Powered by Deep Web Technologies
Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Hygiene Substation Access Road Repairs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hygiene Substation Access Road Repairs Hygiene Substation Access Road Repairs A. Brief Description of Proposal: Western Area Power Administration proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering oflarge maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, CO (T3N, R69W, Sec 18). All proposed construction will occur within the existing, disturbed substation access road/driveway. B. Number and Title of tile Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) BI.3 Routine maintenance activities and custodial services for buildings, structures,

2

Categorical Exclusion for Access Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Road Access Road Improvements along the Pinnacle Peak- Prescott 230-kV Transmission Line between Structures 16813 and 170/1 Yavapai County. Arizona * RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to improve access roads along a portion of the Pinnacle Peak to Prescott 230-kV Transmission Line (Structures 168/3 and 170/1). which are currently impassable. to maintain worker safety and the reliability of the bulk electric system. Western plans to blade and grade the existing access road where it enters and leaves three washes so that Western's maintenance vehicles can drive across the washes. We will remove dirt from the road prism by starting at wash edges and pulling dirt up slope in order to create ramps with grades suitable for our equipment.

3

Microsoft Word - CX-Ross-Lexington_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Darin Bowman Darin Bowman Project Manager - TELF-TPP-3 Proposed Action: Access road repair including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas. Budget Information: Work Order # 00259661 PP&A Project No.: 1738 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way, infrastructures (e.g.. roads)...routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is a Bonneville Power Administration (BPA) access road located on

4

Using Daylight to Light the Access Zone of Road Tunnels  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Daylight to Light the Access Zone of Road Tunnels Using Daylight to Light the Access Zone of Road Tunnels Speaker(s): Eliyahu Ne'eman Date: March 4, 2003 - 12:00pm Location: Bldg. 90 Lighting guides for roadway tunnels specify relatively high luminances for the "access zone" into the tunnel. They are needed to allow the eyes of the driver sufficient time to adapt during the short period of the transition from the outdoor natural daylight levels to the fairly low luminances along the main length of the tunnel. Usually, the necessary high luminances are provided by rows of costly luminaries which consume a lot of electricity during peak use periods and need a good deal of maintenance. To save some electric power, controls are used to dim the lighting on cloudy hours. Daylight has been used for the access zone in several tunnels around the

5

Microsoft Word - CX-Boyer-Tillamook_access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 David Forward TELF-TPP-3 Proposed Action: Boyer-Tillamook No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #00253279 PP&A Project No.: PP&A 1533 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for...rights-of-way...(e.g. roads)...required to maintain and preserve...infrastructures in a condition suitable for a facility to be used for its designated purpose. Location: Tillamook and Yamhill counties, Oregon. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action:

6

Microsoft Word - CX-Ostrander-Troutdale-access_road_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts Budget Information: Work Order #: Unavailable PP&A Project No.: PP&A #1740 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities for rights-of-way, infrastructures (e.g. roads) routine maintenance activities corrective are required to maintain and preserve infrastructures in a condition suitable for the facility to be used for its designed purpose. Location: The proposed project is located within the Bonneville Power Administration (BPA)

7

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

8

EA-0904: Access Road from State Route 240 to the 200 West Area Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Access Road from State Route 240 to the 200 West Area 4: Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington EA-0904: Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts of a proposal to construct an access road on the U.S. Department of Energy's Hanford Site in Richland, Washington, from State Route 240 to Beloit Avenue in the 200 West Area. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 10, 1994 EA-0904: Finding of No Significant Impact Access Road from State Route 240 to the 200 West Area Hanford Site, Richland, Washington March 10, 1994 EA-0904: Final Environmental Assessment Access Road from State Route 240 to the 200 West Area Hanford Site,

9

Microsoft Word - Class 1 S Access Road-031611 FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Permit Modification Notification to: * Add South Access Road for Transportation of TRU Mixed Waste We certify under penalty of law that this document and the enclosure were...

10

Best Management Practices (BMPs) Manual for Access Road Crossings of Wetlands and Waterbodies  

Science Conference Proceedings (OSTI)

This manual addresses the selection and use of best management practices (BMPs) for the construction and/or maintenance of wetland and waterbody crossings by access roads associated with electric utility lines. Although the focus of this manual is on electric utility access roads, the contents are likely to be applicable to a much broader range of linear projects, including other types of roads and projects.

2002-03-22T23:59:59.000Z

11

Microsoft Word - CX-Hillscreek-LookoutPoint_AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nick Wenzl Line Foreman I - TFE-Alvey Line Foreman III - TFE-Alvey Proposed Action: Wood pole replacement and minor access road maintenance along portions of the Hills...

12

Microsoft Word - CX-Ross-Lexington_access_road_addition_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-4 KEPR-4 SUBJECT: Environmental Clearance Memorandum Dawneen Dostert Project Manager - TERR-LMT Proposed Action: New access road construction to include clearing, grading, and shaping of roads, placing and compacting of rock surfacing, installation of gates, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas Budget Information: Work Order # 00230995 PP&A Project No.: 1534 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction/ acquisition/relocation of onsite pathways, short onsite access roads/railroads. Location: The project area is confined to the existing and proposed access roads around the right-of-way (ROW) corridor of Bonneville Power Administration's (BPA) Ross-Lexington

13

Microsoft Word - CX-LowerGranite-HatwaiAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Kristi Unholz Project Manager - TELF-TPP-3 Proposed Action: Improve the access road system in miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai transmission line PP&A Project No.: 2378 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines Location: As identified in table below: Lower Granite-Hatwai Access Road Project Location Township Range Section County, State mile 4 to mile 5 13N 43E 2 Whitman, WA mile 16 12N 45E 8 mile 17 12N 45E 17 mile 18 12N 45E 20 mile 30 36N 5W 19, 30 Nez Perce, ID Proposed by: Bonneville Power Administration (BPA)

14

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line in Tillamook and Yamhill counties, Oregon. Associated activities would include resurfacing roads, adding drainage, widening 3 miles of road, constructing 0.1 mile of new road, maintaining culverts, and constructing outlet ditches and retaining walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is available at the project website: http://efw.bpa.gov/environmental_services/Document_Library/Boyer-Tillamook/.

15

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

16

Microsoft Word - CX-GarrisonSubstationAccessRoadImprovementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Jonathan Malmberg Project Manager - TETQ-TPP-3 Proposed Action: Maintenance along sections of the access road leading to Bonneville Power Administration's (BPA) Garrison Substation PP&A Project No.: 2609 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance. B1.13 Pathways, short access roads, and rail lines. Location: As identified in table below: Township Range Section County 9N 11W 14, 13, 24 Powell 9N 10W 19, 30, 20 Powell Proposed by: BPA Description of the Proposed Action: BPA proposes repairing a corrugated metal pipe end; making minor asphalt repairs; and grading, shaping, compacting, and placing road aggregate on 20,005 linear feet

17

Microsoft Word - CX-McNary-SantiamAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

James Semrau Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance along the McNary-Santiam 230-kV and Jones Canyon-Santiam 230-kV transmission line corridors. Budget Information: WO #00292092 PP&A Project No.: 2044 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on the McNary-Santiam (structure 123/1) & Jones Canyon-Santiam (structure 75/1)

18

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

19

Microsoft Word - CX-AccessRoads-KingCoWA-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2013 22, 2013 REPLY TO ATTN OF: KEPR-Covington SUBJECT: Environmental Clearance Memorandum Rick Ross Engineer - TELF-TPP-3 Proposed Action: Covington District Culvert Replacements Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.3, Routine Maintenance Location: King County, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within DNR owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. The current stream crossings do not meet DNR fish passage standards that will be in

20

Microsoft Word - CX-Marion-AlveyMarion-LaneAccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Darin Bowman Manuel Campos Civil Engineer - TELF-TPP-3 Civil Engineer - TELF-TPP-3 Proposed Action: Access road improvements along portions of the Marion-Alvey #1 and Marion-Lane #1 transmission line rights-of-way. PP&A Project No: 1961 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose. Location: The project area is located in Marion and Linn counties, Oregon, in Bonneville

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - Class 1 S Access Road-031611 FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Carlsbad. New Mexico 88221 Carlsbad. New Mexico 88221 Mr. James Bearzi, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 MAR 1 7 2011 Subject: Notification of a Class 1 Permit Modification to the Hazardous Waste Facility Permit, Permit Number: NM4890139088· TSDF Dear Mr. Bearzi: Enclosed is a Class 1 Permit Modification Notification to: * Add South Access Road for Transportation of TRU Mixed Waste We certify under penalty of law that this document and the enclosure were prepared under our direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on our inquiry of the person or persons who manage the system, or those persons directly responsible for gathering

22

Microsoft Word - CX-GrandCouleeDistrictWoodPoleReplacementsAccessRoadsFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Todd Wehner Civil Design/Access Roads - TELF-TPP-3 James Semrau Project Manager - TEP-TPP-1 Proposed Action: Wood pole replacement, equipment landing construction, and access road improvements along various transmission lines in Bonneville Power Administration's (BPA) Grand Coulee District. PP&A Project No.: 2152 (Grand Coulee-Chief Joseph No. 1), 2151 (Grand Coulee-Chief Joseph No. 2), 2121 (Grand Coulee-Foster Creek No. 1) and 1776 (Grand Coulee-Okanogan No. 2) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Douglas and Okanogan counties, Washington. Refer to table below for project locations: Line Name Structure Township Range Section County

23

Template for Discontinuation of Access Eligibility Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEMORANDUM FOR (SUBJECT'S NAME) MEMORANDUM FOR (SUBJECT'S NAME) FROM: Personnel Security Program Manager SUBJECT: Discontinuation of Access Eligibility Determination Reference is made to your Questionnaire for National Security Positions (QNSP) signed [insert date], which was forwarded to this office in connection with a Department of Energy security clearance request. Your case was submitted to the Office of Personnel Management (OPM) and an investigation dated [insert date] has been received. [Insert a brief description of the circumstances such as: A review of your case reveals that you listed marijuana use 5-10 times from 8/01 to 5/05 on your QNSP. During the personal subject interview with OPM, you stated that the end date for the marijuana use was incorrect and the last time

24

Adjudicative Guidelines for Determining Eligibility for Access...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to help a foreign person, group, or country by providing that information; (c) counterintelligence information, that may be classified, indicates that the individual's access to...

25

Simulating the effect of access road route slection on wind farm construction  

Science Conference Proceedings (OSTI)

Wind energy as a power source is attractive alternative to fossil fuels. Wind farms are typically constructed in undeveloped rural areas with challenging topography. The lack of a paved road network leading to the site and within the site itself pose ...

Khaled Nassar; Mohamed El Masry; Hesham Osman

2010-12-01T23:59:59.000Z

26

Adjudicative Guidelines for Determining Eligibility for Access to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Adjudicative Guidelines for Determining Eligibility for Access to Adjudicative Guidelines for Determining Eligibility for Access to Classified Information Adjudicative Guidelines for Determining Eligibility for Access to Classified Information Introduction. The following adjudicative guidelines are established for all U.S. government civilian and military personnel, consultants, contractors, employees of contractors, licensees, certificate holders or grantees and their employees and other individuals who require access to classified information. They apply to persons being considered for initial or continued eligibility for access to classified information, to include sensitive compartmented information and special access programs, and are to be used by government departments and agencies in all final clearance determinations. Government departments and agencies may also choose to

27

Adjudicative Guidelines for Determining Eligibility for Access to Classified Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Adjudicative Guidelines for Determining Eligibility for Adjudicative Guidelines for Determining Eligibility for Access to Classified Information 1. Introduction. The following adjudicative guidelines are established for all U.S. government civilian and military personnel, consultants, contractors, employees of contractors, licensees, certificate holders or grantees and their employees and other individuals who require access to classified information. They apply to persons being considered for initial or continued eligibility for access to classified information, to include sensitive compartmented information and special access programs, and are to be used by government departments and agencies in all final clearance determinations. Government departments and agencies may also choose to apply these

28

CX-005845: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-005845: Categorical Exclusion Determination Selected Wood Pole Replacement and Minor Access Road Maintenance Along the Grand Coulee-Creston...

29

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

30

CX-006959: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6959: Categorical Exclusion Determination 6959: Categorical Exclusion Determination CX-006959: Categorical Exclusion Determination Installation of Traffic Signals on C-Road for the Biomass Cogeneration Facility Access Road CX(s) Applied: B1.32 Date: 09/22/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory Wood chip delivery at the new biomass plant will result in a substantial increase in truck traffic and create an unsafe condition at the intersection of C-Road, the F-Area access road, and the biomass cogeneration facility access road. The proposed activity is the installation of two traffic signals for the two outmost southbound lanes on C-Road, two traffic signals for the biomass access road, and associated signage, detector loops, pavements markings, concrete island demolition,

31

County, CA. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

access road maintenance access road maintenance and replacement of down guy wlfes and guy anchors on structure16/5 on the existing (Army Tap) Gila-Senator Wash 69-kV T.L. in Imperial County, CA. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct maintenance on access roads leading to structure 16/5 of the Gila-Senator Wash 69kV Transmission Line. All work will be done along existing access roads. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. A backhoe will be used during replacement of the anchor guy and down guys, This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area situated within Section 5 Township 15

32

CX-003232: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Categorical Exclusion Determination 32: Categorical Exclusion Determination CX-003232: Categorical Exclusion Determination Ostrander-Troutdale Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/30/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to rebuild and/or repair an existing access road and right-of-way road that provides access to the Ostrander-Troutdale Number 1 transmission line and right-of-way access for motile sites between mile/structure 10/1 to 17/3 and one site on the Big Eddy-Troutdale 63/1 ? 63/2 line. Ostrander-Troutdale Number 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

33

CX-003092: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct access road construction at a specific site along the Ross-Lexington Number 1, 115-kilovolt transmission line. This new access road is needed in order to provide access to transmission structures 15/1 and 15/2. The previous access road is no longer accessible due to property owner restrictions. Unrestricted access to transmission structures is a critical aspect of the Transmission Line Maintenance Program, which helps to insure the safety,

34

CX-009088: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3...

35

CX-003084: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3084: Categorical Exclusion Determination 3084: Categorical Exclusion Determination CX-003084: Categorical Exclusion Determination Maintenance of and Improvements to the Access Roads from Structure 53/3 through 66/3 of the Fairview-Rogue Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Curry County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the southern 13 miles of the Fairview-Rogue transmission line from Structure 53/3 to Structure 66/3. There are roughly 32 miles of access roads in this section of transmission line. The proposed access road project is part of ongoing operations and maintenance along this line and this work is proposed for 2010 and 2011.

36

CX-005847: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

847: Categorical Exclusion Determination 847: Categorical Exclusion Determination CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to build and/or repair approximately 18,000 feet of access road and right-of-way road that provides access to the Rocky Reach-Maple Valley Number 1 transmission line in King County, Washington. The work is necessary to repair damage done to access roads caused by a major flood event that occurred on November 7, 2006, and thus provide continued system stability. The project includes but is not limited to: - Reconstruction (blading, reshaping, grading, and compacting) of existing road surfaces - Hauling, placing, and shaping of

37

CX-002529: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29: Categorical Exclusion Determination 29: Categorical Exclusion Determination CX-002529: Categorical Exclusion Determination Access Road Improvements for Rattlesnake-Garrison Number-1 and Garrison-Anaconda Number-11 Transmission Lines CX(s) Applied: B1.13, B1.3 Date: 05/26/2010 Location(s): Granite County, Montana Office(s): Bonneville Power Administration The proposed project involves improving portions of the existing access road system for the subject transmission lines. Road improvements include blading existing road surfaces, realigning of steep roads to reduce grade, placing and compacting rock surfacing to improve drivability, and installing drainage devices to protect roads from erosion. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002529.pdf More Documents & Publications CX-005675: Categorical Exclusion Determination

38

CX-001182: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination CX-001182: Categorical Exclusion Determination Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line CX(s) Applied: B1.13 Date: 03/12/2010 Location(s): Snohomish, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a permanent access road to improve vehicle access to the 115 kilovolt Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line. The project would involve constructing an approximately 760-foot long by 14-foot wide access road to structure 12/1. The project would also involve the installation of three culverts to help preserve the site's existing hydrology and increase the longevity of the proposed access road. Project activities would occur in

39

CX-006575: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6575: Categorical Exclusion Determination 6575: Categorical Exclusion Determination CX-006575: Categorical Exclusion Determination Fairview-Rogue Access Road Maintenance Project CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the BPA Fairview-Rogue 230-kilovolt transmission line between Fairview Substation and State Highway 42. Approximately 8,800 feet of selected roads, which lay on and off of the BPA right-of-way (ROW), will be maintained as part of the proposed project. The proposed access road project is part of on-going operations and maintenance along this line and this work is proposed for 2011. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

40

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Brandon #1, Fairview-Brandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) 9/25/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 25, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Fairview-Bandon #1and #2 and Fairview- Rogue #1 transmission lines. Location: Throughout the Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1 corridors located within Coos and Curry counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

(DOE/EIS-0285/SA-109): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Santiam-Alvey # 1 #2 access road and structure clearing) 9/9/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 9, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-109) - (Santiam-Alvey # 1 and #2 access road and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Santiam-Alvey # 1 and #2 transmission line. Location: Throughout the Santiam-Alvey # 1 and #2 corridor located within Linn and Lane counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure

42

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion for erosion repair and cactus relocation along the existing Tucson-Apache 11S-kV transmission line in Pima County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to construct a new access road along the existing Tucson-Apache 11S-kV transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-2S/2 & 2S/3- 26/S. We will be installing two gates to limit right-of-way access from Houghton Road. We will be creating reinforced embankments through the placement of

43

CX-003085: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

085: Categorical Exclusion Determination 085: Categorical Exclusion Determination CX-003085: Categorical Exclusion Determination Boyer-Tillamook Number 1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to rebuild and/or repair existing access road and right-of-way (ROW) road in its Eugene Region that provides access to the Boyer-Tillamook Number 1 transmission line and ROW access for sites 3, 4, 6, 7, 9, 12 and 14 between mile/structure 9/3 and 24/5. Project work includes, but is not limited to: reshaping, grading and compacting existing road surfaces and turnouts; hauling, placing, and shaping of aggregate and Riprap; constructing or reconditioning of water

44

CX-006794: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

45

CX-003610: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610: Categorical Exclusion Determination 610: Categorical Exclusion Determination CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to re-construct an existing access road along the Ross-Lexington Number 1 transmission line right-of-way (ROW) located in Cowlitz County, Washington. During the winter of 2008-09 a portion of the access road washed out during heavy rain, making passage impossible. The remaining portions of the road are heavily damaged and in dire need of repair. The proposed action will allow safe and timely access to the right of way which will help reduce outage times and

46

CX-007152: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7152: Categorical Exclusion Determination 7152: Categorical Exclusion Determination CX-007152: Categorical Exclusion Determination Gila-Senator Wash Structure & Access Road Maintenance CX(s) Applied: B1.3 Date: 11/13/2009 Location(s): Imperial County, California Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct maintenance on access roads leading to structure 16/5 of the Gila-Senator Wash 69 kilovolt Transmission Line. All work will be done along existing access roads. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. A backhoe will be used during replacement of the anchor guy and down guys. This work is necessary to maintain the safety and reliability of the bulk electrical system.

47

CX-005852: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

852: Categorical Exclusion Determination 852: Categorical Exclusion Determination CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration plans to construct an extension of an existing access road between structures 111-1 and 111-2 on the Stegall-Wayside 230 kilovolt transmission line. This road construction will provide access for removal of previously felled hazard trees along the transmission line right-of-way on private land. The project will extend the existing access road to the south from its present terminus at structure 111-1 and terminate before reaching structure 111-2. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

48

CHESTNUT RIDGE RD VALLEY ROAD  

E-Print Network (OSTI)

.1 Miles 0.20 N Miles 0.20 TO MELTON VALLEY DRIVE HFIR PARKING WALK-IN ENTRY 7900 7964K - HFIR USER OFFICE RM 18 7972 HFIR High Flux Isotope Reactor 7962 HFIR User Office: 865-574-4523 BETHEL VALLEY RD BETHEL VALLEY RD BETHEL VALLEY RD RAMSEY DRIVE EGERACCESSROAD MELTON VALLEY DRIVE MELTON VALLEY ACCESS ROAD HFIR

49

CX-003089: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers approximately 1.5 miles of road. The

50

Title 10, Part 710 - Criteria and Procedures for Determining Eligibility for Access to Classified Matter or Special Nuclear Material  

NLE Websites -- All DOE Office Websites (Extended Search)

e-CFR Data is current as of April 7, 2008 e-CFR Data is current as of April 7, 2008 Title 10: Energy PART 710-CRITERIA AND PROCEDURES FOR DETERMINING ELIGIBILITY FOR ACCESS TO CLASSIFIED MATTER OR SPECIAL NUCLEAR MATERIAL Subpart A-General Criteria and Procedures for Determining Eligibility for Access to Classified Matter or Special Nuclear Material Source: 59 FR 35185, July 8, 1994, unless otherwise noted. General Provisions § 710.1 Purpose. (a) This subpart establishes the criteria, procedures, and methods for resolving questions concerning the eligibility of individuals who are employed by, or applicants for employment with, Department of Energy (DOE) contractors, agents, and access permittees, individuals who are DOE employees or applicants for DOE employment, and other persons designated by the Secretary of Energy, for access to Restricted Data

51

CX-006582: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

582: Categorical Exclusion Determination 582: Categorical Exclusion Determination CX-006582: Categorical Exclusion Determination Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line Corridors CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the rights-of-way. The work involves approximately 5,000 linear feet of road reconstruction or improvement work. The roadwork is needed to improve access for crews that will be maintaining the transmission line and towers within the transmission line corridor. The work will consist primarily of

52

CX-007172: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

53

CX-003086: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to improve existing access roads for the Cougar-Thurston and the Thurston-McKenzie transmission lines in Lane County, Oregon. The project includes blading, rocking, and installing proper drainage for the existing access roads that are degraded with rutting, erosion, cut bank destabilization, and improper surface water drainage characteristics. All road maintenance will take place within the

54

CX-006296: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

55

CX-001179: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

179: Categorical Exclusion Determination 179: Categorical Exclusion Determination CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) has a need to construct and repair approximately 4.1 miles of access road and build tower landings along the Lancaster-Noxon Number 1 Transmission Line. As a result of wet conditions at the site, there is currently no vehicle access between structures 46/3-50/1 during much of the year. Proposed project work includes: vegetation removal, grading and shaping of roads, installation of geo-textile material, placing and compacting of road surfacing, bridge

56

CX-003025: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25: Categorical Exclusion Determination 25: Categorical Exclusion Determination CX-003025: Categorical Exclusion Determination Maintenance of Access Roads Serving the Satsop-Aberdeen Number 2 and Number 3, and the Aberdeen Tap to South Elma-Cosmopolis Transmission Lines CX(s) Applied: B1.3 Date: 06/30/2010 Location(s): Gray's Harbor County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration proposes to improve existing access roads serving the Satsop-Aberdeen Number 2 and Number 3, and the Aberdeen Tap to South Elma-Cosmopolis transmission lines. The project includes blading, rocking, and installing proper drainage for the existing access roads that are degraded with rutting, erosion, cut bank destabilization, and improper surface water drainage characteristics. All road maintenance will take

57

CX-010728: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10728: Categorical Exclusion Determination 10728: Categorical Exclusion Determination CX-010728: Categorical Exclusion Determination Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads, both on and off the right-of-way (ROW). CX-010728.pdf More Documents & Publications CX-008708: Categorical Exclusion Determination CX-008693: Categorical Exclusion Determination

58

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2, 2009 November 2, 2009 CX-000008: Categorical Exclusion Determination Raver-Paul #1 Access Road Improvement and Bridge Replacement CX(s) Applied: B1.3 Date: 11/02/2009 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration October 27, 2009 CX-000007: Categorical Exclusion Determination Spirit Tap to Colville-Boundary #1 Landings and Access Roads Construction CX(s) Applied: B1.3, B1.13 Date: 10/27/2009 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration October 8, 2009 CX-000004: Categorical Exclusion Determination Lane-Wendson #1 Structure 10/5 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10/08/2009 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 8, 2009

59

CX-003090: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off (Ha-o-AR-125-1, 125-2, BC-AR-32) the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers

60

ENVIRONM~:NT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONM~:NT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION ENVIRONM~:NT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION Rocky Mountain Region, Western Area Power Administration CASPER-ARMIN TO VEGETATION MANAGEMENT MAINTENANCE, NATRONA COUNTY, WYOMING A. Brief Description of Proposal: This project, near Casper, Wyoming is to cut grease wood vegetation for approximately two miles from poles 10-5 to 13-1 along a segment of Western's CAS-A TO 115 kV transmission line. The vegetation cutting will be on existing access roadways and around transmission line poles using a rubber tired bobcat with a cutter attachment. Work is along existing access roads and will include work from the access roads to individual poles in order to minimize damage to maintenance truck tires. Several access road culverts in dry wash

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

CX-003447: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3447: Categorical Exclusion Determination 3447: Categorical Exclusion Determination CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration The project consists of replacing an existing wooden bridge deck on a Bonneville Power Administration access road to structures in mile 32 of the Monroe - Custer Number 1 transmission line corridor. Work includes furnishing materials and rebuilding the wood deck with low curb rails and reflectors. Both access road approaches will require re-grading and rocking. No fill or other construction materials are allowed at or below the high water line of the underlying stream. No in-stream activities are to occur in any water body or wetland. Erosion control best management

62

CX-007140: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: Categorical Exclusion Determination 40: Categorical Exclusion Determination CX-007140: Categorical Exclusion Determination Vegetation Removal and Access Road Maintenance along the existing Electrical District 2-Saguaro #2 115-kV transmission line CX(s) Applied: B1.3 Date: 03/21/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal and access road maintenance between structures 29/1 - 32/1, 32/11 - 33/2 and 34/5 - 34/11 along the existing Electrical District 2-Saguaro #2 115-kV transmission line. This will consist of blading brush and leveling out areas of the existing access road using a dozer with a grader attachment, crew trucks and pickup trucks to get crews to the project area. Western will use a dozer with a grader

63

CX-003196: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

196: Categorical Exclusion Determination 196: Categorical Exclusion Determination CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to conduct Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the existing Tucson-Apache 115-kilovolt transmission line. This will consist of blading and leveling out areas of the existing access road using a dozer and bucket trucks, crew trucks and pickup trucks to replace the crossarm at the structure. This work is necessary to maintain the safety and

64

CX-007155: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-007155: Categorical Exclusion Determination Mead-Perkins Avian Nest Removal & Access Road Maintenance CX(s) Applied: B1.3 Date: 05/10/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct access road maintenance between structures 180/1 & 188/2 of the existing Mead-Perkins 500-kilovolt transmission line. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. This work is needed to facilitate avian nest removal at structures 180/1, 182/2, 186/2 & 188/2. This work is necessary to maintain the safety and reliability of the bulk electrical system.

65

CX-003662: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

62: Categorical Exclusion Determination 62: Categorical Exclusion Determination CX-003662: Categorical Exclusion Determination Hygiene Substation Access Road Repairs CX(s) Applied: B1.3, B4.6 Date: 08/30/2010 Location(s): Boulder County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to repair the access road/driveway into the Hygiene substation. There is a low spot in the middle of the driveway that impedes maneuvering of large maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003662.pdf More Documents & Publications CX-003645: Categorical Exclusion Determination CX-005936: Categorical Exclusion Determination CX-009235

66

Recycled rubber roads  

SciTech Connect

The paper describes several innovative approaches for recycling old tires in the construction of roads. In one, 18 inches of shredded tire chips (2 X 2 inches) were used on top of 6-8 inches of small stone to construct a road across a sanitary landfill. No compacting or linders were needed. In another application, sidewall mats linked together with steel strapping were used as a sub-base for a road across a swampy area. A third application uses 1/2 inch bits of groundup rubber tires as a replacement for aggregate in an asphalt road base.

Not Available

1989-02-01T23:59:59.000Z

67

VEHICLE ACCESS PORTALS  

NLE Websites -- All DOE Office Websites (Extended Search)

East Jemez Road (Map 1) East Jemez Road (Map 1) VEHICLE ACCESS PORTALS Traffic Lane 1: Closed except for emergencies and maintenance operations. Traffic Lanes 2-7: Drivers required to stop and present LANL badges or other form of valid identification to Protective Force officers. Drivers may proceed upon direction of the officers. Note: Commercial delivery vehicle drivers must also pres- ent their inspection passes from Post 10. More Information: spp-questions@lanl.gov Non-work Hours Vehicles entering LANL at the East Jemez VAPs during non-work hours (between 7

68

Pore accessibility by methane and carbon dioxide in coal as determined by neutron scattering  

SciTech Connect

Contrast-matching ultrasmall-angle neutron scattering (USANS) and small-angle neutron scattering (SANS) techniques were used for the first time to determine both the total pore volume and the fraction of the pore volume that is inaccessible to deuterated methane, CD{sub 4}, in four bituminous coals in the range of pore sizes between {approx}10 {angstrom} and {approx}5 {micro}m. Two samples originated from the Illinois Basin in the U.S.A., and the other two samples were commercial Australian bituminous coals from the Bowen Basin. The total and inaccessible porosity were determined in each coal using both Porod invariant and the polydisperse spherical particle (PDSP) model analysis of the scattering data acquired from coals both in vacuum and at the pressure of CD{sub 4}, at which the scattering length density of the pore-saturating fluid is equal to that of the solid coal matrix (zero average contrast pressure). The total porosity of the coals studied ranged from 7 to 13%, and the volume of pores inaccessible to CD{sub 4} varied from {approx}13 to {approx}36% of the total pore volume. The volume fraction of inaccessible pores shows no correlation with the maceral composition; however, it increases with a decreasing total pore volume. In situ measurements of the structure of one coal saturated with CO{sub 2} and CD{sub 4} were conducted as a function of the pressure in the range of 1-400 bar. The neutron scattering intensity from small pores with radii less than 35 {angstrom} in this coal increased sharply immediately after the fluid injection for both gases, which demonstrates strong condensation and densification of the invading subcritical CO{sub 2} and supercritical methane in small pores.

He, Lilin [ORNL; Melnichenko, Yuri B [ORNL; Mastalerz, Maria [Indiana Geological Survey; Sakurovs, Richard [ORNL; Radlinski, Andrzej Pawell [ORNL; Blach, Tomasz P [ORNL

2012-01-01T23:59:59.000Z

69

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

Webb ­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8P P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R20R20 R23 R24R24 R25 Munrow Sport Centre R27 R26 R28

Sloman, Aaron

70

RING ROAD SOUTH IVERSITY ROAD WEST  

E-Print Network (OSTI)

­ Earth Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 PhysicsP P P Barber Institute ELSROAD M R.15 R.30 24h Security R.3 RING ROAD SOUTH U N IVERSITY ROAD WEST South Car Park P R21 R17 R18 R22 Main Library R19 R2020 R23 R2424 R25 Munrow Sport Centre R27 R26 R28 R

Yao, Xin

71

WILDLAND ROAD REMOVAL: RESEARCH NEEDS  

E-Print Network (OSTI)

Service. 2003. Road decommissioning monitoring report 2002.management agencies are decommissioning roads to mitigateto ten percent by decommissioning up to 160,000 kilometers

Switalski, T. Adam; Bissonette, John A.; DeLuca, Tom H.; Luce, Charles H.; Madej, Mary Ann

2003-01-01T23:59:59.000Z

72

CX-003645: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45: Categorical Exclusion Determination 45: Categorical Exclusion Determination CX-003645: Categorical Exclusion Determination Hygiene Substation Access Road Repairs CX(s) Applied: B1.3, B4.6 Date: 08/30/2010 Location(s): Boulder County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering of large maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, Colorado. All proposed construction will occur within the existing, disturbed substation

73

CX-003645: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3645: Categorical Exclusion Determination 3645: Categorical Exclusion Determination CX-003645: Categorical Exclusion Determination Hygiene Substation Access Road Repairs CX(s) Applied: B1.3, B4.6 Date: 08/30/2010 Location(s): Boulder County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to repair the access road/driveway into the Hygiene Substation. There is a low spot in the middle of the driveway that impedes maneuvering of large maintenance equipment in and out of the yard. Western plans to fill the low spot with road base and crumbled concrete fill. The Hygiene Substation is located in Boulder County, approximately 2 miles northwest of Longmont, Colorado. All proposed construction will occur within the existing, disturbed substation

74

CX-001180: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1180: Categorical Exclusion Determination 1180: Categorical Exclusion Determination CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing

75

Categorical Exclusion Determinations: Southwestern Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Southwestern Power Administration Categorical Exclusion Determinations: Southwestern Power Administration Categorical Exclusion Determinations issued by Southwestern Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD August 6, 2013 CX-010879: Categorical Exclusion Determination Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 25, 2013 CX-010880: Categorical Exclusion Determination Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 22, 2013 CX-010716: Categorical Exclusion Determination Short Mountain Access Road Easement Acquisition CX(s) Applied: B1.24

76

Alice on the Road  

E-Print Network (OSTI)

downhill, sucking her little Prius into the whoosh of theirsqueeze it all into her Prius with whatever paraphernaliaher absolute upper limit in the Prius, when she saw the road

Satterly, Faye Ann

2012-01-01T23:59:59.000Z

77

Blair Road Kudzu  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Management: Blair Road and Hwy 58 Intersection * Kudzu treated with foliar spray of Garlon 3a and Tordon by CSC in 2004. Photo by Harry Quarles Invasive Non-native...

78

Rapid road repair vehicle  

DOE Patents (OSTI)

Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

Mara, L.M.

1998-05-05T23:59:59.000Z

79

CX-008790: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

80

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Morrow Point 230-kV and 12.47-kV Transmission Lines Access Road Maintenance Morrow Point 230-kV and 12.47-kV Transmission Lines Access Road Maintenance Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration's Montrose Maintenance Field Office (Western) proposes to grade and maintain 5.9 miles of existing access roads. The roads access structures along the Curecanti to Morrow Point 230-kV and 12.47-kV Transmission Lines in Montrose County, Colorado. Maintenance will include installing culverts in dry crossings, pulling ditches, maintaining waterbars, removal of vegetation, sloughed soil, and rock from the access roads. The road maintenance will remain within the existing right-of-ways for access roads and transmission lines. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR Part 1021,

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

ACCESS CONTROL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TERMSDEFINITIONS FROM DOE M 470.4-7 ACCESS CONTROL. The process of permitting access or denying access to information, facilities, nuclear materials, resources, or designated...

82

The Road to 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road to 2010 Road to 2010 Addressing the nuclear question in the twenty first century July 2009 The Road to 2010 Addressing the nuclear question in the twenty first century Presented to Parliament by the Prime Minister, by Command of Her Majesty July 2009 Cm 7675 £14.35 Photograph on page 16 by EDF; © EDF Photograph on page 20 by BNFL; © BNFL, image from www.IAEA.org Photograph on page 26 by British Army; © Crown copyright/MoD, image from www.photos.mod.uk Photograph on page 34 by CTBTO; © CTBTO Preparatory Commission, image from www.CTBTO.org Photograph on pages 42 and 45 by Dean Calma; © Dean Calma, image from www.IAEA.org © Crown Copyright 2009 The text in this document (excluding the Royal Arms and other departmental or agency logos) may be reproduced free of

83

CX-006255: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

255: Categorical Exclusion Determination 255: Categorical Exclusion Determination CX-006255: Categorical Exclusion Determination Indian Cabin Road Repair Date: 06/22/2011 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to repair the damage caused by a slope failure on Indian Cabin Road. The damage to the road prevents access to approximately two miles of significant Western Electricity Coordinating Council (WECC) right-of-way (ROW) corridor containing BPA?s 500-kilovolt Wautoma-Ostrander and 45-kilovolt McNary-Ross transmission lines. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006255.pdf More Documents & Publications CX-008889: Categorical Exclusion Determination CX-006817: Categorical Exclusion Determination CX-005546

84

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance and avian nesting removal maintenance and avian nesting removal between structures 180/1 & 188/2 of the existing Mead-Perkins 500-kV transmission line in Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct access road maintenance between structures 180/1 & 188/2 of the existing Mead-Perkins 500-kV transmission line. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. This work is needed to facilitate avian nest removal at structures 180/1, 182/2, 186/2 & 188/2. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached A1ap shows the project areas are situated within Sections 13 & 24

85

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2010 March 16, 2010 CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration

86

The Bumpy Road to Hydrogen  

E-Print Network (OSTI)

It appears to us that hydrogen is a highly promising option0616 The Bumpy Road to Hydrogen Daniel Sperling Joan OgdenThe Bumpy Road to Hydrogen 1 Daniel Sperling and Joan Ogden

Sperling, Dan; Ogden, Joan M

2006-01-01T23:59:59.000Z

87

PELICAN ISLAND Graded dirt road  

E-Print Network (OSTI)

Audubon SanctuaryRecommended route A B C D E F 0.5 mile BOLIVAR PENINSULA N to Crystal Beach Paved road #12;Bryan Beach Old Brazos River 1 mile N Paved road Graded dirt road Walking path Dike/Berm Mudflat

Lee, Cin-Ty Aeolus

88

CX-010110: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

89

CX-010734: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within Department of Natural Resources (DNR) owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. CX-010734.pdf More Documents & Publications CX-008890: Categorical Exclusion Determination CX-010432: Categorical Exclusion Determination

90

CX-000555: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

91

CX-004897: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: Categorical Exclusion Determination 97: Categorical Exclusion Determination CX-004897: Categorical Exclusion Determination Flagstaff-Glen Canyon (Access Road Maintenance) CX(s) Applied: B1.3 Date: 10/01/2010 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to add additional culverts to the access road just north of the Flagstaff Substation. The work will consist of removing the ground material, adding additional culverts, replacing the same ground material and adding additional material as needed in the area described. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004897.pdf More Documents & Publications CX-010881: Categorical Exclusion Determination CX-010678: Categorical Exclusion Determination CX-007804

92

CX-010734: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

734: Categorical Exclusion Determination 734: Categorical Exclusion Determination CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within Department of Natural Resources (DNR) owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. CX-010734.pdf More Documents & Publications CX-008890: Categorical Exclusion Determination CX-010432: Categorical Exclusion Determination

93

RING ROAD SOUTH CHANCELLOR'S  

E-Print Network (OSTI)

Sciences R5 Aston Webb ­ B Block R6 Aston Webb ­ Great Hall R7 Aston Webb ­ C Block R8 Physics West R9P P 24-h Security R3 RING ROAD SOUTH CHANCELLOR'S COURT CHANCELLOR'S University Centre COURT Sports PitchesSports Pitches South Car Park R21 R17 R18 R22 Main Library R19 R23 R24 R 24 R14 R15 R16 East Gate O

Heinke, Dietmar

94

CX-006253: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53: Categorical Exclusion Determination 53: Categorical Exclusion Determination CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct transmission line maintenance along a portion of the North Bonneville-Ross #1 and North Bonneville-Troutdale #2 230-kilovolt transmission lines. The maintenance activities will take place within the existing transmission line and access road right-of-way easements and includes upgrading existing roads, developing new roads, installing two new wood pole structures and two new steel tower structures.

95

Road Decommissioning: Minimising the Adverse Ecological Effects of Roads i9n European Agriculture Landscapes  

E-Print Network (OSTI)

road corridors post-decommissioning, especially those roadsof RRE - that of road decommissioning. To date even thoughFor this reason, road decommissioning can potentially: (1)

Dolan, Lisa; Whelan, Pdraig M.

2007-01-01T23:59:59.000Z

96

Categorical Exclusion Determinations: Legacy Management | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Management Legacy Management Categorical Exclusion Determinations: Legacy Management Categorical Exclusion Determinations issued by Legacy Mangement. DOCUMENTS AVAILABLE FOR DOWNLOAD May 28, 2013 CX-010396: Categorical Exclusion Determination Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida CX(s) Applied: B3.1, B6.1 Date: 05/28/2013 Location(s): Florida Offices(s): Legacy Management May 28, 2013 CX-010533: Categorical Exclusion Determination Road Maintenance on roads Used to Access Groundwater Monitoring Wells South of the Tuba City, Arizona, Uranium Mill Tailing Remedial Action Title I Site CX(s) Applied: B1.3, B3.3, B6.1 Date: 05/28/2013 Location(s): Arizona Offices(s): Legacy Management November 2, 2012 CX-009399: Categorical Exclusion Determination

97

Scientific Access  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Access The APS is a open user facility that makes beam time available to the international scientific community through a peer-reviewed proposal process. Two access...

98

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 CX-007153: Categorical Exclusion Determination Glen Canyon substation Transformer Addition CX(s) Applied: B4.6 Date: 05/05/2011 Location(s): Coconino County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region May 5, 2011 CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region May 5, 2011 CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration May 5, 2011 CX-005845: Categorical Exclusion Determination

99

CX-006453: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination CX-006453: Categorical Exclusion Determination Geothermal Incentive Program - Matunaliec Residence geothermal (Deercliff Road) CX(s) Applied:...

100

ENVIRONMENT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CCW-MID TRANSMISSION LINE ACCESS ROAD MAINTENANCE CCW-MID TRANSMISSION LINE ACCESS ROAD MAINTENANCE Fremont County, Colorado A. Brief Description of Proposal: Western's Montrose Maintenance Field Office plans to grade roads on access roads to structures 147-5 to 148-4; 134-3 to 135-2 near Penrose, CO, Maintenance will include removal of sloughed soil and rock from the access roads and blading. Road work will remain within the existing right of way. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 eFR Part 1021, Subpart D.) B 1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment. .. (h) Repair of road embankments. C. Regulatory Requirements in 10 CFR 1021.410 (b): (See full text in regulation and attached checklist.) I) The proposed action fits within a class of actions that is listed in Appendix A or B to

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

KALELE ROAD Parking Office  

E-Print Network (OSTI)

Environ. Health Transportation Services Landscaping No Vehicle Access No Public Vehicle Access No Public Marine Fisheries Service East-West Kiosk Center for Korean Studies Pope Laboratory Sherman Laboratory St`uokalani Center for Student Services Maile Way Annexes Gilmore Hall Shidler College of Business Lab School Lockers

102

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description...

103

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief...

104

Autonomous Robotic Vehicle Road Following  

Science Conference Proceedings (OSTI)

A description is given of the system architecture of an autonomous vehicle and its real-time adaptive vision system for road-following. The vehicle is a 10-ton armored personnel carrier modified for robotic control. A color transformation that best discriminates ... Keywords: adaptive systems, adaptive vision system, armored personnel carrier, autonomous vehicle, color transformation, computer vision, computerised navigation, computerised pattern recognition, image coordinate system, image segmentation, maximum-likelihood pixel classification, military systems, real-time, road region boundary, road vehicles, road-following, robotic vehicle, robots

D. Kuan; G. Phipps; A.-C. Hsueh

1988-09-01T23:59:59.000Z

105

Road to Net Zero (Presentation)  

Science Conference Proceedings (OSTI)

A PowerPoint presentation on NREL's Research Support Facility (RSF) and the road to achieving net zero energy for new construction.

Glover, B.

2011-05-01T23:59:59.000Z

106

Open Access  

NLE Websites -- All DOE Office Websites (Extended Search)

Communication » Communication » Open Access Open Access Open access (OA) is the practice of providing unrestricted access via the Internet to peer-reviewed scholarly journal articles. Learn more below... Questions? Open Access Email Open access publishing and publications have experienced substantial growth, expansion and uptake in recent years. What exactly is an open access publication? There are many definitions, but in a nutshell an open access publication is a publication that provides immediately free online access to all users worldwide. This may sound like a tall order, and yet there are to date over 4000 journal publications that fit this definition. The need for this type of access has been driven by the out-of-control costs for scholarly publications. Statistics kept by the Association for Research Libraries

107

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flaming Gorge Microwave Site Communications Building Access Road Repairs Flaming Gorge Microwave Site Communications Building Access Road Repairs Daggett County, Utah A. Brief Description of Proposal: Westem Area Power Administration (Westem) proposes to conduct routine maintenance and repair an access road right-of-way to its Flaming Gorge microwave site communications building. The building is located on a hill to the west of the Flaming Gorge Dam visitor center parking lot. Road improvements will be conducted on approximately 500 linear feet of existing road to improve drivability and access by Western crews to the communications building. Western crews will utilize rubber-tired vehicles including a motor grader, backhoe tractor, and bobcat skid steer loader to improve the access road and create a safe travel surface.

108

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and structure replacement and structure replacement along the existing Casa Grande-Empire 11~-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Casa Grande-Empire115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk

109

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B1.13 Existing Regulations B1.13: Pathways, short access roads, and rail lines Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 25, 2013 CX-010604: Categorical Exclusion Determination

110

CX-006637: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-006637: Categorical Exclusion Determination Repair Storm Water Drainage Outside the T-Area Cap CX(s) Applied: B1.3 Date: 08/10/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office The existing drainage channel located to the west side of T-Area closure cap was experiencing heavy erosion. Modification to the channel was required to satisfy flow conditions and minimize the erosion. Installation of a temporary road to access the channel area was required and necessitated the removal of some trees in the floodplain. It is now desired to keep the access road on a permanent basis to accommodate the inspection/maintenance of the cap and drainage system which is required by the Comprehensive Environmental Response, Compensation and Liability Act

111

CX-003488: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

88: Categorical Exclusion Determination 88: Categorical Exclusion Determination CX-003488: Categorical Exclusion Determination New Verde Mine Investigations, Lease Tract C-G-26, Uranium Leasing Program CX(s) Applied: B1.28, B3.1 Date: 08/10/2010 Location(s): Mesa County, Colorado Office(s): Legacy Management Energy Fuels Resources Corporation (EFRC), lessee to the U.S. Department of Energy Office of Legacy Management, proposes to evaluate former mine workings associated with the New Verde Mine on Lease Tract C-G-26 in preparation for potential future mine development. This lease tract is on Calamity Mesa, along the southern flank of the Uncompahgre Plateau in southwestern Mesa County. The mine site would be accessed by workers on a former mine access road and on public roads. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

112

Life cycle assessment of LED road lighting.  

E-Print Network (OSTI)

???It is observed that the power consumption of road lighting is increased with the length of trafficable road in Hong Kong. The energy used in (more)

Chan, Ho-kan.

2012-01-01T23:59:59.000Z

113

EA-1941: Boyer-Tillamook Access Road Improvement Project, Tillamook...  

NLE Websites -- All DOE Office Websites (Extended Search)

walls. In addition, new bridges would be built, and culverts that currently block fish passage for anadromous and resident fish would be replaced. Additional information is...

114

VNG's Hampton Roads Pipeline Crossing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VNG's Hampton Roads Pipeline Crossing VNG's Hampton Roads Pipeline Crossing FUPWG Conference Fall 2008 Williamsburg, Virginia Connection to DTI at Quantico Columbia Limitations South Hampton Roads served by a single pipeline Southside dependent on back up systems LNG Propane/air Two supply sources to VNG What if we connected pipelines? It would take Two Water Crossings Two Compressor Stations Construction in densely populated cities It could Deliver over 200,000 Dth of incremental supply Serve VNG, Columbia and Dominion customers ...we would get... Hampton Roads Crossing - HRX Hampton / Newport News Craney Island Norfolk 21 miles of 24" pipe 7 miles in Hampton/Newport News 4 miles in Norfolk 10 miles of water and island crossing 4 mile harbor crossing 4.5 miles on Craney

115

CX-006583: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration Maintenance activities will take place within the existing transmission line right-of-way easement and include upgrading existing access roads, relocating or constructing short spur roads to structures, constructing equipment landings and performing maintenance on structures. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006583.pdf More Documents & Publications CX-006580: Categorical Exclusion Determination CX-010424: Categorical Exclusion Determination

116

CX-008779: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-008779: Categorical Exclusion Determination Curecanti-Poncha-Canon City West-Midway 230-Kilovolt Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, Colorado CX(s) Applied: B1.3 Date: 07/03/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to maintain sections of its access roads along the Curecanti (CCI)- Poncha (PON)- Canon City West (CCW) Midway (MID) 230-kilovolt transmission line segments. CX-008779.pdf More Documents & Publications CX-008778: Categorical Exclusion Determination CX-010109: Categorical Exclusion Determination EIS-0442: Draft Environmental Impact Statement

117

Early Cook County Roads -- Part One  

NLE Websites -- All DOE Office Websites (Extended Search)

One One Nature Bulletin No. 738 January 11, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PARK ONE When Chicago was incorporated as a village in 1833 it was only a squalid hamlet of about 350 inhabitants and appeared to be so poorly situated that it was hopeless -- "crude cabins and flimsy shacks in a chaos of mud, rubbish and confusion. " Only a few feet above the level of Lake Michigan, the place was almost entirely surrounded by swamps and miles and miles of prairies that became nearly impassable after spring thaws and during periods of heavy rainfall. There were only two important routes that afforded access at all times. One was the Green Bay Trail, ancestor of North Clark St. in Chicago, Ridge Ave. in Evanston, and Green Bay Road north of that. The other, traveled by the soldiers coming from Detroit to build Fort Dearborn in 1803, used the Great Sauk Trail to La Porte, Indiana, then a trail northwesterly to what is now Michigan City, and the firm sands of the lake beach the rest of the way.

118

Open Access  

E-Print Network (OSTI)

2007 Brewer; licensee BioMed Central Ltd. This is an Open Access article distributed under the terms of the Creative Commons Attribution License

Earl J Brewer; Earl J Brewer

2007-01-01T23:59:59.000Z

119

Notices Bldg., 901 Pilottown Road, Lewes, DE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 77, No. 249 / Friday, December 28, 2012 / Notices Bldg., 901 Pilottown Road, Lewes, DE 19958. January 17, 2013: 7-9 p.m.; Ocean County Administration Building, 101 Hooper Avenue, Public Hearing Room #119, Toms River, NJ 08754. Special Accommodations The hearings are physically accessible to people with disabilities. Requests for sign language interpretation or other auxiliary aids should be directed to M. Jan Saunders at the Mid-Atlantic Council Office, (302) 526-5251, at least 5 days prior to the hearing date. Dated: December 21, 2012. Tracey L. Thompson, Acting Deputy Director, Office of Sustainable Fisheries, National Marine Fisheries Service. [FR Doc. 2012-31148 Filed 12-27-12; 8:45 am] BILLING CODE 3510-22-P COMMODITY FUTURES TRADING

120

ACCESS CONTROL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TERMS/DEFINITIONS FROM DOE M 470.4-7 TERMS/DEFINITIONS FROM DOE M 470.4-7 ACCESS CONTROL. The process of permitting access or denying access to information, facilities, nuclear materials, resources, or designated security areas. ACCESS CONTROL MEASURES. Hardware and software features, physical controls, operating procedures, administrative procedures, and various combinations of these designed to detect or prevent unauthorized access to classified information; special nuclear materials; Government property; automated information systems, facilities, or materials; or areas containing the above and to enforce use of these measures to protect Departmental security and property interests. CRITICAL PATH SCENARIO. An adversary-based scenario that is generated during the conduct of a vulnerability assessment and accounts for adversary tactics that

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

CX-010533: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Road Maintenance on roads Used to Access Groundwater Monitoring Wells South of the Tuba City, Arizona, Uranium Mill Tailing Remedial Action Title I Site CX(s) Applied: B1.3, B3.3, B6.1 Date: 05/28/2013 Location(s): Arizona Offices(s): Legacy Management

122

Suggested Talking Points for Hydrogen Road Tour | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour Suggested Talking Points for Hydrogen Road Tour More Documents & Publications...

123

Virginia EV Road Show - PHEV Operations and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

- Virginia EV Road Show - PHEV Operations and Performance Jim Francfort Virginia Clean Cities and Hampton Roads Clean Cities Coalition - Virginia Electric Drive Road Show Poquoson,...

124

CX-010106: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region

125

CX-010552: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Big George Substation Access Road Snow Prevention, Park County, Wyoming CX(s) Applied: B1.11 Date: 06/20/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

126

CX-008878: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration

127

CX-008687: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bandon-Rogue Transmission Line Rebuild Project - Fiscal Year 2012 Culvert Replacement and Associated Access Road Reconstruction CX(s) Applied: B1.3 Date: 07/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

128

CX-010720: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe-Custer #2 Access Roads CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

129

CX-010716: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Short Mountain Access Road Easement Acquisition CX(s) Applied: B1.24 Date: 07/22/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration

130

CX-010423: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Underwood Tap Structure Replacement and Access Road CX(s) Applied: B4.6 Date: 06/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration

131

Infrared Thermometry in Winter Road Maintenance  

Science Conference Proceedings (OSTI)

There is significant interest among road authorities in measuring pavement conditions to perform appropriate winter road maintenance. The most common monitoring methods are based on pavement-mounted sensors. This studys hypothesis is that the ...

Patrik Jonsson; Mats Riehm

2012-06-01T23:59:59.000Z

132

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

near 10 structure locations along the existing Casa Grande-Empire 115-kV transmission line located in Pinal County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-ED #5115-kV transmission line. This project involves accessing each bore hole location with a augerldrill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas. The attached maps show the project areas situated within Sections 7,20 & 32

133

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance maintenance along the exis!ing Blythe-Knob 161-kV transmission Ime in Maricopa County. Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace broken crossarms at structures 32/3,6312 and cross brace repair at structure 31/2 along the existing Blythe - Knob 161-kV transmission line. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached maps show the project area is situated within Sections 15 & 21 Township 11 South Range 20 East & Section 10 Township 16 South Range 21 East on the San Bernardino Meridian, Imperial County, California. The corresponding

134

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

addition of addition of aerial marker balls along the existing Prescott -Pinnacle Peak & Pinnacle Peak-Rogers 230-kV Transmission Line right-of-ways located in Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes removing 2 existing marker balls at structures 0/4 & 0/5 of the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line & installing aerial marker ball equipment on all static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line on the north side of structures 216/1-216/3 & the southeast side of structures 0/3-0/5 on the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line. The diverters will be installed using a hot stick by accessing the structure using existing access roads and

135

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

near 9 near 9 structure locations along the existing ED2-ED5 230-kV transmission line located in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A, Proposed Action: Western proposes to do geologic borings within our right-of-way near structures 21/5,22/5,23/6,25/4,26/5,27/6,28/5,29/5 & 30/4 along the existing ED2-ED5 230-kV transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas. The attached maps show the project areas situated within Sections 7, 18, 30 & 31

136

Adaptive Routing for Road Traffic  

Science Conference Proceedings (OSTI)

Several technologies for motorists ease their travel on today's congested roads. However, these services aren't linked to each other and using them while driving can be dangerously distracting. This article reports on an integrated system that uses congestion ... Keywords: routing, congestion, Trafficmaster, GPS, GSM.

John Fawcett; Peter Robinson

2000-05-01T23:59:59.000Z

137

CX-002692: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

692: Categorical Exclusion Determination 692: Categorical Exclusion Determination CX-002692: Categorical Exclusion Determination Drill One Exploratory Hole On Lease Tract C-WM-17 by Golden Eagle Uranium CX(s) Applied: B3.1, B1.3 Date: 06/02/2010 Location(s): Montrose County, Colorado Office(s): Legacy Management Golden Eagle Uranium (LLC) proposes to drill one 5-inch-diameter exploratory borehole on U.S. Department of Energy (DOE) lease tract C-WM-17, located in western Montrose County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet (ft) below ground surface (bgs). The proposed location of the drill hole is in a previously disturbed area and is adjacent to a two-track dirt road. Access to the site would be on existing dirt roads. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

138

CX-005026: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

026: Categorical Exclusion Determination 026: Categorical Exclusion Determination CX-005026: Categorical Exclusion Determination Bob Jones Bike Trail-Southern Connection CX(s) Applied: B1.32, B5.1 Date: 01/12/2011 Location(s): San Luis Obispo, California Office(s): Energy Efficiency and Renewable Energy Energy Efficiency and Conservation Block Grant. The proposed project scope consists of installing a 120 foot by 8 foot wide single-span weathered steel bridge for bikes and pedestrians across San Luis Creek just to the South of the existing Prado Road Bridge for vehicles. This will allow cyclists and pedestrians to access the trail without having to cross over the Prado Road Bridge, which is very narrow and presents an unsafe passage for cyclists and pedestrians. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

139

CX-003237: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

237: Categorical Exclusion Determination 237: Categorical Exclusion Determination CX-003237: Categorical Exclusion Determination Chehalis-Raymond Number 1 2010 Line Rebuild CX(s) Applied: B4.6 Date: 07/19/2010 Location(s): Lewis County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to rebuild the first 19 miles of the Chehalis-Raymond Number 1, 115 kilovolt transmission line from Chehalis Substation to Pe Ell Substation. The subject transmission line has reached its designed service age and needs to be replaced to insure system reliability and the safe operation. The proposed project includes replacement of all wood pole support structures, electrical conductor, support guys, and associated hardware. Additionally, some minor road maintenance will be completed to gain access to structures where road

140

CX-007150: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination Gila-Knob Structure, Access Road Maintenance & Vegetation Removal CX(s) Applied: B4.6 Date: 08/02/2011 Location(s): Yuma County, AZ; Imperial County, CA, Arizona, California Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct maintenance at structures of the existing Gila-Knob 161-kilovolt transmission line and any other structures east of 16/5, identified by maintenance crews while out in the field. This work will consist of replacing transmission poles, cross arms, cross braces and/or vegetation removal. Western also needs to repair erosion on the Imperial Irrigation District canal road and canal bank near structure 16-5.

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

CX-007149: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

49: Categorical Exclusion Determination 49: Categorical Exclusion Determination CX-007149: Categorical Exclusion Determination Gila-Knob Structure, Access Road Maintenance & Vegetation Removal Amendment 1 CX(s) Applied: B4.6 Date: 02/18/2011 Location(s): Yuma County, AZ; Imperial County, CA, Arizona, California Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct maintenance at structures of the existing Gila-Knob 161-kilovolt transmission line and any other structures east of 16/5, identified by maintenance crews while out in the field. This work will consist of replacing transmission poles, cross arms, cross braces and/or vegetation removal. Western also needs to repair erosion on the Imperial Irrigation District canal road and canal bank near structure 16-5.

142

CX-007151: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

151: Categorical Exclusion Determination 151: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination Gila-Knob Structure, Access Road Maintenance & Vegetation Removal CX(s) Applied: B4.6 Date: 02/07/2011 Location(s): Yuma County, AZ; Imperial County, CA, Arizona, California Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct maintenance at structures of the existing Gila-Knob 161-kilovolt transmission line and any other structures east of 16/5, identified by maintenance crews while out in the field . This work will consist of replacing transmission poles, cross arms, cross braces and/or vegetation removal. Western also needs to repair erosion on the Imperial Irrigation District canal road and canal bank near structure 16-5.

143

KALELE ROAD D Dormitory Lot  

E-Print Network (OSTI)

Environ. Health Transportation Services Landscaping No Vehicle Access No Public Vehicle Access No Public Kiosk Bachman Kiosk Gym 1 Gym 2 UH Parking Access St. Francis School University Health Services Mnoa Fisheries Service East-West Kiosk Center for Korean Studies Pope Laboratory Sherman Laboratory St. John

144

Categorical Exclusion Determinations: B4.10 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Categorical Exclusion Determinations: B4.10 Existing Regulations B4.10: Removal of electric transmission facilities Deactivation, dismantling, and removal of electric transmission facilities (including, but not limited to, electric powerlines, substations, and switching stations) and abandonment and restoration of rights-of-way (including, but not limited to, associated access roads). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 13, 2013 CX-010727: Categorical Exclusion Determination Dayton Tap Line Retirement

145

Securing SCADA communication using hybrid cryptographyNOTE FROM ACM: It has been determined that the authors of this article plagiarized the contents from a previously published paper. Therefore ACM has shut off access to this paper.  

Science Conference Proceedings (OSTI)

NOTE FROM ACM: It has been determined that the authors of this article plagiarized the contents from a previously published paper. Therefore ACM has shut off access to this paper. For further information, contact the ACM ... Keywords: cryptography algorithms, security issues, supervisory control and data acquisition (SCADA)

AAmir Shahzad; Shahrulniza Musa

2012-02-01T23:59:59.000Z

146

Vortex induced vibration for aquatic clean power (VIVACE)NOTE FROM ACM: It has been determined that the author of this article plagiarized the contents from a previously published paper. Therefore ACM has shut off access to this paper.  

Science Conference Proceedings (OSTI)

NOTE FROM ACM: It has been determined that the author of this article plagiarized the contents from a previously published paper. Therefore ACM has shut off access to this paper. The paper by M. K. Raj and B. G. Muthuraj plagiarizes the ... Keywords: VIVACE, reynolds number, undulations, vortex shedding, vortex vibrations

M. K. Raj; B. G. Muthuraj

2011-02-01T23:59:59.000Z

147

Tanzania Roads Evaluation - Baseline | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Tanzania Roads Evaluation - Baseline Tanzania Roads Evaluation - Baseline Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Tanzania Roads Evaluation - Baseline Dataset Summary Description Baseline survey for impact evaluation of MCC's roads improvement investments in Tanzania. The evaluation will examine the project's household- and community-level effects on local standards of living along the roads. For the evaluation of major roads on the mainland, Economic Development Initiatives conducted a survey of 3,000 households in 200 communities in 2009. For the Pemba rural roads evaluation, Economic Development Initiatives conducted a survey on 570 households in the treatment group and 630 households in the comparison group.

148

Categorical Exclusion Determinations: American Recovery and Reinvestment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: American Recovery and Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations issued for actions related to the the American Recovery and Reinvestment Act of 2009. DOCUMENTS AVAILABLE FOR DOWNLOAD June 28, 2010 CX-002841: Categorical Exclusion Determination Texas Propane Fleet Pilot Program (Summary Categorical Exclusion) CX(s) Applied: A7, B5.1 Date: 06/28/2010 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 25, 2010 CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines

149

CX-007127: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-007127: Categorical Exclusion Determination Blythe-Knob CX(s) Applied: B1.3 Date: 03/21/2011 Location(s): Imperial County, California, Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace broken crossarms at structures 32/3,6312 and cross brace repair at structure 31/2 along the existing Blythe - Knob 161-kilovolt transmission line. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007127.pdf More Documents & Publications CX-007800: Categorical Exclusion Determination CX-007159: Categorical Exclusion Determination

150

CX-002365: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-002365: Categorical Exclusion Determination Arctic Ice and Snow Roads Conference CX(s) Applied: A9, A11 Date: 05102010 Location(s): Juneau,...

151

Comparison of dynamometer power absorption characteristics and vehicle road load measurements  

SciTech Connect

The report presents vehicle road load force versus speed curves and Clayton dynamometer force versus speed curves. The vehicle road load force data were collected in the recent road load project, where the vehicle road load, as a function of speed, was determined for sixty-three light-duty vehicles. The dynamometer data were obtained from the six EPA certification dynamometers. This data is first used to generate an equation to represent an average emission dynamometer. The variations of the individual dynamometers about this average dynamometer curve are discussed. Subsequently, each vehicle curve is compared to this average dynamometer curve. Variations between different vehicles are discussed, and the possible intrinsic error caused by differences between the shape of the dynamometer force versus speed curve and the typical vehicle road load curve is investigated.

Thompson, G.D.; Torres, M.

1977-07-01T23:59:59.000Z

152

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

153

An Automated Nowcasting Model of Road Surface Temperature and State for Winter Road Maintenance  

Science Conference Proceedings (OSTI)

Winter road maintenance is an important application field of meteorology in western and northern Europe, North America, and many other parts of the world. In order to provide timely short-period high-accuracy forecasts of road surface temperature ...

J. Shao; P. J. Lister

1996-08-01T23:59:59.000Z

154

Towards a user-centred road safety management method based on road traffic simulation  

Science Conference Proceedings (OSTI)

One of the most important gaps in road safety management practises is the lack of mature methods for estimating reliability. Road safety performance assessment systems have been developed; however, these provide only historical or retrospective analyses. ...

Andreas Gregoriades

2007-12-01T23:59:59.000Z

155

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

configuration, and in the same location. All work will be confined to Western's right-of-way easement. Existing access would be used and no new roads are proposed. Equipment used...

156

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Curecanti-Lost Canyon 230-kV Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado 1 A. Brief...

157

CX-009408: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way CX(s) Applied: B1.3 Date: 05222012 Location(s): Colorado, Colorado,...

158

CX-009703: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12192012 Location(s):...

159

Access Control: Policies, Models, and Mechanisms  

Science Conference Proceedings (OSTI)

Access control is the process of mediating every request to resources and data maintained by a system and determining whether the request should be granted or denied. The access control decision is enforced by a mechanism implementing regulations established ...

Pierangela Samarati; Sabrina De Capitani di Vimercati

2000-09-01T23:59:59.000Z

160

Categorical Exclusion Determinations: Wyoming | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 26, 2011 May 26, 2011 CX-006716: Categorical Exclusion Determination New B-1-3 Pit and Box Construction CX(s) Applied: B1.3, B6.1 Date: 05/26/2011 Location(s): Casper, Wyoming Office(s): RMOTC May 17, 2011 CX-006719: Categorical Exclusion Determination Casing Drilling Test CX(s) Applied: B1.3, B3.7, B5.12 Date: 05/17/2011 Location(s): Casper, Wyoming Office(s): RMOTC May 5, 2011 CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region April 29, 2011 CX-005664: Categorical Exclusion Determination Development and Testing of Compact Heat Exchange Reactors (CHER) for Synthesis of Liquid Fuels CX(s) Applied: B3.6

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

162

Categorical Exclusion Determinations: Oklahoma | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 30, 2009 November 30, 2009 CX-000551: Categorical Exclusion Determination Access Road Re-clear CX(s) Applied: B4.6 Date: 11/30/2009 Location(s): Oklahoma Office(s): Southwestern Power Administration November 19, 2009 CX-000196: Categorical Exclusion Determination Alternative Crops and Biofuels Production CX(s) Applied: A9 Date: 11/19/2009 Location(s): Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 9, 2009 CX-000045: Categorical Exclusion Determination Cheyenne River Sioux Tribe Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1 Date: 11/09/2009 Location(s): Oklahoma Office(s): Energy Efficiency and Renewable Energy September 24, 2009 CX-004617: Categorical Exclusion Determination Cheyenne and Arapaho Tribes of Oklahoma - Energy Efficiency Retrofits

163

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2010 August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination Badger Canyon Substation Radio Communication Tower Project CX(s) Applied: B1.7, B1.19 Date: 08/25/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration August 24, 2010 CX-003613: Categorical Exclusion Determination

164

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2012 September 19, 2012 CX-009203: Categorical Exclusion Determination Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 19, 2012 CX-009200: Categorical Exclusion Determination Respond to the Town of Eatonville's Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009202: Categorical Exclusion Determination Port Angeles Substation Equipment Additions

165

Categorical Exclusion Determinations: Idaho | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 19, 2012 December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration December 17, 2012 CX-009790: Categorical Exclusion Determination National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study CX(s) Applied: B3.1 Date: 12/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office December 15, 2012 CX-009635: Categorical Exclusion Determination INTEC - U-233 Waste Stream Disposition CX(s) Applied: NO CX GIVEN Date: 12/15/2012 Location(s): Idaho Offices(s): Idaho Operations Office December 5, 2012 CX-009634: Categorical Exclusion Determination

166

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009201: Categorical Exclusion Determination Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 09/14/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration September 12, 2012 CX-009206: Categorical Exclusion Determination Chahalpam Property Funding CX(s) Applied: B1.25 Date: 09/12/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 12, 2012 CX-009205: Categorical Exclusion Determination Rice Flats Electrode Site Maintenance and Inspection Project

167

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

tor the addition ot bird tor the addition ot bird diversion equipment along the existing Prescott-Pinnacle Peak 230-kV transmission line right-ot-way located in Yavapai County, Arizona . RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes installing Firefly type bird diversion equipment onto static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line between structures 144/3 and 145/2. The diverters will be spaced approximately 15 ft apart alternating between the two static lines. The diverters will be installed using a hot stick from a helicopter or by accessing the line using existing access roads and rubber-tired vehicles such as cherry pickers, pickup trucks, crew trucks. All work will be done within Westerns existing right-of-way. This

168

On-Road Emissions in Asia Measured by Remote Sensing.  

E-Print Network (OSTI)

On-Road Emissions in Asia Measured by Remote Sensing. · Donald H. Stedman, Gary A. Bishop on-road advantage · Large on-road emissions cause poor air quality. · Remote sensing measures on

Denver, University of

169

Road traffic congestion in the developing world  

Science Conference Proceedings (OSTI)

Road traffic jams continue to remain a major problem in most cities around the world, especially in developing regions resulting in massive delays, increased fuel wastage and monetary losses. Due to the poorly planned road networks, a common outcome ... Keywords: congestion collapse, simulation, traffic congestion, traffic detection

Vipin Jain; Ashlesh Sharma; Lakshminarayanan Subramanian

2012-03-01T23:59:59.000Z

170

Road Surface Condition Forecasting in France  

Science Conference Proceedings (OSTI)

A numerical model designed to simulate the evolution of a snow layer on a road surface was forced by meteorological forecasts so as to assess its potential for use within an operational suite for road management in winter. The suite is intended ...

L. Bouilloud; E. Martin; F. Habets; A. Boone; P. Le Moigne; J. Livet; M. Marchetti; A. Foidart; L. Franchistguy; S. Morel; J. Noilhan; P. Pettr

2009-12-01T23:59:59.000Z

171

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to the ALS Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to...

172

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Gate Access Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to register...

173

CX-007154: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7154: Categorical Exclusion Determination 7154: Categorical Exclusion Determination CX-007154: Categorical Exclusion Determination Liberty-Coolidge Structure Maintenance CX(s) Applied: B1.3 Date: 12/16/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal and maintenance at structures 2/1, 3/3, 3/5, 10/2, 13/5, 17/5, 18/5, 20/2, 20/3, 22/4, 22/8, 23/2,23/3,24/1,24/3,33/6,51/2,5413 & 56/3 of the existing Liberty-Coolidge 230- kilovolt transmission line. This work will consist of replacing bad structure poles, ground wires and anchors, crossarms & cross braces, insulators, conductors and hardware. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is

174

CX-007169: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will

175

CX-007165: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-007165: Categorical Exclusion Determination Prescott-Pinnacle Peak Bird Diversion Equipment Addition CX(s) Applied: B1.20 Date: 12/15/2010 Location(s): Yavapai County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes installing Firefly type bird diversion equipment onto static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kilovolt transmission line between structures 144/3 and 145/2. The diverters will be spaced approximately 15 feet apart alternating between the two static lines. The diverters will be installed using a hot stick from a helicopter or by accessing the line using existing access roads and rubber-tired vehicles such as cherry pickers, pickup trucks, crew trucks.

176

CX-010098: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Categorical Exclusion Determination 8: Categorical Exclusion Determination CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration (WAPA) proposes to install bird discouragers on a portion of the PHX-LOB 230-kV (kilovolt) transmission line. Access is via existing rural and transmission line access roads. Birds perching on structures are causing line faults and tripping the line out of service. The purpose of the project is to insure the continued safe and reliable operation of the bulk power system by reducing or eliminating faults due to bird activity along the line.

177

CX-007139: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39: Categorical Exclusion Determination 39: Categorical Exclusion Determination CX-007139: Categorical Exclusion Determination Electrical District 2- Electrical District 5 Geological Boring CX(s) Applied: B3.1 Date: 05/16/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 21/5, 22/5, 23/6, 25/4, 26/5, 27/6, 28/5, 29/5 & 30/4 along the existing electrical district (ED) #2-ED5 230-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring

178

CX-007130: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-007130: Categorical Exclusion Determination Casa Grande-Empire CX(s) Applied: B3.1 Date: 09/14/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-electrical district #5 115-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas.

179

Murdock Road Knoxville.TN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

702 702 Murdock Road Knoxville.TN 37932 Tel: (609) 921-1456 Fax: (609) 92 1-8703 AA\W.nell-one.com March 25,2009 Office of the Assistant General Counsel for Technology Transfer and Intellectual Property U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attn: Technology Transfer Questions Subject: Questions Concerning Technology Transfer Practices at DOE Laboratories (Federal RegisterNol. 73, No. 229/ November 26,2008 /Notices) Dear Mr. Gottlieb, Thank you for the opportunity to respond to the questions published in the Federal Register. As Chief Executive Officer of Nell One Therapeutics, a spin-out company which is in the process of licensing technology from Oak Ridge National Laboratory (ORNL), I found the questions to be highly relevant to our experiences. While many great technologies and capabilities reside in the National Laboratories

180

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

breaker replacement breaker replacement and power and control cable addition within the fenced area of the Flagstaff Substation located in Coconino County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes on removing 4 existing 345-kV circuit breakers and installing 4 new 362-kV circuit breakers as well as adding new power and control cables in existing cable trenches to the control building. Excavation of the old trench to a minimum depth of 18 inches and 3 feet wide will be required. The disturbed ground will be use as backfill. The proposed action within the fenced area of the Flagstaff Substation is necessary to maintain the safety and reliability of the bulk electrical system . Western will use existing access roads and vehicles such as

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

upgrading to a upgrading to a double circuit of 3.6 miles of the existing Casa Grande-Empire 11S-kV transmission line located in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 11S-kV transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work areas. The attached map shows the project area situated within Sections 19, 30 & 31 of

182

Alaskan Ice Road Water Supplies Augmented by Snow Barriers  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2013 6, 2013 Alaskan Ice Road Water Supplies Augmented by Snow Barriers Washington, D.C. - In a project supported and managed by the Office of Fossil Energy's National Energy Technology Laboratory (NETL), researchers at the University of Alaska Fairbanks have demonstrated that the use of artificial barriers-snow fences-can significantly increase the amount of fresh water supplies in Arctic lakes at a fraction of the cost of bringing in water from nearby lakes. The results promise to enhance environmentally sound development of Alaska's natural resources, lowering the costs of building ice roads used for exploring for oil and natural gas in Alaska. They could also be used to help augment fresh water supplies at remote villages. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift.

183

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

184

Categorical Exclusion Determinations: Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 7, 2011 February 7, 2011 CX-007151: Categorical Exclusion Determination Gila-Knob Structure, Access Road Maintenance & Vegetation Removal CX(s) Applied: B4.6 Date: 02/07/2011 Location(s): Yuma County, AZ; Imperial County, CA, Arizona, California Office(s): Western Area Power Administration-Desert Southwest Region January 25, 2011 CX-005545: Categorical Exclusion Determination Installation of Metering and Circuit Breaker at Powell 69-Kilovolt Substation CX(s) Applied: B4.11 Date: 01/25/2011 Location(s): Page, Arizona Office(s): Western Area Power Administration-Colorado River Storage Project Management Center January 7, 2011 CX-007164: Categorical Exclusion Determination Prescott-Pinnacle Peak & Pinnacle Peak-Rogers Aerial Marker Ball Addition CX(s) Applied: B1.9

185

Categorical Exclusion Determinations: Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 8, 2010 July 8, 2010 CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region July 6, 2010 CX-003004: Categorical Exclusion Determination Arizona-Tribal Energy Program-Hualapai Tribe CX(s) Applied: A9, B3.1 Date: 07/06/2010 Location(s): Hualapai Tribe, Arizona Office(s): Energy Efficiency and Renewable Energy July 2, 2010 CX-002842: Categorical Exclusion Determination Overcoming Critical Barriers to United States Wind Power; A University-Industry Consortium CX(s) Applied: A9 Date: 07/02/2010

186

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

187

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 3, 2010 August 3, 2010 CX-003222: Categorical Exclusion Determination Oregon American Recovery and Reinvestment Act State Energy Program - Eastern Oregon Correctional Institution Solar Thermal CX(s) Applied: B5.1 Date: 08/03/2010 Location(s): Pendleton, Oregon Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 30, 2010 CX-003232: Categorical Exclusion Determination Ostrander-Troutdale Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/30/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration July 20, 2010 CX-003603: Categorical Exclusion Determination Competitive Energy Efficiency and Conservation Block Grant Awards - Oregon Coast Regional Transit Program CX(s) Applied: A1, A9, A11, B5.1 Date: 07/20/2010

188

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

189

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

190

Categorical Exclusion Determinations: B3.14 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Categorical Exclusion Determinations: B3.14 Existing Regulations B3.14: Small-scale educational facilities Siting, construction, modification, operation, and decommissioning of small-scale educational facilities (including, but not limited to, conventional teaching laboratories, libraries, classroom facilities, auditoriums, museums, visitor centers, exhibits, and associated offices) within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Operation may include, but is not limited to, purchase, installation, and operation of equipment (such as audio/visual and laboratory equipment) commensurate with the educational purpose of the facility. DOCUMENTS AVAILABLE FOR DOWNLOAD July 22, 2013

191

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B1.15 Existing Regulations B1.15: Support buildings Siting, construction or modification, and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated and modular buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible). Covered support buildings and structures include, but are not limited to, those for office purposes; parking; cafeteria services; education and training; visitor reception; computer and data processing services; health services or recreation activities; routine maintenance activities; storage of supplies and equipment for administrative services and routine maintenance activities; security (such as security posts); fire

192

Categorical Exclusion Determinations: B3.12 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B3.12 Existing Regulations B3.12: Microbiological and biomedical facilities Siting, construction, modification, operation, and decommissioning of microbiological and biomedical diagnostic, treatment and research facilities (excluding Biosafety Level-3 and Biosafety Level-4), in accordance with applicable requirements and best practices (such as Biosafety in Microbiological and Biomedical Laboratories, 5th Edition, Dec. 2009, U.S. Department of Health and Human Services) including, but not limited to, laboratories, treatment areas, offices, and storage areas, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Operation may include the purchase, installation, and operation of

193

Categorical Exclusion Determinations: B3.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B3.15 Existing Regulations B3.15: Small-scale indoor research and development projects using nanoscale materials Siting, construction, modification, operation, and decommissioning of facilities for indoor small-scale research and development projects and small-scale pilot projects using nanoscale materials in accordance with applicable requirements (such as engineering, worker safety, procedural, and administrative regulations) necessary to ensure the containment of any hazardous materials. Construction and modification activities would be within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013

194

U.S. Virgin Islands Energy Road Map: Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virgin Islands Energy Road Map: Analysis Virgin Islands Energy Road Map: Analysis U.S. Virgin Islands Energy Road Map: Analysis This report lays out the strategy envisioned by the stakeholders in the U.S. Virgin Islands, U.S. Department of Energy, and U.S. Department of Interior to achieve the ambitious goal of achieving a 60% reduction in business-as-usual fossil fuel demand by 2025 (60x25) within the electricity sector. Instead, this work and supporting analysis provides a framework within which decisions can begin to be made, a concrete vision of what the future might hold, and a guide to determine what questions should follow. 52360.pdf More Documents & Publications USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin

195

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Flaming Gorge to Vernal No. 1138-kV Transmission Line Structut·e Replacements Flaming Gorge to Vernal No. 1138-kV Transmission Line Structut·e Replacements Uintah County, Utah A. Brief Description of Pt·oposal: Western Area Power Administration (Western) proposes to replace structure 36/5 along its Flaming Gorge to Vernal No. I 138-kV Transmission Line. The work will occur along the transmission line access road in Uintah County, Utah, Township 5 South, Range 22 East, Sectiot} 22 of the Salt Lake Principle Meridian. The structure is a wood pole H-frame design and is located along a well-defined access road approximately 200 meters south of the access road junction with the North Sunshine Ranch road. The work would be conducted within Western's existing right-of-way and easements on lands administered by the U.S. Department oflnterior

196

Forest Road Building Regulations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Forest Road Building Regulations Forest Road Building Regulations < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Schools Retail Supplier Institutional Fuel Distributor Nonprofit Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 09/2010 State Wisconsin Program Type Environmental Regulations The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading, stormwater, and

197

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

NLE Websites -- All DOE Office Websites (Extended Search)

CATEGORICAL EXCLUSION (CX) DETERMINATION CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28,2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of

198

Arozona and Imperial County. California RECORD OF CATEGORICAL EXCLUSION DETERMINATION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for access for access road maintenance. vegetation removal and structure maintenance at multiple structures along the eXisting G,'a-Knob 161-kV transmission line in Yuma County. Arozona and Imperial County. California RECORD OF CATEGORICAL EXCLUSION DETERMINATION: Amendment No. 1 A. Proposed Action: No changes B. Categorical Exclusion Applied: No changes C. Regulatory Requirements in 10 CFR 1021.410 fbI: No changes D. Determination: No changes E. Special Conditions: The following Special Conditions are added to those listed in the Categorical Exclusion dated 2nt11 . Updated maps are attached. 33. Avoid ground-disturbing activities between Structure 4/5 and 6thStreet. 34. Avoid ground-disturbing activities between Structures 417 and 4/8 . 35. Avoid ground disturbing activities between Structure 4/9 and a point 200 feet to

199

On-road remote sensing of vehicle emissions in  

E-Print Network (OSTI)

On-road remote sensing of vehicle emissions in the Auckland Region August 2003 Technical 1877353000 www.arc.govt.nz #12;TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region #12;Page i TP 198 On-Road Remote Sensing of Vehicle Emissions in the Auckland Region On-road remote sensing

Denver, University of

200

Rattlesnake Road Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Rattlesnake Road Wind Farm Rattlesnake Road Wind Farm Jump to: navigation, search Name Rattlesnake Road Wind Farm Facility Rattlesnake Road Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Developer Horizon Energy Purchaser Constellation Energy/PG&E Location Gilliam County west of Arlington OR Coordinates 45.700461°, -120.280581° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.700461,"lon":-120.280581,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

202

Overview of the ROADS'09 workshop  

Science Conference Proceedings (OSTI)

This report presents a brief overview of the organization and the program of the fourth Real Overlays and Distributed Systems Workshop ROADS'09 co-located with the 22nd SOSP conference at Big Sky, Montana.

Walid Dabbous; Maximilian Ott

2010-01-01T23:59:59.000Z

203

HCEI Road Map: 2011 Edition (Brochure)  

SciTech Connect

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

Braccio, R.; Finch, P.

2011-08-01T23:59:59.000Z

204

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE))

This road map outlines the 2011 key goals and strategies of the Hawaii Clean Energy Initiative, was founded based on a Memorandum of Understanding between the State of Hawaii and the U.S. Department of Energy in 2008.

205

The Silk Road Leads to the APS  

NLE Websites -- All DOE Office Websites (Extended Search)

The silk road leads to the APS Lori Khatchadourian (University of Michigan) and Adam Smith (The University of Chicago) switch sample mounts at the ChemMatCARS 15-ID-D beamline. The...

206

Access to the ALS  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to the ALS Print User Access The ALS experiment floor (Building 6) is a Controlled Access Area for radiation protection. All ALS users are required to register with the ALS...

207

CX-004076: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Categorical Exclusion Determination 76: Categorical Exclusion Determination CX-004076: Categorical Exclusion Determination East Omak Substation Fiber Project CX(s) Applied: B1.15 Date: 10/04/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration Okanogan Pubic Utility District proposes to bring fiber into the control house of Bonneville Power Administration?s (BPA) East Omak Substation (Substation) in Okanogan County, Washington. The Substation parcel, owned in fee by BPA, is located along Copple Road. The Substation can be accessed from Highway 97, which is located approximately 1,000 feet to the east of the Substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004076.pdf More Documents & Publications CX-008690: Categorical Exclusion Determination CX-008697: Categorical Exclusion Determination

208

CX-006304: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04: Categorical Exclusion Determination 04: Categorical Exclusion Determination CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace worn insulators along the 83-mile Grand Coulee-Bell No. 3 230 kilovolt (kV) double circuit transmission line. Work would be conducted on energized lines using live-line and bare-hand techniques as well as standard techniques requiring an outage. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006304.pdf More Documents & Publications CX-005379: Categorical Exclusion Determination CX-008704: Categorical Exclusion Determination

209

CX-006280: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-006280: Categorical Exclusion Determination Gore Pass Substation Pole Replacement CX(s) Applied: B1.3 Date: 07/01/2011 Location(s): Ground County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's Craig Field Office plans to replace pole 0/1 in-kind on the Gore Pass-Muddy Pass 69 kilovolt (kV) transmission line. The pole is approximately 60 feet outside the Gore Pass Substation fence and is located between two access roads. The area has considerable ongoing vehicle traffic and human activity. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006280.pdf More Documents & Publications CX-001652: Categorical Exclusion Determination CX-008793: Categorical Exclusion Determination

210

CX-005409: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5409: Categorical Exclusion Determination 5409: Categorical Exclusion Determination CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration Access road maintenance project near structure 38/2 of the Olympia-Grand Coulee Number 1 Transmission Line. Bonneville Power Administration proposes to maintain one double-culvert creek crossing on an unnamed stream. Work would include removing woody debris that is the result of beaver activity, and installing a beaver deterrent structure to exclude the beaver(s) from the culverts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005409.pdf More Documents & Publications CX-008679: Categorical Exclusion Determination CX-008687: Categorical Exclusion Determination

211

Capital Access Program (Vermont)  

Energy.gov (U.S. Department of Energy (DOE))

The Capital Access Program provides loan guarantees to small businesses seeking access to commercial credit. Premiums paid by the borrower and matched by Vermont Economic Development Authority fund...

212

CX-008789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

213

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

214

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

215

IRF-World Road Statistics | Open Energy Information  

Open Energy Info (EERE)

IRF-World Road Statistics IRF-World Road Statistics Jump to: navigation, search Tool Summary LAUNCH TOOL Name: IRF-World Road Statistics Agency/Company /Organization: International Road Statistics Focus Area: Transportation, Economic Development Resource Type: Dataset Website: www.irfnet.org/statistics.php Cost: Paid IRF-World Road Statistics Screenshot References: IRF-World Road Statistics[1] "IRF World Road Statistics (WRS) compiles the most up-to-date official international road, traffic and transport data. The publication further provides a selection of the latest Sustainable Development Indicators and other data of key relevance, not only to industry and business but also to leading international organisations and financial institutions." References ↑ "IRF-World Road Statistics"

216

Alaskan Ice Road Water Supplies Augmented by Snow Barriers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers March 6, 2013 - 10:55am Addthis Monitoring equipment and part of the snowfence peek out of the snow drift. Monitoring equipment and part of the snowfence peek out of the snow drift. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the

217

Alaskan Ice Road Water Supplies Augmented by Snow Barriers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers Alaskan Ice Road Water Supplies Augmented by Snow Barriers March 6, 2013 - 10:55am Addthis Monitoring equipment and part of the snowfence peek out of the snow drift. Monitoring equipment and part of the snowfence peek out of the snow drift. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. The aerial view shows the experimental lake at Franklin Bluffs used for the snowfence experiment. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the snow drift. Researcher Joel Bailey measures the density of the snow in this snow pit to determine the amount of snow in the drift and the water equivalent of the

218

Monitoring the recovery of decommissioned roads with citizen scientists in the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

monitoring following road decommissioning . Wildlands CPR,research on road decommissioning, which will in turn allowService. 2003. Road decommissioning monitoring report 2002.

Court, Katherine; Switalski, T. Adam; Broberg, Len; Lloyd, Rebecca

2005-01-01T23:59:59.000Z

219

Wildlife Use of Open and Decommissioned Roads on the Clearwater National Forest, Idaho  

E-Print Network (OSTI)

the effectiveness of road decommissioning (Switalski et al.hunting season. Road decommissioning has been recommended toresulting from road decommissioning has also been predicted

Switalski, T. Adam; Broberg, Len; Holden, Anna

2007-01-01T23:59:59.000Z

220

CX-007359: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

359: Categorical Exclusion Determination 359: Categorical Exclusion Determination CX-007359: Categorical Exclusion Determination McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to add six wooden prop structures to the McNary-Horse Heaven No. 1 230-kilovolt transmission line between structures 15/2-16/3. The prop structures are needed to raise the existing line so that the conductor meets the necessary Minimum Approach Distance from the orchard below. An augur truck would use existing BPA roads to access the site and install wooden poles. More Documents & Publications CX-006582: Categorical Exclusion Determination

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

CX-007135: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7135: Categorical Exclusion Determination 7135: Categorical Exclusion Determination CX-007135: Categorical Exclusion Determination Coolidge-Oracle Crossarm Replacement CX(s) Applied: B1.3 Date: 07/29/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct Emergency Crossarm Replacement at Structures 3/3 and 38/8 along the existing Coolidge-Oracle 115-kilovolt transmission line. We will use existing access roads and rubber tired vehicles such as pickup trucks, crew trucks, and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007135.pdf More Documents & Publications CX-004891: Categorical Exclusion Determination

222

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2011 August 24, 2011 CX-006776: Categorical Exclusion Determination Hills Creek-Lookout Point #1 Wood Pole and Access Road Maintenance CX(s) Applied: B1.3 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration August 24, 2011 CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management August 23, 2011 CX-007072: Categorical Exclusion Determination Install and Operate Chromate Water (CRW) Deionizer CX(s) Applied: B1.3 Date: 08/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management August 22, 2011 CX-006583: Categorical Exclusion Determination

223

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008982: Categorical Exclusion Determination "Sacrificial Protective Coating Materials Regenerated In-Situ to Enable High Performance Membranes CX(s) Applied: A9, B3.6 Date: 08/27/2012 Location(s): California Offices(s): Golden Field Office" August 25, 2012 CX-008918: Categorical Exclusion Determination Remove/Demolish T-20, T-14, T-15, T-29 CX(s) Applied: B1.23 Date: 08/25/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory August 24, 2012 CX-009412: Categorical Exclusion Determination 2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/24/2012 Location(s): California, California Offices(s): Western Area Power Administration August 24, 2012 CX-008927: Categorical Exclusion Determination

224

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-008918: Categorical Exclusion Determination Remove/Demolish T-20, T-14, T-15, T-29 CX(s) Applied: B1.23 Date: 08/25/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory August 24, 2012 CX-009412: Categorical Exclusion Determination 2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/24/2012 Location(s): California, California Offices(s): Western Area Power Administration August 24, 2012 CX-008927: Categorical Exclusion Determination Advanced Low Energy Enzyme Catalyzed Solvent for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 08/24/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory August 24, 2012 CX-008926: Categorical Exclusion Determination

225

CX-007129: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Categorical Exclusion Determination 9: Categorical Exclusion Determination CX-007129: Categorical Exclusion Determination Buck Boulevard Substation CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Ripley, California Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard Substation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. CX-007129.pdf More Documents & Publications CX-004875: Categorical Exclusion Determination

226

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 8, 2009 October 8, 2009 CX-000003: Categorical Exclusion Determination Interim Use of Scott Mountain Communications Site CX(s) Applied: B1.7, B1.19 Date: 10/08/2009 Location(s): Douglas County, Oregon Office(s): Bonneville Power Administration October 7, 2009 CX-000001: Categorical Exclusion Determination Routine Access Road Maintenance to the Rockdale Microwave Site CX(s) Applied: B1.3 Date: 10/07/2009 Location(s): King County, Washington Office(s): Bonneville Power Administration October 5, 2009 CX-004574: Categorical Exclusion Determination Kenaitze Tribe of Alaska Energy Efficiency Retrofits CX(s) Applied: A1, B2.5, B5.1 Date: 10/05/2009 Location(s): Kenaitze Tribe, Alaska Office(s): Energy Efficiency and Renewable Energy October 2, 2009 CX-006239: Categorical Exclusion Determination

227

CX-007134: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34: Categorical Exclusion Determination 34: Categorical Exclusion Determination CX-007134: Categorical Exclusion Determination Christmas Tree Pass Communication Site Antenna Re-alignment CX(s) Applied: B1.7 Date: 03/16/2011 Location(s): Clark County, Nevada Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to re-align the Christmas Tree to Davis antenna within the fenced area of the Christmas Tree Pass Communication Site, Clark County, Nevada. This work is necessary to maintain the safety and reliability of the bulk electrical system. Western will use existing access roads and vehicles such as pickup trucks & crew trucks to bring personnel and equipment to the work area. CX-007134.pdf More Documents & Publications CX-006896: Categorical Exclusion Determination

228

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 13, 2010 July 13, 2010 CX-003133: Categorical Exclusion Determination D-Zero Experiment Emergency Generator Fuel Tank Replacement Project CX(s) Applied: B1.3 Date: 07/13/2010 Location(s): Batavia, Illinois Office(s): Fermi Site Office, Science July 12, 2010 CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003137: Categorical Exclusion Determination Repairs to West Hackberry Building 301 Roof CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): West Hackberry, Louisiana Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office July 12, 2010 CX-002979: Categorical Exclusion Determination Oregon Energy Efficiency and Conservation Block Grant Formula - City of

229

End of the road for Roadrunner  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner End of the road for Roadrunner End of the road for Roadrunner Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. March 29, 2013 Roadrunner, the first supercomputer to break the once-elusive petaflop barrier-one million billion calculations per second-will be decommissioned on Sunday, March 31. Roadrunner will be decommissioned on March 31. Contact Kevin Roark Communications Office (505) 665-9202 Email Roadrunner got everyone thinking in new ways about how to build and use a supercomputer. Once the World's Fastest Supercomputer; Central to the Success of Stockpile Stewardship LOS ALAMOS, N. M., March 29, 2013-Roadrunner, the first supercomputer to

230

Pinal COunty, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25/3 25/3 maintenance along the existing Rogers- Coolidge 230-kV transmission line in Pinal COunty, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace damaged structure foundation and leg extension at structure 25/3 along the existing Rogers-Coolidge 230-kV transmission line. This will include providing temporary bracing to the structure, placing it on a steel plate laying across the surface of the ground during removal and replacement of the damaged leg and replacing the foundation, reinforced steel and associated hardware. The foundation replacement will occur within a 20-foot-wide x 20-foot-long x 10-foot-deep area. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain

231

Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53/6 53/6 maintenance along the existing Casa Grande-Saguaro 115-kV transmission line Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace crossarms at structure 53/6 of its Casa Grande-Saguaro 115-kV transmission line, within Western's existing right-of- way. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area on private land situated within Section 13 Township 10 South Range 9 East on the Gila & Salt River Meridian, Pinal County, Arizona. Corresponding U.S.G.S. 7.5-minute topographic is Samaniego Hills, Arizona. This work is planned to begin the week of December 27,2010.

232

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

233

Maricopa County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance maintenance on 19 structures of the existing Liberty- Coolidge 230-kV transmission line in Maricopa County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct vegetation removal and maintenance at structures 2/1, 3/3, 3/5, 10/2, 13/5, 17/5, 18/5, 20/2, 20/3, 22/4, 22/8, 23/2,23/3,24/1,24/3,33/6,51/2,5413 & 56/3 of the existing Liberty-Coolidge 230- kV transmission line. This work will consist of replacing bad structure poles, ground wires and anchors, crossarms & cross braces, insulators, conductors and hardware. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

234

An access control model for dynamic client-side content  

Science Conference Proceedings (OSTI)

The focus of access control in client/server environments is on protecting sensitive server resources by determining whether or not a client is authorized to access those resources. The set of resources are usually static, and an access control policy ... Keywords: access control, authentication, credentials, trust negotiation

Adam Hess; Kent E. Seamons

2003-06-01T23:59:59.000Z

235

CX-001125: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Blading of Washed Out Access Road and Repairing the Washed Out Area Inside the Substation FenceCX(s) Applied: B1.3Date: 11/12/2009Location(s): Mohave County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

236

HCEI Road Map: 2011 Edition (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Road Map Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

237

HCEI Road Map: 2011 Edition (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

HCEI Road Map HCEI Road Map 2011 Edition 2 www.hawaiicleanenergyinitiative.org The Hawaii Clean Energy Initiative (HCEI) was founded based on a Memorandum of Understanding (MOU) between the State of Hawaii and the U.S. Department of Energy on Jan. 28, 2008. Upon inception, the State and the Department worked to form a series of working groups incorporating a variety of stakeholders throughout the state, including local government, not-for-profit organizations, private sector companies, trade associations, Department of Defense representatives (including PACOM) and academic organizations, among others. These working groups form

238

Utility Data Accessibility Map | Open Energy Information  

Open Energy Info (EERE)

Utility Data Accessibility Map Utility Data Accessibility Map Jump to: navigation, search Residential Commercial Benchmarking Energy Efficiency Delivery of Data Time Period Frequency of Data Access to Data Residential frequency of data access Ua Utility Data Access Map Having access to your electricity use data is a very important step in understanding your overall energy usage. Comparing historical data to your current usage is one way to see trends and determine ways for reducing electricity costs and improving overall efficiency. We asked all U.S. electric utility companies to tell us how accessible their electricity use data is for both residential and commercial customers. The results are updated live based on the responses we have to date. As more utilities provide information, the utility boundaries will be automatically colored

239

Web accessible image similarity measurements  

Science Conference Proceedings (OSTI)

Web accessible image similarity measurements. Background: There ... messages). Web Access to Image Similarity Measurements. ...

2013-04-16T23:59:59.000Z

240

Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Road User Assessment System Pilot to someone by E-mail Road User Assessment System Pilot to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Road User Assessment System Pilot on AddThis.com... More in this section... Federal State Advanced Search

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Classified road detection from satellite images based on perceptual organization  

Science Conference Proceedings (OSTI)

Extracting roads from satellite images is an important task in both research and practice. This work presents an improved model for road detection based on the principles of perceptual organization and classification fusion in human vision system (HVS). ...

J. Yang; R. S. Wang

2007-10-01T23:59:59.000Z

242

Template Discontinuation Access  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR SUBJECT FOR SUBJECT FROM: Personnel Security Program Manager SUBJECT: Discontinuation of Access Eligibility Determination Reference is made to your Questionnaire for National Security Positions signed on [insert date], which was forwarded to this office in connection with a Department of Energy security clearance request. A review of that form disclosed recent use of illegal drugs. [Insert a brief description of the circumstances such as: Specifically, you listed marijuana use 1 time in 5/02; 1 time in 2/03; and 1 time in 3/07.] This office has discontinued the personnel security processing of your security clearance due to your illegal drug usage within twelve months of the signing of your security clearance application.

243

Loss of Cherished Places -- Place Character and Climate Change along Australia's Great Ocean Road  

E-Print Network (OSTI)

Change along Australias Great Ocean Road Ray Green The paceStudies along the Great Ocean Road The research discussedplace along Australias Great Ocean Road. 5 The road, in the

Green, Ray

2008-01-01T23:59:59.000Z

244

The State of the Region HAMPTON ROADS 2011  

E-Print Network (OSTI)

and Frank Batten Jr. Foundation Hampton Roads Chamber of Commerce R. Bruce Bradley Kaufman and Canoles Ramon

245

Campus Security 1951 East-West Road  

E-Print Network (OSTI)

Campus Security 1951 East-West Road Honolulu, Hawai`i 96822 Telephone: (808) 956-9293 Fax: (808 First Female Campus Security Captain Alberta J.K. Pukahi Brings Unique Perspectives to the Position (HONOLULU, HI, December 10, 2012) University of Hawai`i at Mnoa's Campus Security and Emergency Management

246

Road traffic model using distributed camera network  

Science Conference Proceedings (OSTI)

Traffic monitoring/prediction using a distributed camera network is presented in this paper. The activities on each road link are monitored and features are derived to identify the pattern. Then it is learnt, classified, predicted and communicated to ... Keywords: hidden Markov model, spatial interest points, spatial-temporal interest points, traffic classification, traffic prediction, traffic surveillance

S. Indu; Sankalp Arora; Santanu Chaudhury; Asok Bhattacharyya

2010-12-01T23:59:59.000Z

247

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

vegetation removal betweeen vegetation removal betweeen structures 0/3 and 0/4, liS and 1/6, 3/1 and 3/2, 412 and 4/3, a round structure 418, between structures S/l and S/2 and around structure S/4 along the existing Saguaro -Oracle 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kV transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down

248

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may only be used on roads that have a posted speed limit

249

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may only operate on private and public roads and streets

250

Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Low-Speed Vehicle Low-Speed Vehicle Access to Roadways to someone by E-mail Share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Facebook Tweet about Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Twitter Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Google Bookmark Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Delicious Rank Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on Digg Find More places to share Alternative Fuels Data Center: Low-Speed Vehicle Access to Roadways on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Low-Speed Vehicle Access to Roadways Low-speed vehicles may not operate on roads with posted speed limits of

251

The Atlantic Richfield Company Black Thunder mine haul road dust study. [Wyoming  

Science Conference Proceedings (OSTI)

An examination of the effectiveness of various haul road dust control measures was performed at ARCO's Black Thunder Mine near Wright, Wyoming by evaluating both visible observations and quantitative measurements of particle concentrations. In order to evaluate dust control effectiveness both a 300 foot (91.5 meter) and 175 foot (53.4 meter) section of the main coal haul road was selected for testing. The test sections were separated by a 200 foot (61 meter) buffer zone. Each test section was relatively straight and away from interferences from other mine sources. The five haul road treatment test sequences evaluated for control measure effectiveness were: an untreated road segment; water treatment two times per hour; water treatment four times per hour; previously chemically treated segment of haul road (ARCO 2400 dust suppressant); and testing after application of Coherex (10% dilution). By comparing uncontrolled situations with various controlled situations, an estimate of the control efficiency of the dust control measures was determined. Based upon the results of the study a fugitive dust control scheme was selected considering control effectiveness, economics and operational efficiency.

Maxwell, D.R.; Hormel, T.R.; Ives, J.A.

1982-06-01T23:59:59.000Z

252

Hierarchy decomposition for faster user equilibria on road networks  

Science Conference Proceedings (OSTI)

The road traffic of an entire day for a certain region can be understood as a flow with sources and sinks on the road network. Traffic has the tendency to evade regularly clogged roads and other bottlenecks, especially with modern on-board navigation ...

Dennis Luxen; Peter Sanders

2011-05-01T23:59:59.000Z

253

Studying (non-planar) road networks through an algorithmic lens  

Science Conference Proceedings (OSTI)

This paper studies real-world road networks from an algorithmic perspective, focusing on empirical studies that yield useful properties of road networks that can be exploited in the design of fast algorithms that deal with geographic data. Unlike previous ... Keywords: Voronoi diagrams, algorithmic lens, circle arrangements, disk neighborhood systems, multiscale-dispersed graphs, road networks, shortest paths

David Eppstein; Michael T. Goodrich

2008-11-01T23:59:59.000Z

254

County, Nevada RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

antenna re-alignment antenna re-alignment within the fenced area of the Christmas Tree Pass Communication Site, located in Clark County, Nevada RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to re-align the Christmas Tree to Davis antenna within the fenced area of the Christmas Tree Pass Communication Site, Clark County, Nevada. This work is necessary to maintain the safety and reliability of the bulk electrical system. Western will use existing access roads and vehicles such as pickup trucks & crew trucks to bring personnel and equipmentto the work area. The attached map shows the project area location. The legal description is Section 17 Township 31 South, Range 65 East on the Mt. Diablo Meridian (USGS Spirit Mountain, Nevada 7.5' maps). This work is planned to be completed by December 31, 2011.

255

County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

electrical equipment electrical equipment replacementat Gila Substation in Yuma County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace a 34.5-kV circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads and vehicles such as backhoes, dozers, bucket trucks, crew trucks and pickup trucks to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk electrical system . The attached map shows the project area location. The legal description is Section

256

RECORD OF CATEGORICAL EXCLUSION DETERMINATION A  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

infrastructure infrastructure replacementalong the existing ED4-ED5 transmission line in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A . Proposed Action: Western proposes to replace 9.2 miles of 115-kV wood H-frame structures with 230-kV double-circuit steel monopoles and the existing conductor with a single circuit of 1272 kcmil ACSS. The second circuit will not be installed as a part of this project. The rebuild will include new hardware and insulators as well as one optical groundwire (OPGW) for the entire length of the line. Western will use existing access roads to bring personnel and equipment to the work area. The new lines will be designed to accommodate growth in the area by providing additional clearances from encroachments. Work will be conducted within Western's 100-foot

257

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

trenching of conduit trenching of conduit within the fenced area of the Signal Tap Substation (SIG) located in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to trench a 2-inch conduit from Electrica l District No. 2's Signal Substation yard to Western's Signal Tap Substation yard and terminate on the north side of Western's control building. The trenching will be a minimum of 18 inches deep and approximately 3 feet wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. The attached map shows the project area location. The legal description is Section 6

258

Microsoft Word - CX-Satsop-Aberdeen roads FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Jim Semrau Project Manager - TELF-TPP-3 Proposed Action: Maintenance of access roads serving the Satsop-Aberdeen No. 2 and No. 3, and the Aberdeen Tap to South Elma-Cosmopolis transmission lines PP&A Project No.: 1697 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington, between the towns of

259

CX-006595: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95: Categorical Exclusion Determination 95: Categorical Exclusion Determination CX-006595: Categorical Exclusion Determination Routine Monitoring and Maintenance, Sherwood, Washington, Disposal Site CX(s) Applied: B1.3, B1.11, B3.1 Date: 08/29/2011 Location(s): Sherwood, Washington Office(s): Legacy Management Routine monitoring and maintenance actions, general site and administrative actions. Site inspections include access via existing roads, walking or driving on the site, use of equipment to conduct the inspection of the entire site. Routine monitoring includes on and off-site sampling of surface water, groundwater, cell cover, and vegetation control. Maintenance includes repainting identification numbers, fixing locks, replacing signs, vegetation management, small scale erosion control, operation, maintenance,

260

CX-007751: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Categorical Exclusion Determination 1: Categorical Exclusion Determination CX-007751: Categorical Exclusion Determination Routine Monitoring, Maintenance, General Site Actions, Non-routine Actions, and Administrative Actions at the Falls City, Texas, Disposal Site CX(s) Applied: B1.3, B3.1 Date: 01/18/2012 Location(s): Texas Offices(s): Legacy Management Routine monitoring and maintenance actions, general site and administrative actions. Annual site inspections include access via existing roads, walking or driving on the site, and use of equipment to conduct the inspection of the entire 231 acres. Routine actions include on and off-site environmental monitoring and sampling of groundwater, cell cover material including riprap rock and vegetation, and may be research related. Monitoring equipment calibration and maintenance laboratory analysis, and the

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CX-004456: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Categorical Exclusion Determination 456: Categorical Exclusion Determination CX-004456: Categorical Exclusion Determination Boysen-Copper Mountain Structure 98/1 Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3, B4.6 Date: 11/10/2010 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace Structure 98/1 and conduct access road maintenance on Western's existing Boysen-Copper Mountain 115 kilovolt transmission line in Fremont County, Wyoming. Structure 98/1 is located on United States (US) Bureau of Reclamation land in the southeast 1/4 of Section 16, T. 5 north, R. 6 east, of the Wind River meridian, Wyoming near the Boysen State Park Headquarters. A cleared, level area (landing) will be constructed around the base of structure 98/1 for better equipment

262

CX-006832: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Categorical Exclusion Determination 32: Categorical Exclusion Determination CX-006832: Categorical Exclusion Determination Routine Monitoring, Maintenance, General Site Actions, Non-Routine Actions, and Administrative Actions at the Cannonsburg, Pennsylvania, Disposal Site CX(s) Applied: B1.3, B3.1 Date: 09/15/2011 Location(s): Cannonsburg, Pennsylvania Office(s): Legacy Management Routine monitoring and maintenance actions, general site and administrative actions at the Cannonsburg, Pennsylvania Disposal Site. Annual site inspections include access via existing roads, walking or driving on the site, and use of equipment to conduct the inspection of the entire 34.2 acres. Routine actions include on and off-site environmental monitoring and sampling of groundwater, cell cover material including riprap rock, and

263

CX-007170: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70: Categorical Exclusion Determination 70: Categorical Exclusion Determination CX-007170: Categorical Exclusion Determination Saguaro-Tucson Vegetation Removal CX(s) Applied: B1.3 Date: 03/30/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kilovolt transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007170.pdf More Documents & Publications

264

CX-007160: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Categorical Exclusion Determination 60: Categorical Exclusion Determination CX-007160: Categorical Exclusion Determination Pinnacle Peak Substation Coupling Capacitor Voltage Transformer Installation CX(s) Applied: B4.6 Date: 05/10/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on installing a new 230-kilovolt coupling capacitor voltage transformer within the fenced area of the Pinnacle Peak Substation. This will also consist of, modifying the existing foundation structure & installing conduit & control cable in a trench to the control building. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of

265

CX-003193: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93: Categorical Exclusion Determination 93: Categorical Exclusion Determination CX-003193: Categorical Exclusion Determination Davis Dam 230-Kilovolt Switchyards Stage 06 Upgrade (Double Breaker Double Bus) in Mohave County, Arizona CX(s) Applied: B4.11 Date: 06/30/2010 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration plans to upgrade the existing Upper and Lower Davis Dam 230-kilovolt switchyards in order to provide additional operational flexibility and reliability to the bulk electric system. Construction activities will take place within the existing switchyard fences in areas previously graded and covered with gravel. Existing gravel access roads will be used to reach the project area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

266

CX-006313: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-006313: Categorical Exclusion Determination Cascade Networks, Inc. Land Use Review Request at Allston Substation CX(s) Applied: B1.7, B4.7 Date: 07/15/2011 Location(s): Columbia County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant Cascade Networks, Inc. permission to install fiber conduit within BPA fee-owned land adjacent to Allston Substation located in Columbia County, Oregon. Currently, independent fiber optic cables approach BPA?s Allston Substation from two directions. From the east, fiber cable from BPA?s Longview Substation located in Longview, Washington terminates at a customer vault (CV) located adjacent to Allston Substation?s access road. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

267

CX-009227: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) replaced approximately 55 structures on an existing l 0 mile section of the 115-k V transmission line between Beaver Creek and Big Sandy Substations in Washington County, Colorado. The Last Chance fire which began on June 25, 2012, destroyed the existing structures beyond repair. Western crews responded to this emergency and rebuilt the downed power lines to restore electrical service. The maintenance crews used existing access roads and no grading or

268

CX-005845: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5845: Categorical Exclusion Determination 5845: Categorical Exclusion Determination CX-005845: Categorical Exclusion Determination Selected Wood Pole Replacement and Minor Access Road Maintenance Along the Grand Coulee-Creston Transmission Line at Miles 14, 15, 21 and 28 CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the Grand Coulee-Creston #1 115-kilovolt transmission line. The structures scheduled for replacement are identified as 14/6, 14/8, 15/1, 21/9 and 28/7. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance.

269

CX-007171: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71: Categorical Exclusion Determination 71: Categorical Exclusion Determination CX-007171: Categorical Exclusion Determination Signal Tap Substation CX(s) Applied: B4.6 Date: 09/09/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to trench a 2-inch conduit from Electrical District No. 2's Signal Substation yard to Western's Signal Tap Substation yard and terminate on the north side of Western's control building. The trenching will be a minimum of 18 inches deep and approximately 3 feet wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. CX-007171.pdf More Documents & Publications

270

CX-004644: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44: Categorical Exclusion Determination 44: Categorical Exclusion Determination CX-004644: Categorical Exclusion Determination Research Support Facility II, Cafeteria; National Renewable Energy Laboratory Tracking Number 11-003 CX(s) Applied: B1.15, B5.1 Date: 12/10/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The project would consist of a one- or two-story building of approximately 12,000 square feet with an 8,000 square foot footprint and 4,000 square foot mezzanine and outside seating area. With infrastructure, excavation, work areas, laydown areas, and spoils piles the disturbance area is estimated at approximately 20,000 square feet (8,000 building + 4,000 mezzanine and outside seating + 4,000 spoils + 4,000 road access and laydown areas). The rooftop may incorporate a seating area, photovoltaic

271

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-003204: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act EE-0000169 CX(s) Applied: B5.1 Date: 08/03/2010 Location(s): Richmond, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 3, 2010 CX-004909: Categorical Exclusion Determination University of Notre Dame - Compact, Efficient Air Conditioning with Ionic Liquid Based Refrigerant CX(s) Applied: B3.6 Date: 08/03/2010 Location(s): LaGrange, Indiana Office(s): Advanced Research Projects Agency - Energy August 2, 2010 CX-007163: Categorical Exclusion Determination Pinnacle Peak-Prescott Access Road Improvement CX(s) Applied: B1.3 Date: 08/02/2010 Location(s): Yavapai County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

272

CX-004252: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Categorical Exclusion Determination 52: Categorical Exclusion Determination CX-004252: Categorical Exclusion Determination Replace Two Broken Transformers Near the Roza Dam Adult Trap Facility CX(s) Applied: B4.6 Date: 10/13/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace two broken transformers at the Roza Diversion Dam adult trap facility. The transformers are on an existing access road about 30 feet from the facility. The replacement will be in-kind. All of the work will be done above ground in a previously disturbed area. The work will be completed by using a bucket truck and a 10-ton or smaller crane to remove the old transformers and install the new ones. A one-ton pickup will be used to

273

Categorical Exclusion Determinations: B1.22 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 Categorical Exclusion Determinations: B1.22 Existing Regulations B1.22: Relocation of buildings Relocation of buildings (including, but not limited to, trailers and prefabricated buildings) to an already developed area (where active utilities and currently used roads are readily accessible). DOCUMENTS AVAILABLE FOR DOWNLOAD November 23, 2009 CX-000322: Categorical Exclusion Determination Kentucky Revision 2 - Green Bank of Kentucky Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 23, 2009 CX-000320: Categorical Exclusion Determination Kentucky Revision 2 - Kentucky Farm Energy Efficiency and Renewable Energy Partnership CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.24,

274

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration March 12, 2010 CX-001147: Categorical Exclusion Determination Implementation of Process Simulation Tools and Temperature Control Methods for Metal Oxide Chemical Vapor Deposition Growth CX(s) Applied: B3.6 Date: 03/12/2010 Location(s): Somerset, New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 12, 2010 CX-001182: Categorical Exclusion Determination Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line CX(s) Applied: B1.13 Date: 03/12/2010 Location(s): Snohomish, Washington

275

CX-007141: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07141: Categorical Exclusion Determination 07141: Categorical Exclusion Determination CX-007141: Categorical Exclusion Determination Electrical District 4 - Electrical District 5 - Structure Replacement CX(s) Applied: B4.6 Date: 09/01/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace 9.2 miles of 115-kilovolt (kV) wood H-frame structures with 230-kV double-circuit steel monopoles and the existing conductor with a single circuit of 1272 kcmil ACSS. The second circuit will not be installed as a part of this project. The rebuild will include new hardware and insulators as well as one optical ground wire (OPGW) for the entire length of the line. Western will use existing access roads to bring personnel and equipment to the work area. The new lines will be designed to

276

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009 2, 2009 CX-001125: Categorical Exclusion Determination Blading of Washed Out Access Road and Repairing the Washed Out Area Inside the Substation Fence CX(s) Applied: B1.3 Date: 11/12/2009 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region November 12, 2009 CX-000383: Categorical Exclusion Determination Cemex Commercial-Scale Carbon Dioxide Capture and Sequestration for the Cement Industry CX(s) Applied: A1, A9, B3.1 Date: 11/12/2009 Location(s): Odessa, Texas Office(s): Fossil Energy, National Energy Technology Laboratory November 12, 2009 CX-000382: Categorical Exclusion Determination Cemex Commercial-Scale Carbon Dioxide Capture and Sequestration for the Cement Industry CX(s) Applied: A1, A9, B3.6 Date: 11/12/2009

277

CX-007148: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-007148: Categorical Exclusion Determination Gila Substation Electrical Equipment Replacement CX(s) Applied: B4.6 Date: 05/03/2011 Location(s): Yuma County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace a 34.5-kilovolt (kV) circuit breaker within the fenced area of Gila Substation. This will consist of removing the existing 34.5-kV circuit breaker and foundation, trenching to add control cables and conduit to the control building, laying a new foundation and adding a new 34.5-kV circuit breaker. Western will be using existing access roads and vehicles such as backhoes, dozers, bucket trucks, crew trucks and pickup trucks to bring personnel and equipment to the work areas. This work is

278

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 4, 2013 April 4, 2013 CX-010095: Categorical Exclusion Determination Casa Grande Substation, CAG 262 Breaker Replacement CX(s) Applied: B1.3 Date: 04/04/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

279

CX-007162: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

162: Categorical Exclusion Determination 162: Categorical Exclusion Determination CX-007162: Categorical Exclusion Determination Pinnacle Peak Substation Electrical Equipment Removal CX(s) Applied: B1.17 Date: 05/09/2011 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes drain and dispose of polychlorinated biphenyl (PCB) contaminated oil from two bushings, and decontaminate one? bushing and rack, break apart PCB contaminated concrete and excavate PCB contaminated soil at Pinnacle Peak Substation. Western will be use existing access roads and vehicles such as cranes, backhoes, dozers, bucket trucks, crew trucks and pickup trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk

280

CX-006776: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Categorical Exclusion Determination 76: Categorical Exclusion Determination CX-006776: Categorical Exclusion Determination Hills Creek-Lookout Point #1 Wood Pole and Access Road Maintenance CX(s) Applied: B1.3 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission line at various locations. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole placement. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006776.pdf More Documents & Publications

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CX-003193: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3193: Categorical Exclusion Determination 3193: Categorical Exclusion Determination CX-003193: Categorical Exclusion Determination Davis Dam 230-Kilovolt Switchyards Stage 06 Upgrade (Double Breaker Double Bus) in Mohave County, Arizona CX(s) Applied: B4.11 Date: 06/30/2010 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration plans to upgrade the existing Upper and Lower Davis Dam 230-kilovolt switchyards in order to provide additional operational flexibility and reliability to the bulk electric system. Construction activities will take place within the existing switchyard fences in areas previously graded and covered with gravel. Existing gravel access roads will be used to reach the project area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

282

CX-007167: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

167: Categorical Exclusion Determination 167: Categorical Exclusion Determination CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to cut down four Palo Verde trees using hand tools, under our existing Rogers-Coolidge 230-kilovolt transmission line, within Western's existing right-of-way between Structures 35/4 and 36/2 on the Gila River Indian Reservation, Pinal County, Arizona. Western will be using pickup trucks along the existing access road located west of the transmission line to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk

283

CX-001121: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

121: Categorical Exclusion Determination 121: Categorical Exclusion Determination CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Relocate part of Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion. This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within within Western's right-of-way. Western will be using existing access roads and vehicles such as an auger, pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and

284

CX-007146: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

46: Categorical Exclusion Determination 46: Categorical Exclusion Determination CX-007146: Categorical Exclusion Determination Flagstaff & Pinnacle Peak Communication Site Building Demolition CX(s) Applied: B1.23 Date: 08/25/2011 Location(s): Coconino and Maricopa Counties, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove communication buildings and associated items from the Flagstaff and Pinnacle Peak substations, because they no longer meet our needs and we do not anticipate finding a use for it in the future. This will consist of demolishing buildings and removing communication towers from both locations. The buildings are presently vacant. Western will use crew trucks and pickup trucks along existing access roads to bring personnel and equipment to the work area.

285

CX-007126: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-007126: Categorical Exclusion Determination CX-007126: Categorical Exclusion Determination CX-007126: Categorical Exclusion Determination Basic Substation Phase 2 Soil Remediation CX(s) Applied: B6.1 Date: 03/10/2011 Location(s): Henderson, Nevada Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to excavate polychlorinated biphenyl and total petroleum hydrocarbon-contaminated soils within the Basic Substation yards 1, 2 and 3 as well as the T9 and T10 areas as well as remove asbestos wrapped pipe and conduit. Western will also be removing creosote-contaminated railroad ties. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and dump trucks. This work is necessary to maintain sanitary and safe working conditions. CX-007126.pdf

286

CX-006824: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006824: Categorical Exclusion Determination Routine Monitoring, Maintenance, General Site Actions, Non-Routine Actions, and Administrative Actions at the Parkersburg, West Virginia, Disposal Site CX(s) Applied: B1.3, B3.1 Date: 09/15/2011 Location(s): Parkersburg, West Virginia Office(s): Legacy Management, Golden Field Office Routine monitoring and maintenance actions, general site and administrative actions at the Parkersburg, West Virginia, Disposal Site. Annual site inspections include access via existing roads, walking or driving on the site, and use of equipment to conduct the inspection of the entire 15 acres. Routine actions include on and off-site environmental monitoring and sampling of groundwater and vegetation, and may be research related.

287

CX-005410: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

410: Categorical Exclusion Determination 410: Categorical Exclusion Determination CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road reconstruction work to improve vehicle access to structures 16/6, 16/7 and 17/1 of the North Bonneville-Alcoa Number 1 and 2 transmission line corridor from southeast 37th Street to the right-of-way, then to structure 16/6 to the east, and structure 17/1 to the west. The total distance of this project is approximately 2200 feet. Project work may include, but is not limited to: vegetation removal to clear a 20-foot width, grading and

288

CX-006247: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-006247: Categorical Exclusion Determination Relocation of Bayou Choctaw Helipad CX(s) Applied: B1.3 Date: 06/13/2011 Location(s): Iberville Parish, Louisiana Office(s): Strategic Petroleum Reserve Field Office Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision required to perform the relocation of the helipad at Bayou Choctaw. Tasks include surface preparation; construction of reinforced concrete landing surface, asphaltic paved safety zone and access road; seeding outside slopes and exposed surfaces; installation of helipad perimeter lighting; painting of perimeter markings; construction of concrete foundation for windsock; installation of windsock; and painting closure markings at existing

289

CX-007161: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61: Categorical Exclusion Determination 61: Categorical Exclusion Determination CX-007161: Categorical Exclusion Determination Pinnacle Peak Substation Conductor & Circuit Breaker Replacement CX(s) Applied: B4.6 Date: 12/03/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes on replacing 230-kilovolt (kV) conductor in four bays and one 230-kV power circuit breaker voltage transformer within the fenced area of the Pinnacle Peak Substation, This will also consist of rerouting existing conduit in a 20 foot trench going 24 inches in depth. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the

290

CX-004876: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4876: Categorical Exclusion Determination 4876: Categorical Exclusion Determination CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilowatt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the

291

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 CX-010418: Categorical Exclusion Determination Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region May 20, 2013 CX-010523: Categorical Exclusion Determination Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs CX(s) Applied: A9, B3.1, B3.6 Date: 05/20/2013 Location(s): Utah Offices(s): Golden Field Office May 20, 2013 CX-010407: Categorical Exclusion Determination Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line Access Road Maintenance between Structure 26/8 and 26/9 CX(s) Applied: B1.3 Date: 05/20/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

292

CX-005846: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

846: Categorical Exclusion Determination 846: Categorical Exclusion Determination CX-005846: Categorical Exclusion Determination Wood Pole Replacement and Minor Access Road Maintenance Along Various Transmission Line Rights-Of-Way in the Wenatchee District CX(s) Applied: B1.3 Date: 05/04/2011 Location(s): Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission line. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole placement. New landing construction is not planned or anticipated at these locations.

293

Categorical Exclusion Determinations: B1.22 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B1.22 Existing Regulations B1.22: Relocation of buildings Relocation of buildings (including, but not limited to, trailers and prefabricated buildings) to an already developed area (where active utilities and currently used roads are readily accessible). DOCUMENTS AVAILABLE FOR DOWNLOAD August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 20, 2013 CX-010418: Categorical Exclusion Determination Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming

294

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-002372: Categorical Exclusion Determination Building 17 and 19 Utility Meter Install CX(s) Applied: B1.15, B2.2 Date: 05/10/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory May 10, 2010 CX-007160: Categorical Exclusion Determination Pinnacle Peak Substation Coupling Capacitor Voltage Transformer Installation CX(s) Applied: B4.6 Date: 05/10/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region May 10, 2010 CX-007155: Categorical Exclusion Determination Mead-Perkins Avian Nest Removal & Access Road Maintenance CX(s) Applied: B1.3 Date: 05/10/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

295

CX-004875: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-004875: Categorical Exclusion Determination Buck Boulevard Substation (Conduit Addition) CX(s) Applied: B4.6 Date: 11/23/2010 Location(s): Riverside County, California Office(s): Bonneville Power Administration Western proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard Substation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004875.pdf More Documents & Publications

296

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

297

Radiological survey results at 4400 Piehl Road, Ottawa Lake, Michigan  

SciTech Connect

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at 4400 Piehl Road in Ottawa Lake, Michigan. The survey was performed in September, 1992. The purpose of the survey was to determine if materials containing uranium from work performed under government contract at the former Baker Brothers facility in Toledo, Ohio had been transported off-site to this neighboring area. The radiological survey included surface gamma scans indoors and outdoors, alpha and beta scans inside the house and attached garage, beta-gamma scans of the hard surfaces outside, and the collection of soil, water, and dust samples for radionuclide analyses. Results of the survey demonstrated that the majority of the measurements on the property were within DOE guidelines. However, the presence of isolated spots of uranium contamination were found in two areas where materials were allegedly transported to the property from the former Baker Brothers site. Uranium uptake by persons on the property by ingestion is fairly unlikely, but inhalation is a possibility. Based on these findings, it is recommended that the residential property at 4400 Piehl Road in Ottawa Lake, Michigan be considered for inclusion under FUSRAP.

Foley, R.D.; Johnson, C.A.

1993-04-01T23:59:59.000Z

298

Timber Road II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Timber Road II Facility Timber Road II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser American Electric Power Location Near Payne OH Coordinates 41.023524°, -84.717185° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.023524,"lon":-84.717185,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

299

EPA Energy Strategy For The Road Ahead  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy Strategy for the Road Ahead Scenario Thinking for Business Executives and Corporate Boards 2007 GBN Global Business Network * Energy Strategy for the Road Ahead Printed on 100% recycled paper Copyright 2007 Global Business Network, a member of the Monitor Group. The U.S. Environmental Protection Agency (U.S. EPA) and its ENERGY STAR ® Program supported this effort. We encourage readers to use and share the content of this report, with the understanding that it is the intellectual property of Global Business Network and U.S. EPA ENERGY STAR ® , and that full attribution is required. 101 Market Street, Suite 1000 * San Francisco, CA 94105 * Telephone: (415) 932-5400 * Fax: (415) 932-5401

300

Early Cook County Roads -- Part Two  

NLE Websites -- All DOE Office Websites (Extended Search)

Two Two Nature Bulletin No. 739 January 18, 1964 Forest Preserve District of Cook County Seymour Simon, President Roberts Mann, Conservation Editor EARLY COOK COUNTY ROADS -- PART TWO -- THE PLANK ROAD ERA For ten years after Chicago, with a population of 4,170, was chartered as a city in 1837, its commerce and growth were crippled by wretched transportation to and from the hinterlands. During many periods of each year it was surrounded and isolated by mud. To be sure, there were dirt thoroughfares in all directions, graded and drained as best they could in those days, but not surfaced. No one who has never experienced it can appreciate how gooey and gluey a black prairie soil can be when wet. A wagon's wheels often become solid cylinders of mud as wide as a bass drum.

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A road map for implementing systems engineering  

SciTech Connect

Studies by academia, industry, and government indicate that applying a sound systems engineering process to development programs is an important tool for preventing cost and schedule overruns and performance deficiencies. There is an enormous body of systems engineering knowledge. Where does one start? How can the principles of systems engineering be applied in the Sandia environment? This road map is intended to be an aid to answering these questions.

Dean, F.F. [Sandia National Labs., Albuquerque, NM (United States). New Mexico Weapons Systems Engineering Center; Bentz, B.; Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States)

1997-02-01T23:59:59.000Z

302

Access Grid - CECM  

E-Print Network (OSTI)

"The Access Grid (AG) is the ensemble of resources that can be used to support ... We shall also illustrate the basic capture capacities that Smart Technology's...

303

Science Open Access Journals  

Office of Scientific and Technical Information (OSTI)

SOAJ allows the user to search multiple open access publications with a single query. Results are consolidated and returned in relevance-ranked order, and users are...

304

Role Based Access Control  

Science Conference Proceedings (OSTI)

... Nash and Poland [10] discuss the application of role based access control to cryptographic authentication devices commonly used in the banking ...

305

Making VRML Accessible  

Science Conference Proceedings (OSTI)

... Paper - Making VRML Accessible for People with Disabilities by Sandy Ressler and Qiming Wang to Appear in Proceeding of ASSETS 98. ...

306

CX-001228: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

228: Categorical Exclusion Determination 228: Categorical Exclusion Determination CX-001228: Categorical Exclusion Determination Laurel Road Pole Relocation, Laurel Road and Rose Avenue (18/3) - Addendum to Laurel Road Pole Relocation Brown Road to Woodhill Drive (18/13-19/3) CX(s) Applied: B4.13 Date: 03/08/2010 Location(s): Oakley, California Office(s): Western Area Power Administration-Sierra Nevada Region The City of Oakley in Contra Costa County is continuing to work on expanding Laurel Road for future development plans. Development of the area has been delayed; however Oakley is experiencing deadly traffic and pedestrian accidents at the intersection of Laurel Road and Rose Avenue. In order to make safety improvements to Rose Avenue, such as with sidewalks and traffic signals, the city of Oakley has requested Western to remove its

307

CX-004874: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: Categorical Exclusion Determination 74: Categorical Exclusion Determination CX-004874: Categorical Exclusion Determination Laurel Road Pole Relocation, Laurel Road and Rose Avenue (18/3)-Addendum to 061202-Laurel Road Pole Project Relocation Brown Road to Woodhill Drive (18/13-19/3) CX(s) Applied: B4.13 Date: 03/08/2010 Location(s): Oakley, California Office(s): Western Area Power Administration-Sierra Nevada Region The City of Oakley in Contra Costa County is continuing to work on expanding Laurel Road for future development plans. Development of the area has been delayed; however, Oakley is deadly traffic and pedestrian accidents at the intersection of Laurel Road and Rose Avenue. In order to make safety improvements to Rose Avenue, i.e., sidewalks, traffic signals, the City of Oakley has requested Western to remove its existing tower, 18/3

308

National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEPA) Categorical Exclusion (CX) Determination for NEPA) Categorical Exclusion (CX) Determination for the Addition of a Temporary Locker Facility to the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Tennessee (CX-TWPC-IO-0002) The U.S. Department of Energy (DOE) Oak Ridge Office (ORO) proposes to install a temporary modular locker facility which would be utilized as a change house for scrubs/dress out only (no restroom or shower facilities would be provided). The TWPC function is to prepare wastes stored at the Oak Ridge National Laboratory (ORNL) for offsite disposal primarily at the Waste Isolation Pilot Plant (WIPP) and/or the Nevada Test Site (NTS). The proposed action would utilize the current TWPC facility and equipment at a developed site with active utilities and readily accessible roads. The scope of work proposed includes

309

Accessibility validation with RAVEN  

Science Conference Proceedings (OSTI)

Testing is, for most, a necessary evil in the software life cycle. One very important form of testing is the evaluation of software products according to mandated criteria or guidelines such as those that specify level of accessibility. Such evaluations ... Keywords: AOP, GUI, Java, accessibility, reflection, rich-client

Barry Feigenbaum; Michael Squillace

2006-05-01T23:59:59.000Z

310

ENVIRONMENT AL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upper Molina-Lower Molina 115 kV Road Maintenance and Structure Replacement Upper Molina-Lower Molina 115 kV Road Maintenance and Structure Replacement Mesa County, CO A. Brief Description of Proposal: Montrosc maintcnance plans to do acccss road maintenancc and structure replacement on thc Upper Molina-Lower Molina 115 kV transmission line. This includes approximately 10.4 miles of access road and five structure replacements along 4.6 miles of transmission line corridor. A portion of thc structurcs will be replaced in 2011 and thc remaining structures in 2012. All of the structure replacements are on private lands. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CrR Part 1021, Subpart D.) B 1.3 "Routine maintenance/custodial services for buildings, structures, inJ1'astructures,

311

Accessing HPSS at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Accessing HPSS Accessing HPSS Accessing HPSS Once you have successfully generated an HPSS token you can access NERSC's HPSS in the different ways listed below. HSI and HTAR are usually the best ways to transfer data in and out of HPSS but other methods are also included. Access Method When to use this method Features Limitations HSI When a full-featured unix-like interface is desired high performance (parallel); unix-like user interface; firewall mode client is specific to HPSS version and might not work at other sites; HTAR When you have large collections of smaller (~10MB or less) files high performance (parallel); creates a tar file directly in HPSS along with an index file; more efficient for large collections of file same client limitations as HSI; also does not have firewall mode so using on a remote site with a firewall will require modification of firewall rules

312

CX-003366: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-003366: Categorical Exclusion Determination Advanced Combustion Controls - Enabling Systems and Solutions (ACCESS) for High Efficiency Vehicles...

313

CX-003365: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-003365: Categorical Exclusion Determination Advanced Combustion Controls - Enabling Systems and Solutions (ACCESS) for High Efficiency Vehicles...

314

The Road Ahead for Light Duty Vehicle Fuel Demand  

U.S. Energy Information Administration (EIA)

The Road Ahead for Light Duty Vehicle Fuel Demand Joanne Shore Energy Information Administration July 7, 2005 Refining Capacity Surplus Shrank As Demand Grew ...

315

Road to AC Voltage Standard Leads to Important Junction  

Science Conference Proceedings (OSTI)

Road to AC Voltage Standard Leads to Important Junction. ... Grumman in the mid-1990s.*** A number of innovations since then have led to the first ...

2013-08-13T23:59:59.000Z

316

Tyre parameter identification from road tests on a complete vehicle.  

E-Print Network (OSTI)

??Vehicle manufacturers notice a difference between the tyre behaviour observed in road tests with a complete vehicle and the behaviour of the tyre as provided (more)

Lo Conte, D.

2010-01-01T23:59:59.000Z

317

Microsoft Word - CX-Ostrander-TroutdaleAccessRoadsFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Todd Nicholson Supervisory Civil Engineer - TELF-TPP-3 Proposed Action: Ostrander-Troutdale No. 1,...

318

New, stricter Pajarito Road access rules to go into effect Aug...  

NLE Websites -- All DOE Office Websites (Extended Search)

most sensitive areas and now is restricted to those with a valid reason and badge to enter this area. No more "vouching" for family members LOS ALAMOS, N.M., July 16, 2013-Los...

319

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poncha-Canon City West-Midway 230-kV Transmission Line Road Maintenance Poncha-Canon City West-Midway 230-kV Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, CO A. Bl'iefDescription of Proposal: Western Area Power Administration (Western) proposes to maintain sections of its access roads along the Curecanti (CCI)- Poncha (PON)- Canon City West (CCW)- Midway (MID) 230-k V transmission line segments. The work will occur intermittently along the transmission line access in Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties between the Curecanti Substation, Township 48 North, Range 6 West, Section 9 of the New Mexico Principle Meridian and the Midway Substation, Township I 7 South, Range 65 West, Section 20 of the Sixth Principal Meridian. Surveys have shown that maintenance is needed intermittently on approximately

320

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Role Based Access Control for the World Wide Web  

Science Conference Proceedings (OSTI)

... The other way to use RBAC/Web is to modify the UNIX Web server to call the RBAC/Web API to determine RBAC access. ...

322

U.S. Department of Energy Categorical Exclusion Determination Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of a Connector Road Between the Construction Administration Complex (CAC) and the MOX Administration Complex (M Construction of a Connector Road Between the Construction Administration Complex (CAC) and the MOX Administration Complex (M Savannah River Site Aiken/Aiken/South Carolina MOX Services proposes the construction of a road connecting the Construction Administration Complex (CAC) and the MOX Administration Complex (MAC) parking lots. The approximate dimensions of the proposed connector road are 160 feet in length and 17 feet in width, with a construction limits footprint of 0.4 acre. B1.13 - Pathways, short access roads, and rail lines Andrew R. Grainger Digitally signed by Andrew R. Grainger DN: cn=Andrew R. Grainger, o=DOE-SR, ou=EQMD, email=drew.grainger@srs.gov, c=US Date: 2011.11.30 18:35:44 -05'00' 11/21/2011 Submit by E-mail

323

GRR/Section 19 - Water Access & Water Rights Overview | Open Energy  

Open Energy Info (EERE)

- Water Access & Water Rights Overview - Water Access & Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19 - Water Access & Water Rights Overview 19WaterAccessWaterRightsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 19WaterAccessWaterRightsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer may require water for such uses as dust suppression for roads, construction activities, drilling operations, extraction of geothermal resources, plant cooling operations, etc. Water access and water rights are predominantly handled by state law.

324

La Paz and Yuma County Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

maintenance on maintenance on structures 59/3 & 91/3 of the existing Parker-Gila 161-kV transmission line in La Paz and Yuma County Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct maintenance on structures 59/3 & 91/3 of the existing Parker-Gila 161-kV transmission line. This work will consist of replacing bad crossarms. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project areas are situated within Sections 34 Township 2 North Range 19 West & Section 11 Township 5 South Range 20 West on the Gila and Salt River Meridian, La Paz & Yuma County, Arizona. Work will be conducted

325

CX-003124: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24: Categorical Exclusion Determination 24: Categorical Exclusion Determination CX-003124: Categorical Exclusion Determination A1 to CDF Paving Project CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Batavia, Illinois Office(s): Fermi Site Office, Science Existing Road D pavement from Road A1 east to CDF has degraded to the extent that spot repairs and pavement patching are no longer cost effective options. This proposed project would result in repaving Road D from Pine Street east to CDF and realignment of the Road D/Road A1/A2 and Pine Street intersection. The project would also include the installation of a new storm sewer and grading of new drainage swales. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003124.pdf More Documents & Publications CX-003196: Categorical Exclusion Determination CX-010393: Categorical Exclusion Determination

326

The Broadband Access Facility  

Science Conference Proceedings (OSTI)

The deployment of broadband access networks will revolutionise many aspects of society in the early years of the next millennium. Manufacturers, telecommunications providers and cable television operators world-wide are investing heavily on research ...

J. Kelly; R. Adnams; M. Enrico; M. Whittle

2000-01-01T23:59:59.000Z

327

Categorical Exclusion Determinations: Colorado | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 CX-005069: Categorical Exclusion Determination Shuttle Service to South Golden Road RTD Bus Stop CX(s) Applied: A7 Date: 01202011 Location(s): Golden, Colorado Office(s):...

328

Institutional perspectives on road pricing : essays on implementation, response, and adaptation  

E-Print Network (OSTI)

Road pricing involves charging road users a fee for the external social costs of using private vehicles. These costs typically remain unaccounted for in routine road transport operations and benefit-cost analyses. They ...

Mahendra, Anjali, 1977-

2008-01-01T23:59:59.000Z

329

METRo: A New Model for Road-Condition Forecasting in Canada  

Science Conference Proceedings (OSTI)

A numerical model to forecast road conditions, Model of the Environment and Temperature of Roads (METRo), has been developed to run at Canadian weather centers. METRo uses roadside observations from road weather information systems stations as ...

Louis-Philippe Crevier; Yves Delage

2001-11-01T23:59:59.000Z

330

Exact Routing in Large Road Networks Using Contraction Hierarchies  

Science Conference Proceedings (OSTI)

Contraction hierarchies are a simple approach for fast routing in road networks. Our algorithm calculates exact shortest paths and handles road networks of whole continents. During a preprocessing step, we exploit the inherent hierarchical structure ... Keywords: algorithm engineering, route planning, shortest paths

Robert Geisberger; Peter Sanders; Dominik Schultes; Christian Vetter

2012-08-01T23:59:59.000Z

331

Effective map-matching on the most simplified road network  

Science Conference Proceedings (OSTI)

The effectiveness of map-matching algorithms highly depends on the accuracy and correctness of underlying road networks. In practice, the storage capacity of certain hardware, e.g. mobile devices and embedded systems, is sometimes insufficient to maintain ... Keywords: GPS, map-matching, simplified road network

Kuien Liu; Yaguang Li; Fengcheng He; Jiajie Xu; Zhiming Ding

2012-11-01T23:59:59.000Z

332

A Numerical Model for Prediction of Road Temperature and Ice  

Science Conference Proceedings (OSTI)

A numerical model for the prediction of road temperature and ice has been tested on data from a Danish road station. The model is based on the solution of the equation of heat conduction in the ground and the surface energy-balance equation.

Bent H. Sass

1992-12-01T23:59:59.000Z

333

13th Annual Transportation Engineering and Road Research Alliance (TERRA)  

E-Print Network (OSTI)

13th Annual Sponsor: Transportation Engineering and Road Research Alliance (TERRA) Cosponsors: Minnesota Department of Transportation (Mn/DOT) Minnesota Local Technical Assistance Program (LTAP Association State Aid for Local Transportation, Mn/DOT Minnesota Local Road Research Board (LRRB) Pavement

Minnesota, University of

334

Climate policies for road transport revisited (I): Evaluation of the  

Open Energy Info (EERE)

Climate policies for road transport revisited (I): Evaluation of the Climate policies for road transport revisited (I): Evaluation of the current framework Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate policies for road transport revisited (I): Evaluation of the current framework Agency/Company /Organization: Elsevier Complexity/Ease of Use: Not Available Website: www.pik-potsdam.de/members/edenh/publications-1/CPFRTRI.pdf Related Tools Alternative Fuels and Advanced Vehicles Data Center - Codes and Standards Resources Reducing Congestion through Smart Parking Management Performance Measurement in the Road Sector: A Cross-Country Review of Experience ... further results Find Another Tool FIND TRANSPORTATION TOOLS This paper evaluates the effectiveness and efficiency of current climate policies for road transport that (1) target fuel producers and/or car

335

Carbon Capture and Storage Road Map | Open Energy Information  

Open Energy Info (EERE)

and Storage Road Map and Storage Road Map Jump to: navigation, search Name Carbon Capture and Storage Road Map Agency/Company /Organization Asian Development Bank Sector Energy Focus Area Renewable Energy, Economic Development, Greenhouse Gas, Industry Topics Adaptation, Implementation, Low emission development planning, -LEDS Website http://www.adb.org/news/adb-he Country China Eastern Asia References ADB Helps People's Republic of China Plan Carbon Capture and Storage Road Map[1] Program Overview "The Asian Development Bank (ADB) is assisting the People's Republic of China (PRC) in the development of a road map for carbon capture and storage (CCS) to help achieve the country's carbon dioxide (CO2) emissions reduction goals. ADB will assist the PRC in developing a detailed plan for a staged

336

DOE Issues Environmental Assessment on Road Project for Public Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review Brad Bugger (208) 526-0833 DOE Issues Environmental Assessment on Road Project for Public Review The U.S. Department of Energy has issued for public review and comment a draft environmental assessment of the potential environmental impacts of building an internal road to safely ship radioactive material within the Idaho National Laboratory. DOE�s preferred alternative under the environmental assessment is to develop a new, internal road that would connect the Idaho Nuclear Technology and Engineering Center with the Materials and Fuels Complex, a distance of about 20 miles. It would allow the INL to safely ship nuclear materials from the Idaho Nuclear Technology and Engineering Center and the Materials and Fuels Complex without having to utilize public roads, like Highway 20, which adds additional cost and security considerations to each shipment.

337

Riverside County, California. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

California. California. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard SUbstation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. The attached map shows the project area location. The legal description is Section 6 Township 6 South, Range 8 East on the San Bernardino Baseline and Meridian (USGS Ripley, California 7.5' maps). It is estimated that the work would be performed between

338

Riverside County, Califomia. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Califomia. Califomia. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Westem proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard Substation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. The attached map shows the project area location. The legal description is Section 6 Township 6 South, Range 8 East on the San Bemardino Baseline and Meridian (USGS Ripley, Califomia 7.5' maps). It is estimated that the work would be performed between

339

Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ '1 Categorical Exclusion for vegetation removal under existing Saguaro-Tucson 115-kV right-of-way between structures 5/3 thru 6/3 Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kV transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area on private land situated within Section 25

340

Maricopa Counties, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Flagstaff the Flagstaff and Pinnacle Peak communication site building demolition in Coconino and Maricopa Counties, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to remove communication buildings and associated items from the Flagstaff and Pinnacle Peak substations, because they no longer meet our needs and we do not anticipate finding a use for it in the future. This will consist of demolishing buildings and removing communication towers from both locations. The buildings are presently vacant. Western will use crew trucks and pickup trucks along existing access roads to bring personnel and equipment to the work area. The project is located in Coconino and Maricopa Counties, Arizona. The attached maps show the project area locations. The legal descriptions are Section 24

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Categorical Exclusion Determinations: B3.10 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Categorical Exclusion Determinations: B3.10 Existing Regulations B3.10: Particle accelerators Siting, construction, modification, operation, and decommissioning of particle accelerators, including electron beam accelerators, with primary beam energy less than approximately 100 million electron volts (MeV) and average beam power less than approximately 250 kilowatts (kW), and associated beamlines, storage rings, colliders, and detectors, for research and medical purposes (such as proton therapy), and isotope production, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible), or internal modification of any accelerator facility regardless of energy, that does not increase primary beam energy or current. In cases where the

342

Categorical Exclusion Determinations: B3.6 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Categorical Exclusion Determinations: B3.6 Existing Regulations B3.6: Small-scale research and development, laboratory operations, and pilot projects Siting, construction, modification, operation, and decommissioning of facilities for small-scale research and development projects; conventional laboratory operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a concept before demonstration actions, provided that construction or modification would be within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible). Not included in this category are demonstration actions, meaning actions that are undertaken at a scale

343

Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

\ \ * Categorical Exclusion for the installation of a new 230-kV coupling capacitor voltage transformer within the fenced area of the Pinnacle Peak Substation located in Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes on installing a new 230-kV coupling capacitor voltage transformer within the fenced area of the Pinnacle Peak Substation. This will also consist of, modifying the existing foundation structure & installing conduit & control cable in a trench to the control building. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system.

344

Maricopa County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

replacing of 230-kV replacing of 230-kV conductor and circuit breaker within the fenced area of the Pinnacle Peak Substation located in Maricopa County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes on replacing 230-kV conductor in four bays and one 230-kV power circuit breaker voltage transformer within the fenced area of the Pinnacle Peak Substation, This will also consist of rerouting existing conduit in a 20 foot trench going 24 inches in depth, We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work area, This work is necessary to maintain the safety and reliability of the bulk electrical system, The attached map shows the project area location. The legal description is Section 10

345

Clark County, Nevada RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Basic (BAS) Basic (BAS) Phase" Soil Remediation located in Clark County, Nevada RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to excavate PCB and TPH contaminated soils within the Basic Substation yards 1, 2 and 3 as well as the T9 and T10 areas as well as remove asbestos wrapped pipe and conduit. Western will also be removing creosote-contaminated railroad ties. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes and dump trucks. This work is necessary to maintain sanitary and safe working conditions. The attached map shows the project area location northwest of Henderson, Nevada. The legal description is Section 13 Township 22 South Range 62 East & Section 18 Township 22 South Range 63 East on the Mt. Diablo Baseline and Meridian (USGS Las

346

Windshield Wilderness: Cars, Roads, and Nature in Washingtons National Parks  

E-Print Network (OSTI)

Review: Windshield Wilderness: Cars, Roads, and Nature inLouter. Windshield Wilderness: Cars, Roads, and Nature inpost-consumer waste. Cars, not people, are the parks

Anderson, Byron

2006-01-01T23:59:59.000Z

347

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

348

South Carolina | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Installation of Traffic Signals on C-Road for the Biomass Cogeneration Facility Access Road CX(s) Applied: B1.32 Date: 09222011...

349

Review: A review of surface erosion and sediment delivery models for unsealed roads  

Science Conference Proceedings (OSTI)

This paper reviews available models for estimating surface erosion and sediment delivery to streams from unsealed roads. It summarises current progress and identifies directions for ongoing research and model development. The paper provides a framework ... Keywords: Modelling, Road drainage, Road erosion, Sediment, Sediment delivery, Unsealed road

Baihua Fu; Lachlan T. H. Newham; C. E. Ramos-Scharrn

2010-01-01T23:59:59.000Z

350

Dillard Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Dillard Road Solar Power Facility Dillard Road Solar Power Facility Jump to: navigation, search Name Dillard Road Solar Power Facility Facility Dillard Road Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.465275°, -121.17847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.465275,"lon":-121.17847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

End of the road for Roadrunner | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

352

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

353

End of the road for Roadrunner | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

End of the road for Roadrunner | National Nuclear Security Administration End of the road for Roadrunner | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > End of the road for Roadrunner End of the road for Roadrunner Posted By Office of Public Affairs This weekend, Roadrunner, the World's Fastest Supercomputer from 2008, will be switched off but not be forgotten.

354

Marsh Road Power Plant Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Marsh Road Power Plant Biomass Facility Marsh Road Power Plant Biomass Facility Jump to: navigation, search Name Marsh Road Power Plant Biomass Facility Facility Marsh Road Power Plant Sector Biomass Facility Type Landfill Gas Location San Mateo County, California Coordinates 37.4337342°, -122.4014193° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.4337342,"lon":-122.4014193,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

One Woman's Road to Recovery | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

One Woman's Road to Recovery One Woman's Road to Recovery One Woman's Road to Recovery October 19, 2010 - 6:04pm Addthis One Woman's Road to Recovery Jo Napolitano Media Specialist, Argonne National Laboratory Editor's Note: Cross-posted from Argonne National Lab's Portraits of ARRA. Rebecca Bivens, who worked for a major oil company for seven years before she was laid off in January 2008, was elated to land a job that summer at one of the world's largest equipment manufacturers. That is, until the company laid off her entire division the night before Christmas Eve. "No one saw it coming," said Bivens, who spent years working in safety and procurement. "Just the month before, they said we were doing great. After losing two jobs in a year, it was pretty depressing. It was scary."

356

Candidate sets for alternative routes in road networks  

Science Conference Proceedings (OSTI)

We present a fast algorithm with preprocessing for computing multiple good alternative routes in road networks. Our approach is based on single via node routing on top of Contraction Hierarchies and achieves superior quality and efficiency compared to ...

Dennis Luxen; Dennis Schieferdecker

2012-06-01T23:59:59.000Z

357

The Road Ahead for Light Duty Vehicle Fuel Demand  

Gasoline and Diesel Fuel Update (EIA)

Energy Information Administration Logo. If you need assistance viewing this page, please call (202) 586-8800 The Road Ahead for Light Duty Vehicle Fuel Demand Click here to start...

358

New priorities for old roads : re-thinking roadway preservation  

E-Print Network (OSTI)

Most of the roads built over the last century in the US were built assuming that efficient mobility for drivers was most important without considering impacts to the natural or built environment. Urban neighborhoods were ...

Sylvester, Kathleen R. (Kathleen Rynn)

2009-01-01T23:59:59.000Z

359

Valuation of the Indiana Toll Road and Chicago Skyway privatizations  

E-Print Network (OSTI)

This thesis analyzes the economics and financing of the recent purchases of the Indiana Toll Road and Chicago Skyway. Similar privatizations have been occurring around the world, but the economic motive for such transactions ...

Chaudary, Faiza A. (Faiza Arshad)

2010-01-01T23:59:59.000Z

360

On Road Fuel Economy Performance of Hybrid Electric Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Road Fuel Economy Performance of Hybrid Electric Vehicles Lee Slezak Office of FreedomCAR and Vehicle Technologies U.S. Department of Energy Jim Francfort Advanced Vehicle Testing...

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

U.S. Virgin Islands Energy Road Map: Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Technical Report NRELTP-7A20-52360 September 2011 NREL is a national laboratory of the U.S. Department of Energy,...

362

State of roads : public works as research, India circa 1960  

E-Print Network (OSTI)

That the road is a symbol of the prowess of the nation-state seems tautological, a uni"ed phenomenon of political symbolism that manifests as an infrastructural network. When subjected to a close historical examination, ...

Khorakiwala, Ateya A

2009-01-01T23:59:59.000Z

363

Road Transportable Analytical Laboratory system. Phase 1  

SciTech Connect

This developmental effort clearly shows that a Road Transportable Analytical Laboratory System is a worthwhile and achievable goal. The RTAL is designed to fully analyze (radioanalytes, and organic and inorganic chemical analytes) 20 samples per day at the highest levels of quality assurance and quality control. It dramatically reduces the turnaround time for environmental sample analysis from 45 days (at a central commercial laboratory) to 1 day. At the same time each RTAL system will save the DOE over $12 million per year in sample analysis costs compared to the costs at a central commercial laboratory. If RTAL systems were used at the eight largest DOE facilities (at Hanford, Savannah River, Fernald, Oak Ridge, Idaho, Rocky Flats, Los Alamos, and the Nevada Test Site), the annual savings would be $96,589,000. The DOE`s internal study of sample analysis needs projects 130,000 environmental samples requiring analysis in FY 1994, clearly supporting the need for the RTAL system. The cost and time savings achievable with the RTAL system will accelerate and improve the efficiency of cleanup and remediation operations throughout the DOE complex.

Finger, S.M.; Keith, V.F.; Spertzel, R.O.; De Avila, J.C.; O`Donnell, M.; Vann, R.L.

1993-09-01T23:59:59.000Z

364

Access Grid | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Access Grid Access Grid Access Grid The Access Grid is the ensemble of resources that can be used to support human interaction across the grid. It consists of multimedia display, presentation and interactive environments, interfaces to grid middleware, and interfaces to visualization environments. The Access Grid will support large-scale distributed meetings, collaborative work sessions, seminars, lectures, tutorials and training. The Access Grid design point is group-to-group communication (thus differentiating it from desktop to desktop based tools that focus on individual communication). The Access Grid environment must enable both formal and informal group interactions. Large-format displays integrated with intelligent or active meeting rooms are a central feature of the Access Grid nodes. Access Grid nodes are

365

Non-Road Electric Vehicle Emissions: Analysis and Recommendations  

Science Conference Proceedings (OSTI)

Energy security and quality of life in the United States and around the globe are dependent upon the reduction of air pollution, petroleum dependency, and developing a solution to global warming. Non-road transportation equipment offers an opportunity to support this quality of life objective with a reduction in emissions through electrification. Private sector initiatives and regulatory agencies have begun to focus on non-road vehicles and equipment. This emission source category, which was largely unre...

2003-08-18T23:59:59.000Z

366

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (Participating TO) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Companys (PG&E) Docket No. ER01-66-000, (2) San Diego Gas and Electric Companys supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (TRBA) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

367

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

368

ARCS Access Rate Control System  

protected steel housing. ... Access Rate Control System This rugged, maintenance- ... Y-12 is seeking an industry partner to fully com-

369

Topic: Emergency Egress and Access  

Science Conference Proceedings (OSTI)

Topic: Emergency Egress and Access. Fire Research Seminar Series. NIST WTC Recommendations Are Basis for New Set of Revised Codes. ...

2012-08-20T23:59:59.000Z

370

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

371

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

Road Maintenance and StructUI'e Replacement on the Road Maintenance and StructUI'e Replacement on the Artesia-Rangeley 138-kV Transmission Line Tap Uintah County, Utah, and Rio Blanco County, Colorado A. BriefDescl'iption of Proposal: Western Area Power Administration (Western) proposes to complete minor road maintenance and structure pole replacement on the Artesia-Rangely tap of the Hayden-Vernal transmission line. The road maintenance and dry wash culvert replacement will occur intermittently, as needed, along approximately 25 miles of existing access road between coordinates Longitude 108 degrees, 49', 18" West, Latitude 40 degrees, 4', 29" Notth; and Longitude 109 degrees, 7', 45.89" West, Latitude 40 degrees, 14', 57.09" North. Twelve existing structures 1/4, 5/8,5/9,6/3, 8/2, 12/2, 12/8, 14/5, 15/1, 16/2, 18/5, and 20/2 will be replaced along

372

NSLS User Access | Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Training Training for New Users and Users with Expired Training and/or Badges: All new users and users with expired badges must complete or update the training modules shown below prior to access to the experimental floor. The training can be completed online prior to arrival at the NSLS and is strongly recommended to save considerable time during check-in at the Guest, User, Visitor (GUV) Center in Building 400. Please note each training module is followed by an exam which asks for your name and guest number. If you do not already have a guest number, leave this entry blank. All new users and users with expired badges MUST arrive on a weekday (no weekends or holidays) and check in at the GUV Center so that your training can be verified and to receive a photo ID badge (new or updated). The GUV

373

OpenEI:Utility data access map | Open Energy Information  

Open Energy Info (EERE)

Utility data access map Utility data access map Jump to: navigation, search Ret Utility Data Access Map Having access to your electricity use data is a very important step in understanding your overall energy usage. Comparing historical data to your current usage is one way to see trends and determine ways for reducing electricity costs and improving overall efficiency. We asked all U.S. electric utility companies to tell us how accessible their electricity use data is for both residential and commercial customers. The results are updated live based on the responses we have to date. As more utilities provide information, the utility boundaries will be automatically colored and the overall map will become more complete. Try searching for your utility company to see your electricity data access options.

374

REMOTE ACCESS SERVICES | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

REMOTE ACCESS SERVICES REMOTE ACCESS SERVICES REMOTE ACCESS SERVICES Access the information you need... Anywhere. Anytime. Different service providers within the Department offer remote access services based on your specific work requirements. If you need assistance, please contact your individual service provider. Energy IT Services (EITS) Remote Access Services Outlook Web Access RSA Token Login RSA Token Instructions HSPD-12 Login HSPD-12 Badge Instructions Virtual Private Network Instructions Citrix Workplace Instructions Energy Information Administration (EIA) Remote Access Services Outlook Web Access EIA VPN Office of Intelligence and Counterintelligence (IN) Remote Access Services Outlook Web Access Office of Science (SC) Remote Access Services Citrix Workplace Help for EITS Customers

375

Furman University OPEN ACCESS PLUS MEDICAL  

E-Print Network (OSTI)

Furman University OPEN ACCESS PLUS MEDICAL BENEFITS ­ Core Plan OPEN ACCESS PLUS MEDICAL BENEFITS ............................................................................................................................................11 Open Access Plus Medical Benefits

376

INFOGRAPHIC: The Road to Fuel Efficiency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Road to Fuel Efficiency The Road to Fuel Efficiency INFOGRAPHIC: The Road to Fuel Efficiency November 27, 2012 - 11:01am Addthis This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. This infographic takes a look at fuel economy standards and how recent improvements in these standards will benefit consumers and the U.S. economy. | Infographic by Sarah Gerrity. Sarah Gerrity Sarah Gerrity Multimedia Editor, Office of Public Affairs The Obama Administration's new national fuel economy standards for passenger vehicles will improve vehicle efficiency and save Americans money at the pump, all while reducing our dependence on foreign oil and growing

377

Electricity for road transport, flexible power systems and wind power  

Open Energy Info (EERE)

road transport, flexible power systems and wind power road transport, flexible power systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and wind power Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

378

On the Road with ARPA-E | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On the Road with ARPA-E On the Road with ARPA-E On the Road with ARPA-E September 23, 2010 - 12:29pm Addthis ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. ARPA-E Director Dr. Arun Majumdar and MSU Project Lead Dr. Norbert Mueller test the wave disk engine. Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy Auto enthusiasts should be forewarned that this post may make you jealous. I say that because earlier this month I traveled to Michigan to visit two projects ARPA-E is currently funding - one at Michigan State University (MSU), the second at General Motors (GM), and got an up close look at several innovative transportation-related energy advancements. While at MSU, I had the op portunity to tour the facility where the wave

379

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

380

Bruceville Road Solar Power Facility | Open Energy Information  

Open Energy Info (EERE)

Bruceville Road Solar Power Facility Bruceville Road Solar Power Facility Jump to: navigation, search Name Bruceville Road Solar Power Facility Facility Bruceville Solar Power Facility Sector Solar Facility Type Photovoltaics Facility Status In Service Developer Recurrent Energy Energy Purchaser Sacramento Municipal Utility District Location Elk Grove, California Coordinates 38.347479°, -121.412498° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.347479,"lon":-121.412498,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2010 21, 2010 CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office April 2, 2010 CX-006727: Categorical Exclusion Determination Weirbox Installation CX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3 Date: 04/02/2010 Location(s): Casper, Wyoming Office(s): RMOTC March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration March 24, 2010 CX-001206: Categorical Exclusion Determination Tehachapi Wind Energy Storage

382

CX-008442: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-008442: Categorical Exclusion Determination Arizona Power Partners - Smart Grid Data Access from an Advanced Meter Reading Network CX(s)...

383

Executive Order 12968 Access to Classified Information  

NLE Websites -- All DOE Office Websites (Extended Search)

40243 40243 Monday August 7, 1995 Part IV The President Executive Order 12968-Access to Classified Information Presidential Determination No. 95-32 of July 28, 1995 Presidential Determination No. 95-33 of July 31, 1995 Presidential Documents 40245 Federal Register Vol. 60, No. 151 Monday, August 7, 1995 Title 3- The President Executive Order 12968 of August 2, 1995 Access to Classified Information The national interest requires that certain information be maintained in confidence through a system of classification in order to protect our citizens, our democratic institutions, and our participation within the community of nations. The unauthorized disclosure of information classified in the national interest can cause irreparable damage to the national security and loss of human life.

384

Different Roads Toward Quantum Criticality | Advanced Photon...  

NLE Websites -- All DOE Office Websites (Extended Search)

after its publication: "Before doing experiments I usually went in to see Conyers Herring to bounce ideas off of him. I asked whether it would be interesting to determine the...

385

Laboratory Access | Sample Preparation Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

Access Access Planning Ahead Planning Ahead Please complete the Beam Time Request (BTR) and Support Request forms thourgh the User Portal. Thorough chemical and sample information must be included in your BTR. Support Request forms include a list of collaborators that require laboratory access and your group's laboratory equipment requests. Researcher safety is taken seriously at SLAC. Please remember that radioactive materials, nanomaterials, and biohazardous materials have additional safety requirements. Refer to the SSRL or LCLS Safety Offices for further guidance. Upon Arrival Upon Arrival Once you arrive you must complete training and access forms before accessing the Sample Preparation Laboratories (SPL). All Sample Prep Lab doors are locked with access key codes. Once your SPL

386

Furman University OPEN ACCESS PLUS MEDICAL  

E-Print Network (OSTI)

8:54 AM Furman University OPEN ACCESS PLUS MEDICAL BENEFITS ­ Basic Plan OPEN ACCESS PLUS MEDICAL ...................................................................................................................................................10 Open Access Plus Medical Benefits Basic Plan ...............................................................................................................................................................12 Open Access Plus Medical Benefits Core Plan

387

u.s. DEPARThIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of3 of3 RECIPIENT: NREL STATE: CO PROJE{.T T1TLK: Solar TAC - Thermal Energy Storage Test Facility; NREL Tracking No. 11 -016 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number NREL-11-016 cm Number G028308 Based on my r eview of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 81 .15 Siting, construction (or modification), and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible). Covered support buildings and structures include those for office

388

Access Control Policy Tool (ACPT)  

Science Conference Proceedings (OSTI)

... In regard to cyber security, privacy, and information sharing, access control is one of the crucial elements in protecting the nation's critical IT ...

2013-01-15T23:59:59.000Z

389

Foreign National Access Request Form  

NLE Websites -- All DOE Office Websites (Extended Search)

will be allowed access to the ANL facility prior to approval by the Security and Counterintelligence Division. The visitor must have a valid passport and visa (or supplemental...

390

Science Open Access Journals - About  

Office of Scientific and Technical Information (OSTI)

SOAJ allows the user to search multiple open access publications with a single query. The query is sent simultaneously to each individual database searched by SOAJ,...

391

Optical access port  

DOE Patents (OSTI)

A 0.025 m diameter optical access port system is provided for a high-pressure (20.4 bars) and high-temperature (538{degrees}C) fixed-bed coal gasification process stream. A pair of proximal channels lead into the pipe containing the process stream with the proximal channels disposed on opposite sides of the pipe and coaxial. A pair of ball valves are attached to respective ends of proximal channels for fluidly closing the respective channels in a closed position and for providing a fluid and optical aperture in an open position. A pair of distal channels are connected to respective ball valves. These distal channels are also coaxial with each other and with the proximal channels. Each distal channel includes an optical window disposed therein and associated sealing gaskets. A purge gas is introduced into each distal channel adjacent a respective optical window. The purge gas is heated by a heater before entry into the distal channels. Preferably the optical windows are made of fused silica and the seals are Grafoil gaskets which are pressed against the optical window. 3 figs.

Lutz, S.A.; Anderson, R.J.

1988-09-14T23:59:59.000Z

392

Internal Controls Over Sensitive Compartmented Information Access...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements, IG-0796 Internal Controls Over Sensitive Compartmented Information Access...

393

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oregon E.V. Road Map - Electric Drive Vehicle (PHEVs) Testing Activities and Results Jim Francfort E.V. Road Map - Preparing Oregon for the Introduction of Electric Vehicles...

394

Conceptual and Scaling Evaluation of Vehicle Traffic Thermal Effects on Snow/Ice-Covered Roads  

Science Conference Proceedings (OSTI)

The potential thermal effects of traffic on road surface thermal energy balance under frost/snow cover conditions have been largely ignored in meteorological evaluations of road ice deposit conditions. Preliminary exploration of these effects, ...

Joseph M. Prusa; Moti Segal; Bradley R. Temeyer; William A. Gallus Jr.; Eugene S. Takle

2002-12-01T23:59:59.000Z

395

The Private Provision of Frontier Infrastructure: Toll Roads in California, 1850-1902  

E-Print Network (OSTI)

action. The impetus for taking stock was not dividends butimpetus for taking toll road stock. Voluntary association

Klein, Daniel B.; Yin, Chi

1994-01-01T23:59:59.000Z

396

Putting Electricity Where The Rubber Meets the Road [NEWS  

Science Conference Proceedings (OSTI)

In-wheel motors can improve fuel economy and safety for hybrid electric vehicles. A motor housed inside a wheel hub can shunt up to 96 percent of the torque it generates directly to the patch of tire that touches the road. With a conventional drivetrain, ...

W. D. Jones

2007-07-01T23:59:59.000Z

397

Remote Sensing Messungen zur on-road Bestimmung der  

E-Print Network (OSTI)

LUBETRAX Remote Sensing Messungen zur on-road Bestimmung der Abgase von schweren Motorfahrzeugen, Chur, Zürich, Brugg Dr. Peter Maly (Projektleitung) Dr. Stefan Scherer Dr. G.A. Bishop (Remote Sensing;Inhaltsverzeichnis Zusammenfassung 1 1. Einleitung und Zielsetzung 3 1.1 Remote Sensing Messungen (FEAT) 4 1

Denver, University of

398

Harmful Exhaust Emissions Monitoring of Road Vehicle Engine  

Science Conference Proceedings (OSTI)

Road vehicle improve the quality of people's life, however harmful vehicle exhaust emissions, such as carbon monoxide (CO), nitric oxide (NO), nitrogen dioxide (NO2), hydrocarbon (HC), and sulphur dioxide (SO2), have become more and more unacceptable ... Keywords: optic absorption spectroscopy based gas sensor, harmful exhaust emission monitoring, engine vibration

Chuliang Wei; Zhemin Zhuang; H. Ewald; A. I. Al-Shamma'a

2012-01-01T23:59:59.000Z

399

A GIS based approach to predicting road surface temperatures  

Science Conference Proceedings (OSTI)

Treatment of transport networks of the winter period is a key responsibility of maintenance teams whether in the private or public sector. With tightening budgets and increasing statutory requirements, maintenance teams are looking to improve the treatment ... Keywords: ASP.NET, ArcGIS server, GIS, ice prediction, roads

Richard Fry; Lionel Slade; George Taylor; Ian Davy

2007-11-01T23:59:59.000Z

400

Fuel-Based On-Road Motor Vehicle Emissions Inventory  

E-Print Network (OSTI)

Fuel-Based On-Road Motor Vehicle Emissions Inventory for the Denver Metropolitan Area Sajal S sales from tax department -quite precise Inventory -uncertainty can be estimated Travel Based Model FuelGasohol (LTK, PAS) Tons/day3748369Gasoline (LTK, PAS) g per kg of fuel7859Gasohol (LTK, PAS) g per kg

Denver, University of

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ROAD AND STREAM NETWORK CONNECTIVITY NORTHEASTERN PUERTO RICO  

E-Print Network (OSTI)

variables which are influenced by R/S connectivity. Physical R/S connectivity at 24 river road crossing (RRC alteration in the immediate area of the RRC. To gain incite into underlying dynamics scour scores were type, and Stream size, resulting in a model with a R2 value of 0.64. A method of evaluating RRC acting

402

Road Transportable Analytical Laboratory (RTAL) system: Volume I. Final report  

Science Conference Proceedings (OSTI)

This report describes a portable laboratory system for the analysis of soils, ground water, and surface waters for the detection and quantification of hazardous materials, organics, and radioactive contaminants. The goal of the Road Transportable Analytical Laboratory (RTAL) is a sample throughput of 20 samples per day, providing a full range of analysis on each sample within 16 hours of preparation with high accuracy.

Finger, S.M.; De Avila, J.C.; Keith, V.F.

1996-08-01T23:59:59.000Z

403

The safe system approach: a road safety strategy based on human factors principles  

Science Conference Proceedings (OSTI)

In most safety critical domains, safety has been improved through the application of contemporary human error models and management methods. But the common strategic approach to improve road safety has so far mainly been built on the view that individual ... Keywords: human factors, road safety, road users, safe System approach, safety, system safety, vision zero

Peter Larsson, Claes Tingvall

2013-07-01T23:59:59.000Z

404

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

obtain an easement for an existing access road obtain an easement for an existing access road which is located in Carroll County, Arkansas. The easement will serve to facilitate Southwestern's electrical utility vehicles accessing electrical transmission line 3008, near structure 33, in Carroll County, Arkansas. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: January 28, 2011 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021, Appendix B to Subpart D, Part B1.24- Transfer, lease, disposition or acquisition of interests in uncontaminated permanent or temporary structures, equipment therein, and only land that is necessary for use of the transferred structures and equipment, for residential, commercial, or industrial uses. REGULATORY REQUIREMENTS IN 10 CFR 1021.410(B):

405

Paleoseismic investigations of Stagecoach Road fault, southeastern Yucca Mountain, Nye County, Nevada  

Science Conference Proceedings (OSTI)

This report summarizes the results of paleoseismic investigations at two trenches (SCR-T1 and SCR-T3) excavated across the Stagecoach Road (SCR) fault at the southeastern margin of Yucca Mountain. The results of these studies are based on detailed mapping or logging of geologic and structural relationships exposed in trench walls, combined with descriptions of lithologic units, associated soils, and fault-related deformation. The ages of trench deposits are determined directly from geochronologic dating of selected units and soils, supplemented by stratigraphic and soil correlations with other surficial deposits in the Yucca Mountain area. The time boundaries used in this report for subdivision of the Quaternary period are listed in a table. These data and interpretations are used to identify the number, amounts, timing, and approximately lengths of late to middle Quaternary (less than 200 ka) surface-faulting events associated with paleoearthquakes at the trench sites. This displacement history forms the basis for calculating paleoearthquake recurrence intervals and fault-slip rates for the Stagecoach Road fault and allows comparison with fault behavior on other Quaternary faults at or near Yucca Mountain.

Menges, C.M.; Oswald, J.A.; Coe, J.A.; Lundstrom, S.C.; Paces, J.B.; Mahan, S.A.; Widmann, B.; Murray, M.

1998-04-01T23:59:59.000Z

406

Notices Accessible Format: Individuals with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

472 Federal Register 472 Federal Register / Vol. 77, No. 83 / Monday, April 30, 2012 / Notices Accessible Format: Individuals with disabilities can obtain this document in an accessible format (e.g., braille, large print, audiotape, or computer diskette) on request to the program contact person listed under FOR FURTHER INFORMATION CONTACT. Electronic Access to This Document: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document

407

Network Access to Multimedia Information  

Science Conference Proceedings (OSTI)

This report summarises the requirements of research and academic network users for network access to multimedia information. It does this by investigating some of the projects planned or currently underway in the community. Existing information systems ...

C. Adie

1994-05-01T23:59:59.000Z

408

XML access control using static analysis  

Science Conference Proceedings (OSTI)

Access control policies for XML typically use regular path expressions such as XPath for specifying the objects for access-control policies. However such access-control policies are burdens to the query engines for XML documents. To relieve this burden, ... Keywords: Access control, XML, XPath, XQuery, automaton, query optimization, schema, static analysis, value-based access control, view schema

Makoto Murata; Akihiko Tozawa; Michiharu Kudo; Satoshi Hada

2006-08-01T23:59:59.000Z

409

Godfrey Road, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Godfrey Road, Florida: Energy Resources Godfrey Road, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.293686°, -80.223003° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.293686,"lon":-80.223003,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

410

U.S. Virgin Islands Energy Road Map: Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Technical Report NREL/TP-7A20-52360 September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 U.S. Virgin Islands Energy Road Map: Analysis Eric Lantz, Dan Olis, and Adam Warren Prepared under Task No. IDVI.0020 Technical Report NREL/TP-7A20-52360 September 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

411

Airport Road, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Road, Wyoming: Energy Resources Road, Wyoming: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.9932901°, -107.9492606° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.9932901,"lon":-107.9492606,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

412

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

413

Moose Wilson Road, Wyoming: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Road, Wyoming: Energy Resources Road, Wyoming: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.5252053°, -110.844655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.5252053,"lon":-110.844655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

414

Science Education on the Road: 2013 Princeton University Community and  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Education on the Road: 2013 Princeton University Community and Science Education on the Road: 2013 Princeton University Community and Staff Day October 12, 2013 Gallery: It was a beautiful autumn day in Princeton, NJ. As tailgaters got ready for the football game (Princeton vs. Lafayette) in Lot 21, others took the short walk into Jadwin Gym to take part in the University's Annual Community & Staff Day. PPPL was represented by the Science Education Department and in usual Science Ed. fashion, we did not disappoint! The table was busy all day with kids and adults equally fascinated by what they learned... Plasma! From the hair-raising Van de Graaff generator to the innovative Plasma Speaker to the surprising vacuum pump marshmallow experiment, folks were wowed by what they saw. Spreading the word about Plasma while having a great time, check!

415

Microsoft Word - WIPPSouthAccess.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP em cess Road, WIPP's No utheastern on fixed-pric the WIPP m mpletion is South Acces ng Carlsbad n project wa RA). Under ss the coun used to suc ter and the A funds, WI 1...

416

Trends in On-Road Vehicle Emissions of Ammonia  

NLE Websites -- All DOE Office Websites (Extended Search)

Trends in On-Road Vehicle Emissions of Ammonia Trends in On-Road Vehicle Emissions of Ammonia Title Trends in On-Road Vehicle Emissions of Ammonia Publication Type Journal Article Year of Publication 2008 Authors Kean, Andrew J., David Littlejohn, George Ban-Weiss, Robert A. Harley, Thomas W. Kirchstetter, and Melissa M. Lunden Journal Atmospheric Environment Abstract Motor vehicle emissions of ammonia have been measured at a California highway tunnel in the San Francisco Bay area. Between 1999 and 2006, light-duty vehicle ammonia emissions decreased by 38 ± 6%, from 640 ± 40 to 400 ± 20 mg kg-1. High time resolution measurements of ammonia made in summer 2001 at the same location indicate a minimum in ammonia emissions correlated with slower-speed driving conditions. Variations in ammonia emission rates track changes in carbon monoxide more closely than changes in nitrogen oxides, especially during later evening hours when traffic speeds are highest. Analysis of remote sensing data of Burgard et al. (Environ Sci. Technol. 2006, 40, 7018-7022) indicates relationships between ammonia and vehicle model year, nitrogen oxides, and carbon monoxide. Ammonia emission rates from diesel trucks were difficult to measure in the tunnel setting due to the large contribution to ammonia concentrations in a mixed-traffic bore that were assigned to light-duty vehicle emissions. Nevertheless, it is clear that heavy-duty diesel trucks are a minor source of ammonia emissions compared to light-duty gasoline vehicles.

417

HM-ACCESS Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HM-ACCESS Project HM-ACCESS Project Framework for the Use of Electronic Shipping Papers for the Transport of Hazardous Materials HM-ACCESS Project (Framework for the Use of...

418

2e Carbon Access | Open Energy Information  

Open Energy Info (EERE)

Access Jump to: navigation, search Name 2e Carbon Access Place New York, New York Zip 10280 Sector Carbon Product 2E Carbon Access is an enterprise focused solely on bringing...

419

Insights on the Road to Performance Excellence January ...  

Science Conference Proceedings (OSTI)

... In her article, Leslie Gaines-Ross makes the point that anyone with a personal computer and access to blogs, Facebook, Twitter, or YouTube can ...

2012-12-31T23:59:59.000Z

420

Cultural Resource Investigations for a Multipurpose Haul Road on the Idaho National Laboratory  

Science Conference Proceedings (OSTI)

The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed to identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.

Brenda R. Pace; Cameron Brizzee; Hollie Gilbert; Clayton Marler; Julie Braun Williams

2010-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access NBP RFI: Data Access Neustar, Inc. ("Neustar") hereby submits comments in response to the captioned Request for Information ("RFI") of the Department of Energy ("DOE"). The...

422

Remote Access of Computer Controlled Experiments.  

E-Print Network (OSTI)

??In this paper, we present a way for students to access and operate laboratory equipment, controlled by a laboratory computer via a remote access program. (more)

Nilsson, Kristian; Zackrisson, Johan

2008-01-01T23:59:59.000Z

423

International Electricity Trade - Open Access | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

International Electricity Trade - Open Access International Electricity Trade - Open Access DOE has consistently expressed its policy that international electricity trade should be...

424

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to AuIt 230-kV Transmission Line Structnre Replacement, Weld Connty, Colorado to AuIt 230-kV Transmission Line Structnre Replacement, Weld Connty, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230-kV transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of- way easement. Existing access would be used and no new roads are proposed. Equipment used in the work includes pick-ups, truck mounted augers and cranes, bucket trucks, and skid steer loaders.

425

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

to Ault 230-kV Transmission Line Structure Replacement, Weld County, Colorado to Ault 230-kV Transmission Line Structure Replacement, Weld County, Colorado A. Bl'ief Description of Proposal: Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230-kV transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town ofNunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of- way easement. Existing access would be used and no new roads are proposed. Equipment used in the work includes pick-ups, truck mounted augers and cranes, bucket trucks, and skid steer loaders.

426

Opportunities for the Use of Renewable Energy in Road Transport | Open  

Open Energy Info (EERE)

Opportunities for the Use of Renewable Energy in Road Transport Opportunities for the Use of Renewable Energy in Road Transport Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Opportunities for the Use of Renewable Energy in Road Transport Agency/Company /Organization: Renewable Energy Technology Deployment Sector: Energy Focus Area: Renewable Energy, Transportation Topics: Implementation, Policies/deployment programs Resource Type: Publications, Guide/manual Website: www.iea-retd.org/files/RETRANS_PolicyMakersReport_final.pdf Opportunities for the Use of Renewable Energy in Road Transport Screenshot References: Opportunities for the Use of Renewable Energy in Road Transport[1] "This report discusses the current state of the art of the use of options for using renewable energies in road transport, and explores possible

427

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

428

Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel  

NLE Websites -- All DOE Office Websites (Extended Search)

2: January 21, 2: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation to someone by E-mail Share Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Facebook Tweet about Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Twitter Bookmark Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Google Bookmark Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Delicious Rank Vehicle Technologies Office: Fact #502: January 21, 2008 Off-Road Diesel Equipment Facing Tougher Emissions Regulation on Digg

429

Reducing rural poverty through increased access to energy services: a  

Open Energy Info (EERE)

Reducing rural poverty through increased access to energy services: a Reducing rural poverty through increased access to energy services: a review of the multifunctional platform project in Mali Jump to: navigation, search Tool Summary Name: Reducing rural poverty through increased access to energy services: a review of the multifunctional platform project in Mali Agency/Company /Organization: Abeeku Brew-Hammond & Anna Crole-Rees Partner: United Nations Development Programme (UNDP) Sector: Energy Focus Area: Renewable Energy, Non-renewable Energy, Energy Efficiency, People and Policy Phase: Create a Vision, Determine Baseline, Develop Goals, Evaluate Effectiveness and Revise as Needed Topics: Co-benefits assessment, - Energy Access Resource Type: Publications User Interface: Website Website: www.beta.undp.org/undp/en/home/librarypage/environment-energy/sustaina

430

CX-007663: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

63: Categorical Exclusion Determination 63: Categorical Exclusion Determination CX-007663: Categorical Exclusion Determination Construction of a Connector Road Between the Construction Administration Complex (CAC) and the Mixed Oxide Administration Complex (MAC) Parking Lots CX(s) Applied: B1.13 Date: 11/21/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office Mixed Oxide (MOX) Services proposes the construction of a road connecting the Construction Administration Complex (CAC) and the MOX Administration Complex (MAC) parking lots. The approximate dimensions of the proposed connector road are 160 feet in length and 17 feet in width, with a construction limits footprint of 0.4 acre. CX-007663.pdf More Documents & Publications CX-010852: Categorical Exclusion Determination

431

CX-009786: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Categorical Exclusion Determination 86: Categorical Exclusion Determination CX-009786: Categorical Exclusion Determination Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25 megavolt Ampere Beck Road Substation, to serve load growth in the region east of Spokane, Washington. CX-009786.pdf More Documents & Publications CX-008691: Categorical Exclusion Determination

432

CX-007873: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73: Categorical Exclusion Determination 73: Categorical Exclusion Determination CX-007873: Categorical Exclusion Determination Northeast Photovoltaic Regional Training Provider CX(s) Applied: A9, A11, B3.14 Date: 01/27/2012 Location(s): New York Offices(s): Golden Field Office Hudson Valley Community College's sub recipient Suffolk Community College proposes to use federal funding to purchase three mock roof systems to support a solar photovoltaic (PV) educational program. This project is will be located at 533 College Road, Selden, New York: 11784 .The proposed site, located one mile southwest of Selden, New York:, is bordered by County Road 97 on the west and College Road on the east. The campus is surrounded by residential communities. CX-007873.pdf More Documents & Publications CX-007872: Categorical Exclusion Determination

433

CX-002034: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-002034: Categorical Exclusion Determination Road Prison Geothermal Earth Coupled Heating, Ventilation, and Air Conditioning Upgrade CX(s) Applied: B3.1, A9 Date: 04/20/2010 Location(s): Escambia County, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The proposed project activity will consist of removing the existing less efficient air cooled chillers, heating and domestic hot water systems, and ice making machines and installing an energy efficient geothermal heating, cooling, and refrigeration system as building retrofits at the Escambia County Road Department and Road Prison. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002034.pdf More Documents & Publications CX-003856: Categorical Exclusion Determination

434

CX-007663: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7663: Categorical Exclusion Determination 7663: Categorical Exclusion Determination CX-007663: Categorical Exclusion Determination Construction of a Connector Road Between the Construction Administration Complex (CAC) and the Mixed Oxide Administration Complex (MAC) Parking Lots CX(s) Applied: B1.13 Date: 11/21/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office Mixed Oxide (MOX) Services proposes the construction of a road connecting the Construction Administration Complex (CAC) and the MOX Administration Complex (MAC) parking lots. The approximate dimensions of the proposed connector road are 160 feet in length and 17 feet in width, with a construction limits footprint of 0.4 acre. CX-007663.pdf More Documents & Publications CX-010852: Categorical Exclusion Determination

435

Categorical Exclusion Determinations: Office of Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory August 13, 2010 CX-003365: Categorical Exclusion Determination Advanced Combustion Controls - Enabling Systems and Solutions (ACCESS) for High Efficiency Vehicles...

436

Categorical Exclusion Determinations: National Energy Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 CX-003365: Categorical Exclusion Determination Advanced Combustion Controls - Enabling Systems and Solutions (ACCESS) for High Efficiency Vehicles CX(s) Applied: A9, A11...

437

CX-005636: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination ReplacementInstallation of Physical Access Control System CX(s) Applied: B1.7 Date: 04192011 Location(s): Pittsburgh, Pennsylvania...

438

Categorical Exclusion Determinations: National Energy Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Smart Grid Data Access Utilizing Science, Technology, Engineering, and Mathematics Education as a Catalyst - Phase 1 CX(s) Applied: A9,...

439

Archaeological investigations on the Buckboard Mesa Road Project  

SciTech Connect

In 1986, the Desert Research Institute (DRI) conducted an archaeological reconnaissance of a new alignment for the Buckboard Mesa Road on the Nevada Test Site for the Department of Energy (DOE). During this reconnaissance, several archaeological sites of National Register quality were discovered and recorded including a large quarry, site 26Ny4892, and a smaller lithic scatter, site 26Ny4894. Analysis of the debitage at 26Ny4892 indicates that this area was used primarily as a quarry for relatively small cobbles of obsidian found in the alluvium. Lithic reduction techniques used here are designed for efficiently reducing small pieces of toolstone and are oriented towards producing flake blanks from small cores and bifacially reducing exhausted cores. Projectile point cross references indicate that the area has seen at least casual use for about 10,000 years and more sustained use for the last 3,000 years. Initial obsidian hydration measurements indicate sustained use of the quarry for about the last 3,000 years although the loci of activities appear to change over time. Based on this study, the DRI recommends that quarrying activities in the area of 26Ny4892 are sufficiently sampled and that additional investigations into that aspect of prehistoric activity in the area are not necessary. This does not apply to other aspects of prehistoric use. DRI recommends that preconstruction surveys continue to identify nonquarrying, prehistoric utilization of the area. With the increased traffic on the Buckboard Mesa Road, there is a greater potential for vandalism to sites of National Register-quality located near the road. The DRI recommends that during the orientation briefing the workers at the Test Site be educated about the importance of cultural resources and the need for their protection. 202 refs., 41 figs., 52 tabs.

Amick, D.S.; Henton, G.H.; Pippin, L.C.

1991-10-01T23:59:59.000Z

440

NBP_RFI_Data_Access.PDF | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF More Documents & Publications Silver Spring Networks comments on DOE NBP RFI: Data Access...

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

PIA - Foreign Access Central Tracking System (FACTS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PIA - Foreign Access Central Tracking System (FACTS) PIA - Foreign Access Central...

442

ETTP Security Access Control System (ESACS) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) ETTP Security Access Control System (ESACS) More...

443

USRI Admins Accessing USRI Reports  

E-Print Network (OSTI)

button #12;Step 6: Search by Instructor Search Area Enter: Instructors ID; or Instructors full or partC Access Enter the following: User name, and Password with secure ID#s #12;Step 3: Click on the following: Mandatory Parameters Selections Select Term; Select Course Career; Select Releasable Type; Click

Habib, Ayman

444

Flexible access control for javascript  

Science Conference Proceedings (OSTI)

Providing security guarantees for systems built out of untrusted components requires the ability to define and enforce access control policies over untrusted code. In Web 2.0 applications, JavaScript code from different origins is often combined on a ... Keywords: delimited histories, javascript, same-origin policy, security

Gregor Richards, Christian Hammer, Francesco Zappa Nardelli, Suresh Jagannathan, Jan Vitek

2013-10-01T23:59:59.000Z

445

Inventory and Sediment Modeling of Unpaved Roads for Stream Conservation Planning  

E-Print Network (OSTI)

for the Mapping and Inventory of Riparian Areas in the Upperstudy watershed using the road inventory geodatabase. Oncebe compared to species inventory data, stream bank erosion

Inlander, Ethan; Clingenpeel, Alan; Crump, Michael A.; Van Epps, Matthew; Formica, Sandi

2007-01-01T23:59:59.000Z

446

An integrated approach for precise road reconstruction from aerial imagery and LiDAR data.  

E-Print Network (OSTI)

??Accurate and detailed road models play an important role in a number of geospatial applications, such as infrastructure planning, traffic monitoring, and driver assistance systems. (more)

Jin, Hang

2011-01-01T23:59:59.000Z

447

Categorical Exclusion Determinations: RMOTC | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 6, 2011 August 6, 2011 CX-006696: Categorical Exclusion Determination Maintenance / Grading of Existing Roads and Road Drainages (Barrow Ditches) CX(s) Applied: B1.3 Date: 08/06/2011 Location(s): Casper, Wyoming Office(s): RMOTC August 6, 2011 CX-006711: Categorical Exclusion Determination Reclamation of Decommissioned Batteries, Test Satellites, and Facilities CX(s) Applied: B1.3, B6.1 Date: 08/06/2011 Location(s): Casper, Wyoming Office(s): RMOTC July 13, 2011 CX-006694: Categorical Exclusion Determination Repetitive/Routine Maintenance Activities CX(s) Applied: B1.3 Date: 07/13/2011 Location(s): Casper, Wyoming Office(s): RMOTC June 7, 2011 CX-006692: Categorical Exclusion Determination Work on Existing Well Location (Within 125 Feet from Well Bore) CX(s) Applied: B5.12

448

U.S. DOE Turbine Program Stakeholder Road Mapping Session  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DOE Turbine Program Stakeholder Road Mapping Session U.S. DOE Turbine Program Stakeholder Road Mapping Session July 29-30, 2003 Table of Contents Disclaimer Papers and Presentations Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

449

CX-001380: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1380: Categorical Exclusion Determination 1380: Categorical Exclusion Determination CX-001380: Categorical Exclusion Determination Idaho National Laboratory - Off-Road All Terrain Vehicle Use in Support of Engineering Surveys CX(s) Applied: B3.1 Date: 03/31/2010 Location(s): Idaho Office(s): Idaho Operations Office, Nuclear Energy The proposed action will allow for off-road all terrain vehicle (ATV) use near T-24 and T-25 at the Idaho National Laboratory (INL) Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from the Materials and Fuels Complex (MFC) to other

450

CX-003856: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

856: Categorical Exclusion Determination 856: Categorical Exclusion Determination CX-003856: Categorical Exclusion Determination Road Prison Geothermal Earth Coupled Heating, Ventilation and Air Conditioning (HVAC) Upgrade CX(s) Applied: B5.1 Date: 09/07/2010 Location(s): Escambia County, Florida Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Escambia County is proposing to use Energy Efficiency and Conservation Block Grant (EECBG) American Recovery and Reinvestment (ARRA) funding to remove the existing inefficient air cooled chillers, heating and domestic hot water systems, and ice making machines and install an energy efficient geothermal heating, cooling, and refrigeration system at the Escambia County Road Department and Road Prison. The system will service approximately 25,000 square feet of prison facility. The ground source heat

451

CX-004253: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53: Categorical Exclusion Determination 53: Categorical Exclusion Determination CX-004253: Categorical Exclusion Determination Northwest Natural Devine Road Land Use Review Request CX(s) Applied: B4.9 Date: 10/13/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration In response to the Northwest (NW) Natural Gas Company?s Land Use Review Request (LURR) Bonneville Power Administration (BPA) proposes to grant the NW Natural Gas Company a 10 easement across BPA fee-owned parcels BV-150 and BV-152 for the installation of a 6 inches polyethylene pipeline along Devine Road via digging an open trench at a minimum depth of 42 inches. The pipeline would be installed parallel to and immediately East of Devine Road. The proposal is necessary due to the NW Natural Gas Company Bare Main

452

CX-006791: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6791: Categorical Exclusion Determination 6791: Categorical Exclusion Determination CX-006791: Categorical Exclusion Determination Big Eddy-Chemawa Utility Pole Installation for City of Wilsonville Kinsman Road/Barber Street Extension CX(s) Applied: B4.6 Date: 09/09/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to add one steel pole onto its 230 kilovolt Big Eddy-Chemawa transmission line at the sag between towers 94/2 and 94/3. The addition is to accommodate a City of Wilsonville road project, the Kinsman Road and Barber Street extension projects. All work will be conducted by BPA crews within previously disturbed soils along the existing right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006791.pdf More Documents & Publications

453

SunShot Initiative: Access to Capital  

NLE Websites -- All DOE Office Websites (Extended Search)

Access to Capital to someone by Access to Capital to someone by E-mail Share SunShot Initiative: Access to Capital on Facebook Tweet about SunShot Initiative: Access to Capital on Twitter Bookmark SunShot Initiative: Access to Capital on Google Bookmark SunShot Initiative: Access to Capital on Delicious Rank SunShot Initiative: Access to Capital on Digg Find More places to share SunShot Initiative: Access to Capital on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Access to Capital Photo of a room full of people seated in rows with a few standing in the background. Two hands in the crowd are holding up sheets of paper with 'Like'. Participants at the SunShot Summit breakout session "Big and Small Ideas:

454

Gender and lexical access in Bulgarian  

E-Print Network (OSTI)

Two procedures were used to explore the effects of semantic and grammatical gender on the recognition and processing of Bulgarian nouns, in relation to other factors that are known to affect lexical access. This study in a three-gender language was modeled on previous work in Italian, a two-gender language (Bates, Devescovi, Pizzamiglio, DAmico, & Hernandez, 1995). Words were presented auditorily in randomized lists in two tasks: (1) repeat the word as quickly as possible and (2) determine the grammatical gender of the noun as soon as possible and indicate the decision by pressing a button. Reaction times in both tasks were influenced by phonological factors, word frequency, and irregularity of gender marking, but semantic and grammatical gender affected only gender monitoring. The significant contribution of semantic gender to processing in Bulgarian contrasts with previous findings for Italian. Also, we obtained an interaction between sex of the subject and noun gender, reflecting a bias toward ones own grammatical gender counterpart (especially for females). Reanalysis of the prior study in Italian showed a similar interaction but confirmed no effects of the semantic gender of the noun, suggesting that these two natural gender effects can dissociate. Possible reasons for cross-linguistic differences are discussed, with implications for comparative studies of gender and lexical access. Recently, there has been a surge of interest in the nature

Elena Andonova; Antonella Devescovi

2004-01-01T23:59:59.000Z

455

Non-road Electric Transportation Industry Advisory Council: July 28-29, 2009 Meeting Proceedings  

Science Conference Proceedings (OSTI)

EPRI's Non-road Electric Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's July 28-29, 2009 meeting included stakeholders from utilities, public agencies and manufacturers. The presentations dealt with batteries, lift trucks, utility vehicles, agriculture vehicles, and ground support equipment.

2009-10-01T23:59:59.000Z

456

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 3 (Riverside) Sajal S., Suite 140 Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area sensing study in the Los Angeles, CA area. The remote sensor used in this study is capable of measuring

Denver, University of

457

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 1 Gary A. Bishop a nine-day remote sensing study in the Los Angeles, CA area in the summer of 1999. The remote sensor used study to characterize motor vehicle emissions and deterioration in the Los Angeles area. On-Road Remote

Denver, University of

458

ON-ROAD REMOTE SENSING OF CO AND HC EMISSIONS IN CALIFORNIA  

E-Print Network (OSTI)

#12;ON-ROAD REMOTE SENSING OF CO AND HC EMISSIONS IN CALIFORNIA Final Report Contract No. A032 in fulfillment of A032-093, On-Road Remote Sensing of CO and HC Emissions in California by the University to accelerations and cruises entering a freeway ramp at highway speeds. The remote sensing device measures the CO

Denver, University of

459

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 5, November 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Phoenix, AZ area in the fall of 2004. The remote sensor used in this study

Denver, University of

460

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 4 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 4 2 EXECUTIVE SUMMARY The University of Denver has completed the first four years of a multi-year remote sensing

Denver, University of

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 Mitchell J. Williams 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the LaBrea Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

462

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 5, September 2002 Gary A five years of a multi-year remote sensing study in the Chicago area, with measurements made as to the extent I/M programs and #12;On-Road Remote Sensing in the Chicago Area: Year 5 2 special fuels contribute

Denver, University of

463

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 4, January 2003 Daniel A year of a multi-year remote sensing study in the Denver area. The remote sensor used in this study channel was somewhat significant. #12;On-Road Remote Sensing in the Denver Area: Year 4 2 INTRODUCTION

Denver, University of

464

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

465

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 5, January 2005 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing of Automobile-day remote sensing study in the Denver, CO area in the winter of 2005. The remote sensor used in this study

Denver, University of

466

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 2 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the second year of a five-year remote sensing study

Denver, University of

467

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6, January 2007 Gary A 80208 June 2007 #12;On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 6 1 EXECUTIVE SUMMARY The University of Denver conducted a three-day remote sensing study in the Denver, CO area

Denver, University of

468

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 3 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022-8246 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the first three years of a five-year remote sensing

Denver, University of

469

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 Sajal S. Pokharel, Gary Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 2 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing

Denver, University of

470

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 1 Gary A. Bishop, Sajal S-day remote sensing study in the Phoenix, AZ area in the fall of 1998. The remote sensor used in this study selected for 1999. On-Road Remote Sensing in the Phoenix Area: Year 1 2 #12;INTRODUCTION Many cities

Denver, University of

471

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 1 Peter J. Popp, Gary A, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 1 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Chicago area in the fall

Denver, University of

472

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Los Angeles Area: Year 2 Sajal S. Pokharel Alpharetta, GA. 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the Los Angeles Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted the second year of a five year remote sensing study

Denver, University of

473

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 3 Sajal S. Pokharel, Gary A Alpharetta, Georgia 30022 CRC Project No. E-23-4 #12;On-Road Remote Sensing in the Denver Area: Year 3 2 EXECUTIVE SUMMARY The University of Denver has completed the third year of a multi-year remote sensing study

Denver, University of

474

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 6, September 2004 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing in the Chicago Area-year remote sensing study in the Chicago area, with measurements made in September of 1997 through 2000, 2002

Denver, University of

475

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the La Brea Area: Year 3, October 2003 Gary A, Suite 140 Alpharetta, Georgia 30022 Contract No. E-23-4 #12;On-Road Remote Sensing in the La Brea Area: Year 3 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the La

Denver, University of

476

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Denver Area: Year 1 Peter J. Popp, Sajal S Center Parkway Atlanta, Georgia 30346 CRC Project No. E-23-4-99 #12;On-Road Remote Sensing in the Denver-year remote sensing study in the Denver area. The remote sensor used in this study is capable of measuring

Denver, University of

477

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Chicago Area: Year 2 Peter J. Popp, Gary A Atlanta, Georgia 30346 Contract No. E-23-4 #12;On-Road Remote Sensing in the Chicago Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver has completed the first two years of a five-year remote sensing

Denver, University of

478

On-Road Remote Sensing of Automobile Emissions in west Los Angeles: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in west Los Angeles: Year 4, October 2005 Gary A Alpharetta, Georgia 30022 Contract No. E-23-9 #12;On-Road Remote Sensing in west Los Angeles: Year 4 1 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in west Los Angeles

Denver, University of

479

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4, November 2002 Gary A conducted a five-day remote sensing study in the Phoenix, AZ area in the fall of 2002. The remote sensor #12;On-Road Remote Sensing of Automobile Emissions in the Phoenix Area: Year 4 2 by 5 years

Denver, University of

480

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2,  

E-Print Network (OSTI)

On-Road Remote Sensing of Automobile Emissions in the Omaha Area: Year 2, September 2004 Gary A of the work. #12;On-Road Remote Sensing in the Omaha Area: Year 2 2 EXECUTIVE SUMMARY The University of Denver conducted a five-day remote sensing study in the Omaha, Nebraska area in September of 2004. The remote

Denver, University of

Note: This page contains sample records for the topic "determination access road" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Baroclinic instability of the Silk Road pattern induced by thermal damping  

Science Conference Proceedings (OSTI)

In this paper, the internal dynamics of the Silk Road pattern has been studied. Since observation indicates that the Silk Road pattern could be considered as stationary external Rossby waves, the quasi-geostrophic three-layer model has been used ...

Guosen Chen; Ronghui Huang; Liantong Zhou

482

Non-road Industry Advisory Council: August 26-27, 2008 Meeting  

Science Conference Proceedings (OSTI)

EPRI's Non-Road Transportation Industry Advisory Council brings together industry's stakeholders to promote non-road electrification. The Council's August 26-27, 2008 meeting included stakeholders from utilities, public agencies and manufacturers. The presentations dealt with batteries, lift trucks, utility vehicles, agriculture vehicles, and ground support equipment.

2008-10-16T23:59:59.000Z

483

Market Assessments of Non-Road Electrotechnologies for Air Quality Improvement  

Science Conference Proceedings (OSTI)

Past studies conducted by the Electric Power Research Institute (EPRI) and ICF International (ICF) have revealed opportunities to reduce emissions and fuel consumption of non-road vehicles and stationary goods-moving equipment by converting them to electric drive. These studies have shown that electrically driven non-road equipment can lessen the environmental impact of user operations and reduce end-user ...

2012-09-30T23:59:59.000Z

484

A Simulation Tool for Combined Rail-Road Transport in Intermodal Terminals  

E-Print Network (OSTI)

A Simulation Tool for Combined Rail-Road Transport in Intermodal Terminals Andrea E. Rizzoli the current flows of freight. On the other side, the growth of freight transport shows a rapidly increasing by road and rail gates and by a set of platforms. Intermodal terminals are inter-connected by rail

Gambardella, Luca Maria

485

Rules of the Road for Users of Smithsonian Computers and Networks  

E-Print Network (OSTI)

Rules of the Road for Users of Smithsonian Computers and Networks Introduction Smithsonian systems, networks and other computer resources are shared among Smithsonian employees, interns, visiting scholars the Internet. The Rules of the Road are intended to help you use the Smithsonian's computing and network

Mathis, Wayne N.

486

Toolkit for Public-Private Partnerships in Roads and Highways | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Toolkit for Public-Private Partnerships in Roads and Highways Jump to: navigation, search Tool Summary Name: Toolkit for Public-Private Partnerships in Roads and Highways Agency/Company /Organization: World Bank Sector: Energy Focus Area: Transportation Resource Type: Guide/manual User Interface: Website Website: www.ppiaf.org/ppiaf/sites/ppiaf.org/files/documents/toolkits/highwayst Cost: Free Toolkit for Public-Private Partnerships in Roads and Highways Screenshot References: Toolkit for Public-Private Partnerships in Roads and Highways[1] "The Toolkit for Public-Private Partnership in Roads and Highways is to

487

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

488

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD  

NLE Websites -- All DOE Office Websites (Extended Search)

DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT FOR THE MULTIPURPOSE HAUL ROAD WITHIN THE IDAHO NATIONAL LABORATORY SITE (EM-FMDP-I0-068) Agency: U. S. Department of Energy (DOE) Action: Finding of No Significant Impact (FONSI) Summary: The DOE prepared a Draft Environmental Assessment (EA) for the proposed "Environmental Assessment for the Multipurpose Haul Road Within the Idaho National Laboratory Site" (DOE/EA-I772). The proposed action consists of constructing a road for limited year-round use with the ability for trucks traveling in opposite directions to pass. The analysis of the proposed road evaluates clearing and grading a base, installing necessary culverts and drainage, and placing and compacting gravel for the roadway. The haul road would be used to:

489

USVI Energy Road Map: Charting the Course to a Clean Energy Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USVI Energy Road Map: Charting the Course to a Clean Energy Future USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands This brochure provides an overview of the integrated clean energy deployment process and progress of the Energy Development in Island Nations U.S. Virgin Islands pilot project road map, including over-arching goals, organization, strategy, technology-specific goals and accomplishments, challenges, solutions, and upcoming milestones. edinusvi_roadmap.pdf More Documents & Publications U.S. Virgin Islands Energy Road Map: Analysis Integrating Renewable Energy into the Transmission and Distribution System

490

An Access Definition and Query Language : Towards a Unified Access Control Model.  

E-Print Network (OSTI)

??In this work we suggest a meta access control model emulating established access control models by configuration and offering enhanced features like the delegation of (more)

Sonnenbichler, Andreas

2013-01-01T23:59:59.000Z

491

Harmonization of Road Signs for Electric Vehicle Charging Stations  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Avenue Louise 200 Box 113 1050 Brussels Belgium 1 Avenue Louise 200 Box 113 1050 Brussels Belgium 1 32.2.647.3218 Mobile 32.473.284.603 jseisler@cleanfuelsconsulting.org www.cleanfuelsconsulting.org Harmonization