Sample records for defined project scope

  1. Program Evaluation: Define Review Purpose and Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Define Review Purpose and Scope Program Evaluation: Define Review Purpose and Scope The first step in preparation for a particular peer review is to determine the specific purpose and scope of the review within the context of other review and management activities. Improving program management and demonstrating public accountability, providing an honest independent technical review of the projects and program, and communicating the value of the programs to the larger public are all potentially

  2. Software Defined Networking (SDN) Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software Defined Networking (SDN) Project Energy sector-focused SDN flow controller to manage control system networks centrally and securely Background Traditional information technology (IT) approaches to network administration and packet delivery are not always appropriate for electric industry applications. The nondeterministic latency and configuration complexity make network design difficult for the deterministic, static control systems of the energy sector. In the electric industry, it is

  3. IDC Reengineering Phase 2 Project Scope.

    SciTech Connect (OSTI)

    Harris, James M.

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta

  4. Software Defined Networking (SDN) Project

    Energy Savers [EERE]

    with the SEL-2740S substation hardened switch, developed through the Watchdog Project. ... is developing a flow controller to be used with the SEL- 2740S substation hardened switch. ...

  5. PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope and

    Office of Environmental Management (EM)

    Plan Project Scope and Objectives Examples Example 6 2.3 MISSION OBJECTIVES Stabilization of plutonium-bearing materials and deactivation/dismantlement of the PFP Complex will result in the virtual elimination of the hazards and risks associated with the facility and will greatly reduce the costs of safe, secure S&M. Using the lessons learned from deactivation projects across the DOE Complex, further improvement on previously applied deactivation methods is anticipated. The major mission

  6. Secure Software-Defined Radio Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Software-Defined Radio Project Secure, versatile radio for "last mile" communications to utility distribution automation devices Background Communication to and from utility distribution automation devices provides greater system reliability and uptime, faster restoration, and more cost effective operations. However, many of these utility devices are located in remote locations, making secure communications difficult. Wired communication such as fiber optic cabling can be prohibitively

  7. PROJECT PROFILE: Defining the Defect Chemistry and Structural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties Required for ...

  8. PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Required for 24%-Efficient CdTe Devices | Department of Energy Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices PROJECT PROFILE: Defining the Defect Chemistry and Structural Properties Required for 24%-Efficient CdTe Devices Funding Opportunity: SuNLaMP SunShot Subprogram: Photovoltaics Location: National Renewable Energy Laboratory, Golden, CO Amount Awarded: $6,900,000 While crystalline silicon accounted for two thirds of the photovoltaic (PV)

  9. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    SciTech Connect (OSTI)

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  10. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-0501 Unlimited Release Printed February 2013 Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Joseph W. Pratt and Aaron P. Harris Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security

  11. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    SciTech Connect (OSTI)

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  12. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  13. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  14. Scoping Study for Demand Respose DFT II Project in Morgantown, WV

    SciTech Connect (OSTI)

    Lu, Shuai; Kintner-Meyer, Michael CW

    2008-06-06

    This scoping study describes the underlying data resources and an analysis tool for a demand response assessment specifically tailored toward the needs of the Modern Grid Initiatives Demonstration Field Test in Phase II in Morgantown, WV. To develop demand response strategies as part of more general distribution automation, automated islanding and feeder reconfiguration schemes, an assessment of the demand response resource potential is required. This report provides the data for the resource assessment for residential customers and describes a tool that allows the analyst to estimate demand response in kW for each hour of the day, by end-use, season, day type (weekday versus weekend) with specific saturation rates of residential appliances valid for the Morgantown, WV area.

  15. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  16. High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

    SciTech Connect (OSTI)

    Larry Demick

    2010-08-01

    The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

  17. Scoping and Framing Social Opposition to U.S. Wind Projects (Poster)

    SciTech Connect (OSTI)

    Lantz, E.; Flowers, L.

    2010-05-01

    Historical barriers to wind power include cost and reliability. However, rapid growth has increased the footprint of wind power in the United States, and some parts of the country have begun to observe conflicts between local communities and wind energy development. Thus, while questions of economic viability and the ability of grid operators to effectively manage wind energy have become less significant, community acceptance issues have emerged as a barrier to wind and associated transmission projects. Increasing community acceptance is likely to be a growing challenge as the wind industry seeks electricity sector penetration levels approaching 20%.

  18. EIS-0489: Notice of Additional Public Scoping Meetings | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meetings EIS-0489: Notice of Additional Public Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project ...

  19. LED Surgical Task Lighting Scoping Study: A Hospital Energy Alliance Project

    SciTech Connect (OSTI)

    Tuenge, Jason R.

    2011-01-17

    Tungsten-halogen (halogen) lamps have traditionally been used to light surgical tasks in hospitals, even though they are in many respects ill-suited to the application due to the large percentage of radiant energy outside the visible spectrum and issues with color rendering/quality. Light-emitting diode (LED) technology offers potential for adjustable color and improved color rendition/quality, while simultaneously reducing side-effects from non-visible radiant energy. It also has the potential for significant energy savings, although this is a fairly narrow application in the larger commercial building energy use sector. Based on analysis of available products and Hospital Energy Alliance member interest, it is recommended that a product specification and field measurement procedure be developed for implementation in demonstration projects.

  20. Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work

    SciTech Connect (OSTI)

    D. E. Shanklin

    2007-07-25

    This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

  1. Advanced system demonstration for utilization of biomass as an energy source. Volume I. Scope and design criteria and project summary

    SciTech Connect (OSTI)

    1980-10-01

    The information in this document is the result of an intensive engineering effort to demonstrate the feasibility of biomass-fueled boilers in cogeneration applications. This design package is based upon a specific site in the State of Maine. However, the design is generic in nature and could serve as a model for other biomass conversion facilities located anywhere biomass is abundant. The project's purpose and summary information are presented: the plant, its concept of operation; and other overall information are described. The capital cost estimate for the plant, and the basis upon which it was obtained are given; a schedule of key milestones and activities required to construct the plant and put it into operation is presented; and the general findings in areas that affect the viability of the project are discussed. The technical design, biomass study, environmental impact, commercialization, and economic factors are addressed. Each major plant area and the equipment and facilities that each includes are discussed in depth. Some overall plant requirements, including noise control, reliability, maintainability, and safety, are detailed. The results of each study relating to alternatives considered for optimizing plant operation parameters and specific system process schemes are briefly presented. All economic factors that affect the feasibility and viability of the biomass project are defined and evaluated.

  2. Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan

    SciTech Connect (OSTI)

    Parazin, R.J.

    1998-08-28

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

  3. EIS-0458: Scoping Meeting Transcript

    Broader source: Energy.gov [DOE]

    Transcript of the public scoping meeting on the draft EIS for the proposed loan guarantee for the First Solar Topaz Solar Farm Project in San Luis Obispo County, CA.

  4. Paducah Cleanup Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope Paducah Cleanup Scope This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. This graphic illustrates the organization of the Media/Activity-Specific OUs and Primary Projects. Check marks indicate completed projects and gradient boxes indicate projects in progress. The overall environmental cleanup strategy at Paducah is based on taking near-term actions to

  5. Commercial production and distribution of fresh fruits and vegetables: A scoping study on the importance of produce pathways to dose. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Marsh, T.L.; Anderson, D.M.; Farris, W.T.; Ikenberry, T.A.; Napier, B.A.; Wilfert, G.L.

    1992-09-01

    This letter report summarizes a scoping study that examined the potential importance of fresh fruit and vegetable pathways to dose. A simple production index was constructed with data collected from the Washington State Department of Agriculture (WSDA), the United States Bureau of the Census, and the United States Department of Agriculture (USDA). Hanford Environmental Dose Reconstruction (HEDR) Project staff from Battelle, Pacific Northwest Laboratories, in cooperation with members of the Technical Steering Panel (TSP), selected lettuce and spinach as the produce pathways most likely to impact dose. County agricultural reports published in 1956 provided historical descriptions of the predominant distribution patterns of fresh lettuce and spinach from production regions to local population centers. Pathway rankings and screening dose estimates were calculated for specific populations living in selected locations within the HEDR study area.

  6. I. Definition and Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Smart Grid RFI Page 2 November 1, 2010 I. Definition and Scope I.1. We invite comment however on whether this [Title XIII] is the best way to define the smart grid. What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? If the definition is overly broad, what policy risks emerge as a result? * While Title XIII starts framing the necessary committee's and organizations needed to start outlining the Smart Grid discussion, it is lacking in the

  7. Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. ... expected to fund the project from GPP. SSO suggested that inclusion with HSM was required. ...

  8. EIS-0504: Notice of Extension of Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Scoping Period EIS-0504: Notice of Extension of Scoping Period Gulf LNG Liquefaction Project, Jackson County, Mississippi FERC extended the scoping period to September 15, 2014. For more information on this project, see the project page: http://energy.gov/node/948516. Download Document EIS-0504: Notice of Intent to Prepare Environmental Impact Statement (8.41 KB) More Documents & Publications EIS-0512: Notice of Public Scoping Meetings EIS-0512: Notice of Public Scoping Meetings

  9. DOE Issues Request for Information for Scope Requirements Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information for Scope Requirements Planning at Los Alamos National Laboratory DOE Issues ... Completion Project Bridge Contract," reference number DE-SOL-0007781, for which a ...

  10. EA-1903: Notice of Scoping of an Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Scoping of an Environmental Assessment Kansas State University (KSU) Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office is requesting public ...

  11. EIR SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR _...

    Office of Environmental Management (EM)

    SCOPING MEETING AGREEMENT FORM EIR SCOPING MEETING FOR ... Date of Scoping Meeting: Date of Planned On-Site EIR: Name OrganizationPosition PhoneEmail ...

  12. U.S. Department of Energy Project Definition Rating Index Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-07-22

    This Guide assists individuals and teams involved in conducting assessments of project definition (i.e., how well front-end planning has been conducted to define project scope) using a numerical project management tool developed by the Construction Industry Institute (CII), tailored for DOE use. Called the Project Definition Rating Index (PDRI), the PDRI is a simple but powerful tool that facilitates the measurement of the degree of scope definition for completeness for traditional construction projects, both nuclear and non-nuclear. No cancellations.

  13. EIS-0407: Amended Notice of Intent to Modify the Scope of the...

    Broader source: Energy.gov (indexed) [DOE]

    Refinery Project near Hugoton, Kansas Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement for the Abengoa Refinery Project near Hugoton, Kanasas,...

  14. Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-08

    The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

  15. Scoping Period Closed

    Broader source: Energy.gov [DOE]

    The environmental impact statement (EIS) scoping period has ended. DOE is preparing a Draft EIS that will analyze and compare the potential environmental impacts of various alternative approaches...

  16. Scoping Materials | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Scoping Materials Scoping Meeting Notice Scoping Meeting Transcript Public Scoping Presentation Written Comment Form NEPA Fact Sheet Tritium Fact Sheet Tritium Production and Environmental Impacts TVA Fact Sheet

  17. External Independent Review (EIR) Scoping Meeting Agreement Form |

    Energy Savers [EERE]

    Department of Energy Scoping Meeting Agreement Form External Independent Review (EIR) Scoping Meeting Agreement Form Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating Procedures

  18. Scoping Period Open

    Broader source: Energy.gov [DOE]

    DOE has published in the Federal Register a Notice of Intent to prepare an environmental impact statement (EIS), and the scoping period is open for public comment for at least 30 days. DOE requests...

  19. Video Shoot Scope of Work

    Broader source: Energy.gov [DOE]

    Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  20. Richland Operations Office Cleanup Strategy, Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office Cleanup Strategy, Scope Matt McCormick Manager Richland Operations Office May 1, 2014 John Ciucci Chief Operating Officer CH2M HILL Plateau Remediation Company Scott Sax President and Project Manager Washington Closure Hanford Frank Armijo President and General Manager Mission Support Alliance www.energy.gov/EM 2 Richland Operations Office Hanford Site History Hanford * Hanford began in 1943 as part of the Manhattan Project * Production of plutonium increased during

  1. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  2. Project Submission Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cooperation Project Title: CountryOrganizations: Foreign: Foreign POC: U.S: U.S. POC: Technology Area: Scope of Collaborative Research and Development: Justification of Approach: ...

  3. EIS-0463: Reopening of Scoping Period for the Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    ends on June 14, 2011. For more information see the project page at: http:energy.govnode300109. Download Document EIS-0463: Reopening of Scoping Period for the Environmental...

  4. Amended Notice of Intent To Modify the Scope of the EIS and Conduct...

    Energy Savers [EERE]

    the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173...

  5. 2014 Manufacturing Energy and Carbon Footprints: Scope

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scope The energy and carbon footprint analysis examines fifteen individual manufacturing sectors that together consume 95% of U.S. manufacturing primary energy consumption and account for 94% of U.S. manufacturing combustion greenhouse gas (GHG) emissions. Manufacturing sectors are defined by their respective NAICS (North American Industry Classification System) codes. i Individual sectors were selected for analysis based on their relative energy intensities, contribution to the U.S. economy,

  6. Secure Software-Defined Radio Project

    Broader source: Energy.gov (indexed) [DOE]

    event and access logging, encryption, disabling of unused ports, and intelligent password and network key management. * Many radios have data throughput below 1 megabit per ...

  7. Shifter: User Defined Images

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Shifter: User Defined Images Shifter: User Defined Images Shifter: Bringing Linux containers to HPC NERSC is working to increase flexibility and usability of its HPC systems by enabling Docker-like Linux container technology. Linux containers allow an application to be packaged with its entire software stack - including some portions of the base OS files - as well defining needed user environment variables and application "entry point.". Containers may provide an abstract way of

  8. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  9. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and ...

  10. Ventilation technologies scoping study

    SciTech Connect (OSTI)

    Walker, Iain S.; Sherman, Max H.

    2003-09-30

    This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the needs of California, determining residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and level of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  11. March 2016 Project Dashboard | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Office of Project Management Oversight and Assessments ... The current portfolio consists of 33 active projects with established scope, schedule, and cost performance baselines. ...

  12. EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement Abengoa Refinery Project near Hugoton, Kansas Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement for the Abengoa Refinery Project near Hugoton, Kanasas, DOE/EIS-0407 (April 2009) 74 FR 19543 (2.34 MB) More Documents & Publications EIS-0407:

  13. Amended Notice of Intent To Modify the Scope of the EIS and Conduct

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 | Department of Energy Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 Amended Notice of Intent To Modify the

  14. EA-2004: Public Scoping Notice | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2004: Public Scoping Notice EA-2004: Public Scoping Notice The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct a 1.7-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental Assessment (EA) will

  15. Project Title: Rheocaster Project (4544) Program or Program Office...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Description: The work scope of this project consists of fumishing labor. supervision. materials. tools, equipment, and services as specified on drawings and in this...

  16. EIS-0283-S2: Amended Notice of Intent to Modify the Scope of...

    Broader source: Energy.gov (indexed) [DOE]

    For more information on this project, see the project webpage: http:energy.govnode299815. Download Document EIS-0283-S2: Amended Notice of Intent to Modify the Scope of...

  17. Hanford Advisory Board Budgets and Contracts Committee Meeting 2011 Hanford Lifecycle Scope, Schedule and Cost Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2013 Lifecycle Scope, Schedule and Cost Report Stephen Korenkiewicz, Project Manager US Department of Energy - Richland Operations Office June 6, 2013 1 2 Tri-Party Project Managers The U.S. Department of Energy (DOE), Richland Operations Office (RL) Project Integration and Control (PIC) organization is responsible for Tri-Party Agreement (TPA) Milestone M-036-01C, 2013 Hanford Lifecycle Scope, Schedule and Cost Report (Lifecycle Report) * Stephen Korenkiewicz is the RL Project Manager * David

  18. Scoping Comment Summary 092412.docx

    National Nuclear Security Administration (NNSA)

    Scoping Comment Summary for the Surplus Plutonium Disposition Supplemental Environmental Impact Statement U.S. Department of Energy, National Nuclear Security Administration, and Tennessee Valley Authority Since announcement of the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD Supplemental EIS), DOE has provided three opportunities for the public to provide scoping comments (2007 [72 FR 14543]; 2010 [75 FR 41850]; and 2012 [77 FR 1920]). The public scoping

  19. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  20. CMRR-NF Supplemental EIS Scoping Comments | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) CMRR-NF Supplemental EIS Scoping Comments CMRR-NF Supplemental EIS Scoping Comments Additional CMRR Scoping Comments - 47A Additional CMRR Scoping Comments - 48A Additional CMRR Scoping Comments - 62 Additional CMRR Scoping Comments - 63 Additional CMRR Scoping Comments - 64 Additional CMRR Scoping Comments - 66A Additional CMRR Scoping Comments - 66B Additional CMRR Scoping Comments - 66C Additional CMRR Scoping Comments - 76 Additional CMRR Scoping Comments - 77

  1. EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site-Wide Environmental Impact Statement | Department of Energy Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee The National Nuclear Security Administration (NNSA), an agency within the U.S. Department of Energy (DOE), is extending the scoping period for the

  2. REBUILD AMERICA PROGRAM SCOPE OF WORK

    SciTech Connect (OSTI)

    Jeffrey Brown; Bruce Exstrum

    2004-12-01

    This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

  3. Heating System Modernization, Management of Peripheral Scope...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Modernization, Management of Peripheral Scope Lessons Learned Report, NNSA, Dec 2010 Heating System Modernization, Management of Peripheral Scope Lessons Learned Report,...

  4. Commercial Building Energy Alliance Exterior Lighting Scoping...

    Office of Scientific and Technical Information (OSTI)

    Commercial Building Energy Alliance Exterior Lighting Scoping Study Citation Details ... This report is a scoping study about challenges and energy saving potential regarding ...

  5. Building Energy Data Exchange Specification Scoping Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Exchange Specification Scoping Report Building Energy Data Exchange Specification Scoping Report The Building Energy Data Exchange Specification (BEDES), developed by DOE, is ...

  6. TAPERED DEFINING SLOT

    DOE Patents [OSTI]

    Pressey, F.W.

    1959-09-01

    An improvement is reported in the shape and formation of the slot or opening in the collimating slot member which forms part of an ion source of the type wherein a vapor of the material to be ionized is bombarded by electrons in a magnetic field to strike an arc-producing ionization. The defining slot is formed so as to have a substantial taper away from the cathode, causing the electron bombardment from the cathode to be dispersed over a greater area reducing its temperature and at the same time bringing the principal concentration of heat from the electron bombardment nearer the anode side of the slot, thus reducing deterioration and prolonging the life of the slot member during operation.

  7. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect (OSTI)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  8. EIS-0512: Notice of Public Scoping Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska LNG Project, Alaska Summary The Federal Energy Regulatory Commission (FERC) announced scoping meetings it will conduct for an EIS that will analyze the potential environmental impacts of a proposal to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope. The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export (marine)

  9. West Valley Demonstration Project Administrative Consent Order...

    Office of Environmental Management (EM)

    West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 State New York Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Establish ...

  10. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  11. Interviewee Travel Regulations Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and

  12. Residential ventilation standards scoping study

    SciTech Connect (OSTI)

    McKone, Thomas E.; Sherman, Max H.

    2003-10-01

    The goals of this scoping study are to identify research needed to develop improved ventilation standards for California's Title 24 Building Energy Efficiency Standards. The 2008 Title 24 Standards are the primary target for the outcome of this research, but this scoping study is not limited to that timeframe. We prepared this scoping study to provide the California Energy Commission with broad and flexible options for developing a research plan to advance the standards. This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the ventilation needs of California residences, determining the bases for setting residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and corresponding levels of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  13. Lake Charles CCS Project

    SciTech Connect (OSTI)

    Leib, Thomas; Cole, Dan

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  14. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility ...

  15. Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-07

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  16. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183- Jun. 15, 2011

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  17. Introduction to HelioScope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HelioScope Paul Grana Presented at the 2013 Sandia PV Performance Modeling Workshop Santa Clara, CA, May 1-2, 2013 Published by Sandia National Laboratories with the Permission of the Author HelioScope 101 Similar to Typical Performance Models:  Use standard weather inputs (TMY3, etc.)  Hourly 8760 production analysis  Return system AC energy (inverter AC out) Different from Typical Performance Models:  Component-Driven  Design-Integrated  Cloud-Based Structure of the Model

  18. Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Participants in Scoping (CEQ, 1981) Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping (CEQ, 1981) This Council on Environmental ...

  19. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Pseudo-Single-Bunch Expands Experimental Scope Print Wednesday, 25 September 2013 00:00 Initial tests of a new pseudo-single-bunch...

  20. Sandia defines solar variability zones

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    defines solar variability zones - Sandia Energy Energy Search Icon Sandia Home Locations ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  1. Buildings of the Future Scoping Study: A Framework for Vision Development

    SciTech Connect (OSTI)

    Wang, Na; Goins, John D.

    2015-02-01

    The Buildings of the Future Scoping Study, funded by the U.S. Department of Energy (DOE) Building Technologies Office, seeks to develop a vision for what U.S. mainstream commercial and residential buildings could become in 100 years. This effort is not intended to predict the future or develop a specific building design solution. Rather, it will explore future building attributes and offer possible pathways of future development. Whether we achieve a more sustainable built environment depends not just on technologies themselves, but on how effectively we envision the future and integrate these technologies in a balanced way that generates economic, social, and environmental value. A clear, compelling vision of future buildings will attract the right strategies, inspire innovation, and motivate action. This project will create a cross-disciplinary forum of thought leaders to share their views. The collective views will be integrated into a future building vision and published in September 2015. This report presents a research framework for the vision development effort based on a literature survey and gap analysis. This document has four objectives. First, it defines the project scope. Next, it identifies gaps in the existing visions and goals for buildings and discusses the possible reasons why some visions did not work out as hoped. Third, it proposes a framework to address those gaps in the vision development. Finally, it presents a plan for a series of panel discussions and interviews to explore a vision that mitigates problems with past building paradigms while addressing key areas that will affect buildings going forward.

  2. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  3. January 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  4. December 2015 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOEs portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 32 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  5. April 2016 Project Dashboard

    Broader source: Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) provides a monthly assessment of DOE’s portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The current portfolio consists of 34 active projects with established scope, schedule, and cost performance baselines. Based on current performance, projects that are expected to meet their performance baseline are assessed as GREEN, projects that are at-risk of breaching their performance baselines are assessed as YELLOW, and projects that are expected to breach their performance baselines are assessed as RED.

  6. EIS-0512: Notice of Public Scoping Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Federal Energy Regulatory Commission (FERC) announced scoping meetings it will conduct for an EIS that will analyze the potential environmental impacts of a proposal to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope. The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export (marine) terminal, and associated

  7. 2012 CERTS LAAR Program Peer Review - Scoping Study on Industrial Regulation - Nasr Alkadi, ORNL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nasr Alkadi, Ph.D. Michael Starke, PhD Oak Ridge National Laboratory CERTS Internal Program Review FY12 DOE-CERTS Transmission Reliability R&D at Lawrence Berkeley National Laboratory. Scoping Study on Industrial Regulation September 20, 2012 2 Managed by UT-Battelle for the U.S. Department of Energy Project objective: Scoping of Regulation Reserves in Industrial Sector 2 Alcoa's Smelting Process is a significant regulation asset at Warrick, IN. * Alcoa has demonstrated Regulation Band in

  8. Mk12A/W78 ground test project (u)

    SciTech Connect (OSTI)

    Stokes, Kyle R

    2010-12-01

    The slides present the scope, objectives and status of the Mk12A1W78 Ground Test Project for the purpose of updating the ICBM Project Officers Group. In addition, project constraints and risks are discussed.

  9. Software-Defined Networking (SDN)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENOS Experimental Network Testbeds Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Science Engagement Move your data Programs & Workshops Science Requirements Reviews Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Network R&D » Software-Defined Networking (SDN) Network R&D Software-Defined Networking (SDN) ENOS Experimental

  10. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    SciTech Connect (OSTI)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  11. Draft - DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  12. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  13. Scoping Meeting Summary, Waimea, Hawai'i, March 16, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-10

    The meeting began with presentations by the facilitator and the representative from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process. A number of process issues were covered, including the current State dependence on imported petroleum (>90%), the public nature of the DOE EIS process, DOE's responsibility to consider general impacts to the global situation, and database availability. Dr. Lewis assured those present that the EIS would examine transmission system/cable-related impacts and alternatives to the proposed action, within geothermal and outside it (including coal), including different mixes of supply- or demand-side options on each island using an integrated resource planning approach. With respect to prior and on-going geothermal developments in Puna, Dr. Lewis explained that although DOE will not conduct new environmental reviews of the HGP(A) and other federal geothermal development in Puna, these and the present developments will be considered (including medical records) from the perspective of cumulative impacts.

  14. EIS-0501: FERC Project Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FERC Project Update EIS-0501: FERC Project Update Golden Pass LNG Export and Pipeline Project, Texas and Louisiana After conducting scoping for an EA for the proposed Golden Pass LNG terminal and pipeline project, FERC issued a project update that announced that, due to changes in the project location and scope, it would prepare an EIS instead. DOE, Office of Fossil Energy - a cooperating agency in preparing the EIS - has an obligation under Section 3 of the Natural Gas Act to authorize the

  15. Final EIS for Champlain Hudson Power Express Transmission Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project CEQ Releases Two Handbooks on Improving Efficiency of Federal ...

  16. Pantex High Pressure Fire Loop Project Completed On Time, Under...

    National Nuclear Security Administration (NNSA)

    Using underruns generated from these savings, the Integrated Project Team added scope through the Baseline Change Proposal process. Two 400,000-gallon fire protection water supply ...

  17. Scoping Materials | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room SEIS for the Production of Tritium in a Commercial Light Water Reactor Scoping...

  18. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section...

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities...

  19. Determining the appropriate scope: Assessing at the ecosystem level

    SciTech Connect (OSTI)

    Southerland, M.T.

    1995-12-01

    Traditional approaches to determining the scope of environmental impact assessment have been based on an ad hoc selection of issues by the project proponent and other interested parties. Resulting in an inadequate consideration of both cumulative effects and impacts on biodiversity. Although public involvement in scoping the assessment must by resource-oriented, rather than activity-oriented, the appropriate scope of environmental impact assessment is the ecosystem. Drawing from the Council on Environmental Quality (CEQ) guidance on the consideration of biodiversity under the National Environmental Policy Act (NEPA) and the growing consensus on principles of ecosystem management, scoping should begin with the large-scale ecosystem focusing on essential components potentially affected by the project to determine the appropriate bounds for the study. Although the science of analyzing ecosystems has many limitation, progress in improving environmental impact assessment can be made at any of the three increasingly difficult steps in assessing at the ecosystem level: (1) The first step involves bounding the assessment within the regional context to address cumulative effects and biodiversity. The adoption of a landscape scale has proven to be the most effective solution to the problems of setting boundaries for study units in time and space that do not omit important sources, endpoints (indicators), or processes. (2) The second step involves the use of higher-level indicators to characterize biodiversity and ecosystem integrity. Useful measures include community indices of biological integrity and landscape parameters such as habitat composition and fragmentation. (3) The third step involves identifying ecosystem thresholds (i.e., carrying capacities) to analyze the significance of cumulative impacts. Trends analysis can help identify potential threshold effects when process models are not available.

  20. Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping (CEQ, 1981)

    Broader source: Energy.gov [DOE]

    This Council on Environmental Quality scoping guidance document consists of advice on what works and what does not, based on the experience of many agencies and other participants in scoping. It is intended to make generally available the results of the Council's research, and to encourage the use of better techniques for ensuring public participation and efficiency in the scoping process.

  1. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Actual FY 2013 Pre- & Post-CAP* Actual Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90% 83% Construction 84% Cleanup 82% 70% Pre-CAP 84% Post-CAP Based on 3-year rolling period (FY11 to FY13) of 93 projects. TPC is Total Project Cost.

  2. Contract/Project Management

    Office of Environmental Management (EM)

    First Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 84% Construction 83% Cleanup 85% 77% Pre-CAP 86% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  3. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 88% Construction 87% Cleanup 89% 77% Pre-CAP 92% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  4. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 87% Construction 87% Cleanup 87% 77% Pre-CAP 90% Post- CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  5. Contract/Project Management

    Office of Environmental Management (EM)

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Performance Metric FY 2012 Target FY 2012 Final FY 2012 Pre- & Post-CAP Final Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 86% Construction 87% Cleanup 84% 77% Pre-CAP 89% Post-CAP This is based on a 3- year rolling average (FY10 to FY12). TPC is Total Project Cost.

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  7. Template:GeothermalProject | Open Energy Information

    Open Energy Info (EERE)

    navigation, search This is the 'GeothermalProject' template. To define a new Geothermal Development Project, please use the Geothermal Development Project Form. Parameters Place...

  8. EA-1980: Public Scoping Notice | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Public Scoping Notice EA-1980: Public Scoping Notice Spar Canyon-Round Valley Access ... PDF icon EA-1980-PublicScopingLetter-2014.pdf More Documents & Publications 2014 Annual ...

  9. Meeting Summary for HTF PA Scoping | Department of Energy

    Office of Environmental Management (EM)

    for HTF PA Scoping Meeting Summary for HTF PA Scoping Meeting Notes for the Savannah River Site H-Area Tank Farm Performance Assessment Scoping Meeting PDF icon Savannah River Site...

  10. Environmental Restoration Projects

    Office of Environmental Management (EM)

    3.0 5 15.0 A6 Forecast of Cost at Completion P 3.0 NA 0.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 Subtotal Cost 51.0 150.0 B1 Project Schedule H 7.5 ...

  11. Facility Disposition Projects

    Office of Environmental Management (EM)

    A6 Forecast of Cost at Completion P 3.0 NA 0.0 3 9.0 5 15.0 A7 Cost Estimate for Next Phase Work Scope P 3.0 5 15.0 5 15.0 5 15.0 Subtotal Cost 36.0 133.5 150.0 B1 Project ...

  12. Report Now Available: DC Microgrids Scoping Study--Estimate of...

    Office of Environmental Management (EM)

    Report Now Available: DC Microgrids Scoping Study--Estimate of Technical and Economic Benefits (March 2015) Report Now Available: DC Microgrids Scoping Study--Estimate of Technical ...

  13. California's Climate Change Proposed Scoping Plan | Open Energy...

    Open Energy Info (EERE)

    Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan AgencyCompany Organization State of California Resource...

  14. Section 54: Scope of Compliance Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scope of Compliance Assessments (40 CFR § 194.54) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Scope of Compliance Assessments (40 CFR § 194.54) Table of Contents 54.0 Scope of Compliance Assessments (40 CFR § 194.54) 54.1 Requirements 54.2 Background 54.3 1998 Certification Decision 54.4 Changes in the CRA-2004 54.5 EPA's Evaluation of Compliance for the 2004 Recertification 54.6 Changes

  15. Contract/Project Management

    Office of Environmental Management (EM)

    3 Third Quarter Overall Root Cause Analysis (RCA)/Corrective Action Plan (CAP) Performance Metrics 1 Contract/Project Management Performance Metric FY 2013 Target FY 2013 Forecast FY 2013 Pre- & Post-CAP* Forecast Comment Capital Asset Project Success: Complete 90% of capital asset projects at original scope and within 110% of CD-2 TPC. 90%* 83% Construction 85% Cleanup 80% 70% Pre-CAP 84% Post-CAP This is based on a 3- year rolling average (FY11 to FY13). TPC is Total Project Cost.

  16. Defining coiled tubing limits -- A new approach

    SciTech Connect (OSTI)

    Newman, K.R.; Sathuvalli, U.B.; Stone, L.R.; Wolhart, S.

    1996-12-31

    The burst, collapse and axial load operating limits for Coiled Tubing (CT) are currently established using the Von Mises incipient yield criterion. This criterion has historically been used to calculate the limits for oil country tubular goods (OCTG). The limits according to this criterion are based on the point at which the pipe material reaches a load state in which it begins to yield. Because of the bending that occurs when the CT is spooled on and off the reel, and when it is bent over the guide arch, the CT is already far beyond the yield point before it enters a well. Thus, this criterion does not really apply to CT. This paper describes a research project currently in progress. The purpose of this project is to define a new set of CT limits based on criteria other than incipient yield. This new approach to setting CT operating limits takes into account the internal residual stresses in the CT which are a consequence of repeated bending cycles and the accompanying change in material properties.

  17. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly...

  18. Report: Acquisition, Project Management, and Quality Assurance

    Office of Environmental Management (EM)

    ... into a performance baseline with scope, costs, and schedules based on an immature design ... EM's project reporting, analyses, and forecasting. o EM plans to move to a web-based ...

  19. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Pseudo-Single-Bunch Expands Experimental Scope Print Wednesday, 25 September 2013 00:00 Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in

  20. Commercial Building Energy Alliance Exterior Lighting Scoping Study

    SciTech Connect (OSTI)

    Myer, Michael

    2011-10-07

    This report is a scoping study about challenges and energy saving potential regarding exterior lighting.

  1. Microsoft PowerPoint - 1_FG2 scoping_DOE NEPA [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Fossil Energy AGENDA Welcome - Cliff Whyte (DOE-NETL) Background and DOE's Role - Jeff Hoffmann (DOE-NETL) Ameren Project Overview - Mike Long (Ameren) FG Alliance Project Overview - Gordon Beeman (June 7, 8) (FG Alliance) - Ken Humphreys (June 9) (FG Alliance) NEPA Process - Cliff Whyte (DOE-NETL) Public Comments Office of Fossil Energy FutureGen 2.0 Program and the National Environmental Policy Act Public Scoping Meetings - June 7-9, 2011 3 Office of Fossil Energy National

  2. Scoping Study Investigating PWR Instrumentation during a Severe Accident Scenario

    SciTech Connect (OSTI)

    Rempe, J. L.; Knudson, D. L.; Lutz, R. J.

    2015-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) and Fukushima Daiichi Units 1, 2, and 3 nuclear power plants demonstrate the critical importance of accurate, relevant, and timely information on the status of reactor systems during a severe accident. These events also highlight the critical importance of understanding and focusing on the key elements of system status information in an environment where operators may be overwhelmed with superfluous and sometimes conflicting data. While progress in these areas has been made since TMI-2, the events at Fukushima suggests that there may still be a potential need to ensure that critical plant information is available to plant operators. Recognizing the significant technical and economic challenges associated with plant modifications, it is important to focus on instrumentation that can address these information critical needs. As part of a program initiated by the Department of Energy, Office of Nuclear Energy (DOE-NE), a scoping effort was initiated to assess critical information needs identified for severe accident management and mitigation in commercial Light Water Reactors (LWRs), to quantify the environment instruments monitoring this data would have to survive, and to identify gaps where predicted environments exceed instrumentation qualification envelop (QE) limits. Results from the Pressurized Water Reactor (PWR) scoping evaluations are documented in this report. The PWR evaluations were limited in this scoping evaluation to quantifying the environmental conditions for an unmitigated Short-Term Station BlackOut (STSBO) sequence in one unit at the Surry nuclear power station. Results were obtained using the MELCOR models developed for the US Nuclear Regulatory Commission (NRC)-sponsored State of the Art Consequence Assessment (SOARCA) program project. Results from this scoping evaluation indicate that some instrumentation identified to provide critical information would be exposed to conditions that

  3. Project quality assurance plant: Sodium storage facility, project F-031

    SciTech Connect (OSTI)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.

  4. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  5. PGDP Deactivation Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GDP Transition » PGDP Deactivation Project PGDP Deactivation Project PGDP Deactivation Project scope major activities: Site Optimization Studies include: - Steam, Air, Nitrogen and Chilled Water Optimization Study - Water Treatment Facility Optimization Study - C-100 Optimization Study - Sewer Evaluation Study Facility Stabilization Preparation and/or removal of nuclear materials and contaminants from facilities. Stabilization activities are performed during early stages of facility

  6. Scoping study: Substation design workstation

    SciTech Connect (OSTI)

    Mauser, S.F. ); Conroy, M.W. ); Singh, N.M. )

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  7. Warm Water Oxidation Verification - Scoping and Stirred Reactor Tests

    SciTech Connect (OSTI)

    Braley, Jenifer C.; Sinkov, Sergey I.; Delegard, Calvin H.; Schmidt, Andrew J.

    2011-06-15

    Scoping tests to evaluate the effects of agitation and pH adjustment on simulant sludge agglomeration and uranium metal oxidation at {approx}95 C were performed under Test Instructions(a,b) and as per sections 5.1 and 5.2 of this Test Plan prepared by AREVA. (c) The thermal testing occurred during the week of October 4-9, 2010. The results are reported here. For this testing, two uranium-containing simulant sludge types were evaluated: (1) a full uranium-containing K West (KW) container sludge simulant consisting of nine predominant sludge components; (2) a 50:50 uranium-mole basis mixture of uraninite [U(IV)] and metaschoepite [U(VI)]. This scoping study was conducted in support of the Sludge Treatment Project (STP) Phase 2 technology evaluation for the treatment and packaging of K-Basin sludge. The STP is managed by CH2M Hill Plateau Remediation Company (CHPRC) for the U.S. Department of Energy. Warm water ({approx}95 C) oxidation of sludge, followed by immobilization, has been proposed by AREVA and is one of the alternative flowsheets being considered to convert uranium metal to UO{sub 2} and eliminate H{sub 2} generation during final sludge disposition. Preliminary assessments of warm water oxidation have been conducted, and several issues have been identified that can best be evaluated through laboratory testing. The scoping evaluation documented here was specifically focused on the issue of the potential formation of high strength sludge agglomerates at the proposed 95 C process operating temperature. Prior hydrothermal tests conducted at 185 C produced significant physiochemical changes to genuine sludge, including the formation of monolithic concretions/agglomerates that exhibited shear strengths in excess of 100 kPa (Delegard et al. 2007).

  8. Applying value engineering and modern assessment tools in managing NEPA: Improving effectiveness of the NEPA scoping and planning process

    SciTech Connect (OSTI)

    ECCLESTON, C.H.

    1998-09-03

    While the National Environmental Policy Act (NEPA) implementing regulations focus on describing ''What'' must be done, they provide surprisingly little direction on ''how'' such requirements are to be implemented. Specific implementation of these requirements has largely been left to the discretion of individual agencies. More than a quarter of a century after NEPA's enactment, few rigorous tools, techniques, or methodologies have been developed or widely adopted for implementing the regulatory requirements. In preparing an Environmental Impact Statement, agencies are required to conduct a public scoping process to determine the range of actions, alternatives, and impacts that will be investigated. Determining the proper scope of analysis is an element essential in the successful planning and implementation of future agency actions. Lack of rigorous tools and methodologies can lead to project delays, cost escalation, and increased risk that the scoping process may not adequately capture the scope of decisions that eventually might need to be considered. Recently, selected Value Engineering (VE) techniques were successfully used in managing a prescoping effort. A new strategy is advanced for conducting a pre-scoping/scoping effort that combines NEPA with VE. Consisting of five distinct phases, this approach has potentially wide-spread implications in the way NEPA, and scoping in particular, is practiced.

  9. Section 32: Scope of Performance Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Assessments (40 CFR § 194.32) United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Scope of Performance Assessments (40 CFR § 194.32) Table of Contents 32.0 Scope of Performance Assessments (40 CFR § 194.32) 32.1 Requirements 32.2 Background 32.3 1998 Certification Decision 32.3.1 40 CFR § 194.32(a) 32.3.2 40 CFR § 194.32(b) 32.3.3 40 CFR § 194.32(c) 32.3.4 40 CFR § 194.32(d)

  10. Quarry residuals RI/FS scoping document. [Weldon Spring quarry

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The purpose of this document is to serve as a planning tool for the implementation of the Quarry Residual Remedial Investigation/Feasibility Study (RI/FS) process and to provide direct input to revising and updating the 1988 Work Plan for the Weldon Spring Site Remedial Action Project (WSSRAP) Remedial Investigation/Feasibility Study-Environmental Impact Statement for the Weldon Spring Site (RI/FS-EIS) (Peterson et al. 1988) for this effort. The scoping process is intended to outline the tasks necessary to develop and implement activities in compliance with the Comprehensive Environmental Response, Compensation and Liability Act-National Environmental Policy Act (CERCLA-NEPA) process from detailed planning through the appropriate decision document. In addition to scoping the entire process, this document will serve as the primary tool for planning and accomplishing all activities to be developed in the Quarry Residual RI/FS Work Plan. Subsequent tasks are difficult to plan at this time. 10 refs., 5 figs., 5 tabs.

  11. RUS Bulletin 1794-A-603: Scoping Guide | Open Energy Information

    Open Energy Info (EERE)

    3: Scoping Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: RUS Bulletin 1794-A-603: Scoping...

  12. Property:NEPA ScopingInitiatedDate | Open Energy Information

    Open Energy Info (EERE)

    ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  13. EIS-0286: Notice of Revised Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

  14. Advanced Nuclear Energy Projects Solicitation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Solicitation Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION Solicitation and Supplements I, II, and III (January 19, 2016). Applicants should review the final solicitation and all supplements before submitting an application. The full download above contains the following documents listed below: Solicitation (December 10, 2014) Supplement I regarding Scope of Projects Eligible for the Solicitation (June 23, 2015)

  15. FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A)

    National Nuclear Security Administration (NNSA)

    FMT Workforce FTEs by Scope Current Contract Scope of Work (Section J. Appendix A) FTE's* Directed Stockpile Work (DSW) 1,329 Campaigns 260 Readiness in Technical Base & Facilities (RTBF) and Site Stewardship 110 Secure Transportation Asset (STA) 125 Security (Physical and Cyber) 160 Other NNSA/Other DOE 310 includes ICO and Emergency Response Non-DOE (Work for Others) 360 Total FTE's 2,654 *FTEs shown include allocation of indirect FTE's

  16. SNF sludge treatment system preliminary project execution plan

    SciTech Connect (OSTI)

    Flament, T.A.

    1998-03-03

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS.

  17. Social impact assessment - new dimensions in project planning

    SciTech Connect (OSTI)

    Jones, M.G.; Hartog, J.J.; Sykes, R.M.

    1996-11-01

    The Objective of the presentation is to provide understanding of how to improve attention to the social dimensions of EP projects. Social Impacts are the consequences to human populations, communities or individuals resulting from a project or activity. Such impacts may change the way in which people live, relate to one another, organize and cope as members of society. There is an increasing demand and expectation that Exploration and Production activities will both understand their impacts and define benefits for the local communities. Social Impact Assessment can be considered a branch of Environmental Impact Assessment. It has become a tool in its own fight due to the focus that was paid to the natural and physical issues within the EIA process. However there are still strong alignments and the wise project planner will integrate social and environmental issues within their project planning process. This can be done through a combination of studies but can result in a single report. The benefits of SIA will be demonstrated to include: (1) obtaining approvals (2) forward planning and design (3) increased project success-benefits to local community (4) economic benefits (5) decision making by management The types of impacts including demographic, socioeconomic, health, social infrastructure, resources, psychological and community, cultural and social equity will be reviewed. Methods and techniques to identify and assess impacts will be addressed. One of the main challenges in SIA is to reach the right audience. Methods to scope studies and implement consultation will be addressed.

  18. Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach This slideshow explains the scope and goals of the first year of the Quadrennial Energy Review (QER). The first year of the QER focuses on energy transmission, storage, and distribution (TS&D). Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach (14.75 MB) More Documents & Publications QER - Comment of Powder

  19. 2010 Manufacturing Energy and Carbon Footprints: Scope | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Scope 2010 Manufacturing Energy and Carbon Footprints: Scope This five-page document provides detailed descriptions of the manufacturing sectors examined in the Energy and Carbon Footprints (MECS 2010) Scope of the Manufacturing Energy and Carbon Footprints (MECS 2010) (330.09 KB) More Documents & Publications Manufacturing Energy and Carbon Footprints Scope End-Use Sector Flowchart U.S. Manufacturing Energy Use and Greenhouse Gas Emissions Analysis

  20. Building Energy Data Exchange Specification Scoping Report | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Data Exchange Specification Scoping Report Building Energy Data Exchange Specification Scoping Report The Building Energy Data Exchange Specification (BEDES), developed by DOE, is a uniform format is intended to make it easier for external stakeholders to use DOE tools, streamline reporting for DOE programs, and help unlock the full utility of the data that the DOE collects. Download the Building Energy Data Exchange Specification Scoping Report below bedes_scoping_080113.pdf (1.37

  1. Tribal Renewable Energy Webinar: Project Development for Long Term Tribal Energy

    Broader source: Energy.gov [DOE]

    The webinar will cover how to determine project savings and production potential estimates, define project options, refine the project, implement the project, and plan for operations and maintenance.

  2. Fast Flux Test Facility Closure Project - Project Management Plan

    SciTech Connect (OSTI)

    BEACH, R.R.

    2002-09-26

    The Fast Flux Test Facility (FFTF) Closure Project, Project Management Plan, Revision 5, provides the scope, cost, and schedule to achieve the most cost effective and expeditious closure of the FFTF to an assumed final end-state with the reactor vessel and the containment building, below the 5504 grade level, being entombed in place. Closure will be completed by December 2009 at a cost of $547 million.

  3. Define the Game Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Technology Catalyst » Define the Game Plan Define the Game Plan Define the Game Plan A successful High Impact Technologies (HIT) Catalyst program will help stakeholders, including utilities, federal agencies, building owners and operators, nonprofits, and others take advantage of energy and cost savings by implementing available high impact technologies. Based on predefined decision criteria, as laid out in the graphic above, DOE evaluates which market stimulation activities will

  4. ONLY HERE...Will You Define the ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONLY HERE...Will You Define the Future of Energy Application deadline: December 21, 2015 The Mickey Leland Energy Fellowship (MLEF) Program provides college students with an ...

  5. PROJECT MANGEMENT PLAN EXAMPLES Project Execution Example

    Office of Environmental Management (EM)

    Project Execution Example Example 73 6.3 Project Approach The overall schedule strategy for the PFP project includes ongoing minimum safe activities, combined with stabilization of materials followed by materials disposition, and subsequent transition of the PFP complex to a decommissioned state. The PFP material stabilization baseline was developed using a functionally-based work WBS. The WBS defines all activities required to take each material stream from their current location/conditions

  6. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  7. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  8. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  9. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  10. Pseudo-Single-Bunch Expands Experimental Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch

  11. Project W-420 Stack Monitoring system upgrades conceptual design report

    SciTech Connect (OSTI)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  12. Preliminary design requirements document for Project W-378, low-level waste vitrification plant

    SciTech Connect (OSTI)

    Swanson, L.M.

    1995-03-31

    The scope of this preliminary Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to accomplish vitrification and disposal of the pretreated low-level waste (LLW) fraction of the Hanford Site tank waste. This document sets forth function requirements, performance requirements and design constraints necessary to begin conceptual design for the Low-Level Waste Vitrification Plant (LLWVP). System and physical interfaces between the LLWVP Project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. The design requirements provided in this document will be augmented by additional detailed design data to be documented by the project.

  13. Bilayer graphene quantum dot defined by topgates

    SciTech Connect (OSTI)

    Müller, André; Kaestner, Bernd; Hohls, Frank; Weimann, Thomas; Pierz, Klaus; Schumacher, Hans W.

    2014-06-21

    We investigate the application of nanoscale topgates on exfoliated bilayer graphene to define quantum dot devices. At temperatures below 500 mK, the conductance underneath the grounded gates is suppressed, which we attribute to nearest neighbour hopping and strain-induced piezoelectric fields. The gate-layout can thus be used to define resistive regions by tuning into the corresponding temperature range. We use this method to define a quantum dot structure in bilayer graphene showing Coulomb blockade oscillations consistent with the gate layout.

  14. Form:Define | Open Energy Information

    Open Energy Info (EERE)

    into this field will be used as the name of the term being defined. Example terms Reduced T&D Operations Cost Power Cyber Security Incident ... further results Retrieved from...

  15. Program Evaluation: Define Questions and Methods

    Broader source: Energy.gov [DOE]

    Steps five through eight will help you define the questions your evaluation should address, and develop the methods you'll use to conduct your evaluation (learn more about the other steps in...

  16. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Training and Qualification Plan Examples Example 66 8.2.2 Personnel Training and Qualification The Personnel Training and Qualification program is being established as defined by laws, DOE Orders, and company directives to ensure that personnel are trained and qualified to perform assigned tasks. The training and qualification program develops personnel proficiency commensurate with the scope, complexity, and nature of an assigned activity. Management is responsible for developing staff position

  17. Scoping Meeting Summary, Wailuku, Maui, March 9, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-06

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the program director from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role in ensuring the impartiality and fairness of the meeting. Dr. Lewis further defined the scope of the project, introduced members of the EIS team, briefly described the EIS process, and answered several process questions, noting that cable feasibility would be examined and that Native Hawaiian concerns would be addressed. Ms. Borgstrom stated that the ISIS Implementation Plan will be continuously refined and that impacts of reasonably foreseeable future activities would be examined. During the meeting, more than 90% of the commenters requested that the EIS identify and assess the relative merits and impacts of energy alternatives to the proposed action. Nearly 80% requested that the EIS investigate conservation and renewable forms of energy, such as wind, solar, and biomass. They suggested that integrated resource planning should be used, noting that the State is initiating such a process. More than 30% of the commenters asked that the EIS examine geothermal alternatives to the action including developing geothermal resources on Maui and using geothermal power on Hawai'i only on that island. One commenter proposed an alternative cable route that proceeds from Hawai'i to Lana'i and from Lana'i to Oahu with spur lines to Moloka'i and Maui as needed. Nearly 70% of the commenters made general statements concerning potential short- and long-term environmental costs and impacts of the HGP (particularly on pristine environments). Others were concerned about environmental costs to Maui, particularly the impacts of a land-based cable route on the south side of Maui and on Hawaiian homestead lands. More than half the

  18. doe eis public scoping meeting.ptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 2 3 DEPARTMENT OF ENERGY 4 5 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT 6 STATEMENT FOR THE ACQUISITION OF A NATURAL GAS PIPELINE AND NATURAL GAS UTILITY SERVICE AT THE HANFORD SITE, 7 RICHLAND, WASHINGTON, AND NOTICE OF FLOODPLAINS AND WETLANDS INVOLVEMENT 8 9 10 DOE/EIS-0467 11 12 13 PUBLIC SCOPING MEETING 14 15 February 9, 2012 16 7:00 p.m. 17 Red Lion Hotel and Conference Center 18 Pasco, Washington 19 20 21 22 BRIDGES REPORTING & LEGAL VIDEO 23 Certified Shorthand Reporters

  19. International scoping study: accelerator working group report

    SciTech Connect (OSTI)

    Zisman, Michael; Zisman, M.S.

    2006-09-30

    During the past several years, an International Scoping Study (ISS) of a Neutrino Factory was carried out, with the aim of developing an internationally accepted baseline facility design. Progress toward that goal will be described. Many of the key technical aspects of a Neutrino Factory facility design are presently being investigated experimentally, and the status of these investigations will be mentioned. Plans for the recently launched International Design Study (IDS), which serves as a follow-on to the ISS, will be briefly described.

  20. EIS-0465: Announcement of Public Scoping Meetings

    Broader source: Energy.gov [DOE]

    Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware

  1. U.S. Department of Energy Project Definition Rating Index Guide for Traditional Nuclear and Non-Nuclear Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-07-22

    This DOE Guide provides a tailored model of the CII PDRI for traditional construction projects for use by the DOE programs, as it may apply and is appropriate, when reviewing the levels of adequacy of project scope definition during the project development stages. Admin Chg 1 dated 10-22-2015.

  2. Bureau of Land Management - Examples of Scoping Reports | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Bureau of Land Management - Examples of Scoping ReportsPermittingRegulatory GuidanceSupplemental Material...

  3. EIS-0391: Notice to Extend Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS) and rescheduling the public scoping meetings. PDF icon EIS-0391-NOI-scop-2006....

  4. EIS-0489: Notice of Comment Period Extension and Additional Scoping...

    Broader source: Energy.gov (indexed) [DOE]

    FERC announces the extension of the public comment periond and additional scoping meetings. The comment period has been extended from September 4, 2012 to October 29, 2012. For ...

  5. EIS-0463: Extension of Scoping Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 EIS-0463: Notice of Intent to Prepare a Supplement to the Draft Environmental...

  6. Microsoft PowerPoint - Final CLWR SEIS PUBLIC SCOPING PRESENTATION...

    National Nuclear Security Administration (NNSA)

    Impact Statement for the Impact Statement for the Production of Tritium in a Commercial Light Water Commercial Light Water Reactor Public Scoping Meeting October 20 2011 October ...

  7. Major Risk Factors to the Integrated Facility Disposition Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy to the Integrated Facility Disposition Project Major Risk Factors to the Integrated Facility Disposition Project The scope of the Integrated Facility Disposition Project (IFDP) needs to comprehensively address a wide range of environmental management risks at the Oak Ridge Reservation (ORO). Major Risk Factors to the Integrated Facility Disposition Project (227.35 KB) More Documents & Publications Major Risk Factors Integrated Facility Disposition Project - Oak Ridge

  8. Project Definition Rating Index (PDRI) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Definition Rating Index (PDRI) Project Definition Rating Index (PDRI) The Office of Environmental Management (EM) Project Definition Rating Index (EM-PDRI) is a modification of a commercially developed planning tool that has been tested by an EM team specifically for EM's projects. EM-PDRI Team members represent a number of EM sites, and have already used this project planning tool successfully. The EM-PDRI examines a wide range of project factors related to cost, scope, and schedule, and

  9. A SCOPING STUDY: Development of Probabilistic Risk Assessment Models for Reactivity Insertion Accidents During Shutdown In U.S. Commercial Light Water Reactors

    SciTech Connect (OSTI)

    S. Khericha

    2011-06-01

    This report documents the scoping study of developing generic simplified fuel damage risk models for quantitative analysis from inadvertent reactivity insertion events during shutdown (SD) in light water pressurized and boiling water reactors. In the past, nuclear fuel reactivity accidents have been analyzed both mainly deterministically and probabilistically for at-power and SD operations of nuclear power plants (NPPs). Since then, many NPPs had power up-rates and longer refueling intervals, which resulted in fuel configurations that may potentially respond differently (in an undesirable way) to reactivity accidents. Also, as shown in a recent event, several inadvertent operator actions caused potential nuclear fuel reactivity insertion accident during SD operations. The set inadvertent operator actions are likely to be plant- and operation-state specific and could lead to accident sequences. This study is an outcome of the concern which arose after the inadvertent withdrawal of control rods at Dresden Unit 3 in 2008 due to operator actions in the plant inadvertently three control rods were withdrawn from the reactor without knowledge of the main control room operator. The purpose of this Standardized Plant Analysis Risk (SPAR) Model development project is to develop simplified SPAR Models that can be used by staff analysts to perform risk analyses of operating events and/or conditions occurring during SD operation. These types of accident scenarios are dominated by the operator actions, (e.g., misalignment of valves, failure to follow procedures and errors of commissions). Human error probabilities specific to this model were assessed using the methodology developed for SPAR model human error evaluations. The event trees, fault trees, basic event data and data sources for the model are provided in the report. The end state is defined as the reactor becomes critical. The scoping study includes a brief literature search/review of historical events, developments of

  10. Project management plan for Project W-320, Tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Phillips, D.R.

    1994-12-01

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

  11. The scope of the Weatherization Assistance Program: Profile of the population in need

    SciTech Connect (OSTI)

    Eisenberg, J.F.; Michels, E.; Carroll, D.; Berdux, N.

    1994-03-01

    The U.S. Department of Energy (DOE) is conducting a national evaluation of its Weatherization Assistance Program, an energy efficiency program that provides financial assistance to qualifying low-income households for the {open_quotes}weatherization{close_quotes} of their housing units. The evaluation, being conducted for the Department by Oak Ridge National Laboratory (ORNL), is comprised of five studies. One of the five is a two-part analysis of the scope of the Weatherization Assistance Program and other resources devoted to low-income energy efficiency, including the number of dwellings weatherized to date and the population remaining to be served. This study is referred to here as the {open_quotes}Scope{close_quotes} study. This report presents the results of the second part of the {open_quotes}Scope{close_quotes} study, which investigates the characteristics of the population eligible for and in need of the DOE Weatherization Assistance Program - The Profile of the Population in Need. The {open_quotes}Profile{close_quotes} study is an attempt to use the Energy Information Administration`s Residential Energy Consumption Survey (RECS) for 1990 to define the weatherization-related characteristics of the low-income population. The RECS, a national survey with a sample size of 5,095 households, is the most reliable source for information regarding residential energy-use and housing characteristics because data is collected from fuel vendors on actual household energy bills and consumption for a large and representative sample of households.

  12. The Scope of the Weatherization Assistance Program: Profile of the Population in Need

    SciTech Connect (OSTI)

    Eisenberg, J.F.

    1994-01-01

    The U.S. Department of Energy (DOE) is conducting a national evaluation of its Weatherization Assistance Program, an energy efficiency program that provides financial assistance to qualifying low-income households for the ''weatherization'' of their housing units. The evaluation, being conducted for the Department by Oak Ridge National Laboratory (ORNL), is comprised of five studies. One of the five is a two-part analysis of the scope of the Weatherization Assistance Program and other resources devoted to low-income energy efficiency, including the number of dwellings weatherized to date and the population remaining to be served. This study is referred to here as the ''Scope'' study. This report presents the results of the second part of the ''Scope'' study, which investigates the characteristics of the population eligible for and in need of the DOE Weatherization Assistance Program--The Profile of the Population in Need. The ''Profile'' study is an attempt to use the Energy Information Administration's Residential Energy Consumption Survey (RECS) for 1990 to define the weatherization-related characteristics of the low-income population. The RECS, a national survey with a sample size of 5,095 households, is the most reliable source for information regarding residential energy-use and housing characteristics because data is collected from fuel vendors on actual household energy bills and consumption for a large and representative sample of households.

  13. Software-defined Quantum Communication Systems

    SciTech Connect (OSTI)

    Humble, Travis S; Sadlier, Ronald J

    2014-01-01

    Quantum communication systems harness modern physics through state-of-the-art optical engineering to provide revolutionary capabilities. An important concern for quantum communication engineering is designing and prototyping these systems to prototype proposed capabilities. We apply the paradigm of software-defined communica- tion for engineering quantum communication systems to facilitate rapid prototyping and prototype comparisons. We detail how to decompose quantum communication terminals into functional layers defining hardware, software, and middleware concerns, and we describe how each layer behaves. Using the super-dense coding protocol as a test case, we describe implementations of both the transmitter and receiver, and we present results from numerical simulations of the behavior. We find that while the theoretical benefits of super dense coding are maintained, there is a classical overhead associated with the full implementation.

  14. TCP1 Defined Benefit Pension Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pension Plan (TCP1) TCP1 Defined Benefit Pension Plan Retirement income is based on your age, service credit, and highest-average salary at retirement. Contact Your Pension Resources (YPR) TCP1 Retirement Benefit Programs Pension Plan Retirement income is based on your age, service credit, and the average of your highest 36 consecutive month salaries calculated on your retirement date. In general, the older you are and the more service credit you have, the higher your retirement income will be.

  15. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  16. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  17. Microsoft PowerPoint - 2_FG2 scoping_DOE demonstration program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen 2.0 Jeff Hoffmann U.S. Department of Energy, Office of Major Demonstrations National Environmental Policy Act Public Scoping Meetings June 7-9, 2011 2 What is FutureGen 2.0? * U.S. DOE has awarded $1.05 Billion: - $590 million to Ameren, Babcock & Wilcox and American Air Liquide to test oxy-combustion technology at utility-scale - $459 million to FutureGen Alliance to transport and geologically store the CO 2 - Approximately $1.3B total project value including private cost share *

  18. EA-1903-NoticeofScoping-2012.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Zond Wind Energy Project Manhattan, Kansas The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Kansas State University (KSU) to ...

  19. Advanced CHP Control Algorithms: Scope Specification

    SciTech Connect (OSTI)

    Katipamula, Srinivas; Brambley, Michael R.

    2006-04-28

    The primary objective of this multiyear project is to develop algorithms for combined heat and power systems to ensure optimal performance, increase reliability, and lead to the goal of clean, efficient, reliable and affordable next generation energy systems.

  20. Cementitious waste option scoping study report

    SciTech Connect (OSTI)

    Lee, A.E.; Taylor, D.D.

    1998-02-01

    A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

  1. Scoping Meeting Summary, Kaunakakai, Moloka'i, March 12, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-01

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the program manager from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced members of the EIS team, and briefly described.the EIS process. The overwhelming concerns of the meeting were Native Hawaiian issues. The presenters [more than 70%, most of whom addressed no other issue] want the EIS to respect Native Hawaiian religion, race, rights, language, and culture, noting that they believe that geothermal development is a desecration of Pele [{approx}60% of all presenters]. They expressed concern that their ancestors and burials should not be desecrated. The EIS should address Native Hawaiian concerns that the HGP would negatively impact Native Hawaiian fisheries, subsistence lifestyles, and religious practices. Virtually all the speakers expressed frustration with government. Most (> 70%) of the speakers voiced concern and frustration regarding lack of consideration for Native Hawaiians by government and lack of trust in government. One commenter requested that the EIS should consider the international implications of the U.S allowing their rainforests to be cleared, when the U.S. government asks other nations to preserve theirs. Nearly 30% of the commenters want the EIS to address the concern that people on Moloka'i will bear major environmental consequences of the HGP, but not gain from it. The commenters question whether it is right for Moloka'i to pay for benefits to Oahu, particularly using an unproven technology. After questioning the reliability and feasibility of the marine cable:, nearly 30% of the presenters were concerned about the impacts of the

  2. Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-12

    The scope of this guide includes basic aspects of the development and maintenance of the plan for projects of any size and complexity for the benefit of the federal project director, who is approved by the acquisition executive, and incorporates contractor input as appropriate. Integrated project teams, program managers (if applicable), program offices, acquisition executives, and contractor project managers can also benefit from the suggestions in this guide. Admin Chg 1 dated 10-22-2015.

  3. Project Functions and Activities Definitions for Total Project Cost

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

  4. RP-5 RENEWABLE ENERGY PROJECT

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2003-01-30

    This is the second quarterly technical report for the RP-5 Renewable Energy Project. The report summarizes the work progress, effort and activities that took place during the period of October 1, 2002 to December 31, 2002. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings and discussions that were conducted in order to follow up on potential renewable energy technologies that were identified in the previous report; the technologies were analyzed for their feasibility, suitability and cost effectiveness for this project. This report covers the one-day conceptual design kickoff meeting that took place on November 4, 2002. The meeting was held to discuss the practicality and implementation of potential innovative technologies. Following the kickoff meeting, Inland Empire Utilities Agency (IEUA) and CH2M Hill, the Public Interest Energy Research (PIER) Consultant, held a meeting on December 2, 2002 to discuss the Conceptual Design Report outline and contents in order to clearly present each selected technology along with its evaluation, cost effectiveness and justification. A conference call also took place between the PIER Consultant and IEUA on December 13, 2002, to discuss the overall scope of work for this project. Major project activities in this period include expanded discussions on previous Energy Charrette decisions and recommendations, conceptual design kickoff meeting, conceptual design report, and deciding on the overall project scope of work.

  5. Microsoft Word - FG2_scoping transcript_Tuscola06082011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... agreements; one with a DOE 8 award of approximately 590 million to Ameren, Babcock 9 & Wilcox and American Air Liquide, and the scope of 10 that cooperative agreement is to ...

  6. Radiological Scoping Survey of the Scotia Depot, Scotia, NY

    SciTech Connect (OSTI)

    Bailey, E. N.

    2008-02-25

    The objectives of the radiological scoping survey were to collect adequate field data for use in evaluating the radiological condition of Scotia Depot land areas, warehouses, and support buildings.

  7. Example Retro-Commissioning Scope of Work to Include Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Document offers a ...

  8. EIS-0472: Notice of Public Scoping Meetings and Extension of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE's ULP. On June 21, 2011, DOE announced in the Federal Register (76 FR 36097) its intention to prepare the PEIS and opened a scoping period which would have closed August 22,...

  9. Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping

    Broader source: Energy.gov [DOE]

    As part of its continuing oversight of the implementation of the NEPA regulations, the Council on Environmental Quality has been investigating agency experience with scoping. This is the process by...

  10. Scoping Inventory Calculations for the Rare Isotope Accelerator

    SciTech Connect (OSTI)

    Ahle, L E; Boles, J L

    2003-07-25

    This document is a report on our activities in FY03 exploring nuclear safety and hazard analysis issues relevant to the Rare Isotope Accelerator (RIA). It is not clear whether DOE will classify the RIA as an accelerator facility subject to the accelerator-specific safety requirements of DOE Order 420.2A or as a nonreactor nuclear facility subject to the requirements of 10 CFR 830. The final outcome of this issue will have significant impact on the construction and operation of the facility and the quality assurance requirements for items or services that may affect nuclear safety. The resolution of this issue will be an important earlier decision for the RIA project team and will require early consultation with the appropriate DOE authorities. For nuclear facilities, facility hazard classification depends on the inventory of releasable radionuclides; therefore, some simplistic, scoping inventory calculations for some assumed targets and beams are done to estimate the hazard category of RIA if it is declared a nuclear facility. These calculations show that for the scenarios analyzed, RIA would produce sufficient quantities of radionuclides to be classified as a Category 3 nuclear facility. Over the lifetime of RIA operations, it may be possible to build up Category 2 quantities of {sup 227}Ac and {sup 228}Th. A storage building, separate from the driver, target, and experimental buildings, used to store and isolate accumulated targets and other hardware, can mitigate the potential impact on RIA. The more onerous requirements of Category 2 facilities would only be imposed on the storage facility and not on the rest of the RIA facilities. Some of the differences in a category 2 and category 3 facility are discussed in Appendix 1.

  11. Federal Government Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as ... ESCOs in a similar climate zone (based on ASHRAE climate zones) or market segment (e.g., ...

  12. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    SciTech Connect (OSTI)

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  13. DC Microgrids Scoping Study: Estimate of Technical and Economic Benefits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (March 2015) | Department of Energy Microgrids Scoping Study: Estimate of Technical and Economic Benefits (March 2015) DC Microgrids Scoping Study: Estimate of Technical and Economic Benefits (March 2015) Microgrid demonstrations and deployments have shown the ability of microgrids to provide higher reliability and higher power quality than utility power systems and improved energy utilization. The vast majority of these microgrids are based on AC power, but some manufacturers, power system

  14. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  15. Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 22, 2002-July 22, 2002 | Department of Energy Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 A report showing a comparative scooping economic analysis of 19 pathways for producing, handling, distributing, and dispensing hydrogen for fuel cell vehicle applications. 32525.pdf (1.48 MB) More Documents & Publications Analysis of a Cluster

  16. Probabilistic model better defines development well risks

    SciTech Connect (OSTI)

    Connolly, M.R.

    1996-10-14

    Probabilistic techniques to compare and rank projects, such as the drilling of development wells, often are more representative than decision tree or deterministic approaches. As opposed to traditional deterministic methods, probabilistic analysis gives decision-makers ranges of outcomes with associated probabilities of occurrence. This article analyzes the drilling of a hypothetical development well with actual field data (such as stabilized initial rates, production declines, and gas/oil ratios) to calculate probabilistic reserves, and production flow streams. Analog operating data were included to build distributions for capital and operating costs. Economics from the Monte Carlo simulation include probabilistic production flow streams and cost distributions. Results include single parameter distributions (reserves, net present value, and profitability index) and time function distributions (annual production and net cash flow).

  17. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect (OSTI)

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  18. Defining the Mechanisms of Friction: A Grand Challenge in Interfacial...

    Office of Scientific and Technical Information (OSTI)

    Defining the Mechanisms of Friction: A Grand Challenge in Interfacial Mechanics. Citation Details In-Document Search Title: Defining the Mechanisms of Friction: A Grand Challenge...

  19. DOE Materials-Based Hydrogen Storage Summit: Defining Pathways...

    Office of Environmental Management (EM)

    Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive Applications DOE Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive ...

  20. Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Conference: Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. Citation Details In-Document Search Title: Interferometrically Defined 3D Pyrolyzed-Carbon Sensors. Abstract ...

  1. Defining a Standard Metric for Electricity Savings

    SciTech Connect (OSTI)

    Brown, Marilyn; Akbari, Hashem; Blumstein, Carl; Koomey, Jonathan; Brown, Richard; Calwell, Chris; Carter, Sheryl; Cavanagh, Ralph; Chang, Audrey; Claridge, David; Craig, Paul; Diamond, Rick; Eto, Joseph H.; Fulkerson, William; Gadgil, Ashok; Geller, Howard; Goldemberg, Jose; Goldman, Chuck; Goldstein, David B.; Greenberg, Steve; Hafemeister, David; Harris, Jeff; Harvey, Hal; Heitz, Eric; Hirst, Eric; Hummel, Holmes; Kammen, Dan; Kelly, Henry; Laitner, Skip; Levine, Mark; Lovins, Amory; Masters, Gil; McMahon, James E.; Meier, Alan; Messenger, Michael; Millhone, John; Mills, Evan; Nadel, Steve; Nordman, Bruce; Price, Lynn; Romm, Joe; Ross, Marc; Rufo, Michael; Sathaye, Jayant; Schipper, Lee; Schneider, Stephen H; Sweeney, James L; Verdict, Malcolm; Vorsatz, Diana; Wang, Devra; Weinberg, Carl; Wilk, Richard; Wilson, John; Worrell, Ernst

    2009-03-01

    The growing investment by governments and electric utilities in energy efficiency programs highlights the need for simple tools to help assess and explain the size of the potential resource. One technique that is commonly used in this effort is to characterize electricity savings in terms of avoided power plants, because it is easier for people to visualize a power plant than it is to understand an abstraction such as billions of kilowatt-hours. Unfortunately, there is no standardization around the characteristics of such power plants. In this letter we define parameters for a standard avoided power plant that have physical meaning and intuitive plausibility, for use in back-of-the-envelope calculations. For the prototypical plant this article settles on a 500 MW existing coal plant operating at a 70percent capacity factor with 7percent T&D losses. Displacing such a plant for one year would save 3 billion kW h per year at the meter and reduce emissions by 3 million metric tons of CO2 per year. The proposed name for this metric is the Rosenfeld, in keeping with the tradition among scientists of naming units in honor of the person most responsible for the discovery and widespread adoption of the underlying scientific principle in question--Dr. Arthur H. Rosenfeld.

  2. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  3. Demand Responsive Lighting: A Scoping Study

    SciTech Connect (OSTI)

    Rubinstein, Francis; Kiliccote, Sila

    2007-01-03

    The objective of this scoping study is: (1) to identify current market drivers and technology trends that can improve the demand responsiveness of commercial building lighting systems and (2) to quantify the energy, demand and environmental benefits of implementing lighting demand response and energy-saving controls strategies Statewide. Lighting systems in California commercial buildings consume 30 GWh. Lighting systems in commercial buildings often waste energy and unnecessarily stress the electrical grid because lighting controls, especially dimming, are not widely used. But dimmable lighting equipment, especially the dimming ballast, costs more than non-dimming lighting and is expensive to retrofit into existing buildings because of the cost of adding control wiring. Advances in lighting industry capabilities coupled with the pervasiveness of the Internet and wireless technologies have led to new opportunities to realize significant energy saving and reliable demand reduction using intelligent lighting controls. Manufacturers are starting to produce electronic equipment--lighting-application specific controllers (LAS controllers)--that are wirelessly accessible and can control dimmable or multilevel lighting systems obeying different industry-accepted protocols. Some companies make controllers that are inexpensive to install in existing buildings and allow the power consumed by bi-level lighting circuits to be selectively reduced during demand response curtailments. By intelligently limiting the demand from bi-level lighting in California commercial buildings, the utilities would now have an enormous 1 GW demand shed capability at hand. By adding occupancy and light sensors to the remotely controllable lighting circuits, automatic controls could harvest an additional 1 BkWh/yr savings above and beyond the savings that have already been achieved. The lighting industry's adoption of DALI as the principal wired digital control protocol for dimming ballasts and

  4. Scoping Meeting Summary, Honolulu, Oahu, March 14, 1992, 2 PM Session

    SciTech Connect (OSTI)

    Quinby-Hunt, Mary S.

    1992-06-10

    The meeting began with presentations by the facilitator, Mr. Spiegel, and Dr. Lewis, the representative from DOE. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced members of the EIS team, and briefly described the EIS process. Ninety percent of those presenting expressed concern about the potential impacts of the HGP to the environment. They asked that the EIS investigate the impacts of 1.he HGP on quality of air, water and soils, flora and fauna, land, socioeconomics, religion and culture. Seventy percent of the commenters want the EIS to investigate the impacts of all components of the HGP (eg. generation facilities, pipes, roads, drill pads, transmission corridors, and cable) on terrestrial ecosystems (e.g. the rainforest), threatened and endangered species, species diversity, species used for ritual or medicinal purposes, and climate stability. The EIS should address the effects of segmentation of habitat, introduction of exotic species, acid rain, herbicides, and enhanced fire danger. It should consider the entire Kilauea East Rift Zone when studying the impacts of HGP on the ecology of the Puna District. Of importance is the interrelationship between the lava, the biota of the region, and the regeneration that occurs following an eruption. DOE should examine the impacts of the network of roads that would be constructed for the HGP. Roads may serve as barriers that segment habitats, prevent regeneration and natural spread of biota, or serve as conduits for introduction of exotic species or for mobilization of herbicides. They may enhance the potential for logging or collecting of endangered native species. The EIS should determine the impacts

  5. National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements

    SciTech Connect (OSTI)

    Schiller Consulting, Inc.; Schiller, Steven R.; Goldman, Charles A.; Galawish, Elsia

    2011-02-04

    This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national EM&V standard is that such a standard is

  6. Software-Defined Solutions for Managing Energy Use in Small Commercial Buildings

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lead Performer: University of California, Berkeley Project Partners: -- California Institute for Energy & Enviornment - Berkeley, CA -- Software Defined Buildings/EECS/UC Berkeley - Berkeley, CA -- Western Regional Cooling Center/UC Davis - Davis, CA -- Lawrence Berkeley National Laboratory - Berkeley, CA -- Building Robotics - Oakland, CA

  7. The TITAN Reversed-Field Pinch fusion reactor study: Scoping phase report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    The TITAN research program is a multi-institutional effort to determine the potential of the Reversed-Field Pinch (RFP) magnetic fusion concept as a compact, high-power-density, and ''attractive'' fusion energy system from economic (cost of electricity, COE), environmental, and operational viewpoints. In particular, a high neutron wall loading design (18 MW/m/sup 2/) has been chosen as the reference case in order to quantify the issue of engineering practicality, to determine the physics requirements and plasma operating mode, to assess significant benefits of compact systems, and to illuminate the main drawbacks. The program has been divided into two phases, each roughly one year in length: the Scoping Phase and the Design Phase. During the scoping phase, the TITAN design team has defined the parameter space for a high mass power density (MPD) RFP reactor, and explored a variety of approaches to the design of major subsystems. Two major design approaches consistent with high MPD and low COE, the lithium-vanadium blanket design and aqueous loop-in-pool design, have been selected for more detailed engineering evaluation in the design phase. The program has retained a balance in its approach to investigating high MPD systems. On the one hand, parametric investigations of both subsystems and overall system performance are carried out. On the other hand, more detailed analysis and engineering design and integration are performed, appropriate to determining the technical feasibility of the high MPD approach to RFP fusion reactors. This report describes the work of the scoping phase activities of the TITAN program. A synopsis of the principal technical findings and a brief description of the TITAN multiple-design approach is given. The individual chapters on Plasma Physics and Engineering, Parameter Systems Studies, Divertor, Reactor Engineering, and Fusion Power Core Engineering have been cataloged separately.

  8. REDUCTIONS WITHOUT REGRET: DEFINING THE NEEDED CAPABILITIES

    SciTech Connect (OSTI)

    Swegle, J.; Tincher, D.

    2013-09-10

    This is the second of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as some closing thoughts for the future. This paper begins with a discussion of the current nuclear force and the plans and procurement programs for the modernization of that force. Current weapon systems and warheads were conceived and built decades ago, and procurement programs have begun for the modernization or replacement of major elements of the nuclear force: the heavy bomber, the air-launched cruise missile, the ICBMs, and the ballistic-missile submarines. In addition, the Nuclear Weapons Council has approved a new framework for nuclear-warhead life extension � not fully fleshed out yet � that aims to reduce the current number of nuclear explosives from seven to five, the so-called �3+2� vision. This vision includes three interoperable warheads for both ICBMs and SLBMs (thus eliminating one backup weapon) and two warheads for aircraft delivery (one gravity bomb and one cruise-missile, eliminating a second backup gravity bomb). This paper also includes a discussion of the current and near-term nuclear-deterrence mission, both global and regional, and offers some observations on future of the strategic deterrence mission and the challenges of regional and extended nuclear deterrence.

  9. Spent Nuclear Fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C.

    1995-10-03

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  10. Scoping study: Substation design workstation. Final report

    SciTech Connect (OSTI)

    Mauser, S.F.; Conroy, M.W.; Singh, N.M.

    1993-03-01

    This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

  11. Award No. DE-FC36-10GO10589, Statement of Project Objectives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT OBJECTIVES 212 Degrees Consulting, LLC, Las Vegas, NV. Recovery Act: Demonstration project for deployment of alternative energy systems. A. PROJECT OBJECTIVES  Demonstrate the viability of wind turbine and solar cell generation systems within various urban environments, geographically located in areas conducive to solar and eolian technologies.  The demonstration project will show that at least 35% of the energy used within the test area is self generated. B. PROJECT SCOPE

  12. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  13. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  14. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  15. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  16. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect (OSTI)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  17. ESPC ENABLE Scope of Work Template and Guide

    Broader source: Energy.gov [DOE]

    Document provides a template to be drafted by the agency and presented to energy service company (ESCO) prior to the kickoff meeting for the investment grade audit (IGA). The scope of work (SOW) will then be included in the ESCO's final proposal, which is presented to the agency after the IGA and prior to final negotiations.

  18. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  19. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  20. Field-Reversed Configuration Power Plant Critical-Issue Scoping Study

    SciTech Connect (OSTI)

    Santarius, J. F.; Mogahed, E. A.; Emmert, G. A.; Khater, H. Y.; Nguyen, C. N.; Ryzhkov, S. V.; Stubna, M. D.

    2000-03-31

    A team from the Universities of Wisconsin, Washington, and Illinois performed an engineering scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis for deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core. For the engineering conceptual design of the fusion core, the project team focused on intermediate-term technology. For example, one decision was to use steele structure. The FRC systems analysis led to a fusion power plant with attractive features including modest size, cylindrical symmetry, good thermal efficiency (52%), relatively easy maintenance, and a high ratio of electric power to fusion core mass, indicating that it would have favorable economics.

  1. Project W-420 stack monitoring system upgrades

    SciTech Connect (OSTI)

    CARPENTER, K.E.

    1999-02-25

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420.

  2. EIS-0385-S1: Notice of Additional Public Scoping Meeting | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Public Scoping Meeting EIS-0385-S1: Notice of Additional Public Scoping Meeting Site Selection for the Expansion of the Strategic Petroleum Reserve On March 5, 2008, the...

  3. Microsoft Word - OE ORNL Materials Innovation for Grid Workshop Scoping Document FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MATERIALS INNOVATION FOR NEXT GENERATION T&D GRID COMPONENTS October 2015 Energetics Incorporated SCOPING DOCUMENT Materials Innovation for Next Generation T&D Grid Components: Scoping Document October 2015 i CONTENTS 1. Introduction ............................................................................................................................................................... 1 Purpose

  4. Defining Genome Project Standards in a New Era of Sequencing (GSC8 Meeting)

    ScienceCinema (OSTI)

    Chain, Patrick [DOE JGI

    2011-04-28

    The Genomic Standards Consortium was formed in September 2005. It is an international, open-membership working body which promotes standardization in the description of genomes and the exchange and integration of genomic data. The 2009 meeting was an activity of a five-year funding "Research Coordination Network" from the National Science Foundation and was organized held at the DOE Joint Genome Institute with organizational support provided by the JGI and by the University of California - San Diego.

  5. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT INCREASED LIQUID LEVEL ANALYSIS FOR 241-AP TANK FARMS

    SciTech Connect (OSTI)

    MACKEY TC; DEIBLER JE; JOHNSON KI; PILLI SP; KARRI NK; RINKER MW; ABATT FG; CARPENTER BG

    2007-02-16

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the SDT System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

  6. External Independent Review (EIR) Scoping Meeting Agreement Form...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Acquisition and Project Management (OAPM) must perform a Performance ... expectations for both the CD-2 and CD-3 EIR, and thereby facilitate the project planning process. ...

  7. YUCCA MOUNTAIN PROJECT - A BRIEFING --

    SciTech Connect (OSTI)

    NA

    2003-08-05

    This report has the following articles: Nuclear waste--a long-term national problem; Spent nuclear fuel; High-level radioactive waste; Radioactivity and the environment; Current storage methods; Disposal options; U.S. policy on nuclear waste; The focus on Yucca Mountain; The purpose and scope of the Yucca Mountain Project; The approach for permanently disposing of waste; The scientific studies at Yucca Mountain; The proposed design for a repository at Yucca Mountain; Natural and engineered barriers would work together to isolate waste; Meticulous science and technology to protect people and the environment; Licensing a repository; Transporting waste to a permanent repository; The Environmental Impact Statement for a repository; Current status of the Yucca Mountain Project; and Further information available on the Internet.

  8. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  9. Project Benefits

    Broader source: Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  10. Hydropower Projects

    Broader source: Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  11. FEDERAL LOAN GUARANTEE SOLICITATION & SUPPLEMENTS FOR: ADVANCED NUCLEAR ENERGY PROJECTS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ADVANCED NUCLEAR ENERGY PROJECTS U.S. Department of Energy Loan Programs Office Solicitation Number: DE-SOL-0007791 INCLUDED DOCUMENTS (UPDATED: January 19, 2016) Document Issue Date Subject Solicitation Section Affected SOLICITATION December 10, 2014 Solicitation for Advanced Nuclear Energy Projects SUPPLEMENT I June 23, 2015 Scope of Projects Eligible II.C. inserted after II.B (p. 3) SUPPLEMENT II November 6, 2015 Early Upstream and Engineering Project Costs II.D inserted after II.C (p. 3)

  12. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork You are ...

  13. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Germicidal ...

  14. Defining the Effectiveness of UV Lamps Installed in Circulating...

    Office of Scientific and Technical Information (OSTI)

    Installed in Circulating Air Ductwork Citation Details In-Document Search Title: Defining the Effectiveness of UV Lamps Installed in Circulating Air Ductwork Ultraviolet; UV; ...

  15. Structures of Cyanobactin Maturation Enzymes Define a Family...

    Office of Scientific and Technical Information (OSTI)

    Structures of Cyanobactin Maturation Enzymes Define a Family of Transamidating Proteases Citation Details In-Document Search Title: Structures of Cyanobactin Maturation Enzymes ...

  16. Defining the functional determinants for RNA surveillance by...

    Office of Scientific and Technical Information (OSTI)

    Defining the functional determinants for RNA surveillance by RIG-I Citation Details ... Research Org: Advanced Photon Source (APS), Argonne National Laboratory (ANL), Argonne, IL ...

  17. Improving the Quality and Scope of EIA Data

    Reports and Publications (EIA)

    2011-01-01

    Section 805(a) of the Energy Independence and Security Act of 2007 (EISA), Public Law 110-1401 requires the U.S. Energy Information Administration (EIA) to establish a five-year plan to enhance the quality and scope of its data collection necessary to ensure that the scope, accuracy, and timeliness of the information needed for efficient functioning of energy markets and related financial operations. This report is in response to section 805(b) of EISA which calls on EIA to submit to Congress the plan established under subsection (a), including a description of any improvements needed to enhance the ability of the Administrator to collect and process energy information in a manner consistent with the needs of energy markets.

  18. Earthquake warning system for infrastructures : a scoping analysis.

    SciTech Connect (OSTI)

    Brodsky, Nancy S.; O'Connor, Sharon L.; Stamber, Kevin Louis; Kelic, Andjelka; Fogleman, William E.; Vugrin, Eric D.; Corbet, Thomas Frank, Jr.; Brown, Theresa Jean

    2011-09-01

    This report provides the results of a scoping study evaluating the potential risk reduction value of a hypothetical, earthquake early-warning system. The study was based on an analysis of the actions that could be taken to reduce risks to population and infrastructures, how much time would be required to take each action and the potential consequences of false alarms given the nature of the action. The results of the scoping analysis indicate that risks could be reduced through improving existing event notification systems and individual responses to the notification; and production and utilization of more detailed risk maps for local planning. Detailed maps and training programs, based on existing knowledge of geologic conditions and processes, would reduce uncertainty in the consequence portion of the risk analysis. Uncertainties in the timing, magnitude and location of earthquakes and the potential impacts of false alarms will present major challenges to the value of an early-warning system.

  19. Fast Flux Test Facility transition project resource loaded schedule. Revision 1

    SciTech Connect (OSTI)

    Hulvey, R.K.

    1994-10-31

    Revision 1 of the Fast Flux Test Facility (FFTF) Transition Project Resource Loaded Schedule (RLS) provides detail to manage the major elements, project baseline and cost estimate for the FFF Transition Project within the Advanced Reactors Transition Program, comprised of Activity Data Sheets (ADS) 6640, 6641, and 6642. The scope includes all work in the Budget and Reporting categories of Program Integration (PI), Surveillance and Maintenance (S and M), and Deactivation/Compliance (D/C). The transition activities are necessary to bring the FFTF and related facilities to a safe deactivation state, while maintaining worker health and safety. The scope of ADS 6640 and 6642 is the FFTF Transition Project while the scope of ADS 6641 is the Hanford Site Nuclear Energy Legacies.

  20. Further Developments on the Geothermal System Scoping Model: Preprint

    SciTech Connect (OSTI)

    Antkowiak, M.; Sargent, R.; Geiger, J. W.

    2010-07-01

    This paper discusses further developments and refinements for the uses of the Geothermal System Scoping Model in an effort to provide a means for performing a variety of trade-off analyses of surface and subsurface parameters, sensitivity analyses, and other systems engineering studies in order to better inform R&D direction and investment for the development of geothermal power into a major contributor to the U.S. energy supply.

  1. Community Wind Handbook/Research Project Economics & Financing...

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Research Project Economics & Financing Generally defined as the amount of time it...

  2. UMTRA Project document control system manual

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This manual defines the Project Document Control System (PDCS) operated by the US DOE Uranium Mill tailings Remedial Action (UMTRA) project Office. The purpose of the PDCS is to provide an active and continuing program for acquiring, controlling, retaining, retrieving, retiring and disposing of all UMTRA Project documents. The PDCS also provides guidance and coordination in transferring documents by various UMTRA Projection document control centers to a central location.

  3. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    SciTech Connect (OSTI)

    Pratt, Joseph William; Harris, Aaron P

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  4. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  5. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Sandia National Laboratories study examines the feasibility of a hydrogen-fueled PEM fuel cell barge to provide electrical power to vessels at anchorage or at berth.

  6. Post Secondary Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post Secondary Project Performance Benchmarks (All ASHRAE Zones) continued > We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach

  7. Public Housing Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Housing Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach documented in Hopper et

  8. RP-5 Renewable Energy Efficiency Project

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2004-01-29

    This is the sixth quarterly technical report for the RP-5 Renewable Energy Efficiency Project. The report summarizes the work progress, effort and activities that took place during the period from October 1, 2003 through December 31, 2003. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. In coordination with the DOE, IEUA has revised the original Cooperative Agreement to reflect the actual and current project scope of work. The original Agreement statement of work (SOW) included conceptual and preliminary equipment and systems, which were further evaluated for feasibility and suitability for the project. As a result, some of the equipment was taken out of the project scope. In response to questions from the DOE, IEUA has submitted a summary report on the Organic Rankine Cycle (ORC) secondary power generation units for availability and suitability for this project and associated safety concerns pointed out by the DOE. IEUA has awarded the consulting engineering contract to Parsons Water and Infrastructure, Inc. to provide the project's design and construction services. The project's pre-design kickoff meeting was held at IEUA's headquarters on December 11, 2003. IEUA has submitted a proposal for a grant offered by California Energy Commission (CEC) which if awarded to IEUA, will add value to this project. IEUA has finalized and signed the agreement with Stirling Energy Systems (SES) to host a 25 kW Stirling Engine at the RP-5 plant site for reliability and performance testing using digester and natural gas. As a result of further evaluation of the flexible microturbine system, IEUA has decided to take it out of the project's scope of work; however, it may be considered in future projects at other locations. IEUA has installed a 60 kW Photovoltaic (PV) power generation system on the roof of the new headquarters building. A matching funds update is also included in the Results and Discussion section. The update presents the

  9. Final project report

    SciTech Connect (OSTI)

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  10. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  11. Capital Asset Project List.xls

    Broader source: Energy.gov (indexed) [DOE]

    as defined by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. CD0 Approve Mission Need CD1 Approve Alternative Selection and Cost Range CD2...

  12. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect (OSTI)

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and

  13. NERSC-9 Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    prepare an Environmental Impact Report (EIR) to review the potential environmental ... potential issues to be addressed in the EIR. The NOP, Initial Study, scoping meeting ...

  14. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Tour Project Tour See NMSSUP from the ground NMSSUP Phase II Construction Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the tour, transportation will be provided back to Hilton Santa Fe Buffalo Thunder. What to wear Wear comfortable pants and leather shoes (flat, comfortable, closed-toe; no tennis shoes or high heels). Schedule There will be a one-hour, no-host lunch

  15. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  16. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  17. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  18. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  19. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  20. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  1. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San ...

  2. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect (OSTI)

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  3. The screening and scoping of Environmental Impact Assessment and Strategic Environmental Assessment of Carbon Capture and Storage in the Netherlands

    SciTech Connect (OSTI)

    Koornneef, J.; Faaij, A.; Turkenburg, W.

    2008-08-15

    The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projects for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO{sub 2}. Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them.

  4. A major lithospheric boundary in eastern California defined by...

    Open Energy Info (EERE)

    traditionally defined 0.706 line in the southern Sierra Nevada. Authors Glazner, A.F.; Miller and J.S. Published Abstracts with Programs - Geological Society of America, 111997...

  5. Yeager Airport Hydrogen Vehicle Test Project

    SciTech Connect (OSTI)

    Davis, Williams

    2015-10-01

    The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

  6. New IEC Specifications Help Define Wind Plant Performance Reporting Metrics

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy IEC Specifications Help Define Wind Plant Performance Reporting Metrics New IEC Specifications Help Define Wind Plant Performance Reporting Metrics January 6, 2014 - 10:00am Addthis This is an excerpt from the Fourth Quarter 2013 edition of the Wind Program R&D Newsletter. The U.S. Department of Energy Wind Program and Sandia National Laboratories have been working with the International Electrotechnical Commission (IEC) Committee on wind turbine availability to

  7. Executive Orders Defining Tribal Relationships | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Orders Defining Tribal Relationships Executive Orders Defining Tribal Relationships Executive Order 13592 Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011). Superseded EO 13021 to ensure that all American Indian students, regardless of which institution they attend, receive support from the federal government at elementary through college levels. This EO also creates an Interagency Working Group on AI/AN

  8. Comparing Well-Defined Manganese, Iron, Cobalt, and Nickel Ketone

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrosilylation Catalysts Comparing Well-Defined Manganese, Iron, Cobalt, and Nickel Ketone Hydrosilylation Catalysts Authors: Trovitch, R.J. Title: Comparing Well-Defined Manganese, Iron, Cobalt, and Nickel Ketone Hydrosilylation Catalysts Source: Synlett Year: 2014 Volume: published online May 8, 2014 Pages: ABSTRACT: A brief review of manganese-catalyzed hydrosilylation is presented along with a personal account of how the design for the highly active catalyst, (Ph2PPrPDI)Mn, was

  9. PBS ABB Title ABB Description/Scope ORP-0014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Title ABB Description/Scope ORP-0014 242A Evaporator/222-S Laboratory * Operate and maintain the 242-A Evaporator * 222-S Safe and Compliant Operations * 222-S Facililty Reliability * 222-S Analytical Support/Equipment * 222-S Process Chemistry and Waste Handling ORP-0014 A/AX - Farm Retrieval Design, procurement, construction, readiness assessments, start-up, and operations of waste retrieval systems for 241-A and 241-AX Tank Farms. New systems will: 1) retrieve waste from 241-A and 241-AX

  10. ESnet's Fasterdata Site Growing in Scope, Popularity in Increasingly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data-Driven World ESnet's Fasterdata Site Growing in Scope, Popularity in Increasingly Data-Driven World News & Publications ESnet News Media & Press Publications and Presentations Galleries ESnet Awards and Honors Contact Us Media Jon Bashor, jbashor@lbl.gov, +1 510 486 5849 or Media@es.net Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site

  11. Microsoft Word - FG2_scoping transcript_Taylorville06072011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 1 2 3 4 5 FUTUREGEN 2.0 PROGRAM 6 PUBLIC SCOPING MEETING 7 8 TAYLORVILLE HIGH SCHOOL 9 TAYLORVILLE, ILLINOIS 10 JUNE 7, 2011 11 12 13 14 15 Representatives: 16 Mr. Cliff Whyte, Department of Energy Mr. Jeff Hoffmann, Department of Energy 17 Mr. Michael Long, Ameren Energy Resources Mr. Gordon Beeman, FutureGen Alliance 18 19 20 Court Reporter: 21 Rhonda K. O'Neal, CSR/RPR Illinois CSR #084-004158 22 Midwest Litigation Services 15 South Old State Capitol Plaza 23 Springfield, Illinois 62701

  12. Microsoft Word - FG2_scoping transcript_Tuscola06082011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FUTUREGEN 2.0 PROGRAM 2 PUBLIC SCOPING MEETING 3 4 5 6 IRONHORSE GOLF CLUB 7 2000 IRON HORSE DRIVE 8 TUSCOLA, ILLINOIS 9 JUNE 8, 2011 10 11 12 13 14 Representatives: 15 Mr. Cliff Whyte, Department of Energy Mr. Jeff Hoffmann, Department of Energy 16 Mr. Michael Long, Ameren Energy Resources Mr. Gordon Beeman, FutureGen Alliance 17 18 19 20 Court Reporter: Jennifer L. Crowe, CSR 21 Illinois CSR #084-003786 Midwest Litigation Services 22 15 S. Old State Capitol Plaza Springfield, Illinois 62701

  13. I RADIOLOGICAL SCOPING SURVEY OF FO,RMER MONSANTO' FACILITIES

    Office of Legacy Management (LM)

    -I a.d *4dk *-f--l- --- I. ,e-- - .- --_ -- -. ;,. -* " . I . RADIOLOGICAL SCOPING SURVEY OF FO,RMER MONSANTO' FACILITIES (Unit XII and W a rehouse) DAYTON, OHIO Report Date: 4 September 1997 Survey Dak 27 Aitgust 1991 Prepared by: Mark L. Mays, Chief Radiation Safety Branch Sponsored by: M iamisburg Environmental Matigement Reject Office Ohio FTekl Ofice U.S.. Department of Energy Conducted by: %diation Safety Branch Of&e of Environmental Management ggtb Air Base W ing U.S. Departmtnt

  14. Awarded projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  15. International Research Reactor Decommissioning Project

    SciTech Connect (OSTI)

    Leopando, Leonardo; Warnecke, Ernst

    2008-01-15

    Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement to the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.

  16. EIS-0183: Notice of Extension of Scoping Period

    Broader source: Energy.gov [DOE]

    Administration-Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California

  17. EIS-0465: Scoping Meeting Transcript, 3/24/2011

    Broader source: Energy.gov [DOE]

    Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware

  18. EIS-0465: Scoping Meeting Transcript, 3/22/2011

    Broader source: Energy.gov [DOE]

    Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware

  19. EIS-0465: Scoping Meeting Transcript, 3/23/2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware

  20. ConocoPhillips Sweeny IGCC/CCS Project

    SciTech Connect (OSTI)

    Paul Talarico; Charles Sugg; Thomas Hren; Lauri Branch; Joseph Garcia; Alan Rezigh; Michelle Pittenger; Kathleen Bower; Jonathan Philley; Michael Culligan; Jeremy Maslen; Michele Woods; Kevin Elm

    2010-06-16

    DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

  1. Letter: Mission, Objectives & Scope of the Site Specific Advisory Board |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Letter: Mission, Objectives & Scope of the Site Specific Advisory Board From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (T. Martin, J. Beirer, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) This letter reiterates the mission, objectives, and scope of the local Site Specific Advisory Boards (SSABs) associated with nine Department of Energy

  2. Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1

    Broader source: Energy.gov [DOE]

    Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Scope Change #1

  3. EIS-0385: Notice to Extend the Public Scoping Period and Reschedule...

    Broader source: Energy.gov (indexed) [DOE]

    Due to the extraordinary circumstances created by Hurricane Katrina in the region where the proposed action and public scoping meetings will take place, DOE has extended the...

  4. EIS-0463: Amended Notice of Intent To Modify the Scope of the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy - Presidential Permit Application for Northern Pass Transmission, New Hampshire DOE announces its intent to modify the scope of the Northern Pass Transmission ...

  5. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    SciTech Connect (OSTI)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  6. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  7. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  8. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    William Apel and Frank Roberto at) the Biotechnology Department at the INEEL. Each part of this project is funded under a different contract with the Science Division of the US ...

  9. EGS Projects

    Broader source: Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  10. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects » Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate

  11. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  12. Spent nuclear fuel project systems engineering management plan

    SciTech Connect (OSTI)

    Womack, J.C., Westinghouse Hanford

    1996-07-19

    The purpose of this document is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices. The methodology promotes and ensures sound management of the SNF Project. The scope of the document encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project including risk management process, design authority/design agent concept, and documentation responsibilities. This implementation applies to, and is tailored to the needs of the SNF Project and all its Subprojects, including all current and future Subprojects.

  13. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  14. Instream Flow Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instream Flow Project Instream Flow Project As a part of the Department of Energy's Water Power Program, the Instream Flow Project was carried out by Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Argonne National Laboratory to develop tools aimed at defining environmental flow needs for hydropower operations. Characterizing Sub-Daily Flow Regimes May 2014 (1.41 MB) Updating the U.S. Hydrologic Classification July 2013 (1.26 MB) A Holistic Framework for Environmental

  15. Defining a region of optimization based on engine usage data

    DOE Patents [OSTI]

    Jiang, Li; Lee, Donghoon; Yilmaz, Hakan; Stefanopoulou, Anna

    2015-08-04

    Methods and systems for engine control optimization are provided. One or more operating conditions of a vehicle engine are detected. A value for each of a plurality of engine control parameters is determined based on the detected one or more operating conditions of the vehicle engine. A range of the most commonly detected operating conditions of the vehicle engine is identified and a region of optimization is defined based on the range of the most commonly detected operating conditions of the vehicle engine. The engine control optimization routine is initiated when the one or more operating conditions of the vehicle engine are within the defined region of optimization.

  16. Smart Grid Demonstration Project

    SciTech Connect (OSTI)

    Miller, Craig; Carroll, Paul; Bell, Abigail

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  17. Microsoft Word - EPS WBS Scope Statement Rev 2.docx

    National Nuclear Security Administration (NNSA)

    activities necessary to provide project management support associated with the M&O's UGTA drilling campaigns and other field support activities. In addition, the contractor will...

  18. Scope Management Baseline Development (FPM 208), Idaho | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This is a Level 2 core course for certification in the Project Management Career ... credit. Course Format: 3 day Instructor-led classroom delivery Equivalent Courses: None

  19. EA-1852: Notice of Scoping | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Cloud County Community College Wind Energy Technology Project, Cloud County, Kansas U.S. Department of Energy (DOE) is proposing to authorize expenditure of federal funds by Cloud...

  20. Outage project productivity improvement of TVA fossil

    SciTech Connect (OSTI)

    Picard, H.E.; Seay, C.R. Jr.

    1996-10-01

    Competition in the utility industry forces management to look closely at the cost effectiveness of power plant outage projects. At TVA Fossil and Hydro Power, innovative work measurement is proving effective as a project management tool to do more with less. Labor-hours to complete outage work scopes are reduced by some 20 to 30%, not by working harder or sacrificing safety, or quality, but by working and managing smarter. Fossil power plant outages and shutdowns are costly. They are labor-intensive construction projects, often with expanding work scope, and executed on a fast track. Outage work is inherently complex and dynamic, and often unpredictable. Many activities and tasks must be integrated, coordinated and completed safely and efficiently by multiple crafts and work groups. As a result, numerous productivity factors can influence the cost and schedule of outage completion. This provides owners, contractors and labor with unique opportunities for competitive advantage--by making radical changes in how they manage labor-hours and time.

  1. Defining resilience within a risk-informed assessment framework

    SciTech Connect (OSTI)

    Coles, Garill A.; Unwin, Stephen D.; Holter, Gregory M.; Bass, Robert B.; Dagle, Jeffery E.

    2011-08-01

    The concept of resilience is the subject of considerable discussion in academic, business, and governmental circles. The United States Department of Homeland Security for one has emphasised the need to consider resilience in safeguarding critical infrastructure and key resources. The concept of resilience is complex, multidimensional, and defined differently by different stakeholders. The authors contend that there is a benefit in moving from discussing resilience as an abstraction to defining resilience as a measurable characteristic of a system. This paper proposes defining resilience measures using elements of a traditional risk assessment framework to help clarify the concept of resilience and as a way to provide non-traditional risk information. The authors show various, diverse dimensions of resilience can be quantitatively defined in a common risk assessment framework based on the concept of loss of service. This allows the comparison of options for improving the resilience of infrastructure and presents a means to perform cost-benefit analysis. This paper discusses definitions and key aspects of resilience, presents equations for the risk of loss of infrastructure function that incorporate four key aspects of resilience that could prevent or mitigate that loss, describes proposed resilience factor definitions based on those risk impacts, and provides an example that illustrates how resilience factors would be calculated using a hypothetical scenario.

  2. Scope and verification of a Fissile Material (Cutoff) Treaty

    SciTech Connect (OSTI)

    Hippel, Frank N. von

    2014-05-09

    A Fissile Material Cutoff Treaty (FMCT) would ban the production of fissile material - in practice highly-enriched uranium and separated plutonium - for weapons. It has been supported by strong majorities in the United Nations. After it comes into force, newly produced fissile materials could only be produced under international - most likely International Atomic Energy Agency - monitoring. Many non-weapon states argue that the treaty should also place under safeguards pre-existing stocks of fissile material in civilian use or declared excess for weapons so as to make nuclear-weapons reductions irreversible. This paper discusses the scope of the FMCT, the ability to detect clandestine production and verification challenges in the nuclear-weapons states.

  3. Microsoft Word - FG2_scoping transcript_Jacksonville06092011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 3 4 5 6 7 8 9 FUTUREGEN 2.0 PROGRAM 10 PUBLIC SCOPING MEETING 11 12 13 JACKSONVILLE, ILLINOIS 14 15 16 JUNE 9, 2011 17 18 19 20 21 22 23 24 Page 2 1 I N D E X 2 MAIN SPEAKERS: PAGE 3 Cliff Whyte 5 4 Jeff Hoffmann 11 5 Mike Long 16 6 Ken Humphreys 20 7 Cliff Whyte 31 8 PUBLIC: 9 Brad Zeller 37 10 Kelly Hall 39 11 Andy Davenport 40/98 12 David Davenport 49 13 Jeffrey Niemann 56 14 Elizabeth Niemann 62 15 Richard Johnson 68 16 William Hawks 69 17 Catherine Edmiston 72 18 Patty Rykhus 77/101 19

  4. Air Quality Scoping Study for Rachel, Nevada (EMSI April 2007)

    SciTech Connect (OSTI)

    Engelbrecht, Johann; Kavouras, Ilias; Campbell, Dave; Campbell, Scott; Kohl, Steven; Shafer, David

    2007-04-01

    The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

  5. Air Quality Scoping Study for Beatty, Nevada (EMSI April 2007)

    SciTech Connect (OSTI)

    Engelbrecht, Johann; Kav, Ilias; Campbell, Dave; Campbell, Scott; Kohl, Steven; Shafer, David

    2007-04-01

    The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

  6. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  7. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  8. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  9. Cloudnet Project

    SciTech Connect (OSTI)

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  10. Project Reports for Rosebud Sioux Tribe- 2003 Project

    Broader source: Energy.gov [DOE]

    The Rosebud Sioux Tribe, located in Todd County in south-central South Dakota, installed a single 750-kW wind turbine that was dedicated in April 2003. While completing the design and financing of the single wind turbine, the tribe began defining a larger commercial opportunity — a 30-MW wind energy project for energy export into the larger electricity market. The project to be funded under this grant is the preconstruction development activities for a 30-MW commercial wind facility to provide economic benefits to the tribe and create jobs for tribal members.

  11. Exe-Guard Project

    SciTech Connect (OSTI)

    Smith, Rhett; Marshall, Tim; Chavez, Adrian; Bratus, Sergey

    2015-12-26

    compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

  12. Commercial production and distribution of fresh fruits and vegetables: A scoping study on the importance of produce pathways to dose

    SciTech Connect (OSTI)

    Marsh, T.L.; Anderson, D.M.; Farris, W.T.; Ikenberry, T.A.; Napier, B.A.; Wilfert, G.L.

    1992-09-01

    This letter report summarizes a scoping study that examined the potential importance of fresh fruit and vegetable pathways to dose. A simple production index was constructed with data collected from the Washington State Department of Agriculture (WSDA), the United States Bureau of the Census, and the United States Department of Agriculture (USDA). Hanford Environmental Dose Reconstruction (HEDR) Project staff from Battelle, Pacific Northwest Laboratories, in cooperation with members of the Technical Steering Panel (TSP), selected lettuce and spinach as the produce pathways most likely to impact dose. County agricultural reports published in 1956 provided historical descriptions of the predominant distribution patterns of fresh lettuce and spinach from production regions to local population centers. Pathway rankings and screening dose estimates were calculated for specific populations living in selected locations within the HEDR study area.

  13. Project Narrative

    SciTech Connect (OSTI)

    Driscoll, Mary C.

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  14. Rosebud Sioux Tribe- 2003 Project

    Broader source: Energy.gov [DOE]

    The Rosebud Sioux Tribe, located in Todd County in south-central South Dakota, installed a single 750-kW wind turbine that was dedicated in April 2003. While completing the design and financing of the single wind turbine, the tribe began defining a larger commercial opportunity — a 30-MW wind energy project for energy export into the larger electricity market. The project to be funded under this grant is the preconstruction development activities for a 30-MW commercial wind facility to provide economic benefits to the tribe and create jobs for tribal members.

  15. Advanced engineering environment pilot project.

    SciTech Connect (OSTI)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solution to deploy the AEE across the NWC.

  16. SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS The Department of Energy (DOE) has a longstanding interest in the retention and well- being of the workforce employed by its management and operating (M&O) and other significant contractors, which today include nuclear, laboratory, and environmental clean-up contractors. Much of the work performed by employees under M&O and other significant contracts initially required and continues to require highly specialized

  17. Open Transport Switch A Software Defined Networking Architecture

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Transport Switch - A Software Defined Networking Architecture for Transport Networks Abhinava Sadasivarao * Sharfuddin Syed * Ping Pan * Chris Liou * Andrew Lake † Chin Guok † Inder Monga † * Infinera Corporation † Energy Sciences Network Sunnyvale, CA 94089 Berkeley, CA 94720 {asadasivarao, ssyed, ppan, cliou}@infinera.com {andy, chin, inder}@es.net ABSTRACT There have been a lot of proposals to unify the control and management of packet and circuit networks but none have been

  18. Defining Human Failure Events for Petroleum Risk Analysis

    SciTech Connect (OSTI)

    Ronald L. Boring; Knut Øien

    2014-06-01

    In this paper, an identification and description of barriers and human failure events (HFEs) for human reliability analysis (HRA) is performed. The barriers, called target systems, are identified from risk significant accident scenarios represented as defined situations of hazard and accident (DSHAs). This report serves as the foundation for further work to develop petroleum HFEs compatible with the SPAR-H method and intended for reuse in future HRAs.

  19. Report of workshop on radiological effects of nuclear war, SCOPE-ENUWAR workshop, Moscow, USSR, March 21-25, 1988

    SciTech Connect (OSTI)

    Shapiro, C.S.

    1988-03-01

    The workshop on radiological consequences of nuclear war addressed specific issues that built on the foundation of the results that were published in the SCOPE-ENUWAR report (SCOPE-28) in 1986. 14 refs.

  20. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  1. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  2. Tank Waste Project Quality Assurance Program Plan. Revision 1

    SciTech Connect (OSTI)

    Clayton, R.E.

    1994-11-20

    This plan describes all the Quality Assurance Program elements required by DOE Order 5700.6C. The elements shall be applied as applicable to specific Tank Waste Projects. A project-specific QAPP shall be issued as a supporting document which shall be used in conjunction with this QAPP. The project specific QAPP shall describe or define any special information, instructions or requirements.

  3. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect (OSTI)

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  4. Microsoft Word - XX 13 Public scoping Walla Walla Basin Spring...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    existing adult holding and spawning facility on the South Fork Walla Walla River near Milton-Freewater in Umatilla County, Ore. This is the latest project in an ongoing...

  5. Hydropower Projects

    SciTech Connect (OSTI)

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  6. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT SUMMARY 1 TITLE Advancing Synchrophasor Applications and Training through Academic-Industry Collaborations 2 PRINCIPLE INVESTIGATORS University of Wyoming: Dongliang Duan (PI), John Pierre, Suresh Muknahallipatna (co-PIs) Colorado State University: Liuqing Yang, Louis L. Scharf (co-PIs) Montana Tech of the University of Montana: Daniel Trudnowski, Matthew Donnelly (co-PIs) 3 CONTACT INFORMATION Dongliang Duan Dept. 3295, 1000 E. University Ave. Laramie, WY 82070 Tel: (307)766-6541; Fax:

  7. Scoping analysis of toxic metal performance in DOE low-level waste disposal facilities

    SciTech Connect (OSTI)

    Waters, R.D; Bougai, D.A.; Pohl, P.I.

    1996-03-01

    This study provides a scoping safety assessment for disposal of toxic metals contained in Department of Energy (DOE) mixed low-level waste (MLLW) at six DOE sites that currently have low-level waste (LLW) disposal facilities--Savannah River Site, Oak Ridge Reservation, Los Alamos National Laboratory, Hanford Reservation, Nevada Test Site, and Idaho National Engineering Laboratory. The study has focused on the groundwater contaminant pathway, which is considered to be the dominant human exposure pathway from shallow land MLLW disposal. A simple and conservative transport analysis has been performed using site hydrological data to calculate site-specific ``permissible`` concentrations of toxic metals in grout-immobilized waste. These concentrations are calculated such that, when toxic metals are leached from the disposal facility by infiltrating water and attenuated in local ground-water system the toxic metal concentrations in groundwater below the disposal facility do not exceed the Maximum Contaminant Levels as stated in the National Primary Drinking Water Regulation. The analysis shows that and sites allow about I00 times higher toxic metal concentrations in stabilized waste leachate than humid sites. From the limited available data on toxic metal concentrations in DOE MLLW, a margin of protection appears to exist in most cases when stabilized wastes containing toxic metals are disposed of at the DOE sites under analysis. Possible exceptions to this conclusion are arsenic, chromium selenium, and mercury when disposed of at some humid sites such as the Oak Ridge Reservation. This analysis also demonstrates that the US Environmental Protection Agency`s prescriptive regulatory approach that defines rigid waste treatment standards does not inherently account for the variety of disposal environments encountered nationwide and may result in either underprotection of groundwater resources (at humid sites) or an excessive margin of protection (at and sites).

  8. PROJECT MANGEMENT PLAN EXAMPLES Project Organization Examples

    Office of Environmental Management (EM)

    Organization Examples Example 8 4.0 PROJECT ORGANIZATION Chapter 4.0 describes the principle project organizations, including their responsibilities and relationships. Other organizations, that have an interest in the project, also are described. 4.1 Principal Project Organizations and Responsibilities The management organization for the 324/327 Buildings Stabilization/Deactivation Project represents a partnership between four principal project organizations responsible for the project. The four

  9. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect (OSTI)

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  10. MHK Projects/Manchac Point Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  11. MHK Projects/Claiborne Island Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  12. MHK Projects/Point Pleasant Project | Open Energy Information

    Open Energy Info (EERE)

    el":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St Gabriel, LA Project StateProvince Louisiana Project Country United States Project Resource...

  13. MHK Projects/College Point Project | Open Energy Information

    Open Energy Info (EERE)

    bel":"","visitedicon":"" Project Profile Project Start Date 112008 Project City St James, LA Project StateProvince Louisiana Project Country United States Project Resource...

  14. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect (OSTI)

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  15. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    SciTech Connect (OSTI)

    SKELLY, W.A.

    1999-10-06

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration.

  16. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  17. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    SciTech Connect (OSTI)

    Gelles, C. M.; Sheppard, F. R.

    2002-02-26

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program.

  18. Project and Survey Staff (HC-50.1) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The Project and Survey Staff (HC-50.1) report to the Office of Human Capital Strategy, ... the Department to define and design Human Capital Management (HCM) implementation ...

  19. Final Technical Report for the Neutron Detection without Helium-3 Project

    SciTech Connect (OSTI)

    Ely, James H.; Bliss, Mary; Kouzes, Richard T.; Lintereur, Azaree T.; Robinson, Sean M.; Siciliano, Edward R.; Swinhoe, Martyn T.; Woodring, Mitchell L.

    2013-11-01

    This report details the results of the research and development work accomplished for the ‘Neutron Detection without Helium-3’ project conducted during the 2011-2013 fiscal years. The primary focus of the project was to investigate commercially available technologies that might be used in safeguards applications in the relatively near term. Other technologies that are being developed may be more applicable in the future, but were outside the scope of this study.

  20. Modeling and Simulation Optimization and Feasibility Studies for the Neutron Detection without Helium-3 Project

    SciTech Connect (OSTI)

    Ely, James H.; Siciliano, Edward R.; Swinhoe, Martyn T.; Lintereur, Azaree T.

    2013-01-01

    This report details the results of the modeling and simulation work accomplished for the ‘Neutron Detection without Helium-3’ project during the 2011 and 2012 fiscal years. The primary focus of the project is to investigate commercially available technologies that might be used in safeguards applications in the relatively near term. Other technologies that are being developed may be more applicable in the future, but are outside the scope of this study.

  1. Guidance on the Term ProjectŽ Under the Recovery Act Buy American Provisions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GUIDANCE ON THE TERM "PROJECT" UNDER THE RECOVERY ACT BUY AMERICAN PROVISIONS EFFECTIVE DATE: JUNE 18, 2010 SUBJECT: GUIDANCE FOR RECIPIENTS OF RECOVERY ACT FINANCIAL ASSISTANCE FROM THE OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY ON THE TERM "PROJECT" UNDER THE RECOVERY ACT BUY AMERICAN PROVISIONS SCOPE: This guidance applies to all state, local and tribal government recipients and sub-recipients (grantees and subgrantees) of Recovery Act financial assistance from the

  2. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  3. Conceptual design report for tank farm restoration and safe operations, project W-314

    SciTech Connect (OSTI)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  4. 2015-04 "Fiscal Year 2017 Project Prioritization" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 "Fiscal Year 2017 Project Prioritization" 2015-04 "Fiscal Year 2017 Project Prioritization" It is the intent of the of this recommendation that the NNMCAB have input into developing the budget priorities for FY 2017, in order to assist in the completion of clean up scope on the CO requirements. Rec 2015-04 - May 20, 2015 (498.92

  5. Scoping Analysis of Source Term and Functional Containment Attenuation Factors

    SciTech Connect (OSTI)

    Pete Lowry

    2012-10-01

    In order to meet future regulatory requirements, the Next Generation Nuclear Plant (NGNP) Project must fully establish and validate the mechanistic modular high temperature gas-cooled reactor (HTGR) source term. This is not possible at this stage in the project, as significant uncertainties in the final design remain unresolved. In the interim, however, there is a need to establish an approximate characterization of the source term. The NGNP team developed a simplified parametric model to establish mechanistic source term estimates for a set of proposed HTGR configurations.

  6. Scoping Analysis of Source Term and Functional Containment Attenuation Factors

    SciTech Connect (OSTI)

    Pete Lowry

    2012-02-01

    In order to meet future regulatory requirements, the Next Generation Nuclear Plant (NGNP) Project must fully establish and validate the mechanistic modular high temperature gas-cooled reactor (HTGR) source term. This is not possible at this stage in the project, as significant uncertainties in the final design remain unresolved. In the interim, however, there is a need to establish an approximate characterization of the source term. The NGNP team developed a simplified parametric model to establish mechanistic source term estimates for a set of proposed HTGR configurations.

  7. Scoping Analysis of Source Term and Functional Containment Attenuation Factors

    SciTech Connect (OSTI)

    Pete Lowry

    2012-01-01

    In order to meet future regulatory requirements, the Next Generation Nuclear Plant (NGNP) Project must fully establish and validate the mechanistic modular high temperature gas-cooled reactor (HTGR) source term. This is not possible at this stage in the project, as significant uncertainties in the final design remain unresolved. In the interim, however, there is a need to establish an approximate characterization of the source term. The NGNP team developed a simplified parametric model to establish mechanistic source term estimates for a set of proposed HTGR configurations.

  8. PORTNUS Project

    SciTech Connect (OSTI)

    Loyal, Rebecca E.

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  9. Microsoft PowerPoint - 2_FG2 scoping_DOE demonstration program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FutureGen 2.0 Jeff Hoffmann U.S. Department of Energy, Office of Major Demonstrations National Environmental Policy Act Public Scoping Meetings June 7-9, 2011 2 What is FutureGen ...

  10. Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings

    SciTech Connect (OSTI)

    none,

    2011-06-01

    Presents the results of a scoping study to assess the need for national databases that can support best practices in energy efficiency program evaluation, measurement, and verification (EM&V).

  11. Budget Period 2 Summary Report Part 3: Hywind Maine Project

    SciTech Connect (OSTI)

    Driscoll, Frederick; Platt, Andrew; Sirnivas, Senu

    2015-08-15

    This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data

  12. Resilient Control Systems Practical Metrics Basis for Defining Mission Impact

    SciTech Connect (OSTI)

    Craig G. Rieger

    2014-08-01

    "Resilience” describes how systems operate at an acceptable level of normalcy despite disturbances or threats. In this paper we first consider the cognitive, cyber-physical interdependencies inherent in critical infrastructure systems and how resilience differs from reliability to mitigate these risks. Terminology and metrics basis are provided to integrate the cognitive, cyber-physical aspects that should be considered when defining solutions for resilience. A practical approach is taken to roll this metrics basis up to system integrity and business case metrics that establish “proper operation” and “impact.” A notional chemical processing plant is the use case for demonstrating how the system integrity metrics can be applied to establish performance, and

  13. Recombination of polynucleotide sequences using random or defined primers

    DOE Patents [OSTI]

    Arnold, Frances H.; Shao, Zhixin; Affholter, Joseph A.; Zhao, Huimin; Giver, Lorraine J.

    2001-01-01

    A method for in vitro mutagenesis and recombination of polynucleotide sequences based on polymerase-catalyzed extension of primer oligonucleotides is disclosed. The method involves priming template polynucleotide(s) with random-sequences or defined-sequence primers to generate a pool of short DNA fragments with a low level of point mutations. The DNA fragments are subjected to denaturization followed by annealing and further enzyme-catalyzed DNA polymerization. This procedure is repeated a sufficient number of times to produce full-length genes which comprise mutants of the original template polynucleotides. These genes can be further amplified by the polymerase chain reaction and cloned into a vector for expression of the encoded proteins.

  14. Recombination of polynucleotide sequences using random or defined primers

    DOE Patents [OSTI]

    Arnold, Frances H.; Shao, Zhixin; Affholter, Joseph A.; Zhao, Huimin H; Giver, Lorraine J.

    2000-01-01

    A method for in vitro mutagenesis and recombination of polynucleotide sequences based on polymerase-catalyzed extension of primer oligonucleotides is disclosed. The method involves priming template polynucleotide(s) with random-sequences or defined-sequence primers to generate a pool of short DNA fragments with a low level of point mutations. The DNA fragments are subjected to denaturization followed by annealing and further enzyme-catalyzed DNA polymerization. This procedure is repeated a sufficient number of times to produce full-length genes which comprise mutants of the original template polynucleotides. These genes can be further amplified by the polymerase chain reaction and cloned into a vector for expression of the encoded proteins.

  15. DOE Issues Request for Information for Scope Requirements Planning at Los

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alamos National Laboratory | Department of Energy Information for Scope Requirements Planning at Los Alamos National Laboratory DOE Issues Request for Information for Scope Requirements Planning at Los Alamos National Laboratory December 10, 2014 - 4:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Sources Sought/Request for

  16. Genome assortment, not serogroup, defines Vibrio cholerae pandemic strains

    SciTech Connect (OSTI)

    Brettin, Thomas S; Bruce, David C; Challacombe, Jean F; Detter, John C; Han, Cliff S; Munik, A C; Chertkov, Olga; Meincke, Linda; Saunders, Elizabeth; Choi, Seon Y; Haley, Bradd J; Taviani, Elisa; Jeon, Yoon - Seong; Kim, Dong Wook; Lee, Jae - Hak; Walters, Ronald A; Hug, Anwar; Colwell, Rita R

    2009-01-01

    Vibrio cholerae, the causative agent of cholera, is a bacterium autochthonous to the aquatic environment, and a serious public health threat. V. cholerae serogroup O1 is responsible for the previous two cholera pandemics, in which classical and El Tor biotypes were dominant in the 6th and the current 7th pandemics, respectively. Cholera researchers continually face newly emerging and re-emerging pathogenic clones carrying combinations of new serogroups as well as of phenotypic and genotypic properties. These genotype and phenotype changes have hampered control of the disease. Here we compare the complete genome sequences of 23 strains of V. cholerae isolated from a variety of sources and geographical locations over the past 98 years in an effort to elucidate the evolutionary mechanisms governing genetic diversity and genesis of new pathogenic clones. The genome-based phylogeny revealed 12 distinct V. cholerae phyletic lineages, of which one, designated the V. cholerae core genome (CG), comprises both O1 classical and EI Tor biotypes. All 7th pandemic clones share nearly identical gene content, i.e., the same genome backbone. The transition from 6th to 7th pandemic strains is defined here as a 'shift' between pathogenic clones belonging to the same O1 serogroup, but from significantly different phyletic lineages within the CG clade. In contrast, transition among clones during the present 7th pandemic period can be characterized as a 'drift' between clones, differentiated mainly by varying composition of laterally transferred genomic islands, resulting in emergence of variants, exemplified by V.cholerae serogroup O139 and V.cholerae O1 El Tor hybrid clones that produce cholera toxin of classical biotype. Based on the comprehensive comparative genomics presented in this study it is concluded that V. cholerae undergoes extensive genetic recombination via lateral gene transfer, and, therefore, genome assortment, not serogroup, should be used to define pathogenic V

  17. State/Local Government Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State/Local Government Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach documented in

  18. Oak Ridge completes field work on Recovery Act-projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Ridge completes field work on Recovery Act-projects Oak Ridge completes field work on Recovery Act-projects May 8, 2014 - 12:00pm Addthis The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes. "This is a landmark

  19. DOE Awards Contract for Idaho Clean-up Project (ICP) Core | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idaho Clean-up Project (ICP) Core DOE Awards Contract for Idaho Clean-up Project (ICP) Core February 4, 2016 - 6:15pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in

  20. Capital Project Prioritization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capital-Project-Prioritization Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  1. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  2. Preparing for Project Implementation Financing Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference Agenda Seminar Series ...

  3. Project Grandmaster

    SciTech Connect (OSTI)

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves in the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren?t already aware of or different groups of interest they might want to follow.

  4. Project Grandmaster

    Energy Science and Technology Software Center (OSTI)

    2013-09-16

    The purpose of the Project Grandmaster Application is to allow individuals to opt-in and give the application access to data sources about their activities on social media sites. The application will cross-reference these data sources to build up a picture of each individual activities they discuss, either at present or in the past, and place this picture in reference to groups of all participants. The goal is to allow an individual to place themselves inmore » the collective and to understand how their behavior patterns fit with the group and potentially find changes to make, such as activities they weren’t already aware of or different groups of interest they might want to follow.« less

  5. 2015-09-25 Capital Asset Project List.xls

    Broader source: Energy.gov (indexed) [DOE]

    as defined by DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. CD-0 Approve Mission Need CD-1 Approve Alternative Selection and Cost Range...

  6. Portsmouth Decommissioning and Decontamination Project Director's Final Findings and Order

    Broader source: Energy.gov [DOE]

    Portsmouth Decommissioning and Decontamination (D&D) Project Director's Final Findings and Order defines the steps for identifying a range of technical alternatives for the D&D and waste...

  7. Correlation of Theory and Function in Well-Defined Bimetallic Electrocatalysts - Final Report

    SciTech Connect (OSTI)

    Crooks, Richard M.

    2014-06-05

    The objective of this research proposal was to correlate the structure of nanoparticles that are comprised of ~100-200 atoms to their electrocatalytic function. This objective was based on the growing body of evidence suggesting that catalytic properties can be tailored through controlled synthesis of nanoparticles. What has been missing from many of these studies, and what we are contributing, is a model catalyst that is sufficiently small, structurally well-defined, and well-characterized that its function can be directly predicted by theory. Specifically, our work seeks to develop a fundamental and detailed understanding of the relationship between the structure of nanoscopic oxygen-reduction catalysts and their function. We assembled a team with expertise in theory, synthesis, and advanced characterization methods to address the primary objective of this project. We anticipated the outcomes of the study to be: (1) a better theoretical understanding of how nanoparticle structure affects catalytic properties; (2) the development of advanced, in-situ and ex-situ, atomic-scale characterization methods that are appropriate for particles containing about 100 atoms; and (3) improved synthetic methods that produce unique nanoparticle structures that can be used to test theoretical predictions. During the project period, we have made excellent progress on all three fronts.

  8. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & ...

  9. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  10. Magnetometry of micro-magnets with electrostatically defined Hall bars

    SciTech Connect (OSTI)

    Lachance-Quirion, Dany; Camirand Lemyre, Julien; Bergeron, Laurent; Sarra-Bournet, Christian; Pioro-Ladrière, Michel

    2015-11-30

    Micro-magnets are key components for quantum information processing with individual spins, enabling arbitrary rotations and addressability. In this work, characterization of sub-micrometer sized CoFe ferromagnets is performed with Hall bars electrostatically defined in a two-dimensional electron gas. Due to the ballistic nature of electron transport in the cross junction of the Hall bar, anomalies such as the quenched Hall effect appear near zero external magnetic field, thus hindering the sensitivity of the magnetometer to small magnetic fields. However, it is shown that the sensitivity of the diffusive limit can be almost completely restored at low temperatures using a large current density in the Hall bar of about 10 A/m. Overcoming the size limitation of conventional etched Hall bars with electrostatic gating enables the measurement of magnetization curves of 440 nm wide micro-magnets with a signal-to-noise ratio above 10{sup 3}. Furthermore, the inhomogeneity of the stray magnetic field created by the micro-magnets is directly measured using the gate-voltage-dependent width of the sensitive area of the Hall bar.

  11. Defining nuclear security in the 21st century

    SciTech Connect (OSTI)

    Doyle, James E

    2009-01-01

    A conference devoted to Reducing the Risks from Radioactive and Nuclear Materials presupposes that such risks exist. Few would disagree, but what are they? While debate on the nature and severity of risks associated with nuclear energy will always remain, it is easy to define a set of risks that are almost universally acknowledged. These include: (1) Nuclear warfare between states; (2) Continued proliferation of nuclear weapons and weapons-grade nuclear materials to states and non-state actors; (3) Terrorists or non-state actor acquisition or use nuclear weapons or nuclear materials; (4) Terrorists or non-state actors attack on a nuclear facility; and (5) Loss or diversion of nuclear weapons or materials by a state to unauthorized uses. These are listed in no particular order of likelihood or potential consequence. They are also very broadly stated, each one could be broken down into a more detailed set of discrete risks or threats. The fact that there is a strong consensus on the existence of these risks is evidence that we remain in an era of nuclear insecurity. This becomes even clearer when we note that most major trends influencing the probability of these risks continue to run in a negative direction.

  12. Western Interconnection Synchrophasor Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Demonstration Project Western Interconnection Synchrophasor Project Resources & Links Demand Response Energy Efficiency Emerging Technologies Synchrophasor measurements are a...

  13. Demonstration project Smart Charging (Smart Grid Project) | Open...

    Open Energy Info (EERE)

    Smart Grid Projects Smart Grid Projects in Europe Smart Grid Projects - Grid Automation Distribution Smart Grid Projects - Integrated System Smart Grid Projects - Home...

  14. 2016 DOE Project Management Workshop - "Enhancing Project Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 DOE Project Management Workshop - "Enhancing Project Management" 2016 DOE Project Management Workshop - "Enhancing Project Management" 20160407-doe-project-management-workshop-AD...

  15. MHK Projects/Admirality Inlet Tidal Energy Project | Open Energy...

    Open Energy Info (EERE)

    eLabel":"","visitedicon":"" Project Profile Project Start Date 112006 Project City Port Townsend, WA Project StateProvince Washington Project Country United States...

  16. Implementing Systems Engineering on a CERCLA Project

    SciTech Connect (OSTI)

    G. A. Beitel

    1999-06-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), enacted in 1980, provides a regulatory and legal mechanism to reduce risks from prior disposal of hazardous and toxic chemicals. Regulations, Standards, and Guidelines have been published to further define the CERCLA Process. The OU 7-10 Staged Interim Action Project at the Idaho National Engineering and Environmental Laboratory (INEEL) is a CERCLA project working to remediate the pre-1970 disposal pit in which transuranic materials have been disposed. This paper analyzes the CERCLA process from a systems engineering perspective and describes how systems engineering is implemented on this project.

  17. System Assessment Standards: Defining the Market for Industrial Energy Assessments

    SciTech Connect (OSTI)

    Sheaffer, Paul; McKane, Aimee; Tutterow, Vestal; Crane, Ryan

    2009-08-01

    Improved efficiency of industrial systems (e.g., compressed air or steam) contributes to a manufacturing facility?s bottom line, improves reliability, and better utilizes assets. Despite these advantages, many industrial facilities continue to have unrealized system optimization potential. A barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services, creating problems for both service providers in establishing market value for their services and for consumers in determining the relative quality of these system assessment services. On August 19, 2008, the American Society of Mechanical Engineers (ASME) issued four new draft Standards for trial use that are designed to raise the bar and define the market for these services. These draft Standards set the requirements for conducting an energy assessment at an industrial facility for four different system types: compressed air, process heating, pumping, and steam. The Standards address topics such as organizing and conducting assessments; analyzing the data collected; and reporting and documentation. This paper addresses both the issues and challenges in developing the Standards and the accompanying Guidance Documents, as well as the result of field testing by industrial facilities, consultants, and utilities during the trial use period that ended in January, 2009. These Standards will be revised and released by ASME for public review, and subsequently submitted for approval as American National Standards for publication in late 2009. Plans for a related activity to establish a professional-level program to certify practitioners in the area of system assessments, opportunities to integrate the ASME Standards with related work on industrial energy efficiency, as well as plans to expand the system assessment Standard portfolio are also discussed.

  18. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    SciTech Connect (OSTI)

    Hsu, R.H.; Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  19. Integrated Biorefinery Project: Cooperative Research and Development Final Report, CRADA Number CRD-10-390

    SciTech Connect (OSTI)

    Chapeaux, A.; Schell, D.

    2013-06-01

    The Amyris-NREL CRADA is a sub-project of Amyris?s DOE-funded pilot-scale Integrated Biorefinery (IBR). The primary product of the Amyris IBR is Amyris Renewable Diesel. Secondary products will include lubricants, polymers and other petro-chemical substitutes. Amyris and its project partners will execute on a rapid project to integrate and leverage their collective expertise to enable the conversion of high-impact biomass feedstocks to these advanced, infrastructure-compatible products. The scope of the Amyris-NREL CRADA includes the laboratory development and pilot scale-up of bagasse pretreatment and enzymatic saccharification conditions by NREL for subsequent conversion of lignocellulosic sugar streams to Amyris Diesel and chemical products by Amyris. The CRADA scope also includes a techno-economic analysis of the overall production process of Amyris products from high-impact biomass feedstocks.

  20. National Ignition Facility project acquisition plan

    SciTech Connect (OSTI)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  1. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  2. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    SciTech Connect (OSTI)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  3. Geothermal Energy Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy Projects Geothermal Energy ...

  4. Solar Manufacturing Projects | Department of Energy

    Office of Environmental Management (EM)

    Solar Manufacturing Projects Solar Manufacturing Projects Solar Manufacturing Projects Solar Manufacturing Projects Solar Manufacturing Projects Solar Manufacturing Projects SOLAR ...

  5. Step 3: Project Refinement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  6. Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is the appendices to the Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings document.

  7. Can standard sequential extraction determinations effectively define heavy metal species in superfund site soils?

    SciTech Connect (OSTI)

    Dahlin, Cheryl L.; Williamson, Connie A.; Collins, Wesley K.; Dahlin, David C.

    2001-01-01

    Speciation and distribution of heavy metals in soils controls the degree to which metals and their compounds are mobile, extractable, and plant-available. Consequently, speciation impacts the success of remediation efforts both by defining the relationship of the contaminants with their environment and by guiding development and evaluation of workable remediation strategies. The U.S. Department of Energy, Albany Research Center (Albany, OR), under a two-year interagency project with the U.S. Environmental Protection Agency (EPA), examined the suitability of sequential extraction as a definitive means to determine species of heavy metals in soil samples. Representative soil samples, contaminated with lead, arsenic, and/or chromium, were collected by EPA personnel from two Superfund sites, the National Lead Company site in Pedricktown, NJ, and the Roebling Steel, Inc., site in Florence, NJ. Data derived from Tessier=s standard three-stage sequential-extraction procedure were compared to data from a comprehensive characterization study that combined optical- and scanning-electron microscopy (with energy-dispersive x-ray and wavelength-dispersive x-ray analyses), x-ray diffraction, and chemical analyses. The results show that standard sequential-extraction procedures that were developed for characterizing species of contaminants in river sediments may be unsuitable for sole evaluation of contaminant species in industrial-site materials (particularly those that contain larger particles of the contaminants, encapsulated contaminants, and/or man-made materials such as slags, metals, and plastics). However, each sequential extraction or comprehensive characterization procedure has it=s own strengths and weaknesses. Findings of this study indicate that the use of both approaches, during the early stages of site studies, would be a best practice. The investigation also highlights the fact that an effective speciation study does not simply identify metal contaminants as

  8. CO2 CAPTURE PROJECT-AN INTEGRATED, COLLABORATIVE TECHNOLOGY DEVELOPMENT PROJECT FOR NEXT GENERATION CO2 SEPARATION, CAPTURE AND GEOLOGIC SEQUESTRATION

    SciTech Connect (OSTI)

    Helen Kerr

    2004-04-01

    The CO{sub 2} Capture Project (CCP) is a joint industry project, funded by eight energy companies (BP, ChevronTexaco, EnCana, Eni, Norsk Hydro, Shell, Statoil, and Suncor) and three government agencies (European Union (DG Res & DG Tren), Norway (Klimatek) and the U.S.A. (Department of Energy)). The project objective is to develop new technologies, which could reduce the cost of CO{sub 2} capture and geologic storage by 50% for retrofit to existing plants and 75% for new-build plants. Technologies are to be developed to ''proof of concept'' stage by the end of 2003. The project budget is approximately $24 million over 3 years and the work program is divided into eight major activity areas: (1) Baseline Design and Cost Estimation--defined the uncontrolled emissions from each facility and estimate the cost of abatement in $/tonne CO{sub 2}. (2) Capture Technology, Post Combustion--technologies, which can remove CO{sub 2} from exhaust gases after combustion. (3) Capture Technology, Oxyfuel--where oxygen is separated from the air and then burned with hydrocarbons to produce an exhaust with wet high concentrations of CO{sub 2} for storage. (4) Capture Technology, Pre-Combustion--in which, natural gas and petroleum coke are converted to hydrogen and CO{sub 2} in a reformer/gasifier. (5) Common Economic Model/Technology Screening--analysis and evaluation of each technology applied to the scenarios to provide meaningful and consistent comparison. (6) New Technology Cost Estimation: on a consistent basis with the baseline above, to demonstrate cost reductions. (7) Geologic Storage, Monitoring and Verification (SMV)--providing assurance that CO{sub 2} can be safely stored in geologic formations over the long term. (8) Non-Technical: project management, communication of results and a review of current policies and incentives governing CO{sub 2} capture and storage. Technology development work dominated the past six months of the project. Numerous studies have completed their

  9. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  10. Single-shell tank interim stabilization project plan

    SciTech Connect (OSTI)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  11. Single Shell Tank (SST) Interim Stabilization Project Plan

    SciTech Connect (OSTI)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  12. Defining the Molecular-Cellular-Field Continuum of Mercury Detoxification

    SciTech Connect (OSTI)

    Miller, Susan M.

    2014-09-04

    Hg is of special interest to DOE due to past use at the Oak Ridge Reservation (ORR). Its facile redox [Hg2+/0] chemistry, bonding to carbon [e.g. MeHg+] and unique physical properties [e.g., Hg0 volatility] underlie a complex global Hg cycle involving biotic and abiotic chemical and physical transport and transformations in soils, sediments, waterways and the atmosphere. Facultative and anaerobic bacteria make MeHg+, which is neurotoxic to wildlife and humans. Sustainable stewardship requires eliminating both MeHg+ and even more toxic Hg2+, which is also the substrate for methylation. The proteins encoded by the mer locus in aerobic and facultative mercury resistant (HgR) bacteria convert soil or waterborne Hg2+ or MeHg+ to less toxic, gaseous Hg0. HgR microbes live in highly Hg-contaminated sites and depress MeHg+ formation >500-fold in such zones. So, enhancing the capacity of natural HgR microbes to remove Hg2+/MeHg+ from wetlands and waterways is a logical component of contaminated site stewardship. To apply enhancement in the field requires knowing how the HgR pathway works including the metabolic demands it makes on the cell, i.e., the entire cell is the relevant catalytic unit. HgR loci occur in metabolically diverse bacteria and unique mer-host co-evolution has been found. In this project we extended our previous studies of mer enzymes in ?-proteobacteria, which are abundant in high Hg areas of the ORR to include studies of mer enzymes from HgR ?-proteobacteria and HgR actinobacteria, which also increase in the high Hg regions of the ORR. Specifically, we (1) examined interactions between structural compoenents of MerA and MerB enzymes from ?-proteobacteria, (2) investigated effects of mutations on kinetic efficiency of Hg2+ reduction by ?-proteobacterial MerA, (3) cloned and performed initital characterization of MerA and MerB enzymes from Streptomyces lividans, an actinobacterium, (4) cloned and performed initial characterization of a fused Mer

  13. Fourier heat conduction as a phenomenon described within the scope of the second law

    SciTech Connect (OSTI)

    Jesudason, Christopher G.

    2014-12-10

    unfortunately linked to mechanical reversibility, that has discouraged such an association. The modeling is based on an application of a 'recoverable transition', defined and developed earlier on ideas derived from thermal desorption of particles from a surface where the Fourier heat conduction process is approximated as a series of such desorption processes. We recall that the original Carnot engine required both adiabatic and isothermal steps to complete the zero entropy cycle, and this construct lead to the consequent deduction that any Second law statement that refers to heat-work conversion processes are only globally relevant. Here, on the other hand, we examine Fourier heat conduction from MD simulation and model this process as a zero-entropy forward scattering process relative to each of the atoms in the lattice chain being treated as a system where the Carnot cycle can be applied individually. The equations developed predicts the 'work' done to be equal to the energy transfer rate. The MD simulations conducted shows excellent agreement with the theory. Such views and results as these, if developed to a successful conclusion could imply that the Carnot cycle be viewed as describing a local process of energy-work conversion and that irreversible local processes might be brought within the scope of this cycle, implying a unified treatment of thermodynamically (i) irreversible, (ii) reversible, (iii) isothermal and (iv) adiabatic processes.

  14. Project Reports for Chickasaw Nation- 2010 Project

    Broader source: Energy.gov [DOE]

    Under this project, the Chickasaw Nation, Division of Commerce (CNDC) will upgrade old, inefficient lighting systems throughout CNDC to new, energy saving systems. Learn more about this project or...

  15. Project Reports for Haida Corporation- 2010 Project

    Broader source: Energy.gov [DOE]

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  16. RP-5 Renewable Energy Efficiency Project

    SciTech Connect (OSTI)

    Neil Clifton; Eliza Jane Whitman; Jamal A. Zughbi

    2003-07-28

    This is the fourth quarterly technical report for the RP-5 Renewable Energy Efficiency Project. The report summarizes the work progress, effort and activities that took place during the period of April 1, 2003 to June 30, 2003. However, IEUA is preparing a Supplemental report that will be mailed to the Department of Energy (DOE) by August 1, 2003, that provides additional information regarding IEUA's plan to expedite certain project activities. The report has been prepared in accordance with the Department of Energy (DOE) Guidelines. This technical report covers all meetings, discussions, and engineering and design activities that took place to finalize the project scope of work and complete the Request for Proposal (RFP) for the RP-5 Renewable Energy Efficiency Project. IEUA has decided to invite three more consulting engineering firms besides CH2M Hill, the Public Interest Energy Research (PIER) Consultant, to submit proposals for the design of the energy efficiency project. The proposals are currently in the evaluation phase and a decision is expected by the end of July. IEUA moved to its new headquarters building on June 13, 2003. The central plant is the system that supplies cooling and heating water to the headquarters building, and it primarily consists of equipment listed in the cooperative agreement under ''Chiller and Heater''. The central plant equipment was successfully installed and started. Other activities include gas analysis of three sources of low quality digester gas and foul air which could be used as fuel for an innovative flex microturbine. IEUA is also working with Stirling Energy Systems to determine if the Agency should be a host site for their equipment for testing the engine's operation on digester and natural gas. A matching funds update is also included in the Results and Discussion section, which presents the work effort performed by the PIER Consultant and the associated costs that serve as matching funds for the RP-5 Project during

  17. Project Charter (MSA-143). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1986-07-01

    Public Law 95-604, ``The Uranium Mill Tailings Radiation Control Act of 1978`` as amended assigns to DOE, other Federal agencies, and involved States and Indian tribes, responsibilities for remedial actions at 22 inactive uranium mill tailings sites listed in the Act, and for any other sites designated by the Secretary prior to November 8, 1979. The objective of the UMTRA Project is to provide remedial action at the mill tailings sites and associated vicinity properties in order to stabilize and control the tailings in a safe and environmentally sound manner and to eliminate potential health hazards caused by residual levels of uranium decay products that exceed EPA standards. A total of 24 uranium mill tailings sites. This Project Charter delineates the respective responsibilities and authorities of (The Office of Nuclear Energy) (NE) and (Albuquerque Operations Office) (AL), and defines the terms and conditions for management of the UMTRA Project. Supplementary Project management documents which have been and are being developed pursuant to this Charter include a Project Plan (PP), a Project Management Plan (PMP) and other plans governing the accomplishment of the Project mission Evolution of the program will require updates of the Project Plan and Project Management Plan.

  18. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 4: Project Implementation Presentation Agenda * Step 4: Project Implementation - Pre-construction - Contract execution - Interconnection - Project construction - Commissioning * Project Example 2 1/28/2016 2 1 Potential 3 Refinement 5 Operations & Maintenance 2 Options 4 Implementation 4 Implementation 3 Potential Options Refinement Implementation Operations & Maintenance Step 4: Implementation 4 Purpose: Contract and begin physical construction of project Tasks: * Finalize

  19. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Assessment of As-Is Grid by Non-Utility Stakeholders Introduction One goal of this grid modernization project is to assess the current status of the electric power grid in West Virginia in order to define the potential to implement smart grid technologies. Thus, an initial task of this project was to define the current state or "As-Is" grid in West Virginia. Financial and time constraints prohibited the

  20. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  1. EIS-0489: Notice of Comment Period Extension and Additional Scoping Meetings

    Broader source: Energy.gov [DOE]

    Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR)

  2. Framework for Project Development in the Renewable Energy Sector

    SciTech Connect (OSTI)

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  3. Guidelines for Home Energy Professionals Project Fact Sheet | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidelines for Home Energy Professionals Project Fact Sheet Guidelines for Home Energy Professionals Project Fact Sheet The U.S. Department of Energy and the home energy upgrade industry collaborate to define high-quality work and develop highly qualified workers. hep_project.pdf (692.47 KB) More Documents & Publications Home Energy Professional Certifications Fact Sheet Standard Work Specifications for Single-Family Home Energy Upgrades Summary Fact Sheet Weatherization and

  4. Statement of Project Objectives, EERE 303 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement of Project Objectives, EERE 303 Statement of Project Objectives, EERE 303 All of the information to be included in the SOPO must be consistent with the application and any negotiation strategies upon which the award was selected. Specifically, the SOPO must be consistent with the work plan portion of the technical volume submitted by the applicant. The SOPO should accurately define what work is to be done and the expected progress to be achieved. Statement of Project Objectives (415

  5. Project File System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with each project directory. This user must have a NIM role of PI, PI Proxy, or Project Manager. Access control for project directories is based on Unix groups. The...

  6. Project Charter Template

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE WebDigital Project Charter |Project Name|| |Project Lead|| |Supporting EERE Office... How do you plan to address Section 508 requirements? Do you need a separate Web statistics ...

  7. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable.

  8. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  9. Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Projects The U.S. Department of Energy supports a variety of energy-related projects on tribal lands. Through these projects, tribes have built the institutional capacity to manage their energy needs, assessed the feasibility of energy efficiency and renewable energy installation, and demonstrated the viability of installing renewable energy systems on tribal lands. View a map of projects Get information on project funding history Learn about Tribal Energy Deployment Program staff

  10. Perspectives on Project Finance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Finance July 29 2014 Project Company (Borrower) Off-take Agreements Feedstock Agreements O&M Agreement EPC Contract (construct) Technology License Agreements Sponsor's Equity Project Level Equity Investors Senior Project Debt Providers Equity Investors Typical Project Finance Structure 2 SOUND PROJECT ECONOMICS Leads to Adequate Debt Service Coverage And Acceptable Equity Returns Market Risk Assessment Competitive positioning. Supply / demand forecasts. Competing suppliers.

  11. Buckman Direct Diversion Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buckman Direct Diversion Project Buckman Direct Diversion Project This project takes surface water from the Rio Grande, and then treats and distributes these waters to the city and county of Santa Fe through their drinking water distribution systems. August 1, 2013 Water flumes at Buckman Direct Diversion Project Water flumes at Buckman Direct Diversion Project The City of Santa Fe and Santa Fe County completed the construction of the Buckman Direct Diversion (BDD) Project in December 2010. The

  12. NGNP Project 2011 Status and Path Forward

    SciTech Connect (OSTI)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  13. GTO Project Portfolio

    Broader source: Energy.gov [DOE]

    The Office funds 154 research and development projects leveraging nearly $500 million in total combined investment. Each project represents a growing technology sector in conventional hydrothermal,...

  14. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  15. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  16. Evaluation Project 4492

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Organization area to allow the movement and radio-graphing of component for evaluation to determine the proper Project Execution Plan for dismantlement. Evaluation Project...

  17. Manhattan Project: Places

    Office of Scientific and Technical Information (OSTI)

    Other Places Columbia University University of California, Berkeley The Dayton Project, 1943-1945 The Dayton Project, 1945 and Beyond Bomb Casing and Drop Test Sites Trinity Test ...

  18. Step 4: Project Implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... expected * Technology O&M Assumed low, mitigable or allocatable Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & ...

  19. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K Commercial Business Process Improvement (CBPI) Customer...

  20. DHS Flat Stanley Project

    Broader source: Energy.gov [DOE]

    To provide information on the DHS Flat Stanley Project. The goal of the project is to help kids learn about the importance of cybersecurity.

  1. ARRA Electrification Projects

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    U.S. Department of Energy funded multiple electrification projects through the American ... The U.S. Department of Energy funded multiple electrification projects through the ...

  2. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY ...

  3. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & ...

  4. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & ...

  5. 2016 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects FY 2016 Technology Innovation Project Briefs Demand Response TIP 292: Advanced Heat Pump Water Heater Research TIP 336: Scaled Deployment and Demonstration of Demand...

  6. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  7. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  9. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  11. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  12. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  13. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  14. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  15. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  16. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual ...

  17. Manhattan Project: Maps

    Office of Scientific and Technical Information (OSTI)

    Scroll down to view thumbnails of each map. Leslie Groves looks at a map of Japan. Manhattan Project: General Manhattan Project Facilities Places map "Signature Facilities of the ...

  18. The Manhattan Project

    Office of Scientific and Technical Information (OSTI)

    ... Center for Oak Ridge Oral History, including stories about the Manhattan Project The Manhattan Project: A New and Secret World of Human Experimentation Top Related Information: ...

  19. EIS-0230: Resource Contingency Program, Hermiston Power Project

    Broader source: Energy.gov [DOE]

    "The Bonneville Power Administration (BPA) prepared this environmental impact statement (EIS) to analyze the environmental impacts of implementing a Resource Contingency Program near Hermiston, Oregon, one of three proposed locations to carry out this program, which allows BPA to acquire power to supply to its customers if and when needed. In September 1993, BPA published a Notice of Intent to prepare an EIS on projects at three sites and in October 1993 held public scoping meetings at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. BPA concluded that publication of the final EIS should be separated into two documents, and presented the final analysis of the impacts of the other two sites in another document. This EIS addresses three proposed alternatives: the proposed action, no action, and other actions. The proposed action is the acquisition of power from both units optioned at the Hermiston Power Project Plant site (only if there is a need for power at a future date), or wheeling of power by BPA if another party acquires the output. This EIS addresses the environmental effects of constructing and operating both units under option for power delivery to BPA."

  20. Deep Well #4 Backup Power Systems Project Closeout Report

    SciTech Connect (OSTI)

    Jeremy Westwood

    2010-04-01

    The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

  1. MHK Projects/Twelve Mile Point Project | Open Energy Information

    Open Energy Info (EERE)

    Province Louisiana Project Country United States Project Resource Click here Current Tidal Coordinates 29.9177, -89.9307 Project Phase Phase 1 Project Installed Capacity...

  2. MHK Projects/Clarence Strait Tidal Energy Project | Open Energy...

    Open Energy Info (EERE)

    Project Country Australia Project Resource Click here Current Tidal Project Nearest Body of Water Clarence Strait Coordinates -12.083533792616, 131.04972839355 Project...

  3. Y-12 Steam Plant Project Received National Recognition for Project...

    National Nuclear Security Administration (NNSA)

    Steam Plant Project Received National Recognition for Project Management Excellence March 23, 2011 Y-12 steam plant project receives national recognition for project management ...

  4. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-04-19

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  5. Scoping assessment on medical isotope production at the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Scott, S.W.

    1997-08-29

    The Scoping Assessment addresses the need for medical isotope production and the capability of the Fast Flux Test Facility to provide such isotopes. Included in the discussion are types of isotopes used in radiopharmaceuticals, which types of cancers are targets, and in what way isotopes provide treatment and/or pain relief for patients.

  6. Ultra-efficient, Robust and Well-defined Nano-Array based Monolithic...

    Energy Savers [EERE]

    Ultra-efficient, Robust and Well-defined Nano-Array based Monolithic Catalysts Ultra-efficient, Robust and Well-defined Nano-Array based Monolithic Catalysts This presentation ...

  7. C.R.S. 40-1-103 - Public Utility Defined | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: C.R.S. 40-1-103 - Public Utility DefinedLegal Abstract This statute defines "public...

  8. Solar Energy Science Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Projects Curriculum: Solar Power -(thermodynamics, lightelectromagnetic, radiation, energy transformation, conductionconvection, seasons, trigonometry) Grade Level: ...

  9. Desert Peak EGS Project

    Broader source: Energy.gov [DOE]

    Desert Peak EGS Project presentation at the April 2013 peer review meeting held in Denver, Colorado.

  10. eProject Builder

    Energy Science and Technology Software Center (OSTI)

    2014-06-01

    eProject Builder enables Energy Services Companies (ESCOs) and their contracting agencies to: 1. upload and track project-level Information 2. generate basic project reports required by local, state, and/or federal agencies 3. benchmark new Energy Savings Performance Contract (ESPC) projects against historical data

  11. EM Projects Perspective

    Broader source: Energy.gov [DOE]

    Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management March 22, 2016

  12. Contract/Project Management

    Office of Environmental Management (EM)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  13. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  14. Project Reports for Winnebago Tribe- 2014 Project

    Broader source: Energy.gov [DOE]

    Following through with the Winnebago Tribe's commitment to reduce energy usage and consumption, the Winnebago Tribe Solar Project will focus on renewable energy production and energy cost savings...

  15. K…12 Schools Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    K-12 Schools Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach documented in Hopper et

  16. Camp Lejeune Solar Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lejeune Solar Project FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR Cincinnati, OH May 18, 2016 Camp Lejeune Solar  Duke Energy Overview  Project Overview  Project Background / Goals & Objectives  Timeline  Project Development  Partnership  Initial Development Steps  Project Background  Lessons Learned 2 Duke Energy Overview 3  Largest electric power holding company in the United States  150+ years of service  7.4 million electric customers and 525,000

  17. The multifamily building evaluation project

    SciTech Connect (OSTI)

    1995-03-01

    In 1991 the New York State Energy Office embarked on a comprehensive multi-year study of multifamily housing in New York City. The principal objective of the evaluation was to determine the degree to which new windows and boiler/burner retrofits installed in 22 multifamily buildings located in the New York City region save energy and whether the savings persist over a minimum of two years. Window and boiler retrofits were selected because they are popular measures and are frequently implemented with assistance from government and utility energy programs. Approaches prospectively, energy consumption monitoring and a series of on-site inspections helped explain why energy savings exceeded or fell short of expectations. In 1993, the scope of the evaluation expanded to include the monitoring of domestic hot water (DHW) consumption in order to better understand the sizing of combined heating/DHW boilers and water consumption patterns. The evaluation was one of ten proposals selected from over 100 candidates in a nationwide competition for a US Department of Energy Building Efficiency Program Grant. The Energy Office managed the project, analyzed the data and prepared the reports, Lawrence Berkeley Laboratory served as technical advisor, and EME Group (New York City) installed meters and dataloggers, collected data, and inspected the retrofits. The New York State Energy Research and Development Authority collaborated with the Energy Office on the DHW monitoring component. Results did not always follow predictable patterns. Some buildings far exceeded energy saving estimates while others experienced an increase in consumption. Persistence patterns were mixed. Some buildings showed a steady decline in energy savings while others demonstrated a continual improvement. A clear advantage of the research design was a frequent ability to explain results.

  18. Project Management Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Management Resources Project Management Resources Performance & Project Completion Environmental Management Completed Projects 2005-Present EM Current Project Performance ...

  19. EA-1971: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, announced its intent to prepare an EA to analyze the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in Jefferson County, Texas. In June 2014, FERC announced that due to changes in the project location and scope, it would prepare an EIS. See DOE/EIS-0501.

  20. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    SciTech Connect (OSTI)

    Earle, L.; Sparn, B.; Rutter, A.; Briggs, D.

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  1. Engineering report for project W-314 S/RID phase 1 assessment

    SciTech Connect (OSTI)

    FRIBERG, A.H.

    1999-05-24

    This report provides the results of an assessment of project W-314 compliance with project-specific SIRIDs. This Phase 1 assessment has been subdivided into the following tasks. Task 1 collected reference materials needed to complete the SIRID assessment. The documents include reports from the TWRS procedure compliance system (ERMI) that list the SIRID requirements for TWRS in each functional area and the documents that TWRS identified as implementing each SIRID (Phase 1 of the TWRS assessment). Also included are documents that were identified during this assessment as implementing project W-314 SIRIDs. Task 2 evaluated the 16 TWRS program SIRID functional areas to identify areas that applied specifically to project W-314. The SIRIDs applicable to project W-314 were determined by evaluating each individual SIRID in each functional area against the scope of project W-314 from inception to the point at which it begins operation. The following project W-314 functional areas were then prioritized into three groups to allocate resources to the most critical items. Priority 1 SIRID functional areas contain requirements that pertain to activities done completely within the scope of project W-314 (engineering, quality assurance, and construction). Task 3 consisted of an assessment of each functional area, in priority sequence, to further refine the set of SIRIDs that apply to project W-314. This task involved determining, for each SIRID requirement, a document used on the project that implemented the requirement. This is analogous to a Phase I assessment under the SIRID program but tailored specifically to project W-314. A matrix was developed to document the results. All the SIRIDs were found to have suitable implementing documents.

  2. Toward Semi-automated Assessment of Target Volume Delineation in Radiotherapy Trials: The SCOPE 1 Pretrial Test Case

    SciTech Connect (OSTI)

    Gwynne, Sarah; Spezi, Emiliano; Wills, Lucy; Nixon, Lisette; Hurt, Chris; Joseph, George; Evans, Mererid; Griffiths, Gareth; Crosby, Tom; Staffurth, John

    2012-11-15

    Purpose: To evaluate different conformity indices (CIs) for use in the analysis of outlining consistency within the pretrial quality assurance (Radiotherapy Trials Quality Assurance [RTTQA]) program of a multicenter chemoradiation trial of esophageal cancer and to make recommendations for their use in future trials. Methods and Materials: The National Cancer Research Institute SCOPE 1 trial is an ongoing Cancer Research UK-funded phase II/III randomized controlled trial of chemoradiation with capecitabine and cisplatin with or without cetuximab for esophageal cancer. The pretrial RTTQA program included a detailed radiotherapy protocol, an educational package, and a single mid-esophageal tumor test case that were sent to each investigator to outline. Investigator gross tumor volumes (GTVs) were received from 50 investigators in 34 UK centers, and CERR (Computational Environment for Radiotherapy Research) was used to perform an assessment of each investigator GTV against a predefined gold-standard GTV using different CIs. A new metric, the local conformity index (l-CI), that can localize areas of maximal discordance was developed. Results: The median Jaccard conformity index (JCI) was 0.69 (interquartile range, 0.62-0.70), with 14 of 50 investigators (28%) achieving a JCI of 0.7 or greater. The median geographical miss index was 0.09 (interquartile range, 0.06-0.16), and the mean discordance index was 0.27 (95% confidence interval, 0.25-0.30). The l-CI was highest in the middle section of the volume, where the tumor was bulky and more easily definable, and identified 4 slices where fewer than 20% of investigators achieved an l-CI of 0.7 or greater. Conclusions: The available CIs analyze different aspects of a gold standard-observer variation, with JCI being the most useful as a single metric. Additional information is provided by the l-CI and can focus the efforts of the RTTQA team in these areas, possibly leading to semi-automated outlining assessment.

  3. Defining the no action alternative for NEPA document of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1995-12-01

    Environmental professionals today must address many issues that might not have been foreseen by developers of the National Environmental Policy Act of 1969 (NEPA) or the President`s Council on Environmental Quality (CEQ) regulations for implementing NEPA. One issue is the definition of the no action alternative for NEPA documentation of continuing actions. The CEQ regulations do not define the no action alternative, but merely state that NEPA analyses shall {open_quotes}include the alternative of no action{close_quotes}. For NEPA analyses of newly proposed actions, the practical definition of the no action alternative is clear (i.e., the agency will not implement the proposed action or alternative actions). However, the practical definition for NEPA analyses of continuing actions is not so clear. To clarify the definition of the no action alternative for continuing actions, particularly those that involve agency decisions about relicensing existing projects or continuing to operate existing programs or facilities. In trying to clarify the definition of the no action alternative for continuing actions, this paper examines the function of the no action alternative for NEPA analyses in general. Pertinent issues include how the definition of the no action alternative affects the selection of the baseline for environmental analysis and whether inclusion of the no action alternative really forces agencies to consider no action as a realistic alternative. To address these issues, this paper begins with a discussion of relevant legal decisions involving the no action alternative in NEPA analyses. The paper then examines some agency NEPA regulations and recent NEPA documents to provide examples of how some agencies address the no action alternative for continuing actions. Finally, the paper suggests definitions of the no action alternative for continuing actions and methods for addressing no action as a realistic alternative.

  4. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    SciTech Connect (OSTI)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list.

  5. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    SciTech Connect (OSTI)

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  6. 2014 DOE Project Management Workshop

    Broader source: Energy.gov [DOE]

    What:  2014 DOE Project Management Workshop (Meeting the Challenge—Integrated Acquisition & Project Management)

  7. Microsoft PowerPoint - 1_FG2 scoping_DOE NEPA [Compatibility...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and DOE's Role - Jeff Hoffmann (DOE-NETL) Ameren Project Overview - Mike Long (Ameren) FG Alliance Project Overview - Gordon Beeman (June 7, 8) (FG Alliance) - Ken Humphreys...

  8. Contract/Project Management

    Office of Environmental Management (EM)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  9. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  10. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  11. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to

  12. Contract/Project Management

    Office of Environmental Management (EM)

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  13. Contract/Project Management

    Office of Environmental Management (EM)

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10).

  14. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Connor, M.D.

    1994-09-29

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover.

  15. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    SciTech Connect (OSTI)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.

  16. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project.

  17. Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership

    SciTech Connect (OSTI)

    Robert Lee; Reid Grigg; Brian McPherson

    2011-04-15

    Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.

  18. Seneca Compressed Air Energy Storage (CAES) Project

    SciTech Connect (OSTI)

    None, None

    2012-11-30

    of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for

  19. Salt repository project closeout status report

    SciTech Connect (OSTI)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

  20. Final report for the field-reversed configuration power plant critical-issue scoping study

    SciTech Connect (OSTI)

    Santarius, John F.; Mogahed, Elsayed A.; Emmert, Gilbert A.; Khater, Hesham Y.; Nguyen, Canh N.; Ryzhkov, Sergei V.; Stubna, Michael D.; Steinhauer, Loren C.; Miley, George H.

    2001-03-01

    This report describes research in which a team from the Universities of Wisconsin, Washington, and Illinois performed a scoping study of critical issues for field-reversed configuration (FRC) power plants. The key tasks for this research were (1) systems analysis of deuterium-tritium (D-T) FRC fusion power plants, and (2) conceptual design of the blanket and shield module for an FRC fusion core.

  1. Report Now Available: DC Microgrids Scoping Study--Estimate of Technical and Economic Benefits (March 2015)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Los Alamos National Laboratory has released a report titled DC Microgrids Scoping Study: Estimate of Technical and Economic Benefits, which presents the results of a study by several national labs and funded by the Office of Electricity Delivery & Energy Reliability. The study provides a preliminary examination of the benefits and drawbacks of potential DC microgrid applications relative to their AC counterparts, using several metrics for comparison, and offers recommendations for potential future research and deployment activities.

  2. Appendix A Scoping Input Appendix B Comments on Draft SWEA and Responses

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    68 December 2014 List of Appendices Appendix A Scoping Input Appendix B Comments on Draft SWEA and Responses Appendix C Summary of Federal Permits, Licenses, and Entitlements Appendix D Description of the South Platte Water Related Activities Program and the Platte River Recovery Implementation Program Appendix E Section 7 Consultation of the Endangered Species Act Correspondence with the U.S. Fish & Wildlife Service Appendix F Section 106 Consultation of the National Historic Preservation

  3. Concentrating Solar Power Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects Concentrating Solar Power Projects

  4. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  5. Haida Corporation- 2010 Project

    Broader source: Energy.gov [DOE]

    The Reynolds Creek Hydroelectric Project ("Reynolds Creek" or the "Project") is a 5 MW hydroelectric resource to be constructed on Prince of Wales Island, Alaska, approximately 10 miles east of Hydaburg.

  6. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  7. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Admin Chg 1, dated 1-16-2013, supersedes DOE O 415.1.

  8. Sample Project Execution Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  9. DOE Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Automotive Applications | Department of Energy Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive Applications DOE Materials-Based Hydrogen Storage Summit: Defining Pathways for Onboard Automotive Applications The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) hosted the DOE Materials-Based Hydrogen Storage Summit: Defining Pathways to Onboard Automotive Applications on January 27-28, 2015, in Golden, Colorado. The objectives of

  10. Sandia National Laboratories: Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Threat and Intelligence Insight Game-changing projects with a high degree of technical risk realized and produced in support of the warfighter Threat and Intelligence Insight Various Project Highlights IMS spearheads work supporting a number of prominent projects. Supporting the Department of Defense's core mission and ever-evolving needs, IMS leverages its robust background in weapons development to understand and actively engage with a number of weapons technologies, defense

  11. Red Lake Weatherization Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REVIEW RED LAKE WEATHERIZATION PROJECT BERT VAN WERT ENERGY ACTIVITIES COORDINATOR Project Overview To develop the capacity to conduct energy audits Implement energy efficiency measures into Tribal homes Develop a Tribally administered Energy Efficiency Program and business PROJECT LOCATION Our project is located at Red Lake Housing Authority Red Lake Band of Chippewa Indians Red Lake , MN Red Lake Band of Chippewas Area overview Reservation (Diminished Lands) and Surroundings Red Lake Band of

  12. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  13. Mentors and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentors, Projects Mentors and Projects Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational, collaborative atmosphere Contacts Director Misa Cowee Email Administrative Assistant Lynea Koshar Email Request more information Email Students work closely with their mentors, who are Laboratory scientists, on challenging research projects in the Space Weather Summer School. Projects are related to current research topics in space

  14. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  15. Step 2: Project Options

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Project Options 2 2 Design 1 Potential 3 Refinement 4 Implementation 2 Options 5 Operations & Maintenance 1/28/2016 2 Presentation Agenda * Step 2: Project Options * Project members and roles * Activity * Project ownership options - Interconnection, net metering, permitting, and considerations * Tools * Case in Point 3 Potential Options Refinement Implementation Operations & Maintenance 4 Step 2: Roles, Business Structures, & Regulatory Considerations Purpose: Determine ownership

  16. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    2013-07-09

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  17. Defining the regulatory options for the efficient provision of natural gas services

    SciTech Connect (OSTI)

    Timmerman, C.; Sutherland, R.J.

    1995-01-20

    This paper defines a few basic principles that are central to the regulation of natural gas distribution by local distribution companies in Maryland.

  18. CO2 Capture Project-An Integrated, Collaborative Technology Development Project for Next Generation CO2 Separation, Capture and Geologic Sequestration

    SciTech Connect (OSTI)

    Helen Kerr; Linda M. Curran

    2005-04-15

    The CO{sub 2} Capture Project (CCP) was a joint industry project, funded by eight energy companies (BP, ChevronTexaco, EnCana, ENI, Norsk Hydro, Shell, Statoil, and Suncor) and three government agencies (European Union [DG RES & DG TREN], the Norwegian Research Council [Klimatek Program] and the U.S. Department of Energy [NETL]). The project objective was to develop new technologies that could reduce the cost of CO{sub 2} capture and geologic storage by 50% for retrofit to existing plants and 75% for new-build plants. Technologies were to be developed to ''proof of concept'' stage by the end of 2003. Certain promising technology areas were increased in scope and the studies extended through 2004. The project budget was approximately $26.4 million over 4 years and the work program is divided into eight major activity areas: Baseline Design and Cost Estimation--defined the uncontrolled emissions from each facility and estimate the cost of abatement in $/tonne CO{sub 2}. Capture Technology, Post Combustion: technologies, which can remove CO{sub 2} from exhaust gases after combustion. Capture Technology, Oxyfuel: where oxygen is separated from the air and then burned with hydrocarbons to produce an exhaust with high CO{sub 2} for storage. Capture Technology, Pre-Combustion: in which, natural gas and petroleum cokes are converted to hydrogen and CO{sub 2} in a reformer/gasifier. Common Economic Model/Technology Screening: analysis and evaluation of each technology applied to the scenarios to provide meaningful and consistent comparison. New Technology Cost Estimation: on a consistent basis with the baseline above, to demonstrate cost reductions. Geologic Storage, Monitoring and Verification (SMV): providing assurance that CO{sub 2} can be safely stored in geologic formations over the long term. Non-Technical: project management, communication of results and a review of current policies and incentives governing CO{sub 2} capture and storage. Pre-combustion De

  19. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    SciTech Connect (OSTI)

    Cercy, M; Ronald Fayfich, R; Steven P Schneider, S

    2008-12-12

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.

  20. Technical Risk Rating of DOE Environmental Projects - 9153

    SciTech Connect (OSTI)

    Cercy, Michael; Fayfich, Ronald; Schneider, Steven

    2009-02-11

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects.