National Library of Energy BETA

Sample records for design permits sampling

  1. The Design of an Emissions Permit Market for RECLAIM: A Holistic Approach

    E-Print Network [OSTI]

    Goldenberg, Evan

    1993-01-01

    31. EMISSIONS PERMIT MARKET DESIGN uities may arise because144. EMISSIONS PERMIT MARKET DESIGN schemes because it makesEMISSIONS PERMIT MARKET DESIGN auctions, it is impossible to

  2. 3 - DJ : sampling as design

    E-Print Network [OSTI]

    Patel, Sayjel Vijay

    2015-01-01

    3D Sampling is introduced as a new spatial craft that can be applied to architectural design, akin to how sampling is applied in the field of electronic music. Through the development of 3-DJ, a prototype design software, ...

  3. 2003 CBECS Sample Design

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (Billion Cubic Feet)Decade Year-0ProvedDecade Year-0Cubic MonthlyTechnical Information > Sample

  4. Design of bioaerosol sampling inlets 

    E-Print Network [OSTI]

    Nene, Rohit Ravindra

    2007-09-17

    An experimental investigation involving the design, fabrication, and testing of an ambient sampling inlet and two additional Stokes-scaled inlets is presented here. Testing of each inlet was conducted at wind speeds of 2, 8, and 24 km/h (0.55, 2...

  5. Deliverable 2: Report on Final Design and Permitting

    E-Print Network [OSTI]

    Deliverable 2: Report on Final Design and Permitting Crissy Field Center Wind Power Study HNEI Field Center Wind Power Study December 2, 2012 Deliverable 2 Background Per the terms of the project, and power generation for each wind energy system. Data from the DAS shall be made available to HNEI

  6. Thermal Design of a Metal Hydride Storage Bed, Permitting Tritium Accountancy to 0.1% Resolution and Repeatability

    E-Print Network [OSTI]

    Thermal Design of a Metal Hydride Storage Bed, Permitting Tritium Accountancy to 0.1% Resolution and Repeatability

  7. Representativeness-based Sampling Network Design for the State...

    Office of Scientific and Technical Information (OSTI)

    Representativeness-based Sampling Network Design for the State of Alaska Citation Details In-Document Search Title: Representativeness-based Sampling Network Design for the State...

  8. Representativeness based Sampling Network Design for the State...

    Office of Scientific and Technical Information (OSTI)

    Representativeness based Sampling Network Design for the State of Alaska Title: Representativeness-based Sampling Network Design for the State of Alaska Authors: Forrest M. Hoffman...

  9. Representativeness-Based Sampling Network Design for the State...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Representativeness-Based Sampling Network Design for the State of Alaska Citation Details In-Document Search Title: Representativeness-Based Sampling Network...

  10. Design Review Report for formal review of safety class features of exhauster system for rotary mode core sampling

    SciTech Connect (OSTI)

    JANICEK, G.P.

    2000-06-08

    Report documenting Formal Design Review conducted on portable exhausters used to support rotary mode core sampling of Hanford underground radioactive waste tanks with focus on Safety Class design features and control requirements for flammable gas environment operation and air discharge permitting compliance.

  11. A BASIS FOR MODIFYING THE TANK 12 COMPOSITE SAMPLING DESIGN

    SciTech Connect (OSTI)

    Shine, G.

    2014-11-25

    The SRR sampling campaign to obtain residual solids material from the Savannah River Site (SRS) Tank Farm Tank 12 primary vessel resulted in obtaining appreciable material in all 6 planned source samples from the mound strata but only in 5 of the 6 planned source samples from the floor stratum. Consequently, the design of the compositing scheme presented in the Tank 12 Sampling and Analysis Plan, Pavletich (2014a), must be revised. Analytical Development of SRNL statistically evaluated the sampling uncertainty associated with using various compositing arrays and splitting one or more samples for compositing. The variance of the simple mean of composite sample concentrations is a reasonable standard to investigate the impact of the following sampling options. Composite Sample Design Option (a). Assign only 1 source sample from the floor stratum and 1 source sample from each of the mound strata to each of the composite samples. Each source sample contributes material to only 1 composite sample. Two source samples from the floor stratum would not be used. Composite Sample Design Option (b). Assign 2 source samples from the floor stratum and 1 source sample from each of the mound strata to each composite sample. This infers that one source sample from the floor must be used twice, with 2 composite samples sharing material from this particular source sample. All five source samples from the floor would be used. Composite Sample Design Option (c). Assign 3 source samples from the floor stratum and 1 source sample from each of the mound strata to each composite sample. This infers that several of the source samples from the floor stratum must be assigned to more than one composite sample. All 5 source samples from the floor would be used. Using fewer than 12 source samples will increase the sampling variability over that of the Basic Composite Sample Design, Pavletich (2013). Considering the impact to the variance of the simple mean of the composite sample concentrations, the recommendation is to construct each sample composite using four or five source samples. Although the variance using 5 source samples per composite sample (Composite Sample Design Option (c)) was slightly less than the variance using 4 source samples per composite sample (Composite Sample Design Option (b)), there is no practical difference between those variances. This does not consider that the measurement error variance, which is the same for all composite sample design options considered in this report, will further dilute any differences. Composite Sample Design Option (a) had the largest variance for the mean concentration in the three composite samples and should be avoided. These results are consistent with Pavletich (2014b) which utilizes a low elevation and a high elevation mound source sample and two floor source samples for each composite sample. Utilizing the four source samples per composite design, Pavletich (2014b) utilizes aliquots of Floor Sample 4 for two composite samples.

  12. General Permit General Permit

    E-Print Network [OSTI]

    L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J Reserved Parking PV LOT General Parking after 3 p.m. WEST CAMPUS PARKING LOT O General Permit Parking LOT M General Permit Parking LOT P

  13. Sample design for the residential energy consumption survey

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    The purpose of this report is to provide detailed information about the multistage area-probability sample design used for the Residential Energy Consumption Survey (RECS). It is intended as a technical report, for use by statisticians, to better understand the theory and procedures followed in the creation of the RECS sample frame. For a more cursory overview of the RECS sample design, refer to the appendix entitled ``How the Survey was Conducted,`` which is included in the statistical reports produced for each RECS survey year.

  14. General Permit General Permit

    E-Print Network [OSTI]

    98 28 28 60 96 31 7 23 LOT L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J Reserved Parking PV LOT General Parking after 3 p.m. WEST CAMPUS PARKING LOT O General Permit Parking LOT M General

  15. Design of dynamic Hohlraum opacity samples to increase measured sample density on Z

    SciTech Connect (OSTI)

    Nash, T. J.; Rochau, G. A.; Bailey, J. E. [Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)

    2010-10-15

    We are attempting to measure the transmission of iron on Z at plasma temperatures and densities relevant to the solar radiation and convection zone boundary. The opacity data published by us to date has been taken at an electron density about a factor of 10 below the 9x10{sup 22}/cm{sup 3} electron density of this boundary. We present results of two-dimensional (2D) simulations of the heating and expansion of an opacity sample driven by the dynamic Hohlraum radiation source on Z. The aim of the simulations is to design foil samples that provide opacity data at increased density. The inputs or source terms for the simulations are spatially and temporally varying radiation temperatures with a Lambertian angular distribution. These temperature profiles were inferred on Z with on-axis time-resolved pinhole cameras, x-ray diodes, and bolometers. A typical sample is 0.3 {mu}m of magnesium and 0.078 {mu}m of iron sandwiched between 10 {mu}m layers of plastic. The 2D LASNEX simulations indicate that to increase the density of the sample one should increase the thickness of the plastic backing.

  16. Design of dynamic hohlraum opacity samples to increase measured sample density on Z.

    SciTech Connect (OSTI)

    Rochau, Gregory Alan; Nash, Thomas J.; Bailey, James E.

    2010-03-01

    We are attempting to measure the transmission of iron on Z at plasma temperatures and densities relevant to the solar radiation and convection zone boundary. The opacity data published by us to date has been taken at an electron density about a factor of 10 below the 9 x 10{sup 22}/cm{sup 3} electron density of this boundary. We present results of two-dimensional (2D) simulations of the heating and expansion of an opacity sample driven by the dynamic Hohlraum radiation source on Z. The aim of the simulations is to design foil samples that provide opacity data at increased density. The inputs or source terms for the simulations are spatially and temporally varying radiation temperatures with a Lambertian angular distribution. These temperature profiles were inferred on Z with on-axis time-resolved pinhole cameras, x-ray diodes, and bolometers. A typical sample is 0.3{micro}m of magnesium and 0.078{micro}m of iron sandwiched between 10{micro}m layers of plastic. The 2D LASNEX simulations indicate that to increase the density of the sample one should increase the thickness of the plastic backing.

  17. Industrial Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the National Pollutant Discharge Elimination System....

  18. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  19. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-18

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. Therefore, empirically based approaches that are used for other regions, such as Western North America, are not appropriate for Eastern North America. Moreover, recent advances in science and technology have now made it possible to combine theoretical and empirical methods to develop new procedures and models for estimating ground motion. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. Specifically considered are magnitudes M from 5 to 8, distances from 0 to 500 km, and frequencies from 1 to 35 Hz.

  20. Early Site Permit Demonstration Program: Guidelines for determining design basis ground motions. Volume 2, Appendices

    SciTech Connect (OSTI)

    Not Available

    1993-03-18

    This report develops and applies a methodology for estimating strong earthquake ground motion. The motivation was to develop a much needed tool for use in developing the seismic requirements for structural designs. An earthquake`s ground motion is a function of the earthquake`s magnitude, and the physical properties of the earth through which the seismic waves travel from the earthquake fault to the site of interest. The emphasis of this study is on ground motion estimation in Eastern North America (east of the Rocky Mountains), with particular emphasis on the Eastern United States and southeastern Canada. Eastern North America is a stable continental region, having sparse earthquake activity with rare occurrences of large earthquakes. While large earthquakes are of interest for assessing seismic hazard, little data exists from the region to empirically quantify their effects. The focus of the report is on the attributes of ground motion in Eastern North America that are of interest for the design of facilities such as nuclear power plants. This document, Volume II, contains Appendices 2, 3, 5, 6, and 7 covering the following topics: Eastern North American Empirical Ground Motion Data; Examination of Variance of Seismographic Network Data; Soil Amplification and Vertical-to-Horizontal Ratios from Analysis of Strong Motion Data From Active Tectonic Regions; Revision and Calibration of Ou and Herrmann Method; Generalized Ray Procedure for Modeling Ground Motion Attenuation; Crustal Models for Velocity Regionalization; Depth Distribution Models; Development of Generic Site Effects Model; Validation and Comparison of One-Dimensional Site Response Methodologies; Plots of Amplification Factors; Assessment of Coupling Between Vertical & Horizontal Motions in Nonlinear Site Response Analysis; and Modeling of Dynamic Soil Properties.

  1. Design of an ambient aerosol sampling system for high and medium speed applications 

    E-Print Network [OSTI]

    Irshad, Hammad

    2002-01-01

    Two ambient sampling systems were designed and tested for high speed sampling application for a wind speed range of 4.47 m/s to 26.82 m/s. These systems will be used as inlets for sampling of bioaerosol from air. These systems consist of shrouded...

  2. Press fit design : force and torque testing of steel dowel pins in brass and nylon samples

    E-Print Network [OSTI]

    Nelson, Alexandra T

    2006-01-01

    An experimental study was conducted to determine the accuracy of current press fit theory when applied to press fit design. Brass and nylon hex samples were press fitted with hardened steel dowel pins. Press fit force and ...

  3. Benchmarking and Disclosure: State and Local Policy Design Guide and Sample Policy Language

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-16

    Provides sample policy language based on a synthesis of existing state and local policies, and discussion on key provisions, for the design of a commercial benchmarking and disclosure policy.

  4. Radiological Monitoring Results For Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: May 1, 2010-October 31, 2010

    SciTech Connect (OSTI)

    David B. Frederick

    2011-02-01

    This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond (#LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

  5. Radiological Monitoring Results for Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: November 1, 2011-October 31, 2012

    SciTech Connect (OSTI)

    Mike lewis

    2013-02-01

    This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond WRU-I-0160-01, Modification 1 (formerly LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

  6. Radiological Monitoring Results For Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: November 1, 2010-October 31, 2011

    SciTech Connect (OSTI)

    David Frederick

    2012-02-01

    This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond (No.LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

  7. Radiological Monitoring Results for Groundwater Samples Associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Pond: November 1, 2012-October 31, 2013

    SciTech Connect (OSTI)

    Mike Lewis

    2014-02-01

    This report summarizes radiological monitoring performed on samples from specific groundwater monitoring wells associated with the Industrial Wastewater Reuse Permit for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond WRU-I-0160-01, Modification 1 (formerly LA-000160-01). The radiological monitoring was performed to fulfill Department of Energy requirements under the Atomic Energy Act.

  8. An optimally designed stack effluent sampling system with transpiration for active transmission enhancement 

    E-Print Network [OSTI]

    Schroeder, Troy J.

    1995-01-01

    probe design using 10 iim liquid particles in a free stream velocity of 20 m/s indicated the design (when attached to the elbow assembly inentioned below) to have a transmission ratio of 107, 7% with a standard deviation of 2. 9%. When placed in field...AN OPTIMALLY DESIGNED STACK EFFLUENT SAMPLING SYSTEM WITH TRANSPIRATION FOR ACTIVE TRANSMISSION ENHANCEMENT TROY J. SCHROEDER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

  9. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  10. Washington Environmental Permit Handbook - NPDES Individual Permit...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Individual Permit Coverage Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  11. Solar Permitting Law

    Broader source: Energy.gov [DOE]

    This legislation also addressed permitting fees for solar systems.  Counties and cities may not charge permit fees for solar permit applications specifically, but they can charge building permit ...

  12. Small-sample brain mapping: sparse recovery on spatially correlated designs with randomization and clustering

    E-Print Network [OSTI]

    Kaski, Samuel

    Small-sample brain mapping: sparse recovery on spatially correlated designs with randomization Abstract Functional neuroimaging can measure the brain's response to an external stimulus. It is used to perform brain mapping: identi- fying from these observations the brain re- gions involved. This problem

  13. VIRTUAL TRAINING CENTRE FOR SHOE DESIGN: A SAMPLE VIRTUAL TRAINING ENVIRONMENT

    E-Print Network [OSTI]

    Aristomenis, Antoniadis

    for training modules to respond to the continuous evolution in the workplace so as to confront the problemVIRTUAL TRAINING CENTRE FOR SHOE DESIGN: A SAMPLE VIRTUAL TRAINING ENVIRONMENT Aura Mihai1 , Mehmet@tex.tuiasi.ro Abstract It is a fact that virtual training has become a key issue in training. There are numerous virtual

  14. Statistics and properties of HII regions in a sample of grand design galaxies I. Luminosity functions

    E-Print Network [OSTI]

    M. Rozas; J. E. Beckman; J. H. Knapen

    1995-09-11

    We present new high quality continuum-subtracted H alpha images of the grand-design galaxies NGC 157, NGC 3631, NGC 6764 and NGC 6951. We have determined the positions, angular sizes, and fluxes of their individual HII regions, and describe statistical properties of the HII region samples. We construct luminosity functions for all the HII regions in the disc and separately for arm and interarm zones for each galaxy. The slopes of the luminosity functions for the complete sample agree well with values published for other spiral galaxies of comparable morphological type. For three galaxies we determined the slopes of the luminosity functions for the spiral arm and interarm zones separately. We find that for NGC 157, NGC 3631, and NGC 6951 these slopes are equal within the errors of determination. We compare our results to those found from earlier work, specifically for M51 and NGC 6814, and discuss implications for massive star forming processes.

  15. Design of an Unattended Environmental Aerosol Sampling and Analysis System for Gaseous Centrifuge Enrichment Plants

    SciTech Connect (OSTI)

    Anheier, Norman C.; Munley, John T.; Alexander, M. L.

    2011-07-19

    The resources of the IAEA continue to be challenged by the rapid, worldwide expansion of nuclear energy production. Gaseous centrifuge enrichment plants (GCEPs) represent an especially formidable dilemma to the application of safeguard measures, as the size and enrichment capacity of GCEPs continue to escalate. During the early part of the 1990's, the IAEA began to lay the foundation to strengthen and make cost-effective its future safeguard regime. Measures under Part II of 'Programme 93+2' specifically sanctioned access to nuclear fuel production facilities and environmental sampling by IAEA inspectors. Today, the Additional Protocol grants inspection and environmental sample collection authority to IAEA inspectors at GCEPs during announced and low frequency unannounced (LFUA) inspections. During inspections, IAEA inspectors collect environmental swipe samples that are then shipped offsite to an analytical laboratory for enrichment assay. This approach has proven to be an effective deterrence to GCEP misuse, but this method has never achieved the timeliness of detection goals set forth by IAEA. Furthermore it is questionable whether the IAEA will have the resources to even maintain pace with the expansive production capacity of the modern GCEP, let alone improve the timeliness in reaching current safeguards conclusions. New safeguards propositions, outside of familiar mainstream safeguard measures, may therefore be required that counteract the changing landscape of nuclear energy fuel production. A new concept is proposed that offers rapid, cost effective GCEP misuse detection, without increasing LFUA inspection access or introducing intrusive access demands on GCEP operations. Our approach is based on continuous onsite aerosol collection and laser enrichment analysis. This approach mitigates many of the constraints imposed by the LFUA protocol, reduces the demand for onsite sample collection and offsite analysis, and overcomes current limitations associated with the in-facility misuse detection devices. Onsite environmental sample collection offers the ability to collect fleeting uranium hexafluoride emissions before they are lost to the ventilation system or before they disperse throughout the facility, to become deposited onto surfaces that are contaminated with background and historical production material. Onsite aerosol sample collection, combined with enrichment analysis, provides the unique ability to quickly detect stepwise enrichment level changes within the facility, leading to a significant strengthening of facility misuse deterence. We report in this paper our study of several GCEP environmental sample release scenarios and simulation results of a newly designed aerosol collection and particle capture system that is fully integrated with the Laser Ablation, Absorbance Ratio Spectrometry (LAARS) uranium particle enrichment analysis instrument that was developed at the Pacific Northwest National Laboratory.

  16. Sample Environments at Sector 30

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Designs Two standard sample holder designs are below. Copper sample holder from ARS. ARS sample holde diagram picture Aluminum sample holder - custom design Al design Al pic...

  17. KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES

    E-Print Network [OSTI]

    Greenhouses Institute for Astronomy University of Hawai`i Press Federal Credit Union Energy House & SafetyFREEWAY H1 KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES 2010 - 20112010 - 2011 Parking Services Office · 2600 Campus Road, Room 014 · Honolulu, HI 96822 · www.hawaii.edu/parking · parking

  18. Energy Audits and Retro-Commissioning: State and Local Policy Design Guide and Sample Policy Language

    SciTech Connect (OSTI)

    2013-07-29

    Provides guidance and sample policy language to help state and local governments enact and implement policies addressing energy assessments of or improvements to existing commercial buildings

  19. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the l...

  20. 29USDA Forest Service Gen. Tech. Rep. PSW-GTR-155. 1996. Statistical Considerations for Plot Design, Sampling Procedures, Analysis... Arbaugh and Bednar

    E-Print Network [OSTI]

    composition and exposure patterns will likely alter sample design and analysis needs for other forest types. 1996. Statistical Considerations for Plot Design, Sampling Procedures, Analysis... Arbaugh and Bednar29USDA Forest Service Gen. Tech. Rep. PSW-GTR-155. 1996. Statistical Considerations for Plot Design

  1. Research and Design of a Sample Heater for Beam Line 6-2c Transmission X-ray Microscope

    SciTech Connect (OSTI)

    Policht, Veronica; /Loyola U., Chicago /SLAC

    2012-08-27

    There exists a need for environmental control of samples to be imaged by the Transmission X-Ray Microscope (TXM) at the SSRLs Beam Line 6-2c. In order to observe heat-driven chemical or morphological changes that normally occur in situ, microscopes require an additional component that effectively heats a given sample without heating any of the microscope elements. The confinement of the heat and other concerns about the heaters integrity limit which type of heater is appropriate for the TXM. The bulk of this research project entails researching different heating methods used previously in microscopes, but also in other industrial applications, with the goal of determining the best-fitting method, and finally in designing a preliminary sample heater.

  2. Environmental Assessment for the Rathbun Lake Watershed: Sampling Design, Methods and Results

    E-Print Network [OSTI]

    Opsomer, Jean

    of water pollution. The most important non-point source pollution is thought to be soil loss from to water pollution in the watershed, a survey was designed to estimate the total amount of erosion water pollutants (e.g. livestock feedlots), made it possible to describe the most important impairments

  3. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  4. Fluid sampling apparatus and method

    DOE Patents [OSTI]

    Yeamans, D.R.

    1998-02-03

    Incorporation of a bellows in a sampling syringe eliminates ingress of contaminants, permits replication of amounts and compression of multiple sample injections, and enables remote sampling for off-site analysis. 3 figs.

  5. RCRA post-closure permits

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits (including treatment, storage, and disposal permits; research, development, and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits) are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  6. Sample Environments at Sector 30

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sample holder designs are below. Aluminum sample holder - custom design Al design Al pic click drawing for .pdf-file Aluminum sample holder - custom design Al design Al pic...

  7. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect (OSTI)

    Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

    1995-12-31

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  8. General Air Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

  9. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Municipalities and counties in Arizona may no longer require a stamp from a professional engineer to approve a solar system installation, which can raise the cost of a permit, unless such a...

  10. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  11. Hanford Facility RCRA permit handbook

    SciTech Connect (OSTI)

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  12. 1999 CBECS Sample Design

    U.S. Energy Information Administration (EIA) Indexed Site

    contractor for survey verification purposes only. Geographic identifiers and NOAA Weather Division identifiers are not included on micro-data files delivered to EIA....

  13. Appendix F. Air Permits Appendix F. Air Permits F-3

    E-Print Network [OSTI]

    Pennycook, Steve

    Appendix F. Air Permits #12;#12;Appendix F. Air Permits F-3 Table F.1. Air Permits at the Y-12 Chemical Process Operation 01-0020-21 554701 Air Bearing Operation 01-0020-05 554701 Special Processing Purification Facility #12;Oak Ridge Reservation F-4 Appendix F. Air Permits Table F.2. Oak Ridge National

  14. Sampling apparatus

    DOE Patents [OSTI]

    Gordon, N.R.; King, L.L.; Jackson, P.O.; Zulich, A.W.

    1989-07-18

    A sampling apparatus is provided for sampling substances from solid surfaces. The apparatus includes first and second elongated tubular bodies which telescopically and sealingly join relative to one another. An absorbent pad is mounted to the end of a rod which is slidably received through a passageway in the end of one of the joined bodies. The rod is preferably slidably and rotatably received through the passageway, yet provides a selective fluid tight seal relative thereto. A recess is formed in the rod. When the recess and passageway are positioned to be coincident, fluid is permitted to flow through the passageway and around the rod. The pad is preferably laterally orientable relative to the rod and foldably retractable to within one of the bodies. A solvent is provided for wetting of the pad and solubilizing or suspending the material being sampled from a particular surface. 15 figs.

  15. Well purge and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, Ronald (Kennewick, WA); Smith, Ronald M. (Richland, WA); Hall, Stephen H. (Kennewick, WA); Smart, John E. (Richland, WA); Gustafson, Gregg S. (Redmond, WA)

    1995-01-01

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly with a packer, pump and exhaust, that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. The packer is positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion.

  16. Well purge and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, R.; Smith, R.M.; Hall, S.H.; Smart, J.E.; Gustafson, G.S.

    1995-10-24

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly with a packer, pump and exhaust, that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. The packer is positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion. 8 figs.

  17. Permit application modifications

    SciTech Connect (OSTI)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  18. Environmental Permitting of a Low-BTU Coal Gasification Facility 

    E-Print Network [OSTI]

    Murawczyk, C.; Stewart, J. T.

    1983-01-01

    plan indicating the design of the landfill, description of the surface and subsurface hydrology and any unique environmental problems or constraints. A detailed plan of operation, closure and part closure activities had to also be prOVided as part... Quality Discharge Natural Resources Permit Solid Waste Permits Louisiana Department Solid Waste Landfill Con of Natural Resources, struction Permit Solid Waste Management Division Since the project was conceived as a modifica tion to an existing...

  19. Appendix E. Air Permits Appendix E. Air Permits E-3

    E-Print Network [OSTI]

    Pennycook, Steve

    Appendix E. Air Permits #12;#12;Appendix E. Air Permits E-3 Table E.1. Air permits at the Y-12 Chemical Process Operation 01-0020-21 554701 Air Bearing Operation 01-0020-05 554701 Special Processing Operation 01-0020-68 554701 Disassembly and Storage Operation #12;Oak Ridge Reservation E-4 Appendix E. Air

  20. Hawaii Application for Surface Water Use Permit for Proposed...

    Open Energy Info (EERE)

    Hawaii Application for Surface Water Use Permit for Proposed New Use in a Designated Surface Water Management Area (DLNR Form SWUPA-N) Jump to: navigation, search OpenEI Reference...

  1. Montana Water Quality Permit Application, Nondegradation Authorization...

    Open Energy Info (EERE)

    Montana Water Quality Permit Application, Nondegradation Authorization, and Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  2. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Construction Stormwater General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  3. Design Storm for Total Retention.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    endorse the viewpoint of a publication or guarantee its technical correctness. Title: Design Storm for "Total Retention" under Individual Permit, Poster, Individual Permit for...

  4. Regulatory and Permitting Issues

    SciTech Connect (OSTI)

    Larry Myer

    2005-12-01

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  5. Design and testing of a deep sea formation water and temeperature sampling probe for the Ocean Drilling Program 

    E-Print Network [OSTI]

    Fisseler, Patrick James

    1995-01-01

    between the formation and the probe. Favorable results of the sampling system allowed for the development of a new probe tip configuration, as well as, a new modularized electronics section. Machine drawings were generated for all components of the tool...

  6. Area temporarily closed for construction General Permit

    E-Print Network [OSTI]

    48 97 28 28 61 36 31 22 LOT L General Permit Parking LOT A General Permit Parking LOT C General Permit Parking LOT R Reserved Parking LOT D Faculty/Staff Parking LOT K General Permit Parking LOT J General Permit Parking Reserved Parking PV LOT General Parking after 3 p.m. LOT O General Permit Parking

  7. Solar Permit Application and Checklist

    Broader source: Energy.gov [DOE]

    This Photovoltaic System Application and Checklist may be used by any jurisdiction in the Kansas City area as a standardized document to be used by those seeking a solar system permit for residential or commercial photovoltaic systems under 15kW. The Application and Checklist clarifies the permitting steps for small solar systems and details the information and documentation that is required in the permit application.

  8. The Individual Permit for Stormwater

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Stormwater Eliminate contaminated stormwater discharges from specified Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) Use control measures called "best...

  9. MHWMF Part I Permit Modifications

    National Nuclear Security Administration (NNSA)

    stored on site under generator storage requirements until their disposal at off-site Resource Conservation and Recovery Act-permitted facilities or are treated at the KCP's...

  10. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1994-10-13

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  11. FISHING PERMIT Eastern Shore Agricultural

    E-Print Network [OSTI]

    FISHING PERMIT Eastern Shore Agricultural Research and Extension Center If all fields are not filled out, you do NOT have permission to fish! Name: ____________________________________________ Fishing Permit is valid for ONE YEAR. In return for this privilege, I agree to: 1. ABSOLVE the Eastern

  12. Flexibility Premium in Marketable Permits

    E-Print Network [OSTI]

    Macrina, Andrea

    for emission permits should attract those regulated companies with lower marginal costs for pollution abatement with lower marginal abatement costs to exploit the consequent price difference. 4 / 27 #12;Flexibility-emitting technology, modification of the production process, technology innovation); trading emission permits (spot

  13. Short torch design for direct liquid sample introduction using conventional and micro-nebulizers for plasma spectrometry

    DOE Patents [OSTI]

    Montaser, Akbar (Potomac, MD); Westphal, Craig S. (Landenberg, PA); Kahen, Kaveh (Montgomery Village, MD); Rutkowski, William F. (Arlington, VA)

    2008-01-08

    An apparatus and method for providing direct liquid sample introduction using a nebulizer are provided. The apparatus and method include a short torch having an inner tube and an outer tube, and an elongated adapter having a cavity for receiving the nebulizer and positioning a nozzle tip of the nebulizer a predetermined distance from a tip of the outer tube of the short torch. The predetermined distance is preferably about 2-5 mm.

  14. San Francisco's Streamlined Solar Permitting

    Broader source: Energy.gov [DOE]

    San Francisco’s solar permitting process—which allows permits for systems 4 kW and under to be applied for, approved, paid for, and issued online or in person over-the-counter—is one of the most efficient in the nation. This paper describes the process by which the City and County of San Francisco developed and implemented its streamlined solar permitting process, provides an update on San Francisco’s current e-permitting system, and outlines relevant lessons for other jurisdictions undertaking such work. This paper is structured as a resource for other jurisdictions to access best practices in streamlined permitting and learn from San Francisco’s experience.

  15. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  16. PARKINGSTRUCTURE1 FOUNDATION PERMIT

    E-Print Network [OSTI]

    Sorin, Eric J.

    ) Dance Center (F1) Design (H5) Earl Burns Miller Japanese Garden (B3) Education 1 (E9) Education 2 (E9 Center (F1) University Police (H3) University Print Shop (H3) University Student Union (F6) University) Engineering 2 (G4) Engineering 3 (G4) Engineering 4 (G4) Engineering / Computer Science (G4) Engineering

  17. Guidance manual for hazardous waste incinerator permits. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-07-01

    The manual provides guidance to the permit writer for designating facility - specific operating conditions necessary to comply with the RCRA standards for hazardous waste incinerators. Each section of the incineration regulation is addressed, including: waste analysis, designation of principal organic hazardous constituents and requirements for operation, inspection and monitoring. Guidance is also provided for evaluating incinerator performance data and trial burn procedures.

  18. Well fluid isolation and sample apparatus and method

    DOE Patents [OSTI]

    Schalla, Ronald (Kennewick, WA); Smith, Ronald M. (Richland, WA); Hall, Stephen H. (Kennewick, WA); Smart, John E. (Richland, WA)

    1995-01-01

    The present invention specifically permits purging and/or sampling of a well but only removing, at most, about 25% of the fluid volume compared to conventional methods and, at a minimum, removing none of the fluid volume from the well. The invention is an isolation assembly that is inserted into the well. The isolation assembly is designed so that only a volume of fluid between the outside diameter of the isolation assembly and the inside diameter of the well over a fluid column height from the bottom of the well to the top of the active portion (lower annulus) is removed. A seal may be positioned above the active portion thereby sealing the well and preventing any mixing or contamination of inlet fluid with fluid above the packer. Purged well fluid is stored in a riser above the packer. Ports in the wall of the isolation assembly permit purging and sampling of the lower annulus along the height of the active portion.

  19. Nevada Sample Application for Permit Under Utility Environmental Protection

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd JumpNesjavellirInformation ProceduresCivil Procedure

  20. Alaska Sample Special Area Permit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 -Telephone Co Jump to: navigation, searchAlaska

  1. Wind Access and Permitting Law

    Broader source: Energy.gov [DOE]

    The law also defines a limited set of reasonable restrictions that governments and associations are permitted to use in regulating residential wind energy systems. Any limitations put in place may...

  2. Solar Permitting & Inspection Webinar Series

    Office of Energy Efficiency and Renewable Energy (EERE)

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  3. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being submitted by the U.S. Department of Energy (DOE) and Washington TRU Solutions LLC (WTS), collectively referred to as the Permittees, in accordance with Permit Part 1.3.1...

  4. 200 area TEDF sample schedule

    SciTech Connect (OSTI)

    Brown, M.J.

    1995-03-22

    This document summarizes the sampling criteria associated with the 200 Area Treatment Effluent Facility (TEDF) that are needed to comply with the requirements of the Washington State Discharge Permit No. WA ST 4502 and good engineering practices at the generator streams that feed into TEDF. In addition, this document Identifies the responsible parties for both sampling and data transference.

  5. Washington Environmental Permit Handbook - Dangerous Waste Treatment...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Dangerous Waste Treatment Storage Disposal Facility New Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Web...

  6. Permit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking Privileges

    E-Print Network [OSTI]

    Chen, Tsuhan

    Privileges A (North Campus A Lot) Outer A lot on North Campus AP (Accessible Campus-wide Parking) ValidPermit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking in all permit-restricted parking spaces except reserved. Not valid in MT spaces. Must comply with posted

  7. Connecticut Rooftop Solar PV Permitting Guide

    Broader source: Energy.gov [DOE]

    The Connecticut Rooftop Solar PV Permitting Guide is a compilation of best practices and resources for solar PV permitting. The guide includes a summary of current codes and regulations affecting solar PV, best practices for streamlining the municipal permitting process, and tools to assist municipalities in creating a streamlined permit process for residential solar PV. Resources include a solar PV permit application, a structural review worksheet, an inspection checklist, and a model solar zoning ordinance.

  8. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program, under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single,...

  9. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/OPerformance and Debugging ToolsEdison Performance

  10. DRAFT - Design of Radiological Survey and Sampling to Support Title Transfer or Lease of Property on the Department of Energy Oak Ridge Reservation

    SciTech Connect (OSTI)

    Cusick L.T.

    2002-09-25

    The U.S. Department of Energy (DOE) owns, operates, and manages the buildings and land areas on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. As land and buildings are declared excess or underutilized, it is the intent of DOE to either transfer the title of or lease suitable property to the Community Reuse Organization of East Tennessee (CROET) or other entities for public use. It is DOE's responsibility, in coordination with the U.S. Environmental Protection Agency (EPA), Region 4, and the Tennessee Department of Environment and Conservation (TDEC), to ensure that the land, facilities, and personal property that are to have the title transferred or are to be leased are suitable for public use. Release of personal property must also meet site requirements and be approved by the DOE contractor responsible for site radiological control. The terms title transfer and lease in this document have unique meanings. Title transfer will result in release of ownership without any restriction or further control by DOE. Under lease conditions, the government retains ownership of the property along with the responsibility to oversee property utilization. This includes involvement in the lessee's health, safety, and radiological control plans and conduct of site inspections. It may also entail lease restrictions, such as limiting access to certain areas or prohibiting digging, drilling, or disturbing material under surface coatings. Survey and sampling requirements are generally more rigorous for title transfer than for lease. Because of the accelerated clean up process, there is an increasing emphasis on title transfers of facilities and land. The purpose of this document is to describe the radiological survey and sampling protocols that are being used for assessing the radiological conditions and characteristics of building and land areas on the Oak Ridge Reservation that contain space potentially available for title transfer or lease. After necessary surveys and sampling and laboratory analyses are completed, the data are analyzed and included in an Environmental Baseline Summary (EBS) report for title transfer or in a Baseline Environmental Analysis Report (BEAR) for lease. The data from the BEAR is then used in a Screening-Level Human Health Risk Assessment (SHHRA) or a risk calculation (RC) to assess the potential risks to future owners/occupants. If title is to be transferred, release criteria in the form of specific activity concentrations called Derived Concentration Guideline Levels (DCGLs) will be developed for the each property. The DCGLs are based on the risk model and are used with the data in the EBS to determine, with statistical confidence, that the release criteria for the property have been met. The goal of the survey and sampling efforts is to (1) document the baseline conditions of the property (real or personal) prior to title transfer or lease, (2) obtain enough information that an evaluation of radiological risks can be made, and (3) collect sufftcient data so that areas that contain minimal residual levels of radioactivity can be identified and, following radiological control procedures, be released from radiological control. (It should be noted that release from radiological control does not necessarily mean free release because DOE may maintain institutional control of the site after it is released from radiological control). To meet the goals of this document, a Data Quality Objective (DQO) process will be used to enhance data collection efficiency and assist with decision-making. The steps of the DQO process involve stating the problem, identifying the decision, identifying inputs to the decision, developing study boundaries, developing the decision rule, and optimizing the design. This document describes the DQOs chosen for surveys and sampling efforts performed for the purposes listed above. The previous version to this document focused on the requirements for radiological survey and sampling protocols that are be used for leasing. Because the primary focus at this time is on title transfer, th

  11. Facing Title V permit constraints

    SciTech Connect (OSTI)

    Patankar, U.M. [JACA Corp., Fort Washington, PA (United States)

    1995-06-01

    The new Title V operating permit requirement under state regulations pursuant to the 1990 Clean Air Act Amendments will cover every emission source at a facility. These rules will significantly affect an operation by setting minimum compliance requirements, mandating periodic compliance certification, prescribing complex monitoring, record keeping and reporting procedures and making state and EPA approval of routine operational changes necessary through a permit amendment. The main concern with Title V is its effect on the operational flexibility of a facility, and individual emission sources within that facility. Unless properly addressed in a permit document, the term operational flexibility, so freely used by regulators in the context of the Title V program, can turn into a misnomer and the ability to operate as before may be significantly compromised under Title V. True operational flexibility is essential for businesses to respond to real changes in the marketplace. In the age of automation, just-in-time inventories and increased competition, flexibility to operate can mean the difference between growth and stagnation.

  12. Construction Permits and Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

  13. Market Power in Pollution Permit Markets

    E-Print Network [OSTI]

    Montero, Juan Pablo

    As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

  14. Air Permitting for Stationary Sources (New Hampshire)

    Broader source: Energy.gov [DOE]

    The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

  15. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  16. California Solar Permitting Guidebook, Second Edition

    Broader source: Energy.gov [DOE]

    The California Solar Permitting Guidebook is a resource for local governments and permitting agencies to facilitate installation of small solar energy systems. By adopting its recommendations, local governments can reduce permit processing times and increase their output while facilitating local economic development.

  17. Solar Photovoltaic (PV) System Permit Application Checklist

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  18. Sample Proficiency Test exercise

    SciTech Connect (OSTI)

    Alcaraz, A; Gregg, H; Koester, C

    2006-02-05

    The current format of the OPCW proficiency tests has multiple sets of 2 samples sent to an analysis laboratory. In each sample set, one is identified as a sample, the other as a blank. This method of conducting proficiency tests differs from how an OPCW designated laboratory would receive authentic samples (a set of three containers, each not identified, consisting of the authentic sample, a control sample, and a blank sample). This exercise was designed to test the reporting if the proficiency tests were to be conducted. As such, this is not an official OPCW proficiency test, and the attached report is one method by which LLNL might report their analyses under a more realistic testing scheme. Therefore, the title on the report ''Report of the Umpteenth Official OPCW Proficiency Test'' is meaningless, and provides a bit of whimsy for the analyses and readers of the report.

  19. Federal Environmental Permitting Handbook. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  20. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  1. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  2. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

    SciTech Connect (OSTI)

    Marutzky, Sam; Farnham, Irene

    2014-10-01

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

  3. Permit Fees for Hazardous Waste Material Management (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

  4. Wastewater Construction and Operation Permits (Iowa)

    Broader source: Energy.gov [DOE]

    These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

  5. Oregon Water Quality Permit Program (Stormwater - Industrial...

    Open Energy Info (EERE)

    Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality...

  6. Presidential Permits and Export Authorizations - Frequently Asked...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    they? Permits for the construction, connection, operation andor maintenance of electric transmission lines that cross the U.S. international border. What are the criteria? Two...

  7. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  8. Disclosure of Permitted Communication Concerning Regional Standards...

    Broader source: Energy.gov (indexed) [DOE]

    furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

  9. Air Permits, Licenses, Certifications (Maine) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program....

  10. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs) Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  11. Washington Environmental Permit Handbook - Underground Injection...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Underground Injection Control Registration webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  12. Los Alamos National Laboratory Environmental Permits Update

    Broader source: Energy.gov [DOE]

    At the January 29, 2014 Board meeting Tony Grieggs LANL, Provided Information on the Environmental Permit Status and the LANL Sites that they Cover.

  13. Trading quasi-emission permits

    E-Print Network [OSTI]

    Montero, Juan-Pablo

    2002-01-01

    I study the design of environmental policies for a regulator that has incomplete information on firms' emissions and costs of production and abatement (e.g., air pollution in cities with numerous small polluting sources). ...

  14. CAMP PARKING PERMIT VALID LOT G ONLY

    E-Print Network [OSTI]

    Burg, Theresa

    PERMIT No. SUMMER CAMP PARKING PERMIT VALID LOT G ONLY (REFER TO SIGNS IN PARKING LOT TO ENSURE RD. Aperture Lake LOT F LOT FS LOT J LOT N LOT C University Day Care The Quad Summer Camp Parking Lot PROPER USE) VALID FROM: JUNE 29, 2015 TO: AUG 28, 2015 VALID ONLY DURING TIMES BELOW PARKING ANYWHERE

  15. Solar PV Permitting and Safety Training Webinar

    Broader source: Energy.gov [DOE]

    This webinar provides training on two permitting resources for municipal inspectors; a prescriptive process for building inspectors and a guidance document for permitting for PV for electrical inspectors. The webinar also runs through a number of key code articles in Massachusetts 2014 electrical code and examines a variety of safety hazards commonly found during or after solar PV installations.

  16. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  17. Sample push-out fixture

    DOE Patents [OSTI]

    Biernat, John L. (Scotia, NY)

    2002-11-05

    This invention generally relates to the remote removal of pelletized samples from cylindrical containment capsules. V-blocks are used to receive the samples and provide guidance to push out rods. Stainless steel liners fit into the v-channels on the v-blocks which permits them to be remotely removed and replaced or cleaned to prevent cross contamination between capsules and samples. A capsule holder securely holds the capsule while allowing manual up/down and in/out movement to align each sample hole with the v-blocks. Both end sections contain identical v-blocks; one that guides the drive out screw and rods or manual push out rods and the other to receive the samples as they are driven out of the capsule.

  18. 400 area secondary cooling water sampling and analysis plan

    SciTech Connect (OSTI)

    Penn, L.L.

    1996-10-29

    This is a total rewrite of the Sampling and Analysis Plan in response to, and to ensure compliance with, the State Waste Discharge Permit ST 4501 issued on July 31, 1996. This revision describes changes in facility status and implements requirements of the permit.

  19. RCRA post-closure permits. RCRA Information Brief

    SciTech Connect (OSTI)

    Coalgate, J.

    1993-02-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits, including treatment,storage, and disposal permits; research, development and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  20. Spectroelectrochemical Sensing Based on Multimode Selectivity Simultaneously Achievable in a Single Device. 11. Design and Evaluation of a Small Portable Sensor for the Determination of Ferrocyanide in Hanford Waste Samples.

    SciTech Connect (OSTI)

    Stegemiller, Michael L.; Heineman, William R.; Seliskar, Carl J.; Ridgeway, Thomas H.; Bryan, Samuel A.; Hubler, Timothy L.; Sell, Rachel L.

    2003-01-01

    A portable spectroelectrochemical sensor has been designed, evaluated, and demonstrated on a complex sample of radioactive waste. The sensor consisted of a black delrin sample compartment with a total internal sample volume of 800 ?L, attached to an indium tin oxide coated glass multiple internal reflection optical element. Detection was by total internal reflection of light from a blue light emitting diode source. After a 10 min uptake for each standard, the sensor showed a linear response in absorbance change for 5 x 10-5 to 5 x 10-3 M ferrocyanide with electrochemical modulation by scanning at 25 mV/s from ? 0.30 V to + 0.55 V vs. a Ag/AgCl reference electrode. Due to the complex nature of Hanford radioactive tank waste samples containing ferrocyanide, a standard addition method was developed for analysis. The spectroelectrochemical sensor determined a concentration of 9.2 mM ferrocyanide for U-Plant-2 simulant solution containing 9.38 mM ferrocyanide that was prepared according to Hanford process flowsheets. A radioactive tank waste sample from Hanford Tank 241-C-112 was determined to be 1.0 mM in ferrocyanide using the spectroelectrochemical sensor. The accepted value for ferrocyanide concentration in the sample is 0.61 mM as determined by IR spectroscopy.

  1. May 4, 2015 Summer parking permits are now available.

    E-Print Network [OSTI]

    Fairfax Resident Lite permit: $110 *Fairfax Lot M/P: $60 Mason Pond & Shenandoah reserved parking deckContent May 4, 2015 Summer parking permits are now available. Arlington General permit permit: $185 *Rappahannock River reserved parking deck/garage permit: $145 Founders Hall reserved parking

  2. Sampling box

    DOE Patents [OSTI]

    Phillips, Terrance D. (617 Chestnut Ct., Aiken, SC 29803); Johnson, Craig (100 Midland Rd., Oak Ridge, TN 37831-0895)

    2000-01-01

    An air sampling box that uses a slidable filter tray and a removable filter cartridge to allow for the easy replacement of a filter which catches radioactive particles is disclosed.

  3. Colorado - Access Permit Pre-Design Checklist | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (Utility Company) JumpIowa:Colmar, Pennsylvania:Information

  4. Sample introduction apparatus for a flow cytometer

    DOE Patents [OSTI]

    Van den Engh, Ger (Seattle, WA)

    1998-01-01

    A sample introduction system for a flow cytometer allows easy change of sample containers such as test tubes and facilitates use in high pressure environments. The sample container includes a cap having a pressure supply chamber and a sample container attachment cavity. A sample container may be automatically positioned into the attachment cavity so as to sealably engage the end of the sample container as its outer surface. This positioning may be accomplished through some sample introduction mechanism. To facilitate cleaning HPLC tubing and fittings may be used in a manner which facilitates removable of the entire tubing from both the nozzle container and other sample container cap to permit its replacement to avoid contamination. The sample container support may include horizontal stops which loosely limit the movement of the sample container and thus avoid further stresses upon it.

  5. Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program

    SciTech Connect (OSTI)

    Goldstein, D.R.; Cressman, A.W.

    1999-07-01

    Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

  6. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  7. Disclosure of Permitted Communication Concerning Fossil Fuel...

    Energy Savers [EERE]

    Fossil Fuel Energy Consumption Reduction for New Construction and Major Renovations of Federal Buildings -- Docket No. EERE-2010-BT-STD-0031; RIN 1904-AB96 Disclosure of Permitted...

  8. City of Asheville- Building Permit Fee Waiver

    Broader source: Energy.gov [DOE]

    The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  9. Energy Permitting Wizard Helps Reduce Project Barriers in Hawai...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Permitting Wizard Helps Reduce Project Barriers in Hawai'i Energy Permitting Wizard Helps Reduce Project Barriers in Hawai'i To address the complex permitting process for renewable...

  10. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect (OSTI)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  11. Abatement of Air Pollution: Permit to Construct and Operate Stationary...

    Broader source: Energy.gov (indexed) [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

  12. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  13. Application for Presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from...

  14. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy...

  15. Application for Presidential Permit OE Docket No. PP-394 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  16. Application for Presidential Permit OE Docket No. PP-397 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  17. Application for Presidential Permit OE Docket No. PP-395 Emera...

    Energy Savers [EERE]

    to rescind Presidential Permit held by Maine Public and issue a permit to Bangor Hydro under its new name, Emera Maine covering the same international transmission...

  18. V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validation Flaw Permits Cross-Site Scripting Attacks T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks...

  19. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for general construction. Published NA...

  20. The Waste Isolation Pilot Plant Hazardous Waste Facility Permit...

    Office of Environmental Management (EM)

    The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan This...

  1. Application Submittal Guidance for Stormwater Permits andPost...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Application Submittal Guidance for Stormwater Permits and Post-Authorization...

  2. U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

  3. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:...

  4. Source Water and Groundwater Withdrawal Permit Application Process...

    Open Energy Info (EERE)

    Source Water and Groundwater Withdrawal Permit Application Process Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  5. Oregon Directive for NPDES Permits and Section 401 Water Quality...

    Open Energy Info (EERE)

    Directive for NPDES Permits and Section 401 Water Quality Certifications Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  6. ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

  7. ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

  8. Hanford facility dangerous waste permit application

    SciTech Connect (OSTI)

    none,

    1991-09-18

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  9. Selected Parking Types Resident Parking,Permit Required

    E-Print Network [OSTI]

    Chen, Tsuhan

    Lot Night/Weekend Restricted Permit Area 10 Minute Parking,No Permit Required Parkmobile Pay-by-Cell Parking Lot North Campus B Lot Sage Hall Campus-to-Campus Stops A B C ©2013This map replaces previous Selected Parking Types Resident Parking,Permit Required Commuter Parking,Permit Required Metered Parking

  10. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    SciTech Connect (OSTI)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  11. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    SciTech Connect (OSTI)

    Not Available

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  12. FNR 3410C Natural Resource Sampling FNR 3410C -NATURAL RESOURCE SAMPLING

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    of sampling. Design of cost-effective sample surveys. Sampling methodology applicable 0211 (Mechanical & Aerospace Engineering) Lab 1 Period 7-9 13:55-16:55 M BLK begins with a review of elementary statistics and continues with specific

  13. UC Berkeley Welding/Cutting Permit

    E-Print Network [OSTI]

    Cohen, Ronald C.

    #12;#12;UC Berkeley Welding/Cutting Permit MUST BE POSTED ON SITE All equipment to be used for welding or cutting has been inspected and approved. All personnel (including supervisors) are trained, or protected by fire-resistant shields. (Where floors have been wet down, personnel operating arc welding

  14. Microsoft Word - Permit Table of Contents 2-2014 (2).docx

    Office of Environmental Management (EM)

    Table of Contents February 2014 WIPP Permit - Table of Contents PART 1 - GENERAL PERMIT CONDITIONS ... 1...

  15. Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)

    Broader source: Energy.gov [DOE]

    The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

  16. Tradable Permits with Incomplete Monitoring: Evidence from Santiago’s Particulate Permits Program

    E-Print Network [OSTI]

    Montero, Juan-Pablo

    2006-03-14

    I explore the advantages of tradable emission permits over uniform emission standards when the regulator has incomplete information on firms’ emissions and costs of production and abatement (e.g., air pollution in large cities). Because...

  17. Fluid sampling system

    DOE Patents [OSTI]

    Houck, Edward D. (Idaho Falls, ID)

    1994-01-01

    An fluid sampling system allows sampling of radioactive liquid without spillage. A feed tank is connected to a liquid transfer jet powered by a pumping chamber pressurized by compressed air. The liquid is pumped upwardly into a sampling jet of a venturi design having a lumen with an inlet, an outlet, a constricted middle portion, and a port located above the constricted middle portion. The liquid is passed under pressure through the constricted portion causing its velocity to increase and its pressure to decreased, thereby preventing liquid from escaping. A septum sealing the port can be pierced by a two pointed hollow needle leading into a sample bottle also sealed by a pierceable septum affixed to one end. The bottle is evacuated by flow through the sample jet, cyclic variation in the sampler jet pressure periodically leaves the evacuated bottle with lower pressure than that of the port, thus causing solution to pass into the bottle. The remaining solution in the system is returned to the feed tank via a holding tank.

  18. Fluid sampling system

    DOE Patents [OSTI]

    Houck, E.D.

    1994-10-11

    An fluid sampling system allows sampling of radioactive liquid without spillage. A feed tank is connected to a liquid transfer jet powered by a pumping chamber pressurized by compressed air. The liquid is pumped upwardly into a sampling jet of a venturi design having a lumen with an inlet, an outlet, a constricted middle portion, and a port located above the constricted middle portion. The liquid is passed under pressure through the constricted portion causing its velocity to increase and its pressure to be decreased, thereby preventing liquid from escaping. A septum sealing the port can be pierced by a two pointed hollow needle leading into a sample bottle also sealed by a pierceable septum affixed to one end. The bottle is evacuated by flow through the sample jet, cyclic variation in the sampler jet pressure periodically leaves the evacuated bottle with lower pressure than that of the port, thus causing solution to pass into the bottle. The remaining solution in the system is returned to the feed tank via a holding tank. 4 figs.

  19. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  20. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  1. Quantum rejection sampling

    E-Print Network [OSTI]

    Maris Ozols; Martin Roetteler; Jérémie Roland

    2011-12-13

    Rejection sampling is a well-known method to sample from a target distribution, given the ability to sample from a given distribution. The method has been first formalized by von Neumann (1951) and has many applications in classical computing. We define a quantum analogue of rejection sampling: given a black box producing a coherent superposition of (possibly unknown) quantum states with some amplitudes, the problem is to prepare a coherent superposition of the same states, albeit with different target amplitudes. The main result of this paper is a tight characterization of the query complexity of this quantum state generation problem. We exhibit an algorithm, which we call quantum rejection sampling, and analyze its cost using semidefinite programming. Our proof of a matching lower bound is based on the automorphism principle which allows to symmetrize any algorithm over the automorphism group of the problem. Our main technical innovation is an extension of the automorphism principle to continuous groups that arise for quantum state generation problems where the oracle encodes unknown quantum states, instead of just classical data. Furthermore, we illustrate how quantum rejection sampling may be used as a primitive in designing quantum algorithms, by providing three different applications. We first show that it was implicitly used in the quantum algorithm for linear systems of equations by Harrow, Hassidim and Lloyd. Secondly, we show that it can be used to speed up the main step in the quantum Metropolis sampling algorithm by Temme et al.. Finally, we derive a new quantum algorithm for the hidden shift problem of an arbitrary Boolean function and relate its query complexity to "water-filling" of the Fourier spectrum.

  2. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  3. Westinghouse and Fuzhou Permitted to Restart Distribution of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Fuzhou Permitted to Restart Distribution of Light Bulb Products Westinghouse and Fuzhou Permitted to Restart Distribution of Light Bulb Products August 6, 2010 - 4:26pm Addthis...

  4. UPDES General Permit for Discharges from Construction Activities...

    Open Energy Info (EERE)

    from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit for...

  5. Exclusionary manipulation of carbon permit markets: a laboratory test

    E-Print Network [OSTI]

    Carlén, Björn.

    The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

  6. SolarTech: Sun Sets on Yesterday's Solar Permitting Practices...

    Office of Environmental Management (EM)

    SolarTech: Sun Sets on Yesterday's Solar Permitting Practices SolarTech: Sun Sets on Yesterday's Solar Permitting Practices October 1, 2012 - 3:26pm Addthis Lengthy reviews, high...

  7. Vermont Permit and License Information, Work in a State Highway...

    Open Energy Info (EERE)

    Vermont Permit and License Information, Work in a State Highway Right of Way Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  8. City and County of Denver- Solar Panel Permitting

    Office of Energy Efficiency and Renewable Energy (EERE)

    Denver provides same-day permit review for most solar panel projects. Electrical, Plumbing, and Zoning Permits* are required for photovoltaic (PV) systems installed in the city of Denver, althoug...

  9. Low-level waste vitrification plant environmental permitting plan

    SciTech Connect (OSTI)

    Gretsinger, W.T.; Colby, J.M.

    1994-10-03

    This document presents projected environmental permitting and approval requirements for the treatment and disposal of low-level Hanford tank waste by vitrification. Applicability, current status, and strategy are discussed for each potential environmental permit or approval.

  10. WIPP Hazardous Waste Facility Permit - 2008 Update

    SciTech Connect (OSTI)

    Kehrman, R.F.; Most, W.A.

    2008-07-01

    Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

  11. On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish) 

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30

    This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

  12. Innovation and Success in Solar Permitting and Inspection

    Broader source: Energy.gov [DOE]

    This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

  13. Defining And Characterizing Sample Representativeness For DWPF Melter Feed Samples

    SciTech Connect (OSTI)

    Shine, E. P.; Poirier, M. R.

    2013-10-29

    Representative sampling is important throughout the Defense Waste Processing Facility (DWPF) process, and the demonstrated success of the DWPF process to achieve glass product quality over the past two decades is a direct result of the quality of information obtained from the process. The objective of this report was to present sampling methods that the Savannah River Site (SRS) used to qualify waste being dispositioned at the DWPF. The goal was to emphasize the methodology, not a list of outcomes from those studies. This methodology includes proven methods for taking representative samples, the use of controlled analytical methods, and data interpretation and reporting that considers the uncertainty of all error sources. Numerous sampling studies were conducted during the development of the DWPF process and still continue to be performed in order to evaluate options for process improvement. Study designs were based on use of statistical tools applicable to the determination of uncertainties associated with the data needs. Successful designs are apt to be repeated, so this report chose only to include prototypic case studies that typify the characteristics of frequently used designs. Case studies have been presented for studying in-tank homogeneity, evaluating the suitability of sampler systems, determining factors that affect mixing and sampling, comparing the final waste glass product chemical composition and durability to that of the glass pour stream sample and other samples from process vessels, and assessing the uniformity of the chemical composition in the waste glass product. Many of these studies efficiently addressed more than one of these areas of concern associated with demonstrating sample representativeness and provide examples of statistical tools in use for DWPF. The time when many of these designs were implemented was in an age when the sampling ideas of Pierre Gy were not as widespread as they are today. Nonetheless, the engineers and statisticians used carefully thought out designs that systematically and economically provided plans for data collection from the DWPF process. Key shared features of the sampling designs used at DWPF and the Gy sampling methodology were the specification of a standard for sample representativeness, an investigation that produced data from the process to study the sampling function, and a decision framework used to assess whether the specification was met based on the data. Without going into detail with regard to the seven errors identified by Pierre Gy, as excellent summaries are readily available such as Pitard [1989] and Smith [2001], SRS engineers understood, for example, that samplers can be biased (Gy?s extraction error), and developed plans to mitigate those biases. Experiments that compared installed samplers with more representative samples obtained directly from the tank may not have resulted in systematically partitioning sampling errors into the now well-known error categories of Gy, but did provide overall information on the suitability of sampling systems. Most of the designs in this report are related to the DWPF vessels, not the large SRS Tank Farm tanks. Samples from the DWPF Slurry Mix Evaporator (SME), which contains the feed to the DWPF melter, are characterized using standardized analytical methods with known uncertainty. The analytical error is combined with the established error from sampling and processing in DWPF to determine the melter feed composition. This composition is used with the known uncertainty of the models in the Product Composition Control System (PCCS) to ensure that the wasteform that is produced is comfortably within the acceptable processing and product performance region. Having the advantage of many years of processing that meets the waste glass product acceptance criteria, the DWPF process has provided a considerable amount of data about itself in addition to the data from many special studies. Demonstrating representative sampling directly from the large Tank Farm tanks is a difficult, if not unsolvable enterprise due to li

  14. 200 Area Treated Effluent Disposal Facility (TEDF) Effluent Sampling and Analysis Plan

    SciTech Connect (OSTI)

    BROWN, M.J.

    2000-05-18

    This Sampling and Analysis Plan (SAP) has been developed to comply with effluent monitoring requirements at the 200 Area Treated Effluent Disposal Facility (TEDF), as stated in Washington State Waste Discharge Permit No. ST 4502 (Ecology 2000). This permit, issued by the Washington State Department of Ecology (Ecology) under the authority of Chapter 90.48 Revised Code of Washington (RCW) and Washington Administrative Code (WAC) Chapter 173-216, is an April 2000 renewal of the original permit issued on April 1995.

  15. Germanium-76 Sample Analysis

    SciTech Connect (OSTI)

    Kouzes, Richard T.; Engelhard, Mark H.; Zhu, Zihua

    2011-04-01

    The MAJORANA DEMONSTRATOR is a large array of ultra-low background high-purity germanium detectors, enriched in 76Ge, designed to search for zero-neutrino double-beta decay (0???). The DEMONSTRATOR will utilize 76Ge from Russia, and the first one gram sample was received from the supplier for analysis on April 24, 2011. The Environmental Molecular Sciences facility, a DOE user facility at PNNL, was used to make the required isotopic and chemical purity measurements that are essential to the quality assurance for the MAJORANA DEMONSTRATOR. The results of this first analysis are reported here.

  16. Method and apparatus for imaging a sample on a device

    DOE Patents [OSTI]

    Trulson, Mark (Santa Clara, CA); Stern, David (Mountain View, CA); Fiekowsky, Peter (Los Altos, CA); Rava, Richard (Palo Alto, CA); Walton, Ian (Menlo Park, CA); Fodor, Stephen P. A. (Palo Alto, CA)

    2001-01-01

    A method and apparatus for imaging a sample are provided. An electromagnetic radiation source generates excitation radiation which is sized by excitation optics to a line. The line is directed at a sample resting on a support and excites a plurality of regions on the sample. Collection optics collect response radiation reflected from the sample I and image the reflected radiation. A detector senses the reflected radiation and is positioned to permit discrimination between radiation reflected from a certain focal plane in the sample and certain other planes within the sample.

  17. PERMITTING LEADERSHIP IN THE UNITED STATES

    SciTech Connect (OSTI)

    Ken Nemeth

    2002-09-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

  18. Groundwater Withdrawal Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar JumpInformation Crump's HotClimatePermit

  19. Montana 310 Permit Database | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec(Pritchett, 2004)Michigan: EnergyNew0 Permit Database Jump

  20. Permit by Rule Guide | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio ProgramInformation 9thPerformance-BasedPerma Works JumpPermit

  1. Presidential Permits - Procedures | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidential

  2. Permit Allocation in Emissions Trading using the Boltzmann Distribution

    E-Print Network [OSTI]

    Park, Ji-Won; Isard, Walter

    2011-01-01

    In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

  3. 200 Area TEDF effluent sampling and analysis plan

    SciTech Connect (OSTI)

    Alaconis, W.C.; Ballantyne, N.A.; Boom, R.J. [and others

    1995-06-01

    This sampling analysis sets forth the effluent sampling requirements, analytical methods, statistical analyses, and reporting requirements to satisfy the State Waste Discharge Permit No. ST4502 for the Treated Effluent Disposal Facility. These requirements are listed below: Determine the variability in the effluent of all constituents for which enforcement limits, early warning values and monitoring requirements; demonstrate compliance with the permit; and verify that BAT/AKART (Best Available Technology/All know and Reasonable Treatment) source, treatment, and technology controls are being met.

  4. Geothermal policy development program: expediting the local geothermal permitting process

    SciTech Connect (OSTI)

    Not Available

    1981-07-01

    For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

  5. Clark County- Solar and Wind Building Permit Guides

    Broader source: Energy.gov [DOE]

    Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

  6. City of Portland- Streamlined Building Permits for Residential Solar Systems

    Broader source: Energy.gov [DOE]

    The City of Portland's Bureau of Development Services (BDS) developed a streamlined permitting process for residential solar energy system installations. The City of Portland has staff at the...

  7. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Energy Savers [EERE]

    Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application from...

  9. Application for Presidential Permit OE Docket No: PP-371 Northern...

    Office of Environmental Management (EM)

    OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  10. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments from Stephen Buzzell and Lelah Sullivan Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy...

  11. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Pass Transmission: Comments from Linda Upham Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy...

  12. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application from Northern Pass to construct, operate and maintain...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission:...

  14. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    relocate an access connection to state ROWs. Published NA Year Signed or Took Effect 2000 Legal Citation Application for Permit to Construct Access Driveway Facilities on...

  15. Permit for Charging Equipment Installation: Electric Vehicle Supply Equipment (EVSE)

    Broader source: Energy.gov [DOE]

    Jurisdiction's can use this template to develop a standard permit for residential charging stations that allows for quick, safe installation of EVSE.

  16. Nevada Industrial Solid Waste Disposal Site Permit Application...

    Open Energy Info (EERE)

    Nevada Industrial Solid Waste Disposal Site Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Nevada Industrial Solid Waste Disposal Site...

  17. File:CDPHE Industrial Individual Wastewater Discharge Permit...

    Open Energy Info (EERE)

    Help Apps Datasets Community Login | Sign Up Search File Edit History File:CDPHE Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search...

  18. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

  19. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    87 Soule Hydro: Comments from Senator Lisa Murkowski Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Senator Lisa Murkowski Application from...

  20. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

  1. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dept. of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture Application from Soule Hydro to construct, operate and...

  2. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Environmental Management (EM)

    Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture...

  3. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and maintain electric...

  4. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    S - Canada Border. Federal Register Notice. PP-387 Soule Hydro FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments...

  5. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

  6. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

  7. Application for presidential permit OE Docket No. PP-300 Maine...

    Broader source: Energy.gov (indexed) [DOE]

    Applicationfrom Maine Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE...

  8. Coordination of Federal Transmission Permitting on Federal Lands...

    Energy Savers [EERE]

    federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land. The MOU will improve uniformity,...

  9. Application for presidential permit OE Docket No. PP-334 Energia...

    Energy Savers [EERE]

    Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement. Application for presidential permit OE Docket No. PP-334 Energia Sierra...

  10. Application for presidential permit OE Docket No. PP-334 Energia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application for presidential permit OE Docket No. PP-334...

  11. V-153: Symantec Brightmail Gateway Input Validation Flaw Permits...

    Broader source: Energy.gov (indexed) [DOE]

    T-701: Citrix Access Gateway Enterprise Edition Input Validation Flaw in Logon Portal Permits Cross-Site Scripting Attacks U-001:Symantec IM Manager Input Validation Flaws...

  12. Model operating permits for natural gas processing plants

    SciTech Connect (OSTI)

    Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

    1995-12-31

    Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

  13. Los Alamos National Laboratory Hazardous Waste Facility Permit...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hazardous Waste Facility Permit Draft Community Relations Plan CommentSuggestion Form Instructions for completing the form: Please reference the section in the plan that your...

  14. Application for Presidential Permit OE Docket No. PP-059 Central...

    Energy Savers [EERE]

    (CPL) to construct, operate and maintain electric transmission facilities at the U.S. - Mexico Border Application for Presidential Permit OE Docket No. PP-59 Central Power and...

  15. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Energy Savers [EERE]

    98 Minnesota Power - Great Northern Transmission Line Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line Response letter...

  16. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    Montana Ground Water Pollution Control System Permit Application Forms Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water...

  17. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

  18. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-305...

  19. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    Scope Change 1 PP-305 Montana Alberta Tie LTD More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update...

  20. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application from Soule Hydro to...

  1. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the DOE point of contact and program Web site. Federal Register Notice. PP-387 Soule Hydro FRN Correction.pdf More Documents & Publications Application for Presidential Permit...

  2. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct,...

  3. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and...

  4. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydro, LLC Application for Presidential Permit OE Docket No. PP-387 Soule Hydro, LLC Application from Soule Hydro to construct, operate and maintain electric transmission...

  5. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination of Project Costs Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  6. Presidential Permits and Export Authorizations - About the Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    transmission lines which cross the U.S. international border; and 2.Authorizing exports of electric energy to foreign countries. The authority to grant Presidential permits...

  7. Notice of Termination for Authorization under TPDES General Permit...

    Open Energy Info (EERE)

    Termination for Authorization under TPDES General Permit (TXR150000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Reference: Notice of Termination for...

  8. Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)

    SciTech Connect (OSTI)

    Young, K.

    2014-04-01

    Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

  9. Application for presidential permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons...

  10. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Office of Environmental Management (EM)

    - New England Clean Power Link Project - Motion to Intervene and Comments of the Vermont Department of Public Service - August 6, 2014 Application for Presidential Permit OE...

  11. OAR 340-120 - Additional Siting and Permitting Requirements for...

    Open Energy Info (EERE)

    Page Edit with form History OAR 340-120 - Additional Siting and Permitting Requirements for Hazardous Waste and PCB Treatment and Disposal Facilities Jump to: navigation, search...

  12. Application for a Colorado State Permit for Achaeological or...

    Open Energy Info (EERE)

    Provided, 92011 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Application for a Colorado State Permit for Achaeological or...

  13. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

  14. Application for Presidential Permit OE Docket No. PP-235 Sempra...

    Energy Savers [EERE]

    35 Sempra Energy Resources. Application for Presidential Permit OE Docket No. PP-235 Sempra Energy Resources. Application from Sempra Energy Resources to construct, operate and...

  15. Presidential Permits and Export Authorizations - About the Program...

    Office of Environmental Management (EM)

    electric energy to foreign countries. The authority to grant Presidential permits is derived from the constitutional power of the President to protect the territorial integrity...

  16. Hanford facility dangerous waste permit application, general information portion. Revision 3

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

  17. Development of a Clean Air Act Title V permit application for Argonne National Laboratory

    SciTech Connect (OSTI)

    Barrett, G.L.

    1994-06-01

    The Clean Air Act Amendments (CAAA) of 1990 instituted major changes in the way that air emission sources are regulated and permitted. Along with being a major research and development laboratory owned by the US Department of Energy, Argonne National Laboratory (ANL) is also classified as a major source of oxides of nitrogen (NO{sub x}) in the Chicago metropolitan area which has been designated by the US Environmental Protection Agency (USEPA) as severe (17) for ozone. As a major source ANL is therefore required under Title V of CAAA to apply for a federally enforceable permit for all sources of air emissions at the facility. While the ANL Boiler House represents the most significant emission source at the Laboratory, there are, nevertheless, a large number of other emission sources, some of which are currently permitted by the State of Illinois and others of which are exempt from state permitting requirements. A large number of R & D related sources are of relatively small magnitude. The ability to identify, inventory, characterize and classify all sources under the various titles of CAAA constitutes a major challenge for R & D laboratories of this size.

  18. Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

  19. Environmental surveillance master sampling schedule

    SciTech Connect (OSTI)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  20. NID Copper Sample Analysis

    SciTech Connect (OSTI)

    Kouzes, Richard T.; Zhu, Zihua

    2011-02-01

    The current focal point of the nuclear physics program at PNNL is the MAJORANA DEMONSTRATOR, and the follow-on Tonne-Scale experiment, a large array of ultra-low background high-purity germanium detectors, enriched in 76Ge, designed to search for zero-neutrino double-beta decay (0???). This experiment requires the use of germanium isotopically enriched in 76Ge. The DEMONSTRATOR will utilize 76Ge from Russia, but for the Tonne-Scale experiment it is hoped that an alternate technology under development at Nonlinear Ion Dynamics (NID) will be a viable, US-based, lower-cost source of separated material. Samples of separated material from NID require analysis to determine the isotopic distribution and impurities. The MAJORANA DEMONSTRATOR is a DOE and NSF funded project with a major science impact. DOE is funding NID through an SBIR grant for development of their separation technology for application to the Tonne-Scale experiment. The Environmental Molecular Sciences facility (EMSL), a DOE user facility at PNNL, has the required mass spectroscopy instruments for making these isotopic measurements that are essential to the quality assurance for the MAJORANA DEMONSTRATOR and for the development of the future separation technology required for the Tonne-Scale experiment. A sample of isotopically separated copper was provided by NID to PNNL for isotopic analysis as a test of the NID technology. The results of that analysis are reported here.

  1. NID Copper Sample Analysis

    SciTech Connect (OSTI)

    Kouzes, Richard T.; Zhu, Zihua

    2011-09-12

    The current focal point of the nuclear physics program at PNNL is the MAJORANA DEMONSTRATOR, and the follow-on Tonne-Scale experiment, a large array of ultra-low background high-purity germanium detectors, enriched in 76Ge, designed to search for zero-neutrino double-beta decay (0???). This experiment requires the use of germanium isotopically enriched in 76Ge. The MAJORANA DEMONSTRATOR is a DOE and NSF funded project with a major science impact. The DEMONSTRATOR will utilize 76Ge from Russia, but for the Tonne-Scale experiment it is hoped that an alternate technology, possibly one under development at Nonlinear Ion Dynamics (NID), will be a viable, US-based, lower-cost source of separated material. Samples of separated material from NID require analysis to determine the isotopic distribution and impurities. DOE is funding NID through an SBIR grant for development of their separation technology for application to the Tonne-Scale experiment. The Environmental Molecular Sciences facility (EMSL), a DOE user facility at PNNL, has the required mass spectroscopy instruments for making isotopic measurements that are essential to the quality assurance for the MAJORANA DEMONSTRATOR and for the development of the future separation technology required for the Tonne-Scale experiment. A sample of isotopically separated copper was provided by NID to PNNL in January 2011 for isotopic analysis as a test of the NID technology. The results of that analysis are reported here. A second sample of isotopically separated copper was provided by NID to PNNL in August 2011 for isotopic analysis as a test of the NID technology. The results of that analysis are also reported here.

  2. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  3. Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

    SciTech Connect (OSTI)

    Halsey, Jeffery D.

    2013-08-28

    Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices to make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.

  4. IFQ Permit Holder Fee Submission Form Page 1 of 8

    E-Print Network [OSTI]

    Marine Fisheries Service (NMFS) Operations & Management Division (OMD) P.O. Box 21668 Juneau, Alaska or money order, make payable to National Marine Fisheries Service REMINDER! Sign your check. NOTE-vessel value or price. #12;IFQ Permit Holder Fee Submission Form Page 3 of 8 BLOCK F ­ FEE CALCULATION Permit

  5. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1995-09-05

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  6. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect (OSTI)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  7. Apparatus and process for collection of gas and vapor samples

    DOE Patents [OSTI]

    Jackson, Dennis G. (Augusta, GA); Peterson, Kurt D. (Aiken, SC); Riha, Brian D. (Augusta, GA)

    2008-04-01

    A gas sampling apparatus and process is provided in which a standard crimping tool is modified by an attached collar. The collar permits operation of the crimping tool while also facilitating the introduction of a supply of gas to be introduced into a storage vial. The introduced gas supply is used to purge ambient air from a collection chamber and an interior of the sample vial. Upon completion of the purging operation, the vial is sealed using the crimping tool.

  8. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    SciTech Connect (OSTI)

    Johnson, J.E. [Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.; Snider, C.A. [USDOE Carlsbad Area Office, NM (United States)

    1995-12-31

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State`s Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP`s Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m{sup 3} of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals.

  9. A novel biomimetic approach to the design of high-performance ceramic/metal composites

    E-Print Network [OSTI]

    Launey, Maximilien E.

    2010-01-01

    based  on  the  “lubricant  phase” design  concept.   The phase  which  acts  like  a  lubricant  to  permit  limited physical  form,  the  “lubricant  phase”  serves  the  same 

  10. Testing Kentucky Coal to Set Design Criteria for a Lurgi Gasification Plant 

    E-Print Network [OSTI]

    Roeger, A., III; Jones, J. E., Jr.

    1983-01-01

    -product characterization, and wastewater treatability. The results from this testing program formed the basis for recommendations concerning technical and environmental design criteria and permit applications....

  11. Task 16 -- Sampling and analysis at the Vortec vitrification facility in Paducah, Kentucky. Semi-annual report, April 1--September 30, 1997

    SciTech Connect (OSTI)

    Laudal, D.L.; Lilemoen, C.M.; Hurley, J.P.; Ness, S.R.; Stepan, D.J.; Thompson, J.S.

    1997-05-01

    The Vortec Cyclone Melting System (CMS{reg_sign}) facility, to be located at the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant, is designed to treat soil contaminated with low levels of heavy metals and radioactive elements, as well as organic waste. To assure that costs of sampling and analysis are contained, Vortec and the DOE Federal Energy Technology Center (FETC) have decided that initially the primary focus of the sampling activities will be on meeting permitting requirements of the state of Kentucky. Therefore, sampling will be limited to the feedstock entering the system, and the glass, flue gas, and water leaving the system. The authors provide suggestions for optional sampling points and procedures in case there is later interest in operations or mass balance data. The permits do not require speciation of the materials in the effluents, only opacity, total radioactivity, total particulate, and total HCl emissions for the gaseous emissions and total radioactivity in the water and solid products. In case future testing to support operations or mass balances is required, the authors include in this document additional information on the analyses of some species of interest. They include heavy metals (RCRA [Resource Conservation and Recovery Act] and Cu and Ni), radionuclides (Th{sub 230}, U{sub 235}, Tc{sup 99}, Cs{sup 137}, and Pu{sup 239}), and dioxins/furans.

  12. Inertial impaction air sampling device

    DOE Patents [OSTI]

    Dewhurst, K.H.

    1990-05-22

    An inertial impactor is designed which is to be used in an air sampling device for collection of respirable size particles in ambient air. The device may include a graphite furnace as the impaction substrate in a small-size, portable, direct analysis structure that gives immediate results and is totally self-contained allowing for remote and/or personal sampling. The graphite furnace collects suspended particles transported through the housing by means of the air flow system, and these particles may be analyzed for elements, quantitatively and qualitatively, by atomic absorption spectrophotometry. 3 figs.

  13. Microfluidic-Based Robotic Sampling System for Radioactive Solutions

    SciTech Connect (OSTI)

    Jack D. Law; Julia L. Tripp; Tara E. Smith; Veronica J. Rutledge; Troy G. Garn; John Svoboda; Larry Macaluso

    2014-02-01

    A novel microfluidic based robotic sampling system has been developed for sampling and analysis of liquid solutions in nuclear processes. This system couples the use of a microfluidic sample chip with a robotic system designed to allow remote, automated sampling of process solutions in-cell and facilitates direct coupling of the microfluidic sample chip with analytical instrumentation. This system provides the capability for near real time analysis, reduces analytical waste, and minimizes the potential for personnel exposure associated with traditional sampling methods. A prototype sampling system was designed, built and tested. System testing demonstrated operability of the microfluidic based sample system and identified system modifications to optimize performance.

  14. RENEWAL OF WORK PERMITS/STUDENT AUTHORIZATIONS FOR MSP Please note that copies of work permits/student authorizations must be submitted to

    E-Print Network [OSTI]

    Kavanagh, Karen L.

    RENEWAL OF WORK PERMITS/STUDENT AUTHORIZATIONS FOR MSP Please note that copies of work permits in which a Work Permit or Student Authorization expires. If they are renewed, coverage will only) If the renewal date is the day immediately following the expiration of the previous permit

  15. Design Editorial Design Innovation

    E-Print Network [OSTI]

    Papalambros, Panos

    juxtaposition of innovation versus invention: "Invention is the first occurrence of an idea for a new product such as innovation strategies, product design, service inno- vation, cutting-edge designers, design awards, and green design. Much of that perspective on innovation is then tied to industrial or product design, often

  16. On-Site Wastewater Treatment Systems: Selecting and Permitting 

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30

    This publication explains factors to consider when choosing an on-site wastewater treatment system and lists the nine steps required to obtain a permit for one. It includes addresses and phone numbers of Texas Natural Resource Conservation...

  17. Subsistence Halibut Special Permits Application Page 1 of 6

    E-Print Network [OSTI]

    (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe of Tribal Representative 5. Name of CHP Coordinator (First, Middle, Last) 6. Daytime Telephone Number 7. E

  18. Emissions Trading with Profit-Neutral Permit Allocations

    E-Print Network [OSTI]

    Hepburn, Cameron J.; Quah, John K.-H.; Ritz, Robert A.

    2012-08-17

    This paper examines the impact of an emissions trading scheme (ETS) on equilibrium emissions, output, price, market concentration, and profits in a generalized Cournot model. We develop formulae for the number of emissions permits that have...

  19. City of San Diego- Sustainable Building Expedited Permit Program

    Broader source: Energy.gov [DOE]

    In 2002, the City of San Diego passed a Resolution R-298001, which amended the Sustainable Building Policy to allow for expedited permitting for sustainable buildings. Sustainable buildings are...

  20. Application for Presidential Permit OE Docket No. PP-396 Emera...

    Broader source: Energy.gov (indexed) [DOE]

    6 Emera Maine FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April 28,...

  1. Application for Presidential Permit OE Docket No. PP-412 ITC...

    Office of Environmental Management (EM)

    Docket No. PP-412 ITC Lake Erie Connector Project Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014...

  2. RCRA Hazardous Waste Part A Permit Application: Instructions...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit Application: Instructions and Form (EPA Form 8700-23) Abstract...

  3. Hazardous Waste Facility Permit Public Comments to Community...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delete Section 5.3.7 on RACER. Provide a description of Intellus. Yes 2.0 Yes 5.1 Yes Hazardous Waste Facility Permit Public Comments to Community Relations Plan Annual Summary of...

  4. Application for presidential permit OE Docket No. PP-304 Generadora...

    Energy Savers [EERE]

    SA DE CV to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-304 Generadora Del...

  5. RRC - Supplemental Application Information for Permit to Maintain...

    Open Energy Info (EERE)

    RRC - Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to...

  6. Research Permit Procedure in JKT, Indonesia (June 2008)

    E-Print Network [OSTI]

    Riley, Erin P.

    Research Permit Procedure in JKT, Indonesia (June 2008) Arrive in Jakarta. Immigration stamp should Indonesia, all need to do is surrender KITAS at airport DAY 2: GO TO: (1) Polisi: pick up SKJ (ready

  7. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Application for Permit to Install Utility Facilities Within Public ROW Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMDOT...

  8. Taxes, Permits, and the Adoption of Abatement Technology under...

    Open Energy Info (EERE)

    the regulator does not adjust the level of the policies in response to the advent of the new technology, the extent of violations under tradable emissions permits (TEPs)- in...

  9. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    for Presidential Permit PP-400 TDI-NE - New England Clean Power Link Project - Motion to Intervene and Comments of the Vermont Department of Public Service - August 6, 2014...

  10. AZPDES General Permit for Stormwater Discharges Associated with...

    Open Energy Info (EERE)

    Stormwater Discharges Associated with Construction Activity (Permit No. AZG2013-001) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther:...

  11. Expedited Permitting Process for Solar Photovoltaic Systems (Vermont)

    Broader source: Energy.gov [DOE]

    Vermont has established an expedited permitting process for solar photovoltaic systems that are 10 kilowatts-AC (kW) or less. In order to interconnect and net meter, electric customers in Vermont...

  12. Idaho Right-of-Way Encroachment Application and Permit - Other...

    Open Energy Info (EERE)

    Idaho Right-of-Way Encroachment Application and Permit - Other Encroachments Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Right-of-Way...

  13. NMDOT Application for Permit to Construct an Access or Median...

    Open Energy Info (EERE)

    NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of Way Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  14. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control.

  15. Regulatory compliance and air quality permitting: Why do firms overcomply?

    E-Print Network [OSTI]

    DeHart-Davis, Leisha; Bozeman, Barry

    2001-10-01

    Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. Regulatory compliance and air quality permitting: Why do firms overcomply? Leisha DeHart-Davis; Barry Bozeman Journal of Public Administration...Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. Regulatory compliance and air quality permitting: Why do firms overcomply? Leisha DeHart-Davis; Barry Bozeman Journal of Public Administration...

  16. Rain sampling device

    DOE Patents [OSTI]

    Nelson, D.A.; Tomich, S.D.; Glover, D.W.; Allen, E.V.; Hales, J.M.; Dana, M.T.

    1991-05-14

    The present invention constitutes a rain sampling device adapted for independent operation at locations remote from the user which allows rainfall to be sampled in accordance with any schedule desired by the user. The rain sampling device includes a mechanism for directing wet precipitation into a chamber, a chamber for temporarily holding the precipitation during the process of collection, a valve mechanism for controllably releasing samples of the precipitation from the chamber, a means for distributing the samples released from the holding chamber into vessels adapted for permanently retaining these samples, and an electrical mechanism for regulating the operation of the device. 11 figures.

  17. Rain sampling device

    DOE Patents [OSTI]

    Nelson, Danny A. (Richland, WA); Tomich, Stanley D. (Richland, WA); Glover, Donald W. (Prosser, WA); Allen, Errol V. (Benton City, WA); Hales, Jeremy M. (Kennewick, WA); Dana, Marshall T. (Richland, WA)

    1991-01-01

    The present invention constitutes a rain sampling device adapted for independent operation at locations remote from the user which allows rainfall to be sampled in accordance with any schedule desired by the user. The rain sampling device includes a mechanism for directing wet precipitation into a chamber, a chamber for temporarily holding the precipitation during the process of collection, a valve mechanism for controllably releasing samples of said precipitation from said chamber, a means for distributing the samples released from the holding chamber into vessels adapted for permanently retaining these samples, and an electrical mechanism for regulating the operation of the device.

  18. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T. [ERM-Southwest, Inc., Houston, TX (United States)

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  19. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    SciTech Connect (OSTI)

    Olander, A.R.

    1995-03-10

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE`s treatment technology to the limit of its capability.`` Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations.

  20. Copyright 1998 Faculty of Electrical Engineering and Computing (FER). Published in the Proceedings of WDTA'98, Dubrovnik, Croatia, June 8-10, 1998. Personal use of this material is permitted. However, permission to reprint/republish this material for adve

    E-Print Network [OSTI]

    Cardoso, João Manuel Paiva

    of WDTA'98, Dubrovnik, Croatia, June 8- 10, 1998. Personal use of this material is permitted. However on Design, Test and Applications, Dubrovnik, Croatia, June 8-10, 1998, pp. 149-152. An Approach to Hardware

  1. Design Editorial Design Intent

    E-Print Network [OSTI]

    Papalambros, Panos

    Journal of Mechanical Design Editorial Design Intent Is this paper suitable for JMD of criteria to answer the question. As editor of JMD, apart from the obvious criteria of quality and research assumed my editorial duties is the paper's design intent. It was in that spirit that I wrote the Design

  2. Abatement of Air Pollution: Permit to Construct and Operate Stationary Sources (Connecticut)

    Broader source: Energy.gov [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements, authorized activities...

  3. Application for Presidential Permit OE Doc. No. PP-399 MATL LLP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    79, No. 93 - May 14, 2014 Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission...

  4. Application for Presidential Permit OE Docket No. PP-399 MATL LLP

    Broader source: Energy.gov [DOE]

    Application to rescind Presidential Permit held by Montana Alberta Tie Ltd. and issue a permit to MATL covering the same international transmission facilities.

  5. Vermont General Permit 3-9020 for Stormwater Runoff from Construction...

    Open Energy Info (EERE)

    Vermont General Permit 3-9020 for Stormwater Runoff from Construction Sites Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit...

  6. Application for Presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

  7. Regulatory Side-by-Side Governing Permitting of Cross-Border...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Side-by-Side Governing Permitting of Cross-Border Electricity Transmission Facilities Between the United States and Canada Regulatory Side-by-Side Governing Permitting...

  8. ALARA ASSESSMENT OF SETTLER SLUDGE SAMPLING METHODS

    SciTech Connect (OSTI)

    NELSEN LA

    2009-01-30

    The purpose of this assessment is to compare underwater and above water settler sludge sampling methods to determine if the added cost for underwater sampling for the sole purpose of worker dose reductions is justified. Initial planning for sludge sampling included container, settler and knock-out-pot (KOP) sampling. Due to the significantly higher dose consequence of KOP sludge, a decision was made to sample KOP underwater to achieve worker dose reductions. Additionally, initial plans were to utilize the underwater sampling apparatus for settler sludge. Since there are no longer plans to sample KOP sludge, the decision for underwater sampling for settler sludge needs to be revisited. The present sampling plan calls for spending an estimated $2,500,000 to design and construct a new underwater sampling system (per A21 C-PL-001 RevOE). This evaluation will compare and contrast the present method of above water sampling to the underwater method that is planned by the Sludge Treatment Project (STP) and determine if settler samples can be taken using the existing sampling cart (with potentially minor modifications) while maintaining doses to workers As Low As Reasonably Achievable (ALARA) and eliminate the need for costly redesigns, testing and personnel retraining.

  9. Design for manufacturability Design verification

    E-Print Network [OSTI]

    Patel, Chintan

    ITRS Design #12;Design · Design for manufacturability · Design verification #12;Design for Manufacturability · Architecture challenges · Logic and circuit challenges · Layout and physical design challenges · Expected to be the source of multiple DFM challenges · Invest in variability reduction or design

  10. Hanford facility dangerous waste permit application, general information portion

    SciTech Connect (OSTI)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  11. Air Pollution Control Regulations: No. 9- Air Pollution Control Permits (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations describe permitting procedures and requirements for minor and major sources of emissions.

  12. How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year

    E-Print Network [OSTI]

    Goda, Keisuke

    How to Register for a Bicycle and Motorcycle Parking Permit Student 1,000 yen/year 15,000 yen the permit on the fender of your bike where it can be seen easily. Application Procedures Bicycle Permit Motorcycle Permit Bicycle Permit Motorcycle Permit Dai-ni Koubaibu Store: Weekdays 10 00 19 00 Nougakubu

  13. File:06CAATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, searchInformation6CAATransportationPermit.pdf

  14. File:06IDATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History View06IDATransportationPermit.pdf

  15. File:06IDCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History6IDCDrinkingWaterPermit.pdf Jump to:

  16. File:06NVATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source6MTEFloodplainDevelopmentPermit

  17. File:06NVCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to: navigation, search File

  18. File:06ORATransportationPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to: navigation, search

  19. File:06ORCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf Jump to:

  20. File:06UTBStormWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf6UTATransportation.pdf Jump

  1. File:06UTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to:6NVCDrinkingWaterPermit.pdf6UTATransportation.pdf

  2. File:Permit packet s-8.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermitPermit packet

  3. File:Permit2012.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermitPermit

  4. Presidential Permit Holders - Annual Reports | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidential permit

  5. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 - Applications JumpPermits |RegulationsWater Permit

  6. Sampling system and method

    DOE Patents [OSTI]

    Decker, David L.; Lyles, Brad F.; Purcell, Richard G.; Hershey, Ronald Lee

    2013-04-16

    The present disclosure provides an apparatus and method for coupling conduit segments together. A first pump obtains a sample and transmits it through a first conduit to a reservoir accessible by a second pump. The second pump further conducts the sample from the reservoir through a second conduit.

  7. IDENTIFICATION Your Sample Box

    E-Print Network [OSTI]

    Liskiewicz, Maciej

    to Virginia Tech Soil Testing Lab, 145 Smyth Hall (MC 0465), 185 Ag Quad Ln, Blacksburg VA 24061, in sturdy, K, Ca, Mg, Zn, Mn, Cu, Fe, B, and soluble salts) NoCharge $16.00 Organic Matter $4.00 $6.00 Fax with soil sample and form; make check or money order payable to "Treasurer, Virginia Tech." COST PER SAMPLE

  8. Free Standing Soil Sample

    E-Print Network [OSTI]

    Stuart, Steven J.

    Free Standing Soil Sample Kiosks Clemson University Cooperative Extension Service Reportto of Richland County, Jackie Kopack Jordan has partnered with local garden centers to provide free standing soil sample collections sites. The free standing kiosks are located at three local garden centers. Woodley

  9. DESIGN OF A MICROCHANNEL BASED SOLAR RECEIVER/REACTOR FOR

    E-Print Network [OSTI]

    Apte, Sourabh V.

    DESIGN OF A MICROCHANNEL BASED SOLAR RECEIVER/REACTOR FOR METHANE-STEAM REFORMING Drost, K. J designs that permit increase in the overall solar to chemical conversion efficiency are needed of fuels is needed. Solar re- ceivers based on a volumetric or cavity receiver design are common [8, 9, 10

  10. 2007 Nationwide Permits, Conditions, Further Information, and Definitions (with corrections)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Discharges 19. Minor Dredging 20. Oil Spill Cleanup 21. Surface Coal Mining Operations 22. Removal of Vessels Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities Nationwide Permit. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. Pipeline

  11. FEDERAL PERMIT APPLICATION FOR VESSELS FISHING FOR WRECKFISH

    E-Print Network [OSTI]

    1 FEDERAL PERMIT APPLICATION FOR VESSELS FISHING FOR WRECKFISH OFF THE SOUTH ATLANTIC STATES OMB can you bring to the dock when full? USCG DOCUMENTED VESSELS ONLY Gross Tons Net Tons Hull Material) United States Coast Guard (USCG) Certificate of Documentation or a copy of the State Vessel Registration

  12. The Initial Allocation of Carbon Permits: Choices and Implications

    E-Print Network [OSTI]

    -enforced cartel to restrict quantity, in order to raise price. Quantity of coal-fired electricity Price Marginal" for electricity is a "demand for pollution." Restricted number of permits #12;Four Important Goals for Use. ­ If not use auction revenue to reduce marginal tax rates, then higher energy/goods prices mean lower real net

  13. State waste discharge permit application, 200-E chemical drain field

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  14. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  15. Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

    SciTech Connect (OSTI)

    Young, K. R.; Levine, A.

    2014-09-01

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

  16. Wave Energy Development in Oregon Licensing & Permitting Requirements

    E-Print Network [OSTI]

    July 09 Wave Energy Development in Oregon Licensing & Permitting Requirements Prepared by Pacific Energy Ventures on behalf of the Oregon Wave Energy Trust w w w . o r e g o n w a v e . o r g #12;This study was commissioned by Oregon Wave Energy Trust. Oregon Wave Energy Trust is funded by the Oregon

  17. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern.

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  18. RESULTS FOR THE THIRD QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Reigel, M.

    2011-10-20

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Third Quarter samples collected from Tank 50 on July 7, 2011 and discusses those results in further detail than the previously issued results report.

  19. RESULTS FOR THE FOURTH QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Bannochie, C.

    2012-01-31

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

  20. Water Sample Concentrator

    ScienceCinema (OSTI)

    Idaho National Laboratory

    2010-01-08

    Automated portable device that concentrates and packages a sample of suspected contaminated water for safe, efficient transport to a qualified analytical laboratory. This technology will help safeguard against pathogen contamination or chemical and biolog

  1. Liquid scintillator sampling calorimetry 

    E-Print Network [OSTI]

    Dudgeon, R. Greg

    1994-01-01

    This research was supported by the Department of Energy to investigate a new sampling calorimeter technology for the high intensity regions of the Superconducting Supercollider. The technology involved using liquid scintillator filled glass tubes...

  2. Sample Changes and Issues

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    EIA-914 Survey and HPDI. Figure 2 shows how this could change apparent production. The blue line shows the reported sample production as it would normally be reported under the...

  3. Dissolution actuated sample container

    DOE Patents [OSTI]

    Nance, Thomas A.; McCoy, Frank T.

    2013-03-26

    A sample collection vial and process of using a vial is provided. The sample collection vial has an opening secured by a dissolvable plug. When dissolved, liquids may enter into the interior of the collection vial passing along one or more edges of a dissolvable blocking member. As the blocking member is dissolved, a spring actuated closure is directed towards the opening of the vial which, when engaged, secures the vial contents against loss or contamination.

  4. SAMPLING AND ANALYSIS PROTOCOLS

    SciTech Connect (OSTI)

    Jannik, T; P Fledderman, P

    2007-02-09

    Radiological sampling and analyses are performed to collect data for a variety of specific reasons covering a wide range of projects. These activities include: Effluent monitoring; Environmental surveillance; Emergency response; Routine ambient monitoring; Background assessments; Nuclear license termination; Remediation; Deactivation and decommissioning (D&D); and Waste management. In this chapter, effluent monitoring and environmental surveillance programs at nuclear operating facilities and radiological sampling and analysis plans for remediation and D&D activities will be discussed.

  5. Liquid sampling system

    DOE Patents [OSTI]

    Larson, L.L.

    1984-09-17

    A conduit extends from a reservoir through a sampling station and back to the reservoir in a closed loop. A jet ejector in the conduit establishes suction for withdrawing liquid from the reservoir. The conduit has a self-healing septum therein upstream of the jet ejector for receiving one end of a double-ended cannula, the other end of which is received in a serum bottle for sample collection. Gas is introduced into the conduit at a gas bleed between the sample collection bottle and the reservoir. The jet ejector evacuates gas from the conduit and the bottle and aspirates a column of liquid from the reservoir at a high rate. When the withdrawn liquid reaches the jet ejector the rate of flow therethrough reduces substantially and the gas bleed increases the pressure in the conduit for driving liquid into the sample bottle, the gas bleed forming a column of gas behind the withdrawn liquid column and interrupting the withdrawal of liquid from the reservoir. In the case of hazardous and toxic liquids, the sample bottle and the jet ejector may be isolated from the reservoir and may be further isolated from a control station containing remote manipulation means for the sample bottle and control valves for the jet ejector and gas bleed. 5 figs.

  6. Liquid sampling system

    DOE Patents [OSTI]

    Larson, Loren L. (Idaho Falls, ID)

    1987-01-01

    A conduit extends from a reservoir through a sampling station and back to the reservoir in a closed loop. A jet ejector in the conduit establishes suction for withdrawing liquid from the reservoir. The conduit has a self-healing septum therein upstream of the jet ejector for receiving one end of a double-ended cannula, the other end of which is received in a serum bottle for sample collection. Gas is introduced into the conduit at a gas bleed between the sample collection bottle and the reservoir. The jet ejector evacuates gas from the conduit and the bottle and aspirates a column of liquid from the reservoir at a high rate. When the withdrawn liquid reaches the jet ejector the rate of flow therethrough reduces substantially and the gas bleed increases the pressure in the conduit for driving liquid into the sample bottle, the gas bleed forming a column of gas behind the withdrawn liquid column and interrupting the withdrawal of liquid from the reservoir. In the case of hazardous and toxic liquids, the sample bottle and the jet ejector may be isolated from the reservoir and may be further isolated from a control station containing remote manipulation means for the sample bottle and control valves for the jet ejector and gas bleed.

  7. Automated LEPS (low-energy photon spectrometry) system using a robotic sample changer

    SciTech Connect (OSTI)

    Delmastro, J.R.; Wade, M.A.; Dykes, F.W. (Westinghouse Idaho Nuclear Company, Idaho Falls (USA)); Lewis, A.L. (ARAMCO, Dhahran (Saudi Arabia))

    1989-11-01

    At the Idaho Chemical Processing Plant, effluent waste streams are regularly monitored for {sup 129}I. After sample preparation, a filter paper containing the separated radioiodine is mounted on an aluminum backing card for ease in handling. The card is loaded onto a low-energy photon detector and counted for {approximately}2 h with a Nuclear Data ND6700 spectrometer. After the counting is complete, the ND6700 system analyzes the spectrum to determine the quantity of {sup 129}I in the sample. The {sup 129}I in a typical waste stream sample is determined by counting four separate samples, i.e., duplicates of the waste stream sample, a blank, and an unknown quality control sample. The need arose to process large numbers of these samples. To improve sample throughput and permit unattended counting of these samples, a totally automated low-energy photon spectrometry (LEPS) system was developed to perform all the sample handling and analysis operations.

  8. Vapor port and groundwater sampling well

    DOE Patents [OSTI]

    Hubbell, J.M.; Wylie, A.H.

    1996-01-09

    A method and apparatus have been developed for combining groundwater monitoring wells with unsaturated-zone vapor sampling ports. The apparatus allows concurrent monitoring of both the unsaturated and the saturated zone from the same well at contaminated areas. The innovative well design allows for concurrent sampling of groundwater and volatile organic compounds (VOCs) in the vadose (unsaturated) zone from a single well, saving considerable time and money. The sample tubes are banded to the outer well casing during installation of the well casing. 10 figs.

  9. Vapor port and groundwater sampling well

    DOE Patents [OSTI]

    Hubbell, Joel M. (Idaho Falls, ID); Wylie, Allan H. (Idaho Falls, ID)

    1996-01-01

    A method and apparatus has been developed for combining groundwater monitoring wells with unsaturated-zone vapor sampling ports. The apparatus allows concurrent monitoring of both the unsaturated and the saturated zone from the same well at contaminated areas. The innovative well design allows for concurrent sampling of groundwater and volatile organic compounds (VOCs) in the vadose (unsaturated) zone from a single well, saving considerable time and money. The sample tubes are banded to the outer well casing during installation of the well casing.

  10. High performance APCS conceptual design and evaluation scoping study

    SciTech Connect (OSTI)

    Soelberg, N.; Liekhus, K.; Chambers, A.; Anderson, G.

    1998-02-01

    This Air Pollution Control System (APCS) Conceptual Design and Evaluation study was conducted to evaluate a high-performance (APC) system for minimizing air emissions from mixed waste thermal treatment systems. Seven variations of high-performance APCS designs were conceptualized using several design objectives. One of the system designs was selected for detailed process simulation using ASPEN PLUS to determine material and energy balances and evaluate performance. Installed system capital costs were also estimated. Sensitivity studies were conducted to evaluate the incremental cost and benefit of added carbon adsorber beds for mercury control, specific catalytic reduction for NO{sub x} control, and offgas retention tanks for holding the offgas until sample analysis is conducted to verify that the offgas meets emission limits. Results show that the high-performance dry-wet APCS can easily meet all expected emission limits except for possibly mercury. The capability to achieve high levels of mercury control (potentially necessary for thermally treating some DOE mixed streams) could not be validated using current performance data for mercury control technologies. The engineering approach and ASPEN PLUS modeling tool developed and used in this study identified APC equipment and system performance, size, cost, and other issues that are not yet resolved. These issues need to be addressed in feasibility studies and conceptual designs for new facilities or for determining how to modify existing facilities to meet expected emission limits. The ASPEN PLUS process simulation with current and refined input assumptions and calculations can be used to provide system performance information for decision-making, identifying best options, estimating costs, reducing the potential for emission violations, providing information needed for waste flow analysis, incorporating new APCS technologies in existing designs, or performing facility design and permitting activities.

  11. Viscous sludge sample collector

    DOE Patents [OSTI]

    Beitel, George A [Richland, WA

    1983-01-01

    A vertical core sample collection system for viscous sludge. A sample tube's upper end has a flange and is attached to a piston. The tube and piston are located in the upper end of a bore in a housing. The bore's lower end leads outside the housing and has an inwardly extending rim. Compressed gas, from a storage cylinder, is quickly introduced into the bore's upper end to rapidly accelerate the piston and tube down the bore. The lower end of the tube has a high sludge entering velocity to obtain a full-length sludge sample without disturbing strata detail. The tube's downward motion is stopped when its upper end flange impacts against the bore's lower end inwardly extending rim.

  12. Recent Results of the Investigation of a Microfluidic Sampling Chip and Sampling System for Hot Cell Aqueous Processing Streams

    SciTech Connect (OSTI)

    Julia Tripp; Jack Law; Tara Smith

    2013-10-01

    A Fuel Cycle Research and Development project has investigated an innovative sampling method that could evolve into the next generation sampling and analysis system for metallic elements present in aqueous processing streams. Initially sampling technologies were evaluated and microfluidics sampling chip technology was selected and tested. A conceptual design for a fully automated microcapillary-based system was completed and a robotic automated sampling system was fabricated. The mechanical and sampling operation of the completed sampling system was investigated. In addition, the production of a less expensive, mass produced sampling chip was investigated to avoid chip reuse thus increasing sampling reproducibility/accuracy. The microfluidic-based robotic sampling system’s mechanical elements were tested to ensure analytical reproducibility and the optimum robotic handling of microfluidic sampling chips.

  13. Title V permitting delayed for some non-major sources

    SciTech Connect (OSTI)

    Bassett, S.M.

    1996-03-01

    Some small businesses subject to the Clean Air Act`s maximum achievable control technology (MACT) regulations may be a break from the US Environmental Protection Agency (EPA). While the businesses, considered non-major air-pollutant sources, must still meet all MACT requirements, they are likely to receive a Title V operating permit program deferral. On December 13, 1995, EPA proposed to defer Title V operating permit requirements for non-major sources in the following three industries: decorative chromium electroplating and chromium anodizing; perchloroethylene dry cleaning; ethylene oxide commercial sterilization and fumigation. In addition to describing its reasons for the temporary deferments, EPA sets forth the rationale for permanently exempting certain non-major electroplating and anodizing sources. This rationale may pave the way for small businesses in other industries to escape Title V.

  14. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia: EnergyMaryland: Energy ResourcesVermont:Westway,NewWetland Permit

  15. WAC - 173-401 Operating Permit Regulation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,Village of Wellington,FL LLCImplementation1 Operating Permit

  16. Appendix F. Permits AnnualSiteEnvironmentalRepor

    E-Print Network [OSTI]

    Pennycook, Steve

    /01/2005 03/31/2010 DOE DOE BWXT CWA Pump & Haul 9720-82 SOP 04018 11/30/2004 11/30/2009 BWXT BWXT BWXT CWA Landfill VI (Postclosure care and maintenance) DML-01-103-0036 Permit terminated by TDEC 3/15/2007 NA DOE and maintenance) IDL-01-103-0189 Most recent modification approved 5/8/1992 DOE DOE/BJC BJC #12;Annual Site

  17. Hawaii Guide for Filing Community Noise Permit Applications | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynnMassachusetts:Ohio:Website Jump to: navigation,Information Permit

  18. File:05DrillingPermittingOverview.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search File File

  19. File:06AKCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search

  20. File:06IDBConstructionStormwaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History

  1. File:06MTCDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source

  2. File:Permit factsheet.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdfgaspOregonSHPOClearanceForm.pdf JumpPermit

  3. New Mexico Guidelines for Public Notification for Air Quality Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures LtdNeville, Ohio:Archaeological Permits Webpage

  4. State Waste Discharge Permit Application: Electric resistance tomography testing

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  5. Visual Sample Plan (VSP) - FIELDS Integration

    SciTech Connect (OSTI)

    Pulsipher, Brent A.; Wilson, John E.; Gilbert, Richard O.; Hassig, Nancy L.; Carlson, Deborah K.; Bing-Canar, John; Cooper, Brian; Roth, Chuck

    2003-04-19

    Two software packages, VSP 2.1 and FIELDS 3.5, are being used by environmental scientists to plan the number and type of samples required to meet project objectives, display those samples on maps, query a database of past sample results, produce spatial models of the data, and analyze the data in order to arrive at defensible decisions. VSP 2.0 is an interactive tool to calculate optimal sample size and optimal sample location based on user goals, risk tolerance, and variability in the environment and in lab methods. FIELDS 3.0 is a set of tools to explore the sample results in a variety of ways to make defensible decisions with quantified levels of risk and uncertainty. However, FIELDS 3.0 has a small sample design module. VSP 2.0, on the other hand, has over 20 sampling goals, allowing the user to input site-specific assumptions such as non-normality of sample results, separate variability between field and laboratory measurements, make two-sample comparisons, perform confidence interval estimation, use sequential search sampling methods, and much more. Over 1,000 copies of VSP are in use today. FIELDS is used in nine of the ten U.S. EPA regions, by state regulatory agencies, and most recently by several international countries. Both software packages have been peer-reviewed, enjoy broad usage, and have been accepted by regulatory agencies as well as site project managers as key tools to help collect data and make environmental cleanup decisions. Recently, the two software packages were integrated, allowing the user to take advantage of the many design options of VSP, and the analysis and modeling options of FIELDS. The transition between the two is simple for the user – VSP can be called from within FIELDS, automatically passing a map to VSP and automatically retrieving sample locations and design information when the user returns to FIELDS. This paper will describe the integration, give a demonstration of the integrated package, and give users download instructions and software requirements for running the integrated package.

  6. File:06COAExtraLegalVehiclePermittingProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    traLegalVehiclePermittingProcess.pdf Jump to: navigation, search File File history File usage Metadata File:06COAExtraLegalVehiclePermittingProcess.pdf Size of this preview: 463 ...

  7. Parking Permit Application, Form HQ F 1400.12 rev 02-10 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Parking Permit Form, Headquarters, Forrestal Parking Permit Application, Form HQ F 1400.12 rev 02-10 More Documents & Publications DOE HQ F 1400.12 Customer Services Handbook,...

  8. Hawaii Clean Energy Initiative Permit to Cross or Enter the State...

    Open Energy Info (EERE)

    Hawaii Clean Energy Initiative Permit to Cross or Enter the State Energy Corridor Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance...

  9. City of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process, and

    E-Print Network [OSTI]

    City of Anaheim This page outlines solar PV incentives, financing mechanisms, permitting process Apply for local permits Install your PV system Arrange for your PV system to be interconnected to your

  10. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    68: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  11. U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory...

  12. Application for Inshore Catcher Vessel Cooperative Permit Page 1 of 6

    E-Print Network [OSTI]

    for the Aleutian Islands (AI) to engage in trawling for pollock in the AI; and · Permit sanctions. The vessel has no permit sanctions that otherwise make it ineligible to engage in fishing for pollock in the BSAI. (3

  13. V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks V-168: Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks May 31, 2013 - 6:00am Addthis...

  14. V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks V-229: IBM Lotus iNotes Input Validation Flaws Permit Cross-Site Scripting Attacks August 28, 2013 -...

  15. You Don't Need to Raise the Roof: Cutting Solar Permitting Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    You Don't Need to Raise the Roof: Cutting Solar Permitting Costs for Wooden Rooftops You Don't Need to Raise the Roof: Cutting Solar Permitting Costs for Wooden Rooftops June 17,...

  16. 19 V.S.A. § 1111 Highway Right-of-Way Permit Application (Form...

    Open Energy Info (EERE)

    9 V.S.A. 1111 Highway Right-of-Way Permit Application (Form TA 210) Example Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  17. Considerations for designing a tradable permit system to control SO? emissions in China

    E-Print Network [OSTI]

    Ellerman, A. Denny

    2001-01-01

    As China's economy has grown, atmospheric pollution has become a greater problem and a matter of increasing concern to policymakers at all levels of government. One of the principal pollutants has been sulfur dioxide (SO2), ...

  18. C.R.S. 37-90-137 - Permits to Construct Wells Outside Designated Basins |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas: Energy Resources Jump to:Energy Inc - WaterInformation

  19. Preconstruction schedules, costs, and permit requirements for electric power generating resources in the Pacific Northwest

    SciTech Connect (OSTI)

    Hendrickson, P.L.; Smith, S.A.; Thurman, A.G.; Watts, R.L.; Weakley, S.A.

    1990-07-01

    This report was prepared for the Generation Programs Branch, Office of Energy Resources, Bonneville Power Administration (BPA). The principal objective of the report is to assemble in one document preconstruction cost, schedule, and permit information for twelve specific generating resources. The report is one of many documents that provide background information for BPA's Resource Program, which is designed to identify the type and amount of new resources that BPA may have to add over the next twenty years to maintain an adequate and reliable electric power supply in the Pacific Northwest. A predecessor to this report is a 1982 report prepared by the Pacific Northwest Laboratory (PNL) for the Northwest Power Planning Council (the Council''). The 1982 report had a similar, but not identical, content and format. 306 refs., 14 figs., 22 tabs.

  20. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  1. Fall 2015 -2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS

    E-Print Network [OSTI]

    Fall 2015 - 2016 PARKING PERMIT RATES (as of 7/22/15) LOWER PRICE OPTIONS West Campus Lot ­ Annual $550.00 Lot R ­ Annual (Liberty Sq/Potomac Hts residents only) $575.00 RESERVED PARKING DECK PERMITS for the following parking options) Adjunct Faculty Permit ­ Semester (only valid in Lot K, PV Lot, and the Field

  2. The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector

    E-Print Network [OSTI]

    McCarl, Bruce A.

    The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector Prepared by: Bruce Mc Washington, D.C. April 1999 #12;ICF 1 The Impacts of Carbon Permit Prices on the U.S. Agricultural Sector be accomplished through a carbon cap and trade system, under which carbon permit prices would emerge

  3. Sampling Report for May-June, 2014 WIPP Samples

    Office of Environmental Management (EM)

    1 L L N L - X X X X - X X X X X Sampling Report for May- June, 2014 WIPP Samples UNCLASSIFIED Forensic Science Center January 8, 2015 Sampling Report for May-June, 2014 WIPP...

  4. Sample introducing apparatus and sample modules for mass spectrometer

    DOE Patents [OSTI]

    Thompson, Cyril V. (Knoxville, TN); Wise, Marcus B. (Kingston, TN)

    1993-01-01

    An apparatus for introducing gaseous samples from a wide range of environmental matrices into a mass spectrometer for analysis of the samples is described. Several sample preparing modules including a real-time air monitoring module, a soil/liquid purge module, and a thermal desorption module are individually and rapidly attachable to the sample introducing apparatus for supplying gaseous samples to the mass spectrometer. The sample-introducing apparatus uses a capillary column for conveying the gaseous samples into the mass spectrometer and is provided with an open/split interface in communication with the capillary and a sample archiving port through which at least about 90 percent of the gaseous sample in a mixture with an inert gas that was introduced into the sample introducing apparatus is separated from a minor portion of the mixture entering the capillary discharged from the sample introducing apparatus.

  5. Sample introducing apparatus and sample modules for mass spectrometer

    DOE Patents [OSTI]

    Thompson, C.V.; Wise, M.B.

    1993-12-21

    An apparatus for introducing gaseous samples from a wide range of environmental matrices into a mass spectrometer for analysis of the samples is described. Several sample preparing modules including a real-time air monitoring module, a soil/liquid purge module, and a thermal desorption module are individually and rapidly attachable to the sample introducing apparatus for supplying gaseous samples to the mass spectrometer. The sample-introducing apparatus uses a capillary column for conveying the gaseous samples into the mass spectrometer and is provided with an open/split interface in communication with the capillary and a sample archiving port through which at least about 90 percent of the gaseous sample in a mixture with an inert gas that was introduced into the sample introducing apparatus is separated from a minor portion of the mixture entering the capillary discharged from the sample introducing apparatus. 5 figures.

  6. Decoupled Sampling for Graphics Pipelines

    E-Print Network [OSTI]

    Ragan-Kelley, Jonathan Millar

    We propose a generalized approach to decoupling shading from visibility sampling in graphics pipelines, which we call decoupled sampling. Decoupled sampling enables stochastic supersampling of motion and defocus blur at ...

  7. Users Handbook for the Argonne Premium Coal Sample Program

    SciTech Connect (OSTI)

    Vorres, K.S.

    1993-10-01

    This Users Handbook for the Argonne Premium Coal Samples provides the recipients of those samples with information that will enhance the value of the samples, to permit greater opportunities to compare their work with that of others, and aid in correlations that can improve the value to all users. It is hoped that this document will foster a spirit of cooperation and collaboration such that the field of basic coal chemistry may be a more efficient and rewarding endeavor for all who participate. The different sections are intended to stand alone. For this reason some of the information may be found in several places. The handbook is also intended to be a dynamic document, constantly subject to change through additions and improvements. Please feel free to write to the editor with your comments and suggestions.

  8. Sampling probe for microarray read out using electrospray mass spectrometry

    DOE Patents [OSTI]

    Van Berkel, Gary J.

    2004-10-12

    An automated electrospray based sampling system and method for analysis obtains samples from surface array spots having analytes. The system includes at least one probe, the probe including an inlet for flowing at least one eluting solvent to respective ones of a plurality of spots and an outlet for directing the analyte away from the spots. An automatic positioning system is provided for translating the probe relative to the spots to permit sampling of any spot. An electrospray ion source having an input fluidicly connected to the probe receives the analyte and generates ions from the analyte. The ion source provides the generated ions to a structure for analysis to identify the analyte, preferably being a mass spectrometer. The probe can be a surface contact probe, where the probe forms an enclosing seal along the periphery of the array spot surface.

  9. Soil sampling kit and a method of sampling therewith

    DOE Patents [OSTI]

    Thompson, Cyril V. (Knoxville, TN)

    1991-01-01

    A soil sampling device and a sample containment device for containing a soil sample is disclosed. In addition, a method for taking a soil sample using the soil sampling device and soil sample containment device to minimize the loss of any volatile organic compounds contained in the soil sample prior to analysis is disclosed. The soil sampling device comprises two close fitting, longitudinal tubular members of suitable length, the inner tube having the outward end closed. With the inner closed tube withdrawn a selected distance, the outer tube can be inserted into the ground or other similar soft material to withdraw a sample of material for examination. The inner closed end tube controls the volume of the sample taken and also serves to eject the sample. The soil sample containment device has a sealing member which is adapted to attach to an analytical apparatus which analyzes the volatile organic compounds contained in the sample. The soil sampling device in combination with the soil sample containment device allow an operator to obtain a soil sample containing volatile organic compounds and minimizing the loss of the volatile organic compounds prior to analysis of the soil sample for the volatile organic compounds.

  10. Soil sampling kit and a method of sampling therewith

    DOE Patents [OSTI]

    Thompson, C.V.

    1991-02-05

    A soil sampling device and a sample containment device for containing a soil sample is disclosed. In addition, a method for taking a soil sample using the soil sampling device and soil sample containment device to minimize the loss of any volatile organic compounds contained in the soil sample prior to analysis is disclosed. The soil sampling device comprises two close fitting, longitudinal tubular members of suitable length, the inner tube having the outward end closed. With the inner closed tube withdrawn a selected distance, the outer tube can be inserted into the ground or other similar soft material to withdraw a sample of material for examination. The inner closed end tube controls the volume of the sample taken and also serves to eject the sample. The soil sample containment device has a sealing member which is adapted to attach to an analytical apparatus which analyzes the volatile organic compounds contained in the sample. The soil sampling device in combination with the soil sample containment device allows an operator to obtain a soil sample containing volatile organic compounds and minimizing the loss of the volatile organic compounds prior to analysis of the soil sample for the volatile organic compounds. 11 figures.

  11. Utah DEQ Air Permitting Branch Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York:PowerNewPumaty Jump to:UAC R930-6 -permitCounty,

  12. Vermont Wetland General Permit (3-9025) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, NewArkansas:Standards Jump to: navigation, searchGeneral Permit

  13. Technological modifications in the nitrogen oxides tradable permit program

    SciTech Connect (OSTI)

    Linn, J.

    2008-07-01

    Tradable permit programs allow firms greater flexibility in reducing emissions than command-and-control regulations and encourage firms to use low cost abatement options, including small-scale modifications to capital equipment. This paper shows that firms have extensively modified capital equipment in the Nitrogen Oxides Budget Trading Program, which covers power plants in the eastern United States. The empirical strategy uses geographic and temporal features of the program to estimate counterfactual emissions, finding that modifications have reduced emission rates by approximately 10-15 percent. The modifications would not have occurred under command-and-control regulation and have reduced regulatory costs.

  14. Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities guidebook

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy Resources JumpNewTexas:HydrothermallyIFB Agro| OpenWater PermitOpen0| Open

  15. Idaho Permit to Construct Application Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy Resources JumpNewTexas:HydrothermallyIFB Agro|How toProof ofOn-SitePermit to

  16. File:03IDCEncroachmentPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETECHIAReservedLandMineralLeasingProcess.pdfIDCEncroachmentPermit.pdf Jump to:

  17. File:06 - ConstructionPermitsOverview.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation, search File5NVBSundryNotice6 -

  18. File:06FDAEPAConstructionGeneralPermitConstructionStormwater.pdf | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History View New Pages Recent Changes

  19. File:06HICDrinkingWaterPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1ORDExplorationInjectionPermit (1).pdf Jump to: navigation,source History View New Pages

  20. File:CDPHE Industrial Individual Wastewater Discharge Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New Pages Recent Changes AllApschem.pdf Jump to: navigation,Boiler permit packetBreakoutCCS

  1. File:03CACEncroachmentPermit.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbHFarinelloInformationCACEncroachmentPermit.pdf Jump to: navigation,

  2. File:03CODAccessPermit (1).pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbHFarinelloInformationCACEncroachmentPermit.pdf Jump to:File

  3. Solar/Wind Permitting Standards | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity forSilicium deEnergyCompany LimitedSolar/Wind Permitting Standards

  4. Montana Domestic Sewage Treatment Lagoons General Permit | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy ResourcesDec(Pritchett, 2004)Michigan:MontanaInformation Permit Jump

  5. Nevada Application for Permit to Appropriate Water | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd JumpNesjavellir Geothermal Power1987)Information Permit to

  6. New Mexico Archaeological Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures LtdNeville, Ohio:Archaeological Permits Webpage Jump to:

  7. Oregon Air Contaminant Discharge Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.InformationImprovementsTransmission Lines |Permits Webpage

  8. Presidential Permits and Export Authorizations - About the Program |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidentialDepartment of

  9. Presidential Permits and Export Authorizations - Frequently Asked Questions

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS -Portmouth2015DepartmentPresidentialDepartment

  10. Solar and Wind Permitting Standards | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEurope GmbH JumpSloughInfra Inc JumpSentryTorxPermitting

  11. Alaska Air Permit Program Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 - Applications JumpPermits | Open EnergyforCode

  12. Alaska DEC Water Permit Search | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 - Applications JumpPermits | Open EnergyforCodeDEC

  13. Alaska Fish Habitat Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5 - Applications JumpPermitsOpen Energy| Open2008Alaska

  14. CDOT - Permit Standard Provisions Example | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas: Energy Resources Jump to:Energy IncTool Jump to:Permit

  15. CDOT - State Highway Access Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas: Energy Resources Jump to:Energy IncTool Jump to:PermitState

  16. Construction and Minor Permit Applications | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (Utility Company)| Open(Evans, Et Al.,InformationMinor Permit Applications

  17. Form GWS-45 - Well Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdistoWhiskeyFootprint Ventures Jump to:45 - Well Permit Application Jump

  18. Draft RCRA Permit Workshop Info for HAB Presenters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalentLaboratory |Sector FullDOEUrsulaNaturalRCRA Permit Workshop

  19. Small sample feature selection 

    E-Print Network [OSTI]

    Sima, Chao

    2007-09-17

    that the correction factor is a function of the dimensionality. The estimated standard deviations for the bolstering kernels are thus given by: ?i = ˆd(yi) ?p,i , for i = 1,...,n. (2.8) Clearly, as the number of samples in the training data increases, the standard de..., the DeArray software of the National Human Genome Research Institute calculates a multi-faceted quality metric for each spot [25]. This quality problem is a result of imperfections in RNA preparation, hybridization to the arrays, scanning, and also...

  20. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700 GJO-2003-411-TACe: SUBJIHX:ontineSampling at

  1. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700 GJO-2003-411-TACe: SUBJIHX:ontineSampling

  2. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling at the

  3. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling at

  4. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling at4

  5. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling at4and

  6. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling

  7. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling Rifle,

  8. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling

  9. September 2004 Water Sampling

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the t-) S/,,5 'a C O M1 theGroundwater Sampling4

  10. DESIGN OF THE TRANSCONDUCTANCE AMPLIFIER FOR FREQUENCY DOMAIN SAMPLING RECEIVER 

    E-Print Network [OSTI]

    Chen, XI

    2010-01-16

    voltages at the source terminals of the NMOS transistors, as well as ones at gate terminals, are pretty high. The bulks of the NMOS transistors are always connected to VSS, so Vgb of those NMOS transistors might exceed the breakdown voltage. The solution...

  11. The development of radioactive sample surrogates for training and exercises

    SciTech Connect (OSTI)

    Martha Finck; Bevin Brush; Dick Jansen; David Chamberlain; Don Dry; George Brooks; Margaret Goldberg

    2012-03-01

    The development of radioactive sample surrogates for training and exercises Source term information is required for to reconstruct a device used in a dispersed radiological dispersal device. Simulating a radioactive environment to train and exercise sampling and sample characterization methods with suitable sample materials is a continued challenge. The Idaho National Laboratory has developed and permitted a Radioactive Response Training Range (RRTR), an 800 acre test range that is approved for open air dispersal of activated KBr, for training first responders in the entry and exit from radioactively contaminated areas, and testing protocols for environmental sampling and field characterization. Members from the Department of Defense, Law Enforcement, and the Department of Energy participated in the first contamination exercise that was conducted at the RRTR in the July 2011. The range was contaminated using a short lived radioactive Br-82 isotope (activated KBr). Soil samples contaminated with KBr (dispersed as a solution) and glass particles containing activated potassium bromide that emulated dispersed radioactive materials (such as ceramic-based sealed source materials) were collected to assess environmental sampling and characterization techniques. This presentation summarizes the performance of a radioactive materials surrogate for use as a training aide for nuclear forensics.

  12. Entanglement sampling and applications

    E-Print Network [OSTI]

    Frédéric Dupuis; Omar Fawzi; Stephanie Wehner

    2015-06-15

    A natural measure for the amount of quantum information that a physical system E holds about another system A = A_1,...,A_n is given by the min-entropy Hmin(A|E). Specifically, the min-entropy measures the amount of entanglement between E and A, and is the relevant measure when analyzing a wide variety of problems ranging from randomness extraction in quantum cryptography, decoupling used in channel coding, to physical processes such as thermalization or the thermodynamic work cost (or gain) of erasing a quantum system. As such, it is a central question to determine the behaviour of the min-entropy after some process M is applied to the system A. Here we introduce a new generic tool relating the resulting min-entropy to the original one, and apply it to several settings of interest, including sampling of subsystems and measuring in a randomly chosen basis. The sampling results lead to new upper bounds on quantum random access codes, and imply the existence of "local decouplers". The results on random measurements yield new high-order entropic uncertainty relations with which we prove the optimality of cryptographic schemes in the bounded quantum storage model.

  13. NOAA Policy for Assessment of Penalties and Permit Sanctions March 16, 2011 Page 1 of 56 Policy for the Assessment of Civil Administrative Penalties and Permit Sanctions

    E-Print Network [OSTI]

    NOAA Policy for Assessment of Penalties and Permit Sanctions ­ March 16, 2011 ­ Page 1 of 56 Policy ­ Enforcement and Litigation I. Statement of Scope and Purpose This Policy provides guidance for the assessment. The purpose of this Policy is to ensure that: (1) civil administrative penalties and permit sanctions

  14. Sample holder with optical features

    DOE Patents [OSTI]

    Milas, Mirko; Zhu, Yimei; Rameau, Jonathan David

    2013-07-30

    A sample holder for holding a sample to be observed for research purposes, particularly in a transmission electron microscope (TEM), generally includes an external alignment part for directing a light beam in a predetermined beam direction, a sample holder body in optical communication with the external alignment part and a sample support member disposed at a distal end of the sample holder body opposite the external alignment part for holding a sample to be analyzed. The sample holder body defines an internal conduit for the light beam and the sample support member includes a light beam positioner for directing the light beam between the sample holder body and the sample held by the sample support member.

  15. RCRA Permit for a Hazardous Waste Management Facility, Permit Number NEV HW0101, Annual Summary/Waste Minimization Report

    SciTech Connect (OSTI)

    Arnold, Patrick

    2014-02-14

    This report summarizes the EPA identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  16. Evaluating Radionuclide Air Emission Stack Sampling Systems

    SciTech Connect (OSTI)

    Ballinger, Marcel Y.

    2002-12-16

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R&D) facilities for the U.S. Department of Energy at the Hanford Site, Washington. These facilities are subject to Clean Air Act regulations that require sampling of radionuclide air emissions from some of these facilities. A revision to an American National Standards Institute (ANSI) standard on sampling radioactive air emissions has recently been incorporated into federal and state regulations and a re-evaluation of affected facilities is being performed to determine the impact. The revised standard requires a well-mixed sampling location that must be demonstrated through tests specified in the standard. It also carries a number of maintenance requirements, including inspections and cleaning of the sampling system. Evaluations were performed in 2000 – 2002 on two PNNL facilities to determine the operational and design impacts of the new requirements. The evaluation included inspection and cleaning maintenance activities plus testing to determine if the current sampling locations meet criteria in the revised standard. Results show a wide range of complexity in inspection and cleaning activities depending on accessibility of the system, ease of removal, and potential impact on building operations (need for outages). As expected, these High Efficiency Particulate Air (HEPA)-filtered systems did not show deposition significant enough to cause concerns with blocking of the nozzle or other parts of the system. The tests for sampling system location in the revised standard also varied in complexity depending on accessibility of the sample site and use of a scale model can alleviate many issues. Previous criteria to locate sampling systems at eight duct diameters downstream and two duct diameters upstream of the nearest disturbances is no guarantee of meeting criteria in the revised standard. A computational fluid dynamics model was helpful in understanding flow and contaminant mixing in an exhaust system and may be useful to identify potential sampling locations in an exhaust system that are likely to meet criteria in the revised standard.

  17. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Chapter D, Appendix D1 (conclusion), Revision 3

    SciTech Connect (OSTI)

    Cook, Neville G.W.; Heuze, Francois E.; Miller, Hamish D.S.; Thoms, Robert L.

    1993-03-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.

  18. Relationship between classifier performance and distributional complexity for small samples 

    E-Print Network [OSTI]

    Attoor, Sanju Nair

    2004-11-15

    Given a limited number of samples for classification, several issues arise with respect to design, performance and analysis of classifiers. This is especially so in the case of microarray-based classification. In this paper, we use a complexity...

  19. Acid Fracture and Fracture Conductivity Study of Field Rock Samples 

    E-Print Network [OSTI]

    Underwood, Jarrod

    2013-11-15

    Acid fracturing is a well stimulation strategy designed to increase the productivity of a producing well. The parameters of acid fracturing and the effects of acid interaction on specific rock samples can be studied experimentally. Acid injection...

  20. Fluid sampling tool

    DOE Patents [OSTI]

    Johnston, Roger G. (Los Alamos, NM); Garcia, Anthony R. E. (Espanola, NM); Martinez, Ronald K. (Santa Cruz, NM)

    2001-09-25

    The invention includes a rotatable tool for collecting fluid through the wall of a container. The tool includes a fluid collection section with a cylindrical shank having an end portion for drilling a hole in the container wall when the tool is rotated, and a threaded portion for tapping the hole in the container wall. A passageway in the shank in communication with at least one radial inlet hole in the drilling end and an opening at the end of the shank is adapted to receive fluid from the container. The tool also includes a cylindrical chamber affixed to the end of the shank opposite to the drilling portion thereof for receiving and storing fluid passing through the passageway. The tool also includes a flexible, deformable gasket that provides a fluid-tight chamber to confine kerf generated during the drilling and tapping of the hole. The invention also includes a fluid extractor section for extracting fluid samples from the fluid collecting section.

  1. SAMPLE (Sandia Agile MEMS Prototyping, Layout tools, and Education)

    SciTech Connect (OSTI)

    Davies, B.R.; Barron, C.C.; Sniegowski, J.J.; Rodgers, M.S.

    1997-08-01

    The SAMPLE (Sandia Agile MEMS Protyping, Layout tools, and Education) service makes Sandia`s state-of-the-art surface-micromachining fabrication process, known as SUMMiT, available to US industry for the first time. The service provides a short cause and customized computer-aided design (CAD) tools to assist customers in designing micromachine prototypes to be fabricated in SUMMiT. Frequent small-scale manufacturing runs then provide SAMPLE designers with hundreds of sophisticated MEMS (MicroElectroMechanical Systems) chips. SUMMiT (Sandia Ultra-planar, Multi-level MEMS Technology) offers unique surface-micromachining capabilities, including four levels of polycrystalline silicon (including the ground layer), flanged hubs, substrate contacts, one-micron design rules, and chemical-mechanical polishing (CMP) planarization. This paper describes the SUMMiT process, design tools, and other information relevant to the SAMPLE service and SUMMiT process.

  2. SHORT PROGRAMS Materials By Design

    E-Print Network [OSTI]

    Entekhabi, Dara

    techniques including 3D printing, self-assembly, microfluidics and other technologies. We will distribute and analyze material samples designed based on multiscale simulations and manufactured using 3D printing

  3. THREE-PEE SAMPLING THEORY and program `THRP'

    E-Print Network [OSTI]

    OF ALREADY BEING ON PUNCHED CARDS. ON A MORE ELEMENTARY LEVEL, H. P. LUHN'S INGENIOUS 11-CHARACTER DOCUMENT IDENTIFIER (FAMILIAR TO USERS OF PERMUTED 'KWIC' INDICES) PROVIDES AN EXCELLENT TOOL FOR VISUAL, MECHANICAL-SAMPLE ESTIMATES --------- 14 SOME CONSIDERATIONS IN 3P-SAMPLE DESIGN -------------- 25 3P

  4. Carbon tax or carbon permits: The impact on generators' risks

    SciTech Connect (OSTI)

    Green, R.

    2008-07-01

    Volatile fuel prices affect both the cost and price of electricity in a liberalized market. Generators with the price-setting technology will face less risk to their profit margins than those with costs that are not correlated with price, even if those costs are not volatile. Emissions permit prices may respond to relative fuel prices, further increasing volatility. This paper simulates the impact of this on generators' profits, comparing an emissions trading scheme and a carbon tax against predictions for the UK in 2020. The carbon tax reduces the volatility faced by nuclear generators, but raises that faced by fossil fuel stations. Optimal portfolios would contain a higher proportion of nuclear plant if a carbon tax was adopted.

  5. Validation of Innovative Exploration Technologies for Newberry Volcano: Map showing location of wells permitted, drilled and seismic test 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    2012-01-01

    Innovative Exploration Technologies for Newberry Volcano: Map showing location of wells permitted, drilled & seismic test, 2012

  6. Validation of Innovative Exploration Technologies for Newberry Volcano: Map showing location of wells permitted, drilled and seismic test 2012

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jaffe, Todd

    Innovative Exploration Technologies for Newberry Volcano: Map showing location of wells permitted, drilled & seismic test, 2012

  7. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect (OSTI)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  8. US Army Corps of Engineers Section 404: permitting of valley fills - red flag or red tape?

    SciTech Connect (OSTI)

    Thomas R. Johnston, Jr. [Skelly & Loy (United States)

    2009-03-15

    Since 2001 the US Army Corps of Engineers has been permitting most surface coal mines as Individual Permits rather than Nationwide Permits under the Section 404 program. This was shown in a survey by Skelly & Loy of permits published by Huntingdon Crops District and the state of Kentucky. Nationwide Permit 21 (NWP21) authorises the filling of waters of the United States associated with surface coal mining and reclamation operations already authorised or currently being processed as part of the integrated permit processing procedure. NWP21 has received much opposition and two noticeable court cases involving it, in West Virginia and Kentucy, are briefly reported. The article first appeared in Skelly & Loy's newsletter, Portal to the mining industry, Vol II, Issue 1. 4 photos.

  9. Stratified random sampling plan for an irrigation customer telephone survey

    SciTech Connect (OSTI)

    Johnston, J.W.; Davis, L.J.

    1986-05-01

    This report describes the procedures used to design and select a sample for a telephone survey of individuals who use electricity in irrigating agricultural cropland in the Pacific Northwest. The survey is intended to gather information on the irrigated agricultural sector that will be useful for conservation assessment, load forecasting, rate design, and other regional power planning activities.

  10. New designs in the reconstruction of coke-sorting systems

    SciTech Connect (OSTI)

    A.S. Larin; V.V. Demenko; V.L. Voitanik [Giprokoks, the State Institute for the Design of Coke-Industry Enterprises, Kharkov (Ukraine)

    2009-07-15

    In recent Giprokoks designs for the reconstruction of coke-sorting systems, high-productivity vibrational-inertial screens have been employed. This permits single-stage screening and reduction in capital and especially operating expenditures, without loss of coke quality. In two-stage screening, >80 mm coke (for foundry needs) is additionally separated, with significant improvement in quality of the metallurgical coke (25-80 mm). New designs for the reconstruction of coke-sorting systems employ mechanical treatment of the coke outside the furnace, which offers new scope for stabilization of coke quality and permits considerable improvement in mechanical strength and granulometric composition of the coke by mechanical crushing.

  11. Permits and Easements for Construction and Related Activities on Public Lands and Waters (Iowa)

    Broader source: Energy.gov [DOE]

    These rules establish procedures and regulate the evaluation and issuance of permits for construction or other related activities that alter the physical characteristics of public lands and waters...

  12. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation...

  13. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Comments of the Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company:...

  14. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission...

  15. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in...

  16. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4...

  17. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company:...

  18. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Comments of the Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities...

  19. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company:...

  20. V-026: RSA Data Protection Manager Bugs Permit Cross-Site Scripting...

    Broader source: Energy.gov (indexed) [DOE]

    RSA Data Protection Manager Bugs Permit Cross-Site Scripting Attacks and Let Local Users Bypass Security Restrictions. PLATFORM: RSA Data Protection Manager Appliance versions...

  1. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  2. Application for Presidential Permit PP-400 TDI-NE - New England...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - New England Clean Power Link Project - Motion to Intervene and Comments of the Vermont Department of Public Service - August 6, 2014 Application for Presidential Permit...

  3. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New York Independent System Operator Inc Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System...

  4. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Late Motion to Intervene of New York Transmission Owners Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to...

  5. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Letter from New York Transmission Owners Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners...

  6. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Supplemental Comments of the Independent Electricity System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental...

  7. Germanium-76 Sample Analysis: Revision 3

    SciTech Connect (OSTI)

    Kouzes, Richard T.; Zhu, Zihua; Engelhard, Mark H.

    2011-09-19

    The MAJORANA DEMONSTRATOR is a large array of ultra-low background high-purity germanium detectors, enriched in 76Ge, designed to search for zero-neutrino double-beta decay (0{nu}{beta}{beta}). The DEMONSTRATOR will utilize 76Ge from Russia. The first one-gram sample was received from the supplier for analysis on April 24, 2011. The second one-gram sample was received from the supplier for analysis on July 12, 2011. The third sample, which came from the first large shipment of germanium from the vendor, was received from Oak Ridge National Laboratory (ORNL) on September 13, 2011. The Environmental Molecular Sciences facility, a DOE user facility at PNNL, was used to make the required isotopic and chemical purity measurements that are essential to the quality assurance for the MAJORANA DEMONSTRATOR. The results of these analyses are reported here. The isotopic composition of a sample of natural germanium was also measured twice. Differences in the result between these two measurements led to a re-measurement of the second 76Ge sample.

  8. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  9. Broadband sample holder for microwave spectroscopy of superconducting qubits

    SciTech Connect (OSTI)

    Averkin, A. S.; Karpov, A.; Glushkov, E.; Abramov, N. [National University of Science and Technology (MISIS), Leninskiy prosp. 4, Moscow, 119049 (Russian Federation); Shulga, K. [National University of Science and Technology (MISIS), Leninskiy prosp. 4, Moscow, 119049 (Russian Federation); Russian Quantum Center (RQC), 100 Novaya St., Skolkovo, Moscow region, 143025 (Russian Federation); Huebner, U. [Leibniz Institute of Photonic Technology (IPHT), PO Box 100239, D-07702 Jena (Germany); Il'ichev, E. [Russian Quantum Center (RQC), 100 Novaya St., Skolkovo, Moscow region, 143025 (Russian Federation); Leibniz Institute of Photonic Technology (IPHT), PO Box 100239, D-07702 Jena (Germany); Ustinov, A. V. [National University of Science and Technology (MISIS), Leninskiy prosp. 4, Moscow, 119049 (Russian Federation); Russian Quantum Center (RQC), 100 Novaya St., Skolkovo, Moscow region, 143025 (Russian Federation); Physikalisches Institut, Karlsruhe Institute of Technology (KIT), D-76131 Karlsruhe (Germany)

    2014-10-15

    We present a practical design and implementation of a broadband sample holder suitable for microwave experiments with superconducting integrated circuits at millikelvin temperatures. Proposed design can be easily integrated in standard dilution cryostats, has flat pass band response in a frequency range from 0 to 32 GHz, allowing the RF testing of the samples with substrate size up to 4 × 4 mm{sup 2}. The parasitic higher modes interference in the holder structure is analyzed and prevented via design considerations. The developed setup can be used for characterization of superconducting parametric amplifiers, bolometers, and qubits. We tested the designed sample holder by characterizing of a superconducting flux qubit at 20 mK temperature.

  10. Review of the Physical Science Facility Stack Air Sampling Probe Locations

    SciTech Connect (OSTI)

    Glissmeyer, John A.

    2007-09-30

    This letter report reviews compliance of the current design of the Physical Science Facility (PSF) stack air sampling locations with the ANSI/HPS N13.1-1999 standard. The review was based on performance criteria used for locating air sampling probes, the design documents provided and available information on systems previously tested for compliance with the criteria. Recommendations are presented for ways to bring the design into compliance with the requirements for the sampling probe placement.

  11. Engitectural Design 

    E-Print Network [OSTI]

    Gagliardi, D. R.

    1996-01-01

    to the mechanical systems of building, and in a hot and humid climate the issues are magnified. Therefore, this paper will discuss the concepts and merits of a new design process called: Engitectural Design. Engitectural Design is the concept of blending the many...

  12. RESULTS FOR THE SECOND QUARTER 2011 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Eibling, R.

    2011-08-25

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, the DDA (Deliquification, Dissolution, and Adjustment) process, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are listed in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Second Quarter samples collected from Tank 50 on April 4, 2011 and discusses those results in further detail than the previously issued results report. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limit for {sup 59}Ni is above the requested limit from Reference 2 but below the established limit in Reference 3. (3) The reported detection limit for {sup 94}Nb is above the requested limit from Reference 2; however, it is below the established limits in Reference 3. (4) The reported concentration of {sup 242m}Am is above the target in Listed in Attachment 8.4 of the Saltstone WAC. (5) {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (6) The reported detection limit for Norpar 13{sup 5} is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (7) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (8) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the instrument; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

  13. Landfill Expansion and Permit Revision FEIR Addendum #1 2003 LRDP FEIR Addendum #2

    E-Print Network [OSTI]

    Ullrich, Paul

    and post-closure maintenance activities for Waste Management Unit 2 (WMU2) at the UC Davis campus landfillUC Davis Landfill Expansion and Permit Revision FEIR ­ Addendum #1 2003 LRDP FEIR ­ Addendum #2 August 2011 Page 1 1 August 2011 ADDENDUM #1 TO THE LANDFILL EXPANSION AND PERMIT REVISION FEIR (State

  14. Carbon Permit Prices in the European Emissions Trading System: A Stochastic Analysis

    E-Print Network [OSTI]

    Carbon Permit Prices in the European Emissions Trading System: A Stochastic Analysis By Wee Chiang, Technology and Policy Program 1 #12;Carbon Permit Prices in the European Emissions Trading System Abstract The Emission Trading Scheme (ETS) is a cornerstone for European efforts to reduce greenhouse gas

  15. New search tool helps in fight against child porn, permits quick capture of e-criminals

    E-Print Network [OSTI]

    Fung, Benjamin C. M.

    New search tool helps in fight against child porn, permits quick capture of e-criminals Gaby Dagher Desjardins When local police came calling with child porn allegations last January, former Saint John city to the identified criminal topics, and "New search tool helps in fight against child porn, permits quick capture

  16. McMASTER UNIVERSITY Complete Policy Title: EXPORT & IMPORT PERMITS and CONTROLS

    E-Print Network [OSTI]

    Thompson, Michael

    McMASTER UNIVERSITY Complete Policy Title: EXPORT & IMPORT PERMITS and CONTROLS Policy Number (if. PURPOSE To ensure the regulations governing the export & import of goods (Export and Import Permits Act) are followed. 2. RESPONSIBILITY Before importing or exporting, it is the responsibility of the department

  17. Coordinating Permit Offices and the Development of Utility-Scale Geothermal

    E-Print Network [OSTI]

    Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy 2013 Geothermal-Scale Geothermal Overview 1. Background and other Analysis 2. Specific Coordinating Permit Office Examples 3 and the Development of Utility-Scale Geothermal Background 2011 Islandbanki Report · Report stated on average

  18. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  19. RENEWABLE ENERGY ACTION TEAM Milestones to Permit California Renewable Portfolio Standard Energy Projects

    E-Print Network [OSTI]

    1 RENEWABLE ENERGY ACTION TEAM Milestones to Permit California Renewable Portfolio Standard Energy renewable energy resources. In November 2008, the CEC, DFG, the Bureau of Land Management (BLM the Renewable Energy Action Team (REAT) to address permitting issues associated with specific renewable energy

  20. Power Maximization in Wave-Energy Converters Using Sampled -Data Extremum Seeking /

    E-Print Network [OSTI]

    Chen, Tianjia

    2013-01-01

    Power Maximization in Wave-Energy Converters Using Sampled-design optimization of wave energy converters con- sistingN. Sahinkaya. A review of wave energy converter technology.

  1. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Mike Lewis

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  2. Hanford site transuranic waste sampling plan

    SciTech Connect (OSTI)

    GREAGER, T.M.

    1999-05-13

    This sampling plan (SP) describes the selection of containers for sampling of homogeneous solids and soil/gravel and for visual examination of transuranic and mixed transuranic (collectively referred to as TRU) waste generated at the U.S. Department of Energy (DOE) Hanford Site. The activities described in this SP will be conducted under the Hanford Site TRU Waste Certification Program. This SP is designed to meet the requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (CAO-94-1010) (DOE 1996a) (QAPP), site-specific implementation of which is described in the Hanford Site Transuranic Waste Characterization Program Quality Assurance Project Plan (HNF-2599) (Hanford 1998b) (QAPP). The QAPP defines the quality assurance (QA) requirements and protocols for TRU waste characterization activities at the Hanford Site. In addition, the QAPP identifies responsible organizations, describes required program activities, outlines sampling and analysis strategies, and identifies procedures for characterization activities. The QAPP identifies specific requirements for TRU waste sampling plans. Table 1-1 presents these requirements and indicates sections in this SP where these requirements are addressed.

  3. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1995-04-28

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

  4. Homeowner Soil Sample Information Form 

    E-Print Network [OSTI]

    Provin, Tony

    2007-04-11

    THE TEXAS A&M UNIVERSITY SYSTEM Soil, Water and Forage Testing Laboratory Urban and Homeowner Soil Sample Information Form See sampling procedures and mailing instructions on the back of this form. (PLEASE DO NOT SEND CASH) SU07 E-444... (7-07) Results will be mailed to this address ONLY Address City Phone County where sampled Name Laboratory # (For Lab Use Only) State Zip Payment (DO NOT SEND CASH). Amount Paid $ SUBMITTED BY: Check Money Order Make Checks Payable to: Soil...

  5. Acceptance sampling using judgmental and randomly selected samples

    SciTech Connect (OSTI)

    Sego, Landon H.; Shulman, Stanley A.; Anderson, Kevin K.; Wilson, John E.; Pulsipher, Brent A.; Sieber, W. Karl

    2010-09-01

    We present a Bayesian model for acceptance sampling where the population consists of two groups, each with different levels of risk of containing unacceptable items. Expert opinion, or judgment, may be required to distinguish between the high and low-risk groups. Hence, high-risk items are likely to be identifed (and sampled) using expert judgment, while the remaining low-risk items are sampled randomly. We focus on the situation where all observed samples must be acceptable. Consequently, the objective of the statistical inference is to quantify the probability that a large percentage of the unsampled items in the population are also acceptable. We demonstrate that traditional (frequentist) acceptance sampling and simpler Bayesian formulations of the problem are essentially special cases of the proposed model. We explore the properties of the model in detail, and discuss the conditions necessary to ensure that required samples sizes are non-decreasing function of the population size. The method is applicable to a variety of acceptance sampling problems, and, in particular, to environmental sampling where the objective is to demonstrate the safety of reoccupying a remediated facility that has been contaminated with a lethal agent.

  6. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  7. Sample Residential Program Term Sheet

    Broader source: Energy.gov [DOE]

    A sample for defining and elaborating on the specifics of a clean energy loan program. Author: U.S. Department of Energy

  8. Adaptive Sampling for Environmental Robotics

    E-Print Network [OSTI]

    Mohammad Rahimi; Richard Pon; Deborah Estrin; William J. Kaiser; Mani Srivastava; Gaurav S. Sukhatme

    2003-01-01

    186, 2003. S. Thrun, “Robotics Mapping: A survey”, Exploringtechnique to environmental robotics applications includingSampling for Environmental Robotics Mohammad Rahimi †,‡‡ ,

  9. Permitting plan for the immobilized low-activity waste project

    SciTech Connect (OSTI)

    Deffenbaugh, M.L.

    1997-09-04

    This document addresses the environmental permitting requirements for the transportation and interim storage of the Immobilized Low-Activity Waste (ILAW) produced during Phase 1 of the Hanford Site privatization effort. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage and disposal of Tank Waste Remediation Systems (TWRS) immobilized low-activity tank waste (ILAW) and (2) interim storage of TWRS immobilized HLW (IHLW) and other canistered high-level waste forms. Low-activity waste (LAW), low-level waste (LLW), and high-level waste (HLW) are defined by the TWRS, Hanford Site, Richland, Washington, Final Environmental Impact Statement (EIS) DOE/EIS-0189, August 1996 (TWRS, Final EIS). By definition, HLW requires permanent isolation in a deep geologic repository. Also by definition, LAW is ``the waste that remains after separating from high-level waste as much of the radioactivity as is practicable that when solidified may be disposed of as LLW in a near-surface facility according to the NRC regulations.`` It is planned to store/dispose of (ILAW) inside four empty vaults of the five that were originally constructed for the Group Program. Additional disposal facilities will be constructed to accommodate immobilized LLW packages produced after the Grout Vaults are filled. The specifications for performance of the low-activity vitrified waste form have been established with strong consideration of risk to the public. The specifications for glass waste form performance are being closely coordinated with analysis of risk. RL has pursued discussions with the NRC for a determination of the classification of the Hanford Site`s low-activity tank waste fraction. There is no known RL action to change law with respect to onsite disposal of waste.

  10. Hazard Sampling Dialog General Layout

    E-Print Network [OSTI]

    Zhang, Tao

    1 Hazard Sampling Dialog General Layout The dialog's purpose is to display information about the hazardous material being sampled by the UGV so either the system or the UV specialist can identify the risk level of the hazard. The dialog is associated with the hazmat reading icons (Table 1). Components

  11. Database Sampling with Functional Dependencies

    E-Print Network [OSTI]

    Riera, Jesús Bisbal

    Database Sampling with Functional Dependencies Jes´us Bisbal, Jane Grimson Department of Computer there is a need to prototype the database which the applications will use when in operation. A prototype database can be built by sampling data from an existing database. Including relevant semantic information when

  12. To create a Virtual Design Environment, leveraging tools from musculoskeletal analysis, optimization, simulation-based design, that

    E-Print Network [OSTI]

    Krovi, Venkat

    Systems. How to evaluate the effects of ergonomics & regimen for a rehabilitation program? How to refine, optimization, simulation-based design, that will permit a therapist to systematically and rapidly evaluate of such functional interactions are geometric placementgeometric placement of useruser-- device (ergonomics

  13. Sampling Report for August 15, 2014 WIPP Samples

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and pulley system was constructed to move a camera for documentation and close-up pictures. The sampling device is located at the end of the boom. (Note, this picture is from...

  14. RESULTS FOR THE THIRD QUARTER 2007 TANK 50H WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

    SciTech Connect (OSTI)

    Zeigler, K; Ned Bibler, N

    2008-07-11

    The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low activity wastewater streams from the Effluent Treatment Project (ETP), H-Canyon, and the high level waste (HLW) storage tanks, are stored as a mixture in Tank 50H until it can be pumped to the Saltstone Facility for treatment and disposal. Specific waste acceptance criteria (WAC) must be met for the transfer of low-level aqueous waste from Tank 50H to the Saltstone Facility. Low level waste which meets the WAC can be transferred, stored and treated in the Saltstone Production Facility (SPF) for subsequent disposal as saltstone in the Saltstone Disposal Facility (SDF). Waste Solidification Engineering (WSE) has requested through a Technical Task Request (TTR) that the Savannah River National Laboratory (SRNL) measure the concentrations of chemical and radionuclide contaminants listed in the currently approved Saltstone Waste Acceptance Criteria (WAC). A Task Technical and Quality Assurance Plan and Analytical Study Plan has been written for this request. WAC determinations are needed on a quarterly basis for chemical contaminants and every first and third quarter for radioactive contaminants. This memorandum presents the results for the chemical and radionuclide contaminants in the third quarter, from the samples taken from Tank 50 in September, 2007.

  15. Wastewater Land Application Permit LA-000141 Renewal Information for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    none,

    1999-02-01

    On July 25, 1994, the State of ldaho Division of Environmental Quality issued a Wastewater Land Application Permit, #LA-000141-01, for the Central Facilities Area Sewage Treatment Plant. The permit expires August 7, 1999. This report is being submitted with the renewal application and specifically addresses; Wastewater flow; Wastewater characteristics; Impacts to vegetation in irrigation area; Impacts to soil in irrigation area; Evaluation of groundwater monitoring wells for Wastewater Land Application Permit purposes; Summary of trends observed during the 5-year reporting period; and Projection of changes and new processes.

  16. Mechanizing Exploratory Game Design

    E-Print Network [OSTI]

    Smith, Adam Marshall

    2012-01-01

    Game Design . . . . . . . . . . . . . . . . . . . . . . . .1.4.1 Designlevel Design Spaces . . . . . . . . . . . . . . . . . . . .

  17. Parking Lot Update Construction on campus has led to changes in the designations of some parking lots. Many of the "E

    E-Print Network [OSTI]

    Capecchi, Mario R.

    Parking Lot Update Construction on campus has led to changes in the designations of some parking" permits to park during the summer semester, we will honor "E" permits in these lots until fall semester begins August 25th . If you have been parking in one of the lots that changed, here are a few

  18. Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

    SciTech Connect (OSTI)

    Vigil-Holterman, Luciana R.; Lechel, Robert A.

    2012-08-31

    The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

  19. Parking Information Sheet 1. Salary sacrificing for on-campus parking permits is available to all full-time continuing

    E-Print Network [OSTI]

    Parking Information Sheet 1. Salary sacrificing for on-campus parking permits is available to all. 4. The application for salary sacrificing does not include an application for a parking permit. Staff members who wish to salary sacrifice their parking permit fee must first apply to Parking

  20. Visual Sample Plan Version 7.0 User's Guide

    SciTech Connect (OSTI)

    Matzke, Brett D.; Newburn, Lisa LN; Hathaway, John E.; Bramer, Lisa M.; Wilson, John E.; Dowson, Scott T.; Sego, Landon H.; Pulsipher, Brent A.

    2014-03-01

    User's guide for VSP 7.0 This user's guide describes Visual Sample Plan (VSP) Version 7.0 and provides instructions for using the software. VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 7.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sites suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (XP, Vista, Windows 7, and Windows 8). Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem/rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for unexploded ordnance (UXO) identification.

  1. Depth-discrete sampling port

    DOE Patents [OSTI]

    Pemberton, Bradley E. (Aiken, SC); May, Christopher P. (Columbia, MD); Rossabi, Joseph (Aiken, SC); Riha, Brian D. (Augusta, GA); Nichols, Ralph L. (North Augusta, SC)

    1998-07-07

    A sampling port is provided which has threaded ends for incorporating the port into a length of subsurface pipe. The port defines an internal receptacle which is in communication with subsurface fluids through a series of fine filtering slits. The receptacle is in further communication through a bore with a fitting carrying a length of tubing there which samples are transported to the surface. Each port further defines an additional bore through which tubing, cables, or similar components of adjacent ports may pass.

  2. WINDExchange Webinar: Wind Energy and Eagles: The Problem, the Permit, and the Path Forward

    Office of Energy Efficiency and Renewable Energy (EERE)

    Save the date for this free webinar. Wally Erickson of WEST, Inc. will present on the conservation and permitting challenges associated with wind and eagles; Annie Mudge of Cox, Castle &...

  3. 33 CFR 322: Permits for Structures or Work in or Affecting Navigable...

    Open Energy Info (EERE)

    33 CFR 322: Permits for Structures or Work in or Affecting Navigable Waters of the United States Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  4. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Out of Time and Comments of PEPCO Holdings, INC. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time...

  5. 23 V.S.A. Section 1400 Permit to Operate in excess of Weight...

    Open Energy Info (EERE)

    HighwaysLegal Abstract Sets forth requirements for issuing permits for operating a motor vehicle in excess of weight and size limits. Published NA Year Signed or Took Effect...

  6. Vermont Single Trip Permit to Operate a Motor Vehicle in Excess...

    Open Energy Info (EERE)

    Vermont Single Trip Permit to Operate a Motor Vehicle in Excess of Statutory Weight or Dimension Limits (Form OSD-002) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  7. EU-California Environmental Agreements: The Role of Trade in Emissions Permits and Escape Clauses

    E-Print Network [OSTI]

    Karp, Larry; Zhao, Jinhua

    2008-01-01

    stand how the structure of an IEA alters those obstacles. Inmodi?cations to the simple IEA. Section 3 examines the roleTrade in permits can promote IEA membership, by using the

  8. Application for presidential permit OE Docket No. PP-235-1 Sempra...

    Broader source: Energy.gov (indexed) [DOE]

    U.S LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-235-1 Sempra Energy...

  9. V-084: RSA Archer eGRC Permits Cross-Site Scripting, Cross-Domain...

    Office of Environmental Management (EM)

    EMC RSA Archer GRC Open Redirection Weakness and Security Bypass Security Issue U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks...

  10. U-212: RSA Authentication Manager Flaws Permit Cross-Site and...

    Office of Environmental Management (EM)

    Cross-Site Scripting Attacks U-129: RSA enVision Bugs Permit Cross-Site Scripting, SQL Injection, and Directory Traversal Attacks V-026: RSA Data Protection Manager Bugs...

  11. 5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution...

    Open Energy Info (EERE)

    5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  12. File:5 CCR 1001-5 Colorado Stationary Source Permitting and Air...

    Open Energy Info (EERE)

    Up Search File Edit History File:5 CCR 1001-5 Colorado Stationary Source Permitting and Air Pollution Control Emission Notice Requirements.pdf Jump to: navigation, search File...

  13. V-124: Splunk Web Input Validation Flaw Permits Cross-Site Scripting...

    Broader source: Energy.gov (indexed) [DOE]

    Splunk Web Input Validation Flaw Permits Cross-Site Scripting Attacks PLATFORM: Version(s): 4.3.0 through 4.3.5 ABSTRACT: A vulnerability was reported in Splunk Web. REFERENCE...

  14. V-112: Microsoft SharePoint Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flaws Permit Cross-Site Scripting Attacks U-276: VMware vCenter Operations Cross-Site Scripting Vulnerability V-119: IBM Security AppScan Enterprise Multiple Vulnerabilities...

  15. U.A.C. R315-3: Application and Permit Procedures for Hazardous...

    Open Energy Info (EERE)

    U.A.C. R315-3: Application and Permit Procedures for Hazardous Waste Treatment, Storage, and Disposal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  16. U-255: Apache Wicket Input Validation Flaw Permits Cross-Site...

    Broader source: Energy.gov (indexed) [DOE]

    Wicket Input Validation Flaw Permits Cross-Site Scripting Attacks PLATFORM: Apache Software Foundation Apache Wicket 1.5.5 Apache Software Foundation Apache Wicket 1.5-RC5.1...

  17. NMAC 4.10.11 Issuance of Permits to Excavate Unmarked Human Burials...

    Open Energy Info (EERE)

    NMAC 4.10.11 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for NMAC 4.10.11 Issuance of Permits to Excavate Unmarked Human Burials in...

  18. City of San Jose- Solar Hot Water Heaters and Photovoltaic Systems Permit Requirements

    Broader source: Energy.gov [DOE]

    Building, Planning and Electrical Permits are required for Photovoltiac (PV) systems installed in San Jose. In most cases, PV systems must also undergo a Building Plan Review and an Electrical...

  19. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

  20. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.