Sample records for determination project number

  1. Project Name Project Number Tagging Type

    E-Print Network [OSTI]

    Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

  2. Master Project Assessment Form Student: ID number

    E-Print Network [OSTI]

    Franssen, Michael

    Master Project Assessment Form Student: ID number: Master Program: Graduation supervisor Graduation presentation Defense Execution of the project Grade Signature of supervisor Date * Hand in at the student administration (MF 3.068) together with an official result form (uitslagbon) #12;"Master Project

  3. Solving for the Particle-Number-Projected HFB Wavefunction

    E-Print Network [OSTI]

    L. Y. Jia

    2015-01-15T23:59:59.000Z

    Recently we proposed a particle-number-conserving theory for nuclear pairing [Jia, Phys. Rev. C 88, 044303 (2013)] through the generalized density matrix formalism. The relevant equations were solved for the case when each single-particle level has a distinct set of quantum numbers and could only pair with its time-reversed partner (BCS-type Hamiltonian). In this work we consider the more general situation when several single-particle levels could have the same set of quantum numbers and pairing among these levels is allowed (HFB-type Hamiltonian). The pair condensate wavefunction (the HFB wavefunction projected onto good particle number) is determined by the equations of motion for density matrix operators instead of the variation principle. The theory is tested in the simple two-level model with factorizable pairing interactions and the semi-realistic model with the zero-range delta interaction.

  4. Key Technology Poster Number Performer Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performer Project Title 1 Electric Power Research Institute Predicting the OxidationCorrosion Performance of Structural Alloys in Super Critical CO2 2 General Electric Company...

  5. PROJECT INFORMATION Project Number: S61268-583

    E-Print Network [OSTI]

    Barthelat, Francois

    ANALYSIS Narrative summary Expected results Performance measurement Assumptions and level of risk Goal and decision-makers with tools for developing IWRM policies in three DC's (Grenada, Guyana, Jamaica) by Year 6, Grenada and Guyana are committed to achieving and sustaining project results. Level of Risk: Low 2

  6. 1. Identification Number: 2. Program/Project Title: 3. Recipient

    E-Print Network [OSTI]

    Personal Property Report Forms Family Other(see special instructions) Frequency Addressees1 1. Identification Number: 2. Program/Project Title: 3. Recipient: 4. Reporting Requirements: A. MANAGEMENT REPORTING Research Performance Progress Report (RPPR) (RD&D Projects) Progress Report (Non

  7. Cash Flow Projection for Operating Loan Determination

    E-Print Network [OSTI]

    Klinefelter, Danny A.; McCorkle, Dean

    2009-02-04T23:59:59.000Z

    Corkle* *Professor and Extension Economist and Extension Program Specialist?Economic Accountability, The Texas A&M System. CASH FLOW PROJECTION FOR OPERATING LOAN DETERMINATION Name ___________________________________________________ Address...-Sows 191,200 800 47,000 900 47,000 700 45,000 800 49,000 2 3 Crops: Wheat 52,500 26,500 26,000 3 4 Grain Sorghum 2,700 2,700 4 5 5 6 Distributions from cooperatives 400 400 6 7 Agricultural program payments 3,100 1,550 1,550 7 8 Commodity credit loans 8 9...

  8. Caribbean Water Initiative (CARIWIN) Project number S61268-583

    E-Print Network [OSTI]

    Barthelat, Francois

    Caribbean Water Initiative (CARIWIN) Project number S61268-583 McGill University Caribbean, 2010 #12;List of acronyms AUCC ­ Association of Universities and Colleges of Canada CAFRA ­ Caribbean Institute for Feminist Research and Action CARDI ­ Caribbean Agricultural Research and Development Institute

  9. Caribbean Water Initiative (CARIWIN) Project number S61268-583

    E-Print Network [OSTI]

    Barthelat, Francois

    Caribbean Water Initiative (CARIWIN) Project number S61268-583 McGill University Caribbean, 2011 #12;List of acronyms AUCC ­ Association of Universities and Colleges of Canada CAFRA ­ Caribbean Institute for Feminist Research and Action CARDI ­ Caribbean Agricultural Research and Development Institute

  10. US LHC Accelerator Project Baseline Change Request BCR Number 58

    E-Print Network [OSTI]

    Large Hadron Collider Program

    to correspond to the current LHC installation schedule, constrained by the U.S. LHC Project end-of-project

  11. Table 1. Proposal Project Number 2008-307-00

    E-Print Network [OSTI]

    including the Pelton Round Butte Hydroelectric Project (PRB Project) which was completed in 1964 (Nehlsen 1995), are among the factors contributing to sockeye extinction. The PRB Project is owned and operated, a Settlement Agreement concerning the relicensing of the PRB Project was made by and among the Licensees and 21

  12. Categorical Exclusion Determinations: West Valley Demonstration Project |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas Categorical Exclusion Determinations:EnergyDepartment

  13. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  14. Calculation of the number of cancer deaths prevented by the Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    Miller, M.L.; Pomatto, C.B. (Roy F. Weston, Inc., Albuquerque, NM (United States)); Cornish, R.E. (Dept. of Energy, Albuquerque, NM (United States). Albuquerque Operations Office)

    1999-05-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action Project has completed remedial action at 22 uranium mill tailings sites and about 5,000 properties (vicinity properties) where tailings were used in construction, at a total cost of $1.45 billion. This paper uses existing data from Environmental Impact Statements and Environmental Assessments, and vicinity property calculations, to determine the total number of cancer deaths averted by the Uranium Mill Tailings Remedial Action Project. The cost-effectiveness of remediating each site, the vicinity properties, and the entire project is calculated. The cost per cancer death averted was four orders of magnitude higher at the least cost-effective site than at the most cost-effective site.

  15. MINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P-NUMBER Florida Atlantic University -Facilities Planning

    E-Print Network [OSTI]

    Fernandez, Eduardo

    -9-2103) Replace generator fuel tank. PendingP- Required Yes Yes 80,000 6125 MC-12 S Baruch Eliah Watlington ScottMINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P- NUMBER Florida,000 5858 MC-05 S Baruch Eliah Watlington Scott Baruch Pending TBD TBDTBD Morganti Quote received. Project

  16. Los Alamos Science: The Human Genome Project. Number 20, 1992

    SciTech Connect (OSTI)

    Cooper, N G; Shea, N [eds.

    1992-01-01T23:59:59.000Z

    This article provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  17. Course Profile: Project Management Course Number: LIS 7415

    E-Print Network [OSTI]

    Berdichevsky, Victor

    development life cycle 5. project management 6. operating and managing systems 7. modeling of system of information systems and their functions 2. components of information systems 3. system architecture 4. system

  18. Number of NERSC Users and Projects Through the Year

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparencyDOE Project TapsDOERecoveryNuclearLife Users and Projects

  19. Docket Number: 08-AFC-08A Project Title: Hydrogen Energy Center Application for Certification Amendment

    E-Print Network [OSTI]

    DOCKETED Docket Number: 08-AFC-08A Project Title: Hydrogen Energy Center Application FOR THE HYDROGEN ENERGY CALIFORNIA PROJECT Docket No. 08-AFC-08A NOTICE OF CALIFORNIA ENERGY COMMISSION COMMITTEE (CEC) is aware that the region surrounding the Hydrogen Energy California (HECA) project site has

  20. MINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P-NUMBER Florida Atlantic University -Facilities Planning

    E-Print Network [OSTI]

    Fernandez, Eduardo

    . 305, BOT Board Room NoP- Required Yes Yes 600,000 6196 JUPTR S Baruch Eliah Watlington Scott BaruchMINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P- NUMBER Florida review of wooden loft NAP- N/A No No 400 5407 CO-69 B Thompson" Russell Sawyer B.Thompson NA 6/17/13 3

  1. US LHC Accelerator Project Baseline Change Request BCR Number 59

    E-Print Network [OSTI]

    Large Hadron Collider Program

    .5.1 US PM, 1.5.3 FNAL PM Title FNAL-LHC Rebaseline Change Control Level 2 Originator Jim Kerby Date 18 Request BCR Number 59 WBS 1.1.1 IR Quads, 1.1.3 DFBX, 1.5.1 US PM, 1.5.3 FNAL PM Title FNAL-LHC Rebaseline,447,621 ($938,509) 1.1.1.1 Tooling $2,328,448 $2,180,725 ($147,723) 1.1.1.2 Cold Mass $5,401,839 $5

  2. Development projects in Pakistan are hiring increasing numbers of Pakistani female professionals to work on rural projects that

    E-Print Network [OSTI]

    Richner, Heinz

    Development projects in Pakistan are hiring increasing numbers of Pakistani female professionals. Policy message n Pakistan is a highly gender-segregated society, and more well-qualified female field for well-educat- ed Pakistani women Pakistan has one of the lowest female labour force

  3. Experimental design to determine the effect of temperature and Mach number on entropy noise

    E-Print Network [OSTI]

    Hake, Mariah I. (Mariah Inez)

    2014-01-01T23:59:59.000Z

    The Osney Laboratory sought to create an entropy noise test rig that could determine the relationship between entropy noise and the flow parameters of temperature change and nozzle Mach number. The apparatus simulates ...

  4. 2006-2605: DETERMINING HOW TO TEACH PROJECT MANAGEMENT CONCEPTS TO ENGINEERS

    E-Print Network [OSTI]

    Conrad, James M.

    either as a manager or as a member of the team. A recent survey included more than 100 senior-level PM2006-2605: DETERMINING HOW TO TEACH PROJECT MANAGEMENT CONCEPTS TO ENGINEERS James Conrad and a Certified Project Management Professional (PMP). He is also a member of Eta Kappa Nu, the Project Management

  5. determines the number of sodium spikes fired per event by individual cells (Maruta

    E-Print Network [OSTI]

    Oertner, Thomas

    determines the number of sodium spikes fired per event by individual cells (Maruta et al., 2007; Mathy et al., 2009) and may thereby mediate the direction and speed of learning in Purkinje cells (Mathy, apparently even down to the level of electrical synapses of the infe- rior olive (Lefler et al., 2014; Mathy

  6. Grant Title: ALCOHOL RESEARCH EDUCATION PROJECT GRANTS (R25) Funding Opportunity Number: PAR -11-205. CFDA Number(s) 93.273.

    E-Print Network [OSTI]

    Farritor, Shane

    -205. CFDA Number(s) 93.273. Agency/Department: Department of Health and Human Services (HHS), National

  7. Discrete Mathematics and Theoretical Computer Science DMTCS vol. 10:2, 2008, 7786 A Determinant of Stirling Cycle Numbers

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    of Stirling Cycle Numbers Counts Unlabeled Acyclic Single-Source Automata David Callan Department 2007, revised 7 May 2008, accepted 18 May 2008. We show that a determinant of Stirling cycle numbers a formula for the number of acyclic automata with a given set of sources. Keywords: Stirling cycle number

  8. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01T23:59:59.000Z

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  9. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01T23:59:59.000Z

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  10. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01T23:59:59.000Z

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  11. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  12. Method of producing a diesel fuel blend having a pre-determined flash-point and pre-determined increase in cetane number

    DOE Patents [OSTI]

    Waller, Francis Joseph; Quinn, Robert

    2004-07-06T23:59:59.000Z

    The present invention relates to a method of producing a diesel fuel blend having a pre-determined flash-point and a pre-determined increase in cetane number over the stock diesel fuel. Upon establishing the desired flash-point and increase in cetane number, an amount of a first oxygenate with a flash-point less than the flash-point of the stock diesel fuel and a cetane number equal to or greater than the cetane number of the stock diesel fuel is added to the stock diesel fuel in an amount sufficient to achieve the pre-determined increase in cetane number. Thereafter, an amount of a second oxygenate with a flash-point equal to or greater than the flash-point of the stock diesel fuel and a cetane number greater than the cetane number of the stock diesel fuel is added to the stock diesel fuel in an amount sufficient to achieve the pre-determined increase in cetane number.

  13. After the wind resource and project site have been determined and the community outreach effort has

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    permit application. See the Fact Sheets on resource assessment and wind resource data for more: Technology Performance Impacts & Issues Siting Resource Assessment Wind Data Permitting Case Studies 1. 2. 3After the wind resource and project site have been determined and the community outreach effort has

  14. Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

    SciTech Connect (OSTI)

    Michael A. Lehto, Ph.D.; Boyd D. Christensen

    2008-05-01T23:59:59.000Z

    Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by the INL for the four major modification determinations. Three of the four major modification determinations discussed herein were completed using the guidance specified in the draft of DOE STD-1189, Integration of Safety into the Design Process. DOE-STD-1189 was released as a draft document in March 2007 and provides guidance for integrating safety considerations into the early design activities for constructing new facilities or making modifications to existing nuclear facilities. The fourth major modification determination was prepared prior to the existence of DOE STD-1189 and was evaluated solely by the definition of a major modification given in 10 CFR 830.206. For all four projects, consideration was given to: Facility hazard categorization change and material inventory Facility footprint change with the potential to adversely affect credited safety function New or changed processes resulting in a change to the safety basis The use of new technology or equipment not approved for use in the facility The need for new or revised safety basis controls Hazards not previously evaluated in the safety basis.

  15. Integrated Biorefinery Project: Cooperative Research and Development Final Report, CRADA Number CRD-10-390

    SciTech Connect (OSTI)

    Chapeaux, A.; Schell, D.

    2013-06-01T23:59:59.000Z

    The Amyris-NREL CRADA is a sub-project of Amyris?s DOE-funded pilot-scale Integrated Biorefinery (IBR). The primary product of the Amyris IBR is Amyris Renewable Diesel. Secondary products will include lubricants, polymers and other petro-chemical substitutes. Amyris and its project partners will execute on a rapid project to integrate and leverage their collective expertise to enable the conversion of high-impact biomass feedstocks to these advanced, infrastructure-compatible products. The scope of the Amyris-NREL CRADA includes the laboratory development and pilot scale-up of bagasse pretreatment and enzymatic saccharification conditions by NREL for subsequent conversion of lignocellulosic sugar streams to Amyris Diesel and chemical products by Amyris. The CRADA scope also includes a techno-economic analysis of the overall production process of Amyris products from high-impact biomass feedstocks.

  16. Particle transfer reactions with the timedependent HartreeFock theory using a particle number projection technique

    E-Print Network [OSTI]

    Recanati, Catherine

    projection technique C??edric Simenel 1, 2, # 1 Department of Nuclear Physics, Research School of Physics+ 208 Pb reaction below the fusion barrier. The time evolution of the many­body wave function] and references therein). In nuclear physics, these approaches usually consider inde­ pendent particles evolving

  17. Healy Clean Coal Project. Quarterly technical progress report number 27, July 1--September 30, 1997

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    The Healy Clean Coal Project, selected by the US Department of Energy under Round 3 of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is 99.8% complete and scheduled for physical completion on November 15, 1997, with startup activity concluding in early 1998. Demonstration testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of nitrogen oxides, sulfur dioxide, and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The primary objective of the project is to demonstrate a new power plant design which features the innovative integration of an advanced combustor and heat recovery system coupled with both high- and low-temperature emission control processes. Equipment includes entrained combustion slagging systems coupled with a boiler which will produce low NOx levels, and function as a limestone calciner and first-stage SO{sub 2} remover in addition to its heat recovery function; a single spray dryer absorber vessel for second-stage SO{sub 2} removal; a baghouse for third-stage SO{sub 2} and particulate removal; and a lime activation system which recovers unused reagent from particulate collected in the baghouse.

  18. Laser-Based Mass Spectrometric Determination of Aggregation Numbers for Petroleum-and Coal-Derived Asphaltenes

    E-Print Network [OSTI]

    Zare, Richard N.

    Laser-Based Mass Spectrometric Determination of Aggregation Numbers for Petroleum- and Coal: Petroleum- and coal-derived asphaltenes have been studied with three laser-based mass spectrometric-MS), in which a single laser desorbs and ionizes solid analytes from an activated surface; and laser desorption

  19. Algae Biofuels Collaborative Project: Cooperative Research and Development Final Report, CRADA Number CRD-10-371

    SciTech Connect (OSTI)

    French, R. J.

    2012-04-01T23:59:59.000Z

    The goal of this project is to advance biofuels research on algal feedstocks and NREL's role in the project is to explore novel liquid extraction methods, gasification and pyrolysis as means to produce fuels from algae. To that end several different extraction methods were evaluated and numerous gasification and pyrolysis conditions were explored. It was found that mild hydrothermal treatment is a promising means to improve the extraction and conversion of lipids from algae over those produced by standard extraction methods. The algae were essentially found to gasify completely at a fairly low temperature of 750 degrees C in the presence of oxygen. Pyrolysis from 300-550 degrees C showed sequential release of phytene hydrocarbons, glycerides, and aromatics as temperature was increased. It appears that this has potential to release the glycerides from the non-fatty acid groups present in the polar lipids to produce a cleaner lipid. Further research is needed to quantify the pyrolysis and gasification yields, analyze the liquids produced and to test strategies for removing organic-nitrogen byproducts produced because of the high protein content of the feed. Possible strategies include use of high-lipid/low-protein algae or the use of catalytic pyrolysis.

  20. Configuration mixing of angular-momentum and particle-number projected triaxial HFB states using the Skyrme energy density functional

    E-Print Network [OSTI]

    M. Bender; P. -H. Heenen

    2008-08-07T23:59:59.000Z

    We present a method based on mean-field states generated by triaxial quadrupole constraints which are projected on particle number and angular momentum and mixed by the generator coordinate method on the quadrupole moment. This method is equivalent to a seven-dimensional GCM calculation, mixing all five degrees of freedom of the quadrupole operator and the gauge angles for protons and neutrons. A first application to Mg24 permits to analyze in detail the effects of triaxial deformations and of K-mixing.

  1. Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures; January 2012 - March 2013

    SciTech Connect (OSTI)

    Jayaweera, T.; Haeri, H.

    2013-04-01T23:59:59.000Z

    Under the Uniform Methods Project, DOE is developing a framework and a set of protocols for determining the energy savings from specific energy efficiency measures and programs. The protocols provide a straightforward method for evaluating gross energy savings for common residential and commercial measures offered in ratepayer-funded initiatives in the United States. They represent a refinement of the body of knowledge supporting energy efficiency evaluation, measurement, and verification (EM&V) activities. This document deals with savings from the following measures: commercial and industrial lighting, commercial and industrial lighting controls, small commercial and residential unitary and split system HVAC cooling equipment, residential furnaces and boilers, residential lighting, refrigerator recycling, whole-building retrofit using billing analysis, metering, peak demand and time-differentiated energy savings, sample design, survey design and implementation, and assessing persistence and other evaluation issues.

  2. Analysis of 2009 ENR Best Projects in Texas to Determine the Impact of Project Delivery System Used

    E-Print Network [OSTI]

    Rajan, Navaneethan

    2011-02-22T23:59:59.000Z

    Competitive Bidding, Competitive Sealed Proposal, construction management agency, construction management at risk, Design-Build, Design-Build-Bridging, and job order contracting are seven project delivery methods that are commonly used in the state...

  3. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAG EMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    NEPA DETERMINATION RECIPIENT:City of Virginia Beach PROJECT TITLE: Virginia Beach Wind Turbine Demonstration Project Page I of2 STATE: VA Funding Opportunity Announcement Number...

  4. CX-100018: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination Wind Generator Project CX(s) Applied: A9 Date: 08152014 Location(s): Michigan Offices(s): Golden Field Office Technology Office: Wind Program Award Number:...

  5. Project number: Faculty name

    E-Print Network [OSTI]

    Siegelmann , Hava T

    oversee apprentice Elizabeth Murphy Position of person overseeing apprentice Lab laboratory for the first time, the apprentice would work side-byside with the laboratory technician to feed to examine the feeding strategies used to capture these prey. The apprentice would receive training

  6. Determining importance and grading of items and activities for the Yucca Mountain Project

    SciTech Connect (OSTI)

    DeKlever, R. [Raytheon Services Nevada, Las Vegas, NV (United States); Verna, B. [Dept. of Energy, Las Vegas, NV (United States)

    1993-12-31T23:59:59.000Z

    Raytheon Services Nevada (RSN), in support of the Department of Energy`s (DOE) Yucca Mountain Project, has been responsible for the Title 2 designs of the initial structures, systems, and components for the Exploratory Studies Facility (ESF), and the creation of the design output documents for the Surface-Based Testing (SBT) programs. The ESF and SBT programs are major scientific contributors to the overall site characterization program which will determine the suitability of Yucca Mountain to contain a proposed High Level Nuclear Waste (HLNW) repository. Accurate, traceable and objective characterization and testing documentation that is germane to the protection of public health and safety, and the environment, and that satisfies all the requirements of 10 CFR Part 60(1), must be established, evaluated and accepted. To assure that these requirements are satisfied, specific design functions and products, including items and activities depicted within respective design output documents, are subjected to the requirements of an NRC and DOE-approved Quality Assurance (QA) program. An evaluation (classification) is applied to these items and activities to determine their importance to radiological safety (ITS) and waste isolation (ITWI). Subsequently, QA program controls are selected (grading) for the items and activities. RSN has developed a DOE-approved classification process that is based on probabilistic risk assessment (PRA) techniques and that uses accident/impact scenarios. Results from respective performance assessment and test interference evaluations are also integrated into the classification analyses for various items. The methodology and results of the RSN classification and grading processes, presented herein, relative to ESF and SBT design products, demonstrates a solid, defensible methodological basis for classification and grading.

  7. Categorical Excluslon DeterminatIon 11'orn1 Project Title: Bear Creek Road Deferred Maintenance Reduction Project (4550)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o .Fornl ProjectDeterminatIon 11'orn1 ......

  8. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01T23:59:59.000Z

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of a project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE fishery biologists requested data analysis to determine the project hydraulic extent based on the following criteria: 1) For areas where the mean velocities are less than 4 ft/s, the water velocity differences between operations are not greater than 0.5 ft/sec and /or the differences in water flow direction are not greater than 10 degrees, 2) If mean water velocity is 4.0 ft/second or greater the boundary is determined using the differences in water flow direction (i.e., not greater than 10 degrees). Based on these criteria, and excluding areas with a mean velocity of less than 0.1 ft/s (within the error of the model), a final set of graphics were developed that included data from all flows and all operations. Although each hydroelectric project has a different physical setting, there were some common results. The downstream hydraulic extent tended to be greater than the hydraulic extent in the forebay. The hydraulic extent of the projects tended to be larger at the mid-range flows. At higher flows, the channel geometry tends to reduce the impact of project operations.

  9. Mechanical analysis and simulation of in-motion vehicle scales. Final report/project accomplishments summary, CRADA Number 95-KCP-1013

    SciTech Connect (OSTI)

    Hower, B.

    1997-02-01T23:59:59.000Z

    A mechanical analysis and simulation was conducted on a weigh-in-motion vehicle scale used to weight motor trucks traveling at speeds of 2 to 45 mph. The objective of this project was to develop a detailed understanding of weigh-in-motion vehicle scale operation and system response to dynamic loading. AlliedSignal FM and T worked together with Cardinal Scale Manufacturing Company as a design team to determine the scale structure`s resonant frequency, determine a relationship between static and dynamic weights, determine variables that have significant influence on the accuracy of the scale, and design an algorithm that can be used to optimize the performance and simulate the operation of the scale. This project provided a detailed understanding of the weigh-in-motion scale operation and system response to dynamic loading. Weigh-in-motion scale engineers will use this knowledge to improve current scales and design new, improved scales. The project was completed as scheduled.

  10. be explained by the indirect aerosol cloud effect. The use of a parcel model to determine the cloud droplet number concentration

    E-Print Network [OSTI]

    Reiners, Peter W.

    cloud properties and their effect on the surface radiation budget: selected cases from FIRE ACE. Jbe explained by the indirect aerosol cloud effect. The use of a parcel model to determine the cloud droplet number concentration enables us to separate the effects of the cloud LWP and cloud droplet number

  11. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    SciTech Connect (OSTI)

    Wells, J.L.

    1997-03-01T23:59:59.000Z

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  12. High-speed microprocessor characterization. Final report/project accomplishments summary, CRADA Number KCP-94-1004

    SciTech Connect (OSTI)

    Brown, L.W.

    1997-03-01T23:59:59.000Z

    The objective of the project was to characterize and document the critical operating parameters of an 0.8-micron, 350-MHz, 32-bit microprocessor prototype. The roles of FM and T and the participant company were: FM and T -- evaluation performance of the prototype 32-bit microprocessor using the IDS5000 and Tektronix S3260 Integrated Circuit Test System; Corda -- design and build the prototype microprocessor. This project was terminated with nearly all of the planned activities unaddressed.

  13. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  14. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    SciTech Connect (OSTI)

    TEDESCHI AR

    2008-08-11T23:59:59.000Z

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  15. Determination of aerosol size distributions at uranium mill tailings remedial action project sites

    SciTech Connect (OSTI)

    Newton, G.J.; Reif, R.H. [CWM Federal Environmental Services, Inc., Albuquerque, NM (United States); Hoover, M.D.

    1994-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has an ongoing program, the Uranium Mill Tailings Remedial Action (UMTRA) Project, to stabilize piles of uranium mill tailings in order to reduce the potential radiological hazards to the public. Protection of workers and the general public against airborne radioactivity during remedial action is a top priority at the UMTRA Project. The primary occupational radionuclides of concern are {sup 230}Th, {sup 226}Ra, {sup 210}Pb, {sup 210}Po, and the short-lived decay products of {sup 222}Rn with {sup 230}Th causing the majority of the committed effective dose equivalent (CEDE) from inhaling uranium mill tailings. Prior to this study, a default particle size of 1.0 {mu}m activity median aerodynamic diameter (AMAD) was assumed for airborne radioactive tailings dust. Because of recent changes in DOE requirements, all DOE operations are now required to use the CEDE methodology, instead of the annual effective dose equivalent (AEDE) methodology, to evaluate internal radiation exposures. Under the transition from AEDE to CEDE, with a 1.0 {mu}m AMAD particle size, lower bioassay action levels would be required for the UMTRA Project. This translates into an expanded internal dosimetry program where significantly more bioassay monitoring would be required at the UMTRA Project sites. However, for situations where the particle size distribution is known to differ significantly from 1.0 {mu}m AMAD, the DOE allows for corrections to be made to both the estimated dose to workers and the derived air concentration (DAC) values. For particle sizes larger than 1.0 {mu}m AMAD, the calculated CEDE from inhaling tailings would be relatively lower.

  16. Developing governmental decision strategies for determining involvement in highly uncertain, large-scale capital investment projects

    E-Print Network [OSTI]

    Golden, Robert J

    1978-01-01T23:59:59.000Z

    to the project. Finally, in order to test the model's applicability in assisting governmental decision-makers to rationally allocate resources, the model has been empirically tested by a Westinghouse proposal (concerning offshore floating nuclear power... . Classification of Models . Models as a Frame of Reference The Contextual Matrix Development of the Matrix Model Methodology Exmployed to Utilize ~ ~ ~ ~ the 27 29 30 32 33 Matrix Framework . IV. WESTINGHOUSE'S OFFSHORE FLOATING NUCLEAR POWER PLANT...

  17. Note: The State Clearinghouse will assign identification numbers for all new projects. If a SCH number already exists for a project (e.g. Notice of Preparation or previous draft document) please fill in.

    E-Print Network [OSTI]

    : City: Zip: County: Project Location: County: City/Nearest Community: Cross Streets: Zip Code: Longitude Waste Land Use Drainage/Absorption Population/Housing Balance Toxic/Hazardous Cumulative Effects For LCNG Fueling Facility California Energy Commission Donald Coe 1516 Ninth Street (916) 654

  18. Formulae for the relative class number of an imaginary abelian eld in the form of a product of determinants

    E-Print Network [OSTI]

    Kuèera, Radan

    of determinants Radan Ku#20;cera 1 Abstract. There is in the literature a lot of deteminant formulae involv- ing

  19. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01T23:59:59.000Z

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. The Uniform Methods Project: Methods For Determining Energy Efficiency Savings For Specific Measures

    Broader source: Energy.gov [DOE]

    This document provides a set of model protocols for determining energy and demand savings that result from specific energy efficiency measures implemented through state and utility efficiency programs. The methods described here are approaches that are?or are among?the most commonly used in the energy efficiency industry for certain measures or programs.

  1. New York University -Export Control Checklist Use this checklist to assist in determining whether or not Export Control regulations apply to your project.

    E-Print Network [OSTI]

    Wang, Da-Neng

    New York University - Export Control Checklist Use this checklist to assist in determining whether or not Export Control regulations apply to your project. Does this project or agreement: YES NO Restrict List ("CCL") under the Export Administration Regulations ("EAR"; see http

  2. Determination

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign: Potential Application to ARM MeasurementsDetermination of

  3. Running loss emissions from in-use vehicles (CRC project number E-35-2). Final report

    SciTech Connect (OSTI)

    Haskew, H.M.; Eng, K.D.; Liberty, T.F.; Reuter, R.M.

    1999-02-01T23:59:59.000Z

    In Mesa, Arizona, a total of 150 vehicles were recruited at a local I/M lane and tested for running loss emissions at the Automotive Testing Labs (ATL). Running loss emissions were measured in a Running Loss SHED (Sealed Housing for Evaporative Determination) for a 25 minute, 7.5 mile trip on a hot summer day (95 deg F). Vehicles from model years 1971 through 1991 were tested. The program identified 30 vehicles as candidates for repair and retest. The result showed a very high (ca. 90%) effectiveness for the repairs. Repeat tests were run on 10 vehicles to provide an estimate for test-to-test variability.

  4. Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4

    SciTech Connect (OSTI)

    Denning, J.L.

    1994-09-01T23:59:59.000Z

    The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

  5. Scientific/Technical Report Science Literacy Project Award number-DE-FG02-06ER64286

    SciTech Connect (OSTI)

    Nasseh, Bizhan

    2011-02-28T23:59:59.000Z

    Ball State University (BSU) was the recipient of a U.S. Department of Energy award to develop educational games teaching science and math. The Science Media Program will merge Ball State Universitys nationally recognized capabilities in education, technology, and communication to develop new, interactive, game-based media for the teaching and learning of science and scientific principles for K-12 students. BSU established a team of educators, researchers, scientists, animators, designers, technology specialists, and hired a professional media developer company (Outside Source Design) from Indianapolis. After six months discussions and assessments the project team selected the following 8 games in Math, Physics, Chemistry, and Biology, 2 from each discipline. The assembled teams were innovative and unique. This new model of development and production included a process that integrated all needed knowledge and expertise for the development of high quality science and math games for K-12 students. This new model has potential to be used by others for the development of the educational games. The uniqueness of the model is to integrate domain experts knowledge with researchers/quality control group, and combine a professional development team from the game development company with the academic game development team from Computer Science and Art departments at Ball State University. The developed games went through feasibility tests with selected students for improvement before use in the research activities.

  6. Determination of the number of catalytic sites for ethylene-octene copolymers made with heterogeneous catalyst via interpretation of ?p13?sC NMR sequence distribution

    E-Print Network [OSTI]

    Moldovan, Daniel Gene

    1990-01-01T23:59:59.000Z

    DETERMINATION OF THE NUMBER OF CATALYTIC SITES FOR ETHYLENE-OCTENE COPOLYMERS MADE WITH HETEROGENEOUS CATALYST VIA INTERPRETATION OF C NMR SEQUENCE DISTRIBUTION A Thesis by DANIEL GENE MOLDOVAN Submitted to the Office of Graduate Studies... VIA INTERPRETATION OF C NMR SEQUENCE DISTRIBUTION A Thesis by DANIEL GENE MOLDOVAN Approved as to style and content by: C. A. J. oeve (Chair of t e committee) E. A. Meyers (Member) E. T. Ad m" (Member) J. S. Ham (Member) M. B. Hall (Head...

  7. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.

    SciTech Connect (OSTI)

    Simmons, M.; McKinstry, C.; Cook, C.

    2004-01-01T23:59:59.000Z

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a 3-day block throughout the study period. Hydroacoustic technology was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The hydroacoustic system in 2003 comprised seven splitbeam transducers arrayed in front of the strobe lights, two multibeam transducers behind the lights, and a mobile splitbeam system. The seven splitbeam transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. These transducers were spaced approximately 4 m apart on an aluminum frame floating upstream of the barge and looked vertically downward. The multibeam transducers monitored the distribution of fish directly behind and to both sides of the lights, while the mobile splitbeam system looked at the distribution of fish within the third powerplant forebay. To augment the hydroacoustic data, additional studies were conducted. The hydrodynamic characteristics of the third powerplant forebay were measured, and acoustically tagged juvenile kokanee were released upstream of the strobe lights and tracked within the forebay and downstream of the dam. Analysis of the effect of strobe lights on kokanee and rainbow trout focused on the number of fish detected in each of the areas covered by one of the downlooking transducers, the timing of fish arrivals after the status of the strobe lights changed, fish swimming effort (detected velocity minus flow velocity), and fish swimming direction. Water velocity measurements were used to determine fish swimming effort. The tracking of tagged kokanee provided data on fish movements into and out of the third powerplant forebay, including entrainment.

  8. 08/17/2006 12:09 PMOak Ridge National Laboratory -U.S. ITER Project Completes Management Team Page 1 of 2http://www.ornl.gov/ornlhome/print/press_release_print.cfm?ReleaseNumber=mr20060817-00

    E-Print Network [OSTI]

    1 of 2http://www.ornl.gov/ornlhome/print/press_release_print.cfm?ReleaseNumber=mr20060817 that began October 1, 2005, the 12-member contractor team will manage the U.S. contribution to ITER. ITER-USA. · Mr. Carl Strawbridge, Deputy Project Manager, of ORNL, who served as Deputy Project Manager

  9. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

    2003-01-01T23:59:59.000Z

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven-transducer splitbeam hydroacoustic system was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. Two of the seven transducers were mounted to the frame containing the strobe lights and were oriented horizontally. The remaining five transducers were spaced approximately 4 m apart on individual floating frames upstream of the barge, with the transducers looking vertically downward.

  10. Chief Joseph Kokanee Enhancement Project : Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grond Coulee Dam Third Powerplant Forebay.

    SciTech Connect (OSTI)

    Simmons, M.A.; McKinstry, C.A.; Simmons, C.S.

    2002-01-01T23:59:59.000Z

    Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC's Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the first year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory (PNNL). The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. Analysis of the effect of strobe lights on the distribution (numbers) and behavior of kokanee and rainbow trout was based on 51, 683 fish targets detected during the study period (June 30 through August 1, 2001). Study findings include the following: (1) Analysis of the count data indicated that significantly more fish were present when the lights were on compared to off. This was true for both the 24-hr tests as well as the 1-hr tests. Powerplant discharge, distance from lights, and date were significant factors in the analysis. (2) Behavioral results indicated that fish within 14 m of the lights were trying to avoid the lights by swimming across the lighted region or upstream. Fish were also swimming faster and straighter when the lights were on compared to off. (3) The behavioral results were most pronounced for medium- and large-sized fish at night. Medium-sized fish, based on acoustic target strength, were similar to the size of kokanee and rainbow trout released upstream of Grand Coulee Dam. Based on this study and general review of strobe lights, the researchers recommend several modifications and enhancements to the follow-on study in 2002. The recommendations include: (1) modifying the study design to include only the 24-hr on/off treatments, and controlling the discharge at the third powerplant, so it can be included as a design variable; and (2) providing additional data by beginning the study earlier (mid-May) to better capture the kokanee population, deploying an additional splitbeam transducer to sample the region close to the lights, and increasing the number of lights to provide better definition of the lit and unlit region.

  11. UTCA Project Number Report Date

    E-Print Network [OSTI]

    Pitt, Robert E.

    hazards, case studies, chemical accidents 18. Distribution Statement 19. Security Classif (of this report a variety of studies have been conducted on aspects of major transportation accidents, few have attempted associated with the transport of hazardous materials. While a variety of studies have been conducted on as

  12. Biology for Students: Bioinformatics The Human Genome Project (HGP) is an international effort to determine the biochemical code for

    E-Print Network [OSTI]

    Weng, Zhiping

    Biology for Students: Bioinformatics The Human Genome Project (HGP) is an international effort, Bioinformatics focuses on computational approaches. One aspect of Bioinformatics involves the development and their regulatory elements that serve as the blueprint of human biology. The HGP has generated massive data

  13. 3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers

    SciTech Connect (OSTI)

    Malcolm J. Andrews

    2006-04-14T23:59:59.000Z

    This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

  14. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  15. Feasibility Study of Supercritical Light Water Cooled Reactors for Electric Power Production, Nuclear Energy Research Initiative Project 2001-001, Westinghouse Electric Co. Grant Number: DE-FG07-02SF22533, Final Report

    SciTech Connect (OSTI)

    Philip E. MacDonald

    2005-01-01T23:59:59.000Z

    The supercritical water-cooled reactor (SCWR) is one of the six reactor technologies selected for research and development under the Generation IV program. SCWRs are promising advanced nuclear systems because of their high thermal efficiency (i.e., about 45% versus about 33% efficiency for current Light Water Reactors [LWRs]) and considerable plant simplification. SCWRs are basically LWRs operating at higher pressure and temperatures with a direct once-through cycle. Operation above the critical pressure eliminates coolant boiling, so the coolant remains single-phase throughout the system. Thus, the need for a pressurizer, steam generators, steam separators, and dryers is eliminated. The main mission of the SCWR is generation of low-cost electricity. It is built upon two proven technologies: LWRs, which are the most commonly deployed power generating reactors in the world, and supercritical fossil-fired boilers, a large number of which are also in use around the world. The reference SCWR design for the U.S. program is a direct cycle system operating at 25.0 MPa, with core inlet and outlet temperatures of 280 and 500 C, respectively. The coolant density decreases from about 760 kg/m3 at the core inlet to about 90 kg/m3 at the core outlet. The inlet flow splits with about 10% of the inlet flow going down the space between the core barrel and the reactor pressure vessel (the downcomer) and about 90% of the inlet flow going to the plenum at the top of the rector pressure vessel, to then flow down through the core in special water rods to the inlet plenum. Here it mixes with the feedwater from the downcomer and flows upward to remove the heat in the fuel channels. This strategy is employed to provide good moderation at the top of the core. The coolant is heated to about 500 C and delivered to the turbine. The purpose of this NERI project was to assess the reference U.S. Generation IV SCWR design and explore alternatives to determine feasibility. The project was organized into three tasks: Task 1. Fuel-cycle Neutronic Analysis and Reactor Core Design Task 2. Fuel Cladding and Structural Material Corrosion and Stress Corrosion Cracking Task 3. Plant Engineering and Reactor Safety Analysis. moderator rods. materials.

  16. Determining the Impact of MSW as a Feedstock Blending Agent Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S H I E LGeothermal * AugustDETERMINING PRICEDOE

  17. Physics from Angular Projection of Rectangular Grids

    E-Print Network [OSTI]

    Singh, Ashmeet

    2015-01-01T23:59:59.000Z

    In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple, yet interesting problem, has both a scholarly value and applications for data extraction techniques to study the physics of various systems. Our work can interest undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential ap...

  18. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01T23:59:59.000Z

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  19. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01T23:59:59.000Z

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. In situ testing to determination field-saturated hydraulic conductivity of UMTRA Project disposal cell covers, liners, and foundation areas. Special study

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This special study was conducted to prepare a guidance document for selecting in situ hydraulic conductivity (K) tests, comparing in situ testing methods, and evaluating the results of such tests. This report may be used as a practical decision-making tool by the Uranium Mill Tailings Remedial Action (UMTRA) Project staff to determine which testing method will most efficiently achieve the field-saturated K results needed for long-term planning. A detailed section on near-surface test methods discusses each method which may be applicable to characterization of UMTRA disposal cell covers, liners and foundation materials. These potentially applicable test methods include the sealed double-ring infiltrometer (SDRI), the air-entry permeameter (AEP), the guelph permeameter, the two-stage borehole technique (TSB), the pressure infiltrometer, and the disk permeameter. Analytical solutions for these methods are provided, and limitations of these solutions are discussed, and a description of testing equipment design and installation are provided.

  1. Identifying the Predictors of Female Project Managers' Salaries in the United States

    E-Print Network [OSTI]

    Kamranzadeh, Amineh

    2012-11-30T23:59:59.000Z

    This study seeks to explore the predictors of female project managers salary in the construction industry, and to analyze their impacts on determining the salary. Experience, age, marital status, motherhood, having children at home, and the number...

  2. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  3. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30T23:59:59.000Z

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  4. EIS-0470: Cape Wind Energy Project, Final General Conformity...

    Broader source: Energy.gov (indexed) [DOE]

    70: Cape Wind Energy Project, Final General Conformity Determination EIS-0470: Cape Wind Energy Project, Final General Conformity Determination Cape Wind Energy Project, Final...

  5. CX-011085: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-011085: Categorical Exclusion Determination Alaska Wind Energy Research Project (formally "St. Paul Wind Technology Development Project, Phase 2")...

  6. CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Estimated Project End Date

    E-Print Network [OSTI]

    Pennycook, Steve

    CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Phone Numbers: Project Manager: Field Representative: SHEST Representative: List of Hazardous Materials: Estimated Project End Date: Contractor/Service Subcontractor Name: Contractor/Service Subcontractor Address

  7. 2015 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

  8. Permanent Home Number: Residential Number

    E-Print Network [OSTI]

    Viglas, Anastasios

    Permanent Home Number: Residential Number: Mobile: Please update my contact details. Signature nominated correspondence address as indicated below. Permanent Home Adress Residential Address Other Address (Must not be a PO Box) Residential Address (Must not be a PO Box) Other - Postal/Optional Address

  9. UNIT NUMBER:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

  10. CX-005367: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    67: Categorical Exclusion Determination CX-005367: Categorical Exclusion Determination Project T-222 Hazardous Materials Management Emergency Response (HAMMER) Training Facility...

  11. Variation of direct-heat geothermal economics with project size

    SciTech Connect (OSTI)

    Struhsacker, D.W.

    1981-10-01T23:59:59.000Z

    A comparision of the economics of large, intermediate, and small direct-heat goethermal projects is presented. An attempt is made to define which types of direct-heat geothermal projects are most cost-efficient and produce the most energy for the least amount of money. The potential energy contribution of fourteen different sizes of direct heat projects is used to determine the number of projects of a given size required to produce 1 Quad of energy. The cost of developing 1 Quad of direct-heat geothermal energy from large, intermediate, and small projects is compared to the cost of 1 Quad of energy from conventional sources. The engineering and resource parameters controlling project size are defined. The development of large-scale projects is stressed as the way in which direct-heat geothermal energy can make the most significant contribution to the nation's energy requirements. (MJF)

  12. Research Projects in Industrial Technology.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Industrial Technology Section.

    1990-06-01T23:59:59.000Z

    The purpose of this booklet is to briefly describe ongoing and completed projects being carried out by Bonneville Power Administration's (BPA) Industrial Technology Section. In the Pacific Northwest, the industrial sector is the largest of the four consuming sectors. It accounted for thirty-nine percent of the total firm demand in the region in 1987. It is not easy to asses the conservation potential in the industrial sector. Recognizing this, the Northwest Power Planning Council established an objective to gain information on the size, cost, and availability of the conservation resource in the industrial sector, as well as other sectors, in its 1986 Power Plan. Specifically, the Council recommended that BPA operate a research and development program in conjunction with industry to determine the potential costs and savings from efficiency improvements in industrial processes which apply to a wide array of industrial firms.'' The section, composed of multidisciplinary engineers, provides technical support to the Industrial Programs Branch by designing and carrying out research relating to energy conservation in the industrial sector. The projects contained in this booklet are arranged by sector --industrial, utility, and agricultural -- and, within each sector, chronologically from ongoing to completed, with those projects completed most recently falling first. For each project the following information is given: its objective approach, key findings, cost, and contact person. Completed projects also include the date of completion, a report title, and report number.

  13. Change Number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccessAlamos LaboratoryCertified Reference6-02-01Change Number

  14. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  15. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: 51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  16. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.

    SciTech Connect (OSTI)

    Simmons, M.; Johnson, Robert; McKinstry, C. [Pacific Northwest National Laboratory

    2006-03-01T23:59:59.000Z

    The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock openings, fish would avoid the lighted regions. Four omnidirectional strobe lights were deployed on the one trash rack directly in front of one turbine penstock. Seven splitbeam transducers were deployed to monitor fish approaching three penstock openings either from in front of the trash racks or moving down the dam behind the trash racks. Four key results emerged from the 2005 study. The results provide insight into the current level of entrainment and how fish respond to strobe lights under high flow conditions. First, very few fish were detected inside the trash racks. Of the more than 3,200 targets identified by the data processing, less than 100 were detected inside the trash racks. Only 23 fish were found inside the trash racks behind the strobe lights. Of those 21 fish, 13 were detected when the lights were on. Most of the fish detected behind the trash racks were above the turbine penstock but were headed downward. No fish were detected at night when minimal flows occurred between midnight and 4:00 a.m. Second, significantly more fish (P < 0.001) were detected in front of the trash racks when the lights were on at night. On a count-per-hour basis, the difference between lights off and lights on was apparent in the early morning hours at depths between 25 m and 50 m from the transducers. The lights were approximately 34 m below the splitbeam transducers, and fish detected at night with lights on were found at a median depth of approximately 35 m, compared to a median depth of from 20.6 to 23.5 m when the lights were off. The differences in depth between lights on and off at night were also significant (P < 0.001). Additionally, the increase in fish occurred only in front of the trash rack where the strobe lights were mounted; there was no increase in the number of detections by the transducers aimed away from the lights. Third, fish clearly manifested a behavioral response to the strobe lights during the day. When the lights were on, fish detected by three of the four transducers generally were swimming north, parallel to the face of the dam. Howeve

  17. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  18. EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore...

    Broader source: Energy.gov (indexed) [DOE]

    June 25, 2014 EIS-0470: Cape Wind Energy Project, Final General Conformity Determination Cape Wind Energy Project, Final General Conformity Determination, June 23, 2014 December...

  19. Physics from Angular Projection of Rectangular Grids

    E-Print Network [OSTI]

    Ashmeet Singh

    2014-12-08T23:59:59.000Z

    In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple, yet interesting problem, has both a scholarly value and applications for data extraction techniques to study the physics of various systems. Our work can interest undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential applications in various branches of physical sciences including crystallography, astrophysics and bulk properties of materials.

  20. CX: Categorical Determination-Alcoa Tennessee Automotive Sheet...

    Office of Environmental Management (EM)

    CX: Categorical Determination-Alcoa Tennessee Automotive Sheet Expansion Project CX: Categorical Determination-Alcoa Tennessee Automotive Sheet Expansion Project Categorical...

  1. Study of catalytic diffusion in coal. Final report for 1983/1984 SOMED Project. [Determination of pore (hole) size and pore shape distribution

    SciTech Connect (OSTI)

    Kispert, L.D.

    1984-09-01T23:59:59.000Z

    The purpose of our studies is to determine the pore (hole) size and pore shape distribution in standard bituminous coal samples from various Alabama coal seams such as that of the Mary Lee, Black Creek and Pratt during and after swelling of the coal with different solvents at various temperatures. These samples come from the Penn State Coal Sample Bank at Pennsylvania State University Coal Research Section and from Alabama's Mineral Industries. Methods have been developed in the laboratory whereby free radical probes of varying sizes can be diffused into the coal under various conditions. These probes can be detected and the environment surrounding the probes can be deduced by electron paramagnetic resonance (EPR) methods. To date, we have found that not only can the shape and size of the pores be determined, but that the size distribution varies from one bituminous coal seam to another, even for coal of the same rank, suggesting a different optimal catalyst should be used for each seam. The effect of oxygen on the coal samples during grinding has been studied; however, the free radical technique appears to be insensitive to the presence of oxygen effects. It is our goal to determine the structural differences between various bituminous coals. 9 references, 9 figures, 1 table.

  2. RECIPIENT:City of Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator

    Broader source: Energy.gov (indexed) [DOE]

    Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator " ) STATE: MI Funding Opportunity Announcement Number ProcurementInstrument Number NEPA Control Number CID Number DE-EE0000447...

  3. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  4. Number of Graduates 78 Number of Graduates

    E-Print Network [OSTI]

    O'Toole, Alice J.

    Developer I AT&T Associate Project Manager IT Merkle Business Systems Analyst AudioCodes Customer Support Enterprise Project Manager Dolphin Corporation SAP ILM Consultant Southwest Airlines (2) Business Analyst Encore Payment Systems Decision Support Analyst Software Engineer Ericsson (2) Associate Project

  5. CX-011391: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-011391: Categorical Exclusion Determination Municipal Complex Solar Power Project CX(s) Applied: B3.14 Date: 12102013 Location(s): New Jersey...

  6. CX-007111: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-007111: Categorical Exclusion Determination Shallow Carbon Sequestration Demonstration Project (Iatan Generating Station) CX(s) Applied: B3.1...

  7. CX-007118: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-007118: Categorical Exclusion Determination Shallow Carbon Sequestration Demonstration Project CX(s) Applied: B3.1 Date: 10042011...

  8. CX-007388: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-007388: Categorical Exclusion Determination Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC) CX(s) Applied: B1.15,...

  9. CX-008235: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-008235: Categorical Exclusion Determination Harnessing the Hydro-Electric Potential of Engineered Drops in the Columbia Basin Project: Phase 1 CX(s)...

  10. CX-003904: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    904: Categorical Exclusion Determination CX-003904: Categorical Exclusion Determination Hydro Electric Project - Snohomish Public Utility District CX(s) Applied: A9, A11, B5.1...

  11. CX-003208: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-003208: Categorical Exclusion Determination Michigan 85% Ethanol Fuel (E85) Infrastructure Project CX(s) Applied: B5.1 Date: 08032010 Location(s):...

  12. CX-003471: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-003471: Categorical Exclusion Determination Pennsylvania Ethanol Fuel (E85) Corridor Project - Lew's Service Center CX(s) Applied: B5.1 Date: 0823...

  13. CX-001403: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-001403: Categorical Exclusion Determination West New York Energy Efficiency Projects CX(s) Applied: B5.1 Date: 04092010 Location(s): West New...

  14. CX-012117: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-012117: Categorical Exclusion Determination Fuel Cell Hybrid Walk-In Van Deployment Project CX(s) Applied: A9 Date: 05212014 Location(s):...

  15. CX-000653: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-000653: Categorical Exclusion Determination Helios - Project: Photovoltaic Crystalline Module Assembly Plant CX(s) Applied: B5.1 Date: 01272010 Location(s):...

  16. CX-002945: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-002945: Categorical Exclusion Determination Pennsylvania Green Energy Works Targeted Grant - Native Energy Biogas Project CX(s) Applied: B1.15,...

  17. CX-012201: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-012201: Categorical Exclusion Determination Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a....

  18. CX-000998: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000998: Categorical Exclusion Determination Biodiesel Infrastructure Project (Coulee) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  19. CX-000712: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000712: Categorical Exclusion Determination Biodiesel Infrastructure Project (Coulee) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  20. CX-006500: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006500: Categorical Exclusion Determination Magellan Des Moines Biodiesel Terminal Project CX(s) Applied: B5.1 Date: 09062011 Location(s): Des Moines, Iowa...

  1. CX-002698: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    98: Categorical Exclusion Determination CX-002698: Categorical Exclusion Determination Seismic Testing (Under Task 5 of Statement of Project Objectives) CX(s) Applied: B3.1 Date:...

  2. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  3. Final Technical Report Advanced Anchoring Technology DOE Award Number DE-EE0003632 Project Period 09/10 -???????? 09/12

    SciTech Connect (OSTI)

    Meggitt, Dallas J.

    2012-11-09T23:59:59.000Z

    It is generally conceded that the costs associated with current practices for the mooring, anchoring, or foundation systems of Marine HydroKinetic (MHK) and Deepwater Floating Wind systems are a disproportionate portion of the total cost of an installed system. Reducing the cost of the mooring and anchoring components for MHK systems can contribute substantially to reducing the levelized cost of electricity (LCOE). Micropile anchors can reduce the LCOE both directly, because the anchors, associated mooring hardware and installation costs are less than conventional anchor and mooring systems, but also because micropile anchors require less extensive geotechnical surveys for confident design and proper implementation of an anchor or foundation system. This report presents the results of the development of critical elements of grouted marine micropile anchor (MMA) technology for application to MHK energy conversion systems and other ocean engineering applications that require fixing equipment to the seafloor. Specifically, this project identified grout formulations and developed designs for grout dispensing systems suitable for use in a seawater environment as a critical development need for successful implementation of practical MMA systems. The project conducted a thorough review of available information on the use of cement-based grouts in seawater. Based on this review and data available from commercial sources, the project selected a range of grout formulations for testing as part of a micropile system. The project also reviewed instrumentation for measuring grout density, pressure and flow rate, and integrated an instrumentation system suitable for use with micropile installation. The grout formulations and instrumentation system were tested successfully and demonstrated the suitability of MMA technology for implementation into anchor systems for MHK and other marine renewable energy systems. In addition, this project developed conceptual designs for micropile anchor systems and the associated drilling and grouting systems to demonstrate the feasibility and practicality of micropile anchors. This report presents several conceptual system designs for different applications. This project has concluded that grouted marine micropile anchor technology is practical and very attractive technically and financially for marine renewable energy applications. This technology is considered to be at a Technology Readiness Level 5.

  4. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

  5. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: 1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  6. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: 3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: Building fabric replacement and revised space planning New mechanical and electrical

  7. Categorical Exclusion Determinations: Portsmouth Paducah Project Office |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergy BushCalifornia9HampshirePennsylvania Categorical

  8. Categorical Exclusion Determinations: Advanced Research Projects

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom:EnergyJoshuaThisAgency-Energy | Department

  9. Jobs and Renewable Energy Project

    SciTech Connect (OSTI)

    Sterzinger, George

    2006-12-19T23:59:59.000Z

    Early in 2002, REPP developed the Jobs Calculator, a tool that calculates the number of direct jobs resulting from renewable energy development under RPS (Renewable Portfolio Standard) legislation or other programs to accelerate renewable energy development. The calculator is based on a survey of current industry practices to assess the number and type of jobs that will result from the enactment of a RPS. This project built upon and significantly enhanced the initial Jobs Calculator model by (1) expanding the survey to include other renewable technologies (the original model was limited to wind, solar PV and biomass co-firing technologies); (2) more precisely calculating the economic development benefits related to renewable energy development; (3) completing and regularly updating the survey of the commercially active renewable energy firms to determine kinds and number of jobs directly created; and (4) developing and implementing a technology to locate where the economic activity related to each type of renewable technology is likely to occur. REPP worked directly with groups in the State of Nevada to interpret the results and develop policies to capture as much of the economic benefits as possible for the state through technology selection, training program options, and outreach to manufacturing groups.

  10. On the Number of Connected Components of the Relative Closure ...

    E-Print Network [OSTI]

    1910-20-53T23:59:59.000Z

    usual definitions related to Pfaffian functions, then we cover the essential material .... Counting the number of critical points of a generic projection, we obtain the.

  11. DOMB'S NUMBERS AND RAMANUJANSATO TYPE SERIES FOR 1/#

    E-Print Network [OSTI]

    DOMB'S NUMBERS AND RAMANUJAN­SATO TYPE SERIES FOR 1/# HENG HUAT CHAN, SONG HENG CHAN, AND ZHIGUO of Singapore Academic Research Fund, Project Number R146000027112. 1 #12; 2 HENG HUAT CHAN, SONG HENG CHAN

  12. Technical Support to SBIR Phase II Project: Improved Conversion of Cellulose Waste to Ethanol Using a Dual Bioreactor System: Cooperative Research and Development Final Report, CRADA Number CRD-08-310

    SciTech Connect (OSTI)

    Zhang, M.

    2013-04-01T23:59:59.000Z

    Over-dependence on fossil fuel has spurred research on alternative energy. Inedible plant materials such as grass and corn stover represent abundant renewable natural resources that can be transformed into biofuel. Problems in enzymatic conversion of biomass to sugars include the use of incomplete synergistic enzymes, end-product inhibition, and adsorption and loss of enzymes necessitating their use in large quantities. Technova Corporation will develop a defined consortium of natural microorganisms that will efficiently break down biomass to energy-rich soluble sugars, and convert them to cleaner-burning ethanol fuel. The project will also develop a novel biocatalytic hybrid reactor system dedicated to this bioprocess, which embodies recent advances in nanotechnology. NREL will participate to develop a continuous fermentation process.

  13. Midwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  14. Northwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  15. ESPC Project Performance: 2013 Supplemental Data | Department...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Social Security Number Reduction Project US Energy Production over the Years Data Noise and Vibration Impact Assessment Methodology...

  16. Pacific Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  17. Northeast Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  18. 2015 RENEWABLE ENERGY PROJECT DEVELOPMENT AND FINANCE WORKSHOP

    Office of Environmental Management (EM)

    for and potential pitfalls of developing and financing community and facility scale renewable energy projects 2) Determine how the development of a renewable energy project could...

  19. CX-000485: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Project Number BM-09-111 - Provide Clear Zone Around Bryan MoundCX(s) Applied: B1.3Date: 01/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office

  20. Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership

    SciTech Connect (OSTI)

    Robert Lee; Reid Grigg; Brian McPherson

    2011-04-15T23:59:59.000Z

    Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.

  1. Participant number in this

    E-Print Network [OSTI]

    Hoffmeister, Thomas S.

    the grant agreement or to commit the organisation for this project Family name Kuehne First name(s) Rolf

  2. CX-000658: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-000658: Categorical Exclusion Determination Gilt Edge Mine Wind Resource Assessment; National Renewable Energy Laboratory Tracking Number 10-009 CX(s)...

  3. CX-003226: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-003226: Categorical Exclusion Determination Parris Island Wind Resource Assessment; National Renewable Energy Laboratory Tracking Number 10-032 CX(s)...

  4. CX-001393: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-001393: Categorical Exclusion Determination High Penetration of Photovoltaic Generation - Award Number DE-EE0002060 Date: 03212010 Location(s): Arizona...

  5. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  6. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  7. GEOCENTRIFUGE STUDIES OF FLOW AND TRANSPORT IN POROUS MEDIA, FINAL REPORT FOR GRANT NUMBER DE-FG02-03ER63567 TO THE UNIVERSITY OF IDAHO (RW SMITH), ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM PROJECT NUMBER 86598, COUPLED FLOW AND REACTIVITY IN VARIABLY SATURATED POROUS MEDIA

    SciTech Connect (OSTI)

    Robert W. Smith; Carl D. Palmer; Earl D. Mattson

    2007-06-15T23:59:59.000Z

    Improved models of contaminant migration in heterogeneous, variably saturated porous media are required to better define the long-term stewardship requirements for U.S. Department of Energy (DOE) lands and to assist in the design of effective vadose-zone barriers to contaminant migrations. The development of these improved models requires field and laboratory results to evaluate their efficacy. However, controlled laboratory experiments simulating vadose conditions can require extensive period of time, and often are conducted at condition near saturation rather than the much drier conditions common in many contaminated arid vadose zone sites. Collaborative research undertaken by the Idaho National Laboratory (INL) and the University of Idaho as part of this Environmental Management Science Program project focused on the development and evaluation of geocentrifuge techniques and equipment that allows vadose zone experiments to be conducted for relevant conditions in time frames not possible in conventional bench top experiments. A key and novel aspect of the research was the use of the 2-meter radius geocentrifuge capabilities at the Idaho National Laboratory to conduct unsaturated transport experiments. Specifically, the following activities were conducted ** Reviewing of the theory of unsaturated flow in the geocentrifuge to establish the range of centrifuge accelerations/experimental conditions and the translation of centrifuge results to 1 gravity applications. ** Designing, constructing, and testing of in-flight experimental apparatus allowing the replication of traditional bench top unsaturated transport experiments on the geocentrifuge. ** Performing unsaturated 1-dimenstional column geocentrifuge experiments using conservative tracers to evaluate the effects of increased centrifugal acceleration on derived transport properties and assessing the scaling relationships for these properties. Because the application of geocentrifuge techniques to vadose transport is in its infancy experimental apparatus such as pumps, flow meters, columns, fraction collectors, etc. that would reliably function under the increased self weight experienced on the centrifuge had to be developed and tested as part of this project. Although, we initially planed to conduct experiments using reactive tracer and 2-dimensional heterogeneities, the cost and time associated with designing, building, and testing of experimental apparatus limited our experimental program to conservative tracer experiments using 1-dimensional columns. The results we obtained in this study indicate that the geocentrifuge technique is a viable experimental method for the study of subsurface processes where gravitational acceleration is important. The geocentrifuge allows experiments to be completed more quickly than tests conducted at 1-g, can be used to experimentally address important scaling issues, and permits experiments under a range of conditions that would be difficult or impossible using conventional approaches. The application of the geocentrifuge approaches and associated models developed in this project allows more meaningful investigation of DOE relevant vadose-zone issues under scalable conditions in time frames previously not obtainable.

  8. Silver Peak Innovative Exploration Project

    Broader source: Energy.gov [DOE]

    DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

  9. Hyper Space Complex Number

    E-Print Network [OSTI]

    Shanguang Tan

    2007-04-23T23:59:59.000Z

    A new kind of numbers called Hyper Space Complex Numbers and its algebras are defined and proved. It is with good properties as the classic Complex Numbers, such as expressed in coordinates, triangular and exponent forms and following the associative and commutative laws of addition and multiplication. So the classic Complex Number is developed from in complex plane with two dimensions to in complex space with N dimensions and the number system is enlarged also.

  10. Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03T23:59:59.000Z

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Admin Chg 1, dated 10-12-11, cancels DOE G 413.3-19.

  11. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30T23:59:59.000Z

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  12. CapitalProjects TrackingManual

    E-Print Network [OSTI]

    the Colorado School of Mine's capital projects from inception to completion. The task of monitoring#_____________ 1. Check Budget for required signatures 2. Assign Index Number from excel file "Available 9xxxxx projects 2. FM = 51886 for Facilities Management projects 4. Assign Program code 1. 1700 = Operation/Maintenance

  13. Graduate Assistant Stipend Enhancement Project Proposal Type

    E-Print Network [OSTI]

    Karonis, Nicholas T.

    1 Graduate Assistant Stipend Enhancement Project Proposal Type The Graduate Assistant Stipend Strategic Plan. Goals The Graduate Assistant Stipend Enhancement project consists of two programs: the Great. Fundamentally, the project seeks to increase the number of graduate students who receive assistantships

  14. Critical in PROJECT TITLE COMMENTS BPA NPCC

    E-Print Network [OSTI]

    PLANNING AND CONSERVATION COUNCIL AND BONNEVILLE POWER ADMINISTRATION "RANKINGS" FOR PROJECTS UNDER in annual planning budget and feasibility of approach to achieve efficiencies. BPA reduced by $250PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop

  15. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  16. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  17. NREL Smart Grid Projects

    SciTech Connect (OSTI)

    Hambrick, J.

    2012-01-01T23:59:59.000Z

    Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

  18. Categorical Exclusion Determinations: Office of River Protection...

    Energy Savers [EERE]

    Operations Office July 3, 2014 CX-012329: Categorical Exclusion Determination PNNL Projects Involving Small-Scale Research and Development, Laboratory Operations, and...

  19. CX-003403: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-003403: Categorical Exclusion Determination The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal Exploration CX(s) Applied: A9, B3.7...

  20. CX-002745: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-002745: Categorical Exclusion Determination The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal Exploration CX(s) Applied: B3.1, A9...

  1. CX-007358: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination Integration of the University of Oregon's Cogeneration Project CX(s) Applied: B1.7 Date: 12012011 Location(s): Oregon Offices(s):...

  2. CX-004085: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Project T-221, Hazardous Material Management and Emergency Response (HAMMER) Operations Building CX(s) Applied: B1.15 Date: 10082010 Location(s): Richmond,...

  3. CX-004376: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination City of Woodward, Oklahoma Ground Source Heat Pump Project Beyond State Template CX(s) Applied: B5.1 Date: 11012010 Location(s):...

  4. CX-005076: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-005076: Categorical Exclusion Determination Jefferson County Sheriff's Department Propane Infrastructure Project CX(s) Applied: B5.1 Date: 01272011 Location(s): Jefferson,...

  5. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  6. Seismic safety margins research program. Project I SONGS 1 AFWS Project

    SciTech Connect (OSTI)

    Chuang, T.Y.; Smith, P.D.; Dong, R.G.; Bernreuter, D.L.; Bohn, M.P.; Cummings, G.E.; Wells, J.E.

    1981-02-24T23:59:59.000Z

    The seismic qualification requirements of auxiliary feedwater systems (AFWS) of Pressurized Water Reactors (PWR) were developed over a number of years. These are formalized in the publication General Design Criteria (Appendix A to 10CFR50). The full recognition of the system as an engineered safety feature did not occur until publication of the Standard Review Plan (1975). Efforts to determine how to backfit seismic requirements to earlier plants has been undertaken primarily in the Systematic Evaluation Program (SEP) for a limited number of operating reactors. Nuclear Reactor Research (RES) and NRR have requested LLNL to perform a probabilistic study on the AFWS of San Onofre Nuclear Generating Station (SONGS) Unit 1 utilizing the tools developed by the Seismic Safety Margins Research Program (SSMRP). The main objectives of this project are to: identify the weak links of AFWS; compare the failure probabilities of SONGS 1 and Zion 1 AFWS: and compare the seismic responses due to different input spectra and design values.

  7. Using Integrated Project Delivery (IPD) to Resolve the Major Construction Project Delay Causes in Saudi Arabia

    E-Print Network [OSTI]

    Alkhalid, Khalid Abdullah

    2011-12-16T23:59:59.000Z

    Integrated Project Delivery (IPD) has gained attention in the United States and Europe as an effective delivery method for construction projects. The aim of this research paper is to determine the major causes of delay in ...

  8. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    SciTech Connect (OSTI)

    Not Available

    1982-06-01T23:59:59.000Z

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  9. NUMBER: 1626 TITLE: Information Technology Management

    E-Print Network [OSTI]

    cost of more than $100,000 but less than $1 million. E. University Advisory Council on Technology (UACT technology project estimated to cost $1 million or more or deemed to be mission-critical. VI. Designated1626 - 1 NUMBER: 1626 TITLE: Information Technology Management APPROVED: September 9, 2005 I

  10. CX-008152: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05012012 Location(s): Montana Offices(s):...

  11. CX-011803: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-011803: Categorical Exclusion Determination South Louisiana EORSequestration Research and Development Project CX(s) Applied: A1, A9, A11, B3.6 Date:...

  12. CX-000683: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    3: Categorical Exclusion Determination CX-000683: Categorical Exclusion Determination Materials and Fuel Complex Dial Room Replacement Project CX(s) Applied: B1.7, B1.15 Date: 02...

  13. CX-010690: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-010690: Categorical Exclusion Determination Alaska Wind Energy Research Project CX(s) Applied: A9, B2.2, B3.1 Date: 07032013 Location(s): Alaska...

  14. CX-002855: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-002855: Categorical Exclusion Determination Whitefish In-Line Hydro-Electric Project CX(s) Applied: B5.1 Date: 07012010 Location(s): Whitefish, Montana...

  15. CX-012109: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Categorical Exclusion Determination CX-012109: Categorical Exclusion Determination Solar Energy Parking Canopy Demonstration Project CX(s) Applied: A9, B1.15, B5.16 Date: 0505...

  16. CX-006772: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006772: Categorical Exclusion Determination Coal-Based Integrated Gasification Fuel Cell Project: Phase II CX(s) Applied: B3.6 Date: 09162011 Location(s):...

  17. CX-006773: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006773: Categorical Exclusion Determination Coal-Based Integrated Gasification Fuel Cell Project: Phase II CX(s) Applied: B3.6 Date: 09162011 Location(s):...

  18. CX-006770: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006770: Categorical Exclusion Determination Coal-Based Integrated Gasification Fuel Cell Project: Phase II CX(s) Applied: B3.6 Date: 09162011 Location(s): South...

  19. CX-006771: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006771: Categorical Exclusion Determination Coal-Based Integrated Gasification Fuel Cell Project: Phase II CX(s) Applied: B3.6 Date: 09162011 Location(s):...

  20. CX-001733: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-001733: Categorical Exclusion Determination Virginia Beach Wind Turbine Demonstration Project CX(s) Applied: B3.6, A9, A11, B5.1 Date: 04222010...

  1. CX-010688: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-010688: Categorical Exclusion Determination Optimization Project 3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07262013 Location(s):...

  2. CX-010687: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-010687: Categorical Exclusion Determination Optimization Project Area 1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07262013 Location(s):...

  3. CX-010541: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-010541: Categorical Exclusion Determination Optimization Project Area 2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06282013 Location(s):...

  4. CX-000711: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000711: Categorical Exclusion Determination Biodiesel In-line Blending Project (Innovation) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  5. CX-000999: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000999: Categorical Exclusion Determination Biodiesel In-line Blending Project (Innovation) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  6. DOE/ID-Number

    Office of Scientific and Technical Information (OSTI)

    salt droplets at process temperature to support development of material balance and control systems in a used fuel treatment facility. In FY13, the project focused on testing a...

  7. NAME PROJECT NUMBER AGENCY NAME TITLE Award Amt based

    E-Print Network [OSTI]

    Arnold, Jonathan

    MANAGEMENT OF KUDZU BUGS ON SOYBEAN IN GEORGIA $4,000 046583 PIONEER HI-BRED INATL BT SOYBEAN: EFFICACY RESISTANCE MOLECULAR MARKERS IN SOYBEAN FOR MANAGEMENT OF STEM FEEDING KUDZU BUGS AND LEAF FEEDING INSECTS

  8. Columbia River Basin Accords -Narrative Proposal Project Number 200845800 1

    E-Print Network [OSTI]

    proposes to take advantage of iteroparity in natural-origin (NOR) steelhead populations to increase,000 fish) between 1941-1954 (Mullan et al. 1992). Subsequent to this dramatic increase, wild stock escapements to the Columbia Basin have fluctuated widely. Wild stock productivity and abundance declined again

  9. Key Technology Poster Number Performer Project Title Presenter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Multi-Phase Turbo-Expander Vitali Lissianski 24 Gas Technology Institute Simultaneous Waste Heat and Water Recovery from Power Plant Flue Gases for Advanced Energy System Dexin...

  10. Social Security Number Reduction Project | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebookScholarship Fund3Biology| Nationalof Energy Snapshots

  11. Project Registration Number Assignments (Active) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of Energy TEESAdoption Barriers in

  12. Project Registration Number Assignments (Completed) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of Energy TEESAdoption Barriers inCompleted)

  13. Developing and Enhancing Workforce Training Programs: Number of Projects by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S H I E LGeothermalEnergy Aa newState |

  14. Developing and Enhancing Workforce Training Programs: Number of Projects by

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy | Departmentthe SantaofThe Energy Policy andDian

  15. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  16. Multispecies weighted Hurwitz numbers

    E-Print Network [OSTI]

    Harnad, J

    2015-01-01T23:59:59.000Z

    The construction of hypergeometric 2D Toda $\\tau$-functions as generating functions for weighted Hurwitz numbers is extended to multispecies families. Both the enumerative geometrical significance of multispecies weighted Hurwitz numbers as weighted enumerations of branched coverings of the Riemann sphere and their combinatorial significance in terms of weighted paths in the Cayley graph of $S_n$ are derived. The particular case of multispecies quantum weighted Hurwitz numbers is studied in detail.

  17. Curvature and Tachibana numbers

    SciTech Connect (OSTI)

    Stepanov, Sergey E [Finance Academy under the Government of the Russian Federation, Moscow (Russian Federation)

    2011-07-31T23:59:59.000Z

    The aim of this paper is to define the rth Tachibana number t{sub r} of an n-dimensional compact oriented Riemannian manifold as the dimension of the space of conformally Killing r-forms, for r=1,2,...,n-1. We also describe properties of these numbers, by analogy with properties of the Betti numbers b{sub r} of a compact oriented Riemannian manifold. Bibliography: 25 titles.

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  19. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  20. ERIS Project

    E-Print Network [OSTI]

    Hunter, Philip

    repositories. If these (generally) smaller institutions wished to continue to have access to these hosted repository spaces after the end of the project, it was proposed that these repository-lite services would be administered by the SDLC (the Scottish Digital...

  1. Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity

    E-Print Network [OSTI]

    California at Davis, University of

    agencies are heavily involved in not only planning and forecasting, and budgeting and financing, but alsoProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End

  2. Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate

    E-Print Network [OSTI]

    California at Davis, University of

    Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

  3. Definitions Numbered Space

    E-Print Network [OSTI]

    Behmer, Spencer T.

    Definitions · Numbered Space ­ a single space marked with a number and reserved for a single permit 24/7 · Unnumbered Space ­ a space which can be used by any customer allowed to park in that lot. High Low Average Question 4: If I buy a staff permit for an UNNUMBERED* space in a non-gated surface

  4. Advances in Dynamical Systems and Applications ISSN 0973-5321, Volume x, Number x, pp. 113 (20xx)

    E-Print Network [OSTI]

    Muldoon, Martin E.

    supported by NPST Program of King Saud University, project number 10-MAT1293-02, the DSFP program of King

  5. 'ETALE WILD KERNELS OF EXCEPTIONAL NUMBER FIELDS KEVIN HUTCHINSON

    E-Print Network [OSTI]

    'ETALE WILD KERNELS OF EXCEPTIONAL NUMBER FIELDS KEVIN HUTCHINSON Abstract.We clarify the relationship between higher 'etale wild kernels * *of a number- cyclotomic tower of the field. We also determine the relationship betwee* *n the 'etale wild kernel

  6. Volume 29, Number 8 "April 13, 1983

    E-Print Network [OSTI]

    Farrell, Anthony P.

    . Peters received the award for his work in the area If hydrometallurgical leaching systems. I ":m projects. Prof. Peters will be studying the ! xucture of mineralsto determine what * chemical never get 100 tr cent extraction, as there are always ; .le components that remain nleachable'. sap Prof

  7. Parameter Estimation from an Optimal Projection in a Local Environment

    E-Print Network [OSTI]

    A. Bijaoui; A. Recio-Blanco; P. de Laverny

    2008-11-03T23:59:59.000Z

    The parameter fit from a model grid is limited by our capability to reduce the number of models, taking into account the number of parameters and the non linear variation of the models with the parameters. The Local MultiLinear Regression (LMLR) algorithms allow one to fit linearly the data in a local environment. The MATISSE algorithm, developed in the context of the estimation of stellar parameters from the Gaia RVS spectra, is connected to this class of estimators. A two-steps procedure was introduced. A raw parameter estimation is first done in order to localize the parameter environment. The parameters are then estimated by projection on specific vectors computed for an optimal estimation. The MATISSE method is compared to the estimation using the objective analysis. In this framework, the kernel choice plays an important role. The environment needed for the parameter estimation can result from it. The determination of a first parameter set can be also avoided for this analysis. These procedures based on a local projection can be fruitfully applied to non linear parameter estimation if the number of data sets to be fitted is greater than the number of models.

  8. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01T23:59:59.000Z

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  9. USF System USF USFSP USFSM Number: 0-314

    E-Print Network [OSTI]

    Meyers, Steven D.

    OF POLICY A. All proposals for fixed-price sponsored projects must be processed using USF System policies and procedures for sponsored projects administration. #12;B. Deficits or cost overruns on fixed-price sponsoredPOLICY USF System USF USFSP USFSM Number: 0-314 Subject: Financial Closeout of Fixed-price

  10. Hualapai Wind Project Feasibility Report

    SciTech Connect (OSTI)

    Davidson, Kevin [Hualapai Tribe] [Hualapai Tribe; Randall, Mark [Daystar Consulting] [Daystar Consulting; Isham, Tom [Power Engineers] [Power Engineers; Horna, Marion J [MJH Power Consulting LLC] [MJH Power Consulting LLC; Koronkiewicz, T [SWCA Environmental, Inc.] [SWCA Environmental, Inc.; Simon, Rich [V-Bar, LLC] [V-Bar, LLC; Matthew, Rojas [Squire Sanders Dempsey] [Squire Sanders Dempsey; MacCourt, Doug C. [Ater Wynne, LLP] [Ater Wynne, LLP; Burpo, Rob [First American Financial Advisors, Inc.] [First American Financial Advisors, Inc.

    2012-12-20T23:59:59.000Z

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  11. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER N1!PA...

    Broader source: Energy.gov (indexed) [DOE]

    PA PROJECT TITLE: Design and Implementation of Geothermal Energy Systems at West Chester University Funding Opportunity Announcement Number 70.10 Procurement Instrument Number...

  12. Moisture Metrics Project

    SciTech Connect (OSTI)

    Schuchmann, Mark

    2011-08-31T23:59:59.000Z

    the goal of this project was to determine the optimum moisture levels for biomass processing for pellets commercially, by correlating data taken from numerous points in the process, and across several different feedstock materials produced and harvested using a variety of different management practices. This was to be done by correlating energy consumption and material through put rates with the moisture content of incoming biomass ( corn & wheat stubble, native grasses, weeds, & grass straws), and the quality of the final pellet product.This project disseminated the data through a public website, and answering questions form universities across Missouri that are engaged in biomass conversion technologies. Student interns from a local university were employed to help collect data, which enabled them to learn firsthand about biomass processing.

  13. PROJECT SUMMARY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT SUMMARY 1

  14. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  15. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENA creates

  16. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagement

  17. Projects | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  18. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report: HPC-Colony IIProject Gnome

  19. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject FinalFluids |Storage Research and

  20. Project Paper mySAP Portals

    E-Print Network [OSTI]

    1 Project Paper mySAP Portals: Concept - Architecture - Technology Submitted by: Rahila Zahir Matriculation Number: 17321 14.06.2002 Supervised by: Prof. Dr. Florian Matthes Software Technology Systems Introduction to SAP Portals..................................................................18 3.1 SAP User

  1. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description include anything that...

  2. Kalispel Resident Fish Project : Annual Report, 1995.

    SciTech Connect (OSTI)

    Maroney, Joseph; Donley, Christopher; Scott, Jason; Lockwood, Jr., Neil

    1997-06-01T23:59:59.000Z

    In 1995 the Kalispel Natural Resource Department (KNRD) in conjunction with the Washington Department of Fish and Wildlife (WDFW) initiated the implementation of a habitat and population enhancement project for bull trout (Salvelinus confluentus), westslope cutthroat trout (Oncorhynchus clarki lewisi) and largemouth bass (Micropterus salmoides). Habitat and population assessments were conducted in seven tributaries of the Box Canyon reach of the Pend Oreille River. Assessments were used to determine the types and quality of habitat that were limiting to native bull trout and cutthroat trout populations. Assessments were also used to determine the effects of interspecific competition within these streams. A bull trout and brook trout (Salvelinus fontinalis) hybridization assessment was conducted to determine the degree of hybridization between these two species. Analysis of the habitat data indicated high rates of sediment and lack of wintering habitat. The factors that contribute to these conditions have the greatest impact on habitat quality for the tributaries of concern. Population data suggested that brook trout have less stringent habitat requirements; therefore, they have the potential to outcompete the native salmonids in areas of lower quality habitat. No hybrids were found among the samples, which is most likely attributable to the limited number of bull trout. Data collected from these assessments were compiled to develop recommendations for enhancement measures. Recommendations for restoration include riparian planting and fencing, instream structures, as well as, removal of non-native brook trout to reduce interspecific competition with native salmonids in an isolated reach of Cee Cee Ah Creek.

  3. Report number codes

    SciTech Connect (OSTI)

    Nelson, R.N. (ed.)

    1985-05-01T23:59:59.000Z

    This publication lists all report number codes processed by the Office of Scientific and Technical Information. The report codes are substantially based on the American National Standards Institute, Standard Technical Report Number (STRN)-Format and Creation Z39.23-1983. The Standard Technical Report Number (STRN) provides one of the primary methods of identifying a specific technical report. The STRN consists of two parts: The report code and the sequential number. The report code identifies the issuing organization, a specific program, or a type of document. The sequential number, which is assigned in sequence by each report issuing entity, is not included in this publication. Part I of this compilation is alphabetized by report codes followed by issuing installations. Part II lists the issuing organization followed by the assigned report code(s). In both Parts I and II, the names of issuing organizations appear for the most part in the form used at the time the reports were issued. However, for some of the more prolific installations which have had name changes, all entries have been merged under the current name.

  4. Geologic Carbon Dioxide Storage Field Projects Supported by DOE...

    Office of Environmental Management (EM)

    United States and other countries including, Canada, Algeria, Norway, Australia, and Germany. The program has also been supporting a number of complementary R&D projects...

  5. Mid-Atlantic Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  6. action research project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    And Risks is the interim report for the Smart Grid Information Assurance and Security Technology Assessment project (Contract Number 50008027 411 Public Interest Energy...

  7. applied research project: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    And Risks is the interim report for the Smart Grid Information Assurance and Security Technology Assessment project (Contract Number 50008027 436 Public Interest Energy...

  8. action project weldon: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a number of potentially contaminated areas, including seven unlined lagoons where 3 Action Learning Project Company Application Environmental Management and Restoration...

  9. US DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINAT...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Security SEP ARRA EE000164 PROJECT TITLE: SEP Residential Ground Source Heat Pump Installations (6 ) Page I of2 STATE: MN Funding Opportunity Announcement Number...

  10. CX-100164 Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    NREL Bangladesh Wind Resources Assessment Project: NREL Tracking No. 14-020 Award Number: DE-AC36-08GO28308 CX(s) Applied: A9, B3.1 Date: 09/11/2014 Location(s): Colorado Office(s): Golden Field Office

  11. CX-100050: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Truckee Carson Irrigation District Hydro Project CX(s) Applied: B1.13, B4.12, B5.24 Date: 09/08/2014 Location(s): Nevada Offices(s): Golden Field Office Technology Office: Fuel Cell Technologies Award Number: DE-EE000084

  12. CX-100089 Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    SLH-100 demonstration project at Monroe Drop Award Number: DE-EE0005420 CX(s) Applied: A9, B4.12, B5.15 Date: 8/7/2014 Location(s): Oregon Office(s): Golden Field Office

  13. Ceramic Technology Project

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  14. Potl,,]) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Broader source: Energy.gov (indexed) [DOE]

    ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: North Carolina State University- North Carolina Solar Center PROJECT TITLE: Southem Mid-Atlantic Provider of...

  15. U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    ." ,., U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:TRAVIS COUNTY TEXAS PROJECT TITLE: County of Travis, Texas 700 Lavaca Street...

  16. RECIPIENT:Crystal Solar U.S. DEPARTMENT OF ENERGY EERE PROJECT...

    Broader source: Energy.gov (indexed) [DOE]

    Crystal Solar U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Page I of3 STATE: CA PROJECT TITLE : Technology development for high efficiency solar...

  17. u.s. DEPARThIl!NT OF ENERGY EERE PROJECT MANAG EMENT CENTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DETERMINATION RECIPIENT: Northwest Energy Innovations Page 1 of3 STATE: OR PROJECT TITLE: WAVE ENERGY TECHNOLOGY-NEW ZEALAND MULTI-MODE WAVE ENERGY CONVERTER ADVANCEMENT PROJECT...

  18. ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION

    Broader source: Energy.gov (indexed) [DOE]

    or similar equipment. No new road construction is proposed as patt of the project. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR Patt...

  19. CX-003624: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Replacement of twenty 22-L structures on the Satsop-Aberdeen Number 2 230-kilovolt (kV) transmission line. The project work would involve removal of the existing towers and...

  20. Categorical Exclusion (CX) Determination Proposed Action: Expansion...

    Broader source: Energy.gov (indexed) [DOE]

    yard to accommodate an additional bay for a dedicated electrical feed to a future oil pumping station that will be part of the Keystone XL project. Number and Title of Categorical...

  1. U.S. DEPARTJ\\ofENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Broader source: Energy.gov (indexed) [DOE]

    VALLEY COMMUNITY COLLEGE STATE: NY PROJECT TITLE: Northeast Provider of Solar Photovoltaic Instructor Training Funding Opportunity Announcement Number Procurement Instrument...

  2. A number of organizations,

    E-Print Network [OSTI]

    installed solar electric systems on a number of the city's buildings, including the Chicago Center for Green Technology shown here. CityofChicago Aggregated Purchasing--A Clean Energy Strategy SOLAR TODAY Aggregated Purchasing--A Clean Energy Strategy by Lori A. Bird and Edward A. Holt #12;November/December 2002 35 Power

  3. ALARA notes, Number 8

    SciTech Connect (OSTI)

    Khan, T.A.; Baum, J.W.; Beckman, M.C. [eds.] [eds.

    1993-10-01T23:59:59.000Z

    This document contains information dealing with the lessons learned from the experience of nuclear plants. In this issue the authors tried to avoid the `tyranny` of numbers and concentrated on the main lessons learned. Topics include: filtration devices for air pollution abatement, crack repair and inspection, and remote handling equipment.

  4. Compendium of Experimental Cetane Number Data

    SciTech Connect (OSTI)

    Murphy, M. J.; Taylor, J. D.; McCormick, R. L.

    2004-09-01T23:59:59.000Z

    In this report, we present a compilation of reported cetane numbers for pure chemical compounds. The compiled database contains cetane values for 299 pure compounds, including 156 hydrocarbons and 143 oxygenates. Cetane number is a relative ranking of fuels based on the amount of time between fuel injection and ignition. The cetane number is typically measured either in a combustion bomb or in a single-cylinder research engine. This report includes cetane values from several different measurement techniques - each of which has associated uncertainties. Additionally, many of the reported values are determined by measuring blending cetane numbers, which introduces significant error. In many cases, the measurement technique is not reported nor is there any discussion about the purity of the compounds. Nonetheless, the data in this report represent the best pure compound cetane number values available from the literature as of August 2004.

  5. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    SciTech Connect (OSTI)

    J. T. Beck

    2007-04-26T23:59:59.000Z

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities.

  6. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  7. KPA Activity Number

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetter Report: I11IG002RTC3 |JulianProject Phase 12009

  8. Livingston Solar Canopy Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    ,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

  9. Information Visualization Graduate Project (Group Project)

    E-Print Network [OSTI]

    Rusu, Adrian

    Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

  10. Chapter 4, Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol: The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,0009.1_Acquisition_of_Information_Resources_0.pdf4.6 Assigning Identifying Numbers4:

  11. Docket Number: 12-AFC-02 Project Title: Huntington Beach Energy Project

    E-Print Network [OSTI]

    ...........................................................................................................4.10-1 Transmission Line Safety and Nuisance employees, contractors and subcontractors make no warrant, express or implied, and assume no legal liability Siting, Transmission and Environmental Protection Division ROBERT P. OGLESBY Executive Director #12;i

  12. Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance

    E-Print Network [OSTI]

    ................................................................................................ 4.10-1 Transmission Line Safety and Nuisance no legal liability for the information in this report; nor does any part represent that the uses Manager MATT LAYTON Engineering Office Manager ROGER E. JOHNSON Deputy Director Siting, Transmission

  13. Docket Number: 09-AFC-06C Project Title: Blythe Solar Power Project -Compliance

    E-Print Network [OSTI]

    ................................................................................................ 4.10-1 Transmission Line Safety and Nuisance make no warrant, express or implied, and assume no legal liability for the information in this report Office Manager ROGER E. JOHNSON Deputy Director Siting, Transmission and Environmental Protection

  14. Docket Number: 09-AFC-06C Project Title: Blythe Solar Power Project -Compliance

    E-Print Network [OSTI]

    ................................................................................................ 4.10-1 Transmission Line Safety and Nuisance or implied, and assume no legal liability for the information in this report; nor does any part represent ROGER E. JOHNSON Deputy Director Siting, Transmission and Environmental Protection Division ROBERT P

  15. Docket Number: 12-AFC-03 Project Title: Redondo Beach Energy Project

    E-Print Network [OSTI]

    Redondo Beach Generating Station currently has four operating steam generating units (Units 5, 6, 7, and 8 composed of three natural gas combustion turbine generators (CTG), three supplemental-fired heat recovery steam generators (HRSG), a steam turbine generator (STG), an air-cooled condenser, and ancillary

  16. Docket Number: 09-AFC-06C Project Title: Blythe Solar Power Project -Compliance

    E-Print Network [OSTI]

    Materials Management 16.Waste Management 17.Biological Resources 18.Soil and Water Resources 19.Cultural Resources 20.Geology and Paleontology 21.Land Use 22.Traffic and Transportation 23.Socioeconomics (including Environmental Justice and Growth Inducing Impacts) 24.Noise and Vibration 25.Visual Resources 26.Overrides

  17. Federal Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03T23:59:59.000Z

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Superseded by DOE G 413.3-19 Admin Chg 1.

  18. Puerto Rico`s EcoElectrica LNG/power project marks a project financing first

    SciTech Connect (OSTI)

    Lammers, R. [Enron International, Houston, TX (United States); Taylor, S. [Kenetech Energy Systems Inc., Houston, TX (United States)

    1998-02-23T23:59:59.000Z

    On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a number of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.

  19. NSR Key Number Retrieval

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparency VisitSilver Toyota PriusNSR Key Number Retrieval Pease

  20. CaPS Application Form -2012 CAPITAL PROJECTS AND SPACE ALLOCATION COMMITTEE (CAPS)

    E-Print Network [OSTI]

    Toronto, University of

    No B TOTAL PROJECT COST ESTIMATE / OPERATING COSTS TOTAL PROJECT COST (TPC) $ Project Number: Requested project tendered at a cost exceeding the above pre-design estimate will not proceed unless the partyCaPS Application Form - 2012 CAPITAL PROJECTS AND SPACE ALLOCATION COMMITTEE (CAPS) APPLICATION

  1. EERE PROJECT MA.NAGEMENT CENTER NEPA DFTFIU.1INATION PROJECT

    Broader source: Energy.gov (indexed) [DOE]

    NEPA DFTFIU.1INATION PROJECT TITLE: EECBG DE-EEOOOO727 Atchison Library Ground Source Heat Pump Page 1 of2 STATE : KS Funding Opportunity Announcement Number Procurement Instrument...

  2. An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

    2004-06-01T23:59:59.000Z

    This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

  3. CX-010811: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-010811: Categorical Exclusion Determination South Louisiana Enhanced Oil Recovery (EOR)Sequestration Research and Development (R&D) Project CX(s) Applied: A1, A9, A11 Date:...

  4. CX-002307: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-002307: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant -City of Lincoln, 12- Renewable Energy Project Subgrants CX(s) Applied: A9, A11, B5.1...

  5. CX-003218: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Renewable Energy and Energy Efficiency Revolving Loan Program RO Ranch Hydro Project CX(s) Applied: B1.15, B4.11, B5.1 Date: 08022010 Location(s): Nye County,...

  6. CX-004190: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination American Recovery and Reinvestment Act Projects at National Solar Thermal Test Facility CX(s) Applied: B1.15, B1.16, B3.6, B3.11 Date: 07092010...

  7. CX-006213: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Categorical Exclusion Determination Recovery Act: Conducting a 3D Converted Shear Wave Project to Reduce Exploration Risk at Wister, California CX(s) Applied: A9, B3.1, B3.7...

  8. CX-003764: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Categorical Exclusion Determination Ohio Advanced Transportation Project- Ace Taxi Propane AutoGas Fueling Station CX(s) Applied: B5.1 Date: 09172010 Location(s): Cleveland,...

  9. CX-008551: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination 1366 Project Silicon: Reclaiming US Silicon Photovoltaic Leadership CX(s) Applied: A9, B1.31, B3.6, B5.1 Date: 06212012 Location(s):...

  10. CX-006822: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-006822: Categorical Exclusion Determination Project 1803 - Install New Groundwater Pumping Well in Internal Revenue Service North Parking Lot CX(s) Applied: B3.1, B6.1 Date:...

  11. CX-001574: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-001574: Categorical Exclusion Determination North Village Ground Source Heat Pump Project CX(s) Applied: A9, B5.1 Date: 03292010 Location(s): South Carolina...

  12. CX-006022: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Oregon State University Cascades Campus Ground Source Heat Pump Project CX(s) Applied: B5.1 Date: 05262011 Location(s): Oregon Office(s): Energy...

  13. CX-003413: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Energy Efficiency and Conservation Block GrantTown of Drummond Wind Turbine Project Beyond State Template CX(s) Applied: A9, B3.6, B5.1 Date: 08172010...

  14. CX-002814: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-002814: Categorical Exclusion Determination City of Arcola 40 Kilowatt Wind Turbine Project CX(s) Applied: B5.1 Date: 06232010 Location(s): Arcola, Illinois Office(s):...

  15. CX-006169: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-006169: Categorical Exclusion Determination United Way Energy Efficient Buildings Project for Non-Profit Facilities CX(s) Applied: B2.5, B5.1 Date: 07132011...

  16. Grant Application Package CFDA Number

    E-Print Network [OSTI]

    Talley, Lynne D.

    Grant Application Package CFDA Number: Opportunity Title: Offering Agency: Agency Contact: Opportunity Open Date: Opportunity Close Date: CFDA Description: Opportunity Number: Competition ID

  17. Ribosomal Database Project II

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Ribosomal Database Project (RDP) provides ribosome related data and services to the scientific community, including online data analysis and aligned and annotated Bacterial small-subunit 16S rRNA sequences. As of March 2008, RDP Release 10 is available and currently (August 2009) contains 1,074,075 aligned 16S rRNA sequences. Data that can be downloaded include zipped GenBank and FASTA alignment files, a histogram (in Excel) of the number of RDP sequences spanning each base position, data in the Functional Gene Pipeline Repository, and various user submitted data. The RDP-II website also provides numerous analysis tools.[From the RDP-II home page at http://rdp.cme.msu.edu/index.jsp

  18. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Hydroelectric Power Project impacts Improve natural salmonid habitat and production #12;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from livestockRest from livestock;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from

  19. Grant Title: KNOWLEDGE DISSEMINATION CONFERENCE GRANTS PROGRAM ANNOUNCEMENT Funding Opportunity Number: CFDA Number(s) -93.243; Funding Opportunity Number -OA-08-002.

    E-Print Network [OSTI]

    Farritor, Shane

    Number: CFDA Number(s) - 93.243; Funding Opportunity Number - OA-08-002. Agency/Department: Department

  20. DSO - the Danish DA project

    SciTech Connect (OSTI)

    Rahbek, T.; Jorgensen, H.J.; Jacobsen, E.; Nielsen, T.G.

    1994-12-31T23:59:59.000Z

    This paper describes a Danish distribution automation project. The objective of the project is to determine the utilities` needs five years from now and then to define the requirements these needs will put to the utilities equipment, methods and systems. The paper reports on the results we have achieved until now and will deal with these subjects: (1) Systems structure with a three layer information model; (2) Systems operation with three operational modes, i.e. normal mode, passive fault mode and active fault mode; (3) Four standard types of transformer stations including a standard layout for an advanced transformer station; and (4) A new compact, low cost, optical MV current sensor.

  1. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination of Project Costs Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  2. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power Administration CX(s) Applied:...

  3. U.S. Department of Energy NEPA Categorical Exclusion Determination...

    Broader source: Energy.gov (indexed) [DOE]

    Project Description 1) The Federated Indians of Graton Rancheria will complete an energy audit at the tribal offices to determine energy efficient retrofits; 2) community...

  4. THE ADVANCED CHEMISTRY BASINS PROJECT

    SciTech Connect (OSTI)

    William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

    2004-04-05T23:59:59.000Z

    In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical phase equilibrium, and physical flow through porous media. The chemical kinetic scheme includes thermal indicators including vitrinite, sterane ratios, hopane ratios, and diamonoids; and a user-modifiable reaction network for primary and secondary maturation. Also provided is a database of type-specific kerogen maturation schemes. The phase equilibrium scheme includes modules for primary and secondary migration, multi-phase equilibrium (flash) calculations, and viscosity predictions.

  5. Lac Courte Oreilles Energy Analysis Project

    SciTech Connect (OSTI)

    Leslie Isham; Denise Johnson

    2009-04-01T23:59:59.000Z

    The Lac Courte Oreilles Tribe applied for first step funding in 2007 and was awarded in October of that year. We wanted to perform an audit to begin fulfilling two commitments we made to our membership and resolutions that we adopted. One was the Kyoto Protocol and reduce our carbon emissions by 25% and to produce 25% of our energy by sustainable means. To complete these goals we needed to begin with first assessing what our carbon emissions are and begin taking the steps to conserve on the energy we currently use. The First Step Grant gave us the opportunity to do this. Upon funding the Energy Project was formed under the umbrella of the LCO Public Works Department and Denise Johnson was hired as the coordinator. She quickly began fulfilling the objectives of the project. Denise began by contact the LCO College and hiring interns who were able to go to each Tribal entity and perform line logging to read and document the energy used for each electrical appliance. Data was also gathered for one full year from each entity for all their utility bills (gasoline, electric, natural gas, fuel oil, etc.). Relationships were formed with the Green Team and other Green Committees in the area that could assist us in this undertaking. The Energy Task Force was of great assistance as well recommending other committees and guidance to completing our project. The data was gathered, compiled and placed into spreadsheets that would be understandable for anyone who didn't have a background in Renewable Resources. While gathering the data Denise was also looking for ways to conserve energy usage, policies changes to implement and any possible viable renewable energy resources. Changes in the social behaviors of our members and employees will require further education by workshops, energy fairs, etc.. This will be looked into and done in coordination with our schools. The renewable resources seem most feasible are wind resources as well as Bio Mass both of which need further assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

  6. Projects | Department of Energy

    Office of Environmental Management (EM)

    Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

  7. CRSP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expenses of the project each year, and receive all of the energy it produces. Salt Lake City AreaIntegrated Projects: Power from the Colorado River Storage Project plants was...

  8. Project Selection - Record Keeping

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

  9. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a projects infrastructure, limited to 5% of the net general revenues during the...

  10. Voluntary Protection Program Onsite Review, Soil and Groundwater Remediation Project- March 2007

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Soil and Groundwater Remediation Project is performing at a level deserving DOE-VPP recognition.

  11. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  12. Project BETA Cover Page

    E-Print Network [OSTI]

    Cover Page, Project BETA

    2012-01-01T23:59:59.000Z

    and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

  13. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  14. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  15. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  16. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  17. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  19. Microphonics control for Project X

    SciTech Connect (OSTI)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01T23:59:59.000Z

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  20. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15T23:59:59.000Z

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

  1. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    SciTech Connect (OSTI)

    Reed, M.J. (ed.)

    1993-03-01T23:59:59.000Z

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  2. U.S. DEPARThiENT OF ENERGY EERE PROJECT MA~AGE:\\-1E~T ...

    Broader source: Energy.gov (indexed) [DOE]

    RECIPIENT:Wisconsin Department of Administration STATE: WI PROJECT TITLE : Wisconsin Biodiesel Blending Program Funding Opportunity Announcement Number Procurement Instrument...

  3. Performance Metrics Research Project - Final Report

    SciTech Connect (OSTI)

    Deru, M.; Torcellini, P.

    2005-10-01T23:59:59.000Z

    NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

  4. The concrete theory of numbers: initial numbers and wonderful properties of numbers repunit

    E-Print Network [OSTI]

    Boris V. Tarasov

    2007-04-07T23:59:59.000Z

    In this work initial numbers and repunit numbers have been studied. All numbers have been considered in a decimal notation. The problem of simplicity of initial numbers has been studied. Interesting properties of numbers repunit are proved: $gcd(R_a, R_b) = R_{gcd(a,b)}$; $R_{ab}/(R_aR_b)$ is an integer only if $gcd(a,b) = 1$, where $a\\geq1$, $b\\geq1$ are integers. Dividers of numbers repunit, are researched by a degree of prime number.

  5. Manhattan Project | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan Project Manhattan Project Manhattan Project New Manhattan Project Interactive Website The Department of Energy traces its origins to World War II and the Manhattan...

  6. Categorical Exclusion Determination Form

    Broader source: Energy.gov (indexed) [DOE]

    Sile Office Project Tjtle- Radio Freque ncy (RF) Measurements at EMRTC, Socorro, New Mexico l .ocal jon Sandia National Laboratories New Mexico proposed Act jon or Project P...

  7. ARE Update Volume 13, Number 2

    E-Print Network [OSTI]

    Lin, C.-Y. Cynthia; Zhang, Wei; Prince, Lea; Sexton, Steven E; Carter, Colin A.; Janzen, Joseph

    2009-01-01T23:59:59.000Z

    demand. Retail gasoline price projections are from the we used projections of California gasoline price, CaliforniaFigure 4. Projections Using the High Price Scenario and

  8. Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid

    E-Print Network [OSTI]

    California at Davis, University of

    Project Information Form Project Title Advanced Energy Management Strategy Development for Plug management strategy, which determines how energy flows in a hybrid powertrain should be managed in response for PHEVs using connected vehicle technology. Different energy management strategies will be developed

  9. MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives

    E-Print Network [OSTI]

    MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives vessel registries to conduct recreational catch and effort surveys. Develop a recreational fishing. Accuracy Funded 2012 Oregon Shore and EstuaryBoat Survey Design Review Develop a new or revised

  10. MemphiSTEP: A STEM Talent Expansion Program at the University of Memphis Project Goals

    E-Print Network [OSTI]

    Hagen, Thomas

    implements the following core strategies designed to increase graduation rates. Project Data 1. Impact on Graduation Numbers at the U of M For the 5 main years of the project (2008-09 through 2012-13), the number of students graduating in STEM from the U of M closely aligned with the projected benchmarks. Table 1 shows

  11. CX-100019: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Determination of Rare Earths in Geothermal Brines and Evaluation of Potential Extraction Techniques CX(s) Applied: A9, B3.1, B3.6 Date: 08/18/2014 Location(s): California Offices(s): Golden Field Office Technology Office: Geothermal Technologies Award Number: DE-EE0006750

  12. Data Compression with Prime Numbers

    E-Print Network [OSTI]

    Gordon Chalmers

    2005-11-16T23:59:59.000Z

    A compression algorithm is presented that uses the set of prime numbers. Sequences of numbers are correlated with the prime numbers, and labeled with the integers. The algorithm can be iterated on data sets, generating factors of doubles on the compression.

  13. New Mexico State University Arrowhead Center PROSPER Project

    SciTech Connect (OSTI)

    Peach, James

    2012-12-31T23:59:59.000Z

    This document is the final technical report of the Arrowhead Center Prosper Project at New Mexico State University. The Prosper Project was a research and public policy initiative funded by the National Energy Technology Laboratory (NETL) of the U.S. Department of Energy (DOE). The Prosper project (DOE Grant Number DE-NT0004397) began on October 1, 2008 (FY2009, Quarter 1) and ended on December 31, 2012 (FY2013, Quarter 1). All project milestones were completed on time and within the budget. This report contains a summary of ten technical reports resulting from research conducted during the project. This report also contains a detailed description of the research dissemination and outreach activities of the project including a description of the policy impacts of the project. The report also describes project activities that will be maintained after the end of the project.

  14. Senior projectS corporate Sponsored

    E-Print Network [OSTI]

    Stuart, Josh

    --Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

  15. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  16. AVTA: ARRA EV Project Overview

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following document describes the context of the EV Project, which partnered with city, regional and state governments, utilities, and other organizations in 16 cities to deploy about 14,000 Level 2 PEV chargers and 300 DC fast chargers. It also deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. This research was conducted by Idaho National Laboratory.

  17. The Uniform Methods Project: Methods for Determining Energy Efficiency...

    Broader source: Energy.gov (indexed) [DOE]

    on how OE provides unbiased policy assistance and analysis to States and regions on State electricity policies, programs, laws, and regulations that facilitate electricity...

  18. GY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT...

    Broader source: Energy.gov (indexed) [DOE]

    A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such...

  19. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION

    Broader source: Energy.gov (indexed) [DOE]

    InformatIOn gathering (including. but not limited to, literature surveys, inventories, site visits. and audits). data analysis (including, but not limited 10, oomputer...

  20. T OF ENERGY EER E PROJECT MANAGEMENT CENTER NEPA DETERMINATION

    Broader source: Energy.gov (indexed) [DOE]

    A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such...

  1. PROJECT GOALS To determine whether any ANU properties provide

    E-Print Network [OSTI]

    and likely outcomes for carbon sequestration planting. Analysis of land tenure, legal and environmental conditions relating to potential carbon sequestration sites. Two sites identified as providing meaningful opportunities for carbon sequestration. These two sites could potentially capture enough carbon to offset

  2. RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....

    Broader source: Energy.gov (indexed) [DOE]

    labor, materials and equipment required to locate, excavate, and inspect an internal corrosion anomaly at two locations on the WH to SUN Terminal 42-inch crude oil pipeline....

  3. RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....

    Broader source: Energy.gov (indexed) [DOE]

    85 Title: Install Temperature Monitoring on BH 36 inch Crude Oil Pipeline Description: Subcontractor shall shall provide all labor, materials, tools, equipment, and supervision...

  4. RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....

    Broader source: Energy.gov (indexed) [DOE]

    318 Title: WH Air ConditioningHeating Repairs, 2010-2013 Description: Subcontractor shall provide all labor, materials, tools, equipment, transportation and supervision required...

  5. RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No....

    Broader source: Energy.gov (indexed) [DOE]

    620 Title: BC Replacement Vacuum Truck Description: Subcontractor shall provide a new 3,000 gallon vacuum truck to replace the existing BC vacuum truck, BCVT1. Regulatory...

  6. Uniform Methods Project for Determining Energy Efficiency Program Savings |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sureReportsofDepartmentSeries | DepartmentResources Program |»Department of

  7. Uniform Methods Project: Determining Energy Efficiency Savings for Specific

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sureReportsofDepartmentSeries | DepartmentResources Program |»Department

  8. The Uniform Methods Project: Methods for Determining Energy Efficiency

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy SolarRadioactive LiquidSavings for Specific Measures (April

  9. Determining Baseline and Avoided Costs for UESC Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T A * S H I E LGeothermal * August 2004

  10. The Uniform Methods Project: Methods for Determining Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMayDepartmentTest for PumpingThe Facts onDepartmentThe Sun and

  11. The Uniform Methods Project: Methods for Determining Energy Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideoStrategic|Industrial Sector, JanuarySunShotDepartment of Energy

  12. 7-55E An office that is being cooled adequately by a 12,000 Btu/h window air-conditioner is converted to a computer room. The number of additional air-conditioners that need to be installed is to be determined.

    E-Print Network [OSTI]

    Bahrami, Majid

    7-20 7-55E An office that is being cooled adequately by a 12,000 Btu/h window air-conditioner is converted to a computer room. The number of additional air-conditioners that need to be installed/h. Then noting that each available air conditioner provides 4,000 Btu/h cooling, the number of air- conditioners

  13. CX-003611: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08252010 Location(s): King...

  14. CX-010439: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05302013 Location(s): Washington, Washington...

  15. FutureGen Project Report

    SciTech Connect (OSTI)

    Cabe, Jim; Elliott, Mike

    2010-09-30T23:59:59.000Z

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: Site evaluation and selection process and environmental characterization Underground Injection Control (UIC) Permit Application including well design and subsurface modeling FutureGen IGCC-CCS Design Basis Document Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report Process flow diagrams and heat/material balance for slurry-fed gasifier configuration Process flow diagrams and heat/material balance for dry-fed gasifier configuration Full capital cost report and cost category analysis (CAPEX) Full operating cost report and assumptions (OPEX) Comparative technology evaluations, value engineering exercises, and initial air permitting activities are also provided; the report concludes with schedule, risk, and cost mitigation activities as well as lessons learned such that the products of this report can be used to support future investments in utility scale gasification and carbon capture and sequestration. Collectively, the FutureGen project enabled the comprehensive site specific evaluation and determination of the economic viability of IGCC-CCS. The project report is bound at that determination when DOE formally proposed the FutureGen 2.0 project which focuses on repowering a pulverized coal power plant with oxy-combustion technology including CCS.

  16. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    SciTech Connect (OSTI)

    CLEVELAND, K.J.

    2000-08-17T23:59:59.000Z

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

  17. Compendium of Experimental Cetane Numbers

    SciTech Connect (OSTI)

    Yanowitz, J.; Ratcliff, M. A.; McCormick, R. L.; Taylor, J. D.; Murphy, M. J.

    2014-08-01T23:59:59.000Z

    This report is an updated version of the 2004 Compendium of Experimental Cetane Number Data and presents a compilation of measured cetane numbers for pure chemical compounds. It includes all available single compound cetane number data found in the scientific literature up until March 2014 as well as a number of unpublished values, most measured over the past decade at the National Renewable Energy Laboratory. This Compendium contains cetane values for 389 pure compounds, including 189 hydrocarbons and 201 oxygenates. More than 250 individual measurements are new to this version of the Compendium. For many compounds, numerous measurements are included, often collected by different researchers using different methods. Cetane number is a relative ranking of a fuel's autoignition characteristics for use in compression ignition engines; it is based on the amount of time between fuel injection and ignition, also known as ignition delay. The cetane number is typically measured either in a single-cylinder engine or a constant volume combustion chamber. Values in the previous Compendium derived from octane numbers have been removed, and replaced with a brief analysis of the correlation between cetane numbers and octane numbers. The discussion on the accuracy and precision of the most commonly used methods for measuring cetane has been expanded and the data has been annotated extensively to provide additional information that will help the reader judge the relative reliability of individual results.

  18. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

  19. The 4-H Project

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

  20. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  1. SAPHIRE 8 Software Project Plan

    SciTech Connect (OSTI)

    Curtis L.Smith; Ted S. Wood

    2010-03-01T23:59:59.000Z

    This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: Incorporation of SPAR models for the SDP interface. Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. Continue the current activities for code maintenance, documentation, and user support for the code.

  2. GHPsRUS Project

    SciTech Connect (OSTI)

    Battocletti, Liz

    2013-07-09T23:59:59.000Z

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  3. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  4. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please emailWeatherizationInnovation@ee.doe.gov.

  5. Bacteria TMDL Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  6. DEPARTMENT OFENFRGY EERE PROJECT MANAGEMENT CENTER NEPA DETEIU...

    Broader source: Energy.gov (indexed) [DOE]

    this determination due to the nature of the action, which is to increase the number of Smart Meter installations compared to the number originally tasked. The no-cost aspect...

  7. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21T23:59:59.000Z

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  8. NAVFAC Ocean Thermal Energy Conversion (OTEC) Project

    E-Print Network [OSTI]

    NAVFAC Ocean Thermal Energy Conversion (OTEC) Project Contract Number N62583-09-C-0083 CDRL A014 OTEC Mini-Spar Pilot Plant 9 December 2011 OTEC-2011-001-4 Prepared for: Naval Facilities; distribution is unlimited. #12; Configuration Report and Development Plan Volume 4 Site Specific OTEC

  9. Number

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthN V O 1 8 7 +New York, New

  10. Product Guide Project Standard and Project Professional

    E-Print Network [OSTI]

    Narasayya, Vivek

    ................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

  11. Brookhaven National Laboratory Number: Revision

    E-Print Network [OSTI]

    Ohta, Shigemi

    Brookhaven National Laboratory Number: Revision: PS-ESH-0057 01 Effective: Page 1 of 9 06 Chris Weilandics Signature on file Department ES&H Approval printed name Signature Date Lori Stiegler Signature on file #12;Number: PS-ESH-0057 Revision: 01 Effective: 06/08/12 Page 2 of 9 The only official

  12. Suncatcher monitoring project

    SciTech Connect (OSTI)

    Maeda, B.

    1980-01-01T23:59:59.000Z

    An intensive microcomputer-based energy monitoring project was conducted on a passively heated and cooled residence in Davis, California. The building performance was estimated in the design phase by both a simplified method and an hourly simulation. In the monitoring phase, more than 75 sensors, located in the building elements, interior spaces, appliances, and the ambient environment provide data about temperatures, energy use and radiation. These data are used to determine the actual solar system contributions, and to validate and improve design calculation tools. Information was gathered on the Suncatcher system for almost three years. Daily min/max temperatures inside and outside of the house and utility use have been reduced and analyzed. From these data we calculate the monthly net heating load and the percentage of that met by solar energy. To date, it has averaged 71%. Hourly data, gathered by the custom-made data acquisition system, show how daily temperature and radiation patterns change. Natural cooling supplied 100% of the cooling need. During the hot summers typical of the Davis area, the house has remained very comfortable virtually all of the time, except for two or three afternoons each summer, where temperatures reached a stuffy 83 or 84F. The other solar energy source, the solar hot water system, has provided 50 to 60% of the hot water needed by the residents, who use less domestic hot water than average.

  13. Building America Special Research Project: High-R Walls Case...

    Office of Environmental Management (EM)

    High-R Walls Case Study Analysis Building America Special Research Project: High-R Walls Case Study Analysis This report considers a number of promising wall systems with improved...

  14. Public Interest Energy Research (PIER) Program INTERIM PROJECT REPORT

    E-Print Network [OSTI]

    for the Smart Grid Information Assurance and Security Technology Assessment project (Contract Number 50008027 Generation · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable Energy Technologies

  15. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Developing5002013109 Prepared for: California Energy Commission Prepared by: Growpro Inc #12; Prepared by Waimauku, New Zealand Contract Number: PIR-07-001 Prepared for: California Energy Commission Abolghasem

  16. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary.lbl.gov Contract Number: 500-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager

  17. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl...

    Broader source: Energy.gov (indexed) [DOE]

    Page I of2 STATE: CA PROJECT TITLE: The Diablo Regional Distributed Solar Energy Generation Expedited Permit Process Funding Opportunity Announcement Number Procurement...

  18. U.S. DEPARTIVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    CENTER NEPA DETERlVIINATION RECIPIENT:County of Fairfax STATE: VA PROJECT Electric and hybrid vehicle incremental cost recovery TITLE: Funding Opportunity Announcement Number...

  19. U.S. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    DETER.lVIINATION Page I of2 RECIPIENT:Pennsylvania State University STATE: PA PROJECT TITLE : Scattering Solar Thermal Concentrators Funding Opportunity Announcement Number...

  20. us. DEP.-\\RThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy, Labor & Economic Growth PROJECT TITLE: SEP ARRA - Michigan Slate University. BioEnergy Page 1 of2 STATE: MI Funding Opportunity Announcement Number...

  1. u.s. DEPARTI\\IIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Broader source: Energy.gov (indexed) [DOE]

    NEPADETERlVIINATION RECIPIENT:Texas Stale Energy Office PROJECT TITLf. : Seadrift Woo Turbine Page 1 of3 STATE: TX Funding Opportunity Announcement Number Procurement Instrument...

  2. U.S. DEPARTMENT OF I!NI!RGY EERE PROJECT MANAGEMENT CENTER NFPA...

    Broader source: Energy.gov (indexed) [DOE]

    the Iowa Office of Energy STATE: IA Independence) PROJECf TITLE: Magellan Des Moines Biodiesel Terminal Project Page 10f3 Funding Opportunity Announcement Number Procurement...

  3. Development of Direct-Use Projects: Preprint

    SciTech Connect (OSTI)

    Lund, J.

    2011-01-01T23:59:59.000Z

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  4. Radiation safety at the West Valley Demonstration Project

    SciTech Connect (OSTI)

    Hoffman, R.L.

    1997-05-06T23:59:59.000Z

    This is a report on the Radiation Safety Program at the West Valley Demonstration Project (WVDP). This Program covers a number of activities that support high-level waste solidification, stabilization of facilities, and decontamination and decommissioning activities at the Project. The conduct of the Program provides confidence that all occupational radiation exposures received during operational tasks at the Project are within limits, standards, and program requirements, and are as low as reasonably achievable.

  5. Fundamentals of a Third-Party Cogeneration Project

    E-Print Network [OSTI]

    Grantham, F.; Stovall, D.

    ----------------- FUNDAMENTALS OF A THIRD-PARTY COGENERATION PROJECT Frank. Grantham and Darrell Stovall Time Energy Systems, Inc., Houston, Texas ABSTRACT There is an increasing number of 2-10 ~W cogeneration projects involving retrofits... at institutional and industrial installations. This type of project requires that the cogeneration equipment be (al designed and sized to match the electrical and thermal usage of the facility and (b) retrofitted or integrated physically with the facility...

  6. iDeKalb Housing information Project executive summary

    E-Print Network [OSTI]

    Kostic, Milivoje M.

    iDeKalb Housing information Project executive summary In the spring of 2012, the City of DeKalb, launched a project to develop a comprehensive housing database and related analytical and reporting tools is a housing database with information describing the available housing stock (i.e., number, size, geographic

  7. Master of Science project in computational material physics

    E-Print Network [OSTI]

    Hellsing, Bo

    Master of Science project in computational material physics (2013-12-05) Two-band Hubbard model of these materials. The temperature, pressure and doping driven transitions between a vast number of phases, e Gutzwiller method with the GPAW-DFT code in order to take into account the local correlations. Project

  8. Secretary's annual report to Congress. Volume III. Project summaries

    SciTech Connect (OSTI)

    None

    1981-01-01T23:59:59.000Z

    Progress and status of representative projects in each program within DOE are summarized. Subjects covered and the number of projects reported on are: conservation (2); fossil energy (11); nuclear energy (5); renewable energy resources (16); energy production and power marketing (3); general science (11); defense programs (7); contingency planning (3); and management and oversight (1). (MCW)

  9. `Save Our Squirrels' (SOS) A Red Alert North England Project

    E-Print Network [OSTI]

    `Save Our Squirrels' (SOS) A Red Alert North England Project objectives The red squirrel is Britain in England. Action is needed if numbers are to be stabilised. The `Save Our Squirrels' Project (SOS) was set targeted area works with partners and woodland owners to fight to save the red squirrel. We

  10. Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

    E-Print Network [OSTI]

    for Industrial Process Heat using High- Temperature Parabolic Trough Solar Collectors project (Contract Number of a project to demonstrate the use of solar collectors that produce high temperature process heat GENERATION USING PARABOLIC TROUGH SOLAR COLLECTION NOVEMBER 2010 CEC5002011040 Prepared for: California

  11. Milliken Clean Coal Demonstration Project: A DOE Assessment

    SciTech Connect (OSTI)

    National Energy Technology Laboratory

    2001-08-15T23:59:59.000Z

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  12. LLW Notes supplement, Volume 12, Number 2

    SciTech Connect (OSTI)

    NONE

    1997-02-01T23:59:59.000Z

    Federal criteria for determining whether a project presents an environmental justice concern are currently subject to multiple interpretations. There are no federal statutes or regulations that specifically reference or address environmental justice, and the guidelines that are being developed by the Council on Environmental Quality are currently in draft form. The lack of consistent and clear federal criteria for determining what constitutes an environmental justice impact--and how to determine whether environmental justice issues have been effectively addressed--can create a dilemma for state agencies that wish to include--or have already included--environmental justice, along with legal, economic and technical issues, as a consideration when siting a facility. The following information is therefore provided for those agencies and commissions seeking to site, to license, to construct and to operate a low-level radioactive waste disposal facility. Topics include: National Environmental Justice Advisory Council; NEJAC members; Federal definitions of environmental justice; and EPA`s role in federal land transfers. Federal agencies can achieve environmental justice by identifying and addressing--as appropriate--disproportionately high and adverse human health or environmental effects of [federal agency] programs, policies, and activities on minority populations and low-income populations.

  13. Moab Project Logs 2 Million Work Hours Without Lost-Time Injury...

    Office of Environmental Management (EM)

    number 1,584 may not mean much to most people, but for the workers on EM's Moab Uranium Mill Tailings Remedial Action Project, it represents the number of days without a...

  14. Departmental Business Instrument Numbering System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-12-05T23:59:59.000Z

    To prescribe procedures for assigning identifying numbers to all Department of Energy (DOE), including the National Nuclear Security Administration, business instruments. Cancels DOE 1331.2B. Canceled by DOE O 540.1A.

  15. Departmental Business Instrument Numbering System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-27T23:59:59.000Z

    The Order prescribes the procedures for assigning identifying numbers to all Department of Energy (DOE) and National Nuclear Security Administration (NNSA) business instruments. Cancels DOE O 540.1. Canceled by DOE O 540.1B.

  16. The Jacobi-Stirling Numbers

    E-Print Network [OSTI]

    Andrews, George E; Gawronski, Wolfgang; Littlejohn, Lance L

    2011-01-01T23:59:59.000Z

    The Jacobi-Stirling numbers were discovered as a result of a problem involving the spectral theory of powers of the classical second-order Jacobi differential expression. Specifically, these numbers are the coefficients of integral composite powers of the Jacobi expression in Lagrangian symmetric form. Quite remarkably, they share many properties with the classical Stirling numbers of the second kind which, as shown in LW, are the coefficients of integral powers of the Laguerre differential expression. In this paper, we establish several properties of the Jacobi-Stirling numbers and its companions including combinatorial interpretations thereby extending and supplementing known contributions to the literature of Andrews-Littlejohn, Andrews-Gawronski-Littlejohn, Egge, Gelineau-Zeng, and Mongelli.

  17. Project title: Global environmental change: biomineral proxies of ocean chemistry and climate

    E-Print Network [OSTI]

    2009-07-10T23:59:59.000Z

    #8; FINAL PROJECT REPORT Please remember to provide CMI with electronic copies of any outputs that you have generated. This might include papers, presentations, patents, course material, attendance lists, website addresses, etc. Project... CMI Project Review: Project Name Global Environmental Change: Biomineral Proxies of Ocean Chemistry and Climate Number 003/P Report Period 22 June 2001- 30 April 2004 Project Name Cambridge PI, affiliation Harry Elderfield (Earth...

  18. Green River Formation water flood demonstration project. Final report

    SciTech Connect (OSTI)

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. [Inland Resources, Inc. (United States); [Lomax Exploration Co., Salt Lake City, UT (United States); Deo, M.D. [Utah Univ., Salt Lake City, UT (United States). Dept. of Chemical and Fuels Engineering

    1996-11-01T23:59:59.000Z

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  19. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  20. Scientific Drilling, Number 1, 2005 Scientific ocean drilling started in the early 1960s with

    E-Print Network [OSTI]

    Demouchy, Sylvie

    Scientific Drilling, Number 1, 2005 Scientific ocean drilling started in the early 1960s, or the Moho). This project, known as Mohole, was succeeded by the Deep Sea Drilling Project, the International Phase of Ocean Drilling, the Ocean Drilling Program, and the current Integrated Ocean Drilling Program

  1. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31T23:59:59.000Z

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ? Create a Showcase Waste Heat Recovery Demonstration Project.

  2. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  3. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  4. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

  5. Project: BELLA Bldg. #: 71

    E-Print Network [OSTI]

    TO CONSTRUCTION AS OF 10/4/2011 Current/Approved Projects Project: Solar Energy Research Center Bldg. #:TBD. #: TBD Affected Area: R1 Road & V Road (58) Dates: 8/2011 - 9/2013 6 Small Projects: A. B50 Electrical/1/2014 N3 (58) 42 11/1/2011 2/1/2014 M-1 (35) 12 10/1/2010 11/1/2011 B81 (21) 18 10/1/2010 11/1/2011 V Road

  6. Crystal face temperature determination means

    DOE Patents [OSTI]

    Nason, D.O.; Burger, A.

    1994-11-22T23:59:59.000Z

    An optically transparent furnace having a detection apparatus with a pedestal enclosed in an evacuated ampule for growing a crystal thereon is disclosed. Temperature differential is provided by a source heater, a base heater and a cold finger such that material migrates from a polycrystalline source material to grow the crystal. A quartz halogen lamp projects a collimated beam onto the crystal and a reflected beam is analyzed by a double monochromator and photomultiplier detection spectrometer and the detected peak position in the reflected energy spectrum of the reflected beam is interpreted to determine surface temperature of the crystal. 3 figs.

  7. Project Information Form Project Title Structural Determinants of Electric Vehicle Market Growth

    E-Print Network [OSTI]

    California at Davis, University of

    of Electric Vehicle Market Growth University UC Davis Principal Investigator---in electric vehicle (PEV) markets are facing and how they are likely to evolve approach to the assessment of factors that affect the market development

  8. u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    lAIA1) u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPINT:Arizona Geological Survey PROJECT TITLE: Siale Geological Survey Contributions to the...

  9. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  10. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  11. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  12. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  13. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  14. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  15. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  16. Project Finance Case Studies

    Broader source: Energy.gov [DOE]

    Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  17. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  18. TThe {\\sc Majorana} Project

    E-Print Network [OSTI]

    The MAJORANA collaboration

    2009-10-23T23:59:59.000Z

    The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  19. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  20. Energy Markets and Projections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Governors Association Governors' Advisors Energy Policy Institute July 24, 2014 | Washington, DC By Adam Sieminski, EIA Administrator Energy Markets and Projections NGA...

  1. Our Project Regional, community,

    E-Print Network [OSTI]

    Minnesota, University of

    City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

  2. Barstow Wind Turbine Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  3. Prison Solar Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  4. EA-1935: ToHajiilee Solar Project

    Broader source: Energy.gov [DOE]

    DOE has determined that providing federal funding to conduct development activities including final engineering and design for a proposed 30 megawatt solar electricity generation facility, would not constitute a major federal action significantly affecting the environment, and therefore, DOE has adopted the EA, titled Final Environmental Assessment for the ToHajiilee Solar Project (DOI SWCA project No. 16715) that was completed by the Department of the Interior Bureau of Indian Affairs (BIA) which analyzed the environmental impacts related to the construction, operation and maintenance of a 30-megawatt solar power plant. A Finding of No Significant Impact (FONSI) was issued on May 31, 2011 by the BIA for the solar project. The solar project would be located on tribal lands 2.5 miles northwest of the intersection of Interstate 40 and Rio Puerco Road about 20 miles west of Albuquerque, New Mexico.

  5. Projecting Electricity Demand in 2050

    SciTech Connect (OSTI)

    Hostick, Donna J.; Belzer, David B.; Hadley, Stanton W.; Markel, Tony; Marnay, Chris; Kintner-Meyer, Michael CW

    2014-07-01T23:59:59.000Z

    This paper describes the development of end-use electricity projections and load curves that were developed for the Renewable Electricity (RE) Futures Study (hereafter RE Futures), which explored the prospect of higher percentages (30% ? 90%) of total electricity generation that could be supplied by renewable sources in the United States. As input to RE Futures, two projections of electricity demand were produced representing reasonable upper and lower bounds of electricity demand out to 2050. The electric sector models used in RE Futures required underlying load profiles, so RE Futures also produced load profile data in two formats: 8760 hourly data for the year 2050 for the GridView model, and in 2-year increments for 17 time slices as input to the Regional Energy Deployment System (ReEDS) model. The process for developing demand projections and load profiles involved three steps: discussion regarding the scenario approach and general assumptions, literature reviews to determine readily available data, and development of the demand curves and load profiles.

  6. Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida

    SciTech Connect (OSTI)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.; Walker, Brian K., Ph.D.; Reed, John K., Ph.D.

    2012-02-28T23:59:59.000Z

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts of marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight about seabed conditions offshore southeastern Florida by conducting a geophysical survey of pre-selected areas with subsequent post-processing and expert data interpretation by geophysicists and experienced marine biologists knowledgeable about the general project area. The second step sought to validate the benthic habitat types interpreted from the geophysical data by conducting benthic video and photographic field surveys of selected habitat types. The goal of this step was to determine the degree of correlation between the habitat types interpreted from the geophysical data and what actually exists on the seafloor based on the benthic video survey logs. This step included spot-checking selected habitat types rather than comprehensive evaluation of the entire area covered by the geophysical survey. It is important to note that non-invasive survey methods were used as part of this study and no devices of any kind were either temporarily or permanently attached to the seabed as part of the work conducted under this project.

  7. IMPACT OF CAPILLARY AND BOND NUMBERS ON RELATIVE PERMEABILITY

    SciTech Connect (OSTI)

    Kishore K. Mohanty

    2002-09-30T23:59:59.000Z

    Recovery and recovery rate of oil, gas and condensates depend crucially on their relative permeability. Relative permeability in turn depends on the pore structure, wettability and flooding conditions, which can be represented by a set of dimensionless groups including capillary and bond numbers. The effect of flooding conditions on drainage relative permeabilities is not well understood and is the overall goal of this project. This project has three specific objectives: to improve the centrifuge relative permeability method, to measure capillary and bond number effects experimentally, and to develop a pore network model for multiphase flows. A centrifuge has been built that can accommodate high pressure core holders and x-ray saturation monitoring. The centrifuge core holders can operate at a pore pressure of 6.9 MPa (1000 psi) and an overburden pressure of 17 MPa (2500 psi). The effect of capillary number on residual saturation and relative permeability in drainage flow has been measured. A pore network model has been developed to study the effect of capillary numbers and viscosity ratio on drainage relative permeability. Capillary and Reynolds number dependence of gas-condensate flow has been studied during well testing. A method has been developed to estimate relative permeability parameters from gas-condensate well test data.

  8. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  9. W-320 Project thermal modeling

    SciTech Connect (OSTI)

    Sathyanarayana, K., Fluor Daniel Hanford

    1997-03-18T23:59:59.000Z

    This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

  10. Environmental impact assessment of the Dulang oilfield development project

    SciTech Connect (OSTI)

    Hasan, M.N. (U. Kebangsaan Malaysia (MY)); (Ismail, M.Y. (Petronas Cangali Sdn. Bhd. (MY)))

    1988-01-01T23:59:59.000Z

    The authors discuss an environmental impact assessment (EIA) of the Dulang Oilfield Development Project, conducted to determine whether the project could proceed in a safe and environmentally acceptable manner. This is the first EIA for an offshore oilfield in Malaysian waters, and was conducted in anticipation of the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment Order(1987)) which requires an EIA to be conducted for major oil and gas field development projects.

  11. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    SciTech Connect (OSTI)

    Elmer, John; Butherus, Michael [S.M. Stoller Corporation (United States)] [S.M. Stoller Corporation (United States); Barr, Deborah L. [U.S. Department of Energy Office of Legacy Management (United States)] [U.S. Department of Energy Office of Legacy Management (United States)

    2013-07-01T23:59:59.000Z

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

  12. Report/Product Number(s) DOE/ER/64701 DOE Award/Contract Number(s)

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem Not Found Item Not Foundenhancer activity than FINAL Report/Product Number(s)

  13. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15T23:59:59.000Z

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  14. Bacteria TMDL Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of TMDL projects for water bodies where swimming or wading may be unsafe or harvesting of oysters is limited or prohibited due to high concentrations of bacteria. ? Atascosa River: A TMDL Project for Bacteria ? Buffalo andWhite Oak Bayous: A TMDL...

  15. EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project

    Broader source: Energy.gov [DOE]

    This EISassesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides...

  16. Categorical Exclusion Determination Form

    Broader source: Energy.gov (indexed) [DOE]

    carbon dioxide (C02), and concentrated solar energy to cost-effectively produce Syngas, a renewable, carbon-neutral fuel. Project activities will include: (1) modeling,...

  17. Categorical Exclusion Determination Form

    Broader source: Energy.gov (indexed) [DOE]

    of Technology - Thermal Fuel: HybriSol Hybrid Nanostructure for High-Energy- Density Solar Thermal Fuels Program or Field Office:Advanced Research Projects Agency - Energy...

  18. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect (OSTI)

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01T23:59:59.000Z

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  19. Preliminary assessment of potential CDM early start projects in Brazil

    SciTech Connect (OSTI)

    Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

    2000-11-01T23:59:59.000Z

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest rate and with substantial guarantee. A few of the projects might go ahead without the benefit of CERs, but most probably would not. Whether the projected revenue from CERs would be sufficient to induce sponsors to proceed with the projects is an important issue that requires further investigation. All of the projects contribute to economic development in Brazil. The forestry projects in particular would create a significant number of rural jobs, and contribute income to rural communities. Some of the carbon sequestration projects would provide environmental benefits with respect to protection of biodiversity and soil.

  20. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    NONE

    2007-06-15T23:59:59.000Z

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  1. On Normal Numbers Veronica Becher

    E-Print Network [OSTI]

    Figueira, Santiago

    ends with all zeros; hence, q is not simply normal to base b. 3/23 #12;The problem is still open Theorem (Borel 1909) Almost all real numbers are absolutely normal. Problem (Borel 1909) Give an example transducers. Huffman 1959 calls them lossless compressors. A direct proof of the above theorem Becher

  2. Brookhaven National Laboratory Number: Revision

    E-Print Network [OSTI]

    Ohta, Shigemi

    NATIONAL LABORATORY LASER CONTROLLED AREA STANDARD OPERATING PROCEDURE (SOP) This document defines OPERATIONS Operation Maintenance Service Specific Operation (specify) #12;Number: PS-ESH-0083 Revision: 01 the safety management program for the laser system(s) listed below. All American National Standard Institute

  3. Classification and grading of design products for the Yucca Mountain project

    SciTech Connect (OSTI)

    DeKlever, R.C.; Bullock, R.L. [Raytheon Services Nevada, Las Vegas (United States); Verna, B.J. [Department of Energy, Washington, DC (United States)

    1993-12-01T23:59:59.000Z

    The US Department of Energy faces some unique challenges in its site characterization effort to determine if Yucca Mountain is suitable to house this nation`s first high-level radioactive waste repository. Facilities are being designed and constructed for both surface-based testing (SBT), which includes drilling a number of test holes and excavating trenches and test pits into the mountain, and the Exploratory Studies Facility (ESF), which will be an extensive underground test laboratory. During construction and testing, the Yucca Mountain Project (YMP) must ensure that the ability to safely store waste for 10,000 yr is not compromised. The YMP has initiated a determination of {open_quotes}important to waste isolation{close_quotes} (ITWI) effort to determine which items and activities are important to the gathering of valid test data and which could have an effect on the natural barriers. Concerns include the potential effects of changing the site`s normal water patterns, introducing foreign materials, damaging the unexcavated rock, etc. The project has now entered into the phase in which the design organizations perform detailed QA classification analyses on their designs and a YMP assessment team reviews those analyses. Raytheon Services Nevada has been responsible for designing, classifying, and grading SBT and the initial ESF systems.

  4. Coastal Ohio Wind Project

    SciTech Connect (OSTI)

    Gorsevski, Peter; Afjeh, Abdollah; Jamali, Mohsin; Bingman, Verner

    2014-04-04T23:59:59.000Z

    The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directi

  5. IT Project Management Practices Guide Page 1 of 83 ASU, HSC, TTU, TTUS IT Project Management Practices Guide

    E-Print Network [OSTI]

    Rock, Chris

    . Application of Project Management ­ distinguishes what types of work should and should not be categorized of Project Management Types of Work The Guide should be used for the management of Information Technology management methodologies outlined within the Guide. Upcoming/potential work should be analyzed to determine

  6. Detroit Commuter Hydrogen Project

    SciTech Connect (OSTI)

    Brooks, Jerry; Prebo, Brendan

    2010-07-31T23:59:59.000Z

    This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

  7. Voluntary Protection Program Onsite Review, Waste Treatment Plant Construction Project- June 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Waste Treatment Plant Construction Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  8. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- November 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  9. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- June 2008

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  10. Voluntary Protection Program Onsite Review, Plutonium Finishing Plant Closure Project- May 2007

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Plutonium Finishing Plant Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  11. u.s. DEPARTl'vIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER

    Broader source: Energy.gov (indexed) [DOE]

    OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT: Pennsylvania State University PROJECI TITLE : Northem MidAtlantic Provider of Solar Instructor Training...

  12. U.S. DEP_UUMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA...

    Broader source: Energy.gov (indexed) [DOE]

    DEPUUMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:University of Central Florida PROJECf TITLE: PV Manufacturing Consortium Page 1 of2 STATE: Fl...

  13. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  14. Automated Data Verification in a Large-scale Citizen Science Project: a Case Study

    E-Print Network [OSTI]

    Wong, Weng-Keen

    Automated Data Verification in a Large-scale Citizen Science Project: a Case Study Jun Yu1 , Steve,jag73}@cornell.edu Abstract-- Although citizen science projects can engage a very large number with eBird, which is a broad-scale citizen science project to collect bird observations, has shown

  15. www.arts.canterbury.ac.nz/internships Project Title: Fracking in Canterbury?

    E-Print Network [OSTI]

    Hickman, Mark

    www.arts.canterbury.ac.nz/internships Project Title: Fracking in Canterbury? Bachelor of Arts: Joanna Goven Project Reference Number: S212/Fracking/22/NP Application Deadline: 2 July NOON Project Description: Fracking is the term given to the hydraulic fracturing of rock to extract natural gas

  16. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  17. LIMB demonstration project extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21T23:59:59.000Z

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  18. NEPA COMPLIANCE SURVEY Project Information Project Title: Casing...

    Broader source: Energy.gov (indexed) [DOE]

    Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description nclude The...

  19. Kellogg and Russ Forest projects. 2002 Project sand highlights

    E-Print Network [OSTI]

    Kellogg and Russ Forest projects. 2002 Project sand highlights MacCready Reserve a new property of insects Galeerucella calmariensis,and G.pusilla to control purple loosestrife on May 13. #12;New Project

  20. NEPA COMPLIANCE SURVEY Project Information Project Title: South...

    Broader source: Energy.gov (indexed) [DOE]

    Facility 2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional...

  1. Demonstration project in Energy Management Programs

    SciTech Connect (OSTI)

    Not Available

    1989-05-01T23:59:59.000Z

    The Energy Management Plan of the campuses developed under this project showed that there were a number of low-cost Energy Conservation Opportunities (ECO's) with a payback of under one year, (Short term Opportunities, STO). There were also other ECO's identified that had paybacks of more than one year. By combining these ECO's into one contract with the ESCO and paying for the costs of the ECO's by the savings resulting in the reduced energy bills, the University enhanced it's ability to carry out its mission of providing higher educational opportunities without spending money on non-educational activities. The low cost projects subsidize'' or provide leverage for the capital intensive, longer payback projects, to make an overall package that lends itself to innovative financing. JC Smith's contract also guarantees that the annual energy levels will not be increased.

  2. AVTA: ARRA EV Project Vehicle Placement Maps

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following maps describe where the EV Project deployed 5,700 all-electric Nissan Leafs and 2,600 plug-in hybrid electric Chevrolet Volts. Background data on how this data was collected is in the EV Project: About the Reports. This research was conducted by Idaho National Laboratory.

  3. Twelve Steps to Successful Energy Project Management

    E-Print Network [OSTI]

    Smith, W. P.

    COORDINATOR PRODUCTION EMPLOYEES MANUFACTURING SUPERVISOR 'HAS( I I.,.... ..Ion llIfjtct ,_{tionl INITIAlJOH 2.Prajol ROll 4. p,number of techniques can be used to develop energy project ideas. First, everyone must know the energy program is a plant-wide effort and an important part...

  4. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-01-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit [number sign]1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  5. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-10-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit {number_sign}1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  6. Optimal Choice for Number of Strands in a Litz-Wire Transformer Winding

    E-Print Network [OSTI]

    Optimal Choice for Number of Strands in a Litz-Wire Transformer Winding C. R. Sullivan Found Choice for Number of Strands in a Litz-Wire Transformer Winding Charles R. Sullivan Thayer School/inductor Abstract -- The number of strands to minimize loss in a litz-wire transformer winding is determined

  7. Ceramic Technology for Advanced Heat Engines Project

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    The Ceramic Technology For Advanced Heat Engines Project was developed by the Department of Energy's Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Advanced Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the Department of Energy (DOE), National Aeronautics and Space Administration (NASA), and Department of Defense (DOD) advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. However, these programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. An assessment of needs was completed, and a five year project plan was developed with extensive input from private industry. The objective of the project is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on structural ceramics for advanced gas turbine and diesel engines, ceramic hearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines.

  8. What is the Federal Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-01-01T23:59:59.000Z

    The Federal Demonstration Project is a cooperative effort between a number of universities, a private research institute, and several federal agencies to increase research productivity by eliminating unnecessary administrative procedures and by streamlining and standardizing needed controls. The Project aims to locate responsibility for decision-making as close as possible to principal investigators while maintaining necessary institutional and agency oversight to ensure accountability. By freeing researchers from some of their paperwork burden, more efficient research administration systems will enable investigators to spend more of their time doing science and engineering. The Federal Demonstration Project is an outgrowth of an earlier activity sponsored by five major federal R D agencies at the Florida State University System and the University of Miami. In Florida, the focus was on standardizing and streamlining procedures for administering research grants after the grants had been awarded to the universities. (See Attachment 1 for descriptions of the demonstrations carried out under the Florida Demonstration Project). In May 1988, the most successful of the demonstrated procedures were approved by the US Office of Management and Budget for use in grants awarded by any federal agency to any research organization. The new procedures give agencies authority to waive requirements that grantees obtain federal approval prior to taking a number of administrative actions with respect to grant management. The FDP institutions together with the participating federal agencies are designing and demonstrating innovative research administration procedures and are assessing the impact of those new procedures.

  9. UM ID NUMBER RSMAS General

    E-Print Network [OSTI]

    Miami, University of

    ROSENSTIEL SCHOOL OF MARINE & ATMOSPHERIC SCIENCE (RSMAS) 2013-2014 VEHICLE REGISTRATION & PARKING PERMIT and agrees to abide by it. In exchange for parking privileges and permission to operate a motor vehicle any vehicle parked in violation of its parking regulations to be towed to a place determined

  10. Flash Steam Recovery Project

    E-Print Network [OSTI]

    Bronhold, C. J.

    2000-01-01T23:59:59.000Z

    /condensate recovery system, resulting in condensate flash steam losses to the atmosphere. Using computer simulation models and pinch analysis techniques, the Operational Excellence Group (Six Sigma) was able to identify a project to recover the flash steam losses as a...

  11. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  12. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  13. Financing energy efficiency projects

    SciTech Connect (OSTI)

    Hansen, S.J.; Weisman, J.C. [Hansen Associates (United States)

    1999-07-01T23:59:59.000Z

    Getting an energy project financed should be a shared effort between the ESCO and the customer, but the perspectives are different. It is the ESCO`s responsibility to put together a bankable project. The ESCO typically arranges the financing. Its reputation and history often add surety, which offers financiers added confidence. The customer usually incurs the debt and needs to know the financing options available. This article first addresses what constitutes a bankable project from the ESCO perspective. Then, the types of financing available to owners are explored. ESCOs, who have been in this business for a few years, remember knocking on the financial doors until their knuckles were bloody. Today, the financiers knock on the ESCO doors...if, and it`s a big IF, ESCOs can put together bankable projects.

  14. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 94% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  15. Contract/Project Management

    Energy Savers [EERE]

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 98% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  16. Contract/Project Management

    Office of Environmental Management (EM)

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 100% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  17. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EVM Systems: Post CD-3, (greater than 20 million). 95%* 96% EVM represents Earned Value Management. Certified FPD's at CD-1: Projects have certified FPDs no later than CD-1....

  18. IT Project Manager

    Broader source: Energy.gov [DOE]

    This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

  19. Healthcare Project Performance Benchmarks

    Broader source: Energy.gov [DOE]

    Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the healthcare industry, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

  20. Simulation Server Project 25

    E-Print Network [OSTI]

    1 Simulation Server for Project 25: Inter-RF Subsystem Interface (ISSI) September 30, 2011 Simulation Server v1.0.0 #12;2 1. Executive Overview..................................................................................................................... 5 3.1. Starting the Server

  1. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01T23:59:59.000Z

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  2. Contract/Project Management

    Office of Environmental Management (EM)

    Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and...

  3. St. Bernard Project Update

    Broader source: Energy.gov [DOE]

    The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

  4. Contract/Project Management

    Energy Savers [EERE]

    Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

  5. Contract/Project Management

    Energy Savers [EERE]

    in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

  6. RESEARCH PROJECTS February 13

    E-Print Network [OSTI]

    Schenato, Luca

    will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration systems for heating and cooling in Mediterranean climate PROJECT REFERENCE: 218895 CALL: FP7-ENERGY-2007

  7. Portsmouth Paducah Project Office

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the Portsmouth...

  8. Offshore Wind Project Map

    Broader source: Energy.gov [DOE]

    Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

  9. Y-12 Steam Plant Project Received National Recognition for Project...

    National Nuclear Security Administration (NNSA)

    Steam Plant Project Received National Recognition for Project Management Excellence | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  10. NNSA project receives DOE Secretary's Award for Project Management...

    National Nuclear Security Administration (NNSA)

    project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  11. Maine Natural Gas Number of Commercial Consumers (Number of Elements)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto China (Million Cubic Feet) 3 0 07,755,432Commercial Consumers (Number

  12. Minnesota Natural Gas Number of Commercial Consumers (Number of Elements)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto China (Million Cubic Feet)Commercial Consumers (Number of Elements)

  13. Minnesota Natural Gas Number of Industrial Consumers (Number of Elements)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto China (Million Cubic Feet)Commercial Consumers (Number of

  14. Kansas Natural Gas Number of Residential Consumers (Number of Elements)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688ElectricityLessAprilResidential Consumers (Number of

  15. Tennessee Natural Gas Number of Residential Consumers (Number of Elements)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5 Tables July 1996 Energy Information Administration Office ofthroughYear Jan FebDecadeDecade217523,552.1Residential Consumers (Number

  16. Wisconsin Natural Gas Number of Residential Consumers (Number of Elements)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5 Tables July 1996 Energy Information Administration Office ofthroughYear JanYearFuel5,266 6,090Industrial Consumers (Number

  17. Vermont Natural Gas Number of Commercial Consumers (Number of Elements)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 34 44Year Jan FebIncreasesCommercial Consumers (Number of Elements)

  18. Vermont Natural Gas Number of Industrial Consumers (Number of Elements)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 34 44Year Jan FebIncreasesCommercial Consumers (Number of

  19. Georgia Natural Gas Number of Industrial Consumers (Number of Elements)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.GasYear JanPriceIndustrial Consumers (Number of

  20. PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3

    SciTech Connect (OSTI)

    Layfield, K.A.

    1998-09-02T23:59:59.000Z

    The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

  1. A common visual metric for approximate number and density

    E-Print Network [OSTI]

    Kingdom, Frederick A. A.

    is largely determined by the number of objects, whereas low SF energy depends more on the area occupied, Canada H3A 1A1; d Applied Vision Research Centre, City University, London EC1V 0HB, United Kingdom; and e response of mechanisms tuned to low and high spatial frequencies (SFs), because energy at high SFs

  2. Quark number susceptibility of high temperature and finite density QCD

    E-Print Network [OSTI]

    Ari Hietanen; Kari Rummukainen

    2007-10-26T23:59:59.000Z

    We utilize lattice simulations of the dimensionally reduced effective field theory (EQCD) to determine the quark number susceptibility of QCD at high temperature ($T>2T_c$). We also use analytic continuation to obtain results at finite density. The results extrapolate well from known perturbative expansion (accurate in extremely high temperatures) to 4d lower temperature lattice data

  3. The Mississippi CCS Project

    SciTech Connect (OSTI)

    Doug Cathro

    2010-09-30T23:59:59.000Z

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  4. Black Pine Circle Project

    ScienceCinema (OSTI)

    Mytko, Christine

    2014-09-15T23:59:59.000Z

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  5. Baytown Energy Project

    E-Print Network [OSTI]

    Porter, J.

    2006-01-01T23:59:59.000Z

    which maximize the yield of saleable products. Distillation towers consume most of the energy required for aromatics separation. BEP reconfigured the existing towers in the product recovery section to a new fractionation scheme. The new... and toluene sidestream from the primary benzene recovery tower. The result was a 30% reduction in energy in the benzene/toluene fractionation area. The project also debottlenecked the toluene disproportionation unit by 20%. The project was completed...

  6. Black Pine Circle Project

    SciTech Connect (OSTI)

    Mytko, Christine

    2014-03-31T23:59:59.000Z

    A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

  7. BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)

    E-Print Network [OSTI]

    BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project (Beacon) Sponsor: Beacon Solar, LLC (Beacon Solar), a Delaware limited liability company and wholly owned and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County

  8. GREEN JOBS PROJECT Daniel Kammen

    E-Print Network [OSTI]

    Kammen, Daniel M.

    GREEN JOBS PROJECT Memo Daniel Kammen Meng Cai Karim El Alami December 2nd , 2014 #12;Contents.............................................................................................................................................3 1 Base of the Green jobs project per state ........................................................................................3 1.1 The Green jobs project from 2009

  9. ENLACE Mentor Project **.......................................................... Student Affairs

    E-Print Network [OSTI]

    de Lijser, Peter

    1 2 2 3 3 4 4 1 ENLACE Mentor Project .......................................................................... 5 #12;ENLACE Mentor Project Program Description: The ENLACE Mentor Project is designed to encourage employment opportunities, counseling, peer mentoring, faculty mentoring, academic and career advisement

  10. Projects of the year

    SciTech Connect (OSTI)

    Hansen, T.

    2007-01-15T23:59:59.000Z

    The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

  11. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    SciTech Connect (OSTI)

    None

    1980-12-01T23:59:59.000Z

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  12. Sustainable Places Project/Project Connect

    E-Print Network [OSTI]

    Spillar, R.; Arguello, J.

    2013-01-01T23:59:59.000Z

    Needs and Opportunities Project Details System: Corridors and Gaps System Optimization Funding Organization All answeredat the system level ESL-KT-13-12-50 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 14...1Presented to: Clean Air Trough Energy Efficiency CATEE Conference San Antonio December 18, 2013 ESL-KT-13-12-50 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 2 Capital Metro jurisdiction, and prior...

  13. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management Plan ExamplesProject

  14. Portsmouth/Paducah Project Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paducah Site Recovery Act project director. Recovery Act Projects East End Smelter - Recovery Act funding accelerated by 22 years the cleanup and demolition of a...

  15. Energy Efficient Electronics Cooling Project

    SciTech Connect (OSTI)

    Steve O'Shaughnessey; Tim Louvar; Mike Trumbower; Jessica Hunnicutt; Neil Myers

    2012-02-17T23:59:59.000Z

    Parker Precision Cooling Business Unit was awarded a Department of Energy grant (DE-EE0000412) to support the DOE-ITP goal of reducing industrial energy intensity and GHG emissions. The project proposed by Precision Cooling was to accelerate the development of a cooling technology for high heat generating electronics components. These components are specifically related to power electronics found in power drives focused on the inverter, converter and transformer modules. The proposed cooling system was expected to simultaneously remove heat from all three of the major modules listed above, while remaining dielectric under all operating conditions. Development of the cooling system to meet specific customer's requirements and constraints not only required a robust system design, but also new components to support long system functionality. Components requiring further development and testing during this project included pumps, fluid couplings, cold plates and condensers. All four of these major categories of components are required in every Precision Cooling system. Not only was design a key area of focus, but the process for manufacturing these components had to be determined and proven through the system development.

  16. National Ignition Facility project execution plan

    SciTech Connect (OSTI)

    Paisner, J., LLNL

    1997-08-01T23:59:59.000Z

    This project execution plan covers: Justification of Mission Need; Project Description; Management Roles and Responsibilities; Project Execution; Method of Accomplishment.

  17. Renewable Energy & Energy Efficiency Projects: Loan Guarantee...

    Energy Savers [EERE]

    Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Plenary III: Project Finance...

  18. UMTRA project list of reportable occurrences

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

  19. 1 October, 2012 PROJECT COMMISSIONING FOR SMALL PROJECTS

    E-Print Network [OSTI]

    Kamat, Vineet R.

    1 October, 2012 PROJECT COMMISSIONING FOR SMALL PROJECTS This procedure defines the process for performing construction-phase commissioning (Cx) on small projects, typically projects consisting of a single system with a few pieces of equipment. When the process is performed by an external commissioning firm

  20. Perspectives on Project Finance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Perspectives on Project Finance Perspectives on Project Finance Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern...