Powered by Deep Web Technologies
Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or State’s program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

2

Microsoft Word - EIA-914 Instructions_Expiration Date 09202012.doc  

U.S. Energy Information Administration (EIA) Indexed Site

205 205 Washington, DC 20585 Expiration Date: 09/20/2012 INSTRUCTIONS for FORM EIA-914 MONTHLY NATURAL GAS PRODUCTION REPORT PURPOSE The Energy Information Administration's (EIA) Form EIA-914 Monthly Natural Gas Production Report collects information on natural gas production by operators in the United States. Data are collected pursuant to the Federal Energy Administration (FEA) Act of 1974, Public Law 93-275. This report is mandatory under the FEA Act. The aggregated data will appear in EIA publications Natural Gas Annual, Monthly Energy Review, and Natural Gas Monthly, and on EIA's website http://www.eia.gov. REPORTING REQUIREMENTS Report must be completed by selected operators of oil and gas wells in the United States that produce natural

3

OMB No. 1905-0175 Expiration Date: 12/31/2011 Version No ...  

U.S. Energy Information Administration (EIA)

CURRENT POST-EMERGENCY PLANT OPERATIONAL STATUS MMcf/Day Expiration Date: 12/31/2011 OMB No. 1905-0175 FORM EIA-757 Schedule B: Emergency Status ...

4

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010.01 PART 2. SUBMISSION/RESUBMISSION INFORMATION Year REPORT PERIOD: If this is a ...

5

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010.01 PART 2. SUBMISSION/RESUBMISSION INFORMATION Year REPORT PERIOD: If this is a resubmission, enter an ...

6

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

7

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

8

Y-12 Lease Summary Address* (Description) Square Footage Lease Term Expiration Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Y-12 Lease Summary Y-12 Lease Summary Address* (Description) Square Footage Lease Term Expiration Date Onsite Leases 602 Scarboro Rd (New Hope Center) 137,758 square feet Five years 05/04/2012 301 Bear Creek Rd (Jack Case Center) 411,837 square feet Five years 05/04/2012 Offsite Leases 200 Summit Place (Records Storage) 24,585 square feet Five years 5/31/2015 113C Union Valley Rd (Analytical Lab) 18,450 square feet Five years 10/24/2015 115 Union Valley Rd (Warehouse) 28,800 square feet Five years 07/20/2015 1099 Commerce Park Dr. (UPF Project) 64,960 square feet One year 09/30/2011 2410 Cherahala Boulevard (UPF Project) 32,058 square feet Six Months 12/31/2011 Knoxville, Tennessee * Oak Ridge, Tennessee unless noted otherwise.

9

OMB No. 1905-0175 Expiration Date: 12/31/2011 Version No ...  

U.S. Energy Information Administration (EIA)

DATE:--Resubmission EIA ID NUMBER:7 Bbls/Day Entering Wet Gas Gas Liquids Exiting Wet Gas Gas Liquids If exiting, is the pipeline able to accept raw, ...

10

License extension for the MIT research reactor  

Science Conference Proceedings (OSTI)

On February 8, 1995, the U.S. Nuclear Regulatory Commission (NRC) amended the operating license for the Massachusetts Institute of Technology (MIT) research reactor (MITR) by extending its expiration date from May 7, 1996, to August 8, 1999. This increase of 2.25 yr in the duration of the license was for the purpose of recapturing construction time. Extensions of this type have routinely been granted to power plants. The significance of the present action is that it is the first such extension ever granted to a research reactor. This paper describes the basis for the amendment request and the supporting safety analysis.

Bernard, J.A. [Massachusetts Institute of Technology, Cambridge, MA (United States)

1995-12-31T23:59:59.000Z

11

Property:Incentive/ExpireDtString | Open Energy Information  

Open Energy Info (EERE)

ExpireDtString ExpireDtString Jump to: navigation, search Property Name Incentive/ExpireDtString Property Type String Description Expiration Date string property. Use this property in queries until the Property:Incentive/ExpireDt property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/ExpireDtString" Showing 25 pages using this property. (previous 25) (next 25) A AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 12/15/2013 + AEP Ohio - Renewable Energy Technology Program (Ohio) + 06/30/2013 + Agricultural Biomass to Energy Program (California) + 6/30/04 + Agricultural Energy Efficiency Program (New York) + 12/01/2015 + Agricultural Lighting and Equipment Rebate Program (Vermont) + 06/30/2013 +

12

Property:Incentive/ExpireDt | Open Energy Information  

Open Energy Info (EERE)

ExpireDt ExpireDt Jump to: navigation, search Property Name Incentive/ExpireDt Property Type Date Description Expiration Date. In order to see all values for this property, Property:Incentive/ExpireDtString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 140 subproperties: A Alger Delta Electric - Commercial Energy Efficiency Rebate Program (Michigan) Alternative Fueled Vehicle Charging Station Credit (Connecticut) Anaheim Public Utilities - New Construction Energy Efficiency Incentives Program (California) Arizona - Energy-Efficient Residential Appliance Rebate Program (Arizona) B Benton PUD - Agriculture Sprinklers and Motors Rebate Program (Washington)

13

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

14

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

15

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

16

BIOLOGICAL ASSESSMENT FOR BALD EAGLES FOR LICENSE RENEWAL  

E-Print Network (OSTI)

The Nuclear Regulatory Commission (NRC) is evaluating an application submitted by Virginia Electric and Power Company (VEPCo) for the renewal of the operating licenses for an additional 20 years for its Surry Power Station (SPS), Units 1 and 2. The SPS is located on the Gravel Neck Peninsula in Surry County, Virginia. The current license for Unit 1 will expire on May 25, 2012, and for Unit 2 on January 29, 2013. License renewal will extend the operating license for each unit an additional 20 years past the above dates. The proposed action would include the continued operation and maintenance of the existing facilities at the SPS site and the transmission corridor that connects the SPS, Units 1 and 2, to the regional electrical grid. The proposed action will not include any new construction or onsite disturbance. The NRC is preparing a supplement to its 1996?Generic Environmental Impact Statement for License Renewal of Nuclear Plants ” (NUREG-1437) for this proposed license renewal. As part of the renewal review, we evaluate potential impacts to Federally listed, proposed, or candidate species, as well as designated or proposed critical habitat. In a letter to the Virginia Field Office of the U.S. Fish and Wildlife Service (FWS) dated January 24, 2002, the NRC staff requested a list of Federally protected species and any critical

John P. Wolflin; U. S. Fish; Wildlife Service

2002-01-01T23:59:59.000Z

17

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

18

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

19

License Agreements  

Science Conference Proceedings (OSTI)

Standard Reference Database NIST 23 REFPROP License Information. Single Location License. A single location license ...

2013-05-06T23:59:59.000Z

20

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

22

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

23

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

24

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

25

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

26

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

27

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

28

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

29

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

30

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

31

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

32

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

33

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

34

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

35

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

36

Research License Agreement Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

37

Facility Owner Contractor Award Date End Date Options/Award Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies LLC Partners DOE Site Procurement Director DOE Contracting Officer SLAC National...

38

READY-TO-SIGN NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Bullet Detection Tracking and Stopping System Company Name 1/7 TL0_____ Date READY-TO-SIGN NONEXCLUSIVE . PATENT LICENSE AGREEMENT . This license agreement ...

39

Email licensing  

Science Conference Proceedings (OSTI)

We propose a framework, email licensing, that allows email users to determine whose messages and in what content and conditions are authorized to come into their inboxes. The idea is to treat email address as a data owned by the addressee, and any use ... Keywords: Email licensing, Personal data licensing, Spam, Unsolicited emails

Yuh-Jzer Joung; Chu-Jui Yang

2009-05-01T23:59:59.000Z

40

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Negotiable Licensing Negotiable Licensing Negotiable Licenses LANL's significant portfolio of intellectual property (patents, copyrights, and trademarks) primarily results from federally-sponsored research and development in support of the Laboratory's national security mission. Also, we collaborate with industry to develop innovative, application-specific technology to further our partner's ultimate commercialization objectives. In each case, we develop valuable technology that provides benefit to both the public and private sectors, the majority of which is available for commercial licensing. To ensure that our partners have the necessary intellectual property advantage to successfully deploy LANL technology, we offer a variety of negotiable commercial license agreements that can be tailored to suit specific market

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Halbach Array DC Motor/Generator Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Lawrence Livermore National ...

42

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Cross-Talk Free, Low-Noise Optical Amplifier Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between ...

43

Three essays on licensing university inventions  

E-Print Network (OSTI)

of inventor(s), invention title, disclosure date, patent andphases: Phase 1 - Invention’s Disclosure. The invention isDiego regarding the disclosure of inventions and licensing

Munteanu, Radu

2007-01-01T23:59:59.000Z

44

Related to the License Renewal  

E-Print Network (OSTI)

requested that the U.S. Nuclear Regulatory Commission (NRC) renew the operating license for Ginna (license number DPR-18) for a period of 20 years beyond the current expiration of midnight, September 18, 2009. The Ginna plant is located in the Town of Ontario, in the northwest corner of Wayne County, New York, on the south shore of Lake Ontario. The NRC issued the construction permit in April 1966, followed by a provisional operating license on September 19, 1969, and a full-term operating license on December 10, 1984. The Ginna unit consists of a Westinghouse pressurized-water reactor with nuclear steam supply systems designed to operate at core power levels up to 1,520 megawatts-thermal, or approximately 490 megawatts-electric. This SER presents the status of the staff’s review of information submitted to the NRC through January 9, 2004. In its SER with open items, issued on October 9, 2003, the staff identified open and confirmatory items that required resolution before the staff could make a final determination on the application. These items are summarized in Sections 1.5 and 1.6 of this

R. E. Ginna; Nuclear Power Plant; R. E. Ginna; Nuclear Power Plant

2004-01-01T23:59:59.000Z

45

Licensing NIST Technologies  

Science Conference Proceedings (OSTI)

... Partnerships Office (TPO) works with partners to license NIST patented inventions. Parties interested in licensing an issued patent or patent ...

2013-04-08T23:59:59.000Z

46

Invention to License: The Tech Transfer Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Invention to License: The Tech Transfer Process Speaker(s): Michael Mueller Robin C. Chiang Date: November 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar HostPoint of...

47

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

48

TAO: License  

NLE Websites -- All DOE Office Websites (Extended Search)

Copyright 2013 , UChicago Argonne, LLC Copyright 2013 , UChicago Argonne, LLC Operator of Argonne National Laboratory All rights reserved. Toolkit for Advanced Optimization (TAO), Version 2.2.0 OPEN SOURCE LICENSE Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Software changes, modifications, or derivative works, should be noted with comments and the author and organization's name. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

49

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

Natural Gas Plant Liquids (NGPL) and Liquefied Refinery Gases (LRG)*: 242 Propane/Propylene 246 Unfinished Oils 812 Fuel Ethanol 141 Finished Motor ...

50

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010 ...  

U.S. Energy Information Administration (EIA)

Natural Gas Plant Liquids (NGPL) and Liquefied Refinery Gases (LRG)* 242 Propane/Propylene 246 Propylene (nonfuel use) 624 Fuel Ethanol 141 Finished ...

51

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2011.01 ...  

U.S. Energy Information Administration (EIA)

If any Respondent Identification Data has changed since the last report, enter an "X" in the box: Company Name: Doing Business As: Site Name: Terminal Control Number ...

52

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2010.01 ...  

U.S. Energy Information Administration (EIA)

https://signon.eia.doe.gov/upload/noticeoog.jsp. OMB No. 1905-0165 ... Required Required Required Required Type of Commodity Port of Entry Country of Origin Quantity

53

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2011.01 ...  

U.S. Energy Information Administration (EIA)

Physical Address (e.g., Street Address, Building Number, Floor, Suite): Fax: (202) 586-1076: ... Kerosene & Light Gas Oils: 830 Heavy Gas Oils: 840 Residuum: 850

54

OMB No. 1905-0165 Expiration Date: 12/31/2011 Version No.:2009.01 ...  

U.S. Energy Information Administration (EIA)

Physical Address (e.g., Street Address, Building Number, Floor, Suite): Secure File Transfer: ... Kerosene & light gas oils 830 Heavy Gas Oils 840 Residuum 850

55

OMB No. 1905-XXXX Expiration Date: 12/31/20XX Version No.: 20XX.01 ...  

U.S. Energy Information Administration (EIA)

Secure File Transfer: Fax: ... Gas used in operations, including space heat, pipeline distribution or Burden: 3.5 hours Residential Industrial Electric Power

56

Expiration Date: 12/31/20XX Version No.: 20XX.01 Burden: 12.0 ...  

U.S. Energy Information Administration (EIA)

Secure File Transfer: 1. Yes If yes, how many vehicles in your company's fleet are powered by alternative fuels? ... Heat content of gas delivered to consumers (Btu/cf)

57

OMB No. 1905-0165 Expiration Date: 1/31/2013 Version No.:2011 ...  

U.S. Energy Information Administration (EIA)

Propane/Propylene: 246 Normal Butane/Butylene 244 ... Report storage capacity of trans-shipment and other tanks and underground storage operated as ...

58

OMB No. 1905-XXXX Expiration Date: 12/31/20XX Version No ...  

U.S. Energy Information Administration (EIA)

Type of Facility - If other, please Salt dome Aquifer Field Status - If other, please Depleting explain below in Comments. Other Depleted Field Aquifer

59

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO  

Office of Legacy Management (LM)

OF AMERICA OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York 23, N. Y. This application may be used for an original license or for the renewal of a license. In the case of a rrnewal, this application should be received by the Commission on or before 30 days before the expiration of the previous license. Complete blocks 1, 2, 3, 9. and if

60

Solar Heating Contractor Licensing  

Energy.gov (U.S. Department of Energy (DOE))

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

NREL: Technology Transfer - Licensing Agreements  

National Renewable Energy Laboratory Technology Transfer Licensing Agreements. Through licensing agreements, NREL provides industry with an opportunity to ...

62

California Nuclear Profile - Diablo Canyon  

U.S. Energy Information Administration (EIA) Indexed Site

Diablo Canyon" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

63

Tennessee Nuclear Profile - Sequoyah  

U.S. Energy Information Administration (EIA) Indexed Site

Sequoyah" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

64

Texas Nuclear Profile - South Texas Project  

U.S. Energy Information Administration (EIA) Indexed Site

South Texas Project" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

65

Pennsylvania Nuclear Profile - Limerick  

U.S. Energy Information Administration (EIA) Indexed Site

Limerick" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

66

Florida Nuclear Profile - Turkey Point  

U.S. Energy Information Administration (EIA) Indexed Site

Turkey Point" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

67

Mississippi Nuclear Profile - Grand Gulf  

U.S. Energy Information Administration (EIA) Indexed Site

Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

68

Florida Nuclear Profile - St Lucie  

U.S. Energy Information Administration (EIA) Indexed Site

St Lucie" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

69

South Carolina Nuclear Profile - H B Robinson  

U.S. Energy Information Administration (EIA) Indexed Site

H B Robinson" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

70

Florida Nuclear Profile - Crystal River  

U.S. Energy Information Administration (EIA) Indexed Site

Crystal River1" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

71

Connecticut Nuclear Profile - Millstone  

U.S. Energy Information Administration (EIA) Indexed Site

Millstone" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

72

North Carolina Nuclear Profile - Harris  

U.S. Energy Information Administration (EIA) Indexed Site

Harris" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

73

New Hampshire Nuclear Profile - Seabrook  

U.S. Energy Information Administration (EIA) Indexed Site

Seabrook" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

74

Georgia Nuclear Profile - Edwin I Hatch  

U.S. Energy Information Administration (EIA) Indexed Site

Edwin I Hatch" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

75

North Carolina Nuclear Profile - McGuire  

U.S. Energy Information Administration (EIA) Indexed Site

McGuire" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

76

Alabama Nuclear Profile - Browns Ferry  

U.S. Energy Information Administration (EIA) Indexed Site

Browns Ferry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

77

Wisconsin Nuclear Profile - Kewaunee  

U.S. Energy Information Administration (EIA) Indexed Site

Kewaunee" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer cpacity factor (percent)","Type","Commercial operation date","License expiration date"...

78

Ohio Nuclear Profile - Davis Besse  

U.S. Energy Information Administration (EIA) Indexed Site

Davis Besse" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

79

Arizona Nuclear Profile - Palo Verde  

U.S. Energy Information Administration (EIA) Indexed Site

Palo Verde" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

80

Louisiana Nuclear Profile - River Bend  

U.S. Energy Information Administration (EIA) Indexed Site

River Bend" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Pennsylvania Nuclear Profile - PPL Susquehanna  

U.S. Energy Information Administration (EIA) Indexed Site

PPL Susquehanna" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

82

New York Nuclear Profile - James A Fitzpatrick  

U.S. Energy Information Administration (EIA) Indexed Site

James A Fitzpatrick" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

83

Pennsylvania Nuclear Profile - Beaver Valley  

U.S. Energy Information Administration (EIA) Indexed Site

Beaver Valley" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

84

Illinois Nuclear Profile - Clinton Power Station  

U.S. Energy Information Administration (EIA) Indexed Site

Clinton Power Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

85

Nebraska Nuclear Profile - Cooper  

U.S. Energy Information Administration (EIA) Indexed Site

Cooper" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

86

South Carolina Nuclear Profile - Catawba  

U.S. Energy Information Administration (EIA) Indexed Site

Catawba" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

87

Michigan Nuclear Profile - Donald C Cook  

U.S. Energy Information Administration (EIA) Indexed Site

Donald C Cook" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

88

Michigan Nuclear Profile - Fermi  

U.S. Energy Information Administration (EIA) Indexed Site

Fermi" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

89

New Jersey Nuclear Profile - Oyster Creek  

U.S. Energy Information Administration (EIA) Indexed Site

Oyster Creek" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

90

Texas Nuclear Profile - Comanche Peak  

U.S. Energy Information Administration (EIA) Indexed Site

Comanche Peak" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

91

Michigan Nuclear Profile - Palisades  

U.S. Energy Information Administration (EIA) Indexed Site

Palisades" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

92

Georgia Nuclear Profile - Vogtle  

U.S. Energy Information Administration (EIA) Indexed Site

Vogtle" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

93

Illinois Nuclear Profile - Byron Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Byron Generating Station" ,"Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

94

South Carolina Nuclear Profile - V C Summer  

U.S. Energy Information Administration (EIA) Indexed Site

V C Summer" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

95

Louisiana Nuclear Profile - Waterford 3  

U.S. Energy Information Administration (EIA) Indexed Site

Waterford 3" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

96

Vermont Nuclear Profile - Vermont Yankee  

U.S. Energy Information Administration (EIA) Indexed Site

Vermont Yankee" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

97

Virginia Nuclear Profile - Surry  

U.S. Energy Information Administration (EIA) Indexed Site

Surry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

98

Minnesota Nuclear Profile - Monticello  

U.S. Energy Information Administration (EIA) Indexed Site

Monticello" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

99

Ohio Nuclear Profile - Perry  

U.S. Energy Information Administration (EIA) Indexed Site

Perry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

100

Pennsylvania Nuclear Profile - Peach Bottom  

U.S. Energy Information Administration (EIA) Indexed Site

Peach Bottom" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Virginia Nuclear Profile - North Anna  

U.S. Energy Information Administration (EIA) Indexed Site

North Anna" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

102

Alabama Nuclear Profile - Joseph M Farley  

U.S. Energy Information Administration (EIA) Indexed Site

Joseph M Farley" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

103

South Carolina Nuclear Profile - Oconee  

U.S. Energy Information Administration (EIA) Indexed Site

Oconee" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

104

North Carolina Nuclear Profile - Brunswick  

U.S. Energy Information Administration (EIA) Indexed Site

Brunswick" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

105

New York Nuclear Profile - Indian Point  

U.S. Energy Information Administration (EIA) Indexed Site

Indian Point" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

106

Minnesota Nuclear Profile - Prairie Island  

U.S. Energy Information Administration (EIA) Indexed Site

Prairie Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

107

Nebraska Nuclear Profile - Fort Calhoun  

U.S. Energy Information Administration (EIA) Indexed Site

Fort Calhoun" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License Expiration Date"...

108

Missouri Nuclear Profile - Callaway  

U.S. Energy Information Administration (EIA) Indexed Site

Callaway" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

109

Pennsylvania Nuclear Profile - Three Mile Island  

U.S. Energy Information Administration (EIA) Indexed Site

Three Mile Island" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

110

Arkansas Nuclear Profile - Arkansas Nuclear One  

U.S. Energy Information Administration (EIA) Indexed Site

Nuclear One" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

111

License Iso. CM35  

Office of Legacy Management (LM)

License Iso. CM35 License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb fual oleroat f*hrlcmtlon. You are nirthcr licensed to transfer aad deliver poaaeeslon of and title to refined ecwce material to any person licensed by the Atcmlc Energy ~~slon, VitAin the limits of his license. i f Am a condition of iemzaace of thie llcenee, you are required to maintain

112

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

113

END USER LICENSE  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

114

END USER LICENSE SAC  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

115

Licensing Berkeley Lab Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

to inquire. For more information on licensing, please see Frequently Asked Questions . Contact Us Receive Customized Tech Alerts Tech Transfer Site Map Last updated: 09172009...

116

Licensing Guidelines | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

parties. Licenses that include the right to sublicense to others also include financial terms for sublicensing revenue that is based on the commercialization of the technology by a...

117

License Application Guidelines  

market, and describe how the funding will be obtained. LICENSE APPLICATION GUIDELINES– 6. ... Key events that have led to your company’s current position in the

118

Licensable Life Science Technologies | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensable Life Science Technologies A selection of biology-based technologies available for licensing licensablebiologicaltechnologies...

119

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

120

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Received Date:  

E-Print Network (OSTI)

As a student at Ramapo College of New Jersey in the environmental program, I have been evaluating the DSEIS for the re-licensing of Indian Point. When the EIS was generated in the late 1990’s to begin the re-licensing process for Indian Point 2 and 3, there was no evaluation included in the document on the visual impacts the facility posed to the surrounding view shed. This includes the construction of the proposed cooling tower. The Indian Point facility is visible from several different elevations and vantage points along the Hudson River Valley, posing different impacts to the communities of varying income and minority populations surrounding Indian Point. In 1975 a study was done by Grant R. Jones evaluating the visual impacts of various cooling tower options at Indian Point Nuclear Facility. This study looked at the visual impacts from the proposed cooling tower, including the height of the concrete structure and varying size and thickness of the moisture plume produced. Both of these elements can be impacted with changes in weather and wind patterns. The study concluded that the construction of a cooling tower at Indian Point would have an even greater adverse affect on the view shed than the facility itself already posses (Jones, Ady & Gray, 1979). The mayor of the Village of Buchanan also expressed his

Andrew Stuyvenberg; Post Office

2009-01-01T23:59:59.000Z

122

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

123

Washington Nuclear Profile - Columbia Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Columbia Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

124

Illinois Nuclear Profile - LaSalle Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

LaSalle Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

125

Tennessee Nuclear Profile - Watts Bar Nuclear Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Watts Bar Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

126

Wisconsin Nuclear Profile - Point Beach Nuclear Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Point Beach Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

127

Illinois Nuclear Profile - Dresden Generating Station  

U.S. Energy Information Administration (EIA) Indexed Site

Dresden Generating Station" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

128

Iowa Nuclear Profile - Duane Arnold Energy Center  

U.S. Energy Information Administration (EIA) Indexed Site

Duane Arnold Energy Center" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

129

PNNL: Technology Transfer - Our Licensing Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Licensing Guidelines PNNL approaches licensing in a flexible, collaborative manner Although every technology license is unique, at PNNL we recognize that there are basic...

130

Get Your Federal Tax Credits for Energy Efficiency Before They Expire |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Get Your Federal Tax Credits for Energy Efficiency Before They Get Your Federal Tax Credits for Energy Efficiency Before They Expire Get Your Federal Tax Credits for Energy Efficiency Before They Expire November 21, 2013 - 3:46pm Addthis Take advantage of tax credits for energy-efficient purchases before the end of the year. | Photo courtesy of ©iStockphoto.com/Tsuji Take advantage of tax credits for energy-efficient purchases before the end of the year. | Photo courtesy of ©iStockphoto.com/Tsuji Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? If you plan to purchase certain energy-efficient products before the end of the year, you could receive a federal tax credit. December is just around the corner, and so is the expiration for some of

131

Get Your Federal Tax Credits for Energy Efficiency Before They Expire |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Get Your Federal Tax Credits for Energy Efficiency Before They Get Your Federal Tax Credits for Energy Efficiency Before They Expire Get Your Federal Tax Credits for Energy Efficiency Before They Expire November 21, 2013 - 3:46pm Addthis Take advantage of tax credits for energy-efficient purchases before the end of the year. | Photo courtesy of ©iStockphoto.com/Tsuji Take advantage of tax credits for energy-efficient purchases before the end of the year. | Photo courtesy of ©iStockphoto.com/Tsuji Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? If you plan to purchase certain energy-efficient products before the end of the year, you could receive a federal tax credit. December is just around the corner, and so is the expiration for some of

132

Argonne TDC: Licensing Intellectual Property from Argonne ...  

Licensing Intellectual Property from Argonne National Laboratory. Argonne's licensing program provides companies with opportunities to acquire rights in Argonne ...

133

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

134

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

135

Transmittal of Additional Information For License  

E-Print Network (OSTI)

By letter dated June 5, 2001 Southern Nuclear Operating Company (SNC) formally transmitted the collected responses to eighteen open items contained in the draft license renewal Safety Evaluation Report to NRC. Since that time additional information has been developed on several open items, and Appendix B, the FSAR Supplement, and various application sections have been revised. This letter formally transmits all additional information related to the Hatch license renewal application and the related open items, and is intended to complete the documentation necessary to allow the open items to be closed by the NRC. If you have any questions concerning this information, please contact this office. Respectfully submitted, HLS/JAM H. L. Sumner, Jr. Enclosures:

Lewis Sumner; Edwin I. Hatch; Nuclear Plant

2001-01-01T23:59:59.000Z

136

NREL: Technology Transfer - Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

137

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Contractor Licensing Provider California Contractors State License Board The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems, and photovoltaic systems. C-46 requirements include four years of experience and passing the business and law exam and the trade exam. Independent license schools offer courses to prepare for license exams.

138

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State Florida Program Type Solar/Wind Contractor Licensing Provider Florida Solar Energy Industries Association Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued since that time, although people holding these licenses may renew them. The new solar contractor license defines a broader scope of work. With the new license, solar contractors have the authority to install, maintain and

139

License Renewal Application PREFACE  

E-Print Network (OSTI)

The following describes the information location, layout, and editorial conventions in the Beaver Valley Power Station (BVPS) License Renewal Application (hereinafter referred to as “this application ” or “the application”). Abbreviated names and acronyms used throughout the application are defined at the end of this preface. Commonly understood terms (such as U.S.) and terms used only in referenced document numbers may not be identified in this table. Regulatory documents such as NUREG-1801, Generic Aging Lessons Learned (GALL) Report,

Beaver Valley; Power Station

2007-01-01T23:59:59.000Z

140

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Technology Licensing Contacts | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

(865) 574-1051 Biography Robert Scott Administrative Assistant scottre@ornl.gov (865) 241-2356 Jennifer Caldwell Technology Licensing, Group Leader caldwelljt@ornl.gov (865)...

142

Section 1603 Treasury Grant Expiration: Industry Insight on Financing and Market Implications  

NLE Websites -- All DOE Office Websites (Extended Search)

§1603 Treasury Grant §1603 Treasury Grant Expiration: Industry Insight on Financing and Market Implications Michael Mendelsohn National Renewable Energy Laboratory John Harper Birch Tree Capital, LLC Technical Report NREL/TP-6A20-53720 June 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 §1603 Treasury Grant Expiration: Industry Insight on Financing and Market Implications Michael Mendelsohn National Renewable Energy Laboratory John Harper Birch Tree Capital, LLC

143

Renewable Energy Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Renewable Energy Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Oregon Program Type Solar/Wind Contractor Licensing Provider Department of Consumer and Business Services Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction. Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of making plumbing

144

Technologies Available for Licensing | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies SHARE Available Technologies One of the primary missions of the Technology Transfer Division is to move our intellectual property from the research facility to the commercial

145

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Nevada Program Type Solar/Wind Contractor Licensing Provider Nevada State Contractors Board - Reno Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar water heating and space heating and air conditioning). Contractors may also perform solar work under License Classification C-1* (plumbing and heating), sub-classification (d) for solar water heating installations, or

146

DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT This Agreement ...  

Daness Developers Web License,.Version, 4.5, Sept. 2009 1 DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne ...

147

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

general plumbing contractors carrying an S210 license are authorized to install solar thermal systems. The Division has also established solar-specific license classifications....

148

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; Ready-to-Sign Licenses; DOE SBIR TTI; Government Use Notices; News; Contact Us; Technology Summary

149

NREL: Technology Transfer - Nonexclusive and Exclusive Licenses  

Nonexclusive and Exclusive Licenses. NREL's technology licensing agreements with companies are either nonexclusive or exclusive depending on their field of use.

150

Featured Licensing Professional - Energy Innovation Portal  

Eric Payne. Meet Eric Payne! Eric is the Senior Licensing Executive at the National Renewable Energy Laboratory and one of the licensing contacts on the Energy ...

151

Property:FERC License | Open Energy Information  

Open Energy Info (EERE)

License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

152

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

and operate Lawrence Livermore National Laboratory ... which may be useful for human health treatment ... Licensed Service” means the use of Licensed ...

153

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Eligibility InstallerContractor Savings For Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling...

154

How to License Technologies | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | How To License ORNL Technologies SHARE How To License ORNL Technologies Technology Evaluation The first step in the licensing process is for you to identify technologies of interest to you. As a starting point, you may wish to browse the available technologies or search using keywords and the ORNL InSpire Technology Search Engine. At any point in your search, please feel free to contact the commercialization manager identified for each technology or

155

Alternative Fuels Data Center: Ethanol License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol License to Ethanol License to someone by E-mail Share Alternative Fuels Data Center: Ethanol License on Facebook Tweet about Alternative Fuels Data Center: Ethanol License on Twitter Bookmark Alternative Fuels Data Center: Ethanol License on Google Bookmark Alternative Fuels Data Center: Ethanol License on Delicious Rank Alternative Fuels Data Center: Ethanol License on Digg Find More places to share Alternative Fuels Data Center: Ethanol License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for each license is $25. (Reference Wyoming

156

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

157

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

158

Exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

5.20.2011 UU.S. DEPARTMENT OF ENERGY UNATIONAL ENERGY TECHNOLOGY LABORATORY UEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

159

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Arizona Program Type Solar/Wind Contractor Licensing Provider Registrar of Contractors The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are required for electrical work on residential property and L-11 licenses apply to commercial installations. Contractors can also acquire a K-11 license to work on both residential and commercial installations. The Arizona Registrar of Contractors does have a specific plumbing license

160

Section 1603 Treasury Grant Expiration: Industry Insight on Financing and Market Implications  

SciTech Connect

In the wake of the 2008-2009 financial crises, tax equity investors largely withdrew from the market, resulting in stagnation of project development. In response, Congress established the Treasury grant program pursuant to Section 1603 of the American Recovery and Reinvestment Act (..Section..1603 Program) to offer a cash payment in lieu of a production and investment tax credit. This study addresses the likely project financing and market impacts from the expiration of the ..Section..1603 Program. The authors assembled an array of insights offered by financial executives active in the renewable energy (RE) market during conference panel discussions and in presentations, direct interviews, and email correspondences. This analysis found that the ..Section..1603 Program alleviated the need to monetize the tax credit incentives through specialized investors, helped lower the transaction and financing costs associated with renewable electricity projects, and generally supported an extensive build-out of renewable power generation capacity. With the expiration of the ..Section..1603 Program, smaller or less-established renewable power developers will have more difficulty attracting needed financial capital and completing their projects, development of projects relying on newer or 'innovative' technologies will likely slow as traditional tax equity investors are known to be highly averse to technology risk in the projects they fund, and, finally, projects relying on tax equity may be more expensive to develop due to higher transaction costs and potentially higher yields required to attract tax equity.

Mendelsohn, M.; Harper, J.

2012-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Any person acting as an alternative fuels dealer must hold a valid alternative fuel license and certificate from the Wisconsin Department of Administration. Except for alternative fuels that a dealer delivers into a

162

U.S. Material Licenses  

E-Print Network (OSTI)

There are approximately 22,400 licenses issued for medical, academic, industrial, and general uses of radioactive materials in the United States. The United States Nuclear Regulatory Commission (NRC) and State radiation safety regulatory programs are responsible for ensuring protection of public health and safety and the environment. Currently, there are approximately 3,450 licenses issued by the NRC and 18,950 licenses issued by the 36 Agreement States. An Agreement State is any state with which the Atomic Energy Commission or the Nuclear Regulatory Commission has entered into an Agreement under subsection 274b of the Atomic Energy Act of 1954 (as amended). Definition of the National Materials Program The National Materials Program (NMP) is a term that has been used for many years, to define the broad collective framework within which both NRC and the Agreement States function in carrying out their respective radiation safety regulatory programs. This framework also includes

unknown authors

2009-01-01T23:59:59.000Z

163

NREL: Technology Transfer - Technologies Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Available for Licensing Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing, visit the EERE Innovation Portal and search for NREL. Learn about our licensing agreement process. Contact For more information about licensing NREL-developed technologies, contact Eric Payne, 303-275-3166. Ombuds NREL strives to quickly resolve any issue or concern you may have regarding

164

Sandia National Laboratories : Licensing/Technology Transfer ...  

Ready-to-Sign licenses require that R & D and substantial manufacture of the licensed product occur within the U.S. to provide benefit to the U.S. economy.

165

Licensing Opportunity Announcements | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Licensing | Licensing Opportunity Announcements SHARE Licensing Opportunity Announcements UT-Battelle, LLC, acting under its Prime Contract No. ORNL Laboratory Director Signs New License Agreement DE-AC05-00OR22725 with the U.S. Department of Energy (DOE) for the management and operation of the Oak Ridge National Laboratory (ORNL), is posting notice of near-term license opportunities for technologies listed on this page and is requesting license applications from potential commercialization partners. ORNL will license these technologies in defined fields of use. License applications will be evaluated based on prospective partners' ability and commitment to successfully commercialize the technology, with a preference for United States-based

166

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Alternative fuel providers, bulk users, and retailers, or any person who fuels an alternative fuel vehicle from a private source that does not pay

167

Guide to Microsoft Volume Licensing June 2013 i  

E-Print Network (OSTI)

Guide to Microsoft Volume Licensing June 2013 i Guide to Microsoft Volume Licensing #12;Guide to Microsoft Volume Licensing June 2013 ii Table of Contents Chapter 1: Introduction to Microsoft Volume................................................................................................................................................................ 1 Keys to Understanding Microsoft Volume Licensing

Narasayya, Vivek

168

Sandia National Laboratories Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; Sandia National Laboratories Technologies Available for Licensing

169

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; ... National Defense and Security; Molecular Spectroscopy; Imaging Array; Medical Imaging; Remote ...

170

Advanced Materials Technologies Available for Licensing ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

171

Solar Thermal Technologies Available for Licensing ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

172

Biomass and Biofuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Biomass and Biofuels Technologies Available for Licensing - Energy Innovation ...

173

Solar Photovoltaic Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Solar Photovoltaic Technologies Available for Licensing - Energy Innovation Portalto ...

174

Vehicles and Fuels Technologies Available for Licensing ...  

Vehicles and Fuels Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

175

Ames Laboratory Technologies Available for Licensing - Energy ...  

Bookmark Ames Laboratory Technologies Available for Licensing - Energy Innovation Portal on Google; Bookmark Ames Laboratory Technologies Available ...

176

Energy Storage Technologies Available for Licensing ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage ...

177

Industrial Technologies Available for Licensing - Energy ...  

Industrial Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have technologies ...

178

Geothermal Technologies Available for Licensing - Energy ...  

Geothermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating institutions research and develop ...

179

Sandia National Laboratories : Licensing/Technology Transfer  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; Licensing and Technology Transfer. IP Home; Search ...

180

Review of export license applications (Strategic Trade Control...  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Nonproliferation & National Security (NPNS) Overview Technical Nonproliferation Policy Support Strategic Trade Control Review of export license applications Multilateral...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Windows Server 2008 R2 Licensing Guide  

E-Print Network (OSTI)

Windows Server 2008 R2 Licensing Guide m Your Comprehensive Resource for Licensing and Pricing #12;2 Table of Contents Summary 3 Table of Windows Server 2008 R2 Core Product Offerings 3 License Terms ­ Windows Server 2008 R2 Product Line Updates 4 Edition Comparison by Server Role 5 New and Updated Features

Narasayya, Vivek

182

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Success Stories Success Stories Commercialization and Licensing Economic Development Industrial Partnerships Sponsored Research Partnerships Home | Connect with ORNL | For Industry | Partnerships | Success Stories | Commercialization and Licensing Success Stories Commercialization and Licensing 1-10 of 14 Results Prev 12 Next DNP Green Technology, Inc. Exclusively Licenses Patents Invented at Argonne National Laboratory and Oak Ridge National Laboratory March 09, 2010 - On March 9, 2010, UT-Battelle, LLC, UChicago Argonne, LLC, and DNP Green Technology, INC fully executed an exclusive license agreement for patents invented solely by Argonne National Laboratory and jointly by Oak Ridge National Laboratory (ORNL) and Argonne National Laboratory (ANL). GE-Reuter Stokes to Market SNS-Designed Electronics

183

License Transfer For The Proposed Merger Qf Duke Energy Corporation And Progress Energy  

E-Print Network (OSTI)

(ML11110A031)) 2. NRC e-mail from Brenda L. Mozafari titled, CPL and FPL Indirect License Transfer (TAC No. ME5970), dated July 22, 2011 3. Progress Energy letter from James Scarola to the NRC Document Control Desk titled, Response

Docket No

2011-01-01T23:59:59.000Z

184

For The Calvert Cliffs Combined License Application  

E-Print Network (OSTI)

The purpose of this letter is to respond to the requests for additional information (RAIs) identified in the NRC letter to UniStar dated February 3, 2009 (Reference 1). The RAIs address figures needed to publish the environmental impact statement (EIS) and information necessary for completion of regulatory reviews. UniStar Regulatory Affairs staff, UniStar vendors for the Calvert Cliffs Nuclear Power Plant Unit 3 (CCNPP3) project, NRC headquarters staff, and NRC contractors supporting review of the CCNPP3 Combined License Application (COLA) environmental report discussed the scope of the RAIs (Reference 1) during four telephone conferences on February 13, 18, 19, and 24. The discussions focused on how UniStar can provide the NRC with graphics needed to develop the CCNPP3 Draft EIS and necessary additional details of environmental reviews performed by UniStar. The telephone conferences resulted in a common understanding of the NRC requests and how UniStar can provide the needed information (Reference 2).UN#09-1140 Page 2 of 2 The NRC staff agreed that certain information regarding alternate sites is available in the

unknown authors

2009-01-01T23:59:59.000Z

185

License integration patterns: Addressing license mismatches in component-based development  

Science Conference Proceedings (OSTI)

In this paper we address the problem of combining software components with different and possibly incompatible legal licenses to create a software application that does not violate any of these licenses while potentially having its own. We call this ...

Daniel M. German; Ahmed E. Hassan

2009-05-01T23:59:59.000Z

186

University of Colorado Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; University of Colorado Technologies Available for Licensing The University of Colorado ...

187

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

United States Department of Energy (“DOE”) Contract No. DE-AC52-07NA27344 to manage ... Sale, or import of the Licensed Products, performance of ...

188

Wind Energy Technologies Available for Licensing - Energy ...  

Wind Energy Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have wind energy ...

189

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

190

Solar Thermal Technologies Available for Licensing - Energy ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have concentrating solar power ...

191

Overview of the Yucca Mountain Licensing Process  

SciTech Connect

This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process.

M. Wisenburg

2004-05-03T23:59:59.000Z

192

Sandia National Laboratories : Licensing/Technology Transfer ...  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; IP Management, Alliances & Licensing Contacts. IP Home; Search/Browse ...

193

NREL: Technology Transfer - Technologies Available for Licensing  

NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing.

194

Vehicles and Fuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Vehicles and Fuels Technologies Available for Licensing - Energy Innovation Portalto ...

195

Licensing - Oak Ridge National Laboratory | ORNL  

Licensing Things You Should Know about Working with ORNL. UT-Battelle manages and operates ORNL under a contract with the U.S. Department of Energy (DOE).

196

Non-exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

197

Exclusive Patent License Agreement between Alliance and ...  

In such event, Alliance shall be free to license such rights to third parties without further obligation to Licensee. 8.5 Alliance agrees, ...

198

Wind Energy Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Wind Energy Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

199

Energy Storage Technologies Available for Licensing - Energy ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage technologies ...

200

Startup America Technologies Available for Licensing - Energy ...  

Startup America Technologies Available for Licensing “Startup America” is a White House initiative to celebrate, inspire, and accelerate high-growth ...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Exclusive Patent License for ORNL Graphite Foam Technology January 28, 2010 - Light-emitting diode (LED) lamps are increasingly in demand in industrial and commercial...

202

Advanced Materials Technologies Available for Licensing - Energy ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have advanced materials ...

203

Geothermal Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Geothermal Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

204

License  

E-Print Network (OSTI)

EWF is short for Expert Witness Compression Format, according to [ASR02]. It is a file type used to store media images for forensic purposes. It is currently widely used in the field of computer forensics in proprietary tooling like EnCase en FTK. The original specification of the format is provided by ASRDATA, for the SMART application. This document is intended as a working document for the EWF specification. Which should allow existing Open Source forensic tooling to be able to process this file type. page iDocument information Author(s):

Joachim Metz; Joachim Metz

2006-01-01T23:59:59.000Z

205

License  

E-Print Network (OSTI)

This report documents the program and the outcomes of Dagstuhl Seminar 11181 “Organic Computing – Design of Self-Organizing Systems”.

Kirstie Bellman; Andreas Herkersdorf; Michael G. Hinchey; Tu München De; Andreas Herkersdorf; Mike Hinchey; Christian Müller-schloer; Hartmut Schmeck; Rolf Würtz; Kirstie Bellman; Andreas Herkersdorf; Mike Hinchey; Christian Müller-schloer; Hartmut Schmeck; Rolf Würtz

2011-01-01T23:59:59.000Z

206

Characterization of human expired breath by solid phase microextraction and analysis using gas chromatography-mass spectrometry and differential mobility spectrometry  

E-Print Network (OSTI)

Breath analysis has potential to become a new medical diagnostic modality. In this thesis, a method for the analysis of human expired breath was developed using gas chromatography-mass spectroscopy. It was subsequently ...

Merrick, William (William F. W.)

2005-01-01T23:59:59.000Z

207

RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION OF URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

radiological criteria for building surfaces and radionuclides other than radium in soil, for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-98-084, dated August 11, 1998 (Attachment 1), the Commission indicated that it did not object to the staff's recommendation to use the radium benchmark dose in developing a final rule applicable to uranium recovery licensees. The final rule addresses radiological criteria for decommissioning land and buildings required for license termination for uranium recovery facilities, e.g., uranium mills and in situ leach facilities (ISLs). The final rule will provide a clear and consistent regulatory basis for determining the extent to which lands and structures can be considered to be decommissioned. BACKGROUND: On August 22, 1994 (59 FR 43200), the U.S. Nuclear Regulatory Commission (NRC) published a proposed rule for comment in the Federal Register, to amend 10 CFR Part 20, "Standards for Protection Against Radiation, " to include radiological criteria for decommissioning as subpart E. The proposed rule applied to uranium mill facilities and other NRC licensees, but did not apply to mill tailings disposal or to soil radium cleanup at mills because the radiological criteria for these activities are regulated under 10 CFR Part 40, Appendix A. Some commenters recommended that the rule exempt conventional thorium and uranium mill facilities and ISLs. In SECY-97-046A, dated March 28, 1997, entitled "Final Rule on Radiological Criteria for License Termination, " the staff recommended that the final rule indicate that for uranium and thorium mill facilities the cleanup of radionuclides other than radium from soil and buildings must result in a dose no greater than the dose resulting from the cleanup of radium-contaminated soil (benchmark

William D. Travers /s

1999-01-01T23:59:59.000Z

208

State Nuclear Profiles 2009  

U.S. Energy Information Administration (EIA)

Vermont Yankee 1 620 5,361 98.7 BWR 11/30/1972 3/21/2012 620 5,361 98.7 Data for 2009 BWR = Boiling Water Reactor. License Expiration Date

209

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

210

Technologies licensed | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies licensed Technologies licensed Technologies licensed Posted: July 16, 2012 - 3:49pm | Y-12 Report | Volume 9, Issue 1 | 2012 Rendering of Y-12's Access Rate Control System Wherever threatening situations arise, in-place security measures make the most of every second. On Feb. 8, a startup firm in Knoxville, Tenn., licensed two security-related technologies from the Y-12 National Security Complex that do just that. The technologies, which delay entrance to controlled-access areas, provide a security solution for various potential markets: commercial nuclear facilities, pharmaceutical manufacturers, correctional facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate

211

Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Liquefied Petroleum Liquefied Petroleum Gas (Propane) License to someone by E-mail Share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Facebook Tweet about Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Twitter Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Google Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Delicious Rank Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Digg Find More places to share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Liquefied Petroleum Gas (Propane) License

212

Solar/Wind Contractor Licensing | Open Energy Information  

Open Energy Info (EERE)

Solar/Wind Contractor Licensing Solar/Wind Contractor Licensing < Solar Jump to: navigation, search Some states have established a licensing process for solar-energy contractors and/or wind-energy contractors. These requirements are designed to ensure that contractors have the necessary knowledge and experience to install systems properly. Solar licenses typically take the form of either a separate, specialized solar contractor's license, or a specialty classification under a general electrical or plumbing license. [1] Solar/Wind Contractor Licensing Incentives CSV (rows 1 - 24) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy System Contracting (Virginia) Solar/Wind Contractor Licensing Virginia Installer/Contractor Photovoltaics No

213

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heating Program Information Louisiana Program Type SolarWind Contractor Licensing All solar and wind energy installations must be performed by a contractor duly licensed by and...

214

LAWRENCE LIVERMORE NATIONAL LABORATORY OVERVIEW OF LLNL LICENSE ...  

one or more fields of use. ... c. Security and energy conservation; d. ... Number of Licenses Total Cost for All Licenses 1 $100,000

215

Ready-to-Sign Licensing Instructions - Industrial Partnerships ...  

Ready-to-Sign Licensing Instructions. Read the Notice for RTS License Agreement and complete Commercialization Information Form; Select a technology from the patents ...

216

Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT DEPARTMENT-OWNED CONTRACTOR-OPERATED LABORATORIES, DOEIG-0479 Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES...

217

Argonne TDC: Licensing Intellectual Property from Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Property from Argonne National Laboratory Argonne's licensing program provides companies with opportunities to acquire rights in Argonne inventions and copyrights. Licenses...

218

Technology Transfer: Success Stories: Licensed Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensed Technologies Licensed Technologies Here are some of our licensees and the technologies they are commercializing; see our Start-Up Company page for more of our technology licenses. Company (Licensee) Technology Life Technologies Corp. Cell lines for breast cancer research Bristol Myers Squibb; Novartis; Plexxikon Inc.; Wyeth Research; GlaxoSmithKline; Johnson & Johnson; Boehringer Ingelheim Pharmaceuticals, Inc.; Genzyme Software for automated macromolecular crystallography Shell International Exploration and Production; ConnocoPhillips Company; StatOil ASA; Schlumburger Technology Corportation; BHP Billiton Ltd.; Chevron Energy Technology Company; EniTecnologie S.p.A. Geo-Hydrophysical modeling software Microsoft Home Energy Saver software distribution Kalinex Colorimetric bioassay

219

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

220

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

222

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

223

File:03MTDLandUseLicenseProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

MTDLandUseLicenseProcess (1).pdf MTDLandUseLicenseProcess (1).pdf Jump to: navigation, search File File history File usage File:03MTDLandUseLicenseProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:05, 1 October 2012 Thumbnail for version as of 12:05, 1 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-d - Land Use License Process

224

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

225

Monticello Lead Plant License Renewal Project Summary Report  

Science Conference Proceedings (OSTI)

This report summarizes license renewal evaluation activities from the Monticello Lead Plant License Renewal Project (MLP Project) that were conducted between October 1988 and December 1992. The lessons learned during this first plant-specific license renewal evaluation provide valuable information that utilities can use when initiating a license renewal effort.

1996-10-06T23:59:59.000Z

226

An economic analysis of land use alternatives on CRP land trees after the CRP contracts expire in east Texas  

E-Print Network (OSTI)

Landowners who have planted trees on CRP land must decide whether to retain the trees or divert land to others uses after the contracts expire. An economic tool is developed to assist landowners in making the most profitable choice between retaining trees to produce sawlogs or pulpwood and reverting land to crops, corn, cotton, sorghum and wheat. A generic theoretical framework is formulated to compare various land use alternatives. Several scenarios are formulated to incorporate the changing patterns of variables and to examine the sensitivity of the outcome to these changes. The influence of implementing the conservation compliance plan (CCP) is also examined. The time frame of the analysis is determined by the financially optimal. single rotation length of the tree stand. The real discounted revenues of the land use alternatives, based in 1993, are compared on a per-acre basis. The results indicate that retaining trees on post-CRP land is a better option than reverting land to corn, cotton without a CCP, sorghum, or wheat under all scenarios. However, when compared with reverting land to cotton with a CCP, retaining trees does not seem to be a profitable land use alternative under several of the scenarios. Given that a large proportion of the land going into CRP in east Texas is wheat acres, it seems likely that majority of the CRP land in trees is going to be retained in trees upon expiration of contracts.

Arekere, Marigowda Dhananjaya

1996-01-01T23:59:59.000Z

227

Technologies Recently Available for Licensing - 1999  

DOE Green Energy (OSTI)

An NREL Technology Transfer fact sheet describing four technologies that are available for licensing: steel weld weakness detection, cadmium telluride solar cell enhancement, HOMER model for choosing optimal electrical systems for remote areas, and inner-flame matrix burner.

Brown, H.; Touryan, K.

1999-09-07T23:59:59.000Z

228

PCx END USER SOFTWARE LICENSE AGREEMENT  

PCx_lic.web.enduser. doc 7-19-06 1 PCx END USER SOFTWARE LICENSE AGREEMENT This Agreement, is made between the University of Chica go as operator of Argonne National ...

229

Argument licensing and agreement in Zulu  

E-Print Network (OSTI)

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

230

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

231

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

232

Alternative Fuels Data Center: Biodiesel Distributor License and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Distributor Distributor License and Recordkeeping Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on AddThis.com... More in this section...

233

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Water Contractor Licensing Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Arkansas Program Type Solar/Wind Contractor Licensing Arkansas offers several limited, specialty licenses for solar thermal installers under the general plumbing license. There are three specialty classifications available for solar thermal installers: a Restricted Solar Mechanic license, a Supervising Solar Mechanic license, and a Solar Mechanic Trainee classification. Installers with a Restricted Solar Mechanic license can install and maintain systems used to heat domestic hot water, but are not allowed to perform any other plumbing work. Individuals holding a Supervising Solar Mechanic license are able to supervise, install

234

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 4, 2011 January 4, 2011 CX-004858: Categorical Exclusion Determination Facility Conservation Improvement Program Loan CX(s) Applied: A9, A11, B5.1 Date: 01/04/2011 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 4, 2011 CX-004857: Categorical Exclusion Determination Building Operations Certification License CX(s) Applied: A9, A11, B5.1 Date: 01/04/2011 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 4, 2011 CX-004854: Categorical Exclusion Determination Missouri-City-St. Peters CX(s) Applied: A1, A9, B2.5, B5.1 Date: 01/04/2011 Location(s): St. Peters, Missouri Office(s): Energy Efficiency and Renewable Energy January 3, 2011 CX-005094: Categorical Exclusion Determination

235

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

236

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

237

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

238

Nuclear Power Plant License Renewal Environmental Life Cycle Management Plan Manual: License Renewal Environmental Compliance  

Science Conference Proceedings (OSTI)

This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant's day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement.

1995-06-01T23:59:59.000Z

239

Alternative Fuels Data Center: Natural Gas and Propane Retailer License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retailer License to someone by E-mail Retailer License to someone by E-mail Share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Facebook Tweet about Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Twitter Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Google Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Delicious Rank Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Digg Find More places to share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas and Propane Retailer License Compressed natural gas, liquefied natural gas, or liquefied petroleum gas

240

T-564: Vulnerabilities in Citrix Licensing administration components |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Vulnerabilities in Citrix Licensing administration 4: Vulnerabilities in Citrix Licensing administration components T-564: Vulnerabilities in Citrix Licensing administration components February 24, 2011 - 7:00am Addthis PROBLEM: Vulnerabilities in Citrix Licensing administration components. PLATFORM: Citrix Licensing Administration Console, formerly known as the License Management Console. ABSTRACT: The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console. reference LINKS: Citrix ID:CTX128167 SecurityTracker Alert ID:1025123 Citrix Support IMPACT ASSESSMENT: Medium Discussion: Citrix has been made aware of a number of vulnerabilities in a third-party component that is used by the Citrix Licensing administration console. These vulnerabilities could potentially allow an unauthorized user to gain

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

VERMONT YANKEE NUCLEAR POWER STATION- NRC LICENSE  

E-Print Network (OSTI)

your application for a renewed license of your Vermont Yankee Nuclear Power Station. The enclosed report documents the result of the inspection which was discussed with members of your staff on May 24, 2007, at a publicly observed exit meeting conducted at the Latchis Theater in Brattleboro, VY. The purpose of this inspection was to examine the plant activities and documents that supported the application for a renewed license of the Vermont Yankee Nuclear Power Station. The inspection reviewed the screening and scoping of non-safety related systems, structures, and components, as required in 10 CFR 54.4(a)(2), and determined whether the proposed aging management programs are capable of reasonably managing the effects of aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications. The inspection team concluded screening and scoping of nonsafety-related systems, structures, and components, were implemented as required in 10 CFR 54.4(a)(2), and the aging management portions of the license renewal activities were conducted as described in the License Renewal Application. The inspection results supported a conclusion that the

Mr. Theodore; A. Sullivan

2007-01-01T23:59:59.000Z

242

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

243

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

244

Department of Energy No. AL-2010-01 Acquisition Regulation Date 11/25/09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

k k Department of Energy No. AL-2010-01 Acquisition Regulation Date 11/25/09 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Senior Procurement Executives of DOE and NNSA Subject: Implementation of the General Provisions of the Energy and Water Development and Related Agencies Appropriations Act, 2010 References: Energy and Water Development and Title 111, sections 301, 305, and 501 Related Agencies Appropriations Act, 2010 When Is this Acquisition Letter (AL) Effective? The statutory provisions addressed in this AL are effective on the date of the enactment of the Energy and Water Development and Related Agencies Appropriations Act, 201 0, which is October 28,2009. When Does this AL Expire? This AL remains in effect until superseded or canceled.

245

Department of Energy No. AL-2006-04 Acquisition Regulation Date 12/14/05  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AL-2006-04 AL-2006-04 Acquisition Regulation Date 12/14/05 ACQUISITION LETTER 1 T h ~ s A c q u ~ s i t ~ o n Letter 1s issued under the author~ty of the DOE and NNSA Procurement Executives. Subject: Acquiring Information Technology-Requirement to Comply With Internet Protocol Version 6 (IPv6) Attachment: Model Contract Clause What is the Effective date of this Acquisition Letter (AL)? This AL is effective upon issuance. When does this AL Expire? 'his AL remains in effect until superseded or canceled. What are the Points of Contact? For procurement related questions, contact: Michael Righi of the Office of Procurement and Assistance Policy at (202) 287-1 337 or M~cliacI.R~~hi~i~,licl.doc q o ~ ; or Douglas Baptist of the Office of Management Systeins and Services at (202) 287-1658 or D

246

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

247

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

248

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

249

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

250

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

251

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

252

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

253

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

254

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

255

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

256

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

257

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

258

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

259

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

260

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

262

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

263

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

264

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

265

Alternative Fuels Data Center: License Exemptions for Biodiesel Production  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

License Exemptions for License Exemptions for Biodiesel Production for Personal Use to someone by E-mail Share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Facebook Tweet about Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Twitter Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Google Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Delicious Rank Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Digg Find More places to share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on AddThis.com...

266

Regression analysis of oncology drug licensing deal values  

E-Print Network (OSTI)

This work is an attempt to explain wide variations in drug licensing deal value by using regression modeling to describe and predict the relationship between oncology drug deal characteristics and their licensing deal ...

Hawkins, Paul Allen

2006-01-01T23:59:59.000Z

267

Multiple clues for license plate detection and recognition  

Science Conference Proceedings (OSTI)

This paper addresses a license plate detection and recognition (LPR) task on still images of trucks. The main contribution of our LPR system is the fusion of different segmentation algorithms used to improve the license plate detection. We also compare ...

Pablo Negri; Mariano Tepper; Daniel Acevedo; Julio Jacobo; Marta Mejail

2010-11-01T23:59:59.000Z

268

Hydrogen and Fuel Cell Technologies Available for Licensing ...  

... Energy Innovation Portal on Google; Bookmark Hydrogen and Fuel Cell Technologies Available for Licensing - Energy Innovation Portal on Delicious ...

269

SAS4A/SASSYS-1 Commercial Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that themedia has been properly installed by Licensee.

270

Y-12 cleaning technology licensed by Knoxville engineering firm...  

National Nuclear Security Administration (NNSA)

cleaning technology licensed by Knoxville engineering firm | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

271

NRC LICENSE RENEWAL SCOPING/SCREENING INSPECTION  

E-Print Network (OSTI)

Dear Mr. Nazar: On May 21, 2004, the NRC completed an inspection regarding the application for license renewal for the D. C Cook Nuclear Plant. The enclosed report documents the inspection results, which were discussed with members of your staff. The purpose of this inspection was an examination of activities that support the application for a renewed license for D. C. Cook. The inspection consisted of a selected examination of procedures and representative records, and interviews with personnel regarding the process of scoping and screening plant equipment to select equipment subject to an aging management review. The inspection concluded that the scoping and screening portion of license renewal activities was conducted as described in the License Renewal Application and that documentation supporting the application is in an auditable and retrievable form. With the exception of the items identified in this report, your scoping and screening process was successful in identifying those systems, structures, and components required to be considered for aging management. In accordance with 10 CFR 2.390 of the NRC’s "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC’s document system (ADAMS). ADAMS is accessible from the NRC Web site at

Cynthia D. Pederson; M. Finissi; Plant Manager; G. White; Michigan Public; Service Commission

2004-01-01T23:59:59.000Z

272

Oil and Water Dispersion Technology Licensing Opportunity  

E-Print Network (OSTI)

Oil and Water Dispersion Technology Licensing Opportunity Technology Brief Professor Richard can be achieved by the process of degassing. The removal of dissolved gas, for example in oil dispersions. While laboratory scale degassing is predominantly batch processed and time consuming, Professor

273

Managing license compliance in free and open source software development  

Science Conference Proceedings (OSTI)

License compliance in Free and Open Source Software development is a significant issue today and organizations using free and open source software are predominately focusing on this issue. The non-compliance to licenses in free and open source software ... Keywords: Compatibility analysis, Compliance management, Free and open source software, License compliance, Rights expression languages

G. R. Gangadharan; Vincenzo D'Andrea; Stefano Paoli; Michael Weiss

2012-04-01T23:59:59.000Z

274

Statement by Deputy Secretary of Energy Clay Sell on NRG's License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by Deputy Secretary of Energy Clay Sell on NRG's by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General Electric and Toshiba, this project will likely result in the first of many new reactors being constructed and operated in the U.S. This reactor would join an American nuclear industry that is safe, secure and has a strong record to prove it. We look forward to the continued cooperation with industrial partners and

275

Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1992-03-01T23:59:59.000Z

276

Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1995-04-01T23:59:59.000Z

277

Licensed operating reactors. Status summary report data as of December 31, 1993  

SciTech Connect

The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

Hartfield, R.A.

1994-03-01T23:59:59.000Z

278

Software License Agreement | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

License Agreement License Agreement Print page Print page Email page Email page U.S. Department of Energy Office of Scientific and Technical Information Energy Science and Technology Software Center As the Office of Scientific and Technical Information's (OSTI) Energy Science and Technology Software Center (ESTSC), we are authorized to license and distribute this software to you. Upon receipt of license fee and execution of this license, the herein identified computer software package (software and accompanying documentation) is licensed, on a non-exclusive basis, to the UNDERSIGNED for use ONLY at the site designated herein below, and is to be used in accordance with this license and with the special restrictions identified below or on the software package. DOE-funded modifications, enhancements, or conversions of this

279

MEMORANDUM TO: FILE I' DATE---- SITE  

Office of Legacy Management (LM)

Electtic Corp. applied for licenses to receive knd possess at its Blnirsville and Forest Hills, Pa., plants uranium metal and uranium dioxide enriched in urnniwn 235 for use...

280

Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues  

Science Conference Proceedings (OSTI)

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

1998-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

282

DOE NETL Intellectual Property Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

18.12 18.12 DOE NETL Intellectual Property Available for Licensing Complete marketing summaries of the following technologies will be posted on the NETL Available Technologies page shortly. For additional information or to submit a license application, please contact techtransfer@netl.doe.gov. Technology Title and Brief Description Intellectual Property Status Metal oxide promoters for improving the reactivity and capacity of oxygen carriers for the chemical looping combustion process This invention provides an oxygen carrier comprised of a plurality of metal oxide particles in contact with a plurality of MgO promoter particles. The MgO promoter particles increase the reaction rate and oxygen utilization of the metal oxide when contacting with a gaseous hydrocarbon at a temperature greater than

283

NRC antitrust licensing actions, 1978--1996  

Science Conference Proceedings (OSTI)

NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

Mayer, S.J.; Simpson, J.J.

1997-09-01T23:59:59.000Z

284

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

285

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Available for Licensing Available for Licensing As new inventions are disclosed from BESC researchers, we will post information about the inventions on this webpage. Use the search engine below to match your technology needs with BESC disclosures or view all technologies in a particular category by clicking on the category below. View all inventions Enter keywords in the box. Separate the words with a comma (,) for multiple keywords. GO Advanced Biofuels (1 Inventions) Bioconversion (2 Inventions) Biomass Grasses (7 Inventions) Trees (1 Inventions) Genetic Tools (9 Inventions) Biotechnology (9 Inventions) Imaging (2 Inventions) PreTreatment (2 Inventions) Adams, Michael A (2 Inventions) Albersheim, Ivana G. (1 Invention) Backe, Jason (1 Invention) Bar-Peled, Maor (1 Invention) Bhave, Ramesh R (2 Inventions)

286

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

287

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

288

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

289

The Atomic Safety and Licensing Board Panel  

SciTech Connect

Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

NONE

1998-03-01T23:59:59.000Z

290

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

Science Conference Proceedings (OSTI)

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

291

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

292

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

293

Patents Licensing and Patent Waivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patent Licensing The DOE Invention Licensing Program provides information on licensing of DOE-owned inventions. Patent Waivers Patent Rights - Waiver Clause: This clause makes modifications to the Patent Rights clause of 48 C.F.R. 52.227-12 and should replace that clause in the contract when an advance waiver is granted. Petition form for advance waiver (PDF) to contractor of Government's title to inventions that may be made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Petition form for waiver (PDF) to contractor of Government's title to an identified invention already made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Patent Waiver Decisions:

294

City of Dubuque - Solar Thermal Licensing Requirement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement < Back Eligibility Construction Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Iowa Program Type Solar/Wind Contractor Licensing Provider City of Dubuque The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The licensing requirement can be met one of two ways. An installer may be Solar Thermal Certified by the North American Board of Certified Energy Practitioners (NABCEP) or An installer may complete the Northeast Iowa Community College Solar Thermal Training Installers are also required to obtain a permit before altering or

295

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Madison - Contractor Licensing of Madison - Contractor Licensing City of Madison - Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Wisconsin Program Type Solar/Wind Contractor Licensing Provider City of Madison Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code is a requirement for a Class A-4 license for "a person desiring to enter into the business of installing, altering or repairing active solar heating equipment" as well as fee and examination details. As a result of a

296

Chapter 5, "License Renewal and Aging Management for Continued Service  

SciTech Connect

As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

Naus, Dan J [ORNL] [ORNL

2013-01-01T23:59:59.000Z

297

Calvert Cliffs License Renewal Aging Management Review Reports  

Science Conference Proceedings (OSTI)

This report and associated CD-ROM documents the Calvert Cliffs License Renewal Aging Management Review Reports as of December 1998. The option to operate a nuclear power plant beyond its initial license term of 40 years is an important factor in financial decisions and long-term planning for utility asset management and capital improvement. This report provides other utilities with details of the technical evaluations to support their own preparation of a License Renewal Application (LRA).

1999-06-23T23:59:59.000Z

298

Vorbeck Materials Licenses Graphene-based Battery Technologies ...  

Vorbeck Materials Licenses Graphene-based Battery Technologies Vorbeck Materials Corp of Jessup, MD participated in the America’s Next Top Energy Innovator program ...

299

LED North America Receives Exclusive Patent License for ORNL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highlights Success Stories Contact Us Index Home | ORNL | Success Stories SHARE LED North America Receives Exclusive Patent License for ORNL Technology June 19, 2013 Views...

300

LALP-05-111 Licensable Novel Zeolite Synthesis Technologies Method ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary Zeolites and molecular

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Non-exclusive patent license agreement between Alliance and ...  

DRAFT – FOR DISCUSSION PURPOSES ONLY Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And

302

Glass Furnace Model (GFM) Six-Month Trial License  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

303

City of Madison - Contractor Licensing (Wisconsin) | Open Energy...  

Open Energy Info (EERE)

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

304

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

305

Sandia National Laboratories : Licensing/Technology Transfer News  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; News. IP Home; Search/Browse Technology Portfolios; Licensing Overview ...

306

Get listed in the Directory of Licensed Professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

or Province(s) in which you are a licensed Professional Engineer or Registered Architect Whether you hold a Green Building Engineer certification from the Association of...

307

NETL: News Release - DOE Licenses Mercury Control Patent to Help...  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2007 DOE Licenses Mercury Control Patent to Help Meet Clean Air Regulations Research Aims at Trace Element Reduction from Power Generation Facilities by 2010 Washington, DC - A...

308

MC2, Version 3.0, Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

309

NETL: News Release - Licensing Agreement Moves Two NETL-Patented...  

NLE Websites -- All DOE Office Websites (Extended Search)

March 23, 2011 Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Washington, D.C. - Two new patented sorbents used for carbon dioxide...

310

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

NLE Websites -- All DOE Office Websites (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

311

NOTICE OF INTENT TO GRANT PARTIALLY EXCLUSIVE LICENSE NATIONAL ...  

Gasification Combined Cycle (IGCC) Operator Training System (OTS) Software. The software license will include source and executable copies of the IGCC Dynamic Model ...

312

U.S. Department of Energy Technologies Available for Licensing ...  

U.S. Department of Energy Technologies Available for Licensing Our Mission. The mission of the Energy Department is to ensure America’s security and prosperity by ...

313

NRC Licensing Strategy Development for the NGNP  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

Mark R. Holbrook; Trevor Cook

2008-09-01T23:59:59.000Z

314

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

315

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

316

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

317

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

318

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

319

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

320

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

322

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

323

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

324

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

325

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

326

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

327

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

328

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

329

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

330

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

331

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

332

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

333

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

334

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

335

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

336

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

337

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

338

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

339

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

340

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

342

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

343

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

344

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

345

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

346

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

347

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

348

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

349

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

350

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

351

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

352

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

353

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

354

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

355

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

356

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

357

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

358

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

359

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

360

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

362

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

363

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

364

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

365

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

366

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

367

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

368

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

369

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

370

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

371

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

372

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

373

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Wind Program Info State Connecticut Program Type Solar/Wind Contractor Licensing Provider Connecticut Department of Consumer Protection The Connecticut Department of Consumer Protection (DCP) is authorized to issue licenses for solar-thermal work, solar-electric work and wind-electric work. "Solar thermal work" is defined as "the installation, erection, repair, replacement, alteration, or maintenance of active, passive and hybrid solar systems that directly convert ambient energy into heat or convey, store or distribute such ambient energy." Solar electricity

374

Los Alamos National Laboratory announces Express Licensing program  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL announces Express Licensing program LANL announces Express Licensing program Los Alamos National Laboratory announces Express Licensing program With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory has gotten easier. August 1, 2013 The following sequence shows the formation of nanoFOAM technology developed at Los Alamos National Laboratory. NanoFOAMs are self-supporting nanoporous metal foams that have potential applications in oil-refining processes, filtration of liquid or airborne germs, rocket fuels or catalytic production of a range of products from ammonia to plastics. NanoFOAM is just one of many licensable technologies available at Los Alamos National Laboratory. The following sequence shows the formation of nanoFOAM technology developed

375

Successful Clean Coal Technology Licensed for Commercial Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Clean Coal Technology Licensed for Commercial Successful Clean Coal Technology Licensed for Commercial Application Successful Clean Coal Technology Licensed for Commercial Application July 26, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH™) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

376

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Maine Program Type Solar/Wind Contractor Licensing In order to be eligible for Maine's solar thermal rebate program, systems must be installed by licensed plumbers who have received additional certification for solar thermal systems from the North American Board of Certified Energy Practitioners (NABCEP). The state solar thermal rebate program maintains a list of Efficiency Maine registered vendors/installers. In addition, Efficiency Maine has information for vendors interested in becoming registered and listed on the [http://www.efficiencymaine.com/at-home/registered-vendor-locator web

377

Non-Power Reactor Operator Licensing Examiner Standards. Revision 1  

SciTech Connect

The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

NONE

1995-06-01T23:59:59.000Z

378

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

379

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

380

Patent Protection and Licensing Procedure | BNL Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL Inventors BNL Inventors Patent Protection and Licensing Procedure TCP Staff Assignment - Invention Disclosures received by Intellectual Property Legal Group (IPLG) will be given a BNL number, and assigned to a specific TCP staff member for commercial assessment. Henceforth, the assigned staff member will be responsible for all commercialization actions relating to the docket. Assessment - The TCP staff member assigned to the docket will meet with the inventor(s). Together they will discuss the invention and make a preliminary evaluation of potential applications and possible markets. Based on commercial assessment and a preliminary novelty determination, the TCP staff will make a recommendation to the IPLG whether to patent the invention. The TCP's decision and relevant documents will be circulated

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Clean Fractionation: Technology Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Fractionation Clean Fractionation National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Offi ce of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL/FS-7A1-43959 * October 2008 Printed with a renewable-source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. You'll find more technologies available for licensing on the NREL Technology Transfer Web site at www.nrel.gov/technologytransfer/. National Renewable Energy Laboratory Innovation for Our Energy Future Biorefinery production costs are driven Insolubles Wash Cellulose pulp Lignocellulosic feedstock Solubles

382

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

383

TEAM 1 Drivers License.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

I I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure  Understand potential X-ray hazards of the modified instrument and shielding  Read and understand the Low Dose Machine Authorization document  Recognize high voltage hazards with the TEAM stage  Demonstrate handling of column valves  Point out where emergency contact numbers are posted

384

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

385

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

386

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

387

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The system’s

Carlos A. González Lozano; Miguel Vélez Reyes, Ph.D.; Gerson Beauchamp Báez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

388

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

389

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

390

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

391

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

392

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

393

State of California BOARD OF EQUALIZATION CIGARETTE AND TOBACCO PRODUCTS LICENSING ACT REGULATIONS  

E-Print Network (OSTI)

A new license shall not be issued to an applicant when any of the following apply: (1) a license subject to civil or criminal citation has been issued for the same location; (2) a license for the same location is suspended; (3) a license for the same location has been revoked any time within the preceding five years; or (4) any person

Regulation Denial; Of License

2006-01-01T23:59:59.000Z

394

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

395

ECOdriving - Widespread Implementation for Learner Drivers and Licensed  

Open Energy Info (EERE)

ECOdriving - Widespread Implementation for Learner Drivers and Licensed ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Agency/Company /Organization: Austrian Energy Agency Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.ecodrive.org/ The ECOWILL project aims to reduce carbon emissions by up to 8 Mt until 2015 by boosting the application of eco-driving across Europe. The project will roll out training programs for licensed drivers in 13 European countries. ECOWILL also promotes the education of eco-driving for learner drivers. This website provides information about eco-driving, including country-specific activities.

396

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

397

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

398

DOE Signs Advanced Enrichment Technology License and Facility Lease |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Enrichment Technology License and Facility Lease Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas centrifuge enrichment plant (GCEP) facilities in Piketon, OH for their American Centrifuge Plant. The Department of Energy (DOE) also granted a non-exclusive patent license to USEC for use of DOE's centrifuge technology for uranium enrichment at the plant, which will initiate the first successful deployment of advanced domestic enrichment technology in the

399

ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE  

Office of Legacy Management (LM)

COMMISSION COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d) Previous License No. Pompton Plains, N. J. 4. ST,.TE THE AOORESS(ES) AT WHICH SOURCE MATERIAL WILL BE POSSESSED OR USED 868 Black Oak Ridge Road, Wayne, fi. J. a*ocY s up/'l File IF 5. BUSINESS OR OCCUPATION I 6. (a) IF APPLICANT IS AN INDIVIDUAL. STATE CITIZENSHIP

400

Argonne Software Licensing: SAS4A/SASSYS-1  

BatPro software licensing ... SAS4A/SASSYS-1. The SAS4A/SASSYS-1 safety analysis code system is a simulation tool to perform deterministic transient safety analysis ...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Licensing arrangements and the development of the solar energy industry  

SciTech Connect

The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

Green, M.

1979-06-01T23:59:59.000Z

402

DOCKET NO. 40-9027 LICENSE NO. LICENSEE: SUBJECT:  

E-Print Network (OSTI)

License SMC-1562, covering storage of radioactive materials at both its Revere and Reading sites in Pennsylvania. Former ore processing at the Revere facility generated waste slag contaminated with uranium and thorium. In 1988, Cabot began onsite decommissioning

unknown authors

2001-01-01T23:59:59.000Z

403

NATIONAL ENERGY TECHNOLOGY LABORATORY (NETL) LICENSE ON FEDERALLY ...  

The facts set forth in this request for license are within the knowledge of the requestor and are submitted with the intention that the Director of the NETL rely on ...

404

ORNL, Da Vinci Sign Licensing Agreement | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Da Vinci Sign Licensing Agreement April 12, 2012 Seated are (l to r) ORNL Partnerships Director Tom Ballard and Da Vinci CEO Kent Froelund. Standing are (l to r) Johney Green, ORNL...

405

Software Development and Licensing at the Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

explain software licensing and distribution options available for LBNL software and how Tech Transfer can help get the job done. If you are a software developer, or you supervise...

406

Y-12 cleaning technology licensed by local engineering firm ...  

NLE Websites -- All DOE Office Websites (Extended Search)

cleaning technology ... Y-12 cleaning technology licensed by local engineering firm Posted: October 31, 2012 - 10:00am MK Technologies CEO and founder Mike Carroll and director of...

407

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues  

E-Print Network (OSTI)

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues Subcommittee Meeting Oct. 28, 2002 Livermore, CA #12;Idaho National Engineering and Environmental Laboratory · Approach to Regulatory Approval · Nuclear Design Codes · Summary #12;Idaho National Engineering

408

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

409

Photovoltaics at DOE's National Renewable Energy Laboratory License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

410

Photovoltaics at DOE's National Renewable Energy Laboratory License  

NLE Websites -- All DOE Office Websites (Extended Search)

ROOF-TOP LICENSE AGREEMENT KEY TERMS ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

411

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

412

REVIEWS FOR IN SITU LEACH URANIUM EXTRACTION LICENSE APPLICATIONS  

E-Print Network (OSTI)

Review Plan (NUREG–1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, Part 40 (10 CFR Part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provided detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the National Environmental Policy Act (NEPA). The purpose of the Standard Review Plan (NUREG–1569) is to provide the NRC staff with guidance on performing reviews of information provided by the applicant, and to ensure a consistent quality and

In Situ; Leach Uranium; In Situ; Leach Uranium; J. Lusher

2003-01-01T23:59:59.000Z

413

Summary of Utility License Termination Documents and Lessons Learned: Summary of License Termination Plan Submittals by Three Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission's (NRC's) 1996 revised decommissioning regulations specify that the operator of a nuclear plant must submit a "License Termination Plan" (LTP) two years prior to termination of the plant license. The LTP explicitly defines the elements that the plant operator must address in the decommissioning plan. This report focuses on the approaches and experience gained by three of the leading plants in the preparation and submittal of their LTP submittals under the 1996 regul...

2002-10-28T23:59:59.000Z

414

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

415

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

416

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

417

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

418

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective  

SciTech Connect

Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to a longer than anticipated period to obtain NRC approval of the Maine Yankee License Termination Plan (LTP). By employing the lessons learned from its first LTP submittal, which was not accepted by the NRC staff, Trojan was able to obtain approval of its revised LTP promptly. While both licensees provided final status survey reports (FSSRs) for NRC approval, the Trojan approach to decommissioning and data management allowed NRC to efficiently review FSS records and supporting documentation. Therefore, NRC was able to review Trojan's FSSR more efficiently than Maine Yankee's FSSR. This paper describes the regulatory impacts of the two different approaches to the decommissioning, the development of licensee required plans, decommissioning operations and records, the differences in licensing processes, and the lessons learned for improving the processes. (authors)

Watson, B.A.; Buckley, J.T.; Craig, C.M. [U.S. Nuclear Regulatory Commission, Office of Nuclear Materials Safety and Safeguards, Decommissioning Directorate (T7E18), Washington, D.C. 20555 (United States)

2006-07-01T23:59:59.000Z

419

Department of Energy Files Motion to Withdraw Yucca Mountain License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Files Motion to Withdraw Yucca Mountain Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the Nation meets our long-term storage obligations for nuclear waste," said Department of Energy General Counsel Scott Blake Harris. "In light of the decision not to proceed with the Yucca Mountain nuclear waste repository, the President directed Secretary Chu to establish the Blue Ribbon Commission on America's

420

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NETL: News Release - Successful Clean Coal Technology Licensed for  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2010 6, 2010 Successful Clean Coal Technology Licensed for Commercial Application DOE Receives First Repayment for Liquid Phase Methanol Process Development Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH(tm)) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

422

Argonne licenses diamond semiconductor discoveries to AKHAN Technologies |  

NLE Websites -- All DOE Office Websites (Extended Search)

licenses diamond semiconductor discoveries to AKHAN Technologies licenses diamond semiconductor discoveries to AKHAN Technologies By Joseph Bernstein * By Jared Sagoff * March 4, 2013 Tweet EmailPrint LEMONT, Ill. - The U.S. Department of Energy's Argonne National Laboratory announced today that the laboratory has granted AKHAN Technologies exclusive diamond semiconductor application licensing rights to breakthrough low-temperature diamond deposition technology developed by Argonne's Center for Nanoscale Materials (CNM). The Argonne-developed technology allows for the deposition of nanocrystalline diamond on a variety of wafer substrate materials at temperatures as low as 400 degrees Celsius. The combination of the Argonne's low-temperature diamond technology with AKHAN's Miraj Diamond(tm) process represents the state of the art in diamond semiconductor

423

Electrical Energy Producer's License Tax (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Producer's License Tax (Montana) Energy Producer&#039;s License Tax (Montana) Electrical Energy Producer's License Tax (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue Each person or other organization engaged in the generation, manufacture, or production of electricity and electrical energy in the state of Montana,

424

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

425

ENERGY STAR Guide for Licensed Professionals | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Guide for Licensed Professionals Guide for Licensed Professionals Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

426

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

Not Available

1993-11-01T23:59:59.000Z

427

The use for frequency-consequence curves in future reactor licensing  

E-Print Network (OSTI)

The licensing of nuclear power plants has focused until now on Light Water Reactors and has not incorporated systematically insights and benefits from Probabilistic Risk Assessment (PRA). With the goal of making the licensing ...

Debesse, Laurène

2007-01-01T23:59:59.000Z

428

Licensing sentence-internal readings in english: an experimental study  

Science Conference Proceedings (OSTI)

Adjectives of comparison (AOCs) like same, different and similar can compare two elements sentence-internally, i.e., without referring to any previously introduced element. This reading is licensed only if a semantically plural NP ... Keywords: Bayesian statistics, acceptability judgments, adjectives of comparison, distributivity, pluralities

Adrian Brasoveanu; Jakub Dotla?il

2011-12-01T23:59:59.000Z

429

Revised Industry Steam Generator Program Generic License Change Package  

E-Print Network (OSTI)

License Change Package for NRC review and endorsement. Industry events during the subsequent months have delayed the NRC review and presented an opportunity for the industry to improve the submittal. A summary of the major changes from the February submittal is provided in Enclosure 1. The resulting package (Enclosures 2 through 8), which supercedes the earlier version in its entirety, is enclosed for your endorsement. Although the events of the last ten months have resulted in some changes to the industry steam generator program guidance, the fundamental principles remain sound. Equally as important, the program has demonstrated its resiliency. The steam generator program guidance is designed to accommodate new knowledge and experience, and that is precisely what is occurring. The enclosed Generic License Change Package includes changes that reflect recent experience. In addition, the appropriate underlying technical documents are currently being revised or supplemental guidance is being developed as necessary to reflect new information. The industry and the NRC worked diligently to address the technical and licensing issues that ultimately resulted in the February 2000 version of the Steam Generator Program Generic License Change Package. Although these documents have been revised since the previous submittal, the differences do not represent a change in our position on the issues.

David J. Modeen; Mr. Samuel; J. Collins; U. S. Nuclear; Regulatory Commission; Xuo Mr; Samuel J. Collins

2000-01-01T23:59:59.000Z

430

Office of Information Technology University of Minnesota 1 Software Licenses  

E-Print Network (OSTI)

, visit the Change Management website. Scheduled Maintenance The schedule of OIT maintenance windows is published on the System Status page. Should maintenance be required outside of the scheduled maintenanceSoftwareLicenseServer. If the maintenance window extends beyond anticipated end time, the System Status page will be updated accordingly

Amin, S. Massoud

431

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, ... Keywords: acoustic vehicle classification, license plate detection, seismic, wireless sensor networks

Jan Frigo; Vinod Kulathumani; Sean Brennan; Ed Rosten; Eric Raby

2009-06-01T23:59:59.000Z

432

Radiation Protection and Licensing FNAL Radiation Physics Team  

E-Print Network (OSTI)

/replace philosophy 8. Remote Handling capabilities 9. Alignment and Stability 10. Radioactive off-gas (especially shielded repair cells · Need remote handling capability · Problems during lifting and moving are difficult. January 13, 2012 Radiation Protection and Licensing #12;11 Repair Cell and Remote Handling capabilities

McDonald, Kirk

433

Interim On-Site Storage of Low Level Waste: Volume 1: Licensing and Regulatory Issues  

Science Conference Proceedings (OSTI)

This report is an all-inclusive resource guide for evaluating a utility's on-site storage licensing requirements. Specifically, the report offers an extensive review of licensing and regulatory documents related to on-site storage of low level waste as well as a methodology for evaluating on-site storage licensing issues.

1992-06-01T23:59:59.000Z

434

Objectives, characteristics and outcomes of university licensing: A survey of major U.S. universities  

E-Print Network (OSTI)

Abstract This paper describes results of our survey of licensing at 62 research universities. We consider ownership, income splits, stage of development, marketing, license policies and characteristics, goals of licensing and the role of the inventor in licensing. Based on these results we analyze the relationship between licensing outcomes and both the objectives of the TTO and the characteristics of the technologies. Patent applications grow one-to-one with disclosures, while sponsored research grows similarly with licenses executed. Royalties are typically larger the higher the quality of the faculty and the higher the fraction of licenses that are executed at latter stages of development. Sponsored research is more likely to be included in a license if the new technology is at an early stage of development or if the TTO evaluates it as important. We find that additional disclosures generate smaller percentage increases in licenses, and those increases in licenses generate smaller percentage increases in royalties. University licensing has increased dramatically since the passage of the Bayh-Dole Act in 1980, which gave universities the right to retain title to and license inventions resulting from federallysponsored

Jerry G. Thursby; Richard Jensen; Marie C. Thursby

2001-01-01T23:59:59.000Z

435

Real-time automatic license plate recognition for CCTV forensic applications  

Science Conference Proceedings (OSTI)

We propose an efficient real-time automatic license plate recognition (ALPR) framework, particularly designed to work on CCTV video footage obtained from cameras that are not dedicated to the use in ALPR. At present, in license plate detection, tracking ... Keywords: CCTV video footage, License plate recognition, Surveillance, Traffic monitoring, Video indexing

M. S. Sarfraz, A. Shahzad, Muhammad A. Elahi, M. Fraz, I. Zafar, E. A. Edirisinghe

2013-09-01T23:59:59.000Z

436

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

437

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

438

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z

439

Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL  

E-Print Network (OSTI)

Feb 2003 Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL 1) Source: Bldg: ________________________________________ Disinfection? cc YES, Autoclaved (each container tagged with `Treated Biomedical Waste') cc YES, Chemical

Sinnamon, Gordon J.

440

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Portland) CX(s) Applied: A9 Date: 03012010 Location(s):...

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Los Angeles) CX(s) Applied: A9 Date: 03012010 Location(s):...

442

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 CX-006930: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09282011 Location(s): Torrance, Los Angeles...

443

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

1996-02-01T23:59:59.000Z

444

Using neighbors to date web documents  

Science Conference Proceedings (OSTI)

Time has been successfully used as a feature in web information retrieval tasks. In this context, estimating a document's inception date or last update date is a necessary task. Classic approaches have used HTTP header fields to estimate a document's ... Keywords: link analysis, web dynamics, web information retrieval

Sérgio Nunes; Cristina Ribeiro; Gabriel David

2007-11-01T23:59:59.000Z

445

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

446

GRR/Section 3-MT-d - Land Use License Process | Open Energy Information  

Open Energy Info (EERE)

d - Land Use License Process d - Land Use License Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-d - Land Use License Process 03MTDLandUseLicenseProcess (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Regulations & Policies Surface Management Rule 36.25.103 Triggers None specified Click "Edit With Form" above to add content 03MTDLandUseLicenseProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The land use license is intended to be used for short-term use of state-owned lands. This license may be used for casual use of the lands

447

Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed  

NLE Websites -- All DOE Office Websites (Extended Search)

4: June 8, 2009 4: June 8, 2009 Vehicles per Licensed Driver Rising to someone by E-mail Share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Facebook Tweet about Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Twitter Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Google Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Delicious Rank Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Digg Find More places to share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on AddThis.com... Fact #574: June 8, 2009

448

Regulators Experiences in Licensing and Inspection of Dry Cask Storage Facilities  

SciTech Connect

The United States Nuclear Regulatory Commission (NRC), through the combination of a rigorous licensing and inspection program, ensures the safety and security of dry cask storage. NRC authorizes the storage of spent fuel at an independent spent fuel storage installation (ISFSI) under two licensing options: site-specific licensing and general licensing. In July 1986, the NRC issued the first site-specific license to the Surry Nuclear Power Plant in Virginia authorizing the interim storage of spent fuel in a dry storage cask configuration. Today, there are over 30 ISFSIs currently licensed by the NRC with over 700 loaded dry casks. Current projections identify over 50 ISFSIs by the year 2010. No releases of spent fuel dry storage cask contents or other significant safety problems from the storage systems in use today have been reported. This paper discusses the NRC licensing and inspection experiences. (authors)

Baggett, S.; Brach, E.W. [Spent Fuel Project Office, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

449

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD EL QOTBI Tuna EL QOTBI Noemie FATMI Karine CLAIR Florian KNISCH Guillaume NAHON Charlotte SEHMOUNE Nabil AD : A

Douai, Antoine

450

Investing in the Energy Future: An Industry Guide to Licensing Technologies at the National Renewable Energy Laboratory (NREL) (Brochure)  

Science Conference Proceedings (OSTI)

Provides an overview of NREL's licensing opportunities and processes, and commercialization programs.

Not Available

2010-09-01T23:59:59.000Z

451

Key Issues for the Safety and Licensing of Fusion  

SciTech Connect

Studies of the safety and environmental impacts of fusion, both of future power plants and of ITER, have shown that a good performance can be achieved. Although it is difficult to anticipate the regulatory regime in which future fusion power stations will be licensed, the areas of public and occupational safety and short and long-term environmental impact are likely to remain important. In each of these areas, the outcome of various studies have been reviewed, leading to a list of issues which should be given attention to facilitate eventual licensing of a fusion power plant. Many of these relate to reducing conservatisms and uncertainties in the analyses, but also included are improved understanding of tritium retention and of dust generation, and development of materials to provide long component lifetimes. A full appraisal is also recommended of the viability of recycling of active materials after end of plant life.

Taylor, Neill P. [Culham Science Centre (United Kingdom)

2005-05-15T23:59:59.000Z

452

Completion of decommissioning: Monitoring for site release and license termination  

SciTech Connect

To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption.

Boing, L.E.

1997-08-01T23:59:59.000Z

453

Greece licensing round to focus on western sedimentary basins  

SciTech Connect

New opportunities for international oil companies to explore for hydrocarbons in Greece will emerge shortly. Parliament ratified a new petroleum law in January 1995, and DEP-EKY SA will undertake an international licensing round for offshore-onshore areas mainly in western Greece during second half 1995. The paper describes the fold and thrust belt of western Greece; the Katakolon oil field; the tertiary basins of eastern Greece; the Prinos and Prinos North oil fields; and the Epanomi gas field.

Roussos, N.; Marnelis, F. (Public Petroleum Corp. of Greece, Athens (Greece))

1995-03-06T23:59:59.000Z

454

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

Not Available

1991-04-01T23:59:59.000Z

455

Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License.  

E-Print Network (OSTI)

2/11/12 1 Lec 2M.1 Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License. Mathematics for Computer Science MIT 6.042J/18.062J The Well Ordering Principle, III Lec 2M.2 Albert R Meyer February 13, 2012 Geometric sums

456

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

457

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory November 23, 2009 CX-000206: Categorical Exclusion Determination Michigan Biogas Center of Excellence CX(s) Applied: A9, B3.6 Date: 11232009 Location(s): Flint,...

458

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery and Reinvestment Act State Energy Program - Estacada School District Biomass Boilers CX(s) Applied: B5.1 Date: 08032010 Location(s): Estacada, Oregon Office(s): Energy...

459

Property:PublicationDate | Open Energy Information  

Open Energy Info (EERE)

"PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2.8-Ma Ash-Flow Caldera At Chegem River In The Northern Caucasus Mountains (Russia),...

460

102nd Annual Meeting Dates to Remember  

Science Conference Proceedings (OSTI)

Dates to Remember November 1, 2010 Online registration opens January 7, 2011 Exhibitor Presentations: Deadline for abstracts to be printed in the abstract book January 31, 2011 Last day for early booth rental fees January 31, 2011 Booths cance

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Water Based, Critical Flow, Non-Vapor-Compression Cooling Cycle CX(s) Applied: B3.6 Date: 04302012 Location(s): Kansas...

462

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 CX-009271: Categorical Exclusion Determination National Governors Association Energy Project - Phase II CX(s) Applied: A9, A11 Date: 09102012 Location(s): CX: none...

463

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B1.23 Date: 09242012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory September 24, 2012 CX-009336: Categorical Exclusion...

464

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09302010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National...

465

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

466

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B3.6 Date: 03172010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory March 17, 2010 CX-001327: Categorical...

467

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 CX-008228: Categorical Exclusion Determination Hydropower Energy Resource (HyPER) Harvester CX(s) Applied: A9 Date: 04112012 Location(s): New Mexico Offices(s): Golden...

468

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Golden Field Office November 24, 2010 CX-004532: Categorical Exclusion Determination Tidal Energy System for On-Shore Power Generation CX(s) Applied: A9, B3.6 Date: 11242010...

469

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Low-Cost Integrated Substrate for Organic Light-Emitting Diode (OLED) Lighting (Ewing) CX(s) Applied: B3.6 Date: 03192010 Location(s):...

470

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Reactor Technology for Hydro processing Bio-oils to Produce Gasoline, Diesel and Jet Fuel CX(s) Applied: A9, B3.6 Date: 05022011 Location(s): Maryland Office(s): Energy...

471

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program- ARRA Revolving Loan Fund- Ivan Smith Furniture- Compressed Natural Gas Vehicle Fueling Stations CX(s) Applied: B5.1, B5.22 Date: 02112013 Location(s):...

472

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar - Roof Mounted - Ebay CX(s) Applied: B5.1 Date: 02082011 Location(s): South Jordan, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February...

473

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Laboratory April 11, 2011 CX-005602: Categorical Exclusion Determination Jet Drilling With Energized Fluids CX(s) Applied: B3.6, B3.7 Date: 04112011 Location(s):...

474

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation  

Science Conference Proceedings (OSTI)

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This manual covers an array of modules written for the SCALE package, consisting of drivers, system libraries, cross section and materials properties libraries, input/output routines, storage modules, and help files.

NONE

1997-03-01T23:59:59.000Z

475

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

476

GRR/Section 12-HI-a - Habitat Conservation Plan and Incidental Take License  

Open Energy Info (EERE)

2-HI-a - Habitat Conservation Plan and Incidental Take License 2-HI-a - Habitat Conservation Plan and Incidental Take License < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-HI-a - Habitat Conservation Plan and Incidental Take License 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Division of Forestry and Wildlife Regulations & Policies Hawaii Revised Statutes 195D-21 Triggers None specified Click "Edit With Form" above to add content 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

477

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

478

U-047: Siemens Automation License Manager Bugs Let Remote Users Deny  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Siemens Automation License Manager Bugs Let Remote Users 7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code November 29, 2011 - 9:00am Addthis PROBLEM: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code. PLATFORM: Siemens Automation License Manager 500.0.122.1 ABSTRACT: Several vulnerabilities were reported in Siemens Automation License Manager. reference LINKS: SecurityTracker Alert ID: 1026354 Bugtraq Siemens Advisory Services IMPACT ASSESSMENT: Medium Discussion: A remote user can execute arbitrary code on the target system. A remote user can cause denial of service conditions. A remote user can send specially crafted *_licensekey commands to trigger a

479

Nondestructive Evaluation: Plant Aging/License Renewal Nondestructive Examination Gap Solutions and Strategies, Vol. 1  

Science Conference Proceedings (OSTI)

This report provides strategic direction to the development of nondestructive evaluation (NDE) technology and programs for the management of aging nuclear power plants and plant license renewal. Section 2 provides project proposal descriptions developed by staff of the Electric Power Research Institute (EPRI) to address issues identified by the Aging Plant NDE Working Group. Section 3 is a summary of support provided to the License Renewal Integration Working Group on NDE related to license renewal. Sect...

2008-12-22T23:59:59.000Z

480

The debate over re-licensing the Vermont Yankee nuclear power plant  

Science Conference Proceedings (OSTI)

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote? (author)

Watts, Richard; Hines, Paul; Dowds, Jonathan

2010-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "date license expiration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Proceedings: 2004 EPRI Topical Workshop - License Termination Plans/Final Site Release  

Science Conference Proceedings (OSTI)

One of the final challenges in plant decommissioning is that of license termination and final site release. The EPRI Decommissioning - License Termination and Final Site Release Workshop was the tenth in a series designed to aid utility personnel in decommissioning nuclear power plants. This workshop focused on specific aspects of license termination activities and final site release as they relate to decommissioning. The information presented will update utilities on developments and experience related ...

2005-09-16T23:59:59.000Z

482

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

483

Management of the Licensed Bases of Advanced Nuclear Plants: Proof of Approach  

Science Conference Proceedings (OSTI)

Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its lifecycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This project adopted and demonstrated a "twin-engine" approach that integrates a program from the emerging class of concept searching tools with a mod...

2000-08-28T23:59:59.000Z

484

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

485

TransForum v8n2 - DeNOX Catalyst License  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Fuel Technologies Gets Worldwide License for Argonne-developed Diesel DeNOX Catalyst Argonne chemist Chris Marshall (front) displays a container of the catalyst while...

486

LA-UR-08-0123a Licensable Explosives Ordnance Disposal Using ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary:

487

LALP-08-045 Licensable Lead-Free Super-Thermite Electric Matches  

Licensable Technologies Lead-Free Super-Thermite Electric Matches An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA

488

SAS4A/SASSYS-1 Educational/Nonprofit Software License Agreement  

1 SAS4A/SASSYS-1 EDUCATIONAL/NON-PROFIT SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne, LLC asoperator of Argonne ...

489

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1  

Science Conference Proceedings (OSTI)

NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

490

Regulatory Reform and License Termination Planning in Decommissioning  

SciTech Connect

Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning.

Michael J. Meisner

2000-06-04T23:59:59.000Z

491

Safety and licensing for small and medium power reactors  

SciTech Connect

Proposed new concepts for small and medium power reactors differ substantially from traditional Light Water Reactors (LWRs). Although designers have a large base of experience in safety and licensing, much of it is not relevant to new concepts. It can be a disadvantage if regulators apply LWR rules directly. A fresh start is appropriate. The extensive interactions between industry, regulators, and the public complicates but may enhance safety. It is basic to recognize the features that distinguish nuclear energy safety from that for other industries. These features include: nuclear reactivity, fission product radiation, and radioactive decay heat. Small and medium power reactors offer potential advantages over LWRs, particularly for reactivity and decay heat.

Trauger, D.B.

1987-01-01T23:59:59.000Z

492

NRC Consent to Indirect License Transfer/Threshold Determination- Merger  

E-Print Network (OSTI)

Company ("CY"), and Yankee Atomic Electric Company ("YR") (each a "Yankee Company," and together, "the Yankee Companies"), hereby respond to the Nuclear Regulatory Commission ("NRC") Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC Nos. L24496, L24497, and L24498) ("RAI 3") received by the Yankee Companies on August 5, 2011. If you have questions or require additional information, please contact me or Joe Fay at (207) 350-0300. Sincerely, Wayne Norton

The Yankee Companies

2011-01-01T23:59:59.000Z

493

Security & Defense Licenses Available | Tech Transfer | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Available Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies | Security and Defense SHARE Security and Defense 200401423 Synthesis Method for Stable Colloids of "Naked" Metal Nanocrystals 200501549 Enhanced Detection of Toxic Agents 200501614 Robust Low-Frequency Spread-Spectrum Navigation System (Related ID # 200601627) 200501640 Secure Identification of Textiles and Other Consumer Products 200701980 Cyberspace Security Econometrics System 200701995 An Intrusion Detection System Using Quantum-mechanical

494

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

495

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

496

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

497

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

498

Gas reactor international cooperative program interim report: United States/Federal Republic of Germany nuclear licensing comparison  

SciTech Connect

In order to compare US and FRG Nuclear Licensing, a summary description of United States Nuclear Licensing is provided as a basis. This is followed by detailed information on the participants in the Nuclear Licensing process in the Federal Republic of Germany (FRG). FRG licensing procedures are described and the rules and regulations imposed are summarized. The status of gas reactor licensing in both the U.S. and the FRG is outlined and overall conclusions are drawn as to the major licensing differences. An appendix describes the most important technical differences between US and FRG criteria.

1978-09-01T23:59:59.000Z

499

Sodium fast reactor safety and licensing research plan. Volume I.  

SciTech Connect

This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

Sofu, Tanju (Argonne National Laboratory, Argonne, IL); LaChance, Jeffrey L.; Bari, R. (Brokhaven National Laboratory Upton, NY); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.; Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN)

2012-05-01T23:59:59.000Z

500

Non-Unit Faculty Effective Date  

E-Print Network (OSTI)

SUBJECT: Non-Unit Faculty Evaluation Effective Date: 05-18-11 Policy Number: 4-500.1 Supersedes: 4 Adoption: 03-30-05 APPLICABILITY/ACCOUNTABILITY: This policy is applicable to all units and departments that employ non-unit faculty employees in regular positions. POLICY STATEMENT: Non-unit faculty members

Glebov, Leon