Powered by Deep Web Technologies
Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

2

Organization Name Date Submitted File Name ACEEE Steve Nadel  

Broader source: Energy.gov (indexed) [DOE]

Submitted File Name ACEEE Steve Nadel 4/15/2011 ACEEE 4.15.2011 Alameda-Contra Coasta Transit District Chris Peeples 4/15/2011 Alameda-Contra Coasta Transit District 4.15.2011 American Academy of Arts and Sciences Robert W. Fri and Leslie C. Berlowitz 4/15/2011 American Academy of Arts and Science 4.15.2011 American Electric Power Michael L. Weinstein 4/15/2011 AEP 4.15.2011 American Gas Association, American Gas Foundation, American Public Gas Association, American Public Gas Association Research Foundation, Interstate Natural Gas Association of America, and the INGAA Foundation, Inc. Andrew K. Soto 4/15/2011 American Gas Association 4.15.2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Mark Ames 4/14/2011 American Society of Heating, Refrigerating and Air-Conditioning

3

Date submitted to IS: REQUEST FOR CERTIFICATION OF ATTENDANCE FOR NON-  

E-Print Network [OSTI]

Information About You: LAST NAME: _________________ First Name: __________ Date: ______ Solar I.D. #: _____________________ Date of Birth: ___________ Semester First Entered Stony Brook: ________ Passport No

4

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

5

Dates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

6

DATE:  

Broader source: Energy.gov (indexed) [DOE]

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

7

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

8

DATE:  

Broader source: Energy.gov (indexed) [DOE]

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

9

DATE  

Broader source: Energy.gov (indexed) [DOE]

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

10

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

11

DATE:  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

12

Date  

Broader source: Energy.gov (indexed) [DOE]

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

13

DATE  

Broader source: Energy.gov (indexed) [DOE]

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

14

DATE:  

Broader source: Energy.gov (indexed) [DOE]

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

15

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

16

DATE:  

Broader source: Energy.gov (indexed) [DOE]

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

17

DATE:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

18

DATE:  

Broader source: Energy.gov (indexed) [DOE]

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

19

DATE:  

Broader source: Energy.gov (indexed) [DOE]

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

20

DATE:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE:  

Broader source: Energy.gov (indexed) [DOE]

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

22

DATE:  

Broader source: Energy.gov (indexed) [DOE]

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

23

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

24

Predicting recreation priorities  

E-Print Network [OSTI]

: Recreation, Park, and Tourism Sciences PREDICTING RECREATION PRIORITIES A Thesis by KINDAL ALAYNE HUNT Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... Approved as to style and content by: David Scott (C ' ofCo it e) er itt er) John Cromp (Membe Ro tton (Member) os 0' (Head f D ent) May 2003 Major Subject: Recreation, Park, and Tourism Sciences ABSTRACT Predicting Recreation Priorifies. (May...

Hunt, Kindal Alayne

2012-06-07T23:59:59.000Z

25

Date Event  

Broader source: Energy.gov (indexed) [DOE]

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

26

Energy Efficiency: A Priority  

E-Print Network [OSTI]

Energy Efficiency: A Priority October 9th 2013 2 Energy efficiency: a priority NBC profile (April 30th, 2013) 1st financial institution in Quebec 19 920 employees 451 branches in Canada 2,4 million individual clients 3 Energy efficiency: a... priority Energenia?s profile Consulting firm specializing exclusively in energy efficency Founded by Robert Patenaude in 2003 National Bank?s main partner for the development, implementation and supervision of the energy efficiciency program since...

Patenaude, R.

2013-01-01T23:59:59.000Z

27

Submitting Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Jobs Submitting Jobs Submitting Jobs Submitting your job If you are submitting your job on Genepool or Phoebe you do NOT need to source any batch settings. The batch environment has been loaded into your path by default. If qsub is not working properly, check to make sure that the uge module is loaded: module load uge If you are submitting a job from an external submit host you need to source the appropriate settings.sh file for Genepool or Phoebe. source /opt/uge/genepool/uge/genepool/common/settings.sh qsub commands and options UGE (Univa Grid Engine) is the batch system used for Genepool/Phoebe. Action How to do it Comment Submit a job qsub script In UGE you need to submit a script, not an executable. Specify number of processors for a threaded job qsub -pe pe_slots 8 ... Request 8 cores on a single node for your job. Please specify as many processors as will be needed during your job.

28

Property:CSC-Priority | Open Energy Information  

Open Energy Info (EERE)

CSC-Priority Property Type String Description Geothermal Case Study Challenge (CSC) area completion priority Allows Values Priority Area;Completed Area;Low Priority Area Pages...

29

1992 Acceptance Priority Ranking. Revision 1  

SciTech Connect (OSTI)

In accordance with the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), an annual Acceptance Priority Ranking (APR) report is issued by the Department of Energy (DOE). The APR establishes the order in which DOE allocates the projected spent nuclear fuel (SNF) acceptance capacity of the Civilian Radioactive Waste Management System (CRWMS). As required by the Standard Contract, the priority ranking is based on the date the SNF was permanently discharged, with the owners of the oldest SNF, on an industry-wide basis, given the highest priority. The phrase ``date the SNF was permanently discharged`` means the date the reactor went subcritical for the purpose of permanently discharging the SNF, as reported to DOE by the Purchasers on the Nuclear Fuel Data Form, RW-859. When a complete date was not provided, the date was determined either from the Nuclear Regulatory Commission`s Average Daily Unit Power Level data, or from Purchaser`s comments received on the previous APR. The 1992 APR is based on SNF discharges as of December 31, 1991.

Not Available

1993-05-01T23:59:59.000Z

30

Software Services: Priorities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Priorities Priorities Priorities are how we stay focused on the things that are most important. They help position the SSG and the APS to achieve its goals. We take choosing our priorities seriously. The projects the SSG works on and the amount of time and resources dedicated to those projects are determined based on a number of factors and from input from a variety of sources. Software Advisory Group The Software Advisory Group serves as an advisory group to the SSG. Its membership consists of XSD staff concerned with the state of software at the APS. It's a venue to discuss current projects and future directions, and to foster communication between the SSG and the XSD staff. The Software Advisory Group also provides input on new project ideas and proposals. Issues, concerns and suggestions from the Software Advisory Group and

31

Investigation of the potential of fly ash as an adsorbent for removal of priority pollutants  

E-Print Network [OSTI]

INVESTIGATION OF THE POTENTIAL OF FLY ASH AS AN ADSORBENT FOR REMOVAL OF PRIORITY POLLUTANTS A Thesis by MINOO ZARDKOOHI Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE December 1993 Major Subject: Chemical Engineering INVESTIGATION OF THE POTENTIAL OF FLY ASH AS AN ADSORBENT FOR REMOVAL OF PRIORITY POLLUTANTS A Thesis by MINOO ZARDKOOHI Submitted to Texas A&M University in partial...

Zardkoohi, Minoo

2012-06-07T23:59:59.000Z

32

Global Biodiversity Conservation Priorities  

E-Print Network [OSTI]

Global Biodiversity Conservation Priorities T. M. Brooks,1,2,3 * R. A. Mittermeier,1 G. A. B. da is essential to minimize biodiversity loss. To address this need, biodiversity conservation organizations have conservation funding. H uman actions are causing a biodiversity crisis, with species extinction rates up

Wilmers, Chris

33

COMPLAINT FORM Submit To: Today's Date  

E-Print Network [OSTI]

Phone City / State / Zip _________ Cell Phone II. TYPE & BASIS OF COMPLAINT (Check the boxes that apply.) Complainant (Name & Title) ______ Department UFID # Address (University) Work Phone Address (Residence) Home #1 (Name & Title) ______ Address (Work) Work Phone Address (Home) Home Phone Mobile Phone Respondent

Pilyugin, Sergei S.

34

Distribution System Research Priorities  

Broader source: Energy.gov (indexed) [DOE]

Mark McGranaghan Mark McGranaghan EPRI ELECTRICITY DISTRIBUTION SYSTEM WORKSHOP Crystal City, VA September 24, 2012 Distribution System Research Priorities 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. The Power System Roadmaps start with a Vision Future Power System will require new technologies, infrastructure, and control systems 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. R&D Roadmaps - Coordination is Critical Roadmaps are living documents 4 © 2012 Electric Power Research Institute, Inc. All rights reserved. Developing the next generation grid * Industry needs new technologies, communication protocols, and information management methods - More variable generation sources and controllable loads - Aging infrastructure

35

1998 Priority Setting | Department of Energy  

Energy Savers [EERE]

Setting 1998 Priority Setting Draft of the 1998 Priority Setting for Standards and Test Procedure Rulemakings, June 27, 1997 prioritysettingfy98.pdf More Documents &...

36

Energy Priorities | Open Energy Information  

Open Energy Info (EERE)

Priorities Priorities Jump to: navigation, search Name Energy Priorities Place Seattle, Washington Zip 98011 Product Energy Priorities is an online news blog on the clean energy space operated by editor Denis Du Bois. Coordinates 47.60356°, -122.329439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.60356,"lon":-122.329439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

37

A 10-year content analysis to assess research theme areas in agricultural education: gap analysis of future research priorities in the discipline.  

E-Print Network [OSTI]

A 10?YEAR CONTENT ANALYSIS TO ASSESS RESEARCH THEME AREAS IN AGRICULTURAL EDUCATION: GAP ANALYSIS OF FUTURE RESEARCH PRIORITIES IN THE DISCIPLINE A Dissertation by LESLIE DAWN JENKINS EDGAR Submitted to the Office of Graduate... IN AGRICULTURAL EDUCATION: GAP ANALYSIS OF FUTURE RESEARCH PRIORITIES IN THE DISCIPLINE A Dissertation by LESLIE DAWN JENKINS EDGAR Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

Edgar, Leslie Dawn

2009-05-15T23:59:59.000Z

38

12University Research Priority Programs  

E-Print Network [OSTI]

12University Research Priority Programs Asia and Europe Dynamics of Healthy Aging Ethics Evolution Cancer Research Solar Light to Chemical Energy Conversion #12;Contact Dr. Cornelia Schauz Research and Academic Career Development Künstlergasse 15 CH-8001 Zurich Phone: 044 634 48 55 cornelia

Zürich, Universität

39

MONGOLIA'S INVESTMENT PRIORITIES FROM A NATIONAL DEVELOPMENT  

E-Print Network [OSTI]

1 MONGOLIA'S INVESTMENT PRIORITIES FROM A NATIONAL DEVELOPMENT PERSPECTIVE SHAGDAR ENKHBAYAR, DAVID Quality Considerations 15 J. Inclusive and stable economic growth 15 3 PRIORITY INVESTMENT SCENARIOS development projects and investment partnerships, the Government of Mongolia plans to leverage its abundant

Kammen, Daniel M.

40

Priority Setting in Public Health  

Science Journals Connector (OSTI)

Abstract The key drivers of population health lie outside the health sector. However, decision makers outside the health sector are primarily interested in delivering sector specific outputs other than health. Economic approaches to priority setting can help align sectors to consider the intersectoral impacts of decisions within an integrated societal framework. First, economic evaluation can explicitly identify and measure all impacts including health and value them as inputs into overall social welfare. Second, priority setting tools such as program budgeting marginal analysis and multi-criteria decision analysis can then be used to help translate evidence into policy, where the full consequences of decisions are considered and the overall aim is to improve social welfare.

K. Lawson; H. Mason; E. McIntosh; C. Donaldson

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

INSTRUCTIONS FOR SUBMITTING NUCLEAR  

E-Print Network [OSTI]

waste management proceedings. Keywords Nuclear, nuclear power plant, spent fuel, nuclear waste, dataCALIFORNIA ENERGY COMMISSION INSTRUCTIONS FOR SUBMITTING NUCLEAR POWER PLANT-RELATED DATA of Submitted Data 3 NUCLEAR POWER PLANT DATA REQUESTS 6 A. Environmental Impacts 6 B. Spent Fuel Generation 8 C

42

Submitting PDSF Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting PDSF Jobs Submitting PDSF Jobs Submitting PDSF Jobs Univa Grid Engine (UGE) is the batch system used at PDSF. This is a fork of the Sun Grid Engine (SGE). PDSF batch jobs have a 1 day wallclock limit. If your job attempts to run beyond the wallclock limit UGE will kill it. The total number of jobs (running, pending or otherwise) for all users is limited to 30,000 and the number of jobs a single user can have at any one time is limited to 5000. Since PDSF is a shared facility any jobs that are detrimental to the overall performance of the batch system are subject to being deleted at the discretion of the PDSF staff. If this happens, you will be notified and asked to adjust your workflow as necessary. If you are planning to submit thousands of short jobs concurrently consider

43

Submitted to Topology Proceedings  

E-Print Network [OSTI]

Submitted to Topology Proceedings TUKEY CLASSES OF ULTRAFILTERS ON DAVID MILOVICH Abstract, nor U, is Tukey equivalent to [c]() = p = c. We also prove two negative ZFC results about the possible Tukey classes of ultrafilters

Milovich, David

44

Microsoft Word - AHEdoeprogressreportfinalreview093009submitted  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Use Use of Air2Air TM Technology to Recover Fresh-Water from the Normal Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants Final Report Project Dates: 7/31/06 - 9/30/09 September 30, 2009 For DOE Funding Opportunity - Advanced Technologies and Concepts to Minimize Freshwater Use in Coal-Based Thermoelectric Power Plants Funding Opportunity Number: DE-PS26-05NT42411 Instrument Number: DEFC2605NT42725 CFDA Number: 81.089 Fossil Energy Research and Development Submitting Organiazation: SPX Cooling Technologies 7401 West 129 th Street Overland Park, KS 66213 Principal Author/Investigator: Ken Mortensen Phone: 913-664-7723 Fax: 913-664-7871 E-mail: ken.mortensen@spx.com II DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof,

45

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

46

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

47

U.N. Secretary General tells NREL Clean Energy a Top Priority | OpenEI  

Open Energy Info (EERE)

U.N. Secretary General tells NREL Clean Energy a Top Priority U.N. Secretary General tells NREL Clean Energy a Top Priority Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(1992) Super contributor 31 August, 2011 - 14:01 imported OpenEI National Renewable Energy Laboratory (Golden, ... In a recent visit to the National Renewable Energy Laboratory in Golden, Colorado, the United Nations Secretary General Ban Ki-Moon affirmed that the growing clean energy to reach billions of people across the globe is the top priority. Secretary General Ban Ki-Moon told researchers at NREL's Research Support Facility that NREL is playing a crucial role, through numerous U.N. partnerships, in making the world more sustainable. Ban believes that there is still much more growth needed to create a clean energy economy that will

48

ARM - Submitting Proposals : Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

49

Submitting Organization Sandia National ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

systems. To date, large investments in contaminant-specific sensors utilizing micro and nano technologies have not yet demonstrated the engineering reliability...

50

Date Submitted: December 2010 Reason for Submission: (Check One)  

E-Print Network [OSTI]

New Position, Initial Evaluation on POSITION DESCRIPTION Position Title: Supervisor, Event Operations Leave Contract POSITION SUMMARY Reporting to the Manager, Event Operations, and working in conjunction with the Supervisors, Event Operations is a hands on supervisory position for the Conference and Events department

Garousi, Vahid

51

Date Submitted: January 2013 Reason for Submission: (Check One)  

E-Print Network [OSTI]

to ensure an efficient, high quality and profitable food service. The Executive Chef directs and motivates) The Executive Chef is a collaborate member of the Food, Beverage and Events senior management team responsible for the development of long-term strategy and tactics related to the overall Food, Beverage and Events area's business

Habib, Ayman

52

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

53

DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

54

DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

55

Utility Priority Number Evaluation for FMEA  

Science Journals Connector (OSTI)

Traditionally, decisions on how to improve an operation are based on risk priority number (RPN) in the failure mode and effects analysis (FMEA). Many scholars questioned the RPN method ... make a decision on impr...

Jih Kuang Chen

2007-10-01T23:59:59.000Z

56

Submitting Batch Jobs on Franklin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From...

57

FINAL Submitted to NREL  

Broader source: Energy.gov (indexed) [DOE]

Submitted to NREL Submitted to NREL 10-21-11 City of Naperville Case Study 1 An example of an automated switch used in Naperville's distribution automation systems. At the Forefront of the Smart Grid: Empowering Consumers in Naperville, Illinois Naperville, Illinois, is a suburban community located outside of Chicago. Typical in many ways, Naperville is the fifth largest city in Illnois and an active, engaged citizenry that is environmentally conscious and technically savvy. In fact, the National Renewable Energy Laboratory's recent assessment of leading utility green power programs ranks Naperville as No. 5 in the nation in percentage of customer participation. 1 Additionally, about one-quarter of Naperville's electricity customers pay their

58

Peer Review Plan Date: 1/31/2012  

E-Print Network [OSTI]

Peer Review Plan Date: 1/31/2012 Source Center: U.S. Geological Survey (USGS) Pacific Island://manoa.hawaii.edu/hpicesu/techr/177/default.htm) and is now being submitted to an outside peer-reviewed journal for publication. The manuscript will now be submitted to a journal, the suggestions of peer reviewers selected by the journal

Torgersen, Christian

59

Photo Contest Closing date 2013 9 19  

E-Print Network [OSTI]

2013 About Photo Contest Closing date 2013 9 19 Photo Contest Eligibility International) (8MB ) By E-Mail (Maximum size 8MB per photo, up to 2 photos) kisc-koryu@edu.kobe-u.ac.jp 2) CD-R () By Post or submit by hand to KISC Photos (up to 2 photos) burned on a CD-R. Note that your data

Banbara, Mutsunori

60

Alternative Fuels Data Center: Vehicle Acquisition Priorities and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Acquisition Vehicle Acquisition Priorities and Alternative Fuel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Acquisition Priorities and Alternative Fuel Use Requirement on

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

POLICY CHECKLIST To be submitted with the policy as presented at Cabinet  

E-Print Network [OSTI]

POLICY CHECKLIST To be submitted with the policy as presented at Cabinet Initiating party: ______________________________________ Date: _______________ (person who initiated the policy change, project leader) Originating Department/Office: ________________________________________________ Policy name: ______________________________________________________________ New Policy: _____ Amended

Khan, Javed I.

62

Input to the FESAC Priorities Panel: RF Heating Technology Submitted by  

E-Print Network [OSTI]

plan for development of Fusion Energy. A strong program of Electron Cyclotron Heating Technology in plasma physics research. What is ECH Technology? Electron Cyclotron Heating (ECH) and Electron Cyclotron Current Drive (ECCD) are used for plasma heating and current drive at the electron cyclotron resonance

63

Upgrading Below-Grade Spaces: Assessing Priorities  

Broader source: Energy.gov (indexed) [DOE]

Below-Grade Spaces: Below-Grade Spaces: Assessing Priorities Sam Breidenbach [Cold climate bias] Gap-Balancing risk and homeowner expectations * Managing risk and challenges for contractors - Moisture, mold and liability - Durability/Sustainability - Design/build vs. owner's architect - Contract language to reduce liability - Aligning technical details with specific situations - Below grade spaces are business opportunities - Selling and Competition Gap-Balancing risk and homeowner expectations * Homeowner Expectations and Priorities - Focused on "house beautiful" until technical failure occurs - Health related issues - Opportunity to conserve energy - Cost vs. value-"inexpensive additional space" - Expectations not aligned with physical realities.

64

ACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised)  

E-Print Network [OSTI]

with the President, Director & Associate Director. Review current communications plan for Executive and BoardACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised) GOAL Foster pride and participation informed MAA Board Investigate an increase in number of Executive Committee meetings with standard agenda

Thompson, Michael

65

Input to Priorities Panel August 7, 2012  

E-Print Network [OSTI]

Input to Priorities Panel August 7, 2012 Jeff Freidberg MIT 1 #12;The Emperor of Fusion has · Comparison (1 GW overnight cost) · Coal $ 3B · Gas $ 1B · Nuclear $ 4B · Wind $ 2B · Solar-T $ 3B · ITER $25B

66

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

67

Monticello National Priorities List (NPL) Sites  

Office of Legacy Management (LM)

National Priorities List (NPL) Sites National Priorities List (NPL) Sites Federal Facilities Agreement (FFA) Quarterly Report: January 1 -March 31, 2009 Department of Energy Legacy Management (DOE LM) Site Manager: Jalena Dayvault This repott summarizes current project status and activities implemented during January through March 2009, and prqvides a schedule of planned near term activities for the Monticello Mill Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This repmt also includes disposal cell and Pond 4 leachate collection data, quarterly site inspection reports, site meteorological data, and performance summary for the ex situ ground water treatment system. 1.0 MMTS Activities/Status Disposal Cell and Pond 4 . . * Monthly and quarterly inspection of the repository identified no abnormalities (see

68

Priorities for In-situ Aerosol Measurements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Priorities for In-situ Priorities for In-situ Aerosol Measurements Parameters * Aerosol light absorption coefficient - spectral, including UV, vis, and IR - as f(RH), and at ambient RH * Phase function - or relevant integral properties (how many?) * Ice nuclei * Scattering vs. RH, for RH>90% * CCN, as f(S, D p ) * Size distribution * Chemical composition - for determining climate forcing, vs. radiative effect Calibration * Number concentration * Size and shape * Light absorption reference method Characterization * Accuracy and precision - need well-understood error bars * Algorithm comparisons * Closure studies * Facilities for method testing - aircraft time Methods * Inlets - shattering/splashing - location on airplane - passing efficiency - inletless analyzers/samplers * Packaging - modular/portable "pods" for multiple a/c

69

Research priorities for mobile air toxics  

SciTech Connect (OSTI)

The Health Effects Institute, a cooperative effort of the auto industry and the EPA, whose mission is to provide health effects information to ensure that motor vehicle emissions do not pose unreasonable risks, recently undertook a project to define priorities for research that would decrease uncertainties in risk assessments for mobile air toxics. At a workshop held in December 1992, scientists from academia, industry, and government worked to identify uncertainties in understanding the potential risk of exposure to mobile air toxics, including methanol, an important potential alternate fuel. Although cancer risk was the primary concern regarding most compounds, there was also much discussion of non-cancer effects of potential importance. Participants discussed research priorities for scientific issues that apply across all compound groups, such as dosimetry, high-to-low dose extrapolation, exposure assessment, and molecular biology approaches.

Not Available

1993-04-22T23:59:59.000Z

70

Mobility Investment Priorities Project State Funding Initiatives Summary  

E-Print Network [OSTI]

Mobility Investment Priorities Project State Funding Initiatives Summary 2008-2012 1957 2011 #12;#12;Establishing Mobility Investment Priorities Under TxDOT Rider 42: State Transportation Funding Initiatives&M Transportation Institute The Texas A&M University System College Station, Texas Mobility Investment Priorities

71

Michigan Apple Committee Research Priorities for 2014/15  

E-Print Network [OSTI]

Michigan Apple Committee Research Priorities for 2014/15 Following are the 2014/15 priorities of the Michigan Apple Committee. (In priority order.) 1. Increase demand To conduct consumer related research that will help sell Michigan Apples more profitably. a. Market research b. Value ­ convenience, apples versus

Douches, David S.

72

Submitting Batch Jobs on Carver  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Overview A batch job is the most common way users run production applications on NERSC machines. Carver's batch system is based on the PBS model, implemented with the Moab scheduler and Torque resource manager. Typically, the user submits a batch script to the batch system. This script specifies, at the very least, how many nodes and cores the job will use, how long the job will run, and the name of the application to run. The job will advance in the queue until it has reached the top. At this point, Torque will allocate the requested number of nodes to the batch job. The batch script itself will execute on the "head node" (sometimes known as the "MOM" node). See Queues and Policies for details of batch queues, limits,

73

lead-isotope dating  

Science Journals Connector (OSTI)

lead-isotope dating, lead-lead dating, lead-isotope age measurement, lead-lead age measurement ? Blei-Isotopen(-Alters)bestimmung, f, Blei-Isotopen-Datierung

2014-08-01T23:59:59.000Z

74

Request Log Closedl Date Yes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

75

Governor Brown's Research Priorities in the areas of Clean Energy and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Governor Brown's Research Priorities in the areas of Clean Energy and Governor Brown's Research Priorities in the areas of Clean Energy and Energy Efficiency Speaker(s): Clifford Rechtschaffen Edward Randolph Heather Sanders Laurie ten Hope Date: October 26, 2012 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Jodi Bellacicco Karen Salvini The Brown Administration has been pursuing numerous clean energy policies. These include developing 20,000 megawatts of renewable energy, including 12,000 megawatts of distributed renewable generation by 2020, aggressive building and appliance efficiency standards, including aggressive targets for zero net energy homes and businesses, new financing tools to incentivize widespread energy retrofits of existing buildings, development of energy storage to meet peak load demand and to provide

76

Funding Board Application Please submit your application, resume, and a cover letter to an ASMSU Administrative Assistant in  

E-Print Network [OSTI]

Funding Board Application 2014-2015 Please submit your application, resume, and a cover letter will not be reviewed without a resume and a cover letter. (Please Print) Date:____________________________ Name

Maxwell, Bruce D.

77

Submitting Batch Jobs on Franklin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From 5am-6pm Pacific Time, 256 nodes are reserved for debugging and interactive use. See also, running Interactive Jobs. Sample Batch Scripts The following batch script requests 8 cores on 2 nodes with a 10 minute wall clock limit in the debug queue. Torque directive lines tell the batch system how to run a job and begin with #PBS. #PBS -q debug #PBS -l mppwidth=8 #PBS -l walltime=00:10:00 #PBS -j eo #PBS -V cd $PBS_O_WORKDIR aprun -n 8 ./a.out Here is another example requesting 8 processors using 4 nodes with only 2 cores per node: #PBS -q debug #PBS -l mppwidth=8 #PBS -l mppnppn=2 #PBS -l walltime=00:10:00

78

Date created: Date amended: February 2009  

E-Print Network [OSTI]

or on any relevant individual issue � Determining what types of risk are acceptable and which appetite is usually defined as "the amount of risk that an organisation is prepared to accept, tolerateDate created: Date amended: February 2009 - 1 � Risk Management Policy.doc RISK MANAGEMENT POLICY 1

Subramanian, Sriram

79

Recommendation 214: Placing more emphasis and priority on evaluating...  

Office of Environmental Management (EM)

(DOE) place more emphasis and priority on evaluating technologies that could make recycling excess materials cost effective. Decontaminating these materials for resale can have...

80

Hanford Advisory Board 2013 Program of Work/Priorities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hanford Advisory Board 2013 Program of WorkPriorities 9712 Page 1 of 15 Topic Relevant Document or Decision Policy Level Issue Action 1 Committee Assignment Timing Comments...

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed  

Broader source: Energy.gov (indexed) [DOE]

Appliance Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products ................................................................ 1-2 1.2.1 Consumer Products .................................................................................... 1-3 1.2.2 Commercial Products................................................................................. 1-5 1.2.2.1 Products Regulated under EPCA Provisions Concerning Consumer

82

ORISE: Safety is our top priority  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safety Safety Integrated Safety Management Voluntary Protection Program VPP Star Status Environment Work Smart Standards Oak Ridge Institute for Science Education Safety at ORISE At the Oak Ridge Institute for Science and Education (ORISE) safety is our number one priority. We not only have a tradition of safety at work, but strongly encourage our employees to carry this mindset beyond the workplace and into their homes and communities. Employees are trained in how to work safely and are required to sign a safety pledge that affirms their commitment to safety. The pledge also obligates them to watch out for each another, challenge and report unsafe working conditions, follow all safety policies and procedures, and never take shortcuts at the expense of safety. For ORISE employees, the word "safety" includes the environment, as

83

CSR Press Release Submitted by  

E-Print Network [OSTI]

CSR Press Release Submitted by: Categories: Posted: Energy Efficiency Listed as the Top important to their work. Across all five sectors included in the survey, energy efficiency was listed as by far the most important sustainability issue at hand, with water and land & soil falling to the bottom

84

Submitted to *Xidian University, China  

E-Print Network [OSTI]

THESIS Submitted to *Xidian University, China *Institut National des Sciences Appliquées de Rouen, France To obtain China-France Joint PhD in Discipline: PHYSICS Speciality: Energy by WANG Jiajie Shaped.09.2011 Members of the jury: Reviewers: Bai Jintao Professor, Northwest University, Xi'an, China Liu Weidong

Boyer, Edmond

85

CSR Press Release Submitted by  

E-Print Network [OSTI]

in 2000, yet fuel consumption decreased by 3.2 million gallons. Fuel efficiency levels were improved, sophisticated routing technology and operational initiatives such as minimizing engine idling. Alternative fuelCSR Press Release Submitted by: Categories: Posted: UPS Sets New Automotive Goal to Improve Fuel

86

Seismic viscoelastic attenuation Submitted to  

E-Print Network [OSTI]

Seismic viscoelastic attenuation Submitted to: Encyclopedia of Solid Earth Geophysics Harsh Gupta-3046 USA E-mail: vernon.cormier@uconn.edu Tel: 860-486-3547 Fax: 860-486-3346 #12;SEISMIC VISCOELASTIC ATTENUATION Synonyms Seismic intrinsic attenuation Definitions Linear viscoelastic attenuation. The loss

Cormier, Vernon F.

87

Research priorities for occupational radiation protection  

SciTech Connect (OSTI)

The Subpanel on Occupational Radiation Protection Research concludes that the most urgently needed research is that leading to the resolution of the potential effects of low-level ionizing radiation. This is the primary driving force in setting appropriate radiation protection standards and in directing the emphasis of radiation protection efforts. Much has already been done in collecting data that represents a compendium of knowledge that should be fully reviewed and understood. It is imperative that health physics researchers more effectively use that data and apply the findings to enhance understanding of the potential health effects of low-level ionizing radiation and improve the risk estimates upon which current occupational radiation protection procedures and requirements depend. Research must be focused to best serve needs in the immediate years ahead. Only then will we get the most out of what is accomplished. Beyond the above fundamental need, a number of applied research areas also have been identified as national priority issues. If effective governmental focus is achieved on several of the most important national priority issues, important occupational radiation protection research will be enhanced, more effectively coordinated, and more quickly applied to the work environment. Response in the near term will be enhanced and costs will be reduced by: developing microprocessor-aided {open_quotes}smart{close_quotes} instruments to simplify the use and processing of radiation data; developing more sensitive, energy-independent, and tissue-equivalent dosimeters to more accurately quantify personnel dose; and developing an improved risk assessment technology base. This can lead to savings of millions of dollars in current efforts needed to ensure personnel safety and to meet new, more stringent occupational guidelines.

Not Available

1994-02-01T23:59:59.000Z

88

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 2, 2010 CX-000738: Categorical Exclusion Determination Site Characterization of the Highest-Priority Geologic Formations for Carbon Dioxide storage in Wyoming CX(s) Applied: B3.1, B3.7, B3.8 Date: 01/22/2010 Location(s): Sweetwater County, Wyoming Office(s): Fossil Energy, National Energy Technology Laboratory January 22, 2010 CX-000739: Categorical Exclusion Determination Site Characterization of the Highest-Priority Geologic Formations for Carbon Dioxide storage in Wyoming CX(s) Applied: A1, A9, B3.6 Date: 01/22/2010 Location(s): Laramie, Wyoming Office(s): Fossil Energy, National Energy Technology Laboratory January 22, 2010 CX-000740: Categorical Exclusion Determination Site Characterization for Carbon Dioxide Storage from Coal-fired Power Facilities in the Black Warrior Basin of Alabama

89

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 2, 2010 CX-000737: Categorical Exclusion Determination Catalytic Transformation of Waste Carbon Dioxide into Valuable Products CX(s) Applied: A9, B3.6 Date: 01/22/2010 Location(s): Ithaca, New York Office(s): Fossil Energy, National Energy Technology Laboratory January 22, 2010 CX-000738: Categorical Exclusion Determination Site Characterization of the Highest-Priority Geologic Formations for Carbon Dioxide storage in Wyoming CX(s) Applied: B3.1, B3.7, B3.8 Date: 01/22/2010 Location(s): Sweetwater County, Wyoming Office(s): Fossil Energy, National Energy Technology Laboratory January 22, 2010 CX-000739: Categorical Exclusion Determination Site Characterization of the Highest-Priority Geologic Formations for Carbon Dioxide storage in Wyoming CX(s) Applied: A1, A9, B3.6

90

Managing multi-priority services in ubiquitous computing applications  

Science Journals Connector (OSTI)

Applications in ubiquitous computing environments are expected to have different priorities, memory and real-time requirements. Given a home gateway with a set of running services, we need to terminate some of the existing services to allow a more ... Keywords: home networks, internet appliances, memory management, multi-priority services, service management, service replacement, simulation, smart homes, smart spaces, ubiquitous computing

Ibrahim Kamel; Mohamed Saad; Sanaa A. Muhaureq

2010-09-01T23:59:59.000Z

91

Priorities for Rebuilding Civilian Iraqi Science  

Science Journals Connector (OSTI)

...culture to save date palms Aquaculture Internet and data networks The initiative comes...12 March, p. 1594 ). But the prison abuse scandal has complicated this effort. It may be...since the first Gulf War in 1991. Most young scientists in Iraq have never spent time...

Richard Stone

2004-05-14T23:59:59.000Z

92

Microsoft PowerPoint - NEAC Top Priorities.pptx  

Broader source: Energy.gov (indexed) [DOE]

Goals & Priorities for 2012 Goals & Priorities for 2012 Shane Johnson Principal Deputy Assistant Secretary Office of Nuclear Energy U.S. Department of Energy Nuclear Energy Advisory Committee Washington, DC December 13, 2011 2 Goals & Priorities for 2012 1) Small Modular Reactor Deployment 2) Modeling and Simulation Hub 3) Blue Ribbon Commission Report Recommendations 4) Advanced Test Reactor (ATR) Upgrades 5) Remote Handled Low Level Waste Disposal Project at INL 3 Goals & Priorities for 2012 6) Accident Tolerant LWR Fuel Research and Development 7) Light Water Reactor Sustainability R&D 8) Extraction of Uranium from Seawater 9) Decision on INL Contract Option 10) Advance international stakeholder support for the Comprehensive Fuel Services (CFS) concept 4 Goals & Priorities for 2012

93

PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL ...  

E-Print Network [OSTI]

Apr 16, 2010 ... PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL GRADES. Please view rather than print this information. A version without...

saerens

2010-04-16T23:59:59.000Z

94

Fermilab Legal Office - Ethics Program - Submit a Question  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submit a Question Ask the Ethicist Ask the Ethicist Questions & Answers Submit a Question Annual Reminders Reporting Fraud Holiday Parties Complete the form below to submit a...

95

Biofuel vs Bioinvasion: Seeding Policy Priorities  

Science Journals Connector (OSTI)

Biofuel vs Bioinvasion: Seeding Policy Priorities ... This rapid increase in cellulosic energy production has seeded a policy dilemma: while biofuels offer great promise and will be subsidized and supported by the federal government (EISA, 2008 Farm Bill), the development and promotion of potentially invasive plants as biofuels could place federal agencies in direct conflict with 1999 U.S. Executive Order (EO) 13112 (5, 6), and other laws and policy directives. ... Depending on their mission, federal agencies might engage in biofuel programs in a number of ways, such as (1) conducting biofuel research and development; (2) introducing and producing biofuel crops for experimentation and/or use; (3) subsidizing biofuel research, development, production, and marketing; (4) purchasing biofuels to supplement their energy demands; (5) establishing early detection and rapid response programs for escaped biofuel plants; (6) implementing long-term management of biofuel crops that become invasive; (7) restoring former biofuel production areas; and/or (8) regulating various aspects of production, use, and distribution of biofuels both domestically and internationally. ...

Joseph M. Ditomaso; Jamie K. Reaser; Christopher P. Dionigi; Otto C. Doering; Earl Chilton; Jeffrey D. Schardt; Jacob N. Barney

2010-07-22T23:59:59.000Z

96

Identification of Low Emissions Agricultural Pathways and Priorities for  

Open Energy Info (EERE)

Identification of Low Emissions Agricultural Pathways and Priorities for Identification of Low Emissions Agricultural Pathways and Priorities for Mitigation in Agricultural Landscapes using Integrated Assessment Modeling and Scenarios Jump to: navigation, search Name Identification of Low Emissions Agricultural Pathways and Priorities for Mitigation in Agricultural Landscapes using Integrated Assessment Modeling and Scenarios Agency/Company /Organization CGIAR's Climate Change, Agriculture and Food Security (CCAFS), Canadian International Development Agency (CIDA), the Danish International Development Agency (DANIDA), the European Union, International Fund for Agricultural Development (IFAD) Partner International Institute for Applied Systems Analysis (IIASA) Sector Land Focus Area Agriculture Topics Background analysis, Baseline projection, Low emission development planning, -LEDS, Pathways analysis, Policies/deployment programs

97

Sustainable Urban Development Priorities - Development of a Rapid  

Open Energy Info (EERE)

Sustainable Urban Development Priorities - Development of a Rapid Sustainable Urban Development Priorities - Development of a Rapid Assessment Tool for Urban Mobility in Cities with Data Scarcity Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Sustainable Urban Development Priorities - Development of a Rapid Assessment Tool for Urban Mobility in Cities with Data Scarcity Agency/Company /Organization: Clean Air Asia, The Institute for Transportation and Development Policy (ITDP) Partner: UN Habitat Sector: Land Focus Area: Greenhouse Gas, People and Policy, Transportation Topics: Background analysis, Baseline projection, Co-benefits assessment, - Environmental and Biodiversity, GHG inventory, Low emission development planning, -LEDS, Policies/deployment programs Website: cleanairinitiative.org/portal/node/7870

98

SELECTION OF FACULTY RESEARCH ADVISOR (Submit to the Graduate Education Office, 4404 TBBC)  

E-Print Network [OSTI]

32 ` SELECTION OF FACULTY RESEARCH ADVISOR (Submit to the Graduate Education Office, 4404 TBBC) _____________________________________________________________(date) II. List your top three choices for your research advisor. 1st choice a Departmental Safety Seminar, and the research advisor must assume responsibility for his/her lack of training

Simons, Jack

99

Submitted to the Annals of Applied Statistics INTERPOLATING FIELDS OF CARBON MONOXIDE  

E-Print Network [OSTI]

and transport. CO AMS 2000 subject classifications: Carbon monoxide; satellite data; Bayesian hierarchi- cal models; interpolation; data assimilation 1 imsart-aoas ver. 2007/04/13 file: COpaper.tex date: March 24Submitted to the Annals of Applied Statistics INTERPOLATING FIELDS OF CARBON MONOXIDE DATA USING

Nychka, Douglas

100

NIF NOI 2009_E Page 1 of 6 Notice of Intent to Submit an Application  

E-Print Network [OSTI]

NIF NOI 2009_E Page 1 of 6 Notice of Intent to Submit an Application New Initiatives Fund (NIF Foundation for Innovation NIF NOI 2009_E Page 2 of 6 Date printed (dd/mm/yyyy): 27/06/2008 Canadian

Martin, Jeff

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public Utility District  

E-Print Network [OSTI]

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public paper: Carbon Dioxide Footprint of the Northwest Power System, dated September 13, 2007. The Grant done a very thorough job of assessing the current and future carbon dioxide footprints of the Northwest

102

Submitting a Proposal to DOE | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Submitting a Proposal to DOE Submitting a Proposal to DOE Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Selecting a Host DOE Laboratory Developing a Research Proposal Recommender Information Student Participants Submitting a Proposal to DOE Application Selection Process and Notification Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Submitting a Proposal to DOE Print Text Size: A A A RSS Feeds FeedbackShare Page Through direct collaboration with research staff at DOE host laboratories, the VFP program provides an opportunity for faculty to help create innovative new capabilities and make discoveries germane to DOE science missions. Through the experience, visiting faculty members also develop integrated skills that translate to programs at their home institutions,

103

Cutting Wasteful Spending While Protecting Our Priorities | Department of  

Broader source: Energy.gov (indexed) [DOE]

Cutting Wasteful Spending While Protecting Our Priorities Cutting Wasteful Spending While Protecting Our Priorities Cutting Wasteful Spending While Protecting Our Priorities June 28, 2013 - 4:06pm Addthis Aoife McCarthy Press Secretary, Office of Public Affairs It is essential for Republicans and Democrats in Congress to work together on a budget that cuts wasteful spending while supporting jobs, the economy, and middle-class families. The President has been clear that he will not sign individual appropriations bills that simply attempt to enact the House Republican budget into law, which would hurt our economy and make draconian cuts to middle class priorities. Instead of reinforcing the Administration's all-of-the-above approach to energy, the House Republican Energy and Water Appropriations bill drastically undermines the work of the Department of Energy. It undermines

104

COUNTRY INSTITUTION SIGNING DATE  

E-Print Network [OSTI]

COUNTRY INSTITUTION SIGNING DATE /RENEWAL WEB SITE ALBANIA University of Tirana 11.12.2001 www /RENEWAL WEB SITE FINLAND JAMK University of Applied Sciences 29.10.2009 www.jamk.fi/ FRANCE ?cole INSTITUTION SIGNING DATE /RENEWAL WEB SITE MACEDONIA St. Cyril and Methodius" University of Skopje 11

Di Pillo, Gianni

105

Iraq Produces Date Sugar  

Science Journals Connector (OSTI)

Iraq will soon begin manufacture of sugar from dates as a result of experiments carried out under a UNESCO program by a Swiss scientist. Development of this industry will save the country some $16 million annually formerly spent for imported sugar.Dates ...

1955-04-18T23:59:59.000Z

106

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

107

Dating the Vinland Map  

ScienceCinema (OSTI)

Scientists from Brookhaven National Laboratory, the University of Arizona, and the Smithsonian Institution used carbon-dating technology to determine the age of a controversial parchment that might be the first-ever map of North America.

None

2013-07-17T23:59:59.000Z

108

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

701: Categorical Exclusion Determination 701: Categorical Exclusion Determination Topic B - Cooperation on Electric Resource Planning and Priorities CX(s) Applied: A9, A11 Date: 04/22/2010 Location(s): Denver, Colorado Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory April 22, 2010 CX-001700: Categorical Exclusion Determination Investigation of the Souring Bakken Oil Reservoirs CX(s) Applied: B3.6, A1 Date: 04/22/2010 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory April 22, 2010 CX-001834: Categorical Exclusion Determination Massachusetts-City-New Bedford CX(s) Applied: A1, A9, A11, B1.32, B2.5, B3.6, B5.1 Date: 04/22/2010 Location(s): New Bedford, Massachusetts Office(s): Energy Efficiency and Renewable Energy

109

NIST ITL submits PINS form to ANSI  

E-Print Network [OSTI]

1 NIST ITL submits PINS form to ANSI for initiation of project to draft new or revised ANS. ANSI consensus body, starting with pre- canvass notice and invitation, which is posted on the ANSI/ NIST and develops canvass list. NIST ITL issues 45-day ballot and submits to ANSI for concurrent 45- day public

110

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

111

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

112

Regional Workshop on Opportunities and Priorities for Low Carbon Green  

Open Energy Info (EERE)

Regional Workshop on Opportunities and Priorities for Low Carbon Green Regional Workshop on Opportunities and Priorities for Low Carbon Green Growth in Asia Jump to: navigation, search Tool Summary Name: Regional Workshop on Opportunities and Priorities for Low Carbon Green Growth in Asia Agency/Company /Organization: Asian Development Bank Institute Topics: Policies/deployment programs, Pathways analysis Resource Type: Workshop, Training materials Website: www.adbi.org/cd-roms/2010/08/27/4054.low.carbon.green.growth.asia/ UN Region: Central Asia, Eastern Asia, South-Eastern Asia References: ADB Regional Workshop[1] Contents "Concepts of Low Carbon Green Growth: Challenges and Current Status in the Asia Pacific Region Inside the Low Carbon Green Growth: Innovations in Green Energy Supply Demand Side Energy Efficiency Solutions: A Low Hanging

113

LANL completes high-priority flood and erosion control work  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab completes priority erosion controls Lab completes priority erosion controls LANL completes high-priority flood and erosion control work Crews installed 600 feet of water diversion barriers and removed more than 1,200 cubic yards of sediment in anticipation of flash flooding. July 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

114

Appendix 3 - iManage Help Desk Priority Level  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Appendix 3- iManage Help Desk Priority Levels Priority Level Definitions Resolution Time Critical Prevents normal operational business and for which there is no known workaround. Examples: inability to produce financial statements by required deadline, the inability to pay contractors in accordance with the Prompt Pay Act, the inability to commit or obligation funds, or Total loss of production service to entire customer set, or Impacts one or more service level commitments, or Impacts the delivery schedule Note 1: Reassignment must be communicated and directly agreed upon. Note 2: The initial response time for critical priority tickets must be within 60 minutes. Resolution is around the clock support until service is restored. Closure is

115

Important Purdue and Departmental Dates  

E-Print Network [OSTI]

Purdue holidayno classes this week. ... Once the webform is submitted the link to it becomes inactive but you can still make ... End of Spring TA employment.

116

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

117

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

118

History of Radiocarbon Dating  

DOE R&D Accomplishments [OSTI]

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

119

Create Date: Create Time  

E-Print Network [OSTI]

provisions. AB 0074 Ch. 666 Assembly Member Ma Public event action plans and cooperative agreements. AB 0080 Ch. 138 Assembly Member Fong Presidential primary: election date. AB 0082 Ch. 92 * Assembly Assembly Member Fong Elections: new citizens. AB 0089 Ch. 390 * Assembly Member Hill County employees

120

Quantum Dating Market  

E-Print Network [OSTI]

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Peer Review of Manuscripts Submitted Via the Academy Fellowship Track  

Science Journals Connector (OSTI)

...author and source are credited. Peer Review of Manuscripts Submitted Via...Casadevall A, Collier RJ. 2011. Peer review of manuscripts submitted via...have been scrutinized by several peers, generating reviews in addition to the those submitted...

Arturo Casadevall; R. John Collier

2011-06-01T23:59:59.000Z

122

Amazonian biodiversity: assessing conservation priorities with taxonomic data  

E-Print Network [OSTI]

Amazonian biodiversity: assessing conservation priorities with taxonomic data W. J. KRESS*à , W. R areas recommended for conservation in an earlier qualitative study of Amazonian biodiversity. Museum be addressed. 0960-3115 ? 1998 Chapman & Hall Biodiversity and Conservation 7, 1577±1587 (1998) #12

Erwin, Terry

123

Priority Assignment in Emergency Response Evin Uzun Jacobson1  

E-Print Network [OSTI]

Priority Assignment in Emergency Response Evin Uzun Jacobson1 , Nilay Tanik Argon2 , Serhan Ziya2 and operating rooms) can be overwhelmed by the sudden jump in patient demand. To ration these resources for the greatest number. This article investigates how this can be done and what the potential benefits would be

Ziya, Serhan

124

National Institute of Neurological Disorders and Stroke Strategic Priorities  

E-Print Network [OSTI]

evaluation and management action, for example, is aligned with administration priorities for science are transforming how we think about the brain and approaches to treating maladies. Over the next decade, our the panels recognized that science can advance rapidly and in unexpected ways, they emphasized how the NINDS

125

Research Priorities to Advance Eco-Responsible Nanotechnology  

E-Print Network [OSTI]

Research Priorities to Advance Eco- Responsible Nanotechnology Pedro J. J. Alvarez,, * Vicki Colvin nanotechnology revolution has great potential to enhance a wide variety of products, services, and in- dustries than a future environmental liability, the Interna- tional Council on Nanotechnology (ICON

Alvarez, Pedro J.

126

Permuting machines and priority queues R. E. L. Aldred  

E-Print Network [OSTI]

Permuting machines and priority queues R. E. L. Aldred M. D. Atkinson H. P. van Ditmarsch C. C. Handley D. A. Holton D. J. McCaughan March 31, 2005 Abstract Machines whose sole function is to re-order their input data are consid- ered. Every such machine defines a set of allowable input-output pairs

Atkinson, Mike

127

Structure of pre-Supervisory Committee Meeting (PRE-SCM) report: Abstract of work to date (250 words max)  

E-Print Network [OSTI]

Appendix B Structure of pre-Supervisory Committee Meeting (PRE-SCM) report: Abstract of work to date (250 words max) An abstract of the work to date, providing general background and explaining how the work fits in the field of your project. This abstract can be very similar to the one submitted

Woodgett, Jim

128

Procedures for Submitting Documents for Posting on the DOE NEPA...  

Broader source: Energy.gov (indexed) [DOE]

Procedures for Submitting Documents for Posting on the DOE NEPA Website Procedures for Submitting Documents for Posting on the DOE NEPA Website The Electronic DOE NEPA document...

129

Video Tutorial for Submitting a 2014 ERCAP Request available  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Video Tutorial for Submitting a 2014 ERCAP Request available Video Tutorial for Submitting a 2014 ERCAP Request available September 17, 2013 (0 Comments) Rushing to meet the...

130

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

131

FROM: DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

132

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

133

DDSS: Dynamic Dedicated Servers Scheduling for Multi Priority Level Classes in Cloud Computing  

E-Print Network [OSTI]

Science and Engineering, Bangladesh University of Engineering and Technology, Dhaka, Bangladesh Abstract of resources for each customer class. Fig. 1 shows high and low priorities with and without priority levels without and with priority level. need to use resources (such as, services) efficiently. There- fore

Atiquzzaman, Mohammed

134

DATE: February 7, 1996  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

135

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

136

Priority conservation areas for birds in El Salvador  

E-Print Network [OSTI]

Priority conservation areas for birds in El Salvador INTRODUCTION El Salvador is a small country (2100 km 2 ) situated in the heart of the northern Central America bioregion (southern Mexico, Belize, Guatemala, Honduras and northern Nicaragua... in ecotourism in nearby countries (especially Belize and Costa Rica), led to renewed conservation efforts (Secretar?a Ejecutiva de Medio Ambiente, 1994). The environmental movement during the last decade has inspired wide- spread interest and support...

Komar, Oliver

2002-08-01T23:59:59.000Z

137

Priorities in the design of chemical shops at coke plants  

SciTech Connect (OSTI)

Recent trends in the design of chemical equipment at coke plants are described, through the lens of experience at Giprokoks. The main priorities were to improve the removal of impurities from coke oven gas; to improve equipment design on the basis of new materials; to reduce reagent consumption; to reduce the materials and energy consumed in the construction of new equipment; and to minimize impacts on the environment and worker health. Some technological equipment is briefly characterized.

V.I. Rudyka; Y.E. Zingerman; V.V. Grabko; L.A. Kazak [Giprokoks, the State Institute for the Design of Coke-Industry Enterprises, Kharkov (Ukraine)

2009-07-15T23:59:59.000Z

138

Commercial Building Energy Asset Score Data Collection Priority Map  

Broader source: Energy.gov (indexed) [DOE]

Commercial Building Energy Asset Score Data Collection Priority Map Commercial Building Energy Asset Score Data Collection Priority Map Type Page OFFICE* 1-2 RETAIL 3 SCHOOL 4 WAREHOUSE 5 LODGING* 6 MULTI-FAMILY* 7 ASSEMBLY 8 APPENDIX: ASHRAE CLIMATE ZONE MAP 9 * For the purposes of this guide, some use types have multiple tables based on building size. If you're uncertain which size applies to your building, use your best judgment or consult more than one table. The size categories are meant as general guidelines but do not correspond to specific ranges in square footage. OFFICE Large Office Priorities by Climate Zones 1A 1B 2A 2B 3A 3B 3C 4A 4B 4C 5A 5B 5C 6A 6B 7 8 Lighting High High High High High High High High High High High High High High High High High Lighting Controls High High High High High High High High High High High High High High High High High

139

Iron Phosphate Glasses for Vitrifying DOE High Priority Nuclear Wastes  

SciTech Connect (OSTI)

Iron phosphate glasses have been studied as an alternative glass for vitrifying Department of Energy (DOE) high priority wastes. The high priority wastes were the Low Activity Waste (LAW) and the High Level Waste (HLW) with high chrome content stored at Hanford, WA, and the Sodium Bearing Waste (SBW) stored at the Idaho National Engineering and Environmental Laboratory. These wastes were recommended by Tanks Focus Area since they were expected to require special attention when vitrified in borosilicate glasses. All three of these wastes have been successfully vitrified in iron phosphate glasses at waste loadings ranging from a low of 32 wt% for the high sulfate LAW to 40 wt% for the SBW to a high of 75 wt% for the high chrome HLW. In addition to these desirable high waste loadings, the iron phosphate glasses were easily melted, typically between 950 and 1200 C, in less than 4 hours in commercial refractory oxide containers. It is noteworthy that the chemical durability of both glassy and deliberately crystallized iron phosphate wasteforms not only met, but significantly exceeded, all current DOE chemical durability requirements as measured by the Product Consistency Test (PCT) and Vapor Hydration Test (VHT). The high waste loading, low melting temperature, rapid furnace throughput (short melting time) and their outstanding chemical durability could significantly accelerate the clean up effort and reduce the time and cost of vitrifying these high priority wastes.

Kim, C.W.; Day, D.E.

2004-03-29T23:59:59.000Z

140

Revision Date: 02.10.2009 MATERIAL & DISBURSEMENT SERVICES, TRAVEL SERVICES  

E-Print Network [OSTI]

Revision Date: 02.10.2009 MATERIAL & DISBURSEMENT SERVICES, TRAVEL SERVICES Web Travel Purpose: The web travel system is an electronic solution for departments to submit for approval and generate, and Travel Reimbursements. Web travel is also used in conjunction with the Central Airfare Billing System

Crews, Stephen

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

142

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

143

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

144

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

145

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

146

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

147

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

148

DATE: TO: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

149

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

150

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

151

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

152

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

153

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

154

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

155

Date: Re: Department  

Broader source: Energy.gov (indexed) [DOE]

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

156

J DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

157

Procurement Directors DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

158

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

159

How to Write and Submit a Conference  

E-Print Network [OSTI]

How to Write and Submit a Conference Paper OWISE Graduate Seminar September 17, 2010 Jenna P to this audience? · What do abstracts and papers for this conference look like (check out past conference proceedings)? · Do you know anyone who has had a paper accepted for this conference? · Consider adding a co

Selmic, Sandra

160

Announcement (Submitted to `Photosynthesis Research, 2006)  

E-Print Network [OSTI]

1 Announcement (Submitted to `Photosynthesis Research, 2006) Advances in Photosynthesis, in Advances in Photosynthesis and Respiration (AIPH) Series, of The Structure and Function of Plastids, a book Rochaix, Michel Goldschmidt-Clermont and Sabeeha Merchant); and Volume 14 (Photosynthesis in Algae, edited

Govindjee "Gov"

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Global Climate Change Adaptation Priorities for Biodiversity and Food Security  

E-Print Network [OSTI]

Global Climate Change Adaptation Priorities for Biodiversity and Food Security Lee Hannah 1,2* , Makihiko Ikegami 3 , David G. Hole 1,4 , Changwan Seo 5 , Stuart H. M. Butchart 6 , A. Townsend Peterson 7 , Patrick R. Roehrdanz 2 1 The Betty...72590. doi:10.1371/journal.pone.0072590 Editor: Alex J Cannon, Pacific Climate Impacts Consortium, Canada Received November 13, 2012; Accepted July 14, 2013; Published August 21, 2013 Copyright: 2013 Hannah et al. This is an open-access article...

Hannah, Lee; Ikegami, Makihiko; Hole, David G.; Seo, Changwan; Butchart, Stuart H. M.; Peterson, A. Townsend; Roehrdanz, Patrick

2013-08-21T23:59:59.000Z

162

Type Policy Title Here Effective Date: [Insert Date  

E-Print Network [OSTI]

Type Policy Title Here Effective Date: [Insert Date] Policy Statement [Type Statement Text Here] Reason(s) for the Policy [Type Reason Text Here] Primary Guidance to Which This Policy Responds [Type Primary Policy Here ­ If there is NOT a Primary Policy indicate that] Responsible University Office

Salzman, Daniel

163

Absolute Time Radiometric Dating: the source of the dates on  

E-Print Network [OSTI]

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale Radiometric.g. uranium to lead. · The parent element is radioactive, the daughter element is stable. · The decay rate nucleosynthesis. Common Radioactive Elements, Parents and Daughters · Carbon-14, C14 Nitrogen-14, N14 · Uranium

Kammer, Thomas

164

How can I view submitted materials? | OpenEI Community  

Open Energy Info (EERE)

view submitted materials? Home > Groups > 2014 Geothermal Case Study Challenge Submitted by NickL on 6 May, 2014 - 07:41 1 answer Points: 0 For various reasons, you may want to...

165

How do I submit challenge materials? | OpenEI Community  

Open Energy Info (EERE)

submit challenge materials? Home > Groups > 2014 Geothermal Case Study Challenge Submitted by NickL on 2 May, 2014 - 14:09 1 answer Points: 0 Challenge submission details are...

166

NOVA Portal: Submit VASP Jobs to Carver via the Web  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOVA Portal: Submit VASP Jobs to Carver via the Web NOVA Portal: Submit VASP Jobs to Carver via the Web May 11, 2012 by Francesca Verdier (0 Comments) NOVA is an experimental web...

167

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Broader source: Energy.gov (indexed) [DOE]

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

168

Strategic Plan Submitted to the Secretary  

Broader source: Energy.gov (indexed) [DOE]

4 Volume 1, Number 3 4 Volume 1, Number 3 In This Issue * Executive Order Update * $1 Million for Manhattan Project Preservation * 2004 DOE Cultural Resources Forum * ES&H Cultural Resources Update * FPO Site Visits * Oppenheimer and the Manhattan Project Event * Museum Notes * Save America's Treasures * Featured Photo: Oak Ridge, 1949 Strategic Plan Submitted to the Secretary The strategic plan for history and heritage resources that Secretary Abraham directed the Federal Preservation Officer to prepare has been submitted and is under review. Following the December 2, 2003, briefing at which the Secretary directed preparation of a plan to make recommendations for the full range of the Department's history and heritage resources, FPO Skip Gosling and Deputy FPO Terry Fehner put together a small planning

169

Submitting Organization Hongyou Fan Sandia National Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

 2007 R&D 100 Award Entry Form  Submitting Organization Hongyou Fan Sandia National Laboratories Advanced Materials Laboratory 1001 University Boulevard SE Albuquerque, NM 87106, USA 505-272-7128 (phone) 505-272-7336 (fax) hfan@sandia.gov AFFIRMATION: I affirm that all information submitted as a part of, or supplemental to, this entry is a fair and accurate represen- tation of this product. Submitter's signature_______________________________ Earl Stromberg Lockheed Martin Aeronautics Mail Zone 2893 PO Box 748 Fort Worth, TX 76101, USA 817-763-7376 (phone) 817-762-6911 (fax) Earl.W.Stromberg@lmco.com Self-Assembling Process for Fabricating Tailored Thin Films This simple, economical nanotechnology coating process enables the development of nanoparticle thin films

170

WIPP - How to submit a FOIA request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to submit a Freedom of Information Act (FOIA) request FOIA requests to the U.S. Department of Energy Carlsbad Field Office (CBFO) may be submitted by request form, letter, fax, or e-mail. You may contact CBFO at the following address: George W. Hellstrom Freedom of Information Act/Privacy Act Public Liaison U.S. Department of Energy Carlsbad Field Office P.O. Box 3090 4021 National Parks Highway Carlsbad, New Mexico 88221-3090 foialiaison@ FOIA requests may be mailed or faxed to (505) 234-7025, e-mailed to the Freedom of Information Act /Privacy Act Public Liaison, or submitted electronically using the FOIA Request form. Clearly mark the envelope, fax, or e-mail "Freedom of Information Act request." Describe the records you are requesting as completely and accurately as possible, and provide your name, address, and telephone number. A telephone call between the requester and the FOIA contact person may be necessary to clarify a request and expedite processing time.

171

Conference dates 1620 April 2012  

E-Print Network [OSTI]

Conference dates 16­20 April 2012 Location The Square Conference Centre Brussels, Belgium www/nanotechnologies Mark your Calendar #12;Conference dates 16­20 April 2012 The Square Conference Centre Brussels, Belgium success, Photonics Europe 2012 will again feature choice conferences and plenary presentations

Jahns, Jürgen

172

April 26, 2004 Northwest Power and Conservation Council Submitted to  

E-Print Network [OSTI]

for the Future Role of BPA in Power Supply. These comments are submitted on behalf of Alcoa Inc. which owns and necessary task of defining BPA's future role in power supply. Alcoa has joined with other BPA customers in submitting joint comments and also submits the following additional comments. 1. The list of "goals" for BPA

173

Priority Areas For Past SCGSR Solicitations | U.S. DOE Office...  

Office of Science (SC) Website

Priority Areas For Past SCGSR Solicitations DOE Office of Science Graduate Student Research (SCGSR) Program SCGSR Home Eligibility Benefits Participant Obligations How to Apply...

174

PRS -- A priority ranking system for managing pipeline integrity  

SciTech Connect (OSTI)

Pipeline operating companies have a huge investment in pipelines that vary in age from recent construction to more than 50 years old. Aging pipelines contain a variety of operational integrity concerns that most often begin to show up as leaks, but sometimes result in ruptures if not detected soon enough. Fluor Daniel Williams Brothers (FDWB) has developed a management tool that helps pipeline operating companies address this concern and take a proactive approach to pipeline integrity management. Using this methodology, a Priority Ranking System (PRS) is developed which allows early detection and resolution of pipeline integrity concerns. When fully developed, it includes a spreadsheet of annual budgets related to pipeline integrity work and a complete historical record of inspection and rehabilitation results.

Hodgdon, A.M. [Fluor Daniel Williams Brothers, Houston, TX (United States); Wernicke, T. [Texas Utilities Fuel Co., Dallas, TX (United States)

1997-05-01T23:59:59.000Z

175

DOE Warns Manufacturers Who Submitted Incomplete Certification Reports |  

Broader source: Energy.gov (indexed) [DOE]

Warns Manufacturers Who Submitted Incomplete Certification Warns Manufacturers Who Submitted Incomplete Certification Reports DOE Warns Manufacturers Who Submitted Incomplete Certification Reports February 2, 2010 - 1:53pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has sent warning letters to 9 manufacturers or trade associations that submitted incomplete energy-efficiency test data to comply with DOE's energy-efficiency standards. This data was submitted during the 30-day grace period that ran from December 9, 2009, to January 8, 2010. Data for about 600,000 products was submitted. In this case, however, the data was incomplete. In light of the apparent attempt to comply with Department's regulations, the warning letters simply identify various substantive deficiencies in the data submitted, demand their expeditious

176

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

177

OCCURRENCE AND REMOVAL OF PRIORITY POLLUTANTS BY1 LAMELLA CLARIFICATION AND BIOFILTRATION2  

E-Print Network [OSTI]

1 OCCURRENCE AND REMOVAL OF PRIORITY POLLUTANTS BY1 LAMELLA CLARIFICATION AND BIOFILTRATION2 Johnny priority substances (n = 41) listed in the10 Water Framework Directive and additional substances (n = 47) in raw sewage, as well as the11 removal performance of lamella clarification and biofiltration techniques

Paris-Sud XI, Université de

178

Report from the Stroke Research Priorities Meeting: Top scientific research opportunities from Workgroups on Stroke  

E-Print Network [OSTI]

1 Report from the Stroke Research Priorities Meeting: Top scientific research opportunities from Workgroups on Stroke Prevention, Treatment, and Recovery Research In 2011, the NINDS began a two-phase planning process in order to identify the highest priority research areas in stroke to address over

179

Toward an Optimal Fixed-Priority Algorithm for Energy-Harvesting Real-Time Systems  

E-Print Network [OSTI]

on their energy consumption. Thus, the results of this work rely on the assumption that tasks energy consumptionToward an Optimal Fixed-Priority Algorithm for Energy-Harvesting Real-Time Systems Yasmina the real-time xed-priority scheduling problem for battery-powered embedded systems whose energy storage

Paris-Sud XI, Université de

180

Approximate Response Time for Fixed Priority Real-Time Systems with Energy-Harvesting  

E-Print Network [OSTI]

Approximate Response Time for Fixed Priority Real-Time Systems with Energy-Harvesting Yasmina sufficient schedulability tests for fixed-priority pre-emptive scheduling of a real-time system under energy constraints. In this problem, energy is harvested from the ambient environment and used to replenish a storage

Boyer, Edmond

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future  

Open Energy Info (EERE)

USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future Jump to: navigation, search Tool Summary Name: USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future Agency/Company /Organization: United States Agency for International Development (USAID) Sector: Climate, Energy Focus Area: Renewable Energy, Economic Development Topics: GHG inventory, Low emission development planning, Policies/deployment programs Resource Type: Publications User Interface: Other Website: redd-net.org/resource-library/Energy+Trends+in+Developing+Asia%3A+Prio Language: English USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future Screenshot References: USAID-Energy Trends in Developing Asia: Priorities for a Low-Carbon Future[1]

182

Wind Powering America - Outreach in Priority States (Poster)  

SciTech Connect (OSTI)

WPA works with 33 State Wind Working Groups to educate stakeholders on wind energy topics and to achieve the basics needed for effective wind development in a state. WPA has accelerated outreach and communication efforts with 13 priority states: Alaska, Arizona, Indiana, Maryland, Massachussetts, Michigan, Nebraska, Nevada, North Carolina, Ohio, South Dakota, Utah, and Virginia. These states have the potential to contribute substantially to the national portfolio of wind energy but do not yet have large amounts of wind energy applications on the ground. This is often due to barriers in in-state knowledge and understanding of wind energy issues and potential that impact the policy environment and the market environment. There are common regional issues among the states, and important learning opportunities can be gained by cross-training and sharing experiences. The Regional Wind Energy Institutes (RWEIs) are train-the-trainer organizations that work to develop a cadre of in-state outreach specialists who reach out to audiences of decisionmakers (e.g., the ag community, state and local officials, utilities, regulatory bodies) to build understanding, create public acceptance, take advantage of regional synergies, and eventually to impact polices and the market environment for effective wind implementation.

Kelly, M.; Flowers, L.

2009-04-01T23:59:59.000Z

183

Geologic Analysis of Priority Basins for Exploration and Drilling  

SciTech Connect (OSTI)

There has been a substantial decline in both exploratory drilling and seismic field crew activity in the United States over the last 10 years, due primarily to the declining price of oil. To reverse this trend and to preserve the entrepreneurial independent operator, the U.S. DOE is attempting to encourage hydrocarbon exploration activities in some of the under exploited regions of the United States. This goal is being accomplished by conducting broad regional reviews of potentially prospective areas within the lower 48 states. Data are being collected on selected areas, and studies are being done on a regional scale generally unavailable to the smaller independent. The results of this work will be made available to the public to encourage the undertaking of operations in areas which have been overlooked until this project. Fifteen criteria have been developed for the selection of study areas. Eight regions have been identified where regional geologic analysis will be performed. This report discusses preliminary findings concerning the geology, early tectonic history, structure and potential unconventional source rocks for the Black Mesa basin and South Central states region, the two highest priority study areas.

Carroll, H.B.; Reeves, T.K.

1999-04-27T23:59:59.000Z

184

EPA Tier2 Submit Software Webpage | Open Energy Information  

Open Energy Info (EERE)

Software Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Tier2 Submit Software Webpage Author United States Environmental Protection...

185

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes  

E-Print Network [OSTI]

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes: Theranostic Nanocarriers for cancer diagnostics and treatment open the field of "theranostics", i.e. combination of imaging

186

Idaho Statement of Completion for Submitting Proof of Beneficial...  

Open Energy Info (EERE)

Proof of Beneficial Use (DWR Form 217). 112009. Retrieved from "http:en.openei.orgwindex.php?titleIdahoStatementofCompletionforSubmittingProofofBeneficialUse(DWR...

187

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

188

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

189

DATE:  

Broader source: Energy.gov (indexed) [DOE]

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

190

DATE  

Broader source: Energy.gov (indexed) [DOE]

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

191

DATE  

Broader source: Energy.gov (indexed) [DOE]

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

192

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

193

DATE  

Broader source: Energy.gov (indexed) [DOE]

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

194

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

195

DATE  

Broader source: Energy.gov (indexed) [DOE]

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

196

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

197

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

198

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

199

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

200

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

202

DATE  

Broader source: Energy.gov (indexed) [DOE]

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

203

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

204

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

205

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

206

DATE  

Broader source: Energy.gov (indexed) [DOE]

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

207

DATE  

Broader source: Energy.gov (indexed) [DOE]

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

208

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

209

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

210

DATE  

Broader source: Energy.gov (indexed) [DOE]

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

211

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

212

DATE  

Broader source: Energy.gov (indexed) [DOE]

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

213

DATE  

Broader source: Energy.gov (indexed) [DOE]

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

214

DATE  

Broader source: Energy.gov (indexed) [DOE]

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

215

DATE  

Broader source: Energy.gov (indexed) [DOE]

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

216

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

217

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

218

DATE  

Broader source: Energy.gov (indexed) [DOE]

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

219

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

220

Date:  

Office of Legacy Management (LM)

1.45 10.06 0.99 0.04786 2.85 0.13 1.30 Froude Number Flow Type Notes Messages 0.66 Subcritical 0.64 Subcritical 0.41 Subcritical 0.58 Subcritical 0.48 Subcritical 0.42...

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

understand what is required to be a nuclear supplier. 6. Gen IV Fabrication Centric Roadmap The objective of this program is to develop a succinct document that will allow...

222

Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that Sandia contracts are settled for a reasonable amount and that no instances of fraud related to these contracts is apparent. We will not report on the adequacy of your...

223

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 E-2 IWFDP Volume 1 (Process Strategy) provides the basis for how the double-shell tanks (DST) will be used to stage and deliver waste feed to the WTP. This volume provides an...

224

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of approximately 55 Mgal 1 of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The Hanford Federal Facility...

225

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The...

226

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a...

227

DATE:  

Office of Legacy Management (LM)

(w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following...

228

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and repairing wastewater systems lines and connections that could impact the discharge to wastewater systems. 8. Drinking Water Contamination - Performing maintenance activities on...

229

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Release; Further Dissemination Unlimited By Janis D. Aardal at 1:25 pm, Jan 31, 2013 DOERL-2001-41 Revision 6 SITEWIDE INSTITUTIONAL CONTROLS PLAN FOR HANFORD CERCLA RESPONSE...

230

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

buildings"..., and Overarching EC INL-05-002 "Critical Infrastructure Protection (CIP) Program ... Justification: Removal of the interior walls and mezzanines will be a...

231

DATE:  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Corporations Section 743 Any Payment for the Election for a Federal Office or to a Political Committee Section 3003 Reporting on Conference Spending 2 The FAL addresses the...

232

DATE:  

Energy Savers [EERE]

Corporations * Section 735 Any Payment for the Election for a Federal Office or to a Political Committee * Section 742 Reporting on Conference Spending The FAL addresses the...

233

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Impact: Generating and Managing Waste - The proposed activity would generate scrap metal and industrial waste. Project personnel will contact Waste Generator Services (WGS) to...

234

DATE:  

Energy Savers [EERE]

Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement...

235

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will rest on a new concrete foundation and house the necessary heating, ventilation and air conditioning (HVAC), electrical, life safety and communications systems but will not...

236

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233Th-232 contaminated materials (minor...

237

DATE:  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 provides implementing...

238

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building The INL must operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs,...

239

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

es...A-i Appendix B Estimation of Selected Single-Shell Tank Heat Generation Rates...B-i RPP-RPT-54981, Revision 0 ii List of...

240

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing...

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE:  

Office of Environmental Management (EM)

has been revised. The subject form has been posted on the DOE Financial Assistance web page on the Recipients Page under the Financial Assistance Forms and Information for...

242

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A. Project Title: Innovative Manufacturing Process for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing...

243

DATE  

Broader source: Energy.gov (indexed) [DOE]

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

244

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

245

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

246

Radiokrypton dating finally takes off  

Science Journals Connector (OSTI)

...dating, based on the well-known radioactive decay...essentially has a single, well-mixed, and steady source, the...fortunately it works well for noble gases...Isolation Pilot Plant, New Mexico . J Contam Hydrol 160...radionuclides in Yellowstone geothermal gas emissions: A reconnaissance...

Werner Aeschbach-Hertig

2014-01-01T23:59:59.000Z

247

White Papers Submitted to the Technology Innovation Program  

E-Print Network [OSTI]

White Papers Submitted to the Technology Innovation Program interested parties to submit white papers describing an area of critical national need and how those needs-risk, high-reward R&D. White papers could discuss any area of critical national need of interest

Magee, Joseph W.

248

Priority-Based Internet Access Control for Fairness Improvement and Abuse Reduction  

Science Journals Connector (OSTI)

In this paper, we exploit a prioritized-service architecture and apply a priority based traffic control scheme to reduce abusive Internet access, improve fairness among users and study users. behavior under a ...

Tsung-Ching Lin; Yeali S. Sun

2003-01-01T23:59:59.000Z

249

"Tier","PRIORITY","Total Tickets Logged","Tickets Closed","Currently...  

Broader source: Energy.gov (indexed) [DOE]

"TOTAL",,255,261,0 "SCR",,255,255,0 ,,0.9843137255,0.9616858238 "Total Issues Report - ESS",,,,"20120101 - 20120418" "Tier","PRIORITY","Total Tickets Logged","Tickets...

250

Priority Science Questions How are ocean ecosystems and the biodiversity they support  

E-Print Network [OSTI]

#12;2 Priority Science Questions · How are ocean ecosystems and the biodiversity they support) is the diversity and geographical distribution of coastal marine habitats changing, and what are the implications

Christian, Eric

251

American Foreign Policy: A Time for a Shift in Priorities and Instruments  

E-Print Network [OSTI]

In the post 9/11 world of American Foreign Policy, where interdependence and globalization are variables that influence every aspect of world affairs, what should the priorities of the United States be and what instruments of foreign policy...

Issa, Patrick 1989-

2011-05-05T23:59:59.000Z

252

Placing microalgae on the biofuels priority list: a review of the technological challenges  

Science Journals Connector (OSTI)

...1004 18 31 69 Placing microalgae on the biofuels priority list: a review of the technological...provide various potential advantages for biofuel production when compared with traditional...production systems. microalgae|algae|biofuel|biorefinery|biodiesel|green diesel...

2010-01-01T23:59:59.000Z

253

DFG Priority Program RoboCup (SPP-1125) Cooperating Teams of Mobile Robots in Dynamic Environments  

Science Journals Connector (OSTI)

The priority program 1125 of the Deutsche Forschungsgemeinschaft funds research on methods, components and tools in the domain of cooperating teams of mobile robots operating in dynamic environments. An important...

Thomas Christaller

2002-01-01T23:59:59.000Z

254

Collection Policy: DESIGN & ENVIRONMENTAL ANALYSIS Subject Scope | Priority Tables | Other policies . . .  

E-Print Network [OSTI]

and in architecture, landscape architecture, environmental psychology, business and city and regional planningCollection Policy: DESIGN & ENVIRONMENTAL ANALYSIS Subject Scope | Priority Tables | Other policies The Department of Design and Environmental Analysis is concerned with the planning design and management

Angenent, Lars T.

255

How to Submit a FOIA Request | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to Submit a FOIA Request | National Nuclear Security Administration to Submit a FOIA Request | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Operations > NNSA Office of General Counsel > Freedom of Information Act (FOIA) > How to Submit a FOIA Request How to Submit a FOIA Request FOIA requests to the NNSA/Office of the General Counsel may be submitted in

256

National Electric Transmission Congestion Study 2012 - How to Submit  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study 2012 - How to National Electric Transmission Congestion Study 2012 - How to Submit Comments National Electric Transmission Congestion Study 2012 - How to Submit Comments You may submit written comments to Congestionstudy2012@hq.doe.gov or by mail to: Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 The Department intends to use only data that is publicly available for this study. Accordingly, please do not submit information that you believe is or should be protected from public disclosure. DOE is responsible for the final determination concerning disclosure or nondisclosure of information submitted to DOE and for treating it in accordance with the DOE's Freedom of Information regulations (10 CFR 1004.11). All comments received by DOE

257

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Broader source: Energy.gov (indexed) [DOE]

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

258

Environmental Programs: Status of Work and Current Priorities for FY13  

SciTech Connect (OSTI)

Presentation outline is: Mission/overview, Regulatory framework, Current status of cleanup, Shift in priorities to address highest risk, Removal of above-ground waste, Continued focus on protecting water resources, and Priorities for fiscal year 2013. LANL's Environmental Mission is to: (1) Repack and ship legacy transuranic waste containers; (2) Investigate and remediate Cold War (legacy) hazardous and radioactive waste areas; (3) Demolish unused buildings; (4) Disposition solid waste from Laboratory operations; and (5) Lifecycle cost nearly $3 billion.

Jones, Patricia [Los Alamos National Laboratory

2012-08-17T23:59:59.000Z

259

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

260

Save the Date - NTSF 2013  

Broader source: Energy.gov (indexed) [DOE]

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Submit a Buy American Complaint | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Center » Submit a Buy American Complaint Action Center » Submit a Buy American Complaint Submit a Buy American Complaint Buy American Resources Section 1605 of the American Recovery and Reinvestment Act of 2009 sets forth the Buy American requirements for recipients of Recovery Act financial assistance, including EECBG recipients. If you have reason to believe that a vendor or grant recipient is violating the Buy American Requirements of the Recovery Act, which apply to iron, steel, or manufactured goods in a public works project funded by DOE, please provide the information that you have in support of that belief to BuyAmericanComplaints@hq.doe.gov. EERE Buy American Guidance Report an Appliance Regulation Violation Report Fraud to the IG Submit a Buy American Complaint FAQs Related to the Recovery Act

262

Linking Models and Data on Vegetation Structure Submitted to  

E-Print Network [OSTI]

Linking Models and Data on Vegetation Structure Submitted to: Journal of Geophysical Research the original development of "Nachhaltigkeit" or in English "sustainability" with the Germans in the mid-18th

Moorcroft, Paul R.

263

MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Submitted by  

E-Print Network [OSTI]

THESIS MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Submitted by Jared Tucker Heath 2011 All Rights Reserved #12;ii ABSTRACT MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Winter recreation, consisting of snowshoeing, skiing, snowboarding, and snowmobiling, has been increasing

MacDonald, Lee

264

Abstract Submitted for the DPP07 Meeting of  

E-Print Network [OSTI]

Abstract Submitted for the DPP07 Meeting of The American Physical Society Sorting Category: 5-interface periodic-cylinder configuration. In this work, we per- form a stability scan over pressure and for a two

Hudson, Stuart

265

,~ Abstract Submitted to 1997 Denver X-Ray Conference  

E-Print Network [OSTI]

,~ Abstract Submitted to 1997 Denver X-Ray Conference Denver, Colorado -August 4-8, 1997 BNL-.64346 being distributed through the entire volume of the particle needs further investigation. *Work supported

Brookhaven National Laboratory

266

Abstract Submitted for the DPP97 Meeting of  

E-Print Network [OSTI]

Abstract Submitted for the DPP97 Meeting of The American Physical Society Sorting Category: 5 solve these problems. 1 This work supported by DoE Contract DE­AC02­76CH03073. Prefer Oral Session X

Hammett, Greg

267

Top U.S. Nuclear Official Commends Industry for Submitting 3rd...  

Energy Savers [EERE]

Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting...

268

Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted)  

Broader source: Energy.gov (indexed) [DOE]

Appropriate Acquisition Strategy Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted) Validator: Kevin Thornton, NNSA/NSO Date: 2/14/2011 Contact: Robert Platoni/702-295-0815 Statement: The selection of an acquisition strategy that is appropriate for current market conditions, funding constraints, and project scope can result in more competitive bidding and lower bid prices. Discussion: The scope of this project was to construct two new fire stations to replace existing outdated facilities. The project was originally planned as two separate projects to be constructed in two different fiscal years using a design/bid/build acquisition strategy. The funding profile was appropriate for this type of strategy. In FY2004, Congress directed that the two projects be

269

Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted)  

Broader source: Energy.gov (indexed) [DOE]

of Peripheral Scope of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted) Validator: Dawn Harder Date: 12/16/2010 Contact: 505-845-6314 Statement: A common understanding of the project scope is essential for project success. Additionally, agreeing on the treatment of scope that is similar but not part of the project scope is also necessary. Discussion: The Sandia Site Office (SSO) and Sandia National Laboratories (SNL) disagreed on the treatment of two separate scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. The first scope involved the early shutdown of the steam plant. During the initial planning and design, the Engineer and the SNL Plant Engineers studied the effect(s) expected to be experienced at the steam plant as load was successively removed during the planned three years

270

Health assessment for Griffiss Air Force Base NPL (National Priorities List) site, Rome, Oneida County, New York, Region 2. CERCLIS No. NY4571924451. Final report  

SciTech Connect (OSTI)

The Griffiss Air Force Base National Priorities List Site is located near the City of Rome, New York. Most of these sites have not been sufficiently investigated at this time for a complete determination of their possible health effects. Residential wells south of Griffiss Air Force Base are contaminated with volatile organic compounds: trichloroethene and 1,1,2,2-tetrachloroethane. The measured concentrations of trichloroethene and 1,1,2,2-tetrachloroethane, to date, are below levels of concern. The site is of potential public health concern because of the risk to human health that could result from possible future exposure to hazardous substances at levels that may result in adverse health effects over time.

Not Available

1988-06-09T23:59:59.000Z

271

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

272

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

273

Comment submitted by Traulsen regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Traulsen regarding the Energy Star Verification Testing Program

274

Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

275

Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

276

The expressiveness of CSP extended by priority A.W. Roscoe  

E-Print Network [OSTI]

The expressiveness of CSP extended by priority (draft) A.W. Roscoe Oxford University Department of Computer Science October 17, 2014 Abstract In previous work [27, 26] the author defined a notion of CSP with such an operational semantics can be translated into CSP and therefore has a semantics in every model of CSP

Oxford, University of

277

White Paper on Magnetic Fusion Energy Priorities by Paul M. Bellan, Professor of Applied Physics, Caltech  

E-Print Network [OSTI]

White Paper on Magnetic Fusion Energy Priorities by Paul M. Bellan, Professor of Applied Physics, Caltech It is important to make ITER work (surpass fusion breakeven) and it is equally important for ITER there will be problems with plasmawall interactions or materials. There are many possible types of problems or there may

278

Research priorities in modeling the transmission risks of H7N9 bird flu  

Science Journals Connector (OSTI)

As a new emerging infection, good system for surveillance and prediction of H7N9 bird flu outbreak is very important. Research priorities in modeling the transmission risks of H7N9 bird flu include many mulitdisciplinary approaches and international collaboration. Image: H7N9 migration from bird genetic mutation to human outbreak.

Viroj Wiwanitkit; Benyun Shi; Shang Xia; Guo-Jing Yang; Xiao-Nong Zhou; Jiming Liu

2013-08-08T23:59:59.000Z

279

Priority Setting for Government Investment in Forestry Conservation Schemes-An Example from New Zealand1  

E-Print Network [OSTI]

's international reputation for its technically advanced approaches to conservation and protection of soilPriority Setting for Government Investment in Forestry Conservation Schemes-An Example from New Zealand1 Colin L. 0'Loughlin2 Abstract: In New Zealand responsibilityfor funding flood protection

Standiford, Richard B.

280

2013 Winter Pell Grant Application Priority Deadline: November 16th, 2012  

E-Print Network [OSTI]

2013 Winter Pell Grant Application Priority Deadline: November 16th, 2012 STUDENT INFORMATION to be considered for the Pell Grant for the winter 2013 semester must complete this form. Please review requested documents to our office. Additional Pell Grant Requirements: · You must be eligible for the Pell

Maryland, Baltimore County, University of

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Framework for Information Sharing with Privacy and Priority Control in Long-Term Care in Japan  

Science Journals Connector (OSTI)

In this paper, the authors present a framework for information sharing with privacy and priority control in long-term care designed to promote appropriate information sharing among the people who are involved in long-term care for provision of better ... Keywords: Information Sharing, Long-Term Care, Multi-Agent System, Research, e-Health

Shoko Miyagawa, Shigeichiro Yamasaki, Eiko Uchiyama, Donald L. Amoroso

2014-01-01T23:59:59.000Z

282

Mapping cost-effective farmland preservation priorities A project funded the USDA NRI Rural Development Program  

E-Print Network [OSTI]

Mapping cost-effective farmland preservation priorities A project funded the USDA NRI Rural Development Program Project Director: Frank Davis, University of California Santa Barbara Project Staff: David Stoms, Jason Kreitler Project Advisors: Tim Duane, Julie Gustanski, Ralph Heimlich, Dan Press, Peter

California at Santa Barbara, University of

283

Periodic Charging Scheme for Fixed-Priority Real-Time Systems with Renewable Energy  

E-Print Network [OSTI]

to the limited capacity of the energy storage unit. With energy harvesting, in theory it becomes possiblePeriodic Charging Scheme for Fixed-Priority Real-Time Systems with Renewable Energy Mario Bambagini, Fairfax, VA, USA e-mail: aydin@cs.gmu.edu Abstract--Energy harvesting systems are gaining increasing

Aydin, Hakan

284

Priority-Based Broadcasting of Sensitive Data in Error-Prone Wireless Networks  

E-Print Network [OSTI]

in its Binary-Coded Decimal (BCD) representation. In BCD, each decimal digit is represented as a 4 bits that benefits from network coding. We also consider the case of burst errors and discuss how can we make our--Symbol-level coding, broadcasting, reliability, burst error, random linear network coding, priority, wireless networks

Wu, Jie

285

SymposiumClinical Research Priority Program University of Zurich "Viral Infectious Diseases"  

E-Print Network [OSTI]

of Biosystems Science and Engineering (BSSE), ETH Zurich 15:25 Coffee break Part II: Metagenomics ­ ChairSymposiumClinical Research Priority Program ­ University of Zurich "Viral Infectious Diseases:00 Great Lecture Hall WEST, UniversityHospital Zurich, Raemistrasse 100, Zurich 14:00 Welcome

Zürich, Universität

286

Title: Amazon Basin/Eugene Wetlands (199205900) and Willamette Valley Wide Acquisition of Priority Habitats  

E-Print Network [OSTI]

Title: Amazon Basin/Eugene Wetlands (199205900) and Willamette Valley Wide Acquisition of Priority #12;Slide Title Here #12;West Eugene Wetlands Partnership · City of Eugene · The Nature Conservancy sp. in West Eugene Wetlands) Biological Diversity of Willow Creek #12;Federally Listed Species #12

287

Priority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System  

E-Print Network [OSTI]

for preservation of selected operating priorities and the effect that operating constraints have on systemPriority Based Reservoir Optimization using Linear Programming: Application to Flood Operation of the Iowa/Des Moines River System By MATTHEW JASON BROWN B.S. (The Pennsylvania State University) 1995

Lund, Jay R.

288

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Broader source: Energy.gov (indexed) [DOE]

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

289

Absolute Time Radiometric Dating: the source  

E-Print Network [OSTI]

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale #12 as an element changes to another element, e.g. uranium to lead. · The parent element is radioactive · Carbon-14, C14 Nitrogen-14, N14 · Uranium-235, U235 Lead-207, Pb207 · Potassium-40, K40 Argon-40, Ar40

Kammer, Thomas

290

Jordan J. Gerth A dissertation submitted in partial fulfillment of  

E-Print Network [OSTI]

Sky Cover By Jordan J. Gerth A dissertation submitted in partial fulfillment of the requirements, Professor, Atmospheric and Oceanic Sciences #12;#12;i Sky Cover Jordan J. Gerth1 Department of Atmospheric, Madison, Wisconsin 1 Corresponding author address: Jordan Gerth, Cooperative Institute for Meteorological

Wisconsin at Madison, University of

291

Instructions for Submitting Document to OpenNet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Document to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't...

292

Submitted to Statistical Science Mapping Energy Landscapes of  

E-Print Network [OSTI]

(ELMs) which characterize and visualize an energy function with a tree structure, in which each leafSubmitted to Statistical Science Mapping Energy Landscapes of Non-Convex Learning Problems Maria-convex in various model spaces and thus are difficult to analyze. In this paper, we compute Energy Landscape Maps

Zhu, Song Chun

293

SUBMITTED TO JSAC, FEB. 2005 1 Distributed Interference Compensation for  

E-Print Network [OSTI]

SUBMITTED TO JSAC, FEB. 2005 1 Distributed Interference Compensation for Wireless Networks Jianwei Huang, Randall Berry, Michael L. Honig Abstract We consider a distributed power control scheme for wireless ad hoc networks, in which each user announces a price that reflects compensation paid by other

Kuzmanovic, Aleksandar

294

MCP Submitted Targeting the Human Cancer Pathway Protein  

E-Print Network [OSTI]

MCP Submitted Targeting the Human Cancer Pathway Protein Interaction Network by Structural Genomics for targeting co-functioning proteins by structural genomics projects. 2 byonMay28,2008www of the human genome sequence (4-6), the use of automated sequencing technology, and the development

Gerstein, Mark

295

Green Fund Report, Submitted to the Green University Planning Committee,  

E-Print Network [OSTI]

and final report submitted, January 2012 5 2011 January Compost Visioning Workshop (PGPIRG) Original budget potential study (Steve Helle, Geoff de Ruiter) Original budget: $5000 Final cost: $5000 · completed- progress 11 2012 May University Farmers' Market communication (UFM) Original budget: $5522 Final cost

Owens, Philip

296

Energy Minimization Accelerated with FPGAs Thesis submitted in partial fulfillment  

E-Print Network [OSTI]

implementation for that part of the computation. iv #12;Contents 1 Introduction 1 1.1 What is Energy Minimization between Energy Minimization and Molecular Dynamics . . . . 7 2.3 Content of Energy Minimization Terms' & $ % Energy Minimization Accelerated with FPGAs Huaxin Dai Thesis submitted in partial

Herbordt, Martin

297

SUBMITTED TO GRL 1 Thermal Anisotropies in the Solar Wind  

E-Print Network [OSTI]

SUBMITTED TO GRL 1 E Thermal Anisotropies in the Solar Wind: vidence of Heating by Interstellar cyclotron instabilit s generated by newly created pickup ions and heats the thermal solar wind protons TO GRL 2 T Introduction he thermal anisotropy of the solar wind is the ratio between the temperatures p

Richardson, John

298

Aluminum Removal from Photographic Waste Submitted to Dr. Tony Bi  

E-Print Network [OSTI]

Aluminum Removal from Photographic Waste Submitted to Dr. Tony Bi By: Kristen Favel, Tiffany Jung, and Kenny Tam CHBE 484 University of British Columbia April 15, 2009 #12;ii "Aluminum Removal from photographic waste has shown elevated levels of aluminum in the fixer, which exceed sewer discharge standards

299

Submitted to Operations Research manuscript OPRE-2009-09-406  

E-Print Network [OSTI]

the problem of making advance energy commitments for wind farms in the pres- ence of a storage device with conversion losses, mean-reverting price process, and an auto-regressive energy generation process from wind Programming, Energy History : This paper was first submitted on September 4, 2009 and has been revised and re

Powell, Warren B.

300

Vehicle arrived for disposal Date Disposal of Asset form approved (copy required) Date  

E-Print Network [OSTI]

Colour Engine (ltrs) Fuel (ulp/diesel) Transmission (auto/manual) Compliance date Kilometres Additions-BusinessSolutions@anu.edu.au Post auction report from Pickles received. Date (ie Sold at General Auction, passed-in etc) Cheque

Botea, Adi

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

302

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

Broader source: Energy.gov (indexed) [DOE]

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

303

Priorities and practises for developing low carbon vehicle networks in small open economies  

Science Journals Connector (OSTI)

The opportunities presented by the emerging green economy offer a variety of solutions to pressing, social, economic, technological and environmental questions. The exploitation of renewable, clean energy sources would offer not just a solution to environmental and health concerns but also the potential for business growth that could help reprieve stricken economies. One of the key sectors of the green economy is that of transport and significant efforts have been made by national and supranational actors to promote the emerging low carbon vehicle. While emission reduction remains the over-riding priority driving the move toward carbon-free motoring, other factors also influence the decision of national actors to develop electric vehicle (EV) networks in particular. This article examines the priorities for small open, economies (SOEs) in developing these networks using the examples of Israel, Denmark and in particular that of Ireland.

Jason Begley

2011-01-01T23:59:59.000Z

304

Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APPENDIX B: APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers Standards* Low B-5 Lamps, Incandescent General Service Standards Low B-31 Test Procedure* Low B-6 Test Procedure Low B-32 Commercial Water-Cooled A/C & Water- Source Heat Pumps Standards Low B-7 Lamps, Incandescent Reflector Standards Low B-33

305

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Cooperative Research and Cooperative Research and Development Agreements at the Department of Energy's Office of Science Laboratories DOE/IG-0826 September 2009 Department of Energy Washington, DC 20585 September 30, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Cooperative Research and Development Agreements at the Department of Energy's Office of Science Laboratories: BACKGROUND Technology transfer, disseminating technology developed by the Department of Energy's laboratories to the general science community and the public, including non-Federal technology partners, and private firms, is one of the Department's top priorities. One of the ways in which this transfer is accomplished is through the use of Cooperative

306

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

The Department of Energy's American Recovery and Reinvestment Act - Florida State Energy Program OAS-RA-10-12 June 2010 Department of Energy Washington, DC 20585 June 7, 2010 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedm Inspector General an SUBJECT: INFORMATION: American Recover Program" Audit Report on "The Department of Energy's y and Reinvestment Act - Florida State Energy BACKGROUND The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's

307

Clean Cities: Submitting Project Ideas for the Clean Cities National Parks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Project Ideas for the Clean Submitting Project Ideas for the Clean Cities National Parks Initiative to someone by E-mail Share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Facebook Tweet about Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Twitter Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Google Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Delicious Rank Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Digg Find More places to share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on AddThis.com... Goals & Accomplishments

308

Winter Study Rebate Form 2012 Date______________________________ ID #________________________________  

E-Print Network [OSTI]

Winter Study Rebate Form 2012 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

309

Winter Study Rebate Form 2013 Date______________________________ ID #________________________________  

E-Print Network [OSTI]

Winter Study Rebate Form 2013 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

310

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

311

SAVE THE DATE!!! The Silicon Valley  

E-Print Network [OSTI]

SAVE THE DATE!!! The Silicon Valley 3rd Annual Social Innovation Leadership Forum 2014 (SILF 2014 towards a better tomorrow... Register for the event today! The Social Innovation Leadership Forum (SILF

Su, Xiao

312

Property:GEAReportDate | Open Energy Information  

Open Energy Info (EERE)

Pages using the property "GEAReportDate" Showing 1 page using this property. L Los Humeros III Geothermal Power Plant + 19 December 2013 + Retrieved from "http:en.openei.org...

313

Version Date: July 2012 COPYRIGHT & TRADEMARKS  

E-Print Network [OSTI]

WEB Clock Version Date: July 2012 #12;COPYRIGHT & TRADEMARKS Copyright © 1998, 2011, Oracle and Guide WEB Clock Page iii Table of Contents WEB Clock ........................................................................................................................ 1 WEB Clock Procedure

314

Categorical Exclusion Determination Form It Submit by E-_  

Broader source: Energy.gov (indexed) [DOE]

It Submit by E-_ It Submit by E-_ I'llail - ] Proposed Action Title: (0672- 1610) Eaton Corporation - Highly Efficient, Nea r-Isothermal Liquid-Piston Compressor fo r Low Cost At-Home Natural Gas Refueli ng Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Southfield, MI ; Eden Prairie, MN; Minneapolis, MN; and Milwaukee, WI Proposed Action Description: Funding will support efforts to develop a highly efficient, near isothermal liquid piston compressor for low cost, at-home natu ral gas refueling Proposed work will consist of: (1) develop and optimize a concept compressor design to achieve established performance and cost targets; (2) characterize and verify the expected performance for the compressor design; and (3) develop a compressor system prototype to test proof of

315

BESC Submits 32 Gene Disclosures for Patents | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Careers Work with ORNL About ORNL Visiting ORNL Events and Conferences Highlights Success Stories Contact Us Index Home | ORNL | Highlights SHARE BESC submits 32 gene disclosures for future patents July 01, 2012 Plant geneticist Wellington Muchero examines phenotypic traits of Populus transgenic lines grown in a greenhouse. The Bioenergy Science Center (BESC) at Oak Ridge National Laboratory (ORNL) is preparing invention disclosures for 32 different genes that can help improve the yield of ethanol from cellulosic biomass. These genes or their variants function to overcome recalcitrance-difficulty in breaking down cellulosic biomass to release sugars. Several members of ORNL's Biosciences Division are submitting disclosures: 16 genes by Wellington Muchero, 10 genes by Udaya Kalluri, and

316

Community Perceptions and Priorities for Managing Water and Environmental Resources in the River Njoro Watershed in Kenya  

E-Print Network [OSTI]

1 Community Perceptions and Priorities for Managing Water and Environmental Resources in the River-5 years, to demonstrate improved and integrated management of water and environmental resources poverty and enhancing livelihoods are important goals for water and environmental resources management

Richner, Heinz

317

A review of "Shifting Priorities: Gender and Genre in Seventeenth-Century Dutch Painting." by Nanette Salomon  

E-Print Network [OSTI]

of thought or nothingness, Colie found the paradox resolved in copiousness and pleni- tude. Nanette Salomon. Shifting Priorities: Gender and Genre in Seventeenth-Century Dutch Painting. Stanford: Stanford University Press, 2004. 163 pp. + 98 illus. $65...

Ellen Konowitz

2006-01-01T23:59:59.000Z

318

Draft Avian Conservation Plan for the Sierra Nevada Bioregion: Conservation priorities and strategies for safeguarding Sierra bird populations  

E-Print Network [OSTI]

and strategies for safeguarding Sierra bird populations A Project of California Partners in Flight and Institute priorities and strategies for safeguarding Sierra bird populations. Institute for Bird Populations report

DeSante, David F.

319

NO. REV. NO. Systems Division DATE  

E-Print Network [OSTI]

-~ NO. REV. NO. EATM-15 PAGE OF ~ Systems Division DATE EASEP /PSEP Solar Panel Development Design+"'--.:L'_;;;J....;::::::..··-=·~::!!:!!!e::...._ K. Hsi #12;NO. REV. NO. EATM-15 EASEP/PSEP Solar Panel Development ~ Systems Division Design of the EASE-PSEP Solar Panel Array~PA::G:,:E:..::=l=~o:F~=2=7= DATE 20 Nov. 1968 1. 0 SUMMARY Electrical power

Rathbun, Julie A.

320

Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

322

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

323

Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

324

Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

325

Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

326

Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

327

Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

328

Instructions for Submitting Documents to OpenNet  

Broader source: Energy.gov (indexed) [DOE]

Submitting Documents to OpenNet Submitting Documents to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. 1. Click on the LOGIN link on the top right. 2. Read the information and check the "I agree..." box. 3. Click on the "Request data submission access..." link at the bottom of the page. 4. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those listed,

329

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

notice914.jsp" notice914.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0205" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 05/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Burden: 3 hours" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"MONTHLY NATURAL GAS PRODUCTION REPORT",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2011.001" "FORM EIA-914" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this form, see the form instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction."

330

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

331

NTSF Spring 2012 Save The Date!  

Broader source: Energy.gov (indexed) [DOE]

15-17, 2012 - Mark your Calendar! 15-17, 2012 - Mark your Calendar! 2012 U.S. Department of Energy National Transportation Stakeholders Forum NTSF Website Please mark your calendar for May 15 thru 17 to attend the 2012 U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF). This year's Forum will be held at the Hilton Knoxville, which is located in the heart of the downtown business district in Knoxville, Tennessee. The 2012 Forum will follow last year's highly successful gathering in Denver, which involved the participation of states and tribes in addressing several key priorities. This year's Forum will continue to emphasize issues of importance and will feature an afternoon of discussion dedicated to Nuclear Regulatory Commission (NRC) topics of interest.

332

2014 NEJC Save the Date (Spanish) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2014 NEJC Save the Date (Spanish) 2014 NEJC Save the Date (Spanish) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

333

2014 NEJC Save the Date (English) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 NEJC Save the Date (English) 2014 NEJC Save the Date (English) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

334

The Chimalapas Region, Oaxaca, Mexico: a high-priority region for bird conservation in Mesoamerica  

E-Print Network [OSTI]

have been few (Binford 1989). Aside from occasional collecting by W. B. Richardson at the end of the nineteenth century (specimens principally at the British Museum), and intensive collecting in the mid-twentieth century near Sarabia and Matias Romero... scienti?c collections in North America and Europe (Peterson et al. 1998b). For Oaxaca east of Matias Figure 2. Vegetation types in the Selva Zoque priority region of the Chimalapas, Mexico. Data from http://www.conabio.gob.mx. The Chimalapas Region, Oaxaco...

Peterson, A. Townsend; Navarro-Sigü enza, Adolfo G.; Herná ndez-Bañ os, Blanca E.; Escalona-Segura, Griselda; Rebó n-Gallardo, Fanny; Rodrí guez-Ayala, Emir; Figueroa-Esquivel, Elsa M.; Cabrera-Garcí a, Leonardo

2003-01-01T23:59:59.000Z

335

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

faqfinaldecember-2010.pdf More Documents & Publications Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program DOE...

336

Presentations by Date | Merit Review Application  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

337

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

338

G3 students are to write a written progress report annually (suggested to be 2-3 pg in length), to be submitted to their advisor and their DAC, and used as the basis of a DAC committee meeting. This form acknowledges completion of  

E-Print Network [OSTI]

), to be submitted to their advisor and their DAC, and used as the basis of a DAC committee meeting. This form or plans; OR By presenting this form, I certify that my research Advisor and Chair of my DAC (ie, 2nd Signature / Date Dissertation Advisory Committee Members Advisor / First Reader (print

339

COS NUV TA1 Mirror Specification Date: December 8, 1999  

E-Print Network [OSTI]

Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling:........................................................................................ 3 3.4.3 Solvents

Colorado at Boulder, University of

340

COS NUV Grating Substrate Specification Date: August 20, 2001  

E-Print Network [OSTI]

Experiment Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling: ............................................................................................3 3.4.3 Solvents.........................................................................................................

Colorado at Boulder, University of

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

COS Coating Reflectivity Specification Date: August 2, 1999  

E-Print Network [OSTI]

Project Scientist, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center .................................................................................. 4 4.1.1 Solvents

Colorado at Boulder, University of

342

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

343

Computational Age Dating of Special Nuclear Materials  

SciTech Connect (OSTI)

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

344

Uniform Requirements for Manuscripts Submitted to Biomedical Journals  

Science Journals Connector (OSTI)

...Association, the Lancet, the Medical Journal of Australia, the New England Journal of Medicine, the New Zealand Medical Journal, the Tidsskrift for den Norske Laegeforening, the Western Journal of Medicine, and the Index Medicus. It is important to emphasize what these requirement do and do not imply. First... A small group of editors of general medical journals met informally in Vancouver, British Columbia, in 1978 to establish guidelines for the format of manuscripts submitted to their journals. The group became known as the Vancouver Group. Its requirements ...

International Committee of Medical Journal Editors

1997-01-23T23:59:59.000Z

345

Queen's University Environmental Health & Safety Date Issued  

E-Print Network [OSTI]

Queen's University Environmental Health & Safety Date Issued: November 27, 2013 Page No.: 1: The Department of Environmental Health & Safety 1.0 Introduction Queen's University acknowledges that the use of the Aboriginal culture and heritage. This standard operating procedure outlines the University's guidelines

Graham, Nick

346

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

347

2011 TRAINING DATES January 10-12  

E-Print Network [OSTI]

2011 TRAINING DATES January 10-12 March 1-3 April 11-13 June 7-9 July 26-28 September 6-8 November: Tools and Functionality Professional Development Training Course OVERVIEW ArcGIS Desktop II: Tools come- first serve basis. · The workshop registration cost is $650. Payment is due prior to the training

348

CURRICULUM VITAE DATE PREPARED: September 5, 2007  

E-Print Network [OSTI]

CURRICULUM VITAE DATE PREPARED: September 5, 2007 PART I: General Information Education 2000- Organization for Human Brain Mapping (OHBM), Member HMS Curriculum Vitae Page 1 of 14 #12;2005- Society for Neuroscience (SFN), Member HMS Curriculum Vitae Page 2 of 14 #12;Part II: Research, Teaching

Boas, David

349

SAVE THE DATE! Saskatchewan Epidemiology Association  

E-Print Network [OSTI]

SAVE THE DATE! Saskatchewan Epidemiology Association Annual Fall Symposium & Workshop November 9 look forward to presentations by: Saskatchewan's Chief Medical Health Officer, Dr. Moira Mc of Regina ­ expert in climate change on the prairies Saskatchewan-based veterinarian ­ name to be announced

Saskatchewan, University of

350

Date ______________________ New York City Fire Department  

E-Print Network [OSTI]

familiar with the fire protection and fire suppression systems in the premises where heDate ______________________ New York City Fire Department Bureau of Fire Prevention 9 Metro received training in 3RCNY §10-01, Fire Code Sections 2701 - 2703 & 2706, the New C-14 study material

Jia, Songtao

351

Lorem & Ipsum [Insert Date \\ Issue] EQUINEBOOSTERSOFMSU  

E-Print Network [OSTI]

] Check out the MSU Colt Starting Class on Facebook! Keep up to date on the progress of our students the know-how and the connections with buyers across the United States. Headwaters Livestock, located in Three Forks, MT holds cattle sales every Monday and horse sales as announced. Special feeder, stock cow

Dyer, Bill

352

Eliminating livelock by assigning the same priority state to each message that is inputted into a flushable routing system during N time intervals  

DOE Patents [OSTI]

Livelock-free message routing is provided in a network of interconnected nodes that is flushable in time T. An input message processor generates sequences of at least N time intervals, each of duration T. An input register provides for receiving and holding each input message, where the message is assigned a priority state p during an nth one of the N time intervals. At each of the network nodes a message processor reads the assigned priority state and awards priority to messages with priority state (p-1) during an nth time interval and to messages with priority state p during an (n+1) th time interval. The messages that are awarded priority are output on an output path toward the addressed output message processor. Thus, no message remains in the network for a time longer than T.

Faber, Vance (Los Alamos, NM)

1994-01-01T23:59:59.000Z

353

Date of Birth Declaration Office of the Registrar  

E-Print Network [OSTI]

that shows your birth date. (Examples: Driver's License, Birth Certificate, Passport, court or other legalDate of Birth Declaration Office of the Registrar http://registrar.wisc.edu OFFICE USE ONLY Date Date of Birth Month: Day: Year: By my signature, I hereby claim that my correct day of birth

Yavuz, Deniz

354

Submit Your Home Energy Efficiency Questions Now for Earth Day Google+  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Home Energy Efficiency Questions Now for Earth Day Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout April 2, 2013 - 10:40am Addthis Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs How can I participate? Submit a video question in advance. All you need to do is create a 30-second video, upload it to YouTube before April 16 and tag it with #askEnergy. Email your questions to newmedia@hq.doe.gov.

355

DATE: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH  

Broader source: Energy.gov (indexed) [DOE]

TO: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH 2005..19 March 1, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management STARS Conversion In April 2005, the Department will be converting to the new Standard Accounting and Reporting System (STARS). Department contractors and vendors will be encouraged to submit invoices early for goods or services to be delivered in March 2005 so they can be processed and paid by the end of the month. For such payment, invoices must be received by the Oak Ridge Financial Service Center not later than March 17,2005, and approving officials must provide their approvals by March 24,2005. Page 1 of2 To ensure a smooth transition, a one-time, limited delegation of Contracting Officer authority has been granted to the Director at Oak Ridge Financial Service Center for the purpose of signing

356

Program solicitation: Closing date, January 22, 1988  

SciTech Connect (OSTI)

DOE invites small business firms to submit proposals in this sixth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal R and D needs, increasing the commercial application of DOE-supported research results, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

Not Available

1987-01-01T23:59:59.000Z

357

Program solicitation. Closing date: March 1, 1995  

SciTech Connect (OSTI)

This document is a solicitation for small business to participate in innovation research. The Department of Energy (DOE) invites small business concerns to submit grant applications under this thirteenth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described in Appendix 1 are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include increasing private sector commercialization of technology developed through DOE-supported R and D, stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal research and R and D needs, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

Not Available

1995-01-01T23:59:59.000Z

358

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

359

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

360

Solar Thermochemical Hydrogen Production Research (STCH): Thermochemical Cycle Selection and Investment Priority  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-3622 1-3622 Unlimited Release Printed May 2011 Solar Thermochemical Hydrogen Production Research (STCH) Thermochemical Cycle Selection and Investment Priority Robert Perret Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Approved for public release; further dissemination unlimited. 2 Issued by Sandia National Laboratories, operated for the United States Department of Energy by Sandia Corporation. NOTICE: This report was prepared as an account of work sponsored by an agency of the

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A dynamic priority based path planning for cooperation of multiple mobile robots in formation forming  

Science Journals Connector (OSTI)

Abstract Robots that work in a proper formation show several advantages compared to a single complex robot, such as a reduced cost, robustness, efficiency and improved performance. Existing researches focused on the method of keeping the formation shape during the motion, but usually neglect collision constraints or assume a simplified model of obstacles. This paper investigates the path planning of forming a target robot formation in a clutter environment containing unknown obstacles. The contribution lies in proposing an efficient path planner for the multiple mobile robots to achieve their goals through the clutter environment and developing a dynamic priority strategy for cooperation of robots in forming the target formation. A multirobot system is set up to verify the proposed method of robot path planning. Simulations and experiments results demonstrate that the proposed method can successfully address the collision avoidance problem as well as the formation forming problem.

Shuang Liu; Dong Sun; Changan Zhu

2014-01-01T23:59:59.000Z

362

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

363

Research Highlights Sorted by Submission Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

364

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

365

Evaluation of the commercial FBR introduction date  

SciTech Connect (OSTI)

This report examines one criterion for introducing a commercial FBR: economic competitiveness with a Light Water Reactor (LWR). For this analysis, the commercial FBR is assumed to be the fifth-of-a kind replicate which represents an economically mature plant. This FBR is deemed economically competitive when its life-cycle energy cost is less than or equal to that of an LWR. Results of this analysis are used in a comparative analysis of alternative FBR development stategies. The strategies evaluated in these studies assume both 1000- and 1457-MWe FBRs. Since the capital costs per kilowatt, and therefore the energy costs, for these two FBR sizes are different, they will become economically competitive at different times. The probability density function for the 1457-MW(e) FBR has an expected value date or weighted average date of 2030, compared with 2033 for the probability density function for the 1000-MW(e) FBR.

White, M.K.; Merrill, E.T.

1981-09-01T23:59:59.000Z

366

Application of dating for searching geothermic sources  

Science Journals Connector (OSTI)

A Geothermical field is usually associated with a volcanic region and, therefore, with an abundance of volcanic glasses such as obsidians. The magmatic chambers constitute an excellent source of heat for a geothermical system. These chambers can be geologically identified from the surface by its recent volcanic products. Therefore, the geological age of the volcanic units is of great interest for a location of a worthwile thermal energy field. This paper presents some preliminary results of the ages obtained by dating obsidians.

L. Gutirrez-Negrin; A. Lpez-Martnez; M. Balczar-Garca

1984-01-01T23:59:59.000Z

367

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE  

E-Print Network [OSTI]

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE PAYROLL DOCUMENTS AND CITIZENSHIP STATUS FORM Permanent Resident Resident Alien Card, or I-551 Stamped

Adali, Tulay

368

FALSIFICATION OF INFORMATION POLICY Students registering and submitting resumes on MySpartanCareer.com certify  

E-Print Network [OSTI]

FALSIFICATION OF INFORMATION POLICY Students registering and submitting resumes on My in your MySpartanCareer.com profile, resume, or other application materials, MSU Career Services

Liu, Taosheng

369

NASA Research Areas of Interest NASA EPSCoR research priorities are defined by the Mission Directorates (Aeronautics Research,  

E-Print Network [OSTI]

NASA Research Areas of Interest NASA EPSCoR research priorities are defined by the Mission area of the Agency's research and technology development efforts. Information about current NASA: http://www.aeronautics.nasa.gov/programs.htm Research Opportunities in Aeronautics (ROA) http

Maxwell, Bruce D.

370

Systematic Analysis of Priority Water Resources Problems to Develop a Comprehensive Research Program for the Southern Plains River Basins Region  

E-Print Network [OSTI]

TR- 61 1975 Systematic Analysis of Priority Water Resources Problems to Develop a Comprehensive Research Program for the Southern Plains River Basins Region R.E. Babcock J.W. Clark E.J. Dantin M.T. Edmison N.A. Evans...

Babcock, R. E.; Clark, J. W.; Dantin, E. J.; Edmison, M. T.; Evans, N. A.; Power, W. L.; Runkles, J. L.

371

Interventions to improve recruitment and retention in clinical trials: a survey and workshop to assess current practice and future priorities  

Science Journals Connector (OSTI)

Recruitment and retention in clinical trials is still a major challenge and are of high priority for many Clinical Trials Units. Using survey and workshop data, methods used to encourage recruitment and retention were categorised and the authors highlighted areas for prioritising further methodological research.

Peter Bower; Valerie Brueton; Carrol Gamble; Shaun Treweek; Catrin Smith; Bridget Young; Paula Williamson

2014-10-16T23:59:59.000Z

372

HSPD-12 Implementation Status Report Updated Date:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

373

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012)  

E-Print Network [OSTI]

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012) 1 THE SG2-00725987,version1-16Oct2012 Author manuscript, published in "Solar Energy 88, 10 (2012) Pages 3072-3083" DOI : 10.1016/j.solener.2012.07.018 #12;Submitted to Solar Energy (Nov. 2011) Complete article

Paris-Sud XI, Université de

374

Incident Report An incident report should be submitted for any event involving  

E-Print Network [OSTI]

Incident Report An incident report should be submitted for any event involving: injury or illness fire explosion or implosion chemical exposure Minor cuts and scrapes need not be reported be reported. If a "near miss" might have had severe consequences, submit an incident report. You may also

Crawford, T. Daniel

375

Submitted for Publication to SOLAR ENERGY PRODUCING SATELLITE-DERIVED IRRADIANCES IN COMPLEX ARID TERRAIN  

E-Print Network [OSTI]

Submitted for Publication to SOLAR ENERGY PRODUCING SATELLITE-DERIVED IRRADIANCES IN COMPLEX ARID spectrum. #12;Submitted for Publication to SOLAR ENERGY In its simplest description the model amounts wavelengths in the visible spectral range (0.55-0.75 µm) corresponding to the peak of the solar radiation

Perez, Richard R.

376

How to Submit a Privacy Act Request | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to Submit a Privacy Act Request How to Submit a Privacy Act Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Compilation of Systems of Records Energy Employees Occupational Illness Compensation Program Act (EEOICPA) How to Submit a Privacy Act Request Privacy Act Request Form .pdf file (99KB) Reference Links Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Privacy Act How to Submit a Privacy Act Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Privacy Act Request Form .pdf file (99KB) You may request your own Privacy Act records by submitting a request in

377

EIS-0396: Notice of Extension of Time to Submit Scoping Comments |  

Broader source: Energy.gov (indexed) [DOE]

Extension of Time to Submit Scoping Comments Extension of Time to Submit Scoping Comments EIS-0396: Notice of Extension of Time to Submit Scoping Comments Global Nuclear Energy Partnership In response to public requests, the Department of Energy (DOE) announces an extension of time to submit comments on the proposed scope, alternatives, and environmental issues to be analyzed in the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership (GNEP PEIS). Notice of Extension of Time to Submit Scoping Comments on the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership, DOE/EIS-0396 (April 2007) 72 FR 15871 More Documents & Publications EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis

378

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator  

E-Print Network [OSTI]

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator Amy Irish. This moderate to heavy crop will mature close predicted dates. Blocks with light croploads will mature 3 or 4

379

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

380

AHAM- CCE Overview and Update, dated 06/07/2011  

Broader source: Energy.gov [DOE]

This document is U.S. Department of Energy's presentation titled "AHAM - CCE Overview and Update", dated June 7, 2011.

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

2012 -2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network [OSTI]

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2012 - 2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

382

2013 -2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network [OSTI]

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2013 - 2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

383

Student ID Number Date of birth Cell Phone  

E-Print Network [OSTI]

Name Student ID Number Date of birth Cell Phone New Housing Student Current Housing Student All's phone Crime 2 Information about charges or crime convicted of Date of conviction Court convicted in Sentence received Probation dates Probation officer's name Probation officer's phone Consent: I authorize

Pantaleone, Jim

384

Title/Loc/Date: Slide # 1 Jo EllisMonaghan  

E-Print Network [OSTI]

Title/Loc/Date: Slide # 1 Jo Ellis­Monaghan e­mail: joellis@emba.uvm.edu website: http://academics.smcvt.edu/jellis­monaghan #12; Title/Loc/Date: Slide # 2 29(59,(:# . First some problems (network reliability, scheduling; Title/Loc/Date: Slide # 3 6RPH#3UHOLPLQDULHV# # 'HOHWLRQ

Ellis-Monaghan, Joanna

385

The US Support Program to IAEA Safeguards Priority of Training and Human Resources  

SciTech Connect (OSTI)

The U.S. Support Program to IAEA Safeguards (USSP) priority of training and human resources is aimed at providing the Department of Safeguards with an appropriate mixture of regular staff and extrabudgetary experts who are qualified to meet the IAEA's technical needs and to provide personnel with appropriate instruction to improve the technical basis and specific skills needed to perform their job functions. The equipment and methods used in inspection activities are unique, complex, and evolving. New and experienced safeguards inspectors need timely and effective training to perform required tasks and to learn new skills prescribed by new safeguards policies or agreements. The role of the inspector has changed from that of strictly an accountant to include that of a detective. New safeguards procedures are being instituted, and therefore, experienced inspectors must be educated on these new procedures. The USSP also recognizes the need for training safeguards support staff, particularly those who maintain and service safeguards equipment (SGTS), and those who perform information collection and analysis (SGIM). The USSP is committed to supporting the IAEA with training to ensure the effectiveness of all staff members and will continue to offer its assistance in the development and delivery of basic, refresher, and advanced training courses. This paper will discuss the USSP ongoing support in the area of training and IAEA staffing.

Queirolo,A.

2008-06-13T23:59:59.000Z

386

Multiple failure modes analysis and weighted risk priority number evaluation in FMEA  

Science Journals Connector (OSTI)

Traditionally, failure mode and effects analysis (FMEA) only considers the impact of single failure on the system. For large and complex systems, since multiple failures of components exist, assessing multiple failure modes with all possible combinations is impractical. Pickard et al. [1] introduced a useful method to simultaneously analyze multiple failures for complex systems. However, they did not indicate which failures need to be considered and how to combine them appropriately. This paper extends Pickards work by proposing a minimum cut set based method for assessing the impact of multiple failure modes. In addition, traditional FMEA is made by addressing problems in an order from the biggest risk priority number (RPN) to the smallest ones. However, one disadvantage of this approach is that it ignores the fact that three factors (Severity (S), Occurrence (O), Detection (D)) (S, O, D) have the different weights in system rather than equality. For examples, reasonable weights for factors S, O are higher than the weight of D for some non-repairable systems. In this paper, we extended the definition of RPN by multiplying it with a weight parameter, which characterize the importance of the failure causes within the system. Finally, the effectiveness of the method is demonstrated with numerical examples.

Ningcong Xiao; Hong-Zhong Huang; Yanfeng Li; Liping He; Tongdan Jin

2011-01-01T23:59:59.000Z

387

The US Support Program to IAEA Safeguards Priority of Containment and Surveillance  

SciTech Connect (OSTI)

The United States Support Program (USSP) priority for containment and surveillance (US) focuses on maintaining or improving the reliability and cost-effectiveness of C/S systems for IAEA safeguards, expanding the number of systems that are unattended and remotely monitored, and developing verification methods that help streamline the on-site inspection process. Existing IAEA C/S systems have evolved to become complex, integrated systems, which may include active seals, nondestructive assay (NDA) instruments, video cameras, and other sensors. These systems operate autonomously. They send analytical data to IAEA headquarters where it can be reviewed. These systems present challenges to the goals of improved system performance, standardization, reliability, maintainability, documentation, and cost effectiveness. One critical lesson from past experiences is the need for cooperation and common objectives among the IAEA, the developer, and the facility operator, to create a successful, cost effective system. Recent USSP C/S activities include Rokkasho Reprocessing Plant safeguard systems, production of a new shift register, numerous vulnerability assessments of C/S systems, a conduit monitoring system which identifies tampering of IAEA conduit deployed in the field, fiber optic seal upgrades, unattended monitoring system software upgrades, next generation surveillance system which will upgrade existing camera systems, and support of the IAEA's development of the universal nondestructive assay data acquisition platform.

Diaz,R.A.

2008-06-13T23:59:59.000Z

388

Conference Proceedings, 2011 Low Impact Development Symposium, Submitted, March 2012 Economic and Adaptation Benefits of Low Impact Development  

E-Print Network [OSTI]

Conference Proceedings, 2011 Low Impact Development Symposium, Submitted, March 2012 1 Economic.ballestero@unh.edu; web: www.unh.edu/unhsc/. #12;Conference Proceedings, 2011 Low Impact Development Symposium, Submitted

389

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

390

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

391

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

392

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

393

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

394

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

395

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

396

DOE-EA-1184 Date Prepared:  

Broader source: Energy.gov (indexed) [DOE]

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

397

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

398

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

399

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

400

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

R&D priorities in the field of sustainable remediation and purification of agro-industrial and municipal wastewater  

Science Journals Connector (OSTI)

Abstract This article was presented as a position paper during the Environmental Biotechnology and Microbiology Conference in Bologna, Italy in April 2012. It indicates major and emerging environmental biotechnology research and development (R&D) priorities for EU members in the field of sustainable remediation and purification of agro-industrial and municipal wastewater. The identified priorities are: anaerobic/aerobic microbial treatment, combination of photochemical and biological treatment, phytoremediation and algae-based remediation, as well as innovative technologies currently investigated, such as enzyme-based treatment, bioelectrochemical treatment and recovery of nutrients and reuse of cleaned water. State of the art, research needs and prospective development in these domains are crucially discussed. As a result, goals of the future development of bioremediation and purification processes are defined and the way to achieve them is proposed.

Korneliusz Miksch; Grzegorz Cema; Philippe F.-X. Corvini; Ewa Felis; Adam Sochacki; Joanna Surmacz-Grska; Jaros?aw Wiszniowski; Sebastian ?abczynski

2015-01-01T23:59:59.000Z

402

Manuscript Submitted to Solar Energy 4/2002 A NEW OPERATIONAL SATELLITE-TO-IRRADIANCE MODEL DESCRIPTION AND VALIDATION  

E-Print Network [OSTI]

Manuscript Submitted to Solar Energy 4/2002 A NEW OPERATIONAL SATELLITE-TO-IRRADIANCE MODEL, OR, USA #12;Manuscript Submitted to Solar Energy 4/2002 ABSTRACT We present a new simple model zenith angle to account for first order solar #12;Manuscript Submitted to Solar Energy 4/2002 geometry

Perez, Richard R.

403

Submitted to the Journal of Nanoscience and Nanotechnology, 2001. Effects of Nanometer Thick Passivation Layers on the  

E-Print Network [OSTI]

Submitted to the Journal of Nanoscience and Nanotechnology, 2001. Effects of Nanometer Thick concerned with the #12;Submitted to the Journal of Nanoscience and Nanotechnology, 2001. fact that devices. These effects all give rise to stresses in the #12;Submitted to the Journal of Nanoscience and Nanotechnology

Espinosa, Horacio D.

404

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing sample, cover letter and three references  

E-Print Network [OSTI]

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing://merkley.senate.gov/services/internships/ To apply: submit cover letter, resume, writing sample (://wyden.senate.gov/constituents/internship.cfm To apply: submit cover letter, resume and application (available online) David Wu (OR-1) Application

Escher, Christine

405

Research priorities in land use and land-cover change for the Earth system and integrated assessment modelling  

E-Print Network [OSTI]

). Copyright ? 2010 Royal Meteorological Society and Crown Copyright. KEY WORDS land use; land cover; Earth system models; integrated assessment models; research priorities Received 12 January 2009; Revised 9 March 2010; Accepted 14 March 2010 1. Introduction 1... biogeophysical, socio- economic and human decision-making perspectives. The Earth System Modeling (ESM) and the Integrated Assessment Modeling (IAM) communities play an impor- tant role in understanding and quantifying Earth system analysis and, specifically...

Hibbard, Kathy; Janetos, Anthony; van Vuuren, Detlef P.; Pongtatz, Julia; Rose, Steven K.; Betts, Richard; Herold, Martin; Feddema, Johannes J.

2010-01-01T23:59:59.000Z

406

POSTING DATE: 12/14/2012 REMOVAL DATE: 12/24/2012 An application or resume must be submitted on line for each position applied for, through the COLT Promotional Opportunities  

E-Print Network [OSTI]

TECHNICIAN R 16 $40122- 54568 SAS-DLS-Cell & DNA Repository, Busch Non-State funded. Under general guidance's degree in a scientific discipline. A combination of two years college-level science curriculum plus two in an appropriate science curriculum may be substituted for the experience in the above combination. Requires

Hanson, Stephen José

407

POSTING DATE: 08/23/2013 REMOVAL DATE: 09/03/2013 An application or resume must be submitted on line for each position applied for, through the COLT Promotional Opportunities  

E-Print Network [OSTI]

-002227 SECRETARIAL ASST III R 15 $38414- 52128 Housing Opers - Residence Life, Cook Non-State funded. Provides confidential and coordinating secretarial/clerical support and renders basic administrative staff assistance) Four years secretarial experience; b) One year college level study plus three years of any equivalent

Hanson, Stephen José

408

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" 5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0174" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 12/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2013.01" "FORM EIA-782A" "REFINERS'/GAS PLANT OPERATORS' MONTHLY PETROLEUM PRODUCT SALES REPORT" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. See Instructions for further details on the sanctions and the provisions concerning the confidentiality of information submitted on this form."

409

Kansas City Plant submits productivity savings under share-in-savings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kansas City Plant submits productivity savings under share-in-savings Kansas City Plant submits productivity savings under share-in-savings program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Kansas City Plant submits productivity savings under ... Kansas City Plant submits productivity savings under share-in-savings program Posted By Gayle Fisher

410

Department of Energy Submits $23.6 Billion Spending Plan to Congress for  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Submits $23.6 Billion Spending Plan to Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 March 16, 2007 - 10:55am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) today submitted the Department's $23.598 billion spending plan to Congress for Fiscal Year (FY) 2007, a $45 million (0.2%) increase over the FY'07 request, as a result of the FY'07 Continuing Resolution. The spending plan will allow DOE to continue making marked progress in achieving President Bush's goal of bringing more clean energy sources to market to help cut dependence on fossil fuels, increasing our energy and economic security and boosting competitiveness. The Continuing Resolution, signed by President Bush on

411

Preparing and Submitting a Phase I Letter of Intent | U.S. DOE Office of  

Office of Science (SC) Website

and Submitting a Phase I Letter of Intent and Submitting a Phase I Letter of Intent Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent Preparing a DOE SBIR/STTR Phase I Grant Application Useful Documents for Awardees Commercialization Assistance Other Resources Awards SBIR/STTR Highlights Reporting Fraud Contact Information Small Business Innovation Research and Small Business Technology Transfer U.S. Department of Energy SC-29/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-5707 F: (301) 903-5488 E: sbir-sttr@science.doe.gov More Information » Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent

412

Attachment to Policy Flash on New Procedures for Submitting Clause or Template Changes  

Broader source: Energy.gov (indexed) [DOE]

on New Procedures for Submitting Clause or Template on New Procedures for Submitting Clause or Template Changes The following are the new procedures for submitting requests to add new clauses or templates or to change existing clauses and templates (including local clauses and templates) in STRIPES: Note that we are not specifying a specific number of days for any step in the process until we have some statistics on how long this new process will take. ∗ Site Points of Contact (SPOCs) and Contract and Financial Assistance Policy Division (CFAPD) staff are the only individuals who can submit a request for a clause or template addition or revision to the STRIPES functional team. Requests from other than the SPOCs will not be reviewed. ∗ The new forms developed for the requests for clause and template additions or revisions

413

How to Submit a FOIA Request | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to Submit a FOIA Request How to Submit a FOIA Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request FOIA Request Form Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) How to Submit a FOIA Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Electronic FOIA Request Form Office of Science Integrated Support Center (ISC)

414

Solution to Submit Large Electronic Proposal Files Principal Investigator and Departmental Staff Procedures  

E-Print Network [OSTI]

Procedures Sponsored Projects Administration (SPA) now has a solution for large electronic proposal files Submission folder. They can only upload files. 9. Follow the normal procedures to advise SPA to submit the sponsor's procedures. #12;

Janssen, Michel

415

Academic Advisor Appeal Questionnaire To be submitted as part of Financial Aid Appeal Process  

E-Print Network [OSTI]

Academic Advisor Appeal Questionnaire To be submitted as part of Financial Aid Appeal Process: ________________________________________ THE FOLLOWING IS TO BE COMPLETED BY THE ACADEMIC ADVISOR PRIOR TO FINANCIAL AID APPEAL MEETING Advisor Name: __________________________________ Department: __________________________________ Advisor Telephone: ______________________________ Advisor E

416

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network [OSTI]

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

417

Radiation Exposure Monitoring Systems Program Policy for Submitting of PII information  

Broader source: Energy.gov [DOE]

The REMS Program Policy for submitting of PII information in accordance with the Office of Environment, Health, Safety and Security (EHSS) under DOE Order 231.1B and the REMS Reporting Guide.

418

Safety Shoe and Insole Reimbursement Form Requisitioner: -Submit to supervisor for signature  

E-Print Network [OSTI]

Safety Shoe and Insole Reimbursement Form Requisitioner: - Submit to supervisor for signature. _________________________________________________ POSITION ____________________________________________________________________ DID YOU PURCHASE SAFETY TOES Safety Shoes or other footwear under the provisions outlined in the Collective Agreement

Sinnamon, Gordon J.

419

Advanced Powertrain Research Facility Document Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

420

Advanced Powertrain Research Facility Document Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Commitcoin: Carbon dating commitments with bitcoin  

E-Print Network [OSTI]

Abstract. In the standard definition of a commitment scheme, the sender commits to a message and immediately sends the commitment to the recipient interested in it. However the sender may not always know at the time of commitment who will become interested in verifying it. Further, when the interested party does emerge, it could be critical to establish when the commitment was made. Employing a proof of work protocol at commitment time will later allow anyone to carbon date when the commitment was made, approximately, without trusting any external parties. We present CommitCoin, an instantiation of this approach that harnesses the existing processing power of the Bitcoin peer-to-peer network; a network used to mint and trade digital cash. 1 Introductory Remarks Consider the scenario where Alice makes an important discovery. It is important to her that she receives recognition for her breakthrough, however she would also like to keep it a secret until she can establish a suitable infrastructure for monetizing it. By forgoing publication of her discovery, she risks Bob independently making the same discovery and publicizing it as his own. Folklore suggests that Alice might mail herself a copy of her discovery and leave the letter sealed, with the postal services timestamp intact, for a later resolution time. If Bob later claims the same discovery, the

Jeremy Clark; Er Essex

422

December 4, 2008; HSS/Union Working Group Meeting on 2008 HSS/Union Topical Wrap Up - Union Lead Action Priorities  

Broader source: Energy.gov (indexed) [DOE]

TOPICAL LEAD PRIORITY ACTION SUBMITTALS FOR TOPICAL LEAD PRIORITY ACTION SUBMITTALS FOR DECEMBER 4 HSS/UNION TOPICAL WRAP UP MEETING SMWIA Submittal of Action Priorities: The priorities below reflect SMWIA/training subcommittee input for moving forward in 2009 and beyond. 1. A pre-requisite requirement of OSHA-10 Hour Training for workers to gain access to DOE sites 2. Standardized training requirements across the DOE network of facilities supported by the NIEHS model for support for all building trades and sub crafts 3. Support for the 851 requirements as an onsite delivery training initiative or pre- work requirement 4. Utilization of the HAMMER model for hands on training with peer group instructors in local training facilities or HAMMER, and recognize and utilize virtual...CBT/web-based training component(s) when applicable.

423

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

424

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

425

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

426

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

427

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

428

EV Project Overview Report - Project to Date through December...  

Broader source: Energy.gov (indexed) [DOE]

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

429

SAVE THE DATE - 2015 National Environmental Justice Conference...  

Broader source: Energy.gov (indexed) [DOE]

Documents & Publications 2014 NEJC Save the Date (English) ITP Aluminum: Technical Working Group on Inert Anode Technologies Leadership Transition Program (LTP) Application Package...

430

PRINCIPAL INVESTIGATOR Last Name First Name Date Institution  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Funding Source Research Proprietary Non-proprietary (publication in open source or peer review journal expected) Objectives: Abstract: SCHEDULING Expected start date for...

431

Exploitation of geothermal energy as a priority of sustainable energetic development in Serbia  

Science Journals Connector (OSTI)

The actual global economic crisis, including all other well-known problems of sustainable development, reflects the direction of development of all countries in the world. Serbia, as a European country in its early stage of development, is trying to synchronize its progress with experience of other countries from the field of sustainable development and in accordance with rules in the field of energetic and energetic efficiency, and, as well as to promote and develop the sector of use of renewable sources of energy. On the other hand, Serbia is a country which largely depends on import of all forms of energy, which to a great extent affects its economic stability. Therefore, in Serbia the strategy for development of energetic was imposed and it considers all the aspects of development of energetic until 2015 and it also defines the priorities which can be mostly seen in the choice of forms of alternative sources of energy. These sources, based on some criteria, can be considered the most convenient for a gradual substitution of energy which is gotten from the conventional sources. Taking into account strategically defined goals and domestic potentials which are at disposal, as well as economic parameters, an alternative source of energy of basic importance for the future exploitation on the territory of Serbia geothermal energy, was chosen. The research points to the fact that Serbia will be capable to respond adequately to Kyoto protocol demands and to the European rules regarding the substitution of a certain amounts of fossil fuels by the fuel origin from the raw biological materials. The research defines the existent and non-existent capacities and the assessment of positive effects of usage of geothermal energy. At the moment, 160 long holes are being exploited whose water temperature is around 60C (140F) and their heat power reach 160MJ/s. It was stated that adequate exploitation of existing and new geothermal sources a yearly would save about 500,000tons of fossil fuels what is proportional to the 10% of the today's heating system. The total amount of heat accumulated at geothermal deposit sites in Serbia, up to 3km of depth, is two times greater than the total amount of heat that may be generated by burring all available coal reserves in Serbia. Price of electrical energy produced from geothermal springs is estimated to be between 9.2UScents/kWh and 11.5UScents/kWh. In order to support exploitation of geothermal energy (as well as all other renewable sources of energy) the decision that all the producers of energy from renewable sources get a status of privileged producers were made.

Mirjana Golusin; Olja Munitlak Ivanovic; Ivan Bagaric; Sanja Vranjes

2010-01-01T23:59:59.000Z

432

Preparing to Submit a License Application for Yucca Mountain  

SciTech Connect (OSTI)

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

433

Revision Level: 03 Revision Date: 10/21/13  

E-Print Network [OSTI]

required for all collector types. However, the form is generic in nature so many fields will not apply to your particular collector. Therefore not all fields in this application will be filled out. Where): The information submitted with this application has been reviewed by me and is true and correct to the best of my

434

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification Archery

Williams, Gary A.

435

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of 0 (no knowledge) to 3_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Grether, Gregory

436

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Williams, Gary A.

437

Computer Engineering Graduate Handbook Dated: February 06, 2014  

E-Print Network [OSTI]

Computer Engineering Graduate Handbook Dated: February 06, 2014 MASTER OF SCIENCE IN COMPUTER ENGINEERING Computer Engineering Program College of Engineering & Computer Science California State University-278-5987 Fax: 657-278-5804 http://www.fullerton.edu/ecs/cpe #12;Computer Engineering Graduate Handbook Dated

de Lijser, Peter

438

Form Date 4/4/01 Refrigerant Service Order Form  

E-Print Network [OSTI]

Recovery Unit ID # : Added Lbs oz Lbs oz Lbs oz Startup Charge Net Refrigerant Added: Lbs oz Parts UsedForm Date 4/4/01 Refrigerant Service Order Form Service ID: Owner: Work Order #: Building: Date: Issued: Completed: Equipment ID: Technicians: Location: Model: Manufact: Serial #: Refrigerant Type

Russell, Lynn

439

Revision Date 01.11.13 PROCUREMENT SERVICES -LOGISTICS  

E-Print Network [OSTI]

Revision Date 01.11.13 PROCUREMENT SERVICES - LOGISTICS Reading and Reconciling an ePro and MMD with your FACSID. Prerequisites: None Find Help: Email logistics_team@unc.edu #12;Procurement Services - Logistics Reading and Reconciling an ePro and MMD Statement Revision Date 01.11.13 Page 2 of 6 Departmental

Crews, Stephen

440

LSPE SAFE/ ARM SLIDE DATE 28 March 197  

E-Print Network [OSTI]

: ..'; I ~ ··,~ ' . LSPE SAFE/ ARM SLIDE NO. ATM-1088 REV. NO. PAGE OF- DATE 28 March 197 FAILURE/ ARM SLIDE FAILURE EVALUATION REPORT TABLE OF CONTENTS PURPOSE BACKGROUND DESCRIPTION OF FAILURE with Slides Having PAGI i DATE 0, Page 1 1 3 3 3 12 15 16 Larger Fillet Radius 16 6. 2 Slide Tests With 10

Rathbun, Julie A.

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Dating Pleistocene Archeological Sites by Protein Diagenesis in Ostrich Eggshell  

Science Journals Connector (OSTI)

...loss than bone but were still depleted by 60% when the epimerization...I ratios and radiocarbon or uranium-series dates from each site...and A. J. T. Tull; and uranium-series dates were provided...Institute, National Institutes of Health, Bethesda, MD 20892. H...

A. S. Brooks; P. E. Hare; J. E. Kokis; G. H. Miller; R. D. Ernst; F. Wendorf

1990-04-06T23:59:59.000Z

442

An early date for cattle from Namaqualand, South Africa  

E-Print Network [OSTI]

An early date for cattle from Namaqualand, South Africa: implications for the origins of herding did cattle come to South Africa? Radiocarbon dates on a newly found cow horn indicates a time, the authors favour immigrants moving along a western route through Namibia. Keywords: South Africa

443

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

444

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network [OSTI]

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration operating pressure (MOP) 5. De-humidifying (Te control) 6. Defrost funtions 7. Loss of charge detection (LOC control) 6. Defrost funtions 7. Loss of charge detection (LOC) 8. Bleed function 9. Sensor placement tips

Oak Ridge National Laboratory

445

Radioactive Waste Management - A Priority Thematic Area Within The Euratom 6th Framework Programme (2002-2006)  

SciTech Connect (OSTI)

The European Union's Sixth Framework Programme for Research and Technological Development and the specific EURATOM Framework Programme for Research and Training in Nuclear Energy (2002-2006)-EURATOM FP6--are the major building blocks for the European Commission to strengthen the foundations of the European Research Area, an open market for knowledge and science in Europe. The absence of a broadly agreed approach for radioactive waste management and disposal in the European Union caused the European Commission to raise the issue to a priority key area of research and development within EURATOM FP6. The sub-programme is aimed at looking to a widely agreed approach to waste disposal and will explore also the technical and economic potential of concepts for nuclear energy generation able to make better use of fissile material and generate less waste. To achieve these goals, participating research institutions are invited to invest in durable and structured partnerships by implementing ''new instruments'' for projects--Integrated Projects and Network of Excellence. In 2002 the European Commission consulted the research community on its readiness to prepare actions that use these ''new instruments'' for research topics in the priority area ''management of radioactive waste'' to assist in preparation of the work programme 2002-2006 of the EURATOM FP6. In parallel and under the last call for proposals of EURATOM FP5 the Commission launched two topic-related ''Thematic Networks'' that are bringing European research forces together and will create potential interest for future development within FP6.

Raynal, M.; von Maravic, H.

2003-02-24T23:59:59.000Z

446

International initiative to engage Iraq's science and technology community : report on the priorities of the Iraqi science and technology community.  

SciTech Connect (OSTI)

This report describes the findings of the effort initiated by the Arab Science and Technology Foundation and the Cooperative Monitoring Center at Sandia National Laboratories to identify, contact, and engage members of the Iraqi science and technology (S&T) community. The initiative is divided into three phases. The first phase, the survey of the Iraqi scientific community, shed light on the most significant current needs in the fields of science and technology in Iraq. Findings from the first phase will lay the groundwork for the second phase that includes the organization of a workshop to bring international support for the initiative, and simultaneously decides on an implementation mechanism. Phase three involves the execution of outcomes of the report as established in the workshop. During Phase 1 the survey team conducted a series of trips to Iraq during which they had contact with nearly 200 scientists from all sections of the country, representing all major Iraqi S&T specialties. As a result of these contacts, the survey team obtained over 450 project ideas from Iraqi researchers. These projects were revised and analyzed to identify priorities and crucial needs. After refinement, the result is approximately 170 project ideas that have been categorized according to their suitability for (1) developing joint research projects with international partners, (2) engaging Iraqi scientists in solving local problems, and (3) developing new business opportunities. They have also been ranked as to high, medium, or low priority.

Littlefield, Adriane C.; Munir, Ammar M. (Arab Science and Technology Foundation, Sharjah, United Arab Emirates); Alnajjar, Abdalla Abdelaziz (Arab Science and Technology Foundation, Sharjah, United Arab Emirates); Pregenzer, Arian Leigh

2004-05-01T23:59:59.000Z

447

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

448

Suggested Format for Submitting Frequency Data Requests to the Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Suggested Format for Submitting Frequency Data Requests to the Department of Energy Suggested Format for Submitting Frequency Data Requests to the Department of Energy This document provides a suggested format for 1710 - 1755 MHz wireless industry licensees to submit their data requests to the Department of Energy (DOE). Wireless licensees may use alternate formats, but should ensure that they indicate which DOE frequency assignments are being addressed by identifying the National Telecommunications and Information Administration (NTIA) Government Master File (GMS) Agency Serial Number. This is a unique identifier for each frequency assignment and will be in the format "DOE xxxxxx" where the "x's" will be numbers. XYZ Wireless Company requests the release of technical performance data related to the

449

How to Submit a Request for a PARS II Account | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account The account access process for PARS II relies on the Department of Energy's MIS Application Gateway system to verify the requestor's identity and to approve his/her request for access to a specific DOE Headquarters application, such as PARS II. Once approved by the MIS Application Gateway, the PARS II Help Desk Administrator will assign a new PARS II account to the requestor. Please follow the steps listed below to apply for a PARS II account. 1. If the federal employee or contractor does not already have an account with the Department of Energy's MIS Application Gateway, then the requestor must apply for an account and be approved by a local federal sponsor. To

450

Submitting the Report Deliverable via E-Link | Scientific and Technical  

Office of Scientific and Technical Information (OSTI)

Basics » DOE Reporting Requirements Basics » DOE Reporting Requirements Submitting the Report Deliverable via E-Link Print page Print page Email page Email page DOE Financial Assistance Recipients and Non-Major Site/Facility Management Contractor should use the AN 241.3 to submit scientific/technical reports electronically. No username or password is needed to submit the AN 241.3 or report deliverable. DOE awardees complete the web form AN 241.3 with just a few required pieces of information as indicated on the form in red font preceded by an asterisk. Instructions are linked at the top of the AN 241.3 and also at the data field level for each field. Set the browser to accept all cookies before starting the submission process. Be sure to input the DOE contract number accurately. Do not enter

451

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined  

Broader source: Energy.gov (indexed) [DOE]

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC November 28, 2007 - 4:45pm Addthis RICHMOND, VA - The U.S. Department of Energy (DOE) Assistant Secretary for Nuclear Energy Dennis Spurgeon today commended Dominion North Anna, LLC (Dominion) for submission of a combined Construction and Operating License (COL) application to the Nuclear Regulatory Commission (NRC) for construction of a new nuclear power plant in the United States. Dominion's application seeks approval to build and operate one General Electric-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) at its

452

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE July 6, 2010 - 3:08pm Addthis WASHINGTON, DC - The Department of Energy announced today that AeroSys, Inc. has agreed to pay a civil penalty of $25,000 and take a number of other actions designed to ensure its future compliance with DOE's energy efficiency standards. Last fall, the Department subpoenaed AeroSys's data on the energy use of certain heat pumps and air conditioners and then issued a demand to test 6 air conditioner models and one heat pump. DOE testing revealed that one heat pump model and two air conditioner models consumed more energy than allowed under federal efficiency standards and required AeroSys to cease distribution of those models. DOE also issued

453

ARM - Procedure for Submitting Science and Research Products to the Data  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DocumentationProcedure for Submitting Science and Research DocumentationProcedure for Submitting Science and Research Products to the Data Archive Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Procedure for Submitting Science and Research Products to the Data Archive The Principal Investigator (PI) establishes contact with an ARM Translator to describe the data product. The Translator collects enough information to describe the PI Product within the Translator group; thereby resulting in assignment of the

454

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

455

Comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program

456

Abstracts submitted for the thirty-first annual meeting, Division of Plasma Physics, November 13--17, 1989  

SciTech Connect (OSTI)

This report contains abstracts of papers that are submitted for the 31st annual meeting of the Division of Plasma Physics, November 13--17, 1989. (LSP)

Not Available

1989-09-01T23:59:59.000Z

457

Comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program

458

Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

459

IODP Manuscript Submission Instructions This document contains guidelines for submitting manuscripts to the Proceedings of the Integrated  

E-Print Network [OSTI]

IODP Manuscript Submission Instructions This document contains guidelines for submitting approved for review, the manuscript is assigned a tracking number. Please refer to the manuscript tracking

460

E-Print Network 3.0 - autoimmune diseases submitted Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 > >> 1 Please mark these dates in your calendars For more details, please visit AAN website: www.autoantibodynetwork.com Summary: Combination and Clinical Significance ...

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

462

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012

463

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 CX-010294: Categorical Exclusion Determination Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010292: Categorical Exclusion Determination Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010291: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010289: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas

464

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

465

Save Energy, Save Date Night | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy, Save Date Night Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy How can I participate? Follow these tips to save energy and money this Valentine's Day. Valentine's Day. For many couples, it means cards, flowers, and prix fixe candlelight dinners. It also means for many couples a hefty withdrawal at the ATM to express their love. Fortunately, there are ways to save money by saving energy - even during the date - so you can spend the money you save on the things that really matter to your sweetheart. Here are five easy tips for those couples out there who want to save energy, save

466

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2010 22, 2010 CX-003179: Categorical Exclusion Determination Mentasta Traditional Council CX(s) Applied: A9, A11 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003178: Categorical Exclusion Determination Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003169: Categorical Exclusion Determination Mecklenburg County Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010 Location(s): Mecklenburg County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003167: Categorical Exclusion Determination South Boston Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010

467

STUDENT RECREATION CENTER FACILITY REQUEST Group Name: ____________________________ Today's Date: __________  

E-Print Network [OSTI]

STUDENT RECREATION CENTER FACILITY REQUEST � Group Name: ____________________________ Today's Date:____________________ Time of Event: Start ______ Finish ______ � Facility Requested: o Lockridge Arena ____ Recreational Gym. _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ By requesting the Colorado School of Mines Student Recreation Center, I acknowledge that the requested activity

468

Solar Activity Index: Validity Supported by Oxygen Isotope Dating  

Science Journals Connector (OSTI)

...CENTURIES OF CLIMATIC RECORD FROM CAMP CENTURY ON GREENLAND ICE SHEET, SCIENCE...sup> concentration in Greenland Camp Century ice core, correlation with solar...activity absolute age Arctic region Camp Century ice core dates general listing...

J. R. Bray

1970-05-01T23:59:59.000Z

469

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date  

E-Print Network [OSTI]

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date Progress during: Summary of Coursework Progress (The Advisor should complete this section) Student's progress in this area): #12;Summary of Research Progress (The Advisor should complete this section) Student's progress

Contractor, Anis

470

Home Energy Score: Analysis & Improvements to Date | Department...  

Broader source: Energy.gov (indexed) [DOE]

to Date, a presentation from the U.S. Department of Energy, by Joan Glickman Senior AdvisorProgram Manager, Home Energy Score, July 24, 2012. pilotanalysiswebinar7-24-12.pdf...

471

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999  

E-Print Network [OSTI]

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999 After completion of all deliverables required under a fixed-price award, after costs in fulfilling the requirements of the award have been

Weston, Ken

472

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network [OSTI]

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST METHOD SELECTION LIST ­ CRYPTOGRAPHIC AND SECURITY TESTING NVLAP CRYPTOGRAPHIC AND SECURITY TESTING APPLICATION FORM (REV. 2013 and Security (BCS)" testing and is considered the foundation of all scopes of accreditation

473

Paleomagnetic Secular Variation (PSV), 137Cs, and Hg dating techniques  

E-Print Network [OSTI]

Portland State University Department of Geology #12;Hg-Mercury contamination dating http fission of Uranium-235 · Due to nuclear weapons testing · Highly water soluble (spreads quickly) · Half

Fountain, Andrew G.

474

Due date assignment using ADRES and simulated annealing  

Science Journals Connector (OSTI)

In this paper, flowtime estimation and/or Due Date Assignment (DDA) is studied by making use of a statistical technique, namely Adaptive Response Rate Exponential Smoothing (ADRES) and Simulated Annealing (SA). Primary objective of this study is to compare accuracies of the Due Date Assignment Models (DDAMs). In order to achieve this objective, simulation models are constructed representing different shop load level and using different despatching rules. Case by case findings are summarised in this paper.

Adil Baykasoglu; Mustafa Gocken; Zeynep D. Unutmaz

2008-01-01T23:59:59.000Z

475

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

476

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

477

Property:NEPA DecisionDocumentDate | Open Energy Information  

Open Energy Info (EERE)

DecisionDocumentDate DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the following 1 subproperty: D DOI-BLM-UT-W019-2011-0006-CX Pages using the property "NEPA DecisionDocumentDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 18 December 2007 + C CA-170-02-15 + 21 February 2002 + CA-650-2005-086 + 3 June 2006 + CA-670-2010-107 + 26 May 2010 + CA-670-2010-CX + 27 January 2010 + CA-96062042 + 31 May 2000 + D DOE-EA-1621 + 23 September 2008 + DOE-EA-1676 + 2 December 2009 + DOE-EA-1733 + 21 June 2010 + DOE-EA-1759 + 28 May 2010 + DOE-EA-1849 + 22 August 2011 + DOI-BLM-CA-C050-2009-0005-EA + 11 September 2009 +

478

Study on an automatic sorting system for Date fruits  

Science Journals Connector (OSTI)

Abstract In the present study, a machine vision based, online sorting system was developed, the aim being to sort Date fruits (Berhee CV.) based at different stages of maturity, namely Khalal, Rotab and Tamar to meet consumers demands. The system comprises a conveying unit, illumination and capturing unit, and sorting unit. Physical and mechanical features were extracted from the samples provided, and the detection algorithm was designed accordingly. An index based on color features was defined to detect Date samples. Date fruits were fed on a conveyor belt in a row. When they were at the center of the cameras field of view, a snapshot was taken, the image was processed immediately and the maturity stage of the Date was determined. When the Date passed the sensor, positioned at the end of the conveyor belt, a signal was sent to the interface circuit and an appropriate actuator, driven by a step motor, was actuated, leading the Date toward an appropriate port. For validation of proposed system performance, entire samples were again sorted by experts visually. Detection rate of the system for Tamar and Khalal was satisfactory. Although the detection rate was insufficient for the Rotab stage, there was no a significant difference between system accuracy and that obtained by the experts. The speed of image processing system was 0.34s. System capacity was 15.45kg/h.

Razieh Pourdarbani; Hamid Reza Ghassemzadeh; Hadi Seyedarabi; Fariborz Zaare Nahandi; Mohammad Moghaddam Vahed

2013-01-01T23:59:59.000Z

479

Property:NEPA RevisedApplicationDate | Open Energy Information  

Open Energy Info (EERE)

RevisedApplicationDate RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA RevisedApplicationDate" Showing 19 pages using this property. D DOI-BLM-CA-ES-2013-002+1793-EIS + 5 June 2012 + DOI-BLM-NV-C010-2010-0006-EA + 16 November 2009 + DOI-BLM-NV-C010-2010-0010-EA + 15 October 2009 + DOI-BLM-NV-C010-2011-0016-EA + 15 March 2011 + DOI-BLM-NV-C010-2012-0050-EA + 14 February 2012 + DOI-BLM-NV-C010-2012-0051-EA + 1 December 2011 + DOI-BLM-NV-C010-2012-0069-CX + 9 August 2012 + DOI-BLM-NV-C010-2012-0070-CX + 27 July 2012 + DOI-BLM-NV-E030-2011-0017-CX + 2 March 2011 + DOI-BLM-NV-W010-2010-0004-EA + 23 November 2009 + DOI-BLM-NV-W010-2011-0001-EA + 4 June 2010 +

480

Instructions for Submitting Document to OpenNet | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. Click on the LOGIN link on the top right. Read the information and check the "I agree..." box. Click on the "Request data submission access..." link at the bottom of the page. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those

Note: This page contains sample records for the topic "date submitted priority" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Submitted to the Annals of Applied Statistics INTEGRATIVE MODEL-BASED CLUSTERING OF MICROARRAY  

E-Print Network [OSTI]

, Expression, AML. 1 #12;2 KORMAKSSON ET AL. can guide the design of more specifically targeted therapies. DueSubmitted to the Annals of Applied Statistics INTEGRATIVE MODEL-BASED CLUSTERING OF MICROARRAY to multiple data types of a similar nature, which leads to an integrated analysis over multiple data platforms

Booth, James

482

Submitted to the Astrophysical Journal Emission measure distribution in loops impulsively heated at the  

E-Print Network [OSTI]

Submitted to the Astrophysical Journal Emission measure distribution in loops impulsively heated balance under the e#ects of steady heating, heat flux and radiative losses, with the magnetic field only by the evidence of sharply peaked emission measure distributions in active stars, and by the claims of isothermal

483

Security Federation in the Vehicular Networks Submitted to SAR-SSI 2011 1  

E-Print Network [OSTI]

Security Federation in the Vehicular Networks Submitted to SAR-SSI 2011 1 Federated claims based authentication and access control in the vehicular networks Ramzi Debab (r_debab@esi.dz)* Yacine Challal in order to federate the existing techniques and even future ones. WS-Federation is one of the keys aiming

Paris-Sud XI, Université de

484

M.S. Physics and Astronomy, University of Pittsburgh, 2005 Submitted to the Graduate Faculty of  

E-Print Network [OSTI]

M.S. Physics and Astronomy, University of Pittsburgh, 2005 Submitted to the Graduate Faculty of the Department of Physics and Astronomy in partial fulfillment of the requirements for the degree of Doctor of Philosophy University of Pittsburgh 2009 Andrew J. Mason B.S. Physics, State University of New York

Minnesota, University of

485

BEHAVIOUR OF A HIGHLY PRESSURISED TANK OF GHz, SUBMITTED TO A THERMAL OR MECHANICAL IMPACT  

E-Print Network [OSTI]

2000-41 BEHAVIOUR OF A HIGHLY PRESSURISED TANK OF GHz, SUBMITTED TO A THERMAL OR MECHANICAL IMPACT will significantly reduce the volume of the necessary tank(s). Whatever this pressure and whatever the volume of the tank(s), the storage System must be designed in such a way that the consequences of an accident

Paris-Sud XI, Université de

486

ApJ (submitted) Synchrotron self-inverse Compton radiation from reverse shock on  

E-Print Network [OSTI]

ApJ (submitted) Synchrotron self-inverse Compton radiation from reverse shock on GRB120326A Yuji Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588, Japan 6 Center for the Exploration of the Origin-ku, Nagoya, Aichi 464- 8601, Japan 8 Division of Particle and Astrophysical Science, Graduate School

Pak, Soojong

487

Penn Engineering Alumni Society Report : October 2010 Submitted by Farnia Fresnel, President  

E-Print Network [OSTI]

Support the Career Services mentoring program Host a summer BBQ for graduate engineering studentsPenn Engineering Alumni Society Report : October 2010 Submitted by Farnia Fresnel, President http://www.seas.upenn.edu/alumni/alumnisociety The Penn Engineering Alumni Society Board is supported by more than 30 active members who attend monthly

Plotkin, Joshua B.

488

Penn Engineering Alumni Society Report (May 2009) Submitted by Harris G. Romanoff, President ('98)  

E-Print Network [OSTI]

Participated in mock interview sessions for students, coordinated by Engineering Career Services Annual EASPenn Engineering Alumni Society Report (May 2009) Submitted by Harris G. Romanoff, President ('98) We had a very exciting and event filled calendar this past year in the Engineering Alumni Society

Plotkin, Joshua B.

489

Submitted to Handbook of Brain Theory and Neural Networks, 2. Helmholtz Machines  

E-Print Network [OSTI]

Submitted to Handbook of Brain Theory and Neural Networks, 2. Helmholtz Machines and Wake). The Helmholtz machine (Dayan et al, 1995) is an example of an approach to unsupervised learning called analysis the paired images and generators to train a graphics model. In the Helmholtz machine, we attempt to have

Dayan, Peter

490

Thermo-mechanical modeling of plasterboard lined partition submitted to fire load.  

E-Print Network [OSTI]

Thermo-mechanical modeling of plasterboard lined partition submitted to fire load. Authors: S.heck@cstb.fr Abstract: An important problem is the development of a thermo-mechanical model of plasterboard lined and the experimental validation of a deterministic and a probabilistic thermo-mechanical model of cardboard

Paris-Sud XI, Université de

491

To be submitted to ApJ A Formalism for Covariant Polarized Radiative Transport by Ray  

E-Print Network [OSTI]

To be submitted to ApJ A Formalism for Covariant Polarized Radiative Transport by Ray Tracing that the transport equation in vacuo is kµ µN = 0. We show that this is equivalent to Broderick & Blandford (2004)'s a procedure for solving the polarized radiative transfer equation in a curved spacetime. Other possible

Gammie, Charles F.

492

A. Student Record Guidelines Student records submitted become the property of the University and cannot be  

E-Print Network [OSTI]

A. Student Record Guidelines Student records submitted become the property of the University and cannot be returned to the student or released to a third party. Copies of student records will be released only upon receipt of a written request signed by the student. Student records are stored in paper

Wu, Shin-Tson

493

Instructions The following documents must be submitted before an appeal will be considered  

E-Print Network [OSTI]

Instructions The following documents must be submitted before an appeal will be considered: Appeal of Denial Form ­ this document helps the applicant explain any extenuating circumstances or information or grade reports will be accepted. Optional Requirement ­ supporting documentation to substantiate new

Tipple, Brett

494

Submitted to the XXXII th International Conference on High Energy Physics  

E-Print Network [OSTI]

of primary soft gluons into the gap gives rise to so­called global logarithms which can be resummed [9Submitted to the XXXII th International Conference on High Energy Physics August 16th -- 22nd, 2004, Beijing, China 6­0289 Parallel Session: QCD Soft Interjet Energy Flow in photoproduction at HERA ZEUS

495

Manuscript submitted to Electricity Journal 6/2/2006 Steven Letendre Richard Perez  

E-Print Network [OSTI]

Manuscript submitted to Electricity Journal 6/2/2006 Steven Letendre Richard Perez The Prometheus of the U.S. electric grid has become increasingly complex as it has been called upon to accommodate growth in total electricity consumption of 75%, accompanied by an increase in non-coincident peak demand in excess

Perez, Richard R.

496

http://mc.manuscriptcentral.com/issue-ptrsa Submitted to Phil. Trans. R. Soc. A -Issue  

E-Print Network [OSTI]

strong correlation between rates of metals usage and Gross Domestic Product (GDP) (R2 = 0.79), with per on the order of a third of the total worldwide primary energy use per year (~ 160 EJ), and contributing://mc.manuscriptcentral.com/issue-ptrsa Submitted to Phil. Trans. R. Soc. A - Issue #12;ForReview Only 1 The Energy Required to Produce Materials

Gutowski, Timothy

497

The Near-Infrared Tracks of Protostellar Outflows. A thesis submitted for the degree of  

E-Print Network [OSTI]

The Near-Infrared Tracks of Protostellar Outflows. A thesis submitted for the degree of Doctor of objects are described. In each case, the technique of near-infrared imaging is used in order to understand designed to study examples of very bright outflows in the near-infrared using the UFTI high

498

Oil Independence: Achievable National Goal or Empty Slogan? Submitted May 25, 2007  

E-Print Network [OSTI]

07--1693 Oil Independence: Achievable National Goal or Empty Slogan? Submitted May 25, 2007 Word-488-2413; email: singhm@anl.gov #12;Greene, Leiby, Patterson, Plotkin and Singh 1 ABSTRACT Oil independence has. A rigorous, measurable definition is proposed: to reduce the costs of oil dependence to less than 1% of GDP

499

Submitted to the IEEE Transactions on Biomedical Engineering Wavelet Compression of ECG Signals by the Set  

E-Print Network [OSTI]

Submitted to the IEEE Transactions on Biomedical Engineering Wavelet Compression of ECG Signals 12180-3590 January 12, 2000 Abstract A wavelet ECG data codec based on the Set Partitioning) case and applied it to compression of ECG data. Experiments on selected records from the MIT

500

A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases  

SciTech Connect (OSTI)

The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

1989-12-01T23:59:59.000Z