National Library of Energy BETA

Sample records for determinations environmental assessments

  1. EA-1835: Environmental Assessment Determination | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35: Environmental Assessment Determination EA-1835: Environmental Assessment Determination Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project ...

  2. Determining Vulnerability Importance in Environmental Impact Assessment

    SciTech Connect (OSTI)

    Toro, Javier; Duarte, Oscar; Requena, Ignacio; Zamorano, Montserrat

    2012-01-15

    The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed. - Research Highlights: Black-Right-Pointing-Pointer The concept of vulnerability could be considered defining Vulnerability Importance included in qualitative EIA methodology. Black-Right-Pointing-Pointer The use of the concept of environmental vulnerability could reduce the subjectivity of qualitative methods of EIA. Black-Right-Pointing-Pointer A method to quantify the Vulnerability Importance proposed provides a comprehensive overview of the environmental state. Black-Right-Pointing-Pointer Results in Colombia highlight the usefulness and objectivity of this method.

  3. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    728D Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Approved for Public Release; Further Disseminat ion Uillimited June 2011 DOE/EA-1728D June 2011 1 2 3 4 5 6 This page intentionally left blank. 7 8 U.S. Department of Energy DOE/EA-1728D Draft Environmental Assessment iii June 2011 CONTENTS 1 2 1.0 INTRODUCTION

  4. ORISE: Environmental assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental assessments An ORISE technicians performs an environmental assessment The Oak Ridge Institute for Science and Education (ORISE) performs independent, objective environmental assessments to define the extent of radiological contamination at sites scheduled for decontamination and decommissioning (D&D). A fundamental aspect of all D&D projects, these environmental assessments provide guidance to determine the best remediation procedures and are a cost-effective method of

  5. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASSESSMENT (EA) FOR THE RECONSTRUCTION OF THE SOUTH ACCESS ROAD (CR 802) IN SUPPORT OF THE DEPARTMENT OF ENERGY, WASTE ISOLATION PILOT PLANT (WIPP) IN EDDY COUNTY, NEW MEXICO NEPA #: DOI-BLM-NM-P020-2010-0011-EA PREPARED IN COOPERATION WITH: DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE P. O. BOX 2078 CARLSBAD, NM 88221-2078 PREPARED BY: OWEN W. LOFTON SUPERVISORY MULTI RESOURCES SPECIALIST BUREAU OF LAND MANAGEMENT CARLSBAD FIELD OFFICE 620 EAST GREENE CARLSBAD, NM 88220 ENVIRONMENTAL ASSESSMENT

  6. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  7. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Princeton Site Office (PSO) PSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 National Environmental Policy Act (NEPA) Documents Environmental

  8. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) SLAC Site Office (SSO) SSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information SLAC Site Office U.S. Department of Energy Bldg 41, M/S 08A 2575 Sand Hill Road Menlo Park, CA 94025 P: (650) 926-2505 National Environmental Policy Act (NEPA) Documents Environmental

  9. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environment, Safety and Health Assessments Environment, Safety and Health Assessments The Department of Energy's Office of Environment, Safety and Health Assessments, within the Office of Enterprise Assessments, is responsible for conducting assessments to provide information on programs and performance in protecting our workers, the public, and environment from hazards present at Department sites and operations. This information provides assurance to our stakeholders and identifies areas for

  10. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Argonne Site Office (ASO) ASO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Argonne Site Office U.S. Department of Energy 9800 South Cass Avenue Building 201 Argonne, IL 60439 P: (630) 252-8637 National Environmental Policy Act (NEPA) Documents

  11. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Berkeley Site Office (BSO) BSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Berkeley Site Office U.S. Department of Energy One Cyclotron Road Berkeley, CA 94720 P: (510) 486-5784 E: Email Us National Environmental Policy Act (NEPA) Documents

  12. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Fermi Site Office (FSO) FSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Fermi Site Office U.S. Department of Energy MS 118 P.O. Box 2000 Kirk Road and Pine Street Batavia, IL 60510 P: (630) 840-3281 F: (630) 840-3285 National Environmental Policy Act

  13. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Oak Ridge National Laboratory Site Office (OSO) OSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Oak Ridge National Laboratory Site Office U.S. Department of Energy Post Office Box 2008 Oak Ridge, TN 37831-6269 P: (865) 576-0710 National Environmental Policy Act

  14. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 National Environmental Policy Act (NEPA)

  15. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Safety and Security Policy (SSP) SSP Home About Frequently Used Resources NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Continuity of Operations (COOP) Implementation Plan Contact Information Safety and Security Policy U.S. Department of Energy SC-31/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P:

  16. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) NBL Program Office NBL PO Home About Programs Certified Reference Materials (CRMs) NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements News Safety Data Sheets (SDS) for NBL Program Office Certified Reference Materials (CRM) Contact Information NBL Program Office U.S. Department of Energy Building 201 9800 South Cass Avenue

  17. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, 2005) The Environmental Style: Writing Environmental Assessments and Impact Statements (DOE, ...

  18. The Environmental Style: Writing Environmental Assessments and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide ...

  19. Environmental Impact Statements and Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the ...

  20. ISC-Chicago Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Office Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  1. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  2. Categorical Exclusion Determinations: Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued ...

  3. EA-1535: Final Programmatic Environmental Assessment | Department...

    Energy Savers [EERE]

    EA-1535: Final Programmatic Environmental Assessment Uranium Leasing Program Office of Legacy Management (LM) is evaluating its Uranium Leasing Program to determine a strategy for ...

  4. Facility Environmental Vulnerability Assessment

    SciTech Connect (OSTI)

    Van Hoesen, S.D.

    2001-07-09

    From mid-April through the end of June 2001, a Facility Environmental Vulnerability Assessment (FEVA) was performed at Oak Ridge National Laboratory (ORNL). The primary goal of this FEVA was to establish an environmental vulnerability baseline at ORNL that could be used to support the Laboratory planning process and place environmental vulnerabilities in perspective. The information developed during the FEVA was intended to provide the basis for management to initiate immediate, near-term, and long-term actions to respond to the identified vulnerabilities. It was expected that further evaluation of the vulnerabilities identified during the FEVA could be carried out to support a more quantitative characterization of the sources, evaluation of contaminant pathways, and definition of risks. The FEVA was modeled after the Battelle-supported response to the problems identified at the High Flux Beam Reactor at Brookhaven National Laboratory. This FEVA report satisfies Corrective Action 3A1 contained in the Corrective Action Plan in Response to Independent Review of the High Flux Isotope Reactor Tritium Leak at the Oak Ridge National Laboratory, submitted to the Department of Energy (DOE) ORNL Site Office Manager on April 16, 2001. This assessment successfully achieved its primary goal as defined by Laboratory management. The assessment team was able to develop information about sources and pathway analyses although the following factors impacted the team's ability to provide additional quantitative information: the complexity and scope of the facilities, infrastructure, and programs; the significantly degraded physical condition of the facilities and infrastructure; the large number of known environmental vulnerabilities; the scope of legacy contamination issues [not currently addressed in the Environmental Management (EM) Program]; the lack of facility process and environmental pathway analysis performed by the accountable line management or facility owner; and poor

  5. EA-1207: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

  6. EA-1391: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Assessment for Presidential Permit Applications for Baja California, Inc. and Sempra Energy Resources

  7. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessments (EA) Environmental Assessments (EA) Environmental Assessments are concise public documents that a Federal agency prepares under NEPA to provide sufficient evidence and analysis to determine whether a proposed agency action would require preparation of an environmental impact statement or a finding of no significant impact. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD July 15, 2016

  8. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Processing | National Nuclear Security Administration | (NNSA) Room Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), has prepared this Environmental Assessment for Gap Material Plutonium - Transport, Receipt, and Processing to evaluate the potential environmental impacts associated with transporting plutonium from foreign nations to the United States, storing the

  9. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  10. EA-0372: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Standards for Consumer Products: Refrigerators, Furnaces and Television Sets including Environmental Assessment Regulatory Impact Analysis

  11. EA-1956: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

  12. Environmental Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments Environmental Assessments The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO's due diligence process for issuing a Department of Energy loan or loan guarantee. With the exception of a Record of Decision, the posting of these documents should not be construed as recommending a decision about the issuance of a loan or loan guarantee. Documents Available for Download November 6,

  13. Environmental Assessment Checklist (DOE, 1994) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist (DOE, 1994) Environmental Assessment Checklist (DOE, 1994) A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist ...

  14. Environmental Assessment Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Checklist Environmental Assessment Checklist A DOE checklist to assist EA preparers and reviewers. PDF icon Environmental Assessment Checklist More Documents &...

  15. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Silver Peak Area Geothermal Exploration Project Environmental Assessment, Esmeralda County, NV December 12, 2012 EA-1919: Draft Programmatic Environmental Assessment...

  16. Live Fire Range Environmental Assessment

    SciTech Connect (OSTI)

    1993-08-01

    The Central Training Academy (CTA) is a DOE Headquarters Organization located in Albuquerque, New Mexico, with the mission to effectively and efficiently educate and train personnel involved in the protection of vital national security interests of DOE. The CTA Live Fire Range (LFR), where most of the firearms and tactical training occurs, is a complex separate from the main campus. The purpose of the proposed action is to expand the LFR to allow more options of implementing required training. The Department of Energy has prepared this Environmental Assessment (EA) for the proposed construction and operation of an expanded Live Fire Range Facility at the Central Training Academy in Albuquerque, New Mexico. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  17. EA-1778: Draft Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    [Draft] Environmental Assessment for the [Supplemental] Proposed Rule, 10 CFR Part 433 and 10 CFR Part 435, “Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings"

  18. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado October 20, 2011 EA-1665: Final Environmental Assessment and...

  19. EA-1913: Preliminary Environmental Assessment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Preliminary Environmental Assessment EA-1913: Preliminary Environmental Assessment Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho This EA evaluates the ...

  20. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 21, 2014 EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon March 11, 2014 EA-1956: Draft Site-Wide Environmental Assessment...

  1. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment Sauk Valley Community College's Wind Energy Project, Dixon, Lee County, Illinois December 1, 2010 EA-1807: Final Environmental Assessment Heartland...

  2. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment Silver Peak Area Geothermal Exploration Project, Esmeralda County, NV October 1, 2012 EA-1863: Final Environmental Assessment Vegetation...

  3. EA-1951: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-005846: Categorical Exclusion Determination EA-1912: Draft Environmental Assessment EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA...

  4. Environmental assessment for the Processing and Environmental Technology Laboratory (PETL)

    SciTech Connect (OSTI)

    1995-09-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) on the proposed Processing and Environmental Technology Laboratory (PETC) at Sandia National Laboratories/New Mexico (SNL/NM). This facility is needed to integrate, consolidate, and enhance the materials science and materials process research and development (R&D) currently in progress at SNL/NM. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

  5. Recommendations for the Preparation of Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition This second edition of the "Green Book" was issued by DOE to ...

  6. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  7. Categorical Exclusion Determinations: Environmental Management | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE FOR DOWNLOAD October 13, 2011 CX-006923: Categorical Exclusion Determination Design and Install a Modification to the HB-Line Exhaust Fan Dampers CX(s) Applied: B2.5 Date: 10/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management October 13, 2011 CX-006920: Categorical Exclusion Determination Install

  8. Idaho DEQ Environmental Assessment Information | Open Energy...

    Open Energy Info (EERE)

    Assessment Information Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho DEQ Environmental Assessment Information Abstract This website provides an...

  9. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Campbell County Wind Farm, Campbell County, South Dakota July 9, 2014 EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho...

  10. Environmental Impact Statements and Environmental Assessments Status Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the status of ongoing NEPA documents at the Department of Energy, including the dates of important milestones in the NEPA process, links to the project pages, and references to more information (updated monthly). This chart represents anticipated activity and is not a commitment for documentation

  11. Environmental Assessment DOE/EA-1405

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    405 Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington U.S. Department of Energy Washington, D.C. March 2002 U.S. Department of Energy DOE/EA-1405 Environmental Assessment March 2002 This page intentionally left blank. DOE/EA-1405 U.S. Department of Energy Preface Environmental Assessment P-1 March 2002 PREFACE This environmental assessment was prepared to assess potential environmental impacts

  12. Categorical Exclusion Determinations: Environmental Management Consolidated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Service Center | Department of Energy Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued by Environmental Management Consolidated Business Service Center. DOCUMENTS AVAILABLE FOR DOWNLOAD No downloads found for this office.

  13. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  14. EA-2041: Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Environmental Assessment EA-2041: Environmental Assessment Cameron LNG Expansion Project The Federal Energy Regulatory Commission prepared an environmental assessment that examines the potential environmental impacts of a proposal to construct additional natural gas liquefaction and export facilities at the existing Cameron Liquefied Natural Gas Terminal in Cameron and Calcasieu Parishes, Louisiana. On July 15, 2016, DOE issued a FONSI adopting the EA by reference. For more information:

  15. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  16. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  17. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  18. EA-1008: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1008: Final Environmental Assessment EA-1008: Final Environmental Assessment Continued ... Environmental Assessment EA-1236: Finding of No Significant Impact EA-1956: Final

  19. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  20. Environmental Assessments | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Assessments DOE/EA-1976 Emera CNG, LLC, Compressed Natural Gas Project, Port of Palm Beach, City of Riviera Beach, Palm Beach County, FL Final Environmental Assessment (Oct 2015) Finding of No Significant Impact (Oct 2015) DOE/EA-1616A: National Carbon Capture Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, AL Final Environmental Assessment (Aug 2014) Finding of No Significant Impact (Aug 2014) DOE/EA-1616: Environmental Assessment for Proposed

  1. EA-1083: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    New Silt/Clay Source Development and Use at the Idaho National Engineering and Environmental Laboratory

  2. EA-0995: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Drum Storage Facility for Interim Storage of Materials Generated by Environmental Restoration Operations

  3. EA-1143: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Environmental Evaluation Notification Form for University of Nebraska Medical Center: Lied Transplant Center

  4. Environmental Assessment for the Terminal Expansion Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1985-02-01

    The Terminal Expansion Project is proposed by Bonneville Power Administration (BPA), Southern California Edison (SCE), and the Los Angeles Department of Water and Power (LADWP) to increase the operating capacity of the existing bipole direct current (dc) Intertie line between the Celilo Converter Station at The Dalles, Oregon, and the Sylmar converter Station at Sylmar, California. The proposal will allow a greater exchange of electric power between the Pacific Northwest (PNW) and Southern California without constructing new interregional transmission lines. By adding more alternating ac/dc converter equipment at the terminals, the conductors on the existing 845-mile dc intertie transmission line can be operated at full design capacity. The dc Intertie plus two other ac lines which terminate near San Francisco comprise the ''Intertie.'' Though the project is interregional, relatively little construction will be needed. This Environmental Assessment addresses the environmental impacts of the proposed actions and makes a determination as to their significance. Though LADWP is complying with the State environmental process, as required by the California Environmental Quality Act (CEQA), the impacts of their construction are being considered as part of the impacts of the overall proposal and are considered in the determination of significance.

  5. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the Sanford Underground Research Facility, Lead, South Dakota May 4, 2015 EA-1989: Draft Environmental Assessment Cliffrose Solar Energy Interconnection Project, Mohave...

  6. Independent Oversight Assessment, DOE Office of Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the evaluation was to provide information regarding the status of the safety culture within the Office of Environmental Management. The data collection phase of the assessment ...

  7. Public Involvement in the Environmental Assessment Process

    Broader source: Energy.gov [DOE]

    A DOE policy regarding the online publication and electronic notification of the availability of draft environmental assessments (EAs) for public comment.

  8. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  9. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 EA-1812: Finding of No Significant Impact Haxtun Wind Energy Project, Logan and Phillips Counties, CO January 20, 2012 EA-1812: Final Environmental Assessment Haxtun Wind...

  10. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 1, 2010 EA-1684: Final Environmental Assessment Construction And Operation Of The Facility For Rare Isotope Beams, Michigan State University, East Lansing, Michigan...

  11. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 29, 2011 EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric Drive Vehicle Battery and Component Manufacturing...

  12. Environmental Assessments (EA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Buildings August 3, 2015 EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas July 31, 2015 EA-2000: Draft...

  13. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Energy Savers [EERE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities ...

  14. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  15. EA-1974: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1974: Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Bonneville Power Administration ...

  16. EA-1764: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Spruce and Peatland Responses Under Climatic and Environmental Change Experiment (SPRUCE) Marcell Experimental Forest, Itasca County, Minnesota

  17. EA-1958: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Future Development in Proximity to the William R. Wiley Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland, Washington

  18. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  19. EA-1775: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1775: Final Environmental Assessment Texas A&M University Combined Heat and Power Project, College Station, Texas DOE prepared this Environmental ...

  20. EA-1262: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    62: Final Environmental Assessment EA-1262: Final Environmental Assessment McKay Bypass Canal Extension This EA evaluates the environmental impacts for the proposal to extend the ...

  1. EA-1541: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41: Final Environmental Assessment EA-1541: Final Environmental Assessment Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory This Environmental...

  2. EA-1917: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1917: Final Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates the potential environmental impacts of a ...

  3. EA-1736: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, New Mexico

  4. EA-1310: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Decontamination and Dismantlement of the Advanced Reactivity Measurement Facility and Coupled Fast Reactivity Measurements Facility at the Idaho National Engineering and Environmental Laboratory

  5. NEPA - Environmental Assessments - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ContractsProcurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental...

  6. Environmental Assessment Fact Sheet - Potential Impacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE has prepared a draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. It examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assessment also looks at the potential cumulative impacts of conducting experiments and operating the WIPP as a transuranic waste repository. This fact sheet presents

  7. Environmental Assessment Fact Sheet - Public Participation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    invites public comment on the draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. This document examines potential environmental consequences of conducting scientific experiments at the Waste Isolation Pilot Plant (WIPP). To facilitate public understanding of the proposed experiments and of the DOE's findings in the environmental assessment, the Carlsbad Field Office has scheduled two public meetings in New Mexico, one in Santa Fe and

  8. Environmental Assessment Kotzebue Wind Installation Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND

  9. Environmental Assessment Lakeview Geothermal Project

    SciTech Connect (OSTI)

    Treis, Tania

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  10. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 14, 2011 EA-1814: Final Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System July 13, 2011 EA-1871: Finding of No Significant Impact...

  11. ORISE: Environmental Assessment and Health Physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Assessments and Health Physics Performing environmental assessments and independent verification is essential to building public trust and confidence in radiological cleanup. As the U.S. Department of Energy (DOE) and other government agencies target contaminated sites across the country for decontamination and decommissioning, strict guidelines must be followed to ensure that property is effectively remediated before being released for public or private use. Through a combination

  12. EA-2011: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Proposed Release of Three Parasitoids for the Biological Control of the Emerald Ash Borer (Agrilus Planipennis) in the Continental United States The DOE Oak Ridge Office reviewed and adopted a July 2007 EA prepared by the USDA Animal and Plant Health Inspection Service that analyzed the potential environmental impacts of the release of three parasitoids into the continental U.S. for the biological control of the emerald ash borer, a nonnative invasive beetle.

  13. Risk communication in environmental assessment

    SciTech Connect (OSTI)

    Rahm-Crites, L.

    1996-08-26

    Since the enactment of NEPA and other environmental legislation, the concept of `risk communication` has expanded from simply providing citizens with scientific information about risk to exploring ways of making risk information genuinely meaningful to the public and facilitating public involvement in the very processes whereby risk is analyzed and managed. Contemporary risk communication efforts attempt to find more effective ways of conveying increasingly complex risk information and to develop more democratic and proactive approaches to community involvement, in particular to ensuring the participation of diverse populations in risk decisions. Although considerable progress has been made in a relatively short time, risk communication researchers and practitioners currently face a number of challenges in a time of high expectations, low trust, and low budgets.

  14. EA-1888: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1888: Final Environmental Assessment RSE Pulp & Chemical, LLC (Subsidiary of Red Shield Environmental, LLC) ITP Forest Products: Energy and Environmental Profile of the...

  15. EA-1506: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06: Final Environmental Assessment EA-1506: Final Environmental Assessment Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant The purpose of the ...

  16. EA-1955: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1955: Final Environmental Assessment Campbell County Wind Farm; Campbell County, South Dakota Western Area Power Administration (Western) issued a ...

  17. EA-1955: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1955: Draft Environmental Assessment Campbell County Wind Farm, Campbell County, South Dakota DOE's Western Area Power Administration (Western) ...

  18. EA-1870: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70: Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this...

  19. EA-1606: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1606: Final Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training, SC DOE prepared an environmental assessment to analyze the potential ...

  20. EA-1938: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1938: Final Environmental Assessment Grieve Unit CO2 Enhanced Recovery Project, Natrona County, WY The Bureau of Land Management prepared, with...

  1. EA-1862: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9...

  2. EA-1995: Draft Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Assessment EA-1995: Draft Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  3. EA-1995: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1995: Final Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  4. EA-1923: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  5. EA-1923: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  6. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products PDF icon ...

  7. EA-1772: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1772: Final Environmental Assessment Multipurpose Haul ... The U.S. Department of Energy (DOE) proposes to provide an alternative route, other than ...

  8. EA-1941: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1941: Draft Environmental Assessment Boyer-Tillamook ... The preliminary EA also considers a no action alternative where the improvements would not ...

  9. EA-1819: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1819: Final Environmental Assessment Kilowatts for Kenston Wind Energy Project, Chagrin Falls, Geauga County The Department of Energy has ...

  10. EA-1993: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas The proposed action ...

  11. EA-1975: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1975: Final Environmental Assessment Linac Coherent Light Source-IL, SLAC National Accelerator Laboratory, Menlo Park, California DOE issued a ...

  12. EA-1820: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20: Final Environmental Assessment EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio The U.S. Department of Energy (DOE) ...

  13. EA-1902: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Assessment EA-1902: Draft Environmental Assessment Northern Wind Project, Roberts County, South Dakota DOE's Western Area Power Administration issued a draft ...

  14. EA-1972: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  15. EA-1934: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1934: Draft Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA will evaluate the potential ...

  16. EA-1979: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1979: Draft Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a draft EA that ...

  17. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    39: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan ...

  18. EA-1979: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1979: Final Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a final EA that ...

  19. EA-1972: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1972: Final Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  20. EA-1891: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft EA to ...

  1. EA-1901: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA ...

  2. EA-1891: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration prepared an EA to ...

  3. EA-1973: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1973: Draft Environmental Assessment Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Bonneville Power Administration issued ...

  4. EA-1807: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Assessment EA-1807: Final Environmental Assessment Heartland Community College Wind Energy Project, Normal, McLean County, Illinois DOE has provided a State ...

  5. EA-1934: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1934: Final Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA evaluates the potential ...

  6. EA-1931: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power ...

  7. EA-1800: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1800: Final Environmental Assessment Monarch Warren County Wind Turbine Project The U.S. Department of Energy (DOE) has provided Federal funding...

  8. EA-1860: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 92...

  9. EA-1906: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1906: Final Environmental Assessment Operations, Upgrades, and Consolidation at the Western Command Site, NM This NNSA EA evaluates the potential...

  10. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  11. EA-1593: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1593: Final Environmental Assessment Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject The National Nuclear...

  12. EA-1960: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  13. EA-1826: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1826: Final Environmental Assessment AV Solar Ranch One Project, Los Angeles and Kern Counties, California The U.S. Department of Energy (DOE) is...

  14. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  15. EA-1728: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington For more information, contact: Mr....

  16. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  17. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  18. EA-1510: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Assessment EA-1510: Final Environmental Assessment Alternate Financed Facility Modernization The purpose of the Proposed Action is to transfer two parcels of...

  19. EA-1905: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) For more...

  20. EA-1960: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  1. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  2. EA-1889: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the...

  3. EA-1829: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA...

  4. EA-1602: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Assessment EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water...

  5. EA-1884: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO DOE's Western Area...

  6. EA-1966: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1966: Draft Environmental Assessment Sunflower Wind Project, Hebron, North Dakota Western Area Power Administration issued a Draft EA that...

  7. EA-1870: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1870: Final Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The U.S. Department of Energy (DOE) prepared this...

  8. EA-1952: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1952: Final Environmental Assessment Lane-Wendson No. 1 ... More Documents & Publications EA-1952: Finding of No Significant Impact EA-1952: Draft

  9. EA-1922: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a ... EA-1922: Draft Environmental Assessment EA-1922: Finding of No Significant Impact

  10. EA-1818: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Assessment EA-1818: Final Environmental Assessment Pettisville ... More Documents & Publications EA-1818: Finding of No Significant Impact EA-1820: Final ...

  11. EA-1855: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOEEA-4406) This EA evaluates...

  12. EA-1855: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission...

  13. Policy Flash 2014-19 Electronic Products Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electronic Products Environmental Assessment Tool (EPEAT) Policy Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT) Questions concerning this policy flash...

  14. EA-1932: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

  15. EA-1651: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1651: Finding of No Significant Impact EA-1574: Final Environmental Assessment EA-1488: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and ...

  16. EA-1809: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

  17. EA-1917: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable ...

  18. EA-1984: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory This Final EA evaluates the impacts of...

  19. EA-1984: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1984: Draft Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory, Idaho DOE has prepared a draft EA to...

  20. EA-1440-S2: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1968: Final Site-Wide Environmental Assessment EA-1887: Supplemental Environmental Assessment EA-1573-S1: Proposed Renewable Fuel Heat Plant Improvements at the National ...

  1. Setting boundaries of participation in environmental impact assessment

    SciTech Connect (OSTI)

    Salomons, Geoffrey H.; Hoberg, George

    2014-02-15

    Public participation processes are touted as an effective way to increase the capacity and legitimacy of environmental assessment and the regulatory process that rely on them. Recent changes to the Canadian environmental assessment process narrowed the criteria for who can participate in environmental assessments from any who were interested to those who were most directly affected. This article examines the potential consequences of this change by exploring other areas of Canadian regulatory law where a similar directed affected test has been applied. This new standard risks institutionalizing the long-understood representational bias confronted by more diffuse interest like environmental protection. Restricting participation to the directly affected is far too narrow a test for processes like environmental assessment that are designed to determine the public interest. -- Highlights: Public participation can improve the legitimacy of environmental assessments. New Canadian rules narrow the range of eligible participants. Similar rules in Alberta have excluded environmental representation. The new rules may institutionalize bias against more diffuse interests. Restricting participation to the directly affected is far too narrow.

  2. Environmental assessment of stillage control

    SciTech Connect (OSTI)

    Barney, W.K.; Chang, H.

    1980-01-01

    The US government is encouraging increased production and use of gasohol in an effort to make the United States more energy independent. The current national goal is to substitute gasohol for 10% of the unleaded gasoline consumed in the United States by th end of 1980. Increased production of fuel ethanol in the years to come seems certain. In producing fuel ethanol (200 proof) from biomass feedstocks by fermentation, a liquid residue called stillage is produced. The concentration of BOD/sub 5/ in stillage is usually high compared to that in domestic waste, and this residue must go through a waste treatment process before discharge into bodies of water. While stillage has potential uses as an animal feed, soil amendment, and protein source for humans, the liquid remaining after useful stillage components have been extracted must still be treated before discharge to the environment. This paper identifies the types of stillage that are produced as well as their control. The concept of stillage control in the context of this paper includes both the uses and environmental control technology needs of stillage.

  3. Integrating environmental justice (EJ) methodologies into environmental impact assessment

    SciTech Connect (OSTI)

    Zimmerman, R.

    1995-12-01

    Environmental Justice (EJ) concerns are now a pervasive part of environmental policy. Moreover, Federal Executive Order 12898 mandates its diffusion throughout federal government programs, and many states are developing similar programs. EJ concerns first arose in the environmental field in the context of hazardous waste facilities. Thus, hazardous waste applications provide important analytical models for EJ issues addressed in other programs, such as environmental assessment (EA). At the present time, EJ concerns are treated largely qualitatively in EAs and environmental impact statements (EISs) in sections dealing with neighborhood and community character or socioeconomics. The manner in which EJ issues are examined in EISs is described using examples from recent EISs, and an approach to quantifying EJ in terms of demographic patterns is presented using techniques previously applied by the author to hazardous waste sites (primarily sites on the National Priorities List under the Superfund program). Various geographic levels and demographic parameters are discussed and compared. A key point is the manner in which the choice of a comparison area influences conclusions about a particular area. these methods are critical in addressing such issues as whether proposed projects are being located in areas with relatively greater proportions of {open_quotes}vulnerable{close_quotes} populations or, in the case of public service projects, how these populations are served relative to other populations by the facilities that are the subject of the assessment.

  4. Lake Erie Connector Project Environmental Assessment Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume 1 - Main Document U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington DC June 2016 Cover Photo Credits http://www.itclakeerieconnector.com/ DRAFT LAKE ERIE CONNECTOR PROJECT ENVIRONMENTAL ASSESSMENT Volume 1-Main Document DOE/EA-2019 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY COOPERATING AGENCY U.S. ARMY CORPS OF ENGINEERS This Page Intentionally Left Blank Lake Erie Connector Project Draft Environmental

  5. Oklahoma State University proposed Advanced Technology Research Center. Environmental Assessment

    SciTech Connect (OSTI)

    1995-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) evaluating the construction and equipping of the proposed Advanced Technology Research Center (ATRC) at Oklahoma State University (OSU) in Stillwater, Oklahoma. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

  6. Environmental assessment: Richton Dome Site, Mississippi

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines.

  7. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high- level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of the five sites suitable for characterization.

  8. Environmental assessment: Richton Dome site, Mississippi

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Richton Dome site in Mississippi as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Richton Dome site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. The site is in the Gulf interior region, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains two other potentially acceptable sites--the Cypress Creek Dome site in Mississippi and the Vacherie Dome site in Louisiana. Although the Cypress Creek Dome and the Vacherie Dome sites are suitable for site characterization, the DOE has concluded that the Richton Dome site is the preferred site in the Gulf interior region. On the basis of the evaluations reported in this EA, the DOE has found that the Richton Dome site is not disqualified under the guidelines.

  9. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization.

  10. Road ecology in environmental impact assessment

    SciTech Connect (OSTI)

    Karlson, Mårten Mörtberg, Ulla Balfors, Berit

    2014-09-15

    Transport infrastructure has a wide array of effects on terrestrial and aquatic ecosystems, and road and railway networks are increasingly being associated with a loss of biodiversity worldwide. Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are two legal frameworks that concern physical planning, with the potential to identify, predict, mitigate and/or compensate transport infrastructure effects with negative impacts on biodiversity. The aim of this study was to review the treatment of ecological impacts in environmental assessment of transport infrastructure plans and projects. A literature review on the topic of EIA, SEA, biodiversity and transport infrastructure was conducted, and 17 problem categories on the treatment of biodiversity were formulated by means of a content analysis. A review of environmental impact statements and environmental reports (EIS/ER) produced between 2005 and 2013 in Sweden and the UK was then conducted using the list of problems as a checklist. The results show that the treatment of ecological impacts has improved substantially over the years, but that some impacts remain problematic; the treatment of fragmentation, the absence of quantitative analysis and that the impact assessment study area was in general delimited without consideration for the scales of ecological processes. Actions to improve the treatment of ecological impacts could include improved guidelines for spatial and temporal delimitation, and the establishment of a quantitative framework including tools, methods and threshold values. Additionally, capacity building and further method development of EIA and SEA friendly spatial ecological models can aid in clarifying the costs as well as the benefits in development/biodiversity tradeoffs. - Highlights: • The treatment of ecological impacts in EIA and SEA has improved. • Quantitative methods for ecological impact assessment were rarely used • Fragmentation effects were recognized

  11. Radiological risk assessment of environmental radon

    SciTech Connect (OSTI)

    Khalid, Norafatin; Majid, Amran Ab; Yahaya, Redzuwan; Yasir, Muhammad Samudi

    2013-11-27

    Measurements of radon gas ({sup 222}Rn) in the environmental are important to assess indoor air quality and to study the potential risk to human health. Generally known that exposure to radon is considered the second leading cause of lung cancer after smoking. The environmental radon concentration depends on the {sup 226}Ra concentration, indoor atmosphere, cracking on rocks and building materials. This study was carried out to determine the indoor radon concentration from selected samples of tin tailings (amang) and building materials in an airtight sealed homemade radon chamber. The radiological risk assessment for radon gas was also calculated based on the annual exposure dose, effective dose equivalent, radon exhalation rates and fatal cancer risk. The continuous radon monitor Sun Nuclear model 1029 was used to measure the radon concentration emanates from selected samples for 96 hours. Five types of tin tailings collected from Kampar, Perak and four samples of building materials commonly used in Malaysia dwellings or building constructions were analysed for radon concentration. The indoor radon concentration determined in ilmenite, monazite, struverite, xenotime and zircon samples varies from 219.6 76.8 Bq m{sup ?3} to 571.1 251.4 Bq m{sup ?3}, 101.0 41.0 Bq m{sup ?3} to 245.3 100.2 Bq m{sup ?3}, 53.1 7.5 Bq m{sup ?3} to 181.8 9.7 Bq m{sup ?3}, 256.1 59.3 Bq m{sup ?3} to 652.2 222.2 Bq m{sup ?3} and 164.5 75.9 Bq m{sup ?3} to 653.3 240.0 Bq m{sup ?3}, respectively. Whereas, in the building materials, the radon concentration from cement brick, red-clay brick, gravel aggregate and cement showed 396.3 194.3 Bq m{sup ?3}, 192.1 75.4 Bq m{sup ?3}, 176.1 85.9 Bq m{sup ?3} and 28.4 5.7 Bq m{sup ?3}, respectively. The radon concentration in tin tailings and building materials were found to be much higher in xenotime and cement brick samples than others. All samples in tin tailings were exceeded the action level for radon gas of 148 Bq m

  12. ENVIRONMENTAL ASSESSMENT FOR OTEC PILOT PLANTS

    SciTech Connect (OSTI)

    Wilde, P.

    1980-06-01

    Logical and orderly progression of the OTEC program from conceptual designs through component testing to the goal of commercially viable OTEC plants require that the socio-legal requirements be met and the proper operating permits be obtained and maintained. This function is accomplished in a series of activities including: (1) Development and annual revision of a published OTEC Environmental Development Plan (EDP); (2) Compliance with NEPA/EPA and other regulatory requirements; and (3) Studies and research in support of the above. The Environmental Development Plan (EDP) lists the concerns, outlines the program to consider the effects and validity of such concerns on the OTEC program, and gives the time-table to meet the schedule, integrated with that of the engineering and design programs. The schedules of compliance activities and, to a lesser degree, research also are governed by the development progress of the technology. However, because of the lead time necessary to insure proper review the appropriate regulatory agencies, the environmental assessment program for the OTEC pilot plants (initially starting with the 10/40 MWe unit) is founded on the strategy of progressive improvement of previously accepted documentation. Based on experience with OTEC-1, the procedure for pilot plants will be: (1) Produce generic Environmental Assessment (EA) at the appropriate level of technology in advance of hardware contract; (2) Produce generic Environmental Impact Statement (EIS) at approximately the same time as the hardware procurement; (3) Monitor production of site specific supplement to the generic EIS prepared by the hardware contractor; (4) Assist pilot plant operator in applying and obtaining permits by providing current research and modeling data; (5) Monitor environmental program as required by regulatory agency; and (6) Use new site data for refining models for future pilot plant. assessments.

  13. Environmental assessment: special isotope separation process selection

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Environmental Assessment (EA) evaluates the differences in potential environmental impacts between two plutonium Special Isotope Separation (SIS) technologies: Atomic Vapor Laser Isotope Separation (AVLIS) and Molecular Laser Isotope Separation (MLIS). Both SIS technologies use PuO/sub 2/ as feed; AVLIS converts feed to plutonium metal and MLIS converts feed to PuF/sub 6/. The AVLIS process uses laser energy to selectively photoionize and electrostatically separate plutonium isotopes from an atomic vapor stream. The MLIS process uses laser energy to selectively disassociate specific isotopes of plutonium in the form of PuF/sub 6/ molecules to create PuF/sub 5/ for collection and further processing. Both processes produce plutonium metal as their product. An evaluation of differences in potential environmental impacts attributed to the construction of an SIS facility, based on either technology, included a comparison of construction materials, land areas required, and the size of the design and construction workforce. The differences in potential environmental impacts from operating an SIS facility were also compared. No large differences in potential environmental impacts would be expected from the use of process chemicals. An AVLIS or an MLIS facility would produce operating effluents that would meet all applicable radiation, chemical, and hazardous waste standards and would be constructed to protect workers, the public and the environment. This EA has not revealed any significant differences in the potential environmental impacts that could occur as a result of deploying either the AVLIS or the MLIS Special Isotope Separation technology.

  14. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  15. Boise geothermal injection well: Final environmental assessment

    SciTech Connect (OSTI)

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  16. Environmental assessment, Richton Dome site, Mississippi (US)

    SciTech Connect (OSTI)

    none,

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC Sections 10101-10226) requires the environmental assessment of a potential site to include a statement of the basis for the nomination of a site as suitable for characterization. Volume 2 of this environmental assessment provides a detailed evaluation of the Richton Dome Site and its suitability as the site for a radioactive waste disposal facility under DOE siting guidelines, as well as a comparison of the Richton Dome site with other proposed sites. Evaluation of the Richton Dome site is based on the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The comparative evaluation of proposed sites is required under DOE guidelines, but is not intended to directly support the subsequent recommendation of three sites for characterization as candidate sites. 428 refs., 24 figs., 62 tabs. (MHB)

  17. FINAL ENVIRONMENTAL ASSESSMENT FOR A COMBINED POWER AND BIOMASS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA Environmental Assessment EFH Essential Fish Habitat EO Executive Order F Degrees ... Environmental Protection Agency USFWS U.S. Fish and Wildlife Service gm 3 microgram per ...

  18. EA-1115: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1115: Final Environmental Assessment Liquid Waste Treatment at the Nevada Test Site, Nye County, Nevada This EA evaluates the environmental impacts of the proposal to treat ...

  19. EA-1338: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership This EA evaluates the environmental impacts for the proposed ...

  20. DOE/EA-1494 Final Environmental Assessment for Activities Using

    National Nuclear Security Administration (NNSA)

    ... 1993. Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements ("Green Book"), U.S. Department of Energy, Office of NEPA Oversight. ...

  1. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    SciTech Connect (OSTI)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  2. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs.

  3. [Environmental Hazards Assessment Program annual report, June 1992--June 1993]. Results of the environmental health activities and needs assessment of the South Carolina statewide family practice system for the Environmental Hazards Assessment Program: EHAP Volume 1, No. 1

    SciTech Connect (OSTI)

    Musham, C.; Hainer, B.

    1993-05-01

    An activities and needs assessment was conducted to determine what each of the seven family practice residency programs in South Carolina is providing in environmental health education. In addition, this study was designed to determine: what are the barriers to greater emphasis on environmental health in family practice residency programs and, what the basic environmental health educational goals for family practice residency programs should be.

  4. The Environmental Assessment Management modification of CADET

    Energy Science and Technology Software Center (OSTI)

    1996-05-01

    The original CADET system (finalized in September 1995 as version 1.3) is a data collection and transfer system developed for the Headquarters Air Force Space Command (HQAFSPC) Environmental Compliance Assessment and Management Program (ECAMP). The system was designed as a tool for ECAMP evaluators to use to enter compliance related data while in the field and to subsequently store, modify, sort, query, and print the data and to electronically transfer the data into the Airmore » Force''s Work Information Management System Environmental Subsystem (WIMSES). The original CADET system was designed to match the database structure of the WIMSES ECAMP module that came on-line in 1992. In June 1995, the Department of Defense issued The Environmental Assessment Management (TEAM) Guide and ECAMP Supplement to the TEAM Guide. These included changes to the type and amount of data collected during an ECAMP assessment. The WIMSES database structure was not modified to match the TEAM Guide; however, the need for collecting and storing the ECAMP data remained. The HQAFSC decided to modify the CADET system to incorporate the changes specified in the ECAMP Supplement and to convert the system from simply a data entry and transfer tool to a data entry and storage system to manage ECAMP findings in lieu of the WIMSES ECAMP module. The revised software is designated as version 2.0 and nicknamed TEAM CADET to distinguish it from the original CADET system.« less

  5. Listed waste determination report. Environmental characterization

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    On September 23, 1988, the US Environmental Protection Agency (EPA) published a notice clarifying interim status requirements for the management of radioactive mixed waste thereby subjecting the Idaho National Engineering Laboratory (INEL) and other applicable Department of Energy (DOE) sites to regulation under the Resource Conservation and Recovery Act (RCRA). Therefore, the DOE was required to submit a Part A Permit application for each treatment, storage, and disposal (TSD) unit within the INEL, defining the waste codes and processes to be regulated under RCRA. The September 1990 revised Part A Permit application, that was approved by the State of Idaho identified 101 potential acute and toxic hazardous waste codes (F-, P-, and U- listed wastes according to 40 CFR 261.31 and 40 CFR 261.33) for some TSD units at the Idaho Chemical Processing Plant. Most of these waste were assumed to have been introduced into the High-level Liquid Waste TSD units via laboratory drains connected to the Process Equipment Waste (PEW) evaporator (PEW system). At that time, a detailed and systematic evaluation of hazardous chemical use and disposal practices had not been conducted to determine if F-, P-, or Unlisted waste had been disposed to the PEW system. The purpose of this investigation was to perform a systematic and detailed evaluation of the use and disposal of the 101 F-, P-, and Unlisted chemicals found in the approved September 1990 Part A Permit application. This investigation was aimed at determining which listed wastes, as defined in 40 CFR 261.31 (F-listed) and 261.33 (P & Unlisted) were discharged to the PEW system. Results of this investigation will be used to support revisions to the RCRA Part A Permit application.

  6. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  7. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products This March 28, ...

  8. Environmental assessment: South microwave communication facilities

    SciTech Connect (OSTI)

    Not Available

    1989-06-01

    Western Area Power Administration (Western) is proposing to construct, operate, and maintain eight microwave repeater stations in southwestern Colorado, southeastern Utah, and northern Arizona, in order to meet the minimum fade criteria established by the Western Systems Coordinating Council (WSCC) for the operation and protection of electric power systems. The proposed microwave facilities would increase the reliability of communication. This environmental assessment (EA) describes the existing environmental conditions and the impacts from construction of the eight microwave communication facilities. The EA was prepared in compliance with the National Environmental Policy Act of 1969, the Council on Environmental Quality Regulations (40 CFR 1500-1508), and the Department of Energy Guidelines (52 FR 47662, December 15, 1987). The proposed project would consist of constructing eight microwave facilities, each of which would include a self-supported lattice tower, an equipment building, a propane tank, distribution lines to provide electric power to the sites, and access roads to the sites. The facilities would be constructed in San Miguel and Montezuma Counties in Colorado, San Juan County, Utah, and Navajo, Apache, Coconino, and Yavapai Counties in Arizona. 20 refs., 2 figs., 2 tabs.

  9. EA-1963: Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1963: Notice of Intent to Prepare an Environmental Assessment Elba Liquefaction Project, Savannah, Georgia The Federal Energy Regulatory Commission (FERC) is...

  10. Nuclear Risk Assessment for the Mars 2020 Mission Environmental...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Nuclear Risk Assessment for the Mars 2020 Mission Environmental Impact Statement Citation Details In-Document Search Title: Nuclear Risk Assessment for the Mars ...

  11. EA-1956: Site-Wide Environmental Assessment for the Divestiture...

    Office of Environmental Management (EM)

    Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming EA-1956: Site-Wide Environmental Assessment...

  12. EA-1917: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for the...

  13. EA-1907: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1907: Final Environmental Assessment Western Plains Energy, LLC Biogas Anaerobic Digester Facility, Oakley, Kansas For more information, contact: Ms. Melissa...

  14. EA-1849-S-1: Draft Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1849-S-1: Draft Supplemental Environmental Assessment Tuscarora Phase II Generating Facility, Elko County, Nevada This SEA provides additional information...

  15. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect (OSTI)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  16. OCEAN THERMAL ENERGY CONVERSION PROGRAMMATIC ENVIRONMENTAL ASSESSMENT

    SciTech Connect (OSTI)

    Sands, M.Dale

    1980-08-01

    Significant achievements in Ocean Thermal Energy Conversion (OTEC) technology have increased the probability of producing OTEC-derived power in this decade with subsequent large-scale commercialization to follow by the turn of the century. Under U.S. Department of Energy funding, Interstate Electronics has prepared an OTEC Programmatic Environmental Assessment (EA) that considers tne development, demonstration, and commercialization of OTEC power systems. The EA considers several tecnnological designs (open cycle and closed cycle), plant configurations (land-based, moored, and plantship), and power usages (baseload electricity and production of ammonia and aluminum). Potencial environmental impacts, health and safety issues, and a status update of international, federal, and state plans and policies, as they may influence OTEC deployments, are included.

  17. EA-1914: Notice of Scoping of an Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, Colorado

  18. EA-1914: Draft Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, Colorado

  19. Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Document details a the draft environmental assessment for proposed rule 10 CFR Part 433, Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings Download the draft environmental assessment for proposed rule

  20. EA-1914: Final Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) National Wind Technology Center (NWTC) Site-Wide Environmental Assessment, Golden, Colorado

  1. EA-1611-S1: Final Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a final supplemental...

  2. EA-1968: Final Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Renewable Energy Laboratory (NREL) South Table Mountain (STM) Campus Site-Wide Environmental Assessment, Golden, Colorado

  3. Biomass Gasifier Facility (BGF). Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The Pacific International Center for High Technology Research (PICHTR) is planning, to design, construct and operate a Biomass Gasifier Facility (BGF). This facility will be located on a site easement near the Hawaiian Commercial & Sugar company (KC&S) Paia Sugar Factory on Maui, Hawaii. The proposed BGF Project is a scale-up facility, intended to demonstrate the technical and economic feasibility of emerging biomass gasification technology for commercialization. This Executive Summary summarizes the uses of this Environmental Assessment, the purpose and need for the project, project,description, and project alternatives.

  4. Environmental Risk Assessment | Department of Energy

    Energy Savers [EERE]

    Justice Documents Environmental Justice Documents Fiscal Year 2015 Annual Environmental Justice Implementation Progress Report (May 2016) Environmental Justice Five-Year Implementation Plan - Third and Fourth Annual Progress Reports (December 2013) Environmental Justice Five-Year Implementation Plan - Second Annual Progress Report (August 2011) Environmental Justice Five-Year Implementation Plan First Annual Progress Report (December 2009) Environmental Justice Five-Year Implementation Plan

  5. Environmental assessment for radioisotope heat source fuel processing and fabrication

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    DOE has prepared an Environmental Assessment (EA) for radioisotope heat source fuel processing and fabrication involving existing facilities at the Savannah River Site (SRS) near Aiken, South Carolina and the Los Alamos National Laboratory (LANL) near Los Alamos, New Mexico. The proposed action is needed to provide Radioisotope Thermoelectric Generators (RTG) to support the National Aeronautics and Space Administration's (NASA) CRAF and Cassini Missions. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, an Environmental Impact Statement is not required. 30 refs., 5 figs.

  6. Recommendations for the Preparation of Environmental Assessments and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements Second Edition (DOE, 2004) | Department of Energy Preparation of Environmental Assessments and Environmental Impact Statements Second Edition (DOE, 2004) Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements Second Edition (DOE, 2004) This second edition of the "Green Book" was issued by DOE to assist preparers and reviewers of NEPA documents, with the goal of promoting clarity, accuracy, and consistency

  7. EA-2024: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2024: Final Environmental Assessment Gap Material Plutonium - Transport, Receipt, and Processing The U.S. Department of Energy, National Nuclear Security Administration, has prepared this environmental assessment to evaluate the potential environmental impacts associated with transporting up to 900 kilograms of plutonium from foreign nations to the United States, storing the plutonium at the Savannah River Site in South Carolina, and processing it for

  8. EA-2021: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-2021: Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11) Section 413 of the Energy Independence and Security Act of 2007 (EISA) directs DOE to establish energy conservation standards for manufactured housing. This Draft Environmental Assessment and Request for Information on Impacts to Indoor Air Quality evaluates the potential environmental impacts of establishing energy conservation standards for manufactured

  9. Independent Oversight Assessment, DOE Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters - November 2012 | Department of Energy DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture at the Department of Energy's (DOE) Office of Environmental

  10. Environmental Management Assessment of the National Renewable Energy Laboratory (NREL)

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    This report documents the results of the environmental management assessment performed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. The onsite portion of the assessment was conducted from September 14 through September 27, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). During this assessment, the activities conducted by the assessment team included reviews of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and NREL contractor personnel; and inspections and observations of selected facilities and operations. The environmental management assessment of NREL focused on the adequacy of environmental management systems and assessed the formality of programs employing an approach that recognizes the level of formality implementing environmental programs may vary commensurate with non-nuclear research and development operations. The Assessment Team evaluated environmental monitoring, waste management and National Environmental Policy Act (NEPA) activities at NREL, from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section of this report. The scope of the NREL Environmental Management Assessment was comprehensive and included all areas of environmental management. At the same time, environmental monitoring, waste management, and NEPA activities were evaluated to develop a programmatic understanding of these environmental disciplines, building upon the results of previous appraisals, audits, and reviews performed at the NREL.

  11. Office of Nuclear Safety and Environmental Assessments | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Nuclear Safety and Environmental Assessments Office of Nuclear Safety and Environmental Assessments MISSION The Office of Nuclear Safety and Environmental Assessments conducts assessments to provide critical feedback and objective information on programs and performance in protecting our workers, the public and environment from radiological hazards with a focus on hazardous nuclear facilities and operations.This information provides assurance to our stakeholders and identifies areas

  12. Determining the appropriate scope: Assessing at the ecosystem level

    SciTech Connect (OSTI)

    Southerland, M.T.

    1995-12-01

    Traditional approaches to determining the scope of environmental impact assessment have been based on an ad hoc selection of issues by the project proponent and other interested parties. Resulting in an inadequate consideration of both cumulative effects and impacts on biodiversity. Although public involvement in scoping the assessment must by resource-oriented, rather than activity-oriented, the appropriate scope of environmental impact assessment is the ecosystem. Drawing from the Council on Environmental Quality (CEQ) guidance on the consideration of biodiversity under the National Environmental Policy Act (NEPA) and the growing consensus on principles of ecosystem management, scoping should begin with the large-scale ecosystem focusing on essential components potentially affected by the project to determine the appropriate bounds for the study. Although the science of analyzing ecosystems has many limitation, progress in improving environmental impact assessment can be made at any of the three increasingly difficult steps in assessing at the ecosystem level: (1) The first step involves bounding the assessment within the regional context to address cumulative effects and biodiversity. The adoption of a landscape scale has proven to be the most effective solution to the problems of setting boundaries for study units in time and space that do not omit important sources, endpoints (indicators), or processes. (2) The second step involves the use of higher-level indicators to characterize biodiversity and ecosystem integrity. Useful measures include community indices of biological integrity and landscape parameters such as habitat composition and fragmentation. (3) The third step involves identifying ecosystem thresholds (i.e., carrying capacities) to analyze the significance of cumulative impacts. Trends analysis can help identify potential threshold effects when process models are not available.

  13. Environmental assessment, Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)

  14. The paradox of strategic environmental assessment

    SciTech Connect (OSTI)

    Bidstrup, Morten Hansen, Anne Merrild

    2014-07-01

    Strategic Environmental Assessment (SEA) is a tool that can facilitate sustainable development and improve decision-making by introducing environmental concern early in planning processes. However, various international studies conclude that current planning practice is not taking full advantage of the tool, and we therefore define the paradox of SEA as the methodological ambiguity of non-strategic SEA. This article explores causality through at three-step case study on aggregates extraction planning in Denmark, which consists of a document analysis; a questionnaire survey and follow-up communication with key planners. Though the environmental reports on one hand largely lack strategic considerations, practitioners express an inherent will for strategy and reveal that their SEAs in fact have been an integrated part of the planning process. Institutional context is found to be the most significant barrier for a strategy and this suggests that non-strategic planning setups can prove more important than non-strategic planning in SEA practice. Planners may try to execute strategy within the confinements of SEA-restricted planning contexts; however, such efforts can be overlooked if evaluated by a narrow criterion for strategy formation. Consequently, the paradox may also spark from challenged documentation. These findings contribute to the common understanding of SEA quality; however, further research is needed on how to communicate and influence the strategic options which arguably remain inside non-strategic planning realities. - Highlights: International studies conclude that SEAs are not strategic. = The paradox of SEA. Even on the highest managerial level, some contexts do not leave room for strategy. Non-strategic SEA can derive from challenged documentation. Descriptive and emergent strategy formation can, in practice, be deemed non-strategic.

  15. Transmission line environmental assessment guidance document

    SciTech Connect (OSTI)

    Jackson, J.; Pentecost, E.; Muzzarelli, J.

    1994-01-01

    Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

  16. Draft Environmental Assessment: Sand Point Wind Installation...

    Energy Savers [EERE]

    1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT ... 1 and 2. Figure 2-4. TDX electrical integration schematic ... Environmental Quality CFR Code of Federal Regulations CO 2 ...

  17. Strategic environmental assessment can help solve environmental impact assessment failures in developing countries

    SciTech Connect (OSTI)

    Alshuwaikhat, Habib M. . E-mail: habibms@kfupm.edu.sa

    2005-05-15

    The current trend of industrialization and urbanization in developing nations has a huge impact on anthropogenic and natural ecosystems. Pollution sources increase with the expansion of cities and cause contamination of water, air and soil. The absence of urban environmental planning and management strategies has resulted in greater concern for future urban development. This paper advocates the adoption of strategic environmental assessment (SEA) as a means to achieve sustainable development in developing countries. It investigates project-level environmental impact assessment (EIA) and its limitations. The exploration of SEA and its features are addressed. The effective implementation of SEA can create a roadmap for sustainable development. In many developing countries, the lack of transparency and accountability and ineffective public participation in the development of the policy, plan and program (PPP) would be mitigated by the SEA process. Moreover, the proactive and broadly based characteristics of SEA would benefit the institutional development of the PPP process, which is rarely experienced in many developing countries. The paper also explores the prospects for SEA and its guiding principles in developing countries. Finally, the paper calls for a coordinated effort between all government, nongovernment and international organizations involved with PPPs to enable developing countries to pursue a path of sustainable development through the development and application of strategic environmental assessment.

  18. Ross Hazardous and Toxic Materials Handling Facility: Environmental Assessment.

    SciTech Connect (OSTI)

    URS Consultants, Inc.

    1992-06-01

    The Bonneville Power Administration (BPA) owns a 200-acre facility in Washington State known as the Ross Complex. Activities at the Ross Complex routinely involve handling toxic substances such as oil-filled electrical equipment containing polychlorinated biphenyls (PCBs), organic and inorganic compounds for preserving wood transmission poles, and paints, solvents, waste oils, and pesticides and herbicides. Hazardous waste management is a common activity on-site, and hazardous and toxic substances are often generated from these and off-site activities. The subject of this environmental assessment (EA) concerns the consolidation of hazardous and toxic substances handling at the Complex. This environmental assessment has been developed to identify the potential environmental impacts of the construction and operation of the proposal. It has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) to determine if the proposed action is likely to have a significant impact on the environment. In addition to the design elements included within the project, mitigation measures have been identified within various sections that are now incorporated within the project. This facility would be designed to improve the current waste handling practices and to assist BPA in meeting Federal and state regulations.

  19. Environmental Assessment Radioactive Source Recovery Program

    SciTech Connect (OSTI)

    1995-12-20

    In a response to potential risks to public health and safety, the U.S. Department of Energy (DOE) is evaluating the recovery of sealed neutron sources under the Radioactive Source Recovery Program (RSRP). This proposed program would enhance the DOE`s and the U.S. Nuclear Regulatory Commission`s (NRC`s) joint capabilities in the safe management of commercially held radioactive source materials. Currently there are no federal or commercial options for the recovery, storage, or disposal of sealed neutron sources. This Environmental Assessment (EA) analyzes the potential environmental impacts that would be expected to occur if the DOE were to implement a program for the receipt and recovery at the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico, of unwanted and excess plutonium-beryllium ({sup 238}Pu-Be) and americium-beryllium ({sup 241}Am-Be) sealed neutron sources. About 1 kg (2.2 lb) plutonium and 3 kg (6.6 lb) americium would be recovered over a 15-year project. Personnel at LANL would receive neutron sources from companies, universities, source brokers, and government agencies across the country. These neutron sources would be temporarily stored in floor holes at the CMR Hot Cell Facility. Recovery reduces the neutron emissions from the source material and refers to a process by which: (1) the stainless steel cladding is removed from the neutron source material, (2) the mixture of the radioactive material (Pu-238 or Am-241) and beryllium that constitutes the neutron source material is chemically separated (recovered), and (3) the recovered Pu-238 or Am-241 is converted to an oxide form ({sup 238}PuO{sub 2} or {sup 241}AmO{sub 2}). The proposed action would include placing the {sup 238}PuO{sub 2} or {sup 241}AmO{sub 2} in interim storage in a special nuclear material vault at the LANL Plutonium Facility.

  20. DOE to Hold Public Meetings On Draft Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE to Hold Public Meetings On Draft Environmental Assessment Carlsbad, N.M., October 26, 2000 - The public is invited to comment on a draft environmental assessment for conducting astrophysics and other basic scientific experiments at the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP). The October 23 release of the draft environmental assessment begins a formal review process that includes a 30-day public comment period and two separate public information meetings. Public

  1. EA-2022: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2022: Final Environmental Assessment The Bureau of Reclamation, with Western Area Power Administration as a cooperating agency, issued a final EA that assesses the potential environmental impacts of a proposal to develop a 9.4 megawatt hydroelectric project at the existing Helena Valley Pumping Plant site at Canyon Ferry Dam on the Missouri River near Helena, Montana. The new hydropower generator would interconnect to Western's transmission system at an existing

  2. EA-1880: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Availability of a Draft Environmental Assessment EA-1880: Notice of Availability of a Draft Environmental Assessment Big Bend to Witten Transmission Line Project, South Dakota The USDA Rural Utilities Service, initially the lead agency, issued a draft EA that assesses the potential environmental impacts of a proposal by Basic Electric Power Cooperative to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line in South Dakota.

  3. EA-1946: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1946: Draft Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. EA-1946-DEA-2014.pdf (9.88 MB) More Documents & Publications EA-1946: Final

  4. EA-1946: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1946: Final Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration (BPA) issued a Final EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. The Final EA consists of comments received on the draft EA and responses to the

  5. EA-1959: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Draft Environmental Assessment EA-1959: Draft Environmental Assessment Eightmile Ranch Coho Acclimation Site; Okanogan County, Washington Bonneville Power Administration and USDA Forest Service, Okanogan-Wenatchee National Forest, jointly issued a draft EA that assesses the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation to construct and operate a coho salmon acclimation pond at Eightmile Ranch, which is owned and operated by the Forest

  6. EA-1875: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    875: Final Environmental Assessment EA-1875: Final Environmental Assessment Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal grant funding to design, permit, and construct a Biomass Energy Center at The Jackson Laboratory (the Laboratory) in Bar Harbor, Maine. Final Environmental Assessment for the Jackson Laboratory Biomass Energy Center Project, Bar Harbor, Maine, DOE/EA-1875 (June 2011)

  7. EA-1900: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 0: Notice of Availability of a Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York DOE announces the availability of the Draft Environmental Assessment for the Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York. EA-1900-NOA-DEA-2012 (11.34 KB)

  8. EA-2021: Notice of Availability of the Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Availability of the Draft Environmental Assessment EA-2021: Notice of Availability of the Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11) Section 413 of the Energy Independence and Security Act of 2007 (EISA) directs DOE to establish energy conservation standards for manufactured housing. This Draft Environmental Assessment and Request for Information on Impacts to Indoor Air Quality evaluates the potential

  9. EA-1339: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    12: Final Environmental Assessment EA-1312: Final Environmental Assessment Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) This document is the Environmental Assessment (EA) for the proposed action to address ground water contamination at the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This site is also known as the former Climax uranium millsite. The purpose of this EA is to present the proposed action and

  10. EA-1386: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Assessment EA-1381: Final Environmental Assessment Atlas Relocation and Operation at the Nevada Test Site The National Nuclear Secuxity Administration (NNSA) prepared an Environmental Assessment (EA) (DOEIEA-1381) to analyze the proposed action to relocate the Atlas pulse power machine from Los Alamos National Laboratory (LANL) to the Nevada Test Site (NTS). At the NTS, Atlas would be reassembled in a newly constructed building within a designated Industrial, Research, and

  11. EA-1483: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Assessment EA-1483: Final Environmental Assessment Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory; East Argonne, Illinois The U.S. Department of Energy (DOE) is proposing to decontaminate and decommission the Juggernaut Reactor located at Argonne National Laboratory-East (ANL-E) in Argonne, Illinois. Final Environmental Assessment for Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory;

  12. Golden Reading Room: Environmental Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessments Golden Reading Room: Environmental Assessments Below are electronic versions of Golden Field Office Reading Room documents that were created after November 1, 1996, per the requirements of the Electronic Freedom of Information Act Amendment of 1996. Most documents are available in Adobe Acrobat Portable Document Format (PDF). DOCUMENTS AVAILABLE FOR DOWNLOAD June 29, 2016 EA-2021: Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN

  13. EA-1193: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1193: Final Environmental Assessment Atmospheric Radiation Measurement (ARM) Program North Slope of Alaska and Adjacent Arctic Ocean Cloud and Radiation Testbed (CART) Site The ...

  14. EA-1880: Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Prepare an Environmental Assessment and Notice of Public Meetings Big Bend to Witten Transmission Line Project, South Dakota The Rural Utilities Service (RUS) intends to...

  15. EA-1922: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1922: Draft Environmental Assessment Combined Power and Biomass Heating System, Fort ... equipment and develop a CHP Plant and district energy system, harvest biomass for use ...

  16. Preliminary Environmental Assessment and Analysis of EGS Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment and Analysis of EGS Technologies EGS presentation by Caroline Mann on May 7, 2012 PDF icon gtpegstechanalysis05-2012.pdf More Documents & Publications...

  17. EA-1945: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1945: Draft Environmental Assessment Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft...

  18. EA-1927: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1927: Draft Environmental Assessment Paducah Gaseous Diffusion Plant Potential Land and ... impacts of the proposed transfer of land and facilities at the Paducah Gaseous ...

  19. EA-1983: Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1983: Notice of Intent to Prepare an Environmental Assessment Sabine Pass Liquefaction Expansion Project, Cameron Parish, Louisiana The Federal Energy Regulatory...

  20. EA-1849: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    EA-1849: Final Environmental Assessment Tuscarora Geothermal Power Plant, Elko County, ... The power production facilities include the Tuscarora Geothermal Power Plant Facility ...

  1. EA-1789: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1789: Final Environmental Assessment Construction and Operation of a Proposed ... (API) to support the final design, construction, and start-up of a cellulose to ...

  2. EA-1650: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The staff of the Federal Energy Regulatory Commission (FERC or Commission) and the Department of Energy (DOE), Office of Fossil Fuels, have prepared an environmental assessment ...

  3. Environmental Assessment for Department of Energy Loan Guarantee...

    Open Energy Info (EERE)

    for DOI availability: http:crossref.org Online Internet link for Environmental Assessment for Department of Energy Loan Guarantee for U.S. Geothermal's Neal Hot Springs...

  4. Environmental Assessment for Department of Energy Loan Guarantee...

    Open Energy Info (EERE)

    Environmental Assessment for Department of Energy Loan Guarantee for U.S. Geothermal's Neal Hot Springs Geothermal Facility in Vale, Oregon Jump to: navigation, search OpenEI...

  5. EA-1812: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips ... Renewable Energy Deployment Program to Phillips County for design, permitting, and ...

  6. EA-1812: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1812: Final Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips ... Renewable Energy Deployment Program to Phillips County for design, permitting, and ...

  7. EA-1499: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1499: Final Environmental Assessment RadiologicalNuclear Countermeasures Test and Evaluation Complex, Nevada Test Site The DOE, National Nuclear Security Administration Nevada ...

  8. EA-1406: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1406: Final Environmental Assessment Ground Water Compliance at the New Rifle, ... controls and continued monitoring for the New Rifle uranium mill tailings site. ...

  9. EA-1859: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1859: Final Environmental Assessment Kirkwood Community College Wind Turbine Project ... who would use these funds to purchase equipment for one 2.5-megawatt wind turbine. ...

  10. EA-2003: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-2003: Final Environmental Assessment Sandy River Delta Section 536 Ecosystem Restoration Project, Multnomah County, Oregon The U.S. Army Corps of Engineers prepared an EA that ...

  11. EA-1994: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1994: Draft Environmental Assessment Malheur Resource Area Jonesboro Diversion Dam ... for replacement of an existing diversion dam and installation of a fish passage ...

  12. EA-1709: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Compact Power, Inc. Electric Drive Vehicle Battery and Component Manufacturing Initiative ... Environmental Assessment for Compact Power, Inc. Electric Drive Vehicle Battery and ...

  13. EA-1336: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1336: Final Environmental Assessment Ocean Sequestration of Carbon Dioxide Field ... evaluate the dispersion and diffusion of liquid carbon dioxide droplets in ocean waters. ...

  14. EA-1880: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1880: Notice of Intent to Prepare an Environmental Assessment and Notice of Public Meetings EA-1880: Notice of Public Comment Period Extension Project Reports for Lower Brule ...

  15. EA-1440: Final Site-Wide Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    alternative energy research. These improvements are needed to allow for growth of NREL's research programs. DOEEA-1440 Final Site-Wide Environmental Assessment of the ...

  16. EA-1740: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project of installing and operating a CHP system, and the No-Action Alternative. Final Environmental Assessment For The Thermal Energy Corporation Combined Heat And Power Project, ...

  17. EA-1804: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the alternative of not implementing this project (the No-Action Alternative). Final Environmental Assessment for Sauk Valley Community College's Wind Energy Project, Dixon, Lee ...

  18. EA-1663: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory (BNL) and compares the potential impacts to the No Action Alternative. Environmental Assessment For Bp Solar Array Project Brookhaven National Laboratory Upton, New ...

  19. Environmental Assessment of Plug-In Hybrid Electric Vehicles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1: Nationwide Greenhouse Gas Emissions (3.06 MB) More Documents & Publications Alternative Transportation ...

  20. EA-1802: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and the alternative of not implementing this project (No-Action Alternative). Final Environmental Assessment for Chicago View Wind Project, Chicago Heights, Cook County, ...

  1. EA-1607: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sale2 to appropriately licensed entities (the Direct Sale Alternative). DOEEA-1607: Final Environmental Assessment for Disposition of DOE Excess Depleted Uranium, Natural ...

  2. EA-2020: Notice of Availability of Draft Environmental Assessment...

    Office of Environmental Management (EM)

    EA-2020: Notice of Availability of Draft Environmental Assessment Energy Efficiency Standards for New Federal Low-Rise Residential Buildings' Baseline Standards Update (RIN ...

  3. Draft Environmental Assessment for Direct Final Rule, 10 CFR...

    Broader source: Energy.gov (indexed) [DOE]

    ENVIRONMENTAL ASSESSMENT FOR Final Rule, 10 CFR Part 433, "Energy Efficiency Standards for New Federal Commercial and Multi- Family High-Rise Residential Buildings' Baseline ...

  4. Public Involvement in the Environmental Assessment Process (DOE, 2010)

    Broader source: Energy.gov [DOE]

    A DOE policy regarding the online publication and electronic notification of the availability of draft environmental assessments (EAs) for public comment.

  5. EA-1976D: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida DOE's National Energy Technology Laboratory (NETL) announces the...

  6. EA-1747: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky ... The purpose of the Proposed Action is to reduce or eliminate the retention of surface ...

  7. EA-1903: Notice of Scoping of an Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Scoping of an Environmental Assessment Kansas State University (KSU) Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office is requesting public ...

  8. EA-1269: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1269: Final Environmental Assessment Decontamination and Volume Reduction System for ... The proposed process, called the decontamination and volume reduction system (DVRS), would ...

  9. EA-1900: Notice of Availability of a Final Environmental Assessment...

    Office of Environmental Management (EM)

    EA-1900: Notice of Availability of a Final Environmental Assessment and Finding of No Significant Impact Radiological Work and Storage Building at the Knolls Atomic Power ...

  10. EA-1903: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the ...

  11. EA-1488: Environmental Assessment for the U-233 Disposition,...

    Office of Environmental Management (EM)

    88: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory, Oak Ridge, Tennessee ...

  12. EA-1574: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1488: Finding of No Significant Impact EA-1488: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak ...

  13. EA-1579: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Groundwater Corrective Measures, DOEEA-1579 (February 2007) More Documents & Publications EA-1696: Final Environmental Assessment EIS-0225-SA-03: Supplement Analysis EA-1464

  14. EA-1809: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces the...

  15. ORISE: Capabilities in environmental assessments and health physics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Institute for Science and Education (ORISE) provides environmental assessments and health physics services for the U.S. Department of Energy, the U.S. Nuclear Regulatory...

  16. EA-1611-S1: Draft Supplemental Environmental Assessment | Department...

    Broader source: Energy.gov (indexed) [DOE]

    supplemental EA that assesses the potential environmental impacts of the proposed expansion of Colorado Highlands Wind Project, which interconnects to Western's transmission...

  17. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Assessment (EA) for Potential Land and Facilities Transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. DOE is inviting comments on...

  18. EA-1356: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-1356: Final Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation The U.S. Department of Energy (DOE)...

  19. EA-1956: Draft Site-Wide Environmental Assessment

    Broader source: Energy.gov [DOE]

    Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

  20. EA-1966: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    facility south of Hebron in Morton and Stark Counties, North Dakota. PDF icon EA-1966-FEA-2014.pdf More Documents & Publications EA-1966: Draft Environmental Assessment EA-1902:...

  1. EA-1573: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Director's Discretionary Research and Development Program, Annual Report FY 2007 EA-1968: Final Site-Wide Environmental Assessment EA-1573-S1: Proposed Renewable Fuel Heat Plant ...

  2. EIS-0487: Notice of Intent to Prepare an Environmental Assessment...

    Office of Environmental Management (EM)

    EIS-0487: Notice of Intent to Prepare an Environmental Assessment Freeport LNG ... of facilities proposed by Freeport LNG Development, LP, Freeport LNG Expansion, ...

  3. EA-1927: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    EA-1927: Final Environmental Assessment Paducah Gaseous Diffusion Plant Potential Land and ... the Paducah Gaseous Diffusion Plant from DOE to other entities for economic development. ...

  4. Environmental Hazards Assessment Program. Volume 4: Annual report, July 1, 1993--June 30, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Medical University of South Carolina`s (MUSC) vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. The significant growth in the number of environmental/health information systems that has occurred over the past few years has made data access challenging. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirements of EHAP. The following topics are addressed in this report: immunological consequences of beryllium exposure; assessment of genetic risks to environmental diseases; low dose-rate radiation health effects; environmental risk perception in defined populations; information support and access systems; and environmental medicine and risk communication: curriculum and a professional support network-Department of Family Medicine.

  5. Environmental Assessment -- Test Area North pool stabilization project update

    SciTech Connect (OSTI)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  6. Electronic Products Environmental Assessment Tool (EPEAT)

    Broader source: Energy.gov [DOE]

    Attached for your information is a memorandum from the Executive Office of the President, Council on Environmental Quality, dated February 19, 2014 entitled "EPEAT Clarification for Federal...

  7. Environmental Assessments (EA) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Biofuels Production and Sequestration into the Mt. Simon Sandstone, Archer Daniels Midland Company Decatur, Illinois April 1, 2011 EA-1795: Final Environmental...

  8. EA-1792-S1: Final Supplemental Environmental Assessment | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy -S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior

  9. EA-1900: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1900: Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York This EA evaluates the potential environmental impacts of constructing and operating a new Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site. A modernized Radiological Work and Storage Building would streamline radioactive material handling and storage operations, permit

  10. EA-1900: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1900: Final Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York This EA evaluates the potential environmental impacts of constructing and operating a new Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site. A modernized radiological Work and Storage Building would streamline radioactive material handling and storage operations, permit

  11. EA-1949: FERC Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within

  12. EA-1949: FERC Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1949: FERC Final Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA On September 16, 2010, Snohomish PUD was selected for potential receipt of financial assistance from the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy to support the design, construction, deployment and monitoring phases of their project. To satisfy DOE's requirements under the National Environmental Policy Act (NEPA) for this

  13. EA-1949: FERC Notice of Availability of an Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy of an Environmental Assessment EA-1949: FERC Notice of Availability of an Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This Notice announces the availability of a Federal Energy Regulatory Commission (FERC) EA, which analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project

  14. EA-2013: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2013: Final Environmental Assessment Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) Western Area Power Administration (Western) and the Bureau of Land Management (BLM) jointly issued a final EA that analyzes the potential environmental impacts of Western's proposed use of selected herbicides for the treatment of undesirable vegetation within three existing substations on lands administered by BLM.

  15. EA-2019: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Draft Environmental Assessment EA-2019: Draft Environmental Assessment Lake Erie Connector Project DOE issued a Draft EA that evaluates the potential environmental impacts of issuing a Presidential permit for a new, 72-mile long, 1,000 megawatt, high-voltage direct current, electric transmission system that would cross the international border with Canada in Lake Erie and connect to the proposed Erie Converter Station in Conneaut Township, Pennsylvania. For more information on this project,

  16. EA-1792-S1: Draft Supplemental Environmental Assessment | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to

  17. EA-1950: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1950: Draft Environmental Assessment Bonneville Power Administration prepared a draft EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington. EA-1950-DEA-2013.pdf (7.21 MB) More Documents & Publications EA-1950: Finding of No Significant Impact and Mitigation Action Plan EA-1950: Final

  18. Environmental Assessment Q&A Fact Sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE has prepared a Draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. This document examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assess- ment also looks at the potential cumulative impacts of conducting experiments and operat- ing WIPP as a transuranic waste repository. This fact sheet

  19. EA-1903: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    03: Final Environmental Assessment EA-1903: Final Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas This EA evaluates the potential environmental impacts of a proposal to use Congressional Directed funds to develop the Great Plains Wind Energy Consortium aimed at increasing the penetration of wind energy via distributed wind power generation throughout the region. EA-1903-FEA-2014.pdf (14.29 MB) More Documents & Publications EA-1903: Draft

  20. EA-2001: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2001: Final Environmental Assessment Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD39) Section 305(a) of the Energy Conservation and Production Act (ECPA) requires that DOE establish by rule Federal building and energy efficiency standards for all Federal commercial and multi-family high-rise residential buildings. This final EA evaluates the potential environmental

  1. EA-2004: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-2004: Draft Environmental Assessment The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct up to a 2.0-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental

  2. EA-2004: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2004: Final Environmental Assessment The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct up to a 2.0-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental

  3. EA-2018: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18: Draft Environmental Assessment EA-2018: Draft Environmental Assessment Front Range-Midway Solar Interconnection Project; El Paso County, Colorado Western Area Power Administration issued a draft EA that analyzes the potential environmental impacts of interconnecting a proposed photovoltaic solar facility adjacent to Western's existing Midway Substation in El Paso County, Colorado. For more information on this project, see: www.energy.gov/node/1907551. Download Document EA-2018: Draft

  4. EA-0978: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Assessment EA-0843: Final Environmental Assessment Idaho National Engineering Laboratory Low-Level and Mixed Waste Processing This EA evaluates the environmental impacts of a proposal to (1) reduce the volume of the U.S. Department of Energy's Idaho National Engineering Laboratory's (INEL) generated low-level waste (LLW) through sizing, compaction, and stabilization at Waste Experimental Reduction Facility (WERF); and (2) use commercial offsite facilities for supplemental

  5. EA-1172: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    72: Final Environmental Assessment EA-1172: Final Environmental Assessment Sale of Surplus Natural and Low Enriched Uranium This EA evaluates the environmental impacts for the proposal to sell uranium for subsequent enrichment and fabrication into commercial nuclear power reactor fuel. The uranium is currently stored at the U.S. Department of Energy Portsmouth gaseous diffusion plant in Portsmouth, Ohio, and the Paducah gaseous diffusion plant in Paducah, Kentucky. EA-1172-FEA-1996.pdf (509.29

  6. EA-1340: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    40: Final Environmental Assessment EA-1340: Final Environmental Assessment Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site This EA evaluates the environmental impacts for the proposal to make maximum use of existing U.S. Department of Energy Waste Isolation Pilot Plant (WIPP) facilities to further the scientific missions assigned to the Department of Congress to the extent it can do so without impacting the primary mission of WIPP, the disposal of defense transuranic

  7. Assessing potential future environmental legal events

    SciTech Connect (OSTI)

    Tonn, B.; Petrich, C.

    1997-10-28

    This report addresses the topic of environmental citizenship in the United States. The term refers to responsibilities each of us have with respect to helping our communities and nation make sound environmental decisions. This research centers on the citizens and what we ought to be doing, as opposed to what the government ought to be doing for us, to improve environmental citizenship. This report examines four central questions: What are the requirements (i.e., responsibilities) of citizenship vis-a-vis environmental decision- making processes; what constraints limit people`s ability to meet these requirements; what does our form of governance do to help or hinder in meeting these requirements; and what recommendations can be put forth to improve public participation in environmental decision making?

  8. Preliminary Environmental Assessment and Analysis of EGS Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    www.energy.gov Preliminary Environmental Assessment and Analysis of EGS Technologies May 7, 2012 - Westminster, CO Caroline Mann Environmental Stewardship Group EERE-HQ 2 www.energy.gov Agenda * Environmental Strategic Plan * Phased approach * Phase 1 results to date * Induced seismicity mitigation measures * Request for feedback * Contacts 3 www.energy.gov * National Environmental Policy Act (NEPA) compliance has the potential to be a critical path activity for EGS implementation * DOE

  9. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  10. Environmental Assessment for the Accelerated Tank Closure Demonstration Project

    SciTech Connect (OSTI)

    N /A

    2003-06-16

    of Federal Regulations (CFR), Parts 1500-1508. They require the preparation of an Environmental Assessment (EA) that includes an evaluation of alternative means of addressing the problem and a discussion of the potential environmental impacts of a proposed federal action. An EA provides analysis to determine whether an EIS or a finding of no significant impact should be prepared.

  11. Retrospective examination of geothermal environmental assessments

    SciTech Connect (OSTI)

    Webb, J.W.; Eddlemon, G.K.; Reed, A.W.

    1984-03-01

    Since 1976, the Department of Energy (DOE) has supported a variety of programs and projects dealing with the exploration, development, and utilization of geothermal energy. This report presents an overview of the environmental impacts associated with these efforts. Impacts that were predicted in the environmental analyses prepared for the programs and projects are reviewed and summarized, along with measures that were recommended to mitigate these impacts. Also, for those projects that have gone forward, actual impacts and implemented mitigation measures are reported, based on telephone interviews with DOE and project personnel. An accident involving spills of geothermal fluids was the major environmental concern associated with geothermal development. Other important considerations included noise from drilling and production, emissions of H/sub 2/S and cooling tower drift, disposal of solid waste (e.g., from H/sub 2/S control), and the cumulative effects of geothermal development on land use and ecosystems. Mitigation measures were frequently recommended and implemented in conjunction with noise reduction; drift elimination; reduction of fugitive dust, erosion, and sedimentation; blowout prevention; and retention of wastes and spills. Monitoring to resolve uncertainties was often implemented to detect induced seismicity and subsidence, noise, drift deposition, concentrations of air and water pollutants, and effects on groundwater. The document contains an appendix, based on these findings, which outlines major environmental concerns, mitigation measures, and monitoring requirements associated with geothermal energy. Sources of information on various potential impacts are also listed.

  12. Cumulative impacts in environmental assessments: How well are they considered

    SciTech Connect (OSTI)

    McCold, L. ); Holman, J. )

    1993-01-01

    The authors analyzed 89 environmental assessments published in the Federal Register from January 1 through June 30, 1992, to determine the extent to which their treatment of cumulative impacts met the requirements of 40 CFR 1500-1508. Only 35 (39%) EAs mentioned cumulative impacts. Nineteen EAs addressed cumulative impacts of some resources, but not others. The paper presents several recommendations: (1) past, present and reasonable foreseeable actions that could affect resources affected by the proposed action should be identified at the same time as, and be listed with, the proposed action. (2) for each resource, the discussion of cumulative impacts should follow immediately after the discussion of direct impacts to that resource. (3) conclusions about cumulative impacts should be supported by data and analyses. (4) agencies need a central review function to ensure the quality of their EAs.

  13. EA-2002: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-2002: Final Environmental Assessment Right-of-Way Application for the Tucson-Apache ... tribal land along the existing Tucson-Apache Transmission Line to replace the previous ...

  14. EA-1915: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Land at the Hanford Site, Richland, Washington The draft EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the ...

  15. EA-1915: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Land at the Hanford Site, Richland, Washington The final EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the ...

  16. Environmental Assessment for Final Rule 10 CFR 433

    Office of Energy Efficiency and Renewable Energy (EERE)

    Document details the U.S. Department of Energy's environmental assessment for the Final Rule 10 CFR Part 433, Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings.

  17. Draft Environmental Assessment on the Remote-handled Waste Disposition...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment The U.S. Department of Energy invites the public to review...

  18. Scoping the Environmental Assessment Process for a MRS

    Broader source: Energy.gov [DOE]

    Reaching negotiated agreement with a state or Indian tribe and preparing of the environmental assessment (EA) required by Section 404 of the Nuclear Waste Policy Act, as amended (NWPAA), are the...

  19. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Energy Savers [EERE]

    Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products Part I: Review of the Life-Cycle Energy Consumption of Incandescent, Compact Fluorescent, and LED ...

  20. EA-1301: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1301: Final Environmental Assessment Idaho Department of Fish and Game Captive Rearing ... have had far-reaching effects on many species of fish and wildlife within the basin. ...

  1. U.S. Department of Energy Adoption of Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Water System (DOEEA-1905) October 2011 United States Department of the Interior Bureau of Land Management Environmental Assessment DOI-BLM-NM- P020-114414 Double Eagle Water ...

  2. Final Environmental Assessment of Ground Water Compliance at...

    Office of Environmental Management (EM)

    458 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA ... DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick ...

  3. Finding of No Significant Impact Issued on Environmental Assessment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of No Significant Impact for the Final Environmental Assessment for the Remote-handled Waste Disposition Project (WDP-RWMC-09-008.)" Paper copies are available by contacting...

  4. EA-1925: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOEEA-1925) Ormat Nevada, ...

  5. EA-1931: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    PDF icon EA-1931-FEA-2014.pdf More Documents & Publications EA-1931: Draft Environmental Assessment EA-1931: Finding of No Significant Impact and Mitigation Action Plan EIS-0285-SA...

  6. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission ...

  7. Environmental Assessment for Actinide Chemistry and Repository Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory questions on the Environmental Assessment for Actinide Chemistry and Repository Science Laboratory, email Harold.Johnson@wipp.ws or call (505) 234-7349. Environmental Assessment for Actinide Chemistry and Repository Science Laboratory Final - January, 2006 This document has been provided to you in PDF format. Please install Adobe Acrobat Reader before accessing these documents. Some of the Chapters containing complex graphics have been split into multiple parts to allow for more

  8. Revised Environmental Assessment Large-Scale, Open-Air Explosive

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Assessment Large-Scale, Open-Air Explosive Detonation, DIVINE STRAKE, at the Nevada Test Site May 2006 Prepared by Department of Energy National Nuclear Security Administration Nevada Site Office Environmental Assessment May 2006 Large-Scale, Open-Air Explosive Detonation, DIVINE STRAKE, at the Nevada Test Site TABLE OF CONTENTS 1.0 PURPOSE AND NEED FOR ACTION.....................................................1-1 1.1 Introduction and

  9. Draft Environmental Assessment for NorthStar | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Draft Environmental Assessment for NorthStar ENVIRONMENTAL ASSESSMENT FOR NORTHSTAR MEDICAL TECHNOLOGIES LLC COMMERCIAL DOMESTIC PRODUCTION OF THE MEDICAL ISOTOPE MOLYBDENUM-99 Proposed Action: The Department of Energy (DOE) National Nuclear Security Administration (NNSA) proposes to provide funding to NorthStar to accelerate the establishment of the commercial production of the medical isotope molybdenum-99 using accelerator technology. Report Designation: Draft

  10. EA-1861: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal grant funding to design, permit, and construct a biomass boiler house at the Frito-Lay North America (Frito-Lay) plant in Beloit, Wisconsin. Frito-Lay would construct and operate a new boilerhouse for a wood chip boiler and purchase wood fuel from regional suppliers (proposed project).

  11. EA-2006: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2006: Final Environmental Assessment Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a final programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence

  12. Preliminary Environmental Assessment and Analysis of EGS Technologies |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Environmental Assessment and Analysis of EGS Technologies Preliminary Environmental Assessment and Analysis of EGS Technologies EGS presentation by Caroline Mann on May 7, 2012 gtp_egs_tech_analysis05-2012.pdf (327.3 KB) More Documents & Publications Water Use in the Development and Operations of Geothermal Power Plants Water Use in the Development and Operations of Geothermal Power Plants Seismicity Protocol

  13. EA-1488: Environmental Assessment for the U-233 Disposition, Medical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory, Oak Ridge, Tennessee | Department of Energy 8: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory, Oak Ridge, Tennessee EA-1488: Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

  14. EA-1655: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Assessment EA-1655: Final Environmental Assessment Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development The Proposed Action would create and operate an experimental facility for further advancing the development of laser-driven, plasma-based, particle beam accelerators. An existing, approximately 7,000-square-foot, accelerator laboratory area inside Building 71 at Lawrence Berkeley National Laboratory (LBNL) would be

  15. EA-1761: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Environmental Assessment EA-1761: Final Environmental Assessment Clemson University Wind Turbine Drivetrain Test Facility Clemson University is proposing to construct and operate a Wind Turbine Drivetrain Test Facility (DTTF) at the Clemson University Research Institute in North Charleston, South Carolina. This project would promote industry/government/university collaboration in research and workforce education and would be manned with a dedicated workforce to service industry needs

  16. EA-1970: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1970: Draft Environmental Assessment Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of Atlantic City, NJ. The proposed action includes a cable crossing from the turbines

  17. EA-1970: Notice of Availability of Draft Environmental Assessement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Availability of Draft Environmental Assessement EA-1970: Notice of Availability of Draft Environmental Assessement Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of

  18. EA-1985: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1985: Final Environmental Assessment Virginia Offshore Wind Technology Advancement Project on the Atlantic Outer Continental Shelf Offshore Virginia DOE is proposing to fund Virginia Electric and Power Company's Virginia Offshore Wind Technology Advancement Project (VOWTAP). The proposed VOWTAP project consists of design, construction and operation of a 12 megawatt offshore wind facility located approximately 24 nautical miles off the coast of Virginia Beach, VA

  19. EA-2001: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-2001: Draft Environmental Assessment Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD39) The U.S. Department of Energy (DOE) is publishing this final rule to implement provisions in the Energy Conservation and Production Act (ECPA) that require DOE to update the baseline Federal energy efficiency performance standards for the construction of new Federal commercial and

  20. EA-2017: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-2017: Final Environmental Assessment Braddock Locks and Dam Hydro Electric Project The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Hydro Green Energy, LLC to fabricate, install, and operate one interchangeable Modular Bulb Turbine (MBT) which would be inserted in a Large Frame Module (LFM) at the existing Braddock Locks and Dam. The installation would be part of a larger project that would include the design

  1. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    SciTech Connect (OSTI)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  2. A Holistic Framework for Environmental Flows Determination in Hydropower Contexts

    SciTech Connect (OSTI)

    McManamay, Ryan A; Bevelhimer, Mark S

    2013-05-01

    Among the ecological science community, the consensus view is that the natural flow regime sustains the ecological integrity of river systems. This prevailing viewpoint by many environmental stakeholders has progressively led to increased pressure on hydropower dam owners to change plant operations to affect downstream river flows with the intention of providing better conditions for aquatic biological communities. Identifying the neccessary magnitude, frequency, duration, timing, or rate of change of stream flows to meet ecological needs in a hydropower context is challenging because the ecological responses to changes in flows may not be fully known, there are usually a multitude of competing users of flow, and implementing environmental flows usually comes at a price to energy production. Realistically, hydropower managers must develop a reduced set of goals that provide the most benefit to the identified ecological needs. As a part of the Department of Energy (DOE) Water Power Program, the Instream Flow Project (IFP) was carried out by Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Argon National Laboratory (ANL) as an attempt to develop tools aimed at defining environmental flow needs for hydropower operations. The application of these tools ranges from national to site-specific scales; thus, the utility of each tool will depend on various phases of the environmental flow process. Given the complexity and sheer volume of applications used to determine environmentally acceptable flows for hydropower, a framework is needed to organize efforts into a staged process dependent upon spatial, temporal, and functional attributes. By far, the predominant domain for determining environmental flows related to hydropower is within the Federal Energy Regulatory Commission (FERC) relicensing process. This process can take multiple years and can be very expensive depending on the scale of each hydropower project. The utility of such a

  3. Role of basic ecological knowledge in environmental assessment

    SciTech Connect (OSTI)

    Hildebrand, S.G.; Barnthouse, L.W.; Suter, G.W.

    1984-01-01

    The role of basic ecological knowledge in environmental impact assessment was examined. The focus was primarily on the NEPA process. Experience in population biology and ecosystem studies is discussed, the successes and limits of applicability are highlighted, and implications for long-term research needs are identified. Current attempts to develop a national assessment of acid deposition impacts are reviewed. 48 refs. (ACR)

  4. EA-1774-S1: Final Environmental Assessment and Finding of No...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-S1: Final Environmental Assessment and Finding of No Significant Impact EA-1774-S1: Final Environmental Assessment and Finding of No Significant Impact Energy Conservation ...

  5. Fish behavior, migration and environmental assessment

    SciTech Connect (OSTI)

    Gray, R.H.

    1988-02-01

    Studies at the Pacific Northwst Laboratory have evaluated fish behavior and migration in response to thermal discharge, gas supersaturated water, water-soluble fractions of coal liquids, and other environmental stresses. Major findings including thermal discharges did not block upstream migration of sonic-tagged adult chinook salmon (Oncorhynchus tschawytscha) and a rainbow trout (Salmo gairdneri) in the Columbia River. Juvenile chinook slamon avoided thermal discharges in the laboratory when ..delta..ts exceeded 9 to 11)degree)C above ambient. However juvenile salmon were more susceptible to predation at 10 to 20% of the thermal dose causing loss of equilibrium. Radio-tagged adult chinook salmon swam deeper in supersaturated water than in normally saturated water in the Snake River and, thereby, avoided the upper, critical zone. Carp (Cyprinus carpio) and black bullhead (Ictalurus melas) did not always avoid lethal gas levels in the laboratory and some fish died in the test apparatus. Fathead minnow (Pimephales promelas) avoided the water soluble fraction (WSF) of a coal liquid at concentrations causing acute effects but not at those causing chronic effects. Rainbow trout did not avoid coal liquid WSFs although they reportedly avid the major constituent, phenol, tested a as pure compound. Susceptibility to predation of juvenile rainbow trout did not increase until phenol concentrations reached the acute LC/sub 50/. 67 refs., 11 figs., 1 tab.

  6. Environmental monitoring, restoration and assessment: What have we learned

    SciTech Connect (OSTI)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  7. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  8. Blue Creek Winter Range : Wildlife Mitigation Project : Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    This preliminary Environmental Assessment examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities are analyzed: Habitat protection; Habitat enhancement; Operation and maintenance; and Monitoring and evaluation. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  9. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.

  10. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

  11. Environmental, health, and safety assessment of photovoltaics

    SciTech Connect (OSTI)

    Rose, E.C.

    1983-10-15

    Potential enviornmental, health, and safety (E,H and S) concerns associated with all phases of the photovoltaic (PV) energy system life cycle are identified and assessed. E,H and S concerns affecting the achievement of National PV Program goals or the viability of specific PV technologies are emphasized. The report is limited to near-term manufacturing process alternatives for crystalline silicon PV materials, addresses flat-plate and concentrator collector designs, and reviews system deployment in grid-connected, roof-mounted, residential and ground-mounted central-station applications. The PV life-cycle phases examined include silicon refinement and manufacture of PV collectors, system deployment, and decommissioning. The primary E,H and S concerns that arise during collector fabrication are associated with occupational exposure to materials of undetermined toxicity or to materials that are known to be hazardous, but for which process control technology may be inadequate. Stricter exposure standards are anticipated for some materials and may indicate a need for further control technology development. Minimizing electric shock hazards is a significant concern during system construction, operation and maintenance, and decommissioning.

  12. Environmental Impact Assessment (EIA) Process of V1 NPP Decommissioning

    SciTech Connect (OSTI)

    Matejovic, Igor; Polak, Vincent

    2007-07-01

    Through the adoption of Governmental Resolution No. 801/99 the Slovak Republic undertook a commitment to shutdown units 1 and 2 of Jaslovske Bohunice V 1 NPP (WWER 230 reactor type) in 2006 and 2008 respectively. Therefore the more intensive preparation of a decommissioning documentation has been commenced. Namely, the VI NPP Conceptual Decommissioning Plan and subsequently the Environmental Impact Assessment Report of VI NPP Decommissioning were developed. Thus, the standard environmental impact assessment process was performed and the most suitable alternative of V1 NPP decommissioning was selected as a basis for development of further decommissioning documents. The status and main results of the environmental impact assessment process and EIA report are discussed in more detail in this paper. (authors)

  13. A qualitative method proposal to improve environmental impact assessment

    SciTech Connect (OSTI)

    Toro, Javier; Requena, Ignacio; Duarte, Oscar; Zamorano, Montserrat

    2013-11-15

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.

  14. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  15. EA-1726: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1726: Final Environmental Assessment Loan Guarantee to Kahuku Wind Power, LLC for Construction of the Kahuku Wind Power Facility in Kahuku, O'ahu, Hawai'i DOE's proposed action is to issue a $117 million loan guarantee to Kahuku Wind Power LLC to support construction of the Kahuku Wind Power facility. The proposed facility would consist of 12 Clipper LibertyTM 2.5-MW WTGs, an operations and maintenance (O&M) building, one permanent unguyed meteorological

  16. RAPID DETERMINATION OF RA-226 IN ENVIRONMENTAL SAMPLES

    SciTech Connect (OSTI)

    Maxwell, S.

    2012-01-03

    A new rapid method for the determination of {sup 226}Ra in environmental samples has been developed at the Savannah River Site Environmental Lab (Aiken, SC, USA) that can be used for emergency response or routine sample analyses. The need for rapid analyses in the event of a Radiological Dispersive Device or Improvised Nuclear Device event is well-known. In addition, the recent accident at Fukushima Nuclear Power Plant in March, 2011 reinforces the need to have rapid analyses for radionuclides in environmental samples in the event of a nuclear accident. {sup 226}Ra (T1/2 = 1,620 years) is one of the most toxic of the long-lived alpha-emitters present in the environment due to its long life and its tendency to concentrate in bones, which increases the internal radiation dose of individuals. The new method to determine {sup 226}Ra in environmental samples utilizes a rapid sodium hydroxide fusion method for solid samples, calcium carbonate precipitation to preconcentrate Ra, and rapid column separation steps to remove interferences. The column separation process uses cation exchange resin to remove large amounts of calcium, Sr Resin to remove barium and Ln Resin as a final purification step to remove {sup 225}Ac and potential interferences. The purified {sup 226}Ra sample test sources are prepared using barium sulfate microprecipitation in the presence of isopropanol for counting by alpha spectrometry. The method showed good chemical recoveries and effective removal of interferences. The determination of {sup 226}Ra in environmental samples can be performed in less than 16 h for vegetation, concrete, brick, soil, and air filter samples with excellent quality for emergency or routine analyses. The sample preparation work takes less than 6 h. {sup 225}Ra (T1/2 = 14.9 day) tracer is used and the {sup 225}Ra progeny {sup 217}At is used to determine chemical yield via alpha spectrometry. The rapid fusion technique is a rugged sample digestion method that ensures that any

  17. EA-1207: Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

    Broader source: Energy.gov [DOE]

    Pit Disassembly and Conversion Demonstration Environmental Assessment and Research and Development Activities

  18. Radiological assessment. A textbook on environmental dose analysis

    SciTech Connect (OSTI)

    Till, J.E.; Meyer, H.R.

    1983-09-01

    Radiological assessment is the quantitative process of estimating the consequences to humans resulting from the release of radionuclides to the biosphere. It is a multidisciplinary subject requiring the expertise of a number of individuals in order to predict source terms, describe environmental transport, calculate internal and external dose, and extrapolate dose to health effects. Up to this time there has been available no comprehensive book describing, on a uniform and comprehensive level, the techniques and models used in radiological assessment. Radiological Assessment is based on material presented at the 1980 Health Physics Society Summer School held in Seattle, Washington. The material has been expanded and edited to make it comprehensive in scope and useful as a text. Topics covered include (1) source terms for nuclear facilities and Medical and Industrial sites; (2) transport of radionuclides in the atmosphere; (3) transport of radionuclides in surface waters; (4) transport of radionuclides in groundwater; (5) terrestrial and aquatic food chain pathways; (6) reference man; a system for internal dose calculations; (7) internal dosimetry; (8) external dosimetry; (9) models for special-case radionuclides; (10) calculation of health effects in irradiated populations; (11) evaluation of uncertainties in environmental radiological assessment models; (12) regulatory standards for environmental releases of radionuclides; (13) development of computer codes for radiological assessment; and (14) assessment of accidental releases of radionuclides.

  19. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    SciTech Connect (OSTI)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  20. Environmental assessment: Reference repository location, Hanford site, Washington

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a reference repository location at the Hanford Site in Washington as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The site is in the Columbia Plateau, which is one of five distinct geohydrologic settings considered for the first repository. To determine their suitability, the Hanford site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. On the basis of the evaluations reported in this EA, the DOE has found that the Hanford site is not disqualified under the guidelines. The DOE has also found that is is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Hanford site as one of five sites available for characterization.

  1. Environmental assessment: Reference repository location, Hanford site, Washington

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a reference repository location at the Hanford Site in Washington as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. The site is in the Columbia Plateau, which is one of five distinct geohydrologic settings considered for the first repository. To determine their suitability, the Hanford Site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EAs. On the basis of the evaluations reported in this EA, the DOE has found that the Hanford site is not disqualified under the guidelines. The DOE has also found that it is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Hanford site as one of five sites suitable for characterization.

  2. ORISE: Environmental Assessments and Health Physics fact sheet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Assessments and Health Physics ORAU helps protect workers, the public and the environment from potential radiological and chemical contamination by providing reviews and field surveys to assure contaminated sites are appropriately cleaned up. Working independently from the cleanup contractors, ORAU ensures that necessary quality assurance procedures are in place and verifies whether the cleanup meets federal requirements. What We Do * Independent Verification * Characterization

  3. OCEAN THERMAL ENERGY CONVERSION: AN OVERALL ENVIRONMENTAL ASSESSMENT

    SciTech Connect (OSTI)

    Sands, M.Dale

    1980-08-01

    Significant acccrmplishments in Ocean Thermal Energy Conversion (OTEC) technology have increased the probability of producing OTEC-derived power within this decade with subsequent large scale commercialization following by the turn of the century. Under U.S. Department of Energy funding, the Oceanic Engineering Operations of Interstate Electronics Corporation has prepared several OTEC Environmental Assessments over the past years, in particular, the OTEC Programmatic Environmental Assessment. The Programmatic EA considers several technological designs (open- and closed-cycle), plant configuratlons (land-based, moored, and plant-ship), and power usages (baseload electricity, ammonia and aluminum production). Potential environmental impacts, health and safetv issues and a status update of the institutional issues as they influence OTEC deployments, are included.

  4. Environmental assessment of USAID housing projects in the Russian Federation

    SciTech Connect (OSTI)

    Loran, B.; Miller, C.

    1995-12-01

    Parsons was selected by the United States Agency for International Development (USAID) as the general contractor for construction management for the construction of 2,500 housing units within the Russian Federation. These housing units, to be occupied by Russian officers returning from the Baltic States, are under construction on 15 sites, selected from an initial list of 200, based on habitability, capability of successful final construction. Cost meeting USAID guidelines, and impacts on the environment. USAID fulfilled NEPA requirements by preparing, with assistance of Parsons Engineering Science, a Programmatic Environmental Assessment and 15 site specific Environmental Assessments for the project. The sites were scattered over the entire Russian Federation west of the Ural Mountains. The site offerors completed an environmental checklist covering a broad range of possible impacts. Significant environmental issues and concerns were further identified during scoping meetings held at the site locations. The most important issues discussed were: soil contamination; gaseous, liquid, and solid pollutants to which the site may be exposed; incompatible adjacent land uses; ready access to utilities and social services; and socioeconomic situation favorable to resettlement of Russian military officers. No major environmental issues or concerns were identified for the 15 selected sites. Certificates indicating the absence of chemical and radiological surface and subsurface contamination at the proposed sites were provided by the local environmental officers. Polynuclear aromatic hydrocarbons were found present at one of the sites considered in a preliminary selection, and later rejected due to the failure of contractual negotiations. The environmental assessments included mitigation and monitoring measures for construction and operation (occupancy) impacts.

  5. Environmental implications of accelerated gasohol production: preliminary assessment

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    This report assesses the environmental impacts of increasing US production of fuel ethanol by 330 million gallons per year in the 1980 to 1981 time frame in order to substitute gasohol for 10% of the unleaded gasoline consumed in the United States. Alternate biomass feedstocks are examined and corn is selected as the most logical feedstock, based on its availability and cost. Three corn conversion processes that could be used to attain the desired 1980 to 1981 production are identified; fermentation plants that use a feedstock of starch and wastes from an adjacent corn refining plants are found to have environmental and economic advantages. No insurmountable environmental problems can be achieved using current technology; the capital and operating costs of this control are estimated. If ethanol production is increased substantially after 1981, the environmentally acceptable use or disposal of stillage, a liquid by-product of fermentation, could become a serious problem.

  6. Environmentally based siting assessment for synthetic-liquid-fuels facilities. Final report

    SciTech Connect (OSTI)

    1980-01-01

    A detailed assessment of the major environmental constraints to siting a synthetic fuels industry and the results of that assessment are used to determine on a regional basis the potential for development of such an industry with minimal environmental conflicts. Secondly, the ability to mitigate some of the constraining impacts through alternative institutional arrangements, especially in areas that are judged to have a low development potential is also assessed. Limitations of the study are delineated, but specifically, the study is limited geographically to well-defined boundaries that include the prime coal and oil shale resource areas. The critical factors used in developing the framework are air quality, water availability, socioeconomic capacity, ecological sensitivity, environmental health, and the management of Federally owned lands. (MCW)

  7. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    SciTech Connect (OSTI)

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  8. Environmental assessment of the import of Russian plutonium-238

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The United States (U.S.) is proposing to purchase plutonium-238 (Pu-238) from the Russian Federation (Russia) for use in the Nations`s space program. The National Environmental Policy Act of 1969 (NEPA), as amended, requires the assessment of environmental consequences of all major Federal actions that may significantly affect the quality of the human environment. Accordingly, the US Department of Energy (DOE) prepared this Environmental Assessment (EA) to identify and evaluate the environmental consequences of importing Pu-238 fuel from Russia, and of the initial transport and processing of such fuel within the US., as necessary, to add the fuel to the existing US inventory. Since the proposed action involves ocean transport, DOE also considered the environmental consequences of this action on the global commons in accordance with Executive Order 12114 and DOE Guidelines for Compliance with Executive Order 12114. During the transportation sequence from point of origin in Russia to the US, and within the US from the port of entry to either SRS or LANL, various environments could be affected by the proposed action. These potentially affected environments include the Russian land and port environments, the marine environment, the US port locale, highway routes, LANL, and SRS. Each of these is discussed below the connection with the proposed action.

  9. Contents of environmental assessments prepared for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This document presents two versions of the outline for the environmental assessments (EAS) to be prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The first displays the basic structure of the assessments; it lists only the titles of sections. The second is a guide to the contents of the assessments which provides, under each title, a brief summary of contents. The outline is intended to comply with the planning requirements (40 CFR Part 1501) and the definitions of terms (40-' CFR Part 1508) established by the Council on Environmental Quality as well as DOE order 5440.lB (Implementation of the National Environmental Policy Act), and compliance with Floodplain/Wetlands Environmental Review Requirements (10 CFR Part 1022). These requirements and definitions are implicitly part of the outline. The outline presented in this document will guide the preparation of EAs. The UMTRA Project EAs will be used in determining whether the DOE should prepare an environmental impact statement or a finding of no significant impact for the actions at each of the sites. If no impact statement is necessary, the environmental assessment for that site will aid the DOE in complying with the National Environmental Policy Act before beginning remedial actions. If an impact statement is needed, the assessment will aid its preparation. These purposes, established by the Council on Environmental Quality in 40 CFR Part 1508.9(a), have guided the construction of the outline presented in this document. Remedial actions at each site will include the cleanup of properties in the vicinity of the tailings sites that have been contaminated by the tailings.

  10. Contents of environmental assessments prepared for the Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This document presents two versions of the outline for the environmental assessments (EAS) to be prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The first displays the basic structure of the assessments; it lists only the titles of sections. The second is a guide to the contents of the assessments which provides, under each title, a brief summary of contents. The outline is intended to comply with the planning requirements (40 CFR Part 1501) and the definitions of terms (40-` CFR Part 1508) established by the Council on Environmental Quality as well as DOE order 5440.lB (Implementation of the National Environmental Policy Act), and compliance with Floodplain/Wetlands Environmental Review Requirements (10 CFR Part 1022). These requirements and definitions are implicitly part of the outline. The outline presented in this document will guide the preparation of EAs. The UMTRA Project EAs will be used in determining whether the DOE should prepare an environmental impact statement or a finding of no significant impact for the actions at each of the sites. If no impact statement is necessary, the environmental assessment for that site will aid the DOE in complying with the National Environmental Policy Act before beginning remedial actions. If an impact statement is needed, the assessment will aid its preparation. These purposes, established by the Council on Environmental Quality in 40 CFR Part 1508.9(a), have guided the construction of the outline presented in this document. Remedial actions at each site will include the cleanup of properties in the vicinity of the tailings sites that have been contaminated by the tailings.

  11. Assessment of Environmental Impacts of Shell GTL Fuel | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Environmental Impacts of Shell GTL Fuel Assessment of Environmental Impacts of Shell GTL Fuel Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. 2006_deer_cherrillo.pdf (315.83 KB) More Documents & Publications An Evaluation of Shell GTL Diesel Shell Gas to Liquids in the context of a Future Fuel Strategy - Technical Marketing Aspects Verification of Shell GTL

  12. Medical University of South Carolina Environmental Hazards Assessment Program. Volume 5: Annual report, July 1, 1993--June 30, 1994 deliverables

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Medical University of South Carolina`s vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirement of EHAP. The following topics are addressed in this report: environmental medicine and risk communication: curriculum and a professional support network-Department of Family Medicine; environmental hazards assessment and education program in pharmacy graduate education in risk assessment; and graduate education risk assessment.

  13. Environmental assessment of spatial plan policies through land use scenarios

    SciTech Connect (OSTI)

    Geneletti, Davide

    2012-01-15

    This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of how the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.

  14. A Protocol for Lifetime Energy and Environmental Impact Assessment of Building Insulation Materials

    SciTech Connect (OSTI)

    Shrestha, Som S; Biswas, Kaushik; Desjarlais, Andre Omer

    2014-01-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors, and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist that provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines.

  15. Environmental assessment: Reference repository location, Hanford Site, Washington (US)

    SciTech Connect (OSTI)

    none,

    1986-05-01

    This appendix responds to the issues raised by Federal, State, and local governments, affected Indian Tribes, private citizens, and other organizations on the draft environmental assessment (EA) that was prepared pursuant to Section 112 of the Nuclear Waste Policy Act of 1982. In addition to presenting the issues raised in the comments and the responses, it describes where changes were made in the final EA. 535 refs., 13 figs., 16 tabs.

  16. FOR THE SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT/FINDING OF NO

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 FOR THE SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT/FINDING OF NO SIGNIFICANT IMPACT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT CASTINE, MAINE DOE/EA-1792-S1 US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado November 2014 Supplement Analysis - 2 i November 20, 2014 DOE/EA-1792-S1 CONTENTS 1.0 Background

  17. EA-1634: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    13: Finding of No Significant Impact EA-1613: Finding of No Significant Impact Proposed High Explosive Pressing Facility Pantex Plant, Amarillo, Texas The proposed action is to construct a new facility that would consolidate the Pantex Plant's current high explosive pressing activities at one facility. Finding of No Significant Impact High Explosive Pressing Facility (1.76 MB) More Documents & Publications EA-1613: Final Environmental Assessment EA-1533: Finding of No Significant Impact

  18. A protocol for lifetime energy and environmental impact assessment of building insulation materials

    SciTech Connect (OSTI)

    Shrestha, Som S. Biswas, Kaushik; Desjarlais, Andre O.

    2014-04-01

    This article describes a proposed protocol that is intended to provide a comprehensive list of factors to be considered in evaluating the direct and indirect environmental impacts of building insulation materials, as well as detailed descriptions of standardized calculation methodologies to determine those impacts. The energy and environmental impacts of insulation materials can generally be divided into two categories: (1) direct impact due to the embodied energy of the insulation materials and other factors and (2) indirect or environmental impacts avoided as a result of reduced building energy use due to addition of insulation. Standards and product category rules exist, which provide guidelines about the life cycle assessment (LCA) of materials, including building insulation products. However, critical reviews have suggested that these standards fail to provide complete guidance to LCA studies and suffer from ambiguities regarding the determination of the environmental impacts of building insulation and other products. The focus of the assessment protocol described here is to identify all factors that contribute to the total energy and environmental impacts of different building insulation products and, more importantly, provide standardized determination methods that will allow comparison of different insulation material types. Further, the intent is not to replace current LCA standards but to provide a well-defined, easy-to-use comparison method for insulation materials using existing LCA guidelines. - Highlights: We proposed a protocol to evaluate the environmental impacts of insulation materials. The protocol considers all life cycle stages of an insulation material. Both the direct environmental impacts and the indirect impacts are defined. Standardized calculation methods for the avoided operational energy is defined. Standardized calculation methods for the avoided environmental impact is defined.

  19. Medical University of South Carolina Environmental Hazards Assessment Program. Volume 6: Annual report, July 1, 1993--June 30, 1994 deliverables

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Medical University of South Carolina`s vision is to become the premier national resource for medical information and for environmental/health risk assessment. A key component to the success of the many missions of the Environmental Hazards Assessment Program (EHAP) is timely access to large volumes of data. This study documents the results of the needs assessment effort conducted to determine the information access and processing requirements of EHAP. This report addresses the Department of Environmental Health Science, education and training initiative.

  20. Challenges to institutionalizing strategic environmental assessment: The case of Vietnam

    SciTech Connect (OSTI)

    Slunge, Daniel; Tran, Trang Thi Huyen

    2014-09-15

    Building on new institutional theory, this paper develops an analytical framework for analyzing constraints to the institutionalization of strategic environmental assessment (SEA) at four different institutional levels. The framework is tested in an empirical analysis of the environmental assessment system in Vietnam, which is a frontrunner among developing countries regarding the introduction and use of SEA. Building on interviews with Vietnamese and international experts, as well as an extensive literature review, we identify institutional constraints which challenge the effective use of SEA in Vietnam. We conclude that commonly identified constraints, such as inadequate training, technical guidelines, baseline data and financial resources, are strongly linked to constraints at higher institutional levels, such as incentives to not share information between ministries and severe restrictions on access to information and public participation. Without a thorough understanding of these institutional constraints, there is a risk that attempts to improve the use of SEA are misdirected. Thus, a careful institutional analysis should guide efforts to introduce and improve the use of SEA in Vietnam and other developing countries. The analytical framework for analyzing constraints to institutionalization of SEA presented in this paper represents a systematic effort in this direction. - Highlights: • A framework for analyzing constraints to institutionalizing SEA is developed • Empirical analysis of the strategic environmental assessment system in Vietnam • Constraints in the action arena linked to deeper institutional constraints • Institutional analysis needed prior to introducing SEA in developing countries.

  1. Evaluation of environmental impact assessment system in Pakistan

    SciTech Connect (OSTI)

    Nadeem, Obaidullah Hameed, Rizwan

    2008-11-15

    Environmental impact assessment (EIA) was first introduced in Pakistan based on the Environmental Protection Ordinance 1983. The EIA process was further strengthened under the Pakistan Environmental Protection Act 1997, which became operational under EIA Regulations 2000. Despite a sound legal basis and comprehensive guidelines, evidence suggests that EIA has not yet evolved satisfactorily in Pakistan. An evaluation of the EIA system against systematic evaluation criteria, based on interviews with EIA approval authorities, consulting firms and experts, reveals various shortcomings of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor EIA quality, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. Whilst shortcomings are challenging, central government has recently shown a high degree of commitment to the environmental protection by making EIA compulsory for all the public sector projects likely to have adverse environmental impacts. The paper identifies opportunities for taking advantage of the current environment for strengthening the EIA process.

  2. Rapid determination of 226Ra in environmental samples

    SciTech Connect (OSTI)

    Maxwell, Sherrod L.; Culligan, Brian K.

    2012-02-04

    A new rapid method for the determination of {sup 228}Ra in natural water samples has been developed at the SRNL/EBL (Savannah River National Lab/ Environmental Bioassay Laboratory) that can be used for emergency response or routine samples. While gamma spectrometry can be employed with sufficient detection limits to determine {sup 228}Ra in solid samples (via {sup 228}Ac) , radiochemical methods that employ gas flow proportional counting techniques typically provide lower MDA (Minimal Detectable Activity) levels for the determination of {sup 228}Ra in water samples. Most radiochemical methods for {sup 228}Ra collect and purify {sup 228}Ra and allow for {sup 228}Ac daughter ingrowth for ~36 hours. In this new SRNL/EBL approach, {sup 228}Ac is collected and purified from the water sample without waiting to eliminate this delay. The sample preparation requires only about 4 hours so that {sup 228}Ra assay results on water samples can be achieved in < 6 hours. The method uses a rapid calcium carbonate precipitation enhanced with a small amount of phosphate added to enhance chemical yields (typically >90%), followed by rapid cation exchange removal of calcium. Lead, bismuth, uranium, thorium and protactinium isotopes are also removed by the cation exchange separation. {sup 228}Ac is eluted from the cation resin directly onto a DGA Resin cartridge attached to the bottom of the cation column to purify {sup 228}Ac. DGA Resin also removes lead and bismuth isotopes, along with Sr isotopes and {sup 90}Y. La is used to determine {sup 228}Ac chemical yield via ICP-MS, but {sup 133}Ba can also be used instead if ICP-MS assay is not available. Unlike some older methods, no lead or strontium holdback carriers or continual readjustment of sample pH is required.

  3. PCBs as environmental estrogens: Turtle sex determination as a biomarker of environmental contamination

    SciTech Connect (OSTI)

    Bergeron, J.M.; Crews, D. ); McLachlan, J.A. )

    1994-09-01

    Polychlorinated biphenyls (PCBs) are widespread, low-level environmental pollutants associated with adverse health effects such as immune suppression and teratogenicity. There is increasing evidence that some PCB compounds are capable of disrupting reproductive and endocrine function in fish, birds, and mammals, including humans, particularly during development. Research on the mechanism through which these compounds act to alter reproductive function indicates estrogenic activity, whereby the compounds may be altering sexual differentiation. Here we demonstrate the estrogenic effect of some PCBs by reversing gonadal sex in a reptile species that exhibits temperature-dependent sex determination. 17 refs., 1 fig., 1 tab.

  4. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment

    SciTech Connect (OSTI)

    Irving, John S

    2003-04-01

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  5. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment - April 2003

    SciTech Connect (OSTI)

    Irving, J.S.

    2003-04-30

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  6. The mediation of environmental assessment's influence: What role for power?

    SciTech Connect (OSTI)

    Cashmore, Matthew; Axelsson, Anna

    2013-02-15

    Considerable empirical research has been conducted on why policy tools such as environmental assessment (EA) often appear to have 'little effect' (after Weiss) on policy decisions. This article revisits this debate but looks at a mediating factor that has received limited attention to-date in the context of EA - political power. Using a tripartite analytical framework, a comparative analysis of the influence and significance of power in mediating environmental policy integration is undertaken. Power is analysed, albeit partially, through an exploration of institutions that underpin social order. Empirically, the research examines the case of a new approach to policy-level EA (essentially a form of Strategic Environmental Assessment) developed by the World Bank and its trial application to urban environmental governance and planning in Dhaka mega-city, Bangladesh. The research results demonstrate that power was intimately involved in mediating the influence of the policy EA approach, in both positive (enabling) and negative (constraining) ways. It is suggested that the policy EA approach was ultimately a manifestation of a corporate strategy to maintain the powerful position of the World Bank as a leading authority on international development which focuses on knowledge generation. Furthermore, as constitutive of an institution and reflecting the worldviews of its proponents, the development of a new approach to EA also represents a significant power play. This leads us to, firstly, emphasise the concepts of strategy and intentionality in theorising how and why EA tools are employed, succeed and fail; and secondly, reflect on the reasons why power has received such limited attention to-date in EA scholarship. - Highlights: Black-Right-Pointing-Pointer Conducts empirical research on the neglected issue of power. Black-Right-Pointing-Pointer Employs an interpretation of power in which it is viewed as a productive phenomenon. Black-Right-Pointing-Pointer Analyses the

  7. Approach on environmental risk assessment of nanosilver released from textiles

    SciTech Connect (OSTI)

    Voelker, Doris; Schlich, Karsten; Hohndorf, Lars; Koch, Wolfgang; Kuehnen, Ute; Polleichtner, Christian; Kussatz, Carola; Hund-Rinke, Kerstin

    2015-07-15

    Based on the increased utilization of nanosilver (silver nanomaterials=AgNM) as antibacterial agent, there is the strong need to assess the potential environmental implication associated with its new application areas. In this study an exemplary environmental risk assessment (ERA) of AgNM applied in textiles was performed. Environmental exposure scenarios (via municipal sewage treatment plant (STP)) with wastewater supply from domestic homes) were developed for three different types of textiles equipped with AgNM. Based on these scenarios predicted environmental concentrations (PECs) were deduced for STPs and for the environmental compartments surface water, sediment as well as soil. These PECs were related to PNECs (predicted no effect concentrations). PNECs were deduced from results of ecotoxicity tests of a selected AgNM (NM-300K). Data on ecotoxicology were derived from various tests with activated sludge, cyanobacteria, algae, daphnids, fish, duckweed, macrophytes, chironomids, earthworms, terrestrial plants as well as soil microorganisms. Emission data for the AgNM NM-300K from textiles were derived from washing experiments. The performed ERA was based on the specifications defined in the ECHA Guidances on information requirements and chemical safety assessment. Based on the chosen scenarios and preconditions, no environmental risk of the AgNM NM-300K released from textiles was detected. Under conservative assumptions a risk quotient for surface water close to 1 indicated that the aquatic compartment may be affected by an increased emission of AgNM to the environment due to the high sensitivity of aquatic organisms to silver. Based on the successful retention of AgNM in the sewage sludge and the still ongoing continual application of sewage sludge on farmland it is recommended to introduce a threshold for total silver content in sewage sludge into the respective regulations. Regarding potential risk mitigation measures, it is emphasized to preferably directly

  8. Environmental impact assessment in Sri Lanka: A progress report

    SciTech Connect (OSTI)

    Butler, J.W.

    1995-12-01

    The paper reports on progress by the Government of Sri Lanka in the implementation of a formal environmental impact assessment (EIA) requirement. The authors have recently conducted several activities in Sri Lanka intended to improve the analytical quality of EIA documents and the utility of the EIA process in government decisionmaking, with particular attention to the use of programmatic or sectoral EIAs. The U.S. Agency for International Development established a 5-year project, the Natural Resources and Environmental Policy Project (NAREPP), to provide training and technical assistance in EIA and related disiplines for the Central Environmental Authority (CEA), several other Sri Lanka government agencies, and the private sector. This activity has involved efforts to expand the technical expertise within Sri Lanka for conducting EIA, which include developing EIA courses and materials in cooperation with several universities and conducting intensive training programs for both government and private-sector environmental professionals. This EIA will focus on the selection of government-approved industrial estates throughout the country, on which most new industrial development projects are to be located. Further training programs in the use of current analytical methodologies for EIA were also developed and conducted. The effectiveness of these activities can be assessed by evaluating changes in the content and quality of subsequent EIA documents and in the extent to which such documents affect environmental decisionmaking in Sri Lanka. The authors discuss the role of the programmatic EIA in the industrial development program of Sri Lanka, remaining constraints on the EIA process, and recommendations for further improvement.

  9. The screening and scoping of Environmental Impact Assessment and Strategic Environmental Assessment of Carbon Capture and Storage in the Netherlands

    SciTech Connect (OSTI)

    Koornneef, J.; Faaij, A.; Turkenburg, W.

    2008-08-15

    The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projects for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO{sub 2}. Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them.

  10. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    SciTech Connect (OSTI)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D&D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI).

  11. Environmental Impact Assessment in the Visegrad Group countries

    SciTech Connect (OSTI)

    Gałaś, Slávka; Gałaś, Andrzej; Zeleňáková, Martina; Zvijáková, Lenka; Fialová, Jitka; and others

    2015-11-15

    Highlights: • Comparison and evaluation of EIA systems in the V4 countries are presented. • Strengths and weaknesses of EIA systems based on a questionnaire survey are stated. • The function and efficiency of the EIA application in the V4 countries are analysed. • Irregularities and shortcomings of EIA systems in the V4 should be eliminated. The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA

  12. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    SciTech Connect (OSTI)

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  13. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment for Potential Land and Facilities Transfers

    Broader source: Energy.gov [DOE]

    DOE is evaluating the potential conveyance (lease, easement, and/or title transfer) of real property that may be determined to be excessed, underutilized or unneeded at the Paducah Gaseous Diffusion Plant (PGDP). After appropriate agency reviews, DOE could transfer PGDP real property to one or more entities for a range of economic development and/or recreational uses. DOEs potential action is designed to reduce the footprint of the site and the cost for maintenance of the site, providing opportunities for beneficial reuse. DOE prepared this Draft Environmental Assessment (EA) to analyze the potential environmental consequences associated with potential land and facilities transfers.

  14. EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment National Renewable Energy Laboratory's...

  15. Effectiveness of Environmental Impact Assessment system in Estonia

    SciTech Connect (OSTI)

    Heinma, Kaupo; Poder, Tonis

    2010-07-15

    To be effective, an Environmental Impact Assessment (EIA) system, first, has to minimize the probability that projects with significant environmental effects are implemented without EIA, and second, minimize the number of EIAs, which do not provide decision makers with essential information, so that the decision is improved as a result of EIA. The objective of this study was to find out how frequently in Estonia the projects implemented without EIA have caused significant environmental effects, and to measure the relative frequency of EIAs that have no influence on decision. An extensive survey with e-mail distributed questionnaires was carried out to reveal information from governmental agencies, local self-governments, and developers. There was no evidence that projects authorized without EIA have had environmental impacts, which could have been mitigated as a result of EIA. In contrast, about half of EIAs did not alter the decision of relevant authorities. This proportion was valid to both mandatory EIAs and those initiated on judgement basis. In our view, the proportion of no-influence EIAs was excessive and indicated the need to reconsider the provisions applying to the projects with a mandatory EIA requirement as well as judgements practice.

  16. Ecological compensation and Environmental Impact Assessment in Spain

    SciTech Connect (OSTI)

    Villarroya, Ana; Puig, Jordi

    2010-11-15

    To achieve meaningful sustainable development, Environmental Impact Assessment (EIA) should avoid the net losses in the environment resource base. But EIA practice does not always avoid the losses caused by the implementation of the projects under EIA regulation. Some environmental impacts are, simply, admitted, even without enforcing any form of compensation. When applied, compensation is sometimes just a monetary payment to offset the environmental loss. This paper looks for evidence on the role that compensation is given at present in EIA practice in Spain, and for some of its conceptual and regulatory roots. Specifically, it explores how compensation is addressed in 1302 records of decision (RODs) on those projects subject to the Spanish EIA regulation published during the years 2006 and 2007, to know how far Spain is from preserving the environmental resource base managed through this particular aspect of EIA practice. As a result, it is concluded that the practice of ecological compensation in EIA in Spain is much lower than it could be expected in a theoretical sustainability context committed to avoid net losses in the environment resource base, mainly due to an EIA practice focused on on-site mitigation that allows these net losses.

  17. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    SciTech Connect (OSTI)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  18. Environmental Hazards Assessment Program. Quarterly report, April--June 1995

    SciTech Connect (OSTI)

    1995-07-31

    The objectives of this report are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards, both chemical and radiation, on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes the progress made this quarter in the following areas: public and professional outreach; science programs; clinical programs; and information support and access systems.

  19. Draft environmental assessment -- Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Braun, J.B.; Irving, J.S.; Staley, C.S.; Stanley, N.

    1996-04-01

    The DOE-Idaho Operations Office has prepared an environmental assessment (EA) to analyze the environmental impacts of closing the Waste Calcining Facility (WCF) at the Idaho National Engineering Laboratory (INEL). The purpose of the action is to reduce the risk of radioactive exposure and release of radioactive and hazardous constituents and eliminate the need for extensive long-term surveillance and maintenance. DOE has determined that the closure is needed to reduce these risks to human health and the environment and to comply with Resource Conservation and Recovery Act requirements. The WCF closure project is described in the DOE Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (Programmatic EIS). DOE determined in the Programmatic EIS Record of Decision (ROD) that certain actions would be implemented and other actions deferred. The EA examined the potential environmental impacts of the proposed action and evaluated reasonable alternatives, including the no action alternative in accordance with the Council on Environmental Quality Regulations. Based on the analysis in the EA, the action will not have a significant effect on the human environment.

  20. ORISE: Completion of environmental assessment at ORNL a Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    success ORISE's completion of environmental assessment at ORNL is a Recovery Act success Exterior of K-33 superstructure at ORNL This 2.8 million-square-foot facility known as K-33 was formerly used to house a uranium-enrichment operation during the Manhattan Project. The superstructure was one of three dozen facilities ORISE characterized under the American Recovery and Reinvestment Act-an effort that proved to be challenging due to the complexity of the facilities and the project's

  1. Environmental Assessment for Final Rule, 10 CFR 43

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings" Baseline Standards Update (DOE/EA-1871) March 16, 2011 2 Environmental Assessment for Final Rule, 10 CFR 433, "Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings" and 10 CFR 435, "Energy Efficiency

  2. EA-1793: Draft Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    County, NV | Department of Energy 84: Fotowatio Nevada Solar, LLC's Apex Solar Power Project in Clark County, NV EA-1784: Fotowatio Nevada Solar, LLC's Apex Solar Power Project in Clark County, NV July 1, 2010 DOI-BLM-NV-S010-2010-0149-EA: Bureau of Land Management's Final Environmental Assessment Fotowatio Nevada Solar, LLC's APEX Solar Power Project in Clark County, Nevada October 1, 2010 EA-1784: Finding of No Significant Impact Fotowatio Nevada Solar, LLC's APEX Solar Power Project in

  3. Environmental Assessment for power marketing policy for Southwestern Power Administration

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described.

  4. Assessment of Environmentally Friendly Refrigerants for Window Air Conditioners

    SciTech Connect (OSTI)

    Bansal, Pradeep; Shen, Bo

    2014-01-01

    This paper presents technical assessment of environmentally friendly refrigerants for window air conditioners that currently use refrigerant R410A for residential and commercial applications. The alternative refrigerants that are studied for its replacement include R32, R600a, R290, R1234yf, R1234ze and a mixture of R32 (90% molar concentration) and R125 (10% molar concentration). Baseline experiments were performed on a window unit charged with R410A. The ORNL Heat Pump Design Model was calibrated with the baseline data and was used to assess the comparative performance of the WAC with alternative refrigerants. The paper discusses the advantages and disadvantages of each refrigerants and their suitability for window air conditioners.

  5. Assessment and evaluation of technologies for environmental restoration. Progress report

    SciTech Connect (OSTI)

    Uzochukwu, G.A.

    1999-01-15

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  6. Assessment and evaluation of technologies for environmental restoration. Progress report

    SciTech Connect (OSTI)

    Uzochukwu, G. A.

    2000-06-30

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  7. Terrestrial perturbation experiments as an environmental assessment tool

    SciTech Connect (OSTI)

    Suter, G.W. II

    1980-08-01

    The National Environmental Policy Act of 1969 (NEPA) was initially interpreted as requiring full disclosure of the environmental impacts of a federal action. Because of the limitations of time, money, and manpower, this requirement that all impacts be considered has led to superficial analysis of many important impacts. The President's Council on Environmental Quality (CEQ) has provided a solution to this problem by reinterpreting NEPA as requiring analysis of those impacts which have significant bearing on decision making. Because assessment resources can now be concentrated on a few critical issues, it should be possible to perform field perturbation experiments to provide direct evidence of the effects of a specific mixture of pollutants or physical disturbances on the specific receiving ecosystem. Techniques are described for field simulation of gaseous and particulate air pollution, soil pollutants, disturbance of the earth's surface, and disturbance of wildlife. These techniques are discussed in terms of their realism, cost, and the restrictions which they place on the measurement of ecological parameters.

  8. (Environmental impact assessment as applied to policies, plans and programs)

    SciTech Connect (OSTI)

    Sigal, L.L.

    1990-10-19

    A proposal to study the application of the principles of environmental impact assessment (EIA) to policy, plans, and programs was submitted by the US Environmental Protection Agency (EPA) to the Senior Advisors on Environmental and Water Problems of the United Nations Economic Commission. On approval, EPA asked Oak Ridge National Laboratory (ORNL) to support its efforts as lead participant on an international task force. ORNL is responsible for overall project management, including development of the report. At the first meeting in Geneva on June 18--19, there were representatives from Austria, Canada, Finland, Norway, Poland, Sweden, and the United Kingdom. The administrative/legal setting for EIA in each country was reviewed. The objectives of the task force were defined, and issues related to the application of EIA at the policy level were discussed. At the second meeting, in addition to those countries represented at the first meeting the Commission of Economic Communities, Czech and Slovak Federal Republic, Remark, Federal Republic of Germany, Hungary, and The Netherlands were represented. A brief review was given by the new participants of legal/administrative requirements for EIA in their countries. Case studies were presented by Canada, Finland, The Netherlands, Norway, Sweden, and the United States.

  9. National Wind Technology Center sitewide, Golden, CO: Environmental assessment

    SciTech Connect (OSTI)

    1996-11-01

    The National Renewable Energy Laboratory (NREL), the nation`s primary solar and renewable energy research laboratory, proposes to expand its wind technology research and development program activities at its National Wind Technology Center (NWTC) near Golden, Colorado. NWTC is an existing wind energy research facility operated by NREL for the US Department of Energy (DOE). Proposed activities include the construction and reuse of buildings and facilities, installation of up to 20 wind turbine test sites, improvements in infrastructure, and subsequent research activities, technology testing, and site operations. In addition to wind turbine test activities, NWTC may be used to support other NREL program activities and small-scale demonstration projects. This document assesses potential consequences to resources within the physical, biological, and human environment, including potential impacts to: air quality, geology and soils, water resources, biological resources, cultural and historic resources, socioeconomic resources, land use, visual resources, noise environment, hazardous materials and waste management, and health and safety conditions. Comment letters were received from several agencies in response to the scoping and predecisional draft reviews. The comments have been incorporated as appropriate into the document with full text of the letters contained in the Appendices. Additionally, information from the Rocky Flats Environmental Technology Site on going sitewide assessment of potential environmental impacts has been reviewed and discussed by representatives of both parties and incorporated into the document as appropriate.

  10. Theory versus practice in Strategic Environmental Assessment (SEA)

    SciTech Connect (OSTI)

    Lobos, Víctor; Partidario, Maria

    2014-09-15

    Could the theory of Strategic Environmental Assessment (SEA) be ahead of its time and decoupled from its practice? This paper evolved in search for this leading research question. Over the years the discourse on SEA experienced a gradual shift from the technocratic and rationalist thinking that supported its origin to more strategic approaches and integrated concepts, suggested since the mid 1990's. In this paper we share the results of our analysis of international thinking and practical experience with SEA. Results reveal that SEA practice changes very slowly when compared to advanced thinking supporting the noted shift. Current SEA practice shows to be still predominantly rooted in the logic of projects' environmental impact assessment (EIA). It is strongly bound to legal and regulatory requirements, and the motivation for its application persists being the delivery of environmental (or final) reports to meet legal obligations. Even though advanced SEA theoretical thinking claim its potential to help decisions to look forward, change mind-sets and the rationale of decision-making to meet sustainability challenges and enhance societal values, we note a weak relationship between the theoretical development of SEA and its practice. Why is this happening? Which factors explain this apparent inertia, resistance to change, in the SEA practice? Results appear to demonstrate the influence of assumptions, understandings, concepts, and beliefs in the use of SEA, which in turn suggest the political sensitivity of the instrument. - Highlights: • Theoretical thinking in SEA is ahead of its time. • SEA international practice reveals inertia to move out of project’ EIA comfort zone. • World current SEA practice show similar understandings of 30 years ago. • 100 world reports and survey of practitioners supported world review. • SEA great challenge is to change paradigms into new scientific complexity theories.

  11. Public participation in Strategic Environmental Assessment: A practitioners' perspective

    SciTech Connect (OSTI)

    Rega, Carlo; Baldizzone, Giorgio

    2015-01-15

    Public participation is considered a distinguished feature of Strategic Environmental Assessment (SEA), and the SEA literature has traditionally identified several benefits attached to it, from more open and transparent decision-making to greater acceptance of plans/programmes' output by the affected population. However, relatively little empirical evidence has been collected so far on the extent and outcomes of public engagement as it is being carried out in current SEA practice. In this article, we present the results of a study on this theme based on a direct survey of 47 SEA practitioners and scholars from different countries. Respondents were asked to report their experience about a number of items including: the frequency of SEA process featuring deep public participation; its overall influence on plan/programmme-making; the identification of the main factors impeding it; the correlation of public involvement with environmental outcomes; and the increase of costs. Results indicate that public engagement in current SEA practice is still relatively limited and with limited influence on decision-making. The main impeding factors seem to be: lack of political willingness by proponents; insufficient information on the SEA process by the public; and weakness of the legal frames. However, respondents also report that when effective public engagement takes place, benefits do arise and identify a positive correlation between the degree of public involvement and the environmental performance of plans and programmes. Overall, findings suggest that public involvement has indeed the potential to positively influence both SEA and decision-making, although this should be supported from the policy side by stronger legal frames, higher requirements and improved technical guidance. - Highlights: • 47 SEA scholars and practitioners were surveyed about public participation in SEA. • Current public involvement in SEA is still limited. • Lack of information, political

  12. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  13. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    SciTech Connect (OSTI)

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  14. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  15. Environmental Assessment for decommissioning the Strategic Petroleum Reserve Weeks Island Facility, Iberia Parish, Louisiana

    SciTech Connect (OSTI)

    1995-12-01

    The Strategic Petroleum Reserve (SPR) Weeks Island site is one of five underground salt dome crude oils storage facilities operated by the Department of Energy (DOE). It is located in Iberia Parish, Louisiana. The purpose of the proposed action is to decommission the Weeks Island crude oil storage after the oil inventory has been transferred to other SPR facilities. Water intrusion into the salt dome storage chambers and the development of two sinkholes located near the aboveground facilities has created uncertain geophysical conditions. This Environmental Assessment describes the proposed decommissioning operation, its alternatives, and potential environmental impacts. Based on this analyses, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) and has issued the Finding of No Significant Impact (FONSI).

  16. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    SciTech Connect (OSTI)

    N /A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  17. EA-1880: Notice of Intent to Prepare an Environmental Assessment and Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Public Meetings | Department of Energy Intent to Prepare an Environmental Assessment and Notice of Public Meetings EA-1880: Notice of Intent to Prepare an Environmental Assessment and Notice of Public Meetings Big Bend to Witten Transmission Line Project, South Dakota The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an Environmental Assessment with Scoping (EA) to meet its responsibilities under the National Environmental Policy Act (NEPA) and 7 CFR

  18. EA-2041: FERC Notice of Intent to Prepare an Environmental Assessment |

    Energy Savers [EERE]

    Department of Energy FERC Notice of Intent to Prepare an Environmental Assessment EA-2041: FERC Notice of Intent to Prepare an Environmental Assessment Cameron LNG Expansion Project The Federal Energy Regulatory Commission announced its intent to prepare an environmental assessment that examines the potential environmental impacts of the proposed construction of additional natural gas liquefaction and export facilities at the existing Cameron Liquefied Natural Gas Terminal in Cameron and

  19. Assessment of transboundary environmental effects in the Pearl River Delta Region: Is there a role for strategic environmental assessment?

    SciTech Connect (OSTI)

    Marsden, Simon

    2011-11-15

    China's EIA Law does not require transboundary proposals to be assessed, despite recognition of this globally, for example in the Espoo Convention and Kiev Protocol, and in the European EIA and SEA Directives. In a transboundary context assessment within a state is unusual, as regulating these effects is primarily about the relationship between states. However where a state has more than one legal system such as in the Pearl River Delta (PRD) Region of southern China, transboundary effects should also be addressed. Yet despite the geographical connections between Guangdong Province in mainland China (where the EIA Law applies) and the Hong Kong and Macau Special Administrative Regions (which have their own provisions, neither of which requires transboundary assessments), EIA and SEA are carried out separately. Coordinated or joint approaches to transboundary assessment are generally absent, with the legal autonomy of Hong Kong and Macau a major constraint. As a result institutional responses at the policy level have developed. The article considers global experiences with regulating transboundary EIA and SEA, and analyses potential application to land use, transport and air and water planning in the PRD Region. If applied, benefits may include prevention or mitigation of cumulative effects, broader public participation, and improvements to environmental governance. The PRD Region experience may encourage China to conduct and coordinate EIA and SEA processes with neighbouring states, which has been non-existent or extremely limited to date.

  20. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    SciTech Connect (OSTI)

    N /A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  1. Environmental Tracers for Determining Water Resource Vulnerability to Climate Change

    SciTech Connect (OSTI)

    Singleton, M

    2009-07-08

    Predicted changes in the climate will have profound impacts on water availability in the Western US, but large uncertainties exist in our ability to predict how natural and engineered hydrological systems will respond. Most predictions suggest that the impacts of climate change on California water resources are likely to include a decrease in the percentage of precipitation that falls as snow, earlier onset of snow-pack melting, and an increase in the number of rain on snow events. These processes will require changes in infrastructure for water storage and flood control, since much of our current water supply system is built around the storage of winter precipitation as mountain snow pack. Alpine aquifers play a critical role by storing and releasing snowmelt as baseflow to streams long after seasonal precipitation and the disappearance of the snow pack, and in this manner significantly impact the stream flow that drives our water distribution systems. Mountain groundwater recharge and, in particular, the contribution of snowmelt to recharge and baseflow, has been identified as a potentially significant effect missing from current climate change impact studies. The goal of this work is to understand the behavior of critical hydrologic systems, with an emphasis on providing ground truth for next generation models of climate-water system interactions by implementing LLNL capabilities in environmental tracer and isotopic science. We are using noble gas concentrations and multiple isotopic tracers ({sup 3}H/{sup 3}He, {sup 35}S, {sup 222}Rn, {sup 2}H/{sup 1}H, {sup 18}O/{sup 16}O, and {sup 13}C/{sup 12}C) in groundwater and stream water in a small alpine catchment to (1) provide a snapshot of temperature, altitude, and physical processes at the time of recharge, (2) determine subsurface residence times (over time scales ranging from months to decades) of different groundwater age components, and (3) deconvolve the contribution of these different groundwater components

  2. National Environmental Policy Act Hazards Assessment for the TREAT Alternative

    SciTech Connect (OSTI)

    Boyd D. Christensen; Annette L. Schafer

    2014-02-01

    This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

  3. National Environmental Policy Act Hazards Assessment for the TREAT Alternative

    SciTech Connect (OSTI)

    Boyd D. Christensen; Annette L. Schafer

    2013-11-01

    This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

  4. Environmental Hazards Assessment Program annual report, [June 1992--June 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis for the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.

  5. Avoiding climate change uncertainties in Strategic Environmental Assessment

    SciTech Connect (OSTI)

    Larsen, Sanne Vammen; Krnv, Lone; Driscoll, Patrick

    2013-11-15

    This article is concerned with how Strategic Environmental Assessment (SEA) practice handles climate change uncertainties within the Danish planning system. First, a hypothetical model is set up for how uncertainty is handled and not handled in decision-making. The model incorporates the strategies reduction and resilience, denying, ignoring and postponing. Second, 151 Danish SEAs are analysed with a focus on the extent to which climate change uncertainties are acknowledged and presented, and the empirical findings are discussed in relation to the model. The findings indicate that despite incentives to do so, climate change uncertainties were systematically avoided or downplayed in all but 5 of the 151 SEAs that were reviewed. Finally, two possible explanatory mechanisms are proposed to explain this: conflict avoidance and a need to quantify uncertainty.

  6. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    SciTech Connect (OSTI)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  7. Wild Horse 69-kV transmission line environmental assessment

    SciTech Connect (OSTI)

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  8. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  9. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  10. EA-1312: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Environmental Protection Agency' (EPA's) "Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings" (Title 40, Code of Federal Regulations, Part 192). ...

  11. Preliminary environmental assessment for the Satellite Power System (SPS). Revision 1. Volume 2. Detailed assessment

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The Department of Energy (DOE) is considering several options for generating electrical power to meet future energy needs. The satellite power system (SPS), one of these options, would collect solar energy through a system of satellites in space and transfer this energy to earth. A reference system has been described that would convert the energy to microwaves and transmit the microwave energy via directive antennas to large receiving/rectifying antennas (rectennas) located on the earth. At the rectennas, the microwave energy would be converted into electricity. The potential environmental impacts of constructing and operating the satellite power system are being assessed as a part of the Department of Energy's SPS Concept Development and Evaluation Program. This report is Revision I of the Preliminary Environmental Assessment for the Satellite Power System published in October 1978. It refines and extends the 1978 assessment and provides a basis for a 1980 revision that will guide and support DOE recommendations regarding future SPS development. This is Volume 2 of two volumes. It contains the technical detail suitable for peer review and integrates information appearing in documents referenced herein. The key environmental issues associated with the SPS concern human health and safety, ecosystems, climate, and electromagnetic systems interactions. In order to address these issues in an organized manner, five tasks are reported: (I) microwave-radiation health and ecological effects; (II) nonmicrowave health and ecological effectss; (III) atmospheric effects; (IV) effects on communication systems due to ionospheric disturbance; and (V) electromagnetic compatibility. (WHK)

  12. Public participation in environmental impact assessment: why, who and how?

    SciTech Connect (OSTI)

    Glucker, Anne N.; Driessen, Peter P.J.; Kolhoff, Arend; Runhaar, Hens A.C.

    2013-11-15

    Even a cursory glance at the literature on environmental impact assessment (EIA) reveals that public participation is being considered as an integral part of the assessment procedure. Public participation in EIA is commonly deemed to foster democratic policy-making and to render EIA more effective. Yet a closer look at the literature unveils that, beyond this general assertion, opinions of the precise meaning, objectives and adequate representation of public participation in EIA considerably diverge. Against this background, in this article we aim to provide a comprehensive overview of the academic debate on public participation in EIA concerning its meaning, objectives and adequate level of inclusiveness. In so doing, we hope to stimulate a more focused debate on the subject, which is key to advancing the research agenda. Furthermore, this paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA practice. -- Highlights: • There is little reflection on the meaning, objectives and adequate level of inclusiveness of public participation in EIA. • We provide a comprehensive overview of the academic debate on public participation in EIA concerning the meaning, objectives and adequate level of inclusiveness. • Theoretical claims put forth by scholars are contrasted with empirical evidence. • Overview shall stimulate a more focused debate on the subject. • This paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA.

  13. Compensatory mitigation and screening rules in environmental impact assessment

    SciTech Connect (OSTI)

    Macintosh, Andrew Waugh, Lauren

    2014-11-15

    Concerns about the effectiveness of environmental impact assessment (EIA) have prompted proposals to improve its performance by limiting the discretion of decision-makers in screening. To investigate whether such proposals are likely to generate the desired results, we conducted an evaluation of the screening process under the Australian government's EIA regime from its introduction on 16 July 2000 to 30 June 2013 (study period). Almost 1 in 5 ‘particular manner’ decisions—a type of screening decision under the regime—were found to be unlawful. The extent of non-compliance is explained on the basis of convenience. The department was required to assess a large number of projects under tight timeframes and with limited resources, while being pressured by proponents to allow their projects to bypass EIA. These pressures resulted in the development of an informal custom whereby the formal compensatory mitigation restrictions were frequently ignored. The results highlight the relative significance of formal and informal institutions in EIA. Formal EIA rules typically provide a mere outline of the process. The informal institutions adopted by administrators often have a greater influence on how the process operates and what it achieves. - Highlights: • Concerns about the effectiveness of environmental impact assessment (EIA) have prompted proposals to improve its performance by limiting the discretion of decision-makers in screening. • To investigate whether such proposals are likely to generate the desired results, we conducted an evaluation of the Australian government's screening process, looking at the extent of compliance with a formal prohibition on the consideration of compensatory mitigation. • Almost 1 in 5 ‘particular manner’ decisions – a type of screening decision under the regime – were found to be unlawful (with a 95% confidence interval of between 1:4 and 1:7) because of a failure to abide by the compensatory mitigation restrictions

  14. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  15. DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a...

  16. Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

    SciTech Connect (OSTI)

    Annette L. Schafer; LLoyd C. Brown; David C. Carathers; Boyd D. Christensen; James J. Dahl; Mark L. Miller; Cathy Ottinger Farnum; Steven Peterson; A. Jeffrey Sondrup; Peter V. Subaiya; Daniel M. Wachs; Ruth F. Weiner

    2014-02-01

    This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on

  17. Environmental Management System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  18. Legal and institutional framework of environmental impact assessment in Nigeria: An initial assessment

    SciTech Connect (OSTI)

    Olokesusi, F.

    1998-03-01

    Nigeria, the most populous country in Africa, has high rates of urbanization and industrialization. Until recently, decisions on most large-scale projects such as expressways, harbors, industries, dams, and irrigation were considered with an emphasis on traditional technical and cost-benefit analysis. Spurred by massive environmental degradation and persistent community agitation in oil producing areas, environmental impact assessment (EIA) legislation was passed in late 1992. The main purpose of this article is to review and assess the content of this legislation and the guidelines produced by the Federal Environmental Protection Agency (FEPA), the institution responsible for EIA administration. Some EIA reports have been prepared and reviewed by FEPA since 1994. There are some positive outcomes and expectations, but some problems have been identified as well, including: deliberate restriction of public involvement and participation by proponents and/or their consultants, interagency conflict leading to high cost and project delays especially in the oil industry, and restriction of public access to final EIA reports. These are discussed, and recommendations for improving the process are made.

  19. Spheres of public conversation: Experiences in strategic environmental assessment

    SciTech Connect (OSTI)

    Illsley, Barbara; Jackson, Tony; Deasley, Neil

    2014-01-15

    This paper draws on earlier research, a national review of Scottish SEA practice and a survey of practitioners and stakeholders engaged in SEA and spatial planning in one Scottish city-region, to explore claims being made in the academic literature for Strategic Environmental Assessment (SEA) as a tool for deliberative plan-making. We consider whether there is evidence that Scottish SEA practice is helping create more inclusive plan-making processes in light of recent legislative changes, thereby fulfilling one of the expectations of Scottish Government. The macro analysis found that although there are opportunities for stakeholders to engage in the Scottish SEA process the level in practice is extremely low, a finding which mirrors experience in England and elsewhere. The more detailed micro analysis reveals a more nuanced picture within the spatial planning system, however, suggesting the existence of two distinct spheres of public conversations, one characterised by active dialogue about the environmental effects of alternative strategies amongst public sector stakeholders and the other involving non-governmental stakeholders and community groups in a much more limited way. The paper concludes with a discussion of possible explanations for this outcome, concerning asymmetric incentive structures and the application of power, and a consideration of the implications in relation to the competing discourses of SEA. -- Highlights: We examine the extent to which Scottish SEA is helping promote inclusive plan-making. Low levels of stakeholder engagement generally in Scottish SEA. Stronger SEA dialogue amongst public agencies than with the wider community. Importance of incentive structures and power capture in framing SEA public conversations.

  20. Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nationwide Greenhouse Gas Emissions | Department of Energy Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1: Nationwide Greenhouse Gas Emissions Environmental Assessment of Plug-In Hybrid Electric Vehicles Volume 1: Nationwide Greenhouse Gas Emissions In the most comprehensive environmental assessment of electric transportation to date, the Electric Power Research Institute (EPRI) and the Natural Resources Defense Council (NRDC) are examining the greenhouse gas emissions

  1. Strategic Target Systems (STARS) environmental assessment. Supplement. Final report

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    The Strategic Target System program (STARS) uses a three-stage solid propellant guided missile. The missile integrates selected parts of the Navy retired Polaris A3 fleet ballistic missile with a substantial number of newly developed subsystems. STARS will be used for testing various developmental elements of the Strategic Defense Initiative System. STARS will fly a payload of either single or multiple reentry vehicles to the Broad Ocean Area or will be targeted for impact or for reentry. As part of the STARS development process, an EA was prepared. It concluded with a finding of no significant impact (FNSI). The Army determined that the STARS program would have no significant environmental impacts and that any potential impacts could be mitigated. However, as a result of lawsuits the court ordered that a supplemental study be conducted of the potential effects on the Kauai environment from hydrogen chloride released during STARS launches and that a determination be made as to whether the release of freon from the second stage of the STARS would violate the Hawaii Ozone Layer Protection Statute.

  2. EIS-0493: FERC Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Intent to Prepare an Environmental Assessment Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  3. EA-1971: FERC Notice of Intent to Prepare an Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Intent to Prepare an Environmental Assessment Golden Pass LNG Export and Pipeline Project, Texas and Louisiana The Federal Energy Regulatory Commission (FERC)...

  4. Text Alternative Version: Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "Life-Cycle Assessment of Energy and Environmental Impacts of LED Lighting Products" webcast, held March 28, 2013.

  5. Environmental Assessment and Finding of No Significant Impact: Implementation of the Wetland Mitigation Bank Program at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-04-28

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1205) for the proposed implementation of a wetland mitigation bank program at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  6. Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site

    SciTech Connect (OSTI)

    N /A

    1999-09-27

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  7. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    SciTech Connect (OSTI)

    N /A

    2002-08-13

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA).

  8. The environmental assessment of nuclear materials disposition options: A transportation perspective

    SciTech Connect (OSTI)

    Wilson, R.K.; Clauss, D.B.; Moyer, J.W.

    1995-12-31

    The US Department of Energy has undertaken a program to evaluate and select options for the long-term storage and disposition of fissile materials declared surplus to defense needs as a result of the end of the Cold War. The transport of surplus fissile material will be an important and highly visible aspect of the environmental impact studies and other planning documents required for implementation of the disposition options. This report identifies the roles and requirements for transportation of fissile materials in the program and discusses an existing methodology for determining the environmental impact in terms of risk. While it will be some time before specific alternatives are chosen that will permit the completion of detailed risk calculations, the analytical models for performing the probabilistic risk assessments already exist with much of the supporting data related to the transportation system. This report summarizes the various types of data required and identifies sources for that data.

  9. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE; LIGHT BULBS; ...

  10. EA-1722-SA-001: Supplement Analysis for an Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, OH This Supplement Analysis evaluates the potential environmental impacts of the proposed...

  11. The National Environmental Policy Act net (NEPAnet) and DOE NEPA Web: What they bring to environmental impact assessment

    SciTech Connect (OSTI)

    Jessee, L.

    1998-01-01

    The US National Environmental Policy Act of 1969 (NEPA) requires agencies to use a systematic, interdisciplinary approach to ensure integrated use of natural and social sciences and the environmental design arts in planning and decision-making. Numerous environmental analyses have been prepared that contain valuable information about regions and ecosystems, but these data were not stored in a retrievable manner. In 1993 and 1994, agency-specific NEPA and related datasets were consolidated into the US Department of Energy NEPA Web and NEPAnet. These improve the efficiency and effectiveness of the environmental impact assessment/NEPA process in the US.

  12. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect (OSTI)

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: This is a comparative analysis of SEA in strategic spatial planning in Italy. The adhesion of Provinces to the study is remarkable. SEA implementation and integration into spatial planning is still moderate. Participation via consultations should be more widespread. Monitoring and institution of observatories are still in an infancy stage.

  13. Power and environmental assessment: Introduction to the special issue

    SciTech Connect (OSTI)

    Cashmore, Matthew; Richardson, Tim

    2013-02-15

    The significance of politics and power dynamics has long been recognised in environmental assessment (EA) research, but there has not been sustained attention to power, either theoretically or empirically. The aim of this special issue is to encourage the EA community to engage more consistently with the issue of power. The introduction represents a ground-clearing exercise intended to clarify the terms of the debate about power in the EA field, and to contribute to the development of a research agenda. Research trends in the field are outlined, and potential analytic and normative lines of inquiry are identified. The contributions to this special issue represent contrasting conceptual and methodological approaches that navigate the analytical and normative terrain of power dynamics in EA. Together, they demonstrate that power cannot be removed from EA policy or practices, and is a necessary research focus for the development of the field. - Highlights: Black-Right-Pointing-Pointer Introduces the themed section on power Black-Right-Pointing-Pointer Provides an overview of the papers in the themed section Black-Right-Pointing-Pointer Identifies research trends and directions for future research.

  14. Transportation of radionuclides in urban environs: draft environmental assessment

    SciTech Connect (OSTI)

    Finley, N.C.; Aldrich, D.C.; Daniel, S.L.; Ericson, D.M.; Henning-Sachs, C.; Kaestner, P.C.; Ortiz, N.R.; Sheldon, D.D.; Taylor, J.M.

    1980-07-01

    This report assesses the environmental consequences of the transportation of radioactive materials in densely populated urban areas, including estimates of the radiological, nonradiological, and social impacts arising from this process. The chapters of the report and the appendices which follow detail the methodology and results for each of four causative event categories: incident free transport, vehicular accidents, human errors or deviations from accepted quality assurance practices, and sabotage or malevolent acts. The numerical results are expressed in terms of the expected radiological and economic impacts from each. Following these discussions, alternatives to the current transport practice are considered. Then, the detailed analysis is extended from a limited area of New York city to other urban areas. The appendices contain the data bases and specific models used to evaluate these impacts, as well as discussions of chemical toxicity and the social impacts of radioactive material transport in urban areas. The latter are evaluated for each causative event category in terms of psychological, sociological, political, legal, and organizational impacts. The report is followed by an extensive bibliography covering the many fields of study which were required in performing the analysis.

  15. Assessment of produced water contaminated soils to determine remediation requirements

    SciTech Connect (OSTI)

    Clodfelter, C.

    1995-12-31

    Produced water and drilling fluids can impact the agricultural properties of soil and result in potential regulatory and legal liabilities. Produced water typically is classified as saline or a brine and affects surface soils by increasing the sodium and chloride content. Sources of produced water which can lead to problems include spills from flowlines and tank batteries, permitted surface water discharges and pit areas, particularly the larger pits including reserve pits, emergency pits and saltwater disposal pits. Methods to assess produced water spills include soil sampling with various chemical analyses and surface geophysical methods. A variety of laboratory analytical methods are available for soil assessment which include electrical conductivity, sodium adsorption ratio, cation exchange capacity, exchangeable sodium percent and others. Limiting the list of analytical parameters to reduce cost and still obtain the data necessary to assess the extent of contamination and determine remediation requirements can be difficult. The advantage to using analytical techniques is that often regulatory remediation standards are tied to soil properties determined from laboratory analysis. Surface geophysical techniques can be an inexpensive method to rapidly determine the extent and relative magnitude of saline soils. Data interpretations can also provide an indication of the horizontal as well as the vertical extent of impacted soils. The following discussion focuses on produced water spills on soil and assessment of the impacted soil. Produced water typically contains dissolved hydrocarbons which are not addressed in this discussion.

  16. Environmental impact assessment in the Philippines: Progress, problems, and directions for the future

    SciTech Connect (OSTI)

    Ross, W.A. )

    1994-07-01

    The environmental impact statement (EIS) system of the Philippines is reviewed, identifying progress made in its effective implementation since 1986. Improvement in coverage is noted and real commitment to good environmental impact assessment (EIA) practice is found in those responsible for the EIS system. Project proponents show a modest acceptance of the system. Major problems remaining are: (1) the EIS system is seen as a bureaucratic requirement needed to obtain project approvals; (2) political interference determines the outcome of some environmental reviews; (3) questionable practices by public servants serve to discredit the system; and (4) the treatment of projects in environmentally critical areas is less than satisfactory. Based on the principle that it is essential to establish a credible process seen to work effectively by the public, politicians, the government bureaucracy, and proponents, suggestions for improvement are made. They deal with the treatment of EISs for projects already under construction, EIA training courses, and simple adjustments to the EIS system to focus it on the most important projects.

  17. The role of Life Cycle Assessment in identifying and reducing environmental impacts of CCS

    SciTech Connect (OSTI)

    Sathre, Roger; Masanet, Eric; Cain, Jennifer; Chester, Mikhail

    2011-04-20

    Life Cycle Assessment (LCA) should be used to assist carbon capture and sequestration (CCS) planners to reduce greenhouse gas (GHG) emissions and avoid unintended environmental trade-offs. LCA is an analytical framework for determining environmental impacts resulting from processes, products, and services. All life cycle stages are evaluated including raw material sourcing, processing, operation, maintenance, and component end-of-life, as well as intermediate stages such as transportation. In recent years a growing number of LCA studies have analyzed CCS systems. We reviewed 50+ LCA studies, and selected 11 studies that compared the environmental performance of 23 electric power plants with and without CCS. Here we summarize and interpret the findings of these studies. Regarding overall climatemitigation effectiveness of CCS, we distinguish between the capture percentage of carbon in the fuels, the net carbon dioxide (CO2) emission reduction, and the net GHG emission reduction. We also identify trade-offs between the climate benefits and the potential increased non-climate impacts of CCS. Emissions of non-CO2 flue gases such as NOx may increase due to the greater throughput of fuel, and toxicity issues may arise due to the use of monoethanolamine (MEA) capture solvent, resulting in ecological and human health impacts. We discuss areas where improvements in LCA data or methods are needed. The decision to implement CCS should be based on knowledge of the overall environmental impacts of the technologies, not just their carbon capture effectiveness. LCA will be an important tool in providing that knowledge.

  18. Initial Assessment of Environmental Barrier Coatings for the Prometheus Project

    SciTech Connect (OSTI)

    M. Frederick

    2005-12-15

    Depending upon final design and materials selections, a variety of engineering solutions may need to be considered to avoid chemical degradation of components in a notional space nuclear power plant (SNPP). Coatings are one engineered approach that was considered. A comprehensive review of protective coating technology for various space-reactor structural materials is presented, including refractory metal alloys [molybdenum (Mo), tungsten (W), rhenium (Re), tantalum (Ta), and niobium (Nb)], nickel (Ni)-base superalloys, and silicon carbide (Sic). A summary description of some common deposition techniques is included. A literature survey identified coatings based on silicides or iridium/rhenium as the primary methods for environmental protection of refractory metal alloys. Modified aluminide coatings have been identified for superalloys and multilayer ceramic coatings for protection of Sic. All reviewed research focused on protecting structural materials from extreme temperatures in highly oxidizing conditions. Thermodynamic analyses indicate that some of these coatings may not be protective in the high-temperature, impure-He environment expected in a Prometheus reactor system. Further research is proposed to determine extensibility of these coating materials to less-oxidizing or neutral environments.

  19. A critical review of environmental assessment tools for sustainable urban design

    SciTech Connect (OSTI)

    Ameen, Raed Fawzi Mohammed; Mourshed, Monjur; Li, Haijiang

    2015-11-15

    Cities are responsible for the depletion of natural resources and agricultural lands, and 70% of global CO{sub 2} emissions. There are significant risks to cities from the impacts of climate change in addition to existing vulnerabilities, primarily because of rapid urbanization. Urban design and development are generally considered as the instrument to shape the future of the city and they determine the pattern of a city's resource usage and resilience to change, from climate or otherwise. Cities are inherently dynamic and require the participation and engagement of their diverse stakeholders for the effective management of change, which enables wider stakeholder involvement and buy-in at various stages of the development process. Sustainability assessment of urban design and development is increasingly being seen as indispensable for informed decision-making. A sustainability assessment tool also acts as a driver for the uptake of sustainable pathways by recognizing excellence through their rating system and by creating a market demand for sustainable products and processes. This research reviews six widely used sustainability assessment tools for urban design and development: BREEAM Communities, LEED-ND, CASBEE-UD, SBTool{sup PT}–UP, Pearl Community Rating System (PCRS) and GSAS/QSAS, to identify, compare and contrast the aim, structure, assessment methodology, scoring, weighting and suitability for application in different geographical contexts. Strengths and weaknesses of each tool are critically discussed. The study highlights the disparity in local and international contexts for global sustainability assessment tools. Despite their similarities in aim on environmental aspects, differences exist in the relative importance and share of mandatory vs optional indicators in both environmental and social dimensions. PCRS and GSAS/QSAS are new incarnations, but have widely varying shares of mandatory indicators, at 45.4% and 11.36% respectively, compared to 30% in

  20. Draft Environmental Assessment for the High Explosive Science and Engineering Facility Pantex Plant

    National Nuclear Security Administration (NNSA)

    DRAFT DOE/EA-1993 U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL ASSESSMENT FOR THE HIGH EXPLOSIVE SCIENCE AND ENGINEERING FACILITY PANTEX PLANT * AMARILLO, TEXAS * 2015 Draft Environmental Assessment for the High Explosive Science and Engineering Facility Pantex Plant August 2015 TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................................... 1 2.0 BACKGROUND

  1. DOE Issues Environmental Assessment on Road Project for Public Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issues 88th Lessons Learned Quarterly Report DOE Issues 88th Lessons Learned Quarterly Report September 1, 2016 - 2:59pm Addthis The 88th Lessons Learned Quarterly Report highlights the Council on Environmental Quality final guidance on climate change, U.S. Fish and Wildlife Service migratory bird training, an updated Environmental Protection Agency screening tool for environmental justice analysis, and contributions by our summer interns. Addthis Related Articles DOE Issues 86th Lessons Learned

  2. Assessment of cold-climate environmental research priorities

    SciTech Connect (OSTI)

    States, J.B.

    1983-04-01

    The Environmental Protection Agency (EPA) has consistently recognized that cold regions pose unique environmental problems. This report sets forth the conceptual framework and research plans for several high priority research areas. It provides the fundamental basis for implementation of the EPA Cold-Climate Environmental Research Program. This three- to five-year program encompasses both short- and long-term research of high relevance to the EPA and to the cold regions that it serves.

  3. Life-Cycle Assessment of Energy and Environmental Impacts of...

    Office of Scientific and Technical Information (OSTI)

    Part 2: LED Manufacturing and Performance Scholand, Michael; Dillon, Heather E. 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; ENVIRONMENTAL IMPACTS; LIFE CYCLE;...

  4. EA-1321: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York This EA evaluates the environmental impacts for ...

  5. EA-1942: Notice of Intent to Prepare an Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    that examines the potential environmental impacts of a proposal to add natural gas liquefaction and export capabilities to the existing Cove Point LNG Terminal located on the...

  6. EA-2014: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    DOE orders, is survivable and sustainable for 72 hours, and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Gold Certification. ...

  7. EA-2014: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE orders, is survivable and sustainable for 72 hours, and achieves the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Gold Certification. ...

  8. EA-1037: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Uranium Lease Management Program This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve ...

  9. EA-1947: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the potential environmental impacts of partial andor complete demolition of some KCP structures. EA-1947-FEA-2013.pdf (4.72 MB) More Documents & Publications EA-1947: Draft

  10. EA-0843: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-0843-FEA-19943.pdf More Documents & Publications DOE Comments - Radiation Protection (Atomic Energy Act) EIS-0290: Final Environmental Impact Statement Audit Report: IG-0454

  11. EA-1969: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho. ...

  12. Final Site-Wide Environmental Assessment of National Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    environmental and energy security benefits likely to result from expanding the domestic and worldwide use of wind energy by fostering a world- class, domestic wind industry. ...

  13. EA-1451: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    The purpose of the USEC Gas Centrifuge R&D Project is to develop an economically attractive gas centrifuge machine and process using DOE's centrifuge technology. Environmental ...

  14. EA-1093: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surface Water Drainage System This EA evaluates the environmental impacts of the proposal to correct deficiencies in, and then to maintain, the surface water drainage system ...

  15. EA-1904: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, CA This EA evaluates the environmental impacts of the proposed construction of the Linac ...

  16. DOE/EA-1494 Final Environmental Assessment for Activities Using

    National Nuclear Security Administration (NNSA)

    ... of Conservation and Natural Resources, Division of Environmental Protection, Bureau of Air Pollution Control (BAPC) administers the Clean Air Act within the state of Nevada. ...

  17. EA-1897: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Newberry EGS Demonstration EIS-0207: Final Environmental Impact Statement track 4: enhanced geothermal systems (EGS) | geothermal 2015 peer review...

  18. EA-1884: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This EA evaluates the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's...

  19. DOE/EA-1760 Final Environmental Assessment for FutureFuel Chemical Company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Final Environmental Assessment for FutureFuel Chemical Company Electric Drive Vehicle Battery and Component Manufacturing Initiative Project Batesville, AR August 2010 Prepared for: Department of Energy National Energy Technology Laboratory Electric Drive Vehicle Battery and DOE/EA-1760 Component Manufacturing Initiative Project Environmental Assessment FutureFuel Chemical Company, Batesville, AR August 2010 National Environmental Policy Act (NEPA) Compliance Cover Sheet Proposed Action: The

  20. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental

  1. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  2. Environmental Decision Making and Information Technology: Issues Assessment

    SciTech Connect (OSTI)

    Barg, S.; Fletcher, T.; Mechling, J.; Tonn, B.; Turner, R.

    1999-05-01

    This report presents a summary of the Information Technology and Environmental Decision Making Workshop that was held at Harvard University, October 1-3, 1998. Over sixty participants from across the US took part in discussions that focused on the current practice of using information technology to support environmental decision making and on future considerations of information technology development, information policies, and data quality issues in this area. Current practice is focusing on geographic information systems and visualization tools, Internet applications, and data warehousing. In addition, numerous organizations are developing environmental enterprise systems to integrate environmental information resources. Plaguing these efforts are issues of data quality (and public trust), system design, and organizational change. In the future, much effort needs to focus on building community-based environmental decision-making systems and processes, which will be a challenge given that exactly what needs to be developed is largely unknown and that environmental decision making in this arena has been characterized by a high level of conflict. Experimentation and evaluation are needed to contribute to efficient and effective learning about how best to use information technology to improve environmental decision making.

  3. Walking the sustainability assessment talk - Progressing the practice of environmental impact assessment (EIA)

    SciTech Connect (OSTI)

    Morrison-Saunders, Angus; Retief, Francois

    2012-09-15

    Internationally there is a growing demand for environmental impact assessment (EIA) to move away from its traditional focus towards delivering more sustainable outcomes. South Africa is an example of a country where the EIA system seems to have embraced the concept of sustainability. In this paper we test the existing objectives for EIA in South Africa against sustainability principles and then critique the effectiveness of EIA practice in delivering these objectives. The outcome of the research suggests that notwithstanding a strong and explicit sustainability mandate through policy and legislation, the effectiveness of EIA practice falls far short of what is mandated. This shows that further legislative reform is not required to improve effectiveness but rather a focus on changing the behaviour of individual professionals. We conclude by inviting further debate on what exactly practitioners can do to give effect to sustainability in EIA practice.

  4. EA-0531: Final Environmental Assessment | Department of Energy

    Energy Savers [EERE]

    Program for Naval Oil Shale Reserves Nos. 1 and 3 This EA evaluates the environmental impacts of a proposal for a Natural Gas Protection Program for Naval Oil Shale Reserves Nos. ...

  5. EA-1212: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lease of Land for the Development of a Research Park at Los Alamos National Laboratory This EA evaluates the environmental impacts for the proposal to lease undeveloped land that ...

  6. EA-1871: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    This EA evaluates the potential environmental impacts of revising the Federal building energy efficiency standars to ASHRAE 90.1-2007 and IECC 2009. EA-1871-FEA-2011.pdf (295.14 ...

  7. EA-1948: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration prepared an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines ...

  8. EA-1948: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile ...

  9. EA-1947: Notice of Intent to Prepare an Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    EA-1947-NOI-2012 (198.46 KB) More Documents & Publications EIS-0475: Notice of Intent To Prepare an Environmental Impact Statement and Notice of Wetlands Involvement EA-1947: Draft ...

  10. Final Site-Wide Environmental Assessment of the National Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... document NREL prepared for the STM site in 1993. DOE defines a Site-Wide environmental ... of National Fire Protection Association (NFPA) 13 for an Ordinary Hazard, Group 2 area. ...

  11. EA-1147: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Low Energy Demonstration Accelerator Tech Area 53 This EA evaluates the environmental impacts that would be expected to occur if the Department of Energy were to design, build, and...

  12. EA-1895: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA to evaluate the potential environmental impacts of replacing an existing seasonal fish weir with a permanent weir, which would be used to monitor federally-listed Snake River...

  13. EA-1814: Final Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    deliver heat to a complex of both State-owned and City-owned municipal buildings and schools. This EA analyzes the foreseeable environmental impacts of the proposed project and...

  14. Draft Environmental Assessment for Direct Final Rule, 10 CFR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Regulations CH 4 methane CO 2 carbon dioxide CO carbon monoxide CSAPR Cross-State Air Pollution Rule D.C. District of Columbia DOE Department of Energy EA environmental ...

  15. A macro environmental risk assessment methodology for establishing priorities among risks to human health and the environment in the Philippines

    SciTech Connect (OSTI)

    Gernhofer, S.; Oliver, T.J.; Vasquez, R.

    1994-12-31

    A macro environmental risk assessment (ERA) methodology was developed for the Philippine Department of Environment and Natural Resources (DENR) as part of the US Agency for International Development Industrial Environmental Management Project. The DENR allocates its limited resources to mitigate those environmental problems that pose the greatest threat to human health and the environment. The National Regional Industry Prioritization Strategy (NRIPS) methodology was developed as a risk assessment tool to establish a national ranking of industrial facilities. The ranking establishes regional and national priorities, based on risk factors, that DENR can use to determine the most effective allocation of its limited resources. NRIPS is a systematic framework that examines the potential risk to human health and the environment from hazardous substances released from a facility, and, in doing so, generates a relative numerical score that represents that risk. More than 3,300 facilities throughout the Philippines were evaluated successfully with the NRIPS.

  16. Proposed Fermilab fixed target experiment: Kaons at the Tevatron. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0898, evaluating the impacts associated with the proposed fixed target experiment at the Fermi National Accelerator Laboratory (Femilab) in Batavia, Illinois, known as Kaons at the Tevatron (KTeV). The proposed KTeV project includes reconfiguration of an existing target station, enhancement of an existing beam transport system connected to existing utility facilities, and construction of a new experimental detector hall area. The study of the K meson, a type of subatomic particle, has been going on at Fermilab for 20 years. The proposed KTEV project advances the search for the origins of a violation of a fundamental symmetry of nature called charge parity (CP) violation. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

  17. Environmental Restoration Program waste minimization and pollution prevention self-assessment

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The Environmental Restoration (ER) Program within Martin Marietta Energy Systems, Inc. is currently developing a more active waste minimization and pollution prevention program. To determine areas of programmatic improvements within the ER Waste Minimization and Pollution Prevention Awareness Program, the ER Program required an evaluation of the program across the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Paducah Environmental Restoration and Waste Minimization Site, and the Portsmouth Environmental Restoration and Waste Minimization Site. This document presents the status of the overall program as of fourth quarter FY 1994, presents pollution prevention cost avoidance data associated with FY 1994 activities, and identifies areas for improvement. Results of this assessment indicate that the ER Waste Minimization and Pollution Prevention Awareness Program is firmly established and is developing rapidly. Several procedural goals were met in FY 1994 and many of the sites implemented ER waste minimization options. Additional growth is needed, however, for the ER Waste Minimization and Pollution Prevention Awareness Program.

  18. A state-impact-state methodology for assessing environmental impact in land use planning

    SciTech Connect (OSTI)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). Matter-element (ME) and Extenics methods were embedded in the LUPEA. The model was applied to the LUPEA of Zoucheng County. The assessment shows improving environment quality since 2000 in Zoucheng County. The method provides a useful tool for the LUPEA in the county level.

  19. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  20. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.