National Library of Energy BETA

Sample records for davis dam 230-kilovolt

  1. CX-007137: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Lower 230-kilovolt Substation Service Building DemolitionCX(s) Applied: B1.23Date: 03/03/2011Location(s): Mohave County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  2. Thomas Davis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thomas Davis Thomas Davis tdavis.jpg Thomas (Tom) A. Davis Environmental Systems, CSE TADavis@lbl.gov Phone: (510) 486-4524 Fax: (510) 486-4316 1 Cyclotron Road Mail Stop 943-256 Berkeley, CA 94720 Last edited: 2016-04-29 11:34:58

  3. CX-003193: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam 230-Kilovolt Switchyards Stage 06 Upgrade (Double Breaker Double Bus) in Mohave County, ArizonaCX(s) Applied: B4.11Date: 06/30/2010Location(s): Mohave County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  4. CX-003194: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a Mid-Span Interset Structure between Structures 141/1 and 141/2 on the Existing Davis Dam-Prescott 230-Kilovolt Transmission Line in Yavapai County, ArizonaCX(s) Applied: B4.13Date: 06/10/2010Location(s): Yavapai County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest Region

  5. Davis-Bacon Act Compliance Video

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis-Bacon Act Compliance Video

  6. Gary Davis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis About Us Gary Davis - President & CEO - National Center for American Indian Enterprise Development (NCAIED) Gary Davis Gary "Litefoot" Davis is an enrolled member of the Cherokee Nation of Oklahoma. Before being appointed as President and CEO of the NCAIED, Mr. Davis served on the Board of Directors. He served as VP of Native Affairs for the Triple Five Group and he previously served as co-chair of the National Indian Gaming Association's, American Indian Business Network.

  7. Theresa Davis | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In her office, Davis reviews Argonne's Annual Site Environmental Report, which she co-authors. In her office, Davis reviews Argonne's Annual Site Environmental Report, which she co-authors. Davis, center, conducts an environmental compliance walkthrough in one of the Argonne laboratories with Kevin Crosson, left, of the Facilities Management and Services Division and Kaushik Joshi of the U.S. Department of Energy's Argonne Site Office. Davis, center, conducts an environmental compliance

  8. davis-99.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Anomalous/Lévy Photon Diffusion Theory: Toward a New Parameterization of Shortwave Transport in Cloudy Columns A. B. Davis Los Alamos National Laboratory Space and Remote Sensing Sciences Group Los Alamos, New Mexico A. Marshak National Aeronautics and Space Administration Goddard Space Flight Center Climate and Radiation Branch Greenbelt, Maryland K. P. Pfeilsticker University of Heidelberg Institute for Environmental Physics Heidelberg, Germany Introduction Optically speaking, the earth's

  9. DAVI America | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: DAVI America Address: 90 Fern Hill Dr. Place: Granville, Ohio Zip: 43023 Sector: Wind energy Product: Metal Fabrication Machinery Phone...

  10. Mark F. Davis | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mark D. Mitchell About Us Mark D. Mitchell - Communications Support Contractor to ARPA-E Mark Mitchell is a Communications Support Contractor to ARPA-E. Most Recent ARPA-E Celebrates Five Years of Changing What's Possible April 28 Energy Innovators to Convene for 2014 ARPA-E Summit February 20 Interview with ARPA-E: The Future of Semiconductors February 4

    F. Davis Mark F. Davis Director, Biosciences Center Mark.Davis@nrel.gov | 303-384-6140 Research Interests Dr. Mark Davis is the Director

  11. Davis Graham Stubbs LLP | Open Energy Information

    Open Energy Info (EERE)

    Graham Stubbs LLP Jump to: navigation, search Name: Davis Graham & Stubbs LLP Place: Denver, Colorado Zip: 80202 Sector: Services Product: String representation "Davis Graham & ......

  12. CX-011648: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  13. Davis Bacon Frequently Asked Questions (FAQs) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis Bacon Frequently Asked Questions (FAQs) Davis Bacon Frequently Asked Questions (FAQs) PDF icon DBA FAQs More Documents & Publications Davis-Bacon Act - Under the American...

  14. QER- Comment of Brenda Davies

    Broader source: Energy.gov [DOE]

    To Whom it May Concern, we are seeking fix-it-first, reduce demand, and clean energy future is the kind of energy infrastructure Massachusetts wants and needs. Not fracking, we won't allow it! -- Brenda K Davies, OTR/L Outdoor Access Providing recreation for all! YES WE CAN!!

  15. Davis Bacon Frequently Asked Questions (FAQs)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... A: Payment of wages every two weeks is a violation of the Davis-Bacon Act. Employees cannot waive the weekly pay requirement. The Davis-Bacon Act requires payment to employees "no ...

  16. Ohio Nuclear Profile - Davis Besse

    U.S. Energy Information Administration (EIA) Indexed Site

    Davis Besse" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date" 1,894,"7,610",97.2,"PWR","application/vnd.ms-excel","application/vnd.ms-excel" ,894,"7,610",97.2

  17. University of California Davis | Open Energy Information

    Open Energy Info (EERE)

    65714,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map References: University of California, Davis1 This article is a stub. You can help...

  18. Davis, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Products Advanced Energy Products Corp AEP Blue Oak Energy Davis Energy Group Geothermal Resources Council Octus Energy Inc Sierra Energy Corporation University of California...

  19. TAP Webinar: Davis-Bacon Act Compliance

    Broader source: Energy.gov [DOE]

    This webinar, held on Nov. 18, 2014, offered information for Energy Department grantees, sub-grantees, and their contractors on complying with Davis-Bacon Act requirements.

  20. lynn_davis.jpg | OSTI, US Dept of Energy Office of Scientific and Technical

    Office of Scientific and Technical Information (OSTI)

    Information lynn_davis

  1. Davis-Bacon Compliance and Performance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Davis-Bacon Compliance and Performance Davis-Bacon Compliance and Performance PDF icon Davis-Bacon Compliance and Performance More Documents & Publications DOE Order 350.3 CHAPTER...

  2. Brigadier General S.L. Davis | National Nuclear Security Administratio...

    National Nuclear Security Administration (NNSA)

    Administrator for Military Applications Brigadier General S.L. Davis Brigadier General S.L. Davis is the Principal Assistant Deputy Administrator for Military Applications at the ...

  3. UC Davis Energy Efficiency Center EEC | Open Energy Information

    Open Energy Info (EERE)

    UC Davis Energy Efficiency Center EEC Jump to: navigation, search Name: UC Davis Energy Efficiency Center (EEC) Place: California Sector: Efficiency Product: With a leadership...

  4. Davie, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    by expanding it. Davie is a town in Broward County, Florida. It falls under Florida's 20th congressional district and Florida's 22nd congressional district and Florida's 23rd...

  5. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high- level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of the five sites suitable for characterization.

  6. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considering for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has found that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization.

  7. Environmental assessment: Davis Canyon site, Utah

    SciTech Connect (OSTI)

    none,

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified the Davis Canyon site in Utah as one of the nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Davis Canyon site and the eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. These evaluations were reported in draft environmental assessments (EAs), which were issued for public review and comment. After considering the comments received on the draft EAs, the DOE prepared the final EA. The Davis Canyon site is in the Paradox Basin, which is one of five distinct geohydrologic settings considered for the first repository. This setting contains one other potentially acceptable site -- the Lavender Canyon site. Although the Lavender Canyon site is suitable for site characterization, the DOE has concluded that the Davis Canyon site is the preferred site in the Paradox Basin. On the basis of the evaluations reported in this EA, the DOE has found that the Davis Canyon site is not disqualified under the guidelines. Furthermore, the DOE has fond that the site is suitable for site characterization because the evidence does not support a conclusion that the site will not be able to meet each of the qualifying conditions specified in the guidelines. On the basis of these findings, the DOE is nominating the Davis Canyon site as one of five sites suitable for characterization. 181 figs., 175 tabs.

  8. Dam Safety 2015

    Broader source: Energy.gov [DOE]

    Make your plans now to attend Dam Safety 2015, in New Orleans! Dam Safety 2015 is one of the leading conferences in the United States dedicated to dam and levee safety engineering and technology...

  9. TAP Webinar: Davis-Bacon Act Compliance

    Broader source: Energy.gov [DOE]

    This TAP webinar held on Nov. 18, 2014 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time. It will offer information for Energy Department grantees, sub-grantees, and their contractors on complying with Davis-Bacon Act requirements.

  10. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  11. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. If ...

  12. Raymond Davis Jr., Solar Neutrinos, and the Solar Neutrino Problems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Raymond Davis, Jr., Solar Neutrinos, and the Solar Neutrino Problem Resources with Additional Information Raymond Davis, Jr. Photo Courtesy of Brookhaven National Laboratory (BNL) Raymond Davis, Jr., who conducted research in the Chemistry Department at Brookhaven National Laboratory (BNL) from 1948 through 1984, was awarded the 2002 Nobel Prize in Physics "for pioneering contributions to astrophysics, in particular for the detection of cosmic neutrinos." Dr. Davis is also a recipient

  13. Davis-Bacon Compliance and Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROCUREMENT ATTORNEYS CONFERENCE - Contractor Workforce Issues Jean Seibert Stucky Assistant General Counsel February 22, 2011 GC-63 1. Labor issues (unions) 2. Employment issues (equal employment; workforce restructuring) 3. Pensions and other benefits 4. Labor standards (e.g., Davis-Bacon Act) 2 Why is this important? 60-95% of DOE Contract costs are contractor human resource costs - 3 Roles and Responsibilities  DOE is not  The Employer of the contractor work force, or  The sponsor

  14. The Facts On Electric Vehicles: Interview with Pat Davis | Department...

    Office of Environmental Management (EM)

    ... Q: What's the general price range for home charging stations? Does it vary by market and availability? Pat Davis: It varies a lot, unfortunately. The charging equipment itself, ...

  15. Davie County, North Carolina: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Zone Number 4 Climate Zone Subtype A. Places in Davie County, North Carolina Bermuda Run, North Carolina Cooleemee, North Carolina Mocksville, North Carolina Retrieved from...

  16. Raymond Davis Jr., Solar Neutrinos, and the Solar Neutrino Problems

    Office of Scientific and Technical Information (OSTI)

    discrepancy. While at Brookhaven, Ray Davis conducted research and experiments in solar neutrinos at Homestake Gold Mine in South Dakota. This research was funded by the...

  17. Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form...

  18. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Semi-Annual Davis-Bacon Enforcement Report. Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. Enforcement Report (151.16 KB) More Documents & Publications SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Draft Sample Collection Instrument Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance

  19. Net-Zero Campus at University of California, Davis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Net-Zero Campus at University of California, Davis Net-Zero Campus at University of California, Davis Sunlight reflects off the metal window sun shields on the Ramble apartments at West Village at UC Davis in Davis, California. Sunlight reflects off the metal window sun shields on the Ramble apartments at West Village at UC Davis in Davis, California. Photo by Greg Urquiaga /UC Davis, NREL 20240 The new Viridian apartments at West Village at UC Davis. The new Viridian apartments at West Village

  20. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. If you do not have access to the PAGE system, please submit this form to DBAEnforcementReports@hq.doe.gov. The following questions regarding enforcement activity (Davis-Bacon and Related Acts) by this Agency are required by 29 CFR, Part 5.7(b), and Department of Labor, All Agency Memorandum #189. Please refer to the

  1. VBU-0083- In the Matter of S. R. Davis

    Broader source: Energy.gov [DOE]

    S. R. Davis, a former employee of Fluor Fernald, Inc. (Fluor), a Department of Energy (DOE) contractor, appeals the DOE Ohio Field Office’s (OFO) dismissal of the whistleblower complaint against...

  2. VBH-0083- In the Matter of S.R. Davis

    Broader source: Energy.gov [DOE]

    S.R. Davis (the Employee) filed a complaint against her former employer, Fluor Fernald, Inc. (the Contractor) under the Department of Energy (DOE) Contractor Employee Protection Program, 10 C.F.R....

  3. VBA-0083- In the Matter of S.R. Davis

    Broader source: Energy.gov [DOE]

    This Decision considers an Appeal of an Initial Agency Decision (IAD) issued on April 21, 2004, involving a complaint filed by S.R. Davis (also referred to as the Complainant) under the Department...

  4. Davis-Bacon Act - Under the American Recovery and Reinvestment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    American Recovery and Reinvestment Act of 2009 (ARRA) Davis-Bacon Act presentation by Jay Nathwani at the 2012 Peer Review Meeting PDF icon gtp2012peerreviewdbanathwani.pdf...

  5. Raymond Davis Jr., Solar Neutrinos, and the Solar Neutrino Problems

    Office of Scientific and Technical Information (OSTI)

    Davis is also a recipient of the 2003 Fermi Award. He was the first scientist to detect solar neutrinos, ghostlike particles produced in the nuclear reactions that power the sun. ...

  6. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT

    Broader source: Energy.gov [DOE]

    Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. If you do not have access to the PAGE system, please submit...

  7. Davis-Bacon Act - Under the American Recovery and Reinvestment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Best Practices * Post the Davis-Bacon wage determination poster at work- site * Know the prevailing wage rates and benefits are in your area geography. Check with the Wage and ...

  8. General Davis kicks the tires on a Safeguards Transporter | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) General Davis kicks the tires on a Safeguards Transporter Tuesday, October 6, 2015 - 8:43am NNSA Blog Brigadier General Stephen L. Davis, NNSA's Acting Deputy Administrator for Defense Programs, gets a lesson on how to drive a Safeguards Transporter during a recent visit to the Office of Secure Transportation (OST) headquarters in Albuquerque, New Mexico. OST is responsible for transporting nuclear weapons, components and special nuclear materials to

  9. CMI Education Partner: University of California, Davis | Critical Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Institute University of California, Davis The University of California, Davis offers courses in several areas: Chemical and Materials Science Engineering Chemistry Geology http://catalog.ucdavis.edu/programs.html course list Chemical and Materials Science Engineering , Chemistry, Chemical Physics(website cannot be opened) Courses in Engineering: Chemical and Materials Science (ECM) Lower Division 51. Material Balances (4) Lecture-4 hours. Prerequisite: Mathematics 21D with C- or better, and

  10. Signature of Bret E Knapp Signature of Kimberly Davis-Lebak

    National Nuclear Security Administration (NNSA)

    Bret E Knapp Signature of Kimberly Davis-Lebak Signature of Homer Williamson

  11. Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance, a letter to grantees from the U.S. Department of Energy's Better Buildings Neighborhood Program. Form Guidance (68 KB) More Documents & Publications SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Draft Sample Collection Instrument

  12. Revised Interpretation of the Applicability of the Davis-Bacon Act |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Revised Interpretation of the Applicability of the Davis-Bacon Act Revised Interpretation of the Applicability of the Davis-Bacon Act Revised analysis of the applicability of the Davis-Bacon Act requirements to activities funding in whole or in part by the Smart Grid Investment Grant project under the American Recovery and Reinvestment Act. Revised Interpretation of the Applicability of the Davis-Bacon Act (66.92 KB) More Documents & Publications Davis Bacon Act

  13. Denison Dam Historical Generation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 500,000 (MWh) Denison Dam Historical Generation

  14. CX-010882: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  15. NREL Names Mark Davis to Lead Biosciences Center | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Names Mark Davis to Lead Biosciences Center June 24, 2016 Dr. Mark Davis is the new director of the Biosciences Center at the Energy Department's National Renewable Energy Laboratory (NREL). "Mark has been serving in this capacity for almost a year, and we are very excited to now have him in this position formally," said Adam Bratis, NREL's associate lab director for BioEnergy Science and Technology. The Biosciences Center is under the umbrella of the BioEnergy Science and

  16. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY ...

  17. Microsoft PowerPoint - 16.1225_Terry Cooke-Davies - Project Complexity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    225Terry Cooke-Davies - Project Complexity as of 16 Mar Microsoft PowerPoint - 16.1225Terry Cooke-Davies - Project Complexity as of 16 Mar PDF icon Microsoft PowerPoint -...

  18. Davis v. Fuller, 12 Vt. 178, 198 (1840) | Open Energy Information

    Open Energy Info (EERE)

    v. Fuller, 12 Vt. 178, 198 (1840) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal CaseHearing: Davis v. Fuller, 12 Vt. 178, 198 (1840)Legal Hearing Davis...

  19. A Desk Guide To The Davis-Bacon Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Desk Guide To The Davis-Bacon Act A Desk Guide To The Davis-Bacon Act DOE DBA Desk Guide Rev 1 July 30 2012 (388.94 KB) More Documents & Publications Davis Bacon Frequently Asked Questions (FAQs) Labor Standards Training - Albuquerque Service Center 3-9-16 Labor Standards/Wage and Hour Laws

  20. Davis-Bacon Act - Under the American Recovery and Reinvestment Act of 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ARRA) | Department of Energy Davis-Bacon Act - Under the American Recovery and Reinvestment Act of 2009 (ARRA) Davis-Bacon Act - Under the American Recovery and Reinvestment Act of 2009 (ARRA) Davis-Bacon Act presentation by Jay Nathwani at the 2012 Peer Review Meeting gtp_2012peerreview_dba_nathwani.pdf (190.96 KB) More Documents & Publications DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK DAVIS-BACON ACT WAGE

  1. A DESK GUIDE TO THE DAVIS-BACON ACT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE DBA Desk Guide - Rev. 1 July 30, 2012 A DESK GUIDE TO THE DAVIS-BACON ACT Prevailing Wage Requirements for Contractors on Federal Contracts and DBA-Covered Federally Financed or Assisted Construction Projects Introduction. The U. S. Department of Energy (DOE) has prepared this Desk Guide for the use of contractors and subcontractors performing work on construction projects under a federal contract, or under a statute authorizing federal financial assistance, that requires the application of

  2. CLASSIFICdTION CAWXL~ DAm

    Office of Legacy Management (LM)

    CLASSIFICdTION CAWXL~ DAm NAR 6 1969 For the Atomic EhergY hDh=+= ,' ROBERT L JACKSON /(\' t' for the Chief, Declassification B~Jx~

  3. Milner Dam Wind Park | Open Energy Information

    Open Energy Info (EERE)

    Milner Dam Wind Park Jump to: navigation, search Name Milner Dam Wind Park Facility Milner Dam Wind Park Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  4. War damages and reconstruction of Peruca dam

    SciTech Connect (OSTI)

    Nonveiller, E.; Rupcic, J.; Sever, Z.

    1999-04-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described.

  5. Grand River Dam Authority | Open Energy Information

    Open Energy Info (EERE)

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  6. Geotechnical practice in dam rehabilitation

    SciTech Connect (OSTI)

    Anderson, L.R.

    1993-01-01

    This proceedings, Geotechnical Practice in Dam Rehabilitation, consists of papers presented at the Specialty Conference sponsored by the Geotechnical Engineering Division of the American Society of Civil Engineers held in Raleigh, North Carolina, April 25-28, 1993. The conference provided a forum for the discussion of the rehabilitation of dams, including case histories and current geotechnical practice. The topics covered by this proceeding include: (1) inspection and monitoring of dams; (2) investigation and evaluation of dams and foundations; (3) risk and reliability assessment; (4) increasing reservoir capacity, spillway modifications and overtopping; (5) seepage control; (6) improving stability of dams, foundations and reservoir slopes; (7) rehabilitation for seismic stability; and (8) geosynthetics and ground improvement techniques.

  7. NREL Names Mark Davis to Lead Biosciences Center - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Names Mark Davis to Lead Biosciences Center June 24, 2016 Photo of Mark Davis Mark Davis Dr. Mark Davis is the new director of the Biosciences Center at the Energy Department's National Renewable Energy Laboratory (NREL). "Mark has been serving in this capacity for almost a year, and we are very excited to now have him in this position formally," said Adam Bratis, NREL's associate lab director for BioEnergy Science and Technology. The Biosciences Center is under the umbrella of the

  8. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY...

    Energy Savers [EERE]

    BLOCK GRANT (EECBG) PROGRAM PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) ...

  9. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. PDF icon Enforcement Report More Documents & ...

  10. Tests with Sandia's Davis gun aid B61-12 life extension effort...

    National Nuclear Security Administration (NNSA)

    Tests with Sandia's Davis gun aid B61-12 life extension effort | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

  11. Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program...

    Broader source: Energy.gov (indexed) [DOE]

    DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS PROGRAM ...

  12. Noah Van Dam | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Noah Van Dam Postdoctoral Appointee E-mail nvandam@anl.gov Website Google Scholar

  13. Division of Safety of Dams:About Dam Safety | Open Energy Information

    Open Energy Info (EERE)

    briefly describes activities conducted by the agency to oversee the construction and maintenance of dams for the public safety. Author California Division of Safety of Dams...

  14. Text-Alternative Version of TAP Webinar: Davis-Bacon Act Compliance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Text-Alternative Version of TAP Webinar: Davis-Bacon Act Compliance Text-Alternative Version of TAP Webinar: Davis-Bacon Act Compliance Deborah Lastowka: For joining us for today's TAP webinar. Today we will be hearing from Eva Auman with the Office of the Assistant General Counsel for Labor and Pension Law on the topic of Davis Bacon Act compliance. Eva will go through her entire presentation, but as she's speaking, if you have any questions, you should feel free to

  15. Prospects for Nuclear Power(Davis 2012) | OpenEI Community

    Open Energy Info (EERE)

    Prospects for Nuclear Power(Davis 2012) Home > Groups > Energy Systems Integration Qinsun's picture Submitted by Qinsun(35) Member 15 November, 2012 - 13:36 This paper analyzed the...

  16. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM...

    Broader source: Energy.gov (indexed) [DOE]

    STATE ENERGY PROGRAM PROGRAM NOTICE 10-010 EFFECTIVE DATE: May 6, 2010 SUBJECT: DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM PROJECTS INVOLVING RESIDENTIAL ...

  17. WPN 09-9: Guidance on Implementation of the Davis-Bacon Act Prevailing Wage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements in the American Recovery and Reinvestment Act of 2009 | Department of Energy 9: Guidance on Implementation of the Davis-Bacon Act Prevailing Wage Requirements in the American Recovery and Reinvestment Act of 2009 WPN 09-9: Guidance on Implementation of the Davis-Bacon Act Prevailing Wage Requirements in the American Recovery and Reinvestment Act of 2009 Archived 09/30/15, ARRA Completion To issue guidance to Weatherization Assistance Program participants, on implementing

  18. NNSA Appoints Kim Davis Lebak to Head Los Alamos Field Office | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Appoints Kim Davis Lebak to Head Los Alamos Field Office January 15, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) has announced that Kim Davis Lebak will be the Los Alamos Field Office Manager effective January 2014. As Field Office Manager, Lebak will serve as the Secretary of Energy's senior representative on site at Los Alamos National Laboratory in New Mexico. "With her strong leadership skills and wide

  19. UC Davis Models: Geospatial Station Network Design Tool and Hydrogen Infrastructure Rollout Economic Analysis Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UC Davis Models Geospatial Station Network Design Tool & Hydrogen Infrastructure Rollout Economic Analysis Model (University of California-Davis) Objectives Analyze regional strategies for early rollout of hydrogen infrastructure in support of fuel cell vehicle commercialization. Estimate how many hydrogen fueling stations would be needed and how much it will cost to develop cost competitive hydrogen supply. Compare the cost of hydrogen from different types and sizes of hydrogen stations

  20. University of California, Davis, and Mass/Central America Win the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Affordability Contest and Stevens Institute of Technology Wins in Market Appeal at U.S. Department of Energy Solar Decathlon | Department of Energy California, Davis, and Mass/Central America Win the Affordability Contest and Stevens Institute of Technology Wins in Market Appeal at U.S. Department of Energy Solar Decathlon University of California, Davis, and Mass/Central America Win the Affordability Contest and Stevens Institute of Technology Wins in Market Appeal at U.S. Department of

  1. OSTIblog Posts by Lynn Davis | OSTI, US Dept of Energy Office of Scientific

    Office of Scientific and Technical Information (OSTI)

    and Technical Information Lynn Davis Lynn Davis's picture Information Scientist, HQ Program Liaison, and product manager for the National Library of Energy(Beta) Refreshed National Library of Energy(Beta) Takes on Expanded Role in Disseminating Department of Energy Scientific and Technical Information Published on May 29, 2014 The National Library of EnergyBeta (NLEBeta), a gateway to information across the U.S. Department of Energy (DOE), is taking on an expanded role in providing access to

  2. Kim Davis Lebak Returns to New Mexico, excited about joining Field Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kim Davis Lebak Returns to New Mexico, excited about joining Field Office Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Kim Davis Lebak returns to New Mexico, excited about joining Field Office A personal message from the DOE/NNSA Los Alamos Field Office Manager March 1, 2014 Kurt Steinhaus, Community Programs Office Director Kurt Steinhaus, Community Programs Office Director Contacts

  3. Evolution of spatial resolution in breast CT at UC Davis

    SciTech Connect (OSTI)

    Gazi, Peymon M.; Yang, Kai; Burkett, George W.; Aminololama-Shakeri, Shadi; Anthony Seibert, J.; Boone, John M.

    2015-04-15

    Purpose: Dedicated breast computed tomography (bCT) technology for the purpose of breast cancer screening has been a focus of research at UC Davis since the late 1990s. Previous studies have shown that improvement in spatial resolution characteristics of this modality correlates with greater microcalcification detection, a factor considered a potential limitation of bCT. The aim of this study is to improve spatial resolution as characterized by the modulation transfer function (MTF) via changes in the scanner hardware components and operational schema. Methods: Four prototypes of pendant-geometry, cone-beam breast CT scanners were designed and developed spanning three generations of design evolution. To improve the system MTF in each bCT generation, modifications were made to the imaging components (x-ray tube and flat-panel detector), system geometry (source-to-isocenter and detector distance), and image acquisition parameters (technique factors, number of projections, system synchronization scheme, and gantry rotational speed). Results: Characterization of different generations of bCT systems shows these modifications resulted in a 188% improvement of the limiting MTF properties from the first to second generation and an additional 110% from the second to third. The intrinsic resolution degradation in the azimuthal direction observed in the first generation was corrected by changing the acquisition from continuous to pulsed x-ray acquisition. Utilizing a high resolution detector in the third generation, along with modifications made in system geometry and scan protocol, resulted in a 125% improvement in limiting resolution. An additional 39% improvement was obtained by changing the detector binning mode from 2 × 2 to 1 × 1. Conclusions: These results underscore the advancement in spatial resolution characteristics of breast CT technology. The combined use of a pulsed x-ray system, higher resolution flat-panel detector and changing the scanner geometry and image

  4. UC Davis Fuel Cell, Hydrogen, and Hybrid Vehicle (FCH2V) GATE Center of Excellence

    SciTech Connect (OSTI)

    Erickson, Paul

    2012-05-31

    This is the final report of the UC Davis Fuel Cell, Hydrogen, and Hybrid Vehicle (FCH2V) GATE Center of Excellence which spanned from 2005-2012. The U.S. Department of Energy (DOE) established the Graduate Automotive Technology Education (GATE) Program, to provide a new generation of engineers and scientists with knowledge and skills to create advanced automotive technologies. The UC Davis Fuel Cell, Hydrogen, and Hybrid Vehicle (FCH2V) GATE Center of Excellence established in 2005 is focused on research, education, industrial collaboration and outreach within automotive technology. UC Davis has had two independent GATE centers with separate well-defined objectives and research programs from 1998. The Fuel Cell Center, administered by ITS-Davis, has focused on fuel cell technology. The Hybrid-Electric Vehicle Design Center (HEV Center), administered by the Department of Mechanical and Aeronautical Engineering, has focused on the development of plug-in hybrid technology using internal combustion engines. The merger of these two centers in 2005 has broadened the scope of research and lead to higher visibility of the activity. UC Davis's existing GATE centers have become the campus's research focal points on fuel cells and hybrid-electric vehicles, and the home for graduate students who are studying advanced automotive technologies. The centers have been highly successful in attracting, training, and placing top-notch students into fuel cell and hybrid programs in both industry and government.

  5. American Recovery & Reinvestment Act of 2009 (Recovery Act or ARRA) Davis-Bacon Act Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA Albuquerque Service Center Labor Standards Training March 9, 2015 Eva M. Auman eva.auman@hq.doe.gov 1 Labor Standards Statutes  The Davis-Bacon Act (DBA)  Davis-Bacon and Related Acts (DBRA)  Contract Work Hours and Safety Standards Act (CWHSSA)  Copeland "Anti-Kickback" Act (CA)  Walsh-Healey Public Contracts Act (PCA)  McNamara-O'Hara Service Contract Act(SCA)  Miller Act (MA)  Fair Labor Standards Act (FLSA) 2 Labor Standards - Presidential Executive

  6. John N. Bahcall and Raymond Davis, Jr., 2003 | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) John N. Bahcall and Raymond Davis, Jr., 2003 The Enrico Fermi Award Fermi Award Home Nomination & Selection Guidelines Award Laureates 2010's 2000's 1990's 1980's 1970's 1960's 1950's Ceremony The Life of Enrico Fermi Contact Information The Enrico Fermi Award U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-2411 E: Email Us 2000's John N. Bahcall and Raymond Davis, Jr., 2003 Print Text Size: A A A FeedbackShare Page

  7. Davis-Bacon Labor Rates for Weatherization Work in Multifamily Buildings

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program Notice 10-04 deals with labor rates (wages) for weatherization work in large multifamily buildings that comply with the Davis-Bacon Act requirements of the 2009 Recovery Act.

  8. Microsoft PowerPoint - Hydropower Meeting Dam Safety Program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Meeting Dam Safety Program Miles P. Waldron, P.E. Senior Hydropower Program Manager Southwestern Division 16 June 2015 BUILDING STRONG Transition to a Risk Informed Dam Safety ...

  9. EIS-0526: Lower Yellowstone Intake Diversion Dam Fish Passage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana EIS-0526: Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana ...

  10. Lower Yellowstone Intake Diversion Dam Fish Passage Project,...

    Energy Savers [EERE]

    ... The Corps (2015) analysis used acreages in the Yellowstone River from Intake Diversion Dam to Cartersville Dam available from GIS data developed for the Yellowstone River ...

  11. Lower Yellowstone Intake Diversion Dam Fish Passage Project,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix E ... Lower Yellowstone Intake Diversion Dam Fish Passage Project Appendix E Monitoring and ...

  12. Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement- Addendum June 2016 1 Addendum: Lower Yellowstone Intake Diversion Dam Fish ...

  13. Lower Yellowstone Intake Diversion Dam Fish Passage Project,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix F Correspondence Lower Yellowstone Intake Diversion Dam Correspondence Fish Passage Project ...

  14. Seismic Analysis of Morrow Point Dam

    SciTech Connect (OSTI)

    Noble, C R

    2002-04-01

    The main objective of this study is to perform nonlinear dynamic earthquake time history analyses on Morrow Point Dam, which is located 263 km southwest of Denver, Colorado. This project poses many significant technical challenges, one of which is to model the entire Morrow Point Dam/Foundation Rock/Reservoir system which includes accurate geology topography. In addition, the computational model must be initialized to represent the existing dead loads on the structure and the stress field caused by the dead loads. To achieve the correct dead load stress field due to gravity and hydrostatic load, the computer model must account for the manner in which the dams were constructed. Construction of a dam finite element model with the correct as-built geometry of the dam structure and simply ''turning on'' gravity in the computer model will generally lead to an incorrect initial stress field in the structure. The sequence of segmented lifts typical of dam construction has a significant impact on the static stress fields induced in the dam. In addition, the dam model must also account for the interaction between the adjacent dam segments across the dam contraction joints. As a result of these challenges, it was determined that a significant amount of code development was required in order to accurately simulate the motion of the dam structure. Modifications to the existing slide surfaces are needed to allow for appropriate modeling of the shear keys across the contraction joints. Furthermore, a model for hydrodynamic interaction was also implemented into NIKE3D and DYNA3D for fluid representation in the 3D dam system finite element model. Finally, the modeling of the 3D dam system results in a very large computational model, which makes it difficult to perform a static initialization using an implicit code. Traditionally, for these large models, the model has been initialized over a long time scale using an explicit code. However, recent advancements have made it possible

  15. Late-time structure of the Bunch-Davies de Sitter wavefunction

    SciTech Connect (OSTI)

    Anninos, Dionysios; Anous, Tarek; Freedman, Daniel Z.; Konstantinidis, George

    2015-11-30

    We examine the late time behavior of the Bunch-Davies wavefunction for interacting light fields in a de Sitter background. We use perturbative techniques developed in the framework of AdS/CFT, and analytically continue to compute tree and loop level contributions to the Bunch-Davies wavefunction. We consider self-interacting scalars of general mass, but focus especially on the massless and conformally coupled cases. We show that certain contributions grow logarithmically in conformal time both at tree and loop level. We also consider gauge fields and gravitons. The four-dimensional Fefferman-Graham expansion of classical asymptotically de Sitter solutions is used to show that the wavefunction contains no logarithmic growth in the pure graviton sector at tree level. Finally, assuming a holographic relation between the wavefunction and the partition function of a conformal field theory, we interpret the logarithmic growths in the language of conformal field theory.

  16. FWS: Dam Relicensing | Open Energy Information

    Open Energy Info (EERE)

    Dam Relicensing Abstract This web site provides a very brief introduction to the U.S. Fish and Wildlife's role and purpose in developing conditions for FERC-licensed hydropower...

  17. Revised Davis-Bacon Wage Determinations for the Weatherization Assistance Program

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program Notice 10-07 deals with wage determinations for states and U.S. territories that were issued by the U.S. Department of Labor for a new category of wage earners for weatherization that grantees will use to comply with the Davis-Bacon Act requirements under the 2009 Recovery Act

  18. Cloudy Skies W. Wiscombe and A. Davis NASA Goddard Space Flight Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    W. Wiscombe and A. Davis NASA Goddard Space Flight Center Climate & Radiation Branch Greenbelt, MD 20771 A. Marshak SSAI Lanham, MD 20706 Standard Gaussian-type statistics are not really adequate to describe atmospheric variability; this traditional approach implicitly dismisses fluctuations as "noise" of use only in computing a standard deviation which, together with the mean, presumably varies so little in space and time that one can meaningfully speak of

  19. Environmental Survey preliminary report, Laboratory for Energy-Related Health Research, Davis, California

    SciTech Connect (OSTI)

    Not Available

    1988-03-01

    This report presents the preliminary findings from the first phase of the Survey of the United States Department of Energy (DOE) Laboratory for Energy-Related Health Research (LEHR) at the University of California, Davis (UC Davis), conducted November 16 through 20, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LEHR. The Survey covers all environmental media and all areas of environmental regulation, and is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations at the LEHR and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the LEHR at UC Davis. The Interim Report will reflect the final determinations of the LEHR Survey. 75 refs., 26 figs., 23 tabs.

  20. University of California Davis West Village: The Largest Planned Net Zero Energy Community in the United States

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Community Renewable Energy (CommRE) success stories UC Davis net zero energy community; energy efficiency in buildings; PV and photovoltaics.

  1. Davis-Bacon Act Wage Rates for ARRA-Funded State Energy Program Projects Involving Residential Weatherization Work

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for Davis-Bacon Act (DBA) covered weatherization work performed under the State Energy Program (SEP) using American Recovery and Reinvestment Act of 2009 (ARRA) funds.

  2. Davis Bacon

    Office of Energy Efficiency and Renewable Energy (EERE)

    1.  We have several jobs that are not listed on the WD table for our State from the WDOL website. It is my understanding that the contractor requests the additional classification & rate once...

  3. Lac Courte Oreilles Hydro Dam Assessment

    SciTech Connect (OSTI)

    Weaver, Jason; Meyers, Amy

    2014-12-31

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  4. Hydropower Generators Will Deliver New Energy from an Old Dam

    Broader source: Energy.gov [DOE]

    City of Tacoma expands hydroelectric dam to produce more than 23,000 megawatt hours of electricity annually.

  5. PVC waterproofing membranes and alkali-aggregated reaction in dams

    SciTech Connect (OSTI)

    Scuero, A.M.

    1995-12-31

    A waterproofing polyvinylchloride (PVC) based geocomposite was installed on two dams subject to alkali-aggregate reaction, to eliminate water intrusion and to protect the facing from further deterioration. The installation system allows drainage of the infiltrated water, thus accomplishing dehydration of the dam body. On one dam, the membrane also provided protection for future slot cutting.

  6. White Oak Dam stability analysis. Volume I

    SciTech Connect (OSTI)

    Ahmed, S.B.

    1994-01-01

    A parametric study was conducted to evaluate the stability of the White Oak Dam (WOD) embankment and foundation. Slope stability analyses were performed for the upper and lower bound soil properties at three sections of the dam using the PCSTABL4 computer program. Minimum safety factors were calculated for the applicable seismic and static loading conditions. Liquefaction potential of the dam embankment and foundation solid during the seismic event was assessed by using simplified procedures. The WOD is classified as a low hazard facility and the Evaluation Basis Earthquake (EBE) is defined as an earthquake with a magnitude of m{sub b} = 5.6 and a Peak Ground Accelerator (PGA) of 0.13 g. This event is approximately equivalent to a Modified Mercalli Intensity of VI-VIII. The EBE is used to perform the seismic evaluation for slope stability and liquefaction potential. Results of the stability analyses and the liquefaction assessment lead to the conclusion that the White Oak Dam is safe and stable for the static and the seismic events defined in this study. Ogden Environmental, at the request of MMES, has checked and verified the calculations for the critical loading conditions and performed a peer review of this report. Ogden has determined that the WOD is stable under the defined static and seismic loading conditions and the embankment materials are in general not susceptible to liquefaction.

  7. Radial gate evaluation: Olympus Dam, Colorado

    SciTech Connect (OSTI)

    1997-06-01

    The report presents a structural analysis of the radial gates of Olympus Dam in eastern Colorado. Five 20-foot wide by 17-foot high radial gates are used to control flow through the spillway at Olympus Dam. The spillway gates were designed in 1947. The gate arm assemblies consist of two separate wide flange beams, with a single brace between the arms. The arms pivot about a 4.0-inch diameter pin and bronze graphite-insert bushing. The pin is cantilevered from the pier anchor girder. The radial gates are supported by a pin bearing on a pier anchor birder bolted to the end of the concrete pier. The gates are operated by two-part wire rope 15,000-pound capacity hoise. Stoplog slots upstream of the radial gates are provided in the concrete piers. Selected drawings of the gates and hoists are located in appendix A.

  8. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED STATE ENERGY PROGRAM (SEP) PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for all Davis-Bacon Act (DBA) covered-work, including weatherization work, performed under the State Energy (SEP) Program using American Recovery and Reinvestment Act of 2009 (ARRA) funds to ensure compliance with DBA requirements.

  9. Dams and Energy Sectors Interdependency Study, September 2011 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Dams and Energy Sectors Interdependency Study, September 2011 Dams and Energy Sectors Interdependency Study, September 2011 The U.S. Department of Energy (DOE) and the U.S. Department of Homeland Security (DHS) collaborated to examine the interdependencies between two critical infrastructure sectors - Dams and Energy. The study highlights the importance of hydroelectric power generation, with a particular emphasis on the variability of weather patterns and competing demands for

  10. Title 10 Chapter 43 Dams | Open Energy Information

    Open Energy Info (EERE)

    of Environmental Conservation, while powered dams fall under the jurisdiction of the public service board. Published NA Year Signed or Took Effect 1981 Legal Citation 10 VSA...

  11. Winter Hydroelectric Dam Feasibility Assessment: The Lac Courte...

    Broader source: Energy.gov (indexed) [DOE]

    WINTER HYDROELECTRIC DAM FEASIBILITY ASSESSMENT THE LAC COURTE OREILLES BAND OF LAKE ... IN 1920 AND COMPLETED BY 1923 THE HYDROELECTRIC FACILITY WAS BUILT IN 1988. ISSUES ...

  12. Jordan Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The proposed replacement would help improve fish passage and facilitate continued ... the existing diversion dam to help improve fish passage and facilitate continued ...

  13. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  14. Environmental impacts of increased hydroelectric development at existing dams

    SciTech Connect (OSTI)

    Railsback, S. F.; Cada, G. F.; Petrich, C. H.; Sale, M. J.; Shaakir-Ali, J. A.; Watts, J. A.; Webb, J. W.

    1991-04-01

    This report describes the environmental impacts of a proposed U.S. Department of Energy (DOE) initiative to promote the development of hydropower resources at existing dams. Hydropower development at existing dams has, in general, fewer impacts than development of additional fossil-fueled resources or hydropower at new dams, although potential cumulative impacts of developing multiple hydropower projects have not been explicitly addressed. Environmental review of project impacts and mitigation needs can ensure that additional hydropower development at existing dams can provide a renewable resource with fewer impacts than alternative resources.

  15. Dams and Energy Sectors Interdependency Study, September 2011...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    patterns and competing demands for water which determine the water available for hydropower production. Dams-Energy Interdependency Study.pdf More Documents & Publications 2014...

  16. U.S. Hydropower Potential from Existing Non-powered Dams | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy U.S. Hydropower Potential from Existing Non-powered Dams U.S. Hydropower Potential from Existing Non-powered Dams U.S. Hydropower Potential from Existing Non-powered Dams

  17. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  18. 2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Extension of Direct Load Management of Smart Loads Anna Scaglione, UC Davis GRA: Mahnoosh Alizadeh Project objective  Invent methods to "store" load demand for * Real-time "generation following" * Integration of load reserves as dispatchable assets in the Energy Market  Architecture for virtual "reserves" (queues) of electrical load demand * Watts to Job mapping (analysis)  Captures digitally the service requirements - Equal service type = Equal queue *

  19. Geomorphology and failure history of the earthquake-induced Farmington Siding landslide complex, Davis County, Utah

    SciTech Connect (OSTI)

    Lowe, M.; Harty, K.M. )

    1993-04-01

    The Farmington Siding landslide complex covers an area of 19.5 km[sup 2] in central Davis County. First identified and mapped in the 1970s, the feature was classified by previous researchers as a liquefaction-induced lateral spread based on surface geomorphology and exposures on the landslide complex. This was the first landslide in Utah to be attributed to earthquake-induced liquefaction. Geomorphic and geologic evidence indicate that the Farmington Sliding landslide complex likely consists of liquefaction-induced landslides that failed by means of both flow failure and lateral spreading. The landslide complex is located in an area underlain primarily by fine-grained deposits of Pleistocene Lake Bonneville and Holocene Great Salt Lake. Geomorphic features of the landslide complex include main and minor scarps, hummocks, closed depressions, and transverse lineaments. The main scarp consists mostly of a series of arcuate scallops near the left flank of the landslide, but it is a relatively linear, single scarp near the right flank of the landslide. Hummocks and closed depressions are most common near the head region of the landslide complex. Failure of the Farmington Sliding landslide complex has occurred at least twice. The older, distal portion of the landslide complex is cut by the Gilbert shoreline of the Bonneville lake cycle, indicating that landsliding occurred more than 10,000 years ago. In the younger portion of the landslide complex, landsliding has disrupted the Gilbert shoreline. Radiocarbon age estimates from trenches on a hummock near the main scarp of the younger landslide indicate that slope failure occurred sometime between about 2,730 [+-] 370 cal. yr B.P. and 4,530 [+-] 300 cal. yr B.P., possibly during the penultimate or antepenultimate surface-faulting earthquake on the Weber segment of the Wasatch fault zone.

  20. Quantifying and Generalizing Hydrologic Responses to Dam Regulation using a Statistical Modeling Approach

    SciTech Connect (OSTI)

    McManamay, Ryan A

    2014-01-01

    Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects of local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at

  1. TSSGNEO suggestions for refinement of safety criteria for dam at the Sayano-Shushenskaya HPP

    SciTech Connect (OSTI)

    Savich, A. I.; Gaziev, E. G.

    2013-09-15

    Analysis of radial-displacements of the dam, measured by direct and inverted plumb lines, indicates that curves of the variation in radial displacements of the dam at different elevations make it possible to plot diagrams of increases in the radial displacement over the entire height of the dam, i.e., inclines of the axis of the dam to the vertical.

  2. Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-06-04

    This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

  3. Title 33 USC 401 Construction of Bridges, Causeways, Dams or...

    Open Energy Info (EERE)

    1 Construction of Bridges, Causeways, Dams or Dikes Generally; Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title...

  4. United States Society on Dams 2015 Fall Workshops

    Broader source: Energy.gov [DOE]

    USSD Technical Committees will present four Workshops on November 2-4, 2015. The Workshops will address important issues faced by U.S. and international dam engineering professionals. Plan to join...

  5. Title 10, Chapter 43 Dams | Open Energy Information

    Open Energy Info (EERE)

    of dams in Vermont. Published NA Year Signed or Took Effect 1981 Legal Citation 10 V.S.A. 1080 et seq. DOI Not Provided Check for DOI availability: http:crossref.org...

  6. Non-Powered Dams Resource Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications An Assessment of Energy Potential at Non-Powered Dams in the United States NSD Methodology Report New Stream-reach Development (NSD) Final Report and

  7. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    SciTech Connect (OSTI)

    Paluch, Mark; Scholz, Allan; McLellan, Holly; Olson, Jason

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  8. Classification of US hydropower dams by their modes of operation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; Bevelhimer, Mark S.

    2016-02-19

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  9. The Sensor Fish - Making Dams More Salmon-Friendly

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Duncan, Joanne P.; Gilbride, Theresa L.; Keilman, Geogre

    2004-07-31

    This article describes the Sensor Fish, an instrument package that travels through hydroelectric dams collecting data on the hazardous conditions that migrating salmon smolt encounter. The Sensor Fish was developed by Pacific Northwest National Laboratory with funding from DOE and the US Army Corps of Engineers and has been used at several federal and utility-run hydroelectric projects on the Snake and Columbia Rivers of the US Pacific Northwest. The article describes the evolution of the Sensor Fish design and provides examples of its use at McNary and Ice Harbor dams.

  10. 16 USC 797c - Dams in National Park System Units | Open Energy...

    Open Energy Info (EERE)

    16 USC 797c - Dams in National Park System Units Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 16 USC 797c - Dams in National...

  11. The use of performance parameters in monitoring the safety of dams experiencing alkali-aggregate reaction

    SciTech Connect (OSTI)

    Veesaert, C.J.; LaBoon, J.H.

    1995-12-31

    As the Bureau of Reclamation (Reclamation) moves away from design and construction of new water resource projects toward optimizing the management of existing water resource projects, monitoring the condition of high risk structures such as dams becomes very important. To address this need, Reclamation has developed a logical approach of monitoring the safety of a dam over time. This approach analyzes visual and instrumentation performance parameters unique to each dam, Performance parameters specify the expected performance (behavior) of both embankment and concrete dams, including those concrete dams effected by alkali-aggregate reaction. This paper presents an overview of the concept of performance parameters in monitoring the safety of dams, which have experienced alkali-aggregate reaction. Three case studies are presented to illustrate the use of performance parameters in monitoring a dam`s behavior over time, relative to the effects of alkali-aggregate reaction.

  12. DAVIS-BACON ACT WAGE RATES FOR ARRA-FUNDED ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) PROGRAM PROJECTS INCLUDING RESIDENTIAL WEATHERIZATION WORK

    Broader source: Energy.gov [DOE]

    Guidance on using appropriate prevailing wage rates for all Davis-Bacon Act (DBA) covered-work, including weatherization work, performed under the Energy Efficiency and Conservation Block Grants (EECBG) Program using American Recovery and Reinvestment Act of 2009 (ARRA) funds to ensure compliance with DBA requirements.

  13. EERE Success Story—Hydropower Generators Will Deliver New Energy from an Old Dam

    Office of Energy Efficiency and Renewable Energy (EERE)

    City of Tacoma expands hydroelectric dam to produce more than 23,000 megawatt hours of electricity annually.

  14. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  15. Operation of Glen Canyon Dam environmental impact statement

    SciTech Connect (OSTI)

    O`Hare, K.

    1995-12-31

    The final environmental impact statement (EIS) on the operation of Glen Canyon Dam was filed with the Environmental Protection Agency (EPA) by the Bureau of Reclamation on March 21, 1995. The poster display depicts this highly complex EIS process and its results.

  16. Optimization of Hydroacoustic Equipment Deployment at Foster Dam, 2013

    SciTech Connect (OSTI)

    Hughes, James S.; Johnson, Gary E.; Ploskey, Gene R.; Hennen, Matthew J.; Fischer, Eric S.; Zimmerman, Shon A.

    2013-03-01

    The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Foster Dam (FOS) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. Optimization of the hydroacoustic systems will establish methodology for sampling by active acoustic methods during this year-long evaluation of juvenile salmonid passage at FOS.

  17. Enloe Dam Passage Project, Volume I, 1984 Annual Report.

    SciTech Connect (OSTI)

    Fanning, M.L.

    1985-07-01

    This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

  18. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect (OSTI)

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  19. Compliance Monitoring of Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Johnson, Gary E.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at The Dalles Dam during summer 2012. Under the 2008 Federal Columbia River Power System Biological Opinion, dam passage survival is required to be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated survival from the forebay 2 km upstream of the dam and through the tailrace to 2 km downstream of the dam, forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required by the 2008 Columbia Basin Fish Accords.

  20. EIS-0477: San Juan Basin Energy Connect Project, San Juan County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the potential environmental impacts of a proposal to construct a 230-kilovolt transmission line from the Farmington area in northwest New Mexico to Ignacio, Colorado, to relieve ...

  1. DOE/EA-1683: Finding of No Significant Impact Department of Energy...

    Office of Environmental Management (EM)

    plant (Solana Generating Plant) and associated 230 kilovolt transmission line (Solana Gen-Tie) proposed by Abengoa Solar Inc. (Abengoa) near Gila Bend, Arizona (Solana Project)....

  2. EA-1683: Finding of No Significant Impact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    assessment that analyzed the potential environmental impacts associated with a 280 megawatt concentrating solar power plant and associated 230 kilovolt transmission line. ...

  3. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt ...

  4. Microsoft Word - 9-22-11 Final Testimony _Azar_.DOCX

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of renewables onto the grid. To date, three projects have been approved: Montana Alberta Tie, Ltd., a 214-mile, 230-kilovolt single-circuit alternating current transmission...

  5. EIS-0294: Record of Decision

    Broader source: Energy.gov [DOE]

    Interconnection of the Sutter Power Project With the Western Area Power Administration’s Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line (June 1999)

  6. Cost of presumptive source term Remedial Actions Laboratory for energy-related health research, University of California, Davis

    SciTech Connect (OSTI)

    Last, G.V.; Bagaasen, L.M.; Josephson, G.B.; Lanigan, D.C.; Liikala, T.L.; Newcomer, D.R.; Pearson, A.W.; Teel, S.S.

    1995-12-01

    A Remedial Investigation/Feasibility Study (RI/FS) is in progress at the Laboratory for Energy Related Health Research (LEHR) at the University of California, Davis. The purpose of the RI/FS is to gather sufficient information to support an informed risk management decision regarding the most appropriate remedial actions for impacted areas of the facility. In an effort to expedite remediation of the LEHR facility, the remedial project managers requested a more detailed evaluation of a selected set of remedial actions. In particular, they requested information on both characterization and remedial action costs. The US Department of Energy -- Oakland Office requested the assistance of the Pacific Northwest National Laboratory to prepare order-of-magnitude cost estimates for presumptive remedial actions being considered for the five source term operable units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and maintenance (O&M) costs. These cost estimates are intended to aid planning and direction of future environmental remediation efforts.

  7. EA-2017: Braddock Locks and Dam Hydro Electric Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Hydro Green Energy, LLC to fabricate, install, and operate one interchangeable Modular Bulb Turbine (MBT) which would be inserted in a Large Frame Module (LFM) at the existing Braddock Locks and Dam. The installation would be part of a larger project that would include the design and installation of seven MBTs to create a 5.2 megawatt, low head hydropower system at Braddock Locks and Dam. An Environmental Assessment (EA) previously prepared by the Federal Energy Regulatory Commission (FERC) has been adopted by DOE pursuant to the requirements of the National Environmental Policy Act (NEPA).

  8. Turbocharger with sliding piston, and having vanes and leakage dams

    DOE Patents [OSTI]

    Roberts, Quentin; Alnega, Ahmed

    2011-12-06

    A turbocharger having a sliding piston for regulating exhaust gas flow into the turbine wheel includes a set of first vanes mounted on a fixed first wall of the turbine nozzle and projecting axially toward an opposite second wall of the nozzle, and/or a set of second vanes mounted on the end of the piston and projecting in an opposite axial direction toward the first wall of the nozzle. For the/each set of vanes, there are leakage dams formed on the wall that is adjacent the vane tips when the piston is closed. The leakage dams are closely adjacent the vane tips and discourage exhaust gas from leaking in a generally radial direction past the vane tips as the piston just begins to open from its fully closed position.

  9. Rock Island Dam Smolt Monitoring; 1994-1995 Annual Report.

    SciTech Connect (OSTI)

    Truscott, Keith B.; Fielder, Paul C.

    1995-10-01

    Downstream migrating salmon and steelhead trout (Oncorhynchus spp.) smolts were monitored at the Rock Island Dam bypass trap from April 1 - August 31, 1954. This was the tenth consecutive year that the bypass trap was monitored. Data collected included: (1) number of fish caught by species, (2) number of adipose clipped and/or Passive Integrated Transponder (PIT) tagged fish caught by species, (3) daily average riverflow, (4) daily average powerhouse No. 1 and No. 2 flows and daily average spill. These data were transmitted to the Fish Passage Center, which manages the Smolt Monitoring Program throughout the Columbia River Basin. The Smolt Monitoring Program is used to manage the {open_quotes}water budget{close_quotes}, releasing upstream reservoir water storage allocated to supplement river flows to enhance survival of downstream migrating juvenile salmonids. The Rock Island Dam trapping facility collected 37,795 downstream migrating salmonids in 1994. Collected fish included 4 yearling and 4 sub-yearling chinook salmon (O. tshawytscha) that had been previously PIT tagged to help determine migration rates. Additionally, 1,132 sub-yearling chinook, 4,185 yearling chinook, 6,627 steelhead, (O. mykiss) and 422 sockeye (O. nerka) with clipped adipose fins were collected. The middle 80% of the 1994 spring migration (excluding sub-yearling chinooks) passed Rock Island Dam during a 34 day period, April 25 - May 28. Passage rates of chinook and steelhead smolts released from hatcheries and the downstream migration timing of all salmonids are presented. The spring migration timing of juvenile salmonids is strongly influenced by hatchery releases above Rock Island Dam.

  10. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  11. Gene Wash and Copper Basin Dams are surviving alkali-aggregate reaction

    SciTech Connect (OSTI)

    Hill, C.J.

    1995-12-31

    Gene Wash and Copper Basin Dams were constructed in 1937 and 1938, and are owned and operated by the Metropolitan Water District of Southern California (MWD). The dams are located in San Bernardino County, California, close to the Colorado River, and very close to the easternmost point of California. They form two intermediate storage facilities on the Colorado River Aqueduct system which conveys water from Lake Havasu to the Los Angeles and San Diego areas. The locations of the dams are shown. Gene Wash Dam is a concrete arch structure, with a maximum height of arch of 131 feet. There is a gravity thrust block on the right abutment and the total crest length is 430 feet. Copper Basin Dam is a concrete arch dam with a maximum height of arch of 187 feet and a crest length of 253 feet. Plans, elevations and sections for both dams. The dams are in the Whipple Mountains at the eastern edge of the Mojave Desert. Between June and October, maximum temperatures usually exceed 100 degrees Farenheit, while daily low temperatures in this period are generally in the 60`s and 70`s. Winter temperatures are mild, with daytime highs in the 70`s and 80`s, and lows only occasionally below freezing. The area is arid, with total annual rainfall generally between two and ten inches. Both dams were built in desert washes with no permanent flow. The foundation for both structures is a strong, erosion-resistant, red-brown, non-marine sandstone and conglomerate of Tertiary age known as the Copper Basin Formation (Buwalda, 1937). Spillways for both dams are ungated ogee crests, which are separate from the dams. Gene Wash Dam and Copper Basin Dam are geographically close together, are of similar design, and were constructed at the same time, using the same materials. Their performance since construction, not surprisingly, has been similar.

  12. Compliance Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2010

    SciTech Connect (OSTI)

    Johnson, Gary E.; Carlson, Thomas J.; Skalski, John R.

    2010-12-21

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon smolts at The Dalles Dam during summer 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 2 km below the dam The forebay-to-tailrace survival estimate satisfies the “BRZ-to-BRZ” survival estimate called for in the Fish Accords. , as well as the forebay residence time, tailrace egress time, and spill passage efficiency, as required in the Columbia Basin Fish Accords. The estimate of dam survival for subyearling Chinook salmon at The Dalles in 2010 was 0.9404 with an associated standard error of 0.0091.

  13. Notice of Intent: Innovative Technologies to Advance Non-Powered Dams and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pumped-Storage Hydropower Development | Department of Energy Innovative Technologies to Advance Non-Powered Dams and Pumped-Storage Hydropower Development Notice of Intent: Innovative Technologies to Advance Non-Powered Dams and Pumped-Storage Hydropower Development July 11, 2016 - 2:39pm Addthis Notice of Intent: Innovative Technologies to Advance Non-Powered Dams and Pumped-Storage Hydropower Development The Energy Department's Water Power Program intends to issue a Funding Opportunity

  14. Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana - Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement- Addendum June 2016 1 Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement Introduction The Corps of Engineers (Corps) and the Bureau of Reclamation (Reclamation) have prepared this addendum to the Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Environmental Impact Statement (EIS) to provide the public with the

  15. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Modification Project, Montana DRAFT APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis MAY 2016 Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft

  16. An Assessment of Energy Potential at Non-Powered Dams in the United States

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy An Assessment of Energy Potential at Non-Powered Dams in the United States An Assessment of Energy Potential at Non-Powered Dams in the United States An Assessment of Energy Potential at Non-Powered Dams in the United States- The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower producing facilities represent only a fraction of the infrastructure development that has taken place on the nation's waterways.

  17. Estimating the seismic stability of the arch dam in the Chirkeiskaya hydrosystem

    SciTech Connect (OSTI)

    Khrapkov, A. A.; Skomorovskaya, E. Ya

    2004-11-15

    A calculation analysis of the arch dam constructed in an area with standardized seismicity of magnitude 9-10 is presented.

  18. Glen Canyon Dam Long-Term Experimental and Management Plan DEIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 23 24 * Hydropower is a renewable resource that is an ... Canyon Dam capacity and energy generation is maintained ... R Foundation 4 for Statistical Computing, Vienna, Austria. ...

  19. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  20. Ryan Davis | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Biochemical conversion process pathways Algal biomass production and conversion pathways Hydroprocessing technologies Affiliated Research Programs Biochemical AnalysisTEA Modeling ...

  1. Rich Davies- Biography

    Broader source: Energy.gov [DOE]

    As the Project Lifecycle Steward at PNNL, he has provided leadership and management to more effectively and efficiently enable the conduct of research and development.

  2. EIS-0352: U.S. 93 Hoover Dam Bypass Project

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) served as a cooperating agency for this Federal Highway Administration Environmental Impact Statement (EIS) due to WAPA’s role in the relocation of several transmission lines. The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for construction of a new segment of U.S. Highway 93 for the purpose of improving congestion and hazardous vehicle/pedestrian conflicts where the highway crosses the Colorado River over Hoover Dam. As a cooperating agency for the EIS, WAPA proposed modifications to its transmission system and facilities to accommodate the construction of the new highway and bridge spanning the Colorado River.

  3. Assessing the Hydro Dam at Lac Courte Oreilles

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Assessing the Hydro Dam at Lac Courte Oreilles" Lac Courte Oreilles Band of Lake Superior Ojibwe Leslie Isham, Director, LCO Energy Project Assistant Director, LCO Public Works 9796N Cty. Hwy K Hayward, WI 54843 About Lac Courte Oreilles (LCO) * Located in upper Northwest Wisconsin * Land base is about 76,000 acres * 7,275 members * Adopted Kyoto Protocol in 2005 * Land Use Comprehensive Plan adopted in 2006 * 2008 DOE First Steps Grant Awarded LCO Tribal Mission We, the Anishinaabeg,

  4. TEAM CUMBERLAND Kentucky Dam Village State Resort Park

    Office of Environmental Management (EM)

    TCU_Report_FY2010.pdf TCU_Report_FY2010.pdf (188.6 KB) More Documents & Publications HSI_Annual_Report_FY2010.pdf Inspection Letter Report: INS-L-09-04 Fiscal Year 2009 Annual Federal Performance Report on Executive Agency Actions to Assist Tribal Colleges and Universities

    TEAM CUMBERLAND Kentucky Dam Village State Resort Park 113 Administration Drive, Gilbertsville, KY 42044 April 6, 2016 On Tuesday, April 5 th , Team Cumberland attendees are invited to gather in the lobby of the lodge

  5. Vulnerability of Karangkates dams area by means of zero crossing analysis of data magnetic

    SciTech Connect (OSTI)

    Sunaryo, E-mail: sunaryo.geofis.ub@gmail.com; Susilo, Adi

    2015-04-24

    Study with entitled Vulnerability Karangkates Dam Area By Means of Zero Crossing Analysis of Data Magnetic has been done. The study was aimed to obtain information on the vulnerability of two parts area of Karangkates dams, i.e. Lahor dam which was inaugurated in 1977 and Sutami dam inaugurated in 1981. Three important things reasons for this study are: 1). The dam age was 36 years old for Lahor dam and 32 years old for Sutami dam, 2). Geologically, the location of the dams are closed together to the Pohgajih local shear fault, Selorejo local fault, and Selorejo limestone-andesite rocks contact plane, and 3). Karangkates dams is one of the important Hydro Power Plant PLTA with the generating power of about 400 million KWH per year from a total of about 29.373MW installed in Indonesia. Geographically, the magnetic data acquisition was conducted at coordinates (112.4149oE;-8.2028oS) to (112.4839oE;-8.0989oS) by using Proton Precession Magnetometer G-856. Magnetic Data acquisition was conducted in the radial direction from the dams with diameter of about 10 km and the distance between the measurements about 500m. The magnetic data acquisition obtained the distribution of total magnetic field value in the range of 45800 nT to 44450 nT. Residual anomalies obtained by doing some corrections, including diurnal correction, International Geomagnetic Reference Field (IGRF) correction, and reductions so carried out the distribution of the total magnetic field value in the range of -650 nT to 700 nT. Based on the residual anomalies, indicate the presence of 2 zones of closed closures dipole pairs at located in the west of the Sutami dam and the northwest of the Lahor dam from 5 total zones. Overlapping on the local geological map indicated the lineament of zero crossing patterns in the contour of residual anomaly contour with the Pohgajih shear fault where located at about 4 km to the west of the Sutami dam approximately and andesite-limestone rocks contact where located

  6. Technical evaluation of the noise and isolation testing of the reactor protection system for the Davis Besse Nuclear Power Station, Unit 1

    SciTech Connect (OSTI)

    Selan, J.C.

    1980-01-01

    This report documents the technical evaluation of the noise and isolation testing of the reactor protection system (RPS) for the Davis Besse Nuclear Power Station, Unit 1. The testing was performed in accordance to Section 4.6.11, Susceptibility, of MIL-N-19900B, and NRC approved plant test methods. Analysis of the test results shows that the reactor protection system did not degrade below acceptable levels when subjected to electromagnetic, electrostatic, isolation and noise level tests, nor was the system's ability to perform its Class 1E protective functions affected.

  7. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    SciTech Connect (OSTI)

    Hadjerioua, Boualem; Pasha, MD Fayzul K; Stewart, Kevin M; Bender, Merlynn; Schneider, Michael L.

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and

  8. Using causal maps to support ex-post assessment of social impacts of dams

    SciTech Connect (OSTI)

    Aledo, Antonio; García-Andreu, Hugo; Pinese, José

    2015-11-15

    - Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.

  9. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    SciTech Connect (OSTI)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M; Hill, David E

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  10. CX-006253: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line MaintenanceCX(s) Applied: B4.13Date: 06/14/2011Location(s): Clark County, WashingtonOffice(s): Bonneville Power Administration

  11. Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

    SciTech Connect (OSTI)

    Stadler, Michael; Marnay, Chris; Donadee, Jon; Lai, Judy; Megel, Olivier; Bhattacharya, Prajesh; Siddiqui, Afzal

    2011-02-06

    Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of

  12. Recreation and jobs in the Glen Canyon Dam region

    SciTech Connect (OSTI)

    Douglas, A.J.; Harpman, D.A.

    1995-12-31

    Natural resource economists have estimated the nonmarket benefits provided by streamflows in several recent research papers. The current paper also examines the economic implications of water based recreational activities. The analysis uses a software package and database called IMPLAN to estimate the jobs impacts of expenditures for recreation trips to the Lee`s Ferry reach on the Colorado River. The discussion describes the basic input-output model and water based recreation activities at the Lee`s Ferry reach. Non-resident river recreation trip expenditures to the Glen Canyon Dam region generate 585 jobs. The estimates presented here add further credence and policy weight to the premise that the outdoor recreation sector of the economy is relatively labor intensive.

  13. Precision welding cuts downtime at Grand Coulee Dam

    SciTech Connect (OSTI)

    Light, S.; White, E.

    1997-03-01

    The three large 700-MW generators at Grand Coulee Dam--originally built and installed by Canadian General Electric in the late 1970s--are being upgraded using precision welding techniques and leading edge installation technology. These generators suffered from numerous water leaks at and around the bar water connections, resulting in a significant number of forced repair outages that were increasing in frequency. The US Bureau of Reclamation, in conjunction with the Bonneville Power Administration, decided to overhaul these machines. The design from Siemens Power Corp. provided state-of-the-art materials and included a rating increase from 700 to 805 MW, which would make these three machines the highest output single-unit hydrogenerators in the world. The upgrade was to be accomplished with only the replacement of the stator components; there would be no changes to the rotating element. The cost for all three machines is approximately $27.5 million. This project is described in this paper.

  14. Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.

    SciTech Connect (OSTI)

    DosSantos, Joe; Vashro, Jim; Lockard, Larry

    1994-06-01

    In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull trout redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.

  15. Microsoft PowerPoint - AWEA08-pitch1.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acknowledgments Acknowledgments UC Davis UC Davis - - Professor Case van Dam Professor Case van Dam - - M. Leal M. Leal - - J.P. Baker J.P. Baker Sandia National Laboratories ...

  16. CX-012735: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  17. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  18. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  19. Engineering theory of slide processes in the design of earth dams on a soft ground foundation

    SciTech Connect (OSTI)

    Krasil'nikov, N.A.

    1987-11-01

    This paper discusses the slope stability and landslide propensity of several hydroelectric plant earth dams throughout the Soviet Union from the standpoint of slide theory and compares the research of several Soviet institutions into this problem with existing standards and recommendations on dam stability and reliability. The comparisons are made for earth dams having a soft ground foundation under static loading conditions. Applicable properties are discussed for a wide range of soils and rocks including clays, loams, sands, alluvials, and soft and hard gravels. Seismic effects are not discussed.

  20. Integrated automation of the New Waddell Dam performance data acquisition system

    SciTech Connect (OSTI)

    Welch, L.R.; Fields, P.E.

    1999-07-01

    New Waddell Dam, a key feature of the US Bureau of Reclamation's Central Arizona Project, had elements of its dam safety data acquisition system incorporated into the design and construction. The instrumentation array is a reflection of the dam's large size and foundation complexity. Much of the instrumentation is automated. This automation was accomplished while maintaining independent communication connections to major divisions of the instrument array. Fiber optic cables are used to provide high Quality data, free from voltage surges that could originate in a nearby powerplant switchyard or from lightning. The system has been working well but there are concerns with a lack of continued equipment manufacturer support.

  1. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  2. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  3. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    SciTech Connect (OSTI)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  4. Acoustic Doppler Current Profiler Surveys of Velocity Downstream of Albeni Falls Dam

    SciTech Connect (OSTI)

    Perkins, William A.; Titzler, P. Scott; Richmond, Marshall C.; Serkowski, John A.; Kallio, Sara E.; Bellgraph, Brian J.

    2010-09-30

    The U.S. Army Corps of Engineers (USACE), Seattle District, is studying the potential to locate fish bypass systems at Albeni Falls Dam. The USACE requested Pacific Northwest National Laboratory (PNNL) to survey velocity magnitude and direction in the dam tailrace. The empirical data collected will be used to support future numerical modeling, physical modeling, and evaluation of fish bypass system alternatives. In May 2010, PNNL conducted velocity surveys of the Albeni Falls Dam using a boat-mounted acoustic Doppler current profiler. The surveys were conducted over three days (May 25 through 27). During the survey period, total river discharge at the dam varied between 30.2 and 31.0 kcfs. A small amount of spill discharge, 2 kcfs, was present on two days (May 26 and 27). This report presents data plots showing measured velocity direction and magnitude averaged over the entire depth and over 5-ft depth increments from 5 to 30 ft.

  5. MODELING OF LONG-TERM FATE OF MOBILIZED FINES DUE TO DAM-EMBANKMENT...

    Office of Scientific and Technical Information (OSTI)

    MODELING OF LONG-TERM FATE OF MOBILIZED FINES DUE TO DAM-EMBANKMENT INTERFACIAL DISLOCATIONS Citation Details In-Document Search Title: MODELING OF LONG-TERM FATE OF MOBILIZED ...

  6. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix E Monitoring and Adaptive Management i Contents 1.0 Introduction ............................................................................................................................. 1 Project Goal and Objectives ................................................................................................... 1 2.0 Rock

  7. Glen Canyon Dam Long-Term Experimental and Management Plan DEIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... for water delivery and the generation of 13 hydroelectric power. 14 15 16 ES.2.2 Objectives ... the Aspinall Unit, a series of three hydropower dams on 42 the Gunnison River. ...

  8. An Assessment of Energy Potential at Non-Powered Dams in the United States

    SciTech Connect (OSTI)

    Hadjerioua, Boualem

    2012-04-01

    This document provides results from a nation-scale analysis to determine the potential capacity and generation available from adding power production capability to U.S. non-powered dams.

  9. Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010

    SciTech Connect (OSTI)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

  10. Finite element analysis of three TVA dams with alkali-aggregate reaction

    SciTech Connect (OSTI)

    Grenoble, B.A.; Meisenheimer, J.K.; Wagner, C.D.; Newell, V.A.

    1995-12-31

    Three large Tennessee Valley Authority (TVA) dams are currently experiencing problems caused by alkali-aggregate reaction (AAR). Since the fall of 1990, engineers in Stone & Webster`s Denver, Colorado office have been working with TVA to evaluate how AAR is affecting the dams and to identify measures for controlling the adverse effects of the concrete growth. This paper provides an overview of how finite element analysis is being used to understand the affects of AAR on these structures and to evaluate alternatives for minimizing the adverse effects of the concrete growth. Work on Hiwassee Dam is essentially complete, while that on the Chickamauga and Fontana Projects is still in progress. Consequently, this paper will focus primarily on Hiwassee Dam. The ongoing work on the other two projects will only be discussed briefly.

  11. MODELING OF LONG-TERM FATE OF MOBILIZED FINES DUE TO DAM-EMBANKMENT...

    Office of Scientific and Technical Information (OSTI)

    Conference: MODELING OF LONG-TERM FATE OF MOBILIZED FINES DUE TO DAM-EMBANKMENT INTERFACIAL DISLOCATIONS Citation Details In-Document Search Title: MODELING OF LONG-TERM FATE OF ...

  12. Surface and subsurface soils at the Pond B dam: July 1998

    SciTech Connect (OSTI)

    Halverson, N.V.

    1999-12-03

    Pond B, 685-13G, is an inactive reactor cooling impoundment built in 1961 on the Savannah River Site (SRS). Between 1961 and 1964, Pond B received R-Reactor cooling water discharges that were contaminated with {sup 137}Cs, {sup 90}Sr and plutonium. Though the pond has not been used since 1964, radionuclides from the contaminated cooling water remain in the water and in the surface sediments of the pond. The current proposal to fix and repair the Pond B dam structure includes installing a new drain system and monitoring equipment. The dam will be reinforced with additional previous material on the downstream face of the dam. The objectives of this report are to describe the sampling methodology used during the July 1998 sampling event at the downstream face of the Pond B dam and in Pond B, present the results of the sampling event, and compare, where possible, these results to related risk-based standards.

  13. Optimization of Hydroacoustic Equipment Deployments at Lookout Point and Cougar Dams, Willamette Valley Project, 2010

    SciTech Connect (OSTI)

    Johnson, Gary E.; Khan, Fenton; Ploskey, Gene R.; Hughes, James S.; Fischer, Eric S.

    2010-08-18

    The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Lookout Point Dam (LOP) and the acoustic imaging system at Cougar Dam (CGR) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. The general approach was a multi-step process from mount design to final system configuration. The optimization effort resulted in successful deployments of hydroacoustic equipment at LOP and CGR.

  14. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix F Correspondence Lower Yellowstone Intake Diversion Dam Correspondence Fish Passage Project Appendix F Attachment 1 Correspondence Distributed DEPARTM ENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT 1616 CAPITOL AVENUE OMAHA NE 68102-4901 April 5, 2016 District Commander Mr. Lester Randall, Chairman Kickapoo Tribe in Kansas PO Box 271 1107 Goldfinch Road Horton, Kansas 66439 Dear Chairman Randall: The U.S.

  15. EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam

    Office of Energy Efficiency and Renewable Energy (EERE)

    Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency.

  16. Second international conference on alkali-aggregate reactions in hydroelectric plants and dams

    SciTech Connect (OSTI)

    1995-12-31

    This document is the report of the Second International Conference on Alkali-Aggregate Reactions in Hydroelectric Plants and Dams. This conference was held in October 1995 in Chattanooga, TN and sponsored by the Tennessee Valley Authority. Thirty five papers were presented, with technical sessions covering: (1) The TVA experience, (2) AAR in Hydroelectric Powerplants, (3) AAR in Dams and Spillways, and (4) Long-term management of AAR. Additionally, there were several workshop sessions.

  17. EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT

    Broader source: Energy.gov [DOE]

    The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

  18. Hydropower and the environment: A case study at Glen Canyon Dam

    SciTech Connect (OSTI)

    Wegner, D.L.

    1995-12-31

    The management of hydroelectric resources in the Colorado River requires a balancing of hydrologic, social, natural and cultural resources. The resulting management often has to deal with inherently conflicting objectives, short and long-term goals, time frames and operational flexibility. Glen Canyon Dam, AZ, on the Colorado River, controls the release of water into the Grand Canyon. The dam has been under intense public scrutiny since it was completed in 1963. An Environmental Impact Statement evaluating the future operations and options for Glen Canyon Dam was initiated by the Department of the Interior in 1989 and completed in 1995. An Adaptive Management approach to future operational management has been developed as part of the Glen Canyon Dam Environmental Impact Statement process. Future operations at Glen Canyon Dam will take into consideration the need to balance water movement and hydroelectricity development with natural, recreation, Native American and cultural needs. Future management of rivers requires acknowledgement of the dynamic nature of ecosystems and the need to link scientific information into the decision-making process. Lessons learned and programs developed at Glen Canyon Dam may be applied to other river systems.

  19. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Skalski, John R.

    2010-10-01

    The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

  20. Optimization of Hydroacoustic Deployments at John Day Dam

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Cook, Christopher B.; Titzler, P. Scott; Moursund, Russell A.

    2002-11-12

    This report describes short-term studies conducted in late November and early December 2001 to optimize hydroacoustic sampling techniques for John Day Dam before the 2002 fish passage efficiency (FPE) study. Knowledge gained in this study should significantly improve hydroacoustic sampling and the accuracy of estimates of fish passage at two locations that have presented problems in past studies. The spillway has been most problematic because many fish detected there were not entrained. Without correction, non-commitment of fish can result in multiple detections and overestimation of fish passage and FPE. Trash-rack-mounted, down-looking transducers for sampling unguided fish at a submerged traveling screen (STS) also have posed problems because the beam was aimed so far downstream that researchers had concerns about fish aspect and detectability. The deployments, aiming angles, and ping rates described here should eliminate all problems encountered in previous studies. This report describes hydroacoustic evaluations. The spill-bay deployment identified in this study should completely eliminate multiple detections of fish by limiting the sample volume for counting fish to the deep high-discharge volume adjacent to the gate. Results from testing of transducers deployed in a turbine intake with an STS suggest that, after testing in 2002, it may be possible to cut the number of powerhouse transducers sampling STS units by 50% or to double the spatial sampling coverage with the same number of transducers, all while improving detectability.

  1. The Dalles Dam, Columbia River: Spillway Improvement CFD Study

    SciTech Connect (OSTI)

    Cook, Chris B.; Richmond, Marshall C.; Serkowski, John A.

    2006-06-01

    This report documents development of computational fluid dynamics (CFD) models that were applied to The Dalles spillway for the US Army Corps of Engineers, Portland District. The models have been successfully validated against physical models and prototype data, and are suitable to support biological research and operations management. The CFD models have been proven to provide reliable information in the turbulent high-velocity flow field downstream of the spillway face that is typically difficult to monitor in the prototype. In addition, CFD data provides hydraulic information throughout the solution domain that can be easily extracted from archived simulations for later use if necessary. This project is part of an ongoing program at the Portland District to improve spillway survival conditions for juvenile salmon at The Dalles. Biological data collected at The Dalles spillway have shown that for the original spillway configuration juvenile salmon passage survival is lower than desired. Therefore, the Portland District is seeking to identify operational and/or structural changes that might be implemented to improve fish passage survival. Pacific Northwest National Laboratory (PNNL) went through a sequence of steps to develop a CFD model of The Dalles spillway and tailrace. The first step was to identify a preferred CFD modeling package. In the case of The Dalles spillway, Flow-3D was as selected because of its ability to simulate the turbulent free-surface flows that occur downstream of each spilling bay. The second step in development of The Dalles CFD model was to assemble bathymetric datasets and structural drawings sufficient to describe the dam (powerhouse, non-overflow dam, spillway, fish ladder entrances, etc.) and tailrace. These datasets are documented in this report as are various 3-D graphical representations of The Dalles spillway and tailrace. The performance of the CFD model was then validated for several cases as the third step. The validated model

  2. Synthesis of Juvenile Salmonid Passage Studies at The Dalles Dam, Volume II, 2001-05

    SciTech Connect (OSTI)

    Johnson, Gary E.; Beeman, John W.; Duran, Ian; Puls, Andrew

    2007-08-15

    The overall goal of juvenile salmonid research at The Dalles Dam is to provide data to inform decisions on strategies to improve smolt survival rates at the project. Survival improvement strategies address the three primary passage routes at The Dalles Dam -- spillway, sluiceway, and turbines – with the general intent to increase spill and sluice passage and decrease turbine passage. Since the review by Ploskey et al. (2001a) of research during 1982-2000 at The Dalles Dam, the Corps funded over $20M of research in at least 39 studies during 2001-2006. The purpose of the current review is to synthesize juvenile salmonid passage data at The Dalles Dam (TDA) collected from 2001 through 2006. The data we synthesize comes from numerous research techniques employed to address particular study objectives at The Dalles Dam. The suite of techniques includes acoustic and radio telemetry, acoustic cameras, acoustic Doppler current profilers, balloon tags, computational fluid dynamics models, drogues, fixed and mobile hydroacoustics, fyke nets, physical scale models, PIT-tags, sensor fish, sonar trackers, and underwater video. Hydraulic data involves flow patterns and water velocities. Biological data involve forebay approach paths and residence times, horizontal and diel distributions, passage efficiencies and effectiveness, fish behaviors, tailrace egress and predation rates, and route-specific and total project survival rates. Data for 2001-2006 are synthesized in this report to provide, in conjunction with Ploskey et al. (2001a), resources for engineers, biologists, and dam operators to use when making decisions about fish protection measures for juvenile salmonids at The Dalles Dam. This review covers the major fish passage research efforts during 2001-2006 and includes sections on the Environmental Setting, Forebay and Project Passage Studies, Spill Studies, Sluiceway Studies, Turbine Studies, Smolt Survival Studies, and a Discussion.

  3. Survival Estimates for the Passage of Yearling Chinook Salmon and Steelhead through Snake River Dams and Reservoirs, 1995 Annual Report.

    SciTech Connect (OSTI)

    Muir, William D.

    1996-03-01

    Documentation is provided for the third of a multiyear study to estimate the survival of juvenile salmonids passing through dams and reservoirs on the Snake River.

  4. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  5. Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Tackley, Sean C.

    2013-10-01

    This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurred in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.

  6. Fish Migration, Dams, and Loss of Ecosystem Services in the Mekong Basin

    SciTech Connect (OSTI)

    Dugan, Patrick J.; Barlow, Chris; Agostinho, Angelo A.; Baran, Eric; Cada, Glenn F; Chen, Daqing; Cowx, Ian G.; Ferguson, John W.; Jutagate, Tuantong; Mallen-Cooper, Martin; Marmulla, Gerd; Nestler, John; Petrere, Miquel; Winemiller, Kirk O.

    2010-06-01

    The past decade has seen increased international recognition of the importance of the services provided by natural ecosystems. It is unclear however whether such international awareness will lead to improved environmental management in many regions. We explore this issue by examining the specific case of fish migration and dams on the Mekong river. We determine that dams on the Mekong mainstem and major tributaries will have a major impact on the basin's fisheries and the people who depend upon them for food and income. We find no evidence that current moves towards dam construction will stop, and consider two scenarios for the future of the fisheries and other ecosystems of the basin. We conclude that major investment is required in innovative technology to reduce the loss of ecosystem services, and alternative livelihood strategies to cope with the losses that do occur

  7. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    SciTech Connect (OSTI)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  8. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    SciTech Connect (OSTI)

    Fischer, Steve; Wilson, Matthew

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  9. Evaluation of Ultrasonic Time-of-Flight Diffraction Data for Selected Control Rod Drive Nozzles from Davis Besse Nuclear Power Plant

    SciTech Connect (OSTI)

    Cumblidge, Stephen E.; Cinson, Anthony D.; Anderson, Michael T.

    2011-04-25

    Pacific Northwest National Laboratory (PNNL) examined ultrasonic (UT) time-of-flight diffraction (TOFD) data from ten (10) nozzles in the Davis Besse Nuclear Power Plant reactor closure head. The TOFD data was acquired by AREVA after a bare metal visual examination of the pressure vessel head indicated potential leakage in at least one nozzle. A detailed analysis of the UT data shows that Nozzle 4 has three indications consistent with cracking in the penetration tube. One of the indications starts at the wetted side of the weld and progresses to the annulus. In addition, examination of UT data from the annulus region of Nozzle 4 displays an irregular pattern that could be associated with boric acid deposits and leakage/wastage in the interference fit. The review of TOFD data for the other nine nozzles resulted in several indications being detected in the weld region and near the inner diameter (ID) and outer diameter (OD) surfaces of the penetration tube, but no other indications that are consistent with cracking that may have resulted in leakage were observed. A review of the back-wall reflections in the other nine nozzles also did not show strong indications of leakage, although Nozzle 67 displayed an irregularly-shaped region of high ultrasonic transmission near 180 degrees on the interference fit.

  10. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    SciTech Connect (OSTI)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

    2013-05-01

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  11. Survival and Passage of Yearling and Subyearling Chinook Salmon and Steelhead at The Dalles Dam, 2010

    SciTech Connect (OSTI)

    Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Fischer, Eric S.; Hughes, James S.; Khan, Fenton; Kim, Jin A.; Townsend, Richard L.

    2011-12-01

    The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.

  12. Eco-Design of River Fishways for Upstream Passage: Application for Hanfeng Dam, Pengxi River, China

    SciTech Connect (OSTI)

    Johnson, Gary E.; Rainey, William S.

    2012-05-20

    This paper provides a scientific approach to eco-design of river fishways to allow upstream movement of fish past new and existing dams in China. This eco-design approach integrates principles of fish ecology/behavior and engineering, a scientific field also known as bio-engineering or eco-hydraulics. We define a fishway as a structure or mechanism to convey fish upstream past a dam. Man-made or natural stream beds can be part of the fishway mechanism. Fish include bony and non-bony fishes, and upstream passage is the concern here, not downstream passage. The problem is dams block access to upstream habitat used for spawning, rearing, and refuge, i.e., dams decrease habitat connectivity. A solution to alleviate this problem is to design fishways, preferably while the dam is being designed, but if necessary, as retrofits afterward to provide a route that fish can and will use to pass safely upstream without undue delay. Our eco-design approach for fishways involves eight steps: 1) identify the primary species of importance; 2) understand basic ecology and behavior of these fish; 3) characterize the environmental conditions where passage is or will be blocked; 4 identify fishway alternatives and select a preferred alternative; 5) establish eco-design criteria for the fishway, either from management agencies or, if necessary, developed specifically for the given site; 6) where needed, identify and perform research required to resolve critical uncertainties and finalize the eco-design criteria; 7) apply the eco-design criteria and site-specific considerations to design the fishway, involving peer-review by local stakeholders in the process; 8) build the fishway, monitor its effectiveness, and apply the lessons learned. Example fishways are described showing a range of eco-designs depending on the dam site and fish species of concern. We apply the eco-design principles to recommend an approach and next steps for a fishway to pass fish upstream at Hanfeng Dam, an

  13. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  14. EIS-0526: Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers and the Bureau of Reclamation are jointly preparing an EIS that analyzes the potential environmental impacts of the proposed Lower Yellowstone Intake Diversion Dam Fish Passage Project. The proposed project is to improve passage for endangered pallid sturgeon and other native fish at the Intake Diversion Dam in the lower Yellowstone River while continuing the operation of the Lower Yellowstone Irrigation Project. DOE’s Western Area Power Administration is a cooperating agency in preparing the EIS because some alternatives include power interconnection, transmission, and/or delivery options. Additional information is available at http://www.usbr.gov/gp/mtao/loweryellowstone/.

  15. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    SciTech Connect (OSTI)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

    2013-06-21

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  16. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    SciTech Connect (OSTI)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  17. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    SciTech Connect (OSTI)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  18. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dales Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

    2012-02-01

    The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

  19. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  20. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-02-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  1. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  2. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-12

    The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

  3. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-06-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  4. Apparatus for efficient sidewall containment of molten metal with horizontal alternating magnetic fields utilizing a ferromagnetic dam

    DOE Patents [OSTI]

    Praeg, W.F.

    1997-02-11

    An apparatus is disclosed for casting sheets of metal from molten metal. The apparatus includes a containment structure having an open side, a horizontal alternating magnetic field generating structure and a ferromagnetic dam. The magnetic field and the ferromagnetic dam contain the molten metal from leaking out side portions of the open side of the containment structure. 25 figs.

  5. Apparatus for efficient sidewall containment of molten metal with horizontal alternating magnetic fields utilizing a ferromagnetic dam

    DOE Patents [OSTI]

    Praeg, Walter F.

    1997-01-01

    An apparatus for casting sheets of metal from molten metal. The apparatus includes a containment structure having an open side, a horizontal alternating magnetic field generating structure and a ferromagnetic dam. The magnetic field and the ferromagnetic dam contain the molten metal from leaking out side portions of the open side of the containment structure.

  6. Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dams Second Powerhouse, Columbia River

    SciTech Connect (OSTI)

    Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

    2008-01-01

    A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dams Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites Range D 122 m directly downstream from the existing sluice chute outfall and Range F 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

  7. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  8. Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

    2013-11-20

    Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

  9. Operation of Glen Canyon Dam. Final environmental impact statement, summary, comments and responses

    SciTech Connect (OSTI)

    1995-03-01

    The Federal action considered in this environmental impact statement (EIS) is the operation of Glen Canyon Dam, Colorado River Storage Project (CRSP), Arizona. The purpose of the reevaluation is to determine specific options that could be implemented to minimize--consistent with law-adverse impacts on the downstream environmental and cultural resources, as well as Native American interests in Glen and Grand Canyons.

  10. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C - SECTION 404(b)(1) Lower Yellowstone Intake Fish Passage EIS Draft Section 404(b)(1) Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Appendix C Section 404(b)(1) Analysis May 2016 i Contents 1 Introduction ..............................................................................................................................1 1.1 Background .......................................................................................................................1

  11. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Inpact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B - COST ENGINEERING Lower Yellowstone Intake Fish Passage EIS Lower Yellowstone Intake Diversion Dam Fish Project Draft Cost Engineering Appendix May 2016 ii Contents 1.0 Alternative Construction Cost Estimates ................................................................................ 1 1.1 General ........................................................................................................................ 1 1.2 Purpose

  12. Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region

    SciTech Connect (OSTI)

    Douglas G. Hall; Kristin L. Verdin; Randy D. Lee

    2012-03-01

    This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

  13. Updating of Safety Criteria for Basic Diagnostic Indicators of Dam at the Sayano-Shushenskaya HPP

    SciTech Connect (OSTI)

    Gordon, L. A.; Skvortsova, A. E.

    2013-09-15

    Values of diagnostic indicators [K]-limitations placed on radial displacements and turn angles of horizontal sections of the dam - which are permitted for each upper-pool level within the range from 520 to 539 m are determined and proposed for inclusion in the Declaration of Safety. Empirical relationships used to develop safety criteria K1 and K2 are modified.

  14. Deterioration of Pracana Dam due to ASR. Main features and repair works

    SciTech Connect (OSTI)

    Matos, D.S.; Camelo, S.; Silva, H.S.; Pinho, J.S.

    1995-12-31

    Some of the Portuguese concrete dams show evidences of ASR. In majority the phenomena is still benign. However, in a few cases some significant deterioration of ASR type have malfunctions arose. In such cases deteriorations of ASR type have been detected while in the others the ASSR type prevail, depending on the type of aggregate. The paper reports the most important case of ASR in Portuguese concrete dams. Pracana dam is a buttress structures built in 1948-51, being the aggregates predominantly of quartzitic and metapellitic nature. Subsequently to the intense fracturing due to a quick concrete cooling during the first filling of the reservoir, high levels of expansion rates had been detected by means of monitoring system. After 8 years emptied reservoir, rehabilitation works took place in 1991-92 aiming at the concrete mass regeneration and the installation of an upstream face membrane, the improvement of spillway capacity and of the foundation performances. The behaviour of the dam as well as the performed tests (petrographic, mechanic, ultrasonic and expansibility ones) and repair works are described in the paper.

  15. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  16. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    SciTech Connect (OSTI)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  17. Technical background information for the environmental and safety report, Volume 4: White Oak Lake and Dam

    SciTech Connect (OSTI)

    Oakes, T.W.; Kelly, B.A.; Ohnesorge, W.F.; Eldridge, J.S.; Bird, J.C.; Shank, K.E.; Tsakeres, F.S.

    1982-03-01

    This report has been prepared to provide background information on White Oak Lake for the Oak Ridge National Laboratory Environmental and Safety Report. The paper presents the history of White Oak Dam and Lake and describes the hydrological conditions of the White Oak Creek watershed. Past and present sediment and water data are included; pathway analyses are described in detail.

  18. Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two

  19. A giant dune-dammed lake on the North Platte River, Nebraska

    SciTech Connect (OSTI)

    Swinehart, J.B. (Univ. of Nebraska, Lincoln, NE (United States). Conservation and Survey Div.); Loope, D.B. (Univ. of Nebraska, Lincoln, NE (United States). Dept. of Geology)

    1992-01-01

    The recent work in the Nebraska Sand Hills, just north of the North Platte Valley, has revealed the presence of numerous dune dams--sites where eolian sand has filled Pleistocene paleovalleys and caused the formation of lake basins containing abundant small, interdunal lakes. Although the Platte River is considered the southern margin of the Sand Hills, there is a 1,200 sq km triangular area of large dunes in Lincoln County just south of the South Platte. The authors hypothesize that large dunes migrated southward to fill the North Platte Valley during glacial maximum when both the North and South Platte were dry. As Rocky Mountain snowmelt and Great Plains precipitation increased during deglaciation, a single 65 km-long, 15 km-wide, 50 m-deep lake formed behind the massive dune dam. The tentative chronology suggests that the lake was in existence for at least several thousand years. They have not yet found compelling evidence of catastrophic flooding downstream of the former lake. Evidence of two large Quaternary lakes on the White Nile between Khartoum and Malakal (Sudan) was discovered in the 1960's. Shoreline deposits indicate the lakes were 400--600 km long and up to 50 km wide. Although the lakes have been attributed to repeated blockage of the White Nile by clay-rich Blue Nile deposits, the distribution and age of dune sand near the confluence of these rivers suggest that, as in the Nebraska example, the course of the White Nile was blocked by dunes when the region was desiccated in the Late Pleistocene. Lakes behind permeable dams rise to a level where input equals output. Earthen dams are vulnerable to overtopping and piping. The relatively high permeability of dune sand prevents or delays overtopping, and piping is prevented by the extremely high low hydraulic gradients that typify extant sand dams.

  20. Dune-dammed lakes of the Nebraska Sand Hills: Geologic setting and paleoclimatic implications

    SciTech Connect (OSTI)

    Loope, D.B.; Swinehart, J.B. (Univ. of Nebraska, Lincoln, NE (United States))

    1992-01-01

    Within the western half of this grass-stabilized dunefield, about 1,000 interdune lakes are grouped into two clusters here named the Blue and Birdwood lake basins. In the lake basins, those parts of the valley not filled by dune sand are occupied by modern lakes and Holocene lake sediments. The Blue Creek dam is mounded transverse to flow; spill-over of the lake basin takes place over bedrock on the east side of the dam when lake level is 2 m higher than present. The permeability of dune sand prevents massive overflow, and thereby contributes to the integrity and longevity of the dam. Preserved lake sediments in the basin indicate that Blue Creek was obstructed prior to 13,000 yr BP, probably during glacial maximum (18,000 yr BP). Extensive peats dated at 1,500-1,000 yr BP lie directly on fluvial sand and gravel along the Calamus River, a stream that presently discharges a nearly constant 350 cfs. These sediments indicate blockage of streams also took place when linear dunes were active in the eastern Sand Hills in Late Holocene time. With the onset of an arid episode, dunes forming an interfluves curtail the severity of runoff events. As the regional water table drops, drainages go dry and dunes move uncontested into blocking positions. Although drainages of the eastern Sand Hills appear to have repeatedly broken through sand-blocked channels, the Blue and Birdwood lake basins are still blocked by Late Pleistocene dune dams. The repeated episodes of stream blockage and interbedded lake sediments and dune sands behind the extant dams record several strong fluctuations in Holocene climate. Recently proposed climatic models indicate that the northward flow of warm, moist air from the Gulf of Mexico is enhanced when the Gulf's surface temperature is low and the Bermuda high is intensified and in a western position. When the Bermuda high moves eastward, the core of the North American continent becomes desiccated.

  1. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    SciTech Connect (OSTI)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  2. Montana Tribes Realize Long-Held Vision of Acquiring Kerr Dam: Interview with Energy Keepers Inc. CEO Brian Lipscomb

    Office of Energy Efficiency and Renewable Energy (EERE)

    A short interview with Brian Lipscomb, president and CEO of Energy Keepers, Inc., a tribal corporation established in the fall of 2012 to manage the Confederated Salish and Kootenai Tribes’ (CSKT’s) planned acquisition of Kerr Dam.

  3. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010

    SciTech Connect (OSTI)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

  4. Seismic Analysis of a Rockfill Dam by FLAC Finite Difference Code

    SciTech Connect (OSTI)

    Miglio, Livia; Pagliaroli, Alessandro; Lanzo, Giuseppe; Miliziano, Salvatore

    2008-07-08

    The paper presents the results of numerical analyses carried out with FLAC finite difference code aiming at investigating the seismic response of rockfill dams. In particular the hysteretic damping model, recently incorporated within the code, coupled with a perfectly plastic yield criterion, was employed. As first step, 1D and 2D calibration analyses were performed and comparisons with the results supplied by well known linear equivalent and fully non linear codes were carried out. Then the seismic response of E1 Infiernillo rockfill dam was investigated during two weak and strong seismic events. Benefits and shortcomings of using the hysteretic damping model are discussed in the light of the results obtained from calibration studies and field-scale analyses.

  5. Riparian plant succession in the dam-regulated Colorado River: Why is saltcedar losing

    SciTech Connect (OSTI)

    Stevens, L. )

    1993-06-01

    Three modes of plant succession (inhibition, facilitation and tolerance) were tested to explain the replacement of exotic saltcedar (Tamarix ramosissima) by naive phreatophytes in the Colorado River corridor in the Grand Canyon. Dam construction reduced flood frequency and sediment transport, interrupting the [open quotes]perpetual succession[close quotes] of the pre-dam riparian vegetation and initially allowing saltcedar to proliferate. Inhibition results from direct or indirect competition, but field measurements and experiments demonstrate limited evidence of competitive superiority by naive species over saltcedar in three life stages. Field observations and experiments on germination, physiological responses to gradients and comparative life history analyses demonstrate that saltcedar is a stress tolerant, disturbance specialist in an ecologically stabilized river corridor where safe germination sites are increasingly rare. Altered flood frequency, increased soil coarseness and differential herbivory contribute to succession in this system.

  6. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Batten, G.; Cushing, Aaron W.; Kim, Jin A.; Johnson, Gary E.; Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.; Carpenter, Scott M.; Deng, Zhiqun; Etherington, D. J.; Fischer, Eric S.; Fu, Tao; Greiner, Michael J.; Hennen, Matthew J.; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Zimmerman, Shon A.

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  7. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    SciTech Connect (OSTI)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  8. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  9. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  10. Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

    SciTech Connect (OSTI)

    Hughes, James S.; Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Carpenter, Scott M.; Hennen, Matthew J.; Fischer, Eric S.; Batton, George; Carlson, Thomas J.; Cushing, Aaron W.; Deng, Zhiqun; Etherington, D. J.; Fu, Tao; Greiner, Michael J.; Ingraham, John M.; Kim, Jin A.; Li, Xi; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Seaburg, Adam; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Zimmerman, Shon A.

    2013-12-23

    The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.