Powered by Deep Web Technologies
Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Detailed Execution Planning for Large Oil and Gas Construction Projects  

E-Print Network [OSTI]

Detailed Execution Planning for Large Oil and Gas Construction Projects Presented by James Lozon, University of Calgary There is currently 55.8 billion dollars worth of large oil and gas construction projects scheduled or underway in the province of Alberta. Recently, large capital oil and gas projects

Calgary, University of

2

Developing Standard Logic for a Detailed Engineering Project Schedule in the Process Industry  

E-Print Network [OSTI]

Planning Meeting (IPPM) for a standard detailed engineering project in the process industry will be used to develop scheduling logic for use in developing detail engineering project schedules. However, because the IPPM does not clearly distinguish...

Miller-Karns, Kara A.

2009-05-15T23:59:59.000Z

3

Detailed project description: Turbulence and Dynamo in Accretion Flows  

E-Print Network [OSTI]

Andreas Svedin (visitor) 2 Scientific content The overall goal of this project is to understand the origin

Brandenburg, Axel

4

Baca geothermal demonstration project. Power plant detail design document  

SciTech Connect (OSTI)

This Baca Geothermal Demonstration Power Plant document presents the design criteria and detail design for power plant equipment and systems, as well as discussing the rationale used to arrive at the design. Where applicable, results of in-house evaluations of alternatives are presented.

Not Available

1981-02-01T23:59:59.000Z

5

Research Project Awards are available to Graduate and Under-  

E-Print Network [OSTI]

Research Project Awards are available to Graduate and Under- graduate Students on a competi- tive basis. Research Project Award funds assist students to carry out independent research projects. Recent Research Pro- ject Award Winners include: Lisha Berzins PhD candi- date (NRES) for her project: Female

Bolch, Tobias

6

Research Project Awards are available to Graduate and Under-  

E-Print Network [OSTI]

Research Project Awards are available to Graduate and Under- graduate Students on a competi- tive in Prince George and is currently the Green University Project Manager at UNBC. UNBC OFFICE OF GRADUATE Annual UNBC Graduate Conference 2 Convocation 2011 2 Congratulations Research Project Award Winners

Bolch, Tobias

7

Project Analysis under Sustainability* by Richard T. Woodward  

E-Print Network [OSTI]

Project Analysis under Sustainability* by Richard T. Woodward Department of Agricultural Economics to this paper. The editorial assistance of Michele Zinn is gratefully acknowledged. #12;Project Analysis under on and demonstrates linkages between these approaches. First, we derive benefit-cost type criteria for marginal

Woodward, Richard T.

8

Materials Modification Under Ion Irradiation: JANNUS Project  

SciTech Connect (OSTI)

JANNUS (Joint Accelerators for Nano-Science and Nuclear Simulation) is a project designed to study the modification of materials using multiple ion beams and in-situ TEM observation. It will be a unique facility in Europe for the study of irradiation effects, the simulation of material damage due to irradiation and in particular of combined effects. The project is also intended to bring together experimental and modelling teams for a mutual fertilisation of their activities. It will also contribute to the teaching of particle-matter interactions and their applications. JANNUS will be composed of three accelerators with a common experimental chamber and of two accelerators coupled to a 200 kV TEM.

Serruys, Y.; Trocellier, P. [CEA-Saclay, DEN/DMN/SRMP, 91191 Gif-sur-Yvette Cedex (France); Ruault, M.-O.; Henry, S.; Kaietasov, O. [CSNSM, Bat. 104, Orsay Campus (France); Trouslard, Ph. [INSTN, CEA-Saclay, 91191 Gif-sur-Yvette Cedex (France)

2004-12-01T23:59:59.000Z

9

28. Project Unit 04-025. Detailed Investigation of Chemical and Microbiological Parameters Over  

E-Print Network [OSTI]

and Hattori 2008) and are suspected to form over bitumen and coal (Hamilton, Burt et al. 2004). However, field are centred on large accumulations of shallow methane (Hamilton, Burt et al. 2004). The current project takes in the formation of the rings themselves. Two methane- and one hydrogen sulphide-centred forest rings, referred

10

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate  

SciTech Connect (OSTI)

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

NONE

1995-09-01T23:59:59.000Z

11

A REACTIVE APPROACH FOR MINING PROJECT EVALUATION UNDER PRICE UNCERTAINTY  

E-Print Network [OSTI]

deterministic forward commodity price which, in most cases, historical data demonstrates to be quite volatileA REACTIVE APPROACH FOR MINING PROJECT EVALUATION UNDER PRICE UNCERTAINTY Meimei Zhang and operating cash flow. This industry is usually considered high risk because of historically volatile

Duffy, Ken

12

Project funded under the Socio-economic Sciences and Humanities  

E-Print Network [OSTI]

1 Project funded under the Socio-economic Sciences and Humanities Can home ownership contribute real increases everywhere. What this translates into, in terms of an exact amount of housing wealth. Over the EU25 as a whole, housing equity is some 40 per cent higher than total GDP, the figure being

Birmingham, University of

13

Will simplified modalities and procedures make more smallscale forestry projects viable under the Clean Development Mechanism?  

E-Print Network [OSTI]

1 Will simplified modalities and procedures make more smallscale forestry projects viable under and procedures make more smallscale forestry projects viable under the Clean Development Mechanism? Mitigation modalities and procedures (M&P) are expected to increase the viability of smallscale project activities

Paris-Sud XI, Université de

14

Project funded by the European Union under the 7th Framework Programme  

E-Print Network [OSTI]

Project cost: 4,287,529 Project funding: 3,424,534 Max-Planck-Institut für biologische Kybernetik #12Project funded by the European Union under the 7th Framework Programme http://www.mycopter.eu my a Personal Aerial Transportation System (PATS) #12;http://www.mycopter.eu Rationale for the project Money

15

Stochastic dominance for project screening and selection under uncertainty  

E-Print Network [OSTI]

At any given moment, engineering and chemical companies have a host of projects that they are either trying to screen to advance to the next stage of research or select from for implementation. These choices could range ...

Adeyemo, Adekunle M

2013-01-01T23:59:59.000Z

16

Wind Energy Research Project under the 6th Framework Programme Peter Hjuler Jensen, Ris National Laboratory,  

E-Print Network [OSTI]

UpWind Wind Energy Research Project under the 6th Framework Programme Peter Hjuler Jensen, Risø National Laboratory, Denmark 1. Abstract. The paper presents the until now largest EU wind energy research of the project and dissemination of results. 2. Objectives UpWind develops and verify substantially improved

17

Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and its application to mature Minnelusa waterfloods. Annual report for the period January 1993--December 1993  

SciTech Connect (OSTI)

The combination of an interfacial tension agent and a mobility control agent has the potential to produce additional oil beyond a waterflood. The West Kiehl alkaline-surfactant-polymer project is the most advanced application of this chemical enhanced oil recovery technique. The West Kiehl alkaline-surfactant-polymer flood was initiated in September 1987 as a secondary application after primary recovery. A preliminary analysis of the West Kiehl alkaline-surfactant-polymer flood indicates that incremental oil of 20% of the original stock tank oil in place will be produced above waterflooding. The cost of the incremental oil will be less than $2.50 per incremental barrel. A statistical analysis of approximately 120 Minnelusa oil fields in the Powder River Basin indicates that the original stock tank oil in place exceeds one billion barrels. If the enhanced oil recovery technology implemented at West Kiehl field could be successfully applied to these fields, the potential incremental oil recovery would approach 200 million barrels. {open_quotes}Detailed Evaluation of the West Kiehl Alkaline-Surfactant-Polymer Field Project and Its Application to Mature Minnelusa Waterfloods{close_quotes} objective is to evaluate both the field performance of the alkaline-surfactant-polymer enhanced oil recovery technology as well as its potential application to other Minnelusa oil fields.

Pitts, M.J.; Surkalo, H.; Mundorf, W.R.

1994-11-01T23:59:59.000Z

18

Winds of change?: Projections of near-surface winds under climate change scenarios  

E-Print Network [OSTI]

a downscaling technique to generate probability distributions of wind speeds at sites in northern Europe on renewable energy resources including wind-power. 2. Data [4] Ten coupled Global Climate Models (GCMs) fromWinds of change?: Projections of near-surface winds under climate change scenarios S. C. Pryor,1 J

Pryor, Sara C.

19

Singularity of projections of 2-dimensional measures invariant under the geodesic flow  

E-Print Network [OSTI]

We show that on any compact Riemann surface with variable negative curvature there exists a measure which is invariant and ergodic under the geodesic flow and whose projection to the base manifold is 2-dimensional and singular with respect to the 2-dimensional Lebesgue measure.

Risto Hovila; Esa Jrvenp; Maarit Jrvenp; Franois Ledrappier

2011-04-14T23:59:59.000Z

20

Current Research Interests of Prof. Jorge Gomes (For further details and enquiries for Graduate and PostDoctoral Research opportunities in the projects  

E-Print Network [OSTI]

for Graduate and PostDoctoral Research opportunities in the projects listed below, please contact Prof. Gomes

Williams, John M.

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Embedding methods for massing and detail design in computer generated design of skyscrapers  

E-Print Network [OSTI]

This thesis proposes a new digital system to construct the massing and details of skyscrapers. It extracts underlying rules and design conventions from significant projects in contemporary skyscraper design practice. These ...

Chen, Shouheng, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

22

Computed tomography:the details.  

SciTech Connect (OSTI)

Computed Tomography (CT) is a well established technique, particularly in medical imaging, but also applied in Synthetic Aperture Radar (SAR) imaging. Basic CT imaging via back-projection is treated in many texts, but often with insufficient detail to appreciate subtleties such as the role of non-uniform sampling densities. Herein are given some details often neglected in many texts.

Doerry, Armin Walter

2007-07-01T23:59:59.000Z

23

Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project  

SciTech Connect (OSTI)

This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

A. B. Culp

2007-01-26T23:59:59.000Z

24

Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project  

SciTech Connect (OSTI)

This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

S. L. Reno

2006-10-26T23:59:59.000Z

25

Development of a Toolkit for Calculating Linear, ChangePoint Linear and MultipleLinear Inverse Building Energy Analysis Models, ASHRAE Research Project 1050-RP, Detailed Test Results  

E-Print Network [OSTI]

data file (.DAT). Each SAS run contains a procedure file (.SAS) and an output file (.LST) and also shares the same data file as IMT. For each PRISM run, there are three files included: a weather file (.TPS), a data file or meter file (.MTR..., there are three files included: a weather file (.TPS), a data file or meter file (.MTR), and an output file (.DOC). The ?Status? column summarized the results of IMT as compared to other programs used. In Table 1.2, the detailed results from the IMT bounds...

Sreshthaputra, A.; Haberl, J. S.; Claridge, D. E.

2001-01-01T23:59:59.000Z

26

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

SciTech Connect (OSTI)

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

27

A detailed chemical analysis of changes to bitumen produced by the in situ combustion process at the oxygen Wolf Lake Project, Alberta. Part 11; Whole oil samples  

SciTech Connect (OSTI)

The detailed chemical changes in bitumen brought about over a one year period by a in situ combustion process in an oil sands reservoir have been investigated. Relative to a core sample, the fireflood-produced oils exhibited a significant reduction in density and viscosity which began early in the production cycle. This behavior was correlated with a marked increase in material boiling in the naphtha and middle distillate ranges and a concomitant decrease in the residue cut. The sulfur and nitrogen contents in the produced oils decreased relative to the core sample. A reduction in the acid number of the produced oil samples was coupled with an increase in the oxygen content as the fireflood proceeded. In this paper the relationship between these changes and the dynamics of the in situ combustion process are discussed.

Alex, R.F.; Fuhr, B.; Reichert, C. (Alberta Research Council, Oil Sands and Hydrocarbon Recovery, Edmonton, Alberta T6H 5X2 (CA))

1992-01-01T23:59:59.000Z

28

Detailed evaluation of the West Kiehl alkaline-surfactant-polymer field project and it`s application to mature Minnelusa waterfloods. Technical progress report, January--March 1993  

SciTech Connect (OSTI)

The objective of this report is to (1) quantify the incremental oil produced from the West Kiehl alkaline-surfactant-polymer project by classical engineering and numerical simulation techniques,(2) to quantify the effect of chemical slug volume injection on incremental oil in the two swept areas of the field, (3) to determine the economic ramifications of the application of the alkaline-surfactant-polymer technology, (4) to forecast the results of injecting an alkaline-surfactant-polymer solution to mature waterfloods and polymer floods, and (5) to provide the basis for independent operators to book additional oil, reserves by using the alkaline-surfactant-polymer technology. This report document the initial geological and reservoir engineering data gathering. In addition, some of the initial laboratory results are discussed. Some evaluation of the West Kiehl has been published.

Pitts, M.J.

1993-06-01T23:59:59.000Z

29

Water Transit Authority Project WTA #02-112 under Sub Contract to ABS Consulting Maritime Simulation Model  

E-Print Network [OSTI]

Simulation Model of San Francisco Bay Modeling Overview Corresponding Author: J. Rene van Dorp, Assistant COMMONWEALTH UNIVERSITY JASON R.W. MERRICK #12;Maritime Simulation Model of San Francisco Bay GWU ­ VCU 2002 Simulation Model of San Francisco Bay GWU ­ VCU 2002 Modeling Overview WTA Project #02-112 under Sub Contract

van Dorp, Johan René

30

Auburn University Infrastructure ARRA Project List Certified Under Section 1511 of the Recovery Act  

E-Print Network [OSTI]

Revised Grant/Program Project Description Project Cost SFSF10-1334A Campus Lighting System- security Draughn Library on Main Campus. Assistance related to Writing Center location (921905) Completed April; Emergency Telephone/Radio system; T-3 Vehicle; Noah Weather Radios for campus; Tables & Chairs; Projectors

Tam, Tin-Yau

31

Property:Project Details | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacity Jump to: navigation, search PropertyTransfer Method JumpCity Jump

32

Composting projects under the Clean Development Mechanism: Sustainable contribution to mitigate climate change  

SciTech Connect (OSTI)

The Clean Development Mechanism (CDM) of the Kyoto Protocol aims to reduce greenhouse gas emissions in developing countries and at the same time to assist these countries in sustainable development. While composting as a suitable mitigation option in the waste sector can clearly contribute to the former goal there are indications that high rents can also be achieved regarding the latter. In this article composting is compared with other CDM project types inside and outside the waste sector with regards to both project numbers and contribution to sustainable development. It is found that, despite the high number of waste projects, composting is underrepresented and a major reason for this fact is identified. Based on a multi-criteria analysis it is shown that composting has a higher potential for contribution to sustainable development than most other best in class projects. As these contributions can only be assured if certain requirements are followed, eight key obligations are presented.

Rogger, Cyrill [Department for Management, Technology, and Economics, ETH Zurich, Kreuzplatz 5, 8032 Zurich (Switzerland); Beaurain, Francois [South Pole Carbon Asset Management Ltd., Switzerland, Technoparkstr. 1, 8005 Zurich (Switzerland); Schmidt, Tobias S., E-mail: tobiasschmidt@ethz.ch [Department for Management, Technology, and Economics, ETH Zurich, Kreuzplatz 5, 8032 Zurich (Switzerland)

2011-01-15T23:59:59.000Z

33

Integrating ecophysiology and plankton dynamics into projected changes in maximum fisheries catch potential under climate  

E-Print Network [OSTI]

). In addition, average surface water pH of the ocean has dropped by 0.1 units since pre- industrial timesIntegrating ecophysiology and plankton dynamics into projected changes in maximum fisheries catch 7TJ, UK 2 Centre for Environment, Fisheries and Aquaculture Science, Pakefield Road, Lowestoft

Pauly, Daniel

34

Projected freshwater withdrawals in the United States under a changing climate  

E-Print Network [OSTI]

withdrawals in the United States under a changing climate, Water Resour. Res., 49, doi:10.1002/wrcr.20076. 1. Introduction [2] Offstream water use in the United States increased over 10-fold during the twentieth century future water use in the United States assuming that water supply will be no less limiting to future

Ramírez, Jorge A.

35

Detailed search Miscellaneous  

E-Print Network [OSTI]

Search Go Detailed search Miscellaneous Press sources (PhysicsWeb.org) Based on information from press sources (PhysicsWeb.org) Scientific Research; Nuclear Fusion; Renewable Sources of Energy

36

Development of advanced blanket performance under irradiation and system integration through JUPITER-II project  

SciTech Connect (OSTI)

This report describes an outline of the activities of the JUPITER-II collaboration (japan-USA program of Irradiation/Integration test for Fusion Research-II), Which has bee carried out through six years (2001-2006) under Phase 4 of the collabroation implemented by Amendment 4 of Annex 1 to the DOE (United States Department of Energy)-MEXT (Ministry of Education ,Culture,Sports,Science and Technology) Cooperation. This program followed the RTNS-II Program (Phase1:1982-4986), the FFTF/MOTA Program (Phase2:1987-1994) and the JUPITER Program (Phase 3: 1995-2000) [1].

Abe, Katsunori; Kohyama, Akira; Tanaka, Satoru; Namba, C.; Terai, T.; Kunugi, T.; Muroga, Takeo; Hasegawa, Akira; Sagara, A.; Berk, S.; Zinkle, Steven J.; Sze, Dai Kai; Petti, D. A.; Abdou, Mohamed A.; Morley, Neil B.; Kurtz, Richard J.; Snead, Lance L.; Ghoniem, Nasr M.

2008-12-01T23:59:59.000Z

37

Attention to Detail | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis Aerosol STATEMENTAttention to Detail

38

Position Summary Employee Details  

E-Print Network [OSTI]

and/or colleges. Positions Supervised: N/A Essential Responsibilities: 40% PROPOSALS Review proposals-recipient. Interpret sponsor guidelines, policies and regulations and ensure proper retention and timely disposition the Office of Sponsored Programs. Assist with special projects as assigned. Physical Demands: W

Schladow, S. Geoffrey

39

Position Summary Employee Details  

E-Print Network [OSTI]

. Positions Supervised: N/A Essential Responsibilities: 40% Proposals: Review proposals and related documents-recipient. Interpret sponsor guidelines, policies and regulations and ensure proper retention and timely disposition the Office of Sponsored Programs. Assist with special projects as assigned. Physical Demands: Work

Schladow, S. Geoffrey

40

1992 CBECS Detailed Tables  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved Reserves (Billion Cubic Feet)WyomingSquare Feet 50,001.6.A.0.EastDetailed

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Crosswell Seismic Amplitude-Versus-Offset for Detailed Imaging of Facies and Fluid Distribution within Carbonate Oil Reservoirs  

E-Print Network [OSTI]

Crosswell Seismic Amplitude-Versus-Offset for Detailed Imaging of Facies and Fluid Distribution within Carbonate Oil Reservoirs DOE Award Number: DE-FC26-04NT15508 Oct 2004 - Sep 2007 Michigan in carbonate reef reservoirs that are currently under production. This project will develop, test

42

Ancillary-service details: Dynamic scheduling  

SciTech Connect (OSTI)

Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

Hirst, E.; Kirby, B.

1997-01-01T23:59:59.000Z

43

RENDERING FILTERS FOR CONTROLLING DETAIL AND  

E-Print Network [OSTI]

RENDERING FILTERS FOR CONTROLLING DETAIL AND CREATING EFFECTS CHRISTOPHER ROBERT DECORO may be unified under the general theme of the rendering filter. Generally stated, such a filter is a passive, stateless operator that acts upon a decomposition of terms in the rendering equation

44

Water Transit Authority Project WTA #02-112 under Sub Contract to ABS Consulting Maritime Simulation Model  

E-Print Network [OSTI]

Simulation Model of San Francisco Bay Explanation of Exposure Results Corresponding Author: J. Rene van Dorp.P. BLACKFORD VIRGINIA COMMONWEALTH UNIVERSITY JASON R.W. MERRICK #12;Maritime Simulation Model of San Francisco;Maritime Simulation Model of San Francisco Bay GWU ­ VCU 2002 Explanation of Analysis Results WTA Project

van Dorp, Johan René

45

Curriculum Vitae: Susanne Friederike Viefers Personal details  

E-Print Network [OSTI]

. Coordinator of NFR project ``Quantum Hall physics in the 2D electron gas and in rotating Bose condensates include studying condensates of such particles, which might give rise to a new class of non-Abelian states. · Quantum Hall physics in rapidly rotating atomic Bose condensates. Dilute, ultracold atomic gases under

Johansen, Tom Henning

46

Energy Efficiency Project Development  

SciTech Connect (OSTI)

The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

IUEP

2004-03-01T23:59:59.000Z

47

Structural concepts and details for seismic design  

SciTech Connect (OSTI)

This manual discusses building and building component behavior during earthquakes, and provides suggested details for seismic resistance which have shown by experience to provide adequate performance during earthquakes. Special design and construction practices are also described which, although they might be common in some high-seismic regions, may not be common in low and moderate seismic-hazard regions of the United States. Special attention is given to describing the level of detailing appropriate for each seismic region. The UBC seismic criteria for all seismic zones is carefully examined, and many examples of connection details are given. The general scope of discussion is limited to materials and construction types common to Department of Energy (DOE) sites. Although the manual is primarily written for professional engineers engaged in performing seismic-resistant design for DOE facilities, the first two chapters, plus the introductory sections of succeeding chapters, contain descriptions which are also directed toward project engineers who authorize, review, or supervise the design and construction of DOE facilities. 88 refs., 188 figs.

Not Available

1991-09-01T23:59:59.000Z

48

Cooperative Education Detailed Operational Procedures  

E-Print Network [OSTI]

credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

de Doncker, Elise

49

Final Detailed Measurement Program Plan Detailed Measurement Program Plan  

E-Print Network [OSTI]

by TrueWind Solutions, LLC Albany, New York for California Energy Commission Sacramento, California was developed by TrueWind Solutions, hereon referred to as TrueWind, to guide Task 4 of the Wind Energy Resource Modeling and Measurement Project, contact number 500-03-006, with the California Energy Commission

50

Submission of Notice of Termination of Coverage Under the National Pollutant Discharge Elimination System General Permit No. CAS000002 for WDID No. 201C349114, Lawrence Livermore National Laboratory Ignition Facility Construction Project  

SciTech Connect (OSTI)

This is the completed Notice of Termination of Coverage under the General Permit for Storm Water Discharges Associated with Construction Activity. Construction activities at the National Ignition Facility Construction Project at Lawrence Livermore National Laboratory are now complete. The Notice of Termination includes photographs of the completed construction project and a vicinity map.

Brunckhorst, K

2009-04-21T23:59:59.000Z

51

Detailed project description: Astrophysical turbulence and dynamo action  

E-Print Network [OSTI]

professor ) Dr Sharanya Sur (regular visitor) Mr Andreas Svedin (regular visitor) 2 Scientific content

Brandenburg, Axel

52

Idaho's Advanced Mixed Waste Treatment Project Details 2013Accomplish...  

Energy Savers [EERE]

Articles A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. Innovative Technique Accelerates Waste Disposal at Idaho Site Only the...

53

Detailed project description: Astrophysical turbulence and dynamo action  

E-Print Network [OSTI]

D student, Licentiate 19 May 2014) Ms Illa R. Losada (PhD student, Licentiate 5 December 2014) Dr Nishant

Brandenburg, Axel

54

Idaho's Advanced Mixed Waste Treatment Project Details 2013  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS CableDepartment of Energy ReportingIanIdaho1i

55

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

56

Improving alternative fuel utilization: detailed kinetic combustion...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Improving alternative fuel utilization: detailed kinetic combustion modeling & experimental testing Improving alternative fuel utilization: detailed kinetic combustion modeling &...

57

Clemson University Detailed Assessment Report  

E-Print Network [OSTI]

, and Action Plans O 1: Oral and written communication skills Upon graduation, students will be able Priorities 1.1 Excel in teaching at both the undergraduate and graduate levels 3.2 Promote high graduation in their classes and through a test preparation session on written communication skills. M 2: Oral capstone project

Bolding, M. Chad

58

Radiation Embrittlement Archive Project  

SciTech Connect (OSTI)

The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

Klasky, Hilda B [ORNL] [ORNL; Bass, Bennett Richard [ORNL] [ORNL; Williams, Paul T [ORNL] [ORNL; Phillips, Rick [ORNL] [ORNL; Erickson, Marjorie A [ORNL] [ORNL; Kirk, Mark T [ORNL] [ORNL; Stevens, Gary L [ORNL] [ORNL

2013-01-01T23:59:59.000Z

59

CSCE4610: Project Grading Sheet (Krishna Kavi)  

E-Print Network [OSTI]

CSCE4610: Project Grading Sheet (Krishna Kavi) Assumption: A report on one or more commercially available architecture Student Name: _____________________________________________ Project Title. are used to determine the difficulty of the project 2. Project Details 60% Completeness Identification

Kavi, Krishna

60

Crump Geyser: High Precision Geophysics & Detailed Structural...  

Broader source: Energy.gov (indexed) [DOE]

Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well...

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

62

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

63

Acoustic emission monitoring for assessment of steel bridge details  

SciTech Connect (OSTI)

Acoustic emission (AE) testing was deployed on details of two large steel Interstate Highway bridges: one cantilever through-truss and one trapezoidal box girder bridge. Quantitative measurements of activity levels at known and suspected crack locations were made by monitoring AE under normal service loads (e.g., live traffic and wind). AE indications were used to direct application of radiography, resulting in identification of a previously unknown flaw, and to inform selection of a retrofit detail.

Kosnik, D. E.; Corr, D. J. [Infrastructure Technology Institute, Northwestern University, Evanston, IL 60208 (United States); Hopwood, T. [Kentucky Transportation Center, University of Kentucky, Lexington, KY 40506 (United States)

2011-06-23T23:59:59.000Z

64

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

65

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

66

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

67

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

68

PARS II Process Document On Hold Projects  

Broader source: Energy.gov [DOE]

This document details the process approved by the CRB for placing Capital Asset projects on hold, re-activating on hold projects, and cancelling on hold projects. It applies to Active Capital...

69

Licensing plan for UMTRA project disposal sites. Final [report  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

Not Available

1993-09-01T23:59:59.000Z

70

DOE cost-shared in situ combustion projects revisited  

SciTech Connect (OSTI)

As part of its enhanced oil recovery (EOR) program, the US Department of Energy (DOE) and its predecessor organizations sponsored several cost-shared in situ combustion projects in the 1960s and 1970s. The goal of these projects was to evaluate the technical and economic feasibility of in situ combustion as a thermal oil recovery technique and provide information in the public domain as a means of reducing the risks associated with these high cost ventures. This study reviewed specific features of the cost-shared demonstration and experimental projects, and examined the causes that led to their success or failure. The failed projects were compared with the successful projects under similar settings to further document why these projects failed. The lessons learned were detailed.

Sarathi, P.S.; Olsen, D.K. [NIPER/BDM-Oklahoma, Bartlesville, OK (United States)

1995-02-01T23:59:59.000Z

71

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

72

YUCCA MOUNTAIN PROJECT RECOMMENDATION BY THE SECRETARY OF ENERGY REGARDING THE SUITABILITY OF THE YUCCA MOUNTAIN SITE FOR A REPOSITORY UNDER THE NUCLEAR WASTE POLICY ACT OF 1982  

SciTech Connect (OSTI)

For more than half a century, since nuclear science helped us win World War II and ring in the Atomic Age, scientists have known that !he Nation would need a secure, permanent facility in which to dispose of radioactive wastes. Twenty years ago, when Congress adopted the Nuclear Waste Policy Act of 1982 (NWPA or ''the Act''), it recognized the overwhelming consensus in the scientific community that the best option for such a facility would be a deep underground repository. Fifteen years ago, Congress directed the Secretary of Energy to investigate and recommend to the President whether such a repository could be located safely at Yucca Mountain, Nevada. Since then, our country has spent billions of dollars and millions of hours of research endeavoring to answer this question. I have carefully reviewed the product of this study. In my judgment, it constitutes sound science and shows that a safe repository can be sited there. I also believe that compelling national interests counsel in favor of proceeding with this project. Accordingly, consistent with my responsibilities under the NWPA, today I am recommending that Yucca Mountain be developed as the site for an underground repository for spent fuel and other radioactive wastes. The first consideration in my decision was whether the Yucca Mountain site will safeguard the health and safety of the people, in Nevada and across the country, and will be effective in containing at minimum risk the material it is designed to hold. Substantial evidence shows that it will. Yucca Mountain is far and away the most thoroughly researched site of its kind in the world. It is a geologically stable site, in a closed groundwater basin, isolated on thousands of acres of Federal land, and farther from any metropolitan area than the great majority of less secure, temporary nuclear waste storage sites that exist in the country today. This point bears emphasis. We are not confronting a hypothetical problem. We have a staggering amount of radioactive waste in this country--nearly 100,000,000 gallons of high-level nuclear waste and more than 40,000 metric tons of spent nuclear fuel with more created every day. Our choice is not between, on the one hand, a disposal site with costs and risks held to a minimum, and, on the other, a magic disposal system with no costs or risks at all. Instead, the real choice is between a single secure site, deep under the ground at Yucca Mountain, or making do with what we have now or some variant of it--131 aging surface sites, scattered across 39 states. Every one of those sites was built on the assumption that it would be temporary. As time goes by. every one is closer to the limit of its safe life span. And every one is at least a potential security risk--safe for today, but a question mark in decades to come.

NA

2002-03-26T23:59:59.000Z

73

PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing Seed and Fertilizer Placement in Simultaneous, Single-Pass Operations with Air Drills under  

E-Print Network [OSTI]

Hr GRC 3 PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing-seeded into spring wheat stubble at Havre in 2002 is presented in Table 1. The `Morris Gumbo Boot' was included

Maxwell, Bruce D.

74

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

75

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

76

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

77

Detail design of a 10.4-m stretched-membrane dish. Phase 2, Final report  

SciTech Connect (OSTI)

This report describes efforts conducted under Tasks 3 and 4 of the second phase of the project to develop a single-element stretched-membrane dish concept to reduce the cost of a high-performance concentrating solar collector. We completed the detailed design for such a collector suitable to drive a 25-kWe Stirling motor generator. The design includes the collectors, optical element, the drive, and support systems. The aperture of the optical element was sized to provide the required energy to the engine based on test data and analytical models of the concentrator receiver, and engine. The design of the optical element was improved based on experience gained from the design, fabrication, and testing of several prototypes.

Not Available

1994-01-01T23:59:59.000Z

78

Crump Geyser: High Precision Geophysics & Detailed Structural...  

Broader source: Energy.gov (indexed) [DOE]

Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling John Casteel Nevada Geothermal Power Co. Validation of Innovative Exploration...

79

Running GL Detail Report (also known as Department Detail Report) Initial PeopleSoft Screen  

E-Print Network [OSTI]

Running GL Detail Report (also known as Department Detail Report) Initial PeopleSoft Screen Select BSU Processes and Reports #12;Select GL Detail Report The page below will open. At this point you will have two options: #12;Option 1: If you have never run a GL Detail Report you will need to choose "Add

Barrash, Warren

80

Test Series 2. 3 detailed test plan  

SciTech Connect (OSTI)

Test Series 2.3 is chronologically the second of the five sub-series of tests which comprise Test Series 2, the second major Test Series as part of the combustion research phase to be carried out at the Grimethorpe Experimental Pressurised Fluidised Bed Combustion Facility. Test Series 2.3 will consist of 700 data gathering hours which is expected to require some 1035 coal burning hours. The tests will be performed using US supplied coal and dolomite. This will be the first major series of tests on the Facility with other than the UK datum coal and dolomite. The document summarises the background to the facility and the experimental program. Described are modifications which have been made to the facility following Test Series 2.1 and a series of Screening Tests. Detailed test objectives are specified as are the test conditions for the experiments which comprise the test series. The test results will provide information on the effects of the bed temperature, excess air level, Ca/S ratio, number of coal feed lines, and combustion efficiency and sulphur retention. A significant aspect of the test series will be part load tests which will investigate the performance of the facility under conditions of turn down which simulate load following concepts specified for two combined cycle concepts, i.e., their CFCC combined cycle and a turbo charged combined cycle. The material test plan is also presented. The principal feature of the materials programme is the planned exposure of a set of static turbine blade specimens in a cascade test loop to the high temperature, high pressure flue gas. A schedule for the programme is presented as are contingency plans.

Not Available

1983-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

82

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

83

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

84

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

85

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

86

Energy Savings Performance Contract Project Assistance for Agencies...  

Broader source: Energy.gov (indexed) [DOE]

Savings Performance Contract Project Assistance for Agencies Energy Savings Performance Contract Project Assistance for Agencies Fact sheet details an overview of Federal Energy...

87

Save Energy Now - South Carolina Project Fact Sheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

- South Carolina Project Fact Sheet Save Energy Now - South Carolina Project Fact Sheet This fact sheet contains details regarding a Save Energy Now industrial energy efficiency...

88

Reducing Industrial Energy Intensity in the Southeast Project...  

Broader source: Energy.gov (indexed) [DOE]

Industrial Energy Intensity in the Southeast Project Fact Sheet Reducing Industrial Energy Intensity in the Southeast Project Fact Sheet This fact sheet contains details regarding...

89

PI & Project Team PAF Changes  

E-Print Network [OSTI]

Proposal Management PI & Project Team PAF Changes Step-By-Step Procedures Last updated: 4/1/2013 1 of 10 http://eresearch.umich.edu PAF Changes This procedure details how the PI & Project Team can: Make Management PI & Project Team PAF Changes Step-By-Step Procedure Last updated: 4/1/2013 3 of 10 http

Shyy, Wei

90

Simulating plant motion with levels of detail  

E-Print Network [OSTI]

SIMULATING PLANT MOTION WITH LEVELS OF DETAIL A Senior Honors Thesis by REBECCA LYNN FLANNERY Submitted to the Office of Honors Programs k. Academic Scholarships Texas AkM University in partial fulfillment of the requirements... of the UNIVERSITY UNDERGRADUATE RESEARCH FELLOWS April 2003 Group: Engineering & Physics I SIMULATING PLANT MOTION WITH LEVELS OF DETAIL A Senior Honors Thesis by REBECCA LYNN FLANNERY Submitted to the Office of Honors Programs & Academic Scholarships...

Flannery, Rebecca Lynn

2013-02-22T23:59:59.000Z

91

PV Manufacturing R&D Project Status and Accomplishments Under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability'  

SciTech Connect (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. 'In-line Diagnostics and Intelligent Processing', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. 'Yield, Durability and Reliability', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.73/Wp, and the capacity increased 18.5-fold (25% annualized) to 251 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J. A.

2006-01-01T23:59:59.000Z

92

MHK Projects/US Navy Wave Energy Technology WET Program at Marine...  

Open Energy Info (EERE)

Project StateProvince Hawaii Project Country United States Project Resource Click here Wave Coordinates 21.4164, -157.784 Project Phase Phase 3 Project Details The same PB-40...

93

CURRICULUM VITAE OF MATTHIAS ZAHN PERSONAL DETAILS  

E-Print Network [OSTI]

, GKSS Research Centre Geesthacht Research Associate, in the "SFB-512"-project 2005 - 2009 Meteorological Institute for Coastal Research, GKSS Research Centre Geesthacht Research Associate, in the "HIPOCAS with GKSS Research Centre Geesthacht) Dissertation (excellent) Disputation (very good) "A long

Zahn, Matthias

94

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

95

Detailed Financial Procedures Page 1 of 3  

E-Print Network [OSTI]

Detailed Financial Procedures Page 1 of 3 Inventories and Disposals Background In accordance with Standing Financial Regulation, Heads of Departments are responsible for maintaining inventories for all disposals thereof. (Ref 8.03 & 8.06) Inventory Spreadsheet The following information should be recorded

Levi, Ran

96

Contact Details Journeying Beyond Breast Cancer  

E-Print Network [OSTI]

Home About Contact Details Facebook Search Journeying Beyond Breast Cancer making sense of the cancer experience Feeds: Posts Comments Cancer-fighting fountain pen May 20, 2009 by JBBC A research team be used both as a research tool in the development of next-generation cancer treatments

Espinosa, Horacio D.

97

Contact details: School of Architecture, BCU  

E-Print Network [OSTI]

With 90% of the UK population living in urban areas, improving urban sustainability has become a pressing Economic Fabric This work package investigated opportunities and barriers to achieving sustainable is to be sustainable in the widest sense. Contact details: Centre for Urban and Regional Studies, U0B Dr. Austin Barber

Birmingham, University of

98

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

99

Fort Drum integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

100

Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail  

SciTech Connect (OSTI)

The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

1993-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Project AIRSTREAM: Trace gas final report  

SciTech Connect (OSTI)

The results of 10 years of sampling for trace gases in the upper troposphere and lower stratosphere are presented. These samples were collected under the auspices of the Atomic Energy Commission (AEC), the Energy Research and Development Administration (ERDA) and the Department of Energy (DOE). Almost 1000 whole air samples were collected during the years 1973 to 1983 under Project AIRSTREAM. Project AIRSTREAM was part of the Environmental Measurements Laboratory`s (EML, at that time called the Health and Safety Laboratory/HASL) research effort to investigate the impact of the injection of radionuclides and stable compounds into the stratosphere. One or more of the following compounds were analyzed: CCl{sub 3}F, CCl{sub 2}F{sub 2}, CCl{sub 4}, N{sub 2}O, SF{sub 6}, CO{sub 2}, CH{sub 4}, CH{sub 3}CCl{sub 3}, and COS. Details of the Project`s quality assurance program are discussed. Also included in the report are two-dimensional plots of the concentration of CCl{sub 3}F and a complete tabulation of the data.

Leifer, R.

1992-12-01T23:59:59.000Z

102

CURRICULUM VITAE OF MATTHIAS ZAHN PERSONAL DETAILS  

E-Print Network [OSTI]

- 2010 Institute for Coastal Research, GKSS Research Centre Geesthacht Research Associate, in the "SFB"-project funded by the Helmholtz Association 2005 Institute for Coastal Research, GKSS Research Centre Geesthacht of Geo-sciences, University of Hamburg (developed in cooperation with GKSS Research Centre Geesthacht

Zahn, Matthias

103

Detailed mining study phase 3: Saba Yoi lignite deposit. Export trade information  

SciTech Connect (OSTI)

The study, conducted by John T. Boyd Company, was funded by the U.S. Trade and Development Agency on behalf of the Electricity Generating Authority of Thailand. The report presents Phase 3 of the feasibility study conducted for the development of the Saba Yoi Coal Mine. The study focuses on technical issues related to the development of the project including geological data and detailed mine development and scheduling. The report is divided into the following sections: (1) General Statement; (2) Summarized Findings; (3) Background; (4) Geology and Resources; (5) Geotechnical/Hydrogeological; (6) Detailed Mine Development; (7) Detailed Mine Production Scheduling; (8) Detailed Mine Analysis; (9) Mine Development and Facilities; (10) Mine Labor and Wages; and (11) Project Economics.

NONE

1994-07-01T23:59:59.000Z

104

U. S. Department of Energy project book  

SciTech Connect (OSTI)

This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)

Not Available

1980-01-01T23:59:59.000Z

105

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements V1 Released September 2013 Targeted Commercial Single Measure or Non-Interactive Retrofits Release Date Dec 2013 Multifamily Release Q1 2014 Quality Assurance Protocol Currently in BETA...Environmental Defense Funds Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

106

Environmental of Forestry Projects  

E-Print Network [OSTI]

Environmental Impact Assessment of Forestry Projects #12;EnvironmentalImpactAssessment 2 Flow chart Details of the Environmental Statement publicised for comment FC considers ES and any comments received FC the issues of concern that need to be covered in the Environmental Statement (ES). The Environmental

107

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

108

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

109

Details of U.S. Climate Zones:  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30Natural Gas Glossary529 633 622 56623 4623 42YearDelawareDetails of U.S.

110

CBECS 1992 - Building Characteristics, Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS98,,,1999,0,0,1e+15,1469,6,01179,"WAT","HY"Tables andA 6 J (MillionCubic35775 84 8711757Detailed

111

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look at RNA

112

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look at

113

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look

114

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed

115

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

116

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

117

Silver Peak Innovative Exploration Project  

Broader source: Energy.gov [DOE]

DOE Geothermal Peer Review 2010 - Presentation. Project objectives: Reduce the high level of risk during the early stages of geothermal project development by conducting a multi-faceted and innovative exploration and drilling program at Silver Peak. Determine the combination of techniques that are most useful and cost-effective in identifying the geothermal resource through a detailed, post-project evaluation of the exploration and drilling program.

118

CLEAR LAKE BASIN 2000 PROJECT  

SciTech Connect (OSTI)

The following is a final report for the Clear Lake Basin 2000 project. All of the major project construction work was complete and this phase generally included final details and testing. Most of the work was electrical. Erosion control activities were underway to prepare for the rainy season. System testing including pump stations, electrical and computer control systems was conducted. Most of the project focus from November onward was completing punch list items.

LAKE COUNTY SANITATION DISTRICT

2003-03-31T23:59:59.000Z

119

Significant Project Flow Chart (for Board Approved Capital Construction Projects 2 million and above)  

E-Print Network [OSTI]

of the project. Construction documents include final detailed drawings, specifications, material lists and all the project will be constructed, schedules work with his subcontractors, and orders materials. BuildingSignificant Project Flow Chart (for Board Approved Capital Construction Projects 2 million

120

MHK Projects/Wave Powered Pumping of Seawater for On Shore Use...  

Open Energy Info (EERE)

s Cove Burin Peninsula, Newfoundland Project Country Canada Project Resource Click here Wave Coordinates 46.53, -55.4 Project Phase Phase 3 Project Details Although SARAHS Pump...

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

122

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

123

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

124

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

125

Detailed Energy Data Collection for Miscellaneous and Electronic Loads in a  

E-Print Network [OSTI]

Background Buildings account for 40% of the total primary energy consumption in the U.S., with 22% consumed% of the primary energy used in U.S. buildings, and this share is projected to increase for the foreseeable futureLBNL-6192E Detailed Energy Data Collection for Miscellaneous and Electronic Loads in a Commercial

126

Description of Axial Detail for ROK Fuel  

SciTech Connect (OSTI)

For the purpose of NDA simulations of the ROK fuel assemblies, we have developed an axial burnup distribution to represent the pins themselves based on gamma scans of rods in the G23 assembly. For the purpose of modeling the G23 assembly (both at ORNL and LANL), the pin-by-pin burnup map as simulated by ROK is being assumed to represent the radial burnup distribution. However, both DA and NDA results indicate that this simulated estimate is not 100% correct. In particular, the burnup obtained from the axial gamma scan of 7 pins does not represent exactly the same 'average' pin burnup as the ROK simulation. Correction for this discrepancy is a goal of the well-characterized assembly task but will take time. For now, I have come up with a correlation for 26 axial points of the burnup as obtained by gamma scans of 7 different rods (C13, G01, G02, J11, K10, L02, and M04, neglecting K02 at this time) to the average burnup given by the simulation for each of the rods individually. The resulting fraction in each axial zone is then averaged for the 7 different rods so that it can represent every fuel pin in the assembly. The burnup in each of the 26 axial zones of rods in all ROK assemblies will then be directly adjusted using this fraction, which is given in Table 1. Note that the gamma scan data given by ROK for assembly G23 included a length of {approx}3686 mm, so the first 12 mm and the last 14 mm were ignored to give an actual rod length of {approx}366 cm. To represent assembly F02 in which no pin-by-pin burnup distribution is given by ROK, we must model it using infinitely-reflected geometry but can look at the effects of measuring in different axial zones by using intermediate burnup files (i.e. smaller burnups than 28 GWd/MTU) and determining which axial zone(s) each burnup represents. Details for assembly F02 are then given in Tables 2 and 3, which is given in Table 1 and has 44 total axial zones to represent the top meter in explicit detail in addition to the other 26 zones. Note that the MCNP files for F02 were created using the Monte Carlo burnup linkage code Monteburns, which saves MCNP input files with detailed compositions as a function of burnup. The 'intermediate burnup files' produced for F02 include a cooling time of 27 years. The axial location of 5 spacers was also included in the ROK F02 assembly in which each spacer contained a length of 3.81 cm. Note that due to the nature of Monteburns, which was run in a special fashion for this problem, the step number increments after the 27 year decay, so the second column of Table 2 refers to the step number that should be used in the Monteburns files.

Trellue, Holly R [Los Alamos National Laboratory; Galloway, Jack D [Los Alamos National Laboratory

2012-04-20T23:59:59.000Z

127

Project AIRSTREAM: Trace gas final report  

SciTech Connect (OSTI)

The results of 10 years of sampling for trace gases in the upper troposphere and lower stratosphere are presented. These samples were collected under the auspices of the Atomic Energy Commission (AEC), the Energy Research and Development Administration (ERDA) and the Department of Energy (DOE). Almost 1000 whole air samples were collected during the years 1973 to 1983 under Project AIRSTREAM. Project AIRSTREAM was part of the Environmental Measurements Laboratory's (EML, at that time called the Health and Safety Laboratory/HASL) research effort to investigate the impact of the injection of radionuclides and stable compounds into the stratosphere. One or more of the following compounds were analyzed: CCl[sub 3]F, CCl[sub 2]F[sub 2], CCl[sub 4], N[sub 2]O, SF[sub 6], CO[sub 2], CH[sub 4], CH[sub 3]CCl[sub 3], and COS. Details of the Project's quality assurance program are discussed. Also included in the report are two-dimensional plots of the concentration of CCl[sub 3]F and a complete tabulation of the data.

Leifer, R.

1992-12-01T23:59:59.000Z

128

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.  

SciTech Connect (OSTI)

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

Bronson, James P.; Duke, Bill; Loffink, Ken

2008-12-30T23:59:59.000Z

129

Detailed Assessment of Particulate Characteristics from Low-Temperatur...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion Engines Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion...

130

Atomic detail brownian dynamics simulations of concentrated protein...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

detail brownian dynamics simulations of concentrated protein solutions with a mean field treatment of hydrodynamic Atomic detail brownian dynamics simulations of concentrated...

131

Improving Combustion Software to Solve Detailed Chemical Kinetics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Combustion Software to Solve Detailed Chemical Kinetics for HECC Improving Combustion Software to Solve Detailed Chemical Kinetics for HECC 2012 DOE Hydrogen and Fuel Cells Program...

132

Residential Windows and Window Coverings: A Detailed View of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior Residential Windows and Window Coverings: A Detailed View of the Installed Base...

133

FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2  

SciTech Connect (OSTI)

Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

Not Available

1991-02-01T23:59:59.000Z

134

Interstate Clean Transportation Corridor Project Under Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared LandResponses to EngineeredA GENERAL2Radiative Transfer Model and

135

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

136

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

137

Human Factors Considerations in New Nuclear Power Plants: Detailed Analysis.  

SciTech Connect (OSTI)

This Nuclear Regulatory Commission (NRC) sponsored study has identified human-performance issues in new and advanced nuclear power plants. To identify the issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were organized into seven high-level HFE topic areas: Role of Personnel and Automation, Staffing and Training, Normal Operations Management, Disturbance and Emergency Management, Maintenance and Change Management, Plant Design and Construction, and HFE Methods and Tools. The issues where then prioritized into four categories using a 'Phenomena Identification and Ranking Table' methodology based on evaluations provided by 14 independent subject matter experts. The subject matter experts were knowledgeable in a variety of disciplines. Vendors, utilities, research organizations and regulators all participated. Twenty issues were categorized into the top priority category. This Brookhaven National Laboratory (BNL) technical report provides the detailed methodology, issue analysis, and results. A summary of the results of this study can be found in NUREG/CR-6947. The research performed for this project has identified a large number of human-performance issues for new control stations and new nuclear power plant designs. The information gathered in this project can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas through regulatory research. Addressing human-performance issues will provide the technical basis from which regulatory review guidance can be developed to meet these challenges. The availability of this review guidance will help set clear expectations for how the NRC staff will evaluate new designs, reduce regulatory uncertainty, and provide a well-defined path to new nuclear power plant licensing.

OHara,J.; Higgins, J.; Brown, W.; Fink, R.

2008-02-14T23:59:59.000Z

138

Tucson Solar Village: Project management  

SciTech Connect (OSTI)

The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

Not Available

1991-11-01T23:59:59.000Z

139

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

140

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

142

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

143

Fracture mechanics analysis on the resistance of welded details under variable amplitude long life loading  

E-Print Network [OSTI]

. Total Fatigue Cycles vs. Contributed Fatigue Cycles (ao = 0. 03 in. ), . . . . . . . . 49 . . . . . 50 Figure 25. 26. 27. 28. 29. Total Fatigue Cycles vs. Contributed Fatigue Cycles (ao = 0. 05 in. ). . . . Effective Stress Range Src vs... for Category C (Rayleigh Distribution) . . . General Stress Spectrum for Category C (Truncated Distribution) . . . . Q - N /Nt Relationship for Cover Plate (Rayleigh Distribution) . . . . . . . Q - N /Nt Relationship for Cover Plate (Truncated Distribution...

Zhou, Minjian

1993-01-01T23:59:59.000Z

144

Technology detail in a multi-sector CGE model : transport under climate policy  

E-Print Network [OSTI]

A set of three analytical models is used to study the imbedding of specific transport technologies within a multi-sector, multi-region evaluation of constraints on greenhouse emissions. Key parameters of a computable general ...

Schafer, Andreas.

145

Uniform Methods Project for Determining Energy Efficiency Program...  

Energy Savers [EERE]

for Determining Energy Efficiency Program Savings Uniform Methods Project for Determining Energy Efficiency Program Savings Under the Uniform Methods Project, DOE is developing a...

146

Reducing Industrial Energy Intensity in the Southeast Project Fact Sheet  

Broader source: Energy.gov [DOE]

This fact sheet contains details regarding a Save Energy Now industrial energy efficiency project that the U.S. Department of Energy funded in Mississippi.

147

Supporting Texas Manufacturing to "Save Energy Now" Project Fact Sheet  

Broader source: Energy.gov [DOE]

This fact sheet contains details regarding a Save Energy Now industrial energy efficiency project that the U.S. Department of Energy funded in Texas.

148

Expanding the WisconSEN Program Project Fact Sheet  

Broader source: Energy.gov [DOE]

This fact sheet contains details regarding a Save Energy Now industrial energy efficiency project that the U.S. Department of Energy funded in Wisconsin.

149

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two Studies Reveal Details of Lithium-Battery Function Two Studies Reveal Details of Lithium-Battery Function Print Wednesday, 27 February 2013 00:00 Our way of life is deeply...

150

Alternate States of Proteins Revealed by Detailed Energy Landscape Mapping  

E-Print Network [OSTI]

Alternate States of Proteins Revealed by Detailed Energy Landscape Mapping Michael D. Tyka1 Keywords: Rosetta; alternative conformations; protein mobility; structure prediction; validation What through analysis of detailed protein energy landscapes generated by large-scale, native- enhanced sampling

Baker, David

151

Integrated Project Team Guide for Formation and Implementation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B.

2012-02-03T23:59:59.000Z

152

Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2003  

SciTech Connect (OSTI)

This report presents results obtained from detailed hydrologic characterization of the unconfined aquifer system conducted at the Hanford Site.

Spane, Frank A.; Newcomer, Darrell R.

2004-09-13T23:59:59.000Z

153

How to use the Weblinks GL Transaction Detail Rollup Template  

E-Print Network [OSTI]

How to use the Weblinks GL Transaction Detail Rollup Template Issue Details The following instructions will show you how to utilize Excel to summarize the Weblinks GL Transaction Detail report so Instructions: 1. Create a Weblinks report 2. Export to Excel 3. Open the Excel 4. Copy and paste to Weblinks GL

Yamamoto, Keith

154

UoS Motor Accident Report Form COMPANY DETAILS  

E-Print Network [OSTI]

UNIV01FL02 UoS Motor Accident Report Form COMPANY DETAILS INSURED: University of Sussex ADDRESS: LOCATION: DESCRIPTION OF HOW ACCIDENT HAPPENED: PLEASE DRAW A SKETCH OF THE ACCIDENT: #12;DRIVER DETAILS: PREVIOUS ACCIDENTS: ADDRESS: VEHICLE DETAILS DATE VEHICLE PURCHASED: MAKE/MODEL: REGISTRATION: MILEAGE

Sussex, University of

155

Current SunShot Incubator Projects  

Broader source: Energy.gov [DOE]

Projects funded under the SunShot Incubator Program allow start-up businesses to yield breakthrough technologies and game-changing insights. The following projects are in progress. SunShot Incubator 7 and 8.

156

Plating under reduced pressure  

SciTech Connect (OSTI)

Plating under reduced pressure was evaluated for both electroless nickel and electrodeposited copper systems. The objective was to reduce pitting of these coatings thereby further enhancing their usage for diamond turning applications. Cursory experiments with electroless nickel showed reduced porosity when deposition was done at around 500 torr. Detailed experiments with electrodeposited copper at around 100 torr provided similar results. Scanning tunneling microscopy was effectively used to show the improvement in the copper deposits plated under reduced pressure. Benefits included reduced surface roughness and finer and denser grain structure.

Dini, J.W.; Beat, T.G.; Cowden, W.C. (Lawrence Livermore National Lab., CA (United States)); Ryan, L.E.; Hewitt, W.B. (TRW, Inc., Redondo Beach, CA (United States))

1992-06-01T23:59:59.000Z

157

Decentralized customerlevel under frequency load shedding in...  

Open Energy Info (EERE)

project focuses on a smart demand side management of household consumers. Modern communication technology enables the management of large groups of distributed loads under a...

158

Enabling Detailed Energy Analyses via the Technology Performance Exchange: Preprint  

SciTech Connect (OSTI)

One of the key tenets to increasing adoption of energy efficiency solutions in the built environment is improving confidence in energy performance. Current industry practices make extensive use of predictive modeling, often via the use of sophisticated hourly or sub-hourly energy simulation programs, to account for site-specific parameters (e.g., climate zone, hours of operation, and space type) and arrive at a performance estimate. While such methods are highly precise, they invariably provide less than ideal accuracy due to a lack of high-quality, foundational energy performance input data. The Technology Performance Exchange was constructed to allow the transparent sharing of foundational, product-specific energy performance data, and leverages significant, external engineering efforts and a modular architecture to efficiently identify and codify the minimum information necessary to accurately predict product energy performance. This strongly-typed database resource represents a novel solution to a difficult and established problem. One of the most exciting benefits is the way in which the Technology Performance Exchange's application programming interface has been leveraged to integrate contributed foundational data into the Building Component Library. Via a series of scripts, data is automatically translated and parsed into the Building Component Library in a format that is immediately usable to the energy modeling community. This paper (1) presents a high-level overview of the project drivers and the structure of the Technology Performance Exchange; (2) offers a detailed examination of how technologies are incorporated and translated into powerful energy modeling code snippets; and (3) examines several benefits of this robust workflow.

Studer, D.; Fleming, K.; Lee, E.; Livingood, W.

2014-08-01T23:59:59.000Z

159

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

160

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

PARS II Process Document Project Phasing (Multiple CD-2 from Single CD-1)  

Broader source: Energy.gov [DOE]

This document details the process by which projects that adopted Phasing approach (different phases of the same larger project are treated as separate sub-projects, resulting in multiple CD-2...

162

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell...

163

azobenzene detailed mechanism: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Post Graduate Activities Detail & History Materials Science Websites Summary: Raytheon Systems Engineer Tucson AZ MENG Rockwell Collins Mechanical Engineer Sterling VA MENG...

164

A Stochastic Reactor Based Virtual Engine Model Employing Detailed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A Stochastic Reactor Based Virtual Engine Model Employing Detailed Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment A Stochastic Reactor Based...

165

Applying engineering and fleet detail to represent passenger vehicle transport in  

E-Print Network [OSTI]

--essential knowledge for the international dialogue toward a global response to climate change. To this end Change Postal Address: Massachusetts Institute of Technology 77 Massachusetts Avenue, E19-411 Cambridge within the underlying physical system. This work develops a method for projecting global demand

166

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

167

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

168

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

169

Senior Systems Analyst-PeopleSoft Campus Solutions Posting Details  

E-Print Network [OSTI]

and emerging technologies. This position may lead and coordinate the design, development, and implementation assurance and testing activities required to maintain business solutions. This position reportsSenior Systems Analyst-PeopleSoft Campus Solutions Posting Details Posting Details Position Title

Liblit, Ben

170

Adult Football Helmet Detailed Ratings Riddell Revolution Speed  

E-Print Network [OSTI]

Adult Football Helmet Detailed Ratings May 2011 Riddell Revolution Speed Helmet ID SPEED1 SPEED2: A total of 10 adult football helmet models were evaluated using the STAR evaluation system for May 2011.397 0.350 0.322 Overall STAR 0.356 Very Good: Adult Football Helmet Detailed Ratings May 2011 #12

Lu, Chang

171

Detailed chemical kinetic oxidation mechanism for a biodiesel Olivier Herbineta  

E-Print Network [OSTI]

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate Olivier Herbineta , William of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO2 production from

Paris-Sud XI, Université de

172

Detailed investigation of a pulverized fuel swirl flame in CO{sub 2}/O{sub 2} atmosphere  

SciTech Connect (OSTI)

A novel approach to oxycoal flame stabilization has been developed at the Institute of Heat and Mass Transfer at RWTH Aachen University [D. Toporov, M. Foerster, R. Kneer, in: Third Int. Conf. on Clean Coal Technologies for Our Future, Cagliari, Sardinia, Italy, 15-17 May 2007]. The swirl burner design and its operating conditions have been adjusted in order to enforce CO formation thus stabilizing the flame and obtaining a full burnout at levels of O{sub 2} content in the O{sub 2}/CO{sub 2} mixture similar to those in air. The paper presents results of detailed numerical and experimental investigations of a stable oxy-fired pulverized coal swirl flame (type-2) obtained with a 21 vol% O{sub 2} concentration. The combustion tests were performed in a vertical pilot-scale furnace (100 kW{sub th}) in the framework of the OXYCOAL-AC research project aiming to develop a membrane-based oxyfuel process. The experimental results concerning gas velocities, gas and particle temperatures, and gas compositions are presented and discussed, focusing on the underlying mechanisms as well as on the aerodynamics of the oxycoal flame. A comparison between measurements and simulations has shown the validity of the numerical method used. The reported data set can be used for validation of numerical models developed for prediction of oxyfuel combustion. (author)

Toporov, D.; Bocian, P.; Heil, P.; Kellermann, A.; Stadler, H.; Tschunko, S.; Foerster, M.; Kneer, R. [Institute of Heat and Mass Transfer, RWTH Aachen University, Eilfschornsteinstrasse 18, D-52056 Aachen (Germany)

2008-12-15T23:59:59.000Z

173

Development and validation of detailed controls models of the Nelson River Bipole 1 HVDC system  

SciTech Connect (OSTI)

With the Nelson River Bipole 1 mercury arc valve group replacement project and planning for the expansion of the Nelson River HVDC system with a third bipole underway, it was decided to pursue a program to develop and validate detailed models of the existing HVDC transmission facilities and their associated ac systems for use in system studies. The first phase of the program concentrated on the development of detailed controls models associated with the Bipole 1 transmission facility. Based on previous experience at Manitoba Hydro with the Electromagnetic Transient DC simulation program (EMTDC), it was decided that model development and validation would use this program. This paper presents the reasons behind the development of detailed models, the methods used in developing models related to Bipole 1, results of validation tests, difficulties encountered during the process, and the overall benefits resulting from the project. An example of applying the models to investigate a low frequency oscillation which has occurred on the dc system in the past is also presented.

Kuffel, P.; Kent, K.L.; Mazur, G.B.; Weekes, M.A. (Manitoba Hydro, Winnipeg (Canada))

1993-01-01T23:59:59.000Z

174

Ashtabula Environmental Management Project Main Extrusion Plant Demolition Project. Demolition of the Ashtabula Environmental Management Project's Main Extrusion Plant  

SciTech Connect (OSTI)

Significant progress was made this year toward closure of the Department of Energy's Ashtabula Environmental Management Project (AEMP) with the demolition of the 9-building Main Extrusion Plant Complex. The 44,000 square foot building complex formerly housed uranium extrusion facilities and equipment. At the start of the project in October of 2001, the buildings still contained a RCRA Part B storage area, operating mixed waste treatment facilities, active waste shredding and compacting process areas, and a state EPA permitted HEPA ventilation system. This paper presents a discussion of the multidisciplinary effort to bring the building to a safe shutdown condition in just six months, including relocation of existing process areas, utility isolation, and preliminary decontamination. Also discussed is the demolition strategy in which portions of the facility remained active while demolition was proceeding in other areas. Other details of the technical approach to the demolition are also discussed, including innovative techniques for demolition, galbestos removal, contamination control, and waste minimization. These techniques contributed to the early completion of demolition in July of 2002, fully two months ahead of schedule and $1.5 million under budget.

Colborn, Kurt; Johnson, Kathryn K.

2003-02-27T23:59:59.000Z

175

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

176

Project Management through States Benjamin Menhorn  

E-Print Network [OSTI]

not only in cost and time overruns but also in a high cancellation rate of such projects. For hardware]. Costs and duration of a project are adjusted by a questionnaire which determines its complexity in order to get more and more complex projects under control and keep them within certain cost and duration

Ulm, Universität

177

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

178

Design aspects of upgradation from 6 pulse to 12 pulse operation of NHVDC project  

SciTech Connect (OSTI)

In India, the first HVDC project was a back to back link between the northern grid and the Western grid at Vindhyachal. This project was commissioned by an external agency. By 1982 it was abundantly clear that HVDC would find a significant place in Indian power system. Government of India in its wisdom approved a proposal for an experimental HVDC line project to give Indian planners, manufacturers and utilities an opportunity to absorb the technology. The stage-1 of this National HVDC (NHVDC) project was successfully commissioned in October 1990, and has since been operating quite satisfactorily. In continuation of that effort, Government of India has since approved stage-2 of NHVDC project, which is under execution, at present. In stage-1, the challenge was to do the system studies, manufacture main circuit equipment and develop a controller. In stage-2 the focus will be on modernization and project engineering. The major change in stage-2 shall be the modernization of the controls. Upgradation details and the care being taken to have minimum disturbance to the existing setup, it discussed in this paper. The operational requirements, system solutions and control system aspects which have been considered and are being implemented for this project are also covered.

Singhal, A.; Gera, R.; Tripathy, A.K.; Adhikari, T.; Hanif, M. [Bharat Heavy Electricals Ltd., New Delhi (India). Transmission Projects Dept.; Prakash, K.S.; Das, R.L. [Bharat Heavy Electricals Ltd., Bangalore (India). Electronics Div.

1995-12-31T23:59:59.000Z

179

Detailed Description of Key NIF Milestones for NNSA Description  

E-Print Network [OSTI]

1 Detailed Description of Key NIF Milestones for NNSA Short Description NIC EP Rev 4.0 Approved = Milestone Reporting Tool, which NNSA uses to support quarterly status reporting of NIC Level 1-2 milestones

180

CMPE 185 Spring 1998 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Spring 1998 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF of the quarter, and 10% on in­class work, Karplus & Larrabee Info 1 #12; 2 Syllabus CMPE 185 Spring 1998

Karplus, Kevin

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CMPE 185 Fall 1999 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 1999 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2 Syllabus CMPE 185 Fall 1999 4 Special guest lecturers I may arrange to have some guest lectures

Karplus, Kevin

182

CMPE 185 Winter 1999 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Winter 1999 Syllabus 1 Syllabus 1 Administrative details Location and time Porter 144, MWF). Everything must be turned in by the last day of class, Friday March 12. Karplus Info 1 #12; 2 Syllabus CMPE

Karplus, Kevin

183

CMPE 185 Fall 2000 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 2000 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2, and need to do the grading mostly on Dec 2. Karplus Info 1 #12; 2 Syllabus CMPE 185 Fall 2000 4 Special

Karplus, Kevin

184

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

185

MOT Applied Research Projects Where science, technology, and business meet  

E-Print Network [OSTI]

MOT Applied Research Projects Where science, technology, and business meet Project Details) Compensation: No charge for selected company projects Your Commitment: Involvement ranges from a few check Science Engineering Arts and Sciences Life Sciences Average age: 33 Typical work experience: 5 - 8 years

186

Details of Forestry Commission and DARDNI Plant Health Contacts for UK Points of Entry UK Principle Ports Contacts Contact Details  

E-Print Network [OSTI]

Ports Contacts Contact Details Felixstowe Richard Fergusson Pat Mitchell Philip Evans Roland Fry Fax Other GB Ports John Hunter Joanne McAuley Fax 0131-314-6148 Tel : 0131-314-6182 or Tel : 0131

187

Document management guidelines for distributed project networks  

E-Print Network [OSTI]

This paper provides the project engineer with guidelines or a checklist on tasks that must be considered, defined and documented before the project can successfully implement a document management system in geographically distributed project environment. Topics ranging from configuration management, approval process, document types, user administration and document naming are covered. The underlying cases of the paper are that of CERN (European Laboratory for Particle Physics) and its latest accelerator project, together with the Nordisk Industrifond -funded Connecting Distributed Competencies (NI#: 98082) project, with a focus on distributed shipbuilding processes. Keywords: distributed project management, product data management, networking, document management, virtual workspaces

Hameri, A P; Himyr, Nils-Joar

1999-01-01T23:59:59.000Z

188

Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1  

SciTech Connect (OSTI)

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

Not Available

1993-08-11T23:59:59.000Z

189

Physics from Angular Projection of Rectangular Grids  

E-Print Network [OSTI]

In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple, yet interesting problem, has both a scholarly value and applications for data extraction techniques to study the physics of various systems. Our work can interest undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential ap...

Singh, Ashmeet

2015-01-01T23:59:59.000Z

190

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

191

Hanford Environmental Dose Reconstruction Project  

SciTech Connect (OSTI)

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates.

Finch, S.M.; McMakin, A.H. (comps.)

1992-06-01T23:59:59.000Z

192

The LOFAR Transients Key Project  

E-Print Network [OSTI]

LOFAR, the Low Frequency Array, is a new radio telescope under construction in the Netherlands, designed to operate between 30 and 240 MHz. The Transients Key Project is one of the four Key Science Projects which comprise the core LOFAR science case. The remit of the Transients Key Project is to study variable and transient radio sources detected by LOFAR, on timescales from milliseconds to years. This will be achieved via both regular snapshot monitoring of historical and newly-discovered radio variables and, most radically, the development of a `Radio Sky Monitor' which will survey a large fraction of the northern sky on a daily basis.

Rob Fender; Robert Braun; Ben Stappers; Ralph Wijers; Michael Wise; Thijs Coenen; Heino Falcke; Jean-Mathias Griessmeier; Michiel van Haarlem; Peter Jonker; Casey Law; Sera Markoff; Joseph Masters; James Miller-Jones; Rachel Osten; Bart Scheers; Hanno Spreeuw; John Swinbank; Corina Vogt; Rudy Wijnands; Philippe Zarka

2006-11-09T23:59:59.000Z

193

Tile-based Level of Detail for the Parallel Age  

SciTech Connect (OSTI)

Today's PCs incorporate multiple CPUs and GPUs and are easily arranged in clusters for high-performance, interactive graphics. We present an approach based on hierarchical, screen-space tiles to parallelizing rendering with level of detail. Adapt tiles, render tiles, and machine tiles are associated with CPUs, GPUs, and PCs, respectively, to efficiently parallelize the workload with good resource utilization. Adaptive tile sizes provide load balancing while our level of detail system allows total and independent management of the load on CPUs and GPUs. We demonstrate our approach on parallel configurations consisting of both single PCs and a cluster of PCs.

Niski, K; Cohen, J D

2007-08-15T23:59:59.000Z

194

PXIE: Project X Injector Experiment  

SciTech Connect (OSTI)

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are planning a program of research and development aimed at integrated systems testing of critical components comprising the front end of the Project X. This program is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. Integrated systems testing, known as the Project X Injector Experiment (PXIE), will be accomplished with a new test facility under construction at Fermilab and will be completed over the period FY12-16. PXIE will include an H{sup -} ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

Ostroumov, P.N.; /Argonne; Holmes, S.D.; Kephart, R.D.; Kerby, J.S.; Lebedev, V.A.; Mishra, C.S.; Nagaitsev, S.; Shemyakin, A.V.; Solyak, N.; Stanek, R.P.; /Fermilab; Li, D.; /LBL, Berkeley

2012-05-01T23:59:59.000Z

195

Detailed design report for an operational phase panel-closure system  

SciTech Connect (OSTI)

Under contract to Westinghouse Electric Corporation (Westinghouse), Waste Isolation Division (WID), IT Corporation has prepared a detailed design of a panel-closure system for the Waste Isolation Pilot Plant (WIPP). Preparation of this detailed design of an operational-phase closure system is required to support a Resource Conservation and Recovery Act (RCRA) Part B permit application and a non-migration variance petition. This report describes the detailed design for a panel-closure system specific to the WIPP site. The recommended panel-closure system will adequately isolate the waste-emplacement panels for at least 35 years. This report provides detailed design and material engineering specifications for the construction, emplacement, and interface-grouting associated with a panel-closure system at the WIPP repository, which would ensure that an effective panel-closure system is in place for at least 35 years. The panel-closure system provides assurance that the limit for the migration of volatile organic compounds (VOC) will be met at the point of compliance, the WIPP site boundary. This assurance is obtained through the inherent flexibility of the panel-closure system.

NONE

1996-01-11T23:59:59.000Z

196

Unit 1: Project Planning and Scheduling To provide a brief introduction to project planning  

E-Print Network [OSTI]

is not the project manager it is essential that he or she has a good understanding of project management task #12 be considered under the general title Critical Path Scheduling (CPS) ¥ CPS is a management control tool machine #12;5 Activity List ¥ The initial step in applying CPS is to break the project down into its

Finkelstein, Anthony

197

Healy Clean Coal Project  

SciTech Connect (OSTI)

The Healy Clean Coal Project, selected by the U.S. Department of Energy under Round 111 of the Clean Coal Technology Program, has been constructed and is currently in the Phase 111 Demonstration Testing. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the U.S. Department of Energy. Construction was 100% completed in mid-November of 1997, with coal firing trials starting in early 1998. Demonstration testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of nitrogen oxides (NOx), sulfur dioxide (S02), and particulate from this 50-megawatt plant are expected to be significantly lower than current standards.

None

1997-12-31T23:59:59.000Z

198

EMIS Quick User Guide Search page (details on page 2)  

E-Print Network [OSTI]

search terms in foreign languages You can enter search terms in foreign languages by: - Using your: Please note that we have a Cyrillic and Arabic keyboards available through the Search page. EnteringEMIS Quick User Guide Search page (details on page 2) The News page: Access the latest news

Barthelat, Francois

199

Detailed Information on Proposal for US-Monbusho Collaoration  

E-Print Network [OSTI]

C / He /Ceramic Breeder / Be material system - Key: Measure interface thermal resistance at the Si be significant (T-breeding) · Beryllium (typically): Tmax thermal resistance between ceramicDetailed Information on Proposal for UNICEX-Hi US-Monbusho Collaoration Thermal

Abdou, Mohamed

200

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

202

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

203

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

204

Fort Irwin Integrated Resource Assessment. Volume 2, Baseline detail  

SciTech Connect (OSTI)

This report documents the assessment of baseline energy use at Fort Irwin, a US Army Forces Command facility near Barstow, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) has tasked the US Department of Energy (DOE) Federal Energy Management Program (FEMP), supported by the Pacific Northwest Laboratory (PNL), to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Irwin. This is part of a model program that PNL has designed to support energy-use decisions in the federal sector. This program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Irwin. This analysis examines the characteristics of electric, propane gas, and vehicle fuel use for a typical operating year. It records energy-use intensities for the facilities at Fort Irwin by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that accounts for all energy use among buildings, utilities, and applicable losses.

Richman, E.E.; Keller, J.M.; Dittmer, A.L.; Hadley, D.L.

1994-01-01T23:59:59.000Z

205

Fort Stewart integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect (OSTI)

This report documents the assessment of baseline energy use at Fort Stewart, a US Army Forces Command facility located near Savannah, Georgia. This is a companion report to Volume 1, Executive Summary, and Volume 3, Integrated Resource Assessment. The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Stewart. PNL, in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP), has designed a model program applicable to the federal sector for this purpose. The model program (1) identifies and evaluates all cost-effective energy projects; (2) develops a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) targets 100% of the financing required to implement energy efficiency projects. PNL applied this model program to Fort Stewart. The analysis examines the characteristics of electric, natural gas, oil, propane, and wood chip use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Fort Stewart by building type, fuel type, and energy end use. A complete energy consumption reconciliation is presented that accounts for the distribution of all major energy uses and losses among buildings, utilities, and central systems.

Keller, J.M.; Sullivan, G.P.; Wahlstrom, R.R.; Larson, L.L.

1993-08-01T23:59:59.000Z

206

Project X RFQ EM Design  

SciTech Connect (OSTI)

Project X is a proposed multi-MW proton facility at Fermi National Accelerator Laboratory (FNAL). The Project X front-end would consist of an H- ion source, a low-energy beam transport (LEBT), a CW 162.5 MHz radio-frequency quadrupole (RFQ) accelerator, and a medium-energy beam transport (MEBT). Lawrence Berkeley National Laboratory (LBNL) and FNAL collaboration is currently developing the designs for various components in the Project X front end. This paper reports the detailed EM design of the CW 162.5 MHz RFQ that provides bunching of the 1-10 mA H- beam with acceleration from 30 keV to 2.1 MeV.

Romanov, Gennady; /Fermilab; Hoff, Matthew; Li, Derun; Staples, John; Virostek, Steve; /LBNL

2012-05-09T23:59:59.000Z

207

Integrated Project Management System description  

SciTech Connect (OSTI)

The Integrated Program Management System (IPMS) Description is a ``working`` document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ``why`` and ``what is expected`` is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately.

NONE

1994-09-01T23:59:59.000Z

208

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

209

u.s. DEPART1IENT OF ENERGY EE RE PROJECT MANAGEMDH CENTER NEPA...  

Broader source: Energy.gov (indexed) [DOE]

hand protection gloves. ORPC has an established Safety Manual which details safety procedures specifIC to the project activities that will be employed and monitored...

210

Project Earth Lover  

SciTech Connect (OSTI)

Under this project, the Ponca Tribe of Nebraska (PTN) will conduct An Energy Options Analysis (EOA) to empower Tribal Leadership with critical information to allow them to effectively screen energy options that will further develop the Tribe's long-term strategic plan and energy vision. The PTN will also provide community workshops to enhance Tribal Members' capabilities, skills and awareness of energy efficiency and conservation technology and practices. A 90- minute workshop will be conducted at each of the 5 sites and one-hundred tribal members will receive an erergy efficiency kit.

Slobotski, Stephanie,

2011-09-01T23:59:59.000Z

211

The STACEE Project  

E-Print Network [OSTI]

The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

Ong, R A; Ong, Rene A.; Covault, Corbin E.

1997-01-01T23:59:59.000Z

212

The STACEE Project  

E-Print Network [OSTI]

The Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) is a telescope designed to explore the gamma-ray sky between 20 and 250 GeV using the atmospheric Cherenkov technique. STACEE is currently under construction. When completed, it will use 48 large heliostat mirrors at the solar research facility at Sandia National Laboratories (Albuquerque, NM) to reflect Cherenkov light created in gamma-ray air showers to secondary mirrors on a central tower. The secondary mirrors image this light onto photomultiplier tube cameras. This paper provides an overview of the STACEE project, including a description of the experimental site and an outline of the current design for the detector components.

Rene A. Ong; Corbin E. Covault

1997-11-25T23:59:59.000Z

213

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

214

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

215

California Hydrogen Infrastructure Project  

SciTech Connect (OSTI)

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a ???¢????????real-world???¢??????? retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation???¢????????s hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products???¢???????? Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user???¢????????s fueling experience.

Edward C. Heydorn

2013-03-12T23:59:59.000Z

216

Towards a detailed soot model for internal combustion engines  

SciTech Connect (OSTI)

In this work, we present a detailed model for the formation of soot in internal combustion engines describing not only bulk quantities such as soot mass, number density, volume fraction, and surface area but also the morphology and chemical composition of soot aggregates. The new model is based on the Stochastic Reactor Model (SRM) engine code, which uses detailed chemistry and takes into account convective heat transfer and turbulent mixing, and the soot formation is accounted for by SWEEP, a population balance solver based on a Monte Carlo method. In order to couple the gas-phase to the particulate phase, a detailed chemical kinetic mechanism describing the combustion of Primary Reference Fuels (PRFs) is extended to include small Polycyclic Aromatic Hydrocarbons (PAHs) such as pyrene, which function as soot precursor species for particle inception in the soot model. Apart from providing averaged quantities as functions of crank angle like soot mass, volume fraction, aggregate diameter, and the number of primary particles per aggregate for example, the integrated model also gives detailed information such as aggregate and primary particle size distribution functions. In addition, specifics about aggregate structure and composition, including C/H ratio and PAH ring count distributions, and images similar to those produced with Transmission Electron Microscopes (TEMs), can be obtained. The new model is applied to simulate an n-heptane fuelled Homogeneous Charge Compression Ignition (HCCI) engine which is operated at an equivalence ratio of 1.93. In-cylinder pressure and heat release predictions show satisfactory agreement with measurements. Furthermore, simulated aggregate size distributions as well as their time evolution are found to qualitatively agree with those obtained experimentally through snatch sampling. It is also observed both in the experiment as well as in the simulation that aggregates in the trapped residual gases play a vital role in the soot formation process. (author)

Mosbach, Sebastian; Celnik, Matthew S.; Raj, Abhijeet; Kraft, Markus [Department of Chemical Engineering and Biotechnology, University of Cambridge, Pembroke Street, Cambridge CB2 3RA (United Kingdom); Zhang, Hongzhi R. [Department of Chemical Engineering, University of Utah, 1495 East 100 South, Kennecott Research Building, Salt Lake City, UT 84112 (United States); Kubo, Shuichi [Frontier Research Center, Toyota Central R and D Labs., Inc., Nagakute, Aichi 480-1192 (Japan); Kim, Kyoung-Oh [Higashifuji Technical Center, Toyota Motor Corporation, Mishuku 1200, Susono, Shizuoka 480-1193 (Japan)

2009-06-15T23:59:59.000Z

217

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

Herbinet, O; Pitz, W J; Westbrook, C K

2007-09-20T23:59:59.000Z

218

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO2 production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

Herbinet, O; Pitz, W J; Westbrook, C K

2007-09-17T23:59:59.000Z

219

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran and co-workers for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet-stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels. (author)

Herbinet, Olivier; Pitz, William J.; Westbrook, Charles K. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States)

2008-08-15T23:59:59.000Z

220

Separations innovative concepts: Project summary  

SciTech Connect (OSTI)

This project summary includes the results of 10 innovations that were funded under the US Department's Innovative Concept Programs. The concepts address innovations that can substantially reduce the energy used in industrial separations. Each paper describes the proposed concept, and discusses the concept's potential energy savings, market applications, technical feasibility, prior work and state of the art, and future development needs.

Lee, V.E. (ed.)

1988-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

An analysis of battery electric vehicle production projections  

E-Print Network [OSTI]

In mid 2008 and early 2009 Deutsche Bank and The Boston Consulting Group each released separate reports detailing projected Battery Electric Vehicle production through 2020. These reports both outlined scenarios in which ...

Cunningham, John Shamus

2009-01-01T23:59:59.000Z

222

MODULAR PEBBLE BED REACTOR PROJECT UNIVERSITY RESEARCH CONSORTIUM  

E-Print Network [OSTI]

Annual Report Page ii MODULAR PEBBLE BED REACTOR ABSTRACT This project is developing a fundamental. Publication of an archival journal article covering this work is being prepared. · Detailed gas reactor Abstract

223

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

224

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

225

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

226

Final project report  

SciTech Connect (OSTI)

The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

Nitin S. Baliga and Leroy Hood

2008-11-12T23:59:59.000Z

227

Final Project Report  

SciTech Connect (OSTI)

This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for intelligent nested environmental systems technologies (iNEST), which monitor and control energy flows and IEQ across a cascade of spaces from individuals desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoEs Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuses Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoEs website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

Bogucz, E A

2010-12-13T23:59:59.000Z

228

Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations.

IT Corporation, Las Vegas

2002-04-24T23:59:59.000Z

229

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

230

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

231

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

232

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

233

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

234

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

235

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

236

Evidence of cost growth under cost-plus and fixed-price contracting  

SciTech Connect (OSTI)

As defined by the US Department of Energy (DOE), privatization refers to a shifting of responsibilities for the completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the private sector. DOE`s new vision is to arrange cleanup work around incentives-based contracts, which are won via competitive bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a project has been negotiated. Conversely, cost-plus contracting offers weak incentives for contractors to select cost-minimizing production and management approaches. Because privatization explicitly allocates more risk to the contractor, it forces the government to better define its goals and methods. This study summarizes actual cost experiences with government contracts performed under cost-plus and fixed-price incentive structures at all levels of government. The first section provides some background on the problem of making contractor activity more cost-efficient. Following this are sections on the measurement of performance and the costs of projects, limitations on measurement, and findings of similar studies. The study concludes with appendices discussing the details of the performance measurement methodology and the project data sets used in the study.

Scott, M.J.; Paananaen, O.H.; Redgate, T.E.; Ulibarri, C.A.; Jaksch, J.A.

1998-09-01T23:59:59.000Z

237

NDCX-II project commencing at LBNL  

E-Print Network [OSTI]

Department of Energy prepared by LBNL under Contract No. DE-NDCX-II project commencing at LBNL Alex Friedman, LLNL,and Joe Kwan, LBNL Construction is beginning on the second

Friedman, Alex

2010-01-01T23:59:59.000Z

238

Project evaluation : a practical asset pricing method  

E-Print Network [OSTI]

This paper presents a practical approach to project evaluation using techniques of modern financial economics, with a sample application to oil development under a complex tax system. The method overcomes shortcomings of ...

Jacoby, Henry D.

1992-01-01T23:59:59.000Z

239

Project management improves well control events  

SciTech Connect (OSTI)

During a well control operation, the efficient use of personnel and equipment, through good project management techniques, contributes to increased safety and ensures a quality project. The key to a successful blowout control project is to use all resources in the most efficient manner. Excessive use of resources leads to unnecessary expenditures and delays in bringing the project under control. The Kuwait well control project, which involved more than 700 blowouts, was accomplished in a much shorter time (8 months) than first estimated (5 years). This improvement partly resulted from the application of sound project management techniques. These projects were prime examples of the need for a formal project management approach to handling wild well projects. There are many examples of projects that were successful in controlling wells but were economic disasters. Only through the effective application of project management can complex well control projects be completed in reasonable time frames at reasonable cost. The paper describes team management, project scope, organizational structures, scheduling, tracking models, critical path method, and decision trees.

Oberlender, G.D. [Oklahoma State Univ., Stillwater, OK (United States); Abel, L.W. [Wild Well Control Inc., Spring, TX (United States)

1995-07-10T23:59:59.000Z

240

Material Stabilization Project Management Plan  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

SPEER, D.R.

1999-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Diffusive transport without detailed balance in motile bacteria: Does microbiology need statistical physics?  

E-Print Network [OSTI]

Microbiology is the science of microbes, particularly bacteria. Many bacteria are motile: they are capable of self-propulsion. Among these, a significant class execute so-called run-and-tumble motion: they follow a fairly straight path for a certain distance, then abruptly change direction before repeating the process. This dynamics has something in common with Brownian motion (it is diffusive at large scales), and also something in contrast. Specifically, motility parameters such as the run speed and tumble rate depend on the local environment and hence can vary in space. When they do so, even if a steady state is reached, this is not generally invariant under time-reversal: the principle of detailed balance, which restores the microscopic time-reversal symmetry of systems in thermal equilibrium, is mesoscopically absent in motile bacteria. This lack of detailed balance (allowed by the flux of chemical energy that drives motility) creates pitfalls for the unwary modeller. Here I review some statistical mechanical models for bacterial motility, presenting them as a paradigm for exploring diffusion without detailed balance. I also discuss the extent to which statistical physics is useful in understanding real or potential microbiological experiments.

M. E. Cates

2012-08-20T23:59:59.000Z

242

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

243

Wind for Schools Project Power System Brief  

SciTech Connect (OSTI)

This fact sheet provides an overview of the system components of a Wind Powering America Wind for Schools project. Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream(TM) wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. A detailed description of each system component is provided in this document.

Not Available

2007-08-01T23:59:59.000Z

244

Waste management project technical baseline description  

SciTech Connect (OSTI)

A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

Sederburg, J.P.

1997-08-13T23:59:59.000Z

245

The Aurora and Medusa Projects Stan Zdonik  

E-Print Network [OSTI]

The Aurora and Medusa Projects Stan Zdonik Brown University sbz@cs.brown.edu Michael Stonebraker. The Aurora project being implemented at Brown and Brandeis under the direction of U?? gur C? etintemel, Mitch to maximize quality of service for connecting applications. A further goal of Aurora is to extend this engine

Gummadi, Ramakrishna

246

The Aurora and Medusa Projects Stan Zdonik  

E-Print Network [OSTI]

The Aurora and Medusa Projects Stan Zdonik Brown University sbz@cs.brown.edu Michael Stonebraker. The Aurora project being implemented at Brown and Brandeis under the direction of Ugur C¸ etintemel, Mitch to maximize quality of service for connecting applications. A further goal of Aurora is to extend this engine

Balazinska, Magdalena

247

Detailed balance limit of power conversion efficiency for organic photovoltaics  

SciTech Connect (OSTI)

A fundamental difference between inorganic photovoltaic (IPV) and organic photovoltaic (OPV) cells is that charges are generated at the interface in OPV cells, while free charges can be generated in the bulk in IPV cells. In OPV cells, charge generation involves intrinsic energy losses to dissociate excitons at the interface between the donor and acceptor. By taking into account the energy losses, we show the theoretical limits of the power conversion efficiency set by radiative recombination of the carriers on the basis of the detailed balance relation between radiation from the cell and black-body radiation.

Seki, Kazuhiko, E-mail: k-seki@aist.go.jp [NRI, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)] [NRI, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan); Furube, Akihiro [RIIF, AIST Tsukuba Central 2, Umezono 1-1-1, Tsukuba, Ibaraki 305-8568 (Japan)] [RIIF, AIST Tsukuba Central 2, Umezono 1-1-1, Tsukuba, Ibaraki 305-8568 (Japan); Yoshida, Yuji [RCPVT, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)] [RCPVT, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)

2013-12-16T23:59:59.000Z

248

Detailed Chemical Analysis of Two Giants in the SGR DSPH  

E-Print Network [OSTI]

The 8m class telescopes allow for the first time to study stars of external galaxies with the same resolution and S/N ratio which has been so far used for Galactic stars. It is quite likely that this study will shake some of our current beliefs. In this poster we highlight some of the results which have been obtained for two giants in the Sgr dSph thanks to the UVES spectrograph on the ESO 8.2m Kueyen telescope. Further details on the observations and data analysis may be found in Bonifacio et al (2000).

P. Bonifacio; P. Molaro

2001-01-23T23:59:59.000Z

249

Detail Shot Of Mira | Argonne Leadership Computing Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density, andagingabout InfluenzaDetail Shot Of

250

Detailed Characterization of Particulates Emitted by Pre-Commercial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density, andagingabout InfluenzaDetail Shot

251

New Measurement Explores Fine Details of Proton Structure | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andDataNational Library of1,DepartmentMeasurement Explores Fine Details

252

Buildings and Energy in the 80's -- Detailed Tables  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquidsYearReserves (Billion5:July 22, 20131Detailed

253

Electric Utility Sales and Revenue - EIA-826 detailed data file  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0, 1997Environment > Voluntary826 detailed data The Form

254

Blundell 2 Power Plant Details | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: Energy ResourcesJersey:formBlue Energy Address:Bluestem Electric CoopDetails

255

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layeredof Energy Two CompaniesTwo Studies Reveal Details of

256

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layeredof Energy Two CompaniesTwo Studies Reveal Details ofTwo

257

Atomistic Details of the Associative Phosphodiester Cleavage in Human  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone byDear Friend,ArthurMaterialsRibonuclease H. | EMSL Details

258

Sandia National Laboratories: 2014 PV Systems Symposium Details  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwardsSafeguards andSan$0.06 per09Engineer AwardDetails

259

WASTE DESCRIPTION TYPE OF PROJECT POUNDS REDUCED,  

E-Print Network [OSTI]

Fuel oil and Turkey Based Biofuel Energy Rocovery 12,000 Industrial Waste $30,000 $500 $29,500 1500WASTE DESCRIPTION TYPE OF PROJECT POUNDS REDUCED, REUSED, RECYCLED OR CONSERVED IN 2006 WASTE TYPE DESCRIPTION DETAILS * Aerosol Can Disposal System Recycling 528 66 pounds of hazardous waste per unit $7

260

Time frames for geothermal project development  

SciTech Connect (OSTI)

Geothermal development can generally be broken down into distinct phases: Exploration and Leasing; Project Development And Feasibility Studies; Well Field Development; Project Finance, Construction and Start-up Operations; and Commercial Operations. Each phase represents different levels of cost and risk and different types of management teams that are needed to assess and manage the project and associated risk. Orderly transitions of management at each major phase are needed. Exploration programs are largely science based, the primary focus of the science based investigations should be to: secure the lease position, and develop sufficient information to identify and characterize an economical geothermal resource. Project development specialists build on the exploration data to: pull together a project design, develop a detailed cost estimate; prepare an environmental assessment; and collect all data needed for project financing. Construction specialist build from the development phase to: develop detailed engineering, procure equipment and materials, schedule and manage the facilities construction programs, and start and test the power plant. Operations specialists take over from construction during start-up and are responsible for sustainable and reliable operations of the resource and power generation equipment over the life of the project.

McClain, David W.

2001-04-17T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.  

SciTech Connect (OSTI)

This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

Childs, Allen B.

2002-03-01T23:59:59.000Z

262

Off-Balance Sheet Financing for Industrial Energy Efficiency Projects  

E-Print Network [OSTI]

Traditionally, energy efficiency projects have been financed by energy service companies (ESCOs) under a shared savings arrangement known as performance contracting. Essentially, performance contracting packages engineering, procurement...

Williams, S. J.

263

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy...

264

Project Profile: Novel Thermal Energy Storage Systems for Concentratin...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solar Power Project Profile: Novel Thermal Energy Storage Systems for Concentrating Solar Power University of Connecticut logo The University of Connecticut, under the Thermal...

265

NNSA Applauds Y-12 for Completing Potable Water Project Ahead...  

National Nuclear Security Administration (NNSA)

Applauds Y-12 for Completing Potable Water Project Ahead of Schedule and Under Budget | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

266

Regulation of Tidal and Wave Energy Projects (Maine)  

Broader source: Energy.gov [DOE]

State regulation of tidal and wave energy projects is covered under the Maine Waterway Development and Conservation Act (MWDCA), and complements regulation by the Federal Energy Regulation...

267

Uniform Methods Project for Determining Energy Efficiency Program Savings  

Office of Energy Efficiency and Renewable Energy (EERE)

Under the Uniform Methods Project, DOE is developing a set of protocols for determining savings from energy efficiency measures and programs. The protocols provide a straightforward method for...

268

Project Profile: Sensible Heat, Direct, Dual-Media Thermal Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sensible Heat, Direct, Dual-Media Thermal Energy Storage Module Project Profile: Sensible Heat, Direct, Dual-Media Thermal Energy Storage Module Acciona logo Acciona Solar, under...

269

Detailed Physical Trough Model for NREL's Solar Advisor Model: Preprint  

SciTech Connect (OSTI)

Solar Advisor Model (SAM) is a free software package made available by the National Renewable Energy Laboratory (NREL), Sandia National Laboratory, and the US Department of Energy. SAM contains hourly system performance and economic models for concentrating solar power (CSP) systems, photovoltaic, solar hot-water, and generic fuel-use technologies. Versions of SAM prior to 2010 included only the parabolic trough model based on Excelergy. This model uses top-level empirical performance curves to characterize plant behavior, and thus is limited in predictive capability for new technologies or component configurations. To address this and other functionality challenges, a new trough model; derived from physical first principles was commissioned to supplement the Excelergy-based empirical model. This new 'physical model' approaches the task of characterizing the performance of the whole parabolic trough plant by replacing empirical curve-fit relationships with more detailed calculations where practical. The resulting model matches the annual performance of the SAM empirical model (which has been previously verified with plant data) while maintaining run-times compatible with parametric analysis, adding additional flexibility in modeled system configurations, and providing more detailed performance calculations in the solar field, power block, piping, and storage subsystems.

Wagner, M. J.; Blair, N.; Dobos, A.

2010-10-01T23:59:59.000Z

270

Detailed computation of hot-plasma atomic spectra  

E-Print Network [OSTI]

We present recent evolutions of the detailed opacity code SCO-RCG which combines statistical modelings of levels and lines with fine-structure calculations. The code now includes the Partially-Resolved-Transition-Array model, which allows one to replace a complex transition array by a small-scale detailed calculation preserving energy and variance of the genuine transition array and yielding improved high-order moments. An approximate method for studying the impact of strong magnetic field on opacity and emissivity was also recently implemented. The Zeeman line profile is modeled by fourth-order Gram-Charlier expansion series, which is a Gaussian multiplied by a linear combination of Hermite polynomials. Electron collisional line broadening is often modeled by a Lorentzian function and one has to calculate the convolution of a Lorentzian with Gram-Charlier distribution for a huge number of spectral lines. Since the numerical cost of the direct convolution would be prohibitive, we propose, in order to obtain t...

Pain, Jean-Christophe; Blenski, Thomas

2015-01-01T23:59:59.000Z

271

NCMS PWB Surface Finishes Team project summary  

SciTech Connect (OSTI)

The NCMS PWB Surface Finishes Consortium is just about at the end of the five year program. Dozens of projects related to surface finishes and PWB solder-ability were performed by the team throughout the program, and many of them are listed in this paper. They are listed with a cross reference to where and when a technical paper was presented describing the results of the research. However, due to time and space constraints, this paper can summarize the details of only three of the major research projects accomplished by the team. The first project described is an ``Evaluation of PWB Surface Finishes.`` It describes the solderability, reliability, and wire bondability of numerous surface finishes. The second project outlined is an ``Evaluation of PWB Solderability Test Methods.`` The third project outlined is the ``Development and Evaluation of Organic Solderability Preservatives.``

Kokas, J.; DeSantis, C. [United Technologies Corp., Farmington, CT (United States). Hamilton Standard Div.; Wenger, G. [AT and T, New York, NY (United States)] [and others

1996-04-01T23:59:59.000Z

272

New Mexico State University Arrowhead Center PROSPER Project  

SciTech Connect (OSTI)

This document is the final technical report of the Arrowhead Center Prosper Project at New Mexico State University. The Prosper Project was a research and public policy initiative funded by the National Energy Technology Laboratory (NETL) of the U.S. Department of Energy (DOE). The Prosper project (DOE Grant Number DE-NT0004397) began on October 1, 2008 (FY2009, Quarter 1) and ended on December 31, 2012 (FY2013, Quarter 1). All project milestones were completed on time and within the budget. This report contains a summary of ten technical reports resulting from research conducted during the project. This report also contains a detailed description of the research dissemination and outreach activities of the project including a description of the policy impacts of the project. The report also describes project activities that will be maintained after the end of the project.

Peach, James

2012-12-31T23:59:59.000Z

273

NERI PROJECT 99-119. TASK 2. DATA-DRIVEN PREDICTION OF PROCESS VARIABLES. FINAL REPORT  

SciTech Connect (OSTI)

This report describes the detailed results for task 2 of DOE-NERI project number 99-119 entitled ''Automatic Development of Highly Reliable Control Architecture for Future Nuclear Power Plants''. This project is a collaboration effort between the Oak Ridge National Laboratory (ORNL,) The University of Tennessee, Knoxville (UTK) and the North Carolina State University (NCSU). UTK is the lead organization for Task 2 under contract number DE-FG03-99SF21906. Under task 2 we completed the development of data-driven models for the characterization of sub-system dynamics for predicting state variables, control functions, and expected control actions. We have also developed the ''Principal Component Analysis (PCA)'' approach for mapping system measurements, and a nonlinear system modeling approach called the ''Group Method of Data Handling (GMDH)'' with rational functions, and includes temporal data information for transient characterization. The majority of the results are presented in detailed reports for Phases 1 through 3 of our research, which are attached to this report.

Upadhyaya, B.R.

2003-04-10T23:59:59.000Z

274

THE ADVANCED CHEMISTRY BASINS PROJECT  

SciTech Connect (OSTI)

In the next decades, oil exploration by majors and independents will increasingly be in remote, inaccessible areas, or in areas where there has been extensive shallow exploration but deeper exploration potential may remain; areas where the collection of data is expensive, difficult, or even impossible, and where the most efficient use of existing data can drive the economics of the target. The ability to read hydrocarbon chemistry in terms of subsurface migration processes by relating it to the evolution of the basin and fluid migration is perhaps the single technological capability that could most improve our ability to explore effectively because it would allow us to use a vast store of existing or easily collected chemical data to determine the major migration pathways in a basin and to determine if there is deep exploration potential. To this end a the DOE funded a joint effort between California Institute of Technology, Cornell University, and GeoGroup Inc. to assemble a representative set of maturity and maturation kinetic models and develop an advanced basin model able to predict the chemistry of hydrocarbons in a basin from this input data. The four year project is now completed and has produced set of public domain maturity indicator and maturation kinetic data set, an oil chemistry and flash calculation tool operable under Excel, and a user friendly, graphically intuitive basin model that uses this data and flash tool, operates on a PC, and simulates hydrocarbon generation and migration and the chemical changes that can occur during migration (such as phase separation and gas washing). The DOE Advanced Chemistry Basin Model includes a number of new methods that represent advances over current technology. The model is built around the concept of handling arbitrarily detailed chemical composition of fluids in a robust finite-element 2-D grid. There are three themes on which the model focuses: chemical kinetic and equilibrium reaction parameters, chemical phase equilibrium, and physical flow through porous media. The chemical kinetic scheme includes thermal indicators including vitrinite, sterane ratios, hopane ratios, and diamonoids; and a user-modifiable reaction network for primary and secondary maturation. Also provided is a database of type-specific kerogen maturation schemes. The phase equilibrium scheme includes modules for primary and secondary migration, multi-phase equilibrium (flash) calculations, and viscosity predictions.

William Goddard; Peter Meulbroek; Yongchun Tang; Lawrence Cathles III

2004-04-05T23:59:59.000Z

275

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings  

SciTech Connect (OSTI)

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.

NONE

1995-09-01T23:59:59.000Z

276

River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2  

SciTech Connect (OSTI)

The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

Project Integration

2005-09-26T23:59:59.000Z

277

ACOUSTIC EMISSION MONITORING FOR ASSESSMENT OF STEEL BRIDGE DETAILS  

E-Print Network [OSTI]

crack locations were made by monitoring AE under normal service loads (e.g., live traffic and wind). AE of surfaces in the crack wake, the exact mechanism is not of great im- portance to the structural engineer con- stants. This seems to be a useful relationship in both the laboratory and the field. Roberts #12

278

Detailed Work Plan for Development of a Hawai`i  

E-Print Network [OSTI]

Subtask 9.1 First Deliverable By the University of Hawaii Hawaii Natural Energy Institute School of Ocean energy and economic security and sustainability. Moreover, unlike wind, solar, geothermal, or ocean.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847

279

extension.uci.edu/apm AdvancedProjectManagement  

E-Print Network [OSTI]

exams offered through the Project Management Institute, Inc. Program Management Professional (PgMP) PMI Scheduling Professional (PMI-SP) PMI Agile Certified Practitioner (PMI-ACP) Visit the Project Management Institute at pmi.org for more details. Certificate Requirements Individuals must complete courses totaling

Rose, Michael R.

280

A detailed spectroscopic study of an Italian fresco  

SciTech Connect (OSTI)

In the present work we characterized samples of plasters and pictorial layers taken from a fresco in the Acireale Cathedral. The fresco represents the Coronation of Saint Venera, patron saint of this Ionian town. By performing a detailed spectroscopic analysis of the plaster preparation layer by Fourier-transform infrared (FTIR) spectroscopy and x-ray diffraction (XRD), and of the painting layer by FTIR and confocal Raman microspectroscopy, scanning electron microscopy+energy dispersive x-ray spectroscopy, and XRD, we were able to identify the pigments and the binders present. In particular, Raman investigation was crucial to the characterization of the pigments thanks to the high resolution of the confocal apparatus used. It is worth stressing that the simultaneous use of complementary techniques was able to provide more complete information for the conservation of the artifact we studied.

Barilaro, Donatella; Crupi, Vincenza; Majolino, Domenico; Barone, Germana; Ponterio, Rosina [Dipartimento di Fisica and Instituto Nazionale per la Fisica della Materia (INFM), Universita di Messina, Contrada Papardo, Salita Sperone 31, P.O. Box 55, 98166 Messina (Italy); Dipartimento di Scienze dalla Terra, Universita di Messina, Contrada Papardo, Salita Sperone 31, P.O. Box 55, 98166 Messina (Italy); Istituto per i Processi Chimico-Fisici del Consiglio Nazionale delle Ricerche-Istituto per i Processi Chimico Fisici (CNR-IPCF), Sezione di Messina, Via La Farina 237, 98123 Messina (Italy)

2005-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

282

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

283

Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report  

SciTech Connect (OSTI)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energyâ??s Wind and Hydropower Technologies Programâ??s goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

Craig W. Collar

2012-11-16T23:59:59.000Z

284

Summary Report of Geophysical Logging For The Seismic Boreholes Project at the Hanford Site Waste Treatment Plant.  

SciTech Connect (OSTI)

During the period of June through October 2006, three deep boreholes and one corehole were drilled beneath the site of the Waste Treatment Plant (WTP) at the U.S. Department of Energy (DOE) Hanford Site near Richland, Washington. The boreholes were drilled to provide information on ground-motion attenuation in the basalt and interbedded sediments underlying the WTP site. This report describes the geophysical logging of the deep boreholes that was conducted in support of the Seismic Boreholes Project, defined below. The detailed drilling and geological descriptions of the boreholes and seismic data collected and analysis of that data are reported elsewhere.

Gardner, Martin G.; Price, Randall K.

2007-02-01T23:59:59.000Z

285

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

286

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

287

RP-5 RENEWABLE ENERGY PROJECT  

SciTech Connect (OSTI)

This report is the first quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of July 12, 2002 (project inception) to September 30, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted to identify and analyze potential renewable energy technologies and verify its feasibility and suitability for the project. The report covers the two-day Energy Charrette that was held at the Inland Empire Utilities Agency (IEUA) Headquarters Building on May 8-9, 2002 to brainstorm, evaluate and present all available renewable energy options along with their implementations. Although the Energy Charrette was held prior to awarding of the DOE Grant, the outcome of the Charrette forms the basis of the activities that took place after July 12, 2002. Therefore, the Energy Charrette is frequently referenced and discussed in this report. The report also discusses the Energy Meeting that took place on September 24, 2002 between IEUA and CH2M Hill to follow up on the various presentations and recommendations resulting from the Energy Charrette. It should be noted that no final equipment data or capacities have been presented in the report, as the Conceptual Design has not started yet. This report covers continuing effort and work to complete the Request for Proposal (RFP) for this project. The Executive Summary Section covers more details on the scope of work, which consists of the conceptual, preliminary and final design, and what has been accomplished during the report period. Tools and methods utilized in this project to identify renewable energy technologies are included in the ''Experimental'' Section. Finally, Project achievements, implications and importance in improving this kind of technology are summarized in the ''Conclusion'' Section.

Neil Clifton, P.E.; Eliza Jane Whitman; Jamal A. Zughbi, P.E.

2002-10-30T23:59:59.000Z

288

Richland Environmental Restoration Project management action process document  

SciTech Connect (OSTI)

This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

NONE

1996-04-01T23:59:59.000Z

289

The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part II Availability of Flow and Water Quality Data for the Rio Grande Project Area  

E-Print Network [OSTI]

Cruces, NM 88003 (575) 646-4337 i i Acknowledgement This document and the underlying pr oject activities detailed in this report reflect the joint efforts of many people working with the Paso del Norte Watershed Council (PdNWC). The authors... wish to acknowledge and extend our grat itude to the U.S. Army Corps of Engineers for the generous financial support extende d to the PdNWC for development of the Coordinated Water Resources Database and Model Developm ent Project (called Project...

Tillery, Sue; Sheng, Zhuping; King, J. Phillip; Creel, Bobby; Brown, Christopher; Michelsen, Ari; Srinivasan, Raghavan; Granados, Alfredo

2009-01-01T23:59:59.000Z

290

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D...

291

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a projects infrastructure, limited to 5% of the net general revenues during the...

292

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

293

Device Oriented Project Controller  

SciTech Connect (OSTI)

This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

Dalesio, Leo; Kraimer, Martin

2013-11-20T23:59:59.000Z

294

Status of the NEMO Project  

E-Print Network [OSTI]

The NEMO project aims at the search, development and validation of key technologies for the construction, deployment and mantainance of an underwater Cherenkov km3 neutrino telescope in the Mediterranean Sea. Moreover, the NEMO Collaboration carried out a long term exploration of a 3500 m deep sea site close to the Sicilian coast; the study has shown that it is optimal for the installation of the detector. A Phase-1 project, which is under way, will validate the proposed technologies for the km3 detector on a Test Site at 2000 m depth. The realization of a new infrastructure on the candidate site (Phase-2 project) will provide the possibility to test detector components at 3500 m depth and will allow also a continuous monitoring of the site.

Piera Sapienza

2006-11-03T23:59:59.000Z

295

Costilla County Biodiesel Pilot Project  

SciTech Connect (OSTI)

The Costilla County Biodiesel Pilot Project has demonstrated the compatibility of biodiesel technology and economics on a local scale. The project has been committed to making homegrown biodiesel a viable form of community economic development. The project has benefited by reducing risks by building the facility gradually and avoiding large initial outlays of money for facilities and technologies. A primary advantage of this type of community-scale biodiesel production is that it allows for a relatively independent, local solution to fuel production. Successfully using locally sourced feedstocks and putting the fuel into local use emphasizes the feasibility of different business models under the biodiesel tent and that there is more than just a one size fits all template for successful biodiesel production.

Doon, Ben; Quintana, Dan

2011-08-25T23:59:59.000Z

296

Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.  

SciTech Connect (OSTI)

This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

Childs, Allen

2002-03-01T23:59:59.000Z

297

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

298

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

299

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

300

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

302

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

303

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

304

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

305

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

306

GRB 050822: Detailed analysis of an XRF observed by Swift  

E-Print Network [OSTI]

We report on the temporal and spectral characteristics of the early X-ray emission from the GRB 050822 as observed by Swift. This burst is likely to be an XRF showing major X-ray flares in its XRT light-curve. The quality of the data allows a detailed spectral analysis of the early afterglow in the X-ray band. During the X-ray flares, a positive correlation between the count rate and the spectral hardness (i.e. higher the count rate is and harder the spectrum is) is clearly seen for the X-ray flares. This behaviour similar to that seen for Gamma-ray pulses indicates that the energy peak of the spectrum is in the XRT energy band and it moves at lower energy with time. We show evidence for the possible detection of the emergence of the forward-shock emission produced at a radius larger than 4 x 10^{16} cm (a forming region clearly different to that producing the prompt emission). Finally, we show that the null detection of a jet break up to T_0+4 x 10^6s in the X-ray light curve of this XRF can be understood: i...

Godet, O; Osborne, J; Zhang, B; Burrows, D N; O'Brien, P T; Hill, J E; Racusin, J; Beardmore, A P; Goad, M R; Falcone, A; Morris, D C; Ziaeepour, H

2007-01-01T23:59:59.000Z

307

A detail study of defect models for cosmic structure formation  

E-Print Network [OSTI]

We calculate predictions from wide class of `active' models of cosmic structure formation which allows us to scan the space of possible defect models. We calculate the linear cold dark matter power spectrum and Cosmic Microwave Background (CMB) anisotropies over all observable scales using a full linear Einstein-Boltzmann code. Our main result, which has already been reported, points to a serious problem reconciling the observed amplitude of the large-scale galaxy distribution with the COBE normalization. Here, we describe our methods and results in detail. The problem is present for a wide range of defect parameters, which can be used to represent potential differences among defect models, as well as possible systematic numerical errors. We explicitly examine the impact of varying the defect model parameters and we show how the results substantiate these conclusions. The standard scaling defect models are in serious conflict with the current data, and we show how attempts to resolve the problem by considering non-scaling defects or modified stress-energy components would require radical departures from what has become the standard picture.

A. Albrecht; R. A. Battye; J. Robinson

1997-11-27T23:59:59.000Z

308

Evolution Effects on Parton Energy Loss with Detailed Balance  

E-Print Network [OSTI]

The initial conditions in the chemical non-equilibrated medium and Bjorken expanding medium at RHIC are determined. With a set of rate equations describing the chemical equilibration of quarks and gluons based on perturbative QCD, we investigate the consequence for parton evolution at RHIC. With considering parton evolution, it is shown that the Debye screening mass and the inverse mean free-path of gluons reduce with increasing proper time in the QGP medium. The parton evolution affects the parton energy loss with detailed balance, both parton energy loss from stimulated emission in the chemical non-equilibrated expanding medium and in Bjorken expanding medium are linear dependent on the propagating distance rather than square dependent in the static medium. The energy absorption can not be neglected at intermediate jet energies and small propagating distance of the energetic parton in contrast with that it is important only at intermediate jet energy in the static medium. This will increase the energy and propagating distance dependence of the parton energy loss and will affect the shape of suppression of moderately high P_T hadron spectra.

Luan cheng; Enke Wang

2010-04-30T23:59:59.000Z

309

Flow Effects on Jet Energy Loss with Detailed Balance  

E-Print Network [OSTI]

In the presence of collective flow a new model potential describing the interaction of the hard jet with scattering centers is derived based on the static color-screened Yukawa potential. The flow effect on jet quenching with detailed balance is investigated in pQCD. It turns out, considering the collective flow with velocity $v_z$ along the jet direction, the collective flow decreases the LPM destructive interference comparing to that in the static medium. The gluon absorption plays a more important role in the moving medium. The collective flow increases the energy gain from gluon absorption, however, decreases the energy loss from gluon radiation, which is $(1 - v_z )$ times as that in the static medium to the first order of opacity. In the presence of collective flow, the second order in opacity correction is relatively small compared to the first order. So that the total effective energy loss is decreased. The flow dependence of the energy loss will affect the suppression of high $p_T$ hadron spectrum and anisotropy parameter $v_2$ in high-energy heavy-ion collisions.

Luan Cheng; Jia Liu; Enke Wang

2014-06-03T23:59:59.000Z

310

Detailed model for practical pulverized coal furnaces and gasifiers  

SciTech Connect (OSTI)

The need to improve efficiency and reduce pollutant emissions commercial furnaces has prompted energy companies to search for optimized operating conditions and improved designs in their fossil-fuel burning facilities. Historically, companies have relied on the use of empirical correlations and pilot-plant data to make decisions about operating conditions and design changes. The high cost of collecting data makes obtaining large amounts of data infeasible. The main objective of the data book is to provide a single source of detailed three-dimensional combustion and combustion-related data suitable for comprehensive combustion model evaluation. Five tasks were identified as requirements to achieve the main objective. First, identify the types of data needed to evaluate comprehensive combustion models, and establish criteria for selecting the data. Second, identify and document available three-dimensional combustion data related to pulverized coal combustion. Third, collect and evaluate three-dimensional data cases, and select suitable cases based on selection criteria. Fourth, organize the data sets into an easy-to-use format. Fifth, evaluate and interpret the nature and quality of the data base. 39 refs., 15 figs., 14 tabs.

Philips, S.D.; Smoot, L.D.

1989-08-01T23:59:59.000Z

311

ANG coal gasification project management control system report. [Great Plains project  

SciTech Connect (OSTI)

Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

Not Available

1981-01-01T23:59:59.000Z

312

Hanford Environmental Dose Reconstruction Project Monthly Report  

SciTech Connect (OSTI)

This monthly report summarizes the technical progress and project status for the Hanford Environmental Dose Reconstruction (HEDR) Project being conducted at Pacific Northwest Laboratory (PNL) under the direction of a Technical Steering Panel (TSP). The TSP is composed of experts in numerous technical fields related to this project and represents the interests of the public. The US Department of Energy (DOE) funds the project. The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks address each of the primary steps in the path from radioactive releases to dose estimates source terms, environmental transport, environmental monitoring data, demographics, agriculture, and food habits, and environmental pathways and dose estimates.

Finch, S.M. (comp.)

1990-05-01T23:59:59.000Z

313

Plant biodiversity and ethnobotany inside the projected impact area of the Upper Seti Hydropower Project,  

E-Print Network [OSTI]

Plant biodiversity and ethnobotany inside the projected impact area of the Upper Seti Hydropower hydropower project, currently under feasibility study. The objective of the study was to document plant the construction of major hydropower infrastructure (Pokharel 2001; Bartle 2002). However, potential impacts

Asselin, Hugo

314

Diffusive transport without detailed balance in motile bacteria: Does microbiology need statistical physics?  

E-Print Network [OSTI]

Microbiology is the science of microbes, particularly bacteria. Many bacteria are motile: they are capable of self-propulsion. Among these, a significant class execute so-called run-and-tumble motion: they follow a fairly straight path for a certain distance, then abruptly change direction before repeating the process. This dynamics has something in common with Brownian motion (it is diffusive at large scales), and also something in contrast. Specifically, motility parameters such as the run speed and tumble rate depend on the local environment and hence can vary in space. When they do so, even if a steady state is reached, this is not generally invariant under time-reversal: the principle of detailed balance, which restores the microscopic time-reversal symmetry of systems in thermal equilibrium, is mesoscopically absent in motile bacteria. This lack of detailed balance (allowed by the flux of chemical energy that drives motility) creates pitfalls for the unwary modeller. Here I review some statistical mecha...

Cates, M E

2012-01-01T23:59:59.000Z

315

Development of Detailed Kinetic Models for Fischer-Tropsch Fuels  

SciTech Connect (OSTI)

Fischer-Tropsch (FT) fuels can be synthesized from a syngas stream generated by the gasification of biomass. As such they have the potential to be a renewable hydrocarbon fuel with many desirable properties. However, both the chemical and physical properties are somewhat different from the petroleum-based hydrocarbons that they might replace, and it is important to account for such differences when considering using them as replacements for conventional fuels in devices such as diesel engines and gas turbines. FT fuels generally contain iso-alkanes with one or two substituted methyl groups to meet the pour-point specifications. Although models have been developed for smaller branched alkanes such as isooctane, additional efforts are required to properly capture the kinetics of the larger branched alkanes. Recently, Westbrook et al. developed a chemical kinetic model that can be used to represent the entire series of n-alkanes from C{sub 1} to C{sub 16} (Figure 1). In the current work, the model is extended to treat 2,2,4,4,6,8,8-heptamethylnonane (HMN), a large iso-alkane. The same reaction rate rules used in the iso-octane mechanism were incorporated in the HMN mechanism. Both high and low temperature chemistry was included so that the chemical kinetic model would be applicable to advanced internal combustion engines using low temperature combustion strategies. The chemical kinetic model consists of 1114 species and 4468 reactions. Concurrently with this effort, work is underway to improve the details of specific reaction classes in the mechanism, guided by high-level electronic structure calculations. Attention is focused upon development of accurate rate rules for abstraction of the tertiary hydrogens present in branched alkanes and properly accounting for the pressure dependence of the ?-scission, isomerization, and R + O{sub 2} reactions.

Westbrook, C K; Pitz, W J; Carstensen, H; Dean, A M

2008-10-28T23:59:59.000Z

316

Waste receiving and processing facility module 1, detailed design report  

SciTech Connect (OSTI)

WRAP 1 baseline documents which guided the technical development of the Title design included: (a) A/E Statement of Work (SOW) Revision 4C: This DOE-RL contractual document specified the workscope, deliverables, schedule, method of performance and reference criteria for the Title design preparation. (b) Functional Design Criteria (FDC) Revision 1: This DOE-RL technical criteria document specified the overall operational criteria for the facility. The document was a Revision 0 at the beginning of the design and advanced to Revision 1 during the tenure of the Title design. (c) Supplemental Design Requirements Document (SDRD) Revision 3: This baseline criteria document prepared by WHC for DOE-RL augments the FDC by providing further definition of the process, operational safety, and facility requirements to the A/E for guidance in preparing the design. The document was at a very preliminary stage at the onset of Title design and was revised in concert with the results of the engineering studies that were performed to resolve the numerous technical issues that the project faced when Title I was initiated, as well as, by requirements established during the course of the Title II design.

Not Available

1993-10-01T23:59:59.000Z

317

Ponnequin Wind Energy Project Weld County, Colorado  

SciTech Connect (OSTI)

The purpose of this environmental assessment (EA) is to provide the U.S. Department of Energy (DOE) and the public with information on potential environmental impacts associated with the development of the Ponnequin Wind Energy Project in Colorado. This EA and public comments received on it will be used in DOE`s deliberations on whether to release funding for the project. This document provides a detailed description of the proposed project and an assessment of potential impacts associated with its construction and operations. Resources and conditions considered in the analysis include streams; wetlands; floodplains; water quality; soils; vegetation; air quality; socioeconomic conditions; energy resources; noise; transportation; cultural resources; visual and land use resources; public health and safety; wildlife; threatened, endangered, and candidate species; and cumulative impacts. The analysis found that the project would have minimal impacts on these resources and conditions, and would not create impacts that exceed the significance criteria defined in this document. 90 refs., 5 figs.

NONE

1997-08-01T23:59:59.000Z

318

Ten Projects Awarded NERSC Allocations under DOE's ALCC Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

support scientific and technological research in bioenergy, energy efficiency, turbomachinery design, fusion energy, high energy physics, materials science, nuclear physics,...

319

Nuclear Materials Safeguards and Security Upgrade Project Completed Under  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory | NationalJohnSecurityControls |

320

Ten Projects Awarded NERSC Allocations under DOE's ALCC Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManusScience and How ToMay HanfordOctober ResearchTen

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

322

Appendix 3-3-The complete model formulation for detailed multiple release software product simulation model  

E-Print Network [OSTI]

simulation model In this appendix the model formulations for the detailed simulation model (discussed

Rahmandad, Hazhir

323

FutureGen Project Report  

SciTech Connect (OSTI)

This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: Site evaluation and selection process and environmental characterization Underground Injection Control (UIC) Permit Application including well design and subsurface modeling FutureGen IGCC-CCS Design Basis Document Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report Process flow diagrams and heat/material balance for slurry-fed gasifier configuration Process flow diagrams and heat/material balance for dry-fed gasifier configuration Full capital cost report and cost category analysis (CAPEX) Full operating cost report and assumptions (OPEX) Comparative technology evaluations, value engineering exercises, and initial air permitting activities are also provided; the report concludes with schedule, risk, and cost mitigation activities as well as lessons learned such that the products of this report can be used to support future investments in utility scale gasification and carbon capture and sequestration. Collectively, the FutureGen project enabled the comprehensive site specific evaluation and determination of the economic viability of IGCC-CCS. The project report is bound at that determination when DOE formally proposed the FutureGen 2.0 project which focuses on repowering a pulverized coal power plant with oxy-combustion technology including CCS.

Cabe, Jim; Elliott, Mike

2010-09-30T23:59:59.000Z

324

W-320 Project thermal modeling  

SciTech Connect (OSTI)

This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

Sathyanarayana, K., Fluor Daniel Hanford

1997-03-18T23:59:59.000Z

325

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

326

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

327

Water Integration Project Science Strategies White Paper  

SciTech Connect (OSTI)

This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

Alan K. Yonk

2003-09-01T23:59:59.000Z

328

Density equalizing map projections (cartograms) in public health applications  

SciTech Connect (OSTI)

In studying geographic disease distributions, one normally compares rates among arbitrarily defined geographic subareas (e.g. census tracts), thereby sacrificing some of the geographic detail of the original data. The sparser the data, the larger the subareas must be in order to calculate stable rates. This dilemma is avoided with the technique of Density Equalizing Map Projections (DEMP){copyright}. Boundaries of geographic subregions are adjusted to equalize population density over the entire study area. Case locations plotted on the transformed map should have a uniform distribution if the underlying disease risk is constant. On the transformed map, the statistical analysis of the observed distribution is greatly simplified. Even for sparse distributions, the statistical significance of a supposed disease cluster can be calculated with validity. The DEMP algorithm was applied to a data set previously analyzed with conventional techniques; namely, 401 childhood cancer cases in four counties of California. The distribution of cases on the transformed map was analyzed visually and statistically. To check the validity of the method, the identical analysis was performed on 401 artificial cases randomly generated under the assumption of uniform risk. No statistically significant evidence for geographic non-uniformity of rates was found, in agreement with the original analysis performed by the California Department of Health Services.

Merrill, D.W.

1998-05-01T23:59:59.000Z

329

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

330

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

331

Validation of phasor calculations in the Macrodyne PMU for California-Oregon Transmission Project tests of March 1993  

SciTech Connect (OSTI)

Faults applied during March 1993 commissioning tests for the California-Oregon Transmission Project produced 14 Hz transient oscillations that were conspicuous in BPA`s enhanced transducers at Malin, and in PG and E`s Dynamic System Monitor at Table Mountain. Prony analysis of high speed fault data provided a detailed model for the underlying network resonance signal, and a basis for validating transient performance of a Macrodyne Phasor Measurement Unit (PMU) at the test site. This instrument, which is closely associated with EPRI`s FACTS project, provides useful insight into emerging technology for high speed digital transducers. The phasor calculations are found to be of very high quality, but filtering enhancements are recommended for broadband applications.

Hauer, J.F. [Pacific Northwest Labs., Richland, WA (United States)] [Pacific Northwest Labs., Richland, WA (United States)

1996-07-01T23:59:59.000Z

332

Remote sensing data exploiration for geologic characterization of difficult targets : Laboratory Directed Research and Development project 38703 final report.  

SciTech Connect (OSTI)

Characterizing the geology, geotechnical aspects, and rock properties of deep underground facility sites can enhance targeting strategies for both nuclear and conventional weapons. This report describes the results of a study to investigate the utility of remote spectral sensing for augmenting the geological and geotechnical information provided by traditional methods. The project primarily considered novel exploitation methods for space-based sensors, which allow clandestine collection of data from denied sites. The investigation focused on developing and applying novel data analysis methods to estimate geologic and geotechnical characteristics in the vicinity of deep underground facilities. Two such methods, one for measuring thermal rock properties and one for classifying rock types, were explored in detail. Several other data exploitation techniques, developed under other projects, were also examined for their potential utility in geologic characterization.

Costin, Laurence S.; Walker, Charles A.; Lappin, Allen R.; Hayat, Majeed M. (University of New Mexico, Albuquerque, NM); Ford, Bridget K.; Paskaleva, Biliana (University of New Mexico, Albuquerque, NM); Moya, Mary M.; Mercier, Jeffrey Alan (University of Arizona, Tucson, AZ); Stormont, John C. (University of New Mexico, Albuquerque, NM); Smith, Jody Lynn

2003-09-01T23:59:59.000Z

333

Physics from Angular Projection of Rectangular Grids  

E-Print Network [OSTI]

In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple, yet interesting problem, has both a scholarly value and applications for data extraction techniques to study the physics of various systems. Our work can interest undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential applications in various branches of physical sciences including crystallography, astrophysics and bulk properties of materials.

Ashmeet Singh

2014-12-08T23:59:59.000Z

334

Comparison of Construction Manager at Risk and Integrated Project Delivery Performance on Healthcare Projects: A Comparative Case Study  

E-Print Network [OSTI]

Comparison of Construction Manager at Risk and Integrated Project Delivery Performance on Healthcare Projects: A Comparative Case Study XXX, XXX, XXX, and XXX XXX XXXX XXXX XXX, XXXX#7;#7; This study provides information and a basic overview..., Integrated Project Delivery, Contracts #7;#7;Introduction For most of the 20th century, construction projects were primarily completed under the Design-Bid-Build (DBB) delivery method. As the building industry and global competition has increased, a demand...

Bilbo, David; Bigelow, Ben F.; Escamilla, Edelmiro; Lockwood, Christa

2014-04-03T23:59:59.000Z

335

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

336

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

337

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

338

HIGH PRESSURE COAL COMBUSTON KINETICS PROJECT  

SciTech Connect (OSTI)

As part of the U.S. Department of Energy (DoE) initiative to improve the efficiency of coal-fired power plants and reduce the pollution generated by these facilities, DOE has funded the High-Pressure Coal Combustion Kinetics (HPCCK) Projects. A series of laboratory experiments were conducted on selected pulverized coals at elevated pressures with the specific goals to provide new data for pressurized coal combustion that will help extend to high pressure and validate models for burnout, pollutant formation, and generate samples of solid combustion products for analyses to fill crucial gaps in knowledge of char morphology and fly ash formation. Two series of high-pressure coal combustion experiments were performed using SRI's pressurized radiant coal flow reactor. The first series of tests characterized the near burner flame zone (NBFZ). Three coals were tested, two high volatile bituminous (Pittsburgh No.8 and Illinois No.6), and one sub-bituminous (Powder River Basin), at pressures of 1, 2, and 3 MPa (10, 20, and 30 atm). The second series of experiments, which covered high-pressure burnout (HPBO) conditions, utilized a range of substantially longer combustion residence times to produce char burnout levels from 50% to 100%. The same three coals were tested at 1, 2, and 3 MPa, as well as at 0.2 MPa. Tests were also conducted on Pittsburgh No.8 coal in CO2 entrainment gas at 0.2, 1, and 2 MPa to begin establishing a database of experiments relevant to carbon sequestration techniques. The HPBO test series included use of an impactor-type particle sampler to measure the particle size distribution of fly ash produced under complete burnout conditions. The collected data have been interpreted with the help of CFD and detailed kinetics simulation to extend and validate devolatilization, char combustion and pollutant model at elevated pressure. A global NOX production sub-model has been proposed. The submodel reproduces the performance of the detailed chemical reaction mechanism for the NBFZ tests.

Stefano Orsino

2005-03-30T23:59:59.000Z

339

Terascale High-Fidelity Simulations of Turbulent Combustion with Detailed Chemistry: Spray Simulations  

SciTech Connect (OSTI)

The Terascale High-Fidelity Simulations of Turbulent Combustion (TSTC) project is a multi-university collaborative effort to develop a high-fidelity turbulent reacting flow simulation capability utilizing terascale, massively parallel computer technology. The main paradigm of the approach is direct numerical simulation (DNS) featuring the highest temporal and spatial accuracy, allowing quantitative observations of the fine-scale physics found in turbulent reacting flows as well as providing a useful tool for development of sub-models needed in device-level simulations. Under this component of the TSTC program the simulation code named S3D, developed and shared with coworkers at Sandia National Laboratories, has been enhanced with new numerical algorithms and physical models to provide predictive capabilities for turbulent liquid fuel spray dynamics. Major accomplishments include improved fundamental understanding of mixing and auto-ignition in multi-phase turbulent reactant mixtures and turbulent fuel injection spray jets.

Rutland, Christopher J.

2009-04-26T23:59:59.000Z

340

Contact Details of Local Forestry Commission and DARDNI Plant Health Inspectors at Points of Entry UK Principle Ports Inspector Contact Details  

E-Print Network [OSTI]

UK Principle Ports Inspector Contact Details Grangemouth, Greenock, Inverkeithing, Inverness, Leith, Barry, Port Talbot, Swansea, Neath, Newport, Bristol(Avonmouth), Sharpness Sid Martin Tel/Fax: 01792

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Progress in two major CCPI projects  

SciTech Connect (OSTI)

Two projects under the US Department of Energy (DOE) sponsored Clean Coal Power initiative have made significant progress in demonstrating new technologies to remove mercury from coal and enhance use of low-Btu lignite coals while increasing energy efficiency. The Wisconsin Electricity Power Company is demonstrating the TOXECON{trademark} mercury control process at its Presque Isle Power Plant near Marquette, Michigan, while Great River Energy (GRE) is showing the viability of lignite fuel enhancement at its Coal Creek Station in Underwood, North Dakota. Both projects were awarded in 2004 under Round I of the Clean Coal Power Initiative. Elsewhere in the program, six projects are in various phases of planning or operation. Plans for a third round under the CCPI were announced on May 23, 2007. 2 figs.

NONE

2007-07-01T23:59:59.000Z

342

Save Energy Now Assessments Results 2008 Detailed Report  

SciTech Connect (OSTI)

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy No

Wright, Anthony L [ORNL; Martin, Michaela A [ORNL; Nimbalkar, Sachin U [ORNL; Quinn, James [U.S. Department of Energy; Glatt, Ms. Sandy [DOE Industrial Technologies Program; Orthwein, Mr. Bill [U.S. Department of Energy

2010-09-01T23:59:59.000Z

343

TX-100 manufacturing final project report.  

SciTech Connect (OSTI)

This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.

Ashwill, Thomas D.; Berry, Derek S. (TPI Composites, Inc., Warren, RI)

2007-11-01T23:59:59.000Z

344

Hanford Environmental Dose Reconstruction Project Monthly Report  

SciTech Connect (OSTI)

The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics; agriculture; food habits; and environmental pathways and dose estimates. 3 figs.

Finch, S.M. (comp.)

1990-01-01T23:59:59.000Z

345

Electrochromic projection and writing device  

DOE Patents [OSTI]

A display and projection apparatus includes an electrochromic material and a photoconductive material deposited in tandem used in conjunction with a light filtering means for filtering light transmitted through the electrochromic material. When an electric field is applied across the electrochromic material and the photoconductive material, light that is incident onto the photoconductive material through the surface of the projection apparatus causes the photoconductive material to conduct current locally in proportion to the amount of light incident on the photoconductive material. The flow of current causes the underlying portions of the electrochromic material to switch from an opaque state to a clear or transmissive state, thereby allowing back-light to propagate through the electrochromic material to create a visible image on the surface of the projection apparatus. Reversal of the electric field causes the electrochromic material to revert back to its opaque state, thereby blocking the transmission of back-light and effectively erasing the image from the surface of the projection apparatus.

Branz, Howard M. (Boulder, CO); Benson, David K. (Golden, CO)

2002-01-01T23:59:59.000Z

346

SAPHIRE 8 Software Project Plan  

SciTech Connect (OSTI)

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: Incorporation of SPAR models for the SDP interface. Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. Continue the current activities for code maintenance, documentation, and user support for the code.

Curtis L.Smith; Ted S. Wood

2010-03-01T23:59:59.000Z

347

Small-scale hydroelectric power demonstration project: Broad River Electric Cooperative, Inc. , Cherokee Falls, South Carolina: Final operations and maintenance report  

SciTech Connect (OSTI)

The purpose of this report is to give a final accounting of the costs and benefits derived from the first two years of operation of the Cherokee Falls, Broad River Hydroelectric Demonstration Project which was built at Cherokee Falls, South Carolina. Prior to construction, Broad River Electric Cooperative, Inc. (BREC) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-80ID12125 which provided $1,052,664 toward the construction of the facility. This agreement requires that BREC document for DOE a summary of the complete operating statistics, operating and maintenance cost, and revenues from power sales for a two-year operating period. A complete reporting covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report''. For this reason these elements will not be addressed in detail in this report. In order to make this account a more meaningful discussion of the initial two-year and four month production period, it is necessary to detail several unique events concerning the project which set Cherokee Falls apart from other projects developed under similar Cooperative Agreements with DOE. Accordingly, this report will discuss certain major problems experienced with the design, operation and maintenance, energy production, as well as the operation and maintenance cost and value of the power produced for the first 28 months of operation. 3 figs.

Not Available

1988-08-01T23:59:59.000Z

348

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

349

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

350

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

351

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

352

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

353

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

354

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

355

TidGen Power System Commercialization Project  

SciTech Connect (OSTI)

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPCs tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

Sauer, Christopher R. [President & CEO] [President & CEO; McEntee, Jarlath [VP Engineering & CTO] [VP Engineering & CTO

2013-12-30T23:59:59.000Z

356

Co-Simulation of Detailed Whole Building with the Power System to Study Smart Grid Applications  

SciTech Connect (OSTI)

Modernization of the power system in a way that ensures a sustainable energy system is arguably one of the most pressing concerns of our time. Buildings are important components in the power system. First, they are the main consumers of electricity and secondly, they do not have constant energy demand. Conventionally, electricity has been difficult to store and should be consumed as it is generated. Therefore, maintaining the demand and supply is critical in the power system. However, to reduce the complexity of power models, buildings (i.e., end-use loads) are traditionally modeled and represented as aggregated dumb nodes in the power system. This means we lack effective detailed whole building energy models that can support requirements and emerging technologies of the smart power grid. To gain greater insight into the relationship between building energy demand and power system performance, it is important to constitute a co-simulation framework to support detailed building energy modeling and simulation within the power system to study capabilities promised by the modern power grid. This paper discusses ongoing work at Pacific Northwest National Laboratory and presents underlying tools and framework needed to enable co-simulation of building, building energy systems and their control in the power system to study applications such as demand response, grid-based HVAC control, and deployment of buildings for ancillary services. The optimal goal is to develop an integrated modeling and simulation platform that is flexible, reusable, and scalable. Results of this work will contribute to future building and power system studies, especially those related to the integrated smart grid. Results are also expected to advance power resiliency and local (micro) scale grid studies where several building and renewable energy systems transact energy directly. This paper also reviews some applications that can be supported and studied using the framework introduced to understand their implications before they can be successfully implemented in the power system.

Makhmalbaf, Atefe; Fuller, Jason C.; Srivastava, Viraj; Ciraci, Selim; Daily, Jeffrey A.

2014-12-24T23:59:59.000Z

357

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

358

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

359

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

360

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please emailWeatherizationInnovation@ee.doe.gov.

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

362

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

363

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

364

Technical Project Managers  

E-Print Network [OSTI]

been subjected to the Agency's peer and administrative review, and it has been approved for publication as an EPA document. Mention of trade names or commercial products does not constitute endorsement or recommendation for use. ii FOREWORD Waste Minimization (WM) is a policy that was specifically mandated by the US. Congress in the 1984 Hazardous and Solid Wastes AmehdmentS to the Resource Conservation and Recovery Act (RCRA). This mandate, coupled with other RCRA provisions that have led to unprecedented increases in the costs of waste management, have heightened general interest in WM. A strong contributing factor has been a desire on the part of generators to reduce their environmental impairment liabilities under the provisions of the Comprehensive Environmental Response, Compensation and Liabilities Act (CERCLA, or "Superfund"). Because of these increasing costs and liability exposure, WM has become more and more attractive economically. More recently (in early 1989), as part of ks effort to reduce the amount of wastes generated, EPA made source reduction and recycling top priorities for environmental research, development, and implementation projects sponsored by the Agency. EPAs Risk Reduction Engineering Laboratory (RREL) and Office of

Joseph W. Tillman; Anne Robertson; Emma Lou George

1991-01-01T23:59:59.000Z

365

Vehicle to Grid Demonstration Project  

SciTech Connect (OSTI)

This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

2010-12-31T23:59:59.000Z

366

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

367

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

368

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

369

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

370

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

371

Advanced exterior sensor project : final report, September 2004.  

SciTech Connect (OSTI)

This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

Ashby, M. Rodema

2004-12-01T23:59:59.000Z

372

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

373

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13 (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

374

Detailed Geophysical Fault Characterization in Yucca Flat, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Yucca Flat is a topographic and structural basin in the northeastern part of the Nevada Test Site (NTS) in Nye County, Nevada. Between the years 1951 and 1992, 659 underground nuclear tests took place in Yucca Flat; most were conducted in large, vertical excavations that penetrated alluvium and the underlying Cenozoic volcanic rocks. Radioactive and other potential chemical contaminants at the NTS are the subject of a long-term program of investigation and remediation by the U.S. Department of Energy (DOE), National Nuclear Security Administration, Nevada Site Office, under its Environmental Restoration Program. As part of the program, the DOE seeks to assess the extent of contamination and to evaluate the potential risks to humans and the environment from byproducts of weapons testing. To accomplish this objective, the DOE Environmental Restoration Program is constructing and calibrating a ground-water flow model to predict hydrologic flow in Yucca Flat as part of an effort to quantify the subsurface hydrology of the Nevada Test Site. A necessary part of calibrating and evaluating a model of the flow system is an understanding of the location and characteristics of faults that may influence ground-water flow. In addition, knowledge of fault-zone architecture and physical properties is a fundamental component of the containment of the contamination from underground nuclear tests, should such testing ever resume at the Nevada Test Site. The goal of the present investigation is to develop a detailed understanding of the geometry and physical properties of fault zones in Yucca Flat. This study was designed to investigate faults in greater detail and to characterize fault geometry, the presence of fault splays, and the fault-zone width. Integrated geological and geophysical studies have been designed and implemented to work toward this goal. This report describes the geophysical surveys conducted near two drill holes in Yucca Flat, the data analyses performed, and the integrated interpretations developed from the suite of geophysical methodologies utilized in this investigation. Data collection for this activity started in the spring of 2005 and continued into 2006. A suite of electrical geophysical surveys were run in combination with ground magnetic surveys; these surveys resulted in high-resolution subsurface data that portray subsurface fault geometry at the two sites and have identified structures not readily apparent from surface geologic mapping, potential field geophysical data, or surface effects fracture maps.

Theodore H. Asch; Donald Sweetkind; Bethany L. Burton; Erin L. Wallin

2009-02-10T23:59:59.000Z

375

Implications of the Human Genome Project  

SciTech Connect (OSTI)

The Human Genome Project (HGP), launched in 1991, aims to map and sequence the human genome by 2006. During the fifteen-year life of the project, it is projected that $3 billion in federal funds will be allocated to it. The ultimate aims of spending this money are to analyze the structure of human DNA, to identify all human genes, to recognize the functions of those genes, and to prepare for the biology and medicine of the twenty-first century. The following summary examines some of the implications of the program, concentrating on its scientific import and on the ethical and social problems that it raises. Its aim is to expose principles that might be used in applying the information which the HGP will generate. There is no attempt here to translate the principles into detailed proposals for legislation. Arguments and discussion can be found in the full report, but, like this summary, that report does not contain any legislative proposals.

Kitcher, P.

1998-11-01T23:59:59.000Z

376

Incorporation of Detailed Chemical Mechanisms in Reactive Flow Simulations Using Element-Flux Analysis  

E-Print Network [OSTI]

ignition (HCCI) combustion with detailed chemistry by using the proposed on-the-fly reduction scheme detailed characterizations of in-cylinder behaviors in stratified HCCI engines by incorporating detailed was proposed for HCCI engines in which homogeneous charge was used. However, although termed "homogeneous

Androulakis, Ioannis (Yannis)

377

Optimizing a physical security configuration using a highly detailed simulation model  

E-Print Network [OSTI]

Optimizing a physical security configuration using a highly detailed simulation model Marechal, T. Email: tommarechal@hotmail.com Abstract This chapter focuses on using a highly detailed simulation model. In this chapter describes the use of a highly detailed simulation model to find a superior security configuration

Smith, Alice E.

378

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

379

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

380

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

382

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

383

Results of detailed characterization on CH-TRU mixed waste at Argonne National Laboratory-West  

SciTech Connect (OSTI)

Argonne National Laboratory-West and Lockheed Idaho Technologies Company have jointly participated in the Department of Energy`s (DOE) Waste Isolation Pilot Plant Experimental Test Program since 1990. A new facility at Argonne was developed to improve the effectiveness and efficiency of contact-handled transuranic mixed waste characterization and to decrease the potential for facility contamination and personnel exposures. This new facility, the Waste Characterization Area, was approved for radioactive operations in March 1994. Between April and September 1994, forty-two waste drums containing mixed debris waste were characterized to support a study being performed to evaluate volatile organic compound concentrations in the void volume headspaces of waste drums. This paper presents the results of characterization performed at Argonne, emphasizing parameters important from a facility standpoint. Specifically, information is presented on drum surface dose rate, fissile content, number and type of gas samples, volatile organic compound concentration, and facility contamination levels. Actual values are compared to enveloping conditions assumed in the safety assessment for the characterization facility. Argonne-West is one of the first DOE sites to perform detailed waste characterization under the DOE`s Transuranic Waste Characterization Program. The information presented herein could aid other storage and generator sites in developing characterization procedures and facilities.

Dwight, C.C.; Jensen, B.A.; Duncan, D.S.

1995-03-01T23:59:59.000Z

384

Vandenberg Air Force Base integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect (OSTI)

The US Air Force Space Command has tasked the Pacific Northwest Laboratory, as the lead laboratory supporting the US Department of Energy Federal Energy Management Program, to identify, evaluate, and assist in acquiring all cost-effective energy projects at Vandenberg Air Force Base (VAFB). This is a model program PNL is designing for federal customers served by the Pacific Gas and Electric Company (PG and E). The primary goal of the VAFB project is to identify all electric energy efficiency opportunities, and to negotiate with PG and E to acquire those resources through a customized demand-side management program for its federal clients. That customized program should have three major characteristics: (1) 100% up-front financing; (2) substantial utility cost-sharing; and (3) utility implementation through energy service companies under contract to the utility. A similar arrangement will be pursued with Southern California Gas for non-electric resource opportunities if that is deemed desirable by the site and if the gas utility seems open to such an approach. This report documents the assessment of baseline energy use at VAFB located near Lompoc, California. It is a companion report to Volume 1, Executive Summary, and Volume 3, Resource Assessment. This analysis examines the characteristics of electric, natural gas, fuel oil, and propane use for fiscal year 1991. It records energy-use intensities for the facilities at VAFB by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A more complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, and applicable losses.

Halverson, M.A.; Richman, E.E.; Dagle, J.E.; Hickman, B.J.; Daellenbach, K.K.; Sullivan, G.P.

1993-06-01T23:59:59.000Z

385

DEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS  

E-Print Network [OSTI]

for the program is provided by the following agencies: Department of Energy, Mines and Resources (Canada) Deutsche&M University, as an account of work performed under the international Ocean Drilling Program which is managedDEEP SEA DRILLING PROJECT DATA FILE DOCUMENTS Ocean Drilling Program Texas A&M University Technical

386

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

387

Low Wind Speed Turbine Development Project Report: November 4, 2002 - December 31, 2006  

SciTech Connect (OSTI)

This report summarizes work conducted by Clipper Windpower under the DOE Low Wind Speed Turbine project. The objective of this project was to produce a wind turbine that can lower the cost of energy.

Mikhail, A.

2009-01-01T23:59:59.000Z

388

Eight Advanced Coal Projects Chosen for Further Development by DOE's University Coal Research Program  

Broader source: Energy.gov [DOE]

DOE has selected eight new projects to further advanced coal research under the University Coal Research Program. The selected projects will improve coal conversion and use and will help propel technologies for future advanced coal power systems.

389

Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline  

SciTech Connect (OSTI)

This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

Gelles, C. M.; Sheppard, F. R.

2002-02-26T23:59:59.000Z

390

ONE-PAGE BRIEF: Competitive Grant Report EP2007-30 Abstract: The project  

E-Print Network [OSTI]

ONE-PAGE BRIEF: Competitive Grant Report EP2007-30 Abstract: The project explored the effects Heritage Foundation More details: www.leopold.iastate.edu/ research/grants/2011-1/ EP2007-30.pdf #12;

Debinski, Diane M.

391

Extensions and enhancements to the iLab heat transfer project site  

E-Print Network [OSTI]

The iLab Heat Transfer Project website started four years ago to enable web access to experiments related to movement of heat through transport processes. This thesis details improvements made to the site which extend and ...

Saylor, David P. (David Patrick)

2005-01-01T23:59:59.000Z

392

Annual Energy Outlook 2011 with Projections to 2035  

SciTech Connect (OSTI)

The projections in the Energy Information Administration's (EIA) Annual Energy Outlook 2011 (AEO2011) focus on the factors that shape the U.S. energy system over the long term. Under the assumption that current laws and regulations remain unchanged throughout the projections, the AEO2011 Reference case provides the basis for examination and discussion of energy production, consumption, technology, and market trends and the direction they may take in the future. It also serves as a starting point for analysis of potential changes in energy policies. But AEO2011 is not limited to the Reference case. It also includes 57 sensitivity cases (see Appendix E, Table E1), which explore important areas of uncertainty for markets, technologies, and policies in the U.S. energy economy. Key results highlighted in AEO2011 include strong growth in shale gas production, growing use of natural gas and renewables in electric power generation, declining reliance on imported liquid fuels, and projected slow growth in energy-related carbon dioxide (CO2) emissions even in the absence of new policies designed to mitigate greenhouse gas (GHG) emissions. AEO2011 also includes in-depth discussions on topics of special interest that may affect the energy outlook. They include: impacts of the continuing renewal and updating of Federal and State laws and regulations; discussion of world oil supply and price trends shaped by changes in demand from countries outside the Organization for Economic Cooperation and Development or in supply available from the Organization of the Petroleum Exporting Countries; an examination of the potential impacts of proposed revisions to Corporate Average Fuel Economy standards for light-duty vehicles and proposed new standards for heavy-duty vehicles; the impact of a series of updates to appliance standard alone or in combination with revised building codes; the potential impact on natural gas and crude oil production of an expanded offshore resource base; prospects for shale gas; the impact of cost uncertainty on construction of new electric power plants; the economics of carbon capture and storage; and the possible impact of regulations on the electric power sector under consideration by the U.S. Environmental Protection Agency (EPA). Some of the highlights from those discussions are mentioned in this Executive Summary. Readers interested in more detailed analyses and discussions should refer to the 'Issues in focus' section of this report.

None

2011-04-01T23:59:59.000Z

393

EXPERIMENT DETAILS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for the Future of DOE Science WilliamEVDETAILS

394

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ? Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

395

DIGITAL ARCHITECTURE PROJECT PLAN  

SciTech Connect (OSTI)

The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

Thomas, Ken

2014-09-01T23:59:59.000Z

396

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

397

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

398

Projecting Electricity Demand in 2050  

SciTech Connect (OSTI)

This paper describes the development of end-use electricity projections and load curves that were developed for the Renewable Electricity (RE) Futures Study (hereafter RE Futures), which explored the prospect of higher percentages (30% ? 90%) of total electricity generation that could be supplied by renewable sources in the United States. As input to RE Futures, two projections of electricity demand were produced representing reasonable upper and lower bounds of electricity demand out to 2050. The electric sector models used in RE Futures required underlying load profiles, so RE Futures also produced load profile data in two formats: 8760 hourly data for the year 2050 for the GridView model, and in 2-year increments for 17 time slices as input to the Regional Energy Deployment System (ReEDS) model. The process for developing demand projections and load profiles involved three steps: discussion regarding the scenario approach and general assumptions, literature reviews to determine readily available data, and development of the demand curves and load profiles.

Hostick, Donna J.; Belzer, David B.; Hadley, Stanton W.; Markel, Tony; Marnay, Chris; Kintner-Meyer, Michael CW

2014-07-01T23:59:59.000Z

399

The Healy clean coal project: An overview  

SciTech Connect (OSTI)

The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

1997-12-31T23:59:59.000Z

400

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

402

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

403

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

404

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

405

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

406

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

407

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

408

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

409

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

410

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

411

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

412

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

413

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

414

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

415

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

416

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

417

A simulation environment for multiple project resource optimization  

E-Print Network [OSTI]

This thesis develops a numerical simulation environment as a management support tool applicable to the selection and scheduling of multiple, concurrent research and development projects under conditions of constrained ...

Sharkey, John Patrick, 1954-

2004-01-01T23:59:59.000Z

418

EIS-0289: JEA Circulating Fluidized Bed Combustor Project  

Broader source: Energy.gov [DOE]

This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the...

419

World Energy Projection System model documentation  

SciTech Connect (OSTI)

The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

Hutzler, M.J.; Anderson, A.T.

1997-09-01T23:59:59.000Z

420

LIFAC sorbent injection desulfurization demonstration project  

SciTech Connect (OSTI)

In December 1990, the US Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round 3). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled LIFAC Sorbent Injection Desulfurization Demonstration Project.'' The host site for this $17 million, three-phase project is Richmond Power and Light's Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75--80% of the sulfur dioxide (SO{sub 2}) in the flue gas. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the US DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the first Technical Progress Report covering the period from project execution through the end of December 1990. Due to the power plant's planned outage schedule, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

under construction Munger Graduate  

E-Print Network [OSTI]

Knight Management Center, under construction Munger Graduate Residences, under construction School 530550 610 570 560 CERAS Meyer Library School of Education Fire Truck Hse. Clock Tower Owen Bolivar House

Bogyo, Matthew

422

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

423

Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting  

SciTech Connect (OSTI)

Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

Not Available

1980-01-01T23:59:59.000Z

424

UMTRA Project Office Quality Assurance Program Plan. Revision 5  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

Not Available

1993-11-01T23:59:59.000Z

425

CALLA ENERGY BIOMASS COFIRING PROJECT  

SciTech Connect (OSTI)

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts focused on completion of the Topical Report, summarizing the design and techno-economic study of the project's feasibility. GTI received supplemental authorization A002 from DOE contracts for additional work to be performed under Phase I that will further extend the performance period until the end of February 2003. The additional scope of work is for GTI to develop the gasification characteristics of selected feedstock for the project. To conduct this work, GTI will assemble an existing ''mini-bench'' unit to perform the gasification tests. The results of the test will be used to confirm or if necessary update the process design completed in Phase Task 1.

Unknown

2002-09-30T23:59:59.000Z

426

CALLA ENERGY BIOMASS COFIRING PROJECT  

SciTech Connect (OSTI)

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts focused on completion of the Topical Report, summarizing the design and techno-economic study of the project's feasibility. GTI received supplemental authorization A002 from DOE contracts for additional work to be performed under Phase I that will further extend the performance period until the end of 2002. GTI worked with DOE to develop the Statement of Work for the supplemental activities. DOE granted an interim extension of the project until the end of January 2002 to complete the contract paperwork. GTI worked with Calla Energy to develop request for continued funding to proceed with Phase II, submitted to DOE on November 1, 2001.

Unknown

2001-12-31T23:59:59.000Z

427

CALLA ENERGY BIOMASS COFIRING PROJECT  

SciTech Connect (OSTI)

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts focused on completion of the Topical Report, summarizing the design and techno-economic study of the project's feasibility. GTI received supplemental authorization A002 from DOE contracts for additional work to be performed under Phase I that will further extend the performance period until the end of February 2003. The additional scope of work is for GTI to develop the gasification characteristics of selected feedstock for the project. To conduct this work, GTI will assemble an existing ''mini-bench'' unit to perform the gasification tests. The results of the test will be used to confirm or if necessary update the process design completed in Phase Task 1.

Unknown

2002-06-30T23:59:59.000Z

428

CALLA ENERGY BIOMASS COFIRING PROJECT  

SciTech Connect (OSTI)

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. During this Performance Period work efforts focused on completion of the Topical Report, summarizing the design and techno-economic study of the project's feasibility. GTI received supplemental authorization A002 from DOE contracts for additional work to be performed under Phase I that will further extend the performance period until the end of February 2003. The additional scope of work is for GTI to develop the gasification characteristics of selected feedstock for the project. To conduct this work, GTI will assemble an existing ''mini-bench'' unit to perform the gasification tests. The results of the test will be used to confirm or if necessary update the process design completed in Phase Task 1.

Unknown

2002-03-31T23:59:59.000Z

429

Project Gutenberg's The Foundations of Geometry, by David Hilbert  

E-Print Network [OSTI]

Project Gutenberg's The Foundations of Geometry, by David Hilbert This eBook is for the use of anyone anywhere at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www

Corry, Scott

430

EIS-0409: Kemper County Integrated Gasification Combined Cycle Project, Mississippi  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to provide funding for the Kemper County Integrated Gasification Combined Cycle Project in Kemper County, Mississippi to assess the potential environmental impacts associated with the construction and operation of a project proposed by Southern Power Company, through its affiliate Mississippi Power Company, which has been selected by DOE for consideration under the Clean Coal Power Initiative (CCPI) program.

431

NREL Energy Storage Projects: FY2013 Annual Report  

SciTech Connect (OSTI)

In FY13, DOE funded NREL to make technical contributions to various R&D activities. This report summarizes NREL's R&D projects in FY13 in support of the USABC; Battery Testing, Analysis, and Design; ABR; and BATT program elements. The FY13 projects under NREL's Energy Storage R&D program are discussed in depth in this report.

Pesaran, A.; Ban, C.; Brooker, A.; Gonder, J.; Ireland, J.; Keyser, M.; Kim, G. H.; Long, D.; Neubauer, J.; Santhanagopalan, S.; Smith, K.; Tenent, R.; Wood, E.; Han, T.; Hartridge, S.; Shaffer, C. E.

2014-07-01T23:59:59.000Z

432

Terascale High-Fidelity Simulations of Turbulent Combustion with Detailed Chemistry  

SciTech Connect (OSTI)

The TSTC project is a multi-university collaborative effort to develop a high-fidelity turbulent reacting flow simulation capability utilizing terascale, massively parallel computer technology. The main paradigm of our approach is direct numerical simulation (DNS) featuring highest temporal and spatial accuracy, allowing quantitative observations of the fine-scale physics found in turbulent reacting flows as well as providing a useful tool for development of sub-models needed in device-level simulations. The code named S3D, developed and shared with Chen and coworkers at Sandia National Laboratories, has been enhanced with new numerical algorithms and physical models to provide predictive capabilities for spray dynamics, combustion, and pollutant formation processes in turbulent combustion. Major accomplishments include improved characteristic boundary conditions, fundamental studies of auto-ignition in turbulent stratified reactant mixtures, flame-wall interaction, and turbulent flame extinction by water spray. The overarching scientific issue in our recent investigations is to characterize criticality phenomena (ignition/extinction) in turbulent combustion, thereby developing unified criteria to identify ignition and extinction conditions. The computational development under TSTC has enabled the recent large-scale 3D turbulent combustion simulations conducted at Sandia National Laboratories.

Im, Hong G [University of Michigan] [University of Michigan; Trouve, Arnaud [University of Maryland] [University of Maryland; Rutland, Christopher J [University of Wisconsin] [University of Wisconsin; Chen, Jacqueline H [Sandia National Laboratories] [Sandia National Laboratories

2012-08-13T23:59:59.000Z

433

Urban Options Solar Greenhouse Demonstration Project. Final report  

SciTech Connect (OSTI)

The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

Cipparone, L.

1980-10-15T23:59:59.000Z

434

Waste Description Type of Project Pounds Reduced, Reused,  

E-Print Network [OSTI]

Accelerator =1; National Synchrotron Light Source=1; Basic Energy Sciences=1) each handle 66 lbs. of hazardousWaste Description Type of Project Pounds Reduced, Reused, Recycled or Conserved in 2009 Waste Type Description Details * Alkaline batteries Recycling 200 Industrial waste $10 $0 $10 Two hundred pounds

435

Webinar: Guidance for Filling Out a Detailed H2A Production Case Study  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Guidance for Filling Out a Detailed H2A Production Case Study, originally presented on July 9, 2013.

436

River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1  

SciTech Connect (OSTI)

This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

Project Integration

2005-09-26T23:59:59.000Z

437

E-Print Network 3.0 - anatomically detailed mri-derived Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(e.g. grey matter). Small details Source: Duncan, James S. - Departments of Diagnostic Radiology & Electrical Engineering, Yale University Collection: Biology and Medicine Page:...

438

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

439

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z

440

The Home Microbiome Project  

ScienceCinema (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Broader source: Energy.gov [DOE]

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

442

NIST Mobility and Manipulation Project Needs and Plans The NIST Mobility and Manipulation (MM) Project is seeking government, industry  

E-Print Network [OSTI]

. The project testbed includes an industrial robot mounted on a linear rail. The MM Project also plans characterizing components of the new NIST robot testbed, which includes a six-axis industrial robot arm under that are of concern to industry. Real world applications are also highly beneficial for developing and evaluating

Perkins, Richard A.

443

Coastal Ohio Wind Project  

SciTech Connect (OSTI)

The Coastal Ohio Wind Project intends to address problems that impede deployment of wind turbines in the coastal and offshore regions of Northern Ohio. The project evaluates different wind turbine designs and the potential impact of offshore turbines on migratory and resident birds by developing multidisciplinary research, which involves wildlife biology, electrical and mechanical engineering, and geospatial science. Firstly, the project conducts cost and performance studies of two- and three-blade wind turbines using a turbine design suited for the Great Lakes. The numerical studies comprised an analysis and evaluation of the annual energy production of two- and three-blade wind turbines to determine the levelized cost of energy. This task also involved wind tunnel studies of model wind turbines to quantify the wake flow field of upwind and downwind wind turbine-tower arrangements. The experimental work included a study of a scaled model of an offshore wind turbine platform in a water tunnel. The levelized cost of energy work consisted of the development and application of a cost model to predict the cost of energy produced by a wind turbine system placed offshore. The analysis found that a floating two-blade wind turbine presents the most cost effective alternative for the Great Lakes. The load effects studies showed that the two-blade wind turbine model experiences less torque under all IEC Standard design load cases considered. Other load effects did not show this trend and depending on the design load cases, the two-bladed wind turbine showed higher or lower load effects. The experimental studies of the wake were conducted using smoke flow visualization and hot wire anemometry. Flow visualization studies showed that in the downwind turbine configuration the wake flow was insensitive to the presence of the blade and was very similar to that of the tower alone. On the other hand, in the upwind turbine configuration, increasing the rotor blade angle of attack reduced the wake size and enhanced the vortices in the flow downstream of the turbine-tower compared with the tower alone case. Mean and rms velocity distributions from hot wire anemometer data confirmed that in a downwind configuration, the wake of the tower dominates the flow, thus the flow fields of a tower alone and tower-turbine combinations are nearly the same. For the upwind configuration, the mean velocity shows a narrowing of the wake compared with the tower alone case. The downwind configuration wake persisted longer than that of an upwind configuration; however, it was not possible to quantify this difference because of the size limitation of the wind tunnel downstream of the test section. The water tunnel studies demonstrated that the scale model studies could be used to adequately produce accurate motions to model the motions of a wind turbine platform subject to large waves. It was found that the important factors that affect the platform is whether the platform is submerged or surface piercing. In the former, the loads on the platform will be relatively reduced whereas in the latter case, the structure pierces the wave free surface and gains stiffness and stability. The other important element that affects the movement of the platform is depth of the sea in which the wind turbine will be installed. Furthermore, the wildlife biology component evaluated migratory patterns by different monitoring systems consisting of marine radar, thermal IR camera and acoustic recorders. The types of radar used in the project are weather surveillance radar and marine radar. The weather surveillance radar (1988 Doppler), also known as Next Generation Radar (NEXRAD), provides a network of weather stations in the US. Data generated from this network were used to understand general migratory patterns, migratory stopover habitats, and other patterns caused by the effects of weather conditions. At a local scale our marine radar was used to complement the datasets from NEXRAD and to collect additional monitoring parameters such as passage rates, flight paths, flight directi

Gorsevski, Peter; Afjeh, Abdollah; Jamali, Mohsin; Bingman, Verner

2014-04-04T23:59:59.000Z

444

Preliminary assessment of potential CDM early start projects in Brazil  

SciTech Connect (OSTI)

The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential to be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest rate and with substantial guarantee. A few of the projects might go ahead without the benefit of CERs, but most probably would not. Whether the projected revenue from CERs would be sufficient to induce sponsors to proceed with the projects is an important issue that requires further investigation. All of the projects contribute to economic development in Brazil. The forestry projects in particular would create a significant number of rural jobs, and contribute income to rural communities. Some of the carbon sequestration projects would provide environmental benefits with respect to protection of biodiversity and soil.

Meyers, S.; Sathaye, J.; Lehman, B.; Schumacher, K.; van Vliet, O.; Moreira, J.R.

2000-11-01T23:59:59.000Z

445

Measuring Project Quality Factors Critical to Project Success  

E-Print Network [OSTI]

Measuring Project Quality ­ Factors Critical to Project Success Presented by Thomas Howe P available to measure and track project cost (cheap) and schedule (fast), the measurement and monitoring of project quality (good) is at best underdeveloped. While qualitative measures of project cost and schedule

Calgary, University of

446

Autoignition of toluene reference fuels at high pressures modeled with detailed chemical kinetics  

SciTech Connect (OSTI)

A detailed chemical kinetic model for the autoignition of toluene reference fuels (TRF) is presented. The toluene submechanism added to the Lawrence Livermore Primary Reference Fuel (PRF) mechanism was developed using recent shock tube autoignition delay time data under conditions relevant to HCCI combustion. For two-component fuels the model was validated against recent high-pressure shock tube autoignition delay time data for a mixture consisting of 35% n-heptane and 65% toluene by liquid volume. Important features of the autoignition of the mixture proved to be cross-acceleration effects, where hydroperoxy radicals produced during n-heptane oxidation dramatically increased the oxidation rate of toluene compared to the case when toluene alone was oxidized. Rate constants for the reaction of benzyl and hydroperoxyl radicals previously used in the modeling of the oxidation of toluene alone were untenably high for modeling of the mixture. To model both systems it was found necessary to use a lower rate and introduce an additional branching route in the reaction between benzyl radicals and O{sub 2}. Good agreement between experiments and predictions was found when the model was validated against shock tube autoignition delay data for gasoline surrogate fuels consisting of mixtures of 63-69% isooctane, 14-20% toluene, and 17% n-heptane by liquid volume. Cross reactions such as hydrogen abstractions between toluene and alkyl and alkylperoxy radicals and between the PRF were introduced for completion of chemical description. They were only of small importance for modeling autoignition delays from shock tube experiments, even at low temperatures. A single-zone engine model was used to evaluate how well the validated mechanism could capture autoignition behavior of toluene reference fuels in a homogeneous charge compression ignition (HCCI) engine. The model could qualitatively predict the experiments, except in the case with boosted intake pressure, where the initial temperature had to be increased significantly in order to predict the point of autoignition. (author)

Andrae, J.C.G. [Department of Chemical Engineering and Technology, Royal Institute of Technology, SE-100 44 Stockholm (Sweden); Shell Global Solutions, P.O. Box 1, Chester CH1 3SH (United Kingdom); Bjoernbom, P. [Department of Chemical Engineering and Technology, Royal Institute of Technology, SE-100 44 Stockholm (Sweden); Cracknell, R.F.; Kalghatgi, G.T. [Shell Global Solutions, P.O. Box 1, Chester CH1 3SH (United Kingdom)

2007-04-15T23:59:59.000Z

447

Detailed study of the nuclear dependence of the EMC effect and short-range correlations  

SciTech Connect (OSTI)

Background: The density of the nucleus has been important in explaining the nuclear dependence of the quark distributions, also known as the EMC effect, as well as the presence of high-momentum nucleons arising from short-range correlations (SRCs). Recent measurements of both of these effects on light nuclei have shown a clear deviation from simple density-dependent models. Purpose: A better understanding of the nuclear quark distributions and short-range correlations requires a careful examination of the experimental data on these effects to constrain models that attempt to describe these phenomena. Methods: We present a detailed analysis of the nuclear dependence of the EMC effect and the contribution of SRCs in nuclei, comparing to predictions and simple scaling models based on different pictures of the underlying physics. We also make a direct, quantitative comparison of the two effects to further examine the connection between these two observables related to nuclear structure. Results: We find that, with the inclusion of the new data on light nuclei, neither of these observables can be well explained by common assumptions for the nuclear dependence. The anomalous behavior of both effects in light nuclei is consistent with the idea that the EMC effect is driven by either the presence of high-density configurations in nuclei or the large virtuality of the high-momentum nucleons associated with these configurations. Conclusions: The unexpected nuclear dependence in the measurements of the EMC effect and SRC contributions appear to suggest that the local environment of the struck nucleon is the most relevant quantity for explaining these results. The common behavior suggests a connection between the two seemingly disparate phenomena, but the data do not yet allow for a clear preference between models which aim to explain this connection.

John Arrington, Aji Daniel, Donal Day, Nadia Fomin, David Gaskell, Patricia Solvignon

2012-12-01T23:59:59.000Z

448

Summary of Differences in Approach to Executing the NGNP Project  

SciTech Connect (OSTI)

The following discuss the summary differences between the NGNP Industry Alliances approach to execution of the NGNP Project as described in its Project Execution Strategy, and that included in the DOEs Report to Congress on the Next Generation Nuclear Plant dated April 2010. These summary differences are not a comprehensive description of the results of a detailed gap analysis, but rather are those differences that warrant discussion in meetings between DOE executives and the private sector represented by the Alliance. In practical fact, the full range and content of the differences will not be understood until such time as detailed discussions are engaged between the DOE and the Alliance to develop a mutually agreed-to project execution plan.

P.C. Hildebrandt

2010-08-01T23:59:59.000Z

449

Range-separated density-functional theory with random phase approximation: Detailed formalism and illustrative applications  

E-Print Network [OSTI]

Range-separated density-functional theory with random phase approximation: Detailed formalism-body theory, we present the details of a formally exact adiabatic-connection fluctuation-dissipation density-functional´an, Phys. Rev. Lett. 102, 096404 (2009). Range-separated density-functional theory approaches combining

Boyer, Edmond

450

New study details glacier ice loss following ice shelf July 25, 2011  

E-Print Network [OSTI]

and Ted #12;Scambos of the NSIDC produced detailed ice loss maps from 2001 to 2009 for the main tributaryNew study details glacier ice loss following ice shelf collapse July 25, 2011 Contact: Anthony Lane UMBC (410) 455-5793 alane@umbc.edu Katherine Leitzell National Snow and Ice Data Center University

Cambridge, University of

451

Topological Reconstruction of Complex 3D Buildings and Automatic Extraction of Levels of Detail  

E-Print Network [OSTI]

and outdoor topology of a detailed 3D building model from its geometry and to extract different levelsTopological Reconstruction of Complex 3D Buildings and Automatic Extraction of Levels of Detail A is needed for most of the applications using 3D building models after the architects design it. While

Boyer, Edmond

452

EconoGrid: A detailed Simulation Model of a Standards-based Grid Compute Economy  

E-Print Network [OSTI]

EconoGrid: A detailed Simulation Model of a Standards-based Grid Compute Economy EconoGrid is a detailed simulation model, implemented in SLX1 , of a grid compute economy that implements selected of users. In a grid compute economy, computing resources are sold to users in a market where price

453

Cyclic Testing of Concrete-Filled Circular Steel Bridge Piers having Encased Fixed-Based Detail  

E-Print Network [OSTI]

Cyclic Testing of Concrete-Filled Circular Steel Bridge Piers having Encased Fixed-Based Detail elements during earthquakes, this paper reports on cyclic inelastic tests executed to determine the maximum strength and ductility of four concrete-filled circular steel piers joined to a foundation detail proposed

Bruneau, Michel

454

Evaluation of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Populations  

E-Print Network [OSTI]

Evaluation of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Buster is a stochastic, spatially explicit simulation model of Aedes aegypti populations, designed of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Populations. PLoS ONE 6(7): e

Lloyd, Alun

455

High power couplers for Project X  

SciTech Connect (OSTI)

Project X, a multi-megawatt proton source under development at Fermi National Accelerator Laboratory. The key element of the project is a superconducting (SC) 3GV continuous wave (CW) proton linac. The linac includes 5 types of SC accelerating cavities of two frequencies.(325 and 650MHz) The cavities consume up to 30 kW average RF power and need proper main couplers. Requirements and approach to the coupler design are discussed in the report. New cost effective schemes are described. Results of electrodynamics and thermal simulations are presented.

Kazakov, S.; Champion, M.S.; Yakovlev, V.P.; Kramp, M.; Pronitchev, O.; Orlov, Y.; /Fermilab

2011-03-01T23:59:59.000Z

456

Project specific selection of decommissioning techniques  

SciTech Connect (OSTI)

Three decommissioning projects with quite different contamination characteristics were terminated with the requested result of freely released rooms for dismantled buildings under supervision of the responsible authorities. The examples show that control areas with different kinds of contamination and different equipment can be decommissioned with reasonable effort. The specific selection of decontamination methods and measurement techniques optimizes the performance of the project and lowers the amount of primary and secondary active waste. The careful planning of radiation protection measures ensures the safe work within the foreseen time schedule.

Christ, B.G.; Wehner, E.L. [NUKEM GmbH, Alzenau (Germany). Nuclear Technology Div.

1993-12-31T23:59:59.000Z

457

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network [OSTI]

a detailed cost estimate. F. PROJECT PLANNING GUIDE (PPG): This document is required for all State fundedCAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate

California at Santa Barbara, University of

458

Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series  

SciTech Connect (OSTI)

Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. This document provides a detailed description of each system component.

Baring-Gould, I.

2009-05-01T23:59:59.000Z

459

Department of Computer Science, University of Oxford Grade 06S Parttime Project Administrator  

E-Print Network [OSTI]

Department of Computer Science, University of Oxford Grade 06S Parttime Project Administrator Further Details This post is open to internal applicants only The Department of Computer Science, University of Oxford has a vacancy for a Parttime Project Administrator to support the work of Professor

Oxford, University of

460

Inspection of selected intelligence and special access program work-for-others projects  

SciTech Connect (OSTI)

At the request of the former Secretary, an inspection of six classified intelligence and special access program work-for-others projects was conducted. The purpose of this inspection was to evaluate managements, effectiveness regarding these work-for-others projects and included tests for financial integrity and adherence to applicable laws and regulations. Details of the inspection are provided in this report.

Not Available

1993-10-08T23:59:59.000Z

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

CROSS VALIDATION OF SATELLITE RADIATION TRANSFER MODELS DURING SWERA PROJECT IN BRAZIL  

E-Print Network [OSTI]

of the Solar and Wind Energy Resource Assessment (SWERA) project. SWERA is a multinational project financed by UNEP-GEF aimed at performing a detailed survey of solar and wind energy resources of various developing satellite data and climatological information; (2) SUNY-Albany model: a statistical satellite method based

Heinemann, Detlev

462

Using Critical Chain Project Management Methodologies to Build a Production Schedule  

E-Print Network [OSTI]

. It is the proper management of the essential project details across functions: materials, labor activities the proper management of materials and labor activities. Costs and activity durations were estimated usingUsing Critical Chain Project Management Methodologies to Build a Production Schedule By Clayton D

de Weck, Olivier L.

463

PROJECT BOEING SGS  

SciTech Connect (OSTI)

Boeing and its partner, PJM Interconnection, teamed to bring advanced defense-grade technologies for cyber security to the US regional power grid through demonstration in PJMs energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include: Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event Improved malware detection and zero-day threat response capability Improved ability to systematically evaluate and secure in house and vendor sourced software applications Improved ability to continuously monitor and maintain secure configuration of network devices resulting in reduced vulnerabilities for potential exploitation Improved overall cyber security situational awareness through the integration of multiple discrete security technologies into a single cyber security reporting console Improved ability to maintain the resiliency of critical systems in the face of a targeted cyber attack of other significant event Improved ability to model complex networks for penetration testing and advanced training of cyber security personnel

Bell, Thomas

2014-12-31T23:59:59.000Z

464

The human genome project  

SciTech Connect (OSTI)

The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

Bell, G.I.

1991-06-01T23:59:59.000Z

465

Projects | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProjectProjects Projects All 1703

466

NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)  

SciTech Connect (OSTI)

CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL, ORP, the Washington State Department of Ecology, and independent certified quality assurance an

MCLELLAN, G.W.

2007-02-07T23:59:59.000Z

467

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project  

E-Print Network [OSTI]

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project depending upon the scope, complexity, and specific features. Time periods indicated will vary depending on the nature of the project and needs of the user group

Mather, Patrick T.

468

July 28, 2013 Project Identification  

E-Print Network [OSTI]

://ernd.mosti.gov.my/eScience/Appli/frmApp_App_ProjId... 2 of 2 28/07/2013 14:10 #12;July 28, 2013 Project to expense codes).Only direct project expenses are funded by ScienceFund. Expense Category Year 1 (2010) YearJuly 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

469

July 28, 2013 Project Identification  

E-Print Network [OSTI]

.gov.my/eScience/Appli/frmApp_App_ProjId... 1 of 1 28/07/2013 14:12 #12;July 28, 2013 Project Cost project expenses are funded by ScienceFund. Expense Category Year 1 (2008) Year 2 (2009) Year 3 (2010July 28, 2013 Project Identification Project Identification Project Objectives Research Background

Bargiela, Andrzej

470

Energy Storage and Distributed Energy Generation Project, Final Project Report  

SciTech Connect (OSTI)

This report serves as a Final Report under the Energy Storage and Distribution Energy Generation Project carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nations grid. TECs research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.

Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

2008-03-31T23:59:59.000Z

471

State of Advancement of the International REVE Project: Computational Modelling of Irradiation-Induced Hardening in Reactor Pressure Vessel Steels and Relevant Experimental Validation Programme  

SciTech Connect (OSTI)

The REVE (Reactor for Virtual Experiments) project is an international joint effort aimed at developing multi-scale modelling computational toolboxes capable of simulating the behaviour of materials under irradiation at different time and length scales. Well grounded numerical techniques such as molecular dynamics (MD) and Monte Carlo (MC) algorithms, as well as rate equation (RE) and dislocation-defect interaction theory, form the basis on which the project is built. The goal is to put together a suite of integrated codes capable of deducing the changes in macroscopic properties starting from a detailed simulation of the microstructural changes produced by irradiation in materials. To achieve this objective, several European laboratories are closely collaborating, while exchanging data with American and Japanese laboratories currently pursuing similar approaches. The material chosen for the first phase of this project is reactor pressure vessel (RPV) steel, the target macroscopic magnitude to be predicted being the yield strength increase ({delta}{sigma}y) due, essentially, to irradiation-enhanced formation of intragranular solute atom precipitates or clouds, as well as irradiation induced defects in the matrix, such as point defect clusters and dislocation loops. A description of the methodological approach used in the project and its current state is given in the paper. The development of the simulation tools requires a continuous feedback from ad hoc experimental data. In the framework of the REVE project SCK EN has therefore performed a neutron irradiation campaign of model alloys of growing complexity (from pure Fe to binary and ternary systems and a real RPV steel) in the Belgian test reactor BR2 and is currently carrying on the subsequent materials characterisation using its hot cell facilities. The paper gives the details of this experimental programme - probably the first large-scale one devoted to the validation of numerical simulation tools - and presents and discusses the first available results, with a view to their use as feedback for the improvement of the computational modelling. (authors)

Malerba, Lorenzo; Van Walle, Eric [SCK.CEN, Boeretang 200, 2400 Mol (Belgium); Domain, Christophe; Jumel, Stephanie; Van Duysen, Jean-Claude [EDR R and D (France)

2002-07-01T23:59:59.000Z

472

Contract/Project Management  

Office of Environmental Management (EM)

Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and...

473

Contract/Project Management  

Energy Savers [EERE]

Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

474

Contract/Project Management  

Energy Savers [EERE]

in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

475

Contract/Project Management  

Energy Savers [EERE]

76% This is a 3-year rolling average Data includes FY06 to FY08. (3748) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM...

476

Offshore Wind Project Map  

Broader source: Energy.gov [DOE]

Image that shows the demonstration project site and developer headquarters for two funding opportunity announcements: the 2011 Grants for Technology Development and the 2011 Grants for Removing Market Barriers.

477

IT Project Manager  

Broader source: Energy.gov [DOE]

This position is located in the IT Project Management Office (JP). A successful candidate in this position will serve as an IT Program Manager and technical expert responsible for directly managing...

478

Healthcare Project Performance Benchmarks  

Broader source: Energy.gov [DOE]

Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the healthcare industry, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

479

Research Project Overview Introduction  

E-Print Network [OSTI]

Research Project Overview Introduction: 1.What is your topic? 2.What is your question? 3.What do Procedures: 6.What data do you need to test your hypothesis or meet your goal? 7. How do you plan to collect

480

RESEARCH PROJECTS February 13  

E-Print Network [OSTI]

will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration systems for heating and cooling in Mediterranean climate PROJECT REFERENCE: 218895 CALL: FP7-ENERGY-2007

Schenato, Luca

Note: This page contains sample records for the topic "detailed projections underlying" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

PROJECTION PURSUIT Jiayang Sun  

E-Print Network [OSTI]

PROJECTION PURSUIT Jiayang Sun Many data sets are high dimensional. It has been a common practice Friedman [7], Hall [11], Morton [21], Sun [23, 24], Cook et al. [2], Li and Cheng [19] and Roosen

Sun, Jiayang

482

Renewable energy projects approved  

Broader source: Energy.gov [DOE]

Two renewable energy projects representing a $100 million-plus investment by Las Vegas-based Nevada Power Co.a cost likely to be covered over time by the utility's customerswere approved Wednesday by state regulators.

483

Portsmouth Paducah Project Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

being returned to inventory for reuse or resale. As part of the project, cylinders of uranium hexafluoride (UF6) feed material were inspected and pre-sampled to determine Tc-99...

484

INTERNSHIPS SPECIAL PROJECTS  

E-Print Network [OSTI]

. The five academic programs within CAUSES ­ architecture, environmental science, health education, nursing%), architecture (24%), dietetics & nutrition science (20%), and environmental scientists (20%). These projections PUBLIC HEALTH ENVIRONMENTAL SCIENCE CAUSES invites you to apply for SUMMER SEMESTER INTERNSHIPS through

District of Columbia, University of the

485

St. Bernard Project Update  

Broader source: Energy.gov [DOE]

The folks at St. Bernard Project are helping survivors of Hurricane Katrina get back into their homes -- and are using new technologies to reduce energy and save money for the returning residents.

486

CALIFORNIA ENERGY Project Brochures  

E-Print Network [OSTI]

the integrated design, construction, and operation of building systems. The Integrated Energy SystemsCALIFORNIA ENERGY COMMISSION Project Brochures Integrated Energy Systems: Productivity and Building of a larger research effort called Integrated Energy Systems: Productivity and Building Science Program

487

Navajo Electrification Demonstraiton Project  

SciTech Connect (OSTI)

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

488

Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) established the Portsmouth/Paducah Project Office (PPPO) on October 1, 2003, to provide focused leadership to the Environmental Management missions at the Portsmouth...

489

The Mississippi CCS Project  

SciTech Connect (OSTI)

The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

Doug Cathro

2010-09-30T23:59:59.000Z

490

The OSER project  

E-Print Network [OSTI]

The OSER project (Optical Scintillation by Extraterrestrial Refractors) is proposed to search for scintillation of extragalactic sources through the galactic -- disk or halo -- transparent $\\mathrm{H\\_2}$ clouds, the last unknown baryonic structures. This project should allow one to detect column density stochastic variations in cool Galactic molecular clouds of order of $\\sim 3\\times 10^{-5} \\mathrm{g/cm^2}$ per $\\sim 10 000 \\mathrm{km}$ transverse distance.

Marc Moniez

2005-11-07T23:59:59.000Z

491

Black Pine Circle Project  

SciTech Connect (OSTI)

A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

Mytko, Christine

2014-03-31T23:59:59.000Z

492

Black Pine Circle Project  

ScienceCinema (OSTI)

A group of seventh graders from Black Pine Circle school in Berkeley had the opportunity to experience the Advanced Light Source (ALS) as "users" via a collaborative field trip and proposal project. The project culminated with a field trip to the ALS for all seventh graders, which included a visit to the ALS data visualization room, a diffraction demonstration, a beamline tour, and informative sessions about x-rays and tomography presented by ALS scientists.

Mytko, Christine

2014-09-15T23:59:59.000Z

493

NNSA project receives DOE Secretary's Award for Project Management...  

National Nuclear Security Administration (NNSA)

project receives DOE Secretary's Award for Project Management Improvement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

494

Y-12 Steam Plant Project Received National Recognition for Project...  

National Nuclear Security Administration (NNSA)

Steam Plant Project Received National Recognition for Project Management Excellence | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

495

Collaborative Research: Robust Climate Projections and Stochastic Stability of Dynamical Systems  

SciTech Connect (OSTI)

The project was completed along the lines of the original proposal, with additional elements arising as new results were obtained. The originally proposed three thrusts were expanded to include an additional, fourth one. (i) The e#11;ffects of stochastic perturbations on climate models have been examined at the fundamental level by using the theory of deterministic and random dynamical systems, in both #12;nite and in#12;nite dimensions. (ii) The theoretical results have been implemented #12;first on a delay-diff#11;erential equation (DDE) model of the El-Nino/Southern-Oscillation (ENSO) phenomenon. (iii) More detailed, physical aspects of model robustness have been considered, as proposed, within the stripped-down ICTP-AGCM (formerly SPEEDY) climate model. This aspect of the research has been complemented by both observational and intermediate-model aspects of mid-latitude and tropical climate. (iv) An additional thrust of the research relied on new and unexpected results of (i) and involved reduced-modeling strategies and associated prediction aspects have been tested within the team's empirical model reduction (EMR) framework. Finally, more detailed, physical aspects have been considered within the stripped-down SPEEDY climate model. The results of each of these four complementary e#11;fforts are presented in the next four sections, organized by topic and by the team members concentrating on the topic under discussion.

Ghil, Michael; McWilliams, James; Neelin, J. David; Zaliapin, Ilya; Chekroun, Mickael; Kondrashov, Dmitri; Simonnet, Eric

2011-10-13T23:59:59.000Z

496

Integrated Assessment Modeling of Carbon Sequestration and Land Use Emissions Using Detailed Model Results and Observations  

SciTech Connect (OSTI)

This report outlines the progress on the development and application of Integrated Assessment Modeling of Carbon Sequestrations and Land Use Emissions supported by the DOE Office of Biological and Environmental Research (OBER), U.S. Department of Energy, Grant No. DOE-DE-FG02-01ER63069. The overall objective of this collaborative project between the University of Illinois at Urbana-Champaign (UIUC), Oak Ridge National Laboratory (ORNL), Lawrence Livermore National Laboratory (LLNL), and Pacific Northwest National Laboratory (PNNL) was to unite the latest advances in carbon cycle research with scientifically based models and policy-related integrated assessment tools that incorporate computationally efficient representations of the latest knowledge concerning science and emission trajectories, and their policy implications. As part of this research we accomplished the following tasks that we originally proposed: (1) In coordination with LLNL and ORNL, we enhanced the Integrated Science Assessment Model's (ISAM) parametric representation of the ocean and terrestrial carbon cycles that better represent spatial and seasonal variations, which are important to study the mechanisms that influence carbon sequestration in the ocean and terrestrial ecosystems; (2) Using the MiniCAM modeling capability, we revised the SRES (IPCC Special Report on Emission Scenarios; IPCC, 2000) land use emission scenarios; and (3) On the application front, the enhanced version of ISAM modeling capability is applied to understand how short- and long-term natural carbon fluxes, carbon sequestration, and human emissions contribute to the net global emissions (concentrations) trajectories required to reach various concentration (emission) targets. Under this grant, 21 research publications were produced. In addition, this grant supported a number of graduate and undergraduate students whose fundamental research was to learn a disciplinary field in climate change (e.g., ecological dynamics and ocean circulations) and then complete research on how this field could be linked to the other factors we need to consider in its dynamics (e.g., land use, ocean and terrestrial carbon sequestration and climate change).

Dr. Atul Jain

2005-04-17T23:59:59.000Z

497

Uncompahgre Mesas Forest Restoration Project  

E-Print Network [OSTI]

March 2010 Uncompahgre Mesas Forest Restoration Project Collaboration Case Study #12;Uncompahgre Mesas Forest Restoration Project 1 1 Colorado Forest Restoration Institute Collaboration Case Study: Uncompahgre Mesas Forest Restoration Project Corrie Knapp Prepared for the Colorado Forest Restoration

498

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

499

CALLA ENERGY BIOMASS COFIRING PROJECT  

SciTech Connect (OSTI)

The Calla Energy Biomass Project, to be located in Estill County, Kentucky is to be conducted in two phases. The objective of Phase I is to evaluate the technical and economic feasibility of cofiring biomass-based gasification fuel-gas in a power generation boiler. Waste coal fines are to be evaluated as the cofired fuel. The project is based on the use of commercially available technology for feeding and gas cleanup that would be suitable for deployment in municipal, large industrial and utility applications. Define a combustion system for the biomass gasification-based fuel-gas capable of stable, low-NOx combustion over the full range of gaseous fuel mixtures, with low carbon monoxide emissions and turndown capabilities suitable for large-scale power generation applications. The objective for Phase II is to design, install and demonstrate the combined gasification and combustion system in a large-scale, long-term cofiring operation to promote acceptance and utilization of indirect biomass cofiring technology for large-scale power generation applications. GTI received supplemental authorization A002 from DOE for additional work to be performed under Phase I that will further extend the performance period until the end of February 2003. The additional scope of work is for GTI to develop the gasification characteristics of selected feedstock for the project. To conduct this work, GTI assembles an existing ''mini-bench'' unit to perform the gasification tests. The results of the test will be used to confirm or if necessary update the process design completed in Phase Task 1. During this Performance Period work efforts focused on conducting tests of biomass feedstock samples on the 2 inch mini-bench gasifier.

Unknown

2002-12-31T23:59:59.000Z

500

Governance of the International Linear Collider Project  

SciTech Connect (OSTI)

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

Foster, B.; /Oxford U.; Barish, B.; /Caltech; Delahaye, J.P.; /CERN; Dosselli, U.; /INFN, Padua; Elsen, E.; /DESY; Harrison, M.; /Brookhaven; Mnich, J.; /DESY; Paterson, J.M.; /SLAC; Richard, F.; /Orsay, LAL; Stapnes, S.; /CERN; Suzuki, A.; /KEK, Tsukuba; Wormser, G.; /Orsay, LAL; Yamada, S.; /KEK, Tsukuba

2012-05-31T23:59:59.000Z