1

230 kV operation of a substation designed for 115 kV by controlling voltage transients  

SciTech Connect

Arresters applied at the terminals of gas insulated substations have been used successfully for protection from switching and lightning surges. This arrester application for gas insulated substations permits the use of lower insulation levels and therefore more economical substations. In principle, the same technique can be applied to air insulated substations. This paper describes the analysis of transient voltages in a substation designed for 115 kV which is scheduled for operation at 230 kV. Both arrester rating and location are considered in this analysis. It is shown that complete substation protection is possible by addition of both arresters and capacitors.

Lannes, W.J.; Cheramie, W.J.; Priest, K.W.; Wilhelm, M.R.

1984-09-01T23:59:59.000Z

2

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

3

Solid-State Fault Current Limiter Development: Design of a 15.5-kV Field-Ready Unit  

Science Conference Proceedings (OSTI)

The solid-state current limiter (SSCL) is power-electronics-based equipment designed to work with the present utility system. The SSCL monitors the line current and dynamically inserts additional impedance into the line if a fault is detected. The SSCL is based on a modular design and can be configured for 5-kV through 69-kV systems at nominal current ratings of 1000A–4000A.In this report, a complete design is presented for 15.5-kV, 1200A and 4000A, single-phase and three-phase ...

2013-02-14T23:59:59.000Z

4

Design of the Atlas 240 kV Marx modules  

DOE Green Energy (OSTI)

A prototype 240 kV, oil-insulated Marx module has been designed and constructed at the Los Alamos National Laboratory (LANL). The prototype will be used for testing and certifying the design of the Marx module and certain components, including the closing switches, series resistor, and the capacitors themselves. The prototype will also be used to evaluate proposed mechanical systems designs. Information gained from the construction and testing of the 4-capacitor prototype will be folded into the design of the 16-capacitor maintenance unit. The prototype module consists of four 60 kV capacitors, two closing switches, one shunt resistor, and one series resistor. Cables are used to deliver the current to a dummy load scaled to match Atlas system parameters. The Marx unit is contained in a structure made from G-10, suspended from a steel frame that also serves to support components of the trigger, charging, and control system. Appropriate safety and charging systems are an integral part of the prototype design.

Bowman, D.W.; Bennett, G.; Biehl, F. [and others

1997-06-01T23:59:59.000Z

5

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

6

Wood substation design beats out steel. [Conversion of 115-kV to 230 kV substations at Carolina Power and Light Co  

SciTech Connect

Construction plans for voltage conversion of substations can lead to new designs that are economical, reduce outage times, and result in minimum impacts on the environment. In fact, these factors prompted Carolina Power and Light Co. to make one such design its construction standard. Cost of converting a 115-kV distribution source substation to 230 kV is 20 percent less than that of replacing it with one of steel design. And because the conversion creates negligible environmental impact, getting government approval for the project is not a major problem. Steel is relegated to special situations.

Thompson, C.M.

1976-09-15T23:59:59.000Z

7

Design and Overview of 100 kV Bushing for the DNB Injector of ITER  

Science Conference Proceedings (OSTI)

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

2011-09-26T23:59:59.000Z

8

Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack  

Science Conference Proceedings (OSTI)

ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

Dr. Ram Adapa; Mr. Dante Piccone

2012-04-30T23:59:59.000Z

9

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

10

Insulation and radio influence dictate design of 650 kV substation  

SciTech Connect

The 650 kV North Substation of Project EHV is marked by three unusual features which differentiate it from the more familiar 230 and 345 kV substations. First, the sheer size of the apparatus, structures, and busses is striking. Second, is the amount of insulation. As represented by insulators and bushings it is proportionally much larger in lower voltage substations. Third, is the absence of sharp protrusions or angles anywhere in the substation, even on the roof of the house where corona loss is measured. Shielding is evident everywhere in the circles or ovals of smooth aluminum tubing.

Abetti, P.A.

1961-03-27T23:59:59.000Z

11

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

12

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

13

Mythology of rate design  

SciTech Connect

If power rates are determined by marginal costs with clear signals to the consumer, then the load curve will regulate itself without burdening the public with ethical and patriotic issues. Manipulation of the load factor will only cause hardship and inconvenience, but a choice of rates will allow consumers to determine their own balance between rates and convenience. It makes sense to charge consumers the true cost rather than having the same rate apply during a 24-hour period when costs are not uniform. Discussions of how to determine equitable rate structures flounder because we cannot define equity. Economists, who base their recommendations on the assumption that income distribution is reasonable, believe marginal-cost pricing allows the customer to save whatever the utility is saving. Such a system is economically efficient in that the utility charges 100 percent-load-factor consumers according to a base load plant, while charging peak and offpeak consumers what it costs to add them to the system. Adjustment of prices to cause a minimal distortion of the market is the economists' general rule for handling the balancing of cost increases and regulated profits. (DCK)

Streiter, S.H.

1977-01-01T23:59:59.000Z

14

Cable System Technology Review of XLPE EHV Cables: 220 kV to 500 kV  

Science Conference Proceedings (OSTI)

Utilities in North America are now evaluating the first long-length circuits of extruded cross-linked polyethylene (XLPE) cable systems containing many joints at rated voltages 220 kV, 230 kV, and 345 kV. Of interest is whether the design, manufacture, and installation of XLPE extra-high-voltage (EHV) cable systems has been sufficiently demonstrated to satisfy utilities that it can provide reliable service for their particular applications. This report reviews the worldwide state of the art, gives method...

2002-12-16T23:59:59.000Z

15

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Conference Proceedings (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

16

Nuclear Maintenance Applications Center: Repair and Reconditioning Specification Guidance for AC Squirrel-Cage and Salient Pole Sync hronous Motors with Voltage Ratings of 2.3 to 13.2 kV: Revision 1 of 1000897  

Science Conference Proceedings (OSTI)

The power industry is experiencing a loss of expertise as the workforce ages and some work is being outsourced to specialty suppliers. Many of the major electric motors in plants were also beginning to experience aging effects. To assist with obtaining proper motor service, EPRI published Report 1000897, Repair and Reconditioning Specification for AC Squirrel-Cage Motors with Voltage Ratings of 2.3 to 13.2 kV in 2000.

2008-12-18T23:59:59.000Z

17

Design of a 400 kV deep underground, high detector efficiency, high target density, high beam intensity accelerator facility  

E-Print Network (OSTI)

dent solid and gas-jet target stations are under design forenvelopes through the gas-jet target station beam line. Thethrough the gas-jet target station beam line. Between the

Lemut, Alberto

2012-01-01T23:59:59.000Z

18

Intraclass Price Elasticity & Electric Rate Design  

E-Print Network (OSTI)

Electric rate design relies on cost incurrance for pricing and pricing structures. However, as utilities move into a marketing mode, rate design needs to respond more to customer reactions to pricing changes. Intraclass price elasticities aid rate designers by estimating customer behavior to change. Intraclass price elasticities vary with customer usage. The more energy used by a customer, the greater the amount of elasticity. For an industrial customer, this means that all energy consumed up to the amount necessary for base operations is relatively inelastic. All energy consumption beyond this becomes more elastic as usage increases. In the book "Innovative Electric Rates," John Chamberlin and Charles Dickson utilize an economic model to test conservation programs. This model utilizes intraclass price elasticities and has a direct use in current electric rate design. The model is a strong indicator of how best a company's electric prices and pricing structures manage demand-side growth, increase energy sales consumption, and aide in non-discriminatory economic development.

Gresham, K. E.

1987-09-01T23:59:59.000Z

19

Alameda 115-kV project  

SciTech Connect

Faced with an increasing demand for electricity, the Bureau of Electricity in Alameda, California decided to investigate alternative means to increase reliability, reduce losses and provide for economic expansion of the power supply system. The investigation indicated the need for 115-kV service to interconnect the Pacific Gas and Electric Company Substation C in Oakland with the Bureau's Atlantic Substation on Alameda Island, a distance of approximately 1.5 miles. Detailed planning and design for the 115-kV project was undertaken. Extensive studies were performed to select the route and determine the design. The studies are described.

1985-01-01T23:59:59.000Z

20

Operation of a long-term transient monitoring system in a 138-KV and a 500-KV substation  

SciTech Connect

This paper describes the operating performance of automatic transient monitoring laboratories designed to capture fault and transient data on power systems. Laboratories were installed in a 138-kV and a 500-kV substation and operated for more than 25,000 hours over a three-year period. Recorded during this period were 341 events consisting of lightning, switching, and fault transients. These results provide invaluable data on actual transients in power systems to aid power system equipment designers.

Perkins, M.D.; Mauser, S.F.; Mikell, D.C.; Nilsson, S.L.

1984-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison: Final Report  

Science Conference Proceedings (OSTI)

Following up the successful testing of a complete 50 m, 115 kV high temperature superconducting (HTS) power cable system prototype, EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation undertook a project to design, install, and operate a 24 kV HTS power cable at Detroit Edison's Frisbie substation to serve customer load. The demonstration cable circuit ran approximately 120 m between the 24 kV bus distribution bus and a 120 kV-24 kV tr...

2004-12-22T23:59:59.000Z

22

Utility Rate Design Revision - A Frisbee Full of Boomerangs  

E-Print Network (OSTI)

Rising electricity prices have prompted investigation of utility rates and proposals for changed in their design. The purpose of this paper is to discuss the current design of electric rates, changes proposed, actual trends, and predictable results of the proposals and trends.

Dannenmaier, J. H.

1979-01-01T23:59:59.000Z

23

Review and evaluation of the Department of Energy's Research and Development Program for 1200-kV transmission and substation equipment  

SciTech Connect

In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. The program was oriented toward compact, compressed-gas-insulated (CGI) component design. The DOE/EES R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system. It has included more than ten major multiyear research projects and has involved numerous research, development, manufacturing, and testing organizations. This report provides a review and evaluation of the overall DOE/EES 1200-kV R and D program. It includes detailed descriptions of the major projects, their objectives, component and system design direction, and current research status. Future R and D requirements are noted, and commercialization issues are briefly discussed. Research to date has not presented any insurmountable technical obstacles to 1200-kV CGI component design. Thus, although all of the component pieces are not yet available and all of the testing is not yet complete, 1200-kV CGI-based transmission and substation equipment appears to be technically feasible. Although the substation and transmission components under development in this program will not likely reach 1200-kV system commercialization for a number of years, many of the materials and design concepts that have been identified for 1200-kV service are readily applicable to devices rated at lower voltages.

Gnadt, P.A.; Walldorf, S.P.

1985-06-01T23:59:59.000Z

24

Design criteria linear power rate-of-rise instrumentation  

SciTech Connect

Studies of reactor safety considerations have demonstrated the need for automatic safety circuit action based on the measured rate of power increase in the power level range from 10{sup {minus}2} to 10 {sup 0} times equilibrium power level. Budget and Preliminary Engineering Studies were performed. This document provides the design criteria for detailed design of the proposed Linear Power Rate-Of-Rise Instrumentation facilities and is applicable to any of the eight IPD reactors.

Herrman, B.W.

1964-01-16T23:59:59.000Z

25

HVDC converter stations for voltages above 600 kV: R and D needs and priorities: Final report  

Science Conference Proceedings (OSTI)

A study of the R and D needed to build converter stations for HVDC transmission lines with pole-to-ground voltages between 800 and 1200 kV confirmed that economical designs for more than 800 kV will require long-term R and D. Converter stations for 800 kV appear possible with existing technology.

Krishnayya, P.C.S.; Maruvada, P.S.; Lambeth, P.J.; Desilets, G.; Trinh, N.G.

1986-12-01T23:59:59.000Z

26

Standby rate design: current issues and possible innovations  

SciTech Connect

While options pricing principles have some relevance for the design a standby distribution rates, insurance pricing may provide an even better model. An insurance-based approach using an outage probability methodology also provides powerful incentives to the utility to connect additional DG resources to the grid. (author)

Goulding, A.J.; Bahceci, Serkan

2007-05-15T23:59:59.000Z

27

STABILIZED HIGH INTENSITY SOURCE OF 80 kv  

SciTech Connect

With the change of the current load from 0 to 2.5 mamp and simultaneous change of incoming intensity from 270 to 190 v, the stabilized high-intensity source changes less than l%.. The stabilized intensity can be arranged in steps of 5 kv from 60 to 80 kv. The high-intensity stabilizer automatically switches on upon reaching 60 kv. (tr-auth)

Polivanov, V.V.; Izyurov, A.V.; Pyatakov, N.I.

1959-09-01T23:59:59.000Z

28

SUSTAINABLE DESIGN THIRD-PARTY RATING OF HEALTHCARE FACILITIES  

E-Print Network (OSTI)

(GBCI) began requiring that all new construction and major renovation projects seeking LEED certification for inpatient, outpatient, or long-term care facilities must use the LEED for Healthcare rating system. 2. BACKGROUND: The VA Sustainable Design and Energy Reduction Manual (April 2010) requires major construction projects to achieve a third-party green building certification of at least LEED Silver or two Green Globes. VA commissioned a study to determine the impact of USGBC’s new requirement on VA’s construction program. The study compared LEED for Health Care (LEED HC) to LEED for New Construction (LEED NC) and determined that there will be little impact to cost or effort when using LEED HC in lieu of LEED NC. (1) Projects using the Green Building Initiative’s (GBI) Green Globes rating system will not be affected. 3. NEW STANDARD: All VA healthcare projects registering for LEED

unknown authors

2012-01-01T23:59:59.000Z

29

A 50 kV solid state multipulse kicker modulator  

DOE Green Energy (OSTI)

Performance requirements, design concepts, and test results for a prototype multipulse kicker modulator based on solid-state switches and a voltage-adding transformer topology are described. Tape-wound cores are stacked to form the transformer primary windings and a cylindrical pipe that passes through the circular inner diameters of the cores serves as the secondary winding of the step-up transformer. Boards containing MOSFET switches, trigger circuitry, and energy-storage capacitors plug into the core housings. A 50 kV prototype modulator that meets most of the facility requirements has been designed, fabricated, and tested at LLNL. More recent work has been concerned with designing and testing cores and boards with the full volt-second capability needed for 24-pulse operation. Results of the 50 kV prototype tests, preliminary tests of the full-volt-second cores and boards, and future development needs are described.

Walstrom, P. L. (Peter L.); Cook, E. G. (Edward G.)

2003-01-01T23:59:59.000Z

30

Plans for 735 kV substation. Towers revealed: Manicouagan-Outardes system  

SciTech Connect

A review of papers presented at the Toronto IEEE meeting is presented. Details of the substation design for the Manicouagan-Outardes 735 kV system are given.

Archambeau, J.; Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-07-15T23:59:59.000Z

31

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high voltage GaAs photoguns have been built at Jefferson Lab based on a compact inverted insulator design. One photogun provides the polarized electron beam at CEBAF and operates at 130 kV bias voltage. The other gun is used for high average current lifetime studies at a dedicated test facility and has been operated at bias voltage up to 225 kV. The advantages of higher DC voltage for CEBAF include reduced space-charge emittance growth and the potential for prolonged photocathode lifetime. However, a consequence of operating at higher voltages is the increased likelihood of field emission or breakdown, both of which are unacceptable. Highlights of the R&D studies leading toward a production 200keV GaAs photogun for CEBAF will be presented.

J.M. Grames, P.A. Adderley, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, R. Suleiman, K.E.L. Surles-Law

2011-03-01T23:59:59.000Z

32

Electrical and mechanical design criteria for EHV and UHV: overhead transmission lines  

Science Conference Proceedings (OSTI)

The results are presented of a program devoted to the selection of electrical and mechanical design criteria and parameters for overhead power transmission lines for ac systems rated at from 345 to 1100 kV and for dc systems rated at from 600 to 1200 kV. Information is included on the environmental effects, i.e., audible noise and electric fields, of the lines, mechanical and economic requirements, safety, failures, grounding, and lightning protection. (LCL)

Not Available

1980-06-01T23:59:59.000Z

33

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

34

Implications of carbon cap-and-trade for electricity rate design, with examples from Florida  

Science Conference Proceedings (OSTI)

The price of CO{sub 2} emissions allowances affects the structure of the utility's costs, which has implications for rate design and load management programs. Depending on the design of the program to recover these costs, utility total revenue requirements - and the rate design utilized to recover these requirements - may be impacted. A new way to think about rate design may be required. (author)

Parmesano, Hethie; Kury, Theodore J.

2010-10-15T23:59:59.000Z

35

Revised noise criteria for design and rating of HVAC systems  

Science Conference Proceedings (OSTI)

This paper reviews current methods of rating the noise produced by HVAC systems and explains why these ratings fail to be correlated with subjective opinion in many cases. An entirely new method of assigning noise ratings is proposed which is expected to provide a significantly better correlation between objective measurements and subjective response. The proposed new rating method makes use of a revised set of noise criterion curves (RC curves) which appeared for the first time in Chap. 35 of the 1980 Systems Volume of the ASHRAE Handbook. This paper also discusses the technical considerations leading to the development of the RC curves as a replacement for the NC curves which have been used in the past.

Warren E. Blazier Jr.

1984-01-01T23:59:59.000Z

36

Present and future applications for 34. 5-kV vacuum switchgear  

SciTech Connect

Vacuum technology applied to circuit breakers for 34.5-kV metal-clad switchgear offers significant advantages over equipment of previous design. Substation size, a major consideration to the 34.5-kV distribution system designer, is further reduced when vacuum equipment is specified. Vacuum equipment versatility is evidenced by the growing number of substation circuit configurations being implemented. Improved interruption capabilities, longer life and reduced maintenance are features offered by vacuum. These many features assure vacuum equipment a prominent position in future substation designs in this voltage class.

Sullivan, P.

1975-01-01T23:59:59.000Z

37

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

38

Synthetic aperture design for increased SAR image rate  

DOE Patents (OSTI)

High resolution SAR images of a target scene at near video rates can be produced by using overlapped, but nevertheless, full-size synthetic apertures. The SAR images, which respectively correspond to the apertures, can be analyzed in sequence to permit detection of movement in the target scene.

Bielek, Timothy P. (Albuquerque, NM); Thompson, Douglas G. (Albuqerque, NM); Walker, Bruce C. (Albuquerque, NM)

2009-03-03T23:59:59.000Z

39

Design considerations for high-data-rate chip interconnect systems  

Science Conference Proceedings (OSTI)

Over the past decade, data rates for electrical interconnects in interchip communications systems have experienced a dramatic increase from <1 Gb/s to 10 Gb/s and beyond to keep up with ever increasing demands for more I/O bandwidth from modern high-capacity ...

Troy Beukema

2010-10-01T23:59:59.000Z

40

Hydro Quebec's 735 kV system in operation by 1965  

SciTech Connect

The 735-kV transmission system adopted for the Manicouagan-Outardes development consists of three 735-kV lines, two of which will cross the St. Lawrence River at Quebec City and follow its south shore to Montreal. The third circuit will be entirely on the north shore of the St. Lawrence. Six 735-kV substations will be required: two collector substations at the sending end, two intermediate substations in the Quebec City area and two receiving substations in the Montreal area. Some of the problems associated with the planning and design of a transmission system intended to deliver approximately 5000 MW over a distance of 360 miles are discussed. The aspects of transmission and substation planning, transmission line features, substation design, control and communications design are considered.

Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

42

The Impact of Rate Design and Net Metering on the Bill Savings from  

E-Print Network (OSTI)

LBNL-3276E The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV Energy (Solar Energy Technologies Program) and the Office of Electricity Delivery and Energy Reliability of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers

43

MFTF 230 kV pulsed power substation  

SciTech Connect

The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design.

Wilson, J.H.

1979-11-12T23:59:59.000Z

44

765kV Transmission line Voltage gradient  

E-Print Network (OSTI)

Corona ring Transmission lines Nowadays, due to the ever increasing energy consumption and power supply optimization, it is required to construct new power plants, substations and transmission lines. In Iran, also, because of increasing demand for electrical energy, for a significant power loss reduction in power transmission over long distances, and to construct high transmission lines that lead to reduction in the economic costs of transmission lines, the transmission lines must be considered at extra high voltage (EHV) levels. These EHV levels should be compared with the low voltage levels in order to extract the benefits. Therefore, in this paper, a review has been conducted on the types of 765 kV transmission lines used in different countries and a comparison between them and the low voltage levels have been performed. Accordingly, the advantages of EHV transmission lines are summarized. Finally, designing a line of 765 kV single-circuit with 6 conductors per bundle based on existing standards is presented.

unknown authors

2012-01-01T23:59:59.000Z

45

The Impact of Rate Design and Net Metering on the Bill Savings from  

Open Energy Info (EERE)

Impact of Rate Design and Net Metering on the Bill Savings from Impact of Rate Design and Net Metering on the Bill Savings from Distributed Photovoltaics (PV) for Residential Customers in California Jump to: navigation, search Tool Summary LAUNCH TOOL Name: The Impact of Rate Design and Net Metering on the Bill Savings from Distributed Photovoltaics (PV) for Residential Customers in California Focus Area: Renewable Energy Topics: Best Practices Website: eetd.lbl.gov/ea/emp/reports/lbnl-3276e.pdf Equivalent URI: cleanenergysolutions.org/content/impact-rate-design-and-net-metering-b Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration & Implementation This report analyzes the bill savings from photovoltaic (PV) deployment for residential customers of California's two largest electric utilities -

46

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

Grames, J M; Clark, J; Hansknecht, J; Poelker, M; Stutzman, M L; Suleiman, R; Surles-Law, K.E.L.; BastaniNejad, M

2011-03-01T23:59:59.000Z

47

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning & Projects Planning & Projects Power Marketing Rates You are here: SN Home page > Power Marketing > RATES Rates and Repayment Services Rates Current Rates Power Revenue Requirement Worksheet (FY 2014) (Oct 2013 - Sep 2014) (PDF - 30K) PRR Notification Letter (Sep 27, 2013) (PDF - 959K) FY 2012 FP% True-Up Calculations(PDF - 387K) Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) PRR Forecast FY14-FY17 (May 23, 2013) (PDF - 100K) Forecasted Transmission Rates (May 2013) (PDF - 164K) Past Rates 2013 2012 2011 2010 2009 Historical CVP Transmission Rates (April 2013) (PDF - 287K) Rate Schedules Power - CV-F13 - CPP-2 Transmission - CV-T3 - CV-NWT5 - PACI-T3 - COTP-T3 - CV-TPT7 - CV-UUP1 Ancillary - CV-RFS4 - CV-SPR4 - CV-SUR4 - CV-EID4 - CV-GID1 Federal Register Notices - CVP, COTP and PACI

48

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

Marketing > RATES Marketing > RATES RATES Current Rates Past Rates 2006 2007 2008 2009 2010 2011 2012 Rates Schedules Power CV-F13 CPP-2 Transmissions CV-T3 CV-NWT5 PACI-T3 COTP-T3 CV-TPT7 CV-UUP1 Ancillary CV-RFS4 CV-SPR4 CV-SUR4 CV-EID4 CV-GID1 Future and Other Rates SNR Variable Resource Scheduling Charge FY12-FY16 (October 1, 2012) SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K)

49

Rates of reaction and process design data for the Hydrocarb Process  

DOE Green Energy (OSTI)

In support of studies for developing the coprocessing of fossil fuels with biomass by the Hydrocarb Process, experimental and process design data are reported. The experimental work includes the hydropryolysis of biomass and the thermal decomposition of methane in a tubular reactor. The rates of reaction and conversion were obtained at temperature and pressure conditions pertaining to a Hydrocarb Process design. A Process Simulation Computer Model was used to design the process and obtain complete energy and mass balances. Multiple feedstocks including biomass with natural gas and biomass with coal were evaluated. Additional feedstocks including green waste, sewage sludge and digester gas were also evaluated for a pilot plant unit.

Steinberg, M.; Kobayashi, Atsushi [Brookhaven National Lab., Upton, NY (United States); Tung, Yuanki [Hydrocarb Corp., New York, NY (United States)

1992-08-01T23:59:59.000Z

50

Energy Analysis Department Electricity Markets and Policy Group The Impact of Rate Design and Net  

E-Print Network (OSTI)

Energy Analysis Department Electricity Markets and Policy Group The Impact of Rate Design and Net of Energy #12;Energy Analysis Department Electricity Markets and Policy Group 2 Project Overview Context alternative compensation mechanisms #12;Energy Analysis Department Electricity Markets and Policy Group 3

51

Debate response: Which rate designs provide revenue stability and efficient price signals? Let the debate continue.  

SciTech Connect

Let's engage in further discussion that provides solutions and details, not just criticisms and assertions. Let's engage in a meaningful dialogue about the conditions where real-time pricing or critical peak pricing with decoupling or the SFV rate design with a feebate is most effective. (author)

Boonin, David Magnus

2009-11-15T23:59:59.000Z

52

RATES  

NLE Websites -- All DOE Office Websites (Extended Search)

RATES RATES Rates Document Library SNR Rates Process Calendar (PDF - 171K) Procedures Informal Process Transmission Action Items List (PDF - 144K) Power Action Item List updated on 4-27-10 (PDF - 155K) Power Action Item List (Quick links to relevant documents) Formal Process Rates Brochure (01/11/2011) (PDF - 900K) Appendix A - Federal Register Notice (01/03/2011) (PDF - 8000K) Appendix B - Central Valley Project Power Repayment Study (PDF - 22,322K) Appendix C - Development of the CVP Cost of Service Study (PDF - 2038K) Appendix D - Western Transmission System Facilities Map (PDF - 274K) Appendix E - Estimated FY12 FP and BR Customer (PDF - 1144K) Appendix F - Forecasted Replacements and Additions FY11 - FY16 (PDF - 491K) Appendix G - Definitions (PDF - 1758K) Appendix H - Acronyms (PDF - 720K)

53

Kuiper Belt Object Occultations: Expected Rates, False Positives, and Survey Design  

E-Print Network (OSTI)

A novel method of generating artificial scintillation noise is developed and used to evaluate occultation rates and false positive rates for surveys probing the Kuiper Belt with the method of serendipitous stellar occultations. A thorough examination of survey design shows that: (1) diffraction-dominated occultations are critically (Nyquist) sampled at a rate of 2 Fsu^{-1}, corresponding to 40 s^{-1} for objects at 40 AU, (2) occultation detection rates are maximized when targets are observed at solar opposition, (3) Main Belt Asteroids will produce occultations lightcurves identical to those of Kuiper Belt Objects if target stars are observed at solar elongations of: 116 deg 7-8 sigma should be adopted to ensure that viable candidate events can be disentangled from false positives.

Bickerton, Steven; Kavelaars, JJ

2009-01-01T23:59:59.000Z

54

KUIPER BELT OBJECT OCCULTATIONS: EXPECTED RATES, FALSE POSITIVES, AND SURVEY DESIGN  

Science Conference Proceedings (OSTI)

A novel method of generating artificial scintillation noise is developed and used to evaluate occultation rates and false positive rates for surveys probing the Kuiper Belt with the method of serendipitous stellar occultations. A thorough examination of survey design shows that (1) diffraction-dominated occultations are critically (Nyquist) sampled at a rate of 2 Fsu{sup -1}, corresponding to 40 s{sup -1} for objects at 40 AU, (2) occultation detection rates are maximized when targets are observed at solar opposition, (3) Main Belt asteroids will produce occultations light curves identical to those of Kuiper Belt Objects (KBOs) if target stars are observed at solar elongations of: 116{sup 0} {approx}7-8{sigma} should be adopted to ensure that viable candidate events can be disentangled from false positives.

Bickerton, S. J. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Welch, D. L. [Department of Physics and Astronomy, McMaster University, Hamilton, ON L8S 4M1 (Canada); Kavelaars, J. J. [Herzberg Institute of Astrophysics, Victoria, BC V9E 2E7 (Canada)], E-mail: bick@astro.princeton.edu, E-mail: welch@physics.mcmaster.ca, E-mail: JJ.Kavelaars@nrc-cnrc.gc.ca

2009-05-15T23:59:59.000Z

55

In-Vessel Coil Material Failure Rate Estimates for ITER Design Use  

SciTech Connect

The ITER international project design teams are working to produce an engineering design for construction of this large tokamak fusion experiment. One of the design issues is ensuring proper control of the fusion plasma. In-vessel magnet coils may be needed for plasma control, especially the control of edge localized modes (ELMs) and plasma vertical stabilization (VS). These coils will be lifetime components that reside inside the ITER vacuum vessel behind the blanket modules. As such, their reliability is an important design issue since access will be time consuming if any type of repair were necessary. The following chapters give the research results and estimates of failure rates for the coil conductor and jacket materials to be used for the in-vessel coils. Copper and CuCrZr conductors, and stainless steel and Inconel jackets are examined.

L. C. Cadwallader

2013-01-01T23:59:59.000Z

56

The Impact of Rate Design and Net Metering on the Bill Savings from  

NLE Websites -- All DOE Office Websites (Extended Search)

The Impact of Rate Design and Net Metering on the Bill Savings from The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California Title The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Darghouth, Naïm, Galen L. Barbose, and Ryan H. Wiser Pagination 62 Date Published 04/2010 Publisher LBNL City Berkeley Keywords electricity markets and policy group, electricity rate design, energy analysis and environmental impacts department, net metering, photovoltaics Abstract Net metering has become a widespread policy in the U.S. for supporting distributed photovoltaics (PV) adoption.1 Though specific design details vary, net metering allows customers with PV to reduce their electric bills by offsetting their consumption with PV generation, independent of the timing of the generation relative to consumption - in effect, compensating the PV generation at retail electricity rates (Rose et al. 2009). Though net metering has played an important role in jump-starting the PV market in the U.S., challenges to net metering policies have emerged in a number of states and contexts, and alternative compensation methods are under consideration. Moreover, one inherent feature of net metering is that the value of the utility bill savings it provides to customers with PV depends heavily on the structure of the underlying retail electricity rate, as well as on the characteristics of the customer and PV system. Consequently, the bill-savings value of net metering - and the impact of moving to alternative compensation mechanisms - can vary substantially from one customer to the next. For these reasons, it is important for policymakers and others that seek to support the development of distributed PV to understand both how the bill savings benefits of PV varies under net metering, and how the bill savings under net metering compares to savings associated with other possible compensation mechanisms. To advance this understanding, we analyze the bill savings from PV for residential customers of California's two largest electric utilities, Pacific Gas and Electric (PG&E) and Southern California Edison (SCE).3 The analysis is based on hourly load data from a sample of 215 residential customers located in the service territories of the two utilities, matched with simulated hourly PV production for the same time period based on data from the nearest of 73 weather stations in the state. We focus on these two utilities, both because we had ready access to a sample of load data for their residential customers, and because their service territories are the largest markets for residential PV in the country.

57

Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report  

Science Conference Proceedings (OSTI)

This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.

Not Available

1985-01-01T23:59:59.000Z

58

Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico  

SciTech Connect

Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.

1985-06-01T23:59:59.000Z

59

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

Borenstein, S. , 2007. Electricity Rate Structures and theEnvironmentally-Sound Electricity Rates for the Twenty-FirstCap-and-Trade for Electricity Rate Design, with Examples

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

60

1200-kV future seen; automated distribution dangers  

SciTech Connect

A major problem facing the electric-utility industry concerns power-transmission corridors. The corridors serving the nation's power needs may not be available in sufficient numbers to meet growing electricity demand. The difficulty in locating new power corridors will necessitate the transmission of increased power along pathways already available. The possibility of open-transmission systems going to 1200 kV is being researched at Westinghouse Electric Corporation. While much of the technology for 1200-kV transmission is being demonstrated currently (such as transformers, puffer-breakers, lightning arrestors, and reactors), the public fear of low-level radiation and excessive noise may make construction of 1200-kV open substations near the load virtually impossible. The implications of not having sufficient load capability to meet demand concern Westinghouse officials. The possibility of involuntary power rationing could require social and political solutions instead of technical ones. (SAC)

1980-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

62

Scale model simulates full-size substation electric fields. [For 345-kV system  

SciTech Connect

An innovative scale model of a 345-kV substation that can be energized to produce representative electric fields has been developed. The purpose of the model is to determine how changes in substation design and operation affect ground-level voltage gradients. Recent tests of the field strengths predicted by the model and actual voltage gradients at the full-size substation at 150 different pairs of points showed excellent agreement. For 94 percent of the pairs the model error was less than 10 percent. The statistical mean of the absolute values of the discrepancies for all 150 points was only 4.6 percent.

1977-04-01T23:59:59.000Z

63

Design philosophy for high-resolution rate and throughput spectroscopy systems  

SciTech Connect

The paper describes the philosophy behind the design of a pulse processing system used in a semiconductor detector x-ray spectrometer to be used for plasma diagnostics at the Princeton TFTR facility. This application presents the unusual problems of very high counting rates and a high-energy neutron background while still requiring excellent resolution. To meet these requirements three specific new advances are included in the design: (i) A symmetrical triangular pulse shape is employed in the main pulse-processing channel. A new simple method of generating a close approximation to the symmetrical triangle has been developed. (ii) To cope with the very wide dynamic range of signals while maintaining a constant fast resolving time, approximately symmetical triangular pulse shaping is also used in the fast pulse pile-up inspection channel. (iii) The demand for high throughput has resulted in a re-examination of the operation of pile-up rejectors and pulse stretchers. As a result a technique has been developed that, for a given total pulse shaping time, permits approximately a 40% increase in throughput in the system. Performance results obtained using the new techniques are presented.

Goulding, F.S.; Landis, D.A.; Madden, N.W.

1982-05-01T23:59:59.000Z

64

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

Practices in State Net Metering Policies and InterconnectionThe Economic Cost of Net Metering in Maryland: Who Bears theof Rate Design and Net Metering on the Bill Savings from

Darghouth, Naim R.

2012-01-01T23:59:59.000Z

65

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

Pricing Beneficial to Solar PV in New York City? PreparedSubstantial Benefit of Solar PV. ” The Electricity Journal,36: MRW & Associates. 2007. Solar PV and Retail Rate Design.

Darghouth, Naim

2010-01-01T23:59:59.000Z

66

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

Practices in State Net Metering Policies and InterconnectionThe Economic Cost of Net Metering in Maryland: Who Bears theImpact of Rate Design and Net Metering on the Bill Savings

Darghouth, Naim R.

2012-01-01T23:59:59.000Z

67

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

68

EIS-0450: TransWest Express 600 kV Direct Current Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in...

69

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating...

70

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at medium voltages * 13.8 kV and 4.16 kV are commonly used voltages * Silicon Carbide high voltage devices play a pivotal role at these voltages 6 Multilevel vs Two-Level...

71

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

72

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

73

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

74

Design and analysis of a high-rate acoustic link for underwater video transmission  

E-Print Network (OSTI)

A high bit rate acoustic link for underwater video transmission is examined. Currently, encoding standards support video transmission at bit rates as low as 64 kbps. While this rate is still above the limit of commercially ...

Pelekanakis, Konstantinos

2004-01-01T23:59:59.000Z

75

Best Practices for HPFF Pipe Type Cable Assessment, Maintenance and Testing: Blenheim-Gilboa 345-kV Cable Systems  

Science Conference Proceedings (OSTI)

EPRI and the New York Power Authority (NYPA) have sponsored an extensive series of tests on the NYPA Blenheim-Gilboa 345-kV high-pressure fluid-filled (HPFF) transmission cable systems to determine their condition. Several tests were also designed to determine cable power transfer capability based on distributed temperature measurements and to improve the best maintenance practices for the Blenheim-Gilboa HPFF cable systems.

2005-03-01T23:59:59.000Z

76

Retrofit of an existing 160 MVA 69KV major Chicago downtown substation to 200 MVA 138KV while maintaining continuity of service  

SciTech Connect

In 1957 Transmission Substation 68, LaSalle, (TSS 68) was placed in service. This paper reports that the station consists of four 40 MVA 69 kV/12 kV transformers which feed two 12 kV ring buses. The 12 kV switchgear is housed on the first and second floors of a 62 year old structurally sound building. Located on the south and west sides of this building are the four transformers. The entire station is located on a parcel of land approximately 14,000 square feet.

Czernenko, G.P. (Commonwealth Edison Co., Chicago, IL (United States))

1992-01-01T23:59:59.000Z

77

WindPACT Turbine Rotor Design, Specific Rating Study; Period of Performance: June 29, 2000--March 1, 2003  

DOE Green Energy (OSTI)

In 2000, the National Renewable Energy Laboratory (NREL) launched the Wind Partnerships for Advanced Component Technologies (WindPACT) program to examine ways in which the cost of wind energy could be reduced a further 30%. One element of the WindPACT program has been a series of design studies aimed at each of the major subsystems of the wind turbine to study the effect of scale and of alternative design approaches. The WindPACT Turbine Rotor Design Study was carried out by Global Energy Concepts, LLC, (GEC) on behalf of NREL, and the final report was delivered in June 2002. The study examined what configuration and design changes in the rotor would reduce the overall cost of energy. The objectives of this report are to use the 1.5-MW baseline configuration from the earlier WindPACT Rotor Design Study to examine the effect of different power ratings and to identify an optimum specific rating; to examine the effect of different maximum tip speeds on overall cost of energy (COE); to examine the role of different wind regimes on the optimum specific rating; and to examine how the optimum specific rating may be affected by introducing more advanced blade designs.

Malcolm, D. J.; Hansen, A. C.

2003-11-01T23:59:59.000Z

78

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

of Carbon Cap-and-Trade for Electricity Rate Design, withmeet cap-and- trade regulations in the electricity sector:

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

79

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

80

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

82

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

83

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

84

Geomagnetically Induced Current Estimation in the Wisconsin 345-kV Power Grid  

Science Conference Proceedings (OSTI)

This technical update presents the results from a project to assess space weather effects on the Wisconsin 345-kV power transmission grid.

2008-08-21T23:59:59.000Z

85

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

86

Rate impacts and key design elements of gas and electric utility decoupling: a comprehensive review  

Science Conference Proceedings (OSTI)

Opponents of decoupling worry that customers will experience frequent and significant rate increases as a result of its adoption, but a review of 28 natural gas and 17 electric utilities suggests that decoupling adjustments are both refunds to customers as well as charges and tend to be small. (author)

Lesh, Pamela G.

2009-10-15T23:59:59.000Z

87

Rate Schedules  

Energy.gov (U.S. Department of Energy (DOE))

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

88

Evaluation of Some Ground Truth Designs for Satellite Estimates of Rain Rate  

Science Conference Proceedings (OSTI)

In this paper point gauge measurements are analyzed as part of a ground truth design to validate satellite retrieval algorithms at the field-of-view spatial level (typically about 20 km). Even in the ideal case the ground and satellite ...

Eunho Ha; Gerald R. North; Chulsang Yoo; Kyung-Ja Ha

2002-01-01T23:59:59.000Z

89

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

Science Conference Proceedings (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

90

Proposed 230-kV Crossover Substation, Big Horn County, Montana: Environmental assessment  

SciTech Connect

Western proposes to construct, operate, and maintain a 230-kV substation northwest of Hardin, Big Horn County, Montana. The proposed Crossover Substation would form an interconnection between Western's Yellowtail-Custer and MPC's Colstrip-Billings 230-kV transmission lines. Impacts and mitigation strategies are discussed.

1984-02-01T23:59:59.000Z

91

Field Demonstration of a 24-kV Warm Dielectric Superconducting Cable at Detroit Edison: FY2003 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV HTS power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The FY2002 status report focused on leak detection. The cornerstone of...

2004-03-30T23:59:59.000Z

92

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

93

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

94

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

95

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

96

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

DOE Green Energy (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

97

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

98

Development of 1200-kV compressed-gas-insulated transmission and substation equipment in the United States  

SciTech Connect

Major research and development (R and D) programs for the development of sulfur hexafluoride (SF/sub 6/) compressed-gas-insulated (CGI) equipment for ultrahighvoltage (uhv) application at 100-1200 kV have been under way independently in both the United States and Japan. The CGI transmission and substation equipment under study and development in these countries has included the surge arrester, circuit breaker, CGI transmission bus, disconnect and ground switches, and an air-SF/sub 6/ termination. The US CGI program has also included development of a power transformer, shunt reactor, voltage- and current-sensing instrumentation, and a line trap, all for 1200-kV application. This paper presents the overall status of development of CGI substation equipment for uhv application in the United States. It describes the major CGI components developed, highlights their key design aspects, indicates the present status of development and testing, and addresses the work remaining to establish final design consepts. The paper also includes 23 references, a number of which have not been widely distributed or included in any of the recently published bibliographies of uhv substation equipment.

Walldorf, S.P.; Gnadt, P.A.

1986-01-01T23:59:59.000Z

99

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

Science Conference Proceedings (OSTI)

Net metering has become a widespread mechanism in the U.S. for supporting customer adoption of distributed photovoltaics (PV), but has faced challenges as PV installations grow to a larger share of generation in a number of states. This paper examines the value of the bill savings that customers receive under net metering, and the associated role of retail rate design, based on a sample of approximately two hundred residential customers of California's two largest electric utilities. We find that the bill savings per kWh of PV electricity generated varies by more than a factor of four across the customers in the sample, which is largely attributable to the inclining block structure of the utilities' residential retail rates. We also compare the bill savings under net metering to that received under three potential alternative compensation mechanisms, based on California's Market Price Referent (MPR). We find that net metering provides significantly greater bill savings than a full MPR-based feed-in tariff, but only modestly greater savings than alternative mechanisms under which hourly or monthly net excess generation is compensated at the MPR rate.

Energy and Resources Group, University of California, Berkeley; Darghouth, Naim R.; Barbose, Galen; Wiser, Ryan

2011-06-01T23:59:59.000Z

100

Evaluation of 765-kV Polymer Insulators in a Contaminated Environment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) and the Korea Electric Power Research Institute (KEPRI) are conducting a joint study on the aging performance of 765-kV polymer insulators in a contaminated marine environment. The main component of this research is a long-term (two-year) natural aging test that will be conducted by KEPRI at their 765-kV Gochang test facility in South Korea. EPRI has engaged three other utilities that operate 765-kV transmission systemsEskom in South Africa, American Electric ...

2010-04-30T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Detailed design, fabrication and testing of an engineering prototype compensated pulsed alternator. Final report  

DOE Green Energy (OSTI)

The design, fabrication, and test results of a prototype compensated pulsed alternator are discussed. The prototype compulsator is a vertical shaft single phase alternator with a rotating armature and salient pole stator. The machine is designed for low rep rate pulsed duty and is sized to drive a modified 10 cm Beta amplifier. The load consists of sixteen 15 mm x 20 mm x 112 cm long xenon flashlamps connected in parallel. The prototype compulsator generates an open circuit voltage of 6 kV, 180 Hz, at a maximum design speed of 5400 rpm. At maximum speed, the inertial energy stored in the compulsator rotor is 3.4 megajoules.

Bird, W.L. Jr.; Woodson, H.H.

1980-03-01T23:59:59.000Z

102

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

Electricity Rates..generation at retail electricity rates (Rose et al. 2009).of the underlying retail electricity rate, as well as on the

Darghouth, Naim

2010-01-01T23:59:59.000Z

103

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

Residential Electricity Rates..2.1.1. Current Residential Electricity Rates PG&E and SCESCE, current residential electricity rates have inclining

Darghouth, Naim

2010-01-01T23:59:59.000Z

104

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

use (TOU) rate. 15 The utilities’ flat rates are “incliningin Tier 5. Both utilities’ flat rates also specify a minimumprices of both utilities’ TOU rates are summarized in Figure

Darghouth, Naim

2010-01-01T23:59:59.000Z

105

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

106

The Impact of Rate Design and Net Metering on the Bill Savings from Distributed PV for Residential Customers in California  

E-Print Network (OSTI)

details on the residential electricity rates offered by PG&Eis based on the residential retail electricity rates and net

Darghouth, Naim R.

2012-01-01T23:59:59.000Z

107

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

108

Design and demonstration of heat pipe cooling for NASP and evaluation of heating methods at high heating rates  

SciTech Connect

An evaluation of two heating methods for demonstration of NASP leading edge heat pipe technology was conducted. The heating methods were and rf induction heated plasma jet and direct rf induction. Tests were conducted to determine coupling from the argon plasma jet on a surface physically similar to a heat pipe. A molybdenum tipped calorimeter was fabricated and installed in an rf induction heated plasma jet for the test. The calorimetric measurements indicated a maximum power coupling of approximately 500 W/cm{sup 2} with the rf plasma jet. The effect of change in gas composition on the heating rate was investigated using helium. An alternative to the plasma heating of a heat pipe tip, an rf concentrator was evaluated for coupling to the hemispherical tip of a heat pipe. A refractory metal heat pipe was designed, fabricated, and tested for the evaluation. The heat pipe was designed for operation at 1400 to 1900 K with power input to 1000 W/cm{sup 2} over a hemispherical nose tip. Power input of 800 W/cm{sup 2} was demonstrated using the rf concentrator. 2 refs., 13 figs.

Merrigan, M.A.; Sena, J.T.

1989-01-01T23:59:59.000Z

109

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

and the Economics of Solar PV: Could Mandatory Time-of-Usea Substantial Benefit of Solar PV. The Electricity JournalMRW and Associates, 2007. Solar PV and Retail Rate Design (

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

110

Performance characteristics of the Atlas 60 kV, 60 kJ plastic capacitors  

DOE Green Energy (OSTI)

This paper provides the performance data of Atlas plastic capacitors as supplied by Maxwell Technologies and Aerovox Corporation. The fiberglass cases at 13 inches high by 29 inches wide and 28 inches in depth with a 2 inch by 18 inch bushing on each end. Two styles of the 33.5uF capacitors have been evaluated for Atlas use, a conventional paper-foil and a self-healing metalized-paper and plastic dielectric design. A test program to capacitor failure, is being used to evaluate capacitor lifetime at full voltage (60 kV) and a nominal 15% reversal. With the Atlas parameters, peak currents of {approximately} 340 kA are realized. In anticipation of faults, capacitors are capable, specified, and tested for 700 kA performance. Accurate methods are also utilized to determine capacitor inductance, less than 20 nH. The results of the various capacitor testing programs will be presented in addition to future directives for their R and D efforts.

Reass, W.; Bennet, G.; Bowman, D.; Lopez, E.; Monroe, M.; Parsons, W.

1997-12-01T23:59:59.000Z

111

Western Area Power Administration, Desert Southwest Region Facilities Ratings Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Ratings Project Facilities Ratings Project Hoover-Mead #1 and #5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead # 1 230-kV Transmission Line Along the Hoover-Mead #1 230-kV transmission line, the existing line will be reconductored between structures 0/4 and 4/2, about 3.5 linear miles. Structure 0/4 is located northeast of Mead Substation; structure 4/2 is located southeast of Boulder City Tap. The scope of work for the reconductoring includes the following: * At tangent structures (where there is no change in the angle of the transmission line), pulleys or travelers will be installed where the existing conductor attaches to the insulator. The old conductor will be pulled out through the travelers and new wire will be pulled in. A bucket truck

112

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waukesha Electric's activities Waukesha Electric's activities Energy Delivery Technologies Div 2010 David Szucs approx. July 2010 - January 2015 Waukeshaa, WI "Recovery Act - Fault Current Limiting Superconducting Transformer" Design and fabricate a prototype superconducting fault current limiting transformer (rated 28 MVA, 66kV/12kV service),whose operation will be demonstrated in a Southern California Edison switchyard. 07 02 2010 David Szucs Digitally signed by David Szucs DN: cn=David Szucs, o=NETL, ou=EDTD, email=szucs@netl.doe.gov, c=US Date: 2010.07.02 12:46:32 -04'00' 07 13 2010 Fred E. Pozzuto Digitally signed by Fred E. Pozzuto DN: cn=Fred E. Pozzuto, o=USDOE, ou=NETL-Office of Project Facilitation and Compliance, email=fred.pozzuto@netl.doe.gov, c=US Reason: I am approving this document

113

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

114

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage  

SciTech Connect

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

2011-08-25T23:59:59.000Z

115

Eight percent cost penalty for world's first 765-kV SF/sub 6/ substation may be bargain  

SciTech Connect

A Lynchburg, Virginia 765 kV sulfur hexafluoride substation cost a premium of 8% over conventional substations in order to meet environmental requirements, but the first 18 months of operation required no maintenance costs and a design flexibility that meant less land and no landscaping was required. Some of the added front-end cost should be assigned to research and development for this prototype installation. A review of the siting and design specifications cites a number of environmental as well as economic advantages of low-profile, gas-insulated substations. 7 figures, 1 table. (DCK)

Laskowski, L.M.

1981-08-01T23:59:59.000Z

116

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

117

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

118

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

119

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Resources, and the United States Environmental Protection AgencyDesigning Rate Structures that Support Your Objectives: Guidelines for NC Water Systems  

E-Print Network (OSTI)

The purpose for these rate setting guidelines is to provide water and wastewater utility managers and technical assistance providers with a framework in setting water and wastewater rates and rate structures that would meet the state’s and the utility’s policies and objectives. These guidelines provide step by step instructions and necessary information to allow the utility manager to make an informed policy-driven choice on the rate structure design. These guidelines do not provide instruction on how to project revenues and costs and how to calculate rates (dollar amounts) to balance a budget, but references other documents that provide such guidelines. These rate setting guidelines were developed by the Environmental Finance Center at the

unknown authors

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

TVA's 500-kV electric and magnetic fields: measurements and analyses  

Science Conference Proceedings (OSTI)

This report summarizes the results of the 500-kV electric and magnetic fields data project, performed by the Electrical Systems Group of the Tennessee Valley Authority (TVA). The objectives of the project were to measure, record, and analyze electric and magnetic fields in the vicintiy of TVA's 500-kV transmission lines. Also the effects of transmission line fields on the growth and development of selected agricultural and forest plant species were to be investigated. This report contains only the categorization and the statistical analysis of the fields data.

Not Available

1983-09-01T23:59:59.000Z

122

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

123

The 4 times 6 network; Upgrade of a major 500kV substation  

SciTech Connect

This paper describes a study to enhance the reliability of BC Hydro's Ingledow 500 kV substation. It employs truth tables and frequency and duration analysis. The study included double-breaker double-bus and 4 {times} 6 arrangements, and 4 {times} 6 was recommended for its cost and reliability advantages.

Page, R.; Nishikawara, K.; Stromotich, F. (Substation Planning Associates, Inc., West Vancouver (CA))

1991-04-01T23:59:59.000Z

124

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

125

BLID sensor evaluation at a 500-kV substation: an interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of a buried-line intrusion detection (BLID) sensor is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensor are described.

1979-05-01T23:59:59.000Z

126

Perimeter sensor evaluation at a 500-kV substation. Interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of exterior perimeter intrusion sensors is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensors are described.

Griffith, R.D.

1978-08-01T23:59:59.000Z

127

Design and testing of high power, repetitively pulsed solid-state closing switches  

DOE Green Energy (OSTI)

Repetitively pulsed closing switches are often required in high-power physics experiments. Traditionally, ignitrons have been used for these applications. There are reasons why ignitrons have undesirable features, such as the high trigger current which causes electromagnetic interference, the arc instability and environmental concern with the mercury used in the switches. With the development of ever increasing power rating of solid-state switches, in particular thyristors, the designer has the tools to replace ignitrons with solid-state devices. Using as an example a recently designed and tested 10 kV, 80 kA high-power switch, the design philosophy for repetitively pulsed switches is developed. The parameters which impose the greatest challenge on the device, such as di/dt, temperature rise and reverse blocking voltage are investigated with respect to their capability when operating in the pulsed mode. Starting with the available device data sheet information and published results of the dependency of the number of life cycles as a function of the device temperature, it is shown how the overload capability of a device for short term pulsed applications can be exploited. The detailed design of a 2 Hz, 10{sup 8} cycle, 12.5 kV, 80 kA, 3 ms switch, with a short circuit capability of 250 kA, is presented. The paper concludes with a short summary about device limits in voltage, current amplitude and pulse length ratings for repetitively pulsed switches using available thyristors.

Boenig, H.J. [Los Alamos National Lab., NM (United States); Schwartzenberg, J.W.; Willinger, L.J.; Piccone, D.E. [Silicon Power Corp., Malvern, PA (United States); Lopez, D.A.; Smolleck, H.A. [New Mexico State Univ., Las Cruces, NM (United States). Dept. of Electrical and Computer Engineering

1997-04-01T23:59:59.000Z

128

Design  

NLE Websites -- All DOE Office Websites (Extended Search)

Design Design of a Multithreaded Barnes-Hut Algorithm for Multicore Clusters Technical Report Junchao Zhang and Babak Behzad Department of Computer Science, University of Illinois at Urbana-Champaign {jczhang, bbehza2}@illinois.edu Marc Snir Department of Computer Science, University of Illinois at Urbana-Champaign and MCS Division, Argonne National Laboratory snir@anl.gov Abstract We describe in this paper an implementation of the Barnes-Hut al- gorithm on multicore clusters. Based on a partitioned global ad- dress space (PGAS) library, the design integrates intranode mul- tithreading and internode one-sided communication, exemplifying a PGAS + X programming style. Within a node, the computation is decomposed into tasks (subtasks), and multitasking is used to hide network latency. We study the tradeoffs between locality in private caches and locality in shared caches

129

Field Demonstration of a 24-kV Warm Dielectric Cable at Detroit Edison: FY2002 Annual Progress Report for the Detroit Edison HTS Cab le Field Demonstration Project  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high temperature superconductor (HTS) power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The successful implementation of thi...

2003-02-26T23:59:59.000Z

130

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

131

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

132

15KV Class 25KVA Single-Phase IUT Prototype Development, Testing, and Performance Verification  

Science Conference Proceedings (OSTI)

EPRI is leading the development and demonstration of fully integrated, production-grade 4-kV and 15-kV-class solid-state transformers for integrating energy storage technologies and electric vehicle (EV) fast charging. The development team includes utilities, power electronics experts, and a transformer manufacturer to provide guidance on taking the technologies from concept to production. The intelligent universal transformer (IUT) technology has been validated through development and lab testing, ...

2013-12-12T23:59:59.000Z

133

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

134

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

135

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

136

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

137

Electric Utility Rate Design Study: embedded generation costs on a time-of-day basis for Iowa Southern Utilities Company  

SciTech Connect

This report develops a method for determining average embedded generation costs on a time-of-day basis and describes the application of the method to Iowa Southern Utilities. These costs are not allocated to customer classes. Since average embedded costs are composed of the running (or variable) costs and the capital costs, the analysis examines each of these separately. Running costs on a time-of-day basis are determined through the use of a generation dispatch model that reports the loadings by generating unit and the running costs of meeting the load. These costs are reported on an hour-by-hour basis. The dispatch model takes into account the operating characteristics of each unit and the major engineering constraints on a system; e.g., must-run units, minimum up and down time, startup cost. After reviewing several suggested capital-cost allocation procedures, a method is developed that allocates capital costs on a time-of-day basis by using a recontracting-for-capacity procedure that allows capacity to vary by hour for each month. The method results in allocations to customers who benefit from its use. An important and distinguishing feature of this method is that it allows calculation of the costs before rating periods are chosen.

1980-01-01T23:59:59.000Z

138

Development of 77 kV 40 MVA gas-vapor cooled transformer  

SciTech Connect

A 77 KV 40 MVA gas-vapor cooled transformer has been developed as a prototype of substation transformers, which is directed to nonflammable and lightweight properties. To examine the operating reliability of the transformer, the reliability test has continued since July, 1981 at the Hokusetsu substation of KEPCO (Kansai Electric Power Co., Inc.). This report will cover the development work on thermal stability of materials, electrical fault test, insulation characteristics, cooling of model transformer, flow-induced static electrifiction, protection system and the prototype unit which is being built based upon these developments.

Tokoro, K.; Harumoto, Y.; Ina, T.; Kabayama, Y.; Sato, T.; Yamauchi, A.

1982-11-01T23:59:59.000Z

139

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

140

Data Center Rating Infrastructure Rating Development  

NLE Websites -- All DOE Office Websites (Extended Search)

in Portfolio Manager on June 7, 2010. The questions below are designed to help data center owners and operators better understand the rating and benchmark their buildings in...

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Draft environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (ac) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. These adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

142

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Final environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (AC) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. The adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

143

Single-transformer substation for 500 kV and over  

SciTech Connect

At extra high voltage substations which must meet high reliability requirements, in particular, two autotransformer groups are often installed almost simultaneously independent of the load. As a result, significant capital investment is frozen for long periods, and scarce electrical equipment is utilized inefficiently. Thus, in a number of cases the construction of substations with a single group of single-phase autotransformers is desirable. In this case, on failure of one autotransformer phase the time of subnormal energy output due to disconnection of the substation may reach several hours. The efficiency of extra high voltage substations may be improved significantly by using a proposed circuit for connection of a group of single-phase transformers with a single reserve phase, permitting installation of one group of single-phase transformers at a substation without impairment of reliability. The installation, performance and cost of this transformer arrangement are discussed. It is concluded that the use of single-transformer 500 kV substations with the proposed circuit as distribution substations would, on the one hand, provide sufficient reliability for users and, on the other hand, would make them competitive with 220 to 330 kV substations. In this case the network reliability can be provided by sectionalizing the lines at the site of transformer connection. This circuit can be used with two-sided substation supply. (LCL)

Gryuntal, Yu.L.; Mikhailov, A.K.; Slavin, G.A.

1978-06-01T23:59:59.000Z

144

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

2.2.1.1 Current Residential Electricity Rates PG&E and SCEhave total residential electricity rates that are similar toElectricity Rates .. 164 Residential

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

145

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

of Commercial Electric Utility Rate Structure Elements on1961. Principles of public utility rates, 2nd ed. ColumbiaPrinciples of Public Utility Rates, he cites the following

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

146

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

147

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

148

Proposal to negotiate, without competitive tendering, a contract for the maintenance of three 420 kV circuit breakers  

E-Print Network (OSTI)

This document concerns the award of a contract for the maintenance, by the manufacturer, of three 420 kV circuit breakers. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with SCHNEIDER ITALY (IT) (formerly NUOVA MAGRINI GALILEO), the manufacturer of the equipment, for the maintenance of three 420 kV circuit breakers for a total amount of 490 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT?100%.

2000-01-01T23:59:59.000Z

149

THE MECHANICAL DESIGN AND FABRICATION OF A CONVECTIVELY COOLED ION ACCELERATOR FOR CONTINUOUSLY OPERATING NEUTRAL BEAM SYSTEMS  

E-Print Network (OSTI)

100 kV 1. 5 sec Table 1. Grid heat loads as %beam power. Towith a central separation. Grid heat loading is the dominantsystem. To investigate grid heat loads on our grid designs

Paterson, J.A.

2012-01-01T23:59:59.000Z

150

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

151

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

152

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

153

Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation  

SciTech Connect

Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

Elahi, H.; Sublich, M. (GE Industry and Utility Sales, Schenectady, NY (US)); Anderson, M.E.; Nelson, B.D. (Wisconsin Power and Light Co., Madison, WI (USA))

1990-01-01T23:59:59.000Z

154

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

default electricity rate in the United States, especiallystates, including Washington, Louisiana, or Arkansas, have total residential electricity ratesStates are often compensated at the customer’s underlying retail electricity rate

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

155

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

compensation options. All rates increase slightly due to thesimilarly. The flat rate increases by $0.011/kWh (or 5.6%)peak and low period rates increase by 6%-12%. Since roughly

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

156

Comparison of prediction and measurement of negative sequence currents of generators connected to 345-kV asymmetrical transmission lines  

Science Conference Proceedings (OSTI)

This paper is used to evaluate the negative sequence currents (NSC) of two generators in a generation plant, which are connected to the power pool through four over-head asymmetrical 345-kV transmission lines. The simulation results by using PSS/E and ... Keywords: EMTP, PSS/E, asymmetrical transmission lines, negative sequence current, unbalance

Chi-Jui Wu; Ping-Heng Ho

2011-03-01T23:59:59.000Z

157

Environmental assessment: Coolidge-Saguaro 115-kV rehabilitation, Pinal County, Arizona  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) presents an analysis of the environmental impacts of the proposed rehabilitation of 29.6 miles of the Coolidge-Saguaro 115-kV transmission line. The project area is in Pinal County, Arizona. The proposal involves reconductoring the line with larger conductor, replacement of deteriorated structures, and replacement of damaged insulators. The proposed action is being considered in order to increase the safety and reliability of this line. The alternative of no action is also addressed in this EA. The proposed action would have insignificant impacts on wildlife, vegetation or other natural resources. There would be no impacts on floodplains or wetlands. The major impact would be on agricultural crops but much of this can be minimized by the timing of construction. There are no conflicts with county or local planning projects. No cultural resources will be affected by the proposed action. The no action alternative would not correct the potential safety hazard or reliability problems of the existing line.

Not Available

1982-09-01T23:59:59.000Z

158

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

159

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

160

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

162

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

163

Investigation of Geomagnetically Induced Currents in the Proposed Winnipeg-Duluth-Twin Cities 500-kV Transmission Line  

Science Conference Proceedings (OSTI)

The effects of geomagnetically induced currents (GIC) on a new 749-km, 500-kV ac transmission line were investigated. GIC effects on the operation of the line, equipment connected directly to the line, and power systems connected to the line were considered. The study concluded that GIC can have a substantial impact on equipment performance and on the power system. Potentially troublesome equipment and system conditions (both steady-state and transient) were identified.

1981-07-01T23:59:59.000Z

164

Field Demonstration of a 24-KV Warm Dielectric Cable at Detroit Edison: FY2001 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the U.S. Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high-temperature superconducting (HTS) power cable in a Detroit Edison substation to serve customer load. The scope of this demonstration will result in the world's first underground installation of an HTS cable system using an existing duct network. Furthermore, the project involves installing the necess...

2002-02-12T23:59:59.000Z

165

Klystron Modulator Design for the Los Alamos Neutron Science Center Accelerator  

SciTech Connect

This paper will describe the design of the 44 modulator systems that will be installed to upgrade the Los Alamos Neutron Science Center (LANSCE) accelerator RF system. The klystrons can operate up to 86 kV with a nominal 32 Amp beam current with a 120 Hz repetition rate and 15% duty cycle. The klystrons are a mod-anode design. The modulator is designed with analog feedback control to ensure the klystron beam current is flat-top regulated. To achieve fast switching while maintaining linear feedback control, a grid-clamp, totem-pole modulator configuration is used with an 'on' deck and an 'off' deck. The on and off deck modulators are of identical design and utilize a cascode connected planar triode, cathode driven with a high speed MOSFET. The derived feedback is connected to the planar triode grid to enable the flat-top control. Although modern design approaches suggest solid state designs may be considered, the planar triode (Eimac Y-847B) is very cost effective, is easy to integrate with the existing hardware, and provides a simplified linear feedback control mechanism. The design is very compact and fault tolerant. This paper will review the complete electrical design, operational performance, and system characterization as applied to the LANSCE installation.

Reass, William A. [Los Alamos National Laboratory; Baca, David M. [Los Alamos National Laboratory; Partridge, Edward R. [retired; Rees, Daniel E. [Los Alamos National Laboratory

2012-06-22T23:59:59.000Z

166

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

167

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

168

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

169

High-Pressure Fluid-Filled Cable Condition Assessment Through Electrical Impulse Testing of PSE&G 230-kV Service-Aged Cable  

Science Conference Proceedings (OSTI)

This report describes electrical and mechanical testing of a service-aged 230-kV high-pressure fluid-filled (HPFF) cable sample that was removed from a Public Service Electric & Gas (PSE&G) underground transmission line.

2008-11-26T23:59:59.000Z

170

STUDY OF ACCELERATED AGING OF 15 kV XLPE AND EPR CABLE INSULATION BY SWITCHING IMPULSES AND ELEVATED AC VOLTAGE.  

E-Print Network (OSTI)

?? Accelerated aging of 15 kV Cross-linked Polyethylene (XLPE) and Ethylene Propylene Rubber (EPR) power cables was carried out in the experiments set for the… (more)

Cao, Linfeng

2010-01-01T23:59:59.000Z

171

A DESIGN STUDY OF A LOW POWER AQUEOUS HOMOGENEOUS BOILING REACTOR POWER PLANT  

SciTech Connect

This design study describes a reactor and associated power plant that has been designed to produce 100 kv of net electric power and 400 kv of hot water space heating at a total thermal output of 1300 kw. The fuel consists of a solution of UO/sub 2/SO/sub 4/ in light water. Power is removed from the core by boiling the fuel solution and transferring the heat to the secondary steam system by condensing primary water on the external surface of a bayonet type boiler and boiling secondary water within the tubes. Saturated steam, produced in the boiler at 225 psia (Full Power) is used to drive a turbo generator, Extraction steam from the turbine is used, at a reduced pressure, for space heating. The initial loading of the reactor is approximately 4.8 kg of U/sub 235/ and operation based on an average load factor of 80% will require fuel addition at the rate of about 580 grams per year. It may be desirable to replace the fuel in the core after a period of 5 years operation due to the accumulation of corrosion products. The reactor control is affected automatically by power demand. The major objective has been to design a reactor that is reliable and simple, requiring little if any operating personnel and routine maintenance only which can be performed by one man. The design should stress simplicity of the system, ease of erection at the site, initial transportability, reliability and ease of operation; these characteristics are then expected to result in greatly reduced effort and manpower support over a conventional system. (auth)

Mong, B.A.; Colgan, J.E.; D' Elia, R.A.; Mooradian, J.S.; Rhode, G.K.; Wood, P.M.

1955-06-01T23:59:59.000Z

172

Uncertainties in the Value of Bill Savings from Behind-the-Meter, Residential Photovoltaic Systems: The Roles of Electricity Market Conditions, Retail Rate Design, and Net Metering  

E-Print Network (OSTI)

Designing Austin Energy’s Solar Tariff Using a Distributedtwo-part tariff that recovers both energy and capacity costsa two-part tariff, however, when the energy charge is a (

Darghouth, Naim Richard

2013-01-01T23:59:59.000Z

173

Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines  

Science Conference Proceedings (OSTI)

In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

Phillips, A.

2013-01-31T23:59:59.000Z

174

Characteristics of Gafchromic XRQA2 films for kV image dose measurement  

SciTech Connect

Purpose: In this study, the relevant characteristics of the new Gafchromic XRQA2 film for its application in measuring kV cone beam computed tomography (CBCT) image doses were thoroughly investigated. Methods: The film was calibrated free in air to air kerma levels between 0 and 9 cGy using 120 kVp photon beams produced by the x-ray volume imager. Films were scanned using transmission and reflection scanning modes with the Epson Expression 10000 XL flat-bed document scanner. The impact of film size, region of interest for the analysis, scan uniformity, scan resolution, scan orientation and alternate scanning sides on the analysis process were investigated. Energy dependence, postirradiation growth of reflectance with time and irradiation angular dependence of the film were tested at different air kerma levels. Results: The net reflectance changed by {approx}3% when the size of the film piece changed from 1 cm x 2 cm to 10 cm x 11 cm and changed by {approx}1% when ROI changed from 0. 7 cm x 0. 7 cm to 8 cm x 8 cm, suggesting a good uniformity of the film. The film was successfully analyzed using the transmission scanning mode, calibration curves from both transmission and reflection scanning modes showed similar behavior. The calibration uncertainty was somewhat lower when the film was scanned using reflection mode (6% and 8% for reflection and transmission modes, respectively.) Higher scanning resolution came with increasing calibration uncertainty. The calibration uncertainty for reflection and transmission modes increased from {approx}3.5% to 7% and from {approx}3.5% to 9%, respectively when scanning resolution was changed from 50 to 400 dpi. Scanning the film on alternate sides using transmission mode led to variation of 16%-19% in the net optical density at doses commonly used for CBCT procedures. The film response changed by almost 10% when it was exposed to beams of two different energies (100 and 120 kVp.) Other features of the film such as film orientation, postexposure growth, and irradiation angular dependence were also investigated. Conclusions: The size of film piece and analysis ROI used for calibration slightly affected the film response. Both transmission and reflection scanning modes can be used to analyze the Gafchromic XRQA2, with the reflection mode having a somewhat lower calibration uncertainty. Scanning films on alternate sides using transmission mode significantly affects the optical density. The film response was shown to be energy dependent. The films reached stability in about 6 h after exposure. The film response was proven to be independent of irradiation angle except when the beam is parallel to the film surface.

Giaddui, Tawfik; Cui Yunfeng; Galvin, James; Chen Wenzhou; Yu Yan; Xiao Ying [Department Of Radiation Oncology, Thomas Jefferson University, Philadelphia, Pennsylvania 19107 (United States)

2012-02-15T23:59:59.000Z

175

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

176

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Conference Proceedings (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

177

Rates - WAPA-137 Rate Order  

NLE Websites -- All DOE Office Websites (Extended Search)

WAPA-137 Rate Order WAPA-137 Rate Order 2009 CRSP Management Center Customer Rates Second Step Presentation from the June 25, 2009, Customer Meeting Handout Materials from the June 25, 2009, Customer Meeting Customer Comment Letters ATEA CREDA Farmington ITCA AMPUA Rate Adjustment Information The second step of WAPA-137 SLCA/IP Firm Power, CRSP Transmission and Ancillary Services rate adjustment. FERC Approval of Rate Order No. WAPA-137 Notice Of Filing for Rate Order No. WAPA-137 Published Final FRN for Rate Order No. WAPA-137 Letter to Customers regarding the published Notice of Extension of Public Process for Rate Order No. WAPA-137 Published Extension of Public Process for Rate Order No. WAPA-137 FRN Follow-up Public Information and Comment Forum Flier WAPA-137 Customer Meetings and Rate Adjustment Schedule

178

Energy Rating  

E-Print Network (OSTI)

Consistent, accurate, and uniform ratings based on a single statewide rating scale Reasonable estimates of potential utility bill savings and reliable recommendations on cost-effective measures to improve energy efficiency Training and certification procedures for home raters and quality assurance procedures to promote accurate ratings and to protect consumers Labeling procedures that will meet the needs of home buyers, homeowners, renters, the real estate industry, and mortgage lenders with an interest in home energy ratings

Cabec Conference; Rashid Mir P. E

2009-01-01T23:59:59.000Z

179

Insertion Rates  

Science Conference Proceedings (OSTI)

HOME > Insertion Rates. TECH HEADLINES. Research Explores a New Layer in Additive Manufacturin... Grand Opening Slated for Electron Microscopy Facility.

180

P-D Project Rate Adjustment  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Davis Project Rate Adjustment Data Parker-Davis Project Rate Adjustment Data FY2014 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2013 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Supplemental Information Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2012 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design Preliminary PRS Customer Requested Scenario Final Documents Notification of Rates Final CAS Final Rate Design Final PRS FY2011 Informal Customer Meeting Notification of Meeting Presentation Preliminary CAS Preliminary Rate Design

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Lightning protection requirements of SF/sub 6/ substation determined by hybrid simulator. [115/345 kv station  

SciTech Connect

The development of a hybrid computer simulation which can provide the type and quantity of data necessary for determining the behavior of lightning-caused surges traveling through substations is discussed. Results from a specific application on a 115-kV/345-kV station are presented. The results show that the simulation of SF/sub 6/ substations during lightning-caused surges is ideally accomplished by hybrid computer. The quantity of data for complete substation analysis may be gathered efficiently. In addition, digital graphical summaries provide quick insight into substation behavior. The application of this method to simple configurations has shown the previous assumptions must be carefully reviewed. For example, it is shown by computer simulation and analytical hand calculation that the surges with the steepest wave fronts may not produce the highest substation voltages. It is concluded that this hybrid simulation is an excellent tool in the determination of SF/sub 6/ substation response to lightning-caused surges. (LCL)

Tranen, J.D. (New England Electric System, Westborough, MA); Hedin, R.A.; Minnick, J.J.; Priest, K.W.

1977-01-01T23:59:59.000Z

182

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network (OSTI)

depending on the operating volt- age desired. A singlehas a rating of 2000 x 10 farads at 450 volts DC working. Weon each capacitor to 400 volts with clamping zener diodes. A

Owren, H.

2011-01-01T23:59:59.000Z

183

ESS 2012 Peer Review - 6.5 kV Silicon Carbide Half-Bridge Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Systems to gain critical insight into the impact of a medium voltage switch on inverter systems Phase I - Design of SiC Power Module and Epitaxial Growth (9 months) ...

184

Rate schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

185

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

186

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

187

High speed transfer switch with 50 kA and 50 kV  

SciTech Connect

This paper gives the mechanical design and electrical parameters of a pneumatically operated transfer switch. This design is used to switch 3-second 50-kA current pulses, and is easily capable of 75 kA operation (2 {times} 10{sup 10} I{sup 2}t); with water-cooled versions capable of 20 kA continuously. Although the switch is not specifically designed to make or break 50 kA, it is provided with auxiliary Elkonite arcing contacts have proven their value in protecting the main electrodes even under repetitive (50 kA) fault conditions. Included in this presentation will be the results of extensive life testing and associated criteria. 6 figs., 1 tab.

Reass, W.A.; Kasik, R.J.; Wilds, W.A.

1989-01-01T23:59:59.000Z

188

500-kV Non-Ceramic Insulator Aging Chamber: Final Report  

Science Conference Proceedings (OSTI)

This report will help utilities and manufacturers understand primary non-ceramic insulator (NCI) aging mechanisms and allow them to compare the ability of a number of currently available NCI designs to withstand those aging mechanisms. Research results also will be useful for further development of in-service inspection methods.

2000-11-30T23:59:59.000Z

189

15 KJ FLASH LAMP, POWER CONDITIONING UNIT DESIGNED FOR SAFTY, RELIABILITY & MANUFACTURABILITY*  

SciTech Connect

A 15kJoule, Flash Lamp Power Conditioning Unit has been successfully designed, developed, and deployed in the National Ignition Facility (NIF) Preamplifier Modules (PAM). The primary design philosophy of this power conditioning unit (PCU) is safety, reliability, and manufacturability. Cost reduction over commercially equivalent systems was also achieved through an easily manufactured packaging design optimized to meet NIF requirements. While still maintaining low cost, the PCU design includes a robust control system, fault diagnostic system, and safety features. The pulsed power design includes 6 PFN modules, each including a dual series injection trigger transformer, that drive a total of 12 flash lamp loads. The lamps are individually triggered via a 20kV pulse produced by a 1kV, MCT switched capacitive discharge unit on the primary side of the trigger transformer. The remote control interface includes an embedded controller that captures flash lamp current wave forms and fault status for each shot. The embedded controller provides the flexibility of remotely adjusting both the main drive voltage from 1.6 to 2.5 kV and the trigger voltage from 0 to 20 kV.

James, G; Merritt, B; Dreifuerst, G; Strickland, S

2007-08-07T23:59:59.000Z

190

Development of a 15-kV Class Solid-State Current Limiter  

Science Conference Proceedings (OSTI)

The solid-state current limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the growing problems associated with increasing fault current levels in the electric system. The present utility power delivery infrastructure is on the verge of reaching its maximum capacity and yet demand continues to grow, leading to increases in generation and transmission that result in higher fault currents. The power-electronics-based SSCL is designed to work with the p...

2009-12-23T23:59:59.000Z

191

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Tariff Rates FY 2014 Rates and Rate Schedules FY 2013 Rates and Rate Schedules FY 2012 Rates and Rate Schedules FY 2011 Rates and Rate Schedules FY 2010 Rates and Rate Schedules FY...

192

Review for the State of the Art and Application of Polymer Materials / Insulation used in Distribution Class (12 - 46 kV class) Substations  

Science Conference Proceedings (OSTI)

This report covers the results of a state-of-art study into distribution class (12-46 kV) polymer-based products, the technology used to manufacture them, utility experiences, field potential inspection and diagnostic technique, and utility interest for future research and development to be conducted by EPRI.

2003-11-24T23:59:59.000Z

193

Longitudinal Load and Cascading Failure Risk Assessment (CASE): Central Louisiana Electric Cooperative's 500-kV Toledo-Coushatta Transmission Line  

Science Conference Proceedings (OSTI)

EPRI's Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Central Louisiana Electric Company's (CLECO) 500-kV, single circuit, Toledo-Coushatta transmission line. The methodology also identified the line's cascading potential under different loading conditions.

1998-03-11T23:59:59.000Z

194

Design and testing of a PFN for the washer-gun in SYMPLE  

Science Conference Proceedings (OSTI)

A Pulse Forming Network (PFN) with mutual coupling has been designed, developed and tested for its performance as a pulsed (? 100 µs) high voltage (up to 10 KV) source for washer gun plasma production in SYMPLE (SYstem for Microwave PLasma Experiments). ...

Priyavandna J. Rathod; V. P. Anitha; Z. H. Sholapurwala; Jayesh Raval; Renu Bahl; Y. C. Saxena

2011-02-01T23:59:59.000Z

195

Application Guide for Determining Maximum Switching Transient Overvoltages of Overhead Lines Rated 100 kV and Above Using the Electr omagnetic Transients Program (EMTP)  

Science Conference Proceedings (OSTI)

In recent years, through attrition and in other ways, utilities have lost many of the engineers that once performed time-domain (transient) simulations of their power systems. As a result, using the electromagnetic transients program (EMTP) to perform time-domain simulations of the power system has become a lost art; and, as a consequence, such tasks as being able to easily determine the maximum transient overvoltage for a particular transmission line have become arduous for some utilities. At the same t...

2011-11-30T23:59:59.000Z

196

2009 Rate Design Window Dynamic Pricing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compressed Air Energy Compressed Air Energy Storage (CAES) Hal LaFlash Director Emerging Clean Technologies Pacific Gas and Electric Company November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory 1 Project Need * California regulations will require that utilities procure 33% of their energy from eligible renewables * Scenario projections show that nearly 70% of the renewable energy (23% of total energy) is likely to be provided by variable solar and wind resources. * The CA ISO expects it will need high amounts of flexible resources, especially energy storage, to integrate renewable energy into the grid. * Compressed Air Energy Storage has a long history of being one of the most economic forms of energy storage.

197

2009 Rate Design Window Dynamic Pricing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compressed Air Energy Storage (CAES) Hal LaFlash Director Emerging Clean Technologies Pacific Gas and Electric Company November 3, 2010 Funded in part by the Energy Storage Systems...

198

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

199

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Customer Letter - Preliminary Review of Drought Adder Component for 2011 Firm Power Rates 2010 Rates and Rate Schedule - Current * 2009 Rates and Rate Schedule 2008 Rates and...

200

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

202

Evaluation of Suspected Steady-State Magnetic Induction by a 345-kV Double-Circuit Transmission Line onto Railroad Track  

Science Conference Proceedings (OSTI)

CenterPoint Energy operates a double circuit 345-kV transmission line north of Houston that parallels the Burlington Northern Santa Fe Railroad (BNSF) for approximately 15 miles. The railroad is experiencing elevated steady-state 60-Hz voltage in the parallel exposure. AC voltages and currents in railroad track can come from many sources. And, railroad systems can withstand reasonable amounts of this electromagnetic interference (EMI) without problems. When problems with EMI on a railroad do appear, it i...

2008-11-12T23:59:59.000Z

203

The impact of retail rate structures on the economics of commercial photovoltaic systems in California  

E-Print Network (OSTI)

the impact of retail electricity rate design on the economiccustomer retail electricity rates currently offered in thethe design of retail electricity rates, particularly for

Mills, Andrew D.

2009-01-01T23:59:59.000Z

204

The Impact of Retail Rate Structures on the Economics of Commercial Photovoltaic Systems in California  

E-Print Network (OSTI)

the impact of retail electricity rate design on the economiccustomer retail electricity rates currently offered in thethe design of retail electricity rates, particularly for

Mills, Andrew

2009-01-01T23:59:59.000Z

205

Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

206

Ehv substation equipment challenges both designer and manufacturer  

SciTech Connect

Huge equipment and structures necessary to operate substations at extra-high voltage (ehv) require special design innovations. Because of the phase spacing required more real estate and larger, stronger takeoff structures are necessary. Also, economics (and optimization) becomes a more-important factor in design because of the large investment involved. Because generating plants are increasing steadily in size and are being located more remote from load centers, ehv transmission is becoming more common. Some of the design criteria and costs for ehv-substation equipment that is necessary to terminate the transmission lines at 345 kV and higher voltages are discussed.

Carey, H.D.

1965-12-01T23:59:59.000Z

207

Design of photovoltaic central power station concentrator array  

Science Conference Proceedings (OSTI)

A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

Not Available

1984-02-01T23:59:59.000Z

208

Coaxial 30 kV Connectors for the RG220/U Cable 20 Years of Operational Experience  

E-Print Network (OSTI)

For the fast pulsed magnet system of CERN's SPS and LEP particle accelerators, a special type of moulded coaxial high voltage cable connector is used in large quantities. These connectors are mounted on coaxial transmission lines, which connect pulse generators in buildings at ground level to the fast pulsed magnets situated in an underground tunnel. Well over 1500 such connectors have already been installed and many more will be needed for the construction of the LHC. This 14 TeV Large Hadron Collider, which has a circumference of 27 km, is now under construction at CERN. The paper summarizes the operational experience over the last 20 years and the design principles of the connector. It explains how the excellent reliability and the extremely low failure rate were achieved and outlines the causes of the rare replacements. The paper also discusses the ageing effects caused by radiation, as well as wear and tear during installation and manipulation. Finally it gives a report on our experience with coaxial con...

Mayer, M

2000-01-01T23:59:59.000Z

209

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Loveland Area Project Firm Power Rates Transmission and Ancillary Services Rates 2012 Rate Adjustment-Transmission and Ancillary Services 2010 Rate Adjustment-Firm Power 2009...

210

Rates and Repayment Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates and Repayment Services Consolidated Rate Schedules FY 2014 Rates BCP Annual Rate Process Central Arizona Project Transmission Rate Process DSW Multiple System Transmission...

211

2011 Heat Rate Improvement Conference  

Science Conference Proceedings (OSTI)

With the rising cost of fuel and the strong possibility of CO2 emissions regulations and limitations in the near future, utilities and power generation companies are focusing on power plant heat rate and performance. The Electric Power Research Institute (EPRI) 17th Heat Rate Improvement Conference is the latest in a series of meetings designed to assist attendees in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and sustaining heat rate improve...

2011-03-28T23:59:59.000Z

212

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

213

Rates & Repayment  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Environmental Review-NEPA Financial Data Operations Planning & Projects Power Marketing Rates Rate Adjustments Transmission Ancillary Services Rates WAPA-137 Rate Order Rates and Repayment Services Rates Current and Historical Rate Information Collbran Power Rates CRSP Power Rates CRSP Transmission System Rates CRSP Management Center interest rates Falcon-Amistad Power Rates Provo River Power Rates Rio Grande Power Rates Seedskadee Power Rates SLCA/IP Power Rates Rate Schedules & Supplemental Rate Information Current Rates for Firm Power, Firm & Non-firm Transmission Service, & Ancillary Services Current Transmission & Ancillary Services Rates Tariffs Components of the SLCA/IP Existing Firm Power Rate Cost Recovery Charge (CRC) Page MOA Concerning the Upper Colorado River Basin

214

Commercial Building Asset Rating Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 eere.energy.gov 1 eere.energy.gov Commercial Building Asset Rating Program August 23, 2011 12 p.m. ET, 9 a.m. PT Presenter: Cody Taylor PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 eere.energy.gov Outline * Goals * Scope & schedule * Guiding principles * Program design issues - Metrics - Rating method - Rating scale - Opportunities for efficiency improvement - Quality assurance Please submit clarifying questions during today's webinar via the Q&A function of Live Meeting. 3 eere.energy.gov National Building Rating Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating

215

Failure Analysis of a 345 kV High-Pressure, Fluid-Filled Cable Insulated with Laminated Paper Polypropylene at New York Power Author ity  

Science Conference Proceedings (OSTI)

Three cable pieces of a 345-kV high-pressure, fluid-filled, laminated paper151polypropylene (LPP) cable, each nearly 3 ft in length, were received from New York Power Authority in January 2010. The Detroit Edison Company performed the dissection and analysis to address the cause(s) of the failure that occurred in late December 2009 and that was experienced by this 10.1 circuit-mile cable that had been energized in service in May 1991. One of the pieces contained the failure, and the other two were adjace...

2011-02-28T23:59:59.000Z

216

Bipolar HVDC Transmission System Study Between (+ or -) 600 kV and (+ or -) 1200 kV--Corona Studies, Phase II  

Science Conference Proceedings (OSTI)

This report documents a study of the corona performance characteristics of a 6 x 4.06 cm conductor bundle tested under all possible weather conditions and at voltages ranging from plus/minus 750 to plus/minus 1050 kV. Radio interference, audible noise, and corona loss performance were evaluated, and the influence of line voltage on these parameters was studied. Data were collected on the lateral profiles of radio interference, audible noise, ion current density, and electric field at ground level. Electr...

1982-12-01T23:59:59.000Z

217

The design of a 200 MW interphase power controller prototype  

SciTech Connect

The paper addresses the practical design aspects of a 200 MW prototype for the interconnection of two synchronous 120-kV networks that are close to their short-circuit limits. The Interphase Power Controller is a new concept for the control of active and reactive power; it uses only standard components connected in an original manner. The paper gives the results of EMTP simulations for the conditions governing the design of the components. The significant steady-state and transient capabilities of the components are given as well as insulation coordination and protection aspects. Finally, a preliminary layout is presented for the prototype.

Habashi, K.; Lombard, J.J.; Mourad, S. (ABB Canada, Inc., Montreal, Quebec (Canada)); Pelletier, P.; Morin, G.; Beauregard, F.; Brochu, J. (CITEQ, Varennes, Quebec (Canada))

1994-04-01T23:59:59.000Z

218

Benchmarking and Performance Based Rating System for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

and green building rating systems such as Leadership in Energy and Environment Design (LEED-India) and Green Rating for Integrated Habitat Assessment (GRIHA) have been the prime...

219

Experimental Design for a Sponge-Wipe Study to Relate the Recovery Efficiency and False Negative Rate to the Concentration of a Bacillus anthracis Surrogate for Six Surface Materials  

SciTech Connect

Two concerns were raised by the Government Accountability Office following the 2001 building contaminations via letters containing Bacillus anthracis (BA). These included the: 1) lack of validated sampling methods, and 2) need to use statistical sampling to quantify the confidence of no contamination when all samples have negative results. Critical to addressing these concerns is quantifying the probability of correct detection (PCD) (or equivalently the false negative rate FNR = 1 ? PCD). The PCD/FNR may depend on the 1) method of contaminant deposition, 2) surface concentration of the contaminant, 3) surface material being sampled, 4) sample collection method, 5) sample storage/transportation conditions, 6) sample processing method, and 7) sample analytical method. A review of the literature found 17 laboratory studies that focused on swab, wipe, or vacuum samples collected from a variety of surface materials contaminated by BA or a surrogate, and used culture methods to determine the surface contaminant concentration. These studies quantified performance of the sampling and analysis methods in terms of recovery efficiency (RE) and not PCD/FNR (which left a major gap in available information). Quantifying the PCD/FNR under a variety of conditions is a key aspect of validating sample and analysis methods, and also for calculating the confidence in characterization or clearance decisions based on a statistical sampling plan. A laboratory study was planned to partially fill the gap in PCD/FNR results. This report documents the experimental design developed by Pacific Northwest National Laboratory and Sandia National Laboratories (SNL) for a sponge-wipe method. The study will investigate the effects on key response variables from six surface materials contaminated with eight surface concentrations of a BA surrogate (Bacillus atrophaeus). The key response variables include measures of the contamination on test coupons of surface materials tested, contamination recovered from coupons by sponge-wipe samples, RE, and PCD/FNR. The experimental design involves 16 test runs, to be performed in two blocks of eight runs. Three surface materials (stainless steel, vinyl tile, and ceramic tile) were tested in the first block, while three other surface materials (plastic, painted wood paneling, and faux leather) will be tested in the second block. The eight surface concentrations of the surrogate were randomly assigned to test runs within each block. Some of the concentrations will be very low and may present challenges for deposition, sampling, and analysis. However, such tests are needed to investigate RE and PCD/FNR over the full range of concentrations of interest. In each run, there will be 10 test coupons of each of the three surface materials. A positive control sample will be generated prior to each test sample. The positive control results will be used to 1) calculate RE values for the wipe sampling and analysis method, and 2) fit RE- and PCD-concentration equations, for each of the six surface materials. Data analyses will support 1) estimating the PCD for each combination of contaminant concentration and surface material, 2) estimating the surface concentrations and their uncertainties of the contaminant for each combination of concentration and surface material, 3) estimating RE (%) and their uncertainties for each combination of contaminant concentration and surface material, 4) fitting PCD-concentration and RE-concentration equations for each of the six surface materials, 5) assessing goodness-of-fit of the equations, and 6) quantifying the uncertainty in PCD and RE predictions made with the fitted equations.

Piepel, Gregory F.; Amidan, Brett G.; Krauter, Paula; Einfeld, Wayne

2010-12-16T23:59:59.000Z

220

Experimental Design for a Sponge-Wipe Study to Relate the Recovery Efficiency and False Negative Rate to the Concentration of a Bacillus anthracis Surrogate for Six Surface Materials  

DOE Green Energy (OSTI)

Two concerns were raised by the Government Accountability Office following the 2001 building contaminations via letters containing Bacillus anthracis (BA). These included the: 1) lack of validated sampling methods, and 2) need to use statistical sampling to quantify the confidence of no contamination when all samples have negative results. Critical to addressing these concerns is quantifying the false negative rate (FNR). The FNR may depend on the 1) method of contaminant deposition, 2) surface concentration of the contaminant, 3) surface material being sampled, 4) sample collection method, 5) sample storage/transportation conditions, 6) sample processing method, and 7) sample analytical method. A review of the literature found 17 laboratory studies that focused on swab, wipe, or vacuum samples collected from a variety of surface materials contaminated by BA or a surrogate, and used culture methods to determine the surface contaminant concentration. These studies quantified performance of the sampling and analysis methods in terms of recovery efficiency (RE) and not FNR (which left a major gap in available information). Quantifying the FNR under a variety of conditions is a key aspect of validating sample and analysis methods, and also for calculating the confidence in characterization or clearance decisions based on a statistical sampling plan. A laboratory study was planned to partially fill the gap in FNR results. This report documents the experimental design developed by Pacific Northwest National Laboratory and Sandia National Laboratories (SNL) for a sponge-wipe method. The testing was performed by SNL and is now completed. The study investigated the effects on key response variables from six surface materials contaminated with eight surface concentrations of a BA surrogate (Bacillus atrophaeus). The key response variables include measures of the contamination on test coupons of surface materials tested, contamination recovered from coupons by sponge-wipe samples, RE, and FNR. The experimental design involves 16 test runs, performed in two blocks of eight runs. Three surface materials (stainless steel, vinyl tile, and ceramic tile) were tested in the first block, while three other surface materials (plastic, painted wood paneling, and faux leather) were tested in the second block. The eight surface concentrations of the surrogate were randomly assigned to test runs within each block. Some of the concentrations were very low and presented challenges for deposition, sampling, and analysis. However, such tests are needed to investigate RE and FNR over the full range of concentrations of interest. In each run, there were 10 test coupons of each of the three surface materials. A positive control sample was generated at the same time as each test sample. The positive control results will be used to 1) calculate RE values for the wipe sampling and analysis method, and 2) fit RE- and FNR-concentration equations, for each of the six surface materials. Data analyses will support 1) estimating the FNR for each combination of contaminant concentration and surface material, 2) estimating the surface concentrations and their uncertainties of the contaminant for each combination of concentration and surface material, 3) estimating RE (%) and their uncertainties for each combination of contaminant concentration and surface material, 4) fitting FNR-concentration and RE-concentration equations for each of the six surface materials, 5) assessing goodness-of-fit of the equations, and 6) quantifying the uncertainty in FNR and RE predictions made with the fitted equations.

Piepel, Gregory F.; Amidan, Brett G.; Krauter, Paula; Einfeld, Wayne

2011-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Conceptual design of air-core superconducting power transformer for cable transmission system  

Science Conference Proceedings (OSTI)

The air-core superconducting transformer, which has a large magnetizing current, has been proposed as a power transformer that has the function as a shunt reactor. In this paper, the basic design procedure for the air-core superconducting transformer is presented. By using this procedure, 500/{radical}(3kV)--66/{radical}(3kV)--300 MVA single phase air-core transformer is designed for a model cable transmission system. Then, the performance of this transformer in the model cable transmission system is analyzed, and it is confirmed that the air-core superconducting transformer can function as a shunt reactor in addition to the principal as a power transformer.

Yamaguchi, Hiroshi; Sato, Yukihiko; Kataoka, Teruo [Tokyo Inst. of Tech. (Japan). Dept. of Electrical and Electronic Engineering

1996-04-01T23:59:59.000Z

222

Design of the EBIS vacuum system  

SciTech Connect

At Brookhaven National Laboratory the Electron Beam Ion Source (EBIS) is presently being commissioned. The EBIS will be a new heavy ion pre-injector for the Relativistic Heavy Ion Collider (RHIC). The new preinjector has the potential for significant future intensity increases and can produce heavy ion beams of all species including uranium. The background pressure in the ionization region of the EBIS required to be low enough that it does not produce a significant number of ions from background gas. The pressure in the regions of the electron gun and electron collector can be higher than in the ionization region provided there is efficient vacuum separation between the sections. For injection the ions must be accelerated to 100KV by pulsing the EBIS platform. All associated equipment including the vacuum equipment on the platform is at a 100KV potential. The vacuum system design and the vacuum controls for the EBIS platform and transport system will be presented as well as the interface with the Booster Ring which has a pressure 10-11 Torr.

Mapes, M.; Smart, L.; Weiss, D.

2011-03-28T23:59:59.000Z

223

EPRI's Twelfth Heat Rate Improvement Conference Proceedings  

Science Conference Proceedings (OSTI)

The Twelfth Heat Rate Improvement Conference, sponsored by EPRI's Heat Rate and Cost Optimization Value Package, is the latest in a series of meetings designed to assist utilities in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and maintaining heat rate improvement. The last conference was held in Baltimore in September 1998.

2001-01-22T23:59:59.000Z

224

Energy Management Through Innovative Rates  

E-Print Network (OSTI)

Increased costs and a continuing dependence on uncertain supplies of domestic and foreign energy resources have prompted many companies to focus their attention on energy management. The author explores the potential for achieving a greater measure of energy efficiency in the industrial sector and specific rate design alternatives for doing so.

Williams, M. L.

1982-01-01T23:59:59.000Z

225

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

226

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

227

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

228

Comparisons of field performance to closed-door test T ABLE 1 ratings indicate the laboratory procedure is a valid indica-Design Options to Improve the Energy Efficiency of a  

E-Print Network (OSTI)

#12;#12;Comparisons of field performance to closed-door test T ABLE 1 ratings indicate commercially manufactured refrigerators were u~ as laboratory test beds, a testing sequence of ..as PHASE I cabinets with an optimized Option 2 Evaporator/condenser size, surface r~frige~tion circuit or cvcle were

Oak Ridge National Laboratory

229

Design of a photovoltaic central power station: flat-plate array  

DOE Green Energy (OSTI)

A design for a photovoltaic central power station using fixed flat-panel arrays has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes high-efficiency photovoltaic modules using dendritic web cells. The modules are arranged in 5 MW subfields, each with its own power conditioning unit. The photovoltaic output is connected to the existing 115 kV utility switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

Not Available

1984-02-01T23:59:59.000Z

230

Distributed Rate Allocation for Wireless Networks  

E-Print Network (OSTI)

This paper describes a distributed algorithm for rate allocation in wireless networks. As the main result, the paper establishes that this algorithm is throughput-optimal for very general class of throughput regions. In contrast to distributed on-off scheduling algorithms, this algorithm enables optimal utilization of physical layer schemes by scheduling multiple rate levels. The algorithm is based on a Markov process on these discrete set of rates with certain transition rates. For dealing with multiple rate levels, the paper introduces an important structure for the transition rates, which enable the design of appropriate update rule for these transition rates. The update uses local queue length information alone, and thus does not require global exchange of queue length information. In addition, the algorithm requires that each link can determine the feasibility of increasing its data-rate from the current value without reducing the data-rates of other links. Determining rate feasibility does not introduce...

Jose, Jubin

2010-01-01T23:59:59.000Z

231

Meta-design: design for designers  

Science Conference Proceedings (OSTI)

One fundamental challenge for the design of the interactive systems of the future is to invent and design environments and cultures in which humans can express themselves and engage in personally meaningful activities. Unfortunately, a large number of ... Keywords: consumer and designer mindsets, designing “out of the box”, domain-oriented design environments, evolutionary growth, impact of new media on design, open evolvable systems, open source, reseeding model, seeding, underdesigned systems

Gerhard Fischer; Eric Scharff

2000-08-01T23:59:59.000Z

232

Design Fires for Structures Project  

Science Conference Proceedings (OSTI)

... eg, ISO 834), or prescribed, non-standard heating rates (provided by oil-burners). ... the design of the fuel delivery system (eg, natural gas burners) to ...

2013-11-13T23:59:59.000Z

233

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 44 Waukesha Electric System, Inc OE Southern Cal Edison activities Energy Delivery Technologies Div 2010 David Szucs approx. July 2010- January 2015 Irvine, CA "Recovery Act-Fault Current Limiting (FCL) Superconducting Transformer" Southern California Edison will install & operate a prototype FCL superconducting transformer rated 28 MVA, 66kV/12kV service, built by Waukesha Electric, in their MacArthur substation as a demonstration. 07 02 2010 David Szucs Digitally signed by David Szucs DN: cn=David Szucs, o=NETL, ou=EDTD, email=szucs@netl.doe.gov, c=US Date: 2010.07.02 13:16:07 -04'00' 07 16 2010 Fred E. Pozzuto Digitally signed by Fred E. Pozzuto DN: cn=Fred E. Pozzuto, o=USDOE, ou=NETL-Office of Project Facilitation and Compliance, email=fred.pozzuto@netl.doe.gov, c=US

234

Tracking the Libor Rate  

E-Print Network (OSTI)

Investigating the Libor Rate,” mimeo. Abrantes-Metz, R. ,Libor data: Historial 1 month Libor rates, British Bankers1108R) Tracking the Libor Rate Rosa M. Abrantes-Metz , Sofia

Abrantes-Metz, Rosa; Villas-Boas, Sofia B.; Judge, George G.

2013-01-01T23:59:59.000Z

235

Positive design  

Science Conference Proceedings (OSTI)

This article is focused on the changes needed in design to create positive solutions for all involved in design processes. It draws upon the rich discussion and discourse from a conference focused on positive design involving managers, designers, and ...

Jurgen Faust

2009-09-01T23:59:59.000Z

236

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

237

Rail Coal Transportation Rates  

U.S. Energy Information Administration (EIA)

figure data Figure 7 shows the percent change in average real rates for those state-to-state ... Estimated transportation rates for coal delivered to electric ...

238

2012 Rate Adjustments  

NLE Websites -- All DOE Office Websites (Extended Search)

Register Notices Meetings Brochure Brochure Addendum Customer Comment Letter Approved Rate Order FERC Confirmation If you have questions, call Rates and Repayment, 800-472-2306...

239

Effective Rate Period  

NLE Websites -- All DOE Office Websites (Extended Search)

10012012 - 09302013 Mid-Year Changes (if applicable) 10012012 - 09302013 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement 73,381,487...

240

Design and operating experience of an ac-dc power converter for a superconducting magnetic energy storage unit  

DOE Green Energy (OSTI)

The design philosophy and the operating behavior of a 5.5 kA, +-2.5 kV converter, being the electrical interface between a high voltage transmission system and a 30 MJ superconducting coil, are documented in this paper. Converter short circuit tests, load tests under various control conditions, dc breaker tests for magnet current interruption, and converter failure modes are described.

Boenig, H.J.; Nielsen, R.G.; Sueker, K.H.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electricity Rate Structures and the Economics of Solar PV: Could Mandatory Time-of-Use Rates Undermine California’s Solar Photovoltaic Subsidies?  

E-Print Network (OSTI)

CSEM WP 172 Electricity Rate Structures and the Economics of94720-5180 www.ucei.org Electricity Rate Structures and thefuture of California electricity rate levels and rate design

Borenstein, Severin

2007-01-01T23:59:59.000Z

242

A Successful Cool Storage Rate  

E-Print Network (OSTI)

Houston Lighting & Power (HL&P) initiated design and development of its commercial cool storage program as part of an integrated resource planning process with a targeted 225 MW of demand reduction through DSM. Houston's extensive commercial air conditioning load, which is highly coincident with HL&P's system peak, provided a large market for cool storage technologies. Initial market research made it very clear that a special cool storage rate was required to successfully market the technology. Development of the rate required an integrated, multidepartment effort and extensive use of DSManager, an integrated resource planning model. An experimental version of the rate was initially implemented as part of the initial phase of the cool storage program. A permanent rate, incorporating lessons learned from the experimental rate, was then developed for the long term implementation of the program. The permanent rate went through a lengthy regulatory approval process which included intervention by a local natural gas distribution company. The end result is a very successful cool storage program with 52 projects and 31 megawatts of demand reduction in the first three and one-half years of program implementation.

Ahrens, A. C.; Sobey, T. M.

1994-01-01T23:59:59.000Z

243

LINEAR COUNT-RATE METER  

DOE Patents (OSTI)

A linear count-rate meter is designed to provide a highly linear output while receiving counting rates from one cycle per second to 100,000 cycles per second. Input pulses enter a linear discriminator and then are fed to a trigger circuit which produces positive pulses of uniform width and amplitude. The trigger circuit is connected to a one-shot multivibrator. The multivibrator output pulses have a selected width. Feedback means are provided for preventing transistor saturation in the multivibrator which improves the rise and decay times of the output pulses. The multivibrator is connected to a diode-switched, constant current metering circuit. A selected constant current is switched to an averaging circuit for each pulse received, and for a time determined by the received pulse width. The average output meter current is proportional to the product of the counting rate, the constant current, and the multivibrator output pulse width.

Henry, J.J.

1961-09-01T23:59:59.000Z

244

Optimal designs for conjoint experiments  

Science Conference Proceedings (OSTI)

In conjoint experiments, each respondent receives a set of profiles to rate. Sometimes, the profiles are expensive prototypes that respondents have to test before rating them. Designing these experiments involves determining how many and which profiles ... Keywords: Conjoint experiments, D-optimality, Optimal block design, Optimal block sizes, Prototype testing

Roselinde Kessels; Peter Goos; Martina Vandebroek

2008-01-01T23:59:59.000Z

245

rates | OpenEI  

Open Energy Info (EERE)

rates rates Dataset Summary Description This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011. Source NREL and Ventyx Date Released February 24th, 2012 (2 years ago) Date Updated Unknown Keywords electric rates rates US utilities Data text/csv icon IOU rates by zipcode (csv, 1.7 MiB) text/csv icon Non-IOU rates by zipcode (csv, 2.1 MiB)

246

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Pebble Springs-Marion 500-KV Line Study Area 75-B.  

SciTech Connect

Proposed is construction of an approximately 160 mile long, 500-kV, double-circuit transmission line from the proposed Pebble Springs Substation located southeast of Arlington, Oregon, to the existing Marion Substation, 11 miles west of Maupin, Oregon. Development is also proposed of a major switching complex, Pebble Springs Substation, near Arlington, Oregon. Depending on the final route chosen, from 45 to 71 miles of parallel, 9 to 42 miles of new, and 74 miles of existing right-of-way will be required. New access road requirements will range from 45 to 90 miles. Land use affected by the proposed facilities includes 800 to 855 acres of forestland removed from timber production. In addition, 50 miles of cropland, primarily wheat, and approximately 35 miles of grassland will be crossed. Disturbance to wildlife during construction will occur and habitat associated with the above land uses will be eliminated. Soil erosion and siltation, primarily during and immediately after construction will also occur. Visual impacts will occur near several highways, lakes, rivers, and recreation areas. Disturbances to nearby residents will occur during construction. An additional 45 acres of rangeland will be required for the proposed Pebble Springs Substation.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

247

Proceedings 2013 Heat Rate Improvement Conference  

Science Conference Proceedings (OSTI)

With the rising cost of fuel and the strong possibility of CO2 emissions regulations and limitations in the near future, utilities and power generation companies are focusing on power plant heat rate and performance. The 18th Heat Rate Improvement Conference is the latest in a series of meetings designed to assist attendees in addressing problems with power plant performance and identifying cost-effective solutions for achieving and sustaining heat rate ...

2013-04-05T23:59:59.000Z

248

2007 EPRI Heat Rate Improvement Conference Proceedings  

Science Conference Proceedings (OSTI)

Due to the rising cost of fuel and the growing possibility of carbon taxes in the not-too-distant future, utilities are once again focusing on the heat rate and performance of coal-fired power plants. The fifteenth Heat Rate Improvement Conference is the latest in this series of meetings designed to assist utilities in addressing problems with power plant performance and in identifying cost-effective solutions for achieving and maintaining heat rate improvement.

2007-03-30T23:59:59.000Z

249

Historical Interest Rates  

NLE Websites -- All DOE Office Websites (Extended Search)

Current and Historical Interest Rates Current and Historical Interest Rates The table lists interest rates, from the project's inception through the present, for all projects with repayment supervised by the CRSP MC. The latest available interest rate is used for all future interest rate calculations. The Amistad-Falcon, Collbran, Provo River, and Rio Grande Projects are all assigned the average daily "Yield Rate" calculated by the U.S. Treasury, on an annual basis, for Treasury bonds having terms of 15 years or more remaining to maturity. The calculated yield rate is rounded to the nearest one-eighth of one percent. The yield rate is based upon the bond's interest rate, as well as its market value. The Colorado River Storage Project and its participating projects, Dolores and Seedskadee, are assigned the average daily "Coupon Rate," annualized for the same U.S. Treasury bonds used in "Yield Rate" calculations. The coupon rate is the interest rate that the bond carries upon its face.

250

Development of a New Multilevel Converter-Based Intelligent Universal Transformer: Design Analysis  

Science Conference Proceedings (OSTI)

This report provides a comprehensive design analysis of a high-voltage multilevel converter-based intelligent universal transformer (IUT). The proposed IUT design includes back-to-back, interconnected, multi-level converters coupled to a switched inverter circuit via a high-frequency transformer. The input of the universal transformer can be coupled to a high-voltage distribution system such as 4.16-kV with the use of existing high-voltage silicon insulated-gate bipolar transistor (IGBT) devices, and the...

2004-03-29T23:59:59.000Z

251

Tracking the Libor Rate  

E-Print Network (OSTI)

Paper 1108R2 Paper 1108R) Tracking the Libor Rate Rosa M.revision 2013 by author(s). Tracking the Libor Rate Rosa M.providing a methodology for tracking the dynamic integrity

Abrantes-Metz, Rosa; Villas-Boas, Sofia B.; Judge, George G.

2013-01-01T23:59:59.000Z

252

2009 Rate Adjustments  

NLE Websites -- All DOE Office Websites (Extended Search)

provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms and approves them on a final basis or until they are replaced by other rates....

253

Mouse heart rate  

NLE Websites -- All DOE Office Websites (Extended Search)

Mouse heart rate Name: amj Status: NA Age: NA Location: NA Country: NA Date: Around 1993 Question: Is it possible to get the heart rate of a mouse without special equipment?...

254

Dynamics of heart rate  

Science Conference Proceedings (OSTI)

Heart rate oscillates on several different time scales and has long?term variability in the form of 1/fnoise. The physiological control of heart rate is briefly reviewed

Daniel T. Kaplan; Mario Talajic

1991-01-01T23:59:59.000Z

255

Design and testing of a 13. 75-MW converter for a superconducting magnetic-energy-storage system  

DOE Green Energy (OSTI)

A 30 MJ superconducting magnetic energy storage system will be installed in 1982 in Tacoma, WA, to act as a transmission line stabilizer. Two 6 MVA transformers and a 5.5 kA, + 2.5 kV converter will connect the superconducting coil to the 13.8 kV bus and regulate the power flow between the coil and the three phase system. The design philosophy for the converter including its control and protection system is given in the paper. The converter has been tested with 10% overvoltage at no load, with 10% overcurrent at zero output voltage and with a watercooled resistive load of about 1 MW. These test results show that the converter will meet the expected full load operating conditions.

Boenig, H.J.; Turner, R.D.; Neft, C.L.; Sueker, K.H.

1981-01-01T23:59:59.000Z

256

Intermediate-to-High-Rate Material Behavior - Programmaster.org  

Science Conference Proceedings (OSTI)

Oct 19, 2011 ... High-Strain-Rate & Shock Response of Lightweight Materials: How Dynamic Properties Influence the Future Design Landscape for ...

257

About the Ratings  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 Ratings Changes 2008 Ratings Changes EPA's "New" Fuel Economy Ratings Video about EPA's New Fuel Economy Ratings Windows Media Video (6.8 MB) Quicktime Video (7.8 MB) Text Version EPA changed the way it estimates fuel economy starting with the 2008 model year. This "new" way of estimating fuel economy supplements the previous method by incorporating the effects of Faster speeds and acceleration Air conditioner use Colder outside temperatures What else do I need to know about the "new" ratings? The tests lower MPG estimates for most vehicles. View old/new MPG ratings for a specific vehicle The actual mileage you get will still vary based on your driving habits, traffic conditions, and other factors. All MPG estimates in Find-a-Car have been converted to the new

258

Effective Rate Period  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2014 Fiscal Year 2014 Effective Rate Period As of Beginning of the FY 10/01/2013 - 09/30/2014 Mid-Year Changes (if applicable) 10/01/2013 - 09/30/2014 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement $73,441,557 CV-F13 Base Resource Revenue Requirement $69,585,875 First Preference Revenue Requirement $3,855,682

259

High Redshift Supernova Rates  

E-Print Network (OSTI)

We use a sample of 42 supernovae detected with the Advanced Camera for Surveys on-board the Hubble Space Telescope as part of the Great Observatories Origins Deep Survey to measure the rate of core collapse supernovae to z~0.7 and type Ia supernovae to z~1.6. This significantly increases the redshift range where supernova rates have been estimated from observations. The rate of core collapse supernovae can be used as an independent probe of the cosmic star formation rate. Based on the observations of 17 core collapse supernovae, we measure an increase in the core collapse supernova rate by a factor of 1.6 in the range 0.3rate. The increase in the rate in this redshift range in consistent with recent measurements of the star formation rate derived from UV-luminosity densities and IR datasets. Based on 25 type Ia supernovae, we find a SN Ia rate that is a factor 3-5 higher at z~1 compared to earlier estimates at lower redshifts (zrate traces a higher star formation rate at redshifts z>1 compared to low redshift. At higher redshift (z>1), we find a suggested decrease in the type Ia rate with redshift. This evolution of the Ia rate with redshift is consistent with a type Ia progenitor model where there is a substantial delay between the formation of the progenitor star and the explosion of the supernova. Assuming that the type Ia progenitor stars have initial main sequence masses 3-8 M_Sun, we find that 5-7% of the available progenitors explode as type Ia supernovae.

Tomas Dahlen; Louis-Gregory Strolger; Adam G. Riess; Bahram Mobasher; Ranga-Ram Chary; Christopher J. Conselice; Henry C. Ferguson; Andrew S. Fruchter; Mauro Giavalisco; Mario Livio; Piero Madau; Nino Panagia; John L. Tonry

2004-06-24T23:59:59.000Z

260

Rate Schedule CPP-2  

NLE Websites -- All DOE Office Websites (Extended Search)

or rate schedule accepted or approved by the Federal Energy Regulatory Commission (FERC) or other regulatory bodies will be passed on to each relevant customer. The FERC's or...

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Javascript Design  

Science Conference Proceedings (OSTI)

From the Publisher:JavaScript Design shows designers how to create interactive JavaScript applications for the Web. It provides detailed descriptions of:JavaScript structures, statements and objectsUsing JavaScript to create different ...

Bill B. Sanders

2001-12-01T23:59:59.000Z

262

Experimental design  

Science Conference Proceedings (OSTI)

Maximizing data information requires careful selection, termed design, of the points at which data are observed. Experimental design is reviewed here for broad classes of data collection and analysis problems, including: fractioning techniques ... Keywords: Key Design Issues in Data Mining, Science and Technology, Statistical Fundamentals

J. P. Morgan; Xinwei Deng

2012-03-01T23:59:59.000Z

263

Exchange Rates and Fundamentals  

E-Print Network (OSTI)

We show analytically that in a rational expectations present-value model, an asset price manifests near–random walk behavior if fundamentals are I(1) and the factor for discounting future fundamentals is near one. We argue that this result helps explain the well-known puzzle that fundamental variables such as relative money supplies, outputs, inflation, and interest rates provide little help in predicting changes in floating exchange rates. As well, we show that the data do exhibit a related link suggested by standard models—that the exchange rate helps predict these fundamentals. The implication is that exchange rates and fundamentals are linked in a way that is broadly consistent with asset-pricing models of the exchange rate. I.

Charles Engel; Kenneth D. West

2005-01-01T23:59:59.000Z

264

Designing Creativity  

E-Print Network (OSTI)

Is it possible to design for creativity? This is one of the most important research questions in AI and Design. This paper raises the question whether automated software agent design can be creative. Not only is the artefact dynamic in the sense that it adapts to its environment, it is also autonomous: an agent decides on its own when to be modified and by whom. An agent's functionality may evolve beyond the expectations of its designers and/or users resulting in very new, unique artefacts. Is this type of design creative? Is the process creative? The result? 1.

Frances M. T. Brazier; Niek J. E. Wijngaards

2002-01-01T23:59:59.000Z

265

The impact of retail rate structures on the economics of commercial photovoltaic systems in California  

E-Print Network (OSTI)

design of retail electricity tariffs and want to understandof commercial electricity tariffs in the United States,the structure of retail electricity tariffs. Rate Design for

Mills, Andrew D.

2009-01-01T23:59:59.000Z

266

The Impact of Retail Rate Structures on the Economics of Commercial Photovoltaic Systems in California  

E-Print Network (OSTI)

design of retail electricity tariffs and want to understandof commercial electricity tariffs in the United States,the structure of retail electricity tariffs. Rate Design for

Mills, Andrew

2009-01-01T23:59:59.000Z

267

Rate design is the no. 1 energy efficiency tool  

SciTech Connect

It is one thing to understand the theory of efficient pricing and another thing to actually implement it. However, the job is getting easier, as wholesale markets simplify the task of estimating marginal generation and transmission costs, advanced metering infrastructure makes time-varying pricing feasible, and the industry recognizes the value of straightforward, easy-to-understand prices. (author)

Parmesano, Hethie

2007-07-15T23:59:59.000Z

268

OpenEI - rates  

Open Energy Info (EERE)

U.S. Electric Utility U.S. Electric Utility Companies and Rates: Look-up by Zipcode (Feb 2011) http://en.openei.org/datasets/node/899 This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011.

269

<RatesMiscInfo>  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates MISCELLANEOUS INFORMATION Power Supply Report June 2013 (53kb pdf) May 2013 (53kb pdf) April 2013 (52kb pdf) March 2013 (54kb pdf) February 2013 (54kb pdf) January 2013 (54kb...

270

Heat Rate Program Guidelines  

Science Conference Proceedings (OSTI)

Power plant facilities with performance or heat rate improvement programs perform better than those that do not have those programs. A heat rate improvement program typically provides sufficient information for decision making with respect to timely maintenance actions and/or operational adjustments. Monitoring the performance of any power plant component includes the trending of parameters that also describe the performance of other plant components, providing insight and information on improving ...

2012-12-31T23:59:59.000Z

271

Cat Heart Rate Monitoring  

NLE Websites -- All DOE Office Websites (Extended Search)

Cat Heart Rate Monitoring Cat Heart Rate Monitoring Name: Shakti Status: student Grade: 9-12 Location: TX Country: USA Date: Summer 2010 Question: What is the best way to find a cat's heart rate using a stethoscope? Because I have tried to hear their heart beat but their purring is all I can hear. If I shouldn't use a stethoscope, then what should I use? Replies: Hi Shakti! If you want to use a stethoscope, the trick is to get your cat to stop purring. Two good ways that I have found to help stop the purring 1. Cover their nose (generally cats don't like this and will stop purring) or 2. Put on the tap to drip or lightly stream water (also, they generally don't like this and will stop purring). Alternatively, you can get their heart rate from feeling their pulse. A good place to try to feel a pulse is right where the leg attaches to the abdomen - in an area called the inguinal region. Now granted there are some heart conditions that will cause an animals pulse and their heart rates don't match up, and it's hard to feel if you have a fat cat, but it's a good place to try if you are really trying to get a heart rate in a healthy kitty!

272

Tests show ability of vacuum circuit breaker to interrupt fast transient recovery voltage rates of rise of transformer secondary faults  

Science Conference Proceedings (OSTI)

A vacuum circuit breaker demonstrated its ability to interrupt short circuits with faster than normal rates of rise of transient recovery voltage (TRV) at levels greater than those produced by most transformer secondary faults. Two recent exploratory test programs evaluated the interrupting ability of a 15kV vacuum circuit breaker containing interrupters of the rotating arc type with contacts made from a chromium-copper powder metal mixture. The interrupting conditions covered a wide range of currents from 10% to 130% of the 28kA rated short circuit current of the tested circuit breaker and a wide range of TRV rates of rise, including the relatively slow rate of rise, normally used in testing and found in most indoor circuit breaker applications, two faster rates of rise equaling and exceeding those found in a known power plant transformer secondary protection application, and the fastest rates of rise possible in the laboratory which exceed the requirements of most transformer secondary faults. These tests showed that the interrupting performance of the tested vacuum circuit breaker was unaffected by the TRV rate of rise to the fastest rates available in the test lab. Such a vacuum circuit breaker can therefore be used without TRV modifying capacitors to slow down the rate of rise provided by the power system. This ability is particularly important if analysis shows that the expected TRV from a transformer secondary fault has a fast rate of rise beyond the recognized ability of an older circuit breaker to acceptably interrupt.

Smith, R.K. [Westinghouse Science and Technology Center, Pittsburgh, PA (United States)

1995-01-01T23:59:59.000Z

273

Trade, Interdependence and Exchange Rates  

E-Print Network (OSTI)

period is 1971-2000. All inflation rates and predictions areof Goods and Real Exchange Rate Fluc- tuations,” mimeo [5]Between Trade and Exchange Rate Volatility,” mimeo [6

Fitzgerald, Doireann

2004-01-01T23:59:59.000Z

274

Exchange Rates, Information, and Crises  

E-Print Network (OSTI)

3 Intervention and Exchange Rate Misalignment 4 Conclusion 5explain the exchange rate determination puzzle? Americanrisk to defend the exchange rate. Universit¨at Trier Working

Fernholz, Ricardo Turrin

2011-01-01T23:59:59.000Z

275

Home Energy Ratings and Building Performance  

E-Print Network (OSTI)

This paper provides an overview of the Home Energy Rating System (HERS). A short summary of the origination and history of the HERS system will lead to a more detailed description of the inspection and testing protocol. The HERS rating provides an accepted method to determine home efficiency based on standards developed and overseen by the Residential Energy Services Network (RESNET), a not-for-profit corporation. The paper will discuss the effect of various building systems and effects of local climate as they affect the rating score of a proposed or completed structure. The rating is used to determine the most cost effective mechanical systems, building envelope design including window and door types, effect of various roofing materials and radiant barriers. The paper will conclude by comparing specifics of an actual report to the construction characteristics of a home as they relate to the HERS Rating and the result.

Gardner, J.C.

2008-12-01T23:59:59.000Z

276

Design Specifications  

NLE Websites -- All DOE Office Websites (Extended Search)

Design Design Specifications Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) OSCARS Case Study Documentation User Manual FAQ Design Specifications Functional Specifications Notifications Publications Authorization Policy Default Attributes Message Security Clients For Developers Interfaces Links Hardware Requirements DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Design Specifications OSCARS Reservation Manager - Design Specifications Year 3 Update (DRAFT) David Robertson, Chin Guok

277

BCP Annual Rate Process  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 BCP Annual Rate Process 2013 BCP Annual Rate Process Informal Process Rate Activity Schedule (doc) Informal Customer Meeting Thursday March 6, 2013 at 10:30 A.M. Conf Rms 3&4 Informal Customer Meeting Presentation (Pdf) PRS Executive Summary (Mar 07, 2013) (Pdf) FY2014 Final Ten Year Operating Plan PRS Executive Summary (PDF) FORM for Foreign Visits (doc) Formal Process Initial Federal Register Notice (pdf) Public Information Forum March 27,2013 at 10:30 A.M. Conf Rms3&4 Customer Meeting Presentation PIF Presentation (PPT) Presentation Details (pdf) Reclamation Fund Status Report PIF PRS Executive Summary (pdf) PIF Transcripts (PDF) Visitor Center Cost Analysis Questions - Responses Public Comment Forum April 10, 2013 at 10:30 A.M. Conf Rms3&4 PCF Transcripts Customer Letters

278

Multiple System Rate Process  

NLE Websites -- All DOE Office Websites (Extended Search)

DSW Multiple System Transmission Rate Process DSW Multiple System Transmission Rate Process Federal Register Notice Withdrawing Rate Proposal (PDF) Formal Process Extension Federal Register Notice (PDF) Customer Savings Under Various MSTR (XLS) Public Information Forum March 29, 2005 Customer Meeting Overview (Power Point) Customer Meeting Overview (PDF) Customer Meeting Transcript (PDF) Public Comment Forum April 6, 2005 Customer Meeting Transcript (PDF) Response Letter 5-17-05 (PDF) Customer Letters Tonopah ID-5/25/05 (PDF) APS-5/26/05 (PDF) SRP-5/27/05 (PDF) RSLynch-6/1/05 (PDF) KRSaline-6/1/05 (PDF) Formal Process Federal Register Notice (Word) Federal Register Notice (PDF) Brochure (Word) Appendices to Brochure: A B C D E1 E2 F1 F2 GH Public Information Forum July 14, 2004 Customer Meeting Overview (Power Point)

279

Upper Great Plains Rates information  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates and Repayment Services Rates and Repayment Services Rates 2010 Firm Power Rate (effective January 1, 2010) Rate Adjustments 2010 Firm Power Rate Adjustment 2009 Firm Power Rate Adjustment IS Rate Adjustments Rate Adjustment Process Rate Orders Signed, December 23, 2009 (16kb pdf) Announcements Firm Electric Service Customer Letter - Preliminary Review of Drought Adder Component, June 27, 2013 (74kb pdf) Customer Letter - Final Notice of Drought Adder Component, October 2, 2013 (68kb pdf) Integrated System (IS) Rates 2014 IS Rates Customer Information Meeting Presentation, October 15, 2013 (611kb pdf) Customer Letter - Notification of 2014 Rates, September 13, 2013 (160kb pdf) 2014 Transmission and Ancillary Services Rate Calculation and 2012 Rate True-up Calculation (4.9mb pdf) 2013 IS Rates

280

Natural Gas Conveyance and Rates  

Reports and Publications (EIA)

Natural gas transportation market; Competition vs. market power; Rate structures Cost-of-service Performance based rates

Information Center

2001-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

282

The impact of retail rate structures on the economics of commercial photovoltaic systems in California  

E-Print Network (OSTI)

retail electricity rates currently offered in the state.electricity rates currently offered by the five largest electric utilities in the state:electricity tariffs. Rate Design for Commercial Customers in the United States

Mills, Andrew D.

2009-01-01T23:59:59.000Z

283

The Impact of Retail Rate Structures on the Economics of Commercial Photovoltaic Systems in California  

E-Print Network (OSTI)

retail electricity rates currently offered in the state.electricity rates currently offered by the five largest electric utilities in the state:electricity tariffs. Rate Design for Commercial Customers in the United States

Mills, Andrew

2009-01-01T23:59:59.000Z

284

NETL F 451.1-1/1 Categorical Exclusion (CX) Designation Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Matthew Peck FE NA Site Operations Division 2011 Matthew Peck 712011 to 712012 NETL: Pittsburgh, PA NETL Pittsburgh - Replace 25kV Air Switch 920 Area Replace existing 25kV...

285

Engitectural Design  

E-Print Network (OSTI)

Traditionally, Architecture and Engineering have been disciplines practiced exclusive of one another's input and collaboration. This seemingly awkward custom is due in part to tradition and to the two distinct perspectives each discipline has concerning the function of a building and it's many components. In the past, collaboration on a project generally occurred out of necessity, and can usually be attributed to a system and design integration problems. In most instances, these issues are related to the mechanical systems of building, and in a hot and humid climate the issues are magnified. Therefore, this paper will discuss the concepts and merits of a new design process called: Engitectural Design. Engitectural Design is the concept of blending the many design and aesthetic concerns of architecture with the more technical aspects of engineering, especially in the area of mechanical HVAC systems. The use of this new design procedure will reduce, if not eliminate, current problems with clearances, mechanical room size and optimal area selection. Merely incorporating the mechanical needs of a building during the schematic phase will reduce communication problems that cause the above mentioned problems, and thus optimize the system. This paper will address the mutual concerns of both professions as it pertains to materials, lighting, surface finishes, passive and active solar and the use of landscaping, focusing on the benefits of mutual agreement in a hot and humid climate. To be successful, the collaboration must begin in pre-design and continue through project completion. During initial implementation of Engitectural Design, a fm can expect each phase of a project to take longer than usual. Lack of established relationships, poor communication and professional territorial rights will exist in the beginning. However, over time a fm can expect a time reduction due to fewer revisions and the elimination of duplicated work. As it pertains to today's more advanced HVAC systems, this new cooperation and understanding of the needs within disciplines will yield a more effective and efficient operating unit for today's hot and humid environment.

Gagliardi, D. R.

1996-01-01T23:59:59.000Z

286

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

287

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.  

SciTech Connect

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

288

Rail Coal Transportation Rates  

U.S. Energy Information Administration (EIA) Indexed Site

reports reports Coal Transportation Rates to the Electric Power Sector With Data through 2010 | Release Date: November 16, 2012 | Next Release Date: December 2013 | Correction Previous editions Year: 2011 2004 Go Figure 1. Deliveries from major coal basins to electric power plants by rail, 2010 Background In this latest release of Coal Transportation Rates to the Electric Power Sector, the U.S. Energy Information Administration (EIA) significantly expands upon prior versions of this report with the incorporation of new EIA survey data. Figure 1. Percent of total U.S. rail shipments represented in data figure data Previously, EIA relied solely on data from the U.S. Surface Transportation Board (STB), specifically their confidential Carload Waybill Sample. While valuable, due to the statistical nature of the Waybill data,

289

Plant Tumor Growth Rates  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant Tumor Growth Rates Plant Tumor Growth Rates Name: Gina and Maria Location: N/A Country: N/A Date: N/A Question: We are doing a science fair project on if B. Carotene, Green tea, and Grape Seed Extract helps plants against the crown gall disease. We injected sunflowers with agrobacterium tum. one week ago (Sun. Feb. 27, 2000). Our questions is how long will it take for the tumors to grow? We scratched the surface of the stems and injected the agrobacterium in the wound. Also which do you think, in your opinion, will do the best, if any? Our science fair is April 13, do you think we'll have growth before then, atleast enough time to do our conclusion and results? Thank you, any information you forward will be very helpful. Replies: Sunflowers form galls relatively quickly. I usually get them in two weeks at least. Good luck.

290

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% 4,100 4,400 4,700 5,000 5,300 5,600 5,900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Distillate Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: 2.5% Aug '12 to Aug '13: -1.3% YTD '12 to YTD '13: 1.5% 300 400 500 600 700 800 900 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons U.S. Residual Fuel Sales 2011 2012 2013 Adjusted Growth Rates* Jul '13 to Aug '13: -0.8%

291

Adjusted Growth Rates* Jan.  

U.S. Energy Information Administration (EIA) Indexed Site

Adjusted Adjusted Growth Rates* Jan. '99 to Feb. '99: -1.7% Feb. '98 to Feb. '99: +19.8% YTD '98 to YTD '99: +15.0% U.S. Distillate Fuel Sales 3,000 3,500 4,000 4,500 5,000 5,500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -7.4% Jan '99 to Jan '00: -0.1% YTD '99 to YTD '00: -0.1% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -16.8% Jan '99 to Jan '00: -3.2% YTD '99 to YTD '00: -3.2% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1998 1999 2000 Adjusted Growth Rates* Dec '99 to Jan '00: -9.3% Jan '99 to Jan '00: +3.5% YTD '99 to YTD '00: +3.5% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul

292

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Nov '99 to Dec '99: +5.3% Nov '99 to Dec '99: +5.3% Dec '98 to Dec '99: +8.7% YTD '98 to YTD '99: +5.0% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +6.0% Dec '98 to Dec '99: +4.5% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +2.4% Dec '98 to Dec '99: +3.0% YTD '98 to YTD '99: +0.9% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Nov '99 to Dec '99: +32.3% Dec '98 to Dec '99: +2.0% YTD '98 to YTD '99: +5.5%

293

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

July '99 to Aug. '99: +4.7% July '99 to Aug. '99: +4.7% Aug. '98 to Aug. '99: +1.3% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -1.9% Aug. '98 to Aug. '99: -0.4% YTD '98 to YTD '99: +0.9% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: -0.1% Aug. '98 to Aug. '99: -1.4% YTD '98 to YTD '99: -0.7% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* July '99 to Aug. '99: +22.3% Aug. '98 to Aug. '99: +21.1%

294

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Aug '99 to Sep '99: +4.9% Aug '99 to Sep '99: +4.9% Sep '98 to Sep '99: +4.7% YTD '98 to YTD '99: +4.7% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.4% Sep '98 to Sep '99: +0.4% YTD '98 to YTD '99: +1.3% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: -2.1% Sep '98 to Sep '99: +4.6% YTD '98 to YTD '99: 0.0% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Aug '99 to Sep '99: +7.3% Sep '98 to Sep '99: +8.4% YTD '98 to YTD '99: +8.3%

295

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Oct '99 to Nov '99: +0.1% Oct '99 to Nov '99: +0.1% Nov '98 to Nov '99: +5.5% YTD '98 to YTD '99: +4.5% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: -0.7% Nov '98 to Nov '99: +1.7% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +2.5% Nov '98 to Nov '99: +6.0% YTD '98 to YTD '99: +0.8% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Oct '99 to Nov '99: +9.7% Nov '98 to Nov '99: +2.2% YTD '98 to YTD '99: +6.2%

296

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

June '99 to July '99: -5.4% June '99 to July '99: -5.4% July '98 to July '99: +3.3% YTD '98 to YTD '99: +6.3% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: -0.5% July '98 to July '99: -0.4% YTD '98 to YTD '99: +1.1% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +0.5% July '98 to July '99: +1.0% YTD '98 to YTD '99: -0.3% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* June '99 to July '99: +1.5% July '98 to July '99: +10.2% YTD '98 to YTD '99: +7.2%

297

Adjusted Growth Rates*  

U.S. Energy Information Administration (EIA) Indexed Site

Sep '99 to Oct '99: +3.9% Sep '99 to Oct '99: +3.9% Oct '98 to Oct '99: +2.3% YTD '98 to YTD '99: +4.4% U.S. Motor Gasoline Sales 8,000 9,000 10,000 11,000 12,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -0.2% Oct '98 to Oct '99: -0.9% YTD '98 to YTD '99: +1.0% U.S. Kerosene-Type Jet Fuel Sales 1,500 1,600 1,700 1,800 1,900 2,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -1.9% Oct '98 to Oct '99: -0.7% YTD '98 to YTD '99: +0.4% U.S. Propane Sales 600 800 1,000 1,200 1,400 1,600 1,800 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Millions of Gallons 1997 1998 1999 Adjusted Growth Rates* Sep '99 to Oct '99: -2.1% Oct '98 to Oct '99: -6.4% YTD '98 to YTD '99: +6.6%

298

Commercial Building Energy Asset Rating Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BUILDING BUILDING ENERGY ASSET RATING WORKSHOP December 8-9, 2011 Washington, D.C. Nora Wang (Pacific Northwest National Laboratory) Will Gorrissen (Pacific Northwest National Laboratory) Molly McCabe (Hayden Tanner, LLC) Cody Taylor (Department of Energy) 1 I Asset Rating D.C. Workshop eere.energy.gov PRE-DECISIONAL Information included in this document is for discussion purposes and does not constitute the final program design. FOR INFORMATION ONLY 2 I Asset Rating D.C. Workshop eere.energy.gov Program Goals * Facilitate cost-effective investment in energy efficiency and reduce energy use in the commercial building sector * Establish a national standard for voluntary commercial building asset rating * Create a tool to help building owners identify and implement

299

Rate Adjustments and Public Involvement  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Adjustments and Public Involvement Documents Rate Adjustments and Public Involvement Documents CRSP Transmission 9/16/2013 WAPA-161 FRN, CRSP transmission and ancillary services rates extension Letter announcing two-year extension to CRSP transmission and ancillary services rates Letter announcing revised CRSP transmission rates for FY 2014 Accompanying calculation table for FY 2014 CRSP transmission rate letter Letter announcing revised CRSP transmission rates for FY 2013 Letter announcing revised CRSP transmission rates for FY 2012 Letter announcing revised CRSP transmission rates for FY 2011 Letter announcing revised CRSP transmission rates for FY 2010 SLCA/IP 9/16/2013 WAPA-161 FRN, SLCA/IP firm power rate extension Letter announcing two-year extension to SLCA/IP firm power rate SLCA/IP Tentative Rate Adjustment Schedule

300

Lighting Design | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design Lighting Design July 29, 2012 - 6:28pm Addthis Energy-efficient indoor and outdoor lighting design focuses on ways to improve both the quality and efficiency of lighting. | Photo courtesy of ©iStockphoto.com/chandlerphoto. Energy-efficient indoor and outdoor lighting design focuses on ways to improve both the quality and efficiency of lighting. | Photo courtesy of ©iStockphoto.com/chandlerphoto. How does it work? Buy ENERGY STAR-rated lighting for the highest quality, energy-efficient lighting. Use timers and other controls to turn lights on and off. Use outdoor solar lighting. Energy-efficient indoor and outdoor lighting design focuses on ways to improve both the quality and efficiency of lighting. If you're constructing a new house, consider lighting as part of your whole-house design -- an

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

PULSE RATE DIVIDER  

DOE Patents (OSTI)

A compact pulse-rate divider circuit affording low impedance output and high input pulse repetition rates is described. The circuit features a single secondary emission tube having a capacitor interposed between its dynode and its control grid. An output pulse is produced at the anode of the tube each time an incoming pulse at the control grid drives the tube above cutoff and the duration of each output pulse corresponds to the charging time of the capacitor. Pulses incoming during the time the grid bias established by the discharging capacitor is sufficiently negative that the pulses are unable to drive the tube above cutoff do not produce output pulses at the anode; these pulses are lost and a dividing action is thus produced by the circuit. The time constant of the discharge path may be vanied to vary in turn the division ratio of the circuit; the time constant of the charging circuit may be varied to vary the width of the output pulses. (AEC)

McDonald, H.C. Jr.

1962-12-18T23:59:59.000Z

302

Space design  

Science Conference Proceedings (OSTI)

Space stations, Moon bases and Mars bases are artificial habitats intended to support human life in extreme conditions. Their purpose is to pursue human progress and to gain knowledge and experience of the environment surrounding our planet. This research ... Keywords: Human factors, Interior design, Space habitability, Sustainability, Vision

Irene Lia Schlacht; Henrik Birke

2011-06-01T23:59:59.000Z

303

Conceptual design for a linear-transformer driver (LTD)-based refurbishment and upgrade of the Saturn accelerator pulse-power system.  

Science Conference Proceedings (OSTI)

The purpose of this work was to develop a conceptual design for the Saturn accelerator using the modular Liner-Transformer Driver (LTD) technology to identify risks and to focus development and research for this new technology. We present a reference design for a Saturn class driver based on a number of linear inductive voltage adders connected in parallel. This design is very similar to a design reported five years ago [1]. However, with the design reported here we use 1-MA, 100-kV LTD cavities as building blocks. These cavities have already been built and are currently in operation at the HCEI in Tomsk, Russia [2]. Therefore, this new design integrates already-proven individual components into a full system design.

Mazarakis, Michael Gerrassimos; Struve, Kenneth William

2006-09-01T23:59:59.000Z

304

Survey of innovative rates, 1991  

SciTech Connect

Current innovative rate data from 135 major utilities throughout the United States were gathered and analyzed. Over 1000 innovative rates that were in use by the utilities in 1990 and 1991 were identified, abstracted and entered into a database. Survey results indicate that over 616 million MWh were sold to the nearly five million customers using the innovative rates offered. From an annual sales perspective, the most widely used rates are demand-side management rates -- rates intended to change customer energy use -- and rates that are market-driven.'' The survey identified 525 demand-side management rates serving our four million customers with reported sales of approximately 520 million MWh. These rates serve over 80% of the total innovative rate customers and account for 84% of the total MWh sales. Also important in terms of MWh sales they represent are market-driven rates, which accounted for sales of 48 million MWh in 1990. Both demand-side management and market-driven rates show a 20% customer growth rate between 1988 and 1990. Other innovative rates examined in the survey included: prepaid service; load retention incentive rates; technology specific rates; and those rates related expressly to non-utility generators -- namely buy-back and standby rates.

White, L.J.; Wakefield, R.A.; McVicker, C.M.

1992-04-01T23:59:59.000Z

305

Survey of innovative rates, 1991  

Science Conference Proceedings (OSTI)

Current innovative rate data from 135 major utilities throughout the United States were gathered and analyzed. Over 1000 innovative rates that were in use by the utilities in 1990 and 1991 were identified, abstracted and entered into a database. Survey results indicate that over 616 million MWh were sold to the nearly five million customers using the innovative rates offered. From an annual sales perspective, the most widely used rates are demand-side management rates -- rates intended to change customer energy use -- and rates that are market-driven.'' The survey identified 525 demand-side management rates serving our four million customers with reported sales of approximately 520 million MWh. These rates serve over 80% of the total innovative rate customers and account for 84% of the total MWh sales. Also important in terms of the MWh sales they represent are market-driven rates, which accounted for sales of 48 million MWh in 1990. Both demand-side management and market-driven rates show a 20% customer growth rate between 1988 and 1990. Other innovative rates examined in the survey included: prepaid service; load retention incentive rates; technology specific rates; and those rates related expressly to non-utility generators -- namely buy-back and standby rates.

White, L.J.; Wakefield, R.A.; McVicker, C.M.

1992-04-01T23:59:59.000Z

306

Design of the fundamental power coupler and photocathode inserts for the 112MHz superconducting electron gun  

Science Conference Proceedings (OSTI)

A 112 MHz superconducting quarter-wave resonator electron gun will be used as the injector of the Coherent Electron Cooling (CEC) proof-of-principle experiment at BNL. Furthermore, this electron gun can be the testing cavity for various photocathodes. In this paper, we present the design of the cathode stalks and a Fundamental Power Coupler (FPC) designated to the future experiments. Two types of cathode stalks are discussed. Special shape of the stalk is applied in order to minimize the RF power loss. The location of cathode plane is also optimized to enable the extraction of low emittance beam. The coaxial waveguide structure FPC has the properties of tunable coupling factor and small interference to the electron beam output. The optimization of the coupling factor and the location of the FPC are discussed in detail. Based on the transmission line theory, we designed a half wavelength cathode stalk which significantly brings down the voltage drop between the cavity and the stalk from more than 5.6 kV to 0.1 kV. The transverse field distribution on cathode has been optimized by carefully choosing the position of cathode stalk inside the cavity. Moreover, in order to decrease the RF power loss, a variable diameter design of cathode stalk has been applied. Compared to the uniform shape of stalk, this design gives us much smaller power losses in important locations. Besides that, we also proposed a fundamental power coupler based on the designed beam parameters for the future proof-of-principle CEC experiment. This FPC should give a strong enough coupling which has the Q external range from 1.5e7 to 2.6e8.

Xin, T.; Ben-Zvi, I.; Belomestnykh, S.; Chang, X.; Rao, T.; Skaritka, J.; Wu, Q.; Wang, E.; Liang, X.

2011-07-25T23:59:59.000Z

307

Optimization of time-based rates in forward energy markets  

E-Print Network (OSTI)

This paper presents a new two-step design approach of Time-Based Rate (TBR) programs for markets with a high penetration of variable energy sources such as wind power. First, an optimal market time horizon must be determined ...

Wang, J.

308

Participatory design: the will to succeed  

Science Conference Proceedings (OSTI)

The paper reviews some aspects of the procurement and development of large scale systems and finds that there is still a high failure rate, which is especially visible in the public sector. It argues that the Participatory Design (PD) perspective offers ... Keywords: commercialisation, ethnography in design, large-scale information systems, participatory design, politics of information systems, public sector information systems

Dan Shapiro

2005-08-01T23:59:59.000Z

309

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

310

Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

311

Radiation Leukemogenesis at Low Dose Rates  

SciTech Connect

The major goals of this program were to study the efficacy of low dose rate radiation exposures for the induction of acute myeloid leukemia (AML) and to characterize the leukemias that are caused by radiation exposures at low dose rate. An irradiator facility was designed and constructed that allows large numbers of mice to be irradiated at low dose rates for protracted periods (up to their life span). To the best of our knowledge this facility is unique in the US and it was subsequently used to study radioprotectors being developed for radiological defense (PLoS One. 7(3), e33044, 2012) and is currently being used to study the role of genetic background in susceptibility to radiation-induced lung cancer. One result of the irradiation was expected; low dose rate exposures are ineffective in inducing AML. However, another result was completely unexpected; the irradiated mice had a very high incidence of hepatocellular carcinoma (HCC), approximately 50%. It was unexpected because acute exposures are ineffective in increasing HCC incidence above background. This is a potential important finding for setting exposure limits because it supports the concept of an ?inverse dose rate effect? for some tumor types. That is, for the development of some tumor types low dose rate exposures carry greater risks than acute exposures.

Weil, Michael; Ullrich, Robert

2013-09-25T23:59:59.000Z

312

Event loss rates and readout chips  

E-Print Network (OSTI)

98-57 The LHCb experiment aims at a deadtimeless readout of B­events at a primary bunch crossing rate of 40 MHz. In order to achieve this goal, information from all events must be stored in a pipeline with latency matched to the time needed for the Level 0 trigger decision. Accepted events, which constitute only a small fraction of the total sample, are stored in a fifo of a certain depth and read out with a fixed clock rate. The fifo, also referred to as multi­event or derandomizing buffer, is needed in order to even out statistical fluctuations in the trigger rate. Apart from the length of the pipeline, which determines the maximum latency of the chip, the crucial parameter characterizing a readout chip is the fraction of triggers lost due to limitations of the chip's architecture. This note describes how the different design parameters and operation conditions determine the chip's performance.

Schmelling, M

1998-01-01T23:59:59.000Z

313

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.  

SciTech Connect

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

2008-03-03T23:59:59.000Z

314

Mechanical Design  

SciTech Connect

The particle beam of the SXR (soft x-ray) beam line in the LCLS (Linac Coherent Light Source) has a high intensity in order to penetrate through samples at the atomic level. However, the intensity is so high that many experiments fail because of severe damage. To correct this issue, attenuators are put into the beam line to reduce this intensity to a level suitable for experimentation. Attenuation is defined as 'the gradual loss in intensity of any flux through a medium' by [1]. It is found that Beryllium and Boron Carbide can survive the intensity of the beam. At very thin films, both of these materials work very well as filters for reducing the beam intensity. Using a total of 12 filters, the first 9 being made of Beryllium and the rest made of Boron Carbide, the beam's energy range of photons can be attenuated between 800 eV and 9000 eV. The design of the filters allows attenuation for different beam intensities so that experiments can obtain different intensities from the beam if desired. The step of attenuation varies, but is relative to the thickness of the filter as a power function of 2. A relationship for this is f(n) = x{sub 0}2{sup n} where n is the step of attenuation desired and x{sub 0} is the initial thickness of the material. To allow for this desired variation, a mechanism must be designed within the test chamber. This is visualized using a 3D computer aided design modeling tool known as Solid Edge.

2010-08-25T23:59:59.000Z

315

Foolproof completions for high rate production wells  

E-Print Network (OSTI)

Operators, especially those managing production from deepwater reservoirs, are striving to produce hydrocarbons at higher and higher rates without exposing the wells to completion failure risk. To avoid screen failures, recent studies have favored gravel pack (GP) and high rate water pack (HRWP) completions over high-permeability fracturing (HPF), known in the vernacular as a frac&pack (FP) for very high rate wells. While a properly designed GP completion may prevent sand production, it does not stop formation fines migration, and, over time, fines accumulation in the GP will lead to increasing completion skin. Although, and not always, the skin can be removed by acidizing, it is not practical to perform repeated acid treatments on deepwater wells, particularly those with subsea wellheads, and the alternative has been to subject the completion to increasingly high drawdown, accepting a high skin effect. A far better solution is to use a HPF completion. Of course the execution of a successful HPF is not a trivial exercise, and frequently, there is a steep learning curve for such a practice. This work explains the importance to HPF completions of the well trajectory through the interval to be hydraulically fractured, for production, not execution, reasons. A new model quantifies the effect of the well inclination on the connectivity between the fracture and the well via perforations. Guidelines based on the maximum target production rate, including forecasts of multiphase flow, are provided to size the HPF completion to avoid common completion failures that may result from high fluid rate and/or fines movement. Skin model will be developed for both vertical and deviated wells. Once the HPF is properly designed and executed, the operators should end up with a long term low skin good completion quality well. The well will be safely produced at the maximum flow rates, with no need for well surveillance and monitoring.

Tosic, Slavko

2007-12-01T23:59:59.000Z

316

PSNC Energy (Gas) - Green Building Rate Discount | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PSNC Energy (Gas) - Green Building Rate Discount PSNC Energy (Gas) - Green Building Rate Discount PSNC Energy (Gas) - Green Building Rate Discount < Back Eligibility Commercial Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Heating Wind Program Info State North Carolina Program Type Utility Rate Discount Rebate Amount $0.05 discount/therm Provider PSNC Energy This discounted rate is available to commercial customers whose building meets the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) certification or equivalent. To qualify, the customer must be on the Rate 125. Qualifying customers pay $.05 per therm

317

Electric rate structures for thermal energy storage evaluation  

DOE Green Energy (OSTI)

Future electric rate structures are critical to thermal energy storage (TES) technologies that are specifically designed to take advantage of electric energy costs that vary depending on the magnitude, duration, and timing of power demand (e.g., cool storage). In fact, rate structure characteristics may affect the TES system design and operating approach as well as economic feasibility. The objective of this study, conducted by the Pacific Northwest Laboratory for the US Department of Energy, was to define reference electric utility rate structures to be used in technical assessments of TES technologies. Electric rate structures were characterized for residential, commercial and industrial sectors. A range of conditions for several alternative rate structures was identified for each sector to capture the variability of likely conditions. Individual rate structure characteristics include demand charges and energy charges applicable during different months of the year, days of the week, and hours of the day. 7 refs., 21 tabs.

Brown, D R; Garrett, S M; Sedgewick, J M

1991-05-01T23:59:59.000Z

318

electric rates | OpenEI  

Open Energy Info (EERE)

electric rates electric rates Dataset Summary Description This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011. Source NREL and Ventyx Date Released February 24th, 2012 (2 years ago) Date Updated Unknown Keywords electric rates rates US utilities Data text/csv icon IOU rates by zipcode (csv, 1.7 MiB) text/csv icon Non-IOU rates by zipcode (csv, 2.1 MiB)

319

DWPF Macrobatch 2 Melt Rate Tests  

SciTech Connect

The Defense Waste Processing Facility (DWPF) canister production rate must be increased to meet canister production goals. Although a number of factors exist that could potentially increase melt rate, this study focused on two: (1) changes in frit composition and (2) changes to the feed preparation process to alter the redox of the melter feed. These two factors were investigated for Macrobatch 2 (sludge batch 1B) utilizing crucible studies and a specially designed ''melt rate'' furnace. Other potential factors that could increase melt rate include: mechanical mixing via stirring or the use of bubblers, changing the power skewing to redistribute the power input to the melter, and elimination of heat loss (e.g. air in leakage). The melt rate testing in FY00 demonstrated that melt rate can be improved by adding a different frit or producing a much more reducing glass by the addition of sugar as a reductant. The frit that melted the fastest in the melt rate testing was Frit 165. A paper stud y was performed using the Product Composition Control System (PCCS) to determine the impact on predicted glass viscosity, liquidus, durability, and operating window if the frit was changed from Frit 200 to Frit 165. PCCS indicated that the window was very similar for both frits. In addition, the predicted viscosity of the frit 165 glass was 46 poise versus 84 poise for the Frit 200 glass. As a result, a change from Frit 200 to Frit 165 is expected to increase the melt rate in DWPF without decreasing waste loading.

Stone, M.E.

2001-01-03T23:59:59.000Z

320

Heart Rate Variability (HRV) in Ambient Magnetic Fields  

Science Conference Proceedings (OSTI)

In a healthy individual, the rate at which the heart beats exhibits continuous variability. In prior research at Midwest Research Institute (MRI), exposure to intermittent, but not continuous, magnetic fields was associated with alterations in heart rate variability (HRV). This report describes additional studies specifically designed to address the potential effects of magnetic field exposure on HRV.

1998-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Building Energy Software Tools Directory: REM/Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

REM/Rate REM/Rate REM/Rate logo. User-friendly, yet highly sophisticated, residential energy analysis, code compliance and rating software developed specifically for the needs of HERS providers. REM/Rate calculates heating, cooling, hot water, lighting, and appliance energy loads, consumption and costs for new and existing single and multi-family homes. Climate data is available for cities and towns throughout North America. A home energy rating is calculated based on the proposed DOE HERS guidelines (10 CFR 437) as modified by the RESNET/NASEO HERS Technical Committee. In addition to an energy rating, REM/Rate creates value added information including energy efficiency mortgage report, energy appraisal addendum, energy code compliance (MEC, IECC, and ASHRAE), improvement analysis (existing homes), design optimization (new homes),

322

National Utility Rate Database: Preprint  

DOE Green Energy (OSTI)

When modeling solar energy technologies and other distributed energy systems, using high-quality expansive electricity rates is essential. The National Renewable Energy Laboratory (NREL) developed a utility rate platform for entering, storing, updating, and accessing a large collection of utility rates from around the United States. This utility rate platform lives on the Open Energy Information (OpenEI) website, OpenEI.org, allowing the data to be programmatically accessed from a web browser, using an application programming interface (API). The semantic-based utility rate platform currently has record of 1,885 utility rates and covers over 85% of the electricity consumption in the United States.

Ong, S.; McKeel, R.

2012-08-01T23:59:59.000Z

323

Design and construction of the SMUDPV1 1-MW photovoltaic power plant. Final report I  

Science Conference Proceedings (OSTI)

The Sacramento Municipal Utility District (SMUD), with cofunding from the US Department of Energy (DOE) and the California State Energy Resources Conservation and Development Commission (CEC), designed, procured, installed, and initiated operation of a nominal 1000 kilowatt power generating facility. The facility converts solar energy directly into electricity using flat plate photovoltaic modules which are mounted on modular single-axis tracking structures. The facility is located adjacent to the Rancho Seco Nuclear Generating Station, southeast of Sacramento, California. Design work began in 1982 and the plant began operation in August 1984. Direct current power from the 112 identical tracking structures is converted to 12.5-kV alternating current power by solid state power conditioning equipment. Overall conversion efficiency, sunlight to utility grid power, is between 8 and 10%. The plant is expected to generate 2.6 million kWh annually. The capital cost of the plant was $12.14 million.

Wool, M.R.; Rosen, D.J.

1985-04-01T23:59:59.000Z

324

Operational dose rate visualization techniques  

SciTech Connect

The analysis of the gamma ray dose rate in the vicinity of a radiation source can be greatly aided by the use of recent state-of-the-art visualization techniques. The method involves calculating dose rates at thousands of locations within a complex geometry system. This information is then processed to create contour plots of the dose rate. Additionally, when these contour plots are created, animations can be created that dynamically display the dose rate as the shields or sources are moved.

Schwarz, R.A.; Morford, R.J.; Carter, L.L.; Jones, G.B.; Greenborg, J.

1994-01-01T23:59:59.000Z

325

DOE Guidance-Category Rating  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum is to establish the Department of Energy's (DOE's) policy for the use of Category Rating.

326

ARCS – Access Rate Control System  

protected steel housing. ... Access Rate Control System This rugged, maintenance- ... Y-12 is seeking an industry partner to fully com-

327

Single chamber fuel cells: Flow geometry, rate and composition considerations  

DOE Green Energy (OSTI)

Four different single chamber fuel cell designs were compared using propane-air gas mixtures. Gas flow around the electrodes has a significant influence on the open circuit voltage and the power density of the cell. The strong influence of flow geometry is likely due to its effect on gas composition, particularly on the oxygen chemical potential at the two electrodes as a result of gas mixing. The chamber design which exposes the cathode first to the inlet gas was found to yield the best performance at lower flow rates, while the open tube design with the electrodes equally exposed to the inlet gas worked best at higher flow rates.

Stefan, Ionel C.; Jacobson, Craig P.; Visco, Steven J.; De Jonghe, Lutgard C.

2003-11-17T23:59:59.000Z

328

The 12 kV, 50 kA Pulse Generator for the SPS MKDH Horizontal Beam Dump Kicker System,equipped with Semiconductor Switches  

E-Print Network (OSTI)

The high current pulses for the MKDH magnets are generated with capacitor discharge type generators which, combined with a resistive free-wheel diode circuit, deliver a critically damped half-sine current with a rise-time of 25 ms. Each generator consists of two 25 kA units, connected in parallel to a magnet via low inductance transmission lines. They are equipped with a stack of four Fast High Current Thyristors, together with snubber capacitors, a voltage divider and a specially designed trigger transformer.

Bonthond, J; Faure, P; Vossenberg, Eugène B; CERN. Geneva. SPS and LHC Division

2001-01-01T23:59:59.000Z

329

Commercial Cool Storage Design Guide  

Science Conference Proceedings (OSTI)

This state-of-the-art handbook provides comprehensive guidance for designing ice and chilled-water storage systems for commercial buildings. HVAC engineers can take advantage of attractive rates and incentives offered by utilities to increase the market for cool storage systems.

1985-05-01T23:59:59.000Z

330

Design Scenarios: Enabling transparent parametric design spaces  

Science Conference Proceedings (OSTI)

This paper presents a novel methodology called Design Scenarios (DSs) intended for use in conceptual design of buildings. DS enables multidisciplinary design teams to streamline the requirements definition, alternative generation, analysis, and decision-making ... Keywords: Conceptual design, Design spaces, Ontology, Parametric modeling, Process mapping, Requirements modeling

Victor Gane; John Haymaker

2012-08-01T23:59:59.000Z

331

Asymptotic Cellular Growth Rate as the Effective Information Utilization Rate  

E-Print Network (OSTI)

We study the average asymptotic growth rate of cells in randomly fluctuating environments. Using a game-theoretic perspective, we show that any response strategy has an asymptotic growth rate, which is the sum of: (i) the maximal growth rate at the worst possible distribution of environments, (ii) relative information between the actual distribution of environments to the worst one, and (iii) information utilization rate which is the information rate of the sensory devices minus the "information dissipation rate", the amount of information not utilized by the cell for growth. In non-stationary environments, the optimal strategy is the time average of the instantaneous optimal strategy and the optimal switching times are evenly spaced in the statistical (Fisher) metric.

Pugatch, Rami; Tlusty, Tsvi

2013-01-01T23:59:59.000Z

332

Impacts of Lapse Rates on Low-Level Rotation in Idealized Storms  

Science Conference Proceedings (OSTI)

Adiabatic lapse rates appear to be a common feature in the lower troposphere on tornado days. This article reviews physical reasons why lapse rates may influence surface vortex intensification and reports on numerical simulations designed to study ...

Matthew D. Parker

2012-02-01T23:59:59.000Z

333

Benchmarking and Performance Based Rating System for Commercial Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Benchmarking and Performance Based Rating System for Commercial Buildings Benchmarking and Performance Based Rating System for Commercial Buildings in India Speaker(s): Saket Sarraf Date: May 4, 2012 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Girish Ghatikar The Indian building sector has witnessed huge surge in interest in energy performance in the last decade. The 'intention' based codes like the national Energy Conservation Building Code (ECBC) and green building rating systems such as Leadership in Energy and Environment Design (LEED-India) and Green Rating for Integrated Habitat Assessment (GRIHA) have been the prime mechanisms to design and assess energy efficient buildings. However, they do not rate the 'achieved' energy performance of buildings over time or reward their performance through a continuous evaluation process.

334

Photovoltaic Incentive Design Handbook  

DOE Green Energy (OSTI)

Investments in customer-owned grid-connected photovoltaic (PV) energy systems are growing at a steady pace. This is due, in part, to the availability of attractive economic incentives offered by public state agencies and utilities. In the United States, these incentives have largely been upfront lump payments tied to the system capacity rating. While capacity-based ''buydowns'' have stimulated the domestic PV market, they have been criticized for subsidizing systems with potentially poor energy performance. As a result, the industry has been forced to consider alternative incentive structures, particularly ones that pay based on long-term measured performance. The industry, however, lacks consensus in the debate over the tradeoffs between upfront incentive payments versus longer-term payments for energy delivery. This handbook is designed for agencies and utilities that offer or intend to offer incentive programs for customer-owned PV systems. Its purpose is to help select, design, and implement incentive programs that best meet programmatic goals. The handbook begins with a discussion of the various available incentive structures and then provides qualitative and quantitative tools necessary to design the most appropriate incentive structure. It concludes with program administration considerations.

Hoff, T. E.

2006-12-01T23:59:59.000Z

335

The impact of retail rate structures on the economics of commercial photovoltaic systems in California  

E-Print Network (OSTI)

How Effective State Net Metering Laws Can Revolutionalizebe of importance. The value of net metering is found to beRetail rate design, Net metering Introduction The solar

Mills, Andrew D.

2009-01-01T23:59:59.000Z

336

Revegetation of an Acid Mine Drainage - Impacted Soil Using Low Rates of Lime and Compost.  

E-Print Network (OSTI)

??AbstractA study was designed to determine whether a degraded soil overlain by acid mine drainage (AMD) precipitates could be remediated with low rates of lime… (more)

Lupton, Mary Kay

2008-01-01T23:59:59.000Z

337

Sustainable Building Rating Systems Summary  

SciTech Connect

The purpose of this document is to offer information that could be used to compare and contrast sustainable building rating systems.

Fowler, Kimberly M.; Rauch, Emily M.

2006-07-01T23:59:59.000Z

338

Search Results for 'Credit Rating'  

U.S. Energy Information Administration (EIA)

The rating agency says it expects the bank’s asset quality to remain weak over the next 12-18 months

339

June 1 Government Rate $137  

NLE Websites -- All DOE Office Websites (Extended Search)

& Fitness Center The Jewelry Box & Gift Shoppe 24 Hour Front Desk Service, Sundry Shop, ATM Wireless Internet Always Complimentary 112 per night room rate effective thru April...

340

Exchange rate determination in Indonesia.  

E-Print Network (OSTI)

??This thesis examines the options for adopting normative and prescriptive models of exchange rate determination suitable for developed and developing countries. It also develops a… (more)

Rusydi, Mohammad

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Definition: Rating | Open Energy Information  

Open Energy Info (EERE)

power, such as transformers, or transport it from one location to another, such as transmission lines, the power rating almost always refers to the maximum power flow...

342

Tutorial Design Windows - CECM  

E-Print Network (OSTI)

Tutorial Design Windows: Activity 2: Activity 2 Design Window Return to tutorial. Exercise 1: Exercise 1 Design Window Return to exercises. Exercise 2: Exercise  ...

343

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

344

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

345

Server efficiency rating tool (SERT)  

Science Conference Proceedings (OSTI)

The Server Efficiency Rating Tool (SERT) [1] has been developed by Standard Performance Evaluation Corporation (SPEC) [2] at the request of the US Environmental Protection Agency (EPA) [3], prompted by concerns that US datacenters consumed almost 3% ... Keywords: benchmark, datacenter, energy efficiency, energy star, environmental protection agency, epa, power, rating tool, sert, server, spec

Klaus-Dieter Lange; Mike G. Tricker; Jeremy A. Arnold; Hansfried Block; Sanjay Sharma

2012-04-01T23:59:59.000Z

346

An omni-directional design tool for series hybrid electric vehicle design  

E-Print Network (OSTI)

System level parametric design of hybrid electric vehicles involves estimation of the power ratings as well as the values of certain parameters of the components, given the values of the performance parameters. The design is based on certain mathematical equations or ?design rules?, which relate the component parameters and the performance parameters. The flow of the design algorithm is uni-directional and fixed, and cannot be altered. This thesis proposes a new method for such parametric design, called omni- directional design, which does not have a fixed sequence like the conventional design, but can start with any parameters of the designer?s choice. The designer is also able to specify the input parameters over a range, instead of a point (one, fixed value) input. Scenarios having a point input, but values of an output which can vary over a range for the point input, can also be studied.

Shidore, Neeraj Shripad

2003-12-01T23:59:59.000Z

347

Simplicity in interaction design  

Science Conference Proceedings (OSTI)

Attaining simplicity is a key challenge in interaction design. Our approach relies on a minimalist design exercise to explore the communication capacity for interaction components. This approach results in expressive design solutions, useful perspectives ... Keywords: expressiveness, interface design, simplicity, usability

Angela Chang; James Gouldstone; Jamie Zigelbaum; Hiroshi Ishii

2007-02-01T23:59:59.000Z

348

Supernova rates and stellar populations  

E-Print Network (OSTI)

We discuss the results about the nature of type Ia Supernovae that can be derived by studying their rates in different stellar populations. While the evolution of SN photometry and spectra can constrain the explosion mechanism, the SN rate depends on the progenitor system. We review the current available data on rates as a function of parent galaxy color, morphology, star formation rate, radio luminosity and environment. By studying the variation of the rates with the color of the parent galaxy, a strong evidence was established that type Ia SNe come from both young and old stars. The dependence of the rates with the radio power of the parent galaxy is best reproduced by a bimodal distribution of delay time between the formation of the progenitor and its explosion as a SN. Cluster early-type galaxies show higher type Ia SN rate with respect to field galaxies, and this effect can be due either to traces of young stars or to differences in the delay time distribution.

F. Mannucci

2007-08-03T23:59:59.000Z

349

Empowering the Market: How Building Energy Performance Rating and  

NLE Websites -- All DOE Office Websites (Extended Search)

Empowering the Market: How Building Energy Performance Rating and Empowering the Market: How Building Energy Performance Rating and Disclosure Policies Encourage U.S. Energy Efficiency Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition

350

New Metering Enables Simplified and More Efficient Rate Structures  

Science Conference Proceedings (OSTI)

More sophisticated metering and communications technologies are now economically feasible for many more customers, allowing for rate designs that provide improved economic efficiency, transparency, simplicity and fairness, and allow customers to make efficient energy choices. Add the imperatives of the Energy Policy Act of 2005, and it may be time for utilities to assess upgrades to their metering and communications infrastructure and their rate structures.

Irastorza, Veronica

2005-12-01T23:59:59.000Z

351

TVA Contribution...How should Criteria be Applied in the Designation of NIETCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONTRIBUTION - CONTRIBUTION - PANEL 3 How Should Criteria be Applied in the Designation of NIETCs David Till TVA 1 DOE Congestion Study Technical Conference, Chicago March 29 2006 How should NIETC's be defined? 1: A solution to significant congestion which cannot be justified by conventional planning/economic criteria 2: A solution to significant congestion which can be conventionally justified, but which is not progressing NIETCs may be inter- or intra-State, inter- or intra-utility and must solve a root cause rather than a symptom 2 NIETC 1: Without conventional justification TVA's Bull Run - Volunteer 500-kV line: Adequate capacity to supply native load reliably Severe constraint to market transfers across TVA 3 10,000 MW transfer capability increase 4 Cumberland- Montgomery Paradise-

352

Design and performance of the LAMPF 1-1/4 MW klystron modulator  

SciTech Connect

From 11th modulator symposium; New York, New York, USA (18 Sep 1973). A design for a very reliable single-triode modulator for a 11/4 MW modulating-anode klystron is presented. The operating voltage is 86 kV and the variable pulse length ranges from 200 4mmsec to 1.2 msec. The basic modulator circuit, which uses a novel Zener diode bias circuit, and several of the individual components are described in detail. Over 140,000 high-voltage hours have been accumulated on these modulators. The principal failure mechanism is grid emission from the triode. These failures can be anticipated and repaired during a normal maintenance period. The triode is then reprocessed and reused. Tube life data and a summary of the failures modes are presented. (auth)

Tallerico, P.J.; Cady, R.L.; Doss, J.D.

1974-04-30T23:59:59.000Z

353

Design of a triaxial residual stress measurement system using high energy x-ray diffraction  

Science Conference Proceedings (OSTI)

Previous design studies in developing concepts for residual stress measurement in engineering materials have been extended. A pre-prototype energy dispersive x-ray diffraction (EDXRD) system has been fabricated. A 300 kV radiography source is used in conjunction with an intrinsic germanium detector and a MacII/LabVIEW data acquisition system. Specimens up to 25mm equivalent steel thickness (and one meter gross dimensions) can now be evaluated. The pre-prototype system serves as the hard x-ray, bulk stress measurement component of the previously reported hybrid stress measuring system (which would include a traditional multi-angle surface measurement system using soft x-rays). In addition, a detailed study of residual stress analytical equations has been completed and applied to various metallic and ceramic materials. During the grant period, related studies were completed on stress measurement using synchrotron radiation and on a critical review of the residual stress literature. 6 refs., 3 figs.

Shackelford, J.F.; Brown, B.D.; Park, J.S.

1989-01-01T23:59:59.000Z

354

ESBWR... An Evolutionary Reactor Design  

Science Conference Proceedings (OSTI)

GE's latest evolution of the Boiling Water Reactor, the ESBWR, combines improvements in safety with design simplification and component standardization to produce a safer, more reliable nuclear power plant, with lower projected construction costs than plants in operation today. The ESBWR program started in the early 1990's when GE was developing the Simplified Boiling Water Reactor (SBWR). GE stopped this program because the power output of the SBWR was too small to generate the right economics for a new build project. The program was a success however, because the design proved many of the passive safety technology developments that are being utilized in the ESBWR. By harnessing these design concepts and testing results from the original SBWR and construction and operating experience from the Advanced Boiling Water Reactor (ABWR), the ESBWR design team has produced a simplified reactor with a standardized design and first-rate economics. Significant simplification of plant systems is achieved in the ESBWR. As a result, operating and maintenance staff requirements are reduced; low-level waste generation is reduced; dose rates are reduced; operational reliability is improved; and plant safety and security are improved. Each of these improvements provide distinct and unique advantages to the ESBWR design. First, fewer active components (in particular, active safety systems) reduce the maintenance and online surveillance requirements, thereby reducing operational exposure and dose rates. Second, fewer demands on plant operators and safety systems reduce plant operating staff while still providing direct improvements in accident and transient response. Finally, reductions in building volumes and required manufactured components shorten the length of time needed for ESBWR construction, resulting in improved financial returns for plant owners. The ESBWR is designed to meet the needs of nuclear power plant owners today and into the future, with a 60-year design life. Through design simplification and standardization, ESBWR offers improved safety, increased reliability, and ease of operation. Yet compared to current nuclear power plants, the ESBWR requires only a fraction of traditional plant operating and maintenance staff, offers faster construction and lower costs of construction, while also reducing operational costs. (authors)

Gamble, Robert E. [GE Energy - Nuclear, 1989 Little Orchard St., San Jose, CA 95125 (United States); Hinds, David H.; Hucik, Steven A.; Maslak, Chris E. [GE Energy - Nuclear, 3901 Castle Hayne Road A-30, Wilmington, NC 28402 (United States)

2006-07-01T23:59:59.000Z

355

DOE Guidance-Category Rating  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 2010 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SARA"iJ. Boku1, DIRECToR OF HUMAN C~TAL MANAGEMENT SUBJECT: GUIDANCE MEMORANDUM #10 CATEGORY RATING The purpose of this memorandum is to establish the Department of Energy's (DOE's) policy for the use of Category Rating. Authorities: Public Law 107-296; Title 5 USC 3319; 5 CFR, Part 337, Subpart C., Presidential Memorandum of May 11, 2010 This guidance is established in accordance with 5 USC 3319, which authorizes Federal Agencies to use alternative rating proced.ures in assessing applicants for employment using category rating and selection procedures, and to ensure consistency in complying with federal regulations contained in the Code of Federal Regulations (CFR), Office of Personnel Management (OPM) and the Department of

356

ARM - Measurement - Radiative heating rate  

NLE Websites -- All DOE Office Websites (Extended Search)

govMeasurementsRadiative heating rate govMeasurementsRadiative heating rate ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Radiative heating rate The heating rate due to the divergence of long and shortwave radiative flux. Categories Radiometric, Atmospheric State Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those recorded for diagnostic or quality assurance purposes. External Instruments MOLTS : Model Output Location Time Series Datastreams MOLTS : Model Output Location Time Series Datastreams MOLTSEDASSNDCLASS1 : Model Output Loc. Time Ser. (MOLTS): EDAS

357

OpenEI - electric rates  

Open Energy Info (EERE)

U.S. Electric Utility U.S. Electric Utility Companies and Rates: Look-up by Zipcode (Feb 2011) http://en.openei.org/datasets/node/899 This dataset, compiled by NREL and Ventyx, provides average residential, commercial and industrial electricity rates by zip code for both investor owned utilities (IOU) and non-investor owned utilities. Note: the file includes average rates for each utility, but not the detailed rate structure data found in the database available via the zip-code look-up feature on the OpenEI Utilities page (http://en.openei.org/wiki/Gateway:Utilities). The data was released by NREL/Ventyx in February 2011.

358

Project Definition Rating Index (PDRI)  

Energy.gov (U.S. Department of Energy (DOE))

The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for...

359

Heat Rate Improvement Reference Manual  

Science Conference Proceedings (OSTI)

Performance optimization of fossil power plants is a high priority within the electric utilities in the new competitive environment. This manual can help utility engineers establish a heat rate improvement program.

1998-07-27T23:59:59.000Z

360

Exchange Rates, Information, and Crises  

E-Print Network (OSTI)

equation (5.4). Standard Bayesian inference implies that theAs before, standard Bayesian inference implies that Var 1 [f˜ so that standard Bayesian inference both exchange rate is

Fernholz, Ricardo Turrin

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

High compression rate text summarization  

E-Print Network (OSTI)

This thesis focuses on methods for condensing large documents into highly concise summaries, achieving compression rates on par with human writers. While the need for such summaries in the current age of information overload ...

Branavan, Satchuthananthavale Rasiah Kuhan

2008-01-01T23:59:59.000Z

362

Design requirements document for the phase 1 privatization electrical power system  

Science Conference Proceedings (OSTI)

The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

Singh, G.

1997-10-31T23:59:59.000Z

363

The Effect of Load-Line Displacement Rate on the SCC Growth Rate of Nickel Alloys and Mechanistic Implications  

DOE Green Energy (OSTI)

A key set of SCC growth experiments was designed to test the hypothesis that deformation/creep is the rate controlling step in LPSCC. These tests were performed on Alloy X-750 AH compact tension specimens at a various constant displacement rates. The deformation/creep rate within the crack tip zone is proportional to the test displacement rate. If crack growth rates were observed to increase with the load-line displacement rate, then this would indicate that deformation/creep is a critical SCC mechanism process. However, results obtained from the load-line displacement tests did not find X-750 AH SCC growth rate to be dependent on the position rate and therefore do not support the assumption that deformation/creep is the rate controlling process in LPSCC. The similarities between the SCC response of X-750, Alloy 600 and EN82H suggests that it is likely that the same SCC process is occurring for all these alloys (i.e., the same rate controlling step) and that deformation based models are also inappropriate for Alloy 600 and EN82H. The strong temperature and coolant hydrogen dependencies exhibited by these alloys make it more likely that nickel alloy LPSCC is controlled by an environmental or corrosion driven process.

D Morton

2005-10-19T23:59:59.000Z

364

Energy Productivity Via Time-of-Day Rates  

E-Print Network (OSTI)

Prompted by a combination of PURPA and a national concern about electricity price and supply, many utilities now have in place industrial time-of-day electric rates. When properly designed, these rates present an opportunity for energy-intensive industrial customers to lower their cost of power while at the same time improving the load characteristics of their utility supplier. This paper examines the present state of time-of-day rates and discusses steps that Air Products is taking to maximize their electric use productivity.

Michael, R. S.

1984-01-01T23:59:59.000Z

365

Standard Rates, Budget Office, Brookhaven National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard Rates Standard Rates for Brookhaven National Laboratory is available in PDF file formats. This file contains rates for Distributed Technical Services, Scientific Devices...

366

Whole Building Design Approach | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Approach Design Approach Whole Building Design Approach October 16, 2013 - 5:17pm Addthis Picture of a Spanish-style building with xeriscape, including palm trees. Camp Pendleton's temporary lodging facility was constructed from 20% recycled materials and will be 100% recyclable upon its distant demolition. The four-story South Mesa Lodge also received one of the U.S. Green Building Council's highest energy efficiency ratings, saving more than 30% percent of water, lighting, and overall utility usage. As defined by the Whole Building Design Guide, the goal of whole building design is to create a successful high-performance building by applying an integrated design and team approach to the project during the planning and programming phases. Whole building design has proven to help:

367

Rate Analysis of Two Photovoltaic Systems in San Diego  

DOE Green Energy (OSTI)

Analysts have found increasing evidence that rate structure has impacts on the economics of solar systems. This paper uses 2007 15-minute interval photovoltaic (PV) system and load data from two San Diego City water treatment facilities to illustrate impacts of different rate designs. The comparison is based on rates available in San Diego at the time of data collection and include proportionately small to large demand charges (relative to volumetric consumption), and varying on- and off- peak times. Findings are twofold for these large commercial systems: 1) transferring costs into demand charges does not result in savings and 2) changes in peak times do not result in a major cost difference during the course of a year. While lessons learned and discussion on rate components are based on the findings, the applicability is limited to buildings with similar systems, environments, rate options, and loads.

Doris, E.; Ong, S.; Van Geet, O.

2009-07-01T23:59:59.000Z

368

Holistic ship design optimization  

Science Conference Proceedings (OSTI)

Ship design is a complex endeavor requiring the successful coordination of many disciplines, of both technical and non-technical nature, and of individual experts to arrive at valuable design solutions. Inherently coupled with the design process is design ... Keywords: Enhanced survivability, Genetic algorithms, Holistic ship design, Minimization of resistance and wash, Multi-objective optimization

Apostolos Papanikolaou

2010-11-01T23:59:59.000Z

369

Whither design space?  

Science Conference Proceedings (OSTI)

Design space exploration is a long-standing focus in computational design research. Its three main threads are accounts of designer action, development of strategies for amplification of designer action in exploration, and discovery of computational ... Keywords: Design Space Exploration, Knowledge Representation, Search, State Space, Typed Feature Structures

Robert F. Woodbury; Andrew L. Burrow

2006-04-01T23:59:59.000Z

370

Coal Transportation Rate Sensitivity Analysis  

Reports and Publications (EIA)

On December 21, 2004, the Surface Transportation Board (STB) requested that the Energy Information Administration (EIA) analyze the impact of changes in coal transportation rates on projected levels of electric power sector energy use and emissions.Specifically, the STB requested an analysis of changes in national and regional coalconsumption and emissions resulting from adjustments in railroad transportation rates for Wyoming's Powder River Basin (PRB) coal using the National Energy Modeling System(NEMS). However, because NEMS operates at a relatively aggregate regional level and does not represent the costs of transporting coal over specific rail lines, this analysis reports on the impacts of interregional changes in transportation rates from those used in the Annual Energy Outlook 2005 (AEO2005) reference case.

John Conti

2005-04-01T23:59:59.000Z

371

Billiards with polynomial mixing rates  

E-Print Network (OSTI)

While many dynamical systems of mechanical origin, in particular billiards, are strongly chaotic -- enjoy exponential mixing, the rates of mixing in many other models are slow (algebraic, or polynomial). The dynamics in the latter are intermittent between regular and chaotic, which makes them particularly interesting in physical studies. However, mathematical methods for the analysis of systems with slow mixing rates were developed just recently and are still difficult to apply to realistic models. Here we reduce those methods to a practical scheme that allows us to obtain a nearly optimal bound on mixing rates. We demonstrate how the method works by applying it to several classes of chaotic billiards with slow mixing as well as discuss a few examples where the method, in its present form, fails.

Nikolai Chernov; Hong-Kun Zhang

2004-09-12T23:59:59.000Z

372

The impact of ventilation rate on the emission rates of volatile...  

NLE Websites -- All DOE Office Websites (Extended Search)

impact of ventilation rate on the emission rates of volatile organic compounds in residences Title The impact of ventilation rate on the emission rates of volatile organic...

373

Hardware implementation of wireless bit rate adaptation  

E-Print Network (OSTI)

This thesis presents a hardware implementation of the SoftRate bit-rate adaptation protocol. SoftRate is a new bit-rate adaptation protocol, which uses per-bit confidence hints generated by the convolutional decoder to ...

Gross, Samuel A

2010-01-01T23:59:59.000Z

374

Commercial Building Energy Asset Rating Tool User's Guide  

SciTech Connect

The U.S. Department of Energy’s Commercial Building Energy Asset Rating Tool is a web-based system that is designed to allow building owners, managers, and operators to more accurately assess the energy performance of their commercial buildings. This document provide a step-by-step instruction on how to use the tool.

Wang, Na; Makhmalbaf, Atefe; Matsumoto, Steven W.

2012-05-01T23:59:59.000Z

375

Survey of Impacts of Environmental Controls on Plant Heat Rate  

Science Conference Proceedings (OSTI)

Environmental controls for sulfur and nitrogen oxides, particulates, mercury, and other pollutants reduce the efficiency of power plants. This report documents the impacts of state-of-the-art environmental controls on power plant heat rate and identifies ways these impacts may be reduced through operating and design changes.

2009-12-07T23:59:59.000Z

376

NBSBR 84-2867 Test Procedures for Rating  

E-Print Network (OSTI)

NBSBR 84-2867 Test Procedures for Rating Residential Heating and Cooling Absorption Equipment U HEATING AND COOLING ABSORPTION EQUIPMENT Brian Weber Reinhard Radermacher David Didion U.S. DEPARTMENT-fired absorption devices operating in either the heating or cooling modes. These procedures are designed to include

Oak Ridge National Laboratory

377

Optimal control for linear-rate multi-mode systems  

Science Conference Proceedings (OSTI)

Linear-Rate Multi-Mode Systems is a model that can be seen both as a subclass of switched linear systems with imposed global safety constraints and as hybrid automata with no guards on transitions. We study the existence and design of a controller for ...

Dominik Wojtczak

2013-08-01T23:59:59.000Z

378

Energy Efficiency Interest Rate Reduction Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interest Rate Reduction Program Energy Efficiency Interest Rate Reduction Program Eligibility Residential Savings For Heating & Cooling Home Weatherization Construction Commercial...

379

Building Energy Performance Certificate. Asset Rating.  

U.S. Energy Information Administration (EIA)

Non-Domestic Building Energy Performance Asset Rating ... Asset Rating. Author: BRE Subject: LCEA029636 Keywords: Energy Performance Certificate ...

380

Solar control design package  

DOE Green Energy (OSTI)

Information used in the evaluation of design of Solar Control's solar heating and cooling system controller and the Solarstat is presented. System performance specifications, design data brochures, and detailed design drawings are presented.

Not Available

1978-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Computation & design for nanophotonics  

E-Print Network (OSTI)

The versatility of computational design as an alternative to design by nanofabrication has made computers a reliable design tool in nanophotonics. Given that almost any 2d pattern can be fabricated at infrared length scales, ...

Oskooi, Ardavan F

2010-01-01T23:59:59.000Z

382

Property:OpenEI/UtilityRate/DemandRateStructure/Tier4Rate | Open Energy  

Open Energy Info (EERE)

Rate" Rate" Showing 13 pages using this property. 4 4b524791-bef2-49b1-850b-458730755203 + 5 +, 6 +, 3 +, ... 4b524791-bef2-49b1-850b-458730755203 + 6 + 4b524791-bef2-49b1-850b-458730755203 + 3 + 4b524791-bef2-49b1-850b-458730755203 + 7 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 8 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 5 + 4b524791-bef2-49b1-850b-458730755203 + 6 + 4b524791-bef2-49b1-850b-458730755203 + 6 + E E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + E40880ac-c27b-4cbf-a011-b0d7d6e10fe9 + 1 + Retrieved from "http://en.openei.org/w/index.php?title=Property:OpenEI/UtilityRate/DemandRateStructure/Tier4Rate&oldid=53975

383

SIL rating fire protection equipment  

Science Conference Proceedings (OSTI)

SIL's (Safety Integrity Levels) are used by IEC 61508:1998 [1] to characterise the required functional safety of computer control systems. For example, SIL 4, the highest rating is for fly by wire aircraft and weapons systems and track circuited train ... Keywords: SIL, fire control panels, fire systems

Richard M. Robinson; Kevin J. Anderson

2003-10-01T23:59:59.000Z

384

Fast repetition rate (FRR) flasher  

DOE Patents (OSTI)

A fast repetition rate (FRR) flasher is described suitable for high flash photolysis including kinetic chemical and biological analysis. The flasher includes a power supply, a discharge capacitor operably connected to be charged by the power supply, and a flash lamp for producing a series of flashes in response to discharge of the discharge capacitor. A triggering circuit operably connected to the flash lamp initially ionizes the flash lamp. A current switch is operably connected between the flash lamp and the discharge capacitor. The current switch has at least one insulated gate bipolar transistor for switching current that is operable to initiate a controllable discharge of the discharge capacitor through the flash lamp. Control means connected to the current switch for controlling the rate of discharge of the discharge capacitor thereby to effectively keep the flash lamp in an ionized state between successive discharges of the discharge capacitor. Advantageously, the control means is operable to discharge the discharge capacitor at a rate greater than 10,000 Hz and even up to a rate greater than about 250,000 Hz. 14 figs.

Kolber, Z.; Falkowski, P.

1997-02-11T23:59:59.000Z

385

Electric Rate Alternatives to Cogeneration  

E-Print Network (OSTI)

This paper discusses electric rate alternatives to cogeneration for the industrial customer and attempts to identify the effects on the utility company, the industrial customer as well as remaining customers. It is written from the perspective of one company and its exposure to cogenerstion within its service territory.

Sandberg, K. R. Jr.

1988-09-01T23:59:59.000Z

386

Instability statistics and mixing rates  

E-Print Network (OSTI)

We claim that looking at probability distributions of \\emph{finite time} largest Lyapunov exponents, and more precisely studying their large deviation properties, yields an extremely powerful technique to get quantitative estimates of polynomial decay rates of time correlations and Poincar\\'e recurrences in the -quite delicate- case of dynamical systems with weak chaotic properties.

Roberto Artuso; Cesar Manchein

2009-06-03T23:59:59.000Z

387

2010FirmRateAdj  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Peaking Revenue Requirement 320.2 million P-SMPB--ED Composite Rate 33.25 millskWh Firm Demand 7.65kWmo Firm Energy 19.05 millskWh Firm Peaking Demand 6.90kWmo Firm...

388

Passive Solar Design  

Energy.gov (U.S. Department of Energy (DOE))

The difference between a passive solar home and a conventional home is design. Passive solar homes and other buildings are designed to take advantage of the local climate.

389

Western Area Power Administration, Desert Southwest Region Facilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Ratings Project Hoover-Mead 1 and 5 230-kV and Mead-Marketplace 500-kV Transmission Lines Continuation Sheet Project Description (Continued) Hoover-Mead 1 230-kV...

390

Low Power Design Low PowerLow Power  

E-Print Network (OSTI)

, correlations among system state transitions #12;Low Power Design USC/LPCAD Page 11 USCUSC Low PowerLow Power for the requestsIncoming rates for the requests 21,rr 12 ,rr, :, : State transition ratesState transition rates OS and hardware Abstract, hierarchical finite-state machine Each state represents power

Pedram, Massoud

391

Integrating energy expertise into building design  

SciTech Connect

Most commercial buildings designed to today will use more energy to operate, and cost more to design and construct than necessary. Significant energy savings cold be achieved with little or not increase in first cost if energy-efficient design technologies were used. Research into integration of building systems indicates that by considering energy performance early in the design process, energy savings between 30% and 50% of current energy consumption rates are technically and economically feasible. However, most building design teams do not adequately consider the energy impacts of design decisions to achieve these savings. The US Department of Energy has initiated a project, led by Pacific Northwest Laboratory, to develop advanced computer-based technologies that will help designers take advantage of these large potential energy savings. The objective of this work is to develop automated, intelligent, energy design assistance that can be integrated into computer aided design systems of the future. This paper examines the need for this technology by identifying the impediments to energy-efficient design, identifies essential and desirable features of such systems, presents the concept under development in this effort, illustrates how energy expertise might be incorporated into design, and discusses the importance of an integrated approach. 8 refs., 1 fig.

Brambley, M.R.; Stratton, R.C. (Pacific Northwest Lab., Richland, WA (USA)); Bailey, M.L. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (USA). Office of the Deputy Assistant Secretary for Building Technologies)

1990-08-01T23:59:59.000Z

392

DOE handbook: Design considerations  

SciTech Connect

The Design Considerations Handbook includes information and suggestions for the design of systems typical to nuclear facilities, information specific to various types of special facilities, and information useful to various design disciplines. The handbook is presented in two parts. Part 1, which addresses design considerations, includes two sections. The first addresses the design of systems typically used in nuclear facilities to control radiation or radioactive materials. Specifically, this part addresses the design of confinement systems and radiation protection and effluent monitoring systems. The second section of Part 1 addresses the design of special facilities (i.e., specific types of nonreactor nuclear facilities). The specific design considerations provided in this section were developed from review of DOE 6430.1A and are supplemented with specific suggestions and considerations from designers with experience designing and operating such facilities. Part 2 of the Design Considerations Handbook describes good practices and design principles that should be considered in specific design disciplines, such as mechanical systems and electrical systems. These good practices are based on specific experiences in the design of nuclear facilities by design engineers with related experience. This part of the Design Considerations Handbook contains five sections, each of which applies to a particular engineering discipline.

NONE

1999-04-01T23:59:59.000Z

393

Review on Ventilation Rate Measuring and Modeling Techniques in Naturally  

NLE Websites -- All DOE Office Websites (Extended Search)

Review on Ventilation Rate Measuring and Modeling Techniques in Naturally Review on Ventilation Rate Measuring and Modeling Techniques in Naturally Ventilated Building Speaker(s): Sezin Eren Ozcan Date: May 16, 2006 - 12:00pm Location: Bldg. 90 Due to limited energy sources, countries are looking for alternative solutions to decrease energy needs. In that context, natural ventilation can be seen as a very attractive sustainable technique in building design. However, understanding of ventilation dynamics is needed to provide an efficient control. Ventilation rate has to be determined not only in terms of energy, but also for controlling indoor air quality and emissions. For these reasons, agricultural buildings (livestock houses, greenhouses, etc.), naturally ventilated industrial buildings, and residences require a reliable ventilation rate measuring technique. Measuring techniques suffer

394

Austin Energy - Value of Solar Residential Rate (Texas) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin Energy - Value of Solar Residential Rate (Texas) Austin Energy - Value of Solar Residential Rate (Texas) Austin Energy - Value of Solar Residential Rate (Texas) < Back Eligibility Residential Savings Category Solar Buying & Making Electricity Program Info Start Date 10/01/2012 State Texas Austin Energy, the municipal utility of Austin Texas, offers the Value of Solar rate for residential solar photovoltaic (PV) systems. The Value of Solar tariff, designed by Austin Energy and approved by Austin City Council in June 2012, will be available for all past, present and future residential solar customers beginning October 1, 2012. This tariff replaces net billing for residential solar PV systems no larger than 20 kilowatts (kW). Under this new tariff, residential customers will be credited monthly for their solar generation based on the Value of Solar energy generated from

395

Lighting Electricity Rates on OpenEI | OpenEI Community  

Open Energy Info (EERE)

Lighting Electricity Rates on OpenEI Lighting Electricity Rates on OpenEI Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 31 May, 2013 - 12:04 API Utility Rates I'm pleased to announce that a new lighting rate category and about 10,000 lighting rates are now officially offered in OpenEI's utility rate database! Streetlights and other similar electric lighting uses are typically billed using uniquely designed lighting rates. Illinois State University (ISU) had contributed approximately 10,000 lighting rates, and now these rates have been categorized under a new "lighting" category (in the same dropdown list that contains "residential", "commercial" and "industrial" categories). With the new categorization, users can now query

396

Federal Energy Management Program: Water Rate Escalations  

NLE Websites -- All DOE Office Websites (Extended Search)

Rate Rate Escalations to someone by E-mail Share Federal Energy Management Program: Water Rate Escalations on Facebook Tweet about Federal Energy Management Program: Water Rate Escalations on Twitter Bookmark Federal Energy Management Program: Water Rate Escalations on Google Bookmark Federal Energy Management Program: Water Rate Escalations on Delicious Rank Federal Energy Management Program: Water Rate Escalations on Digg Find More places to share Federal Energy Management Program: Water Rate Escalations on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Greenhouse Gases Water Efficiency Basics Federal Requirements Best Management Practices Analysis and Evaluation Water Rate Escalations Evaluation Service Contracts Case Studies Resources

397

USING AN ADAPTER TO PERFORM THE CHALFANT-STYLE CONTAINMENT VESSEL PERIODIC MAINTENANCE LEAK RATE TEST  

Science Conference Proceedings (OSTI)

Recently the Packaging Technology and Pressurized Systems (PT&PS) organization at the Savannah River National Laboratory was asked to develop an adapter for performing the leak-rate test of a Chalfant-style containment vessel. The PT&PS organization collaborated with designers at the Department of Energy's Pantex Plant to develop the adapter currently in use for performing the leak-rate testing on the containment vessels. This paper will give the history of leak-rate testing of the Chalfant-style containment vessels, discuss the design concept for the adapter, give an overview of the design, and will present results of the testing done using the adapter.

Loftin, B.; Abramczyk, G.; Trapp, D.

2011-06-03T23:59:59.000Z

398

Designing decommissioning into new reactor designs  

SciTech Connect

One of the lessons learned from decommissioning of existing reactors has been that decommissioning was not given much thought when these reactors were designed some three or four decades ago. Recently, the nuclear power has seen a worldwide resurgence and many new advanced reactor designs are either on the market or nearing design completion. Most of these designs are evolutionary in nature and build on the existing and proven technologies. They also incorporate many improvements and take advantage of the substantial operating experience. Nevertheless, by and large, the main factors driving the design of new reactors are the safety features, safeguards considerations, and the economic factors. With a large decommissioning experience that already exists in the nuclear industry, and with average decommissioning costs at around six hundred million dollars for each reactor in today's dollars, it is necessary that decommissioning factors also be considered as a part of the early design effort. Even though decommissioning may be sixty years down the road from the time they go on line, it is only prudent that new designs be optimized for eventual decommissioning, along with the other major considerations. (authors)

Devgun, J.S.; CHMM, Ph.D. [Nuclear Power Technologies, Sargent and Lundy LLC, Chicago, IL (United States)

2007-07-01T23:59:59.000Z

399

AEROSOL PARTICLE COLLECTOR DESIGN STUDY  

Science Conference Proceedings (OSTI)

A computational evaluation of a particle collector design was performed to evaluate the behavior of aerosol particles in a fast flowing gas stream. The objective of the work was to improve the collection efficiency of the device while maintaining a minimum specified air throughput, nominal collector size, and minimal power requirements. The impact of a range of parameters was considered subject to constraints on gas flow rate, overall collector dimensions, and power limitations. Potential improvements were identified, some of which have already been implemented. Other more complex changes were identified and are described here for further consideration. In addition, fruitful areas for further study are proposed.

Lee, S; Richard Dimenna, R

2007-09-27T23:59:59.000Z

400

Radiological design guide  

SciTech Connect

The purpose of this design guide is to provide radiological safety requirements, standards, and information necessary for designing facilities that will operate without unacceptable risk to personnel, the public, or the environment as required by the US Department of Energy (DOE). This design guide, together with WHC-CM-4-29, Nuclear Criticality Safety, WHC-CM-4-46, Nonreactor Facility Safety Analysis, and WHC-CM-7-5, Environmental Compliance, covers the radiation safety design requirements at Westinghouse Hanford Company (WHC). This design guide applies to the design of all new facilities. The WHC organization with line responsibility for design shall determine to what extent this design guide shall apply to the modifications to existing facilities. In making this determination, consideration shall include a cost versus benefit study. Specifically, facilities that store, handle, or process radioactive materials will be covered. This design guide replaces WHC-CM-4-9 and is designated a living document. This design guide is intended for design purposes only. Design criteria are different from operational criteria and often more stringent. Criteria that might be acceptable for operations might not be adequate for design.

Evans, R.A.

1994-08-16T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Further Study on Atmospheric Lapse Rate Regimes  

Science Conference Proceedings (OSTI)

Lapse rate, moist adiabatic lapse rate and the critical lapse rate for baroclinic adjustment are calculated as was done by Stone and Carlson using a different data set covering both hemispheres. Results show very good agreement in low latitudes, ...

Shi-Keng Yang; G. Louis Smith

1985-05-01T23:59:59.000Z

402

Narrowing the estimates of species migration rates  

E-Print Network (OSTI)

of species migration rates How fast can species migrate?estimate population growth rates for each population sinceon their data 1 show that the rate of population spread is

Blois, Jessica L.

2013-01-01T23:59:59.000Z

403

Failure rate data for fusion safety and risk assessment  

SciTech Connect

The Fusion Safety Program (FSP) at the Idaho National Engineering Laboratory (INEL) conducts safety research in materials, chemical reactions, safety analysis, risk assessment, and in component research and development to support existing magnetic fusion experiments and also to promote safety in the design of future experiments. One of the areas of safety research is applying probabilistic risk assessment (PRA) methods to fusion experiments. To apply PRA, we need a fusion-relevant radiological dose code and a component failure rate data base. This paper describes the FSP effort to develop a failure rate data base for fusion-specific components.

Cadwallader, L.C.

1993-01-01T23:59:59.000Z

404

Failure rate data for fusion safety and risk assessment  

SciTech Connect

The Fusion Safety Program (FSP) at the Idaho National Engineering Laboratory (INEL) conducts safety research in materials, chemical reactions, safety analysis, risk assessment, and in component research and development to support existing magnetic fusion experiments and also to promote safety in the design of future experiments. One of the areas of safety research is applying probabilistic risk assessment (PRA) methods to fusion experiments. To apply PRA, we need a fusion-relevant radiological dose code and a component failure rate data base. This paper describes the FSP effort to develop a failure rate data base for fusion-specific components.

Cadwallader, L.C.

1993-04-01T23:59:59.000Z

405

Definition: Thermal Rating | Open Energy Information  

Open Energy Info (EERE)

Rating Jump to: navigation, search Dictionary.png Thermal Rating The maximum amount of electrical current that a transmission line or electrical facility can conduct over a...

406

4. Trends in Natural Gas Transportation Rates  

U.S. Energy Information Administration (EIA)

Energy Information Administration 39 Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates 4. Trends in Natural Gas Transportation Rates

407

Form:Utility Rate | Open Energy Information  

Open Energy Info (EERE)

Form Edit History Facebook icon Twitter icon Form:Utility Rate Jump to: navigation, search Add or Update Utility Rate Information Retrieved from "http:en.openei.orgw...

408

Building Energy Transparency: A Framework for Implementing... Energy Rating  

NLE Websites -- All DOE Office Websites (Extended Search)

Transparency: A Framework for Implementing... Transparency: A Framework for Implementing... Energy Rating & Disclosure Policy Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

409

Conceptual Safety Design RM  

Energy.gov (U.S. Department of Energy (DOE))

The Conceptual Safety Design (CSD) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the Conceptual Safety Design work, processes and...

410

Final Design RM  

Energy.gov (U.S. Department of Energy (DOE))

The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical sufficiency of the final design prior to CD-3...

411

Preliminary Safety Design RM  

Energy.gov (U.S. Department of Energy (DOE))

The Preliminary Safety Design (PSD) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the Preliminary Safety Design work, processes and...

412

Seismic Design Expectations Report  

Energy.gov (U.S. Department of Energy (DOE))

The Seismic Design Expectations Report (SDER) is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project seismic design activities prior to...

413

Energy design for architects  

Science Conference Proceedings (OSTI)

This book contains techniques for energy efficiency in architectural design. Many aspects are covered including: cost; comfort and health; energy use; the design process; and analytical techniques. 202 figs. (JF)

Shaw, A. (ed.)

1989-01-01T23:59:59.000Z

414

Design of intelligent interiors  

E-Print Network (OSTI)

Ubiquitous computing is transforming interior design by allowing utilities, goods and information to be delivered where and when we need them. How will new information technologies impact the design of interior spaces? ...

Bonanni, Leonardo Amerigo, 1977-

2005-01-01T23:59:59.000Z

415

Investigations in Pyranometer Design  

Science Conference Proceedings (OSTI)

Three approaches to the design of total (global) solar pyranometers that employ new technologies and materials of manufacture are described. The pyranometers are designed to meet or exceed the requirements for high quality instruments as ...

D. J. Beaubien; A. Bisberg; A. F. Beaubien

1998-06-01T23:59:59.000Z

416

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

417

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

418

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

419

utility rate | OpenEI Community  

Open Energy Info (EERE)

utility rate utility rate Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 11:14 Utility Rates API Version 2 is Live! API developer OpenEI update utility Utility Companies utility rate Utility Rates version 1 version 2 version 3 web service Smart meter After several months of development and testing, the next generation web service for the utility rate database is finally here! I encourage you to check out the V2 Utility Rates API at http://en.openei.org/services/doc/rest/util_rates Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 June, 2012 - 09:30 Increasing ask query limit developer utility rate An NREL user who is trying to use the utility rate service was having an issue. He writes "I noticed that any rates past 10,000 are not accessible via json. For example, this query only returns two entries:

420

Furnace Design and Operation  

Science Conference Proceedings (OSTI)

...S. Lampman, Energy-Efficient Heat-Treating Furnace Design and Operation, Heat Treating, Vol 4, ASM Handbook, ASM International,

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

RI critical in surburban hvdc substation design  

SciTech Connect

Access to existing rights of way, site availability and ample short circuit capabilities led to the location of Sylmar hvdc substation within the city limits of Los Angeles. The Department of Water and Power, in choosing this site as the southern terminus of the 851 mile, 400 kV, hvdc transmission line from The Dalles, Oregon, was faced with unusual problems in the suppression of radio and telephone interference.

York, E.

1968-07-01T23:59:59.000Z

422

Participation in design things  

Science Conference Proceedings (OSTI)

This paper discusses the design of things. This is done in an attempt to conceptually explore some of the political and practical challenges to participatory design today. Which things, and which participants? The perspective is strategic and conceptual. ... Keywords: design, object, participation, public, thing, use

Pelle Ehn

2008-10-01T23:59:59.000Z

423

Wet Stacks Design Guide  

Science Conference Proceedings (OSTI)

The expense of fluegas reheat has led to increased application of less expensive wet stacks downstream of wet FGD (flue gas desulfurization) systems. Good data is necessary to properly design the wet stack system or serious problems can occur. This design guide summarizes all the latest information and provides guidance on developing detailed design specifications.

1997-01-04T23:59:59.000Z

424

Failure Rate Data Analysis for High Technology Components  

SciTech Connect

Understanding component reliability helps designers create more robust future designs and supports efficient and cost-effective operations of existing machines. The accelerator community can leverage the commonality of its high-vacuum and high-power systems with those of the magnetic fusion community to gain access to a larger database of reliability data. Reliability studies performed under the auspices of the International Energy Agency are the result of an international working group, which has generated a component failure rate database for fusion experiment components. The initial database work harvested published data and now analyzes operating experience data. This paper discusses the usefulness of reliability data, describes the failure rate data collection and analysis effort, discusses reliability for components with scarce data, and points out some of the intersections between magnetic fusion experiments and accelerators.

L. C. Cadwallader

2007-07-01T23:59:59.000Z

425

Rates and progenitors of type Ia supernovae  

SciTech Connect

The remarkable uniformity of Type Ia supernovae has allowed astronomers to use them as distance indicators to measure the properties and expansion history of the Universe. However, Type Ia supernovae exhibit intrinsic variation in both their spectra and observed brightness. The brightness variations have been approximately corrected by various methods, but there remain intrinsic variations that limit the statistical power of current and future observations of distant supernovae for cosmological purposes. There may be systematic effects in this residual variation that evolve with redshift and thus limit the cosmological power of SN Ia luminosity-distance experiments. To reduce these systematic uncertainties, we need a deeper understanding of the observed variations in Type Ia supernovae. Toward this end, the Nearby Supernova Factory has been designed to discover hundreds of Type Ia supernovae in a systematic and automated fashion and study them in detail. This project will observe these supernovae spectrophotometrically to provide the homogeneous high-quality data set necessary to improve the understanding and calibration of these vital cosmological yardsticks. From 1998 to 2003, in collaboration with the Near-Earth Asteroid Tracking group at the Jet Propulsion Laboratory, a systematic and automated searching program was conceived and executed using the computing facilities at Lawrence Berkeley National Laboratory and the National Energy Research Supercomputing Center. An automated search had never been attempted on this scale. A number of planned future large supernovae projects are predicated on the ability to find supernovae quickly, reliably, and efficiently in large datasets. A prototype run of the SNfactory search pipeline conducted from 2002 to 2003 discovered 83 SNe at a final rate of 12 SNe/month. A large, homogeneous search of this scale offers an excellent opportunity to measure the rate of Type Ia supernovae. This thesis presents a new method for analyzing the true sensitivity of a multi-epoch supernova search and finds a Type Ia supernova rate from z {approx} 0.01-0.1 of r{sub V} = 4.26{sub -1.93 -0.10}{sup +1.39 +0.10} h{sup 3} x 10{sup -4} SNe Ia/yr/Mpc{sup 3} from a preliminary analysis of a subsample of the SNfactory prototype search. Several unusual supernovae were found in the course of the SNfactory prototype search. One in particular, SN 2002ic, was the first SN Ia to exhibit convincing evidence for a circumstellar medium and offers valuable insight into the progenitors of Type Ia supernovae.

Wood-Vasey, William Michael

2004-08-16T23:59:59.000Z

426

The impact of retail rate structures on the economics of commercial photovoltaic systems in California  

E-Print Network (OSTI)

How Effective State Net Metering Laws Can RevolutionalizeThe value of net metering is found to be substantial, butRetail rate design, Net metering Introduction The solar

Mills, Andrew D.

2009-01-01T23:59:59.000Z

427

Evaluation of design ventilation requirements for enclosed parking facilities  

SciTech Connect

This paper proposes a new design approach to determine the ventilation requirements for enclosed parking garages. The design approach accounts for various factors that affect the indoor air quality within a parking facility, including the average CO emission rate, the average travel time, the number of cars, and the acceptable CO level within the parking garage. This paper first describes the results of a parametric analysis based on the design method that was developed. Then the design method is presented to explain how the ventilation flow rate can be determined for any enclosed parking facility. Finally, some suggestions are proposed to save fan energy for ventilating parking garages using demand ventilation control strategies.

Ayari, A.; Krarti, M.

2000-07-01T23:59:59.000Z

428

Attached sunspace design analysis  

DOE Green Energy (OSTI)

An introduction to new design analysis information for attached sunspaces is presented. The 28 sunspace reference designs are described. Note is taken of those designs (the semi-enclosed geometries) analyzed more recently than the previously published reports. The role of sensitivity studies is discussed, and some sample plots of sunspace performance sensitivity to key design parameters are presented. The monthly solar load ratio (SLR) correlations are reviewed with emphasis on the modified SLR used in the sunspace analysis. The application of the sunspace SLR correlations to monthly design analysis is outlined.

Jones, R.W.; McFarland, R.D.

1981-01-01T23:59:59.000Z

429

PBXN-9 Ignition Kinetics and Deflagration Rates  

SciTech Connect

The ignition kinetics and deflagration rates of PBXN-9 were measured using specially designed instruments at LLNL and compared with previous work on similar HMX based materials. Ignition kinetics were measured based on the One Dimensional Time-to-Explosion combined with ALE3D modeling. Results of these experiments indicate that PBXN-9 behaves much like other HMX based materials (i.e. LX-04, LX-07, LX-10 and PBX-9501) and the dominant factor in these experiments is the type of explosive, not the type of binder/plasticizer. In contrast, the deflagration behavior of PBXN-9 is quite different from similar high weight percent HMX based materials (i.e LX-10, LX-07 and PBX-9501). PBXN-9 burns in a laminar manner over the full pressure range studied (0-310 MPa) unlike LX-10, LX-07, and PBX-9501. The difference in deflagration behavior is attributed to the nature of the binder/plasticizer alone or in conjunction with the volume of binder present in PBXN-9.

Glascoe, E; Maienschein, J; Burnham, A; Koerner, J; Hsu, P; Wemhoff, A

2008-04-24T23:59:59.000Z

430

The Building Design Advisor  

SciTech Connect

The Building Design Advisor (BDA) is a software environment that supports the integrated use of multiple analysis and visualization tools throughout the building design process, from the initial, schematic design phases to the detailed specification of building components and systems. Based on a comprehensive design theory, the BDA uses an object-oriented representation of the building and its context, and acts as a data manager and process controller to allow building designers to quickly navigate through the multitude of descriptive and performance parameters addressed by the analysis and visualization tools linked to the BDA. Through the Browser the user can edit the values of input parameters and select any number of input and/or output parameters for display in the Decision Desktop. The Desktop allows building designers to compare multiple design alternatives with respect to any number of parameters addressed by the tools linked to the BDA.

Papamichael, K.; LaPorta, J.; Chauvet, H.; Collins, D.; Trzcinski, T.; Thorpe, J.; Selkowitz, S.

1996-03-01T23:59:59.000Z

431

Visualization Design Environment  

SciTech Connect

Improvements in the performance and capabilities of computer software and hardware system, combined with advances in Internet technologies, have spurred innovative developments in the area of modeling, simulation and visualization. These developments combine to make it possible to create an environment where engineers can design, prototype, analyze, and visualize components in virtual space, saving the time and expenses incurred during numerous design and prototyping iterations. The Visualization Design Centers located at Sandia National Laboratories are facilities built specifically to promote the ''design by team'' concept. This report focuses on designing, developing and deploying this environment by detailing the design of the facility, software infrastructure and hardware systems that comprise this new visualization design environment and describes case studies that document successful application of this environment.

Pomplun, A.R.; Templet, G.J.; Jortner, J.N.; Friesen, J.A.; Schwegel, J.; Hughes, K.R.

1999-02-01T23:59:59.000Z

432

Final Beamline Design Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Beamline Design Report Final Beamline Design Report Guidelines and Review Criteria (SCD 1.20.95) 6.0 Final Beamline Design Report (FDR) Overview The Final Beamline Design Report is part of the Advanced Photon Source (APS) beamline review process and should be planned for when approximately 90% of the total beamline design has been completed. Fifteen copies of the FDR are to be submitted to the APS Users Office. Approval of the Collaborative Access Team's (CAT) designs described in the report is required prior to installation of beamline components in the APS Experiment Hall. Components that have a long lead time for design or procurement can be reviewed separately from the remainder of the beamline, but enough information must be provided so that the reviewer can understand the

433

Puerto Rico time-of-day rates demonstration. Final report  

SciTech Connect

The Puerto Rico Time of Day (TOD) electric rate demonstration project consists of three distinct studies: (A) Low usage customers (less than or equal to425 kWh per 30 consecutive days) are compared for a 12 hours peak period rate, against a control group of similar usage. (B) High usage customers (>425 kWh per 30 consecutive days) are assigned a single 12 hours peak period experimental rate. (C) High usage customers, assigned to a number of different experimental rates and compared against a control group (also used for B). For this group, peak period lengths are fixed at a specific six hour period and rates are allowed to vary. For comparative purposes a control group is included. As part of this experiment an entry and exit survey have been designed. The purpose of the surveys is to find out the changes in electric consumption stock and life style of the participants from the start to the end of the project. As participants were assigned to rates or control groups on a random basis, the emphasis of the entry survey analysis is to determine if there are any significant statistical differences among the selected participants.

1985-01-01T23:59:59.000Z

434

Upscaling Calcite Growth Rates From the Mesoscale to the Macroscale  

Science Conference Proceedings (OSTI)

Quantitative prediction of mineral reaction rates in the subsurface remains a daunting task partly because a key parameter for macroscopic models, the reactive site density, is poorly constrained. Here we report atomic force microscopy (AFM) measurements on the calcite surface of monomolecular step densities, treated as equivalent to the reactive site density, as a function of aqueous calcium-to-carbonate ratio and saturation index. Data for the obtuse step orientation are combined with existing step velocity measurements to generate a model that predicts overall macroscopic calcite growth rates. The model is quantitatively consistent with several published macroscopic rates under a range of alkaline solution conditions, particularly for two of the most comprehensive data sets without the need for additional fit parameters. The model reproduces peak growth rates and its functional form is simple enough to be incorporated into reactive transport or other macroscopic models designed for predictions in porous media. However, it currently cannot model equilibrium, pH effects, and may overestimate rates at high aqueous calcium-to-carbonate ratios. The discrepancies in rates at high calcium-to-carbonate ratios may be due to differences in pre-treatment, such as exposing the seed material to SI 1.0 to generate/develop growth hillocks, or other factors.

Bracco, Jacquelyn N [ORNL; Stack, Andrew G [ORNL; Steefel, Carl I [Lawrence Berkeley National Laboratory (LBNL)

2013-01-01T23:59:59.000Z

435

Property:OpenEI/UtilityRate/EnergyRateStructure/Tier5Rate | Open Energy  

Open Energy Info (EERE)

Rate" Rate" Showing 25 pages using this property. (previous 25) (next 25) 0 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 00c88d6d-e3b0-4128-ad3e-a93f686cf6e3 + 0.227 + 019be14c-4635-4529-af90-799cbf5d7865 + 0.0335 + 019be14c-4635-4529-af90-799cbf5d7865 + 0.0335 + 02b061e1-f065-421e-9ebc-76aef4734486 + 0.079 + 02b061e1-f065-421e-9ebc-76aef4734486 + 0.079 + 02fc76fd-35ff-44c3-bc85-1fb1918f125b + 0.0978 + 02fc76fd-35ff-44c3-bc85-1fb1918f125b + 0.0978 + 0402cc99-ab16-40cc-83e7-2c5910a825a1 + 0.061 + 0402cc99-ab16-40cc-83e7-2c5910a825a1 + 0.061 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.0587 +, 0.044 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.044 + 041466a9-81ca-4fce-90e3-e718159347a9 + 0.0587 + 047086c9-976d-4a05-90d5-b67afaf60851 + 0.0583 +

436

Building Design | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design Building Design October 16, 2013 - 4:41pm Addthis Planning, Programming & Budgeting Building Design Project Construction Integrating renewable energy within Federal new construction or major renovations is critical at each phase of the design process. This overview covers considerations for renewable energy in the design phases of a construction project, including choosing the design team, the design team charrette, preliminary design, schematic design, design development, and construction documents. Information on this page introduces each of the design phases and provides a link to deeper-level information. Key Actions in Building Design Require specific renewable energy experience and skills for design team. Prioritize energy-related program

437

The status of low dose rate and future of high dose rate Cf-252 brachytherapy  

Science Conference Proceedings (OSTI)

This work describes the current status of the US low dose rate (LDR) Cf-252 brachytherapy program. The efforts undertaken towards development of a high dose rate (HDR) remotely after loaded Cf-252 source, which can accommodate 1 mg or greater Cf-252, are also described. This HDR effort is a collaboration between Oak Ridge National Laboratory (ORNL), commercial remote after loader manufactures, the Gershenson Radiation Oncology Center (ROC), and Wayne State University. To achieve this goal, several advances in isotope chemistry and source preparation at ORNL must be achieved to yield a specific material source loading of greater than or equal 1 mg Cf-252 per mm3. Development work with both radioactive and non-radioactive stand-ins for Cf-252 have indicated the feasibility of fabricating such sources. As a result, the decreased catheter diameter and computer controlled source placement will permit additional sites (e.g. brain, breast, prostate, lung, parotid, etc.) to be treated effectively with Cf-252 sources. Additional work at the Radiochemical Engineering and Development Center (REDC) remains in source fabrication, after loader modification, and safe design. The current LDR Cf-252 Treatment Suite at the ROC is shielded and licensed to hold up to 1 mg of Cf-252. This was designed to maintain cumulative personnel exposure, both external to the room and in direct isotope handling, at less than 20 microSv/hr. However, cumulative exposure may be greatly decreased if a Cf-252 HDR unit is employed which would eliminate direct isotope handling and decrease treatment times from tilde 3 hours to an expected range of 3 to 15 minutes. Such a Cf-252 HDR source will also demonstrate improved dose distributions over current LDR treatments due to the ability to step the point-like source throughout the target volume and weight the dwell time accordingly.

Rivard, M.J.; Wierzbicki, J.G.; Van den Heuvel, F.; Chuba, P.J.; Fontanesi, J. [Wayne State Univ., Detroit, MI (United States). Dept. of Radiation Oncology; Martin, R.C.; McMahon, R.R.; Haire, R.G. [Oak Ridge National Lab., TN (United States)

1997-12-01T23:59:59.000Z

438

Pre-physical data base design heuristics  

Science Conference Proceedings (OSTI)

Keywords: data base, data base design, data base management, data model, denormalization, design improvement, design refinement, physical design, system design

Narciso Cerpa

1995-06-01T23:59:59.000Z

439

Design and Evaluation of Hybrid Fault-Detection Systems  

Science Conference Proceedings (OSTI)

As chip densities and clock rates increase, processors are becoming more susceptible to transient faults that can affect program correctness. Up to now, system designers have primarily considered hardware-only and software-only fault-detection mechanisms ...

George A. Reis; Jonathan Chang; Neil Vachharajani; Ram Rangan; David I. August; Shubhendu S. Mukherjee

2005-06-01T23:59:59.000Z

440

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Computerized extrapolation of hydrolysis rate data  

Science Conference Proceedings (OSTI)

The program RATE was developed to aid in the extrapolation and interpretation of hydrolysis rate data to a format that is useful for environmental risk assessment. Hydrolysis data typically are reported in the literature as pseudo-first-order rate constants at the temperature and pH of the reaction medium used to obtain the kinetics information. The utility of RATE lies in its ability to estimate first-order rate constants at other values of temperature and pH and to convert pseudo-first-order rate constants to second-order rate constants. RATE also will calculate the half-life for the overall reaction, including neutral-, base-, and acid-mediated hydrolysis, at any selected temperature and pH. RATE, programmed in FORTRAN, is used to systematically analyze data for entry in FATE, a comprehensive environmental fate constants information system database.

Hamrick, K.J.; Kollig, H.P.; Bartell, B.A.

1992-01-01T23:59:59.000Z

442

The effect of additives on lime dissolution rates. Final report  

Science Conference Proceedings (OSTI)

Based on the previous years` studies concerning the efficiency of SO{sub 2} removal by spray dryers with high sulfur coal flue gas, the work for year five included investigations of lime dissolution rates at different slaking conditions and with the effect of additives. The prominent additives that have significant effects on lime dissolution rates were tested with the mini pilot spray drying absorber to see their effects on spray drying desulfurization applications. The mechanisms of these additive effects along with the properties of hygroscopic additives have been discussed and incorporated into the spray drying desulfurization model ``SPRAYMOD-M.`` Slaking conditions are very important factors in producing high quality lime slurry in spray drying desulfurization processes. At optimal slaking conditions, the slaked lime particles are very fine (3-5{mu}m) and the slaked lime has high BET surface areas which are beneficial to the desulfurization. The slaked lime dissolution rate experiments in our study are designed to determine how much lime can dissolve in a unit time if the initial lime surface area is kept constant. The purpose of the dissolution rate study for different additives is to find those effective additives that can enhance lime dissolution rates and to investigate the mechanisms of the dissolution rate enhancement properties for these additives. The applications of these additives on spray drying desulfurization are to further verify the theory that dissolution rate is a rate limiting step in the whole spray drying desulfurization process as well as to test the feasibility of these additives on enhancing SO{sub 2} removal in spray dryers.

Khang, S.J.

1996-07-31T23:59:59.000Z

443

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

444

Labs21 sustainable design programming checklist version 1.0  

SciTech Connect

This checklist of sustainable design objectives and strategies can be used in the programming and conceptual design phases of a laboratory project. It includes the following: (1) Brief descriptions of each objective and strategy. (2) Metrics for each objective. This checklist is primarily to be used by owners, architects and engineers during the programming and conceptual design phase of a project. It is especially appropriate for use in design charrettes. The strategies and metrics can be included as requirements in the programming document or can be identified for further analysis or consideration during the design development phase. This checklist is hierarchically organized into design areas, objectives for each design area, and strategies and metrics for each objective. The design areas generally correspond to the design areas of the LEED(TM) rating system from the U.S. Green Building Council.

Mathew, Paul; Greenberg, Steve

2005-01-07T23:59:59.000Z

445

Central ballast tanker design  

SciTech Connect

The purpose of this paper is to present the CENTRAL BALLAST TANKER Design. This design is intended to reduce the volume of oil spilled from tankers by giving the crew a tanker properly designed and equipped to allow large quantities of oil from ruptured tank(s) to flow safely to a fully-inerted central ballast tank. In addition to reducing the volume of oil spilled, the design also addresses many of the shortcomings of the DOUBLE HULL DESIGN which are increasingly becoming a concern. The following is a brief review of the development of the CENTRAL BALLAST TANKER. The simple operational features, stability, low cost and ease of maintenance of the single hull tanker were important and can be retained with the CENTRAL BALLAST DESIGN.

1997-01-01T23:59:59.000Z

446

Parametric Analysis of a 6500-Btu/kWh Heat Rate Dispersed Generator  

Science Conference Proceedings (OSTI)

Cost and performance assessments of two alternative system designs for a 2-MW molten carbonate fuel cell power plant yielded encouraging results: a 6500-Btu/kWh heat rate and a total plant investment of $1200-$1300/kW. Differences between the two designs establish a permissible range of operating conditions for the fuel cell that will help guide its development.

1985-08-14T23:59:59.000Z

447

Design review report for the SY-101 RAPID mitigation system  

Science Conference Proceedings (OSTI)

This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitigation System. As part of the SY-101 Surface-Level-Rise Remediation Project, the SY-101 WID Mitigation System will reduce the potential unacceptable consequences of crust growth in Tank 241-SY-101 (SY-101). Projections of the crust growth rate indicate that the waste level in the tank may reach the juncture of the primary and secondary confinement structures of the tank late in 1999. Because of this time constraint, many design activities are being conducted in parallel and design reviews were conducted for system adequacy as well as design implementation throughout the process. Design implementation, as used in this design review report, is the final component selection (e.g., which circuit breaker, valve, or thermocouple) that meets the approved design requirements, system design, and design and procurement specifications. Design implementation includes the necessary analysis, testing, verification, and qualification to demonstrate compliance with the system design and design requirements. Design implementation is outside the scope of this design review. The design activities performed prior to detailed design implementation (i.e., system mission requirements, functional design requirements, technical criteria, system conceptual design, and where design and build contracts were placed, the procurement specification) have been reviewed and are within the scope of this design review report. Detailed design implementation will be controlled, reviewed, and where appropriate, approved in accordance with Tank Waste Remediation System (TWRS) engineering procedures. Review of detailed design implementation will continue until all components necessary to perform the transfer function are installed and tested.

SCHLOSSER, R.L.

1999-05-24T23:59:59.000Z

448

Measurement of Passive Uptake Rates for Volatile Organic Compounds on  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement of Passive Uptake Rates for Volatile Organic Compounds on Measurement of Passive Uptake Rates for Volatile Organic Compounds on Commercial Thermal Desorption Tubes and the Effect of Ozone on Sampling Title Measurement of Passive Uptake Rates for Volatile Organic Compounds on Commercial Thermal Desorption Tubes and the Effect of Ozone on Sampling Publication Type Report LBNL Report Number LBNL-6257E Year of Publication 2013 Authors Maddalena, Randy L., Amanda Parra, Marion L. Russell, and Wen-Yee Lee Publisher Lawrence Berkeley National Laboratory City Berkeley Keywords indoor air quality, Passive Sampling, Uptake Rates, vocs Abstract Diffusive or passive sampling methods using commercially filled axial-sampling thermal desorption tubes are widely used for measuring volatile organic compounds (VOCs) in air. The passive sampling method provides a robust, cost effective way to measure air quality with time-averaged concentrations spanning up to a week or more. Sampling rates for VOCs can be calculated using tube geometry and Fick's Law for ideal diffusion behavior or measured experimentally. There is evidence that uptake rates deviate from ideal and may not be constant over time. Therefore, experimentally measured sampling rates are preferred. In this project, a calibration chamber with a continuous stirred tank reactor design and constant VOC source was combined with active sampling to generate a controlled dynamic calibration environment for passive samplers. The chamber air was augmented with a continuous source of 45 VOCs ranging from pentane to diethyl phthalate representing a variety of chemical classes and physiochemical properties. Both passive and active samples were collected on commercially filled Tenax TA thermal desorption tubes over an 11-day period and used to calculate passive sampling rates. A second experiment was designed to determine the impact of ozone on passive sampling by using the calibration chamber to passively load five terpenes on a set of Tenax tubes and then exposing the tubes to different ozone environments with and without ozone scrubbers attached to the tube inlet. During the sampling rate experiment, the measured diffusive uptake was constant for up to seven days for most of the VOCs tested but deviated from linearity for some of the more volatile compounds between seven and eleven days. In the ozone experiment, both exposed and unexposed tubes showed a similar decline in terpene mass over time indicating back diffusion when uncapped tubes were transferred to a clean environment but there was no indication of significant loss by ozone reaction.

449

Dwell on Design [Dispatches  

E-Print Network (OSTI)

use, and urban design. Toyota USA, Inc. , provided majorE)MergingThoughts The support from Toyota was par- ticularlyyears. ” For companies like Toyota, this transformation to a

Sullivan, Lisa

2007-01-01T23:59:59.000Z

450

PREFACE THE DESIGN MANUAL  

E-Print Network (OSTI)

developed and adopted a series of documents that describe the codes, standards, details, products, and practices to be followed by Architect/Engineers (A/Es). These documents apply to all design of construction at all facilities on property owned by the Authority. Facilities constructed or modified on the site occupied by the National Air and Space Museum located at Washington Dulles International Airport are exempt from the requirements of the Authority Design Manual. The Design Manual has been developed to assist Architects/Engineers (A/Es) in understanding the practices and policies that must be incorporated into each project. The Design Manual contains a number of specific requirements that must be followed on all projects, as described above. These can be either Authority contracted projects, Authority direct-constructed projects, and tenant contracted projects. APPLICABILITY OF THE DESIGN MANUAL The requirements for design and construction incorporated into the Design Manual and Supporting Volumes are regulations approved by the Metropolitan Washington Airports Authority Board of Directors and shall be considered contract requirements for all A/Es who are performing services under contract to the Authority. Although A/Es who are under contract to tenants of the Authority may not be working under contract provisions that make compliance with these requirements mandatory, the Authority reserves the right, as Owner of all airport facilities, and land on which tenant buildings are constructed, to reject any design or work that does not comply with the requirements of the Design Manual and its

unknown authors

2010-01-01T23:59:59.000Z

451

Interior Design Sample Occupations  

E-Print Network (OSTI)

Companies Historic Preservation Agencies Hospitals Interior Design Firms/Studios Hotel Chains Cost Estimator Architect Manufacturer's Representative Schools Television and Motion Picture Studios Theatres Utilities

Ronquist, Fredrik

452

The LCLS Design Group  

NLE Websites -- All DOE Office Websites (Extended Search)

R-593 April 2002 UC-414 Linac Coherent Light Source (LCLS) Conceptual Design Report Published April 2002 Prepared for the Department of Energy under contract number...

453

Industrial experience with design patterns  

Science Conference Proceedings (OSTI)

A design pattern is a particular prose form of recording design information such that designs which have worked well in the past can be applied again in similar situations in the future. The availability of a collection of design patterns can help both ... Keywords: best practices, design information recording, design patterns, design reuse, industrial experience, information sharing, software architecture documentation, software reusability, system documentation

Kent Beck; Ron Crocker; Gerard Meszaros; John Vlissides; James O. Coplien; Lutz Dominick; Frances Paulisch

1996-05-01T23:59:59.000Z

454

A practical generative design method  

Science Conference Proceedings (OSTI)

A generative CAD based design exploration method is proposed. It is suitable for complex multi-criteria design problems where important performance criteria are uncomputable. The method is based on building a genotype of the design within a history based ... Keywords: Computer aided conceptual design, Evolutionary design, Generative design, Parametric design

Sivam Krish

2011-01-01T23:59:59.000Z

455

OpenEI Community - utility rate  

Open Energy Info (EERE)

Rates API Rates API Version 2 is Live! http://en.openei.org/community/blog/utility-rates-api-version-2-live Smart meterAfter several months of development and testing, the next generation web service for the utility rate database is finally here! I encourage you to check out the V2 Utility Rates API at rates">http://en.openei.org/services/doc/rest/util_ratesrates-api-version-2-live" target="_blank">read more

456

Utility Rate | OpenEI Community  

Open Energy Info (EERE)

Utility Rate Utility Rate Home > Utility Rate > Posts by term > Utility Rate Content Group Activity By term Q & A Feeds Term: API Type Term Title Author Replies Last Post sort icon Blog entry API The utility rate database version 1 API is now deprecated Rmckeel 6 Sep 2013 - 14:00 Blog entry API Lighting Electricity Rates on OpenEI Sfomail 31 May 2013 - 12:04 Blog entry API Utility Rates API Version 2 is Live! Sfomail 17 May 2013 - 11:14 Groups Menu You must login in order to post into this group. Recent content There is currently no way to s... ranking of utilities by demand charge? FYI, OpenEI now accommodates t... Very useful information. Thank... The utility rate database version 1 API is now deprecated more Group members (28) Managers: Dloomis

457

Cross-layer wireless bit rate adaptation  

E-Print Network (OSTI)

This paper presents SoftRate, a wireless bit rate adaptation protocol that is responsive to rapidly varying channel conditions. Unlike previous work that uses either frame receptions or signal-to-noise ratio (SNR) estimates ...

Vutukuru, Mythili

2009-01-01T23:59:59.000Z

458

Cross-Layer Wireless Bit Rate Adaptation  

E-Print Network (OSTI)

This paper presents SoftRate, a wireless bit rate adaptation protocol that is responsive to rapidly varying channel conditions. Unlike previous work that uses either frame receptions or signal-to-noise ratio (SNR) estimates ...

Vutukuru, Mythili

459

Transfer Rate vs. I/O Units  

NLE Websites -- All DOE Office Websites (Extended Search)

O Units Transfer Rate vs. IO Units These plots show the transfer rate from the IO benchmarks as a function of the number of elizaio units in use for each particular eliza at the...

460

Cumulus Parameterization and Rainfall Rates I  

Science Conference Proceedings (OSTI)

Modeling of convective rainfall rates is a central problem in tropical meteorology. Toward numerical weather prediction efforts the semi-prognostic approach (i.e., a one time-step prediction of rainfall rates) provides a relevant test of cumulus ...

T. N. Krishnamurti; Y. Ramanathan; Hua-Lu Pan; Richard J. Pasch; John Molinari

1980-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "design kv rating" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Why Oceanic Dissipation Rates Are Not Lognormal  

Science Conference Proceedings (OSTI)

In their derivation of the lognormal probability density function for volume-averaged dissipation rates, Gurvich and Yaglom assumed explicitly that these dissipation rates are statistically homogeneous and that the averaging scale is small ...

Hidekatsu Yamazaki; Rolf Lueck

1990-12-01T23:59:59.000Z

462

A Probability Distribution Model for Rain Rate  

Science Conference Proceedings (OSTI)

A systematic approach is suggested for modeling the probability distribution of rain rate. Rain rate, conditional on rain and averaged over a region, is modeled as a temporally homogeneous diffusion process with appropriate boundary conditions. ...

Benjamin Kedem; Harry Pavlopoulos; Xiaodong Guan; David A. Short

1994-12-01T23:59:59.000Z

463

Rain Rate Estimates from Differential Polarization Measurements  

Science Conference Proceedings (OSTI)

This paper presents an analysis of the accuracy of rain rate estimates from data observed with a radar that has alternating horizontal and vertical polarization. Theoretical accuracies of rain rates from the reflectivity, the differential ...

M. Sachidananda; D. S. Zrni?

1987-12-01T23:59:59.000Z

464

On-site Housing Rates | Staff Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Effective February 1, 2013 Rates for Occupancy < 30-Days Guest House* SingleDouble: 105.00 per day Housekeeping service is provided on all working days. *Alternatives to...

465

CONVERGENCE AND CONVERGENCE RATE OF STOCHASTIC ...  

E-Print Network (OSTI)

gence rate of { ?f(?n)2}n?0 and {f(?n)}n?0 is the slower of the rates O(??rˆ? n. ) (the ...... for ??,s nj ? knj+1. Then ...

466

Geomagnetic Reversals: Rates, Timescales, Preferred Paths,  

E-Print Network (OSTI)

Geomagnetic Reversals: Rates, Timescales, Preferred Paths, Statistical Models and Simulations: Geomagnetic reversals, Reversal rates, Paleointensity, Statistics of Geodynamo September 30, 2001 #12;Abstract Paleomagnetic data on geomagnetic reversals are divided into two general categories: times of occurrence

Constable, Catherine G.

467

Rio Grande Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sales Rate History Updated: 1022009 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) R5-F1 1940 - 1949 3.000 - 8.000 (declining...

468

Collbran Project Power Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Sales Rate History Updated: 1022009 Rate Schedule Effective Dates Energy (MillskWh) Capacity (kW-mo.) Combined (MillskWh) Contract 1262 - 1283 (Firm Only) (Nonfirm...

469

Design of passive decay heat removal system for the lead cooled flexible conversion ratio fast reactor  

E-Print Network (OSTI)

The lead-cooled flexible conversion ratio fast reactor shows many benefits over other fast-reactor designs; however, the higher power rating and denser primary coolant present difficulties for the design of a passive decay ...

Whitman, Joshua (Joshua J.)

2007-01-01T23:59:59.000Z

470

The design of a compact integral medium size PWR : the CIRIS  

E-Print Network (OSTI)

The International Reactor Innovative and Secure (IRIS) is an advanced medium size, modular integral light water reactor design, rated currently at 1000 MWt. IRIS design has been under development by over 20 organizations ...

Shirvan, Koroush

2010-01-01T23:59:59.000Z

471

Energy manager design for microgrids  

E-Print Network (OSTI)

Energy Manager Design for Microgrids Hillier, F. , and G.Energy Manager Design for Microgrids Appendix A: Smart*DER:Manager Design for Microgrids Prepared for the California

Firestone, Ryan; Marnay, Chris

2005-01-01T23:59:59.000Z

472

Life-Changing Drug Design  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities are aimed at designing more effective drugs with fewer side effects. Life-Changing Drug Design One notable example is vemurafenib, a drug designed by...

473

Investigation of component failure rates for pulsed versus steady state tokamak operation  

Science Conference Proceedings (OSTI)

This report presents component failure rate data sources applicable to magnetic fusion systems, and defines multiplicative factors to adjust these data for specific use on magnetic fusion experiment designs. The multipliers address both long pulse and steady state tokamak operation. Thermal fatigue and radiation damage are among the leading reasons for large multiplier values in pulsed operation applications. Field failure rate values for graphite protective tiles are presented, and beryllium tile failure rates in laboratory testing are also given. All of these data can be used for reliability studies, safety analyses, design tradeoff studies, and risk assessments.

Cadwallader, L.C.

1992-07-01T23:59:59.000Z

474

PowerChoice Residential Customer Response to TOU Rates  

Science Conference Proceedings (OSTI)

Research Into Action, Inc. and the Sacramento Municipal Utility District (SMUD) worked together to conduct research on the behaviors and energy use patterns of SMUD residential customers who voluntarily signed on to a Time-of-Use rate pilot launched under the PowerChoice label. The project was designed to consider the how and why of residential customers ability and willingness to engage in demand reduction behaviors, and to link social and behavioral factors to observed changes in demand. The research drew on a combination of load interval data and three successive surveys of participating households. Two experimental treatments were applied to test the effects of increased information on households ability to respond to the Time-of-Use rates. Survey results indicated that participants understood the purpose of the Time-of-Use rate and undertook substantial appropriate actions to shift load and conserve. Statistical tests revealed minor initial price effects and more marked, but still modest, adjustments to seasonal rate changes. Tests of the two information interventions indicated that neither made much difference to consumption patterns. Despite the lackluster statistical evidence for load shifting, the analysis points to key issues for critical analysis and development of residential Time-of-Use rates, especially pertinent as California sets the stage for demand response in more California residences.

Peters, Jane S.; Moezzi, Mithra; Lutzenhiser, Susan; Woods, James; Dethman, Linda; Kunkle, Rick

2009-10-01T23:59:59.000Z

475

PRECEDENTS FOR AUTHORIZATION OF CONTENTS USING DOSE RATE MEASUREMENTS  

SciTech Connect

For the transportation of Radioactive Material (RAM) packages, the requirements for the maximum allowed dose rate at the package surface and in its vicinity are given in Title 10 of the Code of Federal Regulations, Section 71.47. The regulations are based on the acceptable dose rates to which the public, workers, and the environment may be exposed. As such, the regulations specify dose rates, rather than quantity of radioactive isotopes and require monitoring to confirm the requirements are met. 10CFR71.47 requires that each package of radioactive materials offered for transportation must be designed and prepared for shipment so that under conditions normally incident to transportation the radiation level does not exceed 2 mSv/h (200 mrem/h) at any point on the external Surface of the package, and the transport index does not exceed 10. Before shipment, the dose rate of the package is determined by measurement, ensuring that it conforms to the regulatory limits, regardless of any analyses. This is the requirement for all certified packagings. This paper discusses the requirements for establishing the dose rates when shipping RAM packages and the precedents for meeting these requirements by measurement.

Abramczyk, G.; Bellamy, S.; Nathan, S.; Loftin, B.

2012-06-05T23:59:59.000Z

476

Reproduction Rates for 1990–2002 and Intrinsic Rates for 2000–2001: United States  

E-Print Network (OSTI)

Objective—This report presents revised rates of reproduction for 1990–93, reproduction rates for 1994–2002, and intrinsic rates for 2000–2001. The revised rates for 1991–93 are based on populations consistent with the April 1, 2000, census, as are the rates for 1994–2002. Methods—Tabular and graphic data on the reproduction and intrinsic rates by race and Hispanic origin of mother are presented and described. Results—Rates of reproduction (total fertility, gross reproduction, and net reproduction rates), the intrinsic rate of natural increase, and the intrinsic birth rate were lower in 2001 (and 2002) than 1990. Among the race and Hispanic subgroups, the reproduction rates were lower for all groups except Cubans and whites (total). The overall intrinsic death rate increased between 1990 and 2001 with the rate declining for whites (total) but increasing for blacks (total).

Brady E. Hamilton, Ph.D.; Division Of Vital Statistics

2004-01-01T23:59:59.000Z

477

Effects of Sequence Partitioning on Compression Rate  

E-Print Network (OSTI)

In the paper, a theoretical work is done for investigating effects of splitting data sequence into packs of data set. We proved that a partitioning of data sequence is possible to find such that the entropy rate at each subsequence is lower than entropy rate of the source. Effects of sequence partitioning on overall compression rate are argued on the bases of partitioning statistics, and then, an optimization problem for an optimal partition is defined to improve overall compression rate of a sequence.

Alagoz, B Baykant

2010-01-01T23:59:59.000Z

478

Science & Technology Principal Directo rate – Industrial ...  

Erik Stenehjem Science & Technology Principal Directo rate – Industrial Partnerships Office Erik Stenehjem Director----Roger Werne Deputy Director

479

Design and construction of the SMUDPV2 1-MW photovoltaic power plant. Final report I  

Science Conference Proceedings (OSTI)

The Sacramento Municipal Utility District (SMUD), with cofunding from the US Department of Energy (DOE), has designed, procured, installed, and initiated operation of an additional nominal 1000 kilowatt power generating facility as the second phase of its photovoltaic power plant project. The facility converts solar energy directly into electricity using flat plate photovoltaic modules which are mounted on modular single-axis tracking structures. The facility is located adjacent to the Rancho Seco Nuclear Generating Station, southeast of Sacramento, California. Design work for the second phase began in 1983 and the plant began operation in December 1985. Direct current power from the multiple tracking structures is converted to 12.47-kV alternating current power by solid state power conditioning equipment. Overall conversion efficiency, sunlight to utility grid power, is predicted to be between 8 and 10 percent. The plant is expected to generate 2.6 million kWh annually. The capital cost of the plant was $10.9 million.

Henss, R.R.; Hooker, D.W.

1986-05-01T23:59:59.000Z

480