  1. Navajo Electrification Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Future Plans * Navajo Electrification Demonstration Program -Video OBJECTIVES OBJECTIVES " ... Navajo Electrification Demonstration Navajo Electrification Demonstration Program Program ...

  2. Fuel Cell Demonstration Program

    SciTech Connect (OSTI)

    Gerald Brun

    2006-09-15

    In an effort to promote clean energy projects and aid in the commercialization of new fuel cell technologies the Long Island Power Authority (LIPA) initiated a Fuel Cell Demonstration Program in 1999 with six month deployments of Proton Exchange Membrane (PEM) non-commercial Beta model systems at partnering sites throughout Long Island. These projects facilitated significant developments in the technology, providing operating experience that allowed the manufacturer to produce fuel cells that were half the size of the Beta units and suitable for outdoor installations. In 2001, LIPA embarked on a large-scale effort to identify and develop measures that could improve the reliability and performance of future fuel cell technologies for electric utility applications and the concept to establish a fuel cell farm (Farm) of 75 units was developed. By the end of October of 2001, 75 Lorax 2.0 fuel cells had been installed at the West Babylon substation on Long Island, making it the first fuel cell demonstration of its kind and size anywhere in the world at the time. Designed to help LIPA study the feasibility of using fuel cells to operate in parallel with LIPA's electric grid system, the Farm operated 120 fuel cells over its lifetime of over 3 years including 3 generations of Plug Power fuel cells (Lorax 2.0, Lorax 3.0, Lorax 4.5). Of these 120 fuel cells, 20 Lorax 3.0 units operated under this Award from June 2002 to September 2004. In parallel with the operation of the Farm, LIPA recruited government and commercial/industrial customers to demonstrate fuel cells as on-site distributed generation. From December 2002 to February 2005, 17 fuel cells were tested and monitored at various customer sites throughout Long Island. The 37 fuel cells operated under this Award produced a total of 712,635 kWh. As fuel cell technology became more mature, performance improvements included a 1% increase in system efficiency. Including equipment, design, fuel, maintenance, installation

  3. Clean Coal Technology Demonstration Program

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy’s Clean Coal Technology Demonstration Program (1986-1993) laid the foundation for effective technologies now in use that have helped significantly lower emissions of sulfur dioxide (SO2), nitrogen oxides (NOx) and airborne particulates (PM10).

  4. Better Buildings Residential Program Solution Center Demonstration...

    Energy Savers [EERE]

    Residential Program Solution Center Demonstration Better Buildings Residential Program ... Residential Program Solution Center Demonstration from the U.S. Department of Energy. ...

  5. Propane Vehicle Demonstration Grant Program

    SciTech Connect (OSTI)

    Jack Mallinger

    2004-08-27

    Project Description: Propane Vehicle Demonstration Grants The Propane Vehicle Demonstration Grants was established to demonstrate the benefits of new propane equipment. The US Department of Energy, the Propane Education & Research Council (PERC) and the Propane Vehicle Council (PVC) partnered in this program. The project impacted ten different states, 179 vehicles, and 15 new propane fueling facilities. Based on estimates provided, this project generated a minimum of 1,441,000 new gallons of propane sold for the vehicle market annually. Additionally, two new off-road engines were brought to the market. Projects originally funded under this project were the City of Portland, Colorado, Kansas City, Impco Technologies, Jasper Engines, Maricopa County, New Jersey State, Port of Houston, Salt Lake City Newspaper, Suburban Propane, Mutual Liquid Propane and Ted Johnson.

  6. Better Buildings Residential Program Solution Center Demonstration...

    Office of Environmental Management (EM)

    Webinar Better Buildings Residential Program Solution Center Demonstration Webinar Demonstration webinar slides for Better Buildings Residential Program Solution Center, November 19, ...

  7. Site Programs & Cooperative Agreements: West Valley Demonstration...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Site Programs & Cooperative Agreements: West Valley Demonstration Project West Valley Demonstration Project The Seneca Nation of Indians has ...

  8. Better Buildings Residential Program Solution Center Demonstration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Residential Program Solution Center Demonstration Better Buildings Residential Program Solution Center Demonstration Better Buildings Residential Program Solution Center Demonstration from the U.S. Department of Energy. Solution Center Demo (2.8 MB) More Documents & Publications Building Science Solutions … Faster and Better Presentation: Better Buildings Residential Program Solution Center Presentation: Better Buildings Residential Program Solution Center

  9. Electric thermal storage demonstration program

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    In early 1989, MMWEC, a joint action agency comprised of 30 municipal light departments in Massachusetts and one affiliate in Rhode Island, responded to a Department of Energy request to proposal for the Least Cost Utility Planning program. The MMWEC submission was for the development of a program, focused on small rural electric utilities, to promote the use of electric thermal storage heating systems in residential applications. In this progress report, cost savings at Bolyston light department is discussed. (JL)

  10. Electric thermal storage demonstration program

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    In early 1989, MMWEC, a joint action agency comprised of 30 municipal light departments in Massachusetts and one affiliate in Rhode Island, responded to a Department of Energy request to proposal for the Least Cost Utility Planning program. The MMWEC submission was for the development of a program, focused on small rural electric utilities, to promote the use of electric thermal storage heating systems in residential applications. In this progress report, cost savings at Bolyston light department is discussed. (JL)

  11. HUD's Rental Assistance Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Digitally Engaged Communities: Helping Residents Get Online and Thrive Online Webinar Series sponsored by Housing and Urban Development, Department of Energy and Department of Education April 21, 2016 DIGITALLY ENGAGED COMMUNITIES: HELPING RESIDENTS GET ONLINE AND THRIVE ONLINE Amber Petty Ron Clewer Jada Johnson National Program Coordinator CEO Admin Services Assistant EveryoneOn Rockford Housing Little Rock Metro Housing amber@everyoneon.org rclewer@rockfordha.org jjohnson@mhapha.org * Welcome

  12. Clean Coal Technology Demonstration Program: Program Update 2000

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2001-04-01

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  13. Clean Coal Technology Demonstration Program: Program Update 1999

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2000-04-01

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  14. Clean Coal Technology Demonstration Program: Program Update 1998

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    1999-03-01

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  15. Clean Coal Technology Demonstration Program: Program Update 2001

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2002-07-30

    Annual report on the Clean Coal Technology Demonstration Program (CCT Program). The report address the role of the CCT Program, implementation, funding and costs, accomplishments, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results. Also includes Power Plant Improvement Initiative Projects.

  16. Think City Electric Vehicle Demonstration Program

    SciTech Connect (OSTI)

    Ford Motor Company

    2005-03-01

    The THINK city Electric Vehicle (EV) Demonstration Program Project, initiated late 2001, has been successfully completed as of April 2005. US. Partners include Federal, State and Municipal agencies as well as commercial partners. Phase I, consisting of placement of the vehicles in demonstration programs, was completed in 2002. Phase II, the monitoring of these programs was completed in 2004. Phase III, the decommissioning and/or exporting of vehicles concluded in 2005. Phase I--the Program successfully assigned 192 EV's with customers (including Hertz) in the state of California, 109 in New York (including loaner and demo vehicles), 16 in Georgia, 7 to customers outside of the US and 52 in Ford's internal operations in Dearborn Michigan for a total of 376 vehicles. The Program was the largest operating Urban EV Demonstration Project in the United States. Phase II--the monitoring of the operational fleet was ongoing and completed in 2004, and all vehicles were returned throughout 2004 and 2005. The Department of Energy (DOE) was involved with the monitoring of the New York Power Authority/THINK Clean Commute Program units through partnership with Electric Transportation Engineering Corporation (ETEC), which filed separate reports to DOE. The remainder of the field fleet was monitored through Ford's internal operations. Vehicles were retired from lease operation throughout the program for various operator reasons. Some of the vehicles were involved in re-leasing operations. At the end of the program, 376 vehicles had been involved, 372 of which were available for customer use while 4 were engineering prototype and study vehicles. Phase III--decommissioning and/or export of vehicles. In accordance with the NHTSA requirement, City vehicles could not remain in the United States past their three-year allowed program timeframe. At the end of leases, City vehicles have been decommissioned and/or exported to KamKorp in Norway.

  17. Clean Coal Technology Demonstration Program: Program update 1993

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Clean Coal Technology Demonstration Program (also referred to as the CCT Program) is a $6.9 billion cost-shared industry/government technology development effort. The program is to demonstrate a new generation of advanced coal-based technologies, with the most promising technologies being moved into the domestic and international marketplace. Technology has a vital role in ensuring that coal can continue to serve U.S. energy interests and enhance opportunities for economic growth and employment while meeting the national committment to a clean and healthy global environment. These technologies are being advanced through the CCT Program. The CCT Program supports three substantive national objectives: ensuring a sustainable environment through technology; enhancing energy efficiency and reliability; providing opportunities for economic growth and employment. The technologies being demonstrated under the CCT Program reduce the emissions of sulfur oxides, nitrogen oxides, greenhouse gases, hazardous air pollutants, solid and liquid wastes, and other emissions resulting from coal use or conversion to other fuel forms. These emissions reductions are achieved with efficiencies greater than or equal to currently available technologies.

  18. Sole Source Aquifer Demonstration Program | Open Energy Information

    Open Energy Info (EERE)

    Demonstration Program Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Sole Source Aquifer Demonstration ProgramLegal...

  19. Demonstration Home Program-San Diego | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration Home Program-San Diego Demonstration Home Program-San Diego Presents the California Center for Sustainable Energy's communications strategies for, challenges of, and ...

  20. Better Buildings Residential Program Solution Center Demonstration...

    Office of Environmental Management (EM)

    The Better Buildings Residential Program Solution Center is a robust online collection of ... Neighborhood Program partners, Home Performance with ENERGY STAR Sponsors, and others. ...

  1. Clean Coal Technology Demonstration Program. Program update 1994

    SciTech Connect (OSTI)

    1995-04-01

    The Clean Coal Technology Demonstration Program (CCT Program) is a $7.14 billion cost-shared industry/government technology development effort. The program is to demonstrate a new generation of advanced coal-based technologies, with the most promising technologies being moved into the domestic and international marketplace. Clean coal technologies being demonstrated under the CCT program are creating the technology base that allows the nation to meet its energy and environmental goals efficiently and reliably. The fact that most of the demonstrations are being conducted at commercial scale, in actual user environments, and under conditions typical of commercial operations allows the potential of the technologies to be evaluated in their intended commercial applications. The technologies are categorized into four market sectors: advanced electric power generation systems; environmental control devices; coal processing equipment for clean fuels; and industrial technologies. Sections of this report describe the following: Role of the Program; Program implementation; Funding and costs; The road to commercial realization; Results from completed projects; Results and accomplishments from ongoing projects; and Project fact sheets. Projects include fluidized-bed combustion, integrated gasification combined-cycle power plants, advanced combustion and heat engines, nitrogen oxide control technologies, sulfur dioxide control technologies, combined SO{sub 2} and NO{sub x} technologies, coal preparation techniques, mild gasification, and indirect liquefaction. Industrial applications include injection systems for blast furnaces, coke oven gas cleaning systems, power generation from coal/ore reduction, a cyclone combustor with S, N, and ash control, cement kiln flue gas scrubber, and pulse combustion for steam coal gasification.

  2. Better Buildings Residential Program Solution Center Demonstration Webinar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Webinar Better Buildings Residential Program Solution Center Demonstration Webinar Demonstration webinar slides for Better Buildings Residential Program Solution Center, November 19, 2014. Solution Center Demonstration Webinar Slides (3.8 MB) More Documents & Publications Presentation: Better Buildings Residential Program Solution Center Presentation: Better Buildings Residential Program Solution Center Better Buildings Residential Program Solution Center

  3. Clean coal technology demonstration program: Program update 1996-97

    SciTech Connect (OSTI)

    1997-10-01

    The Clean Coal Technology Demonstration Program (known as the CCT Program) reached a significant milestone in 1996 with the completion of 20 of the 39 active projects. The CCT Program is responding to a need to demonstrate and deploy a portfolio of technologies that will assure the U.S. recoverable coal reserves of 297 billion tons could continue to supply the nation`s energy needs economically and in a manner that meets the nation`s environmental objectives. This portfolio of technologies includes environmental control devices that contributed to meeting the accords on transboundary air pollution recommended by the Special Envoys on Acid Rain in 1986. Operational, technical, environmental, and economic performance information and data are now flowing from highly efficient, low-emission, advanced power generation technologies that will enable coal to retain its prominent role into the next millennium. Further, advanced technologies are emerging that will enhance the competitive use of coal in the industrial sector, such as in steelmaking. Coal processing technologies will enable the entire coal resource base to be used while complying with environmental requirements. These technologies are producing products used by utilities and industrial processes. The capability to coproduce products, such as liquid and solid fuels, electricity, and chemicals, is being demonstrated at a commercial scale by projects in the CCT Program. In summary, this portfolio of technologies is satisfying the national need to maintain a multifuel energy mix in which coal is a key component because of its low-cost, availability, and abundant supply within the nation`s borders.

  4. Better Buildings Residential Program Solution Center Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... edit Master title style Subscriptions - By Handbooks & Topic 26 Select when to receive emails: *Daily *Weekly Select resources by program component Select individual handbooks or ...

  5. Pecan Street Grid Demonstration Program (Technical Report) |...

    Office of Scientific and Technical Information (OSTI)

    Program signed-up over 1,000 participants who are sharing their home or businesses's electricity consumption data with the project via green button protocols, smart meters,...

  6. Geothermal Energy Research Development and Demonstration Program

    SciTech Connect (OSTI)

    Not Available

    1980-06-01

    The Federal program's goal, strategy, plans, and achievements are summarized. In addition, geothermal development by state and local governments and, where available, by the private sector is described. (MHR)

  7. Connecticut Fuel Cell Programs - From Demonstration to Deployment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut Fuel Cell Programs - From Demonstration to Deployment September 12, 2007 Lise ... Wind 7 Project 100 Onsite DG Company Development Demonstration Industry Infrastructure ...

  8. Heavy Truck Clean Diesel (HTCD) Program: 2007 Demonstration Truck |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Heavy Truck Clean Diesel (HTCD) Program: 2007 Demonstration Truck Heavy Truck Clean Diesel (HTCD) Program: 2007 Demonstration Truck 2003 DEER Conference Presentation: Caterpillar Incorporated 2003_deer_milam.pdf (10.59 MB) More Documents & Publications Transient Simulation of a 2007 Prototype Heavy-Duty Engine Diesel Aftertreatment Systems development Demonstration of a 50% Thermal Efficient Diesel Engine - Including HTCD Program Overview

  9. The California Demonstration Program for Control of PM from Diesel...

    Broader source: Energy.gov (indexed) [DOE]

    Conference Presentation: University of California at Riverside 2003deermiller.pdf (1.26 MB) More Documents & Publications The California Demonstration Program for Control of PM ...

  10. The California Demonstration Program for Control of PM from Diesel...

    Broader source: Energy.gov (indexed) [DOE]

    Conference Presentation: University of California, Riverside 2004deermiller.pdf (756.44 KB) More Documents & Publications The California Demonstration Program for Control of PM ...

  11. Cummins SuperTruck Program - Technology and System Level Demonstration...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Cummins SuperTruck Program - Technology and System Level Demonstration of Highly Efficient and Clean, Diesel Powered Class 8 Trucks Supertruck ...

  12. Recovery Act: Smart Grid Demonstration Program (SGDP) | Department...

    Energy Savers [EERE]

    Recovery Act: Smart Grid Demonstration Program (SGDP) View a Map Showing Energy Storage ... technologies, tools, techniques, and system configurations that significantly ...

  13. Clean Coal Technology Demonstration Program. Program update 1995

    SciTech Connect (OSTI)

    1996-04-01

    This document describes activities of the U.S. Clean Coal Technology Program for the time of 1985-1995. Various clean coal technologies are described.

  14. Connecticut Fuel Cell Programs - From Demonstration to Deployment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Programs - From Demonstration to Deployment Connecticut Fuel Cell Programs - From Demonstration to Deployment Presentation by the Connecticut Clean Energy Fund on Connecticut fuel cell programs. Presented September 12, 2007. doe_nha.pdf (1.05 MB) More Documents & Publications CESA-fuelcell-advancing-state-policies2010.pdf State of the States: Fuel Cells in America 2011 State of the States: Fuel Cells in America 2014

  15. Lessons learned from the HUD solar demonstration program

    SciTech Connect (OSTI)

    Moore, D.C.

    1981-01-01

    In the seven years since it was first authorized, the HUD residential solar heating and cooling demonstration program has provided funding support for over 600 demonstration projects. These projects provide the largest single data base of solar heating and cooling experience how available. Analysis of problems which have developed in the demonstration program has identified several areas where further research is necessary to assure that solar systems are both safe and workable.

  16. Alternative-fueled truck demonstration natural gas program: Caterpillar G3406LE development and demonstration

    SciTech Connect (OSTI)

    1995-06-01

    In 1990, the California Energy Commission, the South Coast Air Quality Management District, and the Southern California Gas Company joined together to sponsor the development and demonstration of compressed natural gas engines for Class 8 heavy-duty line-haul trucking applications. This program became part of an overall Alternative-Fueled Truck Demonstration Program, with the goal of advancing the technological development of alternative-fueled engines. The demonstration showed natural gas to be a technically viable fuel for Class 8 truck engines.

  17. EIS-0146: Programmatic for Clean Coal Technology Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    This programmatic environmental impact statement assesses the environmental impacts of continuing the Clean Coal Technology Demonstration Program involving the selection, for cost-shared federal funding, of one or more clean coal projects proposed by the private sector.

  18. West Valley Demonstration Project Transportation Emergency Management Program

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation Emergency Management Program Independent Oversight Review of the Office of Independent Oversight and Performance Assurance September 2000 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ................................................................... 1 1.0 INTRODUCTION ........................................................................... 4 2.0 RESULTS .........................................................................................

  19. DOE's Advanced Coal Research, Development, and Demonstration Program to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Develop Low-carbon Emission Coal Technologies | Department of Energy Advanced Coal Research, Development, and Demonstration Program to Develop Low-carbon Emission Coal Technologies DOE's Advanced Coal Research, Development, and Demonstration Program to Develop Low-carbon Emission Coal Technologies March 11, 2009 - 3:18pm Addthis Statement of Victor K. Der, Acting Assistant Secretary, Office of Fossil Energy before the Subcommittee on Energy and Environment, Committee on Science and

  20. Better Buildings Residential Program Solution Center Demonstration Webinar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transcript | Department of Energy Webinar Transcript Better Buildings Residential Program Solution Center Demonstration Webinar Transcript The Better Buildings Residential Program Solution Center is a robust online collection of nearly 1,000 examples, strategies, and resources from Better Buildings Neighborhood Program partners, Home Performance with ENERGY STAR® Sponsors, and others. This webinar presented on November 19, 2014 gives more information on the Solution Center. Solution Center

  1. Clean coal technologies: Research, development, and demonstration program plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

  2. Energy development and demonstration program: year-end report

    SciTech Connect (OSTI)

    Albright, B.

    1981-07-01

    The purpose of the Energy Development and Demonstration Program is to support projects for the development and demonstration of alternative energy sources available in Wisconsin and of energy conservation methods appropriate for Wisconsin. In September, eleven projects were selected for support in the program. Programs proposed include: monitoring an earth-sheltered dwelling; demonstrating a residential wood pellet eating system; energy management and control system on a dairy farm; three wind energy demonstrations; live-in solar collector; timber utilization project; continuous burn, induced-draft, condensing, modulating natural gas furnace; passive solar prototype for commercial-scale greenhouse; and high performance heat exchange device applied to fuel alcohol distillation processing. The benefits of the projects are briefly summarized. The location of the projects in Wisconsin is identified.

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Coordination

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  5. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  6. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Management

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  7. Cummins SuperTruck Program - Technology Demonstration of Highly Efficient

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean, Diesel Powered Class 8 Trucks | Department of Energy Demonstration of Highly Efficient Clean, Diesel Powered Class 8 Trucks Cummins SuperTruck Program - Technology Demonstration of Highly Efficient Clean, Diesel Powered Class 8 Trucks Low temperature combustion at part load combined with diffusion controlled combustion at higher loads, and robust control system dynamically adjusting engine operation, maximize engine efficiency while meeting tailpipe emissions standards

  8. Milliken Clean Coal Technology Demonstration Project. Project performance summary, Clean Coal Technology Demonstration Program

    SciTech Connect (OSTI)

    None, None

    2002-11-30

    The New York State Electric & Gas Corporation (NYSEG) demonstrated a combination of technologies at its Milliken Station in Lansing, New York, designed to: (1) achieve high sulfur dioxide (SO2) capture efficiency, (2) bring nitrogen oxide (NOx) emissions into compliance with Clean Air Act Amendments of 1990 (CAAA), (3) maintain high station efficiency, and (4) eliminate waste water discharge. This project is part of the U.S. Department of Energy?s (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advance coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of nine selected in January 1991 from 33 proposals submitted in response to the program?s fourth solicitation.

  9. 1994 Fernald field characterization demonstration program data report

    SciTech Connect (OSTI)

    Rautman, C.A.; Cromer, M.V.; Newman, G.C.; Beiso, D.A.

    1995-12-01

    The 1994 Fernald field characterization demonstration program, hosted by Fernald Environmental Management Project, was established to investigate technologies that are applicable to the characterization and remediation of soils contaminated with uranium. An important part of this effort was evaluating field-screening tools potentially capable of acquiring high-resolution information on uranium contamination distribution in surface soils. Further-more, the information needed to be obtained in a cost- and time-efficient manner. Seven advanced field-screening technologies were demonstrated at a uranium-contaminated site at Fernald, located 29 kilometers northwest of Cincinnati, Ohio. The seven technologies tested were: (1) alpha-track detectors, (2) a high-energy beta scintillometer, (3) electret ionization chambers, (4) and (5) two variants of gamma-ray spectrometry, (6) laser ablation-inductively coupled plasma-atomic emission spectroscopy, and (7) long-range alpha detection. The goals of this field demonstration were to evaluate the capabilities of the detectors and to demonstrate their utility within the US Department of Energy`s Environmental Restoration Program. Identical field studies were conducted using four industry-standard characterization tools: (1) a sodium-iodide scintillometer, (2) a low-energy FIDLER scintillometer, (3) a field-portable x-ray fluorescence detector, and (4) standard soil sampling coupled with laboratory analysis. Another important aspect of this program was the application of a cost/risk decision model to guide characterization of the site. This document is a compilation of raw data submitted by the technologies and converted total uranium data from the 1994 Fernald field characterization demonstration.

  10. Pecan Street Grid Demonstration Program. Final technology performance report

    SciTech Connect (OSTI)

    None, None

    2015-02-10

    This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol

  11. License renewal demonstration program: NRC observations and lessons learned

    SciTech Connect (OSTI)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff`s observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, {open_quotes}Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,{close_quotes} to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), {open_quotes}Requirements for Renewal of Operating Licenses for Nuclear Power Plants.{close_quotes} In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule.

  12. Cummins SuperTruck Program - Technology and System Level Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ace057koeberlein2012o.pdf (1.99

  13. Cummins SuperTruck Program - Technology and System Level Demonstration...

    Energy Savers [EERE]

    3 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ace057koeberlein2013o.pdf (3.18

  14. Fuel Cell Demonstration Program - Central and Remote Sites 2003

    SciTech Connect (OSTI)

    Gerald Brun

    2006-09-15

    In an effort to promote clean energy projects and aid in the commercialization of new fuel cell technologies, the Long Island Power Authority (LIPA) initiated a Fuel Cell Demonstration Program in 1999 with six month deployments of Proton Exchange Membrane (PEM) non-commercial Beta model systems at partnering sites throughout Long Island. These projects facilitated significant developments in the technology, providing operating experience that allowed the manufacturer to produce fuel cells that were half the size of the Beta units and suitable for outdoor installations. In 2001, LIPA embarked on a large-scale effort to identify and develop measures that could improve the reliability and performance of future fuel cell technologies for electric utility applications and the concept to establish a fuel cell farm (Farm) of 75 units was developed. By the end of October of 2001, 75 Lorax 2.0 fuel cells had been installed at the West Babylon substation on Long Island, making it the first fuel cell demonstration of its kind and size anywhere in the world at the time. Designed to help LIPA study the feasibility of using fuel cells to operate in parallel with LIPA's electric grid system, the Farm operated 120 fuel cells over its lifetime of over 3 years including 3 generations of Plug Power fuel cells (Lorax 2.0, Lorax 3.0, Lorax 4.5). Of these 120 fuel cells, 25 Lorax 4.5 units operated under this Award from April 2003 to December 2004. In parallel with the operation of the Farm, LIPA recruited government, commercial, and residential customers to demonstrate fuel cells as on-site distributed generation. The deployment of the 20 Lorax 4.5 units for the Remote Sites phase of the project began in October 2004. To date, 10 fuel cells have completed their demonstrations while 10 fuel cells are currently being monitored at various customer sites throughout Long Island. As of June 30, 2006 the 45 fuel cells operating under this Award produced a total of 1,585,093 kWh. As fuel cell

  15. Montana Integrated Carbon to Liquids (ICTL) Demonstration Program

    SciTech Connect (OSTI)

    Fiato, Rocco; Sharma, Ramesh; Allen, Mark; Peyton, Brent; Macur, Richard; Cameron, Jemima

    2013-09-30

    Integrated carbon-to-liquids technology (ICTL) incorporates three basic processes for the conversion of a wide range of feedstocks to distillate liquid fuels: (1) Direct Microcatalytic Coal Liquefaction (MCL) is coupled with biomass liquefaction via (2) Catalytic Hydrodeoxygenation and Isomerization (CHI) of fatty acid methyl esters (FAME) or trigylceride fatty acids (TGFA) to produce liquid fuels, with process derived (3) CO{sub 2} Capture and Utilization (CCU) via algae production and use in BioFertilizer for added terrestrial sequestration of CO{sub 2}, or as a feedstock for MCL and/or CHI. This novel approach enables synthetic fuels production while simultaneously meeting EISA 2007 Section 526 targets, minimizing land use and water consumption, and providing cost competitive fuels at current day petroleum prices. ICTL was demonstrated with Montana Crow sub-bituminous coal in MCL pilot scale operations at the Energy and Environmental Research Center at the University of North Dakota (EERC), with related pilot scale CHI studies conducted at the University of Pittsburgh Applied Research Center (PARC). Coal-Biomass to Liquid (CBTL) Fuel samples were evaluated at the US Air Force Research Labs (AFRL) in Dayton and greenhouse tests of algae based BioFertilizer conducted at Montana State University (MSU). Econometric modeling studies were also conducted on the use of algae based BioFertilizer in a wheat-camelina crop rotation cycle. We find that the combined operation is not only able to help boost crop yields, but also to provide added crop yields and associated profits from TGFA (from crop production) for use an ICTL plant feedstock. This program demonstrated the overall viability of ICTL in pilot scale operations. Related work on the Life Cycle Assessment (LCA) of a Montana project indicated that CCU could be employed very effectively to reduce the overall carbon footprint of the MCL/CHI process. Plans are currently being made to conduct larger-scale process

  16. Cummins SuperTruck Program - Technology Demonstration of Highly...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Supertruck technologies for 55% thermal efficiency and 68% freight efficiency Technology and System Level Demonstration of Highly Efficient and Clean, ...

  17. Heavy Truck Clean Diesel (HTCD) Program: 2007 Demonstration Truck...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Transient Simulation of a 2007 Prototype Heavy-Duty Engine Diesel Aftertreatment Systems development Demonstration of a 50% Thermal Efficient Diesel ...

  18. Voluntary Protection Program Onsite Review, West Valley Demonstration...

    Broader source: Energy.gov (indexed) [DOE]

    8 Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during...

  19. Fact Sheet: Vanadium Redox Battery Demonstration Program (August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The City of Painesville, OH, and its partners will demonstrate vanadium redox battery storage capacity at the 32 megawatt (MW), coal-fired Painesville Municipal Electric Plant ...

  20. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    none,

    2009-02-01

    This 2008 Multi-Year Research, Development, and Demonstration Program Plan covers the 2009-2015 period with program activities to 2025.

  1. Low-E Retrofit Demonstration and Educational Program

    SciTech Connect (OSTI)

    Culp, Thomas D; Wiehagen, Joseph; Drumheller, S Craig; Siegel, John; Stratmoen, Todd

    2013-11-16

    The objective of this project was to demonstrate the capability of low-emissivity (low-E) storm windows / panels and low-E retrofit glazing systems to significantly and cost effectively improve the energy efficiency of both existing residential and commercial buildings. The key outcomes are listed below: RESIDENTIAL CASE STUDIES: (a) A residential case study in two large multifamily apartment buildings in Philadelphia showed a substantial 18-22% reduction in heating energy use and a 9% reduction in cooling energy use by replacing old clear glass storm windows with modern low-E storm windows. Furthermore, the new low-E storm windows reduced the overall apartment air leakage by an average of 10%. (b) Air leakage testing on interior low-E panels installed in a New York City multifamily building over windows with and without AC units showed that the effective leakage area of the windows was reduced by 77-95%. (c) To study the use of low-E storm windows in a warmer mixed climate with a balance of both heating and cooling, 10 older homes near Atlanta with single pane windows were tested with three types of exterior storm windows: clear glass, low-E glass with high solar heat gain, and low-E glass with lower solar heat gain. The storm windows significantly reduced the overall home air leakage by an average of 17%, or 3.7 ACH50. Considerably high variability in the data made it difficult to draw strong conclusions about the overall energy usage, but for heating periods, the low-E storm windows showed approximately 15% heating energy savings, whereas clear storm windows were neutral in performance. For cooling periods, the low-E storm windows showed a wide range of performance from 2% to over 30% cooling energy savings. Overall, the study showed the potential for significantly more energy savings from using low-E glass versus no storm window or clear glass storm windows in warmer mixed climates, but it is difficult to conclusively say whether one type of low-E performed

  2. Cummins SuperTruck Program - Technology and System Level Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Objective 1: Engine Development Engine system demonstration of 50% or greater BTE in a test cell at an operating condition indicative of a vehicle traveling on a road at 65 mph. ...

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Systems Integration

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  5. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  6. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Executive Summary

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  7. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    SciTech Connect (OSTI)

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  8. Caterpillar MorElectric DOE Idle Reduction Demonstration Program

    SciTech Connect (OSTI)

    John Bernardi

    2007-09-30

    This project titled 'Demonstration of the New MorElectric{trademark} Technology as an Idle Reduction Solution' is one of four demonstration projects awarded by the US Department of Energy in 2002. The goal of these demonstration and evaluation projects was to gather objective in-use information on the performance of available idle reduction technologies by characterizing the cost; fuel, maintenance, and engine life savings; payback; and user impressions of various systems and techniques. In brief, the Caterpillar Inc. project involved applying electrically driven accessories for cab comfort during engine-off stops and for reducing fuel consumption during on-highway operation. Caterpillar had equipped and operated five new trucks with the technology in conjunction with International Truck and Engine Corporation and COX Transfer. The most significant result of the project was a demonstrated average idle reduction of 13.8% for the 5 truck MEI fleet over the control fleet. It should be noted that the control fleet trucks were also equipped with an idle reduction device that would start and stop the main engine automatically in order to maintain cab temperature. The control fleet idle usage would have been reduced by 3858 hours over the 2 year period with the MEI system installed, or approximately 2315 gallons of fuel less (calculations assume a fuel consumption of 0.6 gallons per hour for the 13 liter engine at idle). The fuel saved will be significantly larger for higher displacement engines without idle reduction equipment such as the engine auto start/stop device used by COX Transfer. It is common for engines to consume 1.0 gallons per hour which would increase the fuel savings to approximately 1260 gallons per truck per year of typical idling (1800 hours idle/yr).

  9. Early Site Permit Demonstration Program: Nuclear Power Plant Siting Database

    Energy Science and Technology Software Center (OSTI)

    1994-01-28

    This database is a repository of comprehensive licensing and technical reviews of siting regulatory processes and acceptance criteria for advanced light water reactor (ALWR) nuclear power plants. The program is designed to be used by applicants for an early site permit or combined construction permit/operating license (10CFRR522, Subparts A and C) as input for the development of the application. The database is a complete, menu-driven, self-contained package that can search and sort the supplied datamore » by topic, keyword, or other input. The software is designed for operation on IBM compatible computers with DOS.« less

  10. Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County

    SciTech Connect (OSTI)

    Robert C. Beiswanger, Jr.

    2010-05-20

    The purpose of the Daemen Alternative Energy/Geothermal Technologies Demonstration Project is to demonstrate the use of geothermal technology as model for energy and environmental efficiency in heating and cooling older, highly inefficient buildings. The former Marian Library building at Daemen College is a 19,000 square foot building located in the center of campus. Through this project, the building was equipped with geothermal technology and results were disseminated. Gold LEED certification for the building was awarded. 1) How the research adds to the understanding of the area investigated. This project is primarily a demonstration project. Information about the installation is available to other companies, organizations, and higher education institutions that may be interested in using geothermal energy for heating and cooling older buildings. 2) The technical effectiveness and economic feasibility of the methods or techniques investigated or demonstrated. According to the modeling and estimates through Stantec, the energy-efficiency cost savings is estimated at 20%, or $24,000 per year. Over 20 years this represents $480,000 in unrestricted revenue available for College operations. See attached technical assistance report. 3) How the project is otherwise of benefit to the public. The Daemen College Geothermal Technologies Ground Source Heat Pumps project sets a standard for retrofitting older, highly inefficient, energy wasting and environmentally irresponsible buildings?¢????quite typical of many of the buildings on the campuses of regional colleges and universities. As a model, the project serves as an energy-efficient system with significant environmental advantages. Information about the energy-efficiency measures is available to other colleges and universities, organizations and companies, students, and other interested parties. The installation and renovation provided employment for 120 individuals during the award period. Through the new Center

  11. DOE standard compliance demonstration program: An office building example

    SciTech Connect (OSTI)

    Bailey, S.A.; Keller, J.M.; Wrench, L.E.; Williams, C.J.

    1993-06-01

    The US Department of Energy (DOE) issued interim new building energy standards (10 CFR 435 1989) to achieve maximum energy efficiency in the designs of new buildings. DOE then entered into a project to demonstrate and assess the impact of these standards on the design community. One area of focus was a test to see how a less conventional design-focused building would meet the standards` requirements -- DOE wanted to demonstrate that compliance with energy standards does not mean compromising the architectural intent of a building. This study, which was initiated at Pacific Northwest Laboratory (PNL), illustrated the process by which compliance with the standards can be proven for a highly {open_quotes}design-oriented{close_quotes} office building. The study also assessed the impact of the whole building simulation compliance alternatives on design. This report documents the compliance requirements, gives a description of the sample building chosen for the study, provides general guidance for the compliance process, documents the method of compliance that was undertaken for the sample building, presents the results of the study, and provides a recommendation on how the compliance requirements could be improved to reflect more realistic use types.

  12. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 6.0 Program Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Multi-Year Research, Development and Demonstration Plan Page 6 - 1 6.0 Program Management and Operations The U.S. Department of Energy's (DOE's) Hydrogen and Fuel Cells Program (the Program) is composed of activities within the Offices of Energy Efficiency and Renewable Energy (EERE); Fossil Energy (FE); Nuclear Energy (NE); and Science (SC). EERE's Fuel Cell Technologies Program (FCT Program) represents the major component of this effort. The FCT Program Manager manages the

  13. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    N /A

    2009-04-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed to each of the facilities participating in the PDP. The PDP evaluates analyses of simulated headspace gases, constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  14. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    None, None

    2009-10-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single-blind audit samples are prepared and distributed to each of the facilities participating in the PDP. Different PDPs evaluate the analyses of simulated headspace gases (HSGs), constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  15. Early Site Permit Demonstration Program: Regulatory criteria evaluation report

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III.

  16. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    SciTech Connect (OSTI)

    Not Available

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  17. MHK Projects/NJBPU 1 5 MW Demonstration Program | Open Energy...

    Open Energy Info (EERE)

    NJBPU 1 5 MW Demonstration Program < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... "minzoom":false,"mappingservice":"googlemaps3",...

  18. Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites

    Broader source: Energy.gov [DOE]

    Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites (Waste Management...

  19. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2005-08-03

    The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the

  20. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2001-01-31

    The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP for boxed waste assay systems. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAOs). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the boxed waste PDP, a simulated waste container consists of a modified standard waste box (SWB) emplaced with radioactive standards and fabricated matrix inserts. An SWB is a waste box with ends designed specifically to fit the TRUPACT-II shipping container. SWBs will be used to package a substantial volume of the TRU waste for disposal. These PDP sample components

  1. The California Demonstration Program for Control of PM from Diesel Backup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generators (BUGs) | Department of Energy (BUGs) The California Demonstration Program for Control of PM from Diesel Backup Generators (BUGs) 2003 DEER Conference Presentation: University of California at Riverside 2003_deer_miller.pdf (1.26 MB) More Documents & Publications The California Demonstration Program for Control of PM from Diesel Backup Generators = Measuring "Real World" Heavy-Duty Diesel Emissions with a Mobile Lab Emissions from In-Use NG, Propane, and Diesel Fueled

  2. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Technologies Program 2009-2015 with program activities to 2025 Multi-Year Research, Development and Demonstration Plan Draft Clean, domestic, ubiquitous, renewable, baseload energy Cover Photo is Calpine's Sonoma Geothermal Plant at The Geysers feld in Northern California NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

  3. Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation. FY 1993 Program Summary

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    DOE has set a goal to clean up its complex and to bring all sites into compliance with applicable environmental regulations. This initiative is slated for completion by the year 2019. Four years ago there was no coordinated plan for identifying or cleaning these contaminated sites. Since 1989, DOE`s Office of Environmental Restoration and Waste Management has invested time, money, and manpower to establish a wide range of programs to meet this immense challenge. DOE is responsible for waste management and clean up of more than 100 contaminated installations in 36 states and territories. This includes 3,700 sites: over 26,000 acres, with hazardous or radioactive contaminated surface or groundwater, soil, or structures; over 26,000 acres requiring remediation, with the number growing as new sites are defined; 500 surplus facilities awaiting decontamination and decommissioning and approximately 5,000 peripheral properties (residences, businesses) that have soil contaminated with uranium tailings.

  4. Enterprise Assessments Review of the West Valley Demonstration Project Site Fire Protection Program … March 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the West Valley Demonstration Project Site Fire Protection Program March 2016 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  5. Freeze protection problems and experiences in the HUD solar residential demonstration program

    SciTech Connect (OSTI)

    Sparkes, H.R.; Raman, K.; Trivedi, J.

    1983-01-01

    The different kinds of freeze-up problems in solar energy systems are outlined, and methods of providing freeze protection are briefly discussed. These problems are illustrated by a few selected examples from the HUD Solar Residential Demonstration Program, which show the consequences and cost of freeze-up problems and the importance of protecting solar systems against them.

  6. Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program

    SciTech Connect (OSTI)

    Walker, S.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. This document describes the Environment, Safety, Health, and Quality requirements for conducting BWID activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to BWID operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program Plans, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and System and Performance audits as they apply to the BWID Program.

  7. Technology needs for remediation: Hanford and other DOE sites. Buried Waste Integrated Demonstration Program

    SciTech Connect (OSTI)

    Stapp, D.C.

    1993-01-01

    Technologies are being developed under the Buried Waste Integrated Demonstration (BWID) program to facilitate remediation of the US Department of Energy`s (DOE) buried and stored low-level radioactive, transuranic (TRU), and mixed radioactive and hazardous buried wastes. The BWID program is being coordinated by the Idaho National Engineering Laboratory (INEL) in southeastern Idaho, a DOE site that has large volumes of buried radioactive wastes. The program is currently focusing its efforts on the problems at INEL`s Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC). As specific technologies are successfully demonstrated, they will be available for transfer to applications at other DOE buried waste sites. The purpose of this study is to present buried waste technology needs that have been identified for DOE sites other than INEL.

  8. Maintenance of solar systems--Housing and urban development demonstration program

    SciTech Connect (OSTI)

    Freeborne, W.E.

    1983-06-01

    The Department of Housing and Urban Development (HUD) residential solar heating and cooling demonstration program provided funding support for over 600 solar projects. These projects provide the largest single data base of solar heating and cooling experience now available. These data suggest that maintenance and system operation have been mixed even though system configurations are similar throughout the program. HUD has been involved in the upgrading of one-third of the 600 solar projects and now can report that projects can be maintained with a more uniform level of effort.

  9. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 2.0: Program Benefits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benefits Multi-Year Research, Development and Demonstration Plan Page 2 - 1 2.0 Program Benefits Fuel cells provide power and heat cleanly and efficiently, using diverse domestic fuels, including hydrogen produced from renewable resources and biomass-based fuels. Fuel cells can be used in a wide range of stationary, transportation, and portable-power applications. Hydrogen can also function as an energy storage medium for renewable electricity. Hydrogen and fuel cell technologies are being

  10. Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

  11. Rio Grande Erosion Potential Demonstration - Report for the National Border Technology Program

    SciTech Connect (OSTI)

    JEPSEN, RICHARD A.; ROBERTS, JESSE D.; LANGFORD, RICHARD; GAILANI, JOSEPH

    2001-11-01

    This demonstration project is a collaboration among DOE, Sandia National Laboratories, the University of Texas, El Paso (UTEP), the International Boundary and Water Commission (IBWC), and the US Army Corps of Engineers (USACE). Sandia deployed and demonstrated a field measurement technology that enables the determination of erosion and transport potential of sediments in the Rio Grande. The technology deployed was the Mobile High Shear Stress Flume. This unique device was developed by Sandia's Carlsbad Programs for the USACE and has been used extensively in collaborative efforts on near shore and river systems throughout the United States. Since surface water quantity and quality along with human health is an important part of the National Border Technology Program, technologies that aid in characterizing, managing, and protecting this valuable resource from possible contamination sources is imperative.

  12. City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program

    SciTech Connect (OSTI)

    2013-12-31

    The City of Las Vegas was awarded Department of Energy (DOE) project funding in 2009, for the City of Las Vegas Plug-in Hybrid Electric Vehicle Demonstration Program. This project allowed the City of Las Vegas to purchase electric and plug-in hybrid electric vehicles and associated electric vehicle charging infrastructure. The City anticipated the electric vehicles having lower overall operating costs and emissions similar to traditional and hybrid vehicles.

  13. Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report

    Broader source: Energy.gov [DOE]

    The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States.

  14. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    SciTech Connect (OSTI)

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical--can continue in

  15. Design of Benign Matrix Drums for the Non-Destructive Assay Performance Demonstration Program for the National TRU Program

    SciTech Connect (OSTI)

    G. K. Becker

    2000-09-01

    Regulatory compliance programs associated with the Department of Energy Waste Isolation Pilot Plant Transuranic Waste characterization Program require the collection of waste characterization data of known quality to support repository performance assessment, permitting, and associated activities. Each facility is required to participate in performance demonstration programs (PDPs) designed to produce objective method performance data used to support compliance assessment activities. The PDP program is comprised of a series of tests conducted semi-annually at participating waste characterization facilities. Each semi-annual test if referred to as a cycle. Blind audit samples, referred to as PDP samples, are devices used in the NDA PDP program to acquire waste NDA system performance data per defined measurement routines. As defined under the current NDA PDP Program Plan, a PDP sample consists of a DOT 17C 55-gallon PDP matrix drum configured with insertable radioactive standards. The particular manner in which the matrix drum and PDP standards(s) are combined is a function of the waste NDA system performance test objectives of a given cycle. The purpose of this document is to define, per the PDP Program Plan, initial cycle benign matrix drum requirements, enumerate the associated specifications, and document the final as-built design. The intent of the initial cycle PDP is to establish and document the waste NDA baseline capability presently implemented at participating waste characterization facilities. The baseline can be interpreted as that fundamental waste NDA capability necessary to perform accurate source mass calibrations and demonstrate the ability to assay radioactive material of a pre-specified nominal isotopic/chemical composition in waste forms characterized as non-interfering to benign. A benign simulated waste matrix refers to a material that inherently does not possess or has minimal properties with attributes known to interfere with or complicate

  16. Environmental Compliance at the West Valley Demonstration Project: The Vitrification Permitting Program

    SciTech Connect (OSTI)

    L. C. Salvatori; C. B. Banzer; W. T. Watters

    1996-05-28

    The major environmental laws that apply to the West Valley Demonstration Project (WVDP) are the: Resource Conservation and Recovery Act (RCRA), Clean Air Act (CAA), Clean Water Act (CWA), Safe Drinking Water Act (SDWA), Toxic Substances Control Act (TSCA), National Environmental Policy Act (NEPA), and Emergency Planning and Community Right-To-Know Act (EPCRA). Regulations developed in accordance with these laws are administered by the New York State Department of Environmental Conservation (NYSDEC) and the U.S. Environmental Protection Agency (EPA) through state and federal programs, and regulatory requirements such as permitting. The Environmental Permits & Reports (EP&R) Group of the Environmental Affairs (EA) Department has the primary responsibility for developing a site-wide permitting program for the WVDP and obtaining the necessary permits. This report discusses the permits and the permitting process associated with the Vitrification Facility (VF).

  17. Spent nuclear fuel removal program at the West Valley Demonstration Project: Topical report

    SciTech Connect (OSTI)

    Connors, B. J.; Golden, M. P.; Valenti, P. J.; Winkel, J. J.

    1987-03-01

    The spent nuclear fuel removal program at the West Valley Demonstration Project (WVDP) consisted of removing the spent nuclear fuel (SNF) assemblies from the storage pool in the plant, loading them in shielded casks, and preparing the casks for transportation. So far, four fuel removal campaigns have been completed with the return of 625 spent nuclear fuel assemblies to their four utility owners. A fifth campaign, which is not yet completed, will transfer the remaining 125 fuel assemblies to a government site in Idaho. A spent fuel rod consolidation demonstration has been completed, and the storage canisters and their racks are being removed from the fuel receiving and storage pool to make way for installation of the size reduction equipment. A brief history of the West Valley reprocessing plant and the events leading to the storage and ownership of the spent nuclear fuel assemblies and their subsequent removal from West Valley are also recorded as background information. 3 refs., 16 figs., 9 tabs.

  18. Demonstrated performance of the TRW pressurized slagging coal combustor during the MHD POC program

    SciTech Connect (OSTI)

    Albright, J.; Bauer, M.; Braswell, R.; Grove, A.

    1994-12-31

    A prototypical 50 MW, pressurized slagging coal combustor has been designed, fabricated and tested as part of the MHD Integrated Topping Cycle (ITC) project. The MHD ITC project was an integral part of the MHD National Proof Of Concept (POC) program that was completed in September 1993. This technical paper presents the demonstrated performance of the MHD combustor which is an integral major component of the 50 MW, prototypical power train that was tested at the CDIF. The paper describes the design requirements and design criteria that formed the foundation for the combustor design. An overview of the resulting prototypical combustor design is included. A summary of all the POC tests that produced 525 hours of operating time is presented and the combustor operational characteristics and demonstrated performance are discussed with the focus being on conductivity (power), heat loss, slag recovery and lifetime projections. The prototypical combustion subsystem demonstrated the capability of meeting or exceeding the DOE Statement of Work performance requirements. A discussion of the impact of the new multipart coal injector on combustor performance is also included. The conclusions and recommendation include the recommended design changes required prior to scaling this design to larger sizes. Recommendations as to the remaining steps required to complete the combustor data base prior to scaling are also presented.

  19. Alternative fuels for vehicles fleet demonstration program. Final report, volume 2: Appendices

    SciTech Connect (OSTI)

    1997-06-01

    The Alternative Fuels for Vehicles Fleet Demonstration Program (AFV-FDP) was a multiyear effort to collect technical data for use in determining the costs and benefits of alternative-fuel vehicles (AFVs) in typical applications in New York State. This report, Volume 2, includes 13 appendices to Volume 1 that expand upon issues raised therein. Volume 1 provides: (1) Information about the purpose and scope of the AFV-FDP; (2) A summary of AFV-FDP findings organized on the basis of vehicle type and fuel type; (3) A short review of the status of AFV technology development, including examples of companies in the State that are active in developing AFVs and AFV components; and (4) A brief overview of the status of AFV deployment in the State. Volume 3 provides expanded reporting of AFV-FDP technical details, including the complete texts of the brochure Garage Guidelines for Alternative Fuels and the technical report Fleet Experience Survey Report, plus an extensive glossary of AFV terminology. The appendices cover a wide range of issues including: emissions regulations in New York State; production and health effects of ozone; vehicle emissions and control systems; emissions from heavy-duty engines; reformulated gasoline; greenhouse gases; production and characteristics of alternative fuels; the Energy Policy Act of 1992; the Clean Fuel Fleet Program; garage design guidelines for alternative fuels; surveys of fleet managers using alternative fuels; taxes on conventional and alternative fuels; and zero-emission vehicle technology.

  20. DOE complex buried waste characterization assessment. Buried Waste Integrated Demonstration Program

    SciTech Connect (OSTI)

    Kaae, P.S.; Holter, G.M.; Garrett, S.M.K.

    1993-01-01

    The work described in this report was conducted by Pacific Northwest Laboratory to provide information to the Buried Waste Integrated Demonstration (BWID) program. The information in this report is intended to provide a complex-wide planning base for th.e BWID to ensure that BWID activities are appropriately focused to address the range of remediation problems existing across the US Department of Energy (DOE) complex. This report contains information characterizing the 2.1 million m{sup 3} of buried and stored wastes and their associated sites at six major DOE facilities. Approximately 85% of this waste is low-level waste, with about 12% TRU or TRU mixed waste; the remaining 3% is low-level mixed waste. In addition, the report describes soil contamination sites across the complex. Some of the details that would be useful in further characterizing the buried wastes and contaminated soil sites across the DOE complex are either unavailable or difficult to locate. Several options for accessing this information and/or improving the information that is available are identified in the report. This document is a companion to Technology Needs for Remediation: Hanford and Other DOE Sites, PNL-8328 (Stapp 1993).

  1. Development and pilot demonstration program of a waste minimization plan at Argonne National Laboratory

    SciTech Connect (OSTI)

    Peters, R.W.; Wentz, C.A.; Thuot, J.R.

    1991-01-01

    In response to US Department of Energy directives, Argonne National Laboratory (ANL) has developed a waste minimization plan aimed at reducing the amount of wastes at this national research and development laboratory. Activities at ANL are primarily research- oriented and as such affect the amount and type of source reduction that can be achieved at this facility. The objective of ANL's waste minimization program is to cost-effectively reduce all types of wastes, including hazardous, mixed, radioactive, and nonhazardous wastes. The ANL Waste Minimization Plan uses a waste minimization audit as a systematic procedure to determine opportunities to reduce or eliminate waste. To facilitate these audits, a computerized bar-coding procedure is being implemented at ANL to track hazardous wastes from where they are generated to their ultimate disposal. This paper describes the development of the ANL Waste Minimization Plan and a pilot demonstration of the how the ANL Plan audited the hazardous waste generated within a selected divisions of ANL. It includes quantitative data on the generation and disposal of hazardous waste at ANL and describes potential ways to minimize hazardous wastes. 2 refs., 5 figs., 8 tabs.

  2. Alternative fuels for vehicles fleet demonstration program final report. Volume 1: Summary

    SciTech Connect (OSTI)

    1997-03-01

    The Alternative Fuels for Vehicles Fleet Demonstration Program (AFV-FDP) was a multiyear effort to collect technical data for use in determining the costs and benefits of alternative-fuel vehicles in typical applications in New York State. During 3 years of collecting data, 7.3 million miles of driving were accumulated, 1,003 chassis-dynamometer emissions tests were performed, 862,000 gallons of conventional fuel were saved, and unique information was developed about garage safety recommendations, vehicle performance, and other topics. Findings are organized by vehicle and fuel type. For light-duty compressed natural gas (CNG) vehicles, technology has evolved rapidly and closed-loop, electronically-controlled fuel systems provide performance and emissions advantages over open-loop, mechanical systems. The best CNG technology produces consistently low tailpipe emissions versus gasoline, and can eliminate evaporative emissions. Reduced driving range remains the largest physical drawback. Fuel cost is low ($/Btu) but capital costs are high, indicating that economics are best with vehicles that are used intensively. Propane produces impacts similar to CNG and is less expensive to implement, but fuel cost is higher than gasoline and safety codes limit use in urban areas. Light-duty methanol/ethanol vehicles provide performance and emissions benefits over gasoline with little impact on capital costs, but fuel costs are high. Heavy-duty CNG engines are evolving rapidly and provide large reductions in emissions versus diesel. Capital costs are high for CNG buses and fuel efficiency is reduced, but the fuel is less expensive and overall operating costs are about equal to those of diesel buses. Methanol buses provide performance and emissions benefits versus diesel, but fuel costs are high. Other emerging technologies were also evaluated, including electric vehicles, hybrid-electric vehicles, and fuel cells.

  3. Update on Progress of APBF-DEC EGR/DPF/SCR Demonstration Program at SwRI |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Progress of APBF-DEC EGR/DPF/SCR Demonstration Program at SwRI Update on Progress of APBF-DEC EGR/DPF/SCR Demonstration Program at SwRI 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: Southwest Research Institute 2004_deer_khair.pdf (264.85 KB) More Documents & Publications Final Update on APBF-DEC EGR/DPF/SCR Demonstration Project at SwRI Low Emissions Potential of EGR-SCR-DPF and Advanced Fuel Formulation - A Progress Report Low Emisssions

  4. Hydrogen, Fuel Cells and Infrastructure Technologies Program: Multiyear Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    Milliken, J.

    2007-10-01

    This plan includes goals, objectives, technical targets, tasks, and schedules for Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen Program.

  5. Cummins SuperTruck Program - Technology and System Level Demonstration of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Highly Efficient and Clean, Diesel Powered Class 8 Trucks | Department of Energy 3 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ace057_koeberlein_2013_o.pdf (3.18

  6. Cummins SuperTruck Program - Technology and System Level Demonstration of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Highly Efficient and Clean, Diesel Powered Class 8 Trucks | Department of Energy 2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ace057_koeberlein_2012_o.pdf (1.99

  7. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- June 2008

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  8. Voluntary Protection Program Onsite Review, West Valley Demonstration Project- November 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether West Valley Demonstration Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  9. Demonstration of a 50% Thermal Efficient Diesel Engine- Including HTCD Program Overview

    Broader source: Energy.gov [DOE]

    Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs.

  10. Commercialization strategy for the Department of Energy's Solar Buildings Demonstration Program

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    Efforts reported include: conducting a survey of existing commercial demonstration projects, categorizing these projects, determining criteria for evaluating the feasibility of continuing/aborting demonstration projects, and applying the criteria and making recommendations for which projects to continue and abort. It is recommended to refurbish 114 of the projects examined and to abandon 41. (LEW)

  11. The Clean Coal Technology Program 100 MWe demonstration of gas suspension absorption for flue gas desulfurization

    SciTech Connect (OSTI)

    Hsu, F.E.; Hedenhag, J.G.; Marchant, S.K.; Pukanic, G.W.; Norwood, V.M.; Burnett, T.A.

    1997-12-31

    AirPol Inc., with the cooperation of the Tennessee Valley Authority (TVA) under a Cooperative Agreement with the United States Department of Energy, installed and tested a 10 MWe Gas Suspension Absorption (GSA) Demonstration system at TVA`s Shawnee Fossil Plant near Paducah, Kentucky. This low-cost retrofit project demonstrated that the GSA system can remove more than 90% of the sulfur dioxide from high-sulfur coal-fired flue gas, while achieving a relatively high utilization of reagent lime. This paper presents a detailed technical description of the Clean Coal Technology demonstration project. Test results and data analysis from the preliminary testing, factorial tests, air toxics texts, 28-day continuous demonstration run of GSA/electrostatic precipitator (ESP), and 14-day continuous demonstration run of GSA/pulse jet baghouse (PJBH) are also discussed within this paper.

  12. NAS battery demonstration at American Electric Power:a study for the DOE energy storage program.

    SciTech Connect (OSTI)

    Newmiller, Jeff; Norris, Benjamin L. (Norris Energy Consulting Company, Martinez, CA); Peek, Georgianne Huff

    2006-03-01

    The first U.S. demonstration of the NGK sodium/sulfur battery technology was launched in August 2002 when a prototype system was installed at a commercial office building in Gahanna, Ohio. American Electric Power served as the host utility that provided the office space and technical support throughout the project. The system was used to both reduce demand peaks (peak-shaving operation) and to mitigate grid power disturbances (power quality operation) at the demonstration site. This report documents the results of the demonstration, provides an economic analysis of a commercial sodium/sulfur battery energy storage system at a typical site, and describes a side-by-side demonstration of the capabilities of the sodium/sulfur battery system, a lead-acid battery system, and a flywheel-based energy storage system in a power quality application.

  13. Update on Progress of APBF-DEC EGR/DPF/SCR Demonstration Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Update on APBF-DEC EGRDPFSCR Demonstration Project at SwRI Low Emissions Potential of EGR-SCR-DPF and Advanced Fuel Formulation - A Progress Report Low Emisssions Potential ...

  14. Microsoft PowerPoint - 2_FG2 scoping_DOE demonstration program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen 2.0 Jeff Hoffmann U.S. Department of Energy, Office of Major Demonstrations National Environmental Policy Act Public Scoping Meetings June 7-9, 2011 2 What is FutureGen ...

  15. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 3.6 Technology Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TECHNOLOGY VALIDATION SECTION Multi-Year Research, Development, and Demonstration Plan Page 3.6 - 1 3.6 Technology Validation The Technology Validation sub-program tests, demonstrates, and validates hydrogen (production, delivery, storage) and fuel cell systems and their integrated components in real- world environments. Feedback provided to the DOE hydrogen and fuel cell research and development (RD&D) projects, industry partners, and end users helps determine the additional RD&D

  16. Wildfire ignition resistant home design(WIRHD) program: Full-scale testing and demonstration final report.

    SciTech Connect (OSTI)

    Quarles, Stephen, L.; Sindelar, Melissa

    2011-12-13

    The primary goal of the Wildfire ignition resistant home design(WIRHD) program was to develop a home evaluation tool that could assess the ignition potential of a structure subjected to wildfire exposures. This report describes the tests that were conducted, summarizes the results, and discusses the implications of these results with regard to the vulnerabilities to homes and buildings.

  17. Wisconsin Power and Light Company's wind energy research and demonstration program

    SciTech Connect (OSTI)

    DeWinkel, C.C.

    1982-03-01

    Wisconsin Power and Light's (WPL) Wind Energy Test Program, encompasses the purchase and installation of six windmills which are or will be installed on customers' premises. These windmills (2 Windworks, 2 United Technologies, 1 Jay Carter and 1 Jacobs) vary in size from 10 to 20 Kilowatts (kw) with rotor diameters from 7 to 10 meters.

  18. EIS-0282: McIntosh Unit 4 TCFB Demonstration Project, Clean Coal Technology Program, Lakeland, Florida (also see EIS-0304)

    Broader source: Energy.gov [DOE]

    The proposed project, selected under DOE’s Clean Coal Technology Program, would demonstrate both Pressurized Circulating Fluidized Bed (PCFB) and Topped PCFB technologies. The proposed project would involve the construction and operation of a nominal 238 MWe (megawatts of electric power) combined-cycle power plant designed to burn a range of low- to high-sulfur coals.

  19. Cummins SuperTruck Program - Technology and System Level Demonstration of

    Broader source: Energy.gov (indexed) [DOE]

    County of Los Angeles - Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 OAS-RA-13-02 October 2012 Department of Energy Washington, DC 20585 October 9, 2012 MEMORANDUM FOR THE ASSISTANT SECRETARY, ENERGY EFFICIENCY AND RENEWABLE ENERGY FROM: Rickey R. Hass Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Examination Report on "County of Los Angeles - Energy Efficiency and

  20. The Ontario Hydro dry irradiated fuel storage program and concrete integrated container demonstration

    SciTech Connect (OSTI)

    Armstrong, P.J.; Grande, L. )

    1990-05-01

    The practicality of loading irradiated fuel into a concrete cask underwater in an existing pool facility has been successfully demonstrated. The cask holds about 7.7 metric-tons-uranium. Special design features allow the cask to be used for dry storage, for transportation, and for disposal without re-handling the fuel. The cask, called the concrete integrated container, or CIC, has been developed. This paper describes the loading, monitoring, and IAEA-based transportation certification of testing of the CIC.

  1. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Appendix E: Acronyms

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E - Acronyms Multi-Year Research, Development and Demonstration Plan Page E - 1 Appendix E - Acronyms AEI Advanced Energy Initiative AEO Annual Energy Outlook AFC Alkaline Fuel Cell AHJ Authorities Having Jurisdiction AMFC Alkaline Membrane Fuel Cells AMR Annual Merit Review ANL (DOE) Argonne National Laboratory APU Auxiliary Power Unit ARRA American Recovery and Reinvestment Act of 2009 ASES American Solar Energy Society ASME American Society of Mechanical Engineers AST Accelerated Stress Test

  2. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Executive Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Summary Multi-Year Research, Development and Demonstration Plan Page ES - 1 Executive Summary The United States pioneered the development of hydrogen and fuel cell technologies, and we continue to lead the way as these technologies emerge from the laboratory and into commercial markets. A tremendous opportunity exists for the United States to capitalize on this leadership role and apply these technologies to reducing greenhouse gas emissions, reducing our dependence on oil, and

  3. Pyrolysis Autoclave Technology Demonstration Program for Treatment of DOE Solidified Organic Wastes

    SciTech Connect (OSTI)

    Roesener, W.S.; Mason, J.B.; Ryan, K.; Bryson, S.; Eldredge, H.B.

    2006-07-01

    In the summer of 2005, MSE Technologies Applications, Inc. (MSE) and THOR Treatment Technologies, LLC (TTT) conducted a demonstration test of the Thermal Organic Reduction (THOR{sup sm}) in-drum pyrolysis autoclave system under contract to the Department of Energy. The purpose of the test was to demonstrate that the THOR{sup sm} pyrolysis autoclave system could successfully treat solidified organic waste to remove organics from the waste drums. The target waste was created at Rocky Flats and currently resides at the Radioactive Waste Management Complex (RWMC) at the Idaho National Laboratory (INL). Removing the organics from these drums would allow them to be shipped to the Waste Isolation Pilot Plant for disposal. Two drums of simulated organic setup waste were successfully treated. The simulated waste was virtually identical to the expected waste except for the absence of radioactive components. The simulated waste included carbon tetrachloride, trichloroethylene, perchloroethylene, Texaco Regal oil, and other organics mixed with calcium silicate and Portland cement stabilization agents. The two-stage process consisted of the THOR{sup sm} electrically heated pyrolysis autoclave followed by the MSE off gas treatment system. The treatment resulted in a final waste composition that meets the requirements for WIPP transportation and disposal. There were no detectable volatile organic compounds in the treated solid residues. The destruction and removal efficiency (DRE) for total organics in the two drums ranged from >99.999% to >99.9999%. The operation of the process proved to be easily controllable using the pyrolysis autoclave heaters. Complete treatment of a fully loaded surrogate waste drum including heat-up and cooldown took place over a two-day period. This paper discusses the results of the successful pyrolysis autoclave demonstration testing. (authors)

  4. Microsoft PowerPoint - 2_FG2 scoping_DOE demonstration program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen 2.0 Jeff Hoffmann U.S. Department of Energy, Office of Major Demonstrations National Environmental Policy Act Public Scoping Meetings June 7-9, 2011 2 What is FutureGen 2.0? * U.S. DOE has awarded $1.05 Billion: - $590 million to Ameren, Babcock & Wilcox and American Air Liquide to test oxy-combustion technology at utility-scale - $459 million to FutureGen Alliance to transport and geologically store the CO 2 - Approximately $1.3B total project value including private cost share *

  5. Utility Advanced Turbine Systems Program (ATS) Technical Readiness Testing and Pre-Commercial Demonstration

    SciTech Connect (OSTI)

    Siemens Westinghouse

    2000-12-31

    The objective of the ATS program is to develop ultra-high efficiency, environmentally superior and cost competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Specific performance targets have been set using natural gas as the primary fuel: {lg_bullet} System efficiency that will exceed 60%(lower heating value basis) on natural gas for large scale utility turbine systems; for industrial applications, systems that will result in a 15% improvement in heat rate compared to currently available gas turbine systems. {lg_bullet} An environmentally superior system that will not require the use of post combustion emissions controls under full load operating conditions. {lg_bullet} Busbar energy costs that are 10% less than current state-of-the-art turbine systems, while meeting the same environmental requirements. {lg_bullet} Fuel-flexible designs that will operate on natural gas but are capable of being adapted to operate on coal-derived or biomass fuels. {lg_bullet} Reliability-Availability-Maintainability (RAM) that is equivalent to the current turbine systems. {lg_bullet} Water consumption minimized to levels consistent with cost and efficiency goals. {lg_bullet} Commercial systems that will enter the market in the year 2000. In Phase I of the ATS program, Siemens Westinghouse found that efficiency significantly increases when the traditional combined-cycle power plant is reconfigured with closed-loop steam cooling of the hot gas path. Phase II activities involved the development of a 318MW natural gas fired turbine conceptual design with the flexibility to burn coal-derived and biomass fuels. Phases I and II of the ATS program have been completed. Phase III, the current phase, completes the research and development activities and develops hardware specifications from the Phase II conceptual design. This report summarizes Phase III extension activities for a three month period. Additional details may be

  6. Utility Advanced Turbine Systems Program (ATS) Technical Readiness Testing and Pre-Commercial Demonstration

    SciTech Connect (OSTI)

    Siemens Westinghouse

    2001-09-30

    The objective of the ATS program is to develop ultra-high efficiency, environmentally superior and cost competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Specific performance targets have been set using natural gas as the primary fuel: (1) System efficiency that will exceed 60% (lower heating value basis) on natural gas for large scale utility turbine systems; for industrial applications, systems that will result in a 15% improvement in heat rate compared to currently available gas turbine systems. (2) An environmentally superior system that will not require the use of post combustion emissions controls under full load operating conditions. (3) Busbar energy costs that are 10% less than current state-of-the-art turbine systems, while meeting the same environmental requirements. (4) Fuel-flexible designs that will operate on natural gas but are capable of being adapted to operate on coal-derived or biomass fuels. (5) Reliability-Availability-Maintainability (RAM) that is equivalent to the current turbine systems. (6) Water consumption minimized to levels consistent with cost and efficiency goals. (7) Commercial systems that will enter the market in the year 2000. In Phase I of the ATS program, Siemens Westinghouse found that efficiency significantly increases when the traditional combined-cycle power plant is reconfigured with closed-loop steam cooling of the hot gas path. Phase II activities involved the development of a 318MW natural gas fired turbine conceptual design with the flexibility to burn coal-derived and biomass fuels. Phases I and II of the ATS program have been completed. Phase III, the current phase, completes the research and development activities and develops hardware specifications from the Phase II conceptual design. This report summarizes Phase III Extension activities for a three month period. Additional details may be found in monthly technical progress reports covering the

  7. Stirling Engine Natural Gas Combustion Demonstration Program. Final report, October 1989-January 1991

    SciTech Connect (OSTI)

    Ernst, W.; Moryl, J.; Riecke, G.

    1991-02-01

    Fueled on natural gas, the Stirling engine is an inherently clean, quiet, and efficient engine. With increasing environmental concern for air quality and the increasingly more stringent requirements for low engine exhaust emissions, the Stirling engine may be an attractive alternative to internal combustion (IC) engines. The study has demonstrated that ultra low emissions can be attained with a Stirling-engine-driven electric generator configured to burn natural gas. Combustion parameters were optimized to produce the lowest possible exhaust emissions for a flame-type combustor without compromising overall engine thermal efficiency. A market application survey and manufacturing cost analysis indicate that a market opportunity potentially exists in the volumes needed to economically manufacture a newly designed Stirling engine (Mod III) for stationary applications and hybrid vehicles. The translation of such potential markets into actual markets does, however, pose difficult challenges as substantial investments are required. Also, the general acceptance of a new engine type by purchasers requires a considerable amount of time.

  8. The U.S. Department of Energy`s integrated gasification combined cycle research, development and demonstration program

    SciTech Connect (OSTI)

    Brdar, R.D.; Cicero, D.C.

    1996-07-01

    Historically, coal has played a major role as a fuel source for power generation both domestically and abroad. Despite increasingly stringent environmental constraints and affordable natural gas, coal will remain one of the primary fuels for producing electricity. This is due to its abundance throughout the world, low price, ease of transport an export, decreasing capital cost for coal-based systems, and the need to maintain fuel diversity. Recognizing the role coal will continue to play, the US Department of Energy (DOE) is working in partnership with industry to develop ways to use this abundant fuel resource in a manner that is more economical, more efficient and environmentally superior to conventional means to burn coal. The most promising of these technologies is integrated gasification combined cycle (IGCC) systems. Although IGCC systems offer many advantages, there are still several hurdles that must be overcome before the technology achieves widespread commercial acceptance. The major hurdles to commercialization include reducing capital and operating costs, reducing technical risk, demonstrating environmental and technical performance at commercial scale, and demonstrating system reliability and operability. Overcoming these hurdles, as well as continued progress in improving system efficiency, are the goals of the DOE IGCC research, development and demonstrate (RD and D) program. This paper provides an overview of this integrated RD and D program and describes fundamental areas of technology development, key research projects and their related demonstration scale activities.

  9. Cummins SuperTruck Program Technology and System Level Demonstration of Highly Efficient and Clean, Diesel Powered Class 8 Trucks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovation You Can Depend On David Koeberlein- Principal Investigator Cummins Inc. Cummins SuperTruck Program Technology and System Level Demonstration of Highly Efficient and Clean, Diesel Powered Class 8 Trucks June 20, 2014 This presentation does not contain any proprietary, confidential, or otherwise restricted information Project ID: ACE057 Innovation You Can Depend On Overview Budget: * Total: $77,662,230 * DoE share* $36,335,608 * CMI share* $36,335,608 * actuals as of 12/31/2013 Today

  10. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE`s goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD`s RDDT and E.

  11. Report for the ASC CSSE L2 Milestone (4873) - Demonstration of Local Failure Local Recovery Resilient Programming Model.

    SciTech Connect (OSTI)

    Heroux, Michael A.; Teranishi, Keita

    2014-06-01

    Recovery from process loss during the execution of a distributed memory parallel application is presently achieved by restarting the program, typically from a checkpoint file. Future computer system trends indicate that the size of data to checkpoint, the lack of improvement in parallel file system performance and the increase in process failure rates will lead to situations where checkpoint restart becomes infeasible. In this report we describe and prototype the use of a new application level resilient computing model that manages persistent storage of local state for each process such that, if a process fails, recovery can be performed locally without requiring access to a global checkpoint file. LFLR provides application developers with an ability to recover locally and continue application execution when a process is lost. This report discusses what features are required from the hardware, OS and runtime layers, and what approaches application developers might use in the design of future codes, including a demonstration of LFLR-enabled MiniFE code from the Matenvo mini-application suite.

  12. Demonstration & Market Transformation

    Broader source: Energy.gov (indexed) [DOE]

    Demonstration & Market Transformation Peer Review Break-Out Presentation Jim Spaeth Program Manager Demonstration & Market Transformation March 23, 2015 2 | Bioenergy Technologies ...

  13. Vehicle Technologies Office Merit Review 2016: Plug-In Hybrid Electric Vehicle Demonstration Program and Social Media Campaign

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by ASG Renaissance at the 2016 DOE Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting about Technology Integration

  14. Office of Technology Development`s Research, Development, Demonstration, Testing and Evaluation Mid-Year Program Review. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This document, Volume 2, presents brief summaries of programs being investigated at USDOE sites for waste processing, remedial action, underground storage tank remediation, and robotic applications in waste management.

  15. Vehicle Technologies Office Merit Review 2015: Plug-In Hybrid Medium-Duty Truck Demonstration and Evaluation Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by SCAQMD at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about plug-in hybrid medium-duty truck...

  16. Strategic Defense Initiative Demonstration/Validation program environmental assessment. Battle management/command, control, and communications (BM/C3)

    SciTech Connect (OSTI)

    Brown, G.

    1987-08-01

    The Strategic Defense Initiative Organization (SDIO) and its proponents (U.S. Army and U.S. Air Force) plan to conduct Demonstration/Validation tests of the BM/C3 technology. These tests will demonstrate the ability of the technology to perform the required tasks, and will validate a future decision on whether to proceed with Full-Scale Development. Demonstration/Validation tests would be conducted at the Advanced Research Center, Electronic Systems Division, National Test Facility, Rome Air Development Center, Nevada Test Site, Harry Diamond Laboratories, and at contractor facilities. Tests would include analyses, simulations, and component/assembly tests. This document addresses the potential environmental consequences of the Demonstration/Validation testing of the BM/C3 technology.

  17. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 1.0: Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction Multi-Year Research, Development and Demonstration Plan Page 1 - 1 Multi-Year Research, Development and Demonstration Plan Page 1 - 1 1.0 Introduction The U. S. Department of Energy's (DOE's or the Department's) hydrogen and fuel cell efforts are part of a broad portfolio of activities to build a competitive and sustainable clean energy economy to secure the nation's energy future. Reducing greenhouse gas emissions 80 percent by 2050 1 and eliminating dependence on imported fuel

  18. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 3.8 Education and Outreach

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Education and Outreach Multi-Year Research, Development and Demonstration Plan Page 3.8 - 1 3.8 Education and Outreach Expanding the role of hydrogen and fuel cell technologies as an integral part of the Nation's energy portfolio requires sustained education and outreach efforts. Increased efforts are required to facilitate near-term demonstration projects and early market fuel cell and hydrogen infrastructure installations, to increase public awareness and understanding, and to lower barriers

  19. Demonstration of the BNL Continuous Dual Trap Analyzer to Detect Perfluorocarbon Tracers for the Tag, Track and Location Program

    SciTech Connect (OSTI)

    Heiser,J.H.; Adams, J.; Dietz, R..; Milian, L.; Watson, T.

    2008-10-07

    The Tag, Track and Location System (TTL) Program is investigating methods of tracking an asset using perfluorocarbon tracers (PFT). The success of any TTL method requires sound detection/location instrumentation. Tracer Detection Technologies Corp (TDT), through a contract with the Office of Naval Research (ONR), is investigating different detection systems. The detections systems generally fall into two categories; proximity detectors and standoff detectors. Proximity detectors, as the name implies, need to be in close proximity (e.g., meter to 10's of meters) to the PFT source. Standoff detection searches for the PFT from a greater distance away from the source (e.g., 100's of meters to kilometers). Gas Chromatographs (GC) are generally considered a proximity detection systems, but in the case of PFTs should be considered for both proximity and standoff detection with the caveat that in standoff use the GC needs to be somewhere in the PFT plume, i.e., generally downwind of the source. With a properly sized PFT source, the right GC can afford fairly large standoff (distance from the source) distances; 100's of meters to kilometers downwind. Brookhaven National Laboratory (BNL) has such a GC system and offered to demonstrate the CDTA for TTL as a no cost addition to the TDTTTL project, of which BNL was a participant. BNL is a leading authority on the sampling, collection, release and detection of PFTs. In addition, the BNL team has extensive background in atmospheric dispersion, the application of PFTs to such studies and the development of applications utilizing PFTs such as building infiltration measurements, control room integrity determination, leak location and environmental investigations. This experience and expertise is essential in developing any PFT application were dispersion, dilution and overcoming environmental conditions and interferences are integral to success. BNL has developed sophisticated gas chromatography methods and instruments that allow

  20. EIS-0049: Geothermal Demonstration Program 50-MW Power Plant-Baca Ranch, Sandoval and Rio Arriba Counties, New Mexico

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) developed this EIS to evaluate the environmental impacts of joint funding by DOE and commercial partners of a 50-megawatt demonstration geothermal power plant at the Baca Location in Sandoval County, New Mexico, including construction of the geothermal well field and transmission line.

  1. Program management plan for development, demonstration, testing, and evaluation efforts associated with Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

    SciTech Connect (OSTI)

    Conley, T.B.

    1994-04-01

    This program management plan covers the development, demonstration, testing, and evaluation efforts necessary to identify treatment methods for all the waste listed in Appendix B of the ORR`s LDR/FFCA as well as any new wastes which meet Appendix B criteria. To successfully identify a treatment method, at least a proof-of-principle level of understanding must be obtained: that is, the candidate processes must be demonstrated as effective in treating the wastes to the LDR; however, an optimized process is not required. Where applicable and deemed necessary and where the budgets will support them, pilot-scale demonstrations will be pursued. The overall strategy being adopted in this program will be composed of the following activities: Scoping of the study; characterization; development and screening of alternatives; treatability investigations; and detailed analysis of alternatives.

  2. Light Water Reactor Sustainability Program Risk Informed Safety Margin Characterization (RISMC) Advanced Test Reactor Demonstration Case Study

    SciTech Connect (OSTI)

    Curtis Smith; David Schwieder; Cherie Phelan; Anh Bui; Paul Bayless

    2012-08-01

    Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). Consequently, the ability to better characterize and quantify safety margin holds the key to improved decision making about LWR design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margins management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. The purpose of the RISMC Pathway R&D is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced “RISMC toolkit” that enables more accurate representation of NPP safety margin. This report describes the RISMC methodology demonstration where the Advanced Test Reactor (ATR) was used as a test-bed for purposes of determining safety margins. As part of the demonstration, we describe how both the thermal-hydraulics and probabilistic safety calculations are integrated and used to quantify margin management strategies.

  3. Utility Advanced Turbine Systems program (ATS) technical readiness testing and pre-commercial demonstration. First quarterly report, 1997

    SciTech Connect (OSTI)

    Brushwood, J.

    1997-09-01

    The objective of the ATS program is to develop ultra-high efficiency, environmentally-superior and cost competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Specific performance targets have been set using natural gas as the primary fuel: (1) System efficiency that will exceed 60% (lower heating value basis) on natural gas for large scale utility turbine systems; for industrial applications, systems that will result in a 15% improvement in heat rate compared to currently available gas turbine systems. (2) An environmentally superior system that will not require the use of post combustion emissions controls under full load operating conditions. (3) Busbar energy costs that are 10% less than current state-of-the-art turbine systems, while meeting the same environmental requirements. (4) Fuel-flexible designs that will operate on natural gas but are capable of being adapted to operate on coal-derived or biomass fuels. (5) Reliability- Availability-Maintainability (RAM) that is equivalent to the current turbine systems. (6) Water consumption minimized to levels consistent with cost and efficiency goals. (7) Commercial systems that will enter the market in the year 2000. In Phase 1 of the ATS program, Westinghouse found that efficiency significantly increases when the traditional combined-cycle power plant is re-configured with closed- loop steam cooling of the hot gas path. Phase II activities involved the development of a 318MW natural gas fired turbine conceptual design with the flexibility to bum coal-derived and biomass fuels. Phases I and II of the ATS program have been completed. Phase III, the current phase, completes the research and development activities and develops hardware specifications from the Phase II conceptual design. Future Phase IV activities consist of manufacturing, constructing,

  4. Office of Technology Development FY 1993 program summary: Office of Research and Development, Office of Demonstration, Testing and Evaluation. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs are discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.

  5. Demonstration & Deployment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration & Deployment Plenary Presentation Brian Duff May 20, 2013 2 | Bioenergy Technologies Office Demonstration & Deployment Peer Review Plenary * Introduction to the ...

  6. Evaluation of the proposed pilot groundwater pump and treat demonstration for the Paducah Gaseous Diffusion Plant. Environmental Restoration Program

    SciTech Connect (OSTI)

    Bodenstein, G.W.; Bonczek, R.R.; Early, T.O.; Hale, T.B.; Huff, D.D.; Nickelson, M.D.; Rightmire, C.T.

    1992-11-01

    This report contains the evaluation and recommendations of a Groundwater Corrective Actions Review Team. The primary goal is to evaluate the technical merit of and the need to implement a proposed groundwater pump-and-treat demonstration project for the Northwest contaminant plume at Paducah, Kentucky. A key distinction recognized by the review team is that the proposed project is intended to be a full-scale hydraulic containment of contaminants migrating from the sources of the plume, not plume remediation. The key questions incorporated into this plan are whether (1) dense, nonaqueous-phase liquids (DNAPLS) are present in the Regional Gravel Aquifer (RGA) at the source of the plume and (2) {sup 99}Tc removal must be included as part of any groundwater treatment process. The first question cannot be answered until the contaminant sources are better defined; the second question requires further risk assessment and/or a policy decision by DOE. Technical evaluation by the review team suggests that the recommended course of action be to modify the proposed work plan to include accurate identification of the sources of contaminants and vertical distribution of contaminants within the Northwest plume before a decision is made on the preferred source-control option. If DNAPLs are not present in the RGA, removal or containment of the sources is recommended. If DNAPLs are present, then hydraulic containment will be required. Finally, the review team recognizes that it is necessary to initiate a more comprehensive analysis of sitewide remediation needs to create links between action taken for the Northwest plume and action taken for other contamination sites at PGPD.

  7. SEAMIST{trademark} in-situ instrumentation and vapor sampling system applications in the Sandia Mixed Waste Landfill Integrated Demonstration program: Final report

    SciTech Connect (OSTI)

    Williams, C.; Lowry, W.; Cremer, D.; Dunn, S.D.

    1995-09-01

    The Mixed Waste Landfill Integrated Demonstration was tasked with demonstrating innovative technologies for the cleanup of chemical and mixed waste landfills that are representive of sites occurring throughout the DOE complex and the nation. The SEAMIST{trademark} inverting membrane deployment system has been used successfully at the Mixed Waste Landfill Integrated Demonstration (MWLID) for multipoint vapor sampling, pressure measurement, permeability measurement, sensor integration demonstrations, and borehole lining. Several instruments were deployed inside the SEAMIST{trademark}-lined boreholes to detect metals, radionuclides, moisture, and geologic variations. The liner protected the instruments from contamination, maintained support of the uncased borehole wall, and sealed the total borehole from air circulation. Recent activities included the installation of three multipoint vapor sampling systems and sensor integration systems in 100-foot-deep vertical boreholes. A long term pressure monitoring program has recorded barometric pressure effects at depth with relatively high spatial resolution. The SEAMIST{trademark} system has been integrated with a variety of hydrologic and chemical sensors for in-situ measurements, demonstrating its versatility as an instrument deployment system that allows easy emplacement and removal. Standard SEAMIST{trademark} vapor sampling systems were also integrated with state-of-the-art volatile organic compound analysis technologies. The results and status of these demonstration tests are presented.

  8. HUD's Rental Assistance Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Staying Warm & Saving Energy this Winter Webinar Series sponsored by Housing and Urban Development, Department of Energy and Department of Education December 17, 2015  Welcome and intro to webinar series  Introduction of presenter, Madeline Salzman  Resident Engagement Toolkit overview  Building knowledge  Changing behavior  Inspiring social change  Q & A You are on mute! Use your webinar bar to fill out poll or chat to send in a question. Email

  9. HUD's Rental Assistance Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Webinar Series sponsored by Housing and Urban Development, ... SEED: Coalitions for Community Growth Madeline Salzman SEED ... 4-25: Coloring Sheets for Children - Lighting Exhibit ...

  10. HUD's Rental Assistance Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Questionnaire Staff Commitment and Resident Awareness ... Bill How Much Electricity do I Use? "Switch-a-bulb" during annual unit inspections Point-of-use ...

  11. DOD fuel cell demonstration program

    SciTech Connect (OSTI)

    Holcomb, F.H.; Binder, M.J.; Taylor, W.R.

    1996-12-31

    The supply of reliable, cost-effective electric power with minimal environmental impact is a constant concern of Department of Defense (DOD) installation energy personnel. Electricity purchased from the local utility is expensive and represents only about 30% of the original energy input at the generating station due to generation and distribution inefficiencies. Because of master metering and large air conditioning loads, the demand portion of the installation`s electric bill can be in excess of 50% of the total bill. While the electric utilities in the United States have a very good record of reliability, there is significant potential for improving the security of electrical power supplied by using on-site power generation. On-site, dispersed power generation can reduce power outages due to weather, terrorist activities, or lack of utility generating capacity. In addition, as increased emphasis is placed on global warming, acid rain, and air pollution in general, the development of clean, highly efficient power producing technologies is not only desirable, but mandatory. Since the majority of central heat plants on U.S. military installations are nearing the end of their useful life, there is an opportunity to replace outdated existing equipment with modem technologies.

  12. New energy-conserving passive solar single-family homes. Cycle 5, Category 2 HUD solar heating and cooling demonstration program

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The 91 new single-family, energy-conserving passive solar homes described represent award winning designs of the series of five demonstration cycles of the HUD program. Information is presented to help builders and lenders to understand passive solar design, to recognize passive solar buildings, and to provide specific design, construction, and marketing suggestions and details. The first section describes the concept of passive solar energy, explains the various functions which passive solar systems must perform, and discusses the various types of passive systems found in the Cycle 5 projects. The second section discusses each of the 91 solar homes. The third section details the issues of climate requirements and site design concerns, gives examples of building construction, and suggests how to market solar homes. The appendices address more technical aspects of the design and evaluation of passive solar homes.

  13. Daemen Alternative Energy/Geothermal Technologies Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Daemen Alternative EnergyGeothermal Technologies Demonstration Program Erie County Daemen Alternative EnergyGeothermal Technologies Demonstration Program Erie County Project ...

  14. National Hydrogen Learning Demonstration Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learning Demonstration Status National Hydrogen Learning Demonstration Status Download presentation slides from the Fuel Cell Technologies Program webinar "National Hydrogen ...

  15. Manufacturing Demonstration Facility Workshop Videos | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing Demonstration Facility Workshop Videos Manufacturing Demonstration Facility Workshop Videos Dr. Leo Christodoulou, Program Manager, EERE Advanced Manufacturing ...

  16. The role of reservoir characterization in the reservoir management process (as reflected in the Department of Energy`s reservoir management demonstration program)

    SciTech Connect (OSTI)

    Fowler, M.L.; Young, M.A.; Madden, M.P.

    1997-08-01

    Optimum reservoir recovery and profitability result from guidance of reservoir practices provided by an effective reservoir management plan. Success in developing the best, most appropriate reservoir management plan requires knowledge and consideration of (1) the reservoir system including rocks, and rock-fluid interactions (i.e., a characterization of the reservoir) as well as wellbores and associated equipment and surface facilities; (2) the technologies available to describe, analyze, and exploit the reservoir; and (3) the business environment under which the plan will be developed and implemented. Reservoir characterization is the essential to gain needed knowledge of the reservoir for reservoir management plan building. Reservoir characterization efforts can be appropriately scaled by considering the reservoir management context under which the plan is being built. Reservoir management plans de-optimize with time as technology and the business environment change or as new reservoir information indicates the reservoir characterization models on which the current plan is based are inadequate. BDM-Oklahoma and the Department of Energy have implemented a program of reservoir management demonstrations to encourage operators with limited resources and experience to learn, implement, and disperse sound reservoir management techniques through cooperative research and development projects whose objectives are to develop reservoir management plans. In each of the three projects currently underway, careful attention to reservoir management context assures a reservoir characterization approach that is sufficient, but not in excess of what is necessary, to devise and implement an effective reservoir management plan.

  17. SPACE-R Thermionic Space Nuclear Power System: Design and Technology Demonstration Program. Semiannual technical progress report for period ending March 1993

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This Semiannual Technical Progress Report summarizes the technical progress and accomplishments for the Thermionic Space Nuclear Power System (TI-SNPS) Design and Technology Demonstration Program of the Prime Contractor, Space Power Incorporated (SPI), its subcontractors and supporting National Laboratories during the first half of the Government Fiscal Year (GFY) 1993. SPI`s subcontractors and supporting National Laboratories include: Babcock & Wilcox for the reactor core and externals; Space Systems/Loral for the spacecraft integration; Thermocore for the radiator heat pipes and the heat exchanger; INERTEK of CIS for the TFE, core elements and nuclear tests; Argonne National Laboratories for nuclear safety, physics and control verification; and Oak Ridge National laboratories for materials testing. Parametric trade studies are near completion. However, technical input from INERTEK has yet to be provided to determine some of the baseline design configurations. The INERTEK subcontract is expected to be initiated soon. The Point Design task has been initiated. The thermionic fuel element (TFE) is undergoing several design iterations. The reactor core vessel analysis and design has also been started.

  18. GASIS demonstration

    SciTech Connect (OSTI)

    Vidas, E.H.

    1995-04-01

    A prototype of the GASIS database and retrieval software has been developed and is the subject of this poster session and computer demonstration. The prototype consists of test or preliminary versions of the GASIS Reservoir Data System and Source Directory datasets and the software for query and retrieval. The prototype reservoir database covers the Rocky Mountain region and contains the full GASIS data matrix (all GASIS data elements) that will eventually be included on the CD-ROM. It is populated for development purposes primarily by the information included in the Rocky Mountain Gas Atlas. The software has been developed specifically for GASIS using Foxpro for Windows. The application is an executable file that does not require Foxpro to run. The reservoir database software includes query and retrieval, screen display, report generation, and data export functions. Basic queries by state, basin, or field name will be assisted by scrolling selection lists. A detailed query screen will allow record selection on the basis of any data field, such as depth, cumulative production, or geological age. Logical operators can be applied to any-numeric data element or combination of elements. Screen display includes a {open_quotes}browse{close_quotes} display with one record per row and a detailed single record display. Datasets can be exported in standard formats for manipulation with other software packages. The Source Directory software will allow record retrieval by database type or subject area.

  19. Demonstration & Market Transformation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration & Market Transformation Peer Review Break-Out Presentation Jim Spaeth Program Manager Demonstration & Market Transformation March 23, 2015 2 | Bioenergy Technologies Office DMT Portfolio Peer Review * Introduction of the DMT Peer Review Team * Peer Review Process - Ground rules for review process * DMT Approach to Project Management - Budget Periods * Changes Made in Response to the 2013 Peer Review - Lessons Learned / Best Practices * Portfolio Overview - FOA Status and

  20. Demonstration of LED Street Lighting

    SciTech Connect (OSTI)

    Kinzey, B. R.; Royer, M. P.; Hadjian, M.; Kauffman, R.

    2013-06-01

    GATEWAY program and Municipal Solid-State Street Lighting Consortium report on a demonstration of LED street lighting in Kansas City, MO.

  1. Letter Report - Verification Results for the Non-Real Property Radiological Release Program at the West Valley Demonstration Project, Ashford, New York

    SciTech Connect (OSTI)

    M.A. Buchholz

    2009-04-29

    The objective of the verification activities is to provide an independent review of the design, implementation, and performance of the radiological unrestricted release program for personal property, materials, and equipment (non-real property).

  2. Fuel Cell Hybrid Bus Lands at Hickam AFB: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Project (Fact Sheet)

    Broader source: Energy.gov [DOE]

    Fact sheet describes the initiation of NREL’s evaluation of a fuel cell hybrid electric bus at Hickam Air Force Base in Honolulu, Hawaii as part of DOE’s Hydrogen, Fuel Cells & Infrastructure Technologies Program.

  3. Categorical Exclusion Determinations: Loan Guarantee Program Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Loan Guarantee Program Office Categorical Exclusion Determinations: Loan Guarantee Program Office Categorical Exclusion Determinations issued by Loan Guarantee Program Office. DOCUMENTS AVAILABLE FOR DOWNLOAD February 22, 2013 CX-011970: Categorical Exclusion Determination Tuscarora Phase II Geothermal Observation Wells CX(s) Applied: B3.7 Date: 02/22/2013 Location(s): Nevada Offices(s): Loan Guarantee Program Office May 29, 2012 CX-012201: Categorical Exclusion

  4. Categorical Exclusion Determinations: Naval Nuclear Propulsion Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Naval Nuclear Propulsion Program Categorical Exclusion Determinations: Naval Nuclear Propulsion Program Categorical Exclusion Determinations issued by Naval Nuclear Propulsion Program. DOCUMENTS AVAILABLE FOR DOWNLOAD September 25, 2015 CX-014279: Categorical Exclusion Determination Lower Level Guard Post Replacement Project CX(s) Applied: B1.11, B1.15, B2.2 Date: 09/25/2015 Location(s): New York Offices(s): Naval Nuclear Propulsion Program July 6, 2015 CX-013878:

  5. LIMB Demonstration Project Extension and Coolside Demonstration

    SciTech Connect (OSTI)

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  6. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 3.7 Hydrogen Safety, Codes and Standards

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SAFETY, CODES AND STANDARDS SECTION Multi-Year Research, Development, and Demonstration Plan Page 3.7 - 1 3.7 Hydrogen Safety, Codes and Standards The United States and many other countries have established laws and regulations that require commercial products and infrastructure to meet all applicable codes and standards to demonstrate that they are safe, perform as designed and are compatible with the systems in which they are used. Hydrogen and fuel cell technologies have a history of safe use

  7. Product Demonstrations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Product Demonstrations Product Demonstrations The Consortium will pursue a number of demonstrations following the general procedure used by DOE's GATEWAY demonstration program. Specific products to be featured in a demonstration may be selected by the host site or may be suggested for a given installation by the Consortium based on the product's anticipated performance in that installation. In the latter case, products will be evaluated for suitability based on performance relative to other

  8. Enterprise Assessments Review, West Valley Demonstration Project...

    Broader source: Energy.gov (indexed) [DOE]

    management program at the West Valley Demonstration Project (WVDP) was conducted prior to ... Assessments Review, West Valley Demonstration Project - December 2014 (245.41 KB) ...

  9. Planning For Energy Development: Renewable Energy Demonstration...

    Energy Savers [EERE]

    First Steps Program Renewable Energy Demonstration Center Concept Mecca, CA Awardee: ... at the CRRP. * A Renewable Energy Demonstration Center (REDC) concept - presented as a ...

  10. Rock-mechanics instrumentation program for Kaiser Steel Corporation's demonstration of shield-type longwall supports at York Canyon Mine, Raton, New Mexico. Volume 1. Final report

    SciTech Connect (OSTI)

    Gentry, D.W.; Stewart, C.L.; King, R.P.

    1981-05-01

    This report presents the results of a rock mechanics instrumentation program designed to determine the rock mass response due to longwall mining a thick coal seam utilizing shield-type supports at the York Canyon Mine near Raton, New Mexico. The data collected during this study is unique in that it represents the results from mining three adjacent longwall panels varying from sub-critical to super-critical in a known geologic environment with cross- and along-panel topographic variations. Data from the program indicated the following: (1) Topography significantly influenced the magnitude and distribution of surface movements. (2) The study failed to substantiate the theory that the angle of draw decreased as the depth of overburden increased. (3) Subsidence started when the face was an average of 0.33h (h = overburden depth) from a given surface point and was essentially completed when the face was 0.9h beyond the surface point. (4) Underground mining activity produced almost instantaneous surface movement and major surface subsidence ceased almost as soon as mining ceased. (5) Topography influenced shield loading patterns only where the overburden depth was thin. (6) The width of the pressure abutment was apparently related to the depth of overburden. (7) The type of roof rock controlled the amount of roof-sag. (8) With longwall face advance, the roof tended to move away from surface topographic highs and towards the caved area. (9) Roof-floor convergence at the mining face was approximately one percent of extracted seam height. (10) The magnitude of roof-floor convergence out ahead of the mining face could be related to the face distance with a logarithmic curve function.

  11. SSL Demonstration: NE Cully Boulevard, Portland, OR

    SciTech Connect (OSTI)

    2012-11-01

    GATEWAY program report brief summarizing an SSL street lighting demonstration in a residential area of Portland, OR

  12. SSL Demonstration: Street Lighting, Kansas City, MO

    SciTech Connect (OSTI)

    2013-08-01

    GATEWAY program report brief summarizing an SSL street lighting demonstration at nine separate installations in Kansas City, MO.

  13. SSL Demonstration: Central Park, New York City

    SciTech Connect (OSTI)

    2012-11-01

    GATEWAY program report brief summarizing an SSL pathway lighting demonstration in Central Park in New York City.

  14. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  15. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming Compiling and linking programs on Euclid. Compiling Codes How to compile and link MPI codes on Euclid. Read More » Using the ACML Math Library How to compile and link a code with the ACML library and include the $ACML environment variable. Read More » Process Limits The hard and soft process limits are listed. Read More » Last edited: 2016-04-29 11:35:11

  16. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming The genepool system has a diverse set of software development tools and a rich environment for delivering their functionality to users. Genepool has adopted a modular system which has been adapted from the Programming Environments similar to those provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu/4.6". The "gnu" indicates that it is providing the GNU environment, principally GCC,

  17. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Read More Programming Tuning Options Tips for tuning performance on the Hopper system ... The ACML library is also supported on Hopper and Franklin. Read More PGAS Language ...

  18. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage & File Systems Application Performance Data & Analytics Job Logs & Statistics ... Each programming environment contains the full set of compatible compilers and libraries. ...

  19. Enterprise Assessments Review of the West Valley Demonstration...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Site Fire Protection Program - March 2016 Enterprise Assessments Review of the West Valley Demonstration Project Site Fire Protection Program - ...

  20. The Department of Energy's $700 Million Smart Grid Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    700 Million Smart Grid Demonstration Program Funded through the American Recovery and ... of Energy's 700 Million Smart Grid Demonstration Program Funded through the American ...

  1. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using MPI and OpenMP on NERSC systems, the same does not always exist for other supported parallel programming models such as UPC or Chapel. At the same time, we know that these...

  2. Better Buildings Residential Program Solution Center Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    So if you haven't already, and if you're using a phone to join us, please enter your ... Center, there is a search box, and it will accept any search terms that you want to use. ...

  3. Downlight Demonstration Program: Hilton Columbus Downtown

    SciTech Connect (OSTI)

    Davis, Robert G.; Perrin, Tess E.

    2014-05-13

    The U.S. Department of Energy (DOE) estimates that there were about 700 million downlight luminaires installed in residential and commercial buildings in the U.S. as of 2012, with light-emitting diode (LED) luminaires representing less than 1% of this installed base. Downlight luminaires using conventional incandescent, halogen, and compact fluorescent lamps have lower efficacies and shorter expected lifetimes than comparable LED systems, but the lower initial cost of the conventional technology and the uncertainties associated with the newer LED technology have restricted widespread adoption of LED downlight luminaires. About 278 tBtu of energy could be saved annually if LED luminaires were to saturate the downlight market, equating to an annual energy cost savings of $2.6 billion. This report summarizes an evaluation of LED recessed downlight luminaires in the guest rooms at the Hilton Columbus Downtown hotel in Columbus, OH. The facility opened in October of 2012, and the U.S. Department of Energy (DOE) conducted a post-occupancy assessment of the facility in January–March of 2014. Each of the 484 guest rooms uses seven 15 W LED downlights: four downlights in the entry and bedroom and three downlights in the bathroom. The 48 suites use the seven 15 W LED downlights and additional fixtures depending on the space requirements, so that in total the facility has more than 3,700 LED downlights. The downlights are controlled through wall-mounted switches and dimmers. A ceiling-mounted vacancy sensor ensures that the bathroom luminaires are turned off when the room is not occupied.

  4. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Transportation - September 2000 | Department of Energy West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) This report provides the results of an independent review of the

  5. Manufacturing Demonstration Facility

    Energy Savers [EERE]

    of Energy Manufacturing Demonstration Facility DOE Advanced Manufacturing Office Merit Review Craig Blue Director, Manufacturing Demonstration Facility Energy and ...

  6. Demonstration Assessment of LED Parking Structure Lighting

    SciTech Connect (OSTI)

    Kinzey, B. R.; Myer, M. A.

    2013-03-01

    GATEWAY program report on a demonstration of LED parking structure lighting at the U.S. Dept. of Labor headquarters in Washington, DC.

  7. Trial Demonstration of Area Lighting Retrofit

    Energy Savers [EERE]

    Trial Demonstration of Area Lighting Retrofit Host Site: Yuma Border Patrol, Yuma, Arizona December 2014 Prepared for: Solid-State Lighting Program Building Technologies Office ...

  8. SSL Demonstration: Parking Garage Lighting, Washington, DC

    SciTech Connect (OSTI)

    2013-06-01

    GATEWAY program report brief summarizing an SSL parking garage demonstration at the Dept. of Labor headquarters parking garage in Washington, DC.

  9. GATEWAY Demonstration Indoor Projects | Department of Energy

    Energy Savers [EERE]

    LED Wall Washer Retrofit: College Park, Maryland At the University of Maryland, the GATEWAY program looked at LED wall washer options for a demonstration at the Clarice Smith ...

  10. Tidd PFBC demonstration project

    SciTech Connect (OSTI)

    Marrocco, M.

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  11. Technology Demonstration Partnership Policy

    Broader source: Energy.gov [DOE]

    This City Council memorandum establishes a framework for engaging in and evaluating demonstration partnerships with the goal of developing, testing, and demonstrating emerging technologies, product, and service innovations.

  12. Radiation Emergency Procedure Demonstrations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dressing To Prevent the Spread of Radioactive Contamination This demonstration shows how ... Preparing The Area This demonstration shows basic steps you can take to gather equipment ...

  13. Newberry EGS Demonstration

    Broader source: Energy.gov (indexed) [DOE]

    Newberry EGS Demonstration Susan Petty, PI AltaRock Energy EGS Demonstration Projects Project Officer: Lauren Boyd Total Project Funding: 43.8 m April 22, 2013 This presentation ...

  14. Buried Waste Integrated Demonstration Plan

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  15. Strategy Guideline. Demonstration Home

    SciTech Connect (OSTI)

    Hunt, A.; Savage, C.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  16. Strategy Guideline: Demonstration Home

    SciTech Connect (OSTI)

    Savage, C.; Hunt, A.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  17. Data surety demonstrations

    SciTech Connect (OSTI)

    Draelos, T.; Harris, M.; Herrington, P.; Kromer, D.

    1998-08-01

    The use of data surety within the International Monitoring System (IMS) is designed to offer increased trust of acquired sensor data at a low cost. The demonstrations discussed in the paper illustrate the feasibility of hardware authentication for sensor data and commands in a retrofit environment and a new system and of the supporting key management system. The individual demonstrations which are summarized in the paper are: (1) demonstration of hardware authentication for communication authentication in a retrofit environment; (2)demonstration of hardware authentication in a new system; and (3) demonstration of key management for sensor data and command authentication.

  18. Energy Department Announces Offshore Wind Demonstration Awardees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Announces Offshore Wind Demonstration Awardees Energy Department Announces Offshore Wind Demonstration Awardees January 10, 2013 - 1:08pm Addthis This is an excerpt from the Fourth Quarter 2012 edition of the Wind Program R&D Newsletter. The U.S. Department of Energy (DOE) Wind Program recently announced seven technology demonstration partnerships with broad consortia that are developing breakthrough offshore wind energy generation projects. The primary goals of

  19. Commercial office daylighting demonstration

    SciTech Connect (OSTI)

    Pike, T.F.; Rizzuto, J.

    1981-01-01

    The results of a commerical office photoelectrically controlled, dimmable lighting demonstration in New York City have shown that daylighting can be used to conserve energy and limit peak electrical demand. In this demonstration, three photo-electrically controlled dimming systems were compared side-by-side to test the concept of independent dimming of banks of luminaires controlled with individual photocells.

  20. Demonstration of an Enhanced Geothermal System at the Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration of an Enhanced Geothermal System at the Northwest Geysers Geothermal Field, California Geothermal Technologies Program 2010 Peer Review Demonstration of an Enhanced ...

  1. U.S. Offshore Wind Advanced Technology Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OFFSHORE WIND: ADVANCED TECHNOLOGY DEMONSTRATION PROJECTS + + + + + PUBLIC MEETING + + ... we are here 19 today to discuss our demonstration program, 20 which is the last and very ...

  2. Development and Demonstration of a Fuel-Efficient HD Engine ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engine (DOE SuperTruck Program) Development and Demonstration of a Fuel-Efficient HD ... More Documents & Publications Development and Demonstration of a Fuel-Efficient HD Engine

  3. Core Drilling Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE)

    Tank Farms workers demonstrate core drilling capabilities for Hanford single-shell tanks. Core drilling is used to determine the current condition of each tank to assist in the overall assessment...

  4. Response Resources Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interoperability of Demand Response Resources Demonstration in NY Final Technical Report Award Number: DE-FC26-08NT02869 Project Type: Regional Demonstration Principal Investigator: Andre Wellington, Project Manager, Smart Grid Implementation Group Recipient: Consolidated Edison Company of New York, Inc. Team members: Innoventive Power and Verizon Communications Consolidated Edison Company of New York, Inc. Taxpayer ID Number: 13-5009340 Organizational DUNS: 00-698-2359 4 Irving Place New York,

  5. Enterprise Assessments Review of the West Valley Demonstration Project Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fire Protection Program - March 2016 | Department of Energy West Valley Demonstration Project Site Fire Protection Program - March 2016 Enterprise Assessments Review of the West Valley Demonstration Project Site Fire Protection Program - March 2016 March 2016 Review of the Fire Protection Program at the West Valley Demonstration Project The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted a review of the fire protection program at the West Valley

  6. Demonstration Assessment of Light-Emitting Diode (LED) Accent...

    Office of Scientific and Technical Information (OSTI)

    Subject: 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; AIR CONDITIONING; CONTROL SYSTEMS; DEMONSTRATION PROGRAMS; DESIGN; EDUCATIONAL FACILITIES; FEEDBACK; HALOGENS; ...

  7. Frequently Asked Questions About the Technology Demonstration GATEWAY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program | Department of Energy Frequently Asked Questions About the Technology Demonstration GATEWAY Program Frequently Asked Questions About the Technology Demonstration GATEWAY Program This page addresses many of the questions about the DOE Solid-State Lighting Technology Demonstration GATEWAY program raised by potential eligible participants, such as manufacturers, demonstration host sites, utilities, and energy efficiency organizations. What is the DOE Solid-State Lighting (SSL)

  8. Demonstration of Light-Emitting Diode (LED) Retrofit Lamps

    SciTech Connect (OSTI)

    Miller, N.

    2011-09-01

    GATEWAY program report on a demonstration of LED retrofit lamps at the Jordan Schnitzer Museum of art in Eugene, OR

  9. Lessons Learned from Microgrid Demonstrations Worldwide

    SciTech Connect (OSTI)

    Marnay, Chris; Zhou, Nan; Qu, Min; Romankiewicz, John

    2012-01-31

    The survey leads to policy recommendations for starting a microgrid demonstration program and overall development of microgrid and distributed energy. Additionally, specific recommendations have been made for China specifically.

  10. Hydrogen Vehicle and Infrastructure Demonstration and Validation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Vehicle and Infrastructure Demonstration and Validation Hydrogen Vehicle and Infrastructure Demonstration and Validation 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. tv_05_sell.pdf (8.4 MB) More Documents & Publications HYDROGEN TO THE HIGHWAYS Vehicle Technologies Office Merit Review 2014: Accelerating Alternatives for Minnesota Drivers Lean Gasoline System Development

  11. Innovative Demonstration Platform: PEC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JOINT CENTER FOR ARTIFICIAL PHOTOSYNTHESIS SOLAR PEC H 2 DEVICES FRANCES HOULE AWSM workshop April 14-15, 2016 LAWRENCE BERKELEY NATIONAL LABORATORY THE STATE OF THE ART Fraunhofer/JCAP JCAP JCAP JCAP JCAP 2016 >15% JCAP Updated with 2015-16 demonstrations DEVICE TYPES FOR DEMONSTRATIONS 10% PLANAR DEVICE: THE LOUVERED DESIGN WITH FULL PRODUCT SEPARATION Potential (mV) Cell parameters: PV width = 1.43 cm Nafion height = 3.10 mm Channel height = 3.25 mm Catalysts: IrO 2 and Pt Solution: 1 M H

  12. Gigashot Optical Laser Demonstrator

    SciTech Connect (OSTI)

    Deri, R. J.

    2015-10-13

    The Gigashot Optical Laser Demonstrator (GOLD) project has demonstrated a novel optical amplifier for high energy pulsed lasers operating at high repetition rates. The amplifier stores enough pump energy to support >10 J of laser output, and employs conduction cooling for thermal management to avoid the need for expensive and bulky high-pressure helium subsystems. A prototype amplifier was fabricated, pumped with diode light at 885 nm, and characterized. Experimental results show that the amplifier provides sufficient small-signal gain and sufficiently low wavefront and birefringence impairments to prove useful in laser systems, at repetition rates up to 60 Hz.

  13. Demonstrating carbon capture

    SciTech Connect (OSTI)

    Qader, A.; Hooper, B.; Stevens, G.

    2009-11-15

    Australia is at the forefront of advancing CCS technology. The CO2CRC's H3 (Post-combustion) and Mulgrave (pre-combustion) capture projects are outlined. The capture technologies for these 2 demonstration projects are described. 1 map., 2 photos.

  14. Enterprise Assessments Review, West Valley Demonstration Project -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2014 | Department of Energy Emergency Management Program Technical Basis and Emergency Preparedness The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's independent oversight program from the Department's former Office of Health, Safety and Security (HSS). This independent review of the emergency management program at the West Valley Demonstration Project (WVDP) was

  15. LIMB Demonstration Project Extension and Coolside Demonstration. [Final report

    SciTech Connect (OSTI)

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  16. AVNG system demonstration

    SciTech Connect (OSTI)

    Thron, Jonathan Louis; Mac Arthur, Duncan W; Kondratov, Sergey; Livke, Alexander; Razinkov, Sergey

    2010-01-01

    An attribute measurement system (AMS) measures a number of unclassified attributes of potentially classified material. By only displaying these unclassified results as red or green lights, the AMS protects potentially classified information while still generating confidence in the measurement result. The AVNG implementation that we describe is an AMS built by RFNC - VNIIEF in Sarov, Russia. To provide additional confidence, the AVNG was designed with two modes of operation. In the secure mode, potentially classified measurements can be made with only the simple red light/green light display. In the open mode, known unclassified material can be measured with complete display of the information collected from the radiation detectors. The AVNG demonstration, which occurred in Sarov, Russia in June 2009 for a joint US/Russian audience, included exercising both modes of AVNG operation using a number of multi-kg plutonium sources. In addition to describing the demonstration, we will show photographs and/or video taken of AVNG operation.

  17. Nucla CFB Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  18. National Hydrogen Learning Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Keith Wipke, Sam Sprik, Jennifer Kurtz, Todd Ramsden, Chris Ainscough, Genevieve Saur February 6, 2012 DOE's Informational Webinar Series National Hydrogen Learning Demonstration Status This presentation does not contain any proprietary, confidential, or otherwise restricted information NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable Energy, LLC v8 National Renewable Energy Laboratory 2

  19. The Edgewater Coolside process demonstration

    SciTech Connect (OSTI)

    McCoy, D.C.; Scandrol, R.O.; Statnick, R.M.; Stouffer, M.R.; Winschel, R.A.; Withum, J.A.; Wu, M.M.; Yoon, H. )

    1992-02-01

    The Edgewater Coolside process demonstration met the program objectives which were to determine Coolside SO[sub 2] removal performance, establish short-term process operability, and evaluate the economics of the process versus a limestone wet scrubber. On a flue gas produced from the combustion of 3% sulfur coal, the Coolside process achieved 70% SO[sub 2] removal using commercially-available hydrated lime as the sorbent. The operating conditions were Ca/S mol ratio 2.0, Na/Ca mol ratio 0.2, and 20[degree]F approach to adiabatic saturation temperature ([del]T). During tests using fresh plus recycle sorbent, the recycle sorbent exhibited significant capacity for additional SO[sub 2] removal. The longest steady state operation was eleven days at nominally Ca/S = 2, Na/Ca = 0.22, [del]T = 20--22[degree]F, and 70% SO[sub 2] removal. The operability results achieved during the demonstration indicate that with the recommended process modifications, which are discussed in the Coolside process economic analysis, the process could be designed as a reliable system for utility application. Based on the demonstration program, the Coolside process capital cost for a hypothetical commercial installation was minimized. The optimization consisted of a single, large humidifier, no spare air compressor, no isolation dampers, and a 15 day on-site hydrated lime storage. The levelized costs of the Coolside and the wet limestone scrubbing processes were compared. The Coolside process is generally economically competitive with wet scrubbing for coals containing up to 2.5% sulfur and plants under 350 MWe. Site-specific factors such as plant capacity factor, SO[sub 2] emission limit, remaining plant life, retrofit difficulty, and delivered sorbent cost affect the scrubber-Coolside process economic comparison.

  20. The Edgewater Coolside process demonstration

    SciTech Connect (OSTI)

    McCoy, D.C.; Scandrol, R.O.; Statnick, R.M.; Stouffer, M.R.; Winschel, R.A.; Withum, J.A.; Wu, M.M.; Yoon, H.

    1992-02-01

    The Edgewater Coolside process demonstration met the program objectives which were to determine Coolside SO{sub 2} removal performance, establish short-term process operability, and evaluate the economics of the process versus a limestone wet scrubber. On a flue gas produced from the combustion of 3% sulfur coal, the Coolside process achieved 70% SO{sub 2} removal using commercially-available hydrated lime as the sorbent. The operating conditions were Ca/S mol ratio 2.0, Na/Ca mol ratio 0.2, and 20{degree}F approach to adiabatic saturation temperature ({del}T). During tests using fresh plus recycle sorbent, the recycle sorbent exhibited significant capacity for additional SO{sub 2} removal. The longest steady state operation was eleven days at nominally Ca/S = 2, Na/Ca = 0.22, {del}T = 20--22{degree}F, and 70% SO{sub 2} removal. The operability results achieved during the demonstration indicate that with the recommended process modifications, which are discussed in the Coolside process economic analysis, the process could be designed as a reliable system for utility application. Based on the demonstration program, the Coolside process capital cost for a hypothetical commercial installation was minimized. The optimization consisted of a single, large humidifier, no spare air compressor, no isolation dampers, and a 15 day on-site hydrated lime storage. The levelized costs of the Coolside and the wet limestone scrubbing processes were compared. The Coolside process is generally economically competitive with wet scrubbing for coals containing up to 2.5% sulfur and plants under 350 MWe. Site-specific factors such as plant capacity factor, SO{sub 2} emission limit, remaining plant life, retrofit difficulty, and delivered sorbent cost affect the scrubber-Coolside process economic comparison.

  1. Marketing Plan for Demonstration and Validation Assets

    SciTech Connect (OSTI)

    2008-05-30

    The National Security Preparedness Project (NSPP), is to be sustained by various programs, including technology demonstration and evaluation (DEMVAL). This project assists companies in developing technologies under the National Security Technology Incubator program (NSTI) through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. This report documents the DEMVAL marketing and visibility plan, which will focus on collecting information about, and expanding the visibility of, DEMVAL assets serving businesses with national security technology applications in southern New Mexico.

  2. CCUS Demonstrations Making Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9, First Quarter, 2013 www.fossil.energy.gov/news/energytoday.html HigHligHts inside 2 CCUS Demonstrations Making Progress A Column from the Director of Clean Energy Sys- tems, Office of Clean Coal 4 LNG Exports DOE Releases Third Party Study on Impact of Natural Gas Exports 5 Providing Emergency Relief Petroleum Reservers Helps Out with Hurricane Relief Efforts 7 Game-Changing Membranes FE-Funded Project Develops Novel Membranes for CCUS 8 Shale Gas Projects Selected 15 Projects Will Research

  3. Switchgrass Demonstration Project

    SciTech Connect (OSTI)

    De La Torre Ugarte, Daniel; English, Burton C.

    2012-04-05

    Develop a pilot study that establishes up to 120 acres of cropland in switchgrass and 20 acres on a TN Experiment Station Farm. This subtask would assess production of switchgrass within the state of Tennessee under a variety of conditions and topography through on-farm production totaling 120 acres. Farms would be selected to participate through a bid process. Costs of establishment and maintenance of the switchgrass would be covered. In addition, allowances would be made for covering land rent and providing a yield incentive. An information and education program would be provided to producers prior to the bid process to assist producers in their bid decision. Agronomic, logistic, energy conversion and farming system issues associated with commercialization of a biomass energy industry are evaluated. Information on the opportunities for producing switchgrass as an energy feedstock are extended

  4. Residential Transactive Control Demonstration

    SciTech Connect (OSTI)

    Widergren, Steven E.; Fuller, Jason C.; Marinovici, Maria C.; Somani, Abhishek

    2014-02-19

    Arguably the most exciting aspect of the smart grid vision is the full participation of end-use resources with all forms of generation and energy storage in the reliable and efficient operation of an electric power system. Engaging all of these resources in a collaborative manner that respects the objectives of each resource, is sensitive to the system and local constraints of electricity flow, and scales to the large number of devices and systems participating is a grand challenge. Distributed decision-making system approaches have been presented and experimentation is underway. This paper reports on the preliminary findings of a residential demand response demonstration that uses the bidding transactions of supply and end-use air conditioning resources communicating with a real-time, 5 minute market to balance the various needs of the participants on a distribution feeder. The nature of the demonstration, the value streams being explored, and the operational scenarios implemented to characterize the system response are summarized along with preliminary findings.

  5. Smart Grid Demonstration Project

    SciTech Connect (OSTI)

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  6. Fusion Power Demonstration III

    SciTech Connect (OSTI)

    Lee, J.D.

    1985-07-01

    This is the third in the series of reports covering the Fusion Power Demonstration (FPD) design study. This volume considers the FPD-III configuration that incorporates an octopole end plug. As compared with the quadrupole end-plugged designs of FPD-I and FPD-II, this octopole configuration reduces the number of end cell magnets and shortens the minimum ignition length of the central cell. The end-cell plasma length is also reduced, which in turn reduces the size and cost of the end cell magnets and shielding. As a contiuation in the series of documents covering the FPD, this report does not stand alone as a design description of FPD-III. Design details of FPD-III subsystems that do not differ significantly from those of the FPD-II configuration are not duplicated in this report.

  7. Jennings Demonstration PLant

    SciTech Connect (OSTI)

    Russ Heissner

    2010-08-31

    Verenium operated a demonstration plant with a capacity to produce 1.4 million gallons of cellulosic ethanol from agricultural resiues for about two years. During this time, the plant was able to evaluate the technical issues in producing ethanol from three different cellulosic feedstocks, sugar cane bagasse, energy cane, and sorghum. The project was intended to develop a better understanding of the operating parameters that would inform a commercial sized operation. Issues related to feedstock variability, use of hydrolytic enzymes, and the viability of fermentative organisms were evaluated. Considerable success was achieved with pretreatment processes and use of enzymes but challenges were encountered with feedstock variability and fermentation systems. Limited amounts of cellulosic ethanol were produced.

  8. Security Technology Demonstration and Validation Sustainability Plan

    SciTech Connect (OSTI)

    2008-08-31

    This report describes the process of creating continuity and sustainability for demonstration and validation (DEMVAL) assets at the National Security Technology Incubator (NSTI). The DEMVAL asset program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The mission of the NSTI program is to identify, incubate, and accelerate technologies with national security applications at various stages of development by providing hands-on mentoring and business assistance to small businesses and emerging or growing companies. Part of this support is envisioned to be research and development of companies technology initiatives, at the same time providing robust test and evaluation of actual development activities. This program assists companies in developing technologies under the NSTI program through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. Development of the commercial potential for national security technologies is a significant NSTI focus. As part of the process of commercialization, a comprehensive DEMVAL program has been recognized as an essential part of the overall incubator mission. A number of resources have been integrated into the NSTI program to support such a DEMVAL program.

  9. Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting, Phase I

    SciTech Connect (OSTI)

    Myer, M. A.; Goettel, R. T.

    2010-06-22

    U.S. DOE Solid-State Lighting Technology Demonstration GATEWAY Program Report on the TJMaxx Demonstration.

  10. Coherent electron cooling demonstration experiment

    SciTech Connect (OSTI)

    Litvinenko, V.N.; Belomestnykh, S.; Ben-Zvi, I.; Brutus, J.C.; Fedotov, A.; Hao, Y.; Kayran, D.; Mahler, G.; Marusic, A.; Meng, W.; McIntyre, G.; Minty, M.; Ptitsyn, V.; Pinayev, I.; Rao, T.; Roser, T.; Sheehy, B.; Tepikian, S.; Than, R.; Trbojevic, D.; Tuozzolo, J.; Wang, G.; Yakimenko, V.; Hutton, A.; Krafft, G.; Poelker, M.; Rimmer, R.; Bruhwiler, D.; Abell, D.T.; Nieter, C.; Ranjbar, V.; Schwartz, B.; Kholopov M.; Shevchenko, O.; McIntosh, P.; Wheelhouse, A.

    2011-09-04

    Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron-hadron and electron-hadron colliders. In a CEC system, a hadron beam interacts with a cooling electron beam. A perturbation of the electron density caused by ions is amplified and fed back to the ions to reduce the energy spread and the emittance of the ion beam. To demonstrate the feasibility of CEC we propose a proof-of-principle experiment at RHIC using SRF linac. In this paper, we describe the setup for CeC installed into one of RHIC's interaction regions. We present results of analytical estimates and results of initial simulations of cooling a gold-ion beam at 40 GeV/u energy via CeC. We plan to complete the program in five years. During first two years we will build coherent electron cooler in IP2 of RHIC. In parallel we will develop complete package of computer simulation tools for the start-to-end simulation predicting exact performance of a CeC. The later activity will be the core of Tech X involvement into the project. We will use these tools to predict the performance of our CeC device. The experimental demonstration of the CeC will be undertaken in years three to five of the project. The goal of this experiment is to demonstrate the cooling of ion beam and to compare its measured performance with predictions made by us prior to the experiments.

  11. DEMONSTRATION BULK VITRIFICATION SYSTEM (DBVS) EXTERNAL REVIEW

    SciTech Connect (OSTI)

    HONEYMAN, J.O.

    2007-02-08

    The Hanford mission to retrieve and immobilize 53 million gallons of radioactive waste from 177 underground storage tanks will be accomplished using a combination of processing by the waste treatment plant currently under construction, and a supplemental treatment that would process low-activity waste. Under consideration for this treatment is bulk vitrification, a versatile joule-heated melter technology which could be deployed in the tank farms. The Department proposes to demonstrate this technology under a Research, Development and Demonstration (RD and D) permit issued by the Washington State Department of Ecology using both non-radioactive simulant and blends of actual tank waste. From the demonstration program, data would be obtained on cost and technical performance to enable a decision on the potential use of bulk vitrification as the supplemental treatment technology for Hanford. An independent review by sixteen subject matter experts was conducted to assure that the technical basis of the demonstration facility design would be adequate to meet the objectives of the Demonstration Bulk Vitrification System (DBVS) program. This review explored all aspects of the program, including flowsheet chemistry, project risk, vitrification, equipment design and nuclear safety, and was carried out at a time when issues can be identified and corrected. This paper describes the mission need, review approach, technical recommendations and follow-on activities for the DBVS program.

  12. Commercial Advanced Lighting Control Demonstration and Deployment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Advanced Lighting Control Demonstration and Deployment 2015 Building Technologies Office Peer Review Gabe Arnold, garnold@neep.org NEEP & DesignLights Consortium Project Summary Timeline: Start date: October 1, 2014 Planned end date: September 30, 2017 Key Milestones: 1. Recommended EE Program Offerings; October 30, 2015 2. Completed Curricula and Training Implementation Plan; December 30, 2015 3. All Demonstration Project Installations Complete; June 30, 2016 Budget: Total DOE $

  13. Commercial Advanced Lighting Control Demonstration and Deployment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Lighting Control Demonstration and Deployment 2016 Building Technologies Office Peer Review Gabe Arnold, garnold@neep.org, NEEP & DesignLights Consortium Jeff McCullough, jeff.mccullough@pnnl.gov, PNNL 2 Project Summary Timeline: Start date: October 1, 2014 Planned end date: September 30, 2017 Key Milestones 1. Recommended EE Program Offerings; date 2. Completed Curricula and Training Implementation Plan; date 3. All Demonstration Project Installations Complete; date Budget: Total

  14. SSL Demonstration: Wall Washers at the University of Maryland

    SciTech Connect (OSTI)

    2015-07-31

    GATEWAY program report brief summarizing a demonstration of LED wall washers at the Clarice Smith Performing Arts Center at the University of Maryland.

  15. Low-Temperature Combustion Demonstrator for High-Efficiency Clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for High-Efficiency Clean Combustion Low-Temperature Combustion Demonstrator for High-Efficiency Clean Combustion 2010 DOE Vehicle Technologies and Hydrogen Programs Annual...

  16. Demonstration of a 50% Thermal Efficient Diesel Engine - Including...

    Broader source: Energy.gov (indexed) [DOE]

    The Path to a 50% Thermal Efficient Engine Heavy Truck Clean Diesel (HTCD) Program: 2007 Demonstration Truck Integrated Virtual Lab in Supporting Heavy Duty Engine and Vehicle ...

  17. Demonstration of an Enhanced Geothermal System at the Northwest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California; 2010 Geothermal Technology Program Peer Review Report Demonstration of an Enhanced Geothermal System at the Northwest Geysers Geothermal Field, California; 2010 ...

  18. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect (OSTI)

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  19. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-10-01

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  20. Environmental management technology demonstration and commercialization

    SciTech Connect (OSTI)

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-12-31

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  1. Commercial Building Demonstration and Deployment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Building Demonstration and Deployment 2014 Building Technologies Office Peer ... April 23 rd 11:15-11:30 Commercial DemonstrationDeployment Overview Kristen Taddonio, ...

  2. Institutional barriers to solar energy: early HUD demonstration experiences

    SciTech Connect (OSTI)

    Mara, G.; Engel, D.

    1980-03-01

    After briefly describing the Residential Solar Demonstration Program of HUD, several of the program experiences are discussed. The HUD program found that, in practice, most institutions presented only minor problem for active solar heating and cooling of homes. Demonstration experiences suggest solutions to problems which may arise outside the program, particularly as solar applications other than heating and cooling becomemore widespread. The HUD program will continue to study institutional problems for the program's passive solar grants and will focus on areas like the cities, where institutional concerns are more complex.

  3. Operational results of National Solar Demonstration Projects

    SciTech Connect (OSTI)

    Waite, E.V.

    1981-01-01

    Included in the National Solar Demonstration Program are examples of earth-sheltered, passive solar designs. The data obtained from these sites presents an interesting look at what is both technically and economically feasible. Data from four demonstration sites that are members of the National Solar Data Network are utilized to present an economic and technical analyses of a group of four sites. Three of these sites are earth sheltered residential structures, the fourth is a commercial passive structure. This sample of four demonstration sites is not intended to provide a statistical representation of passive earth sheltered structures, but rather, an example of the type of information available through the National Solar Data Program and how this information may be utilized.

  4. Enhanced Geothermal Systems Demonstration Projects

    SciTech Connect (OSTI)

    Geothermal Technologies Office

    2013-08-06

    Several Enhanced Geothermal Systems (EGS) demonstration projects are highlighted on this Geothermal Technologies Office Web page.

  5. FIRST LEGO League Robotics Demonstration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FIRST LEGO League Robotics Demonstration FIRST LEGO League Robotics Demonstration WHEN: Mar 14, 2015 11:00 AM - 1:00 PM WHERE: Bradbury Science Museum 1350 Central Ave, Los Alamos, ...

  6. QuickPEP Tool Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    QuickPEP Tool Demonstration Riyaz Papar, PE, CEM Director, Energy Assets & Optimization ... * Plant Energy Profiling * QuickPEP Demonstration * New features in Quick 2.0 * Wrap Up ...

  7. GATEWAY Demonstrations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GATEWAY Demonstrations GATEWAY Demonstrations DOE GATEWAY demonstrations enable detailed LED product evaluation and hands-on experience that cannot be replicated in a lab. High-performance LED products are selected and installed in real-world applications, providing valuable data and experience on product performance and cost effectiveness. The results often reveal important issues related to installation, interface, and control. Results DOE shares the results of completed GATEWAY demonstration

  8. Hydrogen Storage Materials Database Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Storage Materials Database Demonstration FUEL CELL TECHNOLOGIES ... 12132011 Hydrogen Storage Materials Database Marni Lenahan December 13, 2011 Database ...

  9. Buried Waste Integrated Demonstration Plan. Revision 1

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  10. Learning Demonstration Interim Progress Report -- July 2010

    SciTech Connect (OSTI)

    Wipke, K.; Spirk, S.; Kurtz, J.; Ramsden, T.

    2010-09-01

    This report discusses key results based on data through December 2009 from the U.S. Department of Energy's (DOE) Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project, also referred to as the National Fuel Cell Electric Vehicle (FCEV) Learning Demonstration. The report serves to help transfer knowledge and lessons learned within various parts of DOE's hydrogen program, as well as externally to other stakeholders. It is the fourth such report in a series, with previous reports being published in July 2007, November 2007, and April 2008.