  1. Program Evaluation: Define Review Purpose and Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Define Review Purpose and Scope Program Evaluation: Define Review Purpose and Scope The first step in preparation for a particular peer review is to determine the specific purpose and scope of the review within the context of other review and management activities. Improving program management and demonstrating public accountability, providing an honest independent technical review of the projects and program, and communicating the value of the programs to the larger public are all potentially

  2. Software Defined Networking (SDN) Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software Defined Networking (SDN) Project Energy sector-focused SDN flow controller to manage control system networks centrally and securely Background Traditional information technology (IT) approaches to network administration and packet delivery are not always appropriate for electric industry applications. The nondeterministic latency and configuration complexity make network design difficult for the deterministic, static control systems of the energy sector. In the electric industry, it is

  3. IDC Reengineering Phase 2 Project Scope.

    SciTech Connect (OSTI)

    Harris, James M.

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta

  4. Software Defined Networking (SDN) Project

    Energy Savers [EERE]

    with the SEL-2740S substation hardened switch, developed through the Watchdog Project. ... is developing a flow controller to be used with the SEL- 2740S substation hardened switch. ...

  5. PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope and

    Office of Environmental Management (EM)

    Plan Project Scope and Objectives Examples Example 6 2.3 MISSION OBJECTIVES Stabilization of plutonium-bearing materials and deactivation/dismantlement of the PFP Complex will result in the virtual elimination of the hazards and risks associated with the facility and will greatly reduce the costs of safe, secure S&M. Using the lessons learned from deactivation projects across the DOE Complex, further improvement on previously applied deactivation methods is anticipated. The major mission

  6. Secure Software-Defined Radio Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software-Defined Radio Project Secure, versatile radio for "last mile" communications to utility distribution automation devices Background Communication to and from utility distribution automation devices provides greater system reliability and uptime, faster restoration, and more cost effective operations. However, many of these utility devices are located in remote locations, making secure communications difficult. Wired communication such as fiber optic cabling can be prohibitively

  7. PROJECT PROFILE: Defining the Defect Chemistry and Structural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties Required for ...

  8. PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Required for 24%-Efficient CdTe Devices | Department of Energy Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices Funding Opportunity: SuNLaMP SunShot Subprogram: Photovoltaics Location: National Renewable Energy Laboratory, Golden, CO Amount Awarded: $6,900,000 While crystalline silicon accounted for two thirds of the photovoltaic (PV)

  9. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    SciTech Connect (OSTI)

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  10. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-0501 Unlimited Release Printed February 2013 Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Joseph W. Pratt and Aaron P. Harris Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security

  11. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    SciTech Connect (OSTI)

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  12. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  13. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  14. Scoping Study for Demand Respose DFT II Project in Morgantown, WV

    SciTech Connect (OSTI)

    Lu, Shuai; Kintner-Meyer, Michael CW

    2008-06-06

    This scoping study describes the underlying data resources and an analysis tool for a demand response assessment specifically tailored toward the needs of the Modern Grid Initiatives Demonstration Field Test in Phase II in Morgantown, WV. To develop demand response strategies as part of more general distribution automation, automated islanding and feeder reconfiguration schemes, an assessment of the demand response resource potential is required. This report provides the data for the resource assessment for residential customers and describes a tool that allows the analyst to estimate demand response in kW for each hour of the day, by end-use, season, day type (weekday versus weekend) with specific saturation rates of residential appliances valid for the Morgantown, WV area.

  15. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  16. High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

    SciTech Connect (OSTI)

    Larry Demick

    2010-08-01

    The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

  17. Scoping and Framing Social Opposition to U.S. Wind Projects (Poster)

    SciTech Connect (OSTI)

    Lantz, E.; Flowers, L.

    2010-05-01

    Historical barriers to wind power include cost and reliability. However, rapid growth has increased the footprint of wind power in the United States, and some parts of the country have begun to observe conflicts between local communities and wind energy development. Thus, while questions of economic viability and the ability of grid operators to effectively manage wind energy have become less significant, community acceptance issues have emerged as a barrier to wind and associated transmission projects. Increasing community acceptance is likely to be a growing challenge as the wind industry seeks electricity sector penetration levels approaching 20%.

  18. EIS-0489: Notice of Additional Public Scoping Meetings | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meetings EIS-0489: Notice of Additional Public Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project ...

  19. LED Surgical Task Lighting Scoping Study: A Hospital Energy Alliance Project

    SciTech Connect (OSTI)

    Tuenge, Jason R.

    2011-01-17

    Tungsten-halogen (halogen) lamps have traditionally been used to light surgical tasks in hospitals, even though they are in many respects ill-suited to the application due to the large percentage of radiant energy outside the visible spectrum and issues with color rendering/quality. Light-emitting diode (LED) technology offers potential for adjustable color and improved color rendition/quality, while simultaneously reducing side-effects from non-visible radiant energy. It also has the potential for significant energy savings, although this is a fairly narrow application in the larger commercial building energy use sector. Based on analysis of available products and Hospital Energy Alliance member interest, it is recommended that a product specification and field measurement procedure be developed for implementation in demonstration projects.

  20. Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work

    SciTech Connect (OSTI)

    D. E. Shanklin

    2007-07-25

    This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

  1. Advanced system demonstration for utilization of biomass as an energy source. Volume I. Scope and design criteria and project summary

    SciTech Connect (OSTI)

    1980-10-01

    The information in this document is the result of an intensive engineering effort to demonstrate the feasibility of biomass-fueled boilers in cogeneration applications. This design package is based upon a specific site in the State of Maine. However, the design is generic in nature and could serve as a model for other biomass conversion facilities located anywhere biomass is abundant. The project's purpose and summary information are presented: the plant, its concept of operation; and other overall information are described. The capital cost estimate for the plant, and the basis upon which it was obtained are given; a schedule of key milestones and activities required to construct the plant and put it into operation is presented; and the general findings in areas that affect the viability of the project are discussed. The technical design, biomass study, environmental impact, commercialization, and economic factors are addressed. Each major plant area and the equipment and facilities that each includes are discussed in depth. Some overall plant requirements, including noise control, reliability, maintainability, and safety, are detailed. The results of each study relating to alternatives considered for optimizing plant operation parameters and specific system process schemes are briefly presented. All economic factors that affect the feasibility and viability of the biomass project are defined and evaluated.

  2. Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan

    SciTech Connect (OSTI)

    Parazin, R.J.

    1998-08-28

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

  3. EIS-0458: Scoping Meeting Transcript

    Broader source: Energy.gov [DOE]

    Transcript of the public scoping meeting on the draft EIS for the proposed loan guarantee for the First Solar Topaz Solar Farm Project in San Luis Obispo County, CA.

  4. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  5. Commercial production and distribution of fresh fruits and vegetables: A scoping study on the importance of produce pathways to dose. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Marsh, T.L.; Anderson, D.M.; Farris, W.T.; Ikenberry, T.A.; Napier, B.A.; Wilfert, G.L.

    1992-09-01

    This letter report summarizes a scoping study that examined the potential importance of fresh fruit and vegetable pathways to dose. A simple production index was constructed with data collected from the Washington State Department of Agriculture (WSDA), the United States Bureau of the Census, and the United States Department of Agriculture (USDA). Hanford Environmental Dose Reconstruction (HEDR) Project staff from Battelle, Pacific Northwest Laboratories, in cooperation with members of the Technical Steering Panel (TSP), selected lettuce and spinach as the produce pathways most likely to impact dose. County agricultural reports published in 1956 provided historical descriptions of the predominant distribution patterns of fresh lettuce and spinach from production regions to local population centers. Pathway rankings and screening dose estimates were calculated for specific populations living in selected locations within the HEDR study area.

  6. I. Definition and Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Smart Grid RFI Page 2 November 1, 2010 I. Definition and Scope I.1. We invite comment however on whether this [Title XIII] is the best way to define the smart grid. What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? If the definition is overly broad, what policy risks emerge as a result? * While Title XIII starts framing the necessary committee's and organizations needed to start outlining the Smart Grid discussion, it is lacking in the

  7. Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. ... expected to fund the project from GPP. SSO suggested that inclusion with HSM was required. ...

  8. EIS-0504: Notice of Extension of Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Scoping Period EIS-0504: Notice of Extension of Scoping Period Gulf LNG Liquefaction Project, Jackson County, Mississippi FERC extended the scoping period to September 15, 2014. For more information on this project, see the project page: http://energy.gov/node/948516. Download Document EIS-0504: Notice of Intent to Prepare Environmental Impact Statement (8.41 KB) More Documents & Publications EIS-0512: Notice of Public Scoping Meetings EIS-0512: Notice of Public Scoping Meetings

  9. EA-1903: Notice of Scoping of an Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Scoping of an Environmental Assessment Kansas State University (KSU) Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office is requesting public ...

  10. DOE Issues Request for Information for Scope Requirements Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information for Scope Requirements Planning at Los Alamos National Laboratory DOE Issues ... Completion Project Bridge Contract," reference number DE-SOL-0007781, for which a ...

  11. EIR SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR _...

    Office of Environmental Management (EM)

    SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR ... Date of Scoping Meeting: Date of Planned On-Site EIR: Name OrganizationPosition PhoneEmail ...

  12. U.S. Department of Energy Project Definition Rating Index Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-07-22

    This Guide assists individuals and teams involved in conducting assessments of project definition (i.e., how well front-end planning has been conducted to define project scope) using a numerical project management tool developed by the Construction Industry Institute (CII), tailored for DOE use. Called the Project Definition Rating Index (PDRI), the PDRI is a simple but powerful tool that facilitates the measurement of the degree of scope definition for completeness for traditional construction projects, both nuclear and non-nuclear. No cancellations.

  13. EIS-0407: Amended Notice of Intent to Modify the Scope of the...

    Broader source: Energy.gov (indexed) [DOE]

    Refinery Project near Hugoton, Kansas Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement for the Abengoa Refinery Project near Hugoton, Kanasas,...

  14. Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-08

    The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

  15. Scoping Period Closed

    Broader source: Energy.gov [DOE]

    The environmental impact statement (EIS) scoping period has ended. DOE is preparing a Draft EIS that will analyze and compare the potential environmental impacts of various alternative approaches...

  16. Scoping Materials | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Scoping Materials Scoping Meeting Notice Scoping Meeting Transcript Public Scoping Presentation Written Comment Form NEPA Fact Sheet Tritium Fact Sheet Tritium Production and Environmental Impacts TVA Fact Sheet

  17. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Energy Savers [EERE]

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  18. Scoping Period Open

    Broader source: Energy.gov [DOE]

    DOE has published in the Federal Register a Notice of Intent to prepare an environmental impact statement (EIS), and the scoping period is open for public comment for at least 30 days. DOE requests...

  19. Video Shoot Scope of Work

    Broader source: Energy.gov [DOE]

    Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  20. Richland Operations Office Cleanup Strategy, Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  1. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  2. Project Submission Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cooperation Project Title: CountryOrganizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: ...

  3. EIS-0463: Reopening of Scoping Period for the Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    ends on June 14, 2011. For more information see the project page at: http:energy.govnode300109. Download Document EIS-0463: Reopening of Scoping Period for the Environmental...

  4. Amended Notice of Intent To Modify the Scope of the EIS and Conduct...

    Energy Savers [EERE]

    the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173...

  5. 2014 Manufacturing Energy and Carbon Footprints: Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope The energy and carbon footprint analysis examines fifteen individual manufacturing sectors that together consume 95% of U.S. manufacturing primary energy consumption and account for 94% of U.S. manufacturing combustion greenhouse gas (GHG) emissions. Manufacturing sectors are defined by their respective NAICS (North American Industry Classification System) codes. i Individual sectors were selected for analysis based on their relative energy intensities, contribution to the U.S. economy,

  6. Secure Software-Defined Radio Project

    Broader source: Energy.gov (indexed) [DOE]

    event and access logging, encryption, disabling of unused ports, and intelligent password and network key management. * Many radios have data throughput below 1 megabit per ...

  7. Shifter: User Defined Images

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Shifter: User Defined Images Shifter: User Defined Images Shifter: Bringing Linux containers to HPC NERSC is working to increase flexibility and usability of its HPC systems by enabling Docker-like Linux container technology. Linux containers allow an application to be packaged with its entire software stack - including some portions of the base OS files - as well defining needed user environment variables and application "entry point.". Containers may provide an abstract way of

  8. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  9. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  10. Ventilation technologies scoping study

    SciTech Connect (OSTI)

    Walker, Iain S.; Sherman, Max H.

    2003-09-30

    This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the needs of California, determining residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and level of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  11. EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement Abengoa Refinery Project near Hugoton, Kansas Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement for the Abengoa Refinery Project near Hugoton, Kanasas, DOE/EIS-0407 (April 2009) 74 FR 19543 (2.34 MB) More Documents & Publications EIS-0407:

  12. Amended Notice of Intent To Modify the Scope of the EIS and Conduct

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 | Department of Energy Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 Amended Notice of Intent To Modify the

  13. March 2016 Project Dashboard | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments ... The current portfolio consists of 33 active projects with established scope, schedule, and cost performance baselines. ...

  14. EA-2004: Public Scoping Notice | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2004: Public Scoping Notice EA-2004: Public Scoping Notice The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct a 1.7-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental Assessment (EA) will

  15. EIS-0283-S2: Amended Notice of Intent to Modify the Scope of...

    Broader source: Energy.gov (indexed) [DOE]

    For more information on this project, see the project webpage: http:energy.govnode299815. Download Document EIS-0283-S2: Amended Notice of Intent to Modify the Scope of...

  16. Project Title: Rheocaster Project (4544) Program or Program Office...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Description: The work scope of this project consists of fumishing labor. supervision. materials. tools, equipment, and services as specified on drawings and in this...

  17. Hanford Advisory Board Budgets and Contracts Committee Meeting 2011 Hanford Lifecycle Scope, Schedule and Cost Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 Lifecycle Scope, Schedule and Cost Report Stephen Korenkiewicz, Project Manager US Department of Energy - Richland Operations Office June 6, 2013 1 2 Tri-Party Project Managers The U.S. Department of Energy (DOE), Richland Operations Office (RL) Project Integration and Control (PIC) organization is responsible for Tri-Party Agreement (TPA) Milestone M-036-01C, 2013 Hanford Lifecycle Scope, Schedule and Cost Report (Lifecycle Report) * Stephen Korenkiewicz is the RL Project Manager * David

  18. Scoping Comment Summary 092412.docx

    National Nuclear Security Administration (NNSA)

    Scoping Comment Summary for the Surplus Plutonium Disposition Supplemental Environmental Impact Statement U.S. Department of Energy, National Nuclear Security Administration, and Tennessee Valley Authority Since announcement of the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS), DOE has provided three opportunities for the public to provide scoping comments (2007 [72 FR 14543]; 2010 [75 FR 41850]; and 2012 [77 FR 1920]). The public scoping

  19. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  20. CMRR-NF Supplemental EIS Scoping Comments | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) CMRR-NF Supplemental EIS Scoping Comments CMRR-NF Supplemental EIS Scoping Comments Additional CMRR Scoping Comments - 47A Additional CMRR Scoping Comments - 48A Additional CMRR Scoping Comments - 62 Additional CMRR Scoping Comments - 63 Additional CMRR Scoping Comments - 64 Additional CMRR Scoping Comments - 66A Additional CMRR Scoping Comments - 66B Additional CMRR Scoping Comments - 66C Additional CMRR Scoping Comments - 76 Additional CMRR Scoping Comments - 77

  1. EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement | Department of Energy Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee The National Nuclear Security Administration (NNSA), an agency within the U.S. Department of Energy (DOE), is extending the scoping period for the

  2. REBUILD AMERICA PROGRAM SCOPE OF WORK

    SciTech Connect (OSTI)

    Jeffrey Brown; Bruce Exstrum

    2004-12-01

    This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

  3. Commercial Building Energy Alliance Exterior Lighting Scoping...

    Office of Scientific and Technical Information (OSTI)

    Commercial Building Energy Alliance Exterior Lighting Scoping Study Citation Details ... This report is a scoping study about challenges and energy saving potential regarding ...

  4. Building Energy Data Exchange Specification Scoping Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Exchange Specification Scoping Report Building Energy Data Exchange Specification Scoping Report The Building Energy Data Exchange Specification (BEDES), developed by DOE, is ...

  5. Heating System Modernization, Management of Peripheral Scope...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report,...

  6. TAPERED DEFINING SLOT

    DOE Patents [OSTI]

    Pressey, F.W.

    1959-09-01

    An improvement is reported in the shape and formation of the slot or opening in the collimating slot member which forms part of an ion source of the type wherein a vapor of the material to be ionized is bombarded by electrons in a magnetic field to strike an arc-producing ionization. The defining slot is formed so as to have a substantial taper away from the cathode, causing the electron bombardment from the cathode to be dispersed over a greater area reducing its temperature and at the same time bringing the principal concentration of heat from the electron bombardment nearer the anode side of the slot, thus reducing deterioration and prolonging the life of the slot member during operation.

  7. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect (OSTI)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  8. EIS-0512: Notice of Public Scoping Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska LNG Project, Alaska Summary The Federal Energy Regulatory Commission (FERC) announced scoping meetings it will conduct for an EIS that will analyze the potential environmental impacts of a proposal to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope. The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export (marine)

  9. West Valley Demonstration Project Administrative Consent Order...

    Office of Environmental Management (EM)

    West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 State New York Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Establish ...

  10. Interviewee Travel Regulations Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and

  11. Residential ventilation standards scoping study

    SciTech Connect (OSTI)

    McKone, Thomas E.; Sherman, Max H.

    2003-10-01

    The goals of this scoping study are to identify research needed to develop improved ventilation standards for California's Title 24 Building Energy Efficiency Standards. The 2008 Title 24 Standards are the primary target for the outcome of this research, but this scoping study is not limited to that timeframe. We prepared this scoping study to provide the California Energy Commission with broad and flexible options for developing a research plan to advance the standards. This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the ventilation needs of California residences, determining the bases for setting residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and corresponding levels of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  12. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  13. Lake Charles CCS Project

    SciTech Connect (OSTI)

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  14. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility ...

  15. Introduction to HelioScope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HelioScope Paul Grana Presented at the 2013 Sandia PV Performance Modeling Workshop Santa Clara, CA, May 1-2, 2013 Published by Sandia National Laboratories with the Permission of the Author HelioScope 101 Similar to Typical Performance Models:  Use standard weather inputs (TMY3, etc.)  Hourly 8760 production analysis  Return system AC energy (inverter AC out) Different from Typical Performance Models:  Component-Driven  Design-Integrated  Cloud-Based Structure of the Model

  16. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183- Jun. 15, 2011

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  17. Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-07

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  18. Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Participants in Scoping (CEQ, 1981) Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping (CEQ, 1981) This Council on Environmental ...

  19. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Pseudo-Single-Bunch Expands Experimental Scope Print Wednesday, 25 September 2013 00:00 Initial tests of a new pseudo-single-bunch...

  20. Sandia defines solar variability zones

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    defines solar variability zones - Sandia Energy Energy Search Icon Sandia Home Locations ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  1. Buildings of the Future Scoping Study: A Framework for Vision Development

    SciTech Connect (OSTI)

    Wang, Na; Goins, John D.

    2015-02-01

    The Buildings of the Future Scoping Study, funded by the U.S. Department of Energy (DOE) Building Technologies Office, seeks to develop a vision for what U.S. mainstream commercial and residential buildings could become in 100 years. This effort is not intended to predict the future or develop a specific building design solution. Rather, it will explore future building attributes and offer possible pathways of future development. Whether we achieve a more sustainable built environment depends not just on technologies themselves, but on how effectively we envision the future and integrate these technologies in a balanced way that generates economic, social, and environmental value. A clear, compelling vision of future buildings will attract the right strategies, inspire innovation, and motivate action. This project will create a cross-disciplinary forum of thought leaders to share their views. The collective views will be integrated into a future building vision and published in September 2015. This report presents a research framework for the vision development effort based on a literature survey and gap analysis. This document has four objectives. First, it defines the project scope. Next, it identifies gaps in the existing visions and goals for buildings and discusses the possible reasons why some visions did not work out as hoped. Third, it proposes a framework to address those gaps in the vision development. Finally, it presents a plan for a series of panel discussions and interviews to explore a vision that mitigates problems with past building paradigms while addressing key areas that will affect buildings going forward.

  2. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  3. EIS-0512: Notice of Public Scoping Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Federal Energy Regulatory Commission (FERC) announced scoping meetings it will conduct for an EIS that will analyze the potential environmental impacts of a proposal to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope. The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export (marine) terminal, and associated

  4. April 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE’s portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 34 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  5. January 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  6. December 2015 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  7. 2012 CERTS LAAR Program Peer Review - Scoping Study on Industrial Regulation - Nasr Alkadi, ORNL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nasr Alkadi, Ph.D. Michael Starke, PhD Oak Ridge National Laboratory CERTS Internal Program Review FY12 DOE-CERTS Transmission Reliability R&D at Lawrence Berkeley National Laboratory. Scoping Study on Industrial Regulation September 20, 2012 2 Managed by UT-Battelle for the U.S. Department of Energy Project objective: Scoping of Regulation Reserves in Industrial Sector 2 Alcoa's Smelting Process is a significant regulation asset at Warrick, IN. * Alcoa has demonstrated Regulation Band in

  8. Software-Defined Networking (SDN)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENOS Experimental Network Testbeds Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Science Engagement Move your data Programs & Workshops Science Requirements Reviews Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Network R&D » Software-Defined Networking (SDN) Network R&D Software-Defined Networking (SDN) ENOS Experimental

  9. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    SciTech Connect (OSTI)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  10. Mk12A/W78 ground test project (u)

    SciTech Connect (OSTI)

    Stokes, Kyle R

    2010-12-01

    The slides present the scope, objectives and status of the Mk12A1W78 Ground Test Project for the purpose of updating the ICBM Project Officers Group. In addition, project constraints and risks are discussed.

  11. Draft - DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  12. Scoping Meeting Summary, Waimea, Hawai'i, March 16, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-10

    The meeting began with presentations by the facilitator and the representative from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process. A number of process issues were covered, including the current State dependence on imported petroleum (>90%), the public nature of the DOE EIS process, DOE's responsibility to consider general impacts to the global situation, and database availability. Dr. Lewis assured those present that the EIS would examine transmission system/cable-related impacts and alternatives to the proposed action, within geothermal and outside it (including coal), including different mixes of supply- or demand-side options on each island using an integrated resource planning approach. With respect to prior and on-going geothermal developments in Puna, Dr. Lewis explained that although DOE will not conduct new environmental reviews of the HGP(A) and other federal geothermal development in Puna, these and the present developments will be considered (including medical records) from the perspective of cumulative impacts.

  13. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  14. EIS-0501: FERC Project Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass LNG terminal and pipeline project, FERC issued a project update that announced that, due to changes in the project location and scope, it would prepare an EIS instead. DOE, Office of Fossil Energy - a cooperating agency in preparing the EIS - has an obligation under Section 3 of the Natural Gas Act to authorize the

  15. Final EIS for Champlain Hudson Power Express Transmission Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project CEQ Releases Two Handbooks on Improving Efficiency of Federal ...

  16. Pantex High Pressure Fire Loop Project Completed On Time, Under...

    National Nuclear Security Administration (NNSA)

    Using underruns generated from these savings, the Integrated Project Team added scope through the Baseline Change Proposal process. Two 400,000-gallon fire protection water supply ...

  17. Scoping Materials | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room SEIS for the Production of Tritium in a Commercial Light Water Reactor Scoping...

  18. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section...

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities...

  19. Determining the appropriate scope: Assessing at the ecosystem level

    SciTech Connect (OSTI)

    Southerland, M.T.

    1995-12-01

    Traditional approaches to determining the scope of environmental impact assessment have been based on an ad hoc selection of issues by the project proponent and other interested parties. Resulting in an inadequate consideration of both cumulative effects and impacts on biodiversity. Although public involvement in scoping the assessment must by resource-oriented, rather than activity-oriented, the appropriate scope of environmental impact assessment is the ecosystem. Drawing from the Council on Environmental Quality (CEQ) guidance on the consideration of biodiversity under the National Environmental Policy Act (NEPA) and the growing consensus on principles of ecosystem management, scoping should begin with the large-scale ecosystem focusing on essential components potentially affected by the project to determine the appropriate bounds for the study. Although the science of analyzing ecosystems has many limitation, progress in improving environmental impact assessment can be made at any of the three increasingly difficult steps in assessing at the ecosystem level: (1) The first step involves bounding the assessment within the regional context to address cumulative effects and biodiversity. The adoption of a landscape scale has proven to be the most effective solution to the problems of setting boundaries for study units in time and space that do not omit important sources, endpoints (indicators), or processes. (2) The second step involves the use of higher-level indicators to characterize biodiversity and ecosystem integrity. Useful measures include community indices of biological integrity and landscape parameters such as habitat composition and fragmentation. (3) The third step involves identifying ecosystem thresholds (i.e., carrying capacities) to analyze the significance of cumulative impacts. Trends analysis can help identify potential threshold effects when process models are not available.

  20. Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping (CEQ, 1981)

    Broader source: Energy.gov [DOE]

    This Council on Environmental Quality scoping guidance document consists of advice on what works and what does not, based on the experience of many agencies and other participants in scoping. It is intended to make generally available the results of the Council's research, and to encourage the use of better techniques for ensuring public participation and efficiency in the scoping process.

  1. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Actual FY 2013 Pre- & Post-CAP* Actual Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 83% Construction 84% Cleanup 82% 70% Pre-CAP 84% Post-CAP Based on 3-year rolling period (FY11 to FY13) of 93 projects. TPC is Total Project Cost.

  2. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  3. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  4. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  5. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  7. Template:GeothermalProject | Open Energy Information

    Open Energy Info (EERE)

    navigation, search This is the 'GeothermalProject' template. To define a new Geothermal Development Project, please use the Geothermal Development Project Form. Parameters Place...

  8. EA-1980: Public Scoping Notice | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Public Scoping Notice EA-1980: Public Scoping Notice Spar Canyon-Round Valley Access ... PDF icon EA-1980-PublicScopingLetter-2014.pdf More Documents & Publications 2014 Annual ...

  9. Meeting Summary for HTF PA Scoping | Department of Energy

    Office of Environmental Management (EM)

    for HTF PA Scoping Meeting Summary for HTF PA Scoping Meeting Notes for the Savannah River Site H-Area Tank Farm Performance Assessment Scoping Meeting PDF icon Savannah River Site...

  10. Environmental Restoration Projects

    Office of Environmental Management (EM)

    3.0 5 15.0 A6 Forecast of Cost at Completion P 3.0 NA 0.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Cost 51.0 150.0 B1 Project Schedule H 7.5 ...

  11. Facility Disposition Projects

    Office of Environmental Management (EM)

    A6 Forecast of Cost at Completion P 3.0 NA 0.0 3 9.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 5 15.0 Subtotal Cost 36.0 133.5 150.0 B1 Project ...

  12. California's Climate Change Proposed Scoping Plan | Open Energy...

    Open Energy Info (EERE)

    Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan AgencyCompany Organization State of California Resource...

  13. Report Now Available: DC Microgrids Scoping Study--Estimate of...

    Office of Environmental Management (EM)

    Report Now Available: DC Microgrids Scoping Study--Estimate of Technical and Economic Benefits (March 2015) Report Now Available: DC Microgrids Scoping Study--Estimate of Technical ...

  14. Section 54: Scope of Compliance Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scope of Compliance Assessments (40 CFR § 194.54) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Scope of Compliance Assessments (40 CFR § 194.54) Table of Contents 54.0 Scope of Compliance Assessments (40 CFR § 194.54) 54.1 Requirements 54.2 Background 54.3 1998 Certification Decision 54.4 Changes in the CRA-2004 54.5 EPA's Evaluation of Compliance for the 2004 Recertification 54.6 Changes

  15. Contract/Project Management

    Office of Environmental Management (EM)

    3 Third Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  16. Defining coiled tubing limits -- A new approach

    SciTech Connect (OSTI)

    Newman, K.R.; Sathuvalli, U.B.; Stone, L.R.; Wolhart, S.

    1996-12-31

    The burst, collapse and axial load operating limits for Coiled Tubing (CT) are currently established using the Von Mises incipient yield criterion. This criterion has historically been used to calculate the limits for oil country tubular goods (OCTG). The limits according to this criterion are based on the point at which the pipe material reaches a load state in which it begins to yield. Because of the bending that occurs when the CT is spooled on and off the reel, and when it is bent over the guide arch, the CT is already far beyond the yield point before it enters a well. Thus, this criterion does not really apply to CT. This paper describes a research project currently in progress. The purpose of this project is to define a new set of CT limits based on criteria other than incipient yield. This new approach to setting CT operating limits takes into account the internal residual stresses in the CT which are a consequence of repeated bending cycles and the accompanying change in material properties.

  17. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly...

  18. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Pseudo-Single-Bunch Expands Experimental Scope Print Wednesday, 25 September 2013 00:00 Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in

  19. Report: Acquisition, Project Management, and Quality Assurance

    Office of Environmental Management (EM)

    ... into a performance baseline with scope, costs, and schedules based on an immature design ... EM's project reporting, analyses, and forecasting. o EM plans to move to a web-based ...

  20. Commercial Building Energy Alliance Exterior Lighting Scoping Study

    SciTech Connect (OSTI)

    Myer, Michael

    2011-10-07

    This report is a scoping study about challenges and energy saving potential regarding exterior lighting.

  1. Scoping Study Investigating PWR Instrumentation during a Severe Accident Scenario

    SciTech Connect (OSTI)

    Rempe, J. L.; Knudson, D. L.; Lutz, R. J.

    2015-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) and Fukushima Daiichi Units 1, 2, and 3 nuclear power plants demonstrate the critical importance of accurate, relevant, and timely information on the status of reactor systems during a severe accident. These events also highlight the critical importance of understanding and focusing on the key elements of system status information in an environment where operators may be overwhelmed with superfluous and sometimes conflicting data. While progress in these areas has been made since TMI-2, the events at Fukushima suggests that there may still be a potential need to ensure that critical plant information is available to plant operators. Recognizing the significant technical and economic challenges associated with plant modifications, it is important to focus on instrumentation that can address these information critical needs. As part of a program initiated by the Department of Energy, Office of Nuclear Energy (DOE-NE), a scoping effort was initiated to assess critical information needs identified for severe accident management and mitigation in commercial Light Water Reactors (LWRs), to quantify the environment instruments monitoring this data would have to survive, and to identify gaps where predicted environments exceed instrumentation qualification envelop (QE) limits. Results from the Pressurized Water Reactor (PWR) scoping evaluations are documented in this report. The PWR evaluations were limited in this scoping evaluation to quantifying the environmental conditions for an unmitigated Short-Term Station BlackOut (STSBO) sequence in one unit at the Surry nuclear power station. Results were obtained using the MELCOR models developed for the US Nuclear Regulatory Commission (NRC)-sponsored State of the Art Consequence Assessment (SOARCA) program project. Results from this scoping evaluation indicate that some instrumentation identified to provide critical information would be exposed to conditions that

  2. Microsoft PowerPoint - 1_FG2 scoping_DOE NEPA [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Fossil Energy AGENDA Welcome - Cliff Whyte (DOE-NETL) Background and DOE's Role - Jeff Hoffmann (DOE-NETL) Ameren Project Overview - Mike Long (Ameren) FG Alliance Project Overview - Gordon Beeman (June 7, 8) (FG Alliance) - Ken Humphreys (June 9) (FG Alliance) NEPA Process - Cliff Whyte (DOE-NETL) Public Comments Office of Fossil Energy FutureGen 2.0 Program and the National Environmental Policy Act Public Scoping Meetings - June 7-9, 2011 3 Office of Fossil Energy National

  3. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  4. Project quality assurance plant: Sodium storage facility, project F-031

    SciTech Connect (OSTI)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.

  5. PGDP Deactivation Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GDP Transition » PGDP Deactivation Project PGDP Deactivation Project PGDP Deactivation Project scope major activities: Site Optimization Studies include: - Steam, Air, Nitrogen and Chilled Water Optimization Study - Water Treatment Facility Optimization Study - C-100 Optimization Study - Sewer Evaluation Study Facility Stabilization Preparation and/or removal of nuclear materials and contaminants from facilities. Stabilization activities are performed during early stages of facility

  6. Scoping study: Substation design workstation

    SciTech Connect (OSTI)

    Mauser, S.F. ); Conroy, M.W. ); Singh, N.M. )

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  7. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    SciTech Connect (OSTI)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-06-15

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at {approx}95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite [U(IV)] and metaschoepite [U(VI)]. This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water ({approx}95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO{sub 2} and eliminate H{sub 2} generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  8. Section 32: Scope of Performance Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Assessments (40 CFR § 194.32) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Scope of Performance Assessments (40 CFR § 194.32) Table of Contents 32.0 Scope of Performance Assessments (40 CFR § 194.32) 32.1 Requirements 32.2 Background 32.3 1998 Certification Decision 32.3.1 40 CFR § 194.32(a) 32.3.2 40 CFR § 194.32(b) 32.3.3 40 CFR § 194.32(c) 32.3.4 40 CFR § 194.32(d)

  9. Applying value engineering and modern assessment tools in managing NEPA: Improving effectiveness of the NEPA scoping and planning process

    SciTech Connect (OSTI)

    ECCLESTON, C.H.

    1998-09-03

    While the National Environmental Policy Act (NEPA) implementing regulations focus on describing ''What'' must be done, they provide surprisingly little direction on ''how'' such requirements are to be implemented. Specific implementation of these requirements has largely been left to the discretion of individual agencies. More than a quarter of a century after NEPA's enactment, few rigorous tools, techniques, or methodologies have been developed or widely adopted for implementing the regulatory requirements. In preparing an Environmental Impact Statement, agencies are required to conduct a public scoping process to determine the range of actions, alternatives, and impacts that will be investigated. Determining the proper scope of analysis is an element essential in the successful planning and implementation of future agency actions. Lack of rigorous tools and methodologies can lead to project delays, cost escalation, and increased risk that the scoping process may not adequately capture the scope of decisions that eventually might need to be considered. Recently, selected Value Engineering (VE) techniques were successfully used in managing a prescoping effort. A new strategy is advanced for conducting a pre-scoping/scoping effort that combines NEPA with VE. Consisting of five distinct phases, this approach has potentially wide-spread implications in the way NEPA, and scoping in particular, is practiced.

  10. Quarry residuals RI/FS scoping document. [Weldon Spring quarry

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The purpose of this document is to serve as a planning tool for the implementation of the Quarry Residual Remedial Investigation/Feasibility Study (RI/FS) process and to provide direct input to revising and updating the 1988 Work Plan for the Weldon Spring Site Remedial Action Project (WSSRAP) Remedial Investigation/Feasibility Study-Environmental Impact Statement for the Weldon Spring Site (RI/FS-EIS) (Peterson et al. 1988) for this effort. The scoping process is intended to outline the tasks necessary to develop and implement activities in compliance with the Comprehensive Environmental Response, Compensation and Liability Act-National Environmental Policy Act (CERCLA-NEPA) process from detailed planning through the appropriate decision document. In addition to scoping the entire process, this document will serve as the primary tool for planning and accomplishing all activities to be developed in the Quarry Residual RI/FS Work Plan. Subsequent tasks are difficult to plan at this time. 10 refs., 5 figs., 5 tabs.

  11. EIS-0286: Notice of Revised Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

  12. RUS Bulletin 1794-A-603: Scoping Guide | Open Energy Information

    Open Energy Info (EERE)

    3: Scoping Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: RUS Bulletin 1794-A-603: Scoping...

  13. Property:NEPA ScopingInitiatedDate | Open Energy Information

    Open Energy Info (EERE)

    ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  14. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A)

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities (RTBF) and Site Stewardship 110 Secure Transportation Asset (STA) 125 Security (Physical and Cyber) 160 Other NNSA/Other DOE 310 includes ICO and Emergency Response Non-DOE (Work for Others) 360 Total FTE's 2,654 *FTEs shown include allocation of indirect FTE's

  15. Building Energy Data Exchange Specification Scoping Report | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Data Exchange Specification Scoping Report Building Energy Data Exchange Specification Scoping Report The Building Energy Data Exchange Specification (BEDES), developed by DOE, is a uniform format is intended to make it easier for external stakeholders to use DOE tools, streamline reporting for DOE programs, and help unlock the full utility of the data that the DOE collects. Download the Building Energy Data Exchange Specification Scoping Report below bedes_scoping_080113.pdf (1.37

  16. 2010 Manufacturing Energy and Carbon Footprints: Scope | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Scope 2010 Manufacturing Energy and Carbon Footprints: Scope This five-page document provides detailed descriptions of the manufacturing sectors examined in the Energy and Carbon Footprints (MECS 2010) Scope of the Manufacturing Energy and Carbon Footprints (MECS 2010) (330.09 KB) More Documents & Publications Manufacturing Energy and Carbon Footprints Scope End-Use Sector Flowchart U.S. Manufacturing Energy Use and Greenhouse Gas Emissions Analysis

  17. Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach This slideshow explains the scope and goals of the first year of the Quadrennial Energy Review (QER). The first year of the QER focuses on energy transmission, storage, and distribution (TS&D). Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach (14.75 MB) More Documents & Publications QER - Comment of Powder

  18. Advanced Nuclear Energy Projects Solicitation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Solicitation Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION Solicitation and Supplements I, II, and III (January 19, 2016). Applicants should review the final solicitation and all supplements before submitting an application. The full download above contains the following documents listed below: Solicitation (December 10, 2014) Supplement I regarding Scope of Projects Eligible for the Solicitation (June 23, 2015)

  19. SNF sludge treatment system preliminary project execution plan

    SciTech Connect (OSTI)

    Flament, T.A.

    1998-03-03

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS.

  20. Social impact assessment - new dimensions in project planning

    SciTech Connect (OSTI)

    Jones, M.G.; Hartog, J.J.; Sykes, R.M.

    1996-11-01

    The Objective of the presentation is to provide understanding of how to improve attention to the social dimensions of EP projects. Social Impacts are the consequences to human populations, communities or individuals resulting from a project or activity. Such impacts may change the way in which people live, relate to one another, organize and cope as members of society. There is an increasing demand and expectation that Exploration and Production activities will both understand their impacts and define benefits for the local communities. Social Impact Assessment can be considered a branch of Environmental Impact Assessment. It has become a tool in its own fight due to the focus that was paid to the natural and physical issues within the EIA process. However there are still strong alignments and the wise project planner will integrate social and environmental issues within their project planning process. This can be done through a combination of studies but can result in a single report. The benefits of SIA will be demonstrated to include: (1) obtaining approvals (2) forward planning and design (3) increased project success-benefits to local community (4) economic benefits (5) decision making by management The types of impacts including demographic, socioeconomic, health, social infrastructure, resources, psychological and community, cultural and social equity will be reviewed. Methods and techniques to identify and assess impacts will be addressed. One of the main challenges in SIA is to reach the right audience. Methods to scope studies and implement consultation will be addressed.

  1. Define the Game Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Technology Catalyst » Define the Game Plan Define the Game Plan Define the Game Plan A successful High Impact Technologies (HIT) Catalyst program will help stakeholders, including utilities, federal agencies, building owners and operators, nonprofits, and others take advantage of energy and cost savings by implementing available high impact technologies. Based on predefined decision criteria, as laid out in the graphic above, DOE evaluates which market stimulation activities will

  2. Tribal Renewable Energy Webinar: Project Development for Long Term Tribal Energy

    Broader source: Energy.gov [DOE]

    The webinar will cover how to determine project savings and production potential estimates, define project options, refine the project, implement the project, and plan for operations and maintenance.

  3. ONLY HERE...Will You Define the ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONLY HERE...Will You Define the Future of Energy Application deadline: December 21, 2015 The Mickey Leland Energy Fellowship (MLEF) Program provides college students with an ...

  4. Fast Flux Test Facility Closure Project - Project Management Plan

    SciTech Connect (OSTI)

    BEACH, R.R.

    2002-09-26

    The Fast Flux Test Facility (FFTF) Closure Project, Project Management Plan, Revision 5, provides the scope, cost, and schedule to achieve the most cost effective and expeditious closure of the FFTF to an assumed final end-state with the reactor vessel and the containment building, below the 5504 grade level, being entombed in place. Closure will be completed by December 2009 at a cost of $547 million.

  5. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Office of Environmental Management (EM)

    Project Execution Example Example 73 6.3 Project Approach The overall schedule strategy for the PFP project includes ongoing minimum safe activities, combined with stabilization of materials followed by materials disposition, and subsequent transition of the PFP complex to a decommissioned state. The PFP material stabilization baseline was developed using a functionally-based work WBS. The WBS defines all activities required to take each material stream from their current location/conditions

  6. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  7. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  8. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  9. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  10. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  11. Project W-420 Stack Monitoring system upgrades conceptual design report

    SciTech Connect (OSTI)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  12. Bilayer graphene quantum dot defined by topgates

    SciTech Connect (OSTI)

    Müller, André; Kaestner, Bernd; Hohls, Frank; Weimann, Thomas; Pierz, Klaus; Schumacher, Hans W.

    2014-06-21

    We investigate the application of nanoscale topgates on exfoliated bilayer graphene to define quantum dot devices. At temperatures below 500 mK, the conductance underneath the grounded gates is suppressed, which we attribute to nearest neighbour hopping and strain-induced piezoelectric fields. The gate-layout can thus be used to define resistive regions by tuning into the corresponding temperature range. We use this method to define a quantum dot structure in bilayer graphene showing Coulomb blockade oscillations consistent with the gate layout.

  13. Preliminary design requirements document for Project W-378, low-level waste vitrification plant

    SciTech Connect (OSTI)

    Swanson, L.M.

    1995-03-31

    The scope of this preliminary Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to accomplish vitrification and disposal of the pretreated low-level waste (LLW) fraction of the Hanford Site tank waste. This document sets forth function requirements, performance requirements and design constraints necessary to begin conceptual design for the Low-Level Waste Vitrification Plant (LLWVP). System and physical interfaces between the LLWVP Project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. The design requirements provided in this document will be augmented by additional detailed design data to be documented by the project.

  14. Form:Define | Open Energy Information

    Open Energy Info (EERE)

    into this field will be used as the name of the term being defined. Example terms Reduced T&D Operations Cost Power Cyber Security Incident ... further results Retrieved from...

  15. Program Evaluation: Define Questions and Methods

    Broader source: Energy.gov [DOE]

    Steps five through eight will help you define the questions your evaluation should address, and develop the methods you'll use to conduct your evaluation (learn more about the other steps in...

  16. Scoping Meeting Summary, Wailuku, Maui, March 9, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-06

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the program director from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role in ensuring the impartiality and fairness of the meeting. Dr. Lewis further defined the scope of the project, introduced members of the EIS team, briefly described the EIS process, and answered several process questions, noting that cable feasibility would be examined and that Native Hawaiian concerns would be addressed. Ms. Borgstrom stated that the ISIS Implementation Plan will be continuously refined and that impacts of reasonably foreseeable future activities would be examined. During the meeting, more than 90% of the commenters requested that the EIS identify and assess the relative merits and impacts of energy alternatives to the proposed action. Nearly 80% requested that the EIS investigate conservation and renewable forms of energy, such as wind, solar, and biomass. They suggested that integrated resource planning should be used, noting that the State is initiating such a process. More than 30% of the commenters asked that the EIS examine geothermal alternatives to the action including developing geothermal resources on Maui and using geothermal power on Hawai'i only on that island. One commenter proposed an alternative cable route that proceeds from Hawai'i to Lana'i and from Lana'i to Oahu with spur lines to Moloka'i and Maui as needed. Nearly 70% of the commenters made general statements concerning potential short- and long-term environmental costs and impacts of the HGP (particularly on pristine environments). Others were concerned about environmental costs to Maui, particularly the impacts of a land-based cable route on the south side of Maui and on Hawaiian homestead lands. More than half the

  17. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Training and Qualification Plan Examples Example 66 8.2.2 Personnel Training and Qualification The Personnel Training and Qualification program is being established as defined by laws, DOE Orders, and company directives to ensure that personnel are trained and qualified to perform assigned tasks. The training and qualification program develops personnel proficiency commensurate with the scope, complexity, and nature of an assigned activity. Management is responsible for developing staff position

  18. International scoping study: accelerator working group report

    SciTech Connect (OSTI)

    Zisman, Michael; Zisman, M.S.

    2006-09-30

    During the past several years, an International Scoping Study (ISS) of a Neutrino Factory was carried out, with the aim of developing an internationally accepted baseline facility design. Progress toward that goal will be described. Many of the key technical aspects of a Neutrino Factory facility design are presently being investigated experimentally, and the status of these investigations will be mentioned. Plans for the recently launched International Design Study (IDS), which serves as a follow-on to the ISS, will be briefly described.

  19. doe eis public scoping meeting.ptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 2 3 DEPARTMENT OF ENERGY 4 5 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT 6 STATEMENT FOR THE ACQUISITION OF A NATURAL GAS PIPELINE AND NATURAL GAS UTILITY SERVICE AT THE HANFORD SITE, 7 RICHLAND, WASHINGTON, AND NOTICE OF FLOODPLAINS AND WETLANDS INVOLVEMENT 8 9 10 DOE/EIS-0467 11 12 13 PUBLIC SCOPING MEETING 14 15 February 9, 2012 16 7:00 p.m. 17 Red Lion Hotel and Conference Center 18 Pasco, Washington 19 20 21 22 BRIDGES REPORTING & LEGAL VIDEO 23 Certified Shorthand Reporters

  20. EIS-0465: Announcement of Public Scoping Meetings

    Broader source: Energy.gov [DOE]

    Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware

  1. U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-07-22

    This DOE Guide provides a tailored model of the CII PDRI for traditional construction projects for use by the DOE programs, as it may apply and is appropriate, when reviewing the levels of adequacy of project scope definition during the project development stages. Admin Chg 1 dated 10-22-2015.

  2. EIS-0489: Notice of Comment Period Extension and Additional Scoping...

    Broader source: Energy.gov (indexed) [DOE]

    FERC announces the extension of the public comment periond and additional scoping meetings. The comment period has been extended from September 4, 2012 to October 29, 2012. For ...

  3. EIS-0463: Extension of Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 EIS-0463: Notice of Intent to Prepare a Supplement to the Draft Environmental...

  4. Bureau of Land Management - Examples of Scoping Reports | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Bureau of Land Management - Examples of Scoping ReportsPermittingRegulatory GuidanceSupplemental Material...

  5. Microsoft PowerPoint - Final CLWR SEIS PUBLIC SCOPING PRESENTATION...

    National Nuclear Security Administration (NNSA)

    Impact Statement for the Impact Statement for the Production of Tritium in a Commercial Light Water Commercial Light Water Reactor Public Scoping Meeting October 20 2011 October ...

  6. EIS-0391: Notice to Extend Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) and rescheduling the public scoping meetings. PDF icon EIS-0391-NOI-scop-2006....

  7. A SCOPING STUDY: Development of Probabilistic Risk Assessment Models for Reactivity Insertion Accidents During Shutdown In U.S. Commercial Light Water Reactors

    SciTech Connect (OSTI)

    S. Khericha

    2011-06-01

    This report documents the scoping study of developing generic simplified fuel damage risk models for quantitative analysis from inadvertent reactivity insertion events during shutdown (SD) in light water pressurized and boiling water reactors. In the past, nuclear fuel reactivity accidents have been analyzed both mainly deterministically and probabilistically for at-power and SD operations of nuclear power plants (NPPs). Since then, many NPPs had power up-rates and longer refueling intervals, which resulted in fuel configurations that may potentially respond differently (in an undesirable way) to reactivity accidents. Also, as shown in a recent event, several inadvertent operator actions caused potential nuclear fuel reactivity insertion accident during SD operations. The set inadvertent operator actions are likely to be plant- and operation-state specific and could lead to accident sequences. This study is an outcome of the concern which arose after the inadvertent withdrawal of control rods at Dresden Unit 3 in 2008 due to operator actions in the plant inadvertently three control rods were withdrawn from the reactor without knowledge of the main control room operator. The purpose of this Standardized Plant Analysis Risk (SPAR) Model development project is to develop simplified SPAR Models that can be used by staff analysts to perform risk analyses of operating events and/or conditions occurring during SD operation. These types of accident scenarios are dominated by the operator actions, (e.g., misalignment of valves, failure to follow procedures and errors of commissions). Human error probabilities specific to this model were assessed using the methodology developed for SPAR model human error evaluations. The event trees, fault trees, basic event data and data sources for the model are provided in the report. The end state is defined as the reactor becomes critical. The scoping study includes a brief literature search/review of historical events, developments of

  8. Major Risk Factors to the Integrated Facility Disposition Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy to the Integrated Facility Disposition Project Major Risk Factors to the Integrated Facility Disposition Project The scope of the Integrated Facility Disposition Project (IFDP) needs to comprehensively address a wide range of environmental management risks at the Oak Ridge Reservation (ORO). Major Risk Factors to the Integrated Facility Disposition Project (227.35 KB) More Documents & Publications Major Risk Factors Integrated Facility Disposition Project - Oak Ridge

  9. Project Definition Rating Index (PDRI) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Definition Rating Index (PDRI) Project Definition Rating Index (PDRI) The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for EM's projects. EM-PDRI Team members represent a number of EM sites, and have already used this project planning tool successfully. The EM-PDRI examines a wide range of project factors related to cost, scope, and schedule, and

  10. Project management plan for Project W-320, Tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Phillips, D.R.

    1994-12-01

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

  11. The scope of the Weatherization Assistance Program: Profile of the population in need

    SciTech Connect (OSTI)

    Eisenberg, J.F.; Michels, E.; Carroll, D.; Berdux, N.

    1994-03-01

    The U.S. Department of Energy (DOE) is conducting a national evaluation of its Weatherization Assistance Program, an energy efficiency program that provides financial assistance to qualifying low-income households for the {open_quotes}weatherization{close_quotes} of their housing units. The evaluation, being conducted for the Department by Oak Ridge National Laboratory (ORNL), is comprised of five studies. One of the five is a two-part analysis of the scope of the Weatherization Assistance Program and other resources devoted to low-income energy efficiency, including the number of dwellings weatherized to date and the population remaining to be served. This study is referred to here as the {open_quotes}Scope{close_quotes} study. This report presents the results of the second part of the {open_quotes}Scope{close_quotes} study, which investigates the characteristics of the population eligible for and in need of the DOE Weatherization Assistance Program - The Profile of the Population in Need. The {open_quotes}Profile{close_quotes} study is an attempt to use the Energy Information Administration`s Residential Energy Consumption Survey (RECS) for 1990 to define the weatherization-related characteristics of the low-income population. The RECS, a national survey with a sample size of 5,095 households, is the most reliable source for information regarding residential energy-use and housing characteristics because data is collected from fuel vendors on actual household energy bills and consumption for a large and representative sample of households.

  12. The Scope of the Weatherization Assistance Program: Profile of the Population in Need

    SciTech Connect (OSTI)

    Eisenberg, J.F.

    1994-01-01

    The U.S. Department of Energy (DOE) is conducting a national evaluation of its Weatherization Assistance Program, an energy efficiency program that provides financial assistance to qualifying low-income households for the ''weatherization'' of their housing units. The evaluation, being conducted for the Department by Oak Ridge National Laboratory (ORNL), is comprised of five studies. One of the five is a two-part analysis of the scope of the Weatherization Assistance Program and other resources devoted to low-income energy efficiency, including the number of dwellings weatherized to date and the population remaining to be served. This study is referred to here as the ''Scope'' study. This report presents the results of the second part of the ''Scope'' study, which investigates the characteristics of the population eligible for and in need of the DOE Weatherization Assistance Program--The Profile of the Population in Need. The ''Profile'' study is an attempt to use the Energy Information Administration's Residential Energy Consumption Survey (RECS) for 1990 to define the weatherization-related characteristics of the low-income population. The RECS, a national survey with a sample size of 5,095 households, is the most reliable source for information regarding residential energy-use and housing characteristics because data is collected from fuel vendors on actual household energy bills and consumption for a large and representative sample of households.

  13. Software-defined Quantum Communication Systems

    SciTech Connect (OSTI)

    Humble, Travis S; Sadlier, Ronald J

    2014-01-01

    Quantum communication systems harness modern physics through state-of-the-art optical engineering to provide revolutionary capabilities. An important concern for quantum communication engineering is designing and prototyping these systems to prototype proposed capabilities. We apply the paradigm of software-defined communica- tion for engineering quantum communication systems to facilitate rapid prototyping and prototype comparisons. We detail how to decompose quantum communication terminals into functional layers defining hardware, software, and middleware concerns, and we describe how each layer behaves. Using the super-dense coding protocol as a test case, we describe implementations of both the transmitter and receiver, and we present results from numerical simulations of the behavior. We find that while the theoretical benefits of super dense coding are maintained, there is a classical overhead associated with the full implementation.

  14. TCP1 Defined Benefit Pension Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pension Plan (TCP1) TCP1 Defined Benefit Pension Plan Retirement income is based on your age, service credit, and highest-average salary at retirement. Contact Your Pension Resources (YPR) TCP1 Retirement Benefit Programs Pension Plan Retirement income is based on your age, service credit, and the average of your highest 36 consecutive month salaries calculated on your retirement date. In general, the older you are and the more service credit you have, the higher your retirement income will be.

  15. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  16. EA-1903-NoticeofScoping-2012.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zond Wind Energy Project Manhattan, Kansas The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Kansas State University (KSU) to ...

  17. Advanced CHP Control Algorithms: Scope Specification

    SciTech Connect (OSTI)

    Katipamula, Srinivas; Brambley, Michael R.

    2006-04-28

    The primary objective of this multiyear project is to develop algorithms for combined heat and power systems to ensure optimal performance, increase reliability, and lead to the goal of clean, efficient, reliable and affordable next generation energy systems.

  18. Microsoft PowerPoint - 2_FG2 scoping_DOE demonstration program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen 2.0 Jeff Hoffmann U.S. Department of Energy, Office of Major Demonstrations National Environmental Policy Act Public Scoping Meetings June 7-9, 2011 2 What is FutureGen 2.0? * U.S. DOE has awarded $1.05 Billion: - $590 million to Ameren, Babcock & Wilcox and American Air Liquide to test oxy-combustion technology at utility-scale - $459 million to FutureGen Alliance to transport and geologically store the CO 2 - Approximately $1.3B total project value including private cost share *

  19. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  20. Cementitious waste option scoping study report

    SciTech Connect (OSTI)

    Lee, A.E.; Taylor, D.D.

    1998-02-01

    A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

  1. Scoping Meeting Summary, Kaunakakai, Moloka'i, March 12, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-01

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the program manager from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced members of the EIS team, and briefly described.the EIS process. The overwhelming concerns of the meeting were Native Hawaiian issues. The presenters [more than 70%, most of whom addressed no other issue] want the EIS to respect Native Hawaiian religion, race, rights, language, and culture, noting that they believe that geothermal development is a desecration of Pele [{approx}60% of all presenters]. They expressed concern that their ancestors and burials should not be desecrated. The EIS should address Native Hawaiian concerns that the HGP would negatively impact Native Hawaiian fisheries, subsistence lifestyles, and religious practices. Virtually all the speakers expressed frustration with government. Most (> 70%) of the speakers voiced concern and frustration regarding lack of consideration for Native Hawaiians by government and lack of trust in government. One commenter requested that the EIS should consider the international implications of the U.S allowing their rainforests to be cleared, when the U.S. government asks other nations to preserve theirs. Nearly 30% of the commenters want the EIS to address the concern that people on Moloka'i will bear major environmental consequences of the HGP, but not gain from it. The commenters question whether it is right for Moloka'i to pay for benefits to Oahu, particularly using an unproven technology. After questioning the reliability and feasibility of the marine cable:, nearly 30% of the presenters were concerned about the impacts of the

  2. Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    The scope of this guide includes basic aspects of the development and maintenance of the plan for projects of any size and complexity for the benefit of the federal project director, who is approved by the acquisition executive, and incorporates contractor input as appropriate. Integrated project teams, program managers (if applicable), program offices, acquisition executives, and contractor project managers can also benefit from the suggestions in this guide. Admin Chg 1 dated 10-22-2015.

  3. Project Functions and Activities Definitions for Total Project Cost

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

  4. Example Retro-Commissioning Scope of Work to Include Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Document offers a ...

  5. Microsoft Word - FG2_scoping transcript_Tuscola06082011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... agreements; one with a DOE 8 award of approximately 590 million to Ameren, Babcock 9 & Wilcox and American Air Liquide, and the scope of 10 that cooperative agreement is to ...

  6. Radiological Scoping Survey of the Scotia Depot, Scotia, NY

    SciTech Connect (OSTI)

    Bailey, E. N.

    2008-02-25

    The objectives of the radiological scoping survey were to collect adequate field data for use in evaluating the radiological condition of Scotia Depot land areas, warehouses, and support buildings.

  7. Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping

    Broader source: Energy.gov [DOE]

    As part of its continuing oversight of the implementation of the NEPA regulations, the Council on Environmental Quality has been investigating agency experience with scoping. This is the process by...

  8. EIS-0472: Notice of Public Scoping Meetings and Extension of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's ULP. On June 21, 2011, DOE announced in the Federal Register (76 FR 36097) its intention to prepare the PEIS and opened a scoping period which would have closed August 22,...

  9. RP-5 RENEWABLE ENERGY PROJECT

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2003-01-30

    This is the second quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of October 1, 2002 to December 31, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted in order to follow up on potential renewable energy technologies that were identified in the previous report; the technologies were analyzed for their feasibility, suitability and cost effectiveness for this project. This report covers the one-day conceptual design kickoff meeting that took place on November 4, 2002. The meeting was held to discuss the practicality and implementation of potential innovative technologies. Following the kickoff meeting, Inland Empire Utilities Agency (IEUA) and CH2M Hill, the Public Interest Energy Research (PIER) Consultant, held a meeting on December 2, 2002 to discuss the Conceptual Design Report outline and contents in order to clearly present each selected technology along with its evaluation, cost effectiveness and justification. A conference call also took place between the PIER Consultant and IEUA on December 13, 2002, to discuss the overall scope of work for this project. Major project activities in this period include expanded discussions on previous Energy Charrette decisions and recommendations, conceptual design kickoff meeting, conceptual design report, and deciding on the overall project scope of work.

  10. Scoping Inventory Calculations for the Rare Isotope Accelerator

    SciTech Connect (OSTI)

    Ahle, L E; Boles, J L

    2003-07-25

    This document is a report on our activities in FY03 exploring nuclear safety and hazard analysis issues relevant to the Rare Isotope Accelerator (RIA). It is not clear whether DOE will classify the RIA as an accelerator facility subject to the accelerator-specific safety requirements of DOE Order 420.2A or as a nonreactor nuclear facility subject to the requirements of 10 CFR 830. The final outcome of this issue will have significant impact on the construction and operation of the facility and the quality assurance requirements for items or services that may affect nuclear safety. The resolution of this issue will be an important earlier decision for the RIA project team and will require early consultation with the appropriate DOE authorities. For nuclear facilities, facility hazard classification depends on the inventory of releasable radionuclides; therefore, some simplistic, scoping inventory calculations for some assumed targets and beams are done to estimate the hazard category of RIA if it is declared a nuclear facility. These calculations show that for the scenarios analyzed, RIA would produce sufficient quantities of radionuclides to be classified as a Category 3 nuclear facility. Over the lifetime of RIA operations, it may be possible to build up Category 2 quantities of {sup 227}Ac and {sup 228}Th. A storage building, separate from the driver, target, and experimental buildings, used to store and isolate accumulated targets and other hardware, can mitigate the potential impact on RIA. The more onerous requirements of Category 2 facilities would only be imposed on the storage facility and not on the rest of the RIA facilities. Some of the differences in a category 2 and category 3 facility are discussed in Appendix 1.

  11. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    SciTech Connect (OSTI)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  12. Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 22, 2002-July 22, 2002 | Department of Energy Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 A report showing a comparative scooping economic analysis of 19 pathways for producing, handling, distributing, and dispensing hydrogen for fuel cell vehicle applications. 32525.pdf (1.48 MB) More Documents & Publications Analysis of a Cluster

  13. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  14. DC Microgrids Scoping Study: Estimate of Technical and Economic Benefits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (March 2015) | Department of Energy Microgrids Scoping Study: Estimate of Technical and Economic Benefits (March 2015) DC Microgrids Scoping Study: Estimate of Technical and Economic Benefits (March 2015) Microgrid demonstrations and deployments have shown the ability of microgrids to provide higher reliability and higher power quality than utility power systems and improved energy utilization. The vast majority of these microgrids are based on AC power, but some manufacturers, power system

  15. Federal Government Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as ... ESCOs in a similar climate zone (based on ASHRAE climate zones) or market segment (e.g., ...

  16. Probabilistic model better defines development well risks

    SciTech Connect (OSTI)

    Connolly, M.R.

    1996-10-14

    Probabilistic techniques to compare and rank projects, such as the drilling of development wells, often are more representative than decision tree or deterministic approaches. As opposed to traditional deterministic methods, probabilistic analysis gives decision-makers ranges of outcomes with associated probabilities of occurrence. This article analyzes the drilling of a hypothetical development well with actual field data (such as stabilized initial rates, production declines, and gas/oil ratios) to calculate probabilistic reserves, and production flow streams. Analog operating data were included to build distributions for capital and operating costs. Economics from the Monte Carlo simulation include probabilistic production flow streams and cost distributions. Results include single parameter distributions (reserves, net present value, and profitability index) and time function distributions (annual production and net cash flow).

  17. DOE Materials-Based Hydrogen Storage Summit: Defining Pathways...

    Office of Environmental Management (EM)

    Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive Applications DOE Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive ...

  18. Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Conference: Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. Citation Details In-Document Search Title: Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. Abstract ...

  19. Defining the Mechanisms of Friction: A Grand Challenge in Interfacial...

    Office of Scientific and Technical Information (OSTI)

    Defining the Mechanisms of Friction: A Grand Challenge in Interfacial Mechanics. Citation Details In-Document Search Title: Defining the Mechanisms of Friction: A Grand Challenge...

  20. Defining a Standard Metric for Electricity Savings

    SciTech Connect (OSTI)

    Brown, Marilyn; Akbari, Hashem; Blumstein, Carl; Koomey, Jonathan; Brown, Richard; Calwell, Chris; Carter, Sheryl; Cavanagh, Ralph; Chang, Audrey; Claridge, David; Craig, Paul; Diamond, Rick; Eto, Joseph H.; Fulkerson, William; Gadgil, Ashok; Geller, Howard; Goldemberg, Jose; Goldman, Chuck; Goldstein, David B.; Greenberg, Steve; Hafemeister, David; Harris, Jeff; Harvey, Hal; Heitz, Eric; Hirst, Eric; Hummel, Holmes; Kammen, Dan; Kelly, Henry; Laitner, Skip; Levine, Mark; Lovins, Amory; Masters, Gil; McMahon, James E.; Meier, Alan; Messenger, Michael; Millhone, John; Mills, Evan; Nadel, Steve; Nordman, Bruce; Price, Lynn; Romm, Joe; Ross, Marc; Rufo, Michael; Sathaye, Jayant; Schipper, Lee; Schneider, Stephen H; Sweeney, James L; Verdict, Malcolm; Vorsatz, Diana; Wang, Devra; Weinberg, Carl; Wilk, Richard; Wilson, John; Worrell, Ernst

    2009-03-01

    The growing investment by governments and electric utilities in energy efficiency programs highlights the need for simple tools to help assess and explain the size of the potential resource. One technique that is commonly used in this effort is to characterize electricity savings in terms of avoided power plants, because it is easier for people to visualize a power plant than it is to understand an abstraction such as billions of kilowatt-hours. Unfortunately, there is no standardization around the characteristics of such power plants. In this letter we define parameters for a standard avoided power plant that have physical meaning and intuitive plausibility, for use in back-of-the-envelope calculations. For the prototypical plant this article settles on a 500 MW existing coal plant operating at a 70percent capacity factor with 7percent T&D losses. Displacing such a plant for one year would save 3 billion kW h per year at the meter and reduce emissions by 3 million metric tons of CO2 per year. The proposed name for this metric is the Rosenfeld, in keeping with the tradition among scientists of naming units in honor of the person most responsible for the discovery and widespread adoption of the underlying scientific principle in question--Dr. Arthur H. Rosenfeld.

  1. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect (OSTI)

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  2. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  3. Demand Responsive Lighting: A Scoping Study

    SciTech Connect (OSTI)

    Rubinstein, Francis; Kiliccote, Sila

    2007-01-03

    The objective of this scoping study is: (1) to identify current market drivers and technology trends that can improve the demand responsiveness of commercial building lighting systems and (2) to quantify the energy, demand and environmental benefits of implementing lighting demand response and energy-saving controls strategies Statewide. Lighting systems in California commercial buildings consume 30 GWh. Lighting systems in commercial buildings often waste energy and unnecessarily stress the electrical grid because lighting controls, especially dimming, are not widely used. But dimmable lighting equipment, especially the dimming ballast, costs more than non-dimming lighting and is expensive to retrofit into existing buildings because of the cost of adding control wiring. Advances in lighting industry capabilities coupled with the pervasiveness of the Internet and wireless technologies have led to new opportunities to realize significant energy saving and reliable demand reduction using intelligent lighting controls. Manufacturers are starting to produce electronic equipment--lighting-application specific controllers (LAS controllers)--that are wirelessly accessible and can control dimmable or multilevel lighting systems obeying different industry-accepted protocols. Some companies make controllers that are inexpensive to install in existing buildings and allow the power consumed by bi-level lighting circuits to be selectively reduced during demand response curtailments. By intelligently limiting the demand from bi-level lighting in California commercial buildings, the utilities would now have an enormous 1 GW demand shed capability at hand. By adding occupancy and light sensors to the remotely controllable lighting circuits, automatic controls could harvest an additional 1 BkWh/yr savings above and beyond the savings that have already been achieved. The lighting industry's adoption of DALI as the principal wired digital control protocol for dimming ballasts and

  4. Scoping Meeting Summary, Honolulu, Oahu, March 14, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-10

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the representative from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced members of the EIS team, and briefly described the EIS process. Ninety percent of those presenting expressed concern about the potential impacts of the HGP to the environment. They asked that the EIS investigate the impacts of 1.he HGP on quality of air, water and soils, flora and fauna, land, socioeconomics, religion and culture. Seventy percent of the commenters want the EIS to investigate the impacts of all components of the HGP (eg. generation facilities, pipes, roads, drill pads, transmission corridors, and cable) on terrestrial ecosystems (e.g. the rainforest), threatened and endangered species, species diversity, species used for ritual or medicinal purposes, and climate stability. The EIS should address the effects of segmentation of habitat, introduction of exotic species, acid rain, herbicides, and enhanced fire danger. It should consider the entire Kilauea East Rift Zone when studying the impacts of HGP on the ecology of the Puna District. Of importance is the interrelationship between the lava, the biota of the region, and the regeneration that occurs following an eruption. DOE should examine the impacts of the network of roads that would be constructed for the HGP. Roads may serve as barriers that segment habitats, prevent regeneration and natural spread of biota, or serve as conduits for introduction of exotic species or for mobilization of herbicides. They may enhance the potential for logging or collecting of endangered native species. The EIS should determine the impacts

  5. Software-Defined Solutions for Managing Energy Use in Small Commercial Buildings

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lead Performer: University of California, Berkeley Project Partners: -- California Institute for Energy & Enviornment - Berkeley, CA -- Software Defined Buildings/EECS/UC Berkeley - Berkeley, CA -- Western Regional Cooling Center/UC Davis - Davis, CA -- Lawrence Berkeley National Laboratory - Berkeley, CA -- Building Robotics - Oakland, CA

  6. National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements

    SciTech Connect (OSTI)

    Schiller Consulting, Inc.; Schiller, Steven R.; Goldman, Charles A.; Galawish, Elsia

    2011-02-04

    This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national EM&V standard is that such a standard is

  7. The TITAN Reversed-Field Pinch fusion reactor study: Scoping phase report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    The TITAN research program is a multi-institutional effort to determine the potential of the Reversed-Field Pinch (RFP) magnetic fusion concept as a compact, high-power-density, and ''attractive'' fusion energy system from economic (cost of electricity, COE), environmental, and operational viewpoints. In particular, a high neutron wall loading design (18 MW/m/sup 2/) has been chosen as the reference case in order to quantify the issue of engineering practicality, to determine the physics requirements and plasma operating mode, to assess significant benefits of compact systems, and to illuminate the main drawbacks. The program has been divided into two phases, each roughly one year in length: the Scoping Phase and the Design Phase. During the scoping phase, the TITAN design team has defined the parameter space for a high mass power density (MPD) RFP reactor, and explored a variety of approaches to the design of major subsystems. Two major design approaches consistent with high MPD and low COE, the lithium-vanadium blanket design and aqueous loop-in-pool design, have been selected for more detailed engineering evaluation in the design phase. The program has retained a balance in its approach to investigating high MPD systems. On the one hand, parametric investigations of both subsystems and overall system performance are carried out. On the other hand, more detailed analysis and engineering design and integration are performed, appropriate to determining the technical feasibility of the high MPD approach to RFP fusion reactors. This report describes the work of the scoping phase activities of the TITAN program. A synopsis of the principal technical findings and a brief description of the TITAN multiple-design approach is given. The individual chapters on Plasma Physics and Engineering, Parameter Systems Studies, Divertor, Reactor Engineering, and Fusion Power Core Engineering have been cataloged separately.

  8. REDUCTIONS WITHOUT REGRET: DEFINING THE NEEDED CAPABILITIES

    SciTech Connect (OSTI)

    Swegle, J.; Tincher, D.

    2013-09-10

    This is the second of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as some closing thoughts for the future. This paper begins with a discussion of the current nuclear force and the plans and procurement programs for the modernization of that force. Current weapon systems and warheads were conceived and built decades ago, and procurement programs have begun for the modernization or replacement of major elements of the nuclear force: the heavy bomber, the air-launched cruise missile, the ICBMs, and the ballistic-missile submarines. In addition, the Nuclear Weapons Council has approved a new framework for nuclear-warhead life extension � not fully fleshed out yet � that aims to reduce the current number of nuclear explosives from seven to five, the so-called �3+2� vision. This vision includes three interoperable warheads for both ICBMs and SLBMs (thus eliminating one backup weapon) and two warheads for aircraft delivery (one gravity bomb and one cruise-missile, eliminating a second backup gravity bomb). This paper also includes a discussion of the current and near-term nuclear-deterrence mission, both global and regional, and offers some observations on future of the strategic deterrence mission and the challenges of regional and extended nuclear deterrence.

  9. Scoping study: Substation design workstation. Final report

    SciTech Connect (OSTI)

    Mauser, S.F.; Conroy, M.W.; Singh, N.M.

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  10. Spent Nuclear Fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-03

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  11. Award No. DE-FC36-10GO10589, Statement of Project Objectives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT OBJECTIVES 212 Degrees Consulting, LLC, Las Vegas, NV. Recovery Act: Demonstration project for deployment of alternative energy systems. A. PROJECT OBJECTIVES  Demonstrate the viability of wind turbine and solar cell generation systems within various urban environments, geographically located in areas conducive to solar and eolian technologies.  The demonstration project will show that at least 35% of the energy used within the test area is self generated. B. PROJECT SCOPE

  12. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  13. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  14. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  15. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  16. ESPC ENABLE Scope of Work Template and Guide

    Broader source: Energy.gov [DOE]

    Document provides a template to be drafted by the agency and presented to energy service company (ESCO) prior to the kickoff meeting for the investment grade audit (IGA). The scope of work (SOW) will then be included in the ESCO's final proposal, which is presented to the agency after the IGA and prior to final negotiations.

  17. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  18. Field-Reversed Configuration Power Plant Critical-Issue Scoping Study

    SciTech Connect (OSTI)

    Santarius, J. F.; Mogahed, E. A.; Emmert, G. A.; Khater, H. Y.; Nguyen, C. N.; Ryzhkov, S. V.; Stubna, M. D.

    2000-03-31

    A team from the Universities of Wisconsin, Washington, and Illinois performed an engineering scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis for deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core. For the engineering conceptual design of the fusion core, the project team focused on intermediate-term technology. For example, one decision was to use steele structure. The FRC systems analysis led to a fusion power plant with attractive features including modest size, cylindrical symmetry, good thermal efficiency (52%), relatively easy maintenance, and a high ratio of electric power to fusion core mass, indicating that it would have favorable economics.

  19. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  20. EIS-0385-S1: Notice of Additional Public Scoping Meeting | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meeting EIS-0385-S1: Notice of Additional Public Scoping Meeting Site Selection for the Expansion of the Strategic Petroleum Reserve On March 5, 2008, the...

  1. Microsoft Word - OE ORNL Materials Innovation for Grid Workshop Scoping Document FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MATERIALS INNOVATION FOR NEXT GENERATION T&D GRID COMPONENTS October 2015 Energetics Incorporated SCOPING DOCUMENT Materials Innovation for Next Generation T&D Grid Components: Scoping Document October 2015 i CONTENTS 1. Introduction ............................................................................................................................................................... 1 Purpose

  2. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  3. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  4. Defining Genome Project Standards in a New Era of Sequencing (GSC8 Meeting)

    ScienceCinema (OSTI)

    Chain, Patrick [DOE JGI

    2011-04-28

    The Genomic Standards Consortium was formed in September 2005. It is an international, open-membership working body which promotes standardization in the description of genomes and the exchange and integration of genomic data. The 2009 meeting was an activity of a five-year funding "Research Coordination Network" from the National Science Foundation and was organized held at the DOE Joint Genome Institute with organizational support provided by the JGI and by the University of California - San Diego.

  5. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT INCREASED LIQUID LEVEL ANALYSIS FOR 241-AP TANK FARMS

    SciTech Connect (OSTI)

    MACKEY TC; DEIBLER JE; JOHNSON KI; PILLI SP; KARRI NK; RINKER MW; ABATT FG; CARPENTER BG

    2007-02-16

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the SDT System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

  6. External Independent Review (EIR) Scoping Meeting Agreement Form...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Acquisition and Project Management (OAPM) must perform a Performance ... expectations for both the CD-2 and CD-3 EIR, and thereby facilitate the project planning process. ...

  7. Defining the functional determinants for RNA surveillance by...

    Office of Scientific and Technical Information (OSTI)

    Defining the functional determinants for RNA surveillance by RIG-I Citation Details ... Research Org: Advanced Photon Source (APS), Argonne National Laboratory (ANL), Argonne, IL ...

  8. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork You are ...

  9. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Germicidal ...

  10. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Ultraviolet; UV; ...

  11. Structures of Cyanobactin Maturation Enzymes Define a Family...

    Office of Scientific and Technical Information (OSTI)

    Structures of Cyanobactin Maturation Enzymes Define a Family of Transamidating Proteases Citation Details In-Document Search Title: Structures of Cyanobactin Maturation Enzymes ...

  12. Improving the Quality and Scope of EIA Data

    Reports and Publications (EIA)

    2011-01-01

    Section 805(a) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-1401 requires the U.S. Energy Information Administration (EIA) to establish a five-year plan to enhance the quality and scope of its data collection necessary to ensure that the scope, accuracy, and timeliness of the information needed for efficient functioning of energy markets and related financial operations. This report is in response to section 805(b) of EISA which calls on EIA to submit to Congress the plan established under subsection (a), including a description of any improvements needed to enhance the ability of the Administrator to collect and process energy information in a manner consistent with the needs of energy markets.

  13. Earthquake warning system for infrastructures : a scoping analysis.

    SciTech Connect (OSTI)

    Brodsky, Nancy S.; O'Connor, Sharon L.; Stamber, Kevin Louis; Kelic, Andjelka; Fogleman, William E.; Vugrin, Eric D.; Corbet, Thomas Frank, Jr.; Brown, Theresa Jean

    2011-09-01

    This report provides the results of a scoping study evaluating the potential risk reduction value of a hypothetical, earthquake early-warning system. The study was based on an analysis of the actions that could be taken to reduce risks to population and infrastructures, how much time would be required to take each action and the potential consequences of false alarms given the nature of the action. The results of the scoping analysis indicate that risks could be reduced through improving existing event notification systems and individual responses to the notification; and production and utilization of more detailed risk maps for local planning. Detailed maps and training programs, based on existing knowledge of geologic conditions and processes, would reduce uncertainty in the consequence portion of the risk analysis. Uncertainties in the timing, magnitude and location of earthquakes and the potential impacts of false alarms will present major challenges to the value of an early-warning system.

  14. YUCCA MOUNTAIN PROJECT - A BRIEFING --

    SciTech Connect (OSTI)

    NA

    2003-08-05

    This report has the following articles: Nuclear waste--a long-term national problem; Spent nuclear fuel; High-level radioactive waste; Radioactivity and the environment; Current storage methods; Disposal options; U.S. policy on nuclear waste; The focus on Yucca Mountain; The purpose and scope of the Yucca Mountain Project; The approach for permanently disposing of waste; The scientific studies at Yucca Mountain; The proposed design for a repository at Yucca Mountain; Natural and engineered barriers would work together to isolate waste; Meticulous science and technology to protect people and the environment; Licensing a repository; Transporting waste to a permanent repository; The Environmental Impact Statement for a repository; Current status of the Yucca Mountain Project; and Further information available on the Internet.

  15. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  16. Further Developments on the Geothermal System Scoping Model: Preprint

    SciTech Connect (OSTI)

    Antkowiak, M.; Sargent, R.; Geiger, J. W.

    2010-07-01

    This paper discusses further developments and refinements for the uses of the Geothermal System Scoping Model in an effort to provide a means for performing a variety of trade-off analyses of surface and subsurface parameters, sensitivity analyses, and other systems engineering studies in order to better inform R&D direction and investment for the development of geothermal power into a major contributor to the U.S. energy supply.

  17. FEDERAL LOAN GUARANTEE SOLICITATION & SUPPLEMENTS FOR: ADVANCED NUCLEAR ENERGY PROJECTS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ADVANCED NUCLEAR ENERGY PROJECTS U.S. Department of Energy Loan Programs Office Solicitation Number: DE-SOL-0007791 INCLUDED DOCUMENTS (UPDATED: January 19, 2016) Document Issue Date Subject Solicitation Section Affected SOLICITATION December 10, 2014 Solicitation for Advanced Nuclear Energy Projects SUPPLEMENT I June 23, 2015 Scope of Projects Eligible II.C. inserted after II.B (p. 3) SUPPLEMENT II November 6, 2015 Early Upstream and Engineering Project Costs II.D inserted after II.C (p. 3)

  18. Project Benefits

    Broader source: Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  19. Hydropower Projects

    Broader source: Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  20. Fast Flux Test Facility transition project resource loaded schedule. Revision 1

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1994-10-31

    Revision 1 of the Fast Flux Test Facility (FFTF) Transition Project Resource Loaded Schedule (RLS) provides detail to manage the major elements, project baseline and cost estimate for the FFF Transition Project within the Advanced Reactors Transition Program, comprised of Activity Data Sheets (ADS) 6640, 6641, and 6642. The scope includes all work in the Budget and Reporting categories of Program Integration (PI), Surveillance and Maintenance (S and M), and Deactivation/Compliance (D/C). The transition activities are necessary to bring the FFTF and related facilities to a safe deactivation state, while maintaining worker health and safety. The scope of ADS 6640 and 6642 is the FFTF Transition Project while the scope of ADS 6641 is the Hanford Site Nuclear Energy Legacies.

  1. Community Wind Handbook/Research Project Economics & Financing...

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Research Project Economics & Financing Generally defined as the amount of time it...

  2. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    SciTech Connect (OSTI)

    Pratt, Joseph William; Harris, Aaron P

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  3. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  4. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Sandia National Laboratories study examines the feasibility of a hydrogen-fueled PEM fuel cell barge to provide electrical power to vessels at anchorage or at berth.

  5. UMTRA Project document control system manual

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This manual defines the Project Document Control System (PDCS) operated by the US DOE Uranium Mill tailings Remedial Action (UMTRA) project Office. The purpose of the PDCS is to provide an active and continuing program for acquiring, controlling, retaining, retrieving, retiring and disposing of all UMTRA Project documents. The PDCS also provides guidance and coordination in transferring documents by various UMTRA Projection document control centers to a central location.

  6. Post Secondary Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post Secondary Project Performance Benchmarks (All ASHRAE Zones) continued > We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach

  7. Public Housing Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Housing Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach documented in Hopper et

  8. RP-5 Renewable Energy Efficiency Project

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2004-01-29

    This is the sixth quarterly technical report for the RP-5 Renewable Energy Efficiency Project. The report summarizes the work progress, effort and activities that took place during the period from October 1, 2003 through December 31, 2003. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. In coordination with the DOE, IEUA has revised the original Cooperative Agreement to reflect the actual and current project scope of work. The original Agreement statement of work (SOW) included conceptual and preliminary equipment and systems, which were further evaluated for feasibility and suitability for the project. As a result, some of the equipment was taken out of the project scope. In response to questions from the DOE, IEUA has submitted a summary report on the Organic Rankine Cycle (ORC) secondary power generation units for availability and suitability for this project and associated safety concerns pointed out by the DOE. IEUA has awarded the consulting engineering contract to Parsons Water and Infrastructure, Inc. to provide the project's design and construction services. The project's pre-design kickoff meeting was held at IEUA's headquarters on December 11, 2003. IEUA has submitted a proposal for a grant offered by California Energy Commission (CEC) which if awarded to IEUA, will add value to this project. IEUA has finalized and signed the agreement with Stirling Energy Systems (SES) to host a 25 kW Stirling Engine at the RP-5 plant site for reliability and performance testing using digester and natural gas. As a result of further evaluation of the flexible microturbine system, IEUA has decided to take it out of the project's scope of work; however, it may be considered in future projects at other locations. IEUA has installed a 60 kW Photovoltaic (PV) power generation system on the roof of the new headquarters building. A matching funds update is also included in the Results and Discussion section. The update presents the

  9. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  10. Final project report

    SciTech Connect (OSTI)

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].