Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

Science Conference Proceedings (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

2

Record of Decision for the Electrical Interconnection of the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the regional electric energy need in the dynamic West Coast energy market. The analysis focused on the relationships among BPA, the utility market, and the affected...

3

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

DOE Green Energy (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

4

Record of Decision for the Electrical Interconnection of Goldendale Energy Project (DOE/EIS-0183) (03/20/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision for the Electrical Record of Decision for the Electrical Interconnection of Goldendale Energy Project SUMMARY Bonneville Power Administration (BPA) has decided to offer terms for integrating power from the Goldendale Energy Project (GEP) into the Federal Columbia River Transmission System (FCRTS). BPA will offer contracts integrating power from GEP into the FCRTS for delivery to the wholesale power market. In reaching this decision, I have considered the potential environmental impacts addressed in BPA's Business Plan Environmental Impact Statement (BP EIS, DOE/EIS-0183) and a Supplement Analysis (DOE/EIS-0183/SA-03). I have also considered input from the public process for the GEP. BPA will distribute this Record of Decision (ROD) to all known interested and affected persons, Tribes, and agencies and will publish a notice of its availability in the

5

Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility (DOE/EIS-0345)(10/14/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the Electrical Interconnection of the Plymouth Generating Facility October 2003 THE DECISION The Bonneville Power Administration (BPA) has decided to implement the proposed action identified in the Plymouth Generating Facility (PGF) Final Environmental Impact Statement (FEIS) (DOE/EIS-0345, June 2003). The PGF, which has been proposed by Plymouth Energy, LLC (Plymouth Energy), involves construction and operation of a 307-megawatt (MW) natural gas-fired, combined-cycle power generation facility on a 44.5-acre site 2 miles west of Plymouth in Benton County, Washington. Under the proposed action, BPA will offer contract terms for interconnection of the PGF into the Federal Columbia River Transmission System (FCRTS) at BPA's proposed McNary-John Day 500-kilovolt (kV) transmission line at a point approximately

6

Record of Decision for the Electrical Interconnection of the Chehalis Generation Facility (DOE/EIS-0230)(5/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Chehalis Generation Facility May 2001 _______________________________________________________ SUMMARY Bonneville Power Administration (BPA) has decided to offer contracts for integrating power from the Chehalis Generation Facility (CGF) into the Federal Columbia River Transmission System (FCRTS). These contracts will facilitate integration of power from CGF into the FCRTS for delivery to the wholesale power market. In reaching this decision, I have considered the potential environmental impacts addressed in BPA's Resource Contingency Program Environmental Impact Statement (RCP EIS, DOE/EIS-0230, November 1995), Supplement Analysis (SA, DOE/EIS-0230/SA-02, May 9, 2001), BPA's Business Plan Environmental Impact Statement (BP EIS, DOE/EIS-

7

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343)  

Science Conference Proceedings (OSTI)

The COB Energy Facility would be constructed on a site near the rural community of Bonanza, in Klamath County, Oregon. Generating components of the project would be constructed in either one or two phases, including four air-cooled combustion turbine generators fueled with natural gas, four heat recovery steam generators, and two steam turbines. Additional facilities include a new 7.2-mile-long 500-kV transmission line, a new 4.1-mile-long natural gas pipeline, a 2.8-mile-long water pipeline, a 20-acre wastewater evaporation pond or a 3,770-foot-long irrigation pipeline to deliver wastewater to a 31-acre pasture, a 4.7-acre stormwater infiltration basin, a 1.5-acre stormwater retention pond, and various tanks, buildings, exhaust stacks, parking, and storage areas. Natural gas to fuel the combustion turbines would be supplied by way of a new 4.1-mile-long, 20-inch-diameter pipeline from a Gas Transmission Northwest's Bonanza Compressor Station. The new pipeline would be constructed within private easements adjacent to or near Klamath County road rights-of-way. Although COB Energy Facility generators would use air-cooled condensers, the project would use an average of 72 gallons per minute for steam production and station service, up to a maximum of 210 gallons per minute. The source of this water would be one existing and two new wells near the project site, drawing from a deep aquifer consistent with a State of Oregon water right permit expected to be incorporated into the State energy facility site certificate. Process wastewater would either be used to irrigate pasture or held in a lined pond to evaporate. Sanitary water would be routed to an onsite septic tank then discharged to a leach field. No wastewater would be discharged to surface waters. The COB Energy Facility would interconnect to the FCRTS at Captain Jack Substation, 7.2 miles south of the project site. PERC would construct a new 500-kV transmission line from the project site to Captain Jack Substation. Part of the transmission line would cross public land managed by the Bureau of Land Management. BPA would install additional electrical equipment at Captain Jack Substation. At this time, PERC has not requested specific points of delivery.

N /A

2004-08-20T23:59:59.000Z

8

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (10/21/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new

9

DOE/EIS-0183: Record of Decision for the Electrical Interconnection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the regional electric energy need in the dynamic West Coast energy market. The analysis focused on the relationships among BPA, the utility market, and the affected...

10

Record of Decision for the Electrical Interconnection of the COB Energy Facility (DOE/EIS-0343) (08/20/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COB Energy Facility COB Energy Facility DECISION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the COB Energy Facility with the Federal Columbia River Transmission System (FCRTS), as proposed in the COB Energy Facility Final Environmental Impact Statement (FEIS) (DOE/EIS-0343, June 2004). Proposed by Peoples Energy Resources Company (PERC), the COB Energy Facility involves constructing and operating a new 1,160- megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 50.6-acre site near Bonanza in Klamath County, Oregon, and a 7.2-mile-long 500-kilovolt (kV) transmission line south to BPA's Captain Jack Substation. A Generation Interconnection Agreement with PERC would provide for interconnection of the COB Energy Facility with the FCRTS and

11

Process for electrically interconnecting electrodes  

SciTech Connect

Electrical interconnects for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb--Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb--Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value.

Carey, Paul G. (Mountain View, CA); Thompson, Jesse B. (Brentwood, CA); Colella, Nicolas J. (Livermore, CA); Williams, Kenneth A. (Livermore, CA)

2002-01-01T23:59:59.000Z

12

Analysis of electric vehicle interconnection with commercial  

E-Print Network (OSTI)

Analysis of electric vehicle interconnection with commercial building microgrids Michael Stadler, process, or service by its trade name, trademark, manufacturer, or otherwise, does not necessarily Laboratories America Inc. Analysis of electric vehicle interconnection with commercial building microgrids

13

USLCI Interconnect Region Electricity datasets, 2008 Datasets...  

Open Energy Info (EERE)

spreadsheet are also included.

Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year...

14

Smart buildings with electric vehicle interconnection as buffer...  

NLE Websites -- All DOE Office Websites (Extended Search)

buildings with electric vehicle interconnection as buffer for local renewables? Title Smart buildings with electric vehicle interconnection as buffer for local renewables?...

15

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

16

Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (DOE/EIS-0183)(10/19/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. The West Coast is experiencing a shortfall in electric energy supply, as well as a volatile wholesale power market in which prices have reached record highs. The Project is one of

17

Laser welding of electrical interconnections  

SciTech Connect

Processes and equipment have been developed for welding thin aluminum and copper foils using a Nd : YAG laser. Laser welding provides an alternate technique with improved quality for welding these types of electrical terminations.

Bauer, F.R.

1978-12-01T23:59:59.000Z

18

Record of Decision for the Electrical Interconnection of the BP Cherry Point Cogeneration Project (DOE/EIS-0349) (11/10/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Cherry Poi BP Cherry Poi nt Cogeneration Project DECISION The Bonneville Power Administration (Bonneville) has decided to implement the proposed action identified in the BP Cherry Point Cogeneration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0349, August 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the BP Cherry Point Cogeneration Project (Project) with the Federal Columbia River Transmission System (FCRTS), as requested by BP West Coast Products, LLC (BP) and proposed in the FEIS. The proposed Project involves constructing and operating a new 720-megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 265-acre site adjacent to BP's existing Cherry Point Refinery between Ferndale and

19

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

20

Notice of Availability of the Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project -- Business Plan Final EIS (DOE/EIS-0183) (10/29/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45 45 Federal Register / Vol. 69, No. 209 / Friday, October 29, 2004 / Notices Issued at Washington, DC on October 26, 2004. Rachel M. Samuel, Deputy Advisory Committee Management Officer. [FR Doc. 04-24217 Filed 10-28-04; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Bonneville Power Administration; Summit/Westward Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Revised Record of Decision (ROD). SUMMARY: This notice announces the availability of the Revised ROD to offer contract terms for an optional electrical interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at a point near the existing Wauna Substation of the Clatskanie

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

22

DOE/EIS-0183 Record of Decision for the Electrical Interconnection of the Kittitas Valley Wind Project (09/04/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kittitas Valley Wind Project Kittitas Valley Wind Project September 2009 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 108 megawatts (MW) of power to be generated by the proposed Kittitas Valley Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Sagebrush Power Partners, LLC (Sagebrush) has received authorization from the Washington Energy Facility Site Evaluation Council (EFSEC) to construct and operate the proposed Wind Project in Kittitas County, Washington, and has requested interconnection to the FCRTS on BPA's Columbia-Covington 230-kV transmission line in the vicinity of Ellensburg, Washington. BPA will construct a new substation to accommodate this additional power into the

23

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

24

Integration and electrical characterization of carbon nanotube via interconnects  

Science Conference Proceedings (OSTI)

Carbon nanotubes (CNTs) are considered a promising material for interconnects in the future generations of microchips because of their low electrical resistance and excellent mechanical stability. In particular, CNT-based contacts appear advantageous ... Keywords: CNT, Carbon nanotubes, Contact, Electrical characterization, Integration, Interconnect

Nicolo' Chiodarelli; Yunlong Li; Daire J. Cott; Sofie Mertens; Nick Peys; Marc Heyns; Stefan De Gendt; Guido Groeseneken; Philippe M. Vereecken

2011-05-01T23:59:59.000Z

25

USLCI Interconnect Region Electricity datasets, 2008 | OpenEI  

Open Energy Info (EERE)

76 76 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142278976 Varnish cache server USLCI Interconnect Region Electricity datasets, 2008 Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included.Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year 2008 mix of fuels used for utility generations for each of the interconnect regions and is based on the EIA electricity reports for all power plants in the US. Detailed information on the methodology is included in the module report and detailed spreadsheet.

26

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

Modeling of Plug-in Electric Vehicle Interactions with aV. (2010). Plug-in Electric Vehicle Interactions with aof Smart Grids with Electric Vehicle Interconnection M.

Stadler, Michael

2012-01-01T23:59:59.000Z

27

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

28

Smart buildings with electric vehicle interconnection as buffer for local renewables?  

E-Print Network (OSTI)

Smart buildings with electric vehicle interconnection as buffer for local renewables? Michael, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement and partly by NEC Laboratories America Inc. Smart buildings with electric vehicle interconnection as buffer

29

Electric System Decision Making in Other Regions: A Preliminary Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decision Making in Other Regions: A Preliminary Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation Electric System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation The nation's electricity system is regional in nature, because of the operation of the interconnected grids and the markets defined by them. Over the years, many regional organizations of utilities and governments have formed to manage and oversee these markets. Electric System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation More Documents & Publications

30

Electrical isolation of component cells in monolithically interconnected modules  

DOE Patents (OSTI)

A monolithically interconnected photovoltaic module having cells which are electrically connected which comprises a substrate, a plurality of cells formed over the substrate, each cell including a primary absorber layer having a light receiving surface and a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, and a cell isolation diode layer having a p-region, formed with a p-type dopant, and an n-region formed with an n-type dopant adjacent the p-region to form a single pn-junction, the diode layer intervening the substrate and the absorber layer wherein the absorber and diode interfacial regions of a same conductivity type orientation, the diode layer having a reverse-breakdown voltage sufficient to prevent inter-cell shunting, and each cell electrically isolated from adjacent cells with a vertical trench trough the pn-junction of the diode layer, interconnects disposed in the trenches contacting the absorber regions of adjacent cells which are doped an opposite conductivity type, and electrical contacts.

Wanlass, Mark W. (Golden, CO)

2001-01-01T23:59:59.000Z

31

Comparing Decision Rules for Siting Interconnected Wind Farms  

Science Conference Proceedings (OSTI)

The variability and non-dispatchability of wind power creates many challenges for the operators of electric transmission systems. Current U.S. wind energy policies are focused on encouraging quantities of wind power without much attention paid to quality ...

Paras Choudhary; Seth Blumsack; George Young

2011-01-01T23:59:59.000Z

32

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

33

Electrical Contacts between Cathodes and Metallic Interconnects in Solid Oxide Fuel Cells  

Science Conference Proceedings (OSTI)

To minimize electrical resistance, contact layers are often included between interconnects and electrodes during construction of a SOFC stack. In this work, simulated cathode/interconnect structures were used to investigate the effects of different contact materials on the contact resistance between a LSF cathode and a Crofer22 APU interconnect.. The results from the resistance measurements are reported and correlated to interfacial interactions occurring between the metallic interconnect and the contact materials, particularly perovskites. The materials requirements for the contact layers between cathodes and metallic interconnects in intermediate temperature SOFCs are also discussed.

Yang, Z Gary; Xia, Gordon; Singh, Prabhakar; Stevenson, Jeffry W.

2006-04-21T23:59:59.000Z

34

Integration of Distributed Resources in Electric Utility Systems: Current Interconnection Practice and Unified Approach  

Science Conference Proceedings (OSTI)

Accelerating commercialization of distributed resources (DR) has created the need for improved practices for interconnecting them with electric utility distribution systems. An assessment of current practice is provided, and a unified approach is recommended to achieve greater consistency. This report is a tool that readers can use to simplify their efforts in resolving DR interconnection problems.

1999-03-11T23:59:59.000Z

35

RESEARCH CALL TO DOE/FEDERAL LABORATORIES Technical Support for Interconnection-Level Electric Infrastructure Planning  

E-Print Network (OSTI)

on electricity demand, and comparison of utility resource plans · Water/energy nexus · Technical assistance-year period covered by this research call. Area of Interest 2: New Technologies, Electricity Demand, and Utility Resource Plans a) Western Interconnection Project 1 - New Technologies and Electricity Demand Need

36

National Electric Transmission Study 2006 Western Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

37

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

Division Building / tariffs electricity and gas loads for afeed-in tariff -ZNEB Storage and DR constraints -electricity

Stadler, Michael

2011-01-01T23:59:59.000Z

38

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

Outline global concept of microgrid and electric vehicle (services to a building microgrid produces technology neutral

Stadler, Michael

2011-01-01T23:59:59.000Z

39

Renewable Generation and Interconnection to the Electrical Grid in Southern California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOUTHERN CALIFORNIA EDISON® SOUTHERN CALIFORNIA EDISON® SM 1 Federal Utility Partnership Working Group Providence, Rhode Island April 15, 2010 Renewable Generation and Interconnection to the Electrical Grid in Southern California Daniel Tunnicliff, P.E. Manager, Government & Institutions SOUTHERN CALIFORNIA EDISON® SM 2 Overview * SCE Overview * SCE Procurement Objectives * Renewable Procurement * Challenges to Meeting Renewable Goals in California * Interconnection Processes * Lessons Learned SOUTHERN CALIFORNIA EDISON® SM 3 SCE Overview * Large system  13 million residents  4.8 million customer accounts  50,000-square-mile service area * Nation's leader in environmental solutions  Energy efficiency  Renewable energy procurement  Electric transportation  Advanced meters  Smart grid

40

EIS-0230: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Record of Decision EIS-0230: Record of Decision Electrical Interconnection of the Chehalis Generation Facility Bonneville Power Administration (BPA) has decided to offer...

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0372: Record of Decision and Floodplain Statement of Findings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Findings EIS-0372: Record of Decision and Floodplain Statement of Findings Bangor Hydro-Electric Company Northeast Reliability Interconnect DOE announces its decision to...

42

Brazil and the electrical interconnections in the Mercosul Region  

Science Conference Proceedings (OSTI)

This article describes the state of relations among the four countries that form Mercosul, the common market that is being formed by Argentina, Brazil, Paraguay, and Uruguay, and the prospects for expansion of international electric energy commerce and exchanges in that region. The first part presents the main supply facilities already available, including hydroelectric power plants, power stations, frequency conversion stations, and transmission lines. The second part focuses on the status of the Brazilian electric power sector and analyzes some of its features that are considered to be an incentive to the expansion of the electric energy international commerce in the Mercosul region.

Alqueres, J.L.

1994-06-01T23:59:59.000Z

43

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

Energy Technologies Division Building / tariffs electricityOptions, Tariffs, and Building Analyzed Environmental Energyenergy management more effective stationary storage will be charged by PV, mobile only marginally results will depend on the considered region and tariff

Stadler, Michael

2011-01-01T23:59:59.000Z

44

Synthesis of electrical networks interconnecting PZT actuators to damp mechanical vibrations  

E-Print Network (OSTI)

This paper proves that it is possible to damp mechanical vibrations of some beam frames by means of piezoelectric actuators interconnected via passive networks. We create a kind of electromechanical wave guide where the electrical velocity group equals the mechanical one thus enabling an electromechanical energy transfer. Numerical simulations are presented which prove the technical feasibility of proposed device

dell'Isola, F; Porfiri, M

2010-01-01T23:59:59.000Z

45

Synthesis of electrical networks interconnecting PZT actuators to damp mechanical vibrations  

E-Print Network (OSTI)

This paper proves that it is possible to damp mechanical vibrations of some beam frames by means of piezoelectric actuators interconnected via passive networks. We create a kind of electromechanical wave guide where the electrical velocity group equals the mechanical one thus enabling an electromechanical energy transfer. Numerical simulations are presented which prove the technical feasibility of proposed device

F. dell'Isola; E. G. Henneke; M. Porfiri

2010-08-30T23:59:59.000Z

46

Analysis of electric vehicle interconnection with commercial building microgrids  

Science Conference Proceedings (OSTI)

The outline of this presentation is: (1) global concept of microgrid and electric vehicle (EV) modeling; (2) Lawrence Berkeley National Laboratory's Distributed Energy Resources Customer Adoption Model (DER-CAM); (3) presentation summary - how does the number of EVs connected to the building change with different optimization goals (cost versus CO{sub 2}); (3) ongoing EV modeling for California: the California commercial end-use survey (CEUS) database, objective: 138 different typical building - EV connections and benefits; (4) detailed analysis for healthcare facility: optimal EV connection at a healthcare facility in southern California; and (5) conclusions. Conclusions are: (1) EV Charging/discharging pattern mainly depends on the objective of the building (cost versus CO{sub 2}); (2) performed optimization runs show that stationary batteries are more attractive than mobile storage when putting more focus on CO{sub 2} emissions. Why? Stationary storage is available 24 hours a day for energy management - more effective; (3) stationary storage will be charged by PV, mobile only marginally; (4) results will depend on the considered region and tariff - final work will show the results for 138 different buildings in nine different climate zones and three major utility service territories.

Stadler, Michael; Mendes, Goncalo; Marnay, Chris; M& #233; gel, Olivier; Lai, Judy

2011-04-01T23:59:59.000Z

47

Electric System Decision Making in Other Regions: A Preliminary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric Power Cooperation Electric System Decision Making in Other Regions: A Preliminary...

48

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet Northeast Reliability Interconnect DEIS Sheet Northeast Reliability Interconnect DEIS iii COVER SHEET Responsible Federal Agency: U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Cooperating Agencies: U.S. Department of the Interior, U.S. Fish and Wildlife Service (USFWS) and U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Marine Fisheries Service (NOAA Fisheries) Title: Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect Location: Hancock, Penobscot, and Washington Counties, Maine. Contacts: For additional information on this Draft Environmental Impact Statement (EIS), contact: Dr. Jerry Pell, Project Manager Office of Electricity Delivery and Energy

49

Monolithic interconnected module with a tunnel junction for enhanced electrical and optical performance  

SciTech Connect

An improved thermophotovoltaic (TPV) n/p/n device is provided. Monolithic Interconnected Modules (MIMS), semiconductor devices converting infrared radiation to electricity, have been developed with improved electrical and optical performance. The structure is an n-type emitter on a p-type base with an n-type lateral conduction layer. The incorporation of a tunnel junction and the reduction in the amount of p-type material used results in negligible parasitic absorption, decreased series resistance, increased voltage and increased active area. The novel use of a tunnel junction results in the potential for a TPV device with efficiency greater than 24%.

Murray, Christopher S. (Bethel Park, PA); Wilt, David M. (Bay Village, OH)

2000-01-01T23:59:59.000Z

50

A Monolithic Interconnected module with a tunnel Junction for Enhanced Electrical and Optical Performance  

DOE Patents (OSTI)

An improved thermophotovoltaic (TPV) n/p/n device is provided. Monolithic Interconnected Modules (MIMs), semiconductor devices converting infrared radiation to electricity, have been developed with improved electrical and optical performance. The structure is an n-type emitter on a p-type base with an n-type lateral conduction layer. The incorporation of a tunnel junction and the reduction in the amount of p-type material used results in negligible parasitic absorption, decreased series resistance, increased voltage and increased active area. The novel use of a tunnel junction results in the potential for a TPV device with efficiency greater than 24%.

Murray, Christopher Sean; Wilt, David Morgan

1999-06-30T23:59:59.000Z

51

Interconnection | Open Energy Information  

Open Energy Info (EERE)

Interconnection Interconnection Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some state’ standards apply only to investor-owned utilities, – not to municipal utilities and electric cooperatives. [1]

52

Oxidation Resistant, Cr Retaining, Electrically Conductive Coatings on Metallic Alloys for SOFC Interconnects  

DOE Green Energy (OSTI)

This report describes significant results from an on-going, collaborative effort to enable the use of inexpensive metallic alloys as interconnects in planar solid oxide fuel cells (SOFCs) through the use of advanced coating technologies. Arcomac Surface Engineering, LLC, under the leadership of Dr. Vladimir Gorokhovsky, is investigating filtered-arc and filtered-arc plasma-assisted hybrid coating deposition technologies to promote oxidation resistance, eliminate Cr volatility, and stabilize the electrical conductivity of both standard and specialty steel alloys of interest for SOFC metallic interconnect (IC) applications. Arcomac has successfully developed technologies and processes to deposit coatings with excellent adhesion, which have demonstrated a substantial increase in high temperature oxidation resistance, stabilization of low Area Specific Resistance values and significantly decrease Cr volatility. An extensive matrix of deposition processes, coating compositions and architectures was evaluated. Technical performance of coated and uncoated sample coupons during exposures to SOFC interconnect-relevant conditions is discussed, and promising future directions are considered. Cost analyses have been prepared based on assessment of plasma processing parameters, which demonstrate the feasibility of the proposed surface engineering process for SOFC metallic IC applications.

Vladimir Gorokhovsky

2008-03-31T23:59:59.000Z

53

Vibration control in plates by uniformly distributed PZT actuators interconnected via electric networks  

E-Print Network (OSTI)

In this paper a novel device aimed at controlling the mechanical vibrations of plates by means of a set of electrically-interconnected piezoelectric actuators is described. The actuators are embedded uniformly in the plate wherein they connect every node of an electric network to ground, thus playing the two-fold role of capacitive element in the electric network and of couple suppliers. A mathematical model is introduced to describe the propagation of electro-mechanical waves in the device; its validity is restricted to the case of wave-forms with wave-length greater than the dimension of the piezoelectric actuators used. A self-resonance criterion is established which assures the possibility of electro-mechanical energy exchange. Finally the problem of vibration control in simply supported and clamped plates is addressed; the optimal net-impedance is determined. The results indicate that the proposed device can improve the performances of piezoelectric actuation

Stefano Vidoli; Francesco dell'Isola

2010-07-09T23:59:59.000Z

54

Vibration control in plates by uniformly distributed PZT actuators interconnected via electric networks  

E-Print Network (OSTI)

In this paper a novel device aimed at controlling the mechanical vibrations of plates by means of a set of electrically-interconnected piezoelectric actuators is described. The actuators are embedded uniformly in the plate wherein they connect every node of an electric network to ground, thus playing the two-fold role of capacitive element in the electric network and of couple suppliers. A mathematical model is introduced to describe the propagation of electro-mechanical waves in the device; its validity is restricted to the case of wave-forms with wave-length greater than the dimension of the piezoelectric actuators used. A self-resonance criterion is established which assures the possibility of electro-mechanical energy exchange. Finally the problem of vibration control in simply supported and clamped plates is addressed; the optimal net-impedance is determined. The results indicate that the proposed device can improve the performances of piezoelectric actuation

Vidoli, Stefano

2010-01-01T23:59:59.000Z

55

Interconnect Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decisions lay foundation for exception for utility contracts * Narrow exception GSA - Utility Interconnection Agreements * Application to Interconnection Agreements * Keys: Requirement for service Tariff or PSC action on contract

56

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GEP into the FCRTS for delivery to the wholesale power market. DOEEIS-0183, Bonneville Power Administration, Record of Decision for the Electrical Interconnection of Goldendale...

57

EIS-0345: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement (FEIS) (DOEEIS-0345, June 2003). Record of Decision for the Electrical Interconnection of the Plymouth Generating Facility, DOEEIS-0345 (October...

58

EIS-0349: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project The Bonneville Power Administration (Bonneville) has decided to implement...

59

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State California Program Type Interconnection Provider California Public Utilities Commission '''''Note: The California Public Utilities Commission (CPUC) approved a [http://docs.cpuc.ca.gov/EFILE/MOTION/162852.PDF proposed settlement] in September 2012, enacting the first fundamental redesign of Rule 21 since 2000. The complete revised Rule 21 Tariff, as described at a high level below, can be found beginning on page 136 of CPUC Decision 12-09-018. The individual tariffs adopted by the utilities can be found on the CPUC web

60

DOE/EIS-0372; Draft Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (August 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast Reliability Interconnect DEIS Northeast Reliability Interconnect DEIS S-1 August 2005 SUMMARY S.1 BACKGROUND S.1.1 Purpose and Need for National Environmental Policy Act Review Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by the U.S. Department of Energy (DOE) before electric transmission facilities may be constructed, operated, maintained, or connected at the U.S. international border. Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit, 345,000-volt (345-kV) alternating-current (AC) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine.

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy and water in the Western and Texas interconnects.  

Science Conference Proceedings (OSTI)

The Department of Energy's Office of Electricity has initiated a $60M program to assist the electric industry in interconnection-level analysis and planning. The objective of this effort is to facilitate the development or strengthening of capabilities in each of the three interconnections serving the lower 48 states of the United States, to prepare analyses of transmission requirements under a broad range of alternative futures and develop long-term interconnection-wide transmission expansion plans. The interconnections are the Western Interconnection, the Eastern Interconnection, and the Texas Interconnection. One element of this program address the support and development of an integrated energy-water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning (the Eastern Interconnection is not participating in this element). Specific objectives include: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between members of this proposal team and the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Electric Reliability Council of Texas (ERCOT) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and ERCOT. The goals of this project are: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between Western Electricity Coordinating Council, Electric Reliability Council of Texas, Western Governors Association, and Western States Water Council. (3) Exercise the Energy-Water DSS to investigate water transmission planning scenarios.

Tidwell, Vincent Carroll

2010-08-01T23:59:59.000Z

62

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

63

Notice of Availability of the Record of Decision for the Arlington Wind Interconnection Project (DOE/EIS-0183) (1/14/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86 86 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices 8. Mr. Mohan Singh, Regional Business Director, North Atlantic Division. Brenda S. Bowen, Army Federal Register Liaison Office. [FR Doc. 05-1383 Filed 1-25-05; 8:45 am] BILLING CODE 3710-08-M DEPARTMENT OF ENERGY Bonneville Power Administration Arlington Wind Interconnection Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms to interconnect up to 200 megawatts of wind generation from the Columbia Energy Partners' proposed Arlington Wind Project into the Federal Columbia River Transmission System. The wind project will be interconnected

64

Incorporating uncertainty into electric utility projections and decisions  

Science Conference Proceedings (OSTI)

This paper focuses on how electric utility companies can respond in their decision making to uncertain variables. Here we take a mean- variance type of approach. The mean'' value is an expected cost, on a discounted value basis. We assume that management has risk preferences incorporating a tradeoff between the mean and variance in the utility's net income. Decisions that utilities are faced with can be classified into two types: ex ante and ex post. The ex ante decisions need to be made prior to the uncertainty being revealed and the ex post decision can be postponed until after the uncertainty is revealed. Intuitively, we can say that the ex ante decisions provide a hedge against the uncertainties and the ex post decisions allow the negative outcomes of uncertain variables to be partially mitigated, dampening the losses. An example of an ex post decision is how the system is operated i.e., unit dispatch, and in some cases switching among types of fuels, say with different sulfur contents. For example, if gas prices go up, natural gas combined cycle units are likely to be dispatched at lower capacity factors. If SO{sub 2} emission allowance prices go up, a utility may seek to switch into a lower sulfur coal. Here we assume that regulated electric utilities do have some incentive to lower revenue requirements and hence an incentive to lower the electric rates needed for the utility to break even, thereby earning a fair return on invested capital. This paper presents the general approach first, including applications to capacity expansion and system dispatch. Then a case study is presented focusing on the 1990 Clean Air Act Amendments including SO{sub 2} emissions abatement and banking of allowances under uncertainty. It is concluded that the emission banking decisions should not be made in isolation but rather all the uncertainties in demand, fuel prices, technology performance etc., should be included in the uncertainty analysis affecting emission banking.

Hanson, D.A.

1992-01-01T23:59:59.000Z

65

Incorporating uncertainty into electric utility projections and decisions  

Science Conference Proceedings (OSTI)

This paper focuses on how electric utility companies can respond in their decision making to uncertain variables. Here we take a mean- variance type of approach. The ``mean`` value is an expected cost, on a discounted value basis. We assume that management has risk preferences incorporating a tradeoff between the mean and variance in the utility`s net income. Decisions that utilities are faced with can be classified into two types: ex ante and ex post. The ex ante decisions need to be made prior to the uncertainty being revealed and the ex post decision can be postponed until after the uncertainty is revealed. Intuitively, we can say that the ex ante decisions provide a hedge against the uncertainties and the ex post decisions allow the negative outcomes of uncertain variables to be partially mitigated, dampening the losses. An example of an ex post decision is how the system is operated i.e., unit dispatch, and in some cases switching among types of fuels, say with different sulfur contents. For example, if gas prices go up, natural gas combined cycle units are likely to be dispatched at lower capacity factors. If SO{sub 2} emission allowance prices go up, a utility may seek to switch into a lower sulfur coal. Here we assume that regulated electric utilities do have some incentive to lower revenue requirements and hence an incentive to lower the electric rates needed for the utility to break even, thereby earning a fair return on invested capital. This paper presents the general approach first, including applications to capacity expansion and system dispatch. Then a case study is presented focusing on the 1990 Clean Air Act Amendments including SO{sub 2} emissions abatement and banking of allowances under uncertainty. It is concluded that the emission banking decisions should not be made in isolation but rather all the uncertainties in demand, fuel prices, technology performance etc., should be included in the uncertainty analysis affecting emission banking.

Hanson, D.A.

1992-07-01T23:59:59.000Z

66

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

67

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

68

An Advanced Decision Support Tool for Electricity Infrastructure Operations  

Science Conference Proceedings (OSTI)

Electricity infrastructure, as one of the most critical infrastructures in the U.S., plays an important role in modern societies. Its failure would lead to significant disruption of peoples lives, industry and commercial activities, and result in massive economic losses. Reliable operation of electricity infrastructure is an extremely challenging task because human operators need to consider thousands of possible configurations in near real-time to choose the best option and operate the network effectively. In todays practice, electricity infrastructure operation is largely based on operators experience with very limited real-time decision support, resulting in inadequate management of complex predictions and the inability to anticipate, recognize, and respond to situations caused by human errors, natural disasters, or cyber attacks. Therefore, a systematic approach is needed to manage the complex operational paradigms and choose the best option in a near-real-time manner. This paper proposes an advanced decision support tool for electricity infrastructure operations. The tool has the functions of turning large amount of data into actionable information to help operators monitor power grid status in real time; performing trend analysis to indentify system trend at the regional level or system level to help the operator to foresee and discern emergencies, studying clustering analysis to assist operators to identify the relationships between system configurations and affected assets, and interactively evaluating the alternative remedial actions to aid operators to make effective and timely decisions. This tool can provide significant decision support on electricity infrastructure operations and lead to better reliability in power grids. This paper presents examples with actual electricity infrastructure data to demonstrate the capability of this tool.

Chen, Yousu; Huang, Zhenyu; Wong, Pak C.; Mackey, Patrick S.; Allwardt, Craig H.; Ma, Jian; Greitzer, Frank L.

2010-01-31T23:59:59.000Z

69

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Indiana Program Type Interconnection Provider Indiana Utility Regulatory Commission In November 2005, the Indiana Utility Regulatory Commission (IURC) approved rules governing the interconnection of distributed generation (DG). Indiana's interconnection rules require the state's investor-owned utilities to provide three levels of interconnection to customer-generators.

70

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Solar Wind Program Info State Nevada Program Type Interconnection Provider Public Utilities Commission of Nevada In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of

71

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Energy Sources Solar Wind Program Info State Maine Program Type Interconnection Provider Maine Public Utilities Commission The Maine Public Utility Commission (PUC) adopted interconnection procedures in January 2010. These rules apply to all transmission and distribution utilities operating in the state and apply to all distribution generation (not just renewables). Maine's interconnection procedures, based in part on the Interstate Renewable Energy Council Inc. 2006 Model Interconnection Procedures,* identify four different tiers with

72

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

of Plug-In Hybrid Electric Vehicles as Grid Resources, Theutilizing plug-in hybrid electric vehicles (PHEVs). Wang etof Recharging Plug-in Hybrid Electric Vehicles on Locational

Stadler, Michael

2012-01-01T23:59:59.000Z

73

Analysis of drought impacts on electricity production in the Western and Texas interconnections of the United States.  

Science Conference Proceedings (OSTI)

Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectri

Harto, C. B.; Yan, Y. E.; Demissie, Y. K.; Elcock, D.; Tidwell, V. C.; Hallett, K.; Macknick, J.; Wigmosta, M. S.; Tesfa, T. K. (Environmental Science Division); (Sandia National Laboratory); (National Renewable Energy Laboratory); (Pacific Northwest National Laboratory)

2012-02-09T23:59:59.000Z

74

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Solar Buying & Making Electricity Home Weatherization Water Wind Program Info State Kentucky Program Type Interconnection Provider Kentucky Public Service Commission In April 2008, Kentucky enacted legislation which required the Kentucky Public Service Commission (PSC) to develop interconnection and net metering guidelines for all retail electric suppliers operating in Kentucky (excluding TVA utilities). The Kentucky PSC adopted those guidelines on January 8, 2009 (Order 2008-00169). The PSC's rules set forth a two-tiered approach to simplify the interconnection process:

75

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Energy Sources Solar Wind Program Info State Delaware Program Type Interconnection Provider Delaware Public Service Commission '''''Note: Delaware law ([http://delcode.delaware.gov/title26/c010/index.shtml#1014 26 Del. C. § 1014]) requires the Delaware Public Service Commission (PSC), Delaware Electric Cooperative (DEC), and municipal utilities to develop interconnection rules using as a guide the Interstate Renewable Energy Council's (IREC) model interconnection rules and the U.S. Department of

76

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Industrial Residential Savings Category Bioenergy Buying & Making Electricity Solar Home Weatherization Water Wind Program Info State Nebraska Program Type Interconnection Provider Nebraska Energy Office Nebraska enacted legislation in May 2009 [http://nebraskalegislature.gov/FloorDocs/101/PDF/Final/LB436.pdf (LB 436)], establishing general rules for interconnecting and net metering systems that generate electricity. Nebraska's policy applies to systems that use solar, wind, methane, biomass, hydropower or geothermal resources to produce electricity and have a rated capacity of 25 kilowatts (kW) or less. To be eligible, a facility must meet all applicable safety, performance,

77

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Solar Water Wind Program Info State New Jersey Program Type Interconnection Provider New Jersey Board of Public Utilities New Jersey's interconnection standards apply statewide to all electric distribution utilities, but not to the small number of municipal utilities and electric cooperatives in the state. The rules, first adopted in 2001, have been revised several times since their inception, most recently in May 2012. The current standards include the following basic provisions:

78

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

Planning and Operation of Smart Grids with Electric VehiclePlanning and Operation of Smart Grids with Electric Vehicleenergy costs at the smart grid or commercial building due to

Stadler, Michael

2012-01-01T23:59:59.000Z

79

Ecosystem Services Decision Tree: A Decision-Support Tool for Consideration of Ecosystem Services in the Electric Power Industry  

Science Conference Proceedings (OSTI)

To support the electric power industry in more structured consideration of ecosystem services, EPRI has developed this Decision Tree to determine why, when, and how to consider ecosystem services. EPRI anticipates that this Decision Tree will facilitate more efficient decision-making and action relating to ecosystem services.

2012-12-31T23:59:59.000Z

80

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

inputs to the site are solar radiation, utility electricity,location-specific solar radiation will impact the adoption

Stadler, Michael

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Production Cost Modeling of Cogenerators in an Interconnected Electric Supply System  

E-Print Network (OSTI)

The Optimal State Electricity Supply System in Texas (OSEST) research project is part of the continuing Public Utility Commission of Texas (PUCT) effort to identify possible improvements in the production, transmission, and use of electricity in the state. The OSEST project is designed to identify the general configuration of the optimal electric supply system resulting from coordinated system planning and operation from a statewide perspective. The Optimized Generation Planning Program (OGP) and Multi-Area Production Simulation Program with Megawatt Flow (MAPS/MWFLOW) are two computer programs developed by General Electric that are being used in the study. Both of these programs perform production costing calculations to evaluate the performance of various electric supply system configurations necessary to appropriately model the present and future cogeneration activity in the service areas of the electric utilities that compose the Electric Reliability Council of Texas (ERCOT).

Ragsdale, K.

1989-09-01T23:59:59.000Z

82

Solar cell array interconnects  

DOE Patents (OSTI)

Electrical interconnects are disclosed for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value. 4 figs.

Carey, P.G.; Thompson, J.B.; Colella, N.J.; Williams, K.A.

1995-11-14T23:59:59.000Z

83

Solar cell array interconnects  

DOE Patents (OSTI)

Electrical interconnects for solar cells or other electronic components using a silver-silicone paste or a lead-tin (Pb-Sn) no-clean fluxless solder cream, whereby the high breakage of thin (<6 mil thick) solar cells using conventional solder interconnect is eliminated. The interconnects of this invention employs copper strips which are secured to the solar cells by a silver-silicone conductive paste which can be used at room temperature, or by a Pb-Sn solder cream which eliminates undesired residue on the active surfaces of the solar cells. Electrical testing using the interconnects of this invention has shown that no degradation of the interconnects developed under high current testing, while providing a very low contact resistance value.

Carey, Paul G. (Mountain View, CA); Thompson, Jesse B. (Brentwood, CA); Colella, Nicolas J. (Livermore, CA); Williams, Kenneth A. (Livermore, CA)

1995-01-01T23:59:59.000Z

84

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

PV and solar thermal technologies. Previous work has shown that the utility electricity prices andprices. Finally, Table 6 shows the area constraint used for PV,

Stadler, Michael

2012-01-01T23:59:59.000Z

85

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

of the arbitrage, the energy tariffs remain unchanged. Inof energy between buildings with different tariffs. However,energy loads, detailed electricity and natural gas tariffs,

Stadler, Michael

2012-01-01T23:59:59.000Z

86

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

or cooling loads via absorption cooling. The outputs of DER-for hot water usage and absorption cooling, thereby allowingutilization and absorption cooling reduces the electricity

Stadler, Michael

2012-01-01T23:59:59.000Z

87

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

88

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State South Dakota Program Type Interconnection Provider S.D. Public Utilities Commission South Dakota's interconnection standards for distributed generation, adopted by the state Public Utilities Commission (PUC) in May 2009, apply to customers of investor-owned utilities.* The rules provide for four levels of interconnection for systems up to 10 megawatts (MW) in capacity:

89

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State North Carolina Program Type Interconnection Provider North Carolina Utilities Commission The North Carolina Utilities Commission (NCUC) adopted comprehensive interconnection standards for distributed generation in June 2008. The NCUC standards, which are similar to the Federal Energy Regulatory Commission's (FERC) interconnection standards for small generators,

90

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Michigan Program Type Interconnection Provider Michigan Public Service Commission The Michigan Public Service Commission (PSC) first adopted interconnection standards for distributed generation (DG) in September 2003. The original standards provided for 5 levels of interconnection with cutoffs at 30 kilowatts (kW), 150 kW, 750 kW, and 2 megawatts (MW), but left many details

91

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

92

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

93

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

94

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

95

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Connecticut Program Type Interconnection Provider Public Utilities Regulatory Authority In December 2007, the Connecticut Department of Public Utility Control (DPUC) now called the Public Utilities Regulatory Authority (PURA) approved new interconnection guidelines for distributed energy systems up to 20 megawatts (MW) in capacity. Connecticut's interconnection guidelines apply to the state's two investor-owned utilities -- Connecticut Light and Power

96

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Arizona Program Type Interconnection Provider Arizona Corporation Commission '''''Note: In June 2007, the Arizona Corporation Commission (ACC) initiated a rulemaking process to establish statewide interconnection standards for distributed generation (DG). This proceeding is still in progress. Until the new official rules go into effect, the commission has recommended that the utilities use the [http://images.edocket.azcc.gov/docketpdf/0000074361.pdf Interconnection

97

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Hawaii Program Type Interconnection Provider Hawaii Public Utilities Commission Hawaii has established simplified interconnection rules for small renewables and separate rules for all other distributed generation (DG). For inverter-based systems up to 10 kilowatts (kW) in capacity (and inverter-based DG under 250 kW on islands other than Kauai), there is a simple application process for interconnection. Systems must use inverters

98

Interconnection Panel  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Panel Dan Tunnicliff, P.E. Manager, Government Segment, Southern California Edison Southern California Edison Application Processing Technical Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Overview of Generation Interconnection Process (GIP) * Transmission Level Interconnections - Governed by CAISO Tariff. * Generally for 220 kV and higher. * All applications must be submitted to the CAISO. * CAISO administers its tariff, which is approved by FERC. * Distribution Level Interconnections - Governed by SCE's WDAT. * Generally below 220 kV. * All applications must be submitted to SCE. * SCE administers its tariff, which is approved by FERC. 2 Southern California Edison Interconnection agreements are critically

99

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Wind Program Info State Missouri Program Type Interconnection Provider Missouri Department of Natural Resources Missouri enacted legislation (S.B. 54) in June 2007 requiring all of the state's electric utilities -- including municipal utilities and electric cooperatives -- to offer net metering to customers with systems up to 100 kilowatts (kW) in capacity that generate electricity using wind energy, solar-thermal energy, hydroelectric energy, photovoltaics (PV), fuel cells

100

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

net-metering law includes basic interconnection requirements for systems up to 25 kilowatts (kW) in capacity that generate electricity using solar, wind, hydropower or biomass...

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Texas Program Type Interconnection Provider Public Utility Commission of Texas The Texas Public Utility Regulatory Act (PURA) of 1999 included a provision that "a customer is entitled to have access to on-site distributed generation". As a result, the Public Utility Commission of Texas (PUCT) adopted interconnection standards in 1999. The rules apply to electrical generating facilities (consisting of one or more on-site distributed-generation units) located at a customer's point of delivery,

102

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Minnesota Program Type Interconnection Provider Minnesota Public Utilities Commission Minnesota's net-metering law, enacted in 1983, applies to all investor-owned utilities, municipal utilities and rural electric cooperatives. Qualifying facilities of less than 1,000 kilowatts (kW) are eligible for net metering. However, uniform interconnection regulations were not implemented when net metering was established.

103

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Home Weatherization Wind Program Info State Florida Program Type Interconnection Provider Florida Public Service Commission In March 2008, the Florida Public Service Commission (PSC) adopted interconnection rules for renewable-energy systems up to two megawatts (MW) in capacity. The PSC rules apply only to the state's investor-owned utilities; the rules do not apply to electric cooperatives or municipal

104

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

105

Smart buildings with electric vehicle interconnection as buffer for local renewables?  

E-Print Network (OSTI)

Energy Technologies Division Building / tariffs electricityOptions, Tariffs, and Building Analyzed Environmental Energyenergy management more effective stationary storage will be charged by PV, mobile only marginally results will depend on the considered region and tariff

Stadler, Michael

2012-01-01T23:59:59.000Z

106

EIS-0183: Revised Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Electrical Interconnection of the Summit/Westward Project The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. DOE/EIS-0183, Bonneville Power Administration, Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project (October

107

Learn More About Interconnections | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development Electricity Policy Coordination and Implementation Transmission Planning Recovery Act Interconnection Transmission Planning Congestion Studies Coordination of...

108

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

109

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Solar Wind Program Info State Iowa Program Type Interconnection Provider Iowa Utilities Board Different rules govern the interconnection of distributed generation facilities in Iowa, depending on whether or not the interconnection is with a utility whose rates are regulated by the Iowa Utilities Board (IUB). Rate regulated utilities include only the state's two investor-owned utilities -- MidAmerican Energy and Interstate Power and Light (IPL) -- and Linn

110

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

111

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

112

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines Interconnection Guidelines Interconnection Guidelines < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Home Weatherization Water Program Info State South Carolina Program Type Interconnection Provider Public Service Commission of South Carolina The South Carolina Public Service Commission (PSC) adopted simplified interconnection guidelines for small distributed generation (DG) in December 2006. These guidelines address renewable-energy systems and other forms of DG up to 20 kilowatts (kW) in capacity for residential systems,

113

The Role of Electricity Pricing Policy in Industrial Siting Decisions  

E-Print Network (OSTI)

One of the many reasons why industries tend to co-locate in a general vicinity is the availability of factors of production. A manufacturer can achieve great savings if his production facility is located near his major raw material supplier. Since many intermediate industrial products are extremely energy intensive, the producer of these products must locate in areas where low cost energy resources are abundant. In many instances, therefore, the existence of these industries will serve as an anchor to other manufacturing industries. Furthermore, industry has great inertia in its locational preferences. It takes a long time to establish a patent of growth or decay. But once it is set in motion it is very difficult to change. Since the pricing policy of electricity plays a significant role in the siting decisions of energy intensive industries, it is therefore imperative for the policy makers to understand the long term impact of their policies. This paper will examine the current pricing policy of the electric utility industry in Texas.

Tam, C. S.

1981-01-01T23:59:59.000Z

114

Interconnect Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

115

EIS-0183: Revised Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration The U.S. Department of Energy announces its decisions to provide a conditional loan guarantee for, and interconnection to the Federal Columbia River Transmission River (FCRTS) of, the 846-megawatt (MW) Shepherds. DOE/EIS-0183, Revised Record of Decision for Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration, (October 2010) More Documents & Publications EIS-0183: DOE Notice of Availability of the Record of Decision EIS-0183: DOE Notice of Availability of the Record of Decision

116

Design and implementation of a decision support system for competitive electricity markets  

Science Conference Proceedings (OSTI)

In this paper we describe software which could be used as a decision support tool for decision makers in competitive electricity markets. The tool is based on the behavior of the competitors in the market, thus many different parameters around them are ... Keywords: Competitive electricity markets, Simulation model, Spot prices

Julia Sancho; Joaqun Snchez-Soriano; Juan Antonio Chazarra; Juan Aparicio

2008-03-01T23:59:59.000Z

117

EIS-0294: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Record of Decision 4: Record of Decision EIS-0294: Record of Decision Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line (June 1999) Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line. The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power

118

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Buying & Making Electricity Water Solar Wind Program Info State Virginia Program Type Interconnection Provider Virginia State Corporation Commission Virginia has two interconnection standards: one for net-metered systems and one for systems that are not net-metered. '''Interconnection for Net-Metered Systems''' Customer-generators that net meter must comply with the interconnection rules within the regulations governing net metering (20 VAC 5-315-40). These rules apply to residential customers generating up to 10 kW* and commercial systems of up to 500 kW (or greater if the utility's net

119

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

120

EIS-0354: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision Record of Decision EIS-0354: Record of Decision Western Area Power Administration Valley Electric Association Interconnection of Ivanpah Energy Center to Mead Substation The Department of the Interior, Bureau of Land Management (BLM), prepared an Environmental Impact Statement (EIS) evaluating the construction, operation and maintenance of the Ivanpah Energy Center (IEC) power plant and ancillary facilities. The project would provide 500 megawatts (MW) of baseload power to the southern Nevada power grid. Record of Decision for Western Area Power Administration Valley Electric Association Interconnection of Ivanpah Energy Center to Mead Substation (DOE/EIS-0354) 68 FR 66410 (November 2003) More Documents & Publications EIS-0354: Final Environmental Impact Statement

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

122

Learn More About Interconnections | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learn More About Learn More About Interconnections Learn More About Interconnections Learn More About Interconnections EASTERN INTERCONNECTION North America is comprised of two major and three minor alternating current (AC) power grids or "interconnections." The Eastern Interconnection reaches from Central Canada Eastward to the Atlantic coast (excluding Québec), South to Florida and West to the foot of the Rockies (excluding most of Texas). All of the electric utilities in the Eastern Interconnection are electrically tied together during normal system conditions and operate at a synchronized frequency operating at an average of 60Hz. Click here for more information. DOE is in the process of issuing awards to two entities in the Eastern Interconnection: one to the Eastern Interconnection Planning

123

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Fuel Vehicles Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Utah Program Type Interconnection Provider Utah Public Service Commission Utah requires the state's only investor-owned utility, Rocky Mountain Power (RMP), and most electric cooperatives* to offer net metering to customers who generate electricity using solar energy, wind energy, hydropower, hydrogen, biomass, landfill gas, geothermal energy, waste gas or waste heat capture and recovery. The bill that established net metering also established some basic rules for interconnection. In April 2010, the Utah Public Service Commission (PSC) adopted final rules for interconnection. The rules described below took effect April 30, 2010.

124

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0183: Record of Decision EIS-0183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of the Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard

125

An agent-based decision support system for wholesale electricity market  

Science Conference Proceedings (OSTI)

Application software has been developed for analyzing and understanding a dynamic price change in the US wholesale power market. Traders can use the software as an effective decision-making tool by modeling and simulating a power market. The software ... Keywords: Agent-based approach, Decision support software, Electricity market, Machine learning

Toshiyuki Sueyoshi; Gopalakrishna R. Tadiparthi

2008-01-01T23:59:59.000Z

126

Hopper Interconnect  

NLE Websites -- All DOE Office Websites (Extended Search)

Interconnect Interconnect Interconnect jaguar xt4 Hopper's "Gemini" network is connected in a 3D torus. Description Hopper's compute nodes are connected via a custom high-bandwidth, low-latency network provided by Cray. The connectivity is in the form of a "mesh" in which each node is connected to other nearby nodes like strands in a fishing net, except that the mesh extends in three dimensions. Each network node handles not only data destined for itself, but also data to be relayed to other nodes. Nodes at the "edges" of the mesh network are connected to nodes at the other edge to form a 3-D torus. The custom chips that route communication over the network are known as "Gemini" and the entire network is often referred to as the "Cray Gemini

127

Interconnection Guidelines (Rhode Island) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) Interconnection Guidelines (Rhode Island) < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Home Weatherization Wind Program Info State Rhode Island Program Type Interconnection Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation (HB 6222) in June 2011 to standardize the application process for the interconnection of customer-sited renewable-energy systems to the state's distribution grid. Rhode Island's interconnection policy is not nearly as comprehensive as

128

interconnect | OpenEI  

Open Energy Info (EERE)

interconnect interconnect Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. Source NREL Date Released April 11th, 2011 (3 years ago) Date Updated April 11th, 2011 (3 years ago) Keywords buildings carbon dioxide emissions carbon footprinting CO2 commercial buildings electricity emission factors ERCOT hourly emission factors interconnect nitrogen oxides NOx

129

Modeling, Optimization and Power Efficiency Comparison of High-speed Inter-chip Electrical and Optical Interconnect Architectures in Nanometer CMOS Technologies  

E-Print Network (OSTI)

Inter-chip input-output (I/O) communication bandwidth demand, which rapidly scaled with integrated circuit scaling, has leveraged equalization techniques to operate reliably on band-limited channels at additional power and area complexity. High-bandwidth inter-chip optical interconnect architectures have the potential to address this increasing I/O bandwidth. Considering future tera-scale systems, power dissipation of the high-speed I/O link becomes a significant concern. This work presents a design flow for the power optimization and comparison of high-speed electrical and optical links at a given data rate and channel type in 90 nm and 45 nm CMOS technologies. The electrical I/O design framework combines statistical link analysis techniques, which are used to determine the link margins at a given bit-error rate (BER), with circuit power estimates based on normalized transistor parameters extracted with a constant current density methodology to predict the power-optimum equalization architecture, circuit style, and transmit swing at a given data rate and process node for three different channels. The transmitter output swing is scaled to operate the link at optimal power efficiency. Under consideration for optical links are a near-term architecture consisting of discrete vertical-cavity surface-emitting lasers (VCSEL) with p-i-n photodetectors (PD) and three long-term integrated photonic architectures that use waveguide metal-semiconductor-metal (MSM) photodetectors and either electro-absorption modulator (EAM), ring resonator modulator (RRM), or Mach-Zehnder modulator (MZM) sources. The normalized transistor parameters are applied to jointly optimize the transmitter and receiver circuitry to minimize total optical link power dissipation for a specified data rate and process technology at a given BER. Analysis results shows that low loss channel characteristics and minimal circuit complexity, together with scaling of transmitter output swing, allows electrical links to achieve excellent power efficiency at high data rates. While the high-loss channel is primarily limited by severe frequency dependent losses to 12 Gb/s, the critical timing path of the first tap of the decision feedback equalizer (DFE) limits the operation of low-loss channels above 20 Gb/s. Among the optical links, the VCSEL-based link is limited by its bandwidth and maximum power levels to a data rate of 24 Gb/s whereas EAM and RRM are both attractive integrated photonic technologies capable of scaling data rates past 30 Gb/s achieving excellent power efficiency in the 45 nm node and are primarily limited by coupling and device insertion losses. While MZM offers robust operation due to its wide optical bandwidth, significant improvements in power efficiency must be achieved to become applicable for high density applications.

Palaniappan, Arun

2010-12-01T23:59:59.000Z

130

SOFC INTERCONNECT DEVELOPMENT  

DOE Green Energy (OSTI)

An interconnect for an SOFC stack is used to connect fuel cells into a stack. SOFC stacks are expected to run for 40,000 hours and 10 thermal cycles for the stationary application and 10,000 hours and 7000 thermal cycles for the transportation application. The interconnect of a stack must be economical and robust enough to survive the SOFC stack operation temperature of 750 C and must maintain the electrical connection to the fuel cells throughout the lifetime and under thermal cycling conditions. Ferritic and austenitic stainless steels, and nickel-based superalloys were investigated as possible interconnect materials for solid oxide fuel cell (SOFC) stacks. The alloys were thermally cycled in air and in a wet nitrogen-argon-hydrogen (N2-Ar-H2-H2O) atmosphere. Thermogravimetry was used to determine the parabolic oxidation rate constants of the alloys in both atmospheres. The area-specific resistance of the oxide scale and metal substrates were measured using a two-probe technique with platinum contacts. The study identifies two new interconnect designs which can be used with both bonded and compressive stack sealing mechanisms. The new interconnect designs offer a solution to chromium vaporization, which can lead to degradation of some (chromium-sensitive) SOFC cathodes.

Diane M. England

2004-03-16T23:59:59.000Z

131

Eastern Interconnection Planning Collaborative News Release | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

132

Definition: Interconnected Operations Service | Open Energy Informatio...  

Open Energy Info (EERE)

operation of interconnected Bulk Electric Systems.1 Also Known As IOS Related Terms transmission lines, energy, transmission line, transmission service References ...

133

PJM Interconnection (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) PJM Interconnection (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Interconnection PJM (originally Pennsylvania, Jersey, Maryland) Interconnection is a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. The PJM region has an area of 214,000 square miles, a population of about 60 million and a peak demand of 163,848 megawatts

134

Integrated Decision Algorithms for Auto-steered Electric Transmission System Asset Management  

Science Conference Proceedings (OSTI)

Electric power transmission systems are comprised of a large number of physical assets, including transmission lines, power transformers, and circuit breakers, that are capital-intensive, highly distributed, and may fail. Managing these assets under ... Keywords: Benders decomposition, asset management, condition monitoring, decision algorithms, electric transmission, optimization, service-oriented architecture, software-hardware

James Mccalley; Vasant Honavar; Sarah Ryan; William Meeker; Daji Qiao; Ron Roberts; Yuan Li; Jyotishman Pathak; Mujing Ye; Yili Hong

2007-05-01T23:59:59.000Z

135

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

136

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New Mexico Program Type Interconnection Provider New Mexico Public Regulation Commission Interconnection in New Mexico is governed by New Mexico Public Regulation Commission (PRC) Rule 568 and Rule 569. These rules, adopted in July 2008, revised and clarified the state's existing rules. Rule 569 applies to all qualifying facilities (QFs) under PURPA, which generally includes all renewable-energy systems and combined-heat-and-power (CHP) systems up to 80

137

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Ohio Program Type Interconnection Provider Ohio Public Utilities Commission '''''Note: In July 2012, the Public Utilities Commission of Ohio (PUCO) opened a docket ([http://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=12-2051&x=0&y=0 Case 12-0251-EL-ORD]) to review the net metering and interconnection rules for investor-owned utilities. Details will be posted as more information is available.'''''

138

interconnect region | OpenEI  

Open Energy Info (EERE)

interconnect region interconnect region Dataset Summary Description Datasets are for the US electricity grid system interconnect regions (ASCC, FRCC, HICC, MRO, NPCC, RFC, SERC, SPP, TRE, WECC) for 2008. The data is provided in life cycle inventory (LCI) forms (both xls and xml). A module report and a detailed spreadsheet are also included. Source US Life Cycle Inventory Database Date Released May 01st, 2011 (3 years ago) Date Updated Unknown Keywords ASCC FRCC HICC interconnect region LCI life cycle inventory MRO NPCC RFC SERC SPP TRE unit process US utilities WECC Data application/zip icon interconnect_lci_datasets_2008.zip (zip, 6.3 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

139

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

140

Intelligent decision-making system with green pervasive computing for renewable energy business in electricity markets on smart grid  

Science Conference Proceedings (OSTI)

This paper is about the intelligent decision-making system for the smart grid based electricity market which requires distributed decision making on the competitive environments composed of many players and components. It is very important to consider ...

Dong-Joo Kang; Jong Hyuk Park; Sang-Soo Yeo

2009-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

142

EIS-0183: Notice of Availability of the Record of Decision | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision Record of Decision EIS-0183: Notice of Availability of the Record of Decision Electrical Interconnection of the Lower Snake River Wind Energy Project, Garfield and Columbia Counties, Washington The Bonneville Power Administration (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for interconnection of up to 1250 megawatts of power into the Federal Columbia River Transmission System. The power would be generated from their proposed Lower Snake River Wind Energy Project (Wind Project) in Garfield and Columbia counties, Washington. DOE/EIS-0183, Notice of Availability of Record of Decision (ROD) for Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project, Garfield and Columbia Counties,

143

EIS-0183: Notice of Availability of the Record of Decision | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0183: Notice of Availability of the Record of Decision EIS-0183: Notice of Availability of the Record of Decision EIS-0183: Notice of Availability of the Record of Decision Electrical Interconnection of the Lower Snake River Wind Energy Project, Garfield and Columbia Counties, Washington The Bonneville Power Administration (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for interconnection of up to 1250 megawatts of power into the Federal Columbia River Transmission System. The power would be generated from their proposed Lower Snake River Wind Energy Project (Wind Project) in Garfield and Columbia counties, Washington. DOE/EIS-0183, Notice of Availability of Record of Decision (ROD) for Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project, Garfield and Columbia Counties,

144

Interconnection Agreements for Onsite Generation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

145

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Industrial Residential Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Louisiana Program Type Interconnection Provider Louisiana Public Service Commission '''''Note: Ongoing proceedings related to net metering can be found in [http://lpscstar.louisiana.gov/star/portal/lpsc/page/Dockets/portal.aspx Docket R-31417.]''''' The Louisiana Public Service Commission (PSC) adopted rules for net metering and interconnection in November 2005. Louisiana's rules, based on those in place in Arkansas, require publicly-owned utilities and rural electric cooperatives to offer net metering to customers with systems that generate electricity using solar, wind, hydropower, geothermal or biomass

146

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Interconnection of the Windy Point Wind Energy Project Electrical Interconnection of the Windy Point Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS.1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the

147

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

148

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

149

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Public/Consumer General Public/Consumer Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Wind Solar Program Info State Arkansas Program Type Interconnection Provider Arkansas Public Service Commission In April 2001, Arkansas enacted legislation directing the Arkansas Public Service Commission (PSC) to establish net-metering rules for certain renewable-energy systems. The Arkansas Public Service Commission (PSC) adopted net-metering rules in July 2002 (Order No. 02-046-R). Section 3 applies to the interconnection of net-metered facilities to existing electric power systems.* Systems that generate electricity using solar, wind, hydro, geothermal and biomass resources are eligible to interconnect

150

Understanding the Impact of Climate Policy on Electric Company Compliance and Investment Decisions  

Science Conference Proceedings (OSTI)

This report presents interim results of a multiyear effort to better understand how climate policy could impact electric power sector investment and operating decisions. The research reported here focuses on extending prior analyses to determine the effects of CO2 emission constraints on individual generators and to provide guidance on how they can develop appropriate compliance strategies.

2008-12-19T23:59:59.000Z

151

Wind-Energy based Path Planning For Electric Unmanned Aerial Vehicles Using Markov Decision Processes  

E-Print Network (OSTI)

Wind-Energy based Path Planning For Electric Unmanned Aerial Vehicles Using Markov Decision wind-energy is one possible way to ex- tend flight duration for Unmanned Arial Vehicles. Wind-energy sources of wind energy available to exploit for this problem [5]: 1) Vertical air motion, such as thermal

Smith, Ryan N.

152

Advanced Interconnect Development  

DOE Green Energy (OSTI)

The objectives of this project are to develop cost-effective, optimized materials for intermediate temperature SOFC interconnect and interconnect/electrode interface applications and identify and understand degradation processes in interconnects and at their interfaces with electrodes.

Yang, Z.G.; Maupin, G.; Simner, S.; Singh, P.; Stevenson, J.; Xia, G.

2005-01-27T23:59:59.000Z

153

Program on Technology Innovation: Decision-Centered Guidelines for the Design of Human System Interfaces for Electric Power Industry Applications  

Science Conference Proceedings (OSTI)

Decision-centered guidelines support improved user decision making across a broad range of electric power industry application areas. The guidelines will aid in the design of user-centered human-system interfaces (HSIs), while increasing the beneficial uses of new technologies for electric power generation, transmission, and distribution (GTD) systems. Decision-centered guidelines are applicable to system designs involving new technology that will transform current user tasks, responsibilities, ...

2012-09-24T23:59:59.000Z

154

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

155

High temperature solid electrolyte fuel cell configurations and interconnections  

DOE Patents (OSTI)

High temperature fuel cell configurations and interconnections are made including annular cells having a solid electrolyte sandwiched between thin film electrodes. The cells are electrically interconnected along an elongated axial outer surface.

Isenberg, Arnold O. (Forest Hills, PA)

1984-01-01T23:59:59.000Z

156

Superconductive interconnections for cryoelectronics  

Science Conference Proceedings (OSTI)

Factors affecting the use of superconducting interconnections for cryoelectronics will be examined. The fundamental questions to be answered are why interconnections are important for high performance computing

Kenneth Rose

1992-01-01T23:59:59.000Z

157

Electricity Advisory Committee Meeting Presentations October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 - Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes...

158

Electricity Advisory Committee Meeting Presentations October...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel...

159

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bioenergy Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Kansas Program Type Interconnection Provider Kansas Corporation Commission Kansas adopted the Net Metering and Easy Connection Act in May 2009 (see K.S.A. 66-1263 through 66-1271), establishing interconnection guidelines and net metering for customer-owned generators. Net metering and the accompanying interconnection guidelines apply to systems that generate electricity using solar, wind, methane, biomass or hydro resources, and to fuel cells using hydrogen produced by an eligible renewable technology, with a rated capacity of 25 kilowatts (kW) or less for residential customers, 200 kW or less for non-residential customers and 1.5 megawatts

160

Grid-Connected Inverter Anti-Islanding Test Results for General Electric Inverter-Based Interconnection Technology  

SciTech Connect

This report covers testing of General Electric-proposed anti-islanding schemes. The objectives were to: (1) Validate the effectiveness of the proposed anti-islanding schemes; (2) Conduct parametric evaluation of the schemes with respect to control settings and load conditions, including controller gains, load power levels, and load quality factors; and (3) Examine the ability of the distributed resource to ride through a low-voltage condition on the utility grid.

Ye, Z.; Dame, M.; Kroposki, B.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

GSA-Utility Interconnection Agreements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

162

EIS-0435: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision 5: Record of Decision EIS-0435: Record of Decision Record of Decision for the Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota (December 2011) For more information, contact: Ms. Erika Walters NEPA Document Manager Groton EIS Western Area Power Administration A7400, P.O. Box 281213, Lakewood, CO 80228 Telephone: 720-962-7279 Fax: 720-962-7269 Electronic mail: Groton@wapa.gov In 2009, Western Area Power Administration (Western) received a request from Basin Electric Power Cooperative (Basin Electric) to modify its Large Generator Interconnection Agreement (LGIA) with Basin Electric for the Groton Generation Station to eliminate current operating limits on the generating station. The LGIA currently limits the output of the Groton

163

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Interconnection of TransAlta Centralia Generation LLC Big Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (October 2001) More Documents & Publications EIS-0230: Record of Decision

164

Pulsed wave interconnect  

Science Conference Proceedings (OSTI)

Pulsed wave interconnect is proposed for global interconnect applications. Signals are represented by localized wavepackets that propagate along the interconnect lines at the local speed of light to trigger the receivers. Energy consumption is reduced ... Keywords: CMOS, VLSI, high-speed interconnect, nonlinear transmission line, pulse compression, soliton, wafer-scale-integration

Pingshan Wang; Gen Pei; Edwin Chih-Chuan Kan

2004-05-01T23:59:59.000Z

165

Puerto Rico - Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards Puerto Rico - Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Autoridad de Energía Electrica de Puerto Rico In 2007, the Autoridad de Energía Electrica de Puerto Rico (PREPA*) adopted interconnection standards based on the standard contained in the federal Energy Policy Act of 2005. PREPA promulgated interconnection rules in August 2008 that apply to all distributed generation (DG) projects that

166

Carbon Nanomaterials: The Ideal Interconnect Technology for Next-Generation ICs  

Science Conference Proceedings (OSTI)

Editor's note:Carbon nanotubes and graphene nanoribbons are two promising next-generation interconnect technologies. Electrical modeling and performance analysis have demonstrated the superiority of these emerging technologies compared to conventional ... Keywords: design and test, carbon nanomaterials, carbon nanotube (CNT), graphene nanoribbon (GNR), electrical interconnects, optical interconnects, RF or wireless interconnects, on-chip vias, through-silicon vias (TSVs), delay, power

Hong Li; Chuan Xu; Kaustav Banerjee

2010-07-01T23:59:59.000Z

167

Durability of Metallic Interconnects and Protective Coatings  

SciTech Connect

To build up a useful voltage, a number of solid oxide fuel cells (SOFCs) are electrically connected into series in a stack via interconnects, which are placed between adjacent cells. In addition to functioning as a bi-polar electrical connector, the interconnect also acts as a separator plate that separates the fuel at the anode side of one cell from the air at the cathode side on an adjacent cell. During SOFC operation at the high temperatures, the interconnects are thus simultaneously exposed to the oxidizing air at one side and a reducing fuel that can be either hydrogen or hydrocarbon at the other. Besides, they are in contact with adjacent components, such as electrodes or electrical contacts, seals, etc. With steady reduction in SOFC operating temperatures into the low or intermediate range 600-850oC, oxidation resistant alloys are often used to construct interconnects. However, the metallic interconnects may degrade via interactions at their interfaces with surrounding environments or adjacent components, potentially affecting the stability and performance of interconnects and the SOFC stacks. Thus protection layers are applied to metallic interconnects that also intend to mitigate or prevent chromium migration into cells and the cell poisoning. This chapter provides a comprehensive review of materials for metallic interconnects, their degradation and coating protection.

Yang, Zhenguo; Stevenson, Jeffry W.

2009-12-15T23:59:59.000Z

168

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Industrial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Home Weatherization Wind Program Info State West Virginia Program Type Interconnection Provider West Virginia Public Service Commission In 2006, West Virginia stakeholders came together to consider net metering, interconnection as required by the Federal Energy Policy Act (2005) and agreed upon a "Statement of Consensus Among Parties," which was presented to and accepted by the West Virginia Public Service Commission (PSC) in December 2006. The consensus agreement did include interconnection guidelines for the state, however, the PSC did not initiate a formal rule-making or incorporate the guidelines into agency rules. Rather, the

169

Electroplating of Cu(Ag) thin films for interconnect applications  

Science Conference Proceedings (OSTI)

Electromigration effects in interconnect metallizations cause a need for materials with superior resistance against electromigration failure but with adequate electrical properties. In principle, Cu(Ag) alloys are potential candidates to become an interconnect ... Keywords: Copper-silver alloy thin film, Electrochemical deposition, Interconnect material

S. Strehle; S. Menzel; J. W. Bartha; K. Wetzig

2010-02-01T23:59:59.000Z

170

Photonic crystal cavity based architecture for optical interconnects.  

E-Print Network (OSTI)

??Todays information and communication industry is confronted with a serious bottleneck due to the prohibitive energy consumption and limited transmission bandwidth of electrical interconnects. Silicon (more)

Debnath, Kapil

2013-01-01T23:59:59.000Z

171

Updating Technical Screens for PV Interconnection: Preprint  

DOE Green Energy (OSTI)

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlined as possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG. However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnection process. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

Coddington, M.; Ellis, A.; Lynn, K.; Razon, A.; Key, T.; Kroposki, B.; Mather, B.; Hill, R.; Nicole, K.; Smith, J.

2012-08-01T23:59:59.000Z

172

Risk perception & strategic decision making :general insights, a framework, and specific application to electricity generation using nuclear energy.  

SciTech Connect

The objective of this report is to promote increased understanding of decision making processes and hopefully to enable improved decision making regarding high-consequence, highly sophisticated technological systems. This report brings together insights regarding risk perception and decision making across domains ranging from nuclear power technology safety, cognitive psychology, economics, science education, public policy, and neural science (to name a few). It forms them into a unique, coherent, concise framework, and list of strategies to aid in decision making. It is suggested that all decision makers, whether ordinary citizens, academics, or political leaders, ought to cultivate their abilities to separate the wheat from the chaff in these types of decision making instances. The wheat includes proper data sources and helpful human decision making heuristics; these should be sought. The chaff includes ''unhelpful biases'' that hinder proper interpretation of available data and lead people unwittingly toward inappropriate decision making ''strategies''; obviously, these should be avoided. It is further proposed that successfully accomplishing the wheat vs. chaff separation is very difficult, yet tenable. This report hopes to expose and facilitate navigation away from decision-making traps which often ensnare the unwary. Furthermore, it is emphasized that one's personal decision making biases can be examined, and tools can be provided allowing better means to generate, evaluate, and select among decision options. Many examples in this report are tailored to the energy domain (esp. nuclear power for electricity generation). The decision making framework and approach presented here are applicable to any high-consequence, highly sophisticated technological system.

Brewer, Jeffrey D.

2005-11-01T23:59:59.000Z

173

Eastern Interconnection Planning Collaborative News Release | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

174

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

183: Record of Decision 183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (October 2001)

175

Electricity transmission congestion costs: A review of recent reports  

E-Print Network (OSTI)

Market Report: New York Electricity Markets. April. PJM (PJM Interconnection, LLC).2002. PJM Interconnection State of the Market Report 2001.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-01-01T23:59:59.000Z

176

EIS-0230: DOE Notice of Availability of the Record of Decision | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: DOE Notice of Availability of the Record of Decision 0: DOE Notice of Availability of the Record of Decision EIS-0230: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Satsop Combustion Turbine Project This notice announces the availability of the ROD to offer contract terms to integrate power from the Satsop Combustion Turbine Project, a 650-megawatt gas-fired, combined-cycle, combustion turbine power generation project, into the Federal Columbia River Transmission System (FCRTS). DOE/EIS-0230, Notice of Availability of the Record of Decision for the Electrical Interconnection of the Satsop Combustion Turbine Project, 67 FR 30905 (May 2002) More Documents & Publications EIS-0230: Record of Decision EIS-0183: Record of Decision EIS-0230: Final Environmental Statement

177

Interconnection Guidelines | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Wind Program Info State Georgia Program Type Interconnection Provider Georgia Public Service Commission The Georgia Cogeneration and Distributed Generation Act of 2001 allows residential electricity customers with photovoltaic (PV) systems, wind-energy systems or fuel cells up to 10 kilowatts (kW) in capacity, and commercial facilities up to 100 kW, to connect to the grid. The aggregate capacity of distributed generation systems is limited to 0.2% of a utility's system peak demand from the previous year. Interconnected customers must comply with all relevant national standards,

178

Compact Models for Transient Analysis of Single-Layer Graphene Nanoribbon Interconnects  

Science Conference Proceedings (OSTI)

Carbon based interconnects have shown immense potential as a candidate to replace traditional copper interconnects for on-chip applications. In that, 2D Graphene Nanoribbon (GNR) interconnects offer superior electrical properties owing to larger mean ... Keywords: GNR, time-domain analysis, delay, energy, interconnects, 3 dB frequency, EDP (energy delay product)

Prashant Kumar, Arun Singh, Anshul Garg, Rohit Sharma

2013-04-01T23:59:59.000Z

179

Double interconnection fuel cell array  

DOE Patents (OSTI)

A fuel cell array (10) is made, containing number of tubular, elongated fuel cells (12) which are placed next to each other in rows (A, B, C, D), where each cell contains inner electrodes (14) and outer electrodes (18 and 18'), with solid electrolyte (16 and 16') between the electrodes, where the electrolyte and outer electrode are discontinuous, having two portions, and providing at least two opposed discontinuities which contain at least two oppositely opposed interconnections (20 and 20') contacting the inner electrode (14), each cell (12) having only three metallic felt electrical connectors (22) which contact surrounding cells, where each row is electrically connected to the other.

Draper, Robert (Churchill Boro, PA); Zymboly, Gregory E. (Murrysville, PA)

1993-01-01T23:59:59.000Z

180

Interconnection Standards for Small Generators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards for Small Generators Interconnection Standards for Small Generators Interconnection Standards for Small Generators < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Water Wind Energy Sources Solar Home Weatherization Program Info Program Type Interconnection Provider Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) adopted "small generator" interconnection standards for distributed energy resources up to 20 megawatts (MW) in capacity in May 2005.* The FERC's standards apply only to facilities subject to the jurisdiction of the commission; these facilities

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Electricity Advisory Committee Meeting Presentations October 2011 -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Processes Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel Discussion on Interconnection-Wide Transmission Planning Processes Interconnection-Wide Planning in the Eastern Interconnection - David Whiteley, Eastern Interconnection Planning Collaborative WECC Regional Transmission Expansion Planning (RTEP)10 year plan - Brad Nickell, Western Electricity Coordinating Council Transmission Planning in the ERCOT Interconnection 2011 - Warren Lasher, Electric Reliability Council of Texas EAC Presentation - Interconnection-Wide Planning in the Eastern Interconnection 2011 - Whiteley.pdf EAC Presentation - WECC Regional Transmission Expansion Planning (RTEP)10

182

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Interconnection of the Willow Creek Wind Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 72 megawatts...

183

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

184

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

185

Recovery Act Interconnection Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

186

Optimal Planning and Operation of Smart Grids with Electric Vehicle...  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection Title Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection...

187

EIS-0297: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Record of Decision EIS-0297: Record of Decision Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific...

188

Interconnection Testing of Distributed Resources: Preprint  

DOE Green Energy (OSTI)

With the publication of IEEE 1547-2003(TM) Standard for Interconnecting Distributed Resources With Electric Power Systems, the electric power industry has a need to develop tests and procedures to verify that interconnection equipment meets 1547 technical requirements. A new standard, IEEE P1547.1(TM), is being written to give detailed tests and procedures for confirming that equipment meets the interconnection requirements. The National Renewable Energy Laboratory has been validating test procedures being developed as part of IEEE P1547.1. As work progresses on the validation of those procedures, information and test reports are passed on to the working group of IEEE P1547.1 for future revisions.

Kroposki, B.; Basso, T.; DeBlasio, R.

2004-02-01T23:59:59.000Z

189

Recovery Act Interconnection Transmission Planning | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

policy and regulatory decisions in the years to come and provide critical information to electricity industry planners, states and others to develop a modernized, low-carbon...

190

Interconnection Standards (Utah  

Open Energy Info (EERE)

procedures are divided into three levels: * '''Level 1 Interconnection''' applies to inverter-based systems with a maximum capacity of 25 kilowatts (kW). These systems must comply...

191

Control Performance Standards and Procedures for Interconnected Operation  

Science Conference Proceedings (OSTI)

This report documents joint efforts of the North American Electric Reliability Council (NERC) and EPRI to develop new control area performance standards for operation of the North American Interconnections. These criteria will optimize operational efficiency of the Interconnections without impacting power system security.

1997-06-10T23:59:59.000Z

192

Naturalistic Decision Making for Power System Operators  

Science Conference Proceedings (OSTI)

Motivation Investigations of large-scale outages in the North American interconnected electric system often attribute the causes to three Ts: Trees, Training and Tools. To document and understand the mental processes used by expert operators when making critical decisions, a naturalistic decision making (NDM) model was developed. Transcripts of conversations were analyzed to reveal and assess NDM-based performance criteria. Findings/Design An item analysis indicated that the operators Situation Awareness Levels, mental models, and mental simulations can be mapped at different points in the training scenario. This may identify improved training methods or analytical/ visualization tools. Originality/Value This study applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message The NDM approach provides a viable framework for systematic training management to accelerate learning in simulator-based training scenarios for power system operators and teams.

Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

2010-02-01T23:59:59.000Z

193

Electrical and optical performance characteristics of 0.74eV p/n InGaAs monolithic interconnected modules  

DOE Green Energy (OSTI)

There has been a traditional trade-off in thermophotovoltaic (TPV) energy conversion development between system efficiency and power density. This trade-off originates from the use of front surface spectral controls such as selective emitters and various types of filters. A monolithic interconnected module (MIM) structure has been developed which allows for both high power densities and high system efficiencies. The MIM device consists of many individual indium gallium arsenide (InGaAs) cells series-connected on a single semi-insulating indium phosphide (InP) substrate. The MIM is exposed to the entire emitter output, thereby maximizing output power density. An infrared (IR) reflector placed on the rear surface of the substrate returns the unused portion of the emitter output spectrum back to the emitter for recycling, thereby providing for high system efficiencies. Initial MIM development has focused on a 1 cm{sup 2} device consisting of eight series interconnected cells. MIM devices, produced from 0.74 eV InGaAs, have demonstrated V{sub oc} = 3.2 volts, J{sub sc} = 70 mA/cm{sup 2} and a fill factor of 66% under flashlamp testing. Infrared (IR) reflectance measurements (> 2 {micro}m) of these devices indicate a reflectivity of > 82%. MIM devices produced from 0.55 eV InGaAs have also been demonstrated. In addition, conventional p/n InGaAs devices with record efficiencies (11.7% AM0) have been demonstrated.

Wilt, D.M.; Weizer, V.G. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Fatemi, N.S.; Jenkins, P.P.; Hoffman, R.W. Jr. [Essential Research Inc., Cleveland, OH (United States); Jain, R.K. [National Research Council, Washington, DC (United States); Murray, C.S.; Riley, D.R. [Westinghouse Electric Corp., West Mifflin, PA (United States)

1997-06-01T23:59:59.000Z

194

A reinforcement learning approach to autonomous decision-making in smart electricity markets  

Science Conference Proceedings (OSTI)

The vision of a Smart Electric Grid relies critically on substantial advances in intelligent decentralized control mechanisms. We propose a novel class of autonomous broker agents for retail electricity trading that can operate in a wide range of Smart ... Keywords: Energy brokers, Feature selection, Reinforcement learning, Smart electricity grid, Trading agents

Markus Peters; Wolfgang Ketter; Maytal Saar-Tsechansky; John Collins

2013-07-01T23:59:59.000Z

195

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Goodnoe Hills and White Creek Wind Energy Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 350 megawatts (MW) of power to be generated by the proposed Goodnoe Hills (150 MW) and White Creek (200 MW) Wind Energy Projects (Wind Projects) into the Federal Columbia River Transmission System (FCRTS). The Wind Projects will be interconnected at the proposed BPA Rock Creek substation. This substation will be constructed as a 500/230-kilovolt (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. These proposed facilities will be located in Klickitat County, Washington. DOE/EIS-0183, Record of Decision for the Electrical Interconnection of the Goodnoe Hills and White Creek Wind Energy Projects (October 2005)

196

Decision on the Pacific Gas and Electric Company's application for certification for Geysers Unit 17  

DOE Green Energy (OSTI)

The decision in favor of Geysers Unit 17 is presented. Included in the decisions are the findings, conclusions, and conditions on the following: need, socioeconomics, cultural resources, noise, hydrology and water resources, water quality, soils, biological resources, civil engineering, safety, transmission lines, geotechnical considerations, air quality, public health, and structural engineering and reliability. Provisions for monitoring compliance with applicable laws, regulations, and conditions are incorporated. (MHR)

Not Available

1979-09-01T23:59:59.000Z

197

WECC releases its first-ever transmission plan for the Western Interconnection  

Energy.gov (U.S. Department of Energy (DOE))

The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

198

Record of Decision and Floodplain Statement of Findings; Bangor Hydro-Electric Company Northeast Reliability Interconnect (DOE/EIS-0372) (01/05/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Federal Register 7 Federal Register / Vol. 71, No. 3 / Thursday, January 5, 2006 / Notices individual submitting the comment. Unless the individual submits the comment anonymously, a name search will result in the comment being displayed for view. If the comment is submitted electronically using the FDMS system, the viewed comment will not include the name of the submitter or any other identifying information about the individual except that which the submitter has opted to include as part of his or her general comments. However, a comment submitted in writing that has been scanned and uploaded into the FDMS system will display the submitter's identifying information that has been included as part of the written correspondence. RECORD ACCESS PROCEDURES: Individuals seeking access to records

199

Notice of Availability of the Record of Decision for the Electrical Interconnection of the Satsop Combustion Turbine Project (5/8/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Federal Register / Vol. 67, No. 89 / Wednesday, May 8, 2002 / Notices [FR Doc. 02-11308 Filed 5-7-02; 8:45 am] BILLING CODE 4000-01-C DEPARTMENT OF ENERGY [Solicitation Number DE-PS36-02GO92004] Hydrogen Research and Development AGENCY: Golden Field Office, DOE. ACTION: Issuance of Solicitation for Financial Assistance Applications. SUMMARY: The U.S. Department of Energy (DOE) is announcing its intention to seek Financial Assistance Applications for research and development (R&D) projects involving technologies for the production, storage, and utilization of hydrogen. DATES: Issuance of the Solicitation is planned for no later than early May, 2002. ADDRESSES: To obtain a copy of the Solicitation once it is issued, interested parties should access the DOE Golden Field Office home page at http://

200

Pepco and PJM Interconnection Comments on District of Columbia Public  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pepco and PJM Interconnection Comments on District of Columbia Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Docket No. EO-05-01: In accordance with Order No. 202-06-1, issued by the Department of Energy on February 17, 2006. Potomac Electric Power Company and PJM Interconnection, L.L.C. jointly submit these comments and answer to the requests for rehearing submitted by the City of Alexandria, Virginia and the Director of the Virginia Department of Environmental Quality in the captioned proceeding . Pepco and PJM Interconnection Comments on District of Columbia Public

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Eastern Interconnection Planning Collaborative News Release  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

202

Multi-level decision-based system architecting  

E-Print Network (OSTI)

Decision-based system architecting represents a complex system as a set of interconnected decisions that a .system architect can make about the trade space. Modeling a system using decision-based frameworks allows the ...

Guest, Arthur N. (Arthur Norman)

2011-01-01T23:59:59.000Z

203

EIS-0183: Notice of Availability of the Revised Record of Decision |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Record of Decision Revised Record of Decision EIS-0183: Notice of Availability of the Revised Record of Decision Bonneville Power Administration, Summit/Westward Project This notice announces the availability of the Revised ROD to offer contract terms for an optional electrical interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at a point near the existing Wauna Substation of the Clatskanie People's Utility District (CPUD), Columbia County, Oregon. EIS-0183; Notice of Availability of the Revised Record of Decision for the Bonneville Power Administration, Summit/Westward Project (October 2004) More Documents & Publications EIS-0183: Revised Record of Decision EIS-0183: Record of Decision EIS-0349: DOE Notice of Availability of the Record of Decision

204

Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Initial Comments of PJM Interconnection, and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. On January 5, 2009, ITC Transmission filed with the Department of Energy a request to amend Presidential Permit PP-230-3, which authorizes ITC to own and operate specified electric transmission facilities at the Bunce Creek station that interconnect ITC with Hydro One Networks Inc electric transmission facilities at the Michigan-Ontario border. Motion to Intervene and Initial Comments of PJM Interconnection, L.L.C. More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of

205

National electrical code changes for 1996 and USA participation in International Energy Agency activities related to photovoltaics safety and grid interconnection  

DOE Green Energy (OSTI)

As photovoltaic (PV) systems gain more acceptance in utility-interactive applications throughout the world, many organizations are placing increasingly higher priorities on writing guidelines, codes and standards. These guidelines and codes are being written to improve safety, installation, acceptance, listing or certification of the PV components or systems. Sandia National Laboratories` PV System Applications Department is working closely with the PV industry to address issues that are associated with fire and personnel safety and with National Electrical Code (NEC) requirements. Additionally, the United States has agreed to participate in two of the International Energy Agency (IEA) Annexes (topical tasks) of the Implementing Agreement for a Cooperative Programme on Photovoltaic Power Systems. This paper describes events and activities associated with the NEC and the IEA that are being led by Sandia National Laboratories with broad participation by the US PV industry.

Bower, W.

1995-01-01T23:59:59.000Z

206

Utility Wind Integration Group Distributed Wind/Solar Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Wind Integration Group Distributed Wind/Solar Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop Utility Wind Integration Group Distributed Wind/Solar Interconnection Workshop May 21, 2013 8:00AM MDT to May 22, 2013 5:00PM MDT Golden, Colorado This two-day workshop will answer your questions about interconnecting wind and solar plants and other distributed generation applications to electric distribution systems while providing insight on integrating large-scale renewable generation into the transmission system. Held at the National Renewable Energy Laboratory's (NREL) state-of-the-art Energy Systems Integration Facility (ESIF) on the first day and at the Western Area Power Administration's Electric Power Training Center (EPTC) on the second day, the workshop will provide an overview of wind and solar interconnection

207

Pre-Certification Testing of Vendor Interconnection Products  

Science Conference Proceedings (OSTI)

A recent EPRI-sponsored project surveyed the state of interconnection hardware and practices used in the connection of distributed generation and storage to the electric power system. The assessment reviewed the adequacy of these products and practices to meet expected future distributed generation (DR) applications and identified gaps in knowledge. The project also tested the performance of several available interconnection products used for protective relaying and paralleling functions. This report giv...

2002-11-22T23:59:59.000Z

208

Solar cell interconnection and packaging using tape carrier  

SciTech Connect

This paper describes an array of photovoltaic cells. It comprises: photovolatic cells having a ratio of mass to surface area of less than 60 milligrams/square centimeter; a dielectric tape having a carrier surface for supporting the photovoltaic cells; interconnect means including an electrical circuit for electrically interconnecting the photovoltaic cells, the interconnect means supported by the dielectric tape on the carrier surface, the electrical circuit including contact fingers; and means defining primary openings in the dielectric tape, a primary opening being associated with a contact finger and positioned such that the contact finger can be directed from below the carrier surface in the direction of the photovoltaic cells and electrically connected to a photovoltaic cell, a portion of both sides of the contact finger being substantially free of the dielectric tape. This patent also describes the array of the above claim, wherein the photovoltaic cells are tandem cells including an upper subcell and a lower subcell.

Kim, N.P.; Stanbery, B.J.

1991-06-04T23:59:59.000Z

209

Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms  

Science Conference Proceedings (OSTI)

Wind is the worlds fastest growing electric energy source. Because it is intermittent, though, wind is not used to supply baseload electric power today. Interconnecting wind farms through the transmission grid is a simple and effective way of ...

Cristina L. Archer; Mark Z. Jacobson

2007-11-01T23:59:59.000Z

210

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(S.B. 680) requiring the Illinois Commerce Commission (ICC) to establish standards for net metering and interconnection for renewable energy systems by April 1, 2008....

211

Electric Power Annual  

U.S. Energy Information Administration (EIA) Indexed Site

for Load by North American Electric Reliability Corporation Assessment Area, 2011 Actual, 2012-2016 Projected Net Energy (Thousands of Megawatthours) Eastern Interconnection ERCOT...

212

EIS-0183: Notice of Availability of the Revised Record of Decision |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

183: Notice of Availability of the Revised Record of Decision 183: Notice of Availability of the Revised Record of Decision EIS-0183: Notice of Availability of the Revised Record of Decision Bonneville Power Administration, Summit/Westward Project This notice announces the availability of the Revised ROD to offer contract terms for an optional electrical interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at a point near the existing Wauna Substation of the Clatskanie People's Utility District (CPUD), Columbia County, Oregon. EIS-0183; Notice of Availability of the Revised Record of Decision for the Bonneville Power Administration, Summit/Westward Project (October 2004) More Documents & Publications EIS-0183: Revised Record of Decision EIS-0183: Record of Decision

213

Carbon Fiber Electronic Interconnects.  

E-Print Network (OSTI)

??Carbon fiber is an emerging material in electrical and electronics industry. It has been used as contact in many applications, such as switch, potentiometer, and (more)

Deng, Yuliang

2007-01-01T23:59:59.000Z

214

GRR/Section 8-TX-b - ERCOT Interconnection | Open Energy Information  

Open Energy Info (EERE)

8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-b - ERCOT Interconnection 8-TX-b - ERCOT Interconnection Process.pdf Click to View Fullscreen Regulations & Policies PUCT Substantive Rule 25.198 Triggers None specified Click "Edit With Form" above to add content 8-TX-b - ERCOT Interconnection Process.pdf 8-TX-b - ERCOT Interconnection Process.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedures for interconnection with Electricity Reliability Council of Texas (ERCOT) in Texas. According to PUCT Substantive Rule 25.198, the responsibility for

215

IEEE 1547 Series of Standards: Interconnection Issues; Preprint  

DOE Green Energy (OSTI)

IEEE 1547TM 2003 Standard for Interconnecting Distributed Resources With Electric Power Systems is the first in the 1547 series of planned interconnection standards. Major issues and a wealth of constructive dialogue arose during 1547 development. There was also a perceived increased vitality in updating complementary IEEE standards and developing additional standards to accommodate modern electrical and electronics systems and improved grid communications and operations. Power engineers and other stakeholders looking to the future are poised to incorporate 1547 into their knowledge base to help transform our nation's aging distribution systems while alleviating some of the burden on existing transmission systems.

Basso, T.; DeBlasio, R.

2003-09-01T23:59:59.000Z

216

Record of Decision - Klondike III/ Biglow Canyon Wind Integration Project - 10-25-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Klondike III/Biglow Canyon Wind Integration Project Klondike III/Biglow Canyon Wind Integration Project DECISION The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE) 1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects,

217

INVESTIGATION OF NOVEL ALLOY TiC-Ni-Ni3Al FOR SOLID OXIDE FUEL CELL INTERCONNECT APPLICATIONS  

DOE Green Energy (OSTI)

Solid oxide fuel cell interconnect materials must meet stringent requirements. Such interconnects must operate at temperatures approaching 800 C while resisting oxidation and reduction, which can occur from the anode and cathode materials and the operating environment. They also must retain their electrical conductivity under these conditions and possess compatible coefficients of thermal expansion as the anode and cathode. Results are presented in this report for fuel cell interconnect candidate materials currently under investigation based upon nano-size titanium carbide (TiC) powders. The TiC is liquid phase sintered with either nickel (Ni) or nickel-aluminide (Ni{sub 3}Al) in varying concentrations. The oxidation resistance of the submicron grain TiC-metal materials is presented as a function weight change versus time at 700 C and 800 C for varying content of metal/intermetallic in the system. Electrical conductivity at 800 C as a function of time is also presented for TiC-Ni to demonstrate the vitality of these materials for interconnect applications. TGA studies showed that the weight gain was 0.8 mg/cm{sup 2} for TiC(30)-Ni(30wt.%) after 100 hours in wet air at 800 C and the weight gain was calculated to be 0.5205 mg/cm{sup 2} for TiC(30)- Ni(10 wt.%) after 100 hours at 700 C and 100 hours at 800 C. At room temperature the electrical conductivity was measured to be 2444 1/[ohm.cm] for TiC-Ni compositions. The electrical conductivities at 800 C in air was recorded to be 19 1/[ohm.cm] after 125 hours. Two identical samples were supplied to PNNL (Dr. Jeff Stevenson) for ASR testing during the pre-decision period and currently they are being tested there. Fabrication, oxidation resistance and electrical conductivity studies indicate that TiC-Ni-Ni{sub 3}Al ternary appears to be a very important system for the development of interconnect composition for solid oxide fuel cells.

Rasit Koc; Geoffrey Swift; Hua Xie

2005-01-25T23:59:59.000Z

218

Performance testing of small interconnected wind systems  

SciTech Connect

There is a need for performance information on small windmills intended for interconnected operation with utility distribution service. The owner or prospective buyer needs the data to estimate economic viability and service reliability, while the utility needs it to determine interconnection arrangements, maintain quality of power delivered by its line, and to answer customer inquiries. No existing testing program provides all the information needed, although the Rocky Flats test site comes close. To fill this need for Michigan, Consumers Power Company and the Michigan Electric Cooperative Association helped support a two-year program at Michigan State University involving extensive performance testing of an Enertech 1500 and a 4-kW Dakota with a Gemini inverter. The performance study suggested measurements necessary to characterize SWECS for interconnected operation. They include SWECS energy output to a-c line, miles of wind passing the rotor, var-hour metering for average var consumption, and recording watt, current, and voltmeters to assess SWECS output variability. Added instruments for waveform measurement (to assess power quality) are also needed. Typical data taken at the MSU test site are used to illustrate the techniques and preliminary data from a current project is given. Finally, conclusions about SWECS performance are listed.

Park, G.L.; Krauss, O.; Miller, J.

1984-05-01T23:59:59.000Z

219

PJM Interconnection, LLC | Open Energy Information  

Open Energy Info (EERE)

PJM Interconnection, LLC Jump to: navigation, search Name PJM Interconnection, LLC Place Norristown, PA References SGIC1 No information has been entered for this organization....

220

Kinsus Interconnect Technology Corp | Open Energy Information  

Open Energy Info (EERE)

Kinsus Interconnect Technology Corp Jump to: navigation, search Name Kinsus Interconnect Technology Corp Place Taiwan Sector Solar Product Engaged in the manufacture of chip...

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Western Electricity Coordinating Council (WECC) Webinar  

Energy.gov (U.S. Department of Energy (DOE))

Hosted by the Western Electricity Coordinating Council (WECC), the regional entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection, this...

222

Solid-state energy storage module employing integrated interconnect board  

DOE Patents (OSTI)

The present invention is directed to an improved electrochemical energy storage device. The electrochemical energy storage device includes a number of solid-state, thin-film electrochemical cells which are selectively interconnected in series or parallel through use of an integrated interconnect board. The interconnect board is typically disposed within a sealed housing which also houses the electrochemical cells, and includes a first contact and a second contact respectively coupled to first and second power terminals of the energy storage device. The interconnect board advantageously provides for selective series or parallel connectivity with the electrochemical cells, irrespective of electrochemical cell position within the housing. In one embodiment, a sheet of conductive material is processed by employing a known milling, stamping, or chemical etching technique to include a connection pattern which provides for flexible and selective interconnecting of individual electrochemical cells within the housing, which may be a hermetically sealed housing. Fuses and various electrical and electro-mechanical devices, such as bypass, equalization, and communication devices for example, may also be mounted to the interconnect board and selectively connected to the electrochemical cells.

Rouillard, Jean (Saint-Luc, CA); Comte, Christophe (Montreal, CA); Daigle, Dominik (St-Hyacinthe, CA); Hagen, Ronald A. (Stillwater, MN); Knudson, Orlin B. (Vadnais Heights, MN); Morin, Andre (Longueuil, CA); Ranger, Michel (Lachine, CA); Ross, Guy (Beloeil, CA); Rouillard, Roger (Beloeil, CA); St-Germain, Philippe (Outremont, CA); Sudano, Anthony (Laval, CA); Turgeon, Thomas A. (Fridley, MN)

2000-01-01T23:59:59.000Z

223

Renewable Systems Interconnection: Executive Summary  

DOE Green Energy (OSTI)

The U.S. Department of Energy launched the Renewable Systems Interconnection (RSI) study in 2007 to address the challenges to high penetrations of distributed renewable energy technologies. The RSI study consists of 14 additional reports.

Kroposki, B.; Margolis, R.; Kuswa, G.; Torres, J.; Bower, W.; Key, T.; Ton, D.

2008-02-01T23:59:59.000Z

224

Design considerations for high-data-rate chip interconnect systems  

Science Conference Proceedings (OSTI)

Over the past decade, data rates for electrical interconnects in interchip communications systems have experienced a dramatic increase from <1 Gb/s to 10 Gb/s and beyond to keep up with ever increasing demands for more I/O bandwidth from modern high-capacity ...

Troy Beukema

2010-10-01T23:59:59.000Z

225

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

DOE Green Energy (OSTI)

This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

Woodford, D.

2011-02-01T23:59:59.000Z

226

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

DOE Green Energy (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

227

Technology Assessment of Interconnection Products for Distributed Resources: Research and Development Recommendations  

Science Conference Proceedings (OSTI)

A compatible and economical connection with the resident electrical power system is a key to realizing the full value of distributed generation and storage. This technology assessment looks at the status of interconnection equipment used for interconnecting distributed generation and storage with electric power systems. The assessment is intended to identify business opportunities and to provide specific research and development recommendations based on a manufacturer survey and technical assessment desc...

2000-12-11T23:59:59.000Z

228

Development of Ceramic Interconnect Materials for SOFC  

SciTech Connect

Currently, acceptor-doped lanthanum chromite is the state-of-the-art ceramic interconnect material for high temperature solid oxide fuel cells (SOFCs) due to its fairly good electronic conductivity and chemical stability in both oxidizing and reducing atmospheres, and thermal compatibility with other cell components. The major challenge for acceptor-doped lanthanum chromite for SOFC interconnect applications is its inferior sintering behavior in air, which has been attributed to the development of a thin layer of Cr2O3 at the interparticle necks during the initial stages of sintering. In addition, lanthanum chromite is reactive with YSZ electrolyte at high temperatures, forming a highly resistive lanthanum zirconate phase (La2Zr2O7), which further complicates co-firing processes. Acceptor-doped yttrium chromite is considered to be one of the promising alternatives to acceptor-doped lanthanum chromite because it is more stable with respect to the formation of hydroxides in SOFC operating conditions, and the formation of impurity phases can be effectively avoided at co-firing temperatures. In addition, calcium-doped yttrium chromite exhibits higher mechanical strength than lanthanum chromite-based materials. The major drawback of yttrium chromite is considered to be its lower electrical conductivity than lanthanum chromite. The properties of yttrium chromites could possibly be improved and optimized by partial substitution of chromium with various transition metals. During FY10, PNNL investigated the effect of various transition metal doping on chemical stability, sintering and thermal expansion behavior, microstructure, electronic and ionic conductivity, and chemical compatibility with other cell components to develop the optimized ceramic interconnect material.

Yoon, Kyung J.; Stevenson, Jeffry W.; Marina, Olga A.

2010-08-05T23:59:59.000Z

229

Naturalistic Decision Making For Power System Operators  

Science Conference Proceedings (OSTI)

Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three Ts: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

2009-06-23T23:59:59.000Z

230

Interconnections with Increased Wind  

E-Print Network (OSTI)

The work described in this report was funded by the Federal Energy Regulatory Commission, Office of Electric Reliability through a subcontract administered by the Lawrence Berkeley National Laboratory, which is operated by the University of California for the U.S. Department of Energy under Contract No. DE-AC02-05CH11231. Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by its trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or The Regents of the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency

Ernest Orlando Lawrence; Peter Mackin; Ron Daschmans; Ben Williams; Brian Haney; Hunt Jeff Ellis; Peter Mackin; Ron Daschmans; Ben Williams; Brian Haney; All Hunt; Jeff Ellis

2010-01-01T23:59:59.000Z

231

Abstract--Forecasting of future electricity demand is very important for decision making in power system operation and  

E-Print Network (OSTI)

. In the 20 years prior to the Northwest Power Act, regional electrical loads were growing at 5 percent per predicted 2000 electricity loads of 23,400 average megawatts (average of medium-low and medium, and regional electricity loads in that year are estimated to have been 21,200. The third decade following

Ducatelle, Frederick

232

Superconducting Multilayer Interconnect - lbl.gov  

Technique to fabricate multilayer interconnects and multiturn flux transformers for use with direct current superconducting quantum interference ...

233

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

234

Decision-making in Electricity Generation Based on Global Warming Potential and Life-cycle Assessment for Climate Change  

E-Print Network (OSTI)

499, [OECD 2003] OECD. Decommissioning Nuclear Power Plants:maintenance, and ultimate decommissioning of electric poweremissions during the decommissioning of hydroelectric power

Horvath, Arpad

2005-01-01T23:59:59.000Z

235

Electric  

U.S. Energy Information Administration (EIA)

Average Retail Price of Electricity to ... Period Residential Commercial Industrial ... or usage falling within specified limits by rate ...

236

CCHP System with Interconnecting Cooling and Heating Network  

E-Print Network (OSTI)

The consistency between building heating load, cooling load and power load are analyzed in this paper. The problem of energy waste and low equipment usage in a traditional CCHP (combined cooling, heating and power) system with generated electricity not supplied to the grid is analyzed in detail. Further, the new concept of CCHP system with cooling and heating network interconnecting is developed. Then, the Olympic Park energy system is presented to illustrate the advantage and improvement both in economy performance and energy efficiency.

Fu, L.; Geng, K.; Zheng, Z.; Jiang, Y.

2006-01-01T23:59:59.000Z

237

Series interconnected photovoltaic cells and method for making same  

DOE Patents (OSTI)

A novel photovoltaic module and method for constructing the same are disclosed. The module includes a plurality of photovoltaic cells formed on a substrate and laterally separated by interconnection regions. Each cell includes a bottom electrode, a photoactive layer and a top electrode layer. Adjacent cells are connected in electrical series by way of a conductive-buffer line. The buffer line is also useful in protecting the bottom electrode against severing during downstream layer cutting processes. 11 figs.

Albright, S.P.; Chamberlin, R.R.; Thompson, R.A.

1995-01-31T23:59:59.000Z

238

Study of metallic materials for solid oxide fuel cell interconnect applications.  

DOE Green Energy (OSTI)

Metallic interconnect acts as a gas separator and a gas distributor and therefore, it needs to function adequately in two widely different environments. The interconnect material will be exposed to air on one side and natural gas or coal-derived synthesis gas on the other side. The viable material for the interconnect application must be resistant not only to oxidation but also carburization in hydrocarbon containing low-oxygen environments. In addition, the scales that develop on the exposed surfaces must possess adequate electrical conductivity for them to function as current leads over long service life of the fuel cell. This report addresses five topics of interest for the development of metallic interconnects with adequate performance in fuel cells for long service life. The research conducted over the years and the conclusions reached were used to identify additional areas of research on materials for improved performance of components, especially metallic interconnects, in the complex fuel cell environments. This report details research conducted in the following areas: measurement of area specific electrical resistivity, corrosion performance in dual gas environments by experiments using alloy 446, long term corrosion performance of ferritic and austenitic alloys in hydrogen and methane-reformed synthesis fuel-gas environments, approaches to reduce the area resistance of metallic interconnect, and reduction of electrical resistivity of alumina scales on metallic interconnect. Based on the key requirements for metallic interconnects and the data developed on the corrosion behavior of candidate materials in meeting those requirements, several areas are recommended for further research to develop metallic interconnects with acceptable and reliable long-term performance in solid oxide fuel cells.

Natesan, K.; Zeng, Z.; Nuclear Engineering Division

2009-04-24T23:59:59.000Z

239

On the State of the Art of Metal Interconnects for SOFC Application  

Science Conference Proceedings (OSTI)

One of the recent developments for Solid Oxide Fuel Cells (SOFC) is oxide component materials capable of operating at lower temperatures such as 700-800C. This lower temperature range has provided for the consideration of metallic interconnects which have several advantages over ceramic interconnects: low cost, ease in manufacturing, and high conductivity. Most metals and alloys will oxidize under both the anode and cathode conditions within an SOFC, thus a chief requirement is that the base metal oxide scale must be electrically conductive since this constitutes the majority of the electrical resistance in a metallic interconnect. Common high temperature alloys form scales that contain chrome, silicon and aluminum oxides among others. Under SOFC operating conditions chrome oxide is a semi-conductor while silicon and aluminum oxides are insulators. In this talk we will review the evolution in candidate alloys and surface modifications which constitute an engineered solution for SOFC interconnect applications.

Jablonski@netl.doe.gov

2011-02-27T23:59:59.000Z

240

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electricity Advisory Committee - Reports and Memos | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports and Memos Electricity Advisory Committee - Reports and Memos DOE Response to 2013 EAC Work Products, September 2013 Recommendations on Interconnection-Wide Planning, June...

242

Electricity  

Energy.gov (U.S. Department of Energy (DOE))

Electricity is an essential part of modern life. The Energy Department is working to create technology solutions that will reduce our energy use and save Americans money.

243

Cascade solar cell having conductive interconnects  

SciTech Connect

Direct ohmic contact between the cells in an epitaxially grown cascade solar cell is obtained by means of conductive interconnects formed through grooves etched intermittently in the upper cell. The base of the upper cell is directly connected by the conductive interconnects to the emitter of the bottom cell. The conductive interconnects preferably terminate on a ledge formed in the base of the upper cell.

Borden, Peter G. (Menlo Park, CA); Saxena, Ram R. (Saratoga, CA)

1982-10-26T23:59:59.000Z

244

Avista Utilities - Interconnection Guidelines (Idaho) | Open...  

Open Energy Info (EERE)

page on Facebook icon Twitter icon Avista Utilities - Interconnection Guidelines (Idaho) This is the approved revision of this page, as well as being the most recent. Jump...

245

A California Distributed Generation Primer: Interconnection and...  

NLE Websites -- All DOE Office Websites (Extended Search)

California Distributed Generation Primer: Interconnection and Beyond Synopsis Speaker(s): Scott Tomashefsky Date: January 10, 2002 - 12:00pm Location: Bldg. 90 Seminar HostPoint...

246

Probabilistic Analysis of Multistage Interconnection Network Performance  

E-Print Network (OSTI)

We present methods of calculating the value of two performance parameters for multipath, multistage interconnection networks: the normalized throughput and the probability of successful message transmission. We develop ...

Sobalvarro, Patrick G.

1992-04-01T23:59:59.000Z

247

D R A F T Evaluating Interconnect  

NLE Websites -- All DOE Office Websites (Extended Search)

R A F T Evaluating Interconnect and Virtualization Performance for High Performance Computing Lavanya Ramakrishnan R. Shane Canon Krishna Muriki Iwona Sakrejda Nicholas J. Wright...

248

SECA Core Technology Program - SOFC Interconnect Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Core Technology Program - SOFC Interconnect Meeting July 28-29, 2004 Table of Contents Disclaimer Participants PDF-17KB Presentations Products Disclaimer This report was prepared...

249

Degradation of Manganese Cobalt Spinel SOFC Interconnect ...  

Science Conference Proceedings (OSTI)

Presentation Title, Degradation of Manganese Cobalt Spinel SOFC Interconnect Coatings. Author(s), Jeffrey W. Fergus, Yingjia Liu, Yu Zhao. On-Site Speaker...

250

EIS-0435: Modification of the Groton Generation Station Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Modification of the Groton Generation Station 5: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota EIS-0435: Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Summary This EIS evaluates the environmental impacts of a proposal for DOE's Western Area Power Administration to modify its Large Generator Connection Agreement for the Groton Generation Station in Brown County, South Dakota. The modification would allow Basin Electric Power Cooperative, which operates the generation station, to produce power above the current operating limit of 50 average megawatts. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download June 3, 2011 EIS-0435: Final Environmental Impact Statement

251

Not a Babe in the Woods: Using MotorMaster Software to Make Sophisticated Electric Motor Purchase Decisions  

E-Print Network (OSTI)

Three-phase motors use more than half of all electricity in the United States. Energy efficient models are available in most motor classes in the 1 to 500 horsepower range, offering simple pay backs under two years. In practice, few motor buyers have performed an economic analysis, resulting in missed energy and dollar savings. MotorMaster software helps identify the best motor for a specific application. Its database of 9,000 motors includes the majority of three-phase motors sold in the United State. Performance information such as Full-Load RPM, torque and amperage rating identify models that meet specific design criteria. MotorMaster calculates operating costs and simple paybacks. This paper reviews the importance of proper electric motor selection and explains how MotorMaster software can be used to identify the most efficient, cost effective and reliable motor for each specific application.

Litman, T.

1993-03-01T23:59:59.000Z

252

Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States  

Science Conference Proceedings (OSTI)

Feed-in tariffs (FITs) have been used to promote renewable electricity development in over 40 countries throughout the past two decades. These policies generally provide guaranteed prices for the full system output from eligible generators for a fixed time period (typically 15-20 years). Due in part to the success of FIT policies in Europe, some jurisdictions in the United States are considering implementing similar policies, and a few have already put such policies in place. This report is intended to offer some guidance to policymakers and regulators on how generator interconnection procedures may affect the implementation of FITs and how state generator interconnection procedures can be formulated to support state renewable energy objectives. This report is based on a literature review of model interconnection procedures formulated by several organizations, as well as other documents that have reviewed, commented on, and in some cases, ranked state interconnection procedures.

Fink, S.; Porter, K.; Rogers, J.

2010-10-01T23:59:59.000Z

253

Interconnect Coupling Noise in CMOS VLSI Circuits  

E-Print Network (OSTI)

Interconnect between a CMOS driver and re- ceiver can be modeled as a 1ossy transmission line in high speed CMOS VLSI circuits as transition times become comparable to or less than the time of flight delay of the signal through the low resistivity interconnect. In this paper, closed form expressions for the coupling noise between adjacent interconnect are presented to estimate the coupling noise voltage on a quiet line. These expressions are based on an assumption that the interconnections are loosely coupled, where the effect of the coupling noise on the waveform of the active line is small and can be ne- glected. It is demonstrated that the output impedance of the CMOS driver should preferably be comparable to the interconnect impedance in order to reduce the propagation delay of the CMOS driver stage.

Kevin T. Tang; Eby G. Friedman

1999-01-01T23:59:59.000Z

254

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC cdrtrokArJclaeT 3 I+ &i, y I &OF I*- j< t j,fci..- ir )(yiT E-li, ( -,v? Cl -p4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson...

255

Corrosion of Metallic SOFC Interconnects in Coal Syngas  

Science Conference Proceedings (OSTI)

With recent reductions in the operating temperature of Solid Oxide Fuel Cells (SOFC), the potential of using metallic interconnect has gone up. There is also an interest in using Coal syngas as the fuel gas and thus there is a need to analyze the behavior and performance of metallic interconnects when exposed to Coal syngas. Three high temperature material alloys, Crofer 22 APU, Ebrite and Haynes 230, having the potential to be used as SOFC interconnects were studied in simulated wet coal syngas. These alloys were exposed to syngas at 800 degrees C and for 100 hours. The exposure to coal syngas led to the formation of oxides and spinels, which evidently led to an increase in electrical resistance. Oxidation in a reducing and carburizing environment leads to unique phase and morphology formations. A comparative analysis was carried out for all the three alloys, wherein the samples were characterized by using SEM, EDS, Raman and X-Ray diffraction to obtain the morphology, thickness, composition and crystal structure of the oxides and spinels

Dastane, R.R. (University of West Virginia); Liu, X. (University of West Virginia); Johnson, C., Mao, Scott (University of Pittsburgh)

2007-09-01T23:59:59.000Z

256

Development of a flip-chip composite interconnection system.  

E-Print Network (OSTI)

??The objective of this research is to develop a novel flip-chip composite interconnect structure to overcome the inherent weaknesses of the conventional solder bump interconnection. (more)

Wong, Stephen Chee Khuen.

2012-01-01T23:59:59.000Z

257

The regulation of internet interconnection : assessing network market power  

E-Print Network (OSTI)

Interconnection agreements in the telecommunications industry have always been constrained by regulation. Internet interconnection has not received the same level of scrutiny. Recent debates regarding proposed mergers, ...

Maida, Elisabeth M. (Elisabeth Marigo)

2013-01-01T23:59:59.000Z

258

Utility Wind Integration Group Distributed Wind/Solar Interconnection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Wind Integration Group Distributed WindSolar Interconnection Workshop Utility Wind Integration Group Distributed WindSolar Interconnection Workshop May 21, 2013 8:00AM...

259

Microsoft PowerPoint - 071410 SECA poster (ceramic interconnect...  

NLE Websites -- All DOE Office Websites (Extended Search)

C I DEVELOPMENT OF CERAMIC INTERCONNECT DEVELOPMENT OF CERAMIC INTERCONNECT M SOFC MATERIALS FOR SOFCS MATERIALS FOR SOFCS KYUNG JOONG YOON, JEFFRY W. STEVENSON, AND OLGA A. MARINA...

260

EIS-0437: Interconnection of the Buffalo Ridge III Wind Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection of the Buffalo Ridge III Wind Project, Brookings and Deuel Counties, South Dakota EIS-0437: Interconnection of the Buffalo Ridge III Wind Project, Brookings...

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EA-1902: Northern Wind Interconnection Project, Summit, South...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agencies You are here Home EA-1902: Northern Wind Interconnection Project, Summit, South Dakota EA-1902: Northern Wind Interconnection Project, Summit, South Dakota Summary...

262

ELECTRIC  

Office of Legacy Management (LM)

ELECTRIC ELECTRIC cdrtrokArJclaeT 3 I+ &i, y$ \I &OF I*- j< t j,fci..- ir )(yiT !E-li, ( \-,v? Cl -p/4.4 RESEARCH LABORATORIES EAST PITTSBURGH, PA. 8ay 22, 1947 Mr. J. Carrel Vrilson General ?!!mager Atomic Qxzgy Commission 1901 Constitution Avenue Kashington, D. C. Dear Sir: In the course of OUT nuclenr research we are planning to study the enc:ri;y threshold anti cross section for fission. For thib program we require a s<>piAroted sample of metallic Uranium 258 of high purity. A quantity of at lezst 5 grams would probably be sufficient for our purpose, and this was included in our 3@icntion for license to the Atonic Energy Coskqission.. This license has been approved, 2nd rre would Llp!Jreciate informztion as to how to ?r*oceed to obtain thit: m2teria.l.

263

Series interconnected photovoltaic cells and method for making same  

DOE Patents (OSTI)

A novel photovoltaic module (10) and method for constructing the same are disclosed. The module (10) includes a plurality of photovoltaic cells (12) formed on a substrate (14) and laterally separated by interconnection regions (15). Each cell (12) includes a bottom electrode (16), a photoactive layer (18) and a top electrode layer (20). Adjacent cells (12) are connected in electrical series by way of a conductive-buffer line (22). The buffer line (22) is also useful in protecting the bottom electrode (16) against severing during downstream layer cutting processes.

Albright, Scot P. (El Paso, TX); Chamberlin, Rhodes R. (El Paso, TX); Thompson, Roger A. (Littleton, CO)

1995-01-01T23:59:59.000Z

264

Western Interconnection Energy Imbalance Market Status and Prospects (Presentation)  

Science Conference Proceedings (OSTI)

This presentation describes how a new wholesale electricity market for energy imbalance ancillary services could be implemented and operated. Some conclusions of this presentation are: (1) Method for calculating additional reserve requirements due to wind and solar production; (2) EIM results in substantial reduction in reserves requirements and ramping demand; (3) Reduced participation reduces benefits for all but reduces the benefits to non-participants the most; (4) Full participation leads to maximum benefit across the Western Interconnection, up to 42% of total reserve requirement; and (5) Regional EIM implementations have smaller but substantial benefits.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-10-01T23:59:59.000Z

265

Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND Electric Energy Resources * ND Ranked #1 in U.S. for Wind Energy Potential - 1991 Pacific Northwest Labs study found ND Wind could potentially supply 36% of U.S. electric energy consumption. -

266

Hybrid Silicon Photonics for Optical Interconnects  

E-Print Network (OSTI)

and J. U. Yoon, Silicon photonics for compact, energy- ef?www.zurich.ibm.com/st/photonics/interconnects.html [3] R.comb laser, in Proc. SPIE Photonics West 2010, pp. 76070W

2011-01-01T23:59:59.000Z

267

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network (OSTI)

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

268

Interconnectable blocks for music and audio processing  

E-Print Network (OSTI)

This thesis describes the technical implementation of a set of interconnectable blocks designed to be used by children to explore the possibilities of digital sound manipulation. In contrast to similar modular systems, ...

McPherson, Andrew, 1982-

2005-01-01T23:59:59.000Z

269

Removing Barriers to Utility Interconnected Photovoltaic Inverters  

SciTech Connect

The Million Solar Roofs Initiative has motivated a renewed interest in the development of utility interconnected photovoltaic (UIPV) inverters. Government-sponsored programs (PVMaT, PVBONUS) and competition among utility interconnected inverter manufacturers have stimulated innovations and improved the performance of existing technologies. With this resurgence, Sandia National Laboratories (SNL) has developed a program to assist industry initiatives to overcome barriers to UIPV inverters. In accordance with newly adopted IEEE 929-2000, the utility interconnected PV inverters are required to cease energizing the utility grid when either a significant disturbance occurs or the utility experiences an interruption in service. Compliance with IEEE 929-2000 is being widely adopted by utilities as a minimum requirement for utility interconnection. This report summarizes work done at the SNL balance-of-systems laboratory to support the development of IEEE 929-2000 and to assist manufacturers in meeting its requirements.

Gonzalez, S.; Bonn, R.H.; Ginn, J.W.

2000-10-03T23:59:59.000Z

270

Interconnection Standards (Indiana) | Open Energy Information  

Open Energy Info (EERE)

provide three levels of interconnection to customer-generators. Level 1: Applies to inverter-based systems with a maximum nameplate capacity of 10 kilowatts (kW). These systems...

271

Stability of chromite interconnections in dual environments  

DOE Green Energy (OSTI)

One of the most critical technical concerns in high-temperature SOFCs is the physical, chemical, and electrical stability of the interconnect (typically a doped lanthanum chromite) in the dual (oxidizing and reducing atmosphere) SOFC environment. The reducing or fuel side may experience oxygen partial pressures (P(O{sub 2})) from 10{sup {minus}18} to 10{sup {minus}6} atmospheres, while the oxidizing side may have P(O{sub 2}) from 10{sup {minus}6} to greater than 1 atm. These conditions limit the possible candidate materials to lanthanum or yttrium chromites. In the past decade, much work has centered on development of air-sinterable chromites and understanding their physical properties; little work, however, has focused on the stability of these chromites in dual environments. Chromite powders were synthesized using the glycine-nitrate process. The powders were calcined at 1,000 C for 1 hour and then uniaxially pressed into bars (46mm x 16mm x 3mm) at 55 MPa and isostatically pressed at 138 MPa. Samples were sintered in air. The dependence of the physical properties of sintered lanthanum chromites upon ambient P(O{sub 2}) and temperature (using dilatometry, thermogravimetric analysis, and oxygen permeation measurements) were studied. La{sub 1{minus}x}A{sub x}CrO{sub 3} and Y{sub 1{minus}x}Ca{sub x}CrO{sub 3}, where A is Ca or Sr and x was varied from 0.1 to 0.4 were evaluated in this study. The P(O{sub 2}) was varied using a buffered CO{sub 2}/Ar-4%H{sub 2} gas system, enabling expansion measurements to be made over a partial pressure range from 10{sup {minus}5} to 10{sup {minus}18} atmosphere at 800, 900, and 1,000 C.

Armstrong, T.R.; Stevenson, J.W.; Raney, P.; Pederson, L.R.

1994-11-01T23:59:59.000Z

272

DOE/EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPRI 2013 Electricity Storage Handbook in Collaboration with EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) DOE/EPRI 2013 Electricity Storage Handbook in Collaboration with NRECA (July 2013) The Electricity Storage Handbook is a how-to guide for utility and rural cooperative engineers, planners, and decision makers to plan and implement energy storage projects. The Handbook also serves as an information resource for investors and venture capitalists, providing the latest developments in technologies and tools to guide their evaluations of energy storage opportunities. It includes a comprehensive database of the cost of current storage systems in a wide variety of electric utility and customer services, along with interconnection schematics. A list of significant past and present energy storage projects is provided for a practical

273

Interconnecting PV on New York City's Secondary Network Distribution System  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ???¢????????networks???¢??????? in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1???¢????????PV Deployment Analysis for New York City???¢????????we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2???¢????????A Briefing for Policy Makers on Connecting PV to a Network Grid???¢????????presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3???¢????????Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

274

Decisions decisions plant vessels  

Science Conference Proceedings (OSTI)

This paper describes concepts for a family of plant vessels that help users make decisions or reach goals. The concepts use plants to mark time or answer questions for the user, creating a connection between the user and the individual plant. These concepts ...

Jenny Liang

2007-08-01T23:59:59.000Z

275

National Rural Electric Cooperative Association: Residential Fuel Cell Demonstration Program  

DOE Green Energy (OSTI)

Summarizes the National Rural Electric Cooperative Association's work, under contract to DOE's Distribution and Interconnection R&D, to create a residential fuel cell demonstration program.

Not Available

2003-10-01T23:59:59.000Z

276

Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)  

DOE Green Energy (OSTI)

This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

2013-05-01T23:59:59.000Z

277

NREL Variability Analysis for the Western Interconnect (Presentation)  

DOE Green Energy (OSTI)

This presentation investigates the effects of several Energy Imbalance Markets implementations in the Western Interconnect.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

278

Ultracapacitors for Electric and Hybrid Vehicles - Performance Requirements, Status of the Technology, and R&D Needs  

E-Print Network (OSTI)

carbon and aluminum fibers such that the mechanical strength and electrical resistancecarbon fibers interconnected with metal fibers in the electrode would result in the desired low electrical resistance

Burke, Andrew F

1995-01-01T23:59:59.000Z

279

Resistive analysis of mixed carbon nanotube bundle interconnect and its comparison with copper interconnect  

Science Conference Proceedings (OSTI)

As resistivity of Copper (Cu) increases with technology scaling, this drives us to look for new interconnect material for future very large scale integration (VLSI). Mixed carbon nanotube (CNT) bundle has superior properties like current carrying capacity ... Keywords: copper, interconnect, mixed carbon nanotube bundle

T. Alam; R. Dhiman; R. Chandel

2011-02-01T23:59:59.000Z

280

Wind/PV Generation for Frequency Regulation and Oscillation Damping in the Eastern Interconnection  

SciTech Connect

This report presents the control of renewable energy sources, including the variable-speed wind generators and solar photovoltaic (PV) generators, for frequency regulation and inter-area oscillation damping in the U.S. Eastern Interconnection (EI). In this report, based on the user-defined wind/PV generator electrical control model and the 16,000-bus Eastern Interconnection dynamic model, the additional controllers for frequency regulation and inter-area oscillation damping are developed and incorporated and the potential contributions of renewable energy sources to the EI system frequency regulation and inter-area oscillation damping are evaluated.

Liu, Yong [The University of Tennessee, Knoxville] [The University of Tennessee, Knoxville; Gracia, Jose R [ORNL] [ORNL; Hadley, Stanton W [ORNL] [ORNL; Liu, Yilu [ORNL] [ORNL

2013-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Decision Summaries  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

oha/decision-summaries Office of Hearings and Appeals oha/decision-summaries Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en Summary of Decisions - December 30, 2013 - January 3, 2014 http://energy.gov/oha/articles/summary-decisions-december-30-2013-january-3-2014 decisions-december-30-2013-january-3-2014" class="title-link">Summary of Decisions - December 30, 2013 - January 3, 2014

282

Electricity Markets  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Markets Electricity Markets Researchers in the electricity markets area conduct technical, economic, and policy analysis of energy topics centered on the U.S. electricity sector. Current research seeks to inform public and private decision-making on public-interest issues related to energy efficiency and demand response, renewable energy, electricity resource and transmission planning, electricity reliability and distributed generation resources. Research is conducted in the following areas: Energy efficiency research focused on portfolio planning and market assessment, design and implementation of a portfolio of energy efficiency programs that achieve various policy objectives, utility sector energy efficiency business models, options for administering energy efficiency

283

Method of forming a leak proof plasma sprayed interconnection layer on an electrode of an electrochemical cell  

DOE Patents (OSTI)

A dense, substantially gas-tight, electrically conductive interconnection layer is formed on an electrode structure of an electrochemical cell by: (A) providing an electrode structure; (B) forming on a selected portion of the electrode surface, an interconnection layer having the general formula La{sub 1{minus}x}M{sub x}Cr{sub 1{minus}y}N{sub y}O{sub 3}, where M is a dopant selected from the group of Ca, Sr, Ba, and mixtures thereof, and where N is a dopant selected from the group of Mg, Co, Ni, Al, and mixtures thereof, and where x and y are each independently about 0.075--0.25, by thermally spraying, preferably plasma arc spraying, a flux added interconnection spray powder, preferably agglomerated, the flux added powder comprising flux particles, preferably including dopant, preferably (CaO){sub 12}(Al{sub 2}O{sub 3}){sub 7} flux particles including Ca and Al dopant, and LaCrO{sub 3} interconnection particles, preferably undoped LaCrO{sub 3}, to form a dense and substantially gas-tight interconnection material bonded to the electrode structure by a single plasma spraying step; and (C) heat treating the interconnection layer at from about 1,200 to 1,350 C to further densify and heal the micro-cracks and macro-cracks of the thermally sprayed interconnection layer. The result is a substantially gas-tight, highly doped, electrically conductive interconnection material bonded to the electrode structure. The electrode structure can be an air electrode, and a solid electrolyte layer can be applied to the unselected portion of the air electrode, and further a fuel electrode can be applied to the solid electrolyte, to form an electrochemical cell for generation of electrical power. 4 figs.

Kuo, L.J.H.; Vora, S.D.

1995-02-21T23:59:59.000Z

284

Method of forming a leak proof plasma sprayed interconnection layer on an electrode of an electrochemical cell  

SciTech Connect

A dense, substantially gas-tight, electrically conductive interconnection layer is formed on an electrode structure of an electrochemical cell by: (A) providing an electrode structure; (B) forming on a selected portion of the electrode surface, an interconnection layer having the general formula La.sub.1-x M.sub.x Cr.sub.1-y N.sub.y O.sub.3, where M is a dopant selected from the group of Ca, Sr, Ba, and mixtures thereof, and where N is a dopant selected from the group of Mg, Co, Ni, Al, and mixtures thereof, and where x and y are each independently about 0.075-0.25, by thermally spraying, preferably plasma arc spraying, a flux added interconnection spray powder, preferably agglomerated, the flux added powder comprising flux particles, preferably including dopant, preferably (CaO).sub.12. (Al.sub.2 O.sub.3).sub.7 flux particles including Ca and Al dopant, and LaCrO.sub.3 interconnection particles, preferably undoped LaCrO.sub.3, to form a dense and substantially gas-tight interconnection material bonded to the electrode structure by a single plasma spraying step; and, (C) heat treating the interconnection layer at from about 1200.degree. to 1350.degree. C. to further densify and heal the micro-cracks and macro-cracks of the thermally sprayed interconnection layer. The result is a substantially gas-tight, highly doped, electrically conductive interconnection material bonded to the electrode structure. The electrode structure can be an air electrode, and a solid electrolyte layer can be applied to the unselected portion of the air electrode, and further a fuel electrode can be applied to the solid electrolyte, to form an electrochemical cell for generation of electrical power.

Kuo, Lewis J. H. (Monroeville, PA); Vora, Shailesh D. (Monroeville, PA)

1995-01-01T23:59:59.000Z

285

Power System Generation and Inter-Connection Planning Model (SUPER) | Open  

Open Energy Info (EERE)

Power System Generation and Inter-Connection Planning Model (SUPER) Power System Generation and Inter-Connection Planning Model (SUPER) Jump to: navigation, search Tool Summary Name: Power System Generation and Inter-Connection Planning Model (SUPER) Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Renewable Energy, Hydro Topics: Resource assessment Resource Type: Software/modeling tools Website: www.olade.org/superEn.html References: SUPER website [1] "This model is useful for multi-year electricity system planning studies, making it possible to analyze, optimize, simulate and develop hydrothermal power system expansion plans." References ↑ "SUPER website" Retrieved from "http://en.openei.org/w/index.php?title=Power_System_Generation_and_Inter-Connection_Planning_Model_(SUPER)&oldid=329

286

Planarization of metal films for multilevel interconnects  

DOE Patents (OSTI)

In the fabrication of multilevel integrated circuits, each metal layer is anarized by heating to momentarily melt the layer. The layer is melted by sweeping laser pulses of suitable width, typically about 1 microsecond duration, over the layer in small increments. The planarization of each metal layer eliminates irregular and discontinuous conditions between successive layers. The planarization method is particularly applicable to circuits having ground or power planes and allows for multilevel interconnects. Dielectric layers can also be planarized to produce a fully planar multilevel interconnect structure. The method is useful for the fabrication of VLSI circuits, particularly for wafer-scale integration.

Tuckerman, David B. (Livermore, CA)

1989-01-01T23:59:59.000Z

287

Planarization of metal films for multilevel interconnects  

DOE Patents (OSTI)

In the fabrication of multilevel integrated circuits, each metal layer is anarized by heating to momentarily melt the layer. The layer is melted by sweeping laser pulses of suitable width, typically about 1 microsecond duration, over the layer in small increments. The planarization of each metal layer eliminates irregular and discontinuous conditions between successive layers. The planarization method is particularly applicable to circuits having ground or power planes and allows for multilevel interconnects. Dielectric layers can also be planarized to produce a fully planar multilevel interconnect structure. The method is useful for the fabrication of VLSI circuits, particularly for wafer-scale integration.

Tuckerman, David B. (Livermore, CA)

1987-01-01T23:59:59.000Z

288

PJM Interconnection Interview on Wind  

Wind Powering America (EERE)

Vol. 9, No. 5 - December 5, 2007 Vol. 9, No. 5 - December 5, 2007 PJM on wind Wind power is growing rapidly in the United States and in Pennsylvania where 8 wind farms that total 259 megawatts now operate. Those wind farms already generate enough power for about 80,000 homes. Another 4,714 megawatts are in various stages of development within Pennsylvania, which would create enough power for an additional 1.4 mil- lion homes. Just in the Keystone state, wind power is creating thousands of jobs. Across the nation, wind power provides hundreds of millions of dollars of tax payments and rental fees to land- owners, and displaces more and more electricity that would otherwise be made by burning coal, oil, or natural gas. Wind farms create zero air pollution; require no destructive

289

Hybrid silicon evanescent approach to optical interconnects  

E-Print Network (OSTI)

and dissi- pated electrical power, the thermal impedance offor the dissipated electrical power in the various lasera function of ap- plied electrical power to the laser (d?/

2009-01-01T23:59:59.000Z

290

Status of the IEEE P1547 Draft Interconnection Standard and Distributed Energy Resources R&D: Preprint  

DOE Green Energy (OSTI)

The Department of Energy (DOE) Distributed Power Program (DPP) is conducting work to complete, validate in the field, and support the development of a national interconnection standard for distributed energy resources (DER), and to address the institutional and regulatory barriers slowing the commercial adoption of DER systems. This work includes support for the IEEE standards, including P1547 Standard for Interconnecting Distributed Resources with Electric Power Systems, P1589 Standard for Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems, and the P1608 Application Guide. Work is also in progress on system integration research and development (R&D) on the interface and control of DER with local energy systems. Additional efforts are supporting high-reliability power for industry, evaluating innovative concepts for DER applications, and exploring plug-and-play interface and control technologies for intelligent autonomous interconnection systems. This paper summarizes (1) the current status of the IEEE interconnection standards and application guides in support of DER, and (2) the R&D in progress at the National Renewable Energy Laboratory (NREL) for interconnection and system integration and application of distributed energy resources.

Thomas, H. P.; Basso, T. S.; Kroposki, B.

2002-05-01T23:59:59.000Z

291

Development of Ni1-xCoxO as the cathode/interconnect contact for solid oxide fuel cells  

Science Conference Proceedings (OSTI)

A new type of material, Ni1-xCoxO, was developed for solid oxide fuel cell (SOFC) cathode/interconnect contact applications. The phase structure, coefficient of thermal expansion, sintering behavior, electrical property, and mechanical bonding strength of these materials were evaluated against the requirements of the SOFC cathode/interconnect contact. A dense cathode/interconnect contact layer was developed through reaction sintering from Ni and Co metal powders. An area specific resistance (ASR) as low as 5.5 mohm.cm2 was observed after 1000 h exposure in air at 800 C for the LSM/Ni0.33Co0.67O/AISI441 assembly. Average mechanical strengths of 6.8 and 5.0 MPa were obtained for the cathode/contact/cathode and interconnect/contact/interconnect structures, respectively. The significantly low ASR was probably due to the dense structure and therefore improved electrical conductivity of the Ni0.33Co0.67O contact and the good bonding of the interfaces between the contact and the cathode, and between the contact and the interconnect.

Lu, Zigui; Xia, Guanguang; Templeton, Joshua D.; Li, Xiaohong S.; Nie, Zimin; Yang, Zhenguo; Stevenson, Jeffry W.

2011-06-01T23:59:59.000Z

292

Interconnection Network for Tightly Coupled Accelerators Architecture  

Science Conference Proceedings (OSTI)

In recent years, heterogeneous clusters using accelerators have entered widespread use in high-performance computing systems. In such clusters, inter-node communication between accelerators normally requires several memory copies via CPU memory, which ... Keywords: PCI Express, Interconnect for accelerators, GPU cluster, Accelerator computing, Remote DMA

Toshihiro Hanawa, Yuetsu Kodama, Taisuke Boku, Mitsuhisa Sato

2013-08-01T23:59:59.000Z

293

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

buildings x) in nine climate zones x) hospitals, colleges,in nine different climate zones and three major utility

Stadler, Michael

2011-01-01T23:59:59.000Z

294

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

with commercial building microgrids Michael Stadler, Gonalocommercial building microgrids *) Michael Stadler GonaloSVOW), http://der.lbl.gov/microgrids-lbnl/current-project-

Stadler, Michael

2011-01-01T23:59:59.000Z

295

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

Energy Reliability, Distributed Energy Program of the U.S.National Laboratorys Distributed Energy Resources CustomerDivision DER-CAM The Distributed Energy Resources Customer

Stadler, Michael

2011-01-01T23:59:59.000Z

296

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

Presented at the UCLA Smart Grid Thought Leadership Forumand Energy Reliabilitys Smart Grids Program in the U.S.

Stadler, Michael

2011-01-01T23:59:59.000Z

297

Analysis of electric vehicle interconnection with commercial building microgrids  

E-Print Network (OSTI)

offices, and hotels Environmental Energy TechnologiesEnergy Resources and Demand Response under Uncertainty, IAEEs Rio 2010 International Conference, 6-9 June 2010, InterContinental Rio Hotel

Stadler, Michael

2011-01-01T23:59:59.000Z

298

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma...

299

EIS-0427: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Record of Decision 7: Record of Decision EIS-0427: Record of Decision Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona Western Area Power Administration (Western) received a request from Foresight Flying M, LLC (Foresight) to interconnect its proposed Grapevine Canyon Wind Project (Project) to Western's Glen Canyon-Pinnacle Peak No. 1 and No. 2 transmission lines. The Project would be located about 28 miles south and east of Flagstaff, in Coconino County, Arizona. On June 8, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) for Grapevine Canyon Wind Project was published in the Federal Register (77 FR 34041). After considering the environmental impacts, Western has decided to allow Foresight's request for interconnection to

300

Pb-free Solders and Emerging Interconnect and Packaging ...  

Science Conference Proceedings (OSTI)

In this Symposium, emerging interconnect and packaging technologies and insights into existing materials and technologies, including Pb-free, Pb-

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Analysis of challenges for on-chip optical interconnects  

Science Conference Proceedings (OSTI)

Optical interconnects are touted as the solution to the performance bottleneck of future interconnects in scaled technology nodes. Though significant strides have been made in realizing silicon photonic devices that can give high performance in controlled ... Keywords: modulator, on-chip optical interconnect, polarization sensitivity, ring-resonator, thermal sensitivity

Rajeev K. Dokania; Alyssa B. Apsel

2009-05-01T23:59:59.000Z

302

Interconnected networks and the governance of risk and trust  

Science Conference Proceedings (OSTI)

Interconnected networks constitute the backbone of our society and bring many advantages to our daily life and activities. At the same time, however, our dependence on these networks and the fact that they are all interconnected makes our society vulnerable. ... Keywords: Risk, governance, interconnection, networks, trust

Victor Bekkers; Marcel Thaens

2005-04-01T23:59:59.000Z

303

Technology Assessment of Interconnection Products for Distributed Resources: 2001 Update  

Science Conference Proceedings (OSTI)

This interim technology assessment for distributed resources (DR), including generation and storage, is intended to assist system engineers in understanding the availability and application of interconnection products. The report provides a frame of reference to assess these products by defining a set of interconnection functions, descriptive elements, and applications and documenting the state of the art of interconnection products.

2001-11-30T23:59:59.000Z

304

Testing and modeling of photo-electric modulators  

E-Print Network (OSTI)

Optical links are a promising alternative to the electrical interconnects that are currently used between chips within a computer. A crucial part of an optical link is a modulator, a device that converts an electrical ...

Weaver, Matthew J. (Matthew James)

2012-01-01T23:59:59.000Z

305

Explaining Embedded Software Modelling Decisions Jelena Marincic  

E-Print Network (OSTI)

Explaining Embedded Software Modelling Decisions Jelena Marincic Faculty of Electrical Engineering's devices, gadgets and machines become more intelligent, the complexity of embedded software con- trolling Mader Faculty of Electrical Engineering, Mathematics and Computer Science University of Twente

Al Hanbali, Ahmad

306

Frequency Instability Problems in North American Interconnections  

NLE Websites -- All DOE Office Websites (Extended Search)

Frequency Instability Problems in Frequency Instability Problems in North American Interconnections May 1, 2011 DOE/NETL-2011/1473 Frequency Instability Problems in North American Interconnections Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

307

Alternative materials for solid oxide fuel cells: Factors affecting air-sintering of chromite interconnections  

DOE Green Energy (OSTI)

The purpose of this research is to develop alternative materials for solid oxide fuel cell (SOFC) interconnections and electrodes with improved electrical, thermal and electrochemical properties. Another objective is to develop synthesis and fabrication processes for these materials whereby they can be consolidated in air into SOFCs. The approach is to (1) develop modifications of the current, state-of-the-art materials used in SOFCs, (2) minimize the number of cations used in the SOFC materials to reduce potential deleterious interactions, (3) improve thermal, electrical, and electrochemical properties, (4) develop methods to synthesize both state-of-the-art and alternative materials for the simultaneous fabrication and consolidation in air of the interconnections and electrodes with the solid electrolyte, and (5) understand electrochemical reactions at materials interfaces and the effects of component compositions and processing on those reactions.

Chick, L.A.; Bates, J.L.

1992-07-01T23:59:59.000Z

308

Incorporating Demand Response into Western Interconnection Transmissio...  

NLE Websites -- All DOE Office Websites (Extended Search)

side resources: policy, electricity markets, electricity markets and policy group, energy analysis and environmental impacts department Attachment Size PDF 702.25 KB Google...

309

Examination of Potential Benefits of an Energy Imbalance Market in the Western Interconnection  

SciTech Connect

In the Western Interconnection, there is significant interest in improving approaches to wide-area coordinated operations of the bulk electric power system, in part because of the increasing penetration of variable generation. One proposed solution is an energy imbalance market. This study focused on that approach alone, with the goal of identifying the potential benefits of an energy imbalance market in the year 2020.

Milligan, M.; Clark, K.; King, J.; Kirby, B.; Guo, T.; Liu, G.

2013-03-01T23:59:59.000Z

310

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

311

Effect of Electricity Mix and Ore Grade on the Carbon Footprint of ...  

Science Conference Proceedings (OSTI)

In Chile, 99.7% of electricity is generated by two interconnected grids, namely, the Northern (SING) and Southern (SIC) systems, featuring different technology...

312

Vertical Integration in Restructured Electricity Markets: Measuring Market Efficiency and Firm Conduct  

E-Print Network (OSTI)

Stoft. 2000. Monitoring the PJM Energy Market: SummerUnit (MMU). 2000-2001. PJM Interconnection State of theintegration of ?rms in the PJM market re- duces electricity

Mansur, Erin T.

2003-01-01T23:59:59.000Z

313

Phase 1 - Evaluation of a Functional Interconnect System for Solid Oxide Fuel Cells  

DOE Green Energy (OSTI)

This project is focused on evaluating the suitability of materials and complex multi-materials systems for use as solid oxide fuel cell interconnects. ATI Allegheny Ludlum has generated promising results for interconnect materials which incorporate modified surfaces. Methods for producing these surfaces include cladding, which permits the use of novel materials, and modifications via unique thermomechanical processing, which allows for the modification of materials chemistry. The University of Pittsburgh is assisting in this effort by providing use of their in-place facilities for dual atmosphere testing and ASR measurements, along with substantial work to characterize post-exposure specimens. Carnegie Mellon is testing interconnects for chromia scale spallation resistance using macro-scale and nano-scale indentation tests. Chromia spallation can increase electrical resistance to unacceptable levels and interconnect systems must be developed that will not experience spallation within 40,000 hours at operating temperatures. Spallation is one of three interconnect failure mechanisms, the others being excessive growth of the chromia scale (increasing electrical resistance) and scale evaporation (which can poison the cathode). The goal of indentation fracture testing at Carnegie Mellon is to accelerate the evaluation of new interconnect systems (by inducing spalls at after short exposure times) and to use fracture mechanics to understand mechanisms leading to premature interconnect failure by spallation. Tests include bare alloys from ATI and coated systems from DOE Laboratories and industrial partners, using ATI alloy substrates. West Virginia University is working towards developing a cost-effective material for use as a contact material in the cathode chamber of the SOFC. Currently materials such as platinum are well suited for this purpose, but are cost-prohibitive. For the solid-oxide fuel cell to become a commercial reality it is imperative that lower cost components be developed. Based on the results obtained to date, it appears that sterling silver could be an inexpensive, dependable candidate for use as a contacting material in the cathode chamber of the solid-oxide fuel cell. Although data regarding pure silver samples show a lower rate of thickness reduction, the much lower cost of sterling silver makes it an attractive alternative for use in SOFC operation.

James M. Rakowski

2006-09-30T23:59:59.000Z

314

FUNDAMENTAL STUDIES OF THE DURABILITY OF MATERIALS FOR INTERCONNECTS IN SOLID OXIDE FUEL CELLS  

SciTech Connect

This report describes the result of the first eight months of effort on a project directed at improving metallic interconnect materials for solid oxide fuel cells (SOFCs). The results include cyclic oxidation studies of a group of ferritic alloys, which are candidate interconnect materials. The exposures have been carried out in simulated fuel cell atmospheres. The oxidation morphologies have been characterized and the ASR has been measured for the oxide scales. The effect of fuel cell electric current density on chromia growth rates has been considered The thermomechanical behavior of the scales has been investigated by stress measurements using x-ray diffraction and interfacial fracture toughness measurements using indentation. The ultimate goal of this thrust is to use knowledge of changes in oxide thickness, stress and adhesion to develop accelerated testing methods for evaluating SOFC interconnect alloys. Finally a theoretical assessment of the potential for use of ''new'' metallic materials as interconnect materials has been conducted and is presented in this report. Alloys being considered include materials based on pure nickel, materials based on the ''Invar'' concept, and coated materials to optimize properties in both the anode and cathode gases.

Frederick S. Pettit; Gerald H. Meier

2003-06-30T23:59:59.000Z

315

Development of (Mn,Co)3O4 Protection Layers for Ferritic Stainless Steel Interconnects  

DOE Green Energy (OSTI)

A spinel-based surface protection layer has been developed for alloy SOFC current collectors and bi-polar gas separators. The (Mn,Co)3O4 spinel with a nominal composition of Mn1.5Co1.5O4 demonstrates an excellent electrical conductivity and thermal expansion match to ferritic stainless steel interconnects. A slurry-coating technique provides a viable approach for fabricating protective layers of the spinel onto the steel interconnects. Thermally grown protection layers of Mn1.5Co1.5O4 have been found not only to significantly decrease the contact resistance between a LSF cathode and stainless steel interconnect, but also inhibits the sub-scale growth on the stainless steel. The combination of the inhibited sub-scale growth, good thermal expansion matching between the spinel and the stainless steel, and the closed-pore structure contribute to the excellent structural and thermomechanical stability of these spinel protection layers, which was verified by a long-term thermal-cycling test. The spinel protection layers can also act effectively to prevent outward diffusion of chromium from the interconnect alloy, preventing subsequent chromium migration into the cathode and contact materials. PNNL is currently engaged in studies intended to optimize the composition, microstructure, and fabrication procedure for the spinel protection layers.

Yang, Zhenguo; Simner, Steven P.; Singh, Prabhakar; Xia, Guanguang; Stevenson, Jeffry W.

2005-07-05T23:59:59.000Z

316

Corrosion and Protection of Metallic Interconnects in Solid Oxide Fuel Cells  

SciTech Connect

Energy security and increased concern over environmental protection have spurred a dramatic world-wide growth in research and development of fuel cells, which electrochemically convert incoming fuel into electricity with no or low pollution. Fuel cell technology has become increasingly attractive to a number of sectors, including utility, automotive, and defense industries. Among the various types of fuel cells, solid oxide fuel cells (SOFCs) operate at high temperature (typically 650-1,000 C) and have advantages in terms of high conversion efficiency and the flexibility of using hydrocarbon fuels, in addition to hydrogen. The high temperature operation, however, can lead to increased mass transport and interactions between the surrounding environment and components that are required to be stable during a lifetime of thousands of hours and up to hundreds of thermal cycles. For stacks with relatively low operating temperatures (<800 C), the interconnects that are used to electrically connect a number of cells in series are typically made from cost-effective metals or alloys. The metallic interconnects must demonstrate excellent stability in a very challenging environment during SOFC operation, as they are simultaneously exposed to both an oxidizing (air) environment on the cathode side and a reducing environment (hydrogen or a reformed hydrocarbon fuel) on the anode side. Other challenges include the fact that water vapor is likely to be present in both of these environments, and the fuel is likely to contain impurities, such as sulfides. Since the fuel is usually a reformed hydrocarbon fuel, such as natural gas, coal gas, biogas, gasoline, etc., the interconnect is exposed to a wet carbonaceous environment at the anode side. Finally, the interconnect must be stable towards any adjacent components, such as electrodes, seals and electrical contact materials, with which it is in physical contact.

Yang, Z Gary; Stevenson, Jeffry W.; Singh, Prabhakar

2007-12-09T23:59:59.000Z

317

Modeling regional end user price/cost relationships in a widespread interconnected power system  

SciTech Connect

A combined programming and regression modeling approach is developed to analyze regional retail price/cost relationships for a widespread interconnected power system characterized by low population density and uniform (regulated) retail tariffs. The programming model is designed to calculate on the hour the delivered cost of electricity from 5 thermal power stations and one pumped storage hydrostation to end users in 8 distribution regions. A simultaneous equation regression model then analyses the link between retail prices charged end users, regional demand and supply characteristics, industry financial objectives and departures from economically efficient pricing. The electricity supply industry in Queensland Australia is used as a framework.

Tamaschke, R.; Docwra, G.; Stillman, R. [Univ. of Queensland, Brisbane, Queensland (Australia)

1995-11-01T23:59:59.000Z

318

Definition: Electric grid | Open Energy Information  

Open Energy Info (EERE)

grid grid Jump to: navigation, search Dictionary.png Electric grid A network of transmission lines, substations, transformers and more, that deliver electricity from power plants to consumers; In the continental U.S., the electric grid consists of three systems: the Eastern, Western Interconnect, and Texas Interconnects.[1][2][3][4] View on Wikipedia Wikipedia Definition An electrical grid is an interconnected network for delivering electricity from suppliers to consumers. It consists of generating stations that produce electrical power, high-voltage transmission lines that carry power from distant sources to demand centers, and distribution lines that connect individual customers. Power stations may be located near a fuel source, at a dam site, or to take advantage of renewable energy sources,

319

Environmental Regulation Impacts on Eastern Interconnection Performance  

SciTech Connect

In the United States, recent environmental regulations will likely result in the removal of nearly 30 GW of oil and coal-fired generation from the power grid, mostly in the Eastern Interconnection (EI). The effects of this transition on voltage stability and transmission line flows have previously not been studied from a system-wide perspective. This report discusses the results of power flow studies designed to simulate the evolution of the EI over the next few years as traditional generation sources are replaced with environmentally friendlier ones such as natural gas and wind.

Markham, Penn N [ORNL; Liu, Yilu [ORNL; Young II, Marcus Aaron [ORNL

2013-07-01T23:59:59.000Z

320

Updating Interconnection Screens for PV System Integration  

DOE Green Energy (OSTI)

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term and longer-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

Coddington, M.; Mather, B.; Kroposki, B.; Lynn, K.; Razon, A.; Ellis, A.; Hill, R.; Key, T.; Nicole, K.; Smith, J.

2012-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Repairable chip bonding/interconnect process  

DOE Patents (OSTI)

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules is disclosed. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder. 10 figs.

Bernhardt, A.F.; Contolini, R.J.; Malba, V.; Riddle, R.A.

1997-08-05T23:59:59.000Z

322

Repairable chip bonding/interconnect process  

DOE Patents (OSTI)

A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

Bernhardt, Anthony F. (Berkeley, CA); Contolini, Robert J. (Livermore, CA); Malba, Vincent (Livermore, CA); Riddle, Robert A. (Tracy, CA)

1997-01-01T23:59:59.000Z

323

VOLUME 46 JOURNAL OF APPLIED METEOROLOGY AND CLIMATOLOGY NOVEMBER 2007 Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms  

E-Print Network (OSTI)

Wind is the worlds fastest growing electric energy source. Because it is intermittent, though, wind is not used to supply baseload electric power today. Interconnecting wind farms through the transmission grid is a simple and effective way of reducing deliverable wind power swings caused by wind intermittency. As more farms are interconnected in an array, wind speed correlation among sites decreases and so does the probability that all sites experience the same wind regime at the same time. The array consequently behaves more and more similarly to a single farm with steady wind speed and thus steady deliverable wind power. In this study, benefits of interconnecting wind farms were evaluated for 19 sites, located in the midwestern United States, with annual average wind speeds at 80 m above ground, the hub height of modern wind turbines, greater than 6.9 m s ?1 (class 3 or greater). It was found that an average of 33 % and a maximum of 47 % of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power. Equally significant, interconnecting multiple wind farms to a common point and then connecting that point to a far-away city can allow the long-distance portion of transmission capacity to be reduced, for example, by 20 % with only a 1.6 % loss of energy. Although most parameters, such as intermittency, improved less than linearly as the number of interconnected sites increased, no saturation of the benefits

Cristina L. Archer; Mark; Z. Jacobson

2006-01-01T23:59:59.000Z

324

Topic B Awardee: Eastern Interconnection States' Planning Council |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection States' Eastern Interconnection States' Planning Council Topic B Awardee: Eastern Interconnection States' Planning Council The Eastern Interconnection States' Planning Council (EISPC) is an historic endeavor initially funded by an award from the United States Department of Energy (DOE) pursuant to a provision of the American Recovery and Reinvestment Act (ARRA). The goal is to create an unprecedented collaborative among the states in the Eastern Interconnection. Comprised of public utility commissions, Governors' offices, energy offices, and other key government representatives, this collaboration will foster and produce consistent and coordinated direction to the regional and interconnection-level analyses and planning. Significant state input and direction increases the probability that the outputs will be useful to the

325

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

326

Special Issue: Selected Research from the First Optical Interconnects Conference  

Science Conference Proceedings (OSTI)

This introduction to the special issue summarizes the creation of the first Optical Interconnects Conference, discusses some key themes in the field, and introduces the seven articles included in the special issue. Keywords: Special issues and sections,Optical interconnections,High performance computing,Silicon,Photonics,Data communications,Wavelength division multiplexing,wavelength division multiplexing,optical interconnects,high-performance computing,data centers,datacomm,silicon photonics

Jeffrey A. Kash, Raymond G. Beausoleil

2013-01-01T23:59:59.000Z

327

Interconnection Guidelines (Alaska) | Open Energy Information  

Open Energy Info (EERE)

Fed. Government, Industrial, Institutional, Local Government, Residential, Schools, State Government Eligible Technologies Anaerobic Digestion, Biomass, Geothermal Electric,...

328

Method of doping interconnections for electrochemical cells  

DOE Patents (OSTI)

A dense, electronically conductive interconnection layer 26 is bonded on a porous, tubular, electronically conductive air electrode structure 16, optionally supported by a ceramic support 22, by (A) forming a layer of oxide particles of at least one of the metals Ca, Sr, Co, Ba or Mg on a part 24 of a first surface of the air electrode 16, (B) heating the electrode structure, (C) applying a halide vapor containing at least lanthanum halide and chromium halide to the first surface and applying a source of oxygen to a second opposite surface of the air electrode so that they contact at said first surface, to cause a reaction of the oxygen and halide and cause a dense lanthanum-chromium oxide structure to grow, from the first electrode surface, between and around the oxide particles, where the metal oxide particles get incoporated into the lanthanum-chromium oxide structure as it grows thicker with time, and the metal ions in the oxide particles diffuse into the bulk of the lanthamum-chromium oxide structure, to provide a dense, top, interconnection layer 26 on top of the air electrode 16. A solid electrolyte layer 18 can be applied to the uncovered portion of the air electrode, and a fuel electrode 20 can be applied to the solid electrolyte, to provide an electrochemical cell 10.

Pal, Uday B. (Monroeville, PA); Singhal, Subhash C. (Murrysville, PA); Moon, David M. (Pittsburgh, PA); Folser, George R. (Lower Burrell, PA)

1990-01-01T23:59:59.000Z

329

Investigation of Oxidation-Resistant Alloy Interconnects for use in Planar SOFC Stacks  

Science Conference Proceedings (OSTI)

Over the past several years, advances in materials and fabrication techniques for planar SOFCs have allowed for a reduction in SOFC operating temperatures (e.g., 650-800C)[1]. Consequently, relatively inexpensive ferritic stainless steels that have good thermal expansion matching with the ceramic cells are now considered to be among the most promising candidate materials for the construction of interconnects in SOFC stacks. To function well in the stacks, the metallic interconnects must demonstrate: (i) Excellent stability over thousands of hours in a very challenging dual environment, as they are exposed simultaneously to a reducing atmosphere (fuel, such as hydrogen) on one side and an oxidizing atmosphere (air) on the other side; (ii) High electrical conductivity through both the bulk material and in-situ formed oxide scales; (iii) Bulk and interfacial thermal mechanical reliability and durability at the operating temperature; (iv) Compatibility with other materials in contact with interconnects such as seals and electrical contact materials. Our screening work[2-4] has indicated that only few, if any, traditional compositions could completely satisfy the aforementioned materials requirements in the long term. This paper summarizes the results of our evaluation of newly developed alloys and selected oxide-coated stainless steels. In addition, the anomalous oxidation of stainless steels under the dual environment is also briefly discussed.

Yang, Z Gary; Walker, Matthew S.; Singh, Prabhakar; Stevenson, Jeffry W.

2003-11-03T23:59:59.000Z

330

Pb-Free Solders and Next Generation Interconnects  

Science Conference Proceedings (OSTI)

Meeting, Materials Science & Technology 2012. Symposium, Pb-Free Solders and Next Generation Interconnects. Sponsorship. Organizer(s), Thomas R. Bieler ,...

331

All Copper Flip-Chip Interconnect - Programmaster.org  

Science Conference Proceedings (OSTI)

Abstract Scope, A novel flip-chip technology using electroless copper deposition has been used to produce all-copper, chip-to-substrate interconnect.

332

Pepco and PJM Interconnection Comments on District of Columbia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pepco and PJM Interconnection Comments on District of Columbia Public Service Commission, Docket No. EO-05-01 Comments and Answer to Requests for Rehearing Pepco and PJM...

333

Response from PJM Interconnection LLC and Pepco to Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Interconnection LLC and Pepco to Department of Energy Request for Information Concerning the Potential Need for Potomac River Station Generation Response from PJM...

334

Characterization of Mn-Co Electrodeposition for SOFC Interconnect ...  

Science Conference Proceedings (OSTI)

Presentation Title, Characterization of Mn-Co Electrodeposition for SOFC Interconnect Applications by QCM. Author(s), Junwei Wu, Ayyakkannu Manivannan,...

335

Microsoft Word - Poster Abstract_2010_PNNL_Ceramic Interconnect...  

NLE Websites -- All DOE Office Websites (Extended Search)

3: Development of Ceramic Interconnect Materials for SOFC Kyung Joong Yoon, Jeffry W. Stevenson, and Olga Marina A-site calcium doped yttrium chromite was additionally doped with...

336

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

Science Conference Proceedings (OSTI)

Presentation Title, Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects. Author(s), Heather McCrabb, Tim Hall, Junwei Wu, Hui Zhang, Xingbo Liu,...

337

The 8th TMS Lead Free Solder and Interconnect Technology ...  

Science Conference Proceedings (OSTI)

TMS 2012: Continuing Education: The 8th TMS Lead Free Solder and Interconnect Technology Workshop March 11-15, 2012 Orlando, FL. Who should attend:

338

Pb-Free Solders and Next Generation Interconnects  

Science Conference Proceedings (OSTI)

About this Symposium. Meeting, Materials Science & Technology 2011. Symposium, Pb-Free Solders and Next Generation Interconnects. Sponsorship, MS&T...

339

Microgrid V2G Charging Station Interconnection Testing (Presentation)  

Science Conference Proceedings (OSTI)

This presentation by Mike Simpson of the National Renewable Energy Laboratory (NREL) describes NREL's microgrid vehicle-to-grid charging station interconnection testing.

Simpson, M.

2013-07-01T23:59:59.000Z

340

Pb-free Solders and Advanced Interconnecting Materials  

Science Conference Proceedings (OSTI)

... Pb-free solders and interconnects for automotive and power electronics ... and Orientation Evolution in Sn-Ag-Cu Solder Joints in Ball Grid Array Packages.

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Electric Power Annual 2009 - Energy Information Administration  

U.S. Energy Information Administration (EIA)

electric power industry statistics at the national level. The publication provides industry decision-makers, government policymakers,

342

The Development of Interconnection Standards in Six States In 2007-2008  

SciTech Connect

This paper discusses the process of developing standards for the interconnection of photovoltaic systems and other generators under ten megawatts to the electric grid. State utility commission rulemakings in 2007-2008 in Florida, New Mexico, North Carolina, Maryland, Illinois and Utah provide the basis for analysis of what is and should be considered in the development of standards, and how the process can be improved. State interconnection standards vary substantially, and many utilities have discretion to establish additional or different requirements, creating literally hundreds of sets of rules. This lack of uniformity imposes a significant cost on project developers and installers to track and comply with applicable rules. As well, burdensome provisions and uncertain costs and timelines present formidable barriers to entry, which advocates have limited resources to challenge. For a better process, the author proposes: establishing federal standards as a baseline, involving solar advocates, and developing a utility cost-recovery mechanism.

Keyes, Jason B.

2008-04-01T23:59:59.000Z

343

Trinity Public Utilities District Direct Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEAD FEDERAL AGENCY: U.S. Department of Energy LEAD FEDERAL AGENCY: U.S. Department of Energy COOPERATING AGENCIES: U.S. Forest Service, U.S. Bureau of Land Management, U.S. Bureau of Reclamation TITLE: Final Environmental Impact Statement for the Trinity Public Utilities District Direct Interconnection Project, DOE/EIS-0389 LOCATION: Trinity County, California CONTACT: For additional information on this For general information on the final environmental impact U.S. Department of Energy National statement, contact: Environmental Policy Act process, write or call: Mr. Mark J. Wieringa Ms. Carol M. Borgstrom, Director Western Area Power Administration Office of NEPA Policy and Compliance P.O. Box 281213 Health, Safety and Security (GC-20) Lakewood, CO 80228 U.S. Department of Energy

344

Towards Modeling Interconnection Networks of Exascale Systems with OMNet++  

Science Conference Proceedings (OSTI)

One of the objectives of the decade for High-Performance Computing systems is to reach the exascale level of computing power before 2018, hence this will require strong efforts in their design. In that sense, High-speed low-latency interconnection networks ... Keywords: HPC interconnection networks, Performance evaluation, Simulation tools, OMNeT++

Pedro Yebenes, Jesus Escudero-Sahuquillo, Pedro J. Garcia, Francisco J. Quiles

2013-02-01T23:59:59.000Z

345

An efficient approach to simultaneous transistor and interconnect sizing  

Science Conference Proceedings (OSTI)

In this paper, we study the simultaneous transistor and interconnect sizing (STIS) problem. We define a class of optimization problems as CH-posynomial programs and reveal a general dominance property for all CH-posynomial programs. We show that the ... Keywords: CH-posynomial programs, STIS, circuit CAD, driver/buffer, transistor and interconnect sizing, transistor sizing, wire sizing problem

Jason Cong; Lei He

1997-01-01T23:59:59.000Z

346

Updating Small Generator Interconnection Procedures for New Market Conditions  

SciTech Connect

Federal and state regulators are faced with the challenge of keeping interconnection procedures updated against a backdrop of evolving technology, new codes and standards, and considerably transformed market conditions. This report is intended to educate policymakers and stakeholders on beneficial reforms that will keep interconnection processes efficient and cost-effective while maintaining a safe and reliable power system.

Coddington, M.; Fox, K.; Stanfield, S.; Varnado, L.; Culley, T.; Sheehan, M.

2012-12-01T23:59:59.000Z

347

Large-scale integrated photonics for high-performance interconnects  

Science Conference Proceedings (OSTI)

Moore's Law has set great expectations that the performance of information technology will improve exponentially until at least the end of this decade. Although the physics of silicon transistors alone might allow these expectations to be met, the physics ... Keywords: DWDM, Hardware, Optical interconnects, interconnects

Raymond G. Beausoleil

2011-06-01T23:59:59.000Z

348

Interconnection of asynchronous Boolean networks, asymptotic and transient dynamics  

Science Conference Proceedings (OSTI)

The dynamics of the interconnection of two Boolean networks is analyzed directly from the properties of the two individual modules. Motivated by biological systems where multiple timescales are present, we consider asynchronous Boolean networks, whose ... Keywords: Asynchronous Boolean networks, Model reduction, Multicellular systems, System interconnection

Laurent Tournier; Madalena Chaves

2013-04-01T23:59:59.000Z

349

Interconnection-Wide Transmission Planning Initiative - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

350

Learn More About Interconnections | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

351

Interconnection Standards (Utah) | Open Energy Information  

Open Energy Info (EERE)

utilities, electric cooperatives External Disconnect Switch Not required for inverter-based systems 10 kW or less; required for all other systems Insurance Requirements...

352

Managing for Biodiversity: Emerging Ideas for the Electric Utility Industry: Environmental Management: An International Journal for Decision Makers, Scientists, and Environmental Auditors - Volume 20, Number 6  

Science Conference Proceedings (OSTI)

It has been concluded that protecting global biodiversity requires the cooperation of all entities. The papers in this special issue illustrate how the government and private sector needs to work together to address varied biodiversity issues. These 24 peer-reviewed accepted papers, representing the majority of the presentations, were given at a conference held in Williamsburg, Virginia during March 19-20, 1996. The conference focused on: identifying and understanding biodiversity issues for electric uti...

1999-07-03T23:59:59.000Z

353

Low Carbon Jobs in an Interconnected World | Open Energy Information  

Open Energy Info (EERE)

Jobs in an Interconnected World Jobs in an Interconnected World Jump to: navigation, search Name Low Carbon Jobs in an Interconnected World Agency/Company /Organization Global Climate Network Partner Institute for Public Policy Research Sector Energy Focus Area Energy Efficiency, Renewable Energy Topics Co-benefits assessment, Background analysis Website http://www.ippr.org.uk/publica Country Australia, Brazil, China, Germany, India, Nigeria, South Africa, United Kingdom, United States Australia and New Zealand, South America, Eastern Asia, Western Europe, Southern Asia, Western Africa, Southern Africa, Northern Europe, Northern America References Low Carbon Jobs in an Interconnected World[1] Low Carbon Jobs in an Interconnected World Author: Global Climate Network Price: Free Publication Date: 30 March 2010

354

Clad metals by roll bonding for SOFC interconnects  

Science Conference Proceedings (OSTI)

Metallic interconnects have been becoming an increasingly interesting topic in the development in intermediate temperature solid oxide fuel cells (SOFC). High temperature oxidation resistant alloys are currently considered as candidate materials. Among these alloys however, different groups of alloys demonstrate different advantages and disadvantages, and few if any can completely satisfy the stringent requirements for the application. To integrate the advantages and avoid the disadvantages of different groups of alloys, clad metal has been proposed for SOFC interconnect applications and interconnect structures. This paper gives a brief overview of the cladding approach and its applications, and discuss the viability of this technology to fabricate the metallic layered-structure interconnects. To examine the feasibility of this approach, the austenitic Ni-base alloy Haynes 230 and the ferritic stainless steel AL 453 were selected as examples and manufactured into a clad metal. Its suitability as an interconnect construction material was investigated.

Chen, L.; Jha, B; Yang, Z Gary; Xia, Gordon; Stevenson, Jeffry W.; Singh, Prabhakar

2006-08-01T23:59:59.000Z

355

, Analysis of U.S. Net Metering and Interconnection Policy  

SciTech Connect

Historically, the absence of interconnection standards has been one of the primary barriers to the deployment of distributed generation (DG) in the United States. Although significant progress in the development of interconnection standards was achieved at both the federal and state levels in 2005, interconnection policy and net-metering policy continue to confound regulators, lawmakers, DG businesses, clean-energy advocates and consumers. For this reason it is critical to keep track of developments related to these issues. The North Carolina Solar Center (NCSC) is home to two Interstate Renewable Energy Council (IREC) projects -- the National Interconnection Project and the Database of State Incentives for Renewable Energy (DSIRE). This paper will present the major federal and state level policy developments in interconnection and net metering in 2005 and early 2006. It will also present conclusions based an analysis of data collected by these two projects.

Haynes, Rusty; Cook, Chris

2006-07-01T23:59:59.000Z

356

Case Study - Western Electricity Coordinating Council  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Smart Grid Strategy for Assuring Reliability of the Western Grid A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. WECC and its members manage the operation and planning of the vast interconnected transmission system connecting generators and loads across almost 1.8 million square miles of territory. The Western Interconnection Synchrophasor Program (WISP), led by WECC and involving 18 partners, is an initiative to modernize operation of the transmission system in the Western Interconnection, increasing reliability and system performance, and enabling greater use of renewable resources such as solar, hydro, and wind.

357

EIS-0308: Record of Decision and Floodplain Statement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Record of Decision and Floodplain Statement 8: Record of Decision and Floodplain Statement EIS-0308: Record of Decision and Floodplain Statement Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 2, 230-kilovolt Transmission Lines Western has determined that no significant environmental impacts will result from construction, operation and maintenance of Calpine Corporation's Southpoint Power Plant, the two natural gas pipelines, or the approximately 7 miles of high voltage transmission lines, or from the upgrade of the Parker-Davis No. 1 230-kilovolt (kV) transmission line. Therefore, Western has decided to provide an interconnection with the plant and Western's transmission system in west central Arizona. However, Calpine has yet to obtain a permit from the Bureau of Land Management (BLM)

358

Reactive power interconnection requirements for PV and wind plants : recommendations to NERC.  

DOE Green Energy (OSTI)

Voltage on the North American bulk system is normally regulated by synchronous generators, which typically are provided with voltage schedules by transmission system operators. In the past, variable generation plants were considered very small relative to conventional generating units, and were characteristically either induction generator (wind) or line-commutated inverters (photovoltaic) that have no inherent voltage regulation capability. However, the growing level of penetration of non-traditional renewable generation - especially wind and solar - has led to the need for renewable generation to contribute more significantly to power system voltage control and reactive power capacity. Modern wind-turbine generators, and increasingly PV inverters as well, have considerable dynamic reactive power capability, which can be further enhanced with other reactive support equipment at the plant level to meet interconnection requirements. This report contains a set of recommendations to the North-America Electricity Reliability Corporation (NERC) as part of Task 1-3 (interconnection requirements) of the Integration of Variable Generation Task Force (IVGTF) work plan. The report discusses reactive capability of different generator technologies, reviews existing reactive power standards, and provides specific recommendations to improve existing interconnection standards.

McDowell, Jason (General Electric, Schenectady, NY); Walling, Reigh (General Electric, Schenectady, NY); Peter, William (SunPower, Richmond, CA); Von Engeln, Edi (NV Energy, Reno, NV); Seymour, Eric (AEI, Fort Collins, CO); Nelson, Robert (Siemens Wind Turbines, Orlando, FL); Casey, Leo (Satcon, Boston, MA); Ellis, Abraham; Barker, Chris. (SunPower, Richmond, CA)

2012-02-01T23:59:59.000Z

359

Evaluation of a Surface Treatment on the Performance of Stainless Steels for SOFC Interconnect Applications  

Science Conference Proceedings (OSTI)

Pack cementation-like Cerium based surface treatments have been found to be effective in enhancing the oxidation resistance of ferritic steels (Crofer 22APU) for solid oxide fuel cell (SOFC) applications. The application of either a CeN- or CeO2 based surface treatment results in a decrease in weight gain by a factor of three after 4000 hours exposure to air+3%H2O at 800oC. Similar oxide scales formed on treated and untreated surfaces, with a continuous Cr-Mn outer oxide layer and a continuous inner Cr2O3 layer formed on the surface. However, the thickness of the scales, and the amount of internal oxidation were significantly reduced with the treatment, leading to the decrease in oxidation rate. This presentation will detail the influence of the treatment on the electrical properties of the interconnect. Half-cell experiments (LSM cathode sandwiched between two steel interconnects) and full SOFC button cell experiments were run with treated and untreated interconnects. Preliminary results indicate the Ce treatment can improve SOFC performance.

Alman, D.E.; Holcomb, Adler, T.A.; G.R.; Wilson, R.D.; Jablonski, P.D.

2007-04-01T23:59:59.000Z

360

EIS-0197: Supplement to Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement to Record of Decision 7: Supplement to Record of Decision EIS-0197: Supplement to Record of Decision Delivery of the Canadian Entitlement The United States Entity has decided to supplement an earlier decision regarding the Canadian Entitlement. The United States Entity issued a Delivery of the Canadian Entitlement Record of Decision (ROD) on November 8, 1996. The ROD was based on the Delivery of the Canadian Entitlement Environmental Impact Statement (DOE/EIS- 0197, issued in January 1996). The November 1996 ROD announced the United States Entity decision to fulfill its obligation under the Columbia River Treaty (Treaty) between Canada and the United States of America (United States) by delivering the full Canadian Entitlement (Entitlement) at existing transmission interconnections between the United States and Canada near Blaine,

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

PP-82-3 The Joint Owners of the Highgate Interconnection Facilities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 The Joint Owners of the Highgate Interconnection Facilities PP-82-3 The Joint Owners of the Highgate Interconnection Facilities Presidential Permit authorizing The Joint Owners...

362

Method and closing pores in a thermally sprayed doped lanthanum chromite interconnection layer  

DOE Patents (OSTI)

A dense, substantially gas-tight electrically conductive interconnection layer is formed on an air electrode structure of an electrochemical cell by (A) providing an air electrode surface; (B) forming on a selected portion of the electrode surface, a layer of doped LaCrO{sub 3} particles doped with an element or elements selected from Ca, Sr, Ba, Mg, Co, Ni, Al and mixtures thereof by thermal spraying doped LaCrO{sub 3} particles, either by plasma arc spraying or flame spraying; (C) depositing a mixture of CaO and Cr{sub 2}O{sub 3} on the surface of the thermally sprayed layer; and (D) heating the doped LaCrO{sub 3} layer coated with CaO and Cr{sub 2}O{sub 3} surface deposit at from about 1,000 C to 1,200 C to substantially close the pores, at least at a surface, of the thermally sprayed doped LaCrO{sub 3} layer. The result is a dense, substantially gas-tight, highly doped, electrically conductive interconnection material bonded to the electrode surface. A solid electrolyte layer can be applied to the nonselected portion of the air electrode. A fuel electrode can be applied to the solid electrolyte, to form an electrochemical cell, for example for generation of electrical power. 5 figs.

Singh, P.; Ruka, R.J.

1995-02-14T23:59:59.000Z

363

Review of the Recent Frequency Performance of the Eastern, Western and ERCOT Interconnections  

SciTech Connect

The reliable operation of an electric power system depends on careful management of the balance between generation and load to ensure that system frequency is maintained within narrow bounds around a scheduled value. Yet, maintaining frequency at the scheduled value is challenging because the load served is continuously changing, and occasionally, events such as the sudden loss of a large generation plant or large amount of load, cause frequency to deviate abruptly. This report reviews the recent history of frequency performance for all three U.S. interconnections: Eastern, Western, and the Electric Reliability Council of Texas (ERCOT). The review is based on data collected by the North American Electric Reliability Corporation (NERC). The review focuses on frequency response, which measures the performance of the interconnections immediately following sudden, large imbalances between load and generation. Trends in frequency response are presented and preliminary efforts are made to relate frequency response to other aspects of frequency performance and to examine aspects of the methods used to calculate frequency response.

Lacommare, Kristina S H

2010-12-20T23:59:59.000Z

364

Method and closing pores in a thermally sprayed doped lanthanum chromite interconnection layer  

SciTech Connect

A dense, substantially gas-tight electrically conductive interconnection layer is formed on an air electrode structure of an electrochemical cell by (A) providing an air electrode surface; (B) forming on a selected portion of the electrode surface, a layer of doped LaCrO.sub.3 particles doped with an element or elements selected from Ca, Sr, Ba, Mg, Co, Ni, Al and mixtures thereof by thermal spraying doped LaCrO.sub.3 particles, either by plasma arc spraying or flame spraying; (C) depositing a mixture of CaO and Cr.sub.2 O.sub.3 on the surface of the thermally sprayed layer; and (D) heating the doped LaCrO.sub.3 layer coated with CaO and Cr.sub.2 O.sub.3 surface deposit at from about 1000.degree. C. to 1200.degree. C. to substantially close the pores, at least at a surface, of the thermally sprayed doped LaCrO.sub.3 layer. The result is a dense, substantially gas-tight, highly doped, electrically conductive interconnection material bonded to the electrode surface. A solid electrolyte layer can be applied to the nonselected portion of the air electrode. A fuel electrode can be applied to the solid electrolyte, to form an electrochemical cell, for example for generation of electrical power.

Singh, Prabhakar (Export, PA); Ruka, Roswell J. (Pittsburgh, PA)

1995-01-01T23:59:59.000Z

365

Definitional-mission report: I-shaped power-interconnection study in Thailand. Export trade information  

SciTech Connect

The Government of Thailand is implementing a Southern Seaboard Development Project. The developing of the project will increase demand for all utility and infrastructure systems and services. The distribution of electric power in the new area falls within the responsibility of the Provincial Electricity Authority (PEA). The U.S. Trade and Development Program (TDP) funded a Definitional Mission to evaluate the prospects of TDP funding a feasibility study for an I-Shaped power interconnection study for supplying electricity to the 15 provinces in Southern Thailand. The mission concluded that TDP should provide a grant to PEA to select a U.S. firm to carry out the proposed I-Shaped Interconnection study for power distribution in southern Thailand. The overall potential for exports resulting from the project is conservatively estimated at $120 million, not including any follow-on work and spare parts inventory, typical of such projects. TDP's program in Thailand has enjoyed enviable success in exports and TDP's support of the proposed feasibility study will clearly maintain and very likely add to that momentum.

Shrivastava, V.K.; Sandell, D.H.

1992-06-01T23:59:59.000Z

366

Eastern Interconnection Planning Collaborative News Release  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a...

367

Western Baldwin County, AL Grid Interconnection Project  

SciTech Connect

The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

Thomas DeBell

2011-09-30T23:59:59.000Z

368

Interconnection Standards Guide Integration of Distributed Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources Across the United States, energy circles are buzzing about the promise of the smart grid-the digital electric power system that holds the potential to reduce greenhouse...

369

Memory test time reduction by interconnecting test items  

Science Conference Proceedings (OSTI)

The idea is to interconnect test items to reuse memory states left from the previous test item for saving initialization and verification sequences. Meanwhile, signal settling time of the tester between two consecutive test items being applied can also ... Keywords: NP-hard problem, constraints, graph theory, initialization sequences, integer linear programming model, integer programming, integrated circuit testing, integrated memory circuits, interconnection problem, iterations, linear programming, memory test time reduction, rural Chinese postman problem, signal settling time, successive ILP models, test items interconnection, verification sequences

Wen-Jer Wu; Chuan Yi Tang

2000-12-01T23:59:59.000Z

370

Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint  

DOE Green Energy (OSTI)

During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the Western Interconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of the EIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

Milligan, M.; Kirby, B.; King, J.; Beuning, S.

2011-07-01T23:59:59.000Z

371

Energy Efficiency is always a Good Business Decision, especially...  

NLE Websites -- All DOE Office Websites (Extended Search)

publication of the National Electrical Manufacturers Association (NEMA), February 2009 Energy Efficiency is a Good Business Decision, Especially Now By Neil Zobler, Catalyst...

372

Decision Applications: D, Decision Applications: LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

Decision Applications Division Systems Engineering and Integration, D-3 Energy and Infrastructure Analysis, D-4 Nuclear Design and Risk Analysis, D-5 Risk Analysis and Decision...

373

PARS II New Contractor Information for Interconnection Security Agreement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

374

Webinar: Understanding the Interconnection and Transmission Service Queues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

375

Advanced Unit Commitment Strategies in the United States Eastern Interconnection  

DOE Green Energy (OSTI)

This project sought to evaluate the impacts of high wind penetrations on the U.S. Eastern Interconnection and analyze how different unit commitment strategies may affect these impacts.

Meibom, P.; Larsen, H. V.; Barth, R.; Brand, H.; Tuohy, A.; Ela, E.

2011-08-01T23:59:59.000Z

376

Interconnect scaling into the sub-10nm regime  

Science Conference Proceedings (OSTI)

Scaling of conventional interconnects faces two major challenges: increased effective copper resistivity at nano-scale linewidth, and degraded copper wire reliability at higher current density. Analysis shows that when the linewidth of Cu wire scales ...

Xiangyu Chen; Jiale Liang; H.-S. Philip Wong

2012-06-01T23:59:59.000Z

377

Microbenchmark Performance Comparison of High-Speed Cluster Interconnects  

Science Conference Proceedings (OSTI)

High-speed cluster interconnects Myrinet, Quadrics, and InfiniBand achieve low latency and high bandwidth with low host overhead. However, they show quite different performance behaviors when handling communication buffer reuse patterns.

Jiuxing Liu; Balasubramanian Chandrasekaran; Weikuan Yu; Jiesheng Wu; Darius Buntinas; Sushmitha Kini; Dhabaleswar K. Panda; Pete Wyckoff

2004-01-01T23:59:59.000Z

378

The feasibility of on-chip interconnection using antennas  

Science Conference Proceedings (OSTI)

The feasibility of integrating antennas and required circuits to form wireless interconnects in foundry digital CMOS technologies has been demonstrated. The key challenges including the effects of metal structures associated with integrated circuits, ...

K. K. O; K. Kim; B. Floyd; J. Mehta; H. Yoon; C.-M. Hung; D. Bravo; T. Dickson; X. Guo; R. Li; N. Trichy; J. Caserta; W. Bomstad; J. Branch; D.-J. Yang; J. Bohorquez; J. Chen; E.-Y. Seok; L. Gao; A. Sugavanam; J.-J. Lin; S. Yu; C. Cao; M.-H. Hwang; Y.-R. Ding; S.-H. Hwang; H. Wu; N. Zhang; J. E. Brewer

2005-05-01T23:59:59.000Z

379

Nanoantenna couplers for metal-insulator-metal waveguide interconnects  

E-Print Network (OSTI)

State-of-the-art copper interconnects suffer from increasing spatial power dissipation due to chip downscaling and RC delays reducing operation bandwidth. Wide bandwidth, minimized Ohmic loss, deep sub-wavelength confinement ...

Onbasli, Mehmet Cengiz

380

Field solver technologies for variation-aware interconnect parasitic extraction  

E-Print Network (OSTI)

Advances in integrated circuit manufacturing technologies have enabled high density onchip integration by constantly scaling down the device and interconnect feature size. As a consequence of the ongoing technology scaling ...

El-Moselhy, Tarek Ali

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Microsoft Word - Poster Abstract_2010_PNNL_Steel Interconnect...  

NLE Websites -- All DOE Office Websites (Extended Search)

2: Dual Interconnect Coatings for Planar SOFC Stacks Jung Pyung Choi, Jeffry W. Stevenson, K. Scott Weil, Yeong-Shyung Chou, Z. Gary Yang, and Gordon Xia Ferritic stainless steel...

382

8th Annual TMS Lead Free Solder and Interconnect Technology ...  

Science Conference Proceedings (OSTI)

8th Annual TMS Lead Free Solder and Interconnect. Technology Workshop. Sunday, March 11, 2012 9:00 a.m. 4:30 p.m.. Member fee: $15. Nonmember fee:...

383

Energy scalability of on-chip interconnection networks  

E-Print Network (OSTI)

On-chip interconnection networks (OCN) such as point-to-point networks and buses form the communication backbone in multiprocessor systems-on-a-chip, multicore processors, and tiled processors. OCNs consume significant ...

Konstantakopoulos, Theodoros K., 1977-

2007-01-01T23:59:59.000Z

384

Interconnect modeling and optimization in deep sub-micron technologies  

E-Print Network (OSTI)

Interconnect will be a major bottleneck for deep sub-micron technologies in the years to come. This dissertation addresses the communication aspect from a power consumption and transmission speed perspective. A model for ...

Sotiriadis, Paul Peter P. (Paul Peter Peter-Paul), 1973-

2002-01-01T23:59:59.000Z

385

Interconnecting PV on New York City's Secondary Network Distribution System  

DOE Green Energy (OSTI)

This study describes technical assistance provided by NREL to help New York City and Con Edison improve the interconnection of distributed PV systems on a secondary network distribution system.

Anderson, K.; Coddington, M.; Burman, K.; Hayter, S.; Kroposki, B.; Watson, A.

2009-12-01T23:59:59.000Z

386

EA-1902: Northern Wind Interconnection Project, Summit, South Dakota  

Energy.gov (U.S. Department of Energy (DOE))

DOEs Western Area Power Administration is preparing this EA to evaluate the environmental impacts of the interconnection of the proposed Northern Wind Project in Summit, South Dakota.

387

Evaluation of phase change materials for reconfigurable interconnects  

E-Print Network (OSTI)

The possible use of programmable integrated circuit interconnect vias using an indirectly heated phase change material is evaluated. Process development and materials investigations are examined. Devices capable of multiple ...

Khoo, Chee Ying

2010-01-01T23:59:59.000Z

388

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

389

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid  

SciTech Connect

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

Kou, Gefei [ORNL] [ORNL; Hadley, Stanton W [ORNL] [ORNL; Markham, Penn N [ORNL] [ORNL; Liu, Yilu [ORNL] [ORNL

2013-12-01T23:59:59.000Z

390

InGaAs monolithic interconnected modules (MIM)  

DOE Green Energy (OSTI)

A monolithic interconnected module (MIM) structure has been developed for thermophotovoltaic (TPV) applications. The MIM device consists of many individual InGaAs cells series-connected on a single semi-insulating (S.I.) InP substrate. An infrared (IR) back surface reflector (BSR), placed on the rear surface of the substrate, returns the unused portion of the TPV radiator output spectrum back to the emitter for recycling, thereby providing for high system efficiencies. Also, the use of a BSR obviates the need to use a separate filtering element. As a result, MIMs are exposed to the entire emitter output, thereby maximizing output power density. MIMs with an active area of 1 x 1-cm were comprised of 15 cells monolithically connected in series. Both lattice-matched and lattice-mismatched InGaAs/InP devices were produced, with bandgaps of 0.74 and 0.55 eV, respectively. The 0.74-eV modules demonstrated an open-circuit voltage (Voc) of 6.158 V and a fill factor of 74.2% at a short-circuit current (Jsc) of 842 mA/cm{sup 2}, under flashlamp testing. The 0.55-eV modules demonstrated a Voc of 4.849 V and a fill factor of 57.8% at a Jsc of 3.87 A/cm{sup 2}. IR reflectance measurements (i.e., {lambda} > 2 {micro}m) of these devices indicated a reflectivity of {ge} 83%. Latest electrical and optical performance results for the MIMs will be presented.

Fatemi, N.S.; Jenkins, P.P.; Weizer, V.G.; Hoffman, R.W. Jr. [Essential Research, Inc., Cleveland, OH (United States); Wilt, D.M.; Scheiman, D.; Brinker, D. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Murray, C.S.; Riley, D. [Westinghouse Electric Corp., West Mifflin, PA (United States)

1997-12-31T23:59:59.000Z

391

Exploration of Resource and Transmission Expansion Decisions in  

E-Print Network (OSTI)

coordination among renewable developers, utilities and transmission owners, resource and transmission planners for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed Coordinating Council WEIL Western Electric Industry Leaders WGA Western Governors Association WREZ Western

392

Electrical engineering Electricity  

E-Print Network (OSTI)

generation Transmission Distribution · Electrical generators · Electric motors · High voltage engineering associated with the systems Electrical engineering · Electric power generation Transmission Distribution The electricity transported to load locations from a power station transmission subsystem The transmission system

?nay, Devrim

393

Method of forming a plasma sprayed interconnection layer on an electrode of an electrochemical cell  

DOE Patents (OSTI)

A dense, substantially gas-tight, electrically conductive interconnection layer is formed on an air electrode structure of an electrochemical cell by (A) providing an electrode surface; (B) forming on a selected portion of the electrode surface, a layer of doped LaCrO{sub 3} particles doped with an element selected from Ca, Sr, Ba, Mg, Co, Ni, Al and mixtures thereof by plasma spraying doped LaCrO{sub 3} powder, preferably compensated with chromium as Cr{sub 2}O{sub 3} and/or dopant element, preferably by plasma arc spraying; and, (C) heating the doped and compensated LaCrO{sub 3} layer to about 1100 C to 1300 C to provide a dense, substantially gas-tight, substantially hydration-free, electrically conductive interconnection material bonded to the electrode surface. A solid electrolyte layer can be applied to the unselected portion of the air electrode, and a fuel electrode can be applied to the solid electrolyte, to provide an electrochemical cell. 6 figs.

Spengler, C.J.; Folser, G.R.; Vora, S.D.; Kuo, L.; Richards, V.L.

1995-06-20T23:59:59.000Z

394

Method of forming a plasma sprayed interconnection layer on an electrode of an electrochemical cell  

DOE Patents (OSTI)

A dense, substantially gas-tight, electrically conductive interconnection layer is formed on an air electrode structure of an electrochemical cell by (A) providing an electrode surface; (B) forming on a selected portion of the electrode surface, a layer of doped LaCrO.sub.3 particles doped with an element selected from Ca, Sr, Ba, Mg, Co, Ni, Al and mixtures thereof by plasma spraying doped LaCrO.sub.3 powder, preferably compensated with chromium as Cr.sub.2 O.sub.3 and/or dopant element, preferably by plasma arc spraying; and, (C) heating the doped and compensated LaCrO.sub.3 layer to about 1100.degree. C. to 1300.degree. C. to provide a dense, substantially gas-tight, substantially hydration-free, electrically conductive interconnection material bonded to the electrode surface. A solid electrolyte layer can be applied to the unselected portion of the air electrode, and a fuel electrode can be applied to the solid electrolyte, to provide an electrochemical cell.

Spengler, Charles J. (Murrysville, PA); Folser, George R. (Lower Burrell, PA); Vora, Shailesh D. (Monroeville, PA); Kuo, Lewis (Monroeville, PA); Richards, Von L. (Anyola, IN)

1995-01-01T23:59:59.000Z

395

Tailoring Fe-Base Alloys for Intermediate Temperature SOFC Interconnect Application  

DOE Green Energy (OSTI)

This report summarized the research efforts and major conclusions for our SECA Phase I and II project focused on Cr-free or low Cr Fe-Ni based alloy development for intermediate temperature solid oxide fuel cell (SOFC) interconnect application. Electrical conductivity measurement on bulk (Fe,Ni){sub 3}O{sub 4} coupons indicated that this spinel phase possessed a higher electrical conductivity than Cr{sub 1.5}Mn{sub 1.5}O{sub 4} spinel and Cr{sub 2}O{sub 3}, which was consistent with the low area specific resistance (ASR) of the oxide scale formed on these Fe-Ni based alloys. For Cr-free Fe-Ni binary alloys, although the increase in Ni content in the alloys improved the oxidation resistance, and the Fe-Ni binary alloys exhibited adequate CTE and oxide scale ASR, their oxidation resistance needs to be further improved. Systematic alloy design efforts have led to the identification of one low-Cr (6wt.%) Fe-Ni-Co based alloy which formed a protective, electrically-conductive Cr{sub 2}O{sub 3} inner layer underneath a Cr-free, highly conductive spinel outer layer. This low-Cr, Fe-Ni-Co alloy has demonstrated a good CTE match with other cell components; high oxidation resistance comparable to that of Crofer; low oxide scale ASR with the formation of electrically-insulating phases in the oxide scale; no scale spallation during thermal cycling; adequate compatibility with cathode materials; and comparable mechanical properties with Crofer. The existence of the Cr-free (Fe,Co,Ni){sub 3}O{sub 4} outer layer effectively reduced the Cr evaporation and in transpiration testing resulted in a 6-fold decrease in Cr evaporation as compared to a state-of-the-art ferritic interconnect alloy. In-cell testing using an anode supported cell with a configuration of Alloy/Pt/LSM/YSZ/Ni+YSZ indicates that the formation of the Cr-free spinel layer via thermal oxidation was effective in blocking the Cr migration and thus improving the cell performance stability. Electroplating of the Fe-Ni-Co alloys as precursor to synthesize a protective spinel layer on commercial ferritic steels has been initiated to facilitate the utilization of the Cr-free spinel as a surface seal to block Cr evaporation. It is suggested that low-cost Fe-Ni-Co alloy coating on commercial ferritic steels might be the best approach to completely eliminate the Cr poisoning problem in SOFC stacks, while maintaining the relatively low overall cost of the interconnect component.

J.H. Zhu; M.P. Brady; H.U. Anderson

2007-12-31T23:59:59.000Z

396

Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrodeposited Electrodeposited Mn-Co Alloy Coating For SOFC Interconnects H. McCrabb * , T. Hall * , J. Wu # , H. Zhang # , X. Liu # , E.J. Taylor * * Faraday Technology Inc., 315 Huls Dr., Clayton, OH 45315, USA # West Virginia University, Dept. of Mechanical and Aerospace Eng.ESB, Morgantown, WV, 26506, USA Overall Objective Overall Objective Principal Investigator: Heather McCrabb, Company Name: Faraday Technology, Inc., Address: 315 Huls Drive, Clayton, OH 45315, Phone: 937-836-7749, E-mail: heathermccrabb@faradaytechnology.com, Company website: faradaytechnology.com Previous Work at WVU Results Develop an inexpensive manufacturing process for depositing (Mn,Co) 3 O 4 spinel coatings onto SOFC interconnects. Introduction The decrease in the SOFC operating temperatures from 1000°C to between 650 and 850°C has enabled the use of chromia-forming ferritic stainless steels as interconnects

397

Renewable Energy Interconnection and Storage - Technical Aspects | Open  

Open Energy Info (EERE)

Renewable Energy Interconnection and Storage - Technical Aspects Renewable Energy Interconnection and Storage - Technical Aspects Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Spain Installed Wind Capacity Website Focus Area: Renewable Energy Topics: Market Analysis Website: www.gwec.net/index.php?id=131 Equivalent URI: cleanenergysolutions.org/content/spain-installed-wind-capacity-website Language: English Policies: Regulations Regulations: Feed-in Tariffs This website presents an overview of total installed wind energy capacity in Spain per year from 2000 to 2010. The page also presents the main market developments from 2010; a policy summary; a discussion of the revision in feed-in tariffs in 2010; and a future market outlook. References Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Interconnection_and_Storage_-_Technical_Aspects&oldid=514543"

398

Net Metering and Interconnection Procedures-- Incorporating Best Practices  

SciTech Connect

State utility commissions and utilities themselves are actively developing and revising their procedures for the interconnection and net metering of distributed generation. However, the procedures most often used by regulators and utilities as models have not been updated in the past three years, in which time most of the distributed solar facilities in the United States have been installed. In that period, the Interstate Renewable Energy Council (IREC) has been a participant in more than thirty state utility commission rulemakings regarding interconnection and net metering of distributed generation. With the knowledge gained from this experience, IREC has updated its model procedures to incorporate current best practices. This paper presents the most significant changes made to IREC???¢????????s model interconnection and net metering procedures.

Jason Keyes, Kevin Fox, Joseph Wiedman, Staff at North Carolina Solar Center

2009-04-01T23:59:59.000Z

399

EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34: Hualapai Valley Solar Interconnection Project, Arizona 34: Hualapai Valley Solar Interconnection Project, Arizona EIS-0434: Hualapai Valley Solar Interconnection Project, Arizona Overview Hualapai Valley Solar, LLC, proposes to construct, operate and maintain a 340-megawatt, solar-powered generating facility in Mohave County, near Kingman, Ariz. The proposed project would use concentrating solar-power-trough technology to capture the sun's heat to make steam, which would power a traditional steam turbine generator. Proposed infrastructure would consist of a solar field, power block, thermal energy storage system, substation site, transmission line, temporary laydown areas and other ancillary facilities. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

400

Decision Superiority Process Model  

Science Conference Proceedings (OSTI)

Decision superiority is achieved not just by acquiring and assessing the right information, but by translating it into actionable knowledge that can be exploited in the decision making process. Achieving decision superiority is necessary, because the ... Keywords: context-goal alternatives, decision making process, decision superiority, process model

Barbara Sorensen; Azad M. Madni; Carla C. Madni

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Record of Decision (ROD) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 18, 2011 August 18, 2011 EIS-0240: Amended Record of Decision Disposition of Surplus Highly Enriched Uranium July 20, 2011 EIS-0387: Record of Decision Y-12 National Security Complex July 8, 2011 EIS-0380: Amended Record of Decision Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico April 18, 2011 EIS-0416: Record of Decision Issuance of Loan Guarantees to Solar Partners I, LLC, Solar Partners II, LLC, and Solar Partners VIII, LLC, for Ivanpah Solar Electric Generating System Units 1, 2, 3 March 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas November 29, 2010

402

An electrical-level superposed-edge approach to statistical serial link simulation  

Science Conference Proceedings (OSTI)

Brute-force simulation approaches to estimating serial-link bit-error rates (BERs) become computationally intractable for the case when BERs are low and the interconnect electrical response is slow enough to generate intersymbol interference that spans ... Keywords: bit-error rate, circuit simulation, eye diagrams, interconnect, serial link

Michael Tsuk; Daniel Dvorscak; Chin Siong Ong; Jacob White

2009-11-01T23:59:59.000Z

403

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two 230 kV circuits from the Palmers Comer to Potomac River substations pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

404

Corrosion Performance of Ferritic Steel for SOFC Interconnect Applications  

DOE Green Energy (OSTI)

Ferritic stainless steels have been identified as potential candidates for interconnects in planar-type solid oxide fuel cells (SOFC) operating below 800C. Crofer 22 APU was selected for this study. It was studied under simulated SOFC-interconnect dual environment conditions with humidified air on one side of the sample and humidified hydrogen on the other side at 750C. The surfaces of the oxidized samples were studied by scanning electron microscopy (SEM) equipped with microanalytical capabilities. X-ray diffraction (XRD) analysis was also used in this study.

Ziomek-Moroz, M.; Holcomb, G.R.; Covino, B.S., Jr.; Bullard, S.J.; Jablonski, P.D.; Alman, D.E.

2006-11-01T23:59:59.000Z

405

Effects of composition on sintering of current interconnects in SOFC  

DOE Green Energy (OSTI)

The sintering behavior of alkaline-earth-substituted lanthanum and yttrium chromites, which are candidates for the current interconnect in solid oxide fuel cells (SOFC) was investigated. Extensive commercialization of SOFC technology may involve co-sintering as a method to reduce production costs. Co-sintering will require that the interconnect material reaches high density (closed porosity) under conditions in which the air-electrode material, a manganite, maintains substantial porosity and remains stable. Therefore, ideal chromite compositions are those that attain greater than 94% of theoretical density in high PO{sub 2} atmosphere at temperatures near or below 1400{degree}C.

Chick, L.A.; Bates, J.L.

1992-11-01T23:59:59.000Z

406

Effects of composition on sintering of current interconnects in SOFC  

DOE Green Energy (OSTI)

The sintering behavior of alkaline-earth-substituted lanthanum and yttrium chromites, which are candidates for the current interconnect in solid oxide fuel cells (SOFC) was investigated. Extensive commercialization of SOFC technology may involve co-sintering as a method to reduce production costs. Co-sintering will require that the interconnect material reaches high density (closed porosity) under conditions in which the air-electrode material, a manganite, maintains substantial porosity and remains stable. Therefore, ideal chromite compositions are those that attain greater than 94% of theoretical density in high PO[sub 2] atmosphere at temperatures near or below 1400[degree]C.

Chick, L.A.; Bates, J.L.

1992-11-01T23:59:59.000Z

407

Trinity Public Utilities District Direct Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement DOE/EIS-0395 JULY 2007 COVER SHEET LEAD FEDERAL AGENCIES: U.S. Department of Energy (DOE), Western Area Power Administration (Western), and Office of Electricity Delivery and Energy Reliability (OE) COOPERATING AGENCIES: U.S. Department of the Navy (Navy), U.S. Bureau of Reclamation (Reclamation), U.S. Bureau of Land Management (BLM), City of Yuma TITLE: San Luis Rio Colorado Project Final Environmental Impact Statement, DOE/EIS-0395 LOCATION: Yuma County, Arizona CONTACT: For additional information on DOE National Environmental Policy Act (NEPA) activities, please contact Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance, GC-20, U.S. Department of Energy, 1000 Independence Avenue S.W., Washington D.C. 20585, phone: 1-800-472-2756 or visit the

408

Dan Klempel Basin Electric Power Cooperative DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dan Dan Klempel Basin Electric Power Cooperative DOE 2009 Congestion Study Workshop Oklahoma City, Oklahoma June 18, 2008 Page 1 of 5 Basin Electric Power Cooperative would like to thank the Department of Energy for this opportunity to share some of our thoughts on transmission congestion issues. Basin Electric is a wholesale power supplier to rural electric cooperatives located in the mid-west and in both the east and west interconnections. Naturally, our generation and transmission facilities also reside in both interconnections so we use asynchronous back-to-back DC facilities to balance loads with resources. With headquarters in Bismarck, North Dakota; we find ourselves in the heart of some of the nations most desirable wind patterns for potential renewable energy development as well as electric energy production from more traditional sources. Lignite coal has been a reliable

409

Investigation of AISI 441 Ferritic Stainless Steel and Development of Spinel Coatings for SOFC Interconnect Applications  

DOE Green Energy (OSTI)

As part of an effort to develop cost-effective ferritic stainless steel-based interconnects for solid oxide fuel cell (SOFC) stacks, both bare and spinel coated AISI 441 were studied in terms of metallurgical characteristics, oxidation behavior, and electrical performance. The conventional melt metallurgy used for the bulk alloy fabrication leads to significant processing cost reduction and the alloy chemistry with the presence of minor alloying additions of Nb and Ti facilitate the strengthening by precipitation and formation of Laves phase both inside grains and along grain boundaries during exposure in the intermediate SOFC operating temperature range. The Laves phase formed along the grain boundaries also ties up Si and prevents the formation of an insulating silica layer at the scale/metal interface during prolonged exposure. The substantial increase in ASR during long term oxidation due to oxide scale growth suggested the need for a conductive protection layer, which could also minimize Cr evaporation. In particular, Mn1.5Co1.5O4 based surface coatings on planar coupons drastically improved the electrical performance of the 441, yielding stable ASR values at 800C for over 5,000 hours. Ce-modified spinel coatings retained the advantages of the unmodified spinel coatings, and also appeared to alter the scale growth behavior beneath the coating, leading to a more adherent scale. The spinel protection layers appeared also to improve the surface stability of 441 against the anomalous oxidation that has been observed for ferritic stainless steels exposed to dual atmosphere conditions similar to SOFC interconnect environments. Hence, it is anticipated that, compared to unmodified spinel coatings, the Ce-modified coatings may lead to superior structural stability and electrical performance.

Yang, Zhenguo; Xia, Guanguang; Wang, Chong M.; Nie, Zimin; Templeton, Joshua D.; Singh, Prabhakar; Stevenson, Jeffry W.

2008-05-30T23:59:59.000Z

410

Producing thin film photovoltaic modules with high integrity interconnects and dual layer contacts  

DOE Patents (OSTI)

High performance photovoltaic modules are produced with improved interconnects by a special process. Advantageously, the photovoltaic modules have a dual layer back (rear) contact and a front contact with at least one layer. The front contact and the inner layer of the back contact can comprise a transparent conductive oxide. The outer layer of the back contact can comprise a metal or metal oxide. The front contact can also have a dielectric layer. In one form, the dual layer back contact comprises a zinc oxide inner layer and an aluminum outer layer and the front contact comprises a tin oxide inner layer and a silicon dioxide dielectric outer layer. One or more amorphous silicon-containing thin film semiconductors can be deposited between the front and back contacts. The contacts can be positioned between a substrate and an optional superstrate. During production, the transparent conductive oxide layer of the front contact is scribed by a laser, then the amorphous silicon-containing semiconductors and inner layer of the dual layer back contact are simultaneously scribed and trenched (drilled) by the laser and the trench is subsequently filled with the same metal as the outer layer of the dual layer back contact to provide a superb mechanical and electrical interconnect between the front contact and the outer layer of the dual layer back contact. The outer layer of the dual layer back contact can then be scribed by the laser. For enhanced environmental protection, the photovoltaic modules can be encapsulated.

Jansen, Kai W. (Lawrenceville, NJ); Maley, Nagi (Exton, PA)

2000-01-01T23:59:59.000Z

411

Producing thin film photovoltaic modules with high integrity interconnects and dual layer contacts  

DOE Patents (OSTI)

High performance photovoltaic modules are produced with improved interconnects by a special process. Advantageously, the photovoltaic modules have a dual layer back (rear) contact and a front contact with at least one layer. The front contact and the inner layer of the back contact can comprise a transparent conductive oxide. The outer layer of the back contact can comprise a metal or metal oxide. The front contact can also have a dielectric layer. In one form, the dual layer back contact comprises a zinc oxide inner layer and an aluminum outer layer and the front contact comprises a tin oxide inner layer and a silicon dioxide dielectric outer layer. One or more amorphous silicon-containing thin film semiconductors can be deposited between the front and back contacts. The contacts can be positioned between a substrate and an optional superstrate. During production, the transparent conductive oxide layer of the front contact is scribed by a laser, then the amorphous silicon-containing semiconductors and inner layer of the dual layer back contact are simultaneously scribed and trenched (drilled) by the laser and the trench is subsequently filled with the same metal as the outer layer of the dual layer back contact to provide a superb mechanical and electrical interconnect between the front contact and the outer layer of the dual layer back contact. The outer layer of the dual layer back contact can then be scribed by the laser. For enhanced environmental protection, the photovoltaic modules can be encapsulated.

Jansen, Kai W. (Lawrenceville, NJ); Maley, Nagi (Exton, PA)

2001-01-01T23:59:59.000Z

412

New Solutions for Substation Sensing, Signal Processing and Decision Making M. Kezunovic, Fellow IEEE  

E-Print Network (OSTI)

into one system [1]. Once the concept is implemented, a variety of new applications that utilize overall of IEDs from different vendors can be interconnected to form a substation automation system. The problem in the power system area regarding application of sensors, signal processing and decision-making. To illustrate

413

Optimization of energy and throughput for pipelined VLSI interconnect  

E-Print Network (OSTI)

for the degree Master of Science in Electrical Engineering (Clark Hamilton Master of Science in Electrical Engineering (

Hamilton, Kevin Clark

2010-01-01T23:59:59.000Z

414

Fundamental Studies of the Durability of Materials for Interconnects in Solid Oxide Fuel Cells  

DOE Green Energy (OSTI)

Ferritic stainless steels are a leading candidate material for use as an SOFC interconnect, but have the problem of forming volatile chromia species that lead to cathode poisoning. This project has focused both on optimization of ferritic alloys for SOFC applications and evaluating the possibility of using alternative materials. The initial efforts involved studying the oxidation behavior of a variety of chromia-forming ferritic stainless steels in the temperature range 700-900 C in atmospheres relevant to solid oxide fuel cell operation. The alloys exhibited a wide variety of oxidation behavior based on composition. A method for reducing the vaporization is to add alloying elements that lead to the formation of a thermally grown oxide layer over the protective chromia. Several commercial steels form manganese chromate on the surface. This same approach, combined with observations of TiO{sub 2} overlayer formation on the chromia forming, Ni-based superalloy IN 738, has resulted in the development of a series of Fe-22 Cr-X Ti alloys (X=0-4 wt%). Oxidation testing has indicated that this approach results in significant reduction in chromia evaporation. Unfortunately, the Ti also results in accelerated chromia scale growth. Fundamental thermo-mechanical aspects of the durability of solid oxide fuel cell (SOFC) interconnect alloys have also been investigated. A key failure mechanism for interconnects is the spallation of the chromia scale that forms on the alloy, as it is exposed to fuel cell environments. Indentation testing methods to measure the critical energy release rate (Gc) associated with the spallation of chromia scale/alloy systems have been evaluated. This approach has been used to evaluate the thermomechanical stability of chromia films as a function of oxidation exposure. The oxidation of pure nickel in SOFC environments was evaluated using thermogravimetric analysis (TGA) to determine the NiO scaling kinetics and a four-point probe was used to measure the area-specific resistance (ASR) to estimate the electrical degradation of the interconnect. In addition to the baseline study of pure nickel, steps were taken to decrease the ASR through alloying and surface modifications. Finally, high conductivity composite systems, consisting of nickel and silver, were studied. These systems utilize high conductivity silver pathways through nickel while maintaining the mechanical stability that a nickel matrix provides.

Frederick S. Pettit; Gerald H. Meier

2006-06-30T23:59:59.000Z

415

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: September 2011 Regional Wholesale Markets: September 2011 The United States. has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily price and demand data is shown for the month of September 2011 and for the year ending on September 30, 2011. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest (Palo Verde) and

416

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: March 2012 Regional Wholesale Markets: March 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the Nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

417

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: February 2012 Regional Wholesale Markets: February 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the Nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

418

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: November 2011 Regional Wholesale Markets: November 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

419

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: December 2011 Regional Wholesale Markets: December 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

420

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: January 2012 Regional Wholesale Markets: January 2012 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the nation. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Electricity Monthly Update  

Gasoline and Diesel Fuel Update (EIA)

Regional Wholesale Markets: October 2011 Regional Wholesale Markets: October 2011 The United States has many regional wholesale electricity markets. Below we look at monthly and annual ranges of on-peak, daily wholesale prices at selected pricing locations and daily peak demand for selected electricity systems in the U.S. The range of daily prices and demand data is shown for the report month and for the year ending with the report month. Prices and demand are shown for six Regional Transmission Operator (RTO) markets: ISO New England (ISO-NE), New York ISO (NYISO), PJM Interconnection (PJM), Midwest ISO (MISO), Electric Reliability Council of Texas (ERCOT), and two locations in the California ISO (CAISO). Also shown are wholesale prices at trading hubs in Louisiana (into Entergy), Southwest

422

Interconnecting Smart Objects with IP: The Next Internet  

Science Conference Proceedings (OSTI)

Smart object technology, sometimes called the Internet of Things, is having a profound impact on our day-to-day lives. Interconnecting Smart Objects with IP is the first book that takes a holistic approach to the revolutionary area of IP-based ...

Jean-Philippe Vasseur; Adam Dunkels

2010-06-01T23:59:59.000Z

423

Synapse: a scalable protocol for interconnecting heterogeneous overlay networks  

Science Conference Proceedings (OSTI)

This paper presents Synapse, a scalable protocol for information retrieval over the inter-connection of heterogeneous overlay networks. Applications on top of Synapse see those intra-overlay networks as a unique inter-overlay network. Scalability in ... Keywords: information retrieval, overlay networks, peer-to-peer

Luigi Liquori; Cdric Tedeschi; Laurent Vanni; Francesco Bongiovanni; Vincenzo Ciancaglini; Bojan Marinkovi?

2010-05-01T23:59:59.000Z

424

Imprint lithography enabling ultra-low loss coaxial interconnects  

Science Conference Proceedings (OSTI)

Processing techniques have been demonstrated to fabricate a novel structure with smooth transitions, metallic shielding, and encapsulated air dielectric layers using sacrificial polymers and the three-dimensional patterning capabilities of imprint lithography. ... Keywords: Air dielectrics, Imprint lithography, Interconnects, Sacrificial polymers

Venmathy Rajarathinam; Nathan Fritz; Sue Ann Bidstrup Allen; Paul A. Kohl

2011-03-01T23:59:59.000Z

425

Designing Scalable PGAS Communication Subsystems on Cray Gemini Interconnect  

Science Conference Proceedings (OSTI)

The Cray Gemini Interconnect has been recently introduced as a next generation network architecture for building multi-petaflop supercomputers. Cray XE6 systems including LANL Cielo, NERSC Hopper, ORNL Titan and proposed NCSA BlueWaters leverage the Gemini Interconnect as their primary Interconnection network. At the same time, programming models such as the Message Passing Interface (MPI) and Partitioned Global Address Space (PGAS) models such as Unified Parallel C (UPC) and Co-Array Fortran (CAF) have become available on these systems. Global Arrays is a popular PGAS model used in a variety of application domains including hydrodynamics, chemistry and visualization. Global Arrays uses Aggregate Re- mote Memory Copy Interface (ARMCI) as the communication runtime system for Remote Memory Access communication. This paper presents a design, implementation and performance evaluation of scalable and high performance communication subsystems on Cray Gemini Interconnect using ARMCI. The design space is explored and time-space complexities of commu- nication protocols for one-sided communication primitives such as contiguous and uniformly non-contiguous datatypes, atomic memory operations (AMOs) and memory synchronization is presented. An implementation of the proposed design (referred as ARMCI-Gemini) demonstrates the efficacy on communication primitives, application kernels such as LU decomposition and full applications such as Smooth Particle Hydrodynamics (SPH) application.

Vishnu, Abhinav; Daily, Jeffrey A.; Palmer, Bruce J.

2012-12-26T23:59:59.000Z

426

Modeling magnetic coupling for on-chip interconnect  

Science Conference Proceedings (OSTI)

As advances in IC technologies and operat-ing frequencies make the modeling of on-chip magnetic interactions a necessity, it is apparent that extension of traditional inductance extraction approaches to full-chip scale problems is impractical. There ... Keywords: inductance, interconnect modeling, magnetic interaction, susceptance

Michael W. Beattie; Lawrence T. Pileggi

2001-06-01T23:59:59.000Z

427

Microsoft PowerPoint - Interconnect Development at PNNL.ppt ...  

NLE Websites -- All DOE Office Websites (Extended Search)

l t f SOFC I t t Development of SOFC Interconnects and Coatings J.W. Stevenson, G.G. Xia, J.P. Choi, J.D. Templeton, X. Li, T.K. Oh, and Z. Nie Pacific Northwest National...

428

Interconnect agnostic checkpoint/restart in open MPI  

Science Conference Proceedings (OSTI)

Long running High Performance Computing (HPC) applications at scale must be able to tolerate inevitable faults if they are to harness current and future HPC systems. Message Passing Interface (MPI) level transparent checkpoint/restart fault tolerance ... Keywords: MPI, checkpoint coordination protocol, checkpoint/restart, fault tolerance, high speed interconnect, infiniband, myrinet, rollback-recovery, shared memory

Joshua Hursey; Timothy I. Mattox; Andrew Lumsdaine

2009-06-01T23:59:59.000Z

429

Computational simulation of electromigration induced damage in copper interconnects  

Science Conference Proceedings (OSTI)

Current density levels are expected to increase by orders of magnitude in next generation power electronics and nanoelectronics. Electromigration which occur under high current density is the major concern for the nanoelectronics industry. Using a general ... Keywords: copper interconnects, damage mechanics, electromigration, electronics packaging reliability, thin film

Cemal Basaran; Minghui Lin; Shidong Li

2007-07-01T23:59:59.000Z

430

System level performance analysis of carbon nanotube global interconnects for emerging chip multiprocessors  

Science Conference Proceedings (OSTI)

Although carbon nanotubes (CNTs) have been widely proposed as interconnect fabrics for future ultra deep submicron (UDSM) technologies, there is a lack of system-level performance analysis using these interconnects. In this paper, we investigate the ...

Sudeep Pasricha; Fadi Kurdahi; Nikil Dutt

2008-06-01T23:59:59.000Z

431

Preliminary Response of PJM Interconnection, L.L.C. to the Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant Potomac River, LLC Preliminary Response of PJM Interconnection, L.L.C. to the Operating Plan of Mirant...

432

Tubular solid oxide fuel cells with porous metal supports and ceramic interconnections  

DOE Patents (OSTI)

An intermediate temperature solid oxide fuel cell structure capable of operating at from 600.degree. C. to 800.degree. C. having a very thin porous hollow elongated metallic support tube having a thickness from 0.10 mm to 1.0 mm, preferably 0.10 mm to 0.35 mm, a porosity of from 25 vol. % to 50 vol. % and a tensile strength from 700 GPa to 900 GPa, which metallic tube supports a reduced thickness air electrode having a thickness from 0.010 mm to 0.2 mm, a solid oxide electrolyte, a cermet fuel electrode, a ceramic interconnection and an electrically conductive cell to cell contact layer.

Huang, Kevin (Export, PA); Ruka, Roswell J. (Pittsburgh, PA)

2012-05-08T23:59:59.000Z

433

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013  

Energy.gov (U.S. Department of Energy (DOE))

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

434

Topic A" Awardee: Western Electricity Coordinating Council | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A" Awardee: Western Electricity Coordinating A" Awardee: Western Electricity Coordinating Council Topic A" Awardee: Western Electricity Coordinating Council Regional Transmission Expansion Planning (RTEP) The America Recovery and Reinvestment Act (ARRA) directs the Department of Energy (DOE) to provide assistance for the development of interconnection-based transmission plans for the Eastern and Western Interconnections, and for ERCOT. WECC received notification from the U.S. Department of Energy (DOE) on December 18, 2009 that it has been awarded $14.5 million in funding from the ARRA to conduct interconnection-wide electric transmission planning studies in the Western Interconnection. The funding allows WECC to significantly expand existing regional transmission planning activities and broaden stakeholder involvement in

435

Evaluating the energy consumption and the silicon area of on-chip interconnect architectures  

Science Conference Proceedings (OSTI)

Sophisticated on-chip interconnects using packet and circuit switching techniques were recently proposed as a solution to non-scalable shared-bus schemes currently used in Systems-on-Chip (SoCs) implementation. Different interconnect architectures have ... Keywords: Energy consumption and area requirements, Load and traffic models, On-chip interconnects, Simulation and evaluation, System-on-Chip

Mohamed Bakhouya

2009-07-01T23:59:59.000Z

436

PJM Interconnection, LLC Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

LLC Smart Grid Project LLC Smart Grid Project Jump to: navigation, search Project Lead PJM Interconnection, LLC Country United States Headquarters Location Norristown, Pennsylvania Additional Benefit Places Illinois, Indiana, Kentucky, Maryland, Michigan, North Carolina, New Jersey, Ohio, Pennsylvania, Virgin Islands, West Virginia Recovery Act Funding $13,698,091.00 Total Project Value $228203511 Coverage Area Coverage Map: PJM Interconnection, LLC Smart Grid Project Coordinates 40.121497°, -75.3399048° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

437

Geothermal Power and Interconnection: The Economics of Getting to Market  

NLE Websites -- All DOE Office Websites (Extended Search)

Power and Power and Interconnection: The Economics of Getting to Market David Hurlbut Technical Report NREL/TP-6A20-54192 April 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 Technical Report NREL/TP-6A20-54192 April 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

438

Impact of High Solar Penetration in the Western Interconnection  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of High Solar Penetration Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Technical Report NREL/TP-5500-49667 December 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Impact of High Solar Penetration in the Western Interconnection Debra Lew National Renewable Energy Laboratory Nicholas Miller, Kara Clark, Gary Jordan, and Zhi Gao GE Energy Prepared under Task No. SM101610

439

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

440

Backside localization of open and shorted IC interconnections  

SciTech Connect

A new failure analysis technique has been developed for backside and frontside localization of open and shorted interconnections on ICs. This scanning optical microscopy technique takes advantage of the interactions between IC defects and localized heating using a focused infrared laser ({lambda} = 1,340 nm). Images are produced by monitoring the voltage changes across a constant current supply used to power the IC as the laser beam is scanned across the sample. The method utilizes the Seebeck Effect to localize open interconnections and Thermally-Induced Voltage Alteration (TIVA) to detects shorts. The interaction physics describing the signal generation process and several examples demonstrating the localization of opens and shorts are described. Operational guidelines and limitations are also discussed.

Cole, E.I. Jr.; Tangyunyong, P.; Barton, D.L.

1998-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

SOFC Interconnect and Compressive Seal Development at PNNL  

Science Conference Proceedings (OSTI)

The development of solid oxide fuel cell (SOFC) technology represents an opportunity to achieve significant improvements in energy conversion efficiency and reduction of undesirable emissions. However, many technical challenges still need to be overcome before the utilization of the advantages of SOFC can take place. These challenges include the need for improved interconnects and seals for planar SOFC stacks. In this paper, we briefly summarize recent progress at PNNL in these two research areas.

Chou, Y S.; Yang, Z Gary; Singh, Prabhakar; Stevenson, Jeffry W.; Xia, Gordon

2005-11-01T23:59:59.000Z

442

EIS-0183: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summit/Westward Project, Clatskanie, Summit/Westward Project, Clatskanie, Oregon The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the

443

EIS-0439: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

9: Record of Decision 9: Record of Decision EIS-0439: Record of Decision Rice Solar Energy Project, Riverside County, CA For more information, contact: Ms. Liana Reilly Environmental Project Manager Corporate Services Office Western Area Power Administration A7400, P.O. Box 281213 Lakewood, CO 80228 Telephone:(720) 962-7253 Fax: (720) 962-7263 E-mail: reilly@wapa.gov Western Area Power Administration (Western) received a request from Rice Solar Energy, LLC (RSE) to interconnect its proposed Rice Solar Energy Project (Project) to Western's Parker-Blythe No. 2 Transmission Line. The Project would be located in eastern Riverside County, California, near State Route 62, approximately 40 miles northwest of Blythe, California, and 15 miles west of Vidal Junction, California. On June 10, 2011, the Notice

444

EIS-0197: Record of Decision (November 1996) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: Record of Decision (November 1996) 97: Record of Decision (November 1996) EIS-0197: Record of Decision (November 1996) Delivery of the Canadian Entitlement The United States Entity (the Administrator of the Bonneville Power Administration [BPA] and the Division Engineer, North Pacific Division of the US Army Corps of Engineers [Corps]) has decided to fulfill its obligation under the Columbia River Treaty (Treaty) between the United States of America (United States) and Canada by delivering Canada's Entitlement under the Treaty to points on the border between Canada and the United States near Blaine, Washington and Nelway, British Columbia (BC). Delivering the full Entitlement at existing interconnections at those locations will require no new transmission facilities in the United States

445

High Performance Ceramic Interconnect Material for Solid Oxide Fuel Cells (SOFCs): Ca- and Transition Metal-doped Yttrium Chromite  

Science Conference Proceedings (OSTI)

The effect of transition metal substitution on thermal and electrical properties of Ca-doped yttrium chromite was investigated in relation to use as a ceramic interconnect in high temperature solid oxide fuel cells (SOFCs). 10 at% Co, 4 at% Ni, and 1 at% Cu substitution on B-site of 20 at% Ca-doped yttrium chromite led to a close match of thermal expansion coefficient (TEC) with that of 8 mol% yttria-stabilized zirconia (YSZ), and a single phase Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 remained stable between 25 and 1100 degree C over a wide oxygen partial pressure range. Doping with Cu significantly facilitated densification of yttrium chromite. Ni dopant improved both electrical conductivity and dimensional stability in reducing environments, likely through diminishing the oxygen vacancy formation. Substitution with Co substantially enhanced electrical conductivity in oxidizing atmosphere, which was attributed to an increase in charge carrier density and hopping mobility. Electrical conductivity of Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 at 900 degree C is 57 S/cm in air and 11 S/cm in fuel (pO2=510^-17 atm) environments. Chemical compatibility of doped yttrium chromite with other cell components was verified at the processing temperatures. Based on the chemical and dimensional stability, sinterability, and thermal and electrical properties, Y0.8Ca0.2Cr0.85Co0.1Ni0.04Cu0.01O3 is suggested as a promising SOFC ceramic interconnect to potentially overcome technical limitations of conventional acceptor-doped lanthanum chromites.

Yoon, Kyung J.; Stevenson, Jeffry W.; Marina, Olga A.

2011-10-15T23:59:59.000Z

446

Notice of Availability of the Hopkins Ridge Wind Interconnection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the...

447

Geospatial Decision Making System  

The INL has developed a geospatial decision making process to assist agricultural producers in optimizing operating conditions of combine harvesters ...

448

NREL: Electric Infrastructure Systems Research - Distributed Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Distributed Energy Resources Test Facility Distributed Energy Resources Test Facility NREL's Distributed Energy Resources Test Facility (DERTF) is a working laboratory for interconnection and systems integration testing. This state-of-the-art facility includes generation, storage, and interconnection technologies as well as electric power system equipment capable of simulating a real-world electric system. Photo of the Distributed Energy Resources Test Facility and an adjacent solar photovoltaic array. The Distributed Energy Resources Test Facility is located at the National Wind Technology Center near Boulder, Colorado. Take a virtual tour of the DERTF. Researchers at the facility can vary equipment configurations and introduce common electrical disturbances such as sags, swells, and harmonic issues on

449

A new method for electric utility resource planning  

Science Conference Proceedings (OSTI)

This paper presents an interval-based multi-attribute decision making (MADM) approach in support of the decision process with imprecise information. The proposed decision methodology is based on the model of linear additive utility function but extends ... Keywords: decision making, electric utilities, power generation, resource planning

M. Sedighizadeh

2006-04-01T23:59:59.000Z

450

EIS-0183: DOE Notice of Availability of the Record of Decision...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Project (Wind Project) in Kittitas County, Washington. DOEEIS-0183, Notice of availability of record of decision (ROD) for Bonneville Power Administration; Electrical...

451

New codes and standards for utility - interconnection of AC PV modules  

DOE Green Energy (OSTI)

Photovoltaic (PV) modules that provide only ac power give new dimensions to the use of, and utility interface of, PV systems because all of the dc issues are virtually eliminated. These AC PV modules offer the important advantage that customers may now purchase a PV system without hiring a design engineer. A qualified electrician will be able to install a complete PV system that performs as expected and meets local electrical codes. Simple installations of additional AC PV modules will be possible once the proper branch circuit wiring and protection have been installed. Codes and standards are currently being written to address the utility-interconnect issues for AC PV modules and other interactive inverters. An industry-supported Task Group has recently written and submitted proposals for changes to bring Article 690 of the 1999 National Electrical Code{reg_sign} (NEC{reg_sign}) up to the state-of-the-art for PV devices such as AC PV modules. This paper summarizes the proposed code changes and standards related to the evolving AC PV module technology in the United States. Topics such as the need for dedicated branch circuits for AC PV modules in residential applications are discussed and analyzed. Requirements for limiting the number of AC modules on a branch circuit and the listing requirements that make safe installations are discussed. Coordination of all standards activities for AC module installations, the building-integrated perspectives, and utility-interface issues is discussed.

Bower, W.

1997-10-01T23:59:59.000Z

452

Investigation of Modified Ni-Cr-Mn Base Alloys for SOFC Interconnect Applications  

Science Conference Proceedings (OSTI)

Two Ni-Cr-W-Mn base alloys based on Haynes 230 were developed and evaluated against criteria relevant to SOFC interconnect applications, which included oxidation behavior under SOFC operating conditions, scale electrical conductivity, and thermal expansion. It was found that, similar to the ferritic stainless steel Crofer22 APU, additions of Mn led to the formation of a unique scale that was comprised of a M3O4 (M=Mn, Cr, Ni, ) spinel-rich top layer and Cr2O3-rich sub-layer. The modified alloys demonstrated reasonable oxidation resistance under SOFC operating conditions, though the Mn additions increased the scale growth rate and thus sacrificed to some extent the oxidation resistance of the base alloy (Haynes 230). The formation of a spinel-rich top layer improved the scale conductivity, especially during the early stages of oxidation, but the higher scale growth rate resulted in a higher rate of increase in the area-specific electrical resistance. Due to their FCC crystal structure, the Ni-Cr-W-Mn base alloys demonstrated a CTE that was higher than that of anode-supported cells and candidate ferritic stainless steels such as Crofer22 APU.

Yang, Z Gary; Singh, Prabhakar; Stevenson, Jeffry W.; Xia, Gordon

2006-09-01T23:59:59.000Z

453

Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint  

DOE Green Energy (OSTI)

Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

2012-03-01T23:59:59.000Z

454

Using CrAIN Multilayer Coatings to Improve Oxidation Resistance of Steel Interconnects for Solid Oxide Fuel Cell Stacks  

Science Conference Proceedings (OSTI)

The requirements of low cost and high-tempurature corrosion resistance for bipolar interconnect plates in solid oxide fuel cell stacks has directed attention to the use of metal plates with oxidation resistant coatings. We have investigatedt he performance of steel plates with multilayer coatings consisting of CrN for electrical conductivity and CrAIN for oxidation resistance. The coatings were deposited usin large area filterd arc deposition technolgy, and subsequently annealed in air for up to 25 hours at 800 degrees celsius. The composition, structer and morphology of the coated plates were characterized using RBS, nuclear reaction analysis, AFM and TEM techniques. By altering the architecture of the layers within the coatings, the rate of oxidation was reduced by more than an order of magnitute. Electrical resistance was measured at room temperature.

Smith, Richard J.; Tripp, C.; Knospe, Anders; Ramana, C. V.; Gorokhovsky, Vladimir I.; Shutthanandan, V.; Gelles, David S.

2004-06-01T23:59:59.000Z

455

FLIP: A flexible interconnection protocol for heterogeneous internetworking  

E-Print Network (OSTI)

This paper describes the Flexible Interconnection Protocol, or FLIP, whose main goal is to allow interconnection of heterogeneous devices with varying power, processing, and communication capabilities, ranging from simple sensors to more powerful computing devices such as laptops and desktops. The vision is that FLIP will be used to interconnect such devices forming clouds in the farthest branches/leaves of the Internet, while still providing connectivity with the existing IP-based Internet infrastructure. Through its flexible, customizable headers FLIP integrates just the functions required by a given application and that can be handled by the underlying device. Simple devices like sensors will benefit from incurring close to optimal overhead saving not only bandwidth, but, more importantly, energy. More sophisticated devices in the cloud can be responsible for implementing more complex functions like reliable/ordered data delivery, communication with other device clouds and with the IP infrastructure. FLIP is designed to provide a basic substrate on which to build network- and transport-level functionality. In heterogeneous environments, FLIP allows devices with varying capabilities to coexist and interoperate under the same network infrastructure. We present the basic design of FLIP and describe its implementation under Linux. We also report on FLIPs performance when providing IPv4 and IPv6 as well as transport-layer functionality a la TCP and UDP. We show FLIPs energy efficiency in different sensor network scenarios. For example, we use FLIP to implement the directed diffusion communication paradigm and obtain an improvement of 50 % in energy savings over an existing directed diffusion implementation. Finally, we showcase FLIPs flexibility by demonstrating its ability to incorporate new protocol functions

Ignacio Solis; Katia Obraczka

2004-01-01T23:59:59.000Z

456

METAL INTERCONNECTS FOR SOLID OXIDE FUEL CELL POWER SYSTEMS  

DOE Green Energy (OSTI)

Interconnect development is identified by the U.S. Department of Energy as a key technical area requiring focused research to meet the performance and cost goals under the Solid State Energy Conversion Alliance initiative. In the Phase I SECA Core Technology Program, Ceramatec investigated a commercial ferritic stainless steel composition for oxidation resistance properties by measuring the weight gain when exposed to air at the fuel cell operating temperature. A pre-treatment process that results in a dense, adherent scale was found to reduce the oxide scale growth rate significantly. A process for coating the surface of the alloy in order to reduce the in-plane resistance and potentially inhibit chromium oxide evaporation was also identified. The combination of treatments provided a very low resistance through the scale. The resistance measured was as low as 10 milliohm-cm{sup 2} at 750 C in air. The oxide scale was found to be stable in humidified air at 750 C. The resistance value was stable over several thermal cycles. A similar treatment and coating for the fuel side of the interconnect also showed an exceptionally low resistance of one milliohm-cm{sup 2} in humidified hydrogen at 750 C, and was stable through multiple thermal cycles. Analysis of the scale after exposure to various atmospheres showed the presence of a stable composition. When exposed to a dual (air and hydrogen) atmosphere however, the scale composition contains a mixture of phases. Based on results to-date, the alloy selection and the treatment processes appear to be well suited for SOFC interconnect application.

S. Elangovan; S. Balagopal; M. Timper; I. Bay; D. Larsen; J. Hartvigsen

2003-10-01T23:59:59.000Z

457

Production process for advanced space satellite system cables/interconnects.  

SciTech Connect

This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.

Mendoza, Luis A.

2007-12-01T23:59:59.000Z

458

GRR/Section 8-TX-c - Distributed Generation Interconnection | Open Energy  

Open Energy Info (EERE)

GRR/Section 8-TX-c - Distributed Generation Interconnection GRR/Section 8-TX-c - Distributed Generation Interconnection < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-c - Distributed Generation Interconnection 8-TX-c - Distributed Generation Interconnection.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive Rule 25.211 PUCT Substantive Rule 25.212 Triggers None specified Click "Edit With Form" above to add content 8-TX-c - Distributed Generation Interconnection.pdf 8-TX-c - Distributed Generation Interconnection.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the process for distributed generation (DG)

459

EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

84: Invenergy Interconnection for the Wray Wind Energy 84: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO EA-1884: Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO Summary DOE's Western Area Power Administration prepared this EA to evaluate the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's existing Wray Substation in Yuma County, Colorado. Public Comment Opportunities None available at this time. Documents Available for Download December 27, 2012 EA-1884: Finding of No Significant Impact Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO December 27, 2012 EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray,

460

Markov Decision Process (MDP) Framework for Optimizing Software on Mobile Phones  

E-Print Network (OSTI)

Markov Decision Process (MDP) Framework for Optimizing Software on Mobile Phones Tang Lung Cheung University of California, Davis Frank Maker Department of Electrical and Computer Engineering University Department of Electrical and Computer Engineering University of California, Davis ABSTRACT We present

Liu, Xin

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

SURFACE-MODIFIED FERRITIC INTERCONNECT MATERIALS FOR SOLID OXIDE FUEL CELLS  

DOE Green Energy (OSTI)

Interconnects are a critical element of an SOFC assembly and although much work has focused on chromium and chromium-iron alloys containing an oxide that is both oxidation resistant and electrically conductive, the thermal instability of typical native metal oxides allow interdiffusion of cations across the interconnect-electrode boundary that ultimately leads to degradation of SOFC performance. Phase I of the SECA Core Technology Program has been a one-year effort to investigate and evaluate the feasibility of: (1) Ion implanting an alumina-scale forming ferritic steel, such as FeCrAlY, to form an interconnect material with low resistance (< 0.1 {Omega}/cm{sup 2}) in oxidizing/reducing environments up to 800 C, and (2) Maintaining the above low resistance metric for an extended time (> 1000 hours at 800 C) in contact with an LSF cathode material. We confirmed, as part of our oxidation kinetics evaluation of FeCrAlY and 430 ferritic steel, the parabolic growth of a mixed chromia/alumina scale on FeCrAlY and a single chromia layer in the case of the 430 stainless steel; the outer contiguous layer of Al{sub 2}O{sub 3}, in the case of FeCrAlY, forming a stable, self-limiting, protective scale with no detectable cation interdiffusion between FeCrAlY and an LSF electrode even after 1000 hours at 800 C in air. To render the alumina scale conductive, we implanted either titanium or niobium ions into FeCrAlY scales to a fixed depth (0.12 {micro}m), varying only the thickness of the oxide. ASR for an un-doped FeCrAlY oxide scale (i.e., alumina) was more than an order of magnitude greater than the 430 control sample whereas, the ASR for the doped FeCrAlY oxide scale sample was comparable to the 430 control sample; hence, the resistance of a doped alumina scale on FeCrAlY was equal to the resistance of a chromia-scale forming alloy, such as 430 (chromia scales of which are typically < 0.1 {Omega}-cm). Along with the ASR measurements, AC impedance measurements were conducted to evaluate conduction mechanisms. From the AC impedance measurements, we observed that the addition of niobium resulted in at least a two order of magnitude reduction in resistance over the un-doped specimen and that the conduction in the doped alumina scale was pure electronic conduction, as opposed to mixed ionic-electronic conduction (dominated by intrinsic (ionic) defects) for the un-doped alumina scales. The DC resistance component was {approx}4 {Omega} although when this value is adjusted to account for the system resistance (i.e., leads, junctions, etc.), the ASR was determined to be < 0.1 {Omega}-cm; even after 1000 hours at 800 C in air. Our results have clearly shown that dopant additions increase the electronic conductivity of alumina forming scale alloys, such as FeCrAlY, transforming from a mixed ionic/electronic conduction mechanism. Just as importantly, the demonstrated stable formation of an alumina scale was shown to be an advantage over conventional pure chromia forming alloys as interconnect materials.

Bruce R. Lanning; James Arps; Ronghua Wei; Goeff Dearnaley

2004-03-15T23:59:59.000Z

462

Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)  

DOE Green Energy (OSTI)

Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperwork required of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.

Tweedie, A.; Doris, E.

2011-07-01T23:59:59.000Z

463

Generation Interconnection Policies and Wind Power: A Discussion of Issues, Problems, and Potential Solutions  

DOE Green Energy (OSTI)

This report describes the adoption and implementation of FERC Order 2003 and the reasons for the sharp rise in generation interconnection filings in recent years.

Porter, K.; Fink, S.; Mudd, C.; DeCesaro, J.

2009-01-01T23:59:59.000Z

464

Wind energy and power system interconnection, control, and operation for high penetration of wind power .  

E-Print Network (OSTI)

??High penetration of wind energy requires innovations in different areas of power engineering. Methods for improving wind energy and power system interconnection, control, and operation (more)

Liang, Jiaqi

2012-01-01T23:59:59.000Z

465

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

466

Optimal Planning and Operation of Smart Grids with Electric Vehicle  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimal Planning and Operation of Smart Grids with Electric Vehicle Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection Title Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5251E Year of Publication 2012 Authors Stadler, Michael, Chris Marnay, Maximillian Kloess, Gonçalo Cardoso, Gonçalo Mendes, Afzal S. Siddiqui, Ratnesh Sharma, Olivier Mégel, and Judy Lai Journal Journal of Energy Engineering, Special Issue: Challenges and opportunities in the 21st century energy infrastructure Volume 138 Start Page 95 Issue 2 Pagination 95-108 Date Published 06/2012 Publisher LBNL ISSN ISSN (print): 0733-9402, ISSN (online): 1943-7897 Keywords carbon emissions, combined heat and power, commercial buildings, distributed energy resources, distributed generation, electric vehicle, electricity markets and policy group, energy analysis and environmental impacts department, load shifting, microgrid, microgrids, optimization, smart grid, storage technologies

467

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

468

Software: Sprinkler Use Decisioning  

Science Conference Proceedings (OSTI)

... Sprinkler Use Decisioning is a Web-tool designed to facilitate economic analysis of residential fire sprinklers at the homeowner-and community ...

2011-05-24T23:59:59.000Z

469

Designing an intelligent decision support system for human-centered utility management automation part 1: structures, problem formulation, solution methodology  

Science Conference Proceedings (OSTI)

This paper presents a Decision Support System (DSS) to aid the electric utility management automation system. A brief history of DSS application in power systems is presented. The importance and role of DSS and decision making in utility management automation ... Keywords: computational intelligence, decision making, decision support, human-centered systems, neural networks, power distribution system, state estimation, systems design, utility management automation

Alireza Fereidunian; Caro Lucas; Hamid Lesani; Mansooreh Zangiabadi

2005-03-01T23:59:59.000Z

470

EIS-0416: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Record of Decision Record of Decision EIS-0416: Record of Decision Issuance of Loan Guarantees to Solar Partners I, LLC, Solar Partners II, LLC, and Solar Partners VIII, LLC, for Ivanpah Solar Electric Generating System Units 1, 2, 3 The U.S. Department of Energy (DOE) announces its decision to issue loan guarantees under Title XVII of the Energy Policy Act of 2005 (EPAct 05) to Solar Partners I, LLC; Solar Partners II, LLC; and Solar Partners VIII, LLC (Solar Partners) for construction and start-up of Units 1, 2, and 3 of the 370 megawatt (MW) Ivanpah Solar Electric Generating System (ISEGS) on 3,471.36 acres, all of which are managed by the U.S. Department of the Interior, Bureau of Land Management (BLM), in San Bernardino County, California. Record of Decision for Issuance of Loan Guarantees to Solar Partners I,

471

Electric Vehicles  

Energy.gov (U.S. Department of Energy (DOE))

Electricity can be used as a transportation fuel to power battery electric vehicles (EVs). EVs store electricity in an energy storage device, such as a battery.

472

Understanding the corrosion behavior of chromia-forming 316L stainless steel in dual oxidizing-reducing environment representative of SOFC interconnect  

Science Conference Proceedings (OSTI)

A and B site doped LaCrO3-based electronically conducting Perovskite ceramic materials have been extensively used as interconnects in solid oxide fule cells (SOFC) operating at 800 to 1000C as the Perovskites offer good electrical conductivity, chemical compatibility with the adjacent components of the fuel cell, chemical stability in reducing and oxidizing atmospheres, and thermal expansion coefficients that match other cell components. However, requirements for good mechanical properties, electrical and thermal conductivities, and low cost make metallic interconnects more promising. Significant progress in reducing the operating temperature of SOFC from ~1000C to ~750C is expected to permit the use of metallic materials with substantial cost reduction. Among the commercially available metallic materials, Cr2O3 (chromia) scale-forming iron base alloys appear to be the most promising candidates since they can fulfill the technical and economical requirements. These alloys, however, remain prone to reactions with oxygen and water vapor at fuel cell operating conditions and formation of gaseous chromium oxides and oxyhydroxides. To study the degradation processes and corrosion mechanisms of commercial chromia scale-forming alloys under SOFC interconnect exposure conditions, 316L was selected for this research because of the availability of the materials. The dual environment to which the interconnect material was exposed consisted of dry air (simulates the cathode side environment) and a mixture of H2 and 3% H2O (simulates the anode side environment). Post-corrosion surface evaluation involved the use of optical and scanning electron microscopy, as well as energy dispersive X-ray analyses.

Ziomek-Moroz, Margaret; Cramer, Stephen D.; Holcomb, Gordon R.; Covino, Bernard S., Jr.; Matthes, Steven A.; Bullard, Sophie J.; Dunning, John S.; Alman, David E.; Singh, P. (PNNL)

2003-11-01T23:59:59.000Z

473

Smart buildings with electric vehicle interconnection as buffer for local renewables?  

DOE Green Energy (OSTI)

Some conclusions from this presentation are: (1) EV Charging/discharging pattern mainly depends on the objective of the building (cost versus CO{sub 2}); (2) performed optimization runs show that stationary batteries are more attractive than mobile storage when putting more focus on CO{sub 2} emissions because stationary storage is available 24 hours a day for energy management - it's more effective; (3) stationary storage will be charged by PV, mobile only marginally; and (4) results will depend on the considered region and tariff. Final research work will show the results for 138 different buildings in nine different climate zones and three major utility service territories.

Stadler, Michael; Cardoso, Goncalo; DeForest, Nicholas; Donadee, Jon; Gomez, Tomaz; Lai, Judy; Marnay, Chris; Megel, Olivier; Mendes, Goncalo; Siddiqui, Afzal

2011-05-01T23:59:59.000Z

474

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

and Marnay, C. (2007). Microgrids, An Overview of Ongoingand Operation of Microgrids in Commercial Buildings, IEEEwith commercial smartgrids/microgrids, which may include

Stadler, Michael

2012-01-01T23:59:59.000Z

475

Smart buildings with electric vehicle interconnection as buffer for local renewables?  

E-Print Network (OSTI)

SVOW), http://der.lbl.gov/microgrids-lbnl/current-project-to commercial building microgrids, 2nd European Conference2009, Special Issue on Microgrids and Energy Management,

Stadler, Michael

2012-01-01T23:59:59.000Z

476

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

with and without absorption chillers. A microgrid is a groupthermal collectors, absorption chiller systems as well as

Stadler, Michael

2012-01-01T23:59:59.000Z

477

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

appear in different zones at the same time and b) hot water loads. The NYC nursing home shows less equipment options, discrete investments reciprocating engine fuel cell capacity (kW) 100 200 sprint capacity.g., reciprocating engines have these characteristics. The costs for the discrete fuel cell22 technology

478

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

technologies, $ EV battery degradation costs, $ variablemeasure costs, EV battery degradation costs, and sales. minCL RC bat EV battery degradation annual costs caused by the

Stadler, Michael

2012-01-01T23:59:59.000Z

479

Protective coating on stainless steel interconnect for SOFCs: Oxidation kinetics and electrical properties  

E-Print Network (OSTI)

Kock, in Proc.1 st European SOFC Forum, U. Bossel, Ed. , p.Stainless steel, Cr 2 O 3 , SOFC, ASR Corresponding author.with the other parts of the SOFC 4) Zero open porosity and

Chen, Xuan; Hou, Peggy Y.; Jacobson, Craig P.; Visco, Steven J.; De Jonghe, Lutgard C.

2004-01-01T23:59:59.000Z

480

Optimal Planning and Operation of Smart Grids with Electric Vehicle Interconnection  

E-Print Network (OSTI)

can use this additional battery capacity to lower its energySOC SOC ? c ? dc EV battery capacity, kWh EV battery maximumand no stationary battery capacity. One reason for this is

Stadler, Michael

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "decision electrical interconnection" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time