Sample records for day operating capacity

  1. Generalized computer-assisted operations; A comprehensive system for day-to-day oilfield operations

    SciTech Connect (OSTI)

    Dunham, C.L.; Anderson, S.R. (Shell Oil Co. (US))

    1991-03-01T23:59:59.000Z

    This paper reports that Shell Oil Co. and a U.S. subsidiary, Shell Western E and P Inc., developed a comprehensive, generalized, computer-assisted-operations (CAO) system for day-to-day oilfield operations. The system addresses many of the daily operating needs of data acquisition, well and facility monitoring and control, problem detection and diagnosis, design and/or redesign of artificial-lift systems, and oilfield data management. It is generalized in that one system, with common computer hardware, software, and techniques, serves several different oil fields with diverse operating requirements and conditions.

  2. Optimizing the Day to Day Operation of Utility Systems

    E-Print Network [OSTI]

    Eastwood, A.; Bealing, C.

    applications of this utility system software were set up for planning purposes, largely off-line. More recently, these applications have become more sophisticated and can operate on-line in real time. They include complex optimization routines to ensure...

  3. Atmospheric Crude Oil Distillation Operable Capacity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperational ManagementDemand Module ThisAt NREL,TheDust

  4. Flood control reservoir operations for conditions of limited storage capacity

    E-Print Network [OSTI]

    Rivera Ramirez, Hector David

    2005-02-17T23:59:59.000Z

    ). Therefore, if the entire flood control capacity of a reservoir is available, only an extremely severe flood event would require the implementation of the EOS for most reservoir projects, and thus the bulk of the research has been focused on how to manage... operations objectives. In other words, the REOS provide a set of rules that reflect the risk of flooding upstream as well as downstream of the dams. The USACE and other reservoir management agencies may use the methodology proposed in this study...

  5. Development of operations based long range network capacity planning models

    E-Print Network [OSTI]

    Wilson, Cynthia M. (Cynthia Marie)

    2011-01-01T23:59:59.000Z

    Planning for vaccines manufacturing capacity is both a complex task requiring many inputs and an important function of manufacturers to ensure the supply of vaccines that prevent life-threatening illnesses. This thesis ...

  6. Impacts of Improved Day-Ahead Wind Forecasts on Power Grid Operations: September 2011

    SciTech Connect (OSTI)

    Piwko, R.; Jordan, G.

    2011-11-01T23:59:59.000Z

    This study analyzed the potential benefits of improving the accuracy (reducing the error) of day-ahead wind forecasts on power system operations, assuming that wind forecasts were used for day ahead security constrained unit commitment.

  7. High energy bursts from a solid state laser operated in the heat capacity limited regime

    DOE Patents [OSTI]

    Albrecht, G.; George, E.V.; Krupke, W.F.; Sooy, W.; Sutton, S.B.

    1996-06-11T23:59:59.000Z

    High energy bursts are produced from a solid state laser operated in a heat capacity limited regime. Instead of cooling the laser, the active medium is thermally well isolated. As a result, the active medium will heat up until it reaches some maximum acceptable temperature. The waste heat is stored in the active medium itself. Therefore, the amount of energy the laser can put out during operation is proportional to its mass, the heat capacity of the active medium, and the temperature difference over which it is being operated. The high energy burst capacity of a heat capacity operated solid state laser, together with the absence of a heavy, power consuming steady state cooling system for the active medium, will make a variety of applications possible. Alternately, cooling takes place during a separate sequence when the laser is not operating. Industrial applications include new material working processes. 5 figs.

  8. High energy bursts from a solid state laser operated in the heat capacity limited regime

    DOE Patents [OSTI]

    Albrecht, Georg (Livermore, CA); George, E. Victor (Livermore, CA); Krupke, William F. (Pleasanton, CA); Sooy, Walter (Pleasanton, CA); Sutton, Steven B. (Manteca, CA)

    1996-01-01T23:59:59.000Z

    High energy bursts are produced from a solid state laser operated in a heat capacity limited regime. Instead of cooling the laser, the active medium is thermally well isolated. As a result, the active medium will heat up until it reaches some maximum acceptable temperature. The waste heat is stored in the active medium itself. Therefore, the amount of energy the laser can put out during operation is proportional to its mass, the heat capacity of the active medium, and the temperature difference over which it is being operated. The high energy burst capacity of a heat capacity operated solid state laser, together with the absence of a heavy, power consuming steady state cooling system for the active medium, will make a variety of applications possible. Alternately, cooling takes place during a separate sequence when the laser is not operating. Industrial applications include new material working processes.

  9. U.S. Downstream Charge Capacity of Operable Petroleum Refineries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron Spin Transition in2,EHSS A-Zandofpoint motional%^602SWPACharge Capacity

  10. Overview paper Stochasticity of freeway operational capacity and chance-constrained

    E-Print Network [OSTI]

    Levinson, David M.

    . It is found that values of freeway operational capacity under different traffic flow conditions generally fit homepage: www.elsevier.com/locate/trc ARTICLE IN PRESS Please cite this article in press as: Liu, H.X., Wu

  11. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries

    SciTech Connect (OSTI)

    Belzer, D.B. (Pacific Northwest Lab., Richland, WA (USA)); Serot, D.E. (D/E/S Research, Richland, WA (USA)); Kellogg, M.A. (ERCE, Inc., Portland, OR (USA))

    1991-03-01T23:59:59.000Z

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner that allows evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study, conducted by Pacific Northwest Laboratory (PNL), developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key non-manufacturing sectors. This volume presents tabular and graphical results of the historical analysis and projections for each SIC industry. (JF)

  12. Generating day-of-operation probabilistic capacity scenarios from weather forecasts

    E-Print Network [OSTI]

    Buxi, Gurkaran

    2012-01-01T23:59:59.000Z

    user needs for convective weather forecasts," in AmericanJ. Andrews M. Weber, "Weather Information Requirements forInt. Conf. on Aviation Weather, Paris, France. [5] NASDAC. (

  13. Capacity analysis, cycle time optimization, and supply chain strategy in multi-product biopharmaceutical manufacturing operations

    E-Print Network [OSTI]

    Fetcho-Phillips, Kacey L. (Kacey Lynn)

    2011-01-01T23:59:59.000Z

    Application of system optimization theory, supply chain principles, and capacity modeling are increasingly valuable tools for use in pharmaceutical manufacturing facilities. The dynamics of the pharmaceutical industry - ...

  14. Impact of Heavy Aircraft Operations on Airport Capacity at Newark Liberty International Airport

    E-Print Network [OSTI]

    Gummadi, Ramakrishna

    Federal Aviation Administration IMC Instrument Meteorological Conditions JFK New York John F. Kennedy capacity. Acronyms ASPM Aviation System Performance Metrics EWR Newark Liberty International Airport FAA, Cambridge, MA 02139, USA Aviation System Performance Metrics (ASPM) departure and arrival rate data is col

  15. Drart environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    SciTech Connect (OSTI)

    Not Available

    1991-04-01T23:59:59.000Z

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  16. Maintenance-free Operation of WDM Quantum Key Distribution System through a Field Fiber over 30 Days

    E-Print Network [OSTI]

    Ken-ichiro Yoshino; Takao Ochi; Mikio Fujiwara; Masahide Sasaki; Akio Tajima

    2013-08-05T23:59:59.000Z

    Maintenance-free wavelength-division-multiplexing quantum key distribution for 30 days was achieved through a 22-km field fiber. Using polarization-independent interferometers and stabilization techniques, we attained a quantum bit error rate as low as 1.70% and a key rate as high as 229.8 kbps, making the record of total secure key of 595.6 Gbits accumulated over an uninterrupted operation period.

  17. "ALON ISRAEL OIL COMPANY LTD",820,14,"ALON BAKERSFIELD OPERATING...

    U.S. Energy Information Administration (EIA) Indexed Site

    OPERATING INC","West Coast","California","BAKERSFIELD",5,"HYDROGEN (MMCFD)","Production Capacity, Current Year (barrels per steam day except sulfur and hydrogen)",23 "ALON...

  18. Applications of operation research to the analysis for the impacts of the transmission line capacity limitation on

    E-Print Network [OSTI]

    capacity limitation on clean power development Jinxu Ding and Arun Somani 1 Abstract--As global warming has system development. In the tool, we 1Department of Electrical and Computer Engineering, Iowa State Uni regulation that requires the increased production of energy from renewable energy sources, such as wind

  19. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    SciTech Connect (OSTI)

    Not Available

    1991-04-01T23:59:59.000Z

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  20. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    SciTech Connect (OSTI)

    Not Available

    1991-04-01T23:59:59.000Z

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  1. Refinery Capacity Report

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    by State as of January 1, 2006 PDF 5 Refiners' Operable Atmospheric Crude Oil Distillation Capacity as of January 1, 2006 PDF 6 Operable Crude Oil and Downstream Charge...

  2. Representation of Solar Capacity Value in the ReEDS Capacity Expansion Model

    SciTech Connect (OSTI)

    Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

    2014-03-01T23:59:59.000Z

    An important issue for electricity system operators is the estimation of renewables' capacity contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to the resource variability. Reliability-based methods, particularly assessment of the Effective Load-Carrying Capacity, are considered to be the most robust and widely-accepted techniques for addressing this resource variability. This report compares estimates of solar PV capacity value by the Regional Energy Deployment System (ReEDS) capacity expansion model against two sources. The first comparison is against values published by utilities or other entities for known electrical systems at existing solar penetration levels. The second comparison is against a time-series ELCC simulation tool for high renewable penetration scenarios in the Western Interconnection. Results from the ReEDS model are found to compare well with both comparisons, despite being resolved at a super-hourly temporal resolution. Two results are relevant for other capacity-based models that use a super-hourly resolution to model solar capacity value. First, solar capacity value should not be parameterized as a static value, but must decay with increasing penetration. This is because -- for an afternoon-peaking system -- as solar penetration increases, the system's peak net load shifts to later in the day -- when solar output is lower. Second, long-term planning models should determine system adequacy requirements in each time period in order to approximate LOLP calculations. Within the ReEDS model we resolve these issues by using a capacity value estimate that varies by time-slice. Within each time period the net load and shadow price on ReEDS's planning reserve constraint signals the relative importance of additional firm capacity.

  3. Forward capacity market CONEfusion

    SciTech Connect (OSTI)

    Wilson, James F.

    2010-11-15T23:59:59.000Z

    In ISO New England and PJM it was assumed that sponsors of new capacity projects would offer them into the newly established forward centralized capacity markets at prices based on their levelized net cost of new entry, or ''Net CONE.'' But the FCCMs have not operated in the way their proponents had expected. To clear up the CONEfusion, FCCM designs should be reconsidered to adapt them to the changing circumstances and to be grounded in realistic expectations of market conduct. (author)

  4. Start | Grid View | Browse by Day OR Group/Topical | Author Index | Keyword Index | Personal Scheduler Active Constraint Regions for Economically Optimal Operation of Distillation

    E-Print Network [OSTI]

    Skogestad, Sigurd

    Scheduler Active Constraint Regions for Economically Optimal Operation of Distillation Columns Tuesday and operation of distillation columns has been widely studied, as illustrated by for example Skogestad (1993 operation of distillation columns has been studied relatively little. The issue of active constraints

  5. EIS-0144: Siting, Construction, and Operation of New Production Reactor Capacity; Hanford Site, Idaho National Engineering Laboratory, and Savannah River Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to assess the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation's nuclear defense requirements well into the 21st century.

  6. Dual capacity reciprocating compressor

    DOE Patents [OSTI]

    Wolfe, R.W.

    1984-10-30T23:59:59.000Z

    A multi-cylinder compressor particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor rotation is provided with an eccentric cam on a crank pin under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180[degree] apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons whose connecting rods ride on a crank pin without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation. 6 figs.

  7. Dual capacity reciprocating compressor

    DOE Patents [OSTI]

    Wolfe, Robert W. (Wilkinsburg, PA)

    1984-01-01T23:59:59.000Z

    A multi-cylinder compressor 10 particularly useful in connection with northern climate heat pumps and in which different capacities are available in accordance with reversing motor 16 rotation is provided with an eccentric cam 38 on a crank pin 34 under a fraction of the connecting rods, and arranged for rotation upon the crank pin between opposite positions 180.degree. apart so that with cam rotation on the crank pin such that the crank throw is at its normal maximum value all pistons pump at full capacity, and with rotation of the crank shaft in the opposite direction the cam moves to a circumferential position on the crank pin such that the overall crank throw is zero. Pistons 24 whose connecting rods 30 ride on a crank pin 36 without a cam pump their normal rate with either crank rotational direction. Thus a small clearance volume is provided for any piston that moves when in either capacity mode of operation.

  8. A California generation capacity market

    SciTech Connect (OSTI)

    Conkling, R.L.

    1998-10-01T23:59:59.000Z

    California, overconfident with its new Power Exchange spot market, seems unaware that it could be afflicted by the same turmoil that bludgeoned the Midwest in June. An electricity capacity market should be put in place before crisis strikes. This article outlines a framework for adding an electricity capacity market in California. The new market would not create a new bureaucracy but would function within the state`s now operational PX and independent system operator (ISO) mechanisms. It would be an open market, in which capacity would be traded transparently, with freedom of entree for all willing sellers and all willing buyers.

  9. Solar Energy and Capacity Value (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-09-01T23:59:59.000Z

    This is a one-page, two-sided fact sheet on the capacity of solar power to provide value to utilities and power system operators.

  10. Day 1 Day 2 Day 3 Day 4 Day 5 Cold cereal Toast Oatmeal Cold cereal Scones

    E-Print Network [OSTI]

    Farritor, Shane

    Water Milk Black Bean Salsa/Water Milk Milk Day 1 Day 2 Day 3 Day 4 Day 5 Ranch Crackers Day 1 Day 2 Day 3 Day 4 Day 5 Bean Burrito Veggie Pizza Chicken Alfredo Ham slices/Cheese Hummus Sand. Bean Taco Cheesey Hashbrown Casserole Bean and Noodles Italian Blend

  11. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Operable

  12. GIS Day(s) Palooza Extravaganza 2013

    E-Print Network [OSTI]

    Weimer, Kathy

    2014-10-22T23:59:59.000Z

    A summary of the Texas A & M University GIS Day 2013 outreach and instruction events, presented to TAMU Libraries staff....

  13. MEASUREMENT OF SPECIFIC HEAT CAPACITY OF SALTSTONE

    SciTech Connect (OSTI)

    Harbour, J; Vickie Williams, V

    2008-09-29T23:59:59.000Z

    One of the goals of the Saltstone variability study is to identify (and quantify the impact of) the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. The heat capacity of the Saltstone waste form is one of the important properties of Saltstone mixes that was last measured at SRNL in 1997. It is therefore important to develop a core competency for rapid and accurate analysis of the specific heat capacity of the Saltstone mixes in order to quantify the impact of compositional and operational variations on this property as part of the variability study. The heat capacity, coupled with the heat of hydration data obtained from isothermal calorimetry for a given Saltstone mix, can be used to predict the maximum temperature increase in the cells within the vaults of the Saltstone Disposal Facility (SDF). The temperature increase controls the processing rate and the pour schedule. The maximum temperature is also important to the performance properties of the Saltstone. For example, in mass pours of concrete or grout of which Saltstone is an example, the maximum temperature increase and the maximum temperature difference (between the surface and the hottest location) are controlled to ensure durability of the product and prevent or limit the cracking caused by the thermal gradients produced during curing. This report details the development and implementation of a method for the measurement of the heat capacities of Saltstone mixes as well as the heat capacities of the cementitious materials of the premix and the simulated salt solutions used to batch the mixes. The developed method utilizes the TAM Air isothermal calorimeter and takes advantage of the sophisticated heat flow measurement capabilities of the instrument. Standards and reference materials were identified and used to validate the procedure and ensure accuracy of testing. Heat capacities of Saltstone mixes were {approx} 55% higher than the previous measurement of specific heat capacity on a reference Saltstone mix in 1997. Values of mixes prepared using Deliquification, Dissolution and Adjustment (DDA), Modular Caustic Side Solvent Extraction Unit (MCU) and Salt Waste Processing Facility (SWPF) simulants and premix at 0.60 w/cm ratio were {approx} 1.95 J/g/{sup o}C and were equivalent within experimental error. The simple law of mixtures was used to predict the heat capacities of the Saltstone and the results were in excellent agreement with experimental data. This simple law of mixtures can therefore be used to predict the heat capacities of Saltstone mixes in those cases where measurements have not been made. The time dependence of the heat capacity is important as an input to the modeling of temperature increase in Saltstone vaults. The heat capacity of a mix of MCU and premix at 0.60 w/cm ratio was measured immediately after initial mixing and then periodically up to times greater than 100 days. Within experimental error, the heat capacity did not change with time. Therefore, the modeling is not complicated by requiring a time dependent function for specific heat capacity. The water to cementitious material (w/cm) ratio plays a key role in determining the value of the heat capacity. Both experimental and predictive values for SWPF mixes as function of the w/cm ratio were obtained and presented in this report. Predictions of the maximum temperatures of the Saltstone mixes were made using the heat of hydration data from previous isothermal measurements and the newly measured heat capacities for DDA, MCU and SWPF mixes. The maximum temperature increase ranged from 37 to 48 C for these mixes. The presence of aluminate at 0.33 M produced a temperature increase of 68 C which is close to the adiabatic temperature rise of 74 C observed by Steimke and Fowler in 1997 for a mix containing 0.35 M aluminate. Aluminum dissolution of the sludge will increase the aluminate in the DSS which in turn will result in a larger temperature increase in the Saltstone vaults during the curing p

  14. Atmospheric Crude Oil Distillation Operable Capacity

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 OilU.S.5AreOil andMarket Module This

  15. Day 1 Day 2 Day 3 Day 4 Day 5 Whole Grain Cereal Bagel Oatmeal Whole Grain Cereal Scones

    E-Print Network [OSTI]

    Powers, Robert

    Apple Sauce WG Chips, Crackers for Pre.Tod. Nutrigrain Bar Teachers choice Water Milk Black Bean Salsa/Water Week 5 Week 1 #12;LUNCH Day 1 Day 2 Day 3 Day 4 Day 5 Black Bean Quesadilla Hummus Sand. w Meatball Sub. Veg. Burger Apricots Fresh Oranges Fresh Zucchini Green Beans Fresh Sweet Potatoes Milk Milk

  16. The NASA CSTI High Capacity Power Project

    SciTech Connect (OSTI)

    Winter, J.; Dudenhoefer, J.; Juhasz, A.; Schwarze, G.; Patterson, R.; Ferguson, D.; Titran, R. [National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center; Schmitz, P. [Sverdrup Technology, Inc., Brook Park, OH (United States). Lewis Research Center Group; Vandersande, J. [Jet Propulsion Lab., Pasadena, CA (United States)

    1994-09-01T23:59:59.000Z

    The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase I of SP-100 and to strengthen, in key areas, the changes for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the CSTI High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project with develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

  17. E-Science Day

    E-Print Network [OSTI]

    Abad, Raquel

    2012-01-01T23:59:59.000Z

    on December 6, 2011, E-Science Day was a day-long event,regional librarians in e-science, and to expose regionalthe initiation of e-science support projects within their

  18. Argonne's Earth Day 2011

    ScienceCinema (OSTI)

    None

    2013-04-19T23:59:59.000Z

    Argonne celebrated Earth Day on April 21, 2011 with an event that featured green activities and information booths.

  19. Manure Storage Winter Capacity Planning Level Guidance January 1, 2013

    E-Print Network [OSTI]

    Guiltinan, Mark

    1 Manure Storage Winter Capacity Planning Level Guidance January 1, 2013 The guidance outlined in this document is to be used to determine the Manure Storage Winter Capacity Planning Level for CAFO operations must be documented in the NMP Standard Format. For determining the manure storage winter capacity

  20. The NASA CSTI High Capacity Power Program

    SciTech Connect (OSTI)

    Winter, J.M.

    1994-09-01T23:59:59.000Z

    The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase I of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA`s new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems - Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability and 7 to 10 years lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operation as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed.

  1. REX WALHEIM, MS-2 (GREEN) Meal Day 1* Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 -JULY 4th MEAL

    E-Print Network [OSTI]

    Special Meal **Day 13 consists of Meals A and B only (B) - Beverage, (FF) - Fresh Food, (I) - Irradiated

  2. Design of a cluster analysis heuristic for the configuration and capacity management of manufacturing cells

    E-Print Network [OSTI]

    Shim, Young Hak

    2007-09-17T23:59:59.000Z

    , the machine capacity was first ensured, and then manufacturing cells were configured to minimize intercellular movements. In order to ensure the machine capacity, the duplication of machines and the split of operations are allowed and operations are assigned...

  3. Capacity Markets for Electricity

    E-Print Network [OSTI]

    Creti, Anna; Fabra, Natalia

    2004-01-01T23:59:59.000Z

    Designing Markets for Electricity. Wiley IEEE Press. [25]in the England and Wales Electricity Market”, Power WorkingFelder (1996), “Should Electricity Markets Have a Capacity

  4. ORISE: Capacity Building

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capacity Building Because public health agencies must maintain the resources to respond to public health challenges, critical situations and emergencies, the Oak Ridge Institute...

  5. : : ". RSST I Lunar Day Counter Reliability Analysis

    E-Print Network [OSTI]

    Rathbun, Julie A.

    : : ". RSST I Lunar Day Counter Reliability Analysis NO. ATM 846 PAGE 1 REV. MO. OF 10 DATE 12/3/69 This ATM presents a Reliability analysis of the Lunar Day Counter, the Resettable Solid State Timer (RSST equipment. The analysis is based on a parts count, average failure rates and two (2) years operation

  6. National Day of Remembrance

    ScienceCinema (OSTI)

    None

    2013-03-01T23:59:59.000Z

    Ames Laboratory observed the National Day of Remembrance for weapons workers from the Cold War era with a ceremony held Oct. 27, 2009 at the Ames Public Library.

  7. National Day of Remembrance

    SciTech Connect (OSTI)

    None

    2010-01-01T23:59:59.000Z

    Ames Laboratory observed the National Day of Remembrance for weapons workers from the Cold War era with a ceremony held Oct. 27, 2009 at the Ames Public Library.

  8. Celebrating Pi Day

    Broader source: Energy.gov [DOE]

    We are celebrating this Pi Day with a brief overview of the irrational and transcendental number known as Pi, with baked homophone.

  9. Conflict Resolution Day

    Broader source: Energy.gov [DOE]

    Conflict Resolution Day takes a look at mediation, conciliation, negotiation, arbitration, the ombudsman, and facilitation to resolve conflict in the workplace. Employees and contractors are...

  10. Liquid heat capacity lasers

    DOE Patents [OSTI]

    Comaskey, Brian J. (Walnut Creek, CA); Scheibner, Karl F. (Tracy, CA); Ault, Earl R. (Livermore, CA)

    2007-05-01T23:59:59.000Z

    The heat capacity laser concept is extended to systems in which the heat capacity lasing media is a liquid. The laser active liquid is circulated from a reservoir (where the bulk of the media and hence waste heat resides) through a channel so configured for both optical pumping of the media for gain and for light amplification from the resulting gain.

  11. Knudsen heat capacity

    SciTech Connect (OSTI)

    Babac, Gulru, E-mail: babac@itu.edu.tr [Institute of Energy, Istanbul Technical University, Istanbul 34469 (Turkey)] [Institute of Energy, Istanbul Technical University, Istanbul 34469 (Turkey); Reese, Jason M. [School of Engineering, University of Edinburgh, Edinburgh EH9 3JL (United Kingdom)] [School of Engineering, University of Edinburgh, Edinburgh EH9 3JL (United Kingdom)

    2014-05-15T23:59:59.000Z

    We present a “Knudsen heat capacity” as a more appropriate and useful fluid property in micro/nanoscale gas systems than the constant pressure heat capacity. At these scales, different fluid processes come to the fore that are not normally observed at the macroscale. For thermodynamic analyses that include these Knudsen processes, using the Knudsen heat capacity can be more effective and physical. We calculate this heat capacity theoretically for non-ideal monatomic and diatomic gases, in particular, helium, nitrogen, and hydrogen. The quantum modification for para and ortho hydrogen is also considered. We numerically model the Knudsen heat capacity using molecular dynamics simulations for the considered gases, and compare these results with the theoretical ones.

  12. Optimization Online - Operations Risk Management by Planning ...

    E-Print Network [OSTI]

    Emmanuel Fragnière

    2007-08-01T23:59:59.000Z

    Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragnière(Emmanuel.Fragniere ***at*** ...

  13. The economics of shutting and restarting primary aluminium smelting capacity

    SciTech Connect (OSTI)

    Driscoll, K.J. [CRU International, Ltd., London (United Kingdom)

    1996-10-01T23:59:59.000Z

    In recent years the aluminum industry in the Western world has been operating well below capacity, with cutbacks in production due largely to the depressed aluminum market conditions of 1992 and 1993. Since mid-1995, however, aluminum producers have begun restarting idled capacity. Extensive efforts and preparation are required both to close capacity in an orderly manner and to restart idled capacity. This paper presents a comprehensive analysis of the costs of shutting capacity, maintaining idled capacity, and restarting potlines. Costs have been calculated for a smelter which may be considered representative of the industry as a whole. Technical aspects and commercial data are outlined for the representative smelter, with costs presented under a variety of shutdown and restart conditions. Additionally, the time required to bring capacity back on-line is examined for several scenarios, and the economic impact of idled capacity is discussed.

  14. Holocaust Days of Remembrance

    Broader source: Energy.gov [DOE]

    The United States Congress established the Days of Remembrance as our nation’s annual commemoration of the Holocaust and created the United States Holocaust Memorial Museum as a permanent living...

  15. National Bioenergy Day 2014

    Broader source: Energy.gov [DOE]

    Bioenergy, the use of agricultural waste and forestry byproducts to generate heat and energy, will be celebrated during the second annual National Bioenergy Day on October 22, 2014. This is an...

  16. HOLOCAUST REMEMBRANCE DAY

    Broader source: Energy.gov [DOE]

    The United States Congress established the Days of Remembrance as our nation’s annual commemoration of the Holocaust and created the United States Holocaust Memorial Museum as a permanent living memorial to the victims.

  17. Refinery Capacity Report

    Gasoline and Diesel Fuel Update (EIA)

    Capacity Report June 2014 With Data as of January 1, 2014 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by...

  18. Start | Grid View | Browse by Day OR Group/Topical | Author Index | Keyword Index | Personal Scheduler Optimal Operation of a CO2 Capturing Plant for a Wide Range of Disturbances

    E-Print Network [OSTI]

    Skogestad, Sigurd

    flowrate coming from the power plant) change over the expected operating window. Dynamic simulation. The stripping column uses a large fraction, about 15-30% of the net power generated in the power plant. Optimal Scheduler Optimal Operation of a CO2 Capturing Plant for a Wide Range of Disturbances Tuesday, October 18

  19. Electricity market module: Electricity capacity planning submodule

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    The purpose of this report is to describe modifications to the Electricity Capacity Planning Submodule (ECP) for the Annual Energy Outlook 1996. It describes revisions to enhance the representation of planned maintenance, incorporate technological improvements in operating efficiencies, revise the algorithm for determining international firm power imports, and include risk premiums for new plant construction.

  20. Operating Efficiency Comes From Teamwork

    E-Print Network [OSTI]

    Relyea, D. L.; Stone, A.

    A group of operating and planning personnel formed the INter Plant Utilities Team [INPUT] to improve energy efficiency and reliability for Exxon's Baytown, Texas, refinery and chemical plants complex. The Team coordinates the day-to-day operations...

  1. Quantum Channel Capacities

    E-Print Network [OSTI]

    Graeme Smith

    2010-07-16T23:59:59.000Z

    A quantum communication channel can be put to many uses: it can transmit classical information, private classical information, or quantum information. It can be used alone, with shared entanglement, or together with other channels. For each of these settings there is a capacity that quantifies a channel's potential for communication. In this short review, I summarize what is known about the various capacities of a quantum channel, including a discussion of the relevant additivity questions. I also give some indication of potentially interesting directions for future research.

  2. NanoDays

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: GridTruck PlatooningJefferson7593 LECTIJHES ONTheStorage -NanoDays

  3. John Day Tailrace MASS2 Hydraulic Modeling

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Richmond, Marshall C.

    2003-06-03T23:59:59.000Z

    Recent biological results for the Juvenile Bypass System at John Jay Lock and Dam have raised concerns about the hydraulic conditions that are created in the tailrace under different project operations. This Memorandum for Record discusses the development and application of a truncated MASS2 model in the John Day tailrace.

  4. Multivariable controller increased MTBE complex capacity

    SciTech Connect (OSTI)

    Robertson, D.; Peterson, T.J.; O`Connor, D. [DMC Corp., Houston, TX (United States); Payne, D.; Adams, V. [Valero Refining Co., Corpus Christi, TX (United States)

    1997-03-01T23:59:59.000Z

    Capacity increased by more than 4.6% when one dynamic matrix multivariable controller began operating in Valero Refining Company`s MTBE production complex in Corpus Christi, Texas. This was on a plant that was already running well above design capacity due to previously made process changes. A single controller was developed to cover an isobutane dehydrogenation (ID) unit and an MTBE reaction and fractionation plant with the intermediate isobutylene surge drum. The overall benefit is realized by a comprehensive constrained multivariable predictive controller that properly handles all sets of limits experienced by the complex, whether limited by the front-end ID or back-end MTBE units. The controller has 20 manipulated, 6 disturbance and 44 controlled variables, and covers widely varying dynamics with settling times ranging from twenty minutes to six hours. The controller executes each minute with a six hour time horizon. A unique achievement is intelligent surge drum level handling by the controller for higher average daily complex capacity as a whole. The ID unit often operates at simultaneous limits on reactor effluent compressor capacity, cold box temperature and hydrogen/hydrocarbon ratio, and the MTBE unit at impurity in butene column overhead as well as impurity in MTBE product. The paper discusses ether production, isobutane dehydrogenation, maximizing production, controller design, and controller performance.

  5. Proceedings, Dean's Day 1999

    SciTech Connect (OSTI)

    Zanner, M.A.

    1999-03-01T23:59:59.000Z

    On January 14--15, 1999, Sandia National Laboratories sponsored Deans Day, a conference for the Deans of Engineering and other executive-level representatives from 29 invited universities. Through breakout sessions and a wrap-up discussion, university and Sandia participants identified activities to further develop their strategic relationships. The four primary activities are: (A) concentrate joint efforts on current and future research strengths and needs; (B) attract the best students (at all grade levels) to science and engineering; (C) promote awareness of the need for and work together to influence a national science and technology R and D policy; and (D) enable the universities and Sandia to be true allies, jointly pursuing research opportunities and funding from government agencies and industry.

  6. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Report

  7. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity Report5

  8. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity

  9. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard Errors for Table 1.1;"21Capacity

  10. Refinery Capacity Report

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source:Additions to Capacity onThousand(Dollars2009Rail

  11. Refinery Capacity Report Historical

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source:Additions to Capacity onThousand(Dollars2009Rail

  12. ORISE: Capacity Building

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparencyDOE Project *1980-1981 U.S.CapabilitiesCapacity Building

  13. Earth Day 2010: Earth Day 40th Anniversary Poster

    E-Print Network [OSTI]

    Nowacka, Izabela

    2010-01-01T23:59:59.000Z

    EGJ Issue 30 Earth Day 2010 ISSN 1076-7975 In celebration of 40 Earth Day the Electronic GreenEconomics, Poznan, Poland. Earth image used from www.sxc.hu.

  14. Trinity College Day Information Booklet

    E-Print Network [OSTI]

    O'Mahony, Donal E.

    1 Trinity College Day Nursery Parents Information Booklet 2010 Trinity Day Nursery House 49/50 Trinity College Dublin 2 Ireland Ph: 01 8962277 #12;2 Introduction The Day Nursery was set up in 1969. It provides care for children of students and staff of Trinity College. The Nursery has a maximum of 52 full

  15. Managing nuclear predominant generating capacity

    SciTech Connect (OSTI)

    Bouget, Y.H.; Herbin, H.C.; Carbonnier, D.

    1998-07-01T23:59:59.000Z

    The most common belief, associated with nuclear power plant, leads to the conclusion that it can only operate, as a base load plant. This observation can be reversed, by just looking at large generating capacity, using an important nuclear generation mix. Nuclear plants may certainly load follow and contribute to the grid frequency control. The French example illustrates these possibilities. The reactor control of French units has been customized to accommodate the grid requests. Managing such a large nuclear plant fleet requires various actions be taken, ranging from a daily to a multi-annual perspective. The paper describes the various contributions leading to safe, reliable, well accepted and cost competitive nuclear plants in France. The combination of all aspects related to operations, maintenance scheduling, nuclear safety management, are presented. The use of PWR units carries considerable weight in economic terms, with several hundred million francs tied in with outage scheduling every year. This necessitates a global view of the entire generating system which can be mobilized to meet demand. There is considerable interaction between units as, on the one hand, they are competing to satisfy the same need, and, on the other hand, reducing maintenance costs means sharing the necessary resources, and thus a coordinated staggering of outages. In addition, nuclear fuel is an energy reserve which remains in the reactor for 3 or 4 years, with some of the fuel renewed each year. Due to the memory effect, the fuel retains a memory of past use, so that today's choices impact upon the future. A medium-term view of fuel management is also necessary.

  16. North Dakota Refining Capacity Study

    SciTech Connect (OSTI)

    Dennis Hill; Kurt Swenson; Carl Tuura; Jim Simon; Robert Vermette; Gilberto Marcha; Steve Kelly; David Wells; Ed Palmer; Kuo Yu; Tram Nguyen; Juliam Migliavacca

    2011-01-05T23:59:59.000Z

    According to a 2008 report issued by the United States Geological Survey, North Dakota and Montana have an estimated 3.0 to 4.3 billion barrels of undiscovered, technically recoverable oil in an area known as the Bakken Formation. With the size and remoteness of the discovery, the question became 'can a business case be made for increasing refining capacity in North Dakota?' And, if so what is the impact to existing players in the region. To answer the question, a study committee comprised of leaders in the region's petroleum industry were brought together to define the scope of the study, hire a consulting firm and oversee the study. The study committee met frequently to provide input on the findings and modify the course of the study, as needed. The study concluded that the Petroleum Area Defense District II (PADD II) has an oversupply of gasoline. With that in mind, a niche market, naphtha, was identified. Naphtha is used as a diluent used for pipelining the bitumen (heavy crude) from Canada to crude markets. The study predicted there will continue to be an increase in the demand for naphtha through 2030. The study estimated the optimal configuration for the refinery at 34,000 barrels per day (BPD) producing 15,000 BPD of naphtha and a 52 percent refinery charge for jet and diesel yield. The financial modeling assumed the sponsor of a refinery would invest its own capital to pay for construction costs. With this assumption, the internal rate of return is 9.2 percent which is not sufficient to attract traditional investment given the risk factor of the project. With that in mind, those interested in pursuing this niche market will need to identify incentives to improve the rate of return.

  17. ChemCam all-women's operations day

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccessAlamosCharacterization of SelectiveBrown GraduateChemCam

  18. Summary, Attendee Input, and Day 1 Wrap Up

    Broader source: Energy.gov [DOE]

    Summary and wrap up of day 1 presentations and preview of day 2 by DOE Integrated Safety Management Co-champions Patricia R. Worthington, HSS Director, Office of Health and Safety; and and Ray J. Corey, Assistant Manager for Safety and Environment, DOE Richland Operations Office.

  19. Innovative Manufacturing Initiative Recognition Day

    Broader source: Energy.gov [DOE]

    The Innovative Manufacturing Initiative (IMI) Recognition Day (held in Washington, DC on June 20, 2012) showcased IMI projects selected by the Energy Department to help American manufacturers...

  20. Earth Day 2014 Photo Contest

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Earth Day 2014 Photo Contest CALLING ALL PHOTOGRAPHERS Professionals, amateurs, and the camera sharp shooter We invite all DOE employees and DOE contractors to share images of...

  1. George Washington Carver Recognition Day

    Broader source: Energy.gov [DOE]

    In commemoration of George Washington Carver’s life and work, Congress declared January 5 as George Washington Carver Recognition Day.

  2. Ingestive and digestive capacity of peritoneal macrophages from mice exposed to hypobaric hypoxia

    E-Print Network [OSTI]

    Irving, George Washington

    1970-01-01T23:59:59.000Z

    . Exposure for 19 to 29 days resulted in lower ingestion of the microorganism by the peritoneal macrophages. Upon return of mice to ambient conditions after 14 days exposure to the simulated altitude environment, peritoneal cells exhibited an initial... increase in ingestive capacity. The phagocytic ability was lowered following continuous ambient exposure for 4 and 8 days, but after continued exposure to the ambient conditions for 15 days the ingestive efficiency of the peritoneal cells was nearly...

  3. UMIC DAY`11 Aachen, Germany

    E-Print Network [OSTI]

    Kobbelt, Leif

    UMIC DAY`11 Aachen, Germany UMIC Ultra High-Speed Mobile Information and Communication Cluster-level research October 18 , 2011th UMICResearchCentre Dr.UteMüller RWTHAachenUniversity 52056AACHEN GERMANY Ultra University. UMIC Day`11 October 18 , 2011 Super C, 6 floor Templergraben 57 Aachen, Germany th th company

  4. How Do You Observe Earth Day Every Day? | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Observe Earth Day Every Day? How Do You Observe Earth Day Every Day? April 23, 2009 - 1:44pm Addthis Yesterday was officially Earth Day, but really, every day should be Earth Day....

  5. Development of a high capacity longwall conveyor. Final technical report

    SciTech Connect (OSTI)

    Sparks, C

    1982-05-01T23:59:59.000Z

    The objectives of this program were to develop, fabricate, and demonstrate a longwall conveying system capable of transporting coal at a rate of 9000 tons/day (1000 tons/hr) and capable of accommodating a surge rate of 20 tons/min. The equipment was required to have the structural durability to perform with an operating availability of 90%. A review of available literature and discussions with longwall operators identified the problem areas of conveyor design that required attention. The conveyor under this contract was designed and fabricated with special attention given to these areas, and also to be easily maintainable. The design utilized twin 300 hp drives and twin inboard 26-mm chain at 270 ft/min; predictions of capacity and reliability based on the design indicating that it would satisfy the program requirements. Conveyor components were critically tested and the complete conveyor was surface-tested, the results verifying the design specifications. In addition, an instrumentation system was developed with analysis by computer techniques to monitor the performance of the conveyor. The conveyor was installed at a selected mine site, and it was the intention to monitor its performance over the entire longwall panel. Monitoring of the conveyor performance was conducted over approximately one-third of the longwall panel, at which point further effort was suspended. However, during the monitored period, data collected from various sources showed the conveyor to have exhibited its capability of transporting coal at the desired rate, and also to have conformed to the program requirements of reliability and availability.

  6. Earth Day 2014 | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Day 2014 Earth Day 2014 Earth Day 2014 This year, we're celebrating Earth Day all week long. It's Earth Week on Energy.gov We're focusing on climate change, highlighting Earth Day...

  7. Integral Fluxes, Day-Night, and Spectrum Results from SNO's 391-Day Salt Phase

    E-Print Network [OSTI]

    Juergen Wendland; for the SNO collaboration

    2005-07-12T23:59:59.000Z

    The Sudbury Neutrino Observatory is a 1000t heavy water Cherenkov detector observing neutrinos from the Sun and other astrophysical sources. Measurements of the integral solar neutrino fluxes of charged current, neutral current and elastic scattering events are reported for 391 days of live data from the salt phase of SNO operation. In this phase 2t of salt were dissolved in the heavy water, which enhanced and differentiated the detection of neutral current events. Day-night asymmetries in these fluxes were also determined. The measured electron spectrum from the charged-current channel is compatible with the undistorted spectrum of the solar 8B neutrino flux.

  8. Tri-Laboratory Linux Capacity Cluster 2007 SOW

    SciTech Connect (OSTI)

    Seager, M

    2007-03-22T23:59:59.000Z

    The Advanced Simulation and Computing (ASC) Program (formerly know as Accelerated Strategic Computing Initiative, ASCI) has led the world in capability computing for the last ten years. Capability computing is defined as a world-class platform (in the Top10 of the Top500.org list) with scientific simulations running at scale on the platform. Example systems are ASCI Red, Blue-Pacific, Blue-Mountain, White, Q, RedStorm, and Purple. ASC applications have scaled to multiple thousands of CPUs and accomplished a long list of mission milestones on these ASC capability platforms. However, the computing demands of the ASC and Stockpile Stewardship programs also include a vast number of smaller scale runs for day-to-day simulations. Indeed, every 'hero' capability run requires many hundreds to thousands of much smaller runs in preparation and post processing activities. In addition, there are many aspects of the Stockpile Stewardship Program (SSP) that can be directly accomplished with these so-called 'capacity' calculations. The need for capacity is now so great within the program that it is increasingly difficult to allocate the computer resources required by the larger capability runs. To rectify the current 'capacity' computing resource shortfall, the ASC program has allocated a large portion of the overall ASC platforms budget to 'capacity' systems. In addition, within the next five to ten years the Life Extension Programs (LEPs) for major nuclear weapons systems must be accomplished. These LEPs and other SSP programmatic elements will further drive the need for capacity calculations and hence 'capacity' systems as well as future ASC capability calculations on 'capability' systems. To respond to this new workload analysis, the ASC program will be making a large sustained strategic investment in these capacity systems over the next ten years, starting with the United States Government Fiscal Year 2007 (GFY07). However, given the growing need for 'capability' systems as well, the budget demands are extreme and new, more cost effective ways of fielding these systems must be developed. This Tri-Laboratory Linux Capacity Cluster (TLCC) procurement represents the ASC first investment vehicle in these capacity systems. It also represents a new strategy for quickly building, fielding and integrating many Linux clusters of various sizes into classified and unclassified production service through a concept of Scalable Units (SU). The programmatic objective is to dramatically reduce the overall Total Cost of Ownership (TCO) of these 'capacity' systems relative to the best practices in Linux Cluster deployments today. This objective only makes sense in the context of these systems quickly becoming very robust and useful production clusters under the crushing load that will be inflicted on them by the ASC and SSP scientific simulation capacity workload.

  9. INFORMATION CAPACITY AND POWER EFFICIENCY IN OPERATIONAL TRANSCONDUCTANCE AMPLIFIERS

    E-Print Network [OSTI]

    Maryland at College Park, University of

    is minimal. Using principles of low power circuit design and information theory, we present a method for particular applications. Examples of such systems include amplifiers recording signals from sensors from basic noise theory that semiconductor device noise is concentrated at these low frequencies

  10. U.S. Production Capacity of Operable Petroleum Refineries

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial and Institutional UsersDecadeYearThousandW W W WDay,

  11. U.S. Total Shell Storage Capacity at Operable Refineries

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial and InstitutionalArea: U.S.Feet) WorkingArea: U.S.

  12. U.S. Working Storage Capacity at Operable Refineries

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial and InstitutionalArea: U.S.Feet)Weekly ProductArea:

  13. Capacity additions ease tight methanol supply

    SciTech Connect (OSTI)

    Greek, B.F. (C and EN, Houston, TX (US))

    1988-10-03T23:59:59.000Z

    Two menthanol plants now in operation - one in the U.S., the other in Chile - will boost global supplies of methanol more than 375 million gal annually. This large capacity addition and smaller expansions in other parts of the world will exceed demand growth during 1988 and 1989, easing the squeeze on supplies. As the result of increased supplies, methanol prices could slip slightly in the fourth quarter. They are more likely to decline next year, however. The two plants, which started up in August, are owned and operated by Tenneco Oil Co. Processing and Marketing and by Cape Horn Methanol (CHM). The Tenneco plant, located in Pasadena, Tex., was restarted after a shutdown in 1982 when prices for methanol were low. It now is running at full capacity of 125 million gal per year. The plant uses the low-pressure process technology of Lurgi, reportedly requiring for feedstock and energy between 100,000 and 125,000 cu ft of methane per gallon. Global trade in methanol smooths out the supply and demand inconsistencies. Surging methanol demand in the U.S. and in Western Europe has been met by imports from areas where methanol production is most economical - that is, where natural gas is readily available and has no other application as high in value. Canada, Chile, and Trinidad are examples of those areas.

  14. Operation of Concentrating Solar Power Plants in the Western Wind and Solar Integration Phase 2 Study

    SciTech Connect (OSTI)

    Denholm, P.; Brinkman, G.; Lew, D.; Hummon, M.

    2014-05-01T23:59:59.000Z

    The Western Wind and Solar Integration Study (WWSIS) explores various aspects of the challenges and impacts of integrating large amounts of wind and solar energy into the electric power system of the West. The phase 2 study (WWSIS-2) is one of the first to include dispatchable concentrating solar power (CSP) with thermal energy storage (TES) in multiple scenarios of renewable penetration and mix. As a result, it provides unique insights into CSP plant operation, grid benefits, and how CSP operation and configuration may need to change under scenarios of increased renewable penetration. Examination of the WWSIS-2 results indicates that in all scenarios, CSP plants with TES provides firm system capacity, reducing the net demand and the need for conventional thermal capacity. The plants also reduced demand during periods of short-duration, high ramping requirements that often require use of lower efficiency peaking units. Changes in CSP operation are driven largely by the presence of other solar generation, particularly PV. Use of storage by the CSP plants increases in the higher solar scenarios, with operation of the plant often shifted to later in the day. CSP operation also becomes more variable, including more frequent starts. Finally, CSP output is often very low during the day in scenarios with significant PV, which helps decrease overall renewable curtailment (over-generation). However, the configuration studied is likely not optimal for High Solar Scenario implying further analysis of CSP plant configuration is needed to understand its role in enabling high renewable scenarios in the Western United States.

  15. Spent nuclear fuel project design basis capacity study

    SciTech Connect (OSTI)

    Cleveland, K.J.

    1996-09-09T23:59:59.000Z

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. Alternative configurations, sub-system cycle times, and operating scenarios were tested to identify their impact on total project duration and equipment requirements.

  16. : Measurement of Battery Capacity in Mobile Robot Systems

    E-Print Network [OSTI]

    Breu, Ruth

    . These enhancements pose demanding operation conditions on the battery, emphasizing the importance of this com- ponentRoBM2 : Measurement of Battery Capacity in Mobile Robot Systems Nestor Lucas1 , Cosmin Codrea1. With battery driven robot systems performing very sophisti- cated tasks, increasing demands on the power supply

  17. Capacity Allocation and Pricing Strategies for Wireless Femtocell Services

    E-Print Network [OSTI]

    Duan, Lingjie; Huang, Jianwei

    2012-01-01T23:59:59.000Z

    Indoor cell phone users often suffer from poor connectivity. One promising solution, femtocell technology, has been rapidly developed and deployed over the past few years. One of the biggest challenges for femtocell deployment is lack of a clear business model. This paper investigates the economic incentive for the cellular operator (also called macrocell operator) to enable femtocell service by leasing spectrum resource to an independent femtocell operator. On the one hand, femtocell services can increase communication service quality and thus increase the efficiency of the spectrum resource. On the other hand, femtocell services may introduce more competition to the market. We model the interactions between a macrocell operator, a femtocell operator, and users as a three-stage dynamic game, and derive the equilibrium pricing and capacity allocation decisions. We show that when spectrum resources are very limited, the macrocell operator has incentive to lease spectrum to femtocell operators, as femtocell ser...

  18. Vice President Biden Kicks Off Five Days of Earth Day Activities...

    Office of Environmental Management (EM)

    Kicks Off Five Days of Earth Day Activities with Announcement of Major New Energy Efficiency Effort Vice President Biden Kicks Off Five Days of Earth Day Activities with...

  19. 2014 Earth Day | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Earth Day 2014 Argonne Earth Day event 1 of 43 2014 Argonne Earth Day event As part of the lab's April 22, 2014 Earth Day celebration, children from Argonne's Child Development...

  20. SPIDERS Joint Capability Technology Demonstration Industry Day...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SPIDERS Joint Capability Technology Demonstration Industry Day Presentations SPIDERS Joint Capability Technology Demonstration Industry Day Presentations Presentations from the...

  1. "ALON ISRAEL OIL COMPANY LTD",820,15,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocksa. AppliancesTotal" "(Data from

  2. ONE DAY ON SHAPE OPTIMIZATION

    E-Print Network [OSTI]

    Ceragioli, Francesca

    ONE DAY ON SHAPE OPTIMIZATION Tuesday November 17, 2009 Aula Buzano - Dipartimento di Matematica to "Shape Optimization", a very active research field which combines techniques from several areas of mathematics to set out and solve problems where the optimal shape of an object has to be determined, in order

  3. Kampung Capacity Local Solutions for

    E-Print Network [OSTI]

    Kammen, Daniel M.

    utility customers. Using a hybrid energy resource optimization framework, we explore optimal configurationKampung Capacity Local Solutions for Sustainable Rural Energy in the Baram River Basin, Sarawak Energy Laboratory (RAEL) & Energy and Resources Group and Goldman School of Public Policy Release Date

  4. Data aggregation for capacity management

    E-Print Network [OSTI]

    Lee, Yong Woo

    2004-09-30T23:59:59.000Z

    This thesis presents a methodology for data aggregation for capacity management. It is assumed that there are a very large number of products manufactured in a company and that every product is stored in the database with its standard unit per hour...

  5. Additivity of Entangled Channel Capacity for Quantum Input States

    E-Print Network [OSTI]

    V. P. Belavkin; X. Dai

    2007-02-10T23:59:59.000Z

    An elementary introduction into algebraic approach to unified quantum information theory and operational approach to quantum entanglement as generalized encoding is given. After introducing compound quantum state and two types of informational divergences, namely, Araki-Umegaki (a-type) and of Belavkin-Staszewski (b-type) quantum relative entropic information, this paper treats two types of quantum mutual information via entanglement and defines two types of corresponding quantum channel capacities as the supremum via the generalized encodings. It proves the additivity property of quantum channel capacities via entanglement, which extends the earlier results of V. P. Belavkin to products of arbitrary quantum channels for quantum relative entropy of any type.

  6. Capacity and Energy Cost of Information in Biological and Silicon Photoreceptors

    E-Print Network [OSTI]

    Maryland at College Park, University of

    Capacity and Energy Cost of Information in Biological and Silicon Photoreceptors PAMELA ABSHIRE of infor- mation capacity (in bits per second) versus energy cost of infor- mation (in joules per bit levels of abstraction. At the functional level, we ex- amine the operational and task specification

  7. Argonne's 2012 Earth Day Event

    SciTech Connect (OSTI)

    None

    2012-01-01T23:59:59.000Z

    Argonne's 2012 Earth Day event drew crowds from across the laboratory. Argonne and U.S. Department of Energy employees toured booths and interactive displays set up by Argonne programs and clubs. Several of Argonne's partners participated, including U.S. Department of Energy, University of Chicago, Abri Credit Union, DuPage County Forest Preserve, DuPage Water Commission, PACE and Morton Arboretum. Argonne scientists and engineers also participated in a poster session, discussing their clean energy research.

  8. Argonne's 2012 Earth Day Event

    ScienceCinema (OSTI)

    None

    2013-04-19T23:59:59.000Z

    Argonne's 2012 Earth Day event drew crowds from across the laboratory. Argonne and U.S. Department of Energy employees toured booths and interactive displays set up by Argonne programs and clubs. Several of Argonne's partners participated, including U.S. Department of Energy, University of Chicago, Abri Credit Union, DuPage County Forest Preserve, DuPage Water Commission, PACE and Morton Arboretum. Argonne scientists and engineers also participated in a poster session, discussing their clean energy research.

  9. Estimation of Arrival-Departure Capacity Tradeoffs in Multi-Airport Systems

    E-Print Network [OSTI]

    Balakrishnan, Hamsa

    The accurate estimation of airport capacity is critical for the efficient planning of landing and takeoff operations, and the mitigation of congestion-induced delays. The analysis of tradeoffs between arrival and departure ...

  10. Plug and Process Loads Capacity and Power Requirements Analysis

    SciTech Connect (OSTI)

    Sheppy, M.; Gentile-Polese, L.

    2014-09-01T23:59:59.000Z

    This report addresses gaps in actionable knowledge that would help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. Limited initial data, however, suggest that actual PPL densities in leased buildings are substantially lower. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems. Better guidance will enable improved sizing and design of these systems, decrease upfront capital costs, and allow systems to operate more energy efficiently. The main focus of this report is to provide industry with reliable, objective third-party guidance to address the information gap in typical PPL densities for commercial building tenants. This could drive changes in negotiations about PPL energy demands.

  11. High capacity immobilized amine sorbents

    DOE Patents [OSTI]

    Gray, McMahan L. (Pittsburgh, PA); Champagne, Kenneth J. (Fredericktown, PA); Soong, Yee (Monroeville, PA); Filburn, Thomas (Granby, CT)

    2007-10-30T23:59:59.000Z

    A method is provided for making low-cost CO.sub.2 sorbents that can be used in large-scale gas-solid processes. The improved method entails treating an amine to increase the number of secondary amine groups and impregnating the amine in a porous solid support. The method increases the CO.sub.2 capture capacity and decreases the cost of utilizing an amine-enriched solid sorbent in CO.sub.2 capture systems.

  12. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30T23:59:59.000Z

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

  13. Pi Day of the Century

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPOPetroleum ReservesThrust Areas Physics161 ThisPi Day of

  14. Museum Day at Bradbury Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighandSWPA / SPRA /Ml'.SolarUSAdvancedMuseum Day at Bradbury Science

  15. Celebrate Earth Day! | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Earth Day Celebrate Earth Day April 20, 2010 - 10:25am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory Earth Day is a great time to commit...

  16. Joint Capability Technology Demonstration (JCTD) Industry Day...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Joint Capability Technology Demonstration (JCTD) Industry Day Agenda Joint Capability Technology Demonstration (JCTD) Industry Day Agenda Agenda outlines the activities of the 2014...

  17. Determining Optimal Equipment Capacities in Cooling, Heating and Power (CHP) Systems

    SciTech Connect (OSTI)

    DeVault, Robert C [ORNL; Hudson II, Carl Randy [ORNL

    2006-01-01T23:59:59.000Z

    Evaluation of potential cooling, heating and power (CHP) applications requires an assessment of the operations and economics of a particular system in meeting the electric and thermal demands of a specific end-use facility. A key determinate in whether a candidate system will be economic is the proper selection of equipment capacities. A methodology to determine the optimal capacities for CHP prime movers and absorption chillers using nonlinear optimization algorithms has been coded into a Microsoft Excel spreadsheet tool that performs the capacity optimization and operations simulation. This paper presents details on the use and results of this publicly available tool.

  18. Summary, Attendee Input, and Final Day 2 Wrap up

    Broader source: Energy.gov [DOE]

    Summary and wrap up by DOE Integrated Safety Management Co-champions Patricia R. Worthington, HSS Director, Office of Health and Safety; and and Ray J. Corey, Assistant Manager for Safety and Environment, DOE Richland Operations Office of day 2 presentations and discussions.

  19. Capacity expansion in contemporary telecommunication networks

    E-Print Network [OSTI]

    Sivaraman, Raghavendran

    2007-01-01T23:59:59.000Z

    We study three capacity expansion problems in contemporary long distance telecommunication networks. The first two problems, motivated by a major long distance provider, address capacity expansion in national hybrid long ...

  20. Neural substrates of cognitive capacity limitations

    E-Print Network [OSTI]

    Buschman, Tim

    Cognition has a severely limited capacity: Adult humans can retain only about four items “in mind”. This limitation is fundamental to human brain function: Individual capacity is highly correlated with intelligence measures ...

  1. FURTHER EXPERIMENTS IN FISHWAY CAPACITY, 1957

    E-Print Network [OSTI]

    capacity trials 7 Maximum entry and exit 7 Entry capacity 8 Maximum number of fish present in the fishway 8 on 16 and a mean depth of 6. 3 feet. Maximum observed entry and exit of salmonids are discussed

  2. Voluntary Initiative: Partnering to Enhance Program Capacity...

    Energy Savers [EERE]

    to Enhance Program Capacity Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Voluntary Initiative: Partnering to Enhance Program...

  3. Can Science and Technology Capacity be Measured?

    E-Print Network [OSTI]

    Wagner, Caroline S; Dutta, Arindum

    2015-01-01T23:59:59.000Z

    The ability of a nation to participate in the global knowledge economy depends to some extent on its capacities in science and technology. In an effort to assess the capacity of different countries in science and technology, this article updates a classification scheme developed by RAND to measure science and technology capacity for 150 countries of the world.

  4. Spent nuclear fuel project design basis capacity study

    SciTech Connect (OSTI)

    Cleveland, K.J.

    1998-07-22T23:59:59.000Z

    A parametric study of the Spent Nuclear Fuel Project system capacity is presented. The study was completed using a commercially available software package to develop a summary level model of the major project systems. A base case, reflecting the Fiscal Year 1998 process configuration, is evaluated. Parametric evaluations are also considered, investigating the impact of higher fuel retrieval system productivity and reduced shift operations at the canister storage building on total project duration.

  5. Making the Traffic Operations Case for Congestion Pricing: Operational Impacts of Congestion Pricing

    SciTech Connect (OSTI)

    Chin, Shih-Miao [ORNL; Hu, Patricia S [ORNL; Davidson, Diane [ORNL

    2011-02-01T23:59:59.000Z

    Congestion begins when an excess of vehicles on a segment of roadway at a given time, resulting in speeds that are significantly slower than normal or 'free flow' speeds. Congestion often means stop-and-go traffic. The transition occurs when vehicle density (the number of vehicles per mile in a lane) exceeds a critical level. Once traffic enters a state of congestion, recovery or time to return to a free-flow state is lengthy; and during the recovery process, delay continues to accumulate. The breakdown in speed and flow greatly impedes the efficient operation of the freeway system, resulting in economic, mobility, environmental and safety problems. Freeways are designed to function as access-controlled highways characterized by uninterrupted traffic flow so references to freeway performance relate primarily to the quality of traffic flow or traffic conditions as experienced by users of the freeway. The maximum flow or capacity of a freeway segment is reached while traffic is moving freely. As a result, freeways are most productive when they carry capacity flows at 60 mph, whereas lower speeds impose freeway delay, resulting in bottlenecks. Bottlenecks may be caused by physical disruptions, such as a reduced number of lanes, a change in grade, or an on-ramp with a short merge lane. This type of bottleneck occurs on a predictable or 'recurrent' basis at the same time of day and same day of week. Recurrent congestion totals 45% of congestion and is primarily from bottlenecks (40%) as well as inadequate signal timing (5%). Nonrecurring bottlenecks result from crashes, work zone disruptions, adverse weather conditions, and special events that create surges in demand and that account for over 55% of experienced congestion. Figure 1.1 shows that nonrecurring congestion is composed of traffic incidents (25%), severe weather (15%), work zones, (10%), and special events (5%). Between 1995 and 2005, the average percentage change in increased peak traveler delay, based on hours spent in traffic in a year, grew by 22% as the national average of hours spent in delay grew from 36 hours to 44 hours. Peak delay per traveler grew one-third in medium-size urban areas over the 10 year period. The traffic engineering community has developed an arsenal of integrated tools to mitigate the impacts of congestion on freeway throughput and performance, including pricing of capacity to manage demand for travel. Congestion pricing is a strategy which dynamically matches demand with available capacity. A congestion price is a user fee equal to the added cost imposed on other travelers as a result of the last traveler's entry into the highway network. The concept is based on the idea that motorists should pay for the additional congestion they create when entering a congested road. The concept calls for fees to vary according to the level of congestion with the price mechanism applied to make travelers more fully aware of the congestion externality they impose on other travelers and the system itself. The operational rationales for the institution of pricing strategies are to improve the efficiency of operations in a corridor and/or to better manage congestion. To this end, the objectives of this project were to: (1) Better understand and quantify the impacts of congestion pricing strategies on traffic operations through the study of actual projects, and (2) Better understand and quantify the impacts of congestion pricing strategies on traffic operations through the use of modeling and other analytical methods. Specifically, the project was to identify credible analytical procedures that FHWA can use to quantify the impacts of various congestion pricing strategies on traffic flow (throughput) and congestion.

  6. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: OATI (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  7. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

  8. Capacity fade of Sony 18650 cells cycled at elevated temperatures Part II. Capacity fade analysis

    E-Print Network [OSTI]

    Popov, Branko N.

    Capacity fade of Sony 18650 cells cycled at elevated temperatures Part II. Capacity fade analysis P August 2002 Abstract A complete capacity fade analysis was carried out for Sony 18650 cells cycled the other losses. # 2002 Elsevier Science B.V. All rights reserved. Keywords: Capacity fade; Sony 18650

  9. Survey and conceptual flow sheets for coal conversion plant handling-preparation and ash/slag removal operations

    SciTech Connect (OSTI)

    Zapp, F.C.; Thomas, O.W.; Silverman, M.D.; Dyslin, D.A.; Holmes, J.M.

    1980-03-01T23:59:59.000Z

    This study was undertaken at the request of the Fossil Fuel Processing Division of the Department of Energy. The report includes a compilation of conceptual flow sheets, including major equipment lists, and the results of an availability survey of potential suppliers of equipment associated with the coal and ash/slag operations that will be required by future large coal conversion plant complexes. Conversion plant flow sheet operations and related equipment requirements were based on two representative bituminous coals - Pittsburgh and Kentucky No. 9 - and on nine coal conversion processes. It appears that almost all coal handling and preparation and ash/slag removal equipment covered by this survey, with the exception of some coal comminution equipment, either is on hand or can readily be fabricated to meet coal conversion plant capacity requirements of up to 50,000 short tons per day. Equipment capable of handling even larger capacities can be developed. This approach appears to be unjustified, however, because in many cases a reasonable or optimum number of trains of equipment must be considered when designing a conversion plant complex. The actual number of trains of equipment selected will be influenced by the total requied capacity of the complex, the minimum on-line capacity that can be tolerated in case of equipment failure, reliability of specific equipment types, and the number of reactors and related feed injection stations needed for the specific conversion process.

  10. SHUTTLE MENU STS-135 Stow By Day

    E-Print Network [OSTI]

    *Day 1 consists of Meal C only **Day 13 consists of Meals A & B only (B) - Beverage, (FF)- Fresh Food, (I) - Irradiated, (IM) - Intermediate Moisture, (NF) - Natural Form, (R) - Rehydratable, (T

  11. AFBC - operation of small scale demonstration for greenhouse heating

    SciTech Connect (OSTI)

    Ashworth, R.A.; Plessinger, D.A.; Webner, R.L.; Machamer, T.

    1996-12-31T23:59:59.000Z

    A 2.2 million Btu/hr unit prototype AFBC system was installed in 1995 at Cedar Lane Farms, a commercial nursery in Ohio. The AFBC is in operation and is heating hot water for greenhouse temperature control. A team consisting of the Energy and Environmental Research Corporation, the Ohio Agricultural Research and Development Center of Ohio State University and the Will-Burt Company developed this technology with funding support from the Ohio Coal Development Office and the U.S. Department of Energy. The system is fully automated with little operator attention being required. Operating experience at Cedar Lane Farms has shown that only 2 hours per day of operation attention is required for the system. The system includes flyash/sorbent reinjection and underbed coal/limestone feed. These features provide for good limestone utilization; a Ca/S (in coal) ratio of 2.5 will maintain an SO{sub 2} emissions level of 1.2 lb/10{sup 6} Btu when burning high sulfur (3.2%) Ohio coal. A baghouse is used to control particulate emissions. Based on the success of the prototype unit, a design has been recently completed for a commercial size 10 x 10{sup 6} Btu/hr capacity range. Multiple AFBC units can be used to provide larger heat outputs. Potential coal-fired AFBC users include institutions (schools, hospitals, prisons, government), light industry (agricultural, food processing), commercial users (shopping centers), and large residential users (apartment complexes). 6 figs., 1 tab.

  12. Geyserville: 1000 Feet in 110 Days

    E-Print Network [OSTI]

    Morton, Chuck; Cashin, Charlotte

    2007-01-01T23:59:59.000Z

    total of 110 days. Extensive coordination with the resource agencies (Army Corps of Engineers, Regional Water Quality Control

  13. Business Day Authoritative, informative and timely,

    E-Print Network [OSTI]

    Peters, Richard

    Overview #12;Business Day Overview Authoritative, informative and timely, Business Day is a must read for business decision-makers. Business Day has Australia's most influential business writers and commentators who provide up-to-the- minute business news, including context, background and specialist analysis

  14. ScheduleDay 1: Molecular Evolution Introduction

    E-Print Network [OSTI]

    Goldschmidt, Christina

    -Cantor Model Do Exercise Read Ponting, study slides from day 3 and find questions. Day 3: Comparative Genomics Lecture: Comparative Genomics Prepare Projects Practical: Models of Sequence Evolution Read HSW1, study questions. Day 10: Projects Project 1 ­ Population Genomics: Selective Sweeps Project 2 ­ Molecular

  15. Operators eye closer service relationships

    SciTech Connect (OSTI)

    Deffarges, E.H.; Ellis, P.A. (Booz Allen Hamilton Inc., Paris (France)); McArthur, N.C. (Booz Allen Hamilton Inc., Wassenaar (Netherlands))

    1994-09-19T23:59:59.000Z

    The use of integrated drilling services and alliance-type contracts has become economical and more practicable for many operators and service companies world-wide. The alliance-type contract provides a better balance of risks and rewards shared equally among all operator and contractor parties than many standard day rate and turnkey contracts. The general trend toward longer term contracts with fewer supply companies has helped numerous operators remain competitive. The paper discusses the trend toward increased partnerships and fewer suppliers.

  16. Increasing water holding capacity for irrigation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Increasing water holding capacity for irrigation Reseachers recommend solutions for sediment trapping in irrigation system LANL and SNL leveraged technical expertise to determine...

  17. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide Energy Efficiency Action...

  18. Quantum Capacities of Channels with small Environment

    E-Print Network [OSTI]

    Michael M. Wolf; David Perez-Garcia

    2006-07-11T23:59:59.000Z

    We investigate the quantum capacity of noisy quantum channels which can be represented by coupling a system to an effectively small environment. A capacity formula is derived for all cases where both system and environment are two-dimensional--including all extremal qubit channels. Similarly, for channels acting on higher dimensional systems we show that the capacity can be determined if the channel arises from a sufficiently small coupling to a qubit environment. Extensions to instances of channels with larger environment are provided and it is shown that bounds on the capacity with unconstrained environment can be obtained from decompositions into channels with small environment.

  19. Building a Sustainable Future FACILITIES & OPERATIONS

    E-Print Network [OSTI]

    Building a Sustainable Future FACILITIES & OPERATIONS #12;A Laboratory on a Mission ...to meet: The Environmental Technology Building and National Security Building house more than 650 staff members. #12;Pacific capacity "The Facilities & Operations organization is dedicated to safely and sustainably building

  20. Great Lakes ports coal handling capacity and export coal potential

    SciTech Connect (OSTI)

    Ames, A.H. Jr.

    1981-02-01T23:59:59.000Z

    This study was developed to determine the competitive position of the Great Lakes Region coal-loading ports in relation to other US coastal ranges. Due to the congestion at some US Atlantic coastal ports US coal producers have indicated a need for alternative export routes, including the Great Lakes-St. Lawrence Seaway System. The study assesses the regions coal handling capacity and price competitiveness along with the opportunity for increased US flag vessel service. A number of appendices are included showing major coal producers, railroad marketing representatives, US vessel operators, and port handling capacities and throughput. A rate analysis is provided including coal price at the mine, rail rate to port, port handling charges, water transportation rates to western Europe, Great Lakes route versus the US Atlantic Coast ports.

  1. Waste treatment capacity of raft hydroponic lettuce production in an integrated fish culture system and the contribution of lettuce to treatment capacity

    E-Print Network [OSTI]

    Gloger, Kelly C

    1995-01-01T23:59:59.000Z

    water sample when incubated at 20 C over a five day period. COD Chemical oxygen demand ? a test which detamines the amount of oxygen need to oxidize both organic and inorganic material in a water sample. TSS Total suspended solids ? all particulate... volume per day (Wyban and Sweeney, 1991). The environmental impact of the discharge of nutrient laden gow strength) wastewater from aquaculture operations to natural receiving water is of concern and will be a challenge for future commercial operations...

  2. Integrating science, environmental education, public outreach, conservation, and capacity-building through hands-on bird ecology

    E-Print Network [OSTI]

    Tipple, Brett

    Integrating science, environmental education, public outreach, conservation, and capacity and conservation. We welcome and encourage participation by visitors to Rio Mesa in our bird banding operations environmental indicators, are relatively easy to monitor, and as charismatic flagship species, are met

  3. Mitochondrial Respiratory Capacity Is a Critical Regulator

    E-Print Network [OSTI]

    respiratory capacity (SRC). SRC is the extra capacity available in cells to produce energy in response. In response to antigen (Ag) and costimulation, CD8+ T cells undergo a developmental program characterized- ating in response to Ag, it is thought that quiescent T cells (e.g., naive and memory T cells), like

  4. REDUCTION CAPACITY OF SALTSTONE AND SALTSTONE COMPONENTS

    SciTech Connect (OSTI)

    Roberts, K.; Kaplan, D.

    2009-11-30T23:59:59.000Z

    The duration that saltstone retains its ability to immobilize some key radionuclides, such as technetium (Tc), plutonium (Pu), and neptunium (Np), depends on its capacity to maintain a low redox status (or low oxidation state). The reduction capacity is a measure of the mass of reductants present in the saltstone; the reductants are the active ingredients that immobilize Tc, Pu, and Np. Once reductants are exhausted, the saltstone loses its ability to immobilize these radionuclides. The reduction capacity values reported here are based on the Ce(IV)/Fe(II) system. The Portland cement (198 {micro}eq/g) and especially the fly ash (299 {micro}eq/g) had a measurable amount of reduction capacity, but the blast furnace slag (820 {micro}eq/g) not surprisingly accounted for most of the reduction capacity. The blast furnace slag contains ferrous iron and sulfides which are strong reducing and precipitating species for a large number of solids. Three saltstone samples containing 45% slag or one sample containing 90% slag had essentially the same reduction capacity as pure slag. There appears to be some critical concentration between 10% and 45% slag in the Saltstone formulation that is needed to create the maximum reduction capacity. Values from this work supported those previously reported, namely that the reduction capacity of SRS saltstone is about 820 {micro}eq/g; this value is recommended for estimating the longevity that the Saltstone Disposal Facility will retain its ability to immobilize radionuclides.

  5. Dual capacity compressor with reversible motor and controls arrangement therefor

    DOE Patents [OSTI]

    Sisk, Francis J. (Washington Township, Fayette County, PA)

    1980-12-02T23:59:59.000Z

    A hermetic reciprocating compressor such as may be used in heat pump applications is provided for dual capacity operation by providing the crankpin of the crankshaft with an eccentric ring rotatably mounted thereon, and with the end of the connecting rod opposite the piston encompassing the outer circumference of the eccentric ring, with means limiting the rotation of the eccentric ring upon the crankpin between one end point and an opposite angularly displaced end point to provide different values of eccentricity depending upon which end point the eccentric ring is rotated to upon the crankpin, and a reversible motor in the hermetic shell of the compressor for rotating the crankshaft, the motor operating in one direction effecting the angular displacement of the eccentric ring relative to the crankpin to the one end point, and in the opposite direction effecting the angular displacement of the eccentric ring relative to the crankpin to the opposite end point, this arrangement automatically giving different stroke lengths depending upon the direction of motor rotation. The mechanical structure of the arrangement may take various forms including at least one in which any impact of reversal is reduced by utilizing lubricant passages and chambers at the interface area of the crankpin and eccentric ring to provide a dashpot effect. In the main intended application of the arrangement according to the invention, that is, in a refrigerating or air conditioning system, it is desirable to insure a delay during reversal of the direction of compressor operation. A control arrangement is provided in which the control system controls the direction of motor operation in accordance with temperature conditions, the system including control means for effecting operation in a low capacity direction or alternatively in a high capacity direction in response to one set, and another set, respectively, of temperature conditions and with timer means delaying a restart of the compressor motor for at least a predetermined time in response to a condition of the control means operative to initiate a change in the operating direction of the compressor when it restarts.

  6. Capacity Value of PV and Wind Generation in the NV Energy System

    SciTech Connect (OSTI)

    Lu, Shuai; Diao, Ruisheng; Samaan, Nader A.; Etingov, Pavel V.

    2014-03-21T23:59:59.000Z

    Calculation of photovoltaic (PV) and wind power capacity values is important for estimating additional load that can be served by new PV or wind installations in the electrical power system. It also is the basis for assigning capacity credit payments in systems with markets. Because of variability in solar and wind resources, PV and wind generation contribute to power system resource adequacy differently from conventional generation. Many different approaches to calculating PV and wind generation capacity values have been used by utilities and transmission operators. Using the NV Energy system as a study case, this report applies peak-period capacity factor (PPCF) and effective load carrying capability (ELCC) methods to calculate capacity values for renewable energy sources. We show the connection between the PPCF and ELCC methods in the process of deriving a simplified approach that approximates the ELCC method. This simplified approach does not require generation fleet data and provides the theoretical basis for a quick check on capacity value results of PV and wind generation. The diminishing return of capacity benefit as renewable generation increases is conveniently explained using the simplified capacity value approach.

  7. Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day

    E-Print Network [OSTI]

    Awtar, Shorya

    Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day A publication of U of M Waste Management Services July 2013 #12;Table of Contents What is a Green Clean Day? 2 Why have a Green Clean Day? 2 How Do We Get Started? 2 How Waste Management Services Can Help 2

  8. Innovative Manufacturing Initiative Recognition Day, Advanced...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Innovative Manufacturing Initiative Recognition Day Advanced Manufacturing Office Overview Unlocking the Potential of Additive Manufacturing in the Fuel Cells Industry...

  9. Manoa Green Days Launch July 1, 2009

    E-Print Network [OSTI]

    Wang, Yuqing

    Days in which air conditioning to participating buildings will be shutdown over the weekends, including · Radios ­ unplug · Battery chargers ­ unplug · Window air

  10. 2014 Earth Day Photo Contest Winners

    Energy Savers [EERE]

    2014 Earth Day Photo Contest Winners COMMUNITY: "Edison Home" by Gary Hartman SUSTAINABILITY: "Oak Alley" by Wade Sickinger ALTERNATIVE ENERGY: "Windmill Ablaze at Sunset" by Leroy...

  11. Evaluation of a solar intermittent refrigeration system for ice production operating with ammonia/lithium nitrate

    SciTech Connect (OSTI)

    Rivera, W.; Moreno-Quintanar, G.; Best, R. [Centro de Investigacion en Energia, Universidad Nacional Autonoma de Mexico, A.P. 34, 62580 Temixco, Mor. (Mexico); Rivera, C.O.; Martinez, F. [Facultad de Ingenieria Campus Coatzacoalcos, Universidad Veracruzana, Av. Universidad Km 7.5, 96530 Coatzacoalcos, Ver. (Mexico)

    2011-01-15T23:59:59.000Z

    A novel solar intermittent refrigeration system for ice production developed in the Centro de Investigacion en Energia of the Universidad Nacional Autonoma de Mexico is presented. The system operates with the ammonia/lithium nitrate mixture. The system developed has a nominal capacity of 8 kg of ice/day. It consists of a cylindrical parabolic collector acting as generator-absorber. Evaporator temperatures as low as -11 C were obtained for several hours with solar coefficients of performance up to 0.08. It was found that the coefficient of performance increases with the increment of solar radiation and the solution concentration. A dependency of the coefficient of performance was not founded against the cooling water temperature. Also it was found that the maximum operating pressure increases meanwhile the generation temperature decreases with an increase of the solution concentration. (author)

  12. Biological Kraft Chemical Recycle for Augmentation of Recovery Furnace Capacity

    SciTech Connect (OSTI)

    Stuart E. Strand

    2001-12-06T23:59:59.000Z

    The chemicals used in pulping of wood by the kraft process are recycled in the mill in the recovery furnace, which oxidizes organics while simultaneously reducing sulfate to sulfide. The recovery furnace is central to the economical operation of kraft pulp mills, but it also causes problems. The total pulp production of many mills is limited by the recovery furnace capacity, which cannot easily be increased. The furnace is one of the largest sources of air pollution (as reduced sulfur compounds) in the kraft pulp mill.

  13. Representation of the Solar Capacity Value in the ReEDS Capacity Expansion Model: Preprint

    SciTech Connect (OSTI)

    Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

    2014-08-01T23:59:59.000Z

    An important emerging issue is the estimation of renewables' contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to resource variability. Reliability-based methods, particularly, effective load-carrying capacity (ELCC), are considered to be the most robust techniques for addressing this resource variability. The Regional Energy Deployment System (ReEDS) capacity expansion model and other long-term electricity capacity planning models require an approach to estimating CV for generalized PV and system configurations with low computational and data requirements. In this paper we validate treatment of solar photovoltaic (PV) capacity value by ReEDS capacity expansion model by comparing model results to literature for a range of energy penetration levels. Results from the ReEDS model are found to compare well with both comparisons--despite not being resolved at an hourly scale.

  14. Pollution prevention and water conservation in metals finishing operations

    SciTech Connect (OSTI)

    O`Shaughnessy, J.; Clark, W. [Worcester Polytechnic Inst., MA (United States); Lizotte, R.P. Jr.; Mikutel, D. [Texas Instruments Inc., Attleboro, MA (United States)

    1996-11-01T23:59:59.000Z

    Attleboro, Massachusetts is the headquarters of the Materials and Controls Group of Texas Instruments Incorporated (Texas Instruments). In support of their activities, Texas Instruments operates a number of metal finishing and electroplating processes. The water supply and the wastewater treatment requirements are supplied throughout the facility from a central location. Water supply quality requirements varies with each manufacturing operation. As a result, manufacturing operations are classified as either high level or a lower water quality. The facility has two methods of wastewater treatment and disposal. The first method involves hydroxide and sulfide metals precipitation prior to discharge to a surface water. The second method involves metals precipitation, filtration, and discharge via sewer to the Attleboro WTF. The facility is limited to a maximum wastewater discharge of 460,000 gallons per day to surface water under the existing National Pollution Discharge Elimination System (NPDES) permit. There is also a hydraulic flow restriction on pretreated wastewater that is discharged to the Attleboro WTF. Both of these restrictions combined with increased production could cause the facility to reach the treatment capacity. The net effect is that wastewater discharge problems are becoming restrictive to the company`s growth. This paper reviews Texas Instruments efforts to overcome these restrictions through pollution prevention and reuse practices rather than expansion of end of pipe treatment methods.

  15. Photovoltaics effective capacity: Interim final report 2

    SciTech Connect (OSTI)

    Perez, R.; Seals, R. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1997-11-01T23:59:59.000Z

    The authors provide solid evidence, based on more than 8 million data points, that regional photovoltaic (PV) effective capacity is largely unrelated to the region`s solar resource. They confirm, however, that effective capacity is strongly related to load-shape characteristics. The load-shape effective-capacity relationship appears to be valid for end-use loads as small as 100 kW, except possibly in the case of electrically heated buildings. This relationship was used as a tool to produce a US map of PV`s effective capacity. The regions of highest effective capacities include (1) the central US from the northern Great Plains to the metropolitan areas of Chicago and Detroit, down to the lower Mississippi Valley, (2) California and western Arizona, and (3) the northeast metropolitan corridor. The features of this map are considerably different from the traditional solar resource maps. They tend to reflect the socio-economic and climatic factors that indirectly drive PV`s effective capacity: e.g., commercial air-conditioning, little use of electric heat, and strong summer heat waves. The map provides a new and significant insight to a comprehensive valuation of the PV resource. The authors assembled preliminary evidence showing that end-use load type may be related to PV`s effective capacity. Highest effective capacities were found for (nonelectrically heated) office buildings, followed by hospitals. Lowest capacities were found for airports and residences. Many more data points are needed, however, to ascertain and characterize these preliminary findings.

  16. EVALUATION OF PV GENERATION CAPICITY CREDIT FORECAST ON DAY-AHEAD UTILITY MARKETS

    E-Print Network [OSTI]

    Perez, Richard R.

    comfortable if capacity could be ascertained operationally by knowing in advance what the output of solar and satellite-derived PV data. In addition, we can decouple the uncertainty of solar radiation and load, 12203 Perez@asrc.cestm.albany,edu Kathleen Moore Integrated Environment Data 255 Fuller Road Albany, NY

  17. ,"Plant","Primary Energy Source","Operating Company","Net Summer...

    U.S. Energy Information Administration (EIA) Indexed Site

    Virginia" ,"Plant","Primary Energy Source","Operating Company","Net Summer Capacity (MW)" 1,"Bath County","Pumped Storage","Virginia Electric & Power Co",3003 2,"North...

  18. Developing Geospatial Intelligence Stewardship for Multinational Operations

    E-Print Network [OSTI]

    Thomas, Jeff

    2009-11-18T23:59:59.000Z

    , Directs reachback analysis – Improved Situational Awareness/Understanding – Greater Common Operational Picture Survey • A detailed survey to a broad multinational audience consisting of Joint, Interagency, Intergovernmental, Multinational, Industry...Developing Geospatial Intelligence Stewardship for Multinational Operations Jeff Thomas, BA, MPPA, MS Major, US Army Corps of Engineers Student, Space Operations US Army Command & General Staff College Fort Leavenworth, Kansas GIS Day @ KU Nov 18...

  19. High Capacity Pouch-Type Li-air Batteries

    SciTech Connect (OSTI)

    Wang, Deyu; Xiao, Jie; Xu, Wu; Zhang, Jiguang

    2010-05-05T23:59:59.000Z

    The pouch-type Li-air batteries operated in ambient condition are reported in this work. The battery used a heat sealable plastic membrane as package material, O2¬ diffusion membrane and moisture barrier. The large variation in internal resistance of the batteries is minimized by a modified separator which can bind the cell stack together. The cells using the modified separators show improved and repeatable discharge performances. It is also found that addition of about 20% of 1,2-dimethoxyethane (DME) in PC:EC (1:1) based electrolyte solvent improves can improve the wetability of carbon electrode and the discharge capacities of Li-air batteries, but further increase in DME amount lead to a decreased capacity due to increase electrolyte loss during discharge process. The pouch-type Li-air batteries with the modified separator and optimized electrolyte has demonstrated a specific capacity of 2711 mAh g-1 based on carbon and a specific energy of 344 Wh kg-1 based on the complete batteries including package.

  20. Day of Concern Collection / Ture Erickson (collector)

    E-Print Network [OSTI]

    Handy, Todd C.

    Day of Concern Collection / Ture Erickson (collector) Last revised October 2011 University;Collection Description Day of Concern collection / Ture Erickson (collector). ­ 1984. 6.5 cm of textual records. Collector's Biographical Sketch Born in New Westminster, Ture Erickson became Head of Sedgewick

  1. Agent Notes Day 4 ~ Health Training

    E-Print Network [OSTI]

    ­ Agent Notes Day 4 ~ Health Training In preparation for the Health Day, you could order the National Institute on Aging, National Institutes of Health. To order these free booklets, go to www in the afternoon, and edit your agenda to reflect your choices. Several HealthHints newsletters are referenced

  2. Feedback Capacity of the Compound Channel

    E-Print Network [OSTI]

    Shrader, Brooke E.

    In this work, we find the capacity of a compound finite-state channel (FSC) with time-invariant deterministic feedback. We consider the use of fixed length block codes over the compound channel. Our achievability result ...

  3. Inventories and capacity utilization in general equilibrium

    E-Print Network [OSTI]

    Trupkin, Danilo Rogelio

    2009-05-15T23:59:59.000Z

    The primary goal of this dissertation is to gain a better understanding, in thecontext of a dynamic stochastic general equilibrium framework, of the role of inventories and capacity utilization (of both capital and labor) and, in particular...

  4. Expandability, reversibility, and optimal capacity choice

    E-Print Network [OSTI]

    Dixit, Avinash K.

    1997-01-01T23:59:59.000Z

    We develop continuous-time models of capacity choice when demand fluctuates stochastically, and the firm's opportunities to expand or contract are limited. Specifically, we consider costs of investing or disinvesting that ...

  5. Developing High Capacity, Long Life Anodes

    Broader source: Energy.gov (indexed) [DOE]

    more than 1000 mAhg with poor cyleability. * The formation of Sn x Co y C z and MO composite could lead to the increase in the capacity, reduce the amount of cobalt in the...

  6. California: Conducting Polymer Binder Boosts Storage Capacity...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - 10:17am Addthis Working with Nextval, Inc., Lawrence Berkeley National Laboratory (LBNL) developed a Conducting Polymer Binder for high-capacity lithium-ion batteries. With a...

  7. Capacity Building Project with Howard University

    Broader source: Energy.gov [DOE]

    The purpose of this initiative is to build community capacity for public participation in environmental and energy decision making. The target communities are those impacted by U.S. Department of...

  8. Measuring the capacity impacts of demand response

    SciTech Connect (OSTI)

    Earle, Robert; Kahn, Edward P.; Macan, Edo

    2009-07-15T23:59:59.000Z

    Critical peak pricing and peak time rebate programs offer benefits by increasing system reliability, and therefore, reducing capacity needs of the electric power system. These benefits, however, decrease substantially as the size of the programs grows relative to the system size. More flexible schemes for deployment of demand response can help address the decreasing returns to scale in capacity value, but more flexible demand response has decreasing returns to scale as well. (author)

  9. High Electric Demand Days: Clean Energy Strategies for Improving Air Quality

    Broader source: Energy.gov [DOE]

    This presentation by Art Diem of the State and Local Capacity Building Branch in the U.S. Environmental Protection Agency was part of the July 2008 Webcast sponsored by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Clean Energy and Air Quality Integration Initiative that was titled Role of Energy Efficiency and Renewable Energy in Improving Air Quality and Addressing Greenhouse Gas Reduction Goals on High Electric Demand Days.

  10. Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01T23:59:59.000Z

    This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

  11. Air conditioning system with supplemental ice storing and cooling capacity

    DOE Patents [OSTI]

    Weng, Kuo-Lianq (Taichung, TW); Weng, Kuo-Liang (Taichung, TW)

    1998-01-01T23:59:59.000Z

    The present air conditioning system with ice storing and cooling capacity can generate and store ice in its pipe assembly or in an ice storage tank particularly equipped for the system, depending on the type of the air conditioning system. The system is characterized in particular in that ice can be produced and stored in the air conditioning system whereby the time of supplying cooled air can be effectively extended with the merit that the operation cycle of the on and off of the compressor can be prolonged, extending the operation lifespan of the compressor in one aspect. In another aspect, ice production and storage in great amount can be performed in an off-peak period of the electrical power consumption and the stored ice can be utilized in the peak period of the power consumption so as to provide supplemental cooling capacity for the compressor of the air conditioning system whereby the shift of peak and off-peak power consumption can be effected with ease. The present air conditioning system can lower the installation expense for an ice-storing air conditioning system and can also be applied to an old conventional air conditioning system.

  12. Proceedings of Hydrology Days 2002, Pages 56 63, April 1 4, 2002 Hydrology Days 2002

    E-Print Network [OSTI]

    Deinert, Mark

    Proceedings of Hydrology Days 2002, Pages 56 ­ 63, April 1 ­ 4, 2002 Hydrology Days 2002 Real radiography can be used for quantitative imaging of hydrologic phenomena at video frame rates, with great

  13. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  14. Inter-Agency Holocaust Remberance Day

    Broader source: Energy.gov [DOE]

    The ‘Days of Remembrance’ honors the six million Jews who were murdered during the Holocaust, and the five million other victims including Soviet prisoners of war, Polish Christians, physically and...

  15. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised 11-2009 30-Day Federal Register Notice - Proposed 6450-01-P DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice...

  16. 2015 Joint Capability Technology Demonstration Industry Day

    Broader source: Energy.gov [DOE]

    The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD) Phase 3 Industry Day will be on August 27, 2015, from 8 a.m. to noon at the Hawaii Convention Center.

  17. Days on market and home sales

    E-Print Network [OSTI]

    Tucker, Catherine Elizabeth

    In 2006, Massachusetts adopted a new policy that prohibits home sellers from resetting their properties’ days on market through relisting. Massachusetts homes exposed to the policy change experienced a $16,000 reduction ...

  18. SPIDERS Joint Capability Technology Demonstration Industry Day

    Broader source: Energy.gov [DOE]

    The Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD) Industry Day occurred April 22, 2014, from 8 a.m. to 1:30 p.m. at Fort Carson, Colorado.

  19. Process model and capacity upgrades of the CTI-4000 liquid helium coldbox

    SciTech Connect (OSTI)

    Hansen, Benjamin; Klebaner, Arkadiy [Fermilab, P.O. Box 500, Batavia, IL 60510 (United States); Quack, Hans [Technische Universitaet Dresden, Dresden (Germany)

    2014-01-29T23:59:59.000Z

    Fermi National Accelerator Laboratory (FNAL) is in the process of re-commissioning a vintage CTI-4000 liquid helium coldbox, initially supplied by CTI-Cryogenics/Sulzer to Los Alamos in 1979. The coldbox was originally designed as a liquid helium refrigerator with capacity of ?1200 W at nominal 4-K. The process utilized LN{sub 2} precooling, in-series operation of two centrifugal gas bearing turboexpanders and final Joule-Thomson (J-T) expansion. At FNAL, the coldbox will be utilized as a liquefier to support 2-K operations. A process model was developed to aid in the upgrade decisions and used to determine the nominal capacity of the liquefier. Capacity upgrades are achieved by safely utilizing the internal LN2 precooler, the addition of a 3-inch reciprocating wet expansion engine and increasing the overall process pressure by recertifying two limiting pressure vessels to a higher MAWP.

  20. Temporary Losses of Highway Capacity and Impacts on Performance: Phase 2

    SciTech Connect (OSTI)

    Chin, S.M.

    2004-11-10T23:59:59.000Z

    Traffic congestion and its impacts significantly affect the nation's economic performance and the public's quality of life. In most urban areas, travel demand routinely exceeds highway capacity during peak periods. In addition, events such as crashes, vehicle breakdowns, work zones, adverse weather, railroad crossings, large trucks loading/unloading in urban areas, and other factors such as toll collection facilities and sub-optimal signal timing cause temporary capacity losses, often worsening the conditions on already congested highway networks. The impacts of these temporary capacity losses include delay, reduced mobility, and reduced reliability of the highway system. They can also cause drivers to re-route or reschedule trips. Such information is vital to formulating sound public policies for the highway infrastructure and its operation. In response to this need, Oak Ridge National Laboratory, sponsored by the Federal Highway Administration (FHWA), made an initial attempt to provide nationwide estimates of the capacity losses and delay caused by temporary capacity-reducing events (Chin et al. 2002). This study, called the Temporary Loss of Capacity (TLC) study, estimated capacity loss and delay on freeways and principal arterials resulting from fatal and non-fatal crashes, vehicle breakdowns, and adverse weather, including snow, ice, and fog. In addition, it estimated capacity loss and delay caused by sub-optimal signal timing at intersections on principal arterials. It also included rough estimates of capacity loss and delay on Interstates due to highway construction and maintenance work zones. Capacity loss and delay were estimated for calendar year 1999, except for work zone estimates, which were estimated for May 2001 to May 2002 due to data availability limitations. Prior to the first phase of this study, which was completed in May of 2002, no nationwide estimates of temporary losses of highway capacity by type of capacity-reducing event had been made. This report describes the second phase of the TLC study (TLC2). TLC2 improves upon the first study by expanding the scope to include delays from rain, toll collection facilities, railroad crossings, and commercial truck pickup and delivery (PUD) activities in urban areas. It includes estimates of work zone capacity loss and delay for all freeways and principal arterials, rather than for Interstates only. It also includes improved estimates of delays caused by fog, snow, and ice, which are based on data not available during the initial phase of the study. Finally, computational errors involving crash and breakdown delay in the original TLC report are corrected.

  1. High-capacity hydrogen storage in lithium and sodium amidoboranes...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    capacity hydrogen storage in lithium and sodium amidoboranes. High-capacity hydrogen storage in lithium and sodium amidoboranes. Abstract: A substantial effort worldwide has been...

  2. Solid-State Hydrogen Storage: Storage Capacity,Thermodynamics...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Storage: Storage Capacity,Thermodynamics and Kinetics. Solid-State Hydrogen Storage: Storage Capacity,Thermodynamics and Kinetics. Abstract: Solid-state reversible...

  3. Is there life in other markets? BPA explores preschedule capacity

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    can diminish the federal hydropower system's capacity to balance supply and demand for power. The process allowed BPA to explore an untested capacity market this spring to acquire...

  4. Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics with SEI Layer Modeling-Thermo-electrochemistry, Capacity Degradation and Mechanics with SEI Layer 2011 DOE...

  5. RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND

    E-Print Network [OSTI]

    RULES FOR CONGESTION MANAGEMENT EVALUATION OF AVAILABILITY OF CAPACITY AND POSSIBILITIES.............................................................12 4.4 Available trading capacity in the market

  6. HT Combinatorial Screening of Novel Materials for High Capacity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HT Combinatorial Screening of Novel Materials for High Capacity Hydrogen Storage HT Combinatorial Screening of Novel Materials for High Capacity Hydrogen Storage Presentation for...

  7. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2012p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  8. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2011p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  9. Employee-Driven Initiative Increases Treatment Capacity, Reduces...

    Energy Savers [EERE]

    Employee-Driven Initiative Increases Treatment Capacity, Reduces Clean Water Demands Employee-Driven Initiative Increases Treatment Capacity, Reduces Clean Water Demands June 30,...

  10. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Office of Environmental Management (EM)

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the...

  11. Spent Nuclear Fuel (SNF) Project Design Basis Capacity Study

    SciTech Connect (OSTI)

    CLEVELAND, K.J.

    2000-08-17T23:59:59.000Z

    This study of the design basis capacity of process systems was prepared by Fluor Federal Services for the Spent Nuclear Fuel Project. The evaluation uses a summary level model of major process sub-systems to determine the impact of sub-system interactions on the overall time to complete fuel removal operations. The process system model configuration and time cycle estimates developed in the original version of this report have been updated as operating scenario assumptions evolve. The initial document released in Fiscal Year (FY) 1996 varied the number of parallel systems and transport systems over a wide range, estimating a conservative design basis for completing fuel processing in a two year time period. Configurations modeling planned operations were updated in FY 1998 and FY 1999. The FY 1998 Base Case continued to indicate that fuel removal activities at the basins could be completed in slightly over 2 years. Evaluations completed in FY 1999 were based on schedule modifications that delayed the start of KE Basin fuel removal, with respect to the start of KW Basin fuel removal activities, by 12 months. This delay resulted in extending the time to complete all fuel removal activities by 12 months. However, the results indicated that the number of Cold Vacuum Drying (CVD) stations could be reduced from four to three without impacting the projected time to complete fuel removal activities. This update of the design basis capacity evaluation, performed for FY 2000, evaluates a fuel removal scenario that delays the start of KE Basin activities such that staffing peaks are minimized. The number of CVD stations included in all cases for the FY 2000 evaluation is reduced from three to two, since the scenario schedule results in minimal time periods of simultaneous fuel removal from both basins. The FY 2000 evaluation also considers removal of Shippingport fuel from T Plant storage and transfer to the Canister Storage Building for storage.

  12. DOE mixed waste treatment capacity analysis

    SciTech Connect (OSTI)

    Ross, W.A.; Wehrman, R.R.; Young, J.R.; Shaver, S.R.

    1994-06-01T23:59:59.000Z

    This initial DOE-wide analysis compares the reported national capacity for treatment of mixed wastes with the calculated need for treatment capacity based on both a full treatment of mixed low-level and transuranic wastes to the Land Disposal Restrictions and on treatment of transuranic wastes to the WIPP waste acceptance criteria. The status of treatment capacity is reported based on a fifty-element matrix of radiation-handling requirements and functional treatment technology categories. The report defines the classifications for the assessment, describes the models used for the calculations, provides results from the analysis, and includes appendices of the waste treatment facilities data and the waste stream data used in the analysis.

  13. Heat capacity at the glass transition

    E-Print Network [OSTI]

    Kostya Trachenko; Vadim Brazhkin

    2010-07-13T23:59:59.000Z

    A fundamental problem of glass transition is to explain the jump of heat capacity at the glass transition temperature $T_g$ without asserting the existence of a distinct solid glass phase. This problem is also common to other disordered systems, including spin glasses. We propose that if $T_g$ is defined as the temperature at which the liquid stops relaxing at the experimental time scale, the jump of heat capacity at $T_g$ follows as a necessary consequence due to the change of system's elastic, vibrational and thermal properties. In this picture, we discuss time-dependent effects of glass transition, and identify three distinct regimes of relaxation. Our approach explains widely observed logarithmic increase of $T_g$ with the quench rate and the correlation of heat capacity jump with liquid fragility.

  14. Operations Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding access toTest and EvaluationOperational ManagementCenterOperations

  15. A study of freeway capacity in Texas

    E-Print Network [OSTI]

    Ringert, John Franklin

    1992-01-01T23:59:59.000Z

    studies have been undertaken to determine the value of capacity. A study by Hurdle and Datta in 1983 concluded that the value of 2, 000 pcphpl was still a good estimate of capacity (5). In contrast, a study by Agyemang-Duah (6) concluded...). Many other studies have attempted to measure the flows in both conditions and have produced varying results. Another related issue is the requirement for the existence of sufficient demand which is highlighted by McShane and Roess (13). Agyemang-Duah...

  16. (Data in thousand metric tons of metal unless otherwise noted) Domestic Production and Use: In 2006, 5 companies operated 13 primary aluminum smelters; 6 smelters were

    E-Print Network [OSTI]

    and Use: In 2006, 5 companies operated 13 primary aluminum smelters; 6 smelters were temporarily idled. Domestic smelters operated at about 62% of rated or engineered capacity. Imports for consumption increased Smelter Production and Capacity: Production Yearend capacity 2005 2006e 2005 2006e United States 2,481 2

  17. Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Lu, Shuai

    2008-07-15T23:59:59.000Z

    This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of the dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.

  18. STATE OF CALIFORNIA MAXIMUM RATED TOTAL COOLING CAPACITY

    E-Print Network [OSTI]

    that the installed space conditioning system must have a cooling capacity rating at ARI conditions that is equal Total Cooling Capacity of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities, then the sum of ARI Rated Cooling Capacities of the installed cooling systems must be calculated and entered

  19. TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION

    E-Print Network [OSTI]

    Yanikoglu, Berrin

    TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION 1 TURKEY'S CIVILIAN CAPACITY IN POST-CONFLICT RECONSTRUCTION by Teri Murphy & Onur Sazak #12;Turkey's Civilian Capacity in post-Conflict Reconstruction By Teri-checking was indispensable for the realization of this project. #12;TURKEY'S CIVILIAN CAPACITY IN POST

  20. PROJECT REPORT HVAC EQUIPMENT DEMOGRAPHICS AND CAPACITY

    E-Print Network [OSTI]

    California at Davis, University of

    - nently reduce the connected capacity, with respect to the HVAC system, by disconnecting compressors within RTUs that contain multiple compressors. We reviewed existing literature and col- lected primary data by conducting field surveys in order to estab- lish how multiple compressor RTUs are typically

  1. STORAGE CAPACITY ALLOCATION ALGORITHMS FOR HIERARCHICAL

    E-Print Network [OSTI]

    Stavrakakis, Ioannis

    STORAGE CAPACITY ALLOCATION ALGORITHMS FOR HIERARCHICAL CONTENT DISTRIBUTION Nikolaos Laoutaris of Athens, 15784 Athens, Greece {laoutaris,vassilis,istavrak}@di.uoa.gr Abstract The addition of storage storage budget to the nodes of a hierarchical con- tent distribution system is formulated; optimal

  2. CSEM WP 124 Capacity Markets for Electricity

    E-Print Network [OSTI]

    California at Berkeley. University of

    CSEM WP 124 Capacity Markets for Electricity Anna Creti, LEEERNA, University of Toulouse for Electricity Anna Creti LEEERNA, University of Toulouse Natalia Fabra Universidad Carlos III de Madrid February 2004 Abstract The creation of electricity markets has raised the fundamental question as to whether

  3. Kampung Capacity Local Solutions for Sustainable

    E-Print Network [OSTI]

    Kammen, Daniel M.

    Kampung Capacity Local Solutions for Sustainable Rural Energy in the Baram River Basin, Sarawak and social opportunities of up to 1.5 billion people worldwide. As a critical case in point, most rural of service provision based on large-scale regional electrification. A range of different renewable energy

  4. Capacity Building in Wind Energy for PICs

    E-Print Network [OSTI]

    indicates that significant wind energy potential exists. · A monitoring project showed that in Rarotonga system. · About 30 other islands could have potential for grid connected wind turbines in the 100-1000 k1 Capacity Building in Wind Energy for PICs Presentation of the project Regional Workshop Suva

  5. Constrained capacity of MIMO Rayleigh fading channels

    E-Print Network [OSTI]

    He, Wenyan

    2011-08-08T23:59:59.000Z

    In this thesis channel capacity of a special type of multiple-input multiple-output (MIMO) Rayleigh fading channels is studied, where the transmitters are subject to a finite phase-shift keying (PSK) input alphabet. The constraint on the input...

  6. Checklist 2 The first days in Germany

    E-Print Network [OSTI]

    Kemper, Gregor

    Checklist 2 The first days in Germany Further information and explanations for the following points (former E111 or E128) or EHIC-Card to one of the social insurers in Germany. You will then be issued in Germany! Only when you have a permanent address you can register with the Citizens' Bureau (Bürgerbüro

  7. Engineering Exploration Day Saturday, February 13, 2010

    E-Print Network [OSTI]

    Rutledge, Steven

    Engineering Exploration Day Saturday, February 13, 2010 Fort Collins, Colorado #12;2 EXPLORATION Engineering, Dr. Ken Reardon LSC Room 224-226 Electrical & Computer Engineering, Karen Ungerer LSC Room 228 Environmental Engineering, Dr. Sybil Sharvelle LSC Room 230 Mechanical Engineering, Dr. Patrick Fitzhorn

  8. TEAM DAY GLOBC 21 janvier 2004

    E-Print Network [OSTI]

    Page 1 TEAM DAY GLOBC 21 janvier 2004 #12;Page 2 Plan général ·OASIS ·PALM ·Perspectives PALM-OASIS ·Applications PALM #12;Page 3 Le coupleur OASIS ·OASIS ·L'historique ·La communauté aujourd'hui ·Le projet PRISM ·OASIS3: Finalisation et diffusion ·OASIS4: 1ère version d'un coupleur parallèle ·Perspectives OASIS #12

  9. One day seminar: Genetics and Genomics of

    E-Print Network [OSTI]

    Brierley, Andrew

    SCHOOL OF MEDICINE One day seminar: Genetics and Genomics of Infectious Diseases Malaria and TB 14th June 2013 University of St Andrews - School of Medicine Pathogen genome research allows exquisite to understanding disease progression. Pathogen genome sequencing is accessible to most. Outputs have broad

  10. Nordic Polymer Days 2006 Copenhagen, Denmark

    E-Print Network [OSTI]

    Abstract Nordic Polymer Days 2006 Copenhagen, Denmark Polyacrylamide nanosensor embedded Scharff-Poulsen, c Hong Gu, d Wolf B. Fromme, b Iver Jakobsen, a Kristoffer Almdal a The Danish Polymer-linked polymer in nanometer scale, have several advantages over direct loading of cells with fluorescent probes

  11. Operation Poorman

    SciTech Connect (OSTI)

    Pruvost, N.; Tsitouras, J.

    1981-03-18T23:59:59.000Z

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  12. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeeding accessSpeedingOctoberResearchOpen→ globalOPERATING PLAN

  13. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeeding accessSpeedingOctoberResearchOpen→ globalOPERATING

  14. Trellis coded modulation and capacity for multi-level intensity modulated optical systems

    E-Print Network [OSTI]

    Jardak, Hadi George

    1990-01-01T23:59:59.000Z

    Maximum Capacity: Constraint on Average: 5-levels 24 Maximum Capacity: Constraint on Average: 8-levels 132 183 134 185 25 Minimum Error Probability: Constraint on Average per bit: 3-levels. . . 18G 2G Minimum Error Probability: Constraint on Average...-levels case, which will elucidate the way the receiver operates. We have the choice of sending no signal, AI or A2, (0 & AI & A2). ~[5 As derived earlier the optimal receiver implements the decision rule max kin(A;) ? A, . The threshold between AI...

  15. TITLE: Multimedia Over the Internet DURATION: Half day (can be extended to full-day)

    E-Print Network [OSTI]

    Furht, Borko

    SEMINAR TITLE: Multimedia Over the Internet DURATION: Half day (can be extended to full-day) INSTRUCTOR: Borko Furht, Professor and Director of NSF Multimedia Laboratory Department of Computer Science-2800 Email: borko@cse.fau.edu OBJECTIVE: Multimedia coupled with information superhighways allows

  16. Finance, IT Operations& InformationSecurity Dear Colleagues,

    E-Print Network [OSTI]

    Finance, IT Operations& InformationSecurity Dear Colleagues, Compliance and customer service. Strategic planning and attention to day-to-day operations. Some of our activities during the past quarter awareness, and responding to incidents. Thank you to everyone who has completed a survey or provided

  17. Operational Excellence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclear Astrophysics One ofSpeedingthis site » OpenOperational

  18. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeeding accessSpeedingOctoberResearchOpen→ globalOPERATING Who We

  19. What is a High Electric Demand Day?

    Broader source: Energy.gov [DOE]

    This presentation by T. McNevin of the New Jersey Bureau of Air Quality Planning was part of the July 2008 Webcast sponsored by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Clean Energy and Air Quality Integration Initiative that was titled Role of Energy Efficiency and Renewable Energy in Improving Air Quality and Addressing Greenhouse Gas Reduction Goals on High Electric Demand Days.

  20. Computational Fluid Dynamics Modeling of the John Day Dam Tailrace

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

    2010-07-08T23:59:59.000Z

    US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

  1. Calculations of Heat-Capacities of Adsorbates

    E-Print Network [OSTI]

    LAWRENCE, WR; Allen, Roland E.

    1976-01-01T23:59:59.000Z

    PHYSICAL REVIEW B VOLUME 14, NUMBER 7 1 OCTOBER 1976 Calculations of heat capacities of adsorbates W. R. Lawrence and R. E. Allen Department of Physics, Texas A& M University, College Station, Texas 77843 (Received 2 September 1975) The phonon... the substrate has a perfect (100) surface and the adsorbate goes down as a solid monolayer in registry with the substrate. The quasiharmonic approximation was used, and the results for Ne adsorbates were considerably different from those obtained...

  2. A kinematic wave theory of capacity drop

    E-Print Network [OSTI]

    Wen-Long Jin; Qi-Jian Gan; Jean-Patrick Lebacque

    2013-10-09T23:59:59.000Z

    Capacity drop at active bottlenecks is one of the most puzzling traffic phenomena, but a thorough understanding is practically important for designing variable speed limit and ramp metering strategies. In this study, we attempt to develop a simple model of capacity drop within the framework of kinematic wave theory based on the observation that capacity drop occurs when an upstream queue forms at an active bottleneck. In addition, we assume that the fundamental diagrams are continuous in steady states. This assumption is consistent with observations and can avoid unrealistic infinite characteristic wave speeds in discontinuous fundamental diagrams. A core component of the new model is an entropy condition defined by a discontinuous boundary flux function. For a lane-drop area, we demonstrate that the model is well-defined, and its Riemann problem can be uniquely solved. We theoretically discuss traffic stability with this model subject to perturbations in density, upstream demand, and downstream supply. We clarify that discontinuous flow-density relations, or so-called "discontinuous" fundamental diagrams, are caused by incomplete observations of traffic states. Theoretical results are consistent with observations in the literature and are verified by numerical simulations and empirical observations. We finally discuss potential applications and future studies.

  3. Operation of staged membrane oxidation reactor systems

    DOE Patents [OSTI]

    Repasky, John Michael

    2012-10-16T23:59:59.000Z

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  4. Forest Resources Mike Day, SFR Safety Coordinator

    E-Print Network [OSTI]

    Thomas, Andrew

    and NSFA safety procedures and policies manuals · Laboratories: ­ MSDS ­ Chemical hygiene plan (CHP) · Motorized equipment · Chemical hygiene Additional requirements for lab workers: SFR h i l h i l (CHP) l· SFR chemical hygiene plan (CHP), annual · Standard operating procedures (SOP) · Chemical spill response · Fire

  5. January 29, 2011 (Day-1) Time Description

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    0930-1230 Hrs First Lecture- Basic Of Digital Manufacturing, Parts of PLM software, Advantage of DM, E optimization, production advantages using operations management through PLM (AKM) 1230- 1330 Hrs Lunch 1330 Break 1600- 1830 Hrs Digital Supply Lab-2 (Introduction to other aspects of PLM software) 2000 Hrs

  6. Gulf operators resuming production

    SciTech Connect (OSTI)

    Koen, A.D.

    1992-09-14T23:59:59.000Z

    This paper reports that Gulf of Mexico operators last week were gradually restoring production at installations struck by Hurricane Andrew. The Minerals Management Service continued receiving reports of more damage. By the end of the day Sept. 8, MMS had received reports of damage to 83 pipeline segments and 193 platforms and satellite installations. Damage reports listed 112 installations with structural damage, 13 platforms toppled and five leaning, and 30 satellite platforms toppled and 33 leaning. But despite the extent of damage the storm inflicted on oil and gas installations in the gulf, it pales in comparison to the misery and suffering the storm caused in Florida and Louisiana, an oil company official said.

  7. Effect Of Oxidation On Chromium Leaching And Redox Capacity Of Slag-Containing Waste Forms

    SciTech Connect (OSTI)

    Almond, P. M.; Stefanko, D. B.; Langton, C. A.

    2013-03-01T23:59:59.000Z

    The rate of oxidation is important to the long-term performance of reducing salt waste forms because the solubility of some contaminants, e.g., technetium, is a function of oxidation state. TcO{sub 4}{sup ?} in the salt solution is reduced to Tc(IV) and has been shown to react with ingredients in the waste form to precipitate low solubility sulfide and/or oxide phases [Shuh, et al., 1994, Shuh, et al., 2000, Shuh, et al., 2003]. Upon exposure to oxygen, the compounds containing Tc(IV) oxidize to the pertechnetate ion, Tc(VII)O{sub 4}{sup ?}, which is very soluble. Consequently the rate of technetium oxidation front advancement into a monolith and the technetium leaching profile as a function of depth from an exposed surface are important to waste form performance and ground water concentration predictions. An approach for measuring contaminant oxidation rate (effective contaminant specific oxidation rate) based on leaching of select contaminants of concern is described in this report. In addition, the relationship between reduction capacity and contaminant oxidation is addressed. Chromate was used as a non-radioactive surrogate for pertechnetate in simulated waste form samples. Depth discrete subsamples were cut from material exposed to Savannah River Site (SRS) ''field cured'' conditions. The subsamples were prepared and analyzed for both reduction capacity and chromium leachability. Results from field-cured samples indicate that the depth at which leachable chromium was detected advanced further into the sample exposed for 302 days compared to the sample exposed to air for 118 days (at least 50 mm compared to at least 20 mm). Data for only two exposure time intervals is currently available. Data for additional exposure times are required to develop an equation for the oxidation front progression. Reduction capacity measurements (per the Angus-Glasser method, which is a measurement of the ability of a material to chemically reduce Ce(IV) to Ce(III) in solution) performed on depth discrete samples could not be correlated with the amount of chromium leached from the depth discrete subsamples or with the oxidation front inferred from soluble chromium (i.e., effective Cr oxidation front). Exposure to oxygen (air or oxygen dissolved in water) results in the release of chromium through oxidation of Cr(III) to highly soluble chromate, Cr(VI). Residual reduction capacity in the oxidized region of the test samples indicates that the remaining reduction capacity is not effective in re-reducing Cr(VI) in the presence of oxygen. Consequently, this method for determining reduction capacity may not be a good indicator of the effective contaminant oxidation rate in a relatively porous solid (40 to 60 volume percent porosity). The chromium extracted in depth discrete samples ranged from a maximum of about 5.8 % at about 5 mm (118 day exposure) to about 4 % at about 10 mm (302 day exposure). The use of reduction capacity as an indicator of long-term performance requires further investigation. The carbonation front was also estimated to have advanced to at least 28 mm in 302 days based on visual observation of gas evolution during acid addition during the reduction capacity measurements. Depth discrete sampling of materials exposed to realistic conditions in combination with short term leaching of crushed samples has potential for advancing the understanding of factors influencing performance and will support conceptual model development.

  8. One multivariable controller increased capacity of an Oleflex{trademark}/MTBE complex

    SciTech Connect (OSTI)

    Robertson, D.; Peterson, T.J.; O`Connor, D. [Dynamic Matrix Control Corp., Houston, TX (United States); Adams, V.; Payne, D. [Valero Refining Co., Corpus Christi, TX (United States)

    1996-12-01T23:59:59.000Z

    Capacity increased by more than 4.6% when one dynamic matrix controller began operating in Valero Refining Company`s MTBE production complex in Corpus Christi, Texas. This was on a plant that was already running well above design capacity due to process changes previously made on the plant. A single controller was developed to cover an Oleflex{trademark} isobutane dehydrogenation unit and an MTBe reaction and fractionation plant with the intermediate isobutylene surge drum. The overall benefit is realized by a comprehensive constrained multivariable predictive controller which properly handles all sets of limits experienced by the complex, whether limited by the front-end Oleflex{trademark} or back-end MTBE unit. The controller has 20 manipulated, 6 disturbance and 44 controlled variables, and covers widely varying dynamics with settling times ranging from twenty minutes to six hours. The controller executes each minute with a six hour time horizon. A unique achievement is intelligent handling of the surge drum level by the controller for higher average daily capacity of the complex as a whole. The Oleflex{trademark} often operates at simultaneous limits on reactor effluent compressor capacity, cold box temperature and hydrogen/hydrocarbon ratio and the MTBE at impurity in butene column overhead as well as impurity in MTBE product.

  9. Property:DayQuantity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,PillarPublicationType JumpDOEInvolve Jump to: navigation,DayQuantity Jump to:

  10. 4th Day Energy | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORT Americium/Curium Vitrification4th Day Energy Jump to:

  11. SunDay | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolar Jump to: navigation, searchNewOpenSumpter,Sun CitySunSunConnexSunDay

  12. Ideas for What to Do this Earth Day

    Broader source: Energy.gov [DOE]

    Given that Earth Day's coming up in a couple of days, you might find a few things you can do if you choose to celebrate Earth Day this year.

  13. National CHP Roadmap: Doubling Combined Heat and Power Capacity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Roadmap: Doubling Combined Heat and Power Capacity in the United States by 2010, March 2001 National CHP Roadmap: Doubling Combined Heat and Power Capacity in the United States...

  14. Evaluation of capacity release transactions in the natural gas industry

    E-Print Network [OSTI]

    Lautzenhiser, Stephen

    1994-01-01T23:59:59.000Z

    The purpose of this thesis is to analyze capacity release transactions in the natural gas industry and to state some preliminary conclusions about how the capacity release market is functioning. Given FERC's attempt to ...

  15. Storage and capacity rights markets in the natural gas industry

    E-Print Network [OSTI]

    Paz-Galindo, Luis A.

    1999-01-01T23:59:59.000Z

    This dissertation presents a different approach at looking at market power in capacity rights markets that goes beyond the functional aspects of capacity rights markets as access to transportation services. In particular, ...

  16. anaerobic work capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aspect of working memory (WM) is the capacity to maintain goal-relevant information in mind, but little is known about how this capacity develops in the human brain. We compared...

  17. Model NOx storage systems: Storage capacity and thermal aging...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model NOx storage systems: Storage capacity and thermal aging of BaOtheta- Al2O3NiAl(100). Model NOx storage systems: Storage capacity and thermal aging of BaOtheta- Al2O3...

  18. Optimal Capacity Conversion for Product Transitions Under High Service Requirements

    E-Print Network [OSTI]

    Li, Hongmin

    We consider the capacity planning problem during a product transition in which demand for a new-generation product gradually replaces that for the old product. Capacity for the new product can be acquired both by purchasing ...

  19. ISO New England Forward Capacity Market (Rhode Island)

    Broader source: Energy.gov [DOE]

    Under the Forward Capacity Market (FCM), ISO New England projects the capacity needs of the region’s power system three years in advance and then holds an annual auction to purchase the power...

  20. Secretary Moniz Warms Up For Earth Day Pitch | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Warms Up For Earth Day Pitch Secretary Moniz Warms Up For Earth Day Pitch Addthis Speakers Secretary Ernest Moniz Duration :32...

  1. Author's personal copy Ramp metering and freeway bottleneck capacity

    E-Print Network [OSTI]

    Levinson, David M.

    ; Hall and Agyemang-Duah, 1991; Banks, 1991a,b). The two-capacity hypothesis argues that metering can

  2. Section Course Term Credits Room Day Time 132D ALS4932 Fall 1 WEB WEB WEB

    E-Print Network [OSTI]

    Watson, Craig A.

    Section Course Term Credits Room Day Time 132D ALS4932 Fall 1 WEB WEB WEB 1G73 FNR3131C Fall 3 DEGREE APPLICATIONS DUE September 13th CLASSES END December 4th WEB WEB WEB WEB Forest Operations Sager WEB Capinera WEB Turf and Ornamental Entomology Buss WEB Bennet Capinera Lutz STAFF Mac

  3. Constrained capacity of MIMO Rayleigh fading channels 

    E-Print Network [OSTI]

    He, Wenyan

    2011-08-08T23:59:59.000Z

    . : : : : : : : : : : : : : : : : 32 1 CHAPTER I INTRODUCTION As IEEE 802.11n standards become more and more readily available in various elec- tronics products, multi-input multi-output (MIMO) has never been more accepted by the general public. With 3G networks gradually... Array? ? M N 11h NMh ijh Fig. 1. Block diagram of a MIMO system. This thesis follows the style of IEEE Transactions on Information Theory. 2 A. Previous Work on MIMO Capacity After the pioneering work on MIMO systems was published by Telatar [1...

  4. Petrochem industry expands North American MTBE capacity

    SciTech Connect (OSTI)

    Not Available

    1992-10-05T23:59:59.000Z

    This paper reports that petrochemical manufacturers continue to increase methyl tertiary butyl ether (MTBE) capacity in North America. The action reflects refiners' reformulation of gasoline to help reduce auto emissions. Demand for gasoline blending oxygenates such as MTBE is expected to increase as U.S. refiners reconfigure processing trains to produce fuels meeting requirements of the Clean Air Act amendments of 1990. Recent progress includes plans to build an MTBE plant in Mexico and start-ups of plants on the U.S. Gulf Coast and in Canada.

  5. Excess Capacity from LADWP Control Area

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010Salt | DepartmentExamination Report:Excess Capacity from

  6. Property:Capacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,PillarPublicationType Jump to: navigation, search This isCapRockAge JumpCapacity

  7. Property:USGSMeanCapacity | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I GeothermalPotentialBiopowerSolidGenerationMethod Jump to:This property isType"USGSMeanCapacity Jump to:

  8. STATE OF CALIFORNIA MAXIMUM RATED TOTAL COOLING CAPACITY

    E-Print Network [OSTI]

    /09) CALIFORNIA ENERGY COMMISSION INSTALLATION CERTIFICATE CF-6R-MECH-27-HERS Maximum Rated Total Cooling Capacity of the installed system (Btu/hr) 3b Sum of the ARI Rated Total Cooling Capacities of multiple systems installed Cooling Capacities of the installed cooling systems must be calculated and entered in row 3b. 4a MRTCC

  9. GROUNDWATER NITRATE REMOVAL CAPACITY OF RIPARIAN ZONES IN

    E-Print Network [OSTI]

    Gold, Art

    , and 3 in Urban watersheds to study denitrification capacity. Mini-piezometers were installed at eachGROUNDWATER NITRATE REMOVAL CAPACITY OF RIPARIAN ZONES IN URBANIZING WATERSHEDS BY TARA KIMBERLY and geomorphology of riparian zones, potentially changing riparian groundwater denitrification capacity. Little work

  10. Developing Leadership Capacity Conference The New Romantics of Responsible Leadership

    E-Print Network [OSTI]

    Diggle, Peter J.

    The 6th Developing Leadership Capacity Conference The New Romantics of Responsible Leadership 8th Conference Timetable Developing Leadership Capacity in Times of Austerity and Economic Crisis Grasmere from 6th Developing Leadership Capacity Conference Monday 7th July 2014 Venue 10.30 Round Table Event

  11. Assessing Efficiency and Capacity in Fisheries James E. Kirkley

    E-Print Network [OSTI]

    Assessing Efficiency and Capacity in Fisheries James E. Kirkley College of William and Mary.M.Ward@noaa.gov ____________________ Prepared for the National Marine Fisheries Service Workshop of "Assessing Technical Efficiency and Capacity in Fisheries (Silver Spring, Maryland; September 29 - October 1, 1999). #12;Efficiency and Capacity iv Table

  12. Capacity of Wireless Ad Hoc Networks Using Practical Directional Antennas

    E-Print Network [OSTI]

    , which is called MC-MDA network. The capacity in MC-MDA network is derived under arbitrary and random of side lobe and back lobe into account. We derive the capacity upper-bounds of MC-MDA networks decreases when s increases. Moreover, we compare the network capacity of MC-MDA using the simplified antenna

  13. TOWARDS REACHING CONSENSUS IN THE DETERMINATION OF PHOTOVOLTAICS CAPACITY CREDIT

    E-Print Network [OSTI]

    Perez, Richard R.

    , 251 Fuller Rd Albany, NY, 12203 Perez@asrc.cestm.albany,edu Mike Taylor Solar Electric Power effort to reach consensus on the notion of capacity credit for solar power electrical generation capacity or capacity credit of a power plant quantifies the output of a power plant that effectively

  14. Building Environmental Health Capacity in Allegheny County

    E-Print Network [OSTI]

    of Reporting Audience Served Type of Indicator Total population in an area where air quality for ozone or PM-2 #12;Indicator Name Suggested Measure Data Source Air Quality Index (AQI) Maximum Air Quality Index on any particular day Air Quality Computer Systems Ambient Pollutants Attainment of ozone 8- hour

  15. Information storage capacity of discrete spin systems

    SciTech Connect (OSTI)

    Yoshida, Beni, E-mail: rouge@caltech.edu

    2013-11-15T23:59:59.000Z

    Understanding the limits imposed on information storage capacity of physical systems is a problem of fundamental and practical importance which bridges physics and information science. There is a well-known upper bound on the amount of information that can be stored reliably in a given volume of discrete spin systems which are supported by gapped local Hamiltonians. However, all the previously known systems were far below this theoretical bound, and it remained open whether there exists a gapped spin system that saturates this bound. Here, we present a construction of spin systems which saturate this theoretical limit asymptotically by borrowing an idea from fractal properties arising in the Sierpinski triangle. Our construction provides not only the best classical error-correcting code which is physically realizable as the energy ground space of gapped frustration-free Hamiltonians, but also a new research avenue for correlated spin phases with fractal spin configurations. -- Highlights: •We propose a spin model with fractal ground states and study its coding properties. •We show that the model asymptotically saturates a theoretical limit on information storage capacity. •We discuss its relations to various theoretical physics problems.

  16. IBRD Operational Decision Framework

    SciTech Connect (OSTI)

    Greenwalt, R; Hibbard, W; Raber, E; Carlsen, T; Folks, K; MacQueen, D; Mancieri, S; Bunt, T; Richards, J; Hirabayashi-Dethier, J

    2010-11-12T23:59:59.000Z

    The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

  17. Chiller Plant Design Goals Low operating cost

    E-Print Network [OSTI]

    3/9/09 1 2 Chiller Plant Design Goals · Low operating cost ­Energy Efficiency ­No full time staffing · Reliability ­24/7 ­ 365 ­Maintainability · Future expansion capability #12;3/9/09 2 3 Chiller T 4 Chiller Plant Electrical · Electrical ­N+1 transformer capacity ­4160 volt Compressor Motors

  18. Abstract--One of the major problems for the massive applicability of Electric Vehicles (EVs) is the scarce capacity of

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    ) is the scarce capacity of conventional electrical energy storage systems. Although this constraint has been, if a particular situation is considered, in which a small-sized, high- efficiency EV operates at low duty cycles. This paper deals with the reach of this approach. Index Terms--Battery Chargers, Photovoltaic Cells, Road

  19. Adsorption -capacity data for 283 organic compounds

    SciTech Connect (OSTI)

    Yaws, C.L.; Bu, L.; Nijhawan, S. [Lamar Univ., Beaumont, TX (United States)

    1995-05-01T23:59:59.000Z

    Adsorption on activated carbon is a widely used method for removing volatile organic compounds (VOCs) from gases and other exhaust streams. This article presents a compilation of adsorption-capacity data as a function of the VOC concentration in the gas. The results are useful in engineering and environmental studies, and in the design of carbon-based adsorption systems to remove unwanted organic pollutants from gases. For vapor control, carbon-based systems typically combine a carbon-adsorption unit with a secondary control method to reclaim or destroy the vapors desorbed during carbon-bed regeneration. To remove organics dissolved in wastewater, air stripping is typically used to transfer the organics to a vapor stream. Carbon adsorption is then used to separate the organics from the stripper exhaust. Collected vapors can be recovered for reuse or destroyed, depending on their value.

  20. Korean oxygenates rule sparks MTBE capacity plans

    SciTech Connect (OSTI)

    Kim, Hyung-Jin

    1994-06-15T23:59:59.000Z

    The Korean government`s strict standard for gasoline sold domestically is expected to have a significant impact on the methyl tert-butyl ether (MTBE) market. The mandate-requiring gasoline oxygen content of 0.5% this year, 0.75% by 1996, and 1.0% by 1998-has sparked a rush by Korean refineries to build new MTBE plants. If expansion plans are carried out, Korea`s MTBE capacity will increase from 280,000 m.t./year to 650,000 m.t./year by 1996, far surpassing predicted demand. Honam Oil, part of the Lucky Group, plans startup of a 100,000-m.t./year unit at Yeochon by early 1996. In addition, by the end of 1996 Ssangyong Oil will bring a 100,000-m.t./year unit onstream.

  1. Information storage capacity of discrete spin systems

    E-Print Network [OSTI]

    Beni Yoshida

    2012-12-24T23:59:59.000Z

    Understanding the limits imposed on information storage capacity of physical systems is a problem of fundamental and practical importance which bridges physics and information science. There is a well-known upper bound on the amount of information that can be stored reliably in a given volume of discrete spin systems which are supported by gapped local Hamiltonians. However, all the previously known systems were far below this theoretical bound, and it remained open whether there exists a gapped spin system that saturates this bound. Here, we present a construction of spin systems which saturate this theoretical limit asymptotically by borrowing an idea from fractal properties arising in the Sierpinski triangle. Our construction provides not only the best classical error-correcting code which is physically realizable as the energy ground space of gapped frustration-free Hamiltonians, but also a new research avenue for correlated spin phases with fractal spin configurations.

  2. Modeling the Capacity and Emissions Impacts of Reduced Electricity Demand. Part 1. Methodology and Preliminary Results.

    E-Print Network [OSTI]

    Coughlin, Katie

    2013-01-01T23:59:59.000Z

    in the required total installed capacity (GW). Additionalemissions and installed capacity per unit of generationb) The change in installed capacity by fuel/technology type,

  3. Empirical Estimates and Observations of 0Day Vulnerabilities

    SciTech Connect (OSTI)

    Miles A. McQueen; Trevor A. McQueen; Wayne F. Boyer; May R. Chaffin

    2009-01-01T23:59:59.000Z

    We define a 0Day vulnerability to be any vulnerability, in deployed software, that has been discovered by at least one person but has not yet been publicly announced or patched. These 0Day vulnerabilities are of particular interest when assessing the risk to a system from exploit of vulnerabilities which are not generally known to the public or, most importantly, to the owners of the system. Using the 0Day definition given above, we analyzed the 0Day lifespans of 491 vulnerabilities and conservatively estimated that in the worst year there were on average 2500 0Day vulnerabilities in existence on any given day. Then using a small but intriguing set of 15 0Day vulnerability lifespans representing the time from actual discovery to public disclosure, we made a more aggressive estimate. In this case, we estimated that in the worst year there were, on average, 4500 0Day vulnerabilities in existence on any given day.

  4. MBTA Green Line 3-car train operating plans to enhance capacity and reliability

    E-Print Network [OSTI]

    Malikova, Alexandra A

    2012-01-01T23:59:59.000Z

    Transit agencies face a variety of challenges, from increasing ridership to changes in infrastructure, to system expansions, all of which require significant preparation to accommodate the changes without affecting passengers ...

  5. A Markov method for generating capacity reliability evaluation including operating considerations

    E-Print Network [OSTI]

    Asgarpoor, Sohrab

    1981-01-01T23:59:59.000Z

    ) ~ ~ ( 100) 5(100), KAPS(100) ~ ALPHA( 100) O(20, 900) IF(900) I, V(400) R(900) H(20) CAP(20), UNN(20) LAM(20), MEW(20) LOAD(100) 1 s(20) NT(6000 2) ST(200) CAPP(100) ~ CAPS( IGQI, E(100 100) I MA(100) SA(100) 58(20 ~ 100) ~ SO(20 ~ 100) SC(100) SE(100...) ~ SN(100) '3(MENSIQN LOSP( 100) . P T(100), IR(20, (00) PR ( 100) C C C C C C C C C C C C C C C C DOUBLE PRECISION GI, P A 8 C C E, S PT PR FR I. '(TEGER H, Q 0 V, CAP, W SU, I CD CA JNN HE, H2 I, ST, SA 58 SD SC SE ~ SN I, SPRS REAL...

  6. ,"U.S. Downstream Charge Capacity of Operable Petroleum Refineries"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources andPlant Liquids,+ LeasePrice SoldPlantGrossDistillateReserves+Charge

  7. ,"U.S. Production Capacity of Operable Petroleum Refineries"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources andPlant Liquids,+LiquidsAnnual",2014Annual",2014Gas,

  8. ,"U.S. Total Shell Storage Capacity at Operable Refineries"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy SourcesRefinery, Bulk Terminal, and Natural Gas Plant StocksPetroleum

  9. ,"U.S. Working Storage Capacity at Operable Refineries"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy SourcesRefinery, Bulk Terminal, and Natural GasU.S. Underground NaturalWorking

  10. An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

    2004-06-01T23:59:59.000Z

    This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

  11. Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response

    SciTech Connect (OSTI)

    Kiliccote, Sila; Piette, Mary Ann

    2008-10-01T23:59:59.000Z

    This report summarizes San Diego Gas& Electric Company?s collaboration with the Demand Response Research Center to develop and test automation capability for the Capacity Bidding Program in 2007. The report describes the Open Automated Demand Response architecture, summarizes the history of technology development and pilot studies. It also outlines the Capacity Bidding Program and technology being used by an aggregator that participated in this demand response program. Due to delays, the program was not fully operational for summer 2007. However, a test event on October 3, 2007, showed that the project successfully achieved the objective to develop and demonstrate how an open, Web?based interoperable automated notification system for capacity bidding can be used by aggregators for demand response. The system was effective in initiating a fully automated demand response shed at the aggregated sites. This project also demonstrated how aggregators can integrate their demand response automation systems with San Diego Gas& Electric Company?s Demand Response Automation Server and capacity bidding program.

  12. LANL continuity of operations plan

    SciTech Connect (OSTI)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22T23:59:59.000Z

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

  13. Surface and bulk modified high capacity layered oxide cathodes with low irreversible capacity loss

    DOE Patents [OSTI]

    Manthiram, Arumugam (Austin, TX); Wu, Yan (Austin, TX)

    2010-03-16T23:59:59.000Z

    The present invention includes compositions, surface and bulk modifications, and methods of making of (1-x)Li[Li.sub.1/3Mn.sub.2/3]O.sub.2.xLi[Mn.sub.0.5-yNi.sub.0.5-yCo.sub.2- y]O.sub.2 cathode materials having an O3 crystal structure with a x value between 0 and 1 and y value between 0 and 0.5, reducing the irreversible capacity loss in the first cycle by surface modification with oxides and bulk modification with cationic and anionic substitutions, and increasing the reversible capacity to close to the theoretical value of insertion/extraction of one lithium per transition metal ion (250-300 mAh/g).

  14. ,"Plant","Primary Energy Source","Operating Company","Net Summer...

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Source","Operating Company","Net Summer Capacity (MW)" 1,"Seabrook","Nuclear","NextEra Energy Seabrook LLC",1246.2 2,"Granite Ridge","Natural Gas","Granite...

  15. Ozone Standard Exceedance Days in the South San Joaquin Valley

    E-Print Network [OSTI]

    Jan de Leeuw; Shuojun Wang

    2011-01-01T23:59:59.000Z

    about the health e?ects of ozone. CES is looking at many8h national std. days OZONE STANDARDS F????? 2. Bakers?eld8h national std. days OZONE STANDARDS Time F????? 4. Shafter

  16. Ozone Standard Exceedance Days in the South San Joaquin Valley

    E-Print Network [OSTI]

    de Leeuw, Jan; Wang, Shuojun

    2007-01-01T23:59:59.000Z

    about the health e?ects of ozone. CES is looking at many8h national std. days OZONE STANDARDS F????? 2. Bakers?eld8h national std. days OZONE STANDARDS Time F????? 4. Shafter

  17. 90-day Interim Report on Shale Gas Production - Secretary of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    90-day Interim Report on Shale Gas Production - Secretary of Energy Advisory Board 90-day Interim Report on Shale Gas Production - Secretary of Energy Advisory Board The Shale Gas...

  18. Happy Earth Day! 39 and Counting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Day 39 and Counting Happy Earth Day 39 and Counting April 22, 2009 - 10:55am Addthis Drew Bittner Communications Lead, Office of Small and Disadvantaged Business Utilization It...

  19. attending day care: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    children in care in Year 10+ What will the event involve Travis, Adrian 8 INTRODUCTION Health care providers face many challenges in the day to day pursuit of Materials Science...

  20. attend day care: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    children in care in Year 10+ What will the event involve Travis, Adrian 8 INTRODUCTION Health care providers face many challenges in the day to day pursuit of Materials Science...

  1. An Efficient Algorithm for Computing Robust Minimum Capacity st Cuts

    E-Print Network [OSTI]

    Doug Altner

    2008-03-20T23:59:59.000Z

    Mar 20, 2008 ... In this paper, we present an efficient algorithm for computing minimum capacity s-t cuts under a polyhedral model of robustness. Our algorithm ...

  2. Indonesia-ECN Capacity building for energy policy formulation...

    Open Energy Info (EERE)

    building for energy policy formulation and implementation of sustainable energy projects Jump to: navigation, search Name CASINDO: Capacity development and strengthening for energy...

  3. Open versus closed loop capacity equilibria in electricity markets ...

    E-Print Network [OSTI]

    S. Wogrin

    2012-05-07T23:59:59.000Z

    May 7, 2012 ... Abstract: We consider two game-theoretic models of the generation capacity expansion problem in liberalized electricity markets. The first is an ...

  4. CLEAN-Capacity Building and Training for Low Emissions Development...

    Open Energy Info (EERE)

    Development Planning Jump to: navigation, search Tool Summary Name: CLEAN-Capacity Building and Training for Low Emissions Development Planning AgencyCompany Organization:...

  5. Optimization of Flexural capacity Of Reinforced fibrous concrete ...

    E-Print Network [OSTI]

    D Suji

    2005-12-22T23:59:59.000Z

    Dec 22, 2005 ... Optimization of Flexural capacity Of Reinforced fibrous concrete Beams Using Genetic Algorithm. D Suji (suji_mohan2002 ***at*** yahoo.com)

  6. affecting energy capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    organization of Santiago affects its capacity to design and apply urban energy initiatives MIT - DSpace Summary: The need for greater levels of energy efficiency has never...

  7. Geothermal: Sponsored by OSTI -- Geothermal Plant Capacity Factors

    Office of Scientific and Technical Information (OSTI)

    Plant Capacity Factors Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us HomeBasic Search About Publications Advanced Search New Hot Docs News Related...

  8. Design and Evaluation of Novel High Capacity Cathode Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Design and Evaluation of Novel High Capacity Cathode Materials Lithium Source For High Performance Li-ion Cells Lithium Source For High Performance Li-ion...

  9. DOE Receives Responses on the Implementation of Large-Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process Electrolux Gibson Air Conditioner and Equator Clothes Washer Fail DOE Energy Star Testing...

  10. assessing nuclear capacity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    who are familiar Langendoen, Koen 5 Assessing the Control Systems Capacity for Demand Response in Energy Storage, Conversion and Utilization Websites Summary: LBNL-5319E...

  11. Serbia-Enhancing Capacity for Low Emission Development Strategies...

    Open Energy Info (EERE)

    for Low Emission Development Strategies (EC-LEDS) Jump to: navigation, search Name Serbia-Enhancing Capacity for Low Emission Development Strategies (EC-LEDS) AgencyCompany...

  12. SPIDERS Joint Capability Technology Demonstration Industry Day Presentations

    Broader source: Energy.gov [DOE]

    Presentations from the SPIDERS Joint Capability Technology Demonstration Industry Day, which occurred on April 22, 2014, at Fort Carson, Colorado.

  13. Making Memorial Day Plans? Be Sure They're Efficient

    Broader source: Energy.gov [DOE]

    Useful tips from Energy Savers - from cooking, to entertaining, to driving - how to stay energy efficient this Memorial Day weekend.

  14. U-245: Critical Java 0-day flaw exploited

    Broader source: Energy.gov [DOE]

    Targeted attacks exploiting a zero-day Java vulnerability to deliver the Poison Ivy RAT onto the unsuspecting victims' machines

  15. Nota Bene ~ News ~ Centenary of the Day Missions Library

    E-Print Network [OSTI]

    in practica l skills. Day envisioned a Library of Foreign Missions con- taining six types of materialNota Bene ~ News ~ Centenary of the Day Missions Library In the spring of 1891, Professor George Edward Day proposed to the "Friends of Christian Missions" the establishment of a new library at Yale

  16. China, March 2005 DAY 1: FLYING TO MUNICH & SHANGHAI

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    China, March 2005 DAY 1: FLYING TO MUNICH & SHANGHAI March 12. Saturday Waking up time: 8.30 am. I, lived one year in Beijing and told me lots of stuff about China, where to go, what to do, how in Namibia at Christmas, making me extremely jealous. DAY 2: FIRST DAY IN SHANGHAI, CHINA March 13. Sunday

  17. The 2014 Patton Symposium Hemiptera Day Thursday 4th

    E-Print Network [OSTI]

    Lazzaro, Brian

    The 2014 Patton Symposium Hemiptera Day Thursday 4th December 9.30 am- 3.30 pm, 2123 Comstock Hall for cathepsin in aphid transmission of circulative viruses 3.30 CLOSE To register for Hemiptera Day, go to: http://www.eventbrite.co.uk/e/the-2014-patton-symposium-hemiptera-day-tickets-13605643847 The password is: BTI event The 2014 Patton

  18. Certifications http://OperationsExcellence.utk.edu

    E-Print Network [OSTI]

    Grissino-Mayer, Henri D.

    Certifications http://OperationsExcellence.utk.edu Green, Black, Lean Six Sigma, and Master Black) Lean (one week of coursework) 2) Lean Six Sigma (two weeks of coursework) 3) Six Sigma (two weeks) lean Six Sigma Green Belt coursework: Location: Knoxville, Tennessee Tuition: $4,500 (5 days) or $3

  19. A review of extended-range operations by transport aircraft

    E-Print Network [OSTI]

    Simpson, R. W.

    1987-01-01T23:59:59.000Z

    Introduction: The safety of enroute operations of aircraft engaged in public transport has been a continuous concern since the early days of air transportation. There are a variety of inflight emergency situations which ...

  20. NSRC Industry Day, 2012 Overview of Research Activities

    E-Print Network [OSTI]

    Smith, Adam D.

    -off in multiuser systems; wireless ad hoc networks Information Content Capacity of Networks; quality- of-information . System Model iE is maxE )( pr 4/27/2012 E0 t T E1 E2 E3 s1 s2 s3s0 #12; Battery Capacity: Energy by National Science Foundation grants 1. CNS-NeTS (2007) 2. CNS-NeTS (2010) 3. CCF (2010) ARL: CTA in Network

  1. Technical Review of the CENWP Computational Fluid Dynamics Model of the John Day Dam Forebay

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01T23:59:59.000Z

    The US Army Corps of Engineers Portland District (CENWP) has developed a computational fluid dynamics (CFD) model of the John Day forebay on the Columbia River to aid in the development and design of alternatives to improve juvenile salmon passage at the John Day Project. At the request of CENWP, Pacific Northwest National Laboratory (PNNL) Hydrology Group has conducted a technical review of CENWP's CFD model run in CFD solver software, STAR-CD. PNNL has extensive experience developing and applying 3D CFD models run in STAR-CD for Columbia River hydroelectric projects. The John Day forebay model developed by CENWP is adequately configured and validated. The model is ready for use simulating forebay hydraulics for structural and operational alternatives. The approach and method are sound, however CENWP has identified some improvements that need to be made for future models and for modifications to this existing model.

  2. RADIO PROCEDURES DURING NORMAL OPERATING CONDITIONS CALLING AND COMMUNICATING TECHNIQUES

    E-Print Network [OSTI]

    Brody, James P.

    RADIO PROCEDURES DURING NORMAL OPERATING CONDITIONS CALLING AND COMMUNICATING TECHNIQUES The secret are going to say. Many people with radios have a tendency to talk and/or repeat too much. Say what you need until it is second nature. Practicing proper day-to-day radio procedures will make emergency radio

  3. Operations and compositions in transrecursive operators

    SciTech Connect (OSTI)

    Burgin, M.S.; Borodyanskii, Yu.M.

    1995-03-01T23:59:59.000Z

    The present study is a continuation of a study focusing on introduction and analysis of operations on transrecursive operators, which are similar to the operators considered in the theory of algorithms. Such operations may be standard product of algorithms) or special ({alpha}-disjunction and {alpha}-iteration. In some respects, these operations in the class of transrecursive operators are similar to their traditional analogs. In other respects, however, they are essentially different. For instance, they may have different types and modes. Specific features of operations on transrecursive operators are attributable to explicit omission of some restrictions on their construction compared with the construction of algorithms. The standard approaches to mathematical modeling of the concept of algorithm assume a number of essential restrictions. Specifically, they assume finiteness of (1) the input data arriving during a finite time interval; (2) the list of rules underlying the operations of the algorithm; (3) the transformations executed by a single operation; (4) the description of each rule; (5) the time to execute one operation; (6) the time to execute one operation; (7) the number of cycles that the algorithm executes in order to realize the mapping. In application to Turing machines, these restrictions imply finiteness of the initial word, finiteness of the command table of the read head, and ultimate stopping when the result is obtained after finitely many steps. Various classes of transrecursive operators are constructed by dropping various combinations of the {open_quotes}finiteness{close_quotes} restrictions. Two classes of transrecursive operators - the limit (inductive) Turing machines and transalgorithms - have been obtained by dropping respectively the assumption of finiteness of the number of execution cycles and the assumption of finiteness of the list of rules.

  4. Capacity Building on Access to Energy in Africa: Final Report

    E-Print Network [OSTI]

    Capacity Building on Access to Energy in Africa: Final Report Danish Support to EUEI Facilitation from African partner organisations and individuals Title: Capacity Building on Access to Energy (Danish Ministry of Foreign Affairs) Cover: Solar home system installed at house near Chipata, Eastern

  5. MASTERS REPORT ANALYSIS AND MODELING OF ACID NEUTRALIZING CAPACITY

    E-Print Network [OSTI]

    itself against acidification and is used to monitor the effect of acid rain on watersheds. From 1993MASTERS REPORT ANALYSIS AND MODELING OF ACID NEUTRALIZING CAPACITY IN THE MID-ATLANTIC HIGHLANDS UNIVERSITY #12;ABSTRACT Acid Neutralizing Capacity (ANC) is a measure of a solution's ability to buffer

  6. Multicomponent Adsorption and Chromatography with Uneven Saturation Capacities

    E-Print Network [OSTI]

    Gu, Tingyue

    Multicomponent Adsorption and Chromatography with Uneven Saturation Capacities Tingyue Gu, Gow, the extent of size exclusion is not the same for all the components. This often causes uneven adsorption capacity and vice versa. A study of size exclusion coupled with adsorption is a rel- atively new topic

  7. Asymptotic entanglement capacity of the Ising and anisotropic Heisenberg interactions

    E-Print Network [OSTI]

    Childs, A M; Verstraete, F; Vidal, G

    2003-01-01T23:59:59.000Z

    We compute the asymptotic entanglement capacity of the Ising interaction ZZ, the anisotropic Heisenberg interaction XX + YY, and more generally, any two-qubit Hamiltonian with normal form K = a XX + b YY. We also describe an entanglement assisted classical communication protocol using the Hamiltonian K with rate equal to the asymptotic entanglement capacity.

  8. Adaptive Online Battery Parameters/SOC/Capacity Co-estimation

    E-Print Network [OSTI]

    Chow, Mo-Yuen

    and even storage ageing of the battery. Following our previous publications in which we developed an onlineAdaptive Online Battery Parameters/SOC/Capacity Co-estimation Habiballah Rahimi-Eichi and Mo parameters to characterize the performance and application of a battery. Although the nominal capacity

  9. Prediction methods for capacity of drag anchors in clayey soils

    E-Print Network [OSTI]

    Yoon, Yeo Hoon

    2002-01-01T23:59:59.000Z

    A drag anchor is a marine foundation element, which is penetrated into the seabed by dragging in order to generate a required capacity. The holding capacity of a drag anchor in a particular soil condition is developed by soil resistance acting...

  10. On the Capacity of Hybrid Wireless Networks Benyuan Liu

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    On the Capacity of Hybrid Wireless Networks Benyuan Liu , Zhen Liu + , Don Towsley Department 704 Yorktown Heights, NY 10598 Abstract-- We study the throughput capacity of hybrid wireless networks stations are assumed to be connected by a high-bandwidth wired network and act as relays for wireless nodes

  11. A Framework for the Capacity Evaluation of Multihop Wireless Networks

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Framework for the Capacity Evaluation of Multihop Wireless Networks Herv´e Rivano CNRS - INRIA and localized CDS. Index Terms--network capacity, multihop wireless networks, upper and lower bounds, linear programing I. INTRODUCTION Ad hoc networks are spontaneous multihop topologies of wireless nodes

  12. Does Beamforming achieve Outage Capacity with Direction Feedback?

    E-Print Network [OSTI]

    Jafar, Syed A.

    Does Beamforming achieve Outage Capacity with Direction Feedback? Sudhir Srinivasa and Syed Ali Jafar Sriram Vishwanath Electrical Engineering and Computer Science Electrical and Computer Engineering: syed@ece.uci.edu, sudhirs@uci.edu Email: sriram@ece.utexas.edu Abstract We explore the outage capacity

  13. Energy-Efficient Capacity Optimization in Wireless Networks

    E-Print Network [OSTI]

    Wang, Yu

    Energy-Efficient Capacity Optimization in Wireless Networks Lu Liu, Xianghui Cao, Yu Cheng, Lili Du capacity in the most energy-efficient manner over a general large-scale wireless network, say, a multi numerical results demonstrate the energy efficiency improvement by the proposed energy-efficient

  14. Sizing Storage and Wind Generation Capacities in Remote Power Systems

    E-Print Network [OSTI]

    Victoria, University of

    Sizing Storage and Wind Generation Capacities in Remote Power Systems by Andy Gassner B Capacities in Remote Power Systems by Andy Gassner B.Sc., University of Wisconsin ­ Madison, 2003 Supervisory and small power systems. However, the variability due to the stochastic nature of the wind resource

  15. Figure 4: Case study network Maximising Renewable Capacity

    E-Print Network [OSTI]

    Harrison, Gareth

    . A variety of techniques have been used for distribution system optimisations. Here, Optimal Power Flow (OPF at several combinations of locations (DG at 0.9 lagging power factor). 3.5 MW of capacity is foundW is allocated at A. Without network reinforcement connection of the full 3.5 MW of mini-hydro capacity

  16. ORIGINAL ARTICLE Effect of Different Sitting Postures on Lung Capacity,

    E-Print Network [OSTI]

    Makhsous, Mohsen

    ORIGINAL ARTICLE Effect of Different Sitting Postures on Lung Capacity, Expiratory Flow, and Lumbar, Makhsous M. Effect of different sitting postures on lung capacity, expiratory flow, and lumbar lordosis. Arch Phys Med Rehabil 2006;87:504-9. Objective: To investigate the effect of sitting posture on lung

  17. Operating Permits (New Jersey)

    Broader source: Energy.gov [DOE]

    The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

  18. Cogeneration Operational Issues

    E-Print Network [OSTI]

    Williams, M.

    operations. Other operational issues also include utility transmission planning, generation planning and fuel mix decisions. All of these operational problems have an impact on the ratepayer in regard to quality of electric service and future rates. Both...

  19. 2014 Advanced Grid Modeling Peer Review Presentations - Day One...

    Broader source: Energy.gov (indexed) [DOE]

    Measurement-Based Tools For Proactive Operator Decision-Support - Alberto Del Rosso, EPRI Dynamic Paradigm for Grid Operations - Henry Huang, PNNL Development of Dynamic Models...

  20. Heat Transfer Operators Associated with Quantum Operations

    E-Print Network [OSTI]

    Ç. Aksak; S. Turgut

    2011-04-14T23:59:59.000Z

    Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

  1. Building Operator Certification

    E-Print Network [OSTI]

    Lilley, D.

    2013-01-01T23:59:59.000Z

    Building Operator Certification Energy Efficiency through Operator Training CATEE December 18, 2013 – San Antonio, TX Dennis Lilley, CEM, PMP ESL-KT-13-12-49 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16...-18 Building Operator Certification Energy Efficiency through Operator Training What is Building Operator Certification? Industry-recognized credential in energy efficient building operation practices Created with 100 industry experts Launched in 1996 9...

  2. NPR (New Production Reactor) capacity cost evaluation

    SciTech Connect (OSTI)

    none,

    1988-07-01T23:59:59.000Z

    The ORNL Cost Evaluation Technical Support Group (CETSG) has been assigned by DOE-HQ Defense Programs (DP) the task defining, obtaining, and evaluating the capital and life-cycle costs for each of the technology/proponent/site/revenue possibilities envisioned for the New Production Reactor (NPR). The first part of this exercise is largely one of accounting, since all NPR proponents use different accounting methodologies in preparing their costs. In order to address this problem of comparing ''apples and oranges,'' the proponent-provided costs must be partitioned into a framework suitable for all proponents and concepts. If this is done, major cost categories can then be compared between concepts and major cost differences identified. Since the technologies proposed for the NPR and its needed fuel and target support facilities vary considerably in level of technical and operational maturity, considerable care must be taken to evaluate the proponent-derived costs in an equitable manner. The use of cost-risk analysis along with derivation of single point or deterministic estimates allows one to take into account these very real differences in technical and operational maturity. Chapter 2 summarizes the results of this study in tabular and bar graph form. The remaining chapters discuss each generic reactor type as follows: Chapter 3, LWR concepts (SWR and WNP-1); Chapter 4, HWR concepts; Chapter 5, HTGR concept; and Chapter 6, LMR concept. Each of these chapters could be a stand-alone report. 39 refs., 36 figs., 115 tabs.

  3. Optimal monitoring and visualization of steady state power system operation 

    E-Print Network [OSTI]

    Xu, Bei

    2009-06-02T23:59:59.000Z

    3. Matrix conditioning . . . . . . . . . . . . . . . . . . . 22 E. Simulation Results . . . . . . . . . . . . . . . . . . . . . . 22 1. IEEE 14-bus system . . . . . . . . . . . . . . . . . . . 23 a. Case 1: State estimation without measure- ment... errors . . . . . . . . . . . . . . . . . . . . . 25 b. Case 2: Introducing bad data . . . . . . . . . . . 25 c. Case 3: Operating the UPFC at its capacity limit 26 d. Case 4: Controller parameter determination . . . 27 2. IEEE 57-bus system...

  4. Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading

    DOE Patents [OSTI]

    Perez, Richard

    2005-05-03T23:59:59.000Z

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply.

  5. Operation and Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: WALC-DSW (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  6. Operations Information for Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP...

  7. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  8. Operations Research Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as an Operations Research Analyst in the Generation Scheduling (PGS). The Operations Research Analyst is responsible for analytical work that involves...

  9. Empirical Estimates of 0Day Vulnerabilities in Control Systems

    SciTech Connect (OSTI)

    Miles A. McQueen; Wayne F. Boyer; Sean M. McBride; Trevor A. McQueen

    2009-01-01T23:59:59.000Z

    We define a 0Day vulnerability to be any vulnerability, in deployed software, which has been discovered by at least one person but has not yet been publicly announced or patched. These 0Day vulnerabilities are of particular interest when assessing the risk to well managed control systems which have already effectively mitigated the publicly known vulnerabilities. In these well managed systems the risk contribution from 0Days will have proportionally increased. To aid understanding of how great a risk 0Days may pose to control systems, an estimate of how many are in existence is needed. Consequently, using the 0Day definition given above, we developed and applied a method for estimating how many 0Day vulnerabilities are in existence on any given day. The estimate is made by: empirically characterizing the distribution of the lifespans, measured in days, of 0Day vulnerabilities; determining the number of vulnerabilities publicly announced each day; and applying a novel method for estimating the number of 0Day vulnerabilities in existence on any given day using the number of vulnerabilities publicly announced each day and the previously derived distribution of 0Day lifespans. The method was first applied to a general set of software applications by analyzing the 0Day lifespans of 491 software vulnerabilities and using the daily rate of vulnerability announcements in the National Vulnerability Database. This led to a conservative estimate that in the worst year there were, on average, 2500 0Day software related vulnerabilities in existence on any given day. Using a smaller but intriguing set of 15 0Day software vulnerability lifespans representing the actual time from discovery to public disclosure, we then made a more aggressive estimate. In this case, we estimated that in the worst year there were, on average, 4500 0Day software vulnerabilities in existence on any given day. We then proceeded to identify the subset of software applications likely to be used in some control systems, analyzed the associated subset of vulnerabilities, and characterized their lifespans. Using the previously developed method of analysis, we very conservatively estimated 250 control system related 0Day vulnerabilities in existence on any given day. While reasonable, this first order estimate for control systems is probably far more conservative than those made for general software systems since the estimate did not include vulnerabilities unique to control system specific components. These control system specific vulnerabilities were unable to be included in the estimate for a variety of reasons with the most problematic being that the public announcement of unique control system vulnerabilities is very sparse. Consequently, with the intent to improve the above 0Day estimate for control systems, we first identified the additional, unique to control systems, vulnerability estimation constraints and then investigated new mechanisms which may be useful for estimating the number of unique 0Day software vulnerabilities found in control system components. We proceeded to identify a number of new mechanisms and approaches for estimating and incorporating control system specific vulnerabilities into an improved 0Day estimation method. These new mechanisms and approaches appear promising and will be more rigorously evaluated during the course of the next year.

  10. Acceptance Priority Ranking & Annual Capacity Report

    SciTech Connect (OSTI)

    none,

    2004-07-31T23:59:59.000Z

    The Nuclear Waste Policy Act of 1982, as amended (the Act), assigns the Federal Government the responsibility for the disposal of spent nuclear fuel and high-level waste. Section 302(a) of the Act authorizes the Secretary to enter into contracts with the owners and generators of commercial spent nuclear fuel and/or high-level waste. The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) established the contractual mechanism for the Department's acceptance and disposal of spent nuclear fuel and high-level waste. It includes the requirements and operational responsibilities of the parties to the Standard Contract in the areas of administrative matters, fees, terms of payment, waste acceptance criteria, and waste acceptance procedures. The Standard Contract provides for the acquisition of title to the spent nuclear fuel and/or high-level waste by the Department, its transportation to Federal facilities, and its subsequent disposal.

  11. GEOPHYSICAL RESEARCH LETTERS, VOL. 0, NO. 0, PAGES 0-0, M 0, 2001 A new estimate for present-day Cocos-Caribbean

    E-Print Network [OSTI]

    DeMets, Chuck

    -day Cocos-Caribbean plate motion: Implications for slip along the Central American volcanic arc Charles De continuously-operating GPS sites on the Caribbean, North American, and Pacific plates are combined with 61 a new estimate of present-day Cocos-Caribbean plate motion. A comparison of the predicted Cocos-Caribbean

  12. Day-Ahead premiums on the Midwest ISO

    SciTech Connect (OSTI)

    Bowden, Nicholas; Hu, Su; Payne, James

    2009-03-15T23:59:59.000Z

    An examination of day-ahead premiums for the Midwest ISO from September 2005 to December 2007 reveals that premiums are positive and statistically significant across all five hubs, indicating inefficiency in the Midwest wholesale electricity market. Further, day-ahead premiums exhibit monthly seasonal variation with some indication of the day-ahead premiums declining over time in three of the five hubs. (author)

  13. Joint Capability Technology Demonstration (JCTD) Industry Day Agenda

    Broader source: Energy.gov [DOE]

    Agenda outlines the activities of the 2014 Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD) Industry Day in Fort Carson, Colorado.

  14. DOE Headquarters Earth Day 2015 | Department of Energy

    Office of Environmental Management (EM)

    Earth Day's 45th anniversary is on April 22, 2015. The celebration will showcase interactive, eco-friendly exhibits and activities to raise awareness of environmental issues...

  15. AMO Industry Day Workshop on Upcoming Smart Manufacturing FOA

    Broader source: Energy.gov [DOE]

    AMO will host an Industry Day workshop to explain the concept, vision, and technology needs associated with support for a Clean Energy Manufacturing Innovation Institute on Smart Manufacturing.

  16. 2012 Smart Grid Peer Review Presentations - Day 2 First Afternoon...

    Broader source: Energy.gov (indexed) [DOE]

    First Afternoon Session 2012 Smart Grid Peer Review Presentations - Day 2 First Afternoon Session The Office of Electricity Delivery and Energy Reliability held its bi-annual peer...

  17. 2012 Smart Grid Peer Review Presentations - Day 1 Afternoon Session...

    Broader source: Energy.gov (indexed) [DOE]

    from Day 1 afternoon sessions are below. Moderators: Eric Lightner and Merrill Smith 2012 SG Peer Review - GridWise Architecture Council - Ron Melton, PNNL 2012 SG Peer...

  18. The Power of Choice ? Cold War Patriots Day of Remembrance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to control his choices while in prison in Zimbabwe as presented at the recent Cold War Patriots' Day of Remembrance. His presentations were inspiring and his personal example...

  19. Argonne Celebrates Earth Day 2013: It's Easy Being Green

    ScienceCinema (OSTI)

    Paul Kearns; Pam Sydelko; Ray Bair; Stephen Streiffer; Brian Stephenson;

    2013-06-10T23:59:59.000Z

    Argonne's April 23, 2013 Earth Day celebration featured "green" R&D conducted at the lab and interactive displays and fun activities that engage the laboratory community.

  20. Geothermal: Sponsored by OSTI -- IGPPS Days Program Review Administrat...

    Office of Scientific and Technical Information (OSTI)

    IGPPS Days Program Review Administrative Remarks Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us HomeBasic Search About Publications Advanced Search New...

  1. National Lab Day Fact Sheets | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lab Day Fact Sheets Secretary Ernest Moniz learns about the Labs' work in high performance computing and additive manufacturing. | Photo courtesy of Sarah Gerrity, Energy...

  2. Argonne Celebrates Earth Day 2013: It's Easy Being Green

    SciTech Connect (OSTI)

    Paul Kearns; Pam Sydelko; Ray Bair; Stephen Streiffer; Brian Stephenson

    2013-04-17T23:59:59.000Z

    Argonne's April 23, 2013 Earth Day celebration featured "green" R&D conducted at the lab and interactive displays and fun activities that engage the laboratory community.

  3. 2012 Smart Grid Peer Review Presentations - Day 2 Smart Grid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Grid Panel Discussion 2012 Smart Grid Peer Review Presentations - Day 2 Smart Grid Panel Discussion The Office of Electricity Delivery and Energy Reliability held its...

  4. AMO Industry Day Workshop, February 25th, Targets Smart Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addthis AMO will host an Industry Day workshop to explain the concept, vision, and technology needs associated with support for a Clean Energy Manufacturing Innovation Institute...

  5. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Powe

  6. OPERATIONS MANAGEMENT Spring 2008

    E-Print Network [OSTI]

    Almor, Amit

    the operations and supply chain strategy. This survey course in operations management introduces students1 MGSC 395 OPERATIONS MANAGEMENT Spring 2008 Course Syllabus Instructor: Professor Anand Nair Class MATERIALS Required Text Books Textbook: Krajewski, Lee, Ritzman, Larry, and Malhotra, Manoj. Operations

  7. Financial Plan Operating and Capital

    E-Print Network [OSTI]

    Hemami, Sheila S.

    /Rand Hall Phase I 93 Milstein Hall Parking Garage 94 New Chiller Capacity 95 N. Martha Van Rensselaer

  8. Heat capacity of liquids: an approach from the solid phase

    E-Print Network [OSTI]

    Kostya Trachenko

    2008-08-20T23:59:59.000Z

    We calculate the energy and heat capacity of a liquid on the basis of its elastic properties and vibrational states. The experimental decrease of liquid heat capacity with temperature is attributed to the increasing loss of two transverse modes with frequency $\\omegaliquid relaxation time. In a simple model, liquid heat capacity is related to viscosity and is compared with the experimental data of mercury. We also calculate the vibrational energy of a quantum liquid, and show that transverse phonons can not be excited in the low-temperature limit. Finally, we discuss the implications of the proposed approach to liquids for the problem of glass transition.

  9. Load controller and method to enhance effective capacity of a photovoltaic power supply

    DOE Patents [OSTI]

    Perez, Richard (Delmar, NY)

    2000-01-01T23:59:59.000Z

    A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The renewable supply may comprise, for example, a photovoltaic power supply or a wind-based power supply.

  10. Toward Under-Ice Operations with Hybrid Underwater Robotic Vehicles

    E-Print Network [OSTI]

    Whitcomb, Louis L.

    techniques commonly employed for blue-water oceanography are unsuit- able for operations in ice covered seas, present day blue-water oceanographic methods for survey and sampling are extensive--they include ship for blue-water (i.e. not Arctic) operations: WHOI's Nereus HROV [8], [9], [42], SAAB Underwater Systems

  11. Operator pencil passing through a given operator

    SciTech Connect (OSTI)

    Biggs, A., E-mail: khudian@manchester.ac.uk, E-mail: adam.biggs@student.manchester.ac.uk; Khudaverdian, H. M., E-mail: khudian@manchester.ac.uk, E-mail: adam.biggs@student.manchester.ac.uk [School of Mathematics, University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom)

    2013-12-15T23:59:59.000Z

    Let ? be a linear differential operator acting on the space of densities of a given weight ?{sub 0} on a manifold M. One can consider a pencil of operators ?-circumflex(?)=(?{sub ?}) passing through the operator ? such that any ?{sub ?} is a linear differential operator acting on densities of weight ?. This pencil can be identified with a linear differential operator ?-circumflex acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e., pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular, we analyze the relation between these two concepts, and apply it to the study of diff?(M)-equivariant liftings. Finally, we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings. Our constructions can be considered as a generalisation of equivariant quantisation.

  12. Capacity dynamics of feed-forward, flow-matching networks exposed to random disruptions 

    E-Print Network [OSTI]

    Savachkin, Aliaksei

    2006-10-30T23:59:59.000Z

    businesses including GM, BP, Ford, Goodyear and Procter & Gamble to suspend their manufacturing for the duration of the conflict. Enterprises are consolidating their internal and external suppliers to gain economies of scale at the expense to exposure... Acute Respiratory Syndrome (SARS) in China and Singapore forced most electronics and hardware factories there to suspend operations for days, and several Motorola plants shut down. In December 2002, a political strike in Venezuela made transnational...

  13. Information Capacity of an Energy Harvesting Sensor Node

    E-Print Network [OSTI]

    Viswanath, Pramod

    practical architectures. Our main result is the characterization of the Shannon capacity. INTRODUCTION Sensor nodes are often deployed for monitoring a random field. These nodes are characterized by limited battery power, computational resources and storage space. Once deployed, the battery

  14. Capacity Requirements to Support Inter-Balancing Area Wind Delivery

    SciTech Connect (OSTI)

    Kirby, B.; Milligan, M.

    2009-07-01T23:59:59.000Z

    Paper examines the capacity requirements that arise as wind generation is integrated into the power system and how those requirements change depending on where the wind energy is delivered.

  15. Increasing Freeway Merge Capacity Through On-Ramp Metering

    E-Print Network [OSTI]

    Rudjanakanoknad, Jittichai

    2005-01-01T23:59:59.000Z

    Hall, F. L. and Agywmang-Duah, K. (1991), Freeway capacity1990; Hall and Agyemang-Duah, 1991). As explained below,Later, Hall and Agyemang- Duah (1991) studied a freeway

  16. Minimum Cost Capacity Installation for Multicommodity Network Flows \\Lambda

    E-Print Network [OSTI]

    Bienstock, Daniel

    Capacity Installation (MCCI) problem. Applications of MCCI are commonly seen in the design for MCCI and then we transform this for­ mulation to a lower dimensional space by projecting out all

  17. Global Installed Capacity of Coal Fired Power Generation to Reach...

    Open Energy Info (EERE)

    Global Installed Capacity of Coal Fired Power Generation to Reach 2,057.6 GW by 2019 Home > Groups > Increase Natural Gas Energy Efficiency John55364's picture Submitted by...

  18. Capacity planning and admission control policies for intensive care units

    E-Print Network [OSTI]

    Chaiwanon, Wongsakorn

    2010-01-01T23:59:59.000Z

    Poor management of the patient flow in intensive care units (ICUs) causes service rejections and presents significant challenges from the standpoint of capacity planning and management in ICUs. This thesis reports on the ...

  19. High capacity stabilized complex hydrides for hydrogen storage

    DOE Patents [OSTI]

    Zidan, Ragaiy; Mohtadi, Rana F; Fewox, Christopher; Sivasubramanian, Premkumar

    2014-11-11T23:59:59.000Z

    Complex hydrides based on Al(BH.sub.4).sub.3 are stabilized by the presence of one or more additional metal elements or organic adducts to provide high capacity hydrogen storage material.

  20. Saudi production capacity climbing to 10 million b/d

    SciTech Connect (OSTI)

    Not Available

    1994-07-11T23:59:59.000Z

    Saudi Arabia this year is completing its expansion of production capacity and developing recent discoveries to enhance export flexibility. The 3 million b/d capacity expansion to 10 million b/d, announced in 1989, is on target for completion by year end 1994. Most of the effort involves restoration of mothballed production equipment and installation of several gas-oil separation plants (GOSPs) in existing fields. But Saudi Arabian Oil Co. (Saudi Aramco) also this year will start up production of extra-light oil from a new field in the central part of the kingdom. Start-up of Hawtah area production demonstrates success of an oil search Aramco began after receiving exclusive exploration rights to nearly all of Saudi Arabia's prospective area in 1986. From new fields and traditional producing areas, therefore, Saudi Arabia has the potential to expand production capacity beyond 10 million b/d. The paper describes the development of the extra capacity.

  1. Development of large-capacity gas-insulated transformer

    SciTech Connect (OSTI)

    Takahashi, E.; Tanaka, K. [Tokyo Electric Power Co., Ltd. (Japan)] [Tokyo Electric Power Co., Ltd. (Japan); Toda, K.; Ikeda, M.; Teranishi, T.; Inaba, M.; Yanari, T. [Toshiba Corp., Kawasaki (Japan)] [Toshiba Corp., Kawasaki (Japan)

    1996-04-01T23:59:59.000Z

    Concentrations of population and business activities result in high electricity demand in urban areas. This requires the construction of large-capacity underground substations. Oilless, non-flammable and non-explosive equipment is recommended for underground substations. Therefore, several types of large-capacity gas-insulated transformer have been developed. Because the gas forced cooling type was considered to be available up to approximately 60 MVA, all of these gas-insulated transformers are liquid cooled. But the liquid cooling type has the disadvantage of a complex structure for liquid cooling. For this reason, the authors have been studying the development of a simple design for a gas forced cooling, large-capacity gas-insulated transformer. This paper discusses research and development of cooling and insulation technology for a large-capacity gas-insulated transformer and the development of a 275 kV, 300 MVA gas-insulated transformer.

  2. Design and Evaluation of Novel High Capacity Cathode Materials...

    Broader source: Energy.gov (indexed) [DOE]

    the reaction is, in turn, intercalated into the negative electrode (i.e. graphite, graphene composites, intermetallics, Si-C composites, high-capacity TiO 2 (B bronze), TiO 2...

  3. Capacity planning and change management in an aerospace overhaul cell

    E-Print Network [OSTI]

    Walker, David, M.B.A. Massachusetts Institute of Technology

    2013-01-01T23:59:59.000Z

    Purpose - This thesis analyzes the transformation of the Small Components Cell in Pratt & Whitney's aftermarket division through lean manufacturing techniques. The thesis focuses on use of a labor capacity planning model, ...

  4. Creative capacity building in post-conflict Uganda

    E-Print Network [OSTI]

    Taha, Kofi A. (Kofi Abdul Malik)

    2011-01-01T23:59:59.000Z

    Creative Capacity Building (CCB) is a methodology that emphasizes the ability of people living in poverty to create livelihood technologies, i.e., machines and tools that increase income, improve health and safety, decrease ...

  5. The multicast capacity region of large wireless networks

    E-Print Network [OSTI]

    Shah, Devavrat

    We study the problem of determining the multicast capacity region of a wireless network of n nodes randomly located in an extended area and communicating with each other over Gaussian fading channels. We obtain an explicit ...

  6. Predictive capacity planning modeling with tactical and strategic applications

    E-Print Network [OSTI]

    Zeppieri, Michael A. (Michael Anthony), 1975-

    2004-01-01T23:59:59.000Z

    The focus of my internship was the development of a predictive capacity planning model to characterize the storage requirements and space utilization for Amazon's Campbellsville (SDF) Fulfillment Center (FC). Amazon currently ...

  7. Real options approach to capacity planning under uncertainty

    E-Print Network [OSTI]

    Mittal, Geetanjali, 1979-

    2004-01-01T23:59:59.000Z

    This thesis highlights the effectiveness of Real Options Analysis (ROA) in capacity planning decisions for engineering projects subject to uncertainty. This is in contrast to the irreversible decision-making proposed by ...

  8. Nitrogen expander cycles for large capacity liquefaction of natural gas

    SciTech Connect (OSTI)

    Chang, Ho-Myung; Park, Jae Hoon; Gwak, Kyung Hyun [Hong Ik University, Department of Mechanical Engineering, Seoul, 121-791 (Korea, Republic of); Choe, Kun Hyung [Korea Gas Corporation, Incheon, 406-130 (Korea, Republic of)

    2014-01-29T23:59:59.000Z

    Thermodynamic study is performed on nitrogen expander cycles for large capacity liquefaction of natural gas. In order to substantially increase the capacity, a Brayton refrigeration cycle with nitrogen expander was recently added to the cold end of the reputable propane pre-cooled mixed-refrigerant (C3-MR) process. Similar modifications with a nitrogen expander cycle are extensively investigated on a variety of cycle configurations. The existing and modified cycles are simulated with commercial process software (Aspen HYSYS) based on selected specifications. The results are compared in terms of thermodynamic efficiency, liquefaction capacity, and estimated size of heat exchangers. The combination of C3-MR with partial regeneration and pre-cooling of nitrogen expander cycle is recommended to have a great potential for high efficiency and large capacity.

  9. Developing A New High Capacity Anode With Long Cycle Life

    Broader source: Energy.gov (indexed) [DOE]

    more than 1000 mAhg with poor cyleability. * The formation of Sn x Co y C z and MO composite could lead to the increase in the capacity, reduce the amount of cobalt in the...

  10. Dynamics of social contagions with limited contact capacity

    E-Print Network [OSTI]

    Wang, Wei; Zhu, Yu-Xiao; Tang, Ming; Zhang, Yi-Cheng

    2015-01-01T23:59:59.000Z

    Individuals are always limited by some inelastic resources, such as time and energy, which restrict them to dedicate to social interaction and limit their contact capacity. Contact capacity plays an important role in dynamics of social contagions, which so far has eluded theoretical analysis. In this paper, we first propose a non-Markovian model to understand the effects of contact capacity on social contagions, in which each individual can only contact and transmit the information to a finite number of neighbors. We then develop a heterogeneous edge-based compartmental theory for this model, and a remarkable agreement with simulations is obtained. Through theory and simulations, we find that enlarging the contact capacity makes the network more fragile to behavior spreading. Interestingly, we find that both the continuous and discontinuous dependence of the final adoption size on the information transmission probability can arise. And there is a crossover phenomenon between the two types of dependence. More ...

  11. Fail Safe Design for Large Capacity Lithium-ion Batteries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fail Safe Design for Large Capacity Lithium-ion Batteries NREL Commercialization & Tech Transfer Webinar March 27, 2011 Gi-Heon Kim gi-heon.kim@nrel.gov John Ireland, Kyu-Jin Lee,...

  12. Why Are We Talking About Capacity Markets? (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.

    2011-06-01T23:59:59.000Z

    Capacity markets represent a new and novel way to achieve greater economic use of variable generation assets such as wind and solar, and this concept is discussed in this presentation.

  13. Creative agencies : a model for building community capacity

    E-Print Network [OSTI]

    Ramaccia, Elizabeth M. (Elizabeth Marie)

    2011-01-01T23:59:59.000Z

    This research investigates how existing initiatives based in artistic and non-artistic disciplines build indigenous capacity for leadership in disenfranchised communities through the application of the creative process. ...

  14. Strategies for Sharing Bottleneck Capacity among Buses and Cars

    E-Print Network [OSTI]

    Guler, Sukran Ilgin

    2012-01-01T23:59:59.000Z

    at first, since bus-car sharing strategies for facilities ofsharing the middle link’s median lane between cars andfor Sharing Bottleneck Capacity among Buses and Cars by

  15. ,"New York Natural Gas Underground Storage Capacity (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    ,,"(202) 586-8800",,,"2262015 9:17:17 AM" "Back to Contents","Data 1: New York Natural Gas Underground Storage Capacity (MMcf)" "Sourcekey","N5290NY2"...

  16. An Efficient Algorithm for Computing Robust Minimum Capacity st Cuts

    E-Print Network [OSTI]

    2008-04-03T23:59:59.000Z

    Apr 3, 2008 ... under data uncertainty such as in open-pit mining or scheduling jobs on ..... maximum flow problem in that arcs e1,e2, ··· ,ei had their capacities ...

  17. "Assessment of the Adequacy of Natural Gas Pipeline Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    its "Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States" report. The report is now available for downloading. In 2005-06, the Office of...

  18. Offshore Wind Energy Market Installed Capacity is Anticipated...

    Open Energy Info (EERE)

    Offshore Wind Energy Market Installed Capacity is Anticipated to Reach 52,120.9 MW by 2022 Home > Groups > Renewable Energy RFPs Wayne31jan's picture Submitted by Wayne31jan(150)...

  19. Seismic Capacity of Threaded, Brazed, and Grooved Pipe Joints

    Office of Environmental Management (EM)

    SEISMIC CAPACITY OF THREADED, BRAZED AND GROOVED PIPE JOINTS Brent Gutierrez, PhD, PE George Antaki, PE, F.ASME DOE NPH Conference October 25-26, 2011 Motivation * Understand the...

  20. Tracking Progress Last updated 10/7/2013 Installed Capacity 1

    E-Print Network [OSTI]

    Tracking Progress Last updated 10/7/2013 Installed Capacity 1 Installed Capacity The capacities 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Capacity (MW) Wind Solar Small Hydro Large Hydro Reporting #12;Tracking Progress Last updated 10/7/2013 Installed Capacity 2 Table 1 provides the data

  1. ENGINEERS' DAY 2011 ACTIVITIES 1800 Engineering Hall, 1415 Engineering Drive

    E-Print Network [OSTI]

    Sheridan, Jennifer

    ENGINEERS' DAY 2011 ACTIVITIES 1800 Engineering Hall, 1415 Engineering Drive 5:30 SOCIAL HOUR · Distinguished Achievement Awards · Early-Career Achievement Award · College of Engineering faculty and staff, Chair, E-Day Committee Department of Biomedical Engineering 8:50 COLLEGE UPDATE Dean Paul S. Peercy

  2. WCROC Organic Dairy Day Tuesday, August 13, 2013

    E-Print Network [OSTI]

    Blanchette, Robert A.

    at 8008768636. Printed on recycled and recyclable paper with at least 10 percent postconsumer waste materialWCROC Organic Dairy Day Tuesday, August 13, 2013 West Central Research and Outreach Center. For More Information Contact: Brad Heins, 3205891711 or hein0106@umn.edu WCROC Organic Dairy Day

  3. WCROC Organic Dairy Day Tuesday, August 13, 2013

    E-Print Network [OSTI]

    Blanchette, Robert A.

    -876-8636. Printed on recycled and recyclable paper with at least 10 percent postconsumer waste material. All rightsWCROC Organic Dairy Day Tuesday, August 13, 2013 West Central Research and Outreach Center,Morris, MN SEMINARS AND PASTURE TOURS ­ 10AM TO 3PM WCROC Organic Dairy Day Tuesday, August 13, 2013 West

  4. Water is Theme For UNL at September's Husker Harvest Days

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    Water is Theme For UNL at September's Husker Harvest Days University of Nebraska's Institute of Agriculture and Natural Resources (IANR) will highlight the latest in water research, education Harvest Days show in Grand Island this September. "We are very excited to be rolling out a very new look

  5. Imagine the result [A Day in the Life of an

    E-Print Network [OSTI]

    Militzer, Burkhard

    Assessment, Management & Remediation · Sustainability Services · Etc. #12;© 2011 ARCADIS20 April 20115 Health: · Well installations · Soil boring installations · Soil/rock core logging · Aquifer pump tests Field Day Soil Vapor Sampling #12;© 2011 ARCADIS20 April 201118 A Typical Field Day Collecting Soil

  6. LBID-2488, Rev 1 LBNL Monitor Day-to-

    E-Print Network [OSTI]

    LBID-2488, Rev 1 LBNL Monitor Day-to- Day Work Activities Notification Conduct Investigation activities. 2. LBNL personnel, subcontractor, or guest creates or witnesses an adverse ES&H occurrence. 3 approve all final ORPS reports, including corrective actions. Figure 3.1. LBNL Occurrence Reporting

  7. IMAGES IN EMBRYOLOGY............................................................................ Development of the human heart: days 1521

    E-Print Network [OSTI]

    Boyer, Edmond

    ............................................................................ Development of the human heart: days 15­21 I n this series, three dimensional computer graphics are used to present the anatomical structures involved in the different stages of normal human heart development visit: www.virtual-heart- development.univ-rennes1.fr During the third week of gestation (days 15

  8. Industrial Affiliates Day 2007 Friday, April 13, 2007

    E-Print Network [OSTI]

    Van Stryland, Eric

    ppk Industrial Affiliates Day 2007 Friday, April 13, 2007 Ultra-Short Pulse Lasers and Applications.............................................................page 4 Raydiance Ultra-Short Pulse Laser Platform: Gateway to the Light Age - Dr. Cumbo Affiliates Day ­ Friday April 13, 2007 Theme: Ultra-Short Pulse Lasers & Applications Morning Session ­ UCF

  9. Operation of Distributed Generation Under Stochastic Prices

    SciTech Connect (OSTI)

    Siddiqui, Afzal S.; Marnay, Chris

    2005-11-30T23:59:59.000Z

    We model the operating decisions of a commercial enterprisethatneeds to satisfy its periodic electricity demand with either on-sitedistributed generation (DG) or purchases from the wholesale market. Whilethe former option involves electricity generation at relatively high andpossibly stochastic costs from a set of capacity-constrained DGtechnologies, the latter implies unlimited open-market transactions atstochastic prices. A stochastic dynamic programme (SDP) is used to solvethe resulting optimisation problem. By solving the SDP with and withoutthe availability of DG units, the implied option values of the DG unitsare obtained.

  10. Statewide Electricity and Demand Capacity Savings from the Implementation of IECC Code in Texas: Analysis for Single-Family Residences

    E-Print Network [OSTI]

    Kim, H.; Baltazar, J.C.; Haberl, J.; Lewis, C.; Yazdani, B.

    2011-01-01T23:59:59.000Z

    STATEWIDE ELECTRICITY AND DEMAND CAPACITY SAVINGS FROM THE IMPLEMENTATION OF IECC CODE IN TEXAS: ANALYSIS FOR SINGLE?FAMILY RESIDENCES 11th International Conference for Enhanced Building Operations New York City, October 18 ? 20, 2011 Hyojin...&M University System Statewide Electricity and Demand Savings from the IECC Code in TX 11th ICEBO Conference Oct. 18 ? 20, 2011 2 Outline Introduction Methodology Base?Case Building Results Summary Statewide Electricity and Demand Savings from the IECC...

  11. Site Name : Pedregal permanent station Author : Vigny Site Code :P E D R date : year 2006 month 11 day 21

    E-Print Network [OSTI]

    Vigny, Christophe

    with a standard car. ADDITIONAL INFORMATION Operational since 21/11/2006 (day 325 of year 2006) Charger : Mascot SKETCH MAP Access to the Hacienda #12;PEDR 4/6 #12;PEDR 5/6 Receiver in electric box on pole and antenna) Trimble Zephyr antenna Antenna 10m antenna cable in pipe Pine pole (4m high) Electric line (220v) Outcrop

  12. GASCAP: Wellhead Gas Productive Capacity Model documentation, June 1993

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    The Wellhead Gas Productive Capacity Model (GASCAP) has been developed by EIA to provide a historical analysis of the monthly productive capacity of natural gas at the wellhead and a projection of monthly capacity for 2 years into the future. The impact of drilling, oil and gas price assumptions, and demand on gas productive capacity are examined. Both gas-well gas and oil-well gas are included. Oil-well gas productive capacity is estimated separately and then combined with the gas-well gas productive capacity. This documentation report provides a general overview of the GASCAP Model, describes the underlying data base, provides technical descriptions of the component models, diagrams the system and subsystem flow, describes the equations, and provides definitions and sources of all variables used in the system. This documentation report is provided to enable users of EIA projections generated by GASCAP to understand the underlying procedures used and to replicate the models and solutions. This report should be of particular interest to those in the Congress, Federal and State agencies, industry, and the academic community, who are concerned with the future availability of natural gas.

  13. Operational Impacts of Large Deployments of Offshore Wind (Poster)

    SciTech Connect (OSTI)

    Ibanez, E.; Heaney, M.

    2014-10-01T23:59:59.000Z

    The potential operational impact of deploying 54 GW of offshore wind in the United States was examined. The capacity was not evenly distributed; instead, it was concentrated in regions with better wind quality and close to load centers (Table 1). A statistical analysis of offshore wind power time series was used to assess the effect on the power system. The behavior of offshore wind resembled that of onshore wind, despite the former presenting higher capacity factors, more consistent power output across seasons, and higher variability levels. Thus, methods developed to manage onshore wind variability can be extended and applied to offshore wind.

  14. CARBON MANAGEMENT STRATEGIES FOR U.S. ELECTRICITY GENERATION CAPACITY: A VINTAGE-BASED APPROACH

    SciTech Connect (OSTI)

    Dahowski, Robert T.; Dooley, James J.

    2004-06-01T23:59:59.000Z

    This paper examines the stock of fossil-fired power generation capacity in the United States within the context of climate change. At present, there are over 1,337 fossil-fired power generating units of at least 100 MW in capacity, that began operating between the early 1940s and today. Together these units provide some 453 GW of electric power. Launching a national program to accelerate the early retirement of this stock or tearing them down and undertaking near-term brownfield redevelopment with advanced power cycle technologies as a means of addressing their greenhouse gas emissions will not be a sensible option for all of these units. Considering a conservative 40-year operating life, there are over 667 existing fossil-fired power plants, representing a capacity of over 291 GW, that have at least a decades worth of productive life remaining. This paper draws upon specialized tools developed by Battelle to analyze the characteristics of this subset of U.S. power generation assets and explore the relationships between plant type, location, emissions, and vintage. It examines the use of retrofit carbon capture technologies, considering criteria such as the proximity of these power plants to geologic reservoirs, to assess the potential that geologic sequestration of CO2 offers these plants for managing their emissions. The average costs for retrofitting these plants and sequestering their CO2 into nearby geologic reservoirs are presented. A discussion of a set of planned U.S. fossil-fired power projects within this context is also included.

  15. Development of a large-capacity superconducting cable for 100 kVA-class power transformers

    SciTech Connect (OSTI)

    Funaki, K.; Iwakuma, M.; Satoh, S.; Hiramatsu, M.; Takeo, M.; Yamafuji, K.; Nonaka, S. (Kyushu Univ., Fukuoka (Japan). Faculty of Engineering); Hoshino, M.; Simada, M.; Yoneda, E.S. (Toshiba Corp., Yokohama (JP))

    1992-01-01T23:59:59.000Z

    This paper reports that the authors have designed and fabricated a large-capacity superconducting cable for 1000k VA-class power transformers. The cable is a triply-stacked multi-strand (6 {times} 6 {times} 6) type. The elementary strand has 19,050 NbTi filaments of 0.63 mm thick in CuNi matrix. The test cable is installed as the secondary winding in a superconducting transformer with iron core in a room-temperature space. The primary winding is the second-level subcable of the secondary one and the turn ratio is nearly 14. The designed capacity of the test cable is 4.545 kA at the secondary voltage of 220V. The peak value of the current, 6.43kA (peak), is 78% of the critical current on the load line. The maximum current of the cable at 60Hz operation was 3.78kA (peak). The attained level of the secondary winding is 47% of the critical current. In the 60Hz operation of a small coil wound by the test cable, premature quench was initiated from the terminals of the cable connected with copper plates. It is suggested from the experimental results that the degradation in maximum current of the test cable is related to current transfer between the cable and the copper terminal plates.

  16. The Mochovce final treatment center for liquid radioactive waste introduced to active trial operation

    SciTech Connect (OSTI)

    Krajc, T.; Stubna, M.; Kravarik, K.; Zatkulak, M. [VUJE Trnava, Inc. (Slovakia); Slezak, M.; Remias, V. [Javys - Jadrova a vyradovacia spolocnost, a.s. - Nuclear and Decommissioning Company, plc., Tomasikova 22, 821 02 Bratislava (Slovakia)

    2007-07-01T23:59:59.000Z

    The Final Treatment Centre (FTC) for Mochovce Nuclear Power Plant (NPP) have been designed for treatment and final conditioning of radioactive liquid and wet waste produced by named NPP equipped with Russian VVER-440 type of reactors. Treated wastes comprise radioactive concentrates, spent resin and sludge. VUJE Inc. as an experienced company in field of treatment of radioactive waste in Slovakia has been chosen as main contractor for technological part of FTC. During the realisation of project the future operator of Centre required the contractor to solve the treatment of wastes produced in the process of NPP A-1 decommissioning. On the basis of this requirement the project was modified in order to enable manipulations with waste products from A-1 NPP transported to Centre in steel drums. The initial project was prepared in 2003. The design and manufacture of main components were performed in 2004 and 2005. FTC civil works started in August 2004. Initial nonradioactive testing of the system parts were carried out from April to September 2006, then the tests of systems started with model concentrates and non-radioactive resins. After the processes evaluation the radioactive test performed from February 2007. A one-year trial operation of facility is planned for completion during 2007 and 2008. The company JAVYS, Inc. is responsible for radioactive waste and spent fuel treatment in the Slovak republic and will operate the FTC during trial operation and after its completion. This Company has also significant experience with operation of Jaslovske Bohunice Treatment Centre. The overall capacity of the FTC is 820 m{sup 3}/year of concentrates and 40 m{sup 3}/year of spent resin and sludge. Bituminization and cementation were provided as main technologies for treatment of these wastes. Treatment of concentrate is performed by bituminization on Thin Film Evaporator with rotating wiping blades. Spent resin and sludge are decanted, dried and mixed with bitumen in blade homogeniser. The bitumen product is discharged into 200 dm{sup 3} steel drums. Drums with bitumen product or drums originated from A-1 NPP are loaded into Fibre Reinforced Concrete containers (FRC) and grouted with cement. Cement grout is prepared from the mixture of cement, additive and radioactive over-concentrate. By formulating the cement grout with evaporator concentrates the maximum radioactivity is fixed in cement matrix and volume of final waste product is minimized. A batch mixer with rotating blades is used to produce the cement grout. The grouted FRC containers are stored in the expedition hall and after 28 days of curing are transported to final disposal. After the start of routine operation, the FTC provides treatment for all liquid and wet LLW produced from the operation of the Mochovce NPP. The final product of the FTC is a FRC loaded with bitumen product in drums and filled with radioactive cement product. This container meets all limits for final disposal in the National Radioactive Waste Repository at Mochovce. This paper introducing the main parts of FTC and describes the technological procedures including the basic technological parameters for both used technologies, their working capacity and the overall waste flow. The evaluation of experience gained in the phases of Centre construction and commissioning and partially trial operation as well is a part of this paper (Evaluation of completion works process and time schedule, the process of individual system parts testing, testing of systems using model media, radioactive testing and trial operation). (authors)

  17. Ares I-X 30 Day ReportAres I-X 30 Day Report Bob Ess, Mission Manager

    E-Print Network [OSTI]

    Waliser, Duane E.

    Ares I-X 30 Day ReportAres I-X 30 Day Report Bob Ess, Mission Manager Marshall Smith, SE&I Chief Bob Ess, Mission Manager Marshall Smith, SE&I Chief December 3, 2009December 3, 2009 www.nasa.gov #12

  18. Experimental and numerical study of the behavior of three-way catalytic converters under different engine operation conditions

    E-Print Network [OSTI]

    Zhang, Yuetao

    2005-01-01T23:59:59.000Z

    The thesis reports the studies on how the three-way catalytic converters behave under different operation conditions. The main focus of the work is in the oxygen storage capacity of the three-way catalyst. Rich-to-lean ...

  19. Determining the Capacity Value of Wind: An Updated Survey of Methods and Implementation; Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Porter, K.

    2008-06-01T23:59:59.000Z

    This paper summarizes state and regional studies examining the capacity value of wind energy, how different regions define and implement capacity reserve requirements, and how wind energy is defined as a capacity resource in those regions.

  20. Storage Ring Operation Modes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in...

  1. Aerosol Sampler Operations Manual

    E-Print Network [OSTI]

    Fischer, Emily V.

    -1123 Laboratory FAX (916) 752-4107 Standard Operating Procedures Technical Information Document TI 201A #12;TI 201.................................................................................................................................................. 3 1.0 Weekly Maintenance ProceduresIMPROVE Aerosol Sampler Operations Manual February 10, 1997 Air Quality Group Crocker Nuclear

  2. Climate Data Operators (CDO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression,...

  3. Reservoir Operation in Texas

    E-Print Network [OSTI]

    Wurbs, Ralph A.

    management of the surface water resources of the various river basins of the state. The operation of these essential water control facilities is examined in this report. Reservoir operation is viewed here from the perspective of deciding how much water...

  4. Lyondell`s new isobutylene route could fuel an MTBE capacity boost

    SciTech Connect (OSTI)

    Rotman, D.; Wood, A.

    1992-03-25T23:59:59.000Z

    Driven by the hot growth prospects for methyl tert-butyl ether (MTBE), Lyondell Petrochemical (Houston) has developed a route to isobutylene it claims can produce the MTBE feedstock at half the capital cost of alternative synthesis technology. If proved, the process will be used in a new 7500-10,000 bbl/day MTBE plant at Channelview, TX. Lyondell also hopes to license the technology. {open_quotes}With expanding MTBE capacity, we will have to have new routes to isobutylene,{close_quotes} says Bob G. Gower, president and CEO of Lyondell. {open_quotes}We think this is a good fit within Lyondell, but also that it is important technology.{close_quotes} Gower declines to detail its specifics, but says it is a one-step isomerization of n-butenes to isobutylene. The firm has tested the process at a pilot unit and plans a demonstration unit in 1992.

  5. SWPF Crane Lift Operation

    SciTech Connect (OSTI)

    None

    2010-01-01T23:59:59.000Z

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  6. Pipeline capacity trading could be more efficient if{hor_ellipsis}

    SciTech Connect (OSTI)

    Roth, R.

    1995-12-31T23:59:59.000Z

    This paper discusses the efficiency of pipeline capacity trading. The characteristics of efficient markets, southwest U.S. capacity market, and a solution to excess capacity burden are discussed. It is concluded that capacity trading could be more efficient if the following were to occur: parity of capacity sales was achieved; timely reporting of EBBs of price, volume, and path was mandatory; rate caps on released capacity were removed; and market based rates are established for pipelines.

  7. Top 100 Operators: Proved Reserves and Production, Operated vs...

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2009 1 Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2009 The operator of an oil or...

  8. Sequence Logos, Machine/Channel Capacity, Maxwell's Demon, and Molecular Computers: a Review of the

    E-Print Network [OSTI]

    Schneider, Thomas D.

    Sequence Logos, Machine/Channel Capacity, Maxwell's Demon, and Molecular Computers: a Review. D. Schneider. Sequence logos, machine/channel capacity, Maxwell's demon, and molecular computers

  9. 2012 Smart Grid Peer Review Presentations - Day 1 Morning Session...

    Broader source: Energy.gov (indexed) [DOE]

    Morning Session 2012 Smart Grid Peer Review Presentations - Day 1 Morning Session The Office of Electricity Delivery and Energy Reliability held its bi-annual peer review of the...

  10. DOE and Northwest Partners Host Three-Day Market Introduction...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on the rapidly evolving SSL market. SSL Tutorials Address Technology Basics On Day 1, DOE SSL Portfolio Manager James Brodrick kicked off the workshop with an overview of DOE...

  11. The Power of Choice ? Cold War Patriots Day of Remembrance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Zimbabwe. He faced seven surgeries for cancer and lived to tell his story. At the Cold War Patriots' National Day of Remembrance, held in the Y-12 New Hope Center on Friday,...

  12. Introduce a Girl to Engineering Day | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teacher Programs Classroom Resources Contact education@anl.gov Introduce a Girl to Engineering Day "Let us pick up our books and pencils. They are our most powerful weapon."-...

  13. 12 Days of Energy Savings | Department of Energy

    Office of Environmental Management (EM)

    Keep in the holiday spirit while saving energy by using timer controls to turn holiday lights on and off at specific times. Image: Sarah Gerrity, Energy Department Day 9: Use LED...

  14. Energy Productivity Via Time-of-Day Rates

    E-Print Network [OSTI]

    Michael, R. S.

    1984-01-01T23:59:59.000Z

    Prompted by a combination of PURPA and a national concern about electricity price and supply, many utilities now have in place industrial time-of-day electric rates. When properly designed, these rates present an opportunity for energy...

  15. DOE Headquarters Earth Day 2014 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the Date - April 22, 2014 April 22, 2014, is the 44th anniversary of the founding of Earth Day which marked the beginning of the modern environmental movement. As in years past,...

  16. Inside this issue: Earth and Wellness Day 1

    E-Print Network [OSTI]

    Kidd, William S. F.

    Bulletin Demonstration Schedule 11:00 am President Philip kicks off the day by signing the UN Global Compact for Higher Education 11:20 ­ 11:30 Honest Weight Food Coop ­ Reading and Understanding Food Labels

  17. Genomics-Bioinformatics Day: "Bioinformatics, Computational Biology, Systems Biology & Mathematical

    E-Print Network [OSTI]

    Goldschmidt, Christina

    3rd Genomics-Bioinformatics Day: "Bioinformatics, Computational Biology, Systems Biology on "Bioinformatics, Computational Biology, Systems Biology & Mathematical Biology: Their Relationship". Genomics, Bioinformatics, Computational Biology have a tremendous appeal and these fields have originated or grown

  18. GIS Day @ KU 2013 Symposium Schedule and Opening Remarks

    E-Print Network [OSTI]

    GIS Day @ KU Planning Committee

    2014-04-08T23:59:59.000Z

    Tainted Glasses to Help Subdivide the Ogallala/High Plains Aquifer in Kansas Brownie Wilson – GIS/Support Services Manager, Geohydrology Section, Kansas Geological Survey 4:05-4:30 Awards Presentation and Concluding Remarks GIS Day @ KU is brought... and ONLINE REGISTRATION please visit www.gis.ku.edu Alderson Auditorium, 4th floor Kansas Union 8:30-9:00 Registration and Coffee 9:00-9:15 Opening Remarks Vijay Barve - GIS Day Planning Committee, KU Dept. of Geography 9...

  19. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    SciTech Connect (OSTI)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

    2013-06-21T23:59:59.000Z

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  20. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    SciTech Connect (OSTI)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

    2013-05-01T23:59:59.000Z

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  1. Amalfi/Positano HistoricReflections_10_Day_LIVE_2012.eps

    E-Print Network [OSTI]

    Virginia Tech

    .m. Day 9 At Sea -- -- Day 10 Ephesus (Kusadasi), Turkey 9:00 a.m. 8:00 p.m. Day 11 Santorini, Greece 8

  2. World nuclear capacity and fuel cycle requirements, November 1993

    SciTech Connect (OSTI)

    Not Available

    1993-11-30T23:59:59.000Z

    This analysis report presents the current status and projections of nuclear capacity, generation, and fuel cycle requirements for all countries in the world using nuclear power to generate electricity for commercial use. Long-term projections of US nuclear capacity, generation, fuel cycle requirements, and spent fuel discharges for three different scenarios through 2030 are provided in support of the Department of Energy`s activities pertaining to the Nuclear Waste Policy Act of 1982 (as amended in 1987). The projections of uranium requirements also support the Energy Information Administration`s annual report, Domestic Uranium Mining and Milling Industry: Viability Assessment.

  3. Method of increasing the sulfation capacity of alkaline earth sorbents

    DOE Patents [OSTI]

    Shearer, J.A.; Turner, C.B.; Johnson, I.

    1980-03-13T23:59:59.000Z

    A system and method for increasing the sulfation capacity of alkaline earth carbonates to scrub sulfur dioxide produced during the fluidized bed combustion of coal in which partially sulfated alkaline earth carbonates are hydrated in a fluidized bed to crack the sulfate coating and convert the alkaline earth oxide to the hydroxide. Subsequent dehydration of the sulfate-hydroxide to a sulfate-oxide particle produces particles having larger pore size, increased porosity, decreased grain size and additional sulfation capacity. A continuous process is disclosed.

  4. On the heat capacity of Ce{sub 3}Al

    SciTech Connect (OSTI)

    Singh, Durgesh, E-mail: durgeshkushinagar@gmail.com; Samatham, S. Shanmukharao, E-mail: durgeshkushinagar@gmail.com; Venkateshwarlu, D., E-mail: durgeshkushinagar@gmail.com; Gangrade, Mohan, E-mail: durgeshkushinagar@gmail.com; Ganesan, V., E-mail: durgeshkushinagar@gmail.com [UGC-DAE Consortium for Scientific Research, University Campus, Khandwa Road, Indore-452001, Madhya Pradesh (India)

    2014-04-24T23:59:59.000Z

    Electrical resistivity and heat capacity measurements on Cerium based dense Kondo compound Ce{sub 3}Al have been reported. Clear signatures of first order structural transition at 108K, followed by a Kondo minimum and coherence are clearly seen in resistivity. The structural transition is robust and is not affected by magnetic fields. Heat capacity measurements reveal an anomalous enhancement in the heavy fermion character upon magnetic fields. Vollhardt invariance in specific heat C(T.H) curves have been observed at T=3.7K and at H ? 6T.

  5. TECHNOLOGIES TO ENHANCE OPERATION OF THE EXISTING NATURAL GAS COMPRESSION INFRASTRUCTURE

    SciTech Connect (OSTI)

    Anthony J. Smalley; Ralph E. Harris; Gary D. Bourn

    2003-10-01T23:59:59.000Z

    This report documents work performed in the fourth quarter of the project entitled: ''Technologies to Enhance Operation of the Existing Natural Gas Compression Infrastructure''. The project objective is to develop and substantiate methods for operating integral engine/compressors in gas pipeline service, which reduce fuel consumption, increase capacity, and enhance mechanical integrity. The report describes the following work: second field test; test data analysis for the first field test; operational optimization plans.

  6. Economic Analysis of a Brackish Water Photovoltaic-Operated (BWRO-PV) Desalination System: Preprint

    SciTech Connect (OSTI)

    Al-Karaghouli, A.; Kazmerski, L. L.

    2010-10-01T23:59:59.000Z

    The photovoltaic (PV)-powered reverse-osmosis (RO) desalination system is considered one of the most promising technologies in producing fresh water from both brackish and sea water, especially for small systems located in remote areas. We analyze the economic viability of a small PV-operated RO system with a capacity of 5 m3/day used to desalinate brackish water of 4000 ppm total dissolve solids, which is proposed to be installed in a remote area of the Babylon governorate in the middle of Iraq; this area possesses excellent insolation throughout the year. Our analysis predicts very good economic and environmental benefits of using this system. The lowest cost of fresh water achieved from using this system is US $3.98/ m3, which is very reasonable compared with the water cost reported by small-sized desalination plants installed in rural areas in other parts of the world. Our analysis shows that using this small system will prevent the release annually of 8,170 kg of CO2, 20.2 kg of CO, 2.23 kg of CH, 1.52 kg of particulate matter, 16.41 kg of SO2, and 180 kg of NOx.

  7. Modern-day cleanroom invented by Sandia physicist still used...

    National Nuclear Security Administration (NNSA)

    electronics and pharmaceuticals, made hospital operating rooms safer and helped further space exploration. Read about more about the cleanroom. About the photo: Cleanroom inventor...

  8. Cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  9. Apollo Multiplexer operations manual

    SciTech Connect (OSTI)

    Miller, M.M.

    1985-04-01T23:59:59.000Z

    This report describes the operation of the the Apollo Multiplexer, a microprocessor based communications device designed to process data between an Apollo computer and up to four Gandalf PACXIV data switches. Details are given on overall operation, hardware, and troubleshooting. The reader should gain sufficient knowledge from this report to understand the operation of the multiplexer and effectively analyze and correct any problems that might occur.

  10. HQ- Human Resources Operations

    Broader source: Energy.gov [DOE]

    HQs Human Recources Operations delivers services, including position management, recruitment, staffing and classification, and reduction in force at Headquarters.  Click the "Contacts" Link to find...

  11. Hyponormality of Toeplitz Operators

    E-Print Network [OSTI]

    1910-40-52T23:59:59.000Z

    Amer. Math. Soc. 82(1976), 494-496. [12] S. C. Power. Hankel Operators on Hilbert Space, Pitman, Boston, 1982. [13] D. Sarason. Generalized interpolation in H.

  12. Spectral Operators of Matrices

    E-Print Network [OSTI]

    2014-01-10T23:59:59.000Z

    Jan 10, 2014 ... a thorough study on a new class of matrix valued functions, coined as spectral operators of ..... not self-adjoint. ...... 9 (1981) 1135–1151.

  13. Pipeline Operations Program (Louisiana)

    Broader source: Energy.gov [DOE]

    The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

  14. Superconducting radio-frequency modules test faciilty operating experience

    SciTech Connect (OSTI)

    Soyars, W.; Bossert, R.; Darve, C.; Degraff, B.; Klebaner, A.; Martinez, A.; Pei, L.; Theilacker, J.; /Fermilab

    2007-07-01T23:59:59.000Z

    Fermilab is heavily engaged and making strong technical contributions to the superconducting radio-frequency research and development program (SRF R&D). Four major SRF test areas are being constructed to enable vertical and horizontal cavity testing, as well as cryomodule testing. The existing Fermilab cryogenic infrastructure has been modified to service Fermilab SRF R&D needs. The first stage of the project has been successfully completed, which allows for distribution of cryogens for a single cavity cryomodule using the existing Cryogenic Test Facility (CTF) that houses three Tevatron satellite refrigerators. The cooling capacity available for cryomodule testing at MDB results from the liquefaction capacity of the CTF cryogenic system. The cryogenic system for a single 9-cell cryomodule is currently operational. The paper describes the status, challenges and operational experience of the initial phase of the project.

  15. Accuracy of Link Capacity Estimates using Passive and Active Approaches with CapProbe

    E-Print Network [OSTI]

    Chen, Ling-Jyh

    appropriate streaming rates, while ISPs would be able to determine the capacity of their installed linksAccuracy of Link Capacity Estimates using Passive and Active Approaches with CapProbe Rohit Kapoor to estimate capacity. CapProbe combines both dispersion and end-to-end delay to estimate the capacity

  16. Tacit collusion in a non-repeated price competition game with a soft capacity constraint

    E-Print Network [OSTI]

    cost function. Key words: price competition, tacit collusion, convex cost, Bertrand Para- dox, capacity

  17. 1. Theory for Liquid Heat Capacity I ) Polynomial equation (HC_CPLEQN)

    E-Print Network [OSTI]

    Hong, Deog Ki

    1. Theory for Liquid Heat Capacity I ) Polynomial equation (HC_CPLEQN) Polynomial equation is usedJ/kg-mol.K. II ) Corresponding States Method for Liquid Heat Capacity (HC_CPLCSP) The expression basedGraw-Hill, New York, 2000 2. KDB Routines for Liquid Heat Capacity Calculation KDB liquid heat capacity

  18. High Capacity Li Ion Battery Anodes Using Ge Nanowires

    E-Print Network [OSTI]

    Cui, Yi

    High Capacity Li Ion Battery Anodes Using Ge Nanowires Candace K. Chan, Xiao Feng Zhang, and Yi Cui efficiency > 99%. Structural characterization revealed that the Ge nanowires remain intact and connected nanowire anodes are promising candidates for the development of high-energy-density lithium batteries

  19. Determining the People Capacity of a Structure May 7, 1999

    E-Print Network [OSTI]

    Mitchener, W. Garrett

    sustaining injury? Another important issue is that of comfort: how many people can be #12;t in a room, during, in an overcrowded room, might leave many people injured in the rush to exit whether or not the threat is realTeam 243 Determining the People Capacity of a Structure Team 243 May 7, 1999 1 Introduction

  20. Assessing the Control Systems Capacity for Demand Response in

    E-Print Network [OSTI]

    LBNL-5319E Assessing the Control Systems Capacity for Demand Response in California Industries in this report was coordinated by the Demand Response Research Center and funded by the California Energy of the Demand Response Research Center Industrial Controls Experts Working Group: · Jim Filanc, Southern

  1. Wind Farm Portfolio Optimization under Network Capacity Constraints

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 Wind Farm Portfolio Optimization under Network Capacity Constraints H´el`ene Le Cadre, Anthony of wind farms in a Market Coupling organization, for two Market Designs (exogenous prices and endogenous of efficient wind farm portfolios, is derived theoretically as a function of the number of wind farms

  2. Power Control and Capacity of Spread Spectrum Wireless Networks

    E-Print Network [OSTI]

    Tse, David

    Power Control and Capacity of Spread Spectrum Wireless Networks S.V. Hanly a;1 , and D.N. Tse b;2, there has been signif­ icant research in the area in recent years. While power control has been considered questions about optimal power control as well as the problem of charac­ terizing the resulting network

  3. Effect of Mobility on Power Control and System Capacity

    E-Print Network [OSTI]

    Kumar, Anurag

    Effect of Mobility on Power Control and System Capacity in CDMA Cellular Wireless Networks Munish control, admission control and user mobility. We compare two methods for power control: Constant Re­ ceived Power Control (CRPC) in which the total power received at each base station (BS) is kept constant

  4. Energy-Efficient Dynamic Capacity Provisioning in Server Farms

    E-Print Network [OSTI]

    Harchol-Balter, Mor

    Energy-Efficient Dynamic Capacity Provisioning in Server Farms Anshul Gandhi Varun Gupta Mor, either expressed or implied, of NSF. #12;Keywords: Server farms, Power management, Queueing theory #12;Abstract A central question in designing server farms today is how to efficiently provision the number

  5. High capacity nickel battery material doped with alkali metal cations

    DOE Patents [OSTI]

    Jackovitz, John F. (Monroeville, PA); Pantier, Earl A. (Penn Hills, PA)

    1982-05-18T23:59:59.000Z

    A high capacity battery material is made, consisting essentially of hydrated Ni(II) hydroxide, and about 5 wt. % to about 40 wt. % of Ni(IV) hydrated oxide interlayer doped with alkali metal cations selected from potassium, sodium and lithium cations.

  6. Capacities and Research in Homeland Security The University at Buffalo

    E-Print Network [OSTI]

    Krovi, Venkat

    , and Biophotonics (ILPB) and the Center for Spin Effects and Quantum Information in Nanostructures (CSEQuIN) conduct multidisciplinary science and technology programs focusing on the development of: (1) high capacity data storage devices for "smart sensor" systems to detect biological and chemical agents. These research directions

  7. The Capacity Loss of Dense Constellations Tobias Koch

    E-Print Network [OSTI]

    high SNR, our results recover the power loss of 1.53dB for square signal constellations without-noise channels for suitably high signal- to-noise ratio. Our expression for the capacity loss recovers the power loss of 1.53dB for square signal constellations. I. INTRODUCTION As it is well known, the channel

  8. TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING CAPACITY IN

    E-Print Network [OSTI]

    California at Berkeley. University of

    PWP-085 TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING CAPACITY IN CALIFORNIA, California 94720-5180 www.ucei.org #12;TRENDS IN ELECTRICITY CONSUMPTION, PEAK DEMAND, AND GENERATING** Abstract This study analyzes state and regional electricity supply and demand trends for the eleven states

  9. Dynamic Energy-Aware Capacity Provisioning for Cloud Computing Environments

    E-Print Network [OSTI]

    Boutaba, Raouf

    reduction in energy cost, while maintaining an acceptable average scheduling delay for individual tasksDynamic Energy-Aware Capacity Provisioning for Cloud Computing Environments Qi Zhang University by amortizing initial capital investment over large number of machines, they also incur tremendous energy cost

  10. A CAUTIONARY NOTE REGARDING THE DATA INTEGRITY CAPACITY

    E-Print Network [OSTI]

    Irvine, Cynthia E.

    assurance components, as well as the integrity of data read from high assurance repositories and displayedA CAUTIONARY NOTE REGARDING THE DATA INTEGRITY CAPACITY OF CERTAIN SECURE SYSTEMS Cynthia E. Irvine of architecture. We discuss the general integrity property that systems can only be trusted to manage modi able

  11. Capacity-aware back-pressure traffic signal control

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    load, one must wonder whether the network is used at its maximum capacity. Vehicle automation is expected to enable much more precise and intelligent coordination between vehicles, possibly reducing congestion [1]. However, automated cars are not currently ready for large commercial deployment. Human

  12. On the Throughput Capacity of Heterogeneous Wireless Networks

    E-Print Network [OSTI]

    Latchman, Haniph A.

    On the Throughput Capacity of Heterogeneous Wireless Networks Pan Li, Member, IEEE, and Yuguang of wireless networks. However, it is commonly assumed that all nodes in the network are identical. The issue of heterogeneous wireless networks with general network settings. Specifically, we consider an extended network

  13. Solar Photovoltaic Capacity F t P f d P li

    E-Print Network [OSTI]

    6/19/2013 1 Solar Photovoltaic ­ Capacity F t P f d P li Generating Resources Advisory Committee Advisor Model (SAM), version 2013.1.15 Technology: Solar PV (PVWatts system model)Technology: Solar PV (MWh) (First year output, each year thereafter degrades 0.5%) 6 #12;6/19/2013 4 Shape of PNW Solar PV

  14. Lecture Ch. 2a Energy and heat capacity

    E-Print Network [OSTI]

    Russell, Lynn

    machine! Conservation of energy! Definition of energy! Uniqueness of work values! Q = 0,W = 0 ! "E = 0 ! E1 Lecture Ch. 2a · Energy and heat capacity ­ State functions or exact differentials ­ Internal energy vs. enthalpy · 1st Law of thermodynamics ­ Relate heat, work, energy · Heat/work cycles (and path

  15. Lecture Ch. 2a Energy and heat capacity

    E-Print Network [OSTI]

    Russell, Lynn

    of energy Definition of energy Uniqueness of work values Q = 0,W = 0 E = 0 E2 = E1 Q = 0 E = W Wrev1 Lecture Ch. 2a · Energy and heat capacity ­ State functions or exact differentials ­ Internal energy vs. enthalpy · 1st Law of thermodynamics ­ Relate heat, work, energy · Heat/work cycles (and path

  16. Linear Codes, Target Function Classes, and Network Computing Capacity

    E-Print Network [OSTI]

    Franceschetti, Massimo

    Linear Codes, Target Function Classes, and Network Computing Capacity Rathinakumar Appuswamy Submitted: May 6, 2011 Abstract We study the use of linear codes for network computing in single in network coding are applicable to network computing as well. Network computing problems arise in various

  17. COMMUNITY CAPACITY BUILDING FOR REVITALIZATION AND SUSTAINABLE REDEVELOPMENT

    SciTech Connect (OSTI)

    Downing, Melinda; Rosenthall, John; Hudson, Michelle

    2003-02-27T23:59:59.000Z

    Capacity building programs help poor and disadvantaged communities to improve their ability to participate in the environmental decision-making processes. They encourage citizen involvement, and provide the tools that enable them to do so. Capacity building enables communities that would otherwise be excluded to participate in the process, leading to better, and more just decisions. The Department of Energy (DOE) continues to be committed to promoting environmental justice and involving its stakeholders more directly in the planning and decision-making process for environmental cleanup. DOE's Environmental Management Program (EM) is in full support of this commitment. Through its environmental justice project, EM provides communities with the capacity to effectively contribute to a complex technical decision-making process by furnishing access to computers, the Internet, training and technical assistance. DOE's Dr. Samuel P. Massie Chairs of Excellence Program (Massie Chairs) function as technical advisors to many of these community projects. The Massie Chairs consist of nationally and internationally recognized engineers and scientists from nine Historically Black Colleges and Universities (HBCUs) and one Hispanic Serving Institution (HIS). This paper will discuss capacity building initiatives in various jurisdictions.

  18. How Mobility Increases Mobile Cloud Computing Processing Capacity

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    How Mobility Increases Mobile Cloud Computing Processing Capacity Anh-Dung Nguyen, Patrick S--In this paper, we address a important and still unanswered question in mobile cloud computing "how mobility the resilience of mobile cloud computing services. Keywords--Mobile cloud computing, mobility, quality of service

  19. Capacity planning in a transitional economy: What issues? Which models?

    SciTech Connect (OSTI)

    Mubayi, V.; Leigh, R.W. [Brookhaven National Lab., Upton, NY (United States); Bright, R.N. [Anylec Research, Inc., Bayport, NY (United States)

    1996-03-01T23:59:59.000Z

    This paper is devoted to an exploration of the important issues facing the Russian power generation system and its evolution in the foreseeable future and the kinds of modeling approaches that capture those issues. These issues include, for example, (1) trade-offs between investments in upgrading and refurbishment of existing thermal (fossil-fired) capacity and safety enhancements in existing nuclear capacity versus investment in new capacity, (2) trade-offs between investment in completing unfinished (under construction) projects based on their original design versus investment in new capacity with improved design, (3) incorporation of demand-side management options (investments in enhancing end-use efficiency, for example) within the planning framework, (4) consideration of the spatial dimensions of system planning including investments in upgrading electric transmission networks or fuel shipment networks and incorporating hydroelectric generation, (5) incorporation of environmental constraints and (6) assessment of uncertainty and evaluation of downside risk. Models for exploring these issues include low power shutdown (LPS) which are computationally very efficient, though approximate, and can be used to perform extensive sensitivity analyses to more complex models which can provide more detailed answers but are computationally cumbersome and can only deal with limited issues. The paper discusses which models can usefully treat a wide range of issues within the priorities facing decision makers in the Russian power sector and integrate the results with investment decisions in the wider economy.

  20. Optimal Demand Response Capacity of Automatic Lighting Control

    E-Print Network [OSTI]

    Mohsenian-Rad, Hamed

    . To remedy this problem, different demand side management programs have been proposed to shape the energy prior studies have extensively studied the capacity of offering demand response in buildings and office buildings. Keywords: Demand response, automatic lighting control, commercial and office buildings

  1. DHC: a diurnal heat capacity program for microcomputers

    SciTech Connect (OSTI)

    Balcomb, J.D.

    1985-01-01T23:59:59.000Z

    A computer program has been developed that can predict the temperature swing in direct gain passive solar buildings. The diurnal heat capacity (DHC) program calculates the DHC for any combination of homogeneous or layered surfaces using closed-form harmonic solutions to the heat diffusion equation. The theory is described, a Basic program listing is provided, and an example solution printout is given.

  2. Fail-Safe Design for Large Capacity Lithium-Ion Battery Systems

    SciTech Connect (OSTI)

    Kim, G. H.; Smith, K.; Ireland, J.; Pesaran, A.

    2012-07-15T23:59:59.000Z

    A fault leading to a thermal runaway in a lithium-ion battery is believed to grow over time from a latent defect. Significant efforts have been made to detect lithium-ion battery safety faults to proactively facilitate actions minimizing subsequent losses. Scaling up a battery greatly changes the thermal and electrical signals of a system developing a defect and its consequent behaviors during fault evolution. In a large-capacity system such as a battery for an electric vehicle, detecting a fault signal and confining the fault locally in the system are extremely challenging. This paper introduces a fail-safe design methodology for large-capacity lithium-ion battery systems. Analysis using an internal short circuit response model for multi-cell packs is presented that demonstrates the viability of the proposed concept for various design parameters and operating conditions. Locating a faulty cell in a multiple-cell module and determining the status of the fault's evolution can be achieved using signals easily measured from the electric terminals of the module. A methodology is introduced for electrical isolation of a faulty cell from the healthy cells in a system to prevent further electrical energy feed into the fault. Experimental demonstration is presented supporting the model results.

  3. Ordered involutive operator spaces

    E-Print Network [OSTI]

    Blecher, David P; Neal, Matthew; Werner, Wend

    2007-01-01T23:59:59.000Z

    This is a companion to recent papers of the authors; here we construct the `noncommutative Shilov boundary' of a (possibly nonunital) selfadjoint ordered space of Hilbert space operators. The morphisms in the universal property of the boundary preserve order. As an application, we consider `maximal' and `minimal' unitizations of such ordered operator spaces.

  4. Operations Research + Information Engineering

    E-Print Network [OSTI]

    Keinan, Alon

    and the equipment they operate to perform most efficiently. The allocation of resources may be represented of the techniques and modeling concepts needed to analyze and design complex systems. As an operations researcher. All business systems are complex and need sophisticated decision-making methods that enable employees

  5. Humanitarian Operations Pinar Keskinocak

    E-Print Network [OSTI]

    Li, Mo

    1 Humanitarian Operations Pinar Keskinocak H. Milton Stewart School of Industrial & Systems for Allocating Urban Emergency Units: A Survey Larson (1972), Urban Police Patrol Analysis Larson and Odoni (1981), Urban Operations Research Jones and Eden (1981), O.R. in the Community Pollock, Rothkopf, Barnett (1994

  6. Cogeneration System Size Optimization Constant Capacity and Constant Demand Models

    E-Print Network [OSTI]

    Wong-Kcomt, J. B.; Turner, W. C.

    proposed to select a combined heat and power (CHP) or cogeneration system and to evaluate its optimal size. Here, "optimal" size means the nominal system size (in kW ) that minimizes the total e equivalent annual cost (TEAC) to own, operate... ratio (HPR l ). Thus, Canton et.al (2) have developed a graphical method to visualize different operating scenarios. Hay (3) and the AGA Manual (I) consider the following operation modes for a plant with variable CHP loads. Each operation mode...

  7. Take Our Daughters and Sons to Work Day

    Broader source: Energy.gov [DOE]

    2014 is the 21st anniversary of the annual opportunity to immerse your children and relatives in the daily work of the Energy Department. On Thursday, April 24, bring your daughters and sons to the office with you for a day of shadowing your work, showing off your office, testing out the cafeteria, and meeting your coworkers. Check with your office for structured activities.

  8. Office of Evaluation and Testing Test Day Tips

    E-Print Network [OSTI]

    Brinkmann, Peter

    Office of Evaluation and Testing Test Day Tips Get plenty of rest the night before the test. The best thing to do the evening before the test is to get a good night's sleep. You've covered the content and you've perfected the skills. Now it's time to get in test mode -- calm, rested, confident, and ready

  9. Engineering and Computing Open Day Programme 2012 Activity Time Location

    E-Print Network [OSTI]

    Berzins, M.

    Engineering and Computing Open Day Programme 2012 Activity Time Location Building Number What is Engineering? (Talk) 0900 - 0945 Electronic and Electrical Engineering, Rhodes Lecture Theatre 51 1000 - 1045 EC Stoner Building, School of Computing, Reception (Level 7) 73 Electronic Engineering (Talk) 1000

  10. ISSN 1745-9648 Storing Wind for a Rainy Day

    E-Print Network [OSTI]

    Feigon, Brooke

    generators, with no correlation with wind generation. We estimate the cost of volatility in Denmark's wind generation. We estimate the cost of volatility in Denmark's wind output to equal between 4% and 8% of itsISSN 1745-9648 Storing Wind for a Rainy Day What kind of electricity does Denmark export? Richard

  11. 2008 TEAM BUILDING DAY For the teams of the

    E-Print Network [OSTI]

    2008 TEAM BUILDING DAY For the teams of the DST/NRF CENTRE OF EXCELLENCE IN TREE HEALTH and Ryan Nadel On Friday 11 January 2008, the TPCP/CTHB team participated in a Team Building session at the ABSA Conference Centre in Pretoria North. Eighty-five members of the team, comprising research

  12. TITLE: Wireless Multimedia Architectures and Applications DURATION: Half day

    E-Print Network [OSTI]

    Furht, Borko

    SEMINAR TITLE: Wireless Multimedia Architectures and Applications DURATION: Half day INSTRUCTOR: Dr: http://www.cse.fau.edu/~borko DESCRIPTION: The multimedia and Internet technologies including World that will provide data transmission speeds of several Mbps, which are needed for multimedia. We will present

  13. and Co-Host Riverside Electric Vehicle Day

    E-Print Network [OSTI]

    Mills, Allen P.

    and Co-Host Riverside Electric Vehicle Day Where: UC Riverside | CE-CERT, 1084 Columbia Ave, 92507 renewable sourc- es, efficiently use electric transporta- tion through advanced vehicles and im- prove our million electric vehi- cles on California's roads by 2023 and to ensure that low-income communities, which

  14. Spain and the Bologna Plan: A Modern Day

    E-Print Network [OSTI]

    New Hampshire, University of

    Spain and the Bologna Plan: A Modern Day Controversy By: Danielle Vasan Communication of Privatization #12;Higher Education in Spain before Bologna 1983: Three-cycled degree system Diplomado (3-5 years) Licenciado (1-2 years) Doctor (3 years & Thesis) #12;Higher Education in Spain Today Graduado

  15. The Preuss School UCSD Daily Bulletin A Day

    E-Print Network [OSTI]

    Russell, Lynn

    is National Poetry Month! Today is the last day, but here's a poem to help you find the poet in yourself. Keep reading, dreaming, and writing poetry! (4/30 ­Ms. Gabay) A New Poet by Linda Pastan Finding a new poet

  16. The College of Optics & Photonics Industrial Affiliates Day

    E-Print Network [OSTI]

    Van Stryland, Eric

    CREOL The College of Optics & Photonics Industrial Affiliates Day 2011 Symposium on FAR IR & THZ Photonics CREOLThe College of Optics and Photonics #12;CREOL The College of Optics & Photonics Studentofthe characterization Dimitrios Mandridis Graduate Student CREOL,TheCollegeofOptics Photonics 2:05Walktothe

  17. The College of Optics & Photonics 1 Industrial Affiliates Day

    E-Print Network [OSTI]

    Van Stryland, Eric

    3/7/14 1 CREOL The College of Optics & Photonics 1 Industrial Affiliates Day 2014 Symposium Advances in Optics & Photonics CREOLThe College of Optics and Photonics CREOL The College of Optics & Photonics 2 MJ Soileau V.P. for Research & Commercialization Professor of Optics, ECE & Physics Founder

  18. 45-Day Language Hearing Agenda Building Energy Efficiency Standards

    E-Print Network [OSTI]

    Shirakh 09:15 AM Revisions to Sections 10-101 ­ 10-114 ­ Energy Building Regulations, All Occupancies Gary45-Day Language Hearing Agenda Building Energy Efficiency Standards Revisions for Residential for Solar Ready Buildings ­ All Occupancies Patrick Saxton 10:35 AM Revisions to Sections 150

  19. Water is Theme For UNL at September's Husker Harvest Days

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    Water is Theme For UNL at September's Husker Harvest Days "Nebraska is fortunate to have a vibrant water-related research and programming community. This year's colloquium features the best of the best Water Center and Water Resources Research Initiative. In addition to presentations, the colloquium

  20. Consulting Day Report 2008 Center for Nonprofit Strategy and Management

    E-Print Network [OSTI]

    Rosen, Jay

    Consulting Day Report 2008 Center for Nonprofit Strategy and Management School of Public affairs Baruch College City University of New York 2008 #12;Center for Nonprofit Strategy and Management Baruch follow. #12;Center for Nonprofit Strategy and Management Baruch College School of Public Affairs 3

  1. OSU Agricultural Composting Workshop Day 1 Title Description

    E-Print Network [OSTI]

    Tullos, Desiree

    OSU Agricultural Composting Workshop Day 1 Title Description 8:30 Registration 9:00 Welcome; provide handouts; form work groups 9:30 The composting process Stages of composting; composting methods; composting parameters (temperature, moisture, C/N ratio, pH, micro-organisms, etc.); what should I compost

  2. Invitation/Program Technology Watch Day on Future Biofuels

    E-Print Network [OSTI]

    Invitation/Program Technology Watch Day on Future Biofuels and 4. TMFB International Workshop;International Research Centers Focussing on Future Biofuels are Presenting Their Research Approaches and Current Concerning Future Biofuels DBFZ ­ Deutsches Biomasseforschungszentrum M. Seiffert, F. Mueller-Langer German

  3. Carbon Dioxide Sealing Capacity: Textural or Compositional Controls?

    SciTech Connect (OSTI)

    Cranganu, Constantin; Soleymani, Hamidreza; Sadiqua, Soleymani; Watson, Kieva

    2013-11-30T23:59:59.000Z

    This research project is aiming to assess the carbon dioxide sealing capacity of most common seal-rocks, such as shales and non-fractured limestones, by analyzing the role of textural and compositional parameters of those rocks. We hypothesize that sealing capacity is controlled by textural and/or compositional pa-rameters of caprocks. In this research, we seek to evaluate the importance of textural and compositional parameters affecting the sealing capacity of caprocks. The conceptu-al framework involves two testable end-member hypotheses concerning the sealing ca-pacity of carbon dioxide reservoir caprocks. Better understanding of the elements controlling sealing quality will advance our knowledge regarding the sealing capacity of shales and carbonates. Due to relatively low permeability, shale and non-fractured carbonate units are considered relatively imper-meable formations which can retard reservoir fluid flow by forming high capillary pres-sure. Similarly, these unites can constitute reliable seals for carbon dioxide capture and sequestration purposes. This project is a part of the comprehensive project with the final aim of studying the caprock sealing properties and the relationship between microscopic and macroscopic characteristics of seal rocks in depleted gas fields of Oklahoma Pan-handle. Through this study we examined various seal rock characteristics to infer about their respective effects on sealing capacity in special case of replacing reservoir fluid with super critical carbon dioxide (scCO{sub 2}). To assess the effect of textural and compositional properties on scCO{sub 2} maximum reten-tion column height we collected 30 representative core samples in caprock formations in three counties (Cimarron, Texas, Beaver) in Oklahoma Panhandle. Core samples were collected from various seal formations (e.g., Cherokee, Keys, Morrowan) at different depths. We studied the compositional and textural properties of the core samples using several techniques. Mercury Injection Porosimetry (MIP), Scanning Electron Microsco-py SEM, and Sedigraph measurements are used to assess the pore-throat-size distribu-tion, sorting, texture, and grain size of the samples. Also, displacement pressure at 10% mercury saturation (Pd) and graphically derived threshold pressure (Pc) were deter-mined by MIP technique. SEM images were used for qualitative study of the minerals and pores texture of the core samples. Moreover, EDS (Energy Dispersive X-Ray Spec-trometer), BET specific surface area, and Total Organic Carbon (TOC) measurements were performed to study various parameters and their possible effects on sealing capaci-ty of the samples. We found that shales have the relatively higher average sealing threshold pressure (Pc) than carbonate and sandstone samples. Based on these observations, shale formations could be considered as a promising caprock in terms of retarding scCO{sub 2} flow and leak-age into above formations. We hypothesized that certain characteristics of shales (e.g., 3 fine pore size, pore size distribution, high specific surface area, and strong physical chemical interaction between wetting phase and mineral surface) make them an effi-cient caprock for sealing super critical CO{sub 2}. We found that the displacement pressure at 10% mercury saturation could not be the ultimate representative of the sealing capacity of the rock sample. On the other hand, we believe that graphical method, introduced by Cranganu (2004) is a better indicator of the true sealing capacity. Based on statistical analysis of our samples from Oklahoma Panhandle we assessed the effects of each group of properties (textural and compositional) on maximum supercriti-cal CO{sub 2} height that can be hold by the caprock. We conclude that there is a relatively strong positive relationship (+.40 to +.69) between supercritical CO{sub 2} column height based on Pc and hard/ soft mineral content index (ratio of minerals with Mohs hardness more than 5 over minerals with Mohs hardness less than 5) in both shales and limestone samples. Average median pore rad

  4. Assessment of the methane oxidation capacity of compacted soils intended for use as landfill cover materials

    SciTech Connect (OSTI)

    Rachor, Ingke, E-mail: i.rachor@ifb.uni-hamburg.de [University of Hamburg, Institute of Soil Science, Allende-Platz 2, 20146 Hamburg (Germany); Gebert, Julia; Groengroeft, Alexander; Pfeiffer, Eva-Maria [University of Hamburg, Institute of Soil Science, Allende-Platz 2, 20146 Hamburg (Germany)

    2011-05-15T23:59:59.000Z

    The microbial oxidation of methane in engineered cover soils is considered a potent option for the mitigation of emissions from old landfills or sites containing wastes of low methane generation rates. A laboratory column study was conducted in order to derive design criteria that enable construction of an effective methane oxidising cover from the range of soils that are available to the landfill operator. Therefore, the methane oxidation capacity of different soils was assessed under simulated landfill conditions. Five sandy potential landfill top cover materials with varying contents of silt and clay were investigated with respect to methane oxidation and corresponding soil gas composition over a period of four months. The soils were compacted to 95% of their specific proctor density, resulting in bulk densities of 1.4-1.7 g cm{sup -3}, reflecting considerably unfavourable conditions for methane oxidation due to reduced air-filled porosity. The soil water content was adjusted to field capacity, resulting in water contents ranging from 16.2 to 48.5 vol.%. The investigated inlet fluxes ranged from 25 to about 100 g CH{sub 4} m{sup -2} d{sup -1}, covering the methane load proposed to allow for complete oxidation in landfill covers under Western European climate conditions and hence being suggested as a criterion for release from aftercare. The vertical distribution of gas concentrations, methane flux balances as well as stable carbon isotope studies allowed for clear process identifications. Higher inlet fluxes led to a reduction of the aerated zone, an increase in the absolute methane oxidation rate and a decline of the relative proportion of oxidized methane. For each material, a specific maximum oxidation rate was determined, which varied between 20 and 95 g CH{sub 4} m{sup -2} d{sup -1} and which was positively correlated to the air-filled porosity of the soil. Methane oxidation efficiencies and gas profile data imply a strong link between oxidation capacity and diffusive ingress of atmospheric air. For one material with elevated levels of fine particles and high organic matter content, methane production impeded the quantification of methane oxidation potentials. Regarding the design of landfill cover layers it was concluded that the magnitude of the expected methane load, the texture and expected compaction of the cover material are key variables that need to be known. Based on these, a column study can serve as an appropriate testing system to determine the methane oxidation capacity of a soil intended as landfill cover material.

  5. Quantum Operation Time Reversal

    SciTech Connect (OSTI)

    Crooks, Gavin E.

    2008-03-25T23:59:59.000Z

    The dynamics of an open quantum system can be described by a quantum operation: A linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes toward equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

  6. Operation Prognostics and Operation Diagnostics—Technologies for Enhanced Operations and Controls

    E-Print Network [OSTI]

    Baumann, O.

    PROGNOSTICS AND OPERATION DIAGNOSTICS ? NEW TECHNOLOGIES FOR ENHANCED OPERATIONS AND CONTROLS OLIVER BAUMANN, PRESIDENT 202-608-1334 EBERT & BAUMANN CONSULTING ENGINEERS, WASHINGTON D.C. The Methodologies of Operation Prognostics and Operation...

  7. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29T23:59:59.000Z

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  8. Operation Research Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as an Operation Research Analyst in the Market Analysis and Pricing organization of Power Services. This organization is responsible for performing market...

  9. Operations Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-30T23:59:59.000Z

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  10. Nuclear material operations manual

    SciTech Connect (OSTI)

    Tyler, R.P.

    1981-02-01T23:59:59.000Z

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  11. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14T23:59:59.000Z

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  12. Continuity of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14T23:59:59.000Z

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  13. Operations | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Argonne mentors students for the next generation of scientistsMay 28, 2015 On May 6, the accomplishments of seventeen Chicago-area high school students that had been...

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0Richland, Washington 99352 10O-AMSE-0054 A PR I Mr. J. G. Lehew III, President and Chief Executive Officer...

  15. SNS Target Systems Operational

    E-Print Network [OSTI]

    McDonald, Kirk

    a failed gas seal on the shaft and leaking oil seals but has operated well since then · The moderator 7.5 k First target replacement · No observed corrosion · Internal Boroscope examination in progress · ~ 50 mm

  16. John Day Watershed Restoration Projects, annual report 2003.

    SciTech Connect (OSTI)

    Brown, Linda (Confederated Tribes of the Warm Springs Reservation of Oregon, John Day Basin Office, John Day, OR)

    2004-01-01T23:59:59.000Z

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

  17. MISO Capacity with Per-Antenna Power Constraint

    E-Print Network [OSTI]

    Vu, Mai

    2010-01-01T23:59:59.000Z

    We establish in closed-form the capacity and the optimal signaling scheme for a MISO channel with per-antenna power constraint. Two cases of channel state information are considered: constant channel known at both the transmitter and receiver, and Rayleigh fading channel known only at the receiver. For the first case, the optimal signaling scheme is beamforming with the phases of the beam weights matched to the phases of the channel coefficients, but the amplitudes independent of the channel coefficients and dependent only on the constrained powers. For the second case, the optimal scheme is to send independent signals from the antennas with the constrained powers. In both cases, the capacity with per-antenna power constraint is usually less than that with sum power constraint.

  18. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  19. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  20. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.