  1. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  2. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  3. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  4. How to Determine and Verify Operating and Maintenance Savings in Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Savings Performance Contracts | Department of Energy Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts Document describes guidance on operations and maintenance savings determination and verification within the energy savings performance contracts. PDF icon 10_4_determineverifyomsavings.pdf More Documents & Publications

  5. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance ...

  6. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  7. CX-009527: Categorical Exclusion Determination | Department of Energy

    Energy Savers [EERE]

    27: Categorical Exclusion Determination CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project The planned routine maintenance activities will address the needed site-wide routine maintenance activities to comply with the requirements of the Cooperative Agreement between NYSERDA and DOE and with DOE Order 430.1B. PDF icon CX-009527.pdf More Documents &

  8. CX-008790: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and

  9. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance....

  10. DOE-CX-00073-Rev2-Routine-Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  11. CX-00069_PNNL_Routine_Maintenance_300_Area.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  12. CX_00073_CHPRC_Annual_Routine_Maintenance.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  13. Categorical Exclusion Determinations: B1.3

    Broader source: Energy.gov [DOE]

    B1.3: Routine maintenanceRoutine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but not limited to, pathways, roads, and...

  14. CX-010110: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine

  15. CX-012764: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    764: Categorical Exclusion Determination CX-012764: Categorical Exclusion Determination Kayenta-Navajo 230 Kilovolt Transmission Line Access Road Maintenance Coconini and Navajo Counties, Arizona CX(s) Applied: B1.3 Date: 41872 Location(s): Arizona Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to conduct routine road maintenance on its existing access roads along the Kayenta-Navajo 230 kilovolt Transmission Line.

  16. CX-011847: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-011847: Categorical Exclusion Determination Routine Maintenance Activities CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, ...

  17. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  18. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th...

  19. CX-009630: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    ICP Routine Maintenance CX(s) Applied: B1.3 Date: 11/06/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  20. CX-007779: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Maintenance CX(s) Applied: B1.3 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  1. CX-006694: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Repetitive/Routine Maintenance ActivitiesCX(s) Applied: B1.3Date: 07/13/2011Location(s): Casper, WyomingOffice(s): RMOTC

  2. Categorical Exclusion Determinations: Arizona | Department of...

    Office of Environmental Management (EM)

    Efficiency enhancement in c-Si solar cells by introducing ... Oracle-Saguaro 115 Kilovolt Transmission Line Routine Maintenance ... Offices(s): Western Area Power Administration-Desert ...

  3. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    Canyon 230-kV Transmission Line Routine Maintenance of ... of Proposal: Western Area Power Administration (Western) ... replacement of high-efficiency particulate air ...

  4. Categorical Exclusion Determinations: Legacy Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Five Locations on the San Juan River Floodplain near Shiprock, New Mexico, Disposal Site. ... Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions CX(s) ...

  5. Categorical ExclusIon Determination Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB .5 - Cooling water system...

  6. CX-009646: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    646: Categorical Exclusion Determination CX-009646: Categorical Exclusion Determination Maintenance Activities CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B5.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office The proposed actions comprise maintenance support services frequently and routinely requested for operational support of DOE facilities and properties. PDF icon CX-009646.pdf More Documents & Publications CX-000324: Categorical

  7. Categorical Exclusion Determination Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 Cooling water system...

  8. Categorical Exclusion Determination Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  9. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  10. U.S. Department of Energy Categorical Exclusion Determination...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    proposed actions comprise maintenance support services frequently and routinely requested for ... regulations E. planned burns for ecosystem enhancements F. wildlife management ...

  11. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  12. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  13. CX-009691: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Washington River Protection Solutions LLC - Routine Maintenance CX(s) Applied: B1.3 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  14. CX-009226: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    CH2MHill Plateau Remediation Company - Routine Maintenance and Custodial Services CX(s) Applied: B1.3 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  15. CX-003623: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Grounds and Maintenance ActivitiesCX(s) Applied: B1.3, B1.11, B1.15Date: 08/24/2010Location(s): IllinoisOffice(s): Science, Argonne Site Office

  16. CX-011235: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Inspection and Treatment - Routine Transmission Line Maintenance CX(s) Applied: B1.3 Date: 10/24/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-007442: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Maintenance Activities at the Grand Junction, Colorado, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Colorado Offices(s): Legacy Management

  18. CX-009411: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration

  19. CX-000001: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Access Road Maintenance to the Rockdale Microwave SiteCX(s) Applied: B1.3Date: 10/07/2009Location(s): King County, WashingtonOffice(s): Bonneville Power Administration

  20. CX-005883: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance, and Administrative Actions at the Salmon, Mississippi SiteCX(s) Applied: A8, A9, A11, B3.1Date: 05/05/2011Location(s): Salmon, MississippiOffice(s): Legacy Management

  1. CX-000281: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Idaho Cleanup Project Routine MaintenanceCX(s) Applied: B1.3Date: 11/10/2009Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy

  2. CX-008814: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance Operations on Existing Facilities at Brookhaven National Laboratory CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): New York Offices(s): Brookhaven Site Office

  3. CX-007439: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Maintenance Activities at the George West, Texas, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Texas Offices(s): Legacy Management

  4. CX-006595: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Monitoring and Maintenance, Sherwood, Washington, Disposal SiteCX(s) Applied: B1.3, B1.11, B3.1Date: 08/29/2011Location(s): Sherwood, WashingtonOffice(s): Legacy Management

  5. CX-013838: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory Routine Maintenance Activities (Overarching) CX(s) Applied: B1.3Date: 06/01/2015 Location(s): IdahoOffices(s): Nuclear Energy

  6. CX-006091: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance ServicesCX(s) Applied: B1.3Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office

  7. CX-011635: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Administrative, Maintenance, and Operating Activities at Pantex Plant for 2014 and2015 CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Texas Offices(s): Pantex Site Office

  8. CX-013772: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Oracle-Saguaro 115 Kilovolt Transmission Line Routine Maintenance Project CX(s) Applied: B1.3Date: 05/04/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  9. CX-012328: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    PNNL Projects Involving Routine Maintenance in the 300 Area CX(s) Applied: B1.3 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  10. CX-013663: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Site-Wide Categorical Exclusion: Routine Maintenance CX(s) Applied: B3.1Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office

  11. CX-006594: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring and Maintenance, Lowman, Idaho, Disposal SiteCX(s) Applied: B1.3Date: 08/30/2011Location(s): Lowman, IdahoOffice(s): Legacy Management

  12. CX-008175: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance and Administrative at the Durango, Colorado Disposal and Former Processing Sites CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): Colorado Offices(s): Legacy Management

  13. CX-010439: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  14. CX-006823: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance Actions at the Calibration Pads and Borehole Pits Near Grants, New MexicoCX(s) Applied: B1.3Date: 10/13/2011Location(s): Grants, New MexicoOffice(s): Legacy Management

  15. CX-013778: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Site-Wide Routine Maintenance Activities, 2015 Update CX(s) Applied: B1.3Date: 03/31/2015 Location(s): New YorkOffices(s): West Valley Demonstration Project

  16. CRAD, NNSA- Maintenance (MN)

    Office of Energy Efficiency and Renewable Energy (EERE)

    CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  17. CRAD, Maintenance Assessment Plan

    Broader source: Energy.gov [DOE]

    An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations.

  18. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  19. Routine Radiological Environmental Monitoring Plan. Volume 1

    SciTech Connect (OSTI)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  20. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  1. CX-005886: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance, General Site Actions, and Non-Routine Actions at the Edgemont, South Dakota Disposal SiteCX(s) Applied: B1.3, B1.11, B1.24Date: 05/17/2011Location(s): Edgemont, South DakotaOffice(s): Legacy Management

  2. CX-006832: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Monitoring, Maintenance, General Site Actions, Non-Routine Actions, and Administrative Actions at the Cannonsburg, Pennsylvania, Disposal SiteCX(s) Applied: B1.3, B3.1Date: 09/15/2011Location(s): Cannonsburg, PennsylvaniaOffice(s): Legacy Management

  3. CX-006824: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Monitoring, Maintenance, General Site Actions, Non-Routine Actions, and Administrative Actions at the Parkersburg, West Virginia, Disposal SiteCX(s) Applied: B1.3, B3.1Date: 09/15/2011Location(s): Parkersburg, West VirginiaOffice(s): Legacy Management, Golden Field Office

  4. CX-006833: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Monitoring, Maintenance, General Site Actions, Non-Routine Actions, and Administrative Actions at the Burrell, Pennsylvania, Disposal SiteCX(s) Applied: B1.3, B3.1Date: 09/15/2011Location(s): Burrell, PennsylvaniaOffice(s): Legacy Management, Golden Field Office

  5. Step 5: Operations and Maintenance

    Energy Savers [EERE]

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  6. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

     

    We would like to inform the OpenEI community that OpenEI will be...

  7. Determination

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Determination of a Minimum Soiling Level to Affect Photovoltaic Devices Patrick D. Burton and Bruce H. King Sandia National Laboratories, Albuquerque, NM 87185 USA...

  8. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  9. Operations and Maintenance Best Practices Guide | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best ...

  10. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday,...

  11. CX-008764: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Routine Monitoring, Maintenance, General Site, and Administrative Actions at the L-Bar, New Mexico, Disposal Site CX(s) Applied: B1.3, B3.1 Date: 05212012 Location(s): New Mexico ...

  12. CategorIcal Exclusion Determination Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 Cooling water system...

  13. ~l Categorical Exclusion DetermInation Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  14. Categorical Exclusion DetermInation Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  15. Categorical Exclusion Determination 1"orn1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation OB1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB I.S - Cooling water system...

  16. Categorical ExcluSIon Determination Forn1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation I8lB 1.3 * Routine maintenance and custodial services DB 1,4 * Air conditioning installation for existing equipment DB 1.5 Cooling water system...

  17. Categorical ExclusIon Determination Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation IRIB 1.3 Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  18. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  19. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  20. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  1. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  2. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Office of Environmental Management (EM)

    Kayenta-Navajo 230-kV Transmission Line Access Road Maintenance Coconino and Navajo Counties, Arizona A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to conduct routine road maintenance on its existing access roads along the Kayenta-Navajo 230-kV Transmission Line. The approximate 31.7 miles of road maintenance would occur intermittently along a 50-mile segment of the line from Strncture 41/3, approximately 13 miles west of Shonto, Arizona, to Strncture

  3. Web Maintenance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Requirements Web Maintenance Requirements The Office of Energy Efficiency and Renewable Energy (EERE) expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance. Websites that are no longer being maintained should be archived. Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web Coordinators should ensure these tasks

  4. ARM - Field Campaign - Evaluation of Routine Atmospheric Sounding...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Campaign Links ERASMUS Backgrounder News & Press Images Comments? We would love to hear from...

  5. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  6. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  7. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  8. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  9. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  10. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  11. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  12. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  13. Categorical ExclusIon DetermInation Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation gB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB I.S - Cooling water system...

  14. Categorical ExclusIon DetermInation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation 8B 1.3 * Routine maintenance and custodial services DB 1.4 * Air conditioning installation for existing equipment DB I.S - Cooling water system...

  15. Categorical ExclusIon DetermInation Fom1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  16. Categorical ExclusIon DetermInatIon Fornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation I8B 1.3 . Routine maintenance and custodial services DB 1.4 Air conditioning installation for existing equipment DB 1.5 * Cooling water system...

  17. CX-009088: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-009664: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mission Support Alliance Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B CX(s) Applied: B1.3 Date: 12/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  19. CX-003090: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line CorridorCX(s) Applied: B1.3Date: 06/15/2010Location(s): Klickitat County, WashingtonOffice(s): Bonneville Power Administration

  20. CX-009408: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration

  1. CX-004880: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance Along TRY-CC 10/4-11/1CX(s) Applied: B1.3, B1.13Date: 06/01/2010Location(s): Contra Costa County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region

  2. CX-004879: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance Along Captain Jack-Olinda (CPJ-ODA) 259, 260, 261, 262, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, and 291CX(s) Applied: B1.3, B1.13Date: 05/20/2010Location(s): CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region

  3. CX-011608: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mission Support Alliance Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, B1.3 for Calendar Year 2014 CX(s) Applied: B1.3 Date: 12/02/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  4. CX-002763: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Maintenance Along TRY-CC 10/4-11/1CX(s) Applied: B1.13, B1.3Date: 06/01/2010Location(s): Conta Costra County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region

  5. CX-005682: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance, Research, General Site, and Administrative Actions at the Shiprock, New Mexico, Disposal SiteCX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1Date: 04/14/2011Location(s): Shiprock, New MexicoOffice(s): Legacy Management

  6. CX-005885: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Monitoring, Maintenance, Geoprobe Well Installation, and Administrative Actions at the Ambrosia Lake, New Mexico, Disposal SiteCX(s) Applied: B1.3, B3.1Date: 05/17/2011Location(s): Ambrosia Lake, New MexicoOffice(s): Legacy Management

  7. CX-002671: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Vegetation Management - Routine Maintenance Along Captain Jack-Olinda Transmission LineCX(s) Applied: B1.13, B1.3Date: 05/20/2010Location(s): CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region

  8. CX-012754: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Curecanti-Lost Canyon II 230 Kilovolt Routine Maintenance of Access Roads Montrose and San Miguel Counties, Colorado CX(s) Applied: B1.3Date: 41837 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-012763: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hesperus-Montrose 345 Kilovolt Transmission Line Routine Maintenance of ROW Roads Ouray, Montrose, and San Miguel Counties, Colorado CX(s) Applied: B1.3Date: 41869 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-009099: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office

  11. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance Self-Assessment Schedule for the FFTF. In January 1997, the Secretary of Energy declared that DOE-HQ planned to place the FFTF in a hot standby condition.

  12. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  13. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Unmanned Aerial Systems (UAS) Evaluation of Routine Atmospheric Sounding

    Office of Scientific and Technical Information (OSTI)

    Measurements using Unmanned Systems (ERASMUS) (Dataset) | Data Explorer Data Explorer Search Results Unmanned Aerial Systems (UAS) Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Title: Unmanned Aerial Systems (UAS) Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Data were collected to improve understanding of the Arctic troposphere, and to provide researchers with a focused case-study period for future

  15. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned

    Office of Scientific and Technical Information (OSTI)

    Systems (ERASMUS) Science Plan (Program Document) | SciTech Connect Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan Citation Details In-Document Search Title: Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan The use of unmanned aerial systems (UAS) is becoming increasingly popular for a variety of applications. One way in which these systems can provide revolutionary scientific

  16. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  17. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  18. Emergency diesel generator: Maintenance and failure unavailability, and their risk impacts

    SciTech Connect (OSTI)

    Samanta, P.; Kim, I.; Uryasev, S.; Penoyar, J.; Vesely, W.

    1994-11-01

    Emergency Diesel Generators (EDGs) provide on-site emergency alternating current (ac) electric power for a nuclear plant in the event that all off-site power sources are lost. Existing regulations establish requirements for designing and testing of these on-site power sources to reduce to an acceptable level the probability of losing all ac power sources. Operating experience with EDGs has raised questions about their testing and maintenance to achieve the EDG reliability levels and the total EDG unavailability experienced (fraction of time EDG is out-of-service due to testing, maintenance, and failures). In this report, recent operating experience is used to assess EDG unavailability due to testing, maintenance, and failures during reactor power operation and during plant shutdown. Recent data show an improvement in EDG reliability, but an increase in EDG unavailability due to maintenance, a significant portion of which is due to routinely scheduled maintenances. Probabilistic safety assessments (PSAs) of selected nuclear power plants are used to assess the risk impact of EDG unavailability due to maintenance and failure during power operation, and during different stages of plant shutdown. The results of these risk analyses suggest qualitative insights for scheduling EDG maintenance that will have minimal impact on risk of operating nuclear power plants.

  19. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  20. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  1. EZVIDEO, FORTRAN graphics routines for the IBM AT

    SciTech Connect (OSTI)

    Patterson, M.R.; Holdeman, J.T.; Ward, R.C.; Jackson, W.L.

    1989-10-01

    A set of IBM PC-based FORTRAN plotting routines called EZVIDEO is described in this report. These routines are written in FORTRAN and can be called from FORTRAN programs. EZVIDEO simulates a subset of the well-known DISSPLA graphics calls and makes plots directly on the IBM AT display screen. Screen dumps can also be made to an attached LaserJet or Epson printer to make hard copy without using terminal emulators. More than forty DISSPLA calls are simulated by the EZVIDEO routines. Typical screen plots require about 10 seconds (s), and good hard copy of the screen image on a laser printer requires less than 2 minutes (min). This higher-resolution hard copy is adequate for most purposes because of the enhanced resolution of the screen in the EGA and VGA modes. These EZVIDEO routines give the IB, AT user a stand-alone capability to make useful scientific or engineering plots directly on the AT, using data generated in FORTRAN programs. The routines will also work on the IBM PC or XT in CGA mode, but they require more time and yield less resolution. 7 refs., 4 figs.

  2. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  3. Preventive Maintenance Strategies for Compressed Air Systems

    Broader source: Energy.gov [DOE]

    This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

  4. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  7. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  20. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  1. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford.gov will be undergoing scheduled upgrades and will be unavailable from 7:00 am Saturday, April 16th, 2016 until 5:00pm Sunday, April 17th, 2016. All Hanford.gov websites and web applications will be unavailable during this upgrade. Questions and inquiries regarding this maintenance outage please

  2. Evaluation of urban storm-water maintenance in North Carolina

    SciTech Connect (OSTI)

    Roenigk, D.J.; Paterson, R.G.; Heraty, M.A.; Kaiser, E.J.; Burby, R.J.

    1992-06-01

    Spurred by continuing urban growth and new federal mandates for control of nonpoint source pollution, local governments are increasingly concerned about the need to improve stormwater management. Long-term maintenance is a critical aspect of stormwater management if both water quality and water quantity benefits are to be realized in practice. The report examines what is actually being done in North Carolina cities to maintain stormwater systems and what selected stormwater experts feel should be done. Several actions are needed. First, local governments are recommended to pay greater attention to system planning, apply more stringent design standards, and monitor the effectiveness of structures protecting water quality as the most critical basis for successful long-term maintenance. Second, policy makers at all levels of government and researchers need to determine appropriate strategies for the treatment and disposal of accumulated sediments. Finally, further research about the best maintenance practices and financing arrangements may be needed.

  3. Standard hydrogen monitoring system - E operation and maintenance manual

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-06-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

  4. Categorical ExclusIon DetermInatIon J-iornl

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB 1.5 - Cooling water system...

  5. Cryogenic Neutron Protein Crystallography: routine methods and potential benefits

    SciTech Connect (OSTI)

    Weiss, Kevin L; Tomanicek, Stephen J; NG, Joseph D

    2014-01-01

    The use of cryocooling in neutron diffraction has been hampered by several technical challenges such as the need for specialized equipment and techniques. Recently we have developed and deployed equipment and strategies that allow for routine neutron data collection on cryocooled crystals using off the shelf components. This system has several advantages, compared to a closed displex cooling system such as fast cooling coupled with easier crystal mounting and centering. The ability to routinely collect cryogenic neutron data for analysis will significantly broaden the range of scientific questions that can be examined by neutron protein crystallography. Cryogenic neutron data collection for macromolecules has recently become available at the new Biological Diffractometer BIODIFF at FRM II and the Macromolecular Diffractometer (MaNDi) at the Spallation Neutron Source, Oak Ridge National Laboratory. To evaluate the benefits of a cryocooled neutron structure we collected a full neutron data set on the BIODIFF instrument on a Toho-1 lactamase structure at 100K.

  6. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  7. Evaluation of Routine Atmospheric Sounding Measurements Using Unmanned Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Routine Atmospheric Sounding Measurements Using Unmanned Systems but also to understand the different processes involved in a cloud's life cycle by providing measurements complimentary to those concurrently obtained by instruments stationed at the third ARM Mobile Facility (AMF3) at Oliktok Point. ERASMUS will supply data to address the following science questions: * How does temperature and humidity evolve during transitions between clear and cloudy skies? * How do aerosol properties vary with

  8. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  9. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  10. FAQS Reference Guide – Facility Maintenance Management

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  11. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  12. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  13. Routine environmental audit of Ames Laboratory, Ames, Iowa

    SciTech Connect (OSTI)

    1994-09-01

    This document contains the findings identified during the routine environmental audit of Ames Laboratory, Ames, Iowa, conducted September 12--23, 1994. The audit included a review of all Ames Laboratory operations and facilities supporting DOE-sponsored activities. The audit`s objective is to advise the Secretary of Energy, through the Assistant Secretary for Environment, Safety and Health, as to the adequacy of the environmental protection programs established at Ames Laboratory to ensure the protection of the environment, and compliance with Federal, state, and DOE requirements.

  14. Surveillance & Maintenance: The Requirements Based Surveillance and

    Energy Savers [EERE]

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  15. CX-005846: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-005846: Categorical Exclusion Determination Wood Pole Replacement and Minor Access Road Maintenance Along Various Transmission Line Rights-Of-Way in the Wenatchee District CX(s) ...

  16. CX-009199: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-009199: Categorical Exclusion Determination Access Road Improvement For the ... Bonneville Power Administration proposes to perform access road maintenance on several ...

  17. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  18. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  19. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  20. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  1. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based Surveillance and Maintenance Review Process Interview Form More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  2. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance PDF icon ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE

  3. U.S. Department of Energy Categorical Exclusion Determination Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Routine replacement of High Efficiency Particulate Air (HEPA) Filters Carlsbad Field Office Carlsbad, Eddy County, New Mexico Removal of High Efficiency Particulate Air (HEPA) filters designated as low-level waste resulting from air filtration of waste handling operations and mining operations at the WIPP facility, for off-site treatment and disposal at a private facility authorized to manage that waste. B1.3 - Routine maintenance 09/11/2012 Susan E. McCauslin Digitally signed by Susan E.

  4. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  5. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  6. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  7. SEP Request for Approval Form 6 - Non-Routine Adjustments | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 - Non-Routine Adjustments SEP Request for Approval Form 6 - Non-Routine Adjustments File SEP-Request-for-Approval-Form-6_Non-Routine-Adjustments.docx More Documents & Publications Superior Energy Performance Enrollment and Application Forms SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 4 - Alternative Adjustment Model Application Methodology

  8. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  9. Facility Maintenance Management Functional Area Qualification...

    Office of Environmental Management (EM)

    ... DOE O 433.1B and in accordance with DOE O 226.1B. B. Review submitted NMMP description ... facility maintenance management. 1. DOE O 226.1B, Implementation of Department of Energy ...

  10. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-typ...

  11. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  12. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  13. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  14. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  15. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  16. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Website Maintenance Process and Template Website Maintenance Process and Template Below you can read more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team meetings to report on their website maintenance plans for the rest of the fiscal year. Fill out the Web maintenance template before attending this meeting and email it to the WGT facilitator. File Website maintenance process Microsoft

  17. Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance

  18. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED

    Office of Scientific and Technical Information (OSTI)

    PRESSURE RELIEF VALVES (Conference) | SciTech Connect Conference: THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES Citation Details In-Document Search Title: THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and

  19. The Effects of Maintenance Actions on the PFDavg of Spring Operated

    Office of Scientific and Technical Information (OSTI)

    Pressure Relief Valves (Journal Article) | SciTech Connect Journal Article: The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves Citation Details In-Document Search This content will become publicly available on December 1, 2016 Title: The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of

  20. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  1. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Computerized Maintenance Management System 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs ...

  2. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Identify tasks that may be performed by operations maintenance personnel. 7. Analyze ... 1999 Maintainability and Maintenance Management By: Joseph D. Patton, Jr. Published ...

  3. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step 1: Strive to increase management awareness and appreciation of the operations and maintenance programdepartment. * Consider developing a maintenance mission statement and ...

  4. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Systems Project Profile: Innovative Application of Maintenance-Free Phase-Change Thermal ...

  5. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  6. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Color Maintenance of LEDs in Laboratory and Field Applications Citation Details In-Document Search Title: Color Maintenance of LEDs in Laboratory and Field Applications Synopsis: ...

  7. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  8. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  9. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area ... EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western ...

  10. FY 2014 Real Property Data Related to Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY2014DataRelatedtoOperati...

  11. Innovative Application of Maintenance-Free Phase-Change Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Engine Solar Power Generation Innovative Application of Maintenance-Free Phase-Change Thermal Energy ...

  12. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  13. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a...

  14. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Locally, Prestige Maintenance also provides grounds maintenance at Ft. Eustis and at Langley Air Force Base. Jefferson Science Associates, LLC, a joint venture of the Southeastern ...

  15. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and ...

  16. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  17. Long-Term Surveillance and Maintenance Program 2003 Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report PDF icon Long-Term Surveillance and ...

  18. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  19. An improved system for routine performance testing in fossil plants

    SciTech Connect (OSTI)

    Wolff, P.J.; Hansen, D.B.; March, P.A.

    1996-05-01

    A data acquisition and analysis system has been developed that reduces the time and labor required to perform routine performance tests on power plant components. The system uses modem data acquisition and computation technologies to integrate the process of data acquisition, data analysis, and reporting of results. During a test run, the data acquisition system reads the data and transfers it to a Microsoft Excel workbook via a dynamic data exchange (DDE) link. In Excel, the system computes and displays real-time trend plots. Real-time plots typically include a display of precision errors, thus providing an immediate indication of the quality of the current test. Upon completion of a run, the system saves results and creates plots in a workbook dedicated to test results. The plots can display computed values such as turbine or boiler feedpump efficiency. Benchmark data can also be included in the plots to provide immediate feedback concerning the change in the performance of a component and the dollar cost due to the performance change. The data tables and plots provide a preliminary report that is available immediately upon completion of the test.

  20. Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance

    SciTech Connect (OSTI)

    Bond, Leonard J.

    2011-02-01

    For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

  1. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  2. Categorical Exclusion Determinations: B1.32 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aberdeen Substation (Grays Harbor PUD) Tree Clearing CX(s) Applied: B1.32 Date: 06242015 ... Routine Maintenance Activities CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, ...

  3. Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder

  4. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  5. Director of Maintenance for USA Jet Airlines, Inc. | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Director of Maintenance for USA Jet Airlines, Inc. Rick A. Wilson Rick Wilson July 2009 U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year Rick A. Wilson has received the U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year award. Wilson is the director of maintenance for USA Jet Airlines, Inc., in Albuquerque. He manages the maintenance activity of seven different fleet aircraft for the Office

  6. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  7. OPS 9.2 Shift Routines and Operating Practices 8/24/98 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OPS 9.2 Shift Routines and Operating Practices 82498 The objective of this surveillance is to verify that standards for the professional conduct of operations personnel are ...

  8. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  9. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  10. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  11. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  12. Categorical Exclusion Determinations: B1.28 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... June 2, 2011 CX-006033: Categorical Exclusion Determination Monitoring, Maintenance, Environmental and Biological Sampling, and Administrative Actions on Amchitka and Adak Islands, ...

  13. Methods for synchronizing a countdown routine of a timer key and electronic device

    DOE Patents [OSTI]

    Condit, Reston A.; Daniels, Michael A.; Clemens, Gregory P.; Tomberlin, Eric S.; Johnson, Joel A.

    2015-06-02

    A timer key relating to monitoring a countdown time of a countdown routine of an electronic device is disclosed. The timer key comprises a processor configured to respond to a countdown time associated with operation of the electronic device, a display operably coupled with the processor, and a housing configured to house at least the processor. The housing has an associated structure configured to engage with the electronic device to share the countdown time between the electronic device and the timer key. The processor is configured to begin a countdown routine based at least in part on the countdown time, wherein the countdown routine is at least substantially synchronized with a countdown routine of the electronic device when the timer key is removed from the electronic device. A system and method for synchronizing countdown routines of a timer key and an electronic device are also disclosed.

  14. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  15. CB-EMIS MAINTENANCE MONITORING SYSTEM

    Energy Science and Technology Software Center (OSTI)

    2006-10-01

    This system continuously monitors all components of a CB-EMIS (ANL-02-078)installation such as signals for video cameras, detector, train data, meteorological data, computer and network equipment and reports exceptions to maintenance staff so that corrections can be made as soon as possible. This monitoring system is built within Nagios (www.nagios.org), a free open source host service and network monitoring program.

  16. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  17. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  18. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  19. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  20. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  1. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year ... PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End ...

  2. Operations and Maintenance in Federal Facilities | Department of Energy

    Energy Savers [EERE]

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-type pump, works properly over the long term. Federal facilities rely on pumps, motors, fans, and other mechanical systems

  3. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  4. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  5. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  6. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  7. CX-010658: Categorical Exclusion Determination | Department of...

    Office of Environmental Management (EM)

    CX-010658: Categorical Exclusion Determination Analytical Development Laser Maintenance CX(s) Applied: B3.6 Date: 06172013 Location(s): South Carolina Offices(s): Savannah River ...

  8. CX-006627: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-006627: Categorical Exclusion Determination Elverta Maintenance Facility Remodel CX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5 Date: 08242011 Location(s): Sacramento County, ...

  9. Categorical Exclusion Determinations: New Mexico | Department...

    Office of Environmental Management (EM)

    ... July 1, 2014 CX-012357: Categorical Exclusion Determination Shiprock Substation Stormwater Erosion Control Maintenance, San Juan County, New Mexico CX(s) Applied: B1.33 Date: 07...

  10. Categorical Exclusion Determinations: Montana | Department of...

    Energy Savers [EERE]

    March 11, 2015 CX-013448: Categorical Exclusion Determination Taft Substation Retaining Wall and Stormwater Maintenance Project CX(s) Applied: B1.3 Date: 03112015 Location(s): ...

  11. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  12. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  13. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  14. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    King, David A

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

  15. Operations and Maintenance Savings from Advanced Metering Infrastructure - Initial Results

    Energy Savers [EERE]

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital

  16. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintaining Your Air Conditioner Maintaining Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary

  17. DOE-STD-1181-2004; Facility Maintenance Management Functional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... maintenance management personnel shall demonstrate a working level knowledge of industrial property management practices as related to stores, spare parts, and essential materials. ...

  18. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in an efficient manner and that operations and maintenance personnel are well trained. ... or system (lumens per watt) Energy management system - A microprocessor-based system ...

  19. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  20. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: LED, ssl, solid-state, lighting, GATEWAY, CALiPER, report, color, shift, maintenance Word Cloud More Like This Full ...

  1. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  2. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    Community Wind HandbookPlan for Maintenance < Community Wind Handbook Jump to: navigation, search WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHCommunity Wind Handbook...

  3. Operations and Maintenance Best Practices--A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide is designed to serve as a source for O&M management and technical staff. It ... OPERATION; EFFICIENCY; MAINTENANCE; MANAGEMENT; RECOMMENDATIONS Word Cloud More Like ...

  4. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  5. Moment-Based Probability Modeling and Extreme Response Estimation, The FITS Routine Version 1.2

    SciTech Connect (OSTI)

    MANUEL,LANCE; KASHEF,TINA; WINTERSTEIN,STEVEN R.

    1999-11-01

    This report documents the use of the FITS routine, which provides automated fits of various analytical, commonly used probability models from input data. It is intended to complement the previously distributed FITTING routine documented in RMS Report 14 (Winterstein et al., 1994), which implements relatively complex four-moment distribution models whose parameters are fit with numerical optimization routines. Although these four-moment fits can be quite useful and faithful to the observed data, their complexity can make them difficult to automate within standard fitting algorithms. In contrast, FITS provides more robust (lower moment) fits of simpler, more conventional distribution forms. For each database of interest, the routine estimates the distribution of annual maximum response based on the data values and the duration, T, over which they were recorded. To focus on the upper tails of interest, the user can also supply an arbitrary lower-bound threshold, {chi}{sub low}, above which a shifted distribution model--exponential or Weibull--is fit.

  6. Categorical Excluslon DeterminatIon 11'orn1 Project Title: Bear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DeterminatIon 11'orn1 ...... Project Title: Bear Creek Road Deferred Maintenance Reduction Project (4550) Program or Program Office: Y-12 Site Office Oak Ridge Tennessee Project...

  7. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  8. NREL Programmatic NEPA Determinations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic NEPA Determinations NREL Programmatic NEPA Determinations The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy has developed five Programmatic NEPA Determinations (PND) to address routine activities and ongoing research conducted at National Renewable Energy Laboratory (NREL) facilities. These determinations were conducted as part of a joint DOE and NREL NEPA Enhancement Project that was developed to help streamline the NEPA process for activities

  9. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  10. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  11. Aging management of fossil-fired plants of Electricite de France: PVP maintenance aspects

    SciTech Connect (OSTI)

    Thoraval, G.

    1995-12-01

    The generation mix of EDF comprises 17,000 MW of fossil-fired units, the ages of which go from 10 to 32 years. Extensive studies have been launched in 1994, inside the Company, to determine: (1) prospects of needs of the grid (domestic/exports); (2) prospects of possible competition in generation field; (3) environmental aspects and possible evolution; (4) adaptation of management of men and organizations; and (5) management of condition of equipment through maintenance policy. This paper focuses on the last item, spotted on pressure vessels and piping. The question is: How to conserve the ``patrimony`` for very long term, with lowest costs to keep it competitive in its very specific role? Several items are examined: (1) the background, the different programs of retrofitting, refurbishment and life extension; (2) conservation during outages, and mothballing procedures and experience; (3) design review, actual design life expectancy; (4) analysis of aging mechanisms through experience feedback; (5) determination of critical components, analysis of their condition, periodical updating; (6) maintenance adaptation, extensive condition-monitored maintenance approach: use of existing probes and data, development of new devices and skills; (7) policy of progressive replacement of worn-out and potentially dangerous components; examples concerning generic problems; (8) management of requirements of pressure vessels regulations; (9) adaptation of spare parts policy; and (10) research and development needed by life management.

  12. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan G de Boer B Argrow G Bland J Elston D Lawrence J Maslanik S Palo M Tschudi December 2015 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of

  13. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    this guide is to provide you, the Operations and Maintenance (O&M)Energy manager and practitioner, with useful information about O&M management, technologies, energy and water ...

  14. National Geothermal Data System Architecture Design, Testing and Maintenance

    Broader source: Energy.gov [DOE]

    Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

  15. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities Putting in place O&M reporting requirements. The goal is to minimize disagreements ...

  16. John William (Bill) Ebert Jr. ? Longtime Y-12 Maintenance Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    John William (Bill) Ebert Jr. - Longtime Y-12 Maintenance Manager I knew him as "Mr. Ebert" when his office was in Building 9734. I used to park my bicycle in the hallway just...

  17. TNRC 61 - General Provisions Use and Maintenance of Public Beaches...

    Open Energy Info (EERE)

    1 - General Provisions Use and Maintenance of Public Beaches Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: TNRC 61 - General...

  18. Gas characterization system operation, maintenance, and calibration plan

    SciTech Connect (OSTI)

    Tate, D.D.

    1996-03-04

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

  19. Site Transition Framework for Long-Term Surveillance and Maintenance

    Broader source: Energy.gov [DOE]

    The Site Transition Framework (STF) provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTS&...

  20. Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

    Energy Savers [EERE]

    Sites | Department of Energy Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). Source document citations are presented. Most of these sites meet criteria for unrestricted use; a

  1. Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Citation Details In-Document Search Title: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Advanced designs of used nuclear fuel recycling processes and radioactive waste treatment processes are expected to include more ambitious goals for aqueous based separations including; higher separations efficiency, high-level waste minimization, and

  2. Y-12 demos former utilities and maintenance facility | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration demos former utilities and maintenance facility Friday, September 26, 2014 - 1:05pm The Y-12 National Security Complex recently completed another improvement in its site infrastructure with the demolition of Building 9744, a former utilities and maintenance facility occupying more than 9,000 square feet. Despite structural issues and waste disposal concerns, the facility was safely demolished nearly two months ahead of schedule. The demolition proved challenging due

  3. Requirements-Based Surveillance and Maintenance Review Guide | Department

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National Bridge Inventory Record Data Submission Requirement of Energy

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to

  4. Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  5. Estimated maintenance cost savings from a geothermal heat pump energy savings performance contract at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-12-31

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all the equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  6. Steam trap maintenance management saves $180,000 annually

    SciTech Connect (OSTI)

    Franks, F.C.; Wickersham, C.

    1985-12-01

    The Reichhold Chemical plant is located in Elizabeth, NJ. At this location, the cost of steam had skyrocketed to $5.30 per million Btu. The plant has 600 steam traps manufactured by ten different companies. Some 17 different models of traps are used with 33 piping configurations. There are five different operating pressures throughout the plant ranging from 15-175 psig, including 30, 65, and 120 psig. Five different applications of steam usage can be broken down as follows: steam tracing (56%); drip (21%); comfort heating (18%); tank coil (4%); and process (1%). In the fall of 1983, the annual yearly inspection of steam traps was supplanted with an independent trap survey service, specializing in detecting the malfunctioning of various types of steam traps. The basic program included location and tagging of all steam traps; survey and inspection of steam trap population; development of a trap map; and full computer analysis of collected data. It was determined that approximately 3919 lb/hr of steam could be saved by repairing the failed open traps and implementing the report's recommendations. There were also benefits from fixing the failed closed traps which were out of service at the time of the survey. These traps do not allow the flow of steam or condensate to pass through the orifice. This condition causes condensate to back up and reduce efficiency. The maintenance management has been pleased with the results and recommendations of the program. It has provided them with a complete inventory and status report of the 600 traps plantwide. It saved $180,000 over the previous year in energy expenditures. This was the most important contribution in lowering the plant energy costs.

  7. Application of Standard Maintenance Windows in PHWR Outage

    SciTech Connect (OSTI)

    Fuming Jiang [Third Qinshan Nuclear Power Company, Ltd. (China)

    2006-07-01

    The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

  8. Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electric Vehicles Maintenance and Safety of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Twitter Bookmark Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Google Bookmark Alternative Fuels Data Center: Maintenance

  9. FEMP Offers New Training on Photovoltaic Operations and Maintenance Best

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Practices | Department of Energy New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm Addthis The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) will present O&M Best Practices for Small Scale PV Systems, a live First Thursday Seminar on December 4, 2014, from 1:30 p.m. to 3 p.m. This new First Thursday Seminar will feature a new

  10. Text-Alternative Version: Maintenance Practices for LED Streetlights |

    Energy Savers [EERE]

    Department of Energy Maintenance Practices for LED Streetlights Text-Alternative Version: Maintenance Practices for LED Streetlights Bruce Kinzey:So again, I want to welcome everyone to another MSSLC webinar. And we have a great one lined up today. At this point everyone is familiar with the fact that the solid-state street lighting is being installed by the thousands, hundreds of thousands in fact, around the country. I think everyone's also pretty familiar with the kinds of energy savings

  11. Using condition monitoring for maintenance, control of hydro plants

    SciTech Connect (OSTI)

    Brown, N.; Varo, R.; Morras, F.A.

    1994-12-31

    Electric utilities are actively seeking ways of optimizing the economics of their operations by improving productivity and reducing time and money spent on maintenance. Iberdrola, a Spanish utility, is using advanced machine condition-monitoring technology to centralize control and maintenance of its hydropower projects as a means of achieving those goals. The company is using a blend of technologies to supervise their projects from a regional control center. The monitoring scheme makes use of data from on-line, machine-condition monitors, displays from in-plant audio asnd video equipment, and analysis from the control center`s SCADA system.

  12. Categorical Exclusion Determinations: A1

    Broader source: Energy.gov [DOE]

    A1: Routine DOE business actionsRoutine actions necessary to support the normal conduct of DOE business limited to administrative, financial, and personnel actions.

  13. Theoretical description of methodology in PHASER (Probabilistic hybrid analytical system evaluation routine)

    SciTech Connect (OSTI)

    Cooper, J.A.

    1996-01-01

    Probabilistic safety analyses (PSAs) frequently depend on fault tree and event tree models, using probabilities of `events` for inputs. Uncertainty or variability is sometimes included by assuming that the input probabilities vary independently and according to an assumed stochastic probability distribution modes. Evidence is accumulating that this methodology does not apply well to some situations, most significantly when the inputs contain a degree of subjectivity or are dependent. This report documents the current status of an investigation into methods for effectively incorporating subjectivity and dependence in PSAs and into the possibility of incorporating inputs that are partly subjective and partly stochastic. One important byproduct of this investigation was a computer routine that combines conventional PSA techniques with newly developed subjective techniques in a `hybrid` (subjective and conventional PSA) program. This program (PHASER) and a user`s manual are now available for beta use.

  14. Politics of schism: routinization and social control in the International Socialists/Socialist Workers' Party

    SciTech Connect (OSTI)

    Rayner, S.

    1985-01-01

    The received wisdom of social science holds that voluntary organizations founded on egalitarian principles, can only survive by undergoing transformation into hierarchical systems. The underlying logic of Weber, Michels and Toennies' descriptions is that social organizations sustain themselves over time by generating increasingly complex systems of rules that become sources of inequality. This article argues that routinization in voluntary groups does not consist of a gradual accumulation of rules that promote internal inequality. Instead, two analytically distinct steps are proposed: (1) construction of a distinctive organizational boundary, which is a necessary condition for (2) the ultimate imposition of a complex organizational hierarchy. The case used to illustrate this argument is drawn from the history of the British Trotskyist movement prior to 1978. The argument itself is framed within a formal model of the sociology of knowledge called grid/group analysis.

  15. Low-level waste vitrification contact maintenance viability study

    SciTech Connect (OSTI)

    Leach, C.E., Westinghouse Hanford

    1996-07-12

    This study investigates the economic viability of contact maintenance in the Low-Level Waste Vitrification Facility, which is part of the Hanford Site Tank Waste Remediation System. This document was prepared by Flour Daniel, Inc., and transmitted to Westinghouse Hanford Company in September 1995.

  16. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  17. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  18. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  19. Orifice-type condensate removal device reduces maintenance, energy costs

    SciTech Connect (OSTI)

    Wright, T.N.; Isaacs, M.

    1983-02-01

    In the acrylate section of the Rohm and Haas Texas plant in Deer Park, conventional steam traps were replaced by a potential orifice-type condensate removal device that has no moving parts or gaskets. Each of the devices installed resulted in a saving of an estimated $2000/year by eliminating the maintenance required on the original steam traps.

  20. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  1. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  2. CX-012817: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bell Maintenance Headquarters Access Road Maintenance CX(s) Applied: B1.3Date: 41890 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. Westinghouse Hanford Job Control System: Integration of preventive maintenance systems into a job control system

    SciTech Connect (OSTI)

    Hayenga, J.L.; Longwell, T.C.

    1989-10-01

    The goal of a maintenance program is to assure equipment is available to function as required. To meet this goal corrective maintenance (CM) and preventive maintenance (PM) programs are essential, and both should be considered when evaluating a maintenance program. Work control is the tool used to effectively control CM and PM. We will consider reasons that Corrective and Preventive Maintenance programs should be integrated. How the 200 Area Preventive Maintenance program is being integrated into the Job Control System (JCS), and problems posed by an operation like Hanford which is large scale in terms of geography, number of components and number of independently run plants.

  4. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  5. Routine environment audit of the Kansas City Plant, Kansas City, Missouri

    SciTech Connect (OSTI)

    1994-11-01

    This report documents the results of the routine environmental audit of the Kansas City Plant, Kansas City, Missouri. During this audit the activities the audit team conducted included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE) and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted October 24-November 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of the Department`s environmental programs within line organizations and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  6. Routine environmental audit of the Sandia National Laboratories, California, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This report documents the results of the Routine Environmental Audit of the Sandia National Laboratories, Livermore, California (SNL/CA). During this audit the activities the Audit Team conducted included reviews of internal documents and reports from preview audits and assessments; interviews with US Department of Energy (DOE), State of California regulators, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from February 22 through March 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements. The audit`s functional scope was comprehensive and included all areas of environmental management and a programmatic evaluation of NEPA and inactive waste sites.

  7. Post-Deactivation Surveillance and Maintenance Planning | Department of

    Energy Savers [EERE]

    Post Secondary Project Performance Benchmarks Post Secondary Project Performance Benchmarks Reports five major performance metrics that can be used to benchmark proposed energy service company projects within post secondary education facilities, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy PDF icon Post Secondary Project Performance Benchmarks More Documents & Publications K-12 Schools Energy

    Post-Deactivation Surveillance and Maintenance

  8. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their

  9. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their

  10. Article Published on LED Lumen Maintenance and Light Loss Factors

    Broader source: Energy.gov [DOE]

    An article has been published in LEUKOS: The Journal of the Illuminating Engineering Society of North America (IES) that may be of interest to the solid-state lighting community. Entitled "Lumen Maintenance and Light Loss Factors: Consequences of Current Design Practices for LEDs," the article was written by Michael Royer of Pacific Northwest National Laboratory and discusses complications related to the lamp lumen depreciation (LLD) light loss factor and LEDs.

  11. Project Profile: Maintenance-Free Stirling Engine for High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling ...

  12. OpenEI maintenance March 8-9, 2013 | OpenEI Community

    Open Energy Info (EERE)

    OpenEI maintenance March 8-9, 2013 Home > Groups > Utility Rate Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 developer Maintenance OpenEI We would...

  13. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 - ...

  14. Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of...

    Office of Environmental Management (EM)

    Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A ...

  15. Maintenance Guide for DOE Low-Level Waste Disposal Facility | Department of

    Energy Savers [EERE]

    Energy Maintenance Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses PDF icon Maintenance Guide for DOE Low-Level Waste Disposal Facility More Documents & Publications Format and Content Guide for DOE Low-Level Waste Disposal Facility Format and Content Guide for DOE Low-Level Waste Disposal Facility

  16. FY 2014 Real Property Data Related to Operations and Maintenance Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY_2014_Data_Related_to_Operations_and_Maintenance_Memorandum.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and

  17. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection, LLC | Department of Energy Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for

  18. SU-E-P-05: Is Routine Treatment Planning System Quality Assurance Necessary?

    SciTech Connect (OSTI)

    Alaei, P

    2014-06-01

    Purpose: To evaluate the variation of dose calculations using a treatment planning system (TPS) over a two year period and assessment of the need for TPS QA on regular intervals. Methods: Two phantoms containing solid water and lung- and bone-equivalent heterogeneities were constructed in two different institutions for the same brand treatment planning system. Multiple plans, consisting of photons and electron beams, including IMRT and VMAT ones, were created and calculated on the phantoms. The accuracy of dose computation in the phantoms was evaluated at the onset by dose measurements within the phantoms. The dose values at up to 24 points of interest (POI) within the solid water, lung, and bone slabs, as well as mean doses to several regions of interest (ROI), were re-calculated over a two-year period which included two software upgrades. The variations in POI and ROI dose values were analyzed and evaluated. Results: The computed doses vary slightly month-over-month. There are noticeable variations at the times of software upgrade, if the upgrade involves remodeling and/or re-commissioning of the beams. The variations are larger in certain points within the phantom, usually in the buildup region or near interfaces, and are almost non-existent for electron beams. Conclusion: Routine TPS QA is recommended by AAPM and other professional societies, and is often required by accreditation organizations. The frequency and type of QA, though, is subject to debate. The results presented here demonstrate that the frequency of these tests could be at longer intervals than monthly. However, it is essential to perform TPS QA at the time of commissioning and after each software upgrade.

  19. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  20. Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc

    Energy Savers [EERE]

    May 26, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti, Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage

  1. Subject: Ames Blue Alert - X-ray Shutter Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Blue Alert - X-ray Shutter Maintenance Statement: This lesson learned involves an Ames Laboratory x-ray system. Prior to starting x- ray experiments checking the operability of safety interlocks and x-ray shutter systems will decrease the likelihood of an unplanned exposure incident. Discussion: At the end of a sample run the shutter for an x-ray system at the Ames Laboratory did not close automatically as expected. The researcher followed the approved safety procedures and did not access

  2. Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance

    Office of Legacy Management (LM)

    RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory

  3. Solicitation - Geothermal Drilling Development and Well Maintenance Projects

    SciTech Connect (OSTI)

    Sattler, A.R.

    1999-07-07

    Energy (DOE)-industry research and development (R and D) organization, sponsors near-term technology development projects for reducing geothermal drilling and well maintenance costs. Sandia National Laboratories (Albuquerque, NM) administers DOE funds for GDO cost-shared projects and provides technical support. The GDO serves a very important function in fostering geothermal development. It encourages commercialization of emerging, cost-reducing drilling technologies, while fostering a spirit of cooperation among various segments of the geothermal industry. For Sandia, the GDO also serves as a means of identifying the geothermal industry's drilling fuel/or well maintenance problems, and provides an important forum for technology transfer. Successfully completed GDO projects include: the development of a high-temperature borehole televiewer, high-temperature rotating head rubbers, a retrievable whipstock, and a high-temperature/high-pressure valve-changing tool. Ongoing GDO projects include technology for stemming lost circulation; foam cement integrity log interpretation, insulated drill pipe, percussive mud hammers for geothermal drilling, a high-temperature/ high-pressure valve changing tool assembly (adding a milling capability), deformed casing remediation, high- temperature steering tools, diagnostic instrumentation for casing in geothermal wells, and elastomeric casing protectors.

  4. RFEDSCHK User's Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1. 00

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

  5. CX-006946: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    627: Categorical Exclusion Determination CX-006627: Categorical Exclusion Determination Elverta Maintenance Facility Remodel CX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5 Date: 08/24/2011 Location(s): Sacramento County, California Office(s): Western Area Power Administration-Sierra Nevada Region The Elverta Maintenance Facility remodeling project will include an expanded parking garage and workshop facility and also include the following site improvements; (I) mezzanine for storage; (2) two

  6. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  7. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs.

  8. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  9. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  10. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  11. Maintenance is the cheapest way to improve fine coal dewatering

    SciTech Connect (OSTI)

    Burger, J.

    1986-01-01

    There are a great many things that a preparation plant operator can do right now to increase fine coal dewatering effectiveness and maintenance is one of them, says Donald A. Dahlstrom, at the University of Utah. Dewatering of fine coal is increasingly important, because electricity generation, the largest coal consumer, is so strongly affected by the moisture content. Every pound of water put into a boiler raises costs about 2 1/2 cents. The heat it takes to turn water to steam and get it out the stack is heat that could have been used to generate power. In addition, there is the cost of shipping the water. You can add the freight costs to that. In contrast it costs about 1/2-cent/lb to remove the water at the preparation plant.

  12. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    SciTech Connect (OSTI)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team indicates that the proposed solutions to the investigated operating cycle length barriers are both feasible and consistent with sound design practice.

  13. Inertial Fusion Power Plant Concept of Operations and Maintenance

    SciTech Connect (OSTI)

    Anklam, T.; Knutson, B.; Dunne, A. M.; Kasper, J.; Sheehan, T.; Lang, D.; Roberts, V.; Mau, D.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  14. DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED

    Energy Savers [EERE]

    PAR38 Lamps | Department of Energy Lumen and Chromaticity Maintenance of LED PAR38 Lamps DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED PAR38 Lamps February 11, 2015 - 2:54pm Addthis The U.S. Department of Energy's CALiPER program has released Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity maintenance, and catastrophic failure in 32 of the Series 20 LED PAR38 lamps and eight

  15. Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU)

    Broader source: Energy.gov [DOE]

    Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU) presentation at the April 2013 peer review meeting held in Denver, Colorado.

  16. 01-05-2006 - X-Ray Shutter Maintenance | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 - X-Ray Shutter Maintenance Document Number: NA Effective Date: 01/2006 File (public): PDF icon 01-05-2006

  17. NEPA Determination: LM-12a-12

    Broader source: Energy.gov [DOE]

    Additional Considerations Amendment to LM #12-12, Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site 

  18. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  19. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

  20. Routine production of copper-64 using 11.7MeV protons

    SciTech Connect (OSTI)

    Jeffery, C. M.; Smith, S. V.; Asad, A. H.; Chan, S.; Price, R. I.

    2012-12-19

    Reliable production of copper-64 ({sup 64}Cu) was achieved by irradiating enriched nickel-64 ({sup 64}Ni, >94.8%) in an IBA 18/9 cyclotron. Nickel-64 (19.1 {+-} 3.0 mg) was electroplated onto an Au disc (125{mu}m Multiplication-Sign 15mm). Targets were irradiated with 11.7 MeV protons for 2 hours at 40{mu}A. Copper isotopes ({sup 60,61,62,64}Cu) were separated from target nickel and cobalt isotopes ({sup 55,57,61}Co) using a single ion exchange column, eluted with varying concentration of low HCl alcohol solutions. The {sup 64}Ni target material was recovered and reused. The {sup 64}Cu production rate was 1.46{+-}0.3MBq/{mu}A.hr/mg{sup 64}Ni(n = 10) (with a maximum of 2.6GBq of {sup 64}Cu isolated after 2hr irradiation at 40uA. Radionuclidic purity of the {sup 64}Cu was 98.7 {+-} 1.6 % at end of separation. Cu content was < 6mg/L (n = 21). The specific activity of {sup 64}Cu was determined by ICP-MS and by titration with Diamsar to be 28.9{+-}13.0GBq/{mu}mol[0.70{+-}0.35Ci/{mu}mol]/({mu}A.hr/mg{sup 64}Ni)(n = 10) and 13.1{+-}12.0GBq/{mu}mol[0.35{+-}0.32Ci/{mu}mol]/({mu}A.hr/mg{sup 64}Ni)(n 9), respectively; which are in agreement, however, further work is required.

  1. Effects Influencing Plutonium-Absorber Interactions and Distributions in Routine and Upset Waste Treatment Plant Operations

    SciTech Connect (OSTI)

    Delegard, Calvin H.; Sinkov, Sergey I.; Fiskum, Sandra K.

    2015-05-01

    This report is the third in a series of analyses written in support of a plan to revise the Hanford Waste Treatment and Immobilization Plant (WTP) Preliminary Criticality Safety Evaluation Report (CSER) that is being implemented at the request of the U.S. Department of Energy (DOE) Criticality Safety Group. A report on the chemical disposition of plutonium in Hanford tank wastes was prepared as Phase 1 of this plan (Delegard and Jones 2015). Phase 2 is the provision of a chemistry report to describe the potential impacts on criticality safety of waste processing operations within the WTP (Freer 2014). In accordance with the request from the Environmental and Nuclear Safety Department of the WTP (Miles and Losey 2012), the Phase 2 report assessed the potential for WTP process conditions within and outside the range of normal control parameters to change the ratio of fissile material to neutron-absorbing material in the waste as it is processed with an eye towards potential implications for criticality safety. The Phase 2 study also considered the implications should WTP processes take place within the credible range of chemistry upset conditions. In the present Phase 3 report, the 28 phenomena described in the Phase 2 report were considered with respect to the disposition of plutonium and various absorber elements. The phenomena identified in the Phase 2 report are evaluated in light of the Phase 1 report and other resources to determine the impacts these phenomena might have to alter the plutonium/absorber dispositions and ratios. The outcomes of the Phase 3 evaluations then can be used to inform subsequent engineering decisions and provide reasonable paths forward to mitigate or overcome real or potential criticality concern in plant operations.

  2. Development of a one-stop beam verification system using electronic portal imaging devices for routine quality assurance

    SciTech Connect (OSTI)

    Lim, Sangwook; Ma, Sun Young; Jeung, Tae Sig; Yi, Byong Yong; Lee, Sang Hoon; Lee, Suk; Cho, Sam Ju; Choi, Jinho

    2012-10-01

    In this study, a computer-based system for routine quality assurance (QA) of a linear accelerator (linac) was developed by using the dosimetric properties of an amorphous silicon electronic portal imaging device (EPID). An acrylic template phantom was designed such that it could be placed on the EPID and be aligned with the light field of the collimator. After irradiation, portal images obtained from the EPID were transferred in DICOM format to a computer and analyzed using a program we developed. The symmetry, flatness, field size, and congruence of the light and radiation fields of the photon beams from the linac were verified simultaneously. To validate the QA system, the ion chamber and film (X-Omat V2; Kodak, New York, NY) measurements were compared with the EPID measurements obtained in this study. The EPID measurements agreed with the film measurements. Parameters for beams with energies of 6 MV and 15 MV were obtained daily for 1 month using this system. It was found that our QA tool using EPID could substitute for the film test, which is a time-consuming method for routine QA assessment.

  3. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  4. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    2004-07-01

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  5. Site transition framework for long-term surveillance and maintenance

    SciTech Connect (OSTI)

    2014-04-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

  6. On-line maintenance methodology development and its applications

    SciTech Connect (OSTI)

    Kim, J.; Jae, M.

    2012-07-01

    With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

  7. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  8. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  9. CX-010315: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    717: Categorical Exclusion Determination CX-009717: Categorical Exclusion Determination Pumping System for 100 MBD Cavern Capacity Maintenance CX(s) Applied: B1.15 Date: 12/12/2012 Location(s): Texas, Louisiana, Texas Offices(s): Strategic Petroleum Reserve Field Office Subcontractor shall provide all labor, tools, materials, equipment, services, transportation, storage and supervision required to install new Variable Frequency Drive (VFD) buildings at the Big Hill (BH), Bryan Mound (BM), and

  10. Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End

    Energy Savers [EERE]

    Summary Report | Department of Energy 3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020 Strategic Plan (DOE 2011). PDF icon Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report More Documents & Publications Long-Term Surveillance Operations and Maintenance Fiscal Year

  11. Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End

    Energy Savers [EERE]

    Summary Report | Department of Energy 4 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End Summary Report The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). LM needs knowledge and tools to ensure that implementation of LTS&M will be informed, efficient, and cost-effective.

  12. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    SciTech Connect (OSTI)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  13. The role of ice nuclei recycling in the maintenance of cloud ice in Arctic

    Office of Scientific and Technical Information (OSTI)

    mixed-phase stratocumulus (Journal Article) | SciTech Connect The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus Citation Details In-Document Search Title: The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus This study investigates the maintenance of cloud ice production in Arctic mixed phase stratocumulus in large-eddy simulations that include a prognostic ice nuclei (IN) formulation and a

  14. The role of ice nuclei recycling in the maintenance of cloud ice in Arctic

    Office of Scientific and Technical Information (OSTI)

    mixed-phase stratocumulus (Journal Article) | SciTech Connect The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus Citation Details In-Document Search Title: The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus This study investigates the maintenance of cloud ice production in Arctic mixed-phase stratocumulus in large eddy simulations that include a prognostic ice nuclei (IN) formulation and a

  15. Meeting with Greg Horton

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    remodeling, renovations, Maintenance and Janitorial Services * ISU manages the CAES Facility. ISU Maintenance staff will provide routine maintenance and janitorial...

  16. Portable Special Function Routines

    Energy Science and Technology Software Center (OSTI)

    1992-02-27

    SPECFUN is a collection of transportable FORTRAN subroutines and accompanying test drivers to evaluate certain special functions.

  17. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  18. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-12

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Cancels DOE G 433.1-1.

  19. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-09

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Admin Chg 1, dated 6-14-13, supersedes DOE G 433.1-1A.

  20. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES

    Broader source: Energy.gov [DOE]

    "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This...

  1. CALiPER Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance...

    Energy Savers [EERE]

    Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions December 2014 Prepared for: Solid-State Lighting Program Building ...

  2. The role of ice nuclei recycling in the maintenance of cloud...

    Office of Scientific and Technical Information (OSTI)

    The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus Citation Details In-Document Search Title: The role of ice nuclei recycling in ...

  3. VP of Transmission System Asset Management for Desert Southwest Region (Maintenance Manager)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Maintenance (G5000) 615 S. 43rd Avenue Phoenix, AZ 85009...

  4. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  5. Operation and maintenance manual for the LDUA operations control trailer (LDUA System 4100)

    SciTech Connect (OSTI)

    Clark, D.A.

    1996-09-10

    The Light Duty Utility Arm (LDUA) Operations Control Trailer(OCT) has completed testing and is ready for operation. This document defines the requirements applicable to the operation and maintenance of the OCT.

  6. Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8

    Broader source: Energy.gov [DOE]

    The Energy Department's Office of Indian Energy, Tribal Energy Program, and Western Area Power Administration will present the next Tribal Renewable Energy Series webinar, Project Implementation and Operations & Maintenance, on Friday, Aug. 8, 2014, from 11:00 a.m. to 12:30 p.m. Mountain time. The webinar will focus on the last two steps of a five-step tribal energy project development framework: Project Implementation and Operations and Maintenance (O&M).

  7. Risk-Informed LNG/CNG Maintenance Facility Codes and Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NO. 2011-XXXXP Risk-Informed LNG/CNG Maintenance Facility Codes and Standards Project sponsored by the Clean Vehicle Education Foundation Chris LaFleur, Myra Blaylock, Rad Bozinoski, Amanda Dodd, Ethan Hecht, Doug Horne, Alice Muña Sandia National Laboratories SAND NO. 2015-7361PE Project Motivation  Improve codes and standards for gaseous fuel vehicle maintenance facility design and operation to reflect technology advancements  Develop Risk-Informed guidelines for modification and

  8. ETO family protein Mtgr1 mediates Prdm14 functions in stem cell maintenance

    Office of Scientific and Technical Information (OSTI)

    and primordial germ cell formation (Journal Article) | SciTech Connect ETO family protein Mtgr1 mediates Prdm14 functions in stem cell maintenance and primordial germ cell formation Citation Details In-Document Search Title: ETO family protein Mtgr1 mediates Prdm14 functions in stem cell maintenance and primordial germ cell formation Authors: Nady, Nataliya ; Gupta, Ankit ; Ma, Ziyang ; Swigut, Tomek ; Koide, Akiko ; Koide, Shohei ; Wysocka, Joanna [1] ; UC) [2] + Show Author Affiliations

  9. Fossil plant maintenance optimization at FPC`s Crystal River Units 4 & 5

    SciTech Connect (OSTI)

    Cossey, J.; Pflasterer, R.; Colsher, R.; Toomey, G.; Smith, S.; Abbott, P.

    1996-07-01

    Florida Power Corporation recently completed a Fossil Plant Maintenance Optimization project at it`s Crystal River Units 4 and 5 coal fired power plant. The project combined Streamlined Reliability Centered Maintenance (SRCM) techniques with a Predictive Maintenance (PDM) Assessment to analyze eleven of the plants systems that represent the principal contributors to maintenance costs. The plant had an extensive existing maintenance program that included several types of condition monitoring. The Benefit-to-Cost analysis indicates that the annual savings associated with the project recommendations result in a payback period of less than one year. This paper summarizes the types of recommendations that were made and describes the processes used for both the SRCM analysis and the PDM Assessment. The SRCM analysis used proven techniques and software that have been used on other projects, including some sponsored by EPRI. The PDM Assessment process was similar to processes used previously for EPRI and non- EPRI utilities; however, this was the first project where the two processes were modified to take advantage of work performed using the other. All of the recommendations developed by the SRCM analysts were reviewed by the PDM analysts before they were finalized. The structure and flow of the project is also described including how the SRCM and PDM analysts interfaced with the plant staff and how implementation was facilitated. The analysis relied on plant experience related to the operation and maintenance history of the equipment. The recommendations for each system were reviewed by a team consisting of the first-line maintenance supervisors, the maintenance planners, and the plant technical services group. The project recommendations are essentially two-thirds implemented, with many of them implemented before the analysis was completed.

  10. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tools | Department of Energy RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 - 12:19pm Addthis The Advanced Manufacturing Office (AMO) would like to understand the market opportunities for enhancing and expanding certain industrial system software tools and related assets (including training curriculum and written technical resources). Currently, these tools and

  11. Results of the plant maintenance optimization (PMO) pilot-project at an ENEL Fossil Power Plant

    SciTech Connect (OSTI)

    Falco, F. de; Paratore, A.; Moscotti, L.

    1996-07-01

    ENEL S.p.A. operates about sixty fossil power plants in Italy for a total installed power of more than 37,000 MW. This paper describes the pilot-project to apply Reliability Centered Maintenance (RCM) methodology at the {open_quotes}La Casella{close_quotes} Fossil Power Plant (4 x 320 MW units, oil fired). The project was performed by an ENEL working group (Generation and R&D Divisions) with assistance from ERIN, Engineering and Research, Inc. The first phase of the project confirmed the application and validity of the streamlined RCM method called Plant Maintenance Optimization (PMO) on the Condensate and Feedwater Systems. The second phase evaluated the effectiveness of the PMO method as used to developed an optimized maintenance program for five systems - Vent & Drain and Chemical Reagents, Boiler Start-Up, Boiler Auxiliaries, Blowing Compressors, and Air & Flue Gas. The conclusions of the project are consistent with other successful streamlined RCM applications (1) The PMO method is valid and applicable to fossil power plants; (2) Streamlined RCM approaches allow significant reduction in the time spent to perform an RCM analysis, without sacrificing the quality of the results; (3) PMO is effective in defining an optimized maintenance program; (4) The maintenance program developed through the analysis can be easily updated when the criticality criteria and/or maintenance history change.

  12. CleanFleet. Final report: Volume 3, vehicle maintenance and durability

    SciTech Connect (OSTI)

    1995-12-01

    CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

  13. CX-011177: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  14. CX-012641: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mossy Rock-Chehalis #1 Access Road Maintenance CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration

  15. CX-012647: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kalispell District 2014 Transmission Line Maintenance - Multiple Lines CX(s) Applied: B1.3Date: 41862 Location(s): MontanaOffices(s): Bonneville Power Administration

  16. CX-013796: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chehalis District Access Road Maintenance CX(s) Applied: B4.6Date: 06/15/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  17. CX-001000: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Maintenance ProjectsCX(s) Applied: B1.3Date: 02/20/2010Location(s): Salmon, MississippiOffice(s): Legacy Management

  18. CX-012640: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lexington-Longview #1 Access Road Maintenance CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration

  19. CX-013423: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kalispell Maintenance Headquarters Upgrades CX(s) Applied: B1.3Date: 01/28/2015 Location(s): MontanaOffices(s): Bonneville Power Administration

  20. CX-007793: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Jonesboro Maintenance Facility Additions CX(s) Applied: B1.15 Date: 05/10/2011 Location(s): Arkansas Offices(s): Southwestern Power Administration

  1. CX-007798: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Springfield Maintenance Garage CX(s) Applied: B1.15 Date: 12/08/2010 Location(s): Missouri Offices(s): Southwestern Power Administration

  2. CX-012812: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chemawa-Salem #1 & #2 Access Road Maintenance CX(s) Applied: B1.3Date: 41893 Location(s): OregonOffices(s): Bonneville Power Administration

  3. CX-013782: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Washougal Vegetative Maintenance - LURR 20150160 CX(s) Applied: B4.9Date: 07/08/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  4. CX-012645: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wenatchee District 2014 Transmission Line Maintenance - Multiple Lines CX(s) Applied: B1.3Date: 41862 Location(s): WashingtonOffices(s): Bonneville Power Administration

  5. CX-009203: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  6. The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Solomon, A.; Feingold, G.; Shupe, M. D.

    2015-09-25

    This study investigates the maintenance of cloud ice production in Arctic mixed-phase stratocumulus in large eddy simulations that include a prognostic ice nuclei (IN) formulation and a diurnal cycle. Balances derived from a mixed-layer model and phase analyses are used to provide insight into buffering mechanisms that maintain ice in these cloud systems. We find that, for the case under investigation, IN recycling through subcloud sublimation considerably prolongs ice production over a multi-day integration. This effective source of IN to the cloud dominates over mixing sources from above or below the cloud-driven mixed layer. Competing feedbacks between dynamical mixing andmore » recycling are found to slow the rate of ice lost from the mixed layer when a diurnal cycle is simulated. The results of this study have important implications for maintaining phase partitioning of cloud ice and liquid that determine the radiative forcing of Arctic mixed-phase clouds.« less

  7. The role of ice nuclei recycling in the maintenance of cloud ice in Arctic mixed-phase stratocumulus

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Solomon, A.; Feingold, G.; Shupe, M. D.

    2015-04-21

    This study investigates the maintenance of cloud ice production in Arctic mixed phase stratocumulus in large-eddy simulations that include a prognostic ice nuclei (IN) formulation and a diurnal cycle. Balances derived from a mixed-layer model and phase analyses are used to provide insight into buffering mechanisms that maintain ice in these cloud systems. We find that for the case under investigation, IN recycling through subcloud sublimation considerably prolongs ice production over a multi-day integration. This effective source of IN to the cloud dominates over mixing sources from above or below the cloud-driven mixed layer. Competing feedbacks between dynamical mixing andmore » recycling are found to slow the rate of ice lost from the mixed layer when a diurnal cycle is simulated. The results of this study have important implications for maintaining phase partitioning of cloud ice and liquid that determine the radiative forcing of Arctic mixed-phase clouds.« less

  8. CX-013777: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    777: Categorical Exclusion Determination CX-013777: Categorical Exclusion Determination Re-route SMARTDITCH and Channel Storm Water and Low Level Wastewater Discharges CX(s) Applied: B1.26 Date: 04/20/2015 Location(s): New York Offices(s): West Valley Demonstration Project Since installation of the Smart Ditch® in 2010, routine inspections have determined that there is significant surface erosion at the northeast corner of Lagoon 3. Storm water discharges at outfall S-09 are causing progressive

  9. Categorical Exclusion (CX) Determinations By CX | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX Categorical Exclusion (CX) Determinations By CX A. - Categorical Exclusions Applicable to General Agency Actions A1 - Routine DOE business actions A2 - Clarifying or administrative contract actions A3 - Certain actions by Office of Hearings and Appeals A4 - Interpretations and rulings for existing regulations A5 - Interpretive rulemakings with no change in environmental effect A6 - Procedural rulemakings A7 - [Reserved] A8 - Awards of certain contracts A9 - Information gathering, analysis,

  10. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect (OSTI)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  11. Categorical Exclusion Determinations: B1.31 | Department of Energy

    Energy Savers [EERE]

    1 Categorical Exclusion Determinations: B1.31 Existing Regulations B1.31: Installation or relocation of machinery and equipment Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include

  12. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  13. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    SciTech Connect (OSTI)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  14. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J.

    1997-12-31

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  15. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  16. Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance

    Energy Savers [EERE]

    113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console

  17. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  18. MAS 10.1 Implementation of the Integrated Safety Management System (ISMS) Process in Maintenance Activities, 2/14/2000

    Broader source: Energy.gov [DOE]

    The objective of this surveillance is to evaluate the effectiveness of the contractor's ISMS process with regard to maintenance activities.  Surveillance activities encompass work planning and...

  19. Pacific Northwest National Laboratory Grounds Maintenance: Best Management Practice Case Studies #4 and #5 - Water Efficient Landscape and Irrigation (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-08-01

    FEMP Water Efficiency Best Management Practices #4 and #5 Case Study: Overview of the Pacific Northwest National Laboratory grounds maintenance program and results.

  20. Application of Crunch-Flow Routines to Constrain Present and Past Carbon Fluxes at Gas-Hydrate Bearing Sites

    SciTech Connect (OSTI)

    Torres, Marta

    2014-01-31

    In November 2012, Oregon State University initiated the project entitled: Application of Crunch-Flow routines to constrain present and past carbon fluxes at gas-hydrate bearing sites. Within this project we developed Crunch-Flow based modeling modules that include important biogeochemical processes that need to be considered in gas hydrate environments. Our modules were applied to quantify carbon cycling in present and past systems, using data collected during several DOE-supported drilling expeditions, which include the Cascadia margin in US, Ulleung Basin in South Korea, and several sites drilled offshore India on the Bay of Bengal and Andaman Sea. Specifically, we completed modeling efforts that: 1) Reproduce the compositional and isotopic profiles observed at the eight drilled sites in the Ulleung Basin that constrain and contrast the carbon cycling pathways at chimney (high methane flux) and non-chimney sites (low methane, advective systems); 2) Simulate the Ba record in the sediments to quantify the past dynamics of methane flux in the southern Hydrate Ridge, Cascadia margin; and 3) Provide quantitative estimates of the thickness of individual mass transport deposits (MTDs), time elapsed after the MTD event, rate of sulfate reduction in the MTD, and time required to reach a new steady state at several sites drilled in the Krishna-Godavari (K-G) Basin off India. In addition we developed a hybrid model scheme by coupling a home-made MATLAB code with CrunchFlow to address the methane transport and chloride enrichment at the Ulleung Basins chimney sites, and contributed the modeling component to a study focusing on pore-scale controls on gas hydrate distribution in sediments from the Andaman Sea. These efforts resulted in two manuscripts currently under review, and contributed the modeling component of another pare, also under review. Lessons learned from these efforts are the basis of a mini-workshop to be held at Oregon State University (Feb 2014) to instruct graduate students (OSU and UW) as well as DOE staff from the NETL lab in Albany on the use of Crunch Flow for geochemical applications.

  1. CX-007437: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Site Activities at the Shoal, Nevada, Site CX(s) Applied: B1.3, B3.1 Date: 12/13/2011 Location(s): Nevada Offices(s): Legacy Management

  2. CX-007821: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management

  3. CX-007754: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Site Activities at the Rulison, Colorado, Site CX(s) Applied: B3.1 Date: 12/22/2011 Location(s): Colorado Offices(s): Legacy Management

  4. CX-012590: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Samples from the ARP/MCU System CX(s) Applied: B3.6Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  5. CX-008173: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Site Activities at the Rio Blanco, Colorado Site CX(s) Applied: B1.3, B3.1 Date: 05/02/2012 Location(s): Colorado Offices(s): Legacy Management

  6. CX-007438: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Activities at the Casper, Wyoming, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Wyoming Offices(s): Legacy Management

  7. CX-007822: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Activities at the Laboratory for Energy-Related Health Research (LEHR), California, Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): California Offices(s): Legacy Management

  8. CX-007441: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Actions at the Central Nevada Test Area CX(s) Applied: B1.3, B3.1 Date: 12/14/2011 Location(s): Nevada Offices(s): Legacy Management

  9. CX-008174: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Activities Associated with the Gasbuggy Site in Northern New Mexico CX(s) Applied: B1.3, B3.1 Date: 04/13/2012 Location(s): New Mexico Offices(s): Legacy Management

  10. CX-007755: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine and Proposed Actions at the Riverton, Wyoming, Processing Site CX(s) Applied: B1.3, B3.1 Date: 01/12/2012 Location(s): Wyoming Offices(s): Legacy Management

  11. CX-009248: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Replacement of High Efficiency Particulate Air Filters CX(s) Applied: B1.3 Date: 09/11/2012 Location(s): New Mexico Offices(s): Waste Isolation Pilot Plant

  12. CX-006092: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Routine Custodial ServicesCX(s) Applied: B1.3Date: 06/21/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office

  13. CX-007753: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Routine Activities at the Piqua, Ohio, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 01/18/2012 Location(s): Ohio Offices(s): Legacy Management

  14. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY2006

    SciTech Connect (OSTI)

    B. E. Olaveson

    2006-10-02

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document.

  15. The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants

    SciTech Connect (OSTI)

    Wreathall, J.; Fragola, J.; Appignani, P.; Burlile, G.; Shen, Y. )

    1990-05-01

    This report summarizes the development and evaluation of programmatic performance indicators of maintenance. These indicators were selected by: (1) creating a formal framework of plant processes; (2) identifying features of plant behavior considered important to safety; (3) evaluating existing indicators against these features; and (4) performing statistical analyses for the selected indicators. The report recommends additional testing. 32 refs., 29 figs., 11 tabs.

  16. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    SciTech Connect (OSTI)

    2010-08-01

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  17. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  18. System maintenance test plan for the TWRS controlled baseline database system

    SciTech Connect (OSTI)

    Spencer, S.G.

    1998-09-23

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented.

  19. CRAD, Maintenance- Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility.

  20. Implementation Guide for Surveillance and Maintenance during Facility Transition and Disposition

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-29

    As DOE facilities complete mission operations and are declared excess, they pass into a transition phase that ultimately prepares them for disposition. The disposition phase of a facility's life cycle usually includes deactivation, decommissioning, and surveillance and maintenance (S&M) activities.

  1. RFEDSCHK User`s Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1.00

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG&G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

  2. CX-003085: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Boyer-Tillamook Number 1 Transmission Line Access Road MaintenanceCX(s) Applied: B1.3Date: 06/21/2010Location(s): Tillamook County, OregonOffice(s): Bonneville Power Administration

  3. CX-012750: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Canon West-Poncha 230 Kilovolt Transmission Line Road Maintenance Chaffee and Fremont Counties, Colorado CX(s) Applied: B1.3Date: 41878 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-004898: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gila-Wellton-Mohawk (Structure Maintenance)CX(s) Applied: B1.3Date: 11/05/2010Location(s): Yuma County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  5. CX-012814: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Minidoka Power House-Unity #1 Access Road Maintenance CX(s) Applied: B1.3Date: 41893 Location(s): IdahoOffices(s): Bonneville Power Administration

  6. CX-012039: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3-Dimensional Laser Imaging for Inspection, Maintenance, Repair, and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 04/11/2014 Location(s): Colorado Offices(s): National Energy Technology Laboratory

  7. CX-012040: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3-Dimensional Laser Imaging for Inspection, Maintenance, Repair, and Operations - Phase II CX(s) Applied: A9 Date: 04/11/2014 Location(s): Colorado Offices(s): National Energy Technology Laboratory

  8. CX-011852: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project CX(s) Applied: B1.3 Date: 01/21/2014 Location(s): California, California Offices(s): Western Area Power Administration-Desert Southwest Region

  9. CX-007995: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  10. CX-007994: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  11. CX-010250: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    The South Bend Public Transportation corporation Bus Operations Center and Maintenance Center, South Bend CX(s) Applied: A9, B5.22 Date: 03/25/2013 Location(s): Indiana Offices(s): Golden Field Office

  12. CX-012081: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kimball Substation KY1A Transformer Replacement and Road Maintenance CX(s) Applied: B1.3 Date: 02/10/2014 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-003964: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of Oceanography International Analytical SOLIDS Total Organic Compound (TOC) InstrumentCX(s) Applied: B3.6Date: 09/03/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

  14. CX-009528: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities CX(s) Applied: B1.3 Date: 08/02/2012 Location(s): New York Offices(s): West Valley Demonstration Project

  15. CX-004897: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Flagstaff-Glen Canyon (Access Road Maintenance)CX(s) Applied: B1.3Date: 10/01/2010Location(s): Coconino County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  16. CX-005434: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Consolidated Alternative Fuels/Transit Operations and Maintenance Training FacilityCX(s) Applied: A9Date: 02/09/2011Location(s): OklahomaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  17. CX-012735: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  18. CX-000474: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of 3-Mega Electron-Volt Van De Graaf AcceleratorCX(s) Applied: B3.10Date: 12/16/2009Location(s): IllinoisOffice(s): Science, Argonne Site Office

  19. CX-007461: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3-dimensional Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: B3.6 Date: 12/20/2011 Location(s): Colorado Offices(s): National Energy Technology Laboratory

  20. CX-007956: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3-Dimensional Laser Imaging for Inspection, Maintenance, Repair, and Operations CX(s) Applied: B3.6 Date: 01/30/2012 Location(s): California Offices(s): National Energy Technology Laboratory

  1. CX-011172: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Brasada-Harney Number 1 Access Road Maintenance Project CX(s) Applied: B1.3 Date: 09/18/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  2. CX-013603: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Western Sector Treatment System (WSTS) Maintenance Activities CX(s) Applied: B1.3Date: 03/09/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office

  3. CX-001638: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Maintenance Actions at the Monument Valley Arizona SiteCX(s) Applied: B1.3, B1.11Date: 04/08/2010Location(s): Monument Valley, ArizonaOffice(s): Legacy Management

  4. CX-010436: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  5. CX-013569: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Perform Hydrant Flushing, Maintenance, Prove Curb Valves, and Flow Test in C-Area CX(s) Applied: B1.3Date: 04/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  6. CX-012166: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Perform Hydrant Flushing, Maintenance, Prove Curb Valves, and Flow Test in C-Area CX(s) Applied: B1.3 Date: 04/23/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  7. CX-010890: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Sheep's Knob Communication Site Road Maintenance CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-011174: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

  9. CX-013654: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    BPA Idaho Falls District 2015 Wood Pole Replacement and Access Road Maintenance CX(s) Applied: B1.3Date: 04/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration

  10. CX-007155: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mead-Perkins Avian Nest Removal & Access Road MaintenanceCX(s) Applied: B1.3Date: 05/10/2010Location(s): Maricopa County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  11. CX-009205: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Rice Flats Electrode Site Maintenance and Inspection Project CX(s) Applied: B1.3 Date: 09/12/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  12. CX-007804: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Flagstaff-Pinnacle Peak #2 Conductor Maintenance CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  13. CX-013519: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shipping Containers 9975, 9977, and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6Date: 02/03/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  14. CX-004891: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Coolidge-Oracle (Structure Maintenance)CX(s) Applied: B1.3Date: 07/29/2010Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  15. CX-007133: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Casa Grande-Saguaro Structure MaintenanceCX(s) Applied: B1.3Date: 12/16/2010Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  16. CX-011206: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kayenta-Shiprock 230-Kilovolt Transmission Line Road Maintenance CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): Colorado, Colorado, New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-011205: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lost Canyon-Shiprock 230-Kilovolt Transmission Line Road Maintenance CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-012357: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shiprock Substation Stormwater Erosion Control Maintenance, San Juan County, New Mexico CX(s) Applied: B1.33 Date: 07/01/2014 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-008637: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  20. CX-012611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773-A, C150 CX(s) Applied: B3.6Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  1. CX-011334: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 09/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  2. CX-009331: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations Phase II CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): New Jersey Offices(s): National Energy Technology Laboratory

  3. CX-011860: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Magnetic Mountain Microwave Tower Access road Maintenance, Rio Blanco County, Colorado CX(s) Applied: B1.3 Date: 01/28/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-010728: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  5. CX-006296: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cardwell-Cowlitz 2011 Access Road MaintenanceCX(s) Applied: B1.3Date: 07/21/2011Location(s): Cowlitz County, WashingtonOffice(s): Bonneville Power Administration

  6. CX-013489: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167) CX(s) Applied: B1.3Date: 02/23/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office

  7. CX-006778: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Alvey Maintenance Headquarters Pole Storage Facility UpgradesCX(s) Applied: B4.6Date: 08/24/2011Location(s): Lane County, OregonOffice(s): Bonneville Power Administration

  8. CX-007168: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Rodgers-Cooolidge Structure MaintenanceCX(s) Applied: B1.3Date: 08/26/2011Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  9. CX-005542: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    CCW-Mid Transmission Line Access Road MaintenanceCX(s) Applied: B1.3Date: 03/24/2011Location(s): Fremont County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-010655: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  11. CX-000538: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Laser Spectroscopy - Setup, Maintenance, and Instrumentation DevelopmentCX(s) Applied: B3.6Date: 11/05/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

  12. CX-011856: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Substation Maintenance and Renovation Activities for 2014 CX(s) Applied: B1.3 Date: 01/23/2014 Location(s): Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region

  13. CX-012762: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Gore Pass-Kremmling 138 Kilovolt Transmission Line Maintenance Grand County, Colorado CX(s) Applied: B1.3Date: 41834 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-012768: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Poncha Substation Access and Drainage Maintenance Chaffee County, Colorado CX(s) Applied: B1.3Date: 41880 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-007142: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Electrical District 5 - Saguaro Structure MaintenanceCX(s) Applied: B1.3Date: 02/09/2011Location(s): Pinal County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  16. CX-007159: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Parker-Gila Structure MaintenanceCX(s) Applied: B1.3Date: 10/07/2010Location(s): La Paz and Yuma Counties, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  17. CX-009746: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Upstream Ultrasonic Processing for Small Producers: Preventative Maintenance for Paraffin Management CX(s) Applied: A9, A11, B3.6 Date: 12/17/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory

  18. CX-010116: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation, Maintenance, and End of Life of VG PlasmaQuad II ICPMS Units CX(s) Applied: B3.6 Date: 03/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  19. CX-012398: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Maintenance activity to clean/ unplug Outfall H-16 Diffuser at Upper Three Runs Creek (UTRC) CX(s) Applied: B1.3 Date: 05/01/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  20. CX-012368: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Custer-Ingledow Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  1. CX-003447: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bridge and Access Road MaintenanceCX(s) Applied: B1.3Date: 07/12/2010Location(s): Snohomish County, WashingtonOffice(s): Bonneville Power Administration

  2. CX-005543: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Casper-Arminto Vegetation Management Maintenance, Natrona County, WyomingCX(s) Applied: B1.3Date: 03/29/2011Location(s): Natrona County, WyomingOffice(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-008878: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-011375: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory Road Sign Installation/Maintenance CX(s) Applied: B1.32 Date: 09/27/2013 Location(s): Idaho Offices(s): Idaho Operations Office

  5. CX-001412: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Maintenance and Modification of Well Test Reactor Area (TRA)-08CX(s) Applied: B3.1, B1.3Date: 03/31/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy

  6. CX-011804: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Building 26 FSARS CX(s) Applied: B1.3, Facility operation and maintenance Date: 01/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory

  7. CX-010527: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Renovations and Maintenance Activities for Buildings, Structures CX(s) Applied: B1.3 Date: 06/03/2013 Location(s): Illinois Offices(s): Ames Site Office

  8. CX-011179: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  9. CX-006696: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Maintenance / Grading of Existing Roads and Road Drainages (Barrow Ditches)CX(s) Applied: B1.3Date: 08/06/2011Location(s): Casper, WyomingOffice(s): RMOTC

  10. CX-010167: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters CX(s) Applied: B1.19 Date: 03/21/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration

  11. CX-006575: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Fairview-Rogue Access Road Maintenance ProjectCX(s) Applied: B1.3Date: 08/22/2011Location(s): Coos County, OregonOffice(s): Bonneville Power Administration

  12. CX-007152: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Gila-Senator Wash Structure & Access Road MaintenanceCX(s) Applied: B1.3Date: 11/13/2009Location(s): Imperial County, CaliforniaOffice(s): Western Area Power Administration-Desert Southwest Region

  13. CX-012756: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Curecanti Substation Access and Drainage Maintenance, Montrose County, Colorado CX(s) Applied: B1.3Date: 41845 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-003232: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Ostrander-Troutdale Number 1 Access Road MaintenanceCX(s) Applied: B1.3Date: 07/30/2010Location(s): Clackamas County, OregonOffice(s): Bonneville Power Administration

  15. CX-006245: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    CCI-MP Transmission Line Access Road MaintenanceCX(s) Applied: B1.3Date: 07/06/2011Location(s): Montrose, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-012361: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hood River-Coop Service #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  17. CX-012366: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chehalis-Olympia #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  18. CX-012367: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Naselle-Tarlett #1 Access Road Maintenance CX(s) Applied: B1.3 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  19. CX-012360: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Cowlitz Tap Rebuild and Access Road Maintenance CX(s) Applied: B1.3, B1.24, B4.13 Date: 06/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  20. CX-011227: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Bi-Annual "Live Line" Maintenance Training CX(s) Applied: B1.2 Date: 10/08/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  1. CX-008913: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory

  2. CX-013448: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Taft Substation Retaining Wall and Stormwater Maintenance Project CX(s) Applied: B1.3Date: 03/11/2015 Location(s): MontanaOffices(s): Bonneville Power Administration

  3. CX-011176: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Chehalis-Raymond Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  4. CX-007781: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2012 CX(s) Applied: B1.3 Date: 01/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  5. CX-006063: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011CX(s) Applied: B1.3Date: 06/28/2011Location(s): Richland, WashingtonOffice(s): Office of River Protection-Richland Office

  6. CX-004100: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution Three-Dimensional Laser Imaging for Inspection, Maintenance, Repair and OperationsCX(s) Applied: B3.6Date: 09/30/2010Location(s): Boulder, ColoradoOffice(s): Fossil Energy, National Energy Technology Laboratory

  7. CX-004105: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    High Resolution Three-Dimensional Laser Imaging for Inspection, Maintenance, Repair and OperationsCX(s) Applied: B3.6Date: 09/30/2010Location(s): Houston, TexasOffice(s): Fossil Energy, National Energy Technology Laboratory

  8. CX-010592: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Big Eddy-Redmond Conductor Maintenance CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  9. CX-013443: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Substation Maintenance and Renovation Activities for 2015 CX(s) Applied: B1.3Date: 02/17/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region

  10. CX-004299: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Tree Cutting Cheyenne Field Office Maintenance AreaCX(s) Applied: B1.3Date: 10/21/2010Location(s): Larimer, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-005687: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Tree Cutting Cheyenne Field Office Maintenance Area, Spring 2011CX(s) Applied: B1.3Date: 04/07/2011Location(s): Larimer, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-005382: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Dawson County Maintenance Facility, Construction of Additional BuildingsCX(s) Applied: B1.11Date: 03/03/2011Location(s): Glendive, MontanaOffice(s): Western Area Power Administration-Upper Great Plains Region

  13. CX-010774: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy

  14. CX-013623: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Transmission Line Wood Pole Replacements and Access Road Maintenance within Bonneville Power Administration's the Dallas District CX(s) Applied: B1.3Date: 05/04/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  15. Rocky Flats Site, Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Quarterly Report of Site Surveillance and Maintenance Activities Second Quarter Calendar Year 2015 October 2015 LMS/RFS/S13352 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-2nd Quarter CY 2015 October 2015 Doc. No. S13352 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  16. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015

    Office of Legacy Management (LM)

    Colorado, Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2015 January 2016 LMS/RFS/S13687 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2015 January 2016 Doc. No. S13687 Page i Contents Abbreviations ................................................................................................................................. iv 1.0

  17. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

    2009-09-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

  18. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect (OSTI)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  19. Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility: Preprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility Preprint Rois Langner and Michael Deru National Renewable Energy Laboratory Alexander Zhivov, Richard Liesen, and Dale Herron U.S. Army Engineer Research and Development Center Presented at the 2012 ASHRAE Winter Conference Chicago, Illinois January 21-25, 2012 Conference Paper NREL/CP-5500-53810 March 2012 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy,

  20. Natural resources management activities and biodiversity maintenance. Progress report, July 1, 1993--June 30, 1994

    SciTech Connect (OSTI)

    Caudell, M.B.

    1994-05-01

    This progress report briefly outlines activities at the Crackerneck Wildlife Management Area. Thirty-nine days were spent administering hunts with 1524 people participating. Biological data was collected on 89 deer, 6 turkeys, 8 feral hogs, 40 ducks of two species, 24 bobwhite, 3 rabbits, 2 gray squirrels, and 313 fish of 8 species. Public relations, maintenance and hunt preparation activities are summarized as well.