Powered by Deep Web Technologies
Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Develop an Institutional Change Action Plan for Sustainability | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability October 8, 2013 - 11:50am Addthis Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular

2

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada) Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada) < Back Eligibility Utility Savings Category Buying & Making Electricity Water Solar Program Info Funding Source Hydro-Quebec State Quebec Program Type Renewables Portfolio Standards and Goals To meet the requirements set out in the Québec government's Sustainable Development Strategy and strategy to ensure the occupancy and vitality of territories, Hydro-Québec has established a Sustainable Development Action Plan for the 2013-2016 period. Published in March 2013, this second action plan ensures the continuation of the efforts initiated by the first plan, which covered the 2009-2013 period. The plan outlines 10 major

3

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

4

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin OMalley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

5

U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S and Russia Develop Action Plan to Enhance Global and Bilateral S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation December 19, 2006 - 9:46am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman and Russian Federal Atomic Energy Agency (Rosatom) Director Sergey V. Kiriyenko last week submitted to U.S. President George W. Bush and Russian President Vladimir Putin a joint work plan that will provide a framework for further bilateral cooperation in the development of nuclear energy technology and deployment. The plan was completed and signed by both parties the week of December 11, 2006, as part of an agreement that stemmed from the G8 Summit in St. Petersburg, Russia, in July of this year.

6

National climate change action plans: Interim report for developing and transition countries  

Science Conference Proceedings (OSTI)

Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

Benioff, R.; Ness, E.; Hirst, J. [eds.

1997-10-01T23:59:59.000Z

7

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

8

Climate Information for Development Needs: An Action Plan for Africa | Open  

Open Energy Info (EERE)

Climate Information for Development Needs: An Action Plan for Africa Climate Information for Development Needs: An Action Plan for Africa Jump to: navigation, search Tool Summary Name: Climate Information for Development Needs: An Action Plan for Africa Agency/Company /Organization: World Meteorological Organization, United Nations Economic Commission for Africa Focus Area: Agriculture Topics: Co-benefits assessment, Pathways analysis Resource Type: Guide/manual Website: www.wmo.int/pages/prog/gcos/Publications/gcos-108.pdf UN Region: "Sub-Saharan Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

9

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

10

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

11

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

12

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec...  

Open Energy Info (EERE)

management and infrastructure projects are already imbued with a culture of sustainability. Nevertheless, as the action plan indicates, Hydro-Qubec plans to harmonize...

13

Climate Action Plan (Manitoba, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Manitoba, Canada) Climate Action Plan (Manitoba, Canada) Eligibility Agricultural Commercial Construction Developer General PublicConsumer Industrial...

14

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

15

Climate Action Plan (New Hampshire)  

Energy.gov (U.S. Department of Energy (DOE))

29 members of Governor John Lynchs Climate Change Policy Task Force developed a Climate Action Plan in 2009. It is aimed at achieving the greatest feasible reductions in greenhouse gas emissions...

16

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agencys State and Local Climate Change Program...

17

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

18

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

19

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

20

Mitigation Action Plan  

Science Conference Proceedings (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Climate Action Plan (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

22

Climate Action Plan (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Ontario, Canada) Climate Action Plan (Ontario, Canada) Eligibility Agricultural Commercial Construction Developer Fuel Distributor General PublicConsumer...

23

Climate Action Plan (Nova Scotia, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Nova Scotia, Canada) Climate Action Plan (Nova Scotia, Canada) Eligibility Agricultural Commercial Construction Developer Industrial InstallerContractor...

24

Climate Action Plan (New Brunswick, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (New Brunswick, Canada) Climate Action Plan (New Brunswick, Canada) Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public...

25

Climate Action Plan (Prince Edward Island, Canada) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Prince Edward Island, Canada) Climate Action Plan (Prince Edward Island, Canada) Eligibility Commercial Developer General PublicConsumer Industrial...

26

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

27

Hungarian climate change action plan  

SciTech Connect

In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

1998-12-31T23:59:59.000Z

28

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

29

National Security Technology Incubator Action Plan  

SciTech Connect

This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

2008-02-28T23:59:59.000Z

30

MIDDLE PARK Conservation Action Plan  

E-Print Network (OSTI)

MIDDLE PARK Conservation Action Plan 2011 Update Plant Species of Focus: Kremmling milkvetch Conservation Initiative Workshop dates: June 26, 2008 and July 6, 2010 Report date: August 25, 2011 Middle Park................................................................................................................... 6 A. Conservation Targets

31

Climate Action Plan (New Orleans)  

Energy.gov (U.S. Department of Energy (DOE))

New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its adaptation to climate change. The CAP will outline...

32

Climate Action Plan (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Climate Policies Provider MN Deparment of Commerce Recognizing the implications that global climate change may have on the

33

SEAB Climate Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan (pdf) More Documents...

34

CELS Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

CELS Diversity & Inclusion Action Plan Computing, Environment & Life Sciences Diversity & Inclusion Action Plan CELS Diversity & Inclusion Action Plan...

35

PSE Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

PSE Diversity & Inclusion Action Plan Physical Sciences & Engineering Diversity & Inclusion Action Plan PSE Diversity & Inclusion Action Plan...

36

EESA Diversity & Inclusion Action Plan | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

EESA Diversity & Inclusion Action Plan Energy Engineering & Systems Analysis Diversity & Inclusion Action Plan EESA Diversity & Inclusion Action Plan...

37

The Climate Change Action Plan: Technical supplement  

SciTech Connect

This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

Not Available

1994-03-01T23:59:59.000Z

38

Climate Action Planning Tool | Open Energy Information  

Open Energy Info (EERE)

Planning Tool Planning Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Action Planning Tool Agency/Company /Organization: National Renewable Energy Laboratory Sector: Climate, Energy Focus Area: Renewable Energy, Buildings, Energy Efficiency, Greenhouse Gas, Industry, - Industrial Processes, People and Policy, Transportation Phase: Prepare a Plan, Develop Finance and Implement Projects Resource Type: Guide/manual, Online calculator User Interface: Website Website: www.nrel.gov/applying_technologies/planning_tool/ Web Application Link: www.nrel.gov/applying_technologies/planning_tool/gather_data.cfm Cost: Free Overview This tool is a step by step calculator to find the impact of various technologies to an overall action plan. The target of the tool is research

39

REMEDIAL ACTION PLAN  

E-Print Network (OSTI)

designated site consists of the 111-acre tailings pile, the mill yard, and piles of demolition rubble awaiting burial. The site contains 2.659 million cubic yards of tailings including 277,000 cubic yards of contaminated material in the mill yard, ore storage area, and Ann Lee Mine area; 151,000 cubic yards in the protore storage and leach pad areas; and 664,000 cubic yards of windblown contaminated soil, including excess soil that would result from excavation. Remedial action The remedial action will start with the excavation of windblown contaminated material and placement around the west, south, and east sides of the pile to buttress the slopes for increased stability. Most of the demolition rubble will be placed in the southern part of the pile and be covered with tailings. The northern part of the tailings pile (one million cubic yards) will then be excavated and placed on the south part of the pile to reduce the size of the disposal cell footprint. Demolition rubble that

Inactive Uranium; Mill Tailings Site; Uranium Mill Tremedial

1990-01-01T23:59:59.000Z

40

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network (OSTI)

, financially and philosophically, to a carbon-neutral future. Since the signing, he and the university have sustainability. Additional Strategies and Projects Transportation Currently, transportation accounts for less, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends

Taylor, Jerry

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

2010 Climate Action Plan Environmental  

E-Print Network (OSTI)

by utilizing the energy conservation loan fund and Sustainable Campus Initiative Fund for exceeding typical occupants and facilities' staff to monitor and improve the energy usage of buildings. · Utilizingsub2010 Climate Action Plan Energy and Environmental Stewardship Initiative: Prepared by: The Office

Feschotte, Cedric

42

Climate Action Plan (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland) Maryland) Climate Action Plan (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Climate Policies Provider Maryland Department of Natural Resources On April 20, 2007, Governor Martin O'Malley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to address the causes

43

Climate Action Plan (Kentucky) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kentucky) Kentucky) Climate Action Plan (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kentucky Program Type Climate Policies Provider Kentucky Department for Energy Development and Independence The Commonwealth of Kentucky established the Kentucky Climate Action Plan

44

Lessons Learned: Creating the Chicago Climate Action Plan | Open Energy  

Open Energy Info (EERE)

Lessons Learned: Creating the Chicago Climate Action Plan Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan Agency/Company /Organization City of Chicago Partner Global Philanthropy Partnership, ICLEI Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Topics Low emission development planning Resource Type Lessons learned/best practices Availability Free Publication Date 6/1/2008 Website http://www.chicagoclimateactio Locality Chicago, IL References Lessons Learned: Creating the Chicago Climate Action Plan[1] Overview

45

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

46

Implement an Institutional Change Action Plan for Sustainability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability October 8, 2013 - 11:54am Addthis Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted. Action plans lay out the set of strategies a Federal agency will roll out

47

Climate Action Plan (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maine) Maine) Climate Action Plan (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Climate Policies Provider Department of Environmental Protection In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan

48

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

49

EIS-0397: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

50

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

51

Energy management action plan: Developing a strategy for overcoming institutional barriers to municipal energy conservation  

SciTech Connect

Energy offices working to improve efficiency of local government facilities face not only technical tasks, but institutional barriers, such as budget structures that do not reward efficiency, a low awareness of energy issues, and purchasing procedures based only on minimizing initial cost. The bureau, in working to remove such barriers in San Francisco, has identified 37 institutional barriers in areas such as operations & maintenance, purchasing, and facility design; these barriers were then reorganized into three groupings-- policy & attitudes, budget & incentives, and awareness & information-- and mapped. This map shows that the barriers mutually reinforce each other, and that a holistic approach is required for permanent change. The city`s recreation & parks department was used as a model department, and information about facility energy use was compiled into a departmental energy review. Staff interviews showed how barriers affect conservation. The bureau then generated ideas for projects to remove specific barriers and rated them according to potential impact and the resources required to implement them. Four of the six projects selected focused on maintenance staff: a cost- sharing lighting retrofit program, a boiler efficiency program, a departmental energy tracking system, and a budgetary incentive program for conservation. The other two projects are city-wide: promotion of a new term contract supplying energy-efficient light materials, and publication/distribution of ENERGY NEWS newsletter. A general methodology, the EMAP Strategy Guide, has been created to assist other energy offices in developing EMAPs.

1992-12-31T23:59:59.000Z

52

Argentina-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Argentina-Mitigation Action Plans and Scenarios (MAPS) Argentina-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Argentina-Mitigation Action Plans and Scenarios (MAPS) Name Argentina-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Argentina South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

53

Colombia-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Colombia-Mitigation Action Plans and Scenarios (MAPS) Colombia-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Colombia-Mitigation Action Plans and Scenarios (MAPS) Name Colombia-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Colombia South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

54

Brazil-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Brazil-Mitigation Action Plans and Scenarios (MAPS) Brazil-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Brazil-Mitigation Action Plans and Scenarios (MAPS) Name Brazil-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Brazil South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

55

NREL: Technology Deployment - Climate Action Planning Tool -...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Deployment - Climate Action Planning Tool Step 1 of 4 Step 1: Gather Baseline Energy Consumption Data Download the sample data sheet below, gather your numbers, and...

56

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Memoranda and Action Plan to support the Presidents mandate directing the improvement of the Federal recruitment and hiring process throughout the Federal government.

57

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

58

Disabled Veterans Affirmative Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disabled Veterans Affirmative Action Plan Disabled Veterans Affirmative Action Plan Guide for the Disabled Veterans' Affirmative Action Program (DVAAP) 2013 DVAAP Responsible...

59

City of Aspen Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Aspen Climate Action Plan Aspen Climate Action Plan Jump to: navigation, search Name City of Aspen Climate Action Plan Agency/Company /Organization City of Aspen Sector Energy, Water, Land Focus Area Buildings, Commercial, Residential, Offsets and Certificates, Economic Development, Goods and Materials - Embodied Energy, Industry - Industrial Processes, Greenhouse Gas, Land Use, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass - Biofuels, Biomass, Geothermal, Water Power, Biomass - Landfill Gas, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Resource Type Case studies/examples Availability Free - Publicly Available Publication Date 5/1/2007

60

Emergency Action Plan (EAP) Template  

NLE Websites -- All DOE Office Websites (Extended Search)

00q09e011.doc i (042013) Local Emergency Plan BUILDING: COMPLEX: ZONE: PLAN APPROVAL DATE: Approved by Name Signature Date Local Emergency Coordinator John Cintorino Facility...

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1923: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This Mitgation Action Plan specifies the methods for implementing mitigation measures that address the potential environmental impacts identified in DOE/EA-1923 and by the USFWS Biological Opinion issued to DOE on February 1, 2012, in accordance with the Endangered Species Act (ESA) (16 U.S.C.1531 et seq.). The development of these measures and an implementation plan, are a necessary condition for the DOE FONSI, as described by 40 CFR 1021.331(b) Mitigation action plans. EA-1923-MAP-2013 More Documents & Publications EA-1923: Final Environmental Assessment EA-1923: Draft Environmental Assessment EA-1923: Mitigated Finding of No Significant Impact

62

Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information  

Open Energy Info (EERE)

(Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Logo: Mitigation Action Plans and Scenarios (MAPS) Name Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Argentina, Brazil, Chile, Colombia, Peru, South Africa South America, South America, South America, South America, South America, Southern Africa References Mitigation Action Plans and Scenarios (MAPS)[1]

63

EA-1934: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This Mitigation Action Plan is an integral part of the Finding of No...

64

Stage 4: Prioritizing and Planning for Actions | Open Energy Information  

Open Energy Info (EERE)

Stage 4: Prioritizing and Planning for Actions Stage 4: Prioritizing and Planning for Actions Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

65

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

66

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

67

Climate Action Plan (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Florida) Florida) Climate Action Plan (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Climate Policies On July 12 and 13, 2007, Governor Charlie Crist hosted "Serve to Preserve: A Florida Summit on Global Climate Change." The summit brought

68

Climate Action Plan (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts) Massachusetts) Climate Action Plan (Massachusetts) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Massachusetts Program Type Climate Policies In August 2008, Governor Deval Patrick signed into law the Global Warming Solutions Act (GWSA), making Massachusetts one of the first states in the

69

Climate Action Plan (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont) Vermont) Climate Action Plan (Vermont) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Climate Policies Provider Vermont Agency of Natural Resources There is a growing scientific consensus that increasing emissions of greenhouse gases to the atmosphere are affecting the temperature and

70

Climate Action Plan (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Climate Policies Provider Department of Environmental Protection The Office of Pollution Prevention and Energy Assistance works with

71

Climate Action Plan (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Montana) Climate Action Plan (Montana) Climate Action Plan (Montana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Montana Program Type Climate Policies Provider Department of Environmental Quality Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in Montana, the Climate Change Advisory Committee (CCAC) was established with

72

Climate Action Plan (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Michigan) Climate Action Plan (Michigan) Climate Action Plan (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Climate Policies Provider Michigan Department of Environmental Quality On November 14, 2007, Governor Jennifer M. Granholm issued Executive Order

73

Climate Action Plan (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Climate Policies Provider University of Wisconsin In April 2007, Governor Doyle signed Executive Order 191 which brought

74

EA-1440: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

440: Mitigation Action Plan 440: Mitigation Action Plan EA-1440: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex The Department of Energy has issued a Supplemental Environmental Assessment and has prepared a Finding of No Significant Impact for three site development projects at the National Renewable Energy Laboratory's South Table Mountain site at Golden, Colorado. 1) Construction of the Research Support Facilities, a new office building or multi-building office complex; 2) Installation of phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); and 3) Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant. Mitigation Action Plan for the Supplement to the Final Site-Wide

75

EA-1440-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant

76

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

77

Workshop on the preparation of climate change action plans. Workshop summary  

SciTech Connect

Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

NONE

1999-05-24T23:59:59.000Z

78

Berkeley's Climate Action Plan: Opportunities for Collaboration...  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley's Climate Action Plan: Opportunities for Collaboration with LBNL Speaker(s): Neal De Snoo Date: September 10, 2009 - 12:00pm Location: 90-3122 This presentation will...

79

DOE Action Plan Addressing the Electricity Distribution System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION PLAN ACTION PLAN ADDRESSING THE ELECTRICITY DISTRIBUTION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Distribution System 1 Table of Contents INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ................................................................................................ 2 Focus on Distribution .............................................................................................. 3 Roadmap Goals ....................................................................................................... 3 PROCESS OVERVIEW ........................................................................................................... 4

80

Climate Action Plan (North Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

The North Carolina Department of Environmental and Natural Resources (DENR) has established a priority in the 2009 - 2013 Strategic Plan to respond to climate change using both mitigation and...

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Fact Sheet: National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet: National Biofuels Action Plan Sheet: National Biofuels Action Plan Fact Sheet: National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis In an effort to meet President Bush's "Twenty in Ten" goal and meet the Renewable Fuel Standard (RFS) targets in the Energy Independence and Security Act of 2007 (EISA) the Biomass Research and Development Board (the Board)-co-chaired by the U.S. Department of Agriculture (USDA) and the U.S. Department of Energy (DOE)-developed the National Biofuels Action Plan (NBAP) to accelerate the development of a sustainable biofuels industry. To meet increasing demand, we must continue to advance solutions that improve our energy security and reduce greenhouse gas emissions - our economic competitiveness, national security, and environmental health

82

Chile-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Chile-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Chile-Mitigation Action Plans and Scenarios (MAPS) Name Chile-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Chile South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru

83

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

84

FTCP Corrective Action Plan- Revision 1  

Energy.gov (U.S. Department of Energy (DOE))

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

85

FTCP Corrective Action Plan- Revision 2  

Energy.gov (U.S. Department of Energy (DOE))

March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

86

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming...

87

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

88

City of Boulder - Climate Action Plan Fund | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan Fund City of Boulder - Climate Action Plan Fund Eligibility Commercial Industrial Residential Program Information Colorado Program Type Public Benefits Fund In...

89

United States -Japan Joint Nuclear Energy Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan...

90

Implementation Proposal for the National Action Plan on Demand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to...

91

EA-1617: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan EA-1617: Mitigation Action Plan Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, Big Horn and Carbon Counties,...

92

EIS-0422: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

93

Burundi-National Adaptation Plan of Action to Climate Change...  

Open Energy Info (EERE)

Burundi-National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany...

94

EA-1858: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EA-1858: Mitigation Action Plan Nippon Paper Industries USA Company Biomass Cogeneration Project The Department of Energy has prepared a final environmental...

95

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

96

EA-1611: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1611: Mitigation Action Plan Colorado Highlands Wind Project, Logan County, Colorado Colorado Highlands Wind LLC applied to Western Area Power...

97

Vietnam-Renewable Energy Action Plan | Open Energy Information  

Open Energy Info (EERE)

Renewable Energy Action Plan Jump to: navigation, search Name Vietnam-Renewable Energy Action Plan AgencyCompany Organization World Bank Sector Energy Focus Area Renewable Energy...

98

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

99

Remedial action planning for Trench 1  

SciTech Connect

The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Greengard, T. [Kaiser Hill/SAIC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

100

Federal Energy Management Program: Develop an Institutional Change Action  

NLE Websites -- All DOE Office Websites (Extended Search)

Develop an Develop an Institutional Change Action Plan for Sustainability to someone by E-mail Share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Facebook Tweet about Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Twitter Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Google Bookmark Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Delicious Rank Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on Digg Find More places to share Federal Energy Management Program: Develop an Institutional Change Action Plan for Sustainability on AddThis.com...

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

102

Release of the National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Release of the National Biofuels Action Plan Release of the National Biofuels Action Plan Release of the National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis Remarks as Prepared for Delivery by Secretary Bodman Thank you, John Mizroch. It's good to be here with Tom Dorr and with Secretary Schafer. Our two departments' collaboration on biofuels development, begun years ago, has only strengthened over time due in large part to your personal attention and leadership. I am pleased to be here with you to unveil the National Biofuels Action Plan which, as Secretary Schafer just said, is a strategic blueprint that shows us the way to meet the President's goal of meaningful biofuels production by the year 2022. And to do it in cost-effective, environmentally-responsible ways that utilize a science-based approach to

103

2012 National Energy Assurance Planning Conference After-Action Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assurance Planning Conference After-Action Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the Department of Energy, in coordination with the National Association of State Energy Officials (NASEO), held the National Energy Assurance Planning Conference. The conference culminated three years of DOE's ongoing American Recovery and Reinvestment Act of 2009 (ARRA) State and Local Energy Assurance Program (SLEAP). SLEAP seeks to develop new-or refine existing-energy assurance and emergency preparedness plans, which contribute to the resiliency of the energy sector by focusing on the entire energy supply system. The conference served as an important venue for State and local energy

104

Climate Action Planning Tool Formulas and Assumptions  

NLE Websites -- All DOE Office Websites (Extended Search)

CLIMATE ACTION PLANNING TOOL FORMULAS AND ASSUMPTIONS Climate Action Planning Tool Formulas and Assumptions The Climate Action Planning Tool calculations use the following formulas and assumptions to generate the business-as-usual scenario and the greenhouse gas emissions reduction goals for the technology options. Business-as-Usual Scenario All Scope 1 (gas, oil, coal, fleet, and electricity) and Scope 2 calculations increase at a rate equal to the building growth rate. Scope 3 calculations (commuters and business travel) increase at a rate equal to the population growth rate. Assumptions New buildings will consume energy at the same rate (energy use intensity) as existing campus buildings. Fleet operations will be proportional to total building area.

105

Better Buildings Neighborhood Program: Step 3: Develop Plans...  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Workforce Development Step 3: Develop Plans of Action Process Mapping for Problem Solving Austin Energy's detailed planning process was critical to the successful...

106

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

107

United States-Japan Joint Nuclear Energy Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan An outline on the United States and Japan's joint nuclear energy action...

108

A temporal description logic for reasoning about actions and plans  

Science Conference Proceedings (OSTI)

A class of interval-based temporal languages for uniformly representing and reasoning about actions and plans is presented. Actions are represented by describing what is true while the action itself is occurring, and plans are constructed by temporally ...

Alessandro Artale; Enrico Franconi

1998-08-01T23:59:59.000Z

109

PICEANCE BASIN Conservation Action Plan  

E-Print Network (OSTI)

sites Lead Notes Energy development, associated roads and infrastructure Dudley Bluffs BLM Continue revision. Low BLM 2013 Energy development, associated roads and infrastructure Dudley Bluffs private that is conducted with federal funds would be responsible for the plants under the ESA. County WAS pre- consulting

110

Action plan for the Tiger Team assessment report  

Science Conference Proceedings (OSTI)

This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

Not Available

1990-08-30T23:59:59.000Z

111

NORTH ANNA POWER STATION RESTART ACTION PLAN (PUBLIC) Initial Action Plan: 10/7/2011  

E-Print Network (OSTI)

The goal of this action plan is to identify and coordinate the agencys ongoing initiatives related to the North Anna Power Station (NAPS) restart decision as a result of the recent seismic event

Tac Nos Me

2011-01-01T23:59:59.000Z

112

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

186: Mitigation Action Plan 186: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

113

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

114

Climate Action Plan (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ontario, Canada) Ontario, Canada) Climate Action Plan (Ontario, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 2011 State Ontario Program Type Climate Policies Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate

115

Climate Action Plan (Nova Scotia, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nova Scotia, Canada) Nova Scotia, Canada) Climate Action Plan (Nova Scotia, Canada) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Institutional Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nova Scotia Program Type Climate Policies Provider Nova Scotia Environment Nova Scotia's Climate Change Action Plan has two main goals: reducing the province's contribution to climate change by reducing greenhouse gas (GHG) emissions and preparing for changes to the province's climate that are already inevitable. REDUCING GREENHOUSE GAS EMISSIONS

116

Smart Buildings: Business Case and Action Plan  

SciTech Connect

General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

Ehrlich, Paul; Diamond, Rick

2009-04-01T23:59:59.000Z

117

EA-1508: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

508: Mitigation Action Plan 508: Mitigation Action Plan EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado This is the mitigation action plan (MAP) for use during construction of the Beaver Creek-Hoyt-Erie transmission line upgrades, including right-of ways (ROWS), hydrology, vegetation, construction debris and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 More Documents & Publications EA-1617: Mitigation Action Plan EA-1456: Mitigation Action Plan EA-1611: Mitigation Action Plan

118

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the...

119

2007 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7,2007 7,2007 The Honorable A. J. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington, D.C. 20004-290 1 Dear Mr. Chairman: Enclosed is Federal Technical Capability Program (FTCP) Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, Revision 2, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1. This plan has been updated to identify the completed and remaining Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE'S mission. The plan is approved and issued for implementation, effective

120

l lI ACTION PLAN FOR PERFORMANCE BASED SEISMIC ...  

Science Conference Proceedings (OSTI)

Page 1. FEDERAL EMERGENCY MdANAGEVENT AGENCY FEDERAL EMERGENCY MANAGEMENT AGENCY gl llI ACTION PLAN a FOR ...

2007-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Greenhouse gas action plan for the transportation sector in Iowa  

SciTech Connect

The purpose of this research has been to identify ways in which the state of Iowa can do its part in reducing greenhouse gas emissions in its transportation sector. A variety of strategies and policy actions for reducing greenhouse gas emissions in Iowa are explored in this report. Some of these actions would be relatively easy to implement, while others would require significant changes in how people live and travel. The authors` work on this research effort has been conducted in tandem with a larger study to develop a greenhouse gas action plan for Iowa.

Ney, R.A.; Schnoor, J.L.; Foster, N.S.J.; Forkenbrock, D.J.

1997-12-31T23:59:59.000Z

122

Graphite technology development plan  

Science Conference Proceedings (OSTI)

This document presents the plan for the graphite technology development required to support the design of the 350 MW(t) Modular HTGR within the US National Gas-Cooled Reactor Program. Besides descriptions of the required technology development, cost estimates, and schedules, the plan also includes the associated design functions and design requirements.

NONE

1986-07-01T23:59:59.000Z

123

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

David Kathan, Ph.D David Kathan, Ph.D Federal Energy Regulatory Commission U.S. DOE Electricity Advisory Committee October 29, 2010 Demand Response as Power System Resources The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission 2 Demand Response * FERC (Order 719) defines demand response as: - A reduction in the consumption of electric energy by customers from their expected consumption in response to an increase in the price of electric energy or to in incentive payments designed to induce lower consumption of electric energy. * The National Action Plan on Demand Response released by FERC staff broadens this definition to include - Consumer actions that can change any part of the load profile of a utility or region, not just the period of peak usage

124

Climate Action Plan (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Connecticut) Connecticut) Climate Action Plan (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Connecticut Program Type Climate Policies Provider Department of Energy and Environmental Protection Connecticut's climate change initiative is led and directed by the

125

Climate Action Plan (Arkansas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arkansas) Arkansas) Climate Action Plan (Arkansas) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State Arkansas Program Type Climate Policies With the signing of Act 696 of the Arkansas 86th General Assembly (HB2460), Governor Mike Beebe established the Governor's Commission on Global

126

Climate Action Plan (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virginia) Virginia) Climate Action Plan (Virginia) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Climate Policies Provider Virginia Department of Environmental Qualiry Governor Timothy M. Kaine established the Governor's Commission on Climate

127

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 ACTUAL FORECAST National Action Plan on Demand Response the feDeRal eneRgy RegulatoRy commission staff 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 National Action Plan on Demand Response THE FEDERAL ENERGY REGULATORY COMMISSION STAFF June 17, 2010 Docket No. AD09-10 Prepared with the support of The Brattle Group * GMMB * Customer Performance Group Definitive Insights * Eastern Research Group The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission.

128

2009 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O. Box 5400 O. Box 5400 Albuquerque, NM 87185 The Honorable A.I. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington D.C. 20004-2901 Dear Mr. Chairman: MAR 1 9 2009 Enclosed is the Federal Technical Capabilities Program (FTCP) Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1. This plan has been updated to identify that all Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE's mission have been completed. This revised

129

Clean slate corrective action investigation plan  

SciTech Connect

The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

NONE

1996-05-01T23:59:59.000Z

130

National Action Plan on Demand Response, June 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand Response, June 2010 Action Plan on Demand Response, June 2010 National Action Plan on Demand Response, June 2010 The Federal Energy Regulatory Commission (FERC) is required to develop the National Action Plan on Demand Response (National Action Plan) as outlined in section 529 of the Energy Independence and Security Act of 2007 (EISA), entitled "Electricity Sector Demand Response." This National Action Plan is designed to meet three objectives: Identify "requirements for technical assistance to States to allow them to maximize the amount of demand response resources that can be developed and deployed." Design and identify "requirements for implementation of a national communications program that includes broad-based customer education and support."

131

Energy-MAP: energy management and action plan  

DOE Green Energy (OSTI)

The City of Garden Grove created an energy program within its municipal operation during 1980, and subsequently developed the Energy Management and Action Plan (Energy-MAP). A community energy audit was conducted and an energy policy was developed. The policy established general guidelines for the Energy-MAP. The plan was designed to be a working document to guide in the future development of specific objectives and strategies to address the problems of increasing demand for energy resources, rapidly increasing costs of energy resources, and potential shortages or inadequate supplies of energy available to the community. Energy-MAP is described. The internal components address primary government operations, including vehicle fleet operations, municipal buildings operations, employee programs, lighting energy management, and water services operations. The external components include a community education/communications design, a transportation efficiency plan, information on potential alternative energy resources development, and a preliminary draft energy element.

Not Available

1981-12-15T23:59:59.000Z

132

24 Command Fire Improvement Action Program Plan  

SciTech Connect

Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

GRIFFIN, G.B.

2000-12-01T23:59:59.000Z

133

Climate Action Plan (Delaware) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware) Delaware) Climate Action Plan (Delaware) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Climate Policies Provider Delaware Division of Energy and Climate To better understand the current and future vulnerabilities and risks to climate change, DNREC Secretary Collin O'Mara directed the Division of

134

Microsoft Word - Mitigation Action Plan.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

782 782 MITIGATION ACTION PLAN FOR THE UNIVERSITY OF DELAWARE LEWES CAMPUS ONSITE WIND ENERGY PROJECT DECEMBER 2010 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1000 Independence Avenue, SW Washington, D.C. 20585 1.0 INTRODUCTION The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) to aid its decision whether to provide funding for the University of Delaware's construction and operation of a 2-megawatt wind turbine adjacent to the University's College of Earth, Ocean, and Environment Campus in Lewes, Delaware. The EA (DOE/EA-1782) for the University's Wind Energy Project was completed in compliance with the National Environmental Policy Act (NEPA) and implementing regulations issued by the Council on Environmental Quality and

135

Ecuador-Quito City Climate Change Action Plan | Open Energy Information  

Open Energy Info (EERE)

Ecuador-Quito City Climate Change Action Plan Ecuador-Quito City Climate Change Action Plan Jump to: navigation, search Name Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

136

CDKN-Ecuador-Quito City Climate Change Action Plan | Open Energy  

Open Energy Info (EERE)

Quito City Climate Change Action Plan Quito City Climate Change Action Plan Jump to: navigation, search Name CDKN-Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] CDKN-Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

137

Commonwealth of the Northern Mariana Islands Energy Action Plan  

SciTech Connect

This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

138

Peru-Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information  

Open Energy Info (EERE)

Peru-Mitigation Action Plans and Scenarios (MAPS) Peru-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Peru-Mitigation Action Plans and Scenarios (MAPS) Name Peru-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Peru South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

139

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

140

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EA-1591: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

142

India National Action Plan on Climate Change | Open Energy Information  

Open Energy Info (EERE)

India National Action Plan on Climate Change India National Action Plan on Climate Change Jump to: navigation, search Tool Summary Name: India National Action Plan on Climate Change Agency/Company /Organization: India Prime Minister's Council On Climate Change Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Publications, Case studies/examples Website: pmindia.nic.in/climate_change.htm Country: India Southern Asia Coordinates: 20.593684°, 78.96288° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":20.593684,"lon":78.96288,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

143

Bangladesh Climate Change Strategy and Action Plan | Open Energy  

Open Energy Info (EERE)

Bangladesh Climate Change Strategy and Action Plan Bangladesh Climate Change Strategy and Action Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bangladesh Climate Change Strategy and Action Plan Agency/Company /Organization: Bangladesh Ministry of Environment Sector: Energy, Land Topics: Low emission development planning Resource Type: Publications, Case studies/examples Website: www.moef.gov.bd/moef.pdf Country: Bangladesh Southern Asia Coordinates: 23.684994°, 90.356331° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":23.684994,"lon":90.356331,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

144

Indonesia National Action Plan Addressing Climate Change | Open Energy  

Open Energy Info (EERE)

Indonesia National Action Plan Addressing Climate Change Indonesia National Action Plan Addressing Climate Change Jump to: navigation, search Tool Summary Name: Indonesia National Action Plan Addressing Climate Change Agency/Company /Organization: Indonesia State Ministry of Environment Sector: Energy, Land Topics: Background analysis, Low emission development planning Resource Type: Case studies/examples, Publications Website: climatechange.menlh.go.id/index.php?option=com_docman&task=down&bid=17 Country: Indonesia South-Eastern Asia Coordinates: -0.789275°, 113.921327° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-0.789275,"lon":113.921327,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

145

US State Climate Action Plans | Open Energy Information  

Open Energy Info (EERE)

US State Climate Action Plans US State Climate Action Plans Jump to: navigation, search Tool Summary LAUNCH TOOL Name: US State Climate Action Plans Agency/Company /Organization: Center for Climate Strategies Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Case studies/examples Website: www.climatestrategies.us/Papers_Publications_Presentations.cfm Country: United States Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

146

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

147

Mitigation Action Plans (MAP) and Related Documents | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Delaware Lewes Campus Onsite Wind Energy Project March 1, 2011 EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission...

148

EIS-0380: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos...

149

Study of Long-Term Transport Action Plan for ASEAN | Open Energy  

Open Energy Info (EERE)

Long-Term Transport Action Plan for ASEAN Long-Term Transport Action Plan for ASEAN Jump to: navigation, search Name Study of Long-Term Transport Action Plan for ASEAN Agency/Company /Organization Association of Southeast Asian Nations (ASEAN), Institution for Transport Policy Studies (ITPS), Clean Air Asia, Transport Research Laboratory (TRL), Mizuho Information & Research Institute (MHIR) Partner Nippon Foundation, Ministry of Planning, Ministry of Transport Sector Climate, Land Focus Area Greenhouse Gas, People and Policy, Transportation Topics Background analysis, Baseline projection, Co-benefits assessment, - Environmental and Biodiversity, GHG inventory, Low emission development planning, -LEDS, Pathways analysis, Policies/deployment programs Website http://cleanairinitiative.org/

150

United States -Japan Joint Nuclear Energy Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Japan Joint Nuclear Energy Action Plan -Japan Joint Nuclear Energy Action Plan 1. Introduction 1.1 Background and Objective President Bush of the U n i t e d States and Prime Minister Koizumi of Japan have both stated their strong support for the contribution of nuclear power to energy security and the global environment. Japan w a s the first nation to endorse President Bush's Global Nuclear Energy Partnership. During the June 29,2006 meeting between President Bush and Prime Minister Koizumi, "We discussed research and development that will help speed up fnt breeder reactors and new types of reprocessing so that we cmt help deal with the cost of globalization when it comes to energy; make ourselves more secure, economicallyI a s well n make us less dependent on hycirocmbons ..... " (I)

151

Individual Development Plan (IDP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Individual Development Plan (IDP) Individual Development Plan (IDP) SAMPLE 10/01/2012 to 09/30/2013 Training Reason Developmental Activity Description Training Cost Travel Cost Total Cost Hours Start Date/ Completion Date Short Range Goal 1: Enhance Leadership Skills Development Mentoring Receive mentoring from a higher grade employee (s) and provide mentoring to lower grade employee(s). 0 0 0 TBD 1/1/2013 Development Instructor led EM Leadership Excellence Program - Interpersonal Communication Skills 0 0 0 8 6/15/2013 Development Instructor led Federal Executive Institute (OPM): Leadership for a Democratic Society $18,300 0 0 30 day residential TBD Development Shadowing Shadow one or more SES employees for one or two day period to learn leadership techniques. 0 0 0 TBD TBD

152

EIS-0380: Mitigation Action Plan Annual Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan Annual Report Mitigation Action Plan Annual Report EIS-0380: Mitigation Action Plan Annual Report Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report In Fiscal Year (FY) 2012, the Los Alamos National Laboratory (LANL) Site-Wide Environmental Impact Statement (SWEIS) Project Office focused on tracking and managing mitigation action commitments and reporting. Highlights for FY 2012 include the following: completion and distribution of the FY 2011 SWEIS Mitigation Action Plan Annual Report (DOE 2012), which included a section for the Las Conchas Fire, completion and distribution of the calendar year (CY) 2010 SWEIS Yearbook in April 2012 (LANL 2012a), construction and operation of SERF-E, construction of an institutional

153

EIS-0409: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County Integrated Gasification Combine Cycle Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. Mitigation Action Plan Kemper County Iintegrated Gasification Combined Cycle Project, Kemper County, Mississippi, DOE/EIS-0409 (September 2010)

154

EA-1736: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico Based on the analysis of potential environmental impacts presented in the environmental assessment, neither the construction or operation of the expanded Sanitary Effluent Reclamation Facility considered in the two action alternatives for that facility, nor the environmental restoration action measures considered in the two action alternatives for reach S-2 of Sandia Canyon would have significant environmental impacts. Mitigation Action Plan for the Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia

155

FY14 Affirmative Action Program Plan for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY14 Affirmative Action Program Plan for FY14 Affirmative Action Program Plan for Disabled Veterans 1. PURPOSE: This Affirmative Action Program Plan for Disabled Veterans (Plan) establishes policy and procedures, identifies responsibilities, and in connection with the Department of Energy Operational Plan and Desktop Reference for the Veterans Employment Initiative sets objectives for the Department of Energy (DOE). It has become an attachment to the Operational Plan. 2. SCOPE: The Plan is to serve as the guide for the Disabled Veterans' Affirmative Action Program (DVAAP) for all elements of the Department of Energy (DOE). 3. REFERENCES: A. Equal Employment Opportunity Commission (EEOC) Management Directive (MD) 715 and Guidance: http://www.eeoc.gov/federal/directives/md715instruct.cfm.

156

USDA & DOE Release National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis WASHINGTON - Department of Agriculture (USDA) Secretary Ed Schafer and Department of Energy (DOE) Secretary Samuel W. Bodman today released the National Biofuels Action Plan (NBAP), an interagency plan detailing the collaborative efforts of Federal agencies to accelerate the development of a sustainable biofuels industry. "Federal leadership can provide the vision for research, industry and citizens to understand how the nation will become less dependent on foreign oil and create strong rural economies," Secretary Schafer said. "This National Biofuels Action Plan supports the drive for biofuels growth to

157

UnitedStates-JapanJointNuclenrEnergyActionPlan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UnitedStates-JapanJointNuclenrEnergyActionPlan UnitedStates-JapanJointNuclenrEnergyActionPlan 1.Introduction 1.1BackguPoundandObjective P肥sidentBushoftheUnitedStatesandPrimeMinisterKoizumiofJapanhaveboth statedtheirstrongsupportfbrthecontributionofnuclearpowertoenergysecurityand theglobalenvironmenLJapanwasthefirstnationtoendorsePresidentBush,sGIobal NuclearEnergyParmership. DuringtheJune29,2006meetingbetweenPresidentBushandPIimeMinister

158

LNBL C-5 Electrical Safety Corrective Action Plan 2009  

E-Print Network (OSTI)

of 2 #12;LNBL C-5 Electrical Safety Corrective Action Plan 2009 Page 2 of 2 2. The Task Hazard Analysis exposure to hazardous electrical energy/ LOTO verification. 6. Energized Electrical Work Permit (EEWPLNBL C-5 Electrical Safety Corrective Action Plan 2009 Finding Statement : LBNL has not ensured

Knowles, David William

159

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

160

Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

USDOE /NV

1999-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Clean Slate 1 Corrective Action Plan, Revision 0  

Science Conference Proceedings (OSTI)

This Corrective Action Plan (CAP) has been prepared to meet the requirements specified in the Federal Facility Agreement and Consent Order (FFACO, 1996). A Corrective Action Decision Document (CADD) (DOE, 1997) was submitted to the Nevada Department of Environmental Protection (NDEP) January 31, 1997 for the Clean Slate 1 (CS-1) Site in accordance with the Corrective Action Investigation Plan (CAIP) (DOE, 1996) and the Soils Media Operable Unit Quality Assurance Project Plan (DOE, 1995). The FFACO lists CS-1 as Corrective Action Unit (CAU) number 412.

NONE

1997-04-01T23:59:59.000Z

162

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

163

EA-1706: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

164

EERE Announces Next Steps on President's Climate Action Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan July 3, 2013 - 12:00pm Addthis Photo of President Obama talking at a podium, in front of a banner that says 'U.S. Department of Energy.' On Friday, June 28, the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy hosted a webinar on the energy efficiency aspects of the President's Climate Action Plan. Rick Duke, Associate Director of the White House Council on Environmental Quality and the Domestic Policy Council, provided an overview of President Obama's comprehensive Climate Action Plan to cut the carbon pollution that causes climate change and threatens our health. The Department of Energy's Deputy Assistant Secretary for Energy Efficiency, Kathleen Hogan, provided a

165

EERE Announces Next Steps on President's Climate Action Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan July 3, 2013 - 12:00pm Addthis Photo of President Obama talking at a podium, in front of a banner that says 'U.S. Department of Energy.' On Friday, June 28, the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy hosted a webinar on the energy efficiency aspects of the President's Climate Action Plan. Rick Duke, Associate Director of the White House Council on Environmental Quality and the Domestic Policy Council, provided an overview of President Obama's comprehensive Climate Action Plan to cut the carbon pollution that causes climate change and threatens our health. The Department of Energy's Deputy Assistant Secretary for Energy Efficiency, Kathleen Hogan, provided a

166

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

167

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

168

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

169

CDKN-Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Kenya-Action Plan for National Climate Change Response Strategy Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya UN Region Eastern Africa References CDKN-Kenya-Action Plan for National Climate Change Response Strategy[1]

170

FY 95 engineering work plan for the design reconstitution implementation action plan  

Science Conference Proceedings (OSTI)

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

171

EA-1901: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

172

EIS-0350-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan (MAP) describes mitigation and monitoring commitments for constructing and operating the Modified CMRR-NF. The commitments made in this MAP are designed to mitigate potentially adverse environmental consequences associated with the CMRR-NF Project as the CMRR-NF is constructed and operated, and as direct, indirect, and cumulative impacts from these actions occur over time. EIS-0350-S1-MAP-2011.pdf More Documents & Publications EIS-0350-S1: Final Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement

173

City of Boulder - Climate Action Plan Fund | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Boulder - Climate Action Plan Fund City of Boulder - Climate Action Plan Fund City of Boulder - Climate Action Plan Fund < Back Eligibility Commercial Industrial Residential Program Info State Colorado Program Type Public Benefits Fund Provider City of Boulder In November 2006, citizens of Boulder, Colorado, voted to approve Ballot Issue No. 202, authorizing the city council to levy and collect an excise tax from residential, commercial and industrial electricity customers for the purpose of funding a [http://www.bouldercolorado.gov/files/Environmental%20Affairs/climate%20a... climate action plan] to reduce greenhouse gas emissions. The plan outlines programs to increase energy efficiency, increase renewable energy use, reduce emissions from motor vehicles, and take other steps toward the goal

174

Climate Action Plan (New Brunswick, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brunswick, Canada) Brunswick, Canada) Climate Action Plan (New Brunswick, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Climate Policies Provider New Brunswick Environment and Local Government New Brunswick-led initiatives will result in greenhouse gas emission

175

Climate Action Plan (North Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina) North Carolina) Climate Action Plan (North Carolina) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Climate Policies Provider Department of Environment and Natural Resources The North Carolina Department of Environmental and Natural Resources (DENR)

176

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global...

177

Climate Action Plan | OpenEI Community  

Open Energy Info (EERE)

economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels Syndicate content 429 Throttled (bot load) Error 429 Throttled (bot load)...

178

NEHRP - Final Plan Development  

Science Conference Proceedings (OSTI)

... However, NEHRP funds do not support targeted ... FEMA does provide linkage of ongoing work in ... Plan discussion about Strategic Planning Principles ...

179

Climate Action Plan (New Hampshire) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (New Hampshire) Climate Action Plan (New Hampshire) Climate Action Plan (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Climate Policies Provider Department of Environmental Services 29 members of Governor John Lynch's Climate Change Policy Task Force

180

Climate Action Plan (District of Columbia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (District of Columbia) Climate Action Plan (District of Columbia) Climate Action Plan (District of Columbia) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State District of Columbia Program Type Climate Policies To lead by example, and to capitalize on the many benefits of energy

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada  

SciTech Connect

This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

Bechtel Nevada

1998-08-31T23:59:59.000Z

182

Microsoft Word - Final Mitigated Action Plan - CNMI.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

| P a g e MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT FOR THE GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S....

183

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

184

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

185

The United States Releases its Open Government National Action Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan September 20, 2011 - 1:58pm Addthis Cammie Croft Cammie Croft Senior Advisor, Director of New Media & Citizen Engagement Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more efficient and effective government while ensuring that taxpayers' money is wisely spent. Over the past year, we've taken a number of steps to make the Department more transparent and more participatory, including: Relaunching Energy.gov through a complete overhaul of its front-end and back-end design, making it an interactive information platform while

186

The United States Releases its Open Government National Action Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan September 20, 2011 - 1:58pm Addthis Cammie Croft Cammie Croft Senior Advisor, Director of New Media & Citizen Engagement Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more efficient and effective government while ensuring that taxpayers' money is wisely spent. Over the past year, we've taken a number of steps to make the Department more transparent and more participatory, including: Relaunching Energy.gov through a complete overhaul of its front-end and back-end design, making it an interactive information platform while

187

MITIGATION ACTION PLAN FOR THE OREGON STATE UNIVERSITY WAVE ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 | P a g e MITIGATION ACTION PLAN FOR THE OREGON STATE UNIVERSITY WAVE ENERGY TEST PROJECT ENVIRONMENTAL ASSESSMENT AUGUST 15, 2012 PREPARED TO ACCOMPANY DOEEA 1917 U.S....

188

Oil Independent Oakland Action Plan: Recommendations by the OIO...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force to the City of Oakland to Reduce its Dependence on Oil Speaker(s): James Lutz Date: March 21, 2008 -...

189

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S....

190

Climate Action Plan (South Dakota) | Open Energy Information  

Open Energy Info (EERE)

form History Share this page on Facebook icon Twitter icon Climate Action Plan (South Dakota) This is the approved revision of this page, as well as being the most...

191

Corrective Action Investigation Plan for Corrective Action Unit 500: Test Cell A Septic System, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s), and may include solid waste management units, individual disposal sites, or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP will be used in conjunction with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998c), hereafter referred to as the Leachfield Work Plan. Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. This CAIP contains CAU-specific information including a facility description, environmental sample collection objectives, and the criteria for conducting site investigation activities at CAU 500. This CAIP addresses one of three leachfield systems associated with Test Cell A, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (see Leachfield Work Plan Figure 1-1). Corrective Action Unit 500 is comprised of the Test Cell A Septic System (CAS 25-04-05) and the associated leachfield system presented in Figure 1-1 (FFACO, 1996).

IT Las Vegas

1999-01-27T23:59:59.000Z

192

US-China_Fact_Sheet_Efficiency_Action_Plan.pdf | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EfficiencyActionPlan.pdf US-ChinaFactSheetEfficiencyActionPlan.pdf US-ChinaFactSheetEfficiencyActionPlan.pdf More Documents & Publications US-ChinaFactSheetRenewable...

193

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II U.S.-Canada Clean Energy Dialogue (CED) Action Plan II Action Plan II describes initiatives that the U.S.-Canada Clean Energy...

194

South Africa-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » South Africa-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Argentina-Mitigation Action Plans and Scenarios (MAPS) Name Argentina-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country South Africa Southern Africa References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile

195

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

196

Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya

197

Groundwater Monitoring Guidance for the Industry Action Plan on Coal Combustion Product Management  

Science Conference Proceedings (OSTI)

The US Environmental Protection Agency (USEPA) is scheduled to release federal guidelines for management of coal combustion products (CCPs) in 2007. The utility industry has developed a voluntary Action Plan as an alternative to the federal guidelines. In either case, groundwater monitoring will be required. The purpose of this report is to provide guidance for implementing a groundwater-monitoring program at CCP management sites consistent with the Action Plan proposed by the utility industry.

2005-12-07T23:59:59.000Z

198

LEDSGP/Transportation Toolkit/Key Actions/Prioritize and Plan | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » LEDSGP/Transportation Toolkit/Key Actions/Prioritize and Plan < LEDSGP‎ | Transportation Toolkit‎ | Key Actions(Redirected from Transportation Toolkit/Key Actions/Prioritize and Plan) Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Contacts Key Actions for Low-Emission Development in Transportation Although no single approach or fixed process exists for low-emission development strategies (LEDS), the following key actions are necessary steps for implementing LEDS in the transportation sector. Undertaking these actions requires flexibility to adapt to dynamic societal conditions in a

199

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

200

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions | Open Energy  

Open Energy Info (EERE)

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Jump to: navigation, search Name Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Agency/Company /Organization Asian Development Bank Focus Area Transportation Topics Implementation, Policies/deployment programs, Background analysis Resource Type Guide/manual Website http://www.adb.org/documents/o Program Start 2002 Country Vietnam UN Region South-Eastern Asia References Vietnam-Integrated Action Plan to Reduce Vehicle Emissions[1] Background "A major goal of this strategy is to reduce mobile sources of air pollution in Viet Nam's largest cities. According to this strategy, industry, business units, management agencies and the transport sector must carefully control pollutant emissions such as carbon monoxide (CO), carbon dioxide

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

Science Conference Proceedings (OSTI)

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE /NV

2001-04-05T23:59:59.000Z

202

Climate Action Plan (New York) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (New York) Climate Action Plan (New York) Climate Action Plan (New York) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State New York Program Type Climate Policies Provider Department of Environmental Conservation In August of 2009 Governor David A. Paterson signed Executive Order No. 24 setting a goal to reduce greenhouse gas emissions in New York State by 80 percent below the levels emitted in 1990 by the year 2050. The Executive

203

Green Building Action Plan for State Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities < Back Eligibility State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State California Program Type Energy Standards for Public Buildings Provider California Energy Commission '''''Note: California voters approved [http://vig.cdn.sos.ca.gov/2012/general/pdf/text-proposed-laws-v2.pdf#nam... Ballot Proposition 39] in November 2012. The new law closes a tax loophole, which is expected to provide $1 billion in additional revenue every year.

204

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

David A. Strand

2004-10-01T23:59:59.000Z

205

A Temporal Description Logic for Reasoning about Actions and Plans  

E-Print Network (OSTI)

A class of interval-based temporal languages for uniformly representing and reasoning about actions and plans is presented. Actions are represented by describing what is true while the action itself is occurring, and plans are constructed by temporally relating actions and world states. The temporal languages are members of the family of Description Logics, which are characterized by high expressivity combined with good computational properties. The subsumption problem for a class of temporal Description Logics is investigated and sound and complete decision procedures are given. The basic language TL-F is considered #rst: it is the composition of a temporal logic TL # able to express interval temporal networks # together with the non-temporal logic F # a Feature Description Logic. It is proven that subsumption in this language is an NP-complete problem. Then it is shown how to reason with the more expressive languages TLU-FU and TL-ALCF . The former adds disjunction both at...

Alessandro Artale; Enrico Franconi

1998-01-01T23:59:59.000Z

206

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

207

Formally founded, plan-based enactment of software development processes  

Science Conference Proceedings (OSTI)

The management of a software development project is a demanding task. To plan and control the actions of the project participants, the existence of a suitable project plan is of critical importance. However, elaborating and maintaining such a project ... Keywords: controlling, enactment, formal model, project plans

Jan Friedrich; Klaus Bergner

2011-05-01T23:59:59.000Z

208

Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan Fact Sheet: United States-Japan Joint Nuclear Energy Action...

209

CLIMATE ACTION PLAN Executive Summary 1  

E-Print Network (OSTI)

Introduction 7 UIC's Carbon Footprint 9 GHG Emissions Mitigation Strategies 11 Strategy 1.0 Energy Efficiency of Biodegradable Packaging 37 5.4 Collecting and Converting Vegetable Oil 38 5.5 Develop a User-friendly Property

Illinois at Chicago, University of

210

Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

David A. Strand

2004-09-01T23:59:59.000Z

211

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. Collect samples of source material to determine the potential for a release. Collect samples of potential remediation wastes. Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Alfred Wickline

2009-04-01T23:59:59.000Z

212

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

DOE Green Energy (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

213

EMERGENCY ACTION PLAN SUMMARY IMPORTANT EMERGENCY PHONE NUMBERS  

E-Print Network (OSTI)

2009 EMERGENCY ACTION PLAN SUMMARY IMPORTANT EMERGENCY PHONE NUMBERS: UGA Police: (706) 542-2200 or 911 Emergency line (706) 542-1188 (TTY Hearing Impaired) The University of Georgia Police Department is the primary contact for all campus emergencies. Calls will be routed to the appropriate campus and local

Arnold, Jonathan

214

us_national_action_plan_final_2.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 20, 2011 SEPTEMBER 20, 2011 THE OPEN GOVERNMENT PARTNERSHIP NATIONAL ACTION PLAN FOR THE UNITED STATES OF AMERICA U.S. National ACTION PLAN INTRODUCTION Since the first day of his Administration, President Barack Obama has made Open Government a high priority. The Memorandum on Transparency and Open Government was the first executive action to bear the President's signature, and the President has pledged his Administration to work toward "an unprecedented level of openness in Government." Over the past two and a half years, Federal agencies have done a great deal to make government more transparent and more accessible, to provide people with information that they can use in their daily lives, to solicit public participation in government decision-making, and to collaborate with all sectors of the economy on new and innovative solutions.

215

Root Cause Analysis (RCA) & Corrective Action Plan (CAP) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

prior to project approval, additional funding authorization, and project execution. Corrective Measure 2 Develop and implement a comprehensive staffing plan, with an...

216

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

SciTech Connect

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

217

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

Science Conference Proceedings (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

218

Office of River Protection Integrated Safety Management System Phase 1 Verification Corrective Action Plan  

SciTech Connect

The purpose of this Corrective Action Plan is to demonstrate the OW planned and/or completed actions to implement ISMS as well as prepare for the RPP ISMS Phase II Verification scheduled for August, 1999. This Plan collates implied or explicit ORP actions identified in several key ISMS documents and aligns those actions and responsibilities perceived necessary to appropriately disposition all ISM Phase II preparation activities specific to the ORP. The objective will be to complete or disposition the corrective actions prior to the commencement of the ISMS Phase II Verification. Improvement products/tasks not slated for completion prior to the RPP Phase II verification will be incorporated as corrective actions into the Strategic System Execution Plan (SSEP) Gap Analysis. Many of the business and management systems that were reviewed in the ISMS Phase I verification are being modified to support the ORP transition and are being assessed through the SSEP. The actions and processes identified in the SSEP will support the development of the ORP and continued ISMS implementation as committed to be complete by end of FY-2000.

CLARK, D.L.

1999-08-09T23:59:59.000Z

219

Climate Action Planning: A Review of Best Practices, Key Elements, and  

Open Energy Info (EERE)

Planning: A Review of Best Practices, Key Elements, and Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment Jump to: navigation, search Name Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment Agency/Company /Organization Eastern Research Group Inc. Partner U.S. Environmental Protection Agency Sector Energy Focus Area Greenhouse Gas Phase Bring the Right People Together, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Resource Type Lessons learned/best practices Availability Publicly available; free

220

Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0  

DOE Green Energy (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-08T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Microsoft Word - Final Mitigated Action Plan - CNMI.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

| P | P a g e MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT FOR THE GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Golden Service Center Office of Energy Efficiency and Renewable Energy DOE/EA-1923 2 | P a g e ACRONYMS AND ABBREVIATIONS AMC Adaptive Management Committee CFR Code of Federal Regulations DOE U.S. Department of Energy EA environmental assessment ESA Endangered Species Act FONSI finding of no significant impacts MAP mitigation action plan NEPA National Environmental Policy Act USFWS U.S. Fish and Wildlife Service 3 | P a g e 1.0 Introduction The United States Department of Energy (DOE) has issued a Final Environmental Assessment (EA) and a

222

Climate Action Plan (New Orleans) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orleans) Orleans) Climate Action Plan (New Orleans) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Louisiana Program Type Climate Policies Provider New Orleans Environmental Affairs New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its

223

An Empirical Analysis of Some Heuristic Features for Planning through Local Search and Action Graphs  

Science Conference Proceedings (OSTI)

Planning through local search and action graphs is a powerful approach to fully-automated planning which is implemented in the well-known LPG planner. The approach is based on a stochastic local search procedure exploring a space of partial plans and ... Keywords: Automated planning, domain-independent planning, efficient planning, experimental evaluation of planning techniques

Alfonso Gerevini; Alessandro Saetti; Ivan Serina

2011-04-01T23:59:59.000Z

224

MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT, NOTICE OF WETLAND INVOLVEMENT, AND FINDING OF NO SIGNIFICANT IMPACT FOR THE CONSTRUCTION AND OPERATION OF A LIGNOCELLULOSIC U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 1.0 Introd uction 1 1.1 Purpose of the Mitigation Action Plan 1 1.2 Structure of the Mitigation Action Plan 2 2.0 Ambient Ai r Quality 3 2.1 Potential Impacts 3 2.2 Mitigation Measures 3 2.3 Metrics for Determining Success or Failure of the Mitigation Measures 4 2.4 Monitoring Techniques for Mitigation Measures 4 3.0 Truck Traffic 4 3.1 Potential Impacts 4 3.2 Mitigation Measures 4 3.3 Metrics for Determining Success or Failure of the Mitigation Measures 5 3.4 Monitoring Techniques for Mitigation Measures 5 4.0 Genetically Modified Yeasts 6 4.1 Potential Impacts 6 4.2 Mitigation Measures 6 4.3 Metrics for Determining

225

A Temporal Description Logic for Reasoning about Actions and Plans  

E-Print Network (OSTI)

A class of interval-based temporal languages for uniformly representing and reasoning about actions and plans is presented. Actions are represented by describing what is true while the action itself is occurring, and plans are constructed by temporally relating actions and world states. The temporal languages are members of the family of Description Logics, which are characterized by high expressivity combined with good computational properties. The subsumption problem for a class of temporal Description Logics is investigated and sound and complete decision procedures are given. The basic language TL-F is considered first: it is the composition of a temporal logic TL -- able to express interval temporal networks -- together with the non-temporal logic F -- a Feature Description Logic. It is proven that subsumption in this language is an NP-complete problem. Then it is shown how to reason with the more expressive languages TLU-FU and TL-ALCF. The former adds disjunction both at the temporal and non-temporal s...

Artale, A; 10.1613/jair.516

2011-01-01T23:59:59.000Z

226

Root Cause Analysis (RCA) & Corrective Action Plan (CAP) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Root Cause Analysis Root Cause Analysis (RCA) & Corrective Action Plan (CAP) Root Cause Analysis (RCA) & Corrective Action Plan (CAP) Improving the Department of Energy's project and contract management continues to be one of the Department's management priorities. Excellence in this area helps ensure that DOE's programs and projects meet DOE's strategic objectives, provide value to the American taxpayer, and foster public confidence in DOE's ability to manage its responsibilities. As part of our effort to build a strong project and contract management foundation, a root cause analysis (RCA) was developed through extensive collaboration between DOE's Headquarters and field project, contract, and financial management professionals, and in coordination with the Office of

227

Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

DOE /NV Operations Office

1999-05-01T23:59:59.000Z

228

Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

DOE /NV

1999-01-25T23:59:59.000Z

229

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

U.S. Department of Energy, Nevada Operations Office

1999-05-05T23:59:59.000Z

230

U.S.-Canada Clean Energy Dialogue (CED) Action Plan | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S.-Canada Clean Energy Dialogue (CED) Action Plan U.S.-Canada Clean Energy Dialogue (CED) Action Plan First Report of the U.S.-Canada Clean Energy Dialogue Working Groups...

231

U.S.-Brazil Binational Joint Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Energy Working Group, formed on July 20, 2010, when DOE and the Brazilian...

232

FACT SHEET: U.S.-China Energy Efficiency Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: U.S.-China Energy Efficiency Action Plan FACT SHEET: U.S.-China Energy Efficiency Action Plan Today, President Barack Obama and President Hu Jintao announced the launch...

233

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II U.S.-Canada Clean Energy Dialogue (CED) Action Plan II The U.S. Department of Energy (DOE) and Environment Canada released...

234

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

David A. Strand

2004-06-01T23:59:59.000Z

235

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

Robert F. Boehlecke

2004-06-01T23:59:59.000Z

236

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013  

Energy.gov (U.S. Department of Energy (DOE))

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

237

Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

NSTec Environmental Restoration

2011-04-30T23:59:59.000Z

238

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

239

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

240

Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action alternatives.

Wickline, Alfred

2005-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Corrective Action Investigation Plan for Corrective Action Unit 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit (CAU) 567 is located in Areas 1, 3, 5, 20, and 25 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 567 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 567, which comprises the following corrective action sites (CASs): 01-23-03, Atmospheric Test Site T-1 03-23-25, Seaweed E Contamination Area 05-23-07, A5b RMA 20-23-08, Colby Mud Spill 25-23-23, J-11 Soil RMA These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on May 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 567. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 567 releases are nuclear test operations and other NNSS operations. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary at Atmospheric Test Site T-1 exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default contamination boundary at Atmospheric Test Site T-1 and all other CAU 567 CASs will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based FAL. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Matthews, Patrick K.

2013-07-01T23:59:59.000Z

242

Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

Bechtel Nevada

1998-09-30T23:59:59.000Z

243

Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This Corrective Action Investigation has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Wickline, Alfred; McCall, Robert

2006-08-01T23:59:59.000Z

244

Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This Corrective Action Investigation has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Wickline, Alfred; McCall, Robert

2006-08-01T23:59:59.000Z

245

Microsoft Word - Mitigation Action Plan master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

246

NE-24 Unlverslty of Chicayo Remedial Action Plan  

Office of Legacy Management (LM)

(YJ 4 tlsj .?I2 (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the data needed for certiff- cation of the cleanup and any contamination left In place, e.g., sewer lines should be so documented in the permanent records of the University as well as the certification documents and reports. The remedial action to be conducted appears to be clearly InsIgnifIcant from an environmental

247

An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS  

Office of Legacy Management (LM)

I&s ' c I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over low-level radioactive contamination of private lands or former ERDA (AEC) lands released to the public, the undeveloped part of the former main tech- nical area of LASL (TA-1) was surveyed in 1974 at the request of ERDA @EC)*. This effort was to determine whether any of the land (%40

248

Microsoft Word - Bots Plan of Action.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V.1 V.1 11/25/2009 U.S. DEPARTMENT OF ENERGY CYBER SECURITY AWARENESS & TRAINING Spiders, Crawlers and Bots Campaign Plan of Action Office of the Chief Information Officer DRAFT V.1 11/25/2009 1 Version Date Author Change Description 1.0 May 23, 2008 Lisa Taylor Submitted to Client DRAFT V.1 11/25/2009 2 1) PLAN FOR SPIDERS, CRAWLERS AND BOTS CAMPAIGN This document defines a cyber security awareness campaign in DOE Headquarters specifically on Spiders, Crawlers and Bots. The campaign includes displays, distribution of literature and promotional items, and a variety of activities during the months of July, August and September 2008. Reference materials and promotional items will be disseminated during this time to employees and contractors within DOE facilities.

249

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

Vollmer, A.T.

1993-10-01T23:59:59.000Z

250

Climate Action Plan (Rhode Island) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island) Rhode Island) Climate Action Plan (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Climate Policies Provider Department of Environmental Management In the fall of 2001, the Department of Environmental Management (DEM), the

251

Climate Action Plan (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Carolina) South Carolina) Climate Action Plan (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Climate Policies Provider Environmental Policy Advisor Governor Sanford issued Executive Order 2007-04 on February 16, 2007,

252

Uranium Mill Tailings Remedial Action Project environmental protection implementation plan  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

Not Available

1994-10-01T23:59:59.000Z

253

Climate Action Plan (New Mexico) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mexico) Mexico) Climate Action Plan (New Mexico) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Mexico Program Type Climate Policies Provider New Mexico Environment Department Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in the

254

Environmental Development Plan (EDP). Geothermal energy systems, 1977  

DOE Green Energy (OSTI)

The Geothermal Energy Systems Environmental Development Plan (EDP) identifies the environmental, health, safety, social, and economic issues which are associated with the development, demonstration, and commercialization of geothermal resources and conversion technology. The EDP also describes the actions and implementation strategy required to resolve the issues identified. These actions may include the initiation of R and D activities, operations monitoring, baseline characterization studies, or activities leading to the development of standards and criteria in concert with other responsible agencies.

Not Available

1978-03-01T23:59:59.000Z

255

Corrective Action Investigation Plan for Corrective Action Unit 555: Septic Systems Nevada Test Site, Nevada, Rev. No.: 0 with Errata  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 555: Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 555 is located in Areas 1, 3 and 6 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada, and is comprised of the five corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-59-01, Area 1 Camp Septic System; (2) CAS 03-59-03, Core Handling Building Septic System; (3) CAS 06-20-05, Birdwell Dry Well; (4) CAS 06-59-01, Birdwell Septic System; and (5) CAS 06-59-02, National Cementers Septic System. An FFACO modification was approved on December 14, 2005, to include CAS 06-20-05, Birdwell Dry Well, as part of the scope of CAU 555. The work scope was expanded in this document to include the investigation of CAS 06-20-05. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 555 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before the evaluation and selection of corrective action alternatives.

Pastor, Laura

2005-12-01T23:59:59.000Z

256

Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

T. M. Fitzmaurice

2000-05-01T23:59:59.000Z

257

Corrective Action Investigation Plan for Corrective Action Unit 542: Disposal Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

Corrective Action Unit (CAU) 542 is located in Areas 3, 8, 9, and 20 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 542 is comprised of eight corrective action sites (CASs): (1) 03-20-07, ''UD-3a Disposal Hole''; (2) 03-20-09, ''UD-3b Disposal Hole''; (3) 03-20-10, ''UD-3c Disposal Hole''; (4) 03-20-11, ''UD-3d Disposal Hole''; (5) 06-20-03, ''UD-6 and UD-6s Disposal Holes''; (6) 08-20-01, ''U-8d PS No.1A Injection Well Surface Release''; (7) 09-20-03, ''U-9itsy30 PS No.1A Injection Well Surface Release''; and (8) 20-20-02, ''U-20av PS No.1A Injection Well Surface Release''. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 30, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 542. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 542 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Conduct geophysical surveys to locate previously unidentified features at CASs 03-20-07, 03-20-09, 03-20-10, 03-20-11, and 06-20-03. (4) Perform field screening. (5) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present. (6) Collect quality control samples for laboratory analyses to evaluate the performance of measurement systems and controls based on the requirements of the data quality indicators. (7) If COCs are present at the surface/near surface (< 15 feet below ground surface), collect additional step-out samples to define the extent of the contamination. (8) If COCs are present in the subsurface (i.e., base of disposal hole), collect additional samples to define the vertical extent of contamination. A conservative use restriction will be used to encompass the lateral extent of subsurface contamination. (9) Stake or flag sample locations in the field, and record coordinates through global positioning systems surveying. (10) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Laura Pastor

2006-05-01T23:59:59.000Z

258

Uranium Mill Tailings Remedial Action Project (UMTRAP) Public Participation Plan  

SciTech Connect

The purpose of this Public Participation Plan is to explain the Department of Energy`s plan for involving the public in the decision-making process related to the Uranium Mill Tailings Remedial Action (UMTRA) Project. This project was authorized by Congress in the Uranium Mill Tailings Radiation Control Act of 1978. The Act provides for a cooperative effort with affected states and Indian tribes for the eventual cleanup of abandoned or inactive uranium mill tailings sites, which are located in nine western states and in Pennsylvania. Section 111 of the Act states, ``in carrying out the provisions of this title, including the designation of processing sites, establishing priorities for such sites, the selection of remedial actions and the execution of cooperative agreements, the Secretary (of Energy), the Administrator (of the Environmental Protection Agency), and the (Nuclear Regulatory) Commission shall encourage public participation and, where appropriate, the Secretary shall hold public hearings relative to such matters in the States where processing sites and disposal sites are located.`` The objective of this document is to show when, where, and how the public will be involved in this project.

NONE

1981-05-01T23:59:59.000Z

259

FTCP FY09 Operational Plan GOAL 2 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Technical Capability Program Federal Technical Capability Program FY 2009 Operational Plan Preserve and Enhance Technical Capability Action Plan F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 0 0 9 9 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N GOAL 2: Preserve and Enhance Technical Capability * Champions: Dave Chaney, NNSA Service Center and Larry Kelly, Oak Ridge Office Objectives/Actions Identify Resource and Organizational Structure Needs to Improve Qualification Consistency and Transportability * Champion: Allen Tate, SSO * Determine appropriate resource levels * Determine effective organizational structure Establish an Effective Mid-Level Recruitment Program * Champions:Sean Clayton, HQ HC-13 and Barry Weaver, ETS * Benchmark existing programs

260

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: #2; CAS 03-04-02, Area 3 Subdock Septic Tank #2; CAS 03-59-05, Area 3 Subdock Cesspool #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks #2; CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. #2; CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. #2; CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. #2; CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. #2; CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

NSTec Environmental Restoration

2009-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

INDIVIDUAL DEVELOPMENT PLAN JOB AID  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDIVIDUAL DEVELOPMENT PLAN JOB AID INDIVIDUAL DEVELOPMENT PLAN JOB AID Log into to ESS>Click the IDP drop down menu>Click Start Page Click on "Create a new IDP" NOTE: This screen also gives you the option to change supervisors, view, update and rollover your IDP. Your initial IDP will be (blank) in the goal column for your 3 Short Range and Long Range goals, so click on the word/link (Modify) to enter goals. Enter your Goal in the box below>Click Save This window will appear>Click on one of the Activity boxes below to enter an activity. You can add more than one activity per goal. This window will appear so you can enter the detailed information for your activities. You can select one of the 3 save options on the bottom. To View your IDP>Click on View current IDP (example is below this screen

262

G20 Anti-Corruption Action Plan Action Point 7: Protection of Whistleblowers  

E-Print Network (OSTI)

whistleblowers as one of the high priority areas in their global anticorruption agenda. Recognizing the importance of effective whistleblower protection laws, Leaders, in point 7 of the G20 Anti-Corruption Action Plan, called on G20 countries to lead by: To protect from discriminatory and retaliatory actions whistleblowers who report in good faith suspected acts of corruption, G-20 countries will enact and implement whistleblower protection rules by the end of 2012. To that end, building upon the existing work of organisations such as the OECD and the World Bank, G-20 experts will study and summarise existing whistleblower protection legislation and enforcement mechanisms, and propose best practices on whistleblower protection legislation. The G20 Anti-Corruption Working Group (AWG), in charge of carrying out the Action Plan assigned the OECD the task of preparing a concept note with proposals to implement this point. Following a discussion of the concept note at their meeting on 25-26 February 2010 in Paris, the G20 Members reiterated the value of a study of the main features of whistleblower protection frameworks currently in place in G20 countries, together with guiding principles and best

unknown authors

2010-01-01T23:59:59.000Z

263

Strategic Petroleum Reserve: Facilities development project plan  

SciTech Connect

While the Strategic Petroleum Reserve (SPR) project is subject to future Administration policy decisions, budget proposals and Congressional actions, this Project Plan sets forth a feasible technical, cost, and schedule plan associated with the development of 750 million barrels of SPR crude oil storage and for enhancement of the SPR's distribution system to achieve a distribution capability of 4.5 million barrels per day. Assuming future adoption by the Administration and Congress of the project schedule identified in this Project Plan, The Total Project Cost (TPC) in program year dollars is $2,500,000,000. The TPC excludes post-development operations, capital improvement projects, terminal standby services, and oil acquisition. Under the same assumption, the schedule objectives of this project are: completion of the 750-million-barrel reserve, excluding oil fill, by September 30, 1992 in accordance with the storage capacity development schedule presented in Attachment 1. Completion of distribution enhancements to provide a distribution capability of 4.5 million barrels per day by September 30, 1992 in accordance with the following schedule: 3.0 million barrels per day by July 31, 1987; 3.5 million barrels per day by September 30, 1989; and 4.5 million barrels per day by September 30, 1992.

1986-10-01T23:59:59.000Z

264

Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). Corrective Action Unit 309 is located in Area 12 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 mi beyond the main gate to the NTS. Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: CAS 12-06-09, Muckpile; CAS 12-08-02, Contaminated Waste Dump (CWD); and CAS 12-28-01, I, J, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J-and K-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and media sampling, where appropriate. Data will also be obtained to support waste management decisions. The CASs in CAU 309 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and/or the environment. Existing information on the nature and extent of potential contamination at these sites are insufficient to evaluate and recommend corrective action alternatives for the CASs. Therefore, additional information will be obtained by conducting a CAI prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS.

David A. Strand

2004-12-01T23:59:59.000Z

265

Corrective Action Investigation Plan for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Rev. 0, Including Record of Technical Change No. 1  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 529, Area 25 Contaminated Materials, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. CAU 529 consists of one Corrective Action Site (25-23-17). For the purpose of this investigation, the Corrective Action Site has been divided into nine parcels based on the separate and distinct releases. A conceptual site model was developed for each parcel to address the translocation of contaminants from each release. The results of this investigation will be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-02-26T23:59:59.000Z

266

North Slope (Wahluke Slope) expedited response action cleanup plan  

SciTech Connect

The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

Not Available

1994-02-01T23:59:59.000Z

267

Corrective Action Investigation Plan for Corrective Action Unit 447: Project Shoal Area, Nevada Subsurface Site  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) describes the US Department of Energy's (DOE's) continued environmental investigation of the subsurface Project Shoal Area (PSA) Corrective Action Unit (CAU) 447. The PSA is located in the Sand Springs Mountains in Churchill County, Nevada, about 48 kilometers (km) (30 miles [mi]) southeast of Fallon, Nevada. Project Shoal was part of the Vela Uniform Program which was conducted to improve the US' ability to detect, identify, and locate underground nuclear detonations. The test consisted of detonating a 12-kiloton nuclear device deep underground in granitic rock to determine whether seismic waves produced by an underground nuclear test could be differentiated from seismic waves produced by a naturally occurring earthquake. The test was a joint effort conducted by the US Atomic Energy Commission (AEC) and the US Department of Defense (DoD) in October 1963 (AEC, 1964).

DOE /NV

1998-11-01T23:59:59.000Z

268

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada  

Office of Legacy Management (LM)

Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062

269

The Removal Action Work Plan for CPP-603A Basin Facility  

SciTech Connect

This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center.

B. T. Richards

2006-06-05T23:59:59.000Z

270

2006 long range development plan  

NLE Websites -- All DOE Office Websites (Extended Search)

draft draft university of california berkeley lab  Draft 2-5-06 1 2 3 background the plan the vision laboratory location 10 berkeley laboratory historical perspective 14 berkeley lab 2006 20 Facilities conditions 24 the scientific vision for berkeley lab 30 space and population projections 34 the site and Facilities vision 38 introduction to the plan 44 land use 46 development Framework 56 vehicle access, circulation, and parking 62 pedestrian circulation 70 open space and landscape 74 utilities and infrastructure 82 introduction director's ForeWord contents 2 4 appendices appendix a: Main site building inventory 88 appendix b: land leases 94 appendix c: Figures and tables 96 appendix d: related documents 99 appendix e: abbreviations and definitions 100 appendix F: berkeley lab organization 102

271

The greening of the White House. Phase 1 action plan  

SciTech Connect

This describes a comprehensive, multi-year project designed to improve energy efficiency and cut waste throughout the White House. The project highlights practical steps that homeowners and business people can take to benefit the environment, save money, and improve the comfort of their surroundings. At America`s symbolic home, the effort will showcase the best new American products, environmental technologies, that are good investments for the pocketbook and for the planet. Investing in energy efficiency and pollution prevention saves taxpayers money on electricity, materials, and waste disposal, and drives markets for the technologies of the future. These technologies provide the foundation for some of the nation`s highest priority environmental programs, including the President`s Climate Change Action Plan and the Administration`s pollution prevention efforts.

1994-03-11T23:59:59.000Z

272

President Obama presents new Climate Action Plan | OpenEI Community  

Open Energy Info (EERE)

President Obama presents new Climate Action Plan President Obama presents new Climate Action Plan Home > Blogs > Graham7781's blog Graham7781's picture Submitted by Graham7781(1992) Super contributor 27 June, 2013 - 12:39 Climate Action Plan obama OpenEI President President Obama layed out his much anticipated Climate Action Plan tuesday. The President's plan calls for major actions that the administration believes will mitigate the environmental and economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels The President stressed the need for higher standards on carbon emissions. The plan will call on the Environmental Protection Agency to work up carbon pollution standards, as well as the Department of Energy to receive up to $8 billion in loan guarantees for a wide array of advanced fossil fuel

273

Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan The United States-Japan Joint Nuclear Energy Action Plan is intended to provide a framework for bilateral collaboration in nuclear energy. This Action Plan builds upon our significant, longstanding civilian nuclear cooperation, and will contribute to increasing energy security and managing nuclear waste, addressing nuclear nonproliferation and climate change, advancing goals put forth in President Bush's Global Nuclear Energy Partnership (GNEP) initiative. The Action Plan was signed by representatives of both nations in April 2007. The Action Plan will be implemented by Steering Committee Co-Chairs. Assistant Secretary of Energy Dennis Spurgeon, or his designee, will serve as the U.S. Co-Chair. Japanese Co-Chairs will be selected

274

Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0  

Science Conference Proceedings (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2005-01-01T23:59:59.000Z

275

Japan-Action Plan for Achieving a Low-Carbon Society | Open Energy  

Open Energy Info (EERE)

Japan-Action Plan for Achieving a Low-Carbon Society Japan-Action Plan for Achieving a Low-Carbon Society Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Japan-Action Plan for Achieving a Low-Carbon Society Agency/Company /Organization: Government of Japan Sector: Energy, Land Topics: Low emission development planning, Pathways analysis, Background analysis Resource Type: Publications, Case studies/examples Website: www.kantei.go.jp/foreign/policy/ondanka/final080729.pdf Country: Japan UN Region: Eastern Asia Coordinates: 36.204824°, 138.252924° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.204824,"lon":138.252924,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

276

Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a).

DOE /NV

1999-01-28T23:59:59.000Z

277

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: 25-23-22, Contaminated Soils Site 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

Patrick Matthews

2010-03-01T23:59:59.000Z

278

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada  

SciTech Connect

This CAIP presents a plan to investigate the nature and extent of the contaminants of potential concern (COPCs) at CAU 135. The purpose of the corrective action investigation described in this CAIP is to: (1) Identify the presence and nature of COPCs; (2) Determine the location of radiological contamination within the vault and determine the extent of COPCs in the sump area and on the floor; and (3) Provide sufficient information and data to develop and evaluate appropriate corrective actions for CAS 25-02-01. This CAIP was developed using the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQOs) (EPA, 1994) process to clearly define the goals for collecting environmental data, to determine data uses, and to design a data collection program that will satisfy these uses. A DQO scoping meeting was held prior to preparation of this plan; a brief summary of the DQOs is presented in Section 3.4. A more detailed summary of the DQO process and results is included in Appendix A.

DOE /NV

1999-05-01T23:59:59.000Z

279

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II  

Energy.gov (U.S. Department of Energy (DOE))

Action Plan II describes initiatives that the U.S.-Canada Clean Energy Dialogue Working Groups plan to implement under Phase II of the CED to further progress toward a low-carbon economy that...

280

DOE/EIS-0397: Mitigation Action Plan for the Lyle Falls Fish...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN Lyle Falls Fish Passage Project Bonneville Power Administration Confederated Tribes and Bands of the Yakama Nation Washington Department of Fish and...

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

Patrick Matthews

2010-03-01T23:59:59.000Z

282

1994 Site Development Plan: A plan with vision  

SciTech Connect

The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

1994-07-01T23:59:59.000Z

283

ERRATA SHEET for Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada  

SciTech Connect

Section 2.1.1.3 of the Table of Contents reference on Page v and on Page 12 of the Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada erroneously refers to the Nevada Environmental Policy Act Determination. The correct title of the referenced document is the National Environmental Policy Act Determination.

K. B. Campbell

2002-04-01T23:59:59.000Z

284

Corrective Action Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect

The purpose of this Corrective Action Plan is to provide the strategy and methodology to close the Area 25 Vehicle Washdown. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was performed during March 1999 at each CAS. Soil samples were collected at each CAS using a direct-push method. Soil samples were collected from the surface to depths of up to 2.7 m (9 ft) below ground surface. In addition, the gravel sump at CAS 25-07-02 (F and J Roads Pad) was sampled using a backhoe. Soil samples were collected from depths of 0 to 0.6 m (0 to 2 ft) below the gravel layer in the sump.

D. S. Tobiason

2000-05-01T23:59:59.000Z

285

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: 4/09/09 6: 4/09/09 Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE-recognized expert. (Dave Chaney) Action 6: Develop white paper on approach to institutionalize "DOE/NNSA Recognized Expert" BACKGROUND: The benchmarking of other agencies indicates that "Recognized Experts" may be used in a training environment as Subject Matter Experts, but that industry and regulators generally rely on educational degrees from accredited universities, internal corporate/agency qualification and certification programs or Professional Engineer (PE)/ Independent Body Certifications and experience for operational/maintenance/functional expertise, without having a

286

Geothermal development plan: Yuma County  

DOE Green Energy (OSTI)

The Yuma County Area Development Plan evaluated the county-wide market potential for utilizing geothermal energy. The study identified four potential geothermal resource areas with temperatures less than 90/sup 0/C (194/sup 0/F), and in addition, two areas are inferred to contain geothermal resources with intermediate (90/sup 0/C to 150/sup 0/C, 194/sup 0/F to 300/sup 0/F) temperature potential. The resource areas are isolated, although one resource area is located near Yuma, Arizona. One resource site is inferred to contain a hot dry rock resource. Anticipated population growth in the county is expected to be 2 percent per year over the next 40 years. The primary employment sector is agriculture, though some light industry is located in the county. Water supplies are found to be adequate to support future growth without advese affect on agriculture. Six firms were found in Yuma County which may be able to utilize geothermal energy for process heat needs. In addition, several agricultural processors were found, concentrated in citrus processing and livestock raising. Geothermal energy utilization projections suggest that by the year 2000, geothermal energy may economically provide the energy equivalent of 53,000 barrels of oil per year to the industrial sector if developed privately. Geothermal utilization projections increase to 132,000 barrels of oil per year by 2000 if a municipal utility developed the resource.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

287

Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: 11-23-05, Pin Stripe Contamination Area 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. Collect and submit environmental samples for laboratory analysis to determine internal dose rates. Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. If contamination exceeds FALs, define the extent of the contamination exceeding FALs. Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Patrick Matthews

2009-02-01T23:59:59.000Z

288

Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

Not Available

1984-07-01T23:59:59.000Z

289

Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).

K. B. Campbell

2002-06-01T23:59:59.000Z

290

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

NSTec Environmental Restoration

2007-04-01T23:59:59.000Z

291

United States and Japan Sign Joint Nuclear Energy Action Plan to Promote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation April 25, 2007 - 12:36pm Addthis WASHINGTON, DC - United States Department of Energy Secretary Samuel W. Bodman and Japan's Ministers Akira Amari, Bunmei Ibuki, and Taro Aso, this week presented to U.S. President George W. Bush and Japanese Prime Minister Shinzo Abe, the United States-Japan Joint Nuclear Energy Action Plan. The Action Plan - a product of extensive negotiations between the U.S. and Japan - provides a framework for increased collaboration in nuclear energy. It builds upon the significant, longstanding civilian nuclear cooperation between the two nations and will contribute to increasing

292

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

293

A Low Carbon Development Guide for Local Government Actions in China  

SciTech Connect

Local level actions are crucial for achieving energy-saving and greenhouse gas emission reduction targets. Yet it is challenging to implement new policies and actions due to a lack of information, funding, and capacity. This is particularly the case in developing countries such as China. Even though national energy intensity and carbon intensity targets have been set, most local governments do not have the knowledge regarding actions to achieve the targets, the cost-effectiveness of policies, the possible impact of policies, or how to design and implement a climate action plan. This paper describes a guidebook that was developed to motivate and provide local governments in China with information to create an action plan to tackle climate change and increase energy efficiency. It provides a simple step-by-step description of how action plans can be established and essential elements to be included - from preparing a GHG emission inventory to implementation of the plan. The guidebook also provides a comprehensive list of successful policies and best practices found internationally and in China to encourage low carbon development in industry, buildings, transportation, electric power generation, agriculture and forestry. This paper also presents indicators that can be used to define low-carbon development, as well as to evaluate the effectiveness of actions taken at an aggregated (city) level, and at a sectoral or end use level. The guidebook can also be used for low carbon development by local governments in other developing countries.

Zheng, Nina; Zhou, Nan; Price, Lynn; Ohshita, Stephanie

2011-05-01T23:59:59.000Z

294

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. 0 with ROTC No. 1 and ROTC No. 2  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to CAS 23-02-08. The scope of the corrective action investigation for CAU 554 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Perform field screening. (3) Collect and submit environmental samples for laboratory analysis to determine if contaminants of concern are present. (4) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (5) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Robert F. Boehlecke

2004-10-01T23:59:59.000Z

295

Geothermal development plan: Pinal County  

SciTech Connect

The Pinal County Area Development Plan evaluated the county-wide market potential for utilizing geothermal energy. The study identified three suspected geothermal resource areas with potential 70/sup 0/C (158/sup 0/F) temperatures. In addition, one geothermal test well near Coolidge encountered bottom hole temperatures of 120/sup 0/C (248/sup 0/F) at a depth of 2440 m (8005 ft) and produced 18.3 l/sec (290 gpm). Geothermal resources are found to occur near population centers where average growth rates of 1.5% to 2% per year are expected over the next 40 years. Mining, agriculture and manufacturing are all important sectors of the regional economy and provide opportunities for direct utilization of geothermal energy. A regional energy use analysis includes energy use projections and regional energy price information. Agriculture accounts for 95% of the annual water consumption and predicted decreases in water availability will result in less future agricultural activity. The analysis contains a detailed section matching geothermal resources to potential industrial users. Fourteen firms in 10 industrial classes were identified as having some potential for geothermal energy use. In addition, 25 agricultural firms were identified as having some potential for geothermal use, including the prepared feeds industry.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

296

Geothermal development plan: Maricopa County  

DOE Green Energy (OSTI)

The Maricopa County Geothermal Development Plan evaluated the market potential for utilizing geothermal energy. The study identified six potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F) and in addition, four suspected intermediate temperature areas (90{sup 0} to 150{sup 0}C, 194{sup 0} to 300{sup 0}F). Geothermal resources are found to occur in and near the Phoenix metropolitan area where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing, trade and service sectors of the regional economy provides opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate to support this growth, though agricultural water use is expected to diminish. The study also contains a detailed section matching geothermal resources to potential users. Two comparative analyses providing economic details for space heating projects are incorporated.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

297

Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 31, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 550. The potential contamination sources associated with the study groups are from nuclear testing activities conducted at CAU 550. The DQO process resulted in an assumption that the total effective dose (TED) within the default contamination boundary of CAU 550 exceeds the final action level and requires corrective action. The presence and nature of contamination outside the default contamination boundary at CAU 550 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based final action level. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each group of CASs.

Grant Evenson

2012-05-01T23:59:59.000Z

298

Provincial Electricity Authority Privatization implementation program. Corporate planning (CP) study. Appendix B: Action plans, FY 1995/1996. Final report. Export trade information  

Science Conference Proceedings (OSTI)

This study, conducted by Southern Electric International, was funded by the U.S. Trade and Development Agency. The report assesses the operational efficiency of the Provincial Electricity Authority in Bangkok, Thailand. Volume 4 is composed of Appendix (b) Action Plans, FY 1995/1996.

NONE

1997-08-18T23:59:59.000Z

299

Corrective Action Investigation Plan for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) for Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 309 is comprised of the following three corrective action sites (CASs) in Area 12 of the NTS: (1) CAS 12-06-09, Muckpile; (2) CAS 12-08-02, Contaminated Waste Dump (CWD); and (3) CAS 12-28-01, I-, J-, and K-Tunnel Debris. Corrective Action Site 12-06-09 consists of a muckpile and debris located on the hillside in front of the I-, J-, and K-Tunnels on the eastern slopes of Rainier Mesa in Area 12. The muckpile includes mining debris (muck) and debris generated during the excavation and construction of the I-, J-, and K-Tunnels. Corrective Action Site 12-08-02, CWD, consists of a muckpile and debris and is located on the hillside in front of the re-entry tunnel for K-Tunnel. For the purpose of this investigation CAS 12-28-01 is defined as debris ejected by containment failures during the Des Moines and Platte Tests and the associated contamination that is not covered in the two muckpile CASs. This site consists of debris scattered south of the I-, J-, and K-Tunnel muckpiles and extends down the hillside, across the valley, and onto the adjacent hillside to the south. In addition, the site will cover the potential contamination associated with ''ventings'' along the fault, fractures, and various boreholes on the mesa top and face. One conceptual site model was developed for all three CASs to address possible contamination migration pathways associated with CAU 309. The data quality objective (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQO process addresses the primary problem that sufficient information is not available to determine the appropriate corrective action for the CAU. Due to the practical constraints posed by steep slopes on and around the CAU 309 muckpiles, a conservative, simplifying strategy was developed to resolve the presence and nature of contaminants. This strategy includes the use of historical data from similar sites (i.e., previously investigated NTS muckpiles) and the collection of samples from accessible areas of the muckpiles. Based on site history, process knowledge, and previous investigations of similar sites, contaminants of potential concern for CAU 309 collectively include radionuclides, total petroleum hydrocarbons (diesel range only), polychlorinated biphenyls, ''Resource Conservation and Recovery Act'' metals, volatile organic compounds, and semivolatile organic compounds.

Robert F. Boehlecke

2004-12-01T23:59:59.000Z

300

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE- recognized expert. (Chaney) Action Ref document Responsible Individual Interim milestones End date (projected) Status / Comments 1) Identify new sub-team leader * None Sohn/Boardman None 11/15/2008 Complete 2) Draft Attributes, Responsibilities and Qualification methods for current DOE/NNSA Experts * TPCDP * NNSA Safety Basis Professional Program * NNSA Safety and Security Professionals of the Year Chaney Propose to Competency Development Group: 1/16/09 01/23/2009 Email sent out on 1/15 to sub-team and asked for comments by 1/21; comments addressed and document finalized (1/23/09) 3) Draft methods of potential

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

The purpose of this CADD/CAP is to present the corrective action alternatives (CAAs) evaluated for CAU 547, provide justification for selection of the recommended alternative, and describe the plan for implementing the selected alternative. Corrective Action Unit 547 consists of the following three corrective action sites (CASs): (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; and(3) CAS 09-99-06, Gas Sampling Assembly. The gas sampling assemblies consist of inactive process piping, equipment, and instrumentation that were left in place after completion of underground safety experiments. The purpose of these safety experiments was to confirm that a nuclear explosion would not occur in the case of an accidental detonation of the high-explosive component of the device. The gas sampling assemblies allowed for the direct sampling of the gases and particulates produced by the safety experiments. Corrective Action Site 02-37-02 is located in Area 2 of the Nevada National Security Site (NNSS) and is associated with the Mullet safety experiment conducted in emplacement borehole U2ag on October 17, 1963. Corrective Action Site 03-99-19 is located in Area 3 of the NNSS and is associated with the Tejon safety experiment conducted in emplacement borehole U3cg on May 17, 1963. Corrective Action Site 09-99-06 is located in Area 9 of the NNSS and is associated with the Player safety experiment conducted in emplacement borehole U9cc on August 27, 1964. The CAU 547 CASs were investigated in accordance with the data quality objectives (DQOs) developed by representatives of the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAU 547. Existing radiological survey data and historical knowledge of the CASs were sufficient to meet the DQOs and evaluate CAAs without additional investigation. As a result, further investigation of the CAU 547 CASs was not required. The following CAAs were identified for the gas sampling assemblies: (1) clean closure, (2) closure in place, (3) modified closure in place, (4) no further action (with administrative controls), and (5) no further action. Based on the CAAs evaluation, the recommended corrective action for the three CASs in CAU 547 is closure in place. This corrective action will involve construction of a soil cover on top of the gas sampling assembly components and establishment of use restrictions at each site. The closure in place alternative was selected as the best and most appropriate corrective action for the CASs at CAU 547 based on the following factors: (1) Provides long-term protection of human health and the environment; (2) Minimizes short-term risk to site workers in implementing corrective action; (3) Is easily implemented using existing technology; (4) Complies with regulatory requirements; (5) Fulfills FFACO requirements for site closure; (6) Does not generate transuranic waste requiring offsite disposal; (7) Is consistent with anticipated future land use of the areas (i.e., testing and support activities); and (8) Is consistent with other NNSS site closures where contamination was left in place.

Mark Krauss

2011-09-01T23:59:59.000Z

302

FY13 Affirmative Action Program Plan for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Strategic Plan: http: humancapital.doe.govresourcesDOE-Human-Capital-Strategic-Plan-20 ll- 2015.pdf. F. Section 307 of the Civil Service Reform Act of 1978. G....

303

Mainstreaming Climate Change Adaptation into Development Planning...  

Open Energy Info (EERE)

Mainstreaming Climate Change Adaptation into Development Planning: A Guide for Practitioners Jump to: navigation, search Tool Summary Name: Mainstreaming Climate Change Adaptation...

304

Strategic Petroleum Reserve Plan. Distribution Plan for the Strategic Petroleum Reserve. Amendment No. 3. Energy Action DOE No. 5  

SciTech Connect

Purpose of this Strategic Petroleum Reserve (SPR) Plan Amendment is to provide a Distribution Plan, setting forth the method of drawdown and distribution of the Reserve. Chapter VII of the SPR Plan contained a Distribution Plan which identified and discussed the major objectives, criteria and other factors that will be considered in developing the detailed plan. This Amendment replaces Chapter VII of the SPR Plan in its entirety.

1979-10-01T23:59:59.000Z

305

Renewable energy plan of action for American Samoa  

Science Conference Proceedings (OSTI)

American Samoa has no indigenous fossil fuels and is almost totally dependent for energy on seaborne petroleum. However, the seven Pacific Islands located at 14 degrees south latitude that constitute American Samoa have a wide variety of renewable resources with the potential for substituting for imported oil. Included as possible renewable energy conversion technologies are solar thermal, photovoltaics, wind, geothermal, ocean thermal, and waste-to-energy recovery. This report evaluates the potential of each of these renewable energy alternatives and establishes recommended priorities for their development in American Samoa. Rough cost estimates are also included. Although renewable energy planning is highly site specific, information in this report should find some general application to other tropical insular areas.

Shupe, J.W. (USDOE San Francisco Operations Office, Honolulu, HI (USA). Pacific Site Office); Stevens, J.W. (Sandia National Labs., Albuquerque, NM (USA))

1990-11-01T23:59:59.000Z

306

Coal without carbon: an investment plan for federal action  

Science Conference Proceedings (OSTI)

This study examines several technologies for CCS that are not currently receiving adequate development support but that could - in the right policy environment - provide the kind of significant cost reductions (and significant improvements in efficiency) that could greatly accelerate broad, economically attractive CCS deployment. Clean Air Task Force selected these technology areas (though not the technologies themselves) and solicited reports from experts in each field to explore how these technologies might fit into a broader CCS deployment strategy. Each expert was asked to develop a research, development, and demonstration (RD&D) 'road map' that could efficiently move each technology from the laboratory into the commercial mainstream. Because the chapter authors are either technical experts or commercial players and are not, for the most part, energy policy experts, subsequent work will translate their RD&D recommendations into actionable policy proposals. The heart of this report consists of four chapters on advanced coal and CCS technologies: underground coal gasification (UCG), written by Julio Friedmann at Lawrence Livermore National Laboratory; Next generation coal gasification (surface-based gasification) led by Eric Redman at Summit Power Group; Advanced technologies for post-combustion capture (PCC) of CO{sub 2}, led by Howard Herzog at Massachusetts Institute of Technology; and RD&D to speed commercialization of geological CO{sub 2} sequestration (GCS), led by Julio Friedmann. 12 refs., 5 figs., 2 tabs.

Pettus, A.; Tatsutani, M. (eds.)

2009-09-15T23:59:59.000Z

307

Clean Water Action Plan: Restoring and protecting America`s waters  

Science Conference Proceedings (OSTI)

On October 18, 1997, the 25th anniversary of the enactment of the Clean Water Act, the Vice President called for a renewed effort to restore and protect water quality. The Vice President asked that the Secretary of Agriculture and the Administrator of the Environmental Protection Agency (EPA), working with other affected agencies, develop a Clean Water Action Plan that builds on clean water successes and addresses three major goals: (1) enhanced protection from public health threats posed by water pollution; (2) more effective control of polluted runoff; and (3) promotion of water quality protection on a watershed basis.

NONE

1998-02-01T23:59:59.000Z

308

Technologies Theme Third Theme Action Plan January 2011  

E-Print Network (OSTI)

programmes. TAP 3 contains an action in two parts addressing aerial and submersible vehicles. i) Aerial survey natural variation and its consequences and the challenges associated

Edinburgh, University of

309

Corrective action investigation plan for CAU No. 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This Correction Action Investigation Plan contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Landfill Complex, CAU No. 424, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, nevada. The CAU 424 is comprised of eight individual landfill sites that are located around and within the perimeter of the Area 3 Compound. Due to the unregulated disposal activities commonly associated with early landfill operations, an investigation will be conducted at each CAS to complete the following tasks: identify the presence and nature of possible contaminant migration from the landfills; determine the vertical and lateral extent of possible contaminant migration; ascertain the potential impact to human health and the environment; and provide sufficient information and data to develop and evaluate appropriate corrective action strategies for each CAS.

NONE

1997-04-01T23:59:59.000Z

310

Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

T. M. Fitzmaurice

2000-08-01T23:59:59.000Z

311

Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1  

SciTech Connect

This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites''. The seven-step data quality objectives (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQOs address the primary problem that sufficient information is not available to determine the appropriate corrective action for the CASs. Corrective action closure alternatives (i.e., no further action, close in place, or clean closure) will be recommended for CAU 511 based on an evaluation of all the DQO required data. Under the ''Federal Facility Agreement and Consent Order'', the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2004-08-01T23:59:59.000Z

312

Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1  

SciTech Connect

This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites''. The seven-step data quality objectives (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQOs address the primary problem that sufficient information is not available to determine the appropriate corrective action for the CASs. Corrective action closure alternatives (i.e., no further action, close in place, or clean closure) will be recommended for CAU 511 based on an evaluation of all the DQO required data. Under the ''Federal Facility Agreement and Consent Order'', the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2004-08-01T23:59:59.000Z

313

Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-04-06T23:59:59.000Z

314

Conservation Resource Advisory Role in Council Plan DevelopmentRole in Council Plan Development  

E-Print Network (OSTI)

Conservation Resource Advisory Committee Role in Council Plan DevelopmentRole in Council Plan on conservation resource potential and deployment § Work Plan Focused in Policy Issues slide 2 ­ Not a decision Work Plan Elements § Conservation Resource Assessment ­ Cost-Effectiveness Methodology ­ Achievable

315

Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

Corrective Action Unit 166 is located in Areas 2, 3, 5, and 18 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit (CAU) 166 is comprised of the seven Corrective Action Sites (CASs) listed below: (1) 02-42-01, Cond. Release Storage Yd - North; (2) 02-42-02, Cond. Release Storage Yd - South; (3) 02-99-10, D-38 Storage Area; (4) 03-42-01, Conditional Release Storage Yard; (5) 05-19-02, Contaminated Soil and Drum; (6) 18-01-01, Aboveground Storage Tank; and (7) 18-99-03, Wax Piles/Oil Stain. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on February 28, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 166. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the CAI for CAU 166 includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling. (2) Conduct radiological surveys. (3) Perform field screening. (4) Collect and submit environmental samples for laboratory analysis to determine if contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval.

David Strand

2006-06-01T23:59:59.000Z

316

DOE/EIS-0332: Mitigation Action Plan for th eMcNary-John Day...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project This Mitigation Action Plan (MAP) is for the McNary-John Day Transmission Line Project, which involves construction and operation of a new...

317

NIST Priority Action Plan 2 Guidelines for Assessing Wireless Standards for Smart Grid  

E-Print Network (OSTI)

NIST Priority Action Plan 2 Guidelines for Assessing Wireless Standards for Smart Grid Applications ..................................................................................................................................... 8 3 SMART GRID CONCEPTUAL MODEL AND BUSINESS FUNCTIONAL REQUIREMENTS .................. 13 3.1 SMART GRID CONCEPTUAL REFERENCE DIAGRAMS

Magee, Joseph W.

318

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Objective 1, Action 3: 2/5/09 Objective 1, Action 3: 2/5/09 Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE-recognized expert. (Dave Chaney) Action 3: Draft methods of potential designation/institutionalization of "Recognized" Experts Methods of potential designation/institutionalization of DOE Recognized Experts would follow from Qualification methods listed in Objective 1, Action 2 (Draft Attributes, Responsibilities and Qualification methods for current DOE/ NNSA Experts: January 23, 2009): "Qualification" methods include: 1) Oral Boards of technical peers, supervisors or approving officials, understanding that experts may have no technical peers; 2) Written exams combined with demonstrated successful application of the

319

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1  

Science Conference Proceedings (OSTI)

This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).

Irene Farnham and Sam Marutzky

2011-07-01T23:59:59.000Z

320

Individual Development Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Individual Development Plan Individual Development Plan Individual Development Plan To be effective, training decisions made at the organizational and departmental levels must be informed by the needs of the individual. An individual development plan (IDP) is cooperatively developed between a supervisor and an employee to identify training needs that address mandatory training, essential competencies, legal requirements, career development and professional growth. This allows the employee and supervisor to focus limited resources in the area of greatest need for the individual and the organization. IDPs should be updated annually. The IDP tool resides in the Employee Self Service (ESS) system, a web-based application for all DOE Federal Employees. For instructions on using the IDP tool, visit the ESS website (once logged

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Developing The Organized Village of Kasaan's Strategic Energy Plan  

SciTech Connect

The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribeâ??s blueprint for creating long term energy selfâ?sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both â??supplyâ?sideâ? options of the development of sustainable energy sources, as well as â??demand-sideâ? options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

Hamar Glenn P

2013-02-19T23:59:59.000Z

322

MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan prepared under 1021.331 of this part: 7. Wetland impacts from the proposed natural gas pipeline construction by Northern Natural Gas Company (NNG). 1.1 Purpose of the...

323

Emergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas  

E-Print Network (OSTI)

-492-6025. For Non-Emergency Fire and Natural Gas Questions call the CU Fire Marshall @ 303-492-4042. AdditionalEmergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas leaks, the following actions should be taken: 1) Life Safety First 2) Evacuate Immediate Area 3

Colorado at Boulder, University of

324

Energy Education and Workforce Development: K-12 Lesson Plans...  

NLE Websites -- All DOE Office Websites (Extended Search)

inform your curriculum. Activities Energy Awareness has both an activity and a coloring book for kids. Coloring Book PDF Activity Book PDF Energy Action List PDF This action plan...

325

EAC Recommendations for DOE Action Regarding Development of the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next...

326

Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada with ROTC1, Revision 0  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: 03-51-01, Leach Pit 06-04-02, Septic Tank 06-05-03, Leach Pit 06-05-04, Leach Bed 06-59-03, Building CP-400 Septic System 06-59-04, Office Trailer Complex Sewage Pond 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.

Grant Evenson

2008-05-01T23:59:59.000Z

327

Multi-criteria assessment for linking regional conservation planning and farm-scale actions  

Science Conference Proceedings (OSTI)

Regional-scale ecological restoration priorities such as increasing the extent and quality of native vegetation are generally planned at catchment scales, while on-ground restoration actions are generally implemented at paddock or farm scales. This paper ... Keywords: Conservation planning, GIS, MCA, Precision agriculture

A. Zerger; G. Warren; P. Hill; D. Robertson; A. Weidemann; K. Lawton

2011-01-01T23:59:59.000Z

328

Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

D. L. Gustafason

2001-02-01T23:59:59.000Z

329

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland  

Science Conference Proceedings (OSTI)

The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

1995-05-01T23:59:59.000Z

330

Geothermal development plan: northern Arizona counties  

Science Conference Proceedings (OSTI)

The Northern Counties Area Development Plan evaluated the regional market potential for utilizing geothermal energy. This study identified five potential geothermal resource areas, four of which have low temperature (Arizona.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

331

Idaho National Engineering Laboratory site development plan  

SciTech Connect

This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved.

Not Available

1994-09-01T23:59:59.000Z

332

CfRN-Developing a Low Carbon Growth Plan | Open Energy Information  

Open Energy Info (EERE)

CfRN-Developing a Low Carbon Growth Plan CfRN-Developing a Low Carbon Growth Plan Jump to: navigation, search Tool Summary Name: CfRN Low Carbon Growth Plan Agency/Company /Organization: Coalition for Rainforest Nations Sector: Land Focus Area: Forestry Topics: GHG inventory, Low emission development planning Resource Type: Guide/manual, Lessons learned/best practices, Publications Website: www.rainforestcoalition.org CfRN Low Carbon Growth Plan Screenshot References: CfRN Low Carbon Growth Plan[1] Logo: CfRN Low Carbon Growth Plan "Political and business leaders worldwide realise the need for immediate and effective action to respond to climate change. This action may include policies to reduce greenhouse gas emissions, to curtail deforestation or to promote afforestation and other carbon sink policies. Most countries will

333

Heavy Ion Fusion development plan  

SciTech Connect

Some general cnsiderations in the fusion development program are given. The various factors are considered that must be determined before heavy ion fusion can be assessed. (MOW)

Maschke, A.W.

1978-01-01T23:59:59.000Z

334

Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment  

SciTech Connect

This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

Not Available

1991-08-23T23:59:59.000Z

335

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

336

HWMA/RCRA CLOSURE PLAN FOR THE MATERIALS TEST REACTOR WING (TRA-604) LABORATORY COMPONENTS VOLUNTARY CONSENT ORDER ACTION PLAN VCO-5.8 D REVISION2  

SciTech Connect

This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the laboratory components of the Test Reactor Area Catch Tank System (TRA-630) that are located in the Materials Test Reactor Wing (TRA-604) at the Reactor Technology Complex, Idaho National Laboratory Site, to meet a further milestone established under Voluntary Consent Order Action Plan VCO-5.8.d. The TRA-604 laboratory components addressed in this closure plan were deferred from the TRA-630 Catch Tank System closure plan due to ongoing laboratory operations in the areas requiring closure actions. The TRA-604 laboratory components include the TRA-604 laboratory warm wastewater drain piping, undersink drains, subheaders, and the east TRA-604 laboratory drain header. Potentially contaminated surfaces located beneath the TRA-604 laboratory warm wastewater drain piping and beneath the island sinks located in Laboratories 126 and 128 (located in TRA-661) are also addressed in this closure plan. The TRA-604 laboratory components will be closed in accordance with the interim status requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, Subparts G and J. This closure plan presents the closure performance standards and the methods for achieving those standards.

KIRK WINTERHOLLER

2008-02-25T23:59:59.000Z

337

Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada: Revision 0  

SciTech Connect

The general purpose of this Corrective Action Investigation Plan is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective action alternatives (CAAs) for Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. Located in Areas 6 and 15 on the NTS, CAU 543 is comprised of a total of seven corrective action sites (CASs), one in Area 6 and six in Area 15. The CAS in Area 6 consists of a Decontamination Facility and its components which are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency Farm and are related to waste disposal activities at the farm. Sources of possible contamination at Area 6 include potentially contaminated process waste effluent discharged through a process waste system, a sanitary waste stream generated within buildings of the Decon Facility, and radiologically contaminated materials stored within a portion of the facility yard. At Area 15, sources of potential contamination are associated with the dairy operations and the animal tests and experiments involving radionuclide uptake. Identified contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, petroleum hydrocarbons, pesticides, herbicides, polychlorinated biphenyls, metals, and radionuclides. Three corrective action closure alternatives - No Further Action, Close in Place, or Clean Closure - will be recommended for CAU 543 based on an evaluation of all the data quality objective-related data. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-05-03T23:59:59.000Z

338

Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): 02-23-04, Atmospheric Test Site - Whitney 02-23-05, Atmospheric Test Site T-2A 02-23-06, Atmospheric Test Site T-2B 02-23-08, Atmospheric Test Site T-2 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU 105 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted after the plan is approved.

Patrick Matthews

2012-09-01T23:59:59.000Z

339

Corrective Action Investigation Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada, REVISION 0, march 1999  

Science Conference Proceedings (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform video surveys of the discharge and outfall lines. (2) Collect samples of material in the septic tanks. (3) Conduct exploratory trenching to locate and inspect subsurface components. (4) Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. (5) Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. (6) Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. (7) Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. (10) Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. (11) Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.

DOE /NV

1999-03-26T23:59:59.000Z

340

Standards application and development plan for solar thermal technologies  

DOE Green Energy (OSTI)

The Solar Energy Research Institute, at the request of DOE, is developing a Quality Assurance and Standards (QA and S) Plan for solar thermal technologies. Unlike the legislative directives concerning standards for the Photovoltaic (PV) and Solar Heating and Cooling of Buildings (SHAC) programs, which required prior development of criteria, relevant legal requirements for ST involved developing sound commercial practices. Since standards development and implementation of PV and SHAC technologies were begun earlier, a lessons-learned approach is used to develop a QA and S plan for ST. Thus, the keystone of the plan is a series of functional and standards matrices, contained in this report, developed from input from ST users and from the industry that will be continually reviewed and updated as commercial aspects develop. The matrices highlight codes, standards, test methods, functions and definitions that need to be developed. They will be submitted through ANSI for development by national consensus bodies. A contingency action is proposed for standards development if specific input is lacking at the committee level or if early development of a standard would hasten commercialization or gain needed jurisdictional acceptance. Agency funding will be sought before consensus review to support development of draft standards by specialists, laboratories, and consultants where qualifying requirements apply.

Cobb, H.R.W.

1981-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Developing digital cartography in rural planning applications  

Science Conference Proceedings (OSTI)

The main objective of the present study is to develop an efficient methodology at a reasonable cost, that will allow the use of the latest technological developments in the areas of image analysis and geographical information systems (GIS) for the generation, ... Keywords: Cartography updating, Digital aerial photogrammetry, GIS, High resolution satellite, Rural planning and development

Fernando J. Aguilar; Fernando Carvajal; Manuel A. Aguilar; Francisco Agera

2007-02-01T23:59:59.000Z

342

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions necessary for the closure of Corrective Action Unit (CAU) 538: Spill Sites, Nevada Test Site, Nevada. It has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. A SAFER may be performed when the following criteria are met: (1) Conceptual corrective actions are clearly identified (although some degree of investigation may be necessary to select a specific corrective action before completion of the Corrective Action Investigation [CAI]). (2) Uncertainty of the nature, extent, and corrective action must be limited to an acceptable level of risk. (3) The SAFER Plan includes decision points and criteria for making data quality objective (DQO) decisions. The purpose of the investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. This SAFER Plan identifies decision points developed in cooperation with the Nevada Division of Environmental Protection (NDEP) and where DOE will reach consensus with NDEP before beginning the next phase of work.

Alfred Wickline

2006-04-01T23:59:59.000Z

343

Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Revision 1)  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed for Frenchman Flat Corrective Action Unit (CAU) 98. The Frenchman Flat CAU is located along the eastern border of the Nevada Test Site (NTS) and includes portions of Areas 5 and 11. The Frenchman Flat CAU constitutes one of several areas of the Nevada Test Site used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. The CAIP describes the Corrective Action Investigation (CAI) to be conducted at the Frenchman Flat CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The Frenchman Flat CAI will be conducted by the Underground Test Area (UGTA) Project which is a part of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Project. The CAIP is a requirement of the Federal Facility Agreement and Consent Order (FFACO) (1996 ) agreed to by the U.S. Department of Energy (DOE), the Nevada Division of Environmental Protection (NDEP), and the U.S. Department of Defense (DoD). Based on the general definition of a CAI from Section IV.14 of the FFACO, the purpose of the CAI is ''...to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities...'' (FFACO, 1996). However, for the Underground Test Area (UGTA) CAUs, ''...the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use.'', as stated in Appendix VI of the FFACO (1996). According to the UGTA strategy (Appendix VI of the FFACO), the CAI of a given CAU starts with the evaluation of the existing data. New data collection activities are generally contingent upon the results of the modeling and may or may not be part of the CAI. Such is the case for the Frenchman Flat CAU. The current scope of the Frenchman Flat CAI includes the development and use of a three-dimensional (3-D), numerical, CAU-scale groundwater flow and contaminant transport model to predict the location of the contaminant boundary. The CAU model will be developed and used to predict the location of the contaminant boundary. The scope of this CAI does not currently include any characterization activities; however, such activities will be conducted if the CAU model results indicate that further characterization information is needed to develop a sufficiently reliable CAU model. Two areas of importance to the CAU model are the model area and the investigation area. The CAU-model area will be selected to encompass the Frenchman Flat CAU and the region located immediately downgradient where contamination may migrate. The extent of the CAU-model area is dependent on the extent of contamination and is uncertain at this point. The extent of the investigation area is not expected to increase during the CAI.

USDOE /NV

1999-07-01T23:59:59.000Z

344

Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada with ROTC 1 (Revision 0, September 2000)  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.

Robert Andrews; Sam Marutzky

2000-09-27T23:59:59.000Z

345

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: 4/09/09 5: 4/09/09 Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE-recognized expert. (Dave Chaney) Action 5: Recommend definition of DOE/NNSA Recognized Expert The benchmarking of other agencies indicates that "Recognized Experts" may be used in a training environment as Subject Matter Experts, but that industry and regulators generally rely on educational degrees from accredited universities, internal corporate/agency qualification and certification programs or Professional Engineer (PE)/ Independent Body Certifications and experience for operational/maintenance/functional expertise, without having a formal cadre of "Recognized Experts".

346

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

NSTec Environmental Restoration

2006-09-01T23:59:59.000Z

347

Geothermal development plan: Yuma county  

DOE Green Energy (OSTI)

One hot spring and 33 wells drilled in the county discharge water at temperatures sufficient for direct-use geothermal applications such as process heat and space heating and cooling. Currently, one industry within the county has been identified which may be able to use geothermal energy for its process heat requirements. Also, a computer simulation model was used to predict geothermal energy on line as a function of time under both private and city-owned utility development of the resource.

White, D.H.

1981-01-01T23:59:59.000Z

348

Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: 18-22-05, Drum 18-22-06, Drums (20) 18-22-08, Drum 18-23-01, Danny Boy Contamination Area 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

Patrick Matthews

2010-02-01T23:59:59.000Z

349

Geothermal development plan: northern Arizona  

DOE Green Energy (OSTI)

Much of the northern counties (Apache, Coconino, Gila, Mohave, Navajo and Yavapai) is located in the Colorado Plateau province, a region of low geothermal potential. Two areas that do show some potential are the Flagstaff - San Francisco Peaks area and the Springerville area. Flagstaff is rapidly becoming the manufacturing center of Arizona and will have many opportunities to use geothermal energy to satisfy part of its increasing need for energy. Using a computer simulation model, projections of geothermal energy on line as a function of time are made for both private and city-owned utility development of a resource.

White, D.H.; Goldstone, L.A.

1981-01-01T23:59:59.000Z

350

Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

K. B. Campbell

2002-04-01T23:59:59.000Z

351

Changes related to "Environment and Development Action in the...  

Open Energy Info (EERE)

Special page Share this page on Facebook icon Twitter icon Changes related to "Environment and Development Action in the Third World (ENDA-TM)" Environment and...

352

Pages that link to "Environment and Development Action in the...  

Open Energy Info (EERE)

Edit History Share this page on Facebook icon Twitter icon Pages that link to "Environment and Development Action in the Third World (ENDA-TM)" Environment and...

353

Catalyzing Cooperative Action for Low Emissions Development Side...  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit History Facebook icon Twitter icon Catalyzing Cooperative Action for Low Emissions Development Side Event in Bonn Jump to: navigation, search...

354

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(1/23/09) (1/23/09) Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE-recognized expert. (Dave Chaney) Action 2: Draft Attributes, Responsibilities and Qualification methods for current DOE/ NNSA Experts. (Draft dated 1/14/09) Attributes of a DOE/NNSA expert should consider definitions and applications of the term "expert" within DOE and the commercial nuclear industry, resulting in the capability to provide high quality technical advice and deliverables: 1) The DOE FTCP Functional Area Qualification Standard Template defines an expert level of knowledge as: * Expert level is defined as a comprehensive, intensive knowledge of the subject or process sufficient to provide advice in the absence of procedural guidance.

355

Geothermal development plan: Pima County  

DOE Green Energy (OSTI)

The Pima County Area Development evaluated the county-wide market potential for utilizing geothermal energy. The study identified four potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F), and in addition, one area is identified as having a temperature of 147{sup 0}F (297{sup 0}F). Geothermal resources are found to occur in Tucson where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing sector and the existence of major copper mines provide opportunities for the direct utilization of geothermal energy. However, available water supplies are identified as a major constraint to projected growth. The study also includes a regional energy analysis, future predictions for energy consumption and energy prices. A major section of the report is aimed at identifying potential geothermal users in Pima County and providing projections of maximum economic geothermal utilization. The study identifies 115 firms in 32 industrial classes that have some potential for geothermal use. In addition, 26 agribusiness firms were found in the county.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

356

Corrective Action Investigation Plan for Corrective Action Unit No. 423: Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV), the State of Nevada Division of Environmental Protection (NDEP), and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUS) or Corrective Action Sites (CASs) (FFACO, 1996). As per the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU No. 423, the Building 03-60 Underground Discharge Point (UDP), which is located in Area 3 at the Tonopah Test Range (TTR). The TTR, part of the Nellis Air Force Range, is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figures 1-1 and 1-2). Corrective Action Unit No. 423 is comprised of only one CAS (No. 03-02-002-0308), which includes the Building 03-60 UDP and an associated discharge line extending from Building 03-60 to a point approximately 73 meters (m) (240 feet [ft]) northwest as shown on Figure 1-3.

DOE /NV

1997-10-01T23:59:59.000Z

357

Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada, Rev. No.: 1 with ROTC 1 and 2  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 552 is comprised of the one Corrective Action Site which is 12-23-05, Ponds. One additional CAS, 12-06-04, Muckpile (G-Tunnel Muckpile), was removed from this CAU when it was determined that the muckpile is an active site. A modification to the FFACO to remove CAS 12-06-04 was approved by the Nevada Division of Environmental Protection (NDEP) on December 16, 2004. The G-Tunnel ponds were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites'' (REECo, 1991). Corrective Action Unit 552 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Therefore, additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting the corrective action alternatives for the site. The CAI will include field inspections, radiological surveys, and sampling of appropriate media. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.

David A. Strand

2005-01-01T23:59:59.000Z

358

Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.

Grant Evenson

2006-04-01T23:59:59.000Z

359

Corrective Action Investigation Plan for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit (CAU) 557 is located in Areas 1, 3, 6, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada, and is comprised of the four corrective action sites (CASs) listed below: 01-25-02, Fuel Spill 03-02-02, Area 3 Subdock UST 06-99-10, Tar Spills 25-25-18, Train Maintenance Bldg 3901 Spill Site These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 3, 2008, by representatives of the Nevada Division of Environmental Protection (NDEP); U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 557. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 557 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological survey at CAS 25-25-18. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern are present. If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. Collect samples of investigation-derived waste, as needed, for waste management purposes.

Alfred Wickline

2008-07-01T23:59:59.000Z

360

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada  

SciTech Connect

The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

D. H. Cox

2000-07-01T23:59:59.000Z

362

Corrective Action Investigation Plan for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

CAU 571 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 571, which comprises the following corrective action sites (CASs): 09-23-03, Atmospheric Test Site S-9F 09-23-04, Atmospheric Test Site T9-C 09-23-12, Atmospheric Test Site S-9E 09-23-13, Atmospheric Test Site T-9D 09-45-01, Windrows Crater These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on March 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (now the Nevada Field Office). The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 571. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 571 CASs are from nuclear testing activities. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default contamination boundaries at CAU 571 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based FAL. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Chemical contamination will be evaluated by comparing soil sample results to the FAL. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Bailey, Bernadine; Matthews, Patrick

2013-07-01T23:59:59.000Z

363

Corrective action investigation plan for Project Shoal Area CAU No. 416  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) is part of an ongoing US Department of Energy (DOE)-funded project for the investigation of Corrective Action Unit (CAU) No. 416, Project Shoal Area (PSA). Project Shoal was conducted to determine whether seismic waves produced by underground nuclear testing could be differentiated from naturally occurring earthquakes. The PSA site is located approximately 30 miles southeast of Fallon, Nevada, in the northern portion of Sand Springs Mountains in Churchill County. This CAIP will be implemented in accordance with the Federal Facility Agreement and Consent Order, the Industrial Sites Quality Assurance Project Plan, and all applicable Nevada Division of Environmental Protection policies and regulations.

NONE

1996-08-01T23:59:59.000Z

364

Global Nuclear Energy Partnership Technology Development Plan  

Science Conference Proceedings (OSTI)

This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

David J. Hill

2007-07-01T23:59:59.000Z

365

Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada  

SciTech Connect

Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the discharge line at SWS 1 Septic Tank 33-1A (Figure 3). These concentrations are above the PALs of 3.0 mg/kg and 360 {micro}g/kg, respectively (DOE/NV, 1999) but are below the hazardous regulatory levels for these constituents. The soil will be excavated and disposed in the Nevada Test Site (NTS) Area 23 Sanitary Landfill.

D. S. Tobiason

2000-08-01T23:59:59.000Z

366

2012 National Energy Assurance Planning Conference After-Action Report (August 2012)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 National Energy Assurance Planning Conference 2 National Energy Assurance Planning Conference June 28-29, 2012 Gaylord Hotel and Convention Center, National Harbor, MD After-Action Report August 2012 Co-Sponsored by: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability National Association of State Energy Officials ii | P a g e Table of Contents I. Purpose & Objectives ............................................................................................................ 1 II. Participants ............................................................................................................................ 1 III. Conference Summary ............................................................................................................ 1

367

Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

Patrick Matthews

2010-12-01T23:59:59.000Z

368

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

369

Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities.

NONE

1997-05-14T23:59:59.000Z

370

Corrective Action Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (CADD). However, there is one modification to the selected alternative. Due to the large area that would require fencing, it is proposed that instead of fencing, an appropriate number of warning signs attached to tee posts be used to delineate the use restriction area. CAU 335 is located in Area 6 of the Nevada Test Site (NTS) which is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada. CAU 335 is located in the Area 6 Well 3 Yard approximately 39 km (24 mi) north of Mercury, on the Mercury Highway and several hundred feet (ft) west along Road 6-06. CAU 335 consists of the following three Corrective Action Sites (CASs): CAS 06-20-01, Drums, Oil Waste, Spill; CAS 06-20-02, 20-inch Cased Hole; CAS 06-23-03, Drain Pit. The site history for CAU 335 is provided in the Corrective Action Investigation Plan (DOE/NV, 2000). Briefly, CAS 06-20-01, was used for storing material that was pumped out of CAS 06-20-02 and placed into four 208-liter (L) (55-gall [gal]) drums. The drums were taken to the NTS Area 5 Hazardous Waste Accumulation Site in 1991. CAS 06-20-01 will be closed with no further action required. Any spills associated with CAS 06-20-01 are addressed and considered part of CAS 06-20-02. CAS 06-20-02 was used for disposal of used motor oil, wastewater, and debris for an undetermined amount of time. In 1991, the casing was emptied of its contents, excavated, and backfilled. CAS 06-23-03 was used as a depository for effluent waste from truck-washing activities from 1960-1991.

K. B. Campbell

2002-10-01T23:59:59.000Z

371

The Welsh Government's Action Plan for wild deer  

E-Print Network (OSTI)

CCW CCW WG via FCW WG (SF-SEED) WG (BETS- FDD) To be completed by Dec 2011 Ongoing from 2012 Priority Government BETS Business, Enterprise, Technology and Science FDD Farm Development Division FFMDD Food, Fish

372

Environmental Management Root Cause Analysis Corrective Action Plan Performance  

Energy.gov (U.S. Department of Energy (DOE))

As part of the Departments effort to build a strong project and contract management foundation,a Root Cause Analysis (RCA) was developed through extensive collaboration between DOE'sHeadquarters...

373

Corrective Action Investigation Plan for Corrective Action Unit 266: Area 25 Building 3124 Leachfield, Nevada Test Site, Nevada, Revision 1, February 1999  

SciTech Connect

The Corrective Action Investigation Plan for Corrective Action Unit 266, Area 25 Building 3124 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U.S. Department of Defense. Corrective Action Unit 266 consists of the Corrective Action Site 25-05-09 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 266. Corrective Action Unit 266 is located southwest of Building 3124 which is located southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station. Operations within Building 3124 from 1962 through the early 1990s resulted in effluent releases to the leachfield and associated collection system. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with Test Cell A reactor testing operations, various laboratories including a high-level radioactivity environmental sample handling laboratory, and possibly the Treatability Test Facility. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include radionuclides, oil/diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. Samples will also be analyzed for radionuclides and polychlorinated biphenyls not considered during the DQO process. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform a radiological walkover survey. (2) Perform video and radiation surveys of the discharge and outfall lines. (3) Collect samples from within the septic tank. (4) Mark approximate locations of leachfield distribution lines on the ground surface. (5) Collect subsurface soil samples in areas of the collection system including the septic tank and outfall end of the diversion chamber. (6) Collect subsurface soil samples underlying the leachfield distribution pipes. (7) Field screen samples for volatile organic compounds and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze soil samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total petroleum hydrocarbons (oil/diesel-range organics), and polychlorinated biphenyls. (1) Analyze a minimum of 25 percent of the soil samples for gamma-emitting radionuclides, isotopic uranium, isotopic plutonium, isotopic americium, and strontium-90 if radiological field screening levels are exceeded. (2) Collect samples from native soils beneath the distribution system and analyze for geotechnical/hydrologic parameters. (3) Collect and analyze bioassessment samples at Site Supervisors discretion if volatile organic compounds exceed field-screening levels. Additional sampling and analytical details are presented.

U.S. Department Of Energy, Nevada Operations Office

1999-02-24T23:59:59.000Z

374

EAC Recommendations for DOE Action Regarding Development of the Next  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of the Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System (Energy Management System) - October 17, 2012 EAC Recommendations for DOE Action Regarding Development of the Next Generation Grid Operating System, approved at the October 15-16, 2012 EAC Meeting. EAC Recommendations for DOE Action on the Development of the Next Generation Grid Operating System - October 17, 2012 More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2012 - Monday, October 15, 2012 Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western

375

Corrective Action Investigation Plan for Corrective Action Unit 224: Decon Pad and Septic Systems Nevada Test Site, Nevada, Rev. No.: 0, with ROTC 1 and 2  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 224: Decon Pad and Septic Systems, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 224 is comprised of the nine Corrective Action Sites (CASs) listed below: 02-04-01, Septic Tank (Buried); 03-05-01, Leachfield; 05-04-01, Septic Tanks (4)/Discharge Area; 06-03-01, Sewage Lagoons (3); 06-05-01, Leachfield; 06-17-04, Decon Pad and Wastewater Catch; 06-23-01, Decon Pad Discharge Piping; 11-04-01, Sewage Lagoon; and 23-05-02, Leachfield. Corrective Action Sites 06-05-01, 06-23-01, and 23-05-02 were identified in the 1991 Reynolds Electrical & Engineering Co., Inc. (REECo) inventory (1991). The remaining sites were identified during review of various historical documents. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting a corrective action alternative for each CAS. The CAI will include field inspections, radiological and geological surveys, and sample collection. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.

David A. Strand

2004-04-01T23:59:59.000Z

376

Corrective Action Plan for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada  

SciTech Connect

The Areas 25, 26 and 27 Septic Systems are in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 271. This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for CAU 271. CAU 271 is located on the Nevada Test Site (NTS) approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada, and consists of the following 15 Corrective Action Sites (CAS): CAS 25-04-1, Septic System; CAS 25-04-03, Septic System; CAS25-04-04, Septic System; CAS 25-04-08, Septic System; CAS 25-04-09, Septic System; CAS 25-04-10, Septic System; CAS 25-04-11, Septic System; CAS 26-03-01, Contaminated Water Reservoir; CAS 26-04-1, Septic System; CAS 26-04-02, Septic System; CAS 26-05-01, Radioactive Leachfield; CAS-26-05-03, Septic System; CAS 26-05-04, Septic System; CAS 26-05-05, Septic System; and CAS 27-05-02, Leachfield.

R. B. Jackson

2003-05-01T23:59:59.000Z

377

Corrective Action Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 22 Weather Station Fuel Storage. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during February 1999. Soil samples were collected using a direct-push method. Soil samples were collected at 0.6-m (2-ft) intervals from the surface to 1.8 m (6 ft) below ground surface. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE, 1999b). Soil sample results indicated that two locations in the bermed area contain total petroleum hydrocarbons (TPH) as diesel at concentrations of 124 milligrams per kilogram (mg/kg) and 377 mg/kg. This exceeds the Nevada Division of Environmental Protection (NDEP) regulatory action level for TPH of 100 mg/kg (Nevada Administrative Code, 1996). The TPH-impacted soil will be removed and disposed as part of the corrective action.

D. S. Tobiason

2000-06-01T23:59:59.000Z

378

Corrective Action Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 166 consists of seven Corrective Action Sites (CASs) located in Areas 2, 3, 5, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 166 consists of the following CASs: (1) CAS 02-42-01, Cond. Release Storage Yd - North; (2) CAS 02-42-02, Cond. Release Storage Yd - South; (3) CAS 02-99-10, D-38 Storage Area; (4) CAS 03-42-01, Conditional Release Storage Yard; (5) CAS 05-19-02, Contaminated Soil and Drum; (6) CAS 18-01-01, Aboveground Storage Tank; and (7) CAS 18-99-03, Wax Piles/Oil Stain. Details of the site history and site characterization results for CAU 166 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007).

NSTec Environmental Restoration

2007-10-01T23:59:59.000Z

379

Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 190 is located in Areas 11 and 14 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 190 is comprised of the four Corrective Action Sites (CASs) listed below: (1) 11-02-01, Underground Centrifuge; (2) 11-02-02, Drain Lines and Outfall; (3) 11-59-01, Tweezer Facility Septic System; and (4) 14-23-01, LTU-6 Test Area. These sites are being investigated because existing information is insufficient on the nature and extent of potential contamination to evaluate and recommend corrective action alternatives. Additional information will be obtained before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS by conducting a corrective action investigation (CAI). The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on August 24, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture, and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 190. The scope of the CAU 190 CAI includes the following activities: (1) Move surface debris and/or materials, as needed, to facilitate sampling; (2) Conduct radiological and geophysical surveys; (3) Perform field screening; (4) Collect and submit environmental samples for laboratory analysis to determine whether contaminants of concern (COCs) are present; (5) If COCs are present, collect additional step-out samples to define the lateral and vertical extent of the contamination; (6) Collect samples of source material, if present, to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

Wickline, Alfred

2006-12-01T23:59:59.000Z

380

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada  

SciTech Connect

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

NSTec Environmental Restoration

2010-11-22T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

NSTec Environmental Restoration

2009-07-31T23:59:59.000Z

382

Corrective Action Investigation Plan for Corrective Action Unit 545: Dumps, Waste Disposal Sites, and Buried Radioactive Materials Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

Corrective Action Unit 545, Dumps, Waste Disposal Sites, and Buried Radioactive Materials, consists of seven inactive sites located in the Yucca Flat area and one inactive site in the Pahute Mesa area. The eight CAU 545 sites consist of craters used for mud disposal, surface or buried waste disposed within craters or potential crater areas, and sites where surface or buried waste was disposed. The CAU 545 sites were used to support nuclear testing conducted in the Yucca Flat area during the 1950s through the early 1990s, and in Area 20 in the mid-1970s. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval.

Alfred Wickline

2007-06-01T23:59:59.000Z

383

Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Nevada National Security Site Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0 Scope.................................................................................................................................................. 1 3.0 Background ......................................................................................................................................... 1 4.0 Methodology ....................................................................................................................................... 2

384

Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0 Scope.................................................................................................................................................. 1 3.0 Background ......................................................................................................................................... 1 4.0 Methodology ....................................................................................................................................... 2

385

eap_combustion lab_me 20090306 3/4/2009 1 EMERGENCY ACTION PLAN  

E-Print Network (OSTI)

eap_combustion lab_me 20090306 3/4/2009 1 EMERGENCY ACTION PLAN MECHANICAL ENGINEERING Combustion Lab Plantation Road Mechanical Engineering Emergency Coordinator Name: Randall K@vt.edu Cell: 5402500385 #12;eap_combustion lab_me 20090306 3/4/2009 2 Name: Melissa Williams Phone

Virginia Tech

386

UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1  

E-Print Network (OSTI)

on current building usage. Over time, the definition of top quartile and top decile will change. Energy typically be accommodated within existing envelope budgets through judicious design and attention to energyUCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1 UCSF

Yamamoto, Keith

387

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group  

E-Print Network (OSTI)

's diverse biomass resources for conversion to "low-carbon" biofuels, biogas, and renewable electricity; 2, biomass, biogas, biomethane, biorefinery, biogenic, Bioenergy Action Plan, renewable; biomass residues and biogas. Current bioenergy production in California includes: 33 biomass plants that generate a combined

388

Energy Security, Innovation & Sustainability Initiative Prioritize.A 100-Day Energy Action Plan  

E-Print Network (OSTI)

Energy Security, Innovation & Sustainability Initiative Prioritize.A 100-Day Energy Action Plan recognizes that energy will be a defining challenge for the new Administration--for economic competitiveness, national security and long-term environmental sus- tainability. Energy price and supply volatility impact

389

Development Plan for the Fuel Cycle Simulator  

Science Conference Proceedings (OSTI)

The Fuel Cycle Simulator (FCS) project was initiated late in FY-10 as the activity to develop a next generation fuel cycle dynamic analysis tool for achieving the Systems Analysis Campaign 'Grand Challenge.' This challenge, as documented in the Campaign Implementation Plan, is to: 'Develop a fuel cycle simulator as part of a suite of tools to support decision-making, communication, and education, that synthesizes and visually explains the multiple attributes of potential fuel cycles.'

Brent Dixon

2011-09-01T23:59:59.000Z

390

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final  

SciTech Connect

This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

Not Available

1994-03-01T23:59:59.000Z

391

Corrective Action Investigation Plan for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

CAU 570 comprises the following six corrective action sites (CASs): 02-23-07, Atmospheric Test Site - Tesla 09-23-10, Atmospheric Test Site T-9 09-23-11, Atmospheric Test Site S-9G 09-23-14, Atmospheric Test Site - Rushmore 09-23-15, Eagle Contamination Area 09-99-01, Atmospheric Test Site B-9A These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 570. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The presence and nature of contamination at CAU 570 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed near the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Patrick Matthews

2012-08-01T23:59:59.000Z

392

Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft  

SciTech Connect

The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

Not Available

1994-09-01T23:59:59.000Z

393

Environmental development plan: geothermal energy systems  

DOE Green Energy (OSTI)

To ensure that environmental, health, and safety (EH and S) considerations are addressed adequately in the technology decision making process, the Environmental Development Plan (EDP) identifies and evaluates EH and S concerns; defines EH and S research and related assessments to examine or resolve the concerns; provides a coordinated schedule with the technology program for required EH and S research and developement; and indicates the timing for Environmental Assessments, Environmental Impact Statements, Environmental Readiness Documents, and Safety Analysis Reports. This EDP for geothermal energy systems covers all current and planned activities of the DOE Geothermal Energy Systems. Hydrothermal convection systems, geopressured systems, and hot-dry-rock systems are covered. Environmental concerns and requirements for resolution of these concerns are discussed at length. (MHR)

Not Available

1979-08-01T23:59:59.000Z

394

A Low Carbon Development Guide for Local Government Actions in China  

NLE Websites -- All DOE Office Websites (Extended Search)

A Low Carbon Development Guide for Local Government Actions in China A Low Carbon Development Guide for Local Government Actions in China Title A Low Carbon Development Guide for Local Government Actions in China Publication Type Report LBNL Report Number LBNL-5576e Year of Publication 2012 Authors Zhou, Nan, Stephanie Ohshita, Lynn K. Price, and Nina Zheng Date Published 06/2012 Publisher Lawrence Berkeley National Laboratory Keywords china, china energy, china energy group, energy analysis and environmental impacts department, indicator, industrial energy efficiency, low carbon development, policy studies Abstract Local level actions are crucial for achieving energy saving and greenhouse gas emission reduction targets. Yet it can be challenging to implement new policies and actions due to a lack of information,funding, and capacity at the local level-especially in developing countries such as China. Even though the Chinese government has set national energy and carbon intensity reduction targets, most local governments do not have sufficient knowledge regarding actions to achieve the targets, effectiveness and cost of policies, or how to design and implement a low carbon development plan.

395

Project development plan for East Mesa Geothermal Test Center  

DOE Green Energy (OSTI)

Plans for a test facility for geothermal energy systems and components designed for moderate temperature/low salinity geothermal fluids available at the East Mesa site in the Imperial Valley of California are discussed. Details of the following phases of development are given: technical plan; management plan; procurement and contracting plan; technology transfer and utilization plan; and resource requirements. (JGB)

Not Available

1975-03-01T23:59:59.000Z

396

Low Carbon Development: Planning & Modelling Course | Open Energy  

Open Energy Info (EERE)

Low Carbon Development: Planning & Modelling Course Low Carbon Development: Planning & Modelling Course Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Low Carbon Development: Planning & Modelling Course Agency/Company /Organization: World Bank Sector: Climate Focus Area: Renewable Energy, Economic Development, People and Policy Topics: Low emission development planning, Pathways analysis, Resource assessment Resource Type: Training materials, Workshop Website: einstitute.worldbank.org/ei/course/low-carbon-development Cost: Paid References: Low Carbon Development: Planning & Modelling[1] Program Overview This course has the following modules - (i) Introduction to Low Carbon Development Planning; (ii) Overview for Policymakers; (iii) Power; (iv) Household; (v) Transport - which introduce you to climate change

397

Corrective Action Investigation Plan for Corrective Action Unit 543: Liquid Disposal Units Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1 and 2  

DOE Green Energy (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 543: Liquid Disposal Units, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S Department of Defense (DoD). Corrective Action Unit 543 is located in Area 6 and Area 15 of the NTS, which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Seven corrective action sites (CASs) comprise CAU 543 and are listed below: (1) 06-07-01, Decon Pad; (2) 15-01-03, Aboveground Storage Tank; (3) 15-04-01, Septic Tank; (4) 15-05-01, Leachfield; (5) 15-08-01, Liquid Manure Tank; (6) 15-23-01, Underground Radioactive Material Area; and (7) 15-23-03, Contaminated Sump, Piping. Corrective Action Site 06-07-01, Decon Pad, is located in Area 6 and consists of the Area 6 Decontamination Facility and its components that are associated with decontamination of equipment, vehicles, and materials related to nuclear testing. The six CASs in Area 15 are located at the U.S. Environmental Protection Agency (EPA) Farm and are related to waste disposal activities at the EPA Farm. The EPA Farm was a fully-functional dairy associated with animal experiments conducted at the on-site laboratory. The corrective action investigation (CAI) will include field inspections, video-mole surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions. The CASs within CAU 543 are being investigated because hazardous and/or radioactive constituents may be present at concentrations that could potentially pose a threat to human health and the environment. The seven CASs in CAU 543 primarily consist of sanitary and process waste collection, storage, and distribution systems (e.g., storage tanks, sumps, and piping). Existing information on the nature and extent of potential contamination at these sites is insufficient to evaluate and recommend corrective action alternatives for the CASs. Therefore, additional information will be obtained by conducting a CAI prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS.

David A. Strand

2004-05-01T23:59:59.000Z

398

Corrective Action Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect

The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 22 Sewage Lagoons site. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during September 1999, Soil samples were collected using a direct-push method and a backhoe. Soil samples were collected from the sludge bed, sewage lagoons, strainer box, and Imhoff tank areas. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Soil sample results indicated that the only constituent of concern (COC) detected above Preliminary Action Levels (PALs) was total petroleum hydrocarbons (TPH) as diesel-range organics. This COC was detected in three samples from the sludge bed at concentrations up to 580 milligrams per kilogram (mg/kg). This exceeds the Nevada Division of Environmental Protection (NDEP) regulatory action level for TPH of 100 mg/kg (Nevada Administrative Code, 1996). Excavation of the area during characterization uncovered asphalt debris, four safety poles, and strands of barbed wire. The TPH-impacted soil and debris will be removed and disposed in the NTS Area 6 Hydrocarbon Landfill.

D. S. Tobiason

2000-09-01T23:59:59.000Z

399

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

CAU 104 comprises the following corrective action sites (CASs): 07-23-03, Atmospheric Test Site T-7C 07-23-04, Atmospheric Test Site T7-1 07-23-05, Atmospheric Test Site 07-23-06, Atmospheric Test Site T7-5a 07-23-07, Atmospheric Test Site - Dog (T-S) 07-23-08, Atmospheric Test Site - Baker (T-S) 07-23-09, Atmospheric Test Site - Charlie (T-S) 07-23-10, Atmospheric Test Site - Dixie 07-23-11, Atmospheric Test Site - Dixie 07-23-12, Atmospheric Test Site - Charlie (Bus) 07-23-13, Atmospheric Test Site - Baker (Buster) 07-23-14, Atmospheric Test Site - Ruth 07-23-15, Atmospheric Test Site T7-4 07-23-16, Atmospheric Test Site B7-b 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.

Patrick Matthews

2012-10-01T23:59:59.000Z

400

Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.  

DOE Green Energy (OSTI)

This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage, headgates and fishways. These designs were used to submit for project implementation funding through the WA Salmon Recovery Funding Board. (4) Complete 6 early action projects on Ahtanum Creek--One gravity diversion was replaced with a pump and pump end screen and 5 pump end screens were installed. (5) Conduct two topographic surveys--For the City of Yakima on the Fruitvale diversion for the North Yakima Conservation District to support the installation of a pumping plant which would eliminate the need to divert directly from the Naches River and build the gravel berm each year during low flows. For the Taylor Ditch system for the North Yakima Conservation District to support as feasibility of opening the ditch for habitat and at the same time maintaining irrigation deliveries. (6) Procure materials for use in future YTAHP projects, including siphon pipe, delivery pipe, rock, screens, and water meters. These materials will act as match and support the completion of these subsequent YTAHP projects. Overall, with broad agency support and Action Plan funding through BPA, the YTAHP has achieved substantial enhancements that support aquatic species and which will leverage subsequent work through engineering designs and materials. The program was also able to establish the personnel and equipment support for beginning the stream assessment process on tributaries in Yakima and Kittitas Counties. Completion of this year's effort has provided significant inroads to working on the private lands in two counties which will be vital to future efforts by YTAHP and others to protect and enhance Yakima River Basin habitat.

Myra, David (South Central Washington Resource Conservation and Development Council, Ellensburg, WA); Ready, Carol A. (Kittitas County Water Purveyors, Ellensburg, WA)

2003-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "development action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action  

SciTech Connect

This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

Not Available

1993-12-01T23:59:59.000Z

402

Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

Not Available

1993-08-11T23:59:59.000Z

403

Corrective Action Investigation Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada, July 2002, Rev. No. 0  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 140 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 140 consists of nine Corrective Action Sites (CASs): 05-08-01, Detonation Pits; 05-08-02, Debris Pits; 05-17-01, Hazardous Waste Accumulation Site (Buried); 05-19-01, Waste Disposal Site; 05-23-01, Gravel Gertie; 05-35-01, Burn Pit; 05-99-04, Burn Pit; 22-99-04, Radioactive Waste Dump; 23-17-01, Hazardous Waste Storage Area. All nine of these CASs are located within Areas 5, 22, and 23 of the Nevada Test Site (NTS) in Nevada, approximately 65 miles northwest of Las Vegas. This CAU is being investigated because disposed waste may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present or migrating at concentrations and locations that could potentially pose a threat to human health and the environment. The NTS has been used for various research and development projects including nuclear weapons testing. The CASs in CAU 140 were used for testing, material storage, waste storage, and waste disposal. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will determine if contaminants of potential concern (COPCs) are present in concentrations exceeding preliminary action levels. This data will be evaluated at all CASs. Phase II will determine the extent of the contaminant(s) of concern (COCs). This data will only be evaluated for CASs with a COC identified during Phase I. Based on process knowledge, the COPCs for CAU 140 include volatile organics, semivolatile organics, petroleum hydrocarbons, explosive residues, herbicides, pesticides, polychlorinated biphenyls, metals, and radionuclides. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

NNSA /NV

2002-07-18T23:59:59.000Z

404

Environmental development plan for transportation programs: FY80 update  

DOE Green Energy (OSTI)

This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

1980-09-01T23:59:59.000Z

405

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force to the City of Oakland to Reduce its Dependence on Oil Speaker(s): James Lutz Date: March 21, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose To avoid major disruptions anticipated by Peak Oil, the OIO Task Force recommends that the City of Oakland begin making a series of changes to reduce its dependence on oil in both the near term and long term. Many of the changes the Task Force recommends will take many years to implement but will have significant long term benefits that will help the City to avert potentially catastrophic economic, infrastructure and social repercussions. Given the long lead times required to change such things as transportation

406

Corrective Action Investigation Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada, Revision No. 1 (9/2001)  

DOE Green Energy (OSTI)

This corrective action investigation plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 262 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 262 consists of nine Corrective Action Sites (CASs): Underground Storage Tank (25-02-06), Septic Systems A and B (25-04-06), Septic System (25-04-07), Leachfield (25-05-03), Leachfield (25-05-05), Leachfield (25-05-06), Radioactive Leachfield (25-05-08), Leachfield (25-05-12), and Dry Well (25-51-01). Situated in Area 25 at the Nevada Test Site (NTS), sites addressed by CAU 262 are located at the Reactor-Maintenance, Assembly, and Disassembly (R-MAD); Test Cell C; and Engine-Maintenance, Assembly, and Disassembly (E-MAD) facilities. The R-MAD, Test Cell C, and E-MAD facilities supported nuclear rocket reactor and engine testing as part of the Nuclear Rocket Development Station. The activities associated with the testing program were conducted between 1958 and 1973. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern (COPCs) for the site include oil/diesel-range total petroleum hydrocarbons, volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and gamma-emitting radionuclides, isotopic uranium, isotopic plutonium, strontium-90, and tritium. The scope of the corrective action field investigation at the CAU will include the inspection of portions of the collection systems, sampling the contents of collection system features in situ of leachfield logging materials, surface soil sampling, collection of samples of soil underlying the base of inlet and outfall ends of septic tanks and outfall ends of diversion structures and distribution boxes, collection of soil samples from biased or a combination of biased and random locations within the boundaries of the leachfields, collection of soil samples at stepout locations (where needed) to further define lateral and vertical extent of contamination, conduction of discrete field screening, and logging of soil borings and collection of geotechnical samples to assess soil characteristics. Historical information indicates that significant quantities of radioactive material were produced during the rocket engine testing program, some of which was disposed of in radioactive waste disposal systems (posted leachfields) at each of these locations. Process and sanitary effluents were generated and disposed of in other leachfields. The results of this field investigation will be used to develop and evaluate corrective action alternatives for these CASs.

NNSA /NV

2000-07-20T23:59:59.000Z

407

Corrective Action Investigation Plan for Corrective Action Unit 261: Test Cell A Leachfield System, Nevada Test Site, Nevada UPDATED WITH TECHNICAL CHANGE No.1  

DOE Green Energy (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (FFACO, 1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 261, the Area 25 Test Cell A Leachfield System, which is located in Area 25 at the Nevada Test Site (NTS). The NTS is approximately 88 kilometers (km) (55 miles [mi]) northwest of Las Vegas, Nevada. As presented, CAU 261 is comprised of CASs 25-05-01 and 25-05-07, respectively known as the Leachfield and the Acid Waste Leach Pit (AWLP) (FFACO, 1996). The leachfield is an area with dimensions of approximately 23 by 17 meters (m) (75 by 55 feet [ft]) and is located south of Building 3124, which is southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station (NRDS) (SNPO, 1970). Various operations within Building 3124, from 1962 through 1972, have resulted in liquid waste releases to the leachfield and the AWLP (DOE, 1988a). The surface and subsurface soils in the vicinity of the collection system and leachfield have potentially been impacted by radioactive and other contaminants of potential concern (COPCs) associated with decontamination activities of equipment from Test Cell A.

DOE /NV

1998-09-18T23:59:59.000Z

408

Corrective Action Investigation Plan for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems, Nevada Test Site, Nevada (Rev. 0, April 2001)  

DOE Green Energy (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 271 under the Federal Facility Agreement and Consent Order. Corrective Action Unit