Powered by Deep Web Technologies
Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Detailed Planning Kicks Off | OpenEI Community  

Open Energy Info (EERE)

Detailed Planning Kicks Off Detailed Planning Kicks Off Home > Groups > Linked Open Data Workshop in Washington, D.C. Jweers's picture Submitted by Jweers(83) Contributor 27 September, 2012 - 06:53 planning Skype call this morning to discuss details. More info coming soon! Groups: Linked Open Data Workshop in Washington, D.C. Login to post comments Jweers's blog Latest blog posts Jweers Event Planning Page Updated! Posted: 27 Sep 2012 - 18:38 by Jweers Jweers Added Public Promotional Page! Posted: 27 Sep 2012 - 18:10 by Jweers 1 of 2 ›› Groups Menu You must login in order to post into this group. Latest blog post comments No comments have been made yet Recent content LOD Workshop Invitation LOD Workshop Invitation Event Planning Page Updated! Added Public Promotional Page! Notes from the Call

2

OUTLINE OF DETAILED TEST PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0/ 177 0/ 177 Implementation Plan and Initial Development of Nuclear Concrete Materials Database for Light Water Reactor Sustainability Program September 30, 2010 Prepared by Weiju Ren and Dan Naus Oak Ridge National Laboratory Barry Oland XCEL Engineering DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source. National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone 703-605-6000 (1-800-553-6847) TDD 703-487-4639 Fax 703-605-6900 E-mail info@ntis.gov

3

RMR CRSP Capital Investment Plan FY12-FY21 Detail  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan FY12-FY21 Detail Yellow Highlight New Project to list W Total Western Only Costs Red Text Change from previous version O Total Trust and Joint Participation...

4

Memorandum: FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off"  

Energy.gov (U.S. Department of Energy (DOE))

From: Teresa Tyborowski, Acting Deputy Assistant Secretary for Program Planning & Budget (EM-60) Subject: Fiscal Years 2014 through 2018 Initial Budget Formulation "Kick-Off"

5

CRSP South Capital Investment Plan FY12-FY21 Detail  

NLE Websites -- All DOE Office Websites (Extended Search)

9/2011 9/2011 CRSP South Capital Investment Plan FY12-FY21 Detail Yellow Highlight = New Project to list W Total = Western Only Costs Red Text = Change from previous version O Total = Trust and Joint Participation Costs Blue Text = will be removed from list FY Total = Sum of W Total and O Total Green Highlight = Annual Equipment Replacement Programs MPS Split = Multiple Power System Cost Split. Fund PROJECT PROJECT Power Sys TOTAL W Total W PD W Non-PD O Total FY TOTAL W Total W PD W Non-PD O Total FY TOTAL Transmission Lines Environmental Support for Lands, Access Roads, and ROW's CRSPVMF 450 110 10 100 110 110 10 100 110 Lidar Closeout at Pinnacle Peak and Rogers CRSPVMF 15 15 15 15 Pinnacle Peak-Rogers ROW Agreement CRSPVMF 6,100 6,100 100 6,000 6,100 T-Line SubTotal 6,565 125 25 100 125 6,210 110

6

PROJECT MANGEMENT PLAN EXAMPLES Prepare Detailed Work Packages...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Packages Examples Example 71 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical...

7

ALS@20 Kick-Off Celebration  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS@20 ALS@20 Kick-Off Celebration ALS@20 Kick-Off Celebration Print On Friday, January 11, the Advanced Light Source celebrated the beginning of its 20th anniversary year with a...

8

Secretaries Bodman & Johanns Kick Off Renewable Energy Conference...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman & Johanns Kick Off Renewable Energy Conference with 17.5 Million for Biofuels Research & Development Grants Secretaries Bodman & Johanns Kick Off Renewable Energy...

9

Planning and initiation of detailed engineering design for the Great Plains coal gasification project. Final report  

Science Conference Proceedings (OSTI)

During the course of detailed engineering it was expected that preliminary engineering documents would need to be modified. In a number of instances, however, especially for flow diagrams and specifications, the revised preliminary engineering documents became the final approved for construction (AFC) documents. P and ID's and plot plans were updated as a result of the detailed piping design. Equipment data sheets which initially contained basic process data were made mechanically complete and then further updated to reflect the equipment actually purchased. The initial issue of the preliminary engineering documents represent a necessary baseline for monitoring project design changes. Foundation work, equipment specifications and status of engineering in the various process operations are discussed.

Not Available

1980-01-01T23:59:59.000Z

10

Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in Energy Technology Are "Winning the Future" Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in Energy Technology Are "Winning the Future" February 28, 2011 - 9:38am Addthis Dr. Arun Majumdar Dr. Arun Majumdar Former Director, Advanced Research Projects Agency - Energy President Obama has recently been talking about his plan to "Win the Future." Whether it's taking steps to reform our education system, rebuilding our infrastructure, or encouraging breakthroughs in technology, the phrase is about marshaling the country's best and brightest to solve today's problems. As the President put it, "To win the future, we have to out-innovate, out-educate and out-build the rest of the world, tapping

11

Getting a kick out of numerical relativity  

E-Print Network (OSTI)

Recent developments in numerical relativity have made it possible to follow reliably the coalescence of two black holes from near the innermost stable circular orbit to final ringdown. This opens up a wide variety of exciting astrophysical applications of these simulations. Chief among these is the net kick received when two unequal mass or spinning black holes merge. The magnitude of this kick has bearing on the production and growth of supermassive black holes during the epoch of structure formation, and on the retention of black holes in stellar clusters. Here we report the first accurate numerical calculation of this kick, for two nonspinning black holes in a 1.5:1 mass ratio, which is expected based on analytic considerations to give a significant fraction of the maximum possible recoil. We have performed multiple runs with different initial separations, orbital angular momenta, resolutions, extraction radii, and gauges. The full range of our kick speeds is 86--116 km s$^{-1}$, and the most reliable runs give kicks between 86 and 97 km s$^{-1}$. This is intermediate between the estimates from two recent post-Newtonian analyses and suggests that at redshifts $z\\gtrsim 10$, halos with masses $\\lesssim 10^9 M_\\odot$ will have difficulty retaining coalesced black holes after major mergers.

John G. Baker; Joan Centrella; Dae-Il Choi; Michael Koppitz; James R. van Meter; M. Coleman Miller

2006-03-08T23:59:59.000Z

12

Fuel Cell Technologies Office: Catalysis Working Group Kick-Off...  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalysis Working Group Kick-Off Meeting: May 2012 to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group Kick-Off Meeting: May 2012 on Facebook Tweet...

13

Vadose zone transport field study: Detailed test plan for simulated leak tests  

Science Conference Proceedings (OSTI)

The US Department of Energy (DOE) Groundwater/Vadose Zone Integration Project Science and Technology initiative was created in FY 1999 to reduce the uncertainty associated with vadose zone transport processes beneath waste sites at DOE's Hanford Site near Richland, Washington. This information is needed not only to evaluate the risks from transport, but also to support the adoption of measures for minimizing impacts to the groundwater and surrounding environment. The principal uncertainties in vadose zone transport are the current distribution of source contaminants and the natural heterogeneity of the soil in which the contaminants reside. Oversimplified conceptual models resulting from these uncertainties and limited use of hydrologic characterization and monitoring technologies have hampered the understanding contaminant migration through Hanford's vadose zone. Essential prerequisites for reducing vadose transport uncertainly include the development of accurate conceptual models and the development or adoption of monitoring techniques capable of delineating the current distributions of source contaminants and characterizing natural site heterogeneity. The Vadose Zone Transport Field Study (VZTFS) was conceived as part of the initiative to address the major uncertainties confronting vadose zone fate and transport predictions at the Hanford Site and to overcome the limitations of previous characterization attempts. Pacific Northwest National Laboratory (PNNL) is managing the VZTFS for DOE. The VZTFS will conduct field investigations that will improve the understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. Ideally, these methods will capture the extent of contaminant plumes using existing infrastructure (i.e., more than 1,300 steel-cased boreholes). The objectives of the VZTFS are to conduct controlled transport experiments at well-instrumented field sites at Hanford to: identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project.

AL Ward; GW Gee

2000-06-23T23:59:59.000Z

14

Kicked rotor quantum resonances in position space  

E-Print Network (OSTI)

We present an approach of the kicked rotor quantum resonances in position-space, based on its analogy with the optical Talbot effect. This approach leads to a very simple picture of the physical mechanism underlying the dynamics and to analytical expressions for relevant physical quantities, such as mean momentum or kinetic energy. The ballistic behavior, which is closely associated to quantum resonances, is analyzed and shown to emerge from a coherent adding of successive kicks applied to the rotor thanks to a periodic reconstruction of the spatial wavepacket.

Maxence Lepers; Vronique Zehnl; Jean Claude Garreau

2007-11-11T23:59:59.000Z

15

Kicked rotor quantum resonances in position space  

E-Print Network (OSTI)

We present an approach of the kicked rotor quantum resonances in position-space, based on its analogy with the optical Talbot effect. This approach leads to a very simple picture of the physical mechanism underlying the dynamics and to analytical expressions for relevant physical quantities, such as mean momentum or kinetic energy. The ballistic behavior, which is closely associated to quantum resonances, is analyzed and shown to emerge from a coherent adding of successive kicks applied to the rotor thanks to a periodic reconstruction of the spatial wavepacket.

Lepers, Maxence; Garreau, Jean Claude

2007-01-01T23:59:59.000Z

16

Accelerator dynamics of a fractional kicked rotor  

E-Print Network (OSTI)

It is shown that the Weyl fractional derivative can quantize an open system. A fractional kicked rotor is studied in the framework of the fractional Schrodinger equation. The system is described by the non-Hermitian Hamiltonian by virtue of the Weyl fractional derivative. Violation of space symmetry leads to acceleration of the orbital momentum. Quantum localization saturates this acceleration, such that the average value of the orbital momentum can be a direct current and the system behaves like a ratchet. The classical counterpart is a nonlinear kicked rotor with absorbing boundary conditions.

A. Iomin

2006-09-14T23:59:59.000Z

17

Kicked-Harper model vs On-Resonance Double Kicked Rotor Model: From Spectral Difference to Topological Equivalence  

E-Print Network (OSTI)

Recent studies have established that, in addition to the well-known kicked Harper model (KHM), an on-resonance double kicked rotor model (ORDKR) also has Hofstadter's butterfly Floquet spectrum, with strong resemblance to the standard Hofstadter's spectrum that is a paradigm in studies of the integer quantum Hall effect. Earlier it was shown that these quasi-energy spectra of the two dynamical models can (i) exactly overlap with each other if an effective Planck constant takes irrational multiples of $2\\pi$ and (ii) will be different if the same parameter takes rational multiples of $2\\pi$. This work makes some detailed comparison between these two models, with an effective Planck constant given by $2\\pi M/N$, where $M$ and $N$ are coprime integers. It is found that for odd $M$ and $N$, the ORDKR spectrum has one flat band and $N-1$ non-flat bands whose widths decay in power law as $\\sim K^{N+2}$, where $K$ is a kicking strength parameter. The existence of a flat band is strictly proved and the power law scaling, numerically checked for a number of cases, is also analytically proved for a three-band case. By contrast, the KHM does not have any flat band and their band width scales linearly with $K$. This is shown to result in dramatic differences in their dynamical behavior, such as transient (but extremely long) dynamical localization in ORDKR. Finally, we show that despite these differences, from a topological point of view, KHM and ORDRK are actually topologically equivalent. A theoretical derivation of this topological equivalence is provided.

Hailong Wang; Derek Y. H. Ho; Wayne Lawton; Jiao Wang; Jiangbin Gong

2013-06-26T23:59:59.000Z

18

Getting a kick out of numerical relativity  

E-Print Network (OSTI)

Recent developments in numerical relativity have made it possible to follow reliably the coalescence of two black holes from near the innermost stable circular orbit to final ringdown. This opens up a wide variety of exciting astrophysical applications of these simulations. Chief among these is the net kick received when two unequal mass or spinning black holes merge. The magnitude of this kick has bearing on the production and growth of supermassive black holes during the epoch of structure formation, and on the retention of black holes in stellar clusters. Here we report the first accurate numerical calculation of this kick, for two nonspinning black holes in a 1.5:1 mass ratio, which is expected based on analytic considerations to give a significant fraction of the maximum possible recoil. Our estimated kick is 105 km/s with an error of less than 10%. This is intermediate between the estimates from two recent post-Newtonian analyses and suggests that at redshifts z > 10, halos with masses < 10^9 M_sun w...

Baker, J G; Choi, D I; Koppitz, M; Miller, M C; Van Meter, J R; Baker, John G.; Centrella, Joan; Choi, Dae-Il; Koppitz, Michael; Meter, James R. van

2006-01-01T23:59:59.000Z

19

Periodically kicked hard oscillators G. A. Cecchi  

E-Print Network (OSTI)

Periodically kicked hard oscillators G. A. Cecchi Departamento de Fisica, U.N.L.P.,Argentina D. L for publication 25 November 1992) A model of a hard oscillator with analytic solution is presented. Its behavior forcing, and is intrinsic to hard oscillators; it is characterized by discontinuous circle maps

Magnasco, Marcelo Osvaldo

20

On the Spectrum of the Resonant Quantum Kicked Rotor  

E-Print Network (OSTI)

It is proven that none of the bands in the quasi-energy spectrum of the Quantum Kicked Rotor is flat at any primitive resonance of any order. Perturbative estimates of bandwidths at small kick strength are established for the case of primitive resonances of prime order. Different bands scale with different powers of the kick strength, due to degeneracies in the spectrum of the free rotor.

Italo Guarneri

2009-02-23T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

On the Spectrum of the Resonant Quantum Kicked Rotor  

E-Print Network (OSTI)

It is proven that none of the bands in the quasi-energy spectrum of the Quantum Kicked Rotor is flat at any primitive resonance of any order. Perturbative estimates of bandwidths at small kick strength are established for the case of primitive resonances of prime order. Different bands scale with different powers of the kick strength, due to degeneracies in the spectrum of the free rotor.

Guarneri, Italo

2009-01-01T23:59:59.000Z

22

Fidelity of the near resonant quantum kicked rotor  

E-Print Network (OSTI)

We present a perturbative result for the temporal evolution of the fidelity of the quantum kicked rotor, i.e. the overlap of the same initial state evolved with two slightly different kicking strengths, for kicking periods close to a principal quantum resonance. Based on a pendulum approximation we describe the fidelity for rotational orbits in the pseudo-classical phase space of a corresponding classical map. Our results are compared to numerical simulations indicating the range of applicability of our analytical approximation.

Benedikt Probst; Remy Dubertrand; Sandro Wimberger

2011-04-14T23:59:59.000Z

23

NREL: Wind Research - DOE Kicks Off Inaugural Collegiate Wind...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology Technology Transfer Technology Deployment Energy Systems Integration Wind Research Search More Search Options Site Map Printable Version DOE Kicks Off Inaugural...

24

Energy Secretary Bodman Kicks Off "Energizing America for Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home" Energy Secretary Bodman Kicks Off "Energizing America for Energy Security"...

25

Underwater kicking following the freestyle tumble-turn.  

E-Print Network (OSTI)

??Swim turns are a component of competitive swimming where considerable advantage can be gained or lost. This thesis investigates underwater dolphin and flutter kicking techniques (more)

Clothier, Peter

2004-01-01T23:59:59.000Z

26

Spectral Relationships Between Kicked Harper and On-Resonance Double Kicked Rotor Operators  

E-Print Network (OSTI)

Kicked Harper operators and on-resonance double kicked rotor operators model quantum systems whose semiclassical limits exhibit chaotic dynamics. Recent computational studies indicate a striking resemblance between the spectrums of these operators. In this paper we apply C*-algebra methods to explain this resemblance. We show that each pair of corresponding operators belong to a common rotation C*-algebra B_\\alpha, prove that their spectrums are equal if \\alpha is irrational, and prove that the Hausdorff distance between their spectrums converges to zero as q increases if \\alpha = p/q with p and q coprime integers. Moreover, we show that corresponding operators in B_\\alpha are homomorphic images of mother operators in the universal rotation C*-algebra A_\\alpha that are unitarily equivalent and hence have identical spectrums. These results extend analogous results for almost Mathieu operators. We also utilize the C*-algebraic framework to develop efficient algorithms to compute the spectrums of these mother operators for rational \\alpha and present preliminary numerical results that support the conjecture that their spectrums are Cantor sets if \\alpha is irrational. This conjecture for almost Mathieu operators, called the Ten Martini Problem, was recently proved after intensive efforts over several decades. This proof for the almost Mathieu operators utilized transfer matrix methods, which do not exist for the kicked operators. We outline a strategy, based on a special property of loop groups of semisimple Lie groups, to prove this conjecture for the kicked operators.

Wayne Lawton; Anders S. Mouritzen; Jiao Wang; Jiangbin Gong

2008-07-27T23:59:59.000Z

27

Quantum diffusion in the quasiperiodic kicked rotor  

E-Print Network (OSTI)

We study the mechanisms responsible for quantum diffusion in the quasiperiodic kicked rotor. We report experimental measurements of the diffusion constant on the atomic version of the system and develop a theoretical approach (based on the Floquet theorem) explaining the observations, especially the ``sub-Fourier'' character of the resonances observed in the vicinity of exact periodicity, i.e. the ability of the system to distinguish two neighboring driving frequencies in a time shorter than the inverse of the difference of the two frequencies.

Hans Lignier; Jean Claude Garreau; Pascal Szriftgiser; Dominique Delande

2004-12-02T23:59:59.000Z

28

EV Everywhere Grand Challenge Kick-Off  

NLE Websites -- All DOE Office Websites (Extended Search)

EV Everywhere Grand Challenge Kick-Off Thursday, June 21, 2012 - Hyatt Regency, Dearborn, MI Event Objective: To showcase existing DOE efforts in vehicle electrification and to obtain stakeholder input on the overall concept of the EV Everywhere Grand Challenge, the high-level strategy, and aggressive next-generation technology development necessary to enable U.S. companies to be the first in the world to produce plug-in electric vehicles (PEVs) that are as affordable and convenient for the average American family as today's gasoline-powered vehicles within the next 10 years. 8:30-8:35 AM CALL TO ORDER Mr. Patrick Davis, DOE EERE Vehicle Technologies Program 8:35-8:45 AM STRATEGIC SIGNIFICANCE OF PLUG-IN ELECTRIC VEHICLES

29

EV Everywhere Challenge Kick-Off  

NLE Websites -- All DOE Office Websites (Extended Search)

EV Everywhere Challenge Kick-Off Patrick Davis, Vehicle Technologies Program Manager Jacob Ward, Vehicle Technologies Senior Analyst June 21, 2012 Hyatt Regency, Dearborn, Michigan EV Everywhere Workshops * Recruit the best and brightest American scientists, engineers, and businesses to tackle this electric vehicle challenge * Re-evaluate and refine the existing technical goals for increasing performance and cutting costs Topic Date Location Electric Drive Components July 24-25 Chicago, IL Advanced Batteries July 26 Chicago, IL Consumer Behavior and Charging Infrastructure July 31 - Aug 1 Los Angeles, CA Lightweight Vehicles and Structures TBD TBD The EV Everywhere Challenge Involves All of DOE The EV Everywhere Challenge Key Parameters * 5-passenger vehicle suitable for an average American family

30

Anomalous diffusion in the resonant quantum kicked rotor  

E-Print Network (OSTI)

We study the resonances of the quantum kicked rotor subjected to an excitation that follows a deterministic time-dependent prescription. For the primary resonances we find an analytical relation between the long-time behavior of the standard deviation and the external kick strength. For the secondary resonances we obtain essentially the same result numerically. Selecting the time sequence of the kick allows to obtain a variety of asymptotic wave-function spreadings: super-ballistic, ballistic, sub-ballistic, diffusive, sub-diffusive and localized.

A. Romanelli; Guzmn Hernndez

2009-08-31T23:59:59.000Z

31

Exponential Quantum Spreading in a Class of Kicked Rotor Systems near High-Order Resonances  

E-Print Network (OSTI)

Long-lasting quantum exponential spreading was recently found in a simple but very rich dynamical model, namely, an on-resonance double-kicked rotor model [J. Wang, I. Guarneri, G. Casati, and J. B. Gong, Phys. Rev. Lett. 107, 234104 (2011)]. The underlying mechanism, unrelated to the chaotic motion in the classical limit but resting on quasi-integrable motion in a pseudoclassical limit, is identified for one special case. By presenting a detailed study of the same model, this work offers a framework to explain long-lasting quantum exponential spreading under much more general conditions. In particular, we adopt the so-called "spinor" representation to treat the kicked-rotor dynamics under high-order resonance conditions and then exploit the Born-Oppenheimer approximation to understand the dynamical evolution. It is found that the existence of a flat-band (or an effectively flat-band) is one important feature behind why and how the exponential dynamics emerges. It is also found that a quantitative prediction of the exponential spreading rate based on an interesting and simple pseudoclassical map may be inaccurate. In addition to general interests regarding the question of how exponential behavior in quantum systems may persist for a long time scale, our results should motivate further studies towards a better understanding of high-order resonance behavior in delta-kicked quantum systems.

Hailong Wang; Jiao Wang; Italo Guarneri; Giulio Casati; Jiangbin Gong

2013-08-16T23:59:59.000Z

32

Short-time quantum correlations in the atom optics kicked rotor  

E-Print Network (OSTI)

We experimentally verify the analytical expressions that exist for the diffusion rate in the quantum delta kicked rotor system for small numbers of kicks. We show development of diffusion resonances from two to five kicks, and of multiple resonances for high kick strengths. Furthermore, we show that, in contrast to classical predictions, the results are purely periodic in the kick period, and reproduce the predicted quantum- and diffusion resonances.

S. A. Wayper; W. Simpson; M. D. Hoogerland

2006-02-08T23:59:59.000Z

33

Vadose Zone Transport Field Study: Detailed Test Plan for Simulated Leak Tests  

Science Conference Proceedings (OSTI)

This report describes controlled transport experiments at well-instrumented field tests to be conducted during FY 2000 in support of DOE?s Vadose Zone Transport Field Study (VZTFS). The VZTFS supports the Groundwater/Vadose Zone Integration Project Science and Technology Initiative. The field tests will improve understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. These methods will capture the extent of contaminant plumes using existing steel-cased boreholes. Specific objectives are to 1) identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford?s waste disposal sites; 2) reduce uncertainty in conceptual models; 3) develop a detailed and accurate data base of hydraulic and transport parameters for validation of three-dimensional numerical models; and 4) identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. Pacific Northwest National Laboratory (PNNL) manages the VZTFS for DOE.

Ward, Anderson L.; Gee, Glendon W.

2000-06-23T23:59:59.000Z

34

ENERGY STAR Update: ENERGY STAR Low Carbon IT Campaign Kicks...  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon IT Campaign Kicks Off 2013 with Organizations Pledging to Power Manage 360,000 Computers The ENERGY STAR Low Carbon IT (LCIT) Campaign, a nationwide effort to assist and...

35

NNSA Administrator Kicks Off DOE's 'Feds Feed Families' Campaign |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kicks Off DOE's 'Feds Feed Families' Campaign Kicks Off DOE's 'Feds Feed Families' Campaign NNSA Administrator Kicks Off DOE's 'Feds Feed Families' Campaign June 16, 2011 - 12:00am Addthis WASHINGTON, D.C. - National Nuclear Security Administration (NNSA) Administrator Thomas P. D'Agostino today helped the Department of Energy (DOE) kick off its third annual "Feds Feed Families" campaign to assist local food banks in replenishing supplies during the summer months. DOE and NNSA, in partnership with the Office of Personnel Management (OPM) and other Federal agencies are participating in the nationwide effort to raise 2 million pounds of non-perishable food items for food banks across the country. Administrator D'Agostino and DOE's Chief Human Capital Officer Mike Kane once again serve as DOE campaign co-chairs.

36

Sub-ballistic behaviour of the Quantum Kicked Rotor  

E-Print Network (OSTI)

We study the resonances of the quantum kicked rotor subjected to an excitation that follows an aperiodic Fibonacci prescription. In such a case the secondary resonances show a sub-ballistic behaviour like the quantum walk with the same aperiodic prescription for the coin. The principal resonances maintain the well-known ballistic behaviour. Then the parallelism previusly established between the kicked rotor and the generalized quantum walk is retained only with the secondary resonances.

A. Romanelli; A. Auyuanet; R. Siri; V. Micenmacher

2006-07-20T23:59:59.000Z

37

Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in Energy Technology Are "Winning the Future" Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations...

38

Green Workforce Development for Youth Kicks Off | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workforce Development for Youth Kicks Off Workforce Development for Youth Kicks Off Green Workforce Development for Youth Kicks Off October 18, 2010 - 11:00am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Every time Jonathan Norton walks into a room now and flips the switch, he can't help but think about how the lights were wired. Or how the framing was installed. And if the insulation is efficient. "A lot of people hear about green construction," says Norton, a 21-year-old California Conservation Corps (CCC) member who's in midst of energy efficiency training developed by Sierra College's Center for Applied Competitive Technologies (CACT) in Rocklin, Calif. "But it's never really explained." "[These courses] help us understand how you live; how you build

39

Secretaries Bodman & Johanns Kick Off Renewable Energy Conference with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman & Johanns Kick Off Renewable Energy Conference Bodman & Johanns Kick Off Renewable Energy Conference with $17.5 Million for Biofuels Research & Development Grants Secretaries Bodman & Johanns Kick Off Renewable Energy Conference with $17.5 Million for Biofuels Research & Development Grants October 11, 2006 - 1:27pm Addthis ST. LOUIS, MO - U.S. Department of Agriculture (USDA) Secretary Mike Johanns and U.S. Department of Energy (DOE) Secretary Samuel Bodman today announced nearly $17.5 million for 17 biomass research, development and demonstration projects, to help break our nation's addiction to oil. The funding was announced while Secretaries Johanns and Bodman addressed the General Session at Advancing Renewable Energy: An American Rural Renaissance, a jointly hosted USDA-DOE conference aimed at furthering

40

Huizenga Kicks Off Waste Management Conference | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Huizenga Kicks Off Waste Management Conference Huizenga Kicks Off Waste Management Conference Huizenga Kicks Off Waste Management Conference February 25, 2013 - 12:00pm Addthis EM Senior Advisor Dave Huizenga speaks during the plenary session of the Waste Management Conference in Phoenix today. EM Senior Advisor Dave Huizenga speaks during the plenary session of the Waste Management Conference in Phoenix today. WM Symposia Board Chairman James Gallagher, left to right, U.S. Nuclear Regulatory Commission Member William Ostendorff, Natural Resources Canada Uranium & Radioactive Waste Division Director Dave McCauley, EM Senior Advisor Dave Huizenga and WM Symposia Board Member Fred Sheil gather for a photo at the Waste Management Conference. WM Symposia Board Chairman James Gallagher, left to right, U.S. Nuclear

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Green Workforce Development for Youth Kicks Off | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Workforce Development for Youth Kicks Off Green Workforce Development for Youth Kicks Off Green Workforce Development for Youth Kicks Off October 18, 2010 - 11:00am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Every time Jonathan Norton walks into a room now and flips the switch, he can't help but think about how the lights were wired. Or how the framing was installed. And if the insulation is efficient. "A lot of people hear about green construction," says Norton, a 21-year-old California Conservation Corps (CCC) member who's in midst of energy efficiency training developed by Sierra College's Center for Applied Competitive Technologies (CACT) in Rocklin, Calif. "But it's never really explained." "[These courses] help us understand how you live; how you build

42

Saturation of fidelity in the atom-optics kicked rotor  

E-Print Network (OSTI)

We show that the quantum fidelity is accessible to cold atom experiments for a large class of evolutions in periodical potentials, properly taking into account the experimental initial conditions of the atomic ensemble. We prove analytically that, at the fundamental quantum resonances of the atom-optics kicked rotor, the fidelity saturates at a constant, time-independent value after a small number of kicks. The latter saturation arises from the bulk of the atomic ensemble, whilst for the resonantly accelerated atoms the fidelity is predicted to decay slowly according to a power law.

Sandro Wimberger; Andreas Buchleitner

2006-03-10T23:59:59.000Z

43

Web-assisted tunneling in the kicked harmonic oscillator  

E-Print Network (OSTI)

We show that heating of harmonically trapped ions by periodic delta kicks is dramatically enhanced at isolated values of the Lamb-Dicke parameter. At these values, quasienergy eigenstates localized on island structures undergo avoided crossings with extended web-states.

Andr R. R. Carvalho; Andreas Buchleitner

2004-09-20T23:59:59.000Z

44

Universality of the Anderson transition with the quasiperiodic kicked rotor  

E-Print Network (OSTI)

We report a numerical analysis of the Anderson transition in a quantum-chaotic system, the quasiperiodic kicked rotor with three incommensurate frequencies. It is shown that this dynamical system exhibits the same critical phenomena as the truly random 3D-Anderson model. By taking proper account of systematic corrections to one-parameter scaling, the universality of the critical exponent is demonstrated. Our result $\

G. Lemari; B. Grmaud; D. Delande

2009-04-15T23:59:59.000Z

45

Fractional dynamics in the L\\'evy quantum kicked rotor  

E-Print Network (OSTI)

We investigate the quantum kicked rotor in resonance subjected to momentum measurements with a L\\'evy waiting time distribution. We find that the system has a sub-ballistic behavior. We obtain an analytical expression for the exponent of the power law of the variance as a function of the characteristic parameter of the L\\'evy distribution and connect this anomalous diffusion with a fractional dynamics.

Romanelli, Alejandro

2008-01-01T23:59:59.000Z

46

Utility of atomic kicked-rotor interferometers for precision measurements  

Science Conference Proceedings (OSTI)

We theoretically investigate a proposed scheme to use an atomic {delta}-kicked rotor resonance for high-precision measurements of accelerations and the photon recoil frequency. Although the technique offers rapid scaling of the measurement sensitivity with pulse number, it also features a high sensitivity to initial atomic momentum. We find that for realistic atom sources, the momentum sensitivity significantly limits the achievable precision. We consider several different variations on the technique, but find similar limitations in all cases.

Horne, R. A.; Leonard, R. H.; Sackett, C. A. [Physics Department, University of Virginia, Charlottesville, Virginia 22904 (United States)

2011-06-15T23:59:59.000Z

47

Suppression of decoherence effects in the quantum kicked rotor  

E-Print Network (OSTI)

We describe a method allowing transient suppression of decoherence effects on the atom-optics realization of the kicked rotor. The system is prepared in an initial state with a momentum distribution concentrated in an interval much sharper than the Brillouin zone; the measure of the momentum distribution is restricted to this interval of quasimomenta: As most of the atoms undergoing decoherence processes fall outside this detection range and thus are not detected, the measured signal is effectively decoherence-free.

Maxence Lepers; Vronique Zehnl; Jean Claude Garreau

2010-04-15T23:59:59.000Z

48

Fractional dynamics in the Lvy quantum kicked rotor  

E-Print Network (OSTI)

We investigate the quantum kicked rotor in resonance subjected to momentum measurements with a L\\'evy waiting time distribution. We find that the system has a sub-ballistic behavior. We obtain an analytical expression for the exponent of the power law of the variance as a function of the characteristic parameter of the L\\'evy distribution and connect this anomalous diffusion with a fractional dynamics.

Alejandro Romanelli

2008-04-15T23:59:59.000Z

49

Transverse emittance dilution due to coupler kicks in linear accelerators  

E-Print Network (OSTI)

One of the main concerns in the design of low emittance linear accelerators (linacs) is the preservation of beam emittance. Here we discuss one possible source of emittance dilution due to transverse electromagnetic fields in the accelerating cavities of the linac caused by the power coupler geometry. It is common wisdom that emittance growth from coupler kicks can be strongly reduced by having the coupler location alternate from above to below the beam pipe so that the coupler kick from one cavity is compensated by that of the next. While this is correct, alternating the coupler location requires large technical changes in superconducting cryomodules where cryogenic pipes are arranged parallel to a string of several cavities. We show here that cavities with high external $Q$ have coupler kicks that change the sign of their phase when the coupler is moved from before to after the cavity, as long as one accelerates on crest. This implies that the emittance growth from one cavity can be canceled by the next, pr...

Buckley, Brandon

2007-01-01T23:59:59.000Z

50

Observation of coherence revival and fidelity saturation in a delta-kicked rotor potential  

E-Print Network (OSTI)

We experimentally investigate the effect of atomic delta-kicked rotor potentials on the mutual coherence between wavepackets in an atom interferometer. The differential action of the kicked rotor degrades the mutual coherence, leading to a reduction of the interferometry fringe visibility; however, when the repetition rate of the kicked rotor is at or near the quantum resonance, we observe revival of matter-wave coherence as the number of kicks increases, resulting in non-vanishing coherence in the large kick number limit. This coherence saturation effect reflects a fidelity saturation in phase-space displacement echoes in deep quantum regime. The saturation effect is accompanied with an invariant distribution of matter-wave coherence under the kicked rotor perturbations.

Wu, Saijun; Prentiss, Mara G

2008-01-01T23:59:59.000Z

51

Observation of coherence revival and fidelity saturation in a delta-kicked rotor potential  

E-Print Network (OSTI)

We experimentally investigate the effect of atomic $\\delta$-kicked rotor potentials on the mutual coherence between wavepackets in an atom interferometer. The differential action of the kicked rotor degrades the mutual coherence, leading to a reduction of the interferometry fringe visibility; however, when the repetition rate of the kicked rotor is at or near the quantum resonance, we observe revival of matter-wave coherence as the number of kicks increases, resulting in non-vanishing coherence in the large kick number limit. This coherence saturation effect reflects a saturation of fidelity decay due to momentum displacements in deep quantum regime. The saturation effect is accompanied with an invariant distribution of matter-wave coherence under the kicked rotor perturbations.

Saijun Wu; Alexey Tonyushkin; Mara G. Prentiss

2008-01-03T23:59:59.000Z

52

Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Multi-Year R&D Program Plan NATIONAL METHANE HYDRATE MULTI-YEAR R&D PROGRAM PLAN U.S. Department of Energy Office of Fossil Energy Federal Energy Technology Center...

53

Minutes from Durability Working Group Kick-off meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Minutes from Durability Working Group (DWG) Kick-off Meeting 6/9/10 Contaminants Discussion on effect of air and system contaminants on performance and durability, initiated by S. Blanchet (Nuvera) Question of extent of impurity work in six newly-awarded durability projects represented at this meeting. None of the projects are specifically looking at the effect of system and air impurities on long- term performance degradation. New Argonne durability project does include task on effect of impurities introduced during catalyst synthesis on degradation mechanisms. Discussion on inclusion of newly-funded contaminant projects on durability working group - as these

54

Decoherence without classicality in the resonant quantum kicked rotor  

E-Print Network (OSTI)

We study the quantum kicked rotor in resonance subjected to an unitary noise defined through Kraus operators, we show that this type of decoherence does not, in general, lead to the classical diffusive behavior. We find exact analytical expressions for the density matrix and the variance in the primary resonances. The variance does not loose its ballistic behavior, however the coherence decays as a power law. The secondary resonances are treated numerically, obtaining a power-law decay for the variance and an exponential law decay for the coherence.

A. Romanelli

2009-05-05T23:59:59.000Z

55

Quantum phase transitions in the quasi-periodic kicked rotor  

E-Print Network (OSTI)

We present a microscopic theory of transport in quasi-periodically driven environments (`kicked rotors'), as realized in recent atom optic experiments. We find that the behavior of these systems depends sensitively on the value of Planck's constant $\\tilde h$: for irrational values of $\\tilde h/(4\\pi)$ they fall into the universality class of disordered electronic systems and we derive the microscopic theory of the ensuing localization phenomena. In contrast, for rational values the rotor-Anderson insulator acquires an infinite (static) conductivity and turns into a `super-metal'. Signatures of the corresponding metal/super-metal transition are discussed.

Chushun Tian; Alexander Altland; Markus Garst

2011-01-17T23:59:59.000Z

56

Classical diffusive dynamics for the quasiperiodic kicked rotor  

E-Print Network (OSTI)

We study the classical dynamics of a quasiperiodic kicked rotor, whose quantum counterpart is known to be an equivalent of the 3D Anderson model. Using this correspondence allowed for a recent experimental observation of the Anderson transition with atomic matter waves. In such a context, it is particularly important to assert the chaotic character of the classical dynamics of this system. We show here that it is a 3D anisotropic diffusion. Our simple analytical predictions for the associated diffusion tensor are found in good agreement with the results of numerical simulations.

Gabriel Lemari; Dominique Delande; Jean Claude Garreau; Pascal Szriftgiser

2010-03-23T23:59:59.000Z

57

Atom optics kicked rotor: experimental evidence for a pendulum description of the quantum resonance  

E-Print Network (OSTI)

We present measurements of the mean energy for an atom optics kicked rotor ensemble close to quantum resonance. Oscillations in the mean energy in this regime are are shown to be in agreement with a quasi--classical pendulum approximation. The period of the oscillations is shown to scale with a single variable, which depends on the number of kicks.

S. Wayper; M. Sadgrove; W. Simpson; M. D. Hoogerland

2005-04-29T23:59:59.000Z

58

The Iterative Unitary Matrix Multiply Method and Its Application to Quantum Kicked Rotator  

E-Print Network (OSTI)

We use the iterative unitary matrix multiply method to calculate the long time behavior of the resonant quantum kicked rotator with a large denominator. The delocalization time is exponentially large. The quantum wave delocalizes through degenerate states. At last we construct a nonresonant quantum kicked rotator with delocalization.

Tao Ma

2007-09-14T23:59:59.000Z

59

DOE Announces Webinars on Kick-Starting an Energy Management Program,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kick-Starting an Energy Management Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More DOE Announces Webinars on Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More December 20, 2013 - 8:58am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced registration is typically required. You can also watch archived webinars and browse previously aired videos, slides, and transcripts. Upcoming Webinars January 7: Live Webinar on Kick-starting Your Energy Management Program Webinar Sponsor: EERE's Better Buildings Initiative The Energy Department will present a live webinar titled "Kick-Starting

60

Demonstration of perfect coherence preservation for matter-waves perturbed by a delta-kicked rotor  

E-Print Network (OSTI)

We demonstrate perfect coherence preservation in an atom interferometer perturbed by optical standing wave pulses acting as a kicked rotor. In our experiment we subject a cloud of cold rubidium atoms in a magnetic guide to periodic kicks from a sinusoidal potential created by standing wave pulses of off-resonant laser light propagating along the guiding direction. While, in general, we observed a strong decoherence of matter-waves due to applied perturbations the coherence is perfectly preserved for the conditions similar but not limited to quantum resonances of the quantum kicked rotor. Moreover, these conditions do not depend on the number of kicks applied or require any regularity in the pulse strengths. We show that the narrowing of the width of coherence revival as a function of increasing kick number provides a new method for precise measurement of recoil frequency.

Tonyushkin, A; Prentiss, M

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Clean Energy Projects Kick Off U.S.-China Collaborative R&D Initiative |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Projects Kick Off U.S.-China Collaborative R&D Projects Kick Off U.S.-China Collaborative R&D Initiative Clean Energy Projects Kick Off U.S.-China Collaborative R&D Initiative July 9, 2010 - 1:00pm Addthis Washington, DC - Three clean energy technology projects resulting from a 2009 agreement between the United States and China are kicking off a new collaborative research effort that will focus on managing carbon dioxide emissions and reducing the environmental impact of energy production. The projects are a joint research effort between two U.S. Department of Energy (DOE) laboratories - the National Energy Technology Laboratory (NETL) and the Pacific Northwest National Laboratory (PNNL) - and the Chinese Academy of Sciences. U.S. Energy Secretary Steven Chu said international cooperation is a key

62

DOE Kicks Off National "Change a Light, Change the World" Campaign |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kicks Off National "Change a Light, Change the World" Campaign Kicks Off National "Change a Light, Change the World" Campaign DOE Kicks Off National "Change a Light, Change the World" Campaign October 3, 2006 - 9:08am Addthis ATLANTA, GA - U.S. Department of Energy (DOE) Assistant Secretary for Policy and International Affairs Karen A. Harbert today joined Georgia Power President and CEO Mike Garrett to kick off the seventh annual ENERGY STAR ® National "Change a Light, Change the World" campaign at Georgia Power headquarters. The "Change a Light" campaign is a national call-to-action by the U.S. Environmental Protection Agency (EPA) and DOE encouraging all Americans to help change the world, one light - one energy-saving step - at a time. The "Change a Light" campaign runs from

63

Vice President Biden Kicks Off Five Days of Earth Day Activities with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vice President Biden Kicks Off Five Days of Earth Day Activities Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort April 21, 2010 - 12:00am Addthis Washington, D.C. -- Vice President Biden will today kick off five days of Administration events around the 40th anniversary of Earth Day with the announcement of the selection of 25 communities for up to $452 million in Recovery Act funding to "ramp-up" energy efficiency building retrofits. Under the Department of Energy's Retrofit Ramp-Up initiative, communities, governments, private sector companies and non-profit organizations will work together on pioneering and innovative programs for concentrated and

64

Secretary of Energy to Kick Off "Energizing America for Energy Security"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Kick Off "Energizing America for Energy to Kick Off "Energizing America for Energy Security" Tour Secretary of Energy to Kick Off "Energizing America for Energy Security" Tour June 9, 2005 - 2:28pm Addthis Will Speak Directly to the American People on the Need to Pass the Energy Bill WASHINGTON, DC -- Secretary of Energy Samuel W. Bodman today announced the "Energizing America for Energy Security" Tour. Secretary Bodman and other Department of Energy officials, including Deputy Secretary Clay Sell, will travel the country this summer to speak directly to the American people about the need for Congress to pass comprehensive energy legislation before the August Congressional recess. Secretary Bodman will kick off the tour outside of Denver on Monday, June 13, 2005 in Wheat Ridge, Colo.

65

2013 Tribal Renewable Energy Webinar Series to Kick Off January 30 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Renewable Energy Webinar Series to Kick Off January 30 Tribal Renewable Energy Webinar Series to Kick Off January 30 2013 Tribal Renewable Energy Webinar Series to Kick Off January 30 January 24, 2013 - 3:52pm Addthis In response to popular demand, the DOE Office of Indian Energy Policy and Programs, the Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration will continue their joint sponsorship of the Tribal Renewable Energy Webinar Series in 2013. The DOE Office of Indian Energy will kick off this year's schedule on January 30 from 11 a.m. to 12:30 p.m. Mountain Time with a webinar entitled Strategic Technical Response Team (START) and Online Education Program Update. Presented by DOE Indian Energy START team members Elizabeth Doris and Alexander Dane of DOE's National Renewable Energy Laboratory, this

66

Department of Energy Kicks Off the State of Environmental Justice in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Kicks Off the State of Environmental Justice Department of Energy Kicks Off the State of Environmental Justice in America 2011 Conference Department of Energy Kicks Off the State of Environmental Justice in America 2011 Conference April 27, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy, along with the U.S. Department of Agriculture, the U.S. Department of Interior, the U.S. Environmental Protection Agency, the National Small Town Alliance, the Howard University School of Law and others, kicked off the State of Environmental Justice in America 2011 Conference today in Washington, D.C. This year's conference theme is "Building the Clean Energy Economy with Equity," and will focus on climate change, green jobs and equity for low-income, minority and Tribal populations. The goal is to continue

67

Secretary Chu to Kick-off the Electric Drive Transportation Association's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kick-off the Electric Drive Transportation Kick-off the Electric Drive Transportation Association's Innovation Motorcade Secretary Chu to Kick-off the Electric Drive Transportation Association's Innovation Motorcade April 18, 2011 - 12:00am Addthis WASHINGTON - Tuesday, April, 19, 2011, U.S. Energy Secretary Steven Chu will help kick-off the Electric Drive Transportation Association Annual Conference by participating in the Innovation Motorcade, an all electric vehicle motorcade that will start at the Department of Energy and travel around the city. Supporting electric vehicles will help the U.S. reach President Obama's bold but achievable goal of reducing oil imports by one-third by 2025. Secretary Chu will give remarks at the opening ceremony and participate in a brief press conference. WHO: Secretary of Energy Steven Chu

68

United Way Campaign Kick-Off | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

United Way Campaign Kick-Off United Way Campaign Kick-Off United Way Campaign Kick-Off Posted: September 30, 2013 - 6:36pm Y-12's 2013 United Way Campaign officially kicked off at the end of August with an event featuring Holly Warlick, head basketball coach of the University of Tennessee Lady Vols. She encouraged Y-12 employees to increase their giving and challenged the site to do more for the community. "I hear you all are in the top five of giving to United Way - don't you want to be number one?" she asked. "Y'all need to be on top. Y'all need to be number one." Speaking of number one, Warlick talked about her new team, which will try to repeat as Southeastern Conference champions, and the work they do beyond basketball. "We try to get our young ladies to give back," Warlick

69

Vice President Biden Kicks Off Five Days of Earth Day Activities with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vice President Biden Kicks Off Five Days of Earth Day Activities Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort April 21, 2010 - 12:00am Addthis Washington, D.C. -- Vice President Biden will today kick off five days of Administration events around the 40th anniversary of Earth Day with the announcement of the selection of 25 communities for up to $452 million in Recovery Act funding to "ramp-up" energy efficiency building retrofits. Under the Department of Energy's Retrofit Ramp-Up initiative, communities, governments, private sector companies and non-profit organizations will work together on pioneering and innovative programs for concentrated and

70

The initial momentum dependence of the quantum resonance in the delta-kicked rotor  

E-Print Network (OSTI)

The influence of an initial momentum on the appearance of "quantum resonances" in the delta-kicked rotor system is explored experimentally. We show that for certain initial momenta, a resonance can be negated entirely, whereas at others a resonance can be made to appear. At a larger number of kicks, all resonances are shown to narrow. We show that as a consequence, the individual "diffraction peaks" may split. We compare our results to numerical simulations as well as analytical theory.

J-A. Currivan; A. Ullah; M. D. Hoogerland

2008-06-18T23:59:59.000Z

71

The role of quasi-momentum in the resonant dynamics of the atom-optics kicked rotor  

E-Print Network (OSTI)

We examine the effect of the initial atomic momentum distribution on the dynamics of the atom-optical realisation of the quantum kicked rotor. The atoms are kicked by a pulsed optical lattice, the periodicity of which implies that quasi-momentum is conserved in the transport problem. We study and compare experimentally and theoretically two resonant limits of the kicked rotor: in the vicinity of the quantum resonances and in the semiclassical limit of vanishing kicking period. It is found that for the same experimental distribution of quasi-momenta, significant deviations from the kicked rotor model are induced close to quantum resonance, while close to the classical resonance (i.e. for small kicking period) the effect of the quasi-momentum vanishes.

Sandro Wimberger; Mark Sadgrove

2005-05-20T23:59:59.000Z

72

Power Electronics Reliability Kick Off Meeting ? Silicon Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management (PHM) * Integrated Logistics Support * Technology Management Optimization * Asset Acquisition & Mission Planning * Risk Assessment & Risk Management Technologies...

73

Watch Live as Secretary Moniz Kicks off the Minorities in Energy Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Watch Live as Secretary Moniz Kicks off the Minorities in Energy Watch Live as Secretary Moniz Kicks off the Minorities in Energy Initiative Watch Live as Secretary Moniz Kicks off the Minorities in Energy Initiative September 24, 2013 - 10:35am Addthis Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity During National Hispanic Heritage Month, we celebrate the successes of the Hispanic community and reaffirm our commitment to including persons of Hispanic descent in the Department's programs and activities. Sandra Guzman, award winning multimedia journalist and former editor-in-chief of Latina magazine, will open the program by sharing her unique perspective and serving as Mistress of Ceremonies. Join us from 11am - 12:30pm EST to watch the program. The Minorities in Energy Initiative will link together representatives from

74

DOE National Science Bowl Kicks Off Tomorrow, April 27 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Science Bowl Kicks Off Tomorrow, April 27 National Science Bowl Kicks Off Tomorrow, April 27 DOE National Science Bowl Kicks Off Tomorrow, April 27 April 26, 2012 - 12:11pm Addthis WASHINGTON, D.C. - Friday, April 27, through Monday, April 30, 113 regional high school and middle school championship teams from 42 states, the District of Columbia, Puerto Rico and the U.S. Virgin Islands will compete in the 22nd annual U.S. Department of Energy National Science Bowl final competition in Washington D.C. The students will be quizzed on all science disciplines, including biology, chemistry, earth science, physics, astronomy, and math. High school teams will solve hands-on science problems on Friday, April 27, and have their question-and-answer portion of the competition on Sunday, April 29. The middle school question-and-answer portion of the

75

DOE National Science Bowl Kicks off Saturday, April 30 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Science Bowl Kicks off Saturday, April 30 Science Bowl Kicks off Saturday, April 30 DOE National Science Bowl Kicks off Saturday, April 30 April 28, 2011 - 12:00am Addthis WASHINGTON, D.C. - 110 regional high school and middle school championship teams from 44 states, the District of Columbia, Puerto Rico and the U.S. Virgin Islands will compete in the 21st annual U.S. Department of Energy National Science Bowl final competition in Washington D.C. April 30th through May 2nd. The students will be quizzed on all science disciplines, including biology, chemistry, earth science, physics and astronomy, as well as math, and they will also compete in hands-on events. The middle school question-and-answer portion of the competition will begin Saturday, April 30th followed by a hydrogen fuel cell model car race on

76

Head of EM to Kick Off Congressional Nuclear Cleanup Caucus | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Head of EM to Kick Off Congressional Nuclear Cleanup Caucus Head of EM to Kick Off Congressional Nuclear Cleanup Caucus Head of EM to Kick Off Congressional Nuclear Cleanup Caucus April 22, 2013 - 12:00pm Addthis WASHINGTON, D.C. - EM Senior Advisor Dave Huizenga will provide an overview of EM's proposed fiscal year 2014 budget Thursday in the first of six briefings for the 19th annual U.S. House Nuclear Cleanup Caucus. Huizenga rolled out the $5.622 billion budget request earlier this month. The proposal, which requires approval by Congress, enables EM progress in all areas of the nuclear cleanup program while maintaining safety and compliance across the complex. The briefings are organized by Rep. Doc Hastings (R-Wash.), who chairs the bipartisan caucus. "These briefings provide valuable insight and help educate my colleagues

77

Detailed technical plan for Test Program Element-III (TPE-III) of the first wall/blanket shield engineering test program  

Science Conference Proceedings (OSTI)

The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.

Turner, L.R.; Praeg, W.F.

1982-03-01T23:59:59.000Z

78

Wakefield and RF Kicks Due to Coupler Asymmetry in TESLA-Type Accelerating Cavities  

SciTech Connect

In a future linear collider, such as the International Linear Collider (ILC), trains of high current, low emittance bunches will be accelerated in a linac before colliding at the interaction point. Asymmetries in the accelerating cavities of the linac will generate fields that will kick the beam transversely and degrade the beam emittance and thus the collider performance. In the main linac of the ILC, which is filled with TESLA-type superconducting cavities, it is the fundamental (FM) and higher mode (HM) couplers that are asymmetric and thus the source of such kicks. The kicks are of two types: one, due to (the asymmetry in) the fundamental RF fields and the other, due to transverse wakefields that are generated by the beam even when it is on axis. In this report we calculate the strength of these kicks and estimate their effect on the ILC beam. The TESLA cavity comprises nine cells, one HM coupler in the upstream end, and one (identical, though rotated) HM coupler and one FM coupler in the downstream end (for their shapes and location see Figs. 1, 2) [1]. The cavity is 1.1 m long, the iris radius 35 mm, and the coupler beam pipe radius 39 mm. Note that the couplers reach closer to the axis than the irises, down to a distance of 30 mm.

Bane, K.L.F.; Adolphsen, C.; Li, Z.; /SLAC; Dohlus, M.; Zagorodnov, I.; /DESY; Gonin, I.; Lunin, A.; Solyak, N.; Yakovlev, V.; /Fermilab; Gjonaj, E.; Weiland, T.; /Darmstadt, Tech. Hochsch.

2008-07-07T23:59:59.000Z

79

Can quantum fractal fluctuations be observed in an atom-optics kicked rotor experiment?  

E-Print Network (OSTI)

We investigate the parametric fluctuations in the quantum survival probability of an open version of the delta-kicked rotor model in the deep quantum regime. Spectral arguments [Guarneri I and Terraneo M 2001 Phys. Rev. E vol. 65 015203(R)] predict the existence of parametric fractal fluctuations owing to the strong dynamical localisation of the eigenstates of the kicked rotor. We discuss the possibility of observing such dynamically-induced fractality in the quantum survival probability as a function of the kicking period for the atom-optics realisation of the kicked rotor. The influence of the atoms' initial momentum distribution is studied as well as the dependence of the expected fractal dimension on finite-size effects of the experiment, such as finite detection windows and short measurement times. Our results show that clear signatures of fractality could be observed in experiments with cold atoms subjected to periodically flashed optical lattices, which offer an excellent control on interaction times and the initial atomic ensemble.

Andrea Tomadin; Riccardo Mannella; Sandro Wimberger

2005-12-01T23:59:59.000Z

80

CHAPTER 2 TEST No calculators, no cell phones, kick it old school.  

E-Print Network (OSTI)

wagon one year ago, the tank had 19 gallons of gas in it. Today he ran out of gas. #12;3. Suppose fCHAPTER 2 TEST No calculators, no cell phones, kick it old school. Math 231 October 6, 2008 Name: By printing my name I pledge to uphold the honor code. 1. Calculate each of the following limits. Show all

Taalman, Laura

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

SOLERAS - Solar Energy Water Desalination Project: Exxon Research and Engineering. System design final report. Volume 3. Appendices pilot plan and design details and subsystem direct cost support  

Science Conference Proceedings (OSTI)

Details of the design of a water desalination solar pilot plant in Yanbu, Saudi Arabia are presented. The major subsystems of the plant are defined, including solar energy collection and simulation, energy storage, energy delivery, reverse osmosis/multiple effect distillation, water storage, waste disposal, backup power generators, controls and instrumentation data acquisition, facilities and enclosures, and computers. A list of the plant equipment and a set of process flow diagrams are provided. A cost analysis of the pilot plant is included. (BCS)

Not Available

1985-01-01T23:59:59.000Z

82

Energy Secretary Bodman Kicks Off "Energizing America for Energy Security"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Energizing America for Energy "Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home" Energy Secretary Bodman Kicks Off "Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home" June 13, 2005 - 4:51pm Addthis WHEAT RIDGE, COLORADO - Secretary of Energy Samuel W. Bodman today kicked off the "Energizing America for Energy Security" Tour with a visit to Habitat for Humanity's first "true net-zero energy home" to highlight the need to improve energy efficiency, a key component of President Bush's National Energy Policy (NEP). The NEP calls for using energy wisely by increasing energy conservation and efficiency. "Increasing energy efficiency is a critical element of the comprehensive

83

Fert kicks off Wigner Lectures to full house | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Fert kicks off Wigner Lectures to full house Fert kicks off Wigner Lectures to full house (hi-res image) Nobel Laureate Albert Fert gave the inaugural Eugene Wigner Distinguished Lecture Monday to a packed house at the Spallation Neutron Source's Iran Thomas Auditorium. The lecture, hosted by ORNL's Corporate Fellows, was titled "Novel Directions for Spintronics: Spin-orbitronics and Magnetic Skyrmions." Fert shared the 2007 Nobel Prize in Physics for the discovery of giant magnetoresistance, a phenomenon that launched the field of spintronics and revolutionized the electronics industry. In addition to his keynote to about 350 lab staff, Fert attended a poster session featuring postdoctoral students and Lab-Directed Research and Development projects on Monday afternoon on ORNL's Main Street. Very much

84

NETL: 2009 Conference Proceedings - Pre-combustion CO2 Capture Kick-off  

NLE Websites -- All DOE Office Websites (Extended Search)

Pre-combustion CO2 Capture Kick-off Meetings Pre-combustion CO2 Capture Kick-off Meetings Pittsburgh, PA November 12-13, 2009 Table of Contents Disclaimer Presentations PRESENTATIONS Welcome/Sequestration Program Overview [PDF-842KB] Sean Plasynski, Sequestration Technology Manager Hydrogen Selective Ex-foliated Zeolite Membranes [PDF-3.4MB] University Of Minnesota Designing and Validating Ternary Pd Alloys for Optimum Sulfur/Carbon Resistance in Hydrogen Separation and Carbon Capture Membrane Systems Using High-Throughput Combinatorial Methods [PDF-746KB] Pall Corporation Pre-Combustion Carbon Dioxide Capture by a New Dual-Phase Ceramic-Carbonate Membrane Reactor [PDF-1.7MB] Arizona State University CO2 Capture from IGCC Gas Streams Using the AC-ABC Process [PDF-842KB] SRI International A Low-Cost, High-Efficiency Regenerable Sorbent for Pre-Combustion CO2 Capture [PDF-1.2MB]

85

COMPARISON OF OFF-LINE IR BUMP AND ACTION-ANGLE KICK MINIMIZATION.  

Science Conference Proceedings (OSTI)

The interaction region bump (IR bump) nonlinear correction method has been used for the sextupole and octupole field error on-line corrections in the Relativistic Heavy Ion Collider (RHIC) . Some differences were found for the sextupole and octupole corrector strengths between the on-line IR bump correction and the predictions from the action-angle kick minimization. In this article, we compare the corrector strengths from these two methods based on the RHIC Blue ring lattice with the IR nonlinear modeling. The comparison confirms the differences between resulting corrector strengths. And the reason for the differences is found and discussed.

LUO, Y.; PILAT, F.; PTITSYN, V.; TRBOJEVIC, D.; WEI, J.

2005-05-16T23:59:59.000Z

86

Suppression of decoherence-induced diffusion in the quantum kicked rotor  

Science Conference Proceedings (OSTI)

We describe a method that allows transient suppression of spontaneous emission-induced diffusion in the atom-optics realization of the kicked rotor. The system is prepared in an initial state with a momentum distribution concentrated in an interval much sharper than the Brillouin zone; the measure of the momentum distribution is restricted to this interval of quasimomenta. Because most of the atoms undergoing decoherence processes fall outside this detection range and thus are not detected, the measured signal is effectively free of decoherence-induced diffusion effects.

Lepers, Maxence; Zehnle, Veronique; Garreau, Jean Claude [Laboratoire de Physique des Lasers, Atomes et Molecules, Universite Lille 1 Sciences et Technologies, CNRS, F-59655 Villeneuve d'Ascq Cedex (France)

2010-06-15T23:59:59.000Z

87

Energy Secretary Bodman Kicks Off National "Easy Ways to Save Energy"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National "Easy Ways to Save National "Easy Ways to Save Energy" Campaign Energy Secretary Bodman Kicks Off National "Easy Ways to Save Energy" Campaign October 3, 2005 - 11:04am Addthis WASHINGTON DC - Secretary of Energy Samuel W. Bodman today unveiled a comprehensive national campaign to highlight how American families, businesses and the federal government can save energy in response to rising winter energy costs. Secretary Bodman was joined in announcing this effort by Kateri Callahan, President of The Alliance to Save Energy. "As a result of tight oil and gas markets, and the damage done by Hurricanes Katrina and Rita, it's likely that consumers will see an increase in their heating bills this winter," Secretary Bodman said. "Our entire administration, from the President on down, is concerned about the

88

ENERGY STAR Update: Change the World, Start with ENERGY STAR Kicks Off (April 12, 2013)  

NLE Websites -- All DOE Office Websites (Extended Search)

2, 2013 2, 2013 Change the World, Start with ENERGY STAR Kicks Off with Announcement of Top Pledge Drivers Earth Day is right around the corner and the U.S. Environmental Protection Agency (EPA) is celebrating this important holiday by once again by announcing our top pledge drivers and inviting you to join all of us in changing the world with ENERGY STAR. Congratulations to: Georgia Power Company, Girl Scouts of the USA, Samsung Electronics, Nissan North America, and Ameren Illinois. Saving energy and reducing greenhouse gas pollution are more important than ever. Climate change is a real and urgent challenge affecting people and the environment worldwide. Through our collective energy-saving efforts, representing more than 3 million Americans, we are on track to save nearly $1.2

89

Delocalized and Resonant Quantum Transport in Nonlinear Generalizations of the Kicked Rotor Model  

E-Print Network (OSTI)

We analyze the effects of a nonlinear cubic perturbation on the delta-Kicked Rotor. We consider two different models, in which the nonlinear term acts either in the position or in the momentum representation. We numerically investigate the modifications induced by the nonlinearity in the quantum transport in both localized and resonant regimes and a comparison between the results for the two models is presented. Analyzing the momentum distributions and the increase of the mean square momentum, we find that the quantum resonances asymptotically are very stable with respect to the nonlinear perturbation of the rotor's phase evolution. For an intermittent time regime, the nonlinearity even enhances the resonant quantum transport, leading to superballistic motion.

Laura Rebuzzini; Sandro Wimberger; Roberto Artuso

2004-10-12T23:59:59.000Z

90

Observation of high-order quantum resonances in the kicked rotor  

E-Print Network (OSTI)

Quantum resonances in the kicked rotor are characterized by a dramatically increased energy absorption rate, in stark contrast to the momentum localization generally observed. These resonances occur when the scaled Planck's constant hbar=(r/s)*4pi, for any integers r and s. However only the hbar=r*2pi resonances are easily observable. We have observed high-order quantum resonances (s>2) utilizing a sample of low temperature, non-condensed atoms and a pulsed optical standing wave. Resonances are observed for hbar=(r/16)*4pi r=2-6. Quantum numerical simulations suggest that our observation of high-order resonances indicates a larger coherence length than expected from an initially thermal atomic sample.

J. F. Kanem; S. Maneshi; M. Partlow; M. Spanner; A. M. Steinberg

2006-04-15T23:59:59.000Z

91

Documents: Program Planning and Decision Making  

NLE Websites -- All DOE Office Websites (Extended Search)

documents Program Planning and Decision Making PDF Icon Final Plan for the Conversion of Depleted Uranium Hexafluoride 345 KB details PDF Icon Depleted Uranium Hexafluoride...

92

On the continuous spectral component of the Floquet operator for a periodically kicked quantum system  

SciTech Connect

By a straightforward generalization, we extend the work of Combescure [J. Stat. Phys. 59, 679 (1990)] from rank-1 to rank-N perturbations. The requirement for the Floquet operator to be pure point is established and compared to that in Combescure. The result matches that in McCaw and McKeller [J. Math. Phys. 46, 032108 (2005)]. The method here is an alternative to that work. We show that if the condition for the Floquet operator to be pure point is relaxed, then in the case of the {delta}-kicked Harmonic oscillator, a singularly continuous component of the Floquet operator spectrum exists. We also provide an in-depth discussion of the conjecture presented in the work of Combescure of the case where the unperturbed Hamiltonian is more general. We link the physics conjecture directly to a number-theoretic conjecture of Vinogradov [The Method of Trigonometrical Sums in the Theory of Numbers (Interscience, London, 1954)] and show that a solution of Vinogradov's conjecture solves the physics conjecture. The result is extended to the rank-N case. The relationship between our work and the work of Bourget [J. Math. Anal. Appl. 276, 28 (2002); 301, 65 (2005)], on the physics conjecture is discussed.

McCaw, James; McKellar, B.H.J. [School of Physics, Research Centre for High Energy Physics, University of Melbourne, Victoria, 3010 (Australia)

2005-10-01T23:59:59.000Z

93

Shifting the boundaries: pulse-shape effects in the atom-optics kicked rotor  

E-Print Network (OSTI)

We present the results of experiments performed on cold caesium in a pulsed sinusoidal optical potential created by counter-propagating laser beams having a small frequency difference in the laboratory frame. Since the atoms, which have average velocity close to zero in the laboratory frame, have non-zero average velocity in the co-moving frame of the optical potential, we are able to centre the initial velocity distribution of the cloud at an arbitrary point in phase-space. In particular, we demonstrate the use of this technique to place the initial velocity distribution in a region of phase-space not accessible to previous experiments, namely beyond the momentum boundaries arising from the finite pulse duration of the potential. We further use the technique to explore the kicked rotor dynamics starting from a region of phase-space where there is a strong velocity dependence of the diffusion constant and quantum break time and demonstrate that this results in a marked asymmetry in the chaotic evolution of the atomic momentum distribution.

P. H. Jones; M. Goonasekera; H. E. Saunders-Singer; D. R. Meacher

2003-11-18T23:59:59.000Z

94

Theory of localization and resonance phenomena in the quantum kicked rotor  

E-Print Network (OSTI)

We present an analytic theory of quantum interference and Anderson localization in the quantum kicked rotor (QKR). The behavior of the system is known to depend sensitively on the value of its effective Planck's constant $\\he$. We here show that for rational values of $\\he/(4\\pi)=p/q$, it bears similarity to a disordered metallic ring of circumference $q$ and threaded by an Aharonov-Bohm flux. Building on that correspondence, we obtain quantitative results for the time--dependent behavior of the QKR kinetic energy, $E(\\tilde t)$ (this is an observable which sensitively probes the system's localization properties). For values of $q$ smaller than the localization length $\\xi$, we obtain scaling $E(\\tilde t) \\sim \\Delta \\tilde t^2$, where $\\Delta=2\\pi/q$ is the quasi--energy level spacing on the ring. This scaling is indicative of a long time dynamics that is neither localized nor diffusive. For larger values $q\\gg \\xi$, the functions $E(\\tilde t)\\to \\xi^2$ saturates (up to exponentially small corrections $\\sim\\exp(-q/\\xi)$), thus reflecting essentially localized behavior.

C. Tian; A. Altland

2010-01-25T23:59:59.000Z

95

IDENTIFYING CONTRIBUTIONS TO THE STELLAR HALO FROM ACCRETED, KICKED-OUT, AND IN SITU POPULATIONS  

Science Conference Proceedings (OSTI)

We present a medium-resolution spectroscopic survey of late-type giant stars at mid-Galactic latitudes of (30 Degree-Sign fall on the locus defined by the majority of stars in the halo. The chemical abundance trends of the RV outliers suggest that this sample consists predominantly of stars accreted from infalling dwarf galaxies. A smaller fraction of stars in the RV outlier sample may have been formed in the inner Galaxy and subsequently kicked to higher eccentricity orbits, but the sample is not large enough to distinguish conclusively between this interpretation and the alternative that these stars represent the tail of the velocity distribution of the thick disk. Our data do not rule out the possibility that a minority of the sample could have formed from gas in situ on their current orbits. These results are consistent with scenarios where the stellar halo, at least as probed by M giants, arises from multiple formation mechanisms; however, when taken at face value, our results for metal-rich halo giants suggest a much higher proportion to be accreted than found by Carollo et al. and more like the fraction suggested in the analysis by Nissen and Schuster and Schuster et al. We conclude that M giants with large RVs can provide particularly fruitful samples to mine for accreted structures and that some of the velocity sequences may indeed correspond to real physical associations resulting from recent accretion events.

Sheffield, Allyson A.; Johnston, Kathryn V. [Department of Astronomy, Columbia University, Mail Code 5246, New York, NY 10027 (United States); Majewski, Steven R., E-mail: asheffield@astro.columbia.edu, E-mail: kvj@astro.columbia.edu, E-mail: srm4n@virginia.edu [Department of Astronomy, University of Virginia, P.O. Box 400325, Charlottesville, VA 22904 (United States); and others

2012-12-20T23:59:59.000Z

96

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Strategic Plan Print ALS Strategic Plan Update: March 2013 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

97

1992 CBECS Detailed Tables  

Gasoline and Diesel Fuel Update (EIA)

Detailed Tables Detailed Tables To download all 1992 detailed tables: Download Acrobat Reader for viewing PDF files. Yellow Arrow Buildings Characteristics Tables (PDF format) (70 tables, 230 pages, file size 1.39 MB) Yellow Arrow Energy Consumption and Expenditures Tables (PDF format) (47 tables, 208 pages, file size 1.28 MB) Yellow Arrow Energy End-Use Tables (PDF format) (6 tables, 6 pages, file size 31.7 KB) Detailed tables for other years: Yellow Arrow 1999 CBECS Yellow Arrow 1995 CBECS Background information on detailed tables: Yellow Arrow Description of Detailed Tables and Categories of Data Yellow Arrow Statistical Significance of Data 1992 Commercial Buildings Energy Consumption Survey (CBECS) Detailed Tables Data from the 1992 Commercial Buildings Energy Consumption Survey (CBECS) are presented in three groups of detailed tables:

98

1995 Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Households, Buildings & Industry > Commercial Buildings Energy Households, Buildings & Industry > Commercial Buildings Energy Consumption Survey > Detailed Tables 1995 Detailed Tables Data from the 1995 Commercial Buildings Energy Consumption Survey (CBECS) are presented in three groups of detailed tables: Buildings Characteristics Tables, number of buildings and amount of floorspace for major building characteristics. Energy Consumption and Expenditures Tables, energy consumption and expenditures for major energy sources. Energy End-Use Data, total, electricity and natural gas consumption and energy intensities for nine specific end-uses. Summary Table—All Principal Buildings Activities (HTML Format) Background information on detailed tables: Description of Detailed Tables and Categories of Data Statistical Significance of Data

99

Better Buildings Neighborhood Program: Step 3: Develop Plans...  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Workforce Development Step 3: Develop Plans of Action Process Mapping for Problem Solving Austin Energy's detailed planning process was critical to the successful...

100

chapter 5. Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

5. Detailed Tables 5. Detailed Tables Chapter 5. Detailed Tables The following tables present detailed characteristics of vehicles in the residential sector. Data are from the 1994 Residential Transportation Energy Consumption Survey. Table Organization The "Detailed Tables" section consists of three types of tables: (1) Tables of totals such as number of vehicle-miles traveled (VMT) or gallons consumed; (2) tables of per household statistics such as VMT per household; and (3) tables of per-vehicle statistics, such as vehicle fuel consumption per vehicle. The tables have been grouped together by specific topics such as model-year data or family-income data to facilitate finding related information. The Quick-Reference Guide to the detailed tables indicates major topics of each table.

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

1999 CBECS Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Commercial Buildings Energy Consumption Survey (CBECS) > Detailed Tables Commercial Buildings Energy Consumption Survey (CBECS) > Detailed Tables 1999 CBECS Detailed Tables Building Characteristics | Consumption & Expenditures Data from the 1999 Commercial Buildings Energy Consumption Survey (CBECS) are presented in the Building Characteristics tables, which include number of buildings and total floorspace for various Building Characteristics, and Consumption and Expenditures tables, which include energy usage figures for major energy sources. A table of Relative Standard Errors (RSEs) is included as a worksheet tab in each Excel tables. Complete sets of RSE tables are also available in .pdf format. (What is an RSE?) Preliminary End-Use Consumption Estimates for 1999 | Description of 1999 Detailed Tables and Categories of Data

102

Implementation Plan for the Irradiated Materials Characterization Laboratory (IMCL)  

Science Conference Proceedings (OSTI)

This document contains details regarding the planned implementation of the Irradiated Materials Characterization Laboratory at the INL.

Not Listed

2013-04-01T23:59:59.000Z

103

The Woodlands Metro Center energy study. Case studies of project planning and design for energy conservation  

SciTech Connect

Appendix II of The Woodlands Metro Center Energy Study near Houston consists of the following: Metro Center Program, Conventional Plan Building Prototypes and Detail Parcel Analysis, Energy Plan Building Prototypes, and Energy Plan Detail Parcel Analysis.

1980-03-01T23:59:59.000Z

104

Clean Cities: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Tweet about Clean Cities: NewsDetail on Twitter Bookmark Clean Cities: NewsDetail on Google Bookmark Clean Cities: NewsDetail on Delicious Rank Clean Cities: NewsDetail on Digg...

105

Transportation Institutional Plan  

SciTech Connect

This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

1986-08-01T23:59:59.000Z

106

Detailed Test Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Detailed Test Information Detailed Test Information EPA tests vehicles by running them through a series of driving routines, also called cycles or schedules, that specify vehicle speed for each point in time during the laboratory tests. For 2007 and earlier model year vehicles, only the city and highway schedules were used. Beginning with 2008 models, three additional tests will be used to adjust the city and highway estimates to account for higher speeds, air conditioning use, and colder temperatures. Note: EPA has established testing criteria for electric vehicles and plug-in hybrids that are slightly different than those for conventional vehicles. New Tests City Highway High Speed Air Conditioning Cold Temperature Detailed Comparison EPA Federal Test Procedure (City Schedule): Shows vehicle speed (mph) at each second of test

107

Experimental verification of a one-parameter scaling law for the quantum and "classical" resonances of the atom-optics kicked rotor  

E-Print Network (OSTI)

We present experimental measurements of the mean energy in the vicinity of the first and second quantum resonances of the atom optics kicked rotor for a number of different experimental parameters. Our data is rescaled and compared with the one parameter epsilon--classical scaling function developed to describe the quantum resonance peaks. Additionally, experimental data is presented for the ``classical'' resonance which occurs in the limit as the kicking period goes to zero. This resonance is found to be analogous to the quantum resonances, and a similar one-parameter classical scaling function is derived, and found to match our experimental results. The width of the quantum and classical resonance peaks is compared, and their Sub-Fourier nature examined.

Sandro Wimberger; Mark Sadgrove; Scott Parkins; Rainer Leonhardt

2005-02-11T23:59:59.000Z

108

Power Electronics Reliability Kick Off Meeting … Silicon Power Corp. & Sandia Labs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability Reliability Analysis Annual DOE Peer Review Meeting October 8, 2009 Mark A. Smith - Systems Readiness & Sustainment Technologies Department Stan Atcitty - Energy Infrastructure and Distributed Energy Resources Department Sandia National Laboratories Technologies & Customers * Complex Systems Modeling & Simulation * Life Cycle & Total Ownership Costs Analyses * Design for Reliability/Maintainability * Prognostics & Health Management (PHM) * Integrated Logistics Support * Technology Management Optimization * Asset Acquisition & Mission Planning * Risk Assessment & Risk Management Technologies Support Broad Customer Base Automotive Power Electronics Aviation Nuclear Power Coal-Fired Power Petroleum Tools & Technologies Validated Through Broad Use

109

Lesson Plans!  

NLE Websites -- All DOE Office Websites (Extended Search)

you from other teachers, educators, and professionals. These lesson plans are provided free of charge, to help you planning a challenging curriculum that will instill a love of...

110

Medical Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Plans Retiree Medical Insurance Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of medical benefits. Contact Retiree Insurance Providers Medical plan options...

111

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

112

Planning Workshop  

Science Conference Proceedings (OSTI)

Planning Workshop on Renewable Energy and Climate Science for the Americas: Metrology and Technology Challenges. ...

2013-12-05T23:59:59.000Z

113

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

114

Project development plan for East Mesa Geothermal Test Center  

DOE Green Energy (OSTI)

Plans for a test facility for geothermal energy systems and components designed for moderate temperature/low salinity geothermal fluids available at the East Mesa site in the Imperial Valley of California are discussed. Details of the following phases of development are given: technical plan; management plan; procurement and contracting plan; technology transfer and utilization plan; and resource requirements. (JGB)

Not Available

1975-03-01T23:59:59.000Z

115

Environmental Monitoring Plan  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

116

Detailed Course Module Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Course Module Description Course Module Description Module/Learning Objectives Level of Detail in Module by Audience Consumers Gen Ed/ Community College Trades 1. Energy Issues and Building Solutions High High High Learning Objectives: * Define terms of building science, ecological systems, economics of consumption * Relate building science perspective, ecology, social science * Explain historical energy and environmental issues related to buildings * Compare Site and source energy * Examine the health, safety and comfort issues in buildings * Examine the general context for building solutions (zero energy green home with durability as the goal) * Explain a basic overview of alternative energy (total solar flux) - do we have enough energy * Examine cash flow to homeowners

117

Wisconsin Strategic Highway Safety Plan 2011 2013  

E-Print Network (OSTI)

Wisconsin Strategic Highway Safety Plan 2011 ­ 2013 Published by the Wisconsin Department preventable traffic death is one too many Wisconsin Strategic Highway Safety Plan 2011 ­ 2013 Wisconsin Strategic Highway Safety Plan for 2011-2013. This document provides background and details about highway

Sheridan, Jennifer

118

Energy emergency conservation and allocation plan  

SciTech Connect

In 1974 the Minnesota State Legislature directed that an Energy Emergency Conservation and Allocation Plan be prepared for use in the event of an energy supply emergency. The plan is intended to establish priorities of energy usage and to provide conservation actions for reducing energy usage. This report discusses details of the plan.

1977-01-01T23:59:59.000Z

119

Security Plans  

Science Conference Proceedings (OSTI)

... Appendix A Glossary - A glossary of security terms used within the security planning document. ... F, Glossary. None applicable.

2013-09-30T23:59:59.000Z

120

2001 Housing Characteristics Detailed Tables  

U.S. Energy Information Administration (EIA)

2001 Residential Energy Consumption Survey-Housing Characteristics, 2001 Detailed Tables, Energy Information Administration

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Thermal Stabilization Blend Plan  

SciTech Connect

The Blend Plan was written to identify items stored outside of the 213 MBA that will be moved into the MBA for thermal stabilization processing. Product quality oxide items stored in our vaults are found in Appendix A. A table is included in Appendix A which details the isotopic values for the oxide items and calculates the amount of material of any specific run that can be placed in a product can and maintain the 15 watt limit to meet storage vault specifications. This Revision of the Blend Plan adds items of lesser dose rate to lower the exposure of the workers until additional shielding can be added to the gloveboxes.

RISENMAY, H.R.

2000-04-20T23:59:59.000Z

122

Plutonium Vulnerability Management Plan  

Science Conference Proceedings (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

123

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Description: Engineering design image shows a cross-section of part of the planned ITER fusion reaction vessel. Diverter ...

124

EMSL Contribution Plan  

Science Conference Proceedings (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

125

Clean Cities: Clean Cities Financial Opps Details NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Opportunities Printable Version Share this resource Send a link to Clean Cities: Clean Cities Financial Opps Details NewsDetail to someone by E-mail Share Clean Cities:...

126

Early Site Permit Model Program Plan  

Science Conference Proceedings (OSTI)

"The Early Site Permit (ESP) Model Program Plan (MPP)" provides step-by-step guidelines on preparing an ESP application. The Plan identifies work tasks necessary to prepare the application and guides applicants on effectively planning and managing the ESP program, including identifying and managing subcontracted resources. A model program plan details how to prepare applications. The MPP also describes interfaces among tasks and provides a generic schedule for executing the steps in preparing an ESP appl...

2002-06-12T23:59:59.000Z

127

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

128

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

129

I/O Benchmarking Details  

NLE Websites -- All DOE Office Websites (Extended Search)

IO Benchmarking Details IO Benchmarking Details These benchmarks are simply the transfer rate for copying some files from an eliza file system to TMPDIR on a batch node. Each...

130

VEHICLE DETAILS AND BATTERY SPECIFICATIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 of 6 VEHICLE DETAILS AND BATTERY SPECIFICATIONS 1 Vehicle Details Base Vehicle: 2013 Chevrolet Volt VIN: 1G1RA6E40DU103929 Propulsion System: Multi-Mode PHEV (EV, Series,...

131

VEHICLE DETAILS AND BATTERY SPECIFICATIONS  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 VEHICLE DETAILS AND BATTERY SPECIFICATIONS 1 Vehicle Details Base Vehicle: 2011 Chevrolet Volt VIN: 1G1RD6E48BU100815 Propulsion System: Multi-Mode PHEV (EV, Series, and...

132

Decommissioning Planning  

Science Conference Proceedings (OSTI)

The purpose of this EPRI Technical Report is to provide a series of pre-planning guidance documents for the decommissioning of a nuclear power plant. This guidance is based in part upon Nuclear Decommissioning Plans (NDPs) developed by Commonwealth Edison (now Exelon) following the premature closure of Zion Station in 1998 as well as from other industry references and experience. These NDPs focus on the planning activities over the period from prior to final shutdown through the transition period into de...

2006-11-15T23:59:59.000Z

133

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image 150 DPI Image No 300 DPI Version. Title: Frequency Comb, Ultrafast Laser. ...

134

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image 150 DPI Image No 300 DPI Version. Title: Iron-Based Superconductors. Description ...

135

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image 150 DPI Image No 300 DPI Version. Title: Space Weather Forecasts. Description ...

136

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image 150 DPI Image No 300 DPI Version. Title: Organic Solar Power. Description ...

137

Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Plan (SSMP) to be submitted to Congress after the April 2010 release of the Nuclear Posture Review Report. It is aligned with the President's National Security Strategy...

138

Emergency Plans  

Science Conference Proceedings (OSTI)

... Early Dismissal (Early Closing) Due to Inclement Weather - Snow/Ice or Emergency Situation. ... Emergency Situation - "Shelter-in-Place" Plan. ...

2013-02-18T23:59:59.000Z

139

Strategic Petroleum Reserve Plan. Distribution Plan for the Strategic Petroleum Reserve. Amendment No. 3. Energy Action DOE No. 5  

SciTech Connect

Purpose of this Strategic Petroleum Reserve (SPR) Plan Amendment is to provide a Distribution Plan, setting forth the method of drawdown and distribution of the Reserve. Chapter VII of the SPR Plan contained a Distribution Plan which identified and discussed the major objectives, criteria and other factors that will be considered in developing the detailed plan. This Amendment replaces Chapter VII of the SPR Plan in its entirety.

1979-10-01T23:59:59.000Z

140

FY 2007/2008 Contractor Performance Plan, Volume 2  

Science Conference Proceedings (OSTI)

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

FY 2007/2008 Contractor Performance Plan, Volume 1  

SciTech Connect

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

142

Optics Supply Planning System  

Science Conference Proceedings (OSTI)

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

Gaylord, J

2009-04-30T23:59:59.000Z

143

Kick-off presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

the refractory and slag penetration will be considered as faults Consideration of coke formation and loss of catalyst activity as faults in the WGS reactors. Change in the...

144

GRIPS Plan  

DOE Green Energy (OSTI)

The GRIPS (Geothermal Resources Impact Projection Study) Commission was established by a Joint Powers Agreement between the California Counties of Lake, Mendocino, Napa, and Sonoma. The objectives of GRIPS are primarily to develop and use a cooperative environmental data collection and use system including natural, social, and economic considerations to facilitate their independent decisions and those of State and Federal agencies related to the environmental effects of geothermal development. This GRIPS Plan was prepared from a wide range of studies, workshops, and staff analyses. The plan is presented in four parts: summary and introduction; environmental data status report; planned programs; and budget. (MHR)

Not Available

1978-07-31T23:59:59.000Z

145

Public Involvment Plan - Rifle, Colorado  

Office of Legacy Management (LM)

4-TAR 4-TAR MAC-GWRIF 7.1 UMTRA Ground Water Project Public Involvement Plan for the Environmental Assessment of Ground Water Compliance at the New and Old Rifle, Colorado, Uranium Mill Tailings Sites May 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 Public Involvement Plan for the Rifle UMTRA Sites Page 2 Introduction This Public Involvement Plan is tiered to the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project Public Participation Plan dated October 1997. This Public Involvement Plan applies to both the Old and New Rifle, Colorado, UMTRA Project sites and details the activities that have been or will be carried out to meet the public participation requirements of the

146

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image No 150 DPI Version 300 DPI Image. Title: Ultrafast Laser Speeds Up Quest for Atomic Control. ...

147

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. 72 DPI Image 150 DPI Image No 300 DPI Version. Title: House; Trees. Description: *BFRL. Subjects (names): ...

148

NIST Image Gallery: Image Details  

Science Conference Proceedings (OSTI)

... Image Gallery : Image Details. No 72 DPI Version No 150 DPI Version 300 DPI Image. Title: Gold Nano Anchors Put Nanowires in Their Place. ...

149

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

150

Site Tour Security Plan.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

Details for Site Tours Regarding Request for Proposal No. DE-SOL-0001458 Page 1 of 6 SECURITY PLAN The Pantex Plant (Pantex), Y-12 National Security Complex (Y-12), and the Tritium...

151

PRINCETON UNIVERSITY RETIREMENT SAVINGS PLAN Plan Services and Costs  

E-Print Network (OSTI)

. - TIAA-CREF - Vanguard TIAA-CREF Right to Direct Investments You may specify how your future in the Summary Plan Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. By phone at 800 and detailed descriptions of each one is available online at www.tiaa-cref.org/planinvestmentoptions, enter

Rowley, Clarence W.

152

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

153

Savannah River Site Environmental Implementation Plan  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

154

Savannah River Site environmental implementation plan  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

155

Aerocapacitor commercialization plan  

DOE Green Energy (OSTI)

The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

NONE

1995-09-12T23:59:59.000Z

156

FAILED-DETONATION SUPERNOVAE: SUBLUMINOUS LOW-VELOCITY Ia SUPERNOVAE AND THEIR KICKED REMNANT WHITE DWARFS WITH IRON-RICH CORES  

SciTech Connect

Type Ia supernovae (SNe Ia) originate from the thermonuclear explosions of carbon-oxygen (C-O) white dwarfs (WDs). The single-degenerate scenario is a well-explored model of SNe Ia where unstable thermonuclear burning initiates in an accreting, Chandrasekhar-mass WD and forms an advancing flame. By several proposed physical processes, the rising, burning material triggers a detonation, which subsequently consumes and unbinds the WD. However, if a detonation is not triggered and the deflagration is too weak to unbind the star, a completely different scenario unfolds. We explore the failure of the gravitationally confined detonation mechanism of SNe Ia, and demonstrate through two-dimensional and three-dimensional simulations the properties of failed-detonation SNe. We show that failed-detonation SNe expel a few 0.1 M{sub Sun} of burned and partially burned material and that a fraction of the material falls back onto the WD, polluting the remnant WD with intermediate-mass and iron-group elements that likely segregate to the core forming a WD whose core is iron rich. The remaining material is asymmetrically ejected at velocities comparable to the escape velocity from the WD, and in response, the WD is kicked to velocities of a few hundred km s{sup -1}. These kicks may unbind the binary and eject a runaway/hypervelocity WD. Although the energy and ejected mass of the failed-detonation SN are a fraction of typical thermonuclear SNe, they are likely to appear as subluminous low-velocity SNe Ia. Such failed detonations might therefore explain or are related to the observed branch of peculiar SNe Ia, such as the family of low-velocity subluminous SNe (SN 2002cx/SN 2008ha-like SNe).

Jordan, George C. IV; Van Rossum, Daniel R. [Center for Astrophysical Thermonuclear Flashes, University of Chicago, Chicago, IL 60637 (United States); Perets, Hagai B. [Physics Department, Technion, Israel Institute of Technology, Haifa 32000 (Israel); Fisher, Robert T. [Department of Physics, University of Massachusetts Dartmouth, 285 Old Westport Road, North Dartmouth, MA 02740 (United States)

2012-12-20T23:59:59.000Z

157

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

158

Alaska Strategic Energy Plan and Planning Handbook | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the...

159

Environmental Monitoring Program Quality Assurance Project Plan  

SciTech Connect

The Quality Assurance Project Plan (QAPP) is intended to document the quality assurance of the Environmental Monitoring Program. The Quality Assurance Project Plan has two parts and is written to become a chapter in the Environmental Monitoring Plan. Part A describes the management responsibilities and activities performed to assure the quality of the Environmental Monitoring Program. Part B covers the documentation requirements for changes in the Monitoring Program, and provides details on control of the design and implementation of quality assurance activities.

Holland, R.C.

1993-06-01T23:59:59.000Z

160

Business Plan in Brief : Draft.  

SciTech Connect

Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

United States. Bonneville Power Administration.

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

162

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

163

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

164

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

165

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

166

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

167

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

168

2003 CBECS Detailed Tables: Summary  

U.S. Energy Information Administration (EIA) Indexed Site

2003 Detailed Tables 2003 Detailed Tables 2003 CBECS Detailed Tables most recent available Released: September 2008 Building Characteristics | Consumption & Expenditures | End-Use Consumption In the 2003 CBECS, the survey procedures for strip shopping centers and enclosed malls ("mall buildings") were changed from those used in previous surveys, and, as a result, mall buildings are now excluded from most of the 2003 CBECS tables. Therefore, some data in the majority of the tables are not directly comparable with previous CBECS tables, all of which included mall buildings. Some numbers in the 2003 tables will be slightly lower than earlier surveys since the 2003 figures do not include mall buildings. See "Change in Data Collection Procedures for Malls" for a more detailed explanation.

169

Research experiments detailed design review  

DOE Green Energy (OSTI)

The illustrations for the detailed design review of the heliostats for a solar thermal pilot plant are presented. Also included are the program schedule, meeting agenda, and component design features. (MHR)

Not Available

1976-01-01T23:59:59.000Z

170

Advanced Manufacturing Office: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: NewsDetail on Twitter Bookmark Advanced Manufacturing Office: NewsDetail on Google Bookmark Advanced Manufacturing Office: NewsDetail on Delicious Rank Advanced...

171

Building Technologies Office: Buildings NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

NewsDetail on Twitter Bookmark Building Technologies Office: Buildings NewsDetail on Google Bookmark Building Technologies Office: Buildings NewsDetail on Delicious Rank Building...

172

Building Technologies Office: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: NewsDetail on Twitter Bookmark Building Technologies Office: NewsDetail on Google Bookmark Building Technologies Office: NewsDetail on Delicious Rank Building...

173

EERE Postdoctoral Research Awards: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

NewsDetail on Twitter Bookmark EERE Postdoctoral Research Awards: NewsDetail on Google Bookmark EERE Postdoctoral Research Awards: NewsDetail on Delicious Rank EERE...

174

Standby gasoline rationing plan: narrative  

SciTech Connect

The objectives of the rationing plan are to provide a mechanism capable of maintaining an orderly and equitable market for gasoline in a severe supply shortfall, and capable of rapid implementation; and to comply with requirements of EPCA, which mandates the development of a contingency rationing plan. Eligibility for ration allotments will be based principally on motor vehicle registration records, maintained in a national vehicle registration file. Supplemental allotments will be granted for certain priority activities to ensure the maintenance of essential public services. Supplemental allotments will also be granted to businesses and government organizations with significant off-highway gasoline requirements. Local rationing boards or other offices will be established by states, to provide special allotments to hardship applicants, within DOE guidelines. The background and history of the plan are described. The gasoline rationing plan operations, government operations, program costs, staffing, and funding are also detailed in this report. (MCW)

1979-02-01T23:59:59.000Z

175

Level-of-Detail Shaders  

E-Print Network (OSTI)

Current graphics hardware can render objects using simple procedural shaders in real-time. However, detailed, highquality shaders will continue to stress the resources of hardware for some time to come. Shaders written for film production and software renderers may stretch to thousands of lines. The difficulty of rendering efficiently is compounded when there is not just one, but a scene full of shaded objects, surpassing the capability of any hardware to render. This problem has many similarities to the rendering of large models, a problem that has inspired extensive research in geometric level-of-detail and geometric simplification. We introduce an analogous process for shading, shader simplification. Starting from an initial detailed shader, shader simplification produces a new shader with extra level-of-detail parameters that control the shader execution. The resulting level-of-detail shader, can automatically adjust its rendered appearance based on measures of distance, size, or importance as well as physical limits such as rendering time budget or texture usage.

Marc Olano; Bob Kuehne

2003-01-01T23:59:59.000Z

176

Shot Planning and Analysis Tools  

SciTech Connect

Shot planning and analysis tools (SPLAT) integrate components necessary to help achieve a high over-all operational efficiency of the National Ignition Facility (NIF) by combining near and long-term shot planning, final optics demand and supply loops, target diagnostics planning, and target fabrication requirements. Currently, the SPLAT project is comprised of two primary tool suites for shot planning and optics demand. The shot planning component provides a web-based interface to selecting and building a sequence of proposed shots for the NIF. These shot sequences, or 'lanes' as they are referred to by shot planners, provide for planning both near-term shots in the Facility and long-term 'campaigns' in the months and years to come. The shot planning capabilities integrate with the Configuration Management Tool (CMT) for experiment details and the NIF calendar for availability. Future enhancements will additionally integrate with target diagnostics planning and target fabrication requirements tools. The optics demand component is built upon predictive modelling of maintenance requirements on the final optics as a result of the proposed shots assembled during shot planning. The predictive models integrate energetics from a Laser Performance Operations Model (LPOM), the status of the deployed optics as provided by the online Final Optics Inspection system, and physics-based mathematical 'rules' that predict optic flaw growth and new flaw initiations. These models are then run on an analytical cluster comprised of forty-eight Linux-based compute nodes. Results from the predictive models are used to produce decision-support reports in the areas of optics inspection planning, optics maintenance exchanges, and optics beam blocker placement advisories. Over time, the SPLAT project will evolve to provide a variety of decision-support and operation optimization tools.

Casey, A; Beeler, R; Conder, A; Fallejo, R; Flegel, M; Hutton, M; Jancaitis, K; Lakamsani, V; Potter, D; Reisdorf, S; Tappero, J; Whitman, P; Carr, W; Liao, Z

2011-07-25T23:59:59.000Z

177

Energy planning and management plan  

Science Conference Proceedings (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

178

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

179

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

180

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

1988-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Transit planning in metropolitan Seattle: a historical perspective. Final report  

SciTech Connect

The document provides a historical overview of trends in transit planning to casing on the experiences of Seattle, Washington as a case study. It focuses on the period from the 1940's to the present, detailing major transit initiatives and the planning process which led to them. The document includes a detailed chronological review of events affecting transportation planning, both in Seattle and nationwide.

Malm, R.

1986-04-01T23:59:59.000Z

182

Berkeley Lab Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Development (LDRD) BER Review Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links Strategic Planning Laboratory Directed Research and...

183

Plan Descriptions & Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Descriptions & Summaries Retiree Insurance Plans Retiree health and welfare benefits are managed by AonHewitt and Associates. Contact Retiree Insurance Providers Plan...

184

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence...

185

New Details of Ferroelectric Switching  

NLE Websites -- All DOE Office Websites (Extended Search)

New Details of Ferroelectric Switching New Details of Ferroelectric Switching All of our current information technology relies on devices that process information as binary ones and zeroes. Ferroelectric materials are of special interest to developers of the next generation of such devices because they exhibit polarized electronic states that can represent bits of information. Moreover, these materials retain their polarization states without consuming electrical power, making ferroelectrics the subject of intense study for nonvolatile memory applications in which data is stored even when the power is turned off. One problem, however, is polarization fatigue: after a number of cycles, the switchable polarization begins to taper off, rendering the device unusable. Recently, a team of researchers

186

Electric Power detailed State data  

U.S. Energy Information Administration (EIA) Indexed Site

Detailed State Data Detailed State Data Annual data for 2012 Release Date: November 12, 2013 Next Release Date: November 2014 Revision/Corrections Annual data format 1990 - 2012 Net Generation by State by Type of Producer by Energy Source (EIA-906, EIA-920, and EIA-923)1 XLS 1990 - 2012 Fossil Fuel Consumption for Electricity Generation by Year, Industry Type and State (EIA-906, EIA-920, and EIA-923)2 XLS 1990 - 2011 Existing Nameplate and Net Summer Capacity by Energy Source, Producer Type and State (EIA-860)1, 3 XLS 2011 - 2016 Proposed Nameplate and Net Summer Capacity by Year, Energy Source, and State (EIA-860)1 XLS 1990 - 2011 U.S. Electric Power Industry Estimated Emissions by State (EIA-767, EIA-906, EIA-920, and EIA-923)4 XLS 1990 - 2012 Average Price by State by Provider (EIA-861)5 XLS

187

Flight Plan  

E-Print Network (OSTI)

Developing broader linguistic capability and cultural understanding iscritical to prevail in the long war and meet 21 st Century challenges. The Department must dramatically increase the number of personnel proficient in key languagesand make these languages available at all levels of action and decision from the strategic to the tactical. 2006 Quadrennial Defense Review, p. 78 Due to the nature of immediate and likely future challenges, our Joint forces require Airmen capable of influencing the outcomes of US, allied, and coalition operations anywhere in the world. While we, the Air Force, have made considerable initial progress toward building the necessary cross-cultural skills, we recognize the existing processes for obtaining this forceenhancing capability (appropriate culture, region, language and negotiation skills) are not currently mature or robust enough to optimally meet immediate expectations or near-future requirements. Therefore, it is imperative that we tailor our cultural, regional, and language competency development to maximize our efforts and meet Air Force and Joint requirements informed by National guidance. To this end, the Air Force Culture, Region, and Language (CRL) Flight Plan represents our framework for implementing relevant National Security and National Defense strategies via Air Force programs. The dynamic global environment has made Cross-Cultural Competence a critical and necessary capability for the Total Force. The Air Force CRL Flight Plan supports the

unknown authors

2009-01-01T23:59:59.000Z

188

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

189

TWRS Systems Engineering Working Plan  

SciTech Connect

The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

Eiholzer, C.R.

1994-09-16T23:59:59.000Z

190

Part 5: For Detailed Information | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: For Detailed Information 5: For Detailed Information Part 5: For Detailed Information 42 U.S.C. §9601 et. seq., The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) 40 CFR Part 300, National Oil and Hazardous Substance Pollution Contingency Plan (NCP) (March 1990) Executive Order 12580: Superfund Implementation DOE Order 5400.4: CERCLA Requirements Policy on Decommissioning of Department of Energy Facilities Under CERCLA (May 22, 1995) Decommissioning Implementation Guide (May 1995) Guidance on Accelerating CERCLA Environmental Restoration at Federal Facilities (August 1994) This question and Answer Sheet is designed to provide answers to common questions regarding decommissioning under CERCLA. If you have questions or

191

SunShot Initiative: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

SunShot Initiative: NewsDetail on Twitter Bookmark SunShot Initiative: NewsDetail on Google Bookmark SunShot Initiative: NewsDetail on Delicious Rank SunShot Initiative:...

192

Solid-State Lighting: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Lighting: NewsDetail on Twitter Bookmark Solid-State Lighting: NewsDetail on Google Bookmark Solid-State Lighting: NewsDetail on Delicious Rank Solid-State Lighting:...

193

Fuel Cell Technologies Office: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

Office: NewsDetail on Twitter Bookmark Fuel Cell Technologies Office: NewsDetail on Google Bookmark Fuel Cell Technologies Office: NewsDetail on Delicious Rank Fuel Cell...

194

Cogeneration Planning  

E-Print Network (OSTI)

Cogeneration, the sequential use of a fuel to generate electricity and thermal energy, has become a widely discussed concept in energy engineering. American-Standard, a world-wide diversified manufacturing corporation, has actively been pursuing cogeneration projects for its plants. Of concern to us are rapidly escalating electrical costs plus concern about the future of some utilities to maintain reserve capacity. Our review to date revolves around (1) obtaining low-cost reliable fuel supplies for the cogeneration system, (2) identifying high cost/low reserve utilities, and (3) developing systems which are base loaded, and thus cost-effective. This paper will be an up-to-date review of our cogeneration planning process.

Mozzo, M. A. Jr.

1985-05-01T23:59:59.000Z

195

Thermal Stabilization Blend Plan  

SciTech Connect

The Blend Plan was written to identify items stored outside of the 213 MBA that will be moved into the MBA for thermal stabilization processing. Product quality oxide items stored in our vaults are found in Appendix B. A table is included in Appendix B which details the isotopic values for the oxide items and calculates the amount of material of any specific run that can be placed in a product can and maintain the 15 watt limit to meet storage vault specifications. There is no chance of exceeding the 15 watt limit with items starting with the designations ''LAO'' or ''PBO.'' All items starting with the designations ''BO,'' ''BLO,'' and ''DZ0'' are at risk of exceeding the 15 watt specification if the can were to be filled.

RISENMAY, H.R.

1999-08-19T23:59:59.000Z

196

Show details for [Energy Storage III: Materials ...  

Science Conference Proceedings (OSTI)

Show details for [ACerS ACerS Arthur L. Friedberg Memorial Lecture. Show details for [ACerS ACerS Cooper Award...

197

BISICLES Captures Details of Retreating Antarctic Ice  

NLE Websites -- All DOE Office Websites (Extended Search)

BISICLES Captures Details of Retreating Antarctic Ice BISICLES Captures Details of Retreating Antarctic Ice March 30, 2013 | Tags: Climate Research, Hopper, Math & Computer Science...

198

ESnet Program Plan  

Science Conference Proceedings (OSTI)

The purpose of the Energy Sciences Network (ESnet) Program Plan is to establish, demonstrate, and represent the vision and recommendations of the ESnet Steering Committee regarding ESnet directions and implementations. This document is intended to assist the Office of Energy Research and the Scientific Computing Staff in ESnet program planning and management, including ESnet prioritization and funding. This document contains general information about ESnet in terms of both the current and future needs of Energy Research programs for networking infrastructure. Some historical information about Energy Research networking is provided to afford the reader a perspective from which to evaluate the increasing utility of networking to the Energy Research community. A current ESnet description is provided in detail. ESnet is one of the world's major scientific networks, and the information contained within this document will provide an understanding of ESnet architecture and major components. ESnet provides the Energy Research community with access to many other peer level networks and a multitude of other interconnected network facilities. The reader will be provided with information concerning ESnet's connectivity and interrelationship to other networks and facilities.

Not Available

1991-03-01T23:59:59.000Z

199

SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN  

SciTech Connect

This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

2012-11-26T23:59:59.000Z

200

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Fiscal year 1987 program plan  

SciTech Connect

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

1986-12-01T23:59:59.000Z

202

STRATEGIC PLANNING  

E-Print Network (OSTI)

The National Academy of Public Administration is an independent, nonprofit organization chartered by Congress to improve governance at all levelslocal, regional, state, national, and international. The Academys membership of more than 550 Fellows includes current and former members of Congress, cabinet-level appointees, senior federal executives, state and local practitioners, businesspeople, nonprofit leaders, and scholars with distinguished records in public management. Since its establishment in 1967, the Academy has assisted hundreds of federal agencies, congressional committees, state and local governments, civic organizations, and institutions overseas through problemsolving, research, analysis, information sharing, developing strategies for change, and connecting people and ideas. Most reports and papers issued by Academy panels respond to specific requests and needs of public agencies. Projects also address governmentwide and broader societal topics identified by the Academy. In addition to government institutions, the Academy is also supported by businesses, foundations, and nonprofit organizations. A Final Report by a Panel of the NATIONAL ACADEMY OF PUBLIC ADMINISTRATION for the Office of Strategic Planning

Hale Champion; Mary Jane England; Harry Hatry

2001-01-01T23:59:59.000Z

203

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

204

Metal Detectives: New Book Details Titanic Investigation  

Science Conference Proceedings (OSTI)

Metal Detectives: New Book Details Titanic Investigation. For Immediate Release: April 15, 2008. ...

2012-10-02T23:59:59.000Z

205

CMC Bench Scale Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 3.5 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed this test plan with technical assistance from ceramic scientists at the Dept. of Energy Oak Ridge National Laboratory and Albany Research Center who will perform the environmental exposure tests.

Mark Fitzsimmons; Gerard Pelletier; Dave Grimmett

2006-05-30T23:59:59.000Z

206

Microsoft Word - CI_Plan_2006.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Involvement Plan for Brookhaven National Laboratory Involvement Plan for Brookhaven National Laboratory Prepared by: Brookhaven National Laboratory Community, Education, Government and Public Affairs Originally published April 15, 1999 Updated September 30, 2005 Community Involvement Plan for Brookhaven National Laboratory 2 A MESSAGE FROM THE DIRECTOR The Brookhaven National Laboratory Community Involvement Plan is part of a systematic effort to increase awareness of the community in our operations. The plan spells out, in detail, the process the Laboratory will follow to ensure that the views of the internal and external communities are considered in its decision-making processes, where appropriate, and that these communities are kept informed about issues and upcoming decisions. The overarching goal of Brookhaven's Community

207

LANS DB PENSION PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

208

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600 Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared, safety, and welfare. #12;ACKNOWLEDGEMENTS The Energy Emergency Response Plan was prepared from

209

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Officer Biological (Accident Reports) 2204 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN (CHP) (4/2007) 1

Oliver, Douglas L.

210

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN

Kim, Duck O.

211

NETL: Gasifipedia - Gasification in Detail  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Gasifiers Commercial Gasifiers Types of Gasifiers Although there are various types of gasifers (gasification reactors), different in design and operational characteristics, there are three main gasifier classifications into which most of the commercially available gasifiers fall. These categories are as follows: Fixed-bed gasifiers (also referred as moving-bed gasifiers) Entrained-flow gasifiers Fluidized-bed gasifiers Commercial gasifiers of GE Energy, ConocoPhillips E-Gas(tm) and Shell SCGP are examples of entrained-flow types. Fixed-or moving-bed gasifiers include that of Lurgi and British Gas Lurgi (BGL). Fluidized-bed gasifiers include the catalytic gasifier technology being commercialized by Great Point Energy, the Winkler gasifier, and the KBR transport gasifiers. For more specific information on these gasifiers, follow the links for the bulleted gasifier types above. NOTE: Although specific gasifiers named above are described in detail throughout this website, it is realized that other gasification technologies exist. The gasifiers discussed herein were not preferentially chosen by NETL.

212

Accumulated waste characterization work plan  

Science Conference Proceedings (OSTI)

The Portsmouth Gaseous Diffusion Plant (PORTS) as part of the uranium enrichment complex produces enriched uranium for power generation and defense purposes. Since the beginning of diffusion plant operations in 1953, a variety of waste materials and excess equipment has been generated through both normal operations and as part of major system upgrade programs. However, as a result of the closure of former onsite radioactive management facilities and limited onsite and offsite disposal facilities for mixed (hazardous and radioactive) wastes, PORTS has accumulated large quantities of waste awaiting final disposition. These accumulated wastes were estimated in the Accumulated Waste Plan (AWP) to consist of some 21,700 containers of the radioactive, RCRA hazardous, PCB, mixed and asbestos wastes in various storage areas and process buildings with PORTS. In order to proper manage these wastes onsite and prepare for them for ultimate treatment or disposal, a detailed understanding of the waste contents and characteristics must be developed. The strategy for managing and disposing of these wastes was outlined in the AWP. The purpose of this Accumulated Waste Characterization Work Plan (AWCWP) is to provide a detailed plan for characterizing waste containers from the existing PORTS inventory. The AWCWP documents the process and analytical information currently available and describes statistically-based sampling and analyses required to support proper regulatory classification.

Not Available

1992-01-01T23:59:59.000Z

213

Ice-making heat exchanger evaluation and test plan  

DOE Green Energy (OSTI)

Several approaches to making ice for district cooling are identified and their current status discussed. Recommendations for future work are given, with a detailed plan for one phase of the work. 13 refs., 5 figs.

Andrews, J.W.; Leigh, R.W.; Piraino, M.W.

1990-01-01T23:59:59.000Z

214

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

DOESC Scientific Facilities Strategic Plan (20 years, major capital projects) * DOE Strategic Plan (7-10 years) * DOE (HEP)Fermilab Strategic Plan (10 years) * FRAFNAL Plan for...

215

NSLS Work Planning & Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Planning & Controls NSLS Work Planning and Control Procedure Lead Working Guidelines Information on Working in Areas Subject to Radiation from VUV Injection Procedure for...

216

NEHRP - Final Plan Development  

Science Conference Proceedings (OSTI)

... However, NEHRP funds do not support targeted ... FEMA does provide linkage of ongoing work in ... Plan discussion about Strategic Planning Principles ...

217

Light duty utility arm startup plan  

SciTech Connect

This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).

Barnes, G.A.

1998-09-01T23:59:59.000Z

218

BROOKHAVEN SCIENCE ASSOCIATES, LLC RETIREMENT PLAN  

E-Print Network (OSTI)

providers: - TIAA-CREF - Fidelity Investments TIAA-CREF Right to Direct Investments You may specify how your as described in the Summary Plan Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. A current list of investment options and detailed descriptions of each one is available online at www.tiaa

Johnson, Peter D.

219

Powering the people: India's capacity expansion plans  

Science Conference Proceedings (OSTI)

India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

Patel, S.

2009-05-15T23:59:59.000Z

220

VEHICLE DETAILS, BATTERY DESCRIPTION AND SPECIFICATIONS Vehicle...  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 VEHICLE DETAILS, BATTERY DESCRIPTION AND SPECIFICATIONS Vehicle Details Base Vehicle: 2011 Nissan Leaf VIN: JN1AZ0CP5BT000356 Propulsion System: BEV Electric Machine: 80 kW...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Savannah River Site environmental implementation plan. Volume 1, Executive summary  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

222

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

223

Underground storage tank management plan  

Science Conference Proceedings (OSTI)

The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

NONE

1994-09-01T23:59:59.000Z

224

INDIVIDUAL DEVELOPMENT PLAN JOB AID  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDIVIDUAL DEVELOPMENT PLAN JOB AID INDIVIDUAL DEVELOPMENT PLAN JOB AID Log into to ESS>Click the IDP drop down menu>Click Start Page Click on "Create a new IDP" NOTE: This screen also gives you the option to change supervisors, view, update and rollover your IDP. Your initial IDP will be (blank) in the goal column for your 3 Short Range and Long Range goals, so click on the word/link (Modify) to enter goals. Enter your Goal in the box below>Click Save This window will appear>Click on one of the Activity boxes below to enter an activity. You can add more than one activity per goal. This window will appear so you can enter the detailed information for your activities. You can select one of the 3 save options on the bottom. To View your IDP>Click on View current IDP (example is below this screen

225

Oracle accrual plans from requirements to implementation  

SciTech Connect

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

Rivera, Christine K [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

226

National Security Technology Incubator Operations Plan  

Science Conference Proceedings (OSTI)

This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

None

2008-04-30T23:59:59.000Z

227

Experimental Test Plan DOE Tidal and River Reference Turbines  

Science Conference Proceedings (OSTI)

Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

2012-09-01T23:59:59.000Z

228

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

229

Guidance for Planning Exercises  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

230

Applying DSM evaluation results to utility planning  

SciTech Connect

This paper describes the results of a study to assess the application of DSM evaluation results to utility forecasting and planning. The paper has three objectives: (1) identify forecasting and planning applications of evaluation studies, (2) identify major obstacles and problems associated with applying evaluation results to forecasting and planning, and (3) suggest approaches to address the major problems. The paper summarizes results from interviews with utilities, regulators, and consultants to determine how the utility industry currently applies evaluation results in forecasting and planning. The paper also includes results from a detailed case study of Sacramento Municipal Utility District (SMUD) and Southern California Edison Company (SCE), two utilities with large DSM programs and active evaluation efforts.

Baxter, L.W.

1995-07-01T23:59:59.000Z

231

Idaho National Laboratory Environmental Monitoring Plan  

SciTech Connect

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2008-04-01T23:59:59.000Z

232

National Security Technology Incubator Action Plan  

SciTech Connect

This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

2008-02-28T23:59:59.000Z

233

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2012-08-01T23:59:59.000Z

234

Idaho National Laboratory Site Environmental Monitoring Plan  

Science Conference Proceedings (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2010-10-01T23:59:59.000Z

235

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Clinical Engineering 2964 #12;TABLE OF CONTENTS CHEMICAL HYGIENE

Oliver, Douglas L.

236

Microsoft Word - prjct planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

237

Better rural churches through architectural planning  

E-Print Network (OSTI)

The purpose of this thesis is to show that Protestant rural churches can be batter churches by combining religious and sociological planning with proper architectural planning. Architectural planning as presented in this thesis is a technique by which the needs and requirements or the proposed new rural church nay be translated into workable architectural drawings. Part of this technique is an analysis of building requirements and is called "Programming". Programming is not a complete answer to all the problems of the rural church nor will it always result in a perfect church building, but it can be a vary important tool by which a more functional and batter integrated building can be planned. This thesis will also attempt to clarify the role of the architect in the architectural planning of the rural church. An architect is a specially trained person and his services should be of use to rural as well as urban churches. It is not intended that this thesis give specific or detailed solutions to architectural planning, because each new church will present individual problems find conditions which belong solely to that church, its particular location and its denomination. The intent or this thesis is to help clarify the approach to architectural planning and to make programming easier for rural people.

Robinson, K. Frank

1956-01-01T23:59:59.000Z

238

Ground water protection management program plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

239

2005 RECS Consumption and Expenditures Detailed Tables  

U.S. Energy Information Administration (EIA)

Detailed Consumption and Expenditures (C&E) tables containing Space Heating, Air-Conditioning, Water Heating, and Appliance residential energy data are now available.

240

High Precision Geophysics & Detailed Structural Exploration ...  

Open Energy Info (EERE)

icon High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling Geothermal Project Jump to: navigation, search Last modified on July 22, 2011....

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Wellness Planning Session Report  

E-Print Network (OSTI)

Wellness Planning Session Report September 12, 2008 #12;Wellness Planning Session Report Printed.............................................................................1 Explored what wellness program should look like at NMSU .......................2 Considered for the Wellness committee..................................2 Identified the next meeting date and meeting agenda

Castillo, Steven P.

242

Strategic Planning History  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy for Global Change Research Related Federal Climate Efforts Strategic Planning History Print E-mail Below is a timeline of past strategic plans that have guided The U.S....

243

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

244

Business Continuity Planning  

Science Conference Proceedings (OSTI)

This article considers various strategies for protecting an organisation from both natural and man-made disasters. The differences between business continuity planning, and disaster recovery planning are recognised. 1997 John Wiley & Sons, ...

Martin Nemzow

1997-07-01T23:59:59.000Z

245

Hydrogen Posture Plan  

Fuel Cell Technologies Publication and Product Library (EERE)

The Hydrogen Posture Plan, published in December 2006, outlines a coordinated plan for activities under the Hydrogen Fuel Initiative, both at the Department of Energy and the Department of Transportat

246

RM Capital Investment Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

247

EM Five-Year Plan (FY 2008 - FY 2012) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) The purpose of the EM Five Year Plan is to describe EM's planned strategies, funding and accomplishments over the next five years. This plan summarizes EM progress to date, presents EM performance measures, discusses assumptions and the EM decision-making process, and provides estimated EM funding over the FY 2008-2012 time period. Following this summary are sections that provide detailed information on each site including planned accomplishments at the target funding scenario. EM's five year planning targets are significantly different from the funding targets that appeared in the FY 2007-2011 Five Year Plan. Site planning allocations that formed the basis for the planned accomplishments

248

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

1995-03-03T23:59:59.000Z

249

Geothermal Energy Multi-Year Program Plan, FY 1994-1998  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

1993-04-01T23:59:59.000Z

250

U.S. Department of Energy Office of Inspector General fiscal year 1999 annual performance plan  

SciTech Connect

This plan is published pursuant to requirements of the Government Performance and Results Act of 1993. The plan outlines the goals, objectives, and strategies that the Office of Inspector General intends to implement and execute in FY 1999. The plan also includes the details of this office`s efforts to continually improve customer service.

NONE

1998-10-01T23:59:59.000Z

251

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a ``lower tier`` document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1997-12-09T23:59:59.000Z

252

Draft 2013 Annual Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft 2013 Annual Plan Draft 2013 Annual Plan Section 999: Draft 2013 Annual Plan Section 999 - Draft 2013 Annual Plan...

253

HR Fundamentals Retirement Plans  

E-Print Network (OSTI)

FY 12-13 #12;Professional & Faculty Retirement · TIAA/CREF · Defined Contribution Retirement Plan 401 & State Taxes are deferred · Immediate Vesting · www.tiaa-cref.org (800) 842-2776 FY 12-13 #12;TIAA - Public Employee's Retirement System "Defined Contribution Plan" 3) TIAA/CREF ­ Defined Contribution Plan

Dyer, Bill

254

Sandia Strategic Plan 1997  

SciTech Connect

Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

1997-12-01T23:59:59.000Z

255

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004  

SciTech Connect

The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

Pearson, Erik W.

2000-03-01T23:59:59.000Z

256

Pacific Northwest National Laboratory Institutional Plan FY 2001-2005  

SciTech Connect

The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

Fisher, Darrell R.; Pearson, Erik W.

2000-12-29T23:59:59.000Z

257

Recommendations for a US geothermal research plan. Volume 1  

DOE Green Energy (OSTI)

A multidisciplinary study team developed a comprehensive research program. Five- and ten-year program plans emphasize critical five-year milestones. Recommended plans are presented here under constraint of three different five-year budgets: $100, $300 and $500 million, respectively. Plans are detailed in six resource subprograms: high temperature water, moderate temperature water, hot dry rock, brine, geopressured, and dry steam. Also presented are plans for five subprograms common to all geothermal resources: exploration, assessment, drilling technology, environmental-social, and institutional. (MHR)

Burnham, J.B.; Bloomster, C.H.; Cohn, P.D.; Eliason, J.R.; Peterson, P.L.; Rohrmann, C.A.; Sandness, G.A.; Stewart, D.H.; Wallace, R.W.

1975-12-01T23:59:59.000Z

258

Pacific Northwest National Laboratory Institutional Plan FY 2001-2005  

SciTech Connect

The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

Fisher, Darrell R.; Pearson, Erik W.

2000-12-29T23:59:59.000Z

259

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004  

SciTech Connect

The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

Pearson, Erik W.

2000-03-01T23:59:59.000Z

260

Los Alamos National Laboratory emergency management plan. Revision 1  

SciTech Connect

The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

Ramsey, G.F.

1998-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Conceptual Design Plan SM-43 Replacement Project  

SciTech Connect

The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

University of California, Los Alamos National Laboratory, SCC Project Office

2000-11-01T23:59:59.000Z

262

Conversion Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conversion Plan Conversion Plan This template is used to document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation...

263

Institutional Plan FY 2003 - 2007  

E-Print Network (OSTI)

III. LABORATORY STRATEGIC PLAN DOE Program Focus on ResultsInstitutional Plan addresses the strategic goals of DOE andbelow does not support those elements of the strategic plan

Chartock, Michael; Hansen, Todd

2002-01-01T23:59:59.000Z

264

Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home About Us Strategic Plan Strategic Plan Leadership Budget Our Organization Strategic Plan Careers Our...

265

Training Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

266

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

267

Institutional plan. FY 1998--2003  

SciTech Connect

This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

1997-07-01T23:59:59.000Z

268

Report: EM Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

269

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

1997-10-01T23:59:59.000Z

270

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

271

DOE Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Certifications and Professional Development Real Estate History DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration...

272

N reactor standby program plan: Part 3, Standby and surveillance  

Science Conference Proceedings (OSTI)

The N Reactor Standby Program Summary Plan is a description of the general policy and guidelines to be followed in placing the N Reactor in cold standby status. That Plan defines a number of objectives and activities necessary to achieve this goal. One of these activities is to layup the N Reactor operating systems in a cost-effective manner such that its safe restart may be assured. The Program Summary Plan has defined this activity as Standby and Surveillance and has directed that a Standby and Surveillance Program Plan be prepared to define and plan all of the activities necessary to accomplish this objective. This Plan responds to that commitment and supports the related policies and guidelines contained in the referenced Plan. In a manner similar to the referenced Program Plan, the Standby and Surveillance Program Plan is a description of the policies, guidelines, and methods of implementation to layup the N Reactor systems for cold standby. Accordingly, this Plan: Provides mission and objectives to guide system layup activities; Provides assumptions and criteria for layup; Defines the methodology for formulating the Program; Defines Program Baselines; Defines the method of performance of the Program; Provides for management, administrative control, and reporting requirements. Supporting details to these major elements of the Standby and Surveillance Program Plan are contained in the following sections.

NONE

1988-08-01T23:59:59.000Z

273

Exposure Reduction Through Optimized Planning and Scheduling  

Science Conference Proceedings (OSTI)

The industry is challenged with increasing material inspections and complex maintenance work in areas with high radiation fields. Compounding this problem is the drive to reduce worker exposure. Efficient job planning and monitoring of worker exposure becomes more important in light of these challenges. An essential component of the ALARA program is centered on accurate and detailed work control. Drawing on industry experience, best practices, and the experience of the EPRI ALARA assessment team, EPRI de...

2005-12-14T23:59:59.000Z

274

Detailed stress tensor measurements in a centrifugal compressor vaneless diffuser  

Science Conference Proceedings (OSTI)

Detailed flow measurements have been made in the vaneless diffuser of a large low-speed centrifugal compressor using hot-wire anemometry. The three time mean velocity components and full stress tensor distributions have been determined on eight measurement plans within the diffuser. High levels of Reynolds stress result in the rapid mixing out of the blade wake. Although high levels of turbulent kinetic energy are found in the passage wake, they are not associated with strong Reynolds stresses and hence the passage wake mixes out only slowly. Low-frequency meandering of the wake position is therefore likely to be responsible for the high kinetic energy levels. The anisotropic nature of the turbulence suggests that Reynolds stress turbulence models are required for CFD modeling of diffuser flows.

Pinarbasi, A.; Johnson, M.W. [Univ. of Liverpool (United Kingdom). Dept. of Mechanical Engineering

1996-04-01T23:59:59.000Z

275

Property Types, Definitions, and Use Detail  

NLE Websites -- All DOE Office Websites (Extended Search)

Types, Definitions, and Use Details Types, Definitions, and Use Details The property types listed on pages 1 through 7 are eligible to receive the 1-100 ENERGY STAR score. The Use Details marked with an asterisk are required in order to receive a score. Portfolio Manager now contains more than 80 property types to choose from when setting up your property, in order to best identify the primary use of your property. Although the building types for which the 1-100 ENERGY STAR score is currently available will not change, the expanded list of property types that can be selected will offer users more specific and accurate categorization for comparison. See below for the full list of property types available in Portfolio Manager, along with their definitions and the property use details that you will need to enter.

276

CBECS 1992 - Building Characteristics, Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Detailed Tables Detailed Tables Detailed Tables Percent of Buildings and Floorspace by Census Region, 1992 Percent of Buildings and Floorspace by Census Region, 1992 The following 70 tables present extensive cross-tabulations of commercial buildings characteristics. These data are from the Buildings Characteristics Survey portion of the 1992 CBECS. The "Quick-Reference Guide," indicates the major topics of each table. Directions for calculating an approximate relative standard error (RSE) for each estimate in the tables are presented in Figure A1, "Use of RSE Row and Column Factor." The Glossary contains the definitions of the terms used in the tables. See the preceding "At A Glance" section for highlights of the detailed tables. Table Organization

277

Geometry-aware framebuffer level of detail  

Science Conference Proceedings (OSTI)

This paper introduces a framebuffer level of detail algorithm for controlling the pixel workload in an interactive rendering application. Our basic strategy is to evaluate the shading in a low resolution buffer and, in a second rendering pass, resample ...

Lei Yang; Pedro V. Sander; Jason Lawrence

2008-06-01T23:59:59.000Z

278

A Computationally Efficient Approach using Detailed Chemical...  

NLE Websites -- All DOE Office Websites (Extended Search)

Detailed Chemical Kinetics in Multidimensional Simulation of HCCI and PCCI Engine Combustion Speaker(s): Dan Flowers Date: April 27, 2007 - 12:00pm Location: 90-191 Seminar...

279

Property:Project Details | Open Energy Information  

Open Energy Info (EERE)

Details Details Jump to: navigation, search Property Name Project Details Property Type Text Pages using the property "Project Details" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + Aquamarine Power is developing its first commercial 40MW Oyster wave farm off the north-west coast of Lewis in Scotland. The company was granted an exclusive option on the site by UK seabed owner The Crown Estate in May 2011. MHK Projects/ADM 3 + 1/4 scale model MHK Projects/ADM 4 + Shore based PTO test MHK Projects/ADM 5 + Framework 7 program of the European Union MHK Projects/AW Energy EMEC + AW Energy successfully demonstrated a 1:3 scale prototype device at EMEC (European Marine Energy Center) in both calm and rough winter conditions. Bottom wave velocity measurements were taken concurrently using a Doppler device.

280

Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)  

Science Conference Proceedings (OSTI)

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Detailed Monthly and Annual LNG Import Statistics (2004-2012...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Detailed Monthly and Annual LNG Import Statistics (2004-2012) Detailed Monthly and Annual LNG Import Statistics (2004-2012) Detailed Monthly and Annual LNG Import Statistics...

282

2008_Transition_Program_Details_Book_Three.pdf | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home 2008TransitionProgramDetailsBookThree.pdf 2008TransitionProgramDetailsBookThree.pdf 2008TransitionProgramDetail...

283

Building Technologies Office: Past Events NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

NewsDetail on Twitter Bookmark Building Technologies Office: Past Events NewsDetail on Google Bookmark Building Technologies Office: Past Events NewsDetail on Delicious Rank...

284

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

285

Equipment qualification research program: program plan  

Science Conference Proceedings (OSTI)

The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump.

Dong, R.G.; Smith, P.D.

1982-06-08T23:59:59.000Z

286

Master Plan For Improving Energy Efficiency  

E-Print Network (OSTI)

Presidential Executive Order 12003, dated July 1977, directed all government owned or leased facilities to develop and execute a 10-year Energy Conservation Plan. With facilities in seven states totaling 15 million square feet, the Albuquerque Operations Office of the Department of Energy (DOE) suddenly was facing a challenge. A Master Energy Management Plan was developed. With the 10-year period now nearly over, the effectiveness of the Master Plan can be examined. One DOE facility, the Kansas City plant which is operated by the Bendix Corporation for the DOE, has accomplished a 52 percent reduction so far, exceeding the goals by more than double the projected reduction. This paper will provide a detailed description of the integrated approach taken in making this plant the DOE's "Best Energy Managed Production Plant in 1982" and recipient of "Power Magazine's 1983 Industrial Energy Award."

Johnson, W. H.

1985-05-01T23:59:59.000Z

287

CANMET Gasifier Liner Coupon Material Test Plan  

SciTech Connect

The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

Mark Fitzsimmons; Alan Darby; Fred Widman

2005-10-30T23:59:59.000Z

288

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

289

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

290

Review of activities and plans for solar energy in Federal buildings  

DOE Green Energy (OSTI)

The purpose of this report is to provide the Department of Energy's Solar Federal Buildings Program with data on the Federal agencies' activities and plans regarding the use of solar energy in their buildings, and consequently, to make recommendations concerning the Solar Federal Buildings Program's plans. Specifically this report encompasses an analysis of agencies Ten Year Buildings construction, leasing and retrofit plans to provide visibility for and detailed knowledge of Federal agencies planning regarding solar and other renewable energy resources. The results of the analysis conducted, pertinent statistical information regarding planned solar projects, and recommendations concerning the SFBP plans are presented.

Not Available

1980-10-01T23:59:59.000Z

291

New Planning Framework  

Science Conference Proceedings (OSTI)

This report describes an investigation into how various regulatory, economic, and technical changes are likely to affect the framework for transmission planning. It begins with an overview of the Existing Planning Framework, structured along the lines of five key aspects that encompass the purview, role, and responsibilities of transmission planning. The report then explores seven scenarios (future states) of transformative change in the electricity industryranging from the greater penetration of wind ge...

2010-12-22T23:59:59.000Z

292

JGI - Sequencing Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

293

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

294

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

295

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

296

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

297

Business Plan Competition Opportunities  

The Draper Fisher Jurvetson Venture Challenge is a West Coast business plan competition available to the colleges and universities across the West Coast that

298

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

299

Planning, Budget, and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

EERE Planning, Budget, and Analysis (Revised) Philip Patterson (Economist) and Jeff Dowd (Economist) DOE Hydrogen, Fuel Cells, and Infrastructure Technologies Program Systems...

300

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Operations Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Strategic Plan Updated July 2009 Operations Organization Chief Operating Officer (COO) Deputy COO Environment, Health & Safety EH&S Facilities FAC Project Management...

302

Hoisting & Rigging Lift Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Authorized Personnel (attach more sheets if necessary) Printed name Signature Date SSRL Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005...

303

ORISE: Exercise Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the threat of a national security or...

304

Hanford Site Strategic Facilities Plan: Site planning  

SciTech Connect

This plan revises the Hanford Site Strategic Facilities Plan submitted by Westinghouse Hanford Company in 1988. It separates the Hanford Site facilities into two categories: ''strategically required'' facilities and ''marginal'' facilities. It provides a comparison of future facility requirements against existing capacities and proposed projects to eliminate or consolidate marginal facilities (i.e., those facilities that are not fully utilized or are no longer required to accomplish programmatic missions). The objective is to enhance the operating efficiency of the Hanford Site by maximizing facility use and minimizing unnecessary facility operating and maintenance costs. 11 refs.

1989-03-01T23:59:59.000Z

305

Solvent Refined Coal-II (SRC-II) detailed environmental plan  

Science Conference Proceedings (OSTI)

This document describes environmental research which will: aid in the development of an environmentally acceptable SRC-II process; and provide data for environmental assessment of the process. The SRC-II process is described, criteria for selection of samples to undergo environmental analyses are given, and approximate timelines are presented for obtaining pertinent samples. At this time, the SRC-II process is at the pilot-plant stage of development and a demonstration facility is scheduled to begin operation in 1984. Since design criteria may change, the environmental research described in this document is organized in four phases which correlate with and will provide information early in process development. Phase I research (screening) evaluates samples from existing SRC-II facilities (pilot, process demonstration unit (PDU), bench) which may bracket potential demonstration/commercial practice in terms of physical and chemical criteria. The samples are being subjected to a battery of short-term biomedical and ecological assays. Chemical fractionation and analysis are being performed to determine compounds and compound classes of potential concern. Phase II (baseline) research will evaluate SRC-II materials which are considered most representative of potential demonstration/commercial practice. These materials will be subjected to longer-term, more-extensive biological and ecological analyses relative to effects and environmental fate. Phase III research will examine effects of process modification, control technologies and changing operational conditions on potential environmental properties of SRC-II materials. Phase IV research (onsite monitoring) will develop methods and initiate environmental monitoring for effects at the SRC-II demonstration facility and potential commercial sites. This document also describes industrial hygiene programs which must occur throughout SRC-II process development.

Not Available

1980-10-01T23:59:59.000Z

306

Guidelines for strategic planning  

SciTech Connect

Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

1991-07-01T23:59:59.000Z

307

Reducing Ultra-Clean Transportation Fuel Costs with HyMelt Hydrogen  

DOE Green Energy (OSTI)

This report describes activities for the second quarter of work performed under this agreement. Kick off meetings with MEFOS, Kvarner and Siemens Westinghouse were held during the reporting period. MEFOS and Kvaerner have completed initial computational simulations. MEFOS has drafted a detailed experimental test plan and is making preparations for atmospheric testing, scheduled to begin on June 5.

Donald P. Malone; William R. Renner

2003-04-30T23:59:59.000Z

308

Sandia wind program FY94 annual operating plan  

SciTech Connect

This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

Dodd, H.M.

1993-10-01T23:59:59.000Z

309

A probabilistic plan recognition algorithm based on plan tree grammars  

Science Conference Proceedings (OSTI)

We present the PHATT algorithm for plan recognition. Unlike previous approaches to plan recognition, PHATT is based on a model of plan execution. We show that this clarifies several difficult issues in plan recognition including the execution of multiple ... Keywords: Action grammars, Bayesian methods, Goal recognition, Intent inference, Plan recognition, Probabilistic grammars, Task tracking

Christopher W. Geib; Robert P. Goldman

2009-07-01T23:59:59.000Z

310

First Detailed Look at RNA Dicer  

NLE Websites -- All DOE Office Websites (Extended Search)

Detailed Look at RNA Dicer Print Detailed Look at RNA Dicer Print Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to snip a double-stranded form of RNA into segments that can attach themselves to genes and block their activity. With this crystal structure, the researchers learned that Dicer serves as a molecular ruler, with a clamp at one end and a cleaver at the other end a set distance away, that produces RNA fragments of an ideal size for gene-silencing.

311

First Detailed Look at RNA Dicer  

NLE Websites -- All DOE Office Websites (Extended Search)

First Detailed Look at RNA Dicer Print First Detailed Look at RNA Dicer Print Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to snip a double-stranded form of RNA into segments that can attach themselves to genes and block their activity. With this crystal structure, the researchers learned that Dicer serves as a molecular ruler, with a clamp at one end and a cleaver at the other end a set distance away, that produces RNA fragments of an ideal size for gene-silencing.

312

Graphite technology development plan  

Science Conference Proceedings (OSTI)

This document presents the plan for the graphite technology development required to support the design of the 350 MW(t) Modular HTGR within the US National Gas-Cooled Reactor Program. Besides descriptions of the required technology development, cost estimates, and schedules, the plan also includes the associated design functions and design requirements.

NONE

1986-07-01T23:59:59.000Z

313

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

314

DISASTER PLAN Library Materials  

E-Print Network (OSTI)

New York: Neal-Schuman; 1992. Kahn, Miriam. Disaster Response and Prevention for Computer And DataDISASTER PLAN Library Materials For the University of Toronto Library System September 2013 disaster planning for archives, libraries and record centres. Second edition. Boston: Scarecrow Press, 2002

Sokolowski, Marla

315

Transportation Demand Management Plan  

E-Print Network (OSTI)

Transportation Demand Management Plan FALL 2009 #12;T r a n s p o r t a t i o n D e m a n d M a n the transportation impacts the expanded enrollment will have. Purpose and Goal The primary goal of the TDM plan is to ensure that adequate measures are undertaken and maintained to minimize the transportation impacts

316

Manufacturing research strategic plan  

SciTech Connect

This plan provides an overall strategic roadmap for the DOE-defense programs advanced manufacturing research program which supports the national science based stockpile stewardship program. This plan represents a vision required to develop the knowledge base needed to ensure an enduring national capability to rapidly and effectively manufacture nuclear weapons.

1995-11-01T23:59:59.000Z

317

Program Operations Plan  

SciTech Connect

The Department of Energy's Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE's university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP's rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

318

Gen IV Materials Handbook Implementation Plan  

SciTech Connect

A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product maintenance and enhancement. Contracting of development of the Handbook website is discussed in terms of host server options, cost, technology, developer background and cooperative nature, and company stability. One of the first and most important activities in website development will be the generation of a detailed Handbook product requirements document including case diagrams and functional requirements tables. The Implementation Plan provides a detailed overview of the organizational structure of the Handbook and details of Handbook preparation, publication, and distribution. Finally, the Implementation Plan defines Quality Assurance requirements for the Handbook.

Rittenhouse, P.; Ren, W.

2005-03-29T23:59:59.000Z

319

Geothermal development plan: Maricopa County  

DOE Green Energy (OSTI)

The Maricopa County Geothermal Development Plan evaluated the market potential for utilizing geothermal energy. The study identified six potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F) and in addition, four suspected intermediate temperature areas (90{sup 0} to 150{sup 0}C, 194{sup 0} to 300{sup 0}F). Geothermal resources are found to occur in and near the Phoenix metropolitan area where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing, trade and service sectors of the regional economy provides opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate to support this growth, though agricultural water use is expected to diminish. The study also contains a detailed section matching geothermal resources to potential users. Two comparative analyses providing economic details for space heating projects are incorporated.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

320

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

322

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

323

FY 1987 current fiscal year work plan  

SciTech Connect

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

1986-12-01T23:59:59.000Z

324

Strong planning under partial observability  

Science Conference Proceedings (OSTI)

Rarely planning domains are fully observable. For this reason, the ability to deal with partial observability is one of the most important challenges in planning. In this paper, we tackle the problem of strong planning under partial observability in ... Keywords: Binary decision diagrams, Heuristic search in belief space, Planning in nondeterministic domains, Planning under partial observability, Symbolic model checking

Piergiorgio Bertoli; Alessandro Cimatti; Marco Roveri; Paolo Traverso

2006-04-01T23:59:59.000Z

325

Reading Through a Plan: A Visual Theory of Plan Interpretation  

E-Print Network (OSTI)

Problem: Planners may read plans often, but the profession continues to view the interpretation of plan content as something that is either too obvious or too unimportant to require explicit discussion. Plans are seldom ...

Ryan, Brent D.

326

First Detailed Look at RNA Dicer  

NLE Websites -- All DOE Office Websites (Extended Search)

Detailed Look at RNA Dicer Detailed Look at RNA Dicer First Detailed Look at RNA Dicer Print Wednesday, 25 January 2006 00:00 Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to snip a double-stranded form of RNA into segments that can attach themselves to genes and block their activity. With this crystal structure, the researchers learned that Dicer serves as a molecular ruler, with a clamp at one end and a cleaver at the other end a set distance away, that produces RNA fragments of an ideal size for gene-silencing.

327

CBECS 1992 - Consumption & Expenditures, Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

Detailed Tables Detailed Tables Detailed Tables Figure on Energy Consumption in Commercial Buildings by Energy Source, 1992 Divider Line The 49 tables present detailed energy consumption and expenditure data for buildings in the commercial sector. This section provides assistance in reading the tables by explaining some of the headings for the data categories. It will also explain the use of row and column factors to compute both the confidence levels of the estimates given in the tables and the statistical significance of differences between the data in two or more categories. The section concludes with a "Quick-Reference Guide" to the statistics in the different tables. Categories of Data in the Tables After Table 3.1, which is a summary table, the tables are grouped into the major fuel tables (Tables 3.2 through 3.13) and the specific fuel tables (Tables 3.14 through 3.29 for electricity, Tables 3.30 through 3.40 for natural gas, Tables 3.41 through 3.45 for fuel oil, and Tables 3.46 through 3.47 for district heat). Table 3.48 presents energy management and DSM data as reported by the building respondent. Table 3.49 presents data on participation in electric utility-sponsored DSM programs as reported by both the building respondent and the electricity supplier.

328

EMSL Strategic Plan 2008  

SciTech Connect

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

329

Public affairs plan  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

Not Available

1994-09-01T23:59:59.000Z

330

Planning guidance for the Chemical Stockpile Emergency Preparedness Program  

Science Conference Proceedings (OSTI)

This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

1995-02-01T23:59:59.000Z

331

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

332

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Climate Change Technology Program Strategic Plan Releases Climate Change Technology Program Strategic Plan DOE Releases Climate Change Technology Program Strategic Plan September 20, 2006 - 9:01am Addthis Plan Outlines Strategies for Reducing Greenhouse Gas Emissions through Development and Deployment of Advanced Technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today released the Climate Change Technology Program (CCTP) Strategic Plan, which details measures to accelerate the development and reduce the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions. CCTP is the technology component of a comprehensive U.S. strategy introduced by President Bush in 2002 to combat climate change that include measures to slow the growth of greenhouse gas emissions through

333

Update of the Used Fuel Disposition Campaign Implementation Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update of the Used Fuel Disposition Campaign Implementation Plan Update of the Used Fuel Disposition Campaign Implementation Plan Update of the Used Fuel Disposition Campaign Implementation Plan The Used Fuel Disposition Campaign will identify alternatives and conduct scientific research and technology development to enable storage, transportation, and disposal of used nuclear fuel and wastes generated by existing and future nuclear fuel cycles. This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign supports achievement of the overarching Fuel Cycle Research and Development Program mission and objectives. Activities will be sufficiently flexible to accommodate any of the potential fuel cycle options for used fuel management. Update of the Used Fuel Disposition Campaign Implementation Plan

334

Plan recognition in exploratory domains  

Science Conference Proceedings (OSTI)

This paper describes a challenging plan recognition problem that arises in environments in which agents engage widely in exploratory behavior, and presents new algorithms for effective plan recognition in such settings. In exploratory domains, agents@? ... Keywords: Plan recognition, User modeling

Yaakov Gal; Swapna Reddy; Stuart M. Shieber; Andee Rubin; Barbara J. Grosz

2012-01-01T23:59:59.000Z

335

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

336

DOE Retro Analysis Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro Analysis Plan Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for Retrospective Analysis of Existing Rules. We are encouraged by DOE's efforts to implement Executive Order 13563. We appreciate the actions already taken by DOE to address our concerns regarding the Final Rule on Certification, Compliance, and Enforcement Regulations for Consumer Products and Commercial and

337

Plan Your School Visit  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Your School Visit Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit Chaperones To ensure that your students have the best possible experience at the Museum, we ask that you provide one chaperone for every 6 children. The chaperones should stay with their assigned group of students throughout the entire visit and model positive behavior. General Before arriving at the Museum, please remind your students about the following guidelines: If possible, leave food and drinks on the bus. Respect other visitors in the Museum by using inside voices, walking, etc. Please be gentle with the exhibits. Cameras are welcome at the Bradbury Science Museum. Have fun! Upon your arrival

338

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues...

339

Policy & Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

340

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

LFRG Program Management Plan  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

342

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States...

343

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the...

344

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

345

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

346

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

347

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

348

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agencys State and Local Climate Change Program...

349

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin OMalley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

350

EMSL 2006 Strategic Plan  

SciTech Connect

The 2006 EMSL Strategic Plan describes the elements of EMSLs 5-year strategy to provide outstanding value to its user community and to meet evolving goals of the DOE Office of Biological Research.

Campbell, Allison A.

2005-12-21T23:59:59.000Z

351

Environmental Management System Plan  

E-Print Network (OSTI)

3) environmental management programs, (4) training, (5)Management Programs3-5 Structure and Responsibility.3-6 Training,Management System Plan Program Elements Additional information regarding EMS training

Fox, Robert

2009-01-01T23:59:59.000Z

352

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

353

Regional hydrothermal commercialization plan  

SciTech Connect

This plan for the Rocky Mountain Basin and Range Region articulates the complete range of initiatives (federal, state, local, and industrial) required for the early commercialization of the regions geothermal resources. (MHR)

1978-07-14T23:59:59.000Z

354

Colorado geothermal commercialization planning. Semi-annual progress report, January 1, 1979-June 30, 1979  

DOE Green Energy (OSTI)

The potential for developing the geothermal resources of Colorado is detailed. Constraints that are limiting geothermal energy development are described. Area development plans, an institutional analysis, and the outreach program are presented. (MHR)

Coe, B.A.

1979-01-01T23:59:59.000Z

355

WIPP - Passive Institutional Controls (PICs) Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing Plan...

356

Annual Training Plan Template | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Template Annual Training Plan Template The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan. The...

357

Building Technologies Office: Strategic Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

358

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Management (IPPM) Head Program Administrator Planning Coordination Performance Analysis Chief Operating Officer Risk Analysis Lab PlanningGoal Setting Process ...

359

Geothermal Technologies Program Strategic Plan  

SciTech Connect

This DOE/EERE program strategic plan builds upon previous program plans and R&D direction reviews with industry representatives and other stakeholders.

2004-08-01T23:59:59.000Z

360

2011-2020 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

LM has completed its 2011-2020 Strategic Plan. The new plan provides our organization with clear directions for the future.

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Waste Minimization Plan Prepared by  

E-Print Network (OSTI)

Waste Minimization Plan Prepared by: Environmental Health and Safety Department Revised February 2012 #12;Waste Minimization Plan Table of Contents Policy Statement........................................................... 3 Centralized Waste Management Program

362

Emergency Action Plan (EAP) Template  

NLE Websites -- All DOE Office Websites (Extended Search)

00q09e011.doc i (042013) Local Emergency Plan BUILDING: COMPLEX: ZONE: PLAN APPROVAL DATE: Approved by Name Signature Date Local Emergency Coordinator John Cintorino Facility...

363

Site Sustainability Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

364

WESTERN UNIVERSITY Disaster Plan  

E-Print Network (OSTI)

.7 Assumptions 1.7.1 Emergency 1.7.2 Disaster 1.8 Concept of Operations 1.8.1 Background 1.8.2 Emergency Response/Administrative Unit Responsibilities 1.8.8 Situation Reports 2. UTILIZING THE DISASTER PLAN 2.1 Emergency Process Members ­ Individual Responsibilities #12;WESTERN UNIVERSITY Disaster Plan January, 2013 2.7.1 VP

Sinnamon, Gordon J.

365

Environmental protection Implementation Plan  

SciTech Connect

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

366

Energy Efficiency Planning Guidebook  

Science Conference Proceedings (OSTI)

Demand planning is an essential undertaking for utilities looking to understand and quantify the dispatchable resources associated with energy efficiency and demand response programs. Further, demand planning enables a utility to select the most appropriate, cost-effective suite of energy efficiency technologies, demand response technologies, and program delivery mechanisms for its unique market and operating conditions as well as the optimal level of investment. This guidebook reviews and explains a com...

2008-07-07T23:59:59.000Z

367

Economic Impacts of Carbon Taxes: Detailed Results  

Science Conference Proceedings (OSTI)

Due to the possibility that rising concentrations of atmospheric greenhouse gases might cause undesirable climate change, policies to restrict emissions of carbon dioxide, a greenhouse gas, have been proposed. Such proposals frequently take the form of carbon taxes. This report presents the detailed results of an examination of the economic costs of carbon taxes, including where and how the U.S. economy would be impacted.

1995-01-04T23:59:59.000Z

368

International Photovoltaic Program Plan  

SciTech Connect

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

369

International Photovoltaic Program Plan  

DOE Green Energy (OSTI)

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

370

Details of U.S. Climate Zones:  

U.S. Energy Information Administration (EIA) Indexed Site

Details of U.S. Climate Zones Details of U.S. Climate Zones Details of U.S. Climate Zones: The CBECS climate zones are groups of climate divisions, as defined by the National Oceanic and Atmospheric Administration (NOAA), which are regions within a state that are as climatically homogeneous as possible. Each NOAA climate division is placed into one of five CBECS climate zones based on its 30-year average heating degree-days (HDD) and cooling degree-days (CDD) for the period 1971 through 2000. (These climate zones have been updated for the 2003 CBECS. All previous CBECS used averages for the 45-year period from 1931 through 1975.) A HDD is a measure of how cold a location was over a period of time, relative to a base temperature (in CBECS, 65 degrees Fahrenheit). The heating degree-day is the difference between that day's average temperature and 65 degrees if the daily average is less than 65; it is zero if the daily average temperature is greater than or equal to 65. For example, if the average temperature for a given day is 40 degrees, then the heating degree-days for that single day equal 25. Heating degree-days for a year are the sum of the daily heating degree-days that year.

371

First Nations Community Planning Model [EDRA / Places Awards, 2003 -- Planning  

E-Print Network (OSTI)

EDRA/Places planning awards should principally recognizeoutcomes. But others felt the awards should also recognize

Moffat, David

2004-01-01T23:59:59.000Z

372

Ventilation planning at Energy West's Deer Creek mine  

SciTech Connect

In 2004 ventilation planning was initiated to exploit a remote area of Deer Creek mine's reserve (near Huntington, Utah), the Mill Fork Area, located under a mountain. A push-pull ventilation system was selected. This article details the design process of the ventilation system upgrade, the procurement process for the new fans, and the new fan startup testing. 5 figs., 1 photo.

Tonc, L.; Prosser, B.; Gamble, G. [Pacific Corp., Huntington, UT (United States)

2009-08-15T23:59:59.000Z

373

Your New Furman University Retirement Plan Investment Menu  

E-Print Network (OSTI)

Your New Furman University Retirement Plan Investment Menu from TIAA-CREF (effective February 7, 2011) For detailed descriptions of each of these accounts and funds, go to www.tiaa TIAA-CREF International Equity Fund TRERX Equities TIAA-CREF International Equity Index Fund TRIEX

374

RENSSELAER POLYTECHNIC INSTITUTE DC EMPLOYER Plan Services and Costs  

E-Print Network (OSTI)

providers: - TIAA-CREF - Fidelity Investments TIAA-CREF Right to Direct Investments You may specify how your as described in the Summary Plan Document. These changes can be made: 1. Online by visiting tiaa-cref.org 2. A current list of investment options and detailed descriptions of each one is available online at www.tiaa

Bystroff, Chris

375

Quality Assurance Program Plan for radionuclide airborne emissions monitoring  

SciTech Connect

This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

Vance, L.M.

1993-07-01T23:59:59.000Z

376

Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000  

Science Conference Proceedings (OSTI)

This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.

NONE

1994-12-01T23:59:59.000Z

377

Generalizing GraphPlan by Formulating Planning as a CSP  

E-Print Network (OSTI)

We examine the approach of encoding planning problems as CSPs more closely. First we present a simple CSP encoding for planning problems and then a set of transformations that can be used to eliminate variables and add new constraints to the encoding. We show that our transformations uncover additional structure in the planning problem, structure that subsumes the structure uncovered by GRAPHPLAN planning graphs. We solve the CSP encoded planning problem by using standard CSP algorithms. Empirical evidence is presented to validate the effectiveness of this approach to solving planning problems, and to show that even a prototype implementation is more effective than standard GRAPHPLAN. Our prototype is even competitive with far more optimized planning graph based implementations. We also demonstrate that this approach can be more easily lifted to more complex types of planning than can planning graphs. In particular, we show that the approach can be easily extended to planning with resources.

Adriana Lopez; Fahiem Bacchus

2003-01-01T23:59:59.000Z

378

2008_Transition_Budget_Details_Book_Four.pdf | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration Other Agencies You are here Home 2008TransitionBudgetDetailsBookFour.pdf 2008TransitionBudgetDetailsBookFour.pdf 2008TransitionBudgetDetailsBo...

379

High Performance Windows Volume Purchase: NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

NewsDetail to someone by E-mail Share High Performance Windows Volume Purchase: NewsDetail on Facebook Tweet about High Performance Windows Volume Purchase: NewsDetail on Twitter...

380

Testing operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) |  

Open Energy Info (EERE)

operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Testing operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) Details Activities (1) Areas (1) Regions (0) Abstract: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) was drilled to investigate the potential of the Coso Hot Springs Known Geothermal Resource Area (KGRA) in southeastern California. Detailed background information is contained in the drilling plan, Coso Geothermal Exploratory Hole No. 1 (CGEH-1), NVO-184, dated June 1977. The purpose of this supplement to NVO-184 is to establish a plan of operations for testing the resource after completion of well drilling activities. Major elements of this plan include

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Institutional plan FY 1998--FY 2003  

SciTech Connect

The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

NONE

1997-10-01T23:59:59.000Z

382

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

383

Corporate strategic plan for safeguards and security  

SciTech Connect

Department of Energy (DOE) safeguards and security (S and S) is a team effort, consisting of Field, National Laboratories, Program Office, and Headquarters units cooperating to support the Department`s diverse security needs. As an integral part of the nation`s security structure, the DOE S and S Program regularly supports and works in cooperation with other US Government agencies and private industry to improve the national security posture. Thus, inter- and intra-agency partnerships play an invaluable role in the continuing efforts to integrate and implement improved ways of doing business. Their Corporate Strategic Plan provides a road map to guide, track, and provide feedback for the incorporation and implementation of S and S activities within DOE. Part 1 Planning Framework, describes those overarching factors which influence the planning endeavors. Part 2, Strategic Perspective, outlines where the S and S Program has been and how they will move to the future through core competencies, changing cultural thinking, and implementing their strategies. Part 3, Strategic and Operational Integration, details critical focus areas, strategies, and success indicators designed to enhance inter-agency S and S integration and promote cooperation with external agencies. This Plan will be reviewed annually to ensure it remains supportive and fully-engaged with the nation`s and international security environments.

1997-06-01T23:59:59.000Z

384

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

385

Site Support Program Plan Infrastructure Program  

SciTech Connect

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

386

EQUALITY PLAN Please contact equalopportunities@swansea.ac.uk for alternative formats of this  

E-Print Network (OSTI)

://www.swan.ac.uk/media/EOC%20Annual%20Report%202009- 2010.pdf The University Fee Plan Details of the University Fee Plan 2012-2013 http://www.swan.ac.uk/media/EOC%20Annual%20Report%202010-2011.pdf Other university data University Fee partnership (where appropriate). These groups all report to the University Equal Opportunities Committee (EOC

Martin, Ralph R.

387

INEL/Snake River plain geothermal drilling and testing plan - INEL - 1 well  

DOE Green Energy (OSTI)

A plan for drilling a 7500 ft exploratory hole is described. This hole would be drilled at the Idaho National Engineering Laboratory, so that it could be immediately used by one of the government facilties. The plan details the hole design, describes the drilling program, proposes a testing program, and estimates costs. (MHR)

Miller, L.G.; Prestwich, S.M.; Griffith, J.L.

1978-12-01T23:59:59.000Z

388

CMS System Security Plan Template  

Science Conference Proceedings (OSTI)

System Security Plan (SSP) Template Instructions. This template contains boiler plate language. Each template must be ...

2009-06-30T23:59:59.000Z

389

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

1994-02-01T23:59:59.000Z

390

Draft Transportation Institutional Plan  

SciTech Connect

The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

1985-09-01T23:59:59.000Z

391

Heat pipe testing program test plan  

SciTech Connect

A test plan is given which describes the tests to be conducted on several typical solar receiver heat pipes. The hardware to be used, test fixtures and rationale of the test program are discussed. The program objective is to perform life testing under simulated receiver conditions, and to conduct performance tests with selected heat pipes to further map their performance, particularly with regard to their transient behavior. Performance requirements are defined. Test fixtures designed for the program are described in detail, and their capabilities for simulating the receiver conditions and their limitations are discussed. The heat pipe design is given. (LEW)

Bienert, W.B.

1980-03-14T23:59:59.000Z

392

Prepared for: REGION C WATER PLANNING GROUP Prepared by:  

E-Print Network (OSTI)

This model water conservation plan was prepared by Freese and Nichols, Alan Plummer Associates, and Chiang, Patel, and Yerby for the Region C Water Planning Group. It is intended as a template for manufacturers within Region C as they develop their own water conservation plans. Manufacturers should customize the details to match their unique situation. The model plan was prepared pursuant to Texas Commission on Environmental Quality rules. The rules do not require a drought contingency plan for manufacturers. The other Region C model water conservation plans (for municipal, steam electric power, and irrigation users) include example text for a fictional water user that can be edited to match a real-life situation. However, there are a large number of manufacturers in Region C with widely varying processes and water uses, and it is difficult to generate example text that is applicable to most manufacturers. This template provides a plan structure and instructions for the type of content that belongs in each section. The water conservation plans for the City of Fort Worth 1, the City of Dallas 2, New Mexico Office of the State Engineer (Guide for Commercial, Institutional, and Industrial Users) 3 were used

Brian K. Mcdonald; Alan Plummer Associates; Thomas C. Gooch; Stephanie W. Griffin; Alan Plummer Associates

2005-01-01T23:59:59.000Z

393

Quality Guidelines for Energy System Studies: Detailed Coal Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

Q Q U U A A L L I I T T Y Y G G U U I I D D E E L L I I N N E E S S F F O O R R E E N N E E R R G G Y Y S S Y Y S S T T E E M M S S T T U U D D I I E E S S D D e e t t a a i i l l e e d d C C o o a a l l S S p p e e c c i i f f i i c c a a t t i i o o n n s s DOE/NETL-2010/???? DOE/NETL-401/012111 National Energy Technology Laboratory Office of Program Planning and Analysis 2 January 2012 Detailed Coal Specifications Quality Guidelines for Energy System Studies Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

394

High Risk Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Risk Plan Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are an Issue * With respect to reductions in high risk contracting strategies, the M&O contracts was also a challenge since the opportunity to further influence competition and contract type was highly constrained. The Department had already competed approximately 85 percent of its M&O

395

Standard Review Plan Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

396

IT Capital Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

397

Human Capital Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Plan Bea Dukes Melissa Rider AHCP Issues  Decentralization of Contracting Process within DOE  In spite of MA and CFO guidance, the actual (FTE) growth of Acquisition Workforce depends on Program Office and/or site level management Recap of this year's planning process  Thanks for your efforts on the development and consolidation of this year's AHCP  Collaborative effort with most HCA level activities  A few glitches ◦ OMB Template very confusing and required much clarification ◦ Many changes throughout the process  Thanks for your patience ◦ Lesson Learned: SPE, CFO, HC and Program Offices must be in synchronization Fallout  Additional funding called out in FY11 -

398

DRAFT Bear Safety Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Bear Safety Plan June 2010 Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at Atqasuk, a town 100km inland from Barrow. Other instrumentation locations in more remote areas on the North Slope may be established in later stages of the project. Polar bears, and to a lesser extent, brown bears (barren ground grizzly) are significant hazards within the ACRF/NSA/AAO

399

Report: Strategic Planning Impacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

400

IT Capital Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Customer Service Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

402

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

403

INL Executable Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-11383 ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report DOE/ID-11383 Revision 2 December 2010 Approved By: ~~~/ Jeffrey~USseau Fa~ 7 Dlte President and General Manager , - Bechtel BWXT Idaho, LLC Advanced Mixed Waste Treatment Project (This Page Intentionally Left Blank)

404

DOE CONTRACTOR PENSION PLANS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

405

Energy Organizational Planning  

SciTech Connect

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

406

EMSL Strategic Plan 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

407

PICs Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

408

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

409

Permanent Markers Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

410

Environmental protection implementation plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

411

Guam Strategic Energy Plan  

SciTech Connect

Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

Conrad, M. D.

2013-07-01T23:59:59.000Z

412

Performance Management Plan  

SciTech Connect

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

413

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

414

Geothermal development plan: Pinal County  

SciTech Connect

The Pinal County Area Development Plan evaluated the county-wide market potential for utilizing geothermal energy. The study identified three suspected geothermal resource areas with potential 70/sup 0/C (158/sup 0/F) temperatures. In addition, one geothermal test well near Coolidge encountered bottom hole temperatures of 120/sup 0/C (248/sup 0/F) at a depth of 2440 m (8005 ft) and produced 18.3 l/sec (290 gpm). Geothermal resources are found to occur near population centers where average growth rates of 1.5% to 2% per year are expected over the next 40 years. Mining, agriculture and manufacturing are all important sectors of the regional economy and provide opportunities for direct utilization of geothermal energy. A regional energy use analysis includes energy use projections and regional energy price information. Agriculture accounts for 95% of the annual water consumption and predicted decreases in water availability will result in less future agricultural activity. The analysis contains a detailed section matching geothermal resources to potential industrial users. Fourteen firms in 10 industrial classes were identified as having some potential for geothermal energy use. In addition, 25 agricultural firms were identified as having some potential for geothermal use, including the prepared feeds industry.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

415

LCIS: a boundary hierarchy for detail-preserving contrast reduction  

Science Conference Proceedings (OSTI)

Keywords: displays, level of detail algorithms, non-realistic rendering, radiosity, signal processing, weird math

Jack Tumblin; Greg Turk

1999-07-01T23:59:59.000Z

416

Intermountain Province Subbasin Plan  

E-Print Network (OSTI)

Intermountain Province Subbasin Plan EXECUTIVE SUMMARY Spokane, Washington GEI Consultants, Inc. The Intermountain Province (IMP) is located in the northeast corner of Washington State and the northern Idaho Oreille and Spokane subbasins are in Washington and Idaho. The remaining subbasins are within Washington

417

Multispecies Conservation Planning  

E-Print Network (OSTI)

CHAPTER 3 Multispecies Conservation Planning on U.S. Federal Lands Barry R. Noon, Kevin S. McKelvey, and Brett G. Dickson Numerous laws directly, or indirectly, mandate the conservation of all species that govern the use of these same lands that are in conflict with a goal of maximizing the conservation

418

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

419

Comprehensive facilities plan  

Science Conference Proceedings (OSTI)

The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

NONE

1997-09-01T23:59:59.000Z

420

Introduction to Transportation Planning  

E-Print Network (OSTI)

Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

Tipple, Brett

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ACNW - 1998 strategic plan  

SciTech Connect

This plan provides strategic direction to The Advisory Committee on Nuclear Waste (ACNW) in 1998 and beyond for focusing on issues most important to the NRC in carrying out its mission of protecting public health and safety, promoting the common defense and security, and protecting the environment.

1998-04-01T23:59:59.000Z

422

PNNL Campus Master Plan  

SciTech Connect

The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

Mosey, Whitney LC

2012-09-07T23:59:59.000Z

423

Hoechst plans Mexican unit  

SciTech Connect

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

424

Strategic Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

425

Performance Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Plans Performance Plans Performance Plans December 13, 2013 Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FY 2014-15 Annual Performance Plan December 18, 2012 Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013 and 2014 planned activities. November 28, 2011 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities.

426

Workforce Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy and Guidance » Human Capital Management » Workforce Plans Policy and Guidance » Human Capital Management » Workforce Plans Workforce Plans Workforce Planning is an integral part of the human capital planning process. The intent of every workforce planning effort is to ensure that organizations have the resources necessary to meet mission requirements and program priorities. To achieve this intent, organizations must first identify and understand those mission requirements and program priorities; typically through Strategic Planning. These goals and objectives not only provide the basis for determining necessary financial resources, but they also provide the basis for determining workforce needs. For assistance with creating or modifying your workforce plans please see our Guide to Workforce Planning Documents Available for Download

427

Deterministic planning in the fifth international planning competition: PDDL3 and experimental evaluation of the planners  

Science Conference Proceedings (OSTI)

The international planning competition (IPC) is an important driver for planning research. The general goals of the IPC include pushing the state of the art in planning technology by posing new scientific challenges, encouraging direct comparison of ... Keywords: Automated planning, Benchmarks for planning, Experimental evaluation of planning systems, International planning competition, Knowledge representation in planning, PDDL, Plan constraints, Planning languages, Planning systems, Preferences in planning

Alfonso E. Gerevini; Patrik Haslum; Derek Long; Alessandro Saetti; Yannis Dimopoulos

2009-04-01T23:59:59.000Z

428

Strategic Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plans Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more by reading strategic planning reports for specific research areas. Standing Technical Committees The Building America program actively engages all relevant industry stakeholders in the research planning process, primarily through Standing Technical Committees (STCs). STCs focus on identifying and resolving key

429

Fermilab Master Plan Fermilab Master Plan Overview Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Master Plan Master Plan Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013 Thursday, February 21, 13 Fermilab Master Plan Integrating the new vision for the Intensity Frontier facilities and other Science with a sound strategy for infrastructure and support facility development Thursday, February 21, 13 Fermilab Master Plan In order to help define and best use all laboratory resources to most effec5vely and efficiently meet Fermilab's Plan for Discovery, the laboratory is developing a Fermilab Campus Master Plan (FCMP) for the next 20 years. The document will guide the development of modern, produc5ve, and efficient laboratory facili5es that will enable the laboratory to fulfill its mission of advancing

430

Planning support systems for spatial planning through social learning  

E-Print Network (OSTI)

This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

Goodspeed, Robert (Robert Charles)

2013-01-01T23:59:59.000Z

431

2007 Solar Decathlon Detailed Event Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

DETAILED EVENT SCHEDULE DETAILED EVENT SCHEDULE Last updated on September 14, 2007 Note: This schedule is subject to change at any time. 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00

432

NIF special equipment construction health and safety plan  

SciTech Connect

The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

Sawicki, R.H.

1997-07-28T23:59:59.000Z

433

Implementing the Delivery Plan  

E-Print Network (OSTI)

debate in manufacturing. In addition to training highly-skilled people to be the research and industry materials, fibres and components · Cutting-edge composite manufacturing processes; including additive further details on some of the major themes we are funding, including Manufacturing the future, Healthcare

Zharkova, Valentina V.

434

2011-2020 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a quick idea of how this plan has evolved, we'll start by observing that the job of a strategic plan is not to suggest that we keep on doing the same thing as before; it is,...

435

LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK April 2004 PUBLICATION.....................................................................................................................2 SECTION II: HOW TO PREPARE THE PLAN Step 1: Designate an Energy Emergency Coordinator.......................................................................................................12 SECTION III: EXAMPLES OF OPERATING GUIDELINES Energy Emergency Coordinator

436

Sensitivity of PDR Calculations to Microphysical Details  

E-Print Network (OSTI)

Our understanding of physical processes in Photodissociation regions or Photon Dominated Regions (PDRs) largely depends on the ability of spectral synthesis codes to reproduce the observed infrared emission-line spectrum. In this paper, we explore the sensitivity of a single PDR model to microphysical details. Our calculations use the Cloudy spectral synthesis code, recently modified to include a wealth of PDR physical processes. We show how the chemical/thermal structure of a PDR, along with the calculated spectrum, changes when the treatment of physical processes such as grain physics and atomic/molecular rates are varied. We find a significant variation in the intensities of PDR emission lines, depending on different treatments of the grain physics. We also show how different combinations of the cosmic-ray ionization rate, inclusion of grain-atom/ion charge transfer, and the grain size distribution can lead to very similar results for the chemical structure. Additionally, our results show the utility of Cloudy for the spectral modeling of molecular environments.

N. P. Abel; P. A. M. van Hoof; G. Shaw; G. J. Ferland; T. Elwert

2008-08-19T23:59:59.000Z

437

Rail Planning Timeline  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Timeline: By Responsible Party Planning Timeline: By Responsible Party Rev. 4.0, November 2006 Timeframe Offeror/Agent FRA Railroad(s) Other Post Shipment * DOE conducts Lessons Learned Review. During Shipment(s) * The offeror (shipper) will ensure that the appropriate FRA point of contact is notified of any changes 1 in the transportation schedule upon confirmation of the change (modification of SCOP OI-4). * DOE will notify the state Governors or designees and designated tribal points of contact by telephone in the event of schedule changes greater than six hours (DOE Manual 8.2.1). * In the event of a substantial unanticipated delay en route (e.g., greater than 2 hours), the affected states and tribes will be notified of the event by TRANSCOM. 2 TRANSCOM will notify the affected states and tribes

438

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

439

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

440

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Individual Development Plan (IDP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Individual Development Plan (IDP) Individual Development Plan (IDP) SAMPLE 10/01/2012 to 09/30/2013 Training Reason Developmental Activity Description Training Cost Travel Cost Total Cost Hours Start Date/ Completion Date Short Range Goal 1: Enhance Leadership Skills Development Mentoring Receive mentoring from a higher grade employee (s) and provide mentoring to lower grade employee(s). 0 0 0 TBD 1/1/2013 Development Instructor led EM Leadership Excellence Program - Interpersonal Communication Skills 0 0 0 8 6/15/2013 Development Instructor led Federal Executive Institute (OPM): Leadership for a Democratic Society $18,300 0 0 30 day residential TBD Development Shadowing Shadow one or more SES employees for one or two day period to learn leadership techniques. 0 0 0 TBD TBD

442

Plan Your Arrival  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Your Arrival Plan Your Arrival Special arrangements and training are required for your first visit. When you complete your APS orientation, you will be issued an APS badge. With this badge you may enter the site at any time. Notify User Office When you know which beamline you'll be using and the date of your beam time, contact the User Office. We will check the status of your request for access and schedule any required orientation and training (630-252-9090, apsuser@aps.anl.gov). If you will arrive outside of normal business hours, you must notify the User Office in advance so we can arrange for gate access. Make Travel Arrangements When the User Office has notified you that you have been approved for access and your training has been scheduled, you may make your travel

443

Proj. Plan Example SEM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Plan Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart to include known resources. b. Section(s): 3.6 & 3.7 Page Number(s): 3-8 through 3-10 Summary of Change(s): Modified Resource Loading Chart to reflect current estimates. Modified Project/Deliverable Schedule to reflect current status of project. c. Section(s): Page Number(s): Summary of Change(s):

444

Community Relations Plan Update  

Office of Legacy Management (LM)

8-TAR 8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this document, please call (800) 269-7145 (Utah only) or Monticello Repository Office Complex (435) 587-4000 DOE Grand Junction Office Community Relations Plan Update FY 2001 Page v Table of Contents Terms and Abbreviations........................................................................................................... vii

445

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

446

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

447

RHIC STATUS AND PLANS.  

Science Conference Proceedings (OSTI)

RHIC ended successfully its second year of operation in January 2002 after a six month run with gold ions and two months of polarized proton collisions. I will review the machine performance and accomplishments, that include reaching design energy (100 GeV/u) and design luminosity during the gold run, and the first high energy (100 GeV) polarized proton collisions. I will also discuss the machine development strategy and the main performance milestones. The goals and plans for the shutdown and the nest run, scheduled to start in November 2002 have been the focus of a RHIC Retreat in March 2002. I will summarize findings and plans for the upcoming run and outline a vision for the nest few years of RHIC operation and upgrades.

PILAT,R.

2002-06-02T23:59:59.000Z

448

CIPS Validation Data Plan  

SciTech Connect

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

449

Computers aid drilling planning  

Science Conference Proceedings (OSTI)

This article reports that computers are rapidly becoming an indispensable tool for the drilling engineer both in town and at the wellsite. Two factors have contributed to the sudden increase in their use. The first is the need to cut drilling costs. Engineers have been forced to take a more critical look at plans and past experience. The second is the falling price (and increased portability) of hardware and software. Several major operators have demonstrated that careful planning of drilling operations based on local knowledge and data from offset wells can reduce the drilling learning curve substantially. Computers make it possible to retrieve and process offset well data rapidly and efficiently. They also offer powerful mathematical models which describe complicated aspects of drilling.

Burgess, T.

1986-11-01T23:59:59.000Z

450

Hanford Emergency Response Plan  

SciTech Connect

The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

Wagoner, J.D.

1994-04-01T23:59:59.000Z

451

CIPS Validation Data Plan  

SciTech Connect

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

452

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

453

Generating custom test plans for CASE{sup *}Dictionary 5.0  

Science Conference Proceedings (OSTI)

Most database development organizations use a formal software development methodology that requires a certain amount of formal testing. The amount of formal testing that will be performed will vary from methodology to methodology and from site to site. If a very detailed formal test plan is required for each module in a system, the work involved to produce the test plan can be tedious and costly. After a system has been designed and developed using Oracle*CASE, there is much useful information in the CASE*Dictionary repository. If this information could be tied to specific test requirements, a test plan could be generated automatically, saving much time and resources. This paper shows how CASE*Dictionary can be used to store test plan information that can then be used to generate a specific test plan for each module based on it`s detailed data usage.

Atkins, K.D. [Boeing Computer Services, Richland, WA (United States)

1994-04-01T23:59:59.000Z

454

Sodium-Bearing Waste Treatment, Applied Technology Plan  

SciTech Connect

Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology.

Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

2003-06-01T23:59:59.000Z

455

Review and summary of Solar Thermal Conversion Program planning assistance  

DOE Green Energy (OSTI)

The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

Not Available

1975-06-01T23:59:59.000Z

456

Test Plan for Composite Hydrogen Getter Materials  

SciTech Connect

The intent of this test plan is to provide details of the Savannah River Technology Center (SRTC) effort to evaluate composite getter materials for eventual use in expanding the wattage limits for transportation of contact-handled transuranic waste (CH-TRU). This effort is funded by the Mixed Waste Focus Area (MWFA) under Technical Task Plan (TTP) SR-1-9-MW-45 and is the result of a competitive process initiated by a MWFA request for proposals. In response to this request, SRTC presented data on several composite getter materials that demonstrated good potential for application in transportation of transuranic wastes. The tests outlined in the SRTC proposal for composite getter materials should demonstrate compliance with functional requirements provided by the MWFA in a Statement of Work (SOW) which accompanied the request for proposals. Completion of Phase 1 testing, as defined in the TTP, should provide sufficient data to determine if composite getters should progress to Phase s 2 and 3. These test results will provide support for future safety reviews as part of the Transuranic Package Transporter-II (TRUPACT-II) certification process to utilize getter technology. This test plan provides details of the test descriptions, test objectives, required measurements, data quality objectives, data analysis, and schedule information relevant to Phase 1 of the TTP. The results of these tests are expected to help identify any potential weaknesses in the use of composite getter for transportation of CH-TRU wastes. Where a potential weakness is identified, this will be addressed as part of Phase 2 of the proposed effort. It is also important to recognize that these tests are focused on the individual composite getter materials and not the engineered system that would eventually be used in a TRUPACT-II. However, these test results will be very helpful in establishing the requirements for the design of a TRUPACT-II getter system that is included as part of the propo sed Phase 3 effort.

Livingston, R.R.

2000-11-09T23:59:59.000Z

457

National Infrastructure Protection Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Infrastructure Protection Plan 2006 Preface Preface i The ability to protect the critical infrastructure and key resources (CI/KR) of the United States is vital to our national security, public health and safety, economic vitality, and way of life. U.S. policy focuses on the importance of enhancing CI/KR protection to ensure that essential governmental missions, public services, and economic functions are maintained in the event of a

458

Catalyst Management Planning  

Science Conference Proceedings (OSTI)

Catalyst used in selective catalytic reduction (SCR) systems for NOx control in coal-fired power plants is susceptible to deactivation over time due to exposure to trace elements contained in the coal. In order to sustain the levels of NOx reduction needed to comply with regulatory requirements, periodic replacement of the catalyst modules with new or regenerated catalyst is an essential element in operating an SCR system. Catalyst management planning is a process whereby decisions are made about when ca...

2010-12-21T23:59:59.000Z

459

Pretreatment Technology Plan  

SciTech Connect

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

460

Chemical Hygiene and Safety Plan  

E-Print Network (OSTI)

Safety Plan m Chemical$torase Guidelines Chemical Is Incompatible llll i With ii Hydrocarbons (such as butane, propane,

Ricks Editor, R.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The NABIR Strategic Plan 2001  

E-Print Network (OSTI)

Strategic Plan has greatly benefited from input from many individuals including the staff of BER and the DOE

Various

2001-01-01T23:59:59.000Z

462

Sheraton Seattle Hotel Floor Plans  

Science Conference Proceedings (OSTI)

139th Annual Meeting & Exhibition. Sheraton Seattle Hotel Floor Plans. MEETING ROOMS. RESTROOMS. LEVEL 1. LEVEL. MEETING INFORMATION.

463

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PROGRAM .4 Organizational Structure ..4 Management Quality Assurance Functions 5 Planning 5 2.0 PERSONNEL TRAINING AND

Waste Management Group

2006-01-01T23:59:59.000Z

464

Climate Action Plan (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

465

Project Management Plan  

SciTech Connect

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

466

Mobile systems capability plan  

Science Conference Proceedings (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

467

Future land use plan  

Science Conference Proceedings (OSTI)

The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

NONE

1995-08-31T23:59:59.000Z

468

Human Factors Considerations in New Nuclear Power Plants: Detailed Analysis.  

Science Conference Proceedings (OSTI)

This Nuclear Regulatory Commission (NRC) sponsored study has identified human-performance issues in new and advanced nuclear power plants. To identify the issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were organized into seven high-level HFE topic areas: Role of Personnel and Automation, Staffing and Training, Normal Operations Management, Disturbance and Emergency Management, Maintenance and Change Management, Plant Design and Construction, and HFE Methods and Tools. The issues where then prioritized into four categories using a 'Phenomena Identification and Ranking Table' methodology based on evaluations provided by 14 independent subject matter experts. The subject matter experts were knowledgeable in a variety of disciplines. Vendors, utilities, research organizations and regulators all participated. Twenty issues were categorized into the top priority category. This Brookhaven National Laboratory (BNL) technical report provides the detailed methodology, issue analysis, and results. A summary of the results of this study can be found in NUREG/CR-6947. The research performed for this project has identified a large number of human-performance issues for new control stations and new nuclear power plant designs. The information gathered in this project can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas through regulatory research. Addressing human-performance issues will provide the technical basis from which regulatory review guidance can be developed to meet these challenges. The availability of this review guidance will help set clear expectations for how the NRC staff will evaluate new designs, reduce regulatory uncertainty, and provide a well-defined path to new nuclear power plant licensing.

OHara,J.; Higgins, J.; Brown, W.; Fink, R.

2008-02-14T23:59:59.000Z

469

Energy Management and Conservation Plan  

E-Print Network (OSTI)

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

470

Fuzzy model in urban planning  

Science Conference Proceedings (OSTI)

This paper presents application of a fuzzy logic in urban planning. Urban environment quality evaluation is an important part of environmental planning and management. Traditional theory does not give as good evaluation as the fuzzy set theory, which ... Keywords: GIS, fuzzy logic, urban evaluation, urban planning

Jasna Pleho; Zikrija Avdagic

2008-05-01T23:59:59.000Z

471

Libraries and Cultural Business Plan  

E-Print Network (OSTI)

Results Adequacy Gap 2007CARL Aggregate AdequacyGap 2010Target Adequacy Gap 2013Target Adequacy Gap and graduate students with financial support to cover Open Access author fees. #12;Business Plan 2009-2013Libraries and Cultural Resources 2009-2013 Business Plan #12;Business Plan 2009-2013 ­ Libraries

Habib, Ayman

472

TEACHING PLAN FOR BUSINESS MARKETING  

E-Print Network (OSTI)

and demographic trends. Technological evolution 1 30 Work on Marketing Plan: Macroenvironment 2 30 8 Session 6 on Marketing Plan: Macroenvironment 2 30 9 Seminar 3 Friday 28 January Case preparation 1 30 Case study: Textiles Garcia 55 Work on Marketing Plan: Macroenvironment 2 30 #12;Class preparation T Activity in class

Catalonia, Technical University of

473

Energy Conservation and Development Plan. Southern Tier Central Region, New York  

DOE Green Energy (OSTI)

A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

Not Available

1979-07-01T23:59:59.000Z

474

UMTRA water sampling and analysis plan, Lakeview, Oregon  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide background, guidance, and justification for water sampling activities for the Lakeview, Oregon, Uranium Mill Tailings Remedial Action (UMTRA) processing and disposal sites. This water sampling and analysis plan will form the basis for groundwater sampling and analysis work orders (WSAWO) to be implemented during 1993. Monitoring at the former Lakeview processing site is for characterization purposes and in preparation for the risk assessment, scheduled for the fall of 1993. Compliance monitoring was conducted at the disposal site. Details of the sampling plan are discussed in Section 5.0.

Not Available

1993-09-29T23:59:59.000Z

475

WECC 10-Year Plan general presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What...

476

Acceptance Test Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Acceptance Test Plan Acceptance Test Plan This template is used to document the plan for performing the systems acceptance test, the roles and responsibilities of individuals...

477

NERSC Strategic Plan Is Now Online  

NLE Websites -- All DOE Office Websites (Extended Search)

of Advanced Scientific Computing Research as input for ASCR's long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and...

478

Human Capital Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Human Capital Plan More Documents & Publications Strategic Use of Human Capital DOE Strategic Human Capital Plan (FY 2011 - 2015) Energy.gov Careers & Internships For Staff &...

479

Emergency planning | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Emergency planning Subscribe to RSS - Emergency planning Emergency Planning involves determining, in advance, what will be done in response to specific emergencies including...

480

Details Details... The Impact of Market Rules on Emerging "Green" Energy Markets  

NLE Websites -- All DOE Office Websites (Extended Search)

1812 1812 Details, Details . . . The Impact of Market Rules on Emerging "Green" Energy Markets Ryan Wiser, Steven Pickle, and Joseph Eto Environmental Energy Technologies Division September 1998 The work described in this study was funded by the Assistant Secretary of Energy Efficiency and Renewable Energy, Office of Utility Technologies of the U.S. Department of Energy under Contract No. DE-AC03-76SF00098. For the sake of this paper, green power is defined as electricity that is differentiated based on its environmental attributes. 1 As a practical matter, nearly all such green power products include renewable energy. To the extent that customer purchases of green power offset conventional power supply, net environmental gains can be expected. 1 ABSTRACT

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-05-01T23:59:59.000Z

482

BUDGET DETAILS BOOK FOUR DPRMN OF N RGY U.S. Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BUDGET DETAILS BUDGET DETAILS BOOK FOUR DPRMN OF N RGY U.S. Department of Energy Transition Team Budget Book Office of the Chief Financial Officer Office of Budget 1. Budget Overview 2. Funding Tables and Charts 3. Appropriations Subcommittees 4. Program Overviews 5. Major Construction Projects, Activities, and Initiatives 6. Laboratory and State Data Acronyms commonly used in budget documents. ACI American Competitiveness Initiative AEI Advanced Energy Initiative AFP Approved Funding Program (monthly financial plan that dictates how funding is to be executed) AlP Accelerator Improvement Project Ames Ames National Laboratory ANL Argonne National Laboratory B&R Budget and Reference Code BA Budget Authority BAPL Bettis Atomic Power Laboratory BNL Brookhaven National Laboratory BO Budget Outlay

483

EVENT PLANNING USING FUNCTION ANALYSIS  

SciTech Connect

Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the INL Guide for Hosting an Event. Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning with the primary focus on the participant gives us the edge.

Lori Braase; Jodi Grgich

2011-06-01T23:59:59.000Z

484

EERE Postdoctoral Research Awards: News Archives NewsDetail  

NLE Websites -- All DOE Office Websites (Extended Search)

News Archives NewsDetail to someone by E-mail Share EERE Postdoctoral Research Awards: News Archives NewsDetail on Facebook Tweet about EERE Postdoctoral Research Awards: News...

485

EM Lays Out Details of Proposed Reorganization | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Lays Out Details of Proposed Reorganization EM Lays Out Details of Proposed Reorganization December 8, 2011 - 12:00pm Addthis WASHINGTON, D.C. - EM Acting Assistant Secretary...

486

Strategic plan for infrastructure optimization  

SciTech Connect

This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

Donley, C.D.

1998-05-27T23:59:59.000Z

487

1997 Consumption and Expenditures-Detailed Data Tables  

U.S. Energy Information Administration (EIA)

1997 Resdiential Energy Consumption Survey(RECS)-1997 Consumption and Expenditures-1997 Detailed Tables, Energy Information Administration

488

NREL: Technology Transfer - Updated Report Details an Emerging ...  

Updated Report Details an Emerging CPV Industry January 5, 2010. In November, the National Renewable Energy Laboratory ... Technology Transfer Home;

489

Housing Characteristics Detailed Tables - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration. United States Department of Energy 1997 RESIDENTIAL ENERGY CONSUMPTION SURVEY HOUSING CHARACTERISTICS DETAILED DATA TABLES (FINAL)

490

Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2003  

SciTech Connect

This report presents results obtained from detailed hydrologic characterization of the unconfined aquifer system conducted at the Hanford Site.

Spane, Frank A.; Newcomer, Darrell R.

2004-09-13T23:59:59.000Z

491

FY 1994 Annual Work Plan  

SciTech Connect

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

1993-09-30T23:59:59.000Z

492

Environmental Management System Plan  

SciTech Connect

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

493

ESnet Program Plan 1994  

Science Conference Proceedings (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

494

TEPP Planning Brochure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Following the completion of the assessment process Following the completion of the assessment process and the remedying of any identified improvement areas, a training tabletop drill or an exercise involving applicable emergency response organizations should be conducted. The drill or exercise will help to evaluate current emergency responder readiness. GUIDANCE FOR PLANNING, CONDUCTING AND EVALUATING TRANSPORTATION EXERCISES: This guide assists local, state, tribal and federal agencies in conducting tabletops, drills and exercises for transportation emergencies. Tabletops, drills and exercises facilitate a learning environment where response agencies can come together to understand and talk through an integrated response for a radiological transportation emergency. The accident scenarios provided with this manual may be modified to

495

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

496

Navy Geothermal Plan  

SciTech Connect

Domestic geothermal resources with the potential for decreasing fossil fuel use and energy cost exist at a significant number of Navy facilities. The Geothermal Plan is part of the Navy Energy R and D Program that will evaluate Navy sites and provide a technical, economic, and environmental base for subsequent resource use. One purpose of the program will be to provide for the transition of R and D funded exploratory efforts into the resource development phase. Individual Navy geothermal site projects are described as well as the organizational structure and Navy decision network. 2 figs.

1984-12-01T23:59:59.000Z

497

SOLID WASTE MANAGEMENT PLAN  

E-Print Network (OSTI)

ACKNOWLEDGMENTS The Chelan County Public Works Department would like to thank the following organizations and individuals for their assistance in the development of this plan: ? Chelan Countys Solid Waste Council members, past and present, and the municipalities they represent. ? Chelan Countys Solid Waste Advisory Committee members, past and present, and the agencies and businesses they represented. ? the ChelanDouglas Health District staff. ? Washington Department of Ecology staff. Chelan County residents and businesses also contributed to this document through comments provided during public meetings and through various other channels. The Board of County Commissioners and the Public Works Department gratefully acknowledge this input by the

unknown authors

2007-01-01T23:59:59.000Z

498

Transportation Business Plan  

SciTech Connect

The Transportation Business Plan is a step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and describing requirements of the transportation system. Included in the document are strategies for procuring shipping casks and transportation support services. In the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle.

1986-01-01T23:59:59.000Z

499

Detailed Description of Data for Texas' Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas  

E-Print Network (OSTI)

This is the report for detailed description of data what was used in the research for Senate Bill 5: Texas Emissions Reduction Plan (TERP). Basically this report is a manual for attached CD-ROM. The attached CD-ROM contains all data, documents, figures and spreadsheets that were used for this research. All files were categorized and divided into several folders in the CD-ROM. The detailed accomplishments and progress to date for the project are also able to access from the annual report to the Texas Natural Resource Conservation Commission which is included in the CDROM.

Im, P.; Haberl, J. S.; Ahmad, M.

2002-01-01T23:59:59.000Z

500

Ten Year Site Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the...