Powered by Deep Web Technologies
Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Demonstration Project 111 ITS/CVO Technology Truck Final Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

1277 Demonstration Project 111 ITSCVO Technology Truck Final Project Report December 2001 Prepared by G. J. Capps, ORNL Project Manager K. P. Gambrell, Technical Associate K. L....

2

WSF Biodiesel Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

2009-04-30T23:59:59.000Z

3

LIMB Demonstration Project Extension and Coolside Demonstration. [Final report  

SciTech Connect

This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

Goots, T.R.; DePero, M.J.; Nolan, P.S.

1992-11-10T23:59:59.000Z

4

Nome, Alaska, Wind Turbine Demonstration Project Final Environmental Assessment and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment and Final Environmental Assessment and Finding of No Significant Impact November 2000 Prepared for: U.S. Department of Energy Golden Field Office 1617 Cole Blvd. Golden, CO 80401 Prepared by: Battelle Memorial Institute 505 King Avenue Columbus, OH 43201 Nome, Alaska, Wind Turbine Demonstration Project Finding of No Significant Impact Nome, Alaska, Wind Turbine Demonstration Project FINDING OF NO SIGNIFICANT IMPACT S U M M A R Y The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) to provide DOE and other public agency decision makers witb tbe environmental documentation required to take informed discretionary action on the proposed Nome, Alaska, Wind Turbine Demonstration Project (DOE/EA-1280). The EA assesses the potential environmental impacts and cumulative i

5

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEST VALLEY DEMONSTRATION PROJECT WEST VALLEY DEMONSTRATION PROJECT WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY December 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY DOE/EIS - 0337F For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE 10282 Rock Springs Road WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National

6

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WVDP Waste Management EIS WVDP Waste Management EIS S-3 Figure S-1. Location of the West Valley Demonstration Project Not to scale Final WVDP Waste Management EIS S-23 Table S-2. Summary of Normal Operational Impacts at West Valley Impact Area Unit of Measure No Action Alternative Alternative A - Preferred Alternative B Human Health Impacts a Public Impacts from Ongoing Operations MEI LCF 3.7 Ă— 10 -7 3.7 Ă— 10 -7 3.7 Ă— 10 -7 Population LCF 1.5 Ă— 10 -3 1.5 Ă— 10 -3 1.5 Ă— 10 -3 Worker Impacts Involved worker MEI LCF 3.4 Ă— 10 -4 1.3 Ă— 10 -3 1.3 Ă— 10 -3 Noninvolved worker MEI LCF 3.0 Ă— 10 -4 3.0 Ă— 10 -4 3.0 Ă— 10 -4 Involved worker population LCF 2.1 Ă— 10 -3 0.031 0.031 Noninvolved worker population LCF 0.075 0.075 0.075 Total worker population LCF 0.077 0.11 0.11

7

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

8

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

9

Nucla circulating atmospheric fluidized bed demonstration project. Final report  

Science Conference Proceedings (OSTI)

Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

Not Available

1991-10-01T23:59:59.000Z

10

BACA Project: geothermal demonstration power plant. Final report  

DOE Green Energy (OSTI)

The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

Not Available

1982-12-01T23:59:59.000Z

11

Integrated passive-solar demonstration project. Final report  

Science Conference Proceedings (OSTI)

The objectives of the study reported were to collect data on a combination of several passive solar heating and cooling systems. A passive solar test structure was constructed and monitored and the demonstration of passive systems designed into the structure was evaluated. Passive solar cooling principles include: shading all mass walls and windows from direct solar gain, maintaining cool attic and ceiling temperatures using solar induced ventilation, maintaining cool mean radiant wall temperatures, recirculating internal air, and using natural cross-ventilation through the conditioned space in spring and fall. Passive solar heating principles include: orientation of windows and sunspaces towards the south, providing double pane south windows, providing a double pane solar sunspace, using night insulation over glazing, extended thermal storage mass, and using a fan-forced rock/earth/air storage system. (LEW)

Garrison, M.L.

1982-09-01T23:59:59.000Z

12

BACA Project: geothermal demonstration power plant. Final report  

SciTech Connect

The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

1982-12-01T23:59:59.000Z

13

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A-1 A-1 APPENDIX A CONSULTATION LETTERS This appendix includes consultation/approval letters between the U.S. Department of Energy and the U.S. Fish and Wildlife Service regarding threatened and endangered species, and between other state and Federal agencies as needed. Consultation Letters A-2 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-3 Consultation Letters A-4 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-5 Consultation Letters A-6 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-7 Consultation Letters A-8 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement B-1 APPENDIX B NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE

14

Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 OF 3 DOE / EIS-0361 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Agency: U.S. Department of Energy Title: Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361) Location: Rainelle, West Virginia Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Roy Spears, Document Manager National Energy Technology Laboratory U.S. Department of Energy 3610 Collins Ferry Road

15

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 U.S. Department of Energy Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement November 2002 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project Final Environmental Impact Statement (EIS) (DOE/EIS-0318) Location: Clark County, Kentucky Contacts: For further information on this environmental For further information on the DOE National impact statement (EIS), call: Environmental Policy Act (NEPA) process, call: 1-800-432-8330 ext. 5460 1-800-472-2756 or contact: or contact: Mr. Roy Spears Ms. Carol Borgstrom

16

Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report  

DOE Green Energy (OSTI)

In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15 states.

Gambrell, KP

2002-01-11T23:59:59.000Z

17

Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report  

SciTech Connect

The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

NONE

1996-04-30T23:59:59.000Z

18

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments Comments Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement Clark County Public Library Winchester, KY Page 1 of 5 D-1 Comment No. 1 Issue Code: 11 Gasification is different from incineration. It is a better, more environmentally responsible approach to generating energy from the use of fossil fuels and refuse derived fuel (RDF). Incineration produces criteria pollutants, semi-volatile and volatile organic compounds and dioxin/furan compounds. Ash from hazardous waste incinerators is considered a hazardous waste under the Resource Conservation and Recovery Act (RCRA). In contrast, gasification, which occurs at high temperatures and pressures, produces no air emissions, only small amounts of wastewater containing salts. Synthesis gas (syngas)

19

Final Report on the PREMIO Experimental Results: EDF Smart Grid Demonstration Project  

Science Conference Proceedings (OSTI)

PREMIO is a French acronym for “Production Répartie, Enr et MDE, Intégrées et Optimisées” or in English, “Integration and Optimization of DG, DSM & Renewable Energies.” The term PREMIO is used in this document in reference to the project and the working consortium, as well as the Virtual Power Plant. Electricité de France (EDF) supports the PREMIO demonstration project in the south of France. PREMIO combines the control of installed ...

2013-11-25T23:59:59.000Z

20

Phase 1 Final status survey plan for the West Valley demonstration project.  

SciTech Connect

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

Johnson, R. L. (Environmental Science Division)

2011-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report  

Science Conference Proceedings (OSTI)

Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

2009-09-09T23:59:59.000Z

22

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

The abundance of coal in the United States makes it one of our Nation's most important strategic resources in building a secure energy future. With today's prices and technology, recoverable reserves located in the United States could supply the Nation's coal consumption for approximately 250 years at current usage rates. However, if coal is to reach its full potential as an environmentally acceptable source of energy, an expanded menu of advanced clean coal technologies must be developed to provide substantially improved options both for the consumer and private industry. Before any technology can be seriously considered for commercialization, it must be demonstrated at a sufficiently large-scale to develop industry confidence in its technical and economic feasibility. The implementation of a federal technology demonstration program is the established means of accelerating the development of technology to meet national energy strategy and environmental policy goals, to reduce the risk to human health and the environment to an acceptable level, to accelerate commercialization, and to provide the incentives required for continued activity in research and development directed at providing solutions to long-range energy problems. The U.S. Department of Energy (DOE) prepared this environmental impact statement (EIS) on the proposed Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project in compliance with the National Environmental Policy Act (NEPA).

N /A

2002-12-13T23:59:59.000Z

23

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 SUMMARY The U.S. Department of Energy (DOE) prepared this environmental impact statement (EIS) on the proposed Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project in compliance with the National Environmental Policy Act (NEPA). The National Environmental Policy Act Process NEPA is a federal law that serves as the basic national charter for protection of the environment. For major federal actions that may significantly affect the quality of the environment, NEPA requires federal agencies to prepare a detailed statement that includes the potential environmental impacts of the Proposed Action and reasonable alternatives. A fundamental objective of NEPA is to foster better decisionmaking by ensuring that high quality environmental information is available to public officials and members of the

24

Northview Junior High solar energy demonstration project. Final report, 16 May 1974--16 May 1975  

DOE Green Energy (OSTI)

This report covers a one-year test and evaluation of the Northview Junior High School Solar Energy Demonstration Project. The system provided about 5 percent of the school's energy requirements for the year. This energy was used for space heating, domestic water heating, and pool water heating for a total of 629,000,000 solar supplied Btu's. Average collector efficiency for the year was 44 percent. Operating costs were less than 5 percent of the value of the collected energy. Solar insolation data and system performance data are presented for the various operating modes. Results and conclusions indicate that the supplemental heating of large-scale buildings is feasible and economical. An optimum performance requires a careful matching of load, collectors, and distribution system.

Merrill, G.; Dib, A.

1976-05-01T23:59:59.000Z

25

Northview Junior High solar energy demonstration project. Final report, 16 May 1974--16 May 1975  

SciTech Connect

This report covers a one-year test and evaluation of the Northview Junior High School Solar Energy Demonstration Project. The system provided about 5 percent of the school's energy requirements for the year. This energy was used for space heating, domestic water heating, and pool water heating for a total of 629,000,000 solar supplied Btu's. Average collector efficiency for the year was 44 percent. Operating costs were less than 5 percent of the value of the collected energy. Solar insolation data and system performance data are presented for the various operating modes. Results and conclusions indicate that the supplemental heating of large-scale buildings is feasible and economical. An optimum performance requires a careful matching of load, collectors, and distribution system.

Merrill, G.; Dib, A.

1976-05-01T23:59:59.000Z

26

Electric G-Van demonstration and commercial assessment project. Final report  

DOE Green Energy (OSTI)

The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

Braga, B.D. [Electric Power Research Inst., Palo Alto, CA (United States)] [Electric Power Research Inst., Palo Alto, CA (United States)

1992-12-01T23:59:59.000Z

27

California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report  

E-Print Network (OSTI)

Food and Drug Administration Green Energy Management Systemthe project team used Green Energy Management System (GEMS)the project team used Green Energy Management System (GEMS)

Lewis, Glen

2010-01-01T23:59:59.000Z

28

Final Technical Report: Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

DOE Green Energy (OSTI)

This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology. DTE, BP and NextEnergy established hydrogen filling stations using multiple technologies for on-site hydrogen generation, storage and dispensing. DTE established a hydrogen station in Southfield, Michigan while NextEnergy and BP worked together to construct one hydrogen station in Detroit. BP constructed another fueling station in Burbank, California and provided a full-time hydrogen trailer at San Francisco, California and a hydrogen station located at Los Angeles International Airport in Southern, California. Stations were operated between 2005 and 2011. The Team deployed 30 Gen I Fuel Cell Vehicles (FCVs) in the beginning of the project. While 28 Gen I F-CELLs used the A-Class platform, the remaining 2 were Sprinter delivery vans. Fuel cell vehicles were operated by external customers for real-world operations in various regions (ecosystems) to capture various driving patterns and climate conditions (hot, moderate and cold). External operators consisted of F-CELL partner organizations in California and Michigan ranging from governmental organizations, for-profit to and non-profit entities. All vehicles were equipped with a data acquisition system that automatically collected statistically relevant data for submission to National Renewable Energy Laboratory (NREL), which monitored the progress of the fuel cell vehicles against the DOE technology validation milestones. The Mercedes Team also provided data from Gen-II vehicles under the similar operations as Gen I vehicles to compare technology maturity during program duration.

Ronald Grasman

2011-12-31T23:59:59.000Z

29

Goose River, Maine, demonstration project, January 1978-October 1978. Final report  

DOE Green Energy (OSTI)

The proposed Goose River Project is a commercial power development consisting of 4 power dams and one storage dam. All available energy is to be wholesaled to the Central Maine Power Company, the utility holding the franchise for the area. A description of the economic feasibility of the proposed project is presented.

Not Available

1978-11-24T23:59:59.000Z

30

Tidd PFBC Demonstration Project. Final report, March 1, 1994--March 30, 1995  

Science Conference Proceedings (OSTI)

The Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant was the first utility-scale pressurized fluidized bed combustor to operate in combined-cycle mode in the US. The 45-year old pulverized coal plant was repowered with PFBC components in order to demonstrate that PFBC combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. The three-year demonstration period started on February 28, 1991 and terminated on February 28, 1994. The fourth year of testing started on March 1, 1994 and terminated on March 30, 1995. This report reviews the experience of the 70-MW(e), Tidd PFBC Demonstration Plant during the fourth year of operation.

Bauer, D.A.; Hoffman, J.D.; Marrocco, M.; Mudd, M.J.; Reinhart, W.P.; Stogran, H.K. [American Electric Power Service Corp., Columbus, OH (United States)

1995-08-01T23:59:59.000Z

31

Spent Nuclear Fuel Dry Transfer System Cold Demonstration Project Final Report  

SciTech Connect

The spent nuclear fuel dry transfer system (DTS) provides an interface between large and small casks and between storage-only and transportation casks. It permits decommissioning of reactor pools after shutdown and allows the use of large storage-only casks for temporary onsite storage of spent nuclear fuel irrespective of reactor or fuel handling limitations at a reactor site. A cold demonstration of the DTS prototype was initiated in August 1996 at the Idaho National Engineering and Environmental Laboratory (INEEL). The major components demonstrated included the fuel assembly handling subsystem, the shield plug/lid handling subsystem, the cask interface subsystem, the demonstration control subsystem, a support frame, and a closed circuit television and lighting system. The demonstration included a complete series of DTS operations from source cask receipt and opening through fuel transfer and closure of the receiving cask. The demonstration included both normal operations and recovery from off-normal events. It was designed to challenge the system to determine whether there were any activities that could be made to jeopardize the activities of another function or its safety. All known interlocks were challenged. The equipment ran smoothly and functioned as designed. A few "bugs" were corrected. Prior to completion of the demonstration testing, a number of DTS prototype systems were modified to apply lessons learned to date. Additional testing was performed to validate the modifications. In general, all the equipment worked exceptionally well. The demonstration also helped confirm cost estimates that had been made at several points in the development of the system.

Christensen, Max R; McKinnon, M. A.

1999-12-01T23:59:59.000Z

32

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2009; Composite Data Products, Final Version March 19, 2009  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-03-01T23:59:59.000Z

33

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project; Spring 2008 Composite Data Products, Final Version: February 29, 2008  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through February 2008.

Wipke, K.; Sprik, S.; Kurtz J.

2008-04-01T23:59:59.000Z

34

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-09-01T23:59:59.000Z

35

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2010; Composite Data Products, Final Version March 29, 2010  

SciTech Connect

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2010.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-05-01T23:59:59.000Z

36

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 1  

Science Conference Proceedings (OSTI)

The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3.

Not Available

1993-05-01T23:59:59.000Z

37

Green River Formation Water Flood Demonstration Project: Final report. [October 21, 1992-April, 30, 1996  

Science Conference Proceedings (OSTI)

The objectives were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. Comprehensive reservoir characterization and reservoir simulations of the Monument Butte, Travis and Boundary units were presented in the two published project yearly reports. The primary and the secondary production from the Monument Butte unit were typical of oil production from an undersaturated oil reservoir close to its bubble point. The water flood in the smaller Travis unit appeared affected by natural and possibly by large interconnecting hydraulic fractures. Water flooding the boundary unit was considered more complicated due to the presence of an oil water contact in one of the wells. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter c ore, Formation Micro Imaging logs from several wells and Magnetic Resonance Imaging logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir characterization efforts identified new reservoirs in the Travis and the Boundary units. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2000 barrels per day.

Deo, M.D. [Dept. of Chemical and Fuels Engineering, University of Utah, Salt Lake City (US); Dyer, J.E.; Lomax, J.D. [Inland Resources, Inc., Lomax Exploration Co., Salt Lake City, UT (US); Nielson, D.L.; Lutz, S.J. [Energy and Geoscience Institute at the University of Utah, Salt Lake City (US)

1996-11-01T23:59:59.000Z

38

NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

Terry W. Battiest

2008-06-11T23:59:59.000Z

39

Demand Management Demonstration Project, Stage 5: development of industrial load simulation model. Executive summary. Final report  

SciTech Connect

The purpose of this project was to design, develop, test and document a computer simulation model of electric utility generating costs required to meet industrial power demands and the effects of utility load management on these generating costs. The results showed that the model developed is a well conceived load management testing, marginal costing tool. What if situations can be readily tested to determine their impact on system profile and short run marginal costs. The terms unshaped and shaped refer to customers or system use patterns before and after some load management technique was tested. The total flexibility of the model is only apparent after the user has studied test runs in detail. Hourly marginal costs reveal many unexpected changes as a result of shaping loads. Other unexpected changes due to varying economic dispatch schedules while shaping, illustrate the unprecedental latitude for the user to explore optimum generation and load management combinations. The general concept of the model is depicted in the flow chart on the next page.

1977-04-01T23:59:59.000Z

40

Nucla CFB Demonstration Project  

SciTech Connect

This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

Not Available

1990-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 2  

Science Conference Proceedings (OSTI)

The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports.

Not Available

1993-05-01T23:59:59.000Z

42

Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3  

Science Conference Proceedings (OSTI)

The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

Not Available

1993-05-01T23:59:59.000Z

43

PFBC Utility Demonstration Project  

Science Conference Proceedings (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

44

Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 4  

Science Conference Proceedings (OSTI)

The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report.

Not Available

1993-05-01T23:59:59.000Z

45

Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991  

SciTech Connect

The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

1992-03-01T23:59:59.000Z

46

Solar energy demonstration project  

SciTech Connect

The solar heating demonstration system at the DOE cafeteria at Grand Junction, Colorado, is briefly described. The system will supply an estimated 40 percent of the energy required for domestic hot water and building heat. (WHK)

1978-01-01T23:59:59.000Z

47

LIMB Demonstration Project Extension  

Science Conference Proceedings (OSTI)

The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full- scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO{sub x} and NO{sub x} emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

Not Available

1988-12-15T23:59:59.000Z

48

LIMB Demonstration Project Extension  

Science Conference Proceedings (OSTI)

The basic goal of the Limestone Injection Multistage Burner (LIMB) demonstration is to extend LIMB technology development to a full-scale application on a representative wall-fired utility boiler. The successful retrofit of LIMB to an existing boiler is expected to demonstrate that (a) reductions of 50 percent or greater in SO and NO emissions can be achieved at a fraction of the cost of add-on FGD systems, (b) boiler reliability, operability, and steam production can be maintained at levels existing prior to LIMB retrofit, and (c) technical difficulties attributable to LIMB operation, such as additional slagging and fouling, changes in ash disposal requirements, and an increased particulate load, can be resolved in a cost-effective manner. The primary fuel to be used will be an Ohio bituminous coal having a nominal sulfur content of 3 percent or greater.

Not Available

1988-09-15T23:59:59.000Z

49

Solar Thermal Demonstration Project  

SciTech Connect

HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with â??Kalwallâ?? building panels. An added feature of the â??Kalwallâ?ť system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

Biesinger, K.; Cuppett, D.; Dyer, D.

2012-01-30T23:59:59.000Z

50

LIMB Demonstration Project Extension and Coolside Demonstration  

SciTech Connect

This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

Goots, T.R.; DePero, M.J.; Nolan, P.S.

1992-11-10T23:59:59.000Z

51

Final report of the Department of Energy Reservoir Definition Review Team for the Baca Geothermal Demonstration Project  

DOE Green Energy (OSTI)

The Baca project was terminated due to inability to find sufficient steam production to support the power plant. The following aspects of the project are discussed: regional geology; structure, stratigraphy, and permeability in the Redondo Creek; geophysics; geochemical indicators of reservoir conditions; drilling problems; fracture stimulation experiments; reservoir definition and conceptual model; and prediction of reservoir performance.

Goldstein, N.E.; Holman, W.R.; Molloy, M.W. (eds.)

1982-06-01T23:59:59.000Z

52

Shallow Carbon Sequestration Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Shallow Carbon SequeStration Shallow Carbon SequeStration DemonStration ProjeCt Background The Shallow Carbon Sequestration Pilot Demonstration Project is a cooperative effort involving City Utilities of Springfield (CU); Missouri Department of Natural Resources (MDNR); Missouri State University (MSU); Missouri University of Science & Technology (MS&T); AmerenUE; Aquila, Inc.; Associated Electric Cooperative, Inc.; Empire District Electric Company; and Kansas City Power & Light. The purpose of this project is to assess the feasibility of carbon sequestration at Missouri power plant sites. The six electric utilities involved in the project account for approximately 90 percent of the electric generating capacity in Missouri. Description The pilot demonstration will evaluate the feasibility of utilizing the Lamotte and

53

Toms Creek IGCC Demonstration Project  

SciTech Connect

The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020{degree}F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

Virr, M.J.

1992-11-01T23:59:59.000Z

54

Toms Creek IGCC Demonstration Project  

SciTech Connect

The Toms Creek Integrated Gasification Combined Cycle (IGCC) Demonstration Project was selected by DOE in September 1991 to participate in Round Four of the Clean Coal Technology Demonstration Program. The project will demonstrate a simplified IGCC process consisting of an air-blown, fluidized-bed gasifier (Tampella U-Gas), a gas cooler/steam generator, and a hot gas cleanup system in combination with a gas turbine modified for use with a low-Btu content fuel and a conventional steam bottoming cycle. The demonstration plant will be located at the Toms Creek coal mine near Coeburn, Wise County, Virginia. Participants in the project are Tampella Power Corporation and Coastal Power Production Company. The plant will use 430 tons per day of locally mined bituminous coal to produce 55 MW of power from the gasification section of the project. A modern pulverized coal fired unit will be located adjacent to the Demonstration Project producing an additional 150 MW. A total 190 MW of power will be delivered to the electric grid at the completion of the project. In addition, 50,000 pounds per hour of steam will be exported to be used in the nearby coal preparation plant. Dolomite is used for in-bed gasifier sulfur capture and downs cleanup is accomplished in a fluidized-bed of regenerative zinc titanate. Particulate clean-up, before the gas turbine, will be performed by high temperature candle filters (1020[degree]F). The demonstration plant heat rate is estimated to be 8,700 Btu/kWh. The design of the project goes through mid 1995, with site construction activities commencing late in 1995 and leading to commissioning and start-up by the end of 1997. This is followed by a three year demonstration period.

Virr, M.J.

1992-01-01T23:59:59.000Z

55

Energy Storage Demonstration Project Locations | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demonstration Project Locations Energy Storage Demonstration Project Locations Map of the United States showing the location of Energy Storage Demonstration projects created with...

56

Energy Storage Demonstration Project Locations | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Storage Demonstration Project Locations Energy Storage Demonstration Project Locations Map of the United States showing the location of Energy Storage Demonstration projects...

57

Independent Oversight Review, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation -...

58

Analytical and demonstration experience with changing load profile. Final report  

SciTech Connect

A bibliography of load management and supply management projects, sponsored by EPRI, was developed. Summaries of project scope and results were made for a selection of these projects already completed. Finally, summaries of six utility load management demonstration projects were made, including project descriptions and presentation of selected results.

Isaksen, L.; Khan, S.; Ma, F.S.

1979-12-01T23:59:59.000Z

59

Transportable Combustion Turbine Demonstration Project  

Science Conference Proceedings (OSTI)

New York State Electric and Gas Corporation (NYSEG) installed a 7.15-MW Solar® Taurus™ 70 (nominal 7 MW) gas combustion turbine (CT) at its State Street substation in Auburn, New York. As a demonstration project supported through EPRI's Tailored Collaboration (TC) program, it is intended to aid in better understanding the "complete picture" for siting this particular technology as a distributed resource (DR).

2001-12-14T23:59:59.000Z

60

Clean Coal Diesel Demonstration Project  

DOE Green Energy (OSTI)

A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

Robert Wilson

2006-10-31T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy Efficiency Demonstration Final Report  

Science Conference Proceedings (OSTI)

The Energy Efficiency Demonstration was a field-performance assessment of emerging, efficient end-use technologies, deployed with extensive measurement instrumentation at multiple sites throughout the United States. EPRI collaborated with fourteen utilities spread throughout the United States. The selected technologies were known to have the potential to significantly reduce energy consumption in residential and commercial applications. The technologies demonstrated were: light emitting diode (LED) ...

2012-11-19T23:59:59.000Z

62

TRUEX hot demonstration. Final report  

SciTech Connect

In FY 1987, a program was initiated to demonstrate technology for recovering transuranic (TRU) elements from defense wastes. This hot demonstration was to be carried out with solution from the dissolution of irradiated fuels. This recovery would be accomplished with both PUREX and TRUEX solvent extraction processes. Work planned for this program included preparation of a shielded-cell facility for the receipt and storage of spent fuel from commercial power reactors, dissolution of this fuel, operation of a PUREX process to produce specific feeds for the TRUEX process, operation of a TRUEX process to remove residual actinide elements from PUREX process raffinates, and processing and disposal of waste and product streams. This report documents the work completed in planning and starting up this program. It is meant to serve as a guide for anyone planning similar demonstrations of TRUEX or other solvent extraction processing in a shielded-cell facility.

Chamberlain, D.B.; Leonard, R.A.; Hoh, J.C.; Gay, E.C.; Kalina, D.G.; Vandegrift, G.F.

1990-04-01T23:59:59.000Z

63

Solar heating demonstration. Final report  

DOE Green Energy (OSTI)

The demonstration involved a 4-panel solar collector mounted on the industrial arts building. A 120 gallon storage tank supplements a 66 gallon electric hot water heater which supplies hot water for 5 shop wash basins, girl's and boy's lavatories, and a pressure washer in the auto shop. The installation and educational uses of the system are described. (MHR)

Bonicatto, L.; Kozak, C.

1980-01-01T23:59:59.000Z

64

The ITER Project: International Collaboration to Demonstrate...  

NLE Websites -- All DOE Office Websites (Extended Search)

ITER Project: International Collaboration to Demonstrate Nuclear Fusion American Fusion News Category: U.S. ITER Link: The ITER Project: International Collaboration to Demonstrate...

65

Automated Demand Response Technology Demonstration Project for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings...

66

High-Temperature Superconductivity Cable Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High-Temperature Superconductivity Cable Demonstration Projects High-Temperature Superconductivity Cable Demonstration Projects A National Effort to Introduce New Technology into...

67

Navy fuel cell demonstration project.  

DOE Green Energy (OSTI)

This is the final report on a field evaluation by the Department of the Navy of twenty 5-kW PEM fuel cells carried out during 2004 and 2005 at five Navy sites located in New York, California, and Hawaii. The key objective of the effort was to obtain an engineering assessment of their military applications. Particular issues of interest were fuel cell cost, performance, reliability, and the readiness of commercial fuel cells for use as a standalone (grid-independent) power option. Two corollary objectives of the demonstration were to promote technological advances and to improve fuel performance and reliability. From a cost perspective, the capital cost of PEM fuel cells at this stage of their development is high compared to other power generation technologies. Sandia National Laboratories technical recommendation to the Navy is to remain involved in evaluating successive generations of this technology, particularly in locations with greater environmental extremes, and it encourages their increased use by the Navy.

Black, Billy D.; Akhil, Abbas Ali

2008-08-01T23:59:59.000Z

68

Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling  

SciTech Connect

The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

Muons, Inc.

2011-05-24T23:59:59.000Z

69

West Valley Demonstration Project Transportation Emergency Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance...

70

Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report  

SciTech Connect

This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

Dismukes, E.B.

1994-10-20T23:59:59.000Z

71

Vehicle to Grid Demonstration Project  

SciTech Connect

This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

2010-12-31T23:59:59.000Z

72

Independent Oversight Review, West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) in September 2000.

73

LADWP FUEL CELL DEMONSTRATION PROJECT  

SciTech Connect

Los Angeles Department of Water and Power (LADWP) is currently one of the most active power utility companies in researching fuel cell technology. Fuel cells offer many benefits and are now used as an alternative to traditional internal combustion engines in power generation. In continuing it's role as the leader in fuel cell research, LADWP has installed a pre-commercial molten carbonate fuel cell on August 2001 at its headquarter, the John Ferraro Building (JFB). The goal of this project is to learn more about the actual behavior of the fuel cell running under real world conditions. The fuel cell ran smoothly through the first year of operation with very high efficiency, but with some minor setbacks. The JFB fuel cell project is funded by the City of Los Angeles Department of Water and Power with partial grant funding from the Department of Defense's Climate Change Fuel Cell Buydown Program. The technical evaluation and the benefit-cost evaluation of the JFB fuel cell are both examined in this report.

Thai Ta

2003-09-12T23:59:59.000Z

74

LADWP FUEL CELL DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

Los Angeles Department of Water and Power (LADWP) is currently one of the most active power utility companies in researching fuel cell technology. Fuel cells offer many benefits and are now used as an alternative to traditional internal combustion engines in power generation. In continuing it's role as the leader in fuel cell research, LADWP has installed a pre-commercial molten carbonate fuel cell on August 2001 at its headquarter, the John Ferraro Building (JFB). The goal of this project is to learn more about the actual behavior of the fuel cell running under real world conditions. The fuel cell ran smoothly through the first year of operation with very high efficiency, but with some minor setbacks. The JFB fuel cell project is funded by the City of Los Angeles Department of Water and Power with partial grant funding from the Department of Defense's Climate Change Fuel Cell Buydown Program. The technical evaluation and the benefit-cost evaluation of the JFB fuel cell are both examined in this report.

Thai Ta

2003-09-12T23:59:59.000Z

75

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project - July 2012 Independent Activity Report, New Brunswick Laboratory - November 2011 Orientation Visit to the Paducah Gaseous Diffusion Plant,...

76

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

77

Milestone Project Demonstrates Innovative Mercury Emissions Reduction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Project Demonstrates Innovative Mercury Emissions Milestone Project Demonstrates Innovative Mercury Emissions Reduction Technology Milestone Project Demonstrates Innovative Mercury Emissions Reduction Technology January 12, 2010 - 12:00pm Addthis Washington, DC - An innovative technology that could potentially help some coal-based power generation facilities comply with anticipated new mercury emissions standards was successfully demonstrated in a recently concluded milestone project at a Michigan power plant. Under a cooperative agreement with the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL), WE Energies demonstrated the TOXECON(TM) process in a $52.9million project at the Presque Isle Power Plant in Marquette, Mich. TOXECON is a relatively cost-effective option for achieving significant reductions in mercury emissions and increasing the

78

A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report  

Science Conference Proceedings (OSTI)

The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

Not Available

1994-06-16T23:59:59.000Z

79

Power Plant Optimization Demonstration Projects Cover Photos:  

NLE Websites -- All DOE Office Websites (Extended Search)

5 SEPTEMBER 2007 5 SEPTEMBER 2007 Power Plant Optimization Demonstration Projects Cover Photos: * Top left: Coal Creek Station * Top right: Big Bend Power Station * Bottom left: Baldwin Energy Complex * Bottom right: Limestone Power Plant A report on four projects conducted under separate cooperative agreements between the U.S. Department of Energy and: * Great River Energy * Tampa Electric Company * Pegasus Technologies * NeuCo. , Inc.  Power Plant Optimization Demonstration Projects Executive Summary .......................................................................................4 Background: Power Plant Optimization ......................................................5 Lignite Fuel Enhancement Project ...............................................................8

80

Tidd PFBC Demonstration Project, A DOE Assessment  

Science Conference Proceedings (OSTI)

The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

National Energy Technology Laboratory

2001-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Hampton Roads Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Roads Demonstration Project Roads Demonstration Project Jump to: navigation, search Name Hampton Roads Demonstration Project Facility Hampton Roads Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Virginia State Government Location Chesapeake Bay VA Coordinates 36.965°, -76.289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.965,"lon":-76.289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

82

NETL: News Release - Milestone Project Demonstrates Innovative...  

NLE Websites -- All DOE Office Websites (Extended Search)

the U.S. Department of Energy's (DOE's) National Energy Technology Laboratory (NETL), WE Energies demonstrated the TOXECON(TM) process in a 52.9million project at the Presque...

83

Grays Harbor Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Name Grays Harbor Demonstration Project Facility Grays Harbor Demonstration Project Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Grays Harbor Ocean Energy Company LLC Developer Grays Harbor Ocean Energy Company LLC Location Pacific Ocean Coordinates 46.858°, -124.187° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.858,"lon":-124.187,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

84

Smart Grid Demonstration Project Locations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Demonstration Project Locations Smart Grid Demonstration Project Locations Map of the United States showing the location of Smart Grid Demonstration projects created...

85

3M's Motor Challenge Showcase Demonstration Project  

E-Print Network (OSTI)

In January 1994, 3M began the task of optimizing the electric motor systems at 3M Center, a 26 building, 7 million square foot corporate campus. A cross-functional, cross-company team was established which included four 3M employees representing two different departments within 3M, an engineer specializing in demand side management programs from Northern States Power Company, and a sales engineer from General Electric Supply Company. The team was later joined by an engineering specialist from Landis & Staefa, Inc., a building automation controls supplier. The team began the task of identifying the projects that could save energy and provide a reasonable return on 3M's investment on a building by building approach. As surveys were completed, proposals were prepared and presented to management requesting funding. The team continued the process of identifying projects in remaining buildings and took on the responsibility of designing, contracting and implementing projects as funding was approved for those already studied. Follow-up measurements to ascertain that the savings predicted was actually achieved are done before project close-out. This project was submitted and accepted as a Motor Challenge Showcase Demonstration Project. The Motor Challenge is a U.S. Department of Energy initiative to promote the efficient use of energy in electric motor systems. Showcase Demonstration Projects are used to exemplify the benefits that motor system optimization can provide. This Showcase Project is different from most as it emphasizes the process that was developed to carry out a project of this magnitude rather than any single specific technologies or applications. The team has completed the project at 3M Center. Measured savings are $823,000 per year. This paper will discuss the Motor Challenge Showcase Demonstration project that was completed at 3M Center, the motor systems survey methodology the team developed, analysis tools and techniques and the results that have been attained.

Schultz, S. C.

1998-04-01T23:59:59.000Z

86

3M's Motor Challenge Showcase Demonstration Project  

E-Print Network (OSTI)

In January 1994, 3M began the task of optimizing the electric motor systems at 3M Center, a 26 building, 7 million square foot corporate campus. A cross-functional, cross-company team was established which included four 3M employees representing two different departments within 3M, an engineer specializing in demand side management programs from Northern States Power Company, and a sales engineer from General Electric Supply Company. The team was later joined by an engineering specialist from Landis & Gyr, Inc., a building automation controls supplier. The team began the task of identifying the projects that could save energy and provide a reasonable return on 3M's investment on a building by building approach. As surveys were completed, proposals were prepared and presented to management requesting funding. The team continued the process of identifying projects in remaining buildings and took on the responsibility of designing, contracting and implementing projects as funding was approved for those already studied. Follow-up measurements to ascertain that the savings predicted was actually achieved are done before project close-out. This project was submitted and has been accepted as a Motor Challenge Showcase Demonstration Project. The Motor Challenge is a U. S. Department of Energy initiative to promote the efficient use of energy in electric motor systems. Showcase Demonstration Projects are used to exemplify the benefits that motor system optimization can provide. This Showcase Project is different from most as it emphasizes the process that was developed to carry out a project of this magnitude rather than any single specific technologies or applications. The team has nearly completed the studies at 3M Center and is well into the implementation phase with six buildings being complete. Savings identified to date are approximately $810,000 per year. This paper will discuss the Motor Challenge Showcase Demonstration project currently underway at 3M Center, the motor systems survey methodology the team developed, analysis tools and techniques and the results that have been attained.

Schultz, S. C.

1996-04-01T23:59:59.000Z

87

Western Greenbrier Co-Production Demonstration Project  

NLE Websites -- All DOE Office Websites (Extended Search)

contacts contacts Brad tomer Director Office of Major Demonstrations National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4692 brad.tomer@netl.doe.gov nelson Rekos Project Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 304-285-4066 nelson.rekos@netl.doe.gov PaRtIcIPant Western Greenbrier Co-Generation, LLC Lewisburg, WV Western Greenbrier Co-ProduCtion demonstration ProjeCt (disContinued) Project Description The Western Greenbrier Co-Production (WGC) project will generate about 100 megawatts of electricity and commercial quantities of salable ash by-products by burning waste coal presently contained in numerous coal refuse dumps in the vicinity of the plant. These refuse dumps, created by coal cleaning operations over

88

Fuel consolidation demonstration program: Final Report  

Science Conference Proceedings (OSTI)

EPRI, Northeast Utilities, Baltimore Gas and Electric, the US Department of Energy and Combustion Engineering are engaged in a program to develop a system for consolidating spent fuel and a method of storing the consolidated fuel in the spent fuel storage pool which is licensable by the US Nuclear Regulatory Commission. Fuel consolidation offers a means of substantially increasing the capacity of spent fuel storage pools. This is a final report of the Fuel Consolidation Demonstration Program. It provides a review of the overall program, a summary of the results obtained, the lessons learned, and an assessment of the present status of the consolidation system developed in the program. 7 refs., 15 figs., 5 tabs.

Not Available

1990-06-01T23:59:59.000Z

89

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

Eugene S. Grecheck David P. Batalo

2010-11-30T23:59:59.000Z

90

Pecan Street Project, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Project, Inc. Smart Grid Demonstration Project Project, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Pecan Street Project, Inc. Country United States Headquarters Location Austin, Texas Recovery Act Funding $10,403,570.00 Total Project Value $24,656,485.00 Coordinates 30.267153°, -97.7430608° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

91

Cool water demonstration project and its industrial applications  

SciTech Connect

This paper discusses the 100 MW coal gasification combined cycle demonstration project underway at the ''Cool Water'' site of Southern California Edison Company, including the technology, project participants, schedule and opportunities for future industrial users. Industrial applications with multiple product outputs, termed ''polygeneration'', are illustrated with examples for cogeneration and trigeneration. Finally, actions required for planning large-sized gas turbine installations are suggested for today in order to hold open the future options in coal gasification.

Alger, J.; Ahner, D.J.

1982-08-01T23:59:59.000Z

92

Advanced Coal Conversion Process Demonstration (Project)  

DOE Green Energy (OSTI)

This report contains a description of technical progress made on the Advanced Coal Conversion Process Demonstration Project (ACCP). The project is a US Department of Energy Innovative Clean Coal Technology Project. The cooperative agreement defining the project is between DOE and the Rosebud SynCoal Partnership RSCP. The RSCP is a partnership between Western Energy Company (WECo), a subsidiary of Entech, Montana Power's non-utility group, and NRG, a subsidiary of Northern States Power. The ACCP is a method of upgrading low ranked coals by reducing the moisture and sulfur content and increasing the heating value. The facility is being constructed at WECo's Rosebud No. 6 coal mine, west of Colstrip, Montana. This report contains both a history of the process development and a report of technical progress made since the beginning of the Clean Coal 1 cooperative agreement.

Not Available

1991-07-01T23:59:59.000Z

93

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

Science Conference Proceedings (OSTI)

This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; (4) conducting a blast furnace test to demonstrate the compatibility of the coke produced; and (5) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Detailed studies of LTV's site for the installation of the commercial Demonstration Unit with site specific layouts; Environmental Work; Firm commitments for funding from the private sector; and Federal funding to complement the private contribution.

Albert Calderon

1999-06-23T23:59:59.000Z

94

National Fuel Cell Electric Vehicle Learning Demonstration Final Report  

DOE Green Energy (OSTI)

This report discusses key analysis results based on data from early 2005 through September 2011 from the U.S. Department of Energy's (DOE's) Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project, also referred to as the National Fuel Cell Electric Vehicle (FCEV) Learning Demonstration. This report serves as one of many mechanisms to help transfer knowledge and lessons learned within various parts of DOE's Fuel Cell Technologies Program, as well as externally to other stakeholders. It is the fifth and final such report in a series, with previous reports being published in July 2007, November 2007, April 2008, and September 2010.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-07-01T23:59:59.000Z

95

Demonstration Development Project: Large-Scale Post-Combustion CO2 Capture Retrofit Demonstration Project Review  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has reviewed proposed demonstration sites for retrofitting post-combustion CO2 capture onto an existing coal-fired plant. This report discusses and reviews this set of demonstration projects to provide background information and the rationale for EPRI to pursue being involved in one or more of these projects.

2010-12-17T23:59:59.000Z

96

Category:Smart Grid Projects - Regional Demonstrations | Open Energy  

Open Energy Info (EERE)

Demonstrations Demonstrations Jump to: navigation, search Smart Grid Regional Demonstrations Projects category. Pages in category "Smart Grid Projects - Regional Demonstrations" The following 16 pages are in this category, out of 16 total. B Battelle Memorial Institute, Pacific Northwest Division Smart Grid Demonstration Project C Center for the Commercialization of Electric Technologies Smart Grid Demonstration Project Columbus Southern Power Company (doing business as AEP Ohio) Smart Grid Demonstration Project Consolidated Edison Company of New York, Inc. Smart Grid Demonstration Project K Kansas City Power & Light Company Smart Grid Demonstration Project L Long Island Power Authority Smart Grid Demonstration Project L cont. Los Angeles Department of Water and Power Smart Grid Demonstration Project

97

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

Science Conference Proceedings (OSTI)

The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

Not Available

1992-02-01T23:59:59.000Z

98

Duke Energy Notrees Wind Storage Demonstration Project  

Science Conference Proceedings (OSTI)

This EPRI technical update is an interim report summarizing the status of Duke Energy’s Notrees Wind Storage Demonstration Project, which involves integrating a 36-MW battery energy storage system (BESS) from Xtreme Power with the 152.6-MW Notrees Wind Farm. Xtreme Power’s solid lead-acid battery represents one of an emerging number of energy storage devices endowed with the potential to serve multiple ...

2012-12-12T23:59:59.000Z

99

All-Electric Wendy's Restaurant Demonstration Project  

Science Conference Proceedings (OSTI)

How well can the power needs of a small restaurant be met by an all-electric solution? This demonstration project at a fast-food restaurant investigated the energy and economic performance of a suite of high-efficiency electro-technologies including an all-electric cookline; high efficiency lighting; and heat pumps for water heating, space heating, and cooling. The all-electric concept proved to be competitive with the more conventional gas/electric model.

1999-09-16T23:59:59.000Z

100

Session 9: Heber Geothermal Binary Demonstration Project  

DOE Green Energy (OSTI)

The Heber Binary Project had its beginning in studies performed for the Electric Power Research Institute (EPRI), which identified the need for commercial scale (50 Mw or larger) demonstration of the binary cycle technology. In late 1980, SDG&E and the Department of Energy (DOE) signed a Cooperative Agreement calling for DOE to share in 50 percent of the Project costs. Similarly, SDG&E signed Project participation agreements with EPRI, the Imperial Irrigation District, California Department of Water Resources, and Southern California Edison Company, which provided the remaining 50 percent of the required funding. In 1982, the State of California also joined the Project. The objectives of the Heber Binary Project are to demonstrate the potential of moderate-temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology, and to establish schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants. The plant will be the first large-scale power generating facility in the world utilizing the binary conversion process, and it is expected that information resulting from this Project will be applicable to a wide range of moderate-temperature hydrothermal reservoirs, which represent 80 percent of geothermal resources in the United States. To accomplish the plant engineering, design, and equipment procurement, SDG&E has hired Fluor Engineers, Inc., Power Division, of Irvine, California. In early 1982, SDG&E contracted for construction management services with Dravo Constructors, Inc. (DCI) of New York. DCI is responsible for casting the Fluor design into construction packages, letting the construction contracts, and overseeing the construction in the field.

Allen, Richard F.; Nelson, Tiffany T.

1983-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Demonstration project Smart Charging (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

project Smart Charging (Smart Grid Project) project Smart Charging (Smart Grid Project) Jump to: navigation, search Project Name Demonstration project Smart Charging Country Netherlands Headquarters Location Noord-Brabant, Netherlands Coordinates 51.482655°, 5.232169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.482655,"lon":5.232169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

102

Notice of Availability for the Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement (12/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

740 740 Federal Register / Vol. 67, No. 240 / Friday, December 13, 2002 / Notices [FR Doc. 02-31431 Filed 12-12-02; 8:45 am] BILLING CODE 6450-01-C ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6635-7] Environmental Impact Statments; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed December 2, 2002, through December 6, 2002. Pursuant to 40 CFR 1506.9. EIS No. 020498, Draft EIS, SFW, WA, Daybreak Mine Expansion and Habitat Enhancement Project, Habitat Conservation Plan, Issuance of a Multiple Species Permit for Incidental Take, Implementation, Clark County, WA , Comment Period Ends: February 21, 2003. Contact: Tim Romanski

103

Demonstration of a wind energy conversion system in Skamania County, Washington. Final project performance report, September 30, 1980-September 30, 1982  

DOE Green Energy (OSTI)

In May of 1981, the Mars Landing Power Project (MLPP) erected the first modern wind turbine generator (WTG) in the Columbia River Gorge, in Skamania County, Washington. The WTG is a direct current generator with a 14 foot diameter blade, capable of a maximum ouptut of 4 kW in a 27 mile per hour wind. Output is stored in a 350 amp/hour lead-acid battery bank and is used to supply electric power for 3 households. Good performance is reported, in spite of severe storms, ice, and freezing rain. The WTG supplied 2/3 of the power requirements for the three households it served. Public information activities are reported. Future plans include a hot water storage system for use in a greenhouse, and the design and installation of a computer based home heating and cooling maintenance system. (LEW)

Not Available

1982-01-01T23:59:59.000Z

104

Heat Pump Water Heaters Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heat Pump Water Heaters Heat Pump Water Heaters Demonstration Project Building America Stakeholder Meeting Ron Domitrovic Ammi Amarnath 3/1/2012 Austin, TX 2 © 2011 Electric Power Research Institute, Inc. All rights reserved. HPWH Field Demonstration: Research Objectives * Assess heat pump water heater technology by measuring efficiency. * Provide credible data on the performance and reliability of heat pump water heaters. * Assess user satisfaction in a residential setting. 3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Demonstration Host Utilities Target: 40 Units per Utility Installed and Potential Sites by Climate Zone Source: Department of Energy (DOE), Building America climate regions 4 © 2011 Electric Power Research Institute, Inc. All rights reserved. Installation Locations-Southern Company Region

105

Fuel Cell Demonstration Project - 200 kW - Phosphoric Acid Fuel Cell Power Plant Located at the National Transportation Research Center: FINAL REPORT  

DOE Green Energy (OSTI)

Oak Ridge National Laboratory (ORNL) researches and develops distributed generation technology for the Department of Energy, Energy Efficiency and Renewable Energy Distributed Energy Program. This report describes installation and operation of one such distributed generation system, a United Technology Corporation fuel cell located at the National Transportation Research Center in Knoxville, Tennessee. Data collected from June 2003 to June of 2004, provides valuable insight regarding fuel cell-grid compatibility and the cost-benefit of the fuel cell operation. The NTRC fuel cell included a high-heat recovery option so that use of thermal energy improves project economics and improves system efficiency to 59% year round. During the year the fuel cell supplied a total of 834MWh to the NTRC and provided 300MBtu of hot water. Installation of the NTRC fuel cell was funded by the Distributed Energy Program with partial funding from the Department of Defense's Climate Change Fuel Cell Buy Down Program, administered by the National Energy Technology Laboratory. On-going operational expenses are funded by ORNL's utility budget and are paid from operational cost savings. Technical information and the benefit-cost of the fuel cell are both evaluated in this report and sister reports.

Berry, JB

2005-05-06T23:59:59.000Z

106

Newberry EGS Demonstration Project Environmental Analysis (EA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Newberry Volcano Enhanced Geothermal System (EGS) Demonstration Project UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT (BLM) DOI-BLM-OR-P000-2011-0003-EA DOE/EA-1897 ENVIRONMENTAL ASSESSMENT DECEMBER 2011 Location: Federal Geothermal Leases on the West Flank of Newberry Volcano, Deschutes County, 22 miles south of Bend, Oregon Applicant: Davenport Newberry Holdings LLC and AltaRock Energy, Inc. 225 NW Franklin Avenue, Suite 1 Bend, OR 97701 Tel: 541-323-1190 Lead Agency: U.S. Department of the Interior,

107

CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT  

Science Conference Proceedings (OSTI)

This project deals with the demonstration of a coking reactor (Process Development Unit-- PDU-11) using Calderon's proprietary technology for making commercially acceptable coke. The activities of the past quarter were focused on the following: 1. Testing and Designing of the Submerged Quenching Closed System for the Process; 2. Usage of the Cracked Desulfurized Gas as a Reducing Gas to Make Directly Reduced Iron (DRI) in Order to Make the Process Economics Viable; 3. Changes in the Ceramic Liners for Supporting Them in the Coking Reactor; 4. Work Towards Testing of U.S. Steel's Coal in the Existing Process Development Unit in Alliance (PDU-1); 5. Permitting.

Albert Calderon

1998-04-08T23:59:59.000Z

108

Nucla circulating atmospheric fluidized bed demonstration project  

Science Conference Proceedings (OSTI)

Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute's decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

Not Available

1991-10-01T23:59:59.000Z

109

Landfill Gas-to-Electricity Demonstration Project  

DOE Green Energy (OSTI)

Medium Btu methane gas is a naturally occurring byproduct of anaerobic digestion of landfilled municipal solid waste. The energy potential of landfill gas in New York State is estimated to be 61 trillion Btu's per year or the equivalent of 10% of the natural gas used annually in the state. The 18-month Landfill Gas-to-Electricity Demonstration Project conducted at the Fresh Kills Landfill in Staten Island, New York conclusively demonstrated that landfill gas is an acceptable fuel for producing electricity using an internal combustion engine/generator set. Landfill gas proved to be a reliable and consistent fuel source during a six-month field test program. Engine exhaust emissions were determined to be comparable to that of natural gas and no unusually high corrosion rates on standard pipeline material were found.

Not Available

1982-10-01T23:59:59.000Z

110

Expedited Technology Demonstration Project Baseline Revision 3.0  

SciTech Connect

The Expedited Technology Demonstration Project Plan, MWNT Revised Baseline 3.0, replaces and significantly modifies the current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is shown. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in FY97, followed by the activation of final forms in FY98.

Adamson, M.G.; Densley, P.J.

1996-10-01T23:59:59.000Z

111

MHK Projects/Pulse Stream 100 Demonstration Project | Open Energy  

Open Energy Info (EERE)

Pulse Stream 100 Demonstration Project Pulse Stream 100 Demonstration Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.6405,"lon":-0.16257,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

112

Brown Grease to Biodiesel Demonstration Project Report  

Science Conference Proceedings (OSTI)

Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional resource recovery centers. This view is a direct result of increasingly stringent regulations, concerns over energy use, carbon footprint, and worldwide depletion of fossil fuel resources. Resources in wastewater include chemical and thermal energy, as well as nutrients, and water. A waste stream such as residual grease, which concentrates in the drainage from restaurants (referred to as Trap Waste), is a good example of a resource with an energy content that can be recovered for beneficial reuse. If left in wastewater, grease accumulates inside of the wastewater collection system and can lead to increased corrosion and pipe blockages that can cause wastewater overflows. Also, grease in wastewater that arrives at the treatment facility can impair the operation of preliminary treatment equipment and is only partly removed in the primary treatment process. In addition, residual grease increases the demand in treatment materials such as oxygen in the secondary treatment process. When disposed of in landfills, grease is likely to undergo anaerobic decay prior to landfill capping, resulting in the atmospheric release of methane, a greenhouse gas (GHG). This research project was therefore conceptualized and implemented by the San Francisco Public Utilities Commission (SFPUC) to test the feasibility of energy recovery from Trap Waste in the form of Biodiesel or Methane gas. The research goals are given below: �¢���¢ To validate technology performance; �¢���¢ To determine the costs and benefits [including economic, socioeconomic, and GHG emissions reduction] associated with co-locating this type of operation at a municipal wastewater treatment plant (WWTP); �¢���¢ To develop a business case or model for replication of the program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP�¢����s anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project�¢����s environmental impacts were expected to include: �¢���¢ Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biod

San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

2013-01-30T23:59:59.000Z

113

Category:Smart Grid Projects - Energy Storage Demonstrations | Open Energy  

Open Energy Info (EERE)

Energy Storage Demonstrations Energy Storage Demonstrations Jump to: navigation, search Smart Grid Energy Storage Demonstration Projects category. Pages in category "Smart Grid Projects - Energy Storage Demonstrations" The following 16 pages are in this category, out of 16 total. 4 44 Tech Inc. Smart Grid Demonstration Project A Amber Kinetics, Inc. Smart Grid Demonstration Project B Beacon Power Corporation Smart Grid Demonstration Project C City of Painesville Smart Grid Demonstration Project D Duke Energy Business Services, LLC Smart Grid Demonstration Project E East Penn Manufacturing Co. Smart Grid Demonstration Project K Ktech Corporation Smart Grid Demonstration Project N New York State Electric & Gas Corporation Smart Grid Demonstration Project P Pacific Gas & Electric Company Smart Grid Demonstration Project

114

Property:Did The Test Results Demonstrate Projected Performance...  

Open Energy Info (EERE)

Did The Test Results Demonstrate Projected Performance? Jump to: navigation, search Property Name Did The Test Results Demonstrate Projected Performance? Property Type Text...

115

The Southern California Conversion Technology Demonstration Project | Open  

Open Energy Info (EERE)

The Southern California Conversion Technology Demonstration Project The Southern California Conversion Technology Demonstration Project Jump to: navigation, search Tool Summary Name: The Southern California Conversion Technology Demonstration Project Agency/Company /Organization: The Southern California Conversion Technology Demonstration Project Sector: Energy, Land Focus Area: - Waste to Energy Phase: Create a Vision Resource Type: Publications User Interface: Website Website: www.socalconversion.org/resources.html Cost: Free The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L. A. County. Overview The Southern California Conversion Technology Demonstration Project website is focused on a specific conversion technology demonstration project in L.

116

DOE Funds 21 Research, Development and Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development and Demonstration Projects for up to 78 Million to Promote Enhanced Geothermal Systems DOE Funds 21 Research, Development and Demonstration Projects for up to 78...

117

Smart Grid Regional and Energy Storage Demonstration Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional and Energy Storage Demonstration Projects: Awards Smart Grid Regional and Energy Storage Demonstration Projects: Awards List of Smart Grid Regional and Energy Storage...

118

High-Temperature Superconductivity Cable Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Temperature Temperature Superconductivity Cable Demonstration Projects Superconductivity Power Equipment www.oe.energy.gov Phone: 202-586-1411 Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585. Plugging America Into the Future of Power "A National Effort to Introduce New Technology into the Power Delivery Infrastructure" "In order to meet President Obama's ambitious energy goals, we must modernize the nation's electrical grid to improve the transmission, storage and reliability of clean energy across the country and help to move renewable energy from the places it can be produced to the places it can be used. The Department of Energy is working with industry partners to develop the

119

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

DOE Green Energy (OSTI)

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

120

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

SciTech Connect

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Wave Power Demonstration Project at Reedsport, Oregon  

SciTech Connect

Ocean wave power can be a significant source of large?scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy? to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high?voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon?based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take?off subsystem are complete; additionally the power take?off subsystem has been successfully integrated into the spar.

Mekhiche, Mike [Principal Investigator] [Principal Investigator; Downie, Bruce [Project Manager] [Project Manager

2013-10-21T23:59:59.000Z

122

PFBC Utility Demonstration Project. Annual report, 1991  

Science Conference Proceedings (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

123

Heber geothermal demonstration power plant. Final report  

DOE Green Energy (OSTI)

The binary power plant is to be a 45 MW net electrical facility deriving energy from the low salinity (14,000 ppM), moderate temperature (360/sup 0/F, 182/sup 0/C) Heber reservoir in Southern California. The optimized baseline design established for the power plant is described, and the design and optimization work that formed the basis for the baseline design is documented. The work accomplished during Phase II, Preliminary Design is also recorded, and a base provided from which detailed plant design could be continued. Related project activities in the areas of licensing, environmental, cost, and schedule are also described. The approach used to establish the Phase II optimized baseline design was to (1) review the EPRI Phase I conceptual design and feasibility studies; (2) identify current design criteria and state-of-the-art technology; and (3) develop a preliminary design optimized to the Heber site based on utiliity standards.

Not Available

1979-06-01T23:59:59.000Z

124

The Way Ahead - West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update Update Project Update The Way Ahead The Way Ahead West Valley Demonstration Project Not to be Considered as a Regulatory Submittal Pre-decisional Draft 19817_1 The Way Ahead The Way Ahead Bryan Bower, DOE Director HLW Corporate Board October 6, 2008 FY 2008 Accomplishments Safety Performance Planned vs Actual 2.1 2.3 2 2 2.3 1.9 1.9 1.5 2 2.5 Actual Performance 1 Million Hours (9/3/08) 2007 DOE complex avg. TRC Safety Performance Planned vs Actual 2.1 2.3 2 2 2.3 1.9 1.9 1.5 2 2.5 Actual Performance 1 Million Hours (9/3/08) 2007 DOE complex avg. TRC One Million One Million Safe Work Hours! Safe Work Hours! TRC 0.5 DART 0.0 No lost-time injuries in FY 2008 Not to be Considered as a Regulatory Submittal Pre-decisional Draft 19817_2 0 0.0 0.0 0.0 0.0 0.0 1.4 1.4 1.4 1.4 0.8 0.3 0.3 0.3 1.2 1.2 1.3 1.3 1.0 0.8 0.8 0.3 0.3 0.3 0.3 0 0.5 1 Sep -07 O ct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Ju n-08

125

Final Results from U.S. FCEV Learning Demonstration (Presentation)  

DOE Green Energy (OSTI)

This presentation discusses the objectives of the U.S. DOE Fuel Cell Electric Vehicle Learning Demonstration Project, describes NREL's technology validation approach, and summarizes key technical results from the project.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-05-01T23:59:59.000Z

126

Small-Scale Hydroelectric Power Demonstration Project  

DOE Green Energy (OSTI)

The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

Gleeson, L.

1991-12-01T23:59:59.000Z

127

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 More...

128

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT Demonstration: California Energy Commission Prepared by: Electric Power Research Institute #12; Prepared by: Primary: California Energy Commission Jamie Patterson Contract Manager Fernando Pina Office Manager Energy Efficiency

129

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Commission DC Direct Current DUA Distributed Utility Associates EPRI Electric Public ResearchPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT SITRAS® STATIC ENERGY STORAGE (SES) SYSTEM DEMONSTRATION PROGRAM Prepared for: California Energy Commission Prepared by

130

Think City Electric Vehicle Democstration Program Final Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

7182005 AWARD DE-FG26-O1ID14048 THNK city ELECTRIC VEHICLE DEMONSTRATION PROGRAM FINAL PROJECT REPORT June 2005 Ford Motor Company Sustainable Mobility Technologies 2 7182005...

131

Water and Wastewater Technology Demonstration Projects  

Science Conference Proceedings (OSTI)

This project was funded jointly by the Electric Power Research Institute (EPRI), Southern California Edison (SCE), and the California Energy Commission (CEC), with project management by SCE. The primary objective was to identify and develop technologies that could help California's water/wastewater industry reduce the cost of water and wastewater treatment and improve the overall operation at treatment facilities. Metropolitan Water District (MWD) and Orange County Water District (OCWD) were commissioned...

2002-07-15T23:59:59.000Z

132

NETL: Clean Coal Demonstrations - Project Performance Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Deepwater Technology Enhanced Oil Recovery Gas Hydrates Natural Gas Resources Contacts Coal & Power Systems Major Demonstrations Innovations for Existing Plants Gasification...

133

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2010.

Wipke, K.; Spirk, S.; Kurtz, J.; Ramsden, T.

2010-09-01T23:59:59.000Z

134

Calpine Enhanced Geothermal Systems Project Final Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

Calpine Enhanced Geothermal Systems Project Final Environmental Assessment June 2010 Prepared for: U.S. Department of Energy 1617 Cole Boulevard Golden, CO 80401 Prepared by: RMT...

135

Project Green Thumb: A Demonstration in Wisconsin  

Science Conference Proceedings (OSTI)

A prototype of NOAA's proposed Green Thumb agricultural information dissemination system was demonstrated at five different sites across Wisconsin during the period July–October 1979. Those viewing the system were asked to complete questionnaires ...

David Suchman

1980-04-01T23:59:59.000Z

136

Utility Scale Wind turbine Demonstration Project  

SciTech Connect

The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

Terry Fredericks

2006-03-31T23:59:59.000Z

137

West Valley Demonstration Project Phase I Decommissioning - Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Phase I Decommissioning - Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement The Department of Energy, West Valley Demonstration Project (DOE-WVDP) and CH2M Hill B&W West Valley (CHBWV) are committed to continuous improvement and will utilize principles of the DOE Environmental Management (DOE-EM) Partnering Policy to create and foster a team environment to successfully complete the West Valley Demonstration Project (WVDP) Phase I Decommissioning - Faciltiy Disposition. West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement More Documents & Publications CX-009527: Categorical Exclusion Determination

138

Operational results of National Solar Demonstration Projects  

Science Conference Proceedings (OSTI)

Included in the National Solar Demonstration Program are examples of earth-sheltered, passive solar designs. The data obtained from these sites presents an interesting look at what is both technically and economically feasible. Data from four demonstration sites that are members of the National Solar Data Network are utilized to present an economic and technical analyses of a group of four sites. Three of these sites are earth sheltered residential structures, the fourth is a commercial passive structure. This sample of four demonstration sites is not intended to provide a statistical representation of passive earth sheltered structures, but rather, an example of the type of information available through the National Solar Data Program and how this information may be utilized.

Waite, E.V.

1981-01-01T23:59:59.000Z

139

East Penn Manufacturing Co. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Manufacturing Co. Smart Grid Demonstration Project Manufacturing Co. Smart Grid Demonstration Project Jump to: navigation, search Project Lead East Penn Manufacturing Co. Country United States Headquarters Location Lyon Station, Pennsylvania Recovery Act Funding $2,245,523.00 Total Project Value $4,491,046.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The East Penn Manufacturing Co. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in Lyon Station, Pennsylvania. Overview Demonstrate the economic and technical viability of a 3MW grid-scale, advanced energy storage system using the lead-carbon UltraBattery technology to regulate frequency and manage energy demand. This project

140

Newberry Volcano EGS Demonstration Geothermal Project | Open Energy  

Open Energy Info (EERE)

Volcano EGS Demonstration Geothermal Project Volcano EGS Demonstration Geothermal Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Newberry Volcano EGS Demonstration Project Type / Topic 1 Recovery Act: Enhanced Geothermal System Demonstrations Project Type / Topic 2 EGS Demonstration Project Description The project will demonstrate EGS power generation from the Newberry Known Geothermal Resource Area ("Newberry"). Four deep, high temperature, very low permeability, production-size wells have been completed at Newberry, including two currently owned by Davenport. The Newberry project site exemplifies unparalleled EGS potential in the United States, with a large, high-temperature, conductive thermal anomaly yielding wells with permeability orders of magnitude less than conventional hydrothermal wells.

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Innovative Manufactured Housing Urban Design Demonstration Project  

Science Conference Proceedings (OSTI)

One quarter of the new houses sold in the United States in 1999 were manufactured homes, and manufactured housing represents an important and growing market for power producers. One niche market opportunity for manufactured homes is in urban areas. EPRI facilitated the completion of two limited demonstrations of energy efficient manufactured homes designed specifically for urban neighborhoods.

2000-10-05T23:59:59.000Z

142

Newberry EGS Demonstration Project Environmental Analysis (EA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

compl ex pathw ays, i s hi ghl y unl i kel y tracers w i l l be one of the onl y def i ni ti ve w ays to demonstrate communi cati on. 4 Suggested tracer analysis is...

143

Poland petroleum refinery sludge lagoon demonstration project  

SciTech Connect

The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern.

Altman, D.J.

2000-05-05T23:59:59.000Z

144

Nucla circulating atmospheric fluidized bed demonstration project  

Science Conference Proceedings (OSTI)

During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

Not Available

1991-01-31T23:59:59.000Z

145

Calderon Cokemaking Process/Demonstration Project  

Science Conference Proceedings (OSTI)

During this reporting period an agreement was entered into with Bechtel Corporation for design and construction of Calderon cokemaking facilities (see enclosed letter of February 28, 1997). A second agreement with Bechtel Enterprises to commercialize the Calderon technology as a worldwide business has progressed; during the forthcoming quarter, it is expected to have in place an agreement with Bechtel Enterprises (see attached letter of February 20, 1997). Thyssen Still Otto Anlagentechnik (TSOA), the world's largest builder of conventional cokemaking facilities indicated that it would be please to join Bechtel and Calderon in the demonstration and implementation of Calderon's cokemaking technology (see attached letter of January, 1997).

None

1998-04-08T23:59:59.000Z

146

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

Science Conference Proceedings (OSTI)

This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

Not Available

1991-01-01T23:59:59.000Z

147

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project  

SciTech Connect

The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association's Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

Not Available

1992-02-01T23:59:59.000Z

148

Final Results from U.S. FCEV Learning Demonstration: Preprint  

DOE Green Energy (OSTI)

The 'Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project,' also known as the National Fuel Cell Electric Vehicle Learning Demonstration, is a U.S. Department of Energy (DOE) project started in 2004 and concluded in late 2011. The purpose of this project was to conduct an integrated field validation that simultaneously examined the performance of fuel cell vehicles and the supporting hydrogen fueling infrastructure. The DOE's National Renewable Energy Laboratory (NREL) received and analyzed all of the raw technical data collected by the industry partners through their participation in the project over its seven-year duration. This paper reviews highlights from the project and draws conclusions about the demonstrated status of the fuel cell vehicle and hydrogen fueling infrastructure technology.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2012-04-01T23:59:59.000Z

149

Site Programs & Cooperative Agreements: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration West Valley Demonstration Project Site Programs & Cooperative Agreements: West Valley Demonstration Project West Valley Demonstration Project The Seneca Nation of Indians has interests and concerns regarding the West Valley Demonstration Project Site. Like at Hanford, DOE environmental cleanup activities have the potential to impact natural and cultural resources and to interfere with American Indian religious practices. Through a cooperative agreement, tribal staff is engaged on a frequent basis with DOE and its contractors. The principle activities engaged by tribes include reviewing and commenting on plans and documents, participating in meetings at the request of DOE, monitoring cultural resource sites, participating in site surveys, and identifying issues that

150

Community demonstration of insulated window coverings. Final report  

SciTech Connect

Work performed through the Community Demonstration of Insulated Window Coverings Department of Energy contract included installation of more than 750 square feet of window shades in public buildings throughout Summers County, West Virginia. Window quilts were constructed and placed in the three county senior citizens' centers, a fire department, the county courthouse, the county library, and one school. Energy savings payback from the use of these shades is expected to surpass the cost of the grant within the lifetime of the shades. Other results of the DOE-funded project have met the outlined purposes for which the undertaking was conducted. Community awareness of energy conservation was enhanced through workshops and favorable press coverage. Refinements in working mechanics of the shades and in quilting methods have been an outgrowth of the experimentation which took place. Most importantly, an on-going cottage industry has emerged and has legally incorporated as a producer's cooperative. Finally, the conception of combining traditional quilting skills with the need for energy conservation innovations is proving a natural marriage, as the West Virginia Department of Culture currently helps the co-op put finishing touches on the product. Installation of 17 large shades was slower than anticipated. Delays included unforeseen fire restrictions in assembly buildings, and the need for many design innovations. If it were not for supplemental labor provided through the Green Thumb Senior Employment Program, the budget could have never carried the task to completion. The greatest value of this project may lie beyond the 17 public building installations. The practical experience and design process resulting from the installations should lead to jobs paid for by selling the product that has evolved.

Averill, J.

1982-01-01T23:59:59.000Z

151

Implementation of a Demonstration EGS Project at Naknek, Alaska...  

Open Energy Info (EERE)

Project Type Topic 2 EGS Demonstration Project Description NEA is about to begin drilling a deep, full-diameter well (Naknek-G 1, or simply G-1) that will be spudded in...

152

NETL: Clean Coal Demonstrations - Post-Project (DOE) Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Assessments DOE Assessments Clean Coal Demonstrations DOE Post-Project Assessments DOE Assessment of the Clean Coal Diesel Demonstration Project [PDF-590KB] DOE Assessment of the JEA Large-Scale CFB Combustion Demonstration Project [PDF-177KB] DOE Assessment of the Advanced Coal Conversion Process Demonstration [PDF-649KB] DOE Assessment of the Tampa Electric Integrated Gasification Combined-Cycle Demonstration Project [PDF-550KB] 500-MW Demonstration of Advanced Wall-Fired Combustion Techniques for the Reduction of Nitrogen Oxide (NOx) Emissions from Coal- Fired Boilers: A DOE Assessment [PDF-921KB] Commercial-Scale Demonstration of the Liquid Phase Methanol (LPMEOH™) Process [PDF-382KB] Healy Clean Coal Project: A DOE Assessment [PDF-713KB] Pulse Combustor Design: A DOE Assessment [PDF-569KB]

153

300kW Energy Storage Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kW Energy Storage Demonstration Project Technical Overview Presented at: Annual Doe Peer Review Meeting 2008 DOE Energy Storage & Power Electronics Research Programs By Ib I....

154

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project (Presentation)  

DOE Green Energy (OSTI)

This presentation, which provides information on the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, was given at the Fuel Cell Seminar in November 2004.

Garbak, J.; Gronich, S.; Wipke, K.; Welch, C.

2004-11-01T23:59:59.000Z

155

Green Schools Project Final Report  

SciTech Connect

The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

Verdict, M.

2000-09-27T23:59:59.000Z

156

Independent Activity Report, West Valley Demonstration Project - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activity Report, West Valley Demonstration Project - Activity Report, West Valley Demonstration Project - November 2011 Independent Activity Report, West Valley Demonstration Project - November 2011 November 2011 West Valley Demonstration Project Orientation Visit [HIAR-WVDP-2011-11-07] The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit to the DOE West Valley Demonstration Project (WVDP) Office and the nuclear facility at West Valley, NY, on November 7, 2011. The purpose of the visit was to discuss the nuclear safety oversight strategy, describe the site lead program, increase HSS personnel's operational awareness of the site's activities, and identify specific activities that HSS can perform to carry out its independent oversight

157

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need November 26, 2013 - 12:00pm Addthis Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteer John Schelble helps unload a delivery truck at a food pantry. Volunteer John Schelble helps unload a delivery truck at a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry.

158

Independent Activity Report, West Valley Demonstration Project - July 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project - West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West Valley Demonstration Project [HIAR WVDP-2012-07-30] The purpose of this Office of Health, Safety and Security (HSS) activity was for the HS-45 Site Lead to meet with Department of Energy (DOE) site personnel, tour the facilities, and obtain a status report on the upcoming activities at the West Valley Demonstration Project (WVDP). In the fall of 2011, a new contractor, CH2M Hill-B&W West Valley (CHBWV), was selected to perform site operations for Phase 1 decommissioning and facility disposition, including the Main Plant Process Building, the Low-Level Waste Treatment Facility, and other facilities.

159

Con Edison Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Con Edison Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable...

2009-09-16T23:59:59.000Z

160

ESB Networks Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the ESB Networks Smart Grid Demonstration Host-Site Project as part of EPRIs five-year Smart Grid demonstration initiative. The EPRI initiative includes core Smart Grid research and a number of large scale Smart Grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER) including demand response, storage, distributed generation, and distributed renewable generation into a virtual power plant to ...

2010-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Exelon Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Exelon Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER) including demand response, storage, distributed generation, and distributed renewable gene...

2010-04-05T23:59:59.000Z

162

Duke Energy Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Duke Energy Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distributed...

2010-07-27T23:59:59.000Z

163

Southern Company Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Southern Company Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distri...

2010-07-27T23:59:59.000Z

164

PNM Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the PNM Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable genera...

2009-09-16T23:59:59.000Z

165

FINAL REPORT: RPSEA PROJECT NO.  

NLE Websites -- All DOE Office Websites (Extended Search)

REPORT: REPORT: RPSEA PROJECT NO. 07121-DW1603D RICE UNIVERSITY Structural Health Monitoring System for Deepwater Risers with Vortex-induced Vibration: Nonlinear Modeling, Blind Identification Fatigue/Damage Estimation and Local Monitoring using Magnetic Flux Leakage by Chaojun Huang A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy Approved, Thesis Committee: Satish Nagarajaiah, Chair Professor of Civil and Environmental Engineering and Mechanical Engineering and Material Science Jamie E. Padgett Assistant Professor of Civil and Environmental Engineering Andrew J. Dick Assistant Professor of Mechanical Engineering and Material Science Houston, Texas June, 2012 ABSTRACT Structural Health Monitoring System for Deepwater Risers with Vortex-induced Vibration: Nonlinear Modeling, Blind Identification Fatigue/Damage

166

Spray casting project final report  

SciTech Connect

Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

Churnetski, S.R.; Thompson, J.E.

1996-08-01T23:59:59.000Z

167

Mercury Control Demonstration Projects Cover Photos: * Top: Limestone Power Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FEBRUARY 2008 6 FEBRUARY 2008 Mercury Control Demonstration Projects Cover Photos: * Top: Limestone Power Plant * Bottom left: AES Greenidge Power Plant * Bottom right: Presque Isle Power Plant A report on three projects conducted under separate cooperative agreements between the U.S. Department of Energy and: * Consol Energy * Pegasus Technologies * We Energies  Mercury Control Demonstration Projects Executive Summary ............................................................................ 4 Background ......................................................................................... 5 Mercury Removal Projects ................................................................ 7 TOXECON(tm) Retrofit For Mercury and Multi-Pollutant Control on Three 90-MW Coal-Fired Boilers ........................................7

168

Hawaiian Electric Company Demand Response Roadmap Project Final...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hawaiian Electric Company Demand Response Roadmap Project Final Report Title Hawaiian Electric Company Demand Response Roadmap Project Final Report Publication Type Report LBNL...

169

National Fuel Cell Electric Vehicle Learning Demonstration Final Report  

NLE Websites -- All DOE Office Websites (Extended Search)

National Fuel Cell Electric National Fuel Cell Electric Vehicle Learning Demonstration Final Report K. Wipke, S. Sprik, J. Kurtz, T. Ramsden, C. Ainscough, and G. Saur Technical Report NREL/TP-5600-54860 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 National Fuel Cell Electric Vehicle Learning Demonstration Final Report K. Wipke, S. Sprik, J. Kurtz, T. Ramsden, C. Ainscough, and G. Saur Prepared under Task No. HT12.8110 Technical Report NREL/TP-5600-54860 July 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

170

Vitrification facility at the West Valley Demonstration Project  

SciTech Connect

This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

DesCamp, V.A.; McMahon, C.L.

1996-07-01T23:59:59.000Z

171

EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16: Kalina Geothermal Demonstration Project, Steamboat 16: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada EA-1116: Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Golden Field Office to partially fund assistance for the construction and operation of a privately owned 6-megawatt geothermal power plant which includes one geothermal production well, one injection well, and ancillary facilities such as on-site access road(s) and interconnected to electric transmission lines to existing geothermal power plants. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD February 22, 1999 EA-1116: Finding of No Significant Impact Kalina Geothermal Demonstration Project, Steamboat Springs, Nevada

172

Sydney 2000 Forecast Demonstration Project: Convective Storm Nowcasting  

Science Conference Proceedings (OSTI)

Five of the nowcasting systems that were available during the Sydney 2000 Forecast Demonstration Project (FDP) were selected for evaluation. These systems, from the United States, the United Kingdom, and Australia, had the capability to nowcast ...

James W. Wilson; Elizabeth E. Ebert; Thomas R. Saxen; Rita D. Roberts; Cynthia K. Mueller; Michael Sleigh; Clive E. Pierce; Alan Seed

2004-02-01T23:59:59.000Z

173

West Valley Demonstration Project Waste Incidental to Reprocessing Evaluation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project Waste Incidental to Reprocessing Evaluation for the Concentrator Feed Makeup Tank and the Melter Feed Hold Tank February 2013 Prepared by the U.S. Department of Energy West Valley, New York This page is intentionally blank. WASTE-INCIDENTAL-TO-REPROCESSING EVALUATION FOR THE WVDP CFMT AND MFHT CONTENTS Revision 0 i NOTATION (Acronyms, Abbreviations, and Units).................................................. v 1.0 INTRODUCTION ...................................................................................................... 1 1.1 Purpose. ................................................................................................................. 2

174

The ethanol heavy-duty truck fleet demonstration project  

DOE Green Energy (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

175

Hawaiian Electric Company (HECO) Smart Grid (SG) Demonstration Project Description  

Science Conference Proceedings (OSTI)

This report describes one smart grid demonstration host-site project. The Hawaiian Electric Company (HECO) host site is part of the Electric Power Research Institute's (EPRI's) seven-year Smart Grid Demonstration Initiative. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a "virtual power plant" to advance the widespread, efficient, and cost-effective deployment of ...

2012-08-13T23:59:59.000Z

176

A design for a lighting demonstration module: Final report  

SciTech Connect

The conceptual design for a lighting demonstration unit was developed to support utilities' educational and marketing efforts in lighting. Preceded by a review of the lighting industry's existing demonstration facilities, two meetings were held to focus the project specifically on utility applications. The first, a planning session held in New York City in September 1985 with utility representatives, helped define utility needs and possible ways of meeting those needs through lighting demonstrations. The second, a design session, was held the following month to consider the physical structure of the exhibit and the types of information to be conveyed about lighting. The resulting conceptual design, critiqued by utility representatives, includes multiple modules. The core module is intended to explain and demonstrate the basic principles of lighting. Optional auxiliary modules would focus on specific lighting applications, such as office or home lighting, or on specific lighting system components. 5 figs.

Vincent, R.L.

1989-04-01T23:59:59.000Z

177

DMEC-1 Pressurized Circulating Fluidized-Bed Demonstration Project  

SciTech Connect

The DMEC-1 project will demonstrate the use of Pyropower`s PYROFLOW pressurized circulating fluidized bed technology to repower an existing coal fired generating station. This will be the first commercial application of this technology in the world. The project is now in budget period 1, the preliminary design phase.

Kruempel, G.E.; Ambrose, S.J. [Midwest Power, Des Moines, IA (United States); Provol, S.J. [Pyropower Corp., San Diego, CA (United States)

1992-12-01T23:59:59.000Z

178

Guidebook for Cost/Benefit Analysis of Smart Grid Demonstration Projects  

Science Conference Proceedings (OSTI)

This report presents a step-by-step process for estimating the costs and benefits associated with smart grid demonstration projects. The entire guidebook is meant to function as a stand-alone user’s manual for the analysis process, from the initial step of describing the project to the final step of communicating the results to all stakeholders. This version of the guidebook presents detailed instructions for describing the project objectives, the research plan, and the technologies deployed; ...

2013-12-16T23:59:59.000Z

179

FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT  

SciTech Connect

OAK A271 FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT. The Radiative Divertor Project originated in 1993 when the DIII-D Five Year Plan for the period 1994--1998 was prepared. The Project Information Sheet described the objective of the project as ''to demonstrate dispersal of divertor power by a factor of then with sufficient diagnostics and modeling to extend the results to ITER and TPX''. Key divertor components identified were: (1) Carbon-carbon and graphite armor tiles; (2) The divertor structure providing a gas baffle and cooling; and (3) The divertor cryopumps to pump fuel and impurities.

O'NEIL, RC; STAMBAUGH, RD

2002-06-01T23:59:59.000Z

180

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DEMONSTRATION OF ADVANCED-2013-147 Prepared for: California Energy Commission Prepared by: Electric Power Group, LLC #12;PREPARED BY: Primary: California Energy Commission Jamie Patterson Contract Manager Fernando Pina Office Manager Energy Systems

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

ATTACHMENT O RECENT DEMONSTRATION PROJECTS FUNDED BY THE IAW PROGRAM  

E-Print Network (OSTI)

Generation in Parabolic Trough Solar Collectors This project is to demonstrate on a pilot scale the ability and demonstrate the direct steam generation (DSG) technology in the #12;receiver tube of a line focus parabolic trough collector, first in a single row, and then to simulate operations in multiple rows. From

182

Topic Area 1: Technology Demonstration Projects | Open Energy Information  

Open Energy Info (EERE)

1: Technology Demonstration Projects 1: Technology Demonstration Projects Jump to: navigation, search Geothermal ARRA Funded Projects for Topic Area 1: Technology Demonstration Projects Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

183

DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Begins Demonstrating CCUS Technology in Project Begins Demonstrating CCUS Technology in Alabama DOE-Sponsored Project Begins Demonstrating CCUS Technology in Alabama August 22, 2012 - 1:00pm Addthis Washington, DC - Carbon dioxide (CO2) injection has begun at the world's first fully integrated coal power and geologic storage project in southwest Alabama, with the goals of assessing integration of the technologies involved and laying the foundation for future use of CO2 for enhanced oil recovery (EOR). The "Anthropogenic Test"--conducted by the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven partnerships in DOE's Regional Carbon Sequestration Partnerships program--uses CO2 from a newly constructed post-combustion CO2-capture facility at Alabama Power's 2,657-megawatt Barry Electric Generating Plant (Plant Barry). It will help

184

Low-cost flywheel demonstration program. Final report  

DOE Green Energy (OSTI)

The Applied Physics Laboratory/Department of Energy Low Cost Flywheel Demonstration Program was initiated on 1 October 1977 and was successfully concluded on 31 December 19'9. The total cost of this program was $355,190. All primary objectives were successfully achieved as follows: demonstration of a full-size, 1)kWh flywheel having an estimated cost in large-volume production of approximately $50/kWh; developmeNt of a ball-bearing system having losses comparable to the losses in a totally magnetic suspension system; successful and repeated demonstration of the low-cost flywheel in a complete flywheel energy-storage system based on the use of ordinary house voltage and frequency; and application of the experience gained in the hardware program to project the system design into a complete, full-scale, 30-kWh home-type flywheel energy-storage system.

None

1980-04-01T23:59:59.000Z

185

Technical Services Contract Awarded for West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Services Contract Awarded for West Valley Demonstration Technical Services Contract Awarded for West Valley Demonstration Project Support Services Technical Services Contract Awarded for West Valley Demonstration Project Support Services February 21, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to Safety and Ecology Corporation of Knoxville, Tennessee, for technical services at the West Valley Demonstration Project, West Valley, New York. The task order has a three-year performance period with a $1.3 million value. The task order will be issued from the Indefinite Delivery/Indefinite Quantity (ID/IQ) master contract, firm-fixed-price and time and materials. Under the task order, Safety and Ecology Corporation will perform technical

186

Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project  

DOE Green Energy (OSTI)

The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

2009-11-14T23:59:59.000Z

187

Cape Wind Energy Project - Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Impact Statement for the Proposed Cape Wind Energy Project Nantucket Sound, Offshore of Massachusetts Final Environmental Impact Statement U.S. Department of the Interior, MMS EIS-EA, OCS Publication No. 2008-040, OCS EIS/EA MMS 2010-11 and OCS EIS/EA BOEMRE 2011-024 Adopted as DOE/EIS-0470 U.S. Department of Energy December 2012 Page 1 of 3 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Cape Wind Energy Project, Nantucket Sound, Massachusetts (Adopted), DOE/EIS-0470 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Todd Stribley U.S. Department of Energy Loan Programs Office, LP-10

188

Sundance Energy Project Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS - 0322 DOE/EIS - 0322 Sundance Energy Project Final Environmental Impact Statement Western Area Power Administration June 2001 DOE/EIS - 0322 COVER SHEET Title: Sundance Energy Project, Pinal County, AZ, Final Environmental Impact Statement Lead Agency:U.S. Department of Energy, Western Area Power Administration For information about the Sundance Energy For general information on the DOE EIS Project contact: process, contact: Mr. John Holt, Environmental Manager Ms. Carol Borgstrom, Director Western Area Power Administration NEPA Policy and Assistance, EH-42 Desert Southwest Region U.S. Department of Energy P.O. Box 6457 1000 Independence Avenue, SW Phoenix, AZ 85005-6457 Washington, DC 20585 (602) 352-2592 (202) 586-4600 or (800) 472-2756 Fax: (602) 352-2630 E-mail: holt@wapa.gov

189

Edible Landscape Project: final project report for DOE grant  

SciTech Connect

Edible landscaping is an approach to urban agriculture using yards, rooftops, patios, vacant lots, and greenhouses. Project activities are reviewed, both demonstration and educational. Included is Edible Landscaping in Kansas, a 43 page booklet which includes background information, a case study description of the University For Man demonstration landscape, and encyclopedia of edible plants, and an annotated bibliography. (MHR)

Coates, G.

1984-01-01T23:59:59.000Z

190

Improved recovery demonstration for Williston Basin carbonates. Final report  

SciTech Connect

The purpose of this project was to demonstrate targeted infill and extension drilling opportunities, better determinations of oil-in-place, and methods for improved completion efficiency. The investigations and demonstrations were focussed on Red River and Ratcliffe reservoirs in the Williston Basin within portions of Montana, North Dakota and South Dakota. Both of these formations have been successfully explored with conventional 2-dimensional (2D) seismic. Improved reservoir characterization utilizing 3-dimensional (3D) seismic was investigated for identification of structural and stratigraphic reservoir compartments. These seismic characterizations were integrated with geological and engineering studies. The project tested lateral completion techniques, including high-pressure jetting lance technology and short-radius lateral drilling to enhance completion efficiency. Lateral completions should improve economics for both primary and secondary oil where low permeability is a problem and higher-density drilling of vertical infill wells is limited by drilling cost. New vertical wells were drilled to test bypassed oil in ares that were identified by 3D seismic. These new wells are expected to recover as much or greater oil than was produced by nearby old wells. The project tested water injection through vertical and horizontal wells in reservoirs where application of waterflooding has been limited. A horizontal well was drilled for testing water injection. Injection rates were tested at three times that of a vertical well. This demonstration well shows that water injection with horizontal completions can improve injection rates for economic waterflooding. This report is divided into two sections, part 1 covers the Red River and part 2 covers the Ratcliffe. Each part summarizes integrated reservoir characterizations and outlines methods for targeting by-passed oil reserves in the respective formation and locality.

Sippel, M.A.

1998-07-01T23:59:59.000Z

191

Southern California Edison Company Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Company Smart Grid Demonstration Project (2) Company Smart Grid Demonstration Project (2) Jump to: navigation, search Project Lead Southern California Edison Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $24,978,264.00 Total Project Value $53,510,209.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

192

Public Service Company of New Mexico Smart Grid Demonstration Project |  

Open Energy Info (EERE)

of New Mexico Smart Grid Demonstration Project of New Mexico Smart Grid Demonstration Project Jump to: navigation, search Project Lead Public Service Company of New Mexico Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $1,755,931.00 Total Project Value $5,851,303.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

193

Waukesha Electric Systems Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Electric Systems Smart Grid Demonstration Project Electric Systems Smart Grid Demonstration Project Jump to: navigation, search Project Lead Waukesha Electric Systems Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $10,744,409.00 Total Project Value $21,548,821.00 Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

194

Long Island Power Authority Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Long Island Power Authority Country United States Headquarters Location Uniondale, New York Recovery Act Funding $12,496,047.00 Total Project Value $25,293,735.00 Coordinates 40.7003793°, -73.5929056° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

195

City of Painesville Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Painesville Smart Grid Demonstration Project Painesville Smart Grid Demonstration Project Jump to: navigation, search Project Lead City of Painesville Country United States Headquarters Location Painesville, Ohio Recovery Act Funding $3,743,570.00 Total Project Value $7,487,153.00 Coordinates 41.7244885°, -81.245657° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

196

Primus Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Demonstration Project Smart Grid Demonstration Project Jump to: navigation, search Project Lead Primus Power Corporation Country United States Headquarters Location Alameda, California Recovery Act Funding $14,000,000.00 Total Project Value $46,700,000.00 Coordinates 37.7652065°, -122.2416355° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

197

Duke Energy Business Services, LLC Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Demonstration Project Demonstration Project Jump to: navigation, search Project Lead Duke Energy Business Services, LLC Country United States Headquarters Location Charlotte, North Carolina Recovery Act Funding $21,806,232.00 Total Project Value $43,612,464.00 Coordinates 35.2270869°, -80.8431267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

198

Seeo, Inc Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Seeo, Inc Smart Grid Demonstration Project Seeo, Inc Smart Grid Demonstration Project Jump to: navigation, search Project Lead Seeo, Inc Country United States Headquarters Location Berkeley, California Recovery Act Funding $6,196,060.00 Total Project Value $12,392,120.00 Coordinates 37.8715926°, -122.272747° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

199

Ktech Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Ktech Corporation Smart Grid Demonstration Project Ktech Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Ktech Corporation Country United States Headquarters Location Albuquerque, New Mexico Recovery Act Funding $4,764,284.00 Total Project Value $9,528,567.00 Coordinates 35.0844909°, -106.6511367° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

200

Premium Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Corporation Smart Grid Demonstration Project Corporation Smart Grid Demonstration Project Jump to: navigation, search Project Lead Premium Power Corporation Country United States Headquarters Location North Reading, Massachusetts Recovery Act Funding $7,320,000.00 Total Project Value $16,080,554.00 Coordinates 42.5750939°, -71.0786653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Amber Kinetics, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Kinetics, Inc. Smart Grid Demonstration Project Kinetics, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Amber Kinetics, Inc. Country United States Headquarters Location Fremont, California Recovery Act Funding $4,000,000.00 Total Project Value $10,000,000.00 Coordinates 37.5482697°, -121.9885719° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

202

The Boeing Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Boeing Company Smart Grid Demonstration Project The Boeing Company Smart Grid Demonstration Project Jump to: navigation, search Project Lead The Boeing Company Country United States Headquarters Location St. Louis, Missouri Recovery Act Funding $8,561,396.00 Total Project Value $17,172,844.00 Coordinates 38.646991°, -90.224967° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

203

44 Tech Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

Inc. Smart Grid Demonstration Project Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead 44 Tech Inc. Country United States Headquarters Location Pittsburgh, Pennsylvania Recovery Act Funding $5,000,000.00 Total Project Value $10,000,000.00 Coordinates 40.4406248°, -79.9958864° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

204

Oncor Electric Delivery Company, LLC Smart Grid Demonstration Project |  

Open Energy Info (EERE)

Company, LLC Smart Grid Demonstration Project Company, LLC Smart Grid Demonstration Project Jump to: navigation, search Project Lead Oncor Electric Delivery Company, LLC Country United States Headquarters Location Dallas, Texas Recovery Act Funding $3,471,681.00 Total Project Value $7,279,166.00 Coordinates 32.802955°, -96.769923° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

205

West Valley Demonstration Project 10282 Rock Springs Road  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 Mr. Daniel W. Coyne President & General Manager CH2M HILL B&W West Valley, LLC West Valley Demonstration Project 10282 Rock Springs Road West Valley, NY 141 71 -9799 ATTENTION: J. D. Rendall, Regulatory Strategy, AC-EA SUBJECT: Environmental Checklist WVDP-20 12-0 1, " WVDP Reservoir Interconnecting Canal Maintenance Activities" REFERENCE: Letter WD:2012:0409 (357953), D. W. Coyne to R. W. Reffner, "CONTRACT NO. DE-EM000 1529, Section 5-3, Item 105, NEPA Documentation (Transmittal of Environmental Checklist WVDP-20 12-0 1, WVDP Reservoir Interconnecting Canal Maintenance Activities), Revision 1 ," dated July 24, 20 12 Dear Mr. Coyne:

206

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Demonstrates Benefits of Constructed Wetlands Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources March 10, 2009 - 1:00pm Addthis Washington, DC -- In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers have shown that manmade or "constructed" wetlands can be used to treat non-traditional water sources which could then be used in power plants or for other purposes. The successful test, which was managed by DOE's National Energy Technology Laboratory (NETL), could help power plants economically meet criteria for water reuse or discharge established by the National Pollution Discharge Elimination System and the Clean Water Act.

207

Integrated monitoring and surveillance system demonstration project: Phase I accomplishments  

Science Conference Proceedings (OSTI)

The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

Aumeier, S.E.; Walters, B.G.; Crawford, D.C. [and others

1997-01-15T23:59:59.000Z

208

King County Carbonate Fuel Cell Demonstration Project: 2005 Update  

Science Conference Proceedings (OSTI)

This case study documents the ongoing demonstration experiences of a 1-MW carbonate fuel cell system operating on anaerobic digester gas at a wastewater treatment plant in King County, Washington. This is a follow-up to a previous EPRI report on the same project, 1011472, and summarizes operational experience and performance data obtained in 2005. The case study is one of several fuel cell project case studies under research by the EPRI Distributed Energy Resources Program. This case study is designed to...

2006-03-07T23:59:59.000Z

209

US Recovery Act Smart Grid Energy Storage Demonstration Projects | Open  

Open Energy Info (EERE)

Storage Demonstration Projects Storage Demonstration Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

210

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop: Workshop: Compressed Natural Gas and Hydrogen Fuels: Lessons Learned for the Safe Deployment of Vehicles December 11, 2009 John Garbak, Todd Ramsden Keith Wipke, Sam Sprik, Jennifer Kurtz Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project National Renewable Energy Laboratory 2 Innovation for Our Energy Future Fuel Cell Vehicle Learning Demonstration Project Objectives and Targets * Objectives - Validate H 2 FC Vehicles and Infrastructure in Parallel - Identify Current Status and Evolution of the Technology - Objectively Assess Progress Toward Technology Readiness - Provide Feedback to H 2 Research and Development Photo: NREL Solar Electrolysis Station, Sacramento, CA Performance Measure

211

Silo 3 Vacuum Wand Demonstration Test Final Report  

Science Conference Proceedings (OSTI)

Silo 3, a freestanding, pre-stressed concrete, domed cylindrical tank, located at the Fernald Closure Project near Cincinnati, Ohio, contains approximately 5,100 cubic yards of metal oxide waste generated from Fernald operations that extracted uranium from ore material. The baseline for the Silo 3 Project is to remove a portion of this material from the silo pneumatically by inserting vacuum retrieval wands and/or hoses in existing manways on the silo dome. After the loose material has been removed by the pneumatic system, the project intends to cut an opening in the silo wall and use a mechanical excavator to complete removal of the remaining material, including possible combination with pneumatic retrieval. Fluor Fernald previously requested that the Department of Energy Environmental Management Office of Science and Technology provide a Technical Assistance Team to review this approach. One of the key recommendations made by this team was to assess the wand operability, effectiveness, reliability, and safety in a mock-up test. A team was convened to develop the test plan, build the demonstration test loop, and perform the tests. The tests focused primarily on the operability of the system, and to a significantly lesser extent process performance. This report documents the results for the testing completed in April 2003. Based upon the testing performed, the team identified several key issues to be incorporated into the design and operation of the retrieval system.

Steve Birrer

2003-06-01T23:59:59.000Z

212

Wind electric generator project. Final report  

Science Conference Proceedings (OSTI)

The wind generator is installed and connected at Iowa Western Community College. It is heating water through four hot water tanks and has proven to be an excellent demonstration project for the community. The college gets frequent inquiries about the wind mill and has been very cooperative in informing the public about the success. The windmill generates more electricity than is needed to heat four hot water heaters and future plans are to hook up more. The project requires very little maintenance. Attached is a date sheet on the project.

Not Available

1983-09-23T23:59:59.000Z

213

West Valley Demonstration Project Transportation Emergency Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS ......................................................................................... 7 Hazards Survey and Hazards Assessment .................................... 7 Program Plans and Procedures ..................................................... 8 Emergency Responder Performance .......................................... 10 Feedback and Continuous Improvement....................................

214

Elevated Silica Project at Palisades -- Final Report  

Science Conference Proceedings (OSTI)

Silica concentrations as high as 2-5 ppm in the primary water during startup at some pressurized water reactor (PWR) plants exceed the prevailing industry diagnostic limit of 1 ppm and raise concerns about the possible formation of tenacious silicate deposits on the fuel. To minimize the costs of removing excess silica at fuel outages, EPRI initiated an investigation on the effect of silica on fuel performance. This report documents the final stage of this research, a fuel surveillance project at Palisad...

2000-10-27T23:59:59.000Z

215

Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project  

DOE Green Energy (OSTI)

Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

1980-05-01T23:59:59.000Z

216

Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project  

DOE Green Energy (OSTI)

Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

1980-05-01T23:59:59.000Z

217

Guidebook for Cost/Benefit Analysis of Smart Grid Demonstration Projects  

Science Conference Proceedings (OSTI)

This report presents a step-by-step process for estimating the costs and benefits associated with Smart Grid demonstration projects. In its entirety, the guidebook is meant to function as a standalone user’s manual for the analysis process, from the initial step of describing the project to the final step of communicating the results to all stakeholders. This revision of the Guidebook updates and supersedes the material in the original Volume 1, published in 2011, but goes further by adding ...

2012-12-12T23:59:59.000Z

218

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Project Overview and Fall 2006 Results (Presentation)  

DOE Green Energy (OSTI)

This presentation on NREL's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project was given by Keith Wipke at the ZEV Technology Symposium on September 15, 2006.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.; Hooker, D.

2006-09-01T23:59:59.000Z

219

West Valley Demonstration Project Administrative Consent Order, August 27, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________| Table of Contents Parties Jurisdiction Purpose and Scope Statement of Facts & Conclusions of Law I. Implementation of the STP II Annual Updates III. Establishing Milestones and Planning Schedule Activity IV. Covered Matters V. Inclusion of New Waste Streams VI. Amendments VII. Project Managers

220

PROJECT MANGEMENT PLAN EXAMPLES Project Closeout - Final Report Example  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Report Example Final Report Example Example 79 4.6.2.2.4.2 Closeout Reports Completion documentation will be compiled for each of the identified worksets. A final Closeout Report will be prepared for the 771/774 Closure Project when work is completed and the analytical data has been received. The report will consist of a brief description of the work that was completed, including any modifications or variations from the original decision document. The report will also include analytical results, including the results of any confirmatory sampling taken to verify completion of the action to the specific performance standards. A discussion of the quantity and characteristics of the actual wastes produced and how the wastes were stored or disposed will also be provided.

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Puerto Rico time-of-day rates demonstration. Final report  

SciTech Connect

The Puerto Rico Time of Day (TOD) electric rate demonstration project consists of three distinct studies: (A) Low usage customers (less than or equal to425 kWh per 30 consecutive days) are compared for a 12 hours peak period rate, against a control group of similar usage. (B) High usage customers (>425 kWh per 30 consecutive days) are assigned a single 12 hours peak period experimental rate. (C) High usage customers, assigned to a number of different experimental rates and compared against a control group (also used for B). For this group, peak period lengths are fixed at a specific six hour period and rates are allowed to vary. For comparative purposes a control group is included. As part of this experiment an entry and exit survey have been designed. The purpose of the surveys is to find out the changes in electric consumption stock and life style of the participants from the start to the end of the project. As participants were assigned to rates or control groups on a random basis, the emphasis of the entry survey analysis is to determine if there are any significant statistical differences among the selected participants.

1985-01-01T23:59:59.000Z

222

Smart Gun Technology project. Final report  

Science Conference Proceedings (OSTI)

The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

Weiss, D.R.

1996-05-01T23:59:59.000Z

223

Solar Two: A successful power tower demonstration project  

DOE Green Energy (OSTI)

Solar Two, a 10MWe power tower plant in Barstow, California, successfully demonstrated the production of grid electricity at utility-scale with a molten-salt solar power tower. This paper provides an overview of the project, from inception in 1993 to closure in the spring of 1999. Included are discussions of the goals of the Solar Two consortium, the planned-vs.-actual timeline, plant performance, problems encountered, and highlights and successes of the project. The paper concludes with a number of key results of the Solar Two test and evaluation program.

REILLY,HUGH E.; PACHECO,JAMES E.

2000-03-02T23:59:59.000Z

224

Alaska village demonstration projects. Report to the Congress  

SciTech Connect

The Alaska Village Demonstration Projects (AVDP) were authorized by Section 113, P.L. 92-500 (86 STAT 816), for the purpose of demonstrating methods to improve sanitary conditions in native villages of Alaska. Central community facilities have been constructed in the native villages of Emmonak and Wainwright to provide a safe water supply; toilets, bathing, and laundry facilities; and sewage and solid waste disposal. Although there has not been enough time to allow full operation and evaluation of these facilities, it is apparent that the technology is available to provide these basic utility services to the demonstration villages. A major issue still to be addressed is the lack of clear responsibility for the operation and maintenance of the facilities after the Environmental Protection Agency demonstration program is completed. Adequate local resources to operate the installations are lacking. Continued experience with the AVDP is needed to complete evaluation and develop recommendations in relation to the establishment of a statewide program.

1973-07-01T23:59:59.000Z

225

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

226

Shawmut hydroelectric redevelopment project. Final technical and construction cost report  

DOE Green Energy (OSTI)

This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

None

1982-08-01T23:59:59.000Z

227

FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

This project has two primary purposes: (1) Build a small-footprint (SFP) fuel production plant to prove the feasibility of this relatively transportable technology on an intermediate scale (i.e. between laboratory-bench and commercial capacity) and produce as much as 150,000 gallons of hydrogen-saturated Fischer-Tropsch (FT) diesel fuel; and (2) Use the virtually sulfur-free fuel produced to demonstrate (over a period of at least six months) that it can not only be used in existing diesel engines, but that it also can enable significantly increased effectiveness and life of the next-generation exhaust-after-treatment emission control systems that are currently under development and that will be required for future diesel engines. Furthermore, a well-to-wheels economic analysis will be performed to characterize the overall costs and benefits that would be associated with the actual commercial production, distribution and use of such FT diesel fuel made by the process under consideration, from the currently underutilized (or entirely un-used) energy resources targeted, primarily natural gas that is stranded, sub-quality, off-shore, etc. During the first year of the project, which is the subject of this report, there have been two significant areas of progress: (1) Most of the preparatory work required to build the SFP fuel-production plant has been completed, and (2) Relationships have been established, and necessary project coordination has been started, with the half dozen project-partner organizations that will have a role in the fuel demonstration and evaluation phase of the project. Additional project tasks directly related to the State of Alaska have also been added to the project. These include: A study of underutilized potential Alaska energy resources that could contribute to domestic diesel and distillate fuel production by providing input energy for future commercial-size SFP fuel production plants; Demonstration of the use of the product fuel in a heavy-duty diesel vehicle during the Alaska winter; a comparative study of the cold-starting characteristics of FT and conventional diesel fuel; and demonstration of the use of the fuel to generate electricity for rural Alaskan villages using both a diesel generator set, and a reformer-equipped fuel cell.

Stephen P. Bergin

2003-04-23T23:59:59.000Z

228

NETL: News Release - DOE-Supported Project Demonstrates Benefits of  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources DOE-Supported Project Demonstrates Benefits of Constructed Wetlands to Treat Non-Traditional Water Sources Flue gas desulfurization water was treated in a constructed wetlands system consisting of five reactors planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Flue gas desulfurization water was treated in a constructed wetlands system consisting of five "reactors" planted with vegetation found in natural wetlands. The water to be treated was received from an operating coal-fired power plant in the south-eastern United States. Washington, DC - In a pilot-scale test supported by the U.S. Department of Energy (DOE) Office of Fossil Energy, Clemson University researchers

229

West Valley Demonstration Project High-Level Waste Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT_19507_1 DRAFT_19507_1 High-Level Waste Management Bryan Bower, DOE Director - WVDP DOE High-Level Waste Corporate Board Meeting Savannah River Site April 1, 2008 West Valley Demonstration Project West Valley Demonstration Project DRAFT_19507_2 West Valley High-Level Waste To solidify the radioactive material from approximately 600,000 gallons of high-level radioactive waste into a durable, high-quality glass, both a pretreatment system to remove salts and sulfates from the waste and a vitrification system/process were designed. To solidify the radioactive material from approximately 600,000 gallons of high-level radioactive waste into a durable, high-quality glass, both a pretreatment system to remove salts and sulfates from the waste and a vitrification system/process were designed.

230

300kW Energy Storage Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kW Energy Storage Demonstration kW Energy Storage Demonstration Project Technical Overview Presented at: Annual Doe Peer Review Meeting ─ 2008 DOE Energy Storage & Power Electronics Research Programs By Ib I. Olsen September 29, 2008 116 John Street - Suite 2320 New York, New York 10038 (p) 1.212.732.5507 (f) 1.212.732.5597 www.gaiapowertech.com This project is part of the Joint Energy Storage Initiative between the New York State Energy Research and Development Authority (NYSERDA) and the Energy Storage Systems Program of the U.S. Department of Energy (DOE/ESS), and managed by Sandia National Laboratories (SNL). Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration, under contract DE-AC04-94AL85000

231

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report  

Science Conference Proceedings (OSTI)

The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

Not Available

1992-02-01T23:59:59.000Z

232

Duke Energy Notrees Wind Storage Demonstration Project: 2013 Interim Report  

Science Conference Proceedings (OSTI)

This Electric Power Research Institute (EPRI) technical update is an interim report summarizing the status of Duke Energy’s Notrees Wind Storage Demonstration Project, which involves integrating a 36-MW battery energy storage system (BESS) from Xtreme Power with the152.6-MW Notrees Wind Farm. Xtreme Power’s solid lead-acid battery represents one of an emerging number of energy storage devices endowed with the potential to serve multiple value-added utility applications. ...

2013-12-19T23:59:59.000Z

233

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

DOE Green Energy (OSTI)

General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

Stottler, Gary

2012-02-08T23:59:59.000Z

234

Distributed Energy Resources Integration in the Smart Grid Demonstration Project  

Science Conference Proceedings (OSTI)

In an effort to answer some of the basic system architecture questions posed by members, EPRI undertook a survey to find, among members that have smart grid demonstration projects, what the basic system architecture strategy was and basic concerns that may have architectural implications for their Distributed Energy Resource (DER) deployments. To that end, a longitudinal survey was designed to determine the basic demographics of the community, e.g. number of DER devices being deployed, the basic ...

2012-11-14T23:59:59.000Z

235

RESEM-CA Final Project Report  

SciTech Connect

This document is the final deliverable for Project 2.2-Retrofit Tools, in the California Energy Commission Public Interest Energy Research Program for High Performance Commercial Building Systems (PIER-HPCBS). The objective of Project 2.2 is to deliver an updated and California-Customized retrofit analysis tool based on the earlier federally funded RESEM (Retrofit Energy Savings Estimation Method) tool [1]. Specific tasks to accomplish this were identified in PIER HPCBS Report No. E2P2.2T1c, and addressed (a) modernization, (b) enhancement of basic analysis methods and capabilities, (c) adding, modifying, or updating databases for California building types, systems, components, utility rate structures, and weather.

Carroll, William

2004-06-01T23:59:59.000Z

236

Field demonstrations of communication systems for distribution automation. Final report  

Science Conference Proceedings (OSTI)

This report summarizes the results of a field demonstration of the use of UHF radio links in the 950-MHz portion of the spectrum as a communication medium for performing automated electric power distribution. Prototype radiohardware was combined with logic and control equipment developed by Westinghouse for power-line carrier automated distribution systems. Transceivers were used in the remote interactive terminals. 3dbm transceivers were used in the Central Base Station and the three Primary Radio Terminals, which functioned as system repeaters. Pre-installation field-strength measurements were made along selected radials and in spot locations to characterize the anticipated field-strength contours that would be encountered during the operational testing. A propagation model was developed that accurately predicted the conditions actually recorded. Post-installation measurements were used to further calibrate the computer model. The resulting propagation analysis proved exceedingly effective in characterizing a UHF radio system for digital communication. Data collected during a 10-month operational period supports the conclusion that 950-MHz radio is a viable communications medium for performing utility automated distribution functions. The system consists of 250 remote terminals, each interrogated from three sites. This provides 750 paths for communication performance evaluation.The reliability of the prototype radio units used in this project fell below that predicted through MTBF analysis, and did not meet utility reliability standards. The logic and control circuitry and central station required very little maintenance during the test.

Not Available

1981-06-01T23:59:59.000Z

237

Intergovernmental Advanced Stationary PEM Fuel Cell System Demonstration Final Report  

DOE Green Energy (OSTI)

A program to complete the design, construction and demonstration of a PEMFC system fuelled by Ethanol, LPG or NG for telecom applications was initiated in October 2007. Early in the program the economics for Ethanol were shown to be unfeasible and permission was given by DOE to focus on LPG only. The design and construction of a prototype unit was completed in Jun 2009 using commercially available PEM FC stack from Ballard Power Systems. During the course of testing, the high pressure drop of the stack was shown to be problematic in terms of control and stability of the reformer. Also, due to the power requirements for air compression the overall efficiency of the system was shown to be lower than a similar system using internally developed low pressure drop FC stack. In Q3 2009, the decision was made to change to the Plug power stack and a second prototype was built and tested. Overall net efficiency was shown to be 31.5% at 3 kW output. Total output of the system is 6 kW. Using the new stack hardware, material cost reduction of 63% was achieved over the previous Alpha design. During a November 2009 review meeting Plug Power proposed and was granted permission, to demonstrate the new, commercial version of Plug Power's telecom system at CERL. As this product was also being tested as part of a DOE Topic 7A program, this part of the program was transferred to the Topic 7A program. In Q32008, the scope of work of this program was expanded to include a National Grid demonstration project of a micro-CHP system using hightemperature PEM technology. The Gensys Blue system was cleared for unattended operation, grid connection, and power generation in Aug 2009 at Union College in NY state. The system continues to operate providing power and heat to Beuth House. The system is being continually evaluated and improvements to hardware and controls will be implemented as more is learned about the system's operation. The program is instrumental in improving the efficiency and reducing costs of PEMFC based power systems using LPG fuel and continues to makes steps towards meeting DOE's targets. Plug Power would like to thank DOE for their support of this program.

Rich Chartrand

2011-08-31T23:59:59.000Z

238

Automated Demand Response Technology Demonstration Project for Small and  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Demonstration Project for Small and Technology Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings Publication Type Report LBNL Report Number LBNL-4982E Year of Publication 2011 Authors Page, Janie, Sila Kiliccote, Junqiao Han Dudley, Mary Ann Piette, Albert K. Chiu, Bashar Kellow, Edward Koch, and Paul Lipkin Date Published 07/2011 Publisher CEC/LBNL Keywords demand response, emerging technologies, market sectors, medium commercial business, openadr, small commercial, small commercial business, technologies Abstract Small and medium commercial customers in California make up about 20-25% of electric peak load in California. With the roll out of smart meters to this customer group, which enable granular measurement of electricity consumption, the investor-owned utilities will offer dynamic prices as default tariffs by the end of 2011. Pacific Gas and Electric Company, which successfully deployed Automated Demand Response (AutoDR) Programs to its large commercial and industrial customers, started investigating the same infrastructures application to the small and medium commercial customers. This project aims to identify available technologies suitable for automating demand response for small-medium commercial buildings; to validate the extent to which that technology does what it claims to be able to do; and determine the extent to which customers find the technology useful for DR purpose. Ten sites, enabled by eight vendors, participated in at least four test AutoDR events per site in the summer of 2010. The results showed that while existing technology can reliably receive OpenADR signals and translate them into pre-programmed response strategies, it is likely that better levels of load sheds could be obtained than what is reported here if better understanding of the building systems were developed and the DR response strategies had been carefully designed and optimized for each site.

239

Environmental Assessment for the Decontamination, Demolition, and Removal of Certain Facilities at the West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52 52 Environmental Assessment for the Decontamination, Demolition, and Removal of Certain Facilities at the West Valley Demonstration Project Final U.S. Department of Energy West Valley Demonstration Project West Valley, New York September 14, 2006 Final EA - Decontamination, Demolition, and Removal of Certain Facilities at WVDP i Table of Contents CHAPTER 1 INTRODUCTION AND PURPOSE AND NEED FOR AGENCY ACTION................ 1 1.1 Overview....................................................................................................................... 1 1.2 West Valley Demonstration Project.............................................................................. 2 1.3 Purpose and Need for Agency Action ..........................................................................

240

Research and development of a 3 MW power plant from the design, development, and demonstration of a 100 KW power system utilizing the direct contact heat exchanger concept for geothermal brine recovery project. Final report  

DOE Green Energy (OSTI)

The design phase for the 100 KW unit consumed the months of May through November 1978, with the final design selected as having a direct contact boiler and condenser, a single-stage radial inflow induction turbine-generator using isopentane as the working fluid, and a single cell ejector-type cooling tower. The unit was constructed on two, forty-foot flatbed trailers between the months of October 1978 and June 1979. Systems start-up testing, in-field modifications, unit operation, and performance testing were performed between July and December 1979. AP and L (Arkansas Power and Light) personnel assumed responsibility of the unit at that time and conducted further maintenance, operations, and testing through August 1980.

Huebner, A.W.; Wall, D.A.; Herlacher, T.L.

1980-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Northeast Oregon Hatchery Project, Final Siting Report.  

DOE Green Energy (OSTI)

This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

Watson, Montgomery

1995-03-01T23:59:59.000Z

242

FUTUREGEN PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT  

E-Print Network (OSTI)

This chapter provides information regarding the affected environment and the potential for impacts on each resource area in relation to construction and operation of the FutureGen Project at the proposed Mattoon Site. To aid the reader and to properly address the complexity of the FutureGen Project, as well as the need to evaluate four sites (two in Illinois and two in Texas), this Environmental Impact Statement (EIS) was prepared as two separate volumes. Volume I of the EIS includes the purpose and need for the agency action, a description of the Proposed Action and Alternatives, and a summary of the potential environmental consequences. Volume II addresses the affected environment and potential impacts for each of the four proposed alternative sites. Presenting the affected environment immediately followed by the potential impacts on each resource area allows the reader to more easily understand the relationship between current site conditions and potential project impacts on a particular resource. The Best and Final Offer (BAFO) information for the Mattoon site and its potential impacts have been addressed in Sections S.4.3 and 2.4.5, and Table S-1, S-12 and 3-3, and therefore are not reflected in the text of this section. Volume II is organized by separate chapters for each proposed site: Chapter 4-Mattoon, Illinois;

unknown authors

2007-01-01T23:59:59.000Z

243

Manzanita Hybrid Power system Project Final Report  

DOE Green Energy (OSTI)

The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

Trisha Frank

2005-03-31T23:59:59.000Z

244

York County Energy Partners DOE CCI ACFB demonstration project  

Science Conference Proceedings (OSTI)

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world`s largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy`s Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. [Air Products and Chemicals, Inc., Allentown, PA (United States); Cox, J.; Parham, D. [Foster Wheeler Energy Corp., Clinton, NJ (United States)

1992-09-01T23:59:59.000Z

245

York County Energy Partners DOE CCI ACFB demonstration project  

Science Conference Proceedings (OSTI)

The York County Energy Partners (YCEP) project, to be located in York County, Pennsylvania, will demonstrate the world's largest atmospheric circulating fluidized bed boiler under sponsorship of the US Department of Energy's Clean Coal Technology I Program. The single ACFB boiler, designed by Foster Wheeler Energy Corporation, will produce 227 MWe of net electrical power and export approximately 50,000 lb/hr of steam. This paper explains how the technical challenges to the design of a utility-scale ACFB boiler were met and presents the innovative features of this design.

Wang, S. (Air Products and Chemicals, Inc., Allentown, PA (United States)); Cox, J.; Parham, D. (Foster Wheeler Energy Corp., Clinton, NJ (United States))

1992-01-01T23:59:59.000Z

246

MHK Projects/MORILD Demonstration Plant | Open Energy Information  

Open Energy Info (EERE)

MORILD Demonstration Plant MORILD Demonstration Plant < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":69.8079,"lon":18.6795,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

247

MHK Projects/Race Rocks Demonstration | Open Energy Information  

Open Energy Info (EERE)

Race Rocks Demonstration Race Rocks Demonstration < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.2844,"lon":-123.531,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

248

LIMB Demonstraton Project Extension and Coolside Demonstration: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 LIMB Demonstration Project Extension and Coolside Demonstration: A DOE Assessment April 2000 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial

249

Griffith Energy Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

N /A

1999-04-02T23:59:59.000Z

250

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project DOE Manual 435.1-1 Waste Incidental to Reprocessing Evaluations and Determinations West Valley Demonstration Project DOE Manual 435.1-1 Waste...

251

The LiveWire Project final report  

SciTech Connect

Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

Brown, C.D.; Nelson, T.T. [Enova Technology, San Diego, CA (United States); Kelly, J.C.; Dominguez, H.A. [Paragon Consulting Services, La Verne, CA (United States)

1997-10-01T23:59:59.000Z

252

National Fuel Cell Electric Vehicle Learning Demonstration Final...  

NLE Websites -- All DOE Office Websites (Extended Search)

national daily average miles traveled. An effective 40-mile electric range would allow electrification of more than two-thirds of the Learning Demonstration vehicle miles and...

253

Fuel Cell Forklift Project Final Report  

SciTech Connect

This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

Cummings, Clifton C

2013-10-23T23:59:59.000Z

254

Northwest Open Automated Demand Response Technology Demonstration Project  

SciTech Connect

The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides ancillary services within its own balancing authority. The relationship between BPA and SCL creates a unique opportunity to create DR programs that address both BPA's and SCL's markets simultaneously. Although simultaneously addressing both market could significantly increase the value of DR programs for BPA, SCL, and the end user, establishing program parameters that maximize this value is challenging because of complex contractual arrangements and the absence of a central Independent System Operator or Regional Transmission Organization in the northwest.

Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

2010-03-17T23:59:59.000Z

255

Energy Storage and Distributed Energy Generation Project, Final Project Report  

Science Conference Proceedings (OSTI)

This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

2008-03-31T23:59:59.000Z

256

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

SciTech Connect

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

1976-04-01T23:59:59.000Z

257

Geothermal project summaries. Geothermal energy research, development, and demonstration program  

DOE Green Energy (OSTI)

The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

Not Available

1976-04-01T23:59:59.000Z

258

West Valley Demonstration Project Waste Management Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE-WEST VALLEY AREA OFFICE P.O. BOX 191 WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Draft West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Daniel W. Sullivan Document Manager DOE-West Valley Area Office

259

West Valley Demonstration Project Waste Management Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY April 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE P.O. BOX 191 WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Draft West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Daniel W. Sullivan Document Manager DOE West Valley Area Office

260

LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

41 41 LIFAC Sorbent Injection Desulfurization Demonstration Project: A DOE Assessment January 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov Disclaimer 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Advanced Flue Gas Desulfurization (AFGD) Demonstration Project A DOE Assessment August 2001 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 website: www.netl.doe.gov 2 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference

262

Uranium soils integrated demonstration: Soil characterization project report  

Science Conference Proceedings (OSTI)

An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

Cunnane, J.C. [Argonne National Lab., IL (United States); Gill, V.R. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Lee, S.Y. [Oak Ridge National Lab., TN (United States); Morris, D.E. [Los Alamos National Lab., NM (United States); Nickelson, M.D. [HAZWRAP, Oak Ridge, TN (United States); Perry, D.L. [Lawrence Berkeley Lab., CA (United States); Tidwell, V.C. [Sandia National Labs., Albuquerque, NM (United States)

1993-08-01T23:59:59.000Z

263

Electric G-Van demonstration and commercial assessment project  

DOE Green Energy (OSTI)

The Electric Power Research Institute was awarded this grant to continue the joint effort initiated by EPRI, and VE International to proceed beyond the prototype phase of the electric G-Van development. The goal of EPRI and VEHMA was to develop a market for the electric G-Van, and to distribute them to commercial fleet operators. The objective of this project was to produce G-Vans in a production facility that would be comparable to the GMC Truck internal combustion engine Vandura Van produced by General Motors in quality, reliability, durability and safety. An initial market assessment/demonstration phase of sixty (60) vehicles was to be undertaken, with the ability to expand production volume quickly to meet market demands. Brief description of each task of this grant is given and the actions taken by EPRI to complete them.

Braga, B.D. (Electric Power Research Inst., Palo Alto, CA (United States))

1992-12-01T23:59:59.000Z

264

Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.  

SciTech Connect

The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

Barnett, Cole; Thor, Philip W.

1990-06-01T23:59:59.000Z

265

Final Report: Fan Filter Unit Project  

NLE Websites -- All DOE Office Websites (Extended Search)

61684 61684 Demonstration of Advanced Filtration Technologies: Developing Energy-rebate Criteria through Performing Standard Laboratory Tests and Statistical Analyses Final Report (LBNL- 61684) To California Energy Commission 2007 Tengfang Xu and Duo Wang 2 Disclaimer This document was prepared as an account of work sponsored by the United States Government and California Energy Commission. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor California Energy Commission, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

266

New Mexico State University Campus geothermal demonstration project  

DOE Green Energy (OSTI)

This report presents the design, construction highlights, and performance of the New Mexico State University Campus Geothermal Demonstration Project at Las Cruces, New Mexico. Construction started in July 1981, first system use was January 1982, and the system was dedicated on April 21, 1982. Included herein are summary observations after two years of use. The geothermal hot water from New Mexico State University wells is used to heat potable water, which in turn provides 83 percent of the domestic hot water on the New Mexico State University campus, as well as space heat to two buildings, and for two heated swimming pools. The original system is providing service to 30 total buildings, with two additional buildings (150,000 square feet) in process of geothermal conversion.) The system overall performance has been excellent, except for geothermal well pump problems. In terms of operating efficiency, the system has exceeded the design parameters. In spite of abnormally high costs for well and pump repairs, the system has shown a positive cost avoidance of more than $118,000 for the first year of operation. For the first two full years of operation, the system has produced a net positive cost avoidance of more than $200,000. Payback on the total investment of $1,670,000 is projected to be 6 to 10 years, depending on the future prices of natural gas and electricity.

Cuniff, R.A.; Fisher, K.P.; Chintawongvanich, P.

1984-04-01T23:59:59.000Z

267

Locomotive Emission and Engine Idle Reduction Technology Demonstration Project  

DOE Green Energy (OSTI)

In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units demonstrated an IME of 64% at stationary idle for the test period. The data collected during calendar year 2004 demonstrated that 707,600 gallons of fuel were saved and 285 tons of NOX were not emitted as a result of idle management in stationary idle, which translates to 12,636 gallons and 5.1 tons of NOx per unit respectively. The noise reduction capabilities of the APU demonstrated that at 150 feet from the locomotive the loaded APU with the main engine shut down generated noise that was only marginally above ambient noise level.

John R. Archer

2005-03-14T23:59:59.000Z

268

Use of alcohol fuel: engine-conversion demonstration. Final report  

DOE Green Energy (OSTI)

The use of ethanol as a fuel extender when mixed with gasoline, and the use of both hydrated and anhydrous ethanol as a fuel in gasoline and diesel engines are discussed. Required engine modifications for efficient use of ethanol are described, and include engine compression alterations, carburetor adjustments, and arrangement for fuel preheating. In 1981 and 1982 a demonstration of ethanol use in spark ignition engines was conducted at a major public park in South Carolina. The demonstration included a controlled road test with a pick-up truck and a demonstration of ethanol use in small, air cooled gasoline engines. One problem that was identified was that of contaminated fuel that clogged the fuel system after a few days' operation. (LEW)

Marsh, W.K. (ed.)

1982-01-01T23:59:59.000Z

269

U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update (Presentation)  

DOE Green Energy (OSTI)

This presentation summarizes U.S. Fuel Cell Electric Vehicle Demonstration Project 2010 Status Update.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-10-21T23:59:59.000Z

270

Buried waste integrated demonstration human engineered control station. Final report  

SciTech Connect

This document describes the Human Engineered Control Station (HECS) project activities including the conceptual designs. The purpose of the HECS is to enhance the effectiveness and efficiency of remote retrieval by providing an integrated remote control station. The HECS integrates human capabilities, limitations, and expectations into the design to reduce the potential for human error, provides an easy system to learn and operate, provides an increased productivity, and reduces the ultimate investment in training. The overall HECS consists of the technology interface stations, supporting engineering aids, platform (trailer), communications network (broadband system), and collision avoidance system.

Not Available

1994-09-01T23:59:59.000Z

271

Wichita's Self Sufficient Energy Demonstration Center, The Energy Place. Final technical progress report  

SciTech Connect

This final technical report summarizes the results of a Program entitled, Wichita's Self Sufficient Energy Demonstration Center, The Energy Place operated by the City of Wichita Energy Place under a grant from the US Department of Energy within the Appropriate Technology Program. The grant for $23,204 was awarded on October 6, 1980. The main thrust of the proposal was to install and monitor the performance of a Darrieus Style Wind Generator. Shortly after the project began, it was recommended by the consultants from the Wind Energy Lab at Wichita State University, that the type of machine be changed from a Darrieus to a horizontal axis downwind SWECS (small wind energy conversion system). This change was approved by DOE. On August 6, 1981, an Enertech 4000 Wind Generator was installed at The Energy Place. The performance of the machine and its environmental impact have been studied by City staff with the assistance of two consultants. A 5000 watt gasoline powered alternator was also purchased and installed to provide the electrical needs of part of The Energy Place. This experiment demonstrates the self-sufficiency option that is not attainable with the wind system studied. This report recaps the first five quarters of the project, the final quarter and the reports of the consultants.

Pajor, J.T.

1982-01-01T23:59:59.000Z

272

Emergency Fish Restoration Project; Final Report 2002.  

DOE Green Energy (OSTI)

Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.

LeCaire, Richard

2003-03-01T23:59:59.000Z

273

INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION  

DOE Green Energy (OSTI)

With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water treatment/instrument air, and power conditioning/controls were built and shipped to the site. The two fuel cell modules, each rated at 1 MW on natural gas, were fabricated by FuelCell Energy in its Torrington, CT manufacturing facility. The fuel cell modules were conditioned and tested at FuelCell Energy in Danbury and shipped to the site. Installation of the power plant and connection to all required utilities and syngas was completed. Pre-operation checkout of the entire power plant was conducted and the plant was ready to operate in July 2004. However, fuel gas (natural gas or syngas) was not available at the WREL site due to technical difficulties with the gasifier and other issues. The fuel cell power plant was therefore not operated, and subsequently removed by October of 2005. The WREL fuel cell site was restored to the satisfaction of WREL. FuelCell Energy continues to market carbonate fuel cells for natural gas and digester gas applications. A fuel cell/turbine hybrid is being developed and tested that provides higher efficiency with potential to reach the DOE goal of 60% HHV on coal gas. A system study was conducted for a 40 MW direct fuel cell/turbine hybrid (DFC/T) with potential for future coal gas applications. In addition, FCE is developing Solid Oxide Fuel Cell (SOFC) power plants with Versa Power Systems (VPS) as part of the Solid State Energy Conversion Alliance (SECA) program and has an on-going program for co-production of hydrogen. Future development in these technologies can lead to future coal gas fuel cell applications.

FuelCell Energy

2005-05-16T23:59:59.000Z

274

Deep Geothermal Well and Power Plant Project Final Environmental...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oregon Institute of Technology (OIT) Deep Geothermal Well and Power Plant Project Final Environmental Assessment September 2008 Prepared for: U.S. Department of Energy 1617 Cole...

275

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

. The information from this project contributes to Energy Research and Development Division's Buildings EndUse Energy Efficiency Program. For more information about the Energy Research and Development Division Energy Research and Development Division FINAL PROJECT REPORT TECHNICAL BRIEFS

276

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT SMART GRID ROADMAP FOR RENEWABLES INTEGRATION JULY 2013 CEC5002010029 Prepared for: California Energy Commission Prepared by: California Energy Commission Dave Michel Project Manager Mike Gravely Office Manager Energy Efficiency

277

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT SMUD OFFPEAK OVERCOOLING PROJECT DECEMBER 2007 CEC5002013066 Prepared for: California Energy Commission Prepared by: Davis Energy Group #12; PREPARED BY: Primary Author(s): David Springer Davis Energy Group Davis, CA

278

Demonstration of wind turbine. Final technical report at grant program  

Science Conference Proceedings (OSTI)

Proposal F-602 is a demonstration of a commercially available wind-electric device - an Enertech Corp. Series 1800 model wind turbine. The demonstration site selected was the New Directions school campus, a public school facility, in Sarasota, Florida. During testing, an investigation of the wind power potential for the area was undertaken. In addition, negotiations with the Florida Power and Light Company for parallel operation of the wind system (utility interface), were initiated. An Operating Agreement contract is now pending approval by the Sarasota County School Board. The results to date, of this site's wind power potential, have been well below computational expectancies based upon wind speed data for the area. Analysis will continue, to determine the cause of the windplant's low net output.

Pendola, W. Jr.

1982-06-01T23:59:59.000Z

279

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. The strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. Within the Combustion Laboratory of the Penn State Energy Institute, they have installed and equipped a Navistar V-8 direct-injection turbodiesel engine for measurement of gaseous and particulate emissions and examination of the impact of fuel composition on diesel combustion. They have also reconfigured a high-pressure viscometer for studies of the viscosity, bulk modulus (compressibility) and miscibility of blends of diesel fuel, dimethyl ether and lubricity additives. The results include baseline emissions, performance and combustion measurements on the Navistar engine for operation on a federal low sulfur diesel fuel (300 ppm S). Most recently, they have examined blends of an oxygenated fuel additive (a liquid fuel called CETANER{trademark}) produced by Air Products, for comparison with dimethyl ether blended at the same weight of oxygen addition, 2 wt.%. While they have not operated the engine on DME yet, they are now preparing to do so. A fuel system for delivery of DME/Diesel blends has been configured and initial investigations at low DME blend ratios (around 5-10 vol%) will begin shortly. They have also performed viscosity measurements on diesel fuel, DME and 50-50 blends of DME in diesel. These tests have verified that DME has a much lower viscosity than the diesel fuel and that the viscosity of the blended fuel is also much lower than the diesel base fuel. This has implications for the injection and atomization of the DME/diesel blends.

Elana M. Chapman; Shirish Bhide; Andre L. Boehman; David Klinikowski

2003-04-01T23:59:59.000Z

280

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 13, October 1993--December 1993  

Science Conference Proceedings (OSTI)

In Dec 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. In November 1990, after a ten month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the thirteenth Technical Progress Report covering the period October 1, 1993 through the end of December 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in Aug 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Geothermal project summaries. Geothermal energy research, development and demonstration program  

DOE Green Energy (OSTI)

Summaries of all Division of Geothermal Energy supported projects for which contracts have been executed are compiled. Each summary includes pertinent statistical data for that project and an abstract summarizing the project plans and accomplishments. The projects summarized fall into six categories: engineering research and development, resource exploration and assessment, hydrothermal technology applications, advanced technology applications, utilization experiments, and environmental control and institutional studies. (MHR)

Not Available

1976-09-01T23:59:59.000Z

282

TX-100 manufacturing final project report.  

DOE Green Energy (OSTI)

This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.

Ashwill, Thomas D.; Berry, Derek S. (TPI Composites, Inc., Warren, RI)

2007-11-01T23:59:59.000Z

283

DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT  

DOE Green Energy (OSTI)

The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on the bus, operation on the campus shuttle route began in early June 2002. However, the work and challenges continued as it has been difficult to maintain operability of the shuttle bus due to fuel and component difficulties. In late June 2002, the pump head itself developed operational problems (loss of smooth function) leading to excessive stress on the magnetic coupling and excessive current draw to operate. A new pump head was installed on the system to alleviate this problem and the shuttle bus operated successfully on DME blends from 10-25 vol% on the shuttle bus loop until September 30, 2002. During the period of operation on the campus loop, the bus was pulled from service, operated at the PTI test track and real-time emissions measurements were obtained using an on-board emissions analyzer from Clean Air Technologies International, Inc. Particulate emissions reductions of 60% and 80% were observed at DME blend ratios of 12 vol.% and 25 vol.%, respectively, as the bus was operated over the Orange County driving cycle. Increases in NOx, CO and HC emissions were observed, however. In summary, the conversion of the shuttle bus was successfully accomplished, particulate emissions reductions were observed, but there were operational challenges in the field. Nonetheless, they were able to demonstrate reliable operation of the shuttle bus on DME-diesel blends.

Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

2003-04-01T23:59:59.000Z

284

Photosynthesis energy factory: analysis, synthesis, and demonstration. Final report  

DOE Green Energy (OSTI)

This quantitative assessment of the potential of a combined dry-land Energy Plantation, wood-fired power plant, and algae wastewater treatment system demonstrates the cost-effectiveness of recycling certain by-products and effluents from one subsystem to another. Designed to produce algae up to the limit of the amount of carbon in municipal wastewater, the algae pond provides a positive cash credit, resulting mainly from the wastewater treatment credit, which may be used to reduce the cost of the Photosynthesis Energy Factory (PEF)-generated electricity. The algae pond also produces fertilizer, which reduces the cost of the biomass produced on the Energy Plantation, and some gas. The cost of electricity was as low as 35 mills per kilowatt-hour for a typical municipally-owned PEF consisting of a 65-MWe power plant, a 144-acre algae pond, and a 33,000-acre Energy Plantation. Using only conventional or near-term technology, the most cost-effective algae pond for a PEF is the carbon-limited secondary treatment system. This system does not recycle CO/sub 2/ from the flue gas. Analysis of the Energy Plantation subsystem at 15 sites revealed that plantations of 24,000 to 36,000 acres produce biomass at the lowest cost per ton. The following sites are recommended for more detailed evaluation as potential demonstration sites: Pensacola, Florida; Jamestown, New York; Knoxville, Tennessee; Martinsville, Virginia, and Greenwood, South Carolina. A major possible extension of the PEF concept is to include the possibility for irrigation.

Not Available

1978-11-01T23:59:59.000Z

285

Helical Screw Expander Evaluation Project. Final report  

DOE Green Energy (OSTI)

A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

McKay, R.

1982-03-01T23:59:59.000Z

286

Northwest Open Automated Demand Response Technology Demonstration Project  

SciTech Connect

Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was conducted using three different baseline models for estimation peak load reductions. One was three-in-ten baseline, which is based on the site electricity consumption from 7 am to 10 am for the three days with the highest consumption of the previous ten business days. The second model, the LBNL outside air temperature (OAT) regression baseline model, is based on OAT data and site electricity consumption from the previous ten days, adjusted using weather regressions from the fifteen-minute electric load data during each DR test event for each site. A third baseline that simply averages the available load data was used for sites less with less than 10 days of historical meter data. The evaluation also included surveying sites regarding any problems or issues that arose during the DR test events. Question covered occupant comfort, control issues and other potential problems.

Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

2009-08-01T23:59:59.000Z

287

FCV Learning Demonstration: Project Midpoint Status and Fall 2007 Results  

DOE Green Energy (OSTI)

Status reoprt on NREL's fuel cell vehicle learning demonstration presented at the 2007 EVS-23 meeting in Anaheim, CA.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

288

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

staff at Southern California Edison and  Bonneville Power by Southern California Edison for this project.   Similar that Southern California Edison is initiating such tests 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

289

Project Final Report: HPC-Colony II  

SciTech Connect

This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

Jones, Terry R [ORNL] [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign] [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center] [IBM T. J. Watson Research Center

2013-11-01T23:59:59.000Z

290

Next Steps for the FCEV Learning Demonstration Project (Presentation)  

DOE Green Energy (OSTI)

This presentation summarizes project goals; vehicle and H2 station deployment status, critical performance compared to targets; highlights of latest vehicle and infrastructure analysis results and progress; learning demo next steps; highlights of partner activities and summary.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2011-02-01T23:59:59.000Z

291

LIFAC Sorbent Injection Desulfurization Demonstration Project. Quarterly report No. 12, July--September 1993  

Science Conference Proceedings (OSTI)

In December 1989, the U.S. Department of Energy selected 13 projects for funding under the Federal Clean Coal Technology Program (Round III). One of the projects selected was the project sponsored by LIFAC North America, (LIFAC NA), titled {open_quotes}LIFAC Sorbent Injection Desulfurization Demonstration Project.{close_quotes} The LIFAC technology uses upper-furnace limestone injection with patented humidification of the flue gas to remove 75-85% of the sulfur dioxide (SO{sub 2}) in the flue gas. The host site for this $22 million, three-phase project is Richmond Power and Light`s Whitewater Valley Unit No. 2 in Richmond, Indiana. The three project phases are: (1) Design; (2A) Long Lead Procurement; (2B) Construction; and (3) Operations. The design phase began on August 8, 1990 and was scheduled to last six months. Phase 2A, long lead procurement, overlaps the design phase and was expected to require about four months to complete. The construction phase was then to continue for another seven months, while the operations phase was scheduled to last about twenty-six months. In November 1990, after a ten (10) month negotiation period, LIFAC NA and the U.S. DOE entered into a Cooperative Agreement for the design, construction, and demonstration of the LIFAC system. This report is the twelfth Technical Progress Report covering the period July 1, 1993 through the end of September 1993. Due to the power plant`s planned outage in March 1991, and the time needed for engineering, design and procurement of critical equipment, DOE and LIFAC NA agreed to execute the Design Phase of the project in August 1990, with DOE funding contingent upon final signing of the Cooperative Agreement.

Not Available

1993-12-31T23:59:59.000Z

292

Demonstration, testing, and evaluation of in situ heating of soil. Volume 1, Final report  

SciTech Connect

This document is a final reports in two volumes. Volume I contains the technical report and Volume II contains appendices with background information and data. In this project approximately 300 cubic yards of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. It was demonstrated that the mass flow rate of the volatile organic chemicals was enhanced in the recovered soil gas as a result of heating.

Dev, H.; Enk, J.; Jones, D.; Sabato, W.

1996-04-05T23:59:59.000Z

293

Final Project Report Project 10749-4.2.2.1 2007-2009  

Science Conference Proceedings (OSTI)

This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

2009-05-11T23:59:59.000Z

294

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2005-09-30T23:59:59.000Z

295

The Sydney 2000 Olympic Games Forecast Demonstration Project: Forecasting, Observing Network Infrastructure, and Data Processing Issues  

Science Conference Proceedings (OSTI)

The Sydney 2000 Olympic Games World Weather Research Programme Forecast Demonstration Project (WWRP FDP) aimed to demonstrate the utility and impact of modern nowcast systems. The project focused on the use of radar processing systems and ...

Peter T. May; Thomas D. Keenan; Rod Potts; James W. Wilson; Rob Webb; Andrew Treloar; Elly Spark; Sue Lawrence; Elizabeth Ebert; John Bally; Paul Joe

2004-02-01T23:59:59.000Z

296

Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)  

DOE Green Energy (OSTI)

Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

2011-03-01T23:59:59.000Z

297

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2008  

DOE Green Energy (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2008.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2008-10-01T23:59:59.000Z

298

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update; Preprint  

DOE Green Energy (OSTI)

Summary of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project from initiation through January 2006.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.; Hooker, D.

2006-03-01T23:59:59.000Z

299

US Recovery Act Smart Grid Demonstration Projects | Open Energy Information  

Open Energy Info (EERE)

Projects Projects Jump to: navigation, search CSV Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":500,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

300

Sundance Energy Project Final Environmental Impact Statement  

SciTech Connect

Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

N /A

2001-06-29T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

This report documents the construction and performance testing of a 3000-ft length of fly ash base under a highway shoulder. Following three years of service, the road shoulder shows no signs of premature deterioration. This report should aid utilities seeking to increase ash-use rates in highway-related projects, as well as state highway design engineers responsible for preparing construction specifications.

1991-03-05T23:59:59.000Z

302

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT AFFORDABLE MULTIFAMILY ZERO ENERGY NEW HOMES Prepared for: California Energy Commission Prepared by: Global Global Green USA Santa Monica, CA 90405 Contract Number: 500-04-023 Prepared for: California Energy

303

Hybrid Cooling for Geothermal Power Plants: Final ARRA Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

at www.nrel.govpublications. Contract No. DE-AC36-08GO28308 Hybrid Cooling for Geothermal Power Plants Final ARRA Project Report Desikan Bharathan Technical Report NREL...

304

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ASSESSMENT OF LARVAL Coastal Boundary Layer Flow SEPTEMBER 2007 CEC5002013049 Prepared for: California Energy Commission Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy Generation Research

305

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT PRODUCTION OF SOLADIESEL RD® FROM CELLULOSIC FEEDSTOCKS JULY 2011 CEC5002013019 Prepared for: California Energy 650-780-4777 www.solazyme.com Contract Number: PIR08048 Prepared for: California Energy Commission

306

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT AN ASSESSMENT: California Energy Commission Prepared by: University of California, Davis #12; PREPARED BY: Primary Number: 500-01-016 Prepared for: California Energy Commission Prab Sethi Contract Manager Linda Spiegel

307

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT HIGHTECH BUILDINGS DECEMBER 2008 CEC5002013062 Prepared for: California Energy Commission Prepared by-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager Virginia Lew Office Manager

308

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF STEAM5002013092AP Prepared for: California Energy Commission Prepared by: University of California #12 Energy Commission David Effross Contract Manager Linda Spiegel Office Manager Energy Generation Research

309

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT LIGHTING CALIFORNIA'S FUTURE RetrofitIntegrated Classroom Lighting System (RICLS) Prepared for: California Energy Commission Managed by: Architectural Energy Corporation Prepared by: Finelite Inc. FEBRUARY 2013 CEC

310

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT AUTOMATED ROOFTOP CEC5002013042 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Energy Commission Brad Meister Contract Manager Virginia Lew Office Manager Energy Efficiency Research

311

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT PLANNING ALTERNATIVE5002013021 Prepared for: California Energy Commission Prepared by: Facet Decision Systems, Inc. #12-08-030 Prepared for: California Energy Commission Linda Spiegel Contract Manager Linda Spiegel Office Manager

312

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT Developing5002013109 Prepared for: California Energy Commission Prepared by: Growpro Inc #12; Prepared by Waimauku, New Zealand Contract Number: PIR-07-001 Prepared for: California Energy Commission Abolghasem

313

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT IMPACTS OF SHORTTERM Prepared for: California Energy Commission Prepared by: TIAX LLC #12; Prepared by: Primary Brown, Lawrence Berkeley National Laboratory Contract Number: MAQ-07-02 Prepared for: California Energy

314

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT Technology MARCH 2013 CEC5002012077 Prepared for: California Energy Commission Prepared by: Heschong Mahone-03-026 Prepared for: California Energy Commission Kristy Chew Contract Manager Fernando Pina Office Manager Energy

315

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT PRELIMINARY ESTIMATES5002013051 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory: 500-99-013 Prepared for: California Energy Commission Steve Ghadiri Contract Manager Fernando Piña

316

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT A SEASONAL DECEMBER 2011 CEC5002013035 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory Berkeley, CA 96270 Contract Number: 500-02-004 Prepared for: California Energy

317

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT RESEARCH ROADMAP Energy Commission Prepared by: California Institute for Energy and Environment #12; Prepared National Laboratory One Cyclotron Road, Berkeley, CA 94720 Energy Commercialization, LLC 375 Cameron Circle

318

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BUILDING Energy Commission Prepared by: Architectural Energy Corporation #12; PREPARED BY: Primary Author(s): Russ Derickson Architectural Energy Corporation Boulder, CO Contract Number: 500-99-013 Prepared for

319

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT HYBRID SOLAR LIGHTING5002013067 Prepared for: California Energy Commission Prepared by: Oakridge National Laboratory Insert-04-034-18 Prepared for: California Energy Commission Hassan Mohammed Contract Manager Linda Speigel Office Manager

320

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary.lbl.gov Contract Number: 500-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12 Energy Commission Raquel E. Kravitz Program Manager Fernando Pina Office Manager Energy Systems Research

322

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT GREENGUIDE FOR SUSTAINABLE ENERGY EFFICIENT REFRIGERATED STORAGE FACILITIES MARCH 2013 CEC-500-2013-145 Prepared for: California Energy for: California Energy Commission Anish Gautam Contract Manager Virginia Lew Office Manager Energy

323

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT EMISSIONS REDUCTIONS FROM RENEWABLE ENERGY AND ENERGY EFFICIENCY IN CALIFORNIA AIR QUALITY MANAGEMENT DISTRICTS DECEMBER 2011 CEC5002013047 Prepared for: California Energy Commission Prepared by: Synapse Energy

324

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary-09-010 Prepared for: California Energy Commission Matthew Fung Contract Manager Virginia Lew Office Manager Energy

325

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12: California Energy Commission Raquel Kravitz Program Manager Fernando Pina Office Manager Energy Systems

326

SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky  

SciTech Connect

The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

None

1982-03-01T23:59:59.000Z

327

Minewater heat recovery project. Final Technical report  

DOE Green Energy (OSTI)

This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

NONE

1992-04-01T23:59:59.000Z

328

Vermont gasifier project. Final report, Phase I  

DOE Green Energy (OSTI)

This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

NONE

1995-07-01T23:59:59.000Z

329

Performance Metrics Research Project - Final Report  

SciTech Connect

NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

Deru, M.; Torcellini, P.

2005-10-01T23:59:59.000Z

330

Southeast geysers effluent pipeline project. Final report  

DOE Green Energy (OSTI)

The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

Dellinger, M.

1998-01-15T23:59:59.000Z

331

Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume I  

SciTech Connect

This document is a draft final report (Volume 1) for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report and Volume II contains appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees} to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.

Dev, H.; Enk, J.; Jones, D.; Saboto, W.

1996-02-12T23:59:59.000Z

332

Use of Coal Ash in Highway Construction: Michigan Demonstration Project  

Science Conference Proceedings (OSTI)

A 3000-ft-length fly ash base under a highway shoulder will help demonstrate the impact of reused ash on structural integrity and groundwater. This report provides valuable design details for utilities seeking to increase ash reuse and for state highway design engineers responsible for preparing construction specifications.

1989-01-10T23:59:59.000Z

333

Baca geothermal demonstration project. Power plant detail design document  

DOE Green Energy (OSTI)

This Baca Geothermal Demonstration Power Plant document presents the design criteria and detail design for power plant equipment and systems, as well as discussing the rationale used to arrive at the design. Where applicable, results of in-house evaluations of alternatives are presented.

Not Available

1981-02-01T23:59:59.000Z

334

Solar demonstration project in a fast-food restaurant  

Science Conference Proceedings (OSTI)

Results are given of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

McClenahan, D.

1980-11-01T23:59:59.000Z

335

West Valley Demonstration Project Prepares to Relocate High-Level Waste |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Prepares to Relocate High-Level West Valley Demonstration Project Prepares to Relocate High-Level Waste West Valley Demonstration Project Prepares to Relocate High-Level Waste December 24, 2013 - 12:00pm Addthis The West Valley Demonstration Project’s high-level waste canisters will be relocated to interim onsite storage. The West Valley Demonstration Project's high-level waste canisters will be relocated to interim onsite storage. The first group of eight concrete storage casks for the West Valley Demonstration Project’s high-level waste. The first group of eight concrete storage casks for the West Valley Demonstration Project's high-level waste. Site subcontractor American DND completed demolition of the contaminated 01-14 Building in 2013. Site subcontractor American DND completed demolition of the contaminated

336

West Valley Demonstration Project Prepares to Relocate High-Level Waste |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Prepares to Relocate High-Level West Valley Demonstration Project Prepares to Relocate High-Level Waste West Valley Demonstration Project Prepares to Relocate High-Level Waste December 24, 2013 - 12:00pm Addthis The West Valley Demonstration Project’s high-level waste canisters will be relocated to interim onsite storage. The West Valley Demonstration Project's high-level waste canisters will be relocated to interim onsite storage. The first group of eight concrete storage casks for the West Valley Demonstration Project’s high-level waste. The first group of eight concrete storage casks for the West Valley Demonstration Project's high-level waste. Site subcontractor American DND completed demolition of the contaminated 01-14 Building in 2013. Site subcontractor American DND completed demolition of the contaminated

337

Klickitat Cogeneration Project : Final Environmental Assessment.  

SciTech Connect

To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

United States. Bonneville Power Administration; Klickitat Energy Partners

1994-09-01T23:59:59.000Z

338

Alaska Wood Biomass Energy Project Final Report  

SciTech Connect

The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

Jonathan Bolling

2009-03-02T23:59:59.000Z

339

Operation Dominic. Project Stemwinder. Final report  

SciTech Connect

The objective of Project Stemwinder was to probe and sample nuclear clouds as soon as possible after cloud stabilization in order to investigate the amount of radioactive debris which stabilizes in the troposphere and its distribution with height. Sampling was accomplished by the RB-57 aircraft. The detonations investigated were all air bursts over water during Operation Dominic I at Christmas Island. Some data for surface detonations obtained by sampling aircraft during Operation Redwing are used to compare with the Stemwinder data.

Ferber, G.J.

1985-09-01T23:59:59.000Z

340

Lied Animal Shelter Animal campus Renewable Energy Demonstration Project  

DOE Green Energy (OSTI)

The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

Randy Spitzmesser, AIA

2005-11-22T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Lied Animal Shelter Animal campus Renewable Energy Demonstration Project  

SciTech Connect

The Animal Shelter campus plan includes a new adoption center coupled with a dog adoption park, a wellness/veterinary technician education center, a show arena, and an addition to the existing shelter that will accommodate all animal control and sheltering for the Las Vegas Valley. The new facility will provide a sophisticated and innovative presentation of the animals to be adopted in an attempt to improve the public's perception of shelter animals. Additionally, the Regional Animal Campus will be a ''green building'', embodying a design intent on balancing environmental responsiveness, resource efficiency and cultural and community sensitivity. Designing an energy-efficient building helps reduce pollution from burning fossil fuels, reduce disturbance of natural habitats for the harvesting of resources and minimizes global warming. The project will be a leader in the use of renewable energy by relying on photovoltaic panels, wind turbines, and solar collectors to produce a portion of the project's energy needs The building will operate more efficiently in comparison to a typical shelter through the use of monitoring and specialized cooling/heating equipment. Windows bringing in natural daylight will reduce the center's demand for electricity.

Randy Spitzmesser, AIA

2005-11-22T23:59:59.000Z

342

International Smart Grid Demonstration Project Case Studies and Survey Analysis  

Science Conference Proceedings (OSTI)

Electric utilities around the world are assessing the technical issues and the prospective benefits and costs of modernizing the electric grid. This report summarizes research conducted on international smart grid demonstrations that were tasked with communicating results and lessons learned, and it highlights three case studies where this information has been conveyed. The research involved a literature review of publicly available information and a smart grid international survey answered by ...

2013-03-27T23:59:59.000Z

343

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

Science Conference Proceedings (OSTI)

The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

2008-07-25T23:59:59.000Z

344

Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development  

SciTech Connect

A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

1980-12-01T23:59:59.000Z

345

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT RWE SCHOTT SOLAR Energy Commission Prepared by: RWE Schott Solar, Inc #12; PREPARED BY: Primary Author(s): Miles C: California Energy Commission Hassan Mohammed Project Manager Linda Spiegel Office Manager Energy Generation

346

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT Integrated CHP Using UltraLow NOx Supplemental Firing MARCH 2013 CEC5002013043 Prepared for: California Energy://www.gastechnology.org Contract Number: PNG-07-006 Prepared for: California Energy Commission Gail Wiggett Project Manager Linda

347

Southern California Edison Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Company Company Country United States Headquarters Location Rosemead, California Recovery Act Funding $40,134,700.00 Total Project Value $80,269,400.00 Coordinates 34.0805651°, -118.072846° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

348

Beacon Power Corporation Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Beacon Power Corporation Beacon Power Corporation Country United States Headquarters Location Tyngsboro, Massachusetts Recovery Act Funding $24,063,978.00 Total Project Value $48,127,957.00 Coordinates 42.6767568°, -71.4245085° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

349

The Detroit Edison Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

The Detroit Edison Company The Detroit Edison Company Country United States Headquarters Location Detroit, Michigan Recovery Act Funding $4,995,271.00 Total Project Value $10,877,258.00 Coordinates 42.331427°, -83.0457538° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

350

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

NSTAR Electric & Gas Corporation NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $2,362,000.00 Total Project Value $4,724,000.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

351

Pacific Gas & Electric Company Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

Pacific Gas & Electric Company Pacific Gas & Electric Company Country United States Headquarters Location San Francisco, California Recovery Act Funding $25,000,000.00 Total Project Value $355,938,600.00 Coordinates 37.7749295°, -122.4194155° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

352

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Lead NSTAR Electric & Gas Corporation Lead NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $5,267,592.00 Total Project Value $10,535,184.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

353

Final report - Magma Energy Research Project  

DOE Green Energy (OSTI)

Scientific feasibility was demonstrated for the concept of magma energy extraction. The US magma resource is estimated at 50,000 to 500,000 quads of energy - a 700- to 7000-yr supply at the current US total energy use rate of 75 quads per year. Existing geophysical exploration systems are believed capable of locating and defining magma bodies and were demonstrated over a known shallow buried molten-rock body. Drilling rigs that can drill to the depths required to tap magma are currently available and experimental boreholes were drilled well into buried molten rock at temperatures up to 1100/sup 0/C. Engineering materials compatible with the buried magma environment are available and their performances were demonstrated in analog laboratory experiments. Studies show that energy can be extracted at attractive rates from magma resources in all petrologic compositions and physical configurations. Downhole heat extraction equipment was designed, built, and demonstrated successfully in buried molten rock and in the very hot margins surrounding it. Two methods of generating gaseous fuels in the high-temperature magmatic environment - generation of H/sub 2/ by the interaction of water with the ferrous iron and H/sub 2/, CH/sub 4/, and CO generation by the conversion of water-biomass mixtures - have been investigated and show promise.

Colp, J.L.

1982-10-01T23:59:59.000Z

354

Solar greenhouse training project. Final report  

DOE Green Energy (OSTI)

The goals of this project were: (1) To train twenty teams, each from a different region, to organize and run workshops to build inexpensive, practical solar greenhouses. (2) To help create working solar greenhouse experts in the field available to respond to their community's needs. (3) To establish a national model program for solar greenhouse construction workshops. (4) To determine whether the barn-raising style used in the greenhouse construction workshops could be taught in the format of a 3 1/2 day seminar with a follow-up workshop. (5) To determine whether the audio-visual exhibit and printed materials used in the seminar were effective. (MOW)

Davis, L.; Kensil, D.; Lazar, B.; Yanda, B.; Yanda, S.

1979-04-01T23:59:59.000Z

355

Fairbanks Geothermal Energy Project Final Report  

SciTech Connect

The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

Karl, Bernie [CHSR,LLC Owner] [CHSR,LLC Owner

2013-05-31T23:59:59.000Z

356

NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988  

Science Conference Proceedings (OSTI)

This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

Not Available

1991-01-01T23:59:59.000Z

357

Solar Total Energy Project final test report  

DOE Green Energy (OSTI)

The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report. 9 refs., 19 figs., 7 tabs.

Nelson, R.F.; Abney, L.O.; Towner, M.L. (Georgia Power Co., Shenandoah, GA (USA))

1990-09-01T23:59:59.000Z

358

Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project  

SciTech Connect

The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-­?based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­?hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-­?based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-­?hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries to utilize energy recycling technology to lower domestic energy use and see higher net energy efficiency. The prototype system and results will be used to seek additional resources to carry out full deployment of a system. Ultimately, this innovative technology is expected to be transferable to other testing applications involving energy-­?based cycling within the company as well as throughout the industry.

Bigelow, Erik

2012-10-30T23:59:59.000Z

359

Heber geothermal binary demonstration project: Unavailability distributions for principal pumps  

DOE Green Energy (OSTI)

The purpose of this study has been to review data sources relevant to the failure rate and mean time to repair for the principal pumps of the Heber geothermal project. Based upon that review the distributions of failure rates, repair times and pump unavailability were established. A total of 16 pumps are represented in this study. The method used to develop data distributions has been to first review as many sources of pump data as are currently available. This review was followed by a study of the features of the pumps specified for the Heber installation and the effects of operation and the environment on those features as they relate to anticipated failure rates and repair times. From this, determinations were made for mean failure rate and repair time values appropriate to specific Heber pumps. Range factors are then selected and used to establish the expected variability of the data. Failure rates and repair times were then combined to obtain the unavailability distribution of each type of pump.

Mulvihill, Robert J.; Cleveland, Edward B.

1982-04-01T23:59:59.000Z

360

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Solar greenhouse training project. Final report  

SciTech Connect

The goals of this project were: (1) To train twenty teams, each from a different region, to organize and run workshops to build inexpensive, practical solar greenhouses. (2) To help create working solar greenhouse experts in the field available to respond to their community's needs. (3) To establish a national model program for solar greenhouse construction workshops. (4) To determine whether the barn-raising style used in the greenhouse construction workshops could be taught in the format of a 3 1/2 day seminar with a follow-up workshop. (5) To determine whether the audio-visual exhibit and printed materials used in the seminar were effective. (MOW)

Davis, L.; Kensil, D.; Lazar, B.; Yanda, B.; Yanda, S.

1979-04-01T23:59:59.000Z

362

The Marysville, Montana Geothermal Project. Final Report  

DOE Green Energy (OSTI)

This report describes the exploration of an anomalous site near Marysville, Montana, where the geothermal heat flow is about 10 times the regional average. The site arouses scientific interest because there are no surface manifestations such as young volcanics, hot springs, geysers, etc., within 20 miles of it. Also, there is significant economic interest in exploring the source of heat as a potential for the generation of electricity. Included herein are independent sections prepared by each contractor. Consequently, there is some overlapping information, generally presented from different viewpoints. The project consists of geophysical surveys in 1973 and 1974, the drilling of the deep well in the summer of 1974 to a depth of 6790 feet, the coring and logging of the well, the supporting scientific studies, and the data analysis. Since so much data are available on the Marysville system, it can serve as a testing and research area to help locate and understand similar systems. (GRA)

Not Available

1975-09-01T23:59:59.000Z

363

Advanced Blade Manufacturing Project - Final Report  

SciTech Connect

The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

POORE, ROBERT Z.

1999-08-01T23:59:59.000Z

364

Blade Manufacturing Improvement Project: Final Report  

SciTech Connect

The Blade Manufacturing Improvement Project explores new, unique and improved materials integrated with innovative manufacturing techniques that promise substantial economic enhancements for the fabrication of wind turbine blades. The primary objectives promote the development of advanced wind turbine blade manufacturing in ways that lower blade costs, cut rotor weight, reduce turbine maintenance costs, improve overall turbine quality and increase ongoing production reliability. Foam Matrix (FMI) has developed a wind turbine blade with an engineered foam core, incorporating advanced composite materials and using Resin Transfer Molding (RTM) processes to form a monolithic blade structure incorporating a single molding tool. Patented techniques are employed to increase blade load bearing capability and insure the uniform quality of the manufactured blade. In production quantities, FMI manufacturing innovations may return a sizable per blade cost reduction when compared to the cost of producing comparable blades with conventional methods.

SHERWOOD, KENT

2002-10-01T23:59:59.000Z

365

Federal Methanol Fleet Project final report  

DOE Green Energy (OSTI)

The Federal Methanol Fleet Project concluded with the termination of data collection from the three fleet sites in February 1991. The Lawrence Berkeley Laboratory (LBL) completed five years of operation, Argonne National Laboratory (ANL) completed its fourth year in the project, and Oak Ridge National Laboratory (ORNL) completed its third. Twenty of the thirty-nine vehicles in the fleet were powered by fuel methanol (typically M85, 85 % methanol, 15 % unleaded gasoline, although the LBL fleet used M88), and the remaining control vehicles were comparable gasoline vehicles. Over 2.2 million km (1.4 million miles) were accumulated on the fleet vehicles in routine government service. Data collected over the years have included vehicle mileage and fuel economy, engine oil analysis, emissions, vehicle maintenance, and driver acceptance. Fuel economies (on an energy basis) of the methanol and gasoline vehicles of the same type were comparable throughout the fleet testing. Engine oil analysis has revealed higher accumulation rates of iron and other metals in the oil of the methanol vehicles, although no significant engine damage has been attributed to the higher metal content. Vehicles of both fuel types have experienced degradation in their emission control systems, however, the methanol vehicles seem to have degraded their catalytic converters at a higher rate. The methanol vehicles have required more maintenance than their gasoline counterparts, in most cases, although the higher levels of maintenance cannot be attributed to ``fuel-related`` repairs. According to the daily driver logs and results from several surveys, drivers of the fleet vehicles at all three sites were generally satisfied with the methanol vehicles.

West, B.H.; McGill, R.N. [Oak Ridge National Lab., TN (United States); Hillis, S.L.; Hodgson, J.W. [Tennessee Univ., Knoxville, TN (United States)

1993-03-01T23:59:59.000Z

366

Federal Methanol Fleet Project final report  

DOE Green Energy (OSTI)

The Federal Methanol Fleet Project concluded with the termination of data collection from the three fleet sites in February 1991. The Lawrence Berkeley Laboratory (LBL) completed five years of operation, Argonne National Laboratory (ANL) completed its fourth year in the project, and Oak Ridge National Laboratory (ORNL) completed its third. Twenty of the thirty-nine vehicles in the fleet were powered by fuel methanol (typically M85, 85 % methanol, 15 % unleaded gasoline, although the LBL fleet used M88), and the remaining control vehicles were comparable gasoline vehicles. Over 2.2 million km (1.4 million miles) were accumulated on the fleet vehicles in routine government service. Data collected over the years have included vehicle mileage and fuel economy, engine oil analysis, emissions, vehicle maintenance, and driver acceptance. Fuel economies (on an energy basis) of the methanol and gasoline vehicles of the same type were comparable throughout the fleet testing. Engine oil analysis has revealed higher accumulation rates of iron and other metals in the oil of the methanol vehicles, although no significant engine damage has been attributed to the higher metal content. Vehicles of both fuel types have experienced degradation in their emission control systems, however, the methanol vehicles seem to have degraded their catalytic converters at a higher rate. The methanol vehicles have required more maintenance than their gasoline counterparts, in most cases, although the higher levels of maintenance cannot be attributed to fuel-related'' repairs. According to the daily driver logs and results from several surveys, drivers of the fleet vehicles at all three sites were generally satisfied with the methanol vehicles.

West, B.H.; McGill, R.N. (Oak Ridge National Lab., TN (United States)); Hillis, S.L.; Hodgson, J.W. (Tennessee Univ., Knoxville, TN (United States))

1993-03-01T23:59:59.000Z

367

Yakima Fisheries Project : Final Environmental Impact Statement.  

DOE Green Energy (OSTI)

BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

1996-01-01T23:59:59.000Z

368

Semiconductor grade, solar silicon purification project. Final technical report  

DOE Green Energy (OSTI)

Motorola's low cost poly silicon program is described. In the process, SiF/sub 4/, a low cost by-product is reacted with mg silicon to form SiF/sub 2/ gas which is polymerized. The (SiF/sub 2/)/sub x/ polymer is heated forming volatile Si/sub x/F/sub y/ homologues which disproportionate (C.V.D.) on a silicon particle bed forming silicon and SiF/sub 4/. During the initial phases of the investigation the silicon analysis procedure relied heavily on S.S.M.S. and E.S. analysis. This analysis demonstrated that major purification had occurred and some samples were indistinguishable from semiconductor grade silicon (except possibly for phosphorus). However, more recent electrical analysis via crystal growth reveals that the product contains compensated phosphorus and boron. Work on the control or removal of the electrically active donors and acceptors could yield a product suitable for solar application. The low projected product cost and short energy payback time suggest that the economics of this process will result in a cost less than the J.P.L./D.O.E. goal of $10/Kg (1975 dollars). Finally, assuming a successful demonstration of a pilot facility, the process appears to be readily scalable to a major silicon purification facility as was proposed by Motorola and R. Katzen.

Ingle, W.M.; Rosler, R.S.; Thompson, S.W.; Chaney, R.E.

1979-12-10T23:59:59.000Z

369

Tidd PFBC demonstration project. Quarterly report, October--December 1993  

SciTech Connect

This is the 27th Technical Progress Report submitted to the Department of Energy in connection with the Cooperative Agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1993 to December 31, 1993. Major activities during this period involve: (1) The unit operated for 720 hours on coal. (2) There were five gas turbine starts, five bed preheater starts, and three operating periods on coal fire. (3) During the quarter, total gross generation was 36,672 MWH, the peak unit output for one hour was 64 MWH, and the coal consumption was 17,251 tons. (4) Six performance tests were run during this quarter. (5) The unit was tested with four sorbent feed points. (6) The gas turbine low pressure compressor was disassembled to repair cracks in the stationary guide vanes; and (7) a request was sent to the DOE requesting funding for an additional year of operation. Major items planned for the next period include: (a) Continuation of sorbent utilization tests at various bed levels and sulfur retention values and with different coals and adsorbents; and (b) operation at full load.

Not Available

1994-01-01T23:59:59.000Z

370

Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ormat Geothermal Ormat Geothermal Project in Nevada Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in Nevada September 23, 2011 - 3:37pm Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu today announced the Department finalized a partial guarantee for up to a $350 million loan to support a geothermal power generation project. The project, sponsored by Ormat Nevada, Inc., is expected to produce up to 113 megawatts (MW) of clean, baseload power from three geothermal power facilities and will increase geothermal power production in Nevada by nearly 25 percent. The facilities are Jersey Valley in Pershing County, McGinness Hills in Lander County and Tuscarora in Elko County. The company estimates the project will fund 332 jobs during construction and 64 during operations.

371

Aerogel commercialization pilot project. Final program report  

Science Conference Proceedings (OSTI)

Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

NONE

1996-02-13T23:59:59.000Z

372

SustainX, Inc. Smart Grid Demonstration Project | Open Energy Information  

Open Energy Info (EERE)

SustainX, Inc. Smart Grid Demonstration Project SustainX, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead SustainX, Inc. Country United States Headquarters Location West Lebanon, New Hampshire Recovery Act Funding $5,396,023.00 Total Project Value $10,792,045.00 References ARRA Smart Grid Demonstration Projects[1] This article is a stub. You can help OpenEI by expanding it. The SustainX, Inc. Smart Grid Demonstration Project is a U.S. Department of Energy Smart Grid Demonstration Project which is based in West Lebanon, New Hampshire. Overview Design, build, and deploy a utility-scale, low-cost compressed air energy storage system to support the integration of renewable energy sources onto the grid. The 1 MW/4hr system will store potential energy in the form of compressed air in above-ground industrial pressure facilities. The

373

Development of the Decontamination Approach for the West Valley Demonstration Project Decontamination Project Plan  

SciTech Connect

This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary mission at the WVDP is to solidify high-level liquid nuclear waste safely; transport the high-level waste (HLW) to a federal repository; and decontaminate and decommission the facilities and hardware used to solidify the HLW and conduct the WVDP. This includes a provision for the disposal of low-level waste (LLW) and transuranic waste (TRU) produced during processing of the HLW. Continuation of the effort to reduce the hazard and risk associated with historic operations to the extent needed to ensure the health and safety of the public and the environment will see a change in focus from stabilization of liquid HLW to stabilization of former plutonium and uranium extraction (PUREX) reprocessing plant facilities. This will be achieved through the activities of in-cell component removal and packaging, and preparation for long-term disposal of the long- lived radionuclides. These radionuclides are associated with the former PUREX facility operations, including, and upstream from, facilities utilized in the primary separation and first plutonium/uranium split cycles. The closure strategy for the WVDP is subject to ongoing evaluation and decision-making involving DOE and NYSERDA. Implementation will be subject to a future Record of Decision (ROD) and an Environmental Impact Statement (EIS).

Milner, T. N.; Watters, W. T.

2002-02-25T23:59:59.000Z

374

NTRCI Legacy Engine Research and Development Project Final Technical Report  

DOE Green Energy (OSTI)

Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

Connie Smith-Holbert; Joseph Petrolino; Bart Watkins; David Irick

2011-12-31T23:59:59.000Z

375

Solar hot water demonstration project at Red Star Industrial Laundry, Fresno, California  

SciTech Connect

The Final Report of the Solar Hot Water System located at the Red Star Industrial Laundry, 3333 Sabre Avenue, Fresno, California, is presented. The system was designed as an integrated wastewater heat recovery and solar preheating system to supply a part of the hot water requirements. It was estimated that the natural gas demand for hot water heating could be reduced by 56 percent (44 percent heat reclamation and 12 percent solar). The system consists of a 16,500 gallon tube-and-shell wastewater heat recovery subsystem combined with a pass-through 6,528 square foot flat plate Ying Manufacturing Company Model SP4120 solar collector subsystem, a 12,500 gallon fiber glass water storage tank subsystem, pumps, heat exchangers, controls, and associated plumbing. The design output of the solar subsystem is approximately 2.6 x 10/sup 9/ Btu/year. Auxiliary energy is provided by a gas fired low pressure boiler servicing a 4,000 gallon service tank. This project is part of the US Department of Energy's Solar Demonstration Program with DOE sharing $184,841 of the $260,693 construction cost. The system was turned on in July 1977, and acceptance tests completed in September 1977. The demonstration period for this project ends September 2, 1982.

1980-07-01T23:59:59.000Z

376

Final Report on Grand Challenge LDRD Project:  

NLE Websites -- All DOE Office Websites (Extended Search)

SAND 2004-2365 SAND 2004-2365 UNLIMITED RELEASE PRINTED MAY 2004 F F i i n n a a l l R R e e p p o o r r t t o o n n G G r r a a n n d d C C h h a a l l l l e e n n g g e e L L D D R R D D P P r r o o j j e e c c t t : : A A R R e e v v o o l l u u t t i i o o n n i i n n L L i i g g h h t t i i n n g g - - B B u u i i l l d d i i n n g g t t h h e e S S c c i i e e n n c c e e a a n n d d T T e e c c h h n n o o l l o o g g y y B B a a s s e e f f o o r r U U l l t t r r a a - - E E f f f f i i c c i i e e n n t t S S o o l l i i d d - - S S t t a a t t e e L L i i g g h h t t i i n n g g Solid-State Lighting GCLDRD Final Report Page 3 of 151 J. A. Simmons, J. Y. Tsao, S. R. Kurtz, T. M. Bauer, R. J. Kaplar, W. W. Chow, E. D. Jones, K. E. Waldrip, S. R. Lee, A. J. Fischer, M. H. Crawford, K. W. Fullmer, and B. L. Abrams Semiconductor Material and Device Sciences Department R. M. Biefeld, D. D. Koleske, A. A. Allerman, J. J. Figiel, R. J. Creighton, M. E. Coltrin,

377

Final Report Limited Soil Investigation of Project Chariot Test Holes  

Office of Legacy Management (LM)

Limited Soil Investigation of Project Limited Soil Investigation of Project Chariot Test Holes Cape Thompson, Alaska December 2010 Prepared for U.S. Department of Energy and U.S. Army Corps of Engineers, Alaska District Post Office Box 6898 Elmendorf AFB, Alaska 99506-6898 Contract W911KB-08-D-0003 Task Order 12, Mod 001 Prepared by Fairbanks Environmental Services 3538 International Street Fairbanks, Alaska 99701 (907) 452-1006 FES Project No. 5012-06 Final Report Limited Soil Investigation of Project Chariot Test Holes, Cape Thompson, Alaska Fairbanks Environmental Services 5012-06 TABLE OF CONTENTS Page Number EXECUTIVE SUMMARY 1.0 INTRODUCTION ................................................................................................... 1-1

378

Self-Correcting HVAC Controls Project Final Report  

SciTech Connect

This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

2010-01-04T23:59:59.000Z

379

Tritium research laboratory cleanup and transition project final report  

Science Conference Proceedings (OSTI)

This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

Johnson, A.J.

1997-02-01T23:59:59.000Z

380

New Jersey Radium Research Project: final report  

SciTech Connect

Cancers among dead New Jersey subjects were almost three times the expected number. Their radiation experience apparently acted as a generalized carcinogen. Conventional clinical, laboratory and roentgenographic tests neither correlated with calculated radiation exposure nor predicted which subjects subsequently developed cancer. More subjects than expected were deaf and enough of the subjects had increased erythrocyte sedimentation rates and decreased alpha-1 serum globulin levels that both hearing tests and tests of immune competence should be undertaken among asymptomatic exposed populations at regular intervals to see whether these may indicate radiation effects prior to a fatal cancer or blood dyscrasia. If pre-terminal radium-226 burdens validly express total irradiation experience, and past exposure to shorter-lived radium-228 (mesothorium) makes it unlikely that this is so, the distribution of radium osteitis among our subjects suggests that anatomically demonstrable radiation injury occurs in the vast majority of subjects with any radium-226 burden that can be measured above background levels after twenty-five years, and in almost half of those exposed whose measured radium-226 burdens are indistinguishable from background levels. Modification of the occupational exposure standard is recommended. (PCS)

Sharpe, W.D.

1979-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project - Technology Demonstration of Fixatives Applied Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms Many facilities slated for D&D across the DOE complex pose hazards (radiological, chemical, and structural) which prevent the use of traditional manual techniques. D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms More Documents & Publications Demonstration of Fixatives to Control Contamination and Accelerate D&D Demonstration of DeconGel (TM) at the Oak Ridge National Laboratory Building 2026 D&D Toolbox Project - Technology Demonstration of Fixatives Applied to Hot Cell Facilities via Remote Sprayer Platforms

382

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2006 Progress Update (Presentation)  

DOE Green Energy (OSTI)

This presentation, given by NREL's Keith Wipke at EVS-22, provides an update on the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.

2006-10-26T23:59:59.000Z

383

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Data Analysis Overview; Preprint  

DOE Green Energy (OSTI)

Paper for the 2005 National Hydrogen Association conference provides an overview of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Welch, C.; Wipke, K.; Gronich, S.; Garbak, J.

2005-03-01T23:59:59.000Z

384

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update (Presentation)  

DOE Green Energy (OSTI)

Presentation outlining the progress of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, prepared for the 2006 National Hydrogen Association Meeting.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak. J.; Hooker, D.

2006-03-13T23:59:59.000Z

385

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Progress Update (Presentation)  

DOE Green Energy (OSTI)

Presentation outlining the progress of DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project, prepared for the 2006 National Hydrogen Association Meeting.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak. J.; Hooker, D.

2006-01-01T23:59:59.000Z

386

High Performance Building Facade Solutions: PIER Final Project Report  

NLE Websites -- All DOE Office Websites (Extended Search)

High Performance Building Facade Solutions: PIER Final Project Report High Performance Building Facade Solutions: PIER Final Project Report Title High Performance Building Facade Solutions: PIER Final Project Report Publication Type Report LBNL Report Number LBNL-4583E Year of Publication 2009 Authors Lee, Eleanor S., Stephen E. Selkowitz, Dennis L. DiBartolomeo, Joseph H. Klems, Robert D. Clear, Kyle Konis, Robert J. Hitchcock, Mehry Yazdanian, Robin Mitchell, and Maria Konstantoglou Date Published 12/2009 Abstract Building façades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. façades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.

387

DOE NN-20 microboreholes project. Final project report  

SciTech Connect

Los Alamos National Laboratory (LANL) and its contractors have developed a conceptual design for a directional microborehole drilling system for hard-rock boring. Analytical calculations, simulations, and the results of laboratory testing of critical prototype drilling components have influenced the design. Two reduced-size drilling systems to produce small diameter, 500-ft-long, directionally drilled river crossing trajectories are proposed to prove feasibility of the concept: (1) a 2-1/4-in. diameter, early demonstration unit to drill directional ultraslimholes; and (2) a 1-1/8-in. diameter, ultimate design to drill directional microboreholes. Both concepts use versatile, coiled-tubing-deployed, hydraulically-powered drilling assemblies, and a surface platform that includes a tubing injector unit to develop high load insertion (snubbing) of the tubing into the sealed borehole. Surface injection will be used to develop the required bit thrust, and both concepts provide for the use of a commercial, real-time, location and steering system that is readily and routinely adapted for deployment on a coiled-tubing drilling platform. The conceptual drilling platform and its subassemblies are shown.

Dreesen, D.S.

1997-03-12T23:59:59.000Z

388

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

389

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

390

NTRCI Legacy Engine Research and Development Project Final Technical Report  

SciTech Connect

The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engineâ??s commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

Connie Smith-Holbert; Joseph Petrolino; Bart Watkins; David Irick

2011-12-31T23:59:59.000Z

391

Southern California Edison (SCE) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Southern California Edison (SCE) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed genera...

2010-07-27T23:59:59.000Z

392

Sacramento Municipal Utility District Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Sacramento Municipal Utility District Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institutes (EPRIs) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 21 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, ...

2011-08-05T23:59:59.000Z

393

Electricite' de France (EDF) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Electricité de France (EDF) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute’s (EPRI’s) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and dist...

2009-09-16T23:59:59.000Z

394

KCP&L Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report describes the Kansas City Power and Light (KCP&L) Smart Grid demonstration host-site project as part of the Electric Power Research Institute’s (EPRIs) five-year Smart Grid demonstration initiative. The EPRI initiative includes core Smart Grid research and several large-scale Smart Grid projects with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distributed renewab...

2010-04-01T23:59:59.000Z

395

FirstEnergy Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the FirstEnergy Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute’s (EPRI’s) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewabl...

2009-09-24T23:59:59.000Z

396

American Electric Power (AEP) Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the American Electric Power (AEP) Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects with 19 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and di...

2009-09-16T23:59:59.000Z

397

Hydro-Quebec Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report describes the Hydro Qubec Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) five-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and several large-scale smart grid projects with 21 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a...

2011-08-08T23:59:59.000Z

398

Project Independence. Final task force report: geothermal energy  

SciTech Connect

This report contains the final technical analysis of the Project Independence Interagency Geothermal Task Force chaired by the National Science Foundation. The potential of geothermal energy, resources, fuel cycles, and the status of geothermal technology are outlined. Some constraints inhibiting rapid and widespread utilization and some Federal actions to remove utilization barriers are described. (MOW)

1974-11-01T23:59:59.000Z

399

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT PILOT PHASE OF A FIELD STUDY TO DETERMINE WASTE OF WATER AND ENERGY IN RESIDENTIAL HOT WATER DISTRIBUTION SYSTEMS JULY 2009 CEC-500-2013-135 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12;PREPARED

400

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT LIFE-CYCLE ASSESSMENT AND URBAN SUSTAINABILITY OCTOBER 2010 CEC-500-2013-129 Prepared for: California Energy Commission Prepared by: University for: California Energy Commission Erik Stokes Contract Manager Linda Spiegel Office Manager Energy

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF STEAM for: California Energy Commission Prepared by: University of California #12; PREPARED BY: Primary-781-5791 951-781-5790 (fax) Contract Number: 500-09-008 Prepared for: California Energy Commission David

402

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT SMART GRID INFORMATION ASSURANCE AND SECURITY TECHNOLOGY ASSESSMENT DECEMBER 2010 CEC5002013056 Prepared for: California Energy-278-7659 www.csus.edu Contract Number: CEC-500-2008-027 Prepared for: California Energy Commission David

403

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BIOENERGETICS, SPACIAL for: California Energy Commission Prepared by: University of California, Santa Barbara #12;PREPARED BY Number: UC MRA-061 Prepared for: California Energy Commission Joe O'Hagan Contract Manager Linda Spiegel

404

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT LOW­COST, ENERGY­SAVING, SOLID STATE SMART WINDOWS AUGUST 2012 CEC5002013026 Prepared for: California Energy Commission Number: PIR-10-049 Prepared for: California Energy Commission Dustin Davis Contract Manager Virginia Lew

405

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA TRANSMISSION CONGESTION ASSESSMENT DECEMBER 2007 CEC-500-2011-007 Prepared for: California Energy Commission Prepared by: Electric Pasadena, CA Contract Number: BOA-142 Prepared for: California Energy Commission Jamie Patterson Contract

406

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT THE ICHTHYOPLANKTON OF KING HARBOR, REDONDO BEACH, CALIFORNIA 19742006 APRIL 2008 CEC5002013053 Prepared for: California Energy Angeles, CA 90041 Contract Number: 500-04-025 Prepared for: California Energy Commission Joseph O

407

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF NEW TESTING PROTOCOLS FOR MEASURING THE PERFORMANCE OF SHOWERHEADS MARCH 2010 CEC-500-2013-130 Prepared for: California Energy: California Energy Commission Brad Meister Contract Manager Virginia Lew Office Manager Energy Efficiency

408

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

i Energy Research and Development Division FINAL PROJECT REPORT INLET AIR SPRAY COOLING ENHANCEMENT FOR AIRCOOLED CONDENSERS JUNE 2007 CEC5002013058 Prepared for: California Energy CommissionFilippo Maulbetsch Consulting Menlo Park, CA 94025 Contract Number: 500-02-014 Prepared for: California Energy

409

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BUILDING COMMISSIONING INTO STATE BUILDING CONSTRUCTION DECEMBER 2010 CEC-500-2013-117 Prepared for: California Energy Commission Prepared by: Architectural Energy Corporation #12;PREPARED BY: Primary Author(s): Russ Derickson

410

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT COMPENSATION CEC5002013114 Prepared for: California Energy Commission Prepared by: Stratus Consulting Inc. #12-04-025 Prepared for: California Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy

411

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT POLICY TO FACILITATE DEMAND RESPONSE JUNE 2008 CEC5002010015 Prepared for: California Energy Commission Prepared'Monte Information Services, Inc. Ukiah, CA 95482 Contract Number: 500-99-013 Prepared for: California Energy

412

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT PROBABILISTIC TRANSMISSION CONGESTION FORECASTING DECEMBER 2012 CEC-500-2013-120 Prepared for: California Energy Commission Prepared by: Electric Research Institute Contract Number: UC MR-052 Prepared for: California Energy Commission Jamie Patterson

413

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT NOVEMBER 2010 CEC5002013048 Prepared for: California Energy Commission Prepared by: California Biomass Collaborative BIOFUELS as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views

414

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT AIRQUALITY IMPACTS OF HEAT5002013061 Prepared for: California Energy Commission Prepared by: Altostratus Inc. A L T O S T R Contract Number: 500-08-007 Prepared for: California Energy Commission Marla Mueller Contract Manager Guido

415

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT Production of Substituted Natural 2012 CEC5002013104 Prepared for: California Energy Commission Prepared by: University of California-781-5791 951-781-5790 (fax) www.ucr.edu Contract Number: 500-11-004 Prepared for: California Energy Commission

416

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT NEW ENGINE TECHNOLOGY FOR CALIFORNIA'S COMBINED HEAT AND POWER MARKET MARCH 2013 CEC-500-2013-119 Prepared for: California Energy Commission Waltham, MA 02451 781-466-6431 www.tecogen.com Contract Number: PIR-08-022 Prepared for: California Energy

417

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT LIFECYCLE ENERGY: California Energy Commission Prepared by: University of California, Berkeley Department of Civil-1712 510-642-7300 Contract Number: 500-02-004 Work Authorization MR-048 Prepared for: California Energy

418

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT THE VALUE OF NATURAL GAS STORAGE-2013-131 Prepared for: California Energy Commission Prepared by: ICF International #12;PREPARED BY: Primary Author: California Energy Commission David Michel Contract Manager Fernando Pina Office Manager Energy Systems

419

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGY REDUCTION IN MEMBRANE-2013-132 Prepared for: California Energy Commission Prepared by: University of California, Irvine and Kennedy Main Street, Suite 140 Irvine, CA 92614 Contract Number: MRA-02-082 Prepared for: California Energy

420

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

ELECTRIC FUEL IMPLEMENTATION IN CALIFORNIA: OVERCOMING BATTERY FIRST-COST HURDLES JUNE 2011 CEC-500 for Transportation Electric Fuel Implementation in California: Overcoming Battery First-Cost Hurdles is the final Battery First-Cost Hurdles project (contract number UC MRA-02-086) conducted by University of California

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

422

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING5002013083AP Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

423

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network (OSTI)

GENERATION USING PARABOLIC TROUGH SOLAR COLLECTION NOVEMBER 2010 CEC5002011040 Prepared for: California Generation Using Parabolic Trough Solar Collection is the final report for the Reduce Natural Gas Use for Industrial Process Heat using High- Temperature Parabolic Trough Solar Collectors project (Contract Number

424

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy Commission Raquel E. Kravitz

425

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary Diego, CA 92182-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy

426

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT RANKING AND PRIORITIZING THE DEPLOYMENT OF COMMUNITY- SCALE ENERGY MEASURES BASED ON THEIR INDIRECT EFFECTS IN CALIFORNIA'S CLIMATE ZONES MARCH 2013 CEC-500-2013-122 ALTOSTRATUS Prepared for: California Energy Commission Prepared by

427

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT POTENTIAL TARGETS AND BENEFITS FOR URBAN ENERGY SYSTEMS RESEARCH MAY 2009 CEC-500-2010-009 Prepared for: California Energy Commission Institute of the Environment Los Angeles, CA Contract Number: BOA-99-207-P Prepared for: California Energy

428

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

Energy Research and Development Division FINAL PROJECT REPORT SUMMARY OF RECENT WIND INTEGRATION STUDIES Experience from 2007-2010 APRIL 2012 CEC-500-2013-124 Prepared for: California Energy Commission Prepared by: California Wind Energy Collaborative #12;PRIMARY AUTHOR(S): Phillip de Mello C.P. (Case) van

429

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network (OSTI)

of Numerical Weather Prediction for Intra-Day Solar Forcasting number 500-08-017 conducted by the UniversityEnergy Research and Development Division FINAL PROJECT REPORT EVALUATION OF NUMERICAL WEATHER PREDICTION FOR SOLAR FORECASTING Prepared for: California Energy Commission Prepared by: California Solar

430

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grant Grant Amount Non-Fed Amount Project Location (City) Project Location (State) Description 1) Pilot and Demonstration Scale FOA - Pilot Scale Algenol Biofuels Inc. $25,000,000 $33,915,478 Freeport TX This project will make ethanol directly from carbon dioxide and seawater using algae. The facility will have the capacity to produce 100,000 gallons of fuel- grade ethanol per year. American Process Inc. $17,944,902 $10,148,508 Alpena MI This project will produce fuel and potassium acetate, a compound with many industrial applications, using processed wood generated by Decorative Panels International, an existing hardboard manufacturing facility in Alpena. The pilot plant will

431

Real-Time Grid Reliability Management PIER Final Project Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Real-Time Grid Reliability Management PIER Final Project Report Real-Time Grid Reliability Management PIER Final Project Report Title Real-Time Grid Reliability Management PIER Final Project Report Publication Type Report Year of Publication 2008 Authors Eto, Joseph H., Manu Parashar, Bernard C. Lesieutre, and Nancy J. Lewis Pagination 62 Date Published 12/2008 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract The increased need to manage California's electricity grid in real time is a result of the ongoing transition from a system operated by vertically integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools.

432

Five kW Solid Oxide Fuel Cell Demonstration Project: Case Study: Exit Glacier Nature Center Acumentrics Demonstration  

Science Conference Proceedings (OSTI)

This case study documents the demonstration experiences and lessons learned from a 5 kW solid oxide fuel cell system operating on propane at the Kenai Fiords National Park at the Exit Glacier Visitor Center, Seward, Alaska. The case study is one of several fuel cell project case studies under research by EPRI's Distributed Energy Resources Program. This case study is designed to help utilities and other interested parties understand the early applications of fuel cell systems to help them in their resour...

2005-02-17T23:59:59.000Z

433

Microsoft Word - Project_Fact_Sheet_wPictures_FINAL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Microholes for Oil Production and Microholes for Oil Production and Emplacement of Subsurface Seismic Instrumentation ID Number: 03FE06-4 Program The goals of the present Phase II project are (1) to demonstrate the use of microboreholes with 1-in.-diameter, retrievable seismic arrays installed in the bores, to collect high quality seismic data at a substantially reduced cost compared with the use of conventional-sized boreholes, and (2) to determine if higher quality seismic data can be obtained in a microhole well completion that is designed to enhance seismic-data collection. This project evolved from the earlier Phase I project with a goal to demonstrate the use of microboreholes for use as producing oil wells. Project Goals The overall objective of the Los Alamos National Laboratory (Los Alamos) Phase II

434

The Sydney 2000 World Weather Research Programme Forecast Demonstration Project: Overview and Current Status  

Science Conference Proceedings (OSTI)

The first World Weather Research Programme (WWRP) Forecast Demonstration Project (FDP), with a focus on nowcasting, was conducted in Sydney, Australia, from 4 September to 21 November 2000 during a period associated with the Sydney 2000 Olympic ...

T. Keenan; P. Joe; J. Wilson; C. Collier; B. Golding; D. Burgess; P. May; C. Pierce; J. Bally; A. Crook; A. Seed; D. Sills; L. Berry; R. Potts; I. Bell; N. Fox; E. Ebert; M. Eilts; K. O'Loughlin; R. Webb; R. Carbone; K. Browning; R. Roberts; C. Mueller

2003-08-01T23:59:59.000Z

435

Verification of Nowcasts from the WWRP Sydney 2000 Forecast Demonstration Project  

Science Conference Proceedings (OSTI)

The verification phase of the World Weather Research Programme (WWRP) Sydney 2000 Forecast Demonstration Project (FDP) was intended to measure the skill of the participating nowcast algorithms in predicting the location of convection, rainfall ...

Elizabeth E. Ebert; Laurence J. Wilson; Barbara G. Brown; Pertti Nurmi; Harold E. Brooks; John Bally; Matthias Jaeneke

2004-02-01T23:59:59.000Z

436

FCV Learning Demonstration: Project Midpoint Status and First-Generation Vehicle Results; Preprint  

DOE Green Energy (OSTI)

This paper covers the progress accomplished by the U.S. DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project since inception, including results from analysis of six months of new data.

Wipke, K.; Sprik, S.; Kurtz, J.; Thomas, H.; Garbak, J.

2007-12-01T23:59:59.000Z

437

Hydrogen Learning Demonstration Project: Fuel Cell Efficiency and Initial Durability (Presentation)  

Science Conference Proceedings (OSTI)

This presentation by NREL's Keith Wipke at the 2006 Fuel Cell Seminar provides information about the Hydrogen Learning Demonstration Project, with a focus on fuel cell efficiency and durability.

Wipke, K.; Welch, C.; Thomas, H.; Sprik, S.; Gronich, S.; Garbak, J.

2006-11-15T23:59:59.000Z

438

Baca geothermal demonstration project. Quarterly technical progress report, October 1-December 31, 1980  

SciTech Connect

Work completed on the Baca 50 Megawatt (MWe) Geothermal Demonstration Power Plant Project, Baca Location No. 1, New Mexico is reported. Topics covered in this quarterly report include progress made in the well and steam production systems, the power plant and transmission systems, and in the project data management program.

1981-03-01T23:59:59.000Z

439

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

440

Wabash River Coal Gasification Repowering Project Final Technical Report  

Office of Scientific and Technical Information (OSTI)

Wabash River Coal Gasification Wabash River Coal Gasification Repowering Project Final Technical Report August 2000 Work Performed Under Cooperative Agreement DE-FC21-92MC29310 For: The U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory Morgantown, West Virginia Prepared by: The Men and Women of Wabash River Energy Ltd. For Further Information Contact: Roy A. Dowd, CHMM Environmental Supervisor Wabash River Coal Gasification Repowering Project 444 West Sandford Avenue West Terre Haute, IN 47885 LEGAL NOTICE/DISCLAIMER This report was prepared by the Wabash River Coal Gasification Repowering Project Joint Venture pursuant to a Cooperative Agreement partially funded by the U.S. Department of Energy, and neither the Wabash River Coal Gasification Repowering

Note: This page contains sample records for the topic "demonstration project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Final Scientific Report - Wind Powering America State Outreach Project  

DOE Green Energy (OSTI)

The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

Sinclair, Mark; Margolis, Anne

2012-02-01T23:59:59.000Z

442

Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

Not Available

1994-06-14T23:59:59.000Z

443

Final Technical Report: Residential Fuel Cell Demonstration by the Delaware County Electric Cooperative, Inc.  

Science Conference Proceedings (OSTI)

This demonstration project contributes to the knowledge base in the area of fuel cells in stationary applications, propane fuel cells, edge-of-grid applications for fuel cells, and energy storage in combination with fuel cells. The project demonstrated that it is technically feasible to meet the whole-house electrical energy needs of a typical upstate New York residence with a 5-kW fuel cell in combination with in-home energy storage without any major modifications to the residence or modifications to the consumption patterns of the residents of the home. The use of a fuel cell at constant output power through a 120-Volt inverter leads to system performance issues including: • relatively poor power quality as quantified by the IEEE-defined short term flicker parameter • relatively low overall system efficiency Each of these issues is discussed in detail in the text of this report. The fuel cell performed well over the 1-year demonstration period in terms of availability and efficiency of conversion from chemical energy (propane) to electrical energy at the fuel cell output terminals. Another strength of fuel cell performance in the demonstration was the low requirements for maintenance and repair on the fuel cell. The project uncovered a new and important installation consideration for propane fuel cells. Alcohol added to new propane storage tanks is preferentially absorbed on the surface of some fuel cell reformer desulfurization filters. The experience on this project indicates that special attention must be paid to the volume and composition of propane tank additives. Size, composition, and replacement schedules for the de-sulfurization filter bed should be adjusted to account for propane tank additives to avoid sulfur poisoning of fuel cell stacks. Despite good overall technical performance of the fuel cell and the whole energy system, the demonstration showed that such a system is not economically feasible as compared to other commercially available technologies such as propane reciprocating engine generators.

Mark Hilson Schneider

2007-06-06T23:59:59.000Z

444

Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981  

DOE Green Energy (OSTI)

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Hanenburg, W.H.; Lacy, R.G.; Van De Mark, G.D.

1981-06-01T23:59:59.000Z

445

Heber geothermal binary demonstration project. Quarterly technical progress report, April 1, 1981-June 30, 1981  

SciTech Connect

Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1981, through June 30, 1981 is documented. Topics covered include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Van De Mark, G.D.

1981-09-01T23:59:59.000Z

446

Manhattan Project: The War Enters Its Final Phase, 1945  

Office of Scientific and Technical Information (OSTI)

American troops approaching the beach, D-Day, June 6, 1944. THE WAR ENTERS ITS FINAL PHASE American troops approaching the beach, D-Day, June 6, 1944. THE WAR ENTERS ITS FINAL PHASE (1945) Events > Dawn of the Atomic Era, 1945 The War Enters Its Final Phase, 1945 Debate Over How to Use the Bomb, Late Spring 1945 The Trinity Test, July 16, 1945 Safety and the Trinity Test, July 1945 Evaluations of Trinity, July 1945 Potsdam and the Final Decision to Bomb, July 1945 The Atomic Bombing of Hiroshima, August 6, 1945 The Atomic Bombing of Nagasaki, August 9, 1945 Japan Surrenders, August 10-15, 1945 The Manhattan Project and the Second World War, 1939-1945 Harry Truman being sworn in as president, April 12, 1945. On April 12, 1945, only weeks before Germany's unconditional surrender on May 7, President Franklin Roosevelt died suddenly in Warm Springs, Georgia. Vice President Harry S. Truman, a veteran of the United States Senate, was now president. Truman had not been privy to many of Roosevelt's internal policy deliberations and had to be briefed extensively in his first weeks in office. One of these briefings, provided by Secretary of War Henry Stimson on April 25, concerned S-1 (the Manhattan Project). Stimson, with Leslie Groves present during part of the meeting, traced the history of the Manhattan Project, summarized its status, and detailed the timetable for testing and combat delivery. Truman asked numerous questions during the forty-five minute meeting and made it clear that he understood the relevance of the atomic bomb to upcoming diplomatic and military initiatives.

447

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

448

DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drilling Projects Demonstrate Significant CO2 Storage Drilling Projects Demonstrate Significant CO2 Storage at Three Sites DOE-Sponsored Drilling Projects Demonstrate Significant CO2 Storage at Three Sites May 3, 2012 - 1:00pm Addthis Washington, DC - Evaluation-related test drilling at geologic sites in three states that could store a combined 64 million metric tons of carbon dioxide (CO2) emissions - an important component of carbon capture, utilization and storage (CCUS) technology development - has been completed in projects supported by the U.S. Department of Energy. If the potential of the sites is eventually fulfilled, they could safely and permanently store combined CO2 emissions equivalent to that produced by more than 11 million passenger vehicles annually or from the electricity use of more than 7 million homes for one year, according to Environmental

449

Expedited demonstration of molten salt mixed waste treatment technology. Final report  

Science Conference Proceedings (OSTI)

This final report discusses the molten salt mixed waste project in terms of the various subtasks established. Subtask 1: Carbon monoxide emissions; Establish a salt recycle schedule and/or a strategy for off-gas control for MWMF that keeps carbon monoxide emission below 100 ppm on an hourly averaged basis. Subtask 2: Salt melt viscosity; Experiments are conducted to determine salt viscosity as a function of ash composition, ash concentration, temperature, and time. Subtask 3: Determine that the amount of sodium carbonate entrained in the off-gas is minimal, and that any deposited salt can easily be removed form the piping using a soot blower or other means. Subtask 4: The provision of at least one final waste form that meets the waste acceptance criteria of a landfill that will take the waste. This report discusses the progress made in each of these areas.

NONE

1995-02-02T23:59:59.000Z

450

Reasons for the termination of, and DOE losses in, a geothermal demonstration powerplant project  

DOE Green Energy (OSTI)

The 50-megawatt Baca geothermal demonstration powerplant project, located in northern New Mexico, was the Department of Energy's (DOE's) initial effort to demonstrate geothermal powerplant technology. The project, started in 1978, was believed to have a high probability of success, and its cost was to be shared equally with the industry participants. GAO's review showed that the project was terminated in January 1982 because sufficient geothermal steam to operate the powerplant could not be obtained. The early termination resulted in DOE paying a disproportionate share - $45 million, or 64% - of the $70 million spent on the project because it had paid the majority of the powerplant-related costs at that time. However, a portion of these costs may be recovered through the sale of powerplant equipment. DOE indicated that it learned lessons from this experience and will act to prevent these problems from occurring on other projects.

Not Available

1983-09-29T23:59:59.000Z

451

Shared savings and low income homeowners: Results of a demonstration project in Hennepin County  

SciTech Connect

In 1984 Hennepin County, with financial support from the US Department of Energy and as part of the Year Five energy program of the Urban Consortium's Energy Task Force, initiated a Residential Shared Savings Demonstration Project (RSSDP) for single family homeowners. Shared savings, or performance contracting, occurs when an energy service company (ESCo) finances and installs energy improvements in a customer's property and receives a share of the savings that result over time as their compensation. Chapter 1 of this report provides general background on the project, including a brief description of Hennepin County, the energy environment within which the project was conducted, and the Residential Shared Savings Demonstration Project. Chapter 2 describes the efforts to market the RSSDP to low income homeowners, the results of those efforts and the findings from an extensive market assessment effort. Chapter 3 summarizes the significant lessons learned during the project. 4 figs., 3 tabs.

Miller, R.D.; Ford, J.M.

1986-04-01T23:59:59.000Z

452