Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Decommissioning in the mature nuclear power industry  

SciTech Connect

Procedures for decommissioning a nuclear power plant or a spent fuel reprocessing plant are described. (DCC)

Anderson, F.H.; Slansky, C.M.

1975-01-01T23:59:59.000Z

2

DECOMMISSIONING OF NUCLEAR POWER REACTORS  

E-Print Network (OSTI)

Decommissioning means permanently removing a nuclear facility from service and reducing radioactive material on the licensed site to levels that would permit termination of the NRC license. On June 27, 1988, the NRC issued general requirements on decommissioning that contained technical and financial criteria and dealt with planning needs, timing, funding mechanisms, and environmental review

unknown authors

2000-01-01T23:59:59.000Z

3

Regulatory Process for Decommissioning Nuclear Power Reactors  

Science Conference Proceedings (OSTI)

The NRC revised decommissioning rule 10 CFR 50.82 in 1996 to make significant changes in the regulatory process for nuclear power plant licensees. This report provides a summary of ongoing federal agency and industry activities. It also describes the regulatory requirements applicable, or no longer applicable, to nuclear power plants at the time of permanent shutdown through the early decommissioning stage. The report describes the major components of a typical decommissioning plan, and provides industry...

1998-03-26T23:59:59.000Z

4

Updated Costs for Decommissioning Nuclear Power Facilities  

Science Conference Proceedings (OSTI)

This update of 1978 NRC cost estimates--in 1984 dollars--also estimates the costs of several special manpower and licensing options for decommissioning nuclear power facilities. The fully developed methodology offers utilities a sound basis on which to estimate the costs of decommissioning specific plants.

1985-05-13T23:59:59.000Z

5

Some aspects of the decommissioning of nuclear power plants  

SciTech Connect

The major factors influencing the choice of a national concept for the decommissioning of nuclear power plants are examined. The operating lifetimes of power generating units with nuclear reactors of various types (VVER-1000, VVER-440, RBMK-1000, EGP-6, and BN-600) are analyzed. The basic approaches to decommissioning Russian nuclear power plants and the treatment of radioactive waste and spent nuclear fuel are discussed. Major aspects of the ecological and radiation safety of personnel, surrounding populations, and the environment during decommissioning of nuclear installations are identified.

Khvostova, M. S., E-mail: marinakhvostova@list.ru [St. Petersburg State Maritime Technical University (Sevmashvtuz), Severodvinsk Branch (Russian Federation)

2012-03-15T23:59:59.000Z

6

Yankee Nuclear Power Station - analysis of decommissioning costs  

SciTech Connect

The preparation of decommissioning cost estimates for nuclear power generating stations has received a great deal of interest in the last few years. Owners are required by regulation to ensure that adequate funds are collected for the timely decommissioning of their facilities. The unexpected premature shutdown of several facilities and uncertainties associated with radioactive waste disposal and long-term spent-fuel storage, when viewed in the light of a deregulated electric utility industry, has caused many companies to reevaluate their decommissioning cost estimates. The decommissioning of the Yankee Nuclear Power Station represents the first large-scale project involving the complete decontamination and dismantlement of a commercial light water nuclear power generation facility in the United States. Since this pressurized water reactor operated for 32 yr at a respectable 74% lifetime capacity factor, the actual costs and resources required to decommission the plant, when compared with decommissioning estimates, will yield valuable benchmarking data.

Lessard, L.P. [Yankee Atomic Electric Co., Bolton, MA (United States)

1996-12-31T23:59:59.000Z

7

Bayesian Analysis for the Site-Specific Dose Modeling in Nuclear Power Plant Decommissioning.  

E-Print Network (OSTI)

??Decommissioning is the process of closing down a facility. In nuclear power plant decommissioning, it must be determined that that any remaining radioactivity at a… (more)

Ling, Xianbing

2001-01-01T23:59:59.000Z

8

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

9

Program Change Management During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

Decommissioning a nuclear power plant is a complex project, which involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As plants meet certain project Milestones, the evolution of such plant programs and regulations can help optimize project execution and cost. This report provides information about these Milestones and the plant departments and programs that change throughout a decommissioning project.

2009-12-11T23:59:59.000Z

10

The Decommissioning of the Trino Nuclear Power Plant  

Science Conference Proceedings (OSTI)

Following a referendum in Italy in 1987, the four Nuclear Power Plants (NPPs) owned and operated by the state utility ENEL were closed. After closing the NPPs, ENEL selected a ''safestore'' decommissioning strategy; anticipating a safestore period of some 40-50 years. This approach was consistent with the funds collected during plant operation, and was reinforced by the lack of both a waste repository and a set of national free release limits for contaminated materials in Italy. During 1999, twin decisions were made to privatize ENEL and to transform the nuclear division into a separate subsidiary of the ENEL group. This group was renamed Sogin and during the following year, ownership of the company was transferred to the Italian Treasury. On formation, Sogin was asked by the Italian government to review the national decommissioning strategy. The objective of the review was to move from a safestore strategy to a prompt decommissioning strategy, with the target of releasing all of the nuclear sites by 2020. It was recognized that this target was conditional upon the availability of a national LLW repository together with interim stores for both spent fuel and HLW by 2009. The government also agreed that additional costs caused by the acceleration of the decommissioning program would be considered as stranded costs. These costs will be recovered by a levy on the kWh price of electricity, a process established and controlled by the Regulator of the Italian energy sector. Building on the successful collaboration to develop a prompt decommissioning strategy for the Latina Magnox reactor (1), BNFL and Sogin agreed to collaborate on an in depth study for the prompt decommissioning of the Sogin PWR at Trino. BNFL is currently decommissioning six NPPs and is at an advanced stage of planning for two further units, having completed a full and rigorous exercise to develop Baseline Decommissioning Plans (BDP's) for these stations. The BDP exercise utilizes the full range of BNFL decommissioning experience and knowledge to develop a strategy, methodology and cost for the decommissioning of NPPs. Over the past year, a prompt decommissioning strategy for Trino has been developed. The strategy has been based on the principles of minimizing waste products that require long term storage, maximizing 'free release' materials and utilizing existing and regulatory approved technologies.

Brusa, L.; DeSantis, R.; Nurden, P. L.; Walkden, P.; Watson, B.

2002-02-27T23:59:59.000Z

11

Nuclear Plant Decommissioning  

Science Conference Proceedings (OSTI)

In the 1990s several nuclear utilities proceeded with full decommissioning of their nuclear power plants based on perceived economics. This major shift to immediate decommissioning presented a significant challenge to the industry in terms of the development of a decommissioning process and a comprehensive updated regulatory framework. EPRI responded by undertaking the formation of the Decommissioning Support Program. The initial work involved conducting a series of topical workshops directed to specific...

2010-11-24T23:59:59.000Z

12

Power Reactor Decommissioning Experience  

Science Conference Proceedings (OSTI)

During the past two decades the NRC regulated nuclear industry has encountered and dealt with a diverse range of political, financial and technological challenges while decommissioning its nuclear facilities. During that time, the decommissioning of nuclear facilities has evolved into a mature industry in the United States with a number of large power reactors successfully decommissioned and their NRC licenses terminated. One of the challenges discussed in this report is site release standards, required ...

2011-07-08T23:59:59.000Z

13

Nuclear Decommissioning Financing Act (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

The Nuclear Decommissioning Financing Act calls for the establishment of a tax-exempt, tax-deductible decommissioning fund by the licensee of any nuclear power generating facility to pay for the...

14

Characterization and Dose Modeling of Soil, Sediment and Bedrock During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

A decommissioning nuclear power plant must confirm that the radionuclides present in the soils, sediments, and bedrock left on site at the time of license termination will meet the appropriate dose limits for site release. This process involves the characterization, dose modeling, and if required, remediation, of these media. At some decommissioning nuclear power plants, the management of contaminated soil, sediments, and bedrocks was a major project that led to generation of remediation projects and rad...

2009-11-20T23:59:59.000Z

15

Effect of Nuclear Power Plant Decommissioning Costs on Plant Life Cycle Decisions  

Science Conference Proceedings (OSTI)

Nuclear utilities implementing Life Cycle Management (LCM) Programs and facing run-relicense-retire decisions need to evaluate the financial cost/benefit of such decisions. Decommissioning costs are one element of these evaluations. This report includes a decommissioning cost estimate for Calvert Cliffs Nuclear Power Plant (CCNPP) that can be used as a reference source by nuclear utilities involved in LCM and license renewal (LR) decisions.

1995-07-01T23:59:59.000Z

16

Comparison of Decommissioning Dose Modeling Codes for Nuclear Power Plant Use: RESRAD and DandD  

Science Conference Proceedings (OSTI)

A number of power plants are currently in the decommissioning phase. As the plants seek to terminate their operating license, they need to successfully conduct definite dose assessments. To assist these utilities in selecting an analysis code and appropriate input data, EPRI conducted a code comparison. However, this report was done as the industry's input to the NRC on their evolving review and improvement of decommissioning modeling. In early 2000, EPRI will publish a report for the commercial nuclear ...

1999-10-29T23:59:59.000Z

17

Decision to reorganise or reorganising decisions? A First-Hand Account of the Decommissioning of the Phnix Nuclear Power Plant  

E-Print Network (OSTI)

of scheduled nuclear reactor shutdowns. It was also the approach adopted for the study presented here, which in the decommissioning of nuclear facilities. ORGANISATIONAL THEORY AND RESEARCH TOOL VALIDATION The study of the Decommissioning of the Phénix Nuclear Power Plant Melchior Pelleterat de Borde, MINES ParisTech, Christophe Martin

Paris-Sud XI, Université de

18

Technology, safety and costs of decommissioning a reference boiling water reactor power station: Comparison of two decommissioning cost estimates developed for the same commercial nuclear reactor power station  

SciTech Connect

This study presents the results of a comparison of a previous decommissioning cost study by Pacific Northwest Laboratory (PNL) and a recent decommissioning cost study of TLG Engineering, Inc., for the same commercial nuclear power reactor station. The purpose of this comparative analysis on the same plant is to determine the reasons why subsequent estimates for similar plants by others were significantly higher in cost and external occupational radiation exposure (ORE) than the PNL study. The primary purpose of the original study by PNL (NUREG/CR-0672) was to provide information on the available technology, the safety considerations, and the probable costs and ORE for the decommissioning of a large boiling water reactor (BWR) power station at the end of its operating life. This information was intended for use as background data and bases in the modification of existing regulations and in the development of new regulations pertaining to decommissioning activities. It was also intended for use by utilities in planning for the decommissioning of their nuclear power stations. The TLG study, initiated in 1987 and completed in 1989, was for the same plant, Washington Public Supply System's Unit 2 (WNP-2), that PNL used as its reference plant in its 1980 decommissioning study. Areas of agreement and disagreement are identified, and reasons for the areas of disagreement are discussed. 31 refs., 3 figs., 22 tabs.

Konzek, G.J.; Smith, R.I. (Pacific Northwest Lab., Richland, WA (USA))

1990-12-01T23:59:59.000Z

19

Determining Background Radiation Levels in Support of Decommissioning Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report is a technical reference for determining background radiation levels in support of surveys for decommissioning nuclear power facilities. Careful planning and data evaluation are essential for a valid survey. The report discusses important considerations for successful establishment of background levels for soils, surfaces, structures, and groundwater. It also explores alternatives to performing a formal background study.

2001-11-26T23:59:59.000Z

20

Trojan Nuclear Power Plant Reactor Vessel and Internals Removal: Trojan Nuclear Plant Decommissioning Experience  

Science Conference Proceedings (OSTI)

One goal of the EPRI Decommissioning Technology Program is to capture the growing utility experience in nuclear plant decommissioning activities for the benefit of other utilities facing similar challenges in the future. This report provides historical information on the background, scope, organization, schedule, cost, contracts, and support activities associated with the Trojan Nuclear Plant Reactor Vessel and Internals Removal (RVAIR) Project. Also discussed are problems, successes, and lessons learned...

2000-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Capturing Historical Knowledge for Decommissioning of Nuclear Power Plants: Summary of Historical Site Assessments at Eight Decommis sioning Plants  

Science Conference Proceedings (OSTI)

This report describes approaches utilized and experience gained in the development of early characterization activities by a number of nuclear power plants undergoing decommissioning. In particular, the report provides experience and lessons of performing the Historical Site Assessment, or HSA.

2004-04-01T23:59:59.000Z

22

Use of In-Situ Gamma Spectroscopy During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

Due to leakage and other events that may occur during nuclear power plant operations, soil, concrete and bedrock have the potential to become contaminated, and therefore must be characterized to demonstrate that they meet strict regulatory site release limits. This report provides detailed information on the use of portable gamma spectroscopy systems for the characterization and Final Status Survey of soil, concrete and bedrock contaminated with radionuclides at a number of plants undergoing decommission...

2010-12-06T23:59:59.000Z

23

Environmental Problems Associated With Decommissioning The Chernobyl Nuclear Power Plant Cooling Pond  

SciTech Connect

Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

2009-11-09T23:59:59.000Z

24

ENVIRONMENTAL PROBLEMS ASSOCIATED WITH DECOMMISSIONING THE CHERNOBYL NUCLEAR POWER PLANT COOLING POND  

Science Conference Proceedings (OSTI)

Decommissioning of nuclear power plants and other nuclear fuel cycle facilities has been an imperative issue lately. There exist significant experience and generally accepted recommendations on remediation of lands with residual radioactive contamination; however, there are hardly any such recommendations on remediation of cooling ponds that, in most cases, are fairly large water reservoirs. The literature only describes remediation of minor reservoirs containing radioactive silt (a complete closure followed by preservation) or small water reservoirs resulting in reestablishing natural water flows. Problems associated with remediation of river reservoirs resulting in flooding of vast agricultural areas also have been described. In addition, the severity of environmental and economic problems related to the remedial activities is shown to exceed any potential benefits of these activities. One of the large, highly contaminated water reservoirs that require either remediation or closure is Karachay Lake near the MAYAK Production Association in the Chelyabinsk Region of Russia where liquid radioactive waste had been deep well injected for a long period of time. Backfilling of Karachay Lake is currently in progress. It should be noted that secondary environmental problems associated with its closure are considered to be of less importance since sustaining Karachay Lake would have presented a much higher radiological risk. Another well-known highly contaminated water reservoir is the Chernobyl Nuclear Power Plant (ChNPP) Cooling Pond, decommissioning of which is planned for the near future. This study summarizes the environmental problems associated with the ChNPP Cooling Pond decommissioning.

Farfan, E.

2009-09-30T23:59:59.000Z

25

Spent Fuel Pool Cooling and Cleanup During Decommissioning: Experience at Trojan Nuclear Power Plant  

Science Conference Proceedings (OSTI)

Operation of original in-plant spent fuel pool facilities at shutdown power plants is expensive compared to available alternatives and can interfere with the decommissioning process. This report describes the approach taken in the Trojan Decommissioning Project to establish independent cooling and cleanup services for the fuel pool until the spent fuel is placed in dry storage.

1999-03-15T23:59:59.000Z

26

Assessment of the radiological impact of a decommissioning nuclear power plant in Italy  

E-Print Network (OSTI)

The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

A. Petraglia; C. Sabbarese; M. De Cesare; N. De Cesare; F. Quinto; F. Terrasi; A. D'Onofrio; P. Steier; L. K. Fifield; A. M. Esposito

2012-07-17T23:59:59.000Z

27

Assessment of the radiological impact of a decommissioning nuclear power plant in Italy  

E-Print Network (OSTI)

The assessment of the radiological impact of a decommissioning Nuclear Power Plant is presented here through the results of an environmental monitoring survey carried out in the area surrounding the Garigliano Power Plant. The levels of radioactivity in soil, water, air and other environmental matrices are shown, in which {\\alpha}, {\\beta} and {\\gamma} activity and {\\gamma} equivalent dose rate are measured. Radioactivity levels of the samples from the Garigliano area are analyzed and then compared to those from a control zone situated more than 100 km away. Moreover, a comparison is made with a previous survey held in 2001. The analyses and comparisons show no significant alteration in the radiological characteristics of the area surroundings the plant, with an overall radioactivity depending mainly from the global fallout and natural sources.

Petraglia, A; De Cesare, M; De Cesare, N; Quinto, F; Terrasi, F; D'Onofrio, A; Steier, P; Fifield, L K; Esposito, A M; 10.1051/radiopro/2012010

2012-01-01T23:59:59.000Z

28

Rancho Seco Nuclear Generating Station Decommissioning Experience Report  

Science Conference Proceedings (OSTI)

Several U.S. nuclear power plants entered decommissioning in the 1990s. Based on current information, the next group of plants whose license will expire will not begin decommissioning for nearly a decade. This report provides detailed information on the decommissioning of one plant, the Rancho Seco Nuclear Generating Station, in order to capture its experience for future plants.

2007-12-19T23:59:59.000Z

29

Use of Probabilistic Methods in Nuclear Power Plant Decommissioning Dose Analysis  

Science Conference Proceedings (OSTI)

This report provides guidance on the use of probabilistic dose analysis in the demonstration of regulatory compliance for final release of decommissioned nuclear plant sites. It also addresses probabilistic dose analysis and the interpretation of its results in general terms. Finally, the report examines the use of the RESRAD 6.0 as a tool for screening dose analysis and for site-specific probabilistic dose analysis.

2002-05-21T23:59:59.000Z

30

Executive Director for Operations USE OF INSURANCE AS A METHOD TO PROVIDE FINANCIAL ASSURANCE FOR DECOMMISSIONING NUCLEAR POWER REACTORS  

E-Print Network (OSTI)

The purpose of this memorandum is to inform the Commission of the staff’s proposed Standard Review Plan (SRP) criteria for evaluating the insurance method of providing financial assurance for decommissioning nuclear power reactors and provide the status of the staff’s ongoing reviews of two insurance proposals. In a memorandum dated May 20, 2004, from then Executive Director for Operations, Dr. William Travers, the Commission was informed of the staff’s receipt of two first-of-a-kind proposals submitted by Marsh USA (Marsh) and Nuclear Electric Insurance Limited (NEIL) to use insurance to provide financial assurance for decommissioning nuclear power reactors pursuant to 10 CFR 50.75(e)(1)(iii). In that memorandum, the staff stated that it would develop SRP criteria to evaluate the use of insurance, commence reviews of the two proposals, and inform the Commission of its progress by October 2004. The U.S. Nuclear Regulatory Commission (NRC) regulations at 10 CFR 50.75(e) specify that insurance is an acceptable method for a licensee to demonstrate reasonable assurance that sufficient funds will be available for the plant decommissioning process. Specifically, 10 CFR 50.75(e)(1)(iii) requires that certain terms and conditions must be present in the decommissioning insurance policy. These conditions include: automatic renewal, 90-days advance notice by the insurer of intent not to renew the policy, and payment of the full face amount into a trust if the licensee fails to provide an acceptable replacement after receiving notice of the insurer’s intent to cancel the policy. CONTACT: Ronald B. Uleck, NRR/DRIP 301-415-3741 The Commissioners-2-However, 10 CFR 50.75 contains only limited requirements for use of the insurance method. Similarly, existing guidance provided by NUREG-1577, Rev. 1, “Standard Review Plan on

unknown authors

2004-01-01T23:59:59.000Z

31

Safety of Decommissioning of Nuclear Facilities  

Science Conference Proceedings (OSTI)

Full text of publication follows: ensuring safety during all stages of facility life cycle is a widely recognised responsibility of the operators, implemented under the supervision of the regulatory body and other competent authorities. As the majority of the facilities worldwide are still in operation or shutdown, there is no substantial experience in decommissioning and evaluation of safety during decommissioning in majority of Member States. The need for cooperation and exchange of experience and good practices on ensuring and evaluating safety of decommissioning was one of the outcomes of the Berlin conference in 2002. On this basis during the last three years IAEA initiated a number of international projects that can assist countries, in particular small countries with limited resources. The main IAEA international projects addressing safety during decommissioning are: (i) DeSa Project on Evaluation and Demonstration of Safety during Decommissioning; (ii) R{sup 2}D{sup 2}P project on Research Reactors Decommissioning Demonstration Project; and (iii) Project on Evaluation and Decommissioning of Former Facilities that used Radioactive Material in Iraq. This paper focuses on the DeSa Project activities on (i) development of a harmonised methodology for safety assessment for decommissioning; (ii) development of a procedure for review of safety assessments; (iii) development of recommendations on application of the graded approach to the performance and review of safety assessments; and (iv) application of the methodology and procedure to the selected real facilities with different complexities and hazard potentials (a nuclear power plant, a research reactor and a nuclear laboratory). The paper also outlines the DeSa Project outcomes and planned follow-up activities. It also summarises the main objectives and activities of the Iraq Project and introduces the R{sup 2}D{sup 2} Project, which is a subject of a complementary paper.

Batandjieva, B.; Warnecke, E.; Coates, R. [International Atomic Energy Agency, Vienna (Austria)

2008-01-15T23:59:59.000Z

32

Fort St. Vrain Decommissioning: Public Relations and Human Resources Issues: Personnel Plans and Communications During Decommissioni ng of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report details aspects of the personnel plan instrumental in the successful decommissioning of Fort St. Vrain nuclear power plant. It includes discussion of the personnel retention program, actions taken to mitigate harassment and intimidation issues, and the communications plan. The report also discusses some decommissioning pitfalls encountered, signs of trouble brewing, and ways to mitigate personnel problems before they become serious issues. Project managers designed the document to be generic ...

1998-02-13T23:59:59.000Z

33

Evaluation of Radionuclides in Concrete Shielding for Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

Shielding / Special Issue on the 11th International Conference on Radiation Shielding and the 15th Topical Meeting of the Radiation Protection and Shielding Division (Part 2) / Decontamination/Decommissioning

Yen-Fu Chen; Yen-Kung Lin; Rong-Jiun Sheu; Shiang-Huei Jiang

34

Power Burst Facility (PBF) Reactor Reactor Decommissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Reactor Decommissioning Click here to view Click here to view Reactor Decommissioning Click on an image to enlarge A crane removes the reactor vessel from the Power Burst Facility...

35

Application of Non-Nuclear Robotics to Nuclear Industry Decommissioning  

Science Conference Proceedings (OSTI)

Segmentation of radioactive components, including reactor cavity internals, has proved to be a challenging job for the nuclear power industry during decommissioning. The innovative use of robotic technology to perform debris cleanup can help utilities maximize worker safety. This report documents a first of its kind robotics experience at Connecticut Yankee.

2004-08-11T23:59:59.000Z

36

Decommissioning considerations at a time of nuclear renaissance  

SciTech Connect

At a time of renaissance in the nuclear power industry, when it is estimated that anywhere between 60 to 130 new power reactors may be built worldwide over the next 15 years, why should we focus on decommissioning? Yet it is precisely the time to examine what decommissioning considerations should be taken into account as the industry proceeds with developing final designs for new reactors and the construction on the new build begins. One of the lessons learned from decommissioning of existing reactors has been that decommissioning was not given much thought when these reactors were designed three or four decades ago. Even though decommissioning may be sixty years down the road from the time they go on line, eventually all reactors will be decommissioned. It is only prudent that new designs be optimized for eventual decommissioning, along with the other major considerations. The overall objective in this regard is that when the time comes for decommissioning, it can be completed in shorter time frames, with minimum generation of radioactive waste, and with better radiological safety. This will ensure that the tail end costs of the power reactors are manageable and that the public confidence in the nuclear power is sustained through the renaissance and beyond. (author)

Devgun, Jas S. [Nuclear Power Technologies, Sargent and Lundy LLC, 55 E. Monroe St, Chicago, IL 60603 (United States)

2007-07-01T23:59:59.000Z

37

How clean is coal : coal power plant ash pond regulations compared to nuclear reactor decommissioning standards.  

E-Print Network (OSTI)

??Coal power is the prominent source of energy in the United States (U.S.) and around the world. The byproducts of coal power contain many of… (more)

[No author

2011-01-01T23:59:59.000Z

38

Confidentiality Agreement between the Nuclear Decommissioning Authority and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Communication & Engagement » International Programs » Services » Communication & Engagement » International Programs » Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority in UK and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy More Documents & Publications Statement of Intent between the US Department of Energy and UK Nuclear Decommissioning Authority Scanned_Agreement.pdf Statement of Intent NO. 2 between the US Department of Energy and UK Nuclear Decommissioning Authority Waste Management Nuclear Materials & Waste

39

Decommissioning San Onofre Nuclear Generating Station Unit 1 (SONGS-1)  

Science Conference Proceedings (OSTI)

Decommissioning a nuclear power plant and termination of the plant license requires the removal of highly activated materials from inside the nuclear reactor pressure vessel (RPV). Such a task presents a major challenge in terms of technology, project management, and worker exposure. This report documents the approach taken by Southern California Edison (SCE) in their highly successful reactor vessel internals (RVI) segmentation of San Onofre Nuclear Generating Station Unit 1 (SONGS-1). The report detail...

2005-12-12T23:59:59.000Z

40

4.1.4 NUCLEAR SUBSTANCE ROOM DECOMMISSIONING FORM The permit holder shall ensure that prior to decommissioning any area, room or enclosure where  

E-Print Network (OSTI)

and efficiency of telerobotics in the decontamination and decommissioning of nuclear power plants. Currently, we, LLC Nuclear Engineering Technology Initiatives The Nuclear Engineering (NE) Division carries out · Decontamination & Decommissioning ­ Laser processing technology for decontamination of surfaces · Refractory Alloy

Sinnamon, Gordon J.

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Decommissioning License Termination Plan Documents and Lessons Learned: Summary of LTPs for Two Reactors and Nuclear Regulatory Comm ission Safety Evaluation Reports for Three Nuclear Power Plant LTPs  

Science Conference Proceedings (OSTI)

This report offers those utilities beginning the preparation of License Termination Plans (LTPs) in the near future a comprehensive summary of the approaches currently taken in LTP preparation by major nuclear decommissioning projects. The report details the approach taken in addressing each element of the LTP, and the lessons learned by those utilities currently undergoing the license termination process. This document provides needed guidance for the LTP process, and will greatly benefit utilities cons...

2004-04-28T23:59:59.000Z

42

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

the Nuclear Power Decommissioning Act, which gives thetrend towards nuclear decommissioning that has been driving

Bolinger, Mark

2001-01-01T23:59:59.000Z

43

Decommissioning Economics and Risk Advisor: An Introduction to DERAD Version 2.0: Volume 1: EPRI's Nuclear Decommissioning Program; Volume 2: Methodology Description; Volume 3: Program Manual; Volume 4: Using DERAD  

Science Conference Proceedings (OSTI)

Decommissioning of commercial nuclear plants in the United States is estimated to cost hundreds of millions of dollars per plant. EPRI's Decommissioning Economics and Risk Advisor (DERAD) Version 2.0 is a decision analysis support tool designed to help utilities evaluate the economics and financial risk of decommissioning nuclear power plants. This report provides examples and case studies to support DERAD use.

1996-09-17T23:59:59.000Z

44

Ris-R-1250(EN) Decommissioning of the Nuclear  

E-Print Network (OSTI)

Risø-R-1250(EN) Decommissioning of the Nuclear Facilities at Risø National Laboratory Descriptions on request from the Minister of Research and Information Technology. It describes the nuclear facilities;Decommissioning of Risø's nuclear facilities. Descriptions and cost assessment. Risø-R-1250(EN) 3 Contents 1

45

Statement of Intent No. 2 between DOE and the Nuclear Decommissioning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Intent No. 2 between DOE and the Nuclear Decommissioning Authority Statement of Intent No. 2 between DOE and the Nuclear Decommissioning Authority Statement of Intent...

46

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

47

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

48

Decommissioning Handbook for Coal-Fired Power Plants  

Science Conference Proceedings (OSTI)

This handbook lays out the steps necessary to fully decommission a coal-fired power plant. The handbook includes ways to handle permitting, environmental cleanup, site dismantlement, and site remediation, and discusses overall decommissioning costs. It is based on three actual case studies of coal plants recently decommissioned: the Arkwright coal-fired plant of Georgia Power, the Watts Bar coal-fired plant of TVA, and the Port Washington coal-fired plant of Wisconsin Electric Power.

2004-11-04T23:59:59.000Z

49

Future AI and Robotics Technology for Nuclear Plants Decommissioning  

E-Print Network (OSTI)

Robotics Program The Robotics Program within the Nuclear Engineering Division is developing new technologies. Currently, we are exploring opportunities in applications for nuclear reactor operation, maintenance of remote energy installations, decontamination and decommissioning, and minimally invasive surgery

Hu, Huosheng

50

Decommissioning Process for Fossil-Fueled Power Plants  

Science Conference Proceedings (OSTI)

This report describes a staged process for the decommissioning and possible demolition of fossil-fueled power generating facilities. Drawn from experience with power and major industrial facilities, the report provides the owner/operator of a plant that is approaching the end of its useful life with an overview of the key elements necessary to successfully implement decommissioning. The process is applicable to full decommissioning, demolition, and closure; to partial scenarios (that is, partial dismantl...

2010-01-22T23:59:59.000Z

51

San Onofre Nuclear Generating Station - Unit 1 Decommissioning Experience Report  

Science Conference Proceedings (OSTI)

This report provides detailed information on the successful decommissioning activities of San Onofre Nuclear Generating Station, Unit 1 (SONGS 1). The report describes their experiences and lessons learned for managers of US and international plants beginning or currently engaged in decommissioning.

2008-12-04T23:59:59.000Z

52

Safety Oversight of Decommissioning Activities at DOE Nuclear Sites  

Science Conference Proceedings (OSTI)

The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive material contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.

Zull, Lawrence M.; Yeniscavich, William [Defense Nuclear Facilities Safety Board, 625 Indiana Ave., NW, Suite 700, Washington, DC 20004-2901 (United States)

2008-01-15T23:59:59.000Z

53

Nuclear reactor decommissioning. (Latest citations from the NTIS bibliographic database). Published Search  

Science Conference Proceedings (OSTI)

The bibliography contains citations concerning nuclear power and research reactor decommissioning and decontamination plans, costs, and safety standards. References discuss the design and evaluation of protective confinement, entombment, and dismantling systems. Topics include decommissioning regulations and rules, public and occupational radiation exposure estimates, comparative evaluation, and reactor performance under high neutron flux conditions. Waste packaging and disposal, environmental compliance, and public opinion are examined. (Contains 50-250 citations and includes a subject term index and title list.) (Copyright NERAC, Inc. 1995)

NONE

1997-10-01T23:59:59.000Z

54

Release of radioisotopes and activated materials from nuclear installations and facilities  

E-Print Network (OSTI)

decommissioned. The decommissioning of a 60 Co therapy unit,problems. However, the decommissioning of an acceleratorto be disposed of. The decommissioning of a nuclear power

Manfredi, P.F.; Millaud, J.E.

2001-01-01T23:59:59.000Z

55

Progressive Application Decommissioning Models for U.S. Power and Research Reactors  

SciTech Connect

This paper presents progressive engineering techniques and experiences in decommissioning projects performed by Bums and Roe Enterprises within the last fifteen years. Specifically, engineering decommissioning technical methods and lessons learned are discussed related to the Trojan Large Component Removal Project, San Onofre Nuclear Generating Station (SONGS) Decommissioning Project and the Brookhaven Graphite Research Reactor (BGRR) Decommissioning Project Study. The 25 years since the 1979 TMI accident and the events following 9/11 have driven the nuclear industry away from excessive, closed/elitist conservative methods towards more pragmatic results-oriented and open processes. This includes the essential recognition that codes, standards and regulatory procedures must be efficient, effective and fit for purpose. Financial and open-interactive stakeholder pressures also force adherence to aggressive risk reduction posture in the area of a safety, security and operations. The engineering methods and techniques applied to each project presented unique technical solutions. The decommissioning design for each project had to adopt existing design rules applicable to construction of new nuclear power plants and systems. It was found that the existing ASME, NRC, and DOE codes and regulations for deconstruction were, at best, limited or extremely conservative in their applicability to decommissioning. This paper also suggests some practical modification to design code rules in application for decommissioning and deconstruction. The representative decommissioning projects, Trojan, SONGS and Brookhaven, are discussed separately and the uniqueness of each project, in terms of engineering processes and individual deconstruction steps, is discussed. Trojan Decommissioning. The project included removal of entire NSSS system. The engineering complexity was mainly related to the 1200 MW Reactor. The approach, process of removal, engineering method related to protect the worker against excessive radiation exposure, transportation, and satisfying applicable rules and regulations, were the major problems to overcome. The project's successful completed earned a patent award. SONGS Decommissioning. The reactor's spherical containment and weakened integrity was the scope of this decommissioning effort. The aspects of structure stability and method of deconstruction is the major part of the presentation. The economical process of deconstruction, aspects of structural stability, worker safety, and the protection of the surrounding environment from contamination is highlighted in this section. BGRR Decommissioning Study. BREI was commissioned by Brookhaven National Laboratory (BNL) to evaluate and analyze the stability, and progressive decommissioning, and removal of BGRR components. This analysis took the form of several detailed decommissioning studies that range from disassembly and removal of the unit's graphite pile to the complete environmental restoration of the reactor site. While most of the facility's decommissioning effort is conventional, the graphite pile and its biological shield present the greatest challenge. The studies develop a unique method of removing high-activity waste trapped in the graphite joints. (authors)

Studnicka, Z.; Lacy, N.H.; Nicholas, R.G.; Campagna, M.; Morgan, R.D. [Bums and Roe Enterprises, Inc., 800 Kinderkamack Road, Oradell, NJ 07649 (United States); Sawruk, W. [ABS Consulting, Inc., 5 Birdsong Court, Shillington, PA 19607 (United States)

2006-07-01T23:59:59.000Z

56

Technology, Safety and Costs of Decommissioning Nuclear Reactors At Multiple-Reactor Stations  

SciTech Connect

Safety and cost information is developed for the conceptual decommissioning of large (1175-MWe) pressurized water reactors (PWRs) and large (1155-MWe) boiling water reactors {BWRs) at multiple-reactor stations. Three decommissioning alternatives are studied: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). Safety and costs of decommissioning are estimated by determining the impact of probable features of multiple-reactor-station operation that are considered to be unavailable at a single-reactor station, and applying these estimated impacts to the decommissioning costs and radiation doses estimated in previous PWR and BWR decommissioning studies. The multiple-reactor-station features analyzed are: the use of interim onsite nuclear waste storage with later removal to an offsite nuclear waste disposal facility, the use of permanent onsite nuclear waste disposal, the dedication of the site to nuclear power generation, and the provision of centralized services. Five scenarios for decommissioning reactors at a multiple-reactor station are investigated. The number of reactors on a site is assumed to be either four or ten; nuclear waste disposal is varied between immediate offsite disposal, interim onsite storage, and immediate onsite disposal. It is assumed that the decommissioned reactors are not replaced in one scenario but are replaced in the other scenarios. Centralized service facilities are provided in two scenarios but are not provided in the other three. Decommissioning of a PWR or a BWR at a multiple-reactor station probably will be less costly and result in lower radiation doses than decommissioning an identical reactor at a single-reactor station. Regardless of whether the light water reactor being decommissioned is at a single- or multiple-reactor station: • the estimated occupational radiation dose for decommissioning an LWR is lowest for SAFSTOR and highest for DECON • the estimated cost of decommissioning a PWR is lowest for ENTOMB and highest for SAFSTOR • the estimated cost of decommissioning a BWR is lowest for OECON and highest for SAFSTOR. In all cases, SAFSTOR has the lowest occupational radiation dose and the highest cost.

Wittenbrock, N. G.

1982-01-01T23:59:59.000Z

57

Release of radioisotopes and activated materials from nuclear installations and facilities  

E-Print Network (OSTI)

wastes coming from the decommissioning of nuclear reactors,use of a nuclear facility The decommissioning, refurbishingdisposed of. The decommissioning of a nuclear power station

Manfredi, P.F.; Millaud, J.E.

2001-01-01T23:59:59.000Z

58

Decommissioning of Risř's nuclear facilities. Descriptions and cost assessment.  

E-Print Network (OSTI)

nuclear facilities at Risř National Laboratory to be decommissioned and gives an assessment of the work to be done and the costs incurred. Three decommissioning scenarios were considered with decay times of 10, 25 and 40 years for the DR 3 reactor. The assessments conclude, however, that there will not be much to gain by allowing for the longer decay periods; some operations still will need to be performed remotely. Furthermore, the report describes some of the legal and licensing framework for the decommissioning and gives an assessment of the amounts of radioactive waste to be transferred to a Danish repository. ISBN 87-550-2844-6; 87-550-2846-2 (Internet)

Edited Kurt Lauridsen

2001-01-01T23:59:59.000Z

59

Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities  

E-Print Network (OSTI)

1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

American Society for Testing and Materials. Philadelphia

2009-01-01T23:59:59.000Z

60

Decommissioning Planning  

Science Conference Proceedings (OSTI)

The purpose of this EPRI Technical Report is to provide a series of pre-planning guidance documents for the decommissioning of a nuclear power plant. This guidance is based in part upon Nuclear Decommissioning Plans (NDPs) developed by Commonwealth Edison (now Exelon) following the premature closure of Zion Station in 1998 as well as from other industry references and experience. These NDPs focus on the planning activities over the period from prior to final shutdown through the transition period into de...

2006-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Community wind power ownership schemes in Europe and their relevance to the United States  

E-Print Network (OSTI)

is this trend towards nuclear decommissioning that has beenRiksdag passed the Nuclear Power Decommissioning Act, which

Bolinger, Mark

2001-01-01T23:59:59.000Z

62

Nuclear Power Plant Design Project  

E-Print Network (OSTI)

................................................. 22 5.1.16 Decommissioning: AP600, HTGR, ALWR ............................................................................................................... 35 7.3.4 Decommissioning Cost #12;9 decommissioning. The long delayed nuclear waste disposal facility at Yucca Mountain is becoming

63

Connecticut Yankee Decommissioning Experience Report  

Science Conference Proceedings (OSTI)

Several U.S. nuclear power plants entered decommissioning in the 1990's. Based on current information, the next group of plants whose license will expire will not begin decommissioning for nearly a decade. This report provides detailed information on the decommissioning of one power reactor - Connecticut Yankee, in order to provide their experience for future plants.

2006-11-20T23:59:59.000Z

64

Estimating decommissioning costs: The 1994 YNPS decommissioning cost study  

Science Conference Proceedings (OSTI)

Early this year, Yankee Atomic Electric Company began developing a revised decommissioning cost estimate for the Yankee Nuclear Power Station (YNPS) to provide a basis for detailed decommissioning planning and to reflect slow progress in siting low-level waste (LLW) and spent-nuclear-fuel disposal facilities. The revision also reflects the need to change from a cost estimate that focuses on overall costs to a cost estimate that is sufficiently detailed to implement decommissioning and identify the final cost of decommissioning.

Szymczak, W.J.

1994-12-31T23:59:59.000Z

65

Lessons Learned from the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities. Outcomes of the International Conference, 11-15 December 2006, Athens, Greece  

Science Conference Proceedings (OSTI)

Full text of publication follows: decommissioning activities are increasing worldwide covering wide range of facilities - from nuclear power plant, through fuel cycle facilities to small laboratories. The importance of these activities is growing with the recognition of the need for ensuring safe termination of practices and reuse of sites for various purposes, including the development of new nuclear facilities. Decommissioning has been undertaken for more than forty years and significant knowledge has been accumulated and lessons have been learned. However the number of countries encountering decommissioning for the first time is increasing with the end of the lifetime of the facilities around the world, in particular in countries with small nuclear programmes (e.g. one research reactor) and limited human and financial resources. In order to facilitate the exchange of lessons learned and good practices between all Member States and to facilitate and improve safety of the planned, ongoing and future decommissioning projects, the IAEA in cooperation with the Nuclear Energy Agency to OECD, European Commission and World Nuclear Association organised the international conference on Lessons Learned from the Decommissioning of Nuclear Facilities and the Safe Termination of Nuclear Activities, held in Athens, Greece. The conference also highlighted areas where future cooperation at national and international level is required in order to improve decommissioning planning and safety during decommissioning and to facilitate decommissioning by selecting appropriate strategies and technologies for decontamination, dismantling and management of waste. These and other aspects discussed at the conference are presented in this paper, together with the planned IAEA measures for amendment and implementation of the International Action Plan on Decommissioning of Nuclear Facilities and its future programme on decommissioning.

Batandjieva, B.; Laraia, M. [International Atomic Energy Agency, Vienna (Austria)

2008-01-15T23:59:59.000Z

66

Pending Issues In Decommissioning Of Nuclear Installations In Developing Countries  

E-Print Network (OSTI)

While decommissioning technology and infrastructures are reasonably mature in fully developed countries at the beginning of the third millennium, this is not necessarily the case for some developing countries. It is unfortunate that many of these countries have given little or no attention to early planning and creation of infrastructures for the decommissioning of their nuclear installations, which in many cases are candidates for permanent shutdown in the near future. Critical areas include inter alia (1) poor or no allocation of decommissioning funds, (2) uncertain availability of affordable technologies, (3) unclear definition of roles and responsibilities including lack of regulations, (4) inadequate management and organization techniques, (5) perceived low priority and weak political support, and (6) lack of human and technical resources, particularly in the long term. The International Atomic Energy Agency (IAEA) is a unique forum to identify and address current and prospecti...

Michele Laraia International

2000-01-01T23:59:59.000Z

67

The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities  

SciTech Connect

Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee [Korea Atomic Energy Research Institute, Deokjin-dong 150, Yuseong-gu, Daejeon 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

68

Conceptual Nuclear Decommissioning Knowledge Management System Design  

Science Conference Proceedings (OSTI)

Taiwan Research Reactor (TRR) was shut down in January 1988, along with the termination of a few nuclear facilities within Institute of Nuclear Energy Research (INER). In the past few years, INER has continually dismantled its related nuclear facilities. ...

I-Hsin Chou; Chin-Feng Fan; Yen-Chang Tzeng

2005-07-01T23:59:59.000Z

69

PROPOSED AMENDMENT TO THE NUCLEAR POWER PLANT  

E-Print Network (OSTI)

NOTE TO EDITORS: The Nuclear Regulatory Commission has received two reports from its independent Advisory Committee on Reactor Safeguards. The attached reports, in the form of letters, comment on a proposed amendment to the NRC's rule on license renewal for nuclear power plants and a proposed revision to the decommissioning rule for nuclear power reactors. Attachments:

T. S. Kress

1995-01-01T23:59:59.000Z

70

Technical Bases for the Development and Application of Derived Concentration Guidance Levels for Decommissioning and License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Nuclear Power plants achieve license termination by meeting regulatory site release criteria. Depending on the country, these criteria may be based on radionuclide concentration or dose. For dose-based criteria, corresponding radionuclide concentration limits, called Derived Concentration Guidance Levels (DCGLs), must also be developed. This report provides information related to site release criteria and the development of DCGLs.BackgroundThe ultimate goal ...

2012-09-10T23:59:59.000Z

71

Decommissioning Yankee Rowe  

Science Conference Proceedings (OSTI)

This article describes the process and progress of the decommissioning of the Yankee Rowe Nuclear Power Plant in Massachusetts. In 32 years Yankee Rowe was a safe, reliable and economical power source for New England. The uncertain near-term availability of disposal facilities for low-level waste, spent fuel, and other high level waste presents special challenges to the decommissioning. The decommissioning plan was submitted to the USNRC in December 1993 with final approval anticipated in 1994. Topics highlighted in this article are the decommissioning plan and the component removal program.

Heider, K.J.; Mellor, R.A.

1994-07-01T23:59:59.000Z

72

Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission  

SciTech Connect

Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future.

Rodriguez, Rafael L. [United States Nuclear Regulatory Commission, Office of Federal and State Materials and Environmental Management Programs, Washington, DC 20555 (United States)

2008-01-15T23:59:59.000Z

73

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

74

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

75

Nuclear Power  

E-Print Network (OSTI)

The world of the twenty first century is an energy consuming society. Due to increasing population and living standards, each year the world requires more energy and new efficient systems for delivering it. Furthermore, the new systems must be inherently safe and environmentally benign. These realities of today's world are among the reasons that lead to serious interest in deploying nuclear power as a sustainable energy source. Today's nuclear reactors are safe and highly efficient energy systems that offer electricity and a multitude of co-generation energy products ranging from potable water to heat for industrial applications. The goal of the book is to show the current state-of-the-art in the covered technical areas as well as to demonstrate how general engineering principles and methods can be applied to nuclear power systems.

Tsvetkov, Pavel

2010-08-01T23:59:59.000Z

76

Report to Congress on Plan for Interim Storage of Spent Nuclear Fuel from Decommissioned Reactors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites December 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C. Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel The picture on the cover is the Connecticut Yankee Independent Spent Fuel Storage Installation site in Haddam, Connecticut, with 43 dry storage NRC-licensed dual-purpose (storage and transport) casks. ii Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel EXECUTIVE SUMMARY The House Appropriations Committee Print that accompanied the Consolidated Appropriations Act, 2008, requests that the U.S. Department of Energy (the Department):

77

Designing Reactors to Facilitate Decommissioning  

SciTech Connect

Critics of nuclear power often cite issues with tail-end-of-the-fuel-cycle activities as reasons to oppose the building of new reactors. In fact, waste disposal and the decommissioning of large nuclear reactors have proven more challenging than anticipated. In the early days of the nuclear power industry the design and operation of various reactor systems was given a great deal of attention. Little effort, however, was expended on end-of-the-cycle activities, such as decommissioning and disposal of wastes. As early power and test reactors have been decommissioned difficulties with end-of-the-fuel-cycle activities have become evident. Even the small test reactors common at the INEEL were not designed to facilitate their eventual decontamination, decommissioning, and dismantlement. The results are that decommissioning of these facilities is expensive, time consuming, relatively hazardous, and generates large volumes of waste. This situation clearly supports critics concerns about building a new generation of power reactors.

Richard H. Meservey

2006-06-01T23:59:59.000Z

78

Radiological characterization of Yankee Nuclear Power Station  

SciTech Connect

The Yankee nuclear power station located in Rowe, Massachusetts, permanently ceased power operations on February 26, 1992, after 31 yr of operation. Yankee has since initiated decommissioning planning activities. A significant component of these activities is the determination of the extent of radiological contamination of the Yankee site. This paper describes the site radiological characterization program that has been implemented for decommissioning the Yankee plant. Radiological scoping surveys were completed to support submittal of a decommissioning plan to the U.S. Nuclear Regulatory Commission (NRC) by October 1, 1993. These surveys were designed to provide sufficient detail to estimate the extent of contamination, volume of radiological waste, activity of radiological waste, and personnel dose estimates for removal activities. Surveys were conducted both inside and on the grounds outside of the Yankee plant buildings. Survey results were combined with analytical evaluations to characterize the Yankee site.

Bellini, F.X.; Cumming, E.R.; Hollenbeck, P. (Yankee Atomic Electric Co., Bolton, MA (United States))

1993-01-01T23:59:59.000Z

79

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes  

Science Conference Proceedings (OSTI)

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

80

Application of Mobile Agents to Robust Teleoperation of Internet Robots in Nuclear Decommissioning  

E-Print Network (OSTI)

to harness nuclear fusion for energy production. The Committee recommends $474,617,000 for fusion energy the Alcator C- Mod facility and provides only enough funding for decommissioning and existing graduate

Hu, Huosheng

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report  

SciTech Connect

With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

1995-11-01T23:59:59.000Z

82

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report  

Science Conference Proceedings (OSTI)

With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

83

Decommissioning Program  

NLE Websites -- All DOE Office Websites (Extended Search)

area. The organizations has been actively performing and supporting others in performing decommissioning of former nuclear sites. Staff members are recognized as subject matter...

84

Proceedings: Decommissioning - Plant Reconfiguration and Engineering Processes Workshop  

Science Conference Proceedings (OSTI)

EPRI's Plant Reconfiguration and Engineering Processes Workshop -- the seventh in a series -- will help utility personnel evaluate technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of plant reconfiguration and engineering processes as they relate to nuclear plant decommissioning. The information presented will help utilities assess approaches to restructuring of plant engineering processes and reconfiguration management to meet individual decommissioning pro...

2001-01-09T23:59:59.000Z

85

Status of the NRC Decommissioning Program  

Science Conference Proceedings (OSTI)

On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

2003-02-24T23:59:59.000Z

86

Nuclear power and nuclear weapons  

SciTech Connect

The proliferation of nuclear weapons and the expanded use of nuclear energy for the production of electricity and other peaceful uses are compared. The difference in technologies associated with nuclear weapons and nuclear power plants are described.

Vaughen, V.C.A.

1983-01-01T23:59:59.000Z

87

Maine Yankee Decommissioning - Experience Report: Detailed Experiences 1997-2004  

Science Conference Proceedings (OSTI)

Several U.S. nuclear power plants began the decommissioning process in the 1990s. Based on current information, it will be several years before the next group of plant licenses expires, and the plants begin decommissioning. This report provides detailed information on the decommissioning of one power reactor, Maine Yankee, in order to document their experience for future plants.

2005-05-04T23:59:59.000Z

88

The Potential for a Nuclear Renaissance: The Development of Nuclear Power Under Climate Change Mitigation Policies  

E-Print Network (OSTI)

, construction, commissioning, operation, modifications, and eventually decommissioning of a nuclear power plantA Comparison of International Regulatory Organizations and Licensing Procedures for New Nuclear the safety regulation and the licensing of new nuclear power plants. The paper considers both design safety

89

A Comparative Perspective on Reactor Decommissioning  

Science Conference Proceedings (OSTI)

A comparative perspective on decommissioning, based on facts and figures as well as the national policies, is useful in identifying mutually beneficial 'lessons learned' from various decommissioning programs. In this paper we provide such a perspective on the US and European approaches based on a review of the programmatic experience and the decommissioning projects. The European countries selected for comparison, UK, France, and Germany, have nuclear power programs comparable in size and vintage to the US program but have distinctly different policies at the federal level. The national decommissioning scene has a lot to do with how national nuclear energy policies are shaped. Substantial experience exists in all decommissioning programs and the technology is in a mature state. Substantial cost savings can result from sharing of decommissioning information, technologies and approaches among various programs. However, the Achilles' heel for the decommissioning industry remains the lack of appropriate disposal facilities for the nuclear wastes. (authors)

Devgun, J.S. [Nuclear Power Technologies, Sargent and Lundy LLC, 55 E. Monroe Street, Chicago, IL 60603 (United States); Zelmer, R. [Low-Level Radioactive Waste Management Office, Atomic Energy of Canada Limited, 1900 City Park Drive, Suite 200, Ottawa, Ontario K1J 1A3 (Canada)

2006-07-01T23:59:59.000Z

90

Assessment of foreign decommissioning technology with potential application to US decommissioning needs  

Science Conference Proceedings (OSTI)

This study was conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to identify and technically assess foreign decommissioning technology developments that may represent significant improvements over decommissioning technology currently available or under development in the United States. Technology need areas for nuclear power reactor decommissioning operations were identified and prioritized using the results of past light water reactor (LWR) decommissioning studies to quantitatively evaluate the potential for reducing cost and decommissioning worker radiation dose for each major decommissioning activity. Based on these identified needs, current foreign decommissioning technologies of potential interest to the US were identified through personal contacts and the collection and review of an extensive body of decommissioning literature. These technologies were then assessed qualitatively to evaluate their uniqueness, potential for a significant reduction in decommissioning costs and/or worker radiation dose, development status, and other factors affecting their value and applicability to US needs.

Allen, R.P.; Konzek, G.J.; Schneider, K.J.; Smith, R.I.

1987-09-01T23:59:59.000Z

91

Group Differences in Safety Climate Among Workers in the Nuclear Decommissioning and Demolition Industry in the United States.  

E-Print Network (OSTI)

??This study investigated group differences in safety climate among workers in the nuclear decommissioning and demolition (D&D) industry in the United States. The study population… (more)

Findley, Michael Everett

2004-01-01T23:59:59.000Z

92

Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Main report  

SciTech Connect

Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). The study results are presented in two volumes. Volume 1 (Main Report) contains the results in summary form.

Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

1982-03-01T23:59:59.000Z

93

Decommissioning of the Nuclear Licensed Facilities at the Fontenay aux Roses CEA Center  

SciTech Connect

This is a summary of the program for the decommissioning of all the CEA's facilities in Fontenay aux Roses. The particularity of this center is that it is located in a built-up area. Taking into account the particularities of the various buildings and the levels of radioactivity in them, it was possible to devise a coherent, optimized program for the CEA-FAR licensed nuclear facility decommissioning operations.

Jeanjacques, Michel; Piketty, Laurence; Mandard, Lionel; Pedron, Guy; Boissonneau, Jean Francois; Fouquereau, Alain; Pichereau, Eric; Lethuaire, Nathalie; Estivie, David; Binet, Cedric; Meden, Igor [Commissariat a l'Energie Atomique, Direction de l'Energie Nucleaire, Direction deleguee des Activites Nucleaires de Saclay, Departement des Reacteurs et des Services Nucleaires, Service d'Assainissement de Fontenay Aux Roses : 18, route du Panorama, BP6, 92265 Fontenay aux Roses Cedex (France)

2008-01-15T23:59:59.000Z

94

Nuclear power generation and fuel cycle report 1996  

SciTech Connect

This report presents the current status and projections through 2015 of nuclear capacity, generation, and fuel cycle requirements for all countries using nuclear power to generate electricity for commercial use. It also contains information and forecasts of developments in the worldwide nuclear fuel market. Long term projections of U.S. nuclear capacity, generation, and spent fuel discharges for two different scenarios through 2040 are developed. A discussion on decommissioning of nuclear power plants is included.

NONE

1996-10-01T23:59:59.000Z

95

Proceedings: EPRI/NEI Decommissioning Workshop: San Antonio, Texas, December 10-12, 1997  

Science Conference Proceedings (OSTI)

EPRI and NEI are actively engaged in providing technical support to utilities planning or involved in nuclear plant decommissioning projects. The first joint Nuclear Decommissioning Workshop provided a forum for utility representatives and selected vendors to exchange information related to decommissioning of nuclear power plants. The workshop focused on the utility experience related to major projects currently under way, technology developments and regulatory issues.

1998-02-28T23:59:59.000Z

96

Technology, safety, and costs of decommissioning reference nuclear research and test reactors: sensitivity of decommissioning radiation exposure and costs to selected parameters  

Science Conference Proceedings (OSTI)

Additional analyses of decommissioning at the reference research and test (R and T) reactors and analyses of five recent reactor decommissionings are made that examine some parameters not covered in the initial study report (NUREG/CR-1756). The parameters examined for decommissioning are: (1) the effect on costs and radiation exposure of plant size and/or type; (2) the effects on costs of increasing disposal charges and of unavailability of waste disposal capacity at licensed waste disposal facilities; and (3) the costs of and the available alternatives for the disposal of nuclear R and T reactor fuel assemblies.

Konzek, G.J.

1983-07-01T23:59:59.000Z

97

Concrete Characterization and Dose Modeling During Plant Decommissioning  

Science Conference Proceedings (OSTI)

Several U.S. nuclear power plants entered decommissioning in the 1990's. The cost effective characterization of contaminated concrete remains a challenge for plants currently undergoing decommissioning. This report provides detailed information on projects involving the characterization, dose modeling, remediation and disposal of contaminated concrete at a number of plants undergoing decommissioning.

2008-03-31T23:59:59.000Z

98

Proceedings: EPRI International Decommissioning and Radioactive Waste Workshop at Dounreay  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI international workshop on decommissioning and radioactive waste management. EPRI initiated this continuing workshop series to aid utility personnel in assessing the technologies utilized in the decommissioning of nuclear power plants and facilities. The information presented will help individual utilities assess the benefits of the various programs, including their potential to reduce decommissioning costs.

2003-01-29T23:59:59.000Z

99

Decommissioning Handbook  

Science Conference Proceedings (OSTI)

The Decommissioning Handbook is a technical guide for the decommissioning of nuclear facilities. The decommissioning of a nuclear facility involves the removal of the radioactive and, for practical reasons, hazardous materials to enable the facility to be released and not represent a further risk to human health and the environment. This handbook identifies and technologies and techniques that will accomplish these objectives. The emphasis in this handbook is on characterization; waste treatment; decontamination; dismantling, segmenting, demolition; and remote technologies. Other aspects that are discussed in some detail include the regulations governing decommissioning, worker and environmental protection, and packaging and transportation of the waste materials. The handbook describes in general terms the overall decommissioning project, including planning, cost estimating, and operating practices that would ease preparation of the Decommissioning Plan and the decommissioning itself. The reader is referred to other documents for more detailed information. This Decommissioning Handbook has been prepared by Enserch Environmental Corporation for the US Department of Energy and is a complete restructuring of the original handbook developed in 1980 by Nuclear Energy Services. The significant changes between the two documents are the addition of current and the deletion of obsolete technologies and the addition of chapters on project planning and the Decommissioning Plan, regulatory requirements, characterization, remote technology, and packaging and transportation of the waste materials.

Not Available

1994-03-01T23:59:59.000Z

100

Criticality safety aspects of decontamination and decommissioning at defense nuclear facilities  

SciTech Connect

Defense nuclear facilities have operated for forty years with a well-defined mission to produce weapons components for the nation. With the end of the cold war, the facilities` missions have changed to one of decontamination and decommissioning. Off-normal operations and use of new procedures, such as will exist during these activities, have often been among the causal factors in previous criticality accidents at process facilities. This paper explores the similarities in causal factors in previous criticality accidents to the conditions existing in current defense nuclear facilities undergoing the transition to decontamination and decommissioning. Practices to reduce the risk to workers, the public, and the environment are recommended.

Croucher, D.W.

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Remediation of Embedded Piping: Trojan Nuclear Plant Decommissioning Experience  

Science Conference Proceedings (OSTI)

Characterization, decontamination, survey, and/or removal of contaminated embedded piping can have a substantial financial impact on decommissioning projects, depending on the project approach. This report presents a discussion of the Trojan Embedded Pipe Remediation Project (EPRP) activities, including categorization and characterization of affected piping, modeling for the proposed contamination acceptance criteria, and evaluations of various decontamination and survey techniques. The report also descr...

2000-10-19T23:59:59.000Z

102

Substantial Variability Exists in Utilities' Nuclear Decommissioning Funding Adequacy: Baseline Trends (1997-2001); and Scenario and Sensitivity Analyses (Year 2001)  

SciTech Connect

This paper explores the trends over 1997-2001 in my baseline simulation analysis of the sufficiency of electric utilities' funds to eventually decommission the nation's nuclear power plants. Further, for 2001, I describe the utilities' funding adequacy results obtained using scenario and sensitivity analyses, respectively. In this paper, I focus more on the wide variability observed in these adequacy measures among utilities than on the results for the ''average'' utility in the nuclear industry. Only individual utilities, not average utilities -- often used by the nuclear industry to represent its funding adequacy -- will decommission their nuclear plants. Industry-wide results tend to mask the varied results for individual utilities. This paper shows that over 1997-2001, the variability of my baseline decommissioning funding adequacy measures (in percentages) for both utility fund balances and current contributions has remained very large, reflected in the sizable ranges and frequency distributions of these percentages. The relevance of this variability for nuclear decommissioning funding adequacy is, of course, focused more on those utilities that show below ideal balances and contribution levels. Looking backward, 42 of 67 utility fund (available) balances, in 2001, were above (and 25 below) their ideal baseline levels; in 1997, 42 of 76 were above (and 34 below) ideal levels. Of these, many utility balances were far above, and many far below, such ideal levels. The problem of certain utilities continuing to show balances much below ideal persists even with increases in the adequacy of ''average'' utility balances.

Williams, D. G.

2003-02-26T23:59:59.000Z

103

Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Appendices  

SciTech Connect

Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and EMTOMB (entombment). The study results are presented in two volumes. Volume 2 (Appendices) contains the detailed data that support the results given in Volume 1, including unit-component data.

Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

1982-03-01T23:59:59.000Z

104

Groundwater and Soil Remediation Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Groundwater and Soil Remediation Guidelines provides the nuclear power industry with technical guidance for evaluating the need for and timing of remediation of soil and/or groundwater contamination from onsite leaks, spills, or inadvertent releases to a) prevent migration of licensed material off-site and b) minimize decommissioning impacts.

2010-12-21T23:59:59.000Z

105

2003 NEI/EPRI Decommissioning Forum  

Science Conference Proceedings (OSTI)

The NEI/EPRI Decommissioning Forum provides a comprehensive overview of the challenges facing the industry in the completion of the nuclear power plant life cycle. This report presents the proceedings of the NEI/EPRI 2003 Decommissioning Forum, which focused on license termination, material clearance values, funding, and final site release requirements.

2003-07-28T23:59:59.000Z

106

Graphite Decommissioning  

Science Conference Proceedings (OSTI)

Many of the international participants in the EPRI Decommissioning Technology Program use graphite as a moderator material in their gas cooled reactors. This report reviews the current options for the management and disposal of irradiated nuclear graphite following the decommissioning of these nuclear installations. It also discusses specific issues associated with the disposal of graphite, and outlines innovative options for recycling or reusing products formed from the irradiated material.

2006-03-03T23:59:59.000Z

107

Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities  

E-Print Network (OSTI)

1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

108

Nuclear Fusion Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Nuclear fusion reactors, if they can be made to work, promise virtually unlimited power for the indefinite future. This is because the fuel, isotopes of hydrogen, are...

109

Environment, Food and Rural Affairs (Defra) and the Nuclear Decommissioning Authority (NDA)  

E-Print Network (OSTI)

Decommissioning Authority (NDA) have commissioned the 2007 UK Radioactive Waste Inventory (2007 Inventory) to provide information on the status of radioactive waste at 1 April 2007 and forecasts of future arisings in the UK. Its aim is to provide comprehensive and up-to-date data in an open and transparent manner for those interested in radioactive waste issues. It is part of an ongoing programme of research jointly conducted by Defra and NDA. Waste volumes are given for the UK as a whole, for each type of waste producing activity and for each of the main organisations producing wastes. The report also presents information on the radioactivity and the material content of the wastes. The report includes high, intermediate and low level wastes produced from uranium enrichment, nuclear fuel manufacture, nuclear power production, spent fuel reprocessing, research and development, medical and industrial sources and defence activities. The assumptions used in the forecasts of future waste arisings are presented and discussed. Also the waste quantities in the present Inventory are compared with corresponding information from previous inventories and any differences are explained.

Pöyry Energy Limited Preface

2008-01-01T23:59:59.000Z

110

Nuclear Power and the Environment  

Reports and Publications (EIA)

This Nuclear Issue Paper discusses Nuclear Plant Wastes, Interactions of Fossil Fuel and Nuclear Power Waste Decisions, and the Environmental Position of Nuclear Power.

2013-05-30T23:59:59.000Z

111

Decommissioning Pre-Planning Manual  

Science Conference Proceedings (OSTI)

Utility experiences in recent years show that significant cost savings will result from advance planning for the eventual closure of nuclear power plants. This report provides a framework for planning ahead for plant decommissioning by drawing upon the experiences of utilities currently involved in decommissioning. It identifies important advance planning decisions, tasks, and contributing disciplines, establishes activity precedence relationships, and defines data requirements. The report also describes...

2001-11-05T23:59:59.000Z

112

Long term control of 3D engineering data for nuclear power plants  

Science Conference Proceedings (OSTI)

The engineering of the next generation of nuclear power plants requires to take into account the whole plant lifecycle: engineering, building, operating, maintaining and decommissioning. Satisfying stronger and stronger safety regulations requires the ...

Thomas Paviot; Christophe Mouton; Samir Lamouri

2013-06-01T23:59:59.000Z

113

Development of a safety assessment approach for decontamination and decommissioning operations at nuclear facilities  

SciTech Connect

The US Department of Energy (DOE) is responsible for nearly 1000 nuclear facilities which will eventually be decommissioned. In order to ensure that the health and safety of the workers, other personnel on site and the public in general is maintained during decontamination and decommissioning (D&D) operations, a methodology specifically for use in evaluating the nuclear safety of the associated activities is being developed within the Department. This methodology represents not so much a departure from that currently fish in the DOE when conducting safety assessments of operations at nuclear facilities but, rather, a formalization of those methods specifically adapted to the D&D activities. As such, it is intended to provide the safety assessment personnel with a framework on which they can base their technical judgement, to assure a consistent approach to safety assessment of D&D operations and to facilitate the systematic collection of data from facilities in the post-operational part of the life cycle.

Worthington, P.R. [USDOE, Washington, DC (United States); Cowgill, M.G. [Brookhaven National Lab., Upton, NY (United States)

1994-12-31T23:59:59.000Z

114

Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities  

E-Print Network (OSTI)

1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

115

Updates to the U.S. Nuclear Regulatory Commission's Consolidated NMSS Decommissioning Guidance  

Science Conference Proceedings (OSTI)

In September 2003, U.S. Nuclear Regulatory Commission (NRC) staff in the Office of Nuclear Material Safety and Safeguards (NMSS) consolidated and updated the policies and guidance of its decommissioning program in a three-volume NUREG report, NUREG-1757, 'Consolidated NMSS Decommissioning Guidance' [1,2,3]. This NUREG report provides guidance on: planning and implementing license termination under the NRC's License Termination Rule (LTR), in 10 CFR Part 20, Subpart E; complying with the radiological criteria for license termination; and complying with the requirements for financial assurance and record-keeping for decommissioning and timeliness in decommissioning of materials facilities. The staff plans to periodically update NUREG-1757, so that it reflects current NRC decommissioning policy. In September 2005, the staff issued, for public comment, draft Supplement 1 to NUREG-1757 [4], which contains proposed updates to the three volumes of NUREG-1757. Draft Supplement 1 includes new and revised decommissioning guidance that addresses some of the LTR implementation issues, which were analyzed by the staff in two Commission papers (SECY-03-0069, Results of the LTR Analysis [5]; and SECY-04-0035, Results of the LTR Analysis of the Use of Intentional Mixing of Contaminated Soil [6]). These issues include restricted use and institutional controls, onsite disposal of radioactive materials under 10 CFR 20.2002, selection and justification of exposure scenarios based on reasonably foreseeable future land use (realistic scenarios), intentional mixing of contaminated soil, and removal of material after license termination (a follow-up to the LTR Analysis issue on the relationship between the LTR and the current case-by-case approach for release of solid materials). The staff also developed new and revised guidance on other issues, including the risk-informed graded approach for engineered barriers. This paper is a follow-up to a poster session and paper at Waste Management 2004, which presented the new Consolidated NMSS Decommissioning Guidance in NUREG-1757. This paper discusses the issues addressed in the current update to NRC's decommissioning guidance and explores the relationships between the issues. (authors)

Banovac, K.L.; Johnson, R.L.; Schmidt, D.W. [U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

116

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report  

SciTech Connect

The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

117

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

SciTech Connect

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices and technologies

None

2004-03-01T23:59:59.000Z

118

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecti...

2004-04-13T23:59:59.000Z

119

Decommissioning: License Termination and Final Site Release: Proceedings of EPRI Technical Workshop, October 2001  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop on decommissioning license termination and final site release. The workshop was the eighth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of license termination and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices an...

2002-02-08T23:59:59.000Z

120

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

Select, Sandbox, Open Discussion Regarding Materials for Nuclear Power ... Nuclear Power Background, Trends in Nuclear Power, The Nuclear Fuel Cycle ...

122

Clearance Levels For Redundant Material From Decommissioning Of Nuclear Facilities  

E-Print Network (OSTI)

Currently, a great deal is happening in the regulatory field regarding the release of radiologically contaminated material: . The IAEA is working on the revision of Safety Series 89 (governing the principles of exemption and clearance) and of the TECDOC 855 on clearance levels. . The European Commission Directive on basic safety standards for protection against ionizing radiation in both nuclear and non-nuclear industries will become effective in May 2000. . The U.S. NRC has issued its draft on clearance of material from nuclear facilities (NUREG 1640), as well as an "issues" paper on the release of solid materials. The U.S. State Department has launched an International Radioactive Source Management Initiative, one of the objectives being to "develop international standards and guidelines and `harmonize' U.S. and IAEA radioactive clearance levels." Of great significance to the implementor of clearance regulations in the nuclear industry is the emergence of the NORM issue durin...

Shankar Menon Program; Shankar Menon

2000-01-01T23:59:59.000Z

123

Trojan PWR Decommissioning: Large Component Removal Project  

Science Conference Proceedings (OSTI)

While the decommissioning of large commercial nuclear plants in the United States is in its infancy, the technical challenges with associated radioactive waste management are clear. This report describes the removal and disposal of four steam generators and one pressurizer from the Trojan nuclear power plant, the first large PWR to be decommissioned in the United States. The report chronicles the problems, successes, and lessons learned in this project, which was completed on schedule and under budget in...

1997-09-29T23:59:59.000Z

124

Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography  

SciTech Connect

This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

Faust, R.A.; Fore, C.S.; Knox, N.P.

1980-09-01T23:59:59.000Z

125

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

126

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report  

SciTech Connect

The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

127

Climate Change, Nuclear Power and Nuclear  

E-Print Network (OSTI)

Climate Change, Nuclear Power and Nuclear Proliferation: Magnitude Matters Rob Goldston MIT IAP biomass wind hydro coal CCS coal nat gas CCS nat gas nuclear Gen IV nuclear Gen III nuclear Gen II 5-1 Electricity Generation: CCS and Nuclear Power Technology Options Available Global Electricity Generation WRE

128

COSTS OF NUCLEAR POWER  

SciTech Connect

The discussion on the costs of nuclear power from stationary plants, designed primarily for the generation of electricity. deals with those plants in operation, being built, or being designed for construction at an early date. An attempt is made to consider the power costs on the basis of consistent definitions and assumptions for the various nuclear plants and for comparable fossil-fuel plants. Information on several new power reactor projects is included. (auth)

1961-01-01T23:59:59.000Z

129

Powering the Nuclear Navy | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

The National Nuclear Security Administration Powering the Nuclear Navy Home > Our Mission > Powering the Nuclear Navy Powering the Nuclear Navy The Naval Nuclear Propulsion Program...

130

ASSURING THE AVAILABILITY OF FUNDS FOR DECOMMISSIONING NUCLEAR REACTORS  

E-Print Network (OSTI)

This regulatory guide is being issued in draft form to involve the public in the early stages of the development of a regulatory position in this area. It has not received complete staff review or approval and does not represent an official NRC staff position. Public comments are being solicited on this draft guide (including any implementation schedule) and its associated regulatory analysis or value/impact statement. Comments should be accompanied by appropriate supporting data. Written comments may be submitted to the Rules and Directives Branch, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Comments may be submitted electronically or downloaded through the NRC’s interactive web site at through Rulemaking. Copies of comments received may be examined at the NRC Public

Contact B. J. Richter; B. Discussion

2001-01-01T23:59:59.000Z

131

Commercial nuclear power 1990  

Science Conference Proceedings (OSTI)

This report presents the status at the end of 1989 and the outlook for commercial nuclear capacity and generation for all countries in the world with free market economies (FME). The report provides documentation of the US nuclear capacity and generation projections through 2030. The long-term projections of US nuclear capacity and generation are provided to the US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) for use in estimating nuclear waste fund revenues and to aid in planning the disposal of nuclear waste. These projections also support the Energy Information Administration's annual report, Domestic Uranium Mining and Milling Industry: Viability Assessment, and are provided to the Organization for Economic Cooperation and Development. The foreign nuclear capacity projections are used by the DOE uranium enrichment program in assessing potential markets for future enrichment contracts. The two major sections of this report discuss US and foreign commercial nuclear power. The US section (Chapters 2 and 3) deals with (1) the status of nuclear power as of the end of 1989; (2) projections of nuclear capacity and generation at 5-year intervals from 1990 through 2030; and (3) a discussion of institutional and technical issues that affect nuclear power. The nuclear capacity projections are discussed in terms of two projection periods: the intermediate term through 2010 and the long term through 2030. A No New Orders case is presented for each of the projection periods, as well as Lower Reference and Upper Reference cases. 5 figs., 30 tabs.

Not Available

1990-09-28T23:59:59.000Z

132

Decommissioning Experiences and Lessons Learned: Decommissioning Costs  

Science Conference Proceedings (OSTI)

In 1995, the United States (US) Nuclear Regulatory Commission (NRC) issued revised decommissioning regulations that provided a dose-based site release limit and detailed supporting regulatory guidance. This report summarizes the decommissioning cost experiences at US nuclear plants, including information about radwaste volumes and the cost of radwaste disposal based on the current regulatory situation in the US.

2011-11-29T23:59:59.000Z

133

Proceedings: Decommissioning, Decontamination, ALARA, and Worker Safety Workshop  

Science Conference Proceedings (OSTI)

This workshop on decontamination, ALARA, and worker safety was the sixth in a series initiated by EPRI to aid utility personnel in assessing the technologies for decommissioning nuclear power plants. The workshop focused on specific aspects of decommissioning related to the management of worker radiation exposure and safety. The information presented will help individual utilities assess benefits of programs in these areas for their projects, including their potential to reduce decommissioning costs.

None

2000-09-01T23:59:59.000Z

134

Proceedings: Decommissioning, Decontamination, ALARA, and Worker Safety Workshop  

Science Conference Proceedings (OSTI)

This workshop on decontamination, ALARA, and worker safety was the sixth in a series initiated by EPRI to aid utility personnel in assessing the technologies for decommissioning nuclear power plants. The workshop focused on specific aspects of decommissioning related to the management of worker radiation exposure and safety. The information presented will help individual utilities assess benefits of programs in these areas for their projects, including their potential to reduce decommissioning costs.

2000-09-07T23:59:59.000Z

135

ASTM STANDARD GUIDE FOR EVALUATING DISPOSAL OPTIONS FOR REUSE OF CONCRETE FROM NUCLEAR FACILITY DECOMMISSIONING  

SciTech Connect

Within the nuclear industry, many contaminated facilities that require decommissioning contain huge volumes of concrete. This concrete is generally disposed of as low-level waste at a high cost. Much of the concrete is lightly contaminated and could be reused as roadbed, fill material, or aggregate for new concrete, thus saving millions of dollars. However, because of the possibility of volumetric contamination and the lack of a method to evaluate the risks and costs of reusing concrete, reuse is rarely considered. To address this problem, Argonne National Laboratory-East (ANL-E) and the Idaho National Engineering and Environmental Laboratory teamed to write a ''concrete protocol'' to help evaluate the ramifications of reusing concrete within the U.S. Department of Energy (DOE). This document, titled the Protocol for Development of Authorized Release Limits for Concrete at U.S. Department of Energy Site (1) is based on ANL-E's previously developed scrap metal recycle protocols; on the 10-step method outlined in DOE's draft handbook, Controlling Release for Reuse or Recycle of Property Containing Residual Radioactive Material (2); and on DOE Order 4500.5, Radiation Protection of the Public and the Environment (3). The DOE concrete protocol was the basis for the ASTM Standard Guide for Evaluating Disposal Options for Concrete from Nuclear Facility Decommissioning, which was written to make the information available to a wider audience outside DOE. The resulting ASTM Standard Guide is a more concise version that can be used by the nuclear industry worldwide to evaluate the risks and costs of reusing concrete from nuclear facility decommissioning. The bulk of the ASTM Standard Guide focuses on evaluating the dose and cost for each disposal option. The user calculates these from the detailed formulas and tabulated data provided, then compares the dose and cost for each disposal option to select the best option that meets regulatory requirements. With this information, the reuse of concrete may be possible, thus reducing dose and decontamination and decommissioning costs. This paper outlines ten steps required to release concrete for reuse and discusses the disposal options covered in the ASTM Standard Guide.

Phillips, Ann Marie; Meservey, Richard H.

2003-02-27T23:59:59.000Z

136

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2  

SciTech Connect

On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

1994-09-01T23:59:59.000Z

137

NUCLEAR POWER PLANT  

DOE Patents (OSTI)

A nuclear power plant for use in an airless environment or other environment in which cooling is difficult is described. The power plant includes a boiling mercury reactor, a mercury--vapor turbine in direct cycle therewith, and a radiator for condensing mercury vapor. (AEC)

Carter, J.C.; Armstrong, R.H.; Janicke, M.J.

1963-05-14T23:59:59.000Z

138

Decommissioning handbook  

SciTech Connect

This document is a compilation of information pertinent to the decommissioning of surplus nuclear facilities. This handbook is intended to describe all stages of the decommissioning process including selection of the end product, estimation of the radioactive inventory, estimation of occupational exposures, description of the state-of-the-art in re decontamination, remote csposition of wastes, and estimation of program costs. Presentation of state-of-the-art technology and data related to decommissioning will aid in consistent and efficient program planning and performance. Particular attention is focused on available technology applicable to those decommissioning activities that have not been accomplished before, such as remote segmenting and handling of highly activated 1100 MW(e) light water reactor vessel internals and thick-walled reactor vessels. A summary of available information associated with the planning and estimating of a decommissioning program is also presented. Summarized in particular are the methodologies associated with the calculation and measurement of activated material inventory, distribution, and surface dose level, system contamination inventory and distribution, and work area dose levels. Cost estimating techniques are also presented and the manner in which to account for variations in labor costs as impacting labor-intensive work activities is explained.

Manion, W.J.; LaGuardia, T.S.

1980-11-01T23:59:59.000Z

139

Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography  

Science Conference Proceedings (OSTI)

This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1985-09-01T23:59:59.000Z

140

Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8  

SciTech Connect

The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1987-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5  

SciTech Connect

This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

1984-09-01T23:59:59.000Z

142

Nuclear Power in France Beyond the Myth  

E-Print Network (OSTI)

.8 Decommissioning E.2 Unsealed Nuclear Substances E.2.1 Nuclear Substance Lab Facilities E.3 Precautions Safety Officer C.4 Director of EH&S C.5 Project Directors C.6 Nuclear Substance Users D Radiation Safety Policies 13 D.1 ALARA Statement D.2 Policies ALARA Policy Laboratory Status Transfer/Shipment of Nuclear

Laughlin, Robert B.

143

Decommissioning Pre-Planning Manual: Interim Report  

Science Conference Proceedings (OSTI)

This EPRI Interim Technical Report provides a framework for pre-planning for the decommissioning of a nuclear power plant. It identifies important planning decisions, tasks, and contributing disciplines, establishes activity precedence relationships and defines data requirements. The report identifies actions that utilities can take now to ease the transition to decommissioning status, and will be of value to utilities planning plant closures in the future.

2000-11-08T23:59:59.000Z

144

Nuclear Rocket Test Facility Decommissioning Including Controlled Explosive Demolition of a Neutron-Activated Shield Wall  

SciTech Connect

Located in Area 25 of the Nevada Test Site, the Test Cell A Facility was used in the 1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program. The facility was decontaminated and decommissioned (D&D) in 2005 using the Streamlined Approach For Environmental Restoration (SAFER) process, under the Federal Facilities Agreement and Consent Order (FFACO). Utilities and process piping were verified void of contents, hazardous materials were removed, concrete with removable contamination decontaminated, large sections mechanically demolished, and the remaining five-foot, five-inch thick radiologically-activated reinforced concrete shield wall demolished using open-air controlled explosive demolition (CED). CED of the shield wall was closely monitored and resulted in no radiological exposure or atmospheric release.

Michael Kruzic

2007-09-01T23:59:59.000Z

145

The Financing of Decommissioning - A View on Legal Aspects in the European Union  

Science Conference Proceedings (OSTI)

In the future, an increasing number of nuclear power plants will be definitively closed and undergoing decommissioning. Realising the inseparable connection between the safe performance of decommissioning activities and its financing, the European Union is concerned about the availability of sufficient financial means for carrying out the decommissioning process by the time they are needed. Analysing which measures have been taken by the EU to ensure and harmonise the financing of decommissioning, the author illustrates the draft directives of the European Commission known as the 'nuclear package', which contain rules regarding the funding of decommissioning. In this context, he also descends to the envisaged Commission's analysis about the various concepts established in the Member States with respect to financing the decommissioning of nuclear facilities. The author comes to the conclusion that the EU has taken first initiatives to promote a transparent and harmonised system of regulations and standards concerning the financing of decommissioning across the Union. (author)

Fillbrandt, M. [Gesellschaft fiir Anlagen- und Reaktorsicherheit (GRS) mbH, Schwertnergasse 1, 50667 Cologne (Germany)

2006-07-01T23:59:59.000Z

146

Lesson 7 - Waste from Nuclear Power Plants | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 - Waste from Nuclear Power Plants 7 - Waste from Nuclear Power Plants Lesson 7 - Waste from Nuclear Power Plants This lesson takes a look at the waste from electricity production at nuclear power plants. It considers the different types of waste generated, as well as how we deal with each type of waste. Specific topics covered include: Nuclear Waste Some radioactive Types of radioactive waste Low-level waste High-level waste Disposal and storage Low-level waste disposal Spent fuel storage Waste isolation Reprocessing Decommissioning Lesson 7 - Waste.pptx More Documents & Publications National Report Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Third National Report for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

147

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Main report, draft report for comment. Volume 1  

Science Conference Proceedings (OSTI)

On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

1994-09-01T23:59:59.000Z

148

Determining Yankee Nuclear Power Station neutron activation  

Science Conference Proceedings (OSTI)

The Yankee nuclear power station located in Rowe, Massachusetts, permanently ceased power operations on February 26, 1992, after 31 yr of operation. Yankee has since initiated decommissioning planning activities. A significant component of these activities is a determination of the extent of radiological contamination of the Yankee site. Included in this effort was determination of the extent of neutron activation of plant components. This paper describes the determination of the neutron activation of the Yankee reactor vessel, associated internals, and surrounding structures. The Yankee reactor vessel is a 600-MW(thermal) stainless steel-lined, carbon steel vessel with stainless steel internal components designed by Westinghouse. The reactor vessel is surrounded and supported by a carbon steel neutron shield tank that was filled with chromated water during plant operation. A 5-ft-thick concrete biological shield wall surrounds the neutron shield tank. A project is under way to remove the reactor vessel internals from the reactor vessel.

Heider, K.J.; Morrissey, K.J. (Yankee Atomic Electric Co., Bolton, MA (United States))

1993-01-01T23:59:59.000Z

149

The future of nuclear power  

SciTech Connect

Present conditions and future prospects for the nuclear power industry in the United States are discussed. The presentation includes a review of trends in electrical production, the safety of coal as compared to nuclear generating plants, the dangers of radiation, the economics of nuclear power, the high cost of nuclear power in the United States, and the public fear of nuclear power. 20 refs. (DWL)

Zeile, H.J.

1987-01-01T23:59:59.000Z

150

REVIEW OF INDUSTRIES AND GOVERNMENT AGENCIES FOR TECHNOLOGIES APPLICABLE TO DEACTIVATION AND DECOMMISSIONING OF NUCLEAR WEAPONS FACILITIES  

Science Conference Proceedings (OSTI)

The Deactivation and Decommissioning Focus Area's (DDFA's) mission is to develop, demonstrate, and deploy improved deactivation and decommissioning (D&D) technologies. This mission requires that emphasis be continually placed on identifying technologies currently employed or under development in other nuclear as well as nonnuclear industries and government agencies. In support of DDFA efforts to clean up the U.S. Department of Energy's (DOE's) radiologically contaminated surplus facilities using technologies that improve worker safety, reduce costs, and accelerate cleanup schedules, a study was conducted to identify innovative technologies developed for use in nonnuclear arenas that are appropriate for D&D applications.

Reilkoff, T. E.; Hetland, M. D.; O'Leary, E. M.

2002-02-25T23:59:59.000Z

151

Executive Director for Operations INFORMATION PAPER ON THE VIABILITY OF ENTOMBMENT AS A DECOMMISSIONING OPTION FOR POWER REACTORS  

E-Print Network (OSTI)

To inform the Commission of the staff’s assessment of the viability of the entombment option for decommissioning power reactors. BACKGROUND: This paper is in response to a Staff Requirements Memorandum (SRM) on SECY-96-068 that addressed Direction Setting Issue (DSI-24) on decommissioning power reactors. The April 3, 1997, SRM requested an analysis from the staff on whether they view entombment as a viable option for decommissioning power reactors and how the Commission has dealt with previous licensee entombment option requests. The SRM stated that if the staff concludes that entombment is not a viable option, the staff should describe the technical requirements and regulatory actions that would be necessary for entombment to become a viable option for decommissioning. Further, the staff analysis should include an analysis of the resources involved, potential savings on decommissioning costs, and vulnerabilities. SECY 98-099, dated May 4, 1998, contains a status report of the staff’s review. That report summarized the present NRC regulatory position and requirements about the use of the entombment option. Based on a preliminary assessment of the efforts of Pacific Northwest

William D. Travers /s

1999-01-01T23:59:59.000Z

152

An Integrated Approach To Decommissioning Radwaste Management: The Beginning  

E-Print Network (OSTI)

In the near future, Russia will be forced to start large-scale decommissioning programs embracing nuclear submarines, nuclear power plants, defense and nuclear fuel cycle (NFC) facilities, and numerous research reactors (RR). In this situation any attempt to promote D&D programs has the utmost importance. These obvious considerations stimulated the participation of the St. Petersburg Institute of Technology in the IAEA CRP on Decommissioning Techniques for Research Reactors with the project entitled "Decontamination and Waste Management in the Course of Research Reactors Decommissioning." The aims of the present study were the following: to estimate waste arising from RR decommissioning; to gather and evaluate information on decontamination and radioactive waste management techniques and materials recycling methods applicable for decommissioning purposes; and to develop a computerized multicriteria decision-making tool for determination of the appropriateness of various techniques ...

Victor Tsvetkov Sergey; Sergey A. Medvedev; Sergey K. Neljubov

2000-01-01T23:59:59.000Z

153

Fuel availability in nuclear power.  

E-Print Network (OSTI)

?? Nuclear power is in focus of attention due to several factors these days and the expression “nuclear renaissance” is getting well known. However, concerned… (more)

Söderlund, Karl

2009-01-01T23:59:59.000Z

154

Georgia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

155

Arkansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

156

Iowa Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Iowa nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

157

Ohio Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Ohio nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

158

Vermont Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

159

Florida Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Florida nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

160

Virginia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Missouri Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

162

Nebraska Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Nebraska nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

163

Tennessee Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

164

Minnesota Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Minnesota nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

165

Arizona Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

166

Massachusetts Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

167

Kansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Kansas nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

168

Alabama Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

169

Wisconsin Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Wisconsin nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

170

Texas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

171

Michigan Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

172

Designing decommissioning into new reactor designs  

SciTech Connect

One of the lessons learned from decommissioning of existing reactors has been that decommissioning was not given much thought when these reactors were designed some three or four decades ago. Recently, the nuclear power has seen a worldwide resurgence and many new advanced reactor designs are either on the market or nearing design completion. Most of these designs are evolutionary in nature and build on the existing and proven technologies. They also incorporate many improvements and take advantage of the substantial operating experience. Nevertheless, by and large, the main factors driving the design of new reactors are the safety features, safeguards considerations, and the economic factors. With a large decommissioning experience that already exists in the nuclear industry, and with average decommissioning costs at around six hundred million dollars for each reactor in today's dollars, it is necessary that decommissioning factors also be considered as a part of the early design effort. Even though decommissioning may be sixty years down the road from the time they go on line, it is only prudent that new designs be optimized for eventual decommissioning, along with the other major considerations. (authors)

Devgun, J.S.; CHMM, Ph.D. [Nuclear Power Technologies, Sargent and Lundy LLC, Chicago, IL (United States)

2007-07-01T23:59:59.000Z

173

Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9  

SciTech Connect

The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

1988-09-01T23:59:59.000Z

174

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes  

SciTech Connect

This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

NONE

1997-09-01T23:59:59.000Z

175

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4  

Science Conference Proceedings (OSTI)

This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

1983-09-01T23:59:59.000Z

176

Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9  

SciTech Connect

The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

1988-09-01T23:59:59.000Z

177

3-D Model for Deactivation & Decommissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-D Model for Deactivation & Decommissioning 3-D Model for Deactivation & Decommissioning 3-D Model for Deactivation & Decommissioning The design and production of 3-D scale models that replicate the highly contaminated structures within the nuclear facility would provide a significant improvement in visualization of the work space, which would give managers and supervisors a more powerful tool for planning and communicating safety issues and work sequences to personnel executing the physical D&D tasks. 3-D Model for Deactivation & Decommissioning More Documents & Publications D&D Toolbox Robotic Deployment of High Resolution Laser Imaging for Characterization D&D and Risk Assessment Tools 3-D Model for Deactivation & Decommissioning Deactivation & Decommissioning Knowledge Management Information Tool (D&D

178

Radionuclides in United States commercial nuclear power reactors  

SciTech Connect

In the next ten to twenty years, many of the commercial nuclear power reactors in the United States will be reaching their projected lifetime of forty years. As these power plants are decommissioned, it seems prudent to consider the recycling of structural materials such as stainless steel. Some of these materials and components have become radioactive through either nuclear activation of the elements within the components or surface contamination with radioactivity form the operational activities. In order to understand the problems associated with recycling stainless steel from decommissioned nuclear power reactors, it is necessary to have information on the radionuclides expected on or in the contaminated materials. A study has been conducted of radionuclide contamination information that is available for commercial nuclear power reactors in the United States. There are two types of nuclear power reactors in commercial use in the United States, pressurized water reactors (PWRs) and boiling water reactors (BWRs). Before presenting radionuclide activities information, a brief discussion is given on the major components and operational differences for the PWRs and BWRs. Radionuclide contamination information is presented from 11 PWRs and over 8 BWRs. These data include both the radionuclides within the circulating reactor coolant water as well as radionuclide contamination on and within component parts.

Bechtold, T.E. [ed.] [Westinghouse Idaho Nuclear Co., Inc., Idaho Falls, ID (United States); Dyer, N.C. [Oregon Graduate Inst. of Science and Technology, Beaverton, OR (United States)

1994-01-01T23:59:59.000Z

179

Groundwater and Soil Remediation Guidelines for Nuclear Power Plants: Public Edition  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Groundwater and Soil Remediation Guidelines provides the nuclear power industry with technical guidance for evaluating the need for and timing of remediation of soil and/or groundwater contamination from onsite leaks, spills, or inadvertent releases to a) prevent migration of licensed material off-site and b) minimize decommissioning impacts.

2011-07-08T23:59:59.000Z

180

Nuclear power and nuclear-weapons proliferation  

SciTech Connect

The danger that fissile isotopes may be diverted from nuclear power production to the construction of nuclear weapons would be aggravated by a switch to the plutonium breeder: but future uranium supplies are uncertain.

Moniz, E.J.; Neff, T.L.

1978-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Maryland Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

of State nuclear net generation (percent)","Owner" "Calvert Cliffs Nuclear Power Plant Unit 1, Unit 2","1,705","13,994",100.0,"Calvert Cliffs Nuclear PP Inc" "1 Plant 2...

182

Nuclear Power Advisory Meeting  

Science Conference Proceedings (OSTI)

This document combines the material previously included in the Instrumentation and Control (I&C) Briefing Book for the Nuclear Power Advisory Meeting (Electric Power Research Institute report 1023444) with the annual I&C Research Plan, replacing the latter document. This document contains key information on the I&C program and its projects, including: 1. A program executive summarya high-level document on the key activities of the I&C base program as well as its three supplemental groups 2. A consolidate...

2012-01-19T23:59:59.000Z

183

NUCLEAR BATTERY POWERED TIMERS  

SciTech Connect

During the period from May 1957 to July 1958, four nuclear batiery powered timers were fabricated and tested from two basic designs in the time ranges of onesecond, three-second, annd half-hour intervals. The timers were temperature-tested over a range of -65 to +165 F with accuracics over this temperature range from plus or minus 10 perceat to plus or minus 15 percent. Each unit has a volume of 10 cubic inches, and the timer can be initiated either by an explosive squib or a pull-out wire. At the end of the timing interval, the timer has ann output of 30,000 ergs. The cost of the program was ,000. From the results of this development program, it appears quite feasible to build operable nuclear battery powered timers on a production basis. (auth)

DesJardin, R.L.

1958-09-19T23:59:59.000Z

184

Materials for Nuclear Power: Digital Resource Center - BOOK ... - TMS  

Science Conference Proceedings (OSTI)

Jun 22, 2007 ... Topic Title: BOOK: Scientific Basis for Nuclear Waste Management XXVII ... as papers on waste-, tank- and site-cleanup and decommissioning.

185

Materials for Nuclear Power: Digital Resource Center - WEB ... - TMS  

Science Conference Proceedings (OSTI)

May 15, 2007 ... This concise online guide to the nuclear fuel cycle offers a good overview of waste management and decommissioning processes. It is written ...

186

Massachusetts Nuclear Profile - Pilgrim Nuclear Power Station  

U.S. Energy Information Administration (EIA) Indexed Site

Pilgrim Nuclear Power Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer cpacity factor (percent)","Type","Commercial operation date","License...

187

A REVIEW OF LIGHT-WATER REACTOR SAFETY STUDIES. VOLUME 3 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

Nuclear Power Reactors PROTECTION AGAINST SABOTAGE Protection Against Industrial Sabotage I1C-4 Decominarion and Decommissioning

Nero, A.V.

2010-01-01T23:59:59.000Z

188

Illinois Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois nuclear power plants, summer capacity and net generation, 2010" Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Braidwood Generation Station Unit 1, Unit 2","2,330","19,200",20.0,"Exelon Nuclear" "Byron Generating Station Unit 1, Unit 2","2,300","19,856",20.6,"Exelon Nuclear" "Clinton Power Station Unit 1","1,065","8,612",9.0,"Exelon Nuclear" "Dresden Generating Station Unit 2, Unit 3","1,734","14,593",15.2,"Exelon Nuclear" "LaSalle Generating Station

189

Decommissioning Nuclear Facilities: First lessons Learned from UP1, Marcoule, France  

Science Conference Proceedings (OSTI)

On September 30, 1997, UP1, Marcoule Fuel reprocessing facility, dissolved its last spent Fuel rod. Final shutdown and stage 1 decommissioning began immediately after, under the supervision of CODEM , a consortium composed of The French Atomic Energy Commission, COGEMA, France fuel Cycle Company and EDF, the French Electricity Utility. The goal of the decommissioning program was to achieve stage 2 decommissioning , as per IAEA standards, within a period of about 15 years. 10 years later, a significant amount of decontamination and decommissioning works has been conducted with success. The contractual structure under which the program was launched has been profoundly modified, and the capacity of The French Atomic Energy Commission (CEA) and AREVA NC to complete full decommissioning programs has been confirmed. In the present document, we propose to examine the main aspects involved in the management of such decommissioning programs, and highlight, with significant examples, the main lessons learnt. In conclusion: As of 2007, UP1 decommissioning program proves to be a success. The choice of early decommissioning, the partnership launched between the French Atomic Energy Commission as owner of the site and decommissioning fund, with AREVA NC as operator and main contractor of the decommissioning works has been a success. The French Atomic Energy commission organized a contractual framework ensuring optimal safety conditions and work completion, while AREVA NC gained a unique experience at balancing the various aspects involved in the conduction of complete decommissioning programs. Although such a framework may not be applicable to all situations and facilities, it provides a positive example of a partnership combining institutional regulations and industrial efficiency.

Chabeuf, Jean-Michel; Boya, Didier [AREVA, AREVA NC Marcoule, 30130 Bagnols sur Ceze (France); CEA, Marcoule, 30130 Bagnols sur Ceze (France)

2008-01-15T23:59:59.000Z

190

Proceedings: 9th EPRI International Decommissioning and Radioactive Waste Workshop  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) held the 9th EPRI International Decommissioning and Radioactive Waste Workshop in collaboration with Enresa on November 2-4, 2010 in Madrid, Spain. A parallel session with EU CARBOWASTE focused on technologies and methodologies for management of graphite wastes. The Workshop featured a visit to the Jose Cabrera Nuclear Power Plant, which is presently undergoing decommissioning. This proceedings document contains the abstracts and presentation slides from the p...

2011-09-14T23:59:59.000Z

191

Technology, safety and costs of decommissioning a reference boiling water reactor power station. Appendices. Volume 2  

SciTech Connect

Appendices are presented concerning the evaluations of decommissioning financing alternatives; reference site description; reference BWR facility description; radiation dose rate and concrete surface contamination data; radionuclide inventories; public radiation dose models and calculated maximum annual doses; decommissioning methods; generic decommissioning information; immediate dismantlement details; passive safe storage, continuing care, and deferred dismantlement details; entombment details; demolition and site restoration details; cost estimating bases; public radiological safety assessment details; and details of alternate study bases.

Oak, H.D.; Holter, G.M.; Kennedy, W.E. Jr.; Konzek, G.J.

1980-06-01T23:59:59.000Z

192

The Decontamination and Decommissioning Science  

E-Print Network (OSTI)

4.1.4 NUCLEAR SUBSTANCE ROOM DECOMMISSIONING FORM The permit holder shall ensure that prior to decommissioning any area, room or enclosure where the permitted activity has been conducted: non: ________________________________________________________________________ ________________________________________________________________________ #12;Contamination Monitoring Results Provide a floor plan of the lab/area to be decommissioned

Kemner, Ken

193

HOMOGENEOUS NUCLEAR POWER REACTOR  

DOE Patents (OSTI)

A homogeneous nuclear power reactor utilizing forced circulation of the liquid fuel is described. The reactor does not require fuel handling outside of the reactor vessel during any normal operation including complete shutdown to room temperature, the reactor being selfregulating under extreme operating conditions and controlled by the thermal expansion of the liquid fuel. The liquid fuel utilized is a uranium, phosphoric acid, and water solution which requires no gus exhaust system or independent gas recombining system, thereby eliminating the handling of radioiytic gas.

King, L.D.P.

1959-09-01T23:59:59.000Z

194

International Working Group Meeting Focuses on Nuclear Power Infrastructure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Needs International Working Group Meeting Focuses on Nuclear Power Infrastructure Development and Needs June 2, 2010 - 12:02pm Addthis VIENNA, Austria - The multi-nation Infrastructure Development Working Group (IDWG) of the Global Nuclear Energy Partnership (GNEP) held its sixth meeting on May 26-27, 2010, in Vienna, Austria. The two-day event included workshops on nuclear energy regulatory agency engagement and the infrastructure needs for international nuclear fuel service frameworks. Officials from the U.S. Department of Energy (DOE) and the U.K. Nuclear Decommissioning Authority co-chaired the working group meeting. "As a key component of the international Global Nuclear Energy Partnership program, the Infrastructure Development Working Group focuses

195

FOR NUCLEAR POWER PLANTS DURING DECOMMISSIONING AND PERMANENT SHUTDOWN  

E-Print Network (OSTI)

This guide has been developed to describe methods acceptable to the NRC staff for complying with the NRC’s regulations regarding fire protection programs for licensees who have certified that their plants have permanently ceased operations and that the fuel has been permanently removed from the reactor vessels.

A. Introduction

2001-01-01T23:59:59.000Z

196

Yankee Rowe Decommissioning Experience Record: Volume 1  

Science Conference Proceedings (OSTI)

This report describes Yankee Atomic's experiences in the process of decommissioning the Yankee Rowe nuclear power plant. This volume presents lessons learned during work finished by September 1997. A second volume, to be published in 1998, will complete the experience record. The recommendations and insights in this report will be valuable to other utilities with permanently shutdown plants.

1997-12-31T23:59:59.000Z

197

Jose Cabrera Nuclear Power Plant Full System Chemical Decontamination Experience Report  

Science Conference Proceedings (OSTI)

Chemical decontamination is one of the key challenging tasks of decommissioning a nuclear power plant. This report describes a full system chemical decontamination at SpainJosCabrera Nuclear Power Plant that sought to facilitate future dismantling by removing contamination and lowering radiation fields. Because of several unique features of the JosCabrera decontamination project, it has provided new good practices and useful lessons learned.

2009-11-17T23:59:59.000Z

198

Standard Guide for Evaluating Disposal Options for Concrete from Nuclear Facility Decommissioning  

E-Print Network (OSTI)

1.1 This standard guide defines the process for developing a strategy for dispositioning concrete from nuclear facility decommissioning. It outlines a 10-step method to evaluate disposal options for radioactively contaminated concrete. One of the steps is to complete a detailed analysis of the cost and dose to nonradiation workers (the public); the methodology and supporting data to perform this analysis are detailed in the appendices. The resulting data can be used to balance dose and cost and select the best disposal option. These data, which establish a technical basis to apply to release the concrete, can be used in several ways: (1) to show that the release meets existing release criteria, (2) to establish a basis to request release of the concrete on a case-by-case basis, (3) to develop a basis for establishing release criteria where none exists. 1.2 This standard guide is based on the “Protocol for Development of Authorized Release Limits for Concrete at U.S. Department of Energy Sites,” (1) from ...

American Society for Testing and Materials. Philadelphia

2002-01-01T23:59:59.000Z

199

Louisiana Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant NameTotal Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

200

Long-Term Planning for Nuclear Energy Systems Under Deep Uncertainty  

E-Print Network (OSTI)

scientific resources for decommissioning a nuclear facility.t) i Decommissioning Decommissioning of a nuclear facilityDecommissioning Funding: Ethics, Implementa- tion, Uncertainties. Nuclear

Kim, Lance Kyungwoo

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

A review of decommissioning considerations for new reactors  

Science Conference Proceedings (OSTI)

At a time of 'nuclear renaissance' when the focus is on advanced reactor designs and construction, it is easy to overlook the decommissioning considerations because such a stage in the life of the new reactors will be some sixty years down the road. Yet, one of the lessons learned from major decommissioning projects has been that decommissioning was not given much thought when these reactors were designed three or four decades ago. Hence, the time to examine what decommissioning considerations should be taken into account is right from the design stage with regular updates of the decommissioning strategy and plans throughout the life cycle of the reactor. Designing D and D into the new reactor designs is necessary to ensure that the tail end costs of the nuclear power are manageable. Such considerations during the design stage will facilitate a more cost-effective, safe and timely decommissioning of the facility when a reactor is eventually retired. This paper examines the current regulatory and industry design guidance for the new reactors with respect to the decommissioning issues and provides a review of the design considerations that can help optimize the reactor designs for the eventual decommissioning. (authors)

Devgun, J.S.Ph.D. [Manager Nuclear Power Technologies, Sargent and Lundy LLC, Chicago, IL (United States)

2008-07-01T23:59:59.000Z

202

Washington Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Washington nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

203

Connecticut Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Connecticut nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

204

California Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

California nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

205

Mississippi Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Mississippi nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

206

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program  

SciTech Connect

This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

207

NEW POSITIONS AT THE NEA DRAFT DESCRIPTIONS 1-Nuclear Safety Specialist Grade A3  

E-Print Network (OSTI)

, operation, uranium mining and milling, and plant decommissioning. 2. The nuclear power lifecycle Engineers.5. Decommissioning The last stage of the nuclear lifecycle involves the decom- missioning and dismantling Japanese nuclear reactors Frontend 17 24.2 Construction 2.8 Operation 3.2 Backend 0.8 Decommissioning 0

Papadopoulos, Evangelos

208

The Decline and Death of Nuclear Power  

E-Print Network (OSTI)

measures founder and a nuclear reactor does fail, theafter that, the first nuclear reactor, Chicago Pile-1, wentword “nuclear” can be. Nuclear reactors in power plants are

Melville, Jonathan

2013-01-01T23:59:59.000Z

209

Technology, safety and costs of decommissioning a reference boiling water reactor power station. Volume 2. Appendices. Technical report, September 1977-October 1979  

SciTech Connect

Technology, safety and cost information is given for the conceptual decommissioning of a large (1100MWe) boiling water reactor (BWR) power station. Three approaches to decommissioning, immediate dismantlement, safe storage with deferred dismantlement and entombment, were studied to obtain comparisons between costs, occupational radiation doses, potential dose to the public and other safety impacts. It also shows the sensitivity of decommissioning safety and costs to the power rating of a BWR in the range of 200 to 1100 MWE. This volume contains the appendices.

Oak, H.D.; Holter, G.M.; Kennedy, W.E. Jr.; Konzek, G.J.

1980-06-01T23:59:59.000Z

210

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

211

Quarterly Nuclear Power Deployment Scorecard - January 2013 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Deployment Scorecard - January 2013 Power Deployment Scorecard - January 2013 Quarterly Nuclear Power Deployment Scorecard - January 2013 News Updates On October 22, 2012, Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013. On November 20, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a follow-on solicitation open to other companies and manufacturers, focused

212

Competitive economics of nuclear power  

Science Conference Proceedings (OSTI)

Some 12 components of a valid study of the competitive economics of a newly ordered nuclear power plant are identified and explicated. These are then used to adjust the original cost projections of four authoritative studies of nuclear and coal power economics.

Hellman, R.

1981-03-02T23:59:59.000Z

213

Decommissioning at AWE  

Science Conference Proceedings (OSTI)

AWE (A) has been at the heart of the UK Nuclear deterrent since it was established in the early 1950's. It is a nuclear licensed site and is governed by the United Kingdoms Nuclear Installation Inspectorate (NII). AWE plc on behalf of the Ministry of Defence (MOD) manages the AWE (A) site and all undertakings including decommissioning. Therefore under NII license condition 35 'Decommissioning', AWE plc is accountable to make and implement adequate arrangements for the decommissioning of any plant or process, which may affect safety. The majority of decommissioning projects currently being undertaken are to do with Hazard category 3, 4 or 5 facilities, systems or plant that have reached the end of their operational span and have undergone Post-Operational Clean-Out (POCO). They were either built for the production of fissile components, for supporting the early reactor fuels programmes or for processing facility waste arisings. They either contain redundant contaminated gloveboxes associated process areas, process plant or systems or a combination of all. In parallel with decommissioning project AWE (A) are undertaking investigation into new technologies to aid decommissioning projects; to remove the operative from hands on operations; to develop and implement modifications to existing process and techniques used. AWE (A) is currently going thorough a sustained phase of upgrading its facilities to enhance its scientific capability, with older facilities, systems and plant being replaced, making decommissioning a growth area. It is therefore important to the company to reduce these hazards progressively and safety over the coming years, making decommissioning an important feature of the overall legacy management aspects of AWE PLC's business. This paper outlines the current undertakings and progress of Nuclear decommissioning on the AWE (A) site. (authors)

Biles, K.; Hedges, M.; Campbell, C

2008-07-01T23:59:59.000Z

214

Nuclear power plant design analysis  

SciTech Connect

Information concerning the engineering aspects of the design of commercial nuclear power plants is presented. Topics discussed include: electric utility economics; nuclear plant cconomics; thermal-transport systems and core design; nuclear analysis methods; safcty requirements; fuel-system analysis; dcsign considerations; and optimization approaches. (DCC)

Sesonske, A.

1973-01-01T23:59:59.000Z

215

Trojan Nuclear Plant Decommissioning: Final Survey for the Independent Spent Fuel Storage Installation Site  

Science Conference Proceedings (OSTI)

This report describes the final radiological survey for the area where Portland General Electric (PGE) will construct the Independent Spent Fuel Storage Installation (ISFSI) at Trojan nuclear power plant. The survey fulfills the requirements for release of this area from Trojan's 10 CFR 50 license before radiation levels increase with spent fuel storage in the ISFSI.

1998-05-13T23:59:59.000Z

216

SOME RECENT TECHNOLOGY DEVELOPMENTS FROM THE UK'S NATIONAL NUCLEAR LABORATORY TO ENABLE HAZARD CHARACTERISATION FOR NUCLEAR DECOMMISSIONING APPLICATIONS  

SciTech Connect

Under its programme of self investment Internal Research and Development (IR&D), the UK's National Nuclear Laboratory (NNL) is addressing the requirement for development in technology to enable hazard characterisation for nuclear decommissioning applications. Three such examples are described here: (1) RadBall developed by the NNL (patent pending) is a deployable baseball-sized radiation mapping device which can, from a single location, locate and quantify radiation hazards. RadBall offers a means to collect information regarding the magnitude and distribution of radiation in a given cell, glovebox or room to support the development of a safe, cost effective decontamination strategy. RadBall requires no electrical supplies and is relatively small, making it easy to be deployed and used to map radiation hazards in hard to reach areas. Recent work conducted in partnership with the Savannah River National Laboratory (SRNL) is presented. (2) HiRAD (patent pending) has been developed by the NNL in partnership with Tracerco Ltd (UK). HiRAD is a real-time, remotely deployed, radiation detection device designed to operate in elevated levels of radiation (i.e. thousands and tens of thousands of Gray) as seen in parts of the nuclear industry. Like the RadBall technology, the HiRAD system does not require any electrical components, the small dimensions and flexibility of the device allow it to be positioned in difficult to access areas (such as pipe work). HiRAD can be deployed as a single detector, a chain, or as an array giving the ability to monitor large process areas. Results during the development and deployment of the technology are presented. (3) Wireless Sensor Network is a NNL supported development project led by the University of Manchester (UK) in partnership with Oxford University (UK). The project is concerned with the development of wireless sensor network technology to enable the underwater deployment and communication of miniaturised probes allowing pond monitoring and mapping. The potential uses, within the nuclear sector alone, are both numerous and significant in terms of the proceeding effort to clean up the UK's nuclear waste legacy.

Farfan, E.; Foley, T.

2010-02-11T23:59:59.000Z

217

Pennsylvania Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Pennsylvania nuclear power plants, summer capacity and net generation, 2010" Pennsylvania nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Beaver Valley Unit 1, Unit 2","1,777","14,994",19.3,"FirstEnergy Nuclear Operating Company" "Limerick Unit 1, Unit 2","2,264","18,926",24.3,"Exelon Nuclear" "PPL Susquehanna Unit 1, Unit 2","2,450","18,516",23.8,"PPL Susquehanna LLC" "Peach Bottom Unit 2, Unit 3","2,244","18,759",24.1,"Exelon Nuclear" "Three Mile Island Unit 1",805,"6,634",8.5,"Exelon Nuclear"

218

Joint electric power alternatives study. Appendix G. Joint parallel nuclear alternatives study for Russia. Final report  

Science Conference Proceedings (OSTI)

The Joint Parallel Nuclear Alternatives Study for Russia (JPNAS) is a parallel study to the Joint Electric Power Alternatives Study (JEPAS). The JPNAS assessed the costs of enhancing the safety level of Russian nuclear power plants (NPPs), decommissioning of RBMK-1000 and first generation VVER-440 units, completion of NPP construction, NPP repowering into fossil fuel plants, and construction of new generation NPPs. In the framework of the JEPAS, the JPNAS provides data on the nuclear sector which is needed to formulate an integrated resources plan and schedule for investments for the development of Russia`s power sector.

NONE

1995-06-01T23:59:59.000Z

219

DECOMMISSIONING OF HOT CELL FACILITIES AT THE BATTELLE COLUMBUS LABORATORIES  

SciTech Connect

Battelle Columbus Laboratories (BCL), located in Columbus, Ohio, must complete decontamination and decommissioning activities for nuclear research buildings and grounds at its West Jefferson Facilities by 2006, as mandated by Congress. This effort includes decommissioning several hot cells located in the Hot Cell Laboratory (Building JN-1). JN-1 was originally constructed in 1955, and a hot cell/high bay addition was built in the mid 1970s. For over 30 years, BCL used these hot cell facilities to conduct research for the nuclear power industry and several government agencies, including the U.S. Navy, U.S. Army, U.S. Air Force, and the U.S. Department of Energy. As a result of this research, the JN-1 hot cells became highly contaminated with mixed fission and activation products, as well as fuel residues. In 1998, the Battelle Columbus Laboratories Decommissioning Project (BCLDP) began efforts to decommission JN-1 with the goal of remediating the site to levels of residual contamination allowing future use without radiological restrictions. This goal requires that each hot cell be decommissioned to a state where it can be safely demolished and transported to an off-site disposal facility. To achieve this, the BCLDP uses a four-step process for decommissioning each hot cell: (1) Source Term Removal; (2) Initial (i.e., remote) Decontamination; (3) Utility Removal; and (4) Final (i.e., manual) Decontamination/Stabilization. To date, this process has been successfully utilized on 13 hot cells within JN-1, with one hot cell remaining to be decommissioned. This paper will provide a case study of the hot cell decommissioning being conducted by the BCLDP. Discussed will be the methods used to achieve the goals of each of the hot cell decommissioning stages and the lessons learned that could be applied at other sites where hot cells need to be decommissioned.

Weaver, Patrick; Henderson, Glenn; Erickson, Peter; Garber, David

2003-02-27T23:59:59.000Z

220

Nuclear power. Volume 2: nuclear power project management  

Science Conference Proceedings (OSTI)

The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables.

Not Available

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The Decline and Death of Nuclear Power  

E-Print Network (OSTI)

since the Cold War, nuclear power plants are being plannedthe fuel used in nuclear power plants is almost completelya mere 43% believe that more nuclear power plants should be

Melville, Jonathan

2013-01-01T23:59:59.000Z

222

The Decline and Death of Nuclear Power  

E-Print Network (OSTI)

world-nuclear.org/info/Nuclear-Fuel-Cycle/Nuclear- Wastes/fuel sources; the fuel used in nuclear power plants isphase out both nuclear energy and fossil fuels at the same

Melville, Jonathan

2013-01-01T23:59:59.000Z

223

The Decline and Death of Nuclear Power  

E-Print Network (OSTI)

Y. , & Kitazawa, K. (2012). Fukushima in review: A complexin new nuclear power stations after Fukushima. The Guardian.nuclear-power- stations-fukushima Hvistendahl, M. (2007,

Melville, Jonathan

2013-01-01T23:59:59.000Z

224

Nuclear Energy Governance and the Politics of Social Justice: Technology, Public Goods, and Redistribution in Russia and France  

E-Print Network (OSTI)

for nuclear waste disposal and decommissioning whilethe cost of decommissioning and nuclear waste disposal on

Grigoriadis, Theocharis N

2009-01-01T23:59:59.000Z

225

Nuclear Energy Governance and the Politics of Social Justice: Technology, Public Goods, and Redistribution in Russia and France  

E-Print Network (OSTI)

nuclear waste disposal and decommissioning while underminingbetween the cost of decommissioning and nuclear waste

Grigoriadis, Theocharis N

2009-01-01T23:59:59.000Z

226

Owners of nuclear power plants  

Science Conference Proceedings (OSTI)

Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

Hudson, C.R.; White, V.S.

1996-11-01T23:59:59.000Z

227

DECOMMISSIONING DOCUMENTS Decommissioning Handbook The Decommissioning Handbook has  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DECOMMISSIONING DOCUMENTS DECOMMISSIONING DOCUMENTS Decommissioning Handbook The Decommissioning Handbook has been developed to incorporate examples and lessons learned, and to illustrate practices and procedures for implementing each step of the LCAM Decommissioning Implementation Guide. Decommissioning Benchmarking Study DOE's former Office of Environmental Restoration (EM-40) conducted a benchmarking study of its decommissioning program to analyze physical activities in facility decommissioning and to determine approaches to improve the decommissioning process. The study focused on quantifying productivity of decommissioning physical activities and identifying how productivity is affected by specific working conditions. The decommissioning benchmarking results are the foundation for several distinct products:

228

Underground collocation of nuclear power plant reactors and repository to facilitate the post-renaissance expansion of nuclear power  

SciTech Connect

Underground collocation of nuclear power reactors and the nuclear waste management facilities supporting those reactors, termed an underground nuclear park (UNP), appears to have several advantages compared to the conventional approach to siting reactors and waste management facilities. These advantages include the potential to lower reactor capital and operating cost, lower nuclear waste management cost, and increase margins of physical security and safety. Envirorunental impacts related to worker health, facility accidents, waste transportation, and sabotage and terrorism appear to be lower for UNPs compared to the current approach. In-place decommissioning ofUNP reactors appears to have cost, safety, envirorunental and waste disposal advantages. The UNP approach has the potential to lead to greater public acceptance for the deployment of new power reactors. Use of the UNP during the post-nuclear renaissance time frame has the potential to enable a greater expansion of U.S. nuclear power generation than might otherwise result. Technical and economic aspects of the UNP concept need more study to determine the viability of the concept.

Myers, Carl W [Los Alamos National Laboratory; Elkins, Ned Z [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

229

Nuclear Systems Technologies - Nuclear Engineering Division ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Departments involved: Research & Test Reactor | Engineering Development and Applications "Decommissioning of Nuclear Facilities" training courses Argonne Decommissioning Training...

230

Nuclear power to the Pacific  

SciTech Connect

The nuclear power industry is increasingly being pressured to export reactors to the Third World. The experiences of the five ASEAN (Association of Southeast Asian Nations) are recounted. To date, only the Philippine Republic has formally committed itself to a nuclear generator. The Republic lacks oil and has only limited hydroelectric potential. Its geothermal energy program is being accelerated. It appears Indonesia will be the next ASEAN country ''to go nuclear'', hoping to have a nuclear plant on-line in 1985. The island of Singapore has been voicing a desire for a nuclear power plant, but the country does not have space for a plant. The possibility of a floating station has been mentioned, but the World Bank does not finance unproved projects. Singapore could obtain an island from Indonesia or share a plant with Malaysia if a plant were built on the mainland of the Malay peninsula. The Thai Energy Generating Authority (EGAT) is preparing ''to go nuclear'' with the emergence of a stable coalition rule in Bangkok; the financial restrictions are discussed. Thailand is diligently searching for its own oil and gas. The article closes by projecting the problem that could arise with IAEA having only 40 inspectors who are charged with monitoring nuclear power plants all over the world. The authors point out that the industrial countries themselves have proved wholly incapable of monitoring their own systems. (MCW)

Wasserman, H.; Wainer, A.

1976-11-01T23:59:59.000Z

231

The Decline and Death of Nuclear Power  

E-Print Network (OSTI)

9. The Economist (2012). Nuclear power: The 30-year itch.Germany and France, the anti-nuclear movement has taken suchtime since the Cold War, nuclear power plants are being

Melville, Jonathan

2013-01-01T23:59:59.000Z

232

Nuclear Power Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Onofre Nuclear Generating Station Onofre Nuclear Generating Station San Onofre Nuclear Generating Station Bob Ashe-Everest Southern California Edison 10 Incoming New Fuel Inspecting New Fuel SONGS Unit 1 Fuel Storage SONGS Unit 1 Fuel Storage History History u Shipped 270 Fuel Assemblies (F/A) from Unit 1 to Morris, Illinois. u Transshipped 70 U1 F/As to U2 spent fuel pool (SFP). u Transshipped 118 U1 F/As to U3 SFP. SONGS ISFSI Loading SONGS ISFSI Loading u Moved 5 dry shielded canisters (DSC) from U3 SFP to the Independent Spent Fuel Storage Installation (ISFSI). Each DSC contains up to 24 F/As. u Moved 9 DSCs from U1 SFP to the ISFSI. u At total of 325 U1 F/As have been moved into dry storage to date. u Scheduled to move 3 DSCs from U2 SFP to the ISFSI May 2005. Canister into Cask FA being loaded into canister

233

Supercomputer decommissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Supercomputer decommissioning Community Connections: Our link to Northern New Mexico Communities Latest Issue:November 2013 All Issues submit Roadrunner supercomputer: Rest in...

234

Decommissioning Handbook  

Energy.gov (U.S. Department of Energy (DOE))

The Decommissioning Handbook has been developed to incorporate examples and lessons learned, and to illustrate practices and procedures for implementing each step of the LCAM Decommissioing...

235

Decommissioning Plan of the Musashi Reactor and Its Progress  

SciTech Connect

The Musashi Reactor is a TRIGA-II, tank-type research reactor, as shown in Table 1. The reactor had been operated at maximum thermal power level of 100 kW since first critical, January 30, 1963. Reactor operation was shut down due to small leakage of water from the reactor tank on December 21,1989. After shutdown, investigation of the causes, making plan of repair and discussions on restart or decommissioning had been done. Finally, decision of decommissioning was made in May, 2003. The initial plan of the decommissioning was submitted to the competent authority in January, 2004. Now, the reactor is under decommissioning. The plan of decommissioning and its progress are described. In conclusion: considering the status of undertaking plan of the waste disposal facility for the low level radioactive waste from research reactors, the phased decommissioning was selected for the Musashi Reactor. First phase of the decommissioning activities including the actions of permanent shutdown and delivering the spent nuclear fuels to US DOE was completed.

Tanzawa, Tomio [Atomic Energy Research Laboratory, Musashi Institute of Technology, Ozenji 971, Asao-ku, Kawasaki, 215-0013 (Japan)

2008-01-15T23:59:59.000Z

236

Decommissioning Standard Review Plans and Risk-Informing Decommissioning Regulation: Selected 1999 Industry/NRC Decommissioning Lice nsing Interactions  

Science Conference Proceedings (OSTI)

This report describes the technical support EPRI provided the Nuclear Energy Institute (NEI) Decommissioning Working Group in 1999. This volume includes two initiatives that produced four draft Decommissioning Standard Review Plans (DSRPs). It also includes an evaluation entitled Spent Fuel Pool Seismic Failure Frequency in Support of Risk-Informed Decommissioning -- Emergency Planning.

1999-10-31T23:59:59.000Z

237

Proceedings: 8th EPRI International Decommissioning and Radioactive Waste Management Workshop  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) collaborated with E.On Kernkraft to hold the 8th EPRI International Decommissioning and Radwaste Management Workshop in Hamburg, Germany on October 6-8, 2009. A parallel session with EU CARBOWASTE focused on technologies and methodologies for management of graphite wastes. The Workshop featured a visit to the Stade nuclear power plant, which is presently undergoing decommissioning. This proceedings document contains the abstracts and presentation slides from t...

2011-01-31T23:59:59.000Z

238

Yankee Rowe Decommissioning Experience Record: Volume 2  

Science Conference Proceedings (OSTI)

This report describes Yankee Atomic Electric Company's (YAEC) recent experiences in the process of decommissioning the Yankee Rowe nuclear power plant. This volume supplements Volume 1 by presenting more lessons learned during work finished by September 1998. In 1999, EPRI will publish a final report completing the experience record. The recommendations and insights in this report will be valuable to other utilities with permanently shut down plants.

1998-12-18T23:59:59.000Z

239

Energy and Security in Northeast Asia: Proposals for Nuclear Cooperation  

E-Print Network (OSTI)

experience in decommissioning its former nuclear-poweredfor decommissioning and decontamination of nuclear vessels.nuclear technology: design, procurement, equipment manufacturing, construction, installation, start up, operation and decommissioning.

Kaneko, Kumao; Suzuki, Atsuyuki; Choi, Jor-Shan; Fei, Edward

1998-01-01T23:59:59.000Z

240

Regulatory Reform and License Termination Planning in Decommissioning  

SciTech Connect

Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning.

Michael J. Meisner

2000-06-04T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Nuclear Energy RenaissanceNuclear Energy Renaissance National Research Council andNational Research Council and  

E-Print Network (OSTI)

. 1. HISTORY 1.1 Decommissioning of the Reactor The Gentilly-I nuclear power plant, located satisfactory for safe operation, and AECL decided to decommission it in 1978. The nuclear fuel was removedSP·215-18 FRP Retrofit of the Ring-Beam of a Nuclear Reactor Containment Structure by M. Demers. A

242

Money Related Decommissioning and Funding Decision Making  

Science Conference Proceedings (OSTI)

'Money makes the world go round', as the song says. It definitely influences decommissioning decision-making and financial assurance for future decommissioning. This paper will address two money-related decommissioning topics. The first is the evaluation of whether to continue or to halt decommissioning activities at Fermi 1. The second is maintaining adequacy of financial assurance for future decommissioning of operating plants. Decommissioning costs considerable money and costs are often higher than originally estimated. If costs increase significantly and decommissioning is not well funded, decommissioning activities may be deferred. Several decommissioning projects have been deferred when decision-makers determined future spending is preferable than current spending, or when costs have risen significantly. Decommissioning activity timing is being reevaluated for the Fermi 1 project. Assumptions for waste cost-escalation significantly impact the decision being made this year on the Fermi 1 decommissioning project. They also have a major impact on the estimated costs for decommissioning currently operating plants. Adequately funding full decommissioning during plant operation will ensure that the users who receive the benefit pay the full price of the nuclear-generated electricity. Funding throughout operation also will better ensure that money is available following shutdown to allow decommissioning to be conducted without need for additional funds.

Goodman, Lynne S. [Detroit Edison Company, 6400 N. Dixie Highway, Newport, Michigan 48162 (United States)

2008-01-15T23:59:59.000Z

243

THE ECONOMICS OF NUCLEAR POWER  

SciTech Connect

Economic aspects of nuclear power development in the U. S. are tabulated and graphed. Included are figures on presently operating reactors as well as those contemplated or scheduled. Also a brief description of the objectives of short- and long-range programs is given as well as tables listing some of the characteristics of each reactor. (J.R.D.)

Lane, J.A.

1959-04-27T23:59:59.000Z

244

Siemens Nuclear Power GmbH AREVA Nuclear Power | Open Energy...  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Siemens Nuclear Power GmbH AREVA Nuclear Power Jump to: navigation, search Name Siemens Nuclear Power...

245

North Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

246

New Hampshire Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (nw)","Net generation (thousand mwh)","Share of State nuclear net...

247

New Jersey Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

248

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

Agency regulating commercial nuclear power plants and other uses of nuclear materials, 0, 720, Lynne Robinson, 6/25/2007 9:29 AM by Lynne Robinson.

249

Nuclear power high technology colloquium: proceedings  

Science Conference Proceedings (OSTI)

Reports presenting information on technology advancements in the nuclear industry and nuclear power plant functions have been abstracted and are available on the energy data base.

Not Available

1984-12-10T23:59:59.000Z

250

Proposal For Internationally Standardized Cost Item Definitions For The Decommissioning Of Nuclear Installations  

E-Print Network (OSTI)

Various international decommissioning projects have shown that there are substantial variations in cost estimates for individual installations. Studies to understand the reasons for these differences have been somewhat hampered by the fact that different types of cost estimation methods are used, having different data requirements. Although some uncertainty is inevitable in any costing method, an understanding of the costing methods used in particular projects is useful to avoid key uncertainties. Difficulties of understanding can be encountered and invalid conclusions drawn in making cost comparisons without regard to the context in which the various cost estimates were made. The above-mentioned difficulties are partly due to the lack of a standardized or generally agreed-upon costing method that includes well-structured and defined cost items and an established estimation method. Such a structure and method would be useful not only for project cost comparisons but would also be a t...

Lucien Teunckens Belgoprocess; Kurt Pflugrad; Lucien Teunckens; Candace Chan-sands; Ted Lazo

2000-01-01T23:59:59.000Z

251

Nuclear power has a significant role in the European power ...  

U.S. Energy Information Administration (EIA)

Sales, revenue and prices, power plants, fuel use, stocks, generation, trade, demand & emissions. ... Because nuclear power does not emit greenhouse gases, ...

252

Electric Power Produced from Nuclear Reactor | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric Power Produced from Nuclear Reactor | National Nuclear Security Electric Power Produced from Nuclear Reactor | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Electric Power Produced from Nuclear Reactor Electric Power Produced from Nuclear Reactor December 20, 1951 Arco, ID Electric Power Produced from Nuclear Reactor

253

Steam Reheat in Nuclear Power Plants.  

E-Print Network (OSTI)

??In this work, reheating steam from a commercial nuclear power plant is explored in order to increase efficiency and power output. A thermal source in… (more)

Marotta, Paul John

2012-01-01T23:59:59.000Z

254

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

May 25, 2007 ... The United States Nuclear Power Industry is “reawakening”. ... for a New Generation of Power Plants", Materials Technology@TMS, May 2007.

255

Preparing for Decommissioning: The Oyster Creek Experience  

Science Conference Proceedings (OSTI)

This report chronicles the process of preparing GPU Nuclear's Oyster Creek Nuclear Generating Station for early retirement and decommissioning. The Oyster Creek experience has great relevance to the nuclear industry, as future decommissioning projects will benefit from the comprehensive preplanning work performed there.

2000-06-06T23:59:59.000Z

256

Organizational learning at nuclear power plants  

E-Print Network (OSTI)

The Nuclear Power Plant Advisory Panel on Organizational Learning provides channels of communications between the management and organization research projects of the MIT International Program for Enhanced Nuclear Power ...

Carroll, John S.

1991-01-01T23:59:59.000Z

257

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

PRESENTATONS: Reawakening of United States Nuclear Energy: Materials Challenges for a New Generation of Power Plants Presentations by Harold ...

258

Sabotage at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

Purvis, James W.

1999-07-21T23:59:59.000Z

259

Site decommissioning management plan  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission (NRC) staff has identified 48 sites contaminated with radioactive material that require special attention to ensure timely decommissioning. While none of these sites represent an immediate threat to public health and safety they have contamination that exceeds existing NRC criteria for unrestricted use. All of these sites require some degree of remediation, and several involve regulatory issues that must be addressed by the Commission before they can be released for unrestricted use and the applicable licenses terminated. This report contains the NRC staff`s strategy for addressing the technical, legal, and policy issues affecting the timely decommissioning of the 48 sites and describes the status of decommissioning activities at the sites.

Fauver, D.N.; Austin, J.H.; Johnson, T.C.; Weber, M.F.; Cardile, F.P.; Martin, D.E.; Caniano, R.J.; Kinneman, J.D.

1993-10-01T23:59:59.000Z

260

Dalhousie University Nuclear Substance (Class 7) Receiving Refresher Training  

E-Print Network (OSTI)

.fissilematerials.org). In 2006-2007 he was part of a consultant consortium that assessed nuclear decommissioning and waste 2008 main nuclear operators EDF, CEA and AREVA answered a questionnaire on decommissioning and wasteNuclear Power in France Beyond the Myth By Mycle Schneider International Consultant on Energy

Brownstone, Rob

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

NUCLEAR SCIENCE AND TECHNOLOGY DIVISION OAK RIDGE NATIONAL LABORATORY  

E-Print Network (OSTI)

, engineering, construction. operation, transmission and distribution of nuclear electricity, decommissioning from $O.Ol/kWh ($1982) at l%/yr to $O.O165/kWh in year 50, decommissioning and nuclear waste reserved Copyright 0 1988 Pergamon Journals Ltd THE NET-ENERGY YIELD OF NUCLEAR POWER GENETYNER SR,~ ROBERT

McDonald, Kirk

262

Groundwater Protection Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The nuclear power industry has entered into a voluntary initiative to implement groundwater monitoring programs at all nuclear power plant sites. This EPRI guideline provides essential technical guidance to nuclear power utilities on the necessary elements of a sound groundwater protection program.

2008-01-10T23:59:59.000Z

263

Nuclear Power PROS -`No' greenhouse gas emissions  

E-Print Network (OSTI)

Nuclear Power PROS -`No' greenhouse gas emissions -Fuel is cheep -High energy density (1 ton U = 16 abundant elements found in natural crustal rocks) Nuclear Power CONS -High capital cost due to meeting if there is a movement towards electric cars? -What if the high capital costs of a nuclear power plant were invested

Toohey, Darin W.

264

Role of nuclear power in the Philippine power development program  

SciTech Connect

The reintroduction of nuclear power in the Philippines is favored by several factors such as: the inclusion of nuclear energy in the energy sector of the science and technology agenda for national development (STAND); the Large gap between electricity demand and available local supply for the medium-term power development plan; the relatively lower health risks in nuclear power fuel cycle systems compared to the already acceptable power systems; the lower environmental impacts of nuclear power systems compared to fossil fuelled systems and the availability of a regulatory framework and trained personnel who could form a core for implementing a nuclear power program. The electricity supply gap of 9600 MW for the period 1993-2005 could be partly supplied by nuclear power. The findings of a recent study are described, as well as the issues that have to be addressed in the reintroduction of nuclear power.

Aleta, C.R. [Philippine Nuclear Research Institite, Quezon City (Philippines)

1994-12-31T23:59:59.000Z

265

QUARTERLY NUCLEAR POWER DEPLOYMENT SUMMARY OCTOBER 2013 News Updates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 News Updates ď‚« Dominion has filed an updated integrated resource plan with Virginia and North Carolina State regulators; the plan sets an "earliest possible" in- service date of October 2024 for North Anna 3. Earlier this year, the company announced its intention to return to the General Electric-Hitachi (GEH) ESBWR reactor design with an amended Combined Operating License (COL) to be filed by the end of 2013. ď‚« Entergy announced that it will close its single unit Vermont Yankee nuclear power plant in late 2014; sustained low natural gas prices, financial impacts of cumulative regulations, and the wholesale market structure all contributed to the company's decision to shutter the plant. This is the fourth plant this year to announce decommissioning plans. Dominion's closure of its single unit Kewaunee plant also followed from low wholesale

266

Related Resources - Nuclear Data Program, Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

267

Publications: Other Resources - Nuclear Data Program - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

268

Publications 2005 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

269

Publications 2003 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

270

Contacts - Nuclear Data Program, Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

271

Publications 2001 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

272

Publications 2004 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

273

Publications 2009 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

274

Nuclear Criticality Safety: Current Activities - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

275

Nuclear Criticality Safety - Nuclear Engineering Division (Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

276

Nuclear Systems Analysis - Nuclear Engineering Division (Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

277

Publications 2011 - Nuclear Data Program - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

278

Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement for Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center A Summary and Guide for Stakeholders DOE/EIS-0226-D (Revised) November 2008 The West Valley Site Availability of the Revised Draft EIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center For further information on this Draft EIS, or to request a copy please contact: Cathern Bohan, EIS Document Manager West Valley Demonstration Project U.S. Department of Energy Ashford Office Complex 9030 Route 219 West Valley, NY 14171 Telephone: 716-942-4159 Fax: 716-942-4703 E-mail: catherine.m.bohan@wv.doe.gov Printed with soy ink on recycled paper

279

Final EIS for Decommissioning and/or Long-Term Stewardship at the WVDP and Western New York Nuclear Service Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE/EIS-0226 DOE/EIS-0226 January 2010 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center A Summary and Guide for Stakeholders The West Valley Site Availability of the Final EIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center For further information on this Final EIS, or to request a copy of the EIS or references, please contact: Catherine Bohan, EIS Document Manager West Valley Demonstration Project U.S. Department of Energy Ashford Office Complex 9030 Route 219 West Valley, NY 14171 Telephone: 716-942-4159 Fax: 716-942-4703 E-mail: catherine.m.bohan@wv.doe.gov

280

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16  

SciTech Connect

This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

NONE

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9  

Science Conference Proceedings (OSTI)

This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

NONE

1997-09-01T23:59:59.000Z

282

Powering the Nuclear Navy | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Powering the Nuclear Navy Powering the Nuclear Navy Home > About Us > Our Programs > Powering the Nuclear Navy Powering the Nuclear Navy The Naval Nuclear Propulsion Program provides militarily effective nuclear propulsion plants and ensures their safe, reliable and long-lived operation. This mission requires the combination of fully trained U.S. Navy men and women with ships that excel in endurance, stealth, speed, and independence from supply chains. NNSA's Navy Reactors Program provides the design, development and operational support required to provide militarily effective nuclear propulsion plants and ensure their safe, reliable and long-lived operation. This budget requests more than $1 billion to power a modern nuclear Navy: Continuation of design and development work for the OHIO-class

283

Materials for Nuclear Power: Digital Resource Center - WEB ...  

Science Conference Proceedings (OSTI)

May 7, 2007 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear Power ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science, Nuclear ... This 'thermodynamic database for advanced nuclear fuels' was ...

284

ALARA at nuclear power plants  

SciTech Connect

Implementation of the As Low As Reasonably Achievable (ALARA) principle at nuclear power plants presents a continuing challenge for health physicists at utility corporate and plant levels, for plant designers, and for regulatory agencies. The relatively large collective doses at some plants are being addressed though a variety of dose reduction techniques. It is planned that this report will include material on historical aspects, management, valuation of dose reduction, quantitative and qualitative aspects of optimization, design, operational considerations, and training. The status of this work is summarized in this report. 30 refs., 1 fig., 6 tabs.

Baum, J.W.

1990-01-01T23:59:59.000Z

285

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors  

Science Conference Proceedings (OSTI)

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organiza

Janzen, Rick [Atomic Energy of Canada Ltd., Chalk River Laboratories, Chalk River, Ontario, K0J 1J0 (Canada)

2008-01-15T23:59:59.000Z

286

International Energy Outlook 1999 - Nuclear Power  

Gasoline and Diesel Fuel Update (EIA)

nuclear.jpg (5137 bytes) nuclear.jpg (5137 bytes) Nuclear electricity generation remains flat in the IEO99 reference case, representing a declining share of the worldÂ’s total electricity consumption. Net reductions in nuclear capacity are projected for most industrialized nations. In 1997, a total of 2,276 billion kilowatthours of electricity was generated from nuclear power worldwide, providing 17 percent of the worldÂ’s electricity generation. Among the countries with operating nuclear power plants, national dependence on nuclear power for electricity varies greatly (Figure 53). Ten countries met at least 40 percent of their total electricity demand with generation from nuclear reactors. The prospects for nuclear power to maintain a significant share of worldwide electricity generation are uncertain, despite projected growth of

287

Decontamination, decommissioning, and vendor advertorial issue, 2008  

SciTech Connect

The focus of the July-August issue is on Decontamination, decommissioning, and vendor advertorials. Articles and reports in this issue include: D and D technical paper summaries; The role of nuclear power in turbulent times, by Tom Chrisopher, AREVA, NP, Inc.; Enthusiastic about new technologies, by Jack Fuller, GE Hitachi Nuclear Energy; It's important to be good citizens, by Steve Rus, Black and Veatch Corporation; Creating Jobs in the U.S., by Guy E. Chardon, ALSTOM Power; and, and, An enviroment and a community champion, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovations article is titled Best of the best TIP achievement 2008, by Edward Conaway, STP Nuclear Operating Company.

Agnihotri, Newal (ed.)

2008-07-15T23:59:59.000Z

288

Decommissioning Regulatory Process Interactions in 2000: EPRI Support to NEI for NRC Proposed Decommissioning Rule Revision  

Science Conference Proceedings (OSTI)

This report describes the technical support EPRI provided to the Nuclear Energy Institute (NEI) Decommissioning Working Group in 2000. It includes the material supplied to the NEI for their use in generating comments on behalf of the nuclear energy industry concerning the Nuclear Regulatory Commission's (NRC) new draft regulations on decommissioning.

2000-11-03T23:59:59.000Z

289

Decommissioning Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents Decommissioning Documents Decommissioning Documents More Documents & Publications CX-002246: Categorical Exclusion Determination Decommissioning Handbook CX-003134:...

290

Decommissioning Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents Decommissioning Documents Decommissioning Documents More Documents & Publications CX-002246: Categorical Exclusion Determination Decommissioning Handbook CX-000018:...

291

The Fourth Generation of Nuclear Power  

SciTech Connect

The outlook for nuclear power in the U.S. is currently very bright. The economics, operations and safety performance of U.S. nuclear power plants is excellent. In addition, both the safety and economic regulation of nuclear power are being changed to produce better economic parameters for future nuclear plant operations and the licenses for plant operations are being extended to 60 years. There is further a growing awareness of the value of clean, emissions-free nuclear power. These parameters combine to form a firm foundation for continued successful U.S. nuclear plant operations, and even the potential In order to realize a bright future for nuclear power, we must respond successfully to five challenges: • Nuclear power must remain economically competitive, • The public must remain confident in the safety of the plants and the fuel cycle. • Nuclear wastes and spent fuel must be managed and the ultimate disposition pathways for nuclear wastes must be politically settled. • The proliferation potential of the commercial nuclear fuel cycle must continue to be minimized, and • We must assure a sustained manpower supply for the future and preserve the critical nuclear technology infrastructure. The Generation IV program is conceived to focus the efforts of the international nuclear community on responding to these challenges.

Lake, James Alan

2000-11-01T23:59:59.000Z

292

Net energy from nuclear power  

SciTech Connect

An analysis of net energy from nuclear power plants is dependent on a large number of variables and assumptions. The energy requirements as they relate to reactor type, concentration of uranium in the ore, enrichment tails assays, and possible recycle of uranium and plutonium were examined. Specifically, four reactor types were considered: pressurized water reactor, boiling water reactor, high temperature gas-cooled reactor, and heavy water reactor (CANDU). The energy requirements of systems employing both conventional (current) ores with uranium concentration of 0.176 percent and Chattanooga Shales with uranium concentration of 0.006 percent were determined. Data were given for no recycle, uranium recycle only, and uranium plus plutonium recycle. Starting with the energy requirements in the mining process and continuing through fuel reprocessing and waste storage, an evaluation of both electrical energy requirements and thermal energy requirements of each process was made. All of the energy, direct and indirect, required by the processing of uranium in order to produce electrical power was obtained by adding the quantities for the individual processes. The energy inputs required for the operation of a nuclear power system for an assumed life of approximately 30 years are tabulated for nine example cases. The input requirements were based on the production of 197,100,000 MWH(e), i.e., the operation of a 1000 MW(e) plant for 30 years with an average plant factor of 0.75. Both electrical requirements and thermal energy requirements are tabulated, and it should be emphasized that both quantities are needed. It was found that the electricity generated far exceeded the energy input requirements for all the cases considered. (auth)

Rotty, R.M.; Perry, A.M.; Reister, D.B.

1975-11-01T23:59:59.000Z

293

Maryland Nuclear Profile - Calvert Cliffs Nuclear Power Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Calvert Cliffs Nuclear Power Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

294

New York Nuclear Profile - R E Ginna Nuclear Power Plant  

U.S. Energy Information Administration (EIA) Indexed Site

R E Ginna Nuclear Power Plant" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License...

295

New York Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Indian Point Unit 2, Unit 3","2,063","16,321",39.0,"Entergy Nuclear Indian Point" "James A Fitzpatrick Unit 1",855,"6,361",15.2,"Entergy Nuc Fitzpatrick LLC" "Nine Mile Point Nuclear Station Unit 1, Unit 2","1,773","14,239",34.0,"Nine Mile Point Nuclear Sta LLC" "R E Ginna Nuclear Power Plant Unit 1",581,"4,948",11.8,"R.E. Ginna Nuclear Power Plant, LLC" "4 Plants

296

Nuclear power plants: structure and function  

SciTech Connect

Topics discussed include: steam electric plants; BWR type reactors; PWR type reactors; thermal efficiency of light water reactors; other types of nuclear power plants; the fission process and nuclear fuel; fission products and reactor afterheat; and reactor safety.

Hendrie, J.M.

1983-01-01T23:59:59.000Z

297

Nuclear power plant construction activity, 1988  

SciTech Connect

Nuclear Power Plant Construction Activity 1988 presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1988. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1989-06-14T23:59:59.000Z

298

Materials for Nuclear Power: Digital Resource Center - REPORT ...  

Science Conference Proceedings (OSTI)

Feb 12, 2007... Nuclear Power Background, Trends in Nuclear Power, The Nuclear ... Science: Application to Fusion and Generation IV Fission Reactors

299

Resergence of U.S. Nuclear Power  

SciTech Connect

Over the past quarter century, things have not gone well for the nuclear industry. First came the Three Mile Island accident in America in 1979, then the disaster at the Chernobyl plant in Ukraine in 1986. In Japan, Tokyo Electric Power, the world's largest private electricity company, shut its 17 nuclear reactors after it was caught falsifying safety records to hide cracks at some of its plants in 2002. In addition, the attacks on September 11, 2001 were a sharp reminder that the risks of nuclear power generation were not only those inherent in the technology. But lately, prospects have brightened for the nuclear industry. Nuclear power is an important source of electricity in many countries. In 2003, 19 countries depended on nuclear power for at least 20 percent of their electricity generation. As of March 2005, there were 441 nuclear power reactors in operation around the world, and another 25 were under construction. Five new nuclear power plants began operation in 2004 - one each in China, Japan, and Russia and two in Ukraine. In addition, Canada?s Bruce 3 reactor was reconnected to the grid. Five nuclear power plants were permanently shut down in 2004 - one in Lithuania and four in the United Kingdom. Nuclear power is expected to see a revival in the next decade given the availability of uranium and the prospect of emission-free power generation, Also, with conventional energy sources such as oil and gas likely to see severe depletion over the next 30 years, the price of conventional power generation is set to rise significantly, which would put nuclear power generation in focus again. The report provides an overview of the opportunities for nuclear power in the U.S. electric industry and gives a concise look at the challenges faced by nuclear power, the ability of advanced nuclear reactors to address these challenges, and the current state of nuclear power generation. Topics covered in the report include: an overview of U.S. Nuclear Power including its history, the current market environment, and the future of nuclear power in the U.S.; an analysis of the key business factors that are driving renewed interest in nuclear power; an analysis of the barriers that are hindering the implementation of new nuclear power plants; a description of nuclear power technology including existing reactors, as well as 3rd and 4th generation reactor designs; a review of the economics of new nuclear power projects and comparison to other generation alternatives; a discussion of the key government initiatives supporting nuclear power development; profiles of the key reactor manufacturers participating in the U.S. nuclear power market; and, profiles of the leading U.S. utilities participating in the U.S. nuclear power market.

none

2006-02-15T23:59:59.000Z

300

Decommissioning Technology Experience Reports  

Science Conference Proceedings (OSTI)

This report presents four summary reports on field applications and demonstration tests of several nuclear plant deactivation and decommissioning (D&D) technologies. Specifically presented are findings from: (1) concrete decontamination technology tests at Rancho Seco; (2) a large bore piping decontamination and characterization demonstration at Big Rock Point; (3) gamma ray imaging for D&D applications; and (4) novel techniques for large tank and vessel removal at Trojan and Rancho Seco.

2000-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Materials in Nuclear Power Plant Construction - TMS  

Science Conference Proceedings (OSTI)

139th Annual Meeting & Exhibition. February 14 - 18, 2010, Washington State Convention Center, Seattle, Washington USA. Materials in Nuclear Power. Plant  ...

302

Laser Welding for Nuclear Power Systems  

Science Conference Proceedings (OSTI)

Enhancement of Intergranular Corrosion Resistance of TIG Welded and Laser- surface Melted SUS 304 for Nuclear Power Plants · Evaluation of Nanofeature ...

303

Materials for Nuclear Power: Digital Resource Center ...  

Science Conference Proceedings (OSTI)

Mar 5, 2008 ... An overview presentation covering drivers for the Nuclear Renaissance and the path forward for nucleaer power in the United States.

304

Nickel Alloys Used in Nuclear Power Systems  

Science Conference Proceedings (OSTI)

Abstract Scope, Nickel based alloys are used extensively in nuclear power ... of Zircaloy Liquidus and Solidus with an Instrumented Transvarestraint Test.

305

Materials for Nuclear Power – A Brief Introduction  

Science Conference Proceedings (OSTI)

Feb 10, 2007 ... A brief introduction to the effects of irradiation on materials for the nuclear power industry. PDF article includes figures and useful links.

306

Decommissioning and Safety Issues of Liquid-Mercury Waste Generated from High-Power Spallation Sources with Particle Accelerators  

Science Conference Proceedings (OSTI)

Neutron Data / Special Issue on the 11th International Conference on Radiation Shielding and the 15th Topical Meeting of the Radiation Protection and Shielding Division (Part 2) / Decontamination/Decommissioning

S. Chiriki; J. Fachinger; R. Moormann; H.-K. Hinssen; A. Bukaemskiy; R. Odoj

307

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

(NRC) staff responses to frequently asked questions on the decommissioning process for commercial, nuclear power reactors. The questions were taken from a variety of sources over the past several years, including written inquiries to the NRC and questions asked at public meetings and during informal discussions with the NRC staff. In responding to the questions, the NRC staff attempted to provide the answers in a clear and non-technical form. With the increase in the number of power reactors beginning the decommissioning process and significant changes that occurred in the regulations since 1996, the staff realized that there was a general lack of understanding of the decommissioning process and the risks associated with decommissioning. This document was developed in response to the staff’s concerns. The report contains a definition of decommissioning and a discussion of alternatives. It also provides a focus on decommissioning experiences in the United States and how the NRC regulates the decommissioning process. Questions related to spent fuel, low-level waste, and transportation related to decommissioning are answered. Questions related to license termination, the ultimate disposition of the facility, and finances for completing decommissioning and hazards associated with decommissioning are also addressed. This document also provides responses to questions related to public involvement in decommissioning as well as providing the public with sources for obtaining additional information on decommissioning.

John L Minns; Michael T. Masnik; U. S. Nuclear; Regulatory Commission; Washington D. C. Abstract

2000-01-01T23:59:59.000Z

308

Nuclear Power - Deployment, Operation and Sustainability  

E-Print Network (OSTI)

We are fortunate to live in incredibly exciting and incredibly challenging time. Energy demands due to economic growth and increasing population must be satisfied in a sustainable manner assuring inherent safety, efficiency and no or minimized environmental impact. These considerations are among the reasons that lead to serious interest in deploying nuclear power as a sustainable energy source. At the same time, catastrophic earthquake and tsunami events in Japan resulted in the nuclear accident that forced us to rethink our approach to nuclear safety, design requirements and facilitated growing interests in advanced nuclear energy systems. This book is one in a series of books on nuclear power published by InTech. It consists of six major sections housing twenty chapters on topics from the key subject areas pertinent to successful development, deployment and operation of nuclear power systems worldwide. The book targets everyone as its potential readership groups - students, researchers and practitioners - who are interested to learn about nuclear power.

Tsvetkov, Pavel

2011-09-01T23:59:59.000Z

309

Materials for Nuclear Power: Digital Resource Center - WEBCAST ...  

Science Conference Proceedings (OSTI)

May 25, 2007 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ...

310

Materials for Nuclear Power: Digital Resource Center - WEB ...  

Science Conference Proceedings (OSTI)

Feb 12, 2007 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ...

311

Materials for Nuclear Power: Digital Resource Center - JOM Article ...  

Science Conference Proceedings (OSTI)

Mar 15, 2009 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ...

312

Materials for Nuclear Power: Digital Resource Center - BOOK ...  

Science Conference Proceedings (OSTI)

Feb 12, 2007 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ...

313

Materials for Nuclear Power: Digital Resource Center - What long ...  

Science Conference Proceedings (OSTI)

Jan 4, 2008 ... Select, Sandbox, Open Discussion Regarding Materials for Nuclear ... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ...

314

Nuclear power and nuclear-weapons proliferation  

SciTech Connect

Concern over the risk of nuclear proliferation has led to extensive reexamination of the technical, economic, and political assumptions underlying both national and international nuclear policies. An attempt is made in the present article to clarify the basic technical and political issues. The connections between various fuel cycles and their possible proliferation risks are discussed. As the resolution of the existing differing views on proliferation risks will be largely a political process, solutions to the problem are not proposed. (JSR)

Moniz, E.J.; Neff, T.L.

1978-04-01T23:59:59.000Z

315

Proceedings: 1998 EPRI/NEI Decommissioning Technology Workshop: Monterey, California, December 7-9, 1998  

Science Conference Proceedings (OSTI)

EPRI and NEI provide technical and regulatory support to utilities planning or involved in nuclear plant decommissioning projects. The second joint Decommissioning Technology Workshop provided the opportunity for utility representatives and selected vendors to exchange information related to nuclear plant decommissioning projects. The workshop focused on recent utility decommissioning experience, technological developments and regulatory updates.

1999-02-08T23:59:59.000Z

316

POWER SUPPLY EXPANSION AND THE NUCLEAR OPTION  

E-Print Network (OSTI)

the fact that eventually thermal plant is duplicated by CO -2 free nuclear power. Similarly), Autoproducing Power Plants in Poland: Technological Data, Warsaw 1993b. ______, Public Thermal Power Plants% of all generating capacity, 5.6 GW, is combined heat and power (CHP), or cogeneration, plant, which also

317

Update on the Cost of Nuclear Power  

E-Print Network (OSTI)

We update the cost of nuclear power as calculated in the MIT (2003) Future of Nuclear Power study. Our main focus is on the changing cost of construction of new plants. The MIT (2003) study provided useful data on the cost ...

Parsons, John E.

2009-01-01T23:59:59.000Z

318

Nuclear Power Plant Concrete Structures  

Science Conference Proceedings (OSTI)

A nuclear power plant (NPP) involves complex engineering structures that are significant items of the structures, systems and components (SSC) important to the safe and reliable operation of the NPP. Concrete is the commonly used civil engineering construction material in the nuclear industry because of a number of advantageous properties. The NPP concrete structures underwent a great degree of evolution, since the commissioning of first NPP in early 1960. The increasing concern with time related to safety of the public and environment, and degradation of concrete structures due to ageing related phenomena are the driving forces for such evolution. The concrete technology underwent rapid development with the advent of chemical admixtures of plasticizer/super plasticizer category as well as viscosity modifiers and mineral admixtures like fly ash and silica fume. Application of high performance concrete (HPC) developed with chemical and mineral admixtures has been witnessed in the construction of NPP structures. Along with the beneficial effect, the use of admixtures in concrete has posed a number of challenges as well in design and construction. This along with the prospect of continuing operation beyond design life, especially after 60 years, the impact of extreme natural events ( as in the case of Fukushima NPP accident) and human induced events (e.g. commercial aircraft crash like the event of September 11th 2001) has led to further development in the area of NPP concrete structures. The present paper aims at providing an account of evolution of NPP concrete structures in last two decades by summarizing the development in the areas of concrete technology, design methodology and construction techniques, maintenance and ageing management of concrete structures.

Basu, Prabir [International Atomic Energy Agency (IAEA)] [International Atomic Energy Agency (IAEA); Labbe, Pierre [Electricity of France (EDF)] [Electricity of France (EDF); Naus, Dan [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL)

2013-01-01T23:59:59.000Z

319

Materials for Nuclear Power: Digital Resource Center -- Articles and ...  

Science Conference Proceedings (OSTI)

... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science, Nuclear Engineering ... BOOK: Safety Related Issues of Spent Nuclear Fuel Storage ... A compilation of reports prepared by the Center for Nuclear Waste Regulatory ...

320

International Cooperation on Safety of Nuclear Plants - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Current R&D Activities in Nuclear Criticality Safety - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

322

NUCLEAR DATA AND MEASUREMENTS REPORTS 161-180 - Nuclear Data...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

323

Analysis Tools for Nuclear Criticality Safety - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

324

Organization - Nuclear Engineering Division (Argonne)  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

325

Achievements: Nuclear Engineering Division (Argonne)  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

326

International Energy Outlook 2000 - Nuclear Power  

Gasoline and Diesel Fuel Update (EIA)

In the IEO2000 reference case, nuclear power represents a declining share of the worldÂ’s total electricity consumption from 1997 through 2020. Plant retirements are expected to produce net reductions in nuclear capacity in most of the industrialized nations. In the IEO2000 reference case, nuclear power represents a declining share of the worldÂ’s total electricity consumption from 1997 through 2020. Plant retirements are expected to produce net reductions in nuclear capacity in most of the industrialized nations. In 1998, a total of 2,291 billion kilowatthours of electricity was generated by nuclear power worldwide, providing 16 percent of the worldÂ’s total generation[1]. Among the countries with operating nuclear power plants, national dependence on nuclear energy for electricity varies greatly. Nine countries met at least 40 percent of total electricity demand with generation from nuclear reactors. Figure 68. Nuclear Shares of National Electricity Generation, 1998 [Sources] The prospects for nuclear power to maintain a significant share of

327

Proceedings of the US Nuclear Regulatory Commission fifteenth water reactor safety information meeting: Volume 6, Decontamination and decommissioning, accident management, TMI-2  

SciTech Connect

This six-volume report contains 140 papers out of the 164 that were presented at the Fifteenth Water Reactor Safety Information Meeting held at the National Bureau of Standards, Gaithersburg, Maryland, during the week of October 26-29, 1987. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. This report, Volume 6, discusses decontamination and decommissioning, accident management, and the Three Mile Island-2 reactor accident. Thirteen reports have been cataloged separately.

Weiss, A. J. [comp.

1988-02-01T23:59:59.000Z

328

State of the art review of radioactive waste volume reduction techniques for commercial nuclear power plants  

Science Conference Proceedings (OSTI)

A review is made of the state of the art of volume reduction techniques for low level liquid and solid radioactive wastes produced as a result of: (1) operation of commercial nuclear power plants, (2) storage of spent fuel in away-from-reactor facilities, and (3) decontamination/decommissioning of commercial nuclear power plants. The types of wastes and their chemical, physical, and radiological characteristics are identified. Methods used by industry for processing radioactive wastes are reviewed and compared to the new techniques for processing and reducing the volume of radioactive wastes. A detailed system description and report on operating experiences follow for each of the new volume reduction techniques. In addition, descriptions of volume reduction methods presently under development are provided. The Appendix records data collected during site surveys of vendor facilities and operating power plants. A Bibliography is provided for each of the various volume reduction techniques discussed in the report.

Not Available

1980-04-01T23:59:59.000Z

329

Korea Hydro & Nuclear Power Co., Ltd. Nuclear Power Plants: Construction and Technology Experience  

Science Conference Proceedings (OSTI)

The Korean nuclear power industry has grown rapidly since Kori Unit 1, the first Korean nuclear power plant (NPP), which began operation in April 1978. Following the technology developments of the nuclear power industry in 1980s, the first standard Korean nuclear plants (Ulchin Units 3 and 4) were constructed in the 1990s. At present, 20 NPP units operate in Korea16 pressurized water reactor (PWR) plants and four pressurized heavy water reactor (PHWR) plants; eight PWR units are under construction. This ...

2011-09-21T23:59:59.000Z

330

Public opinion factors regarding nuclear power  

Science Conference Proceedings (OSTI)

This paper is an effort to identify, as comprehensively as possible, public concerns about nuclear power, and to assess, where possible, the relative importance of these concerns as they relate to government regulation of and policy towards nuclear power. It is based on some two dozen in-depth interviews with key communicators representing the nuclear power industry, the environmental community, and government, as well as on the parallel efforts in our research project: (1) review of federal court case law, (2) a selective examination of the Nuclear Regulatory Commission (NRC) administrative process, and (3) the preceding George Mason University research project in this series. The paper synthesizes our findings about public attitudes towards nuclear power as expressed through federal court case law, NRC administrative law, public opinion surveys, and direct personal interviews. In so doing, we describe the public opinion environment in which the nuclear regulatory process must operate. Our premise is that public opinion ultimately underlies the approaches government agencies take towards regulating nuclear power, and that, to the degree that the nuclear power industry`s practices are aligned with public opinion, a more favorable regulatory climate is possible.

Benson, B.

1991-12-31T23:59:59.000Z

331

Public opinion factors regarding nuclear power  

SciTech Connect

This paper is an effort to identify, as comprehensively as possible, public concerns about nuclear power, and to assess, where possible, the relative importance of these concerns as they relate to government regulation of and policy towards nuclear power. It is based on some two dozen in-depth interviews with key communicators representing the nuclear power industry, the environmental community, and government, as well as on the parallel efforts in our research project: (1) review of federal court case law, (2) a selective examination of the Nuclear Regulatory Commission (NRC) administrative process, and (3) the preceding George Mason University research project in this series. The paper synthesizes our findings about public attitudes towards nuclear power as expressed through federal court case law, NRC administrative law, public opinion surveys, and direct personal interviews. In so doing, we describe the public opinion environment in which the nuclear regulatory process must operate. Our premise is that public opinion ultimately underlies the approaches government agencies take towards regulating nuclear power, and that, to the degree that the nuclear power industry's practices are aligned with public opinion, a more favorable regulatory climate is possible.

Benson, B.

1991-01-01T23:59:59.000Z

332

NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES  

Science Conference Proceedings (OSTI)

For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent industrial worker exposure to radioactive or hazardous contamination exceeding Principal Threat Source Material levels; (2) Minimize human and ecological exposure to unacceptable risk associated with radiological and hazardous constituents that are or may be present; (3) Prevent to the extent practicable the migration of radioactive or hazardous contaminants from the closed facility to the groundwater so that concentrations in groundwater do not exceed regulatory standards; (4) Eliminate or control all routes of human exposure to radiological and chemical contamination; and (5) Prevent animal intruder exposure to radioactive and hazardous contamination.

Blankenship, J.; Langton, C.; Musall, J.; Griffin, W.

2012-01-18T23:59:59.000Z

333

Space nuclear power: a strategy for tomorrow  

SciTech Connect

Energy: reliable, portable, abundant and low cost will be a most critical factor, perhaps the sine qua non, for the unfolding of man's permanent presence in space. Space-based nuclear power, in turn, is a key technology for developing such space platforms and the transportation systems necessary to service them. A strategy for meeting space power requirements is the development of a 100-kW(e) nuclear reactor system for high earth orbit missions, transportation from Shuttle orbits to geosynchronous orbit, and for outer planet exploration. The component technology for this nuclear power plant is now underway at the Los Alamos National Laboratory. As permanent settlements are established on the Moon and in space, multimegawatt power plants will be needed. This would involve different technology similar to terrestrial nuclear power plants.

Buden, D.; Angelo, J. Jr.

1981-01-01T23:59:59.000Z

334

Decommissioning And Its Financing In Belgium: Better To Prevent Than To Cure  

E-Print Network (OSTI)

Since 1985 the Belgian legislature has taken measures to guarantee the financing of the ultimate life period of nuclear facilities. An agreement was concluded with the utilities for the settlement of financial provisions for the later decommissioning of all commercial nuclear power plants. In 1991, the preventive measures were extended to all other nuclear facilities in the country, including healing actions for those plants having a lack of financial provisions to carry out the later decommissioning programs, as well as plants for which the operator or owner has failed to satisfy his legal obligation to decommission the plant. In 1997, the legislature extended the precautionary measures to financing for the remediation of all sites within the country containing radioactive substances liable to present risks for the public health or for the environment. The implementation and control of the measures taken since 1991 have been entrusted by laws to ONDRAF/NIRAS. 1.0 THE EVOLUTION...

Marnix Braeckeveldt Roger; Roger Verbeke; Manfred Schrauben; Ingrid Verstraeten

2000-01-01T23:59:59.000Z

335

A Review of the Costs of Nuclear Power Michael T. Hogue, Research Analyst  

E-Print Network (OSTI)

long-term option for the future of the College's Reactor. 10. The College runs a small CONSORT nuclear reactor at Silwood Park. Ultimate responsibility for funding its end of life decommissioning currently of the liability, or postponing decommissioning by extending the life of the Reactor. The Paper proposed a method

Provancher, William

336

New York Nuclear Profile - R E Ginna Nuclear Power Plant  

U.S. Energy Information Administration (EIA)

snpt3ny6122 581 4,948 97.2 PWR R E Ginna Nuclear Power Plant Unit Summer Capacity (MW) Net Generation (Thousand MWh) Summer Capacity Factor (Percent) Type

337

Fort St. Vrain Decommissioning: Final Site Radiation Survey: Summary Report and Lessons Learned  

Science Conference Proceedings (OSTI)

This report describes the final step in the decommissioning process at Public Service Company of Colorado's (PSCo) Fort St. Vrain nuclear power plant. The final site radiation survey documents that all nuclear facility surfaces meet the established release limits for unrestricted use. The survey formed the legal basis for the termination of the Fort St. Vrain nuclear license, which occurred in August 1997. The lessons learned in this process will be valuable to other utilities with permanently shutdown p...

1998-02-13T23:59:59.000Z

338

How much electricity does a typical nuclear power plant generate ...  

U.S. Energy Information Administration (EIA)

Nuclear Reactor Operational Status Tables (Information and data on nuclear power reactors Generation: by State and Reactor. Annual Energy Review, ...

339

Workshop on nuclear power growth and nonproliferation  

Science Conference Proceedings (OSTI)

It is widely viewed that an expansion of nuclear power would have positive energy, economic and environmental benefits for the world. However, there are concerns about the economic competitiveness, safety and proliferation and terrorism risks of nuclear power. The prospects for a dramatic growth in nuclear power will depend on the ability of governments and industry to address these concerns, including the effectiveness of, and the resources devoted to, plans to develop and implement technologies and approaches that strengthen nonproliferation, nuclear materials accountability and nuclear security. In his Prague speech, President Obama stated: 'we should build a new framework for civil nuclear cooperation, including an international fuel bank, so that countries can access peaceful power without increasing the risks of proliferation. That must be the right of every nation that renounces nuclear weapons, especially developing countries embarking on peaceful programs. And no approach will succeed if it's based on the denial of rights to nations that play by the rules. We must harness the power of nuclear energy on behalf of our efforts to combat climate change, and to advance peace opportunity for all people.' How can the President's vision, which will rekindle a vigorous public debate over the future of nuclear power and its relation to proliferation, be realized? What critical issues will frame the reemerging debate? What policies must be put into place to address these issues? Will US policy be marked more by continuity or change? To address these and other questions, the Los Alamos National Laboratory in cooperation with the Woodrow Wilson International Center for Scholars will host a workshop on the future of nuclear power and nonproliferation.

Pilat, Joseph F [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

340

Nuclear Power - Operation, Safety and Environment  

E-Print Network (OSTI)

Today's nuclear reactors are safe and highly efficient energy systems that offer electricity and a multitude of co-generation energy products ranging from potable water to heat for industrial applications. At the same time, catastrophic earthquake and tsunami events in Japan resulted in the nuclear accident that forced us to rethink our approach to nuclear safety, design requirements and facilitated growing interests in advanced nuclear energy systems, next generation nuclear reactors, which are inherently capable to withstand natural disasters and avoid catastrophic consequences without any environmental impact. This book is one in a series of books on nuclear power published by InTech. Under the single-volume cover, we put together such topics as operation, safety, environment and radiation effects. The book is not offering a comprehensive coverage of the material in each area. Instead, selected themes are highlighted by authors of individual chapters representing contemporary interests worldwide. With all diversity of topics in 16 chapters, the integrated system analysis approach of nuclear power operation, safety and environment is the common thread. The goal of the book is to bring nuclear power to our readers as one of the promising energy sources that has a unique potential to meet energy demands with minimized environmental impact, near-zero carbon footprint, and competitive economics via robust potential applications. The book targets everyone as its potential readership groups - students, researchers and practitioners - who are interested to learn about nuclear power.

Tsvetkov, Pavel

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Materials for Nuclear Power: Digital Resource Center ... - TMS  

Science Conference Proceedings (OSTI)

Materials for Nuclear Power, 0, 2175, Maureen Byko, 3/15/2009 8:21 PM ... A comprehensive introductory educational site about all forms of nuclear power, 0 ...

342

DOE Announces Loan Guarantee Applications for Nuclear Power Plant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee Applications for Nuclear Power Plant Construction DOE Announces Loan Guarantee Applications for Nuclear Power Plant Construction October 2, 2008 - 3:43pm Addthis...

343

Guidance for Deployment of Mobile Technologies for Nuclear Power...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers This...

344

DOE - Office of Legacy Management -- Hallam Nuclear Power Facility...  

Office of Legacy Management (LM)

Hallam Nuclear Power Facility - NE 01 FUSRAP Considered Sites Site: Hallam Nuclear Power Facility (NE.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site...

345

DOE - Office of Legacy Management -- Piqua Nuclear Power Facility...  

Office of Legacy Management (LM)

Piqua Nuclear Power Facility - OH 08 FUSRAP Considered Sites Site: Piqua Nuclear Power Facility (OH.08 ) Designated Name: Alternate Name: Location: Evaluation Year: Site...

346

Bettis and Knolls Atomic Power Laboratories | National Nuclear...  

National Nuclear Security Administration (NNSA)

Bettis and Knolls Atomic Power Laboratories | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

347

Materials for Nuclear Power: Digital Resource Center ... - TMS  

Science Conference Proceedings (OSTI)

Materials for Nuclear Power, 0, 2161, Maureen Byko, 3/15/2009 8:21 PM ... A comprehensive introductory educational site about all forms of nuclear power, 0 ...

348

Renewing America's Nuclear Power Partnership for Energy Security...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewing America's Nuclear Power Partnership for Energy Security and Economic Growth Renewing America's Nuclear Power Partnership for Energy Security and Economic Growth October 8,...

349

Japanese nuclear power and the Kyoto agreement  

E-Print Network (OSTI)

We find that, on an economic basis, nuclear power could make a substantial contribution for meeting the emissions target Japan agreed to in the Kyoto Protocol. It is unlikely however that the contribution would be as large ...

Babiker, Mustafa H.M.; Reilly, John M.; Ellerman, A. Denny.

350

Materials for Nuclear Power: Digital Resource Center - WEB ... - TMS  

Science Conference Proceedings (OSTI)

Feb 16, 2007 ... Topic Title: WEB RESOURCE: Virtual Nuclear Tourist! Nuclear Plants Around the ... Nuclear Power Plants Around the World.22 January 2006.

351

Materials for Nuclear Power: Digital Resource Center - WEB ... - TMS  

Science Conference Proceedings (OSTI)

Jun 25, 2007 ... The NRC regulates commercial nuclear power plants and other uses of nuclear materials, such as in nuclear medicine, through licensing, ...

352

BOOK: Environmental Degradation of Materials in Nuclear Power  

Science Conference Proceedings (OSTI)

Mar 28, 2007... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ... associated with spent fuel storage and radioactive waste disposal.

353

Nuclear power plant construction activity, 1986  

SciTech Connect

Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1987-07-24T23:59:59.000Z

354

Groundwater Protection Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The nuclear power industry has undertaken a Groundwater Protection Initiative at the Direction of the NEI Nuclear Strategic Issues Advisory Committee (NSIAC). This EPRI guideline provides essential technical guidance to utilities on the necessary elements of a sound groundwater protection program.

2007-11-27T23:59:59.000Z

355

Corrosion in the Nuclear Power Industry  

Science Conference Proceedings (OSTI)

...The U.S. nuclear industry generates approximately 20% of the electricity needs primarily from reactors designed and built over 30 years ago. Safety concerns continue to plague the industry. Severe cracks found at one nuclear power reactor (ca 2001) and the boric acid...

356

Modularization and nuclear power. Report by the Technology Transfer Modularization Task Team  

SciTech Connect

This report describes the results of the work performed by the Technology Transfer Task Team on Modularization. This work was performed as part of the Technology Transfer work being performed under Department of Energy Contract 54-7WM-335406, between December, 1984 and February, 1985. The purpose of this task team effort was to briefly survey the current use of modularization in the nuclear and non-nuclear industries and to assess and evaluate the techniques available for potential application to nuclear power. A key conclusion of the evaluation was that there was a need for a study to establish guidelines for the future development of Light Water Reactor, High Temperature Gas Reactor and Liquid Metal Reactor plants. The guidelines should identify how modularization can improve construction, maintenance, life extension and decommissioning.

1985-06-01T23:59:59.000Z

357

Connecticut Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2ct Millstone Unit 2, Unit 3 2,103 16,750 100.0 Dominion Nuclear Conn Inc 1 Plant 2 Reactors Owner Note: Totals may not equal sum of components due to independent ...

358

Trends in Nuclear Power - TMS  

Science Conference Proceedings (OSTI)

An overview of FY 2007 programs for the Nuclear Energy Research Initiative, U. S. Department of Energy, 0, 805, Todd Osman, 6/13/2007 2:08 PM by Todd ...

359

Arkansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2ar Arkansas Nuclear One Unit 1, Unit 2 1,835 15,023 100.0 Entergy Arkansas Inc 1 Plant 2 Reactors Owner Note: Totals may not equal sum of ...

360

Idaho Site Closes Out Decontamination and Decommissioning Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FALLS, Idaho - The Idaho Cleanup Project (ICP) successfully closed out a 796 million nuclear facility decontamination and decommissioning project. The work was completed about...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NMSS handbook for decommissioning fuel cycle and materials licensees  

Science Conference Proceedings (OSTI)

The US Nuclear Regulatory Commission amended its regulations to set forth the technical and financial criteria for decommissioning licensed nuclear facilities. These regulations were further amended to establish additional recordkeeping requirements for decommissioning; to establish timeframes and schedules for the decommissioning; and to clarify that financial assurance requirements must be in place during operations and updated when licensed operations cease. Reviews of the Site Decommissioning Management Plan (SDMP) program found that, while the NRC staff was overseeing the decommissioning program at nuclear facilities in a manner that was protective of public health and safety, progress in decommissioning many sites was slow. As a result NRC determined that formal written procedures should be developed to facilitate the timely decommissioning of licensed nuclear facilities. This handbook was developed to aid NRC staff in achieving this goal. It is intended to be used as a reference document to, and in conjunction with, NRC Inspection Manual Chapter (IMC) 2605, ``Decommissioning Inspection Program for Fuel Cycle and Materials Licensees.`` The policies and procedures discussed in this handbook should be used by NRC staff overseeing the decommissioning program at licensed fuel cycle and materials sites; formerly licensed sites for which the licenses were terminated; sites involving source, special nuclear, or byproduct material subject to NRC regulation for which a license was never issued; and sites in the NRC`s SDMP program. NRC staff overseeing the decommissioning program at nuclear reactor facilities subject to regulation under 10 CFR Part 50 are not required to use the procedures discussed in this handbook.

Orlando, D.A.; Hogg, R.C.; Ramsey, K.M. [and others

1997-03-01T23:59:59.000Z

362

Nuclear Power - System Simulations and Operation  

E-Print Network (OSTI)

At the onset of the 21st century, we are searching for reliable and sustainable energy sources that have a potential to support growing economies developing at accelerated growth rates, technology advances improving quality of life and becoming available to larger and larger populations. The quest for robust sustainable energy supplies meeting the above constraints leads us to the nuclear power technology. Today's nuclear reactors are safe and highly efficient energy systems that offer electricity and a multitude of co-generation energy products ranging from potable water to heat for industrial applications. Catastrophic earthquake and tsunami events in Japan resulted in the nuclear accident that forced us to rethink our approach to nuclear safety, requirements and facilitated growing interests in designs, which can withstand natural disasters and avoid catastrophic consequences. This book is one in a series of books on nuclear power published by InTech. It consists of ten chapters on system simulations and operational aspects. Our book does not aim at a complete coverage or a broad range. Instead, the included chapters shine light at existing challenges, solutions and approaches. Authors hope to share ideas and findings so that new ideas and directions can potentially be developed focusing on operational characteristics of nuclear power plants. The consistent thread throughout all chapters is the system-thinking approach synthesizing provided information and ideas. The book targets everyone with interests in system simulations and nuclear power operational aspects as its potential readership groups - students, researchers and practitioners.

Tsvetkov, Pavel

2011-09-01T23:59:59.000Z

363

Studies of Fourteen Nuclear-Powered Airplanes  

SciTech Connect

A representative series of aircraft which could be powered by a relatively low-temperature liquid-coolant-cycle nuclear power plant are described. Present aircraft such as the B-36, B-52, and B-47 bombers as well as new designs were investigated. Design and performance characteristics of all the aircraft are presented.

Hutton, J. N.; McCulloch, J. C.; Schmill, W. C.; Ward, W. H.

1952-09-01T23:59:59.000Z

364

Decommissioning Handbook | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decommissioning Handbook Decommissioning Handbook The Decommissioning Handbook has been developed to incorporate examples and lessons learned, and to illustrate practices and...

365

Nuclear power in the Soviet Bloc  

SciTech Connect

The growth of Soviet Bloc nuclear power generation to the end of the century is evaluated on the basis of policy statements of objectives, past and current nuclear power plant construction, and trends in the potential for future construction. Central to this study is a detailed examination of individual reactor construction and site development that provides specific performance data not given elsewhere. A major commitment to nuclear power is abundantly clear and an expansion of ten times in nuclear electric generation is estimated between 1980 and 2000. This rate of growth is likely to have significant impact upon the total energy economy of the Soviet Bloc including lessening demands for use of coal, oil, and gas for electricity generation.

Davey, W.G.

1982-03-01T23:59:59.000Z

366

Major Programs - Nuclear Engineering Division (Argonne)  

NLE Websites -- All DOE Office Websites (Extended Search)

Assistance Program International Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form...

367

Executive Bios: Christopher Grandy - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

368

Nuclear Engineering Division of Argonne National Laboratory:...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

369

Fuel Cycle Technologies Program - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

370

International Safety Projects - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

371

The Dawn of the Nuclear Age  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

372

Facility Safety Assessment - Nuclear Engineering Division (Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

373

Computer Facilities - Nuclear Engineering Division (Argonne)  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

374

Advanced Computation & Visualization - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

375

Steam Generator Tube Integrity Facilities - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

376

Safety - Vulnerability Assessment Team - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

377

Texas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2tx Comanche Peak Unit 1, Unit 2 2,406 20,208 48.9 Luminant Generation Company LLC South Texas Project Unit 1, Unit 2 2,560 21,127 51.1 STP Nuclear Operating Co

378

Climate Change, Nuclear Power and Nuclear Proliferation: Magnitude Matters  

Science Conference Proceedings (OSTI)

Integrated energy, environment and economics modeling suggests electrical energy use will increase from 2.4 TWe today to 12 TWe in 2100. It will be challenging to provide 40% of this electrical power from combustion with carbon sequestration, as it will be challenging to provide 30% from renewable energy sources. Thus nuclear power may be needed to provide ~30% by 2100. Calculations of the associated stocks and flows of uranium, plutonium and minor actinides indicate that the proliferation risks at mid-century, using current light-water reactor technology, are daunting. There are institutional arrangements that may be able to provide an acceptable level of risk mitigation, but they will be difficult to implement. If a transition is begun to fast-spectrum reactors at mid-century, without a dramatic change in the proliferation risks of such systems, at the end of the century proliferation risks are much greater, and more resistant to mitigation. The risks of nuclear power should be compared with the risks of the estimated 0.64oC long-term global surface-average temperature rise predicted if nuclear power were replaced with coal-fired power plants without carbon sequestration. Fusion energy, if developed, would provide a source of nuclear power with much lower proliferation risks than fission.

Robert J. Goldston

2010-03-03T23:59:59.000Z

379

The Fukushima Nuclear Event and its Implications for Nuclear Power  

SciTech Connect

The combined strong earthquake and super tsunami of 12 March 2011 at the Fukushima nuclear power plant imposed the most severe challenges ever experienced at such a facility. Information regarding the plant response and status remains uncertain, but it is clear that severe damage has been sustained, that the plant staff have responded creatively and that the offsite implications are unlikely to be seriously threatening to the health, if not the prosperity, of the surrounding population. Re-examination of the regulatory constraints of nuclear power will occur worldwide, and some changes are likely, particularly concerning reliance upon active systems for achieving critical safety functions and concerning treatments of used reactor fuel. Whether worldwide expansion of the nuclear power economy will be slowed in the long run is perhaps unlikely and worth discussion.

Golay, Michael (MIT)

2011-07-06T23:59:59.000Z

380

PowerPoint Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Services Solid Waste Management Operations Nuclear Materials Decontamination & Decommissioning Environmental Management Operations Lessons Learned Construction...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Review: Nuclear Power Is Not the Answer by Helen Caldicott  

E-Print Network (OSTI)

Sciences, Pakistan. Helen Caldicott. Nuclear Power Is NotNuclear Information and Resource Service (http://www.nirs.org) Umar Karim Mirza , PakistanNuclear Power Is Not the Answer By Helen Caldicott Reviewed by Umar Karim Mirza Pakistan

Mirza, Umar Karim

2007-01-01T23:59:59.000Z

382

Michigan Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2mi Donald C Cook Unit 1, Unit 2 2,069 15,646 52.8 Indiana Michigan Power Co Fermi Unit 2 1,085 7,738 26.1 Detroit Edison Co Palisades Unit 1 793 ...

383

NUCLEAR DATA AND MEASUREMENTS REPORTS 61-80 - Nuclear Data Program...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

384

NUCLEAR DATA AND MEASUREMENTS REPORTS 81-100 - Nuclear Data Program...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

385

Nuclear Power - Control, Reliability and Human Factors  

E-Print Network (OSTI)

Advances in reactor designs, materials and human-machine interfaces guarantee safety and reliability of emerging reactor technologies, eliminating possibilities for high-consequence human errors as those which have occurred in the past. New instrumentation and control technologies based in digital systems, novel sensors and measurement approaches facilitate safety, reliability and economic competitiveness of nuclear power options. Autonomous operation scenarios are becoming increasingly popular to consider for small modular systems. This book belongs to a series of books on nuclear power published by InTech. It consists of four major sections and contains twenty-one chapters on topics from key subject areas pertinent to instrumentation and control, operation reliability, system aging and human-machine interfaces. The book targets a broad potential readership group - students, researchers and specialists in the field - who are interested in learning about nuclear power.

Tsvetkov, Pavel

2011-09-01T23:59:59.000Z

386

Seismic Isolation of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

With increasing public concern for seismic safety in general and research findings that indicate that seismic hazards may be larger than expected in many parts of the world, it would be prudent for the nuclear industry to consider more fully the potential benefits, costs, and impediments associated with applying seismic isolation more widely and to identify actions needed to develop practical and cost-effective guidelines for the application of seismic isolation to nuclear power plants (NPPs) and ...

2013-10-28T23:59:59.000Z

387

Multiple microprocessor based nuclear reactor power monitor  

SciTech Connect

The reactor power monitor is a portable multiple-microprocessor controlled data acquisition device being built for the International Atomic Energy Association. Its function is to measure and record the hourly integrated operating thermal power level of a nuclear reactor for the purpose of detecting unannounced plutonium production. The monitor consists of a /sup 3/He proportional neutron detector, a write-only cassette tape drive and control electronics based on two INTEL 8748 microprocessors. The reactor power monitor operates from house power supplied by the plant operator, but has eight hours of battery backup to cover power interruptions. Both the hourly power levels and any line power interruptions are recorded on tape and in memory. Intermediate dumps from the memory to a data terminal or strip chart recorder can be performed without interrupting data collection.

Lewis, P.S.; Ethridge, C.D.

1979-01-01T23:59:59.000Z

388

A NOVEL APPROACH TO SPENT FUEL POOL DECOMMISSIONING  

Science Conference Proceedings (OSTI)

The Idaho National Laboratory (INL) has been at the forefront of developing methods to reduce the cost and schedule of deactivating spent fuel pools (SFP). Several pools have been deactivated at the INL using an underwater approach with divers. These projects provided a basis for the INL cooperation with the Dresden Nuclear Power Station Unit 1 SFP (Exelon Generation Company) deactivation. It represents the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating process. This approach has advantages in many aspects, particularly in reducing airborne contamination and allowing safer, more cost effective deactivation. The INL pioneered underwater coating process was used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by INL and Exelon to decommission SFPs using the underwater coating process. The rationale used to select the underwater coating process and the advantages and disadvantages are described. Special circumstances are also discussed, such as the use of a remotely-operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible. A larger project, the INTEC-603 SFP in-situ (grouting) deactivation, is reviewed. Several specific areas where special equipment was employed are discussed and a Lessons Learned evaluation is included.

R. L. Demmer

2011-04-01T23:59:59.000Z

389

A Novel Approach to Spent Fuel Pool Decommissioning  

SciTech Connect

The Dresden Nuclear Power Station Unit 1 Spent Fuel Pool (SFP) (Exelon Generation Co.) was decommissioned using a new underwater coating strategy developed in cooperation with the Idaho National Laboratory (INL). This was the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating approach. This approach has advantages in many aspects, particularly in reducing airborne contamination and in safer, more cost effective deactivation. The process was pioneered at the INL and used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. The INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by the INL and Exelon on the pathway for this activity. The rationale used to select the underwater coating option and the advantages and disadvantages are shown. Special circumstances, such as the use of a remotely operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible, are discussed. Several specific areas where special equipment was employed are given and a lessons learned evaluation is included.

R.L. Demmer; J.B. Panozzo; R.J. Christensen

2008-09-01T23:59:59.000Z

390

Decommissioning the Dresden Unit 1 Spent Fuel Pool  

Science Conference Proceedings (OSTI)

The Dresden Nuclear Power Station, Unit 1 Spent Fuel Pool (SFP) (Exelon Generation Co.) was decommissioned using a new underwater coating strategy developed in cooperation with the Idaho National Laboratory (INL). This was the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating approach. This approach has advantages in many aspects, particularly in reducing airborne contamination and in safer, more cost effective deactivation. The process was pioneered at the INL and used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. The INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by the INL and Exelon on the pathway for this activity. The rationale used to select the underwater coating option and the advantages and disadvantages are shown. Special circumstances, such as the use of a remotely operated underwater vehicle to map (visually and radiologically) the pool areas that were not readily accessible, are discussed. Several specific areas where special equipment was employed are given and a lessons learned evaluation is included. (authors)

Demmer, R.L.; Bargelt, R.J. [Idaho National Laboratory, P. O. Box 1625, Idaho Falls, ID 83415-7113 (United States); Panozzo, J.B.; Christensen, R.J. [Exelon Generation Company, LLC, Dresden Nuclear Power Station, Warrenville, IL 60555 (United States)

2006-07-01T23:59:59.000Z

391

Virtual environments for nuclear power plant design  

SciTech Connect

In the design and operation of nuclear power plants, the visualization process inherent in virtual environments (VE) allows for abstract design concepts to be made concrete and simulated without using a physical mock-up. This helps reduce the time and effort required to design and understand the system, thus providing the design team with a less complicated arrangement. Also, the outcome of human interactions with the components and system can be minimized through various testing of scenarios in real-time without the threat of injury to the user or damage to the equipment. If implemented, this will lead to a minimal total design and construction effort for nuclear power plants (NPP).

Brown-VanHoozer, S.A.; Singleterry, R.C. Jr.; King, R.W. [and others

1996-03-01T23:59:59.000Z

392

Nuclear power plant construction activity 1987  

SciTech Connect

This annual report published by the Energy Information Administration (EIA) presents data on nuclear power plant construction activity. The previous report, Nuclear Power Plant Construction Activity 1986, included data for units that, as of December 31, 1986, were (1) in the construction pipeline, (2) canceled, or (3) commercial operation as of December 31, 1986. The data in this report, which were collected on Form EIA-254, ''Semiannual Report on Status of Reactor Construction,'' update the data in the previous report to be current as of December 31, 1987. Three types of information are included: plant characteristics and ownership; construction costs; and construction schedules and milestone dates.

1988-06-09T23:59:59.000Z

393

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

394

Vibratory Shear Enhanced Process Filtration for Processing Decommissioning Wastes at Rancho Seco  

Science Conference Proceedings (OSTI)

Many non-nuclear industries use a vibratory shear enhanced filtration process (VSEP) to separate solids in liquid streams. Unlike other methods, including the application of a precoat of filter media, the VSEP does not generate any secondary waste, making it seem ideally suited for nuclear power plant radwaste systems. This report presents the results of laboratory and pilot scale in-plant testing of VSEP's ability to successfully process radioactive decommissioning waste. Testing at Rancho Seco showed t...

2003-12-02T23:59:59.000Z

395

Maryland Nuclear Profile - Calvert Cliffs Nuclear Power Plant  

U.S. Energy Information Administration (EIA)

snpt3md6011 855 6,755 90.2 PWR 850 7,239 97.2 1,705 13,994 93.7 Calvert Cliffs Nuclear Power Plant Unit Type Data for 2010 PWR = Pressurized Light Water Reactor.

396

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

397

Shutdown plus 3 - a look at Yankee decommissioning experience  

Science Conference Proceedings (OSTI)

In three years, the Yankee Nuclear Power Station has not only made the transition from a facility with a full power operating license to a shut down facility but to a facility with a mature and experienced organization poised to effectively and efficiently decommission the remainder of the plant. Opportunities were acted upon to reduce the cost of running and dismantling a shut-down facility. This paper describes some of those opportunities and Yankee`s future strategy for dismantling in an environment with limited waste disposal availability.

Szymczak, W.J. [Yankee Atomic Electric Co., Bolton, MA (United States)

1995-12-31T23:59:59.000Z

398

MODERATOR ELEMENTS FOR UNIFORM POWER NUCLEAR REACTOR  

DOE Patents (OSTI)

This patent describes a method of obtaining a flatter flux and more uniform power generation across the core of a nuclear reactor. The method comprises using moderator elements having differing moderating strength. The elements have an increasing amount of the better moderating material as a function of radial and/or axial distance from the reactor core center. (AEC)

Balent, R.

1963-03-12T23:59:59.000Z

399

Groundwater Monitoring Guidance for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Recent experience has shown that the initial design of nuclear power plant groundwater characterization programs can have a significant impact upon the resources needed to demonstrate regulatory compliance. This document provides technical experience and lessons learned in designing an optimized groundwater investigation program.

2005-09-06T23:59:59.000Z

400

Nuclear Power Technology for the Future  

DOE Green Energy (OSTI)

Ensuring sufficient energy for electricity, fresh water and transportation represents a major challenge for this century. Energy demand will increase dramatically as developing countries improve their standards of living. Nuclear power will become an increasingly important source of energy for production of electricity, fresh water and hydrogen as transportation fuel. Hydrocarbon sources of energy are not acceptable in the long term because of global warming and uneven supply. To ensure that nuclear power can meet this challenge, improved technologies are required to address the problems of nuclear waste, management of nuclear materials and safety as many more nuclear plants are built. These technologies are being developed at Argonne National Laboratory as part of the DOE international program of Generation IV reactors. Essential to meeting these challenges is the development of fast-spectrum nuclear reactors for which fuel and fission products are recycled to the reactor to be 'burned'. I will discuss work on fast-spectrum reactor and fuel-cycle design. The technologies discussed will be 'passively safe' reactor design and 'pyroprocessing' for fuel reprocessing.

Sackett, John I. (ANL)

2003-07-23T23:59:59.000Z

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

South Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

South Carolina nuclear power plants, summer capacity and net generation, 2010" South Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Catawba Unit 1, Unit 2","2,258","18,964",36.5,"Duke Energy Carolinas, LLC" "H B Robinson Unit 2",724,"3,594",6.9,"Progress Energy Carolinas Inc" "Oconee Unit 1, Unit 2, Unit 3","2,538","20,943",40.3,"Duke Energy Carolinas, LLC" "V C Summer Unit 1",966,"8,487",16.3,"South Carolina Electric&Gas Co" "4 Plants 7 Reactors","6,486","51,988",100.0

402

Nuclear Power: A Price Worth Paying For A Stable Climate? Will Cavendish & Robert Gross  

E-Print Network (OSTI)

and decommissioning of nuclear facilities. For a major chemical company, the CNWRA used trans- port analysis and dose techni- cal assistance and research to the U.S. Nuclear Regulatory Commission (NRC). Its initial focus was on work needed to license a potential geologic repository for spent nuclear fuel and high

403

Executive Director for Operations PROPOSED RULE ON DECOMMISSIONING TRUST PROVISIONS  

E-Print Network (OSTI)

To request Commission approval to publish a proposed rule in the Federal Register on decommissioning trust agreement requirements. BACKGROUND: The staff presented a rulemaking plan (SECY-00-0002) to the Commission on December 30, 1999. The plan discussed two actions relating to amending nuclear power reactor decommissioning trust provisions i.e., to amend 10 CFR 50.75 and revise Regulatory Guide 1.159. Subsequently, in a February 9, 2000, staff requirements memorandum (SRM) to the Executive Director for Operations (Attachment 1), the Commission authorized the staff to proceed with the rulemaking plan. Further, the Commission instructed the staff that “any specific trust fund terms and conditions necessary to protect the funds fully should be set out in the rule itself, not in the regulatory guide. Sample language for trust agreements consistent with the terms and conditions within the rule may be provided within the associated regulatory guide.” The attached Federal Register notice (FRN) responds to the SRM. DISCUSSION: Contact:

William D. Travers; Brian Richter

2001-01-01T23:59:59.000Z

404

Global nuclear power supply chains and the rise of China's nuclear industry  

E-Print Network (OSTI)

China has embarked on a massive expansion of nuclear power that may fundamentally change the global nuclear industry, for better or for worse. Some industry observers argue that the incumbent nuclear power companies are ...

Metzler, Florian

2012-01-01T23:59:59.000Z

405

Materials for Nuclear Power: Digital Resource Center - WEB ...  

Science Conference Proceedings (OSTI)

Feb 16, 2007 ... Topic Title: WEB RESOURCE: Nuclear Energy Institute Topic Summary: Timely coverage of developments in the the nuclear power industry

406

Overview of Trends in Nuclear Power Plant Sensors and Instrumentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Trends in Nuclear Power Plant Sensors and Instrumentation SASAN BAKTIARI Nuclear Engineering Division Argonne National Laboratory Ph: (630) 252-8982 bakhtiati@anl.gov Abstract -...

407

Deputy Secretary Poneman Delivers Remarks on Nuclear Power at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ranging from preventing the proliferation of nuclear weapons and confronting North Korea, to power generation and operational safety at civil nuclear plants, to deep...

408

How much electricity does a typical nuclear power plant generate ...  

U.S. Energy Information Administration (EIA)

... (kWh). There were 65 nuclear power plants with 104 operating nuclear reactors that generated a total of 790 billion kilowatt-hours (kWh), ...

409

Evidence from U.S. Nuclear Power  

E-Print Network (OSTI)

For the first four decades of its existence the U.S. nuclear power industry was run by regulated utilities, with most companies owning only one or two reactors. Beginning in the late 1990s electricity markets in many states were deregulated and almost half of the nation’s 103 reactors were sold to independent power producers selling power in competitive wholesale markets. Deregulation has been accompanied by substantial market consolidation and today the three largest companies control more than one?third of all U.S. nuclear capacity. We find that deregulation and consolidation are associated with a 10 percent increase in operating efficiency, achieved primarily by reducing the frequency and duration of reactor outages. At average wholesale prices the value of this increased efficiency is approximately $2.5 billion annually and implies an annual decrease of almost 40 million metric tons of

Lucas W. Davis; Catherine Wolfram; Lucas W. Davis; Catherine Wolfram

2011-01-01T23:59:59.000Z

410

Space Nuclear Power: Opening the Final Frontier  

E-Print Network (OSTI)

Nuclear power sources have enabled or enhanced some of the most challenging and exciting space missions yet conducted, including missions such as the Pioneer flights to Jupiter, Saturn, and beyond; the Voyager flights to Jupiter, Saturn, Uranus, Neptune, and beyond; the Apollo lunar surface experiments; the Viking Lander studies of Mars; the Ulysses mission to study the polar regions of the Sun; the Galileo mission that orbited Jupiter; the Cassini mission orbiting Saturn and the recently launched New Horizons mission to Pluto. In addition, radioisotope heater units have enhanced or enabled the Mars exploration rover missions (Sojourner, Spirit and Opportunity). Since 1961, the United States has successfully flown 41 radioisotope thermoelectric generators (RTGs) and one reactor to provide power for 24 space systems. The former Soviet Union has reportedly flown at least 35 nuclear reactors and at least two RTGs to power 37 space systems. 1.

Gary L. Bennett

2006-01-01T23:59:59.000Z

411

Transactions of the fourth symposium on space nuclear power systems  

DOE Green Energy (OSTI)

This paper contains the presented papers at the fourth symposium on space nuclear power systems. Topics of these papers include: space nuclear missions and applications, reactors and shielding, nuclear electric and nuclear propulsion, refractory alloys and high-temperature materials, instrumentation and control, energy conversion and storage, space nuclear fuels, thermal management, nuclear safety, simulation and modeling, and multimegawatt system concepts. (LSP)

El-Genk, M.S.; Hoover, M.D. (eds.)

1987-01-01T23:59:59.000Z

412

Transactions of the fifth symposium on space nuclear power systems  

Science Conference Proceedings (OSTI)

This paper contains the presented papers at the fourth symposium on space nuclear power systems. Topics of these paper include: space nuclear missions and applications, reactors and shielding, nuclear electric and nuclear propulsion, high-temperature materials, instrumentation and control, energy conversion and storage, space nuclear fuels, thermal management, nuclear safety, simulation and modeling, and multimegawatt system concepts. (LSP)

El-Genk, M.S.; Hoover, M.D. (eds.)

1988-01-01T23:59:59.000Z

413

Executive Bios: Dr. Robert N. Hill - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

414

Related Sites, Experimental Resources for Nuclear Data Studies...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

415

Executive Bios: Dr. David C. Wade - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

416

ANS President interviewed at the Argonne Booth during the Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

417

Executive Bios: Jerome L. Gaston - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

418

Executive Bios: A. C. (Paul) Raptis - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

419

Executive Bios: Dr. Hussein S. Khalil - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

420

Argonne's role in DOE/NNSA International Nuclear Safeguards and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Argonne staff members elected to American Nuclear Society governance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

422

Reactor Safety Testing and Analysis - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

423

Executive Bios: Dr. Temitope Taiwo - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

424

Sloshing response of module-type worm tank - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

425

Executive Bios: Dr. Thomas F. Ewing - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

426

Waste Form Performance Modeling [Nuclear Waste Management using...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

427

Executive Bios: Dr. John G. Stevens - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

428

Vulnerability Assessment Team (VAT) in the News - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

429

Executive Bios: Dr. Pete Heine - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

430

Executive Bios: Dr. Tanju Sofu - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

431

Risk and Safety Assessments - Nuclear Engineering Division (Argonne...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

432

Executive Bios: Dr. Ken Natesan - Nuclear Engineering Division...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

433

Unit Process Modeling [Nuclear Waste Management using Electrometallurg...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

434

Management of National Nuclear Power Programs for assured safety  

SciTech Connect

Topics discussed in this report include: nuclear utility organization; before the Florida Public Service Commission in re: St. Lucie Unit No. 2 cost recovery; nuclear reliability improvement and safety operations; nuclear utility management; training of nuclear facility personnel; US experience in key areas of nuclear safety; the US Nuclear Regulatory Commission - function and process; regulatory considerations of the risk of nuclear power plants; overview of the processes of reliability and risk management; management significance of risk analysis; international and domestic institutional issues for peaceful nuclear uses; the role of the Institute of Nuclear Power Operations (INPO); and nuclear safety activities of the International Atomic Energy Agency (IAEA).

Connolly, T.J. (ed.)

1985-01-01T23:59:59.000Z

435

Coal and nuclear power: Illinois' energy future  

SciTech Connect

This conference was sponsored by the Energy Resources Center, University of Illinois at Chicago; the US Department of Energy; the Illinois Energy Resources Commission; and the Illinois Department of Energy and Natural Resources. The theme for the conference, Coal and Nuclear Power: Illinois' Energy Future, was based on two major observations: (1) Illinois has the largest reserves of bituminous coal of any state and is surpassed in total reserves only by North Dakota, and Montana; and (2) Illinois has made a heavy commitment to the use of nuclear power as a source of electrical power generation. Currently, nuclear power represents 30% of the electrical energy produced in the State. The primary objective of the 1982 conference was to review these two energy sources in view of the current energy policy of the Reagan Administration, and to examine the impact these policies have on the Midwest energy scene. The conference dealt with issues unique to Illinois as well as those facing the entire nation. A separate abstract was prepared for each of the 30 individual presentations.

Not Available

1982-01-01T23:59:59.000Z

436

Author's personal copy Cost analysis of the US spent nuclear fuel reprocessing facility  

E-Print Network (OSTI)

Types of Nuclear Facilities, from 2001 to 2050 62 Figure 13. Decommissioning Schedule of Power PlantsThe Potential for a Nuclear Renaissance: The Development of Nuclear Power Under Climate Change to the Engineering Systems Division and the Department of Nuclear Science and Engineering in Partial Fulfillment

Deinert, Mark

437

Climate Change, Nuclear Power and Nuclear Proliferation: Magnitude Matters  

Science Conference Proceedings (OSTI)

Integrated energy, environment and economics modeling suggests that worldwide electrical energy use will increase from 2.4 TWe today to ~12 TWe in 2100. It will be challenging to provide 40% of this electrical power from combustion with carbon sequestration, as it will be challenging to provide 30% from renewable energy sources derived from natural energy flows. Thus nuclear power may be needed to provide ~30%, 3600 GWe, by 2100. Calculations of the associated stocks and flows of uranium, plutonium and minor actinides indicate that the proliferation risks at mid-century, using current light-water reactor technology, are daunting. There are institutional arrangements that may be able to provide an acceptable level of risk mitigation, but they will be difficult to implement. If a transition is begun to fast-spectrum reactors at mid-century, without a dramatic change in the proliferation risks of such systems, at the end of the century global nuclear proliferation risks are much greater, and more resistant to mitigation. Fusion energy, if successfully demonstrated to be economically competitive, would provide a source of nuclear power with much lower proliferation risks than fission.

Robert J. Goldston

2011-04-28T23:59:59.000Z

438

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective  

SciTech Connect

Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to a longer than anticipated period to obtain NRC approval of the Maine Yankee License Termination Plan (LTP). By employing the lessons learned from its first LTP submittal, which was not accepted by the NRC staff, Trojan was able to obtain approval of its revised LTP promptly. While both licensees provided final status survey reports (FSSRs) for NRC approval, the Trojan approach to decommissioning and data management allowed NRC to efficiently review FSS records and supporting documentation. Therefore, NRC was able to review Trojan's FSSR more efficiently than Maine Yankee's FSSR. This paper describes the regulatory impacts of the two different approaches to the decommissioning, the development of licensee required plans, decommissioning operations and records, the differences in licensing processes, and the lessons learned for improving the processes. (authors)

Watson, B.A.; Buckley, J.T.; Craig, C.M. [U.S. Nuclear Regulatory Commission, Office of Nuclear Materials Safety and Safeguards, Decommissioning Directorate (T7E18), Washington, D.C. 20555 (United States)

2006-07-01T23:59:59.000Z

439

Japan depends significantly on nuclear power to meet its ...  

U.S. Energy Information Administration (EIA)

Sales, revenue and prices, power plants, fuel use, stocks, generation, ... the contribution of nuclear power to electricity production is more stable at 19% to 20%.

440

Materials for Nuclear Power: Digital Resource Center - WEB ...  

Science Conference Proceedings (OSTI)

Feb 12, 2007 ... The "Inside a Nuclear Power Plant" section of this web page gives a brief and very basic introduction to the major systems in a nuclear power ...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

SIGNAL GROUPING FOR CONDITION MONITORING OF NUCLEAR POWER PLANT COMPONENTS  

E-Print Network (OSTI)

SIGNAL GROUPING FOR CONDITION MONITORING OF NUCLEAR POWER PLANT COMPONENTS Piero Baraldi between those used to monitor the reactor coolant pump of a Pressurized Water Reactor (PWR) is considered Monitoring, Empirical Modeling, Power Plants, Safety Critical Nuclear Instrumentation, Autoassociative models

442

"Ensuring Nuclear Power is Both Peaceful and Plentiful" | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

"Ensuring Nuclear Power is Both Peaceful and Plentiful" "Ensuring Nuclear Power is Both Peaceful and Plentiful" September 21, 2010 - 6:33pm Addthis Secretary Chu speaks at the...

443

Recent Progress in U.S. Nuclear Power Plant Safety  

NLE Websites -- All DOE Office Websites (Extended Search)

Recent Progress in U.S. Nuclear Power Plant Safety Speaker(s): Robert Budnitz Date: April 15, 2010 - 12:00pm Location: 90-3122 The U.S. commercial nuclear-power industry consists...

444

Nuclear power and prima facie duties towards future people  

Science Conference Proceedings (OSTI)

Before assessing the desirability of nuclear power we first need to narrow down the focus on its potential and its impediments. Within the technological possibilities of nuclear power production, I shall formulate two prima facie duties for safeguarding ...

Behnam Taebi

2009-05-01T23:59:59.000Z

445

NIST Processes to Help Build Next-Generation Nuclear Power ...  

Science Conference Proceedings (OSTI)

NIST Processes to Help Build Next-Generation Nuclear Power Plants. From NIST Tech Beat: June 2, 2009. ...

2011-04-04T23:59:59.000Z

446

Nuclear Power Plant NDE Challenges — Past, Present, and Future  

Science Conference Proceedings (OSTI)

The operating fleet of U.S. nuclear power plants was built to fossil plant standards (of workmanship

S. R. Doctor

2007-01-01T23:59:59.000Z

447

Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE))

NNSA presentation on Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant from May 13, 2011

448

Environmental Degradation of Materials in Nuclear Power Systems ...  

Science Conference Proceedings (OSTI)

Recapping the Environmental Degradation of Materials in Nuclear Power ... The conference hosted utility engineers, reactor vendor engineers, plant architect ...

449

Engineering Fundamentals - Nuclear Power Plant Materials, Version 2.0  

Science Conference Proceedings (OSTI)

The Engineering Fundamentals - Nuclear Power Plant Materials (EF-Materials) Version 2.0 computer-based training module provides new-hire engineering personnel with an overview of the basic concepts of nuclear power plant materials. Graphics and interactive features are used to enhance learning.EF-Materials covers the basic terms and concepts related to nuclear power plant materials and provides information about the significance of material degradation issues in nuclear power plants. ...

2012-11-30T23:59:59.000Z

450

Environmental Degradation of Materials in Nuclear Power Systems ...  

Science Conference Proceedings (OSTI)

Environmental Degradation of Materials in Nuclear Power Systems—Water ... problems associated with spent fuel storage and radioactive waste disposal.

451

Materials for Nuclear Power: Digital Resource Center - 15th Int'l ...  

Science Conference Proceedings (OSTI)

Apr 14, 2011... Trends in Nuclear Power, The Nuclear Fuel Cycle, Nuclear Science ... 15th Int'l Conference on Environmental Degradation in Nuclear Power ...

452

Decommissioning Low Level Waste Management and Reduction Guide  

Science Conference Proceedings (OSTI)

Nuclear plants undertaking decommissioning projects find that costs of low-level waste (LLW) management are a substantial portion of the total cost. To assist the industry in planning and optimizing their decommissioning radwaste management practices, EPRI developed a guide with more than 75 areas of guidance and an extensive lessons learned section. Using this report will aid utilities in successfully planning, executing, and disposing of low-level wastes during a decommissioning project.

1999-09-17T23:59:59.000Z

453

Electromagnetic Compatibility in Nuclear Power Plants  

SciTech Connect

Electromagnetic compatibility (EMC) has long been a key element of qualification for mission critical instrumentation and control (I&C) systems used by the U.S. military. The potential for disruption of safety-related I&C systems by electromagnetic interference (EMI), radio-frequency interference (RFI), or power surges is also an issue of concern for the nuclear industry. Experimental investigations of the potential vulnerability of advanced safety systems to EMI/RFI, coupled with studies of reported events at nuclear power plants (NPPs) that are attributed to EMI/RFI, confirm the safety significance of EMC for both analog and digital technology. As a result, Oak Ridge National Laboratory has been engaged in the development of the technical basis for guidance that addresses EMC for safety-related I&C systems in NPPs. This research has involved the identification of engineering practices to minimize the potential impact of EMI/RFI and power surges and an evaluation of the ambient electromagnetic environment at NPPs to tailor those practices for use by the nuclear industry. Recommendations for EMC guidance have been derived from these research findings and are summarized in this paper.

Ewing, P.D.; Kercel, S.W.; Korsah, K.; Wood, R.T.

1999-08-29T23:59:59.000Z

454

Research of IPE Solution Applied to EPR Nuclear Power Project  

Science Conference Proceedings (OSTI)

A nuclear power company is currently in the process of constructing the advanced 3rd generation of EPR Nuclear Power Plant, and its corresponding information system is an overall integrated information management system based on the new concept design. ... Keywords: digital nuclear power plant, IPE solutions, comprehensive application

Daqiao Wang; Fangneng Hu; Yi Luo; Yi Ma

2012-07-01T23:59:59.000Z

455

A knowledge representation model for the nuclear power generation domain  

Science Conference Proceedings (OSTI)

A knowledge representation model for the nuclear power field is proposed. The model is a generalized production rule function inspired by a neural network approach that enables the representation of physical systems of nuclear power plants. The article ... Keywords: Knowledge representation, Nuclear power plant, Physical systems, Production rules

Thiago Tinoco Pires

2007-11-01T23:59:59.000Z

456

Nuclear power generation and fuel cycle report 1997  

SciTech Connect

Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to the uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.

1997-09-01T23:59:59.000Z

457

Executive Summary: Research in Nuclear Power—Workshop on the Needs of the Next Generation of Nuclear Power Technology  

Science Conference Proceedings (OSTI)

Technical Paper / NSF Workshop on the Research Needs of the Next Generation Nuclear Power Technology / Fission Reactor

A. David Rossin; Kunmo Chung; K. L. Peddicord

458

Nuclear Power Generating Facilities (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) Nuclear Power Generating Facilities (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Radiation Control Program The first subchapter of the statute concerning Nuclear Power Generating Facilities provides for direct citizen participation in the decision to construct any nuclear power generating facility in Maine. The Legislature

459

Engineering Development & Applications - Nuclear Engineering...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies (FCT) Generation IV (Gen IV) Nuclear Energy Program Decontamination and Decommissioning Nuclear Regulatory Research Facilities Environmentally Assisted Cracking...

460

Secretary Chu Visits Vogtle Nuclear Power Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vogtle Nuclear Power Plant Vogtle Nuclear Power Plant Secretary Chu Visits Vogtle Nuclear Power Plant February 15, 2012 - 3:54pm Addthis Secretary Chu traveled to Waynesboro, Georgia, to visit the Vogtle nuclear power plant, the site of what will be the first new nuclear reactors to be built in the United States in three decades. | Image credit: Southern Company. Secretary Chu traveled to Waynesboro, Georgia, to visit the Vogtle nuclear power plant, the site of what will be the first new nuclear reactors to be built in the United States in three decades. | Image credit: Southern Company. Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Just over 60 years ago, scientists in Arco, Idaho, successfully used nuclear energy to power four light bulbs, laying the foundation for U.S.

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Chapter 20 - Uranium Enrichment Decontamination & Decommissioning Fund  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0. Uranium Enrichment Decontamination and Decommissioning Fund 20-1 0. Uranium Enrichment Decontamination and Decommissioning Fund 20-1 CHAPTER 20 URANIUM ENRICHMENT DECONTAMINATION AND DECOMMISSIONING FUND 1. INTRODUCTION. a. Purpose. To establish policies and procedures for the financial management, accounting, budget preparation, cash management of the Uranium Enrichment Decontamination and Decommissioning Fund, referred to hereafter as the Fund. b. Applicability. This chapter applies to all Departmental elements, including the National Nuclear Security Administration, and activities that are directly or indirectly involved with the Fund. c. Requirements and Sources of the Fund. (1) The Energy Policy Act of 1992 (EPACT) requires DOE to establish and administer the Fund. EPACT authorizes that the

462

Groundwater Protection Guidelines for Nuclear Power Plants: Revision 1  

Science Conference Proceedings (OSTI)

The United States nuclear power industry has undertaken a Groundwater Protection Initiative [NEI 07-07] at the direction of the Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC). International nuclear power plants implement groundwater protection programs to ensure appropriate management of on-site groundwater and protection of the public and environment. This Electric Power Research Institute (EPRI) guideline provides essential technical guidance to utilities on the ...

2013-10-29T23:59:59.000Z

463

Environmental Costs and Benefits Case Study : Nuclear Power Plant : Quantifications and Economic Valuation of Selected Environmental Impacts/Effects. Final Report.  

SciTech Connect

This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references.

United States. Bonneville Power Administration. Office of Power and Resources Management.

1984-02-01T23:59:59.000Z

464

Technology Requirements for In-Situ Decommissioning Workshop Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-00269, Rev. 0 09-00269, Rev. 0 KEY WORDS: DOE-HQ In situ Decommissioning Entombment Workshop TECHNOLOGY REQUIREMENTS FOR IN SITU DECOMMISSIONING (ISD) WORKSHOP REPORT Patricia L. Lee, John B. Gladden, G. Timothy Jannik, Christine A. Langton, Michael G. Serrato, SRNL Chuck Urland, Erick Reynolds, PEC June 2009 Savannah River National Laboratory Savannah River Nuclear Solutions Savannah River Site

465

Decontamination and decommissioning experience at Experimental Breeder Reactor No. 1  

SciTech Connect

A description is presented of the experience obtained from decontamination and decommissioning of the Experimental Breeder Reactor No. 1 located at the Idaho Nuclear Engineering Laboratory, Scottsville, Idaho. Included are the planning, preparation, and operations associated with the removal and processing of radioactively contaminated sodium-potassium eutectic alloy (NaK) and decontamination and decommissioning of the facility. (auth)

Kendall, E.W.

1975-09-01T23:59:59.000Z

466

Decommissioning Benchmarking Study Final Report  

Energy.gov (U.S. Department of Energy (DOE))

DOE's former Office of Environmental Restoration (EM-40) conducted a benchmarking study of its decommissioning program to analyze physical activities in facility decommissioning and to determine...

467

10 CFR Part 830, Nuclear Safety Management  

NLE Websites -- All DOE Office Websites (Extended Search)

construction such as environmental restoration activities, decontamination and decommissioning activities, specific nuclear explosives operations, or transition...

468

Nuclear Power and the World's Energy Requirements  

E-Print Network (OSTI)

The global requirements for energy are increasing rapidly as the global population increases and the under-developed nations become more advanced. The traditional fuels used in their traditional ways will become increasingly unable to meet the demand. The need for a review of the energy sources available is paramount, although the subsequent need to develop a realistic strategy to deal with all local and global energy requirements is almost as important. Here attention will be restricted to examining some of the claims and problems of using nuclear power to attempt to solve this major question.

V. Castellano; R. F. Evans; J. Dunning-Davies

2004-06-10T23:59:59.000Z

469

Power generation from nuclear reactors in aerospace applications  

SciTech Connect

Power generation in nuclear powerplants in space is addressed. In particular, the states of technology of the principal competitive concepts for power generation are assessed. The possible impact of power conditioning on power generation is also discussed. For aircraft nuclear propulsion, the suitability of various technologies is cursorily assessed for flight in the Earth's atmosphere. A program path is suggested to ease the conditions of first use of aircraft nuclear propulsion.

English, R.E.

1982-01-01T23:59:59.000Z

470

Power generation from nuclear reactors in aerospace applications  

SciTech Connect

Power generation in nuclear powerplants in space is addressed. In particular, the states of technology of the principal competitive concepts for power generation are assessed. The possible impact of power conditioning on power generation is also discussed. For aircraft nuclear propulsion, the suitability of various technologies is cursorily assessed for flight in the Earth's atmosphere. A program path is suggested to ease the conditions of first use of aircraft nuclear propulsion.

English, R.E.

1982-01-01T23:59:59.000Z

471

Notice of Intent to Prepare an Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (3/13/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Federal Register / Vol. 68, No. 49 / Thursday, March 13, 2003 / Notices Dated: March 6, 2003. Gerald A. Reynolds, Assistant Secretary for Civil Rights. [FR Doc. 03-5999 Filed 3-12-03; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Notice of Intent to Prepare an Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center AGENCY: Department of Energy. ACTION: Notice of Intent. SUMMARY: The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project (WVDP) and

472

Prospects for U.S. Nuclear Power After Fukushima  

E-Print Network (OSTI)

The prospects for a revival of U.S. nuclear power were dim even before the tragic events at the Fukushima nuclear plant. Nuclear power has long been controversial because of concerns about nuclear accidents, proliferation risk, and the storage of spent fuel. These concerns are real and important. In the end, however, the key challenge for U.S. nuclear power is the high cost of construction for nuclear reactors. This article reviews the historical record of reactor orders and construction costs in the United States, highlighting some of the insights from the cancellations and cost overruns that have characterized the industry.

Lucas W. Davis; Lucas W. Davis

2011-01-01T23:59:59.000Z

473

Energy Department Nuclear Systems Are Powering Mars Rover | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Nuclear Systems Are Powering Mars Rover Department Nuclear Systems Are Powering Mars Rover Energy Department Nuclear Systems Are Powering Mars Rover November 28, 2011 - 12:14pm Addthis Washington, D.C. - The Mars Science Laboratory rover, which launched from Cape Canaveral this weekend, is powered by nuclear systems developed by the U.S. Department of Energy (DOE), marking the 28th space mission supported by nuclear energy. This year also marks the 50th anniversary of nuclear-powered space exploration. To commemorate the launch, DOE released a new video highlighting this legacy and the Department's work designing these advanced systems. "For the last 50 years, this technology has supported the peaceful use of nuclear power for space exploration, helping to shape the world's understanding of our solar system," said U.S. Energy Secretary Steven

474

Energy Department Nuclear Systems Are Powering Mars Rover | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Nuclear Systems Are Powering Mars Rover Energy Department Nuclear Systems Are Powering Mars Rover Energy Department Nuclear Systems Are Powering Mars Rover November 28, 2011 - 2:00pm Addthis The Mars Science Laboratory rover, which launched from Cape Canaveral this weekend, is powered by nuclear systems developed by the U.S. Department of Energy (DOE), marking the 28th space mission supported by nuclear energy. This year also marks the 50th anniversary of nuclear-powered space exploration. To commemorate the launch, DOE released a new video highlighting this legacy and the Department's work designing these advanced systems. "For the last 50 years, this technology has supported the peaceful use of nuclear power for space exploration, helping to shape the world's understanding of our solar system," said U.S. Energy Secretary Steven

475

Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) Incentive Cost Recovery Rule for Nuclear Power Generation (Louisiana) < Back Eligibility Commercial Construction Industrial Utility Program Info State Louisiana Program Type Fees Generating Facility Rate-Making Provider Louisiana Public Service Commission The Incentive Cost Recovery Rule for Nuclear Power Generation establishes guidelines for any utility seeking to develop a nuclear power plant in Louisiana. The rule clarifies, as well as supplements the Louisiana Public Service Commission's 1983 General Order for the acquisition of nuclear generation resources. The goal of the rule is to provide a transparent process that identifies the responsibilities parties in the regulatory

476

Financial and ratepayer impacts of nuclear power plant regulatory reform  

SciTech Connect

Three reports - ''The Future Market for Electric Generating Capacity,'' ''Quantitative Analysis of Nuclear Power Plant Licensing Reform,'' and ''Nuclear Rate Increase Study'' are recent studies performed by the Los Alamos National Laboratory that deal with nuclear power. This presents a short summary of these three studies. More detail is given in the reports.

Turpin, A.G.

1985-01-01T23:59:59.000Z

477

Nuclear reactor power for an electrically powered orbital transfer vehicle  

DOE Green Energy (OSTI)

To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low Earth orbit (LEO) and geosynchronous Earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to Earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant.

Jaffe, L.; Beatty, R.; Bhandari, P.; Chow, E.; Deininger, W.; Ewell, R.; Fujita, T.; Grossman, M.; Kia, T.; Nesmith, B.

1987-01-01T23:59:59.000Z

478

Microsoft PowerPoint - Why Nuclear Energy New Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Nuclear Energy? Why Nuclear Energy? Why Nuclear Energy? Nuclear energy already meets a significant share of the world's energy needs * There are 441 nuclear reactors in operation in 31 countries * These plants generate electricity for nearly a billion people, and account for 17% of the world's electricity production * The U.S. has 103 operating reactors producing 20% of the nation's electricity * Illinois leads all states with the highest share of nuclear (51%) * Technology significantly developed at Argonne forms the basis of all nuclear energy systems used worldwide Nuclear power is reliable and economical * In 2001, U.S. nuclear plants produced electricity for 1.68 cents per kilowatt-hour on average, second only to hydroelectric power among baseload generation options * U.S. nuclear power plant performance has steadily

479

Khalil named co-director of the Center for Advanced Nuclear Fuel...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

480

Experimental Resources for Nuclear Data Studies in the U.S. ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

Note: This page contains sample records for the topic "decommissioned nuclear power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Peters and Fanning appear on NBC-5 report on Illinois nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

482

VERMONT YANKEE NUCLEAR POWER STATION- NRC LICENSE  

E-Print Network (OSTI)

your application for a renewed license of your Vermont Yankee Nuclear Power Station. The enclosed report documents the result of the inspection which was discussed with members of your staff on May 24, 2007, at a publicly observed exit meeting conducted at the Latchis Theater in Brattleboro, VY. The purpose of this inspection was to examine the plant activities and documents that supported the application for a renewed license of the Vermont Yankee Nuclear Power Station. The inspection reviewed the screening and scoping of non-safety related systems, structures, and components, as required in 10 CFR 54.4(a)(2), and determined whether the proposed aging management programs are capable of reasonably managing the effects of aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications. The inspection team concluded screening and scoping of nonsafety-related systems, structures, and components, were implemented as required in 10 CFR 54.4(a)(2), and the aging management portions of the license renewal activities were conducted as described in the License Renewal Application. The inspection results supported a conclusion that the

Mr. Theodore; A. Sullivan

2007-01-01T23:59:59.000Z

483

Analysis of nuclear power plant construction costs  

SciTech Connect

The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

1986-01-01T23:59:59.000Z

484

Policy Statement 3, Board Oversight of Department of Energy Decommissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Date: August 19, 1996 Subject Policy Statement on Board oversight of Department of Energy decommissioning activities at defense