Powered by Deep Web Technologies
Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Technology Brief: Analysis of Current-Day Commercial Electrolyzers  

SciTech Connect (OSTI)

This factsheet provides an overview of the current state of electrolytic hydrogen production technologies and an economic analysis of the processes and systems available as of December 2003. The operating specifications and hydrogen production costs of commercially available electrolyzers from five manufacturers, i.e., Stuart, Teledyne, Proton, Norsk Hydro, and Avalence, are compared.

Not Available

2004-09-01T23:59:59.000Z

2

Estimating electric current densities in solar active regions  

E-Print Network [OSTI]

Electric currents in solar active regions are thought to provide the energy released via magnetic reconnection in solar flares. Vertical electric current densities $J_z$ at the photosphere may be estimated from vector magnetogram data, subject to substantial uncertainties. The values provide boundary conditions for nonlinear force- free modelling of active region magnetic fields. A method is presented for estimating values of $J_z$ taking into account uncertainties in vector magnetogram field values, and minimizing $J_z^2$ across the active region. The method is demonstrated using the boundary values of the field for a force-free twisted bipole, with the addition of noise at randomly chosen locations.

Wheatland, M S

2015-01-01T23:59:59.000Z

3

Acoustic Doppler Current Profiler Measurements in the Tailrace at John Day Dam  

SciTech Connect (OSTI)

Acoustic Doppler current profilers (ADCPs) were used to measure water velocities in the tailrace at John Day Dam over a two-week period in February 2005. Data were collected by the Pacific Northwest National Laboratory for the Hydraulic Design Section, Portland District, U.S. Army Corps of Engineers (USACE). The objective of this project was therefore to collect field measurements of water velocities in the near-field draft tube exit zone as well as the far-field tailrace to be used for improving these models. Field data were collected during the project using five separate ADCPs. Mobile ADCP data were collected using two ADCPs mounted on two separate boats. Data were collected by either holding the boat on-station at pre-defined locations for approximately 10 minutes or in moving transect mode when the boat would move over large distances during the data collection. Results from the mobile ADCP survey indicated a complex hydrodynamic flow field in the tailrace downstream of John Day Dam. A large gyre was noted between the skeleton section of the powerhouse and non-spilling portion of the spillway. Downstream of the spillway, the spillway flow is constrained against the navigation lock guide wall, and large velocities were noted in this region. Downstream of the guide wall, velocities decreased as the spillway jet dispersed. Near the tailrace island, the flow split was measured to be approximately equal on Day 2 (25.4 kcfs spillway/123 kcfs total). However, approximately 60% of the flow passed along the south shore of the island on Day 1 (15.0 kcfs spillway/150 kcfs total). At a distance of 9000 ft downstream of the dam, flows had equalized laterally and were generally uniform over the cross section. The collection of water velocities near the draft tube exit of an operating turbine unit is not routine, and equipment capable of measuring 3D water velocities in these zones are at the forefront of hydraulic measurement technology. Although the feasibility of measuring 1D water velocity magnitudes has been previously demonstrated by the authors, the feasibility of resolving 3D water velocity vectors given the heterogeneity of the flow field was unknown before this studyís data were collected. Both the 1D and 3D data were collected by deploying three ADCPs on dual-axis rotators directly above the draft tube exit of Turbine Unit 16. These instruments collected 1D data during both the mobile reconnaissance campaign and a later one-week period with zero spillway discharge. During the zero spillway discharge period, Turbine Unit 16 was operated over a range of discharges. Approximately 12 hours of 1D velocity data were collected at low (12 kcfs), middle (16.2 kcfs), and high (19.2 kcfs) turbine discharges. The 1D dataset indicates large differences in flow patterns and RMS velocity fluctuations among the various discharge levels. Results from this project show that it is technically feasible to measure 3D water velocities directly downstream of an operating turbine unit using a narrow beam swath (i.e., 6-degree) ADCP. Data products from these 3D velocity data include a measurement of the draft tube barrel flow distribution (a.k.a., the flow split), directional changes and the general decay of velocity as flow exits the draft tube and enters the tailrace, and a relative measure of the homogeneity of the flow field.

Cook, Chris B.; Dibrani, Berhon; Serkowski, John A.; Richmond, Marshall C.; Titzler, P. Scott; Dennis, Gary W.

2006-01-30T23:59:59.000Z

4

Modeling and Estimating Current Harmonics of Variable Electronic Loads  

E-Print Network [OSTI]

This paper develops a model for relating input current harmonic content to real power consumption for variable electronic loads, specifically for loads' actively controlled inverters energized by an uncontrolled rectification ...

Wichakool, Warit

5

Available Alarms in CDE for Next-Day Generation Estimates - March...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

submit Generation Estimates through the Customer Data Entry (CDE) in web Trans or the WECC Electronic Industrial Data Exchange (EIDE) as described in BPAT's Business Practices....

6

Estimating Heat and Mass Transfer Processes in Green Roof Systems: Current Modeling Capabilities and Limitations (Presentation)  

SciTech Connect (OSTI)

This presentation discusses estimating heat and mass transfer processes in green roof systems: current modeling capabilities and limitations. Green roofs are 'specialized roofing systems that support vegetation growth on rooftops.'

Tabares Velasco, P. C.

2011-04-01T23:59:59.000Z

7

Estimate of Extreme Wind, Wave, Surge, and Current Conditions Wilmington Canyon Integrated Design Project  

E-Print Network [OSTI]

1 Estimate of Extreme Wind, Wave, Surge, and Current Conditions for the Wilmington Canyon. In order to estimate loads during extreme wind and wave events, these events must be defined. The design. This paper does not treat wave spectral analysis, extreme wind shear, veer, clocking, turbulence intensity

Firestone, Jeremy

8

GEOPHYSICAL RESEARCH LETTERS, VOL. 0, NO. 0, PAGES 0-0, M 0, 2001 A new estimate for present-day Cocos-Caribbean  

E-Print Network [OSTI]

-day Cocos-Caribbean plate motion: Implications for slip along the Central American volcanic arc Charles De continuously-operating GPS sites on the Caribbean, North American, and Pacific plates are combined with 61 a new estimate of present-day Cocos-Caribbean plate motion. A comparison of the predicted Cocos-Caribbean

DeMets, Chuck

9

POSITION ESTIMATOR AND SIMPLIFIED CURRENT CONTROL STRATEGY FOR BRUSHLESS-DC MOTORS, USING DSP TECHNOLOGY  

E-Print Network [OSTI]

motor (PMSM), with sinusoidal back emf. This machine has been tested with quasi-square current waveforms

Catholic University of Chile (Universidad Católica de Chile)

10

White Day  

E-Print Network [OSTI]

but also to their male co-workers. Men have White Day a month later on March 14th. Created by a sweets manufacturer in 1980 to boost sales, White Day is more of a marketing ploy than a holiday. On White Day, you will see men scurrying about purchasing giri...

Hacker, Randi

2010-05-05T23:59:59.000Z

11

PLA Day  

E-Print Network [OSTI]

Broadcast Transcript: August 1st is coming up, people, and you know what that means. People's Liberation Army Day here in China:, time to party for the Party and celebrate the army's formation back in 1927. This year, ...

Hacker, Randi

2010-08-04T23:59:59.000Z

12

Bicyclists converge on Schenley Plaza on National Bike to Work Day, May 16. Kevin Sheehy of Parking, Transportation and Services estimated 60-70 bicycle commuters visited Schenley  

E-Print Network [OSTI]

, Transportation and Services estimated 60-70 bicycle commuters visited Schenley Plaza between 7-10 a.m. During that time, Pitt police registered 36 bicycles, Pitt's bicycle police inspected 36 bicycles and Oakland

Jiang, Huiqiang

13

Pi Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenter |Photoinduced2Zoeand Physics ORNLPi Day

14

Glass Property Models and Constraints for Estimating the Glass to be Produced at Hanford by Implementing Current Advanced Glass Formulation Efforts  

SciTech Connect (OSTI)

Recent glass formulation and melter testing data have suggested that significant increases in waste loading in HLW and LAW glasses are possible over current system planning estimates. The data (although limited in some cases) were evaluated to determine a set of constraints and models that could be used to estimate the maximum loading of specific waste compositions in glass. It is recommended that these models and constraints be used to estimate the likely HLW and LAW glass volumes that would result if the current glass formulation studies are successfully completed. It is recognized that some of the models are preliminary in nature and will change in the coming years. Plus the models do not currently address the prediction uncertainties that would be needed before they could be used in plant operations. The models and constraints are only meant to give an indication of rough glass volumes and are not intended to be used in plant operation or waste form qualification activities. A current research program is in place to develop the data, models, and uncertainty descriptions for that purpose. A fundamental tenet underlying the research reported in this document is to try to be less conservative than previous studies when developing constraints for estimating the glass to be produced by implementing current advanced glass formulation efforts. The less conservative approach documented herein should allow for the estimate of glass masses that may be realized if the current efforts in advanced glass formulations are completed over the coming years and are as successful as early indications suggest they may be. Because of this approach there is an unquantifiable uncertainty in the ultimate glass volume projections due to model prediction uncertainties that has to be considered along with other system uncertainties such as waste compositions and amounts to be immobilized, split factors between LAW and HLW, etc.

Vienna, John D.; Kim, Dong-Sang; Skorski, Daniel C.; Matyas, Josef

2013-07-31T23:59:59.000Z

15

Electric Currents Electric Current  

E-Print Network [OSTI]

;Problem 3: At $0.095/kWh, what does it cost to leave a 25W porch light on day and night for a year = 219000 Watt- hour = 219kWh. So, total cost = 219 x$0.095 = $20.8 #12;Problem 4: A 100 W light bulb has of charge per unit time: = . Unit of current: Ampere (A). The purpose of a battery is to produce

Yu, Jaehoon

16

An assessment of current and proposed methodologies for estimating effective dose equivalent from non-uniform external photon radiation  

E-Print Network [OSTI]

voluntarily from various nuclear power plants throughout the United States were used. The data were analyzed with respect to the current practice of assigning the highest whole body multibadging dosimeter reading as the dose of record pursuant to 10 CFR (Code...

Hay, Michael Charles

2012-06-07T23:59:59.000Z

17

Estimation of spin-diffusion length from the magnitude of spin-current absorption: Multiterminal ferromagnetic/nonferromagnetic hybrid structures  

E-Print Network [OSTI]

to large sample dimensions. The current perpendicular to plane CPP giant magnetoresistance measurements by the spacer thickness.5 This tech- nique is suitable for the N layer with magnetic or even non- magnetic of the difficulty in pre- paring a CPP device with the thickness of the N spacer as thick as the spin diffusion

Otani, Yoshichika

18

A database for estimating organ dose for coronary angiography and brain perfusion CT scans for arbitrary spectra and angular tube current modulation  

SciTech Connect (OSTI)

Purpose: The purpose of this study was to develop a database for estimating organ dose in a voxelized patient model for coronary angiography and brain perfusion CT acquisitions with any spectra and angular tube current modulation setting. The database enables organ dose estimation for existing and novel acquisition techniques without requiring Monte Carlo simulations. Methods: The study simulated transport of monoenergetic photons between 5 and 150 keV for 1000 projections over 360 Degree-Sign through anthropomorphic voxelized female chest and head (0 Degree-Sign and 30 Degree-Sign tilt) phantoms and standard head and body CTDI dosimetry cylinders. The simulations resulted in tables of normalized dose deposition for several radiosensitive organs quantifying the organ dose per emitted photon for each incident photon energy and projection angle for coronary angiography and brain perfusion acquisitions. The values in a table can be multiplied by an incident spectrum and number of photons at each projection angle and then summed across all energies and angles to estimate total organ dose. Scanner-specific organ dose may be approximated by normalizing the database-estimated organ dose by the database-estimated CTDI{sub vol} and multiplying by a physical CTDI{sub vol} measurement. Two examples are provided demonstrating how to use the tables to estimate relative organ dose. In the first, the change in breast and lung dose during coronary angiography CT scans is calculated for reduced kVp, angular tube current modulation, and partial angle scanning protocols relative to a reference protocol. In the second example, the change in dose to the eye lens is calculated for a brain perfusion CT acquisition in which the gantry is tilted 30 Degree-Sign relative to a nontilted scan. Results: Our database provides tables of normalized dose deposition for several radiosensitive organs irradiated during coronary angiography and brain perfusion CT scans. Validation results indicate total organ doses calculated using our database are within 1% of those calculated using Monte Carlo simulations with the same geometry and scan parameters for all organs except red bone marrow (within 6%), and within 23% of published estimates for different voxelized phantoms. Results from the example of using the database to estimate organ dose for coronary angiography CT acquisitions show 2.1%, 1.1%, and -32% change in breast dose and 2.1%, -0.74%, and 4.7% change in lung dose for reduced kVp, tube current modulated, and partial angle protocols, respectively, relative to the reference protocol. Results show -19.2% difference in dose to eye lens for a tilted scan relative to a nontilted scan. The reported relative changes in organ doses are presented without quantification of image quality and are for the sole purpose of demonstrating the use of the proposed database. Conclusions: The proposed database and calculation method enable the estimation of organ dose for coronary angiography and brain perfusion CT scans utilizing any spectral shape and angular tube current modulation scheme by taking advantage of the precalculated Monte Carlo simulation results. The database can be used in conjunction with image quality studies to develop optimized acquisition techniques and may be particularly beneficial for optimizing dual kVp acquisitions for which numerous kV, mA, and filtration combinations may be investigated.

Rupcich, Franco; Badal, Andreu; Kyprianou, Iacovos; Schmidt, Taly Gilat [Department of Biomedical Engineering, Marquette University, Milwaukee, Wisconsin 53233 (United States); Division of Imaging and Applied Mathematics (OSEL/CDRH), US Food and Drug Administration, Silver Spring, Maryland 20905 (United States); Department of Biomedical Engineering, Marquette University, Milwaukee, Wisconsin 53233 (United States)

2012-09-15T23:59:59.000Z

19

Proceedings, Dean's Day 1999  

SciTech Connect (OSTI)

On January 14--15, 1999, Sandia National Laboratories sponsored Deans Day, a conference for the Deans of Engineering and other executive-level representatives from 29 invited universities. Through breakout sessions and a wrap-up discussion, university and Sandia participants identified activities to further develop their strategic relationships. The four primary activities are: (A) concentrate joint efforts on current and future research strengths and needs; (B) attract the best students (at all grade levels) to science and engineering; (C) promote awareness of the need for and work together to influence a national science and technology R and D policy; and (D) enable the universities and Sandia to be true allies, jointly pursuing research opportunities and funding from government agencies and industry.

Zanner, M.A.

1999-03-01T23:59:59.000Z

20

Experimental program for the development of peat gasification. Process designs and cost estimates for the manufacture of 250 billion Btu/day SNG from peat by the PEATGAS Process. Interim report No. 8  

SciTech Connect (OSTI)

This report presents process designs for the manufacture of 250 billion Btu's per day of SNG by the PEATGAS Process from peats. The purpose is to provide a preliminary assessment of the process requirements and economics of converting peat to SNG by the PEATGAS Process and to provide information needed for the Department of Energy (DOE) to plan the scope of future peat gasification studies. In the process design now being presented, peat is dried to 35% moisture before feeding to the PEATGAS reactor. This is the basic difference between the Minnesota peat case discussed in the current report and that presented in the Interim Report No. 5. The current design has overall economic advantages over the previous design. In the PEATGAS Process, peat is gasified at 500 psig in a two-stage reactor consisting of an entrained-flow hydrogasifier followed by a fluidized-bed char gasifier using steam and oxygen. The gasifier operating conditions and performance are necessarily based on the gasification kinetic model developed for the PEATGAS reactor using the laboratory- and PDU-scale data as of March 1978 and April 1979, respectively. On the basis of the available data, this study concludes that, although peat is a low-bulk density and low heating value material requiring large solids handling costs, the conversion of peat to SNG appears competitive with other alternatives being considered for producing SNG because of its very favorable gasification characteristics (high methane formation tendency and high reactivity). As a direct result of the encouraging technical and economic results, DOE is planning to modify the HYGAS facility in order to begin a peat gasification pilot plant project.

Arora, J.L.; Tsaros, C.L.

1980-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

E-Science Day  

E-Print Network [OSTI]

on December 6, 2011, E-Science Day was a day-long event,regional librarians in e-science, and to expose regionalthe initiation of e-science support projects within their

Abad, Raquel

2012-01-01T23:59:59.000Z

22

Argonne's Earth Day 2011  

ScienceCinema (OSTI)

Argonne celebrated Earth Day on April 21, 2011 with an event that featured green activities and information booths.

None

2013-04-19T23:59:59.000Z

23

REX WALHEIM, MS-2 (GREEN) Meal Day 1* Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 -JULY 4th MEAL  

E-Print Network [OSTI]

Special Meal **Day 13 consists of Meals A and B only (B) - Beverage, (FF) - Fresh Food, (I) - Irradiated

24

Polarized electron beams at milliampere average current  

SciTech Connect (OSTI)

This contribution describes some of the challenges associated with developing a polarized electron source capable of uninterrupted days-long operation at milliAmpere average beam current with polarization greater than 80%. Challenges will be presented in the context of assessing the required level of extrapolation beyond the performance of today's CEBAF polarized source operating at ~ 200 uA average current. Estimates of performance at higher current will be based on hours-long demonstrations at 1 and 4 mA. Particular attention will be paid to beam-related lifetime-limiting mechanisms, and strategies to construct a photogun that operate reliably at bias voltage > 350kV.

Poelker, Matthew [JLAB

2013-11-01T23:59:59.000Z

25

National Day of Remembrance  

SciTech Connect (OSTI)

Ames Laboratory observed the National Day of Remembrance for weapons workers from the Cold War era with a ceremony held Oct. 27, 2009 at the Ames Public Library.

None

2010-01-01T23:59:59.000Z

26

Conflict Resolution Day  

Broader source: Energy.gov [DOE]

Conflict Resolution Day takes a look at mediation, conciliation, negotiation, arbitration, the ombudsman, and facilitation to resolve conflict in the workplace. Employees and contractors are...

27

Earth Day, Every Day | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ ContractConsumerofof EnergyEarth Day,

28

Holocaust Days of Remembrance  

Broader source: Energy.gov [DOE]

The United States Congress established the Days of Remembrance as our nationís annual commemoration of the Holocaust and created the United States Holocaust Memorial Museum as a permanent living...

29

Foundation Day Meeting  

E-Print Network [OSTI]

War occurred on National Foundation Day? Hard to say but it must have pleased Tangun who founded Korea 4,340 years ago. Tangun is believed to be the son of a god and a woman transformed from a bear and is said to have established his kingdom...

Hacker, Randi; Tsutsui, William; Haufler, Marsha

2007-11-28T23:59:59.000Z

30

Journal of Coastal Research, Special Issue No. XX, 2014 On the use of the Radon transform to estimate longshore currents from video imagery 1  

E-Print Network [OSTI]

energetic, Chile, country partner of the project, plans to invest in this renewable energy. The multi observations to determine the energy potential of a site. For this, we need to estimate the average period (Durban, South Africa), Journal of Coastal Research, Special Issue No. 66, pp. xxx-xxx, ISSN 0749

31

Postdoc Research Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenterYouPortsmouth/PaducahNREL'sResearch Day

32

Earth Day 2010: Earth Day 40th Anniversary Poster  

E-Print Network [OSTI]

EGJ Issue 30 Earth Day 2010 ISSN 1076-7975 In celebration of 40 Earth Day the Electronic GreenEconomics, Poznan, Poland. Earth image used from www.sxc.hu.

Nowacka, Izabela

2010-01-01T23:59:59.000Z

33

Polarized electron beams at milliampere average current  

SciTech Connect (OSTI)

This contribution describes some of the challenges associated with developing a polarized electron source capable of uninterrupted days-long operation at milliAmpere average beam current with polarization greater than 80%. Challenges will be presented in the context of assessing the required level of extrapolation beyond the performance of todayís CEBAF polarized source operating at ? 200 uA average current. Estimates of performance at higher current will be based on hours-long demonstrations at 1 and 4 mA. Particular attention will be paid to beam-related lifetime-limiting mechanisms, and strategies to construct a photogun that operate reliably at bias voltage > 350kV.

Poelker, M. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia 23606 (United States)

2013-11-07T23:59:59.000Z

34

Estimating Methods  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Based on the project's scope, the purpose of the estimate, and the availability of estimating resources, the estimator can choose one or a combination of techniques when estimating an activity or project. Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

1997-03-28T23:59:59.000Z

35

Earth Day 2014 Photo Contest  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Earth Day 2014 Photo Contest CALLING ALL PHOTOGRAPHERS Professionals, amateurs, and the camera sharp shooter We invite all DOE employees and DOE contractors to share images of...

36

George Washington Carver Recognition Day  

Broader source: Energy.gov [DOE]

In commemoration of George Washington Carverís life and work, Congress declared January 5 as George Washington Carver Recognition Day.

37

Dimension Estimation-based Spectrum Sens-ing for Cognitive Radio  

E-Print Network [OSTI]

Dimension Estimation-based Spectrum Sens- ing for Cognitive Radio Bassem Zayen and Aawatif Hayar. Introduction The discrepancy between current-day spectrum allocation and spectrum use sug- gests that radio mean that radios could find and adapt to any immediate local spectrum availability. A new class

Gesbert, David

38

Trinity College Day Information Booklet  

E-Print Network [OSTI]

time places and caters for children aged 3 months to 4.5 years. It is managed on a day to day basis by the nursery manager, supervisor and deputy supervisor, and is supported and advised by a Nursery Advisory, Nursery Manager, Supervisor and Representative of Staff members of the Nursery, Students Parents, Staff

O'Mahony, Donal E.

39

How Do You Observe Earth Day Every Day? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Observe Earth Day Every Day? How Do You Observe Earth Day Every Day? April 23, 2009 - 1:44pm Addthis Yesterday was officially Earth Day, but really, every day should be Earth Day....

40

Current Rusume  

E-Print Network [OSTI]

Research Interest Rough paths theory, Stochastic differential equations, ... I am currently working on a problem about stochastic analysis on Riemannian folia-.

2015-02-09T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

ONE DAY ON SHAPE OPTIMIZATION  

E-Print Network [OSTI]

ONE DAY ON SHAPE OPTIMIZATION Tuesday November 17, 2009 Aula Buzano - Dipartimento di Matematica to "Shape Optimization", a very active research field which combines techniques from several areas of mathematics to set out and solve problems where the optimal shape of an object has to be determined, in order

Ceragioli, Francesca

42

Argonne's 2012 Earth Day Event  

SciTech Connect (OSTI)

Argonne's 2012 Earth Day event drew crowds from across the laboratory. Argonne and U.S. Department of Energy employees toured booths and interactive displays set up by Argonne programs and clubs. Several of Argonne's partners participated, including U.S. Department of Energy, University of Chicago, Abri Credit Union, DuPage County Forest Preserve, DuPage Water Commission, PACE and Morton Arboretum. Argonne scientists and engineers also participated in a poster session, discussing their clean energy research.

None

2012-01-01T23:59:59.000Z

43

Memorial Day | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department of EnergyDevelopmentTechnologies |Charles Page -to DOE re5,Memorial Day

44

Argonne's 2012 Earth Day Event  

ScienceCinema (OSTI)

Argonne's 2012 Earth Day event drew crowds from across the laboratory. Argonne and U.S. Department of Energy employees toured booths and interactive displays set up by Argonne programs and clubs. Several of Argonne's partners participated, including U.S. Department of Energy, University of Chicago, Abri Credit Union, DuPage County Forest Preserve, DuPage Water Commission, PACE and Morton Arboretum. Argonne scientists and engineers also participated in a poster session, discussing their clean energy research.

None

2013-04-19T23:59:59.000Z

45

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

46

Museum Day at Bradbury Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource ProgramModificationEnzyme-Functionalized GoldMuonMuseum Day at

47

Celebrate Earth Day! | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Earth Day Celebrate Earth Day April 20, 2010 - 10:25am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory Earth Day is a great time to commit...

48

Current Titles  

SciTech Connect (OSTI)

This booklet is published for those interested in current research being conducted at the National Center for Electron Microscopy. The NCEM is a DOE-designated national user facility and is available at no charge to qualified researchers. Access is controlled by an external steering committee. Interested researchers may contact Jane Cavlina, Administrator, at 510/486-6036.

Various

2006-06-01T23:59:59.000Z

49

Sub-Second Parallel State Estimation  

SciTech Connect (OSTI)

This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-daysí worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than todayís commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimatorís single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operatorsí actions and automated controls to mitigate effects of severe events on the grid. The power grid continues to grow and the number of measurements is increasing at an accelerated rate due to the variety of smart grid devices being introduced. A parallel state estimation implementation will have better performance than traditional, sequential state estimation by utilizing the power of high performance computing (HPC). This increased performance positions parallel state estimators as valuable tools for operating the increasingly more complex power grid.

Chen, Yousu; Rice, Mark J.; Glaesemann, Kurt R.; Wang, Shaobu; Huang, Zhenyu

2014-10-31T23:59:59.000Z

50

Joint Capability Technology Demonstration (JCTD) Industry Day...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Joint Capability Technology Demonstration (JCTD) Industry Day Agenda Joint Capability Technology Demonstration (JCTD) Industry Day Agenda Agenda outlines the activities of the 2014...

51

Invitation/Program Technology Watch Day on Future Biofuels  

E-Print Network [OSTI]

Invitation/Program Technology Watch Day on Future Biofuels and 4. TMFB International Workshop;International Research Centers Focussing on Future Biofuels are Presenting Their Research Approaches and Current Concerning Future Biofuels DBFZ ­ Deutsches Biomasseforschungszentrum M. Seiffert, F. Mueller-Langer German

52

Earth Day 2012: A Day to Remember the Past and Shape the Future...  

Broader source: Energy.gov (indexed) [DOE]

Earth Day 2012: A Day to Remember the Past and Shape the Future Earth Day 2012: A Day to Remember the Past and Shape the Future April 26, 2012 - 10:10am Addthis Eric Barendsen...

53

Current Contracts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASLNanoporousTestimonyContact Us -SeparationsRelevantCurrent

54

Types of Cost Estimates - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CURRENT DOE G 430.1-1 Chp 4, Types of Cost Estimates by John Makepeace Functional areas: Procurement, Project Management The chapter describes the estimates required on...

55

Estimation of resources and reserves  

E-Print Network [OSTI]

This report analyzes the economics of resource and reserve estimation. Current concern about energy problems has focused attention on how we measure available energy resources. One reads that we have an eight-year oil ...

Massachusetts Institute of Technology. Energy Laboratory.

1982-01-01T23:59:59.000Z

56

Earth Day 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

celebrating Earth Day all week long. It's Earth Week on Energy.gov We're focusing on climate change, highlighting Earth Day events and sharing ways Americans ActOnClimate --...

57

SHUTTLE MENU STS-135 Stow By Day  

E-Print Network [OSTI]

*Day 1 consists of Meal C only **Day 13 consists of Meals A & B only (B) - Beverage, (FF)- Fresh Food, (I) - Irradiated, (IM) - Intermediate Moisture, (NF) - Natural Form, (R) - Rehydratable, (T

58

IT Job Shadow Day | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IT Job Shadow Day IT Job Shadow Day April 1, 2014 1:00PM to 4:00PM EDT Department of Energy, 1000 Independence Ave SW, Washington DC, Main Auditorium The Department of Energy's...

59

ScheduleDay 1: Molecular Evolution Introduction  

E-Print Network [OSTI]

-Cantor Model Do Exercise Read Ponting, study slides from day 3 and find questions. Day 3: Comparative Genomics Lecture: Comparative Genomics Prepare Projects Practical: Models of Sequence Evolution Read HSW1, study questions. Day 10: Projects Project 1 ­ Population Genomics: Selective Sweeps Project 2 ­ Molecular

Goldschmidt, Christina

60

Business Day Authoritative, informative and timely,  

E-Print Network [OSTI]

Overview #12;Business Day Overview Authoritative, informative and timely, Business Day is a must read for business decision-makers. Business Day has Australia's most influential business writers and commentators who provide up-to-the- minute business news, including context, background and specialist analysis

Peters, Richard

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report  

SciTech Connect (OSTI)

With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

1995-11-01T23:59:59.000Z

62

Department of Industrial Engineering Spring 2014 Estimating Tool for Single-Piece Impeller Milling  

E-Print Network [OSTI]

component of centrifugal compressors. Currently, there is no system in place to estimate the cycle time

Demirel, Melik C.

63

2014 Earth Day Photo Contest Winners  

Energy Savers [EERE]

2014 Earth Day Photo Contest Winners COMMUNITY: "Edison Home" by Gary Hartman SUSTAINABILITY: "Oak Alley" by Wade Sickinger ALTERNATIVE ENERGY: "Windmill Ablaze at Sunset" by Leroy...

64

Innovative Manufacturing Initiative Recognition Day, Advanced...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Publications Innovative Manufacturing Initiative Recognition Day Advanced Manufacturing Office Overview Unlocking the Potential of Additive Manufacturing in the Fuel Cells Industry...

65

Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day  

E-Print Network [OSTI]

Green Clean Day Planning Guide A practical guide for creating a successful Green Clean Day A publication of U of M Waste Management Services July 2013 #12;Table of Contents What is a Green Clean Day? 2 Why have a Green Clean Day? 2 How Do We Get Started? 2 How Waste Management Services Can Help 2

Awtar, Shorya

66

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report  

SciTech Connect (OSTI)

The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

67

Agent Notes Day 4 ~ Health Training  

E-Print Network [OSTI]

≠ Agent Notes Day 4 ~ Health Training In preparation for the Health Day, you could order the National Institute on Aging, National Institutes of Health. To order these free booklets, go to www in the afternoon, and edit your agenda to reflect your choices. Several HealthHints newsletters are referenced

68

Day of Concern Collection / Ture Erickson (collector)  

E-Print Network [OSTI]

Day of Concern Collection / Ture Erickson (collector) Last revised October 2011 University;Collection Description Day of Concern collection / Ture Erickson (collector). ≠ 1984. 6.5 cm of textual records. Collector's Biographical Sketch Born in New Westminster, Ture Erickson became Head of Sedgewick

Handy, Todd C.

69

Proceedings of Hydrology Days 2002, Pages 56 63, April 1 4, 2002 Hydrology Days 2002  

E-Print Network [OSTI]

Proceedings of Hydrology Days 2002, Pages 56 ­ 63, April 1 ­ 4, 2002 Hydrology Days 2002 Real radiography can be used for quantitative imaging of hydrologic phenomena at video frame rates, with great

Deinert, Mark

70

Inter-Agency Holocaust Remberance Day  

Broader source: Energy.gov [DOE]

The ĎDays of Remembranceí honors the six million Jews who were murdered during the Holocaust, and the five million other victims including Soviet prisoners of war, Polish Christians, physically and...

71

Days on market and home sales  

E-Print Network [OSTI]

In 2006, Massachusetts adopted a new policy that prohibits home sellers from resetting their propertiesí days on market through relisting. Massachusetts homes exposed to the policy change experienced a $16,000 reduction ...

Tucker, Catherine Elizabeth

72

30-Day Federal Register Notice - Proposed  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Revised 11-2009 30-Day Federal Register Notice - Proposed 6450-01-P DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice...

73

Day-ying butter ies remain day-ying in a Polynesian, bat-free habitat  

E-Print Network [OSTI]

Day- ying butter ies remain day- ying in a Polynesian, bat-free habitat James H. Fullard Department to study the e¡ects of predators on £ight activity. One major characteristic of day-£ying butter

Fullard, James H.

74

Estimating lightning current moment waveforms from satellite optical measurements  

E-Print Network [OSTI]

, 1997; Cummer and Inan, 2000] and the Schumann resonance analysis techniques [e.g., Burke and Jones resonance radio signatures with photometric behavior observed by the ISUAL, Adachi et al. [2008] derived

California at Berkeley, University of

75

Celebrating Pi Day | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth Day with Secretary Chu CelebratePi Day Celebrating Pi

76

FOREST HEALTH DAY Thursday 20 September 2012  

E-Print Network [OSTI]

Sarah Green, Forest Research 1130 - Comfort break (Tea/Coffee) 1145 - Insect pests of trees in Scotland 272440 There will be no charge for this event. Tea, coffee and a light lunch will be provided and disease issues in the field. #12;FOREST HEALTH DAY 0930 - Registration, tea/coffee 1000 - Welcome

77

One day seminar: Genetics and Genomics of  

E-Print Network [OSTI]

SCHOOL OF MEDICINE One day seminar: Genetics and Genomics of Infectious Diseases Malaria and TB 14th June 2013 University of St Andrews - School of Medicine Pathogen genome research allows exquisite to understanding disease progression. Pathogen genome sequencing is accessible to most. Outputs have broad

Brierley, Andrew

78

Checklist 2 The first days in Germany  

E-Print Network [OSTI]

Checklist 2 The first days in Germany Further information and explanations for the following points (former E111 or E128) or EHIC-Card to one of the social insurers in Germany. You will then be issued in Germany! Only when you have a permanent address you can register with the Citizens' Bureau (B√ľrgerb√ľro

Kemper, Gregor

79

John Day Tailrace MASS2 Hydraulic Modeling  

SciTech Connect (OSTI)

Recent biological results for the Juvenile Bypass System at John Jay Lock and Dam have raised concerns about the hydraulic conditions that are created in the tailrace under different project operations. This Memorandum for Record discusses the development and application of a truncated MASS2 model in the John Day tailrace.

Rakowski, Cynthia L.; Richmond, Marshall C.

2003-06-03T23:59:59.000Z

80

Current measurement apparatus  

DOE Patents [OSTI]

Apparatus and methods are provided for a system for measurement of a current in a conductor such that the conductor current may be momentarily directed to a current measurement element in order to maintain proper current without significantly increasing an amount of power dissipation attributable to the current measurement element or adding resistance to assist in current measurement. The apparatus and methods described herein are useful in superconducting circuits where it is necessary to monitor current carried by the superconducting elements while minimizing the effects of power dissipation attributable to the current measurement element.

Umans, Stephen D. (Belmont, MA)

2008-11-11T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Political Campaigning and Other Non-University Events on Game Days or Major Event Days  

E-Print Network [OSTI]

Political Campaigning and Other Non-University Events on Game Days or Major Event Days This Policy of this is the prohibition of any political signage implanted in, posted on, or otherwise affixed to University property in the political process, subject to other governing policies and procedures. Students: http

Oklahoma, University of

82

NOAA's Arctic Science Days Day 1: Science, Weather and Sea Ice, and International Partnerships  

E-Print Network [OSTI]

NOAA's Arctic Science Days 1 Day 1: Science, Weather and Sea Ice, and International Partnerships 1 Observing Networks [IASOA, RUSALCA, PAG, CBMP & SAON] 2. Ed Farley (NOAA/AFSC, remote): Implications of sea ice loss on NOAA trust resources: NOAA's Loss of Sea Ice (LOSI) Program 3. Sue Moore (NOAA

83

DOE at Day One | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FYGStrategic HumanDOEWellsofat Day

84

DayStar Technologies | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORT Americium/CuriumSunwaysDatang Chifeng Saihanba Wind PowerDayStar

85

What is a High Electric Demand Day?  

Broader source: Energy.gov [DOE]

This presentation by T. McNevin of the New Jersey Bureau of Air Quality Planning was part of the July 2008 Webcast sponsored by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Clean Energy and Air Quality Integration Initiative that was titled Role of Energy Efficiency and Renewable Energy in Improving Air Quality and Addressing Greenhouse Gas Reduction Goals on High Electric Demand Days.

86

Available Alarms in CDE for Next-Day Generation Estimates - March 18, 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis, 2014AutomatedAutomotiveAva

87

Day, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump to:52c8ff988c1 No38e4011f618b No revision hasDawesCounty isDay, Wisconsin:

88

Earth Day Coalition | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified asThis article is a stub. You canAdvantage JumpDay

89

2014 Earth Day | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered¬ČPNGExperience hands-onASTROPHYSICS H.Carbon Storage R&D ProjectEarth Day

90

30-Day Federal Register Notice - Proposed  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 Chief Freedom ofDepartmentto Texas, Missouri and30-Day

91

National Lab Day - Open House | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData andFleetEngineeringAnnual ReportNational Lab Day - Open House

92

SunDay | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen, Minnesota:36052¬į, -97.6114217¬į LoadingEnergy GroupSunConnexSunDay

93

Volunteer Day | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome VelenciaNews CareersStand by:Volunteer Day

94

High-Current Accelerators  

E-Print Network [OSTI]

F i g . 13 F i g . 14 A 48 ACCELERATOR F i g . 25 F i g . 16supply. Extrapolation of accelerator energy and current9 . A-48 high-current accelerator, low-velocity end. Fig.

Lawrence, Ernest O.

1955-01-01T23:59:59.000Z

95

Current to Current | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003)Crowley County,Curran, Illinois: EnergyCurrentCurrent to

96

Secretary Moniz Warms Up For Earth Day Pitch | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Warms Up For Earth Day Pitch Secretary Moniz Warms Up For Earth Day Pitch Addthis Speakers Secretary Ernest Moniz Duration :32...

97

Preindustrial to present-day changes in tropospheric hydroxyl...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Room, GFDL Preindustrial to present-day changes in tropospheric hydroxyl radical and methane lifetime from the ACCMIP Vaishali Naik GFDL Preindustrial to present-day changes in...

98

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

99

Optimal Contract for Wind Power in Day-Ahead Electricity Markets  

E-Print Network [OSTI]

Optimal Contract for Wind Power in Day-Ahead Electricity Markets Desmond W. H. Cai1 Sachin Adlakha2 integration in current electric power systems. In this work, we study how a wind power producer can bid wind power producer will produce as much as wind power is available (up to its contract size). 1

Adlakha, Sachin

100

NNSA Administrator Thomas D'Agostino delivers remarks at DOE's Commemorative Veterans Day Program  

ScienceCinema (OSTI)

Administrator D'Agostino, a Navy veteran, was part of a November 2009 program at DOE headquarters in Washington, D.C., celebrating Veterans Day and commemorating the 10th anniversary of the DOE Veterans Task Force. Veterans comprise nearly 30 percent of NNSA's workforce, and many NNSA employees are currently on active duty.

Administrator D'Agostino

2010-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Generalized computer-assisted operations; A comprehensive system for day-to-day oilfield operations  

SciTech Connect (OSTI)

This paper reports that Shell Oil Co. and a U.S. subsidiary, Shell Western E and P Inc., developed a comprehensive, generalized, computer-assisted-operations (CAO) system for day-to-day oilfield operations. The system addresses many of the daily operating needs of data acquisition, well and facility monitoring and control, problem detection and diagnosis, design and/or redesign of artificial-lift systems, and oilfield data management. It is generalized in that one system, with common computer hardware, software, and techniques, serves several different oil fields with diverse operating requirements and conditions.

Dunham, C.L.; Anderson, S.R. (Shell Oil Co. (US))

1991-03-01T23:59:59.000Z

102

SQA on five dollars a day  

SciTech Connect (OSTI)

This report discusses the following topics: Software safety and reliability issues in safety-related systems; software use control assessment; Testing: Beyond theory; Software process improvement: Formalized unit testing; Software defect analysis for a nuclear weapons application; Function point analysis for estimation of software development schedules; SEI maturity in the Work for Other Program; SSEC SEI experiences; Planning for a Software Engineering Institute (SEI) assessment; Software process improvement, metrics; Software engineering technology plank: Building quality in; Software quality assurance at Y-12; Total quality and SQA at the Kansas City plant; The Software Technology Center at Lawrence Livermore National Laboratory: Software engineering technology transfer in a scientific R&D laboratory; and Institutionalizing the information engineering environment: A practitioner`s perspective.

Not Available

1994-09-01T23:59:59.000Z

103

Using Utility Load Data to Estimate Demand for Space Cooling and Potential for Shiftable Loads  

SciTech Connect (OSTI)

This paper describes a simple method to estimate hourly cooling demand from historical utility load data. It compares total hourly demand to demand on cool days and compares these estimates of total cooling demand to previous regional and national estimates. Load profiles generated from this method may be used to estimate the potential for aggregated demand response or load shifting via cold storage.

Denholm, P.; Ong, S.; Booten, C.

2012-05-01T23:59:59.000Z

104

Electric current locator  

DOE Patents [OSTI]

The disclosure herein provides an apparatus for location of a quantity of current vectors in an electrical device, where the current vector has a known direction and a known relative magnitude to an input current supplied to the electrical device. Mathematical constants used in Biot-Savart superposition equations are determined for the electrical device, the orientation of the apparatus, and relative magnitude of the current vector and the input current, and the apparatus utilizes magnetic field sensors oriented to a sensing plane to provide current vector location based on the solution of the Biot-Savart superposition equations. Description of required orientations between the apparatus and the electrical device are disclosed and various methods of determining the mathematical constants are presented.

King, Paul E. (Corvallis, OR); Woodside, Charles Rigel (Corvallis, OR)

2012-02-07T23:59:59.000Z

105

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

106

Current Testbed Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current Testbed Research Previous Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

107

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010  

SciTech Connect (OSTI)

This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

108

Current to Current Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003)Crowley County,Curran, Illinois: EnergyCurrent

109

Ultracapacitor current collector  

DOE Patents [OSTI]

An ultracapacitor having two solid, nonporous current collectors, two porous electrodes separating the collectors, a porous separator between the electrodes and an electrolyte occupying the pores in the electrodes and separator. At least one of the current collectors comprises a conductive metal substrate coated with a metal nitride, carbide or boride coating.

Jerabek, Elihu Calfin (Glenmont, NY); Mikkor, Mati (Ann Arbor, MI)

2001-10-16T23:59:59.000Z

110

Characterizing the Weather Band Variability of the Texas Coastal Current  

E-Print Network [OSTI]

the weather band frequencies (2-15 days). Currents with longer persistence are found to be relatively slow, generally below 10 cm s^(-1). Fast currents (> 50 cm s^(-1)) tend to be short-lived, typically lasting less than 72 hours. Maximum upcoast transport...

Zimmerle, Heather

2014-07-17T23:59:59.000Z

111

Voltage controlled current source  

DOE Patents [OSTI]

A seven decade, voltage controlled current source is described for use in testing intermediate range nuclear instruments that covers the entire test current range of from 10 picoamperes to 100 microamperes. High accuracy is obtained throughout the entire seven decades of output current with circuitry that includes a coordinated switching scheme responsive to the input signal from a hybrid computer to control the input voltage to an antilog amplifier, and to selectively connect a resistance to the antilog amplifier output to provide a continuous output current source as a function of a preset range of input voltage. An operator controlled switch provides current adjustment for operation in either a real-time simulation test mode or a time response test mode.

Casne, Gregory M. (Pittsburgh, PA)

1992-01-01T23:59:59.000Z

112

A comparison of the initial and conditional probabilities for dry-day sequences in Texas  

E-Print Network [OSTI]

improves with increasing threshold. I rom this ir formation a romngram was constructed for th& purpose of graph Lcaily estimating the conditional probability given a value of the initial probability (for. any day t). Original. regression equations were... modified such that the modified regression lir ca conformed to theoretically correct con liticns and parsed through point (1, 1) of t' he. nomogram. The nocitivc r . latior el, ip is maintained bctwccn t!. e initial aud conc!itionai probabilities...

Fresh, Herman Elwood

1972-01-01T23:59:59.000Z

113

D&D Waste Estimate Validation  

SciTech Connect (OSTI)

Rocky Flats Closure Project (Site) includes several multi-year decontamination and decommissioning (D&D) projects which, over the next four years, will dismantle and demolish four major plutonium facilities, four major uranium facilities, and over 400 additional facilities of different types. The projects are currently generating large quantities of transuranic, low-level, mixed, hazardous, and sanitary wastes. A previous paper described the initial conceptual estimates and methods, and the evolution of these methods based on the actual results from the decommissioning of a ''pilot'' facility. The waste estimating method that resulted from that work was used for the waste estimates incorporated into the current Site baseline. This paper discusses subsequent developments on the topic of waste estimating that have occurred since the baseline work. After several months of operation under the current Site baseline, an effort was initiated to either validate or identify improvements to the waste basis-of-estimate. Specific estimate and estimating method elements were identified for additional analysis based on the element's potential for error and the impact of that error on Site activities. The analysis took advantage of actual, more detailed data collected both from three years additional experience in decommissioning a second plutonium facility and from experience in deactivating certain non-plutonium facilities. It compared the actual transuranic and low-level waste generation against their respective estimates based on overall distribution and for individual media (i.e. equipment type), and evaluated trends. Finally, it projected the quantity of lead-characteristic low-level mixed waste that will be generated from plutonium building decommissioning and upgraded the decommissioning waste estimates of the non-plutonium buildings.

Sanford, P. C.; Templeton, J. H.; Stevens, J. L.; Dorr, K.

2002-02-25T23:59:59.000Z

114

Types of Cost Estimates  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

1997-03-28T23:59:59.000Z

115

Thermal drawdown analysis of the Hijiori HDR 90-day circulation test  

SciTech Connect (OSTI)

The Hijiori 90-day circulation test is unique in the development of HDR technology in that it was the first (and thus far the only) multiproduction well test run for a sufficient production period to obtain observed cooldown curves at multiple production horizons in the stimulated reservoir volume. The experimental data have been analyzed by the SGP 1-D linear heat sweep model to examine the extent of thermal cooldown in this relatively small, multi-well, multi-zone reservoir. Although changes in production flow were carried out in specific wells at specific times during the 90 days of circulation, matching of the observed cooldown curves in conjunction with the structural and temperature logging data allows estimation of the reservoir volume and the mean fracture spacing between rock blocks for heat extraction during the 90-day test.

Kruger, Paul; Yamaguchi, Tsutomu

1993-01-28T23:59:59.000Z

116

Systems Engineering Cost Estimation  

E-Print Network [OSTI]

on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

Bryson, Joanna J.

117

Current control circuitry  

DOE Patents [OSTI]

Among the embodiments of the present invention is an apparatus that includes a transistor (30), a servo device (40), and a current source (50). The servo device (40) is operable to provide a common base mode of operation of the transistor (30) by maintaining an approximately constant voltage level at the transistor base (32b). The current source (150) is operable to provide a bias current to the transistor (30). A first device (24) provides an input signal to an electrical node (70) positioned between the emitter (32e) of the transistor (30) and the current source (50). A second device (26) receives an output signal from the collector (32c) of the transistor (30).

Taubman, Matthew S. (Richland, WA)

2005-03-15T23:59:59.000Z

118

Geothermal Energy: Current abstracts  

SciTech Connect (OSTI)

This bulletin announces the current worldwide information available on the technologies required for economic recovery of geothermal energy and its use as direct heat or for electric power production. (ACR)

Ringe, A.C. (ed.)

1988-02-01T23:59:59.000Z

119

Energy Department's Race to 7-Day Solar Prize Competition to...  

Office of Environmental Management (EM)

Race to 7-Day Solar Prize Competition to Speed Solar Deployment Energy Department's Race to 7-Day Solar Prize Competition to Speed Solar Deployment March 4, 2015 - 2:48pm Addthis...

120

DOE Headquarters Earth Day 2014 | Department of Energy  

Office of Environmental Management (EM)

DOE Headquarters Earth Day 2014 DOE Headquarters Earth Day 2014 earthday2011lg.png Save the Date - April 22, 2014 April 22, 2014, is the 44th anniversary of the founding of Earth...

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Amphibian Decline or Extinction? Current Declines Dwarf Background Extinction Rate  

E-Print Network [OSTI]

the background amphibian extinction rate. If current estimates of amphibian species in imminent danger). Although it is thought that 35 species of amphibians have gone extinct since 1500, this number may). Another 1,896 species may be in imminent danger of extinction (IUCN et al., 2006). All of these estimates

McCallum, Malcolm

122

Beam current sensor  

DOE Patents [OSTI]

A current sensor for measuring the dc component of a beam of charged particles employs a superconducting pick-up loop probe, with twisted superconducting leads in combination with a Superconducting Quantum Interference Device (SQUID) detector. The pick-up probe is in the form of a single-turn loop, or a cylindrical toroid, through which the beam is directed and within which a first magnetic flux is excluded by the Meisner effect. The SQUID detector acts as a flux-to-voltage converter in providing a current to the pick-up loop so as to establish a second magnetic flux within the electrode which nulls out the first magnetic flux. A feedback voltage within the SQUID detector represents the beam current of the particles which transit the pick-up loop. Meisner effect currents prevent changes in the magnetic field within the toroidal pick-up loop and produce a current signal independent of the beam's cross-section and its position within the toroid, while the combination of superconducting elements provides current measurement sensitivities in the nano-ampere range.

Kuchnir, M.; Mills, F.E.

1984-09-28T23:59:59.000Z

123

Beam current sensor  

DOE Patents [OSTI]

A current sensor for measuring the DC component of a beam of charged particles employs a superconducting pick-up loop probe, with twisted superconducting leads in combination with a Superconducting Quantum Interference Device (SQUID) detector. The pick-up probe is in the form of a single-turn loop, or a cylindrical toroid, through which the beam is directed and within which a first magnetic flux is excluded by the Meisner effect. The SQUID detector acts as a flux-to-voltage converter in providing a current to the pick-up loop so as to establish a second magnetic flux within the electrode which nulls out the first magnetic flux. A feedback voltage within the SQUID detector represents the beam current of the particles which transit the pick-up loop. Meisner effect currents prevent changes in the magnetic field within the toroidal pick-up loop and produce a current signal independent of the beam's cross-section and its position within the toroid, while the combination of superconducting elements provides current measurement sensitivites in the nano-ampere range.

Kuchnir, Moyses (Elmhurst, IL); Mills, Frederick E. (Elburn, IL)

1987-01-01T23:59:59.000Z

124

Processing Transactions that have Exceeded the 90-day Guideline  

E-Print Network [OSTI]

journal. It appears when correcting a journal that posted over 90-days ago or when recording a sale more than 90 days after the actual date of sale. Step 1: Access the 90-day form When a 90-day form to ASRSP at (847) 467-2557 in EV or (312) 503-0873 in CH. If you do not have a fax machine, you may send

Shull, Kenneth R.

125

China, March 2005 DAY 1: FLYING TO MUNICH & SHANGHAI  

E-Print Network [OSTI]

China, March 2005 DAY 1: FLYING TO MUNICH & SHANGHAI March 12. Saturday Waking up time: 8.30 am. I, lived one year in Beijing and told me lots of stuff about China, where to go, what to do, how in Namibia at Christmas, making me extremely jealous. DAY 2: FIRST DAY IN SHANGHAI, CHINA March 13. Sunday

California at Santa Cruz, University of

126

Current Status of Concentrator Photovoltaic (CPV) Technology  

SciTech Connect (OSTI)

This report describes the current status of the market and technology for concentrator photovoltaic (CPV) cells and modules. Significant progress in CPV has been achieved, including record efficiencies for modules (36.7%) and cells (46%), as well as growth of large field installations in recent years. CPV technology may also have the potential to be cost-competitive on a levelized cost of energy (LCOE) basis in regions of high direct normal irradiance (DNI). The study includes an overview of all installations larger than 1 MW, information on companies currently active in the CPV field, efficiency data, and estimates of the LCOE in different scenarios.

Philipps, S. P.; Bett, A. W.; Horowitz, K.; Kurtz, S.

2015-01-01T23:59:59.000Z

127

14UO TANK,OPENING REPORT NO.5. October 20th -November 26th (37 days total; 27 working days).  

E-Print Network [OSTI]

14UO TANK,OPENING REPORT NO.5. October 20th - November 26th (37 days total; 27 working days). Since the tank was last closed the accelerator ran for 97 days.until this opening which was scheduled to replace was done during the tank-open period. We believe that there would be value in gIvIng our assessments

Chen, Ying

128

Estimating pixel variances in the scenes of staring sensors  

DOE Patents [OSTI]

A technique for detecting changes in a scene perceived by a staring sensor is disclosed. The technique includes acquiring a reference image frame and a current image frame of a scene with the staring sensor. A raw difference frame is generated based upon differences between the reference image frame and the current image frame. Pixel error estimates are generated for each pixel in the raw difference frame based at least in part upon spatial error estimates related to spatial intensity gradients in the scene. The pixel error estimates are used to mitigate effects of camera jitter in the scene between the current image frame and the reference image frame.

Simonson, Katherine M. (Cedar Crest, NM); Ma, Tian J. (Albuquerque, NM)

2012-01-24T23:59:59.000Z

129

Fault current limiter  

DOE Patents [OSTI]

A fault current limiter (FCL) includes a series of high permeability posts for collectively define a core for the FCL. A DC coil, for the purposes of saturating a portion of the high permeability posts, surrounds the complete structure outside of an enclosure in the form of a vessel. The vessel contains a dielectric insulation medium. AC coils, for transporting AC current, are wound on insulating formers and electrically interconnected to each other in a manner such that the senses of the magnetic field produced by each AC coil in the corresponding high permeability core are opposing. There are insulation barriers between phases to improve dielectric withstand properties of the dielectric medium.

Darmann, Francis Anthony

2013-10-08T23:59:59.000Z

130

Current address: Samuel Johnson  

E-Print Network [OSTI]

CV: E-mail : Homepage: Current address: Samuel Johnson samuel.johnson@imperial.ac.uk www. #12;Submitted work 1. The meaning of niche: Cause or consequence of food-web structure?, S. Johnson, V learning, S. Johnson, J. Marro, and J.J. Torres, PLoS ONE 8(1): e50276 (2013) 3. Enhancing neural network

Johnson, Samuel

131

Hydrogen Delivery- Current Technology  

Broader source: Energy.gov [DOE]

Hydrogen is transported from the point of production to the point of use via pipeline, over the road in cryogenic liquid trucks or gaseous tube trailers, or by rail or barge. Read on to learn more about current hydrogen delivery and storage technologies.

132

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-02-01T23:59:59.000Z

133

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-06-01T23:59:59.000Z

134

Day-Ahead premiums on the Midwest ISO  

SciTech Connect (OSTI)

An examination of day-ahead premiums for the Midwest ISO from September 2005 to December 2007 reveals that premiums are positive and statistically significant across all five hubs, indicating inefficiency in the Midwest wholesale electricity market. Further, day-ahead premiums exhibit monthly seasonal variation with some indication of the day-ahead premiums declining over time in three of the five hubs. (author)

Bowden, Nicholas; Hu, Su; Payne, James

2009-03-15T23:59:59.000Z

135

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

136

Cooling load estimation methods  

SciTech Connect (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

137

Argonne Celebrates Earth Day 2013: It's Easy Being Green  

SciTech Connect (OSTI)

Argonne's April 23, 2013 Earth Day celebration featured "green" R&D conducted at the lab and interactive displays and fun activities that engage the laboratory community.

Paul Kearns; Pam Sydelko; Ray Bair; Stephen Streiffer; Brian Stephenson

2013-04-17T23:59:59.000Z

138

Optimization Online - Optimal Job Scheduling with Day-ahead Price ...  

E-Print Network [OSTI]

Aug 17, 2011 ... Optimal Job Scheduling with Day-ahead Price and Random Local Distributed Generation: A Two-stage Robust Approach.

Anna Danandeh

2011-08-17T23:59:59.000Z

139

2014 Advanced Grid Modeling Peer Review Presentations - Day One...  

Broader source: Energy.gov (indexed) [DOE]

Morning Session 2014 Advanced Grid Modeling Peer Review Presentations - Day One Morning Session The Office of Electricity Delivery and Energy Reliability held a peer review of the...

140

Argonne Celebrates Earth Day 2013: It's Easy Being Green  

ScienceCinema (OSTI)

Argonne's April 23, 2013 Earth Day celebration featured "green" R&D conducted at the lab and interactive displays and fun activities that engage the laboratory community.

Paul Kearns; Pam Sydelko; Ray Bair; Stephen Streiffer; Brian Stephenson;

2013-06-10T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

2012 Smart Grid Peer Review Presentations - Day 1 Afternoon Session...  

Broader source: Energy.gov (indexed) [DOE]

from Day 1 afternoon sessions are below. Moderators: Eric Lightner and Merrill Smith 2012 SG Peer Review - GridWise Architecture Council - Ron Melton, PNNL 2012 SG Peer...

142

2012 Smart Grid Peer Review Presentations - Day 2 First Afternoon...  

Broader source: Energy.gov (indexed) [DOE]

First Afternoon Session 2012 Smart Grid Peer Review Presentations - Day 2 First Afternoon Session The Office of Electricity Delivery and Energy Reliability held its bi-annual peer...

143

2012 Smart Grid Peer Review Presentations - Day 2 Smart Grid...  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid Panel Discussion 2012 Smart Grid Peer Review Presentations - Day 2 Smart Grid Panel Discussion The Office of Electricity Delivery and Energy Reliability held its...

144

2012 Smart Grid Peer Review Presentations - Day 2 Second Afternoon...  

Broader source: Energy.gov (indexed) [DOE]

Second Afternoon Session 2012 Smart Grid Peer Review Presentations - Day 2 Second Afternoon Session The Office of Electricity Delivery and Energy Reliability held its bi-annual...

145

AMO Industry Day Workshop, February 25th, Targets Smart Manufacturing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Addthis AMO will host an Industry Day workshop to explain the concept, vision, and technology needs associated with support for a Clean Energy Manufacturing Innovation Institute...

146

Aternating current photovoltaic building block  

DOE Patents [OSTI]

A modular apparatus for and method of alternating current photovoltaic power generation comprising via a photovoltaic module, generating power in the form of direct current; and converting direct current to alternating current and exporting power via one or more power conversion and transfer units attached to the module, each unit comprising a unitary housing extending a length or width of the module, which housing comprises: contact means for receiving direct current from the module; one or more direct current-to-alternating current inverters; an alternating current bus; and contact means for receiving alternating current from the one or more inverters.

Bower, Ward Issac; Thomas, Michael G.; Ruby, Douglas S.

2004-06-15T23:59:59.000Z

147

Current Annualized Request  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FY 2012 FY 2013 FY 2014 Current

148

Escapement and Productivity of Spring Chinook Salmon and Summer Steelhead in the John Day River Basin, 2005-2006 Annual Technical Report.  

SciTech Connect (OSTI)

The objectives are: (1) Estimate number and distribution of spring Chinook salmon Oncorhynchus tshawytscha redds and spawners in the John Day River subbasin; and (2) Estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook and summer steelhead O. mykiss and life history characteristics of summer steelhead. The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations, however, remain depressed relative to historic levels. Between the completion of the life history and natural escapement study in 1984 and the start of this project in 1998, spring Chinook spawning surveys did not provide adequate information to assess age structure, progeny-to-parent production values, smolt-to-adult survival (SAR), or natural spawning escapement. Further, only very limited information is available for steelhead life history, escapement, and productivity measures in the John Day subbasin. Numerous habitat protection and rehabilitation projects to improve salmonid freshwater production and survival have also been implemented in the basin and are in need of effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed background information for developing context for project-specific effectiveness monitoring efforts. To meet the data needs as index stocks, to assess the long-term effectiveness of habitat projects, and to differentiate freshwater and ocean survival, sufficient annual estimates of spawner escapement, age structure, SAR, egg-to-smolt survival, smolt-per-redd ratio, and freshwater habitat use are essential. We have begun to meet this need through spawning ground surveys initiated for spring Chinook salmon in 1998 and smolt PIT-tagging efforts initiated in 1999. Additional sampling and analyses to meet these goals include an estimate of smolt abundance and SAR rates, and an updated measure of the freshwater distribution of critical life stages. Because Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin (Schaller et al. 1999) we continue our ongoing studies. This project is high priority based on the high level of emphasis the NWPPC Fish and Wildlife Program, Subbasin Summaries, NMFS, and the Oregon Plan for Salmon and Watersheds have placed on monitoring and evaluation to provide the real-time data to guide restoration and adaptive management in the region. By implementing the proposed program we have been able to address many of the goals for population status monitoring, such as defining areas currently used by spring Chinook for holding and spawning habitats and determining range expansion or contraction of summer rearing and spawning populations. The BiOp describes these goals as defining population growth rates (adult monitoring), detecting changes in those growth rates or relative abundance in a reasonable time (adult/juvenile monitoring), estimating juvenile abundance and survival rates (juvenile/smolt monitoring), and identifying stage-specific survival (adult-to-smolt, smolt-to-adult).

Schultz, Terra Lang; Wilson, Wayne H.; Ruzycki, James R. [Oregon Department of Fish and Wildlife

2009-04-10T23:59:59.000Z

149

Estimating Power System Dynamic States Using Extended Kalman Filter  

SciTech Connect (OSTI)

AbstractóThe state estimation tools which are currently deployed in power system control rooms are based on a steady state assumption. As a result, the suite of operational tools that rely on state estimation results as inputs do not have dynamic information available and their accuracy is compromised. This paper investigates the application of Extended Kalman Filtering techniques for estimating dynamic states in the state estimation process. The new formulated ďdynamic state estimationĒ includes true system dynamics reflected in differential equations, not like previously proposed ďdynamic state estimationĒ which only considers the time-variant snapshots based on steady state modeling. This new dynamic state estimation using Extended Kalman Filter has been successfully tested on a multi-machine system. Sensitivity studies with respect to noise levels, sampling rates, model errors, and parameter errors are presented as well to illustrate the robust performance of the developed dynamic state estimation process.

Huang, Zhenyu; Schneider, Kevin P.; Nieplocha, Jaroslaw; Zhou, Ning

2014-10-31T23:59:59.000Z

150

Current work in energy analysis  

SciTech Connect (OSTI)

This report describes the work performed at Berkeley Lab most recently. One of the Labs accomplishments is the publication of Scenarios of US Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the US. This analysis is described and played a key role in shaping the US position on climate change in the Kyoto Protocol negotiations. The Labs participation in the fundamental characterization of the climate change issue by the IPCC is described. Described also is a study of leaking electricity, which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of US residential electricity currently expended on standby losses. The 54 vignettes contained in the report summarize results of research activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national Energy Star{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China.

NONE

1998-03-01T23:59:59.000Z

151

Imagine the result [A Day in the Life of an  

E-Print Network [OSTI]

Assessment, Management & Remediation · Sustainability Services · Etc. #12;© 2011 ARCADIS20 April 20115 Health: · Well installations · Soil boring installations · Soil/rock core logging · Aquifer pump tests Field Day Soil Vapor Sampling #12;© 2011 ARCADIS20 April 201118 A Typical Field Day Collecting Soil

Militzer, Burkhard

152

LBID-2488, Rev 1 LBNL Monitor Day-to-  

E-Print Network [OSTI]

LBID-2488, Rev 1 LBNL Monitor Day-to- Day Work Activities Notification Conduct Investigation activities. 2. LBNL personnel, subcontractor, or guest creates or witnesses an adverse ES&H occurrence. 3 approve all final ORPS reports, including corrective actions. Figure 3.1. LBNL Occurrence Reporting

153

IMAGES IN EMBRYOLOGY............................................................................ Development of the human heart: days 1521  

E-Print Network [OSTI]

............................................................................ Development of the human heart: days 15­21 I n this series, three dimensional computer graphics are used to present the anatomical structures involved in the different stages of normal human heart development visit: www.virtual-heart- development.univ-rennes1.fr During the third week of gestation (days 15

Boyer, Edmond

154

Summary, Attendee Input, and Day 1 Wrap Up  

Broader source: Energy.gov [DOE]

Summary and wrap up of day 1 presentations and preview of day 2 by DOE Integrated Safety Management Co-champions Patricia R. Worthington, HSS Director, Office of Health and Safety; and and Ray J. Corey, Assistant Manager for Safety and Environment, DOE Richland Operations Office.

155

FIRST DAY SECTION TWO VIRGINIA BOARD OF BAR EXAMINERS  

E-Print Network [OSTI]

FIRST DAY SECTION TWO VIRGINIA BOARD OF BAR EXAMINERS Roanoke, Virginia - July 25, 2006 You MUST." Richard is still living. George has contracted to sell Tract 1 to Craig. Tract 2. Ten years ago, Cain holds, gave all required notices, and set the sale for 30 days from today. Tract 4. Ten years ago

Marsh, David

156

FIRST DAY SECTION TWO VIRGINIA BOARD OF BAR EXAMINERS  

E-Print Network [OSTI]

FIRST DAY SECTION TWO VIRGINIA BOARD OF BAR EXAMINERS Roanoke, Virginia ­ July 26, 2011 You MUST days from today. Tract 2. Ten years ago, Amelia conveyed Tract 2 to her children, Julia and Mary. Ten years ago, Carl conveyed Tract 4 by a deed reciting, "I convey Tract 4 to Sean and his heirs so

Marsh, David

157

WCROC Organic Dairy Day Tuesday, August 13, 2013  

E-Print Network [OSTI]

at 8008768636. Printed on recycled and recyclable paper with at least 10 percent postconsumer waste materialWCROC Organic Dairy Day Tuesday, August 13, 2013 West Central Research and Outreach Center. For More Information Contact: Brad Heins, 3205891711 or hein0106@umn.edu WCROC Organic Dairy Day

Blanchette, Robert A.

158

WCROC Organic Dairy Day Tuesday, August 13, 2013  

E-Print Network [OSTI]

-876-8636. Printed on recycled and recyclable paper with at least 10 percent postconsumer waste material. All rightsWCROC Organic Dairy Day Tuesday, August 13, 2013 West Central Research and Outreach Center,Morris, MN SEMINARS AND PASTURE TOURS ≠ 10AM TO 3PM WCROC Organic Dairy Day Tuesday, August 13, 2013 West

Blanchette, Robert A.

159

A Parametric Spectral Estimator for Faults Detection in Induction Machines  

E-Print Network [OSTI]

for fault diagnosis in electrical machines. Current spectral estimation is usually performed using classical and productivity of electrical drives. For electrical motors and generators, fault detection is usually performedA Parametric Spectral Estimator for Faults Detection in Induction Machines El Houssin El Bouchikhi

Boyer, Edmond

160

Remote estimation of carbon dioxide uptake by a Mediterranean forest  

E-Print Network [OSTI]

to assessing the global carbon budget in a context of climate change (Ciais et al., 2005; Boisvenue & RunningRemote estimation of carbon dioxide uptake by a Mediterranean forest M A R T I¬ī N F. G A R B U L of the ecology of global change. Current remote sensing methodologies for estimating gross primary productivity

Garbulsky, Martín

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Current Testbed Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FY 2014|Current Test Procedure

162

Current Transmission Rates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FY 2014|Current Test

163

Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

164

: Helmholtz machine estimation .  

E-Print Network [OSTI]

: Helmholtz machine density estimation . . : . . . (supervised learning) , (active learning) (query learning) [1, 3]. . (unsupervised learning), . , [5]. . Helmholtz machine , . Helmholtz machine : Helmholtz machine [2] . Helmholtz machine (generative network) (recognition network) . , , . Helmholtz machine (self

165

Operated device estimation framework  

E-Print Network [OSTI]

Protective device estimation is a challenging task because there are numerous protective devices present in a typical distribution system. Among various protective devices, auto-reclosers and fuses are the main overcurrent protection on distribution...

Rengarajan, Janarthanan

2009-05-15T23:59:59.000Z

166

Estimation of food consumption  

SciTech Connect (OSTI)

The research reported in this document was conducted as a part of the Hanford Environmental Dose Reconstruction (HEDR) Project. The objective of the HEDR Project is to estimate the radiation doses that people could have received from operations at the Hanford Site. Information required to estimate these doses includes estimates of the amounts of potentially contaminated foods that individuals in the region consumed during the study period. In that general framework, the objective of the Food Consumption Task was to develop a capability to provide information about the parameters of the distribution(s) of daily food consumption for representative groups in the population for selected years during the study period. This report describes the methods and data used to estimate food consumption and presents the results developed for Phase I of the HEDR Project.

Callaway, J.M. Jr.

1992-04-01T23:59:59.000Z

167

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

168

EXPLORATION Actual Estimate  

E-Print Network [OSTI]

FY 2015 FY 2016 FY 2017 FY 2013 President's Budget Request 3,821.2 3,712.8 3,932.8 4,076.5 4,076.5 4 Estimate Budget Authority (in $ millions) FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2013EXPLORATION EXP-1 Actual Estimate Budget Authority (in $ millions) FY 2011 FY 2012 FY 2013 FY 2014

169

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011  

SciTech Connect (OSTI)

This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

2013-06-21T23:59:59.000Z

170

Trends in Heating and Cooling Degree Days: Implications for Energy Demand Issues (released in AEO2008)  

Reports and Publications (EIA)

Weather-related energy use, in the form of heating, cooling, and ventilation, accounted for more than 40% of all delivered energy use in residential and commercial buildings in 2006. Given the relatively large amount of energy affected by ambient temperature in the buildings sector, the Energy Information Administration has reevaluated what it considers normal weather for purposes of projecting future energy use for heating, cooling, and ventilation. The Annual Energy Outlook 2008, estimates of normal heating and cooling degree-days are based on the population-weighted average for the 10-year period from 1997 through 2006.

2008-01-01T23:59:59.000Z

171

Performance estimates for personnel access control systems  

SciTech Connect (OSTI)

Current performance estimates for personnel access control systems use estimates of Type I and Type II verification errors. A system performance equation which addresses normal operation, the insider, and outside adversary attack is developed. Examination of this equation reveals the inadequacy of classical Type I and II error evaluations which require detailed knowledge of the adversary threat scenario for each specific installation. Consequently, new performance measures which are consistent with the performance equation and independent of the threat are developed as an aid in selecting personnel access control systems.

Bradley, R. G.

1980-10-01T23:59:59.000Z

172

Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

173

Ares I-X 30 Day ReportAres I-X 30 Day Report Bob Ess, Mission Manager  

E-Print Network [OSTI]

Ares I-X 30 Day ReportAres I-X 30 Day Report Bob Ess, Mission Manager Marshall Smith, SE&I Chief Bob Ess, Mission Manager Marshall Smith, SE&I Chief December 3, 2009December 3, 2009 www.nasa.gov #12

Waliser, Duane E.

174

Estimating Radiological Doses to Predators Foraging in a Low-Level Radioactive Waste Management Area  

SciTech Connect (OSTI)

Since 1957, Los Alamos National Laboratory has operated Area G as its low-level, solid radioactive waste management and disposal area. Although the waste management area is developed, plants, small mammals, and avian and mammalian predators still occupy the less disturbed and revegetated portions of the land. For almost a decade, we have monitored the concentrations of selected radionuclides in soils, plants, and small mammals at Area G. The radionuclides tritium, plutonium-238, and plutonium-239 are regularly found at levels above regional background in all three media. Based on radionuclide concentrations in mice collected from 1994 to 1999, we calculated doses to higher trophic levels (owl, hawk, kestrel, and coyote) that forage on the waste management area. These predators play important functions in the regional ecosystems and are an important part of local Native American traditional tales that identify the uniqueness of their culture. The estimated doses are compared to Department of Energy's interim limit of 0.1 rad/day for the protection of terrestrial wildlife. We used exposure parameters that were derived from the literature for each receptor, including Environmental Protection Agency's exposure factors handbook. Estimated doses to predators ranged from 9E-06 to 2E-04 rad/day, assuming that they forage entirely on the waste management area. These doses are greater than those calculated for predators foraging exclusively in reference areas, but are still well below the interim dose limit. We believe that these calculated doses represent upper-bound estimates of exposure for local predators because the larger predators forage over areas that are much greater than the 63-acre waste management area. Based on these results, we concluded that predators foraging on this area do not face a hazard from radiological exposure under current site conditions.

L.Soholt; G.Gonzales; P.Fresquez; K.Bennett; E.Lopez

2003-03-01T23:59:59.000Z

175

Oscillatory nonohomic current drive for maintaining a plasma current  

DOE Patents [OSTI]

Apparatus and methods are described for maintaining a plasma current with an oscillatory nonohmic current drive. Each cycle of operation has a generation period in which current driving energy is applied to the plasma, and a relaxation period in which current driving energy is removed. Plasma parameters, such as plasma temperature or plasma average ionic charge state, are modified during the generation period so as to oscillate plasma resistivity in synchronism with the application of current driving energy. The invention improves overall current drive efficiencies.

Fisch, N.J.

1984-01-01T23:59:59.000Z

176

Remembering the long day's journey to a historic machine's Christmas...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and ushered in more than a decade of record-setting experiments on the big PPPL machine. But that first step was hardly easy. The historic day began on Dec. 23, 1982, and...

177

Eawag GL search Theoretical Evolutionary Ecosystems Ecology Half day symposium  

E-Print Network [OSTI]

Eawag GL search Theoretical Evolutionary Ecosystems Ecology Half day symposium ,,Theoretical of natural communities #12;Eawag GL search Theoretical Evolutionary Ecosystems Ecology Abstracts Carlos data sets and theory in a flexible framework. #12;Eawag GL search Theoretical Evolutionary Ecosystems

Wehrli, Bernhard

178

2014 Advanced Grid Modeling Peer Review Presentations - Day One...  

Broader source: Energy.gov (indexed) [DOE]

- Day One Afternoon Session The Office of Electricity Delivery and Energy Reliability held a peer review of the Advanced Grid Modeling Program on June 17-18, 2014 in...

179

2012 Smart Grid Peer Review Presentations - Day 1 Morning Session...  

Broader source: Energy.gov (indexed) [DOE]

Morning Session 2012 Smart Grid Peer Review Presentations - Day 1 Morning Session The Office of Electricity Delivery and Energy Reliability held its bi-annual peer review of the...

180

The Preuss School UCSD Daily Bulletin B Day  

E-Print Network [OSTI]

like ASB Ball, college formals, etc. Register online at www.mysignup.com/freedress Dates: April 18th Graders: Tuesday, March 21st will be the first day in the new wheel class: 6th Grade Science (Rupert

Russell, Lynn

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Preuss School UCSD Daily Bulletin A Day  

E-Print Network [OSTI]

like ASB Ball, college formals, etc. Register online at www.mysignup.com/freedress Dates: April 18th: Tuesday, March 21st will be the first day in the new wheel class: 6th Grade Science (Rupert) moves

Russell, Lynn

182

Using waste wood as fuel saves $2000 per day  

SciTech Connect (OSTI)

Sawdust and wood residue replaced natural gas or number 2 fuel oil to fire 2 kilns at the Cherokee Brick Co. in Raleigh, NC, resulting in savings of $2000/day. Exhaust air from the kilns was sent directly back to a rotating dryer to dry the waste wood. The dried wood containing 8 to 12% moisture was supplied, around the clock, at a rate of 140 ton/day of dry material. (BLM)

Ragland, W. (Cherokee Brick Co., Raleigh, NC); Byrnes, D.

1981-11-01T23:59:59.000Z

183

Circulating current battery heater  

DOE Patents [OSTI]

A circuit for heating energy storage devices such as batteries is provided. The circuit includes a pair of switches connected in a half-bridge configuration. Unidirectional current conduction devices are connected in parallel with each switch. A series resonant element for storing energy is connected from the energy storage device to the pair of switches. An energy storage device for intermediate storage of energy is connected in a loop with the series resonant element and one of the switches. The energy storage device which is being heated is connected in a loop with the series resonant element and the other switch. Energy from the heated energy storage device is transferred to the switched network and then recirculated back to the battery. The flow of energy through the battery causes internal power dissipation due to electrical to chemical conversion inefficiencies. The dissipated power causes the internal temperature of the battery to increase. Higher internal temperatures expand the cold temperature operating range and energy capacity utilization of the battery. As disclosed, either fixed frequency or variable frequency modulation schemes may be used to control the network.

Ashtiani, Cyrus N. (West Bloomfield, MI); Stuart, Thomas A. (Toledo, OH)

2001-01-01T23:59:59.000Z

184

Quantum limits to estimation of photon deformation  

E-Print Network [OSTI]

We address potential deviations of radiation field from the bosonic behaviour and employ local quantum estimation theory to evaluate the ultimate bounds to precision in the estimation of these deviations using quantum-limited measurements on optical signals. We consider different classes of boson deformation and found that intensity measurement on coherent or thermal states would be suitable for their detection making, at least in principle, tests of boson deformation feasible with current quantum optical technology. On the other hand, we found that the quantum signal-to-noise ratio (QSNR) is vanishing with the deformation itself for all the considered classes of deformations and probe signals, thus making any estimation procedure of photon deformation inherently inefficient. A partial way out is provided by the polynomial dependence of the QSNR on the average number of photon, which suggests that, in principle, it would be possible to detect deformation by intensity measurements on high-energy thermal states.

Giovanni De Cillis; Matteo G. A. Paris

2014-07-08T23:59:59.000Z

185

The fundamental properties of current controlled current source amplifiers  

E-Print Network [OSTI]

The thesis studies the fundamental properties of current controlled current source (CCCS) amplifiers for use in a wide bandwidth voltage gain application. Theoretical expressions are derived which describe the p'erformance of the CCCS in terms of circuit... of this research was to conduct a theoretical and experimental study of the fundamental properties of Current Controlled Current Source (CCCS) amplifiers. Of particular interest was the bandwidth independence on the closed loop voltage gain of the CCCS used...

Terry, Michael Buford

1978-01-01T23:59:59.000Z

186

Stray current interference control for HVDC earth currents  

SciTech Connect (OSTI)

High-voltage direct current (HVDC) transmission lines exist around the world, with several in the US. When one conductor must be taken out of operation (in case of emergency), the earth may be used as an alternate conductor. The earth current may be accumulated on and discharged from underground metallic structures that cross the voltage gradient created by the current. Test results on two lines showed that stray current interference is not a major problem if mitigated properly.

Fitzgerald, J.H. III [PSG Corrosion Engineering/Corrpro Cos., Detroit, MI (United States); Kroon, D.H. [Corrpro Companies Inc., Spring, TX (United States)

1995-06-01T23:59:59.000Z

187

MELE: Maximum Entropy Leuven Estimators  

E-Print Network [OSTI]

of the Generalized Maximum Entropy Estimator of the Generaland Douglas Miller, Maximum Entropy Econometrics, Wiley andCalifornia Davis MELE: Maximum Entropy Leuven Estimators by

Paris, Quirino

2001-01-01T23:59:59.000Z

188

Estimating the Market Penetration of Residential Cool Storage Technology Using Economic Cost Modeling  

E-Print Network [OSTI]

This study estimated the market penetration for residential cool storage technology using economic cost modeling. Residential cool storage units produce and store chill during off-peak periods of the day to be used during times of peak electric...

Weijo, R. O.; and Brown, D. R.

1988-01-01T23:59:59.000Z

189

Errors in Estimating River Discharge from Remote Sensing based on Manning's Equation  

E-Print Network [OSTI]

¬į inclination; all rivers, lakes, reservoirs observed at least twice every 22 days. Will measure reach (2008) estimated errors in width resulting from water coherence time effects (due to wind and turbulence

Washington at Seattle, University of

190

Conversion of pure spin current to charge current in amorphous bismuth  

SciTech Connect (OSTI)

Spin Hall angle and spin diffusion length in amorphous bismuth (Bi) are investigated by using conversion of a pure spin current to a charge current in a spin pumping technique. In Bi/Ni{sub 80}Fe{sub 20}/Si(100) sample, a clear direct current (DC) electromotive force due to the inverse spin Hall effect of the Bi layer is observed at room temperature under a ferromagnetic resonance condition of the Ni{sub 80}Fe{sub 20} layer. From the Bi thickness dependence of the DC electromotive force, the spin Hall angle and the spin diffusion length of the amorphous Bi film are estimated to be 0.02 and 8?nm, respectively.

Emoto, H.; Ando, Y.; Shinjo, T.; Shiraishi, M., E-mail: shiraishi@ee.es.osaka-u.ac.jp [Graduate School of Engineering Science, Osaka University, Osaka 560-8531 (Japan); Shikoh, E. [Graduate School of Engineering, Osaka City University, Osaka 558-8585 (Japan); Fuseya, Y. [Department of Applied Physics and Chemistry, The University of Electro-Communications, Tokyo 182-8585 (Japan)

2014-05-07T23:59:59.000Z

191

External Dose Estimates from  

E-Print Network [OSTI]

; - calculated separately for the most important radionuclides produced in nuclear weapons tests. Those would averages for all tests. 2. Provide a list of references regarding: (1) the history of nuclear weapons to the Population of the Continental U.S. from Nevada Weapons Tests and Estimates of Deposition Density

192

Radiation Dose Estimates from  

E-Print Network [OSTI]

Summary: Radiation Dose Estimates from Hanford Radioactive Material Releases to the Air and the Columbia River April 21,1994 TheTechnid Steering Panel of the Hanford - Environmental Dose Reconstruction than 40years, the U.S. Government made plutonium for nuclear weapons at the Hanford

193

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

194

Impact of PMU Technology in State Estimation  

SciTech Connect (OSTI)

Recent blackouts and the need to manage larger and larger power systems closer to their stability limits are driving electricity utilities to deploy synchronized phasor measurements (PMU) for wide area monitoring and control. At the same time, modern TSOs need accurate, fast and reliable estimation of their networks' real-time conditions. State Estimator (SE), a fundamental function in dispatching control centers, is expected to perform reliably around the clock since it provides the foundation for subsequent critical security analyses, market revenue calculations, etc. PMU technology provides accurate, satellite-synchronized measurements of both magnitude and angle, which naturally fit in the SE algorithm and enhance its robustness and the quality of the results. This paper presents current results of ongoing experiences with electric utilities on the usage of PMU data in state estimation. It focuses on practical implementation aspects, such as data communication and interfacing to the control center EMS, metrics for evaluation of State Estimator results and improvements in state estimation behavior and results thanks to PMU data.

Avila-Rosales, Rene [AREVA T& D; Rice, Mark [AREVA T& D; Lopez, Rafael [AREVA T& D; Beard, Lisa [Tennessee Valley Authority (TVA); Mathur, Tanya [Tennessee Valley Authority (TVA); Galvan, Floyd [Entergy; Gupta, Vinit [Entergy; James, Lambert [Manitoba Hydro; Graffy, James [Bonneville Power Administration (BPA); Papic, Milorad [Idaho Power Company

2008-01-01T23:59:59.000Z

195

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

196

Regional variations of days of autonomy for solar energy applications  

SciTech Connect (OSTI)

A problem faced by designers of stand-alone solar installations is the sizing of the collector area and storage capacity. From a curve of the minimum possible insolation over any period of days for a given site, a functional relationship between the collector-area and storage-capacity that provides a 0% probability of not meeting load (PNML) can be derived. This permits evaluating the regional variations in days-of-autonomy required to provide 100% reliability. Such variations are shown for Texas based on recent insolation data.

Grindle, E. II; Vliet, G.C.

1999-07-01T23:59:59.000Z

197

Celebrate Earth Day with Secretary Chu | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth Day with Secretary Chu Celebrate Earth Day with

198

Current Awards | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Stewardship Science Academic Alliances Program Current Awards Current Awards Stewardship Science Academic Alliances (SSAA) Program Current Awards Under Construction...

199

Current Awards | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

National Laser User Facilities Program Current Awards Current Awards National Laser Users' Facility Grant Program Current Awards Under Construction...

200

Los Alamos PC estimating system  

SciTech Connect (OSTI)

The Los Alamos Cost Estimating System (QUEST) is being converted to run on IBM personal computers. This very extensive estimating system is capable of supporting cost estimators from many different and varied fields. QUEST does not dictate any fixed method for estimating. QUEST supports many styles and levels of detail estimating. QUEST can be used with or without data bases. This system allows the estimator to provide reports based on levels of detail defined by combining work breakdown structures. QUEST provides a set of tools for doing any type of estimate without forcing the estimator to use any given method. The level of detail in the estimate can be mixed based on the amount of information known about different parts of the project. The system can support many different data bases simultaneously. Estimators can modify any cost in any data base.

Stutz, R.A.; Lemon, G.D.

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Level and length of cyclic solar activity during the Maunder minimum as deduced from the active day statistics  

E-Print Network [OSTI]

The Maunder minimum (MM) of greatly reduced solar activity took place in 1645-1715, but the exact level of sunspot activity is uncertain as based, to a large extent, on historical generic statements of the absence of spots on the Sun. Here we aim, using a conservative approach, to assess the level and length of solar cycle during the Maunder minimum, on the basis of direct historical records by astronomers of that time. A database of the active and inactive days (days with and without recorded sunspots on the solar disc respectively) is constructed for three models of different levels of conservatism (loose ML, optimum MO and strict MS models) regarding generic no-spot records. We have used the active day fraction to estimate the group sunspot number during the MM. A clear cyclic variability is found throughout the MM with peaks at around 1655--1657, 1675, 1684 and 1705, and possibly 1666, with the active day fraction not exceeding 0.2, 0.3 or 0.4 during the core MM, for the three models. Estimated sunspot nu...

Vaquero, J M; Usoskin, I G; Carrasco, V M S; Gallego, M C

2015-01-01T23:59:59.000Z

202

AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)  

SciTech Connect (OSTI)

Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

FERRIES SR; KLINK KL; OSTAPKOWICZ B

2012-01-30T23:59:59.000Z

203

Estimating radiogenic cancer risks  

SciTech Connect (OSTI)

This document presents a revised methodology for EPA`s estimation of cancer risks due to low-LET radiation exposures in light of information that has become available since the publication of BIER III, especially new information on the Japanese atomic bomb survivors. For most cancer sites, the risk model is one in which the age-specific relative risk coefficients are obtained by taking the geometric mean of coefficients derived from the atomic bomb survivor data employing two different methods for transporting risks from Japan to the U.S. (multiplicative and NIH projection methods). Using 1980 U.S. vital statistics, the risk models are applied to estimate organ-specific risks, per unit dose, for a stationary population.

NONE

1994-06-01T23:59:59.000Z

204

Estimating Corn Grain Yields  

E-Print Network [OSTI]

can collect samples from a corn field and use this data to calculate the yield estimate. An interactive grain yield calculator is provided in the Appendix of the pdf version of this publication. The calculator is also located in the publication.... Plan and prepare for sample and data collection. 2. Collect field samples and record data. 3. Analyze the data using the interactive grain yield calculator in the Appendix. Plan and prepare for sample and data collection Predetermine sample locations...

Blumenthal, Jurg M.; Thompson, Wayne

2009-06-12T23:59:59.000Z

205

Comparing Local and Global Software Effort Estimation Models Reflections on a Systematic Review  

E-Print Network [OSTI]

protocols. Keywords: D.2.9.b Cost estimation, project effort prediction, systematic review, empirical of practice in the form of benchmarking, assessment of current activities, estimation of future tasksComparing Local and Global Software Effort Estimation Models ≠ Reflections on a Systematic Review

206

Fault current limiter and alternating current circuit breaker  

DOE Patents [OSTI]

A solid-state circuit breaker and current limiter are disclosed for a load served by an alternating current source having a source impedance, the solid-state circuit breaker and current limiter comprising a thyristor bridge interposed between the alternating current source and the load, the thyristor bridge having four thyristor legs and four nodes, with a first node connected to the alternating current source, and a second node connected to the load. A coil is connected from a third node to a fourth node, the coil having an impedance of a value calculated to limit the current flowing therethrough to a predetermined value. Control means are connected to the thyristor legs for limiting the alternating current flow to the load under fault conditions to a predetermined level, and for gating the thyristor bridge under fault conditions to quickly reduce alternating current flowing therethrough to zero and thereafter to maintain the thyristor bridge in an electrically open condition preventing the alternating current from flowing therethrough for a predetermined period of time. 9 figs.

Boenig, H.J.

1998-03-10T23:59:59.000Z

207

Take Our Daughters and Sons to Work Day  

Broader source: Energy.gov [DOE]

2014 is the 21st anniversary of the annual opportunity to immerse your children and relatives in the daily work of the Energy Department. On Thursday, April 24, bring your daughters and sons to the office with you for a day of shadowing your work, showing off your office, testing out the cafeteria, and meeting your coworkers. Check with your office for structured activities.

208

Day 1 -September 10 Green Event and `Starling magic'  

E-Print Network [OSTI]

Day 1 - September 10 Green Event and `Starling magic' 12:00 ­ 18:30 Welcome and check Venue: Fællessalen, Christiansborg Palace, Rigs- dagsgården 08:00 Registration and coffee/tea 09 and Sweden Lari Pitkä-Kangas, Deputy Mayor, Urban Ecology (Green Party) City of Malmö, Sweden 09:40 Children

Edinburgh, University of

209

OSU Agricultural Composting Workshop Day 1 Title Description  

E-Print Network [OSTI]

OSU Agricultural Composting Workshop Day 1 Title Description 8:30 Registration 9:00 Welcome; provide handouts; form work groups 9:30 The composting process Stages of composting; composting methods; composting parameters (temperature, moisture, C/N ratio, pH, micro-organisms, etc.); what should I compost

Tullos, Desiree

210

American Cranberry Growers Association 2011 Summer Field Day  

E-Print Network [OSTI]

American Cranberry Growers Association 2011 Summer Field Day Thursday, August 18, 2011 Rutgers University P.E. Marucci Center for Blueberry & Cranberry Research & Extension, Chatsworth, NJ Parking will be available at the Center's shop (across cranberry bogs). Transportation for tours will be provided

Chen, Kuang-Yu

211

Waisman Center Day with the Experts: Down Syndrome  

E-Print Network [OSTI]

Waisman Center Day with the Experts: Down Syndrome 4th Annual Saturday, March 22, 2014 | 9:00 a on Adults with Down Syndrome Marsha Mailick, PhD, Director, Waisman Center This presentation will report findings from a 22-year study of 75 adults with Down syndrome and their families. We found that when

Wisconsin at Madison, University of

212

Consulting Day Report 2008 Center for Nonprofit Strategy and Management  

E-Print Network [OSTI]

Consulting Day Report 2008 Center for Nonprofit Strategy and Management School of Public affairs Baruch College City University of New York 2008 #12;Center for Nonprofit Strategy and Management Baruch follow. #12;Center for Nonprofit Strategy and Management Baruch College School of Public Affairs 3

Rosen, Jay

213

and Co-Host Riverside Electric Vehicle Day  

E-Print Network [OSTI]

and Co-Host Riverside Electric Vehicle Day Where: UC Riverside | CE-CERT, 1084 Columbia Ave, 92507 renewable sourc- es, efficiently use electric transporta- tion through advanced vehicles and im- prove our million electric vehi- cles on California's roads by 2023 and to ensure that low-income communities, which

Mills, Allen P.

214

Spain and the Bologna Plan: A Modern Day  

E-Print Network [OSTI]

Spain and the Bologna Plan: A Modern Day Controversy By: Danielle Vasan Communication of Privatization #12;Higher Education in Spain before Bologna 1983: Three-cycled degree system Diplomado (3-5 years) Licenciado (1-2 years) Doctor (3 years & Thesis) #12;Higher Education in Spain Today Graduado

New Hampshire, University of

215

The Preuss School UCSD Daily Bulletin A Day  

E-Print Network [OSTI]

is National Poetry Month! Today is the last day, but here's a poem to help you find the poet in yourself. Keep reading, dreaming, and writing poetry! (4/30 ≠Ms. Gabay) A New Poet by Linda Pastan Finding a new poet

Russell, Lynn

216

Essentials of Energy Key concepts for the day  

E-Print Network [OSTI]

Essentials of Energy 4/14/05 Key concepts for the day Markets monopoly Substitution volatility Energy intensity Levelized costs externalities I. Market essentials Are there working energy markets · international geo-political issues Speculation Long lead times for development so supply is not very responsive

217

The College of Optics & Photonics 1 Industrial Affiliates Day  

E-Print Network [OSTI]

3/7/14 1 CREOL The College of Optics & Photonics 1 Industrial Affiliates Day 2014 Symposium Advances in Optics & Photonics CREOLThe College of Optics and Photonics CREOL The College of Optics & Photonics 2 MJ Soileau V.P. for Research & Commercialization Professor of Optics, ECE & Physics Founder

Van Stryland, Eric

218

The College of Optics & Photonics Industrial Affiliates Day  

E-Print Network [OSTI]

CREOL The College of Optics & Photonics Industrial Affiliates Day 2011 Symposium on FAR IR & THZ Photonics CREOLThe College of Optics and Photonics #12;CREOL The College of Optics & Photonics Studentofthe characterization Dimitrios Mandridis Graduate Student CREOL,TheCollegeofOptics Photonics 2:05Walktothe

Van Stryland, Eric

219

2008 TEAM BUILDING DAY For the teams of the  

E-Print Network [OSTI]

2008 TEAM BUILDING DAY For the teams of the DST/NRF CENTRE OF EXCELLENCE IN TREE HEALTH BIOTECHNOLOGY (CTHB) AND THE TREE PROTECTION COOPERATIVE PROGRAMME (TPCP) AT FABI Prepared by James Mehl, administrative and technical personnel, research and postdoctoral fellows, and postgraduate students (MSc and Ph

220

Summary, Attendee Input, and Final Day 2 Wrap up  

Broader source: Energy.gov [DOE]

Summary and wrap up by DOE Integrated Safety Management Co-champions Patricia R. Worthington, HSS Director, Office of Health and Safety; and and Ray J. Corey, Assistant Manager for Safety and Environment, DOE Richland Operations Office of day 2 presentations and discussions.

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Office of Evaluation and Testing Test Day Tips  

E-Print Network [OSTI]

Office of Evaluation and Testing Test Day Tips Get plenty of rest the night before the test. The best thing to do the evening before the test is to get a good night's sleep. You've covered the content and you've perfected the skills. Now it's time to get in test mode -- calm, rested, confident, and ready

Brinkmann, Peter

222

FIRST DAY SECTION ONE VIRGINIA BOARD OF BAR EXAMINERS  

E-Print Network [OSTI]

FIRST DAY SECTION ONE VIRGINIA BOARD OF BAR EXAMINERS Roanoke, Virginia -July 27, 2004 Write your's sister, Gladys, who lived in Culpeper, Virginia. In 1994,when Cameron was ten years old, Izzy wrote her fully. * * * * * #12;SECTION ONE PAGE 2 2. Stan is an attorney practicing criminal law in Roanoke

Marsh, David

223

Security Automation Developer Days March 22-25, 2011  

E-Print Network [OSTI]

Security Automation Developer Days March 22-25, 2011 Portrait Room The National Institute Reporting Format (ARF) efforts. 1:00 ­ 2:50 Adv. Tailoring and Automated Profile Selection Charles Schmidt tailoring procedures, and structures that could support automated selection of profiles. This discussion

Magee, Joseph W.

224

Energy Productivity Via Time-of-Day Rates  

E-Print Network [OSTI]

-intensive industrial customers to lower their cost of power while at the same time improving the load characteristics of their utility supplier. This paper examines the present state of time-of-day rates and discusses steps that Air Products is taking to maximize...

Michael, R. S.

1984-01-01T23:59:59.000Z

225

45-Day Language Hearing Agenda Building Energy Efficiency Standards  

E-Print Network [OSTI]

Shirakh 09:15 AM Revisions to Sections 10-101 ≠ 10-114 ≠ Energy Building Regulations, All Occupancies Gary45-Day Language Hearing Agenda Building Energy Efficiency Standards Revisions for Residential for Solar Ready Buildings ≠ All Occupancies Patrick Saxton 10:35 AM Revisions to Sections 150

226

ENGINEERS' DAY 2011 ACTIVITIES 1800 Engineering Hall, 1415 Engineering Drive  

E-Print Network [OSTI]

, Operations Support Exelon Nuclear Warrenville, Illinois Brian J. Rauch Vice President, Engineering John DeereENGINEERS' DAY 2011 ACTIVITIES 1800 Engineering Hall, 1415 Engineering Drive 5:30 SOCIAL HOUR · Distinguished Achievement Awards · Early-Career Achievement Award · College of Engineering faculty and staff

Sheridan, Jennifer

227

Degree Day Calculations Dr. Nikki Rothwell, District Fruit IPM Educator  

E-Print Network [OSTI]

. For example, if the min/max thermometer indicates a low of 45 degrees F and a high of 75 degrees F F, then 10 degree days would have accumulated. Check your thermometer and make this calculation each toward your target number. Minimum and maximum temperatures should be recorded from a Min/Max thermometer

228

Fizeau interferometer for measurement of plasma electron current  

SciTech Connect (OSTI)

A high-resolution, vertically viewing far-infrared polarimeter-interferometer system is currently used on the Madison symmetric torus (MST) reversed-field pinch (RFP) to measure the plasma electron density and toroidal current density via Faraday rotation. In this article, we propose a scheme to measure the well-known Fizeau effect, whereby through modest modification of the existing apparatus, the line-integrated poloidal current density can also be directly measured. This parameter is important, since the RFP toroidal magnetic field is largely determined by currents flowing within the plasma. The Fizeau effect is a phase shift of an electromagnetic wave associated with movement of a dielectric medium. This motion can be related directly to the plasma electron current. Determining the Fizeau effect involves measurement of the phase shift between two collinear, orthogonally polarized, counterpropagating laser beams. Estimates indicate a phase shift of {approx}2 deg. is expected for typical MST parameters, well within the existing system resolution.

Brower, D.L.; Ding, W.X.; Deng, B.H.; Mahdavi, M.A.; Mirnov, V.; Prager, S.C. [Electrical Engineering Department, University of California, Los Angeles, Los Angeles, California 90095 (United States); General Atomics, San Diego, California 92121 (United States); Physics Department, University of Wisconsin-Madison, Madison, Wisconsin 53706 (United States)

2004-10-01T23:59:59.000Z

229

Ionization tube simmer current circuit  

DOE Patents [OSTI]

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current.

Steinkraus, Jr., Robert F. (Livermore, CA)

1994-01-01T23:59:59.000Z

230

Ionization tube simmer current circuit  

DOE Patents [OSTI]

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current. 6 figures.

Steinkraus, R.F. Jr.

1994-12-13T23:59:59.000Z

231

Particle Detector / Beam Current Transformer  

E-Print Network [OSTI]

Particle Detector / Beam Current Transformer Analysis December 8, 2009 Harold G. Kirk #12;ShotSignal,A.U. Proton Bunch Number Beam Current Transformer - 17011 0 2 4 6 8 0 2 4 6 8 10 12 14 16 18 20 Integrated Transformer Pump 187829 (au) Probe 196504 (au) Ratios: Beam Current 1.046 SF 1.019 2.9% difference #12;Shot

McDonald, Kirk

232

SPACE TECHNOLOGY Actual Estimate  

E-Print Network [OSTI]

SPACE TECHNOLOGY TECH-1 Actual Estimate Budget Authority (in $ millions) FY 2011 FY 2012 FY 2013 FY.6 29.5 29.5 29.5 29.5 29.5 29.5 Crosscutting Space Tech Development 120.4 187.7 293.8 272.1 266.6 259.7 247.0 Exploration Technology Development 144.6 189.9 202.0 215.5 215.7 214.5 216.5 Notional SPACE

233

John Day Watershed Restoration Projects, annual report 2003.  

SciTech Connect (OSTI)

The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.

Brown, Linda (Confederated Tribes of the Warm Springs Reservation of Oregon, John Day Basin Office, John Day, OR)

2004-01-01T23:59:59.000Z

234

Anomalous-viscosity current drive  

DOE Patents [OSTI]

The present invention relates to a method and apparatus for maintaining a steady-state current for magnetically confining the plasma in a toroidal magnetic confinement device using anomalous viscosity current drive. A second aspect of this invention relates to an apparatus and method for the start-up of a magnetically confined toroidal plasma.

Stix, T.H.; Ono, M.

1986-04-25T23:59:59.000Z

235

Museum Day at Bradbury Science Museum Sept. 24  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challengeMultiscale Subsurface Biogeochemical Modeling MultiscaleMuseum Day

236

The modern day discount house as a separate retail establishment  

E-Print Network [OSTI]

Opinions of Authorities In Retailing Analysis of Authorities' Conclusions Author's Conclusions Settling of Retail Margins Trend Toward Larger Stores Elimination of "List Price" and "Fair Trade" Every Large Retailer a Type of Department St, ore... Department Store X, 1955 22 Gross Margin, Old-Line Retailers Versus Masters, Inc. , 1954 Listed Discounts in Different Departments oi' Better Business Buying, Inc. , Berkeley, cali fornia--1955 25 27 THE MODERN DAY DISCOUNT HOUSE AS A SEPARATE RETAIL...

Broussard, Carroll James

2012-06-07T23:59:59.000Z

237

Training days: TWRI coordinates water resources training programs  

E-Print Network [OSTI]

tx H2O | pg. 2 Training days TWRI coordinates water resources training programs | pg. 2 Story by Ric Jensen tx H2O | pg. 3 H elping water professionals learn how to manage water resources is the goal of new training programs coordinated... (APEX), Water Rights Analysis Package (WRAP), and EPANET. In other training programs, the institute is working with Texas AgriLife Research, Texas AgriLife Extension Service, state and federal agencies, and various universities to conduct training...

Jensen, Ric

2008-01-01T23:59:59.000Z

238

Prepared by DMS 2/09 STUDENT LEAVING CURRENT ADVISOR LAB  

E-Print Network [OSTI]

Prepared by DMS 2/09 STUDENT LEAVING CURRENT ADVISOR LAB Student Name: Program: G-Year: Current Advisor: Last Day In Lab: Reason for leaving lab: 1. Program Administrator provides form to student of rotation should be a maximum of six weeks in duration. Dissertation advisor support should start

Datta, Sandeep Robert

239

Revised by VCS 2/10 STUDENT LEAVING CURRENT ADVISOR LAB  

E-Print Network [OSTI]

Revised by VCS 2/10 STUDENT LEAVING CURRENT ADVISOR LAB Student Name: Program: G-Year: Current Advisor: Last Day In Lab: Reason for leaving lab: 1. Program Administrator provides form to student (for DMS Use) Note to Students and Rotation Advisor: Students can rotate only in labs with faculty who

Bulyk, Martha L.

240

Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review  

SciTech Connect (OSTI)

This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

Ruth, M.

2011-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

A BIM-based system for demolition and renovation waste estimation and planning  

SciTech Connect (OSTI)

Highlights: ? We developed a waste estimation system leveraging the BIM technology. ? The system can calculate waste disposal charging fee and pick-up truck demand. ? We presented an example scenario demonstrating this system. ? Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

Cheng, Jack C.P., E-mail: cejcheng@ust.hk [Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology (Hong Kong); Ma, Lauren Y.H., E-mail: yingzi@ust.hk [Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology (Hong Kong)

2013-06-15T23:59:59.000Z

242

Photogrammetry and Laser Imagery Tests for Tank Waste Volume Estimates: Summary Report  

SciTech Connect (OSTI)

Feasibility tests were conducted using photogrammetry and laser technologies to estimate the volume of waste in a tank. These technologies were compared with video Camera/CAD Modeling System (CCMS) estimates; the current method used for post-retrieval waste volume estimates. This report summarizes test results and presents recommendations for further development and deployment of technologies to provide more accurate and faster waste volume estimates in support of tank retrieval and closure.

Field, Jim G. [Washington River Protection Solutions, LLC, Richland, WA (United States)

2013-03-27T23:59:59.000Z

243

Energy Expenditure Estimation DEMO Application  

E-Print Network [OSTI]

and against the SenseWear, a dedicated commercial product for energy expenditure estimation. Keywords: humanEnergy Expenditure Estimation DEMO Application Bozidara Cvetkoviīc1,2 , Simon Kozina1,2 , Bostjan://www.mps.si Abstract. The paper presents two prototypes for the estimation of hu- man energy expenditure during normal

Lu?trek, Mitja

244

Current  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReport 2009Site | Department ofHighly31, 2015 |Dollars in

245

Current:  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r.x-L* d!9Document/Qwner

246

Current:  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r.x-L*

247

Current  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on &gamma;-Al2O3.WinterCrystalApplicationsCumulusMars

248

Supplemental Material to Cryogenic Roadmap Current Commercial Technology  

E-Print Network [OSTI]

Supplemental Material to Cryogenic Roadmap Current Commercial Technology Refrigeration Approximate,500 Brayton Turbine $800,000 $69.57 167 14.5 18.94% Liquid Air Plants Cosmodyne GF-1 80 N2 4 T/Day 8,400 Brayton Turbine $700,000 $83.33 372 44.3 6.21% Cosmodyne Aspen 1000 80 N2 1000 nM3 /Hr 64,969 Brayton

249

Controlling electrode gap during vacuum arc remelting at low melting current  

DOE Patents [OSTI]

An apparatus and method are disclosed for controlling electrode gap in a vacuum arc remelting furnace, particularly at low melting currents. Spectrographic analysis is performed of the metal vapor plasma, from which estimates of electrode gap are derived. 5 figs.

Williamson, R.L.; Zanner, F.J.; Grose, S.M.

1997-04-15T23:59:59.000Z

250

Controlling electrode gap during vacuum arc remelting at low melting current  

DOE Patents [OSTI]

An apparatus and method for controlling electrode gap in a vacuum arc remelting furnace, particularly at low melting currents. Spectrographic analysis is performed of the metal vapor plasma, from which estimates of electrode gap are derived.

Williamson, Rodney L. (Albuquerque, NM); Zanner, Frank J. (Sandia Park, NM); Grose, Stephen M. (Glenwood, WV)

1997-01-01T23:59:59.000Z

251

Passive fault current limiting device  

DOE Patents [OSTI]

A passive current limiting device and isolator is particularly adapted for use at high power levels for limiting excessive currents in a circuit in a fault condition such as an electrical short. The current limiting device comprises a magnetic core wound with two magnetically opposed, parallel connected coils of copper, a high temperature superconductor or other electrically conducting material, and a fault element connected in series with one of the coils. Under normal operating conditions, the magnetic flux density produced by the two coils cancel each other. Under a fault condition, the fault element is triggered to cause an imbalance in the magnetic flux density between the two coils which results in an increase in the impedance in the coils. While the fault element may be a separate current limiter, switch, fuse, bimetal strip or the like, it preferably is a superconductor current limiter conducting one-half of the current load compared to the same limiter wired to carry the total current of the circuit. The major voltage during a fault condition is in the coils wound on the common core in a preferred embodiment. 6 figs.

Evans, D.J.; Cha, Y.S.

1999-04-06T23:59:59.000Z

252

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

253

Current balancing for battery strings  

DOE Patents [OSTI]

A battery plant is described which features magnetic circuit means for balancing the electrical current flow through a pluraliircuitbattery strings which are connected electrically in parallel. The magnetic circuit means is associated with the battery strings such that the conductors carrying the electrical current flow through each of the battery strings pass through the magnetic circuit means in directions which cause the electromagnetic fields of at least one predetermined pair of the conductors to oppose each other. In an alternative embodiment, a low voltage converter is associated with each of the battery strings for balancing the electrical current flow through the battery strings.

Galloway, James H. (New Baltimore, MI)

1985-01-01T23:59:59.000Z

254

Methodology for reconstruction of historical food consumption estimates  

SciTech Connect (OSTI)

This report was written to provide the food consumption methodology to be used in the Hanford Environmental Dose Reconstruction (HDER) Project beyond Phase I (which ended in July 1990). In Phase I (Callaway 1992), baseline food consumption estimates (grams per day) for 10 primary food types in the original 10-county study region were derived from the 1977--1978 National Food Consumption Survey (USDA 1983). The baseline estimates were multiplied by the 1945:1977 ratios to produce consumption estimates for 1945. This ratio backcasting method used in Phase I to project consumption estimates from 1977 back to 1945 will be refined using additional USDA data to improve and document the acceptability of the ratios for deriving backcast consumption estimates. The number of food types and population groups will be expanded to provide more disaggregated estimates of food consumption. Food consumption estimates will be developed for 1945, 1951, and 1957. A database of individual diets will be created from which daily diets will be randomly selected for use in the dose model to calculate doses for reference individuals.

Anderson, D.M.

1992-05-01T23:59:59.000Z

255

Gravity Currents in Aquatic Canopies  

E-Print Network [OSTI]

A lock exchange experiment is used to investigate the propagation of gravity currents through a random array of rigid, emergent cylinders which represents a canopy of aquatic plants. As canopy drag increases, the propagating ...

Tanino, Yukie

256

Inverter Using Current Source Topology  

Broader source: Energy.gov (indexed) [DOE]

of the new current-fed Trans-ZSI with wider motoring operation range V in 100 V, transformer turns ratio2 * Comparison of voltage boost ratio vs. duty ratio D A New...

257

Saving for dry days: Aquifer storage and recovery may help  

E-Print Network [OSTI]

tx H2O | pg. 2 Saving for dry days Story by Kathy Wythe tx H2O | pg. 3 Aquifer storage and recovery may help With reoccurring droughts and growing population, Texas will always be looking for better ways to save or use water. Some water... suppliers in Texas are turning to aquifer storage and recovery. During the dry summer of 2008, the San Antonio Water System (SAWS) had enough assets in its ?bank? (of water) to make with- drawals to meet the needs of its customers. The water bank...

Wythe, Kathy

2008-01-01T23:59:59.000Z

258

Probability analysis of dry-day sequences in Texas  

E-Print Network [OSTI]

0. d 0. 5 0. 4 0. 3 0. 2 0. 1 0 20 40 d0 80 100 120 140 140 180 200 220 240 240 280 300 320 340 340 JULIAN DATE Fig, 7. Three-cycle maximum and minimum probabilities for Brownsville, Texas. 1. 0 m I a O 0. 9 0. 8 0. 7 0. d 0. 8 0...PROBABILITY ANALYSIS OF DRY-DAY SEQUENCES IN TEXAS A I'hesis by ROBERT SAMES MILNE Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE DECEMBER 1971 Major...

Milne, Robert James

1971-01-01T23:59:59.000Z

259

Early Days of Coal Research | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ ContractConsumerofof Energy EX33Early Days

260

Property:Cost(per day) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyoCoolingTowerWaterUseSummerConsumed Jump to: navigation,Cost(per day) Jump to:

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

12 Days of Energy Savings | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South Valley Responsible DOEQA: NA Root CauseDepartment0,000thhe 201112 Days of

262

Geothermal: Sponsored by OSTI -- IGPPS Days Program Review Administrative  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinan antagonist Journal Article: Crystal structureComposite--FORRemarks IGPPS Days Program Review

263

Current sheets and pressure anisotropy in the reconnection exhaust  

SciTech Connect (OSTI)

A particle-in-cell simulation shows that the exhaust during anti-parallel reconnection in the collisionless regime contains a current sheet extending 100 inertial lengths from the X line. The current sheet is supported by electron pressure anisotropy near the X line and ion anisotropy farther downstream. Field-aligned electron currents flowing outside the magnetic separatrices feed the exhaust current sheet and generate the out-of-plane, or Hall, magnetic field. Existing models based on different mechanisms for each particle species provide good estimates for the levels of pressure anisotropy. The ion anisotropy, which is strong enough to reach the firehose instability threshold, is also important for overall force balance. It reduces the outflow speed of the plasma.

Le, A.; Karimabadi, H.; Roytershteyn, V. [SciberQuest, Inc., Del Mar, California 92014 (United States)] [SciberQuest, Inc., Del Mar, California 92014 (United States); Egedal, J. [University of WisconsinĖMadison, Madison, Wisconsin 53706 (United States)] [University of WisconsinĖMadison, Madison, Wisconsin 53706 (United States); Ng, J. [PPPL, Princeton University, Princeton, New Jersey 08543 (United States)] [PPPL, Princeton University, Princeton, New Jersey 08543 (United States); Scudder, J. [University of Iowa, Iowa City, Iowa 52242 (United States)] [University of Iowa, Iowa City, Iowa 52242 (United States); Daughton, W.; Liu, Y.-H. [Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)] [Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)

2014-01-15T23:59:59.000Z

264

A current density distribution tool  

E-Print Network [OSTI]

. I. INTRODUCTION Current density distribution is an important consideration for those involved in electrochemical systems and electroplating in particular. In the printed wiring board (PWB) business, great emphasis is placed on the study of current... exist. Numerical techniques on the other hand, are usually easy to implement and are easily applicable to microcomputers. Their disadvantage as with any approximation technique is that the exactness of the results with This document follows the style...

Jagush, Frederic A.

1989-01-01T23:59:59.000Z

265

Day After Trinity: Oppenheimer and the Atomic Bomb  

SciTech Connect (OSTI)

On October 31st at 4:00 pm in Panofsky Auditorium SLACís Colloquium Series will present the exceptional Oscar-nominated documentary The Day After Trinity. The film offers invaluable insight into historic events which have forever changed the face of our world Ė this screening should not to be missed. After witnessing the tremendous destructive power of the atomic bomb, J. Robert Oppenheimer declared ďI have become deathĒ. Still topically relevant a quarter of a century since its release, Director Jon Elseís documentary uses interviews, archival footage, and narration to reveal the internal landscape of the man whose leadership at Los Alamos, New Mexico, defined the rise of the Manhattan Project and the beginning of the Atomic Age. The Day After Trinity traces the unexpected path of Oppenheimerís career - from his formation of the Los Alamos colony and the first successful atomic bomb detonation at the Trinity test site in 1945, to his final years spent branded as a security risk and excluded from the atomic energy research he pioneered due to his opposition to the development of the Hydrogen bomb.

Documentary

2005-10-31T23:59:59.000Z

266

UC San Diego For A Day Lectures Available for Visitors Spring Quarter 2014  

E-Print Network [OSTI]

UC San Diego For A Day Lectures Available for Visitors Spring Quarter 2014 Day(s) Start Time End PHYS 1C Coil, Alison YORK HALL 2722 12:00 PM 12:50 PM Calculus & Analytical Geometry

Tsien, Roger Y.

267

Estimating GroundEstimating Ground--Level Solar RadiationLevel Solar Radiation and Evapotranspiration In Puerto Ricoand Evapotranspiration In Puerto Rico  

E-Print Network [OSTI]

Estimating GroundEstimating Ground--Level Solar RadiationLevel Solar Radiation radiation, therefore, solar radiation measurements throughout the island are essential. #12;Currently, including solar radiation ·In PR, solar radiation is only available at selected locations. · The majority

Gilbes, Fernando

268

Outdoor PV Module Degradation of Current-Voltage Parameters: Preprint  

SciTech Connect (OSTI)

Photovoltaic (PV) module degradation rate analysis quantifies the loss of PV power output over time and is useful for estimating the impact of degradation on the cost of energy. An understanding of the degradation of all current-voltage (I-V) parameters helps to determine the cause of the degradation and also gives useful information for the design of the system. This study reports on data collected from 12 distinct mono- and poly-crystalline modules deployed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. Most modules investigated showed < 0.5%/year decrease in maximum power due to short-circuit current decline.

Smith, R. M.; Jordan, D. C.; Kurtz, S. R.

2012-04-01T23:59:59.000Z

269

Within-Day Recharge of Plug-In Hybrid Electric Vehicles: Energy Impact of Public Charging Infrastructure  

SciTech Connect (OSTI)

This paper examines the role of public charging infrastructure in increasing the share of driving on electricity that plug-in hybrid electric vehicles might exhibit, thus reducing their gasoline consumption. Vehicle activity data obtained from a global positioning system tracked household travel survey in Austin, Texas, is used to estimate gasoline and electricity consumptions of plug-in hybrid electric vehicles. Drivers within-day recharging behavior, constrained by travel activities and public charger availability, is modeled. It is found that public charging offers greater fuel savings for hybrid electric vehicles s equipped with smaller batteries, by encouraging within-day recharge, and providing an extensive public charging service is expected to reduce plug-in hybrid electric vehicles gasoline consumption by more than 30% and energy cost by 10%, compared to the scenario of home charging only.

Dong, Jing [ORNL; Lin, Zhenhong [ORNL

2012-01-01T23:59:59.000Z

270

90-day Second Report on Shale Gas Production - Secretary of Energy...  

Broader source: Energy.gov (indexed) [DOE]

90-day Second Report on Shale Gas Production - Secretary of Energy Advisory Board 90-day Second Report on Shale Gas Production - Secretary of Energy Advisory Board Novemeber 18,...

271

Linear Extrusion 400 Tons/Day Dry Solids Pump  

SciTech Connect (OSTI)

Pratt & Whitney Rocketdyne (PWR) has developed an innovative gasifier concept that uses rocket engine experience to significantly improve gasifier performance, life, and cost compared to current state-of-the-art systems. The PWR gasifier concept uses a compact and highly efficient (>50%) dry solids pump that has excellent availability (>99.5%). PWR is currently developing this dry solids pump under a U.S. Department of Energy (DOE) cooperative agreement. The conceptual design on two dry solids pumps were completed under this agreement and one pump concept was selected for preliminary design. A preliminary design review (PDR) of the selected pump was presented on September 20, 2007 to PWR management and numerous technical specialists. Feedback from the PDR review team has been factored into the design and a Delta-PDR was held on April 9, 2008.

Kenneth Sprouse; David Matthews

2008-04-30T23:59:59.000Z

272

Computational Fluid Dynamics Modeling of the John Day Dam Tailrace  

SciTech Connect (OSTI)

US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

2010-07-08T23:59:59.000Z

273

Electrochemically Stable Cathode Current Collectors for Rechargeable...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Stable Cathode Current Collectors for Rechargeable Magnesium Batteries . Electrochemically Stable Cathode Current Collectors for Rechargeable Magnesium Batteries . Abstract:...

274

POINTWISE ESTIMATES AND MONOTONICITY FORMULAS  

E-Print Network [OSTI]

POINTWISE ESTIMATES AND MONOTONICITY FORMULAS WITHOUT MAXIMUM PRINCIPLE MARCELO MONTENEGRO;2 MARCELO MONTENEGRO AND ENRICO VALDINOCI In this paper, a central role will be played by the following

275

Variable current speed controller for eddy current motors  

DOE Patents [OSTI]

A speed control system for eddy current motors is provided in which the current to the motor from a constant frequency power source is varied by comparing the actual motor speed signal with a setpoint speed signal to control the motor speed according to the selected setpoint speed. A three-phase variable voltage autotransformer is provided for controlling the voltage from a three-phase power supply. A corresponding plurality of current control resistors is provided in series with each phase of the autotransformer output connected to inputs of a three-phase motor. Each resistor is connected in parallel with a set of normally closed contacts of plurality of relays which are operated by control logic. A logic circuit compares the selected speed with the actual motor speed obtained from a digital tachometer monitoring the motor spindle speed and operated the relays to add or substract resistance equally in each phase of the motor input to vary the motor current to control the motor at the selected speed.

Gerth, H.L.; Bailey, J.M.; Casstevens, J.M.; Dixon, J.H.; Griffith, B.O.; Igou, R.E.

1982-03-12T23:59:59.000Z

276

Linear Constrained Moving Horizon Estimator With Pre-Estimating Observer  

E-Print Network [OSTI]

in the literature, e.g. Rao et al. (2001, 2003); Alessandri et al. (2003, 2004). The idea of MHE is to estimate of robustness in the presence of uncertainties such as noise, disturbances and modeling errors, see Alessandri in the literature, e.g. Rao et al. (2001, 2003); Alessandri et al. (2003, 2004). The pre-estimator leads

Johansen, Tor Arne

277

On the Probability and Spatial Distribution of Ocean Surface Currents YOSEF ASHKENAZY  

E-Print Network [OSTI]

On the Probability and Spatial Distribution of Ocean Surface Currents YOSEF ASHKENAZY Solar Energy events, which may affect, for example, marine construction, and for estimating the energy that can of extremely severe currents, to more efficiently manage maritime trade, breakwaters, ports, etc. 2

Ashkenazy, Yossi "Yosef"

278

Stationary formulas for computing the response in eddy-current NDE  

SciTech Connect (OSTI)

Stationary or variational formulations have been proven to be useful in a number of electromagnetic problems. This paper presents such a formulation for the response in the eddy-current NDE problem. It thus provides an approach to estimating the response due to arbitrary defects in cases where a reasonable first guess for the current distribution responsible for the scattered fields can be obtained.

Hower, G.L.

1987-12-01T23:59:59.000Z

279

Indirect Estimation of Radioactivity in Containerized Cargo  

SciTech Connect (OSTI)

Detecting illicit nuclear and radiological material in containerized cargo challenges the state of the art in detection systems. Current systems are being evaluated and new systems envisioned to address the need for the high probability of detection and extremely low false alarm rates necessary to thwart potential threats and extremely low nuisance and false alarm rates while maintaining necessary to maintain the flow of commerce impacted by the enormous volume of commodities imported in shipping containers. Maintaining flow of commerce also means that primary inspection must be rapid, requiring relatively indirect measurements of cargo from outside the containers. With increasing information content in such indirect measurements, it is natural to ask how the information might be combined to improved detection. Toward this end, we present an approach to estimating isotopic activity of naturally occurring radioactive material in cargo grouped by commodity type, combining container manifest data with radiography and gamma spectroscopy aligned to location along the container. The heart of this approach is our statistical model of gamma counts within peak regions of interest, which captures the effects of background suppression, counting noise, convolution of neighboring cargo contributions, and down-scattered photons to provide physically constrained estimates of counts due to decay of specific radioisotopes in cargo alone. Coupled to that model, we use a mechanistic model of self-attenuated radiation flux to estimate the isotopic activity within cargo, segmented by location within each container, that produces those counts. We demonstrate our approach by applying it to a set of measurements taken at the Port of Seattle in 2006. This approach to synthesizing disparate available data streams and extraction of cargo characteristics holds the potential to improve primary inspection using current detection capabilities and to enable simulation-based evaluation of new candidate detection systems.

Jarman, Kenneth D.; Scherrer, Chad; Smith, Eric L.; Chilton, Lawrence; Anderson, K. K.; Ressler, Jennifer J.; Trease, Lynn L.

2011-01-01T23:59:59.000Z

280

Current responsive devices for synchronous generators  

DOE Patents [OSTI]

A device for detecting current imbalance between phases of a polyphase alternating current generator. A detector responds to the maximum peak current in the generator, and detecting means generates an output for each phase proportional to the peak current of each phase. Comparing means generates an output when the maximum peak current exceeds the phase peak current. 11 figs.

Karlicek, R.F.

1983-09-27T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Frequency tracking and parameter estimation for robust quantum state estimation  

SciTech Connect (OSTI)

In this paper we consider the problem of tracking the state of a quantum system via a continuous weak measurement. If the system Hamiltonian is known precisely, this merely requires integrating the appropriate stochastic master equation. However, even a small error in the assumed Hamiltonian can render this approach useless. The natural answer to this problem is to include the parameters of the Hamiltonian as part of the estimation problem, and the full Bayesian solution to this task provides a state estimate that is robust against uncertainties. However, this approach requires considerable computational overhead. Here we consider a single qubit in which the Hamiltonian contains a single unknown parameter. We show that classical frequency estimation techniques greatly reduce the computational overhead associated with Bayesian estimation and provide accurate estimates for the qubit frequency.

Ralph, Jason F. [Department of Electrical Engineering and Electronics, University of Liverpool, Brownlow Hill, Liverpool L69 3GJ (United Kingdom); Jacobs, Kurt [Department of Physics, University of Massachusetts at Boston, 100 Morrissey Blvd, Boston, Massachusetts 02125 (United States); Hill, Charles D. [Centre for Quantum Computation and Communication Technology, School of Physics, University of Melbourne, Victoria 3010 (Australia)

2011-11-15T23:59:59.000Z

282

Escapement and Productivity of Spring Chinook and Summer Steelhead in the John Day River Basin, Technical Report 2004-2005.  

SciTech Connect (OSTI)

The objectives are: (1) Estimate number and distribution of spring Chinook salmon Oncorhynchus tshawytscha redds and spawners in the John Day River subbasin; and (2) Estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook and summer steelhead O. mykiss and life history characteristics of summer steelhead. Spawning ground surveys for spring (stream-type) Chinook salmon were conducted in four main spawning areas (Mainstem, Middle Fork, North Fork, and Granite Creek System) and seven minor spawning areas (South Fork, Camas Creek, Desolation Creek, Trail Creek, Deardorff Creek, Clear Creek, and Big Creek) in the John Day River basin during August and September of 2005. Census surveys included 298.2 river kilometers (88.2 rkm within index, 192.4 rkm additional within census, and 17.6 rkm within random survey areas) of spawning habitat. We observed 902 redds and 701 carcasses including 227 redds in the Mainstem, 178 redds in the Middle Fork, 420 redds in the North Fork, 62 redds in the Granite Creek System, and 15 redds in Desolation Creek. Age composition of carcasses sampled for the entire basin was 1.6% age 3, 91.2% age 4, and 7.1% age 5. The sex ratio was 57.4% female and 42.6% male. Significantly more females than males were observed in the Granite Creek System. During 2005, 82.3% of female carcasses sampled had released all of their eggs. Significantly more pre-spawn mortalities were observed in Granite Creek. Nine (1.3%) of 701 carcasses were of hatchery origin. Of 298 carcasses examined, 4.0% were positive for the presence of lesions. A significantly higher incidence of gill lesions was found in the Granite Creek System when compared to the rest of the basin. Of 114 kidney samples tested, two (1.8%) had clinical BKD levels. Both infected fish were age-4 females in the Middle Fork. All samples tested for IHNV were negative. To estimate spring Chinook and summer steelhead smolt-to-adult survival (SAR) we PIT tagged 5,138 juvenile Chinook and 4,913 steelhead during the spring of 2005. We estimated that 130,144 (95% CL's 97,133-168,409) Chinook emigrated from the upper John Day subbasin past our seining area in the Mainstem John Day River (river kilometers 274-296) between February 4 and June 16, 2005. We also estimated that 32,601 (95% CL's 29,651 and 36,264) Chinook and 47,921 (95% CL's 35,025 and 67,366) steelhead migrated past our Mainstem rotary screw trap at river kilometer (rkm) 326 between October 4, 2004 and July 6, 2005. We estimated that 20,193 (95% CL's 17,699 and 22,983) Chinook and 28,980 (95% CL's 19,914 and 43,705) steelhead migrated past our Middle Fork trap (rkm 24) between October 6, 2004 and June 17, 2005. Seventy three percent of PIT tagged steelhead migrants were age-2 fish, 13.8% were age-3, 12.7% were age-2, and 0.3% were age 4. Spring Chinook SAR for the 2002 brood year was estimated at 2.5% (100 returns of 4,000 PIT tagged smolts). Preliminary steelhead SAR (excluding 2-ocean fish) for the 2004 tagging year was estimated at 1.61% (60 returns of 3,732 PIT-tagged migrants).

Wilson, Wayne

2007-04-01T23:59:59.000Z

283

Overmodulation in Current Controlled Drives  

E-Print Network [OSTI]

220 Chapter 5 Overmodulation in Current Controlled Drives 5.1 Introduction The performance of voltage feedforward controlled constant V f PWM-VSI drives is insu cient for most industrial processes performance control methods. Electric traction, el- evators, textile machines, paper and plastic machines

Hava, Ahmet

284

System Level Payoffs Current Accomplishments  

E-Print Network [OSTI]

Scientific Challenges War fighter Benefit · Develop approach for spot-type welding of dissimilar refractory of refractory dissimilar materials. For example: ·Carbon composite - Carbon; ·Silicon carbide ­ Metal alloys#12;System Level Payoffs Current Accomplishments Joining of Refractory and Dissimilar Materials

Mukasyan, Alexander

285

Current Issue June 10, 2009  

E-Print Network [OSTI]

Current Issue June 10, 2009 Vol. 109, No. 15 LETTERS CLASS NOTES MEMORIALS ALUMNI PROFILES SEARCH > Alum's startup company bets on Princeton research Alum's startup company bets on Princeton research materials-science innovation into a promising startup company. John Lettow '95, president and co

Aksay, Ilhan A.

286

UNL WATER CENTER WATER CURRENT  

E-Print Network [OSTI]

................ Sidney Area Deals with Drought 6................ Water and Electricity Are Inseparable 10's East Campus. "Consolidating administration,faculty and staff and facilities is costeffectiveandper or commercial products constitute endorsement by the U.S. Government. WATER CURRENT Water Center University

Nebraska-Lincoln, University of

287

Conservation Comparison of Plan, Current  

E-Print Network [OSTI]

Northwest Power and Conservation Council Comparison of Plan, Current Policy, and No-Policy Cases Power Committee Web Meeting June 30, 2009 Northwest Power and Conservation Council Definition of Cases, new plant emissions limits, and carbon price risk #12;Northwest Power and Conservation Council

288

Optimization of Current Carrying Multicables  

E-Print Network [OSTI]

approach. Keywords Shape optimization · Genetic algorithm · Electric cables · Finite element method · Joule material, space and weight, manufacturers reduce cable diameters which is only possible to a certain extend multicables Helmut Harbrecht · Florian Loos Received: date / Accepted: date Abstract High currents in cable

Kraft, Hanspeter

289

High critical current superconducting tapes  

DOE Patents [OSTI]

Improvements in critical current capacity for superconducting film structures are disclosed and include the use of a superconducting RE-BCO layer including a mixture of rare earth metals, e.g., yttrium and europium, where the ratio of yttrium to europium in the RE-BCO layer ranges from about 3 to 1 to from about 1.5 to 1.

Holesinger, Terry G. (Los Alamos, NM); Jia, Quanxi (Los Alamos, NM); Foltyn, Stephen R. (Los Alamos, NM)

2003-09-23T23:59:59.000Z

290

UNL WATER CENTER WATER CURRENT  

E-Print Network [OSTI]

INSIDE UNL WATER CENTER WATER CURRENT PROTECTING NEBRASKA√≠S WATER RESOURCES THROUGH RESEARCH with a vision, there√≠s an untapped market using resources right under our feet,√ģ the University of Nebraska outdoors in India, Bangladesh, China and Viet- nam. Thousands of them have been grown to harvest

Nebraska-Lincoln, University of

291

Examples of Cost Estimation Packages  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

1997-03-28T23:59:59.000Z

292

Big Bang Day: 5 Particles - 5. The Next Particle  

ScienceCinema (OSTI)

Simon Singh looks at the stories behind the discovery of 5 of the universe's most significant subatomic particles: the Electron, the Quark, the Anti-particle, the Neutrino and the "next particle". 5. The Next Particle The "sparticle" - a super symmetric partner to all the known particles could be the answer to uniting all the known particles and their interactions under one grand theoretical pattern of activity. But how do researchers know where to look for such phenomena and how do they know if they find them? Simon Singh reviews the next particle that physicists would like to find if the current particle theories are to ring true.

None

2011-04-25T23:59:59.000Z

293

Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review  

SciTech Connect (OSTI)

This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

Not Available

2009-09-01T23:59:59.000Z

294

Estimating current and future benefits of airport surface congestion management techniques  

E-Print Network [OSTI]

Air traffic is expected to continue to grow in the future and improved methods for dealing with the increased demand on the system need to be designed and implemented. One method for reducing surface congestion at airports ...

Nakahara, Alex (Alex Hiroo)

2012-01-01T23:59:59.000Z

295

Current (2009) State-of-the-Art Hydrogen Production Cost Estimate  

E-Print Network [OSTI]

and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 capacity factor C/S/D compression, storage, and dispensing DOE U.S. Department of Energy DSM dimensionally Renewable Energy Laboratory 1617 Cole Boulevard · Golden, Colorado 80401-3393 303-275-3000 · www

296

Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebratePartners with Siemens31, 2015 | Department of

297

Reassessing Wind Potential Estimates for India: Economic and Policy Implications  

SciTech Connect (OSTI)

We assess developable on-shore wind potential in India at three different hub-heights and under two sensitivity scenarios Ė one with no farmland included, the other with all farmland included. Under the ďno farmland includedĒ case, the total wind potential in India ranges from 748 GW at 80m hub-height to 976 GW at 120m hub-height. Under the ďall farmland includedĒ case, the potential with a minimum capacity factor of 20 percent ranges from 984 GW to 1,549 GW. High quality wind energy sites, at 80m hub-height with a minimum capacity factor of 25 percent, have a potential between 253 GW (no farmland included) and 306 GW (all farmland included). Our estimates are more than 15 times the current official estimate of wind energy potential in India (estimated at 50m hub height) and are about one tenth of the official estimate of the wind energy potential in the US.

Phadke, Amol; Bharvirkar, Ranjit; Khangura, Jagmeet

2011-09-15T23:59:59.000Z

298

Estimation of hydrologic properties of an unsaturated, fractured rock mass  

SciTech Connect (OSTI)

In this document, two distinctly different approaches are used to develop continuum models to evaluate water movement in a fractured rock mass. Both models provide methods for estimating rock-mass hydrologic properties. Comparisons made over a range of different tuff properties show good qualitative and quantitative agreement between estimates of rock-mass hydrologic properties made by the two models. This document presents a general discussion of: (1) the hydrology of Yucca Mountain, and the conceptual hydrological model currently being used for the Yucca Mountain site, (2) the development of two models that may be used to estimate the hydrologic properties of a fractured, porous rock mass, and (3) a comparison of the hydrologic properties estimated by these two models. Although the models were developed in response to hydrologic characterization requirements at Yucca Mountain, they can be applied to water movement in any fractured rock mass that satisfies the given assumptions.

Klavetter, E.A.; Peters, R.R.

1986-07-01T23:59:59.000Z

299

Model estimates of the mass balance of the Greenland and Antartic ice sheets  

E-Print Network [OSTI]

The six possible combinations of two climate models and three methods for calculating the melting of snow and ice are used to estimate current values of accumulation and ablation on the Greenland and Antarctic ice sheets. ...

Bugnion, Vťronique.

300

ADAPTION OF NONSTANDARD PIPING COMPONENTS INTO PRESENT DAY SEISMIC CODES  

SciTech Connect (OSTI)

With spiraling energy demand and flat energy supply, there is a need to extend the life of older nuclear reactors. This sometimes requires that existing systems be evaluated to present day seismic codes. Older reactors built in the 1960s and early 1970s often used fabricated piping components that were code compliant during their initial construction time period, but are outside the standard parameters of present-day piping codes. There are several approaches available to the analyst in evaluating these non-standard components to modern codes. The simplest approach is to use the flexibility factors and stress indices for similar standard components with the assumption that the non-standard componentís flexibility factors and stress indices will be very similar. This approach can require significant engineering judgment. A more rational approach available in Section III of the ASME Boiler and Pressure Vessel Code, which is the subject of this paper, involves calculation of flexibility factors using finite element analysis of the non-standard component. Such analysis allows modeling of geometric and material nonlinearities. Flexibility factors based on these analyses are sensitive to the load magnitudes used in their calculation, load magnitudes that need to be consistent with those produced by the linear system analyses where the flexibility factors are applied. This can lead to iteration, since the magnitude of the loads produced by the linear system analysis depend on the magnitude of the flexibility factors. After the loading applied to the nonstandard component finite element model has been matched to loads produced by the associated linear system model, the component finite element model can then be used to evaluate the performance of the component under the loads with the nonlinear analysis provisions of the Code, should the load levels lead to calculated stresses in excess of Allowable stresses. This paper details the application of component-level finite element modeling to account for geometric and material nonlinear component behavior in a linear elastic piping system model. Note that this technique can be applied to the analysis of B31 piping systems.

D. T. Clark; M. J. Russell; R. E. Spears; S. R. Jensen

2009-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Estimating Demand Response Load Impacts: Evaluation of BaselineLoad Models for Non-Residential Buildings in California  

SciTech Connect (OSTI)

Both Federal and California state policymakers areincreasingly interested in developing more standardized and consistentapproaches to estimate and verify the load impacts of demand responseprograms and dynamic pricing tariffs. This study describes a statisticalanalysis of the performance of different models used to calculate thebaseline electric load for commercial buildings participating in ademand-response (DR) program, with emphasis onthe importance of weathereffects. During a DR event, a variety of adjustments may be made tobuilding operation, with the goal of reducing the building peak electricload. In order to determine the actual peak load reduction, an estimateof what the load would have been on the day of the event without any DRactions is needed. This baseline load profile (BLP) is key to accuratelyassessing the load impacts from event-based DR programs and may alsoimpact payment settlements for certain types of DR programs. We testedseven baseline models on a sample of 33 buildings located in California.These models can be loosely categorized into two groups: (1) averagingmethods, which use some linear combination of hourly load values fromprevious days to predict the load on the event, and (2) explicit weathermodels, which use a formula based on local hourly temperature to predictthe load. The models were tested both with and without morningadjustments, which use data from the day of the event to adjust theestimated BLP up or down.Key findings from this study are: - The accuracyof the BLP model currently used by California utilities to estimate loadreductions in several DR programs (i.e., hourly usage in highest 3 out of10 previous days) could be improved substantially if a morning adjustmentfactor were applied for weather-sensitive commercial and institutionalbuildings. - Applying a morning adjustment factor significantly reducesthe bias and improves the accuracy of all BLP models examined in oursample of buildings. - For buildings with low load variability, all BLPmodels perform reasonably well in accuracy. - For customer accounts withhighly variable loads, we found that no BLP model produced satisfactoryresults, although averaging methods perform best in accuracy (but notbias). These types of customers are difficult to characterize withstandard BLP models that rely on historic loads and weather data.Implications of these results for DR program administrators andpolicymakersare: - Most DR programs apply similar DR BLP methods tocommercial and industrial sector customers. The results of our study whencombined with other recent studies (Quantum 2004 and 2006, Buege et al.,2006) suggests that DR program administrators should have flexibility andmultiple options for suggesting the most appropriate BLP method forspecific types of customers.

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote,Sila

2008-01-01T23:59:59.000Z

302

Currents on MDT end plugs  

E-Print Network [OSTI]

A sample of MDT tubes was irradiated in the CERN X5 facility to study their aging behaviour. Part of these tubes were subjected to a glow discharge cleaning (sputtering) with reversed high voltage up to 1660 mC/cm. Current and Ohmic resistance measurements on these tubes gave the same null result as for non-irradiated tubes. The inner plastic surface of one end plug was analysed through the XPS technique. No traces of aluminium were found.

Paschhoff, V

1998-01-01T23:59:59.000Z

303

For current viewing resistor loads  

DOE Patents [OSTI]

The invention comprises a terminal unit for a flat cable comprising a BNC-PCB connector having a pin for electrically contacting one or more conducting elements of a flat cable, and a current viewing resistor having an opening through which the pin extends and having a resistor face that abuts a connector face of the BNC-PCB connector, wherein the device is a terminal unit for the flat cable.

Lyons, Gregory R. (Tijeras, NM); Hass, Jay B. (Lee's Summit, MO)

2011-04-19T23:59:59.000Z

304

The Current Status of Asteroseismology  

E-Print Network [OSTI]

Stellar evolution, a fundamental bedrock of modern astrophysics, is driven by the physical processes in stellar interiors. While we understand these processes in general terms, we lack some important ingredients. Seemingly small uncertainties in the input physics of the models, e.g., the opacities or the amount of mixing and of interior rotation, have large consequences for the evolution of stars. The goal of asteroseismology is to improve the description of the interior physics of stars by means of their oscillations, just as global helioseismology led to a huge step forward in our knowledge about the internal structure of the Sun. In this paper we present the current status of asteroseismology by considering case studies of stars with a variety of masses and evolutionary stages. In particular, we outline how the confrontation between the observed oscillation frequencies and those predicted by the models allows us to pinpoint limitations of the input physics of current models and improve them to a level that cannot be reached with any other current method.

C. Aerts; J. Christensen-Dalsgaard; M. Cunha; D. W. Kurtz

2008-03-25T23:59:59.000Z

305

Big Bang Day: 5 Particles - 1. The Electron  

ScienceCinema (OSTI)

Simon Singh looks at the stories behind the discovery of 5 of the universe's most significant subatomic particles: the Electron, the Quark, the Anti-particle, the Neutrino and the "next particle". 1. The Electron Just over a century ago, British physicist J.J. Thompson experimenting with electric currents and charged particles inside empty glass tubes, showed that atoms are divisible into indivisible elementary particles. But how could atoms be built up of these so called "corpuscles"? An exciting 30 year race ensued, to grasp the planetary model of the atom with its orbiting electrons, and the view inside the atom was born. Whilst the number of electrons around the nucleus of an atom determines their the chemistry of all elements, the power of electrons themselves have been harnessed for everyday use: electron beams for welding,cathode ray tubes and radiation therapy.

None

2011-04-25T23:59:59.000Z

306

Estimating air-sea fluxes of heat, freshwater, and momentum through global ocean data assimilation  

E-Print Network [OSTI]

Estimating air-sea fluxes of heat, freshwater, and momentum through global ocean data assimilation of surface flux adjustments made to the initial NCEP re-analysis-1 products. During the state estimation the boundary current regions, they are consistent with known large-scale deficiencies in the NCEP products

307

Experimental Comparison of Observers for Tool Position Estimation of Industrial Robots  

E-Print Network [OSTI]

Experimental Comparison of Observers for Tool Position Estimation of Industrial Robots Robert methods for tool position estimation of industrial robots. It is assumed that the motor angular position industrial robot. I. INTRODUCTION Current industrial robot development is focused on in- creasing the robot

Schön, Thomas

308

SECPOP90: Sector population, land fraction, and economic estimation program  

SciTech Connect (OSTI)

In 1973 Mr. W. Athey of the Environmental Protection Agency wrote a computer program called SECPOP which calculated population estimates. Since that time, two things have changed which suggested the need for updating the original program - more recent population censuses and the widespread use of personal computers (PCs). The revised computer program uses the 1990 and 1992 Population Census information and runs on current PCs as {open_quotes}SECPOP90.{close_quotes} SECPOP90 consists of two parts: site and regional. The site provides population and economic data estimates for any location within the continental United States. Siting analysis is relatively fast running. The regional portion assesses site availability for different siting policy decisions; i.e., the impact of available sites given specific population density criteria within the continental United States. Regional analysis is slow. This report compares the SECPOP90 population estimates and the nuclear power reactor licensee-provided information. Although the source, and therefore the accuracy, of the licensee information is unknown, this comparison suggests SECPOP90 makes reasonable estimates. Given the total uncertainty in any current calculation of severe accidents, including the potential offsite consequences, the uncertainty within SECPOP90 population estimates is expected to be insignificant. 12 refs., 55 figs., 7 tabs.

Humphreys, S.L.; Rollstin, J.A.; Ridgely, J.N.

1997-09-01T23:59:59.000Z

309

Measurement enhancement for state estimation  

E-Print Network [OSTI]

of a few phasor measurement units (PMU) in the system can significantly increase measurement redundancy, which in turn can improve the capability of state estimation to detect and identify bad data, even during loss of measurements. Meanwhile, strategic...

Chen, Jian

2009-05-15T23:59:59.000Z

310

Bounded limit for the Monte Carlo point-flux-estimator  

SciTech Connect (OSTI)

In a Monte Carlo random walk the kernel K(R,E) is used as an expected value estimator at every collision for the collided flux phi/sub c/ r vector,E) at the detector point. A limiting value for the kernel is derived from a diffusion approximation for the probability current at a radius R/sub 1/ from the detector point. The variance of the collided flux at the detector point is thus bounded using this asymptotic form for K(R,E). The bounded point flux estimator is derived. (WHK)

Grimesey, R.A.

1981-01-01T23:59:59.000Z

311

Chapter 17: Estimating Net Savings: Common Practices  

SciTech Connect (OSTI)

This chapter focuses on the methods used to estimate net energy savings in evaluation, measurement, and verification (EM&V) studies for energy efficiency (EE) programs. The chapter provides a definition of net savings, which remains an unsettled topic both within the EE evaluation community and across the broader public policy evaluation community, particularly in the context of attribution of savings to particular program. The chapter differs from the measure-specific Uniform Methods Project (UMP) chapters in both its approach and work product. Unlike other UMP resources that provide recommended protocols for determining gross energy savings, this chapter describes and compares the current industry practices for determining net energy savings, but does not prescribe particular methods.

Violette, D. M.; Rathbun, P.

2014-09-01T23:59:59.000Z

312

Quantifying turbidity current interactions with topography  

E-Print Network [OSTI]

This thesis advances our understanding of how transport properties of turbidity currents are mediated by interactions with seafloor topography, specifically channelized surfaces. Turbidity currents are responsible for ...

Straub, Kyle M

2007-01-01T23:59:59.000Z

313

Fuel Cells - Current Technology | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cells - Current Technology Fuel Cells - Current Technology Today, fuel cells are being developed to power passenger vehicles, commercial buildings, homes, and even small...

314

Hydrogen Production - Current Technology | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Current Technology Hydrogen Production - Current Technology The development of clean, sustainable, and cost-competitive hydrogen production processes is key to a viable future...

315

ARM - Lesson Plans: Current Weather  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related InformationAcid Rain Outreach Home RoomClimate inCurrent

316

PNNL: News Center - Currents Newsletter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven Ashby Dr. Steven Ashby Photo Dr.1999alt= Currents

317

Current Students | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: Crude OilPublic Safety and100Current Students Four

318

Current Toolbox Models: MACCS2  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2Consolidated Edison UraniumCredit-BasedSafety, Codes,Current

319

Current | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The following text isRica NRELPower Comm Jump to:CuivreCurrent

320

Current Jobs | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FY 2014| Princeton PlasmaCurrentJob

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Currents, Berkeley Lab's Biweekly Newspaper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FY 2014|Current

322

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008  

SciTech Connect (OSTI)

The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

2009-12-01T23:59:59.000Z

323

A Bayesian Framework for Combining Valuation Estimates  

E-Print Network [OSTI]

Obtaining more accurate equity value estimates is the starting point for stock selection, value-based indexing in a noisy market, and beating benchmark indices through tactical style rotation. Unfortunately, discounted cash flow, method of comparables, and fundamental analysis typically yield discrepant valuation estimates. Moreover, the valuation estimates typically disagree with market price. Can one form a superior valuation estimate by averaging over the individual estimates, including market price? This article suggests a Bayesian framework for combining two or more estimates into a superior valuation estimate. The framework justifies the common practice of averaging over several estimates to arrive at a final point estimate.

Kenton K. Yee

2007-07-24T23:59:59.000Z

324

A Bayesian Framework for Combining Valuation Estimates  

E-Print Network [OSTI]

Obtaining more accurate equity value estimates is the starting point for stock selection, value-based indexing in a noisy market, and beating benchmark indices through tactical style rotation. Unfortunately, discounted cash flow, method of comparables, and fundamental analysis typically yield discrepant valuation estimates. Moreover, the valuation estimates typically disagree with market price. Can one form a superior valuation estimate by averaging over the individual estimates, including market price? This article suggests a Bayesian framework for combining two or more estimates into a superior valuation estimate. The framework justifies the common practice of averaging over several estimates to arrive at a final point estimate.

Yee, Kenton K

2007-01-01T23:59:59.000Z

325

High Critical Current Coated Conductors  

SciTech Connect (OSTI)

One of the important critical needs that came out of the DOEís coated conductor workshop was to develop a high throughput and economic deposition process for YBCO. Metal-organic chemical vapor deposition (MOCVD) technique, the most critical steps in high technical micro fabrications, has been widely employed in semiconductor industry for various thin film growth. SuperPower has demonstrated that (Y,Gd)BCO films can be deposited rapid with world record performance. In addition to high critical current density with increased film thickness, flux pinning properties of REBCO films needs to be improved to meet the DOE requirements for various electric-power equipments. We have shown that doping with Zr can result in BZO nanocolumns, but at substantially reduced deposition rate. The primary purpose of this subtask is to develop high current density MOCVD-REBCO coated conductors based on the ion-beam assisted (IBAD)-MgO deposition process. Another purpose of this subtask is to investigate HTS conductor design optimization (maximize Je) with emphasis on stability and protection issues, and ac loss for REBCO coated conductors.

Paranthaman, M. P.; Selvamanickam, V. (SuperPower, Inc.)

2011-12-27T23:59:59.000Z

326

Impacts of Improved Day-Ahead Wind Forecasts on Power Grid Operations: September 2011  

SciTech Connect (OSTI)

This study analyzed the potential benefits of improving the accuracy (reducing the error) of day-ahead wind forecasts on power system operations, assuming that wind forecasts were used for day ahead security constrained unit commitment.

Piwko, R.; Jordan, G.

2011-11-01T23:59:59.000Z

327

Resolving to Make Earth Day Last All Year | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resolving to Make Earth Day Last All Year Resolving to Make Earth Day Last All Year March 21, 2011 - 4:49pm Addthis Amy Foster Parish What was your New Year's resolution this year?...

328

Resolving to Make Earth Day Last All Year | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resolving to Make Earth Day Last All Year Resolving to Make Earth Day Last All Year March 21, 2011 - 1:31pm Addthis Amy Foster Parish What was your New Year's resolution this year?...

329

Take Our Daughters and Sons to Work Day | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

this year for Take your Sons and Daughters to Work Day, DOE has combined it with Earth Week's "Community Day" to honor the celebration. The event starts at 7:00AM with a...

330

Bluer Skies and Brighter Days: The U.S. and India Collaborate...  

Office of Environmental Management (EM)

Bluer Skies and Brighter Days: The U.S. and India Collaborate in First Long-Term Climate Experiment Bluer Skies and Brighter Days: The U.S. and India Collaborate in First Long-Term...

331

Day 2 at the 2014 ARPA-E Innovation Summit | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Day 2 at the 2014 ARPA-E Innovation Summit Day 2 at the 2014 ARPA-E Innovation Summit February 25, 2014 - 5:35pm Addthis 1 of 14 The Energy Department's ARPA-E Energy Innovation...

332

Memorial Day Weekend Sales Tax Holiday for Energy-Efficient Products  

Broader source: Energy.gov [DOE]

Purchases of certain energy-efficient products during Memorial Day weekend are exempt from the state sales and use tax.* This amounts to a three-day tax holiday beginning on the Saturday preceding...

333

Four Days Left to Buy Energy-Efficient Products for a 2009 Tax...  

Broader source: Energy.gov (indexed) [DOE]

Four Days Left to Buy Energy-Efficient Products for a 2009 Tax Credit Four Days Left to Buy Energy-Efficient Products for a 2009 Tax Credit December 28, 2009 - 7:30am Addthis...

334

Tribal Summit Live: 9:30-10 AM ET Today and All Day Tomorrow...  

Broader source: Energy.gov (indexed) [DOE]

Summit Live: 9:30-10 AM ET Today and All Day Tomorrow Tribal Summit Live: 9:30-10 AM ET Today and All Day Tomorrow May 4, 2011 - 8:00am Addthis Ginny Simmons Ginny Simmons Former...

335

Two-Day Geothermal Symposium to Highlight Low-Temperature Power...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Two-Day Geothermal Symposium to Highlight Low-Temperature Power Production Two-Day Geothermal Symposium to Highlight Low-Temperature Power Production July 7, 2010 - 2:10pm Addthis...

336

Weldon Spring historical dose estimate  

SciTech Connect (OSTI)

This study was conducted to determine the estimated radiation doses that individuals in five nearby population groups and the general population in the surrounding area may have received as a consequence of activities at a uranium processing plant in Weldon Spring, Missouri. The study is retrospective and encompasses plant operations (1957-1966), cleanup (1967-1969), and maintenance (1969-1982). The dose estimates for members of the nearby population groups are as follows. Of the three periods considered, the largest doses to the general population in the surrounding area would have occurred during the plant operations period (1957-1966). Dose estimates for the cleanup (1967-1969) and maintenance (1969-1982) periods are negligible in comparison. Based on the monitoring data, if there was a person residing continually in a dwelling 1.2 km (0.75 mi) north of the plant, this person is estimated to have received an average of about 96 mrem/yr (ranging from 50 to 160 mrem/yr) above background during plant operations, whereas the dose to a nearby resident during later years is estimated to have been about 0.4 mrem/yr during cleanup and about 0.2 mrem/yr during the maintenance period. These values may be compared with the background dose in Missouri of 120 mrem/yr.

Meshkov, N.; Benioff, P.; Wang, J.; Yuan, Y.

1986-07-01T23:59:59.000Z

337

Nonlocal Condensates and Current-Current Correlators within the Instanton Liquid Model  

E-Print Network [OSTI]

The quark and gluon nonlocal condensates and current-current correlators are discussed within the instanton liquid model.

A. E. Dorokhov

2006-01-14T23:59:59.000Z

338

Estimating carbon dioxide emission factors for the California electric power sector  

SciTech Connect (OSTI)

The California Climate Action Registry (''Registry'') was initially established in 2000 under Senate Bill 1771, and clarifying legislation (Senate Bill 527) was passed in September 2001. The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) has been asked to provide technical assistance to the California Energy Commission (CEC) in establishing methods for calculating average and marginal electricity emissions factors, both historic and current, as well as statewide and for sub-regions. This study is exploratory in nature. It illustrates the use of three possible approaches and is not a rigorous estimation of actual emissions factors. While the Registry will ultimately cover emissions of all greenhouse gases (GHGs), presently it is focusing on carbon dioxide (CO2). Thus, this study only considers CO2, which is by far the largest GHG emitted in the power sector. Associating CO2 emissions with electricity consumption encounters three major complications. First, electricity can be generated from a number of different primary energy sources, many of which are large sources of CO2 emissions (e.g., coal combustion) while others result in virtually no CO{sub 2} emissions (e.g., hydro). Second, the mix of generation resources used to meet loads may vary at different times of day or in different seasons. Third, electrical energy is transported over long distances by complex transmission and distribution systems, so the generation sources related to electricity usage can be difficult to trace and may occur far from the jurisdiction in which that energy is consumed. In other words, the emissions resulting from electricity consumption vary considerably depending on when and where it is used since this affects the generation sources providing the power. There is no practical way to identify where or how all the electricity used by a certain customer was generated, but by reviewing public sources of data the total emission burden of a customer's electricity supplier can b e found and an average emissions factor (AEF) calculated. These are useful for assigning a net emission burden to a facility. In addition, marginal emissions factors (MEFs) for estimating the effect of changing levels of usage can be calculated. MEFs are needed because emission rates at the margin are likely to diverge from the average. The overall objective of this task is to develop methods for estimating AEFs and MEFs that can provide an estimate of the combined net CO2 emissions from all generating facilities that provide electricity to California electricity customers. The method covers the historic period from 1990 to the present, with 1990 and 1999 used as test years. The factors derived take into account the location and time of consumption, direct contracts for power which may have certain atypical characteristics (e.g., ''green'' electricity from renewable resources), resource mixes of electricity providers, import and export of electricity from utility owned and other sources, and electricity from cogeneration. It is assumed that the factors developed in this way will diverge considerably from simple statewide AEF estimates based on standardized inventory estimates that use conventions inconsistent with the goals of this work. A notable example concerns the treatment of imports, which despite providing a significant share of California's electricity supply picture, are excluded from inventory estimates of emissions, which are based on geographical boundaries of the state.

Marnay, Chris; Fisher, Diane; Murtishaw, Scott; Phadke, Amol; Price, Lynn; Sathaye, Jayant

2002-08-01T23:59:59.000Z

339

Intrusive gravity currents in two-layer  

E-Print Network [OSTI]

Intrusive gravity currents in two-layer stratified media Morris R. Flynn & Paul F. Linden Dept to as a gravity current · In contrast to waves, gravity currents transport significant mass (e.g. fluid parcels, sediment, insects, etc.) Introduction Gravity currents in the environment www

Flynn, Morris R.

340

Rotating concave eddy current probe  

SciTech Connect (OSTI)

A rotating concave eddy current probe for detecting fatigue cracks hidden from view underneath the head of a raised head fastener, such as a buttonhead-type rivet, used to join together structural skins, such as aluminum aircraft skins. The probe has a recessed concave dimple in its bottom surface that closely conforms to the shape of the raised head. The concave dimple holds the probe in good alignment on top of the rivet while the probe is rotated around the rivet's centerline. One or more magnetic coils are rigidly embedded within the probe's cylindrical body, which is made of a non-conducting material. This design overcomes the inspection impediment associated with widely varying conductivity in fastened joints.

Roach, Dennis P. (Albuquerque, NM); Walkington, Phil (Albuquerque, NM); Rackow, Kirk A. (Albuquerque, NM); Hohman, Ed (Albuquerque, NM)

2008-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The Portable Extensible Toolkit for Scientific computing Day 1: Usage and Algorithms  

E-Print Network [OSTI]

The Portable Extensible Toolkit for Scientific computing Day 1: Usage and Algorithms Jed Brown CSCS runs performantly on a laptop ∑ No iPhone support Jed Brown (ETH ZŁrich) PETSc day 1 CSCS 2010-05-10 5) ∑ Same code runs performantly on a laptop ∑ No iPhone support Jed Brown (ETH ZŁrich) PETSc day 1 CSCS

342

ESA's Programme of Exploration 1st June Aurora Industry Day 1  

E-Print Network [OSTI]

ESA's Programme of Exploration 1st June Aurora Industry Day 1 Aurora Core Programme Approach Proposed for Mars Sample Return Preparation Aurora Industry Day ≠ 1st June 2006 A. PRADIER #12;ESA's Programme of Exploration 1st June Aurora Industry Day 2 OVERALL MSR CONTEXT MARS SAMPLE RETURN Represents

343

PhD day Utrecht University Graduate School of Life Sciences  

E-Print Network [OSTI]

PhD day Utrecht University Graduate School of Life Sciences On April 4 2014 the first PhD Day of the Utrecht University Graduate School of Life Sciences `Maximize your Career Perspectives' is organized here. `Maximize your Career Opportunities' The day is open to all PhD candidates of the Utrecht

Utrecht, Universiteit

344

Extreme Day Returns on Stocks: Evidence from Sweden* Adri De Ridder  

E-Print Network [OSTI]

Extreme Day Returns on Stocks: Evidence from Sweden* Adri De Ridder Gotland University Visby and Amalia Wallenberg foundation is gratefully acknowledged. #12;Extreme Day Returns on Stocks: Evidence from Sweden Abstract In this study we document that the frequency of extreme trading days, defined

Djehiche, Boualem

345

Optical Flow Estimation versus Motion Estimation Draft: Anita Sellent  

E-Print Network [OSTI]

. In the proposed challenge we aim to estimate the physical motion of objects. In industrial applications in the Camera System In industrial applications, sufficient illumination cannot always be provided. This can in the path of a robot or the trajectories of objects [7,12,13,17]. Video cameras provide information

Heermann, Dieter W.

346

GPS coordinates estimation and camera calibration from solar shadows Imran N. Junejo a,*, Hassan Foroosh b  

E-Print Network [OSTI]

GPS coordinates estimation and camera calibration from solar shadows Imran N. Junejo a,*, Hassan requires as few as two shadow casting objects in the scene and a set of six or more points on the shadow) is the shadow trajectories of two stationary objects during the course of a day. The use of shadow trajectory

Foroosh, Hassan

347

Effects of portal infusions of methionine on plasma concentrations and estimated hepatic balances of metabolites  

E-Print Network [OSTI]

Effects of portal infusions of methionine on plasma concentrations and estimated hepatic balances, 63122 Saint-Genès-Champanelle, France The effects of portal infusions of methionine (Met) were studied al, 1988). After a control measurement on day 23, Met was infused in the portal vein for 7 h after

Paris-Sud XI, Université de

348

On the Performance of Dimension Estimation-based Spectrum Sensing for Cognitive Radio  

E-Print Network [OSTI]

On the Performance of Dimension Estimation-based Spectrum Sensing for Cognitive Radio Bassem Zayen-day spectrum allocation and spectrum use suggests that radio spectrum shortage could be overcome by allowing immediate local spectrum availability. A new class of radios that is able to reliably sense the spectral

Gesbert, David

349

Estimating Use of Non-Motorized Infrastructure: Models of Bicycle and  

E-Print Network [OSTI]

Estimating Use of Non-Motorized Infrastructure: Models of Bicycle and Pedestrian Traffic · Transportation managers lack data about use of bicycle and pedestrian facilities. · Federal, state, & local of Day Bicycle: Loop Detector Bicycle: Manual Count Pedestrian: Manual Count #12;Scaling factors

Minnesota, University of

350

BPA Metering Servicesź Editing and Estimating Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Editing and Estimating Interval Data 1. Introduction This section defines the meter interval data editing and estimation techniques performed by BPA's Metering Services...

351

Hydrogen Production Cost Estimate Using Biomass Gasification...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Production Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is...

352

Portfolio Selection with Robust Estimation  

E-Print Network [OSTI]

Department of Management Science and Operations, London Business School ... (1952). To implement these portfolios in practice, one has to estimate the mean and the covariance matrix of ... have good properties not only for the assumed distribution but also for any distribution in a ...... KNITRO user's manual. version 4.0.

2007-08-10T23:59:59.000Z

353

An Improved Cluster Richness Estimator  

SciTech Connect (OSTI)

Minimizing the scatter between cluster mass and accessible observables is an important goal for cluster cosmology. In this work, we introduce a new matched filter richness estimator, and test its performance using the maxBCG cluster catalog. Our new estimator significantly reduces the variance in the L{sub X}-richness relation, from {sigma}{sub lnL{sub X}}{sup 2} = (0.86 {+-} 0.02){sup 2} to {sigma}{sub lnL{sub X}}{sup 2} = (0.69 {+-} 0.02){sup 2}. Relative to the maxBCG richness estimate, it also removes the strong redshift dependence of the richness scaling relations, and is significantly more robust to photometric and redshift errors. These improvements are largely due to our more sophisticated treatment of galaxy color data. We also demonstrate the scatter in the L{sub X}-richness relation depends on the aperture used to estimate cluster richness, and introduce a novel approach for optimizing said aperture which can be easily generalized to other mass tracers.

Rozo, Eduardo; /Ohio State U.; Rykoff, Eli S.; /UC, Santa Barbara; Koester, Benjamin P.; /Chicago U. /KICP, Chicago; McKay, Timothy; /Michigan U.; Hao, Jiangang; /Michigan U.; Evrard, August; /Michigan U.; Wechsler, Risa H.; /SLAC; Hansen, Sarah; /Chicago U. /KICP, Chicago; Sheldon, Erin; /New York U.; Johnston, David; /Houston U.; Becker, Matthew R.; /Chicago U. /KICP, Chicago; Annis, James T.; /Fermilab; Bleem, Lindsey; /Chicago U.; Scranton, Ryan; /Pittsburgh U.

2009-08-03T23:59:59.000Z

354

HYPERPARAMETER ESTIMATION FOR EMISSION COMPUTED  

E-Print Network [OSTI]

HYPERPARAMETER ESTIMATION FOR EMISSION COMPUTED TOMOGRAPHY DATA A. López (a) , R. Molina (b) (a limited due to several factors. These factors include the need of greater computational time than to the projection data to obtain two-dimensional slices or cross sections (images) of activity distribution. #12

Granada, Universidad de

355

Current Direct Neutrino Mass Experiments  

E-Print Network [OSTI]

In this contribution we review the status and perspectives of direct neutrino mass experiments. These experiments investigate the kinematics of $\\beta$-decays of specific isotopes ($^3$H, $^{187}$Re, $^{163}$Ho) to derive model-independent information on the averaged electron (anti-) neutrino mass, which is formed by the incoherent sum of the neutrino mass eigenstates contributing to the electron neutrino. We first review the kinematics of $\\beta$-decay and the determination of the neutrino mass, before giving a brief overview of past neutrino mass measurements (SN1987a-ToF studies, Mainz and Troitsk experiments for $^3$H, cryo-bolometers for $^{187}$Re). We then describe the Karlsruhe Tritium Neutrino (KATRIN) experiment which is currently under construction at Karlsruhe Institute of Technology. The large-scale setup will use the MAC-E-Filter principle pioneered earlier to push the sensitivity down to a value of 200 meV(90% C.L.). KATRIN faces many technological challenges that have to be resolved with regar...

Drexlin, G; Mertens, S; Weinheimer, C

2013-01-01T23:59:59.000Z

356

Essay: Bob Siemann-SLC Days at SLAC  

SciTech Connect (OSTI)

Bob Siemann was a great experimentalist and an excellent teacher.We will greatly miss him. Bob came to SLAC in early 1991 to work on the Stanford Linear Collider (SLC). The SLC was a challenging accelerator which began operating in the late 1980's but still had numerous obstacles to be overcome years into operation. One of the compounding difficulties was making reproducible measurements, since the stability of the collider was poor and the diagnostics were insufficient. Bob dove into this challenge and helped design experiments and diagnostics that provided further clarity. I first got to know Bob while I was still a graduate student, trying to finish my thesis and performing some experimental studies on the SLC, which, at the time, was proving to be very difficult. Most of my expertise had been in beam theory and simulation. Dealing with the real issues of the accelerator was challenging. Bob helped me understand the difference between systematic and statistical errors, and separate operational issues from the fundamental physics. His way of teaching was not to provide an explanation but to ask enough questions so that I could find the answer on my own - this was the best way to learn. I later asked Bob to be a reader on my thesis. As in all things, he took this role extremely seriously. He read through the draft and marked every page to the point where I was regretting my decision. However, his questions again helped me understand my own work better and greatly improved my thesis. Bob was also the de facto leader of an effort focused on the damping rings and the bunch compressors. He was great to work with. He made people think for themselves and refused to simply provide answers. He also worked hard himself, expressing real interest and curiosity. After the studies of the SLC damping rings identified a sawtooth instability due to the vacuum chamber impedance as a source of many downstream fluctuations, Bob took charge of upgrading the rings. As part of this program, I suggested an extensive upgrade that also replaced the dipoles with combined function magnets which might have reduced the horizontal emittance another factor of 3. Although he was extremely busy, Bob helped me develop the proposal and understand the magnetic limitations as well as the potential impacts on the beam dynamics. He helped me consider issues well beyond my initial scope. While the proposal never went anywhere and I think Bob had been aware that there was no funding to pursue the option, he saw that it would be a great learning experience for me and it was. In the early 1990's I had simulated a new regime for the beam-ion instability and, with Frank Zimmermann, I developed a model for the effect which was predicted to occur within the high current, low emittance bunch trains in future storage rings or linear colliders. I thought this was pretty good work but Bob convinced me that the next step had to be confirming the theory with measurements. Because the growth rate was inversely dependent on beam sizes and proportional to the vacuum pressure, measurements required significantly increasing the vacuum pressure in existing facilities. Most people discounted trying such an experiment, but with Bob's urging and suggestions and John Byrd's excitement, we managed to make the measurements at the Advanced Light Source (ALS) at Berkeley. By the mid-1990's Bob was completely focused on advanced acceleration concepts and I was not interacting with him as often. At the time, SLAC was putting together a large effort in designing and documenting a design for the Next Linear Collider (NLC) while constructing the NLC Test Accelerator. Bob was worried that a straightforward extrapolation of the microwave technology would be difficult to bring to fruition because of the cost. He wanted to focus on more cost-effective approaches that could enable future accelerators for high energy physics. As usual, he was correct. The experimental programs that he started in direct laser acceleration and plasma-wakefield acceleration have made great progress. He accomplished

Raubenheimer, Tor O.; /SLAC

2011-11-14T23:59:59.000Z

357

Day-night asymmetry of high and low energy solar neutrino events in Super-Kamiokande and in the Sudbury Neutrino Observatory  

E-Print Network [OSTI]

In the context of solar neutrino oscillations among active states, we briefly discuss the current likelihood of Mikheyev-Smirnov-Wolfenstein (MSW) solutions to the solar neutrino problem, which appear to be currently favored at large mixing, where small Earth regeneration effects might still be observable in Super-Kamiokande (SK) and in the Sudbury Neutrino Observatory (SNO). We point out that, since such effects are larger at high (low) solar neutrino energies for high (low) values of the mass square difference \\delta m^2, it may be useful to split the night-day rate asymmetry in two separate energy ranges. We show that the difference \\Delta of the night-day asymmetry at high and low energy may help to discriminate the two large-mixing solutions at low and high \\delta m^2 through a sign test, both in SK and in SNO, provided that the sensitivity to \\Delta can reach the (sub)percent level.

G. L. Fogli; E. Lisi; D. Montanino; A. Palazzo

2000-09-19T23:59:59.000Z

358

Probability of detection models for eddy current NDE methods  

SciTech Connect (OSTI)

The development of probability of detection (POD) models for a variety of nondestructive evaluation (NDE) methods is motivated by a desire to quantify the variability introduced during the process of testing. Sources of variability involved in eddy current methods of NDE include those caused by variations in liftoff, material properties, probe canting angle, scan format, surface roughness and measurement noise. This thesis presents a comprehensive POD model for eddy current NDE. Eddy current methods of nondestructive testing are used widely in industry to inspect a variety of nonferromagnetic and ferromagnetic materials. The development of a comprehensive POD model is therefore of significant importance. The model incorporates several sources of variability characterized by a multivariate Gaussian distribution and employs finite element analysis to predict the signal distribution. The method of mixtures is then used for estimating optimal threshold values. The research demonstrates the use of a finite element model within a probabilistic framework to the spread in the measured signal for eddy current nondestructive methods. Using the signal distributions for various flaw sizes the POD curves for varying defect parameters have been computed. In contrast to experimental POD models, the cost of generating such curves is very low and complex defect shapes can be handled very easily. The results are also operator independent.

Rajesh, S.N.

1993-04-30T23:59:59.000Z

359

Chapter 11Chapter 11 Estimating the Weighted  

E-Print Network [OSTI]

Chapter 11Chapter 11 Estimating the Weighted Average Cost of Capital DES Chapter 11 1 #12;U i th C.xls for shortfor short. DES Chapter 11 2 #12;S i l i hSteps to estimate value using the Corporate Valuation stockholders DES Chapter 11 7 #12;Estimating Target Weights Page 223: To calculate WACC, we need to estimate

Schubart, Christoph

360

Best Linear Unbiased Estimate Motivation for BLUE  

E-Print Network [OSTI]

1 Chapter 6 Best Linear Unbiased Estimate (BLUE) #12;2 Motivation for BLUE Except for Linear Model to a sub-optimal estimate BLUE is one such sub-optimal estimate Idea for BLUE: 1. Restrict estimate) Advantage of BLUE:Needs only 1st and 2nd moments of PDF Mean & Covariance Disadvantages of BLUE: 1. Sub

Fowler, Mark

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

An Assessment of the Current Day Impact of Various Materials Associated with the U.S. Nuclear Test Program in the Marshall Island  

SciTech Connect (OSTI)

Different stable elements, and some natural and man-made radionuclides, were used as tracers or associated in other ways with nuclear devices that were detonated at Bikini and Enewetak Atolls as part of the U.S. nuclear testing program from 1946 through 1958. The question has been raised whether any of these materials dispersed by the explosions could be of sufficient concentration in either the marine environment or on the coral islands to be of a health concern to people living, or planning to live, on the atolls. This report addresses that concern. An inventory of the materials involved during the test period was prepared and provided to us by the Office of Defense Programs (DP) of the United States Department of Energy (DOE). The materials that the DOE and the Republic of the Marshall Islands (RMI) ask to be evaluated are--sulfur, arsenic, yttrium, tantalum, gold, rhodium, indium, tungsten, thallium, thorium-230,232 ({sup 230,232}Th), uranium-233,238 ({sup 233,238}U), polonium-210 ({sup 210}Po), curium-232 ({sup 232}Cu), and americium-241 ({sup 241}Am). The stable elements were used primarily as tracers for determining neutron energy and flux, and for other diagnostic purposes in the larger yield, multistage devices. It is reasonable to assume that these materials would be distributed in a similar manner as the fission products subsequent to detonation. A large inventory of fission product and uranium data was available for assessment. Detailed calculations show only a very small fraction of the fission products produced during the entire test series remain at the test site atolls. Consequently, based on the information provided, we conclude that the concentration of these materials in the atoll environment pose no adverse health effects to humans.

Robison, W L; Noshkin, V E; Hamilton, T F; Conrado, C L; Bogen, K T

2001-05-01T23:59:59.000Z

362

State Estimation 1.0 Introduction  

E-Print Network [OSTI]

also developed spot pricing, the precursor of modern-day locational marginal prices ­ LMPs ­ a central

McCalley, James D.

363

HIGH STABILITY CURRENT SUPPLY FOR ELECTRON MICROSCOPY  

E-Print Network [OSTI]

the current regulator. The power losses through the powerFETs are (31): Power Loss = I drain V ds The drain current (by design to lower the power loss is the drain to source

Motamedi, Maryam Melani

2012-01-01T23:59:59.000Z

364

Current DOE and OSHA VPP Sites  

Broader source: Energy.gov [DOE]

Need to know which sites are current DOE-VPP or OSHA VPP Sites? The link, below, will take you to a Voluntary Protection Programs Participant's Association web page where you may search for current...

365

Current ramp-up with lower hybrid current drive in EAST B. J. Ding,1  

E-Print Network [OSTI]

Current ramp-up with lower hybrid current drive in EAST B. J. Ding,1 M. H. Li,1 N. J. Fisch,2 H hybrid current drive. The first stage of cyclic operation would be to ramp up the plasma current with lower hybrid waves alone in low-density plasma. Such a current ramp-up was carried out successfully

366

Surface Currents and Winds at the Delaware Bay Mouth  

SciTech Connect (OSTI)

Knowledge of the circulation of estuaries and adjacent shelf waters has relied on hydrographic measurements, moorings, and local wind observations usually removed from the region of interest. Although these observations are certainly sufficient to identify major characteristics, they lack both spatial resolution and temporal coverage. High resolution synoptic observations are required to identify important coastal processes at smaller scales. Long observation periods are needed to properly sample low-frequency processes that may also be important. The introduction of high-frequency (HF) radar measurements and regional wind models for coastal studies is changing this situation. Here we analyze synoptic, high-resolution surface winds and currents in the Delaware Bay mouth over an eight-month period (October 2007 through May 2008). The surface currents were measured by two high-frequency radars while the surface winds were extracted from a data-assimilating regional wind model. To illustrate the utility of these monitoring tools we focus on two 45-day periods which previously were shown to present contrasting pictures of the circulation. One, the low-outflow period is from 1 October through 14 November 2007; the other is the high-outflow period from 3 March through 16 April 2008. The large-scale characteristics noted by previous workers are clearly corroborated. Specifically the M2 tide dominates the surface currents, and the Delaware Bay outflow plume is clearly evident in the low frequency currents. Several new aspects of the surface circulation were also identified. These include a map of the spatial variability of the M2 tide (validating an earlier model study), persistent low-frequency cross-mouth flow, and a rapid response of the surface currents to a changing wind field. However, strong wind episodes did not persist long enough to set up a sustained Ekman response.

Muscarella, P A; Barton, N P; Lipphardt, B L; Veron, D E; Wong, K C; Kirwan, A D

2011-04-06T23:59:59.000Z

367

Occupational dose estimates for a monitored retrievable storage facility  

SciTech Connect (OSTI)

Occupational doses were estimated for radiation workers at the monitored retrievable storage (MRS) facility. This study provides an estimate of the occupational dose based on the current MRS facility design, examines the extent that various design parameters and assumptions affect the dose estimates, and identifies the areas and activities where exposures can be reduced most effectively. Occupational doses were estimated for both the primary storage concept and the alternate storage concept. The dose estimates indicate the annual dose to all radiation workers will be below the 5 rem/yr federal dose equivalent limit. However, the estimated dose to most of the receiving and storage crew (the workers responsible for the receipt, storage, and surveillance of the spent fuel and its subsequent retrieval), to the crane maintenance technicians, and to the cold and remote maintenance technicians is above the design objective of 1 rem/yr. The highest annual dose is received by the riggers (4.7 rem) in the receiving and storage crew. An indication of the extent to which various design parameters and assumptions affect the dose estimates was obtained by changing various design-based assumptions such as work procedures, background dose rates in radiation zones, and the amount of fuel received and stored annually. The study indicated that a combination of remote operations, increased shielding, and additional personnel (for specific jobs) or changes in operating procedures will be necessary to reduce worker doses below 1.0 rem/yr. Operations that could be made at least partially remote include the removal and replacement of the tiedowns, impact limiters, and personnel barriers from the shipping casks and the removal or installation of the inner closure bolts. Reductions of the background dose rates in the receiving/shipping and the transfer/discharge areas may be accomplished with additional shielding.

Harty, R.; Stoetzel, G.A.

1986-06-01T23:59:59.000Z

368

Energy Current Correlations For Weakly Anharmonic Lattices  

E-Print Network [OSTI]

We discuss energy current correlations in thermal equilibrium and point out the linkage to the fluctuating Peierls equation.

Herbert Spohn

2007-06-06T23:59:59.000Z

369

High temperature superconducting fault current limiter  

DOE Patents [OSTI]

A fault current limiter for an electrical circuit is disclosed. The fault current limiter includes a high temperature superconductor in the electrical circuit. The high temperature superconductor is cooled below its critical temperature to maintain the superconducting electrical properties during operation as the fault current limiter. 15 figs.

Hull, J.R.

1997-02-04T23:59:59.000Z

370

Waves on unsteady currents Merrick C. Haller  

E-Print Network [OSTI]

Waves on unsteady currents Merrick C. Haller School of Civil and Construction Engineering, Oregon 2007; published online 3 December 2007 Models for surface gravity wave propagation in the presence of currents often assume the current field to be quasi-stationary, which implies that the absolute wave

Haller, Merrick

371

Aquantis Ocean Current Turbine Development Project Report  

SciTech Connect (OSTI)

The Aquantisģ Current Plane (ďC-PlaneĒ) technology developed by Dehlsen Associates, LLC (DA) and Aquantis, Inc. is an ocean current turbine designed to extract kinetic energy from ocean currents. The technology is capable of achieving competitively priced base-load, continuous, and reliable power generation from a source of renewable energy not before possible in this scale or form.

Fleming, Alex J.

2014-08-23T23:59:59.000Z

372

To estimate vapor pressure easily  

SciTech Connect (OSTI)

Vapor pressures as functions of temperature for approximately 700 major organic chemical compounds are given. The tabulation also gives the temperature range for which the data are applicable. Minimum and maximum temperatures are denoted by TMIN and TMAX. The Antoine equation that correlates vapor pressure as a function of temperature is described. A representative comparison of calculated and actual data values for vapor pressure is shown for ethyl alcohol. The coefficient tabulation is based on both literature (experimental data) and estimated values.

Yaws, C.L.; Yang, H.C. (Lamar Univ., Beaumont, TX (USA))

1989-10-01T23:59:59.000Z

373

autoregressive spectral estimation: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estimation: A Tunable High-Resolution Spectral Estimator CiteSeer Summary: Traditional maximum entropy spectral estimation determines a power spectrum from covariance estimates....

374

Estimation of methane and carbon dioxide surface fluxes using a 3-D global atmospheric chemical transport model  

E-Print Network [OSTI]

Methane (CH?) and carbon dioxide (CO?) are the two most radiatively important greenhouse gases attributable to human activity. Large uncertainties in their source and sink magnitudes currently exist. We estimate global ...

Chen, Yu-Han, 1973-

2004-01-01T23:59:59.000Z

375

Petroleum prices and profits in the 90 days following the invasion of Kuwait  

SciTech Connect (OSTI)

For the third in the past 20 years the world has experienced an interruption in the flow of oil from the Persian Gulf. The Iraqi invasion of Kuwait on August 2, 1990, and shut down of Kuwait oil production capacity followed by the United Nations boycott of Iraqi oil removed 8 percent of the world's oil supply. The result was a sharp increase in the process of crude oil and petroleum products. These events raised numerous questions about the performance of energy markets and energy firms. This report supplies a first answer for some of those questions. At the time this report was prepared the invasion has been in effect for 90 days. Not all the data is available to fully answer every question. Some issues can only be completely resolved after more time has passed in which the invasion and its effects have had an opportunity to be fully assimilated. This report was specifically requested by W. Henson Moore, Deputy Secretary of Energy as a way of supplying the American public with what could be said about the current situation. Rumors abound and mixconceptions have proliferated. This report strives to give a proper perspective on some of the more vexing issues which the invasion produced. The Energy Information Administration (EIA) has addressed many questions in this report. By the way of summary these are the 10 most most frequently asked questions and EIA's quick answers. The page references tell the reader where to look in the report for further explanation. These are not the only issues addressed and EIA hopes that readers will be able to satisfy their curiosity about their own questions within the pages of this report.

Not Available

1990-11-01T23:59:59.000Z

376

Benefits of Multi-day Industrial Center Assessments for Large Energy-Intensive Facilities  

E-Print Network [OSTI]

1 Benefits of Multi-day Industrial Center Assessments for Large Energy- Intensive Facilities1 Warren M. Heffington, Texas A&M University James A. Eggebrecht, Texas A&M University ABSTRACT Multi-day Industrial Assessment Center (IAC...) assessments are shown to be effective in serving the energy efficiency needs of large energy-intensive industrial facilities. Assessment results from two and three-day visits to eight large Industries of the Future (IOF) plants are discussed and compared...

Heffington, W.M.; Eggebrecht, J.A.

377

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

SciTech Connect (OSTI)

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

378

EEB 585 field course 2015: ITINERARY Day 1 May 15, 2015  

E-Print Network [OSTI]

in the Caribbean due to very dangerous riptides and sharks, and any student doing so will be sent home.) Day 7

Debinski, Diane M.

379

Irrigation timing: A quantitative analysis using the stress-day index.  

E-Print Network [OSTI]

, the stress-day index is defined as& SDI= CSxSD Hiler and Clark (1971) further described the stress-day i. ndex method and provided two means of determining the stress-day factor (SD). The SD is described as, ". . . . an indication of the crop water... evapotranspiration as computed from the Combination Method 26 * Table 3 Determination of SDI - an example of the method cue of computation Date CS SD bars SDI (CSxSD) SDI curn Day 1 , 25 . 25 6. 63 6, 79 1. 66 1. 70 1, 66 3. 36 . 25 6. 91 1. 73 5...

Boos, Roger Patrick

1972-01-01T23:59:59.000Z

380

Materials for Math 13900 Bring to class each day: graph paper ...  

E-Print Network [OSTI]

Materials for Math 13900. Bring to class each day: graph paper isometric dot paper unlined paper cm ruler. We will also be using: compass small scissors.

Roames, Renee S

2015-01-08T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

E-Print Network 3.0 - ambulatory day surgery Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

include but are not limited to incoming GDV, non-ambulatory... IVDD, trauma with fracture, recent ( <14 days) surgery case with complications (ie- incisional problem Source:...

382

NERSC Hosts HS Students on Job Shadow Day- NERSC Center News...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

facilitated by Jon Bashor of Computing Sciences and Jonathan Slack of the Environmental Energy Technologies Division, both of whom volunteered for the Job Shadow Day committee at...

383

Generalized space-charge limited current and virtual cathode behaviors in one-dimensional drift space  

SciTech Connect (OSTI)

This paper reports the space-charge limited current (SLC) and virtual cathode behaviors in one-dimensional grounded drift space. A simple general analytical solution and an approximate solution for the planar diode are given. Through a semi-analytical method, a general solution for SLC in one-dimensional drift space is obtained. The behaviors of virtual cathode in the drift space, including dominant frequency, electron transit time, position, and transmitted current, are yielded analytically. The relationship between the frequency of the virtual cathode oscillation and the injected current presented may explain previously reported numerical works. Results are significant in facilitating estimations and further analytical studies.

Yang, Zhanfeng; Liu, Guozhi [Key Laboratory for Physical Electronics and Devices of the Ministry of Education, Xi'an Jiaotong University, Xi'an 710049 (China) [Key Laboratory for Physical Electronics and Devices of the Ministry of Education, Xi'an Jiaotong University, Xi'an 710049 (China); Northwest Institute of Nuclear Technology, P.O. Box 69-13, Xi'an 710024 (China); Shao, Hao; Chen, Changhua; Sun, Jun [Northwest Institute of Nuclear Technology, P.O. Box 69-13, Xi'an 710024 (China)] [Northwest Institute of Nuclear Technology, P.O. Box 69-13, Xi'an 710024 (China)

2013-10-15T23:59:59.000Z

384

Mother's Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource ProgramModification andinterface1 EEnergy, Office ofMother nature

385

Father's Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy andExsolutionFES6FYRANDOMOverview The652 Please note

386

Graduation Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee, Retiree Resources

387

Lorraine Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6,Local CorrelationsConditions.LookingLori Ross

388

Memorial Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping theEnergy Storage Energy StoragePolicy, Guidance & Reports

389

Lorraine Day  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCentera A B C D ELong2009 LANL

390

Power links with Ireland -- Excitation of turbine-generator shaft torsional vibrations by variable frequency currents superimposed on DC currents in asynchronous HVDC links  

SciTech Connect (OSTI)

The paper describes an in-depth analysis of excitation of shaft torsional vibrations in steam-turbine-generator-exciter shafts in close proximity to HVDC converter stations by variable-frequency ripple currents superimposed on the DC currents in asynchronous Links. It extends earlier work to include an in depth analysis of system scaling factors for harmonic currents impressed on generators in Northern Ireland by an inverter and to investigate the phenomena for possible torsional vibrations in the generators by the Link. Frequencies at which shaft torsional vibrations would be excited by modulation product harmonics in 50Hz/50Hz asynchronous Links as a function of deviation in system frequency is reviewed. Relative noncharacteristic current levels for 50Hz/50Hz connectors are illustrated assuming ripple currents at the inverter which gives realistic harmonic voltages in a twelve-pulse bridge. The paper then shows that torques in machines in multi-machine networks may be estimated by proportioning HVDC link harmonic disturbance current appropriately to each machine at risk. It is concluded that variable-frequency ripple currents superimposed on the DC current in asynchronous links can excite sympathetic torsional vibrations in turbine-generator-exciter shafts.

Hammons, T.J.; Tay, B.W.; Kok, K.L. [Glasgow Univ. (United Kingdom)] [Glasgow Univ. (United Kingdom)

1995-08-01T23:59:59.000Z

391

654 IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, VOL. 18, NO. 3, MAY 2010 Model-Based Electrochemical Estimation and  

E-Print Network [OSTI]

in the literature. Accurate estimation of the battery's internal electrochemical state enables an expanded range governor, state-of-charge (SOC) estimation. I. INTRODUCTION MODEL-BASED battery monitoring algorithms theories, captures relevant solid-state and electrolyte diffusion dynamics and accurately predicts current

392

ESTIMATION OF ETHANOL CONTENT IN FLEX-FUEL VEHICLES USING AN EXHAUST GAS OXYGEN SENSOR: MODEL, TUNING AND SENSITIVITY  

E-Print Network [OSTI]

derivatives. Currently available flexible fuel vehicles (FFVs) can operate on a blend of gasoline and ethanol Estimated stoichiometric air-to-fuel ratio e Volume fraction of ethanol in gasoline-ethanol blend e Estimated volume fraction of ethanol in gasoline-ethanol blend Address all correspondence to annastef

Stefanopoulou, Anna

393

BLIND RT60 ESTIMATION ROBUST ACROSS ROOM SIZES AND SOURCE DISTANCES Baldwin Dumortier1,2,3  

E-Print Network [OSTI]

BLIND RT60 ESTIMATION ROBUST ACROSS ROOM SIZES AND SOURCE DISTANCES Baldwin Dumortier1 be blindly es- timated from a speech or music signal. Current methods often implicitly assume sound sources. This paper features two contributions. Firstly, we propose a blind RT60 estimation method

Paris-Sud XI, Universitť de

394

Helsinki Journal, Entry 29, February 18, 2007 Finland has a National Sledding Day, which was celebrated on Sunday. We went  

E-Print Network [OSTI]

Helsinki Journal, Entry 29, February 18, 2007 Finland has a National Sledding Day, which-conscious parents nervous. Helsinki's Paloheinä Hiuppu (Peak) on Finland's National Sledding Day. Sledding Day

Bardsley, John

395

Estimating the Bias of Local Polynomial Approximations Using the Peano Kernel  

SciTech Connect (OSTI)

These presentation visuals define local polynomial approximations, give formulas for bias and random components of the error, and express bias error in terms of the Peano kernel. They further derive constants that give figures of merit, and show the figures of merit for 3 common weighting functions. The Peano kernel theorem yields estimates for the bias error for local-polynomial-approximation smoothing that are superior in several ways to the error estimates in the current literature.

Blair, J., and Machorro, E.

2012-03-22T23:59:59.000Z

396

Using exploratory data analysis modified Box Plots to enhance Monte Carlo simulated Range Estimating Decision Technology  

E-Print Network [OSTI]

of the thesis is written with the intent of reviewing some of the significant pieces of literature relating to Monte Carlo simulated REDT and exploratory data analysis Box Plots. In 1964 David Hertz published an article in the Harvard Business Review... entitled, "Risk Analysis in Capital Investment" (Hertz 1964). While this article does not directly discuss range estimating, it is the foundation for the current REDT theory. In his atticle, Hertz discussed the problems associated with estimating...

Clutter, David John

1992-01-01T23:59:59.000Z

397

Mnoa Green Days Checklist for Buildings Being Closed Due to AC Shutdown  

E-Print Network [OSTI]

Mnoa Green Days Checklist for Buildings Being Closed Due to AC Shutdown The following Mnoa Green Days in which air conditioning to participating buildings will be shutdown over the weekends is a checklist for building occupants to use as a reference to successfully conserve energy during the Expanded

Wang, Yuqing

398

DAY VERSUS NIGHT ACTIVITY OF REEF FISHES IN A KELP FOREST OFF SANTA BARBARA, CALIFORNIA  

E-Print Network [OSTI]

DAY VERSUS NIGHT ACTIVITY OF REEF FISHES IN A KELP FOREST OFF SANTA BARBARA, CALIFORNIA ALFRED W. EBELING AND RICHARD N. BRAY! ABSTRACT Vertical distributions and feeding activities of residential kelp-bed fishes were compared between day and night in an area of reef and kelp off Santa Barbara, Calif

399

Intensely white bark on a dull winter's day AndreaKiewitt  

E-Print Network [OSTI]

- Intensely white bark on a dull winter's day ©AndreaKiewitt No. 45 January 2009 Eco birch (Betula utilis var. jacquemontii). On the grey winter day, its intensely white bark stood out revealing the strikingly white inner layers. The bark is strewn with creamy grey lenticels in the shape

400

A comparison of univariate methods for forecasting electricity demand up to a day ahead  

E-Print Network [OSTI]

A comparison of univariate methods for forecasting electricity demand up to a day ahead James W methods for short-term electricity demand forecasting for lead times up to a day ahead. The very short of Forecasters. Published by Elsevier B.V. All rights reserved. Keywords: Electricity demand forecasting

McSharry, Patrick E.

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

INTRODUCTION Modern day electronic systems such as communication systems, data handling  

E-Print Network [OSTI]

frame is time-of-year in binary coded decimal (BCD) notation in days, hours, minutes, seconds correlation with time. Parallel and serial formatted time codes are used to efficiently interface the timing system (time-of-day source) to the user system. Parallel time codes are defined in IRIG Standard 205

Berns, Hans-Gerd

402

NOAA GREAT LAKES COASTAL FORECASTING SYSTEM Forecasts (up to 5 days in the future)  

E-Print Network [OSTI]

conditions for up to 5 days in the future. These forecasts are run twice daily, and you can step through are generated every 6 hours and you can step backward in hourly increments to view conditions over the previousNOAA GREAT LAKES COASTAL FORECASTING SYSTEM Forecasts (up to 5 days in the future) and Nowcasts

403

AACR Cancer Progress Report 2012 Making Research Count for Patients: A New Day  

E-Print Network [OSTI]

AACR Cancer Progress Report 2012 Making Research Count for Patients: A New Day www.cancerprogressreport.org · www.aacr.org #12;AACR Cancer Progress Report 2012 Making Research Count for Patients: A New Day www.cancerprogressreport.org · www.aacr.org Also published as: American Association for Cancer Research. AACR cancer progress report

Sherman, S. Murray

404

2013 Minnesota Organic Dairy Day The University of Minnesota West Central Research and  

E-Print Network [OSTI]

and recyclable paper with at least 10 percent postconsumer waste material. #12;2013 Minnesota Organic Dairy Day The University of Minnesota West Central Research and Outreach Center's Organic Dairy Day will be held Tuesday, August 13, 2012, at Morris, MN from 10:00 am to 3:00 pm

Blanchette, Robert A.

405

The Two-Day CERC-BEE Forum on Building Integrated Design and Occupant Behavior  

E-Print Network [OSTI]

The Two-Day CERC-BEE Forum on Building Integrated Design and Occupant Behavior: Presentations and discussions at the two-day CERC-BEE Forum on Building Integrated Design and Occupant Behavior for High employer. #12;2013 CERC-BEE Forum on Human Behavior and Integrated Design for High Performance Buildings

406

Lightning strikes to tall objects: Currents inferred from far electromagnetic fields versus directly measured currents  

E-Print Network [OSTI]

-field-to-current conversion factor for lightning strikes to flat ground based on the transmission line model and (b currents on tall towers are used for testing the validity of field-to-current conversion equations [e on current measurement location (e.g., near the top or bottom of the tower) and on whether initial or largest

Florida, University of

407

Updated cost estimates of meeting geothermal hydrogen sulfide emission regulations  

SciTech Connect (OSTI)

A means of estimating the cost of hydrogen sulfide (H/sub 2/S) emission control was investigated. This study was designed to derive H/sub 2/S emission abatement cost functions and illustrate the cost of H/sub 2/S emission abatement at a hydrothermal site. Four tasks were undertaken: document the release of H/sub 2/S associated with geothermal development; review H/sub 2/S environmental standards; develop functional relationships that may be used to estimate the most cose-effective available H/sub 2/S abatement process; and use the cost functions to generate abatement cost estimates for a specific site. The conclusions and recommendations derived from the research are presented. The definition of the term impacts as used in this research is discussed and current estimates of the highest expected H/sub 2/S concentrations of in geothermal reservoirs are provided. Regulations governing H/sub 2/S emissions are reviewed and a review of H/sub 2/S control technology and a summary of the control cost functions are included. A case study is presented to illustrate H/sub 2/S abatement costs at the Baca KGRA in New Mexico.

Wells, K.D.; Currie, J.W.; Weakley, S.A.; Ballinger, M.Y.

1981-08-01T23:59:59.000Z

408

Customer reponse to day-ahead wholesale market electricity prices: Case study of RTP program experience in New York  

E-Print Network [OSTI]

Response to Day-ahead Wholesale Market Electricity Prices:Response to Day-ahead Wholesale Market Electricity Prices:Mitigating Price Spikes in Wholesale Markets through Market-

2004-01-01T23:59:59.000Z

409

Econometric Analysis on Efficiency of Estimator  

E-Print Network [OSTI]

This paper investigates the efficiency of an alternative to ratio estimator under the super population model with uncorrelated errors and a gamma-distributed auxiliary variable. Comparisons with usual ratio and unbiased estimators are also made.

M. Khoshnevisan; F. Kaymram; Housila P. Singh; Rajesh Singh; Florentin Smarandache

2003-04-16T23:59:59.000Z

410

Bayesian estimation of resistivities from seismic velocities†  

E-Print Network [OSTI]

I address the problem of finding a background model for the estimation of resistivities in the earth from controlled-source electromagnetic (CSEM) data by using seismic data and well logs as constraints. Estimation of ...

WerthmŁller, Dieter

2014-06-30T23:59:59.000Z

411

Hydrogen Production Cost Estimate Using Biomass Gasification  

E-Print Network [OSTI]

Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory% postconsumer waste #12;i Independent Review Panel Summary Report September 28, 2011 From: Independent Review Panel, Hydrogen Production Cost Estimate Using Biomass Gasification To: Mr. Mark Ruth, NREL, DOE

412

Current trends in the Advanced Bioindustry  

Broader source: Energy.gov [DOE]

Afternoon Plenary Session: Current Trends in the Advanced Bioindustry State of TechnologyóMichael McAdams, President, Advanced Biofuels Association

413

Tubular solid oxide fuel cell current collector  

DOE Patents [OSTI]

An internal current collector for use inside a tubular solid oxide fuel cell (TSOFC) electrode comprises a tubular coil spring disposed concentrically within a TSOFC electrode and in firm uniform tangential electrical contact with the electrode inner surface. The current collector maximizes the contact area between the current collector and the electrode. The current collector is made of a metal that is electrically conductive and able to survive under the operational conditions of the fuel cell, i.e., the cathode in air, and the anode in fuel such as hydrogen, CO, CO.sub.2, H.sub.2O or H.sub.2S.

Bischoff, Brian L. (Knoxville, TN); Sutton, Theodore G. (Kingston, TN); Armstrong, Timothy R. (Clinton, TN)

2010-07-20T23:59:59.000Z

414

Additional Guidance Regarding Application of Current Procedures...  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE...

415

Current Status of Concentrator Photovoltaic (CPV) Technology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(CPV) technology has recently entered the market as a utility- scale option for the generation of solar electricity. This report explores the current status of CPV technology...

416

Hybrid high direct current circuit interrupter  

DOE Patents [OSTI]

A device and a method are disclosed for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens. 7 figs.

Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

1998-08-11T23:59:59.000Z

417

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

418

Highly Automated Dipole EStimation , A. Pascarella2  

E-Print Network [OSTI]

filter, HADES (Highly Automatic Dipole EStimation). HADES is an open-source, freely downloadable, Matlab-based

Piana, Michele

419

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

∑ Types of Costs ∑ Types of Cost Estimates ∑ Methods to estimate capital costs MIN E 408: Mining% accuracy. ≠ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ≠ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships ∑ Capital Costs (or

Boisvert, Jeff

420

Arnold Schwarzenegger REFINING ESTIMATES OF WATER-  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor REFINING ESTIMATES OF WATER- RELATED ENERGY USE IN CALIFORNIA Energy Technologies · Transportation Refining Estimates of WaterRelated Energy Use in California is the final report for the Refining Estimates of EnergyRelated Energy Use in California project (contract

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transductive Reliability Estimation for Kernel Based Classifiers  

E-Print Network [OSTI]

Transductive Reliability Estimation for Kernel Based Classifiers Dimitris Tzikas1 , Matjaz Kukar2@cs.uoi.gr Abstract. Estimating the reliability of individual classifications is very important in several applications such as medical diagnosis. Recently, the transductive approach to reliability estimation has been

Likas, Aristidis

422

Statistical Exposure Estimation Spatial Confounding Bias  

E-Print Network [OSTI]

, and 3 Account for spatial correlation in the health outcome data. Applications include air pollution Epidemiology Estimates of chronic health effects of air pollution are identified from cross-sectional (i Exposure Estimation Methods for Air Pollution Often researchers estimate ambient concentrations and use

Paciorek, Chris

423

Registration General Info. Day 1 Sched. Day 2 Sched. Keynote Speaker Bios. Symposia Matrix Symposia Abstracts 14th Annual ARC Conference  

E-Print Network [OSTI]

Eaton Corporation Peter J. Savagian Director of Hybrid Powertrain Engineering GM Powertrain, General Motors Corporation Rani Finstad Global PT Director Manufacturing Design Simulation & Support, General Motors Corporation Question and Answer Session 11:45 - 1:15pm Lunch 14th Annual ARC Conference - Day 1

Papalambros, Panos

424

Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries  

SciTech Connect (OSTI)

Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner that allows evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study, conducted by Pacific Northwest Laboratory (PNL), developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key non-manufacturing sectors. This volume presents tabular and graphical results of the historical analysis and projections for each SIC industry. (JF)

Belzer, D.B. (Pacific Northwest Lab., Richland, WA (USA)); Serot, D.E. (D/E/S Research, Richland, WA (USA)); Kellogg, M.A. (ERCE, Inc., Portland, OR (USA))

1991-03-01T23:59:59.000Z

425

2007 Estimated International Energy Flows  

SciTech Connect (OSTI)

An energy flow chart or 'atlas' for 136 countries has been constructed from data maintained by the International Energy Agency (IEA) and estimates of energy use patterns for the year 2007. Approximately 490 exajoules (460 quadrillion BTU) of primary energy are used in aggregate by these countries each year. While the basic structure of the energy system is consistent from country to country, patterns of resource use and consumption vary. Energy can be visualized as it flows from resources (i.e. coal, petroleum, natural gas) through transformations such as electricity generation to end uses (i.e. residential, commercial, industrial, transportation). These flow patterns are visualized in this atlas of 136 country-level energy flow charts.

Smith, C A; Belles, R D; Simon, A J

2011-03-10T23:59:59.000Z

426

Supplemental report on cost estimates'  

SciTech Connect (OSTI)

The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

NONE

1992-04-29T23:59:59.000Z

427

Lithium-Ion battery State of Charge estimation with a Kalman Filter based on a electrochemical model  

E-Print Network [OSTI]

Lithium-Ion battery State of Charge estimation with a Kalman Filter based on a electrochemical state of charge (SOC). In this paper an averaged electrochemical Lithium-ion battery model suitable-Volmer current and the solid concentration at the interface with the electrolyte and (ii) the battery current

Stefanopoulou, Anna

428

Estimating the Bias of Local Polynomial Approximation Methods Using the Peano Kernel  

SciTech Connect (OSTI)

The determination of uncertainty of an estimate requires both the variance and the bias of the estimate. Calculating the variance of local polynomial approximation (LPA) estimates is straightforward. We present a method, using the Peano Kernel Theorem, to estimate the bias of LPA estimates and show how this can be used to optimize the LPA parameters in terms of the bias-variance tradeoff. Figures of merit are derived and values calculated for several common methods. The results in the literature are expanded by giving bias error bounds that are valid for all lengths of the smoothing interval, generalizing the currently available asymptotic results that are only valid in the limit as the length of this interval goes to zero.

Blair, J.; Machorro, E.; Luttman, A.

2013-03-01T23:59:59.000Z

429

Demonstration Integrated Knowledge-Based System for Estimating Human Error Probabilities  

SciTech Connect (OSTI)

Human Reliability Analysis (HRA) is currently comprised of at least 40 different methods that are used to analyze, predict, and evaluate human performance in probabilistic terms. Systematic HRAs allow analysts to examine human-machine relationships, identify error-likely situations, and provide estimates of relative frequencies for human errors on critical tasks, highlighting the most beneficial areas for system improvements. Unfortunately, each of HRA's methods has a different philosophical approach, thereby producing estimates of human error probabilities (HEPs) that area better or worse match to the error likely situation of interest. Poor selection of methodology, or the improper application of techniques can produce invalid HEP estimates, where that erroneous estimation of potential human failure could have potentially severe consequences in terms of the estimated occurrence of injury, death, and/or property damage.

Auflick, Jack L.

1999-04-21T23:59:59.000Z

430

The geometry of second-order statistics - biases in common estimators  

E-Print Network [OSTI]

Second-order measures, such as the two-point correlation function, are geometrical quantities describing the clustering properties of a point distribution. In this article well-known estimators for the correlation integral are reviewed and their relation to geometrical estimators for the two-point correlation function is put forward. Simulations illustrate the range of applicability of these estimators. The interpretation of the two-point correlation function as the excess of clustering with respect to Poisson distributed points has led to biases in common estimators. Comparing with the approximately unbiased geometrical estimators, we show how biases enter the estimators introduced by Davis and Peebles, Landy and Szalay, and Hamilton. We give recommendations for the application of the estimators, including details of the numerical implementation. The properties of the estimators of the correlation integral are illustrated in an application to a sample of IRAS galaxies. It is found that, due to the limitations of current galaxy catalogues in number and depth, no reliable determination of the correlation integral on large scales is possible. In the sample of IRAS galaxies considered, several estimators using different finite-size corrections yield different results on scales larger than 20 Mpc/h, while all of them agree on smaller scales.

Martin Kerscher

1998-11-19T23:59:59.000Z

431

A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory!  

E-Print Network [OSTI]

330 A PHOTOELECTRIC CURRENT METER Marine Biological Laboratory! WOODS HOLE, MASS. SPECIAL CURRENT METER by H. C. Boyar Fishery Research Biologist Bureau of Commercial Fisheries Biological. March 1960 #12;#12;TABLE OF CONTENTS Page Introduction 1 Description and operation of the meter

432

Neutral-current x-distributions  

SciTech Connect (OSTI)

The role of the semi-leptonic neutral current interaction as a probe of nucleon structure is examined. Previous measurements of neutral current x-distributions are reviewed, and new results from the Fermilab - MIT - MSU collaboration are presented. 4 references.

Bogert, D.; Burnstein, R.; Fisk, R.; Fuess, S.; Bofill, J.; Busza, W.; Eldridge, T.; Friedman, J.I.; Abolins, M.; Brock, R.

1984-06-01T23:59:59.000Z

433

An Introduction to Wave-Current Interactions  

E-Print Network [OSTI]

-scale wave focusing across a storm can re-direct the wind-stress? #12;1. Adiabatic interaction StartAn Introduction to Wave-Current Interactions Jerry Smith, MPL-SIO-UCSD jasmith@ucsd.edu http just want to hold up your hand. #12;Some Questions in Wave-Current Interaction Physics 1. Adiabatic

Smith, Jerome A.

434

How sustainable are current transport biofuels?  

E-Print Network [OSTI]

How sustainable are current transport biofuels? Jérémie Mercier 7th BIEE Academic Conference biofuels and what is expected from them? 2) Sustainability impacts of agrofuels and the UK certification Conference - Oxford 24th September 2008 1) What are current transport biofuels and what is expected from them

435

Metal current collect protected by oxide film  

DOE Patents [OSTI]

Provided are low-cost, mechanically strong, highly electronically conductive current collects and associated structures for solid-state electrochemical devices, techniques for forming these structures, and devices incorporating the structures. The invention provides solid state electrochemical devices having as current interconnects a ferritic steel felt or screen coated with a protective oxide film.

Jacobson, Craig P. (Lafayette, CA); Visco, Steven J. (Berkeley, CA); DeJonghe, Lutgard C. (Lafayette, CA)

2004-05-25T23:59:59.000Z

436

CURRENTS DRIVEN BY ELECTRON CYCLOTRON WAVES  

E-Print Network [OSTI]

CURRENTS DRIVEN BY ELECTRON CYCLOTRON WAVES C.F.F. KARNEY, NJ. FISCH Plasma Physics Laboratory of the generation of steady-state currents by electron cyclotron waves are explored. A numerical solution of electron cyclotron wave absorption appears to be one of the more promising schemes of providing a steady

Karney, Charles

437

Frontiers of biomedical text mining: current progress  

E-Print Network [OSTI]

Frontiers of biomedical text mining: current progress Pierre Zweigenbaum, Dina Demner-Fushman, Hong of biomedical text mining continue to present interesting challenges and opportunities for great improvements and interesting research. In this article we review the current state of the art in biomedical text mining or `Bio

Yu, Hong

438

Site characterization: a spatial estimation approach  

SciTech Connect (OSTI)

In this report the application of spatial estimation techniques or kriging to groundwater aquifers and geological borehole data is considered. The adequacy of these techniques to reliably develop contour maps from various data sets is investigated. The estimator is developed theoretically in a simplified fashion using vector-matrix calculus. The practice of spatial estimation is discussed and the estimator is then applied to two groundwater aquifer systems and used also to investigate geological formations from borehole data. It is shown that the estimator can provide reasonable results when designed properly.

Candy, J.V.; Mao, N.

1980-10-01T23:59:59.000Z

439

Electric field induced spin-polarized current  

DOE Patents [OSTI]

A device and a method for generating an electric-field-induced spin current are disclosed. A highly spin-polarized electric current is generated using a semiconductor structure and an applied electric field across the semiconductor structure. The semiconductor structure can be a hole-doped semiconductor having finite or zero bandgap or an undoped semiconductor of zero bandgap. In one embodiment, a device for injecting spin-polarized current into a current output terminal includes a semiconductor structure including first and second electrodes, along a first axis, receiving an applied electric field and a third electrode, along a direction perpendicular to the first axis, providing the spin-polarized current. The semiconductor structure includes a semiconductor material whose spin orbit coupling energy is greater than room temperature (300 Kelvin) times the Boltzmann constant. In one embodiment, the semiconductor structure is a hole-doped semiconductor structure, such as a p-type GaAs semiconductor layer.

Murakami, Shuichi; Nagaosa, Naoto; Zhang, Shoucheng

2006-05-02T23:59:59.000Z

440

Self-triggering superconducting fault current limiter  

DOE Patents [OSTI]

A modular and scaleable Matrix Fault Current Limiter (MFCL) that functions as a "variable impedance" device in an electric power network, using components made of superconducting and non-superconducting electrically conductive materials. The matrix fault current limiter comprises a fault current limiter module that includes a superconductor which is electrically coupled in parallel with a trigger coil, wherein the trigger coil is magnetically coupled to the superconductor. The current surge doing a fault within the electrical power network will cause the superconductor to transition to its resistive state and also generate a uniform magnetic field in the trigger coil and simultaneously limit the voltage developed across the superconductor. This results in fast and uniform quenching of the superconductors, significantly reduces the burnout risk associated with non-uniformity often existing within the volume of superconductor materials. The fault current limiter modules may be electrically coupled together to form various "n" (rows).times."m" (columns) matrix configurations.

Yuan, Xing (Albany, NY); Tekletsadik, Kasegn (Rexford, NY)

2008-10-21T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Stent-Grafts for Unruptured Abdominal Aortic Aneurysms: Current Status  

SciTech Connect (OSTI)

Aortic stent-grafts were introduced at the beginning of the 1990s as a less invasive method of dealing with aortic aneurysms in patients with poor cardiovascular reserve. The numbers of procedures performed worldwide has increased exponentially despite the current lack of any substantial evidence for long-term efficacy in comparison with the gold standard of open surgical grafting. This review summarizes the evolution of the abdominal aortic stent-graft, the techniques used for assessment and deployment, and the effect of the procedure on both the patient and the device. The recent publication of two national multicenter trials has confirmed that the endovascular technique confers a 2.5-fold reduction in 30-day mortality in comparison with open surgery. However, over 4 years of follow-up, there is a 3-fold increase in the risk of reintervention and the overall costs are 30% greater with endovascular repair. Although the improvement in aneurysm-related mortality persists in the mid-term, because of the initial reduction in perioperative mortality, the all-cause mortality rate at 4 years is actually no better than for open surgery. Longer-term data from the randomized trials are awaited as well as results from the latest trials utilizing state-of-the-art devices. Whilst the overall management of abdominal aortic aneurysms has undoubtedly benefited from the introduction of stent-grafts, open repair currently remains the gold standard treatment.

Rose, John [Freeman Hospital, Department of Interventional Radiology (United Kingdom)], E-mail: john.rose@nuth.nhs.uk

2006-06-15T23:59:59.000Z

442

Parameter estimation with Sandage-Loeb test  

E-Print Network [OSTI]

The Sandage-Loeb (SL) test directly measures the expansion rate of the universe in the redshift range of $2\\lesssim z\\lesssim 5$ by detecting redshift drift in the spectra of Lyman-$\\alpha$ forest of distant quasars. We discuss the impact of the future SL test data on parameter estimation for the $\\Lambda$CDM, the $w$CDM, and the $w_0w_a$CDM models. To avoid the potential inconsistency with other observational data, we take the best-fitting dark energy model constrained by the current observations as the fiducial model to produce 30 mock SL test data. The SL test data provide an important supplement to the other dark energy probes, since they are extremely helpful in breaking the existing parameter degeneracies. We show that the strong degeneracy between $\\Omega_m$ and $H_0$ in all the three dark energy models is well broken by the SL test. Compared to the current combined data of type Ia supernovae, baryon acoustic oscillation, cosmic microwave background, and Hubble constant, the 30-yr observation of SL test could improve the constraints on $\\Omega_m$ and $H_0$ by more than 60\\% for all the three models. But the SL test can only moderately improve the constraint on the equation of state of dark energy. We show that a 30-yr observation of SL test could help improve the constraint on constant $w$ by about 25\\%, and improve the constraints on $w_0$ and $w_a$ by about 20\\% and 15\\%, respectively. We also quantify the constraining power of the SL test in the future high-precision joint geometric constraints on dark energy. The mock future supernova and baryon acoustic oscillation data are simulated based on the space-based project JDEM. We find that the 30-yr observation of SL test would help improve the measurement precision of $\\Omega_m$, $H_0$, and $w_a$ by more than 70\\%, 20\\%, and 60\\%, respectively, for the $w_0w_a$CDM model.

Jia-Jia Geng; Jing-Fei Zhang; Xin Zhang

2014-11-28T23:59:59.000Z

443

current encounters a large island (main islands of Palau) basin-scale currents are driven by winds  

E-Print Network [OSTI]

Summary · current encounters a large island (main islands of Palau) · basin-scale currents are driven by winds · strong boundary currents like Gulf Stream · Palau has a boundary current · current

Johnston, Shaun

444

SMITHSONIAN MAGAZINE MUSEUM DAY The Florida Agricultural Museum will open its doors free of charge on September 27, 2014, from  

E-Print Network [OSTI]

SMITHSONIAN MAGAZINE MUSEUM DAY The Florida Agricultural Museum will open its doors free of charge on September 27, 2014, from 10 am - 3 pm, as part of Smithsonian magazine's 10th annual Museum Day Live! A nationwide event, Museum Day Live! offers free admission to visitors presenting a Museum Day Live! ticket

Florida, University of

445

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE  

SciTech Connect (OSTI)

This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

2011-06-22T23:59:59.000Z

446

By day, Luke MacDonald *10 (Civil and Environmental Engineering) is the  

E-Print Network [OSTI]

By day, Luke MacDonald *10 (Civil and Environmental Engineering) is the Assistant Director class Steering Committee and was an Annual Giving captain. Luke MacDonald *10 Alumni life is rich

Singh, Jaswinder Pal

447

Variable-base heating and cooling degree-day data for 24 Saudi Arabian cities  

SciTech Connect (OSTI)

Degree-day data are fundamental for simplified energy calculations. For Saudi Arabia the data necessary for simplified energy analysis are lacking, and the need of designers, engineers, and researchers in the building sector for such data as heating and cooling degree-days is growing. Weather data are available for many Saudi cities but not in a format usable by building designers and engineers. This paper presents variable-base heating and cooling degree-days is growing. Weather data are available for many Saudi cities but not in a format usable by building designers and engineers. This paper presents variable-base heating and cooling degree-day data for 24 Saudi locations based on long-term monthly average temperatures. These data will be of great help in performing simplified energy calculations for Saudi buildings.

Al-Homoud, M.S. [King Fahd Univ. of Petroleum and Minerals, Dhahran (Saudi Arabia). Dept. of Architectural Engineering

1998-12-31T23:59:59.000Z

448

U-245: Critical Java 0-day flaw exploited | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

the unsuspecting victims' machines REFERENCE LINKS: http:www.net-security.orgsecworld.php?id13484 zero-day CVE-2012-4681 DeepEnd Research http:www.oracle.comtechnetwork...

449

iManage Q&As Industry Day Aug 16 2012  

Broader source: Energy.gov (indexed) [DOE]

DE-SOL-0004498 Page 1 of 5 Listed below are the questions submitted by vendors attending the August 16, 2012 iManage Industry Day. All questions were submitted on 3...

450

Anti-Abortion Democrats, Jimmy Carter Republicans, and the Missing Leap Day Babies  

E-Print Network [OSTI]

#12;#12;#12;#12;Anti-Abortion Democrats, Jimmy Carter Republicans, and the Missing Leap Day Babies;#12;#12;#12;#12;Jimmy Carter Republicans and George W. Bush Democrats #12;#12;#12;#12;Birthdays: The beginning #12

Gelman, Andrew

451

Day Port Arrive Depart 6/29/13 Honolulu 7:00 PM  

E-Print Network [OSTI]

Itinerary Day Port Arrive Depart 6/29/13 Honolulu 7:00 PM 6/30/13 Kahului (Maui) 8:00 AM 7 on double occupancy and subject to availability. Port charges, taxes and gratuities are included. University

Tufts University

452

Predictability of ECMWF 5-day forecasts over the contiguous United States  

E-Print Network [OSTI]

PREDICTABILITY OF ECMWF 5-DAY FORECASTS OVER THE CONTIGUOUS UNITED STATES A Thesis by LEE SAMUEL NETTERVILLE Submitted to the Office of Graduate Studies of Texas AaM University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE December 1991 Major Subject: Meteorology PREDICTABILITY OF ECMWF 5-DAY FORECASTS OVER THE CONTIGUOUS UNITED STATES A Thesis by LEE SAMUEL NETTERVILLE Approved as to style and content by: Duson Djuric (Chair of Committee) pw...

Netterville, Lee Samuel

1991-01-01T23:59:59.000Z

453

Current Reversals and Synchronization in Coupled Ratchets  

E-Print Network [OSTI]

Current reversal is an intriguing phenomenon that has been central to recent experimental and theoretical investigations of transport based on ratchet mechanism. By considering a system of two interacting ratchets, we demonstrate how the coupling can be used to control the reversals. In particular, we find that current reversal that exists in a single driven ratchet system can ultimately be eliminated with the presence of a second ratchet. For specific coupling strengths a current-reversal free regime has been detected. Furthermore, in the fully synchronized state characterized by the coupling threshold $k_{th}$, a specific driving amplitude $a_{opt}$ is found for which the transport is optimum.

U. E. Vincent; A. Kenfack; D. V. Senthilkumar; D. Mayer; J. KŁrths

2010-09-26T23:59:59.000Z

454

Eddy current technique for predicting burst pressure  

DOE Patents [OSTI]

A signal processing technique which correlates eddy current inspection data from a tube having a critical tubing defect with a range of predicted burst pressures for the tube is provided. The method can directly correlate the raw eddy current inspection data representing the critical tubing defect with the range of burst pressures using a regression technique, preferably an artificial neural network. Alternatively, the technique deconvolves the raw eddy current inspection data into a set of undistorted signals, each of which represents a separate defect of the tube. The undistorted defect signal which represents the critical tubing defect is related to a range of burst pressures utilizing a regression technique.

Petri, Mark C. (Yorkville, IL); Kupperman, David S. (Oak Park, IL); Morman, James A. (Woodridge, IL); Reifman, Jaques (Western Springs, IL); Wei, Thomas Y. C. (Downers Grove, IL)

2003-01-01T23:59:59.000Z

455

Transformer current sensor for superconducting magnetic coils  

DOE Patents [OSTI]

The present invention is a current transformer for operating currents larger than 2kA (two kiloamps) that is capable of detecting a millivolt level resistive voltage in the presence of a large inductive voltage. Specifically, the present invention includes substantially cylindrical primary turns arranged to carry a primary current and substantially cylindrical secondary turns arranged coaxially with and only partially within the primary turns, the secondary turns including an active winding and a dummy winding, the active and dummy windings being coaxial, longitudinally separated and arranged to mutually cancel voltages excited by commonly experienced magnetic fields, the active winding but not the dummy winding being arranged within the primary turns.

Shen, S.S.; Wilson, C.T.

1985-04-16T23:59:59.000Z

456

$gl(4|4)$ current algebra: free field realization and screening currents  

E-Print Network [OSTI]

The $gl(4|4)$ current algebra at general level $k$ is investigated. Its free field representation and corresponding energy-momentum tensor are constructed. Seven screening currents of the first kind are also presented.

Wen-Li Yang; Yao-Zhong Zhang; Xin Liu

2008-05-26T23:59:59.000Z

457

Sensor Fish Characterization of Fish Passage Conditions through John Day Dam Spillbay 20 with a Modified Flow Deflector  

SciTech Connect (OSTI)

Fish passage conditions over a modified deflector in Spillbay 20 at John Day Dam were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objectives of the study were to describe and compare passage exposure conditions at two spill discharges, 2.4 and 4.0 thousand cubic feet per second (kcfs), identifying potential fish injury regions within the routes, and to evaluate a low-tailwater condition at the 2.4-kcfs discharge. The study was performed in April 2010 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events; 2) differences in passage conditions between treatments; and 3) relationships to live-fish injury and mortality data estimates. Nearly all Sensor Fish significant events were classified as collisions; the most severe occurred at the gate, on the spillbay chute, or at the deflector transition. Collisions in the gate region were observed only during the 2.4-kcfs discharge, when the tainter gate was open 1.2 ft. One shear event was observed during the evaluation, occurring at the deflector transition during passage at the 2.4-kcfs discharge at low tailwater. Flow quality, computed using the Sensor Fish turbulence index, was best for passage at the low-flow low-tailwater condition as well. The worst flow quality was observed for the 4.0-kcfs test condition. Contrasting the passage exposure conditions, the 2.4-kcfs low-tailwater treatment would be most deleterious to fish survival and well-being.

Duncan, Joanne P.

2011-04-29T23:59:59.000Z

458

Estimation of the dynamics of rumen water during the meal in sheep fed lucerne hay ad libitum  

E-Print Network [OSTI]

Estimation of the dynamics of rumen water during the meal in sheep fed lucerne hay ad libitum R-fistulated wethers had free access to lucerne hay for 6 h per day. They were dosed with 300 ml Cr-EDTA 2 h before

Paris-Sud XI, Université de

459

S:\\1Current Events\\CONV\\Who's Who List\\Marshals\\Instruc-faculty marshal.docx Ceremonies & Events Office  

E-Print Network [OSTI]

S:\\1Current Events\\CONV\\Who's Who List\\Marshals\\Instruc-faculty marshal.docx Ceremonies & Events MARSHAL _____________________________________________________________________________________ QUESTIONS-377-5084 For a list of Chief Marshals on convocation day, please refer back to: http://www.sfu.ca/convocation/faculty/marshals

Park, Edward

460

S:\\1Current Events\\CONV\\Who's Who List\\Marshals\\Instruc-grad marshal.docx Ceremonies & Events Office  

E-Print Network [OSTI]

S:\\1Current Events\\CONV\\Who's Who List\\Marshals\\Instruc-grad marshal.docx Ceremonies & Events MARSHAL _____________________________________________________________________________________ QUESTIONS-377-5084 For a list of Chief Marshals on convocation day, please refer back to: http://www.sfu.ca/convocation/faculty/marshals

Park, Edward

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Non-contact current and voltage sensor  

SciTech Connect (OSTI)

A detachable current and voltage sensor provides an isolated and convenient device to measure current passing through a conductor such as an AC branch circuit wire, as well as providing an indication of an electrostatic potential on the wire, which can be used to indicate the phase of the voltage on the wire, and optionally a magnitude of the voltage. The device includes a housing that contains the current and voltage sensors, which may be a ferrite cylinder with a hall effect sensor disposed in a gap along the circumference to measure current, or alternative a winding provided through the cylinder along its axis and a capacitive plate or wire disposed adjacent to, or within, the ferrite cylinder to provide the indication of the voltage.

Carpenter, Gary D; El-Essawy, Wael; Ferreira, Alexandre Peixoto; Keller, Thomas Walter; Rubio, Juan C; Schappert, Michael A

2014-03-25T23:59:59.000Z

462

Current Source Inverters for HEVs and FCVs  

Broader source: Energy.gov (indexed) [DOE]

weight for inverters. Currently, it contributes - Cost and weight, up to 23% of an inverter - Volume, up to 30% of an inverter * Ability of film capacitors to operate at higher...

463

Comparison of Current LCD Tracking Options  

E-Print Network [OSTI]

Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics for new S design (pattern recognition, resolution) S detector in real trouble at low angle w/out beam

California at Santa Cruz, University of

464

Comparison of Current LCD Tracking Options  

E-Print Network [OSTI]

Comparison of Current LCD Tracking Options Bruce Schumm Santa Cruz Institute for Particle Physics tracking somewhat more pressed for new S design (pattern recognition, ` resolution) S detector in real

California at Santa Cruz, University of

465

Current technologies and trends of aluminum design  

E-Print Network [OSTI]

A literature review of current aluminum technology in the building and construction industry was carried out. Aluminum is an ideal material for building in corrosive environments and for building structures where small ...

Chen, Michael, 1981-

2004-01-01T23:59:59.000Z

466

AGRICULTURE, 2003 Current Wisconsin Farm Financial Conditions  

E-Print Network [OSTI]

STATUS OF WISCONSIN AGRICULTURE, 2003 Current Wisconsin Farm Financial Conditions Situation and Challenges Department of Agricultural and Applied Economics College of Agricultural and Life Sciences OF WISCONSIN AGRICULTURE, 2003 An Annual Report by: Department of Agricultural and Applied Economics College

Radeloff, Volker C.

467

Current Mathematics Appears to Be Inconsistent  

E-Print Network [OSTI]

We show that some mathematical results and their negations are both deducible. The derived contradictions indicate the inconsistency of current mathematics. This paper is an updated version of arXiv:math/0606635v3 with additional results and proofs.

Guang-Liang Li; Victor O. K. Li

2006-06-25T23:59:59.000Z

468

On the Measured Current in Electrospinning  

E-Print Network [OSTI]

The origin and scaling of the current measured during steady electrospinning of polymer solutions in organic solvents are considered. For a specified electric field strength E, flow rate Q, and conductivity K, the total ...

Bhattacharjee, P. K.

469

Detecting topological currents in graphene superlattices  

E-Print Network [OSTI]

Topological materials may exhibit Hall-like currents flowing transversely to the applied electric field even in the absence of a magnetic field. In graphene superlattices, which have broken inversion symmetry, topological ...

Gorbachev, R. V.

470

Current TES Capabilities in TRNSYS (Presentation)  

SciTech Connect (OSTI)

This presentation includes: a brief overview of TRNSYS, a review of current SolarPaces models, potential of other models appropriate for CSP TES, and a review of a project proposal.

Price, H.; Blair, N.

2003-02-01T23:59:59.000Z

471

Transformer current sensor for superconducting magnetic coils  

DOE Patents [OSTI]

A transformer current sensor having primary turns carrying a primary current for a superconducting coil and secondary turns only partially arranged within the primary turns. The secondary turns include an active winding disposed within the primary turns and a dummy winding which is not disposed in the primary turns and so does not experience a magnetic field due to a flow of current in the primary turns. The active and dummy windings are wound in opposite directions or connected in series-bucking relationship, and are exposed to the same ambient magnetic field. Voltages which might otherwise develop in the active and dummy windings due to ambient magnetic fields thus cancel out. The resultant voltage is purely indicative of the rate of change of current flowing in the primary turns.

Shen, Stewart S. (Oak Ridge, TN); Wilson, C. Thomas (Norris, TN)

1988-01-01T23:59:59.000Z

472

Non-Stationary Spectral Estimation for Wind Turbine Induction Generator Faults Detection  

E-Print Network [OSTI]

- or indirect-drive, fixed- or variable-speed turbine generators, advanced signal processing tools are requiredNon-Stationary Spectral Estimation for Wind Turbine Induction Generator Faults Detection El Houssin- rine current turbine farms implies to minimize and predict maintenance operations. In direct

Paris-Sud XI, Université de

473

Uncalibrated Visual Compass from Omnidirectional Line Images with Application to Attitude MAV Estimation  

E-Print Network [OSTI]

algorithm based on previous results of the authors, for the estimation of the yaw angle as the ability to carry heavier pay- loads. Three categories of Micro-UAVs (or MAVs, for short) are currently represents a challenging re- search issue: in fact, while Vicon systems or overhead camera networks can

Siena, Università di

474

Stray currents -- Generation, interference effects and control  

SciTech Connect (OSTI)

Stray currents, mostly known for their detrimental corrosion affects on the underground structures, can be effectively controlled by the implementation of specific measures at both the source of generation and at the affected structure(s). This paper discusses the most serious sources of stray current generation, the resulting problems and the numerous control methods that can be utilized to minimize corrosion and safety problems. Safety concerns associated with dc power systems are also discussed.

Nikolakakos, S. [Raytheon Engineers and Constructors, Inc., Lyndhurst, NJ (United States)

1998-12-31T23:59:59.000Z

475

Heating and current drive systems for TPX  

SciTech Connect (OSTI)

The heating and current drive (H and CD) system proposed for the TPX tokamak will consist of ion cyclotron, neutral beam, and lower hybrid systems. It will have 17.5 MW of installed H and CD power initially, and can be upgraded to 45 MW. It will be used to explore advanced confinement and fully current-driven plasma regimes with pulse lengths of up to 1,000 s.

Swain, D.; Goranson, P. [Oak Ridge National Lab., TN (United States); Halle, A. von; Bernabei, S.; Greenough, N. [Princeton Univ., NJ (United States). Plasma Physics Lab.

1994-05-24T23:59:59.000Z

476

Conserved currents for Mobius Domain Wall Fermions  

E-Print Network [OSTI]

We derive the exactly conserved vector, and almost conserved axial currents for rational approximations to the overlap operator with a general Mobius kernel. The approach maintains manifest Hermiticity, and allows matrix elements of the currents to be constructed at no extra cost after solution of the usual 5d system of equations, similar to the original approach of Furman and Shamir for domain wall Fermions.

P. A. Boyle

2014-11-20T23:59:59.000Z

477

Satellite streamfunction analysis for the California current  

E-Print Network [OSTI]

SATELLITE STREAMFUNCTION ANALYSIS FOR THE CALIFORNIA CURRENT A Thesis by HERNAN GUILLERMO ARANGO Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August... 1987 Major Subject: Oceanography SATELLITE STREAMFUNCTION ANALYSIS FOR THE CALIFORNIA CURRENT A Thesis by HERNAN GUILLERMO ARANGO Approved as to style and content by Andrew C. Vastano (Chairman of Committee) Robert O. Reid (Member) Geor e L...

Arango, Hernan Guillermo

1987-01-01T23:59:59.000Z

478

A Superconducting transformer system for high current cable testing  

E-Print Network [OSTI]

A Superconducting Transformer System for High Current Cablea Direct-Current (DC) superconducting transformer system forhigh current test of superconducting cables. The transformer

Godeke, A.

2010-01-01T23:59:59.000Z

479

Entropy current for non-relativistic fluid  

E-Print Network [OSTI]

We study transport properties of a parity-odd, non-relativistic charged fluid in presence of background electric and magnetic fields. To obtain stress tensor and charged current for the non-relativistic system we start with the most generic relativistic fluid, living in one higher dimension and reduce the constituent equations along the light-cone direction. We also reduce the equation satisfied by the entropy current of the relativistic theory and obtain a consistent entropy current for the non-relativistic system (we call it "canonical form" of the entropy current). Demanding that the non-relativistic fluid satisfies the second law of thermodynamics we impose constraints on various first order transport coefficients. For parity even fluid, this is straight forward; it tells us positive definiteness of different transport coefficients like viscosity, thermal conductivity, electric conductivity etc. However for parity-odd fluid, canonical form of the entropy current fails to confirm the second law of thermodynamics. Therefore, we need to add two parity-odd vectors to the entropy current with arbitrary coefficients. Upon demanding the validity of second law, we see that one can fix these two coefficients exactly.

Nabamita Banerjee; Suvankar Dutta; Akash Jain; Dibakar Roychowdhury

2014-05-22T23:59:59.000Z

480

Reassessing Wind Potential Estimates for India: Economic and Policy Implications  

E-Print Network [OSTI]

the need to reassess wind potential estimates in India andDivision Reassessing Wind Potential Estimates for India:July 2011 Reassessing Wind Potential Estimates for India:

Phadke, Amol

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "day current estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Estimating Pedestrian Accident Exposure: Automated Pedestrian Counting Devices Report  

E-Print Network [OSTI]

291. Estimating Pedestrian Accident Exposure: Draft ProtocolEstimating Pedestrian Accident Exposure: Draft Protocol39. Estimating Pedestrian Accident Exposure: Draft Protocol

Bu, Fanping; Greene-Roesel, Ryan; Diogenes, Mara Chagas; Ragland, David R

2007-01-01T23:59:59.000Z

482

A robustness application for linear estimation  

E-Print Network [OSTI]

, recursive algorithm for yielding estimates of the state of a linear dynamic system (see, for example, the excellent tutorial [1]). Many other applications of this estimation scheme exist in the areas of signal processing, power systems, telecommunications... on robustness causes the coefficient which maximizes J to approach the coefficient which produces maximum robustness. 37 REFERENCES [1] I. B. Rhodes, "A Tutorial Introduction to Estimation and Filtering, "IEEE Trans. on Automatic Control, vol. AC-16, pp...

Kitzman, Kenneth Victor

1990-01-01T23:59:59.000Z

483

Estimating heat of combustion for waste materials  

SciTech Connect (OSTI)

Describes a method of estimating the heat of combustion of hydrocarbon waste (containing S,N,Q,C1) in various physical forms (vapor, liquid, solid, or mixtures) when the composition of the waste stream is known or can be estimated. Presents an equation for predicting the heat of combustion of hydrocarbons containing some sulfur. Shows how the method is convenient for estimating the heat of combustion of a waste profile as shown in a sample calculation.

Chang, Y.C.

1982-11-01T23:59:59.000Z

484

State energy data report 1994: Consumption estimates  

SciTech Connect (OSTI)

This document provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), operated by EIA. SEDS provides State energy consumption estimates to members of Congress, Federal and State agencies, and the general public, and provides the historical series needed for EIA`s energy models. Division is made for each energy type and end use sector. Nuclear electric power is included.

NONE

1996-10-01T23:59:59.000Z

485

Budget estimates. Fiscal year 1998  

SciTech Connect (OSTI)

The U.S. Congress has determined that the safe use of nuclear materials for peaceful purposes is a legitimate and important national goal. It has entrusted the Nuclear Regulatory Commission (NRC) with the primary Federal responsibility for achieving that goal. The NRC`s mission, therefore, is to regulate the Nation`s civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. The NRC`s FY 1998 budget requests new budget authority of $481,300,000 to be funded by two appropriations - one is the NRC`s Salaraies and Expenses appropriation for $476,500,000, and the other is NRC`s Office of Inspector General appropriation for $4,800,000. Of the funds appropriated to the NRC`s Salaries and Expenses, $17,000,000, shall be derived from the Nuclear Waste Fund and $2,000,000 shall be derived from general funds. The proposed FY 1998 appropriation legislation would also exempt the $2,000,000 for regulatory reviews and other assistance provided to the Department of Energy from the requirement that the NRC collect 100 percent of its budget from fees. The sums appropriated to the NRC`s Salaries and Expenses and NRC`s Office of Inspector General shall be reduced by the amount of revenues received during FY 1998 from licensing fees, inspection services, and other services and collections, so as to result in a final FY 1998 appropriation for the NRC of an estimated $19,000,000 - the amount appropriated from the Nuclear Waste Fund and from general funds. Revenues derived from enforcement actions shall be deposited to miscellaneous receipts of the Treasury.

NONE

1997-02-01T23:59:59.000Z

486

Electronic constant current and current pulse signal generator for nuclear instrumentation testing  

DOE Patents [OSTI]

Circuitry is described for testing the ability of an intermediate range nuclear instrument to detect and measure a constant current and a periodic current pulse. The invention simulates the resistance and capacitance of the signal connection of a nuclear instrument ion chamber detector and interconnecting cable. An LED flasher/oscillator illuminates an LED at a periodic rate established by a timing capacitor and circuitry internal to the flasher/oscillator. When the LED is on, a periodic current pulse is applied to the instrument. When the LED is off, a constant current is applied. An inductor opposes battery current flow when the LED is on. 1 figures.

Brown, R.A.

1994-04-19T23:59:59.000Z

487

Electronic constant current and current pulse signal generator for nuclear instrumentation testing  

DOE Patents [OSTI]

Circuitry for testing the ability of an intermediate range nuclear instrut to detect and measure a constant current and a periodic current pulse. The invention simulates the resistance and capacitance of the signal connection of a nuclear instrument ion chamber detector and interconnecting cable. An LED flasher/oscillator illuminates an LED at a periodic rate established by a timing capacitor and circuitry internal to the flasher/oscillator. When the LED is on, a periodic current pulse is applied to the instrument. When the LED is off, a constant current is applied. An inductor opposes battery current flow when the LED is on.

Brown, Roger A. (Amsterdam, NY)

1994-01-01T23:59:59.000Z

488

A LARGER ESTIMATE OF THE ENTROPY OF THE UNIVERSE  

SciTech Connect (OSTI)

Using recent measurements of the supermassive black hole (SMBH) mass function, we find that SMBHs are the largest contributor to the entropy of the observable universe, contributing at least an order of magnitude more entropy than previously estimated. The total entropy of the observable universe is correspondingly higher, and is S{sub obs} = 3.1{sup +3.0}{sub -1.7} x 10{sup 104} k. We calculate the entropy of the current cosmic event horizon to be S{sub CEH} = 2.6 +- 0.3 x 10{sup 122} k, dwarfing the entropy of its interior, S{sub CEH{sub int}} = 1.2{sup +1.1}{sub -0.7} x 10{sup 103} k. We make the first tentative estimate of the entropy of weakly interacting massive particle dark matter within the observable universe, S{sub dm} = 10{sup 88+}-{sup 1} k. We highlight several caveats pertaining to these estimates and make recommendations for future work.

Egan, Chas A. [Research School of Astronomy and Astrophysics, Australian National University, Canberra (Australia); Lineweaver, Charles H., E-mail: chas@mso.anu.edu.a [Planetary Science Institute, Research School of Astronomy and Astrophysics and Research School of Earth Sciences, Australian National University, Canberra (Australia)

2010-02-20T23:59:59.000Z

489

Estimating Temperature Distributions In Geothermal Areas Using...  

Open Energy Info (EERE)

neuronet temperature estimates based on well log data derive from: (a) the neuronet "education level" (which depends on the amount and structure of information used for teaching)...

490

Flux recovery and a posteriori error estimators  

E-Print Network [OSTI]

bility and the local efficiency bounds for this estimator are established provided that the ... For simple model problems, the energy norm of the true error is equal.

2010-05-20T23:59:59.000Z

491

Estimating Methods - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

direct costs, and other estimating considerations are discussed in this chapter. g4301-1chp15.pdf -- PDF Document, 28 KB Writer: John Makepeace Subjects: Administration Management...

492

Estimating Specialty Costs - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

493

Estimating Pedestrian Accident Exposure: Protocol Report  

E-Print Network [OSTI]

A Method of Measuring Exposure to Pedestrian Accident Risk.Accident Analysis and Prevention, Vol. 14, 1982, pp 397-405.Estimating Pedestrian Accident Exposure: Protocol Report,

Greene-Roesel, Ryan; Diogenes, Mara Chagas; Ragland, David R

2007-01-01T23:59:59.000Z

494

Electrochemical synthesis of nanosized hydroxyapatite by pulsed direct current method  

SciTech Connect (OSTI)

Synthesis of nanosized of hydroxyapatite (HA) by electrochemical pulsed direct current (PDC) method has been studied. The aim of this work is to study the influence of various PDC parameters (pH initial, electrode distance, duty cycle, frequency, and amplitude) on particle surface area of HA powders. The electrochemical synthesis was prepared in solution Ca{sup 2+}/EDTA{sup 4?}/PO{sub 4}{sup 3+} at concentration 0.25/0.25/0.15 M for 24 h. The electrochemical cell was consisted of two carbon rectangular electrodes connected to a function generator to produce PDC. There were two treatments for particles after electrosynthesized, namely without aging and aged for 2 days at 40 įC. For both cases, the particles were filtered and washed by demineralized water to eliminate the impurities and unreacted reactants. Then, the particles were dried at 100 įC for 2 days. The dried particles were characterized by X-ray diffraction, surface area analyzer, scanning electron microscopy (SEM), Fourier transform infrared spectra and thermogravimetric and differential thermal analysis. HA particles can be produced when the initial pH > 6. The aging process has significant effect on the produced HA particles. SEM images of HA particles showed that the powders consisted of agglomerates composed of fine crystallites and have morphology plate-like and sphere. The surface area of HA particles is in the range of 25 Ė 91 m{sup 2}/g. The largest particle surface area of HA was produced at 4 cm electrode distance, 80% cycle duty, frequency 0.1 Hz, amplitude 9 V and with aging process.

Nur, Adrian; Rahmawati, Alifah; Ilmi, Noor Izzati; Affandi, Samsudin; Widjaja, Arief [Departement of Chemical Engineering, Faculty of Industrial Technology, Sepuluh Nopember Institute of Technology, Kampus ITS Sukolilo, Surabaya 60111 (Indonesia)

2014-02-24T23:59:59.000Z

495

Optimization of Concurrent Deployments of the Juvenile Salmon Acoustic Telemetry System and Other Hydroacoustic Equipment at John Day Dam  

SciTech Connect (OSTI)

The purpose of this report is to document the results of the acoustic optimization study conducted at John Day Dam during January and February 2008. The goal of the study was to optimize performance of the Juvenile Salmon Acoustic Telemetry System (JSATS) by determining deployment and data acquisition methods to minimize electrical and acoustic interference from various other acoustic sampling devices. Thereby, this would allow concurrent sampling by active and passive acoustic methods during the formal evaluations of the prototype surface flow outlets at the dam during spring and summer outmigration seasons for juvenile salmonids. The objectives for the optimization study at John Day Dam were to: 1. Design and test prototypes and provide a total needs list of pipes and trolleys to deploy JSATS hydrophones on the forebay face of the powerhouse and spillway. 2. Assess the effect on mean percentage decoded of JSATS transmissions from tags arrayed in the forebay and detected on the hydrophones by comparing: turbine unit OFF vs. ON; spill bay OPEN vs. CLOSED; dual frequency identification sonar (DIDSON) and acoustic Doppler current profiler (ADCP) both OFF vs. ON at a spill bay; and, fixed-aspect hydroacoustic system OFF vs. ON at a turbine unit and a spill bay. 3. Determine the relationship between fixed-aspect hydroacoustic transmit level and mean percentage of JSATS transmissions decoded. The general approach was to use hydrophones to listen for transmissions from JSATS tags deployed in vertical arrays in a series perpendicular to the face of the dam. We used acoustic telemetry equipment manufactured by Technologic and Sonic Concepts. In addition, we assessed old and new JSATS signal detectors and decoders and two different types of hydrophone baffling. The optimization study consisted of a suite of off/on tests. The primary response variable was mean percentage of tag transmissions decoded. We found that there was no appreciable adverse effect on mean percentage decoded for JSATS transmitters from: turbine operations; spillway operations; DIDSON/ADCP acoustic energy; and PAS hydroacoustic systems at transmit level of -12 dB, although there was a significant impact at all higher transmit levels (-11 to -6 dB). The main conclusion from this optimization study is that valid JSATS telemetry data can be collected simultaneously with a DIDSON/ADCP and a PAS hydroacoustic system at transmit level -12 dB. Multiple evaluation tools should be considered to increase the robustness and thoroughness of future fish passage evaluations at John Day and other dams.

Ploskey, Gene R.; Hughes, James S.; Khan, Fenton; Kim, Jina; Lamarche, Brian L.; Johnson, Gary E.; Choi, Eric Y.; Faber, Derrek M.; Wilberding, Matthew C.; Deng, Zhiqun; Weiland, Mark A.; Zimmerman, Shon A.; Fischer, Eric S.; Cushing, Aaron W.

2008-09-01T23:59:59.000Z

496

Coherent Effects of High Current Beam in Project-X Linac  

SciTech Connect (OSTI)

Resonance excitation of longitudinal high order modes in superconducting RF structures of Project-X continuous wave linac is studied. We analyze regimes of operation of the linac with high beam current, which can be used to provide an intense muon source for the future Neutrino Factory or Muon Collider, and also important for the Accelerator-Driven Subcritical systems. We calculate power loss and associated heat load to the cryogenic system. Longitudinal emittance growth is estimated. We consider an alternative design of the elliptical cavity for the high energy part of the linac, which is more suitable for high current operation.

Sukhanov, A.; Lunin, A.; Yakovlev, V.; Gonin, I.; Khabiboulline, T.; Saini, A.; Solyak, N.; Yostrikov, A.

2012-09-01T23:59:59.000Z

497

RXTE/ASM Observations of the 35-day Cycle of Her X-1  

E-Print Network [OSTI]

Her X-1 has been monitored nearly continuously in soft X-rays (2-12 keV) since February 1996 by the ASM on board RXTE. We present analysis of these observations which include 23 contiguous 35-day cycles. We present the best yet average 35-day cycle lightcurve for Her X-1. 35-day lightcurve features such as eclipses and absorption dips, and the alternating occurrence of the Main High and Short High states, are well measured. The occurrence of X-ray eclipse during the Low state is confirmed as is the presence of Main High states that ``turn-on'' sharply at orbital phases 0.23 and 0.68. The Main High state covers 35-day phase 0-0.31 and the Short High state covers phase 0.57-0.79, with phase 0 defined by Main High state turn-on. We find extended ingresses and egresses for the Short High state. Marching pre-eclipse absorption dips progressively become shallower during the Main High state. The marching pre-eclipse dip period is best determined from reanalysis of archival data as 1.651 +/- .002 days if the dip marching can be extrapolated from the Main High state into the Short High state or 1.646 +/- .003 using dips within single Main High states alone.

D. Matthew Scott Denis A. Leahy

1998-09-11T23:59:59.000Z

498

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

499

Essays on Nonparametric Series Estimation with Application to Financial Econometrics  

E-Print Network [OSTI]

This dissertation includes two essays. In the first essay, I proposed an alternative estimator for multivariate densities. This estimator can be characterized as a transformation based estimator. The first stage estimates each marginal density...

Chang, Meng-Shiuh

2012-10-19T23:59:59.000Z

500

Technical Review of the CENWP Computational Fluid Dynamics Model of the John Day Dam Forebay  

SciTech Connect (OSTI)

The US Army Corps of Engineers Portland District (CENWP) has developed a computational fluid dynamics (CFD) model of the John Day forebay on the Columbia River to aid in the development and design of alternatives to improve juvenile salmon passage at the John Day Project. At the request of CENWP, Pacific Northwest National Laboratory (PNNL) Hydrology Group has conducted a technical review of CENWP's CFD model run in CFD solver software, STAR-CD. PNNL has extensive experience developing and applying 3D CFD models run in STAR-CD for Columbia River hydroelectric projects. The John Day forebay model developed by CENWP is adequately configured and validated. The model is ready for use simulating forebay hydraulics for structural and operational alternatives. The approach and method are sound, however CENWP has identified some improvements that need to be made for future models and for modifications to this existing model.

Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

2010-12-01T23:59:59.000Z