Then various repair techniques were applied and the effectiveness of each repair was assessed by remeasuring the hydraulic conductivity. Finally the repaired CCL was again dried and measured to determine how the repair responded to the conditions that caused the original failure. For a full report of this investigation see Persoff et al. Six repair techniques have been tested, four of which involve the use of injectable barrier liquids colloidal silica (CS) and polysiloxane (PSX) described below: (I) covering the crack with a bentonite geosynthetic clay liner (GCL), (ii) recompaction of new kaolinite at STD+3 moisture content joined to existing kaolinite that had dried and shrunk, (iii) direct injection of colloidal silica to a crack, (iv) injection of colloidal silica (CS) to wells in an overlying sand layer, (v) direct injection of polysiloxane to a crack, and (vi), injection of polysiloxane (PSX) to wells in an overlying soil layer.

Persoff, P.; Moridis, G. [Lawrence Berkeley National Lab., CA (United States); Tuck, D.M. [Westinghouse Savannah River Company, Aiken, SC (United States)] [and others

1996-10-01T23:59:59.000Z

254

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

255

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

256

Wind Energy Facility Reliability and Maintenance  

E-Print Network [OSTI]

Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

Ding, Yu

257

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

258

SYSTEM APPROACH-BASED BAYESIAN NETWORK TO AID MAINTENANCE OF MANUFACTURING PROCESS  

E-Print Network [OSTI]

for manufacturing systems. In addition, recent works on system safety and Bayesian Networks (BNs) are developedSYSTEM APPROACH-BASED BAYESIAN NETWORK TO AID MAINTENANCE OF MANUFACTURING PROCESS Weber P., Suhner explores a new methodology to develop Bayesian Network-based diagnosis and prognosis aids for manufacturing

Paris-Sud XI, Université de

259

Technical Insights for Saltstone PA Maintenance  

SciTech Connect (OSTI)

The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

2011-07-20T23:59:59.000Z

260

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

WINCO maintenance before and after DOE 4330.4A  

SciTech Connect (OSTI)

This report discusses numerous elements of the maintenance program at the Idaho Chemical Processing Plant (ICPP) which have undergone changes during the last 5 years. Looking back, many of the maintenance program changes prior to 1991 were fragmented. Maintenance program elements were being ratcheted to address specific productivity and safety concerns. The improvements were warranted, but often improvements were implemented without a systematic review of how they impacted other maintenance program elements. After 1990 when WINCO began using the Chapter II guidelines of DOE Order 4330.4A as a maintenance program model, there was a marked improvement in the quality of the maintenance program changes. The post 1990 changes have been part of a systematic plan that has been communicated to all of the maintenance players. The Chapter II guidelines and the maintenance implementation plan (MIP) personnel with a focus for improvement that was missing prior to 1991.

Remsburg, R.E.

1993-04-27T23:59:59.000Z

262

Building 9401-2 Plating Shop Surveillance and Maintenance Plan  

SciTech Connect (OSTI)

This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.

None

1999-05-01T23:59:59.000Z

263

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

264

E-Print Network 3.0 - analyzing maintenance strategies Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OR I GI NAL AR T I C LE Summary: OSA-CBM Preventive maintenance Reliability-centered maintenance 1 Maintenance strategies... and motivations for health monitoring The...

265

A MAINTENANCE MODEL FOR COMPONENTS EXPOSED TO SEVERAL FAILURE MECHANISMS  

E-Print Network [OSTI]

. The preventive maintenance (PM) is performed periodically with some fixed period , but PM can also be performed describe the "goodness" of the maintenance crew; their ability to prevent failures by performing thorough is assumed to undergo preventive maintenance (PM), usually at fixed time periods > 0. In addition

Langseth, Helge

266

Maintenance policy: degradation laws versus Hidden Markov Model availability indicator  

E-Print Network [OSTI]

INTRODUCTION Industrial processes need to be maintained to prevent breakdown. Some years ago, maintenance, logistic... Different kinds of maintenance policy can be applied: preventive or corrective according to manager strategies. In case of preventive maintenance, different strategies should be used like planned

Paris-Sud XI, Université de

267

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

part (McCall, 1963). Then an opportunistic maintenance is any action that combines a preventive`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES E. Levrat, E Vandoeuvre (France) Abstract: Today, a new role for maintenance exists to enhance the eco

Boyer, Edmond

268

Commencement Activities & Facility Maintenance Closures Updated Monday 4/29  

E-Print Network [OSTI]

· Fitness Center & Weight Room equipment cleaning, preventive maintenance, and layout changes #12;Commencement Activities & Facility Maintenance Closures Updated Monday 4/29 Spring Semester Normal Maintenance projects. · The Rec Center will be closed Monday 5/20 ­ Sunday 6/9. · The Rec Center reopens

von der Heydt, RĂĽdiger

269

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies  

E-Print Network [OSTI]

Workforce-Constrained Preventive Maintenance Scheduling using Evolution Strategies ABSTRACT Heavy of minimizing the makespan for a set of preventive maintenance (PM) tasks, requiring single- or multiple approach to the SA approach for this class of PM problems. Subject Area: Preventive Maintenance, Evolution

Terwilliger, Mark

270

Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1  

E-Print Network [OSTI]

when the need is discovered, but a good preventive maintenance program will reduce the number. This fact sheet will emphasize corrective and preventive maintenance procedures for ventilation, evaporativeAE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E

Watson, Craig A.

271

Probabilistic service life prediction and maintenance planning of deteriorating structures  

E-Print Network [OSTI]

life prediction of a bridge pier and to the selection of a suitable preventive maintenance scenario. 1 with an aggressive environment, and to eventually plan a process of essential and/or preventive maintenance, some preventive maintenance scenario. 2 RELIABILITY OF DETERIORATING STRUCTURAL SYSTEMS The deterioration

Garavaglia, Elsa

272

Optimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective  

E-Print Network [OSTI]

. Numerical examples have shown that our model provides a preventive maintenance policy that slows downOptimal Resurfacing Decisions for Road Maintenance: A POMDP Perspective Mariem Zouch, Thomas Yeung / IRCCyN, F-44307 NANTES Cedex, France Keywords: Road deterioration, maintenance optimization, Partially

Boyer, Edmond

273

Optimal Maintenance Scheduling of a Power Plant with Seasonal  

E-Print Network [OSTI]

-Wide Optimization Meeting · Plan preventive maintenance shutdowns ­ Minimize payment for skilled labor ­ Save onlineOptimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro maintenance team doing shutdowns · Shutdown period mandatory after [ , ] h online · Challenging (hard

Grossmann, Ignacio E.

274

IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind  

E-Print Network [OSTI]

from sensors, our research objective is to derive an optimal observation and preventive maintenance TRANSACTIONS ON RELIABILITY 3 ACRONYMS NA no action PM preventive maintenance OB observation CM correctiveIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

Ntaimo, Lewis

275

Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein  

E-Print Network [OSTI]

preventative and corrective maintenance costs, holdings costs, and possibly production costs. An optimal policy. In a conventional preventive maintenance policy, it is typically assumed that the decision maker knows only when, conventional preventive maintenance policies are often one of two types: calendar-based or job

Hasenbein, John

276

Experiment #1 Maintenance of UV/vis Instruments  

E-Print Network [OSTI]

considerably worse than it should be. For these reasons, most companies have a preventive maintenance program that might be included in a preventive maintenance program for a UV-visible spectrometer. Your taskExperiment #1 Maintenance of UV/vis Instruments Objectives: 1. Learn how to use different UV

Nazarenko, Alexander

277

Analysis of Preventive Maintenance in Transactions Based Software Systems  

E-Print Network [OSTI]

Analysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio''. However, it incurs some overhead. The necessity to do preventive maintenance not only in general purpose to illustrate the usefulness and applicability of the models. Keywords: Preventive Maintenance, Transactions

Telek, MiklĂłs

278

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

279

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

280

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

282

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

283

DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE  

SciTech Connect (OSTI)

Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

Watkins, R.; England, J.

2010-05-28T23:59:59.000Z

284

Development of low-maintenance end treatment for concrete barriers  

E-Print Network [OSTI]

these model cylinders was suspect and not used in later analysis. Table 5 summarizes results of static and high-speed dynamic tests of all cylinders tested. Table 6 shows estimated ratios between static and damping energy levels for 0. 30, 0. 45, and 0. 60... 4. FORCES AND BENDING MOMENTS ACTING AT A SECTION OF A THICK WALLED CYLINDER . . . . . , . . . . , . . . . . . . . . . . . 14 5. PREDICTED AND MEASURED STATIC FORCE DEFLECTION CURVES . . . . 21 6. FORCE DEFLECTION CURVE FROM LOW SPEED DYNAMIC TEST...

Sicking, Dean

2012-06-07T23:59:59.000Z

285

The latest development in Corex production and maintenance performance  

SciTech Connect (OSTI)

The Corex tower stands 108.6 meters (356 feet) high and includes the reduction shaft and the melter-gasifier where all of the process functions of reduction, gasification and melting are carried out. Indigenous Thabazimbi lump ore is normally charged into the reduction shaft where it is reduced to direct reduced iron (DRI) with an average metallization degree of 93% by means of reduction gas in counterflow. Test campaigns have also demonstrated the suitability and feasibility of charging South African Sishen lump ore, Brazilian pellets and sinter from Newcastle works into the process for the production of high quality hot metal. The Corex process is more flexible compared to a blast furnace in that the burden composition charged to the melter-gasifier can be changed rapidly. This is because the coal and reduced iron is charged separately into the melting zone. A mixture of non-coking local coals are used as the source of energy for melting and as the reducing agent for the Corex reduction shaft.

Aswegen, C.M. van; Gregory, J.D.; Loetter, G.J. [Iscor Pretoria Works (South Africa). Corex Plant

1995-12-01T23:59:59.000Z

286

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office...  

Broader source: Energy.gov (indexed) [DOE]

O 433.1 DOE Order 425.1C, Startup and Restart of Nuclear Facilities DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities DOE Order 5480.20A, Personnel...

287

Geothermal Data Development, Collection, and Maintenance | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, searchGeauga County,Information(EC-LEDS) |

288

Review of maintenance personnel practices at nuclear power plants  

SciTech Connect (OSTI)

As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

1984-05-01T23:59:59.000Z

289

INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2  

SciTech Connect (OSTI)

The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach.

Spampinato, P.T.; Finn, P.A.; Gohar, Y.; Yang, S.T.; Stasko, R.R.; Morrison, C.; Russell, S.; Shaw, G.; Bussell, G.T.; Watts, R.

1984-01-01T23:59:59.000Z

290

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid  

E-Print Network [OSTI]

Designing a Bayesian Network for Preventive Maintenance from Expert Opinions in a Rapid-Linear Model, Expert Opinion, Complexity Reduction, Maintenance. 1 Introduction Preventive maintenance became essential. Preventive maintenance of a system is taking into account expert knowledge, feedback

Paris-Sud XI, Université de

291

Maintenance decision making tool reaching a compromise between maintainability and reliability performances  

E-Print Network [OSTI]

or scheduled preventive maintenance) to condition-based or predictive maintenance strategies preventive maintenance actions, in the sense that planned production stoppages within this temporal horizonMaintenance decision making tool reaching a compromise between maintainability and reliability

Paris-Sud XI, Université de

292

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

293

Motor Repair Tech Brief | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugust 2012 Monthly ProjectEnterprisesRepair Tech Brief Motor

294

Proactive maintenance initiatives at Argonne National Laboratory-West  

SciTech Connect (OSTI)

In the late 1980`s, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ``mentor`` roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I&C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned.

Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

1995-06-01T23:59:59.000Z

295

Development/Plasticity/Repair Oculomotor Instabilities in Zebrafish Mutant belladonna  

E-Print Network [OSTI]

. Both OKR reversal and SO depend on vision and are contrast sensitive. We built a quantitative model optokinetic response; congenital nystagmus; oculomotor instability; achiasmatic; retinal ganglion cell axons by injecting li- pophilic tracer dyes revealed that all larvae with reversed OKR were achiasmatic (Rick et al

Liu, Shih-Chii

296

2003 Long-Term Surveillance and Maintenance Program Report  

SciTech Connect (OSTI)

Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

None

2004-07-01T23:59:59.000Z

297

Sandia National Laboratories: Operations and Maintenance Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range Radar StationReportsMaintenance

298

Neurological Complications Following Endoluminal Repair of Thoracic Aortic Disease  

SciTech Connect (OSTI)

Open surgery for thoracic aortic disease is associated with significant morbidity and the reported rates for paraplegia and stroke are 3%-19% and 6%-11%, respectively. Spinal cord ischemia and stroke have also been reported following endoluminal repair. This study reviews the incidence of paraplegia and stroke in a series of 186 patients treated with thoracic stent grafts. From July 1997 to September 2006, 186 patients (125 men) underwent endoluminal repair of thoracic aortic pathology. Mean age was 71 years (range, 17-90 years). One hundred twenty-eight patients were treated electively and 58 patients had urgent procedures. Anesthesia was epidural in 131, general in 50, and local in 5 patients. Seven patients developed paraplegia (3.8%; two urgent and five elective). All occurred in-hospital apart from one associated with severe hypotension after a myocardial infarction at 3 weeks. Four of these recovered with cerebrospinal fluid (CSF) drainage. One patient with paraplegia died and two had permanent neurological deficit. The rate of permanent paraplegia and death was 1.6%. There were seven strokes (3.8%; four urgent and three elective). Three patients made a complete recovery, one had permanent expressive dysphasia, and three died. The rate of permanent stroke and death was 2.1%. Endoluminal treatment of thoracic aortic disease is an attractive alternative to open surgery; however, there is still a risk of paraplegia and stroke. Permanent neurological deficits and death occurred in 3.7% of the patients in this series. We conclude that prompt recognition of paraplegia and immediate insertion of a CSF drain can be an effective way of recovering spinal cord function and improving the prognosis.

Morales, J. P.; Taylor, P. R.; Bell, R. E.; Chan, Y. C. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Vascular Surgery (United Kingdom); Sabharwal, T. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Interventional Radiology (United Kingdom); Carrell, T. W. G. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Vascular Surgery (United Kingdom); Reidy, J. F. [Guy's and St. Thomas' Foundation Hospital NHS Trust, Department of Interventional Radiology (United Kingdom)], E-mail: John.Reidy@gstt.nhs.uk

2007-09-15T23:59:59.000Z

299

Improved Criteria for the Repair of Fabrication Flaws  

SciTech Connect (OSTI)

Section III of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for nuclear power plant components requires radiographic examinations (RT) of welds and requires repairs for RT indications that exceed code acceptable sizes. This paper describes research that has generated data on welding flaws, which indicated that the largest flaws occur in repaired welds. The fabrication flaws were detected in material removed from cancelled nuclear power plants using high sensitivity Nondestructive Examination (NDE) and validated by complementary NDE and destructive testing. Evidence suggests that repairs are often for small and benign RT indications at locations buried within the vessel or pipe wall. Probabilistic fracture mechanics calculations are described in this paper to predict the increases in vessel and piping failure probabilities caused by the repair-induced flaws. Calculations address failures of embrittled vessel welds for pressurized thermal shock (PTS) transients and piping failures caused by fatigue crack growth. For vessels the small flaws, which are relatively common, can cause brittle fracture, such that the rarely encountered repair flaws of large sizes gave only modestly increased failure probabilities. Calculations for piping show that only relatively large fabrication flaws can cause failures because of the ductile nature of the piping material. The large repair flaws therefore significantly increased the failure probabilities. The paper recommends the use of more discriminating ultrasonic examinations in place of RT examinations along with repair criteria based on a fitness-for-purpose approach that minimize the number of unjustified repairs.

Doctor, Steven R.; Schuster, George J.; Simonen, Fredric A.

2004-12-01T23:59:59.000Z

300

Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

Leigh, Richard J.

2011-12-14T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Tribological Investigation of Mahua Oil Based Lubricant for Maintenance Applications  

E-Print Network [OSTI]

Limited crude reserves, consistently rising oil prices, unsafe disposal of the harmful lubricants and its guaranteed adverse aftereffects has increased concern for replenishing the environment. Development of environmental friendly lubricants and its appropriate usage is an option of prime importance which can overcome such problems. This paper investigates the prospects of Mahua oil based lubricant for maintenance applications. Mahua oil is blended with conventional gear oil (90T) in different ratios. Tribo pair used is plain carbon steel cylindrical pin and mild steel disc. Friction and wear parameters have been studied on Pin on Disc Tester under varying conditions. Worn out pins suggests pronounced abrasive and adhesive wear pattern under boundary film lubricated conditions. Experimentation reveals that addition of mahua oil blended with 90 T oil has good wear reducing traits apart from environmental benefits.

Amit Suhane; A. Rehman; H. K. Khaira

302

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

303

E-Print Network 3.0 - anaemia-dna repair connection Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Barclay Morrison and his Neurotrauma and Repair Laboratory... yet unknown, this repair process is aborted. If Morrison can find ... Source: Hone, James - Center for Electron...

304

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

of a comprehensive lifetime rating - as well as the problematic relationship between SSL lifetime and lumen maintenance - determining an appropriate LLD factor for LED products...

305

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

306

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection,...

307

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

308

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide.… (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

309

Maintenance implementation plan for the B Plant/WESF. Revision 4  

SciTech Connect (OSTI)

This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing.

Tritt, S.E.; Lueck, B.H.

1996-01-01T23:59:59.000Z

310

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

311

Preventative maintenance plan for emergency pumping trailers  

SciTech Connect (OSTI)

The purpose/goal of this document is to identify the maintenance requirements and resources available to properly maintain the readiness and condition of the Emergency Pumping Equipment controlled by the Tank Waste Remediation System Tank Farms Plant Engineering and Tank Stabilization Operations. This equipment is intended to pump a single-shell tank (SST) that has been identified as an assumed leaking tank. The goal is to commence pumping (submersible or jet) as soon as safely possible after identifying a SST as an assumed leaking tank. Important information pertaining to the Emergency Pumping Equipment, Over-Ground Piping installation, and procedures is found in WHC-SD-WM-AP-005, ``Single Shell Tank Leak Emergency Pumping Guide.``

Wiggins, D.D.

1994-09-01T23:59:59.000Z

312

Weld Repair of a Stamped Pressure Vessel in a Radiologically Controlled Zone  

SciTech Connect (OSTI)

In September 2012 an ASME B&PVC Section VIII stamped pressure vessel located at the DOE Hanford Site Effluent Treatment Facility (ETF) developed a through-wall leak. The vessel, a steam/brine heat exchanger, operated in a radiologically controlled zone (by the CH2MHill PRC or CHPRC), had been in service for approximately 17 years. The heat exchanger is part of a single train evaporator process and its failure caused the entire system to be shut down, significantly impacting facility operations. This paper describes the activities associated with failure characterization, technical decision making/planning for repair by welding, logistical challenges associated with performing work in a radiologically controlled zone, performing the repair, and administrative considerations related to ASME code requirements.

Cannell, Gary L. [Fluor Enterprises, Inc.; Huth, Ralph J. [CH2MHill Plateau Remediation Company; Hallum, Randall T. [Fluor Government Group

2013-08-26T23:59:59.000Z

313

Nondestructive evaluation and characterization of damage and repair to continuous-fiber ceramic composite panels.  

SciTech Connect (OSTI)

Continuous fiber ceramic matrix composites are currently being developed for a variety of high-temperature applications. Because of the high costs of making these components, minor damage incurred during manufacturing or operation must be rewired in order to extend the life of the components. In this study, five ceramic-grade Nicalon{trademark} fiber/SiNC-matrix composite panels were intentionally damaged with a pendulum-type impactor during an impact test. The damaged panels were then repaired at Dow Corning Corporation. Three nondestructive evaluation (NDE) methods were used to study the characteristics of the panels after the damage and again after the panels were repaired. The NDE methods were X-ray radiography, infrared thermal imaging, and air-coupled ultrasound. The results showed that the impact test induced various types of damage in the panels. The NDE data that were obtained by the three NDE methods were correlated with each other.

Sun, J. G.; Petrak, D. R.; Pillai, T. A. K.; Deemer, C.; Ellingson, W. A.

1998-04-01T23:59:59.000Z

314

The use of probabilistic risk assessment to satisfy the Nuclear Regulatory Commission`s maintenance rule  

SciTech Connect (OSTI)

Maintenance and inspection at nuclear power plants consumes a large portion of a utility`s resources, making resource allocation for such procedures vital. The NRC Maintenance Rule, due to be implemented in July of 1996, requires utilities to select systems, structures, and components (SSCS) important to safety and to develop a monitoring program to ensure that these SSCs are capable of fulfilling their intended functions. In light of these concerns, two ratios were developed to compare the risk significance of individual components with the amount of plant staff time, or burden, associated with inspecting the component. These risk/burden ratios point out existing disparities between current inspection practices and safety concerns. These ratios can be used to develop new inspection schedules constituting a more equitable risk to burden distribution.

Dubord, R.M. [Massachusetts Inst. of Tech., Cambridge, MA (United States). Dept. of Nuclear Engineering

1993-05-01T23:59:59.000Z

315

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect (OSTI)

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

316

Remote Welding, NDE and Repair of DOE Standardized Canisters  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) created the National Spent Nuclear Fuel Program (NSNFP) to manage DOE’s spent nuclear fuel (SNF). One of the NSNFP’s tasks is to prepare spent nuclear fuel for storage, transportation, and disposal at the national repository. As part of this effort, the NSNFP developed a standardized canister for interim storage and transportation of SNF. These canisters will be built and sealed to American Society of Mechanical Engineers (ASME) Section III, Division 3 requirements. Packaging SNF usually is a three-step process: canister loading, closure welding, and closure weld verification. After loading SNF into the canisters, the canisters must be seal welded and the welds verified using a combination of visual, surface eddy current, and ultrasonic inspection or examination techniques. If unacceptable defects in the weld are detected, the defective sections of weld must be removed, re-welded, and re-inspected. Due to the high contamination and/or radiation fields involved with this process, all of these functions must be performed remotely in a hot cell. The prototype apparatus to perform these functions is a floor-mounted carousel that encircles the loaded canister; three stations perform the functions of welding, inspecting, and repairing the seal welds. A welding operator monitors and controls these functions remotely via a workstation located outside the hot cell. The discussion describes the hardware and software that have been developed and the results of testing that has been done to date.

Eric Larsen; Art Watkins; Timothy R. McJunkin; Dave Pace; Rodney Bitsoi

2006-05-01T23:59:59.000Z

317

Improving central heating plant performance at the defense construction supply center (DCSC): Advanced operation and maintenance methods. Final report  

SciTech Connect (OSTI)

A 1987 air pollution emissions test done by the U.S. Army Environmental Hygiene Agency (USAEHA) identified several problems with the central heating plant (CHP) at the Defense Construction Supply Center (DCSC), Columbus, OH. Though DCSC repaired the specified problems, improved coal specifications, and tried to reduce air infiltration, CHP performance remained at unacceptable levels. Consequently, DCSC contracted the U.S. Army Construction Engineering Research Laboratories (USACERL) to apply advanced operation and maintenance procedures to improve its combustion system. This study employed a system-wide approach to evaluate the CHP 5 fuel storage, combustion, heat distribution, and the control of air emissions. Many short-term improvements to the CHP were identified and tested. Subsequent combustion and air emissions tests revealed that the recommended improvements successfully increased CHP efficiency. Long-term improvements were also recommended to help maintain the short-term improvements.

Savoie, M.J.; Standerfer, J.; Schmidt, C.M.; Gostich, J.; Mignacca, J.

1994-11-01T23:59:59.000Z

318

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

319

Turbulence-Turbine Interaction: The Basis for the Development of the TurbSim Stochastic Simulator  

SciTech Connect (OSTI)

A combination of taller wind turbines with more flexible rotors and towers operating in turbulent conditions that are not well understood is contributing to much higher than anticipated maintenance and repairs costs and is associated with lower energy production. This report documents evidence of this and offers the turbine designers an expanded tool that resolves many of these shortcomings.

Kelley, N. D.

2011-11-01T23:59:59.000Z

320

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - SPR Emergency Pipeline Repair, 2013-2017 NEPA...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion to be applied: B5.4 Repair or replacement of sections of a crude oil, produced water, brine or geothermal pipeline, if the actions are determined by the Army...

322

Incremental temporal reasoning in job shop scheduling repair  

E-Print Network [OSTI]

A working predictive schedule can be useless because of the various external or internal disruptions in a job shop. Total rescheduling may cause problems such as shop floor nervousness. Thus, the job shop scheduling repair ...

Huang, Y.

323

A tissue engineering strategy for integrative cartilage repair  

E-Print Network [OSTI]

Tissue engineering for cartilage repair is a promising approach for improving the healing of articular defects, as biomaterials and growth factors can be supplied directly to a focal lesion. However, integrating neo-tissue ...

Mroszczyk, Keri A

2014-01-01T23:59:59.000Z

324

Coherent testing and simulation of composite blade repair  

E-Print Network [OSTI]

COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1997 Major Subject: Mechanical Engineering COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to Texas A&M University In partial fulfillment of the requirements for the degree of MASTER...

McNichols, Brian Glenn

2012-06-07T23:59:59.000Z

325

Plant maintenance and advanced reactors issue, 2008  

SciTech Connect (OSTI)

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

Agnihotri, Newal (ed.)

2009-09-15T23:59:59.000Z

326

Maintenance implementation plan for B Plant  

SciTech Connect (OSTI)

The B Plant facility, is located in the 200 East Area at the Hanford Site in south-central Washington State. It consists of two major operating areas: the B Plant Canyon Building, and the Waste Encapsulation and Storage Facility (WESF). The B Plant was originally designed to chemically process spent nuclear fuels. After this initial mission was completed, the plant was modified to provide for the separation of strontium and cesium, individually, from the fission productwaste stream following plutonium and uranium recovery from irradiated reactor fuels in the Plutonium-Uranium Extraction Plant (PUREX). The recovered, purified, and concentrated strontium and cesium solutions were then transferred to the WESF for conversion to solid compounds, encapsulation, and interim storage. After strontium and cesium removal, the remaining waste was transferred from B Plant to tank farms. B Plantis an operating facility that is required to ensure safe storage And management of the WESF cesium and strontium capsules, as well as a substantial radiological inventory remaining in the plant from previous campaigns. There are currently no production activities at B Plant, but several operating systems are required to accomplish the current B Plant mission.B Plant receives and stores various chemicals from commercial suppliers for treatment of low-level waste generated at WESF and B Plant, generation of demineralized water, and conditioning of water used in heating, ventilation, and air conditioning units. This report describes the maintenance of B Plant, including personnel training and schedules.

Tritt, S.E.

1992-06-01T23:59:59.000Z

327

Development  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density,TiO2(110). |Gas-phaseDeveloping a

328

Development  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density,TiO2(110). |Gas-phaseDeveloping amagnetic

329

Predictive Maintenance Programs (PMP’s) in Small HVAC Applications: Analysis of Available Products and Technology  

E-Print Network [OSTI]

predictive maintenance software program developed by computer programmer Jim White and service technician Jeff Jones both of Portland, Oregon combines the speed of computers with digital multimeters and temperature probes to predict air conditioning... & Refrigeration News. August 16, 1993. p. 14 3 Jones, J. Western Engineers, Portland, Oregon. Personal communication. 25 February 1994. 4 Anderson, M. Boise Cascade Vibration Analysis Division, Vancouver Washington. Personal communication. 24 March 1994 5...

Watt, J. B.

1994-01-01T23:59:59.000Z

330

Data collection, storage and integration requirements torealistically assess State road maintenance needs  

E-Print Network [OSTI]

Management Information System (MMIS), Salary and Labor Distribution System (SLD), Equipment Operating System (EOS), and Material Supply Management System (MSMS). The Single Entry Screen System (SES) was developed to allow input of data related to a... databases. These databases can be grouped according to their functions into: Maintenance Related Databases (MMS, SLD, EOS, MSMS) Pavement Related Databases (TRM, RIS, RIA, PMIS, RLSE) Bridge Related Databases (BRINSAP) 10 Construction related databases...

Prodhuturi, Venkat R.

1997-01-01T23:59:59.000Z

331

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling  

E-Print Network [OSTI]

An Integrated ACO Approach for the Joint Production and Preventive Maintenance Scheduling Problem, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem very effective solutions for this problem. Key words-- ACO, Production, Preventive maintenance

Paris-Sud XI, Université de

332

Predictive maintenance policy for a gradually deteriorating system subject to stress  

E-Print Network [OSTI]

of optimal maintenance strategies for improving system availability, preventing Preprint submitted and preventive. Preventive maintenance itself can be categorized into two classes: systematic preventive preventive maintenance policies based on the a priori statistical knowledge of the system lifetime [3]. CBM

Paris-Sud XI, Université de

333

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using a Simulation-Based Approximate  

E-Print Network [OSTI]

Optimization of Preventive Maintenance Scheduling in Semiconductor Manufacturing Models Using Dynamic Programming (ADP) approach for the optimization of Preventive Maintenance (PM) scheduling schedules. I. INTRODUCTION In semiconductor manufacturing systems, or fabs, pre- ventive maintenance (PM

Fernandez, Emmanuel

334

CBM processes are applicable to maintenance activities on complex systems. Southwest Research Institute  

E-Print Network [OSTI]

performance costs, and preventive/ scheduled maintenance replaces parts before the end of their useful life optimizes costs between preventive and corrective maintenance. Preventive Condition Number of FailuresCBM processes are applicable to maintenance activities on complex systems. Southwest Research

Chapman, Clark R.

335

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin Group, Davis, CA, USA 4 Southern California Edison, Irwindale, CA, USA ABSTRACT HVAC maintenance utilities across the nation to include HVAC maintenance measures in energy efficiency programs

California at Davis, University of

336

If your codes run much slower than before the maintenance on...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

codes run much slower after the maintenance on 62514 If your codes hang or run much slower after the maintenance on 62514 June 27, 2014 (0 Comments) During the maintenance on...

337

Developing a Motor Management Policy at BASF  

E-Print Network [OSTI]

In early 1998 Thomas R. Theising, BASF Corporate Engineering initiated the formation of a motor management team. The goal of the team was to develop a Motor Management Guideline to better manage the purchase and repair of motors used throughout...

Zickefoose, B.; Theising, T. R.

338

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computer Technologies and Information Sciences 51 Proposed Program: Reliability-Centered Maintenance (RCM) for the High Flux Isotope Reactor Summary: -Centered Maintenance...

339

E-Print Network 3.0 - anti-psychotic maintenance medication Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Software... Safety and Security Neural networks IVARA www.ivara.com Reliability centered maintenance solutions... maintenance solutions RCM toolkit (report generation)...

340

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

E-Print Network 3.0 - aircraft maintenance Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the U.S. Army Logistics Air Fleet Summary: capacity, airfield landing capability, maximum flight range of aircraft, maintenance requirement... mandated maintenance...

342

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

WCRR Monthly Diesel Generator PM, dated 04082011 WI 06.01 Attachment A, JRF-11-06 Preventive Maintenance Cancellation, dated 4122011 WI 06.01 Attachment A, JRF-11-09...

343

FEMP Offers New Training on Photovoltaic Operations and Maintenance...  

Broader source: Energy.gov (indexed) [DOE]

The seminar will cover operations and maintenance (O&M) best practices for photovoltaic (PV) systems of 100 kW or less, including planning for a PV O&M scope of work and...

344

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

345

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

346

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

347

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

348

Gas Turbine Technology, Part B: Components, Operations and Maintenance  

E-Print Network [OSTI]

This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

Meher-Homji, C. B.; Focke, A. B.

349

Monitoring systems for predictive maintenance of steam turbines  

SciTech Connect (OSTI)

This paper describes two PC based computer systems that have been developed, constructed and installed in a power plant for predictive maintenance. The first system, called SIMPER, is operating on-line, collecting operational parameters such as: vibration, rotor thermal stresses, efficiency, pressures, temperatures and water level in the boiler drum from four 300 MW units. SIMPER is embedded in a network of eight nodes under the QNX operating system, and the data acquisition system has sixty four input channels. SICAD, the second system, is a dedicated computerized vibration acquisition and analysis system. The system is embedded in a 386 personal computer, and has eight input channels; each channel has its own programmable digital tracking filter. SICAD can record the vibration waveform, and the synchronous or subsynchronous vectors; the graphic interface displays in real time the polar diagram, the spectrum and waveform of the vibration signature that is being collected. SICAD can be used for balancing a multi rotor system applying the modal balancing concept.

Santiago, A.A.; Poujol-Galvan, F.C.; Kubiak, J.A.; Rivera-Grijalva, J.J.; Lopez, P.J. [Inst. de Investigaciones Electricas, Cuernavaca (Mexico)

1994-12-31T23:59:59.000Z

350

Maintenance Implementation Plan for B Plant. Revision 1  

SciTech Connect (OSTI)

The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

Tritt, S.E.

1993-04-01T23:59:59.000Z

351

Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.  

SciTech Connect (OSTI)

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

2009-09-01T23:59:59.000Z

352

Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance  

SciTech Connect (OSTI)

As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at great cost over years of trial and error. The pivotal role of expert opinion via experienced users/problem owners/maintenance engineers in all phases of the method and its application was noted and will be explored in subsequent efforts. The results are displayed via economic alternatives to more easily attract the attention of Maintenance Managers. Graphical overviews of the data demonstrated that substantial insight can be gained by simply organizing the data into statistically meaningful arrays such as histograms. The conclusions highlight several very positive avenues to evaluate at this particular juncture in time. (author)

Doyle, E. Kevin [Bruce Power LP, Box 4000B12, Tiverton, Ont., N0G2T0 (Canada)

2002-07-01T23:59:59.000Z

353

An internal seal for repairing natural gas mains  

E-Print Network [OSTI]

Joint leakage from low pressure natural gas distribution mains (typical value: 0.25 ft[superscript 3] at 6 inwg gas pressure) is a persistent source of maintenance problems for utitlites. External encapsulation is the usual ...

Cooper, Samuel A.

1984-01-01T23:59:59.000Z

354

November 21, 2007 Page 1 MAINTENANCE PROCEDURES FOR FUME HOODS  

E-Print Network [OSTI]

and no radioactive contamination is present. o Do NOT work in areas or on equipment that is posted with Radioactive exhaust components are potentially contaminated with chemical residue. If potential contamination proceeding. Radioactive Material Hoods o If a radioactive materials use hood is being repaired

Manning, Sturt

355

State Geological Survey Contributions to NGDS Data Development...  

Open Energy Info (EERE)

Contributions to NGDS Data Development, Collection and Maintenance Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title State Geological...

356

proceSS technology College of Rural and Community Development  

E-Print Network [OSTI]

, power generation, utilities, wastewater treatment facili- ties maintenance, and food processingproceSS technology College of Rural and Community Development Community and Technical College 907

Hartman, Chris

357

The Impact of Individual In Vivo Repair of DNA Double-Strand Breaks on Oral Mucositis in Adjuvant Radiotherapy of Head-and-Neck Cancer  

SciTech Connect (OSTI)

Purpose: To evaluate the impact of individual in vivo DNA double-strand break (DSB) repair capacity on the incidence of severe oral mucositis in patients with head-and-neck cancer undergoing adjuvant radiotherapy (RT) or radiochemotherapy (RCT). Patients and Methods: Thirty-one patients with resected head-and-neck cancer undergoing adjuvant RT or RCT were examined. Patients underwent RT of the primary tumor site and locoregional lymph nodes with a total dose of 60-66 Gy (single dose 2 Gy, five fractions per week). Chemotherapy consisted of two cycles of cisplatin and 5-fluorouracil. To assess DSB repair, {gamma}-H2AX foci in blood lymphocytes were quantified before and 0.5 h, 2.5 h, 5 h, and 24 h after in vivo radiation exposure (the first fraction of RT). World Health Organization scores for oral mucositis were documented weekly and correlated with DSB repair. Results: Sixteen patients received RT alone; 15 patients received RCT. In patients who developed Grade {>=} 3 mucositis (n = 18) the amount of unrepaired DSBs 24 h after radiation exposure and DSB repair half-times did not differ significantly from patients with Grade {<=}2 mucositis (n = 13). Patients with a proportion of unrepaired DSBs after 24 h higher than the mean value + one standard deviation had an increased incidence of severe oral mucositis. Conclusions: Evaluation of in vivo DSB repair by determination of {gamma}-H2AX foci loss is feasible in clinical practice and allows identification of patients with impaired DSB repair. The incidence of oral mucositis is not closely correlated with DSB repair under the evaluated conditions.

Fleckenstein, Jochen, E-mail: rajfle@uks.eu [Department of Radiotherapy and Radiation Oncology, Saarland University Medical School, Homburg (Germany); Kuehne, Martin; Seegmueller, Katharina; Derschang, Sarah; Melchior, Patrick [Department of Radiotherapy and Radiation Oncology, Saarland University Medical School, Homburg (Germany); Graeber, Stefan [Institute for Medical Biometry, Epidemiology und Medical Informatics (IMBEI), Saarland University Medical School, Homburg (Germany); Fricke, Andreas; Ruebe, Claudia E.; Ruebe, Christian [Department of Radiotherapy and Radiation Oncology, Saarland University Medical School, Homburg (Germany)

2011-12-01T23:59:59.000Z

358

Single-machine scheduling with periodic and exible periodic maintenance to minimize maximum tardiness  

E-Print Network [OSTI]

periods often appear in industry due to a machine breakdown (stochastic) or preventive maintenance of machine unavailability. However, in some cases (e.g. preventive maintenance), the maintenance of a machineSingle-machine scheduling with periodic and exible periodic maintenance to minimize maximum

Paris-Sud XI, Université de

359

DYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni  

E-Print Network [OSTI]

. There are mainly two types of maintenance activities: the preventive maintenance, whose activities can be long termDYNAMIC AND MULTI-CRITERIA SCHEDULING OF MAINTENANCE ACTIVITIES F. Marmier, C. Varnier, N Zerhouni good performance with production means. Especially in maintenance services field where the different

Paris-Sud XI, Université de

360

Analysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H.  

E-Print Network [OSTI]

maintenance interval , and the critical failure rate given that no preventive maintenance is performed (asAnalysis of OREDA Data for Maintenance Optimisation Langseth, H., Haugen, K., Sandtorv, H. SINTEF". The suggested modelling provides means to predict how maintenance tasks will affect the rate of critical

Langseth, Helge

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Designing an on-line multimedia maintenance manual for a production environment  

E-Print Network [OSTI]

). It is a combination of design-out maintenance (DOM) and preventive maintenance. The focus of DOM is to improve36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

Brinkman, Willem-Paul

362

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b,  

E-Print Network [OSTI]

Anomaly detection in monitoring sensor data for preventive maintenance Julien Rabatel a,b, , Sandra Preventive maintenance a b s t r a c t Today, many industrial companies must face problems raised to make predictive maintenance to prevent a serious breakdown. In addition, the corrective maintenance

Paris-Sud XI, Université de

363

EXPENDITURE OBJECT CODES Alphabetical Listing Expenditure Object Codes In Alphabetical Order  

E-Print Network [OSTI]

.................................................................................................................................7620 Automotive repairs, minor & maintenance, not on service contract

Harms, Kyle E.

364

Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.  

SciTech Connect (OSTI)

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

Peters, Valerie A.; Ogilvie, Alistair B.

2012-01-01T23:59:59.000Z

365

DOE handbook: Guide to good practices for training and qualification of maintenance personnel  

SciTech Connect (OSTI)

The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

NONE

1996-03-01T23:59:59.000Z

366

Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B  

SciTech Connect (OSTI)

The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

KELLY, D.J.

2000-10-09T23:59:59.000Z

367

FAQS Qualification Card – Facility Maintenance Management  

Broader source: Energy.gov [DOE]

A key element for the Department’s Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA).

368

DNA Repair 8 (2009) 803812 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

reduced gap repair and loss of the checkpoint response to low-dose irradiation. These findings shed light. Loss of the FHA domain resulted in hypersensitivity to ionizing radiation and defects in gap repair time for repair pro- cesses to act. A given DNA damage response protein may be involved Corresponding

Sekelsky, Jeff

369

Workshop Proceedings: Life Assessment and Repair of Steam Turbine Casings  

SciTech Connect (OSTI)

With the trend toward operating steam turbines far beyond their design lives, utilities need methods for assessing and extending the lives of the turbine casings. Consolidating and publishing industry experience on this subject will help utilities make run/replace decisions, select appropriate repair techniques, implement operational changes, and select new designs to meet future needs.

None

1986-07-01T23:59:59.000Z

370

Corrosion Repair and Corrosion Protection of Reinforced Concrete Structures in  

E-Print Network [OSTI]

11/14/2014 1 Corrosion Repair and Corrosion Protection of Reinforced Concrete Structures in Pulp and Paper Mills Vector Construction / Vector Corrosion Technologies www.vectorgroup.com www.vector-corrosion.com Presentation Outline · Introduction · Corrosion of Reinforced Concrete Structures · Protection of Chests

Das, Suman

371

Thermosetting Polymer-Matrix Composites for Strucutral Repair Applications  

SciTech Connect (OSTI)

Several classes of thermosetting polymer matrix composites were evaluated for use in structural repair applications. Initial work involved the characterization and evaluation of woven carbon fiber/epoxy matrix composites for structural pipeline repair. Cyanate ester resins were evaluated as a replacement for epoxy in composites for high-temperature pipe repair applications, and as the basis for adhesives for resin infusion repair of high-temperature composite materials. Carbon fiber/cyanate ester matrix composites and fumed silica/cyanate ester nanocomposites were evaluated for their thermal, mechanical, viscoelastic, and rheological properties as they relate to their structure, chemistry, and processing characteristics. The bisphenol E cyanate ester under investigation possesses a high glass transition temperature, excellent mechanical properties, and unique ambient temperature processability. The incorporate of fumed silica served to enhance the mechanical and rheological properties of the polymer and reduce thermal expansion without sacrificing glass transition or drastically altering curing kinetics. Characterization of the composites included dynamic mechanical analysis, thermomechanical analysis, differential scanning calorimetry, thermogravimetric analysis, rheological and rheokinetic evaluation, and transmission electron microscopy.

William Kirby Goertzen

2007-12-01T23:59:59.000Z

372

USDA Grants to Help Repair Housing in Rural Areas  

Broader source: Energy.gov [DOE]

The U.S. Department of Agriculture (USDA) is accepting applications for the Housing Preservation Grant program, which provides funding to repair low-income housing, rental properties, or co-op owned housing. Eligible sponsors include state agencies, local government, Tribes, and nonprofits.

373

HOW TO REPAIR A SECOND-ORDER SURFACE FOR COMPUTER  

E-Print Network [OSTI]

1 HOW TO REPAIR A SECOND-ORDER SURFACE FOR COMPUTER EXPERIMENTS BY KRIGING Astrid JOURDAN and analysis of computer experiments have been widely investigated in the past decade. Two approaches seem describes and compares them briefly in order to present a methodology for computer experiments based

Paris-Sud XI, Université de

374

Breakthrough Technologies In Vivo Observation of Cavitation and Embolism Repair  

E-Print Network [OSTI]

Breakthrough Technologies In Vivo Observation of Cavitation and Embolism Repair Using Magnetic that approximately 10 vessels had cavitated during this time. Leaf water potentials decreased from 1.25 to 2.1 MPa cavitation. Refilling of xylem vessels occurred as soon as the lights were switched off, with the majority

Holbrook, N. Michele

375

Complications of Endovascular Repair of Abdominal Aortic Aneurysms: A Review  

SciTech Connect (OSTI)

The endovascular procedure for repair of abdominal aortic aneurysms has had an enormous impact on the treatment of this challenging disease. Complications, however, do occur and it is important to have a thorough understanding of the array of complications and appropriate management strategies. In this review of endovascular complications, we describe early and late complications paying particular attention to preventive, treatment and surveillance strategies.

Katzen, Barry T. [Baptist Cardiac and Vascular Institute, Baptist Health Systems, Department of Interventional Radiology, Florida (United States)], E-mail: barryk@baptisthealth.net; MacLean, Alexandra A. [New York Hospital-Queens, Department of Surgery (United States)

2006-12-15T23:59:59.000Z

376

This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance of buildings on our  

E-Print Network [OSTI]

1 This construction, refurbishment and maintenance guide identifies the main sustainability factors that need to be considered during the design, refurbishment, construction or ongoing maintenance or manage the refurbishment, construction or ongoing maintenance of buildings on behalf of the College. We

Sheldon, Nathan D.

377

Development Development  

E-Print Network [OSTI]

Programme 2007 - 2010 The aim of the Timber Development Programme (TDP) is "to contribute to the sustainable development to underpin sustainable forest management and support economic growth and employment acrossDevelopment Timber Development Programme 2007 - 2010 #12;2 | Timber Development Programme 2007

378

Installation, Operation, and Maintenance Strategies to Reduce the Cost of Offshore Wind Energy  

SciTech Connect (OSTI)

Currently, installation, operation, and maintenance (IO&M) costs contribute approximately 30% to the LCOE of offshore wind plants. To reduce LCOE while ensuring safety, this paper identifies principal cost drivers associated with IO&M and quantifies their impacts on LCOE. The paper identifies technology improvement opportunities and provides a basis for evaluating innovative engineering and scientific concepts developed subsequently to the study. Through the completion of a case study, an optimum IO&M strategy for a hypothetical offshore wind project is identified.

Maples, B.; Saur, G.; Hand, M.; van de Pieterman, R.; Obdam, T.

2013-07-01T23:59:59.000Z

379

Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry  

SciTech Connect (OSTI)

This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

2012-09-01T23:59:59.000Z

380

Distributed Construction and Maintenance of Bandwidth and Energy Efficient  

E-Print Network [OSTI]

wireless RF technology designed initially for cable replacement at indoor places, but also supports usageDistributed Construction and Maintenance of Bandwidth and Energy Efficient Bluetooth Scatternets on simulations, the paper also presents the improvements in bandwidth-efficiency and reduction in energy

Korpeoglu, Ibrahim

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

382

CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

383

Joint Traffic Blocking and Routing under Network Failures and Maintenances  

E-Print Network [OSTI]

Joint Traffic Blocking and Routing under Network Failures and Maintenances Chao Liang ECE Dept paths. Therefore, it is important to design ingress traffic blocking and routing jointly to achieve a good balance between the two factors. Working towards this goal, we formulate a joint ingress blocking

Liu, Yong

384

CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

385

Enhancing Building Performance Through More Responsive Maintenance System  

E-Print Network [OSTI]

forth). For example, installing a water heater needs a plumber and electrician to complete the job in a traditional maintenance system. With MST principle, this work order can be done by one technician instead of two. In this way work orders...

Alsudairi, A. A.

2012-01-01T23:59:59.000Z

386

The Facility The Propellants North Administrative and Maintenance  

E-Print Network [OSTI]

and Maintenance Facility Inside Propellants North is window glazing and framing from the iconic firing rooms with energy recovery technology · Highly insulated roof and walls · Lighting fixtures with smart lighting glazing and framing · Reclaimed and processed waste concrete from Kennedy's demolition projects

387

Constraint processing for optimal maintenance Daniel Frost and Rina Dechter  

E-Print Network [OSTI]

preventative maintenance of power generating units within a power plant. We show how these problems can be cast competitive CSP algorithms on the main- tenance scheduling benchmark. The authors thank the Electric Power of a CSP : : : : : : : : : : : : : : : : : : : : : : : : : : : 7 2.3 CSP Algorithms

Dechter, Rina

388

Periodic NDE for Bridge Maintenance Ralf W. Arndt  

E-Print Network [OSTI]

Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

Huston, Dryver R.

389

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

390

REST Web Service Maintenance Through API Policy Enforcement  

E-Print Network [OSTI]

1 REST Web Service Maintenance Through API Policy Enforcement Hiranya Jayathilaka, Chandra Krintz 100% annual growth rate [2]. These APIs increasingly employ the REST (Representational State Transfer accessible to users via web application programming interfaces (web APIs) and cloud-based deployment

California at Santa Barbara, University of

391

Model 6000 Laser Controller Operation and Maintenance Manual  

E-Print Network [OSTI]

i Model 6000 Laser Controller Operation and Maintenance Manual #12;Corporate Headquarters Canada by improper use or failure to observe proper operating procedures per the product specification or operators 9002 by the British Standards Institution. #12;Limited Warranty Newport warrants that this product

392

ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS  

E-Print Network [OSTI]

ARIES-CS MAINTENANCE SYSTEM DEFINITION AND ANALYSIS LESTER M. WAGANER* and RICHARD J. PEIPERT, Jr in the electronic version. I. INTRODUCTION The ARIES studies, sponsored by the U.S. Depart- ment of Energy and led how the physics and coil definition determine and influence the power core elements. Especially

393

Combined Haploinsufficiency for ATM and RAD9 as a Factor in Cell Transformation, Apoptosis, and DNA Lesion Repair Dynamics  

E-Print Network [OSTI]

Lesion Repair Dynamics Lubomir B. Smilenov, Howard B. Lieberman, Stephen A. Mitchell, Ronald A. Baker

394

Dofasco`s No. 4 blast furnace hearth breakout, repair and rescue  

SciTech Connect (OSTI)

On May 5, 1994, after producing 9.5 million metric tons of iron, Dofasco`s No. 4 Blast Furnace experienced a hearth breakout 250 millimeters below the west taphole. The hot metal spill caused a fire resulting in severe damage and 33 days of lost production. During a 26-day period, electrical wiring, water drainage systems and both tapholes were repaired. Recovery from an unprepared furnace stop of this length, with the deadman depleted is difficult. To aid with the rescue Hoogovens-designed oxygen/fuel lances were commissioned. The furnace recovery began with a lance in each taphole and all tuyeres plugged. Six days after startup the furnace was casting into torpedo cars, and after nine days operation had returned to normal. This incident prompted Dofasco to expand the hearth monitoring system to detect and prevent similar occurrences. During the repair, 203 new thermocouples were installed in the hearth, concentrating on the tapholes and elephant foot areas. These thermocouples were installed at various depths and locations to allow heat flux calculations. This hearth monitoring system has already identified other problem areas and provided valuable information about hearth drainage patterns. This information has allowed them to develop control strategies to manage localized problem areas.

Donaldson, R.J.; Fischer, A.J.; Sharp, R.M.; Stothart, D.W. [Dofasco Inc., Hamilton, Ontario (Canada)

1995-12-01T23:59:59.000Z

395

The French design code: RCC-M status and on-going developments  

SciTech Connect (OSTI)

Since 1978, an important effort has been on-going between Framatome and Electricite de France (EDF) to develop and update technical rules for the design and construction of nuclear power plants. Two design codes are developed, one for PWRs: RCC-M and one for FBRs: RCC-MR. After some comments on the organization of RCCM Commission, the paper presents: (1) the major differences with the ASME Section III Code for fatigue, plastic shakedown and rupture analysis; (2) the review of some important facts in terms of availability or maintenance costs (in-service inspection, replacements, repairs, etc.) of operating plants like underclad cracking, stratification, CRDM nozzles, cast elbows, steam generator tubes, etc.; (3) how can one take into consideration this operating feedback in RCC-M Code; and (4) few examples of major on-going developments for fracture analysis on different components and fatigue analysis of valves. In conclusion, the standardization of the plants is a fruitful benefit because it allow inclusion of operating feedback in the design rules, earlier in the process of new designs or replacement parts.

Faidy, C. [Electricite de France-SEPTEN, Villeurbanne (France)

1996-12-01T23:59:59.000Z

396

Biomolecular Simulation of Base Excision Repair and Protein Signaling  

SciTech Connect (OSTI)

The goal of the Biomolecular Simulation of Base Excision Repair and Protein Signaling project is to enhance our understanding of the mechanism of human polymerase-?, one of the key enzymes in base excision repair (BER) and the cell-signaling enzymes cyclic-AMP-dependent protein kinase. This work used molecular modeling and simulation studies to specifically focus on the • dynamics of DNA and damaged DNA • dynamics and energetics of base flipping in DNA • mechanism and fidelity of nucleotide insertion by BER enzyme human polymerase-? • mechanism and inhibitor design for cyclic-AMP-dependent protein kinase. Molecular dynamics simulations and electronic structure calculations have been performed using the computer resources at the Molecular Science Computing Facility at the Environmental Molecular Sciences Laboratory.

Straatsma, TP; McCammon, J. A.; Miller, John H.; Smith, Paul E.; Vorpagel, Erich R.; Wong, Chung F.; Zacharias, Martin W.

2006-03-03T23:59:59.000Z

397

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

398

Data quality assurance and performance measurement of data mining for preventive maintenance of power grid  

E-Print Network [OSTI]

Ensuring reliability as the electrical grid morphs into the "smart grid" will require innovations in how we assess the state of the grid, for the purpose of proactive maintenance, rather than reactive maintenance; in the ...

Wu, Leon

2011-01-01T23:59:59.000Z

399

Project Profile: Maintenance-Free Stirling Engine for High-Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

400

Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation MaintenanceTransportation Maintenancepp  

E-Print Network [OSTI]

Innovative Contracting Strategies forInnovative Contracting Strategies for TransportationResearch Methodology Research Findings and DeliverablesResearch Findings and Deliverables Maintenance Contracting Strategy Selection Framework Maintenance Contracting Strategy Selection Guide Case St dies on Inno ati e

Texas at Austin, University of

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...  

Energy Savers [EERE]

RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 -...

402

Recompile if your codes run into MPICH error after the maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recompile if your codes run into MPICH errors after the maintenance on 6252014 Recompile if your codes run into MPICH error after the maintenance on 6252014 June 27, 2014 (0...

403

Automated ground maintenance and health management for autonomous unmanned aerial vehicles  

E-Print Network [OSTI]

Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

404

Steam turbine restart temperature maintenance system and method  

SciTech Connect (OSTI)

A restart temperature maintenance system is described for a steam turbine system; the steam turbine system comprising a steam turbine, the turbine including a rotation shaft, an outer metal shell means. The restart temperature maintenance system consists of: (a) fastener means affixed to the outer surface of the shell means at predetermined positions; (b) air gap spacer means affixed to the outer surface of the shell means, the air gap spacer means substantially covering the shell means; (c) a plurality of electric heating blanket means of predetermined size and shape positioned in insulative relationship over the air gap spacer means and the heating blanket means maintained in predetermined position by the fastener means; (d) heat sensor means affixed to the outer metal shell means of the steam turbine in predetermined position; (e) power supply means for supplying power to the heating blanket means; (f) heat sensor monitor and controller means connected in circuit between the power supply means and the heat sensor means.

McClelland, T.R.

1986-04-29T23:59:59.000Z

405

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated  

E-Print Network [OSTI]

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem study on joint production and preventive maintenance scheduling strategies regarding flowshop problems, Preventive maintenance, Joint scheduling, GA, Taboo search, NEH heuristic, Flowshop. 1. Introduction

Boyer, Edmond

406

SCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL  

E-Print Network [OSTI]

philosophies have therefore evolved towards the preventive condition-based maintenance [3,4]. This conceptSCHEDULED AND SHM STRUCTURALAIRFRAME MAINTENANCE APPLICATIONS USING A NEW PROBABILISTIC MODEL LĂ©a D.cot@insa-toulouse.fr ABSTRACT This paper focuses on aircraft structure maintenance. A general mathematical framework based

Boyer, Edmond

407

`ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY  

E-Print Network [OSTI]

1 `ODDS ALGORITHM'-BASED OPPORTUNITY-TRIGGERED PREVENTIVE MAINTENANCE WITH PRODUCTION POLICY THOMAS.monnin}@cran.uhp-nancy.fr Abstract: In the field of manufacturing, the planning of opportunistic preventive maintenance actions' (Bruss algorithm), opportunistic preventive maintenance. 1. INTRODUCTION With today's growing demand

Paris-Sud XI, Université de

408

Optimizing with constraints: a case study in scheduling maintenance of electric power units  

E-Print Network [OSTI]

industry is that of optimally schedul­ ing preventative maintenance of power generating units within of the electric power industry: optimally scheduling preventative maintenance of power generating units within or two dozen power generating units which can be individually scheduled for preventive maintenance. Both

Dechter, Rina

409

GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE  

E-Print Network [OSTI]

GENERATION D'INDICATEURS DANS LE CADRE D'UNE POLITIQUE DE MAINTENANCE PREVENTIVE CONDITIONNELLE Indicators generation as part of a policy of conditional preventive maintenance Pascal VRIGNAT, Manuel AVILA DE MAINTENANCE PREVENTIVE CONDITIONNELLE, Tours : France (2012)" #12;- le système se dégrade

Paris-Sud XI, Université de

410

Methodology for assessing system performance loss within a proactive maintenance framework  

E-Print Network [OSTI]

role, the practices are required to move from corrective maintenance to preventive and even proactiveMethodology for assessing system performance loss within a proactive maintenance framework P,alexandre.voisin,eric.levrat,benoit.iung}@cran.uhp-nancy.fr) Abstract: Maintenance plays now a critical role

Boyer, Edmond

411

Mathematical optimization of a flexible job shop problem including preventive maintenance and  

E-Print Network [OSTI]

1 Mathematical optimization of a flexible job shop problem including preventive maintenance as the scheduling problem includes limited availability of fixtures and preventive maintenance planning periodicity, a number of preventive maintenance activities need to be carried out in some of the resources

Patriksson, Michael

412

Scheduling predictive maintenance in flow-shop Christophe Varnier, Noureddine Zerhouni  

E-Print Network [OSTI]

. Predictive maintenance is an answer to prevent equipment from risk of breakdowns while minimizing, for each machine, the control mode and if necessary the preventive maintenance plan. I. INTRODUCTION to prevent equipment from risk of breakdowns while minimizing the maintenance costs. Nevertheless, conflicts

Boyer, Edmond

413

MTTF of a 1 out of n system with preventive maintenance Christiane CocozzaThivent  

E-Print Network [OSTI]

MTTF of a 1 out of n system with preventive maintenance Christiane Cocozza­Thivent Universit´e de. The working item is submitted to an age preventive maintenance: when this item reachs age a, it is replaced by a waiting item if there is one. If not the system fails. The duration of the preventive maintenance is equal

Cocozza-Thivent, Christiane

414

LS-SVM based regression and spectral clustering for predicting maintenance of machines  

E-Print Network [OSTI]

with sensory3 faults have been used [? ],[? ],[? ]: corrective maintenance, preventive main-4 tenance, manual the machine fails, it is expensive and6 safety and environmental issues arise. Preventive maintenance is basedLS-SVM based regression and spectral clustering for predicting maintenance of machines Rocco

415

How Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar Jurgens, Benedikt Hauptmann  

E-Print Network [OSTI]

effort can thus be expected to be low. On the other hand, however, preventive and adaptive maintenance [3. The remaining changes comprise adaptive and preventive maintenance. We thus have to expect unnecessary codeHow Much Does Unused Code Matter for Maintenance? Sebastian Eder, Maximilian Junker, Elmar J

416

Condition based maintenance model for a production deteriorating Phuc Do Van and Christophe Berenguer  

E-Print Network [OSTI]

significantly and the system might not be able to cope with demand. In many preventive maintenance policiesCondition based maintenance model for a production deteriorating system Phuc Do Van and Christophe both maintenance cost and production capacity aspects for a single unit production system whose

Boyer, Edmond

417

Optimizing with constraints: a case study in scheduling maintenance of electric power units  

E-Print Network [OSTI]

is that of optimally schedul- ing preventative maintenance of power generating units within a power plant. We show how: optimally scheduling preventative maintenance of power generating units within a power plant. We de ne can be individually scheduled for preventive maintenance. Both the required duration of each unit

Dechter, Rina

418

Optimisation par algorithme gntique de la maintenance prventive dans un contexte de modlisation par modles  

E-Print Network [OSTI]

would be to apply a preventive maintenance in order to limit or even prevent system breakdowns (failures). But if the preventive maintenance is not properly regulated, we risk to face excessive costs and unnecessary system downtime. Given this situation, we should so consider establishing preventive maintenance strategies

Boyer, Edmond

419

Advanced Maintenance Modelling StatAvaries : An original multinet decision support tool for  

E-Print Network [OSTI]

the use of the preventive maintenance strategies on the availability of the network whereas the last model and preventive maintenance actions to delays before broken rails detection and related number of missed trains (aAdvanced Maintenance Modelling 1 StatAvaries : An original multinet decision support tool

Paris-Sud XI, Université de

420

Leon County Extension -615 Paul Russell Rd. -Tallahassee Limited Commercial Landscape Maintenance Certification  

E-Print Network [OSTI]

Leon County Extension - 615 Paul Russell Rd. - Tallahassee Limited Commercial Landscape Maintenance Certification Training Class & Exam Wednesday, March 21, 2012 If you work for a commercial landscape maintenance requires that you have a limited commercial landscape maintenance certification. To take the test

Watson, Craig A.

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Low-maintenance Landscape Plants for South Florida Jody Haynes1  

E-Print Network [OSTI]

Low-maintenance Landscape Plants for South Florida Jody Haynes1 , John McLaughlin2 , Laura Vasquez3 landscape plants suitable for south Florida. The resulting list includes over 350 low-maintenance plants in the Florida Yards & Neighborhoods (FYN) program in Miami-Dade County for a list of recommended low-maintenance

Jawitz, James W.

422

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank  

E-Print Network [OSTI]

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank B. de, Helsinki Predictive maintenance for the heated hold-up tank #12;Problem Solution Results Conclusion Outline 1 Maintenance problem The heated hold-up tank Optimization problem 2 Numerical solution Mathematical

De Saporta, Benoîte

423

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network [OSTI]

., Chemical Engineering 9/1/75. 4. Maintenance Engineering, May 1976. 5. "How Much Does Lost Steam Cost",Armstrong Machine works, Hydrocarbon Processing, p.129, Jan. 1976. 6. "Setter Steam Trapping Cuts Energy Waste", wesley Yates, Yarway Corp..., Georgia Tech Industrial Energy Extension Service, Chemical Engineering, 2/11/80. 10. ''Basic Facts & Enerqv Saving Tips" ,Lawrence R. O'Dell, Armstrong Machine Works, Heating/Piping/ Air Conditioning, May 1977. 11. Steam Trap Report - Energy Loss...

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

424

ExxonMobil Olefins Plant Projects, Maintenance and Optimizations  

E-Print Network [OSTI]

are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

Neely, M. M.

2014-01-01T23:59:59.000Z

425

Community Wind Handbook/Plan for Maintenance | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to: navigation, search Name: Communityfor Maintenance <

426

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

427

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

428

Brain necrosis after fractionated radiation therapy: Is the halftime for repair longer than we thought?  

SciTech Connect (OSTI)

Purpose: To derive a radiobiological model that enables the estimation of brain necrosis and spinal cord myelopathy rates for a variety of fractionation schemes, and to compare repair effects between brain and spinal cord. Methods: Sigmoidal dose response relationships for brain radiation necrosis and spinal cord myelopathy are derived from clinical data using nonlinear regression. Three different repair models are considered and the repair halftimes are included as regression parameters. Results: For radiation necrosis, a repair halftime of 38.1 (range 6.9-76) h is found with monoexponential repair, while for spinal cord myelopathy, a repair halftime of 4.1 (range 0-8) h is found. The best-fit alpha beta ratio is 0.96 (range 0.24-1.73)Conclusions: A radiobiological model that includes repair corrections can describe the clinical data for a variety of fraction sizes, fractionation schedules, and total doses. Modeling suggests a relatively long repair halftime for brain necrosis. This study suggests that the repair halftime for late radiation effects in the brain may be longer than is currently thought. If confirmed in future studies, this may lead to a re-evaluation of radiation fractionation schedules for some CNS diseases, particularly for those diseases where fractionated stereotactic radiation therapy is used.

Bender, Edward T. [Department of Human Oncology, University of Wisconsin-Madison, School of Medicine and Public Health, 600 Highland Avenue, Madison, Wisconsin 53792 (United States)

2012-11-15T23:59:59.000Z

429

E-Print Network 3.0 - automobile repair shops Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: automobile repair shops Page: << < 1 2 3 4 5 > >> 1 Program Director: Jim Headlee Phone:...

430

E-Print Network 3.0 - activation repairs endothelial Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

aorta of the normal rabbit exhibits focal sites Summary: to repair this injury. Because fluid mechanical forces regulate such fundamental endothelial processes... PF. Shear...

431

E-Print Network 3.0 - auto body repair Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Repair Your source ... Source: Braun, Paul - Department of Materials Science and Engineering, University of Illinois at Urbana-Champaign Collection: Materials Science 3 A Case...

432

The Importance of Mosquito miRNA-275 in Blood Digestion and Egg Development  

E-Print Network [OSTI]

BOTH BLOOD DIGESTION AND EGG DEVELOPMENT. (BRYANT ET AL.maintenance. Along with Dr. Bryant, I began characterizingwas performed by Dr. Bart Bryant (Bryant et al. 2010). By

Macdonald, Warren Paul

2012-01-01T23:59:59.000Z

433

Advanced Modular Inverter Technology Development  

SciTech Connect (OSTI)

Electric and hybrid-electric vehicle systems require an inverter to convert the direct current (DC) output of the energy generation/storage system (engine, fuel cells, or batteries) to the alternating current (AC) that vehicle propulsion motors use. Vehicle support systems, such as lights and air conditioning, also use the inverter AC output. Distributed energy systems require an inverter to provide the high quality AC output that energy system customers demand. Today's inverters are expensive due to the cost of the power electronics components, and system designers must also tailor the inverter for individual applications. Thus, the benefits of mass production are not available, resulting in high initial procurement costs as well as high inverter maintenance and repair costs. Electricore, Inc. (www.electricore.org) a public good 501 (c) (3) not-for-profit advanced technology development consortium assembled a highly qualified team consisting of AeroVironment Inc. (www.aerovironment.com) and Delphi Automotive Systems LLC (Delphi), (www.delphi.com), as equal tiered technical leads, to develop an advanced, modular construction, inverter packaging technology that will offer a 30% cost reduction over conventional designs adding to the development of energy conversion technologies for crosscutting applications in the building, industry, transportation, and utility sectors. The proposed inverter allows for a reduction of weight and size of power electronics in the above-mentioned sectors and is scalable over the range of 15 to 500kW. The main objective of this program was to optimize existing AeroVironment inverter technology to improve power density, reliability and producibility as well as develop new topology to reduce line filter size. The newly developed inverter design will be used in automotive and distribution generation applications. In the first part of this program the high-density power stages were redesigned, optimized and fabricated. One of the main tasks was to design and validate new gate drive circuits to provide the capability of high temp operation. The new power stages and controls were later validated through extensive performance, durability and environmental tests. To further validate the design, two power stages and controls were integrated into a grid-tied load bank test fixture, a real application for field-testing. This fixture was designed to test motor drives with PWM output up to 50kW. In the second part of this program the new control topology based on sub-phases control and interphase transformer technology was successfully developed and validated. The main advantage of this technology is to reduce magnetic mass, loss and current ripple. This report summarizes the results of the advanced modular inverter technology development and details: (1) Power stage development and fabrication (2) Power stage validation testing (3) Grid-tied test fixture fabrication and initial testing (4) Interphase transformer technology development

Adam Szczepanek

2006-02-04T23:59:59.000Z

434

Repair welding of fusion reactor components. Final technical report  

SciTech Connect (OSTI)

The exposure of metallic materials, such as structural components of the first wall and blanket of a fusion reactor, to neutron irradiation will induce changes in both the material composition and microstructure. Along with these changes can come a corresponding deterioration in mechanical properties resulting in premature failure. It is, therefore, essential to expect that the repair and replacement of the degraded components will be necessary. Such repairs may require the joining of irradiated materials through the use of fusion welding processes. The present ITER (International Thermonuclear Experimental Reactor) conceptual design is anticipated to have about 5 km of longitudinal welds and ten thousand pipe butt welds in the blanket structure. A recent study by Buende et al. predict that a failure is most likely to occur in a weld. The study is based on data from other large structures, particularly nuclear reactors. The data used also appear to be consistent with the operating experience of the Fast Flux Test Facility (FFTF). This reactor has a fuel pin area comparable with the area of the ITER first wall and has experienced one unanticipated fuel pin failure after two years of operation. The repair of irradiated structures using fusion welding will be difficult due to the entrapped helium. Due to its extremely low solubility in metals, helium will diffuse and agglomerate to form helium bubbles after being trapped at point defects, dislocations, and grain boundaries. Welding of neutron-irradiated type 304 stainless steels has been reported with varying degree of heat-affected zone cracking (HAZ). The objectives of this study were to determine the threshold helium concentrations required to cause HAZ cracking and to investigate techniques that might be used to eliminate the HAZ cracking in welding of helium-containing materials.

Chin, B.A.; Wang, C.A.

1997-09-30T23:59:59.000Z

435

Contract and beyond GEMnet status and accomplishments: GSA's energy and maintenance network  

SciTech Connect (OSTI)

The U.S. General Services Administration Pacific Rim Region (Region 9), manages over 20 million gross square feet of federally owned office space, plus additional leased office space, for the federal government in California, Nevada, Arizona, Hawaii and the Pacific territories. To assist in this real estate management the Pacific Rim Region is developing the GSA Energy and Maintenance Network, or GEMnet. GEMnet is a collection of information technology initiatives, including remote monitoring and control to reduce operational costs by improving energy efficiency, reducing peak demand, and optimizing maintenance in buildings. Ultimately the various systems use a common database platform. This paper describes the status and plans for GEMnet, focusing on how it compares with related monitoring and information technology currently used in nonresidential buildings. This paper will also report on recent activities within the GEMnet purview, demand-shedding and retro-commissioning. For example, two large GSA office buildings in the San Francisco Bay Area participated in the California Independent System Operator (ISO) demand relief program (DRP) during the summer of 2001, shedding nearly 1 MW when called upon. In conjunction with the fielding of GEMnet related programs, a series of retro-commissioning projects is being implemented, scoped to the needs of particular buildings. Details on the BAS retro-commissioning at one building is presented.

Piette, Mary Ann; Kinney, Satkartar; Levi, Mark; McBride, David; May, Stephen

2002-05-01T23:59:59.000Z

436

Blade reliability collaborative : collection of defect, damage and repair data.  

SciTech Connect (OSTI)

The Blade Reliability Collaborative (BRC) was started by the Wind Energy Technologies Department of Sandia National Laboratories and DOE in 2010 with the goal of gaining insight into planned and unplanned O&M issues associated with wind turbine blades. A significant part of BRC is the Blade Defect, Damage and Repair Survey task, which will gather data from blade manufacturers, service companies, operators and prior studies to determine details about the largest sources of blade unreliability. This report summarizes the initial findings from this work.

Ashwill, Thomas D.; Ogilvie, Alistair B.; Paquette, Joshua A.

2013-04-01T23:59:59.000Z

437

Top Operations and Maintenance (O&M) Efficiency Opportunities at DoD/Army Sites - A Guide for O&M/Energy Managers and Practitioners  

SciTech Connect (OSTI)

This report, sponsored the Army's Energy Engineering Analysis Program, provides the Operations and Maintenance (O&M) Energy manager and practitioner with useful information about the top O&M opportunities consistently found across the DoD/Army sector. The target is to help the DoD/Army sector develop a well-structured and organized O&M program.

Sullivan, Gregory P.; Dean, Jesse D.; Dixon, Douglas R.

2007-05-25T23:59:59.000Z

438

Decommissioning and Dismantling of the Floating Maintenance Base 'Lepse' - 13316  

SciTech Connect (OSTI)

The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The Northern Dimension Environmental Partnership (NDEP) approved an internationally funded project to identify and prioritise nuclear and environmental hazards in NW Russia. Within this project the Lepse was recognised as being one of the highest nuclear hazards in NW Russia. Removal of SNF, SRW and LRW from Lepse requires innovative design and development of bespoke equipment. The main drivers of the NDEP Donors are first to safely transport Lepse in 2012 from her current berth close to the local population in Murmansk to the nominated dismantling shipyard, and secondly to raise Lepse from the water in 2013 onto the slip-way at the dismantling shipyard. A description is provided of the approach and progress towards preparing the Lepse for the removal of SFAs and other radioactive waste, to decontaminate and then dismantle the vessel under international donor funding. (authors)

Field, D.; Mizen, K. [Nuvia Limited (United Kingdom)] [Nuvia Limited (United Kingdom)

2013-07-01T23:59:59.000Z

439

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment  

SciTech Connect (OSTI)

This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

Hill, D; Scarola, K

2004-10-30T23:59:59.000Z

440

Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design  

SciTech Connect (OSTI)

A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team indicates that the proposed solutions to the investigated operating cycle length barriers are both feasible and consistent with sound design practice.

Professor Neill Todreas

2001-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

NPP operation and maintenance with French-built NPPs  

SciTech Connect (OSTI)

In France, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by Electricite de France on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EdF and Framatome, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly those of Framatome-built units.

Mira, J.J.; Charbonneau, S.

1988-01-01T23:59:59.000Z

442

Standard hydrogen monitoring system-B operation and maintenance manual  

SciTech Connect (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

Bender, R.M.

1995-01-25T23:59:59.000Z

443

Plant maintenance and plant life extension issue, 2007  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

Agnihotri, Newal (ed.)

2007-03-15T23:59:59.000Z

444

Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -Lowellfor 2013 | Jefferson Lab Maintenance

445

Two Innovative Steps for Training on Maintenance: 'VIRMAN' Spanish Project based on Virtual Reality 'STARMATE' European Project based on Augmented Reality  

SciTech Connect (OSTI)

This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up the procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual world thanks to a voice recognition system and a virtual pointing device. The maintenance work is guided with audio instructions, 2D and 3D information are directly displayed into the user's goggles: There is a position-tracking system that allows 3D virtual models to be displayed in the real counterpart positions independently of the user allocation. The user can create his own virtual environment, placing the information required wherever he wants. The STARMATE system is applicable to a large variety of real work situations. (author)

Gonzalez Anez, Francisco [Tecnatom s.a., Avda. Montes de Oca 1, 28709 San Sebastian de los Reyes, Madrid (Spain)

2002-07-01T23:59:59.000Z

446

Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast  

E-Print Network [OSTI]

Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast Ann-assisted bulk segregant analysis, we identified one other locus, MKT1, and a QTL on Chromosome VII that also) Identification and Dissection of a Complex DNA Repair Sensitivity Phenotype in Baker's Yeast. PLoS Genet 4(7): e

Kruglyak, Leonid

447

Lazy Means Smart: Reducing Repair Bandwidth Costs in Erasure-coded Distributed Storage  

E-Print Network [OSTI]

- ditional bandwidth savings. 1. INTRODUCTION Erasure coding schemes, e.g. Reed-Solomon (RS) codes on the example of Reed-Solomon codes, and then explain the repair bandwidth problem. In an RS(n,k) stor- age scheme. 4. EVALUATION METHODOLOGY Evaluating the efficacy of lazy recovery in reducing repair bandwidth

Alvisi, Lorenzo

448

A Centralized, TreeBased Approach to Network Repair Service for Multicast Streaming Media  

E-Print Network [OSTI]

transmission, and can forward (via unicast) packets to other repair servers that did not receive the packets via the original transmission. After a fixed delay on the order of several seconds, a repair server with a transmission that is delayed by a few seconds relative to the original multicast session. However, this delayed

Maxemchuk, Nicholas F.

449

4 CONCRETE REPAIR BULLETIN MAY/JUNE2001 Laser Profilometry for  

E-Print Network [OSTI]

4 CONCRETE REPAIR BULLETIN MAY/JUNE2001 Laser Profilometry for Concrete Substrate Characterization and resins are non- corrosive, they are ideally suited for the repair and retrofitting of concrete bridges highly upon the quality of the bond between the concrete and the laminate. Experience has shown that when

Maerz, Norbert H.

450

Optimizing Repair Programs for Consistent Query Answering Monica Caniupan and Leopoldo Bertossi  

E-Print Network [OSTI]

, a logic programming system that implements the stable models semantics, in particular. We also analyze be restored minimally by inserting Q(a) or elim- inating S(a). The repair program contains the following 1Optimizing Repair Programs for Consistent Query Answering Monica Caniupan and Leopoldo Bertossi

Bertossi, Leopoldo

451

Maintenance Testing of Mixed-Signal Boards: the FCB Technical Report LiSyc, UBO Brest (France), June 2005  

E-Print Network [OSTI]

a part of his work. In maintenance, one may distinguish preventive maintenance from corrective1 Maintenance Testing of Mixed-Signal Boards: the FCB case study Technical Report LiSyc, UBO Brest, Fax: +33 298 340 986 bruno.castel@isismpp.fr Keywords: Maintenance testing, mixed-signal board testing

Boyer, Edmond

452

IEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies for Wind Turbine  

E-Print Network [OSTI]

and maintenance. ACRONYMS NA no action PM preventive maintenance OB observation CM corrective maintenance OIEEE TRANSACTIONS ON RELIABILITY, VOL. 59, NO. 2, JUNE 2010 393 Optimal Maintenance Strategies decisions. Based on the information from sensors, our research objective is to derive an optimal preventive

Ding, Yu

453

Dynamic grouping maintenance strategy with time limited opportunities Phuc Do Van, Florent Brissaud, Anne Barros, Christophe Berenguer  

E-Print Network [OSTI]

. Preventive maintenance durations and occurrences of main- tenance activities within the scheduling horizon by taking into account both the preventive maintenance durations and the occur- rences of maintenance of a system is often an opportunity to com- bine preventive and corrective maintenance. This is especially

Paris-Sud XI, Université de

454

Injection repair of carbon fiber/bismaleimide composite panels with bisphenol E cyanate ester resin  

SciTech Connect (OSTI)

Resin injection of bisphenol E cyanate ester, a low viscosity resin that cures into a high temperature thermoset polymer, is investigated as a reliable repair method to restore strength and stiffness in delaminated carbon fiber/bismaleimide composites used in aircraft panels. The influence of temperature on the viscosity of the uncured resin was measured to optimize the injection conditions for high resin infiltration into the delaminations. The repair efficiency of the resin was evaluated by varying the panel thickness and the method by which the delamination damage was created in the composite specimens. Ultrasonic scanning (C-scan), flash thermography images, and cross-section analysis of repaired panels revealed excellent resin infiltration into the damaged region. Evaluation of mechanical repair efficiency using both bending stiffness and in-plain compressive strength of the composite panels as the repair metrics showed values exceeding 100%.

Thunga, Mahendra [Ames Laboratory; Bauer, Amy [Iowa State University; Obusek, Kristine [Fleet Readiness Center East; Meilunas, Ray [Naval Air Warfare Center Aircraft Division; Akinc, Mufit [Ames Laboratory; Kessler, Michael R [Ames Laboratory

2014-08-01T23:59:59.000Z

455

Repair of gamma-ray-induced DNA base damage in xeroderma pigmentosum cells  

SciTech Connect (OSTI)

The repair of DNA damage produced by /sup 137/Cs gamma irradiation was measured with a preparation from Micrococcus luteus containing DNA damage-specific endonucleases in combination with alkaline elution. The frequency of these endonuclease sensitive sites (ESS) was determined after 54 or 110 Gy of oxic irradiation in normal and xeroderma pigmentosum (XP) fibroblasts from complementation groups A, C, D, and G. Repair was rapid in all cell strains with greater than 50% repair after 1.5 h of repair incubation. At later repair times, 12-17 h, more ESS remained in XP than in normal cells. The frequency of excess ESS in XP cells was approximately 0.04 per 10(9) Da of DNA per Gy which was equivalent to 10% of the initial ESS produced. The removal of ESS was comparable in XP cells with normal radiosensitivity and XP3BR cells which have been reported to be moderately radiosensitive.

Fornace, A.J. Jr.; Dobson, P.P.; Kinsella, T.J.

1986-04-01T23:59:59.000Z

456

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

457

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

458

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect (OSTI)

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

459

Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.  

SciTech Connect (OSTI)

This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

2005-12-01T23:59:59.000Z

460

Operational experience and maintenance programs of Transamerica Delaval, Inc., diesel generators  

SciTech Connect (OSTI)

Concerns regarding the reliability of large-bore, medium-speed diesel generators manufactured by Transamerica Delaval, Inc. (TDI) for application at domestic nuclear plants were first prompted by a crankshaft failure at Shoreham Nuclear Power Station in August 1983. A number of diesel generator components were identified which had potential deficiencies from a manufacturing and operational standpoint. In response to these problems, 11 (now 8) U.S. nuclear utility owners formed a TDI Diesel Generator Owners Group (Owners Group) to address operational and regulatory issues relative to diesel generator sets used for standby emergency power. The Owners` Group performed extensive design reviews of all key engine components and developed recommendations to be implemented by the individual owners concerning needed component replacements and modifications, component inspections to validate the {open_quotes}as-manufactured{close_quotes} and {open_quotes}as-assembled{close_quotes} quality of key engine components, engine testing, and an enhanced maintenance and surveillance program.

Rajan, J.R.

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Experience in the repair of steam generator auxiliary feedwater nozzle  

SciTech Connect (OSTI)

The auxiliary feedwater nozzle is quite often subjected to more thermal stress cycles and other loading mechanisms during their service life than the material was designed and fabricated for at the nozzle of the earlier steam generators in many nuclear plants. During plant operation, the auxiliary feedwater nozzle outlet is exposed to the hot steam from the generator side, while the auxiliary feedwater piping which contains subcooled water from the inlet often induces water hammer as a result of the steam-water mixing phenomena. The thermal cycles and the steam bubble collapse at the nozzle may cause cracking in the nozzle liner and interior surface of the nozzle, and subsequently results in structural damage to the steam generator. This presentation is intended to share the lessons learned from the evaluation of the nozzle condition and the subsequent modification and repair made to the auxiliary feedwater nozzle at the Palisades Nuclear Plant. Other nuclear plant owners may benefit from this experience.

Chao, K.K.N. [Consumers Power Co., Jackson, MI (United States)

1996-12-01T23:59:59.000Z

462

Method of tissue repair using a composite material  

DOE Patents [OSTI]

A composite biocompatible hydrogel material includes a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa. A calcium comprising salt is disposed in at least some of the pores. The porous polymer matrix can comprise cellulose, including bacterial cellulose. The composite can be used as a bone graft material. A method of tissue repair within the body of animals includes the steps of providing a composite biocompatible hydrogel material including a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa, and inserting the hydrogel material into cartilage or bone tissue of an animal, wherein the hydrogel material supports cell colonization in vitro for autologous cell seeding.

Hutchens, Stacy A; Woodward, Jonathan; Evans, Barbara R; O'Neill, Hugh M

2014-03-18T23:59:59.000Z

463

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan  

E-Print Network [OSTI]

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan Mobile & Internet Systems Laboratory (MISL), University College Cork, Ireland Email: {a.barroso, u

Roedig, Utz

464

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan  

E-Print Network [OSTI]

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan Mobile & Internet Systems Laboratory, University College Cork, Ireland Email: {a.barroso u

Sreenan, Cormac J.

465

Chapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Chapter 51, entitled Attainment and Maintenance of the National Ambient Air Quality Standards, is promulgated under the authority of the Division of Air Quality...

466

DOE Order Self Study Modules - DOE O 433.1B, Maintenance Management...  

Broader source: Energy.gov (indexed) [DOE]

for the following maintenance-related terms? Corrective Preventive Reliability-centered Note: If you think that you can complete the practice at the end of this...

467

E-Print Network 3.0 - activity maintenance study Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: activity maintenance study Page: << < 1 2 3 4 5 > >> 1 Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation...

468

E-Print Network 3.0 - aircraft maintenance workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mathematics 97 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: worker performing the servicing or maintenance, is provided...

469

E-Print Network 3.0 - advanced integrated maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Abstract One of the major concerns of any maintenance Source: Basili, Victor R. - Fraunhofer Center & Department of Computer Science, University of Maryland at College Park...

470

E-Print Network 3.0 - advanced maintenance technology Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Impact of RFID technologies on helicopter processes: Assessment on customer oriented Charlotte JIMENEZa,b Summary: maintenance process. Section 2 and 3 concentrate on the...

471

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic...

472

E-Print Network 3.0 - aircraft maintenance personnel Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Learn about the critical factors involved Summary: , operation and maintenance of aging aircraft n Anyone involved in the field of aviation emergency response... .S. public...

473

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13...  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power...

474

Structural Analysis of Human and Bovine Bone for Development of Synthetic Materials  

E-Print Network [OSTI]

bones, as well as mimicking nature by developing a synthetic material to repair bones. Experimentally, bovine bone, tumor-free human bone, and cancerous human bone were studied via the small scale mechanical loading test. Failure analysis was conducted...

Jang, Eunhwa

2012-10-19T23:59:59.000Z

475

Productivity improvement for longwall development  

SciTech Connect (OSTI)

Industry survey reveals coal operators thoughts about the use of different techniques to keep development ahead of longwall production. Factors considered that can optimise productivity include mine design (the number of entries, size of pillars etc.), work schedules, preventative maintenance programs and good management. The article was adapted from a presentation to Longwall USA 2005, in June 2005 (Pittsburgh, PA, USA). 3 figs.

Whipkey, K. [Norwest, Ashland, KY (United States)

2005-08-01T23:59:59.000Z

476

Survey of Companies in Machine Health Monitoring and Maintenance Company Capability Software Application Modeling Technique  

E-Print Network [OSTI]

Safety and Security Neural networks IVARA www.ivara.com · Reliability centered maintenance solutions IVARA.ERS (expert system) UNKNOWN Expert Systems Aladon www.aladon.co.uk · Reliability centered General Physics Corporation www.gpworldwide.com · Predictive maintenance · Equipment reliability

Huang, Samuel H.

477

Field of Pipe Dreams: Minimizing Maintenance Cost for Hand-Moved  

E-Print Network [OSTI]

Field of Pipe Dreams: Minimizing Maintenance Cost for Hand-Moved Irrigation Systems February 6, 2006 1 #12;Page 2 of 12 Control #23 Contents 1 Field and pipe set layout 4 2 Pressure loss 4 2 uniformity requirement. We define `maintenance time' provisionally to be the number of 20-meter pipes

Morrow, James A.

478

COMPARING MAINTENANCE APPROACHES FOR TOKAMAK FUSION POWER PLANTS* Lester M. Waganer  

E-Print Network [OSTI]

desirable maintenance scheme and reactor design approach to consider for the next generation, advanced of fusion plants are extremely important as they directly determine the plant availability and, ultimately-AT power core2 is the design basis for this comparison. One possible maintenance approach is the in- situ

California at San Diego, University of

479

Evaluating maintenance policies by quantitative modeling and analysis Enrico Zio1,2,*  

E-Print Network [OSTI]

concerning the stochastic crack growth of a generic mechanical component subject to fatigue degradation relevance of maintenance in all sectors of industry; the main reasons are: the extensive mechanization, in refineries the maintenance and operations departments are usually the largest (Dekker 1996) and in various

Boyer, Edmond

480

MAINTENANCE APPROACHES FOR ARIES-CS COMPACT STELLARATOR POWER CORE , S. Malang2  

E-Print Network [OSTI]

.R. Raffray1 and the ARIES Team 1 Center for Energy Research, 460 EBU-II, University of California-San Diego and maintenance ports have been conceptually defined. These are summarized in this paper. Blanket concepts of the coil system; (2) modular replacement approach through maintenance ports arranged between each pair

Raffray, A. René

Note: This page contains sample records for the topic "development maintenance repair" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol  

E-Print Network [OSTI]

A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol , G. Casazza are changing the landscape of several different areas, ranging from infor- mation gathering/managing and commerce to software de- velopment, maintenance and evolution. Software compa- nies having a geographically

Di Penta, Massimiliano

482

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

483

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th  

E-Print Network [OSTI]

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

Firestone, Jeremy

484

A Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional Stormwater Management  

E-Print Network [OSTI]

operations and maintenance. Due to increasing requirements for more effective treatment of runoff, and a subsurface gravel wetland, to $11-$21 per kg/yr TSS removed for a wet pond, a dry pond, and a sand filter maintenance burdens (as measured by cost and personnel hours) and higher water quality treatment capabilities

485

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues  

SciTech Connect (OSTI)

Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

Wang, Liping; Hong, Tianzhen

2013-01-01T23:59:59.000Z

486

THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES  

SciTech Connect (OSTI)

The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

Harris, S.; Gross, R.

2014-04-01T23:59:59.000Z

487

Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs  

Broader source: Energy.gov [DOE]

AIKEN, S.C. – More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

488

USE OF COMPOSITE MATERIALS TO REPAIR STEEL STRUCTURES VULNERABLE TO FATIGUE DAMAGE  

E-Print Network [OSTI]

This study investigates mainly two different topics related to the use of CFRP's for strengthening and repair of steel bridges: the use of CFRP's to prevent damage in fatigue vulnerable welded connections prior to fatigue-crack initiation...

Alemdar, Fatih

2010-01-01T23:59:59.000Z

489

Consistency Management with Repair Actions Christian Nentwich, Wolfgang Emmerich and Anthony Finkelstein  

E-Print Network [OSTI]

Consistency Management with Repair Actions Christian Nentwich, Wolfgang Emmerich and Anthony Finkelstein Department of Computer Science University College London Gower Street, London WC1E 6BT, UK {c.nentwich,w.emmerich

van der Hoek, André

490

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH  

E-Print Network [OSTI]

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

Ickert-Bond, Steffi

491

E-Print Network 3.0 - aortic repair pushing Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for: aortic repair pushing Page: << < 1 2 3 4 5 > >> 1 Mechanobiology of the Aortic Heart Valve Jonathan T. Butcher1 Summary: ;13:798-803 18. Deck JD, Thubrikar MJ, Schneider...

492

Using 3D Painting to Build and Repair Parts | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

spray as an alternate way to repair or coat parts involved in oil and gas drilling and turbo machinery. Cold spray's future benefits include extended product lifespan and reduced...

493

Tiny Terminators: New Micro-Robots Assemble, Repair Themselves and Are Surprisingly Strong  

Broader source: Energy.gov [DOE]

Tiny robots that can assemble and repair themselves? Watch a video of Argonne National Laboratory's micro-robots that easily perform tasks that can challenge other robots, including moving objects that are larger than themselves.

494

Ectodysplasin signaling in cutaneous appendage development: Dose, duration and diversity   

E-Print Network [OSTI]

The development of several skin appendages is guided by prenatal Ectodysplasin signalling. Cui et al. (this issue, 2009) report on the dose and duration of Ectodysplasin signalling required for the maintenance and morphogenesis ...

Headon, Denis J.

2009-01-01T23:59:59.000Z

495

RESTORING A DAMAGED 16-YEAR -OLD INSULATING POLYMER CONCRETE DIKE OVERLAY: REPAIR MATERIALS AND TECHNOLOGIES.  

SciTech Connect (OSTI)

The objective of this program was to design and formulate organic polymer-based material systems suitable for repairing and restoring the overlay panels of insulating lightweight polymer concrete (ILPC) from the concrete floor and slope wall of a dike at KeySpan liquefied natural gas (LNG) facility in Greenpoint, Brooklyn, NY, just over sixteen years ago. It also included undertaking a small-scale field demonstration to ensure that the commercial repairing technologies were applicable to the designed and formulated materials.

SUGAMA,T.

2007-01-01T23:59:59.000Z

496

Endovascular Abdominal Aortic Aneurysm Repair in the Presence of a Kidney Transplant: Therapeutic Considerations  

SciTech Connect (OSTI)

Abdominal aortic aneurysm (AAA) repair in the presence of a kidney transplant can be extremely challenging, as it carries significant risks of renal ischemia. Endovascular repair is an attractive option, as it can be performed with little or no impairment of renal arterial flow. We describe the endovascular management of a recurrent AAA in a patient with a functioning renal transplant using a custom-made aorto-uni-iliac device. We discuss the planning and the potential problems of the technique.

Karkos, Christos D., E-mail: ckarkos@hotmail.com; McMahon, Greg [Leicester Royal Infirmary, Department of Vascular and Endovascular Surgery (United Kingdom); Fishwick, Guy [Leicester Royal Infirmary, Department of Radiology (United Kingdom); Lambert, Kelly; Bagga, Ajay; McCarthy, Mark J. [Leicester Royal Infirmary, Department of Vascular and Endovascular Surgery (United Kingdom)

2006-04-15T23:59:59.000Z

497

Laser engineered net shaping (LENS) for the repair and modification of NWC metal components.  

SciTech Connect (OSTI)

Laser Engineered Net Shaping{trademark} (LENS{reg_sign}) is a layer additive manufacturing process that creates fully dense metal components using a laser, metal powder, and a computer solid model. This process has previously been utilized in research settings to create metal components and new material alloys. The ''Qualification of LENS for the Repair and Modification of Metal NWC Components'' project team has completed a Technology Investment project to investigate the use of LENS for repair of high rigor components. The team submitted components from four NWC sites for repair or modification using the LENS process. These components were then evaluated for their compatibility to high rigor weapons applications. The repairs included hole filling, replacement of weld lips, addition of step joints, and repair of surface flaws and gouges. The parts were evaluated for mechanical properties, corrosion resistance, weldability, and hydrogen compatibility. This document is a record of the LENS processing of each of these component types and includes process parameters, build strategies, and lessons learned. Through this project, the LENS process was shown to successfully repair or modify metal NWC components.

Atwood, Clinton J.; Smugeresky, John E. (Sandia National Labs, Livermore,CA); Gill, David Dennis

2006-11-01T23:59:59.000Z

498

In situ repair of a failed compression fitting  

DOE Patents [OSTI]

A method and apparatus for the in situ repair of a failed compression fitting is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

Wolbert, R.R.; Jandrasits, W.G.

1985-08-05T23:59:59.000Z

499

In situ repair of a failed compression fitting  

DOE Patents [OSTI]

A method and apparatus for the in situ repair of a failed compression fitg is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

Wolbert, Ronald R. (McKees Rocks, PA); Jandrasits, Walter G. (Pittsburgh, PA)

1986-01-01T23:59:59.000Z

500

Development of Quality Assurance Methods for Performance-Based Maintenance Contracts for Roadway Assets  

E-Print Network [OSTI]

................................................... 34 Figure 3.4 Pooled Standard Deviation Values in Tyler District .................................... 37 Figure 3.5 Required Sample Size for e=0.04, CL=90%................................................. 38 Figure 3.6 Required Sample... Size for e=0.04, CL=95%................................................. 39 Figure 3.7 Required Sample Size for CL=95%, Tyler (4/27/10) ................................... 40 Figure 3.8 Required Sample Size for 10 Mile Project (Tyler), e=0...

Shelton, Debora Brooke

2011-02-22T23:59:59.000Z