Powered by Deep Web Technologies
Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Detailed Planning Kicks Off | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6 No revision has beenFinancialSilver

2

Test Series 2. 3 detailed test plan  

SciTech Connect (OSTI)

Test Series 2.3 is chronologically the second of the five sub-series of tests which comprise Test Series 2, the second major Test Series as part of the combustion research phase to be carried out at the Grimethorpe Experimental Pressurised Fluidised Bed Combustion Facility. Test Series 2.3 will consist of 700 data gathering hours which is expected to require some 1035 coal burning hours. The tests will be performed using US supplied coal and dolomite. This will be the first major series of tests on the Facility with other than the UK datum coal and dolomite. The document summarises the background to the facility and the experimental program. Described are modifications which have been made to the facility following Test Series 2.1 and a series of Screening Tests. Detailed test objectives are specified as are the test conditions for the experiments which comprise the test series. The test results will provide information on the effects of the bed temperature, excess air level, Ca/S ratio, number of coal feed lines, and combustion efficiency and sulphur retention. A significant aspect of the test series will be part load tests which will investigate the performance of the facility under conditions of turn down which simulate load following concepts specified for two combined cycle concepts, i.e., their CFCC combined cycle and a turbo charged combined cycle. The material test plan is also presented. The principal feature of the materials programme is the planned exposure of a set of static turbine blade specimens in a cascade test loop to the high temperature, high pressure flue gas. A schedule for the programme is presented as are contingency plans.

Not Available

1983-12-01T23:59:59.000Z

3

Detailed Execution Planning for Large Oil and Gas Construction Projects  

E-Print Network [OSTI]

Detailed Execution Planning for Large Oil and Gas Construction Projects Presented by James Lozon, University of Calgary There is currently 55.8 billion dollars worth of large oil and gas construction projects scheduled or underway in the province of Alberta. Recently, large capital oil and gas projects

Calgary, University of

4

River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1  

SciTech Connect (OSTI)

This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

Project Integration

2005-09-26T23:59:59.000Z

5

Gas Kick Mechanistic Model  

E-Print Network [OSTI]

-gain and temperature profile in the annulus. This research focuses on these changes in these parameters to be able to detect the occurrence of gas kick and the circulation of the gas kick out from the well. In this thesis, we have developed a model that incorporates...

Zubairy, Raheel

2014-04-18T23:59:59.000Z

6

Chaos in Kicked Ratchets  

E-Print Network [OSTI]

We present a minimal one-dimensional deterministic continuous dynamical system that exhibits chaotic behavior and complex transport properties. Our model is an overdamped rocking ratchet that is periodically kicked with a delta function potential. We develop an analytical approach that predicts many key features of the system, such as current reversals, as well as the presence of chaotic behavior and bifurcation. We show that our approach can be easily extended to other types of periodic forces, including the square wave.

Daniel G. Zarlenga; Hilda A. Larrondo; Miguel Arizmendi; Fereydoon Family

2014-07-29T23:59:59.000Z

7

Kick-Off Meeting for New Fuel Cell Projects  

E-Print Network [OSTI]

Requirements · Hydrogen Safety Plan ­ due 90 days after award signed by Contracting Officer · Annual ProgressKick-Off Meeting for New Fuel Cell Projects David Peterson U.S. Department of Energy Golden Field management in support of EERE HQ Programs · Responsible for managing cost/schedule/technical progress

8

Kicking the Tires | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJeffersonJonathan PershingrelocatesKaye D.KentheKicking the Tires

9

Dynamical Localization in Kicked Quantum Rotors  

E-Print Network [OSTI]

The periodically $\\delta$-kicked quantum linear rotor is known to experience non-classical bounded energy growth due to quantum dynamical localization in angular momentum space. We study the effect of random deviations of the kick period in simulations and experiments. This breaks the energy and angular momentum localization and increases the rotational alignment, which is the analog of the onset of Anderson localization in 1-D chains.

Kamalov, Andrei; Bucksbaum, Philip H

2015-01-01T23:59:59.000Z

10

Catalysis Working Group Kick-Off Meeting Agenda | Department...  

Energy Savers [EERE]

Kick-Off Meeting Agenda Agenda for the kick-off meeting of the U.S. Department of Energy Fuel Cell Technologies Program's Catalysis Working Group, held May 14, 2012, in Arlington,...

11

Accelerator dynamics of a fractional kicked rotor  

E-Print Network [OSTI]

It is shown that the Weyl fractional derivative can quantize an open system. A fractional kicked rotor is studied in the framework of the fractional Schrodinger equation. The system is described by the non-Hermitian Hamiltonian by virtue of the Weyl fractional derivative. Violation of space symmetry leads to acceleration of the orbital momentum. Quantum localization saturates this acceleration, such that the average value of the orbital momentum can be a direct current and the system behaves like a ratchet. The classical counterpart is a nonlinear kicked rotor with absorbing boundary conditions.

A. Iomin

2006-09-14T23:59:59.000Z

12

Supernovae, Landau Levels, and Pulsar Kicks  

E-Print Network [OSTI]

We derive the energy asymmetry given the proto-neutronstar during the time when the neutrino sphere is near the surface of the proto-neutron star, using the modified URCA process. The electrons produced with the anti-neutrinos are in Landau levels due to the strong magnetic field, and this leads to asymmetry in the neutrino momentum, and a pulsar kick. Our main prediction is that the large pulsar kicks start at about 10 s and last for about 10 s, with the corresponding neutrinos correlated in the direction of the magnetic field.

Leonard S. Kisslinger

2006-12-18T23:59:59.000Z

13

Department of Energy Kicks Off the State of Environmental Justice...  

Office of Environmental Management (EM)

Protection Agency, the National Small Town Alliance, the Howard University School of Law and others, kicked off the State of Environmental Justice in America 2011...

14

Navarro Kicks Off New Environmental Programs Services Contract...  

Energy Savers [EERE]

kicked off a new environmental programs services contract with Navarro Research and Engineering. Under the purview of the Environmental Management Program at the DOE National...

15

Energy Secretary Bodman Kicks Off "Energizing America for Energy...  

Energy Savers [EERE]

"Energizing America for Energy Security" Tour with Visit to Habitat for Humanity "Net-Zero Energy Home" Energy Secretary Bodman Kicks Off "Energizing America for Energy Security"...

16

First Steps: Initial Planning Details Client point of contact schedules a meeting with the event planner (if applicable).  

E-Print Network [OSTI]

: § Meeting history (if applicable) ­ if the meeting has occurred before, obtain the details of what was done to the client point of contact to enter into event approval database. · Client point of contact develops agenda into the event approval database. · Client point of contact enters event into event approval database and uploads

17

Eigensolutions of the kicked Harper model  

E-Print Network [OSTI]

The time-evolution operator for the kicked Harper model is reduced to block matrix form when the effective Planck's constant hbar = 2 pi M/N and M and N are integers. Each block matrix is spanned by an orthonormal set of N "kq" (quasi-position/quasi-momentum) functions. This implies that the system's eigenfunctions or stationary states are necessarily discrete and periodic. The reduction allows, for the first time, an examination of the 2-dimensional structure of the system's quasi-energy spectrum and the study of, with unprecedented accuracy, the system's stationary states.

G. A. Kells

2006-07-14T23:59:59.000Z

18

Science on Saturday lecture series kicks off with tribute to...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science on Saturday lecture series kicks off with tribute to PPPL engineer and SOS host By Jeanne Jackson DeVoe January 21, 2015 Tweet Widget Google Plus One Share on Facebook...

19

Subsea Kick Detection on Floating Vessels: A Parametric Study  

E-Print Network [OSTI]

Well control in drilling operations is priority to personnel safety. Detection of kicks, or the unscheduled entry of formation fluids into the wellbore, is vital to well control. It has been determined that return flow rate is the parameter most...

Collette, Eric Peter

2013-07-22T23:59:59.000Z

20

DOE's 2015 Tribal Renewable Energy Webinar Series to Kick Off...  

Energy Savers [EERE]

energy security, improved climate change adaptation and resiliency, and more stable energy costs. This year's series will kick off on Jan. 28, 2015, from 11 a.m. to 12:30...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Final Detailed Measurement Program Plan Detailed Measurement Program Plan  

E-Print Network [OSTI]

by TrueWind Solutions, LLC Albany, New York for California Energy Commission Sacramento, California was developed by TrueWind Solutions, hereon referred to as TrueWind, to guide Task 4 of the Wind Energy Resource Modeling and Measurement Project, contact number 500-03-006, with the California Energy Commission

22

Evaluation of potential kick scenarios in riserless drilling  

E-Print Network [OSTI]

when drilling conventionally is somewhat different from the procedures when drilling riserless. The two most common methods of kick killing utilized in conventional drilling, are the "Driller's Method" and the "Wait and Weight Method" (also referred... to as the "Engineers Method" )' . The basic procedure utilized by the Driller's Method is to shut in the well, measure stabilized shut-in drillpipe pressure (SIDPP), shut-in casing pressure (SICP), and pit gain. Circulate the kick up the annulus and out...

Seland, Stig

1999-01-01T23:59:59.000Z

23

Kick circulation analysis for extended reach and horizontal wells  

E-Print Network [OSTI]

KICK CIRCULATION ANALYSIS FOR EXTENDED-REACH AND HORIZONTAL WELLS A Thesis by MAXIMILIAN M. LONG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE December 2004 Major Subject: Petroleum Engineering KICK CIRCULATION ANALYSIS FOR EXTENDED-REACH AND HORIZONTAL WELLS A Thesis by MAXIMILIAN M. LONG Submitted...

Long, Maximilian Mark

2005-02-17T23:59:59.000Z

24

Fractional Equations of Kicked Systems and Discrete Maps  

E-Print Network [OSTI]

Starting from kicked equations of motion with derivatives of non-integer orders, we obtain "fractional" discrete maps. These maps are generalizations of well-known universal, standard, dissipative, kicked damped rotator maps. The main property of the suggested fractional maps is a long-term memory. The memory effects in the fractional discrete maps mean that their present state evolution depends on all past states with special forms of weights. These forms are represented by combinations of power-law functions.

Vasily E. Tarasov; George M. Zaslavsky

2011-07-20T23:59:59.000Z

25

OUTLINE OF DETAILED TEST PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Initial Development of Nuclear Concrete Materials Database for Light Water Reactor Sustainability Program September 30, 2010 Prepared by Weiju Ren and Dan Naus Oak Ridge National...

26

National Clean Energy Business Plan Competition Kicks Off With...  

Broader source: Energy.gov (indexed) [DOE]

to Inspire Collegiate Clean Energy Entrepreneurs Superior Ecotech's technology uses algae to convert carbon dioxide resulting from brewing beer into omega-3 oils, which lowers...

27

National Clean Energy Business Plan Competition Kicks Off With Cleantech  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2 to:DieselEnergy Auditor U.S. Department 6 3

28

Kick-Start Loans: Money Matters Workshop Financing Your Business Better  

E-Print Network [OSTI]

Kick-Start Loans: Money Matters Workshop Financing Your Business Better Summer 2014 Workshop Application Kick-Start Loans: Money Matters Workshop is a special program for M/W/DBE Construction Contractors

Kim, Philip

29

Delayed pulsar kicks from the emission of sterile neutrinos  

SciTech Connect (OSTI)

The observed velocities of pulsars suggest the possibility that sterile neutrinos with mass of several keV are emitted from a cooling neutron star. The same sterile neutrinos could constitute all or part of cosmological dark matter. The neutrino-driven kicks can exhibit delays depending on the mass and the mixing angle, which can be compared with the pulsar data. We discuss the allowed ranges of sterile neutrino parameters, consistent with the latest cosmological and x-ray bounds, which can explain the pulsar kicks for different delay times.

Kusenko, Alexander; Mandal, Bhabani Prasad; Mukherjee, Alok [Department of Physics and Astronomy, University of California, Los Angeles, CA 90095-1547 (United States); Department of Physics, Banaras Hindu University, Varanasi-221005 (India)

2008-06-15T23:59:59.000Z

30

Web-assisted tunneling in the kicked harmonic oscillator  

E-Print Network [OSTI]

We show that heating of harmonically trapped ions by periodic delta kicks is dramatically enhanced at isolated values of the Lamb-Dicke parameter. At these values, quasienergy eigenstates localized on island structures undergo avoided crossings with extended web-states.

Andr R. R. Carvalho; Andreas Buchleitner

2004-09-20T23:59:59.000Z

31

Effective time-independent analysis for quantum kicked systems  

E-Print Network [OSTI]

We present a mapping of potentially chaotic time-dependent quantum kicked systems to an equivalent effective time-independent scenario, whereby the system is rendered integrable. The time-evolution is factorized into an initial kick, followed by an evolution dictated by a time-independent Hamiltonian and a final kick. This method is applied to the kicked top model. The effective time-independent Hamiltonian thus obtained, does not suffer from spurious divergences encountered if the traditional Baker-Cambell-Hausdorff treatment is used. The quasienergy spectrum of the Floquet operator is found to be in excellent agreement with the energy levels of the effective Hamiltonian for a wide range of system parameters. The density of states for the effective system exhibits sharp peak-like features, pointing towards quantum criticality. The dynamics in the classical limit of the integrable effective Hamiltonian shows remarkable agreement with the non-integrable map corresponding to the actual time-dependent system in the non-chaotic regime. This suggests that the effective Hamiltonian serves as a substitute for the actual system in the non-chaotic regime at both the quantum and classical level.

Jayendra N. Bandyopadhyay; Tapomoy Guha Sarkar

2014-09-04T23:59:59.000Z

32

Accelerator modes and their effect in the diffusion properties in the kicked rotator  

E-Print Network [OSTI]

We highlight a few recent results on the effect of the diffusion process in deterministic area preserving maps with noncompact phase space, namely the standard map. In more detail, we focus on the anomalous diffusion arising due to the accelerator modes, i.e. resonant-like features of the phase space which are transported in a super-diffusive (ballistic) manner. Their presence affects also the trajectories lying in the immediate neighborhood resulting in anomalous (non-Gaussian) diffusion. We aim to shed some light on these special properties of the phase space by utilizing the diffusion exponent (rate of diffusion) and the momentum distribution in terms of the L\\'evy stable distributions, with the goal to reach an understanding of the global behaviour. To this end we consider a rather large interval for the kick parameter ($0\\le K \\le 70$) of the standard map where accelerator modes of different periodicity exist.

T. Manos; M. Robnik

2015-01-08T23:59:59.000Z

33

A gas kick model for the personal computer  

E-Print Network [OSTI]

differential between a formation and the wellbore that allows gas to flow into the well. This differential, or underbalance, can occur during various drilling or workover activities. This model concentrates on the occurrence of kicks while drilling a well... for their interest and suggestions, and for serving on the author's committee. The individuals at Chevron Services Company's Drilling Technology Center in Houston, Texas, for generously providing information from their Simtran and Digitran simulators. Dr...

Miller, Clayton Lowell

1987-01-01T23:59:59.000Z

34

Natelson Lab abbreviated safety procedures For full, detailed discussion of lab safety, see Natelson Lab Safety Manual and Chemical Hygiene Plan.  

E-Print Network [OSTI]

Natelson Lab Safety Manual and Chemical Hygiene Plan. An additional resource is "Prudent Practices/spill/inhalation injury, Memorial Hermann is the best facility in the area that can manage these injuries, and REMS in the Laboratory: Handling and Management of Chemical Hazards, Updated Version" published by the National Academies

Natelson, Douglas

35

Dynamics of kicked particles in a double-barrier structure  

E-Print Network [OSTI]

We study the classical and quantum dynamics of periodically kicked particles placed initially within an open double-barrier structure. This system does not obey the Kolmogorov-Arnold-Moser (KAM) theorem and displays chaotic dynamics. The phase space features induced by non-KAM nature of the system leads to dynamical features such as the non-equilibrium steady state, classically induced saturation of energy growth and momentum filtering. We also comment on the experimental feasibility of this system as well as its relevance in the context of current interest in classically induced localization and chaotic ratchets.

Harinder Pal; M. S. Santhanam

2010-11-29T23:59:59.000Z

36

Constraining white-dwarf kicks in globular clusters : III. Cluster Heating  

E-Print Network [OSTI]

Recent observations of white dwarfs in globular clusters indicate that these stars may get a velocity kick during their time as giants. This velocity kick could originate naturally if the mass loss while on the asymptotic giant branch is slightly asymmetric. The kicks may be large enough to dramatically change the radial distribution of young white dwarfs, giving them larger energies than other stars in the cluster. As these energetic white dwarfs travel through the cluster they can impart their excess energy on the other stars in the cluster. This new heat source for globular clusters is expected to be largest during the clusters' youth.

Jeremy S. Heyl

2009-03-31T23:59:59.000Z

37

FY 2015 Small Business Kick-off Forum | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2015 Small Business Kick-off Forum October 22, 2014 8:30AM to 3:00PM EDT Department of Energy Headquarters - Forrestal Building - East Plaza 1000 Independence Avenue, SW...

38

Kicking Off the ARPA-E Energy Innovation Summit: Where Innovations...  

Broader source: Energy.gov (indexed) [DOE]

rest of the world, tapping the creativity and imagination of our people." The ARPA-E Energy Innovation Summit that kicks off today just outside of Washington, D.C. highlights the...

39

Neutrino trigger of the magnetorotational mechanism of a natal-pulsar kick  

SciTech Connect (OSTI)

A mechanism generating a natal-neutron-star kick and involving only standard neutrinos is discussed. In this mechanism, the neutrino effect on the plasma of the supernova-core envelope in a magnetorotational explosion accompanied by the generation of a strong toroidal magnetic field leads to a redistribution of the magnetic field B in the 'upper' and 'lower' hemispheres of the supernova-core envelope. The emerging asymmetry of the magnetic-field pressure may generate a natal-pulsar kick.

Kuznetsov, A. V., E-mail: avkuzn@uniyar.ac.ru; Mikheev, N. V., E-mail: mikheev@uniyar.ac.ru [Yaroslavl State Universiry (Russian Federation)

2013-10-15T23:59:59.000Z

40

The Radiative Kicked Oscillator: A Stochastic Web or Chaotic Attractor ?  

E-Print Network [OSTI]

A relativistic charged particle moving in a uniform magnetic field and kicked by an electric field is considered. Under the assumption of small magnetic field, an iterative map is developed. We consider both the case in which no radiation is assumed and the radiative case, using the Lorentz-Dirac equation to describe the motion. Comparison between the non-radiative case and the radiative case shows that in both cases one can observe a stochastic web structure for weak magnetic fields, and, although there are global differences in the result of the map, that both cases are qualitatively similar in their small scale behavior. We also develop an iterative map for strong magnetic fields. In that case the web structure no longer exists; it is replaced by a rich chaotic behavior. It is shown that the particle does not diffuse to infinite energy; it is limited by the boundaries of an attractor (the boundaries are generally much smaller than light velocity). Bifurcation occurs, converging rapidly to Feigenbaum's universal constant. The chaotic behavior appears to be robust. For intermediate magnetic fields, it is more difficult to observe the web structure, and the influence of the unstable fixed point is weaker.

Y. Ashkenazy; L. P. Horwitz

1999-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Transverse Kick Analysis of SSR1 Due to Possible Geometrical Variations in Fabrication  

SciTech Connect (OSTI)

Due to fabrication tolerance, it is expected that some geometrical variations could happen to the SSR1 cavities of Project X, like small shifts in the transverse direction of the beam pipe or the spoke. It is necessary to evaluate the resultant transverse kick due to these geometrical variations, in order to make sure that they are within the limits of the correctors in the solenoids. In this paper, we report the transverse kick values for various fabrications errors and the sensitivity of the beam to these errors. Transverse kick that could happen in SSR1 cavities due to geometrical variations of the fabricated cavities from the designed geometry has been analysed and evaluated. From fabrication experience, three kinds of variations were under investigation concerning the alignment of both the beam pipe and spoke with respect to the beam axis. Simulation study has been carried out implementing these variations in the simulation model. CMM measurements of five fabricated SSR1 cavities were carried out to investigate the amount of physical misalignments of the beam pipe and spoke. Bead-pull measurements were also conducted to evaluate the transverse kick values in the fabricated cavities. Simulation and measurements are relatively in good agreement. Maximum kick in the fabricated cavities is within 154 keV that would induce about 1.12 mrad beam deviation, which could be definitely corrected with the 10 mrad specified correctors of Project X.

Yakovlev, V.P.; /Fermilab; Awida, M.H.; Berrutti, P.; Gonin, I.V.; Khabiboulline, T.N.; /Fermilab

2012-05-01T23:59:59.000Z

42

Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG) Kick-Off Meeting Proceedings Hilton Garden Inn-BWI,Baltimore, MD October 24, 2006  

Broader source: Energy.gov [DOE]

Proceedings from the October 24, 2006 Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group Kick-Off Meeting.

43

Pulsar Kicks Induced by Spin Flavor Oscillations of Neutrinos in Gravitational Fields  

E-Print Network [OSTI]

The origin of pulsar kicks is reviewed in the framework of the spin-flip conversion of neutrinos propagating in the gravitational field of a magnetized protoneutron star. We find that for a mass in rotation with angular velocity ${\\bbox \\omega}$, the spin connections entering in the Dirac equation give rise to the coupling term ${\\bbox \\omega}\\cdot {\\bf p}$, being ${\\bf p}$ the neutrino momentum. Such a coupling can be responsible of pulsar kicks owing to the neutrino emission asymmetry generated by the relative orientation of ${\\bf p}$ with respect to ${\\bbox \\omega}$. For our estimations, the large non standard neutrino magnetic momentum, $\\mu_\

G. Lambiase

2005-07-15T23:59:59.000Z

44

Robust Execution of Temporally Flexible Plans for Bipedal Walking Devices  

E-Print Network [OSTI]

walking machine. An example task for such a system is to walk to a soccer ball and kick it, as shown 02139 hofma@csail.mit.edu, williams@mit.edu Abstract Robotic wheeled rovers have been successfully controlled by activity execution systems that use plans with temporal flexibility to adapt to disturbances

Williams, Brian C.

45

Wakefield and RF Kicks Due to Coupler Asymmetry in TESLA-Type Accelerating Cavities  

SciTech Connect (OSTI)

In a future linear collider, such as the International Linear Collider (ILC), trains of high current, low emittance bunches will be accelerated in a linac before colliding at the interaction point. Asymmetries in the accelerating cavities of the linac will generate fields that will kick the beam transversely and degrade the beam emittance and thus the collider performance. In the main linac of the ILC, which is filled with TESLA-type superconducting cavities, it is the fundamental (FM) and higher mode (HM) couplers that are asymmetric and thus the source of such kicks. The kicks are of two types: one, due to (the asymmetry in) the fundamental RF fields and the other, due to transverse wakefields that are generated by the beam even when it is on axis. In this report we calculate the strength of these kicks and estimate their effect on the ILC beam. The TESLA cavity comprises nine cells, one HM coupler in the upstream end, and one (identical, though rotated) HM coupler and one FM coupler in the downstream end (for their shapes and location see Figs. 1, 2) [1]. The cavity is 1.1 m long, the iris radius 35 mm, and the coupler beam pipe radius 39 mm. Note that the couplers reach closer to the axis than the irises, down to a distance of 30 mm.

Bane, K.L.F.; Adolphsen, C.; Li, Z.; /SLAC; Dohlus, M.; Zagorodnov, I.; /DESY; Gonin, I.; Lunin, A.; Solyak, N.; Yakovlev, V.; /Fermilab; Gjonaj, E.; Weiland, T.; /Darmstadt, Tech. Hochsch.

2008-07-07T23:59:59.000Z

46

Can quantum fractal fluctuations be observed in an atom-optics kicked rotor experiment?  

E-Print Network [OSTI]

We investigate the parametric fluctuations in the quantum survival probability of an open version of the delta-kicked rotor model in the deep quantum regime. Spectral arguments [Guarneri I and Terraneo M 2001 Phys. Rev. E vol. 65 015203(R)] predict the existence of parametric fractal fluctuations owing to the strong dynamical localisation of the eigenstates of the kicked rotor. We discuss the possibility of observing such dynamically-induced fractality in the quantum survival probability as a function of the kicking period for the atom-optics realisation of the kicked rotor. The influence of the atoms' initial momentum distribution is studied as well as the dependence of the expected fractal dimension on finite-size effects of the experiment, such as finite detection windows and short measurement times. Our results show that clear signatures of fractality could be observed in experiments with cold atoms subjected to periodically flashed optical lattices, which offer an excellent control on interaction times and the initial atomic ensemble.

Andrea Tomadin; Riccardo Mannella; Sandro Wimberger

2005-12-01T23:59:59.000Z

47

Psycho? Logical? Bulletin! Department Kick Ball (pg 2)  

E-Print Network [OSTI]

are like feathers on a snake. The passive voice is to be ignored. Eliminate commas, that are, not necessary in the Kotovsky attic. They are planning an open house next weekend. You can enter through the hole off the gutter

48

Detailed search Miscellaneous  

E-Print Network [OSTI]

Search Go Detailed search Miscellaneous Press sources (PhysicsWeb.org) Based on information from press sources (PhysicsWeb.org) Scientific Research; Nuclear Fusion; Renewable Sources of Energy

49

Kick Off Meeting for New Fuel Cell Projects  

E-Print Network [OSTI]

4. Standard Reporting Requirements 5. Hydrogen Safety Plan 6. 2011 FCT Program Annual Merit Review 7. Annual Progress Report 2 #12;Role of the Golden Field OfficeRole of the Golden Field Office · Golden (GO for EERE Programs ­ Fuel Cell Technologies ­ Biomass ­ S lSolar ­ Wind/Water ­ Geothermal ­ Industrial

50

Attention to Detail | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis Aerosol STATEMENTAttention to Detail

51

Quantum chaos of a kicked particle in a 1D infinite square potential well  

E-Print Network [OSTI]

We study quantum chaos in a non-KAM system, i.e. a kicked particle in a one-dimensional infinite square potential well. Within the perturbative regime the classical phase space displays stochastic web structures, and the diffusion coefficient D in the regime increases with the perturbative strength K giving a scaling $D \\propto K^{2.5}$, and in the large K regime D goes as K^2. Quantum mechanically, we observe that the level spacing statistics of the quasi eigenenergies changes from Poisson to Wigner distribution as the kick strength increases. The quasi eigenstates show power-law localization in the small K region, which become extended one at large K. Possible experimental realization of this model is also discussed.

Baowen Li; Jie Liu; Yan Gu; Bambi Hu

1999-03-03T23:59:59.000Z

52

Entanglement production in coupled chaotic systems : Case of the Kicked Tops  

E-Print Network [OSTI]

Entanglement production in coupled chaotic systems is studied with the help of kicked tops. Deriving the correct classical map, we have used the reduced Husimi function, the Husimi function of the reduced density matrix, to visualize the possible behaviors of a wavepacket. We have studied a phase space based measure of the complexity of a state and used random matrix theory (RMT) to model the strongly chaotic cases. Extensive numerical studies have been done for the entanglement production in coupled kicked tops corresponding to different underlying classical dynamics and different coupling strengths. An approximate formula, based on RMT, is derived for the entanglement production in coupled strongly chaotic systems. This formula, applicable for arbitrary coupling strengths and also valid for long time, complements and extends significantly recent perturbation theories for strongly chaotic weakly coupled systems.

Jayendra N. Bandyopadhyay; Arul Lakshminarayan

2003-10-22T23:59:59.000Z

53

1992 CBECS Detailed Tables  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved Reserves (Billion Cubic Feet)WyomingSquare Feet 50,001.6.A.0.EastDetailed

54

Huizenga Kicks Off Waste Management Conference | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013Department ofThis brief detailsTheOwn|HowardEM

55

Calculation of the transverse kicks generated by the bends of a hollow electron lens  

SciTech Connect (OSTI)

Electron lenses are pulsed, magnetically confined electron beams whose current-density profile is shaped to obtain the desired effect on the circulating beam in high-energy accelerators. They were used in the Fermilab Tevatron collider for abort-gap clearing, beam-beam compensation, and halo scraping. A beam-beam compensation scheme based upon electron lenses is currently being implemented in the Relativistic Heavy Ion Collider at Brookhaven National Laboratory. This work is in support of a conceptual design of hollow electron beam scraper for the Large Hadron Collider. It also applies to the implementation of nonlinear integrable optics with electron lenses in the Integrable Optics Test Accelerator at Fermilab. We consider the axial asymmetries of the electron beam caused by the bends that are used to inject electrons into the interaction region and to extract them. A distribution of electron macroparticles is deposited on a discrete grid enclosed in a conducting pipe. The electrostatic potential and electric fields are calculated using numerical Poisson solvers. The kicks experienced by the circulating beam are estimated by integrating the electric fields over straight trajectories. These kicks are also provided in the form of interpolated analytical symplectic maps for numerical tracking simulations, which are needed to estimate the effects of the electron lens imperfections on proton lifetimes, emittance growth, and dynamic aperture. We outline a general procedure to calculate the magnitude of the transverse proton kicks, which can then be generalized, if needed, to include further refinements such as the space-charge evolution of the electron beam, magnetic fields generated by the electron current, and longitudinal proton dynamics.

Stancari, Giulio

2014-03-25T23:59:59.000Z

56

Kick-Off Meeting for New Fuel Cell Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington, DC 20585on253.16582104)KeyBillyKick-Off

57

Catalysis Working Group Kick-Off Meeting: May 2012 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 20154:04-21-2014Innovative EnergyKick-Off Meeting: May 2012

58

All Hands Kick-off Meeting | MIT-Harvard Center for Excitonics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUCProductstwrmrAre theAdministratorCFMFusion ResearchAndrewPortalKick-off

59

LANL Fuel Cell Research 1HFCIT Program Kick-off Meeting, Arlington, VA, February 13-14, 2007  

E-Print Network [OSTI]

physicochemical characterization, electrochemical and fuel cell testing · Optimize catalysts, supportsLANL Fuel Cell Research 1HFCIT Program Kick-off Meeting, Arlington, VA, February 13-14, 2007 Laboratory Hydrogen, Fuel Cells and Infrastructure Technologies Radoslav Adzic Paolina Atanassova Cabot

60

Kick Start Your Conversations These questions may help you dive deeper with your mentee and discover how you can most  

E-Print Network [OSTI]

Kick Start Your Conversations These questions may help you dive deeper with your mentee and discover how you can most effectively help him/her reach his/her leadership development goals. What've completed in the LA seminar, what are your greatest strengths? How can those strengths help you accomplish

Tullos, Desiree

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Quantum and Classical Superballistic Transport in a Relativistic Kicked-Rotor System  

E-Print Network [OSTI]

As an unusual type of anomalous diffusion behavior, superballistic transport is not well known but has been experimentally simulated recently. Quantum superballistic transport models to date are mainly based on connected sublattices which are constructed to have different properties. In this work, we show that both quantum and classical superballistic transport in the momentum space can occur in a simple periodically driven Hamiltonian system, namely, a relativistic kicked-rotor system with a nonzero mass term. The nonzero mass term essentially realizes a junction-like scenario: regimes with low or high momentum values have different dispersion relations and hence different transport properties. It is further shown that the quantum and classical superballistic transport should occur under much different choices of the system parameters. The results are of interest to studies of anomalous transport, quantum and classical chaos, and the issue of quantum-classical correspondence.

Qifang Zhao; Cord A. Muller; Jiangbin Gong

2014-05-27T23:59:59.000Z

62

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

63

Computed tomography:the details.  

SciTech Connect (OSTI)

Computed Tomography (CT) is a well established technique, particularly in medical imaging, but also applied in Synthetic Aperture Radar (SAR) imaging. Basic CT imaging via back-projection is treated in many texts, but often with insufficient detail to appreciate subtleties such as the role of non-uniform sampling densities. Herein are given some details often neglected in many texts.

Doerry, Armin Walter

2007-07-01T23:59:59.000Z

64

Developing Standard Logic for a Detailed Engineering Project Schedule in the Process Industry  

E-Print Network [OSTI]

Planning Meeting (IPPM) for a standard detailed engineering project in the process industry will be used to develop scheduling logic for use in developing detail engineering project schedules. However, because the IPPM does not clearly distinguish...

Miller-Karns, Kara A.

2009-05-15T23:59:59.000Z

65

Medical Plan Detail Document for Funded Graduate Students  

E-Print Network [OSTI]

Orthotic Devices Outpatient Services Physical Therapy Prosthetic Appliances Radiology Smoking cessation-of-Area Benefit 50 Definitions 56 MHCS Pediatric Preventive Care Guidelines 62 MHCS Health Maintenance `Physical

66

Detailed Work Plan for Development of a Hawai`i  

E-Print Network [OSTI]

Subtask 9.1 First Deliverable By the University of Hawaii Hawaii Natural Energy Institute School of Ocean energy and economic security and sustainability. Moreover, unlike wind, solar, geothermal, or ocean.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC-06NT42847

67

Statistical properties of the localization measure in a finite-dimensional model of the quantum kicked rotator  

E-Print Network [OSTI]

We study the quantum kicked rotator in the classically fully chaotic regime $K=10$ and for various values of the quantum parameter $k$ using Izrailev's $N$-dimensional model for various $N \\le 3000$, which in the limit $N \\rightarrow \\infty$ tends to the exact quantized kicked rotator. By numerically calculating the eigenfunctions in the basis of the angular momentum we find that the localization length ${\\cal L}$ for fixed parameter values has a certain distribution, in fact its inverse is Gaussian distributed, in analogy and in connection with the distribution of finite time Lyapunov exponents of Hamilton systems. However, unlike the case of the finite time Lyapunov exponents, this distribution is found to be independent of $N$, and thus survives the limit $N=\\infty$. This is different from the tight-binding model of Anderson localization. The reason is that the finite bandwidth approximation of the underlying Hamilton dynamical system in the Shepelyansky picture (D.L. Shepelyansky, {\\em Phys. Rev. Lett.} {\\bf 56}, 677 (1986)) does not apply rigorously. This observation explains the strong fluctuations in the scaling laws of the kicked rotator, such as e.g. the entropy localization measure as a function of the scaling parameter $\\Lambda={\\cal L}/N$, where $\\cal L$ is the theoretical value of the localization length in the semiclassical approximation. These results call for a more refined theory of the localization length in the quantum kicked rotator and in similar Floquet systems, where we must predict not only the mean value of the inverse of the localization length $\\cal L$ but also its (Gaussian) distribution, in particular the variance. In order to complete our studies we numerically analyze the related behavior of finite time Lyapunov exponents in the standard map and of the 2$\\times$2 transfer matrix formalism. This paper is extending our recent work.

T Manos; M Robnik

2015-01-21T23:59:59.000Z

68

Clemson University Detailed Assessment Report  

E-Print Network [OSTI]

, and Action Plans O 1: Oral and written communication skills Upon graduation, students will be able Priorities 1.1 Excel in teaching at both the undergraduate and graduate levels 3.2 Promote high graduation in their classes and through a test preparation session on written communication skills. M 2: Oral capstone project

Bolding, M. Chad

69

Cooperative Education Detailed Operational Procedures  

E-Print Network [OSTI]

credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

de Doncker, Elise

70

Improving alternative fuel utilization: detailed kinetic combustion...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Improving alternative fuel utilization: detailed kinetic combustion modeling & experimental testing Improving alternative fuel utilization: detailed kinetic combustion modeling &...

71

Plan generation strategies for a knowledge based process planning system  

E-Print Network [OSTI]

-12. Checking Manufacturability at Site 3-13. Plan Alternate Process 3-14. Review Plans Critically 3-15. Plan Refinement 3-16. Evaluation of Plans 45 47 48 49 50 52 3-17. Detail Plan 53 3-18. Understanding Part Features 55 3-19. Evolving... manufacturing system where quick decisions have to be made on the shop when production is interrupted for contingencies. 15 2. 3. 2 The Generative Approach A generative process planning system synthesizes new process plans automatically. It enables...

Hari, Umesh

1993-01-01T23:59:59.000Z

72

awareness plan revision: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

initial planning with a more detailed project when the precondi- tions for the decommissioning are known 135 COMPLIANCE ASSIST PLANNING USER GUIDE Chemistry Websites Summary:...

73

Crump Geyser: High Precision Geophysics & Detailed Structural...  

Broader source: Energy.gov (indexed) [DOE]

Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well...

74

Implementation Plan for the Irradiated Materials Characterization Laboratory (IMCL)  

SciTech Connect (OSTI)

This document contains details regarding the planned implementation of the Irradiated Materials Characterization Laboratory at the INL.

Not Listed

2013-04-01T23:59:59.000Z

75

Early Arrival Program Kicks of Autumn Semester for ODI Scholars Making the transition from high school graduate to college student can be, at best, a challenge  

E-Print Network [OSTI]

Early Arrival Program Kicks of Autumn Semester for ODI Scholars Making the transition from high include priority management, the development of peer and professional relationships, and information #12;attendees have commented on the sense of brotherhood that made easier the transition from high

Howat, Ian M.

76

Toward an Empirical Theory of Pulsar Emission XI. Understanding the Orientations of Pulsar Radiation and Supernova "Kicks"  

E-Print Network [OSTI]

Two entwined problems have remained unresolved since pulsars were discovered nearly 50 years ago: the orientation of their polarized emission relative to the emitting magnetic field and the direction of putative supernova ``kicks' relative to their rotation axes. The rotational orientation of most pulsars can be inferred only from the (``fiducial') polarization angle of their radiation, when their beam points directly at the Earth and the emitting polar fluxtube field is $\\parallel$ to the rotation axis. Earlier studies have been unrevealing owing to the admixture of different types of radiation (core and conal, two polarization modes), producing both $\\parallel$ or $\\perp$ alignments. In this paper we analyze the some 50 pulsars having three characteristics: core radiation beams, reliable absolute polarimetry, and accurate proper motions. The ``fiducial' polarization angle of the core emission, we then find, is usually oriented $\\perp$ to the proper-motion direction on the sky. As the primary core emission i...

Rankin, Joanna M

2015-01-01T23:59:59.000Z

77

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

78

Transportation Institutional Plan  

SciTech Connect (OSTI)

This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

Not Available

1986-08-01T23:59:59.000Z

79

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network [OSTI]

a detailed cost estimate. F. PROJECT PLANNING GUIDE (PPG): This document is required for all State fundedCAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate

California at Santa Barbara, University of

80

Impacted material placement plans  

SciTech Connect (OSTI)

Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility.

Hickey, M.J.

1997-01-29T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

82

Crump Geyser: High Precision Geophysics & Detailed Structural...  

Broader source: Energy.gov (indexed) [DOE]

Crump Geyser: High Precision Geophysics & Detailed Structural Exploration & Slim Well Drilling John Casteel Nevada Geothermal Power Co. Validation of Innovative Exploration...

83

Running GL Detail Report (also known as Department Detail Report) Initial PeopleSoft Screen  

E-Print Network [OSTI]

Running GL Detail Report (also known as Department Detail Report) Initial PeopleSoft Screen Select BSU Processes and Reports #12;Select GL Detail Report The page below will open. At this point you will have two options: #12;Option 1: If you have never run a GL Detail Report you will need to choose "Add

Barrash, Warren

84

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

85

NIF Title III engineering plan  

SciTech Connect (OSTI)

The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

Deis, G

1998-06-01T23:59:59.000Z

86

The Sellafield Plan - 12458  

SciTech Connect (OSTI)

The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

Irving, Iain [Stakeholder Relations Director, Sellafield Ltd, Cumbria (United Kingdom)

2012-07-01T23:59:59.000Z

87

Simulating plant motion with levels of detail  

E-Print Network [OSTI]

SIMULATING PLANT MOTION WITH LEVELS OF DETAIL A Senior Honors Thesis by REBECCA LYNN FLANNERY Submitted to the Office of Honors Programs k. Academic Scholarships Texas AkM University in partial fulfillment of the requirements... of the UNIVERSITY UNDERGRADUATE RESEARCH FELLOWS April 2003 Group: Engineering & Physics I SIMULATING PLANT MOTION WITH LEVELS OF DETAIL A Senior Honors Thesis by REBECCA LYNN FLANNERY Submitted to the Office of Honors Programs & Academic Scholarships...

Flannery, Rebecca Lynn

2013-02-22T23:59:59.000Z

88

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

89

FY 2007/2008 Contractor Performance Plan, Volume 1  

SciTech Connect (OSTI)

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

90

FY 2007/2008 Contractor Performance Plan, Volume 2  

SciTech Connect (OSTI)

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

91

Business Plan of a Motorcycle Company : Case: Motosi Oy.  

E-Print Network [OSTI]

??The purpose of this Thesis is to explain in detail the Business plan of Motosi Oy. The company is a small start-up company that buys (more)

Ranne, Jukka

2011-01-01T23:59:59.000Z

92

RENDERING FILTERS FOR CONTROLLING DETAIL AND  

E-Print Network [OSTI]

RENDERING FILTERS FOR CONTROLLING DETAIL AND CREATING EFFECTS CHRISTOPHER ROBERT DECORO may be unified under the general theme of the rendering filter. Generally stated, such a filter is a passive, stateless operator that acts upon a decomposition of terms in the rendering equation

93

Detailed Financial Procedures Page 1 of 3  

E-Print Network [OSTI]

Detailed Financial Procedures Page 1 of 3 Inventories and Disposals Background In accordance with Standing Financial Regulation, Heads of Departments are responsible for maintaining inventories for all disposals thereof. (Ref 8.03 & 8.06) Inventory Spreadsheet The following information should be recorded

Levi, Ran

94

Contact Details Journeying Beyond Breast Cancer  

E-Print Network [OSTI]

Home About Contact Details Facebook Search Journeying Beyond Breast Cancer making sense of the cancer experience Feeds: Posts Comments Cancer-fighting fountain pen May 20, 2009 by JBBC A research team be used both as a research tool in the development of next-generation cancer treatments

Espinosa, Horacio D.

95

Contact details: School of Architecture, BCU  

E-Print Network [OSTI]

With 90% of the UK population living in urban areas, improving urban sustainability has become a pressing Economic Fabric This work package investigated opportunities and barriers to achieving sustainable is to be sustainable in the widest sense. Contact details: Centre for Urban and Regional Studies, U0B Dr. Austin Barber

Birmingham, University of

96

Well test plan for the City of El Centro utility core field experiment  

SciTech Connect (OSTI)

The following are included in the well test plan: well test program schedule and order of work; the injection well drilling program details; the production well drilling program details; and long-term (30-day) production testing program details. (MHR)

Not Available

1981-06-15T23:59:59.000Z

97

Structural concepts and details for seismic design  

SciTech Connect (OSTI)

This manual discusses building and building component behavior during earthquakes, and provides suggested details for seismic resistance which have shown by experience to provide adequate performance during earthquakes. Special design and construction practices are also described which, although they might be common in some high-seismic regions, may not be common in low and moderate seismic-hazard regions of the United States. Special attention is given to describing the level of detailing appropriate for each seismic region. The UBC seismic criteria for all seismic zones is carefully examined, and many examples of connection details are given. The general scope of discussion is limited to materials and construction types common to Department of Energy (DOE) sites. Although the manual is primarily written for professional engineers engaged in performing seismic-resistant design for DOE facilities, the first two chapters, plus the introductory sections of succeeding chapters, contain descriptions which are also directed toward project engineers who authorize, review, or supervise the design and construction of DOE facilities. 88 refs., 188 figs.

Not Available

1991-09-01T23:59:59.000Z

98

Bringing Scenario Planning Home to KU  

E-Print Network [OSTI]

of the scenario workshop participants subsequently served on the libraries strategic-planning groups. As the Steering Committee began conducting an environmental scan with a detailed SWOT analysis, the earlier scenario activities appeared to have both informed...

Church-Duran, Jennifer; Ludwig, Deborah

2012-03-01T23:59:59.000Z

99

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

100

Technical planning activity: Final report  

SciTech Connect (OSTI)

In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

Not Available

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Details of U.S. Climate Zones:  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S.30Natural Gas Glossary529 633 622 56623 4623 42YearDelawareDetails of U.S.

102

CBECS 1992 - Building Characteristics, Detailed Tables  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS98,,,1999,0,0,1e+15,1469,6,01179,"WAT","HY"Tables andA 6 J (MillionCubic35775 84 8711757Detailed

103

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look at RNA

104

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look at

105

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed Look

106

First Detailed Look at RNA Dicer  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityField OfficeFirm Uses DOE's FastestDetailed

107

Savannah River Site Environmental Implementation Plan  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

108

Environmental Planning and Ecology Program Annual Report.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2008-01-01T23:59:59.000Z

109

Aerocapacitor commercialization plan  

SciTech Connect (OSTI)

The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

NONE

1995-09-12T23:59:59.000Z

110

High performance computing and communications: FY 1997 implementation plan  

SciTech Connect (OSTI)

The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

NONE

1996-12-01T23:59:59.000Z

111

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

112

ACQUISITION PLANNING  

Office of Environmental Management (EM)

7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

113

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

114

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

115

Description of Axial Detail for ROK Fuel  

SciTech Connect (OSTI)

For the purpose of NDA simulations of the ROK fuel assemblies, we have developed an axial burnup distribution to represent the pins themselves based on gamma scans of rods in the G23 assembly. For the purpose of modeling the G23 assembly (both at ORNL and LANL), the pin-by-pin burnup map as simulated by ROK is being assumed to represent the radial burnup distribution. However, both DA and NDA results indicate that this simulated estimate is not 100% correct. In particular, the burnup obtained from the axial gamma scan of 7 pins does not represent exactly the same 'average' pin burnup as the ROK simulation. Correction for this discrepancy is a goal of the well-characterized assembly task but will take time. For now, I have come up with a correlation for 26 axial points of the burnup as obtained by gamma scans of 7 different rods (C13, G01, G02, J11, K10, L02, and M04, neglecting K02 at this time) to the average burnup given by the simulation for each of the rods individually. The resulting fraction in each axial zone is then averaged for the 7 different rods so that it can represent every fuel pin in the assembly. The burnup in each of the 26 axial zones of rods in all ROK assemblies will then be directly adjusted using this fraction, which is given in Table 1. Note that the gamma scan data given by ROK for assembly G23 included a length of {approx}3686 mm, so the first 12 mm and the last 14 mm were ignored to give an actual rod length of {approx}366 cm. To represent assembly F02 in which no pin-by-pin burnup distribution is given by ROK, we must model it using infinitely-reflected geometry but can look at the effects of measuring in different axial zones by using intermediate burnup files (i.e. smaller burnups than 28 GWd/MTU) and determining which axial zone(s) each burnup represents. Details for assembly F02 are then given in Tables 2 and 3, which is given in Table 1 and has 44 total axial zones to represent the top meter in explicit detail in addition to the other 26 zones. Note that the MCNP files for F02 were created using the Monte Carlo burnup linkage code Monteburns, which saves MCNP input files with detailed compositions as a function of burnup. The 'intermediate burnup files' produced for F02 include a cooling time of 27 years. The axial location of 5 spacers was also included in the ROK F02 assembly in which each spacer contained a length of 3.81 cm. Note that due to the nature of Monteburns, which was run in a special fashion for this problem, the step number increments after the 27 year decay, so the second column of Table 2 refers to the step number that should be used in the Monteburns files.

Trellue, Holly R [Los Alamos National Laboratory; Galloway, Jack D [Los Alamos National Laboratory

2012-04-20T23:59:59.000Z

116

Detailed Assessment of Particulate Characteristics from Low-Temperatur...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion Engines Detailed Assessment of Particulate Characteristics from Low-Temperature Combustion...

117

Atomic detail brownian dynamics simulations of concentrated protein...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

detail brownian dynamics simulations of concentrated protein solutions with a mean field treatment of hydrodynamic Atomic detail brownian dynamics simulations of concentrated...

118

Improving Combustion Software to Solve Detailed Chemical Kinetics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Combustion Software to Solve Detailed Chemical Kinetics for HECC Improving Combustion Software to Solve Detailed Chemical Kinetics for HECC 2012 DOE Hydrogen and Fuel Cells Program...

119

Residential Windows and Window Coverings: A Detailed View of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Residential Windows and Window Coverings: A Detailed View of the Installed Base and User Behavior Residential Windows and Window Coverings: A Detailed View of the Installed Base...

120

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

None

1988-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Boston College Comprehensive Emergency Management Plan January 2014 BOSTON COLLEGE  

E-Print Network [OSTI]

. Preparedness is operationally focused on establishing guidelines, plans, procedures, protocols, and standards Operations Center 27 Appendix G Acronyms 28 Campus Map 29 Addendum Detailed Operation Procedures (under 9 Meetings 10 Plans Development and Maintenance 10 Plan Review, Testing, and Exercises 11 Training

Huang, Jianyu

122

Ancillary-service details: Dynamic scheduling  

SciTech Connect (OSTI)

Dynamic scheduling (DS) is the electronic transfer from one control area to another of the time-varying electricity consumption associated with a load or the time-varying electricity production associated with a generator. Although electric utilities have been using this technique for at least two decades, its use is growing in popularity and importance. This growth is a consequence of the major changes under way in US bulk-power markets, in particular efforts to unbundle generation from transmission and to increase competition among generation providers. DS can promote competition and increase choices. It allows consumers to purchase certain services from entities outside their physical-host area and it allows generators to sell certain services to entities other than their physical host. These services include regulation (following minute-to-minute variations in load) and operating reserves, among others. Such an increase in the number of possible suppliers and customers should encourage innovation and reduce the costs and prices of providing electricity services. The purpose of the project reported here was to collect and analyze data on utility experiences with DS. Chapter 2 provides additional details and examples of the definitions of DS. Chapter 3 explains why DS might be an attractive service that customers and generators, as well as transmission providers, might wan to use. Chapter 4 presents some of the many current DS examples the authors uncovered in their interviews. Chapter 5 discusses the costs and cost-effectiveness of DS. Chapter 6 explains what they believe can and cannot be electronically moved from one control area to another, primarily in terms of the six ancillary services that FERC defined in Order 888. Chapter 7 discusses the need for additional research on DS.

Hirst, E.; Kirby, B.

1997-01-01T23:59:59.000Z

123

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

124

Medical Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical Plans

125

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process1/7/2010

126

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

127

Selected components of an oil spill contingency plan model  

E-Print Network [OSTI]

of Responsibility Section 311 of the Clean Water Act or FWPCA gave the President the responsibility for issuing the National Oil and Hazardous Substances Pollution Contingency Plan (The Plan). In turn, this task was delegated to the Council on Environmental... administratively oriented, i. e. management personnel are assigned spill-related tasks but the tools needed to carry out the response are not detailed in the plan. Other plans focus primarily an the response phase, neglecting pre-spill deci- sions. Oil spill...

Starnater, Carol Elizabeth

1985-01-01T23:59:59.000Z

128

Plan Your School Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

129

Milestone Plan Process Improvement  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the...

130

Energy planning and management plan  

SciTech Connect (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

131

Human Factors Considerations in New Nuclear Power Plants: Detailed Analysis.  

SciTech Connect (OSTI)

This Nuclear Regulatory Commission (NRC) sponsored study has identified human-performance issues in new and advanced nuclear power plants. To identify the issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were organized into seven high-level HFE topic areas: Role of Personnel and Automation, Staffing and Training, Normal Operations Management, Disturbance and Emergency Management, Maintenance and Change Management, Plant Design and Construction, and HFE Methods and Tools. The issues where then prioritized into four categories using a 'Phenomena Identification and Ranking Table' methodology based on evaluations provided by 14 independent subject matter experts. The subject matter experts were knowledgeable in a variety of disciplines. Vendors, utilities, research organizations and regulators all participated. Twenty issues were categorized into the top priority category. This Brookhaven National Laboratory (BNL) technical report provides the detailed methodology, issue analysis, and results. A summary of the results of this study can be found in NUREG/CR-6947. The research performed for this project has identified a large number of human-performance issues for new control stations and new nuclear power plant designs. The information gathered in this project can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas through regulatory research. Addressing human-performance issues will provide the technical basis from which regulatory review guidance can be developed to meet these challenges. The availability of this review guidance will help set clear expectations for how the NRC staff will evaluate new designs, reduce regulatory uncertainty, and provide a well-defined path to new nuclear power plant licensing.

OHara,J.; Higgins, J.; Brown, W.; Fink, R.

2008-02-14T23:59:59.000Z

132

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two Studies Reveal Details of Lithium-Battery Function Two Studies Reveal Details of Lithium-Battery Function Print Wednesday, 27 February 2013 00:00 Our way of life is deeply...

133

Alternate States of Proteins Revealed by Detailed Energy Landscape Mapping  

E-Print Network [OSTI]

Alternate States of Proteins Revealed by Detailed Energy Landscape Mapping Michael D. Tyka1 Keywords: Rosetta; alternative conformations; protein mobility; structure prediction; validation What through analysis of detailed protein energy landscapes generated by large-scale, native- enhanced sampling

Baker, David

134

Lafayette Metropolitan Planning Organization 2030 Transportation Plan  

E-Print Network [OSTI]

And Development Lafayette Metropolitan Planning Organization 2030 Transportation Plan DRAFT FINAL REPORT Prepared by Neel-Schaffer, Inc... ? 2020 DEFICIENCIES ........................................................................................... 51 FIGURE 11 ? 2030 DEFICIENCIES ........................................................................................... 52 FIGURE 12...

Lafayette Metropolitan Planning Organization

2010-10-31T23:59:59.000Z

135

Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2003  

SciTech Connect (OSTI)

This report presents results obtained from detailed hydrologic characterization of the unconfined aquifer system conducted at the Hanford Site.

Spane, Frank A.; Newcomer, Darrell R.

2004-09-13T23:59:59.000Z

136

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

137

How to use the Weblinks GL Transaction Detail Rollup Template  

E-Print Network [OSTI]

How to use the Weblinks GL Transaction Detail Rollup Template Issue Details The following instructions will show you how to utilize Excel to summarize the Weblinks GL Transaction Detail report so Instructions: 1. Create a Weblinks report 2. Export to Excel 3. Open the Excel 4. Copy and paste to Weblinks GL

Yamamoto, Keith

138

UoS Motor Accident Report Form COMPANY DETAILS  

E-Print Network [OSTI]

UNIV01FL02 UoS Motor Accident Report Form COMPANY DETAILS INSURED: University of Sussex ADDRESS: LOCATION: DESCRIPTION OF HOW ACCIDENT HAPPENED: PLEASE DRAW A SKETCH OF THE ACCIDENT: #12;DRIVER DETAILS: PREVIOUS ACCIDENTS: ADDRESS: VEHICLE DETAILS DATE VEHICLE PURCHASED: MAKE/MODEL: REGISTRATION: MILEAGE

Sussex, University of

139

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

140

Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

142

SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN  

SciTech Connect (OSTI)

This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

2012-11-26T23:59:59.000Z

143

Plans, Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenterYou are here: SN Home page|Plans,

144

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

145

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan Print

146

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan

147

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

Rathbun, Julie A.

148

What is a business plan? A business plan is a tool used to organize a business idea, resources, management and clients. The tool is meant to plan  

E-Print Network [OSTI]

at by investors very carefully. It should detail costs, expenses, capital, break-even analysis, estimated cash1 What is a business plan? A business plan is a tool used to organize a business idea, resources do you get the product to your client(s)? What are the costs to make the product? What should

Johnson, Eric E.

149

Hazardous waste operational plan for site 300  

SciTech Connect (OSTI)

This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.

Roberts, R.S.

1982-02-12T23:59:59.000Z

150

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two Studies Reveal Details of Lithium-Battery Function Print Our way of life is deeply intertwined with battery technologies that have enabled a mobile revolution powering cell...

151

azobenzene detailed mechanism: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Post Graduate Activities Detail & History Materials Science Websites Summary: Raytheon Systems Engineer Tucson AZ MENG Rockwell Collins Mechanical Engineer Sterling VA MENG...

152

A Stochastic Reactor Based Virtual Engine Model Employing Detailed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A Stochastic Reactor Based Virtual Engine Model Employing Detailed Chemistry for Kinetic Studies of In-Cylinder Combustion and Exhaust Aftertreatment A Stochastic Reactor Based...

153

Hanford Site Development Plan  

SciTech Connect (OSTI)

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

154

2030 OCARTS Plan Report  

E-Print Network [OSTI]

......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

Association of Central Oklahoma Governments

155

LCLS Undulator Quadrupole Fiducialization Plan  

SciTech Connect (OSTI)

This note presents the fiducialization plan for the LCLS undulator quadrupoles. The note begins by summarizing the requirements for the fiducialization. A discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage formats are presented. The LCLS is made up of 33 assemblies consisting of an undulator, quadrupole, beam finder wire, and other components mounted on a girder. The components must be mounted in such a way that the beam passes down the axis of each component. In this note, we describe how the ideal beam axis is related to tooling balls on the quadrupole. This step, called fiducialization, is necessary because the ideal beam axis is determined magnetically, whereas tangible objects must be used to locate the quadrupole. The note begins with the list of fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a discussion of the methods used to perform the fiducialization and the methods used to check the results. A detailed fiducialization plan is presented in which all the steps of fiducialization are enumerated. A discussion of the resulting data files and directory structure concludes the note.

Wolf, Zachary; Levashov, Michael; Lundahl, Eric; Reese, Ed; LeCocq, Catherine; Ruland, Robert; /SLAC; ,

2010-11-24T23:59:59.000Z

156

Powering the people: India's capacity expansion plans  

SciTech Connect (OSTI)

India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

Patel, S.

2009-05-15T23:59:59.000Z

157

Site support program plan for ICF Kaiser Hanford Company  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

Dieterle, S.E.

1996-09-27T23:59:59.000Z

158

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

159

Senior Systems Analyst-PeopleSoft Campus Solutions Posting Details  

E-Print Network [OSTI]

and emerging technologies. This position may lead and coordinate the design, development, and implementation assurance and testing activities required to maintain business solutions. This position reportsSenior Systems Analyst-PeopleSoft Campus Solutions Posting Details Posting Details Position Title

Liblit, Ben

160

Adult Football Helmet Detailed Ratings Riddell Revolution Speed  

E-Print Network [OSTI]

Adult Football Helmet Detailed Ratings May 2011 Riddell Revolution Speed Helmet ID SPEED1 SPEED2: A total of 10 adult football helmet models were evaluated using the STAR evaluation system for May 2011.397 0.350 0.322 Overall STAR 0.356 Very Good: Adult Football Helmet Detailed Ratings May 2011 #12

Lu, Chang

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Detailed chemical kinetic oxidation mechanism for a biodiesel Olivier Herbineta  

E-Print Network [OSTI]

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate Olivier Herbineta , William of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO2 production from

Paris-Sud XI, Université de

162

Experimental Test Plan DOE Tidal and River Reference Turbines  

SciTech Connect (OSTI)

Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

2012-09-01T23:59:59.000Z

163

Oracle accrual plans from requirements to implementation  

SciTech Connect (OSTI)

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

Rivera, Christine K [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

164

National Security Technology Incubator Operations Plan  

SciTech Connect (OSTI)

This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

None

2008-04-30T23:59:59.000Z

165

Management Plan Supplement Yakima Subbasin Plan  

E-Print Network [OSTI]

#12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

166

Strategic Energy Planning Webinar  

Broader source: Energy.gov [DOE]

Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in...

167

Accidental Death & Dismemberment Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

168

Strategic Health Workforce Planning  

E-Print Network [OSTI]

May 11, 2013 ... Health workforce planning plays a key role in the United States and ... workforce plans should account for lags implied by training new...

2013-05-11T23:59:59.000Z

169

Underground storage tank management plan  

SciTech Connect (OSTI)

The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

NONE

1994-09-01T23:59:59.000Z

170

Detailed Description of Key NIF Milestones for NNSA Description  

E-Print Network [OSTI]

1 Detailed Description of Key NIF Milestones for NNSA Short Description NIC EP Rev 4.0 Approved = Milestone Reporting Tool, which NNSA uses to support quarterly status reporting of NIC Level 1-2 milestones

171

CMPE 185 Spring 1998 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Spring 1998 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF of the quarter, and 10% on in­class work, Karplus & Larrabee Info 1 #12; 2 Syllabus CMPE 185 Spring 1998

Karplus, Kevin

172

CMPE 185 Fall 1999 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 1999 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2 Syllabus CMPE 185 Fall 1999 4 Special guest lecturers I may arrange to have some guest lectures

Karplus, Kevin

173

CMPE 185 Winter 1999 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Winter 1999 Syllabus 1 Syllabus 1 Administrative details Location and time Porter 144, MWF). Everything must be turned in by the last day of class, Friday March 12. Karplus Info 1 #12; 2 Syllabus CMPE

Karplus, Kevin

174

CMPE 185 Fall 2000 Syllabus 1 1 Administrative details  

E-Print Network [OSTI]

CMPE 185 Fall 2000 Syllabus 1 Syllabus 1 Administrative details Location and time Kresge 327, MWF 2, and need to do the grading mostly on Dec 2. Karplus Info 1 #12; 2 Syllabus CMPE 185 Fall 2000 4 Special

Karplus, Kevin

175

Westinghouse Hanford Company Pollution Prevention Program Implementation Plan  

SciTech Connect (OSTI)

This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

Floyd, B.C.

1994-10-01T23:59:59.000Z

176

Acoustic emission monitoring for assessment of steel bridge details  

SciTech Connect (OSTI)

Acoustic emission (AE) testing was deployed on details of two large steel Interstate Highway bridges: one cantilever through-truss and one trapezoidal box girder bridge. Quantitative measurements of activity levels at known and suspected crack locations were made by monitoring AE under normal service loads (e.g., live traffic and wind). AE indications were used to direct application of radiography, resulting in identification of a previously unknown flaw, and to inform selection of a retrofit detail.

Kosnik, D. E.; Corr, D. J. [Infrastructure Technology Institute, Northwestern University, Evanston, IL 60208 (United States); Hopwood, T. [Kentucky Transportation Center, University of Kentucky, Lexington, KY 40506 (United States)

2011-06-23T23:59:59.000Z

177

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2010-10-01T23:59:59.000Z

178

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2012-08-01T23:59:59.000Z

179

Idaho National Laboratory Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2008-04-01T23:59:59.000Z

180

U.S. Department of Energy Office of Inspector General fiscal year 1999 annual performance plan  

SciTech Connect (OSTI)

This plan is published pursuant to requirements of the Government Performance and Results Act of 1993. The plan outlines the goals, objectives, and strategies that the Office of Inspector General intends to implement and execute in FY 1999. The plan also includes the details of this office`s efforts to continually improve customer service.

NONE

1998-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Geothermal Energy Multi-Year Program Plan, FY 1993-1997  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

None

1992-03-01T23:59:59.000Z

182

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

None

1995-03-03T23:59:59.000Z

183

Motion Planning ! Jana Kosecka!  

E-Print Network [OSTI]

1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

Kosecka, Jana

184

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

185

Intermountain Province Subbasin Plan  

E-Print Network [OSTI]

, and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

186

Development and validation of detailed controls models of the Nelson River Bipole 1 HVDC system  

SciTech Connect (OSTI)

With the Nelson River Bipole 1 mercury arc valve group replacement project and planning for the expansion of the Nelson River HVDC system with a third bipole underway, it was decided to pursue a program to develop and validate detailed models of the existing HVDC transmission facilities and their associated ac systems for use in system studies. The first phase of the program concentrated on the development of detailed controls models associated with the Bipole 1 transmission facility. Based on previous experience at Manitoba Hydro with the Electromagnetic Transient DC simulation program (EMTDC), it was decided that model development and validation would use this program. This paper presents the reasons behind the development of detailed models, the methods used in developing models related to Bipole 1, results of validation tests, difficulties encountered during the process, and the overall benefits resulting from the project. An example of applying the models to investigate a low frequency oscillation which has occurred on the dc system in the past is also presented.

Kuffel, P.; Kent, K.L.; Mazur, G.B.; Weekes, M.A. (Manitoba Hydro, Winnipeg (Canada))

1993-01-01T23:59:59.000Z

187

Details of Forestry Commission and DARDNI Plant Health Contacts for UK Points of Entry UK Principle Ports Contacts Contact Details  

E-Print Network [OSTI]

Ports Contacts Contact Details Felixstowe Richard Fergusson Pat Mitchell Philip Evans Roland Fry Fax Other GB Ports John Hunter Joanne McAuley Fax 0131-314-6148 Tel : 0131-314-6182 or Tel : 0131

188

Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11  

SciTech Connect (OSTI)

The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

Moore, D.A.

1994-09-01T23:59:59.000Z

189

OpenEI Community - planning  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/Geothermal < Oklahomast, 2012CoastfredResultregulatory-roadmapKicks

190

Ground water protection management program plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

191

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

Jenifer Nordstrom

2014-02-01T23:59:59.000Z

192

Los Alamos National Laboratory emergency management plan. Revision 1  

SciTech Connect (OSTI)

The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

Ramsey, G.F.

1998-07-15T23:59:59.000Z

193

Pacific Northwest National Laboratory Institutional Plan FY 2000-2004  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory Institutional Plan for FY 2000-2004 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; management practices and standards; and communications and trust.

Pearson, Erik W.

2000-03-01T23:59:59.000Z

194

Pacific Northwest National Laboratory Institutional Plan FY 2001-2005  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory Institutional Plan for FY 2001-2005 sets forth the laboratory's mission, roles, technical capabilities, and laboratory strategic plan. In the plan, major initiatives also are proposed and the transitioning initiatives are discussed. The Programmatic Strategy section details our strategic intent, roles, and research thrusts in each of the U.S. Department of Energy's mission areas. The Operations/Infrastructure Strategic Plan section includes information on the laboratory's human resources; environment, safety, and health management; safeguards and security; site and facilities management; information resources management; managaement procatices and standards; and communications and trust.

Fisher, Darrell R.; Pearson, Erik W.

2000-12-29T23:59:59.000Z

195

Process of Integrating Screening and Detailed Risk-based Modeling Analyses to Ensure Consistent and Scientifically Defensible Results  

SciTech Connect (OSTI)

To support cleanup and closure of these tanks, modeling is performed to understand and predict potential impacts to human health and the environment. Pacific Northwest National Laboratory developed a screening tool for the United States Department of Energy, Office of River Protection that estimates the long-term human health risk, from a strategic planning perspective, posed by potential tank releases to the environment. This tool is being conditioned to more detailed model analyses to ensure consistency between studies and to provide scientific defensibility. Once the conditioning is complete, the system will be used to screen alternative cleanup and closure strategies. The integration of screening and detailed models provides consistent analyses, efficiencies in resources, and positive feedback between the various modeling groups. This approach of conditioning a screening methodology to more detailed analyses provides decision-makers with timely and defensible information and increases confidence in the results on the part of clients, regulators, and stakeholders.

Buck, John W.; McDonald, John P.; Taira, Randal Y.

2002-11-01T23:59:59.000Z

196

Tile-based Level of Detail for the Parallel Age  

SciTech Connect (OSTI)

Today's PCs incorporate multiple CPUs and GPUs and are easily arranged in clusters for high-performance, interactive graphics. We present an approach based on hierarchical, screen-space tiles to parallelizing rendering with level of detail. Adapt tiles, render tiles, and machine tiles are associated with CPUs, GPUs, and PCs, respectively, to efficiently parallelize the workload with good resource utilization. Adaptive tile sizes provide load balancing while our level of detail system allows total and independent management of the load on CPUs and GPUs. We demonstrate our approach on parallel configurations consisting of both single PCs and a cluster of PCs.

Niski, K; Cohen, J D

2007-08-15T23:59:59.000Z

197

Burn site groundwater interim measures work plan.  

SciTech Connect (OSTI)

This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

2005-05-01T23:59:59.000Z

198

Save Energy Now Assessments Results 2008 Detailed Report  

SciTech Connect (OSTI)

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy No

Wright, Anthony L [ORNL; Martin, Michaela A [ORNL; Nimbalkar, Sachin U [ORNL; Quinn, James [U.S. Department of Energy; Glatt, Ms. Sandy [DOE Industrial Technologies Program; Orthwein, Mr. Bill [U.S. Department of Energy

2010-09-01T23:59:59.000Z

199

65 Contingency Planning Issues CONTINGENCY PLANNING ISSUES  

E-Print Network [OSTI]

. The plan relies on a mixed strategy response to an energy shortage. The plan uses a free market approach to local jurisdic- tions, economic considerations, revisions to the California Energy Shortage Contingency multiple jurisdictions or agencies. LOCAL GOVERNMENT ASSISTANCE PROGRAM The purpose of the Energy

200

EMIS Quick User Guide Search page (details on page 2)  

E-Print Network [OSTI]

search terms in foreign languages You can enter search terms in foreign languages by: - Using your: Please note that we have a Cyrillic and Arabic keyboards available through the Search page. EnteringEMIS Quick User Guide Search page (details on page 2) The News page: Access the latest news

Barthelat, Francois

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Detailed Information on Proposal for US-Monbusho Collaoration  

E-Print Network [OSTI]

C / He /Ceramic Breeder / Be material system - Key: Measure interface thermal resistance at the Si be significant (T-breeding) · Beryllium (typically): Tmax thermal resistance between ceramicDetailed Information on Proposal for UNICEX-Hi US-Monbusho Collaoration Thermal

Abdou, Mohamed

202

Baca geothermal demonstration project. Power plant detail design document  

SciTech Connect (OSTI)

This Baca Geothermal Demonstration Power Plant document presents the design criteria and detail design for power plant equipment and systems, as well as discussing the rationale used to arrive at the design. Where applicable, results of in-house evaluations of alternatives are presented.

Not Available

1981-02-01T23:59:59.000Z

203

Non-Traditional Business Plan - Developing Sustainable Programs Related to Entrepreneurial Opportunities within a Government Contractor  

E-Print Network [OSTI]

to be used in creating a strategic plan. Strategic Plan Aerospace Plant H has a detailed strategic plan that is updated annually to reflect any changes to the business. It is the objective of this section to augment the existing strategic plan... and scientists engaged in the latest technologies. The Plant created a business development department that looked at creating partnerships with other government agencies, other industries, and universities to utilize our manufacturing prowess to help define...

Helm, William A.

2007-12-14T23:59:59.000Z

204

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

Kosecka, Jana

205

Virginia Energy Plan (Virginia)  

Broader source: Energy.gov [DOE]

The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the states energy picture through an examination of the states primary energy...

206

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

207

Sustainabiliity Sustainability Plan  

E-Print Network [OSTI]

Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

Heller, Barbara

208

Hoisting & Rigging Lift Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 3 of 3 Guidelines for Generating a Rigging Sketch The lift plan required a rigging sketch or...

209

Training Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

210

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

211

Business Planning Resources  

Broader source: Energy.gov [DOE]

Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

212

Greensburg Sustainable Comprehensive Plan  

High Performance Buildings Database

Greensburg, KS In October 2007, the architectural and planning firm, BNIM, was selected formally by the City of Greensburg, with support from the USDA, to prepare the first phase of a comprehensive master plan to rebuild the city, which provides a framework for the rebuilding of Greensburg based around the principles of economic, social and environmental sustainability. The BNIM Planning team presented the final draft of Greensburg's Comprehensive Plan to the City Council and to a public hearing on January 16, 2008.

213

Reducing Ultra-Clean Transportation Fuel Costs with HyMelt Hydrogen  

SciTech Connect (OSTI)

This report describes activities for the second quarter of work performed under this agreement. Kick off meetings with MEFOS, Kvarner and Siemens Westinghouse were held during the reporting period. MEFOS and Kvaerner have completed initial computational simulations. MEFOS has drafted a detailed experimental test plan and is making preparations for atmospheric testing, scheduled to begin on June 5.

Donald P. Malone; William R. Renner

2003-04-30T23:59:59.000Z

214

Multiperiod Refinery Planning Optimization  

E-Print Network [OSTI]

Multiperiod Refinery Planning Optimization with Nonlinear CDU Models Abdulrahman Alattas, Advisor #12;Refinery Planning Model Development 2 Extension to Multiperiod Planning #12;3 Multiperiod Refinery: refinery configuration Determine · What crude oil to process and in which time period? · The quantities

Grossmann, Ignacio E.

215

University Libraries Technology Plan  

E-Print Network [OSTI]

Libraries Bowling Green State University #12;Table of Contents Introduction ..................................................................19 Page 2 of 19 Technology Plan, 2003-2005 University Libraries Bowling Green State University #12University Libraries Technology Plan 2003-2005 Page 1 of 19 Technology Plan, 2003-2005 University

Moore, Paul A.

216

University of Operations Plan  

E-Print Network [OSTI]

Management Plan Office of Campus and Public Safety University of Delaware Critical Incident Management Plan Management Plan Office of Campus and Public Safety - 4 - University of Delaware Critical Incident Management and Public Safety - 5 - County of New Castle CD-30 911 Center/Communications CD-31 Department of Police CD-32

Firestone, Jeremy

217

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

Kosecka, Jana

218

Corporate and Business Plan  

E-Print Network [OSTI]

Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

219

Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)  

SciTech Connect (OSTI)

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

2014-01-01T23:59:59.000Z

220

Towards a detailed soot model for internal combustion engines  

SciTech Connect (OSTI)

In this work, we present a detailed model for the formation of soot in internal combustion engines describing not only bulk quantities such as soot mass, number density, volume fraction, and surface area but also the morphology and chemical composition of soot aggregates. The new model is based on the Stochastic Reactor Model (SRM) engine code, which uses detailed chemistry and takes into account convective heat transfer and turbulent mixing, and the soot formation is accounted for by SWEEP, a population balance solver based on a Monte Carlo method. In order to couple the gas-phase to the particulate phase, a detailed chemical kinetic mechanism describing the combustion of Primary Reference Fuels (PRFs) is extended to include small Polycyclic Aromatic Hydrocarbons (PAHs) such as pyrene, which function as soot precursor species for particle inception in the soot model. Apart from providing averaged quantities as functions of crank angle like soot mass, volume fraction, aggregate diameter, and the number of primary particles per aggregate for example, the integrated model also gives detailed information such as aggregate and primary particle size distribution functions. In addition, specifics about aggregate structure and composition, including C/H ratio and PAH ring count distributions, and images similar to those produced with Transmission Electron Microscopes (TEMs), can be obtained. The new model is applied to simulate an n-heptane fuelled Homogeneous Charge Compression Ignition (HCCI) engine which is operated at an equivalence ratio of 1.93. In-cylinder pressure and heat release predictions show satisfactory agreement with measurements. Furthermore, simulated aggregate size distributions as well as their time evolution are found to qualitatively agree with those obtained experimentally through snatch sampling. It is also observed both in the experiment as well as in the simulation that aggregates in the trapped residual gases play a vital role in the soot formation process. (author)

Mosbach, Sebastian; Celnik, Matthew S.; Raj, Abhijeet; Kraft, Markus [Department of Chemical Engineering and Biotechnology, University of Cambridge, Pembroke Street, Cambridge CB2 3RA (United Kingdom); Zhang, Hongzhi R. [Department of Chemical Engineering, University of Utah, 1495 East 100 South, Kennecott Research Building, Salt Lake City, UT 84112 (United States); Kubo, Shuichi [Frontier Research Center, Toyota Central R and D Labs., Inc., Nagakute, Aichi 480-1192 (Japan); Kim, Kyoung-Oh [Higashifuji Technical Center, Toyota Motor Corporation, Mishuku 1200, Susono, Shizuoka 480-1193 (Japan)

2009-06-15T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

Herbinet, O; Pitz, W J; Westbrook, C K

2007-09-20T23:59:59.000Z

222

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran et al. for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO2 production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels.

Herbinet, O; Pitz, W J; Westbrook, C K

2007-09-17T23:59:59.000Z

223

Detailed chemical kinetic oxidation mechanism for a biodiesel surrogate  

SciTech Connect (OSTI)

A detailed chemical kinetic mechanism has been developed and used to study the oxidation of methyl decanoate, a surrogate for biodiesel fuels. This model has been built by following the rules established by Curran and co-workers for the oxidation of n-heptane and it includes all the reactions known to be pertinent to both low and high temperatures. Computed results have been compared with methyl decanoate experiments in an engine and oxidation of rapeseed oil methyl esters in a jet-stirred reactor. An important feature of this mechanism is its ability to reproduce the early formation of carbon dioxide that is unique to biofuels and due to the presence of the ester group in the reactant. The model also predicts ignition delay times and OH profiles very close to observed values in shock tube experiments fueled by n-decane. These model capabilities indicate that large n-alkanes can be good surrogates for large methyl esters and biodiesel fuels to predict overall reactivity, but some kinetic details, including early CO{sub 2} production from biodiesel fuels, can be predicted only by a detailed kinetic mechanism for a true methyl ester fuel. The present methyl decanoate mechanism provides a realistic kinetic tool for simulation of biodiesel fuels. (author)

Herbinet, Olivier; Pitz, William J.; Westbrook, Charles K. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States)

2008-08-15T23:59:59.000Z

224

Business Plans for Agricultural Producers  

E-Print Network [OSTI]

Natural resources Z Strengths, weaknesses, opportunities ? and threats (SWOT) Mission statement ? Objectives and goals ? Production plan ? Financial plan ? Market plan ? Legal and liability issues ? Insurance ? Succession and estate planning...

McCorkle, Dean; Bevers, Stan

2008-10-17T23:59:59.000Z

225

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings  

SciTech Connect (OSTI)

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.

NONE

1995-09-01T23:59:59.000Z

226

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

227

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

228

High performance computing and communications: FY 1996 implementation plan  

SciTech Connect (OSTI)

The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

NONE

1995-05-16T23:59:59.000Z

229

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

230

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

231

General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1  

SciTech Connect (OSTI)

This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

Moreno, S.R.

1995-09-01T23:59:59.000Z

232

Detailed balance limit of power conversion efficiency for organic photovoltaics  

SciTech Connect (OSTI)

A fundamental difference between inorganic photovoltaic (IPV) and organic photovoltaic (OPV) cells is that charges are generated at the interface in OPV cells, while free charges can be generated in the bulk in IPV cells. In OPV cells, charge generation involves intrinsic energy losses to dissociate excitons at the interface between the donor and acceptor. By taking into account the energy losses, we show the theoretical limits of the power conversion efficiency set by radiative recombination of the carriers on the basis of the detailed balance relation between radiation from the cell and black-body radiation.

Seki, Kazuhiko, E-mail: k-seki@aist.go.jp [NRI, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)] [NRI, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan); Furube, Akihiro [RIIF, AIST Tsukuba Central 2, Umezono 1-1-1, Tsukuba, Ibaraki 305-8568 (Japan)] [RIIF, AIST Tsukuba Central 2, Umezono 1-1-1, Tsukuba, Ibaraki 305-8568 (Japan); Yoshida, Yuji [RCPVT, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)] [RCPVT, National Institute of Advanced Industrial Science and Technology (AIST), AIST Tsukuba Central 5, Higashi 1-1-1, Tsukuba, Ibaraki 305-8565 (Japan)

2013-12-16T23:59:59.000Z

233

Detailed Chemical Analysis of Two Giants in the SGR DSPH  

E-Print Network [OSTI]

The 8m class telescopes allow for the first time to study stars of external galaxies with the same resolution and S/N ratio which has been so far used for Galactic stars. It is quite likely that this study will shake some of our current beliefs. In this poster we highlight some of the results which have been obtained for two giants in the Sgr dSph thanks to the UVES spectrograph on the ESO 8.2m Kueyen telescope. Further details on the observations and data analysis may be found in Bonifacio et al (2000).

P. Bonifacio; P. Molaro

2001-01-23T23:59:59.000Z

234

Detail Shot Of Mira | Argonne Leadership Computing Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density, andagingabout InfluenzaDetail Shot Of

235

Detailed Characterization of Particulates Emitted by Pre-Commercial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape, Density, andagingabout InfluenzaDetail Shot

236

New Measurement Explores Fine Details of Proton Structure | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andDataNational Library of1,DepartmentMeasurement Explores Fine Details

237

Buildings and Energy in the 80's -- Detailed Tables  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import CostsLiquidsYearReserves (Billion5:July 22, 20131Detailed

238

Electric Utility Sales and Revenue - EIA-826 detailed data file  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecember 2005 (Thousand9,0, 1997Environment > Voluntary826 detailed data The Form

239

Blundell 2 Power Plant Details | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: Energy ResourcesJersey:formBlue Energy Address:Bluestem Electric CoopDetails

240

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layeredof Energy Two CompaniesTwo Studies Reveal Details of

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Two Studies Reveal Details of Lithium-Battery Function  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layeredof Energy Two CompaniesTwo Studies Reveal Details ofTwo

242

Atomistic Details of the Associative Phosphodiester Cleavage in Human  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone byDear Friend,ArthurMaterialsRibonuclease H. | EMSL Details

243

Sandia National Laboratories: 2014 PV Systems Symposium Details  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwardsSafeguards andSan$0.06 per09Engineer AwardDetails

244

Task analysis: a detailed example of stepping up from JSA  

SciTech Connect (OSTI)

This paper discusses a pilot task analysis of operations in a proposed facility for the cutting and packaging of radioactively contaminated gloveboxes, for long-term storage or burial. The objective was to demonstrate how task analysis may be used as a tool for planning and risk management. Two specific products were generated - preliminary operating procedures and training requirements. The task data base, procedures list and training requirements developed were intended as first order categorizations. The analysis was limited to tasks that will be performed within the boundaries of the operational facility and the associated load-out area. The analysis documents tasks to be performed by D and D (Decontamination and Decommissioning) Workers. However, the analysis included all tasks identified as an integral part of glovebox processing within the facility. Thus tasks involving Radiation Protection Technicians (RPTs) are included. Based on hazard assessments, it is planned that at least two RPTs will be assigned full-time to the facility, so they may be considered part of its crew. Similarly, supervisory/administrative tasks are included where they were determined to be directly part of process sequences, such as obtaining appropriate certification. 11 tables.

Banks, W.W.; Paramore, B.A.; Buys, J.R.

1984-10-01T23:59:59.000Z

245

Detailed Physical Trough Model for NREL's Solar Advisor Model: Preprint  

SciTech Connect (OSTI)

Solar Advisor Model (SAM) is a free software package made available by the National Renewable Energy Laboratory (NREL), Sandia National Laboratory, and the US Department of Energy. SAM contains hourly system performance and economic models for concentrating solar power (CSP) systems, photovoltaic, solar hot-water, and generic fuel-use technologies. Versions of SAM prior to 2010 included only the parabolic trough model based on Excelergy. This model uses top-level empirical performance curves to characterize plant behavior, and thus is limited in predictive capability for new technologies or component configurations. To address this and other functionality challenges, a new trough model; derived from physical first principles was commissioned to supplement the Excelergy-based empirical model. This new 'physical model' approaches the task of characterizing the performance of the whole parabolic trough plant by replacing empirical curve-fit relationships with more detailed calculations where practical. The resulting model matches the annual performance of the SAM empirical model (which has been previously verified with plant data) while maintaining run-times compatible with parametric analysis, adding additional flexibility in modeled system configurations, and providing more detailed performance calculations in the solar field, power block, piping, and storage subsystems.

Wagner, M. J.; Blair, N.; Dobos, A.

2010-10-01T23:59:59.000Z

246

Detailed computation of hot-plasma atomic spectra  

E-Print Network [OSTI]

We present recent evolutions of the detailed opacity code SCO-RCG which combines statistical modelings of levels and lines with fine-structure calculations. The code now includes the Partially-Resolved-Transition-Array model, which allows one to replace a complex transition array by a small-scale detailed calculation preserving energy and variance of the genuine transition array and yielding improved high-order moments. An approximate method for studying the impact of strong magnetic field on opacity and emissivity was also recently implemented. The Zeeman line profile is modeled by fourth-order Gram-Charlier expansion series, which is a Gaussian multiplied by a linear combination of Hermite polynomials. Electron collisional line broadening is often modeled by a Lorentzian function and one has to calculate the convolution of a Lorentzian with Gram-Charlier distribution for a huge number of spectral lines. Since the numerical cost of the direct convolution would be prohibitive, we propose, in order to obtain t...

Pain, Jean-Christophe; Blenski, Thomas

2015-01-01T23:59:59.000Z

247

A DETAILED RESEARCH PLAN TO ASSESS BEHAVIOR OF ADULT SUMMER/FALL CHINOOK UPSTREAM OF WELLS DAM USING  

E-Print Network [OSTI]

........................................................................ 11 3.6.3 Chief Joseph Dam Powerhouse

248

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

249

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

NONE

2006-09-01T23:59:59.000Z

250

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 300: SURFACE RELEASE AREAS NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 300 CADD.

NONE

2006-07-01T23:59:59.000Z

251

What can I do with this degree? Tax Planning and Compliance  

E-Print Network [OSTI]

What can I do with this degree? BUSINESS ACCOUNTING Tax Planning and Compliance Auditing energy level and detail orientation. Publicaccountingfirms Governmentagencies Banks and other financial--primary,secondary schools, colleges or private schools Financialinstitutions Trade/labor organizations Governmentagencies

Escher, Christine

252

FY 1987 current fiscal year work plan  

SciTech Connect (OSTI)

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

253

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

254

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

255

Individual Development Plan  

Broader source: Energy.gov [DOE]

To be effective, training decisions made at the organizational and departmental levels must be informed by the needs of the individual. An individual development plan (IDP) is cooperatively...

256

Microsoft Word - prjct planning  

Broader source: Energy.gov (indexed) [DOE]

activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies,...

257

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

258

Community Relations Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public...

259

Climate Action Plan (Virginia)  

Broader source: Energy.gov [DOE]

Governor Timothy M. Kaine established the Governor's Commission on Climate Change in December 2007. The commission prepared a plan for Virginia that identified ways to reduce greenhouse gas...

260

Climate Action Plan (Kentucky)  

Broader source: Energy.gov [DOE]

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

262

Planning guidance for the Chemical Stockpile Emergency Preparedness Program  

SciTech Connect (OSTI)

This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

1995-02-01T23:59:59.000Z

263

A detailed spectroscopic study of an Italian fresco  

SciTech Connect (OSTI)

In the present work we characterized samples of plasters and pictorial layers taken from a fresco in the Acireale Cathedral. The fresco represents the Coronation of Saint Venera, patron saint of this Ionian town. By performing a detailed spectroscopic analysis of the plaster preparation layer by Fourier-transform infrared (FTIR) spectroscopy and x-ray diffraction (XRD), and of the painting layer by FTIR and confocal Raman microspectroscopy, scanning electron microscopy+energy dispersive x-ray spectroscopy, and XRD, we were able to identify the pigments and the binders present. In particular, Raman investigation was crucial to the characterization of the pigments thanks to the high resolution of the confocal apparatus used. It is worth stressing that the simultaneous use of complementary techniques was able to provide more complete information for the conservation of the artifact we studied.

Barilaro, Donatella; Crupi, Vincenza; Majolino, Domenico; Barone, Germana; Ponterio, Rosina [Dipartimento di Fisica and Instituto Nazionale per la Fisica della Materia (INFM), Universita di Messina, Contrada Papardo, Salita Sperone 31, P.O. Box 55, 98166 Messina (Italy); Dipartimento di Scienze dalla Terra, Universita di Messina, Contrada Papardo, Salita Sperone 31, P.O. Box 55, 98166 Messina (Italy); Istituto per i Processi Chimico-Fisici del Consiglio Nazionale delle Ricerche-Istituto per i Processi Chimico Fisici (CNR-IPCF), Sezione di Messina, Via La Farina 237, 98123 Messina (Italy)

2005-02-15T23:59:59.000Z

264

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

265

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

266

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

267

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

268

Hanford facility contingency plan  

SciTech Connect (OSTI)

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

269

Supporting Document Strategic Plan  

E-Print Network [OSTI]

1 Supporting Document Strategic Plan 20132020 #12;2 Supporting Document Strategic Plan 2013 more critical to the University's future than was the case in 2005. The purpose of this document are summarised via a SWOT analysis in Appendix 1. This document should therefore be read in conjunction

Auckland, University of

270

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

Tu, Linh

2006-12-15T23:59:59.000Z

271

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

272

South Texas Planning Region Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

South Texas Development Council Economic Development Program

2006-12-15T23:59:59.000Z

273

Lawrence Berkeley Laboratory Institutional Plan FY 1995--2000  

SciTech Connect (OSTI)

This report presents the details of the mission and strategic plan for Lawrence Berkeley Laboratory during the fiscal years of 1995--2000. It presents summaries of current programs and potential changes; critical success factors such as human resources; management practices; budgetary allowances; and technical and administrative initiatives.

NONE

1994-12-01T23:59:59.000Z

274

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN  

E-Print Network [OSTI]

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

Florida, University of

275

Energy Efficiency Market Sustainable Business Planning | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

276

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

277

GRB 050822: Detailed analysis of an XRF observed by Swift  

E-Print Network [OSTI]

We report on the temporal and spectral characteristics of the early X-ray emission from the GRB 050822 as observed by Swift. This burst is likely to be an XRF showing major X-ray flares in its XRT light-curve. The quality of the data allows a detailed spectral analysis of the early afterglow in the X-ray band. During the X-ray flares, a positive correlation between the count rate and the spectral hardness (i.e. higher the count rate is and harder the spectrum is) is clearly seen for the X-ray flares. This behaviour similar to that seen for Gamma-ray pulses indicates that the energy peak of the spectrum is in the XRT energy band and it moves at lower energy with time. We show evidence for the possible detection of the emergence of the forward-shock emission produced at a radius larger than 4 x 10^{16} cm (a forming region clearly different to that producing the prompt emission). Finally, we show that the null detection of a jet break up to T_0+4 x 10^6s in the X-ray light curve of this XRF can be understood: i...

Godet, O; Osborne, J; Zhang, B; Burrows, D N; O'Brien, P T; Hill, J E; Racusin, J; Beardmore, A P; Goad, M R; Falcone, A; Morris, D C; Ziaeepour, H

2007-01-01T23:59:59.000Z

278

A detail study of defect models for cosmic structure formation  

E-Print Network [OSTI]

We calculate predictions from wide class of `active' models of cosmic structure formation which allows us to scan the space of possible defect models. We calculate the linear cold dark matter power spectrum and Cosmic Microwave Background (CMB) anisotropies over all observable scales using a full linear Einstein-Boltzmann code. Our main result, which has already been reported, points to a serious problem reconciling the observed amplitude of the large-scale galaxy distribution with the COBE normalization. Here, we describe our methods and results in detail. The problem is present for a wide range of defect parameters, which can be used to represent potential differences among defect models, as well as possible systematic numerical errors. We explicitly examine the impact of varying the defect model parameters and we show how the results substantiate these conclusions. The standard scaling defect models are in serious conflict with the current data, and we show how attempts to resolve the problem by considering non-scaling defects or modified stress-energy components would require radical departures from what has become the standard picture.

A. Albrecht; R. A. Battye; J. Robinson

1997-11-27T23:59:59.000Z

279

Evolution Effects on Parton Energy Loss with Detailed Balance  

E-Print Network [OSTI]

The initial conditions in the chemical non-equilibrated medium and Bjorken expanding medium at RHIC are determined. With a set of rate equations describing the chemical equilibration of quarks and gluons based on perturbative QCD, we investigate the consequence for parton evolution at RHIC. With considering parton evolution, it is shown that the Debye screening mass and the inverse mean free-path of gluons reduce with increasing proper time in the QGP medium. The parton evolution affects the parton energy loss with detailed balance, both parton energy loss from stimulated emission in the chemical non-equilibrated expanding medium and in Bjorken expanding medium are linear dependent on the propagating distance rather than square dependent in the static medium. The energy absorption can not be neglected at intermediate jet energies and small propagating distance of the energetic parton in contrast with that it is important only at intermediate jet energy in the static medium. This will increase the energy and propagating distance dependence of the parton energy loss and will affect the shape of suppression of moderately high P_T hadron spectra.

Luan cheng; Enke Wang

2010-04-30T23:59:59.000Z

280

Flow Effects on Jet Energy Loss with Detailed Balance  

E-Print Network [OSTI]

In the presence of collective flow a new model potential describing the interaction of the hard jet with scattering centers is derived based on the static color-screened Yukawa potential. The flow effect on jet quenching with detailed balance is investigated in pQCD. It turns out, considering the collective flow with velocity $v_z$ along the jet direction, the collective flow decreases the LPM destructive interference comparing to that in the static medium. The gluon absorption plays a more important role in the moving medium. The collective flow increases the energy gain from gluon absorption, however, decreases the energy loss from gluon radiation, which is $(1 - v_z )$ times as that in the static medium to the first order of opacity. In the presence of collective flow, the second order in opacity correction is relatively small compared to the first order. So that the total effective energy loss is decreased. The flow dependence of the energy loss will affect the suppression of high $p_T$ hadron spectrum and anisotropy parameter $v_2$ in high-energy heavy-ion collisions.

Luan Cheng; Jia Liu; Enke Wang

2014-06-03T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Detailed model for practical pulverized coal furnaces and gasifiers  

SciTech Connect (OSTI)

The need to improve efficiency and reduce pollutant emissions commercial furnaces has prompted energy companies to search for optimized operating conditions and improved designs in their fossil-fuel burning facilities. Historically, companies have relied on the use of empirical correlations and pilot-plant data to make decisions about operating conditions and design changes. The high cost of collecting data makes obtaining large amounts of data infeasible. The main objective of the data book is to provide a single source of detailed three-dimensional combustion and combustion-related data suitable for comprehensive combustion model evaluation. Five tasks were identified as requirements to achieve the main objective. First, identify the types of data needed to evaluate comprehensive combustion models, and establish criteria for selecting the data. Second, identify and document available three-dimensional combustion data related to pulverized coal combustion. Third, collect and evaluate three-dimensional data cases, and select suitable cases based on selection criteria. Fourth, organize the data sets into an easy-to-use format. Fifth, evaluate and interpret the nature and quality of the data base. 39 refs., 15 figs., 14 tabs.

Philips, S.D.; Smoot, L.D.

1989-08-01T23:59:59.000Z

282

Project W-314 Specific Test and Evaluation Plan 241-AN-A Valve Pit  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

HAMMERS, J.S.

1999-08-25T23:59:59.000Z

283

SNL/CA Environmental Planning and Ecology Program Annual Report 2007.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2007-02-01T23:59:59.000Z

284

SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2005-05-01T23:59:59.000Z

285

Public affairs plan  

SciTech Connect (OSTI)

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

Not Available

1994-09-01T23:59:59.000Z

286

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

287

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

288

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

289

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

290

Site Support Program Plan Infrastructure Program  

SciTech Connect (OSTI)

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

291

Enabling Detailed Energy Analyses via the Technology Performance Exchange: Preprint  

SciTech Connect (OSTI)

One of the key tenets to increasing adoption of energy efficiency solutions in the built environment is improving confidence in energy performance. Current industry practices make extensive use of predictive modeling, often via the use of sophisticated hourly or sub-hourly energy simulation programs, to account for site-specific parameters (e.g., climate zone, hours of operation, and space type) and arrive at a performance estimate. While such methods are highly precise, they invariably provide less than ideal accuracy due to a lack of high-quality, foundational energy performance input data. The Technology Performance Exchange was constructed to allow the transparent sharing of foundational, product-specific energy performance data, and leverages significant, external engineering efforts and a modular architecture to efficiently identify and codify the minimum information necessary to accurately predict product energy performance. This strongly-typed database resource represents a novel solution to a difficult and established problem. One of the most exciting benefits is the way in which the Technology Performance Exchange's application programming interface has been leveraged to integrate contributed foundational data into the Building Component Library. Via a series of scripts, data is automatically translated and parsed into the Building Component Library in a format that is immediately usable to the energy modeling community. This paper (1) presents a high-level overview of the project drivers and the structure of the Technology Performance Exchange; (2) offers a detailed examination of how technologies are incorporated and translated into powerful energy modeling code snippets; and (3) examines several benefits of this robust workflow.

Studer, D.; Fleming, K.; Lee, E.; Livingood, W.

2014-08-01T23:59:59.000Z

292

Fort Drum integrated resource assessment. Volume 2, Baseline detail  

SciTech Connect (OSTI)

The US Army Forces Command (FORSCOM) has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Fort Drum. This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company. It will identify and evaluate all electric and fossil fuel cost-effective energy projects; develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, the FORSCOM Fort Drum facility located near Watertown, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Resource Assessment. This analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. It records energy-use intensities for the facilities at Fort Drum by building type and energy end use. It also breaks down building energy consumption by fuel type, energy end use, and building type. A complete energy consumption reconciliation is presented that includes the accounting of all energy use among buildings, utilities, central systems, and applicable losses.

Dixon, D.R.; Armstrong, P.R.; Brodrick, J.R.; Daellenbach, K.K.; Di Massa, F.V.; Keller, J.M.; Richman, E.E.; Sullivan, G.P.; Wahlstrom, R.R.

1992-12-01T23:59:59.000Z

293

Development of Detailed Kinetic Models for Fischer-Tropsch Fuels  

SciTech Connect (OSTI)

Fischer-Tropsch (FT) fuels can be synthesized from a syngas stream generated by the gasification of biomass. As such they have the potential to be a renewable hydrocarbon fuel with many desirable properties. However, both the chemical and physical properties are somewhat different from the petroleum-based hydrocarbons that they might replace, and it is important to account for such differences when considering using them as replacements for conventional fuels in devices such as diesel engines and gas turbines. FT fuels generally contain iso-alkanes with one or two substituted methyl groups to meet the pour-point specifications. Although models have been developed for smaller branched alkanes such as isooctane, additional efforts are required to properly capture the kinetics of the larger branched alkanes. Recently, Westbrook et al. developed a chemical kinetic model that can be used to represent the entire series of n-alkanes from C{sub 1} to C{sub 16} (Figure 1). In the current work, the model is extended to treat 2,2,4,4,6,8,8-heptamethylnonane (HMN), a large iso-alkane. The same reaction rate rules used in the iso-octane mechanism were incorporated in the HMN mechanism. Both high and low temperature chemistry was included so that the chemical kinetic model would be applicable to advanced internal combustion engines using low temperature combustion strategies. The chemical kinetic model consists of 1114 species and 4468 reactions. Concurrently with this effort, work is underway to improve the details of specific reaction classes in the mechanism, guided by high-level electronic structure calculations. Attention is focused upon development of accurate rate rules for abstraction of the tertiary hydrogens present in branched alkanes and properly accounting for the pressure dependence of the ?-scission, isomerization, and R + O{sub 2} reactions.

Westbrook, C K; Pitz, W J; Carstensen, H; Dean, A M

2008-10-28T23:59:59.000Z

294

Griffiss AFB integrated resource assessment. Volume 2, Electric baseline detail  

SciTech Connect (OSTI)

The US Air Force Air Combat Command has tasked the Pacific Northwest Laboratory (PNL) as the lead laboratory supporting the US Department of Energy (DOE) Federal Energy Management Program`s (FEMP) mission to identify, evaluate, and assist in acquiring all cost-effective energy projects at Griffiss Air Force Base (AFB). This is a model program PNL is designing for federal customers served by the Niagara Mohawk Power Company (Niagara Mohawk). It will (1) identify and evaluate all electric cost-effective energy projects; (2) develop a schedule at each installation for project acquisition considering project type, size, timing, and capital requirements, as well as energy and dollar savings; and (3) secure 100% of the financing required to implement electric energy efficiency projects from Niagara Mohawk and have Niagara Mohawk procure the necessary contractors to perform detailed audits and install the technologies. This report documents the assessment of baseline energy use at one of Niagara Mohawk`s primary federal facilities, Griffiss AFB, an Air Combat Command facility located near Rome, New York. It is a companion report to Volume 1, the Executive Summary, and Volume 3, the Electric Resource Assessment. The analysis examines the characteristics of electric, gas, oil, propane, coal, and purchased thermal capacity use for fiscal year (FY) 1990. The results include energy-use intensities for the facilities at Griffiss AFB by building type and electric energy end use. A complete electric energy consumption reconciliation is presented that accounts for the distribution of all major electric energy uses and losses among buildings, utilities, and central systems.

Dixon, D.R.; Armstrong, P.R.; Keller, J.M.

1993-02-01T23:59:59.000Z

295

Institutional plan FY 1998--FY 2003  

SciTech Connect (OSTI)

The Institutional Plan has been rearranged this year as a reflection of new Department of Energy (DOE) guidelines and to better illustrate the Laboratory`s mission-oriented focus. In Section 1 of this plan, the authors set forth their vision, mission, core competencies, strategic view, and related material. This section illustrates integration with the vision, mission, priorities, and core businesses of DOE. They define strategies, tactics, and guidelines and describe how they measure progress. In Section 2, they have elaborated on how they plan to address the Laboratory`s mission, describing programs and activities in the context of their role in this mission. Section 3 contains information on their approach to managing their business and operations. First they address the most critical issue safety. In this section, they confirm that Los Alamos is addressing the DOE critical success factors and describe the initiatives and plans that make their mission successful and leads them toward their vision. Section 4 contains details of their resources. 44 figs., 56 tabs.

NONE

1997-10-01T23:59:59.000Z

296

ICDF Complex Remedial Action Work Plan  

SciTech Connect (OSTI)

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

297

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning  

E-Print Network [OSTI]

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

Ferguson, George

298

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

299

Developing a Marketing Plan  

E-Print Network [OSTI]

Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

2009-03-02T23:59:59.000Z

300

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Rukmana, Deden. Street Vendors and Planning in IndonesianYatmo, Yandi Andri. Street Vendors as 'Out of Place' UrbanYatmo, Yandi Andri. Street Vendors as 'Out of Place' Urban

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

CURRICULUM VITAE RESEARCH PLAN  

E-Print Network [OSTI]

CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

Sørensen, Erik S.

302

Constraints and AI Planning  

E-Print Network [OSTI]

Tackling real-world problems often requires to take various types of constraints into account. Such constraint types range from simple numerical comparators to complex resources. This article describes how planning techniques ...

Nareyek, A; Freuder, E C; Fourer, R; Giunchiglia, R P; Kautz, H; Rintanen, J; Tate, Austin

2005-01-01T23:59:59.000Z

303

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

304

Business Entity Planning  

E-Print Network [OSTI]

There are a number of ways farm and ranch businesses can be structured, including partnerships, corporations, limited liability companies, and others. This publication explains how the structure of a business affects estate planning, management...

Thompson, Bill; Hayenga, Wayne

2008-10-10T23:59:59.000Z

305

Planning a Prescribed Burn  

E-Print Network [OSTI]

This leaflet explains how to plan for adequate fuel for a prescribed burn, control the fire, notify the proper authority, manage the burn itself, and conduct follow-up management. A ranch checklist for prescribed burning is included....

Hanselka, C. Wayne

2009-04-01T23:59:59.000Z

306

Technical Planning Basis  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

2007-07-11T23:59:59.000Z

307

Climate Action Plan (Maine)  

Broader source: Energy.gov [DOE]

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

308

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

309

Europeans plans their next big source  

SciTech Connect (OSTI)

European neutron-scattering researchers announced the next step in plans to build the world`s most powerful pulsed-neutron source by 2010. A just released three year technical study detailed the technical specifications for the new machine, and the five partner institutions agreed to seek funding for a 3-year research and development phase to prove the concept. This article goes on to discuss the possibilities and the future for the European Spallation Source (ESS) neutron facility, and well as the funding problems.

Hellemans, A.

1997-05-09T23:59:59.000Z

310

Appendix 3-3-The complete model formulation for detailed multiple release software product simulation model  

E-Print Network [OSTI]

simulation model In this appendix the model formulations for the detailed simulation model (discussed

Rahmandad, Hazhir

311

Environmental implementation plan  

SciTech Connect (OSTI)

In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

Peterson, G.L.

1994-10-04T23:59:59.000Z

312

Metropolitan Transportation Plan 2035  

E-Print Network [OSTI]

Adopted by the Tyler Area MPO Policy Committee December 4, 2009 METROPOLITAN TRANSPORTATION PLAN 2035 Revised April 22, 2010 Adopted by the Tyler Area MPO Policy Committee December 4, 2009 Amended/Revised April 22, 2010 Prepared by: Bucher..., Willis, and Ratliff Corporation 1828 East Southeast Loop 323, Suite 202 Tyler, Texas 75701 903.581.7844 This Document Serves as an Update to the Tyler Area Metropolitan Transportation Plan 2030. Portions of that Document were Unchanged and Appear...

Tyler Area Metropolitan Planning Organization

2009-12-04T23:59:59.000Z

313

Public affairs plan  

SciTech Connect (OSTI)

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

NONE

1995-09-01T23:59:59.000Z

314

Hot Springs Metropolitan Planning Organization 2030 Long Range Transportation Plan  

E-Print Network [OSTI]

Hot Springs Area Metropolitan Planning Organization 100 Broadway Terrace Hot Springs, Arkansas 71901 Adopted November 3, 2005 HSA-MPO 2030 LRTPii Participating Agencies Garland County Hot... Federal Highway Administration Federal Transit Administration 2030 Long Range Transportation Plan for the Hot Springs Area Metropolitan Planning Organization This LRTP has been funded with federal Metropolitan Planning (PL) funds through...

Hot Springs Metropolitan Planning Organization

2005-11-03T23:59:59.000Z

315

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

316

OSU Bicycle Plan 2/10 OSU Bicycle Plan  

E-Print Network [OSTI]

OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

Escher, Christine

317

Rulison Monitoring Plan  

SciTech Connect (OSTI)

The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

None

2010-07-01T23:59:59.000Z

318

Licensing plan for UMTRA project disposal sites. Final [report  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC`s acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information.

Not Available

1993-09-01T23:59:59.000Z

319

FORMALDEHYDE Formaldehyde Management Plan i  

E-Print Network [OSTI]

and Evaluation) Facilities Management Work Control Center (40)5-2222 (Repair of Facility Equipment DeficienciesFORMALDEHYDE MANAGEMENT PLAN #12;Formaldehyde Management Plan i Review and Approval Authority Formaldehyde Management Plan this page intentionally blank #12;Formaldehyde Management Plan iii Table

Rubloff, Gary W.

320

Forestry Commission England Corporate Plan  

E-Print Network [OSTI]

Forestry Commission England Corporate Plan 2011-15 This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. Page 1Forestry Commission England Corporate Plan 2011-15 #12;Page 2Forestry Commission England

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

322

UNL CAMPUS & LANDSCAPE MASTER PLANS  

E-Print Network [OSTI]

are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

Farritor, Shane

323

Optimal Interdiction of Attack Plans Joshua Letchford  

E-Print Network [OSTI]

Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

Vorobeychik, Eugene

324

Contact Details of Local Forestry Commission and DARDNI Plant Health Inspectors at Points of Entry UK Principle Ports Inspector Contact Details  

E-Print Network [OSTI]

UK Principle Ports Inspector Contact Details Grangemouth, Greenock, Inverkeithing, Inverness, Leith, Barry, Port Talbot, Swansea, Neath, Newport, Bristol(Avonmouth), Sharpness Sid Martin Tel/Fax: 01792

325

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

326

Optimal Model-Based Production Planning  

E-Print Network [OSTI]

1 Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor;2 Outline Introduction Problem Statement Refinery Planning Model Development LP Planning Models NLP Planning Models Conclusion #12;3 Introduction Refinery production planning models Optimizing refinery

Grossmann, Ignacio E.

327

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

328

CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 224: DECON PAD AND SEPTIC SYSTEMS NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved CAU 224 CADD.

NONE

2006-07-01T23:59:59.000Z

329

LFRG Program Management Plan | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives Initiatives ThroughEnergy Kicking the OilEffort

330

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

331

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

332

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

333

Strategic Planning for Landowners  

E-Print Network [OSTI]

Strategic Planning for Landowners Risk Management E-146 RM3-12.0 09-08 *Assistant Professor and Extension Economist?Management, and Extension Specialist?Risk Management, The Texas A&M System Strategic planning is a process that provides direction... the bottom up. Managers are also responsible for Jason L. Johnson and Wade Polk* 2 carrying out those required daily tasks. Land- owners are often both manager and employee, which demands a combination of vision and technical aptitude. Steps for Setting...

Johnson, Jason; Polk, Wade

2008-09-16T23:59:59.000Z

334

Performance Management Plan  

SciTech Connect (OSTI)

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

335

Guam Strategic Energy Plan  

SciTech Connect (OSTI)

Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

Conrad, M. D.

2013-07-01T23:59:59.000Z

336

Career Planning - SRSCRO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASL Symposium: CelebratingMissionat|planning Career Planning

337

High performance computing and communications: FY 1995 implementation plan  

SciTech Connect (OSTI)

The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

NONE

1994-04-01T23:59:59.000Z

338

Sodium-Bearing Waste Treatment, Applied Technology Plan  

SciTech Connect (OSTI)

Settlement Agreement between the Department of Energy and the State of Idaho mandates treatment of sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center within the Idaho National Engineering and Environmental Laboratory. One of the requirements of the Settlement Agreement is to complete treatment of sodium-bearing waste by December 31, 2012. Applied technology activities are required to provide the data necessary to complete conceptual design of four identified alternative processes and to select the preferred alternative. To provide a technically defensible path forward for the selection of a treatment process and for the collection of needed data, an applied technology plan is required. This document presents that plan, identifying key elements of the decision process and the steps necessary to obtain the required data in support of both the decision and the conceptual design. The Sodium-Bearing Waste Treatment Applied Technology Plan has been prepared to provide a description/roadmap of the treatment alternative selection process. The plan details the results of risk analyzes and the resulting prioritized uncertainties. It presents a high-level flow diagram governing the technology decision process, as well as detailed roadmaps for each technology. The roadmaps describe the technical steps necessary in obtaining data to quantify and reduce the technical uncertainties associated with each alternative treatment process. This plan also describes the final products that will be delivered to the Department of Energy Idaho Operations Office in support of the office's selection of the final treatment technology.

Lance Lauerhass; Vince C. Maio; S. Kenneth Merrill; Arlin L. Olson; Keith J. Perry

2003-06-01T23:59:59.000Z

339

Introduction to Transportation Planning  

E-Print Network [OSTI]

Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

Tipple, Brett

340

PENSION PLAN INFORMATION SESSION  

E-Print Network [OSTI]

%)* QPP (20%) Personal Savings RRSP, TFSA Company Pension Plan (49%)** Government Benefits Personal.lastname@mcgill.ca). If you forget your McGill Username or McGill Password, try logging into Minerva with your 9-digit McGill ID number and PIN. Once you have logged in successfully, go to the Personal Menu > Password for Mc

Kambhampati, Patanjali

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

342

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

343

PNNL Campus Master Plan  

SciTech Connect (OSTI)

The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

Mosey, Whitney LC

2012-09-07T23:59:59.000Z

344

Multispecies Conservation Planning  

E-Print Network [OSTI]

CHAPTER 3 Multispecies Conservation Planning on U.S. Federal Lands Barry R. Noon, Kevin S. McKelvey, and Brett G. Dickson Numerous laws directly, or indirectly, mandate the conservation of all species that govern the use of these same lands that are in conflict with a goal of maximizing the conservation

345

Conservation Plan Issues  

E-Print Network [OSTI]

1 Northwest Power and Conservation Council Plan Issues: Regional Surplus Northwest Power and Conservation Council What is the Issue? · Some have expressed concern about the surplus that is included lean on the market and be fine ­ Calls into question the aggressive pursuit of conservation

346

Gonzales Comprehensive Plan  

E-Print Network [OSTI]

Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

2013-01-01T23:59:59.000Z

347

Student Health Benefit Plan  

E-Print Network [OSTI]

and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

Massachusetts at Amherst, University of

348

Search Criteria Health Plan  

E-Print Network [OSTI]

Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

Gleeson, Joseph G.

349

Business Services Strategic Plan  

E-Print Network [OSTI]

Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders Discovery with Delivery Meeting Global Challenges Excellence in Business and Support Services #12;Introduction The mission of Business Services at Purdue University is to enable, serve, and support others

Holland, Jeffrey

350

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

351

COMMUNITY WILDFIRE PROTECTION PLANS  

E-Print Network [OSTI]

natural resource knowledge and technical expertise to the planning process, particularly in the areas of GIS and mapping, vegetation management, assessment of values and risks and funding strategies. WHAT of the community, priorities for fuel treatment may include critical watersheds, public water and power facilities

352

Environmental Education Strategic Plan  

SciTech Connect (OSTI)

This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

none,

1991-12-01T23:59:59.000Z

353

Action Plan Materials Science  

E-Print Network [OSTI]

sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

Fitze, Patrick

354

Planning support systems for spatial planning through social learning  

E-Print Network [OSTI]

This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

Goodspeed, Robert (Robert Charles)

2013-01-01T23:59:59.000Z

355

Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan  

E-Print Network [OSTI]

Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan (CHP) (Appendix C in Lab Safety Manual........................................................................................................................1-1 Chapter 2: Chemical Hazard Communication....................................................................................2-1 Chapter 3: Classes of Hazardous Chemicals

Nizkorodov, Sergey

356

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 300 projects for the remainder of the term. 560 Macroecon Envir Bus 3.00 ADVISORY, ENFORCED 74595 P RW REC 451

Shyy, Wei

357

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 690 Arc is reserved for Executive MBA students only, and meets from 7/19- 9/6. 637 Macroecon Envir Bus 1.50 ADVISORY

Shyy, Wei

358

Incorporation of Detailed Chemical Mechanisms in Reactive Flow Simulations Using Element-Flux Analysis  

E-Print Network [OSTI]

ignition (HCCI) combustion with detailed chemistry by using the proposed on-the-fly reduction scheme detailed characterizations of in-cylinder behaviors in stratified HCCI engines by incorporating detailed was proposed for HCCI engines in which homogeneous charge was used. However, although termed "homogeneous

Androulakis, Ioannis (Yannis)

359

Optimizing a physical security configuration using a highly detailed simulation model  

E-Print Network [OSTI]

Optimizing a physical security configuration using a highly detailed simulation model Marechal, T. Email: tommarechal@hotmail.com Abstract This chapter focuses on using a highly detailed simulation model. In this chapter describes the use of a highly detailed simulation model to find a superior security configuration

Smith, Alice E.

360

NSED Monthly Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Risks Challenge Problem Planning Kick-off CRUD Product Integrator Plan DNB, GTRF, RIALOCA, PCI Product Applications Industry Council Test Stands and Applications...

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Massachusetts Ocean Management Plan (Massachusetts)  

Broader source: Energy.gov [DOE]

The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

362

Climate Action Plan (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

363

Accessibility-based transit planning  

E-Print Network [OSTI]

A method for evaluating transit planning proposals using accessibility metrics is advanced in this research. A transit-accessibility model is developed intended for use by in-house transit agency planning staff as a ...

Busby, Jeffrey R

2004-01-01T23:59:59.000Z

364

Agricultural Sciences Strategic Plan 20082013  

E-Print Network [OSTI]

Actions 15 Facilities and Land--Progress and Further Planning 24 FiveYear Recycling Plan and Program.This daring concept has led to a nationwide system of colleges and universities that create new knowledge

Kaye, Jason P.

365

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

366

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

367

Space Conditioning Standing Technical Committee Strategic Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

368

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

369

NERSC Strategic Plan Is Now Online  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. More NERSC...

370

NATIONAL PLAN TO ACHIEVE MARITIME DOMAIN AWARENESS  

E-Print Network [OSTI]

infrastructure following attack or similar disruption. · Maritime Transportation System Security Plan responds regarding the maritime domain. · Maritime Commerce Security Plan establishes a comprehensive plan to secure

Acton, Scott

371

Strategic Energy Planning | Department of Energy  

Office of Environmental Management (EM)

Resources Energy Resource Library Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy...

372

2030 Transportation and Mobility Plan  

E-Print Network [OSTI]

sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

Bi-State Metropolitan Planning Organization

2006-08-11T23:59:59.000Z

373

Climate Action Plan (Manitoba, Canada)  

Broader source: Energy.gov [DOE]

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

374

Energy Management and Conservation Plan  

E-Print Network [OSTI]

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

375

Planning and Search Exam format  

E-Print Network [OSTI]

is the frame problem. Revision 5 #12;Exam topics: planning Classical planning. How the problem definitionPlanning and Search Revision Revision 1 #12;Outline Exam format Exam topics How to revise Revision 2 #12;Exam format 4 questions out of 6 same format as 2010-2011 and 2011-2012 exams (on G52PAS

Alechina, Natasha

376

Clean Energy Business Plan Competition  

ScienceCinema (OSTI)

Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

2013-05-29T23:59:59.000Z

377

BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT  

E-Print Network [OSTI]

BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT Established in late 2001, My Sister's House Sister's House is offering a business plan competition to local college and graduate students to identify. The business plan which should be conducted under the approval of a business or business related professor

California at Davis, University of

378

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

379

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

380

CIPS Validation Data Plan  

SciTech Connect (OSTI)

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Business plan proposal  

E-Print Network [OSTI]

about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

Kucera, Carolyn

1991-01-01T23:59:59.000Z

382

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... when a motor fails and must either be replaced or repaired. This is represented visually in Figure 1. When purchasing a motor for a new application, time is usually available to consider various options. However, once a motor has failed...

Elliott, R. N.

383

Lubbock Metropolitan Transportation Plan  

E-Print Network [OSTI]

for Users (SAFETEA-LU) and its predecessors, the Transportation Equity Act for the 21st Century (TEA-21) and the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, specified the transportation systems on which certain federal funds can... in Chapter 5 ? Streets and Highways; Chapter 6 ? Public Transportation; Chapter 7 ? Bicycle and Pedestrian Plan; Chapter 8 ? Lubbock International Airport and Chapter 9 ? Railroads and Trucking. Federally funded transit projects were developed...

Lubbock Metropolitan Planning Organization

2007-09-18T23:59:59.000Z

384

Pretreatment Technology Plan  

SciTech Connect (OSTI)

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

385

ARM - Lesson Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related Information CollaborationsOrganizationLaboratoryPlans

386

Project Management Plan  

SciTech Connect (OSTI)

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

387

Mobile systems capability plan  

SciTech Connect (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

388

A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality  

SciTech Connect (OSTI)

Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of segments and delivery time were decreased. Increasing the minimum segment area parameter decreased the plan MU, but had less of an effect on the number of segments and delivery time. Our delivery time model predicted delivery time to within 1.8%. Conclusions: Increasing the dose grid while maintaining a small fluence grid allows for improved planning efficiency without compromising plan quality. Delivery efficiency can be improved by increasing the minimum MU, but not the minimum segment area. However, increasing the respective minimum MU and/or the minimum segment area to any value greater than 5 MU and 5 cm{sup 2} is not recommended because it degrades plan quality.

Mittauer, Kathryn [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 and J. Crayton Pruitt Family Department of Biomedical Engineering, University of Florida, Gainesville, Florida 32611 (United States); Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 (United States); Gopal, Arun [Department of Radiation Oncology, New York-Presbyterian Hospital, Columbia University, New York, New York 10032 (United States)

2013-06-15T23:59:59.000Z

389

EXPERIMENT DETAILS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for the Future of DOE Science WilliamEVDETAILS

390

Using Mobile Phone Data for Electricity Infrastructure Planning  

E-Print Network [OSTI]

Detailed knowledge of the energy needs at relatively high spatial and temporal resolution is crucial for the electricity infrastructure planning of a region. However, such information is typically limited by the scarcity of data on human activities, in particular in developing countries where electrification of rural areas is sought. The analysis of society-wide mobile phone records has recently proven to offer unprecedented insights into the spatio-temporal distribution of people, but this information has never been used to support electrification planning strategies anywhere and for rural areas in developing countries in particular. The aim of this project is the assessment of the contribution of mobile phone data for the development of bottom-up energy demand models, in order to enhance energy planning studies and existing electrification practices. More specifically, this work introduces a framework that combines mobile phone data analysis, socioeconomic and geo-referenced data analysis, and state-of-the-...

Martinez-Cesena, Eduardo Alejandro; Ndiaye, Mamadou; Schlpfer, Markus

2015-01-01T23:59:59.000Z

391

Update of the Used Fuel Disposition Campaign Implementation Plan  

SciTech Connect (OSTI)

This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

Jens Birkholzer; Robert MacKinnon; Kevin McMahon; Sylvia Saltzstein; Ken Sorenson; Peter Swift

2014-09-01T23:59:59.000Z

392

Deputy Inspector General for audit services. FY 1998 annual performance plan  

SciTech Connect (OSTI)

This plan outlines the audie strategies that the Deputy Inspector General for Audit Services intends to implement and execute in Fiscal Year (FY) 1998. The plan also includes the details of efforts to improve customer service and to implement the Inspector General`s streamlining initiatives. The FY 1997/1998 Strategic Plan emphasizes six key issue areas: Financial Management, Contract Administration, Program Management, Environmental Quality, Infrastructure and Administrative Safeguards. These issue areas were chosen to ensure that the Inspector General`s audit, inspection, and investigative functions are focused to assist the Department to reach its goals, pursue its strategies, and monitor its success indicators. This plan also establishes goals, objectives, and performance measures, which are discussed in detail in Appendix I.

NONE

1997-09-30T23:59:59.000Z

393

FY 1994 Annual Work Plan  

SciTech Connect (OSTI)

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

Not Available

1993-09-30T23:59:59.000Z

394

Project Management Plan Solution Stabilization  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

SATO, P.K.

1999-08-31T23:59:59.000Z

395

RELIABILITY PLANNING IN DISTRIBUTED ELECTRIC ENERGY SYSTEMS  

E-Print Network [OSTI]

RESILIENCE; OR RELIABILITY SENSITIVITy .. RiskReliability Planning: Preliminary Definitions.Dioision, Ext. 6782 Reliability Planning in Distributed

Kahn, E.

2011-01-01T23:59:59.000Z

396

TEST PLAN FOR MONITORING COOLING COILS IN A LABORATORY SETTING  

SciTech Connect (OSTI)

The objective of this research project is to understand and quantify the moisture removal performance of cooling coils at part-load conditions. The project will include a comprehensive literature review, detailed measurement of cooling coil performance in a laboratory facility, monitoring cooling systems at several field test sites, and development/validation of engineering models that can be used in energy calculations and building simulations. This document contains the detailed test plan for monitoring cooling coil performance in a laboratory setting. Detailed measurements will be taken on up to 10 direct expansion (DX) and chilled water cooling coils in various configurations to understand the impact of coil geometry and operating conditions on transient moisture condensation and evaporation.

Don B. Shirey, III

2002-04-01T23:59:59.000Z

397

TransBorder 2035 Metropolitan Transportation Plan  

E-Print Network [OSTI]

i TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org ii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007... El Paso Metropolitan Planning Organization www.elpasompo.org iii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org iv Trans...

El Paso Metropolitan Planning Organization

2007-11-16T23:59:59.000Z

398

Webinar: Guidance for Filling Out a Detailed H2A Production Case Study  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Guidance for Filling Out a Detailed H2A Production Case Study, originally presented on July 9, 2013.

399

E-Print Network 3.0 - anatomically detailed mri-derived Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(e.g. grey matter). Small details Source: Duncan, James S. - Departments of Diagnostic Radiology & Electrical Engineering, Yale University Collection: Biology and Medicine Page:...

400

Environmental Management System Plan  

SciTech Connect (OSTI)

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ESnet Program Plan 1994  

SciTech Connect (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

402

Institutional Plan FY 2003 - 2007  

SciTech Connect (OSTI)

The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

Chartock, Michael; Hansen, Todd

2003-01-27T23:59:59.000Z

403

Guidance for Planning Exercises  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel Cell VehicleEnergyGreensburgUMTRCA Title I and TitleandPlanning,

404

Planning, Budget, and Analysis  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSalesOE0000652GrowE-mail onThe2 DOE11.4 Planning and

405

Plans, Updates, Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006Photovoltaic Theory and ModelingPinkand Results Plans, Community,

406

planning for emergencies  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF8/%2A ennike |1/%2A en Planning for

407

ESnet Planning, Status,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct:DirectivesSAND2015-21271MostMirror ServersESnet Planning,

408

Strategic Plan: 2014 - 2018  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael Schaal Director, Oil and10:InformationSteamStrategic Plan:

409

Decommissioning Plan RM  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE Zero EnergyData Center Optimization Plan3Energy 4, 2007:

410

Vendor System Vulnerability Testing Test Plan  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INLs Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendors system.b a. The term System Provider replaces the name of the company/organization providing the system being evaluated. This can be the system manufacturer, a system user, or a third party organization such as a government agency. b. The term Vendor (or Vendors) System replaces the name of the specific SCADA/EMS being tested.

James R. Davidson

2005-01-01T23:59:59.000Z

411

Waste classification sampling plan  

SciTech Connect (OSTI)

The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998.

Landsman, S.D.

1998-05-27T23:59:59.000Z

412

Key Response Planning Factors for the Aftermath of Nuclear Terrorism  

SciTech Connect (OSTI)

Despite hundreds of above-ground nuclear tests and data gathered from Hiroshima and Nagasaki, the effects of a ground-level, low-yield nuclear detonation in a modern urban environment are still the subject of considerable scientific debate. Extensive review of nuclear weapon effects studies and discussions with nuclear weapon effects experts from various federal agencies, national laboratories, and technical organizations have identified key issues and bounded some of the unknowns required to support response planning for a low-yield, ground-level nuclear detonation in a modern U.S. city. This study, which is focused primarily upon the hazards posed by radioactive fallout, used detailed fallout predictions from the advanced suite of three-dimensional (3-D) meteorology and plume/fallout models developed at Lawrence Livermore National Laboratory (LLNL), including extensive global Key Response Planning Factors for the Aftermath of Nuclear Terrorism geographical and real-time meteorological databases to support model calculations. This 3-D modeling system provides detailed simulations that account for complex meteorology and terrain effects. The results of initial modeling and analysis were presented to federal, state, and local working groups to obtain critical, broad-based review and feedback on strategy and messaging. This effort involved a diverse set of communities, including New York City, National Capitol Regions, Charlotte, Houston, Portland, and Los Angeles. The largest potential for reducing casualties during the post-detonation response phase comes from reducing exposure to fallout radiation. This can be accomplished through early, adequate sheltering followed by informed, delayed evacuation.B The response challenges to a nuclear detonation must be solved through multiple approaches of public education, planning, and rapid response actions. Because the successful response will require extensive coordination of a large number of organizations, supplemented by appropriate responses by local responders and the general population within the hazard zones, regional planning is essential to success. The remainder of this Executive Summary provides summary guidance for response planning in three areas: (1) Public Protection Strategy details the importance of early, adequate shelter followed by informed evacuation. (2) Responder Priorities identify how to protect response personnel, perform regional situational assessment, and support public safety. (3) Key Planning Considerations refute common myths and provide important information on planning how to respond in the aftermath of nuclear terrorism.

Buddemeier, B R; Dillon, M B

2009-01-21T23:59:59.000Z

413

Range-separated density-functional theory with random phase approximation: Detailed formalism and illustrative applications  

E-Print Network [OSTI]

Range-separated density-functional theory with random phase approximation: Detailed formalism-body theory, we present the details of a formally exact adiabatic-connection fluctuation-dissipation density-functional´an, Phys. Rev. Lett. 102, 096404 (2009). Range-separated density-functional theory approaches combining

Boyer, Edmond

414

New study details glacier ice loss following ice shelf July 25, 2011  

E-Print Network [OSTI]

and Ted #12;Scambos of the NSIDC produced detailed ice loss maps from 2001 to 2009 for the main tributaryNew study details glacier ice loss following ice shelf collapse July 25, 2011 Contact: Anthony Lane UMBC (410) 455-5793 alane@umbc.edu Katherine Leitzell National Snow and Ice Data Center University

Cambridge, University of

415

Topological Reconstruction of Complex 3D Buildings and Automatic Extraction of Levels of Detail  

E-Print Network [OSTI]

and outdoor topology of a detailed 3D building model from its geometry and to extract different levelsTopological Reconstruction of Complex 3D Buildings and Automatic Extraction of Levels of Detail A is needed for most of the applications using 3D building models after the architects design it. While

Boyer, Edmond

416

EconoGrid: A detailed Simulation Model of a Standards-based Grid Compute Economy  

E-Print Network [OSTI]

EconoGrid: A detailed Simulation Model of a Standards-based Grid Compute Economy EconoGrid is a detailed simulation model, implemented in SLX1 , of a grid compute economy that implements selected of users. In a grid compute economy, computing resources are sold to users in a market where price

417

Cyclic Testing of Concrete-Filled Circular Steel Bridge Piers having Encased Fixed-Based Detail  

E-Print Network [OSTI]

Cyclic Testing of Concrete-Filled Circular Steel Bridge Piers having Encased Fixed-Based Detail elements during earthquakes, this paper reports on cyclic inelastic tests executed to determine the maximum strength and ductility of four concrete-filled circular steel piers joined to a foundation detail proposed

Bruneau, Michel

418

Evaluation of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Populations  

E-Print Network [OSTI]

Evaluation of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Buster is a stochastic, spatially explicit simulation model of Aedes aegypti populations, designed of Location-Specific Predictions by a Detailed Simulation Model of Aedes aegypti Populations. PLoS ONE 6(7): e

Lloyd, Alun

419

Oak Ridge National Laboratory Waste Management Plan  

SciTech Connect (OSTI)

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

420

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

422

Electric utility system master plan  

SciTech Connect (OSTI)

This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

Erickson, O.M.

1992-10-01T23:59:59.000Z

423

Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations  

SciTech Connect (OSTI)

The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work; therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.

Bainer, R.; Duarte, J.

1993-07-01T23:59:59.000Z

424

Long-range master plan for defense transuranic waste management  

SciTech Connect (OSTI)

The Long Range Master Plan for the Defense Transuranic Waste Program (DTWP), or ''Master Plan,'' details current TRU waste management plans and serves as a framework for the DTWP. Not all final decisions concerning activities presented in the Master Plan have been made (e.g., land withdrawal legislation, the WIPP Compliance and Operational Plan and the TRUPACT Certificate of Compliance). It is the goal of the DTWP to end interim storage and achieve permanent disposal of TRU waste. To accomplish this goal, as much TRU waste as possible will be certified to meet the WIPP Acceptance Criteria (WAC). The certified waste will then be disposed of at WIPP. The small quantity of waste which is not practical to certify will be disposed of via alternative methods that require DOE Headquarters approval and shall comply with the National Environmental Policy Act requirements and EPA/State Regulations. The definition of TRU waste is ''without regard to source or form, waste that is contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years and concentrations greater than 100 nanocuries/gram (nCi/g) at the time of assay. Heads of Field Elements can determine that other alpha contaminated wastes, peculiar to a specific site, must be managed as transuranic waste.''

Not Available

1988-12-01T23:59:59.000Z

425

Oil program implementation plan FY 1996--2000  

SciTech Connect (OSTI)

This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

NONE

1995-04-01T23:59:59.000Z

426

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect (OSTI)

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

427

Chemical Hygiene and Safety Plan  

E-Print Network [OSTI]

Preventive Maintenance .and Safet_l Plan 6. Preventive Maintenance Hazard ControlE-12, E-13, D-3 preventive maintenance, B-7, F-16 to F-18,

Ricks Editor, R.

2009-01-01T23:59:59.000Z

428

Community Energy Strategic Planning Resources  

Broader source: Energy.gov [DOE]

Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

429

Health & Safety Plan Last Updated  

E-Print Network [OSTI]

Health & Safety Plan Last Updated March 2008 1 #12;A. SCOPE AND RESPONSIBILITY....................................................................................................................................... 3 2. Safety and Health Policy...................................................................................................................... 3 4. Safety Coordinator

Anderson, Richard

430

Conversion Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation of new and converted filesdatabases; coordinates the...

431

Hanford 200 Areas Development Plan  

SciTech Connect (OSTI)

The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

Rinne, C.A.; Daly, K.S.

1993-08-01T23:59:59.000Z

432

Groundwater Protection Plan (West Virginia)  

Broader source: Energy.gov [DOE]

Groundwater Protection Plans (GPPs) are required for all facilities having the potential to impact groundwater. They are preventive maintenance documents that cover all processes and materials at...

433

Emergency Readiness Assurance Plans (ERAPs)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

434

Planning Water Use in California  

E-Print Network [OSTI]

the University of Maryland Water Policy Collaborative, 2006.FURTH ER READ ING California Department of Water Resources.California Water Plan Update 2005: A Framework for Action.

Eisenstein, William; Kondolf, G. Mathias

2008-01-01T23:59:59.000Z

435

National Grid Energy Efficiency Plans  

Broader source: Energy.gov [DOE]

Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

436

An information modeling framework for process planning  

E-Print Network [OSTI]

69 69 CHAPTER Page F G H Structure of Infons . The Model G. l. Process Plan G. 2. Process Plan Set G. 3. Process Plan Activity G. 4. Recursive Nature G. 5. Process Plan Set Element G. 6. Serial Process Plan Set . G. 7. Parallel Process... Knowle D. Implications of Dimensions and Tolerances E. Set-Up Planning F. Tool Path Planning G. Activity Parameter Specification 3. Observations of Situation Theoretic Modelling 4. Interaction Between Models A. Interaction in Terms of Databases B...

Atreya, Dinesh S.

1993-01-01T23:59:59.000Z

437

Human Service Transportation PlanHuman Service Transportation Plan UPDATEUPDATE  

E-Print Network [OSTI]

, Princeton Regions 1 and 3: full-time Bi-state Regional Commission, Rock Island Region 2: Part-time Tri-County Regional Planning Commission, Peoria (also MPO) Region 5: Part-time Champaign County Regional Planning, Macomb & Springfield- Sangamon County RPC, Springfield Region 4 and 7: full-time (by WIRC) South Central

Illinois at Chicago, University of

438

Sample Lesson Plan Safety and Health Programs 1 Lesson Plan  

E-Print Network [OSTI]

culture that reduces accidents for workers and improves the bottom line for managers. When safetySample Lesson Plan ­ Safety and Health Programs 1 Lesson Plan General Industry Outreach Training Program (10-hour) Topic: Safety and Health Programs Overview Effective management of worker safety

Homes, Christopher C.

439

Heat Plan DenmarkHeat Plan Denmark Anders Dyrelundy  

E-Print Network [OSTI]

the supply and the demand side · An eye-opener for the Danish politicians · Could be a model for otherHeat Plan DenmarkHeat Plan Denmark Anders Dyrelundy Market Manager for Energy and Climate Rambøll Möller · The first study in Denmark, really to integrate the energy and building sectors ­ to combine

440

A reservoir management plan  

SciTech Connect (OSTI)

There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

Allis, R.G.

1989-06-16T23:59:59.000Z

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Thermal Stabilization Blend Plan  

SciTech Connect (OSTI)

This Blend Plan documents the feed material items that are stored in 2736-2 vaults, the 2736-ZB 638 cage, the 192C vault, and the 225 vault that will be processed through the thermal stabilization furnaces. The purpose of thermal stabilization is to heat the material to 1000 degrees Celsius to drive off all water and leave the plutonium and/or uranium as oxides. The stabilized material will be sampled to determine the Loss On Ignition (LOI) or percent water. The stabilized material must meet water content or LOI of less than 0.5% to be acceptable for storage under DOE-STD-3013-99 specifications. Out of specification material will be recycled through the furnaces until the water or LOI limits are met.

RISENMAY, H.R.

2000-05-02T23:59:59.000Z

442

GEND planning report  

SciTech Connect (OSTI)

The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

None

1980-10-01T23:59:59.000Z

443

Mitigation Action Plan  

SciTech Connect (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

444

Multicriteria optimization informed VMAT planning  

SciTech Connect (OSTI)

We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionationtreated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO-IMRT or both is necessary.

Chen, Huixiao; Craft, David L.; Gierga, David P., E-mail: dgierga@partners.org

2014-04-01T23:59:59.000Z

445

Planning your business: The Business Plan A business plan is like a road map for your business. Careful  

E-Print Network [OSTI]

Planning your business: The Business Plan A business plan is like a road map for your business. Careful planning is key to any successful business. A business plan ensures that resources are available, including (time, money, and opportunities). It helps you decide where you want to go with the business

446

Planning Tool for Strategic Evaluation of Facility Plans - 13570  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)] [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

2013-07-01T23:59:59.000Z

447

NATIONAL PLANNING EXCELLENCE AWARD FOR  

E-Print Network [OSTI]

Bloomberg's commitment to sustainability. While glossy plans and lofty visions are important to a planning today. "In keeping with the Bloomberg ad- ministration's PlaNYC sustainability ob- jectives, city USES ALLOWANCES FOR WIND TURBINES BY BUILDING TYPE AND LOCATION BUILDING FACADE PROJECTIONS OF "SUN

Handy, Susan L.

448

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

449

GENERAL PENSION PLAN INFORMATION SESSION  

E-Print Network [OSTI]

rates · Age 30 · Earning $50,000 · Retiring at age 65 · Salary Increase: 3% · Investment Return: 5% Cost is intended to inform you about the McGill Pension Plan & the importance of integrating pension investmentGill University Pension Plan; Familiarize yourself with investment basics; Understand the importance

Kambhampati, Patanjali

450

TECHNOLOGY MASTER PLAN 2013 2015  

E-Print Network [OSTI]

TECHNOLOGY MASTER PLAN 2013 2015 Endorsed by Academic Senate On October 25, 2013 & College Council On November 8, 2013 #12;Information Technology Strategic Plan 2013-2015 Prepared by Willie Pritchard & Gene Spencer, Higher Education Technology Consultants on behalf of the many participants

451

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

452

Business Plan Development Company Description  

E-Print Network [OSTI]

by the establishment of additional work stations. Raw materials purchasing and subsequent manufacturing need to be done purchasing and manufacturing under my personal name to-date. The concept of the device I patented market, marketing plan, web development, manufacturing plan to allow for maximum profit margin while

Dahl, David B.

453

LDRD FY 2014 Program Plan  

SciTech Connect (OSTI)

As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

Anita Gianotto; Dena Tomchak

2013-08-01T23:59:59.000Z

454

Regional water planning Milind Sohoni  

E-Print Network [OSTI]

irrigation: generally subsidized by state poor households generally subsidized within community #12;CaseRegional water planning Milind Sohoni Pooja Prasad CTARA IIT Bombay #12;Need for planning Rising Annual Gross Utilisation : 134.26 Mcft. 166.08 Mcft. 12 Top of Dam Level : 103.00 m. 134.00 m. 13 H

Sohoni, Milind

455

Choosing between Blue Cross plans...  

E-Print Network [OSTI]

Choosing between Blue Cross plans... ...when you have Medicare PresentedPresented By Glenn. Medicare and UC II. Medicare and Anthem Blue Cross III. Plan Comparisons · Pros/Cons · Medical coverage will automatically be enrolled in Part D by Blue Cross No additional Part D premium · Blue Cross members have

Burke, Peter

456

What Is the Plan Commission  

E-Print Network [OSTI]

What Is the Plan Commission & How Does It Work? Purdue University Cooperative Extension Service valuable to the community and to its elected and appointed officials. Plans and proposals from individuals- nance, and a subdivision ordinance. They also make recommendations to elected officials on proposed

457

FORESTRY BUILDING: BUILDING EMERGENCY PLAN  

E-Print Network [OSTI]

FORESTRY BUILDING: BUILDING EMERGENCY PLAN Date Adopted: August 18, 2009 Date Revised June 17, 2013 Prepared By: Diana Evans and Jennifer Meyer #12;PURDUE UNIVERSITY BUILDING EMERGENCY PLAN VERSION 3 2 Table Suspension or Campus Closure SECTION 3: BUILDING INFORMATION 3.1 Building Deputy/Alternate Building Deputy

458

STATE ALTERNATIVE FUELS PLAN COMMISSIONREPORT  

E-Print Network [OSTI]

endorsement of the Plan. Accubuilt Mobility Division Air Products and Chemicals, Inc. Alaska Natural GasSTATE ALTERNATIVE FUELS PLAN COMMISSIONREPORT December 2007 CEC-600-2007-011-CMF California Air Resources Board California Energy Commission Arnold Schwarzenegger, Governor #12;CALIFORNIA AIR RESOURCES

459

Y-12 Site Sustainability Plan  

SciTech Connect (OSTI)

This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

none,; Erhart, S C; Spencer, C G

2013-12-01T23:59:59.000Z

460

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network [OSTI]

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Optimal Model-Based Production Planning  

E-Print Network [OSTI]

Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor: Ignacio;Outline Introduction Refinery Planning Model Development LP Planning Models NLP Planning Models FI Model Aggregate Model Conclusion & Future work 2 #12;3 Introduction Refinery production planning

Grossmann, Ignacio E.

462

Office of Information Technology Strategic Planning Process  

E-Print Network [OSTI]

Office of Information Technology Strategic Planning Process June 2012 Marc Hoit, Ph.D. Vice Strategic Planning Process June 2012 Page 2 Office of Information Technology Strategic Planning Process of Information Technology Strategic Planning Process #12;Office of Information Technology Strategic Planning

Liu, Paul

463

FY 1996 annual work plan  

SciTech Connect (OSTI)

In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

NONE

1995-09-30T23:59:59.000Z

464

A Model and Approach for Optimal Power Systems Planning and Investment  

E-Print Network [OSTI]

amounts of energy from wind and solar generators, batteries, and demand- side market participants. Some incorporates the detailed gener- ator, topology and operational aspects found in production cost planning expected benefits, while also representing generic generation expansions under the same objective

Oren, Shmuel S.

465

Biennial Assessment of the Fifth Power Plan Assessment of Other Generating Technologies  

E-Print Network [OSTI]

and wind power, covered in more detail in specific papers. The paper begins with an overview of generating adoption of the Plan. Wind plant construction is driven by extension of the federal production tax credit of wind power development in the Northwest. A preliminary estimate prepared for the Northwest Wind

466

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan  

E-Print Network [OSTI]

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan #12;The 2009 Stock Take Report provides a detailed appraisal of progress against the nine Strategic Goals of the University's performance over the previous 12 months. In relation to accountability, each Stock Take Report

Heil, Matthias

467

Kick-Off Speakers | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington, DC

468

EV Everywhere Challenge Kick-Off  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday, September 25 PRE-MEETINGBattery EV

469

EV Everywhere Grand Challenge Kick-Off  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday, September 25- 7/20/2012 ElectricA EV

470

ALS@20 Kick-Off Celebration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011Astudies smartHistory: The FirstUsers'ALSALS@20

471

http://www.regulations.gov/#!documentDetail;D=EERE-2014-BT-STD...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

http:www.regulations.govdocumentDetail;DEERE-2014-BT-STD-0031-0002 EERE-2014-BT-STD-0031-0002 spreadsheet Sheet "Summary Switching" - Before ME1 19421032v.1 http:...

472

Proof Details for "Performance Analysis of Godard-Based Blind Channel Identification"  

E-Print Network [OSTI]

1 Proof Details for "Performance Analysis of Godard-Based Blind Channel Identification" Philip) The bulk of the proof is spent analyzing the righthand term above. E ^^h(0) i - ^h(0) i 2 2 = E ^^h(0) i 2

Schniter, Philip

473

INITIATIVE MOBILE APPS DEVELOPMENT Description and details about the program or initiative that is being proposed  

E-Print Network [OSTI]

INITIATIVE ­ MOBILE APPS DEVELOPMENT Description and details about the program or initiative using mobile technologies. Adoption of these technologies will allow UWM to communicate with students university vision? What guiding values are applied? Access: Mobile technologies provide more options

Saldin, Dilano

474

Embedding methods for massing and detail design in computer generated design of skyscrapers  

E-Print Network [OSTI]

This thesis proposes a new digital system to construct the massing and details of skyscrapers. It extracts underlying rules and design conventions from significant projects in contemporary skyscraper design practice. These ...

Chen, Shouheng, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

475

School of Electrical & Computer Engineering -Undergraduate Post Graduate Activities Detail & History  

E-Print Network [OSTI]

& Computer Engineering - Undergraduate (continued) 2010 Employment Employer Title City State General Motors2010 School of Electrical & Computer Engineering - Undergraduate Post Graduate Activities Detail Engineering undergraduate students from the Class of 2010. Historical data is provided to allow for comparison

Lipson, Michal

476

Detailed chemical kinetic mechanism for the oxidation of biodiesel fuels blend surrogate  

E-Print Network [OSTI]

1 Detailed chemical kinetic mechanism for the oxidation of biodiesel fuels blend surrogate of biodiesel fuels in diesel and homogeneous charge compression ignition engines. Keywords: Methyl decanoate; Methyl decenoate; Surrogate; Oxidation; Biodiesel fuels; Kinetic modeling; Engine; Low

Paris-Sud XI, Université de

477

Elucidating secondary organic aerosol from diesel and gasoline vehicles through detailed characterization of  

E-Print Network [OSTI]

Elucidating secondary organic aerosol from diesel and gasoline vehicles through detailed 19, 2012 (received for review July 22, 2012) Emissions from gasoline and diesel vehicles composition, mass distribu- tion, and organic aerosol formation potential of emissions from gasoline

Silver, Whendee

478

Detailed mining study phase 3: Saba Yoi lignite deposit. Export trade information  

SciTech Connect (OSTI)

The study, conducted by John T. Boyd Company, was funded by the U.S. Trade and Development Agency on behalf of the Electricity Generating Authority of Thailand. The report presents Phase 3 of the feasibility study conducted for the development of the Saba Yoi Coal Mine. The study focuses on technical issues related to the development of the project including geological data and detailed mine development and scheduling. The report is divided into the following sections: (1) General Statement; (2) Summarized Findings; (3) Background; (4) Geology and Resources; (5) Geotechnical/Hydrogeological; (6) Detailed Mine Development; (7) Detailed Mine Production Scheduling; (8) Detailed Mine Analysis; (9) Mine Development and Facilities; (10) Mine Labor and Wages; and (11) Project Economics.

NONE

1994-07-01T23:59:59.000Z

479

Graphite Technology Development Plan  

SciTech Connect (OSTI)

This technology development plan is designed to provide a clear understanding of the research and development direction necessary for the qualification of nuclear grade graphite for use within the Next Generation Nuclear Plant (NGNP) reactor. The NGNP will be a helium gas cooled Very High Temperature Reactor (VHTR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Considerable effort will be required to ensure that the graphite performance is not compromised during operation. Based upon the perceived requirements the major data needs are outlined and justified from the perspective of reactor design, reatcor performance, or the reactor safety case. The path forward for technology development can then be easily determined for each data need. How the data will be obtained and the inter-relationships between the experimental and modeling activities will define the technology development for graphite R&D. Finally, the variables affecting this R&D program are discussed from a general perspective. Factors that can significantly affect the R&D program such as funding, schedules, available resources, multiple reactor designs, and graphite acquisition are analyzed.

W. Windes; T. Burchell; R. Bratton

2007-09-01T23:59:59.000Z

480

Major Efforts 2010-2015 Strategic Plan  

E-Print Network [OSTI]

pay syste o acu ty · FY12 OMB submission and FY12 budget planning · Enrollment planning #12;#12;Major Efforts · 2010-2015 Strategic Plan · Trustees approved at Sep meeting · http

Bieber, Michael

Note: This page contains sample records for the topic "detailed planning kicks" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

UMass Amherst Campus Planning INTEGRATED DESIGN BUILDING  

E-Print Network [OSTI]

#12;UMass Amherst Campus Planning Hills House IDB Program Vision IDB;UMass Amherst Campus Planning Hills House Exterior cladding failure Poor airDvity and ecological awareness. #12;UMass Amherst Campus Planning Program Spaces Studios

Massachusetts at Amherst, University of

482

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

483

OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT  

E-Print Network [OSTI]

OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

Leng, Chenlei

484

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network [OSTI]

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

485

Cerda and Barcelona : research and plan  

E-Print Network [OSTI]

The Industrial Revolution had a huge impact on nineteenth century cities had plans to expand the "old city". Due to its historical controversy a plans developed during that time was the Eixample plan in Barcelona. The ...

Alonso Fernndez, Valeria, 1977-

2008-01-01T23:59:59.000Z

486

Material Stabilization Project Management Plan  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

SPEER, D.R.

1999-09-01T23:59:59.000Z

487

New Mexico State University Dining Services Master PlanDining Services Master Plan  

E-Print Network [OSTI]

within a framework of financial self- sustainment. The Dining Services Master Plan is founded with other strategic planning initiatives such as the Campus Master Plan, Housing Master Plan and Corbett program, and an evaluation of the impact of the Campus Master Plan, Housing Master Plan and Corbett Center

Nishiguchi, Michele

488

LM Annual NEPA Planning Summary 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 More Documents & Publications 2010...

489

Site Sustainability Plan (SSP) 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 2013 Site Sustainability Plan More Documents & Publications Site...

490

Site Sustainability Plan (SSP) 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 Site Sustainability Plan (SSP) 2010 Site Sustainability Plan (SSP) 2010 2010 More Documents & Publications Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2013...

491

Site Sustainability Plan (SSP) 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2012 2012 More Documents & Publications Site Sustainability Plan (SSP) 2013 2014 Site Sustainability Plan Site...

492

Hydrogen Posture Plan: An Integrated Research, Development and...  

Energy Savers [EERE]

Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan The 2006...

493

CrystalPlan: an Experiment Planning Tool for Crystallography  

SciTech Connect (OSTI)

Beam time at large user program based x-ray and neutron scattering facilities is in high demand and always at a premium. CrystalPlan, a highly efficient experiment planning software has been developed to maximize the use of available beamtime per sample per experiment. This program can calculate and optimize the data coverage of a crystal in reciprocal space in a single-crystal diffraction time-of- flight experiment. CrystalPlan can help a user build an experiment plan that will acquire the most data possible, with sufficient coverage but limited redundancy, therefore increasing scientific productivity. A user friendly GUI including a 3D viewer, an automated coverage optimizer, and an option to reorient the crystal for the measurement of selected hkls on specific detector positions are among its useful features. A sample use case of the program with the TOPAZ beamline at SNS will be presented.

Zikovsky, Janik L [ORNL; Peterson, Peter F [ORNL; Wang, Xiaoping [ORNL; Frost, Matthew J [ORNL; Hoffmann, Christina [ORNL

2011-01-01T23:59:59.000Z

494

Family Emergency Preparedness Plan 1 Family Emergency Preparedness Plan  

E-Print Network [OSTI]

........................................................................................10 Utilities services and government agencies may not be able to respond to your needs immediately. Their buildings to plan to be on our own for a minimum of three days. While we cannot stop these disasters from occurring

Noble, James S.

495

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

496

Tank waste remediation system multi-year work plan  

SciTech Connect (OSTI)

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

497

Social Impact Management Plans: Innovation in corporate and public policy  

SciTech Connect (OSTI)

Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: Social impact management plans are effective strategies to manage social issues. They are developed in partnership with regulatory agencies, investors and community. SIMPs link assessment to ongoing management and address social and community issues. SIMPs clarify responsibilities in the management of impacts, opportunities and risks. SIMPs demonstrate a shift to include management as a core component of SIA practice.

Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

2013-11-15T23:59:59.000Z

498

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

499

Steel-framed buildings: Impacts of wall detail configurations on the whole wall thermal performance  

SciTech Connect (OSTI)

The main objective of this paper is the influence of architectural wall details on the whole wall thermal performance. Whole wall thermal performance analysis was performed for six light gage steel-framed wall systems (some with wood components). For each wall system, all wall details were simulated using calibrated 3-D finite difference computer modeling. The thermal performance of the six steel-framed wall systems included various system details and the whole wall system thermal performance for a typical single-story ranch house. Currently, predicted heat losses through building walls are typically based on measurements of the wall system clear wall area using test methods such as ASTM C 236 or are calculated by one of the procedures recommended in the ASHRAE Handbook of Fundamentals that often is carried out for the clear wall area exclusively. In this paper, clear wall area is defined as the part of the wall system that is free of thermal anomalies due to building envelope details or thermally unaffected by intersections with other surfaces of the building envelope. Clear wall experiments or calculations normally do not include the effects of building envelope details such as corners, window and door openings, and structural intersections with roofs, floors, ceilings, and other walls. In steel-framed wall systems, these details typically consist of much more structural components than the clear wall. For this situation, the thermal properties measured or calculated for the clear wall area do not adequately represent the total wall system thermal performance. Factors that would impact the ability of today`s standard practice to accurately predict the total wall system thermal performance are the accuracy of the calculation methods, the area of the total wall that is clear wall, and the quantity and thermal performance of the various wall system details.

Kosny, J.; Desjarlais, A.O.; Christian, J.E.

1998-06-01T23:59:59.000Z

500

Municipal Energy Plan Program (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Ontario is supporting local energy planning by introducing the Municipal Energy Plan (MEP) program. The MEP program is designed to help municipalities better understand their local energy needs ...