National Library of Energy BETA

Sample records for davis oak ridge

  1. OAK RIDGE

    Office of Legacy Management (LM)

    or _^ *ORNL/RASA-89/1 I : OAK RIDGE _NATIONAL LABORATORY |*H~~~~~ -~~Results of the I'I-------_____ ~ Preliminary Radiological * "~ i, .irri uSurvey at B&T Metals, _" 425 West Town Street, i * !' V Columbus, Ohio (C0001) I i. U Wo. 0aa-. r m ~~~~~~~~~ if? _ ~ W. D. Cottrell J. L Quillen J. W. Crutcher , I OPERATED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNL/RASA-89/1 3*1~~ ~HEALTH AND SAFETY RESEARCH DIVISION Waste Management Research and

  2. Oak Ridge Office

    Office of Environmental Management (EM)

    PO. Box 2001 Oak Ridge, Tennessee 37831 July 21, 2010 Mr. Ron Murphree, Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 1 Oak Ridge, Tennessee 3783 1 Dear Mr....

  3. Oak Ridge Office

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Ms. ... ON FISCAL YEAR 2014 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  4. Oak Ridge Office

    Office of Environmental Management (EM)

    Martin , Chair Oak Ridge Site Specific Advisory Board Post Office Box 200 I Oak Ridge, Tennessee 37831 Dear Mr. Martin : May 22, 2013 RESPONSE TO YOUR LETTER DATED MAY 9, 2013, RECOMMENDATION 216: RECOMMENDATIONS ON FISCAL YEAR 2015 DOE OAK RIDGE ENVIRONMENT AL MANAGEMENT BUDGET REQUEST Reference: Letter from David Martin to Mark Whitney, Recommendation 216: Recommendation on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request, dated May 9, 2013. I would like to express my

  5. Oak Ridge Office

    Office of Environmental Management (EM)

    I Oak Ridge, Tennessee 37831 Dear Mr. Martin : September 12, 2013 ru:SPONSE TO YOUR LETTER DATED .JUNE 13, 2013, RECOMMENDATION 217: RECOMMENDATION ON STEWARDSHIP POINT OF CONT ACT FOR THE OAK RIDGE RESERVATION Reference: June 13 , 2013, Letter from David Martin to Susan Cange, Recommendation 217: Recommendation on Stewardship Point of Contact for the Oak Ridge Reservation. We appreciate the recommendation provided by the Oak Ridge Site Specific Advisory Board regard in g having a dedicated

  6. Oak Ridge Associated

    Office of Legacy Management (LM)

    ])\D Oak Ridge ,.(\\~ Associated ru~ Universities Post Office Box 11 7 Oak Ridge, Tennessee 37831-0117 October 21, 1986 Manpower Education, Research, and Training Division Mr. Edward G. Delaney, Director Division of Facility and Site Decommissioning Projects Office of Nuclear Energy U.S. Department of Energy Washington, DC 20545 Subject: VERIFICATION OF NIAGARA FALLS STORAGE SITE VICINITY PROPERTIES - 1983/1984 REMEDIAL ACTIONS Dear Mr. Delaney: Oak Ridge Associated Universities <ORAU) has

  7. Manager, Oak Ridge Office

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will provide overall executive leadership to and integration of the Oak Ridge Integrated Support Center, which houses mission critical activities and support...

  8. Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Oak Ridge Oak Ridge's compliance agreements - which help support the development of effective compliance approaches and strategies - are listed below. Summaries of the agreements also are included. Oak Ridge Reservation Compliance Order, September 26, 1995 (164.23 KB) Oak Ridge Reservation Compliance Order, September 26, 1995 Summary (40.23 KB) Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992 (1.92 MB) Federal Facility Agreement for the Oak Ridge Reservation,

  9. Oak Ridge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P.O. Box 2001 Oak Ridge, Tennessee 37831 - August 28, 2008 Oak Ridge Associated Universities Attn : Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A050 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $25,539,179.05, resulting in total obligations to this contract of $541 ,282,961.6 1. If you have any queslions regarding this action, you may

  10. Oak Ridge Reservation Needs Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Needs Assessment for former Oak Ridge National Laboratory and Y-12 Nuclear Security Complex production workers.

  11. An Oak Ridge baseball team | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    An Oak Ridge baseball team An Oak Ridge baseball team An Oak Ridge baseball team

  12. Oak Ridge Associated Universities Procurement Questionnaire Application

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  13. Oak Ridge O

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Forum & Expo | Department of Energy Oak Ridge National Laboratory Wins DOE Mentor of the Year Award at Small Business Forum & Expo Oak Ridge National Laboratory Wins DOE Mentor of the Year Award at Small Business Forum & Expo October 10, 2014 - 10:30am Addthis Leanne Stribley (center), with Sonny Rogers and Cassandra Stuart, of ORNL, accepts the DOE Mentor of the Year Award from Kevin Knobloch, DOE Chief of Staff, and John Hale III, Director of DOE's Office of Small and

  14. Oak Ridge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R231 00, MODIFICATION A049 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $14,265 ,839.77, resulting in total obligations to this contract of $515,743,782 .56 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  15. Oak Ridge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 30, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge , Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A051 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $32,445,437.04, resulting in total obligations to this contract of $573,728,398.65. If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  16. Oak Ridge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 1, 2008 Oak Ridge Associated Universities Attn: Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A052 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $1,231,037.73, resulting in total obligations to this contract of $574,959,436.38 . If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  17. Oak Ridge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 31, 2008 Oak Ridge Associated Universities Attn : Mr. Ivan Boatner, General Counsel P.O. Box 117 Oak Ridge, Tennessee 37831 Dear Mr. Boatner: SUBJECT: CONTRACT NO. DE-AC05-060R23100, MODIFICATION A054 Enclosed is one fully executed copy of the subject document. This modification obligates the sum of $10,799,1 39.34, resulting in total obligations to this contract of $585,758,575.72. If you have any questions regarding this action, you may contact me at 576-0757 or via e-mail at

  18. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  19. cityOakRidgeWeb

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 miles 1 12 HIGH SCHOOL Oak Ridge Playhouse Methodist Medical Center CIVIC CENTER Art Ctr. Oak Ridge Associated Universities (ORAU) Hampton Inn DoubleTree Hotel Days Inn MUSEUM OF SCIENCE AND ENERGY Y-12 NATIONAL SECURITY COMPLEX Oak Ridge Mall Jameson Inn Numbered and unnumbered tra c lights Staybridge Suites Comfort Inn Commerce Park Jack Case Center New Hope Center Y-12 Visitor Center Children 's Museum OFFICE OF SCIENTIFIC & TECHNICAL INFORMATION Oak Ridge Marina Centennial Golf Course

  20. Oak Ridge Manufacturing Demonstration Facility (MDF) | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Oak Ridge Manufacturing Demonstration Facility (MDF) Oak Ridge Manufacturing Demonstration Facility (MDF) The Manufacturing Demonstration Facility (MDF) is a ...

  1. Oak Ridge Associated Llniversities

    Office of Legacy Management (LM)

    ii!fil Prepared by Oak Ridge Associated Llniversities Prepared for U.S. Nuclear Regulatory Commission's Region I Office Supported by Safeguards dnd Materials Program Branch; Division of Quality Assurance, Safeguards, and Inspection Programs; Off ice of Inspection and r Enforcement I - CONFIRMATORY RADIOLOGICAL SURVEYS OF BUILDING 10 AND OUTSIDE AREAS ASSOCIATED WITH BUILDINGS 7 AND 8 WESTINGHOUSE NUCLEAR FUEL DIVISION CHESWICK, PENNSYLVANIA A. J. BOERNER Radiological Site Assessment Program

  2. Oak Ridge Operations PO. Box E

    Office of Legacy Management (LM)

    PO. Box E Oak Ridge,Tennessee 37830 E. 6. DeLaney, DRAP, NE-24 COMPLETION OF DECONTAMINATION OF GILMAN HALL, UNIVERSITY OF CALIFORNIA AT BERKELEY Attached is a copy of the final report covering the remedial actions and associated radiological survey work on Gilman Hall. Your attention is called to the last paragraph of the attached letter from Mr. Davis (SAN) which states: "Completion of this work has fulfilled OR's obligation under the Formerly Utilized Sites Remedial Action Program

  3. OakRidge-cert-OPEIU 1981.pdf

    Office of Environmental Management (EM)

    Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge

  4. Oak Ridge Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Site Oak Ridge Site Demolition progress at Oak Ridge Demolition progress at Oak Ridge Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Recovery Act workers at Alpha 5 at the Y-12 National Security Complex at Oak Ridge, Tenn., survey waste as part of the characterization process to determine its proper disposition path Demolition progress at Oak Ridge

  5. Oak Ridge EM Program DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    DOE establishes the Oak Ridge Site Specifc Advisory Board (ORSSAB) under the Federal ... Reuse Organization of East Tennessee (a DOE leasing agent) and a private company. ...

  6. DOE Oak Ridge Operations managers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    weapons production, and basic scientific research. Additional responsibilities have been placed on the federal offices in Oak Ridge during the years. It can be said, if the...

  7. Oak Ridge ARI Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset revitalization initiative in Oak Ridge, TN. Oakridge_Fact_Sheet.pdf (382.48 KB) More Documents & Publications ARI Quarterly Newsletter Oak Ridge ARI Overview ARI: Creating a 2020 DOE Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets

  8. OAK RIDGE NATIONAL LABORATORY

    Office of Legacy Management (LM)

    POST OFFICE 80X 2008 OAK RIDGE, TENNESSEE 37831 MANAGED BY MARTIN MARlElTA ENERGY SYSTEMS. INC. FOR THE U.S. DEPARTMENT OF ENERGY July 15, 1992 Dr. W. A Williams Department of Energy Trevion II Building EM-421 Washington, D. C. 20585 Dear Dr. Williams: Trip Report of ORNL Health Physics Support at the Uniroyal Chemical Company Painesvik, Ohio, on June 25,1992 As per agreement between DOE-HQ and Uniroyal of Painesville, on June 25, 1992, a member, the undersigned, from the Health and Safety

  9. Oak Ridge Associated

    Office of Legacy Management (LM)

    2012 IL.06 *128 Oak Ridge Associated Post Of/ICE: 80 '17 Unl e Sllles Oa d. )Cp€ T nness £: 37 1 *01 '7 '-1.\0.-»"--" 10. June 14, 1989 Mr. Andrew Wallo ruSRAP/Surplus Facilities Group Division of Facili y & Site Decommissioning Projects Office of Nuclear Energy U.S. D~partment of Energy Washington, D.C. 20545 Subject: LETTER REPORT - VERIFIC~TION ACTIVITIES AT UNIVERSITY OF CHICAGO Dear Mr. Wallo: Enclosed is the report for the recent ORAU verification activities involving

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ... * Internet: www.oakridge.doe.govemssab Oak Ridge Site ... and maintenance budget, funding, and personnel ...

  11. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  12. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Savers [EERE]

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  13. Oak Ridge Associ Universities

    Office of Legacy Management (LM)

    ir.\ "'t-"' , i 'Prepared by Oak Ridge Associ Universities Prepared for Division of Remedial Action Proiects 'U.S. Department of Energy 5 : ! l :;"i\ r l!! ,iri$, t . r ' i , , . 1 . E".:r- i{$, i. 'ii idi 1, . :{. I i:li C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F - S I T E P R O P E R T Y W N I A G A R A F A L L S S T O R A G E S I T E LEWlsToN, NEW YORK J . D . B E R G E R Radiol-oglcal Site Assessment Program Manpower Education, Research, and

  14. Oak Ridge Associated

    Office of Legacy Management (LM)

    l/s1 Prepared by Oak Ridge Associated 'Universities Prepared for Division of Remedial Action Froiects ilJ..S. Department of Energy N( , /7 C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F . S I T E P R O P E R T Y F N I A G A R A F A L L S S T O R A G E S I T E L E W I S T O N , N E W Y O R K J. D. BERGER Radiologieal Site Assessment Program . Manpower Education, Research, and Training Division FINAL REPORT February 1984 COMPREHENSIVE RADIOLOGICAI SURVEY OFF-SITE PROPERTY F

  15. Oak Ridge Universities

    Office of Legacy Management (LM)

    Oak Ridge Universities Prepared for Division of Remedial Action Projects U.S. Department of Energy C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F - S I T E P R O P E R T Y X N I A G A R A F A L L S S T O R A G E S I T E L E W l s T o N , N E W Y O R K J . D . B E R G E R R a d i o l o g i c a l M a n p o w e r E d u c a t i o n ' Site Assessment Program Research, and Training Division FINA], May REPORT 1 9 8 4 COMPREHENSIVE MDIOLOGICAI SURVEY OFF-SITE PROPERTY X NIAGARA

  16. Oak Ridge shoppers | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    shoppers Oak Ridge shoppers Oak Ridge shoppers in a crowded grocery store

  17. Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office Oak Ridge Office Document Management Ststem(HummingbirdDM) PIA, Oak Ridge Operations Office (78.91 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA,

  18. Oak Ridge National Laboratory Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE)

    This fact sheet provides an update on all of the current cleanup projects at the site, and it also lists the major projects that were completed at the Oak Ridge National Laboratory.

  19. Deputy Secretary visits Oak Ridge

    Broader source: Energy.gov [DOE]

    As Deputy Secretary Sherwood-Randall traveled across the Oak Ridge Reservation, she stopped at the East Tennessee Technology Park for a first-hand perspective of the environmental cleanup happening there.

  20. Oak Ridge OPEIU 2001 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge OPEIU 2001 Oak Ridge OPEIU 2001 Oak Ridge OPEIU 2001 The Oak Ridge Office of Environmental Management is a U.S. Department of Energy (DOE) field site located in Oak Ridge, TN. The site dates back to 1942 as part of the Manhattan Project. Engineers developed three distinct campuses within the Oak Ridge Reservation, and each pursued a different technology to enrich uranium. In the decades since, each of these campuses the Oak Ridge National Laboratory (ORNL), Y-12 National Security

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    3, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 217: Recommendation on Stewardship Point of Contact for the Oak Ridge Reservation The Oak Ridge Site Specific Advisory Board (ORSSAB) Stewardship Committee believes it is important for the Department of Energy Oak Ridge Environmental Management (EM) Program to have a dedicated point of contact that the committee and the full board can go to

  2. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory (ORNL) conducts research and development to create scientific knowledge and solutions that strengthen the nation's leadership in key areas of science; increase the availability of clean, abundant energy; restore and protect the environment; and contribute to national security. ORNL also performs

  3. Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory Oak Ridge National Laboratory An aerial view of the Oak Ridge National Laboratory campus. An aerial view of the Oak Ridge National Laboratory campus. The U.S. Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) is the nation's largest multi-program science and technology laboratory. ORNL's mission is to deliver scientific discoveries and technical breakthroughs that will accelerate the development and deployment of solutions in clean energy and global

  4. Oak Ridge Construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    System Supplier Profile PIA, Oak ridge Operations Office | Department of Energy Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities Procurement Questionnaire Application System Supplier Profile PIA, Oak ridge Operations Office Oak Ridge Associated Universities

  5. Recommendation 208 : Use White Paper on Oak Ridge Reservation...

    Office of Environmental Management (EM)

    8 : Use White Paper on Oak Ridge Reservation Recommendation 208 : Use White Paper on Oak Ridge Reservation The ORSSAB approved the enclosed recommendation suggesting DOE Oak Ridge...

  6. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  7. The Oak Ridge Reservation

    Broader source: Energy.gov (indexed) [DOE]

    Ridge Operations site on the world wide web: ornl.govdoeoroememhome.html or by ... room, a neighborhood library, a local oversight board's archives, or an Internet web site. ...

  8. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 9, 2013 Susan Cange Deputy Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 215:...

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Ms. Cange: Recommendation 228: Recommendation on Fiscal Year 2017 DOE Oak Ridge Environmental Management Budget Request At our June 10, ...

  10. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    on Fiscal Year 2016 DOE Oak Ridge Environmental Management Budget Request At our May 14, 2014, ... Advisory Board * P.O. Box 2001, EM-91, Oak Ridge, TN 37831 ...

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. Whitney: Recommendation 216: Recommendations on Fiscal Year 2015 DOE Oak Ridge Environmental Management Budget Request At our May 8, ...

  12. Early Oak Ridge Trailer Home | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Early Oak Ridge Trailer Home A typical trailer home

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    March 14, 2008 Mr. Steve McCracken Assistant Manager for Environmental Management DOE-Oak Ridge Office P.O. Box 2001, EM-90 Oak Ridge, TN 37831 Dear Mr. McCracken: Recommendation 165: Recommendation on Conducting Future Verifications of Cleanup At our March 12 meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendation. The successes of independent verification of cleanup on the Oak Ridge Reservation, the David Witherspoon Site in Knoxville, and at many other sites

  14. Oak Ridge Site Specific Advisory Board Meetings

    Broader source: Energy.gov [DOE]

    Lists links to the Oak Ridge Site Specific Advisory Board Meetings. The links provide meeting documents available for download.

  15. Independent Oversight Review, Oak Ridge Office- August 2011

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  16. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  17. DOE Names Oak Ridge Cleanup Manager

    Broader source: Energy.gov [DOE]

    Oak Ridge, Tenn. – The U.S. Department of Energy (DOE) announced today the selection of Sue Cange as the manager of the Oak Ridge Office of Environmental Management (EM). Previously, Cange served as the acting manager of EM’s Oak Ridge Office since May 2014, and she has served as the deputy manager since March 2011.

  18. Oak Ridge Operations

    Office of Legacy Management (LM)

    Ridge. Tennessee 37831- 8723 October 6, 1993 Ms. Susan Zacker State H i s t o r i c Preservation O f f i c e - - Pennsylvania H i s t o r i c a l and Museum Cornmi ssion P.O. Box...

  19. Oak Ridge National Laboratory Review

    SciTech Connect (OSTI)

    Krause, C.; Pearce, J.; Zucker, A.

    1992-01-01

    This report presents brief descriptions of the following programs at Oak Ridge National Laboratory: The effects of pollution and climate change on forests; automation to improve the safety and efficiency of rearming battle tanks; new technologies for DNA sequencing; ORNL probes the human genome; ORNL as a supercomputer research center; paving the way to superconcrete made with polystyrene; a new look at supercritical water used in waste treatment; and small mammals as environmental monitors.

  20. Small Business Administration Honors Oak Ridge Subcontractor

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – The U.S. Small Business Administration (SBA) recently honored an environmental cleanup company that supports Oak Ridge’s EM program as its Subcontractor of the Year in an eight-state region.

  1. Oak%20Ridge.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information Oak%20Ridge

  2. EA-1044: Melton Valley Storage Tanks Capacity Increase Project- Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to construct and maintain additional storage capacity at the U.S. Department of Energy's Oak Ridge National Laboratory, Oak Ridge,...

  3. Independent Oversight Inspection, Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    8 Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920 This report provides the results of an inspection of...

  4. Oak Ridge Centers for Manufacturing Technology ? testimonials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    testimonials The first testimonial for the successful Oak Ridge Centers for Manufacturing Technology came from Mitchell Burnett. Mitch was among the first hourly paid employees, an...

  5. Oak Ridge Centers for Manufacturing Technology - Partnership...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact on the Semiconductor Industry, part 2 The Oak Ridge Centers for Manufacturing Technology in partnership with SEMATECH (Semiconductor Manufacturing TECHnology) had...

  6. Oak Ridge Centers for Manufacturing Technology - Partnership...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with some of the people who experienced the Oak Ridge Centers for Manufacturing Technology firsthand. Here is his introduction followed by the first of three letters...

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    4 Annual Meeting Oak Ridge Site Specific Advisory Board Saturday, August 16, 2014, 8 a.m. to noon DOE Information Center, 1 Science.gov Way Oak Ridge, Tenn. The Oak Ridge Site Specific Advisory Board (ORSSAB) met for its annual planning meeting beginning at 8 a.m., on Saturday, August 16, 2014, at the Department of Energy (DOE) Information Center, 1 Science.gov Way, Oak Ridge, Tenn. The objectives of the meeting were to: * Develop an increased understanding of and commitment to the goals of the

  8. Oak Ridge National Laboratory | Open Energy Information

    Open Energy Info (EERE)

    Tool 4 References 4.1 References Overview "Oak Ridge National Laboratory (ORNL) is a science and technology laboratory managed for the United States Department of Energy by...

  9. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    February 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  10. Oak Ridge Site Specific Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expedite Milestones C. Recommendation on DOE Oak Ridge GIS Fact Sheets (C. Staley) D. Election of FY 2015 Board Officers (B. Price) VII. Responses to Recommendations & Comments (D. ...

  11. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 13, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ......

  12. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    January 14, 2015, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright) ......

  13. Oak Ridge - A Center of Innovation & Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Energy property at the East Tennessee Technology Park (ETTP) and the Oak Ridge Science & Technology Park. CROET's award-winning program to revitalize former DOE...

  14. Leadership Oak Ridge visits Y-12 | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Leadership Oak Ridge visits Y-12 NNSA Blog The 2015 Leadership Oak Ridge class recently ... The 2015 Leadership Oak Ridge class recently visited the Y-12 National Security Complex. ...

  15. Oak Ridge EM Program Collaborates with Regulators on Groundwater Strategy

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – The Oak Ridge EM program has joined state and federal regulators in a series of workshops to address contaminated groundwater on the Oak Ridge Reservation.

  16. Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request ...

    Office of Environmental Management (EM)

    6: FY 2015 DOE Oak Ridge EM Budget Request Recommendation 216: FY 2015 DOE Oak Ridge EM Budget Request At the May 8, 2013, meeting, the Oak Ridge Site Specific Advisory Board ...

  17. Trailer homes in Oak Ridge | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Traffic Safety Traffic Safety Addthis Description Traffic safety promotion video

    Trailer homes in Oak Ridge Trailer homes in Oak Ridge An aerial of Oak Ridge showing the extensive use of trailer homes

  18. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Environmental Management (EM)

    Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge ... 2013 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. ...

  19. Oak Ridge Office of Environmental Management

    Broader source: Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  20. ITER movie created by Oak Ridge National Laboratory, National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITER movie created by Oak Ridge National Laboratory, National Center for Computational Sciences American Fusion News Category: U.S. ITER Link: ITER movie created by Oak Ridge ...

  1. FTCP Site Specific Information - Nuclear Energy Oak Ridge Site...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Energy Oak Ridge Site Office FTCP Site Specific Information - Nuclear Energy Oak Ridge Site Office Annual Workforce Analysis and Staffing Plan Report Calendar Year 2013...

  2. Oak Ridge Site Specific Advisory Board Committees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committees Oak Ridge Site Specific Advisory Board Committees Oak Ridge's Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its...

  3. PIA - Oak Ridge Institute for Science and Education Program Applicant...

    Office of Environmental Management (EM)

    Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and ...

  4. OAK RIDGE CERCLA DISPOSAL FACILITY ACHIEVES SAFETY MILESTONE

    Broader source: Energy.gov [DOE]

    Oak Ridge, TN - The Environmental Management Waste Management Facility (EMWMF) provides the onsite disposal capability for the majority of cleanup-generated wastes on the Oak Ridge Reservation....

  5. Energy Department, Oak Ridge National Lab Officials to Celebrate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory Director Thom Mason, Governor Bill Haslam and ... Dr. Thom Mason, Oak Ridge National Laboratory Director Industry representatives, including ...

  6. Turtle Search Highlights Oak Ridge's Support to Environmental...

    Office of Environmental Management (EM)

    Turtle Search Highlights Oak Ridge's Support to Environmental Education Initiative Turtle Search Highlights Oak Ridge's Support to Environmental Education Initiative July 14, 2016 ...

  7. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Institute for Science and Education - January 2015 January 2015 ... of Oak Ridge Institute for Science and Education (ORISE) during the period of January ...

  8. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Science and Education - October 2011 October 2011 Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing ...

  9. Voluntary Protection Program Onsite Review, Oak Ridge Associated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Science and Education - April 2008 Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities Oak Ridge Institute for Science and Education - April 2008 ...

  10. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornlttpreportfy08.pdf (4.58 ...

  11. Evaluation of Side Stream Filtration Technology at Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Document provides ...

  12. Former Oak Ridge Bechtel Jacobs Employee Charged with Violating...

    Office of Environmental Management (EM)

    Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of ...

  13. Transuranic Waste Processing Center Oak Ridge Site Specific...

    Office of Environmental Management (EM)

    Transuranic Waste Processing Update Oak Ridge Site Specific Advisory Board May 14, 2014 ...EM 3 Oak Ridge Transuranic (TRU) Waste Inventory * TRU waste is waste ...

  14. John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    John Hsu, Oak Ridge National Laboratory, Flux Coupling Machines and Switched Reluctance Motors to Replace Permanent Magnets in Electric Vehicles John Hsu, Oak Ridge National...

  15. Human Resources at Oak Ridge National Laboratory | Critical Materials...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oak Ridge National Laboratory Contact Information The main contact for human resources for CMI at Oak Ridge National Laboratory: David Lett Phone: 865-576-5675 Email: ...

  16. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- October 2011

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education is continuing to perform at a level deserving DOE-VPP Star recognition.

  17. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  18. Independent Oversight Inspection, Oak Ridge National Laboratory- October 2008

    Broader source: Energy.gov [DOE]

    Inspection of Nuclear Safety at the Oak Ridge National Laboratory Radiochemical Engineering Development Center, Building 7920

  19. Oak Ridge Facilities Construction | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

    Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities

  20. Early Oak Ridge Home | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Early Oak Ridge Home A typical dwelling predating the Manhattan Project homes

  1. Early Oak Ridge Trailer Homes | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Early Oak Ridge Trailer Homes A row of trailer homes used

  2. Enforcement Letter, Oak Ridge National Laboratory- May 31, 2002

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge National Laboratory

  3. Michelle Buchanan > Oak Ridge National Laboratory > Scientific Advisory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Board > The Energy Materials Center at Cornell Michelle Buchanan Oak Ridge National Laboratory

  4. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  5. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    migration studies. These recommendations were the result of the Groundwater Strategy Document for the Oak Ridge Reservation (DOEOR01-2628V1&V2D1) that was developed...

  6. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Specific Advisory Board Wednesday, March 12, 2014, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (D. Hemelright)...

  7. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    A. EMStewardship (B. Hatcher, C. Staley) B. Executive (D. Hemelright) 1. Public Outreach-Earth Day Festival (M. Smalling) 2. Center for Oak Ridge Oral History (C. Staley) IX....

  8. Oak Ridge Visitors Center Solar Array

    Broader source: Energy.gov [DOE]

    This photograph features a 5-kilowatt photovoltaic (PV) system in front of the Oak Ridge National Laboratory Visitors Center that was dedicated in 2007 to kick off the first Southeast Solar Summit....

  9. AEC and Oak Ridge High School

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    what happened. The Atomic Energy Commission spent 3,000,000 to build a new state- of-the-art high school in Oak Ridge in a very central and special location. This was done at a...

  10. Contractor Fee Payments- Oak Ridge Operations

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts.  

  11. Energy Secretary Steven Chu Visits Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Visits Oak Ridge Energy Secretary Steven Chu Visits Oak Ridge March 23, 2010 - 12:00am Addthis OAK RIDGE, TN - At an event earlier this afternoon at Oak Ridge National Laboratory, U.S. Energy Secretary Steven Chu announced that DOE has issued a five-year extension to its current management and operating contractor, UT-Battelle, LLC, for the continued operation of the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. While at Oak Ridge, Secretary Chu also met with staff from the

  12. Michael Starke, Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Starke, Oak Ridge National Laboratory starkemr@ornl.gov Team: Sachin Nimbalkar, Brandon Johnson Oak Ridge National Laboratory Prashant More, Carlos Silva ENBALA Power Networks Anna Shipley SRA September 17, 2014 Berkeley, CA DOE/OE Transmission Reliability R&D Load as a Resource (LaaR) Objectives * ORNL is examining potential for manufacturing processes to provide regulation service. This includes: ▪ Conducting modeling analysis (more detailed understanding on impact of industrial

  13. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    30: Final Proposed Plan for Soils in Zone 1 at East Tennessee Technology Park, Oak Ridge, Tennessee Background The East Tennessee Technology Park (ETTP) - formerly known as the Oak Ridge Gaseous Diffusion Plant - was built in the 1940s as part of the Manhattan Project to enrich uranium for use in nuclear weapons. Over time, the mission of the facility changed to that of producing low enriched uranium to fuel commercial and research nuclear reactors and researching new technologies for uranium

  14. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

  15. Oak Ridge recognized for bird protection practices

    Office of Energy Efficiency and Renewable Energy (EERE)

    Oak Ridge’s efforts to protect migratory birds recently garnered honorable mention for the 2013 Presidential Migratory Bird Federal Stewardship Award. The Energy Department championed the effort through partnerships with the Tennessee Wildlife Resources Agency, UT-Battelle, and URS | CH2M Oak Ridge.

  16. Oak Ridge Operations Office of Environmental Management Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Reservation * High levels of rainfall coupled with shallow groundwater carry contaminants to local waterways Oak Ridge is not an isolated or arid site Oak Ridge has a Unique...

  17. Typical Oak Ridge cemesto houses and city bus | Y-12 National Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex Typical Oak Ridge cemesto ... Typical Oak Ridge cemesto houses and city bus Typical Oak Ridge cemesto houses and city bus

  18. Neutron Instruments Added at Oak Ridge (Journal Article) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Neutron Instruments Added at Oak Ridge Citation Details In-Document Search Title: Neutron Instruments Added at Oak Ridge The neutron scattering facilities at Oak Ridge National ...

  19. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  20. Oak Ridge Site Specific Advisory Board Contacts | Department of Energy

    Office of Environmental Management (EM)

    Contacts Oak Ridge Site Specific Advisory Board Contacts Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN 37831 Phone Numbers (865) 241-4583, (865) 241-4584 (800) 382-6938, option 4 Melyssa Noe, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001, EM-942, Oak Ridge, TN 37831 Phone: (865) 241-3315 Fax: (865) 241-6932 Email: Melyssa.Noe@orem.doe.gov Pete Osborne, ORSSAB Support Office Oak Ridge SSAB, P.O. Box 2001, EM-942, Oak Ridge,

  1. Oak Ridge Makes Safety a Community Affair | Department of Energy

    Energy Savers [EERE]

    Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper February 1, 2012 - 12:00pm Addthis Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper OAK RIDGE, Tenn. - K-25, once the world's largest building under one roof, reflects less of its former title every day. Due to the partnership between the U.S

  2. Even more Oak Ridge transitions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ridge to personally announce it. Eugene Wigner left to go back to Princeton and Alvin Weinberg was appointed Scientific Director in December 1948. I would suggest that appointment...

  3. AEC and Oak Ridge Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to residents in 1953 - opening the way for extensive construction 3. In 1956 the first property was sold to private owners 4. In 1959 Oak Ridger's voted to incorporate and...

  4. Oak Ridge: Approaching 4 Million Safe Work Hours

    Broader source: Energy.gov [DOE]

    Workers at URS | CH2M Oak Ridge (UCOR), the prime contractor for EM’s Oak Ridge cleanup, are approaching a milestone of 4 million safe work hours without a lost time away incident.

  5. Oak Ridge Project Opens Possibilities for Future Mission Work, Development

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM is refining the picture of uncontaminated areas within the 33,500-acre Oak Ridge Reservation through a review of historic documents and extensive sampling, analysis and characterization.

  6. Oak Ridge Centers for Manufacturing Technology ? Insights from...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with Dave Beck from Y-12, as well as Co-Director of the Oak Ridge Centers for Manufacturing Technology (ORMCT), was Jack Cook of Oak Ridge National Laboratory"s (ORNL"s)...

  7. Oak Ridge Focuses on Old and New in 2013

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. - In 2013, the Oak Ridge Office of Environmental Management completed numerous projects. Some of the major accomplishments involved reaching two long-standing goals and progressing on the design of a new construction project.

  8. Oak Ridge Site Specific Advisory Board Meetings | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Meeting with Oak Ridge City Manager about the city's perspective on DOE EM work on the Oak Ridge Reservation. March 6, 2015 ORSSAB Meeting - March 2015 Discussion about the FY 2017 ...

  9. Oak Ridge Site Specific Advisory Board Contacts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mailing Address Oak Ridge Site Specific Advisory Board P.O. Box 2001, EM-942 Oak Ridge, TN ... Melyssa Noe, Alternate Deputy Designated Federal Officer U.S. DOE-OREM, P.O. Box 2001, ...

  10. P.O. Box 117, Oak Ridge, TN 37831

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Box 117, Oak Ridge, TN 37831 g (865) 241-8893 g IVsurveys@orau.org On the Web: www.orau.orgenvironmental-assessments-health-physics Oak Ridge Associated Universities (ORAU) is a...

  11. EM's Oak Ridge Office Contractor Scores High in Latest Award...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 27, 2016 - 12:50pm Addthis OAK RIDGE, Tenn. - EM gave URS | CH2M Oak Ridge LLC ... Each year, EM releases information relating to contractor fee payments - earned by ...

  12. Oak Ridge: Approaching 4 Million Safe Work Hours | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge: Approaching 4 Million Safe Work Hours Oak Ridge: Approaching 4 Million Safe Work Hours February 27, 2013 - 12:00pm Addthis Mike Tidwell performs a leak check and ...

  13. Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility...

    Office of Environmental Management (EM)

    Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 The ...

  14. Oak Ridge Reservation Compliance Order, September 26, 1995

    Office of Environmental Management (EM)

    Box 2001, Oak Ridge, TN 37831. Go to Table of Contents http:www.em.doe.govffaaorrffca.html 4252001 Oak Ridge Reservation Compliance Order, September 26, 1995 Page 2 of 5...

  15. EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event ...

  16. DOE's Oak Ridge Office and UCOR Sign Partnering Agreement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) Oak Ridge Office and URS | CH2M Oak Ridge, LLC (UCOR) met to sign a partnering agreement that defines the working arrangement and expectations between the two entities. ...

  17. FTCP Site Specific Information - Oak Ridge Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FTCP Site Specific Information - Oak Ridge Office FTCP Agent Organization Name Phone E-Mail Oak Ridge Patrick Smith 865574-0960 smithpn@oro.doe.gov Annual Workforce Analysis and ...

  18. 2012 Annual Planning Summary for Oak Ridge Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office.

  19. August 1, 2005: Bodman visits Oak Ridge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005: Bodman visits Oak Ridge August 1, 2005: Bodman visits Oak Ridge August 1, 2005: Bodman visits Oak Ridge August 1, 2005 Secretary Bodman visits (pdf) DOE's Oak Ridge National Laboratory to tour the facility and host an all-hands meeting with lab employees. The Secretary tells the employees that he is pleased and enthusiastic, on the whole, with the Energy Policy Act, particularly in that it has measures to encourage more nuclear energy generation. When asked what methods of generation he

  20. Oak Ridge Reservation annual site environmental report summary 1998

    SciTech Connect (OSTI)

    Hamilton, L.V.

    1999-12-01

    This report summarizes the information found in the Oak Ridge Reservation Annual Site Environmental for 1998 (DOE/ORO/2091).

  1. Oak Ridge National Laboratory - Computing and Computational Sciences

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directorate Oak Ridge to acquire next generation supercomputer Oak Ridge to acquire next generation supercomputer The U.S. Department of Energy's (DOE) Oak Ridge Leadership Computing Facility (OLCF) has signed a contract with IBM to bring a next-generation supercomputer to Oak Ridge National Laboratory (ORNL). The OLCF's new hybrid CPU/GPU computing system, Summit, will be delivered in 2017. (more) Links Department of Energy Consortium for Advanced Simulation of Light Water Reactors Extreme

  2. 2013 Annual Planning Summary for the Oak Ridge Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge Office.

  3. Independent Oversight Environment, Oak Ridge National Laboratory - June

    Office of Environmental Management (EM)

    2006 | Department of Energy Environment, Oak Ridge National Laboratory - June 2006 Independent Oversight Environment, Oak Ridge National Laboratory - June 2006 June 2006 Inspection of the Environmental Management Program at the Oak Ridge National Laboratory This report documents the results of an inspection of the environment, safety, and health programs for the environmental management program activities at the Department of Energy's (DOE) Oak Ridge National Laboratory. The inspection was

  4. 2013 Annual Planning Summary for the Oak Ridge National Laboratory

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Oak Ridge National Laboratory.

  5. Oak Ridge Metrology Center | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Services Oak Ridge Metrology Center Capabilities Disciplines Contacts Secure Manufacturing Technical Services Ultrasonic cleaner cuts costs, enhances safety Nuclear...

  6. Waste Management Conference Highlights Oak Ridge's Progress and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnerships | Department of Energy Management Conference Highlights Oak Ridge's Progress and Partnerships Waste Management Conference Highlights Oak Ridge's Progress and Partnerships March 31, 2016 - 1:10pm Addthis Oak Ridge Office of Environmental Management Manager Sue Cange, center, listens to Atomic Trades and Labor Council President Mike Thompson Mike Thompson speak at the Waste Management Conference. Betsy Child, chief of staff and regulatory officer for URS|CH2M Oak Ridge, is at

  7. Independent Activity Report, Oak Ridge Office- June 2011

    Broader source: Energy.gov [DOE]

    Review of the Oak Ridge Office FY 2012 Draft Schedules for Oversight Activities [HIAR-ORO-2011-06-21

  8. Oak Ridge Manufacturing Demonstration Facility (MDF)

    Broader source: Energy.gov [DOE]

    The Manufacturing Demonstration Facility (MDF) is a collabora­tive manufacturing community that shares a common RD&D infrastructure. This shared infrastructure provides affordable access to advanced physical and virtual tools for rapidly demonstrating new manufacturing technologies and optimizing critical processes. Oak Ridge National Laboratory is home to AMO's MDF focused on Additive Manufacturing and Low-cost Carbon Fiber.

  9. Oak Ridge Reservation Waste Management Plan

    SciTech Connect (OSTI)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  10. Oak Ridge reservation land-use plan

    SciTech Connect (OSTI)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  11. EA-1117: Management of Spent Nuclear Fuel on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal for the management of spent nuclear fuel on the U.S. Department of Energy's Oak Ridge Reservation to implement the preferred alternative...

  12. Recommendation 215: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation

    Broader source: Energy.gov [DOE]

    The Oak Ridge Site Specific Advisory Board approved the enclosed recommendation on remaining legacy materials on the Oak Ridge Reservation.

  13. Voluntary Protection Program Onsite Review, Oak Ridge Associated Universities, Oak Ridge Institute for Science and Education- January 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Recertification of ORISE/ORAU at Oak Ridge as a Star Participant in the Department of Energy Voluntary Protection Program.

  14. DOE Prepared for Implementation of Oak Ridge Transuranic Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center Services | Department of Energy Oak Ridge Transuranic Waste Processing Center Services DOE Prepared for Implementation of Oak Ridge Transuranic Waste Processing Center Services October 9, 2015 - 4:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) awarded a contract on June 18, 2015 to North Wind Solutions, LLC for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak

  15. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    February 10, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ............................................................................ 6:006:05 A. March 9 Presentation Topic: FY 2018 Budget Formulation and Prioritization of Projects B. Introduction of New Members (S. Cange) II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (S. Cange, C. Jones, K. Czartoryski)

  16. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    9, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (A. Cook) ......................................................................... 6:00-6:05 A. April - No Meeting in Lieu of Spring Chairs Meeting B. Presentation of Service Award (M. Noe) II. Comments from the Alternate Deputy Designated Federal Officer, and EPA and TDEC Liaisons (M. Noe, C. Jones, K. Czartoryski) .................................................... 6:05-6:15 III.

  17. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request Background Each year the U.S. Department of Energy (DOE) Environmental Management (EM) Program develops its budget request for the fiscal year two years beyond the current fiscal year, incorporating budget requests from DOE field offices to develop the EM Program budget request to the president. DOE EM Headquarters typically issues guidelines to the field offices advising them how much

  18. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    May 11, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (B. Price) ............................................................................ 6:00-6:05 A. June Presentation Topic: Technology Development to Support the DOE Mercury Cleanup Strategy (Issue Group Members: Price, Trujillo, Wilson) B. Presentation of Service Awards to Student Representatives (S. Cange) C. Introduction of New Student Representative (S. Cange) II. Comments

  19. Oak Ridge Associated VERIFICATION Universities OF OF

    Office of Legacy Management (LM)

    y /I/ i Prepared by Oak Ridge Associated VERIFICATION Universities OF OF - Prepared for the Decontamination and 1985 AND 1986 REMEDIAL ACTIONS Decommissioning Division NIAGARA FALLS STORAGE SITE U.S. Department VICINITY PROPERTIES of Energy of Energy LEWISTON, NEW YORK 3I~~~~ ~~~J. D. BERGER l I I I I I Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT JULY 1990 VERIFICATION OF 1985 AND 1986 REMEDIAL ACTIONS NIAGARA FALLS STORAGE SITE VICINITY

  20. ORNL (Oak Ridge National Laboratory) 89

    SciTech Connect (OSTI)

    Anderson, T.D.; Appleton, B.R.; Jefferson, J.W.; Merriman, J.R.; Mynatt, F.R.; Richmond, C.R.; Rosenthal, M.W.

    1989-01-01

    This is the inaugural issues of an annual publication about the Oak Ridge National Laboratory. Here you will find a brief overview of ORNL, a sampling of our recent research achievements, and a glimpse of the directions we want to take over the next 15 years. A major purpose of ornl 89 is to provide the staff with a sketch of the character and dynamics of the Laboratory.

  1. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  2. Processing of Oak Ridge Mixed Waste Labpacks

    SciTech Connect (OSTI)

    Estes, C. H.; Franco, P.; Bisaria, A.

    2002-02-26

    The Oak Ridge Site Treatment Plan (STP) issued under a Tennessee Commissioner's Order includes a compliance milestone related to treatment of mixed waste labpacks on the Oak Ridge sites. The treatment plan was written and approved in Fiscal Year 1997. The plan involved approximately 1,100 labpacks and 7,400 on-the-shelf labpackable items stored at three Department of Energy (DOE) sites on the Oak Ridge Reservation (ORR). The labpacks and labpack items consist of liquids and solids with various chemical constituents and radiological concerns. The waste must be processed for shipment to a commercial hazardous waste treatment facility or treatment utilizing a Broad Spectrum mixed waste treatment contract. This paper will describe the labpack treatment plan that was developed as required by the Site Treatment Plan and the operations implemented to process the labpack waste. The paper will discuss the labpack inventory in the treatment plan, treatment and disposal options, processing strategies, project risk assessment, and current project status.

  3. Oak Ridge Lays Out Big Plans for 2012

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Last year, Oak Ridge’s Environmental Management (EM) program logged one of its most successful years due to sound project management and achievements in American Recovery and Reinvestment Act work.

  4. Oak Ridge Reflects on 30 Years of Cleanup

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program hosted an event this month that documented the site’s environmental cleanup efforts since 1983, six years before the official founding of the Department’s EM.

  5. New EM Facility Treats Groundwater at Oak Ridge

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Oak Ridge’s EM program is operating a new facility that reduces the amount of contaminants entering Mitchell Branch, a stream at DOE’s East Tennessee Technology Park.

  6. Evaluation of Side Stream Filtration Technology at Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Evaluation of Side Stream Filtration Technology at Oak Ridge National Laboratory Document provides an in-depth look at side stream filtration at Oak Ridge National Laboratory. Download the Side Stream Filtration evaluation document. (1.48 MB) More Documents & Publications Side Stream Filtration for Cooling Towers Technical Evaluation of Side Stream Filtration for Cooling

  7. ORISE: Recruiting students and faculty to Oak Ridge National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORNL Recruitment ORISE helps bring the next generation of student and faculty researchers to Oak Ridge National Laboratory Research laboratory at ORNL Since 1992 when it was established as an official U.S. Department of Energy (DOE) institute, the Oak Ridge Institute for Science and Education (ORISE) has operated research participation and science education activities for Oak Ridge National Laboratory (ORNL). How ORISE is Making a Difference ORNL, which is recognized as DOE's largest science and

  8. ORISE: Supporting ARRA funded cleanup activities in Oak Ridge, Tenn.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORISE supporting Oak Ridge reservation cleanup activities through recovery funding ORISE technician performs an environmental scan Disposing of old and contaminated buildings, and remediating soil and groundwater across the Oak Ridge Reservation has long been a priority for the U.S. Department of Energy (DOE)-Oak Ridge Office (ORO). Though much of the work wasn't expected to begin for another three to four years, the acquisition of $755 million in American Recovery and Reinvestment Act (ARRA)

  9. Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) Fact Sheet: Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) The Collaboration of Oak Ridge, Argonne, and Livermore (CORAL) is a joint procurement activity among three of the Department of Energy's National Laboratories launched in 2014 to build state-of-the-art high-performance computing technologies that are essential for supporting U.S. national nuclear security and are key tools used for

  10. Oak Ridge City Center Technology Demonstration Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Oak Ridge City Center Technology Demonstration Project Oak Ridge City Center Technology Demonstration Project Project objectives: To broaden market understanding of large-scale GSHP technology, and the design considerations that will impact front-end costs, ongoing maintenance costs, future energy savings, and system breakeven/lifecycle cost. gshp_thrash_oak_ridge_city_center.pdf (463.1 KB) More Documents & Publications Ground Source Heat Pump System Data Analysis Analysis of

  11. Oak Ridge Site Specific Advisory Board | Department of Energy

    Energy Savers [EERE]

    Facilities » Oak Ridge Manufacturing Demonstration Facility (MDF) Oak Ridge Manufacturing Demonstration Facility (MDF) The Manufacturing Demonstration Facility (MDF) is a collabora-tive manufacturing community that shares a common RD&D infrastructure. This shared infrastructure provides affordable access to advanced physical and virtual tools for rapidly demonstrating new manufacturing technologies and optimizing critical processes. Oak Ridge National Laboratory is home to AMO's MDF focused

  12. Independent Oversight Review, Oak Ridge Transuranic Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center, September 2013 | Department of Energy Oak Ridge Transuranic Waste Processing Center, September 2013 Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013 September 2013 Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes. This report documents the results of an independent oversight review of the management of safety significant structures, systems, and

  13. DOE's Oak Ridge Supercomputer Now World's Fastest for Open Science |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Supercomputer Now World's Fastest for Open Science DOE's Oak Ridge Supercomputer Now World's Fastest for Open Science November 10, 2008 - 4:47pm Addthis OAK RIDGE, Tenn. -- The latest upgrade to the Cray XT Jaguar supercomputer at the Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) has increased the system's computing power to a peak 1.64 "petaflops," or quadrillion mathematical calculations per second, making Jaguar the world's first

  14. Recommendation 169: Establishment of an Oak Ridge Oral History Program

    Broader source: Energy.gov [DOE]

    The ORSSAB recommends DOE-ORO fully endorse the establishment of an Oak Ridge Oral History Program and provide necessary assistance.

  15. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MDDC 869 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE DIFFRACTION OF NEUTRONS BY CRYSTALLINE POWDERS by E. 0. Wollan C. G. Shull Clinton Laboratories Published ...

  16. DOE Issues Final Request for Proposal for Oak Ridge Transuranic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NAICS) Code 562211, Hazardous Waste Treatment and Disposal. ... and disposition of TRU soil and debris waste; ... the Oak Ridge National Laboratory; and processing Nuclear ...

  17. 2011 Annual Planning Summary for Oak Ridge Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Oak Ridge Operations Office (OR) (See Environmental Management ...

  18. Thorium Fuel Cycle Pilot Experiences at Oak Ridge National Laboratory...

    Office of Scientific and Technical Information (OSTI)

    Resource Type: Conference Resource Relation: Conference: 2014 ANS Winter Meeting and Nuclear Technology Expo, Anaheim, CA, USA, 20141109, 20141113 Research Org: Oak Ridge National ...

  19. FTCP Site Specific Information - Oak Ridge Office of Environmental...

    Office of Environmental Management (EM)

    Office of Environmental Management FTCP Site Specific Information - Oak Ridge Office of Environmental Management Annual Workforce Analysis and Staffing Plan Report Calendar Year...

  20. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Broader source: Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  1. Mr. David Hemelright, Chair Oak Ridge Site Specific Advisory...

    Office of Environmental Management (EM)

    Advisory Board P.O. Box 2001 , EM-91 Oak Ridge, ... Department's of Energy' s (DOE) Office of Legacy Management. ... , (5) documentation of budget and authority, (6) ...

  2. Health Education Specialist/Project Manager Oak Ridge Institute...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to addressing minority health disparities in your community, please contact: rose marie Womble, mSSW Health Education SpecialistProject Manager Oak Ridge Institute for...

  3. ORIS: the Oak Ridge Imaging System program listings. [Nuclear...

    Office of Scientific and Technical Information (OSTI)

    program listings. Nuclear medicine imaging with rectilinear scanner and gamma camera Citation Details In-Document Search Title: ORIS: the Oak Ridge Imaging System program...

  4. City of Oak Ridge, Tennessee (Utility Company) | Open Energy...

    Open Energy Info (EERE)

    Tennessee (Utility Company) Jump to: navigation, search Name: City of Oak Ridge Place: Tennessee Phone Number: (865) 425-1803 Website: www.oakridgetn.govdepartment Twitter:...

  5. Addressing Challenging Materials at Oak Ridge National Laboratory...

    Office of Scientific and Technical Information (OSTI)

    Title: Addressing Challenging Materials at Oak Ridge National Laboratory No abstract prepared. Authors: Jubin, Robert Thomas 1 ; Patton, Bradley D 1 ; Robinson, Sharon M 1 ; ...

  6. EM's Oak Ridge Office Launches New Website | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Conference Highlights Oak Ridge's Progress and Partnerships CRESO Director John Byrd provides direction to students gathering data for their research on the region's box turtle. ...

  7. NREL: MIDC/Oak Ridge National Laboratory Rotating Shadowband Radiometer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (35.93 N, 84.31 W, 245 m, GMT-5) Oak Ridge National Laboratory Irradiance Inc. Rotating Shadowband

  8. Independent Oversight Targeted Review, Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities The U.S....

  9. Oak Ridge National Laboratory Evaluation for Drum Characterization...

    Office of Environmental Management (EM)

    This document corresponds to Appendix E: Drum Characterization Integrated Summary Report of the Technical Assessment Team Report. Oak Ridge National Laboratory Evaluation for Drum ...

  10. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot...

    Office of Environmental Management (EM)

    This document corresponds to Appendix C: Analysis Integrated Summary Report of the Technical Assessment Team Report. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot ...

  11. Inspection, Oak Ridge National Laboratory - July 2004 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    4 Inspection of Environment, Safety, and Health Management at the Oak Ridge National Laboratory This report provides the results of an inspection of environment, safety, and health...

  12. Waste Management Conference Highlights Oak Ridge's Progress and...

    Office of Environmental Management (EM)

    Management Conference Highlights Oak Ridge's Progress and Partnerships Waste Management ... Council President Mike Thompson Mike Thompson speak at the Waste Management Conference. ...

  13. Workplace Charging Challenge Partner: Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge National Laboratory's (ORNL's) Sustainable Campus Initiative contains a roadmap for development of electric vehicle charging stations, indicating that plug-in electric ...

  14. Reliability of Oak Ridge Facilities Grows (Journal Article) ...

    Office of Scientific and Technical Information (OSTI)

    Resource Relation: Journal Name: Neutron News; Journal Volume: 22; Journal Issue: 2 Research Org: ... Subject: 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; RELIABILITY; OAK RIDGE; ...

  15. The Oak Ridge Institute for Science and Education Human Subjects...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human Subjects Research Program PrivacySecurity Statement Contact | Forms PurposeMission ... The Oak Ridge Institute for Science and Education (ORISE) Human Subjects Research Program ...

  16. CHP Research and Development - Presentation by Oak Ridge National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 Presentation on Combined Heat and Power (CHP) Research and Development, given by K. Dean ...

  17. Field Use of NMIS at Oak Ridge

    SciTech Connect (OSTI)

    Chiang, L.G.; Conger, M.; Hughes, S.S.; Mattingly, J.K.; McEvers, J.A.; Mihalczo, J.T.; Mullens, J.A.; Perez, R.B.; Turner, C.R.; Uckan, T.; Valentine, T.E.

    1999-08-26

    The Nuclear Materials Identification System (NMIS), developed by the Oak Ridge National Laboratory and Oak Ridge Y-12 Plant (Y-12), has been successfully used at Y-12 for nuclear material control and accountability (NMC&A). It is particularly useful in the high gamma-ray background of storage arrays and for shielded HEU. With three systems in use at Y-12, NMIS has enhanced the NMC&A capability for verification and for confirmation of materials in storage and for HEU receipts by providing capability not available or practical by other NDA methods for safeguards. It has recently cost-effectively quantified the HEU mass and enrichment of hundreds of HEU metal items to within a total spread of {+-} 5% (3 sigma) with and mean deviations for all HEU verified of + 0.2% for mass and {minus}0.2% for enrichment. Three cart portable systems are easily moved around with minimal impact on facility operations since no permanent dedicated floor space is required. The positive impact of NMIS at the Oak Ridge Y-12 Plant is improved and more cost effective NMC&A as well as the resolution of NMC&A findings. Its operation at the Y-12 Plant is essential for compliance with the NMC&A requirements of the US Department of Energy. NMIS portability has allowed one system to be moved temporarily to the former K-25 Gaseous Diffusion Plant for characterization of a large deposit of hydrated uranyl fluoride. The impact of this NMIS application was enhanced and verified nuclear criticality safety that led to the safe removal of a large deposit originally estimated by gamma-ray spectrometry and neutron counting to contain 1300 kg of 3.3 wt% {sup 235}U material. NMIS has also been operational at Los Alamos National Laboratory and Pantex.

  18. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    June 8, 2016, 6:00 p.m. DOE Information Center 1 Science.gov Way, Oak Ridge, Tenn. AGENDA I. Welcome and Announcements (A. Cook) ........................................................................... 6:00-6:05 A. July 13-New Member Training Meeting B. August 6-Annual Planning Meeting, 8:00 a.m.-2:00 p.m., Tremont Lodge, Townsend, TN C. Presentation of Service Awards to Outgoing Members (S. Cange) II. Comments from the Deputy Designated Federal Officer, and EPA and TDEC Liaisons (S. Cange,

  19. Oak Ridge Mobile Agent Community (ORMAC)

    Energy Science and Technology Software Center (OSTI)

    2003-06-30

    The Oak Ridge Mobile Agent Community (ORMAC) framework software facilitates the execution of a collection of mobile software agents across a heterogeneous collection of computer systems. ORMAC provides the software agents with the ability to communicate with each other in a synchronous and asynchronous manner. Also, ORMAC allows the software agents to move to any computer system in the community and continue execution there. ORMAC is intended to aid programmers in solving a very generalmore » set of distributed software problems.« less

  20. Oak Ridge Micro Energy Inc | Open Energy Information

    Open Energy Info (EERE)

    Ridge, Tennessee Zip: 37830 Product: Developer and producer of thin film rechargeable lithium and lithium-ion batteries. References: Oak Ridge Micro-Energy Inc1 This article is...

  1. Oak Ridge Community Meeting Focused on Enabling Future Missions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Community Meeting Focused on Enabling Future Missions Oak Ridge Community Meeting Focused on Enabling Future Missions June 15, 2016 - 12:35pm Addthis OREM Manager Sue Cange ...

  2. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  3. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  4. Federal Facility Agreement (FFA) Signed at Oak Ridge

    Broader source: Energy.gov [DOE]

    The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a CERCLA-required agreement among DOE, the United States Environmental Protection Agency, and the Tennessee Department of Environment and Conservation to promote cooperation and participation to clean and remediate the Oak Ridge Reservation.

  5. 60 Years of Great Science (Oak Ridge National Laboratory)

    DOE R&D Accomplishments [OSTI]

    2003-01-01

    This issue of Oak Ridge National Laboratory Review (vol. 36, issue 1) highlights Oak Ridge National Laboratory's contributions in more than 30 areas of research and related activities during the past 60 years and provides glimpses of current activities that are carrying on this heritage.

  6. DOE Issues Sources Sought/Request for Information for Oak Ridge...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sources SoughtRequest for Information for Oak Ridge Office of Environmental Management Technical Support Services DOE Issues Sources SoughtRequest for Information for Oak Ridge ...

  7. Oak Ridge National Laboratory Wins DOE Mentor of the Year Award at Small Business Forum & Expo

    Broader source: Energy.gov [DOE]

    Oak Ridge National Laboratory of Oak Ridge, TN, won the DOE Mentor Award at the Small Business Forum & Expo in Tampa, FL, on July 12, 2014

  8. Preliminary Notice of Violation, MK-Ferguson of Oak Ridge Company- EA-98-08

    Office of Energy Efficiency and Renewable Energy (EERE)

    Issued to MK-Ferguson of Oak Ridge Company, related to Bioassay Program Deficiencies at DOE's Oak Ridge Facilities, (EA-98-08)

  9. EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee.

  10. Source document for waste area groupings at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Osborne, P.L.; Kuhaida, A.J., Jr.

    1996-09-01

    This document serves as a source document for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and other types of documents developed for and pertaining to Environmental Restoration (ER) Program activities at Oak Ridge National Laboratory (ORNL). It contains descriptions of the (1) regulatory requirements for the ORR ER Program, (2) Oak Ridge Reservation (ORR) ER Program, (3) ORNL site history and characterization, and (4) history and characterization of Waste Area Groupings (WAGS) 1-20. This document was created to save time, effort, and money for persons and organizations drafting documents for the ER Program and to improve consistency in the documents prepared for the program. By eliminating the repetitious use of selected information about the program, this document will help reduce the time and costs associated with producing program documents. By serving as a benchmark for selected information about the ER Program, this reference will help ensure that information presented in future documents is accurate and complete.

  11. Oak Ridge Reservation Environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R.

    1991-09-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1990. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1990 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1.

  12. Pulsed reactor experiments at Oak Ridge

    SciTech Connect (OSTI)

    Mihalczo, J.T.

    1994-12-31

    This paper describes dynamic experiments for 3 pulsed reactors. 1st reactor was pulsed from some average power by rotating a partial Be reflector past an unreflected core face; the other 2 reactors were pulsed by rapid insertion of a fuel rod into the unmoderated and unreflected reactor at essentially zero neutron level with no significant neutron source present. The first reactor was a mockup of an EURATOM design (never constructed) of the proposed SORA Reactor, and the other two were the Health Physics Research Reactor and the Army Pulse Radiation Facility Reactor (APRFR). This paper describes the experiments performed in initial testing of these systems, including destructive tests of APRFR, to set operating limits for this type of reactor in pulsed operation. All the experiments described were performed at the Oak Ridge Critical Experiments Facility.

  13. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R.

    1990-10-01

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1989. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1989 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1. 16 figs., 194 tabs.

  14. Oak Ridge Associated Post Office Box 117 Universities Oak Ridge, Tennessee 37831-0117

    Office of Legacy Management (LM)

    Associated Post Office Box 117 Universities Oak Ridge, Tennessee 37831-0117 June 19, 1990 Mr. James Wagoner, II FUSRAP Program Manager Decontamination and Decommissioning Division ' Office of Environmental .Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: SCOPING VISIT TO FORMER ZUCKERMAN SITE - N. KENM( AVENUE, CHICAGO, ILLINOIS 0 9Yf onment ?ms Division IRE Dear Mr. Wagoner: On June 14, 1990, while in the Chicago area for several other meetings, Ms.

  15. Tiger team assessment of the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    none,

    1990-02-01

    This document contains findings identified during the Tiger Team Compliance Assessment of the Department of Energy's (DOE's) Y-12 Plant in Oak Ridge, Tennessee. The Y-12 Plant Tiger Team Compliance Assessment is comprehensive in scope. It covers the Environmental, Safety, and Health (including Occupational Safety and Health Administration (OSHA) compliance), and Management areas and determines the plant's compliance with applicable federal (including DOE), state, and local regulations and requirements. 4 figs., 12 tabs.

  16. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  17. Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory On May 13, 2009, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement issued an Enforcement Letter to UT-Battelle related to radioactive noble gas

  18. Secretary Moniz Visits Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Visits Oak Ridge National Laboratory Secretary Moniz Visits Oak Ridge National Laboratory June 5, 2013 - 3:18pm Addthis Energy Secretary Moniz at CASL 1 of 25 Energy Secretary Moniz at CASL Secretary Moniz tours the Consortium for Advanced Simulation of Light Water Reactors (CASL) facility at Oak Ridge National Laboratory (ORNL). CASL is one of the Energy Department's Energy Innovation Hubs. Date taken: 2013-06-03 12:04 Energy Secretary Moniz at CASL 2 of 25 Energy Secretary Moniz at CASL (From

  19. Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility

    Office of Environmental Management (EM)

    Building 9204-3 | Department of Energy Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 Report of Survey of Oak Ridge Isotope Enrichment (Calutron) Facility Building 9204-3 The purpose of this document is to report the results of a survey conducted at the Isotope Enrichment Facility (IEF, Calutron, Building 9204-3) on the Y-12 Plant property at the Oak Ridge Site. The survey was conducted during the week of November 29, 1999. The primary purpose of the

  20. CHP Research and Development - Presentation by Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory, June 2011 | Department of Energy Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 CHP Research and Development - Presentation by Oak Ridge National Laboratory, June 2011 Presentation on Combined Heat and Power (CHP) Research and Development, given by K. Dean Edwards of Oak Ridge National Lab, at the U.S. DOE Industrial Distributed Energy Portfolio Review Meeting in Washington, D.C. on June 1-2, 2011. chp_rd_edwards.pdf (927.22 KB) More Documents

  1. Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request

    Broader source: Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2018.

  2. Recommendation 228: Recommendations on the FY 2017 DOE Oak Ridge Environmental Management Budget Request

    Broader source: Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2017.

  3. World War II role of Oak Ridge National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    War II role of Oak Ridge National Lab featured in second 70th anniversary lecture February ... about that laboratory's role during World War II and the shared national security mission ...

  4. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS

    Office of Legacy Management (LM)

    AL, 3 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS CINCINNATI AREA P. 0. BOX 39198, CINCINNATI 39, OHIO IN REPLY REFER TO: 0:OJT --r.LAal Cl E:c Mr. J. H. Noyes, ...

  5. Follow-up Review, Oak Ridge National Laboratory - December 2001...

    Broader source: Energy.gov (indexed) [DOE]

    Follow-up Review of the Oak Ridge National Laboratory Health Services Division This report summarizes the results of a follow-up evaluation to an occupational medicine program ...

  6. 60 years of great science [Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    2003-01-01

    This issue highlights Oak Ridge National Laboratory's contributions in more than 30 areas of research and related activities during the past 60 years and provides glimpses of current activities that are carrying on this heritage.

  7. Oak Ridge Centers for Manufacturing Technology, part 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program of the 1960's through the early 1980's, the Oak Ridge Centers for Manufacturing Technology (ORMCT) in the 1990's was also a most unique and unusual effort. It was...

  8. Oak Ridge Centers for Manufacturing Technology, part 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the ORNL Review, Vol. 28, No. 1, featured an article titled, "Oak Ridge Solution to Manufacturing Problems," written by Bill Wilburn. Bill"s introductory caption to his lead...

  9. Recent Demolition Makes Oak Ridge National Laboratory Cleaner...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ben Williams , (865) 576-0885, http:www.oakridge.doe.gov OAK RIDGE, Tenn. - U.S. Department of Energy (DOE) cleanup contractor Safety and Ecology Corporation recently removed ...

  10. Mr. David Hernelright Chair, Oak Ridge Site Specific Advisory...

    Office of Environmental Management (EM)

    Board P.O. Box 2001 Oak Ridge, Tennessee 3 7831 Dear Mr. ... at DOE EM continues to be aware of the implications of funding constraints stemming from across the board budget ...

  11. Oak Ridge Office of Environmental Management P.O

    Office of Environmental Management (EM)

    Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... The Department of Energy (DOE) has proceeded with the ... The funding is included in DOE's annual budget request, and ...

  12. ‘Project Wipeout’ Helps Clean Up Oak Ridge

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – A term like “Project Wipeout,” may conjure images of military operations, extreme sporting events or a comical competition show on television.

  13. B & W Y-12 and 14 Years in Oak Ridge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Y-12 and 14 Years in Oak Ridge I well recall the transition that began in November, 2000, when BWXT Y-12 (now B&W Y-12) took over the management and operating contract for what...

  14. Oak Ridge National Laboratory to be Fueled by Biomass

    Broader source: Energy.gov [DOE]

    When construction is complete in 2011, Oak Ridge National Laboratory’s biomass steam plant will be fueled by roughly 50,000 tons of waste wood per year.

  15. Oak Ridge North, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    article is a stub. You can help OpenEI by expanding it. Oak Ridge North is a city in Montgomery County, Texas. It falls under Texas's 8th congressional district.12 References...

  16. Oak Ridge Site Specific Advisory Board Annual Meeting Sue Cange

    Office of Environmental Management (EM)

    August 6, 2016 www.energy.govEM 2 * As the largest cleanup program in the world, EM is responsible for ... dialogue with the communities surrounding the Oak Ridge ...

  17. Science and Technology at Oak Ridge National Laboratory

    ScienceCinema (OSTI)

    Mason, Thomas

    2013-02-25

    ORNL Director Thom Mason explains the groundbreaking work in neutron sciences, supercomputing, clean energy, advanced materials, nuclear research, and global security taking place at the Department of Energy's Office of Science laboratory in Oak Ridge, Tenn.

  18. Department of energy oak riDge office

    Broader source: Energy.gov (indexed) [DOE]

    present risk and hinder the Department's missions. 2 DEpaRTMEnT Of EnERgy Oak RiDgE ... Technology Park (ETTP)-evolved and conducted different missions for the Department. ...

  19. Science and Technology at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Mason, Thomas

    2012-11-01

    ORNL Director Thom Mason explains the groundbreaking work in neutron sciences, supercomputing, clean energy, advanced materials, nuclear research, and global security taking place at the Department of Energy's Office of Science laboratory in Oak Ridge, Tenn.

  20. Oak Ridge, Tennessee: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Oak Ridge is a city in Anderson County and Roane County, Tennessee. It falls under Tennessee's 3rd congressional...

  1. Questions remain on funding for cleanup of Oak Ridge Reservation

    Broader source: Energy.gov [DOE]

    There is great uncertainty on what the looming federal budget cuts will be and what effect they will have on funding for the Department of Energy’s (DOE) Environmental Management (EM) program at the Oak Ridge Reservation (ORR).

  2. Oak Ridge's Reindustrialization Program Named Finalist for National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reindustrialization Program at the U.S. Department of Energy's (DOE) Oak Ridge Office (ORO) was recently named a finalist in the U.S. General Services Administration's (GSA) 14th...

  3. Bill Wilcox ? The transformation and second birth of Oak Ridge...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    more in his honor somewhere in town, fittingly in our Municipal Building; so much of the shape of the Oak Ridge of today was created under his direction." Bill then brings to...

  4. Oak Ridge Site Specific Advisory Board * P.O...

    Office of Environmental Management (EM)

    TN 37831 Phone: 865-241-4583, 865-241-4584, 1-800-382-6938 * Fax: 865-574-3521 * Internet: www.oakridge.doe.govemssab Many Voices Working for the Community Oak Ridge Site...

  5. Oak Ridge Reservation environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R.

    1991-09-01

    The purpose of this report is to provide information to the public about the impact of the US Department of Energy's (DOE's) facilities located on the Oak Ridge Reservation (ORR) on the public and the environment. It describes the environmental surveillance and monitoring activities conducted at and around the DOE facilities operated by Martin Marietta Energy Systems, Inc. Preparation and publication of this report is in accordance with DOE Order 5400.1. The order specifies a publication deadline of June of the following year for each calendar year of data. The primary objective of this report is to summarize all information collected for the previous calendar year regarding effluent monitoring, environmental surveillance, and estimates of radiation and chemical dose to the surrounding population. When multiple years of information are available for a program, trends are also evaluated. The first seven sections of Volume 1 of this report address this objective. The last three sections of Volume 1 provide information on solid waste management, special environmental studies, and quality assurance programs.

  6. The Oak Ridge Reservation Annual Site Environmental Report Summary, 2007

    SciTech Connect (OSTI)

    None, None

    2009-02-28

    The Oak Ridge Reservation Annual Site Environmental Report is prepared and published each year to inform the public of the environmental activities that take place on the reservation and in the surrounding areas. It is written to comply with DOE Order 231.1A, Environment, Safety, and Health Reporting. This document has been prepared to present the highlights of the Oak Ridge Reservation Annual Site Environmental Report 2007 in an easy-to-read, summary format.

  7. Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Annual Report | Department of Energy Oak Ridge Transportation Technology Program Annual Report Vehicle Technologies Office: 2008 Oak Ridge Transportation Technology Program Annual Report ornl_ttp_report_fy08.pdf (4.58 MB) More Documents & Publications FY 2008 Progress Report for Lightweighting Materials - 1. Introduction 2011 Annual Progress Report for Lightweighting Materials FY 2009 Progress Report for Lightweighting Materials - 7. Low-Cost Carbon Fiber

  8. Oak Ridge National Laboratory | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Oak Ridge National Laboratory A snapshot of NNSA's counterterrorism mission NNSA's mission of counterterrorism and counterproliferation is supported through innovative science and technology. Recently, Associate Administrator and Deputy Undersecretary for Counterterrorism and Counterproliferation Jay Tilden visited Oak Ridge National Laboratory (ORNL) and met with... Sandia's ice sheet modeling of Greenland, Antarctica helps predict sea-level rise The Greenland and Antarctic ice sheets will make

  9. Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on the DOE GIS include descriptions of future decisions or actions on cleanup areas. ORSSAB recommends that all fact sheets identify future actions expected or planned. Recommendation225.pdf (148.18 KB) Responseto225.pdf (238.07 KB) More Documents & Publications Recommendation 224: Recommendations on the FY

  10. EERE Success Story-Tennessee: Oak Ridge National Laboratory Optimizes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% | Department of Energy Oak Ridge National Laboratory Optimizes Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% EERE Success Story-Tennessee: Oak Ridge National Laboratory Optimizes Carbon Fiber Production, Reduces Carbon Fiber Costs by 30% January 24, 2014 - 12:00am Addthis The high cost of aerospace-grade carbon fiber (CF) is currently a barrier to widespread commercialization of light-weight, high-pressure hydrogen and

  11. Oak Ridge National Laboratory NPDES Water Quality Protection Plan

    Office of Environmental Management (EM)

    Energy Increases Focus on Mercury Cleanup Oak Ridge EM Program Increases Focus on Mercury Cleanup May 7, 2013 - 12:00pm Addthis Tennessee Department of Environment and Conservation Commissioner Robert Martineau, left to right, U.S. Sen. Lamar Alexander (R-Tenn.), Oak Ridge EM Manager Mark Whitney, EM Senior Advisor Dave Huizenga and EPA Deputy Regional Administrator for Region 4 Stan Meiburg gathered for the announcement on mercury cleanup. Tennessee Department of Environment and

  12. Oak Ridge Reservation Compliance Order, September 26, 1995 Summary

    Office of Environmental Management (EM)

    Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge

  13. Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge

    Office of Environmental Management (EM)

    Environmental Management Budget Request | Department of Energy 4: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request ORSSAB agrees with DOE's cleanup priorities and encourages DOE EM to request funding sufficient to adequately address those projects. Recommendation 224 (55.5 KB) Responseto224.pdf (130.65 KB) More Documents & Publications

  14. Recommendation 228: Recommendations on the FY 2017 DOE Oak Ridge

    Office of Environmental Management (EM)

    Department of Energy 5: Recommendation on DOE Oak Ridge GIS Fact Sheets Recommendation 225: Recommendation on DOE Oak Ridge GIS Fact Sheets Not all fact sheets that can be accessed on the DOE GIS include descriptions of future decisions or actions on cleanup areas. ORSSAB recommends that all fact sheets identify future actions expected or planned. Recommendation225.pdf (148.18 KB) Responseto225.pdf (238.07 KB) More Documents & Publications Recommendation 224: Recommendations on the FY

  15. Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Act | Department of Energy Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of Justice press release announcing that a federal grand jury in the Eastern District of Tennessee has charged a former contract worker, Roy Lynn Oakley, at East Tennessee Technology Park with converting to his own use restricted government materials utilized for uranium enrichment and

  16. Energy Department's Oak Ridge National Laboratory Unveils New

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crowdsourcing Website for Building Technologies | Department of Energy Oak Ridge National Laboratory Unveils New Crowdsourcing Website for Building Technologies Energy Department's Oak Ridge National Laboratory Unveils New Crowdsourcing Website for Building Technologies March 2, 2015 - 3:30pm Addthis As part of the Energy Department's efforts to improve the energy efficiency of the nation's homes and buildings, lower energy costs, and enhance U.S. competitiveness in manufacturing, the Energy

  17. ISC-Oak Ridge Office Environmental Assessments (EA) / Environmental Impact

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Statements (EIS) | U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and

  18. Analysis Activities at Oak Ridge National Laboratory | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge National Laboratory Analysis Activities at Oak Ridge National Laboratory Presentation on ORNL's analysis activities to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004. 15_ornl_greene_ferrada.pdf (4.45 MB) More Documents & Publications Integrated Market Modeling of Hydrogen Transition Scenarios with HyTrans DOE Hydrogen Transition Analysis Workshop DOE Analysis Related to H2USA

  19. Assessment of the Integrated Facility Disposition Project at Oak Ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory & Y-12 for Transfer of Facilities & Materials to EM | Department of Energy the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM Assessment of the Integrated Facility Disposition Project at Oak Ridge National Laboratory & Y-12 for Transfer of Facilities & Materials to EM In December 2007, the Assistant Secretary for Environmental Management (EM-1) invited the DOE Program

  20. INDEPENDENT VERIFICATION OF THE BUILDING 3550 SLAB AT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-05-08

    The Oak Ridge Institute for Science and Education (ORISE) has completed the independent verification survey of the Building 3550 Slab. The results of this effort are provided. The objective of this verification survey is to provide independent review and field assessment of remediation actions conducted by Safety and Ecology Corporation (SEC) to document that the final radiological condition of the slab meets the release guidelines. Verification survey activities on the Building 3550 Slab that included scans, measurements, and the collection of smears. Scans for alpha, alpha plus beta, and gamma activity identified several areas that were investigated.

  1. Data Sharing Report Characterization of Isotope Row Facilities Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    Weaver, Phyllis C

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort was designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The

  2. The development of an aquatic spill model for the White Oak Creek watershed, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Johnson, R.O.

    1996-05-01

    This study develops an aquatic spill model applicable to the White Oak Creek watershed draining the Oak Ridge National Laboratory. Hazardous, toxic, and radioactive chemicals are handled and stored on the laboratory reservation. An accidental spill into the White Oak Creek watershed could contaminate downstream water supplies if insufficient dilution did not occur. White Oak Creek empties into the Clinch River, which flows into the Tennessee River. Both rivers serve as municipal water supplies. The aquatic spill model provides estimates of the dilution at sequential downstream locations along White Oak creek and the Clinch River after an accidental spill of a liquid containing a radioactively decaying constituent. The location of the spill on the laboratory is arbitrary, while hydrologic conditions range from drought to extreme flood are simulated. The aquatic spill model provides quantitative estimates with which to assess water quality downstream from the site of the accidental spill, allowing an informed decision to be made whether to perform mitigating measures so that the integrity of affected water supplies is not jeopardized.

  3. Oak Ridge Moves Closer to Reaching Vision 2016

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – About 70 employees, community leaders, and local officials recently gathered to witness the completion of K-31 Building’s demolition at Oak Ridge’s East Tennessee Technology Park (ETTP), marking the removal of the fourth of five gaseous diffusion buildings at the former uranium enrichment site.

  4. Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request | Department

    Office of Environmental Management (EM)

    of Energy 9 : FY 2014 DOE Oak Ridge EM Budget Request Recommendation 209 : FY 2014 DOE Oak Ridge EM Budget Request At the April 11, 2012, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2014 DOE Oak Ridge Environmental Management Program budget request. Recommendation 209 (91.1 KB) DOE response to recommendation 209 (81.13 KB) More Documents & Publications Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request Recommendation

  5. Oak Ridge National Laboratory: Recent Accomplishments and Challenges in the Environmental Management Program

    Office of Environmental Management (EM)

    Oak Ridge National Laboratory Oak Ridge National Laboratory Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory | April 2013 Aerial View Oak Ridge National Laboratory (ORNL) conducts research and development to create scientific knowledge and solutions that strengthen the nation's leadership in key areas of science; increase the availability of clean, abundant energy; restore and protect the environment; and contribute to national security. ORNL also performs

  6. Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request | Department of

    Office of Environmental Management (EM)

    Energy 7: FY 2013 DOE Oak Ridge EM Budget Request Recommendation 197: FY 2013 DOE Oak Ridge EM Budget Request At the May 26, 2011, meeting, the Oak Ridge Site Specific Advisory Board approved the enclosed recommendations regarding the FY 2013 DOE Oak Ridge Environmental Management Program budget request. Recommendation 197 (181.59 KB) DOE response to recommendation 197 (18.48 KB) More Documents & Publications Recommendation 189: FY 2012 DOE Oak Ridge EM Budget Request Recommendation 168:

  7. CNS Joins Oak Ridge Chamber in Nashville | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Joins Oak Ridge Chamber ... CNS Joins Oak Ridge Chamber in Nashville Posted: April 13, 2016 - 12:25pm Tennessee Governor Bill Haslam (front row center) greets Oak Ridge business leaders during Oak Ridge Chamber of Commerce's Day on the Hill. Also pictured: (back row) Kelly Callison, Gene Patterson, Rick Chinn, Ben Andrews, (front row) Stacy Myers, Parker Hardy, Patricia Myers and Lisa Copeland. Consolidated Nuclear Security and other area businesses recently joined the Oak Ridge Chamber of

  8. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Wilson, R. C.; Lewis, K. K.

    1991-09-01

    This report presents data and information related to remedial investigation studies for Oak Ridge National Laboratory (ORNL). Information is included on a soil gas survey, surface radiological investigations of waste areas, and well installation for ground water monitoring. (CBS)

  9. Field Offfce, OakRidge P.0.B0x2001 Oak Ridge,Tennesree3793f-6723

    Office of Legacy Management (LM)

    .~.~. "- ..,- ,.._ .~. 1- ~,I -.. ._ .- -- Department of Energy Field Offfce, OakRidge P.0.B0x2001 Oak Ridge,Tennesree3793f-6723 'I ', April 20. 1993 Mr. William J. Condon Chief, Environmental Radiatfon Section Bureau of Environmental Radiation Protection New York State Department of Health 11 University Place Albany, New York 12203-3313 Dear Hr. Condon: BAKER ARD WILLIAM HAREHOUSES SITE - CORPLETION OF CLEANUP ACTIVITIES The purpose of this notice is to inform you about further scheduled

  10. INDEPENDENT VERIFICATION OF THE CENTRAL CAMPUS AND SOUTHEAST LABORATORY COMPLEX BUILDING SLABS AT OAK RIDGE NATIONAL LABORATORY, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Weaver, Phyllis C.

    2012-07-24

    Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education (ORAU/ORISE) has completed the independent verification survey of the Central Campus and Southeast Lab Complex Building Slabs. The results of this effort are provided. The objective of this verification survey was to provide independent review and field assessment of remediation actions conducted by SEC, and to independently assess whether the final radiological condition of the slabs met the release guidelines.

  11. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  12. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject.

  13. Oak Ridge, Tennessee, Warehouses Site Fact Sheet

    Office of Legacy Management (LM)

    ... After reviewing records and radiological surveys for more than 600 sites connected with the nuclear weapons program, DOE identifed 46 sites that required cleanup, including the Oak ...

  14. Oak Ridge Site Specific Advisory Board Committees

    Broader source: Energy.gov [DOE]

    Oak Ridge’s Site Specific Advisory Board uses its committee structure to achieve its mission and conduct many of its tasks.

  15. Californium Electrodepositions at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Boll, Rose Ann

    2015-01-01

    Electrodepositions of californium isotopes were successfully performed at Oak Ridge National Laboratory (ORNL) during the past year involving two different types of deposition solutions, ammonium acetate (NH4C2H3O2) and isobutanol ((CH3)2CHCH2OH). A californium product that was decay enriched in 251Cf was recovered for use in super-heavy element (SHE) research. This neutron-rich isotope, 251Cf, provides target material for SHE research for the potential discovery of heavier isotopes of Z=118. The californium material was recovered from aged 252Cf neutron sources in storage at ORNL. These sources have decayed for over 30 years, thus providing material with a very high 251Cf-to-252Cf ratio. After the source capsules were opened, the californium was purified and then electrodeposited using the isobutanol method onto thin titanium foils for use in an accelerator at the Joint Institute for Nuclear Research in Dubna, Russia. Another deposition method, ammonium acetate, was used to produce a deposition containing 1.7 0.1 Ci of 252Cf onto a stainless steel substrate. This was the largest single electrodeposition of 252Cf ever prepared. The 252Cf material was initially purified using traditional ion exchange media, such as AG50-AHIB and AG50-HCl, and further purified using a TEVA-NH4SCN system to remove any lanthanides, resulting in the recovery of 3.6 0.1 mg of purified 252Cf. The ammonium acetate deposition was run with a current of 1.0 amp, resulting in a 91.5% deposition yield. Purification and handling of the highly radioactive californium material created additional challenges in the production of these sources.

  16. Level 3 Baseline Risk Assessment for Building 3515 at Oak Ridge National Lab., Oak Ridge, TN

    SciTech Connect (OSTI)

    Wollert, D.A.; Cretella, F.M.; Golden, K.M.

    1995-08-01

    The baseline risk assessment for the Fission Product Pilot Plant (Building 3515) at the Oak Ridge National laboratory (ORNL) provides the Decontamination and Decommissioning (D&D) Program at ORNL and Building 3515 project managers with information concerning the results of the Level 3 baseline risk assessment performed for this building. The document was prepared under Work Breakdown Structure 1.4.12.6.2.01 (Activity Data Sheet 3701, Facilities D&D) and includes information on the potential long-term impacts to human health and the environment if no action is taken to remediate Building 3515. Information provided in this document forms the basis for the development of remedial alternatives and the no-action risk portion of the Engineering Evaluation/Cost Analysis report.

  17. Survey of protected vascular plants on the Oak Ridge Reservation, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Awl, D.J.; Pounds, L.R.; Rosensteel, B.A.; King, A.L.; Hamlett, P.A.

    1996-06-01

    Vascular plant surveys were initiated during fiscal year 1992 by the environmentally sensitive areas program to determine the baseline condition of threatened and endangered (T&E) vascular plant species on the Oak Ridge Reservation (ORR). T&E species receive protection under federal and state regulations. In addition, the National Environmental Policy Act (NEPA) requires that federally-funded projects avoid or mitigate impacts to listed species. T&E plant species found on or near the U.S. Department of Energy`s (DOE) Oak Ridge Reservation (ORR) are identified. Twenty-eight species identified on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these have been under review by the U.S. Fish and Wildlife Service for possible listing (listed in the formerly-used C2 candidate category). Additional species listed by the state occur near and may be present on the ORR. A range of habitats support the rare taxa on the ORR: river bluffs, sinkholes, calcareous barrens, wetlands, utility corridors, and forests. The list of T&E plant species and their locations on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated. The purpose of this document is to present information on the listed T&E plant species currently known to occur on the ORR as well as listed species potentially occurring on the ORR based on geographic range and habitat availability. For the purpose of this report, {open_quotes}T&E species{close_quotes} include all federal- and state-listed species, including candidates for listing, and species of special concern. Consideration of T&E plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival.

  18. Oak Ridge Removes Laboratory’s Greatest Source of Groundwater Contamination

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – This month, Oak Ridge’s EM program bid farewell to the last shipment of waste from the Tank W-1A project.

  19. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect (OSTI)

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as ``Whiteoak`` Creek).

  20. Hydrologic data summary for the White Oak Watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, October 1990--December 1991

    SciTech Connect (OSTI)

    Borders, D.M.; Gregory, S.M.; Clapp, R.B.; Frederick, B.J.; Watts, J.A.

    1992-06-01

    This report summarizes for the 15-month period of October 1990-- December 1991 the available dynamic hydrologic data collected, primarily on the White Oak Creek (WOC) watershed, along with information collected on the surface flow systems that affect the quality or quantity of surface water. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to: (1) characterize the quantity and quality of water in the flow systems; (2) assist with the planning and assessment of remedial action activities; and, (3) provide long-term availability of data and quality assurance. Characterization of the hydrology of the WOC watershed is critical for understanding the processes that drive contaminant transport in the watershed. Identification of spatial and temporal trends in hydrologic parameters and mechanisms that affect the movement of contaminants supports the development of interim corrective measures and remedial restoration alternatives. In addition, hydrologic monitoring supports long-term assessment of the effectiveness of remedial actions in limiting the transport of contaminants across Waste Area Grouping (WAG) boundaries and ultimately to the off-site environment. For these reasons, it is of paramount importance to the Environmental Restoration Program (ERP) to collect and report hydrologic data activities that contribute to the Site Investigations component of the ERP. (White Oak Creek is also referred to as Whiteoak'' Creek).

  1. Oak Ridge Site Specific Advisory Board

    Office of Environmental Management (EM)

    Ridge Reservation Please see the enclosed recommendation for complete details. We look forward to receiving your response to this recommendation by January 12, 2012. Sincerely,...

  2. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    Ridge Office of Environmental Management (OREM) East Tennessee Technology Park Portfolio Plan Jim Kopotic Portfolio Federal Project Director East Tennessee Technology Park...

  3. Contaminated scrap metal management on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Hayden, H.W.; Stephenson, M.J.; Bailey, J.K.; Weir, J.R.; Gilbert, W.C.

    1993-09-01

    Large quantities of scrap metal are accumulating at the various Department of Energy (DOE) installations across the country as a result of ongoing DOE programs and missions in concert with present day waste management practices. DOE Oak Ridge alone is presently storing around 500,000 tons of scrap metal. The local generation rate, currently estimated at 1,400 tons/yr, is expected to increase sharply over the next couple of years as numerous environmental restoration and decommissioning programs gain momentum. Projections show that 775,000 tons of scrap metal could be generated at the K-25 Site over the next ten years. The Y-12 Plant and Oak Ridge National Laboratory (ORNL) have similar potentials. The history of scrap metal management at Oak Ridge and future challenges and opportunities are discussed.

  4. The Oak Ridge Reservation Annual Site Environmental Report, 2007

    SciTech Connect (OSTI)

    Hughes, Joan; Thompson, Sharon; Page, David

    2008-09-30

    The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at Http://www.ornl.gov/sci/env_rpt or from the project director.

  5. Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS

    Office of Legacy Management (LM)

    -7 8,-7 C 7 I 2o.1-1o 1 ORAU 89/1-29 Prepared by VERIFICATION Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS ecommissioning ALBANY RESEARCH CENTER Pecommissioning Projects ALBANY, OREGON U.S. Department of Energy i P. R. COTTEN I I I I I I Environmental Survey and Site Assessment Program Energy/Environment Systems Division FINAL REPORT OCTOBER 1989 I I NOTICES The opinion. exprensed herin oo not n Hrily retect the opinions of the speparing institution of Oak Ridge Asoisetdl

  6. EM ARRA Best Practices and Lessons Learned Workshop: Oak Ridge

    Office of Environmental Management (EM)

    Learned Oak Ridge Presenter: Sue Cange EM ARRA BEST PRACTICES and LESSONS LEARNED WORKSHOP Waste Management Symposium Phoenix, AZ www.em.doe.gov 1 March 1, 2012 Oak Ridge Overview of Best Practice or Opportunity pp y Working closely together, the Y-12 Site M&O Contractor, the ORO Reservation disposal cell, DOE-EM, and the Regulators crafted a technically defensible, yet very cost effective characterization program in an effort to rapidly D&D two buildings that were part of the Y-12 ARRA

  7. Oak_Ridge_Site_By_The_Numbers_August_2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1942, the U.S. Army Corps of Engineers began acquiring land near Knoxville, Tennessee, for the Manhattan Project. This land became the 56,000-acre Oak Ridge site. By 1945, workers had com- pleted construction of the major facilities. K-25, S-50, and Y-12 plants were all built to separate the fissile isotope uranium-235 from uranium-238, while the X-10 site (present day Oak Ridge National Laboratory) was established as a pilot plant for the Graphite Reactor. Throughout the next six decades the

  8. Photo of the Week: Oak Ridge in 1945 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    to have a camera at the Oak Ridge site during the Manhattan Project and the Cold War. ... to have a camera at the Oak Ridge site during the Manhattan Project and the Cold War. ...

  9. REPORT OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN

    Office of Environmental Management (EM)

    OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of Oak Ridge Building 3597 ...

  10. Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finds Ways to Remove K-25 Faster, Cheaper Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper February 1, 2012 - 12:00pm Addthis Oak Ridge Finds Ways to Remove K-25 Faster, Cheaper ...

  11. A brief History of Neutron Scattering at the Oak Ridge High Flux...

    Office of Scientific and Technical Information (OSTI)

    A brief History of Neutron Scattering at the Oak Ridge High Flux Isotope Reactor Citation Details In-Document Search Title: A brief History of Neutron Scattering at the Oak Ridge ...

  12. Mr. Ron Murphree, Chair Oak Ridge Site-Specific Advisory Board

    Office of Environmental Management (EM)

    0 Mr. Ron Murphree, Chair Oak Ridge Site-Specific Advisory Board P.O. Box 2001, MS-7604 Oak Ridge, Tennessee 3783 1 Dear Mr. Murphree: Thank you for your recent letter providing a...

  13. Mr. Steve Dixon, Chair Oak Ridge Site Site-Specific Advisory...

    Office of Environmental Management (EM)

    0 6 2009 Mr. Steve Dixon, Chair Oak Ridge Site Site-Specific Advisory Boara P.O. Box 2001, MS-7604 Oak Ridge, Tennessee 3783 1 Dear Mr. Dixon: I have received your request for...

  14. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination...

    Office of Environmental Management (EM)

    DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September ...

  15. From Oak Ridge to the Moon (Y-12 Moon Box) | Y-12 National Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Oak Ridge to the Moon ... From Oak Ridge to the Moon (Y-12 Moon Box) The mp4 video format is not supported by this browser. Download video Captions: On Time: 5:26 min. Y-12...

  16. Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1998-01-01

    The Bear Creek Valley Floodplain Hot Spot Removal Action Project Plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (Y/ER-301) was prepared (1) to safely, cost-effectively, and efficiently evaluate the environmental impact of solid material in the two debris areas in the context of industrial land uses (as defined in the Bear Creek Valley Feasibility Study) to support the Engineering Evaluation/Cost Assessment and (2) to evaluate, define, and implement the actions to mitigate these impacts. This work was performed under Work Breakdown Structure 1.x.01.20.01.08.

  17. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for

  18. DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Processing Center Services | Department of Energy Oak Ridge Transuranic Waste Processing Center Services DOE Issues Final Request for Proposal for Oak Ridge Transuranic Waste Processing Center Services October 14, 2014 - 2:16pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for support services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak Ridge,

  19. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Broader source: Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  20. Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Material from Building 3019 | Department of Energy Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of Material from Building 3019 Uraninum-233 Inventory in Oak Ridge Lightened with First Shipment of Material from Building 3019 January 5, 2012 - 12:00pm Addthis OAK RIDGE, Tenn. - The first shipment of inventory from Building 3019 at the Oak Ridge National Laboratory arrived at the Nevada Nuclear Security Site (NNSS) on December 22, marking the beginning of the end for the

  1. ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Office | Department of Energy Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office ORO Verification of Employment Tracking System(VETS) PIA, Oak ridge Operations Office (72.39 KB) More Documents & Publications ORO Office Safeguards and Security Clearance Tracking System and

  2. PIA - Oak Ridge Institute for Science and Education Program Applicant and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Participant Status System (APSS) | Department of Energy Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) PIA - Oak Ridge Institute for Science and Education Program Applicant and Participant Status System (APSS) (251.67 KB) More

  3. CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Management in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  4. CRAD, Training- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  5. Oak Ridge Reservation’s emergency sectors change

    Broader source: Energy.gov [DOE]

    TEMA has issued revised emergency sectors for the DOE Oak Ridge Reservation. These sectors, labeled A-Y, determine which areas should take action if an event occurs at one of DOE’s sites locally. The new sector boundaries have improved correlation with roads, waterways, and recognizable landmarks.

  6. Oak Ridge Reservation. Physical Characteristics and National Resources

    SciTech Connect (OSTI)

    Parr, Patricia Dreyer; Joan, F. Hughes

    2006-10-09

    The topology, geology, hydrology, vegetation, and wildlife of the Oak Ridge Reservation (ORR) provide a complex and intricate array of resources that directly impact land stewardship and use decisions. The purpose of this document is to consolidate general information regarding the natural resources and physical characteristics of the ORR.

  7. Oak Ridge Reservation, annual site environmental report for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The US DOE currently oversees activities on the Oak Ridge Reservation, a government-owned, contractor-operated facility. Three sites compose the reservation; Y-12, Oak Ridge National Laboratory, and K-25. This document contains a summary of environmental monitoring activities on the Oak Ridge Reservation (ORR) and its surroundings. The results summarized in this report are based on the data collected during calendar year (CY) 1993 and compiled in; Environmental Monitoring in the Oak Ridge Reservation: CY 1993 Results. Annual environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is the collection and analysis of samples or measurements of liquid, gaseous, or airborne effluents for the purpose of characterizing and quantifying contaminants and process stream characteristics, assessing radiation and chemical exposures to members of the public, and demonstrating compliance with applicable standards. Environmental surveillance is the collection and analysis of samples of air, water, soil, foodstuffs, biota, and other media from DOE sites and their environs and the measurement of external radiation for purposes of demonstrating compliance with applicable standards, assessing radiation and chemical exposures to members of the public, and assessing effects, if any, on the local environment.

  8. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  9. CRAD, Training- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Training Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  10. CRAD, Management- Oak Ridge National Laboratory TRU ALPHA LLWT Project

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

  11. Area Lodging: Oak Ridge | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    37830 865.483.5615 (1.800.544.8313) fax 865.483.5615 1.7 miles from Y-12 DoubleTree Hotel 215 South Illinois Avenue Oak Ridge, TN 37830 865.481.2468; 1.800.222.8733...

  12. Environmental Compliance and Protection Program Description Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2009-02-26

    The objective of the Environmental Compliance and Protection (EC and P) Program Description (PD) is to establish minimum environmental compliance requirements and natural resources protection goals for the Bechtel Jacobs Company LLC (BJC) Oak Ridge Environmental Management Cleanup Contract (EMCC) Contract Number DE-AC05-98OR22700-M198. This PD establishes the work practices necessary to ensure protection of the environment during the performance of EMCC work activities on the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, by BJC employees and subcontractor personnel. Both BJC and subcontractor personnel are required to implement this PD. A majority of the decontamination and demolition (D and D) activities and media (e.g., soil and groundwater) remediation response actions at DOE sites on the ORR are conducted under the authority of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). CERCLA activities are governed by individual CERCLA decision documents (e.g., Record of Decision [ROD] or Action Memorandum) and according to requirements stated in the Federal Facility Agreement for the Oak Ridge Reservation (DOE 1992). Applicable or relevant and appropriate requirements (ARARs) for the selected remedy are the requirements for environmental remediation responses (e.g., removal actions and remedial actions) conducted under CERCLA.

  13. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  14. CRAD, Engineering- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Engineering Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  15. Oak Ridge Reservation Annual Site environmental report for 1994

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1995-10-01

    This report presents the details of the environmental monitoring and management plan for the Oak Ridge Reservation. Topics include: site and operations overview; environmental compliance strategies; environmental management program; effluent monitoring; environmental surveillance; radiation doses; chemical doses; ground water; and quality assurance.

  16. Technology Solutions Case Study: Foundation Heat Exchanger, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2014-03-01

    The foundation heat exchanger, developed by Oak Ridge National Laboratory, is a new concept for a cost-effective horizontal ground heat exchanger that can be connected to water-to-water or water-to-air heat pump systems for space conditioning as well as domestic water heating.

  17. Oak Ridge Reservation Annual Site Environmental Report Summary, 2004

    SciTech Connect (OSTI)

    Hughes, JF

    2005-11-30

    The Department of Energy (DOE) and our contractors strive to provide our stakeholders a comprehensive understanding of the consequences of DOE operations past and present. Toward this end a far-reaching multimillion-dollar annual monitoring and surveillance program collects and analyzes tens of thousands of air, surface and groundwater, soil, mud, plant, and animal samples. This effort represents the work of many dedicated environmental scientists who carry out these extensive programs and work hard to protect and enhance the environment. We publish the results in a detailed Annual Site Environmental Report (ASER), and a separate Data Volume for those who wish to see the supporting data. These documents present all the facts and figures, but are highly technical and not easily understood, and it's essential we provide a summary document simple to read and understand. So each year I team with Karns High School and ask students to write an Annual Site Environmental Report Summary that will be both informative and enjoyable to read. These environmental documents are perhaps the most important DOE reports because they explain the environmental monitoring programs and show the consequences of our operations in great detail to our legislatures, stakeholders, and the public. This ASER summary is written for you, the public, our most important stakeholder, with the hope that you find it comprehensible and of value in gaining an accurate understanding of the Oak Ridge Reservation. All three documents can be found on the web, along with previous publications, at http://www.ornl.gov/aser. It's a great pleasure to meet my new class each year and capture fresh creative ideas. I'm always delighted to see their interest and desire to learn and to produce a document for the public that reflects their personality and skills, and one the public will utilize and find of value. I sincerely thank these talented Karns High School students and their exceptional teacher, Mrs. Heather Bock

  18. Oak Ridge Hosts EM Site Specific Advisory Board Spring Chairs Meeting

    Broader source: Energy.gov [DOE]

    Oak Ridge, Tenn. – More than 60 participants from across the country traveled to Oak Ridge this month to attend the EM Site Specific Advisory Board’s (SSAB) 2016 Spring Chairs Meeting. The event was hosted by the Oak Ridge Site Specific Advisory Board (ORSSAB).

  19. Federal-Contractor Partnership Allows Continued Waste Processing in Oak Ridge

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM’s Oak Ridge Office of Environmental Management and two of its contractors — URS I CH2M Oak Ridge, LLC (UCOR) and Wastren Advantage, Inc. (WAI) — have developed a plan that allows the site to continue processing transuranic waste and maintain its cleanup schedule.

  20. Oak Ridge Dose Reconstruction annual report for calendar year 1997

    SciTech Connect (OSTI)

    1998-09-01

    Calendar year 1997 was the third full year of work on the Oak Ridge Dose Reconstruction. Activities are summarized on the following individual project tasks: Task 1 -- Investigation of radioiodine releases from X-10 radioactive lanthanum processing; Task 2 -- Investigation of mercury releases from Y-12 lithium enrichment; Task 3 -- Investigation of PCBs in the environment near Oak Ridge; Task 4 -- Investigation of radionuclides released from White Oak Creek to the Clinch River; Task 5 -- Systematic searching of records repositories; Task 6 -- Evaluation of the quality of uranium monitoring data and a screening evaluation of potential off-site health risks; and Task 7 -- Performance of screening for additional materials not evaluated in the feasibility study.

  1. Environmental Survey preliminary report, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1989-02-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy's (DOE) Oak Ridge Gaseous Diffusion Plant (ORGDP) conducted March 14 through 25, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental risk associated with ORGDP. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORGDP, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during is on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory (INEL). When completed, the results will be incorporated into the ORGDP Survey findings for in inclusion into the Environmental Survey Summary Report. 120 refs., 41 figs., 74 tabs.

  2. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.

  3. Removal site evaluation report for the Isotope Facilities at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-07-01

    This removal site evaluation (RmSE) report of the Isotope Facilities at Oak Ridge National Laboratory (ORNL) was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around the Isotopes Facility pose a substantial risk to human health or the environment and if remedial site evaluations (RSEs) or removal actions are required. The scope of the project included: (1) a review of historical evidence regarding operations and use of the facility; (2) interviews with facility personnel concerning current and past operating practices; (3) a site inspection; and (4) identification of hazard areas requiring maintenance, removal, or remedial actions. The results of RmSE indicate that no substantial risks exist from contaminants present in the Isotope Facilities because adequate controls and practices exist to protect human health and the environment. The recommended correction from the RmSE are being conducted as maintenance actions; accordingly, this RmSE is considered complete and terminated.

  4. 3001 canal radiological characterization and waste removal report, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Ritchie, M.G.

    1996-12-01

    An underground steel reinforced concrete transfer and storage canal was built in 1943 and operated as an integral part of the Oak Ridge Graphite Reactor Building (3001) until 1963 when the reactor was shutdown. During operation, the canal was used for under water transfer of irradiated materials and other metals from the reactor in Building 3001 to the Building 3019 hot cell for further processing. After shutdown of the reactor, the canal was used for storage of irradiated materials and fission products until 1990 when the larger materials were removed and stored in the Department of Energy (DOE) approved solid waste management storage facilities. At that time it was discovered that a considerable amount of sludge had accumulated over the intervening years and subsequent analysis showed that the sludge contained Resource Conservation and Recovery Act (RCRA) materials that violated quantities allowed by the RCRA regulations. It was also recognized in 1990 that the canal was losing water to evaporation and the ground at the rate of approximately 400 gallons per day. To maintain water quality; i.e., radionuclide content at or near DOE derived concentration guidelines (DCG), the water in the canal is constantly demineralized using a demineralizer in the Building 3001 and demineralized make up water is supplied from the Building 3004 demineralizer. This report summarizes the 301 Canal Cleanup Task and the solid waste removed from the 3001 Canal in 1996.

  5. Site characterization report for the Old Hydrofracture Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-01-01

    Several Old Hydrofracture Facility (OHF) structures (i.e., Building 7852, the bulk storage bins, the pump house, water tank T-5, and pump P-3) are surplus facilities at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D and D). OHF was constructed in 1963 to allow experimentation and operations with an integrated solids storage, handling, mixing, and grout injection facility. It was shut down in 1980 and transferred to ORNL`s Surveillance and Maintenance Program. The hydrofracture process was a unique disposal method that involved injecting waste materials mixed with grout and additives under pumping pressures of 2,000 psi or greater into a deep, low-permeability shale formation. The injected slurry spread along fractures and bedding planes for hundreds of feet from the injection points, forming thin grout sheets (often less than 1/8 in. thick). The grout ostensibly immobilized and solidified the liquid wastes. Site characterization activities were conducted in the winter and spring of 1994 to collect information necessary to plan the D and D of OHF structures. This site characterization report documents the results of the investigation of OHF D and D structures, presenting data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate. 25 refs., 54 figs., 17 tabs.

  6. Environmental Survey preliminary report, Oak Ridge National Laboratory (X-10), Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1988-07-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL), X-10 site, conducted August 17 through September 4, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with ORNL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at ORNL, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for ORNL. The Interim Report will reflect the final determinations of the ORNL Survey. 120 refs., 68 figs., 71 tabs.

  7. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ``closure`` in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document.

  8. Site characterization plan for groundwater in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Lee, R.R.; Curtis, A.H.; Houlberg, L.M.; Purucker, S.T.; Singer, M.L.; Tardiff, M.F.; Wolf, D.A.

    1994-07-01

    The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization to identify environmental contamination that may be present. This document, Site Characterization Report for Groundwater in Waste Area Grouping I at Oak Ridge National Laboratory, Oak Ridge, Tennessee, identifies areas of concern with respect to WAG 1 groundwater and presents the rationale, justification, and objectives for conducting this continuing site characterization. This report summarizes the operations that have taken place at each of the areas of concern in WAG 1, summarizes previous characterization studies that have been performed, presents interpretations of previously collected data and information, identifies contaminants of concern, and presents an action plan for further site investigations and early actions that will lead to identification of contaminant sources, their major groundwater pathways, and reduced off-site migration of contaminated groundwater to surface water. Site characterization Activities performed to date at WAG I have indicated that groundwater contamination, principally radiological contamination, is widespread. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to an unknown extent. The general absence of radiological contamination in surface water at the perimeter of WAG 1 is attributed to the presence of pipelines and underground waste storage tank sumps and dry wells distributed throughout WAG 1 which remove more than about 40 million gal of contaminated groundwater per year.

  9. Remedial Investigation Work Plan for Chestnut Ridge Operable Unit 1 (Chestnut Ridge Security Pits) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This document outlines the activities necessary to conduct a Remedial Investigation (RI) of the Chestnut Ridge Security Pits (CRSP) at the Oak Ridge Y-12 Plant. The CRSP, also designated Chestnut Ridge Operable Unit (OU) 1, is one of four OUs along Chestnut Ridge on the Oak Ridge Reservation (ORR). The purpose of the RI is to collect data to (1) evaluate the nature and extent of known and suspected contaminants, (2) support an Ecological Risk Assessment (ERA) and a Human Health Risk Assessment (HHRA), (3) support the feasibility study in the development and analysis of remedial alternatives, and (4) ultimately, develop a Record of Decision (ROD) for the site. This chapter summarizes the regulatory background of environmental investigation on the ORR and the approach currently being followed and provides an overview of the RI to be conducted at the CRSP. Subsequent chapters provide details on site history, sampling activities, procedures and methods, quality assurance (QA), health and safety, and waste management related to the RI.

  10. White Oak Creek watershed: Melton Valley area Remedial Investigation report, at the Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 2, Appendixes A and B

    SciTech Connect (OSTI)

    1996-11-01

    This document contains Appendixes A ``Source Inventory Information for the Subbasins Evaluated for the White Oak Creek Watershed`` and B ``Human Health Risk Assessment for White Oak Creek / Melton Valley Area`` for the remedial investigation report for the White Oak Creek Watershed and Melton Valley Area. Appendix A identifies the waste types and contaminants for each subbasin in addition to the disposal methods. Appendix B identifies potential human health risks and hazards that may result from contaminants present in the different media within Oak Ridge National Laboratory sites.

  11. Oak Ridge Director Thom Mason to lecture on "Big Science" at the

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Museum of Virginia | Jefferson Lab Oak Ridge Director Thom Mason to lecture on "Big Science" at the Science Museum of Virginia Oak Ridge Director Thom Mason to lecture on "Big Science" at the Science Museum of Virginia Oak Ridge Director Thom Mason Oak Ridge Director Thom Mason NEWPORT NEWS, VA - April 29, 2015 - The director of the world-renowned Oak Ridge National Laboratory will present a public lecture Sunday, May 3 on the impact of "Big Science" on

  12. Oak Ridge National Laboratory Site Office CX Determinations | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Low-Cost Carbon Fiber Process | Department of Energy Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process March 23, 2016 - 12:46pm Addthis News release from Oak Ridge National Laboratory. OAK RIDGE, Tenn., March 22, 2016 - Researchers at the Department of Energy's Oak Ridge National Laboratory (ORNL) have demonstrated a production method they estimate

  13. DOE Awards $6.3 Billion Contract Extension for Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy $6.3 Billion Contract Extension for Oak Ridge National Laboratory DOE Awards $6.3 Billion Contract Extension for Oak Ridge National Laboratory December 1, 2005 - 4:28pm Addthis OAK RIDGE, TENN. -- The U.S. Department of Energy has awarded a five-year, $6.3 billion extension to its current management and operating contractor, UT-Battelle, LLC, for the continued operation of the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tenn., the Department's Under

  14. Oak Ridge National Laboratory Seeking U.S. Manufacturers to License

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low-Cost Carbon Fiber Process | Department of Energy Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process March 23, 2016 - 12:46pm Addthis News release from Oak Ridge National Laboratory. OAK RIDGE, Tenn., March 22, 2016 - Researchers at the Department of Energy's Oak Ridge National Laboratory (ORNL) have demonstrated a production method they estimate

  15. Technology study of Gunite tank sludge mobilization at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    DeVore, J.R.; Herrick, T.J.; Lott, K.E.

    1994-12-01

    The Oak Ridge National Laboratory (ORNL) Gunite Tank Sludge Mobilization Technology Study was initiated to support the Gunite Tank Treatability Study effort. The technology study surveyed the methods and technologies available for tank cleaning and sludge mobilization in a radioactive environment. Technologies were identified and considered for applicability to the Gunite and Associated Tanks (GAAT) problems. These were then either accepted for further study or rejected as not applicable. Technologies deemed applicable to the GAAT sludge removal project were grouped for evaluation according to (1) deployment method, (2) types of remotely operated end effector equipment applicable to removal of sludge, (3) methods for removing wastes from the tanks, and (4) methods for concrete removal. There were three major groups of deployment technologies: ``past practice`` technologies, mechanical arm-based technologies, and vehicle-based technologies. The different technologies were then combined into logical sequences of deployment platform, problem, end effector, conveyance, post-removal treatment required (if any), and disposition of the waste. Many waste removal options are available, but the best technology in one set of circumstances at one site might not be the best type to use at a different site. No single technology is capable of treating the entire spectrum of wastes that will be encountered in GAAT. None of the systems used in other industries appears to be suitable, primarily because of the nature of the sludges in the GAAT Operable Unit (OU), their radiation levels, and tank geometries. Other commercial technologies were investigated but rejected because the authors did not believe them to be applicable.

  16. Oak Ridge Moves Forward in Mercury Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup March 28, 2013 - 12:00pm Addthis Workers recently removed five large mercury-contaminated tanks from Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Workers recently removed five large mercury-contaminated

  17. Recommendation 199: Recommendation to Remove Uncontaminated Areas of the Oak Ridge Reservation from the National Priorities List

    Broader source: Energy.gov [DOE]

    ORSSAB Recommends DOE Remove Uncontaminated Areas of the Oak Ridge Reservation from the National Priorities List.

  18. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates envirorunental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. This volume, Volume 2, contains logic diagrams with an index. Volume 3 has been divided into two separate volumes to facilitate handling and use.

  19. Oak Ridge Site Specific Advisory Board 2016 Annual Planning Meeting

    Office of Environmental Management (EM)

    2016 Annual Planning Meeting T r e m o n t L o d g e & R e s o r t 7 7 2 6 E . L a m a r A l e x a n d e r P a r k w a y T o w n s e n d , T e n n e s s e e The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup

  20. Performance assessment experience at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Lee, D.W.

    1994-12-31

    The development of a performance assessment (PA) for low-level radioactive waste disposal operations at Oak Ridge National Laboratory (ORNL) was initiated in 1989 and is continuing. A draft PA was prepared in September 1990 and submitted to the DOE Peer Review Panel for review and comment. Recommendations were received that formed the basis for a revised PA that was completed in December 1993. The review of the revised PA is continuing. This paper reviews the experience gained in the preparation of the PA including the technical difficulties associated with performance assessment in Oak Ridge and an overview of the methods used in the PA. Changes in waste operations that resulted from the findings in the PA include improved waste acceptance criteria, waste certification, and waste management practices. The discussion includes issues that relate to the application of current performance objectives to older disposal facilities, which are being addressed as part of the CERCLA process.

  1. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This report is part A of Volume 3 concerning characterization, decontamination, and dismantlement.

  2. Status report: A hydrologic framework for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Solomon, D.K.; Toran, L.E.; Dreier, R.B.; Moore, G.K.; McMaster, W.M.

    1992-05-01

    This first status report on the Hydrologic Studies Task of the Oak Ridge Reservation Hydrology and Geology Study (ORRHAGS) revises earlier concepts of subsurface hydrology and hydrogeochemistry of the ORR. A new classification of hydrogeologic units is given, as well as new interpretations of the gydrogeologic properties and processes that influence contaminant migration. The conceptual hydrologic framework introduced in this report is based primarily on reinterpretations of data acquired during earlier hydrologic investigations of waste areas at and near the three US Department of Energy Oak Ridge (DOE-OR) plant facilities. In addition to describing and interpreting the properties and processes of the groundwater systems as they are presently understood, this report describes surface water-subsurface water relations, influences on contaminant migration,and implications to environmental restoration, environmental monitoring, and waste management.

  3. Native Grass Community Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Ryon, Michael G; Parr, Patricia Dreyer; Cohen, Kari

    2007-06-01

    Land managers at the Department of Energy's Oak Ridge National Laboratory in East Tennessee are restoring native warm-season grasses and wildflowers to various sites across the Oak Ridge Reservation (ORR). Some of the numerous benefits to planting native grasses and forbs include improved habitat quality for wildlife, improved aesthetic values, lower long-term maintenance costs, and compliance with Executive Order 13112 (Clinton 1999). Challenges to restoring native plants on the ORR include the need to gain experience in establishing and maintaining these communities and the potentially greater up-front costs of getting native grasses established. The goals of the native grass program are generally outlined on a fiscal-year basis. An overview of some of the issues associated with the successful and cost-effective establishment and maintenance of native grass and wildflower stands on the ORR is presented in this report.

  4. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    SciTech Connect (OSTI)

    Thompson, Sharon D.

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  5. Oak Ridge Reservation annual site environmental report for 2008

    SciTech Connect (OSTI)

    none,

    2009-09-01

    The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at http://www.ornl.gov/sci/env_rpt or from the project director. This document is prepared annually to summarize environmental activities, primarily environmental monitoring activities, on the Oak Ridge Reservation (ORR) and within the ORR surroundings. The document fulfills the requirement of Department of Energy (DOE) Order 231.1A, Environment, Safety and Health Reporting, for an annual summary of environmental data to characterize environmental performance. The environmental monitoring criteria are described in DOE Order 450.1A, Environmental Protection Program. The results summarized in this report are based on data collected prior to and through 2008. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration/remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Corrections to the report for the previous year are found in Appendix

  6. Oak Ridge's EM Program Unplugs Former Electrical Switchyard | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy EM Program Unplugs Former Electrical Switchyard Oak Ridge's EM Program Unplugs Former Electrical Switchyard April 14, 2016 - 12:50pm Addthis A worker surveys the switchyard before electrical equipment is taken down as part of demolition and cleanup at the East Tennessee Technology Park. A worker surveys the switchyard before electrical equipment is taken down as part of demolition and cleanup at the East Tennessee Technology Park. The switchyard was constructed in 1944. The

  7. Oak Ridge National Laboratory Technologies Available for Licensing - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal ORNL Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Oak Ridge National Laboratory Technologies Available for

  8. Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001

    SciTech Connect (OSTI)

    1995-12-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

  9. Oak Ridge National Laboratory Analysis of Waste Isolation Pilot Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Samples: Integrated Summary Report | Department of Energy Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report Oak Ridge National Laboratory Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a

  10. Oak Ridge National Laboratory Evaluation for Drum Characterization and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Source Term Report | Department of Energy Evaluation for Drum Characterization and Source Term Report Oak Ridge National Laboratory Evaluation for Drum Characterization and Source Term Report This document was used to determine facts and conditions during the Department of Energy Accident Investigation Board's investigation into the radiological release event at the Waste Isolation Pilot Plant. The Technical Assessment Team (TAT) has undertaken a deliberative investigation process to

  11. High Performance Computing at the Oak Ridge Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High Performance Computing at the Oak Ridge Leadership Computing Facility Go to Menu Page 2 Outline * Our Mission * Computer Systems: Present, Past, Future * Challenges Along the Way * Resources for Users Go to Menu Page 3 Our Mission Go to Menu Page 4 * World's most powerful computing facility * Nation's largest concentration of open source materials research * $1.3B budget * 4,250 employees * 3,900 research guests annually * $350 million invested in modernization * Nation's most diverse energy

  12. Oak Ridge National Laboratory Review. Volume 25, No. 1, 1992

    SciTech Connect (OSTI)

    Krause, C.; Pearce, J.; Zucker, A.

    1992-10-01

    This report presents brief descriptions of the following programs at Oak Ridge National Laboratory: The effects of pollution and climate change on forests; automation to improve the safety and efficiency of rearming battle tanks; new technologies for DNA sequencing; ORNL probes the human genome; ORNL as a supercomputer research center; paving the way to superconcrete made with polystyrene; a new look at supercritical water used in waste treatment; and small mammals as environmental monitors.

  13. Oak Ridge Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Office of Environmental Management OREM supports local program fostering the next generation of environmental stewards OREM supports local program fostering the next generation of environmental stewards OREM and CRESO hosted media for a "turtle hunt" of Tennessee's state reptile, the Eastern Box Turtle. Today's event is just one example of how community partnerships are having a real-world impact, enabling Anderson County middle and high school students to participate in and

  14. Remedial investigation report on Waste Area Group 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 1: Technical summary

    SciTech Connect (OSTI)

    1995-03-01

    A remedial investigation (RI) was performed to support environmental restoration activities for Waste Area Grouping (WAG) 5 at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The WAG 5 RI made use of the observational approach, which concentrates on collecting only information needed to assess site risks and support future cleanup work. This information was interpreted and is presented using the framework of the site conceptual model, which relates contaminant sources and release mechanisms to migration pathways and exposure points that are keyed to current and future environmental risks for both human and ecological receptors. The site conceptual model forms the basis of the WAG 5 remedial action strategy and remedial action objectives. The RI provided the data necessary to verify this model and allows recommendations to be made to accomplish those objectives.

  15. Environmental baseline survey report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge and parcel 21D in the vicinity of the East Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    King, David A.

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy?s (DOE?s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only no-further-investigation (NFI) reports. Groundwater sampling was also conducted to support a Parcel 21d decision. Based on available data West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, and West Pine Ridge are not impacted by site operations and are not subject to actions per the Federal Facility Agreement (FFA). This determination is supported by visual inspections, records searches and interviews, groundwater conceptual modeling, approved NFI reports, analytical data, and risk analysis results. Parcel 21d data, however, demonstrate impacts from site

  16. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU's) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment and baseline human health evaluation including a toxicity assessment, and a baseline environmental evaluation.

  17. RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU'S) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment from doses to humans and animals and associated cancer risks, exposure via food chains, and historical data. (CBS)

  18. Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-01-01

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works.

  19. EIS-0110: Central Waste Disposal Facility for Low-Level Radioactive Waste, Oak Ridge Reservation, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EIS assessed the environmental impacts of alternatives for the disposal of low-level waste and by-product materials generated by the three major plants on the Oak Ridge Reservation (ORR). In addition to the no-action alternative, two classes of alternatives were evaluated: facility design alternatives and siting alternatives. This project was cancelled after the Draft Environmental Impact Statement was issued.

  20. Results of 1995 characterization of Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1996-02-01

    This technical memorandum (TM) documents the 1995 characterization of eight underground radioactive waste tanks at Oak Ridge National Laboratory (ORNL). These tanks belong to the Gunite and Associated Tanks (GAAT) operable unit, and the characterization is part of the ongoing GAAT remedial investigation/feasibility study (RI/FS) process. This TM reports both field observations and analytical results; analytical results are also available from the Oak Ridge Environmental Information System (OREIS) data base under the project name GAAT (PROJ-NAME = GAAT). This characterization effort (Phase II) was a follow-up to the {open_quotes}Phase I{close_quotes} sampling campaign reported in Results of Fall 1994 Sampling of Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee, ORNL/ER/Sub/87-99053/74, June 1995. The information contained here should be used in conjunction with that in the previous TM. The sampling plan is documented in ORNL Inactive Waste Tanks Sampling and Analysis Plan, ORNL/RAP/LTR-88/24, dated April 1988, as amended by Addendum 1, Revision 2: ORNL Inactive Tanks Sampling and Analysis Plan, DOE/OR/02-1354&D2, dated February 1995. Field team instructions are found in ORNL RI/FS Project Field Work Guides 01-WG-20, Field Work Guide for Sampling of Gunite and Associated Tanks, and 01-WG-21, Field Work Guide for Tank Characterization System Operations at ORNL. The field effort was conducted under the programmatic and procedural umbrella of the ORNL RI/FS Program, and the analysis was in accordance with ORNL Chemical and Analytical Sciences Division (CASD) procedures. The characterization campaign is intended to provide data for criticality safety, engineering design, and waste management as they apply to the GAAT treatability study and remediation. The Department of Energy (DOE) Carlsbad office was interested in results of this sampling campaign and provided funding for certain additional sample collection and analysis.

  1. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  2. Dr. Thomas Mason Laboratory Director UT-Battelle, LLC 1201 Oak Ridge Turnpike

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3, 2016 Dr. Thomas Mason Laboratory Director UT-Battelle, LLC 1201 Oak Ridge Turnpike Suite 100 Oak Ridge, Tennessee 37830 WEL-2016-03 Dear Dr. Mason: The Office of Enterprise Assessments' Office of Enforcement has completed an evaluation into the facts and circumstances associated with a January 13, 2016, event in which employees were exposed to elevated levels of ozone at the headworks building of the sewage treatment plant at the Oak Ridge National Laboratory (ORNL). Inhalation of ozone at

  3. Energy Department, Oak Ridge National Lab Officials to Celebrate First of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Kind Carbon Fiber Facility | Department of Energy Department, Oak Ridge National Lab Officials to Celebrate First of its Kind Carbon Fiber Facility Energy Department, Oak Ridge National Lab Officials to Celebrate First of its Kind Carbon Fiber Facility March 25, 2013 - 9:51am Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - On Tuesday, March 26, 2013, U.S. Assistant Secretary for Energy Efficiency and Renewable Energy David Danielson, Oak Ridge National Laboratory Director Thom

  4. Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy RoHAWKtics at Oak Ridge National Laboratory Photo of the Week: RoHAWKtics at Oak Ridge National Laboratory April 1, 2013 - 3:40pm Addthis Tennessee Governor Bill Haslam signs the robot of Hardin Valley Academy's FIRST robotics team during the dedication of DOE's Carbon Fiber Technology Facility, located at Oak Ridge National Laboratory. The RoHAWKtics team (named after their school mascot) spent an intense six weeks constructing the robot, using design, engineering, and

  5. 2013 Federal Energy and Water Management Award Winner Oak Ridge National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratory | Department of Energy 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory 2013 Federal Energy and Water Management Award Winner Oak Ridge National Laboratory Poster showing the 2013 Federal Energy and Water Management award winner, Oak Ridge National Laboratory. High Resolution Poster (3.58 MB) Low Resolution Poster (708.34 KB) More Documents & Publications An Approach to Sustainability that Improves Environmental and Safety Performance

  6. 2016 Annual Workforce Analysis and Staffing Plan Report - DOE Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (4193) United States Government Department of Energy Oak Ridge Office of Environmental Management memorandum DATE: January 19, 2016 REPLY TO ATTN OF: EM-90:Cange SUBJECT: 2015 OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT ANNUAL WORKFORCE ANALYSIS AND STAFFING PLAN TO: Karen L. Boardman, Chairperson, Federal Technical Capability Panel, HS-70 The Oak Ridge Office of Environmental Management (OREM) has produced the required OREM Annual Workforce Analysis and Staffing Plan. The attached report

  7. DOE - Office of Legacy Management -- Oak Ridge Gaseous Diffusion Plant - TN

    Office of Legacy Management (LM)

    02 Oak Ridge Gaseous Diffusion Plant - TN 02 FUSRAP Considered Sites Site: Oak Ridge Gaseous Diffusion Plant (TN.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.mbe.doe.gov/me70/manhattan/come_through.htm Documents Related to Oak Ridge Gaseous Diffusion Plant

  8. Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory INS-O-13-05 September 2013 Department of Energy Washington, DC 20585 September 16, 2013 MEMORANDUM FOR THE MANAGER, OAK RIDGE NATIONAL LABORATORY SITE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Unclassified Foreign National Visits and Assignments at Oak Ridge National Laboratory" BACKGROUND In support

  9. Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resourses Management Division | Department of Energy SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division Oak Ridge Office SharePoint( MicrosoftSHarePointServer) PIA, Information Resourses Management Division (81.87 KB) More Documents & Publications

  10. Enterprise Assessments, Oak Ridge National Laboratory Irradiated Fuels Examination Laboratory – April 2015

    Broader source: Energy.gov [DOE]

    Review of the Safety-Significant Ventilation Systems at the Irradiated Fuels Examination Laboratory Operated by UT-Battelle for the Oak Ridge National Laboratory Office of Science

  11. 2014 Annual Planning Summary for the Oak RIdge National Laboratory Site Office

    Broader source: Energy.gov [DOE]

    The Oak Ridge National Laboratory Site Office has determined that no new EAs or EISs are expected to commence during the next 12 to 24-month period.

  12. Clifton Truman Daniel's visit to Oak Ridge and Y-12, part 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 President Harry S. Truman's grandson, Clifton Truman Daniel, after visiting Japan to attend an anniversary of the bombing of Hiroshima and Nagasaki, recently visited Oak Ridge to...

  13. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    Recommendations on the FY 2017 DOE Oak Ridge ... Opportunities 4. Trip Report: Jennifer Kasten on 2015 Environmental Justice ... A. Next Meeting: Annual Planning Meeting, ...

  14. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  15. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    2 2 2 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts related to the Oak Ridge site, the Board seeks

  16. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... Adler - Mr. Adler reported on the status resuming shipments of uranium-233 from Oak Ridge National Laboratory to the Nevada National Security Site for disposal. Shipments have been ...

  17. Oak Ridge's K-27 Building Set for Demolition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge's K-27 Building Set for Demolition Oak Ridge's K-27 Building Set for Demolition December 29, 2015 - 1:05pm Addthis Workers remove transite panels from the K-27 Building. Workers remove transite panels from the K-27 Building. OAK RIDGE, Tenn. - The EM program in Oak Ridge is more than 96 percent complete with pre-demolition activities at the K-27 Building. While building demolition gets a lot of attention, it is only a small piece of what it takes to reduce risk and eliminate buildings

  18. Leadership Oak Ridge visits Y-12 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    potential and emerging leaders about Oak Ridge and its issues and provide them leadership skills development in order to empower them to identify and implement solutions to those...

  19. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Broader source: Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  20. Demonstration of DeconGel (TM) at the Oak Ridge National Laboratory...

    Broader source: Energy.gov (indexed) [DOE]

    Demonstration of DeconGelTM at the Oak Ridge National Laboratory Building 2026 (173.82 KB) More Documents & Publications CX-000884: Categorical Exclusion Determination OREM Hosts ...

  1. Warehouses in New York, New York To: J. LaGrone Manager Oak Ridge...

    Office of Legacy Management (LM)

    This expedited procedure requires close cooperation between Headquarters, Oak Ridge Operations, and involved contractors. This project will be the first demonstration of this ...

  2. Demonstration of DeconGelTM at the Oak Ridge National Laboratory...

    Office of Environmental Management (EM)

    Demonstration D&D Toolbox - ORNL Decontamination Agent Demonstration Demonstration of decontamination agent at ORNL Building 2026 Page 1 of 2 Oak Ridge National Laboratory ...

  3. Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2015 | Department of Energy URS | CH2M Oak Ridge LLC - April 2015 Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC - April 2015 April 2015 UCOR is admitted to the Department of Energy Voluntary Protection Program as a Star Participant. This report summarizes the results from the evaluation of URS | CH2M OAK RIDGE LLC (UCOR) in Oak Ridge, Tennessee during the period of April 14-23 2015, and provides the Associate Under Secretary for AU with the necessary information

  4. 2014 Annual Planning Summary for the Oak Ridge Office of Environmental Management

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Oak Ridge Office of Environmental Management.

  5. Oak Ridge Reservation annual site environmental report for 1996

    SciTech Connect (OSTI)

    1997-10-01

    The US Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. Three sites compose the reservation: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation`s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the US. Both the work carried out for the war effort and subsequent research, development, and production activities have produced (and continue to produce) radiological and hazardous wastes. This document contains a summary of environmental monitoring activities on the ORR and its surroundings. Environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents prior to release into the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; this provides direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data verify ORR`s compliance status and, combined with data from effluent monitoring, allow the determination of chemical and radiation dose/exposure assessment of ORR operations and effects, if any, on the local environment.

  6. Corrective action report for underground storage tank 2315-U, Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bohrman, D.E.; Ingram, E.M. )

    1992-11-01

    This document represents the Corrective Action Report for Underground Storage Tank (UST) 2315-U at the Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Tank 2315-U was a 64-gallon, asphalt-coated, steel gasoline tank used to supply gasoline to an emergency power generator at the repeater station. Due to its capacity, the tank was initially exempted from regulation under 40 CFR 280 and Tennessee Department of Environment and Conservation (TDEC) Rules 1200-1-15-.01 to 1200-1-15-.07. However, due to the presence of a free product sheen discovered during over-excavation activities, the site fell under the revised TDEC release response and corrective action requirements in Rule 1200-1-15-.06, promulgated April 15, 1990. This report summarizes all activities, including initial abatement, Initial Site Characterization (ISC), soil over-excavation activities, and perched water corrective actions conducted to comply with current TDEC requirements.

  7. Oak Ridge Reservation annual site environmental report for 1995

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1996-09-01

    This report presents the details of the environmental monitoring and management program for the Oak Ridge Reservation. Topics discussed include: site background, climate, and operations; environmental compliance strategies; effluent monitoring; environmental management program including environmental restoration, decontamination and decommissioning, technology development, and public involvement; effluent monitoring of airborne discharges, liquid discharges, toxicity control and monitoring, biological monitoring and abatement; environmental surveillance which encompasses meteorological monitoring, ambient air monitoring, surface water monitoring, soils monitoring, sediment monitoring, and contamination of food stuffs monitoring; radiation doses; chemical exposures; ground water monitoring; and quality assurance.

  8. Oak Ridge Reservation environmental report for 1992. Volume 1: Narrative

    SciTech Connect (OSTI)

    Koncinski, W.S.

    1993-09-01

    The two volumes of this report present data and supporting narratives regarding the impact of the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on its environs and the public during 1992. This Volume (Volume 1) includes all narrative descriptions, summaries, and conclusions and is intended to be a ``stand-alone`` report for the reader who does not want to review in detail all of the 1992 data for the ORR. Volume 2 includes the detailed data in formats that ensure all the environmental data are represented. Narratives are not included in Vol. 2.

  9. The Oak Ridge Competitive Electricity Dispatch (ORCED) Model

    SciTech Connect (OSTI)

    Hadley, Stanton W

    2008-06-01

    The Oak Ridge Competitive electricity Dispatch (ORCED) model has been used for multiple analyses of the impacts of different technologies and policies on the electricity grid. The model was developed over ten years ago and has been greatly enhanced since the initial documentation from June 1998 (ORNL/CON-464). The report gives guidance on the workflow and methodologies used, but does not provide a complete user's manual detailing steps necessary to operate the model. It lists the major resources used, shows the main inputs and outputs of the model, and describes how it can be used for a variety of analyses.

  10. Oak Ridge Site Specific Advisory Board Annual Meeting

    Office of Environmental Management (EM)

    Numbers in parentheses indicate minutes assigned to topic Oak Ridge Site Specific Advisory Board Annual Meeting Saturday, August 6, 2016 9:00 a.m. - 2:30 p.m. Tremont Lodge & Resort 7726 E. Lamar Alexander Pkwy, Townsend, TN OBJECTIVES 1. Develop an increased understanding of and commitment to the goals of the board 2. Evaluate the effectiveness and achievements of FY 2016 3. Begin development of the FY 2017 work plan AGENDA 9:00-9:05 .......... Welcome (5)*  Opening Remarks - Belinda

  11. Oak Ridge National Laboratory Southeast United States Bioenergy Study Tour

    Broader source: Energy.gov [DOE]

    Oak Ridge National Laboratory will be hosting a study tour of the southwestern United States from April 10–14, 2016. The tour will provide bioenergy sustainability researchers an opportunity to see cutting-edge field research supported by the U.S. Department of Energy’s (DOE’s) Bioenergy Technologies Office (BETO) firsthand. Invited researchers will come from DOE, the U.S. Department of Agriculture, the International Energy Agency, as well as from across academia, industry, and non-governmental organizations. BETO Feedstocks Program Manager Alison Goss Eng and Sustainability Technology Manager Kristen Johnson will be in attendance.

  12. Oak Ridge National Laboratory Review: Volume 24, No. 2, 1991

    SciTech Connect (OSTI)

    Krause, C.

    1991-12-31

    The Oak Ridge National Laboratory (ORNL) is a multiprogram, multipurpose laboratory that conducts research in the physical, chemical, and life sciences; in fusion, fission, and fossil energy; and in energy conservation and other energy-related technologies. This review outlines some current endeavors of the lab. A state of the laboratory presentation is given by director, Alvin Trivelpiece. Research of single crystals for welding is described. The Science Alliance, a partnership between ORNL and the University of Tennessee, is chronicled. And several incites into distinguished personnel at the laboratory are given. (GHH)

  13. Oak Ridge National Laboratory Review: Volume 24, No. 2, 1991

    SciTech Connect (OSTI)

    Krause, C.

    1991-01-01

    The Oak Ridge National Laboratory (ORNL) is a multiprogram, multipurpose laboratory that conducts research in the physical, chemical, and life sciences; in fusion, fission, and fossil energy; and in energy conservation and other energy-related technologies. This review outlines some current endeavors of the lab. A state of the laboratory presentation is given by director, Alvin Trivelpiece. Research of single crystals for welding is described. The Science Alliance, a partnership between ORNL and the University of Tennessee, is chronicled. And several incites into distinguished personnel at the laboratory are given. (GHH)

  14. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    ... The disposal areas are surface repositories. Oak Ridge sends low-level wastes to Nevada ... Ridge to test the methods for enriching uranium ORSSAB Meeting Minutes June 12, 2013 4 ...

  15. Waste Area Grouping 4 Site Investigation Sampling and Analysis Plan, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1994-12-01

    Waste Area Grouping (WAG) 4 is one of 17 WAGs within and associated with Oak Ridge National Laboratory (ORNL), on the Oak Ridge Reservation in Oak Ridge, Tennessee. WAG 4 is located along Lagoon Road south of the main facility at ORNL. WAG 4 is a shallow-waste burial site consisting of three separate areas: (1) Solid Waste Storage Area (SWSA) 4, a shallow-land burial ground containing radioactive and potentially hazardous wastes; (2) an experimental Pilot Pit Area, including a pilot-scale testing pit; and (3) sections of two abandoned underground pipelines formerly used for transporting liquid, low-level radioactive waste. In the 1950s, SWSA 4 received a variety of low-and high-activity wastes, including transuranic wastes, all buried in trenches and auger holes. Recent surface water data indicate that a significant amount of {sup 90}Sr is being released from the old burial trenches in SWSA 4. This release represents a significant portion of the ORNL off-site risk. In an effort to control the sources of the {sup 90}Sr release and to reduce the off-site risk, a site investigation is being implemented to locate the trenches containing the most prominent {sup 90}Sr sources. This investigation has been designed to gather site-specific data to confirm the locations of {sup 90}Sr sources responsible for most off-site releases, and to provide data to be used in evaluating potential interim remedial alternatives prepared to direct the site investigation of the SWSA 4 area at WAG 4.

  16. EIS-0305: Treating Transuranic (TRU)/Alpha Low-Level at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EIS evaluates DOE's proposal to construct, operate, and decontaminate/decommission a Transuranic (TRU) Waste Treatment Facility in Oak Ridge, Tennessee. The four waste types that would be treated at the proposed facility would be remote-handled TRU mixed waste sludge, liquid low-level waste associated with the sludge, contact-handled TRU/alpha low-level waste solids, and remote-handled TRU/alpha low-level waste solids. The mixed waste sludge and some of the solid waste contain metals regulated under the Resource Conservation and Recovery Act and may be classified as mixed waste.

  17. Oak Ridge Reservation Bird Records and Population Trends

    SciTech Connect (OSTI)

    Roy, W. K.; Giffen, N. R.; Wade, M. C.; Haines, A. M.; Evans, J. W.; Jett, R. T.

    2014-09-01

    Bird data have been collected through surveys, environmental assessments, and other observations for decades in the Oak Ridge National Environmental Research Park, located on the US Department of Energy’s Oak Ridge Reservation (ORR) in East Tennessee. Birds were recorded in a variety of habitats, including wetlands, interior forests, grasslands, ponds, corridors, forest edges, and more. Most of the information was gathered from waterfowl surveys conducted from 1990 to 2008, from Partners in Flight (PIF) breeding bird surveys conducted from 1995 to 2013, and from past publications and research on Reservation birds. We have also included our own observations and, in a few instances, credible observations of ORR birds of which we have been made aware through eBird or discussions with area ornithologists and bird watchers. For the period 1950-2014, we were able to document 228 species of birds on the ORR. Several of these species are known from historic records only, while others were not known to have ever occurred on the Reservation until recently. This report does not include PIF breeding bird data from the 2014 season or any records after July 2014. Twenty-two species--approximately 10% of the total number of species observed--have state-listed status in Tennessee as endangered, threatened, or in need of management. Of the 228 species we documented, 120 are believed to be breeding birds on the ORR.

  18. Oak Ridge Reservation Bird Records and Population Trends

    SciTech Connect (OSTI)

    Roy, W. Kelly; Giffen, Neil R.; Wade, Murray; Haines, Angelina; Evans, James W.; Jett, Robert Trent

    2014-11-01

    Bird data have been collected through surveys, environmental assessments, and other observations for decades in the Oak Ridge National Environmental Research Park, located on the US Department of Energy s Oak Ridge Reservation (ORR) in East Tennessee. Birds were recorded in a variety of habitats, including wetlands, interior forests, grasslands, ponds, corridors, forest edges, and more. Most of the information was gathered from waterfowl surveys conducted from 1990 to 2008, from Partners in Flight (PIF) breeding bird surveys conducted from 1995 to 2013, and from past publications and research on Reservation birds. We have also included our own observations and, in a few instances, credible observations of ORR birds of which we have been made aware through eBird or discussions with area ornithologists and bird watchers. For the period 1950 2014, we were able to document 228 species of birds on the ORR. Several of these species are known from historic records only, while others were not known to have ever occurred on the Reservation until recently. This report does not include PIF breeding bird data from the 2014 season or any records after July 2014. Twenty-two species approximately 10% of the total number of species observed have state-listed status in Tennessee as endangered, threatened, or in need of management. Of the 228 species we documented, 120 are believed to be breeding birds on the ORR.

  19. Wildlife Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Giffen, Neil R; Evans, James W.; Parr, Patricia Dreyer

    2007-10-01

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  20. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration and waste management problems at the Oak Ridge K-25 Site to potential technologies that can remediate these problems. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remedial action, and decontamination and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. This Volume, Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume is divided into ten chapters. The first chapter is a brief introduction, and the second chapter details the technical approach of the TLD. These categories are the work activities necessary for successful decontamination and decommissioning, waste management, and remedial action of the K-25 Site. The categories are characterization, decontamination, dismantlement, robotics and automation, remedial action, and waste management. Materials disposition is addressed in Chap. 9. The final chapter contains regulatory compliance information concerning waste management, remedial action, and decontamination and decommissioning.

  1. Oak Ridge National Laboratory Waste Management Plan. Revision 1

    SciTech Connect (OSTI)

    Forgy, Jr., J. R.

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  2. Oak Ridge K-25 Site Technology Logic Diagram

    SciTech Connect (OSTI)

    Fellows, R.L.

    1993-02-26

    The Oak Ridge K-25 Technology Logic Diagram (TLD), a decision support tool for the K-25 Site, was developed to provide a planning document that relates environmental restoration (ER) and waste management (WN) problems at the Oak Ridge K-25 Site. The TLD technique identifies the research necessary to develop these technologies to a state that allows for technology transfer and application to waste management, remediation, decontamination, and decommissioning activities. The TLD consists of four separate volumes-Vol. 1, Vol. 2, Vol. 3A, and Vol. 3B. Volume 1 provides introductory and overview information about the TLD. Volume 2 contains logic diagrams. Volume 3 has been divided into two separate volumes to facilitate handling and use. This volume 3 B provides the Technology Evaluation Data Sheets (TEDS) for ER/WM activities (Remedial Action Robotics and Automation, Waste Management) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than each technology in Vol. 2. The TEDS are arranged alphanumerically by the TEDS code number in the upper right corner of each data sheet. Volume 3 can be used in two ways: (1) technologies that are identified from Vol. 2 can be referenced directly in Vol. 3 by using the TEDS codes, and (2) technologies and general technology areas (alternatives) can be located in the index in the front of this volume.

  3. An Account of Oak Ridge National Laboratory's Thirteen Research Reactors

    SciTech Connect (OSTI)

    Rosenthal, Murray Wilford

    2009-08-01

    The Oak Ridge National Laboratory has built and operated 13 nuclear reactors in its 66-year history. The first was the graphite reactor, the world's first operational nuclear reactor, which served as a plutonium production pilot plant during World War II. It was followed by two aqueous-homogeneous reactors and two red-hot molten-salt reactors that were parts of power-reactor development programs and by eight others designed for research and radioisotope production. One of the eight was an all-metal fast burst reactor used for health physics studies. All of the others were light-water cooled and moderated, including the famous swimming-pool reactor that was copied dozens of times around the world. Two of the reactors were hoisted 200 feet into the air to study the shielding needs of proposed nuclear-powered aircraft. The final reactor, and the only one still operating today, is the High Flux Isotope Reactor (HFIR) that was built particularly for the production of californium and other heavy elements. With the world's highest flux and recent upgrades that include the addition of a cold neutron source, the 44-year-old HFIR continues to be a valuable tool for research and isotope production, attracting some 500 scientific visitors and guests to Oak Ridge each year. This report describes all of the reactors and their histories.

  4. Oak Ridge Institutional Cluster Autotune Test Drive Report

    SciTech Connect (OSTI)

    Jibonananda, Sanyal; New, Joshua Ryan

    2014-02-01

    The Oak Ridge Institutional Cluster (OIC) provides general purpose computational resources for the ORNL staff to run computation heavy jobs that are larger than desktop applications but do not quite require the scale and power of the Oak Ridge Leadership Computing Facility (OLCF). This report details the efforts made and conclusions derived in performing a short test drive of the cluster resources on Phase 5 of the OIC. EnergyPlus was used in the analysis as a candidate user program and the overall software environment was evaluated against anticipated challenges experienced with resources such as the shared memory-Nautilus (JICS) and Titan (OLCF). The OIC performed within reason and was found to be acceptable in the context of running EnergyPlus simulations. The number of cores per node and the availability of scratch space per node allow non-traditional desktop focused applications to leverage parallel ensemble execution. Although only individual runs of EnergyPlus were executed, the software environment on the OIC appeared suitable to run ensemble simulations with some modifications to the Autotune workflow. From a standpoint of general usability, the system supports common Linux libraries, compilers, standard job scheduling software (Torque/Moab), and the OpenMPI library (the only MPI library) for MPI communications. The file system is a Panasas file system which literature indicates to be an efficient file system.

  5. 2014 Oak Ridge Reservation Annual Site Environmental Report

    SciTech Connect (OSTI)

    Hughes, Joan F.

    2015-09-01

    The US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) is located in Roane and Anderson counties in East Tennessee, about 40 km (25 miles) from Knoxville. ORR is one of DOE’s most unique and complex sites. It encompasses three major facilities and thousands of employees that perform every mission in the DOE portfolio—energy research, environmental restoration, national security, nuclear fuel supply, reindustrialization, science education, basic and applied research in areas important to US security, and technology transfer. ORR was established in the early 1940s as part of the Manhattan Project for the purposes of enriching uranium and pioneering methods for producing and separating plutonium. Today, scientists at the Oak Ridge National Laboratory (ORNL), DOE’s largest multipurpose national laboratory, conduct world-leading research in advanced materials, alternative fuels, climate change, and supercomputing. The Y-12 National Security Complex (Y-12 or Y-12 Complex) is vital to maintaining the safety, security, and effectiveness of the US nuclear weapons stockpile and reducing the global threat posed by nuclear proliferation and terrorism. The East Tennessee Technology Park (ETTP), a former uranium enrichment complex, is being transitioned to a clean, revitalized industrial park.

  6. ENVIRONMENTAL BASELINE SURVEY REPORT FOR WEST BLACK OAK RIDGE, EAST BLACK OAK RIDGE, MCKINNEY RIDGE, WEST PINE RIDGE, AND PARCEL 21D IN THE VICINITY OF THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    David A. King

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI

  7. In-Process Analysis Program for the Isolock sampler at the Gunite and Associated Tanks, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    The In-Process Analysis Program documents the requirements for handling, transporting, and analyzing waste slurry samples gathered by the Bristol Isolock slurry sampler from the Gunite and Associated Tanks at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Composite samples will be gathered during sludge retrieval operations, labeled, transported to the appropriate laboratory, and analyzed for physical and radiological characteristics. Analysis results will be used to support occupational exposure issues, basic process control management issues, and prediction of radionuclide flow.

  8. Initial site characterization, environmental assessment, and corrective actions for underground storage tank 2315-U, Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Eaton, J.M.; Ingram, E.M. )

    1991-02-01

    This document presents the Initial Site Characterization Report and information to date regarding environmental assessment and corrective actions for Underground Storage Tank (UST) 2315-U at the Pine Ridge East Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This document was prepared following guidance in US Environmental Protection Agency (EPA) regulations promulgated under 40 CFR 280. The Pine Ridge East Repeater Station is located on Pine Ridge, which borders the Y-12 Plant to the north. One 64-gallon, asphalt-coated steel tank was located adjacent to the Repeater Station. This tank was used to store gasoline for the station's emergency power generator. Tank 2315-U was exempted from regulation under 40 CFR 280 and Tennessee Department of Health and Environment (TDHE) Rules 1200-1-15.-01 through 1200-1-15-.07 due to size and emergency generator exemptions. Because of an identified release discovered during initial corrective actions, TDHE requirements in revised Rule 1200-1-15-.06, promulgated April 15, 1990, regarding release response and corrective actions, apply to the site (TDHE, 1990). This report documents all activities, including initial abatement, initial site characterization, environmental assessment sampling, and corrective actions conducted to comply with TDHE regulations. Initial site characterization sampling data revealed that benzene, toluene, and xylene (BTX) concentrations exceeded applicable regulatory guidelines and lead values were elevated above levels expected for clean soils. 17 refs., 10 figs., 8 tabs.

  9. EIS-0084: Incineration Facility for Radioactively Contaminated PCBs and Other Wastes, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Office of Uranium Enrichment and Assessment prepared this statement to assess the environmental impacts of the construction and operation of the proposed Oak Ridge Gaseous Diffusion Plant, an incineration facility to dispose of radioactively contaminated polychlorinated biophenyls, as well as combustible waste from the Paducah, Portsmouth and Oak Ridge facilities.

  10. Oak Ridge Leadership Computing Facility (OLCF) | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) Oak Ridge Leadership Computing Facility (OLCF) Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities User Facilities Argonne Leadership Computing Facility (ALCF) Energy Sciences Network (ESnet) National Energy Research Scientific Computing Center (NERSC) Oak Ridge Leadership Computing Facility (OLCF) Accessing ASCR Facilities Computational Science Graduate Fellowship (CSGF) Research & Evaluation Prototypes (REP) Science Highlights Benefits of ASCR Funding

  11. Labs at-a-Glance: Oak Ridge National Laboratory | U.S. DOE Office of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science (SC) Oak Ridge National Laboratory Laboratories Laboratories Home Ames Laboratory Argonne National Laboratory Brookhaven National Laboratory Fermi National Accelerator Laboratory Lawrence Berkeley National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Princeton Plasma Physics Laboratory SLAC National Accelerator Laboratory Thomas Jefferson National Accelerator Facility Laboratory Science Highlights Laboratory News Contact Information Office of Science

  12. Oak Ridge EM Program Upgrades Environmental Database for Public’s Ease of Use

    Office of Energy Efficiency and Renewable Energy (EERE)

    OAK RIDGE, Tenn. – Oak Ridge is working to remediate contaminated areas in one of the EM program’s most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War.

  13. DOE Awards Contract for Oak Ridge Transuranic Waste Processing Center Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today announced the award of a contract to North Wind Solutions, LLC for waste processing services at the Oak Ridge Transuranic Waste Processing Center (TWPC) in Oak Ridge, Tennessee. Seven (7) proposals were received in response to the solicitation.

  14. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    2 2 2 , , , 2 2 2 0 0 0 1 1 1 4 4 4 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to ...

  15. Phase 1 report on the Bear Creek Valley treatability study, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-04-01

    Bear Creek Valley (BCV) is located within the US Department of Energy (DOE) Oak Ridge Reservation and encompasses multiple waste units containing hazardous and radioactive wastes associated with past operations at the adjacent Oak Ridge Y-12 Plant. The BCV Remedial Investigation determined that disposal of wastes at the S-3 Site, Boneyard/Burnyard (BYBY), and Bear Creek Burial Grounds (BCBG) has caused contamination of both deep and shallow groundwater. The primary contaminants include uranium, nitrate, and VOCs, although other metals such as aluminum, magnesium, and cadmium persist. The BCV feasibility study will describe several remedial options for this area, including both in situ and ex situ treatment of groundwater. This Treatability Study Phase 1 Report describes the results of preliminary screening of treatment technologies that may be applied within BCV. Four activities were undertaken in Phase 1: field characterization, laboratory screening of potential sorbents, laboratory testing of zero valent iron products, and field screening of three biological treatment systems. Each of these activities is described fully in technical memos attached in Appendices A through G.

  16. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  17. OAK RIDGE OPERATIONS P. 0. HOX E OAK RID~F'

    Office of Legacy Management (LM)

    N ,-, :; j L.j U?.!IT~D ,C,-r,QTES . . EI~:ERC~Y m3mm-i A~I D~.G~-OWENT ~n~~r~~s-rn~\?-r(,~~ OAK RIDGE OPERATIONS P. 0. HOX E OAK RID~F' C, TEVKESf,FE 37830 September 12, 1977 t?; H. Kennedy, Division of Environmental Control Technology, HQ, GTN. !qS E-201 REPORT OF FINDINGS - WESTINGHOUSE, BL00:1FIELD, NEW JERSEY E.REI\ C' iLJC (;I, ,E, Cd&r:,:.? .:%' BG, - On r3ctaber 21, 1976, Howard Dickson, ORI',IL, and I visited Westinghouse located at 1 Westinghouse Plaza, Bloomfield, New Jersey, to

  18. An inventory of wells of Oak Ridge National Laboratory 1992

    SciTech Connect (OSTI)

    Rush, R.M.; Gryder, R.K.; Baxter, F.P.

    1993-02-01

    The well inventory described in this report is a database of well information being developed for the Oak Ridge National Laboratory (ORNL) Groundwater Coordinator and the ORNL Groundwater Protection Program. Data are presented on 2071 ORNL wells as maps and as tabular data. A table of well identification aliases is given to permit correlation with earlier reports. Information is incomplete for many of the wells, and a form is provided for readers to provide missing or updated data. The goal of the developers of this data base is to produce a comprehensive inventory of wells at ORNL. This data base is being maintained to provide current information for the operational management of the ORNL groundwater monitoring system and for various users of groundwater data at ORNL.

  19. A History of Classified Activities at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Quist, A.S.

    2001-01-30

    The facilities that became Oak Ridge National Laboratory (ORNL) were created in 1943 during the United States' super-secret World War II project to construct an atomic bomb (the Manhattan Project). During World War II and for several years thereafter, essentially all ORNL activities were classified. Now, in 2000, essentially all ORNL activities are unclassified. The major purpose of this report is to provide a brief history of ORNL's major classified activities from 1943 until the present (September 2000). This report is expected to be useful to the ORNL Classification Officer and to ORNL's Authorized Derivative Classifiers and Authorized Derivative Declassifiers in their classification review of ORNL documents, especially those documents that date from the 1940s and 1950s.

  20. Waste Reduction plan for Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    Oak Ridge National Laboratory (ORNL) is a multipurpose research and development (R&D) facility owned and operated by the Department of Energy (DOE) and managed under subcontract by Martin Marietta Energy Systems (Energy Systems), Inc. ORNL R&D activities generate numerous small waste streams. In the hazardous waste category alone, over 300 streams of a diverse nature exist. Generation avoidance, reduction or recycling of wastes is an important goal in maintaining efficiency of ORNL R&D activities and protection of workers, the public, and the environment. Waste minimization is defined as any action that minimizes or eliminates the volume or toxicity of waste by avoiding its generation or recycling. This is accomplished by material substitution and inventory management, process modification, or recycling wastes for reuse. Waste reduction is defined as waste minimization plus treatment which results in volume or toxicity reduction. The ORNL Waste Reduction Program will include both waste minimization and waste reduction activities.

  1. Waste Reduction plan for Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    Oak Ridge National Laboratory (ORNL) is a multipurpose research and development (R D) facility owned and operated by the Department of Energy (DOE) and managed under subcontract by Martin Marietta Energy Systems (Energy Systems), Inc. ORNL R D activities generate numerous small waste streams. In the hazardous waste category alone, over 300 streams of a diverse nature exist. Generation avoidance, reduction or recycling of wastes is an important goal in maintaining efficiency of ORNL R D activities and protection of workers, the public, and the environment. Waste minimization is defined as any action that minimizes or eliminates the volume or toxicity of waste by avoiding its generation or recycling. This is accomplished by material substitution and inventory management, process modification, or recycling wastes for reuse. Waste reduction is defined as waste minimization plus treatment which results in volume or toxicity reduction. The ORNL Waste Reduction Program will include both waste minimization and waste reduction activities.

  2. Oak Ridge National Laboratory Transuranic Waste Certification Program

    SciTech Connect (OSTI)

    Smith, J.H.; Bates, L.D.; Box, W.D.; Aaron, W.S.; Setaro, J.A.

    1988-08-01

    The US Department of Energy (DOE) has requested that all DOE facilities handling defense transuranic (TRU) waste develop and implement a program whereby all TRU waste will be contained, stored, and shipped to the Waste Isolation Pilot Plant (WIPP) in accordance with the requirements set forth in the DOE certification documents WIPP-DOE-069, 114, 120, 137, 157, and 158. The program described in this report describes how Oak Ridge National Laboratory (ORNL) intends to comply with these requirements and the techniques and procedures used to ensure that ORNL TRU wastes are certifiable for shipment to WIPP. This document describes the program for certification of newly generated (NG) contact-handled transuranic (CH-TRU) waste. Previsions have been made for addenda, which will extend the coverage of this document to include certification of stored CH-TRU and NG and stored remote-handled transuranic (RH-TRU) waste, as necessary. 24 refs., 11 figs., 4 tabs.

  3. Site investigation report and corrective action plan for Tank 2310-U at the Pine Ridge West Repeater Station, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Eaton, J.M.; Ingram, E.M. )

    1991-04-01

    This Site Investigation Report/Corrective Action Plan (SIR/CAP) for the Pine Ridge West Repeater Station Site, includes the Underground Storage Tank (UST) 2310-U. The site and tank are located at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This report documents the results of investigations of petroleum releases at the Pine Ridge West Repeater Station Site and satisfies the requirements of Rule 1200-1-15-06 of the Rules of the Tennessee Department of Health and Environment (TDHE) which became effective on April 15, 1990. Underlying soils were evaluated to determine the nature and extent of contamination. Results of the site investigation soil analysis indicate that the horizontal extent of contaminant migration appears to be minute. The contamination appears to be limited to the areas directly adjacent to the former Tank 2310-U location. Although the horizontal extent of contamination has been adequately defined, the vertical extent of contaminant migration has not. This information was, however, adequate to conduct a review of corrective action alternatives, although it is apparent that soil permeability testing must be conducted prior to a final determination at the site. If the hydraulic conductivity of the soil is less than 10{sup {minus}4} cm/s no further action is required. Should the hydraulic conductivity be equal to or greater than 10{sup {minus}4} cm/s some corrective action would be required. 24 refs., 9 figs., 8 tabs.

  4. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant`s QA programs that are necessary for this project.

  5. Oak Ridge Reservation Annual Site Environmental Report Summary, 2002

    SciTech Connect (OSTI)

    Hughes, JF

    2003-11-25

    The ''State-of-the-Environment'' on and around the Oak Ridge Reservation is a mission of highest importance to the Department of Energy and our contractors. In order to be fully aware of the consequences of our operations and cleanup, an annual multimillion-dollar monitoring and surveillance program collects and analyzes tens of thousands of samples from air, surface and groundwater, soil, mud, plants, and animals. A mission of equal importance is to provide our stakeholders a complete understanding of this program. To do this we publish a detailed Annual Site Environmental Report and this summary document. The raw data is published separately in the Data Volume. All three documents can be found on the web, along with past documents, at http://www.ornl.gov/aser. Though I work on numerous technical documents throughout the year, no document is more important to me than the Annual Site Environmental Report and its Summary because: (1) they represent the efforts of many dedicated environmental scientists who carry out this extensive program, and who work hard to protect and enhance the environment; (2) they set out the programs in great detail to our legislatures, stakeholders, and the public; and (3) the Summary is directed to the public with the hope that the information is understandable and of value in gaining an accurate picture of the Oak Ridge Reservation as a neighbor. I thank the Karns High School students and their teacher for accepting my challenge in writing this Annual Site Environmental Report Summary, for thinking out of the box, for doing such a fine job, and for all the artwork and photographs (the morning coffee in the classroom was greatly appreciated, leaks and all). They were an especially enjoyable class to work with, and I hope you, our stakeholders and the public, find their efforts of value.

  6. Groundwater quality assessment report for Solid Waste Storage Area 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee -- 1997

    SciTech Connect (OSTI)

    1998-02-01

    Solid Waste Storage Area (SWSA) 6, located at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) facility, is a shallow land burial site for low-level radioactive waste (LLW) and other waste types. Wastes were disposed of in unlined trenches and auger holes from 1969 until May 1986, when it was determined that Resource Conservation and Recovery Act (RCRA) regulated wastes were being disposed of there. DOE closed SWSA 6 until changes in operating procedures prevented the disposal of RCRA wastes at SWSA 6. The site, which reopened for waste disposal activities in July 1986, is the only currently operating disposal area for low-level radioactive waste at ORNL. In addition to SWSA 6, it was determined that hazardous wastes were treated at the Explosives Detonation Trench (EDT). Explosives and shock-sensitive chemicals such as picric acid, phosphorus, and ammonium nitrate were detonated; debris from the explosions was backfilled into the trench.

  7. Final deactivation project report on the Integrated Process Demonstration Facility, Building 7602 Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-09-01

    The purpose of this report is to document the condition of the Integrated Process Demonstration Facility (Building 7602) at Oak Ridge National Laboratory (ORNL) after completion of deactivation activities by the High Ranking Facilities Deactivation Project (HRFDP). This report identifies the activities conducted to place the facility in a safe and environmentally sound condition prior to transfer to the U.S. Department of Energy (DOE) Environmental Restoration EM-40 Program. This report provides a history and description of the facility prior to commencing deactivation activities and documents the condition of the building after completion of all deactivation activities. Turnover items, such as the Post-Deactivation Surveillance and Maintenance (S&M) Plan, remaining hazardous and radioactive materials inventory, radiological controls, Safeguards and Security, and supporting documentation provided in the Office of Nuclear Material and Facility Stabilization Program (EM-60) Turnover package are discussed.

  8. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 2: Data

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Background Soil Characterization Project (BSCP) will provide background concentration levels of selected metals organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents. This volume contains the data from the Background Soil Characterization Project. When available, the following validation qualifiers are used in the appendixes. When validation qualifiers are not available, the corresponding contract laboratory data qualifiers appearing on the next page are used.

  9. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  10. Summary of available waste forecast data for the Environmental Restoration Program at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report identifies patterns of Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) waste generation that are predicted by the current ER Waste Generation Forecast data base. It compares the waste volumes to be generated with the waste management capabilities of current and proposed treatment, storage, or disposal (TSD) facilities. The scope of this report is limited to wastes generated during activities funded by the Office of the Deputy Assistant Secretary for Environmental Restoration (EM-40) and excludes wastes from the decontamination and decommissioning of facilities. Significant quantities of these wastes are expected to be generated during ER activities. This report has been developed as a management tool supporting communication and coordination of waste management activities at ORNL. It summarizes the available data for waste that will be generated as a result of remediation activities under the direction of the U.S. Department of Energy Oak Ridge Operations Office and identifies areas requiring continued waste management planning and coordination. Based on the available data, it is evident that most remedial action wastes leaving the area of contamination can be managed adequately with existing and planned ORR waste management facilities if attention is given to waste generation scheduling and the physical limitations of particular TSD facilities. Limited use of off-site commercial TSD facilities is anticipated, provided the affected waste streams can be shown to satisfy the requirements of the performance objective for certification of non-radioactive hazardous waste and the waste acceptance criteria of the off-site facilities. Ongoing waste characterization will be required to determine the most appropriate TSD facility for each waste stream.

  11. White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 3 Appendix C

    SciTech Connect (OSTI)

    1996-11-01

    This report provides details on the baseline ecological risk assessment conducted in support of the Remedial Investigation (RI) Report for the Melton Valley areas of the White Oak Creek watershed (WOCW). The RI presents an analysis meant to enable the US Department of Energy (DOE) to pursue a series of remedial actions resulting in site cleanup and stabilization. The ecological risk assessment builds off of the WOCW screening ecological risk assessment. All information available for contaminated sites under the jurisdiction of the US Department of Energy`s Comprehensive Environmental Response, Compensation, and Liability Act Federal Facilities Agreement within the White Oak Creek (WOC) RI area has been used to identify areas of potential concern with respect to the presence of contamination posing a potential risk to ecological receptors within the Melton Valley area of the White Oak Creek watershed. The risk assessment report evaluates the potential risks to receptors within each subbasin of the watershed as well as at a watershed-wide scale. The WOC system has been exposed to contaminant releases from Oak Ridge National Laboratory and associated operations since 1943 and continues to receive contaminants from adjacent waste area groupings.

  12. Oak Ridge Operations Formerly Utilized Sites Remedial Action...

    Office of Legacy Management (LM)

    ... I BAYO CANYON GLOSSARY ABBREVIATIONSTERMS DEFINITIONS AEC Atomic Energy Commission alpha ... FB&DU Ford, Bacon & Davis Utah Inc. gamma background Natural gamma ray activity everywhere ...

  13. Hydrologic data summary for the White Oak Creek watershed at Oak Ridge National Laboratory, Oak Ridge, Tennessee, January--December 1994

    SciTech Connect (OSTI)

    Borders, D.M.; Ziegler, K.S.; Reece, D.K.; Watts, J.A.; Frederick, B.J.; McCalla, W.L.; Pridmore, D.J.

    1995-08-01

    This report summarizes, for the 12-month period January through December 1994, the available dynamic hydrologic data collected on the White Oak Creek (WOC) watershed as well as information collected on surface flow systems in the surrounding vicinity that may affect the quality or quantity of surface water in the watershed. The collection of hydrologic data is one component of numerous, ongoing Oak Ridge National Laboratory (ORNL) environmental studies and monitoring programs and is intended to characterize the quantity and quality of water in the surface flow system, assist with the planning and assessment of remedial action activities, provide long-term availability of data and quality assurance of these data, and support long-term measures of contaminant fluxes at a spatial scale to provide a comprehensive picture of watershed performance that is commensurate with future remedial actions.

  14. Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

  15. Oak Ridge Site Specific Advisory Board Monthly Meeting W W W

    Office of Environmental Management (EM)

    O O O c c c t t t o o o b b b e e e r r r 1 1 1 4 4 4 , , , 2 2 2 0 0 0 1 1 1 5 5 5 6 p.m., DOE Information Center 1 Science.gov Way Oak Ridge, Tennessee The mission of the Oak Ridge Site Specific Advisory Board (ORSSAB) is to provide informed advice and recommendations concerning site specific issues related to the Department of Energy's (DOE's) Environmental Management (EM) Program at the Oak Ridge Reservation. In order to provide unbiased evaluation and recommendations on the cleanup efforts

  16. Oak Ridge EM Program Completes K-25 North End Demolition | Department of

    Energy Savers [EERE]

    Site | Department of Energy Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site August 1, 2012 - 12:00pm Addthis Workers near completion of the non-technetium area of K-25’s east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. Workers near completion of the non-technetium area of K-25's east wing (left). Oak Ridge anticipates beginning demolition

  17. Oak_Ridge_Associated_Universities_Radiation_Emergency_Assistance_Center-Training_Site.pdf

    Energy Savers [EERE]

    Building K-27 Disappearing Quickly Oak Ridge's Building K-27 Disappearing Quickly May 31, 2016 - 1:00pm Addthis Crews are moving at an impressive pace on Building K-27, completing more than 65 percent of the demolition since February. Crews are moving at an impressive pace on Building K-27, completing more than 65 percent of the demolition since February. Oak Ridge is moving quickly toward fulfilling its Vision 2016 by the year's end. Oak Ridge is moving quickly toward fulfilling its Vision 2016

  18. Fiscal year 1996 well plugging and abandonment program Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1997-04-01

    This report is a synopsis of the progress of the well plugging and abandonment program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, from August 1995 through August 1996. A total of 27 wells, piezometers, and borings were plugged and abandoned during the period of time covered in this report. All wells and borings were plugged and abandoned in accordance with the Monitoring Well Plugging and Abandonment Plan for the U.S. Department of Energy, Y-12 Plant, Oak Ridge, Tennessee (HSW, Inc. 1991).

  19. DOE - Office of Legacy Management -- Oak Ridge TN Warehouse Site - TN 09

    Office of Legacy Management (LM)

    Oak Ridge TN Warehouse Site - TN 09 FUSRAP Considered Sites Oak Ridge, TN, Warehouses Alternate Name(s): Elza Gate Elza Gate Warehouse Area Melton Lake Industrial Park MED Warehouses TN.09-1 TN.09-8 Location: Meco Lane (formerly Antwerp Lane), Melton Industrial Park, Oak Ridge, Tennessee TN.09-7 Historical Operations: Stored pitchblende (high-grade uranium ore) and slag and tailings, which released uranium, radium, and thorium. TN.09-3 TN.09-7 TN.09-8 Eligibility Determination: Eligible TN.09-1

  20. Oak Ridge Health Studies Phase 1 report, Volume 2: Part D, Dose Reconstruction Feasibility Study. Tasks 6, Hazard summaries for important materials at the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Bruce, G.M.; Walker, L.B.; Widner, T.E.

    1993-09-01

    The purpose of Task 6 of Oak Ridge Phase I Health Studies is to provide summaries of current knowledge of toxic and hazardous properties of materials that are important for the Oak Ridge Reservation. The information gathered in the course of Task 6 investigations will support the task of focussing any future health studies efforts on those operations and emissions which have likely been most significant in terms of off-site health risk. The information gathered in Task 6 efforts will likely also be of value to individuals evaluating the feasibility of additional health,study efforts (such as epidemiological investigations) in the Oak Ridge area and as a resource for citizens seeking information on historical emissions.

  1. Implementation plan for liquid low-level radioactive waste systems under the FFA for fiscal years 1996 and 1997 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-06-01

    This document is the fourth annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). In addition, this document lists FFA activities planned for FY 1997. Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that have been removed from service.

  2. Type B Accident Investigation of the Subcontractor Employee Injuries from a November 15, 2000, Fall Accident at the Oak Ridge National Laboratory

    Broader source: Energy.gov [DOE]

    On November 15, 2000, an accident occurred at the U. S. Department of Energy (DOE) Oak Ridge National Laboratory located in Oak Ridge, Tennessee. An employee of Decon and Recovery Services of Oak Ridge, LLC (DRS), working on an Oak Ridge Operations Office (ORO) Environmental Management decommissioning and demolition project received serious injuries from a fall (approximately 13 feet) from a fixed ladder.

  3. Site characterization summary report for dry weather surface water sampling upper East Fork Poplar Creek characterization area Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-08-01

    This report describes activities associated with conducting dry weather surface water sampling of Upper East Fork Poplar Creek (UEFPC) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This activity is a portion of the work to be performed at UEFPC Operable Unit (OU) 1 [now known as the UEFPC Characterization Area (CA)], as described in the RCRA Facility Investigation Plan for Group 4 at the Oak- Ridge Y-12 Plant, Oak Ridge, Tennessee and in the Response to Comments and Recommendations on RCRA Facility Investigation Plan for Group 4 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Volume 1, Operable Unit 1. Because these documents contained sensitive information, they were labeled as unclassified controlled nuclear information and as such are not readily available for public review. To address this issue the U.S. Department of Energy (DOE) published an unclassified, nonsensitive version of the initial plan, text and appendixes, of this Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Plan in early 1994. These documents describe a program for collecting four rounds of wet weather and dry weather surface water samples and one round of sediment samples from UEFPC. They provide the strategy for the overall sample collection program including dry weather sampling, wet weather sampling, and sediment sampling. Figure 1.1 is a schematic flowchart of the overall sampling strategy and other associated activities. A Quality Assurance Project Plan (QAPJP) was prepared to specifically address four rounds of dry weather surface water sampling and one round of sediment sampling. For a variety of reasons, sediment sampling has not been conducted and has been deferred to the UEFPC CA Remedial Investigation (RI), as has wet weather sampling.

  4. DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Harpenau, Evan M

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  5. DOE Oak Ridge Contributions Top $138,000 for 2008 Combined Federal Campaign

    National Nuclear Security Administration (NNSA)

    | National Nuclear Security Administration | (NNSA) DOE Oak Ridge Contributions Top $138,000 for 2008 Combined Federal Campaign March 10, 2009 Microsoft Office document icon R-09-18

  6. NNSA Security Professional of the Year Awards Presented to Two Oak Ridge

    National Nuclear Security Administration (NNSA)

    Officials | National Nuclear Security Administration | (NNSA) Security Professional of the Year Awards Presented to Two Oak Ridge Officials June 08, 2010 Microsoft Office document icon R-6-7.doc

  7. Clifton Truman Daniel's visit to Oak Ridge and Y-12, part 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    called me several weeks ago to state that he had initiated contact with President Harry S. Truman's grandson and that he was anxious to visit Oak Ridge. That was exciting...

  8. Oak Ridge National Laboratory site data for safety-analysis report

    SciTech Connect (OSTI)

    Fitzpatrick, F.C.

    1982-12-01

    The Oak Ridge National Laboratory site data contained herein were compiled in support of the United States Department of Energy (USDOE) Oak Ridge Operations Office Order OR 5481.1. That order sets forth assignment of responsibilities for safety analysis and review responsibilities and provides guidance relative to the content and format of safety analysis reports. The information presented in this document is intended for use by reference in individual safety analysis reports where applicable to support accident analyses or the establishment of design bases of significance to safety, and it is applicable only to Oak Ridge National Laboratory facilities in Bethel and Melton Valleys. This information includes broad descriptions of the site characteristics, radioactive waste handling and monitoring practices, and the organization and operating policies at Oak Ridge National Laboratory. The historical background of the Laboratory is discussed briefly and the overall physical situation of the facilities is described in the following paragraphs.

  9. CAD data exchange with Martin Marietta Energy Systems, Inc., Oak Ridge, TN

    SciTech Connect (OSTI)

    Smith, K.L.

    1994-10-01

    This document has been developed to provide guidance in the interchange of electronic CAD data with Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee. It is not meant to be as comprehensive as the existing standards and specifications, but to provide a minimum set of practices that will enhance the success of the CAD data exchange. It is now a Department of Energy (DOE) Oak Ridge Field Office requirement that Architect-Engineering (A-E) firms prepare all new drawings using a Computer Aided Design (CAD) system that is compatible with the Facility Manager`s (FM) CAD system. For Oak Ridge facilities, the CAD system used for facility design by the FM, Martin Marietta Energy Systems, Inc., is Intregraph. The format for interchange of CAD data for Oak Ridge facilities will be the Intergraph MicroStation/IGDS format.

  10. Recovery Act Funds are Helping Oak Ridge's Building K-33 Disappear Fast

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act workers in Oak Ridge are working safely and quickly to complete the demolition of Building K-33, a 1.4 million-square-foot former gaseous diffusion plant in...

  11. A brief overview of some historical details of Oak Ridge, part...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    look at the general history and then the specific ORNL and ORAU history. As early as the summer of 1942, the area of East Tennessee now known as Oak Ridge was targeted to be...

  12. I I~ I~~" Oak Ridge As.slJj:iatea I Universities Prepared

    Office of Legacy Management (LM)

    ... November 1982. Oak Ridge Operations, U.S. Atomic Energy Commission, Radiation Survey and ... T.E. Myrick, et al., Preliminary Results of the Ground-Level Gamma-Ray Scan Survey of the ...

  13. Small Businesses Contribute to Success of DOE/NNSA Oak Ridge Missions |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Nuclear Security Administration | (NNSA) Businesses Contribute to Success of DOE/NNSA Oak Ridge Missions December 18, 2007 Microsoft Office document icon R-07-051

  14. Small Businesses Pave the Way to $20 Million in Savings at Oak Ridge

    Broader source: Energy.gov [DOE]

    Earlier this week, the Office of Environmental Management shared the news that a new enclosure at Oak Ridge that processes radioactive casks has saved nearly $20 million by putting the facility on...

  15. Nuclear Energy Advisory Committee Facility Subcommittee visit to Oak Ridge National Laboratory

    Broader source: Energy.gov [DOE]

    The NEAC Facilities Subcommittee made a site visit to Oak Ridge National Laboratory (ORNL) on August 26, 2010. Subcommittee members included John Ahearne (Vice Chairman of NEAC and Facilities...

  16. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Broader source: Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  17. Closure certification report for the Bear Creek burial grounds B area and walk-in pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    On July 5, 1993, the revised RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, DOE/OR/01-1100&D3 and Y/ER-53&D3, was approved by the Tennessee Department of Environment and Conservation (TDEC). The closure activities described in that closure plan have been performed. The purpose of this document is to summarize the closure activities for B Area and Walk-In Pits (WIPs), including placement of the Kerr Hollow Quarry debris at the WIPs.

  18. Oak Ridge National Laboratory Institutional Plan FY 1984-FY 1989

    SciTech Connect (OSTI)

    Not Available

    1983-11-01

    In this plan, Oak Ridge National Laboratory (ORNL) continues to be committed to scientific and technological research that is based on technical excellence and innovation and that provides a foundation for and a stimulus to broader and more sustained economic growth. DOE is being asked to assist in establishing a new program for Laboratory cooperation with industry, beginning with an initial focus on materials science. The current Institutional Plan thus projects growth in the materials science area as well as in other basic physical science areas and suggests a new initiative designed to extend the various technology transfer activities and to make them more effective by using ORNL as the trial Laboratory for some of these different approaches. This Institutional Plan projects a stable future for ORNL, with only modest amounts of growth in selected areas of research for the FY 1984-FY 1989 planning cycle. Summaries of the overall picture of the proposed budget and personnel levels for the current planning cycle are included. Scientific programs, laboratory resource development, and private sector interactions are discussed.

  19. Advancing Materials Science using Neutrons at Oak Ridge National Laboratory

    ScienceCinema (OSTI)

    Carpenter, John

    2014-06-03

    Jack Carpenter, pioneer of accelerator-based pulsed spallation neutron sources, talks about neutron science at Oak Ridge National Laboratory (ORNL) and a need for a second target station at the Spallation Neutron Source (SNS). ORNL is the Department of Energy's largest multiprogram science and energy laboratory, and is home to two scientific user facilities serving the neutron science research community: the High Flux Isotope Reactor (HFIR) and SNS. HFIR and SNS provide researchers with unmatched capabilities for understanding the structure and properties of materials, macromolecular and biological systems, and the fundamental physics of the neutron. Neutrons provide a window through which to view materials at a microscopic level that allow researchers to develop better materials and better products. Neutrons enable us to understand materials we use in everyday life. Carpenter explains the need for another station to produce long wavelength neutrons, or cold neutrons, to answer questions that are addressed only with cold neutrons. The second target station is optimized for that purpose. Modern technology depends more and more upon intimate atomic knowledge of materials, and neutrons are an ideal probe.

  20. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

  1. Status report on the geology of the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Hatcher, R.D. Jr.; Lemiszki, P.J.; Foreman, J.L.; Dreier, R.B.; Ketelle, R.H.; Lee, R.R.; Lee, Suk Young; Lietzke, D.A.; McMaster, W.M.

    1992-10-01

    This report provides an introduction to the present state of knowledge of the geology of the Oak Ridge Reservation (ORR) and a cursory introduction to the hydrogeology. An important element of this work is the construction of a modern detailed geologic map of the ORR (Plate 1), which remains in progress. An understanding of the geologic framework of the ORR is essential to many current and proposed activities related to land-use planning, waste management, environmental restoration, and waste remediation. Therefore, this report is also intended to convey the present state of knowledge of the geologic and geohydrologic framework of the ORR and vicinity and to present some of the available data that provide the basic framework for additional geologic mapping, subsurface geologic, and geohydrologic studies. In addition, some recently completed, detailed work on soils and other surficial materials is included because of the close relationships to bedrock geology and the need to recognize the weathered products of bedrock units. Weathering processes also have some influence on hydrologic systems and processes at depth.

  2. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

  3. Groundwater surveillance plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Forstrom, J.M.; Smith, E.D.; Winters, S.L.; Haase, C.S.; King, H.L.; McMaster, W.M.

    1994-07-01

    US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent monitoring and groundwater surveillance have been defined in the Martin Marietta Energy Systems, Inc., Groundwater Surveillance Strategy. As defined in the strategy, a groundwater surveillance program consists of two parts, plant perimeter surveillance and off-site water well surveillance. This document identifies the sampling locations, parameters, and monitoring frequencies for both of these activities on and around the ORR and describes the rationale for the program design. The program was developed to meet the objectives of DOE Order 5400.1 and related requirements in DOE Order 5400.5 and to conform with DOE guidance on environmental surveillance and the Energy Systems Groundwater Surveillance Strategy.

  4. The deep hydrogeologic flow system underlying the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Nativ, R.; Hunley, A.E.

    1993-07-01

    The deep hydrogeologic system underlying the Oak Ridge Reservation contains some areas contaminated with radionuclides, heavy metals, nitrates, and organic compounds. The groundwater at that depth is saline and has previously been considered stagnant. On the basis of existing and newly collected data, the nature of flow of the saline groundwater and its potential discharge into shallow, freshwater systems was assessed. Data used for this purpose included (1) spatial and temporal pressures and hydraulic heads measured in the deep system, (2) hydraulic parameters of the formations in question, (3) spatial temperature variations, and (4) spatial and temporal chemical and isotopic composition of the saline groundwater. In addition, chemical analyses of brine in adjacent areas in Tennessee, Kentucky, Ohio, Pennsylvania, and West Virginia were compared with the deep water underlying the reservation to help assess the origin of the brine. Preliminary conclusions suggest that the saline water contained at depth is old but not isolated (in terms of recharge and discharge) from the overlying active and freshwater-bearing units. The confined water (along with dissolved solutes) moves along open fractures (or man-made shortcuts) at relatively high velocity into adjacent, more permeable units. Groundwater volumes involved in this flow probably are small.

  5. Oak Ridge National Laboratory Institutional Plan, FY 1991--FY 1996

    SciTech Connect (OSTI)

    Not Available

    1991-02-01

    The Oak Ridge National Laboratory -- one of DOE's major multiprogram laboratories -- focuses its resources on energy research and development (R D). To be able to meet these R D challenges, the Laboratory must achieve excellence in its operations relative to environmental, safety, and health (ES H) protection and to restore its aging facility infrastructure. ORNL's missions are carried out in compliance with all applicable ES H regulations. The Laboratory conducts applied R D in energy technologies -- in conservation; fission; magnetic fusion; health and environmental protection; waste management; renewable resources; and fossil energy. Experimental and theoretical research is undertaken to investigate fundamental problems in physical, chemical, materials, computational, biomedical, earth, and environmental sciences; to advance scientific knowledge; and to support energy technology R D. ORNL designs, builds, and operates unique research facilities for the benefit of university, industrial, and national laboratory researchers. The Laboratory serves as a catalyst in bringing national and international research elements together for important scientific and technical collaborations. ORNL helps to prepare the scientific and technical work force of the future by offering innovative and varied learning and R D experiences at the Laboratory for students and faculty from preschool level through postdoctoral candidates. The transfer of science and technology to US industries and universities is an integral component of ORNL's R D missions. ORNL also undertakes research and development for non-DOE sponsors when such work is synergistic with DOE mission. 66 figs., 55 tabs.

  6. Oak Ridge Isotope Production Cyclotron Facility and Target Handling

    SciTech Connect (OSTI)

    Bradley, Eric Craig; Varma, Venugopal Koikal; Egle, Brian; Binder, Jeffrey L; Mirzadeh, Saed; Tatum, B Alan; Burgess, Thomas W; Devore, Joe; Rennich, Mark; Saltmarsh, Michael John; Caldwell, Benjamin Cale

    2011-01-01

    Abstract The Nuclear Science Advisory Committee issued in August 2009 an Isotopes Subcommittee report that recommended the construction and operation of a variable-energy, high-current, multiparticle accelerator for producing medical radioisotopes. To meet the needs identified in the report, Oak Ridge National Laboratory is developing a technical concept for a commercial 70 MeV dual-port-extraction, multiparticle cyclotron to be located at the Holifield Radioactive Ion Beam Facility. The conceptual design of the isotope production facility as envisioned would provide two types of targets for use with this new cyclotron. One is a high-power target cooled by water circulating on both sides, and the other is a commercial target cooled only on one side. The isotope facility concept includes an isotope target vault for target irradiation and a shielded transfer station for radioactive target handling. The targets are irradiated in the isotope target vault. The irradiated targets are removed from the target vault and packaged in an adjoining shielded transfer station before being sent out for postprocessing. This paper describes the conceptual design of the target-handling capabilities required for dealing with these radioactive targets and for minimizing the contamination potential during operations.

  7. Oak Ridge National Laboratory institutional plan, FY 1990--FY 1995

    SciTech Connect (OSTI)

    Not Available

    1989-11-01

    The Oak Ridge National Laboratory is one of DOE's major multiprogram energy laboratories. ORNL's program missions are (1) to conduct applied research and engineering development in support of DOE's programs in fusion, fission, fossil, renewables (biomass), and other energy technologies, and in the more efficient conversion and use of energy (conservation) and (2) to perform basic scientific research in selected areas of the physical and life sciences. These missions are to be carried out in compliance with environmental, safety, and health regulations. Transfer of science and technology is an integral component of our missions. A complementary mission is to apply the Laboratory's resources to other nationally important tasks when such work is synergistic with the program missions. Some of the issues addressed include education, international competitiveness, hazardous waste research and development, and selected defense technologies. In addition to the R D missions, ORNL performs important service roles for DOE; these roles include designing, building, and operating user facilities for the benefit of university and industrial researchers and supplying radioactive and stable isotopes that are not available from private industry. Scientific and technical efforts in support of the Laboratory's missions cover a spectrum of activities. In fusion, the emphasis is on advanced studies of toroidal confinement, plasma heating, fueling systems, superconducting magnets, first-wall and blanket materials, and applied plasma physics. 69 figs., 49 tabs.

  8. Oak Ridge EM Program Increases Focus on Mercury Cleanup | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy EM Program Increases Focus on Mercury Cleanup Oak Ridge EM Program Increases Focus on Mercury Cleanup May 7, 2013 - 12:00pm Addthis Tennessee Department of Environment and Conservation Commissioner Robert Martineau, left to right, U.S. Sen. Lamar Alexander (R-Tenn.), Oak Ridge EM Manager Mark Whitney, EM Senior Advisor Dave Huizenga and EPA Deputy Regional Administrator for Region 4 Stan Meiburg gathered for the announcement on mercury cleanup. Tennessee Department of Environment and

  9. Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: EM Waste Management Facility ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for wastes generated by environmental restoration activities being conducted at the US Department of

  10. Summary - Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN

    Office of Environmental Management (EM)

    & ORNL, Oak Ridge, TN EM Project: Integrated Facility Disposition Project (IFDP) ETR Report Date: August 2008 ETR-15 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Major Risk Factors Integrated Facility Disposition Project (IFDP) Oak Ridge, TN Why DOE-EM Did This Review Approximately two million pounds of mercury are unaccounted for at Y-12 and mercury contamination has been detected in both soils and groundwater. The IFDP will

  11. DOE Awards $3 Million Contract to Oak Ridge Associated Universities for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expert Review of Yucca Mountain Work | Department of Energy Million Contract to Oak Ridge Associated Universities for Expert Review of Yucca Mountain Work DOE Awards $3 Million Contract to Oak Ridge Associated Universities for Expert Review of Yucca Mountain Work March 31, 2006 - 9:54am Addthis Funding is for remainder of 2006, with at least another $3 million in 2007 WASHINGTON, DC - The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) today announced the

  12. DOE Issues Sources Sought/Request for Information for Oak Ridge Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management Technical Support Services | Department of Energy Sources Sought/Request for Information for Oak Ridge Office of Environmental Management Technical Support Services DOE Issues Sources Sought/Request for Information for Oak Ridge Office of Environmental Management Technical Support Services November 24, 2015 - 10:30am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) Environmental

  13. 2015 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Environmental Management | Department of Energy Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2015 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process

  14. 2013 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Environmental Management | Department of Energy Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management 2013 Annual Workforce Analysis and Staffing Plan Report - Oak Ridge Office of Environmental Management Managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce analysis process

  15. ISC-Oak Ridge Office Categorical Exclusion (CX) Determinations | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) Categorical Exclusion (CX) Determinations Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents ISC-Chicago Office Categorical Exclusion Determinations ISC-Oak Ridge Office Categorical Exclusion Determinations ISC-Chicago Office Environmental Assessments and Environmental Impact Statements ISC-Oak Ridge Office Environmental Assessments and Environmental Impact Statements Contact Information Integrated

  16. Environmental Monitoring Report - United States Department of Energy, Oak Ridge Facilities, Calendar Year 1984

    SciTech Connect (OSTI)

    Jordan, R.G.

    1999-01-01

    Each year since 1972, a report has been prepared on the environmental monitoring activities for the DOE facilities in oak Ridge, Tennessee, for the previous calendar year. previously, the individual facilities published quarterly and annual progress reports that contained some environmental monitoring data. The environmental monitoring program for 1984 includes sampling and analysis of air, water from surface streams, groundwater, creek sediment, biota, and soil for both radioactive and nonradioactive (including hazardous) materials. Special environmental studies that have been conducted in the Oak Ridge area are included in this report, primarily as abstracts or brief summaries. The annual report for 1984 on environmental monitoring and surveillance of the Oak Ridge community by Oak Ridge Associated Universities (ORAU) is included as an appendix. A brief description of the topography and climate of the Oak Ridge area and a short description of the three DOE facilities are provided below to enhance the reader's understanding of the direction and contents of the environmental monitoring program for Oak Ridge.

  17. Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – Representatives from federal, state, and local historic preservation groups gathered earlier this month to celebrate the formal completion of an agreement that preserves the historic contributions of Oak Ridge’s K-25 site to the Manhattan Project and Cold War.

  18. Union Carbides Last 20 Years in Oak Ridge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1965 (at the start of the last 20 year period we are describing) was Dr. Clarence E. Larson. He had come to Y-12 in 1943 from California (U. of C., Davis) where he was E. O....

  19. Project health and safety plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Abston, J.P.

    1997-04-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Gunite and Associated Tanks (GAAT) in the North and South Tank Farms (NTF and STF) at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to health and safety (H and S) issues. The policy and procedures in this plan apply to all GAAT operations in the NTF and STF. The provisions of this plan are to be carried out whenever activities identifies s part of the GAAT are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices in order to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air. This plan explains additional task-specific health and safety requirements such as the Site Safety and health Addendum and Activity Hazard Analysis, which should be used in concert with this plan and existing established procedures.

  20. Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Uziel, M.S.

    1995-12-01

    The Lockheed Martin Energy Systems, Inc., (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of the policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  1. Groundwater quality assessment report for Solid Waste Storage Area 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-12-31

    Solid Waste Storage Area (SWSA) 6, located at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) facility, is a shallow land burial site for low-level radioactive waste (LLW) and other waste types. Wastes were disposed of in unlined trenches and auger holes from 1969 until May 1986, when it was determined that Resource Conservation and Recovery Act (RCRA) regulated wastes were being disposed of there. DOE closed SWSA 6 until changes in operating procedures prevented the disposal of RCRA wastes at SWSA 6. The site, which reopened for waste disposal activities in July 1986, is the only currently operated disposal area for low-level radioactive waste at ORNL. This report provides the results of the 1998 RCRA groundwater assessment monitoring. The monitoring was performed in accordance with the proposed routine monitoring plan recommended in the 1996 EMP. Section 2 provides pertinent background on SWSA 6. Section 3 presents the 1998 monitoring results and discusses the results in terms of any significant changes from previous monitoring efforts. Section 4 provides recommendations for changes in monitoring based on the 1998 results. References are provided in Section 5. Appendix A provides the 1998 RCRA Sampling Data and Appendix B provides a summary of 1998 Quality Assurance results.

  2. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 3: Project Plan

    SciTech Connect (OSTI)

    Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.

    1993-10-01

    The Background Soil Characterization Project (BSCP) will provide background concentration levels of selected metals, organic compounds, and radionuclides in soils from uncontaminated on-site areas at the Oak Ridge Reservation (ORR), and off-site in the western part of Roane County and the eastern part of Anderson County. The BSCP will establish a database, recommend how to use the data for contaminated site assessment, and provide estimates of the potential human health and environmental risks associated with the background level concentrations of potentially hazardous constituents. ORR background soil characterization data will be used for two purposes. The first application will be in differentiating between naturally occurring constituents and site-related contamination. This is a very important step in a risk assessment because if sufficient background data are not available, no constituent known to be a contaminant can be eliminated from the assessment even if the sampled concentration is measured at a minimum level. The second use of the background data will be in calculating baseline risks against which site-specific contamination risks can be compared.

  3. Resource management plan for the Oak Ridge Reservation. Volume 29, Rare plants on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Cunningham, M.; Pounds, L.; Oberholster, S.; Parr, P.; Mann, L.; Edwards, L.; Rosensteel, B.

    1993-08-01

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy`s Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated.

  4. U.S. Department of Energy Oak Ridge Operations Offlce Procurement and Cantrads Division

    National Nuclear Security Administration (NNSA)

    Oak Ridge Operations Offlce Procurement and Cantrads Division P.O. BOX 2001 Oak Ridge. TN 37831 SOLICITATION, OFFER AND AWARD Dlrect Del very Adotess' U S Deoanmenl of Energy Oar R doe Ooerat ons Ofice ~ r m u r e i e n t s n d Contracts Division ,200 Administration Road, ATTN: Ballard A. Jackson Jr Oak Ridse. TN 37830 I . THIS CONTRACT IS ARATED ORDER UNDER DPAS (15 CFR 700) I NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and

  5. Proceedings of the Oak Ridge Electron Linear Accelerator (ORELA) Workshop

    SciTech Connect (OSTI)

    Dunn, M.E.

    2006-02-27

    The Oak Ridge National Laboratory (ORNL) organized a workshop at ORNL July 14-15, 2005, to highlight the unique measurement capabilities of the Oak Ridge Electron Linear Accelerator (ORELA) facility and to emphasize the important role of ORELA for performing differential cross-section measurements in the low-energy resonance region that is important for nuclear applications such as nuclear criticality safety, nuclear reactor and fuel cycle analysis, stockpile stewardship, weapons research, medical diagnosis, and nuclear astrophysics. The ORELA workshop (hereafter referred to as the Workshop) provided the opportunity to exchange ideas and information pertaining to nuclear cross-section measurements and their importance for nuclear applications from a variety of perspectives throughout the U.S. Department of Energy (DOE). Approximately 50 people, representing DOE, universities, and seven U.S. national laboratories, attended the Workshop. The objective of the Workshop was to emphasize the technical community endorsement for ORELA in meeting nuclear data challenges in the years to come. The Workshop further emphasized the need for a better understanding of the gaps in basic differential nuclear measurements and identified the efforts needed to return ORELA to a reliable functional measurement facility. To accomplish the Workshop objective, nuclear data experts from national laboratories and universities were invited to provide talks emphasizing the unique and vital role of the ORELA facility for addressing nuclear data needs. ORELA is operated on a full cost-recovery basis with no single sponsor providing complete base funding for the facility. Consequently, different programmatic sponsors benefit by receiving accurate cross-section data measurements at a reduced cost to their respective programs; however, leveraging support for a complex facility such as ORELA has a distinct disadvantage in that the programmatic funds are only used to support program

  6. Aquatic Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect (OSTI)

    Baranski, Dr. Michael J.

    2011-04-01

    This report presents an assessment of the natural area value of eight Aquatic Natural Areas (ANAs) and seven Aquatic Reference Areas (ARAs) on the Oak Ridge Reservation (ORR) in Anderson and Roane Counties in east Tennessee. It follows a previous study in 2009 that analyzed and evaluated terrestrial natural areas on the Reservation. The purpose of both studies was to evaluate and rank those specially designated areas on the Reservation that contain sensitive species, special habitats, and natural area value. Natural areas receive special protections through established statutes, regulations, and policies. The ORR contains 33,542 acres (13,574 ha) administered by the Department of Energy. The surface waters of the Reservation range from 1st-order to 5th-order streams, but the majority of the streams recognized as ANAs and ARAs are 1st- and 2nd-order streams. East Fork Poplar Creek is a 4th-order stream and the largest watershed that drains Reservation lands. All the waters of the Reservation eventually reach the Clinch River on the southern and western boundaries of the ORR. All available information was collected, synthesized, and evaluated. Field observations were made to support and supplement the available information. Geographic information system mapping techniques were used to develop several quantitative attributes about the study areas. Narrative descriptions of each ANA and ARA and tables of numerical data were prepared. Criteria for assessment and evaluation were developed, and eight categories of factors were devised to produce a ranking system. The evaluation factors used in the ranking system were: (A) size of area, (B) percentage of watershed protected, (C) taxa present with protected status, (D) overall biotic diversity, (E) stream features, (F) water quality and use support ratings, (G) disturbance regime, and (H) other factors. Each factor was evaluated on a 5-point ranking scale (0-4), and each area received a composite score, where 32 was the

  7. Annual Report on Environmental Monitoring Activities for FY 1995 (Baseline Year) at Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-06-01

    This report describes baseline contaminant release conditions for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). The sampling approach and data analysis methods used to establish baseline conditions were presented in ``Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (EMP).`` As outlined in the EMP, the purpose of the baseline monitoring year at WAG 6 was to determine the annual contaminant releases from the site during fiscal year 1995 (FY95) against which any potential changes in releases over time could be compared. The baseline year data set provides a comprehensive understanding of release conditions from all major waste units in the WAG through each major contaminant transport pathway. Due to a mandate to reduce all monitoring work, WAG 6 monitoring was scaled back and reporting efforts on the baseline year results are being minimized. This report presents the quantified baseline year contaminant flux conditions for the site and briefly summarizes other findings. All baseline data cited in this report will reside in the Oak Ridge Environmental Information system (OREIS) database, and will be available for use in future years as the need arises to identify potential release changes.

  8. Type B Accident Investigation Board Report on the February 27, 1998, Shipping Violations Involving the Corehole 8 Project at the Oak Ridge National Laboratory, Oak Ridge, Tennesee

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type B Investigation Board appointed by James C. Hall, Manager, Oak Ridge Operations Office, U.S. Department of Energy. The Board was appointed to perform a Type B investigation of these incidents and to prepare an investigation report in accordance with DOE Order 225.1A, Accident Investigations.

  9. Oak Ridge Reservation Annual Site Environmental Report for 2006

    SciTech Connect (OSTI)

    McMahon, Wayne; Hughes, Joan; Coffey, Mike; Thompson, Sharon

    2007-09-01

    This document is prepared annually to summarize environmental activities, primarily environmental-monitoring activities, on the Oak Ridge Reservation (ORR) and within the ORR surroundings. The document fulfills the requirement of Department of Energy (DOE) Order 23l.IA, 'Environment, Safety and Health Reporting,' for an annual summary of environmental data to characterize environmental performance. The environmental-monitoring criteria are described in DOE Order 450.1, 'Environmental Protection Program.' The results summarized in this report are based on data collected prior to and through 2006. This report is not intended to provide the results of all sampling on the ORR. Additional data collected for other site and regulatory purposes, such as environmental restoration remedial investigation reports, waste management characterization sampling data, and environmental permit compliance data, are presented in other documents that have been prepared in accordance with applicable DOE guidance and/or laws and are referenced herein as appropriate. Corrections to the report for the previous year are found in Appendix A. Environmental monitoring on the ORR consists primarily of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents at the point of release to the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation and chemical exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; these activities provide direct measurement of contaminant concentrations in air, water, groundwater, soil, foods, biota, and other media. Environmental surveillance data provide information regarding conformity with

  10. Oak Ridge National Laboratory's philosophy and approach to NEPA

    SciTech Connect (OSTI)

    Van Hook, R.I.; Braunstein, H.M.; Sigal, L.L.; Trettin, C.C.

    1991-01-01

    At Oak Ridge National Laboratory (ORNL), the overall responsibility for compliance with the National Environmental Policy Act (NEPA) resides with Environmental Review and Documentations Section that is within the Office of Environmental Compliance and Documentation (OECD). Organizationally, OECD is a line-management division reporting to the Director for Environmental, Safety and Health Compliance. The cornerstone for NEPA compliance at ORNL is the Internal Environmental Assessment (IEA), which is designed to provide a basis for NEPA review and documentation. The Standard Operating Procedures provide for evaluation and documentation records management and training, and auditing. The IEA provides a project description and a review of environmental, health and safety issues. The completed IEA is used to make recommendations to DOE regarding the appropriate level of NEPA documentation required for the action. NEPA documents which may be prepared include the Categorical Exclusion, Abbreviated Environmental Assessment, and Environmental Assessment; actions requiring Environmental Impact Statements are prepared by US Department of Energy (US DOE). The relatively recent DOE initiative for agency-wide compliance with NEPA has created areas in which ORNL has found itself lacking adequate resources and expertise. These are discussed in this paper. Throughout ORNL, there is strong management support for compliance with NEPA which has resulted in enhanced awareness and implementation of the NEPA requirements. Guidance is being provided and Laboratory divisions are factoring early integration of NEPA into their project planning with the goal of ensuring that their activities are carried out in full compliance with the letter and the spirit of NEPA and the other environmental statutes and regulations.

  11. Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346

    SciTech Connect (OSTI)

    Hough, Gil; Fairless, Chad

    2012-07-01

    Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for the development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)

  12. Oak Ridge completes field work on Recovery Act-projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Ridge completes field work on Recovery Act-projects Oak Ridge completes field work on Recovery Act-projects May 8, 2014 - 12:00pm Addthis The U.S. Department of Energy's Oak Ridge Office of Environmental Management (EM) has finished field work on the last Recovery Act-funded environmental cleanup project. Since 2009, EM has used the $751 million in Recovery Act funds to accomplish 27 projects, many of which included multiple subcomponents and extensive scopes. "This is a landmark

  13. Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation,OAS-RA-L-12-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection Report Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation INS-RA-L-12-01 December 2011 Department of Energy Washington, DC 20585 December 16, 2011 MEMORANDUM FOR THE MANAGER, OAK RIDGE OFFICE FROM: Sandra D. Bruce Assistant Inspector General for Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation" BACKGROUND The Department of Energy's (Department) expends

  14. Extended Cold Testing of a Russian Pulsating Mixer Pump at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Lewis, BE

    2002-12-23

    The effectiveness of a mixer is dependent on the size of the tank to be mixed, the characteristics of the waste, and the operating conditions. Waste tanks throughout the U.S. Department of Energy Complex require mixing and mobilization systems capable of (1) breaking up and suspending materials that are difficult to mix and pump, without introducing additional liquids into the tank; (2) complementing and augmenting the performance of other remotely operated and/or robotic waste retrieval systems; and (3) operating in tanks with various quantities of waste. The Oak Ridge Russian pulsating mixer pump (PMP) system was designed with the flexibility to permit deployment in a variety of cylindrical tanks. The PMP was installed at the Tanks Technology Cold Test Facility at the Oak Ridge National Laboratory (ORNL) to assess the performance of the system over an extended range of operating conditions, including supply pressures up to 175 psig. Previously conducted cold tests proved the applicability of the PMP for deployment in ORNL gunite tank TH-4. The previous testing and hot demonstrations had been limited to operating at air supply pressures of <100 psig. The extended cold testing of the Russian PMP system showed that the system was capable of mobilizing waste simulants in tanks in excess of 20-ft diam. The waste simulant used in these tests was medium-grain quartz sand. The system was successfully installed, checked out, and operated for 406 pulse discharge cycles. Only minor problems (i.e., a sticking air distributor valve and a few system lockups) were noted. Some improvements to the design of the air distributor valve may be needed to improve reliability. The air supply requirements of the PMP during the discharge cycle necessitated the operation of the system in single pulse discharge cycles to allow time for the air supply reservoir to recharge to the required pressure. During the test program, the system was operated with sand depths of 2, 4, and 4.5 in.; at

  15. Removal site evaluation report on the bulk shielding facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-09-01

    This removal site evaluation report on the Bulk Shielding Facility (BSF) at Oak Ridge National Laboratory was prepared to provide the Environmental Restoration Program with information necessary to evaluate whether hazardous and/or radiological contaminants in and around BSF buildings pose a substantial risk to human health or the environment (i.e., a high probability of adverse effects) and whether remedial site evaluations or removal actions are, therefore, required. A removal site evaluation was conducted at nine areas associated with the BSF. The scope of each evaluation included (1) a search for, and review of, readily available historical records regarding operations and use of the facility (including hazardous substance usage and existing contamination); (2) interviews with facility personnel concerning current and past practices; and (3) a brief walk-through to visually inspect the facility and identify existing hazard areas requiring maintenance actions or remedial evaluation. The results of the removal site evaluation indicate that no substantial risks exist from contaminants present because adequate efforts are being made to contain and control existing contamination and hazardous substances and to protect human health and the environment. At Building 3004, deteriorated and peeling exterior paint has a direct pathway to the storm water drainage system and can potentially impact local surface water during periods of storm water runoff. The paint is assumed to be lead based, thus posing a potential problem. The paint should be sampled and analyzed to determine its lead content and to assess whether a hazard exists. If so, a maintenance action will be necessary to prevent further deterioration and dislodging of the paint. In addition, if the paint contains lead, then a remedial site evaluation should be conducted to determine whether lead from fallen chips has impacted soils in the immediate area of the building.

  16. Alternatives evaluation and decommissioning study on shielded transfer tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    DeVore, J.R.; Hinton, R.R.

    1994-08-01

    The shielded transfer tanks (STTs) are five obsolete cylindrical shipping casks which were used to transport high specific activity radioactive solutions by rail during the 1960s and early 1970s. The STTs are currently stored at the Oak Ridge National Laboratory under a shed roof. This report is an evaluation to determine the preferred alternative for the final disposition of the five STTs. The decommissioning alternatives assessed include: (1) the no action alternative to leave the STTs in their present location with continued surveillance and maintenance; (2) solidification of contents within the tanks and holding the STTs in long term retrievable storage; (3) sale of one or more of the used STTs to private industry for use at their treatment facility with the remaining STTs processed as in Alternative 4; and (4) removal of tank contents for de-watering/retrievable storage, limited decontamination to meet acceptance criteria, smelting the STTs to recycle the metal through the DOE contaminated scrap metal program, and returning the shielding lead to the ORNL lead recovery program because the smelting contractor cannot reprocess the lead. To completely evaluate the alternatives for the disposition of the STTs, the contents of the tanks must be characterized. Shielding and handling requirements, risk considerations, and waste acceptance criteria all require that the radioactive inventory and free liquids residual in the STTs be known. Because characterization of the STT contents in the field was not input into a computer model to predict the probable inventory and amount of free liquid. The four alternatives considered were subjected to a numerical scoring procedure. Alternative 4, smelting the STTs to recycle the metal after removal/de-watering of the tank contents, had the highest score and is, therefore, recommended as the preferred alternative. However, if a buyer for one or more STT could be found, it is recommended that Alternative 3 be reconsidered.

  17. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment.

  18. Type B Accident Investigation Board Report on the September 7, 2001, Burn Accident at Oak Ridge National Laboratory, Building 9210

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type B Investigation Board appointed by G. Leah Dever, Manager, Oak Ridge Operations Office, U.S. Department of Energy.

  19. Oak Ridge National Laboratory Biological Monitoring and Abatement Program for White Oak Creek Watershed and the Clinch River

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Blaylock, B.G.; Boston, H.L.; Huston, M.A.; Kimmel, B.L.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.; Walton, B.T.; Kitchings, J.T.; Olsen, C.R.

    1991-09-01

    On April 1, 1986, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge National Laboratory (ORNL) (EPA 1986). As specified in Part 3: Special Conditions (Item H) of the permit, a plan for biological monitoring of the Clinch River, White Oak Creek (WOC), Northwest Tributary (NWT) of WOC, Melton Branch (MB), Fifth Creek, and First Creek shall be submitted for approval to the US Environmental Protection Agency (EPA) and the Tennessee Department of Health and Environment (TDHE) within 90 days of the effective date of the permit. The plan, which is referred to in Part 3 (H) of the permit as the Biological Monitoring Plan and Abatement Program (BMPAP), describes characterization monitoring studies to be conducted for the duration of the permit (5 years). In order to be consistent with the terminology used for the Biological Monitoring and Abatement Programs for the Oak Ridge Y-12 Plan and the Oak Ridge K-25 Plant, BMPAP will subsequently be referred to as the Biological Monitoring and Abatement Program (BMAP). The proposed BMAP outlined in this document is based on preliminary discussions held on December 9, 1985, between staff of Martin Marietta Energy Systems, Inc. (ORNL and Central Management), the US Department of Energy (DOE), EPA, and TDHE. 232 refs., 11 figs., 7 tabs.

  20. The remedial investigation/feasibility study process at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    Martin Marietta Energy Systems, Inc. (Energy Systems), manages and operates the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, under a cost-plus-award-fee contract administered by the Department of Energy`s (DOE) Oak Ridge Operations Office (Operations Office). Energy Systems` environmental restoration program is responsible for eliminating or reducing the risk posed by inactive and surplus sites and facilities that have been contaminated with radioactive, hazardous, or mixed wastes. The remedial investigation and feasibility study (RI/FS) is being conducted as part of Energy Systems` environmental restoration program. The objective of the audit was to determine if the proposed interim source control action identified in the ``Proposed Plan for the Oak Ridge National Laboratory Waste Area Grouping 6 Interim Remedial Action`` had been adequately justified. The audit disclosed that the proposed source control interim remedial action, three flexible membrane caps estimated to cost $140 million for waste area grouping 6, was not adequately justified. We recommended that DOE justify the proposed action before agreeing to proceed. The Manager, Oak Ridge Operations Office, generally concurred with the audit recommendations.