Powered by Deep Web Technologies
Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Ohio Nuclear Profile - Davis Besse  

U.S. Energy Information Administration (EIA) Indexed Site

Davis Besse" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

2

Davis-Besse Cycle 16 Fuel Deposit Analysis and Characterization  

Science Conference Proceedings (OSTI)

Fuel deposit samples were collected from Davis-Besse Unit 1 during the EOC16 outage. The impetus behind collecting crud samples came from the observation of unusual deposits on fuel during EOC15, as well as measured crud-induced power shape (CIPS) during Cycle 16. The purpose of EOC16 sample campaign therefore was to determine the nature of the fuel deposits. Samples were collected from two fuel assemblies, one after one cycle of exposure and the other after two cycles of exposure. Samples were collected...

2011-12-23T23:59:59.000Z

3

Testing and Evaluation of a Moisture Separator Drain Demineralizer at Davis-Besse Nuclear Station  

Science Conference Proceedings (OSTI)

Davis-Besse plant data show that by polishing 15-20 percent of the moisture separator drains, the entire flow from the drains can be pumped forward, increasing plant power output significantly. In addition, this process extended the useful lifetime of condensate polishers by a factor of about 6, reducing resin replacement costs by approximately $450,000/yr. Information obtained can be applied to all once-through steam generator PWRs.

1994-04-01T23:59:59.000Z

4

Three Mile Island-1, Crystal River-3, and Davis-Besse Fuel Crud Observations Assessment and Root Cause  

Science Conference Proceedings (OSTI)

This report shares information pertaining to elevated crud observed on fuel at Babcock Wilcox (BW) plants Crystal River-3, Davis-Besse, and Three Mile Island-1 and the subsequent causal investigation performed by AREVA, Inc. Discussion of industry operating experience, effects of crud, fuel inspection results, and preventive and corrective actions in future operating cycles are also included.

2011-10-26T23:59:59.000Z

5

September 10, 2003, Board Public Meeting - Nuclear Regulatory Commission - Davis-Besse Lessons Learned  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 6 7 8 9 10 11 12 13 14 15 16 I 17 18 19 20 21 22 24 25 101 inspector to a senior, and then they'll move to another facility, but seven years is the maximum, and that's written in our policy. CHAIRMAN CONWAY: Thank you. Dr. Hackett. DR. HACKETT: Thank you, Mr. Chairman. I have a different challenge today, which is to try and help walk you through a story that's very important to us in the nuclear industry. In general, it dovetails with what Russ and Cindy had been talking about. The thing I'll add on this slide is that during the timeframe from May to October 2002, I was Assistant Team Leader for the NRC's Davis-Besse Lessons Learned Task Force. That's the role in which I'll be presenting this information to you. As you've been doing, I think I found that these work most

6

Tiffany Perry  

Science Conference Proceedings (OSTI)

Technical Program for meetings. Tiffany Perry Contact Information contact contact us Tiffany Perry Technical Program Coordinator ...

7

Dale Perry  

NLE Websites -- All DOE Office Websites (Extended Search)

Not Available Dale Perry Laser Technologies Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 70-1150 Berkeley CA 94720 Office Location: 70-0111E (510) 486-4819...

8

Dale Perry  

NLE Websites -- All DOE Office Websites (Extended Search)

Not Available Not Available Dale Perry Laser Technologies Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 70-1150 Berkeley CA 94720 Office Location: 70-0111E (510) 486-4819 DLPerry@lbl.gov This publications database is an ongoing project, and not all Division publications are represented here yet. Publications 1997 Perry, Dale L., Albert C. Thompson, Richard E. Russo, Xianglei Mao, and Karen L. Chapman. "Characterization of quaternary metal oxide films by synchrotron X-ray fluorescence microprobe." Applied Spectroscopy 51, no. 12 (1997): 1781-1783. 1995 Mao, Xianglei, Dale L. Perry, and Richard E. Russo. "Thin films of Calcium-Nickel-Potassium oxide fabricated by pulsed laser deposition." High Temperature and Materials Science 33 (1995): 117-123.

9

Ohio Nuclear Profile - Perry  

U.S. Energy Information Administration (EIA) Indexed Site

Perry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

10

William Perry | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

William Perry William Perry About Us William Perry - Former Secretary of Defense, Stanford University Professor Photo of William Perry William Perry is the Michael and Barbara Berberian Professor (emeritus) at Stanford University. He is a senior fellow at FSI and serves as co-director of the Nuclear Risk Reduction initiative and the Preventive Defense Project. He is an expert in U.S. foreign policy, national security and arms control. He was the co-director of CISAC from 1988 to 1993, during which time he was also a professor (half time) at Stanford. He was a part-time lecturer in the Department of Mathematics at Santa Clara University from 1971 to 1977. Perry was the 19th Secretary of Defense for the United States, serving from February 1994 to January 1997. He previously served as Deputy Secretary of

11

Perry Safety Book for Web  

NLE Websites -- All DOE Office Websites (Extended Search)

Before using this product, read, understand Before using this product, read, understand and follow the Assembly and Safe Use Instruc- tions. Save this document for future reference. It contains important safety information! Fail- ure to properly assemble may lead to improper usage, potential injury or property damage. Instructions for the Assembly and Safe Use of Perry Scaffolds and Scaffold Towers Perry Manufacturing Inc. 1233 W. 18th Street. Indianapolis, Indiana 46202 USA USA (800) 428-7200 Fax (317) 231-9161 International (317) 231-9037 PN 7537 July, 1999 Prefabricated Mobile Interior Scaffolds February 2006 (ELITE AND CLASSIC SERIES ONLY) 2 Table of Contents PERRY SCAFFOLDS ARE CLASSIFIED AS TO CAPACITY ONLY Topic Page Inspection and Maintenance 3 Safe Use 4 Assembly of the Basic Perry Mobile Interior Scaffold

12

State Energy Program Assurances - Texas Governor Perry | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program Assurances - Texas Governor Perry State Energy Program Assurances - Texas Governor Perry Letter from Texas Governor Perry providing Secretary Chu with the...

13

Perry, Utah: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon Perry, Utah: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates...

14

Microsoft PowerPoint - Perry.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Congestion Study Western Interconnection Spring 2009 Technical Workshop U.S. DOE 2009 Congestion Study Dean Perry Western Interconnection Transmission Paths 2 BUCKLEY SUNDANCE FT. PECK PEACE CANYON MICA VANCOUVER SEATTLE PRINCE RUPERT AREA AREA COLSTRIP BOISE PORTLAND AREA MALIN TABLE MTN ROUND MTN SALT LAKE CITY AREA MEXICO EL PASO AREA DEVERS LUGO SAN FRANCISCO MIDPOINT AREA LOS ANGELES AREA ALBUQUERQUE AREA NAVAJO DENVER AREA MOJAVE HOOVER PHOENIX AREA LANGDON HOT SPRINGS HELLS CANYON CHIEF JOSEPH BURNS PINTO FOUR CORNERS SHASTA LANGDON CANADA UNITED STATES 66 65 14 8 30 49 31 19 22 34 47 3 35 18 17 20 23 36 45 46 50 51 4 8 48 Data Analyzed ● Actual Power Flow - Hourly samples ● Path Transfer Limits - Hourly samples ● Path Schedules - from electronic scheduling tags - OATI Hourly Firm & Non-firm Net Schedule and schedules in both path directions

15

Perry County, Arkansas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Perry County, Arkansas: Energy Resources Perry County, Arkansas: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 34.96032°, -92.8976254° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.96032,"lon":-92.8976254,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

16

RICK PERRY GOVERNOR The Honorable Steven Chu Secretary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RICK PERRY RICK PERRY GOVERNOR The Honorable Steven Chu Secretary March 23,2009 U2$. Departmgnt of E m (DOE) - - 1000 Independence Avenue, S. W: Washington, D.C. 20585 Dear Secretary Chu: Section 410 of the American Recovery and Renewal Act of 2009 (H.R. l)(ARRA) requires governors to notify the Secretary of Energy that certain policies will be implemented in order for the state to receive an allocation of additional h d s for the Federal State Energy Program (SEP). As discussed below, current Texas state law already provides for the policies referenced in the act, and as such, the additional SEP h d s should be released to Texas without any further commitment by Texas to adopt policy changes. With respect to a "general policy that ensures that utility financial incentives are aligned with helping

17

City of Perry, Oklahoma (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Oklahoma Oklahoma Utility Id 14829 Utility Location Yes Ownership M NERC Location SPP NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Electric Commercial Large Industrial Industrial Medium Industrial Industrial Medium Industrial- Time-of-Use Industrial Perry Municipal Airport Commercial Residential Residential Residential- All-Electric Residential Rural- All-Electric Residential Security Lighting- 1000W Lighting Security Lighting- 100W High Pressure Sodium Lighting Security Lighting- 15W Mercury Vapor Lighting Security Lighting- 175W Metal Halide Lighting

18

Liquid piston gas compression James D. Van de Ven a,*, Perry Y. Li b,1  

E-Print Network (OSTI)

Liquid piston gas compression James D. Van de Ven a,*, Perry Y. Li b,1 a Worcester Polytechnic piston Gas compression Air compressor Compression efficiency a b s t r a c t A liquid piston concept is proposed to improve the efficiency of gas compression and expansion. Because a liquid can conform

Li, Perry Y.

19

Products and Markets for Small Louisiana Shrimp PERRY W. PAWLYK and KENNETH J. ROBERTS  

E-Print Network (OSTI)

, with the Office of Sea Grant Development, Center for Wetland Resources, Louisiana State University, Baton Rouge Louisiana. The loss of plants in such depressed areas would have much more serious conse- quencesProducts and Markets for Small Louisiana Shrimp PERRY W. PAWLYK and KENNETH J. ROBERTS Introduction

20

Microsoft PowerPoint - Perry-URTAC Meeting-09-19-2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WebEx Meeting WebEx Meeting Thursday, September 19, 2013 RPSEA Onshore Program Overview and Research Highlights rpsea.org Kent F. Perry rpsea.org 2 Mission & Goals * Small Producer Mission & Goals - Increase supply from mature resources * Reduce cost * Increase efficiency * Improve safety * Minimize environmental impact o Unconventional Gas Mission & Goal * Economically viable technologies to allow environmentally acceptable development of unconventional gas resources Gas Shales Tight Sands Coalbed Methane 3 Environmental Issues > Hydraulic Fracturing > Land Use > Air Emissions > Water Usage > Water Quality > Traffic > Road Damage > Noise > Wildlife > Image Deficit 4 U.S Gas Production U.S Gas Production 4 5 Onshore Projects Unconventional Resources Small Producers 60 Projects

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Assignment #1: Developing Algorithms  

E-Print Network (OSTI)

The purpose of this assignment is to give you some experience developing algorithms. According to Wikipedia, an algorithm is a finite list of well-defined instructions for accomplishing some task that, given an initial state, will terminate in a defined end-state [1]. 1. Consider the following initial state: A bag containing sliced bread A jar containing peanut butter A jar containing jelly A plastic knife Develop an algorithm for producing, as an end-state, a peanut butter and jelly sandwich. Be as precise as possible when developing your list of instructions. 2 Hand-In Instructions The assignment is due at the start of class on August 27 th. You are required to turn in a typed document. The document should include your name, your username, the date, the course number, and the assignment number. For example:

Andrew R. Dalton; Andy Dalton (adalton

2007-01-01T23:59:59.000Z

22

Overseas Assignments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

assignments; assignments to embassies, international organizations, including cost-free experts with the International Atomic Energy Agency (IAEA), and the Department of...

23

Handbook on Overseas Assignments  

Energy.gov (U.S. Department of Energy (DOE))

This handbook covers all types of Federal employment overseas, including details, both within DOE as well as to other agencies; transfers to approved international organizations; assignments to permanent DOE positions; cost-free experts; and personal services agreements (PSAs). This handbook contains information, guidance, sample service agreements, and related documentation that are to be used to implement the departments directives.

24

Perry County  

E-Print Network (OSTI)

Jr. , who believes that the coal ash is the town's only hopeand explore the history of coal ash regulation in the Unitedcarrying 8,500 tons of toxic coal ash to the local Arrowhead

Durning, Matt; Eaton, N'Jeri

2010-01-01T23:59:59.000Z

25

Perry Sioshansi  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Energy Decisions (GED), now called Ventyx.His recent edited books include Electricity Market Reform: An International Perspective (2006), Competitive Electricity...

26

Microsoft Word - CX_PerryCreek_4.29.11.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Cecilia Brown Project Manager - KEWM-4 Proposed Action: Provision of funds to Montana Fish, Wildlife and Parks for purchase of the Perry Creek Property. Fish and Wildlife Project No.: 2008-800-00, Contract 45235 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.25 Transfer, lease, disposition or acquisition of interests in uncontaminated land for habitat preservation or wildlife management, and only associated buildings that support these purposes. Uncontaminated means that there would be no potential for release of substances at a level, or in a form, that would pose a threat to public health or the environment. Location: Township 24 North, Range 17 West, Section 31, Lake County, Montana

27

Truthful Assignment without Money  

E-Print Network (OSTI)

We study the design of truthful mechanisms that do not use payments for the generalized assignment problem (GAP) and its variants. An instance of the GAP consists of a bipartite graph with jobs on one side and machines on the other. Machines have capacities and edges have values and sizes; the goal is to construct a welfare maximizing feasible assignment. In our model of private valuations, motivated by impossibility results, the value and sizes on all job-machine pairs are public information; however, whether an edge exists or not in the bipartite graph is a job's private information. We study several variants of the GAP starting with matching. For the unweighted version, we give an optimal strategyproof mechanism; for maximum weight bipartite matching, however, we show give a 2-approximate strategyproof mechanism and show by a matching lowerbound that this is optimal. Next we study knapsack-like problems, which are APX-hard. For these problems, we develop a general LP-based technique that extends the ideas ...

Dughmi, Shaddin

2010-01-01T23:59:59.000Z

28

User_CatalogItemAssign  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assign Items Self-Assign Items © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Self-Assign Items Purpose The purpose of this job aid is to guide users through the step-by-step process of using the catalog to locate and assign items to their To-Do List. Each task demonstrates a different method of searching the catalog. Task A. Locate and Self-Assign Items Using Simple Catalog Search Navigate to the Catalog search box above Easy Links. Enter keywords to search for in the item's title and description. Click the Search icon ( ). 2 1 3 Locate and Self-Assign Items Using Simple Catalog Search - 4 Steps Task A Locate and Self-Assign Items Using Advance Catalog Search - 7 Steps Task B

29

Program Assignments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Procurement Services » Program Assignments Services » Procurement Services » Program Assignments Program Assignments Office of Headquarters Procurement Services (MA-64) Program Assignments Office of Headquarters Procurement Services (MA-64) Mark C. Brady, Director, 287-1389 Patricia Davies, Acting Deputy Director, 586-8975 CORPORATE SERVICES OFFICE - Barry Ross, Director, MA-64.1, 287-5484 Competition Advocate Contracting Activity Task/Delivery Order Ombudsman Policy Flashes Independent Review Craig Ashline - 287-1412 Acquisition Planning Coordinator Balanced Scorecard Program Officer Federal Manager's Financial Integrity Act Action Officer Foreign Ownership, Control or Influence Point-of-Contact Inspector General/Government Accountability Office Liaison Freedom of Information Act (FOIA) Officer Deborah Black - 287-1416

30

User_Sup_AssignDelegate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an Alternate Supervisor (Supervisor) an Alternate Supervisor (Supervisor) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Assigning an Alternate Supervisor (Supervisor) Purpose The purpose of this job aid is to guide you through the step-by-step process of managing alternate supervisors within SuccessFactors Learning. When employees work for an extended period on a project where they report to a different manager or supervisor, you may want to transfer responsibility for completing the primary supervisor's tasks, for example, a performance review or competency assessment, to an alternate supervisor. The Manage Alternate Supervisors function allows you to identify other users as alternate supervisors and assign primary responsibility to them. After you assign a user as an alternate supervisor, the system

31

Handbook on Overseas Assignments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Handbook on Overseas Assignments Handbook on Overseas Assignments This handbook covers all types of Federal employment overseas, including details, both within DOE as well as to...

32

Test instances for the traffic assignment problem  

E-Print Network (OSTI)

Test instances for the traffic assignment problem. F. Babonneau. ?. J.-P. Vial. ?. January 8, 2008. Abstract. This short note on the Traffic Assignment Problem...

33

CSYM 012 Graphics Programming Assignment  

E-Print Network (OSTI)

CSYM 012 Graphics Programming Assignment: Development of 3D Graphics Software: Java 3D (100%). Due (to model windows and/or strip lights). · User defined geometry (i.e. not primitive shapes). · Loaded · Table of contents · Introduction / Problem statement for the task · Analysis and assumptions

Hill, Gary

34

Priority Assignment in Emergency Response  

Science Conference Proceedings (OSTI)

In the aftermath of mass-casualty events, key resources (such as ambulances and operating rooms) can be overwhelmed by the sudden jump in patient demand. To ration these resources, patients are assigned different priority levels, a process that is called ... Keywords: dynamic programming, emergency response, stochastic orders, stochastic scheduling, triage

Evin Uzun Jacobson; Nilay Tan?k Argon; Serhan Ziya

2012-07-01T23:59:59.000Z

35

Secretary of Energy Advisory Board Public Meeting Committee Members: William Perry, Chair; Ralph Cicerone; John Deutch; Nicholas Donofrio; Michael  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the Summary Minutes of the US Department of Energy (DOE) Secretary of Energy Advisory Board Public Meeting Committee Members: William Perry, Chair; Ralph Cicerone; John Deutch; Nicholas Donofrio; Michael McQuade; Arthur Rosenfeld; Steven Westly; Dan Yergin Date and Time: 8:30 AM- 3:30 PM, January 31, 2012 Location: Department of Energy Forrestal Building, 1000 Independence Avenue, SW, Washington, DC 20585 Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Alyssa Morrissey, Deputy Designated Federal Officer DOE Staff: Secretary Steven Chu; Deputy Secretary Daniel Poneman; Renee Stone, Senior Advisor; Richard Kauffman, Senior Advisor; Ramamoorthy Ramesh, SunShot Director; Minh Le, Solar Energy Technologies Program Chief Engineer; Rachel

36

Planning with imperfect information : interceptor assignment  

E-Print Network (OSTI)

We consider the problem of assigning a scarce number of interceptors to a wave of incoming atmospheric re-entry vehicles (RV). In this single wave, there is time to assign interceptors to a wave of incoming RVs, gain ...

McAllister, Daniel B. (Daniel Brandford)

2006-01-01T23:59:59.000Z

37

User_Sup_AssignDelegate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delegates (Supervisor) Delegates (Supervisor) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Assigning Delegates (Supervisor) Purpose The purpose of this job aid is to guide you through the step-by-step process of using the delegate feature within SuccessFactors Learning. A delegate is another user who you identify to act on the work that you need to complete in the user interface. When you identify a user as a delegate through the Delegates area in your Options and Settings screen, the system adds that user's name to the Delegators list. Typically, you identify a user as a delegate when you want the user to perform some of your tasks. You can use the Delegates area to add or edit the permissions for a delegate, which you might want to do, for example, if you plan to take an

38

Unclassified Foreign National Visits & Assignments Questionnaire |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Calibration Facilities » Unclassified Foreign National Services » Calibration Facilities » Unclassified Foreign National Visits & Assignments Questionnaire Unclassified Foreign National Visits & Assignments Questionnaire Visitors who are foreign nationals must complete and submit the Unclassified Foreign National Visits & Assignments Questionnaire 30 days before accessing facilities. Unclassified Foreign National Visits.doc Description Unclassified Foreign National Visits & Assignments Questionnaire More Documents & Publications NEUP Foreign Travel Request Form FAQS Qualification Card - Safeguards and Security General Technical Base FAQS Qualification Card - Safeguards and Security Calibration Facilities Ecosystem Management Team Environmental Justice Environmental Management System Long-Term Surveillance - Operations and Maintenance

39

JOBAID-LAUNCHING AND COMPLETING ASSIGNED SURVEY  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surverys.

40

Project Registration Number Assignments (Completed) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications Project Registration Number Assignments (Active) Technical Standards, DOE Orders and Applicable CFRsDEAR Crosswalk - February 2, 2002 All Active DOE Technical...

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Registration Number Assignments (Active) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration Number Assignments (Completed) All Active DOE Technical Standards Document Technical Standards, DOE Orders and Applicable CFRsDEAR Crosswalk - February 2, 2002...

42

Object Assignment Strategy for Distributed Multimedia Systems  

Science Conference Proceedings (OSTI)

As application of multimedia and network have become popular in recent years, many technique have been proposed to create fascinating works, but little of them has focused on assigning tasks effectively in a distributed manner. In this paper we propose ... Keywords: dynamic assignment strategy, Petri-net modeling, load measurement

Wen-Tsung Chang; Chien-Chiung Hsieh

1998-10-01T23:59:59.000Z

43

Computing role assignments of chordal graphs  

Science Conference Proceedings (OSTI)

In social network theory, a simple graph G is called k-role assignable if there is a surjective mapping that assigns a number from {1,...,k} called a role to each vertex of G such that any two vertices with the same role have ...

Pim Van't Hof; Danil Paulusma; Johan M. M. Van Rooij

2009-09-01T23:59:59.000Z

44

Solving the Rectangular assignment problem and applications  

E-Print Network (OSTI)

is assigned to job j and 0 otherwise, and the corresponding costs cij the RLAP ...... Let the (production) cost of processing task i be cij on machine j and dij on a...

45

JOBAID-SELF ASSIGNING COURSES (ITEMS)  

Energy.gov (U.S. Department of Energy (DOE))

In this jobaid you will learn to use the Course Catalog, Browse Catalog, Recommended Items, Locate and Self-Assign Items (Courses) Using the Search Catalog features, Narrow Course Searches using...

46

Help:Assigning permissions | Open Energy Information  

Open Energy Info (EERE)

Assigning permissions Assigning permissions Jump to: navigation, search "Assigning permissions" means granting users extra rights within the wiki software (or revoking these rights). This is done by going to the Special:UserRights page, and adding users into a "group" which has specific rights. The first thing to note however, is that this action requires special permissions itself! Tools.png Tip for wiki admins: See Manual:User rights and Manual:User rights management for information on fine grained permissions tweaks, and how to define new groups, or adjust existing groups to give different rights. Note that this help page describes the default MediaWiki configuration, but every aspect of permissions is highly customisable with server config settings. You may wish to rewrite this help page to reflect your wiki configuration

47

Unclassified Foreign National Visits & Assignments Questionnaire  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unclassified Foreign National Visits & Assignments Questionnaire Unclassified Foreign National Visits & Assignments Questionnaire |Welcome to U.S. Department of Energy Office of Legacy Management! We are looking forward to your visit or assignment with us. In order to comply with our security requirements and ensure that your time with the Department of Energy goes smoothly we need to obtain some information from you prior to your arrival. Please take a few minutes to provide the information requested below for each member of your party that is not a U.S. citizen and then return the form(s) to your host. Please be sure to comply with the deadlines your host has communicated to you for returning this form.| |Part 1: Completed by Visitor Please complete all questions below, as applicable. | |1.|Given (first) name (exactly as it appears on passport)| |

48

Fair rate assignment in interference limited multi-hop networks  

E-Print Network (OSTI)

1.2 Utility Based Fair Rate Assignment . . . . . . 1.2.1de?ned in [21]. Utility Based Fair Rate Assignment In thisfunction. The utility based fair rate assignment policy (

Arisoylu, Mustafa

2006-01-01T23:59:59.000Z

49

Secretary of Energy Advisory Board Public Meeting Committee Members: William Perry, Chair; Nicholas Donofrio, Co-Chair; Michael McQuade;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy (DOE) U.S. Department of Energy (DOE) Secretary of Energy Advisory Board Public Meeting Committee Members: William Perry, Chair; Nicholas Donofrio, Co-Chair; Michael McQuade; Arthur Rosenfeld; Steven Westly Date and Time: 9:00 AM- 3:30 PM, April 17, 2012 Location: Argonne National Laboratory 9700 S. Cass Avenue Lemont, IL 60439 Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Alyssa Morrissey, Deputy Designated Federal Officer DOE Staff: Secretary Steven Chu; Renee Stone, Senior Advisor Argonne Staff: Eric Isaacs, Director of Argonne National Laboratory; Peter Littlewood, Associate Laboratory Director; Don Hillebrand, Energy Systems Interim Director; Ian Foster, Computation Institute Director; Mark Peters,

50

Assigning multiple activities to work shifts  

Science Conference Proceedings (OSTI)

In some companies such as large retail stores, the employees perform different activities (e.g., cashier or clerk in a specific department) to respond to a customer demand for each activity that varies over the planning horizon and must be fulfilled ... Keywords: Activity assignment, Column generation, Multi-commodity network flow model, Rolling horizon, Work shifts

Quentin Lequy; Mathieu Bouchard; Guy Desaulniers; Franois Soumis; Beyime Tachefine

2012-04-01T23:59:59.000Z

51

CSY 3019 Graphics Programming Assignment 2  

E-Print Network (OSTI)

CSY 3019 Graphics Programming Assignment 2: Development of 2D/3D Graphics Software: Java 3D (50.e. not primitive shapes). · Loaded geometry using object files e.g. additional items rendered within the rooms · Table of contents · Introduction / Problem statement for the task · Analysis and assumptions

Hill, Gary

52

Reducing code size through address register assignment  

Science Conference Proceedings (OSTI)

In DSP processors, minimizing the amount of address calculations is critical for reducing code size and improving performance, since studies of programs have shown that instructions that manipulate address registers constitute a significant portion of ... Keywords: DSP, Software compilation, address registers, register assignment

G. Chen; M. Kandemir; M. J. Irwin; J. Ramanujam

2006-02-01T23:59:59.000Z

53

Algorithms for the generalized weighted frequency assignment problem  

Science Conference Proceedings (OSTI)

We report the performance of 15 construction heuristics to find initial solutions, and 4 search algorithms to solve a frequency assignment problem where the value of an assigned frequency is determined by the site where it is assigned. The algorithms ... Keywords: Cross entropy, Frequency assignment, Genetic algorithm, Heuristics, Simulated annealing, Tabu search

David F. MuOz; Diego F. MuOz

2012-12-01T23:59:59.000Z

54

Microsoft Word - CLP_Credit_Assignment_Table  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learning Points Credit Assignments Learning Points Credit Assignments CLP Opportunity Description* Unit = DOE CLP Units TRAINING/EDUCATION Attendance at academic courses at an accredited college or university 1 credit hour = 10 Audited academic courses at an accredited college or university 1 semester credit = 5 Instructing at an accredited college or university 1 semester credit = 10 Online training geared toward continuous learning and planned as part of individual's professional development. Online training must be supported by a record of completion 1 training hour = 1 Audit a course in your certification program and provide feedback. This must be approved by the Professional Development Division 1 course = 5 PROFESSIONAL ACTIVITIES Attendance at educational portions of technical

55

Simulation of the Post-Retrofit Thermal Energy Use for the Perry-Castaneda Library Building with the Use of Simplified System Models  

E-Print Network (OSTI)

Several state owned buildings with dual-duct constant volume (DDCV) systems are being retrofitted with energy efficient variable air volume (VAV) systems as part of Texas LoanSTAR Program. One method of determining the energy savings resulting from energy conserving retrofits relies on the use of a model for the daily whole building consumption, Epre, in the pre-retrofit configuration. Epre is typically a function of primary influencing parameters such as ambient temperature, humidity, building internal gains and others (Figure 1). Following the retrofit, the energy saved, E,av is determined using measured daily consumption, Emea3 as shown in Figure 1. This method is being used in the Texas LoanSTAR monitoring and analysis program for buildings that have adequate pre-retrofit monitored data. Unfortunately, in the Perry-Castaneda Library (PCL) building, the retrofits were completed before the monitoring instrumentation was installed. Therefore, no pre-retrofit monitored data are available for this building. Hence another method to estimate savings is needed. Such a method was developed and tested (Katipamula and Claridge 1991). This method was based on the use of the ASHRAE TC 4.7 simplified energy analysis procedure (SEAP). It involved developing one model each for the VAV (post-retrofit system) and the DDCV (pre-retrofit system) systems.

Katipamula, S.; Claridge, D. E.

1991-01-01T23:59:59.000Z

56

Linear Assignment Maps for Correlated System-Environment States  

E-Print Network (OSTI)

An assignment map is a mathematical operator that describes initial system-environment states for open quantum systems. We reexamine the notion of assignments, introduced by Pechukas, and show the conditions assignments can account for correlations between the system and the environment, concluding that assignment maps can be made linear at the expense of positivity or consistency is more reasonable. We study the role of other conditions, such as consistency and positivity of the map, and show the effects of relaxing these. Finally, we establish a connection between the violation of positivity of linear assignments and the no-broadcasting theorem.

Csar A. Rodrguez-Rosario; Kavan Modi; Aln Aspuru-Guzik

2009-10-29T23:59:59.000Z

57

A Bayesian approach to simultaneously quantify assignments and linguistic uncertainty  

SciTech Connect

Subject matter expert assessments can include both assignment and linguistic uncertainty. This paper examines assessments containing linguistic uncertainty associated with a qualitative description of a specific state of interest and the assignment uncertainty associated with assigning a qualitative value to that state. A Bayesian approach is examined to simultaneously quantify both assignment and linguistic uncertainty in the posterior probability. The approach is applied to a simplified damage assessment model involving both assignment and linguistic uncertainty. The utility of the approach and the conditions under which the approach is feasible are examined and identified.

Chavez, Gregory M [Los Alamos National Laboratory; Booker, Jane M [BOOKER SCIENTIFIC FREDERICKSBURG; Ross, Timothy J [UNM

2010-10-07T23:59:59.000Z

58

Provably Good Solutions for Wavelength Assignment in Optical ...  

E-Print Network (OSTI)

the transmission and switching capacities of the installed equipment. ..... wavelengths on all its links and that no wavelength is assigned more than its availability.

59

Parallel machine scheduling with nested job assignment restrictions  

Science Conference Proceedings (OSTI)

We derive a polynomial time approximation scheme for a special case of makespan minimization on unrelated machines. Keywords: Approximation algorithms, Restricted assignment, Scheduling

Gabriella Muratore; Ulrich M. Schwarz; Gerhard J. Woeginger

2010-01-01T23:59:59.000Z

60

Robust Dynamic Traffic Assignment under Demand and Capacity Uncertainty  

E-Print Network (OSTI)

Assignment under Demand and Capacity Uncertainty ? Giuseppeworst-case sce- nario of demand and capacity con?gurations.uncertain demands and capacities are modeled as unknown-but-

Calafiore, Giuseppe; El Ghaoui, Laurent

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Assignment of PCR markers to river buffalo chromosomes  

E-Print Network (OSTI)

Note Assignment of PCR markers to river buffalo chromosomes Hanaa A. Oraby Soheir M. El Nahas H physical map using somatic cell hybrids and the cattle gene map as a template, ten PCR primers designed / chromosome / synteny / PCR markers / gene mapping * Correspondence and reprints Résumé - Assignation de

Recanati, Catherine

62

William Perry | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

includes serving as a laboratory director for General Telephone and Electronics (1954-1964); founder and president of ESL Inc. (1964-1977); executive vice-president of...

63

Perry Safety Book for Web  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Before using this product, read, understand and follow the Assembly and Safe Use Instruc- tions. Save this document for future reference. It contains important safety...

64

Runtime Assignment of Reconfigurable Hardware Components for Image Processing Pipelines  

E-Print Network (OSTI)

The combination of hardware acceleration and flexibility make FPGAs important to image processing applications. There is also a need for efficient, flexible hardware/software codesign environments that can balance the benefits and costs of using FPGAs. Image processing applications often consist of a pipeline of components where each component applies a different processing algorithm. Components can be implemented for FPGAs or software. Such systems enable an image analyst to work with either FPGA or software implementations of image processing algorithms for a given problem. The pipeline assignment problem chooses from alternative implementations of pipeline components to yield the fastest pipeline. Our codesign system solves the pipeline assignment problem to provide the most effective implementation automatically, so the image analyst can focus solely on choosing components which make up the pipeline. However, the pipeline assignment problem is NP complete. An efficient, dynamic solution to the pipeline assignment problem is a desirable enabler of codesign systems which use both FPGA and software implementations. This paper is concerned with solving pipeline assignment in this context. Consequently, we focus on optimal and heuristic methods for fast (fixed time limit) runtime pipeline assignment. Exhaustive search, integer linear programming and local search methods for pipeline assignment are investigated. We present experimental findings for pipelines of 20 or fewer components which show that in our environment, optimal runtime solutions are possible for smaller pipelines and nearly optimal heuristic solutions are possible for larger pipelines.

Heather Quinn; L. A. Smith King; Miriam Leeser; W. Meleis; Waleed Meleis

2003-01-01T23:59:59.000Z

65

Electricity Suppliers' Service Area Assignments (Indiana) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Suppliers' Service Area Assignments (Indiana) Electricity Suppliers&#039; Service Area Assignments (Indiana) Electricity Suppliers' Service Area Assignments (Indiana) < Back Eligibility Agricultural Commercial Construction Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Siting and Permitting Provider Utility Regulatory Commission To promote efficiency and avoid waste and duplication, rural and

66

Management Alert - Extended Assignments at Princeton Plasma Physics Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extended Assignments at Princeton Extended Assignments at Princeton Plasma Physics Laboratory DOE/IG-0864 May 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 May 17, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Management Alert on "Extended Assignments at Princeton Plasma Physics Laboratory" BACKGROUND Princeton University operates the Princeton Plasma Physics Laboratory (Princeton) under a contract with the Department of Energy's Office of Science. Princeton works with partners around the world to develop fusion as an energy source. The Laboratory's annual operating costs

67

Linear assignment maps for correlated system-environment states  

Science Conference Proceedings (OSTI)

Assignment maps are mathematical operators that describe initial system-environment states for open quantum systems. We re-examine the notion of assignments that account for correlations between the system and the environment and show that these maps can be made linear at the expense of giving up positivity or consistency of the map. We study the role of positivity and consistency of the map and show the effects of relaxing these. Finally, we establish a connection between the violation of the positivity of linear assignments and the no-broadcasting theorem.

Rodriguez-Rosario, Cesar A.; Aspuru-Guzik, Alan [Department of Chemistry and Chemical Biology, Harvard University, Cambridge, Massachusetts (United States); Modi, Kavan [Centre for Quantum Technologies, National University of Singapore (Singapore)

2010-01-15T23:59:59.000Z

68

CNR PURCHASING ASSIGNMENTS as of September 27, 2013  

E-Print Network (OSTI)

CNR PURCHASING ASSIGNMENTS as of September 27, 2013 Jessie Jessie Jessie Robin Robin Darshan.talley@ leaf@ leaf@ leaf@ roberson@ 664-4058 664-9469 664-9469 664-9469 664-9466 Beissinger Allen

Wildermuth, Mary C

69

A fair assignment algorithm for multiple preference queries  

Science Conference Proceedings (OSTI)

Consider an internship assignment system, where at the end of each academic year, interested university students search and apply for available positions, based on their preferences (e.g., nature of the job, salary, office location, etc). In a variety ...

Leong Hou U; Nikos Mamoulis; Kyriakos Mouratidis

2009-08-01T23:59:59.000Z

70

Peace Corps Assignment 114 Farm Management/Agribusiness  

E-Print Network (OSTI)

. Train agribusinesses in market analysis, production techniques, economic forecasting, financing options at agricultural training institutions. Technical Assistance and Training for Small Farmers Design and implementPeace Corps Assignment 114 Farm Management/Agribusiness Creating Sustainable Solutions As a Peace

Maxwell, Bruce D.

71

LARGE NUMBERS OF UNDETECTED CRACKS IN THE WORLDS PWRS  

E-Print Network (OSTI)

Documents of the Davis-Besse incident reveal a strong possibility that there are large numbers of undetected cracks in the worlds pressurized water reactors, particularly in the US. This suspicion has been confirmed by the discovery of an additional crack at Davis-Besse itself. (568.5402) NIRS/WISE Amsterdam The cracks are nothing new: they were first discovered in Bugey-3,

unknown authors

2002-01-01T23:59:59.000Z

72

Optimal Routing and Assignment of Consultants for Energy Education, Inc.  

Science Conference Proceedings (OSTI)

Energy Education, Inc. EEI, a US management consulting firm, specializes in implementing energy conservation programs for schools, universities, and large churches. Similar to many consulting firms, travel expenses are among its largest budget items. ... Keywords: cluster analysis, consulting, employee assignment, vehicle routing

Junfang Yu; Randy Hoff

2013-03-01T23:59:59.000Z

73

Channel assignment in cellular networks with synchronous base stations  

Science Conference Proceedings (OSTI)

A radio spectrum is a shared, limited, and expensive resource in cellular networks. A network allocates a channel from this spectrum to provide connectivity to a user. With the ever increasing number of users, it is a challenge and a business opportunity ... Keywords: cellular networks, dynamic channel assignment

Kshirasagar Naik; David S.L. Wei; Stephan Olariu

2005-10-01T23:59:59.000Z

74

Domain assignments for FSSP representative set using DomainParser  

NLE Websites -- All DOE Office Websites (Extended Search)

Domain assignments for the FSSP representative set Domain assignments for the FSSP representative set The following are the domain assignments for the FSSP representative set (released on January 31, 2000, 1987 chains in total) using DomainParser. Each line shows a PDB entry (with a chain identifier if any), total number of residues, number of domains, and domain assignments. The result is obtained fully automatically without manual editing. 12asa 327 2 (33-86; 271-288) (4-32; 87-270; 289-330) 153l 185 1 16pk 415 2 (5-205; 409-419) (206-408) 16vpa 311 2 (47-130; 164-233; 324-349) (131-163; 234-323; 395-402) 1914 171 1 19hca 292 2 (45-107) (1-44; 108-292) 1a02f 53 1 1a02j 52 1 1a02n 280 2 (399-569) (570-678) 1a04a 205 2 (5-126) (127-216) 1a0aa 63 1 1a0ca 437 1 1a0fa 201 2 (1-81) (82-201) 1a0ha 159 1 1a0i 332 2 (2-239) (240-349)

75

Inspection of Forrestal parking permit allocation and assignments  

Science Conference Proceedings (OSTI)

The purpose of this inspection was to review the process cr allocating and assigning parking permits at the Forrestal building. Specifically, we sought to determine the roles and responsibilities of Department of Energy (DOE) officials involved in the administration of the Forrestal parking permit process during the period June 1, 1991 to February 1, 1992. We also sought to determine if the allocation and assignment of Forrestal building parking spaces was implemented in accordance with Federal and DOE requirements. For our review, we interviewed the Headquarters officials involved in the administration of the parking permit allocation and assignment process. We also reviewed parking permit files and associated documentation for the period June 1, 1991 through February 1, 1992. In addition, we conducted a limited sampling of parking permits that were revoked during July and August 1991 to assess if they were processed in compliance with applicable regulations. We found no evidence that the actions by the Special Assistant to the Secretary (White House Liaison) and the other members of the parking committee regarding the issuance and revocation of parking permits were for any reason other than a desire to ensure that only individuals having a legitimate basis for a parking permit were issued a permit. However, we found that decisions by the parking committee regarding revocation of permits and appeals of revocation decisions were not always documented, nor were there written guidelines or procedures to govern the activities of the committee. In our view, the lack of written guidelines and procedures resulted in the use of invalidated personal knowledge by the parking committee in making decisions involving the revocation of parking permits and led to inconsistencies in the notification of individuals about the associated appeal process.

Not Available

1992-12-16T23:59:59.000Z

76

A Direct Link between Feature Tracking and Height Assignment of Operational EUMETSAT Atmospheric Motion Vectors  

Science Conference Proceedings (OSTI)

Height Assignment (HA) is currently the most challenging task in the operational Atmospheric Motion Vectors (AMVs) extraction scheme. Several sources of error are associated with the height assignment step, including the sensitivity of the HA ...

Rgis Borde; Marie Doutriaux-Boucher; Greg Dew; Manuel Carranza

77

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Chicago, Milwaukee, and St. Paul Rail Yard Company Site in Perry, Iowa. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

2013-03-01T23:59:59.000Z

78

CNR PURCHASING ASSIGNMENTS Jessie Jessie Jessie Robin Robin Robin Nikki Nikki  

E-Print Network (OSTI)

CNR PURCHASING ASSIGNMENTS Jessie Jessie Jessie Robin Robin Robin Nikki Nikki Sanchez Sanchez Leaf Leaf Leaf Lywanda Groen Grenoble Grenoble Grenoble Dyer groenn@ leaf@ leaf@ leaf@ roberson@ 2

Silver, Whendee

79

Perry, Wisconsin: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Wisconsin: Energy Resources Wisconsin: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.8830921°, -89.7942892° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8830921,"lon":-89.7942892,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

80

Perry, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ohio: Energy Resources Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.7603259°, -81.1409322° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.7603259,"lon":-81.1409322,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft PowerPoint - Perry.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MIDPOINT AREA LOS ANGELES AREA ALBUQUERQUE AREA NAVAJO DENVER AREA MOJAVE HOOVER PHOENIX AREA LANGDON HOT SPRINGS HELLS CANYON CHIEF JOSEPH BURNS PINTO FOUR CORNERS SHASTA LANGDON...

82

Council Brief Photo: Ralph Perry, 1982.  

E-Print Network (OSTI)

. Coal Gasification Combined Cycle Plant Costs and Other Parameters simulated operations solely on the basis of minimizing cost. Elfin now estimates prevailing pool prices, including an energy payment to generators, and iteratively estimated payments to committed generators

83

A Constraint-Based Approach to Assigning System Components to Tasks  

Science Conference Proceedings (OSTI)

In multi-component systems, individual components must be assigned to the tasks that they are to perform. In many applications, there are several possible task decompositions that could be used to achieve the task, and there are limited resources ... Keywords: autonomous underwater vehicles, constrained heuristic search, constraint satisfaction, task assignment

Elise H. Turner; Roy M. Turner

1999-03-01T23:59:59.000Z

84

Maximal network reliability with optimal transmission line assignment for stochastic electric power networks via genetic algorithms  

Science Conference Proceedings (OSTI)

This study proposes a genetic algorithm based method integrating the minimal paths and the recursive sum of disjoint products to find maximal network reliability with optimal transmission line assignment for a stochastic electric power network. In our ... Keywords: Genetic algorithm, Maximal network reliability, Recursive sum of disjoint products, Stochastic electric power network, Transmission line assignment

Yi-Kuei Lin; Cheng-Ta Yeh

2011-03-01T23:59:59.000Z

85

Collaborative assignment using belief-desire-intention agent modeling and negotiation with speedup strategies  

Science Conference Proceedings (OSTI)

In this paper, we propose a distributed agent model that applies belief-desire-intention (BDI) reasoning and negotiation for addressing the linear assignment problem (LAP) collaboratively. In resource allocation, LAP is viewed as seeking a concurrent ... Keywords: Belief-desire-intention (BDI) negotiation model, Collaborative linear assignment, Distributed problem solving, Reasoning control

Kiam Tian Seow; Kwang Mong Sim

2008-02-01T23:59:59.000Z

86

Generating Hard Test Instances with Known Optimal Solution for the Rectilinear Quadratic Assignment Problem  

Science Conference Proceedings (OSTI)

In this paper we consider the rectilinear version of the quadratic assignment problem (QAP). We define a class of edge-weighted graphs with nonnegatively valued bisections. For one important type of such graphs we provide a characterization of point ... Keywords: Combinatorial optimization, Graphs, Quadratic assignment, Test instances

G. Palubeckis

1999-09-01T23:59:59.000Z

87

CMSC 475/675 Introduction to Neural Networks Fall 2011 Project 2 Assignment  

E-Print Network (OSTI)

CMSC 475/675 Introduction to Neural Networks Fall 2011 Project 2 Assignment This project assignment') is their Manhattan distance. For example, the distance between (1, 2) and (2, 2) is 1, between (1, 2) and (2, 1) is 2 vectors on the 3 by 3 output grid. You can use any language for this project. Report Besides

Peng, Yun

88

Audit Report - Follow-up Audit on Term Assignments of Contractor Employees, DOE-IG-0890  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Term on Term Assignments of Contractor Employees DOE/IG-0890 July 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 July 2, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Follow-up Audit on Term Assignments of Contractor Employees" BACKGROUND The Department of Energy frequently assigns facility contractor personnel to the Washington, DC, area on a temporary basis when program officials consider it necessary to obtain technical expertise not available locally. Commonly referred to as term assignments, the estimated cost of all such assignments for Fiscal Year (FY) 2012 was over $37 million, all of which was

89

Electric Utility Company Assigned to a Zip Code? | OpenEI Community  

Open Energy Info (EERE)

Electric Utility Company Assigned to a Zip Code? Electric Utility Company Assigned to a Zip Code? Home I have found an error in the utility company assigned to a zip code. I am not sure if the "assigned" utility company covers part of the zip code in question or not. How do I report an error like this for correction? Thanks. Submitted by Conroyt on 23 May, 2013 - 09:01 1 answer Points: 0 Thanks for submitting this. The Utilities Gateway (http://en.openei.org/wiki/Gateway:Utilities) uses the developer.nrel.gov service for zip-code lookups (http://developer.nrel.gov/doc/api/utility_rates/v3). This in turn uses Google for geocoding, and finds the centroid of the geographic region in question. This means that the result is based on the center of a zip code region, which may have no data. This question is timed well as we are

90

JM to Develop DOE O 321.2, Details and Intergovernmental Personnel Act Assignments  

Directives, Delegations, and Requirements

This Order will replace DOE M 321.1-1, dated 8/24/2000, and provides the continuing support and guidelines that addresses IPA assignments, and replaces Chapter ...

2011-09-15T23:59:59.000Z

91

Information theoretic approach for performance evaluation of multi-class assignment systems  

E-Print Network (OSTI)

Multi-class assignment is often used to aid in the exploitation of data in the Intelligence, Surveillance, and Reconnaissance (ISR) community. For example, tracking systems collect detections into tracks and recognition ...

Holt, Ryan S.

92

Grade Assignments for Models Used for Calibration of Gross-Count Gamma-Ray Logging Systems (December 1983)  

Energy.gov (U.S. Department of Energy (DOE))

Grade Assignments for Models Used for Calibration of Gross-Count Gamma-Ray Logging Systems (December 1983)

93

Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unclassified Foreign National Visits Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory INS-O-13-05 September 2013 Department of Energy Washington, DC 20585 September 16, 2013 MEMORANDUM FOR THE MANAGER, OAK RIDGE NATIONAL LABORATORY SITE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory" BACKGROUND In support of its research and development mission, the Department of Energy's national laboratories host thousands of foreign national visitors and assignees (foreign nationals) every year for research collaborations and access to scientific user facilities. During calendar year

94

The Department of Energy's International Offices and Foreign Assignments, OAS-L-13-05  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy's Department of Energy's International Offices and Foreign Assignments OAS-L-13-05 January 2013 Department of Energy Washington, DC 20585 January 16, 2013 MEMORANDUM FOR THE ASSOCIATE PRINCIPAL DEPUTY ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION PRINCIPAL DEPUTY ASSISTANT SECRETARY FOR POLICY AND INTERNATIONAL AFFAIRS DEPUTY DIRECTOR FOR FIELD OPERATIONS, OFFICE OF SCIENCE FROM: David Sedillo Director, Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's International Offices and Foreign Assignments" BACKGROUND The mission of the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) is to ensure America's security and prosperity by addressing its energy,

95

EXECUTIVE SUMMARY In March of2002, the FirstEnergy Nuclear Operating Company (FENOC) discovered a  

E-Print Network (OSTI)

significant degradation ofthe Davis-Besse Nuclear Power Station (the Station) reactor pressure vessel head and entered an extended shutdown. The Station was placed under the U.S. Nuclear Regulatory Commission's Inspection Manual Chapter 0350 process for restart. As part ofthe FENOC Restart Plan, the Station committed to perform an independent evaluation ofthe safety culture at Davis-Besse. This report describes the results ofan evaluation ofthe safety culture at the Davis-Besse Station conducted dUring February 2003. The primary objective ofthe evaluation was to provide information regarding the presence or absence ofsafety culture characteristics at Davis-Besse. Observations regarding the Station's safety culture characteristics and areas in need of improvement with respect to those characteristics are presented. Safety culture characteristics that are important for the existence ofa positive safety culture within a nuclear facility have been identified to include: Safety is a clearly recognized value in the organization. Accountability for safety in tbe organization is clear. Safety is integrated into aU activities in the organization.

unknown authors

2003-01-01T23:59:59.000Z

96

MODELING SECURITY IN CYBER-PHYSICAL SYSTEMS  

E-Print Network (OSTI)

network at the Davis-Besse nuclear power plant in Oak Harbor, Ohio, was infected [39]. There have been-physical systems, threat models, protocols for treaty verification. 1. Introduction The rapid growth of information) sys- tems that monitor power, gas/oil transportation, water and waste-water distribution. Such systems

Burmester, Mike

97

A new algorithm for improved VDD assignment in low power dual VDD systems  

Science Conference Proceedings (OSTI)

We present the first in-depth study of the two existing algorithms, namely, Clustered Voltage Scaling (CVS) and Extended Clustered Voltage Scaling (ECVS), used for assigning the voltage supply to gates in integrated circuits having dual power supplies. ... Keywords: CVS, ECVS, dual VDD design, level converters, low power design algorithms

Sarvesh H. Kulkarni; Ashish N. Srivastava; Dennis Sylvester

2004-08-01T23:59:59.000Z

98

Co-optimization of TSV assignment and micro-channel placement for 3D-ICs  

Science Conference Proceedings (OSTI)

The three dimensional circuit (3D-IC) brings forth new challenges to physical design such as allocation and management of through-silicon-vias (TSVs). Meanwhile, the thermal issues in 3D-IC becomes significant necessitating the use of active cooling ... Keywords: 3d-ic, liquid cooling, micro-channel, tsv assignment

Bing Shi; Caleb Serafy; Ankur Srivastava

2013-05-01T23:59:59.000Z

99

A multiobjective faculty-course-time slot assignment problem with preferences  

Science Conference Proceedings (OSTI)

A faculty-course-time slot assignment problem is studied. The multiobjective 0-1 linear programming model considering both the administration's and instructors' preferences is developed and a demonstrative example is included. Both modeling and solving ... Keywords: AHP, Conic scalarization, Faculty course time slot problem, Multi-objective optimization

Nergiz A. Ismayilova; Mujgan Sa?Ir; Rafail N. Gasimov

2007-10-01T23:59:59.000Z

100

A comparison between python and Tcl solution on four programs assigned in CS0  

Science Conference Proceedings (OSTI)

This paper takes four programs that were assigned to students in a bread-first computer science course and compares the solutions when written in Tcl/Tk and Python. It then concludes with a discussion of which programming language is better in a CSO ...

Peter C. Isaacson; Terry A. Scott

2002-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CAeSaR: unified cluster-assignment scheduling and communication reuse for clustered VLIW processors  

Science Conference Proceedings (OSTI)

Clustered architectures have been proposed as a solution to the scalability problem of wide ILP processors. VLIW architectures, being wide-issue by design, benefit significantly from clustering. Such architectures, being both statically scheduled and ... Keywords: cluster assignment, clustered VLIW, instruction scheduling

Vasileios Porpodas; Marcelo Cintra

2013-09-01T23:59:59.000Z

102

Role assignment in institutional clouds for rule-based enterprise management  

Science Conference Proceedings (OSTI)

In the context of engineering cloud computing applications for enterprise management, we want to represent a theory of institutions and role assignment in terms of a formal specification of rule-based action and agency. We consider how a tripartite distinction ... Keywords: cloud computing, institutions, multi-agent systems, self-organisation

Jeremy Pitt; Julia Schaumeier; Alexander Artikis

2011-11-01T23:59:59.000Z

103

Nodes organization for channel assignment with topology preservation in multi-radio wireless mesh networks  

Science Conference Proceedings (OSTI)

The wireless mesh network is a new emerging broadband technology providing the last-mile Internet access for mobile users by exploiting the advantage of multiple radios and multiple channels. The throughput improvement of the network relies heavily on ... Keywords: Channel assignment, Multiple channels, Multiple radios, Particle swarm optimization algorithm, Wireless mesh networks

Hongju Cheng; Naixue Xiong; Athanasios V. Vasilakos; Laurence Tianruo Yang; Guolong Chen; Xiaofang Zhuang

2012-07-01T23:59:59.000Z

104

Roboshop: multi-layered sketching interface for robot housework assignment and management  

Science Conference Proceedings (OSTI)

As various home robots come into homes, the need for efficient robot task management tools is arising. Current tools are designed for controlling individual robots independently, so they are not ideally suitable for assigning coordinated action among ... Keywords: graphical user interface, home robots, housework management, human-robot interaction, sketching interface

Kexi Liu; Daisuke Sakamoto; Masahiko Inami; Takeo Igarashi

2011-05-01T23:59:59.000Z

105

CSY3019 -Graphics Programming Assignment 2: Development of 3D graphics software: Java 2D (50%)  

E-Print Network (OSTI)

CSY3019 - Graphics Programming Assignment 2: Development of 3D graphics software: Java 2D (50 and/or strip lights). · User defined or loaded geometry (i.e. not primitive shapes). · The room & Title Page · Table of contents · Introduction · Analysis · Design · Implementation · Testing

Hill, Gary

106

A survey on physical layer impairments aware routing and wavelength assignment algorithms in optical networks  

Science Conference Proceedings (OSTI)

Optical networks are moving from opaque and translucent architectures towards all-optical (transparent) architectures. In translucent architectures a small amount of regeneration (e.g. optical-electronic-optical conversion) is available in the network. ... Keywords: Impairment aware RWA, Impairment constrained RWA, Impairment constraint-based routing, Optical network planning, Physical-layer impairments, Routing and wavelength assignment (RWA)

Siamak Azodolmolky; Miros?aw Klinkowski; Eva Marin; Davide Careglio; Josep Sol Pareta; Ioannis Tomkos

2009-05-01T23:59:59.000Z

107

An ant colony optimization approach for solving the nuclear magnetic resonance structure based assignment problem  

Science Conference Proceedings (OSTI)

Nuclear Magnetic Resonance (NMR) Spectroscopy is an important technique that allows determining protein structure in solution. An important problem in protein structure determination using NMR spectroscopy is the mapping of peaks to corresponding amino ... Keywords: ant colony optimization, backbone resonance assignments, n15-labeled, nmr

Jeyhun Aslanov; Blent atay; Mehmet Serkan Apaydin

2013-07-01T23:59:59.000Z

108

An Improved Nuclear Vector Replacement Algorithm for Nuclear Magnetic Resonance Assignment  

E-Print Network (OSTI)

An Improved Nuclear Vector Replacement Algorithm for Nuclear Magnetic Resonance Assignment to the Nuclear Vector Replacement (NVR) algorithm [24] for high-throughput Nuclear Magnetic Resonance (NMR% accu- racy) on the same test suite examined in [24], and runs in O(n5/2 log (cn)) time where n

109

Graduated assignment algorithm for finding the common labelling of a set of graphs  

Science Conference Proceedings (OSTI)

In pattern recognition applications, it is useful to represent objects by attributed graphs considering their structural properties. Besides, some graph matching problems need a Common Labelling between vertices of a set of graphs. Computing this Common ... Keywords: graduated assignment, graph common labelling, inconsistent labelling, multiple graph matching, softassign

Albert Sol-Ribalta; Francesc Serratosa

2010-08-01T23:59:59.000Z

110

Single-machine batch delivery scheduling with an assignable common due date and controllable processing times  

Science Conference Proceedings (OSTI)

We consider single-machine batch delivery scheduling with an assignable common due date and controllable processing times, which vary as a convex function of the amounts of a continuously divisible common resource allocated to individual jobs. Finished ... Keywords: Batch delivery, Common due date, Resource allocation, Scheduling

Yunqiang Yin, T. C. E. Cheng, Shuenn-Ren Cheng, Chin-Chia Wu

2013-08-01T23:59:59.000Z

111

A Simple Heuristic for Assignment of Cells to Switches in a PCS Network  

Science Conference Proceedings (OSTI)

This work deals with a design problem for a network of Personal Communication Services (PCS). The goal is to assign cells to switches in a PCS Network (PCSN) in an optimum manner so as to minimize the total cost which includes two types of cost, ... Keywords: PCS, cell, clustering, handoff, heuristic, optimization, switch

Debashis Saha; Amitava Mukherjee; Partha Sarathi Bhattacharya

2000-03-01T23:59:59.000Z

112

Single assignment C (SAC) high productivity meets high performance: high productivity meets high performance  

Science Conference Proceedings (OSTI)

We present the ins and outs of the purely functional, data parallel programming language SaC (Single Assignment C). SaC defines state- and side-effect-free semantics on top of a syntax resembling that of imperative languages like C/C++/C# or ...

Clemens Grelck

2011-06-01T23:59:59.000Z

113

A joint centralized scheduling and channel assignment scheme in WiMax mesh networks  

Science Conference Proceedings (OSTI)

The IEEE 802.16 standard, also known as Worldwide Interoperability for Microwave Access (WiMax), which provides a mechanism for deploying high-speed wireless mesh networks in metropolitan areas. Thus, Quality of Service (QoS) is very important for WiMax ... Keywords: MDFS algorithm, WiMax mesh networks, centralized scheduling, channel assignment

Yuliang Tang; Yan Yao; Xinrong Lin

2009-06-01T23:59:59.000Z

114

Balance Calibration A Method for Assigning a Direct-Reading Uncertainty to an Electronic Balance.  

SciTech Connect

Paper Title: Balance Calibration A method for assigning a direct-reading uncertainty to an electronic balance. Intended Audience: Those who calibrate or use electronic balances. Abstract: As a calibration facility, we provide on-site (at the customers location) calibrations of electronic balances for customers within our company. In our experience, most of our customers are not using their balance as a comparator, but simply putting an unknown quantity on the balance and reading the displayed mass value. Manufacturers specifications for balances typically include specifications such as readability, repeatability, linearity, and sensitivity temperature drift, but what does this all mean when the balance user simply reads the displayed mass value and accepts the reading as the true value? This paper discusses a method for assigning a direct-reading uncertainty to a balance based upon the observed calibration data and the environment where the balance is being used. The method requires input from the customer regarding the environment where the balance is used and encourages discussion with the customer regarding sources of uncertainty and possible means for improvement; the calibration process becomes an educational opportunity for the balance user as well as calibration personnel. This paper will cover the uncertainty analysis applied to the calibration weights used for the field calibration of balances; the uncertainty is calculated over the range of environmental conditions typically encountered in the field and the resulting range of air density. The temperature stability in the area of the balance is discussed with the customer and the temperature range over which the balance calibration is valid is decided upon; the decision is based upon the uncertainty needs of the customer and the desired rigor in monitoring by the customer. Once the environmental limitations are decided, the calibration is performed and the measurement data is entered into a custom spreadsheet. The spreadsheet uses measurement results, along with the manufacturers specifications, to assign a direct-read measurement uncertainty to the balance. The fact that the assigned uncertainty is a best-case uncertainty is discussed with the customer; the assigned uncertainty contains no allowance for contributions associated with the unknown weighing sample, such as density, static charges, magnetism, etc. The attendee will learn uncertainty considerations associated with balance calibrations along with one method for assigning an uncertainty to a balance used for non-comparison measurements.

Mike Stears

2010-07-01T23:59:59.000Z

115

User 'To Do' List as Soon as Beam Time is Assigned | Stanford Synchrotron  

NLE Websites -- All DOE Office Websites (Extended Search)

'To Do' List as Soon as Beam Time is Assigned 'To Do' List as Soon as Beam Time is Assigned Safety Review of Scheduled Experiments Identify potential safety issues on proposals and beam time requests. If there are any potential hazards with your samples, materials you are using, or overall set up you may be contacted by the safety office depending on the degree of the hazard indicated. If you want to bring hazardous equipment or substances to SSRL and have not previously indicated this on either your proposal or beam time request (BTR), contact the safety office immediately. Additionally, any changes you may wish to make to your proposal or BTR must be reviewed and approved by the safety office in advance. Late changes that involve potential hazards may not be possible. The experiment information provided by users is used to generate a Safety

116

Measuring the maturity of a technology : guidance on assigning a TRL.  

Science Conference Proceedings (OSTI)

This report provides guidance on how to assign a technology readiness level (TRL). The method proposed assists in assigning TRLs through a series of questions that focus on a set of unambiguous maturation metrics. This method is slightly biased towards the environment and approach to technology maturation at Sandia National Laboratories where customers and suppliers are in very close proximity to one another, allowing for supplier-customer interactions at a very early stage in technology development. The hope is that this report can serve as a practical guide to anyone trying to understand the maturity of a specific technology. Risk is reduced in system acquisition by selecting mature technologies for inclusion in system development. TRLs are used to assess the maturity of evolving technologies and therefore become part of an overall risk reduction strategy in system development.

Mitchell, John Anthony

2007-10-01T23:59:59.000Z

117

Manual of functions, assignments, and responsibilities for nuclear safety: Revision 2  

Science Conference Proceedings (OSTI)

The FAR Manual is a convenient easy-to-use collection of the functions, assignments, and responsibilities (FARs) of DOE nuclear safety personnel. Current DOE directives, including Orders, Secretary of Energy Notices, and other assorted policy memoranda, are the source of this information and form the basis of the FAR Manual. Today, the majority of FARs for DOE personnel are contained in DOE`s nuclear safety Orders. As these Orders are converted to rules in the Code of Federal Regulations, the FAR Manual will become the sole source for information relating to the functions, assignments, responsibilities of DOE nuclear safety personnel. The FAR Manual identifies DOE directives that relate to nuclear safety and the specific DOE personnel who are responsible for implementing them. The manual includes only FARs that have been extracted from active directives that have been approved in accordance with the procedures contained in DOE Order 1321.1B.

Not Available

1994-10-15T23:59:59.000Z

118

Assignment of the Raman spectra of some deuterated-BEDT-TTF superconductors.  

Science Conference Proceedings (OSTI)

We present the room-temperature Raman spectra of both the protonated and deuterated forms of kappa-(BEDT-TTF)2Cu[N(CN)2]Br, kappa-(BEDT-TTF)2Cu(NCS)2 and beta-(BEDT-TTF)2I3. Along with data for the neutral BEDT-TTF molecule these spectra are used to assign the many features in the spectra of the deuterated compounds.

Eldridge, J. E.; Wang, H. H.; Kini, A. M.; Schlueter, J. A.; Materials Science Division; Univ. of British Columbia

2002-08-01T23:59:59.000Z

119

Solving the Frequency Assignment Problem by Site Availability and Constraint Programming  

E-Print Network (OSTI)

The efficient use of bandwidth for radio communications becomes more and more crucial when developing new information technologies and their applications. The core issues are addressed by the so-called Frequency Assignment Problems (FAP). Our work investigates static FAP, where an attempt is first made to configure a kernel of links. We study the problem based on the concepts and techniques of Constraint Programming and integrate the site availability concept. Numerical simulations conducted on scenarios provided by CELAR are very promising.

Linhares, Andrea Carneiro; Peinl, Peter; Michelon, Philippe

2010-01-01T23:59:59.000Z

120

Assignment 3 MECH 6511 Due on Mar. 22, 06 Question 1  

E-Print Network (OSTI)

. Calculate the volume of air space in the walls of an expanded polystyrene foam cup of 50 kg/m3 densityAssignment 3 MECH 6511 Due on Mar. 22, 06 Question 1: The density of polystyrene is 1.05 g/cm3 (graphite): 2.25 g/cm3 . #12;Question 3: The time dependence of crystallization can be described by Avrami

Medraj, Mamoun

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Assignment 3 MECH 421 Due on Mar. 22, 06 Question 1  

E-Print Network (OSTI)

. Calculate the volume of air space in the walls of an expanded polystyrene foam cup of 50 kg/m3 densityAssignment 3 MECH 421 Due on Mar. 22, 06 Question 1: The density of polystyrene is 1.05 g/cm3 (graphite): 2.25 g/cm3 . #12;Question 3: An extruder has a barrel diameter = 5.0 inch and length = 12 ft

Medraj, Mamoun

122

On a joint temporal-spatial multi-channel assignment and routing scheme in resource-constrained wireless mesh networks  

Science Conference Proceedings (OSTI)

Use of multiple orthogonal channels can significantly improve network throughput of multi-hop wireless mesh networks (WMNs). In these WMNs where multiple channels are available, channel assignment is done either in a centralized manner, which unfortunately ... Keywords: Channel assignment, Linear programming (LP), Routing, Spatial, Temporal, Throughput, Wireless mesh networks (WMNs)

Yan Jin; Weiping Wang; Yingtao Jiang; Mei Yang

2012-05-01T23:59:59.000Z

123

Rainfall-Rate Assignment Using MSG SEVIRI DataA Promising Approach to Spaceborne Rainfall-Rate Retrieval for Midlatitudes  

Science Conference Proceedings (OSTI)

The potential of rainfall-rate assignment using Meteosat Second Generation (MSG) Spinning Enhanced Visible and Infrared Instrument (SEVIRI) data is investigated. For this purpose, a new conceptual model for precipitation processes in connection ...

Meike Khnlein; Boris Thies; Thomas Nau; Jrg Bendix

2010-07-01T23:59:59.000Z

124

Calibration Model Assignments expressed as %U3O8, Summary Table ES-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1. Assignments for Logging Models ES-1. Assignments for Logging Models Model Location Primary Use a Enriched-Zone Grade % e U 3 O 8 b ppm e U b Enriched- Zone Thickness (ft) b Enriched- Zone Moisture (wt-%) c Dry Bulk Density (g/cc) c U1 U2 U3 WF N3 D U A1 A2 A3 Grand Junction, Colorado TC TC TC TC TC FN KUT FN FN FN 2.636 ± 0.082 1.229 ± 0.038 0.4516 ± 0.0091 0.3003 ± 0.0053 0.2310 ± 0.0041 0.0772 ± 0.0012 0.05569 ± 0.00097 0.03051 ± 0.00044 0.0794 ± 0.0012 0.1611 ± 0.0024 22355 ± 697 10424 ± 326 3830 ± 77 2547 ± 45 1959 ± 35 654.5 ± 9.8 472.3 ± 8.2 258.7 ± 3.7 673.5 ± 9.8 1366 ± 20 4.06 ± 0.01 4.01 ± 0.00 4.01 ± 0.00 4.02 ± 0.00 4.19 ± 0.00 5.80 ± 0.00 4.98 ± 0.00 6.01 ± 0.00 5.94 ± 0.00

125

Assignment of the cysteinyl-tRNA synthetase gene (CARS) to 11p15. 5  

SciTech Connect

The attachment of each of the 20 naturally occurring amino acids to their cognate tRNA isoaccepting families is catalyzed by a specific aminoacyl-tRNA synthetase. The structural genes encoding 10 of these enzymes have been assigned to specific human chromosomes. The HARS, LARS, RARS, and TARS genes, encoding histidyl-, leucyl-, arginyl-, and threonyl-tRNA synthetases, respectively, are all located on chromosome 5( 1, 5, 7, 9, 14). The MARS (methionyl-tRNA synthetase), NARS (asparaginyl-tRNA synthetase), VARS (valyl-tRNA synthetase), and WARS (tryptophanyl-tRNA synthetase) genes have been assigned to chromosomes 12, 18, 6, and 14, respectively (3, 4, 6, 8). A gene originally identified as encoding glutaminyl-tRNA synthetase was mapped to chromosome 1q32-q42 (10). However, a recent study suggests that the product of this gene is, in fact, a multifunctional enzyme with both glutamyl- and prolyl-tRNA synthetase activities (2). The fact that 4 of the 10 aminoacyl-tRNA synthetase genes already mapped are located on chromosome 5 may be fortuitous but might also indicate an evolutionary or regulatory relatedness. It is therefore, of interest to map genes encoding other aminoacyl-tRNA synthetases to determine if additional examples of synteny exist. The recent isolation of cDNA and genomic DNA clones for human cysteinyl-tRNA synthetase has now enabled us to map the CARS gene to segment p15.5 on chromosome 11 by fluorescence in situ hybridization.

Cruzen, M.E.; Bengtsson, U.; McMahon, J.; Wasmuth, J.J.; Arfin, S.M. (Univ. of California, Irvine (United States))

1993-03-01T23:59:59.000Z

126

GIAC Security Essentials Certification (GSEC) Practical Assignment Version 1.4b  

E-Print Network (OSTI)

While working for a multinational Original Equipment Manufacturer as a network administrator, the internal network degraded during a worm attack, management wanted the network to be assessed. The network team had been assigned to conduct a risk assessment of our companys internal network security. We started prioritizing the risks by classifying them as at high, medium and low. The team then recommended a few solutions to address these risks. After publishing the risk assessment report, the team identified a few areas to be fixed as soon as possible. First, the Wide Area Network (WAN) and Local Area Network (LAN) were not fully secured. Second, there was no separation of network services by function. Third, we audited the office environment and found Rogue Wireless Access Points connecting to the office network. Fourth, we found development labs network having many vulnerable workstations and servers. To start, we decided to secure our WAN and deploy IPSec VPN technology on top of a frame-relay PVC network with Quality of Service (QoS) Key fingerprint = AF19 FA27 2F94 998D FDB5 DE3D F8B5 06E4 A169 4E46

Jia Cherng Lee; Ded Fb E A E

2003-01-01T23:59:59.000Z

127

Perry County, Tennessee: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

87.8942451° 87.8942451° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.6786596,"lon":-87.8942451,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

128

Perry County, Indiana: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

3°, -86.6611083° 3°, -86.6611083° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.0159043,"lon":-86.6611083,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

129

Perry County, Kentucky: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

3.2077645° 3.2077645° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.3160706,"lon":-83.2077645,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

130

Perry County, Mississippi: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

9.0179332° 9.0179332° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.1673115,"lon":-89.0179332,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

131

Perry County, Illinois: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

89.3226954° 89.3226954° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.0612022,"lon":-89.3226954,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

132

Perry County, Pennsylvania: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

°, -77.2405153° °, -77.2405153° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.371376,"lon":-77.2405153,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

133

Perry County, Missouri: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

23555°, -89.7755338° 23555°, -89.7755338° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.723555,"lon":-89.7755338,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

134

Perry County, Alabama: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

3016132° 3016132° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.598888,"lon":-87.3016132,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

135

a perry descent conjugate gradient method with restricted spectrum ...  

E-Print Network (OSTI)

Thus, the global convergence is proven by the spectral analysis for non- ...... formed on PC, Intel(R) Core(TM) 2 Duo, E4600 2.40GHz 2.39GHz, RAM. 2.00 GB

136

P.T. (Perry) Jones - Research Staff - Center for Transportation...  

NLE Websites -- All DOE Office Websites (Extended Search)

testing and test development Green Racing Working Group Marine propulsion integration E85 Flex Fuel System Design and Release Vehicle Structures testing and off-highway mobility...

137

Perry County, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ohio: Energy Resources Ohio: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 39.7641353°, -82.2583297° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7641353,"lon":-82.2583297,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

138

Perry Heights, Ohio: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

0.7953357°, -81.4734515° 0.7953357°, -81.4734515° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7953357,"lon":-81.4734515,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

139

Perry Park, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

2566575°, -104.9924844° 2566575°, -104.9924844° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.2566575,"lon":-104.9924844,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

140

Storage assignment problem with travel distance and blocking considerations for a picker-to-part order picking system  

Science Conference Proceedings (OSTI)

Order picking is a key operation in managing a warehouse efficiently. Most previous studies on picking only considered single-picker operation; however, many pickers frequently work concurrently in the same region. Since congestion may occur in such ... Keywords: Multi-picker operations, Order picking, Storage assignment policy, Warehouse management

Jason Chao-Hsien Pan; Po-Hsun Shih; Ming-Hung Wu

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Optimal placement and channel assignment of relay stations in heterogeneous wireless mesh networks by modified Bender's decomposition  

Science Conference Proceedings (OSTI)

Fixed Broadband Wireless Access (FBWA) technology is designed to serve as a wireless DSL replacement to provide broadband Internet access in underserved areas where no other access technology exists. Due to the enormousness of the target service area, ... Keywords: Bender's decomposition, Fixed broadband wireless access, Mathematical programming/optimization, Placement and channel assignment, Relay stations

Aaron So; Ben Liang

2009-01-01T23:59:59.000Z

142

CSY3019 -Graphics Programming Assignment 2: Development of 2D/3D graphics software: Java 3D (50%)  

E-Print Network (OSTI)

CSY3019 - Graphics Programming Assignment 2: Development of 2D/3D graphics software: Java 3D (50, directional, point and spot lighting (to model windows and/or strip lights). · User defined or loaded geometry. Front Sheet & Title Page · Table of contents · Introduction · Analysis · Design · Implementation

Hill, Gary

143

Delay-Jitter aware slot assignment for Real-Time applications in wireless multimedia ad hoc sensor networks  

Science Conference Proceedings (OSTI)

This paper presents a distributed time slot assignment algorithm which adopts TDMA as medium access control, specially suited to support applications with tight delay, jitter and throughput requirements in convergecast traffic network, e.g. wireless ... Keywords: Congestion, Delay, Jitter, QoS, Sensor network

Liqiang Tao; Fengqi Yu

2012-09-01T23:59:59.000Z

144

A Heuristic Method for Co-optimization of Pin Assignment and Droplet Routing in Digital Microfluidic Biochip  

Science Conference Proceedings (OSTI)

Design automation in Digital micro fluidic biochip is of immense importance in to days clinical diagnosis process. In this paper, we try to build a heuristic algorithm to simultaneously perform droplet routing and electrode actuation. The proposed method ... Keywords: Digital microfluidic biochip, Droplet routing, Pin assignment, Co-optimization heuristic

Ritwik Mukherjee; Hafizur Rahaman; Indrajit Banerjee; Tuhina Samanta; Parthasarathi Dasgupta

2012-01-01T23:59:59.000Z

145

Rate-adaption channel assignment and routing algorithm for multi-channel wirelessMAN mesh networks  

Science Conference Proceedings (OSTI)

Wireless mesh networks provide an easy deployed and extensible solution to access Internet or communicate with each other for both enterprises and individuals. With the help of multi-channel and multi-radio, wireless mesh network can support more traffic ... Keywords: IEEE 802.16, channel assignment, rate-adaption, routing, wireless mesh network

Eric Hsiao-Kuang Wu; Wei-Li Chang; Hsuan-Hao Chan

2007-07-01T23:59:59.000Z

146

September 10, 2003, Board Public Meeting Presentations - Lessons Learned from Nuclear Power Industry  

NLE Websites -- All DOE Office Websites (Extended Search)

NUCLEAR REGULATORY COMMISSION NUCLEAR REGULATORY COMMISSION UNITED STATES NUCLEAR REGULATORY COMMISSION DAVIS DAVIS - - BESSE REACTOR VESSEL HEAD DEGRADATION BESSE REACTOR VESSEL HEAD DEGRADATION LESSONS LEARNED TASK FORCE LESSONS LEARNED TASK FORCE DEFENSE NUCLEAR FACILITIES SAFETY BOARD DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC MEETING PUBLIC MEETING September 10, 2003 September 10, 2003 Ed Hackett, Project Director Ed Hackett, Project Director Project Directorate II Project Directorate II Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission EMH1@NRC.GOV EMH1@NRC.GOV DAVIS DAVIS - - BESSE RACTOR VESSEL HEAD DEGRADATION BESSE RACTOR VESSEL HEAD DEGRADATION BACKGROUND BACKGROUND FEBRUARY, 2002 FEBRUARY, 2002 -

147

Photodissociation of carbon dioxide in singlet valence electronic states. II. Five state absorption spectrum and vibronic assignment  

E-Print Network (OSTI)

The absorption spectrum of CO$_2$ in the wavelength range 120\\,nm --- 160\\,nm is analyzed by means of quantum mechanical calculations performed using vibronically coupled PESs of five singlet valence electronic states and the coordinate dependent transition dipole moment vectors. The thermally averaged spectrum, calculated for T=190\\,K via Boltzmann averaging of optical transitions from many initial rotational states, accurtely reproduces the experimental spectral envelope, consisting of a low and a high energy band, the positions of the absorption maxima, their FWHMs, peak intensities, and frequencies of diffuse structures in each band. Contributions of the vibronic interactions due to Renner-Teller coupling, conical intersections, and the Herzberg-Teller effect are isolated and the calculated bands are assigned in terms of adiabatic electronic states. Finally, diffuse structures in the calculated bands are vibronically assigned using wave functions of the underlying resonance states. It is demonstrated that...

Grebenshchikov, Sergy Yu

2013-01-01T23:59:59.000Z

148

Computer processing of mass-spectral data. Part V. Assignment of formulas to experimental masses. Representative databases for program FZM  

SciTech Connect

Program FZM assigns formulas to masses using databases generated with respect to the /sup 14/CH/sub 2/, /sup 50/CF/sub 2/, /sup 82/CCl/sub 2/, and /sup 170/Cbr/sub 2/ homologous-unit (Dendrick) mass Scales by program DBG. Each database consists of formula codes and fractional Kendrick masses grouped into 14 nominal-mass Z series tables. The formula codes in each table are arranged in order of decreasing fractional mass. In order to verify correct implementation of programs DBG and FZM and to allow manual application of the formula-assignment process, a database is reproduced for each homologous unit. The input parameters to program DBG required to generate each database are listed. The process of determining the formulas whose masses lie within a region 2 delta about the experimental mass is illustrated for each database.

Chung, K.C.; Hwang, C.S.; Scheppele, S.E.

1983-02-01T23:59:59.000Z

149

Assigned Keyword List  

Science Conference Proceedings (OSTI)

... mgf1 Mathematics - perturbation theory: mpt1 Mathematics ... shift: muls1 Muonium energy levels: muel1 ... thermometry: noth1 Nuclear charge radius ...

150

Assignment 4 - CECM  

E-Print Network (OSTI)

Note, one way to clean up your Groebner basis G is to use Maple and compute and return Groebner[Basis](G,M) where M is the monomial ordering e.g. plex(x,y ...

151

Assignment 5 (.txt) - CECM  

E-Print Network (OSTI)

Study the proof of property 2 of section 4.2, the "row interchange property", ... satisfying f(0)=1, f(1)=1, f(2)=-1, using, firstly, the standard basis {1,x,x^2} for f(x),...

152

Assignment 5 (.pdf) - CECM  

E-Print Network (OSTI)

Dec 3, 2012 ... B at a rate and chemical B is converted to C at a rate of as illustrated in the ... To do this you need to convert from a set of functions to .... form a small equilateral triangle from the middle edge but omit the base (the dotted line).

153

Assignment 5 (.pdf) - CECM  

E-Print Network (OSTI)

the first n such that the largest coefficient of ?n(x) is 3 in magnitude. Note: if ? is an ... They are over the cyloctomic fields of order k = 5, 3, and 24 respectively.

154

Assignment 5 (.pdf) - CECM  

E-Print Network (OSTI)

Michigan 4.PI. 158. Erie. 0.46. 1RQ 5. S ntario 1.6. 20 I. QuestionUT : Second order6V DEs. (a) Do problem 5.2 in the text.W$ ive one set of values forWX , Y...

155

Assignment 6 - CECM  

E-Print Network (OSTI)

Additional exercises Note, Q = field of rational numbers, R = real numbers, ... m(x) in Q[x] for (i) alpha = sqrt(2)+sqrt(3)+sqrt(5) and (ii) beta = 1+2^(1/2)+2^(1/4).

156

METHODOLOGY & CALCULATIONS FOR THE ASSIGNMENT OF WASTE GROUPS FOR THE LARGE UNDERGROUND WASTE STORAGE TANKS AT THE HANFORD SITE  

DOE Green Energy (OSTI)

Waste stored within tank farm double-shell tanks (DST) and single-shell tanks (SST) generates flammable gas (principally hydrogen) to varying degrees depending on the type, amount, geometry, and condition of the waste. The waste generates hydrogen through the radiolysis of water and organic compounds, thermolytic decomposition of organic compounds, and corrosion of a tank's carbon steel walls. Radiolysis and thermolytic decomposition also generates ammonia. Nonflammable gases, which act as dilutents (such as nitrous oxide), are also produced. Additional flammable gases (e.g., methane) are generated by chemical reactions between various degradation products of organic chemicals present in the tanks. Volatile and semi-volatile organic chemicals in tanks also produce organic vapors. The generated gases in tank waste are either released continuously to the tank headspace or are retained in the waste matrix. Retained gas may be released in a spontaneous or induced gas release event (GRE) that can significantly increase the flammable gas concentration in the tank headspace as described in RPP-7771. The document categorizes each of the large waste storage tanks into one of several categories based on each tank's waste characteristics. These waste group assignments reflect a tank's propensity to retain a significant volume of flammable gases and the potential of the waste to release retained gas by a buoyant displacement event. Revision 5 is the annual update of the methodology and calculations of the flammable gas Waste Groups for DSTs and SSTs.

BARKER, S.A.

2006-07-27T23:59:59.000Z

157

METHODOLOGY & CALCULATIONS FOR THE ASSIGNMENT OF WASTE FOR THE LARGE UNDERGROUND WASTE STORAGE TANKS AT THE HANFORD SITE  

DOE Green Energy (OSTI)

Waste stored within tank farm double-shell tanks (DST) and single-shell tanks (SST) generates flammable gas (principally hydrogen) to varying degrees depending on the type, amount, geometry, and condition of the waste. The waste generates hydrogen through the radiolysis of water and organic compounds, thermolytic decomposition of organic compounds, and corrosion of a tank's carbon steel walls. Radiolysis and thermolytic decomposition also generates ammonia. Nonflammable gases, which act as dilutents (such as nitrous oxide), are also produced. Additional flammable gases (e.g., methane) are generated by chemical reactions between various degradation products of organic chemicals present in the tanks. Volatile and semi-volatile organic chemicals in tanks also produce organic vapors. The generated gases in tank waste are either released continuously to the tank headspace or are retained in the waste matrix. Retained gas may be released in a spontaneous or induced gas release event (GRE) that can significantly increase the flammable gas concentration in the tank headspace as described in RPP-7771, Flammable Gas Safety Isme Resolution. Appendices A through I provide supporting information. The document categorizes each of the large waste storage tanks into one of several categories based on each tank's waste and characteristics. These waste group assignments reflect a tank's propensity to retain a significant volume of flammable gases and the potential of the waste to release retained gas by a buoyant displacement event. Revision 6 is the annual update of the flammable gas Waste Groups for DSTs and SSTs.

TU, T.A.

2007-01-04T23:59:59.000Z

158

METHODOLOGY & CALCULATIONS FOR THE ASSIGNMENT OF WASTE FOR THE LARGE UNDERGROUND WASTE STORAGE TANKS AT HANFORD SITE [SEC 1 & 2  

DOE Green Energy (OSTI)

Waste stored within tank farm double-shell tanks (DST) and single-shell tanks (SST) generates flammable gas (principally hydrogen) to varying degrees depending on the type, amount, geometry, and condition of the waste. The waste generates hydrogen through the radiolysis of water, thermolytic decomposition of organic compounds, and corrosion of a tank's carbon steel walls. Radiolysis and thermolytic decomposition also generate ammonia. Nonflammable gases, which act as diluents (such as nitrous oxide), are also produced. Additional flammable gases (e.g., methane) are generated by chemical reactions between various degradation products of organic chemicals present in the tanks. Volatile and semivolatile organic chemicals in tanks also produce organic vapors. The generated gases in tank waste are either released continuously to the tank headspace or are retained in the waste matrix. Retained gas may be released in a spontaneous or induced gas release event (GRE) that can significantly increase the flammable gas concentration in tank headspace as described in RPP-7771, Flammable Gas Safety Issue Resolution. Appendices A through L provide supporting information. This document categorizes each of the large waste storage tanks into one of several categories based on each tank's waste and characteristics. These waste group assignments reflect a tank's propensity to retain a significant volume of flammable gases and the potential of the waste to release retained gas by a buoyant displacement event.

BARKER, S.A.; HEDENGREN, D.C.

2003-08-28T23:59:59.000Z

159

PHYS C1601 Solution to Optional Problem from Assignment 5 [1] Energy stored in elastic equals gravitational potential energy which is mass times dis-  

E-Print Network (OSTI)

PHYS C1601 Solution to Optional Problem from Assignment 5 [1] Energy stored in elastic equals gravitational potential energy which is mass times dis- tance dropped. Thus (1) E0.34kG = 34kG 0.36m g = 120J energy. Specifically, if the initial velocity has x and z components vx,z, the initial position

Millis, Andrew

160

Time efficient heuristics for cell-to-switch assignment in quasi-static/dynamic location area planning of mobile cellular networks  

Science Conference Proceedings (OSTI)

This paper presents a set of time efficient, sub-optimal heuristics to solve the problem of assigning cells to mobile switching centers (or, switches in short) for an effective location area (LA) planning in a mobile cellular network (MCN). A common ... Keywords: CSA, Cellular networks, Clustering and heuristics, Handoff, Hybrid cost, Load balancing, Location area partitioning, Mobile communication, Optimization

Debashis Saha; Partha S. Bhattacharjee; Amitava Mukherjee

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Assignment of the sup 1 H and sup 15 N NMR spectra of Rhodobacter capsulatus ferrocytochrome c sub 2  

Science Conference Proceedings (OSTI)

The peptide resonances of the {sup 1}H and {sup 15}N nuclear magnetic resonance spectra of ferrocytochrome c{sub 2} from Rhodobacter capsulatus are sequentially assigned by a combination of 2D {sup 1}H-{sup 1}H and {sup 1}H-{sup 15}N spectroscopy, the latter performed on {sup 15}N-enriched protein. Short-range nuclear Overhauser effect (NOE) data show {alpha}-helices from residues 3-17, 55-65, 69-88, and 103-115. Within the latter two {alpha}-helices, there are three single 3{sub 10} turns, 70-72, 76-78, and 107-109. In addition {alpha}H-NH{sub i+1} and {alpha}H-NH{sub i+2} NOEs indicate that the N-terminal helix (3-17) is distorted. Compared to horse or tuna cytochrome c and cytochrome c{sub 2} of Rhodospirillium rubrum, there is a 6-residue insertion at residues 23-29 in R. capsulatus cytochrome c{sub 2}. The NOE data show that this insertion forms a loop, probably an {Omega} loop. {sup 1}H-{sup 15}N heteronuclear multiple quantum correlation experiments are used to follow NH exchange over a period of 40 h. As the 2D spectra are acquired in short time periods (30 min), rates for intermediate exchanging protons can be measured. Comparison of the NH exchange data for the N-terminal helix of cytochrome c{sub 2} of R. capsulatus with the highly homologous horse heart cytochrome c shows that this helix is less stable in cytochrome c{sub 2}.

Gooley, P.R.; Caffrey, M.S.; Cusanovich, M.A.; MacKenzie, N.E. (Univ. of Arizona, Tucson (USA))

1990-03-06T23:59:59.000Z

162

Eliminating livelock by assigning the same priority state to each message that is inputted into a flushable routing system during N time intervals  

DOE Patents (OSTI)

Livelock-free message routing is provided in a network of interconnected nodes that is flushable in time T. An input message processor generates sequences of at least N time intervals, each of duration T. An input register provides for receiving and holding each input message, where the message is assigned a priority state p during an nth one of the N time intervals. At each of the network nodes a message processor reads the assigned priority state and awards priority to messages with priority state (p-1) during an nth time interval and to messages with priority state p during an (n+1) th time interval. The messages that are awarded priority are output on an output path toward the addressed output message processor. Thus, no message remains in the network for a time longer than T.

Faber, Vance (Los Alamos, NM)

1994-01-01T23:59:59.000Z

163

Eliminating livelock by assigning the same priority state to each message that is input into a flushable routing system during N time intervals  

DOE Patents (OSTI)

Livelock-free message routing is provided in a network of interconnected nodes that is flushable in time T. An input message processor generates sequences of at least N time intervals, each of duration T. An input register provides for receiving and holding each input message, where the message is assigned a priority state p during an nth one of the N time intervals. At each of the network nodes a message processor reads the assigned priority state and awards priority to messages with priority state (p-1) during an nth time interval and to messages with priority state p during an (n+1) th time interval. The messages that are awarded priority are output on an output path toward the addressed output message processor. Thus, no message remains in the network for a time longer than T. 4 figures.

Faber, V.

1994-11-29T23:59:59.000Z

164

Computer processing of mass-spectral data. Part III. Assignment of formulas to experimental masses. Algorithms and structures of programs DBG, FZM, and FZMIN  

Science Conference Proceedings (OSTI)

A computer method for the assignment of formulas to experimental masses has been developed. Programs FZM, DBG and FZMIN are the main programs controlling the procedures for processing the exprerimental masses. The main purpose of this document is to describe the development of these programs and the associated alborithms. Program FZM assigns formulas to the experimental masses using a pregenerated database. A database is generated by program DBG with respect to one of the homologous units CH/sub 2/, CF/sub 2/, CCl/sub 2/, or CBr/sub 2/ using a formula-acceptability-criterion-based bound and branched combinatorial algorithm as part of the formula-assignment process. Program FZM calculates the correct mass number of a species from its experimental mass on the appropriate Kendrick-mass scale and the truncating factor calculated by program DBG for the current database in order to locate the correct database table. The homologous-unit-mass-scale fractional masses in this table which lie within the user-specified region about the experimental Kendrick fractional mass are retrieved using a binary and linear search algorithm. The formula codes associated with these fractional masses are decoded. Program FZMIN admits on-line acquired mass spectral data to program FZM or remote execution.

Chung, K.C.; Barker, G.A.; Hedrick, G.E.

1982-12-01T23:59:59.000Z

165

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

166

Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety and Security Safety and Security Report to the Secretary on the Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 February 2011 Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS Table of Contents 1.0 Introduction ......................................................................................................................... 1 2.0 Department-wide Action Plan for the Columbia Accident and Davis-Besse Event ........... 3 3.0 Comprehensive Operating Experience Program ................................................................. 5

167

Computer processing of mass-spectral data. Part IV. Assignment of formulas to experimental masses. Source listings of programs DBG, FZM, and FZMIN  

SciTech Connect

A versatile and efficient computer method for processing masses has been developed. Program FZM assigns formulas and specific Z values to masses using a pregenerated database. The databases are generated by program DBG. Program FZMIN admits either on-line or off-line acquired data to program FZM for remote execution. Source listings of the three FORTRAN programs are reproduced to provide both a reference to be used in conjunction with the external documentation of the method and a means to code check programs reproduced on requestor-furnished magnetic tape.

Chung, K.C.; Barker, G.A.; Hedrick, G.E.

1982-12-01T23:59:59.000Z

168

A confirmative spin-parity assignment for the key 6.15 MeV state in $^{18}$Ne of astrophysical importance  

E-Print Network (OSTI)

Proton resonant states in $^{18}$Ne have been investigated by the resonant elastic scattering of $^{17}$F+$p$. The $^{17}$F beam was separated by the CNS radioactive ion beam separator (CRIB), and bombarded a thick H$_2$ gas target at 3.6 MeV/nucleon. The recoiled light particles were measured by using three sets of ${\\Delta}$E-E Si telescope at scattering angles of $\\theta$$_{lab}$$\\approx 3^\\circ$, 10$^\\circ$ and 18$^\\circ$, respectively. Four resonances, {\\it i.e.}, at $E_{x}$=6.15, 6.30, 6.85, and 7.05 MeV, were observed clearly. By $R$-matrix analysis of the excitation functions, $J^{\\pi}$=1$^-$ was firmly assigned to the 6.15 MeV state which is a key state in calculating the reaction rate of $^{14}$O($\\alpha$,$p$)$^{17}$F reaction. This reaction was thought to be one of the most probable key reactions for the breakout from the hot-CNO cycle to the $rp$-process in type I x-ray bursts In addition, a new excited state observed at $E_{x}$=6.85 MeV was tentatively assigned as 0$^{-}$, which could be the analog state of 6.880 MeV, 0$^{-}$ in mirror $^{18}$O.

J. Hu; J. J. He; S. W. Xu; H. Yamaguchi; K. David; P. Ma; J. Su; H. W. Wang; T. Nakao; Y. Wakabayashi; T. Teranishi; J. Y. Moon; H. S. Jung; T. Hashimoto; A. Chen; D. Irvine; S. Kubono

2013-06-17T23:59:59.000Z

169

Assignment of near-edge x-ray absorption fine structure spectra of metalloporphyrins by means of time-dependent density-functional calculations  

Science Conference Proceedings (OSTI)

The C 1s and N 1s near-edge x-ray absorption fine structure (NEXAFS) spectra of three prototype tetraphenyl porphyrin (TPP) molecules are discussed in the framework of a combined experimental and theoretical study. We employ time-dependent density-functional theory (TDDFT) to compute the NEXAFS spectra of the open- and closed-shell metalloporphyrins CoTPP and ZnTPP as well as the free-base 2HTPP in realistic nonplanar conformations. Using Becke's well-known half-and-half hybrid functional, the computed core excitation spectra are mostly in good agreement with the experimental data in the low-energy region below the appropriate ionization threshold. To make these calculations feasible, we apply a new, simple scheme based on TDDFT using a modified single-particle input spectrum. This scheme is very easy to implement in standard codes and allows one to compute core excitation spectra at a similar cost as ordinary UV/vis spectra even for larger molecules. We employ these calculations for a detailed assignment of the NEXAFS spectra including subtle shifts in certain peaks of the N 1s spectra, which depend on the central coordination of the TPP ligand. We furthermore assign the observed NEXAFS resonances to the individual molecular subunits of the investigated TPP molecules.

Schmidt, Norman; Fink, Rainer [Department Chemie und Pharmazie, Lehrstuhl fuer Physikalische Chemie II and ICMM, Universitaet Erlangen-Nuernberg, Egerlandstrasse 3, 91058 Erlangen (Germany); Hieringer, Wolfgang [Department Chemie und Pharmazie, Lehrstuhl fuer Theoretische Chemie, Universitaet Erlangen-Nuernberg, Egerlandstrasse 3, 91058 Erlangen (Germany)

2010-08-07T23:59:59.000Z

170

Program Assignments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advisory Group (PPAG) Representative Small Business Outreach Program Representative STRIPES On-Site Administrator VPO Content Manager Webmaster Mary Jones - 287-1570 Past...

171

Workshop Attendees and Dialogue Assignments  

Science Conference Proceedings (OSTI)

... Room 234 Room 203 Nancy Horton Energy Industries of Ohio ... Room 207 Room 234 Michele Kennedy Fox Run Systems & Solutions ...

2012-07-31T23:59:59.000Z

172

Customer Name: (First name, middle initial, last name) Social Security Number or Federal ID Number TAMU Customer Number (if assigned) Customer Information: Persons authorized to make purchases on this account  

E-Print Network (OSTI)

Customer Name: (First name, middle initial, last name) Social Security Number or Federal ID Number TAMU Customer Number (if assigned) Customer Information: Persons authorized to make purchases: Email Address: Phone: Fax: Phone: Fax: Name: Title: Customer Representative Signature: Date: This form

Meagher, Mary

173

DOE Durability Working Group May 2011 Meeting Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Durability Working Group Wednesday, May 11, 2011, 7:00-10:00 pm Marriott Crystal Gateway "Salon V" (Ballroom Level) Meeting Agenda 7:00 pm Welcome and introductory comments Debbie Myers (Argonne) and Rod Borup (Los Alamos) - co-chairs 7:10 pm Compilation of decay mechanisms, impact, evidence, and diagnostic procedures Proposed by: Adam Weber (LBNL), Mike Perry (UTRC) Assigned to: Debbie Myers, Rod Borup, Rangachary Mukundan (LANL) 7:30 pm PEFC start-up protocol Assigned to: Greg James (Ballard) - lead, Rod Borup (LANL), Mike Perry (UTRC) 7:50 pm Accelerated stress test for non-carbon supports (e.g., metal oxides) Proposed by: Shyam Kocha (NREL), Assigned to: Shyam Kocha (NREL) - lead Mahlon Wilson and Eric Brosha (LANL) 8:10 pm Discussion of electrochemical equivalent of accelerated stress test for MEAs

174

Forecasting the Population of Census Tracts by Age and Sex: An Example of the HamiltonPerry Method in Action  

E-Print Network (OSTI)

approach to economic forecasting and policy analysis.for K-12 enrollment forecasting. Educational Research65 and 69 85 and over Forecasting the Population of Census

Swanson, David A.; Schlottmann, Alan; Schmidt, Bob

2010-01-01T23:59:59.000Z

175

Office of Health, Safety and Security Report to the Secretary of Energy -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Health, Safety and Security Report to the Secretary of Office of Health, Safety and Security Report to the Secretary of Energy - February 2011 Office of Health, Safety and Security Report to the Secretary of Energy - February 2011 February 2011 Status and Effectiveness of DOE Efforts to Learn from Internal and External Operating Experience in Accordance with Commitment #20 of the DOE Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2004-1 The Department of Energy (DOE) Office of Health, Safety and Security (HSS) performed an effectiveness review of the DOE Action Plan for the Columbia space shuttle accident and Davis-Besse event and the comprehensive operating experience program. The review was performed to fulfill Commitment #20 of the DOE Implementation Plan to Improve Oversight of

176

MATH 158 Assignment 2, Spring 2013 - CECM  

E-Print Network (OSTI)

Feb 4, 2013 ... For exercise 60, the current yearly production rate is 20 million tons per year and they want to increase it by 2te-0.05t tons per year. The way I...

177

Stability issues for dynamic traffic assignment  

Science Conference Proceedings (OSTI)

This paper explores stability issues for operational route guidance control strategies for vehicular traffic networks equipped with advanced information systems, and develops a general procedure for the stability analysis of the associated dynamic traffic ... Keywords: Dynamical systems, Feedback control, Lyapunov methods, Stability analysis

S. Peeta; T. -H. Yang

2003-01-01T23:59:59.000Z

178

JOBAID-ASSIGNING AN ALTERNATE SUPERVISOR (SUPERVISOR)  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this job aid is to guideyou through the step-by-step process of managing alternate supervisors within SuccessFactors Learning.

179

Paper Number (Assigned by IFPE Staff)  

E-Print Network (OSTI)

Instruction and the Stirling Engine Project for 2.670: M.E. Tools," S.B. dissertation, MIT Dept. of Mech. Eng

Li, Perry Y.

180

Genome Annotation Project Assignment Bioinformatics module 2009  

E-Print Network (OSTI)

generally accepted. This is not just a thing of the distant past [1]. Did you observe a similar outcome://www.geneprediction.org/. If you are up for installing software, we of course recommend EvoGene [9], but you may want to explore that is homologous to your human core data set. The more distant the species are, the stronger the signal left

Goldschmidt, Christina

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Continuous Learning Points Credit Assignment Table | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Policy Flash 2013-54 Acquisition Certification Program Handbook 4th Edition Acquisition Certifications Program Handbook Certification and Equivalency...

182

CSI 1390A -Assignment 1 Instructions  

E-Print Network (OSTI)

Write a program in Java that asks the user to input: The number of gallons of gas in the tank The fuel in Java that calculates the area of a circle. The program asks the user to input the radius from the keyboard. The area of a circle is calculated as indicated below Area = 2 * 3.141592654 * Radius Question 4

Stojmenovic, Ivan

183

The recoverable robust tail assignment problem  

E-Print Network (OSTI)

using column generation in the master and subproblems of the Benders ...... described by (36)-(41) is a network flow problem with one source and multiple sink.

184

Resource Assignment in Hierarchical Multiple Resource Systems  

E-Print Network (OSTI)

Beauregard 2 Department of Mathematics and Computing Science Eindhoven University of Technology PO Box 513

van Gorp, Paul

185

MACM 202 Assignment 5, Spring 2004 - CECM  

E-Print Network (OSTI)

Michigan 4.9. 158. Erie. 0.46. 175. Ontario. 1.6. 209. Question 3: Second order ODEs. (a) Do problem 5.2 in the text. Give one set of values for L; R; C such that...

186

MACM 202 Assignment 5, Fall 2005 - CECM  

E-Print Network (OSTI)

Michigan 4.9. 158. Erie. 0.46. 175. Ontario. 1.6. 209. 2. Let x(t) denote a fish population at time t. Consider models of the form x (t) = G(x) ? H(x, t) where G(x)...

187

MATH 158 Assignment 3, Spring 2013 - CECM  

E-Print Network (OSTI)

(a) In which year did the oil well reach a maximum production rate? (b) Sketch the graph of R(t) for 0 ? t ? 20. (c) How much oil has it produced so far? (d) If the ...

188

MATH 158 Assignment 3, Spring 2011 - CECM  

E-Print Network (OSTI)

(a) In which year did the oil well reach a maximum production rate? (b) Sketch the graph of R(t) for 0 ? t ? 20. (c) How much oil has it produced so far? (d) If it is ...

189

Estimating Bounds for Quadratic Assignment Problems Associated ...  

E-Print Network (OSTI)

Manhattan Distance Matrices based on ... trix for a hypercube or a Manhattan distance matrix for a rectangular grid ...... Solving lift-and-project relaxations of.

190

Exact Solution of Emerging Quadratic Assignment Problems  

E-Print Network (OSTI)

National Science Foundation under grant No. DMI-. 0400155. .... Process Allocation Problem of Sofianopoulous ([63] and. [64]), the ...... lower bound is tight

191

Enhancing Transportation Education through On-line Simulation Using an Agent-based Demand and Assignment Model (07-0533) presented at the 86th Annual Meeting of the Transportation Research Board in  

E-Print Network (OSTI)

This research explores the effectiveness of using simulation as a tool for enhancing classroom learning in the Civil Engineering Department of the University of Minnesota at Twin Cities. The authors developed a modern transportation planning software package, Agent-based Demand and Assignment Model (ADAM), that is consistent with our present understanding of travel behavior, that is platform independent, and that is easy to learn and is thus usable by students. An in-class project incorporated ADAM and the performance of this education strategy was evaluated through pre-class survey, post-class survey, scores in the quiz focusing on travel demand modeling and final scores. Results showed that ADAM effectively enhanced students self-reported understanding of transportation planning and their skills of forming opinions, evaluating projects and making judgments. Students of some learning styles were found to benefit more than others through simulation-based teaching strategy. Findings in this research could have significant implications for future practice of simulation-based teaching strategy.

Shanjiang Zhu; Feng Xie; David Levinson

2007-01-01T23:59:59.000Z

192

M. Bahrami ENSC 388 Assignment # 1 1 Assignment #1 (Basic Concepts)  

E-Print Network (OSTI)

) Both a gage and a manometer are attached to a gas tank to measure its pressure. If the reading gas in the balloon. To calculate maximum load, mass of helium must subtracted from the maximum mass so filled with helium gas because it weighs only about one-seventh of what air weighs under identical

Bahrami, Majid

193

M. Bahrami ENSC 461 (S 11) Assignment 2 1 Assignment #2 (Cycles)  

E-Print Network (OSTI)

#0838874 Dynamic Modeling of a Regenerator for the Control-Based Design of Free-Piston Stirling Engines-piston Stirling engines with the goal of building a working prototype. The Stirling cycle is recast as a dynamic the potential of a new, compact free-piston Stirling engine configuration using elastomeric pistons. An engine

Bahrami, Majid

194

M. Bahrami ENSC 461 (S 11) Assignment 2 1 Assignment #2 (Cycles)  

E-Print Network (OSTI)

J. IVERSON,1 AND IAN STIRLING 2 1 Department of Biology, Dalhousie University, Halifax, Nova Scotia level (Hobson and Welch 1992) and feed on a variety of marine-mammal prey (Stirling and McEwan 1975, Stirling and Archibald 1977, Derocher et al. 2002, Iverson et al. 2006). Because of their long life span

Bahrami, Majid

195

Full differentiation and assignment of boron species in the electrolytes Li{sub 2}B{sub 6}O{sub 9}F{sub 2} and Li{sub 2}B{sub 3}O{sub 4}F{sub 3} by solid-state {sup 11}B NMR spectroscopy  

SciTech Connect

The syntheses of two new fluorooxoborates, Li{sub 2}B{sub 3}O{sub 4}F{sub 3} and Li{sub 2}B{sub 6}O{sub 9}F{sub 2}, which possess considerable ion conductivity at higher temperatures, have been reported recently. Here, we describe the characterisation of these compounds by solid-state {sup 11}B NMR spectroscopy. The complex central-transition MAS spectra, resulting from overlap of sub-spectra contributed by the individual boron species in the crystal structures, could be clearly separated by acquisition and analysis of 3QMAS spectra. By numerical fit of these sub-spectra, the isotropic chemical shift {delta}{sub iso}, the quadrupolar coupling constant {chi}, and the asymmetry {eta} were determined. Using known relations between boron coordination and chemical shift as well as quadrupolar coupling, the individual {sup 11}B NMR resonances have been ascribed to boron species in tetrahedral or trigonal environment. To remove remaining assignment ambiguities, the response of the {sup 11}B resonances to {sup 19}F decoupling was qualitatively analysed. Thus, by using the combined information conveyed by chemical shift, quadrupolar and dipolar interaction, a complete assignment of the complex {sup 11}B line shapes exhibited by the fluorooxoborates has been achieved. - Graphical abstract: Structure and solid-state {sup 11}B NMR spectrum of Li{sub 2}B{sub 3}O{sub 4}F{sub 3}. Highlights: Black-Right-Pointing-Pointer Characterisation of title compounds by solid-state {sup 11}B NMR spectroscopy. Black-Right-Pointing-Pointer Sub-spectra of boron species separated by evaluation of 3QMAS spectra. Black-Right-Pointing-Pointer Isotropic chemical shift and quadrupolar interaction parameters determined. Black-Right-Pointing-Pointer Full boron assignment based on NMR parameters and response to {sup 19}F decoupling.

Braeuniger, Thomas, E-mail: T.Braeuniger@fkf.mpg.de [Max Planck Institute for Solid State Research, Heisenbergstrasse 1, 70569 Stuttgart (Germany)] [Max Planck Institute for Solid State Research, Heisenbergstrasse 1, 70569 Stuttgart (Germany); Pilz, Thomas; Chandran, C. Vinod; Jansen, Martin [Max Planck Institute for Solid State Research, Heisenbergstrasse 1, 70569 Stuttgart (Germany)] [Max Planck Institute for Solid State Research, Heisenbergstrasse 1, 70569 Stuttgart (Germany)

2012-10-15T23:59:59.000Z

196

The Honorable Rick Perry, Governor of Texas The Honorable David Dewhurst, Lieutenant Governor of Texas The Honorable Joe Straus, Speaker of the House  

E-Print Network (OSTI)

The strategic plan outlines five priority areas that will direct the agencys focus over the next five years: quality early childhood education; educator effectiveness and equity; student achievement; school support; and data quality. These priorities will guide a comprehensive approach to providing the student population of Texas with the tools they need to meet the high academic standards and to succeed both in school and in life beyond school. Should you require additional information or have any questions regarding the strategic

Legislative Budget Board

2010-01-01T23:59:59.000Z

197

Utilization and fairness in spectrum assignment for opportunistic spectrum access  

E-Print Network (OSTI)

from its color list to maximize system utility. The coloringlist and large number of interference constraints. This limits the system utility.list becomes empty or every vertex saturates. Note that our graph coloring problem wants to maximize utility

Peng, ChunYi; Zheng, Haitao; Zhao, Ben Y

2006-01-01T23:59:59.000Z

198

Market versus Non-Market Assignment of Initial Ownership  

E-Print Network (OSTI)

Each According To? Markets, Tournaments, and the MatchingIntervention on Housing Markets in Korea, mimeo, Sogang1993), Moving toward a Market for Spectrum, Regu- lation,

Che, Yeon-Koo; Gale, Ian

2007-01-01T23:59:59.000Z

199

Dynamic data assigning assessment clustering of streaming data  

Science Conference Proceedings (OSTI)

Discovering interesting patterns or substructures in data streams is an important challenge in data mining. Clustering algorithms are very often applied to identify single substructures although they are designed to partition a data set. Another problem ... Keywords: Incremental clustering, Noise clustering, Objective function-based clustering

O. Georgieva; F. Klawonn

2008-09-01T23:59:59.000Z

200

Rack Number Assignments Location TFTR TFTR NSTX NSTX  

E-Print Network (OSTI)

and CTWH 590-599 Mechanical Equipment Room CMER 595, 596 FCPC TF Wing CTF1,CTF2 601-609 CTF1,CTF2 601-609 FCPC OH Wing COH1,3,5,CEF1,3,CCPC 651-658 COH1,3,5,CEF1,3,CCPC 651-658 FCPC 2nd Flr CCD Area CEF1, CEF3-003 C-Site MG Basement Red=may go or have gone away Green=change #12;

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

September 2012 Suggested resources for your BRIEFING NOTE ASSIGNMENT  

E-Print Network (OSTI)

://library.queensu.ca/research/databases/record/2888 Full-text of the publications of the Organisation for Economic Cooperation and Development (OECD://library.queensu.ca/research/databases/record/2810 Index and full-text of major Canadian daily newspapers. Public Administration Graduate Student subscribes are: OECD iLibrary http://library.queensu.ca/research/databases/record/2888 Full-text

Abolmaesumi, Purang

202

Solving the quadratic assignment problem by means of general ...  

E-Print Network (OSTI)

... author: cesar.beltran@urjc.es, Statistics and Operations Research, Rey Juan Car- ...... Matlab interface for cplex, http://control.ee.ethz.ch/ hybrid/cplexint.php.

203

Dynamic Routing and Wavelength Assignment in Optical Networks ...  

Science Conference Proceedings (OSTI)

node pair must be analyzed. Connections between ..... The complexity analysis is detailed in ..... lightpath pairs proposed in Mohan and Ram Murthy. [10].

204

Efficient demand assignment in multi-connected microgrids  

Science Conference Proceedings (OSTI)

With the proliferation of distributed generation, an electrical load can be satisfied either by a centralized generator or by local/nearby distributed generators. Given a set of resource demands in a collection of geographically co-located microgrids ... Keywords: switching

Kirill Kogan, Sergey Nikolenko, Srinivasan Keshav, Alejandro Lopez-Ortiz

2013-01-01T23:59:59.000Z

205

Utilization and fairness in spectrum assignment for opportunistic spectrum access  

E-Print Network (OSTI)

users channel availability and transmission power, which inits own channel availability and transmission constraints.transmission link or a broadcast access point. The channel availability

Peng, ChunYi; Zheng, Haitao; Zhao, Ben Y

2006-01-01T23:59:59.000Z

206

Effective formulation reductions for the quadratic assignment problem  

E-Print Network (OSTI)

Calculation of lower bounds is an essential component of exact QAP methods, ..... We assume that the flow matrix is symmetrical and therefore if (i, k) ? F0 then.

207

On Computation of Performance Bounds of Optimal Index Assignment  

E-Print Network (OSTI)

provide a reference, we include in the table the results of natural binary code ( NBC) that labels codewords in the order of increasing energy (average intensity of...

208

UNCLASSIFIED FOREIGN VISITS AND ASSIGNMENTS PROGRAM U.S. DEPARTMENT...  

Office of Legacy Management (LM)

subject matter expert (SME) review, host, and escort requirements to ensure: (1) that national security assets are protected; (2) that appropriate export control and technology...

209

On Computation of Performance Bounds of Optimal Index Assignment  

E-Print Network (OSTI)

Dec 1, 2010 ... X. Wu's work was supported partly by NSERC and partly by NSFC grant ... 973 Program (2010CB731401, 2010CB731406) and 863 Program.

210

The pre-audit assessment: A homework assignment for auditors  

SciTech Connect

The role of the quality assurance audit is evolving from compliance verification to a much broader assessment of programmatic and management performance. In the past, audits were poorly understood and caused fear and trepidation. Auditees turned an audit into a cat-and-mouse game using coverup strategies and decoy discrepancies. These games were meant to give the auditors what they want, namely a few findings that could later be easily corrected. At Pacific Northwest Laboratory (PNL), I observed auditing become a spectator sport. Matching a compliance-oriented auditor against a crafty group of scientists provided hours of entertainment. As a program manager, it was clear these games were neither productive useful nor cost effective. Fortunately, over the past few years several concepts embraced by total quality management' have begun to emerge at PNL. These concepts are being adopted by most successful organizations, and based on these concepts new tools and ideas are emerging to help organizations improve productivity and quality. Successful organizations have been and are continuing to develop management strategies that rely on participative approaches to their operations. These approaches encourage the empowerment of organization staff at all levels, with the goal of instilling ownership of quality in every staff member. As management philosophies are changing, so are the responsibilities and expectations of managers. Managers everywhere are experimenting with new tools to help them improve their operations and competitiveness. As the quality audit evolves, managers and other customers of the audit process have developed expectations for the auditing process that never existed in years past. These expectations have added complexity to the audit process. It is no longer adequate to prepare a checklist, perform the audit, and document the results. When viewed as a tool for verifying performance, a quality audit becomes more than a compliance checklist.

Marschman, S.C.

1993-02-01T23:59:59.000Z

211

The pre-audit assessment: A homework assignment for auditors  

SciTech Connect

The role of the quality assurance audit is evolving from compliance verification to a much broader assessment of programmatic and management performance. In the past, audits were poorly understood and caused fear and trepidation. Auditees turned an audit into a cat-and-mouse game using coverup strategies and decoy discrepancies. These games were meant to ``give the auditors what they want, namely a few findings that could later be easily corrected. At Pacific Northwest Laboratory (PNL), I observed auditing become a spectator sport. Matching a compliance-oriented auditor against a crafty group of scientists provided hours of entertainment. As a program manager, it was clear these games were neither productive useful nor cost effective. Fortunately, over the past few years several concepts embraced by ``total quality management` have begun to emerge at PNL. These concepts are being adopted by most successful organizations, and based on these concepts new tools and ideas are emerging to help organizations improve productivity and quality. Successful organizations have been and are continuing to develop management strategies that rely on participative approaches to their operations. These approaches encourage the empowerment of organization staff at all levels, with the goal of instilling ownership of quality in every staff member. As management philosophies are changing, so are the responsibilities and expectations of managers. Managers everywhere are experimenting with new tools to help them improve their operations and competitiveness. As the quality audit evolves, managers and other customers of the audit process have developed expectations for the auditing process that never existed in years past. These expectations have added complexity to the audit process. It is no longer adequate to prepare a checklist, perform the audit, and document the results. When viewed as a tool for verifying performance, a quality audit becomes more than a compliance checklist.

Marschman, S.C.

1993-02-01T23:59:59.000Z

212

S.: Capacity assignment for NAC budgets in resilient networks  

E-Print Network (OSTI)

This paper addresses Quality of Service (QoS) in the presence of network failures. QoS is ensured by Network Admission Control (NAC) mechanisms along virtual tunnels through the network. Their capacity budgets must be set such that the expected traffic can be transported and that unintended overbooking of the physical network capacity is avoided. This paper presents an adaptation for resilient networks, i.e., traffic rerouting is respected in case of local network outages. 1

Michael Menth; Jens Milbr; Stefan Kopf; Michael Menth; Jens Milbr

2004-01-01T23:59:59.000Z

213

An Improved Algorithm for the Generalized Quadratic Assignment ...  

E-Print Network (OSTI)

Electrical and Systems Engineering, University of Pennsylvania ... Operations and Information Management, The Wharton School,. University .... feasible solution generators, Lagrangean relaxation, and subgradient optimization to solve hard.

214

GEOS898 History on the Rocks Assignment 2  

E-Print Network (OSTI)

Goggles and aprons Magnifier Graph paper Ruler Colored pencils Small white marker boards (2x3 ft) (Prepare the remaining pictures and rock samples and continue drawing the column using graph paper, rules and colored pencils. (Additional pictures may be used from textbook and internet sources for added clarity.) (20

Frank, Tracy D.

215

Energy management in wireless healthcare systems using dynamic task assignment.  

E-Print Network (OSTI)

??Wireless healthcare systems are hierarchical and heterogeneous in nature with components that have different energy and performance capabilities. Ensuring the optimal energy consumption across all (more)

Aghera, Priti

2010-01-01T23:59:59.000Z

216

Energy management in wireless healthcare systems using dynamic task assignment  

E-Print Network (OSTI)

can have very different battery capacity, thus leading toand the available battery capacity of the resources. ChapterVariables and Constants Battery capacity of resource r P Rr

Aghera, Priti

2010-01-01T23:59:59.000Z

217

On Solving a Hard Quadratic 3-Dimensional Assignment Problem  

E-Print Network (OSTI)

School of Mathematical and Statistical Sciences, Arizona State University, Tempe , USA. E-mail: ...... Handbook of Constraint Programming, pp. 329376. ... Rehn, T.: Fundamental permutation group algorithms for symmetry computation. Mas-.

218

Fast Simulation of Cellular Networks with Dynamic Channel Assignment  

E-Print Network (OSTI)

been discussed. ESGF (Earth System Grid Federation) is an international collaboration providing access permettant d'accéder et d'utiliser les données de la grille ESGF (Earth Science Grid Federation) depuis la noeuds de travail d'y accéder. L'accès aux données ESGF étant restreint [1] l'utilisateur doit être muni

Vázquez-Abad, Felisa J.

219

Scalable techniques for document identifier assignment in inverted indexes  

Science Conference Proceedings (OSTI)

Web search engines depend on the full-text inverted index data structure. Because the query processing performance is so dependent on the size of the inverted index, a plethora of research has focused on fast end effective techniques for compressing ... Keywords: documentID reassignment, index compression

Shuai Ding; Josh Attenberg; Torsten Suel

2010-04-01T23:59:59.000Z

220

An efficient method to compute traffic assignment problems with ...  

E-Print Network (OSTI)

Demand. Disutility. Function ?(?) h(?). Constant elasticity ?e??? ? ?. [log(? ?. ) ..... in the edited volume: Current trends in transportation and network analysis. 15...

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Memory-Aware Parallelized RLT3 for solving Quadratic Assignment ...  

E-Print Network (OSTI)

Oct 9, 2013 ... Trend lines are drawn for both sets of experiments, in order to extrapolate runtimes for larger problems. For the ... RLT1/2 Log run:me. RLT1/2/3...

222

Probabilistic search optimization and mission assignment for heterogeneous autonomous agents  

Science Conference Proceedings (OSTI)

This paper presents an algorithmic framework for conducting search and identification missions using multiple heterogeneous agents. Dynamic objects of type "neutral" or "target" move through a discretized environment. Probabilistic representation of ...

Timothy H. Chung; Moshe Kress; Johannes O. Royset

2009-05-01T23:59:59.000Z

223

Value Assignment of Light Stable Isotope Reference Materials  

Science Conference Proceedings (OSTI)

... prepared by H. Svec, Iowa State University. ... to relate field measurements to stated references in ... RM 8564 (Biogenic, Modern Biomass Origin) GS ...

2011-08-04T23:59:59.000Z

224

DOE M 321.1-1, Intergovernmental Personnel Act Assignments  

Directives, Delegations, and Requirements

This Manual implements provisions of the Intergovernmental Personnel Act (IPA) within the Department of Energy (DOE) and establishes requirements, ...

2000-08-24T23:59:59.000Z

225

Wavelength Assignment in Multi-Fiber WDM Networks by ...  

E-Print Network (OSTI)

states. In the WA problem, the paths are supplied with a wavelength at each of .... capacity is installed to switch all channels provided by the links incident to it. ... both directions), for formulation purposes the path p is directed from a source ?p...

226

Models and Solution Techniques for Frequency Assignment Problems  

E-Print Network (OSTI)

Jan 16, 2002 ... Abstract: Wireless communication is used in many different situations ... and TV broadcasting, satellite communication, and military operations.

227

AME 514 Applications of Combustion -Spring 2013 Assignment #5: "Due" Friday 5/3/13 but assignments will be accepted  

E-Print Network (OSTI)

on mediatorless microbial fuel cells). M. V. Kök, G. Guner, S. Bagci, Oil Shale, Vol. 25, No. 2, pp. 217­225 (2008). Paper on in situ combustion of oil shale for oil production. Kocha, S. S. Yang, J. D., Yi, J. S. (2006

228

Pressing Back: The Struggle for Control over China's Journalists  

E-Print Network (OSTI)

255-75. Perry Link, "The Anaconda in the Chandelier: ChineseLinks article The Anaconda in the Chandelier provides amakes Perry Links anaconda in the chandelier metaphor so

Hassid, Jonathan

2010-01-01T23:59:59.000Z

229

The Cost of Caution: Tobacco Industry Political Influence and Tobacco Policy Making in Oregon 1997-2007  

E-Print Network (OSTI)

Oregon Restaurant Association. . . . . . . . . . . . . . . .63 The Oregon Restaurant Association Organizes Oppositionon the Task Force: Bill Perry from the Oregon Restaurant

Kristen Lum; Stanton A. Glantz, PhD

2007-01-01T23:59:59.000Z

230

Cornell's Research Serves the Region and Beyond  

E-Print Network (OSTI)

; Gillette, 1997; Perry et al., 1997; Zhang et al., 1997; Prospero, 1999; Zhang and Carmichael, 1999; deReus

Danforth, Bryan Nicholas

231

HETEROGENEOUS NOX CHEMISTRY IN POLLUTED URBAN ATMOSPHERES: IMPLICATIONS FOR THE FORMATION OF PARTICLES AND OZONE AND  

E-Print Network (OSTI)

; Gillette, 1997; Perry et al., 1997; Zhang et al., 1997; Prospero, 1999; Zhang and Carmichael, 1999; deReus

Dabdub, Donald

232

A literature review of safety culture.  

SciTech Connect

Workplace safety has been historically neglected by organizations in order to enhance profitability. Over the past 30 years, safety concerns and attention to safety have increased due to a series of disastrous events occurring across many different industries (e.g., Chernobyl, Upper Big-Branch Mine, Davis-Besse etc.). Many organizations have focused on promoting a healthy safety culture as a way to understand past incidents, and to prevent future disasters. There is an extensive academic literature devoted to safety culture, and the Department of Energy has also published a significant number of documents related to safety culture. The purpose of the current endeavor was to conduct a review of the safety culture literature in order to understand definitions, methodologies, models, and successful interventions for improving safety culture. After reviewing the literature, we observed four emerging themes. First, it was apparent that although safety culture is a valuable construct, it has some inherent weaknesses. For example, there is no common definition of safety culture and no standard way for assessing the construct. Second, it is apparent that researchers know how to measure particular components of safety culture, with specific focus on individual and organizational factors. Such existing methodologies can be leveraged for future assessments. Third, based on the published literature, the relationship between safety culture and performance is tenuous at best. There are few empirical studies that examine the relationship between safety culture and safety performance metrics. Further, most of these studies do not include a description of the implementation of interventions to improve safety culture, or do not measure the effect of these interventions on safety culture or performance. Fourth, safety culture is best viewed as a dynamic, multi-faceted overall system composed of individual, engineered and organizational models. By addressing all three components of safety culture, organizations have a better chance of understanding, evaluating, and making positive changes towards safety within their own organization.

Cole, Kerstan Suzanne; Stevens-Adams, Susan Marie; Wenner, Caren A.

2013-03-01T23:59:59.000Z

233

CSCE4350 SQL Query Assignment Date Issued: 9/20/2012  

E-Print Network (OSTI)

. List all customers 3. Find loan number, branch name, and the loan amount multiplied by 10 of each loan, loan number and loan amount of all customers having a loan at the Downtown branch. 7. Find the names with the query number, e.g Part A.1. Make sure your file runs before submitting it because the TA will check

Huang, Yan

234

A Dynamic Programming Approach to Adaptive Tatum Assignment for Rhythm Transcription  

Science Conference Proceedings (OSTI)

We present a method for segmenting music with different grid levels in order to properly quantize note values in the transcription of music. This method can be used in automatic music transcription systems and music information retrieval systems to reduce ...

Aaron C. Yang; Elaine Chew; Anja Volk

2005-12-01T23:59:59.000Z

235

Policy Flash 2013-76 Term Assignments of Contractors to the DC Area  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to A Scott Geary of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

236

MAE 124/ESYS 103: The Human Earth Assignment for Paper #1 (2006)  

E-Print Network (OSTI)

products, natural gas, nuclear and hydroelectric generation; and (2) technology exists to achieve Administrator for Administration and Resources Management, has asked you to draft some new potential regulation substantial efficiencies in domestic consumption of energy resources, (3) regulation regarding

Gille, Sarah T.

237

Assisted students, graded exams and assignment for Circuits and Wavelets and Filter Banks courses.  

E-Print Network (OSTI)

Conducting research in computer vision and computer graphics focused on 3-D reconstruction, facial motion synthesis, and automatic face replacement. JOHNS HOPKINS UNIVERSITY 2000 2006 Graduate Research Assistant (Adviser: Michael I. Miller) Designed and implemented novel algorithms for face pose, illumination, and expression tracking in video. Developed methods for medical image analysis. Worked on and analyzed algorithms for automated target detection and recognition.

Dmitri Bitouk; Adviser Michael; I. Miller

2003-01-01T23:59:59.000Z

238

ORS Contracts & Grants Specialist Assignments 1 Effective 08/01/2013  

E-Print Network (OSTI)

/Kathy Yoshinaga IfA, excluding Maui SOEST Admin C-MORE HIGP HNEI HSFL HSGC Ocean Resources Eng Sea Grant Ryan Yeh/Naomi Chow SOEST Geology & Geophysics HIMB HURL IPRC JIMAR Meteorology Oceanography Vessel Charters Ryan Yeh Ctr Water Resources Research Ctr Cheryl Reeser UH Maui College IfA, Maui only ITS CC - Kauai, Hawaii

239

Operating Range Comments Details on page 149 Curve of constant assigned power rating  

E-Print Network (OSTI)

Flat motor ?6 mm, brushless, 0.03 Watt Axial preload > 0.03 N defined through magnetic force between. permissible winding temperature +100°C Weight of motor 0.35 g 8 pole permanent magnet 3 phased coil stator term operation The motor may be briefly overloaded (recurring). Motor with high resistance winding

Ida, Nathan

240

Phylogenetic Relationships within Heliodinidae and Systematics of Moths Formerly Assigned to Heliodines Stainton (Lepidoptera: Yponomeutoidea)  

E-Print Network (OSTI)

Type species: Epicroesa ambrosia Meyrick; by originalEpicroesa Meyrick, 1907 ambrosia Meyrick, 1907 calliteucha

Hsu, Yu-Feng; Powell, Jerry A.

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

ENVIR 202b Earth, Air Water Winter 2003 Essay 1: assigned: Tues 1/14/03  

E-Print Network (OSTI)

, Tim Grabowski2 , Jason Babcock2 , and Shih-Fu Chang1 1 Dept. of Electrical Engineering, Columbia Apprentice, a system in which image classifiers are learned (using machine learning) from user input of automatic classifiers in a framework like the Visual Apprentice [10]. In that system, image classifiers

242

Student Milestones Page This page is used to assign milestones to students.  

E-Print Network (OSTI)

­ Enroll Students ­ Student Milestones ­ Student Milestones Search Fields Effective Date The effective/evaluator to the student milestone. Available when the Advised by Committee checkbox is not selected. Comment Enter advisor or committee related comments in this field. Page Fields ­ Completion Information Frame Term

Jones, Michelle

243

Ravel-XL: a hardware accelerator for assigned delay compiled-code logic gate simulation  

Science Conference Proceedings (OSTI)

Keywords: design verification, digital logic simulation, hardware accelerators, levelized compiled code, simulation engines, special purpose architectures, timing analysis

Michael A. Riepe; Joo P. Marques Silva; Karem A. Sakallah; Richard B. Brown

1996-03-01T23:59:59.000Z

244

Fuzzy-probabilistic multi agent system for breast cancer risk assessment and insurance premium assignment  

Science Conference Proceedings (OSTI)

In this paper, we present an agent-based system for distributed risk assessment of breast cancer development employing fuzzy and probabilistic computing. The proposed fuzzy multi agent system consists of multiple fuzzy agents that benefit from fuzzy ... Keywords: Breast cancer, Fuzzy probability, Fuzzy-probabilistic multi agent system, Insurance premium, Uncertainty

Farzaneh Tatari; Mohammad-R. Akbarzadeh-T; Ahmad Sabahi

2012-12-01T23:59:59.000Z

245

Integrated Power-Gating and State Assignment for Low Power FSM Synthesis  

Science Conference Proceedings (OSTI)

Power-gating is an effective technique for reducing standby leakage power and dynamic power. In power-gating one can shut off the power supply to sections of logic block while keeping other logic blocks active. However, careful design is required to ... Keywords: Low power synthesis, Power-gating, FSM decomposition, State encoding, Genetic Algorithm

Sambhu Nath Pradhan; M. Tilak Kumar; Santanu Chattopadhyay

2008-04-01T23:59:59.000Z

246

A dual-band priority assignment algorithm for dynamic QoS resource management  

Science Conference Proceedings (OSTI)

Future high-quality consumer electronics will contain a number of applications running in a highly dynamic environment, and their execution will need to be efficiently arbitrated by the underlying platform software. The multimedia applications that currently ... Keywords: Consumer electronics, Embedded systems, Multimedia, Quality of service (QoS), Real-time, Resource management

Marisol Garca Valls; Alejandro Alonso; Juan Antonio de la Puente

2012-06-01T23:59:59.000Z

247

DOE O 142.3A, Unclassified Foreign Visits and Assignments Program  

Directives, Delegations, and Requirements

The order defines a program for unclassified foreign national access to DOE sites, information, technologies, and equipment. Cancels DOE O 142.3.

2010-10-14T23:59:59.000Z

248

Faculty Mentor Assignments for Aerospace Engineering Students Last Name First Name Mentor Mentor Email  

E-Print Network (OSTI)

mkrstic@ucsd.edu Hernandez Jason Allan Abedania Juan Lasheras jlasheras@ucsd.edu Hernandez Mary Azucena Raymond De Callafon callafon@ucsd.edu Hernandez-Ibarra David Robert Bitmead rbitmead@ucsd.edu Hinden Name Mentor Mentor Email Malcolm Dustin Lee Hidenori Murakami hmurakami@ucsd.edu Malta Ramon Keiko

Krstic, Miroslav

249

Through-bond Correlation Methods for Assigning Protein Resonances with Solid-State NMR Spectroscopy  

E-Print Network (OSTI)

edscon PHASPR 1 to 1.7 usec ;DQF chemical shift correlationd0 : incremented delay (2D) [3 usec] ;l3 : loop for phaseedscon PHASPR 1 to 1.7 usec ;DQF chemical shift correlation

Chen, Lingling

2008-01-01T23:59:59.000Z

250

Calibration Model Assignments expressed as U3O8, Summary Table...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Natural Gas Imports and Exports - Second Quarter Report 2013 Response to several FOIA requests -...

251

Potential airport capacity gains from the optimal assignment of aircraft types to runways  

E-Print Network (OSTI)

Large commercial airports worldwide still experience demand in excess of capacity which leads to considerable delays. As an operational solution to alleviate delays, this thesis presents a model that aims at increasing ...

Kohler, Alf, 1962-

2004-01-01T23:59:59.000Z

252

Effects of truckload freight assignment methods on carrier capacity and pricing  

E-Print Network (OSTI)

The analysis is based on one year of transactional data from a major beverage company and interviews with asset based and non-asset based truckload carriers. Throughout our research we investigate the use of asset based ...

Kafarski, Lukasz

2012-01-01T23:59:59.000Z

253

Phylogenetic Relationships within Heliodinidae and Systematics of Moths Formerly Assigned to Heliodines Stainton (Lepidoptera: Yponomeutoidea)  

E-Print Network (OSTI)

A new elachistid moth from Manitoba. Can. Entomol. 46: 423-Holotype: : CANADA: MANITOBA: Aweme, bred from OxybaphusEXAMINED: CANADA: MANITOBA: 3 , 1 , Aweme, 9.VII.1913 (N.

Hsu, Yu-Feng; Powell, Jerry A.

2004-01-01T23:59:59.000Z

254

Stabilized Branch-and-cut-and-price for the Generalized Assignment ...  

E-Print Network (OSTI)

price for that problem featuring a stabilization mechanism to accelerate ... and- price by Savelsbergh [11] and the branch-and-cut by Farias and Nemhauser. [2].

255

Workshops to rate and assign air and water issues for hydrothermal energy development  

DOE Green Energy (OSTI)

The presentations, discussions, and recommendations associated with a semiformal, 2-day workshop organized and hosted by Los Alamos Scientific Laboratory personnel at Los Alamos, NM, for March, 11-12, 1980, and an informal, 2-day workshop hosted by Lawrence Livermore Laboratory at Livermore and Konocti Harbor, CA, from April 15-16, 1980 are described briefly. These workshops were not conducted to determine what the problems are, but rather to determine which ones should be addressed and who should address them. Brief reviews of issues identified by previous workshops and studies are included as background.

Williams, J.M.; Wewerka, E.M.

1980-12-01T23:59:59.000Z

256

A scaling theory for the assignment of spectra in the irregular region. Continuation progress report  

SciTech Connect

The ultimate object of our program is to learn how to extract information about molecular rovibrational motions from experimental spectra or calculated energy levels. This goal of spectroscopy and theoretical chemistry has historically only been possible in the regular spectral region. Our project is one of several which are aimed at spectral interpretation in the chaotic or mixed chaotic plus regular regions. Our particular tools involve a scaling theory developed under our previous DOE support period. This theory uses experimentally fitted spectral Hamiltonians or Hamiltonian`s whose potentials are calculated using quantum chemistry, to obtain energy levels as a function of h{sup -1}. The scaling theory then uses this input to highlight the actions of the subset of all periodic orbits which control the dynamics at any given energy up to dissociation. The periodic orbits themselves, are the skeleton of classical phase space for the molecular motions and are found by classical non-linear dynamic techniques. The finding and following of these periodic orbits by constructing a bifurcation diagram, and in 2D, Poincare surfaces of section, is labor intensive and takes much of our available man hours. We have two projects, {open_quotes}acetylene{close_quotes} and {open_quotes}NO{sub 2}.{close_quotes} Below we first briefly sketch the results of the classical phase space study using the fitted spectral Hamiltonian that describes pure bending dynamics of in the acetylene X{sup 1}{Sigma}{sub g}{sup +} state to 15,000 cm{sup -1} of internal energy. The work on NO{sub 2} will follow. The specific purpose of this part of our work is to establish relations between experimental data and quantum mechanical results on one side and the behaviour of the dynamics given by the corresponding classical Hamiltonian function on the other side for the bend vibrations of the C{sub 2}H{sub 2} molecule. We transform it into a classical Hamiltonian function given in action and angle variables.

Taylor, H.S.

1998-06-01T23:59:59.000Z

257

Contact Us - U.S. Energy Information Administration (EIA) - U.S. Energy  

Gasoline and Diesel Fuel Update (EIA)

Environmental Experts Environmental Experts Fax: 202-586-3045 Biodiesel/Ethanol Anthony Radich 202-586-0504 anthony.radich@eia.gov Carbon Dioxide - U.S. Projections (STEO and AEO) Perry Lindstrom 202-586-0934 perry.lindstrom@eia.gov Electric Power Emissions Kevin Lillis 202-586- 3704 kevin.lillis@eia.gov Electric Power Sector Pollutant Emissions - Modeling and Projections Robert Smith 202-586-9413 robert.smith@eia.gov Greenhouse Gases - Modeling and Analysis Yanna Antypas 202-586-1420 yanna.antypas@eia.gov Greenhouse Gases and International Carbon Dioxide Emissions Perry Lindstrom 202-586-0934 perry.lindstrom@eia.gov International Carbon Dioxide Emissions - Current Data Karen Griffin 202-586-1537 karen.griffin@eia.gov Perry Lindstrom 202-586-0934 perry.lindstrom@eia.gov

258

Press Release: DOE Seeks Public Input for Depleted Uranium Hexafluorid...  

NLE Websites -- All DOE Office Websites (Extended Search)

Perry, (865) 576-0885 September 24, 2001 www.oakridge.doe.gov DOE SEEKS PUBLIC INPUT FOR DEPLETED URANIUM HEXAFLUORIDE ENVIRONMENTAL IMPACT STATEMENT Public Meetings Planned in...

259

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 SEAB members heard opening remarks from Chairman Perry and Secretary Chu. Secretary Chu gave...

260

Small Modular Reactor Report (SEAB) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Modular Reactor Report (SEAB) Small Modular Reactor Report (SEAB) In his April 3, 2012, Memorandum to Secretary of Energy Advisory Board (SEAB) Chairman William Perry,...

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Summary Minutes of the Secretary of Energy Advisory Board Public...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 SEAB members heard opening remarks from Chairman Perry and Secretary Chu. Secretary Chu gave...

262

Small Modular Reactor Report (SEAB)  

Energy.gov (U.S. Department of Energy (DOE))

In his April 3, 2012, Memorandum to Secretary of Energy Advisory Board (SEAB) Chairman William Perry, Secretary of Energy Steven Chu charged:

263

Administrative Staff - Argonne National Laboratories, Materials...  

NLE Websites -- All DOE Office Websites (Extended Search)

M. Gruen Operations Manager Richard Vitt Environment, Safety & Health; Quality Assurance Urs Geiser, ESH Coordinator and QA Representative Perry Plotkin, ESH Resource Staff...

264

Division Personnel - Argonne National Laboratories, Materials...  

NLE Websites -- All DOE Office Websites (Extended Search)

W. Crabtree Janice M. Coble Julie Emery Kenneth J Krajniak Lacey Bersano Matthew Leece Michael Norman Noreen Sorensen Perry Plotkin Richard Vitt Timothy Kendall Urs W. Geiser...

265

Research Park Notes, Issue 18  

NLE Websites -- All DOE Office Websites (Extended Search)

Maryland); Brittany Burtner (Keedysville, Maryland); Paul Swingle (Mt. Perry, Ohio); Eileen Rogers (Toronto, Ohio); and Jameela Johnson (Landrum, South Carolina). Climate Change...

266

Fuel-Cell Fundamentals at Low and Subzero Temperatures  

NLE Websites -- All DOE Office Websites (Extended Search)

Cell Fundamentals at Low and Subzero Temperatures Adam Z. Weber (PI), John Newman, Clayton Radke LBNL Rangachary Mukundan, Rodney Borup LANL Michael Perry UTRC Mark Debe 3M...

267

Improved Tools for Drought Planning Final Report  

E-Print Network (OSTI)

Dr. Perry Miller, Co-Investigator, High Performance Computing Joseph Adams, Decision Theater Adam Kubach, High Performance Computing Jeffrey Conner, High Performance Computing Arizona State University Dr

Cushing, Jim. M.

268

Office of Human Resources Management Staff Listing  

Science Conference Proceedings (OSTI)

... Perry, Brenda, 301-975-3031. Porch, Susanne, 301-975-2487. Price, Arona, 301-975-3032. Reeves, Crystal, 301-975-3045. ...

2013-10-28T23:59:59.000Z

269

Marine Fisheries On the cover: Gambierdiscus toxicus  

E-Print Network (OSTI)

. Durst, and T. B. Higerd 57 Myles Raizin and Lloyd Regier 60 Perry W. Pawlyk and Kenneth J. Roberts 65 71

270

22nd NREL Industry Growth Forum Opening Remarks - Day 2 (Presentation)  

SciTech Connect

A presentation at the 22nd Industry Growth Forum by Tod Perry that provides information and statistics about the presenting companies.

Perry, T.

2009-11-04T23:59:59.000Z

271

RECENT DEVELOPMENTS OF THE IRIS PROJECT OF INTEREST FOR LATIN AMERICA  

Science Conference Proceedings (OSTI)

The IRIS (International Reactor Innovative and Secure) reactor design is being developed by an international consortium of 21 organizations from ten countries, including three members from Brazil and one from Mexico. This reflects the interest that Latin America has for a project which addresses the energy needs of the region. Presented here are some of the most recent developments in the IRIS project. The project's highest priority is the current pre-application licensing with the US NRC, which has required an investigation of the major accident sequences and a preliminary probabilistic risk assessment (PRA). The results of the accident analyses confirmed the outstanding inherent safety of the IRIS configuration and the PRA analyses indicated a core damage frequency due to internal events of the order of 2E-8. This not only highlights the enhanced safety characteristic of IRIS which should enhance its public acceptance, but it has also prompted IRIS to consider the possibility of being licensed without the need for off-site emergency response planning which would have a very positive economic implication. The modular IRIS, with each module rated at {approx} 335 MWe, is of course an ideal size for developing countries as it allows to easily introduce a moderate amount of power on limited electric grids. IRIS can be deployed in single modules in regions only requiring a few hundred MWs or in multiple modules deployed successively at time intervals in large urban areas requiring a larger amount of power increasing with time. IRIS is designed to operate ''hands-off'' as much as possible, with a small crew, having in mind deployment in areas with limited infrastructure. Thus IRIS has a 48-months maintenance interval, long refueling cycles in excess of three years, and is designed to increase as much as possible operational reliability. For example, the project has recently adopted internal control rod drive mechanisms to eliminate vessel head penetrations and the possibility of corrosion cracking as in Davis-Besse and other plants. Latin America, as many other regions on the earth, needs water as much as electricity. IRIS has developed a water desalination co-generation design which can employ a variety of processes as dictated by local and economic conditions. Applications to the arid Brazilian Nord-Este and Mexican Nord-Oeste are being considered.

Carelli, M.D.; Petrovic, B.

2004-10-03T23:59:59.000Z

272

Engineering Reliability into Web Sites: Google SRE  

E-Print Network (OSTI)

Engineering Reliability into Web Sites: Google SRE Alex Perry alex.perry@google.com Santa Monica SRE, Google #12;Abstract This talk introduces Site Reliability Engineering (SRE) at Google, explaining, Santa Monica, Dublin and Kirkland manage Google's many services and websites. They draw upon the Linux

Cortes, Corinna

273

Right/left assignment in drift chambers and proportional multiwire chambers (PWC's) using induced signals  

DOE Patents (OSTI)

Improved multiwire chamber having means for resolving the left/right ambiguity in the location of an ionizing event. The chamber includes a plurality of spaced parallel anode wires positioned between spaced planar cathodes. Associated with each of the anode wires are a pair of localizing wires, one positioned on either side of the anode wire. The localizing wires are connected to a differential amplifier whose output polarity is determined by whether the ionizing event occurs to the right or left of the anode wire.

Walenta, Albert H. (Upton, NY)

1979-01-01T23:59:59.000Z

274

Parameter assignment for improved connectivity and security in randomly deployed wireless sensor networks via hybrid omni/uni-directional antennas  

E-Print Network (OSTI)

Conguring a network system to operate at optimal levels of performance re-quires a comprehensive understanding of the eects of a variety of system parameterson crucial metrics like connectivity and resilience to network attacks. Traditionally,omni-directional antennas have been used for communication in wireless sensor net-works. In this thesis, a hybrid communication model is presented where-in, nodes ina network are capable of both omni-directional and uni-directional communication.The eect of such a model on performance in randomly deployed wireless sensor net-works is studied, specically looking at the eect of a variety of network parameterson network performance.The work in this thesis demonstrates that, when the hybrid communication modelis employed, the probability of 100% connectivity improves by almost 90% and thatof k-connectivity improves by almost 80% even at low node densities when comparedto the traditional omni-directional model. In terms of network security, it was foundthat the hybrid approach improves network resilience to the collision attack by almost85% and the cost of launching a successful network partition attack was increased byas high as 600%. The gains in connectivity and resilience were found to improve withincreasing node densities and decreasing antenna beamwidths.

Shankar, Sonu

2008-08-01T23:59:59.000Z

275

Fast mode assignment for quality scalable extension of the high efficiency video coding (HEVC) standard: a Bayesian approach  

Science Conference Proceedings (OSTI)

The new compression standard, known as the High Efficiency Video Coding (HEVC), aims at significantly improving the compression efficiency compared to previous standards. There has been significant interest in developing a scalable version of this standard. ... Keywords: low complexity compression, machine learning, scalable HEVC, video compression

H. R. Tohidypour, H. Bashashati, M. T. Pourazad, P. Nasiopoulos

2013-09-01T23:59:59.000Z

276

1H, 15N, and 13C chemical shift assignments of neuronal calcium sensor-1 homolog from fission yeast  

E-Print Network (OSTI)

Keywords NCS Ncs1p Fission yeast Calcium EF-hand Takeda K, Ames JB (2004) Fission yeast homolog of neuronal

Lim, Sunghyuk; Ames, James B.

2009-01-01T23:59:59.000Z

277

Journal Article Reviews The purpose of these assignments is to familiarize you with refereed journals devoted to  

E-Print Network (OSTI)

think? Don't just say you whether you liked it or not ­ tell me why, in your informed opinion, you think. 3rd Journal article review ­ Wilderness Recreation Use; Choose ONE: Farrell, T., Hall, T. E. & White are important. Avoid sentence fragments by writing in complete sentences. Edit your paper for readability

Brown, Gregory G.

278

ASSIGNMENT OF 5069 A DIFFUSE INTERSTELLAR BAND TO HC{sub 4}H{sup +}: DISAGREEMENT WITH LABORATORY ABSORPTION BAND  

SciTech Connect

Krelowski et al. have reported a weak, diffuse interstellar band (DIB) at 5069 A which appears to match in both mid-wavelength and width the A {sup 2}{Pi}{sub u}-X {sup 2}{Pi}{sub g} gas-phase origin absorption band of HC{sub 4}H{sup +}. Here, we present laboratory rotational profiles at low temperatures which are then compared with the 5069 A DIB using {approx}0.1 and 0.3 A line widths based on a realistic line-of-sight interstellar velocity dispersion. Neither the band shape nor the wavelength of the maximum absorption match, which makes the association of the 5069 A DIB with HC{sub 4}H{sup +} unlikely. The magnetic dipole transition X {sup 2}{Pi}{sub g} {Omega} = 1/2{yields}X {sup 2}{Pi}{sub g} {Omega} = 3/2 within the ground electronic state which competes with collisional excitation is also considered. In addition, we present the laboratory gas-phase spectrum of the A {sup 2}{Pi}{sub u}-X {sup 2}{Pi}{sub g} transition of HC{sub 4}H{sup +} measured at 25 K in an ion trap and identify further absorption bands at shorter wavelengths for comparison with future DIB data.

Maier, J. P.; Chakrabarty, S.; Mazzotti, F. J.; Rice, C. A.; Dietsche, R. [Department of Chemistry, University of Basel, Klingelbergstr. 80, CH-4056 Basel (Switzerland); Walker, G. A. H. [1234 Hewlett Place, Victoria, BC V8S 4P7 (Canada); Bohlender, D. A., E-mail: j.p.maier@unibas.ch [National Research Council of Canada, Herzberg Institute of Astrophysics, 5071 West Saanich Road, Victoria, BC V9E 2E7 (Canada)

2011-03-10T23:59:59.000Z

279

Lesson 2: Variables, Assignment and Equations Maple has extensive graphics capabilities. Here's a graph of a function.  

E-Print Network (OSTI)

an extensive help system. To get help on a particular command, you can enter a question mark followed by the name of the command: #12;?int Or you can use the Table of Contents, or Topic Search or Text Search from over 500 billion terms. It's very unlikely that your computer has a memory big enough to store that

Israel, Robert

280

9/13/06 1/1 GEOL474/674 Fall 2006 Assignment #2 Due: 9/21/05  

E-Print Network (OSTI)

on engineering paper (the green stuff) or clean white paper. Please cite references where appropriate, show your, downstream head = 10 cm 4) Over a 40 hour period, 12.3 gallons of water are added to a standard land pan (47

Ahmad, Sajjad

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

ASSIGNMENT #6. Due Tuesday 10/26/04 1. Wallace and Hobbs problem 3.1 (k-o)  

E-Print Network (OSTI)

and a closed, 3D triangle mesh representation is constructed. We apply the system to architectural daylighting daylighting design system can be used by novice or experienced designers who need not be experts in day #12;OVERVIEW Our virtual heliodon system complements modern desktop architectural daylighting design

Sherwood, Steven

282

ASSIGNMENT, WEEK 6. Due 10/29/02 1. Wallace and Hobbs problem 3.1 (k-o)  

E-Print Network (OSTI)

of Environmental Design, and a pioneer in passive solar, daylighting and sustainable-design research and teaching. He has published seminal articles on the design potential of sustainable systems and urban-design principles for transit-oriented neighborhoods. An award-winning architect, Fraker is pursuing a whole-systems

Sherwood, Steven

283

ETTA-IM: A deep web query interface matching approach based on evidence theory and task assignment  

Science Conference Proceedings (OSTI)

Integrating Deep Web data sources require highly accurate matches between the attributes of the query interfaces. While interface matching has received more attentions recently, current approaches are still not sufficiently perfect: (a) they all suppose ... Keywords: Deep Web, Query interface matching, Schema matching, Web data integration

Yongquan Dong; Qingzhong Li; Yanhui Ding; Zhaohui Peng

2011-08-01T23:59:59.000Z

284

Department of Energy Business Opportunity Session  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alan Perry Alan Perry Title: Administrative Officer Office: Office of the Chief Human Capital Officer E-Mail: Alan.Perry@hq.doe.gov Phone: 202-586-4484 Website: http://humancapital.doe.gov/ Office of the Chief Human Capital Officer Department of Energy's Business Opportunity Session OCHCO Overview OCHCO supports DOE Program and Staff Offices at Headquarters & Field Main Services Offered * Human Capital and Human Resource Guidance * Human Capital Strategic Planning * Policy Development * Corporate HR Information Systems * Workforce Training & Development * Human Resource Operations * Employee Management Labor Relations * Recruitment and Outreach * Executive Resources * Business Support * Drug-Testing Program * Employee Assistance Program * Occupational Health Services * Disability Services

285

Secretary of Energy Advisory Board  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 January 20, 2011 Agenda Open Plenary Meeting Session 9:00 AM-9:30 AM Welcome and Overview Dr. William Perry...

286

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chairman Perry thanked the Secretary for his leadership and dedication to the Advisory Board. He noted the current Presidential term is coming to an end and with a new term,...

287

Secretary of Energy Advisory Board DOE Headquarters Washington...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

William Perry 8:30 AM-9:30 AM Key Issues for DOE Secretary Steven Chu 9:30 AM-10:30 AM Small Modular Reactor Presentation Vic Reis, DOE Office of Science John Kelly, DOE Office of...

288

Research alert - Dealing with mobility  

E-Print Network (OSTI)

Perry,M. O'Hara,K. Sellen,A. Harper,R. Brown,B. Interactions, November/December 2001, ACM Press, 9-11 pp 9-11 ACM Press

Perry, M.; O'Hara, K.; Sellen, A.; Harper, R.; Brown, B.; Interactions, November/December 2001, ACM Press, 9-11 pp 9-11 ACM Press [More Details

289

w. T. Thorntot-l, OR RADIOLOGICAL STATUS OF FORMER VIRGINIA-CAROLINA...  

Office of Legacy Management (LM)

()r' 2J ;3:7 . - w. T. Thorntot-l, OR RADIOLOGICAL STATUS OF FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION SITE AT.818 PERRY STREET, RICHFIOND, VIRGINIA Your memorandum report of...

290

THE TOBACCO INDUSTRY DOCUMENTS: What they are, what they tell us, and how to search them. A practical manual  

E-Print Network (OSTI)

control of the tobacco industrys external research program.the door to the tobacco industrys secrets about nicotine.Perry CL. The tobacco industry and underage youth smoking:

2004-01-01T23:59:59.000Z

291

Grain Core Dielectric Constants of Acceptor-doped Oxide Electrolytes  

Science Conference Proceedings (OSTI)

Author(s), Nicola H. Perry, Ted C. Yeh, Thomas O. Mason. On-Site Speaker ... Water Uptake and Conduction Property of Nano-grained Fluorite-type Oxides.

292

Design and construction of a hydrostatic dynamometer for testing a hydraulic hybrid vehicle.  

E-Print Network (OSTI)

??University of Minnesota M.S. thesis. July 2012. Major: Mechanical engineering. Advisors:Perry Y. Li, Thomas R. Chase. 1 computer file (PDF); vii, 98 pages, appendices A-F. (more)

Kohring, Henry Julian

2012-01-01T23:59:59.000Z

293

REGULATION AND SYSTEM INTERDEPENDENCE: EFFECTS ON THE SITING OF CALIFORNIA ELECTRICAL ENERGY FACILITIES  

E-Print Network (OSTI)

calculated by a special PJM algorithm based on the MAJORYork State Power Pool (1966) 4. PJM Pennsylvania-New Jersey-familiar with NEPEX and PJM. Kaprielian Interview. Perry, p.

Kooser, J.C.

2013-01-01T23:59:59.000Z

294

Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

BibTex RIS RTF XML Sort by: Author Title Type Year (Desc) Filters: Keyword is smart grid Clear All Filters 2013 Cappers, Peter, Annika Todd, Michael Perry, Bernard...

295

Water Challenges for Geologic Carbon Capture and Sequestration  

E-Print Network (OSTI)

and production, natural gas storage, acid gas disposal,mitigation from the natural gas storage and oil industries.of leaks occurring in natural gas storage ?elds (Perry 2003;

Newmark, Robin L.; Friedmann, Samuel J.; Carroll, Susan A.

2010-01-01T23:59:59.000Z

296

Technology and the use of documents in mobile work  

E-Print Network (OSTI)

Perry,M. OHara,K. Sellen,A. Brown,B. Van Oostendorp et al (eds.) Creation, use and deployment of digital information. Lawrence Erlbaum Associates. Academic Press

Perry, M.; OHara, K.; Sellen, A.; Brown, B.; Van Oostendorp et al (eds.) Creation, use and deployment of digital information.; Lawrence Erlbaum Associates.; Academic Press [More Details

297

Microsoft PowerPoint - 13-02 Monts.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

tankAt-tank Characterization for Closure of Hanford Tanks Ping-Rey Jang, Zhiling Long, O. Perry Norton, Walter P. Okhuysen, and David L. Monts Institute for Clean Energy...

298

Secretary of Energy Advisory Board- July 20, 2011 Meeting Minutes  

Energy.gov (U.S. Department of Energy (DOE))

SEAB members heard opening remarks from Chairman Perry and Secretary Chu. The first session was a presentation on small modular reactors from the Office of Science and the Office of Nuclear Energy....

299

Practice test for exam ff1 in MA135 In addition to problems on this sheet, students should study webwork problems, assigned  

E-Print Network (OSTI)

,t ' a- " -3L #12;2 9. A manufacturer of light bulbs estimates that the fraction F(t) of b as many bulbs are burning after 5 weeks as after 9 weeks. a. Find k and determine the fraction of bulbs still burning after 7 weeks. L= \\lnZ ,b. What fraction of the bulbs burn out before 10 weeks? t - * $i

Ferry, Steve

300

Practice test for exam #1 in MA135 In addition to problems on this sheet, students should study webwork problems, assigned  

E-Print Network (OSTI)

. #12;2 9. A manufacturer of light bulbs estimates that the fraction F(t) of bulbs that remain burning after t weeks is given by F(t) = e-kt where k is a positive constant. Suppose twice as many bulbs are burning after 5 weeks as after 9 weeks. a. Find k and determine the fraction of bulbs still burning after

Ferry, Steve

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A new optimum-word-length-assignment (OWLA) multiplierless integer DCT for lossless/lossy image coding and its performance evaluation  

Science Conference Proceedings (OSTI)

Recently, we proposed a multiplierless 1D Int-DCT improved from our previous proposed Int-DCT by approximating floating multiplications to bit-shift and addition operations. The multiplierless 1D Int-DCT can be well operated both lossless coding and ...

Somchart Chokchaitam; Masahiro Iwahashi

2007-08-01T23:59:59.000Z

302

The Effect of the Arbitrary Level Assignment of Satellite Cloud Motion Wind Vectors on Wind Analyses in the Pre-thunderstorm Environment  

Science Conference Proceedings (OSTI)

The impact of satellite-derived cloud motion vectors (CMVs) on analysts of winds measured by rawinsondes during the 1979 SESAME Experiment is studied in two case studies (10 April and 9 May 1979). Cloud motion vectors are both arbitrarily ...

Cynthia A. Peslen; Steven E. Koch; Louis W. Uccellini

1986-05-01T23:59:59.000Z

303

SSRL Division Internal Work Authorization Work at SSRL is assigned on a distributed basis from the division director down through the  

E-Print Network (OSTI)

Revised 1/25/2011 SSRL/LCLS User Shipping Request Form (Hazardous Material) Will this be shipped: ____________________ Method of payment: [ ] Pre-paid [ ] Carrier account: _______________________________ [ ] SSRL/LCLS User Declaration Information below, contact SSRL Safety Officer, Matt Padilla, Bldg. 120/rm. 200 (ext. 3861

Wechsler, Risa H.

304

CSI 5166 ASSIGNMENT 1 Fall 2013 Due: Monday, September 30, 2013, by 6:00pm. You can also drop it off before  

E-Print Network (OSTI)

problem can be modelled as the most-reliable spanning tree problem (MRS tree): Given a weighted graph G a to b can be different than the cost to go from b to a. Consider this problem modeled on a complete directly cycle that visits all of the nodes. Write an ILP to model this problem. 3. [11 marks] Let G

Boyd, Sylvia

305

The reliability of assigning individuals to cognitive states using the Mini Mental-State Examination: a population-based prospective cohort study.  

E-Print Network (OSTI)

; baseline interviews took place between 1989 and 1993. In this study data were used from the five centres with a standardised design: Cambridgeshire, Gwynedd, New- castle, Nottingham, and Oxford (total n = 13,004). The population under investigation... of the manuscript and revised and edited the manuscript. REM is guarantor of the analysis. MC contributed to design and revised and edited the manuscript. FEM contributed to design, advised on the analytical strategy, data acquisition, assisted obtaining funding...

Marioni, Riccardo E; Chatfield, Mark; Brayne, Carol; Matthews, Fiona E; Ageing Study, Medical Research Council Cognitive Function and

2011-09-06T23:59:59.000Z

306

Journal of Energy & Environmental Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Bubenik-Battelle Memorial Bubenik-Battelle Memorial Institute Charles Byrer and Perry Bergman-U.S. Department of Energy, National Energy Technology Laboratory 23 Interaction of Rock Minerals with Carbon Dioxide and Brine: A Hydrothermal Investigation Bruce M. Sass, Neeraj Gupta, and Jennifer A. Ickes-Battelle Memorial Institute Mark H. Engelhard and Donald R. Baer-U.S. Department of Energy, Pacific Northwest National Laboratory Perry Bergman and Charles Byrer-U.S. Department of Energy, National Energy Technology Laboratory 32 Issues Related to Seismic Activity Induced by the Injection of CO 2 in Deep Saline Aquifer Joel Sminchak and Neeraj Gupta-Battelle Memorial Institute Charles Byrer and Perry Bergman-U.S. Department of Energy, National Energy Technology Laboratory 47 A Perspective on the Potential Role of Geologic Options in a National Carbon Management

307

Data:F5dd5c1f-c257-4569-b19d-4a6437faf496 | Open Energy Information  

Open Energy Info (EERE)

dd5c1f-c257-4569-b19d-4a6437faf496 dd5c1f-c257-4569-b19d-4a6437faf496 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Perry Municipal Airport Sector: Commercial Description: Effective with the institution of electric service at the Perry Municipal Airport. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

308

F I S C A L Y E A R 2 0 1 1 A N N U A L R E P O R T E n g i n E E r i n g T o m o r r o w ' s P o u l T r y i n d u s T r y  

E-Print Network (OSTI)

Farms JonathanGreen Pilgrim'sPride KenLong Pilgrim'sPride KenSuber Pilgrim'sPride PerryHauser Sanderson-JacPoultry Pilgrim'sPride Noise Abatement for Vibratory Conveyors Keystone Foods Worker Safety Research for the Poultry Industry PerdueFarms Chicken Egg Fertility Detection AuburnUniversity Pilgrim'sPride Sensing

Löffler, Frank E.

309

Protein and Co-Products Division List  

Science Conference Proceedings (OSTI)

Name AffiliationCity, State, CountryProcessing Division2013 Members276 Members as of January 1, 2013Abrams, JimCargill Corn Milling NAMemphis, TN, USAAhuja, RameshChemPro Technovation Pvt LtdAhmedabad, Gujarat, IndiaAlasti, PerryArtisan Industries IncWalth

310

Securing our energy future? A review of Nova Scotia's energy sector in 2004  

E-Print Network (OSTI)

terminals in the Maritimes that would produce, using imported LNG, natural gas for export to the US using. Recently the residents of Perry, Maine, voted against the construction of an LNG terminal (Herald, 2005a). Given the reluctance of communities in the US to accept LNG terminals, and the availability of a natural

Hughes, Larry

311

Chalk it up to clever advertising The chalked sign in front of Mr. Bartley's  

E-Print Network (OSTI)

. Many stu- dents came to Radcliffe afterward because of Helen Keller." From the Harvard Historical residences, and other locations around the University. U.S. delivery (periodical mail) of 32 issues per year- munications Director Perry Hewitt, on an updated platform that will enable us to present more multimedia

Manapat, Michael

312

Texas Transportation Needs Summary About the 2030 Committee  

E-Print Network (OSTI)

Texas Transportation Needs Summary About the 2030 Committee In May 2008, Texas Transportation Commission Chair Deirdre Delisi, at the request of Texas Governor Rick Perry, appointed a volunteer committee. · Preserveandenhanceurbanandruralmobilityandtheirvalueto theeconomiccompetitivenessofTexas. · EnhancethesafetyofTexas'travelingpublic. · Initiate

313

Secretary of Energy Advisory Board DOE Headquarters Washington...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dr. William Perry 8:30 AM-9:30 AM Key Issues for DOE Secretary Steven Chu 9:30 AM-10:30 AM Small Modular Reactor Presentation Vic Reis, DOE Office of Science 10:30 AM-11:15 AM...

314

July 19, 2012 SEAB Agenda | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2012 SEAB Agenda July 19, 2012 SEAB Agenda 3:00 PM-3:05 PM Process Explanation from Call Operator 3:05 PM-3:15 PM Opening Remarks from Chairman Perry 3:15 PM-3:40 PM...

315

July 19, 2012 SEAB Agenda | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agenda July 19, 2012 SEAB Agenda 3:00 PM-3:05 PM Process Explanation from Call Operator 3:05 PM-3:15 PM Opening Remarks from Chairman Perry 3:15 PM-3:40 PM Update from Buildings...

316

Remote Sensing of Natural Areas: Procedures and Considerations for  

E-Print Network (OSTI)

1 Remote Sensing of Natural Areas: Procedures and Considerations for Assessing Stress and Pollution Jason Goldberg, James Perry, and John Anderson Coastal Ecosystems and Remote Sensing Program Introduction Remote sensing can be defined as the acquisi- tion and measurement of data/information on some

317

RPSEA UNCONVENTIONAL GAS CONFERENCE 2012: Geology, the Environment, Hydraulic Fracturing  

E-Print Network (OSTI)

Recovery and Salt Production - Jim Silva, GE Oil & Gas 9:30 a.m. Appalachian Shale and Barnett Area Water Shale Coalition 8:30 a.m. Meeting Overview & Agenda - Kent Perry, Vice President, Onshore Programs Isotope Interpretation Tools to Optimize Gas Shale Production - Yongchun Tang, PEER Institute Shale Gas

Yener, Aylin

318

ANTH 480: Fall 2012 History of Anthropology  

E-Print Network (OSTI)

) Visions of Culture, by Jerry D. Moore (3rd edition, but an older one will do) (2) Five Key Concepts by appointment [feel free to ask for alternate times if my regular hours don't fit your schedule] Email in Anthropological Thinking, by Richard J. Perry (2003) (3) The Mismeasure of Man, by Stephen J. Gould (any edition

de Lijser, Peter

319

LOUISIANA STATE UNIVERSITY HEALTH SCIENCES CENTER  

E-Print Network (OSTI)

Zihlman# and Jerry Lowenstein ZMOSTechnology Corporation Gifts Totaling $50,000 to $99,999 Anonymous Donor) and Moira (`72) Feingold Jerry Feldman# Financing for Science and Industry Foundation for Deep Ecology PerryToni Fox Demian and Peggy Martin Marcia G. Martin WilliamW. McOmie Suzanne Meyer and Jerry Budin Robin K

320

Making Wavesat the University of Maine Darling Marine Center More cutting-edge research inside  

E-Print Network (OSTI)

Spring Bloom Dr. Mary Jane Perry was one of four principal investigators in the North Atlantic Bloom measurements and experiments were conducted to help interpret the float and glider data. Mary Jane lead-five percent of the students are from Maine and seventy-five percent hale from thirteen other states and one

Boss, Emmanuel S.

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

THEUNIVERSITYOFTEXASATAUSTIN Active Shooter/Suicide After Action Report  

E-Print Network (OSTI)

by the public. Even terms used by the Command Post (CP) were confusing to some members of the search teams down campus to traffic. Figure 3: Search team prepares to enter Jester residence hall (photo by Ralph the front of the Perry- Castañeda Library (PCL). Before he entered the library, he pulled the ski-mask down

322

Secretary of Energy Advisory Board Conference Call Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Chairman Perry 3:15 PM-3:40 PM Update from Buildings Subcommittee 3:40 PM-4:05 PM Update from Small Modular Reactors Subcommittee 4:05 PM-4:30 PM Public Comment 4:30 PM...

323

Secretary of Energy Advisory Board Conference Call  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Overview Dr. William Perry 4:05 PM-4:35 PM Public Comment 4:35 PM-6:00 PM Discussion of the Natural Gas Subcommittee 90-day Report on Shale Gas Production 6:00 PM Adjournment...

324

Veterinary Medicine Research Facility 3B Sustainability Features Veterinary Medicine 3B is a four-story, 76,000 assignable square foot research building dedicated to protecting and  

E-Print Network (OSTI)

and argon gas between panes also prevent unwanted heat loss or gain. Heating and Cooling - Operable windows and demolition waste from the landfill. #12;Future Efficiencies - The project team also considered future energy% of construction waste diverted from landfill disposal 80% less potable water use* *when compared to a similar

Schladow, S. Geoffrey

325

Assignment of human myocyte-specific enhancer binding factor 2C (hMEF2C) to human chromosome 5q14 and evidence that MEF2C is evolutionarily conserved  

SciTech Connect

Human myocyte-specific enhancer binding factor 2C (hMEF2C) belongs to the MEF2 subfamily of the MADS (MCM1, AGAMOUS, DEF A, serum response factor) family of transcription factors. Members of the MADS family share a conserved domain - the MADS domain - that is necessary for DNA binding. Highly conserved versions of the MADS domain and of an adjacent domain that is known as the MEF2 domain are found in members of the MEF2 subfamily. Both of these domains are necessary for binding to the MEF2 regulatory element. This regulatory element is known to be functionally important in a variety of muscle-specific genes and possibly in the brain creatine kinase gene. The MEF2C gene product activates transcription by binding to the MEF2 element. hMEF2C is expressed at high levels in postmitotic neurons in the brain, where it is most abundant in the cerebral cortex, and is also expressed in differentiated myotubes. Several lines of evidence suggest the existence of a rat homologue of MEF2C, and a mouse homologue has been cloned. The mouse gene was mapped to mouse chromosome 13 in a region that is syntenic to human 5q13-q15. 12 refs., 1 fig.

Krainc, D.; Lipton, S.A. [Harvard Medical School, Boston, MA (United States); Haas, M.; Ward, D.C. [Yale Univ. School of Medicine, New Haven, CT (United States)] [and others

1995-10-10T23:59:59.000Z

326

SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assignment Evaluation Form allows ESE candidates to evaluate assignments in terms of the executive core qualities the assignment was intended to meet, how well it met...

327

EIA - Greenhouse Gas Emissions Overview  

Gasoline and Diesel Fuel Update (EIA)

Contacts Contacts This report, Emissions of Greenhouse Gases in the United States 2009, was prepared under the general direction of John Conti, Assistant Administrator for Energy Analysis, and Paul Holtberg, Team Leader, Analysis Integration Team. General questions concerning the content of this report may be directed to the Office of Communications at 202/586-8800. Technical information concerning the content of the report may be obtained from Perry Lindstrom at 202/586-0934 (email, perry.lindstrom@eia.gov). Without the assistance of Science Applications International Corporation (SAIC), this report would not have been possible. In particular we would like to thank Erin Beddingfield, Keith Forbes, Kristin Igusky, Makely Lyon, Michael Mondshine, and Richard Richards. We also wish to acknowledge the

328

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 18890 of 31,917 results. 81 - 18890 of 31,917 results. Download State Energy Program Assurances- Texas Governor Perry http://energy.gov/downloads/state-energy-program-assurances-texas-governor-perry Article Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste WASHINGTON - The Department of Energy (DOE) has issued a Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste (LLRW) and GTCC-Like Waste (DOE/EIS-0375D, Draft EIS) as required under the National Environmental Policy Act for public review and comment. http://energy.gov/em/articles/draft-environmental-impact-statement-disposal-greater-class-c-low Download Final Supplemental Environmental Impact Statement for a Geologic

329

A Proposal to Establish an International Network on Biofixation of CO2 and Greenhouse Gas Abatement with Microalgae  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal to Establish an International Network Proposal to Establish an International Network on Biofixation of CO 2 and Greenhouse Gas Abatement with Microalgae Paola Pedroni (ppedroni@mail.enitecnologie.eni.it; 39 0252 046615) EniTecnologie S.p.A., Environmental Technology Research Center Via F. Maritano 26 20097 San Donato Milanese, Milan, Italy John Davison (john@ieagreen.demon.co.uk; 44 1242 680753) IEA Greenhouse Gas R&D Programme StokeOrchard, Cheltenham, Gloucestershire GL52 7RZ , United Kingdom Heino Beckert (Heino.Beckert@netl.doe.gov; 304 286 4132) National Energy Technology Laboratory, U.S. Department of Energy 3610 Collins Ferry Road Morgantown, West Virginia 26507, USA Perry Bergman (Perry.Bergman@netl.doe.gov; 412 386 4890) National Energy Technology Laboratory, U.S. Department of Energy

330

Mr. Thomas Mahl Granite City Steel Company  

Office of Legacy Management (LM)

8&v/ 8&v/ Mr. Thomas Mahl Granite City Steel Company 20th and State Streets Granite City, IL 62040 Dear Mr. Mahl: This is to notify you that the U.S. Department of Energy (DOE) has designated your company's facility for remedial action as a part of the Formerly Utilized Sites Remedial Action Program. Remedial activities are managed by the DOE Oak Ridge Field Office, and Ms. Teresa Perry (615-576-8956) will be the site manager. As a result of the designation decision, Ms. Perry will be the appropriate point of contact in the future. If you have any questions, please call me at 301-903-8149. W. Alexander Williams, PhD Designation and Certification Manager Division of Off-Site Programs Office of Eastern Area Programs Office of Environmental Restoration

331

Secretary of Energy Advisory Board Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US Department of Energy (DOE) US Department of Energy (DOE) Secretary of Energy Advisory Board Public Meeting October 12, 2011 Committee Members: William Perry, Chair; Norman Augustine; Frances Beinecke; Nicholas Donofrio; Arthur Rosenfeld; Steven Westly Date and Time: 9:30AM - 3:00PM, October 12, 2011 Location: Lawrence Livermore National Laboratory (LLNL), Livermore, CA Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Amy Bodette, Designated Federal Officer DOE Staff: Steven Chu, Secretary of Energy; Tim Frazier, Blue Ribbon Commission Designated Federal Official; Dan Leistikow, Director of Public Affairs; Ian Adams, Office of the Secretary; Alyssa Morrissey, Office of the Secretary Meeting Summary SEAB members heard opening remarks from Chairman Perry and Secretary Chu. Secretary Chu gave a

332

All Eyes on Eastport: Tidal Energy Project Brings Change, Opportunity to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

All Eyes on Eastport: Tidal Energy Project Brings Change, All Eyes on Eastport: Tidal Energy Project Brings Change, Opportunity to Local Community All Eyes on Eastport: Tidal Energy Project Brings Change, Opportunity to Local Community July 24, 2012 - 2:40pm Addthis Captain Gerald "Gerry" Morrison, Vice President of Perry Marine & Consctruction. | Photo Courtesy of Ocean Renewable Power Company. Captain Gerald "Gerry" Morrison, Vice President of Perry Marine & Consctruction. | Photo Courtesy of Ocean Renewable Power Company. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Today in Eastport, Maine, people are gathering to celebrate a project that will harness the power of the massive tides of Cobscook Bay to generate clean electricity. At a public dedication event this afternoon, Portland-based Ocean Renewable

333

International Energy Outlook 1998  

Gasoline and Diesel Fuel Update (EIA)

Contacts Contacts The International Energy Outlook is prepared by the Energy Information Administration (EIA). General questions concerning the contents of the report should be referred to Mary J. Hutzler (202/586-2222), Director, Office of Integrated Analysis and Forecasting, or Arthur T. Andersen (202/586-1441), Director, International, Economic, and Greenhouse Gases Division. Specific questions about the report should be referred toLinda E. Doman (202/586-1041) or the following analysts: World Energy Consumption Arthur Andersen (art.andersen@eia.doe.gov, 202/586-1441) Linda E. Doman (linda.doman@eia.doe.gov, 202/586-1041) World Oil Markets G. Daniel Butler (george.butler@eia.doe.gov, 202/586-9503) Perry Lindstrom (perry.lindstrom@eia.doe.gov, 202/586-0934) Reformulated Gasoline

334

Rotating black hole thermodynamics with a particle probe  

Science Conference Proceedings (OSTI)

The thermodynamics of Myers-Perry black holes in general dimensions are studied using a particle probe. When undergoing particle absorption, the changes of the entropy and irreducible mass are shown to be dependent on the particle radial momentum. The black hole thermodynamic behaviors are dependent on dimensionality for specific rotations. For a 4-dimensional Kerr black hole, its black hole properties are maintained for any particle absorption. 5-dimensional black holes can avoid a naked ring singularity by absorbing a particle in specific momenta ranges. Black holes over 6 dimensions become ultraspinning black holes through a specific form of particle absorption. The microscopical changes are interpreted in limited cases of Myers-Perry black holes using Kerr/CFT correspondence. We systematically describe the black hole properties changed by particle absorption in all dimensions.

Gwak, Bogeun; Lee, Bum-Hoon [Department of Physics and Center of Quantum Spacetime, Sogang University, Seoul 121-742 (Korea, Republic of)

2011-10-15T23:59:59.000Z

335

Experimental particle physics. Progress report, September 16, 1991--September 30, 1992  

SciTech Connect

The goals of this research are the experimental testing of fundamental theories of physics beyond the standard model and the exploration of cosmic phenomena through the techniques of particle physics. We are working on the MACRO experiment, which employs a large-area underground detector to search fore grand unification magnetic monopoles and dark matter candidates and to study cosmic ray muons as well as low- and high-energy neutrinos; the Chooz experiment to search for reactor neutrino oscillations at a distance of 1 km from the source; a new proposal (the Perry experiment) to construct a one-kiloton liquid scintillator in the Fairport, Ohio underground facility IMB to study neutrino oscillations with a 13 km baseline; and development of technology for improved liquid scintillators and for very-low-background materials in support of the MACRO and Perry experiments and for new solar neutrino experiments.

Steinberg, R.I.; Lane, C.E.

1992-09-01T23:59:59.000Z

336

Non-accelerator particle physics  

SciTech Connect

The goals of this research are the experimental testing of fundamental theories of physics such as grand unification and the exploration of cosmic phenomena through the techniques of particle physics. We are working on the MACRO experiment, which employs a large area underground detector to search for grand unification magnetic monopoles and dark matter candidates and to study cosmic ray muons as well as low and high energy neutrinos: the {nu}IMB project, which seeks to refurbish and upgrade the IMB water Cerenkov detector to perform an improved proton decay search together with a long baseline reactor neutrino oscillation experiment using a kiloton liquid scintillator (the Perry experiment); and development of technology for improved liquid scintillators and for very low background materials in support of the MACRO and Perry experiments and for new solar neutrino experiments. 21 refs., 19 figs., 6 tabs.

Steinberg, R.I.; Lane, C.E.

1991-09-01T23:59:59.000Z

337

Experimental particle physics. [Dept. of Physics, Drexel Univ  

SciTech Connect

The goals of this research are the experimental testing of fundamental theories of physics beyond the standard model and the exploration of cosmic phenomena through the techniques of particle physics. We are working on the MACRO experiment, which employs a large-area underground detector to search fore grand unification magnetic monopoles and dark matter candidates and to study cosmic ray muons as well as low- and high-energy neutrinos; the Chooz experiment to search for reactor neutrino oscillations at a distance of 1 km from the source; a new proposal (the Perry experiment) to construct a one-kiloton liquid scintillator in the Fairport, Ohio underground facility IMB to study neutrino oscillations with a 13 km baseline; and development of technology for improved liquid scintillators and for very-low-background materials in support of the MACRO and Perry experiments and for new solar neutrino experiments.

Steinberg, R.I.; Lane, C.E.

1992-09-01T23:59:59.000Z

338

Larch Frequently Asked Questions  

E-Print Network (OSTI)

Architectures with Axiomatic Specifications and Activation Conditions. Department of Electrical and Computer Engineering and Computer Science, PO Box 210030, The University of Cincinnati, Cincinnati, OH, April 1996. Available from the URL `http://www.ece.uc.edu/~pbaraona/vspec/papers/fmcad96.ps'. [Baraona-Alexander96] Phillip Baraona and Perry Alexander. Abstract Architecture Representation Using VSPEC. Department of Electrical and Computer Engineering and Computer Science, PO Box 210030, The University of Cincinnati, Cincinnati, OH, April 1996. Available from the URL `http://www.ece.uc.edu/~pbaraona/vspec/papers/vspec-arch96.ps'. [Baraona-Penix-Alexander95] Phillip Baraona, John Penix, and Perry Alexander. VSPEC: A Declarative Requirements Specification Language for VHDL. In J. M. Berge, O. Levia, and J. Rouilard (eds.), High-Level System Modeling: Specification Languages, pages 51-75. Volume 3 of Current Issues in Electronic Modeling (Kluwer Academic Publishers, June 1995). [Baumeist...

Revision August

1998-01-01T23:59:59.000Z

339

Emissions of Greenhouse Gases in the United States 2009, DOE/EIA-0573(2009)  

Gasoline and Diesel Fuel Update (EIA)

March 2011 www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Emissions of Greenhouse Gases in the United States 2009 ii Contacts This report, Emissions of Greenhouse Gases in the United States 2009, was prepared under the general direction of John Conti, Assistant Administrator for Energy Analysis, and Paul Holtberg, Team Leader, Analysis Integration Team. General questions concerning the content of this report may be directed to the Office of Communications at 202/586-8800. Technical information concerning the content of the report may be obtained from Perry Lindstrom at 202/586-0934 (email, perry. lindstrom@eia.gov). Without the assistance of Science Applications International Corporation (SAIC), this report would not have

340

Better Buildings Challenge Partners Pledge 20 Percent Energy Drop By 2020 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Challenge Partners Pledge 20 Percent Energy Drop Better Buildings Challenge Partners Pledge 20 Percent Energy Drop By 2020 Better Buildings Challenge Partners Pledge 20 Percent Energy Drop By 2020 November 9, 2011 - 10:00am Addthis This is the Atlanta Better Buildings Challenge Breakout Session Panel with representatives from the City of Atlanta Office of Sustainability, Southface, the U.S. General Services Administration, and two Atlanta BBC partner organizations. | Photo courtesy of Fred Perry Photography This is the Atlanta Better Buildings Challenge Breakout Session Panel with representatives from the City of Atlanta Office of Sustainability, Southface, the U.S. General Services Administration, and two Atlanta BBC partner organizations. | Photo courtesy of Fred Perry Photography Maria Tikoff Vargas

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Analysis of Durability of MEAs in Automotive PEMFC Applications - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Randal L. Perry E.I. du Pont de Nemours and Company Chestnut Run Plaza, 701/209 4417 Lancaster Pike Wilmington, DE 19805 Phone: (302) 999-6545 Email: randal.l.perry @usa.dupont.com DOE Managers HQ: Kathi Epping Martin Phone: (202) 586-7425 Email: Kathi.Epping@ee.doe.gov GO: David Peterson Phone: (720) 356-1747 Email: David.Peterson@go.doe.gov Technical Advisor Thomas Benjamin Phone: (630) 252-1632 Email: Benjamin@anl.gov Contract Number: DE-EE0003772 Subcontractors: * Nissan Technical Center North America, Farmington Hills, MI * Illinois Institute of Technology (IIT), Chicago, IL Project Start Date: September 1, 2010

342

CS 302 Data Structures Spring 2013  

E-Print Network (OSTI)

Completed Milestone Planned Actual Assignment received. Requirements understood; detailed specification

Gunes, Mehmet Hadi

343

Evaluating the Differential Effects of Alternative Welfare-to-Work Training Components: A Re-Analysis of the California GAIN Program  

E-Print Network (OSTI)

Qtrs. before Rand. Assign. AFDC Benefits 1 Qtr. before Rand.Assign. AFDC Benefits 4 Qtrs. before Rand.Assign. On AFDC 1 Qtr. before Rand. Assign. On AFDC 4 Qtrs.

Hotz, V. Joseph; Imbens, Guido W.; Klerman, Jacob A.

2005-01-01T23:59:59.000Z

344

NMMSS News nov 2012.cdr  

National Nuclear Security Administration (NNSA)

SAMS 8 SAMS 8 Crosswalk to SAMS D-2/D-3 Updates Training Courses NMMSS Germantown Operations NMMSS Team Members NMMSS Due Dates 2012 NMMSS Calendar NMMSS Mailing Addresses SAMS 8, the most current version is available upon request. If you would like a copy of this software please request by E-Mail (NMMSS@nnsa.doe.gov), FAX (301-903-1998) or phone Greg Perry at (301-903-3656). Please provide

345

DOE F 360.3 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

about the SES candidate, qualifications, and the assignment. SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Developmental Assignment Opportunity More...

346

SES CANDIDATE DEVELOPMENT PROGRAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Developmental Assignment Opportunity DATE: NAME OF SES CANDIDATE: TITLE: ASSIGNMENT NUMBER: ASSIGNMENT BEGINS: ENDS: TELEPHONE NUMBER: FAX NUMBER: EMAIL ADDRESS: ASSIGNMENT LOCATION HOST ORGANIZATION: PURPOSE OF ASSIGNMENT: ASSIGNMENT POSITION: ASSIGNMENT DUTIES: EXECUTIVE COR QUALIFICATIONS TO BE ADDRESSED: OFFICE ADDRESS: TELEPHONE NUMBER: FAX NUMBER: E-MAIL ADDRESS: 1 U.S. DEPARTMENT OF ENERGY SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP)

347

This algorithm performs variable propagation by instantiating values of the variables in the right-hand side of the assignments. In the case of variables that must be used before being reassigned a new value, second interpretation is adopted where `some d  

E-Print Network (OSTI)

Many current safety certification standards are process-based, i.e. they prescribe a set of development techniques and methods. This is perhaps best exemplified by the use of Safety Integrity Levels (SILs), e.g. as defined by IEC 61508 and UK Defence Standard 00-55. SILs are defined according to the level of the risk posed by a system, and hence prescribe the tools, techniques and methods that should be adopted by the development and assessment lifecycle. Product-based certification relies on the generation and assurance of product-specific evidence that meets safety requirements derived from hazard analysis. This evidence can be used as the argument basis in a safety case. However, uncertainty about the provenance of evidence in such a safety case can undermine confidence. To address this problem, we argue that process arguments remain an essential element of any safety case. However, unlike the sweeping process-based integrity arguments of the past, we suggest instead that highly directed process arguments should be linked to the items of evidence used in the product case. Such arguments can address issues of tool integrity, competency of personnel, and configuration management. Much as deductive software safety arguments are desirable, there will always be inductive elements. Process-based arguments of the type we suggest address partly this problem by tackling the otherwise implicit assumptions underlying certification evidence.

Ibrahim Habli

2006-01-01T23:59:59.000Z

348

~tx22C0.ptx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

+ + + + + STUDYING THE COMMUNICATIONS REQUIREMENTS OF ELECTRIC UTILITIES TO INFORM FEDERAL SMART GRID POLICIES + + + + + PUBLIC MEETING + + + + + THURSDAY, JUNE 17, 2010 + + + + + The Public Meeting was held in Room 8E069 at the Department of Energy, Forrestal Building, 1000 Independence Avenue, S.W., Washington, D.C., at 10:00 a.m., Scott Blake Harris, Chair, presiding. PRESENT: BECKY BLALOCK SHERMAN J. ELLIOTT LYNNE ELLYN SCOTT BLAKE HARRIS JIM INGRAHAM JIM L. JONES MICHAEL LANMAN KYLE McSLARROW ROY PERRY 202-234-4433 Neal R. Gross & Co., Inc. Page 2

349

Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Summary and Chapters 1 - 7 May 2006 Draft Environmental Impact Statement for Site Selection for the Expansion of the Strategic Petroleum Reserve Document No. DOE/EIS-0385 Responsible Federal Agency: U.S. Department of Energy (DOE), Office of Petroleum Reserves Location: Potential new SPR storage sites are located in Lafourche Parish, Louisiana; Perry and Claiborne Counties, Mississippi; and Brazoria County, Texas. Existing Strategic Petroleum Reserve (SPR) storage sites that could be expanded are located in Cameron, Calcasieu, and Iberville Parishes, Louisiana; and Jefferson County, Texas. Associated pipelines, marine terminals, and other facilities that might be developed are located in East Baton Rouge, East Feliciana, St. James, Terrebonne, West Baton

350

Microsoft Word - FinalReport2-20Vol[1].1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

By: Dr. John N. O'Brien Principal Investigator President and CEO Joel Blau Matthew Rose Senior Consultants Project Prepared for and Supported by: U.S. Department of Energy National Energy Technology Laboratory Gasification Technologies Program and National Association of Regulatory Utility Commissioners March 2004 i Acknowledgements The authors would like to acknowledge the help and assistance of a number of people in the development and completion this report. These people include Carl Bauer, Gary Steigel, and Mildred Perry of the National Energy Technologies Laboratory; Massood Ramezan and Jay Ratafia-Brown of SAIC; Jim Childress of the Gasification Technologies Council; Andrew Spahn and Karl Stellrecht of the National Association of

351

Slide 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Victor H. Reis Victor H. Reis Office of Undersecretary for Science (Matthew Crozat) Nuclear Energy U.S. Department of Energy A Strategy for U.S. Nuclear Power: "Changing the Game" with Small Modular Reactors (SMR) Secretary of Energy's Advisory Board July 20, 2011 Bill Perry Chairman Origins of this SMR "Small" Study * Will SMRs "change the game" for U.S Nuclear Power? If so, what is the role of DOE? Koonin (Stockpile Stewardship "changed game" in Nuclear Weapons: Underground Testing to Validated Simulation) Can you do an ASCI (Stockpile

352

 

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alvin A. Taylor Alvin A. Taylor Director Robert D. Perry Director, Office of Environmental Programs South Carolina Department of Natural Resources 1000 Assembly Street Suite 336 PO Box 167 Columbia, SC 29202 803.734.4199 Office 803.734.9809 Fax vejdaniv@dnr.sc.gov September 27, 2013 Julie A. Smith Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 REF: Request for Information (RFI) Improving Performance of Federal Permitting and Review of Infrastructure Projects

353

Fundamental studies of the mechanism of catalytic reactions with catalysts effective in the gasification of carbon solids and the oxidative coupling of methane. Quarterly report, October 1--December 31, 1993  

SciTech Connect

This report covers the time period from October 1 through December 31, 1993. A description of tasks for fiscal year 1994 is included in this report. Highlights and progress of work performed during this quarter is reported in (a) catalytic steam gasification of coals and cokes; (b) oxidative coupling of methane; and (c) synthesis and characterization of catalysts. Attached to this report is a copy of a manuscript submitted to Proceeding of Fuels Technology Contractors Meeting {open_quotes}Steady-State and Transient Catalytic Oxidation and Coupling of Methane{close_quotes} by Heinemann, Iglesia, and Perry.

Heinemann, H.; Iglesia, E.; Perry, D.L.

1993-12-01T23:59:59.000Z

354

Recent developments: Industry briefs  

Science Conference Proceedings (OSTI)

This article is the `Industry Briefs` portion of Nuexco`s September 1992 `Recent Developments` section. Specific iems discussed include: (1) merger of Urangesellschaft and Interuran, (2) cessation of uranium mining in Bulgaria, (3) record operation of Limerick-2 and Tokai-2, (4) MRS in Wyoming, (5) low-level waste facilities at Perry, (6) closure of Trojan, (7) restart of Kozloduy-6, (8) agreements between Cogema and Minatom, (9) planning for a large nuclear power plant in Japan moves forward, (10) order of a new reactor at Civaux, (11) relicensing of Yankee Rowe, (12) operation of Bradwell-2, and (13) high-level waste management in Japan.

NONE

1992-09-01T23:59:59.000Z

355

Duality Invariance: From M-theory to Double Field Theory  

E-Print Network (OSTI)

We show how the duality invariant approach to M-theory formulated by Berman and Perry relates to the double field theory proposed by Hull and Zwiebach. In doing so we provide suggestions as to how Ramond fields can be incorporated into the double field theory. We find that the standard dimensional reduction procedure has a duality invariant (doubled) analogue in which the gauge fields of the doubled Kaluza-Klein ansatz encode the Ramond potentials. We identify the internal gauge index of these gauge fields with a spinorial index of O(d,d).

Daniel C. Thompson

2011-06-20T23:59:59.000Z

356

Extended, Continuous Pt Nanostructures in Thick, Dispersed Electrodes - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Bryan Pivovar (Primary Contact), Shyam Kocha, KC Neyerlin, Jason Zack, Shaun Alia, Arrelaine Dameron, Tim Olson, Svitlana Pylypenko, Justin Bult, Brian Larsen, Jeremy Leong, Niccolo Aieta, Guido Bender National Renewable Energy Laboratory (NREL) 15013 Denver West Parkway Golden, CO 80401 Phone: (303) 275-3809 Email: Bryan.Pivovar@nrel.gov DOE Manager HQ: Kathi Epping Martin Phone: (202) 586-7425 Email: Kathi.Epping@ee.doe.gov Subcontractors: * Kelly Perry, Oak Ridge National Laboratory (ORNL), Oak Ridge, TN * Rod Borup, Los Alamos National Laboratory (LANL), Los Alamos, NM * Yushan Yan, University of Delaware, Newark, DE

357

JOBAID-REGISTRATION (SUPERVISOR) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phone 202-586-9552 More Documents & Publications JOBAID-VIEWING AN EMPLOYEE MATRIX (SUPERVISOR) JOBAID-ASSIGNING AN ALTERNATE SUPERVISOR (SUPERVISOR) JOBAID-ASSIGNING...

358

Randy J. Weidner | Renewable Energy Group | Sustainable Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Science & Technology Department assigned to provide technical assistance to the NRC. National Grid: Senior Foreperson - Electric, 2005 - 2011 Assigned to the Far Rockaway...

359

SESCDP Supervisor's Evaluation of Candidate's Performance During...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assignment Form used by SES Supervisor to evaluate a SES candidate's performance in terms of meeting assignment objectives, an overall rating of the candidate's performance,...

360

Audit of the Department of Energy's Management of Field Contractor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Employees Assigned to Headquarters and Other Federal Agencies, DOEIG-0414 Audit of the Department of Energy's Management of Field Contractor Employees Assigned to...

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

All Active DOE Technical Standards Document | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration Number Assignments (Active) Project Registration Number Assignments (Completed) Technical Standards, DOE Orders and Applicable CFRsDEAR Crosswalk - February 2, 200...

362

Algorithms for irreducible infeasible subset detection in CSP - Application to frequency planning and graph k-coloring.  

E-Print Network (OSTI)

??The frequency assignment (FAP) consists in assigning the frequency on the radio links of a network which satisfiesthe electromagnetic interference among the links. Given the (more)

Hu, Jun

2012-01-01T23:59:59.000Z

363

January 31, 2012 Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Room 1E-245 Department of Energy Room 1E-245 1000 Independence Avenue, SW Washington, DC 20585 January 31, 2012 8:30 AM-8:45 AM Welcome, Overview, Announcement of New Co-Chair Chairman William Perry 8:45 AM-9:45 AM Grand Challenges in Energy Secretary Steven Chu 9:45 AM-10:15 AM Renewable Energy and Energy Efficiency Finance Richard Kauffman 10:15 AM-11:00 AM SunShot Tech Team Ramamoorthy Ramesh, Minh Le, Rachel Tronstein 11:00 AM-11:30 AM Batteries Tech Team Dave Howell, Dave Danielson 11:30 AM-11:45 AM Break/CLOSED Administrative Session 11:45 AM-12:00 PM Buildings Subcommittee Report Steven Westly 12:00 PM-12:15 PM Establishment of SMR Subcommittee Chairman William Perry, Nicholas Donofrio 12:15 PM-1:00 PM Blue Ribbon Commission Report Discussion

364

Hybrid Renewable Energy Systems for a Dynamically Positioned Buoy  

E-Print Network (OSTI)

course assignments. From left to right, the 2012 Fellows: Laryssa Galvez, Ariel Pacific, Chelsea Maccani

Wood, Stephen L.

365

Microsoft Word - DRAFT SRSPM 250-1-1A.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Assignment and Utilization Policy ... 9 CHAPTER VI - Environmental Management System Policy ... 10 CHAPTER...

366

Improving the Cyber Workforce  

Science Conference Proceedings (OSTI)

... assigned; regardless of job series/ occupational specialty ... Defense Nuclear Facilities Safety Board ? Director of National Intelligence ...

2008-08-05T23:59:59.000Z

367

CHEIBA Trust Employee Benefit Plan 2013 PlanYear  

E-Print Network (OSTI)

to any lien, garnishment, pledge or bankruptcy. However, a Participant may assign benefits payable under

368

BENEFIT ELIGIBILITY Benefits under the CHEIBA Trust Plan are available to Eligible Employees and Dependents of  

E-Print Network (OSTI)

to any lien, garnishment, pledge or bankruptcy. However, a Participant may assign benefits payable under

369

NYSERDA's RPS Customer Sited Tier Fuel Cell Program  

E-Print Network (OSTI)

Date received Approved by Project # Number of hours Driver Assigned Hourly Rate Fuel Surcharge Total

370

The Impact of Negative Acknowledgments in Shared Memory Scientific Applications  

E-Print Network (OSTI)

INTRODUCTION DSM multiprocessors employing home-based cache coherence protocols assign a home node to each

Heinrich, Mark

371

NREL: Regional Energy Deployment System (ReEDS) Model - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional Energy Deployment System (ReEDS) Model Energy Analysis ReEDS Regional Energy Deployment System Model Regional Energy Deployment System (ReEDS) Model Energy Analysis ReEDS Regional Energy Deployment System Model Search More Search Options Site Map Printable Version Publications The following are publications - including technical reports, journal articles, conference papers, and posters - focusing on the Wind Deployment System (WinDS) and Regional Energy Deployment System (ReEDS) models. Technical Reports Eurek, K.; Denholm, P.; Margolis, R.; Mowers, M. (2013). Sensitivity of Utility-Scale Solar Deployment Projections in the SunShot Vision Study to Market and Performance Assumptions. 55 pp.; NREL Report No. TP-6A20-55836. Martinez, A.; Eurek, K.; Mai, T.; Perry, A. (2013). Integrated Canada-U.S. Power Sector Modeling with the Regional Energy Deployment System (ReEDS).

372

Reference Shelf  

NLE Websites -- All DOE Office Websites (Extended Search)

Reference Shelf Reference Shelf Reference Shelf Find reference sources Questions? 505-667-5809 Email Biography Biographies of Women in Science Biography.com Marquis Who's Who NobelPrize.org Nobel Prize Internet Archive Calculators Currency Converter OnlineConversion.com Wolfram|Alpha Computational Knowledge Engine Dictionaries Oxford English Dictionary Merriam-Webster Dictionary DOD Dictionary of Military Terms Encyclopedias Britannica Online Columbia Encyclopedia Wikipedia Grants & Funding DOE Office of Science Grants & Contracts National Science Foundation National Institutes of Health Grants.Gov FedBizOpps.gov Los Alamos Info Los Alamos County Los Alamos Historical Society University of New Mexico - Los Alamos Campus Maps Atlapedia Online Perry-Casteneda Library Map Collection U.S. Gazetteer

373

Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

30 results: 30 results: BibTex RIS RTF XML Sort by: Author Title Type [ Year (Desc) ] Filters: Author is Peter Cappers [Clear All Filters] 2013 Hoen, Ben, Jason P. Brown, Thomas Jackson, Ryan H. Wiser, Mark Thayer, and Peter Cappers. A Spatial Hedonic Analysis of the Effects of Wind Energy Facilities on Surrounding Property Values in the United States. LBNL, 2013. Cappers, Peter, Annika Todd, Michael Perry, Bernard Neenan, and Richard Boisvert. Quantifying the Impacts of Time-based Rates, Enabling Technology, and Other Treatments in Consumer Behavior Studies: Protocols and Guidelines., 2013. Todd, Annika, Peter Cappers, and Charles A. Goldman. Residential Customer Enrollment in Time-based Rate and Enabling Technology Programs: Smart Grid Investment Grant Consumer Behavior Study Analysis., 2013.

374

Data:Da243377-f4d4-4689-9213-e22218df8d4d | Open Energy Information  

Open Energy Info (EERE)

43377-f4d4-4689-9213-e22218df8d4d 43377-f4d4-4689-9213-e22218df8d4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

375

Slide 1  

NLE Websites -- All DOE Office Websites (Extended Search)

New Integrated Cloud New Integrated Cloud Observation Capabilities of Wyoming King Air by Combing Remote Sensors and In Situ Probes Acknowledgment: NSF ATM and CAREER, ONR, NASA, DOE Zhien Wang, Perry Wechsler, Jeff French, Alfred Rodi, Samuel Haimov, Gabor Vali, and Dave Leon University of Wyoming Andrew L. Pazmany Prosensing Inc. The General Goals of Cloud Observations * Build a reliable cloud Climatology * Understand cloud microphysical properties and processes * Understand cloud- dynamical-radiation feedbacks * Improve cloud simulations in models Cloud Physics Processes In Numerical models * Cloud physics processes are explicitly simulated or parameterized in models. * Many cloud physics processes can't directly measured. Lin et al. (1983) Climate Weather It is not easy to collect

376

Secretary of Energy Advisory Board Meeting Agenda Argonne National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Argonne National Laboratory Building 401 9700 S. Cass Avenue Lemont, IL 60439 April 17, 2012 8:30 AM-9:00 AM Closed Tour of Advanced Photon Source Eric Isaacs, Director of Argonne National Laboratory 9:00 AM-9:15 AM Welcome & Overview Chairman William Perry Co-Chair Nicholas Donofrio 9:15 AM-10:00 AM Remarks from the Secretary Secretary Steven Chu 10:00 AM-10:45 AM Transformative Role of Computation and 'Big Data' Ian Foster, Director, Computation Institute 10:45 AM-11:45 AM Transportation Technology R&D Presentation Don Hillebrand, Director, Energy Systems 11:45 AM-12:45 PM Materials Solutions for the Energy Economy Peter Littlewood, Associate Laboratory Director 12:45 PM-1:00 PM SMR Subcommittee Report

377

PNNL Regional High School Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

PNNL Regional High School PNNL Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov Washington Regions PNNL Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Beth Perry Email: bethperry13@msn.com Regional Event Information Date: Saturday, February 22, 2014 Maximum Number of Teams: 24 Maximum Number of Teams per School: 3

378

FESAC Agenda - July 2007 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

July 2007 July 2007 Fusion Energy Sciences Advisory Committee (FESAC) FESAC Home Meetings Members Charges/Reports Charter .pdf file (140KB) FES Committees of Visitors FES Home Meetings FESAC Agenda - July 2007 Print Text Size: A A A RSS Feeds FeedbackShare Page Fusion Energy Sciences Advisory Committee Meeting Gaithersburg Hilton 620 Perry Parkway, Gaithersburg July 16-17, 2007 AGENDA Date/Time Topic Speaker July 16 09:00 Meeting Agenda and Logistics Professor Stewart Prager, FESAC Chair 09:05 OFES Perspective, FY 2008 Budget Status Dr. Raymond Fonck .pdf file (334KB), Associate Director for Fusion Energy Sciences 09:35 Report on the Fusion Simulation Project Workshop .pdf file (337KB) Dr. Arnold Kritz .pdf file (337KB)Kritz, Lehigh University 10:35 Break 10:50 Preliminary Report of the Panel on the FSP Charge

379

October 2008 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

8 8 Advanced Scientific Computing Advisory Committee (ASCAC) ASCAC Home Meetings November 2013 March 2013 October 2012 August 2012 March 2012 November 2011 August 2011 March 2011 November 2010 August 2010 March 2010 November 2009 August 2009 March 2009 October 2008 August 2008 February 2008 November 2007 August 2007 February 2007 November 2006 August 2006 March 2006 April 2004 March 2003 October 2002 May 2002 October 2001 May 2001 November 2000 Members Charges/Reports Charter .pdf file (38KB) ASCR Committees of Visitors ASCR Home Meetings October 2008 Print Text Size: A A A RSS Feeds FeedbackShare Page The Fall 2008 ASCAC meeting was October 28-29, 2008 at the Hilton Washington D.C. North/Gaithersburg, 620 Perry Parkway, Gaithersburg, MD 20877 USA. * Agenda .pdf file (16KB) * Minutes .pdf file (103KB)

380

FESAC Agenda - October 2007 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

October 2007 October 2007 Fusion Energy Sciences Advisory Committee (FESAC) FESAC Home Meetings Members Charges/Reports Charter .pdf file (140KB) FES Committees of Visitors FES Home Meetings FESAC Agenda - October 2007 Print Text Size: A A A RSS Feeds FeedbackShare Page Fusion Energy Sciences Advisory Committee Meeting Gaithersburg Hilton 620 Perry Parkway, Gaithersburg October 23-24, 2007 Agenda Time Topic Speaker October 23 8:30 Meeting Agenda and Logistics Prof. Stewart Prager, UWisc, FESAC Chair 8:35 OFES Perspective Dr. Raymond Fonck .pdf file (157KB), Associate Director for Fusion Energy Sciences, DOE 9:30 Report from the Panel on the Fusion Simulation Program Dr. Bill Tang .pdf file (770KB), PPPL Break Discussion of the report FESAC 11:45 Lunch 12:45 Report from the Panel on Strategic Planning

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

FESAC Agenda - January 2009 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

January 2009 January 2009 Fusion Energy Sciences Advisory Committee (FESAC) FESAC Home Meetings Members Charges/Reports Charter .pdf file (140KB) FES Committees of Visitors FES Home Meetings FESAC Agenda - January 2009 Print Text Size: A A A RSS Feeds FeedbackShare Page Fusion Energy Sciences Advisory Committee Meeting Gaithersburg Hilton 620 Perry Parkway 301-977-8900 January 13, 2009 Time Duration Topic Speaker 8:00 5 Meeting Agenda and Logistics Professor Riccardo Betti, University of Rochester, FESAC Vice-Chair 8:05 40 Office of Science Perspectives Dr. Patricia Dehmer, Deputy Director for Science Programs, DOE 8:45 45 OFES Perspectives Steve Eckstrand, Acting Associate Director for Fusion Energy Sciences, DOE 9:30 15 Break 9:45 90 Final Report: Panel on High Energy Density Laboratory Plasmas

382

November 2007 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

7 7 Advanced Scientific Computing Advisory Committee (ASCAC) ASCAC Home Meetings November 2013 March 2013 October 2012 August 2012 March 2012 November 2011 August 2011 March 2011 November 2010 August 2010 March 2010 November 2009 August 2009 March 2009 October 2008 August 2008 February 2008 November 2007 August 2007 February 2007 November 2006 August 2006 March 2006 April 2004 March 2003 October 2002 May 2002 October 2001 May 2001 November 2000 Members Charges/Reports Charter .pdf file (38KB) ASCR Committees of Visitors ASCR Home Meetings November 2007 Print Text Size: A A A RSS Feeds FeedbackShare Page The November 6-7, 2007, Advisory Committee Meeting was held at the Hilton Gaithersburg, 620 Perry Parkway, Gaithersburg, MD. * Agenda .pdf file (16KB) * Minutes .pdf file (45KB) * Presentations:

383

Notice of Intent to Prepare an Environmental Impact Statement for Depleted Uranium Hexafluoride Conversion Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

123 123 Federal Register / Vol. 66, No. 181 / Tuesday, September 18, 2001 / Notices Section 615-Procedural Safeguards Topic Addressed: Due Process Hearings * Letter dated April 19, 2001 to Virginia Department of Education Director Judith A. Douglas, regarding whether a State educational agency is required to convene a due process hearing initiated by someone other than the parent of a child with a disability or a public agency. Topic Addressed: Surrogate Parents * Letter dated April 16, 2001 to Pinal County, Arizona Deputy County Attorney Linda L. Harant, regarding the appointment of surrogate parents for children who are wards of a tribal court. Topic Addressed: Student Discipline * Letter dated April 16, 2001 to Professor Perry A. Zirkel, regarding the calculation of disciplinary removals of

384

The Risk Assessment Information System  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Profile Tool Chemical Profile Tool Using the Chemical Data Profiles Tool Click on the steps below for detailed instructions about each page of the Chemical Data Profiles Tool. 1. Select Chemical 2. Chemical Profile 1. Select Chemical Select the chemical of interest and click "submit". 2. Chemical Profile Basic information for the chemical is shown in the first section. Next, toxicity infomation (Oral RfDs, Inhalation RfCs, and Cancer Toxicity Values) is displayed in tables filled with data from IRIS, PPRTV, ATSDR, CALEPA, and HEAST. The last section contains an extensive list of parameters for the chemical followed by tables of parameters from EPI, CRC, PERRY, LANGE, and YAWS. Hover over the source to see more information. The "Back" button can be used to view a different chemical profile.

385

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 24200 of 26,764 results. 91 - 24200 of 26,764 results. Download Before the House Science, Space, and Technology Subcommittee on Investigations and Oversight Subject: Rare Earth Elements By: David Sandalow, Assistant Secretary Office of Policy and International Affairs http://energy.gov/congressional/downloads/house-science-space-and-technology-subcommittee-investigations-and-oversight Download PJM Presentation- The Silver Bullet: Storage! (July 12, 2011) Presentation by Terry Boston, President and CEO pf PJM Interconnection before the Electricity Advisorty Committee, July 12, 2011, on storage for the smart grid. http://energy.gov/oe/downloads/pjm-presentation-silver-bullet-storage-july-12-2011 Download Secretary of Energy Advisory Board- July 20, 2011 Meeting Minutes SEAB members heard opening remarks from Chairman Perry and Secretary Chu.

386

Distributed Generation Study/Emerling Farm | Open Energy Information  

Open Energy Info (EERE)

Emerling Farm Emerling Farm < Distributed Generation Study Jump to: navigation, search Study Location Perry, New York Site Description Agricultural Study Type Long-term Monitoring Technology Internal Combustion Engine Prime Mover Caterpillar G379 Heat Recovery Systems Built-in Fuel Biogas System Installer RCM Digesters System Enclosure Dedicated Shelter System Application Combined Heat and Power Number of Prime Movers 1 Stand-alone Capability Seamless Power Rating 200 kW0.2 MW 200,000 W 200,000,000 mW 2.0e-4 GW 2.0e-7 TW Nominal Voltage (V) 480 Heat Recovery Rating (BTU/hr) 2000000 Cooling Capacity (Refrig/Tons) Origin of Controller Manufacturer-Integrated Component Integration Factory Integrated Start Date 2006/06/07 Monitoring Termination Date 1969/12/31 Primary Power Application Based Load

387

Data:4b2b4185-5068-4de4-92f5-489a7814d034 | Open Energy Information  

Open Energy Info (EERE)

b4185-5068-4de4-92f5-489a7814d034 b4185-5068-4de4-92f5-489a7814d034 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 15W Mercury Vapor Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

388

Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the Secretary of Energy Advisory Board Public Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 SEAB members heard opening remarks from Chairman Perry and Secretary Chu. Secretary Chu gave a presentation on DOE in the innovation chain. Following Secretary Chu's opening session was a "Director's Perspective" from George Miller, LLNL Director. Dr. Miller's presentation was followed by presentations from LLNL on the National Ignition Facility (NIF), cyber security, and computational advances in applied energy. Following the lab presentations, the Board heard updates from the Natural Gas Subcommittee and the Building Efficiency Subcommittee. The last session of the meeting

389

Slide 1  

NLE Websites -- All DOE Office Websites (Extended Search)

Fourier Transform Profilometry (FTP) Fourier Transform Profilometry (FTP) for Mapping Tank Residuals Ping-Rey Jang, Zhiling Long, O. Perry Norton, Lee Gresham, and David L. Monts Institute for Clean Energy Technology (ICET) Mississippi State University May 20, 2009 Fourier Transform Profilometry (FTP) for Mapping Tank Residuals 2 ●Need for FTP ●Overview of FTP Technique ●FTP at Maximum Tank Distance ●Identification and Characterization of Uncertainties -Inherent -Instrumental ●Summary ●Path Forward Agenda Fourier Transform Profilometry (FTP) for Mapping Tank Residuals Bottom of Hanford Tank C-106 3 Improved tools for residual waste volume determination are expected to provide site operators and regulators with verifiable information that can be used in determination of closure timelines.

390

Issues Related to Seismic Activity Induced by the Injection of CO2 in Deep Saline Aquifiers  

NLE Websites -- All DOE Office Websites (Extended Search)

ISSUES RELATED TO SEISMIC ACTIVITY INDUCED BY THE INJECTION ISSUES RELATED TO SEISMIC ACTIVITY INDUCED BY THE INJECTION OF CO 2 IN DEEP SALINE AQUIFERS Joel Sminchak (sminchak@battelle.org; 614-424-7392) Neeraj Gupta (gupta@battelle.org; 614-424-3820) Battelle Memorial Institute 505 King Avenue Columbus, Ohio 43201 Charles Byrer (a) and Perry Bergman (b) National Energy Technology Laboratory (a) P.O. Box 880, Morgantown, WV, 26507-0880 (b) P.O. Box 10940, Pittsburgh, PA, 15236-0940 Abstract Case studies, theory, regulation, and special considerations regarding the disposal of carbon dioxide (CO 2 ) into deep saline aquifers were investigated to assess the potential for induced seismic activity. Formations capable of accepting large volumes of CO 2 make deep well injection of CO 2 an attractive option. While seismic implications must be considered for injection

391

Flow Cells for Energy Storage Workshop Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Summary Report Workshop Summary Report Prepared for: U. S. Department of Energy Prepared by: Dr. Adam Z. Weber Lawrence Berkeley National Laboratory Organizing Committee: Michael Perry, UTRC Tom Zawodzinski, UTK and ORNL Ned Stetson, DOE EERE Mark Johnson, DOE ARPA-E Imre Gyuk, DOE OEDER i Executive Summary An essentially identical technology to a reversible fuel cell is that of a redox flow cell (RFC) or redox flow battery (RFB), where a RFC can be seen as merging the concepts of RFBs with recent improvements in fuel cells. To investigate how a RFC can be a grid-scale electrical- energy-storage (EES) system and the associated technological needs, this workshop was held. The specific objectives of the workshop were to understand the needs for applied research in RFCs; identify the grand challenges and prioritize R&D needs; and gather input for future

392

Data:Cdc18f8d-cdeb-4113-999a-b0aceaa3fca1 | Open Energy Information  

Open Energy Info (EERE)

Cdc18f8d-cdeb-4113-999a-b0aceaa3fca1 Cdc18f8d-cdeb-4113-999a-b0aceaa3fca1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 1000W Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

393

Data:Def49043-461c-4c72-bdf7-4e68c6ff240a | Open Energy Information  

Open Energy Info (EERE)

Def49043-461c-4c72-bdf7-4e68c6ff240a Def49043-461c-4c72-bdf7-4e68c6ff240a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 400W Metal Halide Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

394

Secretary of Energy Advisory Board Meeting Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Agenda Meeting Agenda U.S. Department of Energy, Room 1E-245 1000 Independence Avenue SW Washington, DC November 16, 2012 8:00 AM-8:15 AM Welcome & Overview Chairman William Perry Co-Chair Nicholas Donofrio 8:15 AM-8:45 AM Public Comment on the Subcommittee Draft Reports 8:45 AM-9:30 AM Small Modular Reactors Subcommittee Report and Committee Discussion Nicholas Donofrio, Norm Augustine, Frances Beinecke 9:30 AM-10:15 AM Buildings Subcommittee Report and Committee Discussion Steve Westly, Michael McQuade, Matt Rogers, Art Rosenfeld (by phone) 10:15 AM-10:30 AM Break 10:30 AM-11:15 AM Report Discussion with Secretary Chu 11:15 AM-12:15 PM DOE's Role in Hurricane Sandy Recovery

395

Data:28261509-fdd1-490c-9179-08e7cad9c1d7 | Open Energy Information  

Open Energy Info (EERE)

-fdd1-490c-9179-08e7cad9c1d7 -fdd1-490c-9179-08e7cad9c1d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Small Industrial- Time-of-Use Sector: Industrial Description: This type of service is Time of Use Demand Rate. Medium and Small Industrial Users may elect and have Time of Use Demand metering. Any such election shall commence with June usage, be for a minimum of one year, and will automatically renew until otherwise canceled. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf

396

Portsmouth Site Delivers First Radioactive Waste Shipment to Disposal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delivers First Radioactive Waste Shipment to Delivers First Radioactive Waste Shipment to Disposal Facility in Texas Portsmouth Site Delivers First Radioactive Waste Shipment to Disposal Facility in Texas August 27, 2013 - 12:00pm Addthis Waste management and transportation personnel worked late to complete the first shipment to WCS. Through a contract with DOE, WCS will treat and accept potentially hazardous waste that has been at the Portsmouth site for decades. Pictured (from left) are Scott Fraser, Joe Hawes, Craig Herrmann, Jim Book, John Lee, John Perry, Josh Knipp, Melissa Dunsieth, Randy Barr, Rick Williams, Janet Harris, Maureen Fischels, Cecil McCoy, Trent Eckert, Anthony Howard and Chris Ashley. Waste management and transportation personnel worked late to complete the first shipment to WCS. Through a contract with DOE, WCS will treat and

397

Characterization of Fuel Cell Materials - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Karren L. More Oak Ridge National Laboratory (ORNL) 1 Bethel Valley Rd. Oak Ridge, TN 37831-6064 Phone: (865) 574-7788 Email: morekl1@ornl.gov DOE Manager HQ: Donna Ho Phone: (202) 586-8000 Email: Donna.Ho@ee.doe.gov Contributors: * David Cullen (ORNL) * Miaofang Chi (ORNL) * Kelly Perry (ORNL) Project Start Date: Fiscal Year (FY) Year 1999 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Develop and/or apply novel preparation, imaging, and * analytical methods to characterize fuel cell materials and architectures in the as-processed (fresh) state, during

398

'Extreme Makeover: Home Edition' Builds Efficiently | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'Extreme Makeover: Home Edition' Builds Efficiently 'Extreme Makeover: Home Edition' Builds Efficiently 'Extreme Makeover: Home Edition' Builds Efficiently February 12, 2010 - 9:30am Addthis Joshua DeLung You may recall this post on Energy Empowers, which previewed an upcoming episode of ABC's "Extreme Makeover: Home Edition" where the U.S. Department of Energy collaborated with builders to incorporate energy-efficiency and renewable energy technologies at The Fishing School, one of two such collaborative projects in an episode that was set to air during a special 2010 Valentine's Day episode, featuring filmmaker Tyler Perry as a guest. The episode aired and told the story of energy efficiency changing the lives of some very special mentors and of America's youth. Additionally, Clean Skies News covered the builds. Here's its first video

399

Secretary of Energy Advisory Board - July 20, 2011 Meeting Minutes |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary of Energy Advisory Board - July 20, 2011 Meeting Minutes Secretary of Energy Advisory Board - July 20, 2011 Meeting Minutes Secretary of Energy Advisory Board - July 20, 2011 Meeting Minutes SEAB members heard opening remarks from Chairman Perry and Secretary Chu. The first session was a presentation on small modular reactors from the Office of Science and the Office of Nuclear Energy. The Board heard updates from the Natural Gas Subcommittee and the Building Efficiency Subcommittee. In the last session before the lunch break the Board heard from Under Secretary Steve Koonin on the progress of the Energy QTR. The last session of the meeting was a presentation of the report from the Technology Transition Subcommittee and discussion. The discussion followed the issues and timing as presented in the meeting agenda.

400

Agenda20120921 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Agenda September 21, 2012 Agenda September 21, 2012 Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Meetings Agenda September 21, 2012 Print Text Size: A A A RSS Feeds FeedbackShare Page DOE/NSF Nuclear Science Advisory Committee Meeting September 21, 2012 Where: Hilton Washington DC North/Gaithersburg, Montgomery Ballroom, 620 Perry Parkway, Gaithersburg, Maryland 20877, 301-977-8900 Purpose/Topics: Perspectives from Department of Energy and National Science Foundation Update from the Department of Energy and National Science Foundation's Nuclear Physics Office's Presentation of the Charge for the Committee of Visitors Status of the Charge for the Implementation of the Long Range Plan Presentation on the NP2010 NRC Report

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

FESAC Agenda - November 2008 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

November 2008 November 2008 Fusion Energy Sciences Advisory Committee (FESAC) FESAC Home Meetings Members Charges/Reports Charter .pdf file (140KB) FES Committees of Visitors FES Home Meetings FESAC Agenda - November 2008 Print Text Size: A A A RSS Feeds FeedbackShare Page Fusion Energy Sciences Advisory Committee Meeting Gaithersburg Hilton 620 Perry Parkway 301-977-8900 Agenda November 6-7, 2008 Time Topic Speaker November 6 8:30 During this time we will swear in new members. ALL MEMBERS WILL THEN ATTEND THE ANNUAL ETHICS BRIEFING THIS SESSION IS FOR MEMBERS ONLY. THE MEETING DOES NOT BEGIN UNTIL 9:00 A.M. 9:00 Meeting Agenda and Logistics FESAC Chair 9:05 OFES Perspectives .pdf file (84KB) Gene Nardella, Acting Associate Director for Fusion Energy Sciences, DOE 10:00 Break 10:15 Outline of Strategic Overview Plan .pdf file (72KB)

402

FESAC Agenda - February 2008 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

8 8 Fusion Energy Sciences Advisory Committee (FESAC) FESAC Home Meetings Members Charges/Reports Charter .pdf file (140KB) FES Committees of Visitors FES Home Meetings FESAC Agenda - February 2008 Print Text Size: A A A RSS Feeds FeedbackShare Page Fusion Energy Sciences Advisory Committee Meeting Gaithersburg Hilton 620 Perry Parkway, Gaithersburg 301-977-8900 February 19-20, 2008 Agenda Time Topic Speaker February 19 9:00 Meeting Agenda and Logistics Prof. Stewart Prager, FESAC Chair, University of Wisconsin 9:05 OFES Perspectives and Strategic Planning Needs .pdf file (215KB) Dr. Raymond Fonck, Associate Director for Fusion Energy Sciences, DOE 10:00 ITER Project Status .pdf file (1.1MB) Dr. Ned Sauthoff, Director U.S. ITER Project Office 10:30 DOE Perspectives .pdf file (86KB)

403

December 1, 2011 | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

December 1, 2011 December 1, 2011 Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Meetings December 1, 2011 Print Text Size: A A A RSS Feeds FeedbackShare Page DOE/NSF Nuclear Science Advisory Committee Meeting December 1, 2011 Where: Hilton Washington DC North/Gaithersburg, 620 Perry Parkway, Gaithersburg, MD. Phone Number: 301-977-8900 Purpose/Topics: Perspectives from Department of Energy and National Science Foundation Update from the Department of Energy and National Science Foundation's Nuclear Physics Office's Update on the Neutron Charge Subcommittee Report Public Comment (10-minute rule) For further information you may contact Brenda May at 301-903-0536 AGENDA Thursday, December 1 Time Topic Speaker

404

Data:436bd023-2d2d-4202-b859-0b278bb80ef2 | Open Energy Information  

Open Energy Info (EERE)

bd023-2d2d-4202-b859-0b278bb80ef2 bd023-2d2d-4202-b859-0b278bb80ef2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Residential- All-Electric Sector: Residential Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

405

EA-1888-FEA-AppendixA-2012.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

APPENDIX A. APPENDIX A. Scoping Letter, Notice of Availability and Distribution Lists 1 Scoping Letter Distribution List Tribal Contacts Aroostook Band of Micmac Indians Attn: Tribal Chairman 7 Northern RD Presque Isle ME 04769 Penobscot Indian Nation Tribal Administration Attn: Tribal Chairman 12 Wabanaki Way Indian Island, ME 04468I Telephone (207) 827-7776 Fax (207) 817-7482 Houlton Band of Maliseet Attn: Tribal Chairman 88 Bell Road Littleton, ME 04730 Phone: (207) 532-4273 Passamaquoddy Tribe at Pleasant Point Attn: Tribal Chairman PO Box 343 Perry, ME 04667 207-853-2600 Passamaquoddy Tribe Donald Soctomah, THPO PO Box 159 Princeton, ME 04668 Tel: 207.796.2301 Fax: 207.853.6039 Email: soctomah@ainop.com Penobscot Nation Bonnie Newsom, THPO

406

Can we have our cake and eat it too? Can we support a decent standard of  

NLE Websites -- All DOE Office Websites (Extended Search)

Can we have our cake and eat it too? Can we support a decent standard of Can we have our cake and eat it too? Can we support a decent standard of living for the growing world population on a sustainable basis going forward? Speaker(s): Perry Sioshansi Date: October 26, 2009 (All day) Location: 90-3122 Global population is expected to top 9 billion by 2050 with growing numbers of people aspiring to achieve high standards of living now enjoyed by a minority in the rich countries. The question in this context is, "Can we support a decent standard of living for the growing world population on a sustainable basis going forward?" Answering this question requires (1) a definition of what constitutes a "decent" standard of living and (2) can the required energy services be sustainably supplied? The short answer is that incremental improvements in energy efficiency will not suffice -

407

DOE - Office of Legacy Management -- Reynolds Metals Co - VA 04  

Office of Legacy Management (LM)

Reynolds Metals Co - VA 04 Reynolds Metals Co - VA 04 FUSRAP Considered Sites Site: REYNOLDS METALS CO. (VA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.04-1 Location: 818 Perry Street , Richmond , Virginia VA.04-1 Evaluation Year: 1985 VA.04-2 VA.04-3 Site Operations: Preparatory process development involving only gram quantities of uranium performed in the 1950s. VA.04-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited materials handled VA.04-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.04-1 Radiological Survey(s): None Indicated VA.04-1 VA.04-4 Site Status: Eliminated from consideration under FUSRAP

408

DOE - Office of Legacy Management -- Mobil Oil Corp - VA 01  

Office of Legacy Management (LM)

Mobil Oil Corp - VA 01 Mobil Oil Corp - VA 01 FUSRAP Considered Sites Site: Mobil Oil Corp. (VA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.01-1 Location: 818 Perry Street , Richmond , Virginia VA.01-1 Evaluation Year: Circa 1987 VA.01-2 VA.01-3 Site Operations: Research/Development to recover Uranium as a byproduct of phosphate production; preparatory process for pilot plant scale operation at Nichols, Florida. VA.01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination from small quantities of material used at the site is considered remote VA.01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.01-1

409

Mr. Harry S. Cohen  

Office of Legacy Management (LM)

a50b a50b Mr. Harry S. Cohen 2956 Hathaway Road Apartment 1105 ' Richmond, Virginia 23225 Dear Mr. Cohen: ..:: The Department of Energy (DOE), as part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), has reviewed information on the former site of the Virginia-Carolina Chemical Corporation, located.at @I8 Perry Street in Richmond, Virginia, to determine whether It contains residual radioactivity traceable to activities conducted on behalf of the Manhattan Engineer District and the Atomic Energy Conar.ission (predecessors to DOE). Based on this review, DOE has concluded that there are no quantities of radioactive material above current guidelines remaining at the site. Therefore, no remedial action is required, and DOE is eliminating the site

410

Secretary of Energy Advisory Board Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the US Department of Energy (DOE) Secretary of Energy Advisory Board Public Meeting January 20, 2011 Committee Members: William Perry, Chair; Alexis Herman, Vice Chair; Ralph Cicerone; John Deutch; Nicholas Donofrio; Matt Rogers; Arthur Rosenfeld; Susan Tierney; Steven Westly; Daniel Yergin Date and Time: 9:00 AM- 4:00 PM, September 16, 2010 Location: US Department of Energy, 1000 Independence Avenue, SW, Room 1E-245 Washington, DC Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Amy Bodette, Designated Federal Officer DOE Staff: Steven Chu, Secretary of Energy; Daniel Poneman, Deputy Secretary; David Sandalow, Assistant Secretary for Policy and International Affairs; Bill Brinkman, Director, Office of Science; Karina Edmonds, Director, Tech Transfer

411

November 16, 2012 SEAB Meeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 16, 2012 SEAB Meeting November 16, 2012 SEAB Meeting November 16, 2012 SEAB Meeting November 22, 2013 - 2:52pm Addthis Secretary of Energy Advisory Board Meeting Agenda U.S. Department of Energy, Room 1E-245 1000 Independence Avenue SW Washington, DC November 16, 2012 8:00 am - 8:15 am Welcome & Overview Chairman William Perry Co-Chair Nicholas Donofrio 8:15 am - 8:45 am Public Comment on the Subcommittee Draft Reports 8:45 am - 9:30 am Small Modular Reactors Subcommittee Report and Committee Discussion (download) Nicholas Donofrio, Norm Augustine, Frances Beinecke 9:30 am - 10:15 am Buildings Subcommittee Report and Committee Discussion (download) Steve Westly, Michael McQuade, Matt Rogers, Art Rosenfeld (by phone) 10:15 am - 10:30 am Break 10:30 am - 11:15 am Report Discussion with Secretary Chu

412

Data:3bea7b54-9ad3-463f-ab83-f2baaa3558a4 | Open Energy Information  

Open Energy Info (EERE)

bea7b54-9ad3-463f-ab83-f2baaa3558a4 bea7b54-9ad3-463f-ab83-f2baaa3558a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 100W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

413

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 27440 of 28,904 results. 31 - 27440 of 28,904 results. Page American Indian Policy and Relevant DOE and Executive Orders Read about DOE's American Indian Policy, DOE Order 144.1, and Other Relevant DOE and Executive Orders. http://energy.gov/em/services/communication-engagement/em-tribal-programs-indian-country/american-indian-policy-and Page Dispute Resolution Information Alternative dispute resolution (ADR) is any technique for resolving disputes without resorting to litigation in either an administrative or judicial forum. http://energy.gov/oha/dispute-resolution-information Download Small Modular Reactor Report (SEAB) In his April 3, 2012, Memorandum to Secretary of Energy Advisory Board (SEAB) Chairman William Perry, Secretary of Energy Steven Chu charged: http://energy.gov/downloads/small-modular-reactor-report-seab

414

The State Energy Program Helps Promote that Bigger IS Better in Euclid,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The State Energy Program Helps Promote that Bigger IS Better in The State Energy Program Helps Promote that Bigger IS Better in Euclid, Ohio The State Energy Program Helps Promote that Bigger IS Better in Euclid, Ohio July 25, 2012 - 11:38am Addthis Compare how Lincoln Electric's wind tower -- the largest capacity wind turbine in Ohio -- measures up to well-known structures from around the world. | Graphic courtesy of Lincoln Electric. Compare how Lincoln Electric's wind tower -- the largest capacity wind turbine in Ohio -- measures up to well-known structures from around the world. | Graphic courtesy of Lincoln Electric. Perry Luksin Communication Specialist, Department of Energy State Energy Program What are the key facts? Lincoln Electric's wind tower measures 443 feet tall and can generate 2.5 MW of electrical energy.

415

Clean Energy Innovation: Sources of Technical and Commercial Breakthroughs  

NLE Websites -- All DOE Office Websites (Extended Search)

Innovation: Innovation: Sources of Technical and Commercial Breakthroughs Thomas D. Perry IV and Mackay Miller National Renewable Energy Laboratory Lee Fleming Harvard Business School Kenneth Younge University of Colorado James Newcomb National Renewable Energy Laboratory Current Affiliation: Rocky Mountain Institute Technical Report NREL/TP-6A20-50624 March 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Clean Energy Innovation: Sources of Technical and Commercial Breakthroughs

416

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85: EPA Notice of Availability of the Draft Environmental 85: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

417

4-17-12 SEAB Meeting Minutes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-17-12 SEAB Meeting Minutes -17-12 SEAB Meeting Minutes 4-17-12 SEAB Meeting Minutes Chairman Perry thanked the Secretary for his leadership and dedication to the Advisory Board. He noted the current Presidential term is coming to an end and with a new term, there could be changes to SEAB. He asked that the Committee keep this in mind and put all of its energy into making useful and complete recommendations by the end of this first term with the hope of carrying on the work over the next year. The Chairman noted a need for a summing up of what the Committee has done and what it is that can still be achieved to leave a legacy that the Committee, the Secretary, and the country can be proud of. The Chairman highlighted three areas he felt were important for the Committee to address and what the Committee had already done in these

418

Secretary of Energy Advisory Board Lawrence Livermore Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lawrence Livermore Laboratory Lawrence Livermore Laboratory October 12, 2011 Agenda Open Plenary Meeting Session 9:30 AM-9:45 AM Welcome and Overview Secretary Steven Chu and Dr. William Perry 9:45 AM-10:00 AM Director's Perspective George Miller, LLNL Director 10:00 AM-10:40 AM LLNL Progress Towards Ignition and Weapons Physics Experiments on NIF Bruce Goodwin and Ed Moses 10:40 AM-11:00 AM LLNL Strategy for Improvements in Cyber Security Jim Brase 11:00 AM-11:20 AM LLNL Computational Advances in Applied Energy Julio Friedman 11:20 AM-12:00 PM DOE in the Innovation Chain Secretary Chu 12:00 PM-1:30 PM Lunch Break 1:30 PM-1:45 PM Subcommittee Updates 1:45 PM-2:30 PM Blue Ribbon Commission Update

419

Proceedings of the March 25-26, 2009 Conference for the 2009 National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proceedings of the March 25-26, 2009 Conference for the 2009 Proceedings of the March 25-26, 2009 Conference for the 2009 National Electric Transmission Congestion Study - Session 1 Proceedings of the March 25-26, 2009 Conference for the 2009 National Electric Transmission Congestion Study - Session 1 A technical workshop on the 2009 National Electric Transmission Congestion Study was held on March 25-26, 2009 to receive input from subject matter experts on the historical transmission data and studies of future transmission projections in the Western and Eastern Interconnections. Session 1: Historic Congestion in the Western Interconnection Presentation by Wally Gibson, Northwest Power and Conservation Council_0.pdf Presentation by Dean Perry, Western Electricity Coordinating Council_0.pdf Presentation by Kurt Granat, PacifiCorp_0.pdf

420

Notice of Intent To Prepare an Environmental Impact Statement for Depleted Uranium Hexafluoride Conversion Facilities (DOE/EIS-0329) (9/18/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 23 Federal Register / Vol. 66, No. 181 / Tuesday, September 18, 2001 / Notices Section 615-Procedural Safeguards Topic Addressed: Due Process Hearings * Letter dated April 19, 2001 to Virginia Department of Education Director Judith A. Douglas, regarding whether a State educational agency is required to convene a due process hearing initiated by someone other than the parent of a child with a disability or a public agency. Topic Addressed: Surrogate Parents * Letter dated April 16, 2001 to Pinal County, Arizona Deputy County Attorney Linda L. Harant, regarding the appointment of surrogate parents for children who are wards of a tribal court. Topic Addressed: Student Discipline * Letter dated April 16, 2001 to Professor Perry A. Zirkel, regarding the calculation of disciplinary removals of

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Secretary of Energy Advisory Board Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Meeting Public Meeting July 20, 2011 Committee Members: William Perry, Chair; Frances Beinecke; Ralph Cicerone; John Deutch; Nicholas Donofrio; Chad Holliday; Michael McQuade; Matthew Rogers; Arthur Rosenfeld; Susan Tierney; Steven Westly; Daniel Yergin Date and Time: 4:00 PM- 5:20 PM, August 15, 2011 Location: Teleconference Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Amy Bodette, Designated Federal Officer Meeting Summary SEAB members convened by teleconference to discuss the 90 day interim report of the Natural Gas Subcommittee. The meeting began with 30 minutes of public comment. At the conclusion of the public comment session, John Deutch gave a brief overview of the report. SEAB members discussed the report and made recommendations.

422

Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the Summary Minutes of the U.S. Department of Energy (DOE) Secretary of Energy Advisory Board (SEAB) Public Meeting July 19, 2012 Committee Members: William Perry, Chair; Norm Augustine; Ralph Cicerone; Nick Donofrio; Michael McQuade; Matt Rogers; Art Rosenfeld; Sue Tierney; Steven Westly; Daniel Yergin Date and Time: 3:00PM - 4:30PM, July 19, 2012 Location: Teleconference Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Amy Bodette, Designated Federal Officer Alyssa Morrissey, Deputy Designated Federal Officer Meeting Summary SEAB Members convened by teleconference to hear updates from the Building Efficiency and Small Modular Reactor (SMR) Subcommittees. After the Subcommittee reports and questions from the full

423

Data:3d10ec32-c068-4540-89e0-3c1ade101c9a | Open Energy Information  

Open Energy Info (EERE)

ec32-c068-4540-89e0-3c1ade101c9a ec32-c068-4540-89e0-3c1ade101c9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Small Industrial Sector: Industrial Description: Small Industrial Energy Charge is the Commercial Electric Rate with a special minimum and choice of Demand Rate. This Small Industrial Energy Charge is for typical monthly use of less than 9,000 KWH. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

424

Data:8ee7fcc9-0bdb-4879-acc2-7a4eaff08e41 | Open Energy Information  

Open Energy Info (EERE)

ee7fcc9-0bdb-4879-acc2-7a4eaff08e41 ee7fcc9-0bdb-4879-acc2-7a4eaff08e41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- 175W Metal Halide Sector: Lighting Description: Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

425

ARM - Publications: Science Team Meeting Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Comparison of Aerosol Properties Within and Above the Atmospheric Boundary Comparison of Aerosol Properties Within and Above the Atmospheric Boundary Layer at the ARM SGP Site Delle Monache, L.(a), Perry, K.D.(a), and Cederwall, R.T.(b), San Jose State University (a), Lawrence Livermore National Laboratory (b) Twelfth Atmospheric Radiation Measurement (ARM) Science Team Meeting The objective of this work is to determine under what conditions, if any, measurements of aerosol properties made at the surface at the ARM SGP Central Facility are representative of aerosol properties within the column of air above the surface. This is important in assessing the value of data collected at the ARM Aerosol Observation System (AOS) for developing and diagnosing cloud and radiation parameterizations involving aerosol properties within and above the atmospheric boundary layer (ABL). The study

426

Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

28 results: 28 results: BibTex RIS RTF XML Sort by: Author Title Type [ Year (Desc) ] Filters: Author is Bernard Neenan [Clear All Filters] 2013 Cappers, Peter, Annika Todd, Michael Perry, Bernard Neenan, and Richard Boisvert. Quantifying the Impacts of Time-based Rates, Enabling Technology, and Other Treatments in Consumer Behavior Studies: Protocols and Guidelines., 2013. 2007 Goldman, Charles A., Nicole C. Hopper, Ranjit Bharvirkar, Bernard Neenan, and Peter Cappers. A Methodology for Estimating Large-Customer Demand Response Market Potential. Berkeley: LBNL, 2007. Goldman, Charles A., Nicole C. Hopper, Ranjit Bharvirkar, Bernard Neenan, and Peter Cappers. Estimating Demand Response Market Potential among Large Commercial and Industrial Customers: A Scoping Study. Berkeley: LBNL, 2007.

427

EIS-0385: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum Reserve Environmental Protection Agency Notice of Availability of Draft Environmental Impact Statements: Strategic Petroleum Reserve Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly, in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton, Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX DOE/EIS-0385, Draft Environmental Impact Statement for the Site Selection for the Expansion of the Strategic Petroleum Reserve

428

Flow Cells for Energy Storage Workshop Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Delivery Electricity Delivery & Energy Reliability Organized by: Energy Efficiency & Renewable Energy W i t h h e l p b y : Agenda Day/Time Speaker Subject Wednesday, March 07, 2012 8:45-9:00 Adam Weber, LBNL Welcome and workshop overview 9:00-9:30 Various, EERE, OFCT Background, approach, and reversible fuel cells 9:30-9:55 Michael Perry, UTRC Renaissance in flow cells: opportunities 9:55-10:20 Joe Eto, LBNL Energy storage requirements for the smart grid 10:20-10:35 AM Break 10:35-11:00 Robert Savinell, CWRU Revisiting flow-battery R&D 11:00-11:25 Stephen Clarke, Applied Intellectual Capital Lessons learned and yet to be learned from 20 years in RFB R&D 11:25-11:45 Imre Gyuk, DOE OE Research and deployment of stationary storage at DOE

429

The Committee met in Room 1E-246 of the Forrestal Building at  

U.S. Energy Information Administration (EIA) Indexed Site

MEETING MEETING + + + + + THURSDAY NOVEMBER 19, 1998 The Committee met in Room 1E-246 of the Forrestal Building at the Department of Energy, 1000 Independence Avenue, S.W., Washington, D.C., at 8:30 a.m., Daniel A. Relles, Chair, presiding. PRESENT: DANIEL A. RELLES Chair CAROL GOTWAY CRAWFORD Vice Chair DAVID R. BELLHOUSE CHARLES W. BISCHOFF JAY BREIDT R. SAMPRIT CHATTERJEE JAMES HAMMITT GRETA M. LJUNG POLLY A. PHIPPS SEYMOUR SUDMAN ALSO PRESENT: ERIN BOEDECKER STEPHEN CALOPEDIS LYNDA CARLSON SAM COHEN JOHN COLLIGAN CATHY DIPPO STAN FREEDMAN DWIGHT FRENCH JAY HAKES MARY HUTZLER W. CALVIN KILGORE PERRY LINDSTROM HERB MILLER RENEE MILLER BETSY O'BRIEN LARRY PETTIS ARTHUR RYPINSKI HANK SATTLETHIGHT JOHN SHERWELL BILL WEINIG C O N T E N T S PAGE Welcome 5

430

Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Minutes of the U.S. Department of Energy (DOE) Secretary of Energy Advisory Board (SEAB) Public Meeting November 14, 2011 Committee Members: William Perry, Chair; Norm Augustine; Ralph Cicerone; John Deutch, Nick Donofrio; Chad Holliday; Michael McQuade; Matt Rogers; Art Rosenfeld; Steven Westly Date and Time: 2:00PM - 2:45PM, November 14, 2011 Location: Teleconference Purpose: Meeting of the Secretary of Energy Advisory Board SEAB Staff: Alyssa Morrissey, Designated Federal Officer for the SEAB Committee Renee Stone, Designated Federal Officer for the Shale Gas Subcommittee Meeting Summary SEAB Members convened by teleconference to discuss the Second 90-Day Report of the Shale Gas Subcommittee. John Deutch gave an overview of the report, which was followed by a public comment

431

Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minutes of the Secretary of Energy Advisory Board Public Minutes of the Secretary of Energy Advisory Board Public Meeting on November 14, 2011 Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on November 14, 2011 SEAB Members convened by teleconference to discuss the Second 90-Day Report of the Shale Gas Subcommittee. John Deutch gave an overview of the report, which was followed by a public comment period. SEAB members discussed the report and came to an agreement that the report should be put forth to the Secretary with minor changes. Chairman Perry adjourned the Shale Gas Subcommittee, noting that its terms of reference had been met through the finalization of the report. 11.14.11_SEAB_Meeting_Minutes.pdf More Documents & Publications July 19, 2012 SEAB Minutes SEAB_Minutes_1_20_11.pdf

432

Integrated Safety Management (ISM) Workshop - November 28-30, 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

D - Developing Effective Safety Culture D - Developing Effective Safety Culture ISM Workshop Presentations November 28-30, 2007 Wednesday, November 28, 2007 11:00 - 12:30 Tank S-102 Waste Spill, Shirley Olinger, ORP and Jerry Long, CH2MHill Practices in Implementing Human Performance Initiative, Bill Hartley, BWXT Pantex 2:00 - 3:30 Safety Observation to Support Human Performance Improvement, Chris Contwell, Todd Conklin and John Tseng, LANL Human Performance Training and Job Aid for Nuclear Materials Applications, William Brown, BNL Developing Effective Safety Cultures, Dr. Isabel Perry 4:00 - 5:30 Commercial Nuclear Industry Progress on Safety Culture (Sensitive Material - Contact Presenter Directly), George Mortensen, INPO Communication with the Dead is only Slightly Harder than talking with an Engineer, William Rigot, WSRC

433

Microsoft PowerPoint - Day 2 - Thurs Plenary 1 - Vic Reis.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy, Nuclear Weapons and Climate Change: Energy, Nuclear Weapons and Climate Change: Options and Opportunities for the Next Administration Victor Reis Senior Advisor Department of Energy victor.reis@hq.doe.gov The role of the Department of Energy An interactive "work in progress" Your Picture Here Some of the Many Briefing (More or Less) Recipients Government Sam Bodman Arden Bement John Marburger Don Kerr Pete Domenici Jim Timbie Tony Tether Adm. Kirk Donald Former Government George Shultz Bill Perry Jim Schlesinger Sam Nunn Brent Scowcroft Bennett Johnston John Deutch Rich Mies Dick Meserve Jim Woolsey Academia Princeton MIT Harvard Texas U.C. Berkeley Vanderbilt Oregon State Stanford Cal Tech Utah (Law) Labs Argonne Oak Ridge Los Alamos Livermore Berkeley Sandia SLAC JPL(NASA) Organizations Naval Submarine League Stratcom SAG

434

Tribal Solar Energy Partnerships  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ENERGY PARTNERSHIPS SOLAR ENERGY PARTNERSHIPS Chairman Timothy Williams - Fort Mojave Indian Tribe Perry Fontana - First Solar Fort Mojave Indian Reservation Fort Mojave Project Site Mohave Generating Station (MGS) RESERVATION FARM LAND HISTORY * DOE funded renewable energy Feasibility Study found wind resource on Fort Mojave reservation marginal, but solar resource significant * Project was to be developed on 640 acres of Fort Mojave land in Arizona * Other parties included Tax and Equity financing entities, and solar developers (NEXT Light) * Group bid the project into the 2007 AZ and CA Utility PPA Request for Offers * Project was not shortlisted by any of the AZ or CA utility companies. * Fort Mojave made more land available in CA and partnered with NextLight to bid a

435

DOE Technical Conference - March 29, 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Poonum Agrawal Poonum Agrawal Office of Electricity Delivery and Energy Reliability US Department of Energy DOE Technical Conference March 29, 2006 2 DOE David Meyer Poonum Agrawal Lot Cooke, General Counsel Ellen Lutz Larry Mansueti Andrew Mclain, General Counsel David Neumeyer Julia Souder, Section 368 Coordination Western Congestion Assessment Task Force (WCATF) Rob Kondziolka, Salt River Project Doug Larson, WIEB Dean Perry, SSG-WI Jay Loock, WECC DOE 1221 Project Team CRA International Stephen Henderson Alex Rudkevich Ira Shavel Advisors Jim Byrne, Consultant Kurt Conger, Consultant Joe Eto, LBL Alison Silverstein, Consultant Robert Thomas, Cornell University Jim Whitehead, TVA Energetics Lauren Giles 3 Requires DOE to issue a national transmission congestion study by

436

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 9, 2011 June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 26, 2011 CX-005968: Categorical Exclusion Determination Holcomb Radio Station and Naselle Substation Communication Upgrade Project CX(s) Applied: B1.7 Date: 05/26/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration May 25, 2011 CX-005967: Categorical Exclusion Determination

437

ESH100.2.FP.1  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Procedure Title Manage Fire Protection Requirements Procedure Manager D'ANTONIO, PERRY E. Status Active Subject Matter Expert Laura D. Draelos Aden C. Jackson (CA) Applicability, Exceptions, and Consequences This corporate procedure applies to all Sandia National Laboratories (SNL) organizations, all management elements, all SNL sites, and all Members of the Workforce. Exceptions to, or deviations from, this procedure must be approved through the Executive Policy Sponsor or Policy Area Manager, if delegatedview Contacts for Corporate Policy System Policies, Processes, and Procedures. See CG100.1.7, Request an Exception to a Policy, Process, or Procedure, for directions on how to obtain an exception to this procedure. Granting or permitting exceptions or violations of policy, process, or

438

Microsoft PowerPoint - Soloveichik US-EU workshop 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G.Soloveichik 10/19/2010 Grigorii Soloveichik GE Global Research Trans-Atlantic Workshop on Storage Technologies for Power Grids Washington, DC, October 19-20, 2010 A Novel Concept for Energy Storage This work supported as part of the Center for Electrocatalysis, Transport Phenomena, and Materials for Innovative Energy Storage, an Energy Frontier Research Center funded by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences under Award Number DE-SC0001055 2 / G.Soloveichik 10/19/2010 Acknowledgements GE EFRC team P. Bonitatibus M. Doherty H. Lam L. Lewis T. Miebach R. Perry A. Peters J. Presley O. Siclovan D. Simone J. Stein A. Usyatinsky G. Yeager G. Zappi K. Zarnoch Yale team V. Batista R. Crabtree S. Konezny O. Luca T. Wang Stanford team C. Chidsey

439

Step-by-Step Instructions  

NLE Websites -- All DOE Office Websites (Extended Search)

Kentucky Kentucky based upon the simple prescriptive option of the 2012 IECC. It does not provide a guarantee for meeting the IECC. This guide is not designed to reflect the actual energy code, with amendments, if any, adopted in Kentucky and does not, therefore, provide a guarantee for meeting the state energy code. For details on the energy code adopted by Kentucky, including how it may differ from the IECC, please contact your local building code official. Additional copies of this guide are available on www.reca-codes.com. CLIMATE ZONE 4 Adair Edmonson Knox Nicholas Allen Elliott LaRue Ohio Anderson Estill Laurel Oldham Ballard Fayette Lawrence Owen Barren Fleming Lee Owsley Bath Floyd Leslie Pendleton Bell Franklin Letcher Perry Boone Fulton Lewis Pike

440

The Committee met at 8:55 a.m., in Conference Room 8E-089 in  

U.S. Energy Information Administration (EIA) Indexed Site

APRIL 14, 2000 + + + + + The Committee met at 8:55 a.m., in Conference Room 8E-089 in the Forrestal Building at 10th Street and Independence Avenue, S.W., Washington, D.C., Carol Gotway Crawford, Chair, presiding. MEMBERS PRESENT: CAROL A. GOTWAY CRAWFORD, Ph.D., Chair JAY BREIDT, Ph.D., Member THOMAS G. COWING, Ph.D., Member CALVIN A. KENT, Ph.D., Member W. DAVID MONTGOMERY, Ph.D., Member WILLIAM G. MOSS, Ph.D., Member POLLY A. PHIPPS, Ph.D., Member RANDY R. SITTER, Ph.D., Member ROY WHITMORE, ASA, Ph.D., Member PERRY M. LINDSTROM, EIA, Member GUESTS PRESENT: JOHNNY BLAIR, Ph.D. JOAN HEINKEL, Natural Gas Division MARY CARLSON, Natural Gas Division ANGIE KENT, Natural Gas Division KAREN FREEDMAN, National Energy Information Center GUESTS PRESENT: ANN DUCCA

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Engineering and Economic Assessment of Carbon Dioxide Sequestration in Saline Formations  

NLE Websites -- All DOE Office Websites (Extended Search)

and Economic Assessment of and Economic Assessment of Carbon Dioxide Sequestration in Saline Formations Lawrence A. Smith (smithla@battelle.org; 614-424-3169) Neeraj Gupta (gupta@battelle.org; 614-424-3820)* Bruce M. Sass and Thomas A. Bubenik Battelle Memorial Institute, 505 King Avenue, Columbus, OH 43201 *Corresponding Author Charles Byrer (a) and Perry Bergman (b) National Energy Technology Laboratory (a) P.O. Box 880, Morgantown, WV, 26507-0880 (b) P.O. Box 10940, Pittsburgh, PA, 15236-0940 ABSTRACT Concern over the potential effects of greenhouse gases such as carbon dioxide (CO 2 ) on global climate has triggered research about ways to mitigate the release of these gases to the atmosphere. A project to study the engineering feasibility and costs of sequestering CO

442

Data:4ea9b891-fb98-4604-bc44-c1d3cc3f739e | Open Energy Information  

Open Energy Info (EERE)

ea9b891-fb98-4604-bc44-c1d3cc3f739e ea9b891-fb98-4604-bc44-c1d3cc3f739e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Large Industrial Sector: Industrial Description: Large Industrial User: over 100,000 KWH monthly Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

443

Mananook Associates | Open Energy Information  

Open Energy Info (EERE)

Mananook Associates Mananook Associates Jump to: navigation, search Name Mananook Associates Address PO Box 69 Place Perry Zip 4667 Sector Marine and Hydrokinetic Phone number 207-733-5513 Region United States LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This company is listed in the Marine and Hydrokinetic Technology Database. This company is involved in the following MHK Projects: Grand Manan Channel Project This article is a stub. You can help OpenEI by expanding it. Retrieved from "http://en.openei.org/w/index.php?title=Mananook_Associates&oldid=678368" Categories: Clean Energy Organizations Companies Organizations Stubs MHK Companies What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load)

444

Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minutes of the Secretary of Energy Advisory Board Public Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 SEAB members heard opening remarks from Chairman Perry and Secretary Chu. Secretary Chu gave a presentation on DOE in the innovation chain. Following Secretary Chu's opening session was a "Director's Perspective" from George Miller, LLNL Director. Dr. Miller's presentation was followed by presentations from LLNL on the National Ignition Facility (NIF), cyber security, and computational advances in applied energy. Following the lab presentations, the Board heard updates from the Natural Gas Subcommittee and the Building Efficiency Subcommittee. The last session of the meeting

445

Chemistry in sport: context-based e-learning in chemistry  

E-Print Network (OSTI)

Abstract: This paper details the design and use of a learning resource for independent learning in chemistry. The course presents chemistry in the context of sport and draws upon a number of models of teaching and learning, including the Perry scheme of intellectual development, multiple intelligences (MI) theory, problem/context-based learning (P/CBL), mind mapping, case studies and web-based independent learning. The resource was produced as a website containing the context, content, and the tasks to be completed as part of the assessment. Hyperlinks to additional content and external web-pages were also included. The students response to the learning resource was positive; they enjoyed the course, found the context interesting and the presentation helpful. The assessment marks compared well with those from other modules taken by the same students in the same academic year. [Chem. Educ. Res. Pract., 2006, 7 (3), 195-202

Nicholas M. Potter; Tina L. Overton

2006-01-01T23:59:59.000Z

446

Magnetized black holes and black rings in the higher dimensional dilaton gravity  

E-Print Network (OSTI)

In this paper we consider magnetized black holes and black rings in the higher dimensional dilaton gravity. Our study is based on exact solutions generated by applying a Harrison transformation to known asymptotically flat black hole and black ring solutions in higher dimensional spacetimes. The explicit solutions include the magnetized version of the higher dimensional Schwarzschild-Tangherlini black holes, Myers-Perry black holes and five dimensional (dipole) black rings. The basic physical quantities of the magnetized objects are calculated. We also discuss some properties of the solutions and their thermodynamics. The ultrarelativistic limits of the magnetized solutions are briefly discussed and an explicit example is given for the $D$-dimensional magnetized Schwarzschild-Tangherlini black holes.

Stoytcho S. Yazadjiev

2005-11-21T23:59:59.000Z

447

Geothermal Energy Geopressure Subprogram, GCO-DOE, Pleasant Bayou No. 1  

DOE Green Energy (OSTI)

This Environmental Assessment (EA) has been prepared to assess the environmental implications of the Department of Energy's proposal to drill, complete, and test one geopressure well located in Brazoria County on a 2 hectares (five acre) test site 64 km (40 mi) south of Houston, Abstract 107, Perry and Austin Survey, Brazoria County, TX. The test well is herein referred to as GCO-DOE Pleasant Bayou No. 1. A maximum of four disposal wells will be located within .8 km (1/2 mi) of the proposed well. The DOE and the University of Texas Center for Energy Studies propose to operate the test facility for three years to evaluate the geopressure potential of the subsurface. Tests to be conducted include flow rates, fluid composition, temperature, gas content, geologic characteristics, and the land subsidence potential for subsequent production.

none

1978-03-01T23:59:59.000Z

448

W. E. Mott, Director,  

Office of Legacy Management (LM)

Department of Energy Department of Energy F&k i?z;;Operations dak Ridge, Tennessee 37830 W. E. Mott, Director, It is concluded that the potential for uranium contamination, even during the contract period, was small and that subsequent disposition of laboratory, furnishings and equipment further reduced that potential to the point where, it is felt, the need for further onsite investigation is not indicated. Hence, it is recommended that the reassessment of the site at 818 Perry Street, Richmond, Virginia, be terminated with this report. ti?LbL~ W. T. Thornton Environmental Protection Branch 0SE:WTT Safety & Environmental Control Division c d v76-2 Bo 7W -rwG 1 - ---_ -- -- Er-fl ,T - .,- L 4-------c 1 / 7, pi ' I ./7 * ---:;N-... __ P 2 (' - , . . dq/ ' j'

449

Mickey Leland Energy Fellowship | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mickey Leland Energy Fellowship Mickey Leland Energy Fellowship Mickey Leland Energy Fellowship November 26, 2012 11:45AM EST to January 18, 2013 6:45PM EST none Mickey Leland Energy Fellowship was initiated to increase opportunities for women and under-represented minorities who are pursuing degrees in STEM. During this 10 week summer program run by the Office of Fossil Energy, students will work at one of the Department's locations in focused research projects consistent with the Fossil Energy mission, and receive a paid stipend. At the conclusion of the internship, students attend a Technical Forum to present their research project and tour nearby technical sites. Applications for summer 2013 open on November 16 and close January 18. Contact Alan Perry U.S. Department of Energy Acting Director, FE-6

450

Categorical Exclusion Determinations: Montana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2011 June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 6, 2011 CX-005842: Categorical Exclusion Determination Anaconda Substation 3G Radio Upgrades CX(s) Applied: B1.19 Date: 05/06/2011 Location(s): Deer Lodge County, Montana Office(s): Bonneville Power Administration April 15, 2011 CX-005675: Categorical Exclusion Determination Fiscal Year 2011 Kalispell District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/15/2011 Location(s): Montana Office(s): Bonneville Power Administration March 29, 2011 CX-005529: Categorical Exclusion Determination

451

Double Decrement Approach  

NLE Websites -- All DOE Office Websites (Extended Search)

01E 01E Quantifying the Impacts of Time- based Rates, Enabling Technology, and Other Treatments in Consumer Behavior Studies: Protocols and Guidelines Peter Cappers, Annika Todd, Michael Perry, Bernie Neenan, and Richard Boisvert Environmental Energy Technologies Division July 2013 The work described in this report was co-funded by the Department of Energy's Office of Electricity Delivery and Energy Reliability's Smart Grid Investment Grant program, under Contract No. DE-AC02- 05CH11231, and the Electric Power Research Institute, Inc. (EPRI). The report was jointly written by Lawrence Berkeley National Laboratory and EPRI. ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Disclaimer This document was prepared as an account of work co-sponsored by the United States

452

Meeting Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Agenda Meeting Agenda Preliminary Agenda March 7, 2012 8:45-9:00 Adam Weber, LBNL Welcome and workshop overview 9:00-9:30 TBD, EERE, OFCT Background, approach, and reversible fuel cells 9:30-9:55 Michael Perry, UTRC Renaissance in flow cells: opportunities 9:55-10:20 Joe Eto, LBNL Energy storage requirements for the smart grid 10:20-10:35 Break 10:35-11:00 Robert Savinell, CWRU Revisiting flow-battery R&D 11:00-11:25 Stephen Clarke, Applied Intellectual Capital Lessons learned and yet to be learned from 20 years in RFB R&D 11:25-11:45 Imre Gyuk, DOE OE Research and deployment of stationary storage at DOE 11:45-12:05 Mark Johnson, DOE ARPA-E Flow cell research in GRIDS 12:05-12:30 Tom Zawodzinski, ORNL and UTK Transitioning fuel-cell technology to RFBs

453

GreenHunter Biodiesel Refinery Grand Opening | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer Today, Acting Deputy Secretary Jeffrey Kupfer delivered remarks at the launch of GreenHunter Energy's biodiesel refinery, which will be the nation's single largest biodiesel refinery, producing 105 million gallons of "white-water" B100 biodiesel per year. Thank you Gary. I'm pleased to join with Governor Perry, Congressmen Green and Lampson, and Mayor Garcia in celebrating this important occasion. Today, as we open the nation's largest biodiesel refinery, we reach another milestone in our effort to make America more energy secure. As you know, global energy demand is surging. We must act swiftly and aggressively to

454

US7711661.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

7711661B2 7711661B2 US 7,711,661 B2 May 4, 2010 (10) Patent N0.: (45) Date of Patent: (54) (75) (73) (*) (21) (22) (65) (63) (60) (51) (52) (58) SYSTEM AND METHOD FOR RESOLVING GAMMA-RAY SPECTRA Inventors: Charles A. Gentile, Plainsboro, NJ (US); Jason Perry, Princeton, NJ (US); Stephen W. Langish, Easthampton, NJ (US); Kenneth Silber, Hopewell, NJ (US); William M. Davis, East Windsor, NJ (US); Dana Mastrovito,Yardley, PA (Us) Assignee: The Trustees of Princeton University, Princeton, N] (U S) Notice: Subject to any disclaimer, the term of this patent is extended or adjusted under 35 U.S.C. 154(b) by 519 days. App1.No.: 11/743,421 Filed: May 2, 2007 Prior Publication Data US 2007/0294059 A1 Dec. 20, 2007 Related U.S. Application Data Continuation-in-part of application No. 11/017,215,

455

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 28580 of 28,904 results. 71 - 28580 of 28,904 results. Download CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005969-categorical-exclusion-determination Download CX-000604: Categorical Exclusion Determination Riverbend Balancing Authority Area Service Agreement (BAASA) CX(s) Applied: B4.1, B4.6 Date: 02/01/2010 Location(s): Yamhill, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000604-categorical-exclusion-determination Download CX-001830: Categorical Exclusion Determination YWCA Family Village at Issaquah

456

Portsmouth Site Delivers First Radioactive Waste Shipment to Disposal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Site Delivers First Radioactive Waste Shipment to Portsmouth Site Delivers First Radioactive Waste Shipment to Disposal Facility in Texas Portsmouth Site Delivers First Radioactive Waste Shipment to Disposal Facility in Texas August 27, 2013 - 12:00pm Addthis Waste management and transportation personnel worked late to complete the first shipment to WCS. Through a contract with DOE, WCS will treat and accept potentially hazardous waste that has been at the Portsmouth site for decades. Pictured (from left) are Scott Fraser, Joe Hawes, Craig Herrmann, Jim Book, John Lee, John Perry, Josh Knipp, Melissa Dunsieth, Randy Barr, Rick Williams, Janet Harris, Maureen Fischels, Cecil McCoy, Trent Eckert, Anthony Howard and Chris Ashley. Waste management and transportation personnel worked late to complete the

457

SECTION J, APPENDIX A - SOW  

National Nuclear Security Administration (NNSA)

be submitted 30 days prior to the desired start date. The Contractor shall submit a report of all such assignments, to include the total cost of each assignment, reason for...

458

PRODUCTION VERIFICATION TESTS  

Science Conference Proceedings (OSTI)

A summary of the demonstration of 14 stages (in 10 wells) of a unique liquid-free stimulation process which employs carbon dioxide (CO{sub 2}) as the working fluid in ten Candidate Wells. Three were situated in Perry County and seven in Pike County of eastern kentucky's Big Sandy gas field. These activities included four individual efforts which have previously been described in detail in four submitted Final Reports, and are herein summarized. These ten Candidate wells produce from the Devonian Shale which is well known to be damaged by liquid based stimulation processes. They were treated with a total of fourteen stages; four as a single stage, and the others in two stages per well all containing approximately 120 tons of CO{sub 2} per stage. These liquid free stimulations also contained proppant quantities on the order of 45,000 lbs per stage. The results show in the three Perry Co Candidate wells that the stimulations were not as effective as the best conventional technology, and resulted in a stimulation cost for produced gas of $0.69 per Mcf vs $0.43 for N{sub 2} gas stimulations. The results in the Pike County Candidates, where the shale section is thicker--1,025 vs. 350 feet, indicated a superior response from the wells stimulated with the CO{sub 2}/sand process. A five year production benefit of 67.7 MMcf per stage, or 135.4 MMcf per well over that from the closest competing technology which results in a 3.41 benefit ratio and a stimulation cost for produced gas of $0.47 per Mcf vs $1.14 for N{sub 2} gas.

Raymond L. Mazza

2003-09-30T23:59:59.000Z

459

Internships  

Environmental information ... The Industrial Partnerships Office seeks students with ... Interns for the Market Intelligence Group are assigned projec ...

460

Updated 1-12 Frederick E. Crecelius  

E-Print Network (OSTI)

to the Fleet and tenant commands. Upon commissioning and completion of flight training he was assigned to VRF

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Retail Unbundling - Massachusetts - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

DTE concluded that the upstream capacity market is not yet sufficiently competitive to change the current mandatory capacity assignment approach.

462

Retail Unbundling - Massachusetts  

U.S. Energy Information Administration (EIA)

DTE concluded that the upstream capacity market is not yet sufficiently competitive to change the current mandatory capacity assignment approach.

463

ABC D EFG H IJKL M NO P QR S T U VWXYZ  

Science Conference Proceedings (OSTI)

... file; Principal Component Analysis; Problems (and answers); Profile plots (intensity); Pseudo color: using sliders. RAE file format; RAM (memory, assign ...

464

GRASP WITH PATH RELINKING FOR THE THREE-INDEX ...  

E-Print Network (OSTI)

Feb 20, 2001 ... puter environment used to conduct the experiments, the instances ...... Computational investigations on 3-dimensional axial assignment.

465

NTRM Program  

Science Conference Proceedings (OSTI)

... NTRMs are produced and distributed by Specialty ... for warehousing and distributing the NTRMs ... value assignment, certificate generation and stability ...

2013-03-26T23:59:59.000Z

466

Updated 2-13 William G. Melton  

E-Print Network (OSTI)

Command. His next assignment was as the Deputy AC/S, G-2, III Marine Expeditionary Force in Okinawa, Japan

467

APART  

Energy Science and Technology Software Center (OSTI)

002662MLTPL00 Automated Pre-processing for NMR Assignments with Reduced Tedium http://sir.lanl.gov/APART.htm

468

Headquarters Awards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Awards Headquarters Awards Compensation EmploymentStaffing Recruitment Hiring Reform Overseas Assignment Human Capital Management Performance Management Documents...

469

Annual Security Report and Fire Safety Report 2011  

E-Print Network (OSTI)

to arrive at assigned times and dine within a 45-minute meal period. Please do not bring cooking appliances

470

BAMA COMPANIES Table of Contents and Figures List  

Science Conference Proceedings (OSTI)

... The Account Representative enters it into the database, where it then is assigned a management sponsor ... EMS Environmental Management System ...

471

BENEFIT HIGHLIGHTS BENEFIT ELIGIBILITY  

E-Print Network (OSTI)

No benefit payable under the Plan can be assigned, transferred or subject to any lien, garnishment, pledge

472

Development of a Mathematical Air-Leakage Model from Measured Data  

E-Print Network (OSTI)

Climate zonesbuilt, basement type, climate zone, etc. Geographical Datadata challenge was to assign climate zones (since we thought

McWilliams, Jennifer; Jung, Melanie

2006-01-01T23:59:59.000Z

473

Craig Sansonetti  

Science Conference Proceedings (OSTI)

... His activities include work with both classical spectrometers and with ... Purdue University Department of Physics, Research Associate, assigned to ...

2012-09-24T23:59:59.000Z

474

IIS6  

Science Conference Proceedings (OSTI)

... Configuration button >App Mappings tab, Rule Title ... Web Sites => => right click Properties ... defined by the 'User Rights Assignment' setting ...

2013-02-22T23:59:59.000Z

475

Cooperative Research & Development Agreement  

Science Conference Proceedings (OSTI)

... or any patent license or assignment ... relevant statutes, regulations and Presidential statements of ... approach sufficiently to permit your management ...

476

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

477

DOE O 135.1A, Budget Execution Funds Distribution and Control  

Directives, Delegations, and Requirements

The Order describes Department of Energy systems, requirements, and assignment of responsibilities for control of the Department budget execution process. ...

2006-01-09T23:59:59.000Z

478

DOE O 203.1, Limited Personal Use Of Government Office Equipment Including Information Technology  

Directives, Delegations, and Requirements

The Order establishes requirements and assigns responsibilities for employees' limited personal use of Government resources (office equipment and other ...

2005-01-07T23:59:59.000Z

479

Semidefinite Programming Based Approaches to Home-away ...  

E-Print Network (OSTI)

Mar 3, 2005 ... Semidefinite Programming Based Approaches to Home-away Assignment Problems in Sports Scheduling. Ayami Suzuka (asuzuka ***at***...

480

Exploring Virtual Network Selection Algorithms in DSM Cache Coherence Protocols  

E-Print Network (OSTI)

lines in the modified state. In a home-based directory protocol, every cache line is assigned a home

Heinrich, Mark

Note: This page contains sample records for the topic "davis-besse assigned perry" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Glossary  

Science Conference Proceedings (OSTI)

next up previous Next: Identifiers Up: No Title Previous: Setup. Glossary. between-subjects design. each subject is assigned ...

482

SF 6432-NI (02-22-10)  

interpreted in accordance with laws of New Mexico, and, where appropriate, the United States federal law. NI03 ASSIGNMENT

483

Optimal bandwidth utilization of all-optical ring with a converter of degree 4  

Science Conference Proceedings (OSTI)

In many models of all-optical routing, a set of communication paths in a network is given, and a wavelength is to be assigned to each path so that paths sharing an edge receive different wavelengths. The goal is to assign as few wavelengths as possible, ... Keywords: all-optical network, ring, wavelength assignment, wavelength translation

Xu Yinlong; Chen Guoliang; Huang Liusheng; Wan Yingyu

2002-07-01T23:59:59.000Z

484

SES CANDIDATE DEVELOPMENT PROGRAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Candidate Developmental Assignment Evaluation DATE:_______________ NAME OF SES CANDIDATE TITLE OF POSITION LOCATION ASSIGNMENT DURATION: Which Executive Core Qualification(s) was this assignment intended to meet? Leading Change Leading People Results Driven Business Acumen Building Coalitions/Communication Please provide a brief description of your assignment. Did the experience meet your expectation? Was this a good learning experience? 1 U.S. DEPARTMENT OF ENERGY DOE F 360.5 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Candidate Developmental Assignment Evaluation

485

SES CANDIDATE DEVELOPMENT PROGRAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Supervisor's Evaluation of Candidate's Performance During Developmental Assignment DATE:________________ NAME OF SES CANDIDATE: TITLE OF POSITION: LOCATION OF ASSIGNMENT: ASSIGNMENT DURATION: PART I: EVALUATION OF ASSIGNMENT OBJECTIVES Please evaluate the candidate's level of performance in meeting the objectives of the assignment as Successful or Unacceptable. Objectives Standards Performance Evaluation PLEASE RATE YOUR OVERALL EVALUATION OF THE CANDIDATE'S PERFORMANCE BY CIRCLING A NUMBER ON THE SCALE BELOW: EXCELLENT VERY GOOD SATISFACTORY POOR UNACCEPTABLE

486

Microsoft Word - Final Report 3-12-07.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy's Department of Energy's Management of Contractor Intergovernmental Personnel and Change of Station Assignments DOE/IG-0761 March 2007 Departmee~t of Energy \i\iashingron, GC 26555 Pbrch 26, 2007 MEMORANDUM FOR FROM: Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Management of Contractor Intergovernmental Personnel and Change of Station Assignments" BACKGROUND The Department of Energy's contractor-operated facilities use Intergovernn~ental Personnel Act ( P A ) and Change of Station (COS) assignments to permit contractor employees to work at other organizations. P A assignments are temporary transfers of personnel between the contractor and a Federal agency. Under COS assignments,

487

DOE`s multiprogram laboratories: The structure of an internal market  

SciTech Connect

Individual Department of Energy offices make R and D program assignments to competing multiprogram laboratories that are concentrated consistently more or less than the assignments of other offices over their full range, from largest assignment to smallest. Defense-related offices ignore as R and D performers the laboratories they do not dominate, by extends even greater than would be predicted from giving the three weapons laboratories their largest assignments. Certain DOE offices cluster their lab assignments together; others tend to avoid one another. To frame new legislation with net benefits for this internal market, Congress must appreciate the role of interlab competition.

Beggs, S.D. [Argonne National Lab., IL (United States). Energy Systems Div.

1996-04-15T23:59:59.000Z

488

User_LaunchSurvey  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Completing Assigned Survey and Completing Assigned Survey © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Launching and Completing Assigned Survey Purpose The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surveys. Task A. Launch and Complete Assigned Survey From the Home page, filter the To-Do List to show only Surveys. Hover over the course evaluation title. Click Open. 1 2 3 3 2 1 Launch and Complete Assigned Survey 6 Steps Task A SuccessFactors Learning v 6.4 User Job Aid Launching and Completing Assigned Survey © 2011 SuccessFactors, Inc. - 2 - SuccessFactors Learning Complete the survey by selecting the radio button for the appropriate rating

489

Audit Report: DOE-IG-0890 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE-IG-0890 DOE-IG-0890 Audit Report: DOE-IG-0890 July 2, 2013 Follow-up Audit on Term Assignments of Contractor Employees The Department of Energy frequently assigns facility contractor personnel to the Washington, DC, area on a temporary basis when program officials consider it necessary to obtain technical expertise not available locally. Commonly referred to as term assignments, the estimated cost of all such assignments for Fiscal Year (FY) 2012 was over $37 million, all of which was reimbursed by the Department. Federal officials authorizing such assignments are required to ensure that costs for assignees are reasonable when compared to other means of acquiring the necessary knowledge and experience. The Department's management of term assignments had improved since the 2005

490

Microsoft PowerPoint - Goddard-DOE brine-report-11-02-23.ppt...  

NLE Websites -- All DOE Office Websites (Extended Search)

the following assignment of the peaks: 19 Entropy, heat capacity and free energy over the phase diagram using 2PT molecular dynamics MATERIALS AND PROCESS SIMULATION CENTER, y...

491

DOE F 1500.7 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Employee Relocation Income Tax (RIT) Allowance Certification More Documents & Publications DOE F 1510.9 OPM Reservist Differential Briefing Handbook on Overseas Assignments...

492

View  

E-Print Network (OSTI)

and algorithms in this area, as well as several application areas where ...... solver reached assignment for proof timeout) found of SAT. Gap. 269. 51. 2. 20. 664.

493

2012 Safety System Oversight Annual Award Nominees - Kyle M....  

NLE Websites -- All DOE Office Websites (Extended Search)

Rankin is the mechanical systems Safety System Oversight Engineer (SSOE) assigned to the Department of Energy's Richland Operations Office (RL) Environmental Management program....

494

2012 Safety System Oversight Annual Award Nominees - Joseph L...  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Office of Health, Safety and Security Page 1 of 2 2012 Safety System Oversight Annual Award Nominee Assigned Facilities and Description of Duties Mr. Joseph...

495

Lawrence Livermore National Laboratory | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

contract, which oversees the lab. Additionally, the field office promotes national nuclear safety, executes assigned NNSA and Department of Energy programs and conducts...

496

February 9, 2004, Board Public Meeting Presentations ? DNFSB...  

NLE Websites -- All DOE Office Websites (Extended Search)

upon to accomplish the mission assigned to DOE and NNSA under the Atomic Energy Act of 1954, as amended. (Hereinafter collectively referred to as "DOE and NNSA's initiatives.")...

497

Browse wiki | Open Energy Information  

Open Energy Info (EERE)

shall have a monthly estimated usage assigned for billing purposes as follows: 46-watt LED lighting purposes as follows: 46-watt LED light OpenEIUtilityRate...

498

The website_judgements.csv file is a judgment file for the ...  

Science Conference Proceedings (OSTI)

... of judged profile-context pairs) -3 = Not judged (part of judged profile-context pairs, but no judgment assigned) -2 = Website didn't load at judgment ...

2013-03-13T23:59:59.000Z

499

Process Folder Tool  

Science Conference Proceedings (OSTI)

... pfldr text file This file lists the processing steps for the 'Process folder' command. Make it, then assign it. Make: Make boiler plate for the pfldr text file. ...

500

HSO Spotlight No 02 2012 Homeland Security Presidential Directive...  

NLE Websites -- All DOE Office Websites (Extended Search)

and those badges will need to be renewed. Appointment of HSPD-12 Renewal Officials: Each HQ element needs to assign Federal personnel within their organization as USAccess...