National Library of Energy BETA

Sample records for detailed planning kicks

  1. Detailed Planning Kicks Off | OpenEI Community

    Open Energy Info (EERE)

    Detailed Planning Kicks Off Home > Groups > Linked Open Data Workshop in Washington, D.C. Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 06:53 planning...

  2. National Clean Energy Business Plan Competition Kicks Off With Cleantech

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forum | Department of Energy Clean Energy Business Plan Competition Kicks Off With Cleantech Forum National Clean Energy Business Plan Competition Kicks Off With Cleantech Forum June 11, 2014 - 5:55pm Addthis Student teams network during the Cleantech Forum in Washington, D.C. The forum was part of the National Clean Energy Business Plan Competition. | Energy Department photo Student teams network during the Cleantech Forum in Washington, D.C. The forum was part of the National Clean Energy

  3. planning | OpenEI Community

    Open Energy Info (EERE)

    planning Home Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 07:53 Detailed Planning Kicks Off planning Skype call this morning to discuss details. More...

  4. PROJECT MANGEMENT PLAN EXAMPLES Prepare Detailed Work Packages Examples

    Office of Environmental Management (EM)

    Detailed Work Packages Examples Example 71 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical standards, instructions, procedures, and other control documentation commensurate with the complexity and risk posed by the task. The calibration program governs the process that ensures quality of the calibration and maintenance of process monitoring equipment. Equipment found to be out of calibration is tagged and

  5. Kick-Off Speakers

    Broader source: Energy.gov [DOE]

    The kick-off speakers at Monday's networking event are Minh Le, Director of the DOE SunShot Initiative, and Tom Tait, Mayor of the City of Anaheim.

  6. Memorandum: FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" |

    Energy Savers [EERE]

    Department of Energy FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" Memorandum: FY 2014 through FY 2018 Initial Budget Formulation "Kick-Off" From: Teresa Tyborowski, Acting Deputy Assistant Secretary for Program Planning & Budget (EM-60) Subject: Fiscal Years 2014 through 2018 Initial Budget Formulation "Kick-Off" The purpose of this memorandum is to "kick-off" the Office of Environmental Management's (EM) fiscal years (FY) 2014

  7. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  8. Quasiperiodically kicked quantum systems

    SciTech Connect (OSTI)

    Milonni, P.W.; Ackerhalt, J.R.; Goggin, M.E.

    1987-02-15

    We consider a two-state system kicked quasiperiodically by an external force. When the two kicking frequencies assumed for the force are incommensurate, there can be quantum chaos in the sense that (a) the autocorrelation function of the state vector decays, (b) the power spectrum of the state vector is broadband, and (c) the motion on the Bloch sphere is ergodic. The time evolution of the state vector is nevertheless dynamically stable in the sense that memory of the initial state is retained. We also consider briefly the kicked quantum rotator and find, in agreement with Shepelyansky (Physica 8D, 208 (1983)), that the quantum localization effect is greatly weakened by the presence of two incommensurate driving frequencies.

  9. Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model Trieu Mai, Clayton Barrows, Anthony Lopez, Elaine Hale, Mark Dyson, and Kelly Eurek National Renewable Energy Laboratory Technical Report NREL/TP-6A20-63972 April 2015 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the

  10. Kicking the Tires | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kicking the Tires September 12, 2008 On Thursday, we heard a colloquium presentation from Barry Barish of Caltech, who leads the global efforts on the International Linear Collider. This, if built, would justifiably warrant the description "Mega-project." Barry's presentation impressed many. What is even more interesting is why Barry was here. He put it directly in the introduction to his talk: "We are here to kick the tires." Now often that's fine, unless you are a tire. And

  11. Vadose zone transport field study: Detailed test plan for simulated leak tests

    SciTech Connect (OSTI)

    AL Ward; GW Gee

    2000-06-23

    The US Department of Energy (DOE) Groundwater/Vadose Zone Integration Project Science and Technology initiative was created in FY 1999 to reduce the uncertainty associated with vadose zone transport processes beneath waste sites at DOE's Hanford Site near Richland, Washington. This information is needed not only to evaluate the risks from transport, but also to support the adoption of measures for minimizing impacts to the groundwater and surrounding environment. The principal uncertainties in vadose zone transport are the current distribution of source contaminants and the natural heterogeneity of the soil in which the contaminants reside. Oversimplified conceptual models resulting from these uncertainties and limited use of hydrologic characterization and monitoring technologies have hampered the understanding contaminant migration through Hanford's vadose zone. Essential prerequisites for reducing vadose transport uncertainly include the development of accurate conceptual models and the development or adoption of monitoring techniques capable of delineating the current distributions of source contaminants and characterizing natural site heterogeneity. The Vadose Zone Transport Field Study (VZTFS) was conceived as part of the initiative to address the major uncertainties confronting vadose zone fate and transport predictions at the Hanford Site and to overcome the limitations of previous characterization attempts. Pacific Northwest National Laboratory (PNNL) is managing the VZTFS for DOE. The VZTFS will conduct field investigations that will improve the understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. Ideally, these methods will capture the extent of contaminant plumes using existing infrastructure (i.e., more than 1,300 steel-cased boreholes). The objectives of the VZTFS are to conduct controlled transport experiments at well-instrumented field sites at Hanford to: identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project.

  12. Meeting Materials: Consent-Based Siting Initiative Kick-off Meeting |

    Energy Savers [EERE]

    Department of Energy Initiative Kick-off Meeting Meeting Materials: Consent-Based Siting Initiative Kick-off Meeting The Consent-Based Siting Initiative's "kick-off meeting" was held on January 20, 2016 in Washington, DC. Dr. Lynn Orr, Undersecretary for Science and Energy, provided the keynote, followed by a panel discussion on DOE's planning activities for an integrated waste management system and a consent-based approach to siting. The panel answered questions from the audience,

  13. Better Buildings Workforce Peer Exchange Call: Kick-off | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Call: Kick-off Better Buildings Workforce Peer Exchange Call: Kick-off Better Buildings Workforce Peer Exchange Call: Kick-off Call Slides and Discussion Summary. April 21, 2011....

  14. Better Buildings Working with Utilities Peer Exchange Call: Kick...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Utilities Peer Exchange Call: Kick-off Better Buildings Working with Utilities Peer Exchange Call: Kick-off Better Buildings Working with Utilities Peer Exchange Call:...

  15. Implications of Model Structure and Detail for Utility Planning. Scenario Case Studies using the Resource Planning Model

    SciTech Connect (OSTI)

    Mai, Trieu; Barrows, Clayton; Lopez, Anthony; Hale, Elaine; Dyson, Mark; Eurek, Kelly

    2015-04-23

    We examine how model investment decisions change under different model configurations and assumptions related to renewable capacity credit, the inclusion or exclusion of operating reserves, dispatch period sampling, transmission power flow modeling, renewable spur line costs, and the ability of a planning region to import and export power. For all modeled scenarios, we find that under market conditions where new renewable deployment is predominantly driven by renewable portfolio standards, model representations of wind and solar capacity credit and interactions between balancing areas are most influential in avoiding model investments in excess thermal capacity. We also compare computation time between configurations to evaluate tradeoffs between computational burden and model accuracy. From this analysis, we find that certain advanced dispatch representations (e.g., DC optimal power flow) can have dramatic adverse effects on computation time but can be largely inconsequential to model investment outcomes, at least at the renewable penetration levels modeled. Finally, we find that certain underappreciated aspects of new capacity investment decisions and model representations thereof, such as spur lines for new renewable capacity, can influence model outcomes particularly in the renewable technology and location chosen by the model. Though this analysis is not comprehensive and results are specific to the model region, input assumptions, and optimization-modeling framework employed, the findings are intended to provide a guide for model improvement opportunities.

  16. Vadose Zone Transport Field Study: Detailed Test Plan for Simulated Leak Tests

    SciTech Connect (OSTI)

    Ward, Anderson L.; Gee, Glendon W.

    2000-06-23

    This report describes controlled transport experiments at well-instrumented field tests to be conducted during FY 2000 in support of DOE?s Vadose Zone Transport Field Study (VZTFS). The VZTFS supports the Groundwater/Vadose Zone Integration Project Science and Technology Initiative. The field tests will improve understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. These methods will capture the extent of contaminant plumes using existing steel-cased boreholes. Specific objectives are to 1) identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford?s waste disposal sites; 2) reduce uncertainty in conceptual models; 3) develop a detailed and accurate data base of hydraulic and transport parameters for validation of three-dimensional numerical models; and 4) identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. Pacific Northwest National Laboratory (PNNL) manages the VZTFS for DOE.

  17. Neutrino mixing anarchy: Alive and kicking (Journal Article) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Neutrino mixing anarchy: Alive and kicking Citation Details In-Document Search Title: Neutrino mixing anarchy: Alive and kicking Authors: de Gouvêa, André ; Murayama, Hitoshi Publication Date: 2015-07-01 OSTI Identifier: 1198550 Grant/Contract Number: FG02-91ER40684; AC03-76SF00098 Type: Published Article Journal Name: Physics Letters. Section B Additional Journal Information: Journal Volume: 747; Journal Issue: C; Journal ID: ISSN 0370-2693 Publisher: Elsevier Sponsoring Org:

  18. 2013 Tribal Renewable Energy Webinar Series to Kick Off January...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Tribal Renewable Energy Webinar Series to Kick Off January 30 2013 Tribal Renewable Energy Webinar Series to Kick Off January 30 January 24, 2013 - 3:52pm Addthis In response to ...

  19. Secretary of Energy to Kick Off "Energizing America for Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Kick Off "Energizing America for Energy Security" Tour Secretary of Energy to Kick Off "Energizing America for Energy Security" Tour June 9, 2005 - 2:28pm Addthis Will Speak ...

  20. Science on Saturday lecture series kicks off with tribute to...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    discussed "Consciousness and the Social Brain" at the kick-off of Science on Saturday ... discussed "Consciousness and the Social Brain" at the kick-off of Science on Saturday ...

  1. Better Buildings Workforce Peer Exchange Call: Kick-off

    Broader source: Energy.gov [DOE]

    Better Buildings Workforce Peer Exchange Call: Kick-off Call Slides and Discussion Summary. April 21, 2011.

  2. NERSC Kicks Off 40th Anniversary with 2014 Supercomputer Calendar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kicks Off 40th Anniversary with 2014 Supercomputing Calendar NERSC Kicks Off 40th Anniversary with 2014 Supercomputer Calendar Downloadable PDF features supercomputing images and trivia from Berkeley Lab's archives December 23, 2013 NERSC is kicking off a year-long celebration of its 40th anniversary with a free, downloadable 2014 calendar that takes a unique look back at the center's supercomputing history. Located at Lawrence Livermore National Laboratory from 1974-1996, NERSC was originally

  3. NNSA Administrator Kicks Off DOE's 'Feds Feed Families' Campaign |

    Office of Environmental Management (EM)

    Department of Energy Administrator Kicks Off DOE's 'Feds Feed Families' Campaign NNSA Administrator Kicks Off DOE's 'Feds Feed Families' Campaign June 16, 2011 - 12:00am Addthis WASHINGTON, D.C. - National Nuclear Security Administration (NNSA) Administrator Thomas P. D'Agostino today helped the Department of Energy (DOE) kick off its third annual "Feds Feed Families" campaign to assist local food banks in replenishing supplies during the summer months. DOE and NNSA, in partnership

  4. Energy Secretary Bodman Kicks Off "Energizing America for Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home" Energy Secretary Bodman Kicks Off "Energizing America for Energy Security" ...

  5. DOE Durability Working Group June 2010 Kick-Off Meeting Minutes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Kick-Off Meeting Minutes DOE Durability Working Group June 2010 Kick-Off Meeting Minutes Minutes from Durability Working Group June 2010 Kick-off meeting sponsored by DOE Fuel...

  6. Secretary Chu to Kick-off the Electric Drive Transportation Associatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Kick-off the Electric Drive Transportation Association's Innovation Motorcade Secretary Chu to Kick-off the Electric Drive Transportation Association's Innovation Motorcade...

  7. WWSIS Phase 2 Kick-off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WWSIS Phase 2 Kick-off WWSIS Phase 2 Kick-off May 20, 2011 - 10:55am Addthis This is an excerpt from the Second Quarter 2011 edition of the Wind Program R&D Newsletter. On March 16, 2011, DOE's National Renewable Energy Laboratory hosted a kick-off meeting for Phase 2 of the Western Wind and Solar Integration Study (WWSIS). The first phase of WWSIS identified the operating impacts of penetration levels at up to 35% of wind and solar energy on the power system operated by the WestConnect

  8. High Impact Technology Hub- Resources for Evaluators- General Measurement and Verification Plans

    Broader source: Energy.gov [DOE]

    The HIT Catalyst conducts technology demonstrations in three main phases govern demonstrations: Site Evaluation, Selection and Project Kick-Off, Measurement and Verification Scoping and Plan...

  9. High Impact Technology HQ- Resources for Evaluators- General Measurement and Verification Plans

    Broader source: Energy.gov [DOE]

    The HIT Catalyst conducts technology demonstrations in three main phases govern demonstrations: Site Evaluation, Selection and Project Kick-Off, Measurement and Verification Scoping and Plan...

  10. ARM - Detailed Experiment Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Detailed Experiment Description Related Links TWP-ICE Home Tropical Western Pacific Home ARM Data Discovery Browse Data Post-Experiment Data Sets Weather Summary (pdf, 6M) New York Workshop Presentations Experiment Planning TWP-ICE Proposal Abstract Detailed Experiment Description Science Plan (pdf, 1M) Operations Plan (pdf, 321K) Maps Contact Info Related Links Daily Report Report Archives Press Media Coverage TWP-ICE Fact Sheet (pdf, 211K) Press Releases TWP-ICE Images ARM flickr site

  11. DOE Announces Webinars on Kick-Starting an Energy Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Energy Department will present a live webinar titled "Kick-Starting Your Energy Management Program" on Tuesday, January 7, from 3:00 p.m. to 4:00 p.m. Eastern Standard Time. ...

  12. Catalysis Working Group Kick-Off Meeting Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arlington, VA - May 14, 2012 Catalysis Working Group Kick-off Meeting Co-Chairs: Piotr Zelenay Los Alamos National Laboratory Nancy L. Garland U.S. Department of Energy 2 2...

  13. Catalysis Working Group Kick-Off Meeting Agenda

    Broader source: Energy.gov [DOE]

    Agenda for the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington, Virginia.

  14. Ronald E. Hatcher Science on Saturday Lecture Series kicks off...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ronald E. Hatcher Science on Saturday Lecture Series kicks off Jan. 9 By Jeanne Jackson DeVoe December 21, 2015 Tweet Widget Google Plus One Share on Facebook Michael Graziano, a...

  15. Secretaries Bodman & Johanns Kick Off Renewable Energy Conference with

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $17.5 Million for Biofuels Research & Development Grants | Department of Energy Bodman & Johanns Kick Off Renewable Energy Conference with $17.5 Million for Biofuels Research & Development Grants Secretaries Bodman & Johanns Kick Off Renewable Energy Conference with $17.5 Million for Biofuels Research & Development Grants October 11, 2006 - 1:27pm Addthis ST. LOUIS, MO - U.S. Department of Agriculture (USDA) Secretary Mike Johanns and U.S. Department of Energy (DOE)

  16. DOE's 2016 Tribal Energy and Economic Development Webinar Series Kicks

    Energy Savers [EERE]

    Off Jan. 27 | Department of Energy DOE's 2016 Tribal Energy and Economic Development Webinar Series Kicks Off Jan. 27 DOE's 2016 Tribal Energy and Economic Development Webinar Series Kicks Off Jan. 27 January 14, 2016 - 5:06pm Addthis The U.S. Department of Energy (DOE) Office of Indian Energy, in partnership with the Western Area Power Administration, is continuing its sponsorship of DOE's monthly tribal webinar series in 2016. Part of DOE's coordinated efforts to provide education and

  17. Energy Department Kicks Off MHK Technologies Coding Challenge | Department

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy Energy Department Kicks Off MHK Technologies Coding Challenge Energy Department Kicks Off MHK Technologies Coding Challenge December 11, 2013 - 12:00am Addthis With more than 50% of the nation's population living within 50 miles of coastlines, we have vast potential to provide clean, renewable electricity to communities and cities across the United States using marine and hydrokinetic (MHK) technologies. To help this emerging industry develop new models and tools that improve the

  18. Kick-Starting the School Year with Operation Clean Desert

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 10, 2012 Kick-Starting the School Year with Operation Clean Desert School is back in session and Operation Clean Desert was there to give it a kick start! On August 21, 2012, the Operation Clean Desert Teacher's Guide made its debut along with the recently revised companion activity book during the 2012 Educator Appreciation Day & Back To School Fair at The Mirage in Las Vegas, NV. Hundreds of teachers attended the event (hosted by MGM Resorts International) and approximately 150

  19. EV Everywhere Grand Challenge Kick-Off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Off EV Everywhere Grand Challenge Kick-Off Agenda for the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI PDF icon framing_workshop_agenda_062112.pdf More Documents & Publications EV Everywhere Grand Challenge Overview Presentation EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing Workshop Report Out & Lessons Learned

  20. Energy Department Kicks Off Inaugural Collegiate Wind Competition |

    Office of Environmental Management (EM)

    Department of Energy Kicks Off Inaugural Collegiate Wind Competition Energy Department Kicks Off Inaugural Collegiate Wind Competition January 10, 2013 - 1:53pm Addthis This is an excerpt from the Fourth Quarter 2012 edition of the Wind Program R&D Newsletter. Washington, D.C. - The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory recently issued a request for proposals (RFP) to participate in DOE's inaugural National Collegiate Wind Competition. The National

  1. Innovative Facility Kicks Off First Experiment to Transform Building Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance | Department of Energy Facility Kicks Off First Experiment to Transform Building Energy Performance Innovative Facility Kicks Off First Experiment to Transform Building Energy Performance April 14, 2014 - 5:51pm Addthis Dr. David Danielson, Assistant Secretary for Energy Efficiency and Renewable Energy (second from left), tours FLEXLAB with Lawrence Berkeley National Laboratory officials in California today. FLEXLAB is the only facility in the nation that allows researchers and

  2. ARM - RACORO Flight Details

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RACORO Flight Details Related Links RACORO Home AAF Home ARM Data Discovery Browse Data Post-Campaign Data Sets Data Guide (PDF, 1.4MB) Campaign Journal Flight Details Images ARM flickr site Deployment Operations Measurements Science & Operations Plan (PDF, 640K) SGP Data Plots RACORO wiki Login Required Experiment Planning Steering Committee Science Questions RACORO Proposal Abstract Full Proposal (PDF, 886K) Collaborations Meetings CLOWD Working Group News Discovery Channel Earth Live Blog

  3. National Clean Energy Business Plan Competition Kicks Off With...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Related Articles Hyliion from Carnegie Mellon University won the 2015 top student DOE cleantech entrepreneur prize. Who will win in 2016? Universities Provide Pipeline of Talent, ...

  4. Better Buildings Working with Utilities Peer Exchange Call: Kick-off

    Broader source: Energy.gov [DOE]

    Better Buildings Working with Utilities Peer Exchange Call: Kick-off Call Slides and Discussion Summary, April 21, 2011.

  5. Governor Kicks Off Energy Education Initiative in Colorado - News Releases

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | NREL Governor Kicks Off Energy Education Initiative in Colorado February 11, 2004 Golden, Colo. - Gov. Bill Owens today kicked off an education initiative by several Colorado organizations to raise awareness of the importance of energy, science, mathematics and technology education in Colorado schools. In a celebration of Colorado Energy Education Day, Gov. Owens launched the Renewable Energy and Energy Efficiency on Wheels (RnE2EW) program at the State Capitol. RnE2EW is the product of a

  6. Green Workforce Development for Youth Kicks Off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Development for Youth Kicks Off Green Workforce Development for Youth Kicks Off October 18, 2010 - 11:00am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Every time Jonathan Norton walks into a room now and flips the switch, he can't help but think about how the lights were wired. Or how the framing was installed. And if the insulation is efficient. "A lot of people hear about green construction," says Norton, a 21-year-old California Conservation

  7. Catalyst Working Group Kick-off Meeting: Personal Commentary

    Broader source: Energy.gov [DOE]

    Personal commentary on future directions in fuel cell electrocatalysis, presented by Mark Debe, 3M, at the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington, Virginia.

  8. General Davis kicks the tires on a Safeguards Transporter | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration Davis kicks the tires on a Safeguards Transporter | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press

  9. Pantex signing ceremony kicks off wind farm project | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration signing ceremony kicks off wind farm project | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo

  10. Pantex kicks off United Way campaign | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration kicks off United Way campaign | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our

  11. Secretary Chu to Kick-off the Electric Drive Transportation Association's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation Motorcade | Department of Energy to Kick-off the Electric Drive Transportation Association's Innovation Motorcade Secretary Chu to Kick-off the Electric Drive Transportation Association's Innovation Motorcade April 18, 2011 - 12:00am Addthis WASHINGTON - Tuesday, April, 19, 2011, U.S. Energy Secretary Steven Chu will help kick-off the Electric Drive Transportation Association Annual Conference by participating in the Innovation Motorcade, an all electric vehicle motorcade that

  12. Kick Off Meeting for New Fuel Cell Projects - Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Kick Off Meeting for New Fuel Cell Projects - Golden Field Office Kick Off Meeting for New Fuel Cell Projects - Golden Field Office These slides were presented at the 2010 New Fuel Cell Projects Meeting on September 28, 2010. PDF icon 2_reporting_kleen.pdf More Documents & Publications Kick-Off Meeting for New Fuel Cell Projects Kickoff Meeting for New Fuel Cell Projects DOE Fuel Cell Subprogram (Presentation)

  13. Kick-Off Meeting for New Fuel Cell Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kick-Off Meeting for New Fuel Cell Projects Kick-Off Meeting for New Fuel Cell Projects Presented at the Department of Energy Fuel Cell Projects Kickoff Meeting, September 1 - October 1, 2009 PDF icon peterson_doe-golden_kickoff.pdf More Documents & Publications Kickoff Meeting for New Fuel Cell Projects Kick Off Meeting for New Fuel Cell Projects - Golden Field Office DOE Fuel Cell Pre-Solicitiation Workshop Participants List

  14. Colorado Kicks Off Home Energy Score Program to Benefit Home Buyers,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sellers | Department of Energy Colorado Kicks Off Home Energy Score Program to Benefit Home Buyers, Sellers Colorado Kicks Off Home Energy Score Program to Benefit Home Buyers, Sellers September 22, 2015 - 1:50pm Addthis Colorado Kicks Off Home Energy Score Program to Benefit Home Buyers, Sellers Joan Glickman Senior Advisor & Program Manager, Home Energy Score Program, Building Technologies Office What are the key facts? This month, through its Better Buildings Colorado program,

  15. DOE Durability Working Group June 2010 Kick-Off Meeting Minutes |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 0 Kick-Off Meeting Minutes DOE Durability Working Group June 2010 Kick-Off Meeting Minutes Minutes from Durability Working Group June 2010 Kick-off meeting sponsored by DOE Fuel Cell Technologies Program. PDF icon durability_working_group_minutes_june_2010.pdf More Documents & Publications DOE Durability Working Group February 2013 Meeting Agenda Advanced Cathode Catalysts DOE Durability Working Group June 2014

  16. Catalysis Working Group Kick-Off Meeting: May 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kick-Off Meeting: May 2012 Catalysis Working Group Kick-Off Meeting: May 2012 The Catalysis Working Group held a kick-off meeting May 14, 2012, in Arlington, Virginia, in conjunction with the DOE Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting. Agenda Catalysis Working Group Kick-off Meeting Agenda Presentations DOE's Fuel Cell Catalyst R&D Activities, Nancy Garland, U.S. Department of Energy Fuel Cells: Just a Dream - or Future Reality, Nenad Markovic,

  17. Navarro Kicks Off New Environmental Programs Services Contract at Nevada National Security Site

    Broader source: Energy.gov [DOE]

    LAS VEGAS – The Nevada National Security Site (NNSS) this month kicked off a new environmental programs services contract with Navarro Research and Engineering.

  18. Better Buildings Data and Evaluation Peer Exchange Kick-off Call to Discuss Key Topics for Peer- to -Peer Discussions, Call Slides and Discussion Summary, May 12, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12, 2011 BetterBuildings Data and Evaluation Peer Exchange Call Kick-Off Call Call Slides and Discussion Summary Agenda * Call logistics and Roll Call * Discussion Questions:  What were your experiences/lessons learned in aggregating and reporting information?  What type of evaluation (outside of for the purposes of reporting) are you doing/planning on doing? Information to support it? * Next steps  Future call topics  Call frequency, format, etc. 6/24/2014 2 Participating Grant

  19. Energy Department Officials Kick Off National Energy Action Month

    Broader source: Energy.gov [DOE]

    Energy Secretary Ernest Moniz will kick off National Energy Action Month, October 2014, with events in New York and Texas to highlight President Obama’s recent proclamation calling on stakeholders across the country to work together to combat climate change while spurring job creation and a low-carbon energy future. Throughout the month of October, Secretary Moniz and other Energy Department officials will participate in events across the country to emphasize the important role that the Administration’s all-of-the-above energy strategy plays in strengthening America’s economic, environmental and national security future.

  20. Vice President Biden Kicks Off Five Days of Earth Day Activities with

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcement of Major New Energy Efficiency Effort | Department of Energy Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort April 21, 2010 - 12:00am Addthis Washington, D.C. -- Vice President Biden will today kick off five days of Administration events around the 40th anniversary of Earth Day with the announcement of the

  1. NERSC's 40th Anniversary Kicks Off with a Special User Group Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    40th Anniversary Kicks Off with a Special User Group Meeting NERSC's 40th Anniversary Kicks Off with a Special User Group Meeting January 15, 2014 by Francesca Verdier Registration is now open for NUG 2014, the annual meeting of the NERSC Users' Group, Feb. 3-6, 2014. This year's NUG meeting is special, it kicks off NERSC's 40th anniversary celebration. The highlight of NUG 2014 is a two-day "Celebration of Science and Technology" featuring talks by Berkeley Lab's Horst Simon and Kathy

  2. Clean Energy Projects Kick Off U.S.-China Collaborative R&D Initiative |

    Office of Environmental Management (EM)

    Department of Energy Clean Energy Projects Kick Off U.S.-China Collaborative R&D Initiative Clean Energy Projects Kick Off U.S.-China Collaborative R&D Initiative July 9, 2010 - 1:00pm Addthis Washington, DC - Three clean energy technology projects resulting from a 2009 agreement between the United States and China are kicking off a new collaborative research effort that will focus on managing carbon dioxide emissions and reducing the environmental impact of energy production. The

  3. Save the Date! 2015 Small Business Kick-Off Forum, October 22, 2014

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Small and Disadvantaged Business Utilization will host the FY 2015 Small Business Kick-Off Forum at the DOE's Forrestal Building, 1000 Independence Ave SW, on October 22, 2014.

  4. DOE Kicks Off National "Change a Light, Change the World" Campaign

    Broader source: Energy.gov [DOE]

    ATLANTA, GA - U.S. Department of Energy (DOE) Assistant Secretary for Policy and International Affairs Karen A. Harbert today joined Georgia Power President and CEO Mike Garrett to kick off the...

  5. 2010 Fuel Cell Project Kick-off Welcome | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Project Kick-off Welcome 2010 Fuel Cell Project Kick-off Welcome These slides were presented at the 2010 New Fuel Cell Projects Meeting on September 28, 2010. PDF icon 1_welcome_papageorgopoulos.pdf More Documents & Publications U.S. DOE Hydrogen and Fuel Cell Activities: 2010 International Hydrogen Fuel and Pressure Vessel Forum DOE Hydrogen and Fuel Cell Overview: 2010 State and Regional Initiatives Informational Call and Meeting Series Relaunch DOE Hydrogen and Fuel Cell

  6. Jefferson Lab's Spring Science Series kicks off with Feb. 13 event |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jefferson Lab Science Series kicks off with Feb. 13 event February 9, 2001 Jefferson Lab's Spring Science Series kicks off in the CEBAF Center auditorium at 7 p.m., Tuesday, Feb. 13. Dog trainer Marilyn Sanders will discuss aspects of operant conditioning versus classical conditioning to train dogs. She will by accompanied by her adult, trained dog and untrained puppy, to assist her in demonstrating proper training techniques. Sanders has been a Merrimac Dog Training Club member since 1986.

  7. EV Everywhere Grand Challenge Kick-off Parameters and Analysis | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy off Parameters and Analysis EV Everywhere Grand Challenge Kick-off Parameters and Analysis Presentation at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI. PDF icon 4-jake.pdf More Documents & Publications EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework EV Everywhere Battery Workshop: Preliminary Target-Setting Framework EV Everywhere Consumer/Charging Workshop: Target-Setting Framework and

  8. Executive Summary: September 24, 2013 Kick Off of the Minorities in Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiative | Department of Energy Executive Summary: September 24, 2013 Kick Off of the Minorities in Energy Initiative Executive Summary: September 24, 2013 Kick Off of the Minorities in Energy Initiative In July 2013, the Secretary of Energy tasked the Office of Economic Impact and Diversity to assemble a broad group of stakeholders from across academia, non-profit organizations, policy groups, and business to begin a dialogue on the position of minority communities as it relates to the

  9. 1999 CBECS Detailed Tables

    U.S. Energy Information Administration (EIA) Indexed Site

    Commercial Buildings Energy Consumption Survey (CBECS) > Detailed Tables 1999 CBECS Detailed Tables Building Characteristics | Consumption & Expenditures Data from the 1999...

  10. 1995 Detailed Tables

    U.S. Energy Information Administration (EIA) Indexed Site

    Households, Buildings & Industry > Commercial Buildings Energy Consumption Survey > Detailed Tables 1995 Detailed Tables Data from the 1995 Commercial Buildings Energy Consumption...

  11. Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG) Kick-Off Meeting Proceedings Hilton Garden Inn-BWI,Baltimore, MD October 24, 2006

    Broader source: Energy.gov [DOE]

    Proceedings from the October 24, 2006 Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group Kick-Off Meeting.

  12. DOE Announces Webinars on Kick-Starting an Energy Management Program,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunShot Incubator Projects, and More | Department of Energy Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More DOE Announces Webinars on Kick-Starting an Energy Management Program, SunShot Incubator Projects, and More December 20, 2013 - 8:58am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however,

  13. Quantum chaos of a mixed open system of kicked cold atoms

    SciTech Connect (OSTI)

    Krivolapov, Yevgeny; Fishman, Shmuel; Ott, Edward; Antonsen, Thomas M. [Physics Department, Technion-Israel Institute of Technology, Haifa 32000 (Israel); University of Maryland, College Park, Maryland 20742 (United States)

    2011-01-15

    The quantum and classical dynamics of particles kicked by a Gaussian attractive potential are studied. Classically, it is an open mixed system (the motion in some parts of the phase space is chaotic, and in some parts it is regular). The fidelity (Loschmidt echo) is found to exhibit oscillations that can be determined from classical considerations but are sensitive to phase space structures that are smaller than Planck's constant. Families of quasienergies are determined from classical phase space structures. Substantial differences between the classical and quantum dynamics are found for time-dependent scattering. It is argued that the system can be experimentally realized by cold atoms kicked by a Gaussian light beam.

  14. Science on Saturday lecture series kicks off with tribute to PPPL engineer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and SOS host | Princeton Plasma Physics Lab Science on Saturday lecture series kicks off with tribute to PPPL engineer and SOS host By Jeanne Jackson DeVoe January 21, 2015 Tweet Widget Google Plus One Share on Facebook Michael Graziano, a psychology professor at Princeton University, discussed "Consciousness and the Social Brain" at the kick-off of Science on Saturday Jan. 10. (Photo by Elle Starkman/PPPL Office of Communications) Michael Graziano, a psychology professor at

  15. Department of Energy Kicks Off the State of Environmental Justice in

    Energy Savers [EERE]

    America 2011 Conference | Department of Energy Kicks Off the State of Environmental Justice in America 2011 Conference Department of Energy Kicks Off the State of Environmental Justice in America 2011 Conference April 27, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy, along with the U.S. Department of Agriculture, the U.S. Department of Interior, the U.S. Environmental Protection Agency, the National Small Town Alliance, the Howard University School of Law and

  16. St. Regis Mohawk Tribe Paves the Way to a Sustainable Future; Kicks Off

    Energy Savers [EERE]

    Community Solar Initiative | Department of Energy St. Regis Mohawk Tribe Paves the Way to a Sustainable Future; Kicks Off Community Solar Initiative St. Regis Mohawk Tribe Paves the Way to a Sustainable Future; Kicks Off Community Solar Initiative June 12, 2015 - 1:51pm Addthis Six photovoltaic arrays generate 32 kilowatts of energy to power 20 units at the Akwesasne Housing Authority’s (AHA) Sunrise Acres housing complex on the St. Regis Mohawk Reservation. Pictured from left to right

  17. Head of EM to Kick Off Congressional Nuclear Cleanup Caucus | Department of

    Energy Savers [EERE]

    Energy to Kick Off Congressional Nuclear Cleanup Caucus Head of EM to Kick Off Congressional Nuclear Cleanup Caucus April 22, 2013 - 12:00pm Addthis WASHINGTON, D.C. - EM Senior Advisor Dave Huizenga will provide an overview of EM's proposed fiscal year 2014 budget Thursday in the first of six briefings for the 19th annual U.S. House Nuclear Cleanup Caucus. Huizenga rolled out the $5.622 billion budget request earlier this month. The proposal, which requires approval by Congress, enables EM

  18. Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in

    Office of Environmental Management (EM)

    Energy Technology Are "Winning the Future" | Department of Energy Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in Energy Technology Are "Winning the Future" Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations in Energy Technology Are "Winning the Future" February 28, 2011 - 9:38am Addthis Dr. Arun Majumdar Dr. Arun Majumdar Jay Precourt Provostial Chair Professor, Stanford University and Former Director, Advanced Research

  19. DOE's 2015 Tribal Renewable Energy Webinar Series to Kick Off Jan. 28 |

    Office of Environmental Management (EM)

    Department of Energy DOE's 2015 Tribal Renewable Energy Webinar Series to Kick Off Jan. 28 DOE's 2015 Tribal Renewable Energy Webinar Series to Kick Off Jan. 28 December 29, 2014 - 4:48pm Addthis The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, in partnership with Western Area Power Administration, will continue its sponsorship of the Tribal Renewable Energy Webinar Series in 2015. The series is part of DOE's coordinated efforts to provide education and

  20. Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 October 8, 2015 - 2:20pm Addthis Secretary of Energy Ernest Moniz cuts the ceremonial ribbon to signal the start of U.S. Department of Energy Solar Decathlon 2015 in Irvine, California. | Photo by Matt Dozier, U.S. Department of Energy Secretary of Energy Ernest Moniz cuts the ceremonial ribbon to signal the start of U.S. Department

  1. 2012-2013 PathSci Kick-Off Event | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -2013 PathSci Kick-Off Event View larger image IMG 1944 View larger image IMG 1946 View larger image IMG 1949 View larger image IMG 1954 View larger image IMG 1955 View larger image IMG 1956 View larger image IMG 1969 View larger image IMG 1971

  2. Wakefield and RF Kicks Due to Coupler Asymmetry in TESLA-Type Accelerating Cavities

    SciTech Connect (OSTI)

    Bane, K.L.F.; Adolphsen, C.; Li, Z.; /SLAC; Dohlus, M.; Zagorodnov, I.; /DESY; Gonin, I.; Lunin, A.; Solyak, N.; Yakovlev, V.; /Fermilab; Gjonaj, E.; Weiland, T.; /Darmstadt, Tech. Hochsch.

    2008-07-07

    In a future linear collider, such as the International Linear Collider (ILC), trains of high current, low emittance bunches will be accelerated in a linac before colliding at the interaction point. Asymmetries in the accelerating cavities of the linac will generate fields that will kick the beam transversely and degrade the beam emittance and thus the collider performance. In the main linac of the ILC, which is filled with TESLA-type superconducting cavities, it is the fundamental (FM) and higher mode (HM) couplers that are asymmetric and thus the source of such kicks. The kicks are of two types: one, due to (the asymmetry in) the fundamental RF fields and the other, due to transverse wakefields that are generated by the beam even when it is on axis. In this report we calculate the strength of these kicks and estimate their effect on the ILC beam. The TESLA cavity comprises nine cells, one HM coupler in the upstream end, and one (identical, though rotated) HM coupler and one FM coupler in the downstream end (for their shapes and location see Figs. 1, 2) [1]. The cavity is 1.1 m long, the iris radius 35 mm, and the coupler beam pipe radius 39 mm. Note that the couplers reach closer to the axis than the irises, down to a distance of 30 mm.

  3. Office of Fossil Energy Kicks Off 19th Year of Mickey Leland Energy Fellowship

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy’s Mickey Leland Energy Fellowship kicked off its 19th year this June with a class of 44 undergraduate, graduate and post-graduate students joining one of the Department of Energy’s premier educational programs.

  4. Energy Secretary Bodman Kicks Off National "Easy Ways to Save Energy"

    Energy Savers [EERE]

    Campaign | Department of Energy National "Easy Ways to Save Energy" Campaign Energy Secretary Bodman Kicks Off National "Easy Ways to Save Energy" Campaign October 3, 2005 - 11:04am Addthis WASHINGTON DC - Secretary of Energy Samuel W. Bodman today unveiled a comprehensive national campaign to highlight how American families, businesses and the federal government can save energy in response to rising winter energy costs. Secretary Bodman was joined in announcing this

  5. details | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    details Title: Opening Date: Closing Date: Funding Opportunity Announcement: Contract Specialist: Details:

  6. PNNL: Publication Details

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Details Sorry, we cannot locate that Publication. Please try the Publications Database for other PNNL Publications. Powered By ERICA, PNNL's publication metadatabase Publications Search Publications Science as Art Calendar Magazines and Newsletters Pacific Northwest Technology Today DOE Pulse Additional Resources PNNL Technical Library PNNL Photo Library PNNL Brochure Library Related Links Hanford Technical Library

  7. Document Details Document Number

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Document Details Document Number Date of Document Document Title/Description [Links below to each document] D195066340 Not listed. N/A REVISIONS IN STRATIGRAPHIC NOMENCLATURE OF COLUMBIA RIVER BASALT GROUP D196000240 Not listed. N/A EPA DENIAL OF LINER LEACHATE COLLECTION SYSTEM REQUIREMENTS D196005916 Not listed. N/A LATE CENOZOIC STRATIGRAPHY AND TECTONIC EVOLUTION WITHIN SUBSIDING BASIN SOUTH CENTRAL WASHINGTON D196025993 RHO-BWI-ST-14 N/A SUPRABASALT SEDIMENTS OF COLD CREEK SYNCLINE AREA

  8. Detailed Course Module Description

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Course Module Description Module/Learning Objectives Level of Detail in Module by Audience Consumers Gen Ed/ Community College Trades 1. Energy Issues and Building Solutions High High High Learning Objectives: * Define terms of building science, ecological systems, economics of consumption * Relate building science perspective, ecology, social science * Explain historical energy and environmental issues related to buildings * Compare Site and source energy * Examine the health, safety and

  9. Calculation of the transverse kicks generated by the bends of a hollow electron lens

    SciTech Connect (OSTI)

    Stancari, Giulio

    2014-03-25

    Electron lenses are pulsed, magnetically confined electron beams whose current-density profile is shaped to obtain the desired effect on the circulating beam in high-energy accelerators. They were used in the Fermilab Tevatron collider for abort-gap clearing, beam-beam compensation, and halo scraping. A beam-beam compensation scheme based upon electron lenses is currently being implemented in the Relativistic Heavy Ion Collider at Brookhaven National Laboratory. This work is in support of a conceptual design of hollow electron beam scraper for the Large Hadron Collider. It also applies to the implementation of nonlinear integrable optics with electron lenses in the Integrable Optics Test Accelerator at Fermilab. We consider the axial asymmetries of the electron beam caused by the bends that are used to inject electrons into the interaction region and to extract them. A distribution of electron macroparticles is deposited on a discrete grid enclosed in a conducting pipe. The electrostatic potential and electric fields are calculated using numerical Poisson solvers. The kicks experienced by the circulating beam are estimated by integrating the electric fields over straight trajectories. These kicks are also provided in the form of interpolated analytical symplectic maps for numerical tracking simulations, which are needed to estimate the effects of the electron lens imperfections on proton lifetimes, emittance growth, and dynamic aperture. We outline a general procedure to calculate the magnitude of the transverse proton kicks, which can then be generalized, if needed, to include further refinements such as the space-charge evolution of the electron beam, magnetic fields generated by the electron current, and longitudinal proton dynamics.

  10. Ronald E. Hatcher Science on Saturday Lecture Series kicks off Jan. 9 |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton Plasma Physics Lab Ronald E. Hatcher Science on Saturday Lecture Series kicks off Jan. 9 By Jeanne Jackson DeVoe December 21, 2015 Tweet Widget Google Plus One Share on Facebook The U.S. Department of Energy's Princeton Plasma Physics Laboratory will ring in the New Year with the start of its popular Ronald E. Hatcher Science on Saturday Lecture Series on Saturday, Jan. 9 at 9:30 a.m. For more than 30 years, the lecture series has attracted hundreds of science enthusiasts ranging

  11. Ronald E. Hatcher Science on Saturday Lecture Series kicks off Jan. 9 |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton Plasma Physics Lab Ronald E. Hatcher Science on Saturday Lecture Series kicks off Jan. 9 By Jeanne Jackson DeVoe December 21, 2015 Tweet Widget Google Plus One Share on Facebook Michael Graziano, a neuroscientist and professor at Princeton University, discusses "Consciousness and the Social Brian," with the help of an orangutan puppet named "Kevin" in a Science on Saturday lecture in January of 2015. (Photo by Elle Starkman ) Michael Graziano, a neuroscientist

  12. Argonne Garden Club 2016 kick-off meeting | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Garden Club 2016 kick-off meeting March 15, 2016 12:00PM to 1:00PM Location Building 212, Room A157 Type Social Event Garden Club members can cultivate their own plot at Argonne or join for the gardening talk at the monthly meeting. The March meeting will discuss news for plots this year and also begin accepting applications for new gardeners to claim plots for 2016. You can print out forms and find more information at the Garden Club website. All are welcome. Refreshments provided.

  13. Mesoporous Carbons for More Kick > Archived News Stories > The Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials Center at Cornell Archived News Stories Latest News The perfect atom sandwich requires an extra layer › Cornell boasts 22 'highly cited' researchers › Postdoc brings open access issue to the table › In This Section EMC2 News Archived News Stories Mesoporous Carbons for More Kick May 1st, 2014 › Researchers tune the pore size in carbon materials for next-generation batteries Frontiers in Energy Research: April 2014 A scanning electron microscopy image shows the wavy pattern

  14. DOE National Science Bowl Kicks Off Tomorrow, April 27 | Department of

    Office of Environmental Management (EM)

    Energy Off Tomorrow, April 27 DOE National Science Bowl Kicks Off Tomorrow, April 27 April 26, 2012 - 12:11pm Addthis WASHINGTON, D.C. - Friday, April 27, through Monday, April 30, 113 regional high school and middle school championship teams from 42 states, the District of Columbia, Puerto Rico and the U.S. Virgin Islands will compete in the 22nd annual U.S. Department of Energy National Science Bowl final competition in Washington D.C. The students will be quizzed on all science

  15. DOE National Science Bowl Kicks off Saturday, April 30 | Department of

    Office of Environmental Management (EM)

    Energy off Saturday, April 30 DOE National Science Bowl Kicks off Saturday, April 30 April 28, 2011 - 12:00am Addthis WASHINGTON, D.C. - 110 regional high school and middle school championship teams from 44 states, the District of Columbia, Puerto Rico and the U.S. Virgin Islands will compete in the 21st annual U.S. Department of Energy National Science Bowl final competition in Washington D.C. April 30th through May 2nd. The students will be quizzed on all science disciplines, including

  16. Localization-Delocalization Transition in a System of Quantum Kicked Rotors

    SciTech Connect (OSTI)

    Creffield, C.E.; Hur, G.; Monteiro, T.S. [Department of Physics and Astronomy, University College London, Gower Street, London WC1E 6BT (United Kingdom)

    2006-01-20

    The quantum dynamics of atoms subjected to pairs of closely spaced {delta} kicks from optical potentials are shown to be quite different from the well-known paradigm of quantum chaos, the single {delta}-kick system. We find the unitary matrix has a new oscillating band structure corresponding to a cellular structure of phase space and observe a spectral signature of a localization-delocalization transition from one cell to several. We find that the eigenstates have localization lengths which scale with a fractional power L{approx}({Dirac_h}/2{pi}){sup -0.75} and obtain a regime of near-linear spectral variances which approximate the 'critical statistics' relation {sigma}{sub 2}(L){approx_equal}{chi}L{approx_equal}(1/2)(1-{nu})L, where {nu}{approx_equal}0.75 is related to the fractal classical phase-space structure. The origin of the {nu}{approx_equal}0.75 exponent is analyzed.

  17. TURBOVELOCITY STARS: KICKS RESULTING FROM THE TIDAL DISRUPTION OF SOLITARY STARS

    SciTech Connect (OSTI)

    Manukian, Haik; Guillochon, James; Ramirez-Ruiz, Enrico; O'Leary, Ryan M.

    2013-07-10

    The centers of most known galaxies host supermassive black holes (SMBHs). In orbit around these black holes are a centrally concentrated distribution of stars, both in single and in binary systems. Occasionally, these stars are perturbed onto orbits that bring them close to the SMBH. If the star is in a binary system, the three-body interaction with the SMBH can lead to large changes in orbital energy, depositing one of the two stars on a tightly-bound orbit, and its companion into a hyperbolic orbit that may escape the galaxy. In this Letter, we show that the disruption of solitary stars can also lead to large positive increases in orbital energy. The kick velocity depends on the amount of mass the star loses at pericenter, but not on the ratio of black hole to stellar mass, and are at most the star's own escape velocity. We find that these kicks are usually too small to result in the ejection of stars from the Milky Way, but can eject the stars from the black hole's sphere of influence, reducing their probability of being disrupted again. We estimate that {approx} 10{sup 5} stars, {approx} 1% of all stars within 10 pc of the galactic center, are likely to have had mass removed by the central black hole through tidal interaction, and speculate that these 'turbovelocity' stars will at first be redder, but eventually bluer, and always brighter than their unharassed peers.

  18. Detailed Photovoltaic Analysis Simulation Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2008-12-31

    The software calculates photovoltaic system energy and financial performance via the utilization of very detailed parameters.

  19. Free kick instead of cross-validation in maximum-likelihood refinement of macromolecular crystal structures

    SciTech Connect (OSTI)

    Pranikar, Jure [Institute Joef Stefan, Jamova 39, 1000 Ljubljana (Slovenia); University of Primorska, (Slovenia); Turk, Duan, E-mail: dusan.turk@ijs.si [Institute Joef Stefan, Jamova 39, 1000 Ljubljana (Slovenia); Center of Excellence for Integrated Approaches in Chemistry and Biology of Proteins, (Slovenia)

    2014-12-01

    The maximum-likelihood free-kick target, which calculates model error estimates from the work set and a randomly displaced model, proved superior in the accuracy and consistency of refinement of crystal structures compared with the maximum-likelihood cross-validation target, which calculates error estimates from the test set and the unperturbed model. The refinement of a molecular model is a computational procedure by which the atomic model is fitted to the diffraction data. The commonly used target in the refinement of macromolecular structures is the maximum-likelihood (ML) function, which relies on the assessment of model errors. The current ML functions rely on cross-validation. They utilize phase-error estimates that are calculated from a small fraction of diffraction data, called the test set, that are not used to fit the model. An approach has been developed that uses the work set to calculate the phase-error estimates in the ML refinement from simulating the model errors via the random displacement of atomic coordinates. It is called ML free-kick refinement as it uses the ML formulation of the target function and is based on the idea of freeing the model from the model bias imposed by the chemical energy restraints used in refinement. This approach for the calculation of error estimates is superior to the cross-validation approach: it reduces the phase error and increases the accuracy of molecular models, is more robust, provides clearer maps and may use a smaller portion of data for the test set for the calculation of R{sub free} or may leave it out completely.

  20. Energy Secretary Bodman Kicks Off "Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home"

    Broader source: Energy.gov [DOE]

    WHEAT RIDGE, COLORADO - Secretary of Energy Samuel W. Bodman today kicked off the "Energizing America for Energy Security" Tour with a visit to Habitat for Humanity's first "true net-zero energy...

  1. Better Buildings Workforce Peer Exchange Call: Kick-off Call Slides and Discussion Summary. April 21, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Peer Exchange Call: Kick-off Call Slides and Discussion Summary Agenda * What are peer exchange calls? * Call logistics and attendance * Key workforce topics * Grant project go-around: * What aspects of your workforce program are you focused on now? * Are you using national certification programs? If so, which one(s)? * What are some key challenges or needs you have related to workforce? * Any successful strategies? * Next steps  Future call topics, call frequency, format, etc.

  2. Better Buildings Working with Utilities Peer Exchange Call: Kick-off Call Slides and Discussion Summary, April 21, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Utilities Peer Exchange Call: Kick-off Call Slides and Discussion Summary Agenda * What are peer exchange calls? * Call logistics and attendance * Key topics in working with utilities * Grant project go-around: * What is the institutional relationship between your BB project and utilities? * What kind of utility are you working with (e.g., municipal, investor-owned, etc.)? * What are some key challenges or needs related to working with utilities? * Any successful strategies? * Next

  3. Interpreting short gamma-ray burst progenitor kicks and time delays using the host galaxy-dark matter halo connection

    SciTech Connect (OSTI)

    Behroozi, Peter S.; Ramirez-Ruiz, Enrico; Fryer, Christopher L.

    2014-09-10

    Nearly 20% of short gamma-ray bursts (sGRBs) have no observed host galaxies. Combining this finding with constraints on galaxies' dark matter halo potential wells gives strong limits on the natal kick velocity distribution for sGRB progenitors. For the best-fitting velocity distribution, one in five sGRB progenitors receives a natal kick above 150 km s{sup 1}, consistent with merging neutron star models but not with merging white dwarf binary models. This progenitor model constraint is robust to a wide variety of systematic uncertainties, including the sGRB progenitor time-delay model, the Swift redshift sensitivity, and the shape of the natal kick velocity distribution. We also use constraints on the galaxy-halo connection to determine the host halo and host galaxy demographics for sGRBs, which match extremely well with available data. Most sGRBs are expected to occur in halos near 10{sup 12} M {sub ?} and in galaxies near 5 10{sup 10} M {sub ?} (L {sub *}); unobserved faint and high-redshift host galaxies contribute a small minority of the observed hostless sGRB fraction. We find that sGRB redshift distributions and host galaxy stellar masses weakly constrain the progenitor time-delay model; the active versus passive fraction of sGRB host galaxies may offer a stronger constraint. Finally, we discuss how searches for gravitational wave optical counterparts in the local universe can reduce follow-up times using these findings.

  4. Understanding compact object formation and natal kicks. IV. The case of IC 10 X-1

    SciTech Connect (OSTI)

    Wong, Tsing-Wai; Valsecchi, Francesca; Ansari, Asna; Kalogera, Vassiliki; Fragos, Tassos; McClintock, Jeffrey; Glebbeek, Evert E-mail: francesca@u.northwestern.edu E-mail: tfragos@cfa.harvard.edu E-mail: ansari@ldeo.columbia.edu

    2014-08-01

    The extragalactic X-ray binary IC 10 X-1 has attracted attention as it is possibly the host of the most massive stellar-mass black-hole (BH) known to date. Here we consider all available observational constraints and construct its evolutionary history up to the instant just before the formation of the BH. Our analysis accounts for the simplest possible history, which includes three evolutionary phases: binary orbital dynamics at core collapse, common envelope (CE) evolution, and evolution of the BH-helium star binary progenitor of the observed system. We derive the complete set of constraints on the progenitor system at various evolutionary stages. Specifically, right before the core collapse event, we find the mass of the BH immediate progenitor to be ? 31 M{sub ?} (at 95% of confidence, same hereafter). The magnitude of the natal kick imparted to the BH is constrained to be ? 130 km s{sup 1}. Furthermore, we find that the 'enthalpy' formalism recently suggested by Ivanova and Chaichenets is able to explain the existence of IC 10 X-1 without the need to invoke unreasonably high CE efficiencies. With this physically motivated formalism, we find that the CE efficiency required to explain the system is in the range of ? 0.6-1.

  5. Department of Energy Office of Energy Efficiency and Renewable Energy Tribal Energy Program FY2002 Project Kick-Off Meeting

    Office of Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy TRIBAL ENERGY PROGRAM FY2002 Projects Kick-off Meeting Denver Marriott City Center Hotel 1701 California Street Denver, CO 80202 Tuesday, October 1, 2002 8:30 a.m. - 5:00 p.m. AGENDA TIME DESCRIPTION: PRESENTER 8:30 a.m. Welcoming Remarks and Introductions Thomas Sacco 8:45 a.m. Program Overview Lizana K. Pierce 9:15 a.m. DOE Laboratory Overview and Resources National Renewable Energy Laboratory Roger Taylor Sandia National Laboratories Sandra

  6. Part 5: For Detailed Information | Department of Energy

    Office of Environmental Management (EM)

    5: For Detailed Information Part 5: For Detailed Information 42 U.S.C. §9601 et. seq., The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA) 40 CFR Part 300, National Oil and Hazardous Substance Pollution Contingency Plan (NCP) (March 1990) Executive Order 12580: Superfund Implementation DOE Order 5400.4: CERCLA Requirements Policy on Decommissioning of Department of Energy

  7. Race to Zero Competition Details and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Buildings » Zero Energy Ready Home » Student Competition » Race to Zero Competition Details and Requirements Race to Zero Competition Details and Requirements The Race to Zero is an annual competition, open to students and faculty from any interested collegiate institution. The competition is based on a real-world scenario where a builder needs to update an existing product line (house plan) to a high-performance house design or is developing a new high-performance home product

  8. Electric Power detailed State data

    Gasoline and Diesel Fuel Update (EIA)

    Detailed State Data Final annual data for 2014 Release Date: October 21, 2015 Next Release Date: October 15, 2016 January 13, 2016 Revision/Corrections Annual data format 1990 - 2014 Net Generation by State by Type of Producer by Energy Source (EIA-906, EIA-920, and EIA-923)1 XLS 1990 - 2014 Fossil Fuel Consumption for Electricity Generation by Year, Industry Type and State (EIA-906, EIA-920, and EIA-923)2 XLS 1990 - 2013 Existing Nameplate and Net Summer Capacity by Energy Source, Producer Type

  9. Agenda for the Consent-Based Siting Initiative Kick-off Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    followed by a panel discussion on DOE's planning activities for an integrated waste management system and a consent-based approach to siting. There will be an opportunity for...

  10. Detailed Course Module Description | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detailed Course Module Description Detailed Course Module Description This document lists the course modules for building science courses offered at Cornell's Collaborator...

  11. tech details | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tech details Available Technologies Partnerships and Licensing Success Stories Contact Us For more information Contact Us

  12. WECC 10-Year Plan general presentation

    Broader source: Energy.gov (indexed) [DOE]

    Bradley Nickell Director of Transmission Planning - WECC Western Interconnection Planning in the Western Interconnection DOE Congestion Study Workshop December 13, 2011 2 Subregional Planning Groups 3 * WECC Regional Transmission Plan o High level, interconnection-wide * Subregional Planning Group plans o Detailed plans, reliability centered * State and provincial regulatory activities o What's being submitted and approved * Utility plans (transmission, resource) o Local needs from the load

  13. WREP Mitigation Action Plan

    Broader source: Energy.gov (indexed) [DOE]

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  14. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  15. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  16. Test Plan for Solvent Extraction Data Acquisition to Support...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts Citation Details In-Document Search Title: Test Plan for Solvent Extraction Data ...

  17. LCLS-schedul_run-II_10_05_6-detail.xls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Run II Detailed Schedule, May 6-September 13, 2010 Thurs Fri Sat Sun Mon Tues Wed BL Prop Spokesperson PI Planned ActivityExperiment Title POC AD Program Deputy Week 1 6-May...

  18. BISICLES Captures Details of Retreating Antarctic Ice

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BISICLES Captures Details of Retreating Antarctic Ice BISICLES Captures Details of Retreating Antarctic Ice March 30, 2013 Contact: Linda Vu, lvu@lbl.gov, +1 510 495 2402 Satellite observations suggest that the shrinking West Antarctic ice sheet is contributing to global sea level rise. But until recently, scientists could not accurately model the physical processes driving retreat of the ice sheet. Now, a new ice sheet model-called Berkeley-ISICLES (BISICLES)-is shedding light on these details.

  19. Central Plateau Principles Public Involvement Advice DETAILED...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    v0, 12914 Central Plateau Principles Public Involvement Advice DETAILED BACKGROUND Cleanup of Hanford's Central Plateau is expected to take another four decades or longer, and...

  20. U.S. Department of Energy 2012 Strategic Sustainability Performance Plan

    Broader source: Energy.gov [DOE]

    This document details the U.S. Department of Energy's 2012 strategic sustainability performance plan.

  1. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  2. First Detailed Look at RNA Dicer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Detailed Look at RNA Dicer First Detailed Look at RNA Dicer Print Wednesday, 25 January 2006 00:00 Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a

  3. Wind Energy Multiyear Program Plan for 2007-2012

    SciTech Connect (OSTI)

    None

    2009-01-18

    Detailed plan for the Wind Energy Program's activities from 2007-1012, including goals, targets, and barriers.

  4. ITEP Clean Power Plan and Tribes Training

    Broader source: Energy.gov [DOE]

    The Institute of Environmental Professionals (ITEP) is hosting a Clean Power Plan and Tribes training provides detailed information for tribes to understand the Clean Power Plan and how it applies to their tribal lands.

  5. First Detailed Look at RNA Dicer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team...

  6. Recent content in Linked Open Data Workshop in Washington, D...

    Open Energy Info (EERE)

    Recent content in Linked Open Data Workshop in Washington, D.C. Home Name Post date sort icon Type Detailed Planning Kicks Off Jweers 27 Sep 2012 - 06:53 Blog entry Notes from the...

  7. ForA Request Detail Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ForA Request Detail Page 1 of2 Freedom Of Information Act Electronic FOIA Request Detail Request Number: Name: Organization: Address: Country: Phone Number: Fax Number: E-mail: 20121203070924543 Karen Troutman Dewey Publications Inc. 1840 Wilson Blvd. Suite 203 Arlington, VA 22201 United States 703-524-1355 703-524-1463 troutman.deweypublications@gmail.com Reasonably Describe Records: Description: Pursuant to the Freedom of Information Act, you are requested to provide the name and email address

  8. FreedomCAR and fuel partnership plan

    SciTech Connect (OSTI)

    None, None

    2006-03-01

    Plan that details the research effort necessary to develop the technologies to reduce dependence of the nation's personal transportation system on imported oil and minimize harmful vehicle emissions.

  9. Environmental monitoring plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  10. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan » Strategic Plan Strategic Plan The Lab's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Communications & Government Affairs (505) 667-7000 strategic plan 2014 Strategic Plan (pdf) Our plan for fulfilling our mission to solve national security challenges through scientific excellence

  11. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Disability Plans Disability Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Disability Plans The Lab offers employees both Short-term and Supplemental Disability plans through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources Defined Benefit Eligibility Disability

  12. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  13. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  14. First Detailed Look at RNA Dicer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Detailed Look at RNA Dicer Print Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to

  15. First Detailed Look at RNA Dicer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Detailed Look at RNA Dicer Print Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to snip

  16. First Detailed Look at RNA Dicer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First Detailed Look at RNA Dicer Print Scientists have gotten their first detailed look at the molecular structure of an enzyme that Nature has been using for eons to help silence unwanted genetic messages. A team of researchers with Berkeley Lab and the University of California, Berkeley, used x-ray crystallography at ALS Beamlines 8.2.1 and 8.2.2 to determine the crystal structure of Dicer, an enzyme that plays a critical role in a process known as RNA interference. The Dicer enzyme is able to

  17. Detailed Drawings of NERSC File Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File System Drawing Detailed Drawings of NERSC File Systems Legend Note that "Fiber Channel" are multiple 1-1 direct connections between multiple devices, we use a cloud here to simplify the representations. Hopper Scratch Project Global Scratch Last edited: 2016-02-01 08:06:28

  18. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our synchrotron,

  19. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Dental Plan Proper dental care plays an important role in your overall health. That's why the Lab offers employees and their eligible dependents free dental coverage through Delta Dental of California. In addition to free preventive care, the plan offers both in and out of network coverage. The

  20. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  1. 1999 Commercial Building Characteristics--Detailed Tables--Principal...

    U.S. Energy Information Administration (EIA) Indexed Site

    Principal Building Activities > Detailed Tables-Principal Building Activities Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Principal Building Activities Table B1....

  2. 1999 Commercial Building Characteristics--Detailed Tables--Year...

    U.S. Energy Information Administration (EIA) Indexed Site

    Year Constructed > Detailed Tables-Year Constructed Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Year Constructed Table B8. Year Constructed, Number of Buildings...

  3. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Lab offers employees a 401(k) retirement plan. This plan allows you to save and invest a piece of your paycheck before taxes are taken out. Taxes are not paid until the...

  4. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S....

  5. Task Plans

    Office of Environmental Management (EM)

    TEC Work Plan (begun 392) J. Holm 799 Updating, maintenance and revamping of the Work Plan is an integral part of the TEC process itself and is not by itself a substantive DOE...

  6. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans, Procedures Plans, Procedures The following plans and procedures are cited in environmental reports prepared by the Laboratory. Contact Environmental Communication & Public Involvement Email Environmental Plans & Procedures DISCLAIMER: The following is a list of procedures (titles and numbers) cited in reports that have been prepared by the Laboratory's Associate Directorate for Environmental Management (ADEM). To view each procedure, visit the Electronic Public Reading Room (EPRR)

  7. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  8. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  9. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's retirement is necessary to prepare the machine room for the new system. At this point in our planning we can say that Franklin will retire no sooner than April 30. Additional announcements will be made with more details when a firm date is set. If you are currently only using Franklin you should start migrating to

  10. Detailed Chemical Kinetic Modeling of Cyclohexane Oxidation

    SciTech Connect (OSTI)

    Silke, E J; Pitz, W J; Westbrook, C K; Ribaucour, M

    2006-11-10

    A detailed chemical kinetic mechanism has been developed and used to study the oxidation of cyclohexane at both low and high temperatures. Reaction rate constant rules are developed for the low temperature combustion of cyclohexane. These rules can be used for in chemical kinetic mechanisms for other cycloalkanes. Since cyclohexane produces only one type of cyclohexyl radical, much of the low temperature chemistry of cyclohexane is described in terms of one potential energy diagram showing the reaction of cyclohexyl radical + O{sub 2} through five, six and seven membered ring transition states. The direct elimination of cyclohexene and HO{sub 2} from RO{sub 2} is included in the treatment using a modified rate constant of Cavallotti et al. Published and unpublished data from the Lille rapid compression machine, as well as jet-stirred reactor data are used to validate the mechanism. The effect of heat loss is included in the simulations, an improvement on previous studies on cyclohexane. Calculations indicated that the production of 1,2-epoxycyclohexane observed in the experiments can not be simulated based on the current understanding of low temperature chemistry. Possible 'alternative' H-atom isomerizations leading to different products from the parent O{sub 2}QOOH radical were included in the low temperature chemical kinetic mechanism and were found to play a significant role.

  11. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    --------------------------Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process. 

  12. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2014) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals play a key role in

  13. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals play a key role in

  14. strategic-plan-for-advanced-model-development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan for Advanced Model Development at CMAP Kermit Wies List of Authors ================ Kermit Wies Chicago Metropolitan Agency for Planning 312 386 8820 This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract ========= The CMAP modeling cadre (under contract) is preparing a detailed multi-year plan for establishing advanced travel modeling in the Chicago region. A feature of the plan will be a schedule for pursuing development of

  15. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  16. Ancillary-service details: Dynamic scheduling

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1997-01-01

    Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

  17. 1999 Commercial Building Characteristics--Detailed Tables--Census...

    U.S. Energy Information Administration (EIA) Indexed Site

    Census Region > Detailed Tables-Census Region Complete Set of 1999 CBECS Detailed Tables Detailed Tables-Census Region Table B3. Census Region, Number of Buildings and Floorspace...

  18. Blundell 2 Power Plant Details | Open Energy Information

    Open Energy Info (EERE)

    Power Plant Details Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Blundell 2 Power Plant Details Author Geothermal Energy Association Published...

  19. A Stochastic Reactor Based Virtual Engine Model Employing Detailed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detailed Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment A Stochastic Reactor Based Virtual Engine Model Employing Detailed Chemistry for ...

  20. Improving Combustion Software to Solve Detailed Chemical Kinetics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combustion Software to Solve Detailed Chemical Kinetics for HECC Improving Combustion Software to Solve Detailed Chemical Kinetics for HECC 2012 DOE Hydrogen and Fuel Cells Program...

  1. FY 2007/2008 Contractor Performance Plan, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2006-10-03

    This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

  2. ITEP Training on Clean Power Plan and Tribes

    Broader source: Energy.gov [DOE]

    The Institute of Environmental Professionals (ITEP) is hosting a Clean Power Plan and Tribes training provides detailed information for tribes to understand the Clean Power Plan and how it applies to their tribal lands. The course will include instructional presentations and facilitated class discussions. Topics include what is the clean power plan, how the clean power plan affects tribes, and more.

  3. DOE Releases Climate Change Technology Program Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan, which details measures to accelerate the development and reduce the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions. ...

  4. Climate Action Planning: A Review of Best Practices, Key Elements...

    Open Energy Info (EERE)

    a climate action plan. The report includes detailed discussion of stakeholder involvement, establishing a target date and interim targets for achieving climate neutrality,...

  5. Solvent Refined Coal-II (SRC-II) detailed environmental plan

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    This document describes environmental research which will: aid in the development of an environmentally acceptable SRC-II process; and provide data for environmental assessment of the process. The SRC-II process is described, criteria for selection of samples to undergo environmental analyses are given, and approximate timelines are presented for obtaining pertinent samples. At this time, the SRC-II process is at the pilot-plant stage of development and a demonstration facility is scheduled to begin operation in 1984. Since design criteria may change, the environmental research described in this document is organized in four phases which correlate with and will provide information early in process development. Phase I research (screening) evaluates samples from existing SRC-II facilities (pilot, process demonstration unit (PDU), bench) which may bracket potential demonstration/commercial practice in terms of physical and chemical criteria. The samples are being subjected to a battery of short-term biomedical and ecological assays. Chemical fractionation and analysis are being performed to determine compounds and compound classes of potential concern. Phase II (baseline) research will evaluate SRC-II materials which are considered most representative of potential demonstration/commercial practice. These materials will be subjected to longer-term, more-extensive biological and ecological analyses relative to effects and environmental fate. Phase III research will examine effects of process modification, control technologies and changing operational conditions on potential environmental properties of SRC-II materials. Phase IV research (onsite monitoring) will develop methods and initiate environmental monitoring for effects at the SRC-II demonstration facility and potential commercial sites. This document also describes industrial hygiene programs which must occur throughout SRC-II process development.

  6. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of Environment, Health, Safety and Security (AU). At the heart of this document lie our core values, vision and mission statements, 4 goals, and 11 key strategic objectives. It represents a truly collaborative effort. The values, vision, mission, goals and key strategies resulting from this process were shared and revised

  7. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  8. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  9. POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September 12, 2010, requires agencies to officially document detail actions. As a result, all Servicing Human Resources Offices (SHROs) are now required to document, process, and file certain specific detail actions in CHRIS. PDF icon POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details

  10. Emergency Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emergency Plan Emergency

  11. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  12. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  13. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  14. Resource Planning Guide

    Energy Science and Technology Software Center (OSTI)

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  15. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity

  16. Savannah River Site Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  17. 1999 Commercial Building Characteristics--Detailed Tables--Size...

    U.S. Energy Information Administration (EIA) Indexed Site

    Complete Set of 1999 CBECS Detailed Tables Detailed Tables- of Buildings Table B6. Building Size, Number of Buildings b6.pdf (PDF file), b6.xls (Excel spreadsheet file), b6.txt...

  18. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Two Studies Reveal Details of Lithium-Battery Function Print Wednesday, 27 February 2013 00:00 Our way of life is deeply...

  19. Mammoth Pacific II Power Plant Details | Open Energy Information

    Open Energy Info (EERE)

    Power Plant Details Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Mammoth Pacific II Power Plant Details Abstract Additional information: The Mammoth...

  20. Human Factors Considerations in New Nuclear Power Plants: Detailed Analysis.

    SciTech Connect (OSTI)

    OHara,J.; Higgins, J.; Brown, W.; Fink, R.

    2008-02-14

    This Nuclear Regulatory Commission (NRC) sponsored study has identified human-performance issues in new and advanced nuclear power plants. To identify the issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were organized into seven high-level HFE topic areas: Role of Personnel and Automation, Staffing and Training, Normal Operations Management, Disturbance and Emergency Management, Maintenance and Change Management, Plant Design and Construction, and HFE Methods and Tools. The issues where then prioritized into four categories using a 'Phenomena Identification and Ranking Table' methodology based on evaluations provided by 14 independent subject matter experts. The subject matter experts were knowledgeable in a variety of disciplines. Vendors, utilities, research organizations and regulators all participated. Twenty issues were categorized into the top priority category. This Brookhaven National Laboratory (BNL) technical report provides the detailed methodology, issue analysis, and results. A summary of the results of this study can be found in NUREG/CR-6947. The research performed for this project has identified a large number of human-performance issues for new control stations and new nuclear power plant designs. The information gathered in this project can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas through regulatory research. Addressing human-performance issues will provide the technical basis from which regulatory review guidance can be developed to meet these challenges. The availability of this review guidance will help set clear expectations for how the NRC staff will evaluate new designs, reduce regulatory uncertainty, and provide a well-defined path to new nuclear power plant licensing.

  1. LFRG Execution Plan | Department of Energy

    Energy Savers [EERE]

    Execution Plan LFRG Execution Plan This Execution Plan (EP) provides guidance for performing Low-Level Waste Disposal Facility Federal Review Group (LFRG) member duties and responsibilities supporting DOE M435.1-1, and subsequent revisions and in fulfilling DOE's Atomic Energy Act (AEA) authority for self-regulation. DOE M435.1-1 and this EP details the framework within which the LFRG performs its regulatory oversight responsibilities. The EP identifies: the qualifications and responsibilities

  2. Detail Shot Of Mira | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Detail Shot Of Mira Download original image « Back to galleryItem 3 of 4« Previous | Next

  3. Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2003

    SciTech Connect (OSTI)

    Spane, Frank A.; Newcomer, Darrell R.

    2004-09-13

    This report presents results obtained from detailed hydrologic characterization of the unconfined aquifer system conducted at the Hanford Site.

  4. FY 2014 Funding History Detail Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget » FY 2014 Budget Justification » FY 2014 Funding History Detail Spreadsheet FY 2014 Funding History Detail Spreadsheet File FY 2014 Funding History Detail Spreadsheet (3.5 MB) More Documents & Publications Residential Clothes Washers (Appendix J2) FY 2014 Budget Request Statistical Table Report 20.4: Lumen and Chromaticity Maintenance of LED PAR38 Lamps

  5. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  6. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  7. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  8. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in

  9. High performance computing and communications: FY 1997 implementation plan

    SciTech Connect (OSTI)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  10. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -2020 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In

  11. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  12. Letter from Commonwealth of Virginia to ENSR International Detailing...

    Broader source: Energy.gov (indexed) [DOE]

    Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Potomac Electric Power Company's Motion to...

  13. Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling

    Energy Savers [EERE]

    and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S. | Department of Energy Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S. Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S. Pumped Storage Hydropower (Detailed Analysis to Demonstrate Value)-Modeling and Analysis of Value of Advanced Pumped

  14. Trends in Commercial Buildings--Total Primary Energy Detail

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Consumption and Graph Total Primary Energy Consumption Graph Detail and Data Table 1979 to 1992 primary consumption trend with 95% confidence ranges 1979 to 1992 primary...

  15. Trends in Commercial Buildings--Total Site Energy Detail

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Consumption and Graph Total Site Energy Consumption Graph Detail and Data Table 1979 to 1992 site consumption trend with 95% confidence ranges 1979 to 1992 site...

  16. Premiere issue of "Quest" magazine details PPPL's strides toward...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Premiere issue of "Quest" magazine details PPPL's strides toward fusion energy and advances in plasma science September 5, 2013 Tweet Widget Google Plus One Share on Facebook Quest...

  17. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell...

  18. Detailed Assessment of Particulate Characteristics from Low-Temperatur...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion Engines ... Program Annual Merit Review and Peer Evaluation Meeting PDF icon ...

  19. Overview of Detailed Chemical Speciation and Particle Sizing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diesel Exhaust, Both Real Time and Filter Based Measurements Overview of Detailed Chemical Speciation and Particle Sizing for Diesel Exhaust, Both Real Time and Filter Based ...

  20. ARM-UAV TWP-ICE Payload Instrumentation Details

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Payload Instrumentation Details McCoy, Robert Sandia National Laboratories Tooman, Tim Sandia National Laboratories McFarquhar, Greg University of Illinois Category: Field...

  1. Residential Windows and Window Coverings: A Detailed View of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    View of the Installed Base and User Behavior Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior Includes information about the ...

  2. Ribosome research in atomic detail offers potential insights...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ribosome research offers potential insights into cancer Ribosome research in atomic detail offers potential insights into cancer, anemia, Alzheimer's A groundbreaking study of the...

  3. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  4. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  5. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  6. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  7. Save Energy Now Assessments Results 2008 Detailed Report

    SciTech Connect (OSTI)

    Wright, Anthony L; Martin, Michaela A; Nimbalkar, Sachin U; Quinn, James; Glatt, Ms. Sandy; Orthwein, Mr. Bill

    2010-09-01

    In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

  8. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Digital Data Management Plans Digital Data Management Plans Investigating the field of high energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)

  9. National Highway Planning Network

    Energy Science and Technology Software Center (OSTI)

    1992-02-02

    NHPN, the National Highway Planning Network, is a database of major highways in the continental United States that is used for national-level analyses of highway transportation issues that require use of a network, such as studies of highway performance, network design, social and environmental impacts of transportation, vehicle routing and scheduling, and mapping. The network is based on a set of roadways digitized by the U. S. Geological Survey (USGS) from the 1980 National Atlasmore » and has been enhanced with additional roads, attribute detail, and topological error corrections to produce a true analytic network. All data have been derived from or checked against information obtained from state and Federal governmental agencies. Two files comprise this network: one describing links and the other nodes. This release, NHPN1.0, contains 44,960 links and 28,512 nodes representing approximately 380,000 miles of roadway.« less

  10. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  11. Department of Energy Releases Details of Tribal Summit | Department of

    Office of Environmental Management (EM)

    Energy Details of Tribal Summit Department of Energy Releases Details of Tribal Summit April 26, 2011 - 12:00am Addthis WASHINGTON, D.C. - U.S. Department of Energy today released details of the upcoming Tribal Summit with American Indian and Alaska Native Leaders that will be held on May 4-5, 2011, at the Crystal City Gateway Marriott in Arlington, Va. The summit will build on Secretary Chu's continued commitment to partnering with Native Americans to support the development of clean energy

  12. TRI-PARTY AGREEMENT HANFORD PUBLIC INVOLVEMENT PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    state law. So I think that the two agencies, other than the DOE, should stick to their guns in following their own rules and not letting this federal agency kick them down the...

  13. Production Planning Model

    Energy Science and Technology Software Center (OSTI)

    1998-04-20

    PRODMOD is an integrated computational tool for performing dynamic simulation and optimization for the entire high level waste complex at the Savannah River Site (SRS) It is being used at SRS for planning purposes so that all waste can be processed efficiently. The computational tool 1) optimizes waste blending sequences, 2) minimizes waste volume production, 3) reduces waste processing time, 4) provides better process control and understanding, and 5) assists strategic planning, scheduling, and costmore » estimation. PRODMOD has been developed using Aspen Technology''s software development package SPEEDUP. PRODMOD models all the key HLW processing operations at SRS: storage and evaporation: saltcake production and dissolution: filtration (dewatering): precipitation: sludge and precipitate washing: glass, grout, and organics production. Innovative approaches have been used in making PRODMOD a very fast computational tool. These innovative approaches are 1) constructing a dynamic problem as a steady state problem 2) mapping between event-space (batch processes) and time-space (dynamic processes) without sacrificing the details in the batch process. The dynamic nature of the problem is constructed in linear form where time dependence is implicit. The linear constructs and mapping algorithms have made it possible to devise a general purpose optimization scheme which couples the optimization driver with the PRODMOD simulator. The optimization scheme is capable of generating single or multiple optimal input conditions for different types of objective functions over single or multiple years of operations depending on the nature of the objective function and operating constraints.« less

  14. 1999 Commercial Buildings Characteristics--Detailed Tables--Conservati...

    U.S. Energy Information Administration (EIA) Indexed Site

    as rowstubs in most detailed tables. Total buildings, total floorspace, and average building size for these categories are shown in Table B1. The PDF and spreadsheet data tables...

  15. Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2000

    SciTech Connect (OSTI)

    Spane, Frank A.; Thorne, Paul D.; Newcomer, Darrell R.

    2001-05-15

    This report provides the resluts of detailed hydrologic characterization tests conducted within eleven Hanford Site wells during fiscal year 2000. Detailed characterization tests performed included groundwater-flow characterization; barometric response evaluation; slug tests; single-well tracer tests; constant-rate pumping tests; and in-well, vertical flow tests. Hydraulic property estimates obtained from the detailed hydrologic tests include transmissivity; hydraulic conductivity; specific yield; effective porosity; in-well, lateral flow velocity; aquifer-flow velocity; vertical distribution of hydraulic conductivity (within the well-screen section); and in-well, verticla flow velocity. In addition, local groundwater-flow characteristics (i.e., hydraulic gradient and flow direction) were determined for four sites where detailed well testing was performed.

  16. Results of Detailed Hydrologic Characterization Tests - Fiscal Year 1999

    SciTech Connect (OSTI)

    Spane, Frank A.; Thorne, Paul D.; Newcomer, Darrell R.

    2001-01-19

    This report provides the results of detailed hydrologic characterization tests conducted within newly constructed Hanford Site wells during FY 1999. Detailed characterization tests performed during FY 1999 included: groundwater flow characterization, barometric response evaluation, slug tests, single-well tracer tests, constant-rate pumping tests, and in-well vertical flow tests. Hydraulic property estimates obtained from the detailed hydrologic tests include: transmissivity, hydraulic conductivity, specific yield, effective porosity, in-well lateral flow velocity, aquifer flow velocity, vertical distribution of hydraulic conductivity (within the well-screen section) and in-well vertical flow velocity. In addition, local groundwater flow characteristics (i.e., hydraulic gradient and flow direction) were determined for four sites where detailed well testing was performed.

  17. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  18. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Two Studies Reveal Details of Lithium-Battery Function Print Wednesday, 27 February 2013 00:00 Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell phones, laptops, medical devices, and cars. As conventional lithium-ion batteries approach their theoretical energy-storage limits, new technologies are emerging to address the long-term energy-storage improvements needed for mobile

  19. A Stochastic Reactor Based Virtual Engine Model Employing Detailed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment | Department of Energy A Stochastic Reactor Based Virtual Engine Model Employing Detailed Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment A Stochastic Reactor Based Virtual Engine Model Employing Detailed Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment The model consists of an in-cylinder combustion engine model, an interconnecting exhaust

  20. Overview of Detailed Chemical Speciation and Particle Sizing for Diesel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exhaust, Both Real Time and Filter Based Measurements | Department of Energy Detailed Chemical Speciation and Particle Sizing for Diesel Exhaust, Both Real Time and Filter Based Measurements Overview of Detailed Chemical Speciation and Particle Sizing for Diesel Exhaust, Both Real Time and Filter Based Measurements 2002 DEER Conference Presentation: University of Wisconsin - Madison PDF icon 2002_deer_foster.pdf More Documents & Publications The Impact of Oil Consumption Mechanisms on

  1. Improving Combustion Software to Solve Detailed Chemical Kinetics for HECC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Combustion Software to Solve Detailed Chemical Kinetics for HECC Improving Combustion Software to Solve Detailed Chemical Kinetics for HECC 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ace076_mcnenly_2012_o.pdf More Documents & Publications Vehicle Technologies Office Merit Review 2014: Improved Solvers for Advanced Engine Combustion Simulation Improved Solvers for Advanced Engine

  2. Letter from Commonwealth of Virginia to ENSR International Detailing

    Energy Savers [EERE]

    Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC | Department of Energy of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Letter from Commonwealth of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Docket No. EO-05-01: Letter from

  3. Idaho's Advanced Mixed Waste Treatment Project Details 2013

    Office of Environmental Management (EM)

    Accomplishments | Department of Energy Idaho's Advanced Mixed Waste Treatment Project Details 2013 Accomplishments Idaho's Advanced Mixed Waste Treatment Project Details 2013 Accomplishments December 24, 2013 - 12:00pm Addthis IDAHO FALLS, Idaho - EM and its contractor, Idaho Treatment Group (ITG), safely and compliantly met all of their production and shipping targets in the Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho site in 2013. AMWTP's purpose is to safely process and

  4. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect (OSTI)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  5. Strategic Energy Planning

    Energy Savers [EERE]

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  6. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  7. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  8. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Introduction

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  9. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Appendices

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  10. Plans for an ERL Test Facility at CERN (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Plans for an ERL Test Facility at CERN Citation Details In-Document Search Title: Plans for an ERL Test Facility at CERN You are accessing a document from the Department of...

  11. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  12. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  13. LANS DB PENSION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this

  14. Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

  15. Hazardous waste operational plan for site 300

    SciTech Connect (OSTI)

    Roberts, R.S.

    1982-02-12

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.

  16. DOE - NNSA/NFO -- Photo Library Details page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Details NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Instructions: Click the photograph number or name link below the thumbnail to view the full size image Photograph details are listed on the right Refer to the Viewing Instructions and FAQs for technical help Unable to display this Web Part. To troubleshoot the problem, open this Web page in a Windows SharePoint Services-compatible HTML editor such as Microsoft Office SharePoint Designer. If the problem persists, contact

  17. Enhanced sludge washing evaluation plan

    SciTech Connect (OSTI)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices.

  18. Tax-Advantaged Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax-Advantaged Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow....

  19. FAQ Detail | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    ASCR Leadership Computing Challenge (ALCC) » FAQ Detail Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities User Facilities Accessing ASCR Facilities Innovative & Novel Computational Impact on Theory & Experiement (INCITE) ASCR Leadership Computing Challenge (ALCC) Industrial Users Computational Science Graduate Fellowship (CSGF) Research & Evaluation Prototypes (REP) Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific

  20. Guidance for Planning Exercises

    Office of Environmental Management (EM)

    Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or

  1. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  2. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Storm Water Documents Individual Permit NPDES No. NM0030759 (pdf) Storm Water Plans Site Discharge Pollution Prevention Plan (SDPPP) Volume 1 - Los AlamosPueblo...

  3. Powering the people: India's capacity expansion plans

    SciTech Connect (OSTI)

    Patel, S.

    2009-05-15

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  4. Light duty utility arm startup plan

    SciTech Connect (OSTI)

    Barnes, G.A.

    1998-09-01

    This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).

  5. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  6. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLANNING ACQUISITION PLANNING PDF icon ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Policy Flash 2013-09 Policy Flash 2015-13

  7. Underground storage tank management plan

    SciTech Connect (OSTI)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  8. Oracle accrual plans from requirements to implementation

    SciTech Connect (OSTI)

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  9. National Security Technology Incubator Operations Plan

    SciTech Connect (OSTI)

    2008-04-30

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  10. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell phones, laptops, medical devices, and cars. As conventional lithium-ion batteries approach their theoretical energy-storage limits, new technologies are emerging to address the long-term energy-storage improvements needed for mobile systems, electric vehicles in particular. Battery performance depends on the dynamics of

  11. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell phones, laptops, medical devices, and cars. As conventional lithium-ion batteries approach their theoretical energy-storage limits, new technologies are emerging to address the long-term energy-storage improvements needed for mobile systems, electric vehicles in particular. Battery performance depends on the dynamics of

  12. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell phones, laptops, medical devices, and cars. As conventional lithium-ion batteries approach their theoretical energy-storage limits, new technologies are emerging to address the long-term energy-storage improvements needed for mobile systems, electric vehicles in particular. Battery performance depends on the dynamics of

  13. Towards a detailed soot model for internal combustion engines

    SciTech Connect (OSTI)

    Mosbach, Sebastian; Celnik, Matthew S.; Raj, Abhijeet; Kraft, Markus; Zhang, Hongzhi R.; Kubo, Shuichi; Kim, Kyoung-Oh

    2009-06-15

    In this work, we present a detailed model for the formation of soot in internal combustion engines describing not only bulk quantities such as soot mass, number density, volume fraction, and surface area but also the morphology and chemical composition of soot aggregates. The new model is based on the Stochastic Reactor Model (SRM) engine code, which uses detailed chemistry and takes into account convective heat transfer and turbulent mixing, and the soot formation is accounted for by SWEEP, a population balance solver based on a Monte Carlo method. In order to couple the gas-phase to the particulate phase, a detailed chemical kinetic mechanism describing the combustion of Primary Reference Fuels (PRFs) is extended to include small Polycyclic Aromatic Hydrocarbons (PAHs) such as pyrene, which function as soot precursor species for particle inception in the soot model. Apart from providing averaged quantities as functions of crank angle like soot mass, volume fraction, aggregate diameter, and the number of primary particles per aggregate for example, the integrated model also gives detailed information such as aggregate and primary particle size distribution functions. In addition, specifics about aggregate structure and composition, including C/H ratio and PAH ring count distributions, and images similar to those produced with Transmission Electron Microscopes (TEMs), can be obtained. The new model is applied to simulate an n-heptane fuelled Homogeneous Charge Compression Ignition (HCCI) engine which is operated at an equivalence ratio of 1.93. In-cylinder pressure and heat release predictions show satisfactory agreement with measurements. Furthermore, simulated aggregate size distributions as well as their time evolution are found to qualitatively agree with those obtained experimentally through snatch sampling. It is also observed both in the experiment as well as in the simulation that aggregates in the trapped residual gases play a vital role in the soot formation process. (author)

  14. Two Studies Reveal Details of Lithium-Battery Function

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell phones, laptops, medical devices, and cars. As conventional lithium-ion batteries approach their theoretical energy-storage limits, new technologies are emerging to address the long-term energy-storage improvements needed for mobile systems, electric vehicles in particular. Battery performance depends on the dynamics of

  15. Third Climate Change Science Program Report Issued; Report Details Effects

    Office of Science (SC) Website

    of Climate Change on Energy Production and Use in the United States | U.S. DOE Office of Science (SC) Third Climate Change Science Program Report Issued; Report Details Effects of Climate Change on Energy Production and Use in the United States News News Home Featured Articles Science Headlines 2015 2014 2013 2016 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S.

  16. Detailed Assessment of Particulate Characteristics from Low-Temperature

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combustion Engines | Department of Energy Assessment of Particulate Characteristics from Low-Temperature Combustion Engines Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion Engines 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ace083_lee_2012_p.pdf More Documents & Publications Characterization of Pre-Commercial Gasoline Engine Particulates Through Advanced Aerosol

  17. Detailed HCCI Exhaust Speciation - ORNL Reference Fuel Blends | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy HCCI Exhaust Speciation - ORNL Reference Fuel Blends Detailed HCCI Exhaust Speciation - ORNL Reference Fuel Blends *Accurately measure exhaust profile from an HCCI engine with a variety of fuels and create a better understanding of HCCI engine emissions. PDF icon deer09_bunting.pdf More Documents & Publications A Comparison of HCCI Engine Performance Data and Kinetic Modeling Results over a Wide Rangeof Gasoline Range Surrogate Fuel Blends Combustion, Efficiency, and Fuel

  18. Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate

    SciTech Connect (OSTI)

    Herbinet, O; Pitz, W J; Westbrook, C K

    2007-09-17

    A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO2 production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

  19. Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate

    SciTech Connect (OSTI)

    Herbinet, O; Pitz, W J; Westbrook, C K

    2007-09-20

    A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

  20. Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate

    SciTech Connect (OSTI)

    Herbinet, Olivier; Pitz, William J.; Westbrook, Charles K.

    2008-08-15

    A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran and co-workers for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet-stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels. (author)

  1. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect (OSTI)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  2. Experimental Test Plan DOE Tidal and River Reference Turbines

    SciTech Connect (OSTI)

    Neary, Vincent S; Hill, Craig; Chamorro, Leonardo; Gunawan, Budi

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  3. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  4. Girder Alignment Plan (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Girder Alignment Plan Citation Details In-Document Search Title: Girder Alignment Plan The girders for the LCLS undulator system contain components which must be aligned with high accuracy relative to each other. The alignment is one of the last steps before the girders go into the tunnel, so the alignment must be done efficiently, on a tight schedule. This note documents the alignment plan which includes efficiency and high accuracy. The motivation for girder alignment involves the following

  5. Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding

    Energy Savers [EERE]

    Opportunity Number: DE-FOA-0000098 | Department of Energy Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 Funding Opportunity Announcement and application details. PDF icon Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding Opportunity Number: DE-FOA-0000098 More Documents & Publications DISCLAIMER: Microsoft Word -

  6. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  7. Detailed balance limit of power conversion efficiency for organic photovoltaics

    SciTech Connect (OSTI)

    Seki, Kazuhiko; Furube, Akihiro; Yoshida, Yuji

    2013-12-16

    A fundamental difference between inorganic photovoltaic (IPV) and organic photovoltaic (OPV) cells is that charges are generated at the interface in OPV cells, while free charges can be generated in the bulk in IPV cells. In OPV cells, charge generation involves intrinsic energy losses to dissociate excitons at the interface between the donor and acceptor. By taking into account the energy losses, we show the theoretical limits of the power conversion efficiency set by radiative recombination of the carriers on the basis of the detailed balance relation between radiation from the cell and black-body radiation.

  8. New Measurement Explores Fine Details of Proton Structure | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurement Explores Fine Details of Proton Structure BigCal, contained 1,744 lead glass bars The new calorimeter, called BigCal, contained 1,744 lead glass bars, such as the one shown, for detecting the scattered electrons. A collaboration of scientists is probing deep inside the proton at Jefferson Lab by measuring quantities that relate to the proton's shape and size. These so-called form factors give scientists a tool for studying the proton's inner structure. "In principle, we would

  9. Bio-butanol: Combustion properties and detailed chemical kinetic model

    SciTech Connect (OSTI)

    Black, G.; Curran, H.J.; Pichon, S.; Simmie, J.M.; Zhukov, V.

    2010-02-15

    Autoignition delay time measurements were performed at equivalence ratios of 0.5, 1 and 2 for butan-1-ol at reflected shock pressures of 1, 2.6 and 8 atm at temperatures from 1100 to 1800 K. High-level ab initio calculations were used to determine enthalpies of formation and consequently bond dissociation energies for each bond in the alcohol. A detailed chemical kinetic model consisting of 1399 reactions involving 234 species was constructed and tested against the delay times and also against recent jet-stirred reactor speciation data with encouraging results. The importance of enol chemistry is highlighted. (author)

  10. ARRA870A Recovery Act - Recip Details for Next Quarter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARRA870A Recovery Act - Recipient Reporting Details" "Data is as of July, 19, 2011" "Awardee Name","Award/ Contract Number","Award Type","Award Amount","Total Costs","Total Payments","Project Value","Project Desc","DUNS Number","CFDA Code","NAICS Code","Award Date","Contracting Office Code","Awarding Agency Code","Funding Agency

  11. Central Plateau Principles Public Involvement Advice DETAILED BACKGROUND

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    v0, 12/9/14 Central Plateau Principles Public Involvement Advice DETAILED BACKGROUND Cleanup of Hanford's Central Plateau is expected to take another four decades or longer, and cost tens of billions of dollars. The Central Plateau includes the 200 East and 200 West Areas with all of Hanford's High-Level Nuclear Waste Tank Farms, processing plants, sites where over a million gallons of High-Level Nuclear Waste has leaked from Single Shell Tanks (SSTs), and billions of gallons of waste was

  12. Electric Utility Sales and Revenue - EIA-826 detailed data file

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    826 detailed data The Form EIA-826 "Monthly Electric Utility Sales and Revenue Report with State Distributions" collects sales of electricity and associated revenue, each month, from a statistically chosen sample of electric utilities in the United States. The respondents to the Form EIA-826 are chosen from the Form EIA-861, "Annual Electric Utility Report." Methodology is based on the "Model-Based Sampling, Inference and Imputation." In 2003, EIA revised the survey

  13. A New Detailed Term Accounting Opacity Code: TOPAZ

    SciTech Connect (OSTI)

    Iglesias, C A; Chen, M H; Isaacs, W; Sonnad, V; Wilson, B G

    2004-04-28

    A new opacity code, TOPAZ, which explicitly includes configuration term structure in the bound-bound transitions is being developed. The goal is to extend the current capabilities of detailed term accounting opacity codes such as OPAL that are limited to lighter elements of astrophysical interest. At present, opacity calculations of heavier elements use statistical methods that rely on the presence of myriad spectral lines for accuracy. However, statistical approaches have been shown to be inadequate for astrophysical opacity calculations. An application of the TOPAZ code will be to study the limits of statistical methods. Comparisons of TOPAZ to other opacity codes as well as experiments are presented.

  14. Idaho National Laboratory Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  15. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  16. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  17. Aquisition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aquisition Plan Aquisition Plan This template is used for documenting the plans for acquiring hardware, software and communications equipment for a systems development project. PDF icon Aquisition Plan More Documents & Publications Feasibility Study Report Template System Design Training Plan

  18. Detailed Physical Trough Model for NREL's Solar Advisor Model: Preprint

    SciTech Connect (OSTI)

    Wagner, M. J.; Blair, N.; Dobos, A.

    2010-10-01

    Solar Advisor Model (SAM) is a free software package made available by the National Renewable Energy Laboratory (NREL), Sandia National Laboratory, and the US Department of Energy. SAM contains hourly system performance and economic models for concentrating solar power (CSP) systems, photovoltaic, solar hot-water, and generic fuel-use technologies. Versions of SAM prior to 2010 included only the parabolic trough model based on Excelergy. This model uses top-level empirical performance curves to characterize plant behavior, and thus is limited in predictive capability for new technologies or component configurations. To address this and other functionality challenges, a new trough model; derived from physical first principles was commissioned to supplement the Excelergy-based empirical model. This new 'physical model' approaches the task of characterizing the performance of the whole parabolic trough plant by replacing empirical curve-fit relationships with more detailed calculations where practical. The resulting model matches the annual performance of the SAM empirical model (which has been previously verified with plant data) while maintaining run-times compatible with parametric analysis, adding additional flexibility in modeled system configurations, and providing more detailed performance calculations in the solar field, power block, piping, and storage subsystems.

  19. Detailed characteristics of intermittent current pulses due to positive corona

    SciTech Connect (OSTI)

    Liu, Yang Cui, Xiang; Lu, Tiebing; Wang, Zhenguo; Li, Xuebao; Xiang, Yu; Wang, Xiaobo

    2014-08-15

    In order to get detailed characteristics of intermittent current pulses due to positive corona such as the repetition rate of burst-pulse trains, the peak value ratio of the primary pulse to the secondary pulse, the number of pulses per burst, and the interval of the secondary pulses, a systematic study was carried out in a coaxial conductor-cylinder electrode system with the conductor electrode being set with a discharge point. Empirical formulae for the number of pulses per burst and the interval of the secondary pulses are first presented. A theoretical model based on the motion of the space-charge clouds is proposed. Analysis with the model gives explanations to the experimental results and reveals some new insights into the physical mechanism of positive intermittent corona.

  20. Detailed photonuclear cross-section calculations and astrophysical applications

    SciTech Connect (OSTI)

    Gardner, D.G.; Gardner, M.A.; Hoff, R.W.

    1989-06-15

    We have investigated the role of an isomeric state and its coupling to the ground state (g.s.) via photons and neutron inelastic scattering in a stellar environment by making detailed photonuclear and neutron cross-section calculations for /sup 176/Lu and /sup 210/Bi. In the case of /sup 176/Lu, the g.s. would function as an excellent galactic slow- (s-) process chronometer were it not for the 3.7-h isomer at 123 keV. Our calculations predicted much larger photon cross sections for production of the isomer, as well as a lower threshold, than had been assumed based on earlier measurements. These two factors combine to indicate that an enormous correction, a factor of 10/sup 7/, must be applied to shorten the current estimate of the half-life against photoexcitation of /sup 176/Lu as a function of temperature. This severely limits the use of /sup 176/Lu as a stellar chronometer and indicates a significantly lower temperature at which the two states reach thermal equilibrium. For /sup 210/Bi, our preliminary calculations of the production and destruction of the 3 /times/ 10/sup 6/ y isomeric state by neutrons and photons suggest that the /sup 210/Bi isomer may not be destroyed by photons as rapidly as assumed in certain stellar environments. This leads to an alternate production path of /sup 207/Pb and significantly affects presently interpreted lead isotopic abundances. We have been able to make such detailed nuclear cross-section calculations using: modern statistical-model codes of the Hauser-Feshbach type, with complete conservation of angular momentum and parity; reliable systematics of the input parameters required by these codes, including knowledge of the absolute gamma-ray strength-functions for E1, M1, and E2 transitions; and codes developed to compute large, discrete, nuclear level sets, their associated gamma-ray branchings, and the presence and location of isomeric states. 7 refs., 2 figs.

  1. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  2. Sample Project Execution Plan

    Broader source: Energy.gov [DOE]

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  3. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  4. State Energy Strategic Plans

    Broader source: Energy.gov [DOE]

    Most state energy offices across the country are required to have current and long-term strategic energy management plans in place. These strategic plans help to ensure that state agencies are...

  5. Report: EM Strategic Planning

    Office of Environmental Management (EM)

    STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty

  6. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  7. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the threat of a national security or public safety disaster. ORISE incorporates a wide range of security exercises to test disaster preparedness plans, including full-function exercises, drills and tabletops to ready the U.S. Department of Energy (DOE) and other government agencies to effectively respond to emergencies.

  8. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently voted to extend its Community Commitment Plan for one year. The plan invests $3 million of the company's management fee each year in regional education, economic development and community giving programs. It is managed by LANL's Community Programs Office and was launched in 2006 when LANS won the prime contract to manage

  9. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  10. Designing a Benchmarking Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designing a Benchmarking Plan 1 DRAFT -- February 2013 DESIGNING A BENCHMARKING PLAN Introduction This guide provides a framework for developing an internal benchmarking plan. The outline walks through the various stages of the benchmarking planning process, providing tips and resources to help support organizations at each stage. Not all organizations will choose to implement each stage; however, each section is useful for consideration. 1. Establish the Goal for Benchmarking 2. Secure Buy-in

  11. EERE Strategic Plan Briefing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan Briefing 2 EERE Strategic Plan 3 Strategic Plan Input 4 Strategic Plan Implementation 5 A strong and prosperous America, powered by clean, affordable, and secure energy EERE Vision 6 To create and sustain American leadership in the transition to a global clean energy economy EERE Mission 7 EERE Organizational Principles * Economic Prosperity * Affordability * Reduced Environmental Impact * Energy Security * Consumer Choice 8 EERE Five Core Questions * Impact Is this a

  12. Public Involvement Plan Public Involvement Plan

    Energy Savers [EERE]

    Public Involvement Plan Public Involvement Plan for CERCLA Activities at the U.S. Department of Energy Oak Ridge Site for CERCLA Activities at the U.S. Department of Energy Oak Ridge Site 2 0 1 3 U p d a t e 2 0 1 3 U p d a t e ii Both the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Federal Facility Agreement require U.S. Department of Energy Oak Ridge Environmental Management (DOE-OREM) to prepare and publish a community relations plan.

  13. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect (OSTI)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  14. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  15. Mitigation Action Plan

    Office of Environmental Management (EM)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  16. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect (OSTI)

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  17. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  18. Pacific Northwest National Laboratory Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Fisher, Darrell R.; Pearson, Erik W.

    2000-12-29

    The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

  19. Project Execution Plan RM

    Office of Environmental Management (EM)

    Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of

  20. A thermoacoustic-Stirling heat engine: Detailed study

    SciTech Connect (OSTI)

    Backhaus, S.; Swift, G. W.

    2000-06-01

    A new type of thermoacoustic engine based on traveling waves and ideally reversible heat transfer is described. Measurements and analysis of its performance are presented. This new engine outperforms previous thermoacoustic engines, which are based on standing waves and intrinsically irreversible heat transfer, by more than 50%. At its most efficient operating point, it delivers 710 W of acoustic power to its resonator with a thermal efficiency of 0.30, corresponding to 41% of the Carnot efficiency. At its most powerful operating point, it delivers 890 W to its resonator with a thermal efficiency of 0.22. The efficiency of this engine can be degraded by two types of acoustic streaming. These are suppressed by appropriate tapering of crucial surfaces in the engine and by using additional nonlinearity to induce an opposing time-averaged pressure difference. Data are presented which show the nearly complete elimination of the streaming convective heat loads. Analysis of these and other irreversibilities show which components of the engine require further research to achieve higher efficiency. Additionally, these data show that the dynamics and acoustic power flows are well understood, but the details of the streaming suppression and associated heat convection are only qualitatively understood. (c) 2000 Acoustical Society of America.

  1. Detailed model for practical pulverized coal furnaces and gasifiers

    SciTech Connect (OSTI)

    Smith, P.J.; Smoot, L.D.

    1989-08-01

    This study has been supported by a consortium of nine industrial and governmental sponsors. Work was initiated on May 1, 1985 and completed August 31, 1989. The central objective of this work was to develop, evaluate and apply a practical combustion model for utility boilers, industrial furnaces and gasifiers. Key accomplishments have included: Development of an advanced first-generation, computer model for combustion in three dimensional furnaces; development of a new first generation fouling and slagging submodel; detailed evaluation of an existing NO{sub x} submodel; development and evaluation of an improved radiation submodel; preparation and distribution of a three-volume final report: (a) Volume 1: General Technical Report; (b) Volume 2: PCGC-3 User's Manual; (c) Volume 3: Data Book for Evaluation of Three-Dimensional Combustion Models; and organization of a user's workshop on the three-dimensional code. The furnace computer model developed under this study requires further development before it can be applied generally to all applications; however, it can be used now by specialists for many specific applications, including non-combusting systems and combusting geseous systems. A new combustion center was organized and work was initiated to continue the important research effort initiated by this study. 212 refs., 72 figs., 38 tabs.

  2. Detailed model for practical pulverized coal furnaces and gasifiers

    SciTech Connect (OSTI)

    Philips, S.D.; Smoot, L.D.

    1989-08-01

    The need to improve efficiency and reduce pollutant emissions commercial furnaces has prompted energy companies to search for optimized operating conditions and improved designs in their fossil-fuel burning facilities. Historically, companies have relied on the use of empirical correlations and pilot-plant data to make decisions about operating conditions and design changes. The high cost of collecting data makes obtaining large amounts of data infeasible. The main objective of the data book is to provide a single source of detailed three-dimensional combustion and combustion-related data suitable for comprehensive combustion model evaluation. Five tasks were identified as requirements to achieve the main objective. First, identify the types of data needed to evaluate comprehensive combustion models, and establish criteria for selecting the data. Second, identify and document available three-dimensional combustion data related to pulverized coal combustion. Third, collect and evaluate three-dimensional data cases, and select suitable cases based on selection criteria. Fourth, organize the data sets into an easy-to-use format. Fifth, evaluate and interpret the nature and quality of the data base. 39 refs., 15 figs., 14 tabs.

  3. NEPA litigation 1988-1995: A detailed statistical analysis

    SciTech Connect (OSTI)

    Reinke, D.C.; Robitaille, P.

    1997-08-01

    The intent of this study was to identify trends and lessons learned from litigated NEPA documents and to compare and contrast these trends among Federal agencies. More than 350 NEPA cases were collected, reviewed, and analyzed. Of the NEPA cases reviewed, more than 170 were appeals or Supreme Court cases, mostly from the late 1980s through 1995. For this time period, the sampled documents represent the majority of the appeals court cases and all the Supreme Court cases. Additionally, over 170 district court cases were also examined as a representative sample of district court decisions on NEPA. Cases on agency actions found to need NEPA documentation (but that had no documentation) and cases on NEPA documents that were found to be inadequate were pooled and examined to determine the factors that were responsible for these findings. The inadequate documents were specifically examined to determine if there were any general trends. The results are shown in detailed statistical terms. Generally, when a Federal agency has some type of NEPA documentation (e.g., CX, EA, or EIS) and at least covers the basic NEPA procedural requirements, the agency typically wins the litigation. NEPA documents that lose generally have serious errors of omission. An awareness and understanding of the errors of omission can help Federal agencies to ensure that they produce winner a greater percentage of the time.

  4. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  5. Appendix K Disposal Cell Groundwater Monitoring Plan

    Office of Legacy Management (LM)

    Disposal Cell Groundwater Monitoring Plan

  6. Institutional plan. FY 1998--2003

    SciTech Connect (OSTI)

    1997-07-01

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  7. Fort Drum integrated resource assessment. Volume 2, Baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

    1992-12-01

    The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

  8. Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail

    SciTech Connect (OSTI)

    Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

    1993-02-01

    The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

  9. Enabling Detailed Energy Analyses via the Technology Performance Exchange: Preprint

    SciTech Connect (OSTI)

    Studer, D.; Fleming, K.; Lee, E.; Livingood, W.

    2014-08-01

    One of the key tenets to increasing adoption of energy efficiency solutions in the built environment is improving confidence in energy performance. Current industry practices make extensive use of predictive modeling, often via the use of sophisticated hourly or sub-hourly energy simulation programs, to account for site-specific parameters (e.g., climate zone, hours of operation, and space type) and arrive at a performance estimate. While such methods are highly precise, they invariably provide less than ideal accuracy due to a lack of high-quality, foundational energy performance input data. The Technology Performance Exchange was constructed to allow the transparent sharing of foundational, product-specific energy performance data, and leverages significant, external engineering efforts and a modular architecture to efficiently identify and codify the minimum information necessary to accurately predict product energy performance. This strongly-typed database resource represents a novel solution to a difficult and established problem. One of the most exciting benefits is the way in which the Technology Performance Exchange's application programming interface has been leveraged to integrate contributed foundational data into the Building Component Library. Via a series of scripts, data is automatically translated and parsed into the Building Component Library in a format that is immediately usable to the energy modeling community. This paper (1) presents a high-level overview of the project drivers and the structure of the Technology Performance Exchange; (2) offers a detailed examination of how technologies are incorporated and translated into powerful energy modeling code snippets; and (3) examines several benefits of this robust workflow.

  10. DETAILED MOLECULAR OBSERVATIONS TOWARD THE DOUBLE HELIX NEBULA

    SciTech Connect (OSTI)

    Torii, K.; Enokiya, R.; Hasegawa, K.; Kudo, N.; Fukui, Y.; Morris, M. R.

    2014-07-01

    The Double Helix Nebula (DHN), located 100 pc above Sgr A* in the Galactic center (GC), is a unique structure whose morphology suggests it is a magnetic feature. Recent molecular observations toward the DHN revealed two candidate molecular counterparts of the DHN at radial velocities of 35 km s{sup 1} and 0 km s{sup 1} and discussed the model in which the DHN has its origin at the circumnuclear disk in the GC. In this paper, new CO observations toward the DHN using the Caltech Submillimeter Observatory and Mopra telescopes are presented. The higher-resolution observations of ?1 pc scale reveal the detailed distributions and kinematics of the two CO counterparts (the 0 km s{sup 1} and 35 km s{sup 1} features) and provide new information on their physical conditions. As a result, we find that the 0 km s{sup 1} feature with a mass of 3.3 10{sup 4} M {sub ?} coincides with the infrared emission of the DHN, indicating clear association with the DHN. The association of the 35 km s{sup 1} feature, with a mass of 0.8 10{sup 4} M {sub ?}, is less clear compared with the 0 km s{sup 1} feature, but the complementary distribution between the molecular gas and the DHN and velocity variation along the DHN support its association with the DHN. The two molecular features are highly excited, as shown by the relatively high CO J = 2-1/J = 1-0 intensity ratios of ?1.0, and have kinetic temperatures of ?30 K, consistent with the typical molecular clouds in the GC.

  11. Details of the FY 2014 Budget Request for FE | Department of...

    Energy Savers [EERE]

    Details of the FY 2014 Budget Request for FE Details of the FY 2014 Budget Request for FE Detailed budget justifications for the Office of Fossil Energy for FY 2014 budget request....

  12. 2016 Plan Options for Retirees

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2016 Plan Options 2016 Plan Options for Retirees Information for LANS retirees Non-Medicare retirees HDHP plan highlights (pdf) HDHP summary of benefits (pdf) PPO plan highlights (pdf) PPO summary of benefits (pdf) Plan comparison (pdf) Dental highlight sheet (pdf) Vision plan description (pdf) Vision highlight sheet (pdf) Legal highlight sheet (pdf) 2016 Rates (pdf) Medical Expense Estimator Medicare-eligible retirees EPO plan highlights (pdf) EPO summary of benefits (pdf) PPO plan highlights

  13. CANMET Gasifier Liner Coupon Material Test Plan

    SciTech Connect (OSTI)

    Mark Fitzsimmons; Alan Darby; Fred Widman

    2005-10-30

    The test plan detailed in this topical report supports Task 1 of the project titled ''Development of Technologies and Capabilities for Coal Energy Resources - Advanced Gasification Systems Development (AGSD)''. The purpose of these tests is to verify that materials planned for use in an advanced gasifier pilot plant will withstand the environments in a commercial gasifier. Pratt & Whitney Rocketdyne (PWR) has developed and designed the cooled liner test assembly article that will be tested at CANMET Energy Technology Centre (CETC-O) in Ottawa, Ontario, Canada (CETC-O). The Test Plan TP-00364 is duplicated in its entirety, with formatting changes to comply with the format required for this Topical Report. The table of contents has been modified to include the additional material required by this topical report. Test Request example and drawings of non-proprietary nature are also included as appendices.

  14. Training Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for system/software development and installation PDF icon Training Plan More Documents & Publications System Design Transition Plan Conversion Plan

  15. Transition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition Plan Transition Plan This template is used to define the objectives, resources, and plans for systems transition, e.g., scheduling the transition from acceptance testing to full operational status, identifying staffing and training needs for system operation and maintenance, planning for data migration, etc PDF icon Transition Plan More Documents & Publications System Design Feasibility Study Report Template Configuration Management Plan

  16. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  17. STANDARD REVIEW PLAN

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Safety Design Strategy January 2015 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan Safety Design Strategy Critical Decision (CD) Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Post Operation January 2015 i FOREWORD The Chief of Nuclear Safety (CNS) is developing of series of Standard Review Plans (SRPs) to provide consistent, predictable corporate review framework to ensure that issues and

  18. Plan Design Highlights for:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LEGAL NOTICES: Access federal and state legal notices related to your plan: deltadentalins.com/about/legal/index-enrollee.html 1 In Texas, Delta Dental Insurance Company offers a Dental Provider Organization (DPO) plan. 2 Enrollees are responsible for any coinsurance, deductible, amount over the plan maximum and charges for non-covered services. 3 Verify that your dentist is a contracted Delta Dental PPO network dentist before each appointment. 4 Applies only to procedures covered under your

  19. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Relations Plan Community Relations Plan The Laboratory maintains an open working relationship with communities and interested members of the public. August 1, 2013 Guests listen to Lab historian Ellen McGhee on tour of historical sites Guests listen to Laboratory historian Ellen McGhee on a tour of historical sites. What the plan does Establishes a productive government-to-government relationship with local tribes and pueblos Keeps communities and interested members of the public

  20. INL Executable Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan

  1. Flight Planning Manual

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protocol and Flight Plans Protocol for each flight: * Afternoon before the flight (~3PM): a. Determine next day's meteorology b. Decide on preliminary flight plan and discuss with pilots and other investigators * Morning of the flight (7AM) * A. re-evaluate forecast, state of aircraft, finalize flight plan with pilots and other investigators. * Mid-morning (11AM) or early-afternoon (1PM): departure on that day's flight. Within 4 hours after the return of each flight, chief scientist needs to

  2. Milestone Plan Process Improvement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we

  3. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements between the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public Involvement PO Box 1663, MS M996 Los Alamos, NM 87544 (505) 667-0216 Email We welcome your comments and suggestions on how

  4. ARM - Lesson Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Lesson Plans The Atmospheric Radiation Measurement (ARM) Climate Research Facility Education and Outreach Program creates basic science lessons related to weather and climate for K-12th grade. ARM Education strives to make lessons that

  5. Community Strategic Energy Planning

    Office of Environmental Management (EM)

    Community Strategic Energy Planning Jared Temanson National Renewable Energy Laboratory DOE Office of Indian Energy 2 o 40 hours of free technical assistance o Project development support, PCE training, energy planning o Have conducted 5 SEP workshops in the last 6 months What is Community Strategic Energy Planning? * Brings desired energy future into focus and builds consensus * Considers current reality and local resources * Considers hurdles/challenges before you reach them * Maps out

  6. DOE Retro Analysis Plan

    Office of Environmental Management (EM)

    Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for

  7. Annual NEPA Planning Summary Planned Environmental Assessments

    Office of Environmental Management (EM)

    NEPA Planning Summary Planned Environmental Assessments Ongoing Bonneville Power Administration 1/31/2014 Estimated Cost Comments Status Document or Project Title DOE NEPA Document Number Amount in $ Determination Date Completion Date Ongoing Salem-Albany Transmission Line Rebuild Project DOE/EA-1946 $750,000 10/11/2012 Oct-14 Rebuild 52 miles of wood-pole transmission line Ongoing Alvey-Fairview Transmission Line Rebuild Project DOE/EA-1891 $800,000 8/4/2011 Jun-14 Rebuild 97.5-mile wood-pole

  8. USDA & DOE Release National Biofuels Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis WASHINGTON - Department of Agriculture (USDA) Secretary Ed Schafer and Department of Energy (DOE) Secretary Samuel W. Bodman today released the National Biofuels Action Plan (NBAP), an interagency plan detailing the collaborative efforts of Federal agencies to accelerate the development of a sustainable biofuels industry. "Federal leadership can provide

  9. Microsoft Word - SEC J_Appendix C - Contractor's Transition Plan_Negotiated

    National Nuclear Security Administration (NNSA)

    C, Page 1 SECTION J APPENDIX C CONTRACTOR'S TRANSITION PLAN Plan: As attached below. Guidance: The Contractor shall submit a Transition Plan that describes the process, details, and schedule for providing an orderly transition during the Contract's Transition Term stated in Section F, F-2, Period of Performance, in accordance with the guidance herein for all elements of Section J, Appendix A, Statement of Work, Chapter II Work Scope Structure. The objectives of the Transition Plan are: to

  10. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect (OSTI)

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  11. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  12. Long Range Development Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan...

  13. PICs Implementation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOEWIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United ... Carlsbad Field Office Carlsbad, New Mexico DOEWIPP 04-2301 Passive Institutional Controls ...

  14. BPA Energy Efficiency Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

  15. planning for emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

  16. Visual Sample Plan Flyer

    Broader source: Energy.gov [DOE]

    This flyer better explains that VSP is a free, easy-to-use software tool that supports development of optimal sampling plans based on statistical sampling theory.

  17. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by Princeton ... Director, Operations Princeton Plasma Physics Laboratory December 2014 FY 2015 Site ...

  18. Planning, Budget, and Analysis

    Broader source: Energy.gov [DOE]

    Presentation on Planning, Budget, and Analysis to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004.

  19. ARM Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ER-ARM-0402 Atmospheric Radiation Measurement Program Science Plan Current Status and ... Executive Summary The Atmospheric Radiation Measurement (ARM) Program has matured ...

  20. Draft 2014 Annual Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    : Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012...

  1. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  2. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect (OSTI)

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  3. 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan PDF icon Section 999 - 2012 Annual Plan More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  4. Gen IV Materials Handbook Implementation Plan

    SciTech Connect (OSTI)

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product maintenance and enhancement. Contracting of development of the Handbook website is discussed in terms of host server options, cost, technology, developer background and cooperative nature, and company stability. One of the first and most important activities in website development will be the generation of a detailed Handbook product requirements document including case diagrams and functional requirements tables. The Implementation Plan provides a detailed overview of the organizational structure of the Handbook and details of Handbook preparation, publication, and distribution. Finally, the Implementation Plan defines Quality Assurance requirements for the Handbook.

  5. Preliminary evaluation of crisis-relocation fallout-shelter options. Volume 2. Detailed analysis

    SciTech Connect (OSTI)

    Santini, D.J.; Clinch, J.M.; Davis, F.H.; Hill, L.G.; Lynch, E.P.; Tanzman, E.A.; Wernette, D.R.

    1982-12-01

    This report presents a preliminary, detailed evaluation of various shelter options for use if the President orders crisis relocation of the US urban population because of strong expectation of a nuclear war. The availability of livable shelter space at 40 ft/sup 2/ per person (congregate-care space) by state is evaluated. Options are evaluated for construction of fallout shelters allowing 10 ft/sup 2/ per person - such shelters are designed to provide 100% survival at projected levels of radioactive fallout. The FEMA concept of upgrading existing buildings to act as fallout shelters can, in principle, provide adequate shelter throughout most of the US. Exceptions are noted and remedies proposed. In terms of upgrading existing buildings to fallout shelter status, great benefits are possible by turning away from a standard national approach and adopting a more site-specific approach. Existing FEMA research provides a solid foundation for successful crisis relocation planning, but the program can be refined by making suitable modifications in its locational, engineering, and institutionally specific elements.

  6. Strategic Energy Planning

    Broader source: Energy.gov [DOE]

    Comprehensive strategic energy planning, whether at the state, local, or tribal level, is a critical building block for sound energy management and for advancing a clean energy economy in your jurisdiction. Use these resources—including step-by-step guides, tools, templates, trends, and examples—to develop a strategic energy plan.

  7. Scalable Heuristics for Planning, Placement and Sizing of Flexible AC

    Office of Scientific and Technical Information (OSTI)

    Transmission System Devices (Technical Report) | SciTech Connect Technical Report: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Citation Details In-Document Search Title: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Aiming to relieve transmission grid congestion and improve or extend feasibility domain of the operations, we build optimization heuristics, generalizing standard AC Optimal

  8. Test Plan for Solvent Extraction Data Acquisition to Support Modeling

    Office of Scientific and Technical Information (OSTI)

    Efforts (Technical Report) | SciTech Connect Technical Report: Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts Citation Details In-Document Search Title: Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts This testing will support NEAMS SafeSep Modeling efforts related to droplet simulation in liquid-liquid extraction equipment. Physical characteristic determinations will be completed for the fluids being used in the experiment

  9. Test Plan for Solvent Extraction Data Acquisition to Support Modeling

    Office of Scientific and Technical Information (OSTI)

    Efforts (Technical Report) | SciTech Connect Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts Citation Details In-Document Search Title: Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional

  10. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Broader source: Energy.gov [DOE]

    In this report, we introduce a new transparent regional capacity expansion model with high spatio-temporal resolution and detailed representation of dispatch. The development of this model, referred to as the Resource Planning Model (RPM), is motivated by the lack of a tool in the public domain that can be used to characterize optimal regional deployment of resources with detailed dispatch modeling. In particular, RPM is designed to evaluate scenarios of renewable technology deployment to meet renewable portfolio standard (RPS) and emission-reduction goals, and to project possible deployment levels for various projections of future technology and fuel prices.

  11. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  12. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  13. Standard Review Plan Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the

  14. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  15. Tribal Strategic Energy Plan and Planning Handbook | Department of Energy

    Energy Savers [EERE]

    Tribal Strategic Energy Plan and Planning Handbook Tribal Strategic Energy Plan and Planning Handbook The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a

  16. Paducah Community Relations Plan

    Broader source: Energy.gov [DOE]

    The Paducah Community Relations Plan is a primary document of the FFA that directs the comprehensive remediation of the PGDP site. The Paducah CRP describes how DOE will provide opportunities for...

  17. Project Management Plan Examples

    Broader source: Energy.gov [DOE]

    The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject...

  18. Planning for the future

    SciTech Connect (OSTI)

    Lesh, Pamela

    2009-06-15

    Four changes to integrated resource planning could significantly improve alignment between future utility spending and the forces and changes that are upending past preconceptions of how to predict future load. (author)

  19. Text of Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... "The EIR team believes the organization and management of DWPF is a model that might be ... A revised "FH Area High Level Waste Removal Plan and Schedule (WRP&S)" was submitted to ...

  20. Decommissioning Plan RM

    Office of Environmental Management (EM)

    ... 430.1B Attachment 2, section 6.c.(4)? (LTS-1.3) Does the decommissioning plan include a process to track the status of LTS actions, including gap analysis of the LTS transition ...

  1. LFRG Program Management Plan

    Broader source: Energy.gov [DOE]

    The purpose of the EM  Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

  2. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  3. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  4. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the ...

  5. MITIGATION ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft monitoring plan to be prepared and submitted to DOE 90 days after Surface Mine Control and Reclamation Act permit (if issued), or within 18 months of issuance of DOE ROD,...

  6. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Supersedes DOE G 151.1-1, Volume 2.

  7. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 3.0: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Page 3 - 1 2012 Technical Plan 3.0 Technical Plan This section of the Plan provides a detailed outline of the various activities occurring within the technical sub-programs of the Fuel Cells Technologies Program (FCT Program). The technical sub- programs of the FCT Program are as follows: 3.1 Hydrogen Production 3.2 Hydrogen Delivery 3.3 Hydrogen Storage 3.4 Fuel Cells 3.5 Manufacturing R&D 3.6 Technology Validation 3.7 Hydrogen Safety, Codes and Standards 3.8 Education and Outreach 3.9

  8. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  9. Report: Strategic Planning Impacts

    Office of Environmental Management (EM)

    Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM

  10. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 DOE ORDER 436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by Princeton University for the U.S. Department of Energy under contract DE-AC02-09CH1 PLAN APPROVAL Robert S. Sheneman Deputy Head Environment, Safety, Health & Security Department Michael Viola Head, Facilities & Site Services Division Jerry D. Levine Head, Environment, Safety, Health & Security Department William B. Davis Head, Information Technology Department, CIO Michael D. Williams

  11. Strategic Plan: 2014 - 2018

    Gasoline and Diesel Fuel Update (EIA)

    Strategic Plan: 2014 - 2018 1 July 2014 Strategic Plan: 2014 - 2018 Mission Collect, analyze, and disseminate independent and impartial energy information to promote sound policymaking, efficient markets, and public understanding of energy and its interaction with the economy and the environment. Overview The U.S. Energy Information Administration (EIA) is the statistical and analytical agency within the U.S. Department of Energy (DOE). EIA conducts a wide range of data collection, analysis,

  12. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  13. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  14. ARM - Lesson Plans: Microclimate

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Microclimate Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Lesson Plans: Microclimate Objective The objective of this activity is to identify, measure, and average microclimatic temperatures in a particular region. Materials Each student or group of students will need the following: Large

  15. ARM - Lesson Plans: Outgassing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Outgassing Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Lesson Plans: Outgassing Objective The objective is to demonstrate the concept of outgassing and to explain the origins of the earth's atmosphere. Materials Each student or group of students will need the following: Two effervescent

  16. ARM - Lesson Plans: Winds

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Winds Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Lesson Plans: Winds Objective The objective of this activity is to investigate how pressure differences create wind. Materials Each student or group of students will need the following: Balloon (long balloons or round ones) Bicycle pump

  17. Career Planning - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    banner-career-planning Career Planning for the Nuclear Industry Some people are surprised to learn just how many types of careers exist in the nuclear industry. From construction of nuclear facilities to operation, maintenance and research, many types of skills are needed in Professional, Technician, Engineer and Craft categories. To see types of nuclear industry jobs, click here. To see descriptions of nuclear industry jobs, click here. Whether you are considering a career change or just

  18. BETO Strategic Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BETO Strategic Planning Program Review Valerie Reed Deputy Director Bioenergy Technologies Office 2 | Bioenergy Technologies Office DOE Corporate Level Strategic Planning * A comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. * Four year duration * Supports the President's goal to halve our net oil imports by 2020 *

  19. Sampling and Analysis Plan

    Office of Legacy Management (LM)

    Final Groundwater Contingency Remedy Optimization Remedial Design/Remedial Action Work Plan for the Monticello Mill Tailings Site Operable Unit III, Monticello, Utah May 2014 LMS/MNT/S10629 This page intentionally left blank LMS/MNT/S10629 Final Groundwater Contingency Remedy Optimization Remedial Design/Remedial Action Work Plan for the Monticello Mill Tailings Site Operable Unit III, Monticello, Utah May 2014 This page intentionally left blank U.S. Department of Energy Groundwater Contingency

  20. Customer Service Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public

  1. Waste feed delivery environmental permits and approvals plan

    SciTech Connect (OSTI)

    Papp, I.G.

    1998-07-06

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site`s Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan.

  2. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's...

  3. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  4. Workforce Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Plans Workforce Plans Workforce Planning is an integral part of the human capital planning process. The intent of every workforce planning effort is to ensure that organizations have the resources necessary to meet mission requirements and program priorities. To achieve this intent, organizations must first identify and understand those mission requirements and program priorities; typically through Strategic Planning. These goals and objectives not only provide the basis for

  5. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  6. Strategic Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the

  7. 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan PDF icon Section 999: 2011 Annual Plan More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan Sec. 999 Annual Plan 2012 UDAC Meeting - June 2007

  8. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  9. NUGEX 2014 Meeting Planning Subcommittee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Meeting Planning Subcommittee NUGEX 2014 Meeting Planning Subcommittee Members Frank Tsung, UCLA (HEPFES) Gary Grest, Sandia (BES) Last edited: 2013-06-03 11:04:4...

  10. USDrive Partnership Plan, December 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan December 2014 December 2014 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  11. Realistic Financial Planning and Rapid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Realistic Financial Planning and Rapid Modification to Project Execution are Essential ... Ignition Facility Title: Realistic Financial Planning and Rapid Modification to ...

  12. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

  13. Construction details of an earth-sheltered passive solar thermosiphon air house

    SciTech Connect (OSTI)

    Ashelman, R.B.; Hagen, G.C.

    1980-01-01

    Construction details are presented for Sunrise, a passive solar, earth-sheltered house in eastern West Virginia. Particular attention is paid to the thermosiphon air system, as well as structural, waterproofing and insulation details.

  14. Appraisers Project Plan: Wireless Controls and Retrofit LED Lighting Demonstration

    Broader source: Energy.gov [DOE]

    Appraisers Project Plan: Wireless Controls and Retrofit LED Lighting Demonstration Measurement and Verification Report This report details the measurement and verification tools and methods used to evaluate the effectiveness of wireless lighting controls and LED lighting at the Appraisers Building, a federal office building in San Francisco, CA.

  15. Detailed Monthly and Annual LNG Import Statistics (2004-2012) | Department

    Energy Savers [EERE]

    of Energy Detailed Monthly and Annual LNG Import Statistics (2004-2012) Detailed Monthly and Annual LNG Import Statistics (2004-2012) Detailed Monthly and Annual LNG Import Statistics (2004-2012) PDF icon Detailed Monthly and Annual LNG Import Statistics (2004-2012) More Documents & Publications U.S. LNG Imports and Exports (2004-2012) Natural Gas Imports and Exports Fourth Quarter Report 2013 LNG Safety Research Report to Congress

  16. Sec. Chu Announces More 'SunShot' Details | Department of Energy

    Energy Savers [EERE]

    Sec. Chu Announces More 'SunShot' Details Sec. Chu Announces More 'SunShot' Details February 4, 2011 - 1:30pm Addthis Sec. Chu Announces More 'SunShot' Details. | Department of Energy Photo | Courtesy of National Renewable Energy Laboratory | Public Domain | Sec. Chu Announces More 'SunShot' Details. | Department of Energy Photo | Courtesy of National Renewable Energy Laboratory | Public Domain | Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs What

  17. 2008_Transition_Program_Details_Book_Three.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08_Transition_Program_Details_Book_Three.pdf 2008_Transition_Program_Details_Book_Three.pdf PDF icon 2008_Transition_Program_Details_Book_Three.pdf More Documents & Publications DOE Transition Documents - 2008 Presentation: DOE Nuclear Nonproliferation Report of the Task Force on Nuclear Nonproliferation

  18. Strategic Energy Planning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Resources Strategic Energy Planning Resources Below are resources for Tribes on strategic energy planning. Learn more about strategic energy planning. ...

  19. CESP Planning Timeline Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CESP Planning Timeline Template Tool 0.1: CESP Planning Timeline Template in the Guide to Community Energy Strategic Planning. File CESP Planning Timeline Template More Documents & ...

  20. 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2009 Annual Plan PDF icon Section 999: 2009 Annual Plan More Documents & Publications 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other...

  1. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  2. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  3. Institutional plan FY 1998--FY 2003

    SciTech Connect (OSTI)

    1997-10-01

    The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

  4. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  5. Creating Sample Plans

    Energy Science and Technology Software Center (OSTI)

    1999-03-24

    The program has been designed to increase the accuracy and reduce the preparation time for completing sampling plans. It consists of our files 1. Analyte/Combination (AnalCombo) A list of analytes and combinations of analytes that can be requested of the onsite and offsite labs. Whenever a specific combination of analytes or suite names appear on the same line as the code number, this indicates that one sample can be placed in one bottle to bemore » analyzed for these paremeters. A code number is assigned for each analyte and combination of analytes. 2. Sampling Plans Database (SPDb) A database that contains all of the analytes and combinations of analytes along with the basic information required for preparing a sample plan. That basic information includes the following fields; matrix, hold time, preservation, sample volume, container size, if the bottle caps are taped, acceptable choices. 3. Sampling plans create (SPcreate) a file that will lookup information from the Sampling Plans Database and the Job Log File (JLF98) A major database used by Sample Managemnet Services for recording more than 100 fields of information.« less

  6. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  7. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  8. Storm Water Pollution Prevention Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pollution Control Specialist FMS - Sustainability and Environmental Programs Date ......... 47 8.6 Site Sustainability Plan ......

  9. Mescalero Apache Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    Example of a tribal community strategic energy plan developed by the Mescalero Apache. Source: Kabotie Consulting.

  10. 6-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 9, 2011 Page 1 of 1 RIVER & PLATEAU COMMITTEE - 6 MONTH WORK PLAN January * River Corridor Cleanup, using 100 K as an Example * Draft A, 100 K Proposed Plan * PW-1,3,6/CW-5 ROD: Draft letter February * TPA Milestone Delays for Central Plateau - 30 month delay on interim milestones driven by funding. Information session. * TRU Burial Grounds in 200 W (PU Waste Excavated from Z9 in 1973) * Barriers discussion (follow up from workshop) * 300 Area RI/FS (document due in December) *

  11. PRC Contract Management Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MISSION SUPPORT CONTRACT Contract No. DE-AC06-09RL14728 CONTRACT MANAGEMENT PLAN Mission Support Alliance, LLC U.S. Department of Energy RICHLAND OPERATIONS OFFICE Approved September 8, 2014 Mission Support Contract DE-AC06-09RL14728 Concurrences: Karen L. Flynn RICHLAND OPERATIONS OFFICE CONTRACT MANAGEMENT PLAN MISSION SUPPORT CONTRACT Contract No. DE-AC06-09RLI4728 July2014 Assistant Manager for Mission Support Richland Operat'ons Office, (509) 3 76-7323 "'" " "'<Y Q

  12. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  13. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  14. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  15. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Your Visit Plan your visit to the museum Experience 40 interactive exhibits revealing nuclear defense history and the research in life sciences, material sciences, space, supercomputing, energy and the environment. August 18, 2014 Visitor in an interactive exhibit Contact Us thumbnail of Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Bradbury Science Museum Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Open every day except Thanksgiving, Christmas, and New Year's (505) 667-4444 Email Great museum.

  16. DRAFT Bear Safety Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at

  17. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  18. High Risk Plan

    Office of Environmental Management (EM)

    Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are

  19. DOE CONTRACTOR PENSION PLANS

    Office of Environmental Management (EM)

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  20. TH-A-9A-06: Inverse Planning of Gamma Knife Radiosurgery Using Natural

    Office of Scientific and Technical Information (OSTI)

    Physical Models (Journal Article) | SciTech Connect TH-A-9A-06: Inverse Planning of Gamma Knife Radiosurgery Using Natural Physical Models Citation Details In-Document Search Title: TH-A-9A-06: Inverse Planning of Gamma Knife Radiosurgery Using Natural Physical Models Purpose: Treatment-planning systems rely on computer intensive optimization algorithms in order to provide radiation dose localization. We are investigating a new optimization paradigm based on natural physical modeling and

  1. Planning cogeneration systems

    SciTech Connect (OSTI)

    Limaye, D.

    1984-01-01

    Major factors and considerations in the planning and evaluation of cogeneration systems are explained here. Coverage is provided of prefeasibility assessment, technical and economic feasibility evaluation, computerized systems design, cogeneration technologies and applications, and non-conventional technologies. Also discussed are fuel availability and price trends, financing and risk management in cogeneration projects, and practical considerations in cogeneration implementation.

  2. Designing a Benchmarking Plan

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Solution Center document about how state and local governments, Indian tribes, and overseas U.S. territories can design a plan to benchmark the energy consumption in public buildings.

  3. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  4. PNNL Campus Master Plan

    SciTech Connect (OSTI)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  5. Comprehensive facilities plan

    SciTech Connect (OSTI)

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  6. Plans are nothing ... Planning is everything | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plans are nothing ... Planning is everything May 12, 2009 It was Dwight D. Eisenhower who said, "Plans are nothing; planning is everything." I believe that the way he meant it to be understood implied that whatever you plan, you will be obliged to deviate from in response to circumstances "on the ground." Nevertheless, the very fact that you have taken the care to develop, discuss and put in place a plan will serve you extremely well, no matter how much deviation you are

  7. Community Energy Strategic Planning- Step 9

    Broader source: Energy.gov [DOE]

    This presentation provides Step 9 to the Community Energy Strategic Planning approach, Plan to Elevate.

  8. CITSS Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CITSS Project Plan CITSS Project Plan The Customer Information Technology Support System (CITSS) Training Plan, from an actual DOE Commercial Off-The-Shelf (COTS) software integration project, can be used as a template to facilitate the creation of the training plan for your particular project. PDF icon CITSS Project Plan More Documents & Publications CITSS Project Plan Software Configuration Management Plan Training Plan

  9. EV Everywhere Challenge Kick-Off

    Broader source: Energy.gov (indexed) [DOE]

    technical targets for these vehicles. BEV100 BEV300 Levelized Cost of Driving (LCD) vehicle purchase price + fuel expenditure over 5 years, expressed per mile traveled...

  10. EV Everywhere Grand Challenge Kick-Off

    Broader source: Energy.gov (indexed) [DOE]

    BREAKOUT GROUPS 2:40-3:00 PM BREAK 3:00-4:30 PM BREAKOUT SESSION 2: (5 groups) - Batteries - Drivetrain (Power Electronics and Motors) - Charging InfrastructureFast Charge...

  11. ALS@20 Kick-Off Celebration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tribulations encountered during the construction of the ALS from former Director Jay Marx, current ALS Scientific Director Steve Kevan and Director Roger Falcone talked about...

  12. Huizenga Kicks Off Waste Management Conference

    Broader source: Energy.gov [DOE]

    PHOENIX EM Senior Advisor Dave Huizenga shared many accomplishments of the nuclear cleanup program in a speech at the annual Waste Management Conference today, including recent news of its progress on the U.S. Government Accountability Offices (GAO) High-Risk List.

  13. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  14. National Ignition Facility Configuration Management Plan

    SciTech Connect (OSTI)

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and approved changes are implemented according to the change requirements documents.

  15. Involuntary Separation Plan Template | Department of Energy

    Energy Savers [EERE]

    Plan Template Involuntary Separation Plan Template PDF icon Attachment 6 - Involuntary Separation Plan Template_Rev1 More Documents & Publications Workforce Restructuring Policy General Workforce Restructuring Plan Template Self-Select Voluntary Separation Plan Template

  16. Molecular details of a starch utilization pathway in the human gut symbiont

    Office of Scientific and Technical Information (OSTI)

    Eubacterium rectale (Journal Article) | SciTech Connect Molecular details of a starch utilization pathway in the human gut symbiont Eubacterium rectale Citation Details In-Document Search Title: Molecular details of a starch utilization pathway in the human gut symbiont Eubacterium rectale Authors: Cockburn, Darrell W. ; Orlovsky, Nicole I. ; Foley, Matthew H. ; Kwiatkowski, Kurt J. ; Bahr, Constance M. ; Maynard, Mallory ; Demeler, Borries ; Koropatkin, Nicole M. [1] ; UTSMC) [2] + Show

  17. Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated

    Office of Scientific and Technical Information (OSTI)

    Reactants Inertial Confinement Fusion Experiments (Conference) | SciTech Connect Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated Reactants Inertial Confinement Fusion Experiments Citation Details In-Document Search Title: Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated Reactants Inertial Confinement Fusion Experiments Authors: Haines, Brian Michael [1] ; Grim, Gary P. [1] ; Fincke, James R. [1] ; Shah, Rahul C. [1] ; Forrest, Chad [2] ;

  18. Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated

    Office of Scientific and Technical Information (OSTI)

    Reactants Inertial Confinement Fusion Experiments (Conference) | SciTech Connect Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated Reactants Inertial Confinement Fusion Experiments Citation Details In-Document Search Title: Detailed High-Resolution Three-Dimensional Simulations of OMEGA Separated Reactants Inertial Confinement Fusion Experiments × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's

  19. Microsoft Word - Appendix I - Additional Field Implementation Detail for Selected Monitoring.docx

    Office of Legacy Management (LM)

    I Additional Field Implementation Detail for Selected Monitoring Objectives This page intentionally left blank LMS/RFS/S08202-1.0 Rocky Flats Site, Colorado Additional Field Implementation Detail for Selected Monitoring Objectives July 2013 This page intentionally left blank U.S. Department of Energy Additional Field Implementation Detail for Selected Monitoring Objectives July 2013 Doc. No. S08202-1.0 Page i Contents Abbreviations

  20. Guidance for Filling Out a Detailed H2A Production Case Study | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Guidance for Filling Out a Detailed H2A Production Case Study Guidance for Filling Out a Detailed H2A Production Case Study Download presentation slides from the EERE Fuel Cell Technologies Office webinar, "Guidance for Filling Out a Detailed H2A Production Case Study," held July 9, 2013. PDF icon Guidance for Filling Out a Detailed H2A Production Case Study Webinar Slides More Documents & Publications Summary of Electrolytic Hydrogen Production: Milestone Completion

  1. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational

  2. NSAR Ten Year Renewable Energy Plan - Integration Planning

    Office of Environmental Management (EM)

    OFFICE OF INDIAN ENERGY NSAR Ten Year Renewable Energy Plan - Integration Planning September 2015 1 Overview * Process * 3Ps * 3Cs 2 National Strategy for the Arctic Region (NSAR) - Federal Engagement * Step One - See Russia from your House * The Ten Year Renewable Energy Plan - captures existing energy planning and development activities within the context of renewable energy and energy efficiency - identifies gaps or areas appropriate for federal agency engagement as stated in: * Executive

  3. Peru-Planning for Climate Change (PlanCC) | Open Energy Information

    Open Energy Info (EERE)

    Peru-Planning for Climate Change (PlanCC) (Redirected from Planning for Climate Change (PlanCC) Peru) Jump to: navigation, search Logo: Planning for Climate Change (PlanCC) Peru...

  4. Planned Start July 18

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    l Because the holder color is black, the dosimeter can reach temperatures in excess of 150 F when placed in direct sunlight in an unventilated area, such as the dashboard of a car. Error can be as high as 60 percent for storage at 150 degrees fahrenheit for 100 days. DOE to raise speed limit from 55 mph to 60 mph between Wye Barricade and Horn Rapids Road on a pilot basis. Planned start date is July 18 Planned Start July 18 00 I S S U E MSA Update M i s s i o n S u p p o r t C o n t r a c t 00 I

  5. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  6. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  7. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  8. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  9. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  10. 2004 Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Legacy Management STRATEGIC PLAN "Managing Today's Change, Protecting Tomorrow's Future" July 2004 ii July 2004 Executive Summary Activities of the U.S. Department of Energy (the Department) and predecessor agencies, particularly during the Cold War, have left a legacy of environmental impact at over 100 sites. Workers associated with these historical and current activities number in the hundreds of thousands. Addressing this environmental and human

  11. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 | Energy Efficiency and Renewable Energy eere.energy.gov ACI Detroit Quality Work Plan Update April 2014 QWP: Background Culmination of a multi-year investment aimed at demonstrating quality and accountability in the WAP Taking action on lessons learned through various quality assurance reviews Establishing WAP as a national leader in technical resources and quality assurance Improving long term sustainability by building the foundation of the national industry with WAP at the core 2

  12. TEPP Planning Brochure

    Office of Environmental Management (EM)

    Following the completion of the assessment process and the remedying of any identified improvement areas, a training tabletop drill or an exercise involving applicable emergency response organizations should be conducted. The drill or exercise will help to evaluate current emergency responder readiness. GUIDANCE FOR PLANNING, CONDUCTING AND EVALUATING TRANSPORTATION EXERCISES: This guide assists local, state, tribal and federal agencies in conducting tabletops, drills and exercises for

  13. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented

  14. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field

  15. Regional Energy Planning

    Energy Savers [EERE]

    Regional Energy Planning Alaska Native Village Energy Development Workshop April 29, 2014 Affordable and Stable Energy for Alaskans  Maintain consistency with State energy policy and goals  Provide vetting process to incorporate renewables, fossil fuels  Provide statewide perspective while balancing Railbelt infrastructure development  Engage communities in providing sustainable energy futures 2 Energy Sources Vary 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Wind Hydroelectric

  16. National Infrastructure Protection Plan

    Office of Environmental Management (EM)

    Infrastructure Protection Plan 2006 Preface Preface i The ability to protect the critical infrastructure and key resources (CI/KR) of the United States is vital to our national security, public health and safety, economic vitality, and way of life. U.S. policy focuses on the importance of enhancing CI/KR protection to ensure that essential governmental missions, public services, and economic functions are maintained in the event of a terrorist attack, natural disaster, or other type of

  17. WATER CONSERVATION PLAN

    National Nuclear Security Administration (NNSA)

    i WATER CONSERVATION PLAN TONOPAH TEST RANGE UNITED STATES DEPARTMENT OF ENERGY January 10, 2011 Prepared for: Tonopah Test Range Post Office Box 871 Tonopah, Nevada 89049 (702) 295-8109 Prepared by: Sandia National Laboratories / New Mexico Post Office Box 5800 Albuquerque, New Mexico 87185-0729 (505) 284-1831 On behalf of: Sandia Site Office Post Office Box 5400 Albuquerque, New Mexico 87185-0184 (505) 845-6036 ii TABLE OF CONTENTS 1.0 INTRODUCTION

  18. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  19. Future land use plan

    SciTech Connect (OSTI)

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  20. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental

  1. Oak Ridge reservation land-use plan

    SciTech Connect (OSTI)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  2. Strategic Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is divided into two main phases. In the scientific plan phase we developed a new vision for our scientific and technology research. Plans for focus areas have been developed...

  3. OpenEI Community - planning

    Open Energy Info (EERE)

    coming soon

    http:en.openei.orgcommunityblogdetailed-planning-kickscomments planning Linked Open Data Workshop in Washington, D.C. Thu, 27 Sep 2012 13:53:37 +0000 Jweers...

  4. Preferred Provider Organization (PPO) Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preferred Provider Organization (PPO) Plan for non-Medicare retirees is a medical insurance plan with a lower deductible but higher premium than the 2016 High-Deductible Health...

  5. Sodium-Bearing Waste Treatment, Applied Technology Plan

    SciTech Connect (OSTI)

    Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

    2003-06-01

    Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology.

  6. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect (OSTI)

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  7. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The preferred option is to use equipment provided by a commercial vendor during the first few years of retrieval and venting. This is based on a number of reasons. First, retrieval funding is uncertain. Using a commercial vendor will allow DOE-RL to avoid the investment and maintenance costs if retrieval is not funded. Second, when funding can be identified, retrieval will likely be performed with minimal initial throughput and intermittent operations. Again, costs can be saved by using contracted vendor services only as needed, rather than supporting Hanford equipment full time. When full-scale retrieval begins and the number of drums requiring venting increases significantly, then use of the Hanford container venting system (CVS) should be considered.

  8. System Plan Revision 5 + 6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Revision 7 General Overview DaBrisha Smith (DOE/ORP) April 10, 2013 System Plan 101 * What is System Planning - A process used by organizations to design, analyze and define future operations possible outcomes. * What is the RRP System Plan - A summary-level document that describes how the technical, cost, and schedule operating scenario (Baseline Case) is integrated to meet the mission demands. - Describes how the RPP mission could be achieved based on a set of assumptions for each

  9. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accidental Death & Dismemberment Plan Accidental Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Accidental Death & Dismemberment Plan Accidental Death and Dismemberment (AD&D) insurance protects you and your family from the unforeseen financial hardship of an accident that causes death, dismemberment, paralysis, or loss of

  10. Quality Work Plan Training Requirement

    Broader source: Energy.gov [DOE]

    Weatherization Assistance Program's comprehensive Quality Work Plan requirements and resources to meet this obligation in the field.

  11. BETO Releases 2016 Update of Multi-Year Program Plan

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s (DOE’s) Bioenergy Technologies Office (BETO) is pleased to announce the 2016 update of the BETO Multi-Year Program Plan (MYPP). The MYPP serves as an operational guide to help BETO manage and coordinate its activities as well as a vehicle to communicate BETO’s mission, goals, and plans to stakeholders and the public. It details BETO’s research, development, demonstration, market transformation, and crosscutting activities for the coming years and outlines how they are important to meeting the nation’s energy and sustainability challenges.

  12. Clean Energy Business Plan Competition

    ScienceCinema (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2013-05-29

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  13. Clean Energy Business Plan Competition

    SciTech Connect (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv

    2012-01-01

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  14. ESPC ENABLE ACQUISITION PLAN TEMPLATE

    Broader source: Energy.gov [DOE]

    Template serves as a tool to help agencies develop an acquisition plan. The acquisition plan is the first formal step in the Energy Savings Performance Contract (ESPC) ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process.

  15. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  16. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  17. Integrated rural energy planning

    SciTech Connect (OSTI)

    El Mahgary, Y.; Biswas, A.K.

    1985-01-01

    This book presents papers on integrated community energy systems in developing countries. Topics considered include an integrated rural energy system in Sri Lanka, rural energy systems in Indonesia, integrated rural food-energy systems and technology diffusion in India, bringing energy to the rural sector in the Philippines, the development of a new energy village in China, the Niaga Wolof experimental rural energy center, designing a model rural energy system for Nigeria, the Basaisa village integrated field project, a rural energy project in Tanzania, rural energy development in Columbia, and guidelines for the planning, development and operation of integrated rural energy projects.

  18. 2007 Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Legacy Management Office of Legacy Management Strategic Plan O r g a n i z a t i o n O r g a n i z a t i o n A H i g h Perfo r m i n g A H i g h Perfo r m i n g HPO Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1458 Cover, left to right, top to bottom: The Environmental Justice program affords learning opportunities for interns at an U.S. Department of Energy national laboratory. A records

  19. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in

  20. Regional Energy Planning

    Energy Savers [EERE]

    Regional Energy Planning Photo by: Cassandra Cerny, GVEA Jed Drolet, Energy Information Analyst BIA Providers Conference December 3, 2015 Alaska Energy Authority: Mission "To Reduce the Cost of Energy in Alaska"  AEA is an independent and public corporation of the State of Alaska  Created by the Alaska Legislature in 1976  44.83.070: " The purpose of the Authority is to promote, develop, and advance the general prosperity and economic welfare of the people of the state by

  1. Proj. Plan Example SEM

    Energy Savers [EERE]

    (DOE) CUSTOMER INFORMATION TECHNOLOGY (IT) SUPPORT SYSTEM (CITSS) Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart

  2. Community Relations Plan Update

    Office of Legacy Management (LM)

    8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this

  3. Final work plan : groundwater monitoring at Morrill, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  4. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  5. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

  6. Marketing and Communications Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Plan Marketing and Communications Plan This is a document from Energy ... PDF icon Marketing and Communications Plan More Documents & Publications Sonoma County ...

  7. NERSC Strategic Plan Is Now Online

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    input for ASCR's long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. More...

  8. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  9. Page 6, The Thrift Savings Plan (TSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan (TSP) The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees. The best way to assure that your retirement income meets...

  10. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  11. WIPP - Passive Institutional Controls (PICs) Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing...

  12. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for...

  13. Commercialization Plan Worksheet | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commercialization Plan Worksheet A Microsoft Word template for potential licensees to use in preparing a proposed commercialization plan for an Argonne technology File commercialization_plan_worksheet.docx

  14. ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY, EMERGENCY PLANNING...

    Energy Savers [EERE]

    18: SECURITY, EMERGENCY PLANNING, AND SAFETY RECORDS More Documents & Publications ADM 18 PDF Security, Emergency Planning & Safety Records Security, Emergency Planning &...

  15. Plans and Reports | Department of Energy

    Office of Environmental Management (EM)

    Plans and Reports Plans and Reports The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) tracks, plans, and reports progress on sustainability metrics set by...

  16. 2016 Site Sustainability Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Site Sustainability Plan 2016 Site Sustainability Plan The purpose of this Site ... PDF icon 2016 Site Sustainability Plan, U.S. Department of Energy Office of Legacy ...

  17. Recommendations: 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Annual Plan Recommendations: 2009 Annual Plan PDF icon URTAC - Recommendations on 2009 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2009 Section...

  18. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  19. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  20. A brief overview of some historical details of Oak Ridge, part...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    soon as World War II ended, the Cold War began. The Soviet Union had the plans for Fat Man given to them by Klaus Fuchs before the bomb was even used. By August 29, 1949, the...