Powered by Deep Web Technologies
Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Deploying Innovation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Innovation Deploying Innovation FCI deploys Laboratory technology for enhanced economic impact regionally and nationally. We offer both negotiable and non-negotiable license...

2

FIELD DEPLOYMENT EVALUATION OF THE FREEZE-THAW/EVAPORATION (FTE) PROCESS TO TREAT OIL AND GAS PRODUCED WATERS. Task 45. Final topical report  

SciTech Connect (OSTI)

TASK 45 FIELD DEPLOYMENT EVALUATION OF THE FREEZE-THAW/ EVAPORATION (FTE ) PROCESS TO TREAT OIL AND GAS PRODUCED WATERS coupling evaporation with freezing. This offers operators a year- round method for treating produced water. Treating water with the FTE process reduces the volume of water to be disposed of as well as purifying the water to a level acceptable for watering livestock and agricultural lands. This process is currently used at two evaporation facilities, one in the San Juan Basin in New Mexico and one in the Green River Basin in Wyoming. the freezing point below that of pure water. When such a solution is cooled below 32EF, relatively pure ice crystals form, along with an unfrozen brine solution that contains elevated concentrations of salts. Because of the brine's high concentration of these constituents, its density is greater than that of the ice, and the purified ice and brine are easily separated. Coupling the natural processes of freezing and evaporation makes the FTE process a more cost- effective and efficient method for the treatment and disposal of produced water and allows for year-round operation of an FTE facility. drops below 32 F, produced water is automatically pumped from a holding pond and sprayed onto a freezing pad. The freezing pad consists of an elevated framework of piping with regularly placed, upright, extendable spray heads similar to those used to irrigate lawns. As the spray freezes, an ice pile forms over the elevated framework of pipes, and the brine, with an elevated constituent concentration, drains from the ice pile. The high-salinity brine, identified by its high electrical conductivity, is separated using automatic valves and pumped to a pond where it can subsequently be disposed of by conventional methods. As the ice pile increases in height, the sprayers are extended. When the ice on the freezing pad melts, the relatively pure water is pumped from the freezing pad and discharged or stored for later use . No new wastes are generated by the FTE process. and the U. S. Department of Energy has been conducted since 1992 to develop a commercial FTE purification process for produced waters. Numeric process and economic modeling, as well as the laboratory-scale process simulation that confirmed the technical and economic feasibility of the process, was performed by B. C. Technologies, Ltd., and the University of North Dakota Energy & Environmental Research Center (EERC) from 1992 to 1995. They then conducted a field evaluation from 1995 to 1997 in New Mexico's San Juan Basin at a conventional evaporation facility operated by Amoco Production Company. The results of this evaluation confirmed that the FTE process has significant commercial economic potential. A new facility was designed in 1998, and its construction is expected to begin in 1999.

Ames A. Grisanti; James A. Sorensen

1999-05-01T23:59:59.000Z

3

SLUDGE BATCH 7B GLASS VARIABILITY STUDY  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) is preparing to initiate processing Sludge Batch 7b (SB7b). In support of the upcoming processing, the Savannah River National Laboratory (SRNL) provided a recommendation to utilize Frits 418 with a 6% Na{sub 2}O addition (26 wt% Na{sub 2}O in sludge) and 702 with a 4% Na{sub 2}O addition (24 wt% Na{sub 2}O in sludge) to process SB7b. This recommendation was based on assessments of the compositional projections for SB7b available at the time from the Savannah River Remediation (SRR). To support qualification of SB7b, SRNL executed a variability study to assess the applicability of the current durability models for SB7b. The durability models were assessed over the expected composition range of SB7b, including potential caustic additions, combined with Frits 702 and 418 over a 32-40% waste loading (WL) range. Thirty four glasses were selected based on Frits 418 and 702 coupled with the sludge projections with an additional 4-6% Na{sub 2}O to reflect the potential caustic addition. Six of these glasses, based on average nominal sludge compositions including the appropriate caustic addition, were developed for both Frit 418 and Frit 702 at 32, 36 and 40% WL to provide coverage in the center of the anticipated SB7b glass region. All glasses were fabricated and characterized using chemical composition analysis, X-ray diffraction (XRD) and the Product Consistency Test (PCT). To comply with the DWPF Glass Product Control Program, a total of thirty four glasses were fabricated to assess the applicability of the current DWPF PCCS durability models. Based on the measured PCT response, all of the glasses were acceptable with respect to the Environmental Assessment (EA) benchmark glass regardless of thermal history. The NL[B] values of the SB7b variability study glasses were less than 1.99 g/L as compared to 16.695 g/L for EA. A small number of the D-optimally selected 'outer layer' extreme vertices (EV) glasses were not predictable using the current Product Composition Control System (PCCS) models for durability, but were acceptable compared to the EA glass when tested. These glasses fell outside of the lower 95% confidence band, which demonstrates conservatism in the model. A few of the glasses fell outside of the upper 95% confidence band; however, these particular glasses have normalized release values that were much lower than the values of EA and should be of no practical concern. Per the requirements of the DWPF Glass Product Control Program, the PCCS durability models have been shown to be applicable to the SB7b sludge system with a range of Na{sub 2}O concentrations blended with Frits 418 or 702. PCT results from the glasses fabricated as part of the variability study were shown to be predictable by the current DWPF PCCS models and/or acceptable with respect to the EA benchmark glass regardless of thermal history or compositional view.

Johnson, F.; Edwards, T.

2011-10-25T23:59:59.000Z

4

Climate Zone 7B | Open Energy Information  

Open Energy Info (EERE)

B B Jump to: navigation, search A type of climate defined in the ASHRAE 169-2006 standard consisting of Climate Zone Number 7 and Climate Zone Subtype B. Climate Zone 7A is defined as Very Cold with IP Units 9000 < HDD65ºF ≤ 12600 and SI Units 5000 < HDD18ºC ≤ 7000 . The following places are categorized as class 7B climate zones: Clear Creek County, Colorado Grand County, Colorado Gunnison County, Colorado Hinsdale County, Colorado Jackson County, Colorado Lake County, Colorado Lincoln County, Wyoming Mineral County, Colorado Park County, Colorado Pitkin County, Colorado Rio Grande County, Colorado Routt County, Colorado San Juan County, Colorado Sublette County, Wyoming Summit County, Colorado Teton County, Wyoming Retrieved from "http://en.openei.org/w/index.php?title=Climate_Zone_7B&oldid=2161

5

NREL: Energy Systems Integration - Integrated Deployment Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Deployment Workshop Integrated Deployment Workshop The Energy Systems Integration Facility workshop, Integrated Deployment, was held August 21 - 23, 2012 at the National Renewable Energy Laboratory in Golden, Colorado. Each day of the workshop, which included a tour of the Energy Systems Integration Facility, focused on a different topic: Day 1: Utility-Scale Renewable Integration Day 2: Distribution-Level Integration Day 3: Isolated and Islanded Grid Systems The agenda and presentations from the workshop are below. Agenda Energy Systems Integration Facility Overview ESIF Technology Partnerships Integrated Deployment Model Integrated Deployment and the Energy Systems Integration Facility: Workshop Proceedings Printable Version Energy Systems Integration Home Research & Development

6

Technology Deployment List | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Technology Deployment List Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Technology Deployment List Agency/Company /Organization: Federal Energy Management Program Sector: Energy Focus Area: Renewable Energy Phase: Create a Vision Topics: Implementation User Interface: Website Website: www1.eere.energy.gov/femp/technologies/newtechnologies_matrix.html#cat OpenEI Keyword(s): EERE tool, Technology Deployment List Language: English References: Technology Deployment List[1] Identify emerging-and underused-energy-saving technologies, including building envelope; heating, ventilation, and air conditioning; lighting; water heating; and refrigeration, computer power management, and vending

7

AMF Deployment, Manacapuru, Brazil  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manacapuru, Brazil Manacapuru Deployment AMF Home Manacapuru Home GOAMAZON Website Experiment Planning Abstract and Related Campaigns Science Plan (PDF, 1.4MB) Deployment...

8

AMF Deployment, Hyytiala, Finland  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hyytil, Finland Hyytil Deployment AMF Home Hyytil Home Experiment Planning Abstract and Related Campaigns Science Plan Deployment Operations Baseline Instruments and...

9

WINDExchange: Deployment Activities  

Wind Powering America (EERE)

Development Siting Deployment Activities Recent years have seen major growth in wind energy, and deployment projections indicate this trend will continue for all parts of the...

10

NREL: Technology Deployment - Integrated Deployment Model  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Integrated Deployment Model Integrated Deployment Model NREL's integrated deployment model provides a framework to focus on the national goal of accelerating market adoption of clean energy technologies through local efforts. With support from the U.S. Department of Energy (DOE), NREL developed and applies the integrated deployment model to select projects including disaster recovery, statewide activities, federal agency support, island activities, and community renewable energy deployment. How the Model Works To address the complex challenges of multi-technology, multi-stakeholder, and multi-fuel deployment, NREL created the integrated deployment model to support each technology area separately but also consider the integration points between the technologies. NREL also identifies the cross-cutting

11

Texas - RRC District 7B Crude Oil + Lease Condensate Estimated...  

U.S. Energy Information Administration (EIA) Indexed Site

Estimated Production from Reserves (Million Barrels) Texas - RRC District 7B Crude Oil + Lease Condensate Estimated Production from Reserves (Million Barrels) Decade Year-0 Year-1...

12

Vehicle Technologies Office: Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment Deployment Site Map Printable Version Share this resource Send a link to Vehicle Technologies Office: Deployment to someone by E-mail Share Vehicle Technologies Office: Deployment on Facebook Tweet about Vehicle Technologies Office: Deployment on Twitter Bookmark Vehicle Technologies Office: Deployment on Google Bookmark Vehicle Technologies Office: Deployment on Delicious Rank Vehicle Technologies Office: Deployment on Digg Find More places to share Vehicle Technologies Office: Deployment on AddThis.com... Energy Policy Act (EPAct) Clean Cities Educational Activities Deployment Our nation's energy security depends on the efficiency of our transportation system and on which fuels we use. Transportation in the United States already consumes much more oil than we produce here at home

13

Data:076f7b57-3f48-4607-a7f7-b18f7b7a1144 | Open Energy Information  

Open Energy Info (EERE)

-3f48-4607-a7f7-b18f7b7a1144 -3f48-4607-a7f7-b18f7b7a1144 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2012/05/01 End date if known: Rate name: RESIDENTIAL SERVICE - ENERGY EFFICIENT SINGLE PHASE(EE-1) Sector: Residential Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative subject to the Cooperative's established Service Rules and Regulations and applicability stated herein. APPLICABILITY: This Schedule is applicable to individual residential consumers in residences, mobile homes, or individually metered apartments who meet all-electric and thermal requirements of this Schedule.

14

Deployment of Emerging Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the FUPWG Deployment of Emerging Technologies. Presented by Brad Gustafson, Department of Energy, held on November 1, 2006.

15

IEA Renewable Energy Technology Deployment | Open Energy Information  

Open Energy Info (EERE)

IEA Renewable Energy Technology Deployment IEA Renewable Energy Technology Deployment Jump to: navigation, search Name IEA Renewable Energy Technology Deployment Agency/Company /Organization International Energy Agency - Renewable Energy Technology Deployment Implementing Agreement Sector Energy Focus Area Renewable Energy Topics Policies/deployment programs Resource Type Publications Website http://www.iea-retd.org Country Canada, Norway, Denmark, Germany, Netherlands, France, United Kingdom, Ireland, Japan Northern America, Northern Europe, Northern Europe, Western Europe, Western Europe, Western Europe, Northern Europe, Northern Europe, Eastern Asia References RETD Homepage [1] This article is a stub. You can help OpenEI by expanding it. "RETD Implementing Agreement is one of the key outcomes from the

16

ALIGNMENT, LEVELING AND DEPLOYMENT CONSTRAINTS  

E-Print Network [OSTI]

Thermoelectric Generator (RTG) Crew Deployment Description Passive Seismic Experiment (PSE) Crew Deployment and Alignment Central Station Antenna Crew Deployment Description Leveling, Alignment, and Pointing Radioisotope

Rathbun, Julie A.

17

Solar Deployment and Policy  

Gasoline and Diesel Fuel Update (EIA)

Solar Deployment and Policy Justin Baca Director of Research Solar Energy Industries Association About SEIA * Founded in 1974 * U.S. National Trade Association for Solar Energy *...

18

Technology Deployment List  

Broader source: Energy.gov [DOE]

Spreadsheet details new and underutilized technologies ranked for Federal deployment by the Federal Energy Management Program. The list was last updated in 2012.

19

Integrated Technology Deployment  

Office of Energy Efficiency and Renewable Energy (EERE)

Integrated technology deployment is a comprehensive approach to implementing solutions that increase the use of energy efficiency and renewable energy technologies. Federal, state, and local...

20

Regional Energy Deployment System (ReEDS) | Open Energy Information  

Open Energy Info (EERE)

Regional Energy Deployment System (ReEDS) Regional Energy Deployment System (ReEDS) (Redirected from Regional Energy Deployment System) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Regional Energy Deployment System Agency/Company /Organization: NREL Sector: Energy Topics: Pathways analysis, Resource assessment Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.nrel.gov/analysis/reeds/ OpenEI Keyword(s): EERE tool, Regional Energy Deployment System, ReEDS References: Regional Energy Deployment System (ReEDS) Web site[1] Regional Energy Deployment System (ReEDS) is a multiregional, multitimeperiod, Geographic Information System (GIS), and linear programming model of capacity expansion in the electric sector of the United States. The model, developed by NREL's Strategic Energy Analysis

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Remotely Deployed Virtual Sensors  

E-Print Network [OSTI]

Remotely Deployed Virtual Sensors TR-UTEDGE-2007-010 Sanem Kabadayi Christine Julien © Copyright 2007 The University of Texas at Austin #12;Remotely Deployed Virtual Sensors Sanem Kabadayi that run on mobile client devices connect to the sensors of a multihop sensor network. For emerging

Julien, Christine

22

China-International Industrial Energy Efficiency Deployment Project | Open  

Open Energy Info (EERE)

China-International Industrial Energy Efficiency Deployment Project China-International Industrial Energy Efficiency Deployment Project Jump to: navigation, search Name China-International Industrial Energy Efficiency Deployment Project Agency/Company /Organization United States Department of Energy (USDOE), Institute for Sustainable Communities (ISC), Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory (ORNL), Alliance for Energy Efficient Economy (India), Confederation of Indian Industry Sector Energy Focus Area Industry Topics Implementation, Low emission development planning, Technology characterizations Program Start 2011 Program End 2013 Country China Eastern Asia References International Industrial Energy Efficiency Deployment Project[1] Overview China "China is prioritizing a low carbon, energy efficient economy and has

23

International Industrial Energy Efficiency Deployment Project | Open Energy  

Open Energy Info (EERE)

Industrial Energy Efficiency Deployment Project Industrial Energy Efficiency Deployment Project Jump to: navigation, search Name International Industrial Energy Efficiency Deployment Project Agency/Company /Organization United States Department of Energy (USDOE), Institute for Sustainable Communities (ISC), Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory (ORNL), Alliance for Energy Efficient Economy (India), Confederation of Indian Industry Sector Energy Focus Area Industry Topics Implementation, Low emission development planning, Technology characterizations Program Start 2011 Program End 2013 Country China, India Eastern Asia, Southern Asia References International Industrial Energy Efficiency Deployment Project[1] Overview China "China is prioritizing a low carbon, energy efficient economy and has

24

Deployable Swimming Pool Enclosures  

Science Journals Connector (OSTI)

Deployable enclosures for indoor swimming pools facilities are a common need nowadays. Swimming, a common sport activity concerning overall physical ... climate, especially in cold and windy weather. Swimming pool

E. Karni

2000-01-01T23:59:59.000Z

25

Electric Vehicle Charging Infrastructure Deployment Guidelines: British  

Open Energy Info (EERE)

Electric Vehicle Charging Infrastructure Deployment Guidelines: British Electric Vehicle Charging Infrastructure Deployment Guidelines: British Columbia Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Electric Vehicle Charging Infrastructure Deployment Guidelines: British Columbia Agency/Company /Organization: Natural Resources Canada, British Columbia Hydro and Power Authority Focus Area: Vehicles Topics: Best Practices Website: www.bchydro.com/etc/medialib/internet/documents/environment/EVcharging A major component of winning public acceptance for plug-in vehicles is the streamlining of the private electric vehicle charging or supply equipment permitting and installation process as well as the public and commercial availability of charging locations. These guidelines are intended to anticipate the questions and requirements to ensure customer satisfaction.

26

Title. ATP7B copper-regulated traffic and association with the tight junctions: copper excretion into Short title. ATP7B and copper excretion by liver  

E-Print Network [OSTI]

1 Title. ATP7B copper-regulated traffic and association with the tight junctions: copper excretion into the bile Short title. ATP7B and copper excretion by liver Authors. Sonia Hernandez*§ , Yo Tsuchiya manuscript Gastroenterology 2008;134(4):1215-23 #12;2 Abstract The copper transporter ATP7B plays a central

Boyer, Edmond

27

Regional Energy Deployment System (ReEDS) | Open Energy Information  

Open Energy Info (EERE)

Regional Energy Deployment System (ReEDS) Regional Energy Deployment System (ReEDS) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Regional Energy Deployment System Agency/Company /Organization: NREL Sector: Energy Topics: Pathways analysis, Resource assessment Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.nrel.gov/analysis/reeds/ OpenEI Keyword(s): EERE tool, Regional Energy Deployment System, ReEDS References: Regional Energy Deployment System (ReEDS) Web site[1] Regional Energy Deployment System (ReEDS) is a multiregional, multitimeperiod, Geographic Information System (GIS), and linear programming model of capacity expansion in the electric sector of the United States. The model, developed by NREL's Strategic Energy Analysis Center (SEAC), is designed to conduct analysis of the critical energy

28

Technology Deployment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deployment Deployment Technology Deployment October 8, 2013 - 2:43pm Addthis The Federal Energy Management Program's (FEMP) Technology Deployment program provides the Federal Government and commercial building sector with unbiased information and guidance about energy-efficient and renewable energy technologies available for deployment. Specifically, this program: Identifies technologies that have high potential energy savings and cost benefits and are ready for rapid deployment Develops and conducts deployment campaigns to raise awareness about energy technologies of the highest priority Educates Federal agencies and the commercial buildings sector about targeted energy-efficient technologies. Learn about: Technology Deployment List: Read about new and underutilized

29

Deployment Commitments | Department of Energy  

Energy Savers [EERE]

actions to advance solar energy deployment. These commitments represent more than 350 private and public sector commitments to deploy 885 megawatts of solar electricity....

30

Demonstration and Deployment Strategy Workshop | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Demonstration and Deployment Strategy Workshop Demonstration and Deployment Strategy Workshop The Bioenergy Technologies Office's (BETO's) Demonstration and Deployment Strategy...

31

Property:ProgramTopics | Open Energy Information  

Open Energy Info (EERE)

ProgramTopics ProgramTopics Jump to: navigation, search This is a page of String. Pages using the property "ProgramTopics" Showing 25 pages using this property. (previous 25) (next 25) 2 2008 Solar Technologies Market Report + Market analysis +, Resource assessment + 2010 Carbon Sequestration Atlas of the United States and Canada: Third Edition + Potentials & Scenarios + 2010 Solar Market Transformation Analysis and Tools + Market analysis +, Pathways analysis +, Technology characterizations + 2010 Vehicle Technologies Market Report + Deployment Data + A A Case for Climate Neutrality: Case Studies on Moving Towards a Low Carbon Economy + Implementation +, Low emission development planning + A Compendium of Utility-Sponsored Energy-Efficient Rebate Programs + Policy +, Deployment +, & Program Impact +

32

AMF Deployment, Oliktok, Alaska  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alaska Alaska Oliktok Deployment AMF Home Oliktok Home Deployment Operations Baseline Instruments and Data Plots at the Archive Outreach News & Press New Sites Fact Sheet (PDF, 1.6MB) Images Contacts Fred Helsel, AMF Operations Lynne Roeder, Media Contact Hans Verlinde, Principal Investigator AMF Deployment, Oliktok Point, Alaska This view shows the location of the Oliktok, Alaska, ARM Mobile Facility. Located at the North Slope of Alaska on the coast of the Arctic Ocean, Oliktok Point is extremely isolated, accessible only by plane. From this remote spot researchers now have access to important data about Arctic climate processes at the intersection of land and sea ice. As of October 2013, Oliktok Point is the temporary home of ARM's third and newest ARM Mobile Facility, or AMF3.

33

Remote Systems Design & Deployment  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory (PNNL) was tasked by Washington River Protection Solutions, LLC (WRPS) to provide information and lessons learned relating to the design, development and deployment of remote systems, particularly remote arm/manipulator systems. This report reflects PNNLs experience with remote systems and lays out the most important activities that need to be completed to successfully design, build, deploy and operate remote systems in radioactive and chemically contaminated environments. It also contains lessons learned from PNNLs work experiences, and the work of others in the national laboratory complex.

Bailey, Sharon A.; Baker, Carl P.; Valdez, Patrick LJ

2009-08-28T23:59:59.000Z

34

Deployment & Market Transformation (Brochure)  

SciTech Connect (OSTI)

NREL's deployment and market transformation (D and MT) activities encompass the laboratory's full range of technologies, which span the energy efficiency and renewable energy spectrum. NREL staff educates partners on how they can advance sustainable energy applications and also provides clients with best practices for reducing barriers to innovation and market transformation.

Not Available

2012-04-01T23:59:59.000Z

35

Missile Deployments Roil Europe  

Science Journals Connector (OSTI)

...reductions in the nuclear arma-ments...Europe-an terrorism. In Europe...existing overall nuclear balance between...INATO's plant to deploy...preemptive attack in the midst...of a Soviet attack on Western...few Soviet nuclear weapons were...cities at risk in or-der...other superior power, but also...

R. JEFFREY SMITH

1984-01-27T23:59:59.000Z

36

Missile Deployments Roil Europe  

Science Journals Connector (OSTI)

...install new nuclear missiles in...reductions in the nuclear arma-ments...Europe-an terrorism. In Europe...existing overall nuclear balance between...INATO's plant to deploy...preemptive attack in the midst...international security affairs office...cities at risk in or-der...other superior power, but also...

R. JEFFREY SMITH

1984-01-27T23:59:59.000Z

37

Integrated Deployment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Integrated Deployment Integrated Deployment Integrated Deployment Integrated technology deployment uses a comprehensive approach to implement a variety of efficiency and renewable energy technology solutions in communities and cities, federal agencies, international locations, and states and territories. need_alt Community Renewable Energy Deployment Webinars Hear about successful community renewable energy projects, including the challenges and barriers faced during development. Learn more Integrated Deployment Projects The following projects provide examples of how the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory have used an integrated approach to address various location-specific energy challenges that is both scalable and replicable around the world:

38

Deployment of Emerging Technologies  

Broader source: Energy.gov (indexed) [DOE]

Deployment of Emerging Deployment of Emerging Technologies FUPWG November 1, 2006 Brad Gustafson Department of Energy Progress To Date: Federal Standard Buildings 80,000 85,000 90,000 95,000 100,000 105,000 110,000 115,000 120,000 125,000 130,000 135,000 140,000 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 FISCAL YEAR Btu per Gross Square Foot 10% Goal - 1995 (NECPA) 20% Goal - 2000 (EPACT 1992) 30% Goal - 2005 (EO 12902) 35% Goal - 2010 (EO 13123) 29.6% Reduction, 2005 (Preliminary Data) Actual Energy Use Annual Goals (EPACT 2005) Although the Federal Government narrowly missed the 2005 goal, it is on track to meet the 2010 goal * To identify promising emerging technologies and accelerate deployment in Federal sector - Meet the Federal Energy Goals - Lead by Example

39

Energy Information Administration - Energy Efficiency-table 7b.  

Gasoline and Diesel Fuel Update (EIA)

b b Table 7b. Offsite-Produced Fuel Consumption per Ton of Steel, 1998, 2002, and 2006 (1000 Btu per ton) MECS Survey Years Iron and Steel Mills (NAICS1331111) 1998 2 2002 3 20063 Total NA 11,886 9,210 Electricity NA 2,315 2,152 Natural Gas NA 4,855 4,009 Coal NA 450 172 Residual Fuel NA 13 234 Coke and Breeze NA 3,916 2,287 Notes:1. The North American Industry Classification System (NAICS) has replaced the Standard Industrial Classification (SIC) system. NAICS 331111 includes steel works, blast furnaces (including coke ovens), and rolling mills. 2. 1998 data unavailable due to disclosure avoidance procedures in place at the time.

40

Customer-Focused Deployment  

Broader source: Energy.gov (indexed) [DOE]

Customer-Focused Customer-Focused Deployment SAM RASHKIN Chief Architect Building Technologies Program February 29, 2012 Building America Meeting 2 | INNOVATION & INTEGRATION: Transforming the Energy Efficiency Market Buildings.Energy.gov 'Good Government' As-A-System IECC Code: Mandates technologies and practices proven reliable and cost- effective ENERGY STAR: Recognizes Builders Who Deliver Significantly Above Code Performance Builders Challenge: Recognizes Leading Builders Applying Proven Innovations and Best Practices Building America: Develops New Innovations and Best Practices 3 | INNOVATION & INTEGRATION: Transforming the Energy Efficiency Market Buildings.Energy.gov Disseminating Research Results: Building America Resource Tool 4 | INNOVATION & INTEGRATION: Transforming the Energy Efficiency Market

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

ARM - News from the Hyytil, Finland, Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FinlandNews from the Hyytil, Finland, Deployment Hyytil Deployment AMF Home Hyytil Home Experiment Planning Abstract and Related Campaigns Science Plan Deployment...

42

Vehicle Technologies Office: Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment Deployment Our nation's energy security depends on the efficiency of our transportation system and on which fuels we use. Transportation in the United States already consumes much more oil than we produce here at home and the situation is getting worse. Domestic oil production has been dropping steadily for over 20 years, and experts predict that by 2025, about 70% of our oil will be imported. The U.S. Department of Energy's (DOE's) Vehicle Technologies Office supports research and development (R&D) that will lead to new technologies that reduce our nation's dependence on imported oil, further decrease vehicle emissions, and serve as a bridge from today's conventional powertrains and fuels to tomorrow's hydrogen-powered hybrid fuel cell vehicles. The Vehicle Technologies Office also supports implementation programs that help to transition alternative fuels and vehicles into the marketplace, as well as collegiate educational activities to help encourage engineering and science students to pursue careers in the transportation sector. Following are some of the activities that complement the Vehicle Technologies Office's mission.

43

Federal Technology Deployment Pilot: Exterior Solid State Lighting  

Broader source: Energy.gov (indexed) [DOE]

Federal Technology Deployment Federal Technology Deployment Pilot: Exterior Solid State Lighting Jeff McCullough, LC October 24, 2011 Pacific Northwest National Laboratory Richland, Washington 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov * Overview of DOE's Solid-State Lighting Program * Federal Technology Deployment Pilot: Exterior Solid State Lighting * FEMP Technology Deployment Matrix This Morning's Topics 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Energy Savings Potential of Solid-State Lighting SSL Multi-Year Program Plan, May 2011: http://apps1.eere.energy.gov/buildings/publications/pdfs/ssl/ssl_mypp2011_web.pdf 4 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov A Market in Motion * Tsunami of new products coming to market * Significant learning curve for

44

NREL: Technology Deployment - Solar Deployment and Market Transformation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Deployment and Market Transformation Solar Deployment and Market Transformation NREL enables faster, easier, and less expensive solar installations by applying our expertise and knowledge to projects that addresses challenges, inefficiencies, and market barriers to solar technology deployment. Northeast Denver Housing Center Solarize Grassroots Movement Drives Down Solar Prices 30% in Portland, Oregon Solarize Northeast Denver Housing Center NREL Identifies PV for 28 Affordable Housing Units Our technical experts work with policymakers, program administrators, regulators, utilities, transmission organizations, technology developers, financial organizations, and insurance companies to help break down barriers to solar technology deployment by: Developing and delivering policy and market design trainings

45

Solar Photovoltaic Financing: Residential Sector Deployment ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solar Photovoltaic Financing: Residential Sector Deployment Solar Photovoltaic Financing: Residential Sector Deployment This report presents the information that homeowners and...

46

Research, Development, Demonstration, and Deployment  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office's research, development, demonstration, and deployment (RDD&D) efforts are organized around five key technical and three cross-cutting elements. The first two...

47

Accelerating Combined Heat & Power Deployment  

Broader source: Energy.gov (indexed) [DOE]

ACCELERATING COMBINED HEAT & POWER DEPLOYMENT An Industry Consultation by the United States Energy Association August 31, 2011 Cover Photograph: CHP Plant at the Mueller Energy...

48

CHP Deployment | Department of Energy  

Office of Environmental Management (EM)

Business Solution - Increasing efficiency, reducing business costs, and creating green-collar jobs Local Energy Solution - Deployable throughout the United States...

49

Data:1576d36b-80ed-416b-a7b4-a52fffeb7b2d | Open Energy Information  

Open Energy Info (EERE)

80ed-416b-a7b4-a52fffeb7b2d 80ed-416b-a7b4-a52fffeb7b2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: General Service Three Phase Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

50

Data:7c5c38ab-8e7b-40c7-b490-e2981bd14032 | Open Energy Information  

Open Energy Info (EERE)

ab-8e7b-40c7-b490-e2981bd14032 ab-8e7b-40c7-b490-e2981bd14032 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-Mercury vapor-400 watts-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

51

Data:3ca194db-15de-43e0-8f7b-7b00a60b71eb | Open Energy Information  

Open Energy Info (EERE)

db-15de-43e0-8f7b-7b00a60b71eb db-15de-43e0-8f7b-7b00a60b71eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Lighting Service - Signal Light Sector: Lighting Description: Available system wide to all security, street, and signal lighting. Additional charge if transformer is required - $3.23 monthly. Additional charge if service and pole are required - $1.08. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

52

Texas--RRC District 7B Coalbed Methane Proved Reserves (Billion...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

company data. Release Date: 1242014 Next Release Date: 12312015 Referring Pages: Coalbed Methane Proved Reserves as of Dec. 31 TX, RRC District 7B Coalbed Methane Proved...

53

Texas--RRC District 7B Coalbed Methane Production (Billion Cubic...  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

company data. Release Date: 1242014 Next Release Date: 12312015 Referring Pages: Coalbed Methane Estimated Production TX, RRC District 7B Coalbed Methane Proved Reserves,...

54

Deployment of Demand Response as a Real-Time Resource in Organized Markets  

Open Energy Info (EERE)

Deployment of Demand Response as a Real-Time Resource in Organized Markets Deployment of Demand Response as a Real-Time Resource in Organized Markets Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Deployment of Demand Response as a Real-Time Resource in Organized Markets Focus Area: Crosscutting Topics: Potentials & Scenarios Website: www.sciencedirect.com/science/article/pii/S1040619008000973 Equivalent URI: cleanenergysolutions.org/content/deployment-demand-response-real-time- Language: English Policies: "Deployment Programs,Regulations" is not in the list of possible values (Deployment Programs, Financial Incentives, Regulations) for this property. DeploymentPrograms: Technical Assistance Regulations: Resource Integration Planning This article examines the use of demand response as a dispatchable resource

55

Analysis Of The Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7b (SB7b), also referred to as Macrobatch 9 (MB9), in January 2012. SB7b is a blend of the heel of Tank 40 from Sludge Batch 7a (SB7a) and the SB7b material that was transferred to Tank 40 from Tank 51. SB7b was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Form Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Two pour stream glass samples were collected while processing SB7b. The samples were transferred to the Savannah River National Laboratory (SRNL) where one was analyzed and the other was archived. The following conclusions were drawn from the analytical results provided in this report: The sum of oxides for the official SB7b pour stream glass is within the Product Composition Control System (PCCS) limits (95-105 wt%); The average calculated Waste Dilution Factor (WDF) for SB7b is 2.3. In general, the measured radionuclide content of the official SB7b pour stream glass is in good agreement with the calculated values from the Tank 40 dried sludge results from the SB7b Waste Acceptance Program Specification (WAPS) sample; As in previous pour stream samples, ruthenium and rhodium inclusions were detected by Scanning Electron Microscopy-Electron Dispersive Spectroscopy (SEM-EDS) in the SB7b pour stream sample; The Product Consistency Test (PCT) results indicate that the official SB7b pour stream glass meets the waste acceptance criteria for durability with a normalized boron release of 0.8 g/L, which is an order of magnitude less than the Environmental Assessment (EA) glass; The measured density of the SB7b pour stream glass was 2.70 g/cm{sup 3}; The Fe{sup 2+}/?Fe ratio of the SB7b pour stream samples was 0.07.

Johnson, F. C.; Crawford, C. L.; Pareizs, J. M.

2013-11-18T23:59:59.000Z

56

Deploying Emerging Technologies in ESPC  

Broader source: Energy.gov [DOE]

Presentationgiven at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meetingdiscusses emerging technologies and how to deploy them using an energy savings performance contract (ESPC).

57

Rapid deployment intrusion detection system  

SciTech Connect (OSTI)

A rapidly deployable security system is one that provides intrusion detection, assessment, communications, and annunciation capabilities; is easy to install and configure; can be rapidly deployed, and is reusable. A rapidly deployable intrusion detection system (RADIDS) has many potential applications within the DOE Complex: back-up protection for failed zones in a perimeter intrusion detection and assessment system, intrusion detection and assessment capabilities in temporary locations, protection of assets during Complex reconfiguration, and protection in hazardous locations, protection of assets during Complex reconfiguration, and protection in hazardous locations. Many DOE user-need documents have indicated an interest in a rapidly deployable intrusion detection system. The purpose of the RADIDS project is to design, develop, and implement such a system. 2 figs.

Graham, R.H.

1997-08-01T23:59:59.000Z

58

Strategies to Finance Large-Scale Deployment of Renewable Energy Projects:  

Open Energy Info (EERE)

Strategies to Finance Large-Scale Deployment of Renewable Energy Projects: Strategies to Finance Large-Scale Deployment of Renewable Energy Projects: An Economic Development and Infrastructure Approach Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Strategies to Finance Large-Scale Deployment of Renewable Energy Projects: An Economic Development and Infrastructure Approach Agency/Company /Organization: International Energy Agency (IEA) Sector: Energy Focus Area: Renewable Energy Topics: Finance, Implementation, Policies/deployment programs Resource Type: Publications Website: iea-retd.org/archives/publications/finance-re Cost: Free Language: English Strategies to Finance Large-Scale Deployment of Renewable Energy Projects: An Economic Development and Infrastructure Approach Screenshot References: Strategies to Finance Large-Scale Deployment of Renewable Energy Projects: An Economic Development and Infrastructure Approach[1]

59

Conducted Electrical Weapon Deployed Probe Wounds  

Science Journals Connector (OSTI)

Deployment of probes is a common method of use for some handheld conducted electrical weapons (CEWs). Probe deployment allows for greater...

Donald M. Dawes M.D.; Jeffrey D. Ho M.D.

2012-01-01T23:59:59.000Z

60

Electric Drive Vehicle Infrastructure Deployment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Infrastructure Deployment Electric Drive Vehicle Infrastructure Deployment 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer...

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Community Renewable Energy Deployment Provides Replicable Examples...  

Office of Environmental Management (EM)

Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy Projects Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy...

62

Chicago Area Alternative Fuels Deployment Project (CAAFDP) |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Meeting arravt061tibingham2012o.pdf More Documents & Publications Chicago Area Alternative Fuels Deployment Project (CAAFDP) Chicago Area Alternative Fuels Deployment Project...

63

Commercial Building Demonstration and Deployment Overview - 2014...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Demonstration and Deployment Overview - 2014 BTO Peer Review Commercial Building Demonstration and Deployment Overview - 2014 BTO Peer Review Presentation: Kristen Taddonio, U.S....

64

Demonstrating and Deploying Integrated Retrofit Technologies...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014 BTO Peer Review Demonstrating and Deploying Integrated Retrofit Technologies and Solutions - 2014...

65

Data:1b171703-7b28-4c7b-8bdc-90b5d8f0d08e | Open Energy Information  

Open Energy Info (EERE)

3-7b28-4c7b-8bdc-90b5d8f0d08e 3-7b28-4c7b-8bdc-90b5d8f0d08e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kootenai Electric Cooperative Effective date: 2012/04/01 End date if known: Rate name: General Service Sector: Commercial Description: Prices reflect the Wholesale Power Cost Adjustment of $0.00414/kWh. Source or reference: http://www.kec.com/documents/rate_schedule_800_general_service_april_12.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

66

Data:E88d9086-a98e-45c7-b7d1-8e38ebb82e7b | Open Energy Information  

Open Energy Info (EERE)

d9086-a98e-45c7-b7d1-8e38ebb82e7b d9086-a98e-45c7-b7d1-8e38ebb82e7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 01 RESIDENTIAL SERVICE-Underground Primary Service Sector: Residential Description: Applicability: To residential use only in single private residences or apartments for lighting, appliances domestic single-phase power with no motor over 5HP, heating and cooling served through one meter. Monthly minimum bill: $30.00 Source or reference: http://www.ed3online.org/view/70 Source Parent:

67

Data:9705b027-7b79-4f5a-8dc1-7b2b2b412107 | Open Energy Information  

Open Energy Info (EERE)

7-7b79-4f5a-8dc1-7b2b2b412107 7-7b79-4f5a-8dc1-7b2b2b412107 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - HPS- 25ft steel 200W Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

68

Data:7fae8f7b-e984-49e7-b9ef-85782ac24893 | Open Energy Information  

Open Energy Info (EERE)

f7b-e984-49e7-b9ef-85782ac24893 f7b-e984-49e7-b9ef-85782ac24893 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: Street Lighting 100w HPS Acorn Utility owned Sector: Lighting Description: Fixture Only $5.00/mo 15 to 16 ft. cast iron, wood or steel... $3.40/month/pole 16ft. aluminum pole ......... $4.50/ month/pole 30ft. fiberglass w/ (1)6` arm ......... $10.50/month/pole 30ft. fiberglass w/ (1) 12` arm ......... $11/month/pole 30ft. fiberglass w/ (2) 12` arm ............ $13/month/pole 30f .steel w/ (1) arm ............ $10/month/pole

69

Deploying Emerging Technologies in ESPC  

Broader source: Energy.gov (indexed) [DOE]

Deploying Emerging Technologies in Deploying Emerging Technologies in ESPC Charles Williams with Mike Holda and Anthony Radspieler Lawrence Berkeley National Laboratory For More Information * Would you like to know more about this presentation? * Charles Williams * Lawrence Berkeley National Laboratory * One Cyclotron Road, MS90R3111 Berkeley CA 94720 * CHWilliams@lbl.gov Deploying Emerging Technologies * Goals/Objective * Define emerging technologies * Examples of emerging technologies in ESPC projects - lessons learned * Describe actions taken to incorporate ET in ESPCs * Results to date * Feedback, suggestions Emerging Technologies in ESPCs Goal/Objective: -Tool to help reach Executive Order 13423, EPACT 2005 and EISA energy use reduction goals -Means to acquire energy savings otherwise not attainable, and build larger

70

AMF Deployment, Black Forest, Germany  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Germany Germany Black Forest Deployment AMF Home Black Forest Home Data Plots and Baseline Instruments CERA COPS Data University of Hohenheim COPS Website COPS Update, April 2009 Experiment Planning COPS Proposal Abstract and Related Campaigns Science Plan (PDF, 12.4M) Outreach COPS Backgrounder (PDF, 306K) Posters AMF Poster, German Vesion Researching Raindrops in the Black Forest News Campaign Images AMF Deployment, Black Forest, Germany Main Site: 48° 32' 24.18" N, 08° 23' 48.72" E Altitude: 511.43 meters In March 2007, the third deployment of the ARM Mobile Facility (AMF) will take place in the Black Forest region of Germany, where scientists will study rainfall resulting from atmospheric uplift (convection) in mountainous terrain, otherwise known as orographic precipitation. ARM

71

Rational Deployment of CSP Heuristics  

E-Print Network [OSTI]

Heuristics are crucial tools in decreasing search effort in varied fields of AI. In order to be effective, a heuristic must be efficient to compute, as well as provide useful information to the search algorithm. However, some well-known heuristics which do well in reducing backtracking are so heavy that the gain of deploying them in a search algorithm might be outweighed by their overhead. We propose a rational metareasoning approach to decide when to deploy heuristics, using CSP backtracking search as a case study. In particular, a value of information approach is taken to adaptive deployment of solution-count estimation heuristics for value ordering. Empirical results show that indeed the proposed mechanism successfully balances the tradeoff between decreasing backtracking and heuristic computational overhead, resulting in a significant overall search time reduction.

Tolpin, David

2011-01-01T23:59:59.000Z

72

Quarterly Nuclear Deployment Scorecard- January 2015  

Broader source: Energy.gov [DOE]

Includes news updates on nuclear power deployment including: vermont yankee closure, possible vogtle construction delay.

73

NREL: Technology Deployment - Clean Cities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Clean Cities Clean Cities NREL assists the U.S. Department of Energy's Clean Cities program in supporting local actions to reduce petroleum use in transportation by providing technical assistance, educational and outreach publications, and coordinator support. Clean Cities is a national network of nearly 100 coalitions that bring together stakeholders in the public and private sectors to deploy alternative and renewable fuels, advanced vehicles, fuel economy improvements, idle-reduction measures, and new transportation technologies as they emerge. Technical Assistance NREL engineers and researchers provide hands-on technical assistance to help Clean Cities coalitions, stakeholders, manufacturers, and fuel providers overcome obstacles to deploying alternative fuels and advanced

74

Technology Deployment List | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deployment » Technology Deployment List Deployment » Technology Deployment List Technology Deployment List October 8, 2013 - 2:44pm Addthis Technology Ranking Criteria Technologies featured in the Technology Deployment List were ranked by: Federal Impact: Combination of energy savings potential and applicability in the Federal market (50% weighting) Cost Effectiveness: Relative cost of the implementation and average expected return typically reported in case studies as simple payback period (30% weighting) Probability of Success: Combination of the qualitative characteristics scored separately and averaged to determine probability of success. Criteria include strength of supply chain, knowledge base, implementation difficulty, and customer acceptance (20% weighting). The Federal Energy Management Program's (FEMP) Technology Deployment List

75

Federal Energy Management Program: Technology Deployment List  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

List to someone by E-mail List to someone by E-mail Share Federal Energy Management Program: Technology Deployment List on Facebook Tweet about Federal Energy Management Program: Technology Deployment List on Twitter Bookmark Federal Energy Management Program: Technology Deployment List on Google Bookmark Federal Energy Management Program: Technology Deployment List on Delicious Rank Federal Energy Management Program: Technology Deployment List on Digg Find More places to share Federal Energy Management Program: Technology Deployment List on AddThis.com... Energy-Efficient Products Technology Deployment Technology Deployment List Solid-State Lighting Working Group Renewable Energy Technology Deployment List Technology Ranking Criteria Technologies featured in the Technology Deployment List were ranked by:

76

HCPV deployment by Aerojet Rocketdyne  

Science Journals Connector (OSTI)

Aerojet Rocketdyne (AR) with essential support from HCPV module supplier Semprius is implementing a HCPV commercialization process by deploying HCPV systems of increasing scope and size. The process is designed to gather field data create learning opportunities and reduce risk while leading to large scale commercial field of HCPV systems. The process steps key lessons learned performance data and design decisions are presented.

2014-01-01T23:59:59.000Z

77

Deploying  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2009. 2. perfSONAR Architecture 2.1. Overview perfSONAR is an example of a Service Oriented Architecture (SOA), which offers the ability for specialized, autonomous services to...

78

Determination Of Reportable Radionuclides For DWPF Sludge Batch 7B (Macrobatch 9)  

SciTech Connect (OSTI)

The DWPF is receiving radioactive sludge slurry from HLW Tank 40. The radioactive sludge slurry in Tank 40 is a blend of the heel from Sludge Batch 7a (SB7a) and Sludge Batch 7b (SB7b) that was transferred to Tank 40 from Tank 51. The blend of sludge in Tank 40 is also referred to as Macrobatch 9 (MB9). This report develops the list of reportable radionuclides and associated activities as a function of time. Twenty-seven radionuclides have been identified as reportable for DWPF SB7b. Each of these radionuclides has a half-life greater than ten years and contributes more than 0.01% of the radioactivity on a Curie basis at some point from production through the 1100 year period between 2015 and 3115. For SB7b, all of the radionuclides in the Design Basis glass are reportable except for three radionuclides: Pd-107, Cs-135, and Th-230. At no time during the 1100- year period between 2015 and 3115 did any of these three radionuclides contribute to more than 0.01% of the radioactivity on a Curie basis. The radionuclide measurements made for SB7b are the most extensive conducted to date. Some method development/refinement occurred during the conduct of these measurements, leading to lower detection limits and more accurate measurement of some isotopes than was previously possible.

Crawford, C. L.; Diprete, D. P.

2012-12-17T23:59:59.000Z

79

Nuclear Deployment Scorecards | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Initiatives » Nuclear Reactor Technologies » Nuclear Deployment Initiatives » Nuclear Reactor Technologies » Nuclear Deployment Scorecards Nuclear Deployment Scorecards October 31, 2013 Quarterly Nuclear Deployment Scorecard - October 2013 The scorecard includes news updates, regulatory status, reactor design certification, early site permits, new plant construction progress, and expected operation dates. August 8, 2013 Quarterly Nuclear Deployment Scorecard - July 2013 The scorecard includes news updates, regulatory status, reactor design certification, early site permits, new plant construction progress, and expected operation dates. May 1, 2013 Quarterly Nuclear Power Deployment Scorecard - April 2013 The scorecard includes news updates, regulatory status, reactor design certification, early site permits, and new plant construction progress.

80

AMF Deployment, Steamboat Springs, Colorado  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Colorado Colorado Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment Planning STORMVEX Proposal Abstract and Related Campaigns Science Plan NWS Forecasting Plots STORMVEX Website Outreach STORMVEX Backgrounder (PDF, 1.6MB) News AMF2 STORMVEX Blog Images Contacts Gerald Mace AMF Deployment, Steamboat Springs, Colorado This view shows the instrument locations for the STORMVEX campaign. At the westernmost site is the Valley Floor. Heading east up the mountain is Christy Peak, Thunderhead, and Storm Peak Laboratory at the far east. Valley Floor: 40° 39' 43.92" N, 106° 49' 0.84" W Thunderhead: 40° 39' 15.12" N, 106° 46' 23.16" W Storm Peak: 40° 27' 18.36" N, 106° 44' 40.20" W

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

HOT TOPIC: Nanotechnology lecture  

Science Journals Connector (OSTI)

...Check-Bits HOT TOPIC: Nanotechnology lecture TOP SITE www.ukonlineforbusiness...proper handling. HOT TOPIC Nanotechnology lecture FUTURESHOCK Cyborgs...Cheltenham and Gloucester Branch. Nanotechnology Devices Defying Nature is taking......

HOT TOPIC: Nanotechnology lecture

2003-11-01T23:59:59.000Z

82

Sustainability of Large Photovoltaic Deployment: Environmental Research  

E-Print Network [OSTI]

Sustainability of Large Photovoltaic Deployment: Environmental Research Sustainability of Large Photovoltaic Deployment: Environmental ResearchEnvironmental ResearchEnvironmental Research Vasilis Fthenakis and Te from Cadmium Telluride Photovoltaic Manufacturing Scrap, Progress in Photovoltaics: Research

Homes, Christopher C.

83

Investigation of deployable structures and their actuation  

E-Print Network [OSTI]

Deployable Structures had not been designed for use in the oil field industry, and additionally have not been designed as devices to perform mechanical work. By analyzing deployable structures a detailed understanding of ...

Munro, Logan

2007-01-01T23:59:59.000Z

84

Optimal Deployment of Direction-finding Systems  

E-Print Network [OSTI]

-finding system. The first part of this dissertation is to prescribe DF deployment to maximize the effectiveness with which transmitter positions are estimated in an area of interest (AOI). Three methods are presented to prescribe DF deployment. The first method...

Kim, Suhwan

2013-03-27T23:59:59.000Z

85

Deployment-Based security for grid applications  

Science Journals Connector (OSTI)

Increasing complexity of distributed applications and commodity of resources through grids are making harder the task of deploying those applications. There is a clear need for a versatile deployment of distributed applications. In the same time, a security ...

Isabelle Attali; Denis Caromel; Arnaud Contes

2005-05-01T23:59:59.000Z

86

Federal Incentives for Wind Power Deployment  

Broader source: Energy.gov [DOE]

This factsheet lists some of the major federal incentives for wind power deployment as of September 2014.

87

Automation of the EMBL Hamburg protein crystallography beamline BW7B  

Science Journals Connector (OSTI)

The automation of the EMBL Hamburg wiggler beamline BW7B for protein crystallography is described. The beamline features an automated end-station, a robotic sample changer, semi-automated sample centering based on UV fluorescence and new control software including intuitive graphical user interfaces.

Pohl, E.

2004-08-17T23:59:59.000Z

88

RSG Deployment Case Testing Results  

SciTech Connect (OSTI)

The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

2005-09-01T23:59:59.000Z

89

Disposable telemetry cable deployment system  

DOE Patents [OSTI]

A disposable telemetry cable deployment system for facilitating information retrieval while drilling a well includes a cable spool adapted for insertion into a drill string and an unarmored fiber optic cable spooled onto the spool cable and having a downhole end and a stinger end. Connected to the cable spool is a rigid stinger which extends through a kelly of the drilling apparatus. A data transmission device for transmitting data to a data acquisition system is disposed either within or on the upper end of the rigid stinger.

Holcomb, David Joseph (Sandia Park, NM)

2000-01-01T23:59:59.000Z

90

Buildings Technologies Deployment | Clean energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Technologies Deployment Building Technologies Deployment SHARE Building Technologies Deployment benchmarking commercial buildings Once building technologies emerge and become commercially available, only in exceptional cases does robust market uptake automatically follow. Additional efforts remain to ensure that emerging and under-utilized technologies are successfully deployed to the fullest extent possible. ORNL helps optimize the energy performance of buildings and industrial processes by moving technologies to full use in residential, commercial, and industrial sectors through applications research, technical assistance, and a variety of deployment strategies. The team's comprehensive knowledge of buildings and energy use spans multi-building sites, whole-buildings, systems, components, and multi-level

91

Data:F7b6cefe-7b9d-42d4-b799-b577ab015988 | Open Energy Information  

Open Energy Info (EERE)

cefe-7b9d-42d4-b799-b577ab015988 cefe-7b9d-42d4-b799-b577ab015988 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

92

Federal Incentives for Wind Power Deployment | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Federal Incentives for Wind Power Deployment Federal Incentives for Wind Power Deployment Document that lists some of the major federal incentives for wind power deployment....

93

Chapter 9 - In-Home Deployments  

Science Journals Connector (OSTI)

Abstract In-home deployments can be used to study current behavior patterns or to evaluate prototype systems. Compared to other options such as lab studies, interviews, or surveys, in-home deployments offer unparalleled realism due to the in-situ nature of the deployment as part of the participants normal lives. However, in-home deployments require careful planning and considerable effort. This chapter will help in the planning and successful execution of home deployment studies by sharing insights drawn from our combined experience running many different studies in the home, and by using the deployment of the PreHeat prototype as a concrete example. Among the lessons we highlight are the importance of carefully considering the minimum viable prototype to build for deployment, the value of remote monitoring to catch problems, and the importance of flexibility and robustness in deployed systems to cope with unexpected issues in the home environment. By discussing the challenges we faced and the lessons we learned, we hope that others will be able to more easily conduct in-home deployments and gather the rich and informative data they provide. Our experiences have led us to develop and open source two platforms that strive to reduce the engineering effort required for deployments: .NET Gadgeteer (http://www.netmf.com/gadgeteer/), a prototyping platform for custom devices, and Lab of Things (http://www.lab-of-things.com/), an SDK (software development kit) that provides features such as remote monitoring and updates for home deployments.

A.J. Brush; Brian Meyers; James Scott

2015-01-01T23:59:59.000Z

94

Topical Committee | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Topical Committee Topical Committee In the interest of optimum technology transfer, the DOE Technical Standards Program (TSP) has set up a network of topical committees. These...

95

Tribal Topic Group Summary  

Broader source: Energy.gov (indexed) [DOE]

Caucus created a mission statement and resolution: - All Tribes with cultural ties to Yucca Mountain should be invited to join TEC - Ongoing funds to support Tribal Topic Group...

96

NREL: Technology Deployment Home Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Decathlon 2013 Heading to California Solar Decathlon 2013 Heading to California U.S. Coast Guard Saves Energy, Money Training Results in Decreased Energy Use and Costs for Sector Guam Standard Work Specifications Tool Now Available Standard Work Specifications Tool Now Available Weatherization industry can save specifications online and streamline work NREL Federal Fueling Station Data Supports Sandy Recovery NREL Federal Fueling Station Data Supports Sandy Recovery Decision Makers Able to Coordinate Access to Fuel NREL works with federal, state, and local government and private industry and organizations to deploy commercially available energy efficiency and renewable energy technologies. Our experts help prepare the market for emerging technologies by removing barriers to adoption. Use our technology

97

Stochastic Energy Deployment System (SEDS) | Open Energy Information  

Open Energy Info (EERE)

Stochastic Energy Deployment System (SEDS) Stochastic Energy Deployment System (SEDS) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Stochastic Energy Deployment System (SEDS) Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Topics: Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.nrel.gov/analysis/analysis_tools_cross.html#seds Country: United States Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

98

Community Renewable Energy Deployment: Sacramento Municipal Utility  

Open Energy Info (EERE)

Deployment: Sacramento Municipal Utility Deployment: Sacramento Municipal Utility District Projects Jump to: navigation, search Name Community Renewable Energy Deployment: Sacramento Municipal Utility District Projects Agency/Company /Organization US Department of Energy Focus Area Agriculture, Economic Development, Greenhouse Gas, Renewable Energy, Biomass - Anaerobic Digestion, Solar - Concentrating Solar Power, Solar, - Solar Pv, Biomass - Waste To Energy Phase Bring the Right People Together, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly available--Free Publication Date 2/2/2011 Website http://www1.eere.energy.gov/co Locality Sacramento Municipal Utility District, CA References Community Renewable Energy Deployment: Sacramento Municipal Utility District Projects[1]

99

Buildings Technologies Deployment | Clean energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

are successfully deployed to the fullest extent possible. ORNL helps optimize the energy performance of buildings and industrial processes by moving technologies to full use...

100

Community Renewable Energy Deployment Provides Replicable Examples...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

million in funding from DOE for an integrated renewable energy deployment plan using a biogas generation facility and solar photovoltaics (PV) to provide heating, cooling, and...

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Sandia National Laboratories: high PV deployment level  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

deployment level ECIS-Princeton Power Systems, Inc.: Demand Response Inverter On March 19, 2013, in DETL, Distribution Grid Integration, Energy, Energy Surety, Facilities, Grid...

102

Sandia National Laboratories: increase PV deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

increase PV deployment ECIS-Princeton Power Systems, Inc.: Demand Response Inverter On March 19, 2013, in DETL, Distribution Grid Integration, Energy, Energy Surety, Facilities,...

103

Quarterly Nuclear Deployment Scorecard - April 2014 | Department...  

Energy Savers [EERE]

April 2014 Quarterly Nuclear Deployment Scorecard - April 2014 News Updates On February 20, Secretary Moniz announced the issuance of loan guarantees totalling approximately 6.5...

104

Quarterly Nuclear Deployment Scorecard - July 2014 | Department...  

Office of Environmental Management (EM)

July 2014 Quarterly Nuclear Deployment Scorecard - July 2014 News Updates * The NRC Atomic Safety and Licensing Board (ASLB) has ruled that Toshiba's participation in Nuclear...

105

Accelerating CHP Deployment, United States Energy Association...  

Broader source: Energy.gov (indexed) [DOE]

Materials: April 15 - 16, 2002 Strategies for the Commercialization & Deployment of GHG Intensity-Reducing Technologies & Practices Meeting Materials: May 18-19, 2004 Advanced...

106

Mobile Traffic Management System Test Deployment  

E-Print Network [OSTI]

BERKELEY Mobile Traf?c Management System Test DeploymentHIGHWAYS MOBILE TRAFFIC MANAGEMENT SYSTEM TEST DEPLOYMENTMobile Transportation Management System (MTMS). This new and

Gerfen, Jeffrey Brian

2005-01-01T23:59:59.000Z

107

Featured Publications on Integrated Technology Deployment  

Office of Energy Efficiency and Renewable Energy (EERE)

Information on the analysis and technical assistance conducted through the integrated deployment effort to help various locations around the world address specific energy challenges. Includes case...

108

Integrated Deployment Success Stories | Department of Energy  

Office of Environmental Management (EM)

stories about how DOE has helped states, cities, tribes, islands, campuses, and utilities apply an integrated technology deployment approach to achieve clean energy goals....

109

Solar Power for Deployment in Populated Areas.  

E-Print Network [OSTI]

??The thesis presents background on solar thermal energy and addresses the structural challenges associated with the deployment of concentrating solar power fields in urban areas. (more)

Hicks, Nathan Andrew

2009-01-01T23:59:59.000Z

110

Grid Engineering for Accelerated Renewable Energy Deployment  

Broader source: Energy.gov [DOE]

The SunShot Grid Engineering for Accelerated Renewable Energy Deployment (GEARED) program supports increased power system research, development, and analytical capacity while simultaneously growing...

111

Toward Effective Vaccine Deployment: A Systematic Study  

Science Journals Connector (OSTI)

Vaccination is a commonly-used epidemic control strategy based on direct antiviral immunization and indirect reduction of virus transmissibility. There exist three factors related to the efficacy of vaccine deployment; they are: (1) vaccine coverage, ... Keywords: Age-specific compartmental model, Epidemic control, H1N1 influenza, Vaccine deployment strategy

Jiming Liu; Shang Xia

2011-10-01T23:59:59.000Z

112

PMU Deployment for Optimal State Estimation Performance  

E-Print Network [OSTI]

the benefits from data aggregation. Phasor Measurement Unit (PMU) is such an advanced device capablePMU Deployment for Optimal State Estimation Performance Yue Yang, Student Member IEEE, and Sumit are anticipated; however, due to the high cost of PMU installation, their deployment will continue to be selective

Roy, Sumit

113

Sandia National Laboratories: Research: Facilities: Technology Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technology Deployment Centers Technology Deployment Centers CRF Many of Sandia's unique research centers are available for use by U.S. industry, universities, academia, other laboratories, state and local governments, and the scientific community in general. Technology deployment centers are a unique set of scientific research capabilities and resources. The primary function of technology deployment centers is to satisfy Department of Energy programmatic needs, while remaining accessible to outside users. Contact For more information about Sandia technology deployment centers or for help in selecting a center to meet your needs, contact Mary Monson at mamonso@sandia.gov, (505) 844-3289. Advanced Power Sources Laboratory Combustion Research Facility Design, Evaluation, and Test Technology Facility

114

Federal Energy Management Program: Technology Deployment List  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment List Deployment List Technology Ranking Criteria Technologies featured in the Technology Deployment List were ranked by: Federal Impact: Combination of energy savings potential and applicability in the Federal market (50% weighting) Cost Effectiveness: Relative cost of the implementation and average expected return typically reported in case studies as simple payback period (30% weighting) Probability of Success: Combination of the qualitative characteristics scored separately and averaged to determine probability of success. Criteria include strength of supply chain, knowledge base, implementation difficulty, and customer acceptance (20% weighting). The Federal Energy Management Program's (FEMP) Technology Deployment List features information about promising new and underutilized energy-saving technologies available for Federal and commercial building sector deployment. Common considerations and barriers are also outlined.

115

Topic Group Participants  

Broader source: Energy.gov (indexed) [DOE]

Topic Group Report Topic Group Report Presented to: Transportation External Coordination Working Group April 5, 2005 Phoenix, Arizona Recent 180(c) Topic Group Activities Issue Papers 1. Funding Distribution Method 2. Allowable Activities 3. Definitions 4. Pass-Through Requirements 5. Contingency Plans 6. 180(c) Policy or Rulemaking 7. Timing and Eligibility* 8. Funding for Related Activities* 9. State Fees* 10. Funding Allocation Approach* 180(c) Policy & Procedures * Executive Summary * Draft Policy & Procedures * Draft Grant Application Pckg * Appendix *Papers 7-10 still under discussion Today's Discussion Items * Reviewed Topic Group member comments on a variety of issues * Key issues included: - Funding allocation and timing of grants - Planning grants - State fees/matching requirements - Related non-training activities

116

Texas - RRC District 7B Natural Gas, Wet After Lease Separation Proved  

U.S. Energy Information Administration (EIA) Indexed Site

Natural Gas, Wet After Lease Separation Proved Reserves (Billion Cubic Feet) Natural Gas, Wet After Lease Separation Proved Reserves (Billion Cubic Feet) Texas - RRC District 7B Natural Gas, Wet After Lease Separation Proved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's 842 1980's 862 947 947 1,210 937 850 833 828 840 560 1990's 627 536 550 580 513 539 610 559 510 465 2000's 356 290 294 383 364 932 1,663 2,412 2,750 2,424 2010's 2,625 3,887 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/1/2013 Next Release Date: 8/1/2014 Referring Pages: Natural Gas Proved Reserves, Wet After Lease Separation, as of Dec. 31 TX, RRC District 7B Natural Gas Reserves Summary as of Dec. 31

117

DETERMINATION OF REPORTABLE RADIONUCLIDES FOR DWPF SLUDGE BATCH 7B (MACROBATCH 9)  

SciTech Connect (OSTI)

The Waste Acceptance Product Specifications (WAPS) 1.2 require that The Producer shall report the inventory of radionuclides (in Curies) that have half-lives longer than 10 years and that are, or will be, present in concentrations greater than 0.05 percent of the total inventory for each waste type indexed to the years 2015 and 3115. As part of the strategy to comply with WAPS 1.2, the Defense Waste Processing Facility (DWPF) will report for each waste type, all radionuclides (with half-lives greater than 10 years) that have concentrations greater than 0.01 percent of the total inventory from time of production through the 1100 year period from 2015 through 3115. The initial listing of radionuclides to be included is based on the design-basis glass as identified in the Waste Form Compliance Plan (WCP) and Waste Form Qualification Report (WQR). However, it is required that this list be expanded if other radionuclides with half-lives greater than 10 years are identified that may meet the greater than 0.01% criterion for Curie content. Specification 1.6 of the WAPS, International Atomic Energy Agency (IAEA) Safeguards Reporting for High Level Waste (HLW), requires that the ratio by weights of the following uranium and plutonium isotopes be reported: U-233, U-234, U-235, U-236, U-238, Pu-238, Pu-239, Pu-240, Pu-241, and Pu- 242. Therefore, the complete set of reportable radionuclides must also include this set of U and Pu isotopes. The DWPF is receiving radioactive sludge slurry from HLW Tank 40. The radioactive sludge slurry in Tank 40 is a blend of the heel from Sludge Batch 7a (SB7a) and Sludge Batch 7b (SB7b) that was transferred to Tank 40 from Tank 51. The blend of sludge in Tank 40 is also referred to as Macrobatch 9 (MB9). This report develops the list of reportable radionuclides and associated activities as a function of time. The DWPF will use this list and the activities as one of the inputs for the development of the Production Records that relate to radionuclide inventory. This work was initiated through Technical Task Request (TTR) HLW-DWPF-TTR-2011-0004; Rev. 0 entitled Sludge Batch 7b Qualification Studies. Specifically, this report details results from performing Subtask II, Item 2 of the TTR and, in part, meets Deliverable 6 of the TTR. The work was performed following the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00247, Rev. 0 and Analytical Study Plan (ASP), SRNL-RP-2011-00248, Rev. 0. In order to determine the reportable radionuclides for SB7b (MB9), a list of radioisotopes that may meet the criteria as specified by the Department of Energys (DOE) WAPS was developed. All radioactive U- 235 fission products and all radioactive activation products that could be in the SRS HLW were considered. In addition, all U and Pu isotopes identified in WAPS 1.6 were included in the list. This list was then evaluated and some isotopes were excluded from the projection calculations. Based on measurements and analytical detection limits, 27 radionuclides have been identified as reportable for DWPF SB7b as specified by WAPS 1.2. The WCP and WQR require that all of the radionuclides present in the Design Basis glass be considered as the initial set of reportable radionuclides. For SB7b, all of the radionuclides in the Design Basis glass are reportable except for three radionuclides: Pd-107, Cs-135, and Th-230. At no time during the 1100- year period between 2015 and 3115 did any of these three radionuclides contribute to more than 0.01% of the radioactivity on a Curie basis. Two additional uranium isotopes (U-235 and -236) must be added to the list of reportable radionuclides in order to meet WAPS 1.6. All of the Pu isotopes (Pu-238, -239, -240, -241, and -242) and other U isotopes (U-233, -234, and -238) identified in WAPS 1.6 were already determined to be reportable according to WAPS 1.2 This brings the total number of reportable radionuclides for SB7b to 29. The radionuclide measurements made for SB7b are similar to those performed in the previous SB7a MB8 work. Some method development/ref

Crawford, C. L.; Diprete, D. P.

2014-05-01T23:59:59.000Z

118

Texas - RRC District 7B Dry Natural Gas Proved Reserves (Billion Cubic  

U.S. Energy Information Administration (EIA) Indexed Site

Dry Natural Gas Proved Reserves (Billion Cubic Feet) Dry Natural Gas Proved Reserves (Billion Cubic Feet) Texas - RRC District 7B Dry Natural Gas Proved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's 699 743 751 1980's 745 804 805 1,027 794 708 684 697 704 459 1990's 522 423 455 477 425 440 520 478 442 416 2000's 312 252 260 340 310 802 1,471 2,117 2,382 2,077 2010's 2,242 3,305 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/1/2013 Next Release Date: 8/1/2014 Referring Pages: Dry Natural Gas Proved Reserves as of Dec. 31 TX, RRC District 7B Dry Natural Gas Proved Reserves Dry Natural Gas Proved Reserves as of 12/31 (Summary)

119

ARM - News from the Steamboat Springs Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ColoradoNews from the Steamboat Springs Deployment Steamboat Deployment AMF Home Steamboat Springs Home Storm Peak Lab Data Plots and Baseline Instruments Data Sets Experiment Planning STORMVEX Proposal Abstract and Related Campaigns Science Plan NWS Forecasting Plots STORMVEX Website Outreach STORMVEX Backgrounder (PDF, 1.6MB) News AMF2 STORMVEX Blog Images Contacts Gerald Mace News from the Steamboat Springs Deployment Releases WPSD (Paducah, KY) "STORMVEX Cloud Study" January 19, 2011 The Daily Sentinel, Grand Junction "Steamboat project gives scientists unique, grounded look at clouds" December 12, 2010 Steamboat Pilot & Today "Steamboat cloud study to help create better global climate models" Image Gallery December 12, 2010 Also picked up by:

120

Property:DeploymentPrograms | Open Energy Information  

Open Energy Info (EERE)

DeploymentPrograms DeploymentPrograms Jump to: navigation, search Property Name DeploymentPrograms Property Type String Description Depolyment programs as listed in cleanenergysolutions.org Allows the following values: Audit Programs Demonstration & Implementation Green Power/Voluntary RE Purchase High Performance Buildings Industry Codes & Standards Project Development Public Tenders, Procurement, & Lead Examples Public-Private Partnerships Retrofits Ride Share, Bike Share, etc. Technical Assistance Training & Education Voluntary Appliance & Equipment Labeling Voluntary Industry Agreements Subproperties This property has the following 2 subproperties: G Greenhouse Gas Regional Inventory Protocol (GRIP) Website M Methods for Climate Change Technology Transfer Needs Assessments and

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

UNIRIB: Physics Topics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Physics Topics Physics Topics Research Capitalizing on the strengths of nine collaborating research universities and the world-class equipment available at the Holifield Radioactive Ion Beam Facility (HRIBF) at Oak Ridge National Laboratory (ORNL), the University Radioactive Ion Beam (UNIRIB) consortium is conducting research at the forefront of nuclear physics. UNIRIB, a division of the Oak Ridge Institute for Science and Education (ORISE), brings together researchers from around the world to study the short-lived, exotic nuclei that are involved in astrophysical processes. UNIRIB researchers participate in many of the nuclear physics experiments carried out at HRIBF. UNIRIB researchers are presently leading the following physics topics. To view these files, you will need the Adobe Reader, which is available free

122

Security Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Group Group Security and TEC * Tension exists between open forum concept of TEC and the ability of STG members to discuss security topics. - DOE will maintain the open forum - it will not form a subgroup of cleared members NAS Study * Some members want STG to formally recommend a fully independent review of security issues - DOE is reviewing the NAS study and has not formulated a position Security Topic Group (Continued) Classification Guide & Information Sharing Protocol * Guide is finished and undergoing internal concurrence - Slated for late September release * Protocol will be completed once the guide is issued Security-Related Lessons Learned * Lessons learned document was distributed and comments requested by the end of March Security Topic Group (Continued) SRG/CVSA Survey

123

A Strategic Framework for SMR Deployment  

Broader source: Energy.gov (indexed) [DOE]

A Strategic Framework for SMR Deployment February 24, 2012 Introduction A strategy for the successful deployment of small modular reactors (SMRs) must consider what the goals of deployment would entail, the challenges to achieving these goals and the approach to overcome those challenges. This paper will attempt to offer a framework for addressing these important issues at the outset of the program. The deployment of SMRs will be realized by private power companies making the decision to purchase and operate SMRs from private vendors. The government role is to set national priorities for clean energy and national security and create incentives to achieve them. The policy tools the government may choose to use to advance this technology in support of these national objectives will evolve as SMRs advance

124

NREL: Technology Deployment - Alternative Fuels Data Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alternative Fuels Data Center Alternative Fuels Data Center NREL developed and manages the Alternative Fuels Data Center (AFDC), the U.S. Department of Energy's comprehensive clearinghouse of information and data related to the deployment of alternative fuels, advanced vehicles, and energy efficiency in transportation for fleets, fuel providers, policymakers, and other stakeholders working to reduce petroleum use in transportation. Interactive Transportation Deployment Tools NREL's large suite of free online tools assist fleets and drivers in selecting and deploying the technologies and strategies that will best help them meet their environmental and energy goals. Fleets and drivers can use calculators, interactive maps, and data searches to evaluate, select, and deploy alternative fuels and advanced vehicles as

125

ARM - News from the Oliktok Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home Deployment Operations Baseline Instruments and Data Plots at the Archive Outreach News & Press New Sites Fact Sheet (PDF, 1.6MB) Images Contacts Fred Helsel, AMF Operations...

126

Deployment of EVs in the Federal Fleet  

Broader source: Energy.gov [DOE]

Presentation covers the Deployment of EV's in the Federal Fleet and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

127

Demonstration and Deployment Strategy Workshop: Summary  

Broader source: Energy.gov [DOE]

This report is based on the proceedings of the U.S. DOEs Bioenergy Technologies Office Demonstration and Deployment Strategy Workshop, held on March 1213, 2014, at Argonne National Laboratory.

128

Knowledge Portals: Components, Functionalities, and Deployment Challenges  

E-Print Network [OSTI]

Knowledge Portals: Components, Functionalities, and Deployment Challenges Claudia Loebbecke University of Cologne Kevin Crowston Syracuse University School of Information Studies Abstract Knowledge Portals (KPs) are highly integrative Knowledge Management Systems (KMS) that promise to synthesize widely

Crowston, Kevin

129

Analysis of deployable strut roof structures  

E-Print Network [OSTI]

Deployable structures are structures that can change shape from a compact to an expanded form. Thus, their advantage over conventional structures is adaptability, whether in the sense of adapting to changing environmental ...

Wolfe, Maxwell H. (Maxwell Henry)

2013-01-01T23:59:59.000Z

130

Leading the Nation in Clean Energy Deployment  

Office of Energy Efficiency and Renewable Energy (EERE)

This document summarizes key efforts and projects that are part of the DOE/NREL Integrated Deployment effort to integrated energy efficiency and renewable energy technologies in cities, states, island locations, and communities around the world.

131

Deployment-Based Security for Grid Applications  

Science Journals Connector (OSTI)

Increasing complexity of distributed applications and commodity of resources through grids are making harder the task of deploying ... distributed applications. In the same time, a security architecture must be a...

Isabelle Attali; Denis Caromel; Arnaud Contes

2005-01-01T23:59:59.000Z

132

State perspectives on clean coal technology deployment  

SciTech Connect (OSTI)

State governments have been funding partners in the Clean Coal Technology program since its beginnings. Today, regulatory and market uncertainties and tight budgets have reduced state investment in energy R and D, but states have developed program initiatives in support of deployment. State officials think that the federal government must continue to support these technologies in the deployment phase. Discussions of national energy policy must include attention to the Clean Coal Technology program and its accomplishments.

Moreland, T. [State of Illinois Washington Office, Washington, DC (United States)

1997-12-31T23:59:59.000Z

133

Reliable Deployment of Component-based Applications into Distributed Environments  

E-Print Network [OSTI]

Reliable Deployment of Component-based Applications into Distributed Environments Abbas Heydarnoori's quality of service properties such as reliability. In distributed sys- tems, the reliability that should be deployed into a large distributed en- vironment, several deployment configurations are typ

Czarnecki, Krzysztof

134

Focus Group Meeting (Topical Meeting)  

Broader source: Energy.gov [DOE]

Topical Meeting - Training Meeting agenda, summary and information package Meeting Date: April 30, 2008

135

Texas - RRC District 7B Nonassociated Natural Gas, Wet After Lease  

U.S. Energy Information Administration (EIA) Indexed Site

B Nonassociated Natural Gas, Wet After Lease Separation, Proved Reserves (Billion Cubic Feet) B Nonassociated Natural Gas, Wet After Lease Separation, Proved Reserves (Billion Cubic Feet) Texas - RRC District 7B Nonassociated Natural Gas, Wet After Lease Separation, Proved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1970's 608 1980's 530 655 733 872 645 574 589 546 576 364 1990's 413 379 380 393 332 263 378 299 306 275 2000's 242 203 237 314 288 859 1,589 2,350 2,682 2,322 2010's 2,504 3,754 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 8/1/2013 Next Release Date: 8/1/2014 Referring Pages: Nonassociated Natural Gas Proved Reserves, Wet After Lease

136

Synchrophasor Technologies and their Deployment in the Recovery...  

Energy Savers [EERE]

Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid Programs (August 2013) Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid...

137

Electric Vehicle Deployment: Policy Questions and Impacts to...  

Broader source: Energy.gov (indexed) [DOE]

Vehicle Deployment: Policy Questions and Impacts to the U.S. Electric Grid - EAC Recommendations (November 2011) Electric Vehicle Deployment: Policy Questions and Impacts to the...

138

Solar Photovoltaic Financing: Deployment on Public Property by...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Solar Photovoltaic Financing: Deployment on Public Property by State and Local Governments Solar Photovoltaic Financing: Deployment on Public Property by State and Local...

139

Development and Deployment of Advanced Emission Controls for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Deployment of Advanced Emission Controls for the Retrofit Market Development and Deployment of Advanced Emission Controls for the Retrofit Market 2003 DEER Conference Presentation:...

140

Energy Department Invests Over $7 Million to Deploy Tribal Clean...  

Energy Savers [EERE]

Energy Department Invests Over 7 Million to Deploy Tribal Clean Energy Projects Energy Department Invests Over 7 Million to Deploy Tribal Clean Energy Projects November 14, 2013...

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Navigating Roadblocks on the Path to Advanced Biofuels Deployment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Navigating Roadblocks on the Path to Advanced Biofuels Deployment Navigating Roadblocks on the Path to Advanced Biofuels Deployment Breakout Session 2: Frontiers and Horizons...

142

Strategies for the Commercialization & Deployment of GHG Intensity...  

Broader source: Energy.gov (indexed) [DOE]

Strategies for the Commercialization & Deployment of GHG Intensity-Reducing Technologies & Practices Strategies for the Commercialization & Deployment of GHG Intensity-Reducing...

143

Energy Department Actions to Deploy Combined Heat and Power,...  

Broader source: Energy.gov (indexed) [DOE]

Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

144

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems May 16, 2013 - 12:00am Addthis...

145

Federal Technology Deployment Pilot: Exterior Solid State Lighting...  

Energy Savers [EERE]

Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal Utility...

146

OpenStudio Core Development and Deployment Support - 2014 BTO...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Core Development and Deployment Support - 2014 BTO Peer Review OpenStudio Core Development and Deployment Support - 2014 BTO Peer Review Presenter: Larry Brackney, National...

147

Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues Fuel Cell Electric Vehicles and Hydrogen Infrastructure: Deployment and Issues This presentation by Bill Elrick...

148

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); November 2011 Composite Data Products - Deployment (Presentation)  

SciTech Connect (OSTI)

This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). November 2011 Composite Data Products - Deployment November 30, 2011.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

2012-06-01T23:59:59.000Z

149

Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA); Quarter 1 2012 Composite Data Products - Deployment (Presentation)  

SciTech Connect (OSTI)

This presentation is about the Early Fuel Cell Market Deployments: ARRA and Combined (IAA, DLA, ARRA). Quarter 1 2012 Composite Data Products - Deployment March 8, 2012.

Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.

2012-06-01T23:59:59.000Z

150

Environmental issues affecting clean coal technology deployment  

SciTech Connect (OSTI)

The author outlines what he considers to be the key environmental issues affecting Clean Coal Technology (CCT) deployment both in the US and internationally. Since the international issues are difficult to characterize given different environmental drivers in various countries and regions, the primary focus of his remarks is on US deployment. However, he makes some general remarks, particularly regarding the environmental issues in developing vs. developed countries and how these issues may affect CCT deployment. Further, how environment affects deployment depends on which particular type of clean coal technology one is addressing. It is not the author`s intention to mention many specific technologies other than to use them for the purposes of example. He generally categorizes CCTs into four groups since environment is likely to affect deployment for each category somewhat differently. These four categories are: Precombustion technologies such as coal cleaning; Combustion technologies such as low NOx burners; Postcombustion technologies such as FGD systems and postcombustion NOx control; and New generation technologies such as gasification and fluidized bed combustion.

Miller, M.J. [Electric Power Research Inst., Palo Alto, CA (United States)

1997-12-31T23:59:59.000Z

151

Topics In Primitive Roots  

E-Print Network [OSTI]

This monograph considers a few topics in the theory of primitive roots g(p) modulo a prime p>=2. A few estimates of the least primitive roots g(p) and the least prime primitive roots g^*(p) modulo p, a large prime, are determined. One of the estimate here seems to sharpen the Burgess estimate g(p) 0, to the smaller estimate g(p) 2. The expected order of magnitude is g(p) 1 constant. The corresponding estimates for least prime primitive roots g^*(p) are slightly higher. Anotrher topic deals with an effective lower bound #{p > x/log x for the number of primes p 1. The current results in the literature claim the lower bound #{p > x/(log x)^2, and have restrictions on the minimal number of fixed integers to three or more.

N. A. Carella

2015-01-23T23:59:59.000Z

152

Hot Topics in astrophysics  

Science Journals Connector (OSTI)

Three current topics in astrophysics are described on the occasion of the joint meeting of the AAPT and the American Astronomical Society (Jan. 7-11 2001) in San Diego CA. They are the habitability of Mars (evidence for ancient and contemporary water and indications of current volcanism);black holes and their intimate relationship with galaxy bulges including their involvement in the x-ray background; and the nature and origin of gamma-ray bursts.

Stephen P. Maran

2000-01-01T23:59:59.000Z

153

Manufacturing Innovation Topics Workshop  

Broader source: Energy.gov [DOE]

The Advanced Manufacturing Office (AMO) and the Office of the Secretary of Defense Manufacturing Technology Program (OSD ManTech) will host a workshop to discuss AMO's recent Request for Information (RFI) on Clean Energy Manufacturing Topic Areas as well as the recent areas of interest announced by OSD ManTech for a new Manufacturing Innovation Institute on October 8-9, 2014 in Fort Worth, TX.

154

Topics in String Phenomenology  

E-Print Network [OSTI]

We consider two questions in string ``phenomenology.'' First, are there any generic string predictions? Second, are there any general lessons which string theory suggests for thinking about low energy models, particularly in the framework of supersymmetry? Among the topics we consider are the squark and slepton spectrum, flavor symmetries, discrete symmetries including $CP$, and Peccei-Quinn symmetries. We also note that in some cases, discrete symmetries can be used to constrain the form of supersymmetry breaking.

Michael Dine

1993-09-23T23:59:59.000Z

155

AMF Deployment, Niamey, Niger, West Africa  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

West Africa West Africa Niamey Deployment AMF Home Niamey Home Data Plots and Baseline Instruments RADAGAST Website Rainfall Record (PDF) Publications List, (PDF) Experiment Planning RADAGAST Proposal Outreach Fact Sheets RADAGAST (PDF) Annual Climate Cycle in Niger, Africa (PDF) Posters AMF Poster, French Version We're Going to Sample the Sky in Africa! News Campaign Images AMMA International News AMF Deployment, Niamey, Niger, West Africa In 2006, the ARM Mobile Facility is collecting cloud and atmospheric property measurements from a location near the airport in Niamey, Niger, West Africa. Main Site: 13° 28' 39.15" N, 2° 10' 27.62" E Altitude: 205 meters Ancillary Site: 13° 31' 19.14" N, 2° 37' 56.46" E Altitude: 228.29 meters In January 2006, the second deployment of the ARM Mobile Facility (AMF)

156

AMF Deployment, Point Reyes National Seashore, California  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

California California Point Reyes Deployment AMF Home Point Reyes Home Data Plots and Baseline Instruments Experiment Planning MASRAD Proposal Abstract and Related Campaigns Outreach Posters Climate Research at Point Reyes National Seashore (horizontal) Climate Research at Point Reyes National Seashore (vertical) News Campaign Images AMF Deployment, Point Reyes National Seashore, California Point Reyes National Seashore, on the California coast north of San Francisco. Shelters: 38° 5' 30.51" N, 122° 57' 19.90" W Instrument Field: 38° 5' 27.6" N, 122° 57' 25.80" W Altitude: 8 meters Point Reyes National Seashore, on the California coast north of San Francisco, was the location of the first deployment of the DOE's Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF). The ARM

157

Greensburg, Kansas, Deployment Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Greensburg, Kansas, Deployment Project Greensburg, Kansas, Deployment Project Greensburg, Kansas, Deployment Project November 13, 2013 - 10:40am Addthis The U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) have helped Greensburg, Kansas, rebuild as a model green community. On May 4, 2007, a tornado destroyed or damaged 95% of the town's homes and businesses. Greensburg turned disaster into opportunity and created a plan to rebuild as a sustainable community with the help of a diverse group of experts, including DOE and NREL. To help make Greensburg's vision of rebuilding green a reality, DOE and NREL focused on the specific areas listed below. You can also read more in the fact sheet: A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities.

158

NREL: Technology Deployment - State and Local Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment Deployment Search More Search Options Site Map NREL helps states and local communities throughout the United States achieve their clean energy goals by supporting renewable energy and energy-saving projects through a variety of technical assistance and technology deployment programs. Analyze Energy Policy Impacts Analyze Energy Policy Impacts Find data to help your state, locality, or region establish beneficial clean energy policies. Learn more. Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player. Technical Assistance Webcast Experts present information on state and local energy projects, financing, policy and more... Renewable Energy Data Book NREL's Cean Energy Policy Analyses Project State of the States 2010 The role of policy in clean energy market transformation

159

Regional Energy Deployment System (ReEDS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional Energy Deployment Regional Energy Deployment System (ReEDS) Walter Short, Patrick Sullivan, Trieu Mai, Matthew Mowers, Caroline Uriarte, Nate Blair, Donna Heimiller, and Andrew Martinez Technical Report NREL/TP-6A20-46534 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Regional Energy Deployment System (ReEDS) Walter Short, Patrick Sullivan, Trieu Mai, Matthew Mowers, Caroline Uriarte, Nate Blair, Donna Heimiller, and Andrew Martinez Prepared under Task Nos. DOCC.1014, SS10.2210,

160

Demonstration and Deployment Successes: Sapphire Integrated Algal Biorefinery  

Broader source: Energy.gov [DOE]

Demonstration and Deployment Successes Jaime Moreno, Vice President of Projects, Sapphire Energy, Inc.

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Proposed Work Scope for the Rail Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Proposed Task Plan for TEC Rail Topic Group Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of National Transportation, Jay Jones and Alex Thrower Start Date: September 22, 2005 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail- related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

162

Federal Energy Management Program: Federal Technology Deployment Working  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technology Deployment Working Group Technology Deployment Working Group Energy Department Announces Interagency Committee to Increase Use of Clean Energy Technologies in Federal Facilities The Senior Executive Committee for Technology Deployment, a subcommittee of the Interagency Technology Deployment Working Group, brings together leaders of technology deployment programs from across the federal government to implement the Obama Administration's comprehensive strategy to reduce energy costs in agency facilities, while boosting American competitiveness in the global clean energy race. Learn more. Technology Briefs Boiler Combustion Control and Monitoring System Doing Time under the Sun Wireless Sensor Networks for Data Centers The Federal Technology Deployment Working Group helps Federal agencies evaluate and deploy new and underutilized technologies.

163

Analysis & Tools to Spur Increased Deployment of " Waste Heat...  

Open Energy Info (EERE)

Project Type Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type Topic 2 Topic Area 2: Data Gathering and Analysis Project...

164

Data:8d76ed74-d460-45e7-b86a-ac9b0ab7b1b2 | Open Energy Information  

Open Energy Info (EERE)

6ed74-d460-45e7-b86a-ac9b0ab7b1b2 6ed74-d460-45e7-b86a-ac9b0ab7b1b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of College Station, Texas (Utility Company) Effective date: 2009/07/23 End date if known: Rate name: Industrial - Time of use Sector: Industrial Description: Upon the customer's request, this rider shall be made available to customers billed under the rate schedule LP-3, whose monthly demand is three hundred (300) kW or greater, and who can reduce their load during the City's On-Peak time between 5:00 p.m. and 8:00 p.m. Source or reference: Source Parent: Comments Applicability

165

Preserving Privacy in RFID Deployment RVSOcc0401  

E-Print Network [OSTI]

Preserving Privacy in RFID Deployment RVS­Occ­04­01 RVS, Faculty of Technology, University that can preserve privacy. Background RFID technology has its roots in early ``friend or foe'' detection of Bielefeld Jan E. Hennig # Bielefeld, 2004­03­23 Radio Frequency Identification, RFID, is an item

Ladkin, Peter B.

166

Federal Technology Deployment Working Group | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Technologies » Technology Deployment » Federal Technology Technologies » Technology Deployment » Federal Technology Deployment Working Group Federal Technology Deployment Working Group October 7, 2013 - 9:11am Addthis Energy Department Announces Interagency Committee to Increase Use of Clean Energy Technologies in Federal Facilities The Senior Executive Committee for Technology Deployment, a subcommittee of the Interagency Technology Deployment Working Group, brings together leaders of technology deployment programs from across the federal government to implement the Obama Administration's comprehensive strategy to reduce energy costs in agency facilities, while boosting American competitiveness in the global clean energy race. Learn more. The Federal Technology Deployment Working Group helps Federal agencies evaluate and deploy new and underutilized technologies.

167

SunShot Initiative: High Penetration Solar Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High Penetration Solar Deployment High Penetration Solar Deployment to someone by E-mail Share SunShot Initiative: High Penetration Solar Deployment on Facebook Tweet about SunShot Initiative: High Penetration Solar Deployment on Twitter Bookmark SunShot Initiative: High Penetration Solar Deployment on Google Bookmark SunShot Initiative: High Penetration Solar Deployment on Delicious Rank SunShot Initiative: High Penetration Solar Deployment on Digg Find More places to share SunShot Initiative: High Penetration Solar Deployment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Competitive Awards Solar Utility Networks: Replicable Innovations in Solar Energy High Penetration Solar Deployment Grid Integration Advanced Concepts

168

PNNL Technology Planning and Deployment Group | Open Energy Information  

Open Energy Info (EERE)

Planning and Deployment Group Planning and Deployment Group (Redirected from Technology Planning and Deployment) Jump to: navigation, search Logo: Technology Planning and Deployment Name Technology Planning and Deployment Agency/Company /Organization Pacific Northwest National Laboratory Sector Energy Website http://tpd.pnl.gov/ References Technology Planning and Development [1] "The Technology Planning & Deployment (TP&D) group is part of the Pacific Northwest National Laboratory's (PNNL's) Energy and Environment Directorate. TP&D staff provide customers with a unique combination of experience and expertise with capabilities in economics and regulatory analysis, systems engineering, marketing, technology adaptation and application, policy analysis, and project management."[1]

169

Average deployments versus missile and defender parameters  

SciTech Connect (OSTI)

This report evaluates the average number of reentry vehicles (RVs) that could be deployed successfully as a function of missile burn time, RV deployment times, and the number of space-based interceptors (SBIs) in defensive constellations. Leakage estimates of boost-phase kinetic-energy defenses as functions of launch parameters and defensive constellation size agree with integral predictions of near-exact calculations for constellation sizing. The calculations discussed here test more detailed aspects of the interaction. They indicate that SBIs can efficiently remove about 50% of the RVs from a heavy missile attack. The next 30% can removed with two-fold less effectiveness. The next 10% could double constellation sizes. 5 refs., 7 figs.

Canavan, G.H.

1991-03-01T23:59:59.000Z

170

Deployment Effects of Marin Renewable Energy Technologies  

SciTech Connect (OSTI)

Given proper care in siting, design, deployment, operation and maintenance, marine and hydrokinetic technologies could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood, due to a lack of technical certainty. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based approach to the emerging wave and tidal technology sectors in order to evaluate the impact of these technologies on the marine environment and potentially conflicting uses. The projects scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios will capture variations in technical approaches and deployment scales to properly identify and characterize environmental impacts and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential effects of these emerging technologies and focus all stakeholders onto the critical issues that need to be addressed. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industrys development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory and navigational issues. The results of this study are structured into three reports: 1. Wave power scenario description 2. Tidal power scenario description 3. Framework for Identifying Key Environmental Concerns This is the second report in the sequence and describes the results of conceptual feasibility studies of tidal power plants deployed in Tacoma Narrows, Washington. The Narrows contain many of the same competing stakeholder interactions identified at other tidal power sites and serves as a representative case study. Tidal power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize impacts, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informs the process of selecting representative tidal power devices. The selection criteria is that such devices are at an advanced stage of development to reduce technical uncertainties and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. A number of other developers are also at an advanced stage of development including Verdant Power, which has demonstrated an array of turbines in the East River of New York, Clean Current, which has demonstrated a device off Race Rocks, BC, and OpenHydro, which has demonstrated a device at the European Marine Energy Test Center and is on the verge of deploying a larger device in the Bay of Fundy. MCT demonstrated their device both at Devon (UK) and Strangford Narrows (Northern Ireland). Furthermore OpenHydro, CleanCurrent, and MCT are the three devices being installed at the Minas Passage (Canada). Environmental effects will largely scale with the size of tidal power development. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nom

Brian Polagye; Mirko Previsic

2010-06-17T23:59:59.000Z

171

Metals Production Requirements for Rapid Photovoltaics Deployment  

E-Print Network [OSTI]

If global photovoltaics (PV) deployment grows rapidly, the required input materials need to be supplied at an increasing rate. In this paper, we quantify the effect of PV deployment levels on the scale of metals production. For example, we find that if cadmium telluride {copper indium gallium diselenide} PV accounts for more than 3% {10%} of electricity generation by 2030, the required growth rates for the production of indium and tellurium would exceed historically-observed production growth rates for a large set of metals. In contrast, even if crystalline silicon PV supplies all electricity in 2030, the required silicon production growth rate would fall within the historical range. More generally, this paper highlights possible constraints to the rate of scaling up metals production for some PV technologies, and outlines an approach to assessing projected metals growth requirements against an ensemble of past growth rates from across the metals production sector. The framework developed in this paper may be...

Kavlak, Goksin; Jaffe, Robert L; Trancik, Jessika E

2015-01-01T23:59:59.000Z

172

Best Practices and Tools for Large-scale Deployment of Renewable Energy and  

Open Energy Info (EERE)

Best Practices and Tools for Large-scale Deployment of Renewable Energy and Best Practices and Tools for Large-scale Deployment of Renewable Energy and Energy Efficiency Techniques Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Best Practices and Tools for Large-scale Deployment of Renewable Energy and Energy Efficiency Techniques in ESCWA Agency/Company /Organization: United Nations Economic and Social Commission for Western Asia Focus Area: Energy Efficiency, Renewable Energy, Solar, Wind Topics: Implementation, Policies/deployment programs, Background analysis Resource Type: Lessons learned/best practices Website: www.escwa.un.org/information/publications/edit/upload/sdpd-09-TP3.pdf Country: Bahrain, Egypt, Iraq, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, Sudan, Syria, United Arab Emirates, Yemen UN Region: "Western Asia & North Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

173

Regional Effort to Deploy Clean Coal Technologies  

SciTech Connect (OSTI)

The Southern States Energy Board's (SSEB) 'Regional Effort to Deploy Clean Coal Technologies' program began on June 1, 2003, and was completed on January 31, 2009. The project proved beneficial in providing state decision-makers with information that assisted them in removing barriers or implementing incentives to deploy clean coal technologies. This was accomplished through two specific tasks: (1) domestic energy security and diversity; and (2) the energy-water interface. Milestones accomplished during the project period are: (1) Presentations to Annual Meetings of SSEB Members, Associate Member Meetings, and the Gasification Technologies Council. (2) Energy: Water reports - (A) Regional Efforts to Deploy Clean Coal Technologies: Impacts and Implications for Water Supply and Quality. June 2004. (B) Energy-Water Interface Challenges: Coal Bed Methane and Mine Pool Water Characterization in the Southern States Region. 2004. (C) Freshwater Availability and Constraints on Thermoelectric Power Generation in the Southeast U.S. June 2008. (3) Blackwater Interactive Tabletop Exercise - Decatur, Georgia April 2007. (4) Blackwater Report: Blackwater: Energy and Water Interdependency Issues: Best Practices and Lessons Learned. August 2007. (5) Blackwater Report: BLACKWATER: Energy Water Interdependency Issues REPORT SUMMARY. April 2008.

Gerald Hill; Kenneth Nemeth; Gary Garrett; Kimberly Sams

2009-01-31T23:59:59.000Z

174

Remotely deployable aerial inspection using tactile sensors  

SciTech Connect (OSTI)

For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

MacLeod, C. N.; Cao, J.; Pierce, S. G.; Dobie, G.; Summan, R. [Centre for Ultrasonic Engineering, University of Strathclyde, Glasgow, G1 1XW (United Kingdom); Sullivan, J. C.; Pipe, A. G. [Bristol Robotics Laboratory, University of the West of England, Bristol, BS16 1QY (United Kingdom)

2014-02-18T23:59:59.000Z

175

NREL: Regional Energy Deployment System (ReEDS) Model - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional Energy Deployment System (ReEDS) Model Energy Analysis ReEDS Regional Energy Deployment System Model Regional Energy Deployment System (ReEDS) Model Energy Analysis ReEDS Regional Energy Deployment System Model Search More Search Options Site Map Printable Version Publications The following are publications - including technical reports, journal articles, conference papers, and posters - focusing on the Wind Deployment System (WinDS) and Regional Energy Deployment System (ReEDS) models. Technical Reports Eurek, K.; Denholm, P.; Margolis, R.; Mowers, M. (2013). Sensitivity of Utility-Scale Solar Deployment Projections in the SunShot Vision Study to Market and Performance Assumptions. 55 pp.; NREL Report No. TP-6A20-55836. Martinez, A.; Eurek, K.; Mai, T.; Perry, A. (2013). Integrated Canada-U.S. Power Sector Modeling with the Regional Energy Deployment System (ReEDS).

176

SunShot Initiative: Deployable Commercial Rooftop Solar Electric System  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployable Commercial Rooftop Deployable Commercial Rooftop Solar Electric System to someone by E-mail Share SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on Facebook Tweet about SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on Twitter Bookmark SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on Google Bookmark SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on Delicious Rank SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on Digg Find More places to share SunShot Initiative: Deployable Commercial Rooftop Solar Electric System on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Competitive Awards Solar Utility Networks: Replicable Innovations in Solar Energy

177

Energy Department Invests More Than $7 Million to Deploy Tribal...  

Office of Environmental Management (EM)

Invests More Than 7 Million to Deploy Tribal Clean Energy Energy Department Invests More Than 7 Million to Deploy Tribal Clean Energy November 20, 2013 - 12:00am Addthis The...

178

Dynamic instabilities imparted by CubeSat deployable solar panels  

E-Print Network [OSTI]

In this work, multibody dynamics simulation was used to investigate the effects of solar panel deployment on CubeSat attitude dynamics. Nominal and partial/asymmetric deployments were simulated for four different solar ...

Peters, Eric David

2014-01-01T23:59:59.000Z

179

Nationwide: Slashing Red Tape To Speed Solar Deployment for Homes...  

Energy Savers [EERE]

Slashing Red Tape To Speed Solar Deployment for Homes and Businesses Nationwide: Slashing Red Tape To Speed Solar Deployment for Homes and Businesses January 24, 2014 - 12:00am...

180

Columbia Power Technologies, Inc. Deploys its Direct Drive Wave...  

Energy Savers [EERE]

Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy Columbia Power Technologies, Inc. Deploys its Direct Drive Wave Energy Buoy April 9, 2013 - 12:00am...

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Notice of Intent: Deploying Solutions to Improve the Energy Efficiency...  

Broader source: Energy.gov (indexed) [DOE]

Deploying Solutions to Improve the Energy Efficiency of U.S. Commercial Buildings (FOA-0001168) Notice of Intent: Deploying Solutions to Improve the Energy Efficiency of U.S....

182

DOE Hydrogen and Fuel Cells Program Record #13007: Industry Deployed...  

Broader source: Energy.gov (indexed) [DOE]

13007: Industry Deployed Fuel Cell Backup Power (BuP) DOE Hydrogen and Fuel Cells Program Record 13007: Industry Deployed Fuel Cell Backup Power (BuP) This record from the DOE...

183

DOE Fuel Cell Technologies Office Record 14010: Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

0: Industry Deployed Fuel Cell Powered Lift Trucks DOE Fuel Cell Technologies Office Record 14010: Industry Deployed Fuel Cell Powered Lift Trucks This program record from the U.S....

184

DOE Fuel Cell Technologies Office Record 14009: Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

09: Industry Deployed Fuel Cell Backup Power (BuP) DOE Fuel Cell Technologies Office Record 14009: Industry Deployed Fuel Cell Backup Power (BuP) This program record from the U.S....

185

Topics for letter "Q" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Virtual Tour Topics for letter "Q" QAMS quadrupolar nuclei quadrupole quadrupole mass filter qualifications quantification Quardrupole Quasi-optical bridge Quiet Wing Quiet Wing...

186

Topics for letter "R" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "R" R&D 100 award radiochemistry Radiochemistry Annex Radiochemistry Annex radiologial...

187

Topics for letter "u" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "u" uantitative UEC UHV VT SPM ultra-high resolution ultra-high vacuum Ultrafast ultrahigh vacuum ultraviolet...

188

Topics for letter "W" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "W" W-band pulsed EPR spectrometer Washington State Academy of Sciences Washington State University waste...

189

Topics for letter "n" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "n" nano Nano Letters nano-scale particles nano-SIMS NanoDesi nanodevices nanoparticle...

190

Accelerating CHP Deployment, United States Energy Association (USEA), August 2011  

Broader source: Energy.gov [DOE]

An Industry Consultation by the United States Energy Association (USEA) on Accelerating Combined Heat and Power (CHP) Deployment

191

Readily Available Data Help to Overcome Geothermal Deployment...  

Energy Savers [EERE]

Articles Energy Department Announces National Geothermal Data System to Accelerate Geothermal Energy Development The National Geothermal Data System deploys free,...

192

Data:59faa62e-76ce-4c71-ba7b-470051aae296 | Open Energy Information  

Open Energy Info (EERE)

faa62e-76ce-4c71-ba7b-470051aae296 faa62e-76ce-4c71-ba7b-470051aae296 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Large Power Facility Charge Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

193

Data:494fcddb-37de-4dd7-b66a-496533a80136 | Open Energy Information  

Open Energy Info (EERE)

fcddb-37de-4dd7-b66a-496533a80136 fcddb-37de-4dd7-b66a-496533a80136 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: Delete Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation

194

Data:03576abd-1005-489d-b400-9a241524db7b | Open Energy Information  

Open Energy Info (EERE)

abd-1005-489d-b400-9a241524db7b abd-1005-489d-b400-9a241524db7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights - 400 Watt Mercury Vapor - Metered Sector: Lighting Description: Wood Pole Charge - $2.00 Fiberglass Pole - $10.00/fixture for 60 months Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

195

Data:90589092-7b73-4dc4-9358-517668b323b8 | Open Energy Information  

Open Energy Info (EERE)

589092-7b73-4dc4-9358-517668b323b8 589092-7b73-4dc4-9358-517668b323b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OL - Outdoor Lighting 100 watt sodium vapor Sector: Lighting Description: Availability Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial or industrial customer located adjacent to an electric distribution line of Utility. Character of Service Outdoor Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html

196

Data:9236a434-7b39-4632-b275-f2172814c239 | Open Energy Information  

Open Energy Info (EERE)

4-7b39-4632-b275-f2172814c239 4-7b39-4632-b275-f2172814c239 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Return check fee Sector: Commercial Description: This schedule is for services and products rendered to Customers by BCLP. Source or reference: http://www.bountifulutah.gov/WorkArea/showcontent.aspx?id=6138 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

197

Data:54f2bde0-d357-4313-83e7-7b6416116247 | Open Energy Information  

Open Energy Info (EERE)

f2bde0-d357-4313-83e7-7b6416116247 f2bde0-d357-4313-83e7-7b6416116247 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Self Consumed with Demand: B3PI Sector: Industrial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

198

Data:08343154-f48b-4fb7-b094-26eee1338164 | Open Energy Information  

Open Energy Info (EERE)

-f48b-4fb7-b094-26eee1338164 -f48b-4fb7-b094-26eee1338164 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Parking and Street 175 W Wood Pole Sector: Lighting Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

199

Data:57766632-8930-4e58-bfd5-ff86403c7b43 | Open Energy Information  

Open Energy Info (EERE)

32-8930-4e58-bfd5-ff86403c7b43 32-8930-4e58-bfd5-ff86403c7b43 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Pendant Lamp Fixtures -Standard Ornamental Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

200

Data:522e48ec-3c94-4379-9090-c7b153004cb1 | Open Energy Information  

Open Energy Info (EERE)

ec-3c94-4379-9090-c7b153004cb1 ec-3c94-4379-9090-c7b153004cb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Manufacturing Service Rate--Schedule SMSD Sector: Industrial Description: This rate shall apply to the firm electric power requirements where (a) a customer's currently effective contract demand is greater than 25,000 kW. Source or reference: http://www.jwemc.org/rateforms.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:54caf81c-e639-4717-9814-71757162b7b6 | Open Energy Information  

Open Energy Info (EERE)

1c-e639-4717-9814-71757162b7b6 1c-e639-4717-9814-71757162b7b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Benton, Wisconsin (Utility Company) Effective date: 2007/08/17 End date if known: Rate name: Mg-1 Municipal Water Pumping service Sector: Commercial Description: Application: This rate will be available for water pumping by the municipality. Power Cost Adjustment Clause: Charge per all kWh varies monthly. Commitment to Community Rider: $1.33 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=460 Source Parent:

202

Data:787f4a98-7693-4527-9110-7b211627220d | Open Energy Information  

Open Energy Info (EERE)

a98-7693-4527-9110-7b211627220d a98-7693-4527-9110-7b211627220d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lenoir, Tennessee (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: TOU MSB(General Power) Sector: Commercial Description: Source or reference: http://www.lcub.com/electric/SitePages/erates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

203

Data:D5bcd640-d634-4356-9bb7-b2e866622473 | Open Energy Information  

Open Energy Info (EERE)

bcd640-d634-4356-9bb7-b2e866622473 bcd640-d634-4356-9bb7-b2e866622473 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Leavenworth-Jefferson E C, Inc Effective date: 2010/05/01 End date if known: Rate name: Street Light Rate (MV 175 W) Sector: Lighting Description: Available for municipal outdoor lighting service on public thoroughfares, city housing development, and in public parks where service can be supplied from a breaker box installed by the cooperative on existing facilities of the cooperative. Street Light Rate (MV 175 W) Source or reference: Rate Binder #7 (Illinois State University)

204

Data:01b46684-4088-478a-867a-8917aaddd7b9 | Open Energy Information  

Open Energy Info (EERE)

684-4088-478a-867a-8917aaddd7b9 684-4088-478a-867a-8917aaddd7b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Fayetteville, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Residential Rates Sector: Residential Description: Source or reference: http://www.fpunet.com/node/15 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

205

Data:A0462981-8435-48c7-b49b-8bb006fc1899 | Open Energy Information  

Open Energy Info (EERE)

62981-8435-48c7-b49b-8bb006fc1899 62981-8435-48c7-b49b-8bb006fc1899 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Large Commercial Critical Peak Three Phase Pricing Sector: Commercial Description: Source or reference: http://www.sawnee.com/Rate%20Pdfs/CPPC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

206

Data:C223585a-cd7b-413b-8203-844083860124 | Open Energy Information  

Open Energy Info (EERE)

a-cd7b-413b-8203-844083860124 a-cd7b-413b-8203-844083860124 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2006/06/01 End date if known: Rate name: RS-ERS (Three Phase) Sector: Residential Description: This schedule is available at any location within the Utilities Commission service area in accordance with the service policies of the Commission. Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

207

Data:78c9600a-724e-4e76-8643-9436509ffb7b | Open Energy Information  

Open Energy Info (EERE)

a-724e-4e76-8643-9436509ffb7b a-724e-4e76-8643-9436509ffb7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Natchitoches, Louisiana (Utility Company) Effective date: End date if known: Rate name: LARGE COMMERCIAL RATE Sector: Commercial Description: Additional Info: Demand Charges The monthly charge includes 25 KW of Demand Over 25 KW Demand $3.00 per KW The rate(s) are subjected to Power Cost Adjustment. Source or reference: http://www.natchitochesla.gov/content/utility-billing Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

208

Data:751c4f7b-5378-47ec-b3cf-559976240833 | Open Energy Information  

Open Energy Info (EERE)

f7b-5378-47ec-b3cf-559976240833 f7b-5378-47ec-b3cf-559976240833 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights - 1000 Watt MH Flood Vapor - Metered Sector: Lighting Description: Wood Pole Charge - $2.00 Fiberglass Pole - $10.00/fixture for 60 months Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

209

Data:166a4519-ab6a-4751-8224-7b8140e962ba | Open Energy Information  

Open Energy Info (EERE)

19-ab6a-4751-8224-7b8140e962ba 19-ab6a-4751-8224-7b8140e962ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Space and Water Heating - Three Phase Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

210

Data:D18a06b0-6980-42a7-b86f-263405086547 | Open Energy Information  

Open Energy Info (EERE)

6b0-6980-42a7-b86f-263405086547 6b0-6980-42a7-b86f-263405086547 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 100 Watt HPS- Open Bottom Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

211

Data:0d626703-e413-42b7-b530-246317fef56e | Open Energy Information  

Open Energy Info (EERE)

d626703-e413-42b7-b530-246317fef56e d626703-e413-42b7-b530-246317fef56e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: End date if known: Rate name: Single-Phase Residential Sector: Residential Description: Source or reference: http://www.lyrec.com/Account/Rates/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

212

Data:52ca1149-de7b-4037-b14e-6123746632b9 | Open Energy Information  

Open Energy Info (EERE)

de7b-4037-b14e-6123746632b9 de7b-4037-b14e-6123746632b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: HPS-Cobra/Cutoff 100 watts Sector: Lighting Description: Fixed Monthly rate= Energy Rate + Maintenance Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

213

Data:3350ccc3-a87c-4da7-b126-7019422919d0 | Open Energy Information  

Open Energy Info (EERE)

-a87c-4da7-b126-7019422919d0 -a87c-4da7-b126-7019422919d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: General Service Electric Rates GS-1 (Single Phase) Sector: Commercial Description: This rate is applicable to all non residential customers whose highest annual peak demand does not exceed 50 KW. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

214

Data:19abb7b4-fbe6-4198-8865-f58fe17813d5 | Open Energy Information  

Open Energy Info (EERE)

abb7b4-fbe6-4198-8865-f58fe17813d5 abb7b4-fbe6-4198-8865-f58fe17813d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Overhead Wiring No Existing Wood Pole MV 1000 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge $180 one time charge for instillation Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

215

Renewables and CHP Deployment in the UK January 2002  

E-Print Network [OSTI]

Renewables and CHP Deployment in the UK to 2020 Jim Watson January 2002 Tyndall Centre for Climate Change Research Working Paper 21 #12;Renewables and CHP Deployment in the UK to 2020 Jim Watson Energy....................................................................................................6 3. The Deployment of Renewables and CHP to 2020

Watson, Andrew

216

TEC Working Group Topic Groups Archives Consolidated Grant Topic Group |  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Grant Topic Consolidated Grant Topic Group TEC Working Group Topic Groups Archives Consolidated Grant Topic Group The Consolidated Grant Topic Group arose from recommendations provided by the TEC and other external parties to the DOE Senior Executive Transportation Forum in July 1998. It was proposed that the consolidation of multiple funding streams from numerous DOE sources into a single grant would provide a more equitable and efficient means of assistance to States and Tribes affected by DOE nuclear material shipments. The group serves as an important vehicle for DOE senior managers to assess and incorporate stakeholder input into the development of a consolidated funding vehicle for transportation activities, should DOE implement such a program. Some of the major issues under consideration by the Consolidated Grant

217

Analysis & Tools to Spur Increased Deployment of " Waste Heat"  

Open Energy Info (EERE)

Tools to Spur Increased Deployment of " Waste Heat" Tools to Spur Increased Deployment of " Waste Heat" Rejection/Recycling Hybrid GHP Systems in Hot, Arid or Semiarid Climates Like Texas Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Analysis & Tools to Spur Increased Deployment of " Waste Heat" Rejection/Recycling Hybrid GHP Systems in Hot, Arid or Semiarid Climates Like Texas Project Type / Topic 1 Recovery Act - Geothermal Technologies Program: Ground Source Heat Pumps Project Type / Topic 2 Topic Area 2: Data Gathering and Analysis Project Description As GHP systems offer substantial energy efficiency by leveraging earth's intrinsic thermal capacitance, they could play a pivotal role in achieving the DoE's Building Technologies Pro-gram's "zero energy" goal in heavily cooling-dominated climates. Moreover, SHR-augmented GHP systems, in particular, could play a vital role in reducing building energy consumption and limiting greenhouse gas (GHG) emissions in heavily cooling dominated states, like Texas, which are experiencing large increases in population and correspondingly, peak electricity demand. If only 0.1% of Texas,' Arizona's, New Mexico's and Nevada's nearly 15 million-or 15,000-homes were to install new (or convert their existing HVAC or heat pump system to) a full or hybrid GHP system, it would result in between $400 and $800 million USD of new economic activity, most of which would be domestic. Moreover, these 15,000 homes would cut their annual energy consumption-and concomitant GHG emissions-by roughly 40-70%; on average they would save about $1,000 USD in annual operating costs, collectively saving about $15 million USD annually. A conservative GHP industry estimate is that at least 900 people would be directly employed for every 10,000 GHP units installed.

218

Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leading the Nation in Clean Energy Deployment Leading the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable energy technology solutions. Disaster Recovery DOE and NREL technical experts have helped communities like Greensburg, Kansas, and New Orleans, Louisiana, successfully rebuild following disaster by providing assistance with sustainable community planning, forward-thinking policy development, and

219

Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)  

Broader source: Energy.gov (indexed) [DOE]

the Nation in Clean Energy Deployment the Nation in Clean Energy Deployment The U.S. Department of Energy (DOE) is pursuing an aggressive, scalable, and replicable strategy to accelerate market adoption of clean energy solutions to power homes, businesses, and vehicles. Using the comprehensive Integrated Deployment approach developed by the National Renewable Energy Laboratory (NREL), DOE partners with communities, cities, states, federal agen- cies, and territories to identify and implement a variety of efficiency and renewable energy technology solutions. Disaster Recovery DOE and NREL technical experts have helped communities like Greensburg, Kansas, and New Orleans, Louisiana, successfully rebuild following disaster by providing assistance with sustainable community planning, forward-thinking policy development, and

220

Sandia National Laboratories: Research: Facilities: Technology Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineering Sciences Experimental Facilities (ESEF) Engineering Sciences Experimental Facilities (ESEF) Technology Deployment Centers Advanced Power Sources Laboratory Engineering Sciences Experimental Facilities (ESEF) Trisonic Wind Tunnel Hypersonic Wind Tunnel High Altitude Chamber Explosive Components Facility Ion Beam Laboratory Materials Science and Engineering Center Pulsed Power and Systems Validation Facility Radiation Detection Materials Characterization Laboratory Shock Thermodynamic Applied Research Facility (STAR) Weapon and Force Protection Center Design, Evaluation and Test Technology Facility Research Engineering Sciences Experimental Facilities (ESEF) The ESEF complex contains several independent laboratories for experiments and advanced diagnostics in the fields of thermodynamics, heat transfer,

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Deployment of EVs in the Federal Fleet  

Broader source: Energy.gov (indexed) [DOE]

Electric Vehicles 101 Electric Vehicles 101 eere.energy.gov The Parker Ranch installation in Hawaii Deployment of EVs in the Federal Fleet FUPWG Rapid City, South Dakota October 20 th , 2010 Amanda Sahl Federal Energy Management Program 2 | Electric Vehicles 101 eere.energy.gov FEMP facilitates the Federal Government"s implementation of sound, cost-effective energy management and investment practices to enhance the nation"s energy security and environmental stewardship. 3 | Electric Vehicles 101 eere.energy.gov Agenda * Overview of the Federal Fleet * Infrastructure Requirements * Current implementation and activity * Ongoing barriers and questions 4 | Electric Vehicles 101 eere.energy.gov Federal Fleet Inventory

222

NREL: Technology Deployment - Building Energy Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Energy Systems Building Energy Systems NREL experts develop comprehensive energy assessments, models, and tools to optimize building systems across energy efficiency and renewable energy while also improving occupant comfort, safety, and productivity. Northeast Denver Housing Center Northeast Denver Housing Center NREL Identifies PV for 28 Affordable Housing Units Boulder County Housing Authority Boulder County Housing Authority NREL Recommendations Lead to 153 Net Zero Energy Residences Expertise and Knowledge NREL offers technical assistance and project development support by working closely with industry partners to research, develop, and deploy advanced building technologies. Examples include: Building Energy Audits and Assessments NREL provides technical assistance, guidelines, checklists, and data

223

Intelligent Transportation Systems Deployment Analysis System | Open Energy  

Open Energy Info (EERE)

Intelligent Transportation Systems Deployment Analysis System Intelligent Transportation Systems Deployment Analysis System Jump to: navigation, search Tool Summary Name: Intelligent Transportation Systems Deployment Analysis System Agency/Company /Organization: Cambridge Systematics Sector: Energy Focus Area: Transportation Resource Type: Software/modeling tools Website: idas.camsys.com/ Country: United States Northern America References: http://idas.camsys.com/ The ITS Deployment Analysis System (IDAS) is software developed by the Federal Highway Administration that can be used in planning for Intelligent Transportation System (ITS) deployments. State, regional, and local planners can use IDAS to estimate the benefits and costs of ITS investments - which are either alternatives to or enhancements of traditional highway

224

PNNL Technology Planning and Deployment Group | Open Energy Information  

Open Energy Info (EERE)

Deployment Group Deployment Group Jump to: navigation, search Logo: Technology Planning and Deployment Name Technology Planning and Deployment Agency/Company /Organization Pacific Northwest National Laboratory Sector Energy Website http://tpd.pnl.gov/ References Technology Planning and Development [1] "The Technology Planning & Deployment (TP&D) group is part of the Pacific Northwest National Laboratory's (PNNL's) Energy and Environment Directorate. TP&D staff provide customers with a unique combination of experience and expertise with capabilities in economics and regulatory analysis, systems engineering, marketing, technology adaptation and application, policy analysis, and project management."[1] Primary Services Building and facilities energy utilization assessments, audits,

225

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

226

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

227

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

228

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

229

Alternative Fuels Data Center: Alternative Fuel Development and Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Development and Deployment Grants to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Development and Deployment Grants on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

230

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

231

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

232

Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Zero Emission Vehicle Zero Emission Vehicle (ZEV) Deployment Support to someone by E-mail Share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Facebook Tweet about Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Twitter Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Google Bookmark Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Delicious Rank Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on Digg Find More places to share Alternative Fuels Data Center: Zero Emission Vehicle (ZEV) Deployment Support on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

233

Summary of Selected Vision Topics  

E-Print Network [OSTI]

This is an introduction to some of the MIT AI vision work of the last few years. The topics discussed are 1) Waltz's work on line drawing semantics, 2) heterarchy, 3) the ancient learning business and 4) copying scenes. ...

Winston, Patrick H.

234

NREL: Technology Deployment - Solar Technical Assistance Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technical Assistance Team Technical Assistance Team Strategic Sequencing for State Distributed PV Policies: A Quantitative Analysis of Policy Impacts and Interactions Recent NREL analysis of state policies revealed that the sequence of policy implementation can accelerate solar photovoltaic (PV) markets-and that policy change doesn't have to be costly. Download the full report or summary to learn more, or view the webinar. The Solar Technical Assistance Team (STAT) gathers NREL solar technology and deployment experts to provide information on solar policies, regulations, financing, and other issues for state and local government decision makers. The team provides a variety of technical assistance, including: Quick Response. For state and local governments that require a fast turnaround in response to a time-sensitive question or expert testimony on

235

NREL: Technology Deployment - Project Development Model  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Development Model Project Development Model NREL developed the Project Development Model to evaluate the risks and investment decisions required for successful renewable energy project development. The two-phase iterative model includes elements in project fundamentals and project development based off commercial project development practices supported by tools such as pro formas and checklists. Project Fundamentals or BEPTC(tm) Renewable Energy Project Development Tool For help with the BEPTC phase of your project, check out the Renewable Energy Project Development Tool, developed by NREL for U.S. Department of Energy's Community Renewable Energy Deployment effort. The tool helps you quickly establish the key motivators and feasibility of your project. Strong project fundamentals and an understanding of how a project fits

236

NREL: Technology Deployment - Project Success Stories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Success Stories Project Success Stories NREL's technology deployment best practices, project support, and technical assistance, and technology acceleration activities are resulting in successful renewable energy and energy efficiency implementation in numerous locations. View success stories highlighting NREL's work with: Cities and Communities Greensburg, Kansas Greensburg: Photo of wind turbines in a green field. An International Inspiration for Green Disaster Recovery For 3 years after a devastating tornado struck Greensburg, Kansas, NREL technical experts helped the town rebuild as a model green community completely powered by a 12.5 megawatt wind farm and surrounded by the highest per-capita concentration of LEED-certified buildings in the United States-13 of which are saving $200,000 annually. Learn more.

237

Clean energy deployment: addressing financing cost  

Science Journals Connector (OSTI)

New methods are needed to accelerate clean energy policy adoption. To that end, this study proposes an innovative financing scheme for renewable and energy efficiency deployment. Financing barriers represent a notable obstacle for energy improvements and this is particularly the case for low income households. Implementing a policy such as PACEproperty assessed clean energyallows for the provision of upfront funds for residential property owners to install electric and thermal solar systems and make energy efficiency improvements to their buildings. This paper will inform the design of better policies tailored to the creation of the appropriate conditions for such investments to occur, especially in those countries where most of the population belongs to the lowmiddle income range facing financial constraints.

Nadia Ameli; Daniel M Kammen

2012-01-01T23:59:59.000Z

238

A Strategic Framework for SMR Deployment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

A Strategic Framework for SMR Deployment A Strategic Framework for SMR Deployment A Strategic Framework for SMR Deployment A strategy for the successful deployment of small modular reactors (SMRs) must consider what the goals of deployment would entail, the challenges to achieving these goals and the approach to overcome those challenges. This paper will attempt to offer a framework for addressing these important issues at the outset of the program. The deployment of SMRs will be realized by private power companies making the decision to purchase and operate SMRs from private vendors. The government role is to set national priorities for clean energy and national security and create incentives to achieve them. The policy tools the government may choose to use to advance this technology in support of these national objectives will evolve as SMRs

239

SRNL Deploys Innovative Radiation Mapping Device | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SRNL Deploys Innovative Radiation Mapping Device SRNL Deploys Innovative Radiation Mapping Device SRNL Deploys Innovative Radiation Mapping Device November 3, 2011 - 12:00pm Addthis The Savannah River National Laboratory completed successful deployments of the RadBall, a gamma radiation-mapping device. The Savannah River National Laboratory completed successful deployments of the RadBall, a gamma radiation-mapping device. AIKEN, S.C. - The Savannah River National Laboratory (SRNL), EM's national lab, has made strides with remote technology designed to reduce worker exposure while measuring radiation in contaminated areas. uilding on a successful collaboration with the United Kingdom's National Nuclear Laboratory, SRNL completed successful deployments of RadBall, a gamma radiation-mapping device, after testing the technology. The device

240

Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated  

Broader source: Energy.gov (indexed) [DOE]

Leading the Nation in Clean Energy Deployment (Fact Sheet), Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID) Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID) This document summarizes key efforts and projects that are part of the DOE/NREL Integrated Deployment effort to integrated energy efficiency and renewable energy technologies in cities, states, island locations, and communities around the world. id_overview.pdf More Documents & Publications A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) Rising Above the Water: New Orleans Implements Energy Efficiency and Sustainability Practices Following Hurricanes Katrina and Rita (Fact

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Community Renewable Energy Deployment Webinars | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Community Renewable Energy Deployment Webinars Community Renewable Energy Deployment Webinars Community Renewable Energy Deployment Webinars Community Renewable Energy Deployment (CommRE) Webinars provide information on successful community renewable energy projects, including the challenges and barriers faced during development. Find past webinars, and download presentations and supporting materials below. Past Webinars April 16, 2013: Community-Scale Anaerobic Digesters This webinar provided information on San Jose, California's, commercial-scale, high solids dry fermentation anaerobic digestion system, and the Forest County Potawatomi Community's anaerobic digester project. March 19, 2013: Renewable Energy Parks This webinar provided information on how two cities in Washington and New York integrated multiple renewable energy technologies to create renewable

242

Community Renewable Energy Deployment Projects | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deployment Projects Deployment Projects Community Renewable Energy Deployment Projects The selected DOE Community Renewable Energy Deployment (CommRE) projects receive technical assistance from DOE's National Renewable Energy Laboratory in the areas of concepts, best practices, planning, financial approaches, and policy guidance to help achieve specific goals. More than $20.5 million in total Recovery Act funding will be leveraged with approximately $167 million in local government and private industry funding to complete the following projects. City of Montpelier, Montpelier, Vermont Forest County Potawatomi Community, Milwaukee, Wisconsin Haxtun Wind, Phillips County, Colorado Sacramento Municipal Utility District, Sacramento, California University of California at Davis, Davis, California

243

Evaluation of Stationary Fuel Cell Deployments, Costs, and Fuels (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes NREL's technology validation of stationary fuel cell systems and presents data on number of deployments, system costs, and fuel types.

Ainscough, C.; Kurtz, J.; Peters, M.; Saur, G.

2013-10-01T23:59:59.000Z

244

DOE Supports Renewable Energy Deployment Projects for Forest...  

Broader source: Energy.gov (indexed) [DOE]

(FCPC) has significantly reduced greenhouse gas emissions through the deployment of a biogas generation facility and solar photovoltaic system. In 2011, the Community completed...

245

Report: U.S. Military Accelerates Deployment of Clean Energy...  

Office of Environmental Management (EM)

(GW), enabling the military to meet its goal for the deployment of 3 GW of renewable energy by 2025. Currently, solar photovoltaic and biomass installations are forecast to...

246

Examining the Process of Automation Development and Deployment.  

E-Print Network [OSTI]

??In order to develop a better understanding of the process of development and deployment of automated systems, this thesis examines aspects of project execution and (more)

Barsalou, Edward

2006-01-01T23:59:59.000Z

247

India Solar Resource Data: Enhanced Data for Accelerated Deployment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

India Solar Resource Data Enhanced Data for Accelerated Deployment Identifying potential locations for solar photovoltaic (PV) and concentrating solar power (CSP) projects requires...

248

ARM - News from the Los Angeles to Hawaii Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigator News from the Los Angeles to Hawaii Deployment Media Coverage Lemont Patch "Argonne Scientists Help Launch MAGIC Climate Study" October 2, 2012 Scientific...

249

Evaluation of Imagers in a Biological Sensing Deployment  

E-Print Network [OSTI]

Therefore, we have utilized solar panels to power the entiremonitoring sensors, and solar panel. Main componentssensors - Battery - Solar panel Node Deployment Wireless/

2007-01-01T23:59:59.000Z

250

Fuel Cell Technologies Office Record 14010 ? Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

10 (Rev. 1) Date: 08122014 Title: Industry Deployed Fuel Cell Powered Lift Trucks Originators: Pete Devlin, Kristian Kiuru Approved by: Sunita Satyapal and Rick Farmer Date: 08...

251

Physics Topics - MST - UW Plasma Physics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Physics Topics UW Madison Madison Symmetric Torus Physics Topics MST HomeGraduate Student InformationLinksTourControl and Auxiliary SystemsPhysics TopicsDeviceResearch MissionMST...

252

Data:91825893-ec7b-447c-85a0-57040c1bfd8d | Open Energy Information  

Open Energy Info (EERE)

3-ec7b-447c-85a0-57040c1bfd8d 3-ec7b-447c-85a0-57040c1bfd8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: area lighting 1000 w quartz Sector: Lighting Description: area lighting,1000w quartz maximum 348 kwh per lamp Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

253

Data:Ee982839-6b64-4677-9335-7b7588880e33 | Open Energy Information  

Open Energy Info (EERE)

6b64-4677-9335-7b7588880e33 6b64-4677-9335-7b7588880e33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lodi, Wisconsin (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand 8am-8pm Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0811 per kilowatt-hour.

254

ATMOSPHERE AND SPECTRAL MODELS OF THE KEPLER-FIELD PLANETS HAT-P-7b AND TrES-2  

SciTech Connect (OSTI)

We develop atmosphere models of two of the three Kepler-field planets that were known prior to the start of the Kepler mission (HAT-P-7b and TrES-2). We find that published Kepler and Spitzer data for HAT-P-7b appear to require an extremely hot upper atmosphere on the dayside, with a strong thermal inversion and little day-night redistribution. The Spitzer data for TrES-2 suggest a mild thermal inversion with moderate day-night redistribution. We examine the effect of nonequilibrium chemistry on TrES-2 model atmospheres and find that methane levels must be adjusted by extreme amounts in order to cause even mild changes in atmospheric structure and emergent spectra. Our best-fit models to the Spitzer data for TrES-2 lead us to predict a low secondary eclipse planet-star flux ratio ({approx}<2 x 10{sup -5}) in the Kepler bandpass, which is consistent with what very recent observations have found. Finally, we consider how the Kepler-band optical flux from a hot exoplanet depends on the strength of a possible extra optical absorber in the upper atmosphere. We find that the optical flux is not monotonic in optical opacity, and the non-monotonicity is greater for brighter, hotter stars.

Spiegel, David S.; Burrows, Adam, E-mail: dsp@astro.princeton.ed, E-mail: burrows@astro.princeton.ed [Department of Astrophysical Sciences, Peyton Hall, Princeton University, Princeton, NJ 08544 (United States)

2010-10-10T23:59:59.000Z

255

Data:96008752-b1dd-461e-930e-568db4ef7b0d | Open Energy Information  

Open Energy Info (EERE)

b1dd-461e-930e-568db4ef7b0d b1dd-461e-930e-568db4ef7b0d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

256

Other Topics | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Other Topics Other Topics Other Topics Are States required to provide a 1099 to individuals who receive State Energy Efficient Appliance Rebates? Can DOE provide suggested Privacy Act language for use in a universal WAP application form? Are weekly reports required for the SEP ARRA grant? Are there any regulations that prohibit using WAP, SEP, or EECBG funds to hire a person with a criminal record? How to keep track of Recovery Act and Non-Recovery Act funding on One Contract DOE position on potential patent infringement Reporting of funds drawn down to capitalize a revolving loan fund or loan loss reserve For purposes of Section 410 of the American Recovery and Reinvestment Act (ARRA), what are the relevant versions of the referenced building energy codes? Can a grantee request a waiver for a replacement refrigerator that

257

Rapid Deployment of Rich Catalytic Combustion  

SciTech Connect (OSTI)

The overall objective of this research under the Turbines Program is the deployment of fuel flexible rich catalytic combustion technology into high-pressure ratio industrial gas turbines. The resulting combustion systems will provide fuel flexibility for gas turbines to burn coal derived synthesis gas or natural gas and achieve NO{sub x} emissions of 2 ppmvd or less (at 15 percent O{sub 2}), cost effectively. This advance will signify a major step towards environmentally friendly electric power generation and coal-based energy independence for the United States. Under Phase 1 of the Program, Pratt & Whitney (P&W) performed a system integration study of rich catalytic combustion in a small high-pressure ratio industrial gas turbine with a silo combustion system that is easily scalable to a larger multi-chamber gas turbine system. An implementation plan for this technology also was studied. The principal achievement of the Phase 1 effort was the sizing of the catalytic module in a manner which allowed a single reactor (rather than multiple reactors) to be used by the combustion system, a conclusion regarding the amount of air that should be allocated to the reaction zone to achieve low emissions, definition of a combustion staging strategy to achieve low emissions, and mechanical integration of a Ceramic Matrix Composite (CMC) combustor liner with the catalytic module.

Richard S. Tuthill

2004-06-10T23:59:59.000Z

258

DOE Technical Standards Program: Topical Committees  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Topical Committee Topical Committee Office of Nuclear Safety Internet Linkage for TSP Topical Committees In the interest of optimum technology transfer, the DOE Technical Standards Program (TSP) has set up a network of topical committees. These committees provide a forum for communication across the DOE complex on technical standards related activities. If you would like information about a specific topical committee, or wish to join one of the groups, we've provided a roster of TSP Topical Committees and corresponding Topical Committee Chairpersons. Expectations of DOE Topical Committees The March 9, 1998 memorandum (provided here in web page format) from Rick Serbu, Technical Standards Program (TSP) Manager, EH-31, to J. Robert Wayland, Metrology Topical Committee Secretary, Sandia National Laboratories, discusses general TSP expectations of DOE topical standards committees. This memorandum should be reviewed by all DOE/contractor personnel involved in topical committee activities.

259

Effective epidemic control via strategic vaccine deployment: a systematic approach  

Science Journals Connector (OSTI)

Vaccination is an effective way to control infectious disease spreading and epidemic by adjusting the composite structure of susceptible, infectious and vaccinated populations. There are three factors related to vaccine deployment arrangements; they ... Keywords: disease infection, epidemic spreading dynamics, vaccine deployment

Jiming Liu; Shang Xia

2010-11-01T23:59:59.000Z

260

Shape Recovery of Viscoelastic Deployable Structures and Sergio Pellegrino  

E-Print Network [OSTI]

and opposite sense folding. I. Introduction Deployable structures made of thin carbon fiber reinforced polymerShape Recovery of Viscoelastic Deployable Structures Kawai Kwok and Sergio Pellegrino California Institute of Technology, Pasadena, CA 91125 The paper investigates the shape recovery behavior of a simple

Pellegrino, Sergio

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Visual Design of Service Deployment in Complex Physical Environments  

E-Print Network [OSTI]

and to the information engineer a suitable service deployment scheme compatible with the environment. The PermissionVisual Design of Service Deployment in Complex Physical Environments Augusto Celentano and Fabio for in- teractive services in complex physical environments using a knowl- edge based approach to define

Celentano, Augusto

262

Deployment and coverage maintenance in mobile sensor networks  

E-Print Network [OSTI]

Deployment of mobile nodes in a region of interest is a critical issue in building a mobile sensor network because it affects cost and detection capabilities of the system. The deployment of mobile sensors in essence is the movement of sensors from...

Lee, Jaeyong

2009-05-15T23:59:59.000Z

263

Utility-Scale Smart Meter Deployments, Plans & Proposals  

Broader source: Energy.gov (indexed) [DOE]

edisonfoundation.net/IEE edisonfoundation.net/IEE Utility-Scale Smart Meter Deployments, Plans & Proposals April 2010 Utility State Target Number of Meters Notes Resources AEP 1 IN, KY, MI, OH, OK, TX, VA, WV 5,000,000 AEP plans on deploying smart meters to all customers within their service territory and have deployed 10,000 meters to customers in South Bend, IN, and are presently deploying another 700,000 to AEP-Texas customers. Timing for the remaining deployments will depend on specific conditions in each of the seven operating company subsidiaries. AEP Corporate Sustainability Report 2009 2 Allegheny Power MD, PA, WV 700,000 Allegheny launched pilots in Morgantown, WV and Urbana, MD to test smart meters and thermostats (1,140 meters installed). In PA, Act 129 (2008)

264

Related Links on Community Renewable Energy Deployment | Department of  

Broader source: Energy.gov (indexed) [DOE]

Community Renewable Energy Deployment Community Renewable Energy Deployment Related Links on Community Renewable Energy Deployment The following publications and websites provide helpful information for communities planning or implementing renewable energy and energy efficiency projects. Publications The U.S. Department of Energy (DOE) and its National Renewable Energy Laboratory (NREL) publish numerous community guides, resources, and examples, as well as publications geared toward organizations that provide technical assistance to communities. Community Guides, Resources, and Examples These documents provide how-to information, steps, and resources for community-wide projects, as well as lessons learned from other communities. A Guide to Community Solar: Utility, Private, and Non-Profit Project

265

Major research topics in combustion  

SciTech Connect (OSTI)

The Institute for Computer Applications in Science and Engineering (ICASE) and NASA Langley Research Center (LaRC) hosted a workshop on October 2--4, 1989 to discuss some combustion problems of technological interest to LaRC and to foster interaction with the academic community in these research areas. The topics chosen for this purpose were flame structure, flame holding/extinction, chemical kinetics, turbulence-kinetics interaction, transition to detonation, and reacting free shear layers. This document contains the papers and edited versions of general discussions on these topics. The lead paper set the stage for the meeting by discussing the status and issues of supersonic combustion relevant to the scramjet engine. Experts were then called upon to review the current knowledge in the aforementioned areas, to focus on how this knowledge can be extended and applied to high-speed combustion, and to suggest future directions of research in these areas.

Hussaini, M.Y.; Kumar, A.; Voigt, R.G. (eds.)

1992-01-01T23:59:59.000Z

266

Quarterly Nuclear Deployment Summary, April 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 Quarterly Nuclear Deployment Summary, April 2012 April 30, 2012 - 12:31pm Addthis Quarterly Nuclear Deployment Summary The U.S. NRC voted to approve the issuance of the COLs for Southern Nuclear's Vogtle Units 3 and 4 on February 9, 2012. The issuance marks the first COL ever to be issued and the construction of a new nuclear power plant in more than 30 years. SCE&G's V.C Summer Units 2 and 3 received approval for COLs on March 30, 2012, making them the second US new-build in 30 years. The Tennessee Valley Authority has revised the cost and time estimates of Unit 2 at the Watts Bar Nuclear Plant. The new schedule estimates the cost to be in the range of $4 billion with a completion date of late 2015. South Mississippi Electric Power Association (SMEPA) has signed a

267

Outdoor Solid-State Lighting Technology Deployment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Technologies » Technology Deployment » Outdoor Solid-State Technologies » Technology Deployment » Outdoor Solid-State Lighting Technology Deployment Outdoor Solid-State Lighting Technology Deployment October 7, 2013 - 9:10am Addthis Outdoor solid-state lighting (SSL) technology has the potential to reduce U.S. lighting energy usage by nearly one half and contribute significantly to our nation's climate change solutions. The U.S. Department of Energy's (DOE) Buildings Technologies Office offers a wealth of information on its Solid-State Lighting website. Visit the site to find: SSL Basics Studies and Reports CALiPER Summary Reports Tools SSL Webcasts. Also see: FEMP Outdoor SSL Initiative: Resources for Outdoor SSL Applications outlines resources available for outdoor solid-state lighting projects. Better Buildings Alliance: This DOE initiative is driven and managed

268

DOE, Invensys Operations Management to Develop, Deploy Operator Training  

Broader source: Energy.gov (indexed) [DOE]

DOE, Invensys Operations Management to Develop, Deploy Operator DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants December 10, 2012 - 12:00pm Addthis Washington, DC - A new U.S. Department of Energy (DOE) cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system (OTS) could eventually help commercialize important carbon capture technologies at the nation's power plants. The high-fidelity, real-time OTS for a generic supercritical once-through (SCOT) pulverized-coal power plant will be installed at the National Energy Technology Laboratory's (NETL's) Advanced Virtual Energy Simulation

269

Property:Number of Devices Deployed | Open Energy Information  

Open Energy Info (EERE)

Devices Deployed Devices Deployed Jump to: navigation, search Property Name Number of Devices Deployed Property Type Number Pages using the property "Number of Devices Deployed" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 0 + MHK Projects/ADM 3 + 1 + MHK Projects/ADM 5 + 1 + MHK Projects/AW Energy EMEC + 1 + MHK Projects/AWS II + 2 + MHK Projects/Admirality Inlet Tidal Energy Project + 450 + MHK Projects/Agucadoura + 3 + MHK Projects/Alaska 18 + 100 + MHK Projects/Alaska 36 + 100 + MHK Projects/Algiers Cutoff Project + 40 + MHK Projects/Algiers Light Project + 0 + MHK Projects/Anconia Point Project + 0 + MHK Projects/Ashley Point Project + 0 + MHK Projects/Avondale Bend Project + 0 + MHK Projects/Bar Field Bend + 0 +

270

Report on Synchrophasor Technologies and Their Deployment in Recovery Act  

Broader source: Energy.gov (indexed) [DOE]

Report on Synchrophasor Technologies and Their Deployment in Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available August 15, 2013 - 10:48am Addthis The Office of Electricity Delivery and Energy Reliability has released a new report that explains synchrophasor technologies and how they can be used to improve the efficiency, reliability, and resiliency of grid operations. The report also includes an analysis of the costs and benefits of synchrophasors, based on data and initial results from Recovery Act-funded projects that are deploying the technologies. The report is available now for downloading. Addthis Related Articles Reports on the Impact of the Smart Grid Investment Grant Program Now

271

Energy Department Launches Public-Private Partnership to Deploy Hydrogen  

Broader source: Energy.gov (indexed) [DOE]

Public-Private Partnership to Deploy Public-Private Partnership to Deploy Hydrogen Infrastructure Energy Department Launches Public-Private Partnership to Deploy Hydrogen Infrastructure May 13, 2013 - 1:37pm Addthis News Media Contact (202) 586-4940 WASHINGTON -- The Energy Department today launched H2USA -- a new public-private partnership focused on advancing hydrogen infrastructure to support more transportation energy options for U.S. consumers, including fuel cell electric vehicles (FCEVs). The new partnership brings together automakers, government agencies, gas suppliers, and the hydrogen and fuel cell industries to coordinate research and identify cost-effective solutions to deploy infrastructure that can deliver affordable, clean hydrogen fuel in the United States. "Fuel cell technologies are an important part of an all-of-the-above

272

Sysco Deploys Hydrogen Powered Pallet Trucks | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sysco Deploys Hydrogen Powered Pallet Trucks Sysco Deploys Hydrogen Powered Pallet Trucks Sysco Deploys Hydrogen Powered Pallet Trucks July 12, 2010 - 2:50pm Addthis Food service distribution company Sysco celebrated the grand opening of its highly efficient distribution center in June in Houston. As part of Sysco's efforts to reduce its carbon footprint, the company deployed almost 100 pallet trucks powered by fuel cells that create only water and heat as by-products. The hydrogen fuel cell project's cost was partially covered by funding from a $1.2 million grant provided by the American Recovery and Reinvestment Act through the U.S. Department of Energy's Fuel Cell Technologies Program. The total project cost was $3.3 million. The 98 new Raymond Corporation pallet lifts are powered by Plug Power

273

Report on Synchrophasor Technologies and Their Deployment in Recovery Act  

Broader source: Energy.gov (indexed) [DOE]

on Synchrophasor Technologies and Their Deployment in on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available August 15, 2013 - 10:48am Addthis The Office of Electricity Delivery and Energy Reliability has released a new report that explains synchrophasor technologies and how they can be used to improve the efficiency, reliability, and resiliency of grid operations. The report also includes an analysis of the costs and benefits of synchrophasors, based on data and initial results from Recovery Act-funded projects that are deploying the technologies. The report is available now for downloading. Addthis Related Articles Reports on the Impact of the Smart Grid Investment Grant Program Now

274

Synchrophasor Technologies and their Deployment in the Recovery Act Smart  

Broader source: Energy.gov (indexed) [DOE]

Synchrophasor Technologies and their Deployment in the Recovery Act Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid Programs (August 2013) Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid Programs (August 2013) The American Recovery and Reinvestment Act of 2009 provided $4.5 billion for the Smart Grid Investment Grant (SGIG), Smart Grid Demonstration Program (SGDP), and other DOE smart grid programs. These programs provided grants to the electric utility industry to deploy smart grid technologies to modernize the nation's electric grid. As a part of these programs, independent system operators, regional transmission organizations, and electric utilities installed synchrophasor and supporting technologies and systems in their electric power transmission systems.

275

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant  

Broader source: Energy.gov (indexed) [DOE]

Guidance for Deployment of Mobile Technologies for Nuclear Power Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers This report is a guidance document prepared for the benefit of commercial nuclear power plants' (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making,

276

Deployment Models for Commercialized Carbon Capture and Storage  

Science Journals Connector (OSTI)

Deployment Models for Commercialized Carbon Capture and Storage ... Several proposed integrated gasification-combined cycle and postcombustion coal CO2 capture projects are teaming with oil companies for use of the captured CO2 in EOR. ...

Richard A. Esposito; Larry S. Monroe; Julio S. Friedman

2010-08-19T23:59:59.000Z

277

Analysis of Open Automated Demand Response Deployments in California  

E-Print Network [OSTI]

LBNL-6560E Analysis of Open Automated Demand Response Deployments in California and Guidelines The work described in this report was coordinated by the Demand Response Research. #12; #12;Abstract This report reviews the Open Automated Demand Response

278

Navigating Roadblocks on the Path to Advanced Biofuels Deployment  

Broader source: Energy.gov [DOE]

Breakout Session 2: Frontiers and Horizons Session 2C: Navigating Roadblocks on the Path to Advanced Biofuels Deployment Arunas Chesonis, Chief Executive Officer and Chairman of the Board, Sweetwater Energy

279

Concentrating Solar Deployment System (CSDS) -- A New Model for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

solar resource or are close to large electric-load growth (such as in southern California). Fig. 6: CSP Capacity deployment by region in 2050 4. SENSITIVITY CASES FOR FEDERAL...

280

Regulatory Instruments for Deployment of Clean Energy Technologies  

E-Print Network [OSTI]

Answering to the formidable challenge of climate change calls for a quick transition to a future economy with a drastic reduction in GHG emissions. And this in turn requires the development and massive deployment of new ...

Prez-Arriaga, Ignacio J.

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Combined Heat & Power Technology Overview and Federal Sector Deployment  

Broader source: Energy.gov [DOE]

Presentation covers the Combined Heat & Power Technology Overview and Federal Sector Deployment from Oakridge National Laboratory. The presentation is from the FUPWG Spring Meeting, held on May 22, 2013 in San Francisco, California.

282

Creating a Comprehensive Solar Water Heating Deployment Strategy  

SciTech Connect (OSTI)

This report details the results of a research conducted in 1998 and 1999 and outlines a marketing deployment plan designed for businesses interested in marketing solar water heaters in the new home industry.

Focus Marketing Services

1999-08-18T23:59:59.000Z

283

Fuel Cell Technologies Office Record 14009 ? Industry Deployed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

09 (Rev. 1) Date: 08122014 Title: Industry Deployed Fuel Cell Backup Power (BuP) Originators: Pete Devlin, Kristian Kiuru Approved by: Sunita Satyapal and Rick Farmer Date: 08...

284

FACT SHEET: SUPER-EFFICIENT EQUIPMENT AND APPLICANCE DEPLOYMENT INITIATIVE  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: SUPER-EFFICIENT EQUIPMENT AND APPLICANCE DEPLOYMENT INITIATIVE At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers pledged joint efforts to dramatically improve the energy efficiency of household appliances and other energy-using equipment - cutting energy waste, creating jobs, reducing pollution, and saving money for consumers around the world. The ministers launched the Super-efficient Equipment and Appliance Deployment (SEAD) Initiative, a

285

LET THE SUN SHINE: OPTIMAL DEPLOYMENT OF PHOTOVOLTAICS IN GERMANY  

E-Print Network [OSTI]

LET THE SUN SHINE: OPTIMAL DEPLOYMENT OF PHOTOVOLTAICS IN GERMANY Anna CRETI Jérôme JOAUG Cahier n:chantal.poujouly@polytechnique.edu hal-00751743,version1-14Nov2012 #12;Let the sun shine: optimal deployment of photovoltaics in Germany-in tari¤s to foster the di¤usion of photovoltaics is recently being rediscussed in several countries

Paris-Sud XI, Université de

286

Presentation: QER Energy Topics | Department of Energy  

Office of Environmental Management (EM)

Laboratory QER Energy Topics More Documents & Publications Presentation: High Performance Computing Applications December 3, 2013 SEAB Meeting Minutes Improving Combustion...

287

Data:D4fd87b7-b602-4c23-942c-199581ee7a18 | Open Energy Information  

Open Energy Info (EERE)

7b7-b602-4c23-942c-199581ee7a18 7b7-b602-4c23-942c-199581ee7a18 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule A5- Farm & Home Service Sector: Residential Description: Source or reference: http://psc.ky.gov/tariffs/Electric/Salt%20River%20Electric%20Coop.%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

288

Topic Segmentation with Shared Topic Detection and Alignment of Multiple Documents  

E-Print Network [OSTI]

documents, term weight 1. INTRODUCTION Many researchers have worked on topic detection and track- ing (TDTTopic Segmentation with Shared Topic Detection and Alignment of Multiple Documents Bingjun Sun,giles,jyen}@ist.psu.edu, zha@cc.gatech.edu ABSTRACT Topic detection and tracking [26] and topic segmentation [15] play

Mitra, Prasenjit

289

Special Topics and Data Reports  

U.S. Energy Information Administration (EIA) Indexed Site

Commercial Buildings Web Site. If you need assistance in viewing this page, please call (202) 586-8800 Energy Information Administration Home Page Commercial Buildings Web Site. If you need assistance in viewing this page, please call (202) 586-8800 Energy Information Administration Home Page Home > >Commercial Buildings Home > Special Topics and Data Reports Return to: CBECS Home Page 2003 Data Reports: Yellow Arrow Commercial Buildings Characteristics (HTML format) 1999 Data Reports: Yellow Arrow Commercial Buildings Characteristics (HTML format) 1995 Data Reports: Yellow Arrow Commercial Buildings Characteristics, Energy Consumption, and Expenditures (HTML format) Yellow Arrow Commercial Buildings Characteristics (HTML format) Yellow Arrow Commercial Buildings Characteristics (PDF format, 735 KB) Yellow Arrow Energy Consumption and Expenditures (HTML format) 1992 Data Reports: Yellow Arrow Commercial Buildings Characteristics (HTML format)

290

Community Renewable Energy Deployment Success Stories: Financing Renewable  

Broader source: Energy.gov (indexed) [DOE]

Community Renewable Energy Deployment Success Stories: Financing Community Renewable Energy Deployment Success Stories: Financing Renewable Energy Projects Webinar Community Renewable Energy Deployment Success Stories: Financing Renewable Energy Projects Webinar August 21, 2012 3:00PM EDT Webinar This DOE webinar will cover the challenges and successes of financing mechanisms for a solar project in Knoxville, Tennessee, and a Sacramento Municipal Utility District (SMUD) project. More details about the projects are provided below. Renewables and Sector Partnerships: Leveraging Incentives to Work for You In September 2009, the City of Knoxville was awarded more than $2 million in DOE Energy Efficiency and Conservation Block Grant funding. The city obtained approval to use $250,000 of that funding for initial investment to

291

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

292

New Orleans, Louisiana, Deployment Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

New Orleans, Louisiana, Deployment Project New Orleans, Louisiana, Deployment Project New Orleans, Louisiana, Deployment Project November 13, 2013 - 10:45am Addthis The U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are helping New Orleans, Louisiana, incorporate energy efficiency into rebuilding efforts after being devastated by Hurricanes Katrina and Rita. On August 29, 2005, Hurricane Katrina, the single largest catastrophe in U.S. history, struck the Gulf Coast, flooding 80% of New Orleans and causing $89.6 billion in damages. Three weeks later, the city was hit again by Hurricane Rita. DOE and NREL focused their assistance efforts to New Orleans in the specific areas listed below. You can also read more in the fact sheet Rising Above the Water: New Orleans Implements Energy Efficiency and

293

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 QUARTERLY NUCLEAR DEPLOYMENT SCORECARD - JULY 2013 News Updates Dominion Resources, Inc. has informed the NRC that Dominion Virginia Power will amend its COL application (COLA) to reflect the ESBWR technology by the end of 2013. In 2009 Dominion dropped the ESBWR from its COLA after failing to reach a commercial agreement with General Electric-Hitachi (GEH). A COL is expected no earlier than late 2015. Dominion Virginia Power has not yet committed to building a new nuclear unit at North Anna. NRC has determined that the latest revision to the South Texas Project COLA does not alleviate foreign interest concerns; the staff found that despite having only a 10% ownership stake in Nuclear Innovation North America LLC (NINA), Toshiba American Nuclear Energy Corporation's

294

Quarterly Nuclear Deployment Summary, January 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 Quarterly Nuclear Deployment Summary, January 2012 January 30, 2012 - 1:10pm Addthis Quarterly News The U.S. NRC voted to approve the amended AP1000 design certification on December 22, 2011. The Commission also announced the rule would be effective immediately after it was published in the Federal Register on December 30, 2011. A final rule for the GE-ABWR design certification amendment was approved and published in the Federal Register on December 16, 2011. The rule will become effective January 17, 2012. The condenser for Vogtle Unit 3 has been completed by Japan's Toshiba and began its journey from Sacheon to Savannah, Georgia on November 21. The condenser marks the first major component Toshiba has shipped for

295

Quarterly Nuclear Power Deployment Scorecard - April 2013 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Power Deployment Scorecard - April 2013 Power Deployment Scorecard - April 2013 Quarterly Nuclear Power Deployment Scorecard - April 2013 News Updates On November 20, 2012, the Department of Energy announced that it had selected the mPower America team, led by Babcock and Wilcox (B&W) partnered with Tennessee Valley Authority and Bechtel, as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. Negotiations with B&W are complete and the award is imminent. On March 11, 2013, the Department issued a follow-on solicitation open to other companies and manufacturers focused on furthering small modular reactor efficiency, operations and design. On January 10, 2013, NRC published the Final Environmental Impact Statement for the Enrico Fermi Unit 3 Combined License application. An

296

Quarterly Nuclear Deployment Scorecard - July 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 Quarterly Nuclear Deployment Scorecard - July 2012 News Updates The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months. The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to respond to outstanding technical issues and provide additional information related to post-Fukushima requirements. DOE released a funding opportunity announcement on March, 22 2012 to

297

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In

298

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

299

Energy Department Accelerates the Deployment of Advanced Vehicle  

Broader source: Energy.gov (indexed) [DOE]

Accelerates the Deployment of Advanced Vehicle Accelerates the Deployment of Advanced Vehicle Technologies with Private Industry Partnerships Energy Department Accelerates the Deployment of Advanced Vehicle Technologies with Private Industry Partnerships March 5, 2013 - 2:15pm Addthis News Media Contact (202) 586-4940 WASHINGTON - As part of the Obama Administration's commitment to speeding the transition to more sustainable energy sources that will help drive economic growth, the Energy Department today announced 16 major U.S. employers and two stakeholder groups have joined the Workplace Charging Challenge to give more American workers access to new transportation options, while another three U.S. corporations have joined the National Clean Fleets Partnership. These steps support President Obama's goal to

300

New Orleans, Louisiana, Deployment Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Orleans, Louisiana, Deployment Project Orleans, Louisiana, Deployment Project New Orleans, Louisiana, Deployment Project November 13, 2013 - 10:45am Addthis The U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are helping New Orleans, Louisiana, incorporate energy efficiency into rebuilding efforts after being devastated by Hurricanes Katrina and Rita. On August 29, 2005, Hurricane Katrina, the single largest catastrophe in U.S. history, struck the Gulf Coast, flooding 80% of New Orleans and causing $89.6 billion in damages. Three weeks later, the city was hit again by Hurricane Rita. DOE and NREL focused their assistance efforts to New Orleans in the specific areas listed below. You can also read more in the fact sheet Rising Above the Water: New Orleans Implements Energy Efficiency and

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Quarterly Nuclear Deployment Summary, January 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Deployment Summary, January 2013 Deployment Summary, January 2013 Quarterly Nuclear Deployment Summary, January 2013 January 30, 2013 - 5:59pm Addthis Quarterly Updates On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

302

Energy Department Awards $45 Million to Deploy Advanced Transportation  

Broader source: Energy.gov (indexed) [DOE]

Awards $45 Million to Deploy Advanced Awards $45 Million to Deploy Advanced Transportation Technologies Energy Department Awards $45 Million to Deploy Advanced Transportation Technologies September 4, 2013 - 10:06am Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON -- Building on President Obama's Climate Action Plan to build a 21st century transportation sector and reduce greenhouse gas emissions, the Energy Department announced today more than $45 million for thirty-eight new projects that accelerate the research and development of vehicle technologies to improve fuel efficiency, lower transportation costs and protect the environment in communities nationwide. "By partnering with universities, private industry and our national labs, the Energy Department is helping to build a strong 21st century

303

ARM - Publications: Science Team Meeting Documents: Deployment of a  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deployment of a scintillometer for optical turbulence investigation at NSA Deployment of a scintillometer for optical turbulence investigation at NSA - Barrow Moudry, Dana University of Alaska Fairbanks Sassen, Kenneth University of Alaska Fairbanks Vaucher, Gail Army Research Laboratory Zak, Bernard Sandia National Laboratories The University of Alaska Fairbanks in collaboration with the White Sands Army Research Lab deployed a reciprocal-path scintillometer to the ARM - NSA site at Barrow in fall 2004 for investigation of optical turbulence over the course of a year. The instrument consists of a transmitter and a receiver located approximately 1km apart. The instrument transmitter includes two arrays of nearIR LEDs which emit light in a 125-Hz pulsed mode. The receiver measures the temporal variability of the radiation after

304

New DOE-NASCAR Partnership Revs Deployment of Pollution Reducing  

Broader source: Energy.gov (indexed) [DOE]

DOE-NASCAR Partnership Revs Deployment of Pollution Reducing DOE-NASCAR Partnership Revs Deployment of Pollution Reducing Technologies New DOE-NASCAR Partnership Revs Deployment of Pollution Reducing Technologies September 11, 2013 - 4:44pm Addthis Dr. Michael Knotek, Deputy Undersecretary for Science and Energy at the Energy Department, delivers remarks at the NASCAR Green Summit in Chicago, where the DOE-NASCAR MOU was announced. | Photo courtesy of NASCAR. Dr. Michael Knotek, Deputy Undersecretary for Science and Energy at the Energy Department, delivers remarks at the NASCAR Green Summit in Chicago, where the DOE-NASCAR MOU was announced. | Photo courtesy of NASCAR. Dr. Michael Knotek Dr. Michael Knotek Deputy Under Secretary for Science and Energy What are the key facts? A new Memorandum of Understanding (MOU) between the Energy

305

Innovative Topics for Advanced Biofuels | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovative Topics for Advanced Biofuels Innovative Topics for Advanced Biofuels PNNL report-out presentation at the CTAB webinar on innovative topics for advanced biofuels....

306

Preliminary Fuel Cell Manufacturing R&D Topics | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Preliminary Fuel Cell Manufacturing R&D Topics Preliminary Fuel Cell Manufacturing R&D Topics Preliminary draft research topics subject to revision prior to a soliciatation being...

307

Real Options Valuation of U.S. Federal Renewable Energy Research, Development, Demonstration, and Deployment  

E-Print Network [OSTI]

Energy Research, Development, Demonstration, and Deployment Afzal S Siddiqui ? , Chris Marnay + , and Ryan H Wiser # Abstract

Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

2005-01-01T23:59:59.000Z

308

NREL: Research Participant Program - Research and Deployment Disciplines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research and Deployment Disciplines Research and Deployment Disciplines Participants in NREL programs are able to study a variety of disciplines within the Lab's research centers: National Bioenergy Center Biochemical engineering, microbiology, molecular biology, chemistry, and chemical engineering related to biomass and derived products. Energy Sciences Bioscience, chemical and materials science, computational science, physics, chemistry, and biological sciences. Electricity, Resources, and Building Systems Integration Physics, mechanical engineering (heat transfer emphasis), and architectural engineering. Hydrogen and Fuel Cells Research Hydrogen technologies and analysis. Materials and Computational Sciences Center Physics, materials science, chemistry, electrical engineering, and basic and applied research using high-performance computing and applied

309

Community Renewable Energy Deployment: City of Montpelier Project | Open  

Open Energy Info (EERE)

Montpelier Project Montpelier Project Jump to: navigation, search Name Community Renewable Energy Deployment: City of Montpelier Project Agency/Company /Organization Department of Energy Focus Area Buildings, Energy Efficiency - Central Plant, Energy Efficiency - Utility, Energy Efficiency, Greenhouse Gas, Renewable Energy, Biomass Phase Evaluate Options, Get Feedback, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly Available Publication Date 1/1/2011 Website http://www1.eere.energy.gov/co Locality Montpelier, Vermont References Community Renewable Energy Deployment: City of Montpelier Project[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview This case study describes Montpelier, Vermont's efforts under the

310

Scientific Workflows Composition and Deployment on SOA Frameworks  

SciTech Connect (OSTI)

Scientific workflows normally consist of multiple applications acquiring and transforming data, running data intensive analyses and visualizing the results for scientific discovery. To compose and deploy such scientific workflows, an SOA platform can provide integration of third-party components, services, and tools. In this paper, we present our application of Service-Oriented Architecture (SOA) to compose and deploy systems biology workflows. In developing this application, our solution uses MeDICi a middleware framework built on SOA platforms as an integration layer. We discuss our experience and lessons learnt about this solution that are generally applicable to scientific workflows in other domains.

Liu, Yan; Gorton, Ian; Wynne, Adam S.; Kulkarni, Anand V.

2011-12-12T23:59:59.000Z

311

Community Renewable Energy Deployment: Forest County Potawatomi Tribe |  

Open Energy Info (EERE)

Potawatomi Tribe Potawatomi Tribe Jump to: navigation, search Name Community Renewable Energy Deployment: Forest County Potawatomi Tribe Agency/Company /Organization US Department of Energy Sector Energy Focus Area Energy Efficiency - Central Plant, Economic Development, Forestry, Greenhouse Gas, Renewable Energy, Biomass - Anaerobic Digestion, Biomass, Solar, - Solar Pv, Biomass - Waste To Energy Phase Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly available -- Free Publication Date 11/29/2010 Website http://www1.eere.energy.gov/co Locality Forest County Potawatomi Tribe References Community Renewable Energy Deployment: Forest County Potawatomi Tribe[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References

312

Tracking topic birth and death in LDA.  

SciTech Connect (OSTI)

Most topic modeling algorithms that address the evolution of documents over time use the same number of topics at all times. This obscures the common occurrence in the data where new subjects arise and old ones diminish or disappear entirely. We propose an algorithm to model the birth and death of topics within an LDA-like framework. The user selects an initial number of topics, after which new topics are created and retired without further supervision. Our approach also accommodates many of the acceleration and parallelization schemes developed in recent years for standard LDA. In recent years, topic modeling algorithms such as latent semantic analysis (LSA)[17], latent Dirichlet allocation (LDA)[10] and their descendants have offered a powerful way to explore and interrogate corpora far too large for any human to grasp without assistance. Using such algorithms we are able to search for similar documents, model and track the volume of topics over time, search for correlated topics or model them with a hierarchy. Most of these algorithms are intended for use with static corpora where the number of documents and the size of the vocabulary are known in advance. Moreover, almost all current topic modeling algorithms fix the number of topics as one of the input parameters and keep it fixed across the entire corpus. While this is appropriate for static corpora, it becomes a serious handicap when analyzing time-varying data sets where topics come and go as a matter of course. This is doubly true for online algorithms that may not have the option of revising earlier results in light of new data. To be sure, these algorithms will account for changing data one way or another, but without the ability to adapt to structural changes such as entirely new topics they may do so in counterintuitive ways.

Wilson, Andrew T.; Robinson, David Gerald

2011-09-01T23:59:59.000Z

313

Deploying An Electronic Medical Record System in Rural Rwanda  

E-Print Network [OSTI]

Deploying An Electronic Medical Record System in Rural Rwanda Yaw Anokwa1 , Christian Allen2 asked Partners in Health to help build a national health care system. A small town named Rwinkwavu was chosen as the home of one of the first comprehensive health care systems in Africa. To help manage

Anderson, Richard

314

Federal Technology Deployment Pilot: Exterior Solid State Lighting  

Broader source: Energy.gov [DOE]

Presentationgiven at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meetingprovides an overview of the U.S. Department of Energy's Solid-State Lighting Program and an exterior solid-state lighting federal technology deployment pilot project.

315

Deploying American-Made Clean Energy Technologies in South Africa  

Office of Energy Efficiency and Renewable Energy (EERE)

The Energy Department works with American and international organizations to break down barriers to widely deploying U.S.-made clean energy technologies in countries throughout the world. Learn more about an Energy Department-supported project involving reflective cool roof surfaces, solar water heaters, and other technologies that are helping South Africa reduce energy use and carbon emissions.

316

BOOK REVIEWS The Transportation Experience: Policy, Planning, and Deploy-  

E-Print Network [OSTI]

BOOK REVIEWS CONTENTS The Transportation Experience: Policy, Planning, and Deploy- ment, by William Cities: Geocomputation in Territorial Planning, edited by Lidia Diappi. Review by Suzana Dragi...................................................................................... 1005 New Urbanism and American Planning: The Conflict of Cultures, by Emily Talen. Review by David

Levinson, David M.

317

Cut-Price Plan Offered for SDI Deployment  

Science Journals Connector (OSTI)

...being spent in trying to keep intact a plan to deploy SDI in stages...post-boost vehicle containing the warheads, which would later be released...space-based interceptors. Warheads would be tracked in space by...guided toward the incoming warheads by data sent down by the space-based...

Colin Norman

1988-10-07T23:59:59.000Z

318

Space Systems Finland 1 Deployment in the Space Sector  

E-Print Network [OSTI]

© Space Systems Finland 1 Deployment in the Space Sector #12;© Space Systems Finland 2 SW Constraints Design Requirements User Requirements SW Requirements #12;© Space Systems Finland 3 The space, but there is no viable alternative · Many requirements are not testable #12;© Space Systems Finland 4 SSF OBJECTIVES

Southampton, University of

319

SCOR WG meeting November 2000 Innovative platform & deployment approaches  

E-Print Network [OSTI]

-OPC (J Campbell) #12;Autonomous Surface Craft t SASS from SeaSpeed Engineering Ltd., UK Semi-submersibleSCOR WG meeting November 2000 Innovative platform & deployment approaches: Challenges, potential potential benefits tHow might present prototype platforms deliver these benefits? tWhat are the likely

Griffiths, Gwyn

320

Orthogonal Capability Building Blocks for Flexible AHS Deployment  

E-Print Network [OSTI]

or detection), and system vigilance (trusting or vigilant). A mapping technique depicts deployment paths System (AHS) was a user service that provides fully automated vehicle control on dedicated highway lanes Institute for Complex Engineered Systems Robotics Institute 5000 Forbes Avenue 5000 Forbes Avenue Pittsburgh

Koopman, Philip

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Alternative Schemes for Dynamic Secure VPN Deployment in UMTS  

Science Journals Connector (OSTI)

Three alternative schemes for secure Virtual Private Network (VPN) deployment over the Universal Mobile Telecommunication System (UMTS) are proposed and analyzed. The proposed schemes enable a mobile node to voluntarily establish an IPsec-based secure ... Keywords: IKE, IPsec, NAT, UMTS, VPN, mobile Internet, privacy, security

Christos Xenakis; Lazaros Merakos

2006-01-01T23:59:59.000Z

322

Commercial Building Demonstration and Deployment Overview- 2014 BTO Peer Review  

Broader source: Energy.gov [DOE]

Presentation: Kristen Taddonio, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Commercial Building Demonstration and Deployment activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

323

Data:2752013a-2c1d-4a7b-83c7-4a43879eac5e | Open Energy Information  

Open Energy Info (EERE)

2013a-2c1d-4a7b-83c7-4a43879eac5e 2013a-2c1d-4a7b-83c7-4a43879eac5e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 400 W Mercury Vapor- Nonwood Sector: Lighting Description: 139 To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Nonwood; Enclosed Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

324

Data:B27e3392-93ff-4d36-8d2f-f7b431083edf | Open Energy Information  

Open Energy Info (EERE)

e3392-93ff-4d36-8d2f-f7b431083edf e3392-93ff-4d36-8d2f-f7b431083edf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cimarron Electric Coop Effective date: 2008/10/01 End date if known: Rate name: Large Power (LP-1), Rate 8 Sector: Industrial Description: AVAILABILITY: Available to industrial power consumers using service under term contract, when service is taken at one location through one meter. No standby, resale or auxiliary permitted. The minimum bill shall be $350.00 Source or reference: ISU Documentation Source Parent: Comments Billing Adjustments: (a) Power Cost Adjustment (Reference Sheet No.1) (b) Tax Adjustment (Reference Sheet No.1)

325

Data:2aed2a7b-e7d1-4615-91d0-c267ad69181c | Open Energy Information  

Open Energy Info (EERE)

a7b-e7d1-4615-91d0-c267ad69181c a7b-e7d1-4615-91d0-c267ad69181c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Street Lighting District Owned 175 MV Sector: Lighting Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

326

Data:Fb2fcd3e-9765-4b35-9a79-162a7b7bad12 | Open Energy Information  

Open Energy Info (EERE)

e-9765-4b35-9a79-162a7b7bad12 e-9765-4b35-9a79-162a7b7bad12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: 2012/08/01 End date if known: Rate name: 100 Watt HPS 34 kWh Cooperative Owned Sector: Lighting Description: Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/security_lights_2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

327

Data:Ea67650e-cd43-4250-9845-368dea7b0af0 | Open Energy Information  

Open Energy Info (EERE)

7650e-cd43-4250-9845-368dea7b0af0 7650e-cd43-4250-9845-368dea7b0af0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp- Area Lighting Luminaire (400w) Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

328

Data:Fb434813-28eb-44a4-ae2e-7b95e553e6e1 | Open Energy Information  

Open Energy Info (EERE)

Fb434813-28eb-44a4-ae2e-7b95e553e6e1 Fb434813-28eb-44a4-ae2e-7b95e553e6e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2010/07/09 End date if known: Rate name: 2 Lightinhg service to existing instalation only - schedule SHL - MV - 400W (15000 Lumen) Sector: Lighting Description: This rate schedule is applicable under the regular terms and conditions of Company to Street and Highway Lighting Service, Area Lighting Service, and Residential Subdivision Lighting (existing installations or extensions thereof) only. This rate is not applicable to new installations.

329

Data:Dfbb2c41-7784-4206-8f7b-787a493d01dc | Open Energy Information  

Open Energy Info (EERE)

Dfbb2c41-7784-4206-8f7b-787a493d01dc Dfbb2c41-7784-4206-8f7b-787a493d01dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Excelsior Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting Service- 100W HPS Sector: Lighting Description: Applicable only to outdoor lighting by means of ballast operated lamp fixtures that do not require a dedicated transformer and street lighting service by means of ballast operated lamp fixtures, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Documentation Source Parent: Comments

330

Data:4f30dadc-35dd-4e7f-a7b6-b1bba01e2e9e | Open Energy Information  

Open Energy Info (EERE)

dadc-35dd-4e7f-a7b6-b1bba01e2e9e dadc-35dd-4e7f-a7b6-b1bba01e2e9e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Arapahoe, Nebraska (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: ISU Documentation Rate Binder Ted #6 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

331

Data:748b92dd-8dfe-40a0-a4ef-457d6e7b6fec | Open Energy Information  

Open Energy Info (EERE)

dd-8dfe-40a0-a4ef-457d6e7b6fec dd-8dfe-40a0-a4ef-457d6e7b6fec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Street Lighting Service- 150W HPS Post Top Decorative Underground Aluminum Sector: Lighting Description: Available for lighting streets and roadways, whether public or private, which are thoroughfares for normal flow of vehicular traffic. This rate is generally available to governmental agencies. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181 Source Parent:

332

Data:7f4f9b7b-e46d-4a4a-949e-00237b587c52 | Open Energy Information  

Open Energy Info (EERE)

f9b7b-e46d-4a4a-949e-00237b587c52 f9b7b-e46d-4a4a-949e-00237b587c52 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eau Claire Electric Coop Effective date: 2012/05/21 End date if known: Rate name: PEAK ALERT SERVICE Sector: Industrial Description: Availability Available under established rules and regulations for single or three-phase service. Determination of feasibility and availability shall be made by the Cooperative for each request for electric power supply to loads in the Cooperative's service area. A contract will be required for each such service, which establishes conditions of service.

333

Data:590db6b1-68f4-4ac7-b099-2988881ecaeb | Open Energy Information  

Open Energy Info (EERE)

b1-68f4-4ac7-b099-2988881ecaeb b1-68f4-4ac7-b099-2988881ecaeb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2012/12/01 End date if known: Rate name: GSA-3 Sector: Commercial Description: If the higher of (a) the customer's currently effective contract demand or (b) its highest billing demand during the latest 12-month period is greater than 1,000 kW: Source or reference: http://www.nespower.com/documents/GSADec12.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

334

Data:9ee663ec-1aea-48f7-b46e-0bd579f6f55b | Open Energy Information  

Open Energy Info (EERE)

ec-1aea-48f7-b46e-0bd579f6f55b ec-1aea-48f7-b46e-0bd579f6f55b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Small Industrial General Service Multi-Phase Sector: Industrial Description: Applicable:To commercial, industrial, public buildings and other services not eligible under other rate rate schedules where measured demand is less than 50 kW at all times. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/8/ Source Parent: Comments Applicability Demand (kW)

335

Data:8800fd6e-338f-4fe3-b852-cd7b2cf87284 | Open Energy Information  

Open Energy Info (EERE)

fd6e-338f-4fe3-b852-cd7b2cf87284 fd6e-338f-4fe3-b852-cd7b2cf87284 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Municipal and Highway Lighting - Sodium Vapor 400W, Schedule SL Sector: Lighting Description: Available in OTEC service territory for OTEC-owned municipal and highway lighting installed on existing facilities, subject to policies as established by the Board of Directors. Source or reference: http://www.otecc.com/rates.aspx Source Parent: Comments Rate is for photoelectric-operated fixtures operating approximately 4,100 hours per year.

336

Data:9ce73e7b-c584-4201-8904-e9871b444d41 | Open Energy Information  

Open Energy Info (EERE)

3e7b-c584-4201-8904-e9871b444d41 3e7b-c584-4201-8904-e9871b444d41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Lamp and Fixture on Existing Pole - 200 Watt SV Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

337

Data:49384929-785a-49a7-b66c-bb5f58a16bd0 | Open Energy Information  

Open Energy Info (EERE)

85a-49a7-b66c-bb5f58a16bd0 85a-49a7-b66c-bb5f58a16bd0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Etna Green, Indiana (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: 1500 watt Quartz Sector: Lighting Description: Source or reference: http://www.timesuniononline.com/print.asp?ArticleID=50294&SectionID=52&SubSectionID=277 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

338

Data:C6de82c4-a527-4dd7-b43d-6aaaff24e9b1 | Open Energy Information  

Open Energy Info (EERE)

2c4-a527-4dd7-b43d-6aaaff24e9b1 2c4-a527-4dd7-b43d-6aaaff24e9b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting EMN 50000 Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

339

Data:2611889e-86b5-4604-a7b0-3645d7a7fdfd | Open Energy Information  

Open Energy Info (EERE)

11889e-86b5-4604-a7b0-3645d7a7fdfd 11889e-86b5-4604-a7b0-3645d7a7fdfd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: IRRIGATION - RATE CLASS 38 Sector: Commercial Description: Line Retention. Notice: Deadline for Irrigation Rate changes is April 1st. Source or reference: http://www.custerpower.com/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

340

Data:9b3885e1-f78e-48c9-827f-4eae397aa7b9 | Open Energy Information  

Open Energy Info (EERE)

e1-f78e-48c9-827f-4eae397aa7b9 e1-f78e-48c9-827f-4eae397aa7b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Benton County Effective date: 2013/05/01 End date if known: Rate name: SMSB Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:766452be-0ac9-47b3-accb-7b30c6be754a | Open Energy Information  

Open Energy Info (EERE)

2be-0ac9-47b3-accb-7b30c6be754a 2be-0ac9-47b3-accb-7b30c6be754a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Power Co (Louisiana) Effective date: 2013/03/01 End date if known: Rate name: MV - Closed Offerings - 175 Watt Mercury Vapor Sector: Lighting Description: Source or reference: https://www.swepco.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

342

Data:5d3b0cda-7b7e-4272-b1ab-e48373d258bc | Open Energy Information  

Open Energy Info (EERE)

b0cda-7b7e-4272-b1ab-e48373d258bc b0cda-7b7e-4272-b1ab-e48373d258bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ohio Edison Co Effective date: 2009/01/23 End date if known: Rate name: RS (Residential Service) Sector: Residential Description: Available for residential service to installations served through one meter for each family unit in a residence or apartment. Source or reference: https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/Ohio/tariffs/OE-2012-Electric-Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

343

Data:93b0e930-5fbc-49de-aa53-01c7b5806252 | Open Energy Information  

Open Energy Info (EERE)

0-5fbc-49de-aa53-01c7b5806252 0-5fbc-49de-aa53-01c7b5806252 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2011/01/01 End date if known: Rate name: RHW32 Sector: Commercial Description: Source or reference: http://www.adamsec.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

344

Data:0b1545f7-8058-45b8-8dc9-7bd649e7b271 | Open Energy Information  

Open Energy Info (EERE)

f7-8058-45b8-8dc9-7bd649e7b271 f7-8058-45b8-8dc9-7bd649e7b271 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE-Mercury Vapor, Open 175 W Sector: Lighting Description: 7000 Lumens, 175 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

345

Data:5d6fa5d7-b4c0-4b93-b400-eea4e517fc36 | Open Energy Information  

Open Energy Info (EERE)

d7-b4c0-4b93-b400-eea4e517fc36 d7-b4c0-4b93-b400-eea4e517fc36 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NH Effective date: 2012/01/01 End date if known: Rate name: Rate GV, Commercial and Industrial INDUSTRIAL Sector: Commercial Description: Source or reference: http://www.psnh.com/RatesTariffs/Business/Small-Business-Rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

346

Data:5153dc85-7b21-4906-9245-5cd5d7e85826 | Open Energy Information  

Open Energy Info (EERE)

5-7b21-4906-9245-5cd5d7e85826 5-7b21-4906-9245-5cd5d7e85826 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: General Service- Single Phase Sector: Commercial Description: To any nonresidential customer for lighting, heating, and power purposes, and where the customer's billing demand does not exceed 100 KW during any three summer months or 200 KW in any four months of a 12 consecutive month period. Source or reference: http://www.loup.com/docs/customersvc/LG-1-Rates2013.pdf Source Parent:

347

Data:33c55341-9843-4345-9c7b-228f082c8d3c | Open Energy Information  

Open Energy Info (EERE)

341-9843-4345-9c7b-228f082c8d3c 341-9843-4345-9c7b-228f082c8d3c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp-Post Top Luminaire (175w) Colonial Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

348

Data:7540ce6c-0953-433f-a345-7b6cf35ee505 | Open Energy Information  

Open Energy Info (EERE)

ce6c-0953-433f-a345-7b6cf35ee505 ce6c-0953-433f-a345-7b6cf35ee505 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Parke County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: Rate Rider DG (Rate 11) Distributed Generation Rider Option 2 Sector: Commercial Description: AVAILABILITY: This Rate Schedule is available to any Member of the Parke County REMC (the "Cooperative") that is currently being billed under the Residential Electric Service Rate who have a qualified distributed generation system ("DG System") of not more than 10 kW and who desire to interconnect such DG System with the Cooperative's distribution system.

349

Data:2d33d95b-9212-4743-bd8d-7b2e3fa4d43b | Open Energy Information  

Open Energy Info (EERE)

d33d95b-9212-4743-bd8d-7b2e3fa4d43b d33d95b-9212-4743-bd8d-7b2e3fa4d43b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2009/02/24 End date if known: Rate name: Schedule LD (Three Phase) - Load Development Rate (Over 25kW) Sector: Commercial Description: Available for three phase small commercial load for all uses including lighting, heating and power subject to the established rules and regulations of the seller. Source or reference: Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

350

Data:4bcce9b7-b421-4224-96a4-b4d7a412c78d | Open Energy Information  

Open Energy Info (EERE)

bcce9b7-b421-4224-96a4-b4d7a412c78d bcce9b7-b421-4224-96a4-b4d7a412c78d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (400W SV Directional Flood Lighting on existing 40 ft. wood Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

351

Data:6cab8536-ddcc-4249-b0ef-c75b16b7b741 | Open Energy Information  

Open Energy Info (EERE)

cab8536-ddcc-4249-b0ef-c75b16b7b741 cab8536-ddcc-4249-b0ef-c75b16b7b741 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Enosburg Falls, Vermont (Utility Company) Effective date: 2010/10/01 End date if known: Rate name: Station Service - Rate 6 - Less than 250 kW Sector: Commercial Description: This rate is available for single and three phase electric service at secondary voltage within the service territory of the village of Enosburg. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

352

Data:Aa872b10-5629-4e11-b7c5-28cba759c7b9 | Open Energy Information  

Open Energy Info (EERE)

b10-5629-4e11-b7c5-28cba759c7b9 b10-5629-4e11-b7c5-28cba759c7b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Parking and Street 1000 W Fiberglass Pole Sector: Lighting Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

353

Data:65e9a052-e7b5-4a71-a57c-5b9047ea166b | Open Energy Information  

Open Energy Info (EERE)

2-e7b5-4a71-a57c-5b9047ea166b 2-e7b5-4a71-a57c-5b9047ea166b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 100W HIGH PRESSURE SODIUM COACH LANTERN Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

354

Data:20839d6a-4331-4197-b78d-5a7b5a1c645b | Open Energy Information  

Open Energy Info (EERE)

a-4331-4197-b78d-5a7b5a1c645b a-4331-4197-b78d-5a7b5a1c645b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Industrial Delivery Point Service (Over 2500 kW) Sector: Industrial Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. All kvar in excess of 33% (95% power factor) of billing demand will be billed at the rate of $0.90 per kvar. Source or reference: http://www.singingriver.com/Files/LP-1.pdf Source Parent: Comments Applicability

355

Data:330d7e27-910c-48f7-b61c-cc2c7ca27454 | Open Energy Information  

Open Energy Info (EERE)

e27-910c-48f7-b61c-cc2c7ca27454 e27-910c-48f7-b61c-cc2c7ca27454 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canoochee Electric Member Corp Effective date: 2006/07/01 End date if known: Rate name: Security Lighting Service- SL (175W MV) Sector: Lighting Description: To individual consumers for dusk to dawn out door lighting service in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

356

Data:48f800fa-1c0f-4e65-af12-7b8f44d19b8f | Open Energy Information  

Open Energy Info (EERE)

00fa-1c0f-4e65-af12-7b8f44d19b8f 00fa-1c0f-4e65-af12-7b8f44d19b8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting 250 W HPS: Unmetered Sector: Lighting Description: Available to individual consumers and municipalities, towns, and villages for dusk to dawn outdoor lighting in close proximity to existing overhead secondary circuits. South Dakota Sales Tax is applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

357

Data:9f9494ae-1499-40a4-aae4-7acf0fd02b7b | Open Energy Information  

Open Energy Info (EERE)

494ae-1499-40a4-aae4-7acf0fd02b7b 494ae-1499-40a4-aae4-7acf0fd02b7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of High Point, North Carolina (Utility Company) Effective date: 2012/07/06 End date if known: Rate name: Residential with Water Heating Sector: Residential Description: Available only to residential customers in residences, condominiums, mobile homes, or individually metered apartments, which provide independent and permanent facilities, complete for living, sleeping, eating, cooking, and sanitation. In addition, all energy required for all water heating must be supplied electrically, and all electric energy used in such dwelling must be recorded through a single meter.

358

Data:7f76d1f5-7a18-45b7-b0cf-84c38c414690 | Open Energy Information  

Open Energy Info (EERE)

-7a18-45b7-b0cf-84c38c414690 -7a18-45b7-b0cf-84c38c414690 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc Effective date: 2012/03/27 End date if known: Rate name: URBAN STREET LIGHTING SERVICE Sodium Lamp 100W Sector: Lighting Description: Available to cities of Manter, Moscow, Rolla and Ulysses for municipal outdoor lighting. This schedule is not applicable to flood lighting installations, private streets, roadway or yard lighting installations for individual consumers, or to lighting for athletic fields, swimming pools, parking lots or other similar projects. This rate applies to accounting schedule 444 Street lights.

359

Data:Da9e4271-9e5b-4a83-ab28-d7b18d25054f | Open Energy Information  

Open Energy Info (EERE)

1-9e5b-4a83-ab28-d7b18d25054f 1-9e5b-4a83-ab28-d7b18d25054f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cedarburg Light & Water Comm Effective date: 2011/01/01 End date if known: Rate name: Residential Optional Time-of-Day Rate 7am-7pm Sector: Residential Description: Source or reference: http://www.cedarburglightandwater.com/customer_services/default.asp?CategoryNumber=3&SubcategoryNumber=1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

360

Data:403e2212-7413-4e10-ab7b-484d37e2ca45 | Open Energy Information  

Open Energy Info (EERE)

12-7413-4e10-ab7b-484d37e2ca45 12-7413-4e10-ab7b-484d37e2ca45 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: GENERAL RESIDENTIAL SERVICE Sector: Residential Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:86bf1618-81cd-486f-a25a-8d7b3e9a7cd8 | Open Energy Information  

Open Energy Info (EERE)

-81cd-486f-a25a-8d7b3e9a7cd8 -81cd-486f-a25a-8d7b3e9a7cd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Metered Security Light - 250 HPS Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

362

Data:26ba2c1f-739e-4b7b-aabb-27ccb54d2a19 | Open Energy Information  

Open Energy Info (EERE)

f-739e-4b7b-aabb-27ccb54d2a19 f-739e-4b7b-aabb-27ccb54d2a19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Hallettsville, Texas (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: Ball Field Lighting- Softball Field Sector: Lighting Description: Softball field lighting = $12.50 per hour Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

363

Data:370ec1ad-f00c-40b2-b214-b95fe55b9b7b | Open Energy Information  

Open Energy Info (EERE)

ad-f00c-40b2-b214-b95fe55b9b7b ad-f00c-40b2-b214-b95fe55b9b7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Chambersburg, Pennsylvania (Utility Company) Effective date: 2004/05/03 End date if known: Rate name: Area Lighting Rate- (1000W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

364

Data:50d22049-6b70-42de-9def-d6345120be7b | Open Energy Information  

Open Energy Info (EERE)

049-6b70-42de-9def-d6345120be7b 049-6b70-42de-9def-d6345120be7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Washington, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Residential- Outside Corporate Limits- Three-Phase Sector: Residential Description: Service under this Schedule is available for separately metered and billed supply of electricity to single family residences, including residential farms where the farm uses are not taken through a separate meter, and common area residential lighting strictly used for residence owned decorative or security lighting for electric service delivered to premises located outside the corporate limits of the City of Washington.

365

Data:1d6371be-9b6d-47c7-b132-c3ca4208e363 | Open Energy Information  

Open Energy Info (EERE)

be-9b6d-47c7-b132-c3ca4208e363 be-9b6d-47c7-b132-c3ca4208e363 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (175W MV-Open/Closed 4) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

366

Data:76bebf33-2310-4d16-8807-9a5701c74c7b | Open Energy Information  

Open Energy Info (EERE)

bebf33-2310-4d16-8807-9a5701c74c7b bebf33-2310-4d16-8807-9a5701c74c7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Coop Inc (New Mexico) Effective date: 2007/07/01 End date if known: Rate name: Commercial Seasonal Sector: Commercial Description: Source or reference: http://www.swec-coop.org/rates-801-GS-S.cfm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

367

Data:64674e9f-ea7b-4a06-aeb6-ac9005c81b94 | Open Energy Information  

Open Energy Info (EERE)

f-ea7b-4a06-aeb6-ac9005c81b94 f-ea7b-4a06-aeb6-ac9005c81b94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: 2014/07/01 Rate name: Electric Renewable Energy Credit Rider - RECR - 1 - Wind and Biomass - 5-Years-Fixed Sector: Description: Source or reference: http://www.newtonnc.gov/departments/finance/finance_documents.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

368

Data:700028a7-b2a8-40ec-95f5-63bc15d7821f | Open Energy Information  

Open Energy Info (EERE)

a7-b2a8-40ec-95f5-63bc15d7821f a7-b2a8-40ec-95f5-63bc15d7821f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Lighting - DSV 100W (Granville) Direct Burial Sector: Lighting Description: Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

369

Data:6911d07c-7b7f-4e1a-b653-8d35a159acff | Open Energy Information  

Open Energy Info (EERE)

c-7b7f-4e1a-b653-8d35a159acff c-7b7f-4e1a-b653-8d35a159acff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 23ft fiberlass pole with shroud Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

370

Data:B4a20f57-ff5f-4407-b7b1-37ed943d1045 | Open Energy Information  

Open Energy Info (EERE)

7-ff5f-4407-b7b1-37ed943d1045 7-ff5f-4407-b7b1-37ed943d1045 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orrville, Ohio (Utility Company) Effective date: 2006/01/01 End date if known: Rate name: 150 Watt High Pressure Sodium Lamp Metered Sector: Lighting Description: Source or reference: http://www.orrutilities.com/electric/rates.shtml Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

371

Data:718ab30f-5bf4-4fc7-b49d-14c4126d0588 | Open Energy Information  

Open Energy Info (EERE)

ab30f-5bf4-4fc7-b49d-14c4126d0588 ab30f-5bf4-4fc7-b49d-14c4126d0588 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Large General Service, Optional Time-of-Use (LT) Rate Demand greater than 25 KW Sector: Industrial Description: This rate is available upon written request to large general service customers who agree to take service hereunder for a period of not less than 12 months. Source or reference: https://www.burlingtonelectric.com/page.php?pid=49&name=commercial_rates

372

Data:C8ffd874-e95a-4c9e-8250-6299cf7b5832 | Open Energy Information  

Open Energy Info (EERE)

74-e95a-4c9e-8250-6299cf7b5832 74-e95a-4c9e-8250-6299cf7b5832 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Street Light MH 400 W 30' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

373

Data:1db1e165-4529-44eb-baff-9571a1e1ca7b | Open Energy Information  

Open Energy Info (EERE)

65-4529-44eb-baff-9571a1e1ca7b 65-4529-44eb-baff-9571a1e1ca7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sharyland Utilities LP Effective date: 2010/07/13 End date if known: Rate name: Lighting Service unmetered company owned SV Sector: Lighting Description: This Rate Schedule is applicable to Electric Service for street and security lighting purposes. This Rate Schedule is not applicable to temporary, shared, standby, supplementary, maintenance or resale service. Source or reference: http://www.su-power.com/docs/SharylandUtilities_Tariff.pdf Source Parent: Comments This rate is subject to all applicable billing adjustments (Power Cost Recovery Factor (PCRF) - General, Sales Tax, Meter Error Adjustment, Power Factor Adjustment)

374

Data:B15abf7b-2892-474c-a3cb-c5c8dbbd98ab | Open Energy Information  

Open Energy Info (EERE)

abf7b-2892-474c-a3cb-c5c8dbbd98ab abf7b-2892-474c-a3cb-c5c8dbbd98ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Minimum Annual Charge(Three Phase) Sector: Description: For three-phase irrigation and pumping rate schedules, the minimum annual charge shall be $165 if connected horsepower are 15 or less and 20 X HP dollars if connected horsepower are in excess of fifteen horsepower. Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW)

375

Data:62f0dfc1-cc60-46bc-9e56-e7b425b2e149 | Open Energy Information  

Open Energy Info (EERE)

dfc1-cc60-46bc-9e56-e7b425b2e149 dfc1-cc60-46bc-9e56-e7b425b2e149 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: Commercial Service High Density-Three Phase Sector: Commercial Description: * Available for commercial customers up to 50 kVA of transformer capacity. Further capacity available at the discretion of the Cooperative, up to 150 kVA. Subject to power cost adjustment and tax adjustment Source or reference: ISU Documentation Rate Binder Kelly # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

376

Data:E07f1adb-4fd8-4279-8a0b-7b2218929f74 | Open Energy Information  

Open Energy Info (EERE)

f1adb-4fd8-4279-8a0b-7b2218929f74 f1adb-4fd8-4279-8a0b-7b2218929f74 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2013/01/01 End date if known: Rate name: Rate MH - Underground Modern Fixture 400 Watt Sector: Lighting Description: Source or reference: www.uinet.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

377

Data:76d1e721-a7b9-411c-abfe-898c76e312d7 | Open Energy Information  

Open Energy Info (EERE)

21-a7b9-411c-abfe-898c76e312d7 21-a7b9-411c-abfe-898c76e312d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Farm and Rice Dryers Sector: Residential Description: Available to Members of the Cooperative for service farm rice dryers. Source or reference: www.jdec.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

378

Data:462d4ec7-b04f-49ef-81ee-e915945af04e | Open Energy Information  

Open Energy Info (EERE)

ec7-b04f-49ef-81ee-e915945af04e ec7-b04f-49ef-81ee-e915945af04e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Service-Wooden Poles (30' length) (T) Sector: Lighting Description: This rate is available to any customer for non-metered outdoor lighting service. Source or reference: http://www.mainepublicservice.com/media/40542/rate%20t%20010112.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

379

Data:69bbefe0-b453-4fb5-b004-4e973c7b0478 | Open Energy Information  

Open Energy Info (EERE)

bbefe0-b453-4fb5-b004-4e973c7b0478 bbefe0-b453-4fb5-b004-4e973c7b0478 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elk Point, South Dakota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Municipal Service Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

380

Data:B64db9d2-d219-4be8-8945-4b7b6ea74a61 | Open Energy Information  

Open Energy Info (EERE)

db9d2-d219-4be8-8945-4b7b6ea74a61 db9d2-d219-4be8-8945-4b7b6ea74a61 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Carmel Public Utility Co Effective date: End date if known: Rate name: Light - 400 watt MV Sector: Lighting Description: If the customer takes no other electric service from Company, a customer charge will be incurred as follows: $0.00 until the later of January 1, 1990 or the effective date of House Bill 362; $4.50 thereafter. Source or reference: http://www.mtcpu.com/includes/tariff_electric.htm?t=Residential_Electric_Space_Heating_Service Source Parent: Comments Applicability

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:9b51c4e3-368e-4492-abd8-c7b9f1632df8 | Open Energy Information  

Open Energy Info (EERE)

e3-368e-4492-abd8-c7b9f1632df8 e3-368e-4492-abd8-c7b9f1632df8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Okanogan County Effective date: 2011/12/01 End date if known: Rate name: Residential Service Schedule No. 2 Sector: Residential Description: To each individual customer/family residing in a single family dwelling or multiple family building, and to a farm which processes only its own products. The single meter on a farm may serve buildings used only for the single farm. The maximum service provided under this schedule is 600 amperes. Minimum Energy Charge: $20.00 per month

382

Data:11ffcd81-3241-484a-b7b3-bac27985d9fd | Open Energy Information  

Open Energy Info (EERE)

ffcd81-3241-484a-b7b3-bac27985d9fd ffcd81-3241-484a-b7b3-bac27985d9fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 100 HIGH PRESSURE SODIUM ACORN Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

383

Data:1f029483-379f-4568-ac06-8bd5cb1ac7b0 | Open Energy Information  

Open Energy Info (EERE)

3-379f-4568-ac06-8bd5cb1ac7b0 3-379f-4568-ac06-8bd5cb1ac7b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: STREET, HIGHWAY AND AREA LIGHTING: 100 Watt HPS Sector: Lighting Description: This rate applies when all fixtures are mounted on Holy Cross wood poles, either primary or secondary. Source or reference: http://www.holycross.com/about-us/rates-charges Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

384

Data:B6b6f430-a35c-4060-8c7e-189783e7b377 | Open Energy Information  

Open Energy Info (EERE)

b6f430-a35c-4060-8c7e-189783e7b377 b6f430-a35c-4060-8c7e-189783e7b377 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 175 W Mercury Vapor- Nonwood Sector: Lighting Description: To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Nonwood; Open Refractor Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

385

Data:56dd8b89-9ec3-4da7-b115-0f494067cb5b | Open Energy Information  

Open Energy Info (EERE)

-9ec3-4da7-b115-0f494067cb5b -9ec3-4da7-b115-0f494067cb5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ozarks Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: LTG-MUN - 175 Watt MVL - Unshielded Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

386

Data:2f7dc82b-736b-46c0-b96b-ab7a7b948f04 | Open Energy Information  

Open Energy Info (EERE)

b-736b-46c0-b96b-ab7a7b948f04 b-736b-46c0-b96b-ab7a7b948f04 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - L (B) Sector: Lighting Description: Large light, 20,000 Lumens fixture mounted on a Cooperative pole. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments 87 kWh/month estimate. $10.25 fixed monthly is per customer which is added to a $3.50/customer/month for the cooperatives pole (if necessary). Plus current month's Power Cost Adjustment and applicable taxes.

387

Data:Af84b7b2-2185-4678-aef4-56f54a1074df | Open Energy Information  

Open Energy Info (EERE)

4b7b2-2185-4678-aef4-56f54a1074df 4b7b2-2185-4678-aef4-56f54a1074df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: General Service Secondary Single Phase Sector: Commercial Description: Customer & Facilities Charge + Energy Charge + All Riders (if applicable) + Service Fees (if applicable) + City Dividend for Utility Ownership + Sales Tax (if applicable); based on the RATE in effect and the System's Service Regulations. Plus, for billing periods less than 27 days, on the customer's first and final BILLS, a per day credit times the difference between 30 and the actual number of days in the BILLING PERIOD.

388

Data:Edc9061a-dbcf-4e0b-a18a-7b38ef40ba47 | Open Energy Information  

Open Energy Info (EERE)

Edc9061a-dbcf-4e0b-a18a-7b38ef40ba47 Edc9061a-dbcf-4e0b-a18a-7b38ef40ba47 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2011/11/01 End date if known: Rate name: General Service Schedule GS-12 Sector: Commercial Description: Source or reference: http://www.waltonemc.com/residential/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

389

Data:5b2df991-869e-4d81-b6e7-374818a7b6fa | Open Energy Information  

Open Energy Info (EERE)

91-869e-4d81-b6e7-374818a7b6fa 91-869e-4d81-b6e7-374818a7b6fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Inter County Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule C-1 Industrial Rate Sector: Industrial Description: Source or reference: http://www.intercountyenergy.net/content/energy-rates-net-metering Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

390

Data:24cd3919-a3f9-4c46-bfed-3d7b62220bc5 | Open Energy Information  

Open Energy Info (EERE)

a3f9-4c46-bfed-3d7b62220bc5 a3f9-4c46-bfed-3d7b62220bc5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 250 MH, Flood Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

391

Data:424a30a1-d12a-4cb7-b0f4-9285e6014872 | Open Energy Information  

Open Energy Info (EERE)

2a-4cb7-b0f4-9285e6014872 2a-4cb7-b0f4-9285e6014872 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Market Based Rate Schedule Sector: Industrial Description: Available to all consumers within the Utility's service area who have entered into a contract, with a term of at least one year, for demand of 1,000 kW or more. Service shall be supplied through a point of delivery and measured through primary metering. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW)

392

Data:3bea7b54-9ad3-463f-ab83-f2baaa3558a4 | Open Energy Information  

Open Energy Info (EERE)

bea7b54-9ad3-463f-ab83-f2baaa3558a4 bea7b54-9ad3-463f-ab83-f2baaa3558a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 100W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

393

Data:D3acf85e-e76b-40e7-b6c8-d3637cee692b | Open Energy Information  

Open Energy Info (EERE)

acf85e-e76b-40e7-b6c8-d3637cee692b acf85e-e76b-40e7-b6c8-d3637cee692b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Electronically Read Irrigation- Single Phase Sector: Commercial Description: Because this tariff requires that Sun River Electric install additional equipment, enrollment may be limited. Source or reference: http://www.sunriverelectric.coop/Membership/Billing_Rates_and_Fees/Irrigation/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

394

Data:5e2ffe38-ce89-4907-a33c-7b7bc72d43f1 | Open Energy Information  

Open Energy Info (EERE)

-ce89-4907-a33c-7b7bc72d43f1 -ce89-4907-a33c-7b7bc72d43f1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: HS Heat Storage Residential Sector: Residential Description: Maximum 4000 kwh Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

395

Data:85b551b3-4f4d-490c-bc0d-d173ef850e7b | Open Energy Information  

Open Energy Info (EERE)

51b3-4f4d-490c-bc0d-d173ef850e7b 51b3-4f4d-490c-bc0d-d173ef850e7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Directional Lighting MH 1000 W Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

396

Data:43ea3a54-9ca6-4b7b-9222-b6d9069d6acb | Open Energy Information  

Open Energy Info (EERE)

a54-9ca6-4b7b-9222-b6d9069d6acb a54-9ca6-4b7b-9222-b6d9069d6acb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barnesville, Georgia (Utility Company) Effective date: 2011/11/01 End date if known: Rate name: Security Lighting Service 400 W MH Sector: Lighting Description: To unmetered dusk-to-down electric service provided by high pressure by high pressure sodium vapor luminaries supported by short brackets and mounted on either the city's existing wood poles or poles owned by the customer which conform to the city's specifications. Source or reference: Rate Binder # 2 Source Parent:

397

Data:17e6438f-b0d1-4fef-a329-a7b308aa4fd6 | Open Energy Information  

Open Energy Info (EERE)

38f-b0d1-4fef-a329-a7b308aa4fd6 38f-b0d1-4fef-a329-a7b308aa4fd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: General Service (Extra Large) Sector: Industrial Description: Applicable for customers whose monthly demand is 3,000 KW or more for three consecutive month in any continuous 12 month period ending with the current month. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

398

Data:15d42acc-7b70-4638-bcb3-65d1a18671c7 | Open Energy Information  

Open Energy Info (EERE)

acc-7b70-4638-bcb3-65d1a18671c7 acc-7b70-4638-bcb3-65d1a18671c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Industrial Sector: Industrial Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

399

Data:8c06d681-f62f-4fc4-be00-7b3011463681 | Open Energy Information  

Open Energy Info (EERE)

81-f62f-4fc4-be00-7b3011463681 81-f62f-4fc4-be00-7b3011463681 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kirkwood, Missouri (Utility Company) Effective date: 2011/10/31 End date if known: Rate name: Class GS-A (Small General Service) Sector: Commercial Description: Source or reference: http://www.kirkwoodmo.org/mm/files/CODEofORDINANCES/Chapter%2023%20-10-11.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

400

Data:Bcf25f00-7fce-4bb7-b23a-f9576993f97d | Open Energy Information  

Open Energy Info (EERE)

0-7fce-4bb7-b23a-f9576993f97d 0-7fce-4bb7-b23a-f9576993f97d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Street Lighting Service STL-8 (400W HPS) Sector: Lighting Description: Applicable to municipal or local governmental street lighting service by means of mercury vapor or high pressure sodium lamps. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:3b8d6012-8dbf-4cf4-b312-c544e73bb7b3 | Open Energy Information  

Open Energy Info (EERE)

12-8dbf-4cf4-b312-c544e73bb7b3 12-8dbf-4cf4-b312-c544e73bb7b3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Metered 250W HPS Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

402

Data:B4e9e353-2767-4876-b0e8-7b096c31b4f7 | Open Energy Information  

Open Energy Info (EERE)

e9e353-2767-4876-b0e8-7b096c31b4f7 e9e353-2767-4876-b0e8-7b096c31b4f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Residential Electric Service Sector: Residential Description: Available for all domestic purposes in individually metered dwelling units and in duplexes and triplexes, including the separately metered domestic facilities of a residential Customer (e.g., detached garage) and including rural domestic Customers engaged principally in agricultural pursuits. See definition of "Domestic Service.

403

Data:A2ecd834-27b9-42d5-8d94-7b5e7176467d | Open Energy Information  

Open Energy Info (EERE)

ecd834-27b9-42d5-8d94-7b5e7176467d ecd834-27b9-42d5-8d94-7b5e7176467d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (1000W MV-Open/Closed) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

404

Data:47fc8d22-c7b4-424d-9461-05ebc93be294 | Open Energy Information  

Open Energy Info (EERE)

fc8d22-c7b4-424d-9461-05ebc93be294 fc8d22-c7b4-424d-9461-05ebc93be294 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2007/07/01 End date if known: Rate name: STREET LIGHTING SERVICE 150 Watt High Pressure Sodium Lamp Sector: Lighting Description: 16,000 Lumen High Pressure Sodium Lamp. Source or reference: http://www.pemc.coop/rateSchedules.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

405

Data:92ab1ed7-b7bf-4f7f-a7f1-8c67c65258bb | Open Energy Information  

Open Energy Info (EERE)

ed7-b7bf-4f7f-a7f1-8c67c65258bb ed7-b7bf-4f7f-a7f1-8c67c65258bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Street Lighting Service- 250W HPS Underground Aluminum Sector: Lighting Description: Available for lighting streets and roadways, whether public or private, which are thoroughfares for normal flow of vehicular traffic. This rate is generally available to governmental agencies. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181 Source Parent: Comments Applicability

406

Data:68c5e48a-edb1-40c9-8a7b-9ca5306893a5 | Open Energy Information  

Open Energy Info (EERE)

e48a-edb1-40c9-8a7b-9ca5306893a5 e48a-edb1-40c9-8a7b-9ca5306893a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Sodium Vapor Units 70 Watt Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

407

Data:C2016a08-c44b-4835-aeee-f7b01a1c98ec | Open Energy Information  

Open Energy Info (EERE)

a08-c44b-4835-aeee-f7b01a1c98ec a08-c44b-4835-aeee-f7b01a1c98ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 150 TRENTON TYPE III Sector: Commercial Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

408

Data:F4f7a625-a66b-448e-a505-7b1187920106 | Open Energy Information  

Open Energy Info (EERE)

a625-a66b-448e-a505-7b1187920106 a625-a66b-448e-a505-7b1187920106 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

409

Data:3c30053a-7b14-4dfd-8598-4d6ecb362bd0 | Open Energy Information  

Open Energy Info (EERE)

a-7b14-4dfd-8598-4d6ecb362bd0 a-7b14-4dfd-8598-4d6ecb362bd0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bristol Virginia Utilities Effective date: 2011/10/01 End date if known: Rate name: Manufacturing Service Rate - Schedule MSB(>5,000 kW and <15,000 kW) Sector: Industrial Description: Facility Charge - Delivery Voltage Level First 10,000 kW: 161kV = 0.00 per kW. Over 10,000 kW: 161kV = 0.00 per kW. Source or reference: http://www.bvu-optinet.com/data_elements/Electric_Rates.pdf

410

Data:6ff666ff-7b31-4f6b-8c62-faddf350c6dd | Open Energy Information  

Open Energy Info (EERE)

ff-7b31-4f6b-8c62-faddf350c6dd ff-7b31-4f6b-8c62-faddf350c6dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (250 MH Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

411

Data:47ac97ba-36a4-4213-b938-7b554a6a8fb2 | Open Energy Information  

Open Energy Info (EERE)

7ba-36a4-4213-b938-7b554a6a8fb2 7ba-36a4-4213-b938-7b554a6a8fb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Inter County Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 50,000 Lumen - Directional Floodlight Sector: Lighting Description: per lamp per month Source or reference: http://www.intercountyenergy.net/content/energy-rates-net-metering Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

412

Data:Cb06dd46-7b3c-4605-9f2b-271539977db0 | Open Energy Information  

Open Energy Info (EERE)

6dd46-7b3c-4605-9f2b-271539977db0 6dd46-7b3c-4605-9f2b-271539977db0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Blue Earth, Minnesota (Utility Company) Effective date: End date if known: Rate name: Industrial Electric Sector: Industrial Description: Source or reference: http://www.belw.org/Rate Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

413

Data:E7f51c50-51b1-4244-b052-7b52306c755a | Open Energy Information  

Open Energy Info (EERE)

f51c50-51b1-4244-b052-7b52306c755a f51c50-51b1-4244-b052-7b52306c755a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Optional High Load Factor Service- Demand Metered Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

414

Data:757b78c3-7b01-44f3-8e27-bba47b686673 | Open Energy Information  

Open Energy Info (EERE)

8c3-7b01-44f3-8e27-bba47b686673 8c3-7b01-44f3-8e27-bba47b686673 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2011/07/08 End date if known: Rate name: OUTDOOR LIGHTING "OL" High Pressure Sodium 70W Sector: Lighting Description: there are many different classifications for different structures for lights. The monthly charge here is for the existing pole. Click on the link for other structures. Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

415

Data:0262df45-995c-4482-a49f-7b06d8c26253 | Open Energy Information  

Open Energy Info (EERE)

df45-995c-4482-a49f-7b06d8c26253 df45-995c-4482-a49f-7b06d8c26253 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Greendale, Indiana (Utility Company) Effective date: End date if known: Rate name: Security light service - 250 Watt Sodium Sector: Lighting Description: Source or reference: http://cityofgreendale.net Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

416

Data:A8588cb7-b648-4161-9b6d-171dc14500be | Open Energy Information  

Open Energy Info (EERE)

cb7-b648-4161-9b6d-171dc14500be cb7-b648-4161-9b6d-171dc14500be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: MUNICIPAL WATER PUMPING - RATE CLASS 44 Sector: Commercial Description: Source or reference: http://www.custerpower.com/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

417

Data:0115b145-e9cb-4de7-b2a4-a3fb994175e8 | Open Energy Information  

Open Energy Info (EERE)

b145-e9cb-4de7-b2a4-a3fb994175e8 b145-e9cb-4de7-b2a4-a3fb994175e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/02 End date if known: Rate name: Schedule 02L - Commercial Large Sector: Commercial Description: Available for commercial and industrial consumers, where the required transformer capacity does not exceed 75 KVA and where the starting current of the largest motor does not exceed 260 amperes for all uses, and subject to the rules, regulations and rates as established or as may from time to time be adopted by the Seller. Source or reference: www.cceci.com

418

Data:9590f1f3-b174-4211-b576-833affd7b92a | Open Energy Information  

Open Energy Info (EERE)

f3-b174-4211-b576-833affd7b92a f3-b174-4211-b576-833affd7b92a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc (Utah) Effective date: 2000/07/01 End date if known: Rate name: Street Lighting-High Pressure Sodium-CONSUMER-OWNED SYSTEM 250W Sector: Lighting Description: All standards, brackets, foundations, lighting units and glassware shall be at the expense of the city or property owner. Maintenance, lamp and glass renewals shall be negotiated with the Association. Source or reference: http://www.mleainc.com/pdf/rates/rate_sch_sl.pdf Source Parent: Comments Applicability

419

Data:9fd9bf3b-51c5-42cb-afc1-7b160f91a30c | Open Energy Information  

Open Energy Info (EERE)

bf3b-51c5-42cb-afc1-7b160f91a30c bf3b-51c5-42cb-afc1-7b160f91a30c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Residential Service Sector: Residential Description: Available to all residential consumers and individually metered apartments who require less than 50 kVA transformer capacity within the Utility's service area and who maintain residence in the same premise for nine months or more per year. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW):

420

Data:4e6c54d3-26a6-4919-8400-7d7b12e79780 | Open Energy Information  

Open Energy Info (EERE)

d3-26a6-4919-8400-7d7b12e79780 d3-26a6-4919-8400-7d7b12e79780 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate S1- Security Lights- (175W MH) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:027b2be4-12f8-49f5-bd7b-10b2aa57bdaa | Open Energy Information  

Open Energy Info (EERE)

be4-12f8-49f5-bd7b-10b2aa57bdaa be4-12f8-49f5-bd7b-10b2aa57bdaa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Elec Member Corp Effective date: End date if known: Rate name: 250 Watt HPS Sector: Lighting Description: Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=129296 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

422

Data:7712ec91-bf78-46f7-b865-4d9b14fd5d20 | Open Energy Information  

Open Energy Info (EERE)

1-bf78-46f7-b865-4d9b14fd5d20 1-bf78-46f7-b865-4d9b14fd5d20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bellevue, Iowa (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Residential Electric Sector: Residential Description: Source or reference: Rate Binder# 1B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

423

Data:9e36c369-f7b9-499f-b282-635b7cc716e1 | Open Energy Information  

Open Energy Info (EERE)

9-f7b9-499f-b282-635b7cc716e1 9-f7b9-499f-b282-635b7cc716e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 150 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

424

Data:3c799715-c6d4-483a-9c22-7b3da6aac5f0 | Open Energy Information  

Open Energy Info (EERE)

-c6d4-483a-9c22-7b3da6aac5f0 -c6d4-483a-9c22-7b3da6aac5f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2012/06/01 End date if known: Rate name: GENERAL SERVICE - TRANSMISSION "GS-T" Sector: Commercial Description: Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

425

Data:89b4def7-28a1-4176-b7b3-fcd913a7a847 | Open Energy Information  

Open Energy Info (EERE)

def7-28a1-4176-b7b3-fcd913a7a847 def7-28a1-4176-b7b3-fcd913a7a847 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: Commercial General Service Demand Three-Phase Primary Voltage Sector: Commercial Description: *Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD). Available to industrial and commercial customers with peak demands of 100 kW or more in any two summer months or 200 kW or more in any two months of a 12 consecutive month period.

426

Data:69d0b82c-6f7b-479c-be5f-69b8ae37de3b | Open Energy Information  

Open Energy Info (EERE)

c-6f7b-479c-be5f-69b8ae37de3b c-6f7b-479c-be5f-69b8ae37de3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation CYC 1 - Sunday Only - Three Phase Sector: Industrial Description: Source or reference: Illinois State University binder #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

427

Data:7182c755-581f-40f9-a911-4f54c6b55a7b | Open Energy Information  

Open Energy Info (EERE)

55-581f-40f9-a911-4f54c6b55a7b 55-581f-40f9-a911-4f54c6b55a7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 250 HPS Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

428

Data:1bbd8a76-23b0-4c7b-8aa1-7591808ba570 | Open Energy Information  

Open Energy Info (EERE)

bbd8a76-23b0-4c7b-8aa1-7591808ba570 bbd8a76-23b0-4c7b-8aa1-7591808ba570 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Greenfield, Indiana (Utility Company) Effective date: End date if known: Rate name: GENERAL SERVICE (GS), Single-Phase Sector: Commercial Description: If the electric utility places its meters at the primary voltage level, the consumer's demand (kW) and energy (kWh) measurements shall be reduced by 2% for the purposes of this schedule. Source or reference: http://www.greenfieldin.org/utility-billing Source Parent: http://www.greenfieldin.org/utilities/utility-billing-department

429

Data:4ad218f4-09d6-44d7-b8b9-1530129c3528 | Open Energy Information  

Open Energy Info (EERE)

8f4-09d6-44d7-b8b9-1530129c3528 8f4-09d6-44d7-b8b9-1530129c3528 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2011/10/01 End date if known: Rate name: Schedule 81 - South System General Power Time-of-Use Rate Sector: Commercial Description: This rate shall apply to the firm power requirements for electric service to commercial, industrial, and governmental customers, and institutional customers whose monthly read demand is greater than 0 and less than or equal to 50 KW. Source or reference: ISU Documentation Source Parent: Comments Applicability

430

Data:B3aa98b6-df24-4802-ac4c-4effd2f58a7b | Open Energy Information  

Open Energy Info (EERE)

b6-df24-4802-ac4c-4effd2f58a7b b6-df24-4802-ac4c-4effd2f58a7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns Coop Repairs HPS 250 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

431

Data:43fe7fae-7b0e-49d8-a65b-33e4c0bf25ed | Open Energy Information  

Open Energy Info (EERE)

fae-7b0e-49d8-a65b-33e4c0bf25ed fae-7b0e-49d8-a65b-33e4c0bf25ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Brodhead Water & Lighting Comm Effective date: 2010/02/15 End date if known: Rate name: General Service - GS-1 - Single Phase Sector: Commercial Description: *POWER COST ADJUSTMENT CLAUSE (PCAC): All metered rates are subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt - hour of sales) is greater or lesser than the base cost of power purchased and produced (per kilowatt - hour of sales).

432

Data:91ed16b7-e22c-4c3b-8622-c5aa7b095c7c | Open Energy Information  

Open Energy Info (EERE)

ed16b7-e22c-4c3b-8622-c5aa7b095c7c ed16b7-e22c-4c3b-8622-c5aa7b095c7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 45: Irrigation >60 Horsepower - Multi-Phase Sector: Commercial Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To uses of electrical power on a continuous basis for seasonal agricultural irrigation pumping or agricultural drainage pumping. C. Character of Service: Sixty-hertz (60) alternating current of such phase and voltage as the electric utility may have available.

433

Data:2984a470-ad02-4613-b9d8-fdf360d08b7b | Open Energy Information  

Open Energy Info (EERE)

a470-ad02-4613-b9d8-fdf360d08b7b a470-ad02-4613-b9d8-fdf360d08b7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2012/06/01 End date if known: Rate name: Private Outdoor Security (Closed Rate) - 175 W MV - Wood Pole Sector: Lighting Description: Source or reference: http://www.provo.org/util.rates_summary.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

434

Data:8f843ec1-199f-42cd-9a5c-bc7b2a941dc3 | Open Energy Information  

Open Energy Info (EERE)

ec1-199f-42cd-9a5c-bc7b2a941dc3 ec1-199f-42cd-9a5c-bc7b2a941dc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Missoula Electric Coop, Inc (Montana) Effective date: 2010/10/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.missoulaelectric.com/Member_Care/Rate_Schedule Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

435

Data:F895cd7b-6366-475d-b3ea-7c8ee28c331f | Open Energy Information  

Open Energy Info (EERE)

cd7b-6366-475d-b3ea-7c8ee28c331f cd7b-6366-475d-b3ea-7c8ee28c331f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Available to consumers in excess of 100 kVa. Not available for standby power. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

436

Data:21be87c5-7b25-4700-b7d9-ea41353754c3 | Open Energy Information  

Open Energy Info (EERE)

7b25-4700-b7d9-ea41353754c3 7b25-4700-b7d9-ea41353754c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Residential rate-all electric-rate #10 (Three Phase) Tiered Sector: Residential Description: Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

437

Data:3d5f86a6-d314-46dc-823f-342f15eb7b40 | Open Energy Information  

Open Energy Info (EERE)

a6-d314-46dc-823f-342f15eb7b40 a6-d314-46dc-823f-342f15eb7b40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/05/01 End date if known: 2013/09/30 Rate name: Seasonal Unmetered Service Sector: Commercial Description: Applicable to where customers desire an electric service connection for a very limited time requirement, such as, but not limited to carnivals, the circus, shows, etc, and metering is not feasible. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

438

Data:0ee8816e-6ed0-4aec-9423-7b45b8bb04d4 | Open Energy Information  

Open Energy Info (EERE)

e-6ed0-4aec-9423-7b45b8bb04d4 e-6ed0-4aec-9423-7b45b8bb04d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 140W LED Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

439

Data:F7c1cb6e-6bd6-4238-a8c6-cd7b850354e6 | Open Energy Information  

Open Energy Info (EERE)

cb6e-6bd6-4238-a8c6-cd7b850354e6 cb6e-6bd6-4238-a8c6-cd7b850354e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Street Lighting: Ornamental Service Overhead 250 Watt HPS Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

440

Data:E6ea278e-119b-4b7b-9213-1254a0ff95aa | Open Energy Information  

Open Energy Info (EERE)

8e-119b-4b7b-9213-1254a0ff95aa 8e-119b-4b7b-9213-1254a0ff95aa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: General Three Phase Sector: Commercial Description: Source or reference: http://www.shawano.tv/id75.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:D9bd462e-d822-4658-8142-a1aeabc8b7b6 | Open Energy Information  

Open Energy Info (EERE)

62e-d822-4658-8142-a1aeabc8b7b6 62e-d822-4658-8142-a1aeabc8b7b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Denton County Elec Coop, Inc Effective date: 2012/06/21 End date if known: Rate name: Public Building Rate (1) Sector: Residential Description: Applicable to public buildings (including schools, churches and community halls, but not municipal facilities) with a demand requirement less than 35 kW Source or reference: http://www.coserv.com/Electric/CustomerService/CurrentRatesandTariff/PublicBuildings/tabid/204/Default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW):

442

Data:74113c77-acd7-4b36-8124-7b0de63eb5b0 | Open Energy Information  

Open Energy Info (EERE)

13c77-acd7-4b36-8124-7b0de63eb5b0 13c77-acd7-4b36-8124-7b0de63eb5b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: End date if known: Rate name: Load Profile/Real Time Metering Service Rate "LPRT" Sector: Description: This rate is available to any Coldwater Board of Public Utilities electric customer. Service is subject to any restrictions and proper execution of contract. This service gives the customer access to 15-minute demand load profile meter information and/or real time energy information via the Internet. Load Profile Service Connected via CBPU Telecommunications System $35.00

443

Data:391a92fd-5d7b-4c16-8fb7-fdb3000d84a5 | Open Energy Information  

Open Energy Info (EERE)

fd-5d7b-4c16-8fb7-fdb3000d84a5 fd-5d7b-4c16-8fb7-fdb3000d84a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Public Street and Highway Lighting Service- Cooperative Owned Decorative Fixture (150W HPS) Sector: Lighting Description: Applicable to customers, under the qualification Street Light Districts and governmental agencies for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18

444

Data:7e10ef34-7fd5-488d-8692-5ce3f7b52cf9 | Open Energy Information  

Open Energy Info (EERE)

7fd5-488d-8692-5ce3f7b52cf9 7fd5-488d-8692-5ce3f7b52cf9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lenoir, Tennessee (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.lcub.com/electric/SitePages/erates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

445

Data:E3840fa3-77a1-4616-ac5b-7b7f6b0c9fbf | Open Energy Information  

Open Energy Info (EERE)

fa3-77a1-4616-ac5b-7b7f6b0c9fbf fa3-77a1-4616-ac5b-7b7f6b0c9fbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Outdoor Lighting Rate--Schedule LS High Pressure Sodium (1000w) Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations, and outdoor lighting for individual customers. Service under this schedule is for a term of not less than 1 year. Source or reference: http://www.jwemc.org/rateforms.aspx Source Parent:

446

Data:Df00fc3b-11ff-4e3b-9578-7b7cf7c83694 | Open Energy Information  

Open Energy Info (EERE)

11ff-4e3b-9578-7b7cf7c83694 11ff-4e3b-9578-7b7cf7c83694 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Utility Type Fixtures HPS 1000 W Sector: Lighting Description: *Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

447

Data:91841210-df30-4f2e-8a7b-6afa5945d396 | Open Energy Information  

Open Energy Info (EERE)

10-df30-4f2e-8a7b-6afa5945d396 10-df30-4f2e-8a7b-6afa5945d396 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Klickitat County Effective date: 2013/04/01 End date if known: Rate name: PUD Electrical Service Sch 8 Sector: Commercial Description: Available to PUD accounts required to maintain electrical service (warehouses, offices, etc.) Source or reference: http://www.klickitatpud.com/ratesAndPolicies/electricRates/rateSchedule8.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

448

Data:Ca600802-b9c6-4a52-82ba-037fd0673e7b | Open Energy Information  

Open Energy Info (EERE)

2-b9c6-4a52-82ba-037fd0673e7b 2-b9c6-4a52-82ba-037fd0673e7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2011/07/01 End date if known: Rate name: SCHEDULE ALQ PRIVATE OUTDOOR AREA LIGHTING SERVICE Mercury 175 Watt - Customer-Owned Sector: Lighting Description: AVAILABILITY Service under this Rate Schedule is available only for installations served on this Rate Schedule prior to December 13; 1985.The rating of lamps in lumens is for identification and shall approximate the manufacturer's standard rating. Available to all Member/Consumers of this class within the new service territory acquired from Potomac Edison Company

449

Data:Cce17d4f-997c-4c75-945f-7b671a130bbb | Open Energy Information  

Open Energy Info (EERE)

Cce17d4f-997c-4c75-945f-7b671a130bbb Cce17d4f-997c-4c75-945f-7b671a130bbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Commercial Service-Single Phase, Schedule C-1 Sector: Commercial Description: Business, industrial and non-residential service such as schools, rural water districts, churches and public buildings, for all uses subject to the established rules and regulations of the Cooperative. Not available for irrigation uses. Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

450

Data:Bd696d0a-7fd9-4017-aad7-b3dcb43a373e | Open Energy Information  

Open Energy Info (EERE)

d0a-7fd9-4017-aad7-b3dcb43a373e d0a-7fd9-4017-aad7-b3dcb43a373e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (175 MV Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

451

Data:3ae5bd61-4040-44d4-87fb-e7b920e86229 | Open Energy Information  

Open Energy Info (EERE)

1-4040-44d4-87fb-e7b920e86229 1-4040-44d4-87fb-e7b920e86229 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Large Industrial Secondary (KW23) Sector: Industrial Description: Large commercial secondary voltage rate for large commercial and industrial customers with monthly demand usage exceeding 50 KWD. Source or reference: http://publicutilities.columbus.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=45273 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

452

Data:41a9d455-7b37-45ae-9ed3-e0cabce462bd | Open Energy Information  

Open Energy Info (EERE)

d455-7b37-45ae-9ed3-e0cabce462bd d455-7b37-45ae-9ed3-e0cabce462bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central New Mexico El Coop, Inc Effective date: End date if known: Rate name: Time of Use Commercial Service (rate 30 OFF) Sector: Commercial Description: Any commercial consumers without and ETS unit wishing to abide by the on peak off peak hours are eligible. Source or reference: http://cnmec.org/index.php?page=electric-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

453

Data:Caa9890f-ae49-4232-8a7b-b5d06946846f | Open Energy Information  

Open Energy Info (EERE)

Caa9890f-ae49-4232-8a7b-b5d06946846f Caa9890f-ae49-4232-8a7b-b5d06946846f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Inter County Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 7000 Lumen - Security Light Sector: Lighting Description: per lamp per month Source or reference: http://www.intercountyenergy.net/content/energy-rates-net-metering Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

454

Data:D6e8275d-e0d2-42ac-bd53-7b436f681eff | Open Energy Information  

Open Energy Info (EERE)

e0d2-42ac-bd53-7b436f681eff e0d2-42ac-bd53-7b436f681eff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: GS-TOU3 (GUS_S) Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments FRA= Solar Surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

455

Data:034b3225-6278-4f04-ac81-f1eac8e7b82e | Open Energy Information  

Open Energy Info (EERE)

225-6278-4f04-ac81-f1eac8e7b82e 225-6278-4f04-ac81-f1eac8e7b82e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NorthWestern Energy Effective date: 2009/06/01 End date if known: Rate name: Rate 25 All-Inclusive Commercial Service Sector: Commercial Description: *This rate schedule is available to commercial customers for all use through one meter provided that the use includes any or all of the following services: (1) space heating, (2) cooking, (3) water heating(excluding tankless water heaters), and provided further that any one or all of the above uses represents the major portion of the connected load and annual consumption.

456

Data:42cdf5d9-7b20-4e16-857b-90c5a46fcac2 | Open Energy Information  

Open Energy Info (EERE)

7b20-4e16-857b-90c5a46fcac2 7b20-4e16-857b-90c5a46fcac2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 150 W HPS, Metered Sector: Lighting Description: * Applicable to customers who receive dusk to dawn area lighting service. Rate when light is metered through customer service. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

457

Data:Cb916013-2959-4e37-a6d7-29f3034ac7b8 | Open Energy Information  

Open Energy Info (EERE)

16013-2959-4e37-a6d7-29f3034ac7b8 16013-2959-4e37-a6d7-29f3034ac7b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Edgecombe-Martin County E M C Effective date: 2006/08/01 End date if known: Rate name: RESIDENTIAL SERVICE Postpaid Account Sector: Lighting Description: AVAILABILITY: Electric service is available under this Schedule for residential use and incidental farm and other use supplied through one meter to each resident, farm building, or apartment unit. Service under this Schedule is not available for commercial or other business establishments, institutions, and farm or residential uses with individual motors in excess of 10 horsepower.

458

Data:0429e19a-3e6e-49a0-a881-d6ad7b435efb | Open Energy Information  

Open Energy Info (EERE)

e6e-49a0-a881-d6ad7b435efb e6e-49a0-a881-d6ad7b435efb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: Rate name: Maui-SCHEDULE F PUBLIC STREET LIGHTING-250/400 Watt Mercury Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Maui where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge+$25.00 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/MauiRatesSchF.pdf

459

Data:82c1e6db-4473-4da7-b1ac-2bea65060d9a | Open Energy Information  

Open Energy Info (EERE)

4473-4da7-b1ac-2bea65060d9a 4473-4da7-b1ac-2bea65060d9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Residential Rate #1 (Single Phase) Composite rate Sector: Residential Description: there is a composite rate and a tiered rate. Source or reference: see IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

460

Data:153b2dd8-2926-4a97-9fa7-b37603e19ab5 | Open Energy Information  

Open Energy Info (EERE)

dd8-2926-4a97-9fa7-b37603e19ab5 dd8-2926-4a97-9fa7-b37603e19ab5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2008/01/01 End date if known: Rate name: Renewable Energy Rider Sector: Description: Service under this rider is available to all customers currently served under Rate Schedules Rg-1, Rg-2, Gs-1, Cp-1, Cp-2, Cp-3, Ms-1, and Ms-2. This rider allow the customers the option of purchasing blocks of their energy from renewable sources. Block charge for renewable energy = $3.00 per 300kWh block of renewable energy per month.

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Data:0d4eae9b-75e4-4ec5-b169-69e550a27e7b | Open Energy Information  

Open Energy Info (EERE)

eae9b-75e4-4ec5-b169-69e550a27e7b eae9b-75e4-4ec5-b169-69e550a27e7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (250W MV-Open/Closed) - Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent:

462

Data:F0dffada-9bd4-4687-a811-bfe758d7b9ae | Open Energy Information  

Open Energy Info (EERE)

dffada-9bd4-4687-a811-bfe758d7b9ae dffada-9bd4-4687-a811-bfe758d7b9ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2005/09/28 End date if known: Rate name: 2 High load factor service (HLFS - TOD) - (primary voltage) Sector: Industrial Description: This rate is applicable on a voluntary basis under the regular terms and conditions of the company to customers who contract for not less then 2500 kW of electric service at company's available line voltage. Source or reference: www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_lps-tod.pdf

463

Data:Eb91fbca-b665-4a3b-8c7b-218982b771a0 | Open Energy Information  

Open Energy Info (EERE)

Eb91fbca-b665-4a3b-8c7b-218982b771a0 Eb91fbca-b665-4a3b-8c7b-218982b771a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 100 watt Incandescent Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

464

Data:9d5d4f98-a7b3-4efb-9444-f86e08d70279 | Open Energy Information  

Open Energy Info (EERE)

8-a7b3-4efb-9444-f86e08d70279 8-a7b3-4efb-9444-f86e08d70279 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/01/01 End date if known: Rate name: Rental Light Service- Roadway Luminaires- (400 W MV without Pole) Sector: Lighting Description: Applicable only to outdoor lighting by ballast operated vapor lamp fixtures, either Mercury Vapor, Pressure Sodium, or Metal Halide. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

465

International Energy Outlook - Special Topics  

Gasoline and Diesel Fuel Update (EIA)

A A Energy Information Administration Forecast Channel. If having trouble viewing this page, contact the National Energy Informaiton Center at (202) 586-8800. Return to Energy Information Administration Home Page Home > Environment> International Energy Outlook> Special Topics International Energy Outlook 2004 Converting Gross Domestic Product for Different Countries to U.S. Dollars: Market Exchange Rates and Purchasing Power Parity Rates The world energy forecasts in IEO2004 are based primarily on projections of GDP for different countries and regions, which for purposes of comparison are expressed in 1997 U.S. dollars. First, GDP projections are prepared for the individual countries in terms of their own national currencies and 1997 prices of goods and services. Then, the projections are converted to 1997 U.S. dollars by applying average 1997 foreign exchange rates between the various national currencies and the dollar. The resulting projections of real GDP are thus based on national 1997 prices in each country and the 1997 market exchange rate (MER) for each currency against the U.S. dollar.

466

Property:DIA/Topic | Open Energy Information  

Open Energy Info (EERE)

Topic Topic Jump to: navigation, search Property Name DIA/Topics Property Type String Description Development Impacts Assessment Toolkit property to help filter pages Used in Form/Template Tool Allows Values Environmental;Economic;Social Pages using the property "DIA/Topic" Showing 7 pages using this property. A Alternative Fuel and Advanced Technology Vehicles Pilot Program Emissions Benefit Tool + Environmental + Applied Dynamic Analysis of the Global Economy (ADAGE) Model + Environmental +, Economic + E Electricity Markets Analysis (EMA) Model + Environmental +, Economic +, Social + Energy Forecasting Framework and Emissions Consensus Tool (EFFECT) + Environmental + P Powering Health + Social + T Threshold 21 Model + Social + U UNEP-Bioenergy Decision Support Tool + Environmental +, Economic +, Social +

467

Small Business Funding Opportunity Topics Released | Department...  

Energy Savers [EERE]

Office of Energy Efficiency and Renewable Energy (EERE) today announced nine topics and 26 new subtopics under its Small Business Innovation Research (SBIR) and Technology...

468

E-Print Network Topics: F  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

investigations formation nw jordan formation ofextrachromosomal dnas formation oil shale formation oil shales formation ombilin basin formation options topical formation ordos...

469

Events & Topics Tours | Photosynthetic Antenna Research Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Climate Technologies campus, to be followed by a brief presentation. Topics will include home automation, the internet of things, wireless sensor networks, and other smart...

470

Data:2a191ee7-3349-4b9e-bcf3-eaac7b2da244 | Open Energy Information  

Open Energy Info (EERE)

2a191ee7-3349-4b9e-bcf3-eaac7b2da244 2a191ee7-3349-4b9e-bcf3-eaac7b2da244 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Lansdale, Pennsylvania (Utility Company) Effective date: 2013/01/16 End date if known: Rate name: High-Tension Service Rate Sector: Industrial Description: The fixed monthly charge is the combined monthly customer charge ($100) and the monthly minimum demand charge ($12,870). Source or reference: http://www.lansdale.org/vertical/Sites/%7B862B0D24-07B5-47AF-8DA9-6A7934A26ACB%7D/uploads/Motion_F_Res._13-02_revise_electric_rates_fees_etc._1.16.13.pdf Source Parent: http://www.lansdale.org

471

Advanced Topics in Types and Programming Languages  

E-Print Network [OSTI]

Advanced Topics in Types and Programming Languages Benjamin C. Pierce, editor The MIT Press Advanced Topics in Types and programming languages / Benjamin C. Pierce, editor p. cm. Includes bibliographical references and index. ISBN 0-262-16228-8 (hc.: alk. paper) 1. Programming languages (Electronic

Pitts, Andrew

472

TOPICS IN CLIMATE RESEARCH Course Description  

E-Print Network [OSTI]

Projects 6 Climate Theory; Climate Forcing; Climate Feedbacks I 4 7 Climate Theory; Climate ForcingTOPICS IN CLIMATE RESEARCH AT 755 Course Description: This course is a survey of current topics in climate research, including the decadal to paleoclimate observational record, the impacts of climate

473

TASK PLAN: Tribal Issues Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Page 1 Status: Active DOE Lead: National Transportation Program (NTP-AL; Judith Holm @ 505-845-4767) Start Date: January 1998 End Date: TBD Subject: TEC Topic Group - Tribal Issues rpose: To address issues such as: (1) HM-164 as it relates to Tribes; (2) to complete the Tribal column of the Rail Topic Group Regulatory Matrix; (3) to determine Tribal authority to stop and inspect shipments of radioactive materials; (4) to provide tribal pre-notification of DOE spent fuel shipments consistent with DOE policy and to provide continuous satellite-based tracking and monitoring capability to Tribes; (5) and to address Tribal involvement in transportation planning, training, and funding. The Topic Group

474

DOE Simulator Training to Brazil's Petrobas Advances Goal of Deploying  

Broader source: Energy.gov (indexed) [DOE]

DOE Simulator Training to Brazil's Petrobas Advances Goal of DOE Simulator Training to Brazil's Petrobas Advances Goal of Deploying Clean Coal Technology at Home and Abroad DOE Simulator Training to Brazil's Petrobas Advances Goal of Deploying Clean Coal Technology at Home and Abroad September 25, 2012 - 1:00pm Addthis Washington, DC - A recently-completed comprehensive Department of Energy (DOE) training initiative using an innovative high-fidelity combined-cycle dynamic simulator has provided employees of a Brazilian multi-national company the opportunity to learn to operate and control the near-zero-emission power plants critical to a cleaner energy future. The 8-day course for power plant operators from Petrobras used a simulator from the National Energy Technology Laboratory (NETL)-sponsored AVESTAR™ (Advanced Virtual Energy Simulation Training and Research) Center.

475

Technology Development, Growth, and Deployment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technology Development, Technology Development, Growth, and Deployment Technology Development, Growth, and Deployment A look at our resources: This map shows the location of our National Laboratories with links to their Technology Transfer programs; the locations of our i6 Green Challenge grant recipients; and the nation's Minority Serving Institutions. Our office works to engage the research and innovation at Minority Serving Institutions with the resources of our National Labs. Early stage energy technologies face a number of challenges in transitioning for basic research to market solutions. The Energy Department has created specific initiatives in order to address the commercialization challenges that energy efficient and renewable energy technologies must face. These initiatives are developed to launch emerging

476

ARM - Publications: Science Team Meeting Documents: Testing and Deployment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing and Deployment of an Infrared Thermometer Network at the ARM Testing and Deployment of an Infrared Thermometer Network at the ARM Southern Great Plains Climate Research Facility Morris, Victor Pacific Northwest National Laboratory Long, Chuck Pacific Northwest National Laboratory To increase our ability to calculate heating rate profiles to study the variability across the Global Climate Model scale area and for inferring information about distribution and character of cloudiness across the Southern Great Plains (SGP) domain, downwelling Infrared Thermometers (IRT) will be installed at the SGP Extended Facilities (EF). Initially, IRTs will be installed at five of the twenty-one EFs and one at the Central Facility (CF). The sky brightness temperature measurements will be sampled at a rate of 5 Hz to capture the inherent variability under cloudy and partly cloudy

477

Community Renewable Energy Deployment: Haxtun Wind Project | Open Energy  

Open Energy Info (EERE)

Haxtun Wind Project Haxtun Wind Project Jump to: navigation, search Name Community Renewable Energy Deployment: Haxtun Wind Project Agency/Company /Organization US Department of Energy Focus Area Economic Development, Renewable Energy, Wind Phase Evaluate Options, Get Feedback, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly Available--Free Publication Date 2/7/2011 Website http://www1.eere.energy.gov/co Locality Phillips County, Colorado References Community Renewable Energy Deployment: Haxtun Wind Project[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 Related Tools 5 References Overview This short case study describes Phillips County's Haxtun Wind Project efforts through the Department of Energy's Community Renewable Energy

478

Clean coal technology deployment: From today into the next millennium  

SciTech Connect (OSTI)

The Department of Energy`s clean coal technology (CCT) program succeeded in developing more efficient, cleaner, coal-fired electricity options. The Department and its private partners succeeded in the demonstration of CCT -- a major feat that required more than a decade of commitment between them. As with many large-scale capital developments and changes, the market can shift dramatically over the course of the development process. The CCT program was undertaken in an era of unstable oil and gas prices, concern over acid rain, and guaranteed markets for power suppliers. Regulations, fuel prices, emergency of competing technologies, and institutional factors are all affecting the outlook for CCT deployment. The authors identify the major barriers to CCT deployment and then introduce some possible means to surmount the barriers.

Papay, L.T.; Trocki, L.K.; McKinsey, R.R. [Bechtel Technology and Consulting, San Francisco, CA (United States)

1997-12-31T23:59:59.000Z

479

DOE Report Describes Progress in the Deployment of Synchrophasor  

Open Energy Info (EERE)

DOE Report Describes Progress in the Deployment of Synchrophasor DOE Report Describes Progress in the Deployment of Synchrophasor Technologies for Improved Grid Operations Home > Blogs > Graham7781's blog Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 August, 2013 - 09:09 OpenEI PMU recovery act SGIG Smart Grid The U.S. Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) is pleased to announce the publication of a new report from the Smart Grid Investment Grant (SGIG) and Smart Grid Demonstration programs (SGDP), which are grid modernization activities funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). Twelve projects are installing synchrophasor technologies and systems across the country and beginning to use various on-line and off-line

480

Community Renewable Energy Deployment: University of California at at Davis  

Open Energy Info (EERE)

at at Davis at at Davis Project Jump to: navigation, search Name Community Renewable Energy Deployment: University of California at at Davis Project Agency/Company /Organization US Department of Energy Focus Area Energy Efficiency, Greenhouse Gas, Grid Assessment and Integration, Other, Renewable Energy, Biomass - Anaerobic Digestion, Solar - Concentrating Solar Power, Hydrogen and Fuel Cells, - Solar Pv, Biomass - Waste To Energy Phase Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly available--Free Publication Date 2/2/2011 Website http://www1.eere.energy.gov/co Locality University of California at Davis References Community Renewable Energy Deployment: University of California at at Davis Project[1] Contents

Note: This page contains sample records for the topic "deployment topic 7b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Implementing Geological Disposal of Radioactive Waste Technology Platform From the Strategic Research Agenda to its Deployment - 12015  

SciTech Connect (OSTI)

Several European waste management organizations (WMOs) have initiated a technology platform for accelerating the implementation of deep geological disposal of radioactive waste in Europe. The most advanced waste management programmes in Europe (i.e. Finland, Sweden, and France) have already started or are prepared to start the licensing process of deep geological disposal facilities within the next decade. A technology platform called Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP) was launched in November 2009. A shared vision report for the platform was published stating that: 'Our vision is that by 2025, the first geological disposal facilities for spent fuel, high-level waste, and other long-lived radioactive waste will be operating safely in Europe'. In 2011, the IGD-TP had eleven WMO members and about 70 participants from academia, research, and the industry committed to its vision. The IGD-TP has started to become a tool for reducing overlapping work, to produce savings in total costs of research and implementation and to make better use of existing competence and research infrastructures. The main contributor to this is the deployment of the IGD-TP's newly published Strategic Research Agenda (SRA). The work undertaken for the SRA defined the pending research, development and demonstration (RD and D) issues and needs. The SRA document describing the identified issues that could be worked on collaboratively was published in July 2011. It is available on the project's public web site (www.igdtp.eu). The SRA was organized around 7 Key Topics covering the Safety Case, Waste forms and their behaviour, Technical feasibility and long-term performance of repository components, Development strategy of the repository, Safety of construction and operations, Monitoring, and Governance and stakeholder involvement. Individual Topics were prioritized within the Key Topics. Cross-cutting activities like Education and Training or Knowledge Management as well as activities remaining specific for the WMOs were as well identified in the document. For example, each WMO has to develop their own waste acceptance rules, and plan for the economics and the funding of their waste management programmes. The challenge at hand for the IGD-TP is to deploy the SRA. This is carried out by agreeing on a Deployment Plan (DP) that guides organizing the concrete joint activities between the WMOs and the other participants of the IGD-TP. The first DP points out the coordinated RD and D projects and other activities that need to be launched to produce these results over the next four to five years (by the end of 2016). The DP also describes general principles for how the joint work can be organised and funded. (authors)

Ouzounian, P. [ANDRA, Chatenay-Malabry (France); Palmu, Marjatta [Posiva Oy, Eurajoki (Finland); Eng, Torsten [SKB, Stockholm (Sweden)

2012-07-01T23:59:59.000Z

482

TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic  

Broader source: Energy.gov (indexed) [DOE]

Summaries Rail Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group May 17, 2007 January 16, 2007 August 31, 2006 July 27, 2006 June 8, 2006 April 20, 2006 March 9, 2006 January 26, 2006 November 9, 2005 September 15, 2005 April 28, 2005 March 24, 2005 February 24, 2005 January 27, 2005 December 16, 2004 October 28, 2004 May 17, 2004 June 2, 2003 June 26, 2002 March 26, 1999 November 13, 1998 Meeting October 6, 1998 Meeting September 11, 1998 Meeting June 22, 1998 Meeting May 27, 1998 Meeting November 3, 1997 Meeting September 18, 1997 Meeting More Documents & Publications TEC Working Group Topic Groups Routing Conference Call Summaries TEC Working Group Topic Groups Rail Meeting Summaries TEC Working Group Topic Groups Rail Conference Call Summaries Inspections

483

Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Deployment of Hybrid Deployment of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on Twitter Bookmark Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on Google Bookmark Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on Delicious Rank Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on Digg Find More places to share Alternative Fuels Data Center: Deployment of Hybrid and Plug-In Electric Vehicles on AddThis.com... More in this section... Electricity Basics Benefits & Considerations

484

Workshop on Scalable Cyber-Security Challenges in Large-Scale Networks: Deployment Obstacles  

E-Print Network [OSTI]

Workshop on Scalable Cyber-Security Challenges in Large-Scale Networks: Deployment Obstacles Large, and Definitions of Cybersecurity.... 8 Conventional Wisdom is Inadequate....................................... 9 Directions in Scalable Cyber-Security in Large-Scale Networks: Deployment Obstacles." The workshop

Feigenbaum, Joan

485

CIMEL SUN PHOTOMETERS: UPDATES ON NEW DEPLOYMENTS AND CLOUD MODE ZENITH RADIANCE DATA  

E-Print Network [OSTI]

CIMEL SUN PHOTOMETERS: UPDATES ON NEW DEPLOYMENTS AND CLOUD MODE ZENITH RADIANCE DATA Richard of Science ABSTRACT Since March 1998, ARM has deployed Cimel Sun PHOTometers (CSPHOT) at several but not all

486

Ocean Power Technologies (TRL 7 8 System) - Reedsport PB150 Deployment...  

Broader source: Energy.gov (indexed) [DOE]

Ocean Power Technologies (TRL 7 8 System) - Reedsport PB150 Deployment and Ocean Test Project Ocean Power Technologies (TRL 7 8 System) - Reedsport PB150 Deployment and Ocean Test...

487

Designing and testing the neutron source deployment system and calibration plan for a dark matter detector  

E-Print Network [OSTI]

In this thesis, we designed and tested a calibration and deployment system for the MiniCLEAN dark matter detector. The deployment system uses a computer controlled winch to lower a canister containing a neutron source into ...

Westerdale, Shawn (Shawn S.)

2011-01-01T23:59:59.000Z

488

Air Quality and Intelligent Transportation Systems: Understanding Integrated Innovation, Deployment and Adaptation of Public Technologies  

E-Print Network [OSTI]

Air Quality and Intelligent Transportation Systems: Understanding Integrated Innovation, Deployment;2 Air Quality and Intelligent Transportation Systems: Understanding Integrated Innovation, Deployment between state and local transportation investments and metropolitan air quality goals. In this context

de Weck, Olivier L.

489

U.S. Fuel Cell Market Production and Deployment Continues Strong...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

U.S. Fuel Cell Market Production and Deployment Continues Strong Growth U.S. Fuel Cell Market Production and Deployment Continues Strong Growth January 8, 2014 - 12:00am Addthis...

490

Development and Deployment of Generation 3 Plug-In Hybrid Electric...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Deployment of Generation 3 Plug-In Hybrid Electric School Buses Development and Deployment of Generation 3 Plug-In Hybrid Electric School Buses 2011 DOE Hydrogen and Fuel Cells...

491

Summary Report For The Analysis Of The Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample For Canister S04023  

SciTech Connect (OSTI)

In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sluldge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass.

Johnson, F. C.

2013-11-18T23:59:59.000Z

492

Commercialization and Deployment at NREL: Advancing Renewable Energy and Energy Efficiency at Speed and Scale  

SciTech Connect (OSTI)

A White Paper overview of NREL's commercialization and deployment activities, requested by the chair of the State Energy Advisory Board.

Not Available

2011-05-11T23:59:59.000Z

493

DOE Hydrogen and Fuel Cells Program Record, Record # 13008: Industry Deployed Fuel Cell Powered Lift Trucks  

Broader source: Energy.gov [DOE]

This program record from the DOE Hydrogen and Fuel Cells Program focuses on deployments of fuel cell powered lift trucks.

494

Depleted UF6 Conversion facility EIS Topics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Topics Topics Depleted UF6 Conversion Facility EIS Topics A listing of topics included in the Depleted UF6 Conversion Facility EISs. DOE addressed the following environmental issues when assessing the potential environmental impacts of the alternatives in the two site-specific EISs. DOE solicited comment from the Federal agencies, Native American tribes, state and local governments, and the general public on these and any other issues as part of the public scoping process: Potential impacts on health from DUF6 conversion activities, including potential impacts to workers and the public from exposure to radiation and chemicals during routine and accident conditions for the construction, operation, maintenance, and decontamination and decommissioning of DUF6 conversion facilities.

495

MC-CAM Research Topics Organic LEDs  

E-Print Network [OSTI]

MC-CAM Research Topics Organic LEDs Phosphors and materials for solid state lighting Battery materials with highly- controlled microstructures Next generation optical storage media Products based for advanced display technologies Mitsubishi Chemical Center for Advanced Materials MRL Building University

Bigelow, Stephen

496

Safety Topic: Rota/ng Equipment  

E-Print Network [OSTI]

Safety Topic: Rota/ng Equipment Jus/n Kleingartner #12;Safety protocols 2 #12;Safety protocols for opera/ng a lathe · Don'ts: ­ Do not wear gloves

Cohen, Robert E.

497

Topics in Contemporary Mathematics Instructor: Sam Smith  

E-Print Network [OSTI]

MATH 1171 Topics in Contemporary Mathematics Syllabus Fall 2009 Instructor: Sam Smith Office: Barbelin 212, email smith@sju.edu, x1559 Office Hours: Tue 10:00-11:30, 1:00-2:30,Thur 10

Smith, Sam

498

Micromechanical modeling of deployment and shape recovery of thin-walled viscoelastic composite space  

E-Print Network [OSTI]

Micromechanical modeling of deployment and shape recovery of thin-walled viscoelastic composite;Micromechanical Modeling of Deployment and Shape Recovery of Thin-walled Viscoelastic Composite Space Structures of the paper presents an experimental study of the deployment and shape recovery of composite tape

Pellegrino, Sergio

499

Rigid Deployable Solar Array A.M. Watt and S. Pellegrino  

E-Print Network [OSTI]

with the design of low-cost rigid-panel deployable solar arrays with self- locking tape-spring hinges. The reportRigid Deployable Solar Array A.M. Watt and S. Pellegrino CUED/D-STRUCT/TR214 Department on the deployment of a solar array wing are evaluated experimentally. #12;#12;Contents 1 Introduction 1 1.1 Layout

Pellegrino, Sergio

500

Data:Fdf7b4f1-acad-4144-a6f5-4873a2118986 | Open Energy Information  

Open Energy Info (EERE)

Fdf7b4f1-acad-4144-a6f5-4873a2118986 Fdf7b4f1-acad-4144-a6f5-4873a2118986 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 600kW Demand 8am-10pm with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.